Ref: PP/22/19/500

Date: 25.11.2019

To
Managing Director
Progress Group
Road # 01, Plot # 33, Dhanmondi R/A
Dhaka-1205, Bangladesh

SUB: QUOTATION FOR SUPPLY OF 11/0.415 KV, 200 KVA ELECTRICAL SUBSTATION EQUIPMENT.

Dear Sir

Thank you, very much for your interest in our product. We are pleased to enclose herewith our quotation
including the detail specification of our offered materials for your consideration under following terms.

DELIVERY : within 30 days after receipt of your confirmed work order with advance.

PAYMENT : 50% as advance along with work order, 20% after the satisfactory inspection by purchaser
at our factory before delivery, 20% after delivery & the rest 10% immediately after
commissioning.

WARRANTY : We offer maintenance and service warranty for 01 (One Years) only Transformer, LT, PFI
Replace service from the date of supply and assure also the supply of all spare Parts for at
least five years at a nominal charge.

Hope our offer will meet your requirement at this stage. If any further clarification is required do not hesitate to
contact with us.

Thanking you and assuring you of our best service at all times.

Truly yours.

----------------------------

Mohammad Asdur Rahman


CEO
Proven Power
TECHNICAL SPECIFICATION
200 KVA SUB-STATION EQUIPMENT

SL DESCRIPTION QTY.
NO.
1. UPPLY OF 200 KVA TRANSFORMER: 01NO.
3 Phase, 50Hz, oil immersed, naturally air cooled ONAN Distribution Transformer according
to VDE/IEC/BS standard with 3 H.T. Porcelain Bushing and 4 L.T Bushing, Arcing Horn,
Conservator, Oil Level Indicator, plugs for oil filling, sampling and draining, lifting lugs and
with first filling of oil in transformer as per BS. No. 148

Technical data:
Rated Capacity : 200KVA

Rated Frequency : 50 Hz

Rated Voltage:
Primary : 11000V
Secondary : 415V/240V at no load

BIL
Primary : 75KV
Secondary : 2.5KV

Vector group : Dyn11

Off -load tape changer : +2.5%, Rated, -2.5%, -5%, -7.5%

Tape changer : On HV side, off load type manually operated from out side

HV winding:
Inter-phase connection : Delta

LV winding:
Rated voltage : 415/240V

Inter phase connection : Star

Neutral : Fully insulated & brought out

Dielectric strength : 3 KV (for 1 mm)

Ambient temp : 40 C

HV winding : 28 KV, 1 minute

LT winding : 2.5 KV, 1 minute

Temperature rise
In oil : 60 C
In coil : 65 C
No load loss : 420 W

Full load loss : 2100W

In winding : 65 C

Impedance : 4.00% (at rated voltage)

Installation : Indoor / Outdoor

Cooling : ONAN

Conductor : Copper

Accessories:
- Silicagel breather
- Thermometer pocket with transformer

Brand : PROVEN POWER


Origin of oil : Savita Indian, HYRAX(Malaysia).
Origin of core : UK.

02. SUPPLY OF 320A L.T. SWITCHGEAR: 01NO.


Sheet steel clad dust and vermin proof free standing floor mounting type factory assembled
L.T. Switchgear with 500A TP&N hard drawn electrolytic copper busbars suitable for 415V, 3
phase, 4 wire, 50Hz operation complete with all wiring and gutter space for maximum size of
cable entrance suitable for both top and bottom sheet metal with spray painting. The
switchgear shall include the following components.
Incoming:
1 No. 320A, TP Molded Case Circuit Breaker with adjustable thermal overload and magnetic
short circuit release.
3 Nos. Current transformer, ratio 320/5A with suitable accuracy and burden.

1 No. Voltmeter scaled 0-500V size 96m X 96m with 6-way selector switch.

4 No. Ammeter scaled 0-320V size 96m X 96m with selector switch.

3 Nos. of indicating lamps (RS-ST-TR) for phase indication.

1 set control fuses of adequate rating.


Out going:
01 No. 200A, TP 415V, MCCB Molded Case Circuit Breaker thermal overload and magnetic
short circuit release.(For PFI Plant)
02 No. 100A, TP 415V, MCCB Molded Case Circuit Breaker thermal overload and magnetic
short circuit release.

