Академический Документы
Профессиональный Документы
Культура Документы
References:
Ref 1 Muir Wood, A. M. (1975) The circular tunnel in elastic ground, Geotechnique 25, No. 1, 115 - 127
Ref 2 Curtis, D. J. (1976) Discussion on the reference above, Geotechnique 26, No. 1, 231 - 237
Ref 3 Duddeck, H., Erdmann, J. (1982) Structural design models for tunnels,
Ref 4 Tunnelling 82, International
Outline Design SpecificationSymposium organised
: Metro Link by Institution
Express for Gandhinagarof Mining & Metallurgy
and Ahmedabad
Ref 5 Package-UG-1
Notations
Symbol Description
C = Cover to tunnel crown
Zo = Depth to tunnel axis
D = Excavated tunnel diameter
r0 = Radius to extrados of tunnel lining
g = Average unit weight of overburden
k = Constant
E = E Young's modulus for lining ( replaced by E/(1-v 12) ,Where lining continuous along tunnel)
Ec, v = Young's modulus and Poisson's ratio of ground
I = Second moment of initia of lining per unit length of tunnel
Ie = Effective value of I for a jointed lining
Ij = Effective value of I at joint in a lining
M = Bending moment in lining per unit length of tunnel
N = Hoop (circumferential) thrust in lining per unit length of tunnel
h = Ratio of radius of lining centroid to that of extrados
Umax = Maximum radial movement of lining
hw = Water table from ground surface
Additional Distorsion
ULS SLS [Crack Width] SLS (Deflection] ULS (Distor] SLS (Distor]
Load Combination 1 2 3 4 5 6 7 8 9 10 11 12 13 14
1.5 1.5 1.5 1.5 1.5 1 1 1 1 1 1 1 1.5 1
Load factor for OverBurden Load
Load Factor for Surcharge 1.5 1.5 1.5 1.5 1.5 1 1 1 1 1 1 1 1.5 1
Load Factor for Water 1.5 1.5 1.5 1.5 1.5 1 1 1 1 1 1 1 1.5 1
Surcharge (kN/mm2) 50 0 50 0 0 0 50 0 50 0 50 50 50 50
8000
Pu, kN
Pu/fckBD vs vs M, kNm
Mu/fckBD^2
LOAD CASE
CONDITION Pu/kN Mu, kNm
Max value 6851 0.0
1.00 Min value -884 0.0
Max Pu 1666 107
7000 1
0.80 Min Pu 1389 107
Max Pu 1480 78
2
6000 0.60
Pu/fckBD
Min Pu 1221 78
Max Pu 1602 193
0.40 3 Min Pu 1036 193
5000 0.74% Max Pu 1416 164
6.00%
0.20 4 Min Pu 868 164
Pu, kN
0.80%
Data Max Pu 1482 75
4000
0.00 5 Min Pu 1231 75
Mu/FckBD^2
0.00
0.05
0.10
0.15
0.20
0.25
Max Pu 999 50
6 Min Pu 801 50
3000-0.20
Max Pu 1145 67
1. ALIGNMENT DATA
Dn
Nominal Diameter of Tunnel = 5.6 m
Construction Allowance DD = 100 mm
Thickness of Lining t = 0.275 m
Existing Ground Level: GL = 49.1 m
Track Level: RL = 30 m
Track Level to Invert of Tunnel d = 0.80 m
2. TUNNEL GEOMETRY
Excavated Diameter of Tunnel D = 6.35 m
Internal radius of tunnel ri = 2.9 m
Radius of lining centroid re = 3.0375 m
Radius to extrados of lining ro = 3.175 m
Distance between tunnel axis to rail level = 2.1 m
Depth to Tunnel Axis Zo = 17 m
3. LOADING
Ave. unit weight of Water gw = 10 kN/m3
Ave. unit weight of soil gs = 19.00 kN/m3
Water table from ground surface hw = 0m
ok
Height of Water Table considered in design hw 0m
Effective overburden pressure q1 = 153 kN/m2
Surcharge q2 = 50 kN/m2
Load factor for Overburden Load FS1 = 1.5
Load factor for Surcharge FS2 = 1.5
Factored vertical stress σv' = 304.50 kN/m2
k value K = 0.5
Factored horizontal stress, σh' = kσv' σh' = 152.3 kN/m2
Po = σv' - σh' Po = 152.3 kN/m2
Load factor for Water Fsw = 1.5
Hydrostatic water pressure psw = 255.00 kN/m2
A10 Ref 2
Q2 = Ee* r0^3 / 12EI(I+v) Q2 = 2.127
Sn =(1-Q2)po/2 * [I+Q2(3-2v/3-4v)] (ifSt,<t) Sn = -22.37
Sn=(3*(3-4v)*(p0/2)-(2Q2+(4-6v))t)/4Q2+5-6v , (if St>t) Sn = -1.41
Sn Used = -1.41
St= (1+2Q2)Po/2[1+Q2(3-2v/3-4v)] St = 104
M = -ro^2/6*(2Sn + St)*cos2θ M = -170
Md = -ro^2 /6 *(2Sn + St) Md = -106.563
N = -ro/3*(Sn +2St)cos2θ+Pw* r0+ No N = 1389
Nd = -ro/3*(Sn + 2St) Nd = -138.74
No=sv*(1+k)*ro/2+[2Ec*ro/Et*(1+v)] No = 717.76
Uw = -pw*ro^2/E*A Uw = -0.27
Uu =-No*ro/E*A Uu = -0.2
