HUDA GURGAON
RECYCLE
MS Pipe Supply
40%
Total Installation Total
344,821,370 23,834,267 368,655,637
419,217,056 23,234,211 442,451,267
48,859,266 4,604,990 53,464,256
- 109,013,710 109,013,710
812,897,692 160,687,178 973,584,870
DA GURGAON
CYCLE
pply
Tender Inviting Authority: Executive Engineer, HUDA, Division NO. III, Gurgaon. Less (-)
Name of Work: Providing master water supply scheme for new sector 58 - 115 (distribution mains) for (Zone-IV to VIII), Gurgaon. "Providing, stringing out, jointing, Excess ( + )
cutting
ContractandNo:testing of DI pipes (K9) of 200mm to 1200mm i/d sizes and 1200mm MS pipe, providing and fixing of sluice valves, zero velocity valve, scour valve, double
Civil Works 1
Bidder Name: Excess ( + ) %
SCHEDULE OF WORKS
Sl. (This BOQ template Description
must not beofmodified/replaced
work by the bidder and the
No. orsame should be uploaded
Unit after(DPR)
Estimated filling the relevent columns,
AMOUNT JWIL Rate TOTAL ED CST PF Total Installation
No. Qty. Rate AS PER DPR SUPPLY
Rs. P
Figure Figure 0.00% 2% 5% 0.00% 10.00%
1.00 1/6.8(a) 524676.00 Per % Cum 1030.00 25399565.00 0.00 0.00 0.00 0.00 80.00
Excavation for pipelines running under pressure in trenches and
pits. In open areas, where deposal of surplus earth is done along
with the alignment and restoration on unmetallied or unpaved
surface to its original condition, ordinary soil.
(a) Without timbering and shoring upto 1.50Mtr depth
2.00 (b) With timbering and shoring 171682.00 Per % Cum 1472.00 11877647.00 0.00 0.00 0.00 0.00 100.00
(ii) Exceeding 1.5m depth but upto 2.25 M depth.
3.00 (iii)Exceeding 2.25m depth but upto 3.00 M depth. 89463.00 Per % Cum 1597.00 6715003.00 0.00 0.00 0.00 0.00 120.00
M.S. pipes and specials, S/V, A/V & Z/ V valves shall be inspected
by Executive Engineer(or) his authorized representative at
manufacturer's permises before dispatch.
4.00 2/Appd Item 300.00 Per Mtr. 75690.00 22707000.00 34185.79 10,255,736.48 0.00 2,05,114.73 10,46,085.12 1,15,06,936.33 37,333.33
Providing spirally welded M.S pipe to be procured from Jindal /
TATA / Welspun (PSL (P) Ltd. and maan industries) made up of
M.S plate of as per IS 2062,IS:3589-2001 internal lining with
25mm thick cement mortar 1:3 and external 3LPE coating as per
relevant specification and IS code including welding and Laying
the pipe through trenchless technology by pipe jacking to cross
the carriage way including maintain levels with the help of laser
guided equipment, excavation of thrush and receiving pit, side
soring, filling back, compaction, disposal of surplus earth
including generator, JCB, cranes, pipe jacking machine etc. all
material and labours as per requirement, direction of Engineer-
in-Charge and complete in all respect including the cost of
Ground Penetration Radar Survey including cost of stringing
pipes jointing and cutting completion all respect.
i) 1600mm i/d M.S. Pipe (min. thickness 15mm)
5.00 (ii)1500mm i/d M.S. Pipe (min. thickness 15mm) 150.00 Per Mtr. 70460.00 10569000.00 32061.05 4809157.59 0.00 96,183.15 4,90,534.07 53,95,874.82 42,000.00
6.00 (iii)1400mm i/d M.S. Pipe (min. thickness 14mm) 150.00 Per Mtr. 63260.00 9489000.00 28431.60 4264740.25 0.00 85,294.81 2,17,501.75 45,67,536.81 46,666.67
7.00 3/Appd Item 4010.00 Per Mtr. 51685.00 207256850.00 34185.79 137085010.98 0.00 27,41,700.22 69,91,335.56 14,68,18,046.76 2,240.00
Providing spirally welded M.S pipe to be procured from
manufactures Jindal / TATA / Welspun / PSL (P) Ltd and main
industries made up of M.S plate as per IS 2062,IS:3589-2001
including cost of internal lining with 25mm thick cement mortar
1:3 and external 3LPE coating as per relevant specification and IS
code including welding and Laying the pipe, testing, cutting +
jointing all material and labours as per requirement, direction of
Engineer-in-Chage and complete in all respect.
(i)1600mm i/d M.S. Pipe (min. thickness 15mm)
8.00 (ii)1500mm i/d M.S. Pipe (min. thickness 15mm) 6350.00 Per Mtr. 48455.00 307689250.00 32061.05 203587671.46 0.00 40,71,753.43 1,03,82,971.24 21,80,42,396.13 2,100.00
9.00 (iii)1400mm i/d M.S. Pipe (min. thickness 14mm) 1080.00 Per Mtr. 42256.00 45636480.00 28431.60 30706129.83 0.00 6,14,122.60 15,66,012.62 3,28,86,265.05 1,960.00
10.00 4a/Appd Item 300.00 Per Mtr. 30310.00 9093000.00 21240.00 6372000.00 0.00 63,72,000.00 1,274.40
Providing,laying,unloading and stringing out of K9 DI Pipes as per
IS:8329/2000(inside centrifugally cement Mortar Line) (outer
surface painted with red appoxy colour paint with Gum Spray to
be precured from reputed manufacturer Jindal Saw, TATA
Metallic, Electrosteel casting, Electrotherm and Lanco industries
of various sizes excluding excavation, jointing and cutting
complete in all respect as per direction of En-I-C.
