Procedure :- The auxiliary earth spikes P and C were sticked into the
ground deeply. They have been aligned at an interval of 5-
10 m from the Inspection point tested. The green wire was
connected to the inspection point, the yellow wire to the
auxiliary spike P and the red wire to the auxiliary earth
spike C from terminals E, P and C of the instrument in
order.
Page 1 of 2
JG Solutions
Government Regd. Class-II Electrical Contractor
House No 84, Bhetapara Lalmati Road, Bhetapara, Guwahati-28
GSTIN No 18ALWPG2273Q2Z6, License No 6803
Mob No: 9864716474, Email: - jgsolutions.ghy@gmail.com
We certify that above earth resistance test values are true and correct.