Vinayagamoorthy M.
Senior Technical Manager, Midas
Midas IT, Mumbai, Maharashtra, India,
ABSTRACT
There are various means and methods available in the construction industry for
the erection of bridges. The Cantilever Method is the most widely used erection
method for the construction of the cable stayed bridges.
bridges. For this type of structural
analysis, the geometrical and boundary changes as well as the material properties
changes must be considered. However, considerable stresses are produced due to the
construction loads in the continuous structure. To determine
determine the cable installation
forces, the initial equilibrium state for dead load at the final stage must be determined
first. However, in order to obtain the desired cable force which satisfies the suitable
range of displacement and member forces, the engineers
engineers need to go through the
numerous trial & error procedures. To find the cable pretension loads, the unit load
method is used in this study. For verification, the Finite Element software (Midas
Civil) is used to determine the cable forces using the function
function Unknown Load Factor.
Also the construction stage analysis for the cable stayed bridge is explained using
software. Various parameters are influenced on the cable forces as well as pylon
forces. These are back span to main span ratio,
ratio pylon height to deck span ratio, Pylon
Geometry, Cable system arrangements are varied, results are validated and all the
details are given in this paper.
Key words: Cable forces, Unknown Load Factor, Construction stage Analysis
http://www.iaeme.com/IJCIET/index.
IJCIET/index.asp 252 editor@iaeme.com
Prataprao Jadha V., G. Mohan Ganesh and Vinayagamoorthy M,
Cite this Article: Prataprao Jadha V., G. Mohan Ganesh and Vinayagamoorthy M,
Erection Stage Dynamic Behavior of Cable Stayed Bridge Using Construction Stage
Analysis, International Journal of Civil Engineering and Technology, 8(4), 2017, pp.
252–264.
http://www.iaeme.com/IJCIET/issues.asp?JType=IJCIET&VType=8&IType=3
INTRODUCTION
A cable stayed bridge is a type of bridge whose deck superstructure is supported by multiple
cables that run down to the main girder from one or more towers. The cable stayed bridges
are specially suited in the span range of 100 to 1000 m and thus provides a transition between
the continuous box girder bridges and the stiffened suspension bridges. It was developed in
Germany in the post war years in an effort to save steel which was then in short supply. Since
then many cable stayed bridges have been built all over the world. The cable stayed bridges
are economical over a wide range of span lengths and they are aesthetically attractive. The
wide application of the cable stayed bridge has been greatly facilitated in recent years by the
availability of high strength steels, the adoption of orthotropic decks using advanced welding
techniques and the use of electronic computers in conjunction with rigorous structural
analysis of highly indeterminate structures. The beauty and visibility of a cable stayed bridges
are mainly constructed using steel for stay cables, deck and towers. In some of the recent
constructions, the deck and towers has been constructed in structural concrete or a
combination of steel and concrete.
The cables are prestressed by introducing additional tensile force in the cables in order to
improve the stress in the main girder and tower at the completion stage, to prevent the
lowering of rigidity due to sagging of cable, and to optimize the cable condition for the
erection. The magnitude of the prestress is determined by taking into consideration the factors
such as the horizontal components of each cable tension is balanced such that there is no in-
plane bending of the tower due to unbalanced horizontal force due to dead load at the
completion stage, and the net force on the main girder at the connection of the cable at the
completion stage be assumed to be in certain limit.
The major issue of the design and erection of the cable-stayed bridges are to determine
and achieve the initial equilibrium configuration at the completed state. The initial
equilibrium configuration in case of cable-stayed bridges is the equilibrium condition due to
combined effect of dead load and tension forces in the stay cables.
There are various methods to determine the cable forces; these are classified as below;
1. Traditional "Zero Displacement" method
2. Force Equilibrium method
3. Force method
4. Unit Load method
In “Traditional Zero Displacement Method”, it is assumed as roller support at the cable
anchorage location of deck without cable and determines cable forces referring to the reaction
which is vertical component of cable force. Major concept of design is reducing bending
moment in tower and girders due to dead load.
In “Force Equilibrium Method”, it is assumed that all the cable support and tower
connection as fixed supports. The target bending moment distribution is obtained. The
condition is arrived as there would be zero moment in the pylon. In this case, nonlinearity due
to cable sag effect is ignored and pretension of cable at each end is assumed to be identical.
Force Equilibrium method considers the effect of this horizontal force.
In “force method”, we can assume the member force by converting the structure as
determinate structure. Using the member forces due to live loads, member forces due to dead
loads can be obtained.