(i)1200mm i/d D.I. pipe line laid complete
11.00 1100mm i/d DI pipe line laid complete 1750.00 Per Mtr. 22840.00 39970000.00 18537.00 32439750.00 0.00 3,24,39,750.00 1,112.22
12.00 1000mm i/d DI pipe line laid complete 600.00 Per Mtr. 18720.00 11232000.00 15075.00 9045000.00 0.00 90,45,000.00 904.50
13.00 900mm i/d DI pipe line laid complete 8525.00 Per Mtr. 15390.00 131199750.00 12565.00 107116625.00 0.00 10,71,16,625.00 753.90
14.00 800mm i/d DI pipe line laid complete 530.00 Per Mtr. 12720.00 6741600.00 10260.00 5437800.00 0.00 54,37,800.00 615.60
15.00 700mm i/d DI pipe line laid complete 6600.00 Per Mtr. 10320.00 68112000.00 8345.00 55077000.00 0.00 5,50,77,000.00 500.70
16.00 600mm i/d DI pipe line laid complete 12915.00 Per Mtr. 8050.00 103965750.00 6474.00 83611710.00 0.00 8,36,11,710.00 388.44
17.00 500mm i/d DI pipe line laid complete 3270.00 Per Mtr. 6160.00 20143200.00 5096.22 16664629.39 0.00 1,66,64,629.39 305.77
18.00 450mm i/d DI pipe line laid complete 770.00 Per Mtr. 5180.00 3988600.00 4250.00 3272500.00 0.00 32,72,500.00 255.00
19.00 400mm i/d DI pipe line laid complete 550.00 Per Mtr. 4360.00 2398000.00 3561.00 1958550.00 0.00 19,58,550.00 213.66
20.00 350mm i/d DI pipe line laid complete 3050.00 Per Mtr. 3630.00 11071500.00 2965.00 9043250.00 0.00 90,43,250.00 177.90
21.00 300mm i/d DI pipe line laid complete 4095.00 Per Mtr. 2910.00 11916450.00 2384.00 9762480.00 0.00 97,62,480.00 143.04
22.00 250mm i/d DI pipe line laid complete 550.00 Per Mtr. 2300.00 1265000.00 1877.00 1032350.00 0.00 10,32,350.00 112.62
23.00 200mm i/d DI pipe line laid complete 550.00 Per Mtr. 1700.00 935000.00 1402.00 771100.00 0.00 7,71,100.00 84.12
24.00 150mm i/d DI pipe line laid complete 550.00 Per Mtr. 1280.00 704000.00 1059.83 582908.25 0.00 5,82,908.25 63.59
25.00 4b/Appd Item 2340.00 Per Mtr. 797.00 1864980.00 0.00 - 0.00 0.00 0.00 0.00 1,274.40
Providing and stringing out of K9 DI Pipes
(i) 1200mm i/d D.I. pipe line laid complete (Labour rae
26.00 5/Appd Item 480.00 Each 470.00 225600.00 0.00 0.00 0.00 0.00 36.00
Jointing D.I. socketted pipes, valves & specials with rubber tyton
joints fitted complete including cost of labour & tools etc and
tested complete in all respect as per direction and satisfaction of
Engineer-in-Charge.
(i)1200mm i/d D.I. pipe line laid complete
27.00 (ii)1100mm i/d D.I. Pipe line laid complete 318.00 Each 375.60 119441.00 0.00 0.00 0.00 0.00 375.00
28.00 (iii)1000mm i/d D.I. Pipe line laid complete 109.00 Each 313.00 34117.00 0.00 0.00 0.00 0.00 313.00
29.00 (iv)900mm i/d D.I. Pipe line laid complete 1550.00 Each 187.80 291090.00 0.00 0.00 0.00 0.00 187.00
30.00 (v)800mm i/d D.I. Pipe line laid complete 96.00 Each 156.50 15024.00 0.00 0.00 0.00 0.00 156.00
31.00 (vi)700mm i/d D.I. Pipe line laid complete 1200.00 Each 134.15 160980.00 0.00 0.00 0.00 0.00 134.00
32.00 (vii) 600mm i/d D.I. Pipe line laid complete 2348.00 Each 104.35 245014.00 0.00 0.00 0.00 0.00 104.00
33.00 (viii)500mm i/d D.I. Pipe line laid complete 595.00 Each 85.40 50813.00 0.00 0.00 0.00 0.00 84.00
34.00 (ix)450mm i/d D.I. Pipe line laid complete 140.00 Each 72.25 10115.00 0.00 0.00 0.00 0.00 72.00
35.00 (x)400mm i/d D.I. Pipe line laid complete 100.00 Each 60.60 6060.00 0.00 0.00 0.00 0.00 60.00
36.00 (xi)350mm i/d D.I. Pipe line laid complete 555.00 Each 52.50 29138.00 0.00 0.00 0.00 0.00 52.00
37.00 (xii)300mm i/d D.I. Pipe line laid complete 745.00 Each 46.95 34978.00 0.00 0.00 0.00 0.00 47.00
38.00 (xiii)250mm i/d D.I. Pipe line laid complete 100.00 Each 39.15 3915.00 0.00 0.00 0.00 0.00 39.00
39.00 (xiv)200mm i/d D.I. Pipe line laid complete 100.00 Each 36.15 3615.00 0.00 0.00 0.00 0.00 36.00
40.00 (xv)150mm i/d D.I. Pipe line laid complete 100.00 Each 34.80 3480.00 0.00 0.00 0.00 0.00 35.00
41.00 6/Appd Item 24.00 Each 372.00 8928.00 0.00 0.00 0.00 0.00 372.00
Jointing D.I. socketted pipes, valves & specials with run lead
caulked joints excluding cost of lead & but including cost of yarn,
labour & tools etc and testing complete in all respect as per
direction and satisfaction of Engineer-in-Charge.
