SR NO INSPECTION TEST PLAN NO.

ACTIVITIES / DISCRIPTION SUBMITTAL DATE

ARCHITECTURAL
0001 KHEP-CT-AR-0001-00

CIVIL
0001 KHEP-ITP-31-001-00 Inspection and Testing Plan for Earthworks 22-Jan-2017
0001.1 KHEP-ITP-31-001-01 Inspection and Testing Plan for Earthworks 6-Feb-2017

0002 KHEP-ITP-31-002-00 Inspection and Testing Plan for Termite Control 26-Jan-2017

0003 KHEP-ITP-CI-003-00 Inspection and Test Plan Masonry Units & Bricks 1-Apr-2017
Inspection and Test Plan Concrete Masonry Units & Building
0003.1 KHEP-ITP-CI-003-01 26-Apr-2017
Bricks-Sec 04 2000

0004 KHEP-ITP-CI-004-00 ITP for Cast in Place Portland Cement Concrete 30-Jan-2017

0005 KHEP-ITP-CI-005-00 ITP for Damproofing of concrete surface 8-Feb-2017


0006 KHEP-ITP-CI-006-00 Inspection and Test Plan Portland Cement 1-Apr-2017

0007 KHEP-ITP-CI-007-00 Inspection and Test Plan Joint Sealant-Sec.07 9200 12-Apr-2017

0008 KHEP-ITP-CI-008-00 Inspection and Test Plan Concrete Plant Management/Control 12-Apr-2017

Inspection and Test Plan Epoxy Grout & Cement Base Non-
0009 KHEP-ITP-CI-009-00 17-Apr-2017
Shrink Grout
Inspection and Test Plan Epoxy Grout & Cement Base Non-
009.1 KHEP-ITP-CI-009-01 26-Apr-2017
Shrink Grout

0010 KHEP-ITP-CI-010-00 Inspection & Plan Earth Work - for Under Ground Utilities 3-May-2017

0011 KHEP-ITP-CI-011-00 Inspection & Plan Waterproofing - Wet Areas 14-Aug-2017

0012 KHEP-ITP-CI-012-00 Inspection & Test Plan Architectural Painting - Internal External 21-Aug-2017

Inspection & Test Plan Gypsum Boards & Gypsum Plastering


0013 KHEP-ITP-CI-0013-00 13-Sep-2017
(Section: 09 2300, 09 2900)
Inspection & Test Plan Gypsum Boards & Gypsum Plastering
0013.1 KHEP-ITP-CI-0013-01 19-Sep-2017
(Section: 09 2300, 09 2900)

0014 KHEP-ITP-CI-0014-00 Inspection & Test Plan Tiling (Ceramic Wall and Floor Tiles) 18-Sep-2017

Inspection & Test Plan Building insulation & roofing system


0015 KHEP-ITP-CI-0015-00 19-Sep-2017
(Section: 07 2100, 07 5420)
Inspection & Test Plan Waterproofing of Roof Slab (Section: 07
0016 KHEP-ITP-CI-0016-00 24-Sep-2017
5200, 07 5420)
Inspection & Test Plan Doors and Windows (Section: 07
0017 KHEP-ITP-CI-0017-00 27-Sep-2017
5200, 07 5420)
Inspection & Test Road Signage and Signals (Section: 10
0018 KHEP-ITP-CI-0018-00 2-Oct-2017
1453)
Inspection & Test Permanent Road Marking (Section: 32
0019 KHEP-ITP-CI-0019-00 3-Oct-2017
1723)
Inspection & Test Asphalt concrete paving (Section: 32
0020 KHEP-ITP-CI-0020-00 5-Oct-2017
1122)
Inspection & Test Plan Asphalt concrete paving (Section: 32
0020.1 KHEP-ITP-CI-0020-01 7-Nov-2017
1216, 321122 & 321123)
Inspection & Test Plan Asphalt concrete paving (Section: 32
0020.2 KHEP-ITP-CI-0020-02 16-Nov-2017
1216, 321122 & 321123)

0021 KHEP-ITP-CI-0021-00 Inspection & Test Precast concrete Element (Section: 32 1122) 10-Oct-2017

0022 KHEP-ITP-CI-0022-00 Inspection & Test Plan Metal Works - For Buildings 17-Oct-2017
0023 KHEP-ITP-CI-0023-00 Inspection & Test Building Furnishings works 18-Oct-2017

ELECTRICAL
Inspection & Test Plan Above Grade Conduit. Fittings &
0001 KHEP-ITP-EL-0001-00 13-May-2017
Accessories Sec. 26 0534
Inspection & Test Plan Below Grade Conduit & Duct Bank Sec.
0002 KHEP-ITP-EL-0002-00 13-May-2017
26 0510, 0534 & 0553
Inspection & Test Plan Boxes (Junction, Terminal and Pull) Wire
0003 KHEP-ITP-EL-0003-00 31-May-2017
Troughs and Wire ways Division 26
0004 KHEP-ITP-EL-0004-00 Inspection & Test Plan Wiring Devices Division 26 2726 3-Jun-2017
Inspection & Test Plan Grounding & Bonding for Electrical
0005 KHEP-ITP-EL-0005-00 14-Aug-2017
System Sec. 26 00526, 27 0526
Inspection & Test Plan Grounding & Bonding for Electrical
0005.1 KHEP-ITP-EL-0005-01 11-Sep-2017
System Sec. 26 00526, 27 0526
Inspection & Test Plan Low Voltage Cable & Wire Sec. 26 00519,
0006 KHEP-ITP-EL-0006-00 30-Aug-2017
26 0553
Inspection & Test Plan Internal Lighting System (Section: 26
0007 KHEP-ITP-EL-0007-00 13-Sep-2017
5100)
Inspection & Test Plan Exterior Lighting System (Section: 26
0008 KHEP-ITP-EL-0008-00 3-Oct-2017
5610)

0009 KHEP-ITP-EL-0009-00 Inspection & Test Plan Panel Board (Section: 26 2416) 7-Oct-2017

0010 KHEP-ITP-EL-0010-00 Inspection & Test Plan Electric Meter (Section: 26 2714) 10-Oct-2017

Inspection & Test Plan Enclosed & Disconnect Switch Systems


0011 KHEP-ITP-EL-0011-00 23-Nov-2017
(Section: 26 2818 & 26 2819)
Inspection & Test Plan Medium Voltage Ring Main Unit (Section:
0012 KHEP-ITP-EL-0012-00 20-Dec-2017
26 1327)
Inspection & Test Plan Medium Voltage Ring Main Unit (Section:
0012.1 KHEP-ITP-EL-0012-01 24-Jan-2018
26 1327)
Inspection & Test Plan Medium Voltage Cable & Conductors
0013 KHEP-ITP-EL-0013-00 7-Jan-2018
(Section: 26 0513 & 26 0543)

HVAC
Inspection & Test Plan HVAC Metal Duct System Sec. 23 3300,
0001 KHEP-ITP-HVAC-0001-00 14-May-2017
0528 & 0713
Inspection & Test Plan HVAC - Exhaust Fan System Sec. 23
0002 KHEP-ITP-HVAC-0002-00 22-May-2017
3413
Inspection & Test Plan Testing Adjesting & Balancing HVAC
0003 KHEP-ITP-HVAC-0003-00 29-Jan-2018
System sec 23 0593
Inspection & Test Plan HVAC - Air Outlet & Inlet (Air handing
0004 KHEP-ITP-HVAC-0004-00 29-Jan-2018
unit AHU) sec 23 7412

0005 KHEP-ITP-HVAC-0005-00 Inspection & Test Plan - Air Cooled VRV Systems Sec 23 8129 19-Feb-2018

MECHANICAL
Inspection and Testing Plan for Gravity Sanitary Sewer and
0001 KHEP-ITP-33-0001-00 28-Jan-2017
Storm Water Drainage

ITP for Combined Fire-Potable Water Distribution Piping System


0002 KHEP-ITP-ME-0002-00 15-Feb-2017
(Upstream & Downstream of Isolation Valve ans its Supports.

Combined Fire-Potable Water Distribution Piping System


0002.1 KHEP-ITP-ME-0002-01 25-Feb-2017
(Upstream & Downstream of Isolation Valve) and its Supports.

0003 KHEP-ITP-ME-0003-00 Inspection and Testing Plan Hydro static Testing - All Application 4-Jun-2017

0004 KHEP-ITP-ME-0004-00 Inspection and Testing Plan Metallic Piping Installation 21-Aug-2017

0004.1 KHEP-ITP-ME-0004-01 Inspection & Test Plan Metallic Piping Installation & Testing 13-Sep-2017

0005 KHEP-ITP-ME-0005-00 Inspection & Test Plan Welding of On-Plot Piping 18-Sep-2017
0006 KHEP-ITP-ME-0006-00 Inspection & Test Plan Irrgation system & Piping 19-Sep-2017
0006.1 KHEP-ITP-ME-0006-01 Inspection & Test Plan Irrigation system & Piping 11-Oct-2017

LOW CURRENT (TELECOM)


Inspection & Test Plan Grounding & Bonding for Communication
0001 KHEP-ITP-LC-0001-00 13-May-2017
System - Sec.27 0526
Inspection & Test Plan Grounding & Bonding for Communication
0001.1 KHEP-ITP-LC-0001-01 31-May-2017
System - Sec.27 0526
Inspection & Test Plan Fire Detection and Alarm System -Sec.
0002 KHEP-ITP-LC-0002-00 13-May-2017
28 3115
Inspection & Test Plan Fire Detection and Alarm System -Sec.
0002.1 KHEP-ITP-LC-0002-01 20-Nov-2017
28 3115
Inspection & Test Plan Building Premises Distribution System
0003 KHEP-ITP-LC-0003-00 31-May-2017
Division 27
Inspection & Test Plan Outside Plant (OSP) Duct bank System
0004 KHEP-ITP-LC-0004-00 21-Jun-2017
Sec.338126

0005 KHEP-ITP-LC-0005-00 Inspection & Test Plan IP CCTV System (Division 28 0513) 20-Dec-2017

Inspection & Test Plan Communication Cabinets and Racks


0006 KHEP-ITP-LC-0006-00 20-Dec-2017
(Division 27 1116)
Inspection & Test Plan Communications Optical Fiber System
0007 KHEP-ITP-LC-0007-00 7-Jan-2018
(Division 27 1323)
Inspection & Test Plan Communications Copper Horizonal
0008 KHEP-ITP-LC-0008-00 22-Jan-2018
Cabling (Division 27 1513)

PLUMBING
Inspection & Test Plan Bulding Drain & Drainage Piping Sec. 22
0001 KHEP-ITP-PL-0001-00 13-May-2017
1424 & 23 0528
Inspection & Test Plan Roof Drain & Drainage Piping Sec. 22
0002 KHEP-ITP-PL-0002-00 13-May-2017
1424 & 23 0528
0003 KHEP-ITP-PL-0003-00 Instection & Test Plan Plumbing Fixtures Sec.22 400 13-May-2017
Instection & Test Plan Electric Water Heater Sec. 22 3000 &
0004 KHEP-ITP-PL-0004-00 13-May-2017
22 0525

0005 KHEP-ITP-PL-0005-00 Inspection & Test Plan Building Sprinkler and Standpipe System 24-Sep-2017

Inspection & Test Plan Domestic Water Distribution System


0006 KHEP-ITP-PL-0006-00 18-Oct-2017
(Inside Buildings) Sections 221114 & 220525

STRUCTURAL
0001 KHEP-ITP-ST-0001-00
A Approved

B Approved w/ Comments

C Revise & Resubmit

E Rejected
SUBMITTED FOR RESPONDED AS
DISCIPLINE DATE RESPONDED INTERNEL REFERENCE NO
CODE STATUS CODE STATUS

Architectural

Civil 1 Approval 30-Jan-2017 C Revise & Resubmit KITP-A-001


Civil 1 Approval 8-Feb-2017 A Approved KITP-A-001-01
Approved w/
Civil 1 Approval 30-Jan-2017 B Comments
KITP-M-002

Civil 1 Approval 5-Apr-2017 C Revise & Resubmit KITP-M-005

Civil 1 Approval 7-May-2017 A Approved KITP-M-005-01

Approved w/
Civil 1 Approval 31-Jan-2017 B Comments
KITP-Q-004

Civil 1 Approval 12-Feb-2017 A Approved KITP-H-003


Civil 1 Approval 6-Apr-2017 A Approved KITP-M-013

Civil 1 Approval 17-Apr-2017 A Approved KITP-Q-023-01

Civil 1 Approval 17-Apr-2017 A Approved KITP-Q-020-01

Civil 1 Approval 23-Apr-2017 C Revise & Resubmit KITP-Q-020-01

Civil 1 Approval 4-May-2017 A Approved KITP-Q-020-01

Civil 1 Approval 20-May-2017 A Approved KITP-S-007-00

Civil 1 Approval 19-Aug-2017 A Approved KITP-M-004-00

Civil 1 Approval 26-Aug-2017 A Approved KITP-H-0012-00

Civil 1 Approval 19-Sep-2017 C Revise & Resubmit KITP-M-100-05

Civil 1 Approval 24-Sep-2017 A Approved KITP-M-100-05

Civil 1 Approval 20-Sep-2017 A Approved KITP-M-100-06

Civil 1 Approval 24-Sep-2017 A Approved KITP-M-021

Civil 1 Approval 27-Sep-2017 A Approved KITP-M-100-02

Civil 1 Approval 3-Oct-2017 A Approved KITP-M-100-07

Civil 1 Approval 3-Oct-2017 A Approved KITP-R-006

Civil 1 Approval 7-Oct-2017 A Approved KITP-H-005

Civil 1 Approval 10-Oct-2017 C Revise & Resubmit KITP-Q-009

Civil 1 Approval 13-Nov-2017 C Revise & Resubmit KITP-M-100-2

Civil 1 Approval 28-Nov-2017 E Rejected KITP-M-100-2

Civil 1 Approval 12-Oct-2017 A Approved KITP-Q-011

Civil 1 Approval 23-Oct-2017 A Approved KITP-M-100-03


Civil 1 Approval 23-Oct-2017 A Approved KITP-M-012
Electrical 1 Approval 30-May-2017 A Approved BKITP-E-001-00

Electrical 1 Approval 30-May-2017 A Approved BKITP-E-002-00

Electrical 1 Approval 3-Jun-2017 A Approved BKITP-E-003-00

Electrical 1 Approval 8-Jun-2017 A Approved BKITP-E-004-00

Electrical 1 Approval 20-Aug-2017 C Revise & Resubmit BKITP-E-005-00

Approved w/
Electrical 1 Approval 30-Sep-2017 B Comments
BKITP-EL-005

Approved w/
Electrical 1 Approval 21-Sep-2017 B Comments
BKITP-E-006-00

Approved w/
Electrical 1 Approval 20-Sep-2017 B Comments
KITP-EL-007

Approved w/
Electrical 1 Approval 9-Oct-2017 B Comments
KITP-EL-008

Approved w/
Electrical 1 Approval 17-Oct-2017 B Comments
BKITP-EL-009

Approved w/
Electrical 1 Approval 17-Oct-2017 B Comments
BKITP-EL-010

Approved w/
Electrical 1 Approval 23-Dec-2017 B Comments
KITP-EL-011

Electrical 1 Approval 9-Jan-2018 C Revise & Resubmit KITP-EL-012

Electrical 1 Approval 13-Feb-2018 C Revise & Resubmit KITP-EL-012-01

Electrical 1 Approval 9-Jan-2018 C Revise & Resubmit KITP-EL-013

HVAC 1 Approval 25-May-2017 A Approved KITP-H-001

HVAC 1 Approval 1-Jun-2017 A Approved KITP-H-002

HVAC 1 Approval 6-Feb-2018 C Revise & Resubmit KITP-K-01-012

HVAC 1 Approval 3-Feb-2018 C Revise & Resubmit KITP-H-004-00

HVAC 1 Approval KITP-H-005-00

Mechanical 1 Approval 1-Feb-2017 A Approved KITP-S-010-01

Mechanical 1 Approval 19-Feb-2017 C Revise & Resubmit KITP-S-005-00

Mechanical 1 Approval 1-Mar-2017 A Approved KITP-S-005-01

Mechanical 1 Approval 8-Jun-2017 A Approved BKITP-ME-003-00

Mechanical 1 Approval 29-Aug-2017 C Revise & Resubmit KITP-H-0011-00

Mechanical 1 Approval 19-Sep-2017 A Approved KITP-L-350-01

Mechanical 1 Approval 20-Sep-2017 A Approved KITP-L011-00


Mechanical 1 Approval 30-Sep-2017 C Revise & Resubmit KITP-S-007-00
Mechanical 1 Approval 16-Oct-2017 A Approved KITP-S-007-01

Low Current 1 Approval 20-May-2017 C Revise & Resubmit BKITP-TE-001-00

Approved w/
Low Current 1 Approval 12-Jun-2017 B Comments
BKITP-LC-001-01

Low Current 1 Approval 20-May-2017 C Revise & Resubmit BKITP-TE-014-00


Approved w/
Low Current 1 Approval 26-Nov-2017 B Comments
BKITP-TE-014-01

Low Current 1 Approval 14-Jun-2017 A Approved BKITP-LC-003-00

Low Current 1 Approval 6-Jul-2017 C Revise & Resubmit BKITP-LC-004-00

Approved w/
Low Current 1 Approval 23-Jan-2018 B Comments
BKITP-T-005-00

Approved w/
Low Current 1 Approval 27-Dec-2017 B Comments
BKITP-T-008-00

Low Current 1 Approval 11-Jan-2018 C Revise & Resubmit BKITP-T-002-00

Low Current 1 Approval 31-Jan-2018 A Approved BKITP-T-007-00

Plumbing 1 Approval 25-May-2017 A Approved BKITP-S-004-00

Plumbing 1 Approval 25-May-2017 A Approved BKITP-S-004-00

Plumbing 1 Approval 25-May-2017 A Approved BKITP-S-008-00

Plumbing 1 Approval 25-May-2017 A Approved BKITP-S-002-00

Plumbing 1 Approval 7-Oct-2017 C Revise & Resubmit KITP-S-050-01

Approved w/
Plumbing 1 Approval 25-Oct-2017 B Comments
KITP-S-040-01
REMARKS COMMENTS

Closed
Closed

Closed

Closed

Closed

Closed

Closed
Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed
Closed
Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Open

Closed

Closed

Closed

Closed

Closed

Closed

Closed
Closed
Closed

Closed

Closed

Closed
Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed
SR NO METHOD OF STATEMENT NO. ACTIVITIES / INSPECTION ITEMS

ARCHITECTURAL
0001 KHEP-MOS-AR-0001-00 Method of Statement for Portland Cement Plastering
0002 KHEP-MOS-AR-0002-00 Method of Statement for CMU - Block Work
0003 KHEP-MOS-AR-0003-00 Method of Statement for Water Proofing for Wet Areas

CIVIL
0000 KHEP-MS-01-0001-00 Method of Statement for Site Works

0000 KHEP-MS-32-0001-00 Method of Statement for Road Network

0001 KHEP-MS-32-0002-00 Method of Statement for Landscape and Hardscape

0002 KHEP-MS-33-0001-00 Method of Statement for Storm Water Drainage System

0002.1 KHEP-MOS-CI-0001-01 Method of Statement of Storm Drainage

0003 KHEP-MS-33-0002-00 Method of Statement for Sanitary Sewage System

0003.1 KHEP-MOS-CI-0002-01 Method of Statement of Sanitary Sewer

0003.2 KHEP-MOS-CI-0002-02 Method of Statement of Sanitary Sewer

Method of Statement For Temporary potable water Connection


0004 KHEP-MOS-CI-0003-00
From Fire Hydrant

0005 KHEP-MS-33-0004-00 Method of Statement for Irrigation System

0005 KHEP-MOS-CI-0005-00 Method of Statement for Backfilling of footings foundation

0005.1 KHEP-MOS-CI-0005-01 Method of Statement for Backfilling of Footings Foundation

0005.2 KHEP-MOS-CI-0005-02 Method of Statement for Back filling of Footings Foundation

0005.3 KHEP-MOS-CI-0005-03 Method of Statement for Back filling of Footings Foundation

0006 KHEP-MOS-CI-0006-00 Method of Statement for Termite Control

Method Statement for concrete Manhole Installation of storm


0007 KHEP-MOS-CI-0007-00
Drainage System with casting Yard Layout

Method Statement for GRP Cutting (Pipes and Openings in


0008 KHEP-MOS-CI-0008-00
Manhole shaft)

0009 KHEP-MOS-CI-0009-00 Method of Statement for Gravity Testing Of Storm Drainage Pipes

0009.1 KHEP-MOS-CI-0009-01 Method of Statement for Gravity Testing Of Storm Drainage Pipes

0010 KHEP-MOS-CI-0010-00 Method of Statement for Leak Test of Sanitary GRP Manholes

0010.1 KHEP-MOS-CI-0010-01 Method of Statement for Leak Test of Sanitary GRP Manholes

0011 KHEP-MOS-CI-0011-00 Method of Statement for Mobilization

0012 KHEP-MOS-CI-0012-00 Method of Statement for Trench Excavation

0013 KHEP-MOS-CI-0013-00 Method of Statement of Tie in of potable network system


0013.1 KHEP-MOS-CI-0013-01 Method of Statement of Tie in of Potable

Method of Statement for Leak (Exfiltration) Test of Storm


0014 KHEP-MOS-CI-0014-00
Drainage System

ELECTRICAL
0001 KHEP-MS-26-0001-00 Method of Statement for Electrical Power Works

0002 KHEP-MS-26-0002-00 Method of Statement for Outdoor Lighting Works

0003 KHEP-MOS-EL-0003-00 Method of Statement For MV Cable

0003.1 KHEP-MOS-EL-0003-01 Method of Statement For MV Cable

0004 KHEP-MOS-EL-0004-00 Method of Statement For LV Cable

0004.1 KHEP-MOS-EL-0004-01 Method of Statement For LV Cable

HVAC
0001 KHEP-MOS-HVAC-0001-00 Method of Statement of VRF System

MECHANICAL
0001 KHEP-MS-33-0003-00 Method of Statement for Potable Water and Fire Fighting System

0001.1 KHEP-MOS-ME-0001-01 Method of Statement Potable Network System

0002 KHEP-MOS-ME-0002-00 Method of Statement Fire Fighting Network System

0003 KHEP-MOS-ME-0003-00 Method of Statement Building Fire Fighting System

LOW CURRENT (TELECOM)


0001 KHEP-MS-27-0001-00 Method of Statement for Communication Networks

0002 KHEP-MOS-LC-0002-00 Method of Statement for Communication Under ground Ducts

PLUMBING
Method of Statement for Drainage Pipe Installation Inside The
0001 KHEP-MOS-PL-0001-00
Toilet

0002 KHEP-MOS-PL-0002-00 Method of Statement for Building Drainage System

0002.1 KHEP-MOS-PL-0002-01 Method of Statement for Building Drainage System

STRUCTURAL
0001 KHEP-MOS-ST-0001-00 Method of Statement for Placing Concrete & Shoring

0001.1 KHEP-MOS-ST-0001-01 Method Statement for placing concrete & shoring

0002 KHEP-MOS-ST-0002-00 Method of Statement for Concrete Repair

0003 KHEP-MOS-ST-0003-00 Method of Statement for Water Curing

0004 KHEP-MOS-ST-0004-00 Method of Statement for Scaffolding Dismantling

0004.1 KHEP-MOS-ST-0004-01 Method of Statement for Scaffolding Dismantling


0004.2 KHEP-MOS-ST-0004-02 Method of Statement for Scaffolding Dismantling
0005 KHEP-MOS-ST-0005-00 Method of Statement for Large Scale Concrete Repair

0006 KHEP-MOS-ST-0006-00 Method of Statement for Provide New Opening in Concrete Slab

0006.1 KHEP-MOS-ST-0006-01 Method of Statement for Provide New Opening in Concrete Slab

0006.2 KHEP-MOS-ST-0006-02 Method of Statement for Provide New Opening in Concrete Slab

Method of Statement for Adhesive Epoxy and/or Cementitious for


0007 KHEP-MOS-ST-0007-00 Anchoring Meterial Into Dowel Bar/Tierod Embedded on Poured
Concrete Structure
A Approved

B Approved w/ Comments

C Revise & Resubmit

E Rejected
SUBMITTED FOR RESPONDED AS
SUBMITTED DATE DISCIPLINE DATE RESPONDED
CODE STATUS CODE STATUS

22-May-2017 Architectural 1 Approval 13-Jun-2017 A Approved


4-Jul-2017 Architectural 1 Approval 12-Jul-2017 A Approved
28-Sep-2017 Architectural 1 Approval 7-Oct-2017 A Approved

22-Jan-2017 Civil 1 Approval 30-Jan-2017 A Approved


Revise &
15-Jan-2017 Civil 1 Approval 29-Jan-2017 C Resubmit
Revise &
24-Jan-2017 Civil 1 Approval 1-Feb-2017 C Resubmit
Revise &
15-Jan-2017 Civil 1 Approval 28-Jan-2017 C Resubmit
3-May-2017 Civil 1 Approval 23-May-2017 A Approved
Revise &
15-Jan-2017 Civil 1 Approval 28-Jan-2017 C Resubmit
Revise &
12-Apr-2017 Civil 1 Approval 16-Apr-2017 C Resubmit
Approved
1-May-2017 Civil 1 Approval 10-May-2017 B w/
Comments
Approved
3-Dec-2017 Civil 1 Approval 6-Dec-2017 B w/
Comments
Revise &
22-Jan-2017 Civil 1 Approval 31-Jan-2017 C Resubmit
Revise &
1-May-2017 Civil 1 Approval 15-May-2017 C Resubmit
Revise &
1-Jun-2017 Civil 1 Approval 12-Jun-2017 C Resubmit
Revise &
21-Jun-2017 Civil 1 Approval 4-Jul-2017 C Resubmit
9-Jul-2017 Civil 1 Approval 11-Jul-2017 A Approved
Approved
22-May-2017 Civil 1 Approval 6-Jun-2017 B w/
Comments

10-Aug-2017 Civil 1 Approval 14-Aug-2017 A Approved

Approved
3-Oct-2017 Civil 1 Approval 9-Oct-2017 B w/
Comments
Revise &
20-Dec-2017 Civil 1 Approval 23-Dec-2017 C Resubmit

24-Dec-2017 Civil 1 Approval 25-Dec-2017 A Approved

Revise &
8-Jan-2018 Civil 1 Approval 9-Jan-2018 C Resubmit
Approved
10-Jan-2018 Civil 1 Approval 11-Jan-2018 B w/
Comments
Approved
2-Feb-2017 Civil 1 Approval 9-Feb-2017 B w/
Comments
30-Mar-2017 Civil 1 Approval 5-Apr-2017 E Rejected
Revise &
24-Apr-2017 Civil 1 Approval 6-May-2017 C Resubmit
Approved
9-May-2017 Civil 1 Approval 30-May-2017 B w/
Comments
Approved
15-Jan-2018 Civil 1 Approval 16-Jan-2018 B w/
Comments

Approved
22-Jan-2017 Electrical 1 Approval 31-Jan-2017 B w/
Comments
Approved
24-Jan-2017 Electrical 1 Approval 31-Jan-2017 B w/
Comments
Revise &
30-Apr-2017 Electrical 1 Approval 17-May-2017 C Resubmit
20-May-2017 Electrical 1 Approval 22-May-2017 A Approved
Revise &
8-May-2017 Electrical 1 Approval 22-May-2017 C Resubmit
24-May-2017 Electrical 1 Approval 25-May-2017 A Approved

Revise &
8-Feb-2018 HVAC 1 Approval 20-Feb-2018 C Resubmit

Revise &
22-Jan-2017 Mechanical 1 Approval 31-Jan-2017 C Resubmit
Approved
7-Oct-2017 Mechanical 1 Approval 11-Oct-2017 B w/
Comments
Approved
7-Oct-2017 Mechanical 1 Approval 26-Oct-2017 B w/
Comments
Approved
23-Jan-2018 Mechanical 1 Approval 1-Feb-2018 B w/
Comments

Approved
22-Jan-2017 Telecom 1 Approval 31-Jan-2017 B w/
Comments
Approved
22-Jul-2017 Telecom 1 Approval 27-Sep-2017 B w/
Comments

Revise &
22-May-2017 Plumbing 1 Approval 1-Jun-2017 C Resubmit
Revise &
22-Oct-2017 Plumbing 1 Approval 25-Oct-2017 C Resubmit
Approved
11-Feb-2018 Plumbing 1 Approval 13-Feb-2018 B w/
Comments

Revise &
30-Mar-2017 Structural 1 Approval 4-Apr-2017 C Resubmit
Approved
24-Apr-2017 Structural 1 Approval 6-May-2017 B w/
Comments
3-May-2017 Structural 1 Approval 17-May-2017 A Approved
Approved
22-May-2017 Structural 1 Approval 3-Jun-2017 B w/
Comments
Revise &
13-Jul-2017 Structural 1 Approval 20-Jul-2017 C Resubmit
Revise &
27-Jul-2017 Structural 1 Approval 31-Jul-2017 C Resubmit
9-Aug-2017 Structural 1 Approval 12-Aug-2017 A Approved
26-Dec-2017 Structural 1 Approval 28-Dec-2017 A Approved
Revise &
26-Dec-2017 Structural 1 Approval 28-Dec-2017 C Resubmit
Revise &
1-Jan-2018 Structural 1 Approval 4-Jan-2018 C Resubmit

11-Jan-2018 Structural 1 Approval 16-Jan-2018 A Approved

19-Feb-2018 Structural 1 Approval 21-Feb-2018 A Approved


Approved

Approved w/ Comments
Revise & Resubmit
Rejected

INTERNEL REFERENCE NO REMARKS COMMENTS

KHEP-MOS-AR-0001-00 Closed
KHEP-MOS-AR-0002-00 Closed
KHEP-MOS-AR-0003-00 Closed

KHEP-MS-RD-0001 Closed

KHEP-MS-RD-1001-R00 Closed

KHEP-MS-LH-0001 Closed

KHEP-MS-SD-001-R00 Closed

KHEP-MS-33-0001-00 Closed

KHEP-MS-SS-001-R00 Closed

KHEP-MS-33-0002-00 Closed

KHEP-MS-33-0002-00 Closed

KHEP-MOS-CI-0003-00 Closed

KHEP-MS-IR-001 Closed

KHEP-MOS-CI-0005-00 Closed

KHEP-MOS-CI-0005-01 Closed

KHEP-MOS-CI-0005-02 Closed

KHEP-MOS-CI-0005-03 Closed

KHEP-MOS-CI-0006-00 Closed

KHEP-MOS-CI-0007-00 Closed

KHEP-MOS-CI-0008-00 Closed

KHEP-MOS-CI-0009-00 Closed

KHEP-MOS-CI-0009-01 Closed

KHEP-MOS-CI-0010-00 Closed

KHEP-MOS-CI-0010-01 Closed

KHEP-MS-MB-0001 Closed

KHEP-MS-TE-0012 Closed

KHEP-MOS-CI-0013-00 Closed
KHEP-MOS-CI-0013-01 Closed

KHEP-MOS-CI-0014-00 Closed

KHEP-MS-LMV-001 Closed

KHEP-MS-LW-0001 Closed

KHEP-MOS-EL-0003-00 Closed

KHEP-MOS-EL-0003-01 Closed

KHEP-MOS-EL-0004-00 Closed

KHEP-MOS-EL-0004-01 Closed

KHEP-MOS-HVAC-0001-00 Closed

KHEP-MS-PF-001 Closed

KHEP-MOS-ME-0001-01
Note KHEP-MS-33-0003-00 as Closed
Rev 0

KHEP-MOS-ME-0002-00 Closed

KHEP-MOS-ME-0003-00 Closed

KHEP-MS-CN-001 Closed

KHEP-MOS-LC-0002-00 Closed

KHEP-MOS-PL-0001-00 Closed

KHEP-MOS-PL-0002-00 Closed

KHEP-MOS-PL-0002-01 Closed

KHEP-MOS-ST-0001-00 Closed

KHEP-MOS-ST-0001-01 Closed

KHEP-MOS-ST-0002-00 Closed

KHEP-MOS-ST-0003-00 Closed

KHEP-MOS-ST-0004-00 Closed

KHEP-MOS-ST-0004-01 Closed
KHEP-MOS-ST-0004-02 Closed
KHEP-MOS-ST-0005-00 Closed

KHEP-MOS-ST-0006-00 Closed

KHEP-MOS-ST-0006-01 Closed

KHEP-MOS-ST-0006-02 Closed

KHEP-MOS-ST-0007-00 Closed
SR NO MATERIAL SUBMISSION NO. ACTIVITIES / INSPECTION ITEMS MANUFACTURER

ARCHITECTURAL 1.Waterproofing Membrane & Sheet Materials

0001 KHEP-MS-AR-0001-00 2. Primer Technobit

3.Bituminous Damp-Proofing
1. Hollow concrete Block 100mm x 200mm x
400mm
Saudi Ready Mix
0002 KHEP-MS-AR-0002-00
2. Hollow concrete Block 150mm x 200mm x Concrete Co. Ltd.
400mm

3. Hollow concrete Block 200mm x 200mm x


SAPPCO-TEXACO
0003 KHEP-MS-AR-0003-00 Thermal Insulation Board; Polyurethane Insuation Products
Co. Ltd.

ALAMDAR
0004 KHEP-MS-AR-0004-00 Thermal Insulation Board; Polyurethane
VAPOTHERM CO. LTD
Masonry Units

1. Hollow concrete Block 100mm x 200mm x


400mm
Sulieman A. R.
0005 KHEP-MS-AR-0005-00
Namlah Factory
2. Hollow concrete Block 150mm x 200mm x
400mm
3. Hollow concrete Block 200mm x 200mm x
400mm
Middle East Metal &
Hollow Metal Doors & Frames (Fire Rated) (Option Wood Industries co.
0006 KHEP-MS-AR-0006-00
1) Ltd. (METALCO) -
Riyadh

Rollc For Trading Co.


0007 KHEP-MS-AR-0007-00 Overhead Coiling Doors (Option 1)
Ltd. Jeddah
Residential Casework

1. Kitchen Cabinet
Al Bawani Casework
0008 KHEP-MS-AR-0008-00 2. Vanity Cabinet
factory Riyadh, KSA
3. Built-In Cabinet

4- Pantry Cabinet

Residential Casework

1. Kitchen Cabinet
Al Bawani Casework
0008.1 KHEP-MS-AR-0008-01 2. Vanity Cabinet
factory Riyadh, KSA
3. Built-In Cabinet

4- Pantry Cabinet

Residential Casework

1. Kitchen Cabinet
Al Bawani Casework
0008.2 KHEP-MS-AR-0008-02 2. Vanity Cabinet
factory Riyadh, KSA
3. Built-In Cabinet

4- Pantry Cabinet
Metal Lath
Isam Kabbani &
0009 KHEP-MS-AR-0009-00
Partners Jeddah, KSA
1. Plastering Accessories

Unit Masonry Isam Kabbani &


0010 KHEP-MS-AR-0010-00
(1.Masonry Accessories) Partners Jeddah, KSA

Profils Systemes
0011 KHEP-MS-AR-0011-00 Aluminum Window
(Toundra)

Aluminum Window
PPG Industries Inc.
0012 KHEP-MS-AR-0012-00 1. Glaze fo Aluminum Windows Dow Corning
(Sealant)
2. Sealant
Metal Fabrication
RAMZ CO. FOR
METAL IND. Riyadh,
1.G.I. Steel Ladder Cage
0013 KHEP-MS-AR-0013-00 KSA
Al Jazeera Paints -
2.Paint-Primer and Top Coat
(Primer & Top Coat)
Metal Fabrication
RAMZ CO. FOR
METAL IND. Riyadh,
1.Galvanized Steel ladder Safety Cage
0013.1 KHEP-MS-AR-0013-01 KSA
Al Jazeera Paints -
2.Paint-Primer and Top Coat (Epoxy)
(Primer & Top Coat)
Aluminum Window
Guardian Sunguard
1. Glaze fo Aluminum Windows
0014 KHEP-MS-AR-0014-00 Dow Corning
(Sealant)
2. Sealant

ALUMINUM WINDOWS
1. GLAZE FOR ALUMINUM WINDOW
SAMPLES:
1. 6mm LIGHT GREY GLASS + 6mm CLIMA
GUARD
0014.1 KHEP-MS-AR-0014-01 NEUTRAL 70 LOW E GLASS + SPACER 12mm Guardian Sunguard
2. 6mm BRONZE GLASS + 6mm CLIMA GUARD
NEUTRAL 70 LOW E GLASS + SPACER 12mm

Railings:
RAMZ CO. FOR
1. Galvanized Steel Staircase Railing
METAL IND. Riyadh,
2. Galvanized
0015 KHEP-MS-AR-0015-00 KSA
Steel Hand Railing
Al Jazeera Paints -
3. Galvanized Steel Balcony Guard Railing
(Primer & Top Coat)
4. Paints - Primer & Top Coat

Railings:
RAMZ CO. FOR
1. Galvanized Steel Staircase Railing
METAL IND. Riyadh,
2. Galvanized
0015.1 KHEP-MS-AR-0015-01 KSA
Steel Hand Railing
Al Jazeera Paints -
3. Galvanized Steel Balcony Guard Railing
(Primer & Top Coat)
4. Paints - Primer & Top Coat

GYPSUM BOARD
1. GYPSUM BOARD 12.5mm MOISTURE
RESISTANT
2. GYPSUM BOARD 16mm MOISTURE RESISTANT
Mada Gypsum Yanbu,
0016 KHEP-MS-AR-0016-00 3. GYPSUM BOARD 12.5mm 2HRS FIRE
KSA
RESISTANT
4. GYPSUM BOARD 16mm 2HRS FIRE RESISTANT
5. GYPSUM BOARD 12.5mm 2HRS FIRE
RESISTANT

Western Burkani Block


0017 KHEP-MS-AR-0017-00 Masonry Units
Factory
Masonry Units
1. Hollow concrete Block 100mm x
200mm x 400mm Ali Almsaad Co. For
0018 KHEP-MS-AR-0018-00 2. Hollow concrete Block 150mm x Producing Building
200mm x 400mm Materials (ABNI)
3. Hollow concrete Block 200mm x
200mm x 400mm (With Sample)

Masonry Units

1. Hollow concrete Block 100mm x 200mm x


400mm
KNF Block Factory
0019 KHEP-MS-AR-0019-00
2. Hollow concrete Block 150mm x 200mm x Jeddah, KSA
400mm

3. Hollow concrete Block 200mm x 200mm x


400mm (With Sample)

Non-Strutural Metal Framing


1. Metal Partition
USG Middle East, Ltd
0020 KHEP-MS-AR-0020-00 2. Ceiling
Jeddah, Saudi Arabia
framing
3. Framing Accessories

Waterproofing System
1. Waterproofing Membrane -
Insuwrap PVC 2000 WMR
2.
Thermal Insulation
3. Geotextile
0021 KHEP-MS-AR-0021-00 See Attached Sheet
4.
Polyethylene Sheet
5. Aluminium Flashing
6.Polyurethane
Sealant
(With Samples)
Roof Waterproofing System
1. GS
Primer - D41
2. Waterproofing Membrane - GS
0021.1 KHEP-MS-AR-0021-01 Gulf Seal
Plasto 4G
3.Waterproofing Membrane - GS Plasto 4F
(With Samples)

Roof Waterproofing System


0021.2 KHEP-MS-AR-0021-02 1. Alyap
Drainage Panel - Alfdrain CP20

1. CC Technique-Arcel
SP20
2.DWI-
Derma Primer
3.DWI-Derma 4170-
4170SL
Roof Waterproofing System:
0022 KHEP-MS-AR-0022-00 4.ATCO-
(With Samples)
Separation
Sheet(Polyethylene)
5.SAPTEX-Extruded
polystyrene Insulation
Boards
6.Bonar Natpet
1. CC Technique-Arcel
SP20
2.AWAZEL- Py
Membranes
PY40200E-
PY40200EM
Roof Waterproofing System:
0023 KHEP-MS-AR-0023-00
(With Samples) 3.ATCO-
Separation
Sheet(Polyethylene)
4.SAPTEX-Extruded
polystyrene Insulation
Boards
5.ALYAF

GYPSUM BOARD
1. GYPSUM BOARD 12.5mm MOISTURE
RESISTANT UNITED MINING
0024 KHEP-MS-AR-0024-00 2. GYPSUM BOARD 16mm MOISTURE RESISTANT INDUSTRIES
3. GYPSUM BOARD 12.5mm 1HR FIRE RESISTANT JEDDAH, KSA
4. GYPSUM BOARD 15mm 1HR FIRE RESISTANT
5. JOINT TAPE & JOINT COMPOUND

Wet Area Waterproofing System:


0025 KHEP-MS-AR-0025-00 DWI-DERMA
(With Samples)

PAINTINGS
1. INTERIOR PAINT SYSTEM AL JAZEERA PAINTS
0026 KHEP-MS-AR-0026-00
2. POLYURETHANE PAINT SYSTEM FOR WOOD JEDDAH,KSA
3. EPOXY FLOORING PAINT SYSTEM

Tile Adhesive - Sikaceram 102 Sika Saudi Arabia Co.


0027 KHEP-MS-AR-0027-00
(Water Resistant Tile Adhesive) Ltd.

Tile Adhesive - Sikaceram 202 Sika Saudi Arabia Co.


0028 KHEP-MS-AR-0028-00
(Water Resistant Tile Adhesive) Ltd.

Tile Adhesive - Sikaceram 502TG Sika Saudi Arabia Co.


