Вы находитесь на странице: 1из 1

8 7 6 5 4 3 2 1

WELL SITES
CCTV DISPLAY CENTRAL CONTROL ROOM LEGEND & ABBREVIATIONS
UTILITIES NOTE 14
CPF ESD F&G
OFFSITE + SCADA
OVERVIEW
OVERVIEW
PANEL MATRIX NAWARA ACCOMMODATION CAMP HARDWIRED CABLE

F NOTE 27 DISTRIBUTED CONTROL NETWORK F


CCTV
NAWARA-1 NOTE 14
RTU´s
SAFTEY CONTROL NETWORK

NOTE 13 SERIAL LINK /OPC LINK

TCP / IP LINK
NOTE 4
WELLHEAD JOY DCN / SCN NETWORK EXTENSION
STICK PB PB PB
CONTROL PANEL MASCHINERY
PCS PCS ESD F&G E-SCADA METERING CONDITION NOTE 14 FD FLAME DETECTOR
PCS/SCADA ESD/FGS SOE
OWS OWS OWS OWS OWS OWS MONITORING OWS EWS EWS
ESD
HD HEAT DETECTOR
L

SD SMOKE DETECTOR
FD
ESD
MATRIX MAC MANUAL CALL POINT

GD GAS DETECTOR
NOTE 16
CCTV PCS HMI TRANSMITTER
RITMA-1 NOTE 14 RTU´s OWS
CONTROL VALVE
NOTE 13
ON/OFF VALVE
NOTE 14
NOTE 15 PB PUSH BUTTON
WELLHEAD
CONTROL PANEL PA/GA
ACESS
NOTE 15 NOTE 15 CCTV CAMERA/ ANTI INTRUSION DETECTION
NOTE 15 NOTE 15 NOTE 15 NOTE 15 NOTE 15 NOTE 15 NOTE 15

NOTE 5 CCTV CLOSED CIRCUIT TELEVISION


E E
L

DCN DISTRIBUTED CONTROL NETWORK


DISTRIBUTED CONTROL NETWORK DCS DISTRIBUTED CONTROL SYSTEM
FD
EDG EMERGENCY DIESEL GENERATOR
ESD EMERGENCY SHUT DOWN SYSTEM
NOTE 5
F&G FIRE & GAS SYSTEM
SAFETY CONTROL NETWORK GTG GAS TURBINE GENERATOR
CCTV IAMS INSTRUMENT ASSET MANAGEMENT SYSTEM
FELLA-1 NOTE 14
RTU´s
MC MARSHALLING CABINET
MMS MASCHINE MONITORING SYSTEM
NOTE 13 BUILDING MTU MASTER TERMINAL UNIT
CCTV
FGS NTP NETWORK TIME PROTOCOL
NOTE 14 OPC OPEN PROCESS CONTROL
WELLHEAD OWS OPERATOR WORK STATION
F&G PA/GA PUBLIC ADRESS & GENERAL ALARM
CONTROL PANEL MATRIX PIMS PLANT INFORMATION MANAGEMENT SYSTEM
PPL PIPELINE (REFER TO PIPELINE CONTRACTOR FOR SoW2)
RTU REMOTE TERMINAL UNIT
GD FD SCADA SUPERVISORY CONTROL & DATA ACQUISITION
L

SOE SEQUENCE OF EVENT RECORDER


FD UCP UNIT CONTROL PANEL

LOCAL OPERATOR ROOM NAWARA INSTRUMENT NOTES:


