MONTHLY PROGRESS REPORT

Rehabilitation and upgradation of existing carriageway to two lanes with paved shoulder standards from Kundral to Wazar section of NH -161A from km 52.730
to km 99.250 in the State of Maharashtra
Revision No. : 1 Page No. : 1 of 3

Summary of Quality Control Test Conducted till Month of September - 2020

Quantity of Work done Total no. of Test upto (Previous Total no. of Test (Current
Total no. of Test (Cumulative)
( SQM / Cum) month) month-September-2020)
Requirement as per MORT&H
In Percentage No. of Test conducted by AE In Percentage No. of Test conducted by AE
Sr. No Description of Test
(Cumulative) ( current Month-September-2020)
Remarks
(Clause 900)

Conducted

Conducted

Conducted
Passed

Passed

Passed
Up to Previous Updated Quantity

Failed

Failed

Failed
During this Month
Month Till Date

1 OGL/Existing Shoulder No Of Test in Percentage No of Test In Percentage

a Grain size analysis 176 0 176 176 0 176 88 25


b Atterberg Limits (LL & PL) 176 0 176 176 0 176 88 25

c Proctor Test (MDD & OMC) 176 0 176 176 0 176 88 25

d Free Swelling Index 176 72 104 176 72 104 88 25


e C. B. R. Test 61 0 61 61 0 61 17 28 CBR < 8 %

g Compaction Control Test (FDD) 905 46 859 905 46 859 309 36

2 Embankment
1 set / 3000 sqm
a Compaction Control Test (FDD) 674595.6 0 674595.6 5262 135 4487 0 0 0 5262 135 4487 1800 34
(10 test)
3 Sub Grade

a Grain size analysis 1 test /1500 cum 672598 123 672721 466 466 1 0 1 467 0 467 134 28.69 1 100
b Atterberg Limits (LL & PL) 1 test /1500 cum 662390 123 662513 466 466 1 0 1 467 0 467 134 28.69 1 100

c Proctor Test (MDD & OMC) 1 test /1500 cum 662390 123 662513 466 466 1 0 1 467 0 467 134 28.69 1 100
d Free Swelling Index 1 test /1500 cum 662390 123 662513 466 466 1 0 1 467 0 467 134 28.69 1 100
e C. B. R. Test 1 test / 3000 cum 662390 123 662513 161 161 1 0 1 162 0 162 50 30.86 1 100

1 set / 2000 sqm.


f Compaction Control Test (FDD) 998533 820 999353 9185 166 9019 40 0 40 9225 166 9059 4130 45 20 50
(10 test)

4 Granular Sub Base


a Gradation 1 test / 400 cum 122472 724.5 123197 288 22 266 6 0 6 294 22 272 131 51 4 67

b Atterberg Limits (LL & PL) 1 test / 400 cum 122472 724.5 123197 271 0 271 1 0 1 272 0 272 126 47 1 100 Test conducted for Design Trial Mix

c Proctor Test (MDD & OMC) As required 4 0 4 0 0 0 4 0 4 4 100 0 0


d C. B. R. Test As required 4 ` 4 0 0 0 4 0 4 4 100 0 0

e Aggregate Impact Value (AIV) As required 21 21 0 0 0 21 0 21 18 86 0 0

f Deleterious content As required 0


g Density for compacted layer(sets) 1test / 1000 sqm 681814.3 4078 685892.3 914 42 872 24 0 24 938 42 760 351 37 10 42

11 Structural Concrete

A. Quality of Coarse and fine Aggregate


a Gradation 1 test / day 633 28 605 4 0 4 637 28 609 342 186 2 50

b Water absorption As required 3 0 3 0 0 0 3 0 3 3 100 0 0

c Aggregate Impact Value (AIV) Once in a Week 98 0 98 4 0 4 102 0 102 42 243 2 50


d Flakiness Index (FI) Once in a Week 94 0 94 4 0 4 98 0 98 42 233 2 50

e Soundness As required 1 1 1 1 1 100

f Alkali aggregate reactivity test As required 1 1 1 1 1 100

12 Dry lean concrete (DLC)

A Quality of Coarse and fine Aggregate

a Gradation 1 test / day 334 12 322 6 0 6 340 12 328 112 33 3 50

b Water absorption As required 2 2 0 0 0 2 0 2 2 100 0 0 Test conducted for Design Trial Mix