(i)1200mm i/d D.I. pipe line laid complete
42.00 (ii)1100mm i/d D.I. Pipe line laid complete 16.00 Each 340.00 5440.00 0.00 0.00 0.00 0.00 340.00
43.00 (iii)1000mm i/d D.I. Pipe line laid complete 5.00 Each 310.00 1550.00 0.00 0.00 0.00 0.00 310.00
44.00 (iv)900mm i/d D.I. Pipe line laid complete 78.00 Each 270.00 21060.00 0.00 0.00 0.00 0.00 270.00
45.00 (v)800mm i/d D.I. Pipe line laid complete 5.00 Each 248.00 1240.00 0.00 0.00 0.00 0.00 248.00
46.00 (vi)700mm i/d D.I. Pipe line laid complete 60.00 Each 217.00 13020.00 0.00 0.00 0.00 0.00 217.00
47.00 (vii) 600mm i/d D.I. Pipe line laid complete 117.00 Each 186.00 21762.00 0.00 0.00 0.00 0.00 186.00
48.00 (viii)500mm i/d D.I. Pipe line laid complete 30.00 Each 141.00 4230.00 0.00 0.00 0.00 0.00 141.00
49.00 (ix)450mm i/d D.I. Pipe line laid complete 7.00 Each 124.00 868.00 0.00 0.00 0.00 0.00 124.00
50.00 (x)400mm i/d D.I. Pipe line laid complete 5.00 Each 111.00 555.00 0.00 0.00 0.00 0.00 111.00
51.00 (xi)350mm i/d D.I. Pipe line laid complete 28.00 Each 91.00 2548.00 0.00 0.00 0.00 0.00 91.00
52.00 (xii)300mm i/d D.I. Pipe line laid complete 37.00 Each 82.00 3034.00 0.00 0.00 0.00 0.00 82.00
53.00 (xiii)250mm i/d D.I. Pipe line laid complete 5.00 Each 72.00 360.00 0.00 0.00 0.00 0.00 72.00
54.00 (xiv)200mm i/d D.I. Pipe line laid complete 5.00 Each 57.00 285.00 0.00 0.00 0.00 0.00 57.00
55.00 (xv)150mm i/d D.I. Pipe line laid complete 5.00 Each 46.00 230.00 0.00 0.00 0.00 0.00 46.00
56.00 7/Appd Item 53.00 Each 208.32 11041.00 0.00 0.00 0.00 0.00 209.00
Cutting D.I. pipes and specials and chipping or filling the surface
to a uniform finish complete in all respect as per direction and
satisfaction of Engineer-in-Charge.
(i)1200mm i/d D.I. pipe line laid complete
57.00 (ii)1100mm i/d D.I. Pipe line laid complete 35.00 Each 190.96 6684.00 0.00 0.00 0.00 0.00 191.00
58.00 (iii)1000mm i/d D.I. Pipe line laid complete 12.00 Each 173.60 2083.00 0.00 0.00 0.00 0.00 174.00
59.00 (iv)900mm i/d D.I. Pipe line laid complete 171.00 Each 156.24 26717.00 0.00 0.00 0.00 0.00 157.00
60.00 (v)800mm i/d D.I. Pipe line laid complete 11.00 Each 138.88 1528.00 0.00 0.00 0.00 0.00 139.00
61.00 (vi)700mm i/d D.I. Pipe line laid complete 132.00 Each 121.52 16041.00 0.00 0.00 0.00 0.00 122.00
62.00 (vii) 600mm i/d D.I. Pipe line laid complete 258.00 Each 104.16 26873.00 0.00 0.00 0.00 0.00 105.00
63.00 (viii)500mm i/d D.I. Pipe line laid complete 65.00 Each 91.92 5975.00 0.00 0.00 0.00 0.00 92.00
64.00 (ix)450mm i/d D.I. Pipe line laid complete 15.00 Each 75.84 1138.00 0.00 0.00 0.00 0.00 76.00
65.00 (x)400mm i/d D.I. Pipe line laid complete 11.00 Each 66.96 737.00 0.00 0.00 0.00 0.00 67.00
66.00 (xi)350mm i/d D.I. Pipe line laid complete 61.00 Each 58.08 3543.00 0.00 0.00 0.00 0.00 59.00
67.00 (xii)300mm i/d D.I. Pipe line laid complete 82.00 Each 46.32 3798.00 0.00 0.00 0.00 0.00 47.00
68.00 (xiii)250mm i/d D.I. Pipe line laid complete 11.00 Each 37.44 412.00 0.00 0.00 0.00 0.00 38.00
69.00 (xiv)200mm i/d D.I. Pipe line laid complete 11.00 Each 31.92 351.00 0.00 0.00 0.00 0.00 32.00
70.00 (xv)150mm i/d D.I. Pipe line laid complete 11.00 Each 25.20 277.00 0.00 0.00 0.00 0.00 26.00
71.00 8/Appd Item 2.00 Each 122810.00 245620.00 149954.00 299908.00 0.00 5,998.16 15,295.31 3,21,201.47 14,995.40
Providing, making and Jointing MS Flanges with companion
Flange as per IS:1538 with Flange Joints including Nuts, Bolts,
Washers, Gaskets for PN 1.6
(i)1600mm i/d D.I. pipe line laid complete
72.00 (ii)1500mm i/d D.I. Pipe line laid complete 3.00 Each 103660.00 310980.00 126994.00 380982.00 0.00 7,619.64 19,430.08 4,08,031.72 12,699.40
73.00 (iii)1400mm i/d D.I. Pipe line laid complete 1.00 Each 82450.00 82450.00 106369.00 106369.00 0.00 2,127.38 5,424.82 1,13,921.20 10,636.90
74.00 (iv)1200mm i/d D.I. Pipe line laid complete 2.00 Each 62560.00 125120.00 71843.00 143686.00 0.00 2,873.72 7,327.99 1,53,887.71 7,184.30
75.00 (v)1100mm i/d D.I. Pipe line laid complete 1.00 Each 51400.00 51400.00 57736.00 57736.00 0.00 1,154.72 2,944.54 61,835.26 5,773.60
76.00 (vi)1000mm i/d D.I. Pipe line laid complete 1.00 Each 42630.00 42630.00 45567.00 45567.00 0.00 911.34 2,323.92 48,802.26 4,556.70
