construction stage, Land area, for proposed development are 1.0 ha, hence it is become
suitable in used of control purpose.
Settling zone
Depth
Settling Zone, y1 1.00
Sediment Storage Zone, y2 0.8
Side Slope Z 1.5(H) :1(V)
Total Depth 1.80
SAY 1
Settling zone
hence,V2 4247.2
y2 > 0.3
V2 >4200 4247.2 ok !
Base:
WB = Wtwl - 2(d/tan45) 31.75 m
say 80 m
LB = Ltwl - 2 (d/tan45) 9.0887 m
say 300 m
Depth
Settling Zone, y1 2.50
Sediment Storage Zone, y2 2.1
Side Slope Z 1.5(H) :1(V)
Total Depth 4.60
SAY 2
The equation 13.2 shall be used to derived the design rainfall intensities
Calculation Average rainfall intesity (mm/hr) for 10 year ARI and 68 minute duration
Rainfall depth (mm) for various duration (minutes) from equation 13.3,
ARI (yrs) 30.00 60 120.00 180 P15 = P30 - FD(P60 - P30)
2 48.09 62.04527 75.65 82.9806 = 85.07 mm
5 58.10 76.26615 92.81 101.4244
10 64.56 85.07488 105.40 116.6321 Therefore ,
20 71.07 93.64202 116.50 129.4435 I15 = 204.18 mm/hr
50 79.54 105.2852 130.98 145.3933
100 88.46 116.3822 145.51 162.2951 C = 0.65
Q10 C.I.A/360
= 2.53637 cu.m/s
Losses
Orifice Discharge coefficient,Cd 0.62
entrance loss Factor,Ke 1.601457
Darcy-Weisbach fiction loss coefficient,f 0.02
Fiction Loss Factor.Kf 0.04708
Outlet loss factor, Ko 0.5
Bend Loss Factor,Kb 0
Frequency of Maintenance
Calculation of sediment loads
Example calculation
Weighted average annual runoff coefficient,Cv 0.4
Event Mean Concentration,EMC 4000
Average 6 month Rainfall depth 1841
Conclusion
The total sediment volume for Max. 6 month Rainthfall Depth arcordig to data provided from
JPS website (http :\\infobanjir.moa.my) are 82.48 m3 and it is less than quater of storage volume
of proposed sediment basin 1247 m3. Hence, it is safe to assumen that 6 month
maintenance are adequate to maintain the efficiency of the proposed wet sediment basin.
10
4. FREQUENCY OF MAINTENANCE
FINAL DISCHARGE AT QB
= 58.10 mm
V = 1 x R 2/3 x S 1/2
n
Therefore use temporary earthdrain with trapezoidal shape of 0.9m x 0.8m x 0.9m
4. FREQUENCY OF MAINTENANCE
FINAL DISCHARGE AT QC
= 49.56 mm
V = 1 x R 2/3 x S 1/2
n
Therefore use temporary earthdrain with trapezoidal shape of 0.9m x 0.8m x 0.9m
4. FREQUENCY OF MAINTENANCE
FINAL DISCHARGE AT QA
= 29.12 mm
V = 1 x R 2/3 x S 1/2
n
Therefore use temporary earthdrain with trapezoidal shape of 0.9m x 0.8m x 0.9m
0.02
20.31976
80