Академический Документы
Профессиональный Документы
Культура Документы
11200 11200
300
2000
2000
1.70
75
1 F1C1 F1C1 1 T1 16-mm thk. baseplate
8000
FIREWALL
FIREWALL
5 DETAIL 2
4 DETAIL 1
19500
19500
2 F1C1 F1C1
2 T1
S 1 SCALE 1:20 S 1 SCALE 1:20
7350
150mmØ G.I pipe
sched.40 steel post
300
16 mm thk. Stiffeners
16 mm thk. BASEPLATE
3 F1C1 F1C1
3 T1
2150
2150
2L - 2 21" x 2 21" x 16
3
" ANGLE BAR TOP OF PEDESTAL
(Top & Bot. Chord) 4-16mmØ def.bar vertical w/ 2 sets - 10mmØ LATERAL TIES
spaced 5 @ 50;5@ 100; rest @ 200 O.C from support
1500
(Web Members)
810
NATURAL GROUND LINE
300
300
2" Ø G.I. PIPE @ 600
2 21" Ø G.I. PIPE
1200
0.65m O.C (WEB) 45mm concrete covering
7650
100
S 1 SCALE 1:100 6 DETAIL 3
S 1 SCALE 1:20