77.00 (vii)900mm i/d D.I. Pipe line laid complete 6.00 Each 34020.00 204120.00 35198.00 211188.00 0.00 4,223.76 10,770.59 2,26,182.35 3,519.80
78.00 (viii)800mm i/d D.I. Pipe line laid complete 1.00 Each 29110.00 29110.00 26487.00 26487.00 0.00 529.74 1,350.84 28,367.58 2,648.70
79.00 (ix)700mm i/d D.I. Pipe line laid complete 6.00 Each 21790.00 130740.00 19291.00 115746.00 0.00 2,314.92 5,903.05 1,23,963.97 1,929.10
80.00 (x) 600mm i/d D.I. Pipe line laid complete 9.00 Each 16460.00 148140.00 12597.00 113373.00 0.00 2,267.46 5,782.02 1,21,422.48 1,259.70
81.00 (xi)500mm i/d D.I. Pipe line laid complete 3.00 Each 15100.00 45300.00 8827.00 26481.00 0.00 529.62 1,350.53 28,361.15 882.70
82.00 (xii)450mm i/d D.I. Pipe line laid complete 2.00 Each 11350.00 22700.00 7006.00 14012.00 0.00 280.24 714.61 15,006.85 700.60
83.00 (xiii)400mm i/d D.I. Pipe line laid complete 3.00 Each 8800.00 26400.00 6411.00 19233.00 0.00 384.66 980.88 20,598.54 641.10
84.00 (xiv)350mm i/d D.I. Pipe line laid complete 3.00 Each 7110.00 21330.00 5091.00 15273.00 0.00 305.46 778.92 16,357.38 509.10
85.00 (xv)300mm i/d D.I. Pipe line laid complete 4.00 Each 5540.00 22160.00 3727.00 14908.00 0.00 298.16 760.31 15,966.47 3,500.00
86.00 (xvi)250mm i/d D.I. Pipe line laid complete 3.00 Each 4420.00 13260.00 2501.00 7503.00 0.00 150.06 382.65 8,035.71 4,500.00
87.00 (xvii)200mm i/d D.I. Pipe line laid complete 3.00 Each 3360.00 10080.00 1814.00 5442.00 0.00 108.84 277.54 5,828.38 6,000.00
88.00 (xviii)150mm i/d D.I. Pipe line laid complete 3.00 Each 2500.00 7500.00 1159.00 3477.00 0.00 69.54 177.33 3,723.87 200.00
89.00 9/Appd Item 30739.00 Per Kg. 120.00 3688680.00 80.00 2459120.00 0.00 49,182.40 1,25,415.12 26,33,717.52 8.00
Providing and fixing of D. I. flanged or socketted specials of sizes
100mm to 1000mm confirming to B.S: KN: S45/1995 class 'A'
series K-12 with latest revision of reputed make like Electrosteel,
casting ltd. complete in all respect to the satisfaction of the
Engineer-in-Charge.
(i)100-300 mm i/d DI Pipe 337
ii)350-450 mm i/d DI Pipe 707
iii) 500-600 mm i/d Pipe 7372
iv) 700-800 mm i/d Pipe 6895
v) 900 mm i/d DI Pipe 9943
vi) 1000 mm i/d DI Pipe 5485
30739
90.00 10/Appd Item 10737.00 Per Kg. 110.00 1181070.00 80.00 858960.00 0.00 17,179.20 43,806.96 9,19,946.16 8.00
Providing and fixing of C. I. flanged or socketted specials of sizes
1100mm to 1200mm confirming to I.S: 1538( Part VII - 1976)
duly ISI Mark with latest revision of IS Code of reputed make
complete in all respect to the satisfaction of the Engineer-in-
Charge.
i) 1100-1200 mm i/d DI Pipe
91.00 11/10.9 i) 327.59 Per Cum 687.10 1237979.00 0.00 0.00 0.00 0.00 3,500.00
Cement concrete 1:2:4 with stone aggregate 20mm nominal size
for reinforced concrete work in footing, strips, foundations,
beams, rafts, pedestals and approach slabs of bridges etc.
excluding steel reinforcement and including centering &
shuttering, laid in position, complete in all respects (for work
upto 1.5 metres below ground level). For Thrust Blocks and
Anchor Blocks
92.00 (ii) For works below 1.5 M depth BGL upto 4 M BGL 163.80 Per Cum 693.10 624414.00 0.00 0.00 0.00 0.00 4,000.00
93.00 12/18.22 24.57 Per Qtl. 917.05 135192.00 0.00 0.00 0.00 0.00 6,000.00
FE-500 EQR TMT steel bars of approved makes for RCC work
where not included in the complete rate of RCC, including
bending, binding and placing in position complete.
94.00 13/Appd Item 2.00 Each 4070970.00 8141940.00 3037500.00 6075000.00 0.00 1,21,500.00 3,09,825.00 65,06,325.00 3,03,750.00
Providing and fixing of D.I. Sluice valves of IVC /VAG make, PN-
1.6 rating (non rising type )confirming to IS:14846-DIN- 3352 /
BS-5163 bldg-IS-1865 G-400/1500/7 (with latest revision)
specifications sluice valves to be provided with back thrust
bearing and spur gear arrangement for easy operation, along
with contingent material required for their fixing i.e. Rubber
Gaskets, Nut, Bolt & Washer for Flanged Joints with pipes and
specials laid in trenches complete in all respect to the entire
satisfaction of the Engineer-in-Charge.