0029 KHEP-MS-AR-0029-00
(Water Resistant Tile Adhesive) Ltd.

Ikk Group of
0030 KHEP-MS-AR-0030-00 Wall & Celing Metal Framing Companies
Jeddah,Saudi Arabia

Ceiling framing:
Binex Jeddah, Saudi
0031 KHEP-MS-AR-0031-00 1. Suspended ceiling
Arabia
accessories
GYPSUM BOARD ASSEMBLIES:
1. SUSPENDED CEILING ACCESSORIES SAUDI ALLIED METAL
2. DRY WALL FRAMING ACCESSORIES INDUSTRIES – Metal
3. GYPSUM BOARD – REGULAR Framing System
0032 KHEP-MS-AR-0032-00
4. GYPSUM BOARD – MOISTURE RESISTANT MADA GYPSUM –
5. GYPSUM BOARD – FIRE RESISTANT Gypsum Board
6. PLASTERBOARD ACCESSORIES
(with Samples)

External Paint System: Jotun Jeddah, Saudi


0033 KHEP-MS-AR-0033-00
1. Acrylic Emulsion paint system: Arabia

Exterior Paintings
Jotun Jeddah, Saudi
0033.1 KHEP-MS-AR-0033-01 1. Acrylic Emulsion paint system
Arabia
(Samples for Texture paint finish)
Internal Paint System:
1. Acrylic Emulsion paint system: Eggshell (Silk Jotun Jeddah, Saudi
0034 KHEP-MS-AR-0034-00
finish) Arabia
walls & ceiling
External Paint System AL JAZEERA
0035 KHEP-MS-AR-0035-00
1. Exterior emulsion paint system for walls JEDDAH,Saudi Arabia

Tiling:
Saveto construction
0036 KHEP-MS-AR-0036-00 1. Tile adhesive-ceramic tile fix
materials
(weather resistant cementitious adhesive)
Tiling:
Saveto construction
0037 KHEP-MS-AR-0037-00 1. Tile grouting-vetonit tile grout
materials
(weather resistant tile grout)

ROOF, BALCONY & WET AREA WATERPROOFING


SYSTEM
1. Rubber Guard EPDM Membrane
2. Quick Seam Splice Tape
3. Quick Seam Form Flash
4. 18mm thk. Geodrain DD 180
4. ARKSEAL- W
5. Chemkote 300
(SEE ATTACHED
0038 KHEP-MS-AR-0038-00 6. Geotextile
SHEET)
7. Thermal Insulation Board
8. Polyurethane Sealant (SIKA)
9. Water Block Seal (S-20)
10. Lap Sealant HS
11. Aluminum Flashing & Strip Bar
12. Polyethylene Sheet (250 micron)
13. Firestone Bonding Adhesive BA 2004 (T)
14. Screw Plug

Tiling
0039 KHEP-MS-AR-0039-00 BASF
1- Tile grout-master tile 30
Tiling
0040 KHEP-MS-AR-0040-00 1- Tile Adhesive-Master tile 30 BASF
2- Tile Adhesive-Master tile 4

Door Hardwares 1.
Hinges
2. Mortise Lock cases
3. Cylinders
0041 KHEP-MS-AR-0041-00 4. Lever Handles Simplex Hardware
4. Escutcheon
5.Door Closer
6. Weather-
stripping/Threshold/Casketing/Astragals/ Sweeps

Tiling
1- Tile Adhesive - Laticrete 254 Platinum
2- Tile grout -Laticrete 1500 sanded grout
0042 KHEP-MS-AR-0042-00 Laticret
3- Tile grout - Laticrete1600 Unhanded grout
4- Tile grout -Laticrete 1776 grunt Admix
(Enhancer)
Tiling
1- Tile Adhesive - Laticrete 254 Platinum
2- Tile grout -Laticrete 1500 sanded grout
0042.1 KHEP-MS-AR-0042-01 3- Tile grout - Laticret
Laticrete1600 Unhanded grout
4- Tile grout -Laticrete
1776 grunt Admix (Enhancer)
Painting
0043 KHEP-MS-AR-0043-00 HEMPEL
1-Exterior anint Finish
Painting
0044 KHEP-MS-AR-0044-00 HEMPEL
1- Interior Paint Finish

Thermal Insulation 1- Saudi Rock Wool


0045 KHEP-MS-AR-0045-00
Insulation - SRWF Cavity Panel (Exterior Walls) Riyadh, KSA

Tiling Don Construction


0046 KHEP-MS-AR-0046-00
1- Floor & Wall Tile Adhesive - Cemfix GP Specialties Ltd (DCP)

Portland cement for Plastering 1- Al


0047 KHEP-MS-AR-0047-00 AL Safwa
Safwa Cement -Joddran
Masonry Mortaring & Grouting 1-
Sika Saudi Arabia Co.
0048 KHEP-MS-AR-0048-00 Mortar Bonding Agent - Sika bond DV
Ltd.
(Tile Fixing Mortar)
ALUMINUM TRELLISES - PERGOLAS
1. ALUMINUM RECTANGULAR TUBE (200mm x
GLOBAL ALUMINUM
50mm x 3mm)
SYSTEMS CO. LTD
0049 KHEP-MS-AR-0049-00 2. ALUMINUM RECTANGULAR BAR (200mm X 4mm
DOW CORNING
Thick.)
3. SEALANT – DOW CORNING 813C

ALUMINUM TRELLISES - PERGOLAS


1. ALUMINUM RECTANGULAR TUBE (200mm x
50mm x 3mm)
0049.1 KHEP-MS-AR-0049-01 2. ALUMINUM RECTANGULAR BAR (200mm X 4mm Alupco
Thick.)
(With Sectional Elements Sample)

ALUMINUM TRELLISES - PERGOLAS


1. ALUMINUM RECTANGULAR TUBE (200mm x
0049.2 KHEP-MS-AR-0049-02 50mm x 3mm) Alupco
2. ALUMINUM RECTANGULAR BAR (200mm X 4mm
Thick.)

SANITARY ACCESSORIES
1. PAPER HOLDER # AI0080CS
2. SOAP DISH CORNER # AC0964C
3. SHOWER RAIL SET 4 SPRAY # 28436001
0050 KHEP-MS-AR-0050-00 SEE ATTACHED
4. SINGLE LEVER BATH MIXER ½” # 33300 001
5. SHOWER PARTITION GLASS
6. BATHTUB WITH DRAIN #62661 / 68005

Overhead Coiling Doors 1. Rollc For Trading Co.


0051 KHEP-MS-AR-0051-00
Rolling Shutter - Rcal-97 Ltd. Jeddah

Overhead Coiling Doors 1. Rollc For Trading Co.


0051.1 KHEP-MS-AR-0051-01
Rolling Shutter - Metecno Panels Ltd. Jeddah

Overhead Coiling Doors 1.


Rollc For Trading Co.
0051.2 KHEP-MS-AR-0051-02 Rolling Shutter - Metecno Panels Note:
Ltd. Jeddah
Available RAL colors - 9006, 9002 & 9010

Ebaa House for


Tiling
0052 KHEP-MS-AR-0052-00 Ceramic & Marble Co.
1-Porcelain Tiles 600 x 600 x 10mm
Riyadh,KSA.
Ebaa House for
Tiling
0052.1 KHEP-MS-AR-0052-01 Ceramic & Marble Co.
1-Porcelain Tiles 600 x 600 x 10mm
Riyadh,KSA.
Lovely Building
Tiling
0053 KHEP-MS-AR-0053-00 Materials Industrial
1-Mosaic Tiles
Co.LTD.
Counter tops 1- Dupont corian
0054 KHEP-MS-AR-0054-00
Corian - Kitchen counter top interiors
Tiling
0055 KHEP-MS-AR-0055-00 China Pearl
1-Mosaic Tiles

Exterior Finishes 1-
0056 KHEP-MS-AR-0056-00 TOB China
Terracotta

Tiling
1- Ceramic Tiles 500x500x9mm G-5000-BE 2-
Ceramic Tiles 500x500x9mm G-5006-BE 3- Forsan Ceramics
0057 KHEP-MS-AR-0057-00
Ceramic Tiles 500x500x9mm G-5035-IV 4- Riyadh,KSA
Ceramic Tiles 500x500x9mm G-3034-IV 5-
Ceramic Tiles 500x500x9mm G-Durina-IV
Tiling
Forsan Ceramics
0057.1 KHEP-MS-AR-0057-01 1- Ceramic Tiles 600x600x10mm Light Beige
Riyadh,KSA
2- Ceramic Tiles 600x600x10mm Beige
Wet Area Waterproofing
Absar Co. Ltd
0058 KHEP-MS-AR-0058-00 1- Durashield - Wet Area
Jeddah,KSA
Waterproofing System
Wet Area Waterproofing
0058.1 KHEP-MS-AR-0058-01 1- Durashield - Wet Area Delmon
Waterproofing System
Wet Area Waterproofing
0058.2 KHEP-MS-AR-0058-02 1- Durashield - Wet Area Delmon
Waterproofing System
Counter tops
Hanwha L&C
0059 KHEP-MS-AR-0059-00 1- Corian Counter top - Hanex
Corporation Co.Ltd.
2- Corian Counter top - Hanwha

SANITARY ACCESSORIES
1. CONCEALED CISTERM WC + BUTTON PANEL
2. HAND BIDET - SPC013
3. SPRAY W/ BASE & 1.2m HOSE – SPC010
4. 1.5m SINGLE HOSE – 4501
5. TUMBLER HOLDER – 93905
6. TISSUE HOLDER – 93903
EMPOLO SANITARY
0060 KHEP-MS-AR-0060-00 7. TOWEL RING – 93902
WARE
8. ROBE HOOK DOUBLE – 93904B
9. SHOWER SET – 8100 + 08 4700
10. CORNER SOAP HOLDER - 603-1
11. TOWEL BAR – 94001
12. SHOWER SET, 8”inch – BR-8 + SA003
13. MIXER SINGLE LEVER – 23 1101

SANITARY ACCESSORIES
1. CONCEALED CISTERM WC + BUTTON PANEL
2. HAND BIDET - SPC013
3. SPRAY W/ BASE & 1.2m HOSE – SPC010
4. 1.5m SINGLE HOSE – 4501
5. TUMBLER HOLDER – 93905
6. TISSUE HOLDER – 93903
EMPOLO SANITARY
0060.1 KHEP-MS-AR-0060-01 7. TOWEL RING – 93902
WARE
8. ROBE HOOK DOUBLE – 93904B
9. SHOWER SET – 8100 + 08 4700
10. CORNER SOAP HOLDER - 603-1
11. TOWEL BAR – 94001
12. SHOWER SET, 8”inch – BR-8 + SA003
13. MIXER SINGLE LEVER – 23 1101

Kitchen Hood 1-
0061 KHEP-MS-AR-0061-00 Ariston
SL 19.1p ix - F030098

Non-Structural Metal Framing 1. Dry


SSF Saudi scafolding
0062 KHEP-MS-AR-0062-00 Wall Partition System
Factory

Roof Waterproofing System 1.


0063 KHEP-MS-AR-0063-00 Alyap
Drainage Panel - Alfdrain CP20
Roof & balcony Waterproofing System 1- Darinage
0063.1 KHEP-MS-AR-0063-01 Alyap
Pamel - Alfdrain SH10
SANITARY ACCESSORIES
1. SHOWER MIXER - SL2061
2. WASH BASIN MIXER – SL2065
3. SHOWER SET - 2270
4. TUMBLER HOLDER – 10200 SERIES
0064 KHEP-MS-AR-0064-00 5. TISSUE HOLDER – 10200 SERIES Lima
6. TOWEL RING – 10200 SERIES
7. ROBE HOOK DOUBLE – 10200 SERIES
8. TOWEL BAR – 10200 SERIES
9. KITCHEN MIXER – K0046
PLUMBING FIXTURE & SANITARY ACCESSORIES
1. WATER CLOSET – WH 011
2. UNDER COUNTER BASIN – UB 004
3. WASH BASIN FULL PEDESTAL - 3009
4. TUMBLER HOLDER – 10200-3
5. TISSUE HOLDER – 10200-4
6. TOWEL RING – 10200-5
7. ROBE HOOK DOUBLE – 10200-6
0064.1 KHEP-MS-AR-0064-01 STAMINA
8. TOWEL BAR – 10200-2
9. SHOWER SYSTEM – 2270
10. KITCHEN MIXER – K004
11. BATH & SHOWER MIXER - 2061
12. BASIN MIXER – 2065
13. RAIN SHOWER WITH CONCEALED MIXER –
CM 006

PLUMBING FIXTURE & SANITARY ACCESSORIES


1. WATER CLOSET – WH 011
2. UNDER COUNTER BASIN – UB 004
3. WASH BASIN FULL PEDESTAL - 3009
4. TUMBLER HOLDER – 10200-3
5. TISSUE HOLDER – 10200-4
6. TOWEL RING – 10200-5
7. ROBE HOOK DOUBLE – 10200-6
0064.2 KHEP-MS-AR-0064-02 STAMINA
8. TOWEL BAR – 10200-2
9. SHOWER SYSTEM – 2270
10. KITCHEN MIXER – K004
11. BATH & SHOWER MIXER - 2061
12. BASIN MIXER – 2065
13. RAIN SHOWER WITH CONCEALED MIXER –
CM 006

Plumbing Accessories 1.
0065 KHEP-MS-AR-0065-00 Ablution Faucet - Stamina Spry (W0004) 2. Lima
Floor Drain - sf0017
Residential Appliances 1.
0066 KHEP-MS-AR-0066-00 Super Chef
Kitchen Hood - SC 90 Krese

0067 KHEP-MS-AR-0067-00 Mortar 7 Grout for CMU Block Work

ALUPCO - Alum tube


Aluminum Trellis 1-
JUTON -
Alluminum Tubes 2-
0068 KHEP-MS-AR-0068-00 Powder Coated
Powser coated - Corro - Coat PE-F-Façade S-1301,
SPLIT -
1303, 1307, & 1308 3- Expansion Bolts
Expansion bolt

CCCI Consultant
Hollow Metal Doors 1-
Creative for
0069 KHEP-MS-AR-0069-00 Single Leaf Mettal Door
Construction Industry
2- Double Leaf Mettal Door
Riyadh, KSA

Railings 1-
Staircase Aluminum Railings Regal Aluminum
0070 KHEP-MS-AR-0070-00
2- Balcony Aluminum Railings Kupeste Ltd. STI
( With Samples)

Wooden Door 1-
Integrated Wood
Wooden Door
0071 KHEP-MS-AR-0071-00 Industries Riyadh,
2- Fire Rated Door
KSA
( With Samples)
Portland cement for Plastering Mix for CMU Block
0072 KHEP-MS-AR-0072-00 Alazzaz Co.Ltd
Work & Concrete Surfaces
Counter tops 1-
Corian - Kitchen counter top
0073 KHEP-MS-AR-0073-00 2- Corian - Buffet Staron
counter top
( With Samples)
Counter tops 1-
Corian - Kitchen counter top
0073.1 KHEP-MS-AR-0073-01 2- Corian - Buffet Staron
counter top

JOINT SEALANT 1-
0074 KHEP-MS-AR-0074-00 DCP Saudi
Flex seal - PU425 for general joints
FIRE STOPPING 1-
0075 KHEP-MS-AR-0075-00 Fire stop sealant - Flamex one (Flexible in- FOSROC
tumescent sealant)

RECIDENTIAL APPLIANCE 1-
0076 KHEP-MS-AR-0076-00 GLEM - Polend
Kitchen hood - GHC93/63IX

MASONRY & PLASTER ACCESSORIES


1. BLOCK MESH LADDER TYPE
2. CORRUGATED ANGLE
3. CORRUGATED PLATE
4. TWO-PIECE WALL TIE
5. ANGLE BEAD
0077 KHEP-MS-AR-0077-00 WAMCO
6. COIL LATH
7. PLASTER STOP
8. EXPANDED METAL LATH
9. CONTROL JOINT & ARCHITRAVE BEAD
(with SAMPLES)

Metal Fabrication
Tameem M.Bin Ashry
0078 KHEP-MS-AR-0078-00 1- Glav. Steel Ladder Safty cage 2- Paint
EST. Riyadh KSA.
- Primer & Top Coat

Fire Stopping 1- STI The Fire Stop


0079 KHEP-MS-AR-0079-00
LCI Intumescent Fire stop Sealant Authority

Tile Adhesive 1-
0080 KHEP-MS-AR-0080-00 Laticrete
Lacticrete 305 - for Ceramic Tile

Tile Adhesive 1-
0081 KHEP-MS-AR-0081-00 Lacticrete 325 Premium - for Ceramic, Porcelain Laticrete
Tile & Stone
Tile Adhesive 1-
0082 KHEP-MS-AR-0082-00 Lacticrete 335 Premium - for Ceramic, Porcelain, Laticrete
Glass Mosaic Tile & Stone
NON - Structural Metal Framing
0083 KHEP-MS-AR-0083-00 1- Metal stud & Runner for Gypsum Bawani Duct Factory
Board walls
Railings 1-
Staircase Aluminum Railings
Engineering Domain
0084 KHEP-MS-AR-0084-00 2- Balcony Aluminum
Riyadh, KSA
Railings
( With Samples)
Railings 1-
Staircase Aluminum Railings
2- Balcony Aluminum
Engineering Domain
0084.1 KHEP-MS-AR-0084-01 Railings
Riyadh, KSA
( With Samples)
Option-1 Aluminum Railings Option-2
Galvanized Steel

Roof & balcony Waterproofing System 1-


Bituplus G 4200 2-
Bituplus P 4200 3-
Polyprime SB 4-
POLYBIT, MATTEX,
Mattex 180 g/m2 5-
0085 KHEP-MS-AR-0085-00 POLIAN, ACC &
Poly Ethelene Film 150mic 6-
AERCEL
Extrude Polystyrene Roofmate 100mm
7- Aecel Light Weight
foam Concrete 8- Polyseal PU Sealant
9-Aluminum Flashing
Roof & balcony Waterproofing System 1-
Bituplus G 4200 2-
Bituplus P 4200 3-
Polyprime SB 4-
POLYBIT, MATTEX,
Mattex 180 g/m2 5-
0085.1 KHEP-MS-AR-0085-01 POLIAN, ACC &
Poly Ethelene Film 150mic 6-
AERCEL
Extrude Polystyrene Roofmate 100mm
7- Aecel Light Weight
foam Concrete 8- Polyseal PU Sealant
9-Aluminum Flashing

Mosaic 1-
0086 KHEP-MS-AR-0086-00 Longju
Ceramic Mosaic

Plumbing Fixtures
0087 KHEP-MS-AR-0087-00 Awal Bath Systems
1- Bathtub - Massah Bathtub

Plumbing Fixtures
0088 KHEP-MS-AR-0088-00 Penta
1- Concealed Flush Tank

Aluminum Doors & Frames


1- Aluminum Doors - Alupco
therm 56D Hinged Doors
0089 KHEP-MS-AR-0089-00 ALUPCO
2- Paint - Powder Coated PE-F 1308, RAL
9006 Smooth (Sample Enclosed)
(WITH SECTIONAL ELEMENTS SAMPLES)

ALUMINUM WINDOWS & FRAMES


1, ALUMINUM WINDOWS – ALUPCOtherm 56W
HINGED WINDOWS
2. JOINT SEALANT – DOW CORNING 813C
3. GLAZING GASKET – EPDM 70 Shore (A)
0090 KHEP-MS-AR-0090-00 ALUPCO
4. PAINT – POWDER COATED PE-F 1308, RAL
9006 Smooth

(WITH SECTIONAL ELEMENTS SAMPLES)

ALUMINUM WINDOWS & FRAMES


1. ALUM. SLIDING WINDOWS – ALUPCOtherm
97SL
SLIDING WINDOWS
2. JOINT SEALANT – DOW CORNING 813C
0091 KHEP-MS-AR-0091-00 ALUPCO
3. GLAZING GASKET – EPDM 70 Shore (A)
4. PAINT – POWDER COATED PE-F 1308, RAL
9006 Smooth
(WITH SECTIONAL ELEMENT SAMPLES)

ALUMINUM WINDOWS & FRAMES


1. ALUM. CURTAIN WINDOWS – CURTAIN WALL
50SG
2. JOINT SEALANT – DOW CORNING 813C
3. GLAZING GASKET – EPDM 70 Shore (A)
0092 KHEP-MS-AR-0092-00 ALUPCO
4. PAINT – POWDER COATED PE-F 1308, RAL
9006 Smooth

(WITH SECTIONAL ELEMENT SAMPLES)

ALUMINUM HARDWARES
1. WINDOW HANDLE – ART 0800
2. SIDE HANDLE – ART 648
3. DOOR HANDLE – ART 640
4. HINGE – ART 299
0093 KHEP-MS-AR-0093-00 LAVAAL
5. PUSH BOLT & ROD END – ART 478
6. BOTTOM HUNG WINDOW ARM – ART 410
7. DOOR HINGE – ART 670
(WITH SAMPLES)
WOODEN DOOR SAMPLE CONSIST OF:
A. CROSS SECTION SHOWING DETAILS
(PARTICLE BRD + HPL LAYER)
B. FINAL FINISHING/COLOR AS PER
INSTALLED AT MOCK-UP B2 (WELD
CHERRY - 2545 SF PG)
1. WOODEN DOORS FIRE RATED
FRAME: SOLID WOOD MERANTI, STAINED
FINISH
DOOR LEAF : PARTICLE BOARD, THERMAL
INSULATION & MDF WITH
HPL LAMINATED FINISH – WELD CHERRY
2. WOODEN DOORS WITH ACOUSTIC BAWANI CASEWORK
0094 KHEP-MS-AR-0094-00
FRAME: SOLID WOOD MERANTI, STAINED FACTORY
FINISH
DOOR LEAF : PARTICLE BOARD, ACOUSTIC &
MDF WITH HPL LAMINATED
FINISH – WELD CHERRY
3. WOODEN DOORS
FRAME: SOLID WOOD MERANTI, STAINED
FINISH
DOOR LEAF : PARTICLE BOARD WITH HPL
LAMINATED
FINISH – WELD CHERRY (SECTIONAL
SAMPLE - FOR VISUAL DETAIL ONLY)

FLUSH WOOD DOOR


BAWANI CASEWORK
0094.1 KHEP-MS-AR-0094-01 1. Fireban - for Fire Ralated Door
FACTORY
2. Saudi Rockwool - for Acoustic Door

ALUMINUM LOUVERS
1, ALUM. LOUVERS – 23481, 150 x 25 x 2mm
2. PAINT – POWDER COATED PE-F 1308, RAL
0095 KHEP-MS-AR-0095-00 9006 Smooth ALUPCO

(WITH SECTIONAL ELEMENT SAMPLES)

TILING
1. CERAMIC TILE 400x400X9mm (dry area
flooring)
2. CERAMIC TILE 200x200X8mm (wet area
flooring)
3. CERAMIC TILE 200x400x9mm (wet area walls)
4. CERAMIC TILE 100x400x8mm (wet area
border)
0096 KHEP-MS-AR-0096-00 SAUDI CERAMIC
5. OUTSIDE ANGLE BEAD 20cm (wet area angle
bead)
6. CERAMIC MOSAIC TYPE 200x200x8mm
6. SKIRTING 100x400x8mm
SAMPLES PROVIDED FOR COLOR SELECTION
PURPOSES ONLY
THE SIZES AS PER LISTED ABOVE

UNIT MASONRY
1. CMU 200x200x400mm
2. CMU 150x200x400mm AL BASSAMI GROUP
0097 KHEP-MS-AR-0097-00
3. CMU 100x200x400mm CO.
4. CMU 200x200x400mm (FIRE RATED)

GYPSUM BOARD ASSEMBLIES


0098 KHEP-MS-AR-0098-00 1. SOUND INSULATION – KNAUF ACOUSTIC ROLL KNAUF INSULATION
TERRACOTTA CLAY TILE RAINSCREEN ASSEMBLY
1. TERRACOTTA (ARCHITON)
Sample for Approval: a) Asiklar Bldg. Product
0099 KHEP-MS-AR-0099-00
Final Finishes b) Architon
Accessories and Fixation

METAL FABRICATION
1. Galvanized Steel Gate - 900 x 1600 mm (with
Ramz co. for Metal
0100 KHEP-MS-AR-0100-00 Sample - Final Fabrication to be As per Approved
Ind.
Attached Drawing)

TILINGS - STAIRCASE (TREAD & RISER) EBAA House for


0101 KHEP-MS-AR-0101-00 1. Porcelain Tiles - Lafaenza Ceramica : 1200 x Ceramic & Marble Co.
330 x 10mm (With Samples) Riyadh,KSA.

Residential Casework
1. Master Bedroom Wardrobe
2. Badroom -1 Wardrove
3. Bedroom -2 Wardrove Bawani CaSEWORK
0102 KHEP-MS-AR-0102-00
4. Flex room Wardrove FACTORY Riyadh, KSA

(Physical Samples As per Installed at Mock up Villa)

Resinous Flooring
1. Jotafloor Topcoat
Jotun Paints Jeddah,
0103 KHEP-MS-AR-0103-00 2. Jotafloor Sealer
KSA
(With Sample Board - 3 Option Colour)

Screed Concrete Mix Design


(20Mpa OPC) Al Tawi Concrete Supply For
0104 KHEP-MS-AR-0104-00 Al Tawi
Leveling Concrete Layer Under Floor Tiling

Painting works
1. Interior Paints Arbian Building
0105 KHEP-MS-AR-0105-00 2. Exterior Paints Chemical Factory
Jeddah KSA

Plumbing Fixtures 1.
Kitchen sink - double bowl S6-L0-15 (Cluster)
Jawadah Industrial
0106 KHEP-MS-AR-0106-00 2. Kitchen sink
Co. Ltd
- Single bowl S6-L0-20 (Ancillary Building)

0107 KHEP-MS-AR-0107-00 Tiling - Mosaic Tile - AX167 (325 x 325mm) Lovely

0107.1 KHEP-MS-AR-0107-01 Tiling - Mosaic Tile - AX167 (325 x 325mm) Lovely

Wet Area Waterproofing


0108 KHEP-MS-AR-0108-00 Delmon
1.Durashield-Wet Area Waterproofing System

Wet Area Waterproofing


0108.1 KHEP-MS-AR-0108-01 Delmon
1.Durashield-Wet Area Waterproofing System

Metal Fabrication Ramz Co. For Metal


0109 KHEP-MS-AR-0109-00
1. Galvanized Steel Rope Hook IND Riyadh KSA

Balcony Waterproofing
0110 KHEP-MS-AR-0110-00 Delmon
1.Durashield-Balcony Waterproofing System

Balcony Waterproofing
1. Bituplus P 4200 - 4mm THK App Moditied
0110.1 KHEP-MS-AR-0110-01 Bituminos Elastomeric Membrane Polybit, Mattex
2. Polyprime SB
3. Geotextile 180g/m2
Portland cement for Plastering
Saveto Construction
0111 KHEP-MS-AR-0111-00 1. Vetonit Finish Wreg
Materials
2. Vetonit Finish WR
TERRACOTTA CLAY TILE RAINSCREEN ASSEMBLY
1. TERRACOTTA (ARCHITON) Asiklar Bldg. Product
0112 KHEP-MS-AR-0112-00
Architon

Countertops Dupont corian


0113 KHEP-MS-AR-0113-00
1. Corian - 1454 Pebble Strem interiors

Thermal Insulation ALAMDAR


0114 KHEP-MS-AR-0114-00
1- Polystyrene Board for Cavity External wall VAPOTHERM CO. LTD

Thermal Insulation
0115 KHEP-MS-AR-0115-00 Blue Guard
1- Polystyrene Board for Cavity External wall

Masonry Accessories Isam Kabbani &


0116 KHEP-MS-AR-0116-00
1. Steel Lintel Partners

United Mining
Cement Board
0117 KHEP-MS-AR-0117-00 Industries
1. Cement Board - Unicem
Jeddah
Thermal Insulation
0118 KHEP-MS-AR-0118-00 Blue Guard
1. Polystyrene Board for Cavity External Wall
Tiling Wunsch Plaster
0119 KHEP-MS-AR-0119-00
1. Tile Adhesive WP-552 Factory
Portland Cement Plastering
Wunsch Plaster
0120 KHEP-MS-AR-0120-00 1. Cement render plaster WP-200
Factory
2. Bonding Coat WP-110
Countertops
Dupont corian
0121 KHEP-MS-AR-0121-00 1. Corian - Dupont (1454 Pebbel Stream)
interiors

Sanitary Accessories
01. Soap Dish - A9123AA (IDEAL)
02. Toilet Tissue Holder - A9127AA (IDEAL)
03. Towel Ring - A9130AA (IDEAL)
Al Ghamdi Co.
0122 KHEP-MS-AR-0122-00 04. Robe Hook Double - A9116AA (IDEAL)
IDEAL
05. Towel Rail - A9118AA (IDEAL)
06. Tumbler Holder - A9121AA (IDEAL)
07. Trigger Spray - B0595AA (IDEAL)

CIVIL
1 - Neprolast
2 - Sappco
0001 KHEP-MA-33-0001-00 uPVC Pipe & Fittings
3 - Al-
Tamam

Detectable Warning Tape (Storm Drainage and Al Ismael Plastic


0002 KHEP-MS-CI-0002-00
Sanitary Sewer) Factory

WAMCO ( Wadi
Reinforcement Accessories PVC Spacers &
0003 KHEP-MS-CI-0003-00 Maramer Trading
Chamfers
Group)
Reinforcement Accessories Manufacturers ISSAM
0003.1 KHEP-MS-CI-0003-01 Issam Kabani
KABANI Vendors: GURBETCILER
National Factory for
0003.2 KHEP-MS-CI-0003-02 Reinforcement Accessories Plastic Industry (NFP)
Co. Ltd.
1. Future Pipe,

0004 KHEP-MS-CI-0004-00 GRP Pipe & Fittings


2. Almadarat
Pipe
UPVC Pipe & Fittings (Sewer Line (Infra)) Class 4,
0005 KHEP-MS-CI-0005-00 ALMUNIF PIPE MMP
SCH. 40

0005.1 KHEP-MS-CI-0005-01 UPVC Pipe & Fittings (Sewer Line(Infra) ) ALMUNIF PIPE MMP

UPVC Pipe for Sanitary sewer network


0005.2 KHEP-MS-CI-0005-02 AL MUNIF PIPE
system(Infra.)
0006 KHEP-MA-33-0006-00 GRP Pipe & Fitting

Upvc Pipe With Fittings (Irrigation Network


0007 KHEP-MS-CI-0007-00 ALMUNIF PIPE
System) Class 5, SHD 80

Cover frame of Sanitary Sewer manholes &


0008 KHEP-MS-CI-0008-00 Saudi Cast
inspection chamber
Cover frame of Sanitary Sewer manholes &
0008.1 KHEP-MS-CI-0008-01 Saudi Cast
inspection chamber

Detectable Warning Tape (Potable Water and Al Ismail Plastic


0009 KHEP-MS-CI-0009-00
Irrigation Network System) Factory

0010 KHEP-MS-CI-0010-00 Hdpe pipes for potable network system Neproplast

Future Pipe
0011 KHEP-MS-CI-0011-00 GRP manholes for sewer network system
Industries

Ramees est. for


Precast manholes, catch basin & inspection
0012 KHEP-MS-CI-0012-00 contracting precast
chamber for sewer & storm network
factory

Precast manholes, catch basin & inspection Nagadi preformed


0013 KHEP-MS-CI-0013-00
chamber for sewer & storm network concrete factory

Hdpe Pipes With Fitting for Potable Water Network


0014 KHEP-MS-CI-0014-00 Al Munif
System

Hdpe Pipes and Fittings for Potable Network


0014.1 KHEP-MS-CI-0014-01 Al Munif
System

0015 KHEP-MS-CI-0015-00 Geo Textile for Utilities Line Texofib

Saudi Valve
0016 KHEP-MS-CI-0016-00 Flanged Gate Valve with Spindle and hand wheel
Manufacturing ( AVK)

Flanged Gate Valve with Spindle, Surface Box &


Saudi Valve
0016.1 KHEP-MS-CI-0016-01 Hand Wheel for Potable & Irrigation Network
Manufacturing ( AVK)
System

FlangeAdapter Dismantling Joint and Couplet for Saudi Valve


0017 KHEP-MS-CI-0017-00
Potable and Irrigation Manufacturing ( AVK)

Flange Adapter Dismantling Joint and Couplet for Saudi Valve


0017.1 KHEP-MS-CI-0017-01
Potable and Irrigation Manufacturing ( AVK)

Hdpe Pipes with Fittings for Potable Network


0018 KHEP-MS-CI-0018-00 Al Wasail
System

Hdpe Pipes with Fittings for Potable Network


0018.1 KHEP-MS-CI-0018-01 Al Wasail
System

0019 KHEP-MS-CI-0019-00 GRP Pipes for Storm Network System AL Munif

0019.1 KHEP-MS-CI-0019-01 GRP Pipes for Storm Network System AL Munif

Detectable Warning Tape for Sewer Storm, Potable Global Source


0020 KHEP-MS-CI-0020-00
& Irrigation Company

Detectable Warning Tape for Sewer Storm, Potable


0021 KHEP-MS-CI-0021-00 Elift Arabian Factory
& Irrigation

0022 KHEP-MS-CI-0022-00 GRP Manholes for Sewer Network System Technofiber


Linktech Engineering
0023 KHEP-MS-CI-0023-00 Ladder for Storm Network System
pvt.Ltd

0024 KHEP-MS-CI-0024-00 Ladder for Storm Network System Riyadh Foundry Co

Ferrotech
0025 KHEP-MS-CI-0025-00 Ladder for Storm Network System
International Fze.
GRP Manholes with ladder for Sewer Network
0026 KHEP-MS-CI-0026-00 Al Munif
System
GRP Manholes with ladder for Sewer & Inspection
0026.1 KHEP-MS-CI-0026-01 Al Munif
Chamber Network System

Water Stops for cast in situ of manholes for storm Isam Kabani Ikk -
0027 KHEP-MS-CI-0027-00
network Unitech

Water Stops for cast in situ of manholes for storm Isam Kabani Ikk -
0027.1 KHEP-MS-CI-0027-01
network Unitech

Puddle Flange & Fittings ductile Iron for Potable &


0028 KHEP-MS-CI-0028-00 Gulf Meters Factory
Irrigation network System
Flange gate Valve, Butterfly Valve, Universal
Mashail Future
0029 KHEP-MS-CI-0029-00 Coupling, Dismantling joint, Surface box & key for
Trading
valve (Potable & Irrigation network)
Bitumen Impregnated Fiber Filler Board for Isam Kabani Ikk -
0030 KHEP-MS-CI-0030-00
Encasement of Utilities Pipes Unitech
Bitumen Impregnated Fiber Filler Board for Isam Kabani Ikk -
0030.1 KHEP-MS-CI-0030-01
Encasement of Utilities Pipes Unitech

Fire Hydrant with Valve and Accessories for Fire Saudi Valve
0031 KHEP-MS-CI-0031-00
Fighting Network System Manufacturing ( AVK)

Fire Hydrant with Valve and Accessories for Fire Saudi Valve
0031.1 KHEP-MS-CI-0031-01
Fighting Network System Manufacturing ( AVK)

Sika grout for the opening around pipes of


0032 KHEP-MS-CI-0032-00 chambers and manholes on utilities networks Sika
system
Sika grout for the opening around pipes of
0032.1 KHEP-MS-CI-0032-01 chambers and manholes on utilities networks Sika
system

Master protect 1890 - for Epoxy resin mortar of the


0033 KHEP-MS-CI-0033-00 Basf
benching

Master protect 1813 - for Epoxy Paint of the


0034 KHEP-MS-CI-0034-00 Basf
internal side of manholes

Master Flow 544 - Grout of Opening Pipe gab for


0035 KHEP-MS-CI-0035-00 Basf
Chambers valve & Manholes Utilities Network

0036 KHEP-MS-CI-0036-00 Master seal Np 472 - Sealant Joint for Civil Work Basf

Master seal Np 472 - Sealant Joint Between


0036.1 KHEP-MS-CI-0036-01 Precast Ringd and as Manufacture uses for Civil Basf
work

0037 KHEP-MS-CI-0037-00 Master seal Np 477 - Sealant Joint for Civil Work Basf

Master seal Np 477 - Sealant Joint Between


0037.1 KHEP-MS-CI-0037-01 Precast Ringd and as Manufacture uses for Civil Basf
work
Master Flow 920 for injaction of the rebar dowel
0038 KHEP-MS-CI-0038-00 Basf
and ladder steps
Key fix E Epoxy Resin Cartridge System for
0039 KHEP-MS-CI-0039-00 Anchoring for the Injection of the Rebar Dowel and DCP
ladder Steps

Strong coat Primer Range Epoxy Resin


0040 KHEP-MS-CI-0040-00 DCP
based Primer for Internal Manholes

Strong coat 400


0041 KHEP-MS-CI-0041-00 DCP
Epoxy Protective Coating for Internal Manholes

Quick Mast 201EJ


0042 KHEP-MS-CI-0042-00 DCP
Epoxy Mortar for Benching of Manholes
Flex seal PU425 Joint
0043 KHEP-MS-CI-0043-00 DCP
Sealant for Precast manholes
Master flow 559 Versa tile High Strength for the
0044 KHEP-MS-CI-0044-00 Basf
Gaps Surrounding Pipes of Chambers
Precast Concrete pavers 200 x
0045 KHEP-MS-CI-0045-00 ABNI
100 x 60mm,200 x 100 x 800mm
Cover and Frame For Sewer & Storm Manholes & Saudi Cyprus
0046 KHEP-MS-CI-0046-00
Catch Basin & Inspection, Chambers Foundries (SCF)

Cover and Frame For Sewer & Storm Manholes &


0047 KHEP-MS-CI-0047-00 IFCO
Catch Basin & Inspection, Chambers

0048 KHEP-MS-CI-0048-00 Fire Hydrant with Valve Naffco

0049 KHEP-MS-CI-0049-00 Artificial Turf Bellinturf

Saudi Valve
0050 KHEP-MS-CI-0050-00 Flanged Gate Valve
Manufacturing ( SVM)

Saudi Valve
0050.1 KHEP-MS-CI-0050-01 Flanged Gate Valve
Manufacturing ( SVM)

Saudi Valve
0050.2 KHEP-MS-CI-0050-02 Flanged Gate Valve, SurfaceBox, Spindle & T-Key
Manufacturing ( SVM)

Flanged Gate Valve, SurfaceBox, Spindle & T-Key Saudi Valve


0050.3 KHEP-MS-CI-0050-03
(For Portable & Irrigation System) Manufacturing ( SVM)

Stainless Steel Bolts, Nuts & Washers for potable,


0051 KHEP-MS-CI-0051-00 Asia Bolts
fire fighting & irrigation valves

Stainless Steel Bolts, Nuts & Washers for potable,


0051.1 KHEP-MS-CI-0051-01 Asia Bolts
fire fighting & irrigation valves

GRE / RTR Pipes & Fittings for tie inn on potable & Future pipe industries
0052 KHEP-MS-CI-0052-00
Fire fighting network system (FPI)

GRE / RTR Pipes & Fittings for tie inn on potable & Future pipe industries
0052.1 KHEP-MS-CI-0052-01
Fire fighting network system (FPI)

0053 KHEP-MS-CI-0053-00 GEO Textile Fabric for Hardscape Texofib


Conbextra HF (Versatile High Strenghth for the
0054 KHEP-MS-CI-0054-00 FOSROC
Gaps Surrounding Pipes of Chambers)

Webertec 301 (Versatile High Strenghth for the WEBER SAINT


0055 KHEP-MS-CI-0055-00
Gaps Surrounding Pipes of Chambers & Manholes) GOBAIN

0056 KHEP-MS-CI-0056-00 AWG14 & AWG12 for wiring irrigation system Al Fanar

ELECTRICAL

Low Voltage Cable (4x300mm2, 4x185mm2,


0000 KHEP-MA-26-0001-00 Riyad Cables
4x25mm2 & 2x25mm2)

Low Voltage Cable (4x300mm2, 4x185mm2,


0000.1 KHEP-MS-EL-0001-01 Riyadh Cables
4x25mm2 & 2x25mm2)

0000.2 KHEP-MS-EL-0001-02 LV Cables & Wires Bahra

0000.3 KHEP-MS-EL-0001-03 LV Cables & Wires - PVC Sheathed for Outdoor Bahra Cable

Medim Voltage Cable (3x300mm2


0001 KHEP-MA-26-0002-00 Saudi Cable Company
Cu/XLPE/PVC/DST)
New Products
0002 KHEP-MA-26-0003-00 uPVC Conduit, Fittings & Accessories
Industries Co.Ltd

0003 KHEP-MA-26-0004-00 Underground Warning Tape Napco Corporation

0004 KHEP-MA-26-0005-00 Grounding and Bonding Materials Furse U.K

New Products
0005 KHEP-MA-27-0002-00 HDPE Duct and Sub-Duct Industries Co.Ltd
(Neproplast)

Bahra Cables
0006 KHEP-MS-EL-0006-00 PVC Conduit, Fittings & Accessories
Company

1-Barton
2-
Saudi Steel Pipe
Rigid Steel Conduits, Fittings & Accessories
0007 KHEP-MS-EL-0007-00 Company
( Option 1, 2 & 3)
3- O-Z Gedney
(Fittings)

0008 KHEP-MS-EL-0008-00 Outlet Boxes (Option 1) Barton

1-Barton
2-
Int'l Metal Hose Co.
Liquidtight Flexible Metal Conduit Fittings &
0009 KHEP-MS-EL-0009-00 3-
Accessories
Electri-flex Company
4-Neer / O-
Z Gedney (Fittings)

Liquidtight Flexible Metal Conduit Fittings &


0009.1 KHEP-MS-EL-0009-01 Barton
Accessories

Liquid Tight Flexible Metal Conduit Fittings &


0009.2 KHEP-MS-EL-0009-02 Barton
Accessories

1-Wheatland
2-
Int'l Tube & C'duit Co.
0010 KHEP-MS-EL-0010-00 Electrical Metallic Tubing, Fittings & Accessories
3-
Neer / O-Z Gedney
(Fittings)

0011 KHEP-MS-EL-0011-00 Junction Box/ Pull Box (Option 1) Al Fanar

0012 KHEP-MS-EL-0012-00 Junction Box/ Pull Box (Option 2) Hubbell-Raco

0012.1 KHEP-MS-EL-0012-01 Junction Box/ Pull Box (Option 2) Hubbell-Raco

0013 KHEP-MS-EL-0013-00 Junction Box/ Pull Box (Option 3) Crouse Hinds

0013.1 KHEP-MS-EL-0013-01 Junction Box/ Pull Box (Option 3) Crouse Hinds

Flexible Metallic Conduit, Fittings & Accessories International Tube &


0014 KHEP-MS-EL-0014-00
(Option 1) Conduit Company

0014.1 KHEP-MS-EL-0014-01 EMT Conduit, Flexible Conduit & Fittings Tabalasa


0015 KHEP-MS-EL-0015-00 Single Core Building Wires Riyadh Cable

0016 KHEP-MS-EL-0016-00 Wiring Devices Spectra

0016.1 KHEP-MS-EL-0016-01 Wiring Devices Schneider

0017 KHEP-MS-EL-0017-00 Cable Glands (Option 1) CMP

0017.1 KHEP-MS-EL-0017-01 Cable Glands (Option 1) CMP - UK

0018 KHEP-MS-EL-0018-00 Cable Lugs (Option 1) Thomas & Betts

0018.1 KHEP-MS-EL-0018-01 Cable Lugs (Option 1) Zolex

0018.2 KHEP-MS-EL-0018-02 Cable Lugs (Option 1) Zolex

0019 KHEP-MS-EL-0019-00 Outlet Boxes MK

0020 KHEP-MS-EL-0020-00 Interior Lighting NATIONAL LIGHTING

GE / Trilux / Bega /
0020.1 KHEP-MS-EL-0020-01 Lighting Fixtures
Jiso / Goccia

Lighting Fixtures -
GE / Trilux / Bega /
0020.2 KHEP-MS-EL-0020-02 Including Lux Calculation for Laundry Area, Powder
Jiso / Goccia
Room & EN-Suite (GF&FF) Option 1

GE / Trilux / Bega /
0020.3 KHEP-MS-EL-0020-03 Lighting Fixtures
Jiso / Goccia

GE / Trilux / Bega /
0020.4 KHEP-MS-EL-0020-04 Lighting Fixtures
Jiso / Goccia

0021 KHEP-MS-EL-0021-00 UninterruptIble Power Supply Riello UPS

Elite Precast Concrete


0022 KHEP-MS-EL-0022-00 Cable Protective Tile
Limited.

MK Cable
PVC Conduit, Fittings & Accessories (Building
0023 KHEP-MS-EL-0023-00 Management
Wiring)
(Egatube)