PCS / SCADA OWS / EWS ESD / F&G OWS / EWS E SCADA
KHOULOUD-1
CCTV NOTE 23 NOTE 23
HISTORIAN
OWS EQUIPMENT ROOM NOTE1: PCS AND ESD/F&G OWS INSTALLED AT IER SHALL BE CAPABLE TO ACT AS EWS WITH RESTRICTED AND
NOTE 14 RTU´s AUTHORIZED ACCESS CONTROL IN ORDER TO COVER FOR COMMISSIONING, START-UP AND TURN-DOWN
NOTE 13 NOTE 9, 27 ACTIVITIES.
NOTE 2: SHUT DOWN SIGNALS FOR WELL HEAD EQUIPMENT TO BE HARD WIRED TO ESD MARSAHLLING CABINESTS
RTU NOTE 3: ICSS SYSTEM SHALL BE SYCHRONISED WITH THE GPS CLOCK/NTP SERVER RESIDENT IN THE DCS
D ICSS SYSTEM
NOTE 4: DUAL REDUNDANT REMOTE COMMUNICATION WITH SEPARATE FIBRES FOR PCS AND ESD D
WELLHEAD SERVERS PIMS IAMS CONFIGURATION
LAPTOP NOTE 5: DCN & SCN DUAL REDUNDANT NETWORK EXTENSION CONNECTION & COMMUNICATION
CONTROL PANEL NOTE 24, 25 NOTE 17 NOTE 17 NOTE 6: THE CONTROL SYSTEM ARCHITECTURE WILL BE UPDATED DURING VENDOR DESIGN. FINAL ARCHITECTURE
NOTE 12 WITH VENDOR DESIGN WILL BE PROVIDED FOR COMPANY APPROVAL AS SOON AS ICSS VENDOR IS SELECTED.
NOTE 7: UPON FIRE DETECTION TRIP BLOWDOWN SYSTEM
NOTE 8: LACT UNIT FOR CONDENSATE TO TRAPSA
L

NOTE 9: SYSTEM SERVER UNIT FOR PCS; SCADA; DATA HISTORIAN; ESD; F&G; PA/GA AND CCTV WILL BE INSTALLED IN
FD
THE NAWARA IER. AT NAWARA NAC ONLY REMOTE WORKSTATIONS ARE AVAILABLE
NOTE 10: CCTV SIGNALS WILL USE SEPARATE FIBRE OPTIC CORE; THIS IS TRUE FOR ALL CCTV SIGNALS
GPS NOTE 11: GAS CHROMATOGRAPHY WILL BE PROVIDED WITH THE GAS METERING PACKAGE
CLOCK NOTE 12: MULTIPLE WORKSTATION THAT PROVIDES ACESS TO PCS; ESD; SOE AND F&G
NOTE 13: SEPARATE RTU´S FOR PCS AND ESD
CCTV NOTE 15 NOTE 15 NOTE 15 NOTE 15 NOTE 15 NOTE 15 NOTE 14: PART OF TELECOMMUNICATION
NOTE 3
SOUROUR-1 NOTE 14 RTU´s
NOTE 15 NOTE 15: ALL SERVERS, COMPUTERS, WORKSTATIONS SHALL BE RACK MOUNTED WITH KVM SYSTEM
NOTE 16: FULL TRAVEL KEYBOARD
PB
NOTE 13 NOTE 17: PLANT INFORMATION MANAGEMENT SYSTEM (PIMS) AND INSTRUMENT ASSET MANAGEMENT SYSTEM (IAMS)
WILL BE PROVIDED WITH THE REQUIRED HARDWARE AND SOFTWARE
NOTE 18: CABINETS WITH SERVERS UNITS FOR PCS; SCADA; DATA HISTORIAN; ESD AND F&G
WELLHEAD NOTE 19: ANY COMMUNICATION LINK BETWEEN DCS AND THIRD PARTY SYSTEM DIFFERENT THAN SERIAL LINK ( I.E.OPC)
SHALL BE SECURED BY DEDICATED FIREWALLS
CONTROL PANEL
NOTE 20: COMMUNICATION BEETWEEN E-SCADA AND DCS WILL BE THROUGH INTERFACE GATEWAY IF BRANDS ARE
DIFFERENT.
DISTRIBUTED CONTROL NETWORK NOTE 21: PACKE UCPS: OFF GAS COMPRESSION, COOLING MEDIUM SYSTEM, HEATING MEDIUM SYSTEM, INERT GAS
SYSTEM, INSTRUMENT AIR COMPRESSORS, HP-LP FLARE, CHLORINATION, SEWAGE TREATMENT, WATER
L

