Академический Документы
Профессиональный Документы
Культура Документы
Фекальный насос ТО
Pumps M 6
Fire & Ballast pump (Stbd) -Overhaul/
Пожарный/Балластный насос (ПрБ) - ТО Pumps M 12
Master's Name:______________________
Signature:________________________
Remarks/Примечание
Vessel: P&O BALQIS PMS (WEEKLY CHECK / MAINTENANCE); EVERY FRIDAY SATURDAY/ ТО (Еженедельные проверки и обслуживания) / Каждую пятницу и субботу
Month: August, 2019
NOTE: √=OK; X= NOT OK pls put date & sign against each box. In case of any problems contact Technical Superintendent
Description Описание Cat. Week A: 30 to 35 Week B: 36 to 42 Week C: 43 to 48 Week D: 25 to 31
S. No
* Critical Equipment * Критическое оборудование OK or NOT OK Date/ Sign OK or NOT OK Date/ Sign OK or NOT OK Date/ Sign OK or NOT OK Date/ Sign
* Main Engine (Port & Starboard) *ГД (ПрБ, ЛБ) header
9 Check Forward Winch Power Pack Oil Level Проверьте уровень масла в силовом M
агрегате носовой лебедки ok 7/31/2019 OK 8/29/2019 ok ok 6/24/2019
10 Fifi Pump Gear Box Level Пожарный Насос / Уровень в редукторе M
33 Check exterior hull accom for damage Проверить внешнюю часть надстойки M
на предмет повреждений
ok 8/31/2019
34 Check exterior hull accomodation for Проверить внешнюю часть надстойки M
paintwork на предмет окраски ok 8/31/2019
35 Check operation of both winch drums Проверить работу двух барабанов M
лебедки ok 8/31/2019 Ok 8/29/2019 ok ok 6/29/2019
36 Test all electronic Navigation equipments Проверка всего электронного
навигационного оборудования E ok 8/31/2019
37 Check operation of all window wipers & Проверка в работе всех
washers стеклоочистителей и омывателей E ok 8/31/2019
Towing Hook Буксирный гак header
Srl. No Machinery Batt. No. Location Capacity Volt Actual CCA Measured CCA Remarks
1 G/E 1 Service Battery 1 Engine Room 12V 200 Ah 12.90
2 - 12V 200 Ah 12.80
2 G/E 2 Service Battery 1 - 12V 200 Ah 13.00
2 - 12V 200 Ah 13.00
3 M/E Start Battery 1 Engine Room 12V 200 Ah 12.60
2 - 12V 200 Ah 12.7
4 Other Battery 1 12V 5.2 Ah 13.10
2 12V 5.2 Ah 13.00
5 GMDSS Battery 1 Port Deck 12V 200 Ah 12.70
2 - 12V 200 Ah 12.60
6 Emgr Light Battery 1 Stbd Deck Fwd 12V 200 Ah 12.8
2 12V 200 Ah 12.80
3 12V 200 Ah 12.80
4 12V 200 Ah 12.70
7 Radio Battery 1 Stbd Deck Aft 12V 200 Ah 12.70
2 12V 200 Ah 12.60
3 12V 200 Ah 12.80
4 12V 200 Ah 12.80
Engineer's Name:______________________
Kravchenko V.A
Signature:________________________
Vessel: P&O BALQIS PMS - Fire Alarm Testing Schedule/ График ТО Пожарной сигнализации
Month: August, 2019
NOTE: √=OK; X= NOT OK pls put date & sign against each box. In case of any problems contact Technical Superintendent
Month : A Month : B
No. Location Description Type
OK or NOT OK date/ sign OK or NOT OK date/ sign Remarks
1 Wheelhouse Wheelhouse Smoke OK 8/23/2019
2 Upper Accomodation In Messroom Smoke ok 8/23/2019
3 Upper Accomodation Lobby Smoke ok 8/23/2019
4 Upper Accomodation Laundry Smoke ok 8/23/2019
5 Upper Accomodation Galley Heat ok 8/23/2019
6 Lower Accomodation Lobby Smoke ok 8/23/2019
7 Lower Accomodation Deck Store Smoke ok 8/23/2019
8 ECR Engine Control room Smoke ok 8/23/2019
9 Engine Room M/E Port Fwd Heat OK 8/23/2019
10 Engine Room M/E Stbd Fwd Smoke OK 8/23/2019
11 Engine Room M/E Port Aft Smoke OK 8/23/2019
12 Engine Room M/E Stbd Aft Heat ok 8/23/2019
13 Hold space E/R workshop Smoke ok 8/23/2019
14 Z drive room Z drive room Port Smoke ok 8/23/2019
15 Z drive room Z drive room Stbd Smoke ok 8/23/2019
Kravchenko V.A.
Engineer's Name:______________________
Signature:________________________
P&O
Battery Health Checkup BALQIS August, 2019
Srl.