PVC-Coated Galvanized steel rigid metal conduit &


0024 KHEP-MS-EL-0024-00 Zindco
fittings (Option 1)

0025 KHEP-MS-EL-0025-00 Panel boards (Option 1) ABB

Earthing Materials & Lightning Protection Products


0026 KHEP-MS-EL-0026-00 KINGSMILL
(Option2)
Earthing Materials & Lightning Protection Products
0026.1 KHEP-MS-EL-0026-01 KINGSMILL
(Addendum) (Option2)
Earthing Materials & Lightning Protection Products
0026.2 KHEP-MS-EL-0026-02 KINGSMILL
(Addendum) (Option2)
Earthing Materials & Lightning Protection Products
0026.3 KHEP-MS-EL-0026-03 KINGSMILL
(Addendum) (Option2)
0026.4 KHEP-MS-EL-0026-04 Earthing Materials & Lightning Protection Products KINGSMILL

Wiring Devices
0027 KHEP-MS-EL-0027-00 Option-1 MK-Honeywell

Wiring Devices
0027.1 KHEP-MS-EL-0027-01 Option-1 MK-Honeywell

Panel boards
0028 KHEP-MS-EL-0028-00 Schneider/ Mots
(Option 2)

0029 KHEP-MS-EL-0029-00 Data & Telephone system, IT Network (Option 1) Cisco

0029.1 KHEP-MS-EL-0029-01 Data & Telephone system, IT Network (Option 1) Cisco

0029.2 KHEP-MS-EL-0029-02 Data & Telephone system, IT Network (Option 1) Cisco

0029.3 KHEP-MS-EL-0029-03 Data & Telephone system, IT Network (Option 1) Cisco

Data & Telephone system, IT Network Active


0029.4 KHEP-MS-EL-0029-04 Cisco
Components (Option 1)
Medium Voltage Cable, Low Voltage cable,
0030 KHEP-MS-EL-0030-00 Al Fanar
Single core wire

0031 KHEP-MS-EL-0031-00 Earthing & Lightning Protection(Option 3) DEHN

Earthing & Lightning Protection (Addendum)


0031.1 KHEP-MS-EL-0031-01 DEHN
(Option 3)
Data & Telephone system, IT Network
0032 KHEP-MS-EL-0032-00 Cisco
(Option 2)

Data & Telephone system, IT Network


0032.1 KHEP-MS-EL-0032-01 Cisco
(Active)

Data & Telephone system, IT Network


0032.2 KHEP-MS-EL-0032-02 Cisco
(Active)
The Saudi
0033 KHEP-MS-EL-0033-00 Package Substation (Option 1) Transformers Co.Ltd
(STC)
0034 KHEP-MS-EL-0034-00 Electric Meter ( Option 1 ) Saudi Controls Ltd

0034.1 KHEP-MS-EL-0034-01 Electric Meter ( Option 1 ) Saudi Controls Ltd

0035 KHEP-MS-EL-0035-00 Package Substation (Option2) Al Fanar

0035.1 KHEP-MS-EL-0035-01 Package Substation Al Fanar

0036 KHEP-MS-EL-0036-00 Low Voltage Panel Board Al Fanar

Atif Issa Factory &


0037 KHEP-MS-EL-0037-00 Street Lighting pole
Partner Co.
Factory of Alnoor
0037.1 KHEP-MS-EL-0037-01 Street Lighting pole Alhady Company for
Energy
Factory of Alnoor
0037.2 KHEP-MS-EL-0037-02 Street Lighting pole Alhady Company for
Energy
Factory of Alnoor
0037.3 KHEP-MS-EL-0037-03 Street Lighting pole Alhady Company for
Energy
0038 KHEP-MS-EL-0038-00 Data & Telephone System, IT Network (Option 3) Cisco

Data & Telephone System, IT Network (Active Cisco / APC/


0038.1 KHEP-MS-EL-0038-01
Components, Ups & Cabinets) Chatsworth

Data & Telephone System, IT Network (Active Cisco / APC/


0038.2 KHEP-MS-EL-0038-02
Components, Ups & Cabinets) Chatsworth

0039 KHEP-MS-EL-0039-00 Cable Glands (Option 2) CMP-UK

0040 KHEP-MS-EL-0040-00 Cable Glands (Option 4) ACE Super Impex

0041 KHEP-MS-EL-0041-00 Cable Glands (Option 3) ATCAB

0042 KHEP-MS-EL-0042-00 Disconnect Switches GE

Electri - Flex & O-Z


0043 KHEP-MS-EL-0043-00 Flexible Conduit & Fittings
Gedney

1- Middle East Fiber


Cable Manufacturing
Co. MEFC (for Fiber
Optic Cable)
0044 KHEP-MS-EL-0044-00 Data & Telephone System Passive part
2- Commscope (for
Communication
Copper cable - cat6A
UTP)

1- Middle East Fiber


Cable Manufacturing
Co. MEFC (for Fiber
Optic Cable)
0044.1 KHEP-MS-EL-0044-01 Data & Telephone System Passive part
2- Commscope (for
Communication
Copper cable - cat6A
UTP)

0045 KHEP-MS-EL-0045-00 IP CCTV System PELCO - USA

0045.1 KHEP-MS-EL-0045-01 IP CCTV System PELCO - USA

Data & Telephone System Passive part


- Fiber Optic Cable & Accessories
0046 KHEP-MS-EL-0046-00 Commscope
- Cat6A Cable & Accessories
- Communication Faceplate & Connectors

Data & Telephone System Passive part -


Fiber Optic Cable & Accessories -
0046.1 KHEP-MS-EL-0046-01 Commscope
Cat6A Cable & Accessories -
Communication Faceplate & Connectors
Data & Telephone System Passive part -
Fiber Optic Cable & Accessories -
0046.2 KHEP-MS-EL-0046-02 Commscope
Cat6A Cable & Accessories -
Communication Faceplate & Connectors
Data & Telephone System Passive part -
Fiber Optic Cable & Accessories -
0046.3 KHEP-MS-EL-0046-03 Commscope
Cat6A Cable & Accessories -
Communication Faceplate & Connectors

0047 KHEP-MS-EL-0047-00 Electric Meter Meta Switchgear co


0048 KHEP-MS-EL-0048-00 LV Cable - LS0H for Indoor Bahra Cable

0049 KHEP-MS-EL-0049-00 Samples - Wiring Devices MK-Honeywell

0050 KHEP-MS-EL-0050-00 Low Voltage Single core wires - LS0H Bahra Cable

0051 KHEP-MS-EL-0051-00 Panelboard GEDAC

0052 KHEP-MS-EL-0052-00 PVC Spacers Bahra Cable Co

0053 KHEP-MS-EL-0053-00 LV Cables & Wires - Indoor & Outdoor Al Fanar

0053.1 KHEP-MS-EL-0053-01 LV Cables & Wires - Indoor & Outdoor Al Fanar

0054 KHEP-MS-EL-0054-00 MV Cable Al Fanar

0054.1 KHEP-MS-EL-0054-01 MV Cable Al Fanar

United Technology of
Electric Substation &
0055 KHEP-MS-EL-0055-00 Package Substation
Switchgears Co.
(USSG)

United Technology of
Electric Substation &
0055.1 KHEP-MS-EL-0055-01 Package Substation
Switchgears Co.
(USSG)

0056 KHEP-MS-EL-0056-00 Wiring Devices - ALF Range Contactum Alfanar

0057 KHEP-MS-EL-0057-00 IP CCTV System Axis

Cable Support System: Cable Trays & Cable


0058 KHEP-MS-EL-0058-00 Al-Amal Co
Ladders

0059 KHEP-MS-EL-0059-00 Wiring Devices Schneider (vivace)

Ercon Middle East


0060 KHEP-MS-EL-0060-00 Pullbox
Industries Saudia Co.

0061 KHEP-MS-EL-0061-00 Interior Lighting NATIONAL LIGHTING

0062 KHEP-MS-EL-0062-00 Package substation ABB

Al Zamil (SSP-OZG
0063 KHEP-MS-EL-0063-00 PVC Coated Conduit & Fittings
Wheatland)

0064 KHEP-MS-EL-0064-00 PVC Spacers Al Wasail Industrial Co

0065 KHEP-MS-EL-0065-00 Round Steel Lighting Pole GEDAC ELECTRIC

0065.1 KHEP-MS-EL-0065-01 Round Steel Lighting Pole GEDAC ELECTRIC

LOW CURRENT (TELECOME)


New Products
0000 KHEP-MA-27-0001-00 PVC Conduit, Fittings & Accessories
Industries Co.Ltd
0001 KHEP-MS-LC-0001-00 Fire Alarm Materials SIMPLEX

New Products
0002 KHEP-MS-LC-0002-00 HDPE Duct 32mm Industries Co.Ltd
(Neproplast)
HDPE Duct 32mm & Fittings - New Products
0002.1 KHEP-MS-LC-0002-01 Transition Fitting 32mm - Industries Co.Ltd
Coupler 32mm (Including 25mm & 50mm) (Neproplast)

HDPE Duct 32mm & Fittings For Duct : New


- Transition Fitting 32mm Products Industries
0002.2 KHEP-MS-LC-0002-02
- Coupler 32mm (Including 25mm & Co.Ltd (Neproplast)
50mm) For Fittings : Frialen

Ramees Co. for


0003 KHEP-MS-LC-0003-00 Telecom Manhole Contracting - Precast
Factory
Ramees Co. for
0003.1 KHEP-MS-LC-0003-01 Telecom Manhole Contracting - Precast
Factory
Ramees Co. for
0003.2 KHEP-MS-LC-0003-02 Telecom Manhole Contracting - Precast
Factory
Ramees Co. for
0003.3 KHEP-MS-LC-0003-03 Telecom Manhole Contracting - Precast
Factory
Conduit : STC-HDPE, SDR17, 32mm, Black Fittings:
HDPE, 32mm Transition Coupler Application: Conduit: Neproplast
0004 KHEP-MS-LC-0004-00
Communication - From Handhole to Telecom Fittings: Frialen
Cabinet Inside Villas
Edwards United
0005 KHEP-MS-LC-0005-00 Fire Alarm System Materials
Technologies

Edwards United
0005.1 KHEP-MS-LC-0005-01 Fire Alarm System Materials
Technologies

Alwasail Industrial
0006 KHEP-MS-LC-0006 HDPE Conduit & Accessories
Company

0007 KHEP-MS-LC-0007 Fire Alarm System Materials - Cables M/S B3 Cables

0007.1 KHEP-MS-LC-0007-01 Fire Alarm System Materials - Cables M/S B3 Cables

Alwasail Industrial
0008 KHEP-MS-LC-0008-00 HDPE Conduit 32mm & 25mm
Company

HVAC
Mueller Industries Inc.
0001 KHEP-MS-HVAC-0001-00 Refrigerant Pipework ASTM B280 (Copper)
USA

0002 KHEP-MS-HVAC-0002-00 Refrigerant Pipes Insulation Armacell (Armaflex)

Al Bawani Duct
0003 KHEP-MS-HVAC-0003-00 Duct Work (Duct & Accessories)
Factory Riyadh KSA

Al Bawani Duct
0003.1 KHEP-MS-HVAC-0003-01 Duct Work (Duct & Accessories)
Factory Riyadh KSA

Duct Work (Duct & Accessories) Al Bawani Duct


0003.2 KHEP-MS-HVAC-0003-02
(Addendum) Factory Riyadh KSA

Al Bawani Duct
0004 KHEP-MS-HVAC-0004-00 Duct Work (Duct Work Only)
Factory Riyadh KSA
0005 KHEP-MS-HVAC-0005-00 Fresh Air Handling Unit (FAHU) Zamil Air Conditioners

0006 KHEP-MS-HVAC-0006-00 VRF (Variable Refrigerant flow) System York

0007 KHEP-MS-HVAC-0007-00 Fresh Air Handling Unit (FAHU) York

0008 KHEP-MS-HVAC-0008-00 Variable Refrigerant Flow (VRF) LG

0008.1 KHEP-MS-HVAC-0008-01 Variable Refrigerant Flow (VRF) LG

0008.2 KHEP-MS-HVAC-0008-02 Variable Refrigerant Flow (VRF System) LG

0008.3 KHEP-MS-HVAC-0008-03 Variable Refrigerant Flow (VRF System) LG

0009 KHEP-MS-HVAC-0009-00 Air Terminal Devices (Grills & Diffuser) Gulf Grills Co

0009.1 KHEP-MS-HVAC-0009-01 Air Terminal Devices (Grills & Diffuse) Nteico

Addendum for Air Terminal Devices (Grills &


0009.2 KHEP-MS-HVAC-0009-02 Gulf Grills Co
Diffuses)

0010 KHEP-MS-HVAC-0010-00 Exhaust Fans Cook,USA

0010.1 KHEP-MS-HVAC-0010-01 Exhaust Fans Casals Fans

Greenheck Building
0011 KHEP-MS-HVAC-0011-00 Exhaust Fans
Value in Air

Greenheck Building
0011.1 KHEP-MS-HVAC-0011-01 Exhaust Fans
Value in Air

0012 KHEP-MS-HVAC-0012-00 Hangers & Supports (HVAC System) Solver

0012.1 KHEP-MS-HVAC-0012-01 Hangers & Supports (HVAC System) Solver

Flexible Duct, Duct insulation & Accessories - Afico, Supaflex &


0013 KHEP-MS-HVAC-0013-00
(HVAC) Durodyne

Gamma Line
0014 KHEP-MS-HVAC-0014-00 Air Terminal Devices (Grills & Diffusers)
International

0015 KHEP-MS-HVAC-0015-00 VRF (Variable Refrigerant flow) System Trane

0016 KHEP-MS-HVAC-0016-00 Exhaust Fans Casals Fans

0016.1 KHEP-MS-HVAC-0016-01 Exhaust Fans Casals Fans

Petra Engineering
0017 KHEP-MS-HVAC-0017-00 Fresh Air Package Unit
Industries co.

SKM Air Conditioning


0018 KHEP-MS-HVAC-0018-00 Fresh Air Package Unit
Co.

SKM Air Conditioning


0018.1 KHEP-MS-HVAC-0018-01 Fresh Air Package Unit
Co.

SKM Air Conditioning


0018.2 KHEP-MS-HVAC-0018-02 Fresh Air Package Unit
Co.

Carnes for Exhaust


0019 KHEP-MS-HVAC-0019-00 Toilet and Kitchen Exhaust Fans
fans

Carnes for Exhaust


0019.1 KHEP-MS-HVAC-0019-01 Toilet and Kitchen Exhaust Fans
fans

Exhaust Fans for Toilet & Laundry of All Clusters Carnes for Exhaust
0019.2 KHEP-MS-HVAC-0019-02
with Timer Switch (LEGRAND) fans
Mueller, Superlon,
0020 KHEP-MS-HVAC-0020-00 VRF System Accessories Neproplast, Easyfix,
Excel & Belden

Hanger & Support for HVAC Duct Works (SEC: 23


0021 KHEP-MS-HVAC-0021-00 Tembo Seven star
0528)

Hanger & Support for HVAC Duct Works (SEC: 23


0021.1 KHEP-MS-HVAC-0021-01 Tembo Seven star
0528)

MECHANICAL
Mariam Trading
0001 KHEP-MS-ME-0001-00 Pipe Support - Rubber Clamp
Company
Mariam Trading
0001.1 KHEP-MS-ME-0001-01 Pipe Support - Rubber Clamp
Company
1. Aljazera-Jasco
(Pipe) 2. Hitachi -
0002 KHEP-MS-ME-0002-00 ERW Pipe Galvanized SCH. 40 (GR.B)
(Fittings) 3.
Benken - (Fittings)

0003 KHEP-MS-ME-0003-00 Fire Extinguisher AMEREX

0003.1 KHEP-MS-ME-0003-01 Fire Extinguisher AMEREX

1. HITACHI
0004 KHEP-MS-ME-0004-00 Fire Protection pipe fittings
2. BENKEN

0005 KHEP-MS-ME-0005-00 Hanger & Support(Fire Protection) Solver

Pipe fittings 50mm & smaller Bis pipe fittings


0006 KHEP-MS-ME-0006-00
(fire protection) industry Co. LTD

Valves & Sprinklers, Section 21 0510 Fire


0007 KHEP-MS-ME-0007-00 Rapidrop
Protection

Sprinklers, Floor Control Valve Assembly, Test & Tyco,Mueller,Potter,A


0007.1 KHEP-MS-ME-0007-01
Drain Valve, Fire Extinguishers GF,Amerex
1. HITACHI Metals,
Ltd
Pipe and pipe fittings = 50mm smaller, Mechanical
0008 KHEP-MS-ME-0008-00 2.Weifang Yinuo
Coupling & Grooved End Fittings
Casting Co. Ltd

Tyco, Potter, Lifco &


0009 KHEP-MS-ME-0009-00 Fire Water Sprinkler & Fire Extinguisher
Cla-Val

0010 KHEP-MS-ME-0010-00 Hanger & Support for Fire Protection Etanco

0011 KHEP-MS-ME-0011-00 Hanger & Support for Fire Protection Tembo Seven star

Reliable, Sheild,
0012 KHEP-MS-ME-0012-00 Sprinkler System Potter, System
Sensor, Calval
Sprinkler System (Addendum)
0012.1 KHEP-MS-ME-0012-01 Naffco
01. Reliable Sheild

PLUMBING
UPVC Pipe & Fittings (Drainage System) Class 4,
0001 KHEP-MS-PL-0001-00 ALMUNIF PIPE MMP
SCH. 40

UPVC Pipe & Fittings (Drainage System) Class 4,


0001.1 KHEP-MS-PL-0001-01 ALMUNIF PIPE MMP
SCH. 40

UPVC Pipe Class 4 & Fittings (Drainage System)


0001.2 KHEP-MS-PL-0001-02 ALMUNIF PIPE MMP
mm

UPVC & Fittings (Drainage System) Class 4, SCH.


0002 KHEP-MS-PL-0002-00 SAPPCO
40

UPVC Fitting (Welded Joints) for Sappco Pipes


0002.1 KHEP-MS-PL-0002-01 Aplaco
Drainage System
UPVC & Fittings (Drainage System) Class 4, SCH.
0003 KHEP-MS-PL-0003-00 NEPROPLAST
40

0004 KHEP-MS-PL-0004-00 PPR Pipe & Fittings (Water System) 20 Bar ALMUNIF PIPE MMP

0005 KHEP-MS-PL-0005-00 UPVC Pipe Sleeve Class 4, SCH. 40 ALMUNIF PIPE MMP

Al-Jazera Factories
0005.1 KHEP-MS-PL-0005-01 Sleeve (Duct & Pipe) For steel Products Co.
Ltd ( JASCO )

0006 KHEP-MS-PL-0006-00 Pipe Support - Rubber Clamp Diamond

Mariam Trading
0007 KHEP-MS-PL-0007-00 Pipe Support - Rubber Clamp
Company

Upvc & PPR - Hanger and Support, for Plumbing Mariam Trading
0007.1 KHEP-MS-PL-0007-01
System Company

0008 KHEP-MS-PL-0008-00 UPVC Sleeve Pipe Class 5, SCH. 80 AL MUNIF PIPE MMP

Tahweel Plumbing
0009 KHEP-MS-PL-0009-00 PPR Pipe (Water Supply)
System

0010 KHEP-MS-PL-0010-00 Electrical Water Heater AO Smith

0011 KHEP-MS-PL-0011-00 Electrical Water Heater Bradford white Co.

0012 KHEP-MS-PL-0012-00 Hangers & Supports, Section 230528 Tembo Seven Star

Hangers & Supports, Section 230528 for Plumbing


0012.1 KHEP-MS-PL-0012-01 Tembo Seven Star
(Water & Drainage)

0013 KHEP-MS-PL-0013-00 UPVC, Solvent Cement & Cleaner Oatey (MMP)

UPVC, Condensate pipe & Water Heater Drain


0014 KHEP-MS-PL-0014-00 AL MUNIF PIPE MMP
(pipe & Fittings)
Drainage & Vent, Steel Equipment, Section 221424
0015 KHEP-MS-PL-0015-00 Zurn
for Plumbing (Drainage)

0016 KHEP-MS-PL-0016-00 Floor Drain, Roof Drain, Trench and Clean Out Saudi Cast

0016.1 KHEP-MS-PL-0016-01 Floor Drain, Roof Drain, Trench and Clean Out Saudi Cast

Floor Drain, Roof Drain, Floor Clean Out, and


0016.2 KHEP-MS-PL-0016-02 Saudi Cast
Gratings Channel

Floor Drain, Roof Drain, Floor Clean Out, and


0016.3 KHEP-MS-PL-0016-03 Saudi Cast
Gratings Channel

0017 KHEP-MS-PL-0017-00 Valve (Plumbing - Water) Hattersley

0017.1 KHEP-MS-PL-0017-01 Water Supply : Gate Valves, Check Valve, Strainer Hattersley

0017.2 KHEP-MS-PL-0017-02 Water Supply, Gate Valves Hattersley

0018 KHEP-MS-PL-0018-00 Electric Water Heater Saudi Ceramics

0019 KHEP-MS-PL-0019-00 Electric Water Heater Zenith Water Heater

Modern Time
0019.1 KHEP-MS-PL-0019-01 Electric Water Heater Technical System /
Rheem

Water Hammer Arrest or Hose Bibbs & Automatic


0020 KHEP-MS-PL-0020-00 Sealtech,Muller, Watts
Air Vent for Water Supply

Water Hammer Arrest or Hose Bibb & Automatic


0020.1 KHEP-MS-PL-0020-01 Sealtech,Muller, Watts
Air Vent for Water Supply
Water Hammer Arrest or Automatic Air Vent &
0021 KHEP-MS-PL-0021-00 Watts Regulator
Hose Bibbs

0022 KHEP-MS-PL-0022-00 Valves for Water Supply System Econosto Valves

0023 KHEP-MS-PL-0023-00 Hose Bibb Watts Regulator

0024 KHEP-MS-PL-0024-00 Hangers & Supports (PL Systems) Solver

0024.1 KHEP-MS-PL-0024-01 Hangers & Supports (PL Systems) Solver

0025 KHEP-MS-PL-0025-00 Hangers & Supports for Plumbing System Etanco

Drainage Piping Specialist (FD, RF,CO, GCH, &


0026 KHEP-MS-PL-0026-00 Josam
Covers)

0027 KHEP-MS-PL-0027-00 PPR Pipes & Fittings for Domestic Water System Cosmoplast

Diehl Metering /
0028 KHEP-MS-PL-0028-00 Smart Water Meter
Hydrus

Thermal closed cell elastomeric foam insulation for


PPR hot water supply pipes and condensate pvc
0029 KHEP-MS-PL-0029-00 Armacell (Armaflex)
pipes (for application in ceiling void and embedded
piping in wall)
Thermal closed cell Elastoplast foam insulation for
PPR hot water supply pipes and condensate pvc
0030 KHEP-MS-PL-0030-00 Insofex
pipes (for application in ceiling void and embedded
piping in wall)

0031 KHEP-MS-PL-0031-00 Plumbing Pipe Support Diamond Walraven

Accessories for pipe hangers & support -p


0032 KHEP-MS-PL-0032-00 plumbing system (Threaded rod-nuts-washrs- Tembo Seven Star
bolts….etc)

0033 KHEP-MS-PL-0033-00 Central Electric Water Heater State

Bronze Gate Valve (Size - As per Approved Shop


0034 KHEP-MS-PL-0034-00 AVK
Drawing)

Electric Water Heater for Public Toilets and


0035 KHEP-MS-PL-0035-00 State
Ancillary Building

Electric Water Heater for Public Toilets and


0035.1 KHEP-MS-PL-0035-01 State
Ancillary Building

Hot Water Circulating pump for central Electric


0036 KHEP-MS-PL-0036-00 Salmson
water heater
Hot Water Circulating pump for central Electric
Modern Time
0037 KHEP-MS-PL-0037-00 water heater
Technical System
1. Grundfos

STRUCTURAL

0001 KHEP-MA-03-0001-00 Epoxy Coated Reinforcement Steel

Bawan Metal
0001.1 KHEP-MS-ST-0001-01 Epoxy Coated Reinforcement Steel
Industries
0002 KHEP-MA-03-0002-00 Hessian Cloth/Burlap
Burlap Polyethylene Sheets: 1. Mohanjute
0002.1 KHEP-MS-ST-0002-01 1.Jute Hessian Cloth 2.Issam Kabbani
2.Polyethelene sheets (100 Micron) (IKK)

0003 KHEP-MA-07-0004-00 Polyethylene Sheet


0004 KHEP-MA-03-0003-00 Formworks; Plywood Freco Limited
Saudi ReadyMix
0005 KHEP-MA-03-0004-00 Concrete: Ready-Mix
Concrete Co. Ltd.

0006 KHEP-MA-07-0001-00 Bituminuos Paint

0007 KHEP-MA-31-0001-00 Termite Control

0008 KHEP-MA-03-0005-00 Curing Compound

0009 KHEP-MS-ST-0006-00 Light Weight Foam Concrete (Roofing System) Aercel

Al Fozan Building
0010 KHEP-MS-ST-0007-00 Tie Wire (Elector Galvanized)
Materials Co.

0011 KHEP-MS-ST-0008-00 Bituminous paint: CICO-Bitumen-WB60 CIC

ABNI (Ali Al-Masaad


Concrete: Ready-Mix Option 2 (ABNI Aali Al-
00012 KHEP-MS-ST-0009-00 Co. For Producing
Masaad Co. For Producing building Marerials)
building Marerials)

ABNI (Ali Al-Masaad


00012.1 KHEP-MS-ST-0009-01 Concrete: Ready-Mix Co. For Producing
building Marerials)

Fosam Company
0013 KHEP-MS-ST-0010-00 Form Release Agent
Limited

0014 KHEP-MS-ST-0011-00 Isolation Joint Filler Board IKK (Unitech)


0015 KHEP-MS-ST-0012-00 Isolation Joint Sealant IKK (Unitech)

Fosam Company
0015.1 KHEP-MS-ST-0012-01 Isolation Joint Sealant
Limited (FOSROC)

0016 KHEP-MS-ST-0013-00 Backing Rod IKK (UniPro)

0017 KHEP-MS-ST-0014-00 Concrete Repairs Renderoc FC FOSROC

0018 KHEP-MS-ST-0015-00 Concrete Repairs SIKA REP 100 SIKA Company Ltd.

0019 KHEP-MS-ST-0016-00 Concrete Repairs SIKA REP FINE SIKA Company Ltd.

Fosam Company
0020 KHEP-MS-ST-0017-00 Grout (Lokfix)
Limited (FOSROC)

0021 KHEP-MS-ST-0018-00 Formworks Accessories Atco Constructions

Bonding Agent (Nitobond EP & AR), Structural


Repairs (Renderoc LA Xtra), Mortar Repair System Fosam Company
0022 KHEP-MS-ST-0019-00
(Renderoc HS Xtra), Concrete & Masonary Repair Limited (FOSROC)
(Renderoc TG
Al Fozan Building
0023 KHEP-MS-ST-0020-00 Welded Wire Mesh
Materials Co.

Al Fozan Building
0024 KHEP-MS-ST-0021-00 Tie Wire (PVC or Electro Galvanized)
Materials Co.

0025 KHEP-MS-ST-0022-00 Epoxy Coated Reinforcement Steel Rajhi Steel

0025.1 KHEP-MS-ST-0022-01 Reinforcement Steel Rajhi Steel

CONCRETE REPAIRS: HENKEL POLYBIT


0026 KHEP-MS-ST-0023-00
1.POLYCRETE ST INDUSTRIES LTD.
CONCRETE REPAIRS HENKEL POLYBIT
0027 KHEP-MS-ST-0024-00
1.POLYCRETE FC INDUSTRIES LTD.

CONCRETE REPAIRS HENKEL POLYBIT


0028 KHEP-MS-ST-0025-00
1.POLYBOND AC INDUSTRIES LTD.

Dermabit
0029 KHEP-MS-ST-0026-00 Bituminous Damp Proofing DermaDamp Waterproofing
Industries
Awazel-Arabian
0030 KHEP-MS-ST-0027-00 Bituminous Damp Proofing Awazel Damp Coat Waterproofing
Industries Co.
WAMCO (Wadi
0031 KHEP-MS-ST-0028-00 Isolation Joint Filler Board Maramer Trading
Group)
DCP (Don
0032 KHEP-MS-ST-0029-00 Curing Compound Construction
Products)

0033 KHEP-MS-ST-0030-00 Isolation Joint Filler Board Steico

0034 KHEP-MS-ST-0031-00 Backing Rod Wamco

Al - Bassami Group
0035 KHEP-MS-ST-0032-00 Concrete Ready Mix
Co.

Al - Bassami Group
0035.1 KHEP-MS-ST-0032-01 Concrete Ready Mix
Co.

Al - Tawi Ready Mix


0036 KHEP-MS-ST-0033-00 Concrete Ready Mix Concrete & Cement
Products Co

Al - Tawi Ready Mix


0036.1 KHEP-MS-ST-0033-01 Concrete Ready Mix Concrete & Cement
Products Co

Fosam Company
0037 KHEP-MS-ST-0034-00 Bituminous paint: Nitoproof 10
Limited (FOSROC)

Grout Sodamco Weber


0038 KHEP-MS-ST-0035-00
Product Name : Webertec 301 (Saint Gobain)

Bituminous paint Weber Sodamco


0039 KHEP-MS-ST-0036-00
Weberdry Bitum WB (Saint Gobain)

Isolation Joint Sealant Weber Sodamco


0040 KHEP-MS-ST-0037-00
Weber Silicone AC (Saint Gobain)

Curing Compound Weber Sodamco


0041 KHEP-MS-ST-0038-00
Weberad Cury Y 20 (Saint Gobain)

Bonding Agent Weberad Weber Sodamco


0042 KHEP-MS-ST-0039-00
225 MB (latex based) (Saint Gobain)

Concrete Repair Weberep Weber Sodamco


0043 KHEP-MS-ST-0040-00
350 NSG (Non Shrink Mortar for Repair) (Saint Gobain)

Concrete Repair Weberep


Weber Sodamco
0044 KHEP-MS-ST-0041-00 ST (Non Metallic Non Shrink Fiber Reinforced
(Saint Gobain)
Repair Mortar)
A Approved

B Approved w/ Comments

C Revise & Resubmit

E Rejected
SUBMITTED FOR RESPONDED AS
VENDOR DATE SUBMITTED DISCIPLINE DATE RESPONDED
CODE STATUS CODE STATUS

Al Rajhi Holding Approved w/


Jeddah KSA
11-Mar-2017 Architectural 1 Approval 19-Mar-2017 B comments

Saudi Ready Mix Approved w/


Concrete Co. Ltd.
11-Mar-2017 Architectural 1 Approval 13-Mar-2017 B comments

SAPPCO-TEXACO
Approved w/
Insuation Products 12-Mar-2017 Architectural 1 Approval 14-Mar-2017 B comments
Co. Ltd.
ALAMDAR
Approved w/
VAPOTHERM CO. 12-Mar-2017 Architectural 1 Approval 14-Mar-2017 B comments
LTD

Sulieman A. R. Approved w/
Namlah Factory
12-Mar-2017 Architectural 1 Approval 14-Mar-2017 B comments

Middle East Metal &


Wood Industries co. Approved w/
Ltd. (METALCO) -
14-Mar-2017 Architectural 1 Approval 20-Mar-2017 B comments
Riyadh

Rollc For Trading Co.


Ltd. Jeddah
14-Mar-2017 Architectural 1 Approval 18-Mar-2017 E Rejected

Al Bawani Casework Revise &


factory Riyadh, KSA
14-Mar-2017 Architectural 1 Approval 19-Mar-2017 C Resubmit

Al Bawani Casework Approved w/


factory Riyadh, KSA
23-Jul-2017 Architectural 1 Approval 26-Jul-2017 B comments

Al Bawani Casework Revise &


factory Riyadh, KSA
8-Nov-2017 Architectural 1 Approval 19-Nov-2017 C Resubmit
Isam Kabbani &
Partners Jeddah, 15-Mar-2017 Architectural 1 Approval 18-Mar-2017 A Approved
KSA
Isam Kabbani &
Approved w/
Partners Jeddah, 16-Mar-2017 Architectural 1 Approval 21-Mar-2017 B comments
KSA

Professional Builders Approved w/


Co. Riyadh, KSA
21-Mar-2017 Architectural 1 Approval 29-Mar-2017 B comments

Professional Builders Approved w/


Co. Riyadh, KSA
21-Mar-2017 Architectural 1 Approval 29-Mar-2017 B comments

RAMZ CO. FOR


Approved w/
METAL IND. Riyadh, 21-Mar-2017 Architectural 1 Approval 29-Mar-2017 B comments
KSA

RAMZ CO. FOR


Approved w/
METAL IND. Riyadh, 18-Nov-2017 Architectural 1 Approval 18-Dec-2017 B comments
KSA

Professional Builders Approved w/


Co. Riyadh, KSA
21-Mar-2017 Architectural 1 Approval 29-Mar-2017 B comments

Approved w/
GALCO Riyadh, KSA 9-Nov-2017 Architectural 1 Approval 19-Nov-2017 B comments

RAMZ CO. FOR


Revise &
METAL IND. Riyadh, 22-Mar-2017 Architectural 1 Approval 29-Mar-2017 C Resubmit
KSA

RAMZ CO. FOR


Revise &
METAL IND. Riyadh, 11-Apr-2017 Architectural 1 Approval 23-May-2017 C Resubmit
KSA

Mada Gypsum
Yanbu, KSA
23-Mar-2017 Architectural 1 Approval 4-Apr-2017 A Approved

Western Burkani Approved w/


Block Factory
26-Mar-2017 Architectural 1 Approval 1-Apr-2017 B comments
Ali Almsaad Co. For
Approved w/
Producing Building 29-Mar-2017 Architectural 1 Approval 5-Apr-2017 B comments
Materials (ABNI)

KNF Block Factory Approved w/


Jeddah, KSA
29-Mar-2017 Architectural 1 Approval 5-Apr-2017 B comments

USG Middle East, Ltd Approved w/


Jeddah, Saudi Arabia
30-Mar-2017 Architectural 1 Approval 5-Apr-2017 B comments

ABSAR Co. Ltd Revise &


Jeddah, KSA
1-Apr-2017 Architectural 1 Approval 4-Apr-2017 C Resubmit

ABSAR Co. Ltd


Jeddah, KSA
29-May-2017 Architectural 1 Approval 13-Jun-2017 A Approved

ABSAR Co. Ltd Revise &


Jeddah, KSA
11-Jul-2017 Architectural 1 Approval 12-Jul-2017 C Resubmit

Station for
Approved w/
Contracting Co. Ltd 11-Apr-2017 Architectural 1 Approval 13-Apr-2017 B comments
Jeddah,KSA
Station for
Approved w/
Contracting Co. Ltd 11-Apr-2017 Architectural 1 Approval 13-Apr-2017 B comments
Jeddah,KSA

UNITED MINING
Approved w/
INDUSTRIES 16-Apr-2017 Architectural 1 Approval 30-Apr-2017 B comments
JEDDAH, KSA

Station for
Contracting Co. Ltd 17-Apr-2017 Architectural 1 Approval 29-Apr-2017 E Rejected
Jeddah,KSA

AL JAZEERA PAINTS Approved w/


JEDDAH,KSA
17-Apr-2017 Architectural 1 Approval 29-Apr-2017 B comments

Sika Saudi Arabia Approved w/


Co. Ltd.
20-Apr-2017 Architectural 1 Approval 29-Apr-2017 B comments

Sika Saudi Arabia Approved w/


Co. Ltd.
20-Apr-2017 Architectural 1 Approval 29-Apr-2017 B comments

Sika Saudi Arabia Approved w/


Co. Ltd.
20-Apr-2017 Architectural 1 Approval 29-Apr-2017 B comments

Ikk Group of
Approved w/
Companies 22-Apr-2017 Architectural 1 Approval 2-May-2017 B comments
Jeddah,Saudi Arabia

Binex Jeddah, Saudi Approved w/


Arabia
22-Apr-2017 Architectural 1 Approval 2-May-2017 B comments

ROOTS GROUP
Approved w/
Jeddah, Saudi Arabia 26-Apr-2017 Architectural 1 Approval 30-May-2017 B comments

Jotun Jeddah, Saudi Approved w/


Arabia
29-Apr-2017 Architectural 1 Approval 10-May-2017 B comments

Jotun Jeddah, Saudi Approved w/


Arabia
7-Dec-2017 Architectural 1 Approval 12-Dec-2017 B comments

Jotun Jeddah, Saudi Approved w/


Arabia
29-Apr-2017 Architectural 1 Approval 10-May-2017 B comments
AL JAZEERA
Approved w/
JEDDAH,Saudi 29-Apr-2017 Architectural 1 Approval 10-May-2017 B comments
Arabia

Saveto construction Approved w/


materials
29-Apr-2017 Architectural 1 Approval 10-May-2017 B comments

Saveto construction Approved w/


materials
29-Apr-2017 Architectural 1 Approval 10-May-2017 B comments

TECHNI PROOF
Waterproofing &
Thermal Insulation
4-May-2017 Architectural 1 Approval 22-May-2017 E Rejected
Specialist

Revise &
BASF 7-May-2017 Architectural 1 Approval 20-May-2017 C Resubmit

Revise &
BASF 7-May-2017 Architectural 1 Approval 20-May-2017 C Resubmit

Saudi Etqaan Co. Approved w/


Riyad KSA
8-May-2017 Architectural 1 Approval 24-May-2017 B comments

Revise &
Binex 9-May-2017 Architectural 1 Approval 20-May-2017 C Resubmit

Approved w/
Binex 6-Jul-2017 Architectural 1 Approval 12-Jul-2017 B comments

Revise &
HEMPEL 14-May-2017 Architectural 1 Approval 20-May-2017 C Resubmit
Revise &
HEMPEL 14-May-2017 Architectural 1 Approval 20-May-2017 C Resubmit

Approved w/
Binex Jeddah, KSA 23-May-2017 Architectural 1 Approval 5-Jun-2017 B comments

Don Construction Approved w/


Specialties Ltd (DCP)
4-Jun-2017 Architectural 1 Approval 11-Jun-2017 B comments

Approved w/
AL Safwa 5-Jun-2017 Architectural 1 Approval 11-Jun-2017 B comments
Sika Saudi Arabia
Co. Ltd.
5-Jun-2017 Architectural 1 Approval 11-Jun-2017 A Approved

GLOBAL ALUMINUM
SYSTEMS CO. LTD. Revise &
Riyadh, KSA
7-Jun-2017 Architectural 1 Approval 13-Jun-2017 C Resubmit

GLOBAL ALUMINUM
SYSTEMS CO. LTD. Revise &
Riyadh, KSA
8-Nov-2017 Architectural 1 Approval 19-Nov-2017 C Resubmit

GLOBAL ALUMINUM
SYSTEMS CO. LTD. Revise &
Riyadh, KSA
26-Dec-2017 Architectural 1 Approval 30-Dec-2017 C Resubmit

AL HAYAT
Revise &
BUILDING 11-Jun-2017 Architectural 1 Approval 14-Jun-2017 C Resubmit
MATERIALS CO.