c Aggregate Impact Value (AIV) Once in a Month 20 0 20 1 0 1 21 0 21 17 81 1 100

d Flakiness Index (FI & EI) Once in a Month 19 0 19 1 0 1 20 0 20 17 85 1 100

e Soundness As required 1 1 0 0 0 1 0 1

f Alkali aggregate reactivity test As required 1 1 0 0 0 1 0 1

13 Pavement Quality Comcrete (PQC)

A Quality of Coarse and fine Aggregate

a Gradation 1 test / day 267 0 267 6 0 6 273 0 273 112 41 4 67

b Water absorption As required 2 2 2 2 1 50 Test conducted for Design Trial Mix

c Aggregate Impact Value (AIV) Once in a Month 20 20 1 1 21 20 18 86 1 100

d Flakiness Index (FI & EI) Once in a Month 20 20 1 1 21 20 18 86 1 100

e Soundness As required 1 1 0 0
f Alkali aggregate reactivity test As required 1 1 0 0

B. Cement

a Fineness 68 68 4 4 72 72 53 136 2 50
b Consistancy 68 68 4 4 72 72 53 136 2 50

c Initial and Final Setting time 1 test / consignment 68 68 4 4 72 72 53 136 2 50

d Compressive Strength cubes 68 68 4 4 72 72 53 136 2 50


e Specific Gravity 68 68 4 4 72 72 53 136 2 50

C. 1 set per 1-5 cum, 2 set per 6-15 cum, 3 set per 16-30 cum, 4 set per 31-50 cum,
Strength of Concrete (Structural)
51 cum and above 4 set plus 1 set per every 50 cum
7 days 1104 25 1079 27 0 27 1131 25 1106 687 61 14 52
a M 15 PCC 4384.48 68.33 4452.81
28 days 1963 23 1940 36 0 36 1999 23 1976 966 48 20 180

7 days 83 83 9 0 9 92 0 92 44 42 2 50
b M 20 PCC 1018.26 40.34 977.92
28 days 309 309 15 15 324 324 133 244 6 50

7 days 39 2 39 0 0 0 39 2 39 28 72 0
c M 25 RCC 989.09 989.09
28 days 99 3 99 0 0 0 99 3 99 80 81 0
7 days
d M 30 RCC 0 0 0
28 days

7 days 1339 8 1331 0 0 0 1339 8 1331 500 37 3


e M 35 RCC 11748.77 0 11748.77
28 days 2731 7 2724 0 0 0 2731 7 2724 1230 45 16

7 days
f M-20 kerb 0 0 0
28 days

7 days 9 9 0 0 9 9 36 400 30
g M 40 RCC 278.87 0 278.87
28 days 39 39 0 0 39 39 86 221 55
C. Strength of Concrete (PQC) 1 set per 150 cum, 150 cum and above 1 set plus 1 set per every 150 cum (Minimum 2 sets per day)

7 days 590 7 583 18 0 18 608 7 601 692 114 5 28


a M 40 (PQC)
28 days 1625 10 1615 21 0 21 1646 10 1636 688 42 7 33
991571.8 767.25 992339.05 Test conducted for Design Trial Mix
M 40 (PQC) 7 days 608 13 595 18 0 21 626 13 616 692 111 5 28
b
(Beams) 28 days 1559 12 1547 21 0 21 1580 12 1513 668 42 8 38

C. Strength of Concrete (DLC) 1 set per 1000 Sqm per 3 cubes (Minimum 2 sets per day)

a M 10 (DLC) 7 days 2533 53 2480 54 0 54 2587 53 2534 914 35 36 67

376725.6 2792 379517.6 Test conducted for Design Trial Mix


Compaction Control
a 2000 sqm / 3 holes 1008 19 989 24 0 24 1032 19 1013 356 34 15 63
Test (FDD)

