INTEGRATED RISK ASSESSMENT REVIEW (IRAR) BG/TM/FRM-04/13 Last Reviewed Dated - Aug'19
(1) Excavation & back filling (b) OH & S MS,ITP,IRF,MIR,SAFETY AWARENESS RECORD
Sound 5 N Hearing impaired to oneself D 3 18.75 Yes
Use of Proper PPE & First Aid Kit in
Allergic Disease, eye irritation, 0.8
Dust particles 5 N D 3 place 18.75 Yes
breathing problem,
Sound 5 N Noise Pollution D 3 Working hours limited; Area isolated 18.75 Yes
0.8
Dust particles & Waste 5 N Pollution D 3 from public & proper waste disposal 18.75 Yes
(2) Wall Chasing / Core Cutting, Drilling. (b) OH & S MS,ITP,IRF,MIR,SAFETY AWARENESS RECORD
Sound 5 N Hearing impaired to oneself D 3 18.75 Yes
Use of Proper PPE & First Aid Kit in
Allergic Disease, eye irritation, 0.8
Dust particles 5 N D 3 place 18.75 Yes
breathing problem,
Wastage of materials 5 N Land Fill D 2 Proper House keeping & Waste Disposal 0.5 20.00 No
(3) Laying of pipes & Fittings for Drainage & Fresh (b) OH & S
MS,ITP,IRF,MIR,SAFETY AWARENESS RECORD
Water
PPE & first aid kit in place, Job rotation,
Improper Installation & Muscle Strain 5 N Physical Injury D 3 follow method of statement for 0.8 18.75 Yes
installation to proper effect
Wastage of materials 5 N Land Fill D 2 Proper House keeping & Waste Disposal 0.5 20.00 No
(4) Installation of Sanitary wares, Water pumps,
MS,ITP,IRF,MIR,SAFETY AWARENESS RECORD
Water heaters & Bathroom accessories
(b) OH & S
Muscle Strain 5 N Physical Injury D 3 PPE in place, first aid kit, Job rotation 0.8 18.75 Yes
(5) Testing & Commissioning of pipe line (b) OH & S MS,ITP,IRF,MIR,SAFETY AWARENESS RECORD
Muscle Strain 5 N Physical injury D 3 PPE is place, first aid kit, job rotation 0.8 18.75 Yes
Sound 5 N Noise Pollution D 3 Working hours limited; Area isolated 0.8 18.75 Yes
from public & proper waste disposal
Dust particles & Waste 5 N Pollution D 3 0.8 18.75 Yes
Sound 5 N Noise Pollution D 3 Working hours limited; Area isolated 0.8 18.75 Yes
Dust particles & Waste 5 N Pollution D 3 from public & proper waste disposal 0.8 18.75 Yes
(b) OH & S
(2) Excavation & Back Filling MS,ITP,IRF,MIR,SAFETY AWARENESS RECORD
Sound 5 N Hearing impaired to oneself D 3 0.8 18.75 Yes
Use of Proper PPE & First Aid Kit in
Allergic Disease, eye irritation, place
Dust particles 5 N D 3 0.8 18.75 Yes
breathing problem,
Wastage of materials 5 N Land Fill D 2 Proper House keeping & Waste Disposal 0.5 20.00 No
Wastage of materials 5 N Land Fill D 2 Proper House keeping & Waste Disposal 0.5 20.00 No
Wastage of materials 5 N Land Fill D 2 Proper House keeping & Waste Disposal 0.5 20.00 No
Wastage of materials 5 N Land Fill D 2 Proper House keeping & Waste Disposal 0.5 20.00 No
(7) Dressing / Termination of Wires & Cables (b) OH & S MS,ITP,IR,,SAFETY AWARENESS RECORD
Wastage of materials 5 N Land Fill D 2 Proper House keeping & Waste Disposal 0.5 20.00 No
Muscle strain 5 N Physical injury D 2 PPE is place, first aid kit,Job rotation 0.8 12.50 Yes
Wastage of materials 5 N Land Fill D 2 Proper House keeping & Waste Disposal 0.5 20.00 No
(b) OH & S
(9) Installtion of Fixture, Devices & Accessories like
MS,ITP,IRF,MIR,SAFETY AWARENESS RECORD
Lights, Sockets, & other ELV Devices Workmen entry with full PPE / Lifting &
Fall of Equipments 5 A Minor Injury D 2 installation method should follow as per 0.5 20.00 Yes
standards & procedure.
