Revision No. : 1 Page No. : 1 of 3
Quantity of Work done Total no. of Test upto (Previous Total no. of Test (Current
Total no. of Test (Cumulative)
( SQM / Cum) month) month-September-2020)
Requirement as per MORT&H
In Percentage No. of Test conducted by AE In Percentage No. of Test conducted by AE
Sr. No Description of Test
(Cumulative) ( current Month-September-2020)
Remarks
(Clause 900)
Conducted
Conducted
Conducted
Passed
Passed
Passed
Up to Previous Updated Quantity
Failed
Failed
Failed
During this Month
Month Till Date
2 Embankment
1 set / 3000 sqm
a Compaction Control Test (FDD) 674595.6 0 674595.6 5262 135 4487 0 0 0 5262 135 4487 1800 34
(10 test)
3 Sub Grade
a Grain size analysis 1 test /1500 cum 672598 123 672721 466 466 1 0 1 467 0 467 134 28.69 1 100
b Atterberg Limits (LL & PL) 1 test /1500 cum 662390 123 662513 466 466 1 0 1 467 0 467 134 28.69 1 100
c Proctor Test (MDD & OMC) 1 test /1500 cum 662390 123 662513 466 466 1 0 1 467 0 467 134 28.69 1 100
d Free Swelling Index 1 test /1500 cum 662390 123 662513 466 466 1 0 1 467 0 467 134 28.69 1 100
e C. B. R. Test 1 test / 3000 cum 662390 123 662513 161 161 1 0 1 162 0 162 50 30.86 1 100
b Atterberg Limits (LL & PL) 1 test / 400 cum 122472 724.5 123197 271 0 271 1 0 1 272 0 272 126 47 1 100 Test conducted for Design Trial Mix
11 Structural Concrete
b Water absorption As required 2 2 0 0 0 2 0 2 2 100 0 0 Test conducted for Design Trial Mix
e Soundness As required 1 1 0 0 0 1 0 1
e Soundness As required 1 1 0 0
f Alkali aggregate reactivity test As required 1 1 0 0
B. Cement
a Fineness 68 68 4 4 72 72 53 136 2 50
b Consistancy 68 68 4 4 72 72 53 136 2 50
C. 1 set per 1-5 cum, 2 set per 6-15 cum, 3 set per 16-30 cum, 4 set per 31-50 cum,
Strength of Concrete (Structural)
51 cum and above 4 set plus 1 set per every 50 cum
7 days 1104 25 1079 27 0 27 1131 25 1106 687 61 14 52
a M 15 PCC 4384.48 68.33 4452.81
28 days 1963 23 1940 36 0 36 1999 23 1976 966 48 20 180
7 days 83 83 9 0 9 92 0 92 44 42 2 50
b M 20 PCC 1018.26 40.34 977.92
28 days 309 309 15 15 324 324 133 244 6 50
7 days 39 2 39 0 0 0 39 2 39 28 72 0
c M 25 RCC 989.09 989.09
28 days 99 3 99 0 0 0 99 3 99 80 81 0
7 days
d M 30 RCC 0 0 0
28 days
7 days
f M-20 kerb 0 0 0
28 days
7 days 9 9 0 0 9 9 36 400 30
g M 40 RCC 278.87 0 278.87
28 days 39 39 0 0 39 39 86 221 55
C. Strength of Concrete (PQC) 1 set per 150 cum, 150 cum and above 1 set plus 1 set per every 150 cum (Minimum 2 sets per day)
C. Strength of Concrete (DLC) 1 set per 1000 Sqm per 3 cubes (Minimum 2 sets per day)
a Dimension Tolerance 10 10 10 10
b Straightness 10 10 10 10
1 test per lot (As per IS:458 &
c Permeability IS :3597) 10 10 10 10
e Admixture 1 0 1 1 0 1
f Water 2 0 2 0 0 2 0 2
Coarse 2 0 2 0 0 2 0 2
g Aggregate
Fine 2 0 2 0 0 2 0 2
h Soil 1 0 1 1 0 1
14 Calibration
100 mm Dia once in 3 Months 10 0 10 0 0 10 0 10 7 67 0 0
Sand pouring 150 mm Dia once in 3 Months 10 0 10 0 0 10 0 10 7 67 0 0
a
cylinder
200 mm Dia once in 3 Months 10 0 10 0 0 10 0 10 7 67 0 0