Hume Pipes (NP4)

a Dimension Tolerance 10 10 10 10

b Straightness 10 10 10 10
1 test per lot (As per IS:458 &
c Permeability IS :3597) 10 10 10 10

d Three edge bearing 10 10 10 10

13 Third Party Testing


a Cement (OPC 43 & 53 Grade) 3 0 3 0 0 3 0 3

b Steel (Fe 500) 1 0 1 1 0 1

e Admixture 1 0 1 1 0 1
f Water 2 0 2 0 0 2 0 2

Coarse 2 0 2 0 0 2 0 2
g Aggregate
Fine 2 0 2 0 0 2 0 2
h Soil 1 0 1 1 0 1

14 Calibration
100 mm Dia once in 3 Months 10 0 10 0 0 10 0 10 7 67 0 0
Sand pouring 150 mm Dia once in 3 Months 10 0 10 0 0 10 0 10 7 67 0 0
a
cylinder
200 mm Dia once in 3 Months 10 0 10 0 0 10 0 10 7 67 0 0

b Rapid Moisture Meter once in Three Months 7 0 7 0 0 7 7 5 71 0 0

c B.Plant once in six Month 3 0 3 3 0 3 3 100 0 0


EPC Contractor's Representative Authorioty Engineer's Representative
MONTHLY PROGRESS REPORT

Rehabilitation and upgradation of existing carriageway to two lanes with paved


shoulder standards from Kundral to Wazar section of NH -161A from km 52.730 to km
99.250 in the State of Maharashtra Date 01/09/2020
Revision No. : 1 Page No. : 1 of 1

WEATHER REPORT FOR THE MONTH OF September- 2020


Cumm.
S.N Temperature Humidity Rainfall Weather
Date Rainfall
o
Max Min Max Min (mm) (mm) Condition

1 1-Sep-20 38.2 24.4 81 42 0 1034 Clowdy

2 2-Sep-20 35.0 23.5 92 51 4 1038 Clowdy

3 3-Sep-20 35.4 24.8 80 50 0 1038 Clowdy-sunny

4 4-Sep-20 38.5 23.9 83 42 0 1038 Clowdy-sunny

5 5-Sep-20 38.4 24.8 80 42 0 1038 Clowdy-sunny

6 6-Sep-20 37.4 25.4 84 43 0 1038 Clowdy-sunny

7 7-Sep-20 38.9 24.0 77 42 0 1038 Clowdy-sunny

8 8-Sep-20 40.0 24.8 78 40 0 1038 Clowdy-sunny

9 9-Sep-20 38.1 25.3 80 43 0 1038 Clowdy

10 10-Sep-20 31.9 24.4 91 54 10 1048 Clowdy

11 11-Sep-20 37.0 24.1 89 52 0 1048 Clowdy

12 12-Sep-20 33.8 25.3 90 50 27 1075 Clowdy

13 13-Sep-20 31.1 23.3 88 67 3 1078 Clowdy

14 14-Sep-20 31.1 23.5 93 70 43 1121 Clowdy

15 15-Sep-20 30.7 22.0 96 75 138 1259 Clowdy

16 16-Sep-20 32.3 24.3 95 76 11 1270 Clowdy

17 17-Sep-20 29.9 30.5 91 41 112 1382 Clowdy

18 18-Sep-20 33.4 23.0 96 72 29 1411 Clowdy

19 19-Sep-20 34.1 23.4 96 64 2 1413 Clowdy

20 20-Sep-20 36.0 22.8 95 55 13 1426 Clowdy

21 21-Sep-20 36.0 22.4 90 50 95 1521 Clowdy-sunny

22 22-Sep-20 34.1 22.4 92 62 100 1621 Clowdy

23 23-Sep-20 34.9 22.0 94 57 0 1621 Clowdy

24 24-Sep-20 34.1 24.3 90 65 6 1627 Sunny

25 25-Sep-20 33.9 23.0 92 68 82 1709 Sunny

26 26-Sep-20 26.0 21.9 96 86 8 1717 Sunny

27 27-Sep-20 26.0 23.0 90 86 0 1717 Sunny

28 28-Sep-20 36.3 22.4 88 46 0 1717 Sunny

29 29-Sep-20 36.4 24.8 90 56 0 1717 Sunny

30 30-Sep-20 35.0 23.1 84 44 56 1773 Sunny


EPC Contractor's Representative Authorioty Engineer's Representative