(i)1600mm i/d D.I. Pipe line laid complete
95.00 (ii)1500mm i/d D.I. Pipe line laid complete 3.00 Each 3550050.00 10650150.00 2343750.00 7031250.00 0.00 1,40,625.00 3,58,593.75 75,30,468.75 2,34,375.00
96.00 (iii)1400mm i/d D.I. Pipe line laid complete 1.00 Each 3255057.00 3255057.00 1921875.00 1921875.00 0.00 38,437.50 98,015.63 20,58,328.13 1,92,187.50
97.00 (iv)1200mm i/d D.I. Pipe line laid complete 2.00 Each 2323942.00 4647884.00 1270312.50 2540625.00 0.00 50,812.50 1,29,571.88 27,21,009.38 1,27,031.25
98.00 (v)1100mm i/d D.I. Pipe line laid complete 1.00 Each 2157241.00 2157241.00 1178906.25 1178906.25 0.00 23,578.13 60,124.22 12,62,608.59 1,17,890.63
99.00 (vi)1000mm i/d D.I. Pipe line laid complete 1.00 Each 1656704.00 1656704.00 904687.50 904687.50 0.00 18,093.75 46,139.06 9,68,920.31 90,468.75
100.00 (vii)900mm i/d D.I. Pipe line laid complete 6.00 Each 1306486.00 7838916.00 713906.25 4283437.50 0.00 85,668.75 2,18,455.31 45,87,561.56 71,390.63
101.00 (viii)800mm i/d D.I. Pipe line laid complete 1.00 Each 982154.00 982154.00 532031.25 532031.25 0.00 10,640.63 27,133.59 5,69,805.47 53,203.13
102.00 (ix)700mm i/d D.I. Pipe line laid complete 6.00 Each 768802.00 4612812.00 421875.00 2531250.00 0.00 50,625.00 1,29,093.75 27,10,968.75 42,187.50
103.00 (x) 600mm i/d D.I. Pipe line laid complete 9.00 Each 488229.00 4394061.00 267187.50 2404687.50 0.00 48,093.75 1,22,639.06 25,75,420.31 26,718.75
104.00 (xi)500mm i/d D.I. Pipe line laid complete 3.00 Each 323509.00 970527.00 178125.00 534375.00 0.00 10,687.50 27,253.13 5,72,315.63 17,812.50
105.00 (xii)450mm i/d D.I. Pipe line laid complete 2.00 Each 277906.00 555812.00 140625.00 281250.00 0.00 5,625.00 14,343.75 3,01,218.75 14,062.50
106.00 (xiii)400mm i/d D.I. Pipe line laid complete 2.00 Each 203640.00 407280.00 112500.00 225000.00 0.00 4,500.00 11,475.00 2,40,975.00 11,250.00
107.00 (xiv)350mm i/d D.I. Pipe line laid complete 3.00 Each 189986.00 569958.00 99843.75 299531.25 0.00 5,990.63 15,276.09 3,20,797.97 9,984.38
108.00 (xv)300mm i/d D.I. Pipe line laid complete 4.00 Each 88171.00 352684.00 30468.75 121875.00 0.00 2,437.50 6,215.63 1,30,528.13 3,046.88
109.00 (xvi)250mm i/d D.I. Pipe line laid complete 2.00 Each 58840.00 117680.00 30468.75 60937.50 0.00 1,218.75 3,107.81 65,264.06 3,046.88
110.00 (xvii)200mm i/d D.I. Pipe line laid complete 2.00 Each 35439.00 70878.00 22500.00 45000.00 0.00 900.00 2,295.00 48,195.00 2,250.00
111.00 (xviii)150mm i/d D.I. Pipe line laid complete 2.00 Each 26580.00 53160.00 14062.50 28125.00 0.00 562.50 1,434.38 30,121.88 1,406.25
112.00 14/Appd Item 10.00 Each 110040.00 1100400.00 56250.00 562500.00 0.00 11,250.00 28,687.50 6,02,437.50 5,625.00
Providing & fixing DI Tamper proof Single Chamber double orfic,
double action (automatic) makes IVC / VAG Air Valve- CI FG 200
construction, SSAISI 304 Float, EPDMLPC complete with CI
isolating Sluice Valve generally confirming to AWWAC-512 rating
1.6 complete in all respect to the satisfaction of Engineer-In-
Charge.
(i)200mm i/d
113.00 (ii)150mm i/d 20.00 Each 80959.00 1619180.00 43125.00 862500.00 0.00 17,250.00 43,987.50 9,23,737.50 4,312.50
114.00 (iii)100mm i/d 24.00 Each 64101.00 1538424.00 33750.00 810000.00 0.00 16,200.00 41,310.00 8,67,510.00 3,375.00
115.00 (iv)80mm i/d 10.00 Each 48921.00 489210.00 26250.00 262500.00 0.00 5,250.00 13,387.50 2,81,137.50 2,625.00
116.00 15/Appd Item 2.00 Each 3580000.00 7160000.00 3600000.00 7200000.00 0.00 1,44,000.00 3,67,200.00 77,11,200.00 3,60,000.00
Providing & fixing of Mild steel zero velocity valves (ZVV) of IVC /
VAG makes of D.I. confirming of IS - 1865 Gr. 400 / 15 or 500 / 7
PN 1.6 as per relevant specification complete in all respect to the
entire satisfaction of Engineer -in -charge
(i)1600mm i/d
117.00 16/Appd Item 2.00 Each 261210.00 522420.00 195908.00 391816.00 0.00 7,836.32 19,982.62 4,19,634.94 19,590.80
Providing flexible MS/DI Dismantling Joint between flanges for
fixing Sluice Valves on-line. The minimum clearance of the
Dismantling Joint shall be 5cms and pressure rating shall be
PN1.6 including cost of providing Flanged Joints complete in all
respect as per satisfaction of the Engineer-In-Chief
(i)1600mm i/d M.S. pipe line laid complete
118.00 (ii)1500mm i/d D.I. Pipe line laid complete 3.00 Each 213770.00 641310.00 160328.00 480984.00 0.00 9,619.68 24,530.18 5,15,133.86 16,032.80
119.00 (iii)1400mm i/d D.I. Pipe line laid complete 1.00 Each 176730.00 176730.00 132548.00 132548.00 0.00 2,650.96 6,759.95 1,41,958.91 13,254.80