Rollc For Trading Co. Revise &


Ltd. Jeddah
14-Jun-2017 Architectural 1 Approval 3-Jul-2017 C Resubmit

Rollc For Trading Co. Approved w/


Ltd. Jeddah
2-Aug-2017 Architectural 1 Approval 20-Aug-2017 B comments

Rollc For Trading Co. Approved w/


Ltd. Jeddah
20-Nov-2017 Architectural 1 Approval 23-Nov-2017 B comments

Ebaa House for


Revise &
Ceramic & Marble 14-Jun-2017 Architectural 1 Approval 22-Jun-2017 C Resubmit
Co. Riyadh,KSA.
Ebaa House for
Approved w/
Ceramic & Marble 17-Aug-2017 Architectural 1 Approval 23-Aug-2017 B comments
Co. Riyadh,KSA.
Lovely Building
Revise &
Materials Industrial 17-Jun-2017 Architectural 1 Approval 22-Jun-2017 C Resubmit
Co.LTD.
Dupont corian Revise &
interiors
18-Jun-2017 Architectural 1 Approval 22-Jun-2017 C Resubmit
Revise &
China Pearl 18-Jun-2017 Architectural 1 Approval 22-Jun-2017 C Resubmit

Approved w/
TOB China 19-Jun-2017 Architectural 1 Approval 23-Aug-2017 B comments

Forsan Ceramics Revise &


Riyadh,KSA
20-Jun-2017 Architectural 1 Approval 22-Jun-2017 C Resubmit

Forsan Ceramics Approved w/


Riyadh,KSA
17-Aug-2017 Architectural 1 Approval 28-Aug-2017 B comments
Absar Co. Ltd Revise &
Jeddah,KSA
21-Jun-2017 Architectural 1 Approval 12-Jul-2017 C Resubmit

Absar Co Ltd Jeddah Revise &


KSA
10-Aug-2017 Architectural 1 Approval 14-Sep-2017 C Resubmit

Absar Co Ltd Jeddah Approved w/


KSA
27-Sep-2017 Architectural 1 Approval 28-Sep-2017 B comments

Modern Reality Approved w/


Factory
21-Jun-2017 Architectural 1 Approval 12-Jul-2017 B comments

EMPOLO SANITARY Revise &


WARE
22-Jun-2017 Architectural 1 Approval 12-Jul-2017 C Resubmit

Al Hayata Building Revise &


Materials Co.
19-Jul-2017 Architectural 1 Approval 27-Jul-2017 C Resubmit

Approved w/
Ibrahim Shaker 10-Jul-2017 Architectural 1 Approval 26-Jul-2017 B comments

Binex Jeddah, Saudi Approved w/


Arabia
13-Jul-2017 Architectural 1 Approval 19-Jul-2017 B comments

ABSAR Co. Ltd Revise &


Jeddah, KSA
13-Jul-2017 Architectural 1 Approval 19-Jul-2017 C Resubmit
ABSAR Co. Ltd
Jeddah, KSA
23-Aug-2017 Architectural 1 Approval 14-Sep-2017 A Approved

Revise &
Sham net Trading 15-Jul-2017 Architectural 1 Approval 26-Jul-2017 C Resubmit
Revise &
SHAM NET TRADING 23-Oct-2017 Architectural 1 Approval 12-Nov-2017 C Resubmit

Approved w/
SHAM NET TRADING 5-Dec-2017 Architectural 1 Approval 21-Dec-2017 B comments

Revise &
Sham net Trading 16-Jul-2017 Architectural 1 Approval 26-Jul-2017 C Resubmit

EZZ Al - Bahr co Revise &


Jeddah, KSA
22-Jul-2017 Architectural 1 Approval 26-Jul-2017 C Resubmit

Approved w/
6-Aug-2017 Architectural 1 Approval 7-Aug-2017 B comments

Approved w/
Alusystme 9-Aug-2017 Architectural 1 Approval 28-Aug-2017 B comments

CCCI Consultant
Creative for
Revise &
Construction 10-Aug-2017 Architectural 1 Approval 14-Sep-2017 C Resubmit
Industry Riyadh,
KSA

Approved w/
Ardh Al-Injaz Est 13-Aug-2017 Architectural 1 Approval 18-Sep-2017 B comments

Integrated Wood
Revise &
Industries Riyadh, 20-Aug-2017 Architectural 1 Approval 14-Sep-2017 C Resubmit
KSA

Alazzaz Co.Ltd 28-Aug-2017 Architectural 1 Approval 30-Aug-2017 A Approved

Al Bawani Casework Approved w/


factory Riyadh, KSA
30-Aug-2017 Architectural 1 Approval 28-Sep-2017 B comments
Al Bawani Casework Approved w/
factory Riyadh, KSA
8-Nov-2017 Architectural 1 Approval 26-Nov-2017 B comments

DCP Saudi Riyad,


KSA
17-Sep-2017 Architectural 1 Approval 24-Sep-2017 A Approved

FOSROC Riyad, KSA 17-Sep-2017 Architectural 1 Approval 21-Sep-2017 E Rejected

ZAGZOOG for home


Revise &
Appliances Jeddah, 18-Sep-2017 Architectural 1 Approval 28-Sep-2017 C Resubmit
KSA

Approved w/
WAMCO 21-Sep-2017 Architectural 1 Approval 28-Sep-2017 B comments

Tameem M.Bin
Revise &
Ashry EST. Riyadh 21-Sep-2017 Architectural 1 Approval 2-Oct-2017 C Resubmit
KSA.
Isam Kabbani &
Partners Co. LTD. 26-Sep-2017 Architectural 1 Approval 2-Oct-2017 A Approved
Riyadh, KSA

Approved w/
Binex 28-Sep-2017 Architectural 1 Approval 7-Oct-2017 B comments

Approved w/
Binex 28-Sep-2017 Architectural 1 Approval 4-Oct-2017 B comments

Approved w/
Binex 28-Sep-2017 Architectural 1 Approval 4-Oct-2017 B comments

Bawani Duct Factory 3-Oct-2017 Architectural 1 Approval 9-Oct-2017 E Rejected

Engineering Domain Approved w/


Riyadh, KSA
5-Oct-2017 Architectural 1 Approval 19-Oct-2017 B comments

Engineering Domain Approved w/


Riyadh, KSA
27-Nov-2017 Architectural 1 Approval 4-Dec-2017 B comments

Bawani & Kabbani


Revise &
Specialized Co. 10-Oct-2017 Architectural 1 Approval 25-Oct-2017 C Resubmit
Riyadh KSA
Bawani & Kabbani
Specialized Co. 26-Nov-2017 Architectural 1 Approval 29-Nov-2017 A Approved
Riyadh KSA

Revise &
Donglong China 30-Oct-2017 Architectural 1 Approval 5-Nov-2017 C Resubmit

Approved w/
Awal Bath Systems 4-Nov-2017 Architectural 1 Approval 12-Nov-2017 B comments

Revise &
Penta 4-Nov-2017 Architectural 1 Approval 12-Nov-2017 C Resubmit

Approved w/
GALCO Riyadh, KSA 8-Nov-2017 Architectural 1 Approval 19-Nov-2017 B comments

Approved w/
GALCO Riyadh, KSA 8-Nov-2017 Architectural 1 Approval 19-Nov-2017 B comments

Approved w/
GALCO Riyadh, KSA 8-Nov-2017 Architectural 1 Approval 19-Nov-2017 B comments

Approved w/
GALCO Riyadh, KSA 8-Nov-2017 Architectural 1 Approval 19-Nov-2017 B comments

Approved w/
GALCO Riyadh, KSA 9-Nov-2017 Architectural 1 Approval 19-Nov-2017 B comments
BAWANI CASEWORK Approved w/
FACTORY
9-Nov-2017 Architectural 1 Approval 26-Nov-2017 B comments

BAWANI CASEWORK Revise &


FACTORY
28-Dec-2017 Architectural 1 Approval 2-Jan-2018 C Resubmit

Revise &
GALCO Riyadh, KSA 9-Nov-2017 Architectural 1 Approval 19-Nov-2017 C Resubmit

Approved w/
SAUDI CERAMIC 13-Nov-2017 Architectural 1 Approval 4-Dec-2017 B comments

AL BASSAMI GROUP Approved w/


CO.
13-Nov-2017 Architectural 1 Approval 19-Nov-2017 B comments

BPC – BUILDING
PRODUCT CO. Approved w/
JEDDAH, KSA
13-Nov-2017 Architectural 1 Approval 20-Nov-2017 B comments
Asiklar Bldg. Product Revise &
Architon
14-Nov-2017 Architectural 1 Approval 19-Nov-2017 C Resubmit

Ramz co. for Metal Approved w/


Ind.
26-Nov-2017 Architectural 1 Approval 30-Nov-2017 B comments

EBAA House for


Approved w/
Ceramic & Marble 26-Nov-2017 Architectural 1 Approval 19-Dec-2017 B comments
Co. Riyadh,KSA.

Bawani CaSEWORK
Approved w/
FACTORY Riyadh, 27-Nov-2017 Architectural 1 Approval 4-Dec-2017 B comments
KSA

Jotun Paints Jeddah, Approved w/


KSA
29-Nov-2017 Architectural 1 Approval 4-Dec-2017 B comments

Al Tawi 29-Nov-2017 Architectural 1 Approval 4-Dec-2017 A Approved

Arbian Building
Chemical Factory 5-Dec-2017 Architectural 1 Approval 18-Dec-2017 E Rejected
Jeddah KSA

Approved w/
Alshawaf Int'l Co 18-Dec-2017 Architectural 1 Approval 25-Dec-2017 B comments

Approved w/
Alshawaf Int'l. Co 21-Dec-2017 Architectural 1 Approval 25-Dec-2017 B comments

Approved w/
Alshawaf Int'l. Co 20-Feb-2018 Architectural 1 Approval 24-Feb-2018 B comments

Bawani & Kabbani


Revise &
Specialized Co. 26-Dec-2017 Architectural 1 Approval 30-Dec-2017 C Resubmit
Riyadh KSA
Bawani & Kabbani
Approved w/
Specialized Co. 22-Jan-2018 Architectural 1 Approval 27-Jan-2018 B comments
Riyadh KSA

Ramz Co. For Metal Revise &


IND Riyadh KSA
26-Dec-2017 Architectural 1 Approval 30-Dec-2017 C Resubmit

Bawani & Kabbani


Revise &
Specialized Co. 26-Dec-2017 Architectural 1 Approval 30-Dec-2017 C Resubmit
Riyadh KSA

Bawani & Kabbani


Approved w/
Specialized Co. 22-Jan-2018 Architectural 1 Approval 27-Jan-2018 B comments
Riyadh KSA
Saveto Construction
Materials
26-Dec-2017 Architectural 1 Approval 30-Dec-2017 E Rejected

Alshawaf Revise &


International. Co
28-Dec-2017 Architectural 1 Approval 4-Jan-2018 C Resubmit

Revise &
Al Shawaf Int'l. Co. 6-Jan-2018 Architectural 1 Approval 15-Jan-2018 C Resubmit
ALAMDAR
VAPOTHERM CO. 7-Jan-2018 Architectural 1 Approval 15-Jan-2018 E Rejected
LTD

Blue Guard 7-Jan-2018 Architectural 1 Approval 15-Jan-2018 E Rejected

Isam Kabbani & Approved w/


Partners
7-Jan-2018 Architectural 1 Approval 20-Jan-2018 B comments

United Mining
Approved w/
Industries 22-Jan-2018 Architectural 1 Approval 27-Jan-2018 B comments
Jeddah

Blue Guard 27-Jan-2018 Architectural 1 Approval 30-Jan-2018 A Approved

Wunsch Plaster
Factory
6-Feb-2018 Architectural 1 Approval 12-Feb-2018 A Approved

Wunsch Plaster
Factory
6-Feb-2018 Architectural 1 Approval 12-Feb-2018 A Approved

Alshawaf Int'l. Co 11-Feb-2018 Architectural 1 Approval

Al Ghamdi Co.
26-Feb-2018 Architectural 1 Approval
IDEAL

1 - Neprolast
2-
Approved w/
Sappco 23-Jan-2017 Civil 1 Approval 31-Jan-2017 B comments
3 - Al-
Tamam

Al Ismael Plastic Approved w/


Factory
21-Mar-2017 Civil 1 Approval 26-Mar-2017 B comments

WAMCO ( Wadi
Revise &
Maramer Trading 23-Feb-2017 Civil 1 Approval 27-Feb-2017 C Resubmit
Group)
Revise &
Gurbetciler 28-Feb-2017 Civil 1 Approval 2-Mar-2017 C Resubmit

Approved w/
6-Mar-2017 Civil 1 Approval 7-Mar-2017 B comments

1. Future Pipe,
Approved w/
27-Feb-2017 Civil 1 Approval 1-Mar-2017 B comments
2.
Almadarat Pipe
Revise &
ALMUNIF PIPE MMP 12-Mar-2017 Civil 1 Approval 14-Mar-2017 C Resubmit

ALMUNIF PIPE MMP 22-Mar-2017 Civil 1 Approval 28-Mar-2017 E Rejected

Approved w/
AL MUNIF PIPE 10-Apr-2017 Civil 1 Approval 13-Apr-2017 B comments
Revise &
Amiantit 22-Jan-2017 Civil 1 Approval 31-Jan-2017 C Resubmit

Approved w/
ALMUNIF PIPE 22-Mar-2017 Civil 1 Approval 27-Mar-2017 B comments

Revise &
Saudi Cast 22-Apr-2017 Civil 1 Approval 1-May-2017 C Resubmit

Saudi Cast 3-May-2017 Civil 1 Approval 20-May-2017 A Approved

Al Ismail Plastic Approved w/


Factory
26-Apr-2017 Civil 1 Approval 4-May-2017 B comments

Approved w/
Neproplast 29-Apr-2017 Civil 1 Approval 4-May-2017 B comments

Future Pipe Approved w/


Industries
29-Apr-2017 Civil 1 Approval 10-May-2017 B comments

Ramees est. for


contracting precast 1-May-2017 Civil 1 Approval 17-May-2017 E Rejected
factory

Nagadi preformed
concrete factory
1-May-2017 Civil 1 Approval 14-May-2017 E Rejected

Revise &
Al Munif 3-May-2017 Civil 1 Approval 22-May-2017 C Resubmit

Approved w/
Al Munif 25-May-2017 Civil 1 Approval 30-May-2017 B comments

Approved w/
Texofib 8-May-2017 Civil 1 Approval 20-May-2017 B comments

Saudi Valve
Revise &
Manufacturing 11-May-2017 Civil 1 Approval 17-May-2017 C Resubmit
( AVK)
Saudi Valve
Approved w/
Manufacturing 6-Jun-2017 Civil 1 Approval 15-Jun-2017 B comments
( AVK)
Saudi Valve
Revise &
Manufacturing 22-May-2017 Civil 1 Approval 25-May-2017 C Resubmit
( AVK)
Saudi Valve
Manufacturing 31-May-2017 Civil 1 Approval 3-Jun-2017 A Approved
( AVK)

Al Wasail 22-May-2017 Civil 1 Approval 25-May-2017 E Rejected

Approved w/
Al Wasail 1-Jun-2017 Civil 1 Approval 4-Jun-2017 B comments

Revise &
AL Munif 23-May-2017 Civil 1 Approval 25-May-2017 C Resubmit

Approved w/
AL Munif 27-May-2017 Civil 1 Approval 3-Jun-2017 B comments

Global Source Approved w/


Company
25-May-2017 Civil 1 Approval 8-Jun-2017 B comments

Approved w/
Elift Arabian Factory 27-May-2017 Civil 1 Approval 8-Jun-2017 B comments

Technofiber 4-Jun-2017 Civil 1 Approval 13-Jun-2017 A Approved


Global Source Revise &
Trading Est.
4-Jun-2017 Civil 1 Approval 12-Jun-2017 C Resubmit
Revise &
Riyadh Foundry Co 4-Jun-2017 Civil 1 Approval 12-Jun-2017 C Resubmit
Ferrotech
International Fze.
4-Jun-2017 Civil 1 Approval 12-Jun-2017 A Approved

Al Munif 5-Jun-2017 Civil 1 Approval 12-Jun-2017 E Rejected


Approved w/
Al Munif 17-Sep-2017 Civil 1 Approval 19-Sep-2017 B comments

Isam Kabani Ikk - Approved w/


Unitech
8-Jun-2017 Civil 1 Approval 14-Jun-2017 B comments

Isam Kabani Ikk - Approved w/


Unitech
20-Jul-2017 Civil 1 Approval 5-Aug-2017 B comments

Gulf Meters Factory 11-Jun-2017 Civil 1 Approval 15-Jun-2017 E Rejected

Mashail Future Revise &


Trading
22-Jun-2017 Civil 1 Approval 11-Jul-2017 C Resubmit

Isam Kabani Ikk - Revise &


Unitech
29-Jun-2017 Civil 1 Approval 10-Jul-2017 C Resubmit
Isam Kabani Ikk -
Unitech
13-Jul-2017 Civil 1 Approval 18-Jul-2017 A Approved

Saudi Valve
Revise &
Manufacturing 5-Jul-2017 Civil 1 Approval 10-Jul-2017 C Resubmit
( AVK)
Saudi Valve
Manufacturing 13-Jul-2017 Civil 1 Approval 1-Aug-2017 A Approved
( AVK)

Revise &
Sika 25-Jul-2017 Civil 1 Approval 29-Jul-2017 C Resubmit

Approved w/
Sika 6-Aug-2017 Civil 1 Approval 7-Aug-2017 B comments

Approved w/
Basf 25-Jul-2017 Civil 1 Approval 31-Jul-2017 B comments

Approved w/
Basf 25-Jul-2017 Civil 1 Approval 31-Jul-2017 B comments

Approved w/
Basf 27-Jul-2017 Civil 1 Approval 31-Jul-2017 B comments

Revise &
Basf 27-Jul-2017 Civil 1 Approval 31-Jul-2017 C Resubmit

Basf 6-Aug-2017 Civil 1 Approval 7-Aug-2017 A Approved

Revise &
Basf 27-Jul-2017 Civil 1 Approval 31-Jul-2017 C Resubmit

Revise &
Basf 6-Aug-2017 Civil 1 Approval 7-Aug-2017 C Resubmit

Basf 13-Aug-2017 Civil 1 Approval 15-Aug-2017 A Approved

DCP 16-Aug-2017 Civil 1 Approval 19-Aug-2017 A Approved

Approved w/
DCP 23-Aug-2017 Civil 1 Approval 26-Aug-2017 B comments

DCP 23-Aug-2017 Civil 1 Approval 26-Aug-2017 A Approved

DCP 23-Aug-2017 Civil 1 Approval 26-Aug-2017 A Approved

DCP 23-Aug-2017 Civil 1 Approval 26-Aug-2017 A Approved

Basf 6-Sep-2017 Civil 1 Approval 12-Sep-2017 A Approved

Revise &
ABNI 42999 Civil ### Approval 26-Sep-2017 C Resubmit
Saudi Cyprus Approved w/
Foundries (SCF)
23-Oct-2017 Civil 1 Approval 28-Oct-2017 B comments

Approved w/
IFCO 23-Oct-2017 Civil 1 Approval 28-Oct-2017 B comments

Revise &
Naffco 4-Nov-2017 Civil 1 Approval 8-Nov-2017 C Resubmit

Al Muzini, Authorized Revise &


by Bellinturf
18-Nov-2017 Civil 1 Approval 20-Dec-2017 C Resubmit

Saudi Valve
Revise &
Manufacturing 29-Nov-2017 Civil 1 Approval 7-Dec-2017 C Resubmit
( SVM)
Saudi Valve
Revise &
Manufacturing 17-Dec-2017 Civil 1 Approval 21-Dec-2017 C Resubmit
( SVM)
Saudi Valve
Approved w/
Manufacturing 28-Dec-2017 Civil 1 Approval 3-Jan-2018 B comments
( SVM)
Saudi Valve
Approved w/
Manufacturing 13-Jan-2018 Civil 1 Approval 20-Jan-2018 B comments
( SVM)
AL Khamisain Revise &
Hardware Trading
5-Dec-2017 Civil 1 Approval 10-Dec-2017 C Resubmit

AL Khamisain Approved w/
Hardware Trading
28-Dec-2017 Civil 1 Approval 1-Jan-2018 B comments

Future pipe Revise &


industries (FPI)
5-Dec-2017 Civil 1 Approval 16-Dec-2017 C Resubmit

Future pipe Approved w/


industries (FPI)
23-Dec-2017 Civil 1 Approval 3-Jan-2018 B comments

Texofib 12-Dec-2017 Civil 1 Approval 16-Dec-2017 A Approved

FOSROC 18-Dec-2017 Civil 1 Approval 19-Dec-2017 E Rejected

Approved w/
SODAMCO 18-Dec-2017 Civil 1 Approval 19-Dec-2017 B comments

Approved w/
Al Fanar 21-Jan-2018 Civil 1 Approval 25-Jan-2018 B comments

1- Al Abdul Karim
Holding Co

2- Saudi Electric Revise &


Supply Co
22-Jan-2017 Electrical 1 Approval 31-Jan-2017 C Resubmit

3- Al-Fozan
Electrical Materials

1-Al Abdul Karin


Holding Co

2-Saudi Electric
SupplyCo.
15-Apr-2017 Electrical 1 Approval 20-Apr-2017 E Rejected
3. Al
Fozan Electrical
Materials

Bahra 6-Aug-2017 Electrical 1 Approval 9-Aug-2017 E Rejected

Bahra Cable 15-Oct-2017 Electrical 1 Approval 18-Oct-2017 A Approved

Saudi Cable Revise &


Company
23-Jan-2017 Electrical 1 Approval 31-Jan-2017 C Resubmit
National Marketing
Est Co.Ltd
26-Jan-2017 Electrical 1 Approval 31-Jan-2017 A Approved

1- A.A.Turki
Corporation 2- Al
Abdulkarim Holding
26-Jan-2017 Electrical 1 Approval 31-Jan-2017 A Approved
Co.

Khereji Showroom Approved w/


Co. Ltd
28-Jan-2017 Electrical 1 Approval 31-Jan-2017 B comments

National Marketing
Est Co.Ltd
28-Jan-2017 Electrical 1 Approval 31-Jan-2017 A Approved

Bahra Cables Approved w/


Company
23-Oct-2017 Electrical 1 Approval 26-Oct-2017 B comments

1-Saudi Electric
Supply Co.
Approved w/
2-Abdul Karin 2-Mar-2017 Electrical 1 Approval 8-Mar-2017 B comments
Holding Co
3-Abdul Karin
Holding Co

Saudi Electric Supply Approved w/


& Co.
22-Feb-2017 Electrical 1 Approval 27-Feb-2017 B comments

1-Saudi Electric
SupplyCo.

2-Saudi Electric
Revise &
SupplyCo. 2-Mar-2017 Electrical 1 Approval 8-Mar-2017 C Resubmit
3-Abdul
Karin Holding Co
4-Abdul Karin
Holding Co

Saudi Electric Supply Revise &


& Co. (SESCO)
11-May-2017 Electrical 1 Approval 23-May-2017 C Resubmit

Saudi Electric Supply


& Co. (SESCO)
24-May-2017 Electrical 1 Approval 28-May-2017 A Approved

1-Saudi Electric
SupplyCo.
2-Electric Approved w/
House
2-Mar-2017 Electrical 1 Approval 8-Mar-2017 B comments
3-Saudi Electric
Supply Co.

Abdul Karim
Holding Co.
7-Mar-2017 Electrical 1 Approval 15-Mar-2017 E Rejected

Abdul Karim Holding Revise &


Co.
7-Mar-2017 Electrical 1 Approval 15-Mar-2017 C Resubmit

Abdul Karim Holding Approved w/


Co.
27-Apr-2017 Electrical 1 Approval 4-May-2017 B comments

Revise &
Electric House 7-Mar-2017 Electrical 1 Approval 15-Mar-2017 C Resubmit

Approved w/
Electric House 27-Apr-2017 Electrical 1 Approval 4-May-2017 B comments

1. Electric House
Revise &
2. Abdul 7-Mar-2017 Electrical 1 Approval 15-Mar-2017 C Resubmit
Karim Holding Co.

Approved w/
Tabalasa 23-May-2017 Electrical 1 Approval 25-May-2017 B comments
1. AlAbdul
KarimHoldingCo.
2. Saudi Revise &
Electri Supply&Co.
8-Mar-2017 Electrical 1 Approval 15-Mar-2017 C Resubmit
3. Al Fozan
Electrical Materials

Spectra 15-Mar-2017 Electrical 1 Approval 26-Mar-2017 E Rejected

Al Abdulkarim Approved w/
Holding Co.
6-Aug-2017 Electrical 1 Approval 9-Aug-2017 B comments

Khereji Showroom Revise &


Co. Ltd
16-Mar-2017 Electrical 1 Approval 21-Mar-2017 C Resubmit

Khereji Showroom Approved w/


Co. Ltd
12-Jun-2017 Electrical 1 Approval 15-Jun-2017 B comments

1) Thomas & Betts


2) Revise &
Abdul Karim Holding
16-Mar-2017 Electrical 1 Approval 21-Mar-2017 C Resubmit
Co.
Faheem Bakshs Revise &
Trading Estimate
15-Jul-2017 Electrical 1 Approval 18-Jul-2017 C Resubmit
Faheem Bakshs Revise &
Trading Estimate
30-Sep-2017 Electrical 1 Approval 7-Oct-2017 C Resubmit
MK 29-Mar-2017 Electrical 1 Approval 4-Apr-2017 A Approved
NATIONAL Revise &
LIGHTING
29-Mar-2017 Electrical 1 Approval 10-Apr-2017 C Resubmit
Revise &
Hrfa Special Skills 16-Jul-2017 Electrical 1 Approval 26-Aug-2017 C Resubmit

Approved w/
Hrfa Special Skills 17-Oct-2017 Electrical 1 Approval 25-Oct-2017 B comments

Approved w/
Hrfa Special Skills 30-Oct-2017 Electrical 1 Approval 3-Dec-2017 B comments

Approved w/
HRFA Special Skills 31-Dec-2017 Electrical 1 Approval 20-Jan-2018 B comments

Sela PASS 19-Apr-2017 Electrical 1 Approval 22-May-2017 E Rejected

Approved w/
12-Feb-2017 Electrical 1 Approval 18-Feb-2017 B comments

Ssaudi Electric
Supply & Co.
12-Feb-2017 Electrical 1 Approval 18-Feb-2017 A Approved

1) Al Fozan Electrical
Materials
2) Al
Abdul Karim Holding 22-Apr-2017 Electrical 1 Approval 29-Apr-2017 E Rejected
Co.
3)Saudi
electric supply & Co.

Approved w/
Saudi Powertec. 24-Apr-2017 Electrical 1 Approval 18-May-2017 B comments

Energy Shields 24-Apr-2017 Electrical 1 Approval 22-May-2017 E Rejected

Energy Shields 30-May-2017 Electrical 1 Approval 31-May-2017 E Rejected

Revise &
Energy Shields 29-Jun-2017 Electrical 1 Approval 5-Jul-2017 C Resubmit
Revise &
Energy Shields 5-Oct-2017 Electrical 1 Approval 18-Oct-2017 C Resubmit
Approved w/
Energy Shields 27-Nov-2017 Electrical 1 Approval 27-Dec-2017 B comments

1-Khereiji
showrooms co. ltd.
2-Radya
International
25-Apr-2017 Electrical 1 Approval 4-May-2017 E Rejected
3-Al Abdulkarim
Holding Co.

1-Khereiji
showrooms co. ltd.
2-Radya Approved w/
International
27-May-2017 Electrical 1 Approval 31-May-2017 B comments
3-Al Abdulkarim
Holding Co.

Approved w/
Schneider/ Mots 29-Apr-2017 Electrical 1 Approval 18-May-2017 B comments

Approved w/
OSOS 4-May-2017 Electrical 1 Approval 27-May-2017 B comments

Revise &
OSOS 12-Jun-2017 Electrical 1 Approval 8-Jul-2017 C Resubmit
Revise &
OSOS 17-Jul-2017 Electrical 1 Approval 11-Sep-2017 C Resubmit

Approved w/
OSOS 6-Nov-2017 Electrical 1 Approval 2-Jan-2018 B comments

OSOS 13-Jan-2018 Electrical 1 Approval 24-Jan-2018 A Approved

Al Fanar 4-May-2017 Electrical 1 Approval 25-May-2017 E Rejected

Revise &
ITMS 7-May-2017 Electrical 1 Approval 23-May-2017 C Resubmit

ITMS 30-May-2017 Electrical 1 Approval 1-Jun-2017 A Approved

For
Hoshan 8-May-2017 Electrical 1 Approval 27-May-2017 D Information

Approved w/
Hoshan 22-Nov-2017 Electrical 1 Approval 7-Dec-2017 B comments

Hoshan 7-Feb-2018 Electrical 1 Approval 21-Feb-2018 A Approved

The Saudi
Transformers Co.Ltd 9-May-2017 Electrical 1 Approval 25-May-2017 E Rejected
(STC)
Saudi Controls Ltd 11-May-2017 Electrical 1 Approval 29-May-2017 E Rejected
Revise &
Saudi Controls Ltd 7-Aug-2017 Electrical 1 Approval 29-Aug-2017 C Resubmit
Al Fanar 20-May-2017 Electrical 1 Approval 25-May-2017 E Rejected

Approved w/
Al Fanar 6-Dec-2017 Electrical 1 Approval 20-Jan-2018 B comments

Approved w/
Al Fanar 15-May-2017 Electrical 1 Approval 18-May-2017 B comments

Atif Issa Factory &


Partner Co.
22-May-2017 Electrical 1 Approval 29-May-2017 E Rejected

Factory of Alnoor
Revise &
Alhady Company for 6-Jun-2017 Electrical 1 Approval 11-Jun-2017 C Resubmit
Energy
Factory of Alnoor
Revise &
Alhady Company for 23-Jul-2017 Electrical 1 Approval 3-Aug-2017 C Resubmit
Energy
Factory of Alnoor
Approved w/
Alhady Company for 22-Nov-2017 Electrical 1 Approval 7-Dec-2017 B comments
Energy
Arab Builders for
Telecommunication For
& Security Services
23-May-2017 Electrical 2 Information 27-May-2017 D Information
(ABTSS)

Approved w/
ABTSS 22-Nov-2017 Electrical 1 Approval 13-Dec-2017 B comments

ABTSS 27-Jan-2018 Electrical 1 Approval 21-Feb-2018 A Approved

Faheem Bakshs Approved w/


Trading
5-Jun-2017 Electrical 1 Approval 13-Jun-2017 B comments

Specialize Symbol Approved w/


Company Ltd.
6-Jun-2017 Electrical 1 Approval 14-Jun-2017 B comments

Faheem Bakshs Approved w/


Trading
6-Jun-2017 Electrical 1 Approval 14-Jun-2017 B comments

Al Abdulkarim
Holding Co.
7-Jun-2017 Electrical 1 Approval 14-Jun-2017 A Approved

Al Abdulkarim Approved w/
Holding Co.
18-Jun-2017 Electrical 1 Approval 4-Jul-2017 B comments

Revise &
OSOS 6-Aug-2017 Electrical 1 Approval 22-Aug-2017 C Resubmit

Approved w/
OSOS 18-Dec-2017 Electrical 1 Approval 27-Dec-2017 B comments

Revise &
ISSA Telecom 6-Aug-2017 Electrical 1 Approval 9-Aug-2017 C Resubmit

Approved w/
ISSA Telecom 10-Sep-2017 Electrical 1 Approval 17-Sep-2017 B comments

EW Expertsways 10-Aug-2017 Electrical 1 Approval 24-Aug-2017 E Rejected

Revise &
EW Expertsways 9-Sep-2017 Electrical 1 Approval 27-Sep-2017 C Resubmit

Revise &
EW Expertsways 17-Oct-2017 Electrical 1 Approval 31-Oct-2017 C Resubmit

Approved w/
EW Expertsways 18-Dec-2017 Electrical 1 Approval 1-Jan-2018 B comments

Meta Switchgear co 10-Aug-2017 Electrical 1 Approval 26-Aug-2017 E Rejected


Approved w/
Bahra Cable 27-Aug-2017 Electrical 1 Approval 13-Sep-2017 B comments

Approved w/
MK-Honeywell 27-Aug-2017 Electrical 1 Approval 19-Sep-2017 B comments

Approved w/
Bahra Cable 27-Aug-2017 Electrical 1 Approval 13-Sep-2017 B comments

Approved w/
GEDAC 19-Sep-2017 Electrical 1 Approval 30-Sep-2017 B comments

Bahra Cable Co 24-Sep-2017 Electrical 1 Approval 27-Sep-2017 A Approved

Revise &
Al Fanar 27-Sep-2017 Electrical 1 Approval 4-Oct-2017 C Resubmit

Approved w/
Al Fanar 5-Dec-2017 Electrical 1 Approval 24-Dec-2017 B comments

Al Fanar 27-Sep-2017 Electrical 1 Approval 4-Oct-2017 E Rejected

Approved w/
Al Fanar 29-Oct-2017 Electrical 1 Approval 7-Nov-2017 B comments

United Technology
of Electric
Revise &
Substation & 43037 Electrical ### Approval 4-Nov-2017 C Resubmit
Switchgears Co.
(USSG)

United Technology
of Electric
Approved w/
Substation & 43076 Electrical ### Approval 19-Dec-2017 B comments
Switchgears Co.
(USSG)

Approved w/
Contactum Alfanar 30-Oct-2017 Electrical 1 Approval 15-Nov-2017 B comments

Revise &
Axis 2-Nov-2017 Electrical 1 Approval 11-Dec-2017 C Resubmit

Al-Amal Co 4-Nov-2017 Electrical 1 Approval 16-Nov-2017 A Approved

A.Abunayyan Revise &


Trading
7-Nov-2017 Electrical 1 Approval 15-Nov-2017 C Resubmit
Ercon Middle East
Approved w/
Industries Saudia 13-Nov-2017 Electrical 1 Approval 14-Nov-2017 B comments
Co.

NATIONAL Revise &


LIGHTING
15-Nov-2017 Electrical 1 Approval 3-Dec-2017 C Resubmit

Approved w/
ABB 26-Nov-2017 Electrical 1 Approval 23-Dec-2017 B comments

Al Zamil (SSP-OZG
Wheatland)
16-Dec-2017 Electrical 1 Approval 24-Dec-2017 A Approved

Al Wasail Industrial
Co
16-Dec-2017 Electrical 1 Approval 24-Dec-2017 A Approved

Al Salem Lighting Revise &


Co.
31-Dec-2017 Electrical 1 Approval 11-Jan-2018 C Resubmit
Al Salem Lighting
Co.
7-Feb-2018 Electrical 1 Approval 11-Jan-2018 A Approved

National Marketing
Est Co.Ltd
26-Jan-2017 Telecom 1 Approval 31-Jan-2017 A Approved
Revise &
SETRA 19-Apr-2017 Low Current 1 Approval 7-May-2017 C Resubmit

National Marketing Revise &


Est Co.Ltd
8-Jun-2017 Low Current 1 Approval 19-Jun-2017 C Resubmit

National Marketing Revise &


Est Co.Ltd
4-Jul-2017 Low Current 1 Approval 8-Jul-2017 C Resubmit

National Marketing Revise &


Est Co.Ltd
20-Aug-2017 Low Current 1 Approval 26-Aug-2017 C Resubmit

Ramees Co. for


Approved w/
Contracting - Precast 7-Aug-2017 Low Current 1 Approval 16-Aug-2017 B comments
Factory
Ramees Co. for
Revise &
Contracting - Precast 21-Sep-2017 Low Current 1 Approval 2-Oct-2017 C Resubmit
Factory
Ramees Co. for
Contracting - Precast 16-Dec-2017 Low Current 1 Approval 27-Dec-2017 E Rejected
Factory
Ramees Co. for
Contracting - Precast 22-Jan-2018 Low Current 1 Approval 31-Jan-2018 A Approved
Factory

Approved w/
Neproplast 27-Aug-2017 Low Current 1 Approval 11-Sep-2017 B comments

Edwards United Revise &


Technologies
12-Sep-2017 Low Current 1 Approval 28-Sep-2017 C Resubmit

Edwards United Approved w/


Technologies
23-Jan-2018 Low Current 1 Approval 31-Jan-2018 B comments

Alwasail Industrial Revise &


Company
26-Dec-2017 Low Current 1 Approval 4-Jan-2018 C Resubmit

ITMS Information
Tecnology Revise &
Management
28-Dec-2017 Low Current 1 Approval 3-Jan-2018 C Resubmit
Services Co. Ltd
ITMS Information
Tecnology
Management
24-Jan-2018 Low Current 1 Approval 28-Jan-2018 A Approved
Services Co. Ltd

Alwasail Industrial
Company
15-Feb-2018 Low Current 1 Approval 21-Feb-2018 A Approved

Elbadr Industrial
Revise &
Supplier (Jeddah 19-Mar-2017 HVAC 1 Approval 23-Mar-2017 C Resubmit
KSA)
Mariam Trading Revise &
Company
19-Mar-2017 HVAC 1 Approval 23-Mar-2017 C Resubmit

Al Bawani Duct Approved w/


Factory Riyadh KSA
21-Mar-2017 HVAC 1 Approval 27-Mar-2017 B comments

Al Bawani Duct Approved w/


Factory Riyadh KSA
24-Apr-2017 HVAC 1 Approval 30-Apr-2017 B comments

Al Bawani Duct
Factory Riyadh KSA
15-May-2017 HVAC 1 Approval 21-May-2017 A Apporved

Al Bawani Duct
Factory Riyadh KSA
15-May-2017 HVAC 1 Approval 22-May-2017 A Apporved
Zamil Air
Conditioners
7-Jun-2017 HVAC 1 Approval 3-Jul-2017 E Rejected

Alsalem Johnson
Controls
7-Jun-2017 HVAC 1 Approval 5-Jul-2017 E Rejected

Alsalem Johnson Revise &


Controls
7-Jun-2017 HVAC 1 Approval 3-Jul-2017 C Resubmit
Al-Hassan G.I Revise &
Shaker Co.
8-Jun-2017 HVAC 1 Approval 6-Jul-2017 C Resubmit
Al-Hassan G.I Revise &
Shaker Co.
28-Oct-2017 HVAC 1 Approval 8-Nov-2017 C Resubmit
Al-Hassan G.I Revise &
Shaker Co.
26-Nov-2017 HVAC 1 Approval 10-Dec-2017 C Resubmit

Al-Hassan G.I Approved w/


Shaker Co.
28-Dec-2017 HVAC 1 Approval 3-Jan-2018 B comments

Revise &
Gulf Grills Co 10-Jun-2017 HVAC 1 Approval 19-Jun-2017 C Resubmit
Engineering Supplies Revise &
Est.
2-Aug-2017 HVAC 1 Approval 7-Aug-2017 C Resubmit
Revise &
Gulf Grills Co 9-Aug-2017 HVAC 1 Approval 14-Aug-2017 C Resubmit
Revise &
Fawaz Co 18-Jun-2017 HVAC 1 Approval 9-Jul-2017 C Resubmit
Three Elements Revise &
Trading Est
2-Aug-2017 HVAC 1 Approval 7-Aug-2017 C Resubmit
Al Saadeh Trading Revise &
Est.
20-Jun-2017 HVAC 1 Approval 9-Jul-2017 C Resubmit

Al Saadeh Trading Approved w/


Est.
28-Oct-2017 HVAC 1 Approval 1-Nov-2017 B comments

Solver 18-Jul-2017 HVAC 1 Approval 22-Jul-2017 E Rejected

Approved w/
Solver 12-Aug-2017 HVAC 1 Approval 20-Aug-2017 B comments

M.M.seiary Trading
Est.
25-Jul-2017 HVAC 1 Approval 27-Jul-2017 A Apporved

Gamma Line Approved w/


International
10-Aug-2017 HVAC 1 Approval 20-Aug-2017 B comments

Revise &
Dallah Trading co 10-Aug-2017 HVAC 1 Approval 16-Aug-2017 C Resubmit
Three Elements Revise &
Trading Est
10-Aug-2017 HVAC 1 Approval 15-Aug-2017 C Resubmit
Three Elements Revise &
Trading Est
11-Nov-2017 HVAC 1 Approval 16-Nov-2017 C Resubmit
M/S Khalid asad
Revise &
jamjoom 23-Oct-2017 HVAC 1 Approval 4-Nov-2017 C Resubmit
Commercial Est.

M/S MB Climate Revise &


Control LLC,
12-Dec-2017 HVAC 1 Approval 24-Dec-2017 C Resubmit

M/S MB Climate Revise &


Control LLC,
11-Jan-2018 HVAC 1 Approval 22-Jan-2018 C Resubmit

M/S MB Climate Approved w/


Control LLC,
7-Feb-2018 HVAC 1 Approval 21-Feb-2018 B comments

Joint Gulf Business Revise &


Group for Fan
16-Dec-2017 HVAC 1 Approval 19-Dec-2017 C Resubmit

Joint Gulf Business Revise &


Group for Fan
4-Jan-2018 HVAC 1 Approval 15-Jan-2018 C Resubmit

Joint Gulf Business Approved w/


Group for Fan
11-Feb-2018 HVAC 1 Approval 19-Feb-2018 B comments
Al-Hassan G.I Approved w/
Shaker Co.
9-Jan-2018 HVAC 1 Approval 22-Jan-2018 B comments

Moudi A. Al- Ajmi Revise &


Trading Est.
11-Jan-2018 HVAC 1 Approval 20-Jan-2018 C Resubmit

Moudi A. Al- Ajmi Approved w/


Trading Est.
23-Jan-2018 HVAC 1 Approval 29-Jan-2018 B comments

Mariam Trading Revise &


Company
19-Mar-2017 Mechanical 1 Approval 23-Mar-2017 C Resubmit
Mariam Trading Revise &
Company
27-Mar-2017 Mechanical 1 Approval 29-Mar-2017 C Resubmit

Pan Gulf Piping Approved w/


System
27-Mar-2017 Mechanical 1 Approval 2-Apr-2017 B comments

Revise &
AMEREX 5-Apr-2017 Mechanical 1 Approval 12-Apr-2017 C Resubmit

Approved w/
AMEREX 18-May-2017 Mechanical 1 Approval 24-May-2017 B comments

1. HITACHI
Revise &
2. 10-Apr-2017 Mechanical 1 Approval 12-Apr-2017 C Resubmit
BENKEN

Approved w/
Solver 19-Apr-2017 Mechanical 1 Approval 23-Apr-2017 B comments

Bis pipe fittings Approved w/


industry Co. LTD
29-Apr-2017 Mechanical 1 Approval 3-May-2017 B comments

Dylan Al-Zahrah Revise &


Trading Co. Ltd
15-May-2017 Mechanical 1 Approval 5-Jun-2017 C Resubmit

Pan Gulf Industrial Revise &


Systems co.
3-Aug-2017 Mechanical 1 Approval 14-Aug-2017 C Resubmit

Dylan Al-Zahrah Approved w/


Trading Co. Ltd
15-May-2017 Mechanical 1 Approval 31-May-2017 B comments

Saudi Factory for Revise &


Equipment
18-Jun-2017 Mechanical 1 Approval 4-Jul-2017 C Resubmit
Al-Hayat Building Revise &
Materials Co.
20-Jul-2017 Mechanical 1 Approval 3-Aug-2017 C Resubmit

Moudi A. Al- Ajmi Approved w/


Trading Est.
20-Jul-2017 Mechanical 1 Approval 3-Aug-2017 B comments

Approved w/
Naffco 31-Oct-2017 Mechanical 1 Approval 8-Nov-2017 B comments

Naffco 27-Feb-2018 Mechanical 1 Approval

Revise &
ALMUNIF PIPE MMP 12-Mar-2017 Plumbing 1 Approval 15-Mar-2017 C Resubmit

Approved w/
ALMUNIF PIPE MMP 22-Mar-2017 Plumbing 1 Approval 27-Mar-2017 B comments

Approved w/
ALMUNIF PIPE MMP 6-Jul-2017 Plumbing 1 Approval 11-Jul-2017 B comments

Approved w/
SAPPCO 12-Mar-2017 Plumbing 1 Approval 15-Mar-2017 B comments

Approved w/
Aplaco, Sappco 6-Jul-2017 Plumbing 1 Approval 11-Jul-2017 B comments
Revise &
NEPROPLAST 12-Mar-2017 Plumbing 1 Approval 14-Mar-2017 C Resubmit

Approved w/
ALMUNIF PIPE MMP 12-Mar-2017 Plumbing 1 Approval 15-Mar-2017 B comments

Revise &
ALMUNIF PIPE MMP 12-Mar-2017 Plumbing 1 Approval 14-Mar-2017 C Resubmit

Al-Jazera Factories
For steel Products 22-Mar-2017 Plumbing 1 Approval 26-Mar-2017 A Approved
Co. Ltd ( JASCO )

Universal Building
Material
19-Mar-2017 Plumbing 1 Approval 27-Mar-2017 E Rejected

Mariam Trading
Company
19-Mar-2017 Plumbing 1 Approval 27-Mar-2017 E Rejected

Mariam Trading Approved w/


Company
14-Jun-2017 Plumbing 1 Approval 3-Jul-2017 B comments

AL MUNIF PIPE MMP 22-Mar-2017 Plumbing 1 Approval 27-Mar-2017 A Approved

Tahweel Integrated
Company
25-Mar-2017 Plumbing 1 Approval 29-Mar-2017 A Approved

Mechanical &
Revise &
Chemical Supplies 27-Mar-2017 Plumbing 1 Approval 29-Mar-2017 C Resubmit
Co. (MCC)
Revise &
Binex 16-Apr-2017 Plumbing 1 Approval 18-Apr-2017 C Resubmit

Dylan Al-Zahrah Approved w/


Trading Co. Ltd
15-May-2017 Plumbing 1 Approval 24-May-2017 B comments

Approved w/
Dylan Co.Ltd 6-Jun-2017 Plumbing 1 Approval 13-Jun-2017 B comments

Munir Almunif Pipe


(MMP)
27-May-2017 Plumbing 1 Approval 30-May-2017 A Approved

AL MUNIF PIPE MMP 28-May-2017 Plumbing 1 Approval 31-May-2017 A Approved

UBM 7-Jun-2017 Plumbing 1 Approval 19-Jun-2017 E Rejected

Revise &
Saudi Cast 8-Jun-2017 Plumbing 1 Approval 19-Jun-2017 C Resubmit
Revise &
Saudi Cast 26-Jul-2017 Plumbing 1 Approval 7-Aug-2017 C Resubmit
Revise &
Saudi Cast 20-Aug-2017 Plumbing 1 Approval 28-Aug-2017 C Resubmit

Approved w/
Saudi Cast 4-Nov-2017 Plumbing 1 Approval 12-Nov-2017 B comments

Moudi A.Al-Ajmi
Trading Est.
8-Jun-2017 Plumbing 1 Approval 3-Jul-2017 E Rejected

Moudi A.Al-Ajmi Revise &


Trading Est.
20-Aug-2017 Plumbing 1 Approval 28-Aug-2017 C Resubmit
Moudi A.Al-Ajmi
Trading Est.
7-Sep-2017 Plumbing 1 Approval 20-Sep-2017 A Approved