In “Unit Load Method”, to determine the unknown forces in each stay cables and to
achieve the ideal state, a unit pretension load is applied in each cable. By performing a linear
analysis, the influence on the structure due to each unit tension load is determined. In the
Unknown Load method, the unit load cases are created as a pretension Load. The structural
constraints e.g. moment or displacement values, which are to be realized through the load
factors in the combined load case, must be defined (Figure.1.1).
2. LITERATURE REVIEW
Camara had proposed the parametric analysis for main span length, cable system
arrangement, tower geometry, the height and width of deck as well as soil conditions. After
that author suggested the contribution of transverse modes of vibration to the seismic
response, which is strongly influenced by the main span length. Also he suggested as more
the inclined legs above the deck, the larger will be transverse stiffness of tower.
Fabbrocino had attempted for calculating the optimal prestress design for composite cable
stayed bridges. First a target bending moment distribution over longitudinal beam was
identified and further Algorithm for the computation of optimal pre-tension forces had been
formulated.
Xudong Shao discussed about a new cable stayed bridge type named as partial ground
anchored cable stayed bridge with crossing stay cables. He concluded that as the pylon height
to span length ratio is reduced the horizontal pressure in main girder also the cost reduced to
11.8% than suspension bridge. Also the size of ground anchors reduced by 30% than
suspension bridge.
Yutaka Okamoto carried out research on steel double box section filled with the concrete.
He proposed that filled concrete increases the strength because of confined effect and steel
plates increases the resistance against local buckling because of the deformation resisted by in
filled concrete. The towers with three different heights are also studied and how it will affects
deformation and bending moment are classified.
3. OBJECTIVES
Based on the above literatures a number of initial studies are conducted to ensure the
accuracy and suitability of the modelling and following objectives are formulated for this
paper.
(1) Modeling of cable stayed bridge for initial pretension and carry out analysis using 3D
Finite Element Software (Midas Civil)
(2) Optimize the behavior of the cable stayed bridge under unit load method
(3) To arrive at maximum dynamic response of the bridge for the optimum pretension load
and determine cable forces
(4) Verification of results with analytical method.
(5) Carry out the construction stage analysis and determine the optimum cable forces in each
stage
4. WORK METHODOLOGY
To arrive the above objectives following stepwise methodology is adopted (Figure.4.1).
Defining Scope of work
Data consideration
Analysis
Numerical Analysis
Conclusion
5. MODEL STUDY
The following modelling data is used for the calculations of example model. A simple 2D
Cable stayed model is chosen to clarify main considerations in modelling and to determine
the cable forces. Figure.5.1 shows a schematic representation of the cable stayed bridge. The
structure is modelled using the following data considerations (Refer Table 5.1 to Table5.3).
Classification Cross
Cross-section Area (m2) Moment of Inertia(m4)
Deck 0.0225 7.11 e-5
Pylon Top 0.04 2.25 e-4
Pylon Bottom 0.07 5.184 e-44
Cable 3.15 e-4 1.57 e-8
Table 5.3.
5.3 Loading data of the model
4.5m
A B C D
5m 5m 3m
http://www.iaeme.com/IJCIET/index.
IJCIET/index.asp 256 editor@iaeme.com
Prataprao Jadha V., G. Mohan Ganesh and Vinayagamoorthy M,
Self
Self-Weight Pretension 1 Pretension 2
Node No
Dx DZ Dx Dz Dx Dz
17 0.025 -0.214 -0.005 -0.06 0.001 0.069
19 -0.001
0.001 -0.201 0 0.049 0.001 0.033
22 0.001 -0.201 -0.001 0.033 0 0.049
2 -0.025
0.025 -0.214 -0.001 0.069 0.005 -0.06
(Continue)
http://www.iaeme.com/IJCIET/index.
IJCIET/index.asp 257 editor@iaeme.com
Erection Stage Dynamic Behaviour of Cable Stayed Bridge Using Construction Stage Analysis
http://www.iaeme.com/IJCIET/index.
IJCIET/index.asp 259 editor@iaeme.com
Erection Stage Dynamic Behaviour of Cable Stayed Bridge Using Construction Stage Analysis
Stage 1 Tower Installation Stage 2 Install 1st segment Stage 3 Pretension 1st set of
cables
8. RESULTS INTERPRETATION
The parameters used for studying construction stage analysis are Displacement contour,
bending moment diagram, reactions at supports, unknown load factors.
Ratio
$%
&'
0.25 0.33 0.5
http://www.iaeme.com/IJCIET/index.