Machinery Batt. No. Location Capacity Volt Remarks
No
1 G/E 1 Service Battery 1 Engine Room 12V 200 Ah 12.70 Chaged New Battery N200/200Ah 31/3/18
2 - 12V 200 Ah 12.70 Chaged New Battery N200/200Ah 31/3/18
2 G/E 2 Service Battery 1 Engine Room 12V 200 Ah 13.00 Free Maintenance
2 - 12V 200 Ah 13.00 Free Maintenance
3 M/E PORT Battery 1 Engine Room 12V100Ah/800A 12.80 NUMAX SILVER Free Maintenance / 16.08.18
2 - 12V100Ah/800A 12.70 NUMAX SILVER Free Maintenance / 16.08.18
4 M/E STBD Battery 1 Engine Room 12V100Ah/810A 12.6 Alpha Line Free Maintenance / 09.06.18
2 12V100Ah/810A 12.6 Alpha Line Free Maintenance / 09.06.18
5 Schottel power 1 Engine Room 12v200ah/1165A 12.80 FULMEN Free Maitenance
2 - 12v200ah/1165A 12.80 FULMEN Free Maitenance
6 Emerg GMDSS 1 Port Deck 12V 200 Ah 12.70 SPEED FIRE Free Maintenance/ 16.08.18
2 - 12V 200 Ah 12.60 SPEED FIRE Free Maintenance/ 16.08.18
7 Emgr Light 1 Stbd Deck Fwd 12V 200 Ah 12.8 QIAGXIN 6-QA-200 Free Maintenance / 27.10.15
DC-1 2 12V 200 Ah 12.70 QIAGXIN 6-QA-200 Free Maintenance / 27.10.15
3 12V 200 Ah 12.80 QIAGXIN 6-QA-200 Free Maintenance / 27.10.15
4 12V 200 Ah 12.8 QIAGXIN 6-QA-200 Free Maintenance / 27.10.15
8 Emerg Radio Battery 1 Stbd Deck Aft 12V 200 Ah 12.60 EXIDE Free Maintenance .
DC-2 2 12V 200 Ah 12.70 Changed on 23.11.2018
3 12V 200 Ah 12.70 EXIDE
4 12V 200 Ah 12.80 EXIDE
9 Fire Alarm 1 Bridge 12V 5.2 Ah 12.80 VRLA Battery Free Maintenance
2 12V 5.2 Ah 12.80 VRLA Battery Free Maintenance
Hoses N3 work
3 pressure114bar/31,5mm, Sea Forw.& Aft Winches M 12 N/R June,2019 good
Water, Visual check
Hoses ME 1 work
9 pressure215bar/19mm, FO Main Engine 12 N/R June,2019 good
Filter,Visual check
Hoses ME 3 work
11 pressure275bar/12,5mm, FO Main Engine 12 N/R June,2019 good
Small Filter, Visual check
20 Hoses ME 12, LO Hand Pump Line, Main Engine 12 N/R June,2019 good
Visual check
21 Hoses AE 1 work pressure, Visual Auxiliary Engine 12 N/R June,2019 2 pcs - good
check
22 Hoses AE 2 work pressure, Visual Auxiliary Engine 12 N/R June,2019 2 pcs - good
check
Hoses N3 work
3 pressure114bar/31,5mm, Sea Forw.& Aft Winches M 60 N/R Jan. 2017 good
Water, Visual check
Hoses N 5 work
5 pressure114bar/31,5mm, Forw.& Aft Winches 60 N/R Jan. 2017 good
Drtainage, Visual check
Hoses N3 work
3 pressure114bar/31,5mm, Sea Forw.& Aft Winches M 12 N/R June,2019 good
Water, Visual check
Hoses N 5 work
5 pressure114bar/31,5mm, same Forw.& Aft Winches 12 N/R June,2019 good
as #3 only shorter, Visual check
5/7 Hoses N 5/7 work pressure Forw.& Aft Winches 12 N/R June,2019 NO IN STORE
275bar/12,5mm, Visual check
Hoses N8 work
8 pressure114bar/31,5mm, same as Schottel 12 N/R June,2019 good
#6 only longer, Visual check
Hoses ME 1 work
10 pressure215bar/19mm, FO Main Engine 12 N/R June,2019 good
Filter,Visual check
Hoses ME 3 work
12 pressure275bar/12,5mm, FO Main Engine 12 N/R June,2019 good
Small Filter, Visual check
21 Hoses AE 3 work pressure, Visual Auxiliary Engine 12 N/R June,2019 2 pcs - good
check
Hoses N3 work
3 pressure114bar/31,5mm, Sea Forw.& Aft Winches M 60 N/R Jan. 2017 good
Water, Visual check
Hoses N 5 work
5 pressure114bar/31,5mm, Forw.& Aft Winches 60 N/R Jan. 2017 good
Drtainage, Visual check
Проведение ежегодного ТО
(сервисной компанией) перед
1 началом отопительного сезона/ Boiler M NA 12
Provide annual shore service prior
start heating inside ER