U=-ro^4/18EI*(2Sn+St)*cos2q +Uw+Uu U = -7
Ud=-r0^4/(18E*I)*(2*Sn+St) Ud = 9.28
x=rq dx/dq=r
V=r0/3*(2Sn+St)*sin2q V = 0
Vd=ro/3*(2Sn+St) Vd = 67.127
1. ALIGNMENT DATA
Dn
Nominal Diameter of Tunnel = 5.6 m
Construction Allowance DD = 100 mm
Thickness of Lining t = 0.275 m
Existing Ground Level: GL = 49.1 m
Track Level: RL = 30 m
Track Level to Invert of Tunnel d = 0.80 m
2. TUNNEL GEOMETRY
Excavated Diameter of Tunnel D = 6.35 m
Internal radius of tunnel ri = 2.9 m
Radius of lining centroid ro = 3.0375 m
Radius to extrados of lining re = 3.175 m
Distance between tunnel axis to rail level = 2.1 m
Depth to Tunnel Axis Zo = 17 m
3. LOADING
Ave. unit weight of Water gw = 10 kN/m3
Ave. unit weight of soil gs = 19.00 kN/m3
Water table from ground surface hw = 0m
ok
Height of Water Table considered in design hw 0m
Effective overburden pressure q1 = 153 kN/m2
Surcharge q2 = 0 kN/m2
Load factor for Overburden Load FS1 = 1.5
Load factor for Surcharge FS2 = 1.5
Factored vertical stress σv' = 229.50 kN/m2
k value K = 0.5
Factored horizontal stress, σh' = kσv' σh' = 114.8 kN/m2
Po = σv' - σh' Po = 114.8 kN/m2
Load factor for Water Fsw = 1.5
Hydrostatic water pressure psw = 255.00 kN/m2
A10 Ref 2
Q2 = Ee* r0^3 / 12EI(I+v) Q2 = 2.127
Sn =(1-Q2)po/2 * [I+Q2(3-2v/3-4v)] (ifSt,<t) Sn = -16.86
Sn=(3*(3-4v)*(p0/2)-(2Q2+(4-6v))t)/4Q2+5-6v , (if St>t) Sn = -10.06
Sn Used = -10.06
St= (1+2Q2)Po/2[1+Q2(3-2v/3-4v)] St = 79
M = -ro^2/6*(2Sn + St)*cos2θ M = -98
Md = -ro^2 /6 *(2Sn + St) Md = -77.506
N = -ro/3*(Sn +2St)cos2θ+Pw* r0+ No N = 1221
Nd = -ro/3*(Sn + 2St) Nd = -129.58
No=sv*(1+k)*ro/2+[2Ec*ro/Et*(1+v)] No = 540.97
Uw = -pw*ro^2/E*A Uw = -0.27
Uu =-No*ro/E*A Uu = -0.2
U=-ro^4/18EI*(2Sn+St)*cos2q +Uw+Uu U = -5
Ud=-r0^4/(18E*I)*(2*Sn+St) Ud = 6.75
x=rq dx/dq=r
V=r0/3*(2Sn+St)*sin2q V = 0
Vd=ro/3*(2Sn+St) Vd = 48.823
1. ALIGNMENT DATA
Dn
Nominal Diameter of Tunnel = 5.6 m
Construction Allowance DD = 100 mm
Thickness of Lining t = 0.275 m
Existing Ground Level: GL = 49.1 m
Track Level: RL = 30 m
Track Level to Invert of Tunnel d = 0.80 m
2. TUNNEL GEOMETRY
Excavated Diameter of Tunnel D = 6.35 m
Internal radius of tunnel ri = 2.9 m
Radius of lining centroid ro = 3.0375 m
Radius to extrados of lining re = 3.175 m
Distance between tunnel axis to rail level = 2.1 m
Depth to Tunnel Axis Zo = 17 m
3. LOADING
Ave. unit weight of Water gw = 10 kN/m3
Ave. unit weight of soil gs = 19.00 kN/m3
Water table from ground surface hw = 25.00 m
recheck the water table level
Height of Water Table considered in design hw 17 m
Effective overburden pressure q1 = 323 kN/m2
Surcharge q2 = 50 kN/m2
Load factor for Overburden Load FS1 = 1.5
Load factor for Surcharge FS2 = 1.5
Factored vertical stress σv' = 559.50 kN/m2
k value K = 0.5
Factored horizontal stress, σh' = kσv' σh' = 279.8 kN/m2
Po = σv' - σh' Po = 279.8 kN/m2
Load factor for Water Fsw = 1.5
Hydrostatic water pressure psw = 0.00 kN/m2
A10 Ref 2
Q2 = Ee* r0^3 / 12EI(I+v) Q2 = 2.127
Sn =(1-Q2)po/2 * [I+Q2(3-2v/3-4v)] (ifSt,<t) Sn = -41.10
Sn=(3*(3-4v)*(p0/2)-(2Q2+(4-6v))t)/4Q2+5-6v , (if St>t) Sn = -12.59
Sn Used = -12.59
St= (1+2Q2)Po/2[1+Q2(3-2v/3-4v)] St = 192
M = -ro^2/6*(2Sn + St)*cos2θ M = -280
Md = -ro^2 /6 *(2Sn + St) Md = -192.682
N = -ro/3*(Sn +2St)cos2θ+Pw* r0+ No N = 1036
Nd = -ro/3*(Sn + 2St) Nd = -282.72
No=sv*(1+k)*ro/2+[2Ec*ro/Et*(1+v)] No = 1318.84
Uw = -pw*ro^2/E*A Uw = 0.00
Uu =-No*ro/E*A Uu = -0.4
U=-ro^4/18EI*(2Sn+St)*cos2q +Uw+Uu U = -11
Ud=-r0^4/(18E*I)*(2*Sn+St) Ud = 16.78
x=rq dx/dq=r
V=r0/3*(2Sn+St)*sin2q V = 0
Vd=ro/3*(2Sn+St) Vd = 121.374
1. ALIGNMENT DATA
Dn
Nominal Diameter of Tunnel = 5.6 m
Construction Allowance DD = 100 mm
Thickness of Lining t = 0.275 m
Existing Ground Level: GL = 49.1 m