Saudi Ceramics 12-Jun-2017 Plumbing 1 Approval 11-Jul-2017 E Rejected

Binex 12-Jun-2017 Plumbing 1 Approval 15-Jun-2017 E Rejected

Modern Time
Revise &
Technical System / 3-Aug-2017 Plumbing 1 Approval 8-Aug-2017 C Resubmit
Rheem

Approved w/
Binex 18-Jun-2017 Plumbing 1 Approval 6-Jul-2017 B comments

Binex 10-Jul-2017 Plumbing 1 Approval 17-Jul-2017 A Approved


Ahamed A. Alhashim Approved w/
Sons Co & Partner
20-Jun-2017 Plumbing 1 Approval 6-Jul-2017 B comments

Revise &
Econosto Valves 1-Jul-2017 Plumbing 1 Approval 8-Jul-2017 C Resubmit

Ahamed A. Alhashim
Sons Co & Partner
10-Jul-2017 Plumbing 1 Approval 17-Jul-2017 E Rejected

solver 18-Jul-2017 Plumbing 1 Approval 22-Jul-2017 E Rejected

Approved w/
solver 12-Aug-2017 Plumbing 1 Approval 20-Aug-2017 B comments

Al-Hayat Building
Materials Co.
20-Jul-2017 Plumbing 1 Approval 27-Jul-2017 A Approved

Revise &
Josam 20-Jul-2017 Plumbing 1 Approval 27-Jul-2017 C Resubmit
Revise &
Cosmoplast 13-Aug-2017 Plumbing 1 Approval 16-Aug-2017 C Resubmit

A.Abunayyan Approved w/
Trading Corp
20-Aug-2017 Plumbing 1 Approval 29-Aug-2017 B comments

Mariam Trading Revise &


Company
7-Sep-2017 Plumbing 1 Approval 11-Sep-2017 C Resubmit

Mariam Trading Approved w/


Company (MTC)
17-Sep-2017 Plumbing 1 Approval 19-Sep-2017 B comments

AL Shaye Group Revise &


Trading Co.
19-Sep-2017 Plumbing 1 Approval 27-Sep-2017 C Resubmit

Moudi A.Al-Ajmi Approved w/


Trading Est.
3-Sep-2017 Plumbing 1 Approval 11-Oct-2017 B comments

Enjaz Commercial Approved w/


Company Ltd
28-Oct-2017 Plumbing 1 Approval 6-Nov-2017 B comments

Saudi Valve
Manufacturing Co.
14-Nov-2017 Plumbing 1 Approval 16-Nov-2017 A Approved

Enjaz Commercial Revise &


Company Ltd
12-Dec-2017 Plumbing 1 Approval 19-Dec-2017 C Resubmit

Enjaz Commercial Approved w/


Company Ltd
4-Jan-2018 Plumbing 1 Approval 16-Jan-2018 B comments

Enjaz Commercial Revise &


Company Ltd
13-Dec-2017 Plumbing 1 Approval 19-Dec-2017 C Resubmit

Modern Time Revise &


Technical System
1-Feb-2018 Plumbing 1 Approval 13-Feb-2018 C Resubmit

1-Attien Steel
Company Ltd 2-
Bawan Metal
Approved w/
Industries 3- 19-Jan-2017 Structural 1 Approval 30-Jan-2017 B comments
Brc Industrial
Company 4-
Steefco
Bawan Metal
Industries
18-Mar-2017 Structural 1 Approval 21-Mar-2017 A Approved

Mohanjute 19-Jan-2017 Structural 1 Approval 30-Jan-2017 E Rejected


1. Mohanjute
Approved w/
2.Issam Kabbani 29-Apr-2017 Structural 1 Approval 7-May-2017 B comments
(IKK)

Approved w/
19-Jan-2017 Structural 1 Approval 30-Jan-2017 B comments
Al-Fozan 24-Jan-2017 Structural 1 Approval 26-Jan-2017 A Approved
Saudi ReadyMix
Concrete Co. Ltd.
24-Jan-2017 Structural 1 Approval 30-Jan-2017 A Approved

1- Sika Saudiarabia
Co.Ltd Approved w/
2-
24-Jan-2017 Structural 1 Approval 26-Jan-2017 B comments
Aqua Shielo bx

Approved w/
25-Jan-2017 Structural 1 Approval 30-Jan-2017 B comments

26-Jan-2017 Structural 1 Approval 30-Jan-2017 A Approved


Bawani & Kabbani
Specialised
23-Oct-2017 Structural 1 Approval 25-Oct-2017 A Approved

Salman Al Khaldi Approved w/


Trading EST.
26-Oct-2017 Structural 1 Approval 31-Oct-2017 B comments

Approved w/
CIC 29-Oct-2017 Structural 1 Approval 31-Oct-2017 B comments

ABNI (Ali Al-Masaad


Approved w/
Co. For Producing 16-Feb-2017 Structural 1 Approval 21-Feb-2017 B comments
building Marerials)

ABNI (Ali Al-Masaad


Co. For Producing 22-Apr-2017 Structural 1 Approval 29-Apr-2017 A Approved
building Marerials)

Fosam Company Approved w/


Limited
7-Mar-2017 Structural 1 Approval 14-Mar-2017 B comments

Issam Kabbani 19-Mar-2017 Structural 1 Approval 20-Mar-2017 A Approved


Issam Kabbani 20-Mar-2017 Structural 1 Approval 23-Mar-2017 E Rejected

Fosam Company Approved w/


Limited (FOSROC)
3-Apr-2017 Structural 1 Approval 4-Apr-2017 B comments

Issam Kabbani 20-Mar-2017 Structural 1 Approval 23-Mar-2017 A Approved

Fosam Company Approved w/


Limited
1-Apr-2017 Structural 1 Approval 5-Apr-2017 B comments

Approved w/
SIKA Company Ltd. 1-Apr-2017 Structural 1 Approval 5-Apr-2017 B comments

Approved w/
SIKA Company Ltd. 1-Apr-2017 Structural 1 Approval 5-Apr-2017 B comments

Fosam Company
Limited (FOSROC)
20-Apr-2017 Structural 1 Approval 26-Apr-2017 A Approved

Isam Kabbani and


partners
30-Jan-2017 Structural 1 Approval 31-Jan-2017 A Approved

Fosam Company Approved w/


Limited (FOSROC)
1-Feb-2017 Structural 1 Approval 6-Feb-2017 B comments

Brc Industrial Ltd. 30-Jan-2017 Structural 1 Approval 1-Feb-2017 A Approved

Salman Al Khaldi Approved w/


Trading EST.
7-Feb-2017 Structural 1 Approval 8-Feb-2017 B comments

Revise &
Rajhi Steel 27-Apr-2017 Structural 1 Approval 9-May-2017 C Resubmit

Approved w/
Rajhi Steel 15-Aug-2017 Structural 1 Approval 12-Sep-2017 B comments

HENKEL POLYBIT Approved w/


INDUSTRIES LTD.
30-Apr-2017 Structural 1 Approval 13-May-2017 B comments
HENKEL POLYBIT Approved w/
INDUSTRIES LTD.
30-Apr-2017 Structural 1 Approval 13-May-2017 B comments

HENKEL POLYBIT Approved w/


INDUSTRIES LTD.
30-Apr-2017 Structural 1 Approval 13-May-2017 B comments

Dermabit
Waterproofing 29-May-2017 Structural 1 Approval 3-Jun-2017 A Approved
Industries
Awazel-Arabian
Waterproofing 29-May-2017 Structural 1 Approval 3-Jun-2017 E Rejected
Industries Co.
WAMCO (Wadi
Approved w/
Maramer Trading 25-Jul-2017 Structural 1 Approval 27-Jul-2017 B comments
Group)
DCP (Don
Approved w/
Construction 27-Jul-2017 Structural 1 Approval 29-Jul-2017 B comments
Products)

Approved w/
Binex 30-Jul-2017 Structural 1 Approval 1-Aug-2017 B comments

Wamco 31-Jul-2017 Structural 1 Approval 3-Aug-2017 A Approved

Al - Bassami Group Approved w/


Co.
30-Aug-2017 Structural 1 Approval 12-Sep-2017 B comments

Al - Bassami Group
Co.
7-Nov-2017 Structural 1 Approval 9-Nov-2017 A Approved

Al - Tawi Ready Mix


Approved w/
Concrete & Cement 19-Sep-2017 Structural 1 Approval 24-Sep-2017 B comments
Products Co

Al - Tawi Ready Mix


Concrete & Cement 5-Oct-2017 Structural 1 Approval 9-Oct-2017 A Approved
Products Co

Fosam Company Approved w/


Limited (FOSROC)
29-Oct-2017 Structural 1 Approval 31-Oct-2017 B comments

Sodamco Weber Approved w/


(Saint Gobain)
16-Nov-2017 Structural 1 Approval 20-Nov-2017 B comments

Weber Sodamco Approved w/


(Saint Gobain)
16-Nov-2017 Structural 1 Approval 20-Nov-2017 B comments

Weber Sodamco Approved w/


(Saint Gobain)
23-Nov-2017 Structural 1 Approval 27-Nov-2017 B comments

Weber Sodamco Approved w/


(Saint Gobain)
23-Nov-2017 Structural 1 Approval 27-Nov-2017 B comments

Weber Sodamco Approved w/


(Saint Gobain)
26-Nov-2017 Structural 1 Approval 27-Nov-2017 B comments

Weber Sodamco Approved w/


(Saint Gobain)
26-Nov-2017 Structural 1 Approval 27-Nov-2017 B comments

Weber Sodamco Approved w/


(Saint Gobain)
26-Nov-2017 Structural 1 Approval 27-Nov-2017 B comments
Approved
Approved w/ Comments
Revise & Resubmit
Rejected

INTERNEL REFERENCE
NO REMARKS
COMMENTS

KHEP-MS-AR-0001-00 Closed

KHEP-MS-AR-0002-00 Closed

KHEP-MS-AR-0003-00 Closed

KHEP-MS-AR-0004-00 Closed

KHEP-MS-AR-0005-00 Closed

KHEP-MS-AR-0006-00 Closed

KHEP-MS-AR-0007-00 Closed

KHEP-MS-AR-0008-00 Closed

KHEP-MS-AR-0008-01 Closed

KHEP-MS-AR-0008-02 Closed
KHEP-MS-AR-0009-00 Closed

KHEP-MS-AR-0010-00 Closed

KHEP-MS-AR-0011-00 Closed

KHEP-MS-AR-0012-00 Closed

KHEP-MS-AR-0013-00 Closed

KHEP-MS-AR-0013-01 Closed

KHEP-MS-AR-0014-00 Closed

KHEP-MS-AR-0014-01 Closed

KHEP-MS-AR-0015-00 Closed

KHEP-MS-AR-0015-01 Closed

KHEP-MS-AR-0016-00 Closed

KHEP-MS-AR-0017-00 Closed
KHEP-MS-AR-0018-00 Closed

KHEP-MS-AR-0019-00 Closed

KHEP-MS-AR-0020-00 Closed

KHEP-MS-AR-0021-00 Closed

KHEP-MS-AR-0021-01 Closed

KHEP-MS-AR-0021-02 Closed

KHEP-MS-AR-0022-00 Closed
KHEP-MS-AR-0023-00 Closed

KHEP-MS-AR-0024-00 Closed

KHEP-MS-AR-0025-00 Closed

KHEP-MS-AR-0026-00 Closed

KHEP-MS-AR-0027-00 Closed

KHEP-MS-AR-0028-00 Closed

KHEP-MS-AR-0029-00 Closed

KHEP-MS-AR-0030-00 Closed

KHEP-MS-AR-0031-00 Closed

KHEP-MS-AR-0032-00 Closed

KHEP-MS-AR-0033-00 Closed

KHEP-MS-AR-0033-01 Closed

KHEP-MS-AR-0034-00 Closed
KHEP-MS-AR-0035-00 Closed

KHEP-MS-AR-0036-00 Closed

KHEP-MS-AR-0037-00 Closed

KHEP-MS-AR-0038-00 Closed

KHEP-MS-AR-0039-00 Closed

KHEP-MS-AR-0040-00 Closed

KHEP-MS-AR-0041-00 Closed

KHEP-MS-AR-0042-00 Closed

KHEP-MS-AR-0042-01 Closed

KHEP-MS-AR-0043-00 Closed

KHEP-MS-AR-0044-00 Closed

KHEP-MS-AR-0045-00 Closed

KHEP-MS-AR-0046-00 Closed

KHEP-MS-AR-0047-00 Closed
KHEP-MS-AR-0048-00 Closed

KHEP-MS-AR-0049-00 Closed

KHEP-MS-AR-0049-01 Closed

KHEP-MS-AR-0049-02 Closed

KHEP-MS-AR-0050-00 Closed

KHEP-MS-AR-0051-00 Closed

KHEP-MS-AR-0051-01 Closed

KHEP-MS-AR-0051-02 Closed

KHEP-MS-AR-0052-00 Closed

KHEP-MS-AR-0052-01 Closed

KHEP-MS-AR-0053-00 Closed

KHEP-MS-AR-0054-00 Closed

KHEP-MS-AR-0055-00 Closed

KHEP-MS-AR-0056-00 Closed

KHEP-MS-AR-0057-00 Closed

KHEP-MS-AR-0057-01 Closed
KHEP-MS-AR-0058-00 Closed

KHEP-MS-AR-0058-01 Closed

KHEP-MS-AR-0058-02 Closed

KHEP-MS-AR-0059-00 Closed

KHEP-MS-AR-0060-00 Closed

KHEP-MS-AR-0060-01 Closed

KHEP-MS-AR-0061-00 Closed

KHEP-MS-AR-0062-00 Closed

KHEP-MS-AR-0063-00 Closed

KHEP-MS-AR-0063-01 Closed

KHEP-MS-AR-0064-00 Closed
KHEP-MS-AR-0064-01 Closed

KHEP-MS-AR-0064-02 Closed

KHEP-MS-AR-0065-00 Closed

KHEP-MS-AR-0066-00 Closed

KHEP-MS-AR-0067-00 Closed

KHEP-MS-AR-0068-00 Closed

KHEP-MS-AR-0069-00 Closed

KHEP-MS-AR-0070-00 Closed

KHEP-MS-AR-0071-00 Closed

KHEP-MS-AR-0072-00 Closed

KHEP-MS-AR-0073-00 Closed
KHEP-MS-AR-0073-01 Closed

KHEP-MS-AR-0074-00 Closed

KHEP-MS-AR-0075-00 Closed

KHEP-MS-AR-0076-00 Closed

KHEP-MS-AR-0077-00 Closed

KHEP-MS-AR-0078-00 Closed

KHEP-MS-AR-0079-00 Closed

KHEP-MS-AR-0080-00 Closed

KHEP-MS-AR-0081-00 Closed

KHEP-MS-AR-0082-00 Closed

KHEP-MS-AR-0083-00 Closed

KHEP-MS-AR-0084-00 Closed

KHEP-MS-AR-0084-01 Closed

KHEP-MS-AR-0085-00 Closed
KHEP-MS-AR-0085-01 Closed

KHEP-MS-AR-0086-00 Closed

KHEP-MS-AR-0087-00 Closed

KHEP-MS-AR-0088-00 Closed

KHEP-MS-AR-0089-00 Closed

KHEP-MS-AR-0090-00 Closed

KHEP-MS-AR-0091-00 Closed

KHEP-MS-AR-0092-00 Closed

KHEP-MS-AR-0093-00 Closed
KHEP-MS-AR-0094-00 Closed

KHEP-MS-AR-0094-01 Closed

KHEP-MS-AR-0095-00 Closed

KHEP-MS-AR-0097-00 Closed

KHEP-MS-AR-0097-00 Closed

KHEP-MS-AR-0098-00 Closed
KHEP-MS-AR-0099-00 Closed

KHEP-MS-AR-0100-00
Closed
(KHEP-RFC-AR-0016-01)

KHEP-MS-AR-0101-00 Closed

KHEP-MS-AR-0102-00 Closed

KHEP-MS-AR-0103-00 Closed

KHEP-MS-AR-0104-00 Closed

KHEP-MS-AR-0105-00 Closed

KHEP-MS-AR-0106-00 Closed

KHEP-MS-AR-0107-00 Closed

KHEP-MS-AR-0107-01 Closed

KHEP-MS-AR-0108-00 Closed

KHEP-MS-AR-0108-01 Closed

KHEP-MS-AR-0109-00
KHEP-RFC-AR-0029-00 Closed
(Ref: Specd Section 05 5000)

KHEP-MS-AR-0110-00 Closed

KHEP-MS-AR-0110-01
Closed
SPECS SECTION 07 1300
KHEP-MS-AR-0111-00 Closed

KHEP-MS-AR-0112-00 Closed

KHEP-MS-AR-0113-00 Closed

KHEP-MS-AR-0114-00 Closed

KHEP-MS-AR-0115-00 Closed

KHEP-MS-AR-0116-00 Closed

KHEP-MS-AR-0117-00 Closed

KHEP-MS-AR-0118-00 Closed

KHEP-MS-AR-0119-00
Closed
SPECS Section 09 2300

KHEP-MS-AR-0120-00
Closed
SPECS Section 09 2400

KHEP-MS-AR-0121-00
SPECS Section 12 3600

KHEP-MS-AR-0122-00
Open
SPECS Section 10 2800

KHEP-MA-33-0007-00 Closed

KHEP-MS-CI-0002-00 Closed

KHEP-MS-CI-0003-00 Closed

KHEP-MS-CI-0003-01 Closed

KHEP-MS-CI-0003-02 Closed

KHEP-MS-CL-0001-00 Closed

KHEP-MS-CI-0005-00 Closed

KHEP-MS-CI-0005-01 Closed

KHEP-MS-CI-0005-02 Closed
KHEP-MA-33-0006-00 Closed

KHEP-MS-CI-0007-00 Closed

KHEP-MS-CI-0008-00 Closed

KHEP-MS-CI-0008-01 Closed

KHEP-MS-CI-0009-00 Closed

KHEP-MS-CI-0010-00 Closed

KHEP-MS-CI-0011-00 Closed

KHEP-MS-CI-0012-00 Closed

KHEP-MS-CI-0013-00 Closed

KHEP-MS-CI-0014-00 Closed

KHEP-MS-CI-0014-01 Closed

KHEP-MS-CI-0015-00 Closed

KHEP-MS-CI-0016-00 Closed

KHEP-MS-CI-0016-01 Closed

KHEP-MS-CI-0017-00 Closed

KHEP-MS-CI-0017-01 Closed

KHEP-MS-CI-0018-00 Closed

KHEP-MS-CI-0018-01 Closed

KHEP-MS-CI-0019-00 Closed

KHEP-MS-CI-0019-01 Closed

KHEP-MS-CI-0020-00 Closed

KHEP-MS-CI-0021-00 Closed

KHEP-MS-CI-0022-00 Closed

KHEP-MS-CI-0023-00 Closed

KHEP-MS-CI-0024-00 Closed

KHEP-MS-CI-0025-00 Closed

KHEP-MS-CI-0026-00 Closed
KHEP-MS-CI-0026-01 Closed

KHEP-MS-CI-0027-00 Closed

KHEP-MS-CI-0027-01 Closed

KHEP-MS-CI-0028-00 Closed

KHEP-MS-CI-0029-00 Closed

KHEP-MS-CI-0030-00 Closed

KHEP-MS-CI-0030-01 Closed

KHEP-MS-CI-0031-00 Closed

KHEP-MS-CI-0031-01 Closed

KHEP-MS-CI-0032-00 Closed

KHEP-MS-CI-0032-01 Closed

KHEP-MS-CI-0033-00 Closed

KHEP-MS-CI-0034-00 Closed

KHEP-MS-CI-0035-00 Closed

KHEP-MS-CI-0036-00 Closed

KHEP-MS-CI-0036-01 Closed

KHEP-MS-CI-0037-00 Closed

KHEP-MS-CI-0037-01 Closed

KHEP-MS-CI-0038-00 Closed

KHEP-MS-CI-0039-00 Closed

KHEP-MS-CI-0040-00 Closed

KHEP-MS-CI-0041-00 Closed

KHEP-MS-CI-0042-00 Closed

KHEP-MS-CI-0043-00 Closed

KHEP-MS-CI-0044-00 Closed

KHEP-MS-CI-0045-00 Closed
KHEP-MS-CI-0046-00 Closed

KHEP-MS-CI-0047-00 Closed

KHEP-MS-CI-0048-00 Closed

KHEP-MS-CI-0049-00 Closed

KHEP-MS-CI-0050-00 Closed

KHEP-MS-CI-0050-01 Closed

KHEP-MS-CI-0050-02 Closed

KHEP-MS-CI-0050-03 Closed

KHEP-MS-CI-0051-00 Closed

KHEP-MS-CI-0051-01 Closed

KHEP-MS-CI-0052-00 Closed

KHEP-MS-CI-0052-01 Closed

KHEP-MS-CI-0053-00 Closed

KHEP-MS-CI-0054-00 Closed

KHEP-MS-CI-0055-00 Closed

KHEP-MS-CI-0056-00 Closed

KHEP-MA-26-0001-00 Closed

KHEP-MA-26-0001-00 Closed

KHEP-MS-EL-0001-02 Closed

KHEP-MS-EL-0001-03 Closed

KHEP-MA-26-0002-00 Closed
KHEP-MA-26-0003-00 Closed

KHEP-MA-26-0004-00 Closed

KHEP-MA-26-0005-00 Closed

KHEP-MA-27-0002-00 Closed

KHEP-MS-EL-0006-00 Closed

KHEP-MS-EL-0007-00 Closed

KHEP-MS-EL-0008-00 Closed

KHEP-MS-EL-0009-00 Closed

KHEP-MS-EL-0009-01 Closed

KHEP-MS-EL-0009-02 Closed

KHEP-MS-EL-0010-00 Closed

KHEP-MS-EL-0011-00 Closed

KHEP-MS-EL-0012-00 Closed

KHEP-MS-EL-0012-01 Closed

KHEP-MS-EL-0013-00 Closed

KHEP-MS-EL-0013-01 Closed

KHEP-MS-EL-0014-00 Closed

KHEP-MS-EL-0014-01 Closed
KHEP-MS-EL-0015-00 Closed

KHEP-MS-EL-0016-00 Closed

KHEP-MS-EL-0016-01 Closed

KHEP-MS-EL-0017-00 Closed

KHEP-MS-EL-0017-01 Closed

KHEP-MS-EL-0018-00 Closed

KHEP-MS-EL-0018-01 Closed

KHEP-MS-EL-0018-02 Closed

KHEP-MS-EL-0019-00 Closed

KHEP-MS-EL-0020-00 Closed

KHEP-MS-EL-0020-01 Closed

KHEP-MS-EL-0020-02 Closed

KHEP-MS-EL-0020-03 Closed

KHEP-MS-EL-0020-04
Related Doc: Closed
KHEP-OT-0109-00
KHEP-MS-EL-0021-00 Closed

KHEP-MS-EL-0022-00 Closed

KHEP-MS-EL-0023-00 Closed

KHEP-MS-EL-0024-00 Closed

KHEP-MS-EL-0025-00 Closed

KHEP-MS-EL-0026-00 Closed

KHEP-MS-EL-0026-01 Closed

KHEP-MS-EL-0026-02 Closed

KHEP-MS-EL-0026-03 Closed
KHEP-MS-EL-0026-04 Closed

KHEP-MS-EL-0027-00 Closed

KHEP-MS-EL-0027-01 Closed

KHEP-MS-EL-0028-00 Closed

KHEP-MS-EL-0029-00 Closed

KHEP-MS-EL-0029-01 Closed

KHEP-MS-EL-0029-02 Closed

KHEP-MS-EL-0029-03 Closed

KHEP-MS-EL-0029-04 Closed

KHEP-MS-EL-0030-00 Closed

KHEP-MS-EL-0031-00 Closed

KHEP-MS-EL-0031-01 Closed

KHEP-MS-EL-0032-00 Closed

KHEP-MS-EL-0032-01 Closed

KHEP-MS-EL-0032-02 Closed

KHEP-MS-EL-0033-00 Closed

KHEP-MS-EL-0034-00 Closed

KHEP-MS-EL-0034-01 Closed

KHEP-MS-EL-0035-00 Closed

KHEP-MS-EL-0035-01 Closed

KHEP-MS-EL-0036-00 Closed

KHEP-MS-EL-0037-00 Closed

KHEP-MS-EL-0037-01 Closed

KHEP-MS-EL-0037-02 Closed

KHEP-MS-EL-0037-03 Closed
KHEP-MS-EL-0038-00 Closed

KHEP-MS-EL-0038-01 Closed

KHEP-MS-EL-0038-02 Closed

KHEP-MS-EL-0039-00 Closed

KHEP-MS-EL-0040-00 Closed

KHEP-MS-EL-0041-00 Closed

KHEP-MS-EL-0042-00 Closed

KHEP-MS-EL-0043-00 Closed

KHEP-MS-EL-0044-00 Closed

KHEP-MS-EL-0044-01 Closed

KHEP-MS-EL-0045-00 Closed

KHEP-MS-EL-0045-01 Closed

KHEP-MS-EL-0046-00 Closed

KHEP-MS-EL-0046-01 Closed

KHEP-MS-EL-0046-02 Closed

KHEP-MS-EL-0046-03 Closed

KHEP-MS-EL-0047-00 Closed
KHEP-MS-EL-0048-00 Closed

KHEP-MS-EL-0049-00 Closed

KHEP-MS-EL-0050-00 Closed

KHEP-MS-EL-0051-00 Closed

KHEP-MS-EL-0052-00
Closed
(KHEP-OT-0082-00)
KHEP-MS-EL-0053-00
Closed
(KHEP-OT-0046-00)

KHEP-RFC-EL-0024-00
Closed
(KHEP-OT-0046-00)

KHEP-MS-EL-0054-00
Closed
(KHEP-OT-0046-00)

KHEP-MS-EL-0054-01
Closed
(KHEP-OT-0046-00)

KHEP-MS-EL-0055-00
(KHEP-OT-0040-01 and
Closed
KHEP-RFC-EL-0031-00 and
KHEP-RFC-EL-0031-01)

KHEP-MS-EL-0055-01 Closed

KHEP-MS-EL-0056-00
(KHEP-OT-0054-00 and Closed
KHEP-OT-0085-00 )

KHEP-MS-EL-0057-00 Closed

KHEP-MS-EL-0058-00 Closed

KHEP-MS-EL-0059-00 Closed

KHEP-MS-EL-0060-00 Closed

KHEP-MS-EL-0061-00
Related Document: KHEP- Closed
MS-EL-0020-00
KHEP-MS-EL-0062-00
Related Document: KHEP- Closed
RFC-EL-0031-00
KHEP-MS-EL-0063-00
Related Document: KHEP- Closed
OT-EL-0104-00

KHEP-MS-EL-0064-00 Closed

KHEP-MS-EL-0065-00 Closed

KHEP-MS-EL-0065-01 Closed

KHEP-MA-27-0001-00 Closed
KHEP-MS-LC-0001-00 Closed

KHEP-MS-LC-0002-00 Closed

KHEP-MS-LC-0002-01 Closed

KHEP-MS-LC-0002-02 Closed

KHEP-MS-LC-0003-00 Closed

KHEP-MS-LC-0003-01 Closed

KHEP-MS-LC-0003-02 Closed

KHEP-MS-LC-0003-03 Closed

KHEP-MS-LC-0004-00 Closed

KHEP-MS-LC-0005-00 Closed

KHEP-MS-LC-0005-01 Closed

KHEP-MS-LC-0006 Closed

KHEP-MS-LC-0007 Closed

KHEP-MS-LC-0007-01 Closed

KHEP-MS-LC-0008-00 Closed

KHEP-MS-HVAC-0001-00 Closed

KHEP-MS-HVAC-0002-00 Closed

KHEP-MS-HVAC-0003-00 Closed

KHEP-MS-HVAC-0003-01 Closed

KHEP-MS-HVAC-0003-02 Closed

KHEP-MS-HVAC-0004-00 Closed
KHEP-MS-HVAC-0005-00 Closed

KHEP-MS-HVAC-0006-00 Closed

KHEP-MS-HVAC-0007-00 Closed

KHEP-MS-HVAC-0008-00 Closed

KHEP-MS-HVAC-0008-01 Closed

KHEP-MS-HVAC-0008-02 Closed

KHEP-MS-HVAC-0008-03
REF: KHEP-MS-HVAC-0008- Closed
02

KHEP-MS-HVAC-0009-00 Closed

KHEP-MS-HVAC-0009-01 Closed

KHEP-MS-HVAC-0009-02 Closed

KHEP-MS-HVAC-0010-00 Closed

KHEP-MS-HVAC-0010-01 Closed

KHEP-MS-HVAC-0011-00 Closed

KHEP-MS-HVAC-0011-01
Refer to: KHEP-OT-0099-00 Closed
(calculation)
KHEP-MS-HVAC-0012-00 Closed

KHEP-MS-HVAC-0012-01 Closed

KHEP-MS-HVAC-0013-00 Closed

KHEP-MS-HVAC-0014-00 Closed

KHEP-MS-HVAC-0015-00 Closed

KHEP-MS-HVAC-0016-00 Closed

KHEP-MS-HVAC-0016-01 Closed

KHEP-MS-HVAC-0017-00 Closed

KHEP-MS-HVAC-0018-00
Refer to KHEP-OT-0099-00 Closed
(Calculation)
KHEP-MS-HVAC-0018-00
Refer to KHEP-OT-0099-00 Closed
(Calculation)
KHEP-MS-HVAC-0018-00
Refer to KHEP-OT-0099-00 Closed
(Calculation)

KHEP-MS-HVAC-0019-00 Closed

KHEP-MS-HVAC-0019-01 Closed

KHEP-MS-HVAC-0019-02 Closed
KHEP-MS-HVAC-0020-00 Closed

KHEP-MS-HVAC-0021-00 Closed

KHEP-MS-HVAC-0021-01 Closed

KHEP-MS-ME-0001-00 Closed

KHEP-MS-ME-0001-01 Closed

KHEP-MS-ME-0002-00 Closed

KHEP-MS-ME-0003-00 Closed

KHEP-MS-ME-0003-01 Closed

KHEP-MS-ME-0004-00 Closed

KHEP-MS-ME-0005-00 Closed

KHEP-MS-ME-0006-00 Closed

KHEP-MS-ME-0007-00 Closed

KHEP-MS-ME-0007-01 Closed

KHEP-MS-ME-0008-00 Closed

KHEP-MS-ME-0009-00 Closed

KHEP-MS-ME-0010-00 Closed

KHEP-MS-ME-0011-00 Closed

KHEP-MS-ME-0012-00 Closed

KHEP-MS-ME-0012-01 Open

KHEP-MS-PL-0001-00 Closed

KHEP-MS-PL-0001-01 Closed

KHEP-MS-PL-0001-02 Closed

KHEP-MS-PL-0002-00 Closed

KHEP-MS-PL-0002-01 Closed
KHEP-MS-PL-0003-00 Closed

KHEP-MS-PL-0004-00 Closed

KHEP-MS-PL-0005-00 Closed

KHEP-MS-PL-0005-01 Closed

KHEP-MS-PL-0006-00 Closed

KHEP-MS-PL-0007-00 Closed

KHEP-MS-PL-0007-01 Closed

KHEP-MS-PL-0008-00 Closed

KHEP-MS-PL-0009-00 Closed

KHEP-MS-PL-0010-00 Closed

KHEP-MS-PL-0011-00 Closed

KHEP-MS-PL-0012-00 Closed

KHEP-MS-PL-0012-01 Closed

KHEP-MS-PL-0013-00 Closed

KHEP-MS-PL-0014-00 Closed

KHEP-MS-PL-0015-00 Closed

KHEP-MS-PL-0016-00 Closed

KHEP-MS-PL-0016-01 Closed

KHEP-MS-PL-0016-02 Closed

KHEP-MS-PL-0016-03 Closed

KHEP-MS-PL-0017-00 Closed

KHEP-MS-PL-0017-01 Closed

KHEP-MS-PL-0017-02 Closed

KHEP-MS-PL-0018-00 Closed

KHEP-MS-PL-0019-00 Closed

KHEP-MS-PL-0019-01 Closed

KHEP-MS-PL-0020-00 Closed

KHEP-MS-PL-0020-01 Closed
KHEP-MS-PL-0021-00 Closed

KHEP-MS-PL-0022-00 Closed

KHEP-MS-PL-0023-00 Closed

KHEP-MS-PL-0024-00 Closed

KHEP-MS-PL-0024-01 Closed

KHEP-MS-PL-0025-00 Closed

KHEP-MS-PL-0026-00 Closed

KHEP-MS-PL-0027-00 Closed

KHEP-MS-PL-0028-00 Closed

KHEP-MS-PL-0029-00 Closed

KHEP-MS-PL-0030-00 Closed

KHEP-MS-PL-0031-00 Closed

KHEP-MS-PL-0032-00 Closed

KHEP-MS-PL-0033-00 Closed

KHEP-MS-PL-0034-00 Closed

KHEP-MS-PL-0035-00 Closed

KHEP-MS-PL-0035-01 Closed

KHEP-MS-PL-0036-00 Closed

KHEP-MS-PL-0037-00 Closed

KHEP-MA-03-0001 Closed

KHEP-MS-ST-0001-01 Closed

KHEP-MA-03-0002 Closed

KHEP-MS-ST-0002-01 Closed

KHEP-MA-07-0004 Closed
KHEP-MA-03-0003 Closed

KHEP-MA-03-0004 Closed

KHEP-MA-07-0001 Closed

KHEP-MA-31-0001 Closed

KHEP-MA-03-0005 Closed

KHEP-MS-ST-0006-00 Closed

KHEP-MS-ST-0007-00 Closed

KHEP-MS-ST-0008-00 Closed

KHEP-MS-ST-0009-00 Closed

KHEP-MS-ST-0009-01 Closed

KHEP-MS-ST-0010-00 Closed

KHEP-MS-ST-0011-00 Closed
KHEP-MS-ST-0012-00 Closed

KHEP-MS-ST-0012-01 Closed

KHEP-MS-ST-0013-00 Closed

KHEP-MS-ST-0014-00 Closed

KHEP-MS-ST-0015-00 Closed

KHEP-MS-ST-0016-00 Closed

KHEP-MS-ST-0017-00 Closed

KHEP-MS-ST-0018-00 Closed

KHEP-MS-ST-0019-00 Closed

KHEP-MS-ST-0020-00 Closed

KHEP-MS-ST-0021-00 Closed

KHEP-MS-ST-0022-00 Closed

KHEP-MS-ST-0022-01 Closed

KHEP-MS-ST-0023-00 Closed
KHEP-MS-ST-0024-00 Closed

KHEP-MS-ST-0025-00 Closed

KHEP-MS-ST-0026-00 Closed

KHEP-MS-ST-0027-00 Closed

KHEP-MS-ST-0028-00 Closed

KHEP-MS-ST-0029-00 Closed

KHEP-MS-ST-0030-00 Closed

KHEP-MS-ST-0031-00 Closed

KHEP-MS-ST-0032-00 Closed

KHEP-MS-ST-0032-01 Closed

KHEP-MS-ST-0033-00 Closed

KHEP-MS-ST-0033-01 Closed

Closed

KHEP-MS-ST-0035-00 Closed

KHEP-MS-ST-0036-00 Closed

KHEP-MS-ST-0037-00 Closed

KHEP-MS-ST-0038-00 Closed

KHEP-MS-ST-0039-00 Closed

KHEP-MS-ST-0040-00 Closed

KHEP-MS-ST-0041-00 Closed
SR NO SHOP DRAWING NO. ACTIVITIES / INSPECTION ITEMS SUBMITTED DATE

ARCHITECTURAL
0001 KHEP-SD-AR-0001-00 B2 Ground Floor Plan; First Floor Plan & Roof Plan 28-Mar-2017

0001.1 KHEP-SD-AR-0001-01 B2 Ground Floor Plan, First Floor Plan & Roof Plan 9-May-2017

0001.2 KHEP-SD-AR-0001-02 B2 Ground Floor Plane, First Floor Plan & Roof Plan 1-Jun-2017

0001.3 KHEP-SD-AR-0001-03 B2 Ground Floor Plane, First Floor Plan & Roof Plan 3-Jul-2017

0001.4 KHEP-SD-AR-0001-04 B2 Ground Floor Plane, First Floor Plan & Roof Plan 18-Jul-2017

0001.5 KHEP-SD-AR-0001-05 B2 Ground Floor Plane & First Floor Plan 18-Dec-2017

0001.6 KHEP-SD-AR-0001-06 B2 Ground Floor Plane & First Floor Plan 28-Feb-2018

0002 KHEP-SD-AR-0002-00 B2 Front & Side Elevations; Rear & Side Elevations 28-Mar-2017

0002.1 KHEP-SD-AR-0002-01 B2 Front & Side Elevations; Rear & Side Elevations 9-May-2017

0002.2 KHEP-SD-AR-0002-02 B2 Front & Side Elevations; Rear & Side Elevations 3-Jul-2017

0002.3 KHEP-SD-AR-0002-03 B2 Front & Side Elevations, Rear & Side Elevations 18-Jul-2017

0002.4 KHEP-SD-AR-0002-04 B2 Front & Side Elevations, Rear & Side Elevations 28-Feb-2018

0003 KHEP-SD-AR-0003-00 B2 Section 1 & 2; Wall Section Details 28-Mar-2017

0003.1 KHEP-SD-AR-0003-01 B2 Section 1 & 2; Wall Section Details 9-May-2017

0003.2 KHEP-SD-AR-0003-02 B2 Section 1 & 2, Wall Section Details 19-Jul-2017

0003.3 KHEP-SD-AR-0003-03 B2 Section 1 & 2, Wall Section Details 5-Aug-2017

0004 KHEP-SD-AR-0004-00 B2 Kitchen Area Details; Wet Area Details; Stair Details 28-Mar-2017

0004.1 KHEP-SD-AR-0004-01 B2 Kitchen Area Details; Wet Area Details; Stair Details 9-May-2017

0004.2 KHEP-SD-AR-0004-02 B2 Kitchen Area Details 6-Aug-2017

0005 KHEP-SD-AR-0005-00 B2 Finishing Floor Plan 28-Mar-2017

0005.1 KHEP-SD-AR-0005-01 B2 Finishing Floor Plan 9-May-2017

0005.2 KHEP-SD-AR-0005-02 B2 Finishing Floor Plan 13-Nov-2017


B2 Ground Floor Reflected Ceiling Plan; First Floor Reflected Ceiling
0006 KHEP-SD-AR-0006-00 28-Mar-2017
Plan
B2 Ground Floor Reflected Ceiling Plan; First Floor Reflected Ceiling
0006.1 KHEP-SD-AR-0006-01 9-May-2017
Plan

0006.2 KHEP-SD-AR-0006-02 B2 Ground Floor & First Floor Reflected Ceiling Plan 1-Aug-2017

0006.3 KHEP-SD-AR-0006-03 B2 Ground Floor & First Floor Reflected Ceiling Plan 4-Jan-2018

0007 KHEP-SD-AR-0007-00 B2 Ground Floor Furniture Layout; First Floor Furniture Layout 28-Mar-2017

0007.1 KHEP-SD-AR-0007-01 B2 Ground Floor Furniture Layout; First Floor Furniture Layout 9-May-2017

0008 KHEP-SD-AR-0008-00 B2 Wall Finishing Layout 28-Mar-2017

0008.1 KHEP-SD-AR-0008-01 B2 Wall Finishing Plan 9-May-2017

0008.2 KHEP-SD-AR-0008-02 B2 Wall Finishing Plan 3-Aug-2017

0009 KHEP-SD-AR-0009-00 B2 Safety Plan 28-Mar-2017

0009.1 KHEP-SD-AR-0009-01 B2 Safety Plan 9-May-2017

0009.2 KHEP-SD-AR-0009-02 B2 Safety Plan 31-Jul-2017

0009.3 KHEP-SD-AR-0009-03 B2 Safety Plan 10-Oct-2017

0010 KHEP-SD-AR-0010-00 A6 Ground Floor Plan, First Floor Plan & Roof Plan 29-Mar-2017

0010.1 KHEP-SD-AR-0010-01 A6 Ground Floor Plan, First Floor Plan & Roof Plan 14-May-2017

0010.2 KHEP-SD-AR-0010-02 A6 Ground Floor Plan, First Floor Plan & Roof Plan 8-Jul-2017

0010.3 KHEP-SD-AR-0010-03 A6 Ground Floor Plan, First Floor Plan & Roof Plan 18-Jul-2017

0010.4 KHEP-SD-AR-0010-04 A6 Ground Floor Plan & First Floor Plan 18-Dec-2017

0011 KHEP-SD-AR-0011-00 A6 Front & Side Elevations; Rear & Side Elevations 29-Mar-2017

0011.1 KHEP-SD-AR-0011-01 A6 Front & Side Elevations; Rear & Side Elevations 14-May-2017

0011.2 KHEP-SD-AR-0011-02 A6 Front & Rear Elevations & Side Elevations 4-Jul-2017

0011.3 KHEP-SD-AR-0011-03 A6 Front & Rear Elevations & Side Elevations 18-Jul-2017

0012 KHEP-SD-AR-0012-00 A6 Section 1 & 2; Wall Section Details 29-Mar-2017

0012.1 KHEP-SD-AR-0012-01 A6 Section 1 & 2; Wall Section Details 14-May-2017

0012.2 KHEP-SD-AR-0012-02 A6 Section 1 & 2, Wall Section Details 26-Jul-2017

0012.3 KHEP-SD-AR-0012-03 A6 Section 1 & 2, Wall Section Details 5-Aug-2017

0013 KHEP-SD-AR-0013-00 A6 Stair Details 29-Mar-2017

0013.1 KHEP-SD-AR-0013-01 A6 Stair Details 14-May-2017

0013.2 KHEP-SD-AR-0013-02 A6 Stair Details 5-Aug-2017

0013.3 KHEP-SD-AR-0013-03 A6 Stair Details 9-Oct-2017


0014 KHEP-SD-AR-0014-00 A6 Kitchen Details 29-Mar-2017

0014.1 KHEP-SD-AR-0014-01 A6 Kitchen Details 14-May-2017

0015 KHEP-SD-AR-0015-00 A6 Ground Floor Flooring Plan; First Floor Flooring Plan 29-Mar-2017

0015.1 KHEP-SD-AR-0015-01 A6 Ground Floor & First Floor Flooring Plan 14-May-2017

0015.2 KHEP-SD-AR-0015-02 A6 Ground Floor & First Floor Flooring Plan 2-Dec-2017

0016 KHEP-SD-AR-0016-00 A6 Ground Floor Wall Finish Plan, First Floor Finish Plan 29-Mar-2017

0016.1 KHEP-SD-AR-0016-01 A6 Ground Floor Wall Finish Plan, First Floor Finish Plan 14-May-2017

0016.2 KHEP-SD-AR-0016-02 A6 Ground Floor Wall Finish Plan, First Floor Finish Plan 3-Aug-2017

A6 Ground Floor Reflected Ceiling Plan; First Floor Reflected Ceiling


0017 KHEP-SD-AR-0017-00 29-Mar-2017
Plan
A6 Ground Floor Reflected Ceiling Plan; First Floor Reflected Ceiling
0017.1 KHEP-SD-AR-0017-01 14-May-2017
Plan