120.00 (iv)1200mm i/d D.I. Pipe line laid complete 2.00 Each 142490.00 284980.00 106868.00 213736.00 0.00 4,274.72 10,900.54 2,28,911.26 10,686.80
121.00 (v)1100mm i/d D.I. Pipe line laid complete 1.00 Each 112960.00 112960.00 84720.00 84720.00 0.00 1,694.40 4,320.72 90,735.12 8,472.00
122.00 (vi)1000mm i/d D.I. Pipe line laid complete 1.00 Each 96010.00 96010.00 72008.00 72008.00 0.00 1,440.16 3,672.41 77,120.57 7,200.80
123.00 (vii)900mm i/d D.I. Pipe line laid complete 6.00 Each 78140.00 468840.00 58605.00 351630.00 0.00 7,032.60 17,933.13 3,76,595.73 5,860.50
124.00 (viii)800mm i/d D.I. Pipe line laid complete 1.00 Each 62690.00 62690.00 47018.00 47018.00 0.00 940.36 2,397.92 50,356.28 4,701.80
125.00 (ix)700mm i/d D.I. Pipe line laid complete 6.00 Each 46670.00 280020.00 35003.00 210018.00 0.00 4,200.36 10,710.92 2,24,929.28 3,500.30
126.00 (x) 600mm i/d D.I. Pipe line laid complete 9.00 Each 37000.00 333000.00 27750.00 249750.00 0.00 4,995.00 12,737.25 2,67,482.25 2,775.00
127.00 (xi)500mm i/d D.I. Pipe line laid complete 3.00 Each 25050.00 75150.00 18788.00 56364.00 0.00 1,127.28 2,874.56 60,365.84 1,878.80
128.00 (xii)450mm i/d D.I. Pipe line laid complete 2.00 Each 22440.00 44880.00 16830.00 33660.00 0.00 673.20 1,716.66 36,049.86 1,683.00
129.00 (xiii)400mm i/d D.I. Pipe line laid complete 2.00 Each 19030.00 38060.00 14273.00 28546.00 0.00 570.92 1,455.85 30,572.77 1,427.30
130.00 (xiv)350mm i/d D.I. Pipe line laid complete 3.00 Each 14580.00 43740.00 10935.00 32805.00 0.00 656.10 1,673.06 35,134.16 1,093.50
131.00 (xv)300mm i/d D.I. Pipe line laid complete 4.00 Each 11870.00 47480.00 8903.00 35612.00 0.00 712.24 1,816.21 38,140.45 890.30
132.00 (xvi)250mm i/d D.I. Pipe line laid complete 2.00 Each 9580.00 19160.00 7185.00 14370.00 0.00 287.40 732.87 15,390.27 718.50
133.00 (xvii)200mm i/d D.I. Pipe line laid complete 2.00 Each 7780.00 15560.00 5835.00 11670.00 0.00 233.40 595.17 12,498.57 583.50
134.00 (xviii)150mm i/d D.I. Pipe line laid complete 2.00 Each 6200.00 12400.00 4650.00 9300.00 0.00 186.00 474.30 9,960.30 465.00
135.00 17/18.12 30.00 Per Qtl. 1040.35 187263.00 0.00 0.00 0.00 0.00 6,000.00
Wrought iron and mild steel (using flats square bars tee and
channels 1adders, grills, grating frames window guards iron door
open able or fixed stair case or parapet or any other type of
railing gates and tree guards etc. including cost of screws and
welding rods or bolts nuts completed fixed in position.
136.00 18/6.7+6.2c(ii) 1570.00 Per % Cum 945.25 69750.00 0.00 0.00 0.00 0.00 70.00
Earth work in excavation for foundations, trenches under ground
structures in ordinary soil, dewatering of rain water stacking of
excavated earth clear from the edge of the excavation &
subsequant filling in 15 cms layers with comaction & disposal of
surplus earth with in 30 Meters lead for depth upto 2.0 M below
NGL
137.00 19/10.38 + Note(v)e 64.00 Per Cum 420.00 147840.00 0.00 0.00 0.00 0.00 5,000.00
Cement concrete 1:4:8 with stone aggregate of 20 mm in
foundation and Plinth.
138.00 20/10.79 + Note(e)2 152.00 Per Cum 628.35 525301.00 0.00 0.00 0.00 0.00 5,000.00
CC (1:2:4) for RCC work excluding reinforcement centering &
shuttering in f & P Base slab
139.00 21/10.87 251.00 Per Cum 1400.00 1932700.00 0.00 0.00 0.00 0.00 8,000.00
CC (1:2:4) for RCC work excluding reinforcement for walls ,
beams stairs, columns etc. excluding reinforcement but including
cent. & shut. WallsFor valves upto 20cm thickness
140.00 22/10.82 126.00 Per Cum 997.90 691545.00 0.00 0.00 0.00 0.00 7,000.00
CC (1:2:4) for RCC work excluding reinforcement for slabs
excluding reinforcement but including cent. & shut.
141.00 22/18.22 25.00 Per Qtl. 917.05 137558.00 0.00 0.00 0.00 0.00 5,500.00
Fe 500 EQR TMT Steel bars for RCC, works, where not included in
the complete rate of RCC including bending binding and placing
in position complete.
142.00 24/29.28 807.00 Each 90.00 159786.00 0.00 0.00 0.00 0.00 0.00
Providing & fixing Steel Bars embede plastic steps of Size
263mmX165mm minimum 3mm thick Poly-Propylene Polymer
confirming to IS:1090 including cost of setting the same duly
embeded 1:2:4CC complete in all respect
143.00 25/29.94 129.00 Each 1200.00 162540.00 0.00 0.00 0.00 0.00 0.00
Providing & fixing SSFRC Man Hole Cover and frame marked with
IS:12592 complete in all respect to the satisfaction of Engineer-
In-Charge. Type extra heavy duty set EHD35-560mm clear
opening.
