HO TRUNG TINH
Welding/ NDT Engineer
SUMMARY
Nearly (10) years’ experience for sub/main contractors, third party and clients, mostly in the field of oil & gas, refinery and power
projects from engineering practices, inspection, fabrication to erection/ installation and testing. Has worked oversea (Malaysia)for
onshore and offshore projects such as structure, piping, tie-in, pipe laying, jacket, module,refinery plant, storage tank, and pressure
vessel, boiler erection under QAQC, supervisor role. As been participated in various internal under the requirements of ISO 9001 series
and project specifications. Knowledge and practice on the international codes and standards such as ISO, EN, AWS, ASTM, ANSI/
ASME, API, and DNV…and Technical Specification projects involved.
PROFESSIONAL EXPERIENCE
ALPHA NDT Aug 2019 –At Present
Page 1 of 6
CV_HO TRUNG TINH
Updated as on Jun 2020
NDT/QC engineer.
Fabricator: WASTE HEAT RECOVERY PROJECT and CRUDE FLEXIBILITY PROJECT ( Client: ADNOC)
Main Job: Skid/ Module for Stainless Steel, alloy Piping and structure.
Duties
Review documents including the NDE procedures, hydrostatic & pneumatic test, welding book with WPSs, PQRs, welder’s
qualification, external/Internal surface treatment procedure, welding & NDE matrix map drawing, mill certificate material, inspection
report, manufacture data book.
Coordinate and prepare the agenda for pre-inspection meeting, collect and raise the technical issue during PIM.
Review RT film, PAUT, witness MT, PT, UT, PMI, Hydro test, Hardness test…
Witness fit up inspection, witness golden weld repair, monitoring welding activity… etc at scope.
NGHI SON REFINERY AND PETROCHEMICAL PLANT (NSRP) Dec 2017– May 2018
Welding inspector - Client Side for Piping/Tank Repair Work
Nghi Son Refinery & Petrochemical Complex Project – Thanh Hoa Viet Nam
Duties
Verify weld joint need to repair.
Inspection of welding consumable.
Witness fit up inspection, witness golden weld repair, monitoring welding activity… etc at NSRP scope.
Witness hydro test, re-installment.
Witness PWHT, PMI, hardness test…
Review RT film.
Make request fit up, visual, NDT for weld joints completed
Page 2 of 6
CV_HO TRUNG TINH
Updated as on Jun 2020
Page 3 of 6
CV_HO TRUNG TINH
Updated as on Jun 2020
Page 4 of 6
CV_HO TRUNG TINH
Updated as on Jun 2020
Page 5 of 6
CV_HO TRUNG TINH
Updated as on Jun 2020
Page 6 of 6