Вы находитесь на странице: 1из 1

A B

250
2525
1
RB1 #12 -2 NOS TOP

3000
8#-@100 C/C
200 8#-@200 C/C
100
85

8#-@100 C/C
#12 -3 NOS BOT
2525
RB1 RB1 600

ELEVATION 150 THK P.C.C. 1:3:6


150 THK SAND FILLING TYP. DETAILS OF LINTEL WITH CHAJJA
SECTION OVER D &W
2900
A B RB1
W 2
2525
ROOF BEAM Description:-
1
PB1 1 THIS DRAWING SHOULD BE READ IN CONJUNCTION
WITH RELEVANT ARCHITECTURAL DRAWINGS,
2 ANY DISCREPANCY IN THE DRG. SHOULD BE BROUGHT
2900 TO THE KNOWLEDGE OF CONSULTANT BEFORE
400 EXECUTION
3. DRAWING IS NOT TO BE SCALED . ONLY WRITTEN
W 8-#10 DIMENSION SHOULD BE FOLLOWED .
X X
4. ALL DIMENSIONS ARE IN MM & LEVEL ARE IN METER
450 5. SBC CONSIDERED AS 12 T/METRE SQUARE AS PER SOIL
#8 @ 150MM C/C
REPORT AT A DEPTH OF 1.5 MTR FROM N.G.L .
PB1 2525 6. CLEAR COVER TO MAIN REINFORCEMENT SHALL BE
PB1 TYPICAL PEDESTAL SECTION FORCOLUMN 40MM & FOOTING 50MM,BEAM 25MM,SLAB
FOR C1 20MM
7. LOAD HAS BEEN TAKEN FOR GROUND FLOOR ONLY.
8. MINIMUM DEVELOPMENT OVER LAP FOR TOR STEEL
PLINTH BEAM TOP=100.60 SHALL BE 50d, WHERE "d" IS DIA OF MAIN REINFORCEMENT.
W THE LAP SHALL BE STAGGERED AND AVOIDED AT THE POINT
D OF MAXIMUM BENDING MOMENT
9- THE MIX FOR ALL R.C.C. WORK SHALL BE M25
F.G.L=100.00 10- Fe 500 CONFORMING TO IS-1786
11. SAND FILLING SHOULD BE DONE WITH COARSE SAND
PB1 IN ALL PIT PROPERLY COMPACTED BEFORE STARTING
OF ANY CONC. WORK.
2

PLINTH BEAM 1.5 No REVISION Date


A B 300 1 0 14/09/2020
q
2525 p

D
F1 F1
1 150 THK P.C.C. 1:3:6
300 THK SAND FILLING
C1 C1 SLOPE 45°
1.4

AUTHORITY :
COL. BAR SECTION A-A
LAP 1:6(MIN) (TYP)

EXECUTIVE ENGINEER PH DIVISION-1, CUTTACK

CLOSED TIE
TYP.HOOK DETAIL Client
DETAIL OF LAP SPLICE

Ly
OF STIRRUP
UNICORN CONSTRUCTION
2525

≥0.1L1 0.3L1 0.3L2


Lx
Project
DETAIL OF TYPICAL COLUMN FOOTING
≥0.5A #8@150mm C/C IMPROVEMENT OF WS TO CUTTACK NEW Z11 & HEAD
WORKS P1 (AMRUT/OD/CUTTACK/WS/34)
PLINTH BEAM 250X350
PLINTH BEAM TOP=100.60
F1 F1
2 125 Drawing
C1 C1 600
OUT HOUSE HOUSE (2.4X2.4 MT) AT WTP
L1
0.15L1 0.25L2
FG.L=100.00 250
Consultant
FOOTING & COLUMN PLAN 0.25L1 350 350
CONFIANCE INFRATECH MANAGEMENT PVT LTD
PLOT NO. 2093,3RD FLOOR ,RATH COMPLEX
#8@150mm C/C 500 150 JAYADEV VIHARBHUBANESWAR,751013
MOB.NO.9040044991,7978601153
150 THK P.C.C. 1:3:6 MAIL: info.confianceinfratech@gmail.com
150 THK SAND FILLING
700 Drawing Number CIM/D/492
250 250 250 250 FOUNDATION BELOW PLINTH
2-#16+1-#12 2-#16+1-#12 3-#12 3-#12 Date 14/09/2020
BEAM AT PERIPHERY WALL
Scale 1:1

#8@150 C/C #8@150 C/C #8@150 C/C #8@150 C/C


350 350 300
DETAILS OF COLUMN FOOTING DETAILS OF COLUMN REINFORCEMENT Sheet No. 01/01
SCHEDULE OF DOOR & WINDOW
FOOTING Lx Ly D p q
2-#16+1-#12 2-#16+1-#12 3-#12 3-#12
AT SUPPORT
DOOR D 2MX2.1M
AT CENTER AT SUPPORT AT CENTER F1 1.4M 1.4M 400mm #10@150mm C/C #10@150mm C/C WINDOW W 1.0MX1.2M C1 250X300 8#-@150 C-C
PLINTH BEAM(PB1) ROOF BEAM (RB 1)
12#-8NOS Designed By Contractor

Вам также может понравиться