Track Level: RL = 30 m
Track Level to Invert of Tunnel d = 0.80 m
2. TUNNEL GEOMETRY
Excavated Diameter of Tunnel D = 6.35 m
Internal radius of tunnel ri = 2.9 m
Radius of lining centroid ro = 3.0375 m
Radius to extrados of lining re = 3.175 m
Distance between tunnel axis to rail level = 2.1 m
Depth to Tunnel Axis Zo = 17 m
3. LOADING
Ave. unit weight of Water gw = 10 kN/m3
Ave. unit weight of soil gs = 19.00 kN/m3
Water table from ground surface hw = 25.00 m
recheck the water table level
Height of Water Table considered in design hw 17 m
Effective overburden pressure q1 = 323 kN/m2
Surcharge q2 = 0 kN/m2
Load factor for Overburden Load FS1 = 1.5
Load factor for Surcharge FS2 = 1.5
Factored vertical stress σv' = 484.50 kN/m2
k value K = 0.5
Factored horizontal stress, σh' = kσv' σh' = 242.3 kN/m2
Po = σv' - σh' Po = 242.3 kN/m2
Load factor for Water Fsw = 1.5
Hydrostatic water pressure psw = 0.00 kN/m2
A10 Ref 2
Q2 = Ee* r0^3 / 12EI(I+v) Q2 = 2.127
Sn =(1-Q2)po/2 * [I+Q2(3-2v/3-4v)] (ifSt,<t) Sn = -35.59
Sn=(3*(3-4v)*(p0/2)-(2Q2+(4-6v))t)/4Q2+5-6v , (if St>t) Sn = -21.24
Sn Used = -21.24
St= (1+2Q2)Po/2[1+Q2(3-2v/3-4v)] St = 166
M = -ro^2/6*(2Sn + St)*cos2θ M = -207
Md = -ro^2 /6 *(2Sn + St) Md = -163.625
N = -ro/3*(Sn +2St)cos2θ+Pw* r0+ No N = 868
Nd = -ro/3*(Sn + 2St) Nd = -273.57
No=sv*(1+k)*ro/2+[2Ec*ro/Et*(1+v)] No = 1142.05
Uw = -pw*ro^2/E*A Uw = 0.00
Uu =-No*ro/E*A Uu = -0.4
U=-ro^4/18EI*(2Sn+St)*cos2q +Uw+Uu U = -10
Ud=-r0^4/(18E*I)*(2*Sn+St) Ud = 14.25
x=rq dx/dq=r
V=r0/3*(2Sn+St)*sin2q V = 0
Vd=ro/3*(2Sn+St) Vd = 103.071
1. ALIGNMENT DATA
Dn
Nominal Diameter of Tunnel = 5.6 m
Construction Allowance DD = 100 mm
Thickness of Lining t = 0.275 m
Existing Ground Level: GL = 49.1 m
Track Level: RL = 30 m
Track Level to Invert of Tunnel d = 0.80 m
2. TUNNEL GEOMETRY
Excavated Diameter of Tunnel D = 6.35 m
Internal radius of tunnel ri = 2.9 m
Radius of lining centroid ro = 3.0375 m
Radius to extrados of lining re = 3.175 m
Distance between tunnel axis to rail level = 2.1 m
Depth to Tunnel Axis Zo = 17 m
3. LOADING
Ave. unit weight of Water gw = 10 kN/m3
Ave. unit weight of soil gs = 19.00 kN/m3
Water table from ground surface hw = -0.5 m
ok
Height of Water Table considered in design hw -0.5 m
Effective overburden pressure q1 = 148 kN/m2
Surcharge q2 = 0 kN/m2
Load factor for Overburden Load FS1 = 1.5
Load factor for Surcharge FS2 = 1.5
Factored vertical stress σv' = 222.00 kN/m2
k value K = 0.5
Factored horizontal stress, σh' = kσv' σh' = 111.0 kN/m2
Po = σv' - σh' Po = 111.0 kN/m2
Load factor for Water Fsw = 1.5
Hydrostatic water pressure psw = 262.50 kN/m2
A10 Ref 2
Q2 = Ee* r0^3 / 12EI(I+v) Q2 = 2.127
Sn =(1-Q2)po/2 * [I+Q2(3-2v/3-4v)] (ifSt,<t) Sn = -16.31
Sn=(3*(3-4v)*(p0/2)-(2Q2+(4-6v))t)/4Q2+5-6v , (if St>t) Sn = -9.73
Sn Used = -9.73
St= (1+2Q2)Po/2[1+Q2(3-2v/3-4v)] St = 76
M = -ro^2/6*(2Sn + St)*cos2θ M = -95
Md = -ro^2 /6 *(2Sn + St) Md = -74.974
N = -ro/3*(Sn +2St)cos2θ+Pw* r0+ No N = 1231
Nd = -ro/3*(Sn + 2St) Nd = -125.35
No=sv*(1+k)*ro/2+[2Ec*ro/Et*(1+v)] No = 523.29
Uw = -pw*ro^2/E*A Uw = -0.28
Uu =-No*ro/E*A Uu = -0.2
U=-ro^4/18EI*(2Sn+St)*cos2q +Uw+Uu U = -5
Ud=-r0^4/(18E*I)*(2*Sn+St) Ud = 6.53
x=rq dx/dq=r
V=r0/3*(2Sn+St)*sin2q V = 0
Vd=ro/3*(2Sn+St) Vd = 47.227
1. ALIGNMENT DATA
Dn
Nominal Diameter of Tunnel = 5.6 m
Construction Allowance DD = 100 mm
Thickness of Lining t = 0.275 m
Existing Ground Level: GL = 49.1 m
Track Level: RL = 30 m
Track Level to Invert of Tunnel d = 0.80 m
2. TUNNEL GEOMETRY
Excavated Diameter of Tunnel D = 6.35 m
Internal radius of tunnel ri = 2.9 m
Radius of lining centroid ro = 3.0375 m
Radius to extrados of lining re = 3.175 m
Distance between tunnel axis to rail level = 2.1 m