0017.2 KHEP-SD-AR-0017-02 A6 Ground Floor & First Floor Reflected Ceiling Plan 1-Aug-2017

0018 KHEP-SD-AR-0018-00 A6 Wet Area Details 29-Mar-2017

0018.1 KHEP-SD-AR-0018-01 A6 Wet Area Details 14-May-2017

0018.2 KHEP-SD-AR-0018-02 A6 Wet Area Details 5-Dec-2017

0019 KHEP-SD-AR-0019-00 A6 Furniture Layout-Ground Floor & First Floor 29-Mar-2017

0019.1 KHEP-SD-AR-0019-01 A6 Furniture Layout-Ground Floor & First Floor 14-May-2017

0020 KHEP-SD-AR-0020-00 A6 Life Safety Plan 29-Mar-2017

0020.1 KHEP-SD-AR-0020-01 A6 Life Safety Plan 14-May-2017

0020.2 KHEP-SD-AR-0020-02 A6 Life Safety Plan 31-Jul-2017

0020.3 KHEP-SD-AR-0020-03 A6 Life Safety Plan 18-Nov-2017

BC4 GROUND FLOOR PLAN,FIRST FLOOR PLAN & ROOF PLAN


0021 KHEP-SD-AR-0021-00 8-May-2017

BC4 GROUND FLOOR PLAN,FIRST FLOOR PLAN & ROOF PLAN


0021.1 KHEP-SD-AR-0021-01 1-Jun-2017

BC4 GROUND FLOOR PLAN,FIRST FLOOR PLAN & ROOF PLAN


0021.2 KHEP-SD-AR-0021-02 8-Jul-2017

BC4 GROUND FLOOR PLAN,FIRST FLOOR PLAN & ROOF PLAN


0021.3 KHEP-SD-AR-0021-03 18-Jul-2017
BC4 FRONT & REAR ELEVATIONS,SIDE ELEVATIONS
0022 KHEP-SD-AR-0022-00 8-May-2017

BC4 FRONT & REAR ELEVATIONS,SIDE ELEVATIONS


0022.1 KHEP-SD-AR-0022-01 4-Jul-2017

BC4 FRONT & REAR ELEVATIONS,SIDE ELEVATIONS


0022.2 KHEP-SD-AR-0022-02 18-Jul-2017

BC4 SECTION 1 & 2,WALL SECTION DETAILS


0023 KHEP-SD-AR-0023-00 8-May-2017

BC4 SECTION 1 & 2,WALL SECTION DETAILS


0023.1 KHEP-SD-AR-0023-01 26-Jul-2017

BC4 SECTION 1 & 2,WALL SECTION DETAILS


0023.2 KHEP-SD-AR-0023-02 5-Aug-2017

0024 KHEP-SD-AR-0024-00 BC4 STAIR DETAILS 8-May-2017

0024.1 KHEP-SD-AR-0024-01 BC4 STAIR DETAILS 5-Aug-2017

0025 KHEP-SD-AR-0025-00 BC4 KITCHEN AREA DETAILS 8-May-2017

0026 KHEP-SD-AR-0026-00 BC4 GROUND FLOOR & FIRST FLOOR FLOORING PLAN 8-May-2017

0026.1 KHEP-SD-AR-0026-01 BC4 GROUND FLOOR & FIRST FLOOR FLOORING PLAN 27-Dec-2017

BC4 GROUND FLOOR & FIRST FLOOR WALL FINISHING PLAN


0027 KHEP-SD-AR-0027-00 8-May-2017

BC4 GROUND FLOOR & FIRST FLOOR WALL FINISHING PLAN


0027.1 KHEP-SD-AR-0027-01 3-Aug-2017

BC4 GROUND FLOOR & FIRST FLOOR REFLECTED CEILING PLAN


0028 KHEP-SD-AR-0028-00 8-May-2017

BC4 GROUND FLOOR & FIRST FLOOR REFLECTED CEILING PLAN


0028.1 KHEP-SD-AR-0028-01 1-Aug-2017

0029 KHEP-SD-AR-0029-00 BC4 WET AREA DETAILS 8-May-2017

0029.1 KHEP-SD-AR-0029-01 BC4 WET AREA DETAILS 18-Jan-2018

BC4 GROUND FLOOR & FIRST FLOOR FURNITURE LAYOUT


0030 KHEP-SD-AR-0030-00 8-May-2017

BC4 GROUND FLOOR & FIRST FLOOR LIFE SAFETY PLAN


0031 KHEP-SD-AR-0031-00 8-May-2017

BC4 GROUND FLOOR & FIRST FLOOR LIFE SAFETY PLAN


0031.1 KHEP-SD-AR-0031-01 31-Jul-2017

BC4 GROUND FLOOR & FIRST FLOOR LIFE SAFETY PLAN


0031.2 KHEP-SD-AR-0031-02 29-Nov-2017

BC4 DOOR SCHEDULE, WINDOW SCHEDULE


0032 KHEP-SD-AR-0032-00 9-May-2017

B2 DOOR SCHEDULE, WINDOW SCHEDULE


0033 KHEP-SD-AR-0033-00 9-May-2017

0034 KHEP-SD-AR-0034-00 BC6 GROUND FLOOR,FIRST FLOOR & ROOF PLAN 9-May-2017
0034.1 KHEP-SD-AR-0034-01 BC6 GROUND FLOOR,FIRST FLOOR & ROOF PLAN 8-Jul-2017

0034.2 KHEP-SD-AR-0034-02 BC6 GROUND FLOOR, FIRST FLOOR & ROOF PLAN 18-Jul-2017

BC6 FRONT, REAR & SIDE ELEVATIONS


0035 KHEP-SD-AR-0035-00 9-May-2017

BC6 FRONT, REAR ELEVATIONS & SIDE ELEVATIONS


0035.1 KHEP-SD-AR-0035-01 4-Jul-2017

BC6 FRONT, REAR ELEVATIONS & SIDE ELEVATIONS


0035.2 KHEP-SD-AR-0035-02 18-Jul-2017

BC6 SECTION 1 & 2; WALL SECTION DETAILS


0036 KHEP-SD-AR-0036-00 9-May-2017

BC6 SECTION 1 & 2, WALL SECTION DETAILS


0036.1 KHEP-SD-AR-0036-01 26-Jul-2017

BC6 SECTION 1 & 2, WALL SECTION DETAILS


0036.2 KHEP-SD-AR-0036-02 5-Aug-2017

0037 KHEP-SD-AR-0037-00 BC6 STAIR DETAILS 9-May-2017

0037.1 KHEP-SD-AR-0037-01 BC6 STAIR DETAILS 5-Aug-2017

0038 KHEP-SD-AR-0038-00 BC6 KITCHEN AREA DETAILS 9-May-2017

0038.1 KHEP-SD-AR-0038-01 BC6 KITCHEN AREA DETAILS 1-Aug-2017

0039 KHEP-SD-AR-0039-00 BC6 GROUND FLOOR & FIRST FLOOR FLOORING PLAN 9-May-2017

0039.1 KHEP-SD-AR-0039-01 BC6 GROUND FLOOR & FIRST FLOOR FINISHING FLOORING PLAN 31-Jan-2018

0039.2 KHEP-SD-AR-0039-02 BC6 GROUND FLOOR & FIRST FLOOR FINISHING FLOORING PLAN 27-Feb-2018

BC6 GROUND FLOOR & FIRST FLOOR WALL FINISHING PLAN


0040 KHEP-SD-AR-0040-00 9-May-2017

BC6 GROUND FLOOR & FIRST FLOOR WALL FINISHING PLAN


0040.1 KHEP-SD-AR-0040-01 3-Aug-2017

BC6 GROUND FLOOR & FIRST FLOOR REFLECTED CEILING PLAN


0041 KHEP-SD-AR-0041-00 9-May-2017

BC6 GROUND FLOOR & FIRST FLOOR REFLECTED CEILING PLAN


0041.1 KHEP-SD-AR-0041-01 1-Aug-2017

0042 KHEP-SD-AR-0042-00 BC6 WET AREA DETAILS 9-May-2017

0042.1 KHEP-SD-AR-0042-01 BC6 WET AREA DETAILS 18-Jan-2018

BC6 GROUND FLOOR & FIRST FLOOR FURNITURE LAYOUT


0043 KHEP-SD-AR-0043-00 9-May-2017

BC6 GROUND FLOOR & FIRST FLOOR LIFE SAFETY PLAN


0044 KHEP-SD-AR-0044-00 9-May-2017

BC6 GROUND FLOOR & FIRST FLOOR LIFE SAFETY PLAN


0044.1 KHEP-SD-AR-0044-01 31-Jul-2017

BC6 GROUND FLOOR & FIRST FLOOR LIFE SAFETY PLAN


0044.2 KHEP-SD-AR-0044-02 29-Nov-2017
BC6 DOOR SCHEDULE; WINDOW SCHEDULE
0045 KHEP-SD-AR-0045-00 9-May-2017

A4 GROUND FLOOR PLANA4 FIRST FLOOR PLAN


0046 KHEP-SD-AR-0046-00 11-May-2017
A4 ROOF PLAN

0046.1 KHEP-SD-AR-0046-01 A4 GROUND FLOOR, FIRST FLOOR & ROOF FLOOR PLAN 1-Jun-2017

0046.2 KHEP-SD-AR-0046-02 A4 GROUND FLOOR, FIRST FLOOR & ROOF FLOOR PLAN 4-Jul-2017

0046.3 KHEP-SD-AR-0046-03 A4 GROUND FLOOR, FIRST FLOOR & ROOF FLOOR PLAN 16-Jul-2017

0047 KHEP-SD-AR-0047-00 A4 FRONT & REAR ELEVATIONS A4 SIDE ELEVATIONS 11-May-2017

0047.1 KHEP-SD-AR-0047-01 A4 FRONT & REAR ELEVATIONS, SIDE ELEVATIONS 4-Jul-2017

0047.2 KHEP-SD-AR-0047-02 A4 FRONT & REAR ELEVATIONS, SIDE ELEVATIONS 16-Jul-2017

A4 SECTION 1 & 2 A4 WALL SECTION DETAILS


0048 KHEP-SD-AR-0048-00 11-May-2017

0048.1 KHEP-SD-AR-0048-01 A4 SECTION 1 & 2 A4 WALL SECTION DETAILS 26-Jul-2017

0048.2 KHEP-SD-AR-0048-02 A4 SECTION 1 & 2 A4 WALL SECTION DETAILS 5-Aug-2017

0049 KHEP-SD-AR-0049-00 A4 STAIR DETAILS 11-May-2017

0049.1 KHEP-SD-AR-0049-01 A4 STAIR DETAILS 5-Aug-2017

0050 KHEP-SD-AR-0050-00 A4 KITCHEN AREA DETAILS 11-May-2017

0050.1 KHEP-SD-AR-0050-01 A4 KITCHEN AREA DETAILS 1-Aug-2017

A4 GROUND FLOOR FLOORING PLANA 4 FIRST FLOOR FLOORING


0051 KHEP-SD-AR-0051-00 11-May-2017
PLAN
A4 GROUND FLOOR WALL FINISHING PLAN A4 FIRST FLOOR WALL
0052 KHEP-SD-AR-0052-00 11-May-2017
FINISHING PLAN

0052.1 KHEP-SD-AR-0052-01 A4 GROUND FLOOR & FIRST FLOOR WALL FINISHING PLAN 3-Aug-2017

A4 GROUND FLOOR REFLECTED CEILING PLAN A4 FIRST FLOOR


0053 KHEP-SD-AR-0053-00 11-May-2017
REFLECTED CEILING PLAN

A4 GROUND FLOOR & FIRST FLOOR REFLECTED CEILING PLAN


0053.1 KHEP-SD-AR-0053-01 1-Aug-2017

0054 KHEP-SD-AR-0054-00 A4 WET AREA DETAILS 11-May-2017

A4 FURNITURE LAYOUT – GROUND FLOOR A4 FURNITURE LAYOUT


0055 KHEP-SD-AR-0055-00 11-May-2017
– FIRST FLOOR

A4 GROUND FLOOR LIFE SAFETY PLAN A4 FIRST FLOOR LIFE


0056 KHEP-SD-AR-0056-00 11-May-2017
SAFETY PLAN

0056.1 KHEP-SD-AR-0056-01 A4 GROUND FLOOR & FIRST FLOOR LIFE SAFETY PLAN 31-Jul-2017

0056.2 KHEP-SD-AR-0056-02 A4 GROUND FLOOR & FIRST FLOOR LIFE SAFETY PLAN 29-Nov-2017

0057 KHEP-SD-AR-0057-00 A4 DOORS SCHEDULEA4 WINDOWS SCHEDULE 11-May-2017

A6 DOORS SCHEDULE A6 WINDOWS SCHEDULE


0058 KHEP-SD-AR-0058-00 14-May-2017

0059 KHEP-SD-AR-0059-00 G Miscellaneous Details 1 25-May-2017

0060 KHEP-SD-AR-0060-00 G Typical Roofing Details 25-May-2017


0060.1 KHEP-SD-AR-0060-01 G Typical Roofing Details 9-Nov-2017

0061 KHEP-SD-AR-0061-00 G Wall Type Details 25-May-2017

0062 KHEP-SD-AR-0062-00 G Typical Partition Wall Sections 25-May-2017

0063 KHEP-SD-AR-0063-00 G Typical Ceiling Details 25-May-2017

0064 KHEP-SD-AR-0064-00 G Concrete Masonry Units Details 12-Jun-2017

0064.1 KHEP-SD-AR-0064-01 G Concrete Masonry Units Details 11-Jul-2017

B2 GROUND FLOOR PLAN, FIRST FLOOR PLAN & ROOF PLAN


(UNDER COMMERCIAL AGREEMENT)
0065 KHEP-SD-AR-0065-00 11-Jul-2017

B2 FRONT, REAR & SIDE ELEVATIONS (UNDER COMMERCIAL


0066 KHEP-SD-AR-0066-00 AGREEMENT) 11-Jul-2017

0067 KHEP-SD-AR-0067-00 G WINDOWS SCHEDULE 19-Jul-2017

0068 KHEP-SD-AR-0068-00 G DOORS SCHEDULE 19-Jul-2017

0068.1 KHEP-SD-AR-0068-01 G DOORS SCHEDULE 29-Aug-2017

0069 KHEP-SD-AR-0069-00 B2 Stair Details 6-Aug-2017

0069.1 KHEP-SD-AR-0069-01 B2 Stair Details 9-Oct-2017

0070 KHEP-SD-AR-0070-00 G EXTERIOR WALL DETAILS 9-Aug-2017

B2 Ground Floor & First Floor Flooring Plan (These drawings showing
the proposal of 600*600mm floor tile layout at dry areas and
0071 KHEP-SD-AR-0071-00 17-Sep-2017
330*330mm floor tile layout for wet areas, for your kind information
& review)
B2 Ground Floor & First Floor Flooring Plan (These drawings showing
the proposal of 450*450mm floor tile layout at dry areas and
0072 KHEP-SD-AR-0072-00 17-Sep-2017
330*330mm floor tile layout for wet areas, for your kind information
& review)

0073 KHEP-SD-AR-0073-00 AB Ground Floor & Roof Floor Plan 9-Oct-2017

0074 KHEP-SD-AR-0074-00 PT Ground Floor & Roof Floor Plan 9-Oct-2017

0075 KHEP-SD-AR-0075-00 PT GROUND FLOOR FIXTURE PLAN 9-Oct-2017

0076 KHEP-SD-AR-0076-00 PTA Ground Floor & Roof Floor Plan 9-Oct-2017

0077 KHEP-SD-AR-0077-00 PTA GROUND FLOOR FIXTURE PLAN 9-Oct-2017

0078 KHEP-SD-AR-0078-00 B2 WET AREA DETAILS 12-Oct-2017


0078.1 KHEP-SD-AR-0078-01 B2 WET AREA DETAILS 5-Dec-2017

0079 KHEP-SD-AR-0079-00 AB FRONT & REAR SIDE ELEVATION 12-Oct-2017

0080 KHEP-SD-AR-0080-00 PT FRONT & REAR SIDE ELEVATION 12-Oct-2017

0081 KHEP-SD-AR-0081-00 PTA FRONT & REAR SIDE ELEVATION 12-Oct-2017

G FINISHING SCHEDULE NOTE: PHYSICAL SAMPLE AS PER


0082 KHEP-SD-AR-0082-00 2-Nov-2017
INSTALLED AT MOCK-UP (CLUSTER B2)

0083 KHEP-SD-AR-0083-00 G Garage Door Details 28-Dec-2017

0084 KHEP-SD-AR-0084-00 G Kitchen Cabinets Details 3-Jan-2018

G Fire Related door, Acoustic Door, Flush Wood Door, Hollow Metal
0085 KHEP-SD-AR-0085-00 3-Jan-2018
Door & Metal & Wooden Doors Details

0086 KHEP-SD-AR-0086-00 G Wardrobe Details 3-Jan-2018

0086.1 KHEP-SD-AR-0086-01 G Wardrobe Details 27-Jan-2018

0087 KHEP-SD-AR-0087-00 G Staircase & Balsony Railing Details 4-Jan-2018

0088 KHEP-SD-AR-0088-00 G Aluminum Doors & Windows Details 6-Jan-2018

0089 KHEP-SD-AR-0089-00 G Aluminum Louver Details 6-Jan-2018

0089.1 KHEP-SD-AR-0089-01 G Aluminum Louver Details 18-Jan-2018

0089.2 KHEP-SD-AR-0089-02 G Aluminum Louver Details 14-Feb-2018

0090 KHEP-SD-AR-0090-00 G Aluminum Trellis Details 13-Jan-2018

0091 KHEP-SD-AR-0091-00 G Villa B for Disabilities wet area & kitchen area details 27-Jan-2018

0091.1 KHEP-SD-AR-0091-01 G Villa B for Disabilities wet area & kitchen area details 25-Feb-2018

0092 KHEP-SD-AR-0092-00 G Mirror with Medical Cabinet Details 6-Feb-2018

0092.1 KHEP-SD-AR-0092-01 G Mirror with Medical Cabinet Details 15-Feb-2018

0093 KHEP-SD-AR-0093-00 G Galvanized Gate Details 19-Feb-2018


0094 KHEP-SD-AR-0094-00 A4 Roof Floor Plan (Showing Rope Hook Details) 21-Feb-2018

0095 KHEP-SD-AR-0095-00 A6 Roof Floor Plan (Showing Rope Hook Details) 21-Feb-2018

0096 KHEP-SD-AR-0096-00 B2 Roof Floor Plan (Showing Rope Hook Details) 21-Feb-2018

G Staircase & Balsony Railing Details (Typical Details for Cluster Type
0097 KHEP-SD-AR-0097-00 26-Feb-2018
A)

CIVIL
0001 KHEP-SD-32-0001-00 Road 1 2 & 4 Overall Plan 15-Jan-2017

0002 KHEP-SD-01-0002-00 Mobilization grading level and proposed temporary road 19-Jan-2017

0003 KHEP-SD-31-0001-00 Water Pond Coordinate & New Bench Mark Overall Layout Plan 25-Jan-2017

0004 KHEP-SD-01-0003-00 New Bench Mark Layout Plan with Land Surveyor Report 26-Jan-2017

0004.1 KHEP-SD-CI-0003-01 New Bench Mark Layout Plan with Land Surveyor Report 4-Mar-2017

0004 KHEP-SD-CI-0004-00 TYPICAL GRP MANHOLE DETAILS 17-May-2017

0004.1 KHEP-SD-CI-0004-01 TYPICAL GRP MANHOLE DETAILS 8-Jun-2017

0004.2 KHEP-SD-CI-0004-02 TYPICAL GRP MANHOLE DETAILS 10-Oct-2017

0005 KHEP-SD-CI-0005-00 Existing Ground Level Plan 29-Jan-2017

Grading contour Level FFL & excavation level for over all site with
0006 KHEP-SD-CI-0006-00 15-Feb-2017
elevation table

02/22/2017
0007 KHEP-SD-CI-0007-00 Storm Water Drainage Layout (Master Plan)
28-02-2017
0007.1 KHEP-SD-CI-0007-01 Storm Drainage Overall Layout Plan 1 of 12 11-Apr-2017

0007.2 KHEP-SD-CI-0007-02 LONGITUDINAL PROFILE OF LINE-(01 TO 40) 8-May-2017

0007.3 KHEP-SD-CI-0007-03 LONGITUDINAL PROFILE OF LINE-(01 TO 40) 31-May-2017

0008 KHEP-SD-CI-0008-00 Retention Basins Coordinates With Finish Grading Levels Layout Plan 25-02-2017 28-02-2017

0009 KHEP-SD-CI-0009-00 Grading Level, Over All Site Plan 25-02-2017 28-02-2017

009.1 KHEP-SD-CI-0009-01 Grading Level, Over All Site Plan 14-Mar-2017

0010 KHEP-SD-CI-0010-00 Road Proposed Grading Levels, Over All Site Plan 2-Mar-2017
0010.1 KHEP-SD-CI-0010-01 Road Proposed Grading Levels, Over All Site Plan 23-Mar-2017

0011 KHEP-SD-CI-0011-00 ROAD WORKS-CROSS SECTIONS (SEC-001 TO 35 & SEC-037 TO 64) 08-03-2017 11-03-2017

0012 KHEP-SD-CI-0012-00 SANITARY SEWER SYSTEM- OVERALL LAYOUT PLAN 11-Mar-2017

0012.1 KHEP-SD-CI-0012-01 Sanitary Sewer System - Overall Layout Plan 29-Mar-2017

0013 KHEP-SD-CI-0013-00 Trench, Backfill, Manholes, Cover & Inspection Chamber Details 12-Mar-2017

0013.1 KHEP-SD-CI-0013-01 Sanitary Sewer Line-Manhole Schedule 29-Mar-2017

Sanitary Sewer Manhole Schedule, Trench, Backfill & Inspection


0013.2 KHEP-SD-CI-0013-02 10-Apr-2017
Chamber Details

0013.3 KHEP-SD-CI-0013-03 Trench,Backfill,Precast Manholes & Cover frames details 18-Apr-2017

0014 KHEP-SD-CI-0014-00 Typical Road Cross Sections With Under Ground Utilities 21-Mar-2017

0015 KHEP-SD-CI-0015-00 STORM DRAINAGE NETWORK MANHOLES & PIPE LINE SCHEDULE 15-Apr-2017

0015.1 KHEP-SD-CI-0015-01 STORM DRAINAGE NETWORK MANHOLES & PIPE LINE SCHEDULE 26-Apr-2017

0015.2 KHEP-SD-CI-0015-02 STORM DRAINAGE NETWORK MANHOLES & PIPE LINE SCHEDULE 30-May-2017

POTABLE & FIRE FIGHTING OVER-ALL LAYOUT PLANPOTABLE &


0016 KHEP-SD-CI-0016-00 FIRE FIGHTING LAYOUT 24-Apr-2017
(PART PLANS – SHEET 01 TO 12)

0016.1 KHEP-SD-CI-0016-01 POTABLE & FIRE FIGHTING OVER-ALL LAYOUT PLAN 4-Jun-2017

0016.2 KHEP-SD-CI-0016-02 POTABLE & FIRE FIGHTING OVER-ALL LAYOUT PLAN 23-Oct-2017

POTABLE & FIRE FIGHTING OVER-ALL LAYOUT PLAN


POTABLE & FIRE FIGHTING LAYOUT
0016.3 KHEP-SD-CI-0016-03 29-Nov-2017
(PART PLANS – SHEET 01 TO 12)

LONGITUDINAL PROFILE OF LINE-01


LONGITUDINAL PROFILE OF LINE-02
LONGITUDINAL PROFILE OF LINE-(03 TO 08)
LONGITUDINAL PROFILE OF LINE-(09 TO 13)
LONGITUDINAL PROFILE OF LINE-(14 TO 16)
0017 KHEP-SD-CI-0017-00 25-Apr-2017
LONGITUDINAL PROFILE OF LINE-(17 TO 19)
LONGITUDINAL PROFILE OF LINE-(20 TO25)
LONGITUDINAL PROFILE OF LINE-(26 TO 28)
LONGITUDINAL PROFILE OF LINE-(29 TO 31)
LONGITUDINAL PROFILE OF LINE-(32 TO 37)
0018 KHEP-SD-CI-0018-00 STORM DRAINAGE OVER-ALL LAYOUT PLAN 26-Apr-2017

STORM DRAINAGE DETAILS OF PRECAST MANHOLES


DEPTH<3000mm
STORM DRAINAGE DETAILS OF PRECAST MANHOLES DEPTH 3000
TO 6000mm
0019 KHEP-SD-CI-0019-00 1-May-2017
STORM DRAINAGE TYPICAL DETAILS
STORM DRAINAGE STANDARD CHAMBER AND MANHOLE RINGS
DETAILS

STORM DRAINAGE DETAILS OF PRECAST MANHOLES


DEPTH<3000mm
STORM DRAINAGE DETAILS OF PRECAST MANHOLES DEPTH 3000
TO 6000mm
0019.1 KHEP-SD-CI-0019-01 14-May-2017
STORM DRAINAGE TYPICAL DETAILS
STORM DRAINAGE STANDARD CHAMBER AND MANHOLE RINGS
DETAILS

0020 KHEP-SD-CI-0020-00 STORM DRAINAGE NETWORK CAST-IN-SITU MANHOLES DETAILS 1-May-2017

STORM DRAINAGE CATCH BASINS DETAILS PART 1 OF 2


STORM DRAINAGE CATCH BASINS DETAILS PART 1 OF 2
0021 KHEP-SD-CI-0021-00 1-May-2017
STORM DRAINAGE SERVICE CONNECTION DIRECT DISCHARGE
DETAILS
STORM DRAINAGE CATCH BASINS DETAILS PART 1 OF 2
STORM DRAINAGE CATCH BASINS DETAILS PART 1 OF 2
0021.1 KHEP-SD-CI-0021-01 14-May-2017
STORM DRAINAGE SERVICE CONNECTION DIRECT DISCHARGE
DETAILS

IRRIGATION LAYOUT OVER-ALL PLAN


0022 KHEP-SD-CI-0022-00 IRRIGATION LAYOUT (PART PLAN – SHEET 01 to 12) 4-May-2017

IRRIGATION LAYOUT OVER-ALL PLAN (PART PLAN – SHEET 01 to


0022.1 KHEP-SD-CI-0022-01 12) 2-Aug-2017
IRRIGATION LAYOUT OVER-ALL PLAN (PART PLAN – SHEET 01 to
0022.2 KHEP-SD-CI-0022-02 12) 20-Aug-2017

IRRIGATION LAYOUT OVER-ALL PLAN (PART PLAN – SHEET 01 to


0022.3 KHEP-SD-CI-0022-03 12) 13-Nov-2017

POTABLE & FIRE FIGHTING NETWORK


0023 KHEP-SD-CI-0023-00 11-May-2017
TIE-IN POINT VALVE CHAMBER SECTIONS & DETAILS

POTABLE & FIRE FIGHTING NETWORK


0023.1 KHEP-SD-CI-0023-01 1-Jun-2017
TIE-IN POINT VALVE CHAMBER SECTIONS & DETAILS

POTABLE & FIRE FIGHTING NETWORK


0023.2 KHEP-SD-CI-0023-02 14-Jan-2018
TIE-IN POINT VALVE CHAMBER SECTIONS & DETAILS

0024 KHEP-SD-CI-0024-00 SANITARY SEWER MANHOLES BACKDROP DETAIL 21-May-2017

0024.1 KHEP-SD-CI-0024-01 SANITARY SEWER MANHOLES BACKDROP DETAIL 6-Jun-2017

0024.2 KHEP-SD-CI-0024-02 SANITARY SEWER MANHOLES BACKDROP DETAIL 22-Jun-2017

0024.3 KHEP-SD-CI-0024-03 SANITARY SEWER MANHOLES BACKDROP DETAIL 23-Aug-2017

0025 KHEP-SD-CI-0025-00 COMBINED UTILITIES OVER-ALL LAYOUT PLAN 22-May-2017

0025.1 KHEP-SD-CI-0025-01 COMBINED UTILITIES OVER-ALL LAYOUT PLAN 19-Jul-2017

0026 KHEP-SD-CI-0026-00 RETENTION BASIN-1 PLAN & SECTIONS 23-May-2017

0026.1 KHEP-SD-CI-0026-01 RETENTION BASIN-1 PLAN & SECTIONS 7-Aug-2017

0026.2 KHEP-SD-CI-0026-02 RETENTION BASIN-1 PLAN & SECTIONS 19-Aug-2017

0026.3 KHEP-SD-CI-0026-03 RETENTION BASIN-1 PLAN & SECTIONS 12-Sep-2017


ROAD SETTING-OUT OVER-ALL LAYOUT PLAN
0027 KHEP-SD-CI-0027-00 24-May-2017

0028 KHEP-SD-CI-0028-00 HARDSCAPE TYPICAL DETAILS 27-May-2017

0028.1 KHEP-SD-CI-0028-01 HARDSCAPE TYPICAL DETAILS 22-Jun-2017


POTABLE & FIRE FIGHTING NETWORK AIR VALVE, WASHOUT
VALVE & TYPICAL PIPE TRENCH & PIPE BEDDING CHAMBER
0029 KHEP-SD-CI-0029-00 DETAILS 4-Jun-2017

POTABLE & FIRE FIGHTING NETWORK AIR VALVE, WASHOUT


VALVE & TYPICAL PIPE TRENCH & PIPE BEDDING CHAMBER
0029.1 KHEP-SD-CI-0029-01 DETAILS 9-Aug-2017

POTABLE & FIRE FIGHTING NETWORK AIR VALVE, WASHOUT


VALVE & TYPICAL PIPE TRENCH & PIPE BEDDING CHAMBER
0029.2 KHEP-SD-CI-0029-02 DETAILS 8-Oct-2017

POTABLE & FIRE FIGHTING NETWORK AIR VALVE, WASHOUT


0029.3 KHEP-SD-CI-0029-03 VALVE & TYPICAL PIPE TRENCH & PIPE BEDDING CHAMBER 18-Oct-2017
DETAILS

POTABLE & FIRE FIGHTING NETWORK FIRE HYDRANT DETAILS


0030 KHEP-SD-CI-0030-00 4-Jun-2017

POTABLE & FIRE FIGHTING NETWORK FIRE HYDRANT DETAILS


0030.1 KHEP-SD-CI-0030-01 22-Jun-2017

0030.2 KHEP-SD-CI-0030-02 POTABLE & FIRE FIGHTING NETWORK FIRE HYDRANT DETAILS 9-Aug-2017

STORM DRAINAGE NETWORK PROTECTION SLAB DETAILS


0031 KHEP-SD-CI-0031-00 4-Jul-2017
STORM DRAINAGE NETWORK PROTECTION SLAB DETAILS
0031.1 KHEP-SD-CI-0031-01 23-Jul-2017

0032 KHEP-SD-CI-0032-00 Typical GRP Inspection Chambers Details 16-Jul-2017

0032.1 KHEP-SD-CI-0032-01 Typical GRP Inspection Chambers Details 23-Jul-2017

0032.2 KHEP-SD-CI-0032-02 Typical GRP Inspection Chambers Details 6-Aug-2017


STORM DRAINAGE NETWORK OUTFALL DETAILS
0033 KHEP-SD-CI-0033-00 18-Jul-2017

STORM DRAINAGE NETWORK OUTFALL DETAILS


0033.1 KHEP-SD-CI-0033-01 6-Aug-2017

STORM DRAINAGE NETWORK OUTFALL DETAILS


0033.2 KHEP-SD-CI-0033-02 17-Oct-2017

0034 KHEP-SD-CI-0034-00 Hardscape Layout Over - All Plan 19-Jul-2017

0035 KHEP-SD-CI-0035-00 COMBINED UTILITIES SECTION & DETAILS SHEET 01 TO 05 19-Jul-2017

IRRIGATION WATER NETWORK TYPICAL PIPE TRENCH,PIPE


0036 KHEP-SD-CI-0036-00 BEDDING & BURIED, AIR-VALVE, WASHOUT & TIE-IN-VALVE 2-Aug-2017
CHAMBER DETAILS
IRRIGATION WATER NETWORK TYPICAL PIPE TRENCH,PIPE
0036.1 KHEP-SD-CI-0036-01 BEDDING & BURIED, AIR-VALVE, WASHOUT & TIE-IN-VALVE 13-Aug-2017
CHAMBER DETAILS

0037 KHEP-SD-CI-0037-00 Road Signage’s Installation Details 9-Aug-2017

Road Signage’s | Signage Installation Details (Layout plan shall be


0037.1 KHEP-SD-CI-0037-01 10-Sep-2017
submitted separately as per comment on KHEP-SD-CI-0037-00)

Road Signage’s | Signage Installation Details (Layout plan shall be


0037.2 KHEP-SD-CI-0037-02 25-Sep-2017
submitted separately as per comment on KHEP-SD-CI-0037-00)

Road Signage’s | Signage Installation Details (Layout plan shall be


0037.3 KHEP-SD-CI-0037-03 8-Oct-2017
submitted separately as per comment on KHEP-SD-CI-0037-00)

POTABLE & FIRE FIGHTING NETWORK BURIED GATE VALVE &


0038 KHEP-SD-CI-0038-00 HOUSE CONNECTION DETAILS 9-Aug-2017

POTABLE & FIRE FIGHTING NETWORK BURIED GATE VALVE &


0038.1 KHEP-SD-CI-0038-01 18-Oct-2017
HOUSE CONNECTION DETAILS

STORM DRAINAGE NETWORK PRECAST & CAST IN SUIT MANHOLES


0039 KHEP-SD-CI-0039-00 DETAILS 9-Aug-2017

STORM DRAINAGE NETWORK PRECAST & CAST IN SUIT MANHOLES


0039.1 KHEP-SD-CI-0039-01 DETAILS 13-Aug-2017

0040 KHEP-SD-CI-0040-00 Typical Road Marking and Signages at Intersection 10-Sep-2017

0040.1 KHEP-SD-CI-0040-01 Typical Road Marking and Signages at Intersection 17-Sep-2017

STORM DRAINAGE NETWORK CATCH BASINS SCHEDULE


0041 KHEP-SD-CI-0041-00 26-Sep-2017

STORM DRAINAGE NETWORK CATCH BASINS SCHEDULE


0041.1 KHEP-SD-CI-0041-01 10-Oct-2017

STORM DRAINAGE NETWORK CATCH BASINS SCHEDULE


0041.2 KHEP-SD-CI-0041-02 31-Oct-2017

0042 KHEP-SD-CI-0042-00 INSPECTION CHAMBER PIPE LINE & BACKDROPS SCHEDULE 5-Oct-2017

0042.1 KHEP-SD-CI-0042-01 INSPECTION CHAMBER PIPE LINE & BACKDROPS SCHEDULE 23-Oct-2017

RETENTION BASIN-3 LAYOUT PLAN , SECTION & DETAIL


0043 KHEP-SD-CI-0043-00 15-Oct-2017
POTABLE & FIRE FIGHTING NETWORK THRUST BLOCK FOR
0044 KHEP-SD-CI-0044-00 HORIZONTAL BENDS DETAILS 25-Oct-2017

RETENTION BASIN-4 LAYOUT PLAN , SECTION & DETAIL


0045 KHEP-SD-CI-0045-00 25-Oct-2017

RETENTION BASIN-5 LAYOUT PLAN , SECTION & DETAIL


0046 KHEP-SD-CI-0046-00 25-Oct-2017

IRRIGATION SCHEDULE - IRRIGATION WATER NETWORK


CONTROLLER
0047 KHEP-SD-CI-0047-00 13-Nov-2017
CONNECTION TYPICAL DDETAIL

0048 KHEP-SD-CI-0048-00 Irrigation Water Network Thrust Block Details 5-Dec-2017

0049 KHEP-SD-CI-0049-00 Finish Grading Over all Layout plan 7-Dec-2017


0049.1 KHEP-SD-CI-0049-01 Finish Grading Over all Layout plan 31-Dec-2017

0050 KHEP-SD-CI-0050-00 Box Culvert Layout Plan & Sections 16-Dec-2017

0050.1 KHEP-SD-CI-0050-01 Box Culvert 8 Layout Plan & Sections 30-Dec-2017

0050.2 KHEP-SD-CI-0050-02 Box Culvert 8 Layout Plan & Sections 23-Jan-2018

0051 KHEP-SD-CI-0051-00 INTERSECTION DETAILS @ ROAD-04 26-Dec-2017

Public toilet B3 & ancillary building B4 proposed finish grading level &
ground floor finish levels
0052 KHEP-SD-CI-0052-00 17-Jan-2018
Public toilet B1,B2 proposed finish grading level & ground floor finish
levels
Public toilet B3 & ancillary building B4 proposed finish grading level &
ground floor finish levels
0052-01 KHEP-SD-CI-0052-01 29-Jan-2018
Public toilet B1,B2 proposed finish grading level & ground floor finish
levels

Storm DITCH Overall Layout Plan Storm DICH Layout (Part Plan -
0053 KHEP-SD-CI-0053-00 26-Feb-2018
Sheet 01 - 12)

ELECTRICAL

0001 KHEP-SD-EL-0001-00 Ground Floor, First Floor, Roof Floor Fire Alarm System Layout 23-Feb-2017

0001.1 KHEP-SD-EL-0001-01 Ground Floor, First Floor, Roof Floor Fire Alarm System Layout 9-Mar-2017

0001.2 KHEP-SD-EL-0001-02 B2 Ground Floor & First Floor Fire Alarm System Layout 1-Apr-2017

B2 Ground Floor First Floor Fire Alarm System Layout & Fire Alarm
0001.3 KHEP-SD-EL-0001-03 28-Dec-2017
Single Line Diagram

B2 Ground Floor First Floor Fire Alarm single line Diagram, Devices
0001.4 KHEP-SD-EL-0001-04 Tpical Installation, Temination details 1,2 & 3XSFS1B Fire Alarm 4-Feb-2018
Control Panel Components

0002 KHEP-SD-EL-0002-00 B2 Ground Floor, First Floor, Telephone and Data System Layout 23-Feb-2017

0002.1 KHEP-SD-EL-0002-01 B2 Ground Floor, First Floor, Telephone and Data System Layout 3-Apr-2017

0002.2 KHEP-SD-EL-0002-02 B2 Ground Floor, First Floor, Telephone and Data System Layout 15-Oct-2017

0002.3 KHEP-SD-EL-0002-03 B2 Ground & First Floor Telephone and Data System Layout 12-Dec-2017

0002.4 KHEP-SD-EL-0002-04 B2 Ground & First Floor Telephone and Data System Layout 17-Jan-2018

Ground Floor, First Floor, Roof Floor Mechanical Power System


0003 KHEP-SD-EL-0003-00 23-Feb-2017
Layout
B2 Ground Floor, First Floor, Roof Floor Mechanical Power System
0003.1 KHEP-SD-EL-0003-01 9-Mar-2017
Layout

B2 Ground Floor, First Floor, Roof Floor Mechanical Power System


0003.2 KHEP-SD-EL-0003-02 31-May-2017
Layout

B2 Ground Floor, First Floor, Roof Floor Mechanical Power System


0003.3 KHEP-SD-EL-0003-03 15-Oct-2017
Layout

0004 KHEP-SD-EL-0004-00 Med. Voltage Single Line Diagram, Installation, Overall Plan & etc. 20-02-2017 28-02-2017

0004.1 KHEP-SD-EL-0004-01 Med. Voltage Single Line Diagram, Installation, Overall Plan & etc. 23-Mar-2017

0004.2 KHEP-SD-EL-0004-02 Med. Voltage Single Line Diagram, Installation, Overall Plan & etc. 15-Apr-2017

0005 KHEP-SD-EL-0005-00 A6-B4-B6 Ground Floor Earthling System 2-Mar-2017

0006 KHEP-SD-EL-0006-00 Power For CCTV System 8-Mar-2017

0006.1 KHEP-SD-EL-0006-01 Power For CCTV System 30-Mar-2017

0007 KHEP-SD-EL-0007-00 B2 Panel board Schedule for Villa 1 & 2 16-Mar-2017

0007.1 KHEP-SD-EL-0007-01 B2 Panel board Schedule for Villa 1 & 2 3-Apr-2017

B2 Cluster B2- Panel board Schedule for Villa 1


0007.2 KHEP-SD-EL-0007-02 23-Apr-2017
B2 Cluster B2- Panel board Schedule for Villa 2

B2 Cluster B2- Panel board Schedule for Villa 1 & Villa 2


0007.3 KHEP-SD-EL-0007-03 15-Oct-2017

B2 Cluster B2- Panel board Schedule for Villa 1 & Villa 2


0007.4 KHEP-SD-EL-0007-04 1-Nov-2017
0008 KHEP-SD-EL-0008-00 A6 Ground Floor Power System Layout & etc. 18-Mar-2017

0008.1 KHEP-SD-EL-0008-01 A6 Ground Floor,FF & RF Power System Layout 11-Apr-2017

0008.2 KHEP-SD-EL-0008-02 A6 Ground Floor,FF & RF Power System Layout 8-May-2017

0008.3 KHEP-SD-EL-0008-03 A6 Ground Floor,FF & RF Power System Layout 5-Dec-2017

0009 KHEP-SD-EL-0009-00 Cover Page, Drawing Index, Legend and Abbreviation & etc. 19-Mar-2017

0010 KHEP-SD-EL-0010-00 A6 Ground Floor Fire Alarm System Layout 20-Mar-2017

0010.1 KHEP-SD-EL-0010-01 A6 Ground Floor, FF Fire Alarm System Layout 3-Apr-2017

A6 Ground Floor First Floor Fire Alarm System Layout & Fire Alarm
0010.2 KHEP-SD-EL-0010-02 28-Dec-2017
Single Line Diagram

A6 Ground Floor First Floor Fire Alarm single line Diagram, Devices
0010.3 KHEP-SD-EL-0010-03 Tpical Installation, Temination details 1,2 & 3XSFS1B Fire Alarm 4-Feb-2018
Control Panel Components

0011 KHEP-SD-EL-0011-00 A6 Ground Floor Mechanical Power System Layout 20-Mar-2017

A6 Cluster A6-Ground Floor,FF & RF Mechanical Power System


0011.1 KHEP-SD-EL-0011-01 18-Apr-2017
Layout

CLUSTER A6- GROUND FLOOR MECHANICAL POWER SYSTEM


LAYOUT
0011.2 KHEP-SD-EL-0011-02 14-May-2017
CLUSTER A6- FIRST FLOOR MECHANICAL POWER SYSTEM LAYOUT
CLUSTER A6- ROOF FLOOR MECHANICAL POWER SYSTEM LAYOUT

CLUSTER A6- GROUND FLOOR,FIRST FLOOR & ROOF FLOOR


0011.3 KHEP-SD-EL-0011-03 31-May-2017
MECHANICAL POWER SYSTEM LAYOUT
CLUSTER A6- GROUND FLOOR,FIRST FLOOR & ROOF FLOOR
0011.4 KHEP-SD-EL-0011-04 15-Oct-2017
MECHANICAL POWER SYSTEM LAYOUT