IJCIET/index.asp 262 editor@iaeme.com
Prataprao Jadha V., G. Mohan Ganesh and Vinayagamoorthy M,
Main Span(m) 15 15 15 15 15 15
Ratio
)*+,- ./0123
450- %65-
0.2 0.266 0.333 0.4 0.466 0.5
From Table 7.3 it is observed that, as the ratio of height of pylon to main span increases,
the pylon compressive forces as well as cable forces are reduces apparently .But compared to
the pylon forces there is considerable decrease in cable forces for the same material and
geometrical properties.
8. CONCLUSION
After the examination of the construction stage analysis, the given model shows the
importance of the consideration of changing configuration at each stage. Here, the activation
to a deformed or undeformed deck and the cables will lead to a wrong estimation of cable
forces. The ideal cable forces are determined to achieve an optimal structural performance
due to its permanent loads. For the construction stage analysis, 17 various stages are modelled
using Finite Element Software so that they allow to include each erection stage.
Most of the calculated cable forces are equal to the final forces of the compared data with
the software. In the performed analysis, the initial stressing of the cables is applied in terms of
pretension load which is not a basic parameter. Therefore, the construction loads must be
accurately define to obtain the initial cable forces. The model does not include any geometric
as well as material non-linearity in the analysis of construction stage. A final calculation
should be done to consider these effects into account as they may optimize the cable forces.
Complete understanding of a structure is necessary to use the above optimization
techniques for finding design variables. The parameters like back span to main span ratio,
pylon height to deck span ratio, pylon geometry, cable system arrangements are compared
and results are drawn as bridge with back span to main span ratio lies between 0.25 and 0.5,
the height of pylon lies between L/8 to L/15, the inverted ‘Y’-shaped towers and diamond
configuration are less effective in load transfer than two plane tower.
ACKNOWLEDGEMENT
The authors wish to thank the supports provided by the VIT University Vellore. Also they
would like to special thank to the entire team from Midas IT, R&D, Mumbai, Maharashtra for
their valuable support.
REFERENCES
[1] A.Camara, E. Efthymiou,Deck–tower interaction in the transverse seismic response of
cable-stayed bridges and optimum configurations, Engineering Structures, 124, (2016)
494–506
[2] F. Fabbrocino, M. Modano, I. Farina, G. Carpentieri, F. Fraternali, Optimal prestress
design of composite cable-stayed bridges, Journal of Composite Structures, (2016),1-6
[3] Xudong Shao,Jia Hu, Lu Deng,and Junhui, Conceptual Design of Superspan Partial
Ground-Anchored Cable-Stayed Bridge with Crossing Stay Cables, Journal of Bridge
Engineering, 1, (2014),11-15
[4] Yutaka Okamoto,Shunichi Nakamura, Static and seismic studies on steel/concrete hybrid
towers for multi-span cable-stayed bridges, Journal of Constructional Steel Research,67,
(2011), 203–210
[5] M.Vinayagamoorthy, Dr. G. Mohan Ganesh, Dr. A.S. Santhi, Secondary analysis for Pile
foundation by P-∆ Method, International Journal of Applied Engineering Research,11,
(2016),1579-1582
[6] D.Johnson Victor, Essentials of Bridge Engineering, Oxford and IBH Publications, Sixth
Edition, (2007)
[7] N. Krishna Raju, Design of Bridges, Third Edition, (2007)
[8] IRC: 6-2014, Code of Practice for Concrete Road Bridges, (2011)
[9] Midas Civil Help and Analysis Manual
[10] Suhas S Vokunnaya, Ravindranatha and Tanaji.Thite, Construction Stage Analysis of
Segmental Cantilever Bridge. International Journal of Civil Engineering and Technology,
8(2), 2017, pp. 373–382.
[11] G. M. Savaliya, Prof. (Dr.) A. K. Desai and Prof.(Dr.) S. A. Vasanwala. The Effect of
Lateral Configuration on Static and Dynamic Behaviour of Long Span Cable Supported
Bridges, International Journal of Civil Engineering and Technology, 6(11), 2015, pp. 156-
163. G. M. Savaliya, Prof. (Dr.) A. K. Desai and Prof.(Dr.) S. A. Vasanwala. The Effect
of Lateral Configuration on Static and Dynamic Behaviour of Long Span Cable
Supported Bridges, International Journal of Civil Engineering and Technology, 6(11),
2015, pp. 156-163.
[12] K.V. Ramana Reddy,(2014), Aerodynamic Stability of A Cable Stayed Bridge,
International Journal of Civil Engineering and Technology, 5(5), pp. 88-96.