Академический Документы
Профессиональный Документы
Культура Документы
New Version
Of This
Material Will
Coming Soon
Integration of FI with MM
Step 1: Define / Create Plant
Name =
Country = Click on “Enter”
Clikc on “position”
Purchase organization = click on “enter”
Company code = click on “save”
Click on “Copy”
From Plant = 0001
To Plant = Click on “Copy” and Enter.
Note: T.Code OMSY is used for opening Posting period for the first time only. For
subsequent opening / closing of posting periods, we need to use T.Code MMPV.
Path: SPRO – Material Management – Purchasing – Purchase order – Set tolerance limit
for price variance
Select and Copy “PE” and “SE” tolerance groups of Co.Cd. 0001 to your Company
Code.
Copy “B1”, “B2” and “VP” Tolerance groups of Co. Cd. 1000 to your Co. Cd.
Step 14: Maintain Plant Parameters for Inventory management & physical inventory
Copy Co.Cd. 0001 settings to our Co.Cd. and Enter Tax Code = V0.
Click on “Position”,
Copy “AN” & “ST” of 1000 Co. Code to your Co. Code
Path: SAP Easy Access – Logistics – Material Management – Purchasing – Master data
– Vendor – Centrally – Create T.Code XK01
Company Code =
Account Group =
Purchasing Organization = Click Enter
Title = Company
Name =
Country =
Material =
Industry =
Material type = Click on “Select Views”,
Faculty: M.Upendar Reddy, I.C.W.A.I and Sap Fi/Co Consultant
Pedant Softech Pvt Ltd 9246212199 Page 5
SAP FI/CO Integration of FI with MM
Basic Data 1
MRP 1
Purchasing
Accounting 1
Costing 1
Costing 2
Material =
Base unit =
Material Group = Click on Enter
Valuation class =
Moving price = Click on Enter
Create Number ranges for the following Document types with respective Serial Numbers.
Or
Plant =
Storage Location =
Go to Org. Data tab
Purchase Organization=
Purchase Group =
Company Code =
Path: SAP Easy Access – Logistics – Material Management – Inv. Management – Goods
Movement – GR for PO
Scroll down and Select “Item OK” and Click on “Check” button on the tool bar.
Invoice date =
Amount =
Go to Payment tab,
Baseline date =
In PO Reference tab,
Enter PO Document Number Click Enter
Movement type =
Plant =
Storage Location =
Click on “Enter”
G/L Account =
CostCenter =
Material =
Quantity =
Storage Location =
Prerequisites:
Select the procedure line “ ITAX ” and double click “Control Data”
Click on “New Entries”
Step Condition Type Description From To Account Key
1 BASB Base Amount
2 MWVS Input Tax 1 1 VST
3 MWAS Output Tax 1 1 MWS Save
Number = 100510
A/c Group = Current Liabilities
Text = Tax Payable
A/c Currency = INR
Select “Open item management”
Select “ Line Item Display”
Sort Key = 001
Field Status Group = G001 Click on Save