0012 KHEP-SD-EL-0012-00 A6 PANELBOARD SCHEDULE FOR VILLA 1 TO 6 22-Mar-2017

A6 Cluster A6- Panel board Schedule for Villa 1


0012.1 KHEP-SD-EL-0012-01 23-Apr-2017
A6 Cluster A6- Panel board Schedule for Villa (2,3,4,5 & 6)

A6 Cluster A6- Panel board Schedule for Villa 1


0012.2 KHEP-SD-EL-0012-02 15-Oct-2017
A6 Cluster A6- Panel board Schedule for Villa (2,3,4,5 & 6)

A6 Cluster A6- Panel board Schedule for Villa 1


0012.3 KHEP-SD-EL-0012-03 1-Nov-2017
A6 Cluster A6- Panel board Schedule for Villa (2,3,4,5 & 6)

0013 KHEP-SD-EL-0013-00 A4 GROUND FLOOR EARTHING SYSTEM LAYOUT 22-Mar-2017

0013.1 KHEP-SD-EL-0013-01 A4 GROUND FLOOR EARTHING SYSTEM LAYOUT 10-Apr-2017

0014 KHEP-SD-EL-0014-00 A4 GROUND FLOOR, FF & RF LIGHTING SYSTEM LAYOUT 2-Apr-2017

A4 GROUND FLOOR LIGHTING SYSTEM LAYOUT


0014.1 KHEP-SD-EL-0014-01 A4 FIRST FLOOR LIGHTING SYSTEM LAYOUT 30-Apr-2017
A4 ROOF FLOOR LIGHTING SYSTEM LAYOUT
Cluster A4 GROUND FLOOR, FIRST FLOOR & ROOF FLOOR
0014.2 KHEP-SD-EL-0014-02 LIGHTING SYSTEM LAYOUT 25-May-2017

Cluster A4 GROUND FLOOR, FIRST FLOOR & ROOF FLOOR


0014.3 KHEP-SD-EL-0014-03 LIGHTING SYSTEM LAYOUT 27-Jul-2017

0015 KHEP-SD-EL-0015-00 A4 GROUND FLOOR, FF & RF POWER SYSTEM LAYOUT 2-Apr-2017

0015.1 KHEP-SD-EL-0015-01 A4 Cluster A4- Ground Floor,FF & RF Power System Layout 18-Apr-2017

CLUSTER A4- GROUND FLOOR POWER SYSTEM LAYOUT


0015.2 KHEP-SD-EL-0015-02 CLUSTER A4- FIRST FLOOR POWER SYSTEM LAYOUT 11-May-2017
CLUSTER A4- ROOF FLOOR POWER SYSTEM LAYOUT

0015.3 KHEP-SD-EL-0015-03 CLUSTER A4- GROUND & FIRST FLOOR POWER SYSTEM LAYOUT 12-Dec-2017

0016 KHEP-SD-EL-0016-00 A4 GROUND FLOOR, FF & RF MECHANICAL POWER SYSTEM LAYOUT 2-Apr-2017

0016.1 KHEP-SD-EL-0016-01 A4 GROUND FLOOR, FF & RF MECHANICAL POWER SYSTEM LAYOUT 15-Apr-2017

A4 GROUND FLOOR, FIRST FLOOR & ROOF FLOOR MECHANICAL


0016.2 KHEP-SD-EL-0016-02 5-Jun-2017
POWER SYSTEM LAYOUT

0017 KHEP-SD-EL-0017-00 A6 PANEL BOARD SCHEDULE FOR VILLA (1,2,3,4,5 & 6) 2-Apr-2017

A4 Cluster A4- Panel board Schedule for Villa 1


0017.1 KHEP-SD-EL-0017-01 23-Apr-2017
A4 Cluster A4- Panel board Schedule for Villa (2,3,4,5 & 6)
A4 Cluster A4- Panel board Schedule for Villa 1
0017.2 KHEP-SD-EL-0017-02 1-Nov-2017
A4 Cluster A4- Panel board Schedule for Villa (2,3,4,5 & 6)

0018 KHEP-SD-EL-0018-00 A4 GROUND FLOOR & FF FIRE ALARM SYSTEM LAYOUT 2-Apr-2017

A4 Ground Floor First Floor Fire Alarm System Layout & Fire Alarm
0019 KHEP-SD-EL-0018-01 28-Dec-2017
Single Line Diagram

A4 GROUND FLOOR & FF TELEPHONE AND DATA LAYOUT SYSTEM


0019 KHEP-SD-EL-0019-00 2-Apr-2017
LAYOUT

0019.1 KHEP-SD-EL-0019-01 A4 GROUND FLOOR & FF TELEPHONE AND DATA LAYOUT 15-Apr-2017

0019.2 KHEP-SD-EL-0019-02 A4 GROUND & FIRST FLOOR TELEPHONE AND DATA LAYOUT 12-Dec-2017

0019.3 KHEP-SD-EL-0019-03 A4 GROUND & FIRST FLOOR TELEPHONE AND DATA LAYOUT 17-Jan-2018
0020 KHEP-SD-EL-0020-00 MV CABLE ROUTING PART 1 OF 12 9-Apr-2017

0021 KHEP-SD-EL-0021-00 SITE LIGHTING SHOP DRAWING PART 1 OF 12 9-Apr-2017

0021.1 KHEP-SD-EL-0021-01 SITE LIGHTING SHOP DRAWING PART 1 OF 12 3-May-2017

0021.2 KHEP-SD-EL-0021-02 SITE LIGHTING SHOP DRAWING PART 1 OF 12 6-Jun-2017

0022 KHEP-SD-EL-0022-00 LANDSCAPE LIGHTING LAYOUT PART 1 OF 10 9-Apr-2017


0022.1 KHEP-SD-EL-0022-01 LANDSCAPE LIGHTING LAYOUT PART 1 OF 10 24-May-2017

0023 KHEP-SD-EL-0023-00 LV CABLE ROUTING LAYOUT( PART 1 OF 12) 9-Apr-2017

0024 KHEP-SD-EL-0024-00 SITE LIGHTING LAYOUT(OVERALL PLAN) 10-Apr-2017

0025 KHEP-SD-EL-0025-00 LV CABLE ROUTING LAYOUT (OVERALL PLAN) 10-Apr-2017

0026 KHEP-SD-EL-0026-00 B2 GROUND FLOOR EARTHING SYSTEM LAYOUT 12-Apr-2017

B4 GROUND FLOOR,FF & RF LIGHTING SYSTEM LAYOUT


17-04-2017
CLUSTER B4-GROUND FLOOR LIGHTING SYSTEM LAYOUT
0027 KHEP-SD-EL-0027-00 30-04-2017-Recall
CLUSTER B4-FIRST FLOOR LIGHTING SYSTEM LAYOUT
(Resubmit-02-05-2017
CLUSTER B4-ROOF FLOOR LIGHTING SYSTEM LAYOUT

Cluster B4 GROUND FLOOR,FIRST FLOOR & ROOF FLOOR


0027.1 KHEP-SD-EL-0027-01 25-May-2017
LIGHTING SYSTEM LAYOUT

Cluster B4 GROUND FLOOR,FIRST FLOOR & ROOF FLOOR


0027.2 KHEP-SD-EL-0027-02 27-Jul-2017
LIGHTING SYSTEM LAYOUT

0028 KHEP-SD-EL-0028-00 B4 GROUND FLOOR,FF & RF POWER SYSTEM LAYOUT 17-Apr-2017

0028.1 KHEP-SD-EL-0028-01 B4 GROUND FLOOR,FF & RF POWER SYSTEM LAYOUT 3-May-2017

0028.2 KHEP-SD-EL-0028-02 B4 GROUND FLOOR,FF & RF POWER SYSTEM LAYOUT 31-May-2017

0029 KHEP-SD-EL-0029-00 B4 GROUND FLOOR,FF & RF MECHANICAL POWER SYSTEM LAYOUT 17-Apr-2017

0029.1 KHEP-SD-EL-0029-01 B4 GROUND FLOOR,FF & RF MECHANICAL POWER SYSTEM LAYOUT 8-May-2017

0029.2 KHEP-SD-EL-0029-02 B4 GROUND FLOOR,FF & RF MECHANICAL POWER SYSTEM LAYOUT 31-May-2017

0030 KHEP-SD-EL-0030-00 B4 GROUND FLOOR & FF TELEPHONE AND DATA SYSTEM LAYOUT 17-Apr-2017

B4 GROUND & FIRST FLOOR TELEPHONE AND DATA SYSTEM


0030.1 KHEP-SD-EL-0030-01 12-Dec-2017
LAYOUT
B4 GROUND & FIRST FLOOR TELEPHONE AND DATA SYSTEM
0030.2 KHEP-SD-EL-0030-02 18-Jan-2018
LAYOUT

0031 KHEP-SD-EL-0031-00 B4 GROUND FLOOR & FF FIRE ALARM SYSTEM LAYOUT 17-Apr-2017
B4 Ground Floor First Floor Fire Alarm System Layout & Fire Alarm
0031.1 KHEP-SD-EL-0031-01 28-Dec-2017
Single Line Diagram

0032 KHEP-SD-EL-0032-00 B4 PANELBOARD SCHEDULE FOR VILLA (1,2,3&4) 17-Apr-2017

0032.1 KHEP-SD-EL-0032-01 B4 PANELBOARD SCHEDULE FOR VILLA (1,2,3&4) 1-Nov-2017

0033 KHEP-SD-EL-0033-00 B4 LV SINGLE LINE DIAGRAM SHEET 18 OF 18 17-Apr-2017

CLUSTER B2- GROUND FLOOR POWER SYSTEM LAYOUT


0034 KHEP-SD-EL-0034-00 CLUSTER B2- FIRST FLOOR POWER SYSTEM LAYOUT 25-Apr-2017
CLUSTER B2- ROOF FLOOR POWER SYSTEM LAYOUT

CLUSTER B2- GROUND FLOOR POWER SYSTEM LAYOUT


0034.1 KHEP-SD-EL-0034-01 CLUSTER B2- FIRST FLOOR POWER SYSTEM LAYOUT 3-May-2017
CLUSTER B2- ROOF FLOOR POWER SYSTEM LAYOUT

CLUSTER B2- GROUND FLOOR POWER SYSTEM LAYOUT


0034.2 KHEP-SD-EL-0034-02 CLUSTER B2- FIRST FLOOR POWER SYSTEM LAYOUT 14-Jun-2017
CLUSTER B2- ROOF FLOOR POWER SYSTEM LAYOUT
CLUSTER B2- GROUND FLOOR POWER SYSTEM LAYOUT
0034.3 KHEP-SD-EL-0034-03 CLUSTER B2- FIRST FLOOR POWER SYSTEM LAYOUT 7-Nov-2017
CLUSTER B2- ROOF FLOOR POWER SYSTEM LAYOUT
CLUSTER A6- GROUND FLOOR TELEPHONE AND DATA LAYOUT
SYSTEM LAYOUT
0035 KHEP-SD-EL-0035-00 29-Apr-2017
CLUSTER A6- FIRST FLOOR TELEPHONE AND DATA LAYOUT
SYSTEM LAYOUT
CLUSTER A6- GROUND FLOOR TELEPHONE AND DATA LAYOUT
SYSTEM LAYOUT
0035.1 KHEP-SD-EL-0035-01 15-Oct-2017
CLUSTER A6- FIRST FLOOR TELEPHONE AND DATA LAYOUT
SYSTEM LAYOUT

CLUSTER A6- GROUND FLOOR & FIRST FLOOR TELEPHONE AND


0035.2 KHEP-SD-EL-0035-02 DATA LAYOUT SYSTEM LAYOUT 29-Oct-2017

CLUSTER A6- GROUND FLOOR & FIRST FLOOR TELEPHONE AND


0035.3 KHEP-SD-EL-0035-03 DATA LAYOUT SYSTEM LAYOUT 12-Dec-2017

CLUSTER A6- GROUND FLOOR & FIRST FLOOR TELEPHONE AND


0035.4 KHEP-SD-EL-0035-04 18-Jan-2018
DATA LAYOUT SYSTEM LAYOUT

CLUSTER B2- GROUND FLOOR LIGHTING SYSTEM LAYOUT


0036 KHEP-SD-EL-0036-00 CLUSTER B2- FIRST FLOOR LIGHTING SYSTEM LAYOUT 29-Apr-2017
CLUSTER B2- ROOF FLOOR LIGHTING SYSTEM LAYOUT

CLUSTER B2- GROUND FLOOR LIGHTING SYSTEM LAYOUT


0036.1 KHEP-SD-EL-0036-01 CLUSTER B2- FIRST FLOOR LIGHTING SYSTEM LAYOUT 25-May-2017
CLUSTER B2- ROOF FLOOR LIGHTING SYSTEM LAYOUT

CLUSTER B2- GROUND FLOOR, FIRST FLOOR & ROOF FLOOR


0036.2 KHEP-SD-EL-0036-02 LIGHTING SYSTEM LAYOUT 27-Jul-2017

CLUSTER B6- GROUND FLOOR LIGHTING SYSTEM LAYOUT


CLUSTER B6- FIRST FLOOR LIGHTING SYSTEM LAYOUT
0037 KHEP-SD-EL-0037-00 30-Apr-2017
CLUSTER B6- ROOF FLOOR LIGHTING SYSTEM LAYOUT

CLUSTER B6- GROUND FLOOR LIGHTING SYSTEM LAYOUT


CLUSTER B6- FIRST FLOOR LIGHTING SYSTEM LAYOUT
0037.1 KHEP-SD-EL-0037-01 25-May-2017
CLUSTER B6- ROOF FLOOR LIGHTING SYSTEM LAYOUT

CLUSTER B6- GROUND FLOOR, FIRST FLOOR & ROOF FLOOR


0037.2 KHEP-SD-EL-0037-02 LIGHTING SYSTEM LAYOUT 27-Jul-2017
CLUSTER B6- GROUND FLOOR POWER SYSTEM LAYOUT
CLUSTER B6- FIRST FLOOR POWER SYSTEM LAYOUT
0038 KHEP-SD-EL-0038-00 30-Apr-2017
CLUSTER B6- ROOF FLOOR POWER SYSTEM LAYOUT

CLUSTER B6- GROUND FLOOR POWER SYSTEM LAYOUT


0038.1 KHEP-SD-EL-0038-01 CLUSTER B6- FIRST FLOOR POWER SYSTEM LAYOUT 14-May-2017
CLUSTER B6- ROOF FLOOR POWER SYSTEM LAYOUT

CLUSTER B6- GROUND & FIRST FLOOR POWER SYSTEM LAYOUT


0038.2 KHEP-SD-EL-0038-02 16-Dec-2017

CLUSTER B6- GROUND FLOOR MECHANICAL POWER SYSTEM


LAYOUT
0039 KHEP-SD-EL-0039-00 CLUSTER B6- FIRST FLOOR MECHANICAL POWER SYSTEM LAYOUT 30-Apr-2017
CLUSTER B6- ROOF FLOOR MECHANICAL POWER SYSTEM LAYOUT

CLUSTER B6- GROUND FLOOR, FIRST FLOOR & ROOF FLOOR


0039.1 KHEP-SD-EL-0039-01 31-May-2017
MECHANICAL POWER SYSTEM LAYOUT

CLUSTER B6- GROUND FLOOR TELEPHONE AND DATA SYSTEM


LAYOUT
0040 KHEP-SD-EL-0040-00 30-Apr-2017
CLUSTER B6- FIRST FLOOR TELEPHONE AND DATA SYSTEM
LAYOUT
CLUSTER B6- GROUND & First FLOOR TELEPHONE AND DATA
0040.1 KHEP-SD-EL-0040-01 SYSTEM LAYOUT 12-Dec-2017
CLUSTER B6- GROUND & First FLOOR TELEPHONE AND DATA
0040.2 KHEP-SD-EL-0040-02 SYSTEM LAYOUT 18-Jan-2018

CLUSTER B6- PANELBOARD SCHEDULE FOR VILLA 1


0041 KHEP-SD-EL-0041-00 CLUSTER B6- PANELBOARD SCHEDULE FOR VILLA (2,3,4,5 ) 30-Apr-2017
CLUSTER B6- PANELBOARD SCHEDULE FOR VILLA 6
CLUSTER B6- PANELBOARD SCHEDULE FOR VILLA 1
0041.1 KHEP-SD-EL-0041-01 CLUSTER B6- PANELBOARD SCHEDULE FOR VILLA (2,3,4,5 ) 1-Nov-2017
CLUSTER B6- PANELBOARD SCHEDULE FOR VILLA 6

CLUSTER A6- GROUND FLOOR LIGHTING SYSTEM LAYOUT


0042 KHEP-SD-EL-0042-00 CLUSTER A6- FIRST FLOOR LIGHTING SYSTEM LAYOUT 30-Apr-2017
CLUSTER A6- ROOF FLOOR LIGHTING SYSTEM LAYOUT

CLUSTER A6- GROUND FLOOR LIGHTING SYSTEM LAYOUT


0042.1 KHEP-SD-EL-0042-01 CLUSTER A6- FIRST FLOOR LIGHTING SYSTEM LAYOUT 25-May-2017
CLUSTER A6- ROOF FLOOR LIGHTING SYSTEM LAYOUT

CLUSTER A6- GROUND FLOOR, FIRST FLOOR & ROOF FLOOR


0042.2 KHEP-SD-EL-0042-02 LIGHTING SYSTEM LAYOUT 27-Jul-2017

CLUSTER A6- GROUND FLOOR & ROOF FLOOR LIGHTING SYSTEM


0042.3 KHEP-SD-EL-0042-03 LAYOUT 18-Dec-2017

ANCILLIARY BUILDING - GROUND FLOOR & ROOF MECHANICAL


0043 KHEP-SD-EL-0043-00 9-Jul-2017
POWER SYSTEM LAYOUT

0044 KHEP-SD-EL-0044-00 ANCILLIARY BUILDING - GROUND FLOOR POWER SYSTEM LAYOUT 9-Jul-2017

ANCILLIARY BUILDING - GROUND FLOOR LIGHTING SYSTEM


0045 KHEP-SD-EL-0045-00 9-Jul-2017
LAYOUT

ANCILLIARY BUILDING - GROUND FLOOR EARTHING SYSTEM


0046 KHEP-SD-EL-0046-00 9-Jul-2017
LAYOUT

0047 KHEP-SD-EL-0047-00 ANCILLIARY BUILDING - GROUND FLOOR TEL-DATA LAYOUT 9-Jul-2017

0048 KHEP-SD-EL-0048-00 ANCILLARY BUILDING - PANEL BOARD SCHEDULE 9-Jul-2017


0048.1 KHEP-SD-EL-0048-01 ANCILLARY BUILDING - PANEL BOARD SCHEDULE 2-Aug-2017

0048.2 KHEP-SD-EL-0048-02 ANCILLARY BUILDING - PANEL BOARD SCHEDULE 10-Aug-2017

PUBLIC TOILET A- GROUND FLOOR MECHANICAL POWER SYSTEM


0049 KHEP-SD-EL-0049-00 19-Jul-2017
LAYOUT

0050 KHEP-SD-EL-0050-00 PUBLIC TOILET A- GROUND FLOOR POWER SYSTEM LAYOUT 19-Jul-2017

0051 KHEP-SD-EL-0051-00 PUBLIC TOILET A- GROUND FLOOR LIGHTING SYSTEM LAYOUT 19-Jul-2017

0052 KHEP-SD-EL-0052-00 PUBLIC TOILET A- GROUND FLOOR EARTHING SYSTEM LAYOUT 19-Jul-2017

0052.1 KHEP-SD-EL-0052-01 PUBLIC TOILET A- GROUND FLOOR EARTHING SYSTEM LAYOUT 1-Aug-2017

PUBLIC TOILET- GROUND FLOOR MECHANICAL POWER SYSTEM


0053 KHEP-SD-EL-0053-00 19-Jul-2017
LAYOUT

0054 KHEP-SD-EL-0054-00 PUBLIC TOILET- GROUND FLOOR POWER SYSTEM LAYOUT 19-Jul-2017

0055 KHEP-SD-EL-0055-00 PUBLIC TOILET- GROUND FLOOR LIGHTING SYSTEM LAYOUT 19-Jul-2017

PUBLIC TOILET- GROUND FLOOR EARTHING SYSTEM LAYOUT


0056 KHEP-SD-EL-0056-00 19-Jul-2017

PUBLIC TOILET- GROUND FLOOR EARTHING SYSTEM LAYOUT


0056.1 KHEP-SD-EL-0056-01 1-Aug-2017

PUBLIC TOILET- TELECOM EQUIPMENT ROOM- TEL-DATA LAYOUT


0057 KHEP-SD-EL-0057-00 19-Jul-2017

PUBLIC TOILET- TELECOM EQUIPMENT ROOM- TEL-DATA LAYOUT


0057.1 KHEP-SD-EL-0057-01 31-Jul-2017

PUBLIC TOILET- PANEL BOARD SCHEDULE FOR PUBLIC TOILET &


0058 KHEP-SD-EL-0058-00 19-Jul-2017
TELECOM ROOM
PUBLIC TOILET- PANEL BOARD SCHEDULE FOR PUBLIC TOILET &
0058.1 KHEP-SD-EL-0058-01 1-Aug-2017
TELECOM ROOM

0059 KHEP-SD-EL-0059-00 Cluster A4 Roof Floor Power System Layout 7-Sep-2017

0060 KHEP-SD-EL-0060-00 Cluster A6 Roof Floor Power System Layout 7-Sep-2017

0060.1 KHEP-SD-EL-0060-01 Cluster A6 Roof Floor Power System Layout 23-Oct-2017

0061 KHEP-SD-EL-0061-00 Cluster B4 Roof Floor Power System Layout 7-Sep-2017

0062 KHEP-SD-EL-0062-00 Cluster B6 Roof Floor Power System Layout 7-Sep-2017

0063 KHEP-SD-EL-0063-00 Cluster A4 First Floor Lighting System Layout 17-Sep-2017

0064 KHEP-SD-EL-0064-00 Cluster A6 First Floor Lighting System Layout 17-Sep-2017

Cluster B2 Ground Floor & First Floor Lighting System Layout


0065 KHEP-SD-EL-0065-00 17-Sep-2017

Cluster B4 Ground Floor & First Floor Lighting System Layout


0066 KHEP-SD-EL-0066-00 17-Sep-2017
Cluster B6 Ground Floor & First Floor Lighting System Layout
0067 KHEP-SD-EL-0067-00 17-Sep-2017

Cluster A6 First Floor Lighting System Layout


0068 KHEP-SD-EL-0068-00 14-Nov-2017
(As per KHEP-RFC-EL-0036-00)

Cluster B2 Ground Floor & First Floor Lighting System Layout


0069 KHEP-SD-EL-0069-00 14-Nov-2017
(As per KHEP-RFC-EL-0036-00)

CLUSTER B4- GROUND , FIRST & ROOF FLOOR MECHANICAL


0070 KHEP-SD-EL-0070-00 5-Dec-2017
POWER SYSTEM LAYOUT

CLUSTER B4- GROUND , FIRST & ROOF FLOOR MECHANICAL


0070.1 KHEP-SD-EL-0070-01 11-Jan-2018
POWER SYSTEM LAYOUT

CLUSTER B4 - GROUND , FIRST & ROOF FLOOR MECHANICAL


0070.2 KHEP-SD-EL-0070-02 31-Jan-2018
POWER SYSTEM LAYOUT

CLUSTER B4 - GROUND , FIRST & ROOF FLOOR MECHANICAL


0070.3 KHEP-SD-EL-0070-03 19-Feb-2018
POWER SYSTEM LAYOUT

0071 KHEP-SD-EL-0071-00 CLUSTER B4- GROUND & FIRST FLOOR POWER SYSTEM LAYOUT 5-Dec-2017

CLUSTER B6- GROUND , FIRST & ROOF FLOOR MECHANICAL


0072 KHEP-SD-EL-0072-00 13-Dec-2017
POWER SYSTEM LAYOUT

CLUSTER B6- GROUND , FIRST & ROOF FLOOR MECHANICAL


0072.1 KHEP-SD-EL-0072-01 14-Jan-2018
POWER SYSTEM LAYOUT

CLUSTER B6- GROUND FIRST & ROOF FLOOR MECHANICAL POWER


0072.2 KHEP-SD-EL-0072-02 6-Feb-2018
SYSTEM LAYOUT

Cluster A4 Ground Floor Earthing System layout


0073 KHEP-SD-EL-0073-00 13-Dec-2017
Cluster A4 Roof Floor Lighting Protection System Layout

Cluster A6 Ground Floor Earthing System layout


0074 KHEP-SD-EL-0074-00 13-Dec-2017
Cluster A6 Roof Floor Lighting Protection System Layout

Cluster B2 Ground Floor Earthing System layout


0075 KHEP-SD-EL-0075-00 13-Dec-2017
Cluster B2 Roof Floor Lighting Protection System Layout

Cluster B4 Ground Floor Earthing System layout


0076 KHEP-SD-EL-0076-00 13-Dec-2017
Cluster B4 Roof Floor Lighting Protection System Layout

Cluster B6 Ground Floor Earthing System layout


0077 KHEP-SD-EL-0077-00 13-Dec-2017
Cluster B6 Roof Floor Lighting Protection System Layout

Cluster A4 Ground Floor, First Floor & Roof Floor Lighting System
0078 KHEP-SD-EL-0078-00 18-Dec-2017
layout

Cluster A4 Ground Floor, First Floor & Roof Floor Mechanical Power
0079 KHEP-SD-EL-0079-00 18-Dec-2017
System Layout

Cluster A4 Ground Floor, First Floor & Roof Floor Mechanical Power
0079.1 KHEP-SD-EL-0079-01 16-Jan-2018
System Layout

Cluster A4 Ground Floor, First Floor & Roof Floor Mechanical Power
0079.2 KHEP-SD-EL-0079-02 7-Feb-2018
System Layout
B6 Ground Floor First Floor Fire Alarm System Layout & Fire Alarm
0080 KHEP-SD-EL-0080-00 28-Dec-2017
Single Line Diagram

Cluster A6 Ground Floor, First Floor & Roof Floor Mechanical Power
0081 KHEP-SD-EL-0081-00 11-Jan-2018
System Layout

Cluster A6 Ground Floor, First Floor & Roof Floor Mechanical Power
0081.1 KHEP-SD-EL-0081-01 6-Feb-2018
System Layout

Cluster B2 Ground Floor, First Floor & Roof Floor Mechanical Power
0082 KHEP-SD-EL-0082-00 11-Jan-2018
System Layout

Cluster B2 Ground Floor, First Floor & Roof Floor Mechanical Power
0082.1 KHEP-SD-EL-0082-01 31-Jan-2018
System Layout

Cluster B2 Ground Floor, First Floor & Roof Floor Mechanical Power
0082.2 KHEP-SD-EL-0082-02 19-Feb-2018
System Layout

0083 KHEP-SD-EL-0083-00 A4 Ground floor earthing system layout 22-Jan-2018

0083.1 KHEP-SD-EL-0083-01 A4 Ground floor earthing system layout 22-Feb-2018

0084 KHEP-SD-EL-0084-00 A6 Ground floor earthing system layout 22-Jan-2018

0084.1 KHEP-SD-EL-0084-01 A6 Ground floor earthing system layout 22-Feb-2018


0085 KHEP-SD-EL-0085-00 B2 Ground floor earthing system layout 22-Jan-2018
0085.1 KHEP-SD-EL-0085-01 B2 Ground floor earthing system layout 22-Feb-2018

0086 KHEP-SD-EL-0086-00 B4 Ground floor earthing system layout 22-Jan-2018

0086.1 KHEP-SD-EL-0086-01 B4 Ground floor earthing system layout 22-Feb-2018

0087 KHEP-SD-EL-0087-00 B6 Ground floor earthing system layout 22-Jan-2018

0088 KHEP-SD-EL-0087-01 B6 Ground floor earthing system layout 22-Feb-2018

LOW CURRENT (TELECOME)

0001 KHEP-SD-LC-0001-00 Drawing Index, Symbols & General Notes 2-Mar-2017


0001.1 KHEP-SD-LC-0001-01 Drawing Index, Symbols & General Notes 23-Mar-2017

0001.2 KHEP-SD-LC-0001-02 Drawing Index, Symbols & General Notes 17-Apr-2017

0001.3 KHEP-SD-LC-0001-03 Drawing Index, Symbols & General Notes 8-Jul-2017


0002 KHEP-SD-LC-0002-00 Telecom Network Plan 8-Mar-2017

0002.1 KHEP-SD-LC-0002-01 TELECOM NETWORK PLAN 1 to 20 9-Apr-2017

0002.2 KHEP-SD-LC-0002-02 TELECOM NETWORK PLAN 1 to 20 18-Jul-2017


0003 KHEP-SD-LC-0003-00 Cover Page,Telecom Network Partial Plan-1 to 12 30-Mar-2017

0003.1 KHEP-SD-LC-0003-01 Cover Page, Telecom Network Partial Plan-1 to 12 15-Jun-2017

0003.2 KHEP-SD-LC-0003-02 Telecom Network Plan & Telecom Network Partial Plan- 1 to 12 21-Dec-2017

0004 KHEP-SD-LC-0004-00 Telecom Fiber Optic Network Diagram 30-Mar-2017

0004.1 KHEP-SD-LC-0004-01 Telecom Fiber Optic Network Diagram 15-Jul-2017


0004.2 KHEP-SD-LC-0004-02 Telecom Fiber Optic Network Diagram 27-Jul-2017

0005 KHEP-SD-LC-0005-00 CCTV System Network Plan 30-Mar-2017

0006 KHEP-SD-LC-0006-00

HVAC

0001 KHEP-SD-HVAC-0001-00 B2 First Floor, Ground Floor, Roof Floor Ducting & Piping Layout 23-Feb-2017

0001.1 KHEP-SD-HVAC-0001-01 B2 First Floor, Ground Floor, Roof Floor Ducting Layout 23-Feb-2017

0001.2 KHEP-SD-HVAC-0001-02 B2 First Floor, Ground Floor, Roof Floor Ducting Layout 5-Jul-2017

0001.3 KHEP-SD-HVAC-0001-03 B2 First Floor, Ground Floor, Roof Floor Ducting Layout 15-Jul-2017

0001.4 KHEP-SD-HVAC-0001-04 B2 First Floor, Ground Floor, Roof Floor Ducting Layout 7-Aug-2017

0002 KHEP-SD-HVAC-0002-00 A6 Ground Floor Ducting Layout 27-Mar-2017

0002.1 KHEP-SD-HVAC-0002-01 A6 Ground Floor, First Floor Ducting Layout 20-Apr-2017

0002.2 KHEP-SD-HVAC-0002-02 A6 Ground Floor, First Floor Ducting Layout 5-Jul-2017

0002.3 KHEP-SD-HVAC-0002-03 A6 Ground Floor, First Floor Ducting Layout 7-Aug-2017

0003 KHEP-SD-HVAC-0003-00 A6 Villa type Ground Floor,FF & RF HVAC Piping. 24-Apr-2017

0003.1 KHEP-SD-HVAC-0003-01 A6 Villa type Ground Floor,FF & RF HVAC Piping. 10-Jun-2017

BC4 Villa type Ground Floor HVAC Ducting.


0004 KHEP-SD-HVAC-0004-00 BC4 Villa type First Floor HVAC Ducting. 25-Apr-2017
BC4 Villa type Roof Floor HVAC Ducting.

0004.1 KHEP-SD-HVAC-0004-01 BC4 Ground Floor, First Floor & Roof Floor Duct Work 30-May-2017

0004.2 KHEP-SD-HVAC-0004-02 BC4 Ground Floor, First Floor & Roof Floor Duct Work 5-Jul-2017

0004.3 KHEP-SD-HVAC-0004-03 BC4 Ground Floor, First Floor & Roof Floor Duct Work 15-Jul-2017

0004.4 KHEP-SD-HVAC-0004-04 BC4 Ground Floor, First Floor & Roof Floor Duct Work 7-Aug-2017
BC4 Villa type Ground Floor HVAC Piping.
0005 KHEP-SD-HVAC-0005-00 BC4 Villa type First Floor HVAC Piping. 25-Apr-2017
BC4 Villa type Roof Floor HVAC Piping.
BC4 Ground Floor HVAC Piping work
0005.1 KHEP-SD-HVAC-0005-01 BC4 First Floor HVAC Piping work 11-Jun-2017
BC4 Roof Floor HVAC Piping work
BC6 VILLA TYPE GROUND FLOOR DUCTING LAY OUT
0006 KHEP-SD-HVAC-0006-00 BC6 VILLA TYPE FIRST FLOOR DUCTING LAY OUT 1-May-2017
BC6 VILLA TYPE ROOF FLOOR DUCTING LAY OUT

0006.1 KHEP-SD-HVAC-0006-01 BC6 Ground Floor, First Floor & Roof Floor Duct Work 30-May-2017

0006.2 KHEP-SD-HVAC-0006-02 BC6 Ground Floor, First Floor & Roof Floor Duct Work 5-Jul-2017

0006.3 KHEP-SD-HVAC-0006-03 BC6 Ground Floor, First Floor & Roof Floor Duct Work 15-Jul-2017

0006.4 KHEP-SD-HVAC-0006-04 BC6 Ground Floor, First Floor & Roof Floor Duct Work 7-Aug-2017

BC6 VILLA TYPE GROUND FLOOR PIPING LAY OUT


0007 KHEP-SD-HVAC-0007-00 BC6 VILLA TYPE FIRST FLOOR PIPING LAY OUT 1-May-2017
BC6 VILLA TYPE ROOF FLOOR PIPING LAY OUT

BC6 VILLA TYPE GROUND FLOOR PIPING LAY OUT


0007.1 KHEP-SD-HVAC-0007-01 BC6 VILLA TYPE FIRST FLOOR PIPING LAY OUT 10-Jun-2017
BC6 VILLA TYPE ROOF FLOOR PIPING LAY OUT

0008 KHEP-SD-HVAC-0008-00 A6 Villa type Roof Floor ducting layout 1-May-2017

0008.1 KHEP-SD-HVAC-0008-01 A6 Villa type Roof Floor ducting layout 5-Jul-2017

0008.2 KHEP-SD-HVAC-0008-02 A6 Villa type Roof Floor ducting layout 7-Aug-2017

0009 KHEP-SD-HVAC-0009-00 A4 Ground Floor,FF& RF Ducting Lay Out 8-May-2017

0009.1 KHEP-SD-HVAC-0009-01 A4 Ground Floor, First Floor & Roof Floor Duct Work 31-May-2017

0009.2 KHEP-SD-HVAC-0009-02 A4 Ground Floor, First Floor & Roof Floor Duct Work 5-Jul-2017

0009.3 KHEP-SD-HVAC-0009-03 A4 Ground Floor, First Floor & Roof Floor Duct Work 15-Jul-2017

0009.4 KHEP-SD-HVAC-0009-04 A4 Ground Floor, First Floor & Roof Floor Duct Work 7-Aug-2017

0010 KHEP-SD-HVAC-0010-00 A4 HVAC Schematic Riser Diagram 20-May-2017

0011 KHEP-SD-HVAC-0011-00 A6 HVAC Schematic Riser Diagram 20-May-2017

0011.1 KHEP-SD-HVAC-0011-01 A6 HVAC Schematic Riser Diagram 3-Jun-2017


0012 KHEP-SD-HVAC-0012-00 B2 HVAC Schematic Riser Diagram 20-May-2017
0013 KHEP-SD-HVAC-0013-00 BC4 HVAC Schematic Riser Diagram 20-May-2017
0014 KHEP-SD-HVAC-0014-00 BC6 HVAC Schematic Riser Diagram 20-May-2017

0015 KHEP-SD-HVAC-0015-00 A4 Ground Floor, HVAC Piping 10-Jun-2017

0016 KHEP-SD-HVAC-0016-00 A4 Schematic Riser Diagram, HVAC Piping 10-Jun-2017

0017 KHEP-SD-HVAC-0017-00 BC6, Schematic Diagram, HVAC Piping work 10-Jun-2017


0018 KHEP-SD-HVAC-0018-00 A6, Schematic Diagram, HVAC Piping work 10-Jun-2017

0019 KHEP-SD-HVAC-0019-00 B2, Schematic Diagram, HVAC Piping work 11-Jun-2017

0020 KHEP-SD-HVAC-0020-00 BC4, Schematic Diagram, HVAC Piping work 11-Jun-2017

B2 Ground Floor HVAC Piping work


0021 KHEP-SD-HVAC-0021-00 B2 First Floor HVAC Piping work 11-Jun-2017
B2 Roof Floor HVAC Piping work

0022 KHEP-SD-HVAC-0022-00 HVAC Standard Details General for All Cluster 4-Dec-2017

0022.1 KHEP-SD-HVAC-0022-01 HVAC Standard Details General for All Cluster 3-Jan-2018

MECHANICAL
0001 KHEP-SD-ME-0001-00 B2 First Floor - Fire Protection Layout, Ground Floor - Fire protection 22-Feb-2017

0001.1 KHEP-SD-ME-0001-01 B2 First Floor - Fire Protection, Ground Floor - Fire protection 20-May-2017

0001.2 KHEP-SD-ME-0001-02 B2 First Floor - Fire Protection, Ground Floor - Fire protection 5-Aug-2017

B2 First Floor & Ground Floor Fire protection Layout & B2 Schematic
0001.3 KHEP-SD-ME-0001-03 23-Dec-2017
Riser Diagram For Fire Protection

0001.4 KHEP-SD-ME-0001-04 B2 First Floor & Ground Floor Fire protection Layout 3-Jan-2018

0002 KHEP-SD-ME-0002-00 B2 Ground Floor Builders Work 16-Mar-2017

0003 KHEP-SD-ME-0003-00 A6 Ground Floor Fire Protection 27-Mar-2017

0003.1 KHEP-SD-ME-0003-01 A6 Ground Floor Fire Protection 6-Aug-2017

A6 Ground Floor & First Floor Fire Protection


0003.2 KHEP-SD-ME-0003-02 1-Nov-2017
A6 Schematic Riser Diagram Fire Protection

A6 Ground Floor & First Floor Fire Protection


0003.3 KHEP-SD-ME-0003-03 23-Jan-2018
A6 Schematic Riser Diagram Fire Protection

0004 KHEP-SD-ME-0004-00 BC4 Ground Floor & First Floor Fire Protection Layout. 24-Apr-2017

0004.1 KHEP-SD-ME-0004-01 BC4 Ground Floor & First Floor Fire Protection Layout. 6-Aug-2017

BC4 Ground Floor & First Floor Fire Protection Layout & Riser
0004.2 KHEP-SD-ME-0004-02 13-Jan-2018
Diagram

0005 KHEP-SD-ME-0005-00 BC6 Ground Floor & First Floor Fire Protection Layout. 1-May-2017

0005.1 KHEP-SD-ME-0005-01 BC6 Ground Floor & First Floor Fire Protection Layout. 6-Aug-2017

BC6 Ground Floor & First Floor Fire Protection Layout & Riser
0005.2 KHEP-SD-ME-0005-02 13-Jan-2018
Diagram

0006 KHEP-SD-ME-0006-00 A4 Ground Floor & First Floor Fire Protection Layout. 7-May-2017

0006.1 KHEP-SD-ME-0006-01 A4 Ground Floor & First Floor Fire Protection Layout. 6-Aug-2017

0006.2 KHEP-SD-ME-0006-02 A4 Ground Floor & First Floor Fire Protection Layout. 23-Jan-2018

0007 KHEP-SD-ME-0007-00 B2 Ground Floor, FF & RF Builders Work 8-May-2017

0007.1 KHEP-SD-ME-0007-01 B2 Ground Floor, FF & RF Builders Work 27-Jan-2018


0008 KHEP-SD-ME-0008-00 A6 Ground Floor - Builders work 15-May-2017

0009 KHEP-SD-ME-0009-00 A6 First Floor & Roof Floor - Builders work 16-May-2017

0010 KHEP-SD-ME-0010-00 A4 Villa Type Ground Floor, First Floor & Roof Floor - Builders work 16-May-2017

0011 KHEP-SD-ME-0011-00 BC6 Villa Type Ground Floor, First Floor & Roof Floor - Builders work 17-May-2017

0011.1 KHEP-SD-ME-0011-01 BC6 Villa Type Ground Floor, First Floor & Roof Floor - Builders work 23-Jan-2018

0012 KHEP-SD-ME-0012-00 BC4 Villa Type Ground Floor, First Floor & Roof Floor - Builders work 17-May-2017

0012.1 KHEP-SD-ME-0012-01 BC4 Villa Type Ground Floor, First Floor & Roof Floor - Builders work 23-Jan-2018

0013 KHEP-SD-ME-0013-00 B2 Villa Type, Schematic riser Diagram, Fire Protection 18-May-2017

0013.1 KHEP-SD-ME-0013-01 B2 Villa Type, Schematic riser Diagram, Fire Protection 6-Aug-2017

0014 KHEP-SD-ME-0014-00 BC4 Villa Type, Schematic riser Diagram, Fire Protection 18-May-2017

0014.1 KHEP-SD-ME-0014-01 BC4 Villa Type, Schematic riser Diagram, Fire Protection 6-Aug-2017

0015 KHEP-SD-ME-0015-00 BC6 Villa Type, Schematic riser Diagram, Fire Protection 18-May-2017

0015.1 KHEP-SD-ME-0015-01 BC6 Villa Type, Schematic riser Diagram, Fire Protection 6-Aug-2017

0016 KHEP-SD-ME-0016-00 A4 Villa Type, Schematic riser Diagram, Fire Protection 18-May-2017

0016.1 KHEP-SD-ME-0016-01 A4 Villa Type, Schematic riser Diagram, Fire Protection 6-Aug-2017

0017 KHEP-SD-ME-0017-00 A6 Villa Type, Schematic riser Diagram, Fire Protection 18-May-2017

0017.1 KHEP-SD-ME-0017-01 A6 Villa Type, Schematic riser Diagram, Fire Protection 6-Aug-2017

0018 KHEP-SD-ME-0018-00 Fire Protection Standard Detail 6-Nov-2017

PLUMBING
0001 KHEP-SD-PL-0001-00 B2 Ground Floor, First Floor,Roof Floor - Drainage Layout 22-Feb-2017

0001.1 KHEP-SD-PL-0001-01 B2 Ground Floor, First Floor, Roof Floor - Drainage System 30-May-2017

0002 KHEP-SD-PL-0002-00 B2 1st Floor ,Ground Floor, Roof Floor - Water Supply Layout 22-Feb-2017

0002.1 KHEP-SD-PL-0002-01 B2 Ground Floor, First Floor, Roof Floor-Water Supply Layout 12-Mar-2017

0003 KHEP-SD-PL-0003-00 A6 Ground Floor Drainage System 27-Mar-2017

0004 KHEP-SD-PL-0004-00 A6 Ground Floor, First Floor, Roof Floor-Water Supply Layout 17-Apr-2017

0004.1 KHEP-SD-PL-0004-01 A6 Ground Floor, First Floor, Roof Floor-Water Supply Layout 23-May-2017

0005 KHEP-SD-PL-0005-00 BC4 Villa type Ground Floor,FF & RF Water Supply Piping 24-Apr-2017
0005.1 KHEP-SD-PL-0005-01 BC4 Ground Floor, First Floor & Roof Floor Water Supply 30-May-2017