144.00 26/24.37 1800.00 Per 100 Sqm 296.70 25101.00 0.00 0.00 0.00 0.00 0.00
Dismantling of Road including soling and wearing coat, Screening
and stacking of all serviceable material complete in all respect
145.00 27/Appd Item 1800.00 Per Sqm 1560.00 2808000.00 0.00 0.00 0.00 0.00 1,500.00
Restoration of Road Cuts including 100mm thick one layer of
stone soiling 63mm-45mm and 100mm thick two layer of stone
metal 53mm to 22.4mm and 50mm thick BM & 40mm thick BC
including the cost of sand filling and including the cost of
dismantling of roads etc. complete in all respect
146.00 28/Appd Item 1.00 Per Job 50000.00 50000.00 0.00 0.00 0.00 0.00 5,00,000.00
Structural design and drawing of thrust block will be got carried
out from approved institute such as IIT Delhi, NIT KKR, PEC
Chandigarh, NCB Ballabgarh, CRRI etc. and work will be executed
as per approved design.
147.00 29/Appd Item 1.00 Per Job 150000.00 150000.00 0.00 0.00 0.00 0.00 2,00,000.00
Surge Analysis :- Providing water hammer (surge) analysis
using software programme for safety of piping system and valve
& pumps against transient pressure rise due water hammer as
encountered in system handling various boundary conditions
such as pumps, reservoir, flow contral valves, pipe junctions, air
vvalve, sluice valve / 2 - valves including designing of surge
protection system for maximum and minimum pressure with in
specified limit, ware speed / velocities, start up, shut down and
tripping of pumps, ground condition etc. and evaluation with
graphical representation, Surge analysis shall be done from IIS
Banglore.
148.00 30/Appd Item 3.00 Year 0.00 0.00 0.00 0.00 0.00 0.00 7,50,000.00
Annual maintenance of pipes and specials, sluice valve, other
valves installed in the water supply lines, complete in all respect.
(3 Years (including Ist year defect liability period) Free of cost
Total Estimated Cost in Figures 1155437574.00 780975448.99 0.00 8775755.95 23146487.26 812897692.13
Total of Installation/ civil Total A + B
4,19,74,080.00 4,19,74,080.00
1,71,68,200.00 1,71,68,200.00
1,07,35,560.00 1,07,35,560.00
1,12,75,000.00 2,27,81,936.33
63,75,000.00 1,17,70,874.82
70,75,000.00 1,16,42,536.81
89,82,400.00 15,58,00,446.76
1,33,35,000.00 23,13,77,396.13
21,16,800.00 3,50,03,065.05
4,57,320.00 68,29,320.00
19,46,385.00 3,43,86,135.00
5,42,700.00 95,87,700.00
64,26,997.50 11,35,43,622.50
3,26,268.00 57,64,068.00
33,04,620.00 5,83,81,620.00
50,16,702.60 8,86,28,412.60
9,99,877.76 1,76,64,507.15
1,96,350.00 34,68,850.00
1,17,513.00 20,76,063.00
5,42,595.00 95,85,845.00
5,85,748.80 1,03,48,228.80
61,941.00 10,94,291.00
46,266.00 8,17,366.00
34,974.49 6,17,882.74
29,82,096.00 29,82,096.00
17,280.00 17,280.00
1,19,250.00 1,19,250.00
34,117.00 34,117.00
2,89,850.00 2,89,850.00
14,976.00 14,976.00
1,60,800.00 1,60,800.00
2,44,192.00 2,44,192.00
49,980.00 49,980.00
10,080.00 10,080.00
6,000.00 6,000.00
28,860.00 28,860.00
35,015.00 35,015.00
3,900.00 3,900.00
3,600.00 3,600.00
3,500.00 3,500.00
8,928.00 8,928.00
5,440.00 5,440.00
1,550.00 1,550.00
21,060.00 21,060.00
1,240.00 1,240.00
13,020.00 13,020.00
21,762.00 21,762.00
4,230.00 4,230.00
868.00 868.00
555.00 555.00
2,548.00 2,548.00
3,034.00 3,034.00
360.00 360.00
285.00 285.00
230.00 230.00
11,077.00 11,077.00
6,685.00 6,685.00
2,088.00 2,088.00
26,847.00 26,847.00
1,529.00 1,529.00
16,104.00 16,104.00
27,090.00 27,090.00
5,980.00 5,980.00
1,140.00 1,140.00
737.00 737.00
3,599.00 3,599.00
3,854.00 3,854.00
418.00 418.00
352.00 352.00
286.00 286.00
29,990.80 3,51,192.27
38,098.20 4,46,129.92
10,636.90 1,24,558.10
14,368.60 1,68,256.31
5,773.60 67,608.86
4,556.70 53,358.96
21,118.80 2,47,301.15
2,648.70 31,016.28
11,574.60 1,35,538.57
11,337.30 1,32,759.78
2,648.10 31,009.25
1,401.20 16,408.05
1,923.30 22,521.84
1,527.30 17,884.68
14,000.00 29,966.47
13,500.00 21,535.71
18,000.00 23,828.38
600.00 4,323.87
2,45,912.00 28,79,629.52
85,896.00 10,05,842.16
11,46,565.00 11,46,565.00
6,55,200.00 6,55,200.00
1,47,420.00 1,47,420.00
6,07,500.00 71,13,825.00
7,03,125.00 82,33,593.75
1,92,187.50 22,50,515.63
2,54,062.50 29,75,071.88
1,17,890.63 13,80,499.22