Muscle strain 5 N Physical injury D 2 PPE is place, first aid kit,Job rotation 0.8 12.50 Yes
(b) OH & S
Muscle Strain 5 N Physical injury D 2 PPE is place, first aid kit,Job rotation 0.8 12.50 Yes
HVAC SYSTEM
(a) Environmental Aspect
Sound 5 N Noise Pollution D 3 Working hours limited; Area isolated 0.8 18.75 Yes
Dust particles & Waste 5 N Pollution D 3 from public & proper waste disposal 0.8 18.75 Yes
(b) OH & S
(1) Wall Chasing / Core Cutting / Drilling Use of Proper PPE & First Aid Kit in MS,ITP,IRF,MIR,SAFETY AWARENESS RECORD
Sound 5 N Hearing impaired to oneself D 3 0.8 18.75 Yes
place
Allergic Disease, eye irritation, Use of Proper PPE & First Aid Kit in
Dust particles 5 N D 3 0.8 18.75 Yes
breathing problem, place
(b) OH & S
Use of Proper PPE & First Aid Kit in
Sound 5 N Hearing impaired to oneself D 3 0.8 18.75 Yes
place
Allergic Disease, eye irritation, Use of Proper PPE & First Aid Kit in
Dust particles 5 N D 3 0.8 18.75 Yes
breathing problem, place
Dust particles & Waste 5 N Pollution D 3 proper waste disposal 0.8 18.75 Yes
(4) PIPE & INSULATION MS,ITP,IRF,MIR,SAFETY AWARENESS RECORD
(b) OH & S
Allergic Disease, eye irritation, Use of Proper PPE & First Aid Kit in
Dust particles 5 N D 3 0.8 18.75 Yes
breathing problem, place
(5) Installtion of Air Distribution Products like Ducts, Wastage of materials / Scraps 5 N Land Fill D 3 Proper House keeping & Waste Disposal 0.8 18.75 No
MS,ITP,IRF,MIR,SAFETY AWARENESS RECORD
Dampers, Grills, VAV's, etc.
(b) OH & S
Muscle Strain 5 N Physical injury D 3 PPE is place, first aid kit, job rotation 0.8 18.75 Yes
Wastage of materials / Scraps 5 N Land Fill D 3 Proper House keeping & Waste Disposal 0.8 18.75 No
(b) OH & S
(6) Installation of Equipments like Chiller's, Package
MS,ITP,IRF,MIR,SAFETY AWARENESS RECORD
AC's, AHU's & FCU's & Ventilation Fans Workmen entry with full PPE / Lifting &
Fall of Equipments from Height 4 E Severe Injury D 5 installation method should follow as per 0.8 25.00 Yes
standards & procedure.
Muscle Strain 5 N Physical Injury D 3 PPE in place, first aid kit 0.8 18.75 Yes
Sound 5 N Noise Pollution D 3 Working hours limited; Area isolated 0.8 18.75 Yes
Dust particles & Waste 5 N Pollution D 3 from public & proper waste disposal 0.8 18.75 Yes
(b) OH & S
(1) Wall Chasing / Core Cutting / Drilling MS,ITP,IRF,MIR,SAFETY AWARENESS RECORD
Use of Proper PPE & First Aid Kit in
Sound 5 N Hearing impaired to oneself D 3 0.8 18.75 Yes
place
Allergic Disease, eye irritation, Use of Proper PPE & First Aid Kit in
Dust particles 5 N D 3 0.8 18.75 Yes
breathing problem, place
Dust particles & Waste 5 N Pollution D 3 proper waste disposal 0.8 18.75 Yes
(4) PIPES &FITTINGS INSTALATION MS,ITP,IRF,MIR,SAFETY AWARENESS RECORD
(b) OH & S
Allergic Disease, eye irritation, Use of Proper PPE & First Aid Kit in
Dust particles 5 N D 3 0.8 18.75 Yes
breathing problem, place
(5) Installtion of Fire Fighting Accessories like Hose Wastage of materials / Scraps 5 N Land Fill D 3 Proper House keeping & Waste Disposal 0.8 18.75 No
MS,ITP,IRF,MIR,SAFETY AWARENESS RECORD
Reels / cabinets, Extinguishers, Tanks, Sprinklers, etc
(b) OH & S
Muscle Strain 5 N Physical injury D 3 PPE is place, first aid kit, job rotation 0.8 18.75 Yes
Wastage of materials / Scraps 5 N Land Fill D 3 Proper House keeping & Waste Disposal 0.8 18.75 No
(b) OH & S
(6) Installation of Equipments like Pumps, etc MS,ITP,IRF,MIR,SAFETY AWARENESS RECORD
Workmen entry with full PPE / Lifting &
Fall of Equipments from Height 4 E Severe Injury D 5 installation method should follow as per 0.8 25.00 Yes
standards & procedure.
Muscle Strain 5 N Physical Injury D 3 PPE in place, first aid kit 0.8 18.75
Muscle Strain 5 N Physical injury D 3 PPE is place, first aid kit 0.8 18.75 Yes
(a) Consumption of paper 4 N Natural resource depletion D 2 Data electronic shared 0.8 10.00 No
Document Storage (a) Destroyal due to Any Accidents 1 E Resulting into fire & injury D 3 Fire alarms system in place 0.8 3.75 Yes
Score Table
Likelyhood: (L) Severity: (S) Control: (C)
Emission Air Pollution Slip/ Trip Hazards Minor Injury L: LIKLEYHOOD Of Occurance
EXTREME > 80
YTHING ABOVE "20" IS NOT A ACCEPTABLE
RISK
SCORES, NOW CATEGORISE THEM USING THE THE FOLLOWING
BANDS
No action Reqd
No action reqd but maintain and monitor controls