0005.2 KHEP-SD-PL-0005-02 BC4 Ground Floor, First Floor & Roof Floor Water Supply 6-Jun-2017

0006 KHEP-SD-PL-0006-00 BC4 Villa type Ground Floor,FF & RF Drainage Piping 24-Apr-2017

0006.1 KHEP-SD-PL-0006-01 BC4 Type Ground Floor,FF & RF Drainage Layout 13-May-2017

BC6 VILLA TYPE GROUND FLOOR DRAINAGE SYSTEM


0007 KHEP-SD-PL-0007-00 BC6 VILLA TYPE FIRST FLOOR DRAINAGE SYSTEM 1-May-2017
BC6 VILLA TYPE ROOF FLOOR DRAINAGE SYSTEM

BC6 VILLA TYPE GROUND FLOOR, FIRST FLOOR & ROOF FLOOR
0007.1 KHEP-SD-PL-0007-01 31-May-2017
DRAINAGE SYSTEM

BC6 VILLA TYPE GROUND FLOOR WATER SYSTEM


0008 KHEP-SD-PL-0008-00 BC6 VILLA TYPE FIRST FLOOR WATER SYSTEM 1-May-2017
BC6 VILLA TYPE ROOF FLOOR WATER SYSTEM

BC6 VILLA TYPE GROUND FLOOR, FIRST FLOOR & ROOF FLOOR
0008 KHEP-SD-PL-0008-01 31-May-2017
WATER SYSTEM

0009 KHEP-SD-PL-0009-00 A6 VILLA TYPE ROOF FLOOR DRAINAGE SYSTEM 1-May-2017

0009.1 KHEP-SD-PL-0009-01 A6 ROOF FLOOR DRAINAGE SYSTEM 19-Jun-2017

A4 Villa Ground Floor Drainage System


0010 KHEP-SD-PL-0010-00 A4 Villa first Floor Drainage System 7-May-2017
A4 Villa Roof Floor Drainage System

0011 KHEP-SD-PL-0011-00 A4 Ground Floor,FF&RF Water Supply Layout 8-May-2017

0011.1 KHEP-SD-PL-0011-01 A4 Ground Floor , First Floor & Roof Floor Water Supply Layout 20-May-2017

0012 KHEP-SD-PL-0012-00 A4 Schematic Riser Diagram Water Supply 20-May-2017

0013 KHEP-SD-PL-0013-00 A6 Schematic Riser Diagram Water Supply 20-May-2017

0014 KHEP-SD-PL-0014-00 B2 Schematic Riser Diagram Water Supply 20-May-2017

0015 KHEP-SD-PL-0015-00 BC4 Schematic Riser Diagram Water Supply 20-May-2017

0016 KHEP-SD-PL-0016-00 BC6 Schematic Riser Diagram Water Supply 20-May-2017

0017 KHEP-SD-PL-0017-00 A4 Schematic Riser Diagram Drainage System 20-May-2017

0017.1 KHEP-SD-PL-0017-01 A4 Schematic Riser Diagram Drainage System 3-Jun-2017

0017.2 KHEP-SD-PL-0017-02 A4 Schematic Riser Diagram Drainage System 12-Jun-2017

0018 KHEP-SD-PL-0018-00 A6 Schematic Riser Diagram Drainage System 20-May-2017

0018.1 KHEP-SD-PL-0018-01 A6 Schematic Riser Diagram Drainage System 3-Jun-2017

0018.2 KHEP-SD-PL-0018-02 A6 Schematic Riser Diagram Drainage System 12-Jun-2017

0019 KHEP-SD-PL-0019-00 B2 Schematic Riser Diagram Drainage System 20-May-2017


0019.1 KHEP-SD-PL-0019-01 B2 Schematic Riser Diagram Drainage System 3-Jun-2017

0019.2 KHEP-SD-PL-0019-02 B2 Schematic Riser Diagram Drainage System 12-Jun-2017

0020 KHEP-SD-PL-0020-00 BC4 Schematic Riser Diagram Drainage System 20-May-2017

0020.1 KHEP-SD-PL-0020-01 BC4 Schematic Riser Diagram Drainage System 3-Jun-2017

0020.2 KHEP-SD-PL-0020-02 BC4 Schematic Riser Diagram Drainage System 12-Jun-2017

0021 KHEP-SD-PL-0021-00 BC6 Schematic Riser Diagram Drainage System 20-May-2017

0021.1 KHEP-SD-PL-0021-01 BC6 Schematic Riser Diagram Drainage System 3-Jun-2017

0021.2 KHEP-SD-PL-0021-02 BC6 Schematic Riser Diagram Drainage System 12-Jun-2017

PLUMBING STANDARD DETAILS, GENERAL FOR ALL CLUSTERS


0022 KHEP-SD-PL-0022-00 23-Oct-2017

PLUMBING STANDARD DETAILS, GENERAL FOR ALL CLUSTERS


0022.1 KHEP-SD-PL-0022-01 2-Dec-2017

PLUMBING STANDARD DETAILS, GENERAL FOR ALL CLUSTERS


0022.2 KHEP-SD-PL-0022-02 7-Jan-2018

STRUCTURAL
0001 KHEP-SD-ST-0001-00 B2 Foundation GA Plan, Section & Details 15-Feb-2017

0002 KHEP-SD-ST-0002-00 B2 SLAB on Grade GA Plan, Section & Details, etc. 19-Feb-2017

0002.1 KHEP-SD-ST-0002-01 B2 SLAB on Grade GA Plan, Section & Details, etc. 22-Mar-2017

Slab On Grade GA Plan


0002.2 KHEP-SD-ST-0002-02 7-May-2017
Slab On Grade GA Sections & Details

B2 Slab On Grade GA Plan Slab On Grade GA Sections & Details &


0002.3 KHEP-SD-ST-0002-03 20-Dec-2017
Reinforcement Plan S&D

A6 Ground Floor Beams Reinforcement, Sec. & Det. (Part 1, 2 & All
0003 KHEP-SD-ST-0003-00 19-Feb-2017
BBS )
A6 Ground Floor Beams Reinforcement, Sec. & Det. (Part 1, 2 & All
0003.1 KHEP-SD-ST-0003-01 22-Mar-2017
BBS )

A6 Ground Floor Beams Reinforcement, Sec. & Det.(Part 1,2,3,4 &


0003.2 KHEP-SD-ST-0003-02 12-Apr-2017
BBS )

B2 Ground Floor Beams Reinforcement, Sec. & Det. (Part 1, 2 & All
0004 KHEP-SD-ST-0004-00 26-Mar-2017
BBS )

B2 Ground Floor Beams Reinforcement, Sec. & Det. (Part 1, 2 & All
0004.1 KHEP-SD-ST-0004-01 2-Apr-2017
BBS )

0005 KHEP-SD-ST-0005-00 B2 First Floor GA Plan, Section & Details 11-Mar-2017


B2 FIRST FLOOR GA PLAN
B2 FIRST FLOOR GA, SECTIONS AND DETAILS
B2 FIRST FLOOR SLAB REINFORCEMENT PLAN HORIZONTAL BARS
B2 FIRST FLOOR SLAB REINFORCEMENT PLAN VERTICAL BARS,
SECTION AND DETAILS
B2 BBS FOR FIRST FLOOR SLAB REINFORCEMENT

Resubmit 25-04-2017 26-04-2017


0005.1 KHEP-SD-ST-0005-01
B2 FIRST FLOOR GA PLAN (30-04-2017-Resubmit after recall)
B2 FIRST FLOOR GA, SECTIONS AND DETAILS
B2 FIRST FLOOR SLAB REINFORCEMENT PLAN HORIZONTAL BARS
B2 FIRST FLOOR SLAB REINFORCEMENT PLAN VERTICAL BARS,
SECTION AND DETAILS
B2 FIRST FLOOR SLAB REINFORCEMENT ADDITIONAL BARS
B2 BBS FOR FIRST FLOOR SLAB REINFORCEMENT

B2 FIRST FLOOR GA PLAN


B2 FIRST FLOOR GA, SECTIONS AND DETAILS
B2 FIRST FLOOR SLAB REINFORCEMENT PLAN HORIZONTAL BARS
B2 FIRST FLOOR SLAB REINFORCEMENT PLAN VERTICAL BARS,
0005.2 KHEP-SD-ST-0005-02 SECTION AND DETAILS 16-Nov-2017
B2 BBS FOR FIRST FLOOR SLAB REINFORCEMENT

0006 KHEP-SD-ST-0006-00 A6 Foundation GA Plan, Section & Details 7-Feb-2017

0007 KHEP-SD-ST-0007-00 A6 Slab on Grade GA Plan, Section & Details 8-Feb-2017

A6 Slab on Grade GA Plan, Section & Details A6 Slab on Grade


0007.1 KHEP-SD-ST-0007-01 20-Dec-2017
Reinforcement Plan Section & Details

0008 KHEP-SD-ST-0008-00 A6 Concrete Wall General Arrangement Plan & Elevation 14-Mar-2017

0008.1 KHEP-SD-ST-0008-01 A6 Concrete Wall General Arrangement Plan & Elevation 13-Apr-2017

0008.2 KHEP-SD-ST-0008-02 A6 Concrete Wall General Arrangement Plan & Elevation 7-Jun-2017

0009 KHEP-SD-ST-0009-00 B2 Concrete Wall General Arrangement Plan & Elevation 14-Mar-2017

009.1 KHEP-SD-ST-0009-01 B2 Concrete Wall General Arrangement Plan & Elevation 8-Apr-2017

009.2 KHEP-SD-ST-0009-02 B2 Concrete Wall General Arrangement Plan & Elevation 12-Jun-2017

009.3 KHEP-SD-ST-0009-03 B2 Concrete Wall General Arrangement Plan & Elevation 23-Oct-2017

009.4 KHEP-SD-ST-0009-04 B2 Concrete Wall General Arrangement Plan & Elevation 8-Nov-2017

0010 KHEP-SD-ST-0010-00 A6 First Floor Beam Reinforcement Section and Details 21-Mar-2017

0010.1 KHEP-SD-ST-0010-01 A6 First Floor Beam Reinforcement Section and Details BBS 17-May-2017

0010.2 KHEP-SD-ST-0010-02 A6 First Floor Beam Reinforcement Section and Details BBS 4-Jun-2017

A6 First Floor Slab General Arrangement Plan, Section and Details,


0011 KHEP-SD-ST-0011-00 21-Mar-2017
etc
A6 First Floor Slab General Arrangement Plan, Section and Details,
0011.1 KHEP-SD-ST-0011-01 1-Jun-2017
etc

0012 KHEP-SD-ST-0012-00 B2 First Floor Beam Reinforcement Section and Details 22-Mar-2017

0012.1 KHEP-SD-ST-0012-01 B2 FIRST FLOOR BEAMS REINFORCEMENT,SECTIONS AND DETAILS 22-Apr-2017

0013 KHEP-SD-ST-0013-00 BC4 Foundation GA Plan Sections & Details BBS 01-Apr-2017

0013.1 KHEP-SD-ST-0013-01 BC4 Foundation GA Plan Sections & Details BBS 18-Apr-2017

0013.2 KHEP-SD-ST-0013-02 BC4 Foundation GA Plan Sections & Details BBS 24-Apr-2017

0014 KHEP-SD-ST-0014-00 BC6 Foundation GA Plan Sections & Details BBS 6-Apr-2017

0014 KHEP-SD-ST-0014-01 BC6 Foundation GA Plan Sections & Details BBS 19-Apr-2017

0015 KHEP-SD-ST-0015-00 A4 Foundation GA Plan Sections & Details BBS 6-Apr-2017

0015.1 KHEP-SD-ST-0015-01 A4 Foundation GA Plan Sections & Details BBS 20-Apr-2017

A4 FOUNDATION GA PLAN
A4 FOUNDATION GA SECTIONS & DETAILS
0015.2 KHEP-SD-ST-0015-02 A4 FOUNDATION REINFORCEMENT PLAN 10-May-2017
A4 FOUNDATION REINFORCEMENT SECTIONS & DETAILS
A4 BBS (FOOTINGS, COLUMNS & WALLS STARTER BARS)

BC4 Slab on Grade GA Plan Section,Reinforcement Plan Section


0016 KHEP-SD-ST-0016-00 25-Apr-2017
&Details

BC4 Slab on Grade GA Plan Section,Reinforcement Plan Section


0016.1 KHEP-SD-ST-0016-01 29-May-2017
&Details

BC4 Slab on Grade GA Plan Section, Reinforcement Plan Section &


0016.2 KHEP-SD-ST-0016-02 20-Jul-2017
Details

BC4 Slab on Grade GA Plan Section, Reinforcement Plan Section &


0016.3 KHEP-SD-ST-0016-03 25-Dec-2017
Details

A6 STAIRCASE GA PLAN & REINFORCEMENT PLAN, SECTION AND


0017 KHEP-SD-ST-0017-00 26-Apr-2017
DETAILS

A6 STAIRCASE GA PLAN & REINFORCEMENT PLAN, SECTION AND


0017.1 KHEP-SD-ST-0017-01 19-Jul-2017
DETAILS
BC4 Concrete Wall Reinforcement Plan, Elevation & BBS
0018 KHEP-SD-ST-0018-00 27-Apr-2017

BC4 CONCRETE WALL REINFORCEMENT PLAN AND ELEVATION &


0018.1 KHEP-SD-ST-0018-01 17-May-2017
BBS
BC4 CONCRETE WALL REINFORCEMENT PLAN AND ELEVATION &
0018.2 KHEP-SD-ST-0018-02 6-Jun-2017
BBS

0018.3 KHEP-SD-ST-0018-03 BC4 CONCRETE WALL REINFORCEMENT PLAN AND ELEVATION 25-Oct-2017

BC6 CONCRETE WALL REINFORCEMENT PLAN AND ELEVATION


0019 KHEP-SD-ST-0019-00 BC6 CONCRETE WALL BBS (G TO 1ST) 30-Apr-2017
BC6 CONCRETE WALL BBS (1ST TO ROOF)

BC6 CONCRETE WALL REINFORCEMENT PLAN AND ELEVATION


0019.1 KHEP-SD-ST-0019-01 BC6 CONCRETE WALL BBS (G TO 1ST) 13-Jun-2017
BC6 CONCRETE WALL BBS (1ST TO ROOF)

0019.2 KHEP-SD-ST-0019-02 BC6 CONCRETE WALL REINFORCEMENT PLAN AND ELEVATION 25-Oct-2017

BC4 ROOF FLOOR SLAB GA PLAN, SECTION & DETAILS


BC4 ROOF FLOOR SLAB HORIZONTAL BARS REINFORCEMENT PLAN,
SECTIONS & DETAILS
0020 KHEP-SD-ST-0020-00 10-May-2017
BC4 ROOF FLOOR SLAB VERTICAL BARS REINFORCEMENT PLAN
BC4 ROOF FLOOR SLAB ADDITIONAL BARS REINFORCEMENT PLAN
BC4 ROOF SLAB BBS

A4 ROOF FLOOR SLAB GA PLAN, SECTION & DETAILS


A4 ROOF FLOOR SLAB HORIZONTAL BARS REINFORCEMENT PLAN,
SECTIONS & DETAILS
0021 KHEP-SD-ST-0021-00 10-May-2017
A4 ROOF FLOOR SLAB VERTICAL BARS REINFORCEMENT PLAN
A4 ROOF FLOOR SLAB ADDITIONAL BARS REINFORCEMENT PLAN
A4 ROOF SLAB BBS

A4 ROOF FLOOR SLAB GA PLAN, SECTION & DETAILS


A4 ROOF FLOOR SLAB HORIZONTAL BARS REINFORCEMENT PLAN,
0021.1 KHEP-SD-ST-0021-01 SECTIONS & DETAILS 13-Feb-2018
A4 ROOF FLOOR SLAB VERTICAL BARS REINFORCEMENT PLAN
A4 ROOF FLOOR SLAB ADDITIONAL BARS REINFORCEMENT PLAN

A6 ROOF FLOOR SLAB GA PLAN, SECTION & DETAILS


A6 ROOF FLOOR SLAB REINFORCEMENT PLAN
(HORIZONTAL & VERTICAL BARS)
0022 KHEP-SD-ST-0022-00 11-May-2017
A6 ROOF FLOOR SLAB REINFORCEMENT PLAN
(ADDITIONAL BARS), SECTION & DETAILS
A6 ROOF SLAB BBS
A6 ROOF FLOOR SLAB GA PLAN, SECTION & DETAILS
A6 ROOF FLOOR SLAB REINFORCEMENT PLAN
0022.1 KHEP-SD-ST-0022-01 (HORIZONTAL & VERTICAL BARS) 28-Feb-2018
A6 ROOF FLOOR SLAB REINFORCEMENT PLAN
(ADDITIONAL BARS), SECTION & DETAILS
A4 CONCRETE WALL REINFORCEMENT PLAN AND ELEVATION
A4 CONCRETE WALL BBS (G TO 1ST)
0023 KHEP-SD-ST-0023-00 14-May-2017
A4 CONCRETE WALL BBS (1ST TO ROOF)

A4 CONCRETE WALL REINFORCEMENT PLAN AND ELEVATION


A4 CONCRETE WALL BBS (G TO 1ST)
0023.1 KHEP-SD-ST-0023-01 5-Jun-2017
A4 CONCRETE WALL BBS (1ST TO ROOF)
B2 ROOF FLOOR SLAB GA PLAN
B2 ROOF FLOOR SLAB GA SECTION & DETAILS
B2 ROOF FLOOR SLAB VERTICAL BARS REINFORCEMENT PLAN
B2 ROOF FLOOR SLAB HORIZONTAL BARS REINFORCEMENT PLAN,
0024 KHEP-SD-ST-0024-00 14-May-2017
SECTIONS & DETAILS
B2 ROOF FLOOR SLAB ADDITIONAL BARS REINFORCEMENT PLAN
B2 ROOF SLAB BBS

B2 ROOF FLOOR SLAB GA PLAN


B2 ROOF FLOOR SLAB GA SECTION & DETAILS
B2 ROOF FLOOR SLAB VERTICAL BARS REINFORCEMENT PLAN
B2 ROOF FLOOR SLAB HORIZONTAL BARS REINFORCEMENT PLAN,
0024.1 KHEP-SD-ST-0024-01 31-May-2017
SECTIONS & DETAILS
B2 ROOF FLOOR SLAB ADDITIONAL BARS REINFORCEMENT PLAN
B2 ROOF SLAB BBS

B2 ROOF FLOOR SLAB GA PLAN


B2 ROOF FLOOR SLAB GA SECTION & DETAILS
B2 ROOF FLOOR SLAB VERTICAL BARS REINFORCEMENT PLAN
B2 ROOF FLOOR SLAB HORIZONTAL BARS REINFORCEMENT PLAN,
0024.2 KHEP-SD-ST-0024-02 23-Oct-2017
SECTIONS & DETAILS
B2 ROOF FLOOR SLAB ADDITIONAL BARS REINFORCEMENT PLAN
B2 ROOF SLAB BBS

B2 ROOF FLOOR SLAB GA PLAN


B2 ROOF FLOOR SLAB GA SECTION & DETAILS
B2 ROOF FLOOR SLAB VERTICAL BARS REINFORCEMENT PLAN
B2 ROOF FLOOR SLAB HORIZONTAL BARS REINFORCEMENT PLAN,
0024.3 KHEP-SD-ST-0024-03 16-Nov-2017
SECTIONS & DETAILS
B2 ROOF FLOOR SLAB ADDITIONAL BARS REINFORCEMENT PLAN
B2 ROOF SLAB BBS

B2 ROOF FLOOR BEAMS REINFORCEMENT,


0025 KHEP-SD-ST-0025-00 SECTIONS AND DETAILS 15-May-2017
ALL ROOF FLOOR BEAMS BBS
B2 ROOF FLOOR BEAMS REINFORCEMENT,
0025.1 KHEP-SD-ST-0025-01 SECTIONS AND DETAILS 1-Jun-2017
B2 ROOF FLOOR BEAMS BBS
BC6 FIRST FLOOR BEAMS REINFORCEMENT,SECTIONS AND
0026 KHEP-SD-ST-0026-00 DETAILS 15-May-2017
ALL FIRST FLOOR BEAMS BBS

BC6 SLAB ON GRADE GA PLAN, REINFORCEMENT PLAN, SECTIONS


0027 KHEP-SD-ST-0027-00 24-May-2017
& DETAILS

BC6 SLAB ON GRADE GA PLAN, REINFORCEMENT PLAN, SECTIONS


0027.1 KHEP-SD-ST-0027-01 12-Jul-2017
& DETAILS

BC6 SLAB ON GRADE GA PLAN, REINFORCEMENT PLAN, SECTIONS


0027.2 KHEP-SD-ST-0027-02 25-Dec-2017
& DETAILS

BC6 STAIRCASE GA PLAN, REINFORCEMENT PLAN SECTION AND


0028 KHEP-SD-ST-0028-00 25-May-2017
DETAILS & BBS

BC6 STAIRCASE GA PLAN, REINFORCEMENT PLAN SECTION AND


0028.1 KHEP-SD-ST-0028-01 10-Jun-2017
DETAILS & BBS

BC4 STAIRCASE GA PLAN, REINFORCEMENT PLAN SECTION AND


0029 KHEP-SD-ST-0029-00 25-May-2017
DETAILS & BBS
BC4 STAIRCASE GA PLAN, REINFORCEMENT PLAN SECTION AND
0029.1 KHEP-SD-ST-0029-01 10-Jun-2017
DETAILS & BBS

A4 STAIRCASE GA PLAN, REINFORCEMENT PLAN SECTION AND


0030 KHEP-SD-ST-0030-00 25-May-2017
DETAILS & BBS

A4 SLAB ON GRADE GA PLAN, REINFORCEMENT PLAN SECTIONS &


0031 KHEP-SD-ST-0031-00 27-May-2017
DETAILS

A4 SLAB ON GRADE GA PLAN, REINFORCEMENT PLAN SECTIONS &


0031.1 KHEP-SD-ST-0031-01 20-Jun-2017
DETAILS

A4 SLAB ON GRADE GA PLAN, REINFORCEMENT PLAN SECTIONS &


0031.2 KHEP-SD-ST-0031-02 25-Dec-2017
DETAILS

BC4 GROUND FLOOR BEAM REINFORCEMENT,SECTIONS AND


0032 KHEP-SD-ST-0032-00 13-Jun-2017
DETAILS & BBS

A4 GROUND FLOOR BEAM REINFORCEMENT,SECTIONS AND


0033 KHEP-SD-ST-0033-00 13-Jun-2017
DETAILS & BBS

BC6 GROUND FLOOR BEAM REINFORCEMENT, SECTIONS AND


0034 KHEP-SD-ST-0034-00 19-Jun-2017
DETAILS

ANCILLARY BUILDING FOUNDATION GA PLAN, REINFORCEMENT


0035 KHEP-SD-ST-0035-00 29-Jun-2017
PLAN SECTIONS AND DETAILS & BBS

Public Toilet Foundation GA plan, Reinforcement Plan Sections and


0036 KHEP-SD-ST-0036-00 10-Jul-2017
Details & BBS

Public Toilet - A Foundation GA plan, Reinforcement Plan Sections


0037 KHEP-SD-ST-0037-00 11-Jul-2017
and Details & BBS

Public Toilet - A Foundation GA plan, Reinforcement Plan Sections


0037.1 KHEP-SD-ST-0037-01 4-Nov-2017
and Details & BBS

Public Toilet - A Foundation GA plan, Reinforcement Plan Sections


0037.2 KHEP-SD-ST-0037-02 23-Nov-2017
and Details & BBS

ANCILLARY BUILDING COLUMN REINFORCEMENT ELEVATION,


0038 KHEP-SD-ST-0038-00 11-Jul-2017
SECTIONS AND DETAILS & BBS

ANCILLARY BUILDING ROOF FLOOR GA PLAN, REINFORCEMENT


0039 KHEP-SD-ST-0039-00 13-Jul-2017
PLAN SECTIONS AND DETAILS

A6 ROOF FLOOR BEAMS REINFORCEMENT, SECTIONS AND DETAILS


0040 KHEP-SD-ST-0040-00 & BBS 16-Jul-2017

A6 ROOF FLOOR BEAMS REINFORCEMENT, SECTIONS AND DETAILS


0040.1 KHEP-SD-ST-0040-01 & BBS 30-Jul-2017

A6 ROOF FLOOR BEAMS REINFORCEMENT, SECTIONS AND DETAILS


0040.2 KHEP-SD-ST-0040-02 & BBS 20-Aug-2017

A6 ROOF FLOOR BEAMS REINFORCEMENT, SECTIONS AND DETAILS


0040.3 KHEP-SD-ST-0040-03 & BBS 29-Aug-2017
PUBLIC TOILET ROOF FLOOR GA PLAN, REINFORCEMENT SECTIONS
AND DETAILS & BBS
0041 KHEP-SD-ST-0041-00 17-Jul-2017

PUBLIC TOILET ROOF FLOOR BEAM REINFORCEMENT, SECTIONS


0042 KHEP-SD-ST-0042-00 17-Jul-2017
AND DETAILS & BBS

ANCILLARY BUILDING GROUND FLOOR SLAB GA PLAN,


REINFORCEMENT PLAN SECTIONS AND DETAILS
0043 KHEP-SD-ST-0043-00 19-Jul-2017

ANCILLARY BUILDING GROUND FLOOR BEAM REINFORCEMENT,


0044 KHEP-SD-ST-0044-00 19-Jul-2017
SECTIONS AND DETAILS

BC4 FIRST FLOOR SLAB GA, HORIZONTAL & VERTICAL BARS


0045 KHEP-SD-ST-0045-00 25-Jul-2017
REINFORCEMENT PLAN, SECTION & DETAILS & BBS

BC4 FIRST FLOOR SLAB GA, HORIZONTAL & VERTICAL BARS


0045.1 KHEP-SD-ST-0045-01 25-Sep-2017
REINFORCEMENT PLAN, SECTION & DETAILS & BBS

BC4 FIRST FLOOR SLAB GA, HORIZONTAL & VERTICAL BARS


0045.2 KHEP-SD-ST-0045-02 9-Oct-2017
REINFORCEMENT PLAN, SECTION & DETAILS & BBS

BC4 FIRST FLOOR BEAM REINFORCEMENT,SECTIONS AND DETAILS


0046 KHEP-SD-ST-0046-00 (PART 1 & 2) 25-Jul-2017

PUBLIC TOILET-A GROUND FLOOR SLAB GA PLAN, REINFORCEMENT


0047 KHEP-SD-ST-0047-00 25-Jul-2017
PLAN SECTIONS AND DETAILS

PUBLIC TOILET-A GROUND FLOOR BEAM REINFORCEMENT,


0048 KHEP-SD-ST-0048-00 25-Jul-2017
SECTIONS AND DETAILS & BBS

PUBLIC TOILET GROUND FLOOR SLAB GA PLAN, REINFORCEMENT


0049 KHEP-SD-ST-0049-00 26-Jul-2017
PLAN SECTIONS AND DETAILS

PUBLIC TOILET GROUND FLOOR BEAM REINFORCEMENT,


0050 KHEP-SD-ST-0050-00 26-Jul-2017
SECTIONS AND DETAILS

0051 KHEP-SD-ST-0051-00 BC6 FIRST FLOOR SLAB GA PLAN, SECTION & DETAILS 26-Jul-2017

0051.1 KHEP-SD-ST-0051-01 BC6 FIRST FLOOR SLAB GA PLAN, SECTION & DETAILS 18-Oct-2017

PUBLIC TOILET-A ROOF FLOOR GA PLAN, SECTIONS AND DETAILS


0052 KHEP-SD-ST-0052-00 26-Jul-2017

A4 FIRST FLOOR SLAB GA PLAN, REINFORCEMENT PLAN SECTIONS


0053 KHEP-SD-ST-0053-00 AND DETAILS 30-Jul-2017

A4 FIRST FLOOR SLAB GA PLAN, REINFORCEMENT PLAN SECTIONS


0053.1 KHEP-SD-ST-0053-01 AND DETAILS 8-Oct-2017
A4 FIRST FLOOR BEAM REINFORCEMENT, SECTION & DETAILS &
0054 KHEP-SD-ST-0054-00 BBS 5-Aug-2017

A4 FIRST FLOOR BEAM REINFORCEMENT, SECTION & DETAILS &


0054.1 KHEP-SD-ST-0054-01 18-Oct-2017
BBS

BC4 ROOF FLOOR BEAMS REINFORCEMENT, SECTIONS AND


0055 KHEP-SD-ST-0055-00 26-Sep-2017
DETAILS & BBS
BC4 ROOF FLOOR BEAMS REINFORCEMENT, SECTIONS AND
0055.1 KHEP-SD-ST-0055-01 5-Oct-2017
DETAILS & BBS

BC4 ROOF FLOOR BEAMS REINFORCEMENT, SECTIONS AND


0055.2 KHEP-SD-ST-0055-02 17-Jan-2018
DETAILS & BBS

BC4 ROOF FLOOR BEAMS REINFORCEMENT, SECTIONS AND


0055.3 KHEP-SD-ST-0055-03 19-Feb-2018
DETAILS

A4 ROOF FLOOR BEAMS REINFORCEMENT, SECTIONS AND DETAILS


0056 KHEP-SD-ST-0056-00 27-Sep-2017
& BBS

BC6 ROOF FLOOR BEAMS REINFORCEMENT, SECTIONS AND


0057 KHEP-SD-ST-0057-00 3-Oct-2017
DETAILS & BBS
BC6 ROOF FLOOR BEAMS REINFORCEMENT, SECTIONS AND
0057.1 KHEP-SD-ST-0057-01 1-Nov-2017
DETAILS & BBS
BC6 ROOF FLOOR SLAB GA PLAN, SECTION & DETAILS
BC6 ROOF FLOOR SLAB REINFORCEMENT PLAN
0058 KHEP-SD-ST-0058-00 (HORIZONTAL & VERTICAL BARS) 28-Feb-2018
BC6 ROOF FLOOR SLAB REINFORCEMENT PLAN
(ADDITIONAL BARS), SECTION & DETAILS

OTHER
0001 KHEP-SD-G-0001-00 A4 Ground Floor & First Floor Coordination Layout 19-Jul-2017

0001.1 KHEP-SD-G-0001-01 A4 Ground Floor & First Floor Coordination Layout 9-Aug-2017

0002 KHEP-SD-G-0002-00 A6 Ground Floor & First Floor Coordination Layout 19-Jul-2017

0002.1 KHEP-SD-G-0002-01 A6 Ground Floor & First Floor Coordination Layout 9-Aug-2017

0003 KHEP-SD-G-0003-00 B2 Ground Floor & First Floor Coordination Layout 19-Jul-2017

0003.1 KHEP-SD-G-0003-01 B2 Ground Floor & First Floor Coordination Layout 9-Aug-2017

0004 KHEP-SD-G-0004-00 BC4 Ground Floor & First Floor Coordination Layout 19-Jul-2017

0004.1 KHEP-SD-G-0004-01 BC4 Ground Floor & First Floor Coordination Layout 9-Aug-2017

0005 KHEP-SD-G-0005-00 BC6 Ground Floor & First Floor Coordination Layout 19-Jul-2017

0005.1 KHEP-SD-G-0005-01 BC6 Ground Floor & First Floor Coordination Layout 9-Aug-2017
A Approved

B Approved w/ Comments

C Revise & Resubmit

E Rejected
SUBMITTED FOR RESPONDED AS
DISCIPLINE DATE RESPONDED INTERNAL REFERRENCE NO
CODE STATUS CODE STATUS

KHEP-SD-AR-B2-PL-GF-001
Revise &
Architectural 1 Approval 6-Apr-2017 C Resubmit
KHEP-SD-AR-B2-PL-FF-002
KHEP-SD-AR-B2-PL-RF-003
KHEP-SD-AR-B2-PL-GF-001
Revise &
Architectural 1 Approval 23-May-2017 C Resubmit
KHEP-SD-AR-B2-PL-FF-002
KHEP-SD-AR-B2-PL-RF-003
KHEP-SD-AR-B2-PL-GF-001
Revise &
Architectural 1 Approval 11-Jun-2017 C Resubmit
KHEP-SD-AR-B2-PL-FF-002
KHEP-SD-AR-B2-PL-RF-003
KHEP-SD-AR-B2-PL-GF-001
Revise &
Architectural 1 Approval 12-Jul-2017 C Resubmit
KHEP-SD-AR-B2-PL-FF-002
KHEP-SD-AR-B2-PL-RF-003
Approved KHEP-SD-AR-B2-PL-GF-001
Architectural 1 Approval 26-Jul-2017 B w/ KHEP-SD-AR-B2-PL-FF-002
Comments KHEP-SD-AR-B2-PL-RF-003
KHEP-SD-AR-B2-PL-GF-001
Revise &
Architectural 1 Approval 2-Dec-2017 C Resubmit
KHEP-SD-AR-B2-PL-FF-002
KHEP-SD-AR-B2-PL-RF-003
KHEP-SD-AR-B2-PL-GF-001
Architectural 1 Approval KHEP-SD-AR-B2-PL-FF-002

Revise & KHEP-SD-AR-B2-ELEV-004


Architectural 1 Approval 6-Apr-2017 C Resubmit KHEP-SD-AR-B2-ELEV-005
Revise & KHEP-SD-AR-B2-ELEV-004
Architectural 1 Approval 23-May-2017 C Resubmit KHEP-SD-AR-B2-ELEV-005
Revise & KHEP-SD-AR-B2-ELEV-004
Architectural 1 Approval 12-Jul-2017 C Resubmit KHEP-SD-AR-B2-ELEV-005
Approved
KHEP-SD-AR-B2-ELEV-004
Architectural 1 Approval 26-Jul-2017 B w/
KHEP-SD-AR-B2-ELEV-005
Comments
KHEP-SD-AR-B2-ELEV-004
Architectural 1 Approval
KHEP-SD-AR-B2-ELEV-005
Revise & KHEP-SD-AR-B2-SEC-006
Architectural 1 Approval 8-Apr-2017 C Resubmit KHEP-SD-AR-B2-SEC-007
Revise & KHEP-SD-AR-B2-SEC-006
Architectural 1 Approval 30-May-2017 C Resubmit KHEP-SD-AR-B2-SEC-007
Revise & KHEP-SD-AR-B2-SEC-006
Architectural 1 Approval 29-Jul-2017 C Resubmit KHEP-SD-AR-B2-SEC-007
Revise & KHEP-SD-AR-B2-SEC-006
Architectural 1 Approval 15-Aug-2017 C Resubmit KHEP-SD-AR-B2-SEC-007

KHEP-SD-AR-B2-DET-GF-008
Revise & KHEP-SD-AR-B2-DET-FF-009
Architectural 1 Approval 6-Apr-2017 C Resubmit KHEP-SD-AR-B2-DET-FF-010
KHEP-SD-AR-B2-DET-011

KHEP-SD-AR-B2-DET-GF-008
Revise & KHEP-SD-AR-B2-DET-FF-009
Architectural 1 Approval 30-May-2017 C Resubmit KHEP-SD-AR-B2-DET-FF-010
KHEP-SD-AR-B2-DET-011
Revise &
Architectural 1 Approval 20-Sep-2017 C Resubmit
KHEP-SD-AR-B2-DET-GF-008

Revise & KHEP-SD-AR-B2-FFP-GF-012


Architectural 1 Approval 6-Apr-2017 C Resubmit KHEP-SD-AR-B2-FFP-FF-013
Revise & KHEP-SD-AR-B2-FFP-GF-012
Architectural 1 Approval 1-Jun-2017 C Resubmit KHEP-SD-AR-B2-FFP-FF-013
Approved
KHEP-SD-AR-B2-FFP-GF-012
Architectural 1 Approval 29-Nov-2017 B w/
KHEP-SD-AR-B2-FFP-FF-013
Comments
Revise & KHEP-SD-AR-B2-RCP-GF-014
Architectural 1 Approval 6-Apr-2017 C Resubmit KHEP-SD-AR-B2-RCP-FF-015
Revise & KHEP-SD-AR-B2-RCP-GF-014
Architectural 1 Approval 30-May-2017 C Resubmit KHEP-SD-AR-B2-RCP-FF-015
Revise & KHEP-SD-AR-B2-RCP-GF-014
Architectural 1 Approval 20-Aug-2017 C Resubmit KHEP-SD-AR-B2-RCP-FF-015
Revise & KHEP-SD-AR-B2-RCP-GF-014
Architectural 1 Approval 20-Jan-2018 C Resubmit KHEP-SD-AR-B2-RCP-FF-015
Revise & KHEP-SD-AR-B2-FUR-GF-016
Architectural 1 Approval 6-Apr-2017 C Resubmit KHEP-SD-AR-B2-FUR-FF-017
Approved
KHEP-SD-AR-B2-FUR-GF-016
Architectural 1 Approval 30-May-2017 B w/
KHEP-SD-AR-B2-FUR-FF-017
Comments
Revise & KHEP-SD-AR-B2-WF-GF-018
Architectural 1 Approval 6-Apr-2017 C Resubmit KHEP-SD-AR-B2-WF-FF-019
Revise & KHEP-SD-AR-B2-WF-GF-018
Architectural 1 Approval 30-May-2017 C Resubmit KHEP-SD-AR-B2-WF-FF-019
Approved
KHEP-SD-AR-B2-WF-GF-018
Architectural 1 Approval 20-Sep-2017 B w/
KHEP-SD-AR-B2-WF-FF-019
Comments
Revise & KHEP-SD-AR-B2-SP-GF-020
Architectural 1 Approval 17-Apr-2017 C Resubmit KHEP-SD-AR-B2-SP-FF-021
KHEP-SD-AR-B2-SP-GF-020
Architectural 1 Approval 22-May-2017 E Rejected
KHEP-SD-AR-B2-SP-FF-021
Revise & KHEP-SD-AR-B2-SP-GF-020
Architectural 1 Approval 8-Aug-2017 C Resubmit KHEP-SD-AR-B2-SP-FF-021
Approved
KHEP-SD-AR-B2-SP-GF-020
Architectural 1 Approval 16-Oct-2017 B w/
KHEP-SD-AR-B2-SP-FF-021
Comments
KHEP-SD-AR-A6-PL-GF-001
Revise &
Architectural 1 Approval 8-Apr-2017 C Resubmit
KHEP-SD-AR-A6-PL-FF-002
KHEP-SD-AR-A6-PL-RF-003
KHEP-SD-AR-A6-PL-GF-001
Revise &
Architectural 1 Approval 1-Jun-2017 C Resubmit
KHEP-SD-AR-A6-PL-FF-002
KHEP-SD-AR-A6-PL-RF-003
KHEP-SD-AR-A6-PL-GF-001
Revise &
Architectural 1 Approval 16-Jul-2017 C Resubmit
KHEP-SD-AR-A6-PL-FF-002
KHEP-SD-AR-A6-PL-RF-003
Approved KHEP-SD-AR-A6-PL-GF-001
Architectural 1 Approval 26-Jul-2017 B w/ KHEP-SD-AR-A6-PL-FF-002
Comments KHEP-SD-AR-A6-PL-RF-003
KHEP-SD-AR-A6-PL-GF-001
Revise &
Architectural 1 Approval 20-Dec-2017 C Resubmit
KHEP-SD-AR-A6-PL-FF-002
KHEP-SD-AR-A6-PL-RF-003
Revise & KHEP-SD-AR-A6-ELEV-004
Architectural 1 Approval 8-Apr-2017 C Resubmit KHEP-SD-AR-A6-ELEV-005
Revise & KHEP-SD-AR-A6-ELEV-004
Architectural 1 Approval 30-May-2017 C Resubmit KHEP-SD-AR-A6-ELEV-005
Revise & KHEP-SD-AR-A6-ELEV-004
Architectural 1 Approval 12-Jul-2017 C Resubmit KHEP-SD-AR-A6-ELEV-005
Approved
KHEP-SD-AR-A6-ELEV-004
Architectural 1 Approval 26-Jul-2017 B w/
KHEP-SD-AR-A6-ELEV-005
Comments
Revise & KHEP-SD-AR-A6-SEC-006
Architectural 1 Approval 8-Apr-2017 C Resubmit KHEP-SD-AR-A6-SEC-007
Revise & KHEP-SD-AR-A6-SEC-006
Architectural 1 Approval 30-May-2017 C Resubmit KHEP-SD-AR-A6-SEC-007
Revise & KHEP-SD-AR-A6-SEC-006
Architectural 1 Approval 29-Jul-2017 C Resubmit KHEP-SD-AR-A6-SEC-007
Revise & KHEP-SD-AR-A6-SEC-006
Architectural 1 Approval 29-Aug-2017 C Resubmit KHEP-SD-AR-A6-SEC-007
Revise &
Architectural 1 Approval 8-Apr-2017 C Resubmit
KHEP-SD-AR-A6-DET-008

Revise &
Architectural 1 Approval 30-May-2017 C Resubmit
KHEP-SD-AR-A6-DET-008

Revise &
Architectural 1 Approval 20-Sep-2017 C Resubmit
KHEP-SD-AR-A6-DET-008

Revise &
Architectural 1 Approval 12-Nov-2017 C Resubmit
KHEP-SD-AR-A6-DET-008
Revise &
Architectural 1 Approval 8-Apr-2017 C Resubmit
KHEP-SD-AR-A6-KD-009

Approved
Architectural 1 Approval 30-May-2017 B w/ KHEP-SD-AR-A6-KD-009
Comments
Revise & KHEP-SD-AR-A6-FFP-GF-010
Architectural 1 Approval 8-Apr-2017 C Resubmit KHEP-SD-AR-A6-FFP-FF-011
Revise & KHEP-SD-AR-A6-FFP-GF-010
Architectural 1 Approval 30-May-2017 C Resubmit KHEP-SD-AR-A6-FFP-FF-011
Approved
KHEP-SD-AR-A6-FFP-GF-010
Architectural 1 Approval 20-Dec-2017 B w/
KHEP-SD-AR-A6-FFP-FF-011
Comments
Revise & KHEP-SD-AR-A6-WF-GF-012
Architectural 1 Approval 8-Apr-2017 C Resubmit KHEP-SD-AR-A6-WF-FF-013
Revise & KHEP-SD-AR-A6-WF-GF-012
Architectural 1 Approval 30-May-2017 C Resubmit KHEP-SD-AR-A6-WF-FF-013
Approved
KHEP-SD-AR-A6-WF-GF-012
Architectural 1 Approval 20-Sep-2017 B w/
KHEP-SD-AR-A6-WF-FF-013
Comments
Revise & KHEP-SD-AR-A6-RCP-GF-014
Architectural 1 Approval 8-Apr-2017 C Resubmit KHEP-SD-AR-A6-RCP-FF-015
Revise & KHEP-SD-AR-A6-RCP-GF-014
Architectural 1 Approval 30-May-2017 C Resubmit KHEP-SD-AR-A6-RCP-FF-015
Revise & KHEP-SD-AR-A6-RCP-GF-014
Architectural 1 Approval 28-Aug-2017 C Resubmit KHEP-SD-AR-A6-RCP-FF-015
KHEP-SD-AR-A6-WAD-GF-016
Revise &
Architectural 1 Approval 8-Apr-2017 C Resubmit
KHEP-SD-AR-A6-WAD-FF-017
KHEP-SD-AR-A6-WAD-FF-018
KHEP-SD-AR-A6-