90,468.75 10,59,389.06
4,28,343.75 50,15,905.31
53,203.13 6,23,008.59
2,53,125.00 29,64,093.75
2,40,468.75 28,15,889.06
53,437.50 6,25,753.13
28,125.00 3,29,343.75
22,500.00 2,63,475.00
29,953.13 3,50,751.09
12,187.50 1,42,715.63
6,093.75 71,357.81
4,500.00 52,695.00
2,812.50 32,934.38
56,250.00 6,58,687.50
86,250.00 10,09,987.50
81,000.00 9,48,510.00
26,250.00 3,07,387.50
7,20,000.00 84,31,200.00
39,181.60 4,58,816.54
48,098.40 5,63,232.26
13,254.80 1,55,213.71
21,373.60 2,50,284.86
8,472.00 99,207.12
7,200.80 84,321.37
35,163.00 4,11,758.73
4,701.80 55,058.08
21,001.80 2,45,931.08
24,975.00 2,92,457.25
5,636.40 66,002.24
3,366.00 39,415.86
2,854.60 33,427.37
3,280.50 38,414.66
3,561.20 41,701.65
1,437.00 16,827.27
1,167.00 13,665.57
930.00 10,890.30
1,80,000.00 1,80,000.00
1,09,900.00 1,09,900.00
3,20,000.00 3,20,000.00
7,60,000.00 7,60,000.00
20,08,000.00 20,08,000.00
8,82,000.00 8,82,000.00
1,37,500.00 1,37,500.00
0.00 0.00
0.00 0.00
0.00 0.00
27,00,000.00 27,00,000.00
5,00,000.00 5,00,000.00
2,00,000.00 2,00,000.00
22,50,000.00 22,50,000.00
160687178.13 973584870.27
Class in ELECTROTHE
Sr. Nominal Dia. which Pipes Excise Duty
JINDAL SAW JAIBALAJI RM
Quantity FOR ( Site) FOR ( Site) FOR ( Site)
No of Pipe (mm) are to be Category
Prices Prices Prices
supplied
ED/ EE
( meter ) Rs./ Meter Rs./ Meter Rs./ Meter
Category
1 150 K9 EE 550 1060
2 200 K9 EE 550 1527 1402 1461
3 250 K9 EE 550 2046 1877 1957
4 300 K9 EE 4095 2594 2384 2461
5 350 K9 EE 3050 3239 2965 3067
6 400 K9 EE 550 3805 3561 3688
7 450 K9 EE 770 4569 4250 4389
8 500 K9 EE 3270 5096
9 600 K9 EE 12915 7082 6474 6723
10 700 K9 EE 6600 9041 8345 8941
11 800 K9 EE 530 11087 10260 11256
12 900 K9 EE 8525 13642 12565 13708
13 1000 K9 EE 600 16264 15075 16037
14 1100 K9 EE 1750 18537 19393
15 1200 K9 EE 300 21240
ELECTROTHE
Sr. Nominal Dia. Total DI JINDAL SAW JAIBALAJI RM
No of Pipe (mm)
Weight Quantity
Pipe weight
FOR ( Site) FOR ( Site) FOR ( Site)
Prices Prices Prices
Kg/ Mtr ( meter ) Rs./ Meter Rs./ Meter Rs./ Meter
1 150 23.09 550 12699.5 1108 1017 1060
2 200 31.83 3900 124137 1527 1402 1461
3 250 42.5 4900 208250 2046 1877 1957
4 300 53.96 9100 491036 2594 2384 2461
5 350 66.73 6000 400380 3239 2965 3067
6 400 80.42 4000 321680 3805 3561 3688
7 450 95.31 5100 486081 4569 4250 4389
8 500 111.43 3270 364376.1 5368 4907 5096
9 600 147 6250 918750 7082 6474 6723
10 700 187.2 3325 622440 9041 8345 8941
11 800 232.35 4250 987487.5 11087 10260 11256
12 900 281.96 9500 2678620 13642 12565 13708
13 1000 336.32 9100 3060512 16264 15075 16037
14 1100 403.58 4000 1614336 0 18537 19393
15 1200 484.30 2000 968601.6 0 21240
13246687.2
13246.6872
ELECTROSTE
TATA
EL Discount
FOR ( Site)
FOR ( Site) Taken Rates
Prices Rates Taken
Prices Considered
AIR VALVES
1 80 10 35000 35000 25% 26250
2 100 24 45000 45000 25% 33750
3 150 20 57500 57500 25% 43125
4 200 10 75000 75000 25% 56250
Jash
ZERO VELOCITY VALVE
4 1600 2 4000000 4000000 10% 3600000
Pipe dia, mm Thk, mm
1600 15
1500 15
1400 14
1600 15
1500 15
1400 14
Area Area
Internal External CM lining, Rs Kg/
Length, m Wt Kg/ mtr m2/ mtr m2/ mtr Rs/ Mtr LPE/ Mtr mtr Total Rate
300.00 594.65047495 5.026548 5.073672 200 1500 43 34185.79
150.00 557.65822145 4.712389 4.759513 200 1500 43 32061.05
150.00 485.78227291 4.39823 4.442212 200 1500 43 28431.6
178395.14248
83648.733218
72867.340936
0
2384548.4045
3541129.7062
524644.85474
6785.2341821
6,792.02
Jack Pushing Work
Diameter wise Rate per meter RCC NP4 and Mild Steel Pipe Jack-pushing by hand mining method for diff
and various Depth in Indian Soil under Existing Structure like Railway track , Road, Canal, Building, Runway
Stable Soil which can be excavated by spade and shovel **
Sl No Dia Of Pipe Transprota Depth Of Depth Of Supply Of Drilling & For welding
in MM tion Of Launching Exit PitMS Pipe As Pushing Of Joint of
Machinery Pit per Railway MS Pipe
To & Fro Guideline BS-
105/2009 per
upto 4 M M 3 Mtrs
upto (6M X 4M) upto 4 up to 60 M longMS
250KM M(4M X Pipe
4M)
2333 75000
3500 75000
4667 75000
5833 75000
7000 75000
8167 75000
9333 75000
10500 75000
11667 75000
12833 75000
Flanges