SYSTEM
FD NOTE 22: LINK TO PPL INTERFACE (SoW2)
NOTE 26 NOTE 23: EWS INTEGRATED WITH OWS/EWS
NOTE 24: MONITOR AND KEYBOARD OF ICSS SERVERS SHALL BE RACK MOUNTED IN THE SERVER CABINET
SAFETY CONTROL NETWORK NOTE 25: REDUNDANT ICSS SERVER
C NOTE 26: CONNECTION BETWEEN SCN AND DCN SHALL BE CARRIED OUT THROUGH REDUNDANT L3 SWITCHES/ROUTERS
CCTV NOTE 27: ALL REQUIRED ICSS LICENSES SHALL BE PROVIDED BY VENDOR. VIRTUAL MACHINES OR REMOTE DESKTOPS
BENEFSEJ-1 NOTE 14 FOR OWS AND EWS INSTALLED AT LOR AND CCR ARE NOT ALLOWED.
RTU´s MTU &
NOTE 13 Gateway
PCS CCTV
DCS DCS ESD FGS NOTE 14
WELLHEAD 001 27.04.2020 As Built Youssef.B Ali.H Jihed.A
CONTROL PANEL
000 19.06.2015 Issued for Use BALAZ/XIE ZEHL LÜB-HRT

C04 01.06.2015 Issued for Approval BALAZ/XIE ZEHL LÜB-HRT


L

NOTE 10 MTU &


FD
Gateway C03 17.02.2015 Re-Issued for Company Review ZEHL BALAZ SCHOR
ESD Resubmission in accordance with MOM Alignment ICT
C02 30.01.2015 13/14.01.2015 ZEHL BALAZ SCHOR

CCTV NOTE 18 C01 21.11.2014 Issued for Client Review ZEHL BALAZ SCHOR
BENEFSEJ-SUD NOTE 14
RTU´s
NOTE 13 B01 19.11.2014 Issue for IDC ZEHL LÜB-HRT
NOTES
2, 10
PACKAGE INTERFACE A01 03.11.2014 Issue for DIC ZEHL BALAZ
WELLHEAD NOTE 7
MMS GATEWAY REV DATE ISSUE, SCOPE OF REVISION PREPARED CHECKED APPROVED
CONTROL PANEL DCS MC ESD MC FGS MC
PROJECT TITLE:
NOTE 22

B NOTE 19
Nawara and South Tunisia Gas Development
L

FD

PA/GA
Central Process Facility (CPF), Flowlines and Wellpads
NOTE 14
COMPANY:
CCTV
AHLEM-1 NOTE 14 RTU´s
NOTE 13
OMV (Tunesien)
UCP
UCP GAS
Production GmbH

SAFE
PAKAGE UCPS

FAIL-
MONITORING AND CONDENSATE
WELLHEAD NOTE 21 FLOW COMPUTER MONITORING AND
CONTROL PANEL NOTE 20 FLOW COMPUTER CONTRACTOR:

STREICHER - BOUCHAMAOUI
L

MAX STREICHER GmbH & Co. KG aA


FD
BOUCHAMAOUI INDUSTRIES SA

ORIGINATOR:

CCTV
AHLEM-2 NOTE 14 ILF CONSULTING ENGINEERS
RTU´s
NOTE 13 NOTE 11 NOTE 8
E SCADA
A BUILDING GAS FISCAL CONDENSATE
WELLHEAD GTG RTU MTU DRAWING TITLE :
CONTROL PANEL F&G FLOW METERING FISCAL FLOW
MMS
SYSTEM SD HD
PPL (SoW2) SKID METERING SKID
GTG GTG EDG
HVAC
GD FD MAC
BEACONS LOUDSPEAKERS
CONTROL SYSTEM ARCHITECTURE DRAWING
SWITCHGEAR UCP UCP UCP
L
ORIGINAL SHEET SIZE - A1

L
PROJECT No. - 3170211

FD

"Copying of this document and giving it to others and the use

SUBSTATION NAWARA FIELD EQUIPMENT or communication of the contents thereof are forbidden without
express authority. Offenders are liable to the payment of SCALE: DRAWING NO: SHEET OF
damages. All rights are reserved in the event of the grant of a
patent or the registration of a utility model of design"
NTS NAWCPF-MSBI-NCPF-870-CI-DRWG-30538 1 1
8 7 6 5 4 3 Printing: 02.02.2015

Вам также может понравиться