I PRELIMINARIES
g Skirting
WS ; 150mm High skirting to match floor
tiles complete as per Specification and
drawings .
(Supplier: RAK CERMAICS; Code:
(i) M2 23
A06GNEWP-LGY.X0F)
(Contact: Ms.Joan Flores Valenzuela, Mob:
+971-50 260 1657, Tel: +971 7 246 7000;
Email: joan.valenzuela@rakceramics.com)
s Paint Finish
X FALSE CEILING
Refurbish the existing false ceiling @ FOH
area including repainting the celing to
l match Black RAL 7022 (Matt) finish and M2 52
closing of any cut outs due to changes in
light fixtures.
Sub total for Item XI
XIII SIGNAGE
Supply and Install PH Standard LED Signages
complete as per drawing. Supplier details
are,
1. M/s Joseph Advertising company ,
(For UAE , Oman , Qatar and Bahrain)
Contact Person : Mrs. Neeru Nair / Mr.
Eldho Paul, Email id:
neeru.nair@josephgroup.ae,
Mob : +971 50 459 9204.
2. M/s Spotlight .
(For UAE , Oman , Qatar and Bahrain)
Contact Person : Mr. Nagesh Gowda, Email
id: nagesh@spotliteme.ae,
Mob : +971 55 140 4288.
XIV MISCELLANEOUS
Fix only owner supplied Furniture, Trash
j Bins complete the fixing with chemical bolt Item 1
lay in as per drawing.
Fix only owner supplied Wooden Divider
l PHTS - 1 complete the fixing with chemical Nos 3
bolt lay in as per drawing.
GENERAL NOTES:
Contractor has to review & Study the BOQ and Tender Drawings properly, any item missing in the BOQ
and it is shown in the drawing, contractor has to verify with the Project Manager prior to the
1
submission of quotation. If not, it will be completely contractors responsibility to finish those items
without any variation or without any additional cost.
Necessary arrangements of temporary water and electricity connections to the work site is
2
contractor's own responsibility.
Contractor to Submit the invoices and warranty card from the supplier for A/C units, Cold rooms units
3
to the Owner before Final handing over the Restaurant.
Contractor to procure Items from Nominated Suppliers wherever specified in the Drawings & Tender
Documents.Contractor to inform Project Manager or Designers & provide them with the Substitute
4 Materials for approval with Similar Specification in Case of Unavailability of Stock with the Supplier or
as a result of any delay that might affect the Project Timelines. No compensation shall be remitted to
the contractor in case of non-adherence of the Nominated materials.