0rigin of MCCB & MCB: ABB (Italy)

SUPPLY OF 120 KVAR P.F.I. PLANT:


01 NO.
03. Sheet steel clad free standing; floor mounting indoor type factory assembled 120 KVAR
completely automatic P.F.I Plant suitable for operation at 415V, 50Hz, in 5 switching steps,
comprising with the following components.

01 No. 5 KVAR, 415 V TP, P.F. Capacitor Bank with built-in-discharge coil directly connected
by fuse protection. (Fixed).

01 No. 5 KVAR, 415 V, 3 phase P.F. Capacitor Bank with built-in-discharge coil.

01 No. 10 KVAR, 415V, 3 phase P.F. Capacitor Bank with built-in-discharge coil.

04 Nos. 25 KVAR, 415V, 3 phase P.F. Capacitor Bank with built-in-discharge coil.

1 No. 6 stage Automatic Power Factor Correction relay, having computer controlled
adjustable inductive and reactive VAR, switching time capacitor stage and multiple setting
and LEAD/LAG (capacitive/inductive) interlocking with auxiliary relay.

06 Nos. Magnetic contactors with adequate rating.

21 Nos. HRC fuses with base of adequate ratings.

01 No. Auto/Manual selector switch.

01 Set of control switch with base.

Origin:
Capacitor Bank :) : Anner (Spain)
Relay: Mikro, Maylasia, Sujuki (Japan)
Magnetic Contractor: Donga (Korea)Togami(Japan)
01 NO.
LIGHTING ARRESTOR:
04.
Type : LA9KW

Rated Voltage (Normal) : 11KV

Rated maximum Voltage : 12KV

Rated arrester Voltage : {KV (rms)}

Frequency : 50Hz

Minimum Spark over (RMS) : 14KV

Maximum Spark over (RMS) : 40KV

Minimum Impulse Spark (RMS) : 45KV

Withstand Voltage
Power frequency 1 min dry : 28 KV
Power frequency 10 sec wet : 24 KV

Discharge current (crest) : 5KA

Impulse Current Withstand : 55KA


DROP OUT FUSE: 01 NO.
05.
Rated Voltage (Normal) : 11KV

Rated Maximum Voltage : 15KV

Rated Current (conti.) RMS : 100A

Rated fuse rating : 50A

Rated Frequency : 50Hz

BIL : 75KV

Interrupting Current (RMS) : 10KA

Withstand Voltage
-Wet, 1min : 35KV
-Wet, 10 sec : 30 KV

EARTHING: 04 Nos.
06.
Earthing with continuous of 4 SWG copper wires from equipment body to common earthing
bar.

The earthing shall be comprised of 2 feet long 1 inch dia GI pipe at the upper part, 4 SWG
100 feet long Cu wire and 2 feet long Cu rod at the bottom. If earthing result is not
satisfactory (Less than 1.0 Ohm in each electrode) with 4 Nos. Earthing then extra earthing
will be provided at additional cost of agreed rate.

INSTALLATION AND COMMISSIONING: L.S


07.
Installation, testing and commissioning of substation equipment such as, Transformer, LT
switchgear, PFI Plant Etc.

HEAT SHRINKABLE KIT:


08. 02 Sets
Supply & Installation of Heat Shrinkable Kit for HT cable terminal protection.
PRICE PROPOSAL
200 KVA SUB-STATION EQUIPMENT
PART–A

Item Description Qty. Unit Price Total Price


No. (TK.) (TK.)

01. 200 KVA TRANSFORMER 01 No. 4,20,000.00 4,20,000.00

02. 320A LT SWITCHGEAR 01 No. 1,20,000.00 1,20,000.00


1,25,000.
03. 120 KVAR PFI PLANT 01 No. 00 1,25,000.00

04. LIGHTNING ARRESTOR 01 No. 7,000.00 7,000.00

05. DROP OUT FUSE 01 No. 8,000.00 8,000.00

06. EARTHING FOR SOBSTATION 04 Nos. 15,000.00 60,000.00

07. INSTALATION OF SUB-STATION L.S 35,000.00 35,000.00

08. HEAT SHRINKABLE KIT 02 Sets 2,500.00 5,000.00

Total Tk. 7,80,000.00

Total Taka Seven Lac Eighty Thousand Only.