Depth to Tunnel Axis Zo = 17 m
3. LOADING
Ave. unit weight of Water gw = 10 kN/m3
Ave. unit weight of soil gs = 19.00 kN/m3
Water table from ground surface hw = 0m
ok
Height of Water Table considered in design hw 0m
Effective overburden pressure q1 = 153 kN/m2
Surcharge q2 = 0 kN/m2
Load factor for Overburden Load FS1 = 1
Load factor for Surcharge FS2 = 1
Factored vertical stress σv' = 153.00 kN/m2
k value K = 0.5
Factored horizontal stress, σh' = kσv' σh' = 76.5 kN/m2
Po = σv' - σh' Po = 76.5 kN/m2
Load factor for Water Fsw = 1
Hydrostatic water pressure psw = 170.00 kN/m2
A10 Ref 2
Q2 = Ee* r0^3 / 12EI(I+v) Q2 = 2.127
Sn =(1-Q2)po/2 * [I+Q2(3-2v/3-4v)] (ifSt,<t) Sn = -11.24
Sn=(3*(3-4v)*(p0/2)-(2Q2+(4-6v))t)/4Q2+5-6v , (if St>t) Sn = -18.88
Sn Used = -11.24
St= (1+2Q2)Po/2[1+Q2(3-2v/3-4v)] St = 52
M = -ro^2/6*(2Sn + St)*cos2θ M = -50
Md = -ro^2 /6 *(2Sn + St) Md = -50.255
N = -ro/3*(Sn +2St)cos2θ+Pw* r0+ No N = 801
Nd = -ro/3*(Sn + 2St) Nd = -99.00
No=sv*(1+k)*ro/2+[2Ec*ro/Et*(1+v)] No = 360.65
Uw = -pw*ro^2/E*A Uw = -0.18
Uu =-No*ro/E*A Uu = -0.1
U=-ro^4/18EI*(2Sn+St)*cos2q +Uw+Uu U = -3
Ud=-r0^4/(18E*I)*(2*Sn+St) Ud = 4.38
x=rq dx/dq=r
V=r0/3*(2Sn+St)*sin2q V = 0
Vd=ro/3*(2Sn+St) Vd = 31.657
1. ALIGNMENT DATA
Dn
Nominal Diameter of Tunnel = 5.6 m
Construction Allowance DD = 100 mm
Thickness of Lining t = 0.275 m
Existing Ground Level: GL = 49.1 m
Track Level: RL = 30 m
Track Level to Invert of Tunnel d = 0.80 m
2. TUNNEL GEOMETRY
Excavated Diameter of Tunnel D = 6.35 m
Internal radius of tunnel ri = 2.9 m
Radius of lining centroid ro = 3.0375 m
Radius to extrados of lining re = 3.175 m
Distance between tunnel axis to rail level = 2.1 m
Depth to Tunnel Axis Zo = 17 m
3. LOADING
Ave. unit weight of Water gw = 10 kN/m3
Ave. unit weight of soil gs = 19.00 kN/m3
Water table from ground surface hw = 0m
ok
Height of Water Table considered in design hw 0m
Effective overburden pressure q1 = 153 kN/m2
Surcharge q2 = 50 kN/m2
Load factor for Overburden Load FS1 = 1
Load factor for Surcharge FS2 = 1
Factored vertical stress σv' = 203.00 kN/m2
k value K = 0.5
Factored horizontal stress, σh' = kσv' σh' = 101.5 kN/m2
Po = σv' - σh' Po = 101.5 kN/m2
Load factor for Water Fsw = 1
Hydrostatic water pressure psw = 170.00 kN/m2
A10 Ref 2
Q2 = Ee* r0^3 / 12EI(I+v) Q2 = 2.127
Sn =(1-Q2)po/2 * [I+Q2(3-2v/3-4v)] (ifSt,<t) Sn = -14.91
Sn=(3*(3-4v)*(p0/2)-(2Q2+(4-6v))t)/4Q2+5-6v , (if St>t) Sn = -13.11
Sn Used = -13.11
St= (1+2Q2)Po/2[1+Q2(3-2v/3-4v)] St = 70
M = -ro^2/6*(2Sn + St)*cos2θ M = -73
Md = -ro^2 /6 *(2Sn + St) Md = -67.240
N = -ro/3*(Sn +2St)cos2θ+Pw* r0+ No N = 892
Nd = -ro/3*(Sn + 2St) Nd = -126.35
No=sv*(1+k)*ro/2+[2Ec*ro/Et*(1+v)] No = 478.51
Uw = -pw*ro^2/E*A Uw = -0.18
Uu =-No*ro/E*A Uu = -0.2
U=-ro^4/18EI*(2Sn+St)*cos2q +Uw+Uu U = -4
Ud=-r0^4/(18E*I)*(2*Sn+St) Ud = 5.86
x=rq dx/dq=r
V=r0/3*(2Sn+St)*sin2q V = 0
Vd=ro/3*(2Sn+St) Vd = 42.356
1. ALIGNMENT DATA
Dn
Nominal Diameter of Tunnel = 5.6 m
Construction Allowance DD = 100 mm
Thickness of Lining t = 0.275 m
Existing Ground Level: GL = 49.1 m
Track Level: RL = 30 m
Track Level to Invert of Tunnel d = 0.80 m
2. TUNNEL GEOMETRY
Excavated Diameter of Tunnel D = 6.35 m
Internal radius of tunnel ri = 2.9 m
Radius of lining centroid ro = 3.0375 m
Radius to extrados of lining re = 3.175 m
Distance between tunnel axis to rail level = 2.1 m
Depth to Tunnel Axis Zo = 17 m
3. LOADING
Ave. unit weight of Water gw = 10 kN/m3
Ave. unit weight of soil gs = 19.00 kN/m3
Water table from ground surface hw = 25.00 m
recheck the water table level
Height of Water Table considered in design hw 17 m
Effective overburden pressure q1 = 323 kN/m2
Surcharge q2 = 0 kN/m2
Load factor for Overburden Load FS1 = 1
Load factor for Surcharge FS2 = 1
Factored vertical stress σv' = 323.00 kN/m2
k value K = 0.5
Factored horizontal stress, σh' = kσv' σh' = 161.5 kN/m2
Po = σv' - σh' Po = 161.5 kN/m2
Load factor for Water Fsw = 1
Hydrostatic water pressure psw = 0.00 kN/m2
A10 Ref 2
Q2 = Ee* r0^3 / 12EI(I+v) Q2 = 2.127
Sn =(1-Q2)po/2 * [I+Q2(3-2v/3-4v)] (ifSt,<t) Sn = -23.73
Sn=(3*(3-4v)*(p0/2)-(2Q2+(4-6v))t)/4Q2+5-6v , (if St>t) Sn = -39.86
Sn Used = -23.73
St= (1+2Q2)Po/2[1+Q2(3-2v/3-4v)] St = 111
M = -ro^2/6*(2Sn + St)*cos2θ M = -106
Md = -ro^2 /6 *(2Sn + St) Md = -106.094
N = -ro/3*(Sn +2St)cos2θ+Pw* r0+ No N = 552
Nd = -ro/3*(Sn + 2St) Nd = -208.99
No=sv*(1+k)*ro/2+[2Ec*ro/Et*(1+v)] No = 761.37
Uw = -pw*ro^2/E*A Uw = 0.00
Uu =-No*ro/E*A Uu = -0.3
U=-ro^4/18EI*(2Sn+St)*cos2q +Uw+Uu U = -6
Ud=-r0^4/(18E*I)*(2*Sn+St) Ud = 9.24
x=rq dx/dq=r
V=r0/3*(2Sn+St)*sin2q V = 0
Vd=ro/3*(2Sn+St) Vd = 66.831
1. ALIGNMENT DATA
Dn
Nominal Diameter of Tunnel = 5.6 m
Construction Allowance DD = 100 mm
Thickness of Lining t = 0.275 m
Existing Ground Level: GL = 49.1 m
Track Level: RL = 30 m
Track Level to Invert of Tunnel d = 0.80 m
2. TUNNEL GEOMETRY
Excavated Diameter of Tunnel D = 6.35 m
Internal radius of tunnel ri = 2.9 m
Radius of lining centroid ro = 3.0375 m
Radius to extrados of lining re = 3.175 m
Distance between tunnel axis to rail level = 2.1 m
Depth to Tunnel Axis Zo = 17 m
3. LOADING
Ave. unit weight of Water gw = 10 kN/m3
Ave. unit weight of soil gs = 19.00 kN/m3
Water table from ground surface hw = 25.00 m
recheck the water table level
Height of Water Table considered in design hw 17 m
Effective overburden pressure q1 = 323 kN/m2
Surcharge q2 = 50 kN/m2
Load factor for Overburden Load FS1 = 1
Load factor for Surcharge FS2 = 1
Factored vertical stress σv' = 373.00 kN/m2
k value K = 0.5
Factored horizontal stress, σh' = kσv' σh' = 186.5 kN/m2
Po = σv' - σh' Po = 186.5 kN/m2
Load factor for Water Fsw = 1
Hydrostatic water pressure psw = 0.00 kN/m2
A10 Ref 2
Q2 = Ee* r0^3 / 12EI(I+v) Q2 = 2.127
Sn =(1-Q2)po/2 * [I+Q2(3-2v/3-4v)] (ifSt,<t) Sn = -27.40
Sn=(3*(3-4v)*(p0/2)-(2Q2+(4-6v))t)/4Q2+5-6v , (if St>t) Sn = -34.09
Sn Used = -27.40
St= (1+2Q2)Po/2[1+Q2(3-2v/3-4v)] St = 128
M = -ro^2/6*(2Sn + St)*cos2θ M = -123
Md = -ro^2 /6 *(2Sn + St) Md = -122.517
N = -ro/3*(Sn +2St)cos2θ+Pw* r0+ No N = 638
Nd = -ro/3*(Sn + 2St) Nd = -241.35
No=sv*(1+k)*ro/2+[2Ec*ro/Et*(1+v)] No = 879.23
Uw = -pw*ro^2/E*A Uw = 0.00
Uu =-No*ro/E*A Uu = -0.3
U=-ro^4/18EI*(2Sn+St)*cos2q +Uw+Uu U = -7
Ud=-r0^4/(18E*I)*(2*Sn+St) Ud = 10.67
x=rq dx/dq=r
V=r0/3*(2Sn+St)*sin2q V = 0
Vd=ro/3*(2Sn+St) Vd = 77.176
1. ALIGNMENT DATA
Dn
Nominal Diameter of Tunnel = 5.6 m
Construction Allowance DD = 100 mm
Thickness of Lining t = 0.275 m
Existing Ground Level: GL = 49.1 m
Track Level: RL = 30 m
Track Level to Invert of Tunnel d = 0.80 m
2. TUNNEL GEOMETRY
Excavated Diameter of Tunnel D = 6.35 m
Internal radius of tunnel ri = 2.9 m
Radius of lining centroid ro = 3.0375 m
Radius to extrados of lining re = 3.175 m
Distance between tunnel axis to rail level = 2.1 m
Depth to Tunnel Axis Zo = 17 m
3. LOADING
Ave. unit weight of Water gw = 10 kN/m3
Ave. unit weight of soil gs = 19.00 kN/m3
Water table from ground surface hw = 3.00 m
ok
Height of Water Table considered in design hw 3m
Effective overburden pressure q1 = 183 kN/m2
Surcharge q2 = 0 kN/m2
Load factor for Overburden Load FS1 = 1
Load factor for Surcharge FS2 = 1
Factored vertical stress σv' = 183.00 kN/m2
k value K = 0.5
Factored horizontal stress, σh' = kσv' σh' = 91.5 kN/m2
Po = σv' - σh' Po = 91.5 kN/m2
Load factor for Water Fsw = 1
Hydrostatic water pressure psw = 140.00 kN/m2
A10 Ref 2
Q2 = Ee* r0^3 / 12EI(I+v) Q2 = 2.127
Sn =(1-Q2)po/2 * [I+Q2(3-2v/3-4v)] (ifSt,<t) Sn = -13.44
Sn=(3*(3-4v)*(p0/2)-(2Q2+(4-6v))t)/4Q2+5-6v , (if St>t) Sn = -22.58
Sn Used = -13.44
St= (1+2Q2)Po/2[1+Q2(3-2v/3-4v)] St = 63
M = -ro^2/6*(2Sn + St)*cos2θ M = -60
Md = -ro^2 /6 *(2Sn + St) Md = -60.109
N = -ro/3*(Sn +2St)cos2θ+Pw* r0+ No N = 757
Nd = -ro/3*(Sn + 2St) Nd = -118.41
No=sv*(1+k)*ro/2+[2Ec*ro/Et*(1+v)] No = 431.36
Uw = -pw*ro^2/E*A Uw = -0.15
Uu =-No*ro/E*A Uu = -0.1
U=-ro^4/18EI*(2Sn+St)*cos2q +Uw+Uu U = -4
Ud=-r0^4/(18E*I)*(2*Sn+St) Ud = 5.24
x=rq dx/dq=r
V=r0/3*(2Sn+St)*sin2q V = 0
Vd=ro/3*(2Sn+St) Vd = 37.864
1. ALIGNMENT DATA
Dn
Nominal Diameter of Tunnel = 5.6 m
Construction Allowance DD = 100 mm
Thickness of Lining t = 0.275 m
Existing Ground Level: GL = 49.1 m
Track Level: RL = 30 m
Track Level to Invert of Tunnel d = 0.80 m
2. TUNNEL GEOMETRY
Excavated Diameter of Tunnel D = 6.35 m
Internal radius of tunnel ri = 2.9 m
Radius of lining centroid ro = 3.0375 m
Radius to extrados of lining re = 3.175 m
Distance between tunnel axis to rail level = 2.1 m
Depth to Tunnel Axis Zo = 17 m
3. LOADING
Ave. unit weight of Water gw = 10 kN/m3
Ave. unit weight of soil gs = 19.00 kN/m3
Water table from ground surface hw = 0.00 m
ok
Height of Water Table considered in design hw 0m
Effective overburden pressure q1 = 153 kN/m2
Surcharge q2 = 50 kN/m2
Load factor for Overburden Load FS1 = 1
Load factor for Surcharge FS2 = 1
Factored vertical stress σv' = 203.00 kN/m2
k value K = 0.5
Factored horizontal stress, σh' = kσv' σh' = 101.5 kN/m2
Po = σv' - σh' Po = 101.5 kN/m2
Load factor for Water Fsw = 1
Hydrostatic water pressure psw = 170.00 kN/m2
A10 Ref 2
Q2 = Ee* r0^3 / 12EI(I+v) Q2 = 4.254
Sn =(1-Q2)po/2 * [I+Q2(3-2v/3-4v)] (ifSt,<t) Sn = -24.75
Sn=(3*(3-4v)*(p0/2)-(2Q2+(4-6v))t)/4Q2+5-6v , (if St>t) Sn = -21.54
Sn Used = -21.54
St= (1+2Q2)Po/2[1+Q2(3-2v/3-4v)] St = 72
M = -ro^2/6*(2Sn + St)*cos2θ M = -49
Md = -ro^2 /6 *(2Sn + St) Md = -38.941
N = -ro/3*(Sn +2St)cos2θ+Pw* r0+ No N = 896
Nd = -ro/3*(Sn + 2St) Nd = -117.44
No=sv*(1+k)*ro/2+[2Ec*ro/Et*(1+v)] No = 473.72
Uw = -pw*ro^2/E*A Uw = -0.36
Uu =-No*ro/E*A Uu = -0.3
U=-ro^4/18EI*(2Sn+St)*cos2q +Uw+Uu U = -5
Ud=-r0^4/(18E*I)*(2*Sn+St) Ud = 6.78
x=rq dx/dq=r
V=r0/3*(2Sn+St)*sin2q V = 0
Vd=ro/3*(2Sn+St) Vd = 24.530
1. ALIGNMENT DATA
Dn
Nominal Diameter of Tunnel = 5.6 m
Construction Allowance DD = 100 mm
Thickness of Lining t = 0.275 m
Existing Ground Level: GL = 49.1 m
Track Level: RL = 30 m
Track Level to Invert of Tunnel d = 0.80 m
2. TUNNEL GEOMETRY
Excavated Diameter of Tunnel D = 6.35 m
Internal radius of tunnel ri = 2.9 m
Radius of lining centroid ro = 3.0375 m
Radius to extrados of lining re = 3.175 m
Distance between tunnel axis to rail level = 2.1 m
Depth to Tunnel Axis Zo = 17 m
3. LOADING
Ave. unit weight of Water gw = 10 kN/m3
Ave. unit weight of soil gs = 19.00 kN/m3
Water table from ground surface hw = 25.00 m
recheck the water table level
Height of Water Table considered in design hw 17 m
Effective overburden pressure q1 = 323 kN/m2
Surcharge q2 = 50 kN/m2
Load factor for Overburden Load FS1 = 1
Load factor for Surcharge FS2 = 1
Factored vertical stress σv' = 373.00 kN/m2
k value K = 0.5
Factored horizontal stress, σh' = kσv' σh' = 186.5 kN/m2
Po = σv' - σh' Po = 186.5 kN/m2
Load factor for Water Fsw = 1
Hydrostatic water pressure psw = 0.00 kN/m2
A10 Ref 2
Q2 = Ee* r0^3 / 12EI(I+v) Q2 = 4.254
Sn =(1-Q2)po/2 * [I+Q2(3-2v/3-4v)] (ifSt,<t) Sn = -45.48
Sn=(3*(3-4v)*(p0/2)-(2Q2+(4-6v))t)/4Q2+5-6v , (if St>t) Sn = -49.18
Sn Used = -45.48
St= (1+2Q2)Po/2[1+Q2(3-2v/3-4v)] St = 133
M = -ro^2/6*(2Sn + St)*cos2θ M = -70
Md = -ro^2 /6 *(2Sn + St) Md = -70.439
N = -ro/3*(Sn +2St)cos2θ+Pw* r0+ No N = 637
Nd = -ro/3*(Sn + 2St) Nd = -233.14
No=sv*(1+k)*ro/2+[2Ec*ro/Et*(1+v)] No = 870.43
Uw = -pw*ro^2/E*A Uw = 0.00
Uu =-No*ro/E*A Uu = -0.6
U=-ro^4/18EI*(2Sn+St)*cos2q +Uw+Uu U = -9
Ud=-r0^4/(18E*I)*(2*Sn+St) Ud = 12.27
x=rq dx/dq=r
V=r0/3*(2Sn+St)*sin2q V = 0
Vd=ro/3*(2Sn+St) Vd = 44.371
1. ALIGNMENT DATA
Dn
Nominal Diameter of Tunnel = 5.6 m
Construction Allowance DD = 100 mm
Thickness of Lining t = 0.275 m
Existing Ground Level: GL = 49.1 m
Track Level: RL = 30 m
Track Level to Invert of Tunnel d = 0.80 m
2. TUNNEL GEOMETRY
Excavated Diameter of Tunnel D = 6.35 m
Internal radius of tunnel ri = 2.9 m
Radius of lining centroid ro = 3.0375 m
Radius to extrados of lining re = 3.175 m
Distance between tunnel axis to rail level = 2.1 m
Depth to Tunnel Axis Zo = 17 m
3. LOADING
Ave. unit weight of Water gw = 10 kN/m3
Ave. unit weight of soil gs = 19.00 kN/m3
Water table from ground surface hw = 25.00 m
recheck the water table level
Height of Water Table considered in design hw 17 m
Effective overburden pressure q1 = 323 kN/m2
Surcharge q2 = 50 kN/m2
Load factor for Overburden Load FS1 = 1.5
Load factor for Surcharge FS2 = 1.5
Factored vertical stress σv' = 559.50 kN/m2
k value K = 0.5
Factored horizontal stress, σh' = kσv' σh' = 279.8 kN/m2
Po = σv' - σh' Po = 279.8 kN/m2
Load factor for Water Fsw = 1.5
Hydrostatic water pressure psw = 0.00 kN/m2
A10 Ref 2
Q2 = Ee* r0^3 / 12EI(I+v) Q2 = 4.254
Sn =(1-Q2)po/2 * [I+Q2(3-2v/3-4v)] (ifSt,<t) Sn = -68.22
Sn=(3*(3-4v)*(p0/2)-(2Q2+(4-6v))t)/4Q2+5-6v , (if St>t) Sn = -36.72
Sn Used = -36.72
St= (1+2Q2)Po/2[1+Q2(3-2v/3-4v)] St = 199
M = -ro^2/6*(2Sn + St)*cos2θ M = -212
Md = -ro^2 /6 *(2Sn + St) Md = -111.589
N = -ro/3*(Sn +2St)cos2θ+Pw* r0+ No N = 1048
Nd = -ro/3*(Sn + 2St) Nd = -257.18
No=sv*(1+k)*ro/2+[2Ec*ro/Et*(1+v)] No = 1305.64
Uw = -pw*ro^2/E*A Uw = 0.00
Uu =-No*ro/E*A Uu = -0.9
U=-ro^4/18EI*(2Sn+St)*cos2q +Uw+Uu U = -14
Ud=-r0^4/(18E*I)*(2*Sn+St) Ud = 19.44
x=rq dx/dq=r
V=r0/3*(2Sn+St)*sin2q V = 0
Vd=ro/3*(2Sn+St) Vd = 70.293
1. ALIGNMENT DATA
Dn
Nominal Diameter of Tunnel = 5.6 m
Construction Allowance DD = 100 mm
Thickness of Lining t = 0.275 m
Existing Ground Level: GL = 49.1 m
Track Level: RL = 30 m
Track Level to Invert of Tunnel d = 0.80 m
2. TUNNEL GEOMETRY
Excavated Diameter of Tunnel D = 6.35 m
Internal radius of tunnel ri = 2.9 m
Radius of lining centroid ro = 3.0375 m
Radius to extrados of lining re = 3.175 m
Distance between tunnel axis to rail level = 2.1 m
Depth to Tunnel Axis Zo = 17 m
3. LOADING
Ave. unit weight of Water gw = 10 kN/m3
Ave. unit weight of soil gs = 19.00 kN/m3
Water table from ground surface hw = 25.00 m
recheck the water table level
Height of Water Table considered in design hw 17 m
Effective overburden pressure q1 = 323 kN/m2
Surcharge q2 = 50 kN/m2
Load factor for Overburden Load FS1 = 1
Load factor for Surcharge FS2 = 1
Factored vertical stress σv' = 373.00 kN/m2
k value K = 0.5
Factored horizontal stress, σh' = kσv' σh' = 186.5 kN/m2
Po = σv' - σh' Po = 186.5 kN/m2
Load factor for Water Fsw = 1
Hydrostatic water pressure psw = 0.00 kN/m2
A10 Ref 2
Q2 = Ee* r0^3 / 12EI(I+v) Q2 = 4.254
Sn =(1-Q2)po/2 * [I+Q2(3-2v/3-4v)] (ifSt,<t) Sn = -45.48
Sn=(3*(3-4v)*(p0/2)-(2Q2+(4-6v))t)/4Q2+5-6v , (if St>t) Sn = -49.18
Sn Used = -45.48
St= (1+2Q2)Po/2[1+Q2(3-2v/3-4v)] St = 133
M = -ro^2/6*(2Sn + St)*cos2θ M = -70
Md = -ro^2 /6 *(2Sn + St) Md = -70.439
N = -ro/3*(Sn +2St)cos2θ+Pw* r0+ No N = 637
Nd = -ro/3*(Sn + 2St) Nd = -233.14
No=sv*(1+k)*ro/2+[2Ec*ro/Et*(1+v)] No = 870.43
Uw = -pw*ro^2/E*A Uw = 0.00
Uu =-No*ro/E*A Uu = -0.6
U=-ro^4/18EI*(2Sn+St)*cos2q +Uw+Uu U = -9
Ud=-r0^4/(18E*I)*(2*Sn+St) Ud = 12.27
x=rq dx/dq=r
V=r0/3*(2Sn+St)*sin2q V = 0
Vd=ro/3*(2Sn+St) Vd = 44.371
Additional Distorsion
17000
#REF!
MOI flexibsle linning = #REF!
= 32.55 .kNm/m run
= 48.82 .kNm/m run
axis bank 10000
icici bank 10000
hdfc loan 4000
bajaj finance 2000
mani jee loan 5000
credit card 10000
home 10000
room rent 10000
siva na 10000
prasoon flight tkt 8000
mohit flight tkt 8000
87000
LOAD COMBINATION 1
ULS for Short Term
Rigid Linning
No Creep
1. ALIGNMENT DATA
Dn
Nominal Diameter of Tunnel = 5.6 m
Construction Allowance DD = 100 mm
Thickness of Lining t = 0.275 m
Existing Ground Level: GL = 49.1 m
Track Level: RL = 32.383 m
Track Level to Invert of Tunnel d = 0.8000 m
2. TUNNEL GEOMETRY
Excavated Diameter of Tunnel D = 6.35 m
Internal radius of tunnel ri = 2.9 m
Radius of lining centroid ro = 3.0375 m
Radius to extrados of lining re = 3.175 m
Distance between tunnel axis to rail level = 2.1 m
Depth to Tunnel Axis Zo = 14.617 m
3. LOADING
Ave. unit weight of Water gw = 10 kN/m3
Ave. unit weight of soil gs = 18.00 kN/m3
Water table from ground surface hw = 0m
ok
Height of Water Table considered in design hw 0m
Effective overburden pressure q1 = 116.936 kN/m2
Surcharge q2 = 50 kN/m2
Load factor for Overburden Load FS1 = 1.5
Load factor for Surcharge FS2 = 1.5
Factored vertical stress σv' = 250.40 kN/m2
k value K = 0.5
Factored horizontal stress, σh' = kσv' σh' = 125.2 kN/m2
Po = σv' - σh' Po = 125.2 kN/m2
Load factor for Water Fsw = 1.5
Hydrostatic water pressure psw = 219.26 kN/m2
A10 Ref 2
Q2 = Ee* r0^3 / 12EI(I+v) Q2 = 0.516
Sn =(1-Q2)po/2 * [I+Q2(3-2v/3-4v)] (ifSt,<t) Sn = 17.96
Sn=(3*(3-4v)*(p0/2)-(2Q2+(4-6v))t)/4Q2+5-6v , (if St>t) Sn = 42.47
Sn Used = 42.47
St= (1+2Q2)Po/2[1+Q2(3-2v/3-4v)] St = 75
M = -ro^2/6*(2Sn + St)*cos2θ M = -246
Md = -ro^2 /6 *(2Sn + St) Md = -257.646
N = -ro/3*(Sn +2St)cos2θ+Pw* r0+ No N = 1064
Nd = -ro/3*(Sn + 2St) Nd = -204.45
No=sv*(1+k)*ro/2+[2Ec*ro/Et*(1+v)] No = 593.76
Uw = -pw*ro^2/E*A Uw = -0.21
Uu =-No*ro/E*A Uu = -0.2
U=-ro^4/18EI*(2Sn+St)*cos2q +Uw+Uu U = -13
Ud=-r0^4/(18E*I)*(2*Sn+St) Ud = 12.64
x=rq dx/dq=r
V=r0/3*(2Sn+St)*sin2q V = 0
Vd=ro/3*(2Sn+St) Vd = 162.297
1. ALIGNMENT DATA
Dn
Nominal Diameter of Tunnel = 5.6 m
Construction Allowance DD = 100 mm
Thickness of Lining t = 0.275 m
Existing Ground Level: GL = 101.925 m
Track Level: RL = 80.754 m
Track Level to Invert of Tunnel d = 1.3750 m
2. TUNNEL GEOMETRY
Excavated Diameter of Tunnel D = 6.35 m
Internal radius of tunnel ri = 2.9 m
Radius of lining centroid ro = 3.0375 m
Radius to extrados of lining re = 3.175 m
Distance between tunnel axis to rail level = 1.525 m
Depth to Tunnel Axis Zo = 19.646 m
3. LOADING
Ave. unit weight of Water gw = 10 kN/m3
Ave. unit weight of soil gs = 16.00 kN/m3
Water table from ground surface hw = 3m
ok
Height of Water Table considered in design hw 3m
Effective overburden pressure q1 = 147.876 kN/m2
Surcharge q2 = 0 kN/m2
Load factor for Overburden Load FS1 = 1
Load factor for Surcharge FS2 = 1
Factored vertical stress σv' = 147.88 kN/m2
k value K = 0.75
Factored horizontal stress, σh' = kσv' σh' = 110.9 kN/m2
Po = σv' - σh' Po = 36.969 kN/m2
Load factor for Water Fsw = 1
Hydrostatic water pressure psw = 166.46 kN/m2
A10 Ref 2
Q2 = Ee* r0^3 / 12EI(I+v) Q2 = 0.180
Sn =(1-Q2)po/2 * [I+Q2(3-2v/3-4v)] (ifSt,<t) Sn = 12.05
Sn=(3*(3-4v)*(p0/2)-(2Q2+(4-6v))t)/4Q2+5-6v , (if St>t) Sn = -8.12
Sn Used = 12.05
St= (1+2Q2)Po/2[1+Q2(3-2v/3-4v)] St = 20
M = -ro^2/6*(2Sn + St)*cos2θ M = -68
Md = -ro^2 /6 *(2Sn + St) Md = -70.834
N = -ro/3*(Sn +2St)cos2θ+Pw* r0+ No N = 863
Nd = -ro/3*(Sn + 2St) Nd = -55.02
No=sv*(1+k)*ro/2+[2Ec*ro/Et*(1+v)] No = 410.21
Uw = -pw*ro^2/E*A Uw = -0.18
Uu =-No*ro/E*A Uu = -0.1
U=-ro^4/18EI*(2Sn+St)*cos2q +Uw+Uu U = -4
Ud=-r0^4/(18E*I)*(2*Sn+St) Ud = 3.84
x=rq dx/dq=r
V=r0/3*(2Sn+St)*sin2q V = 0
Vd=ro/3*(2Sn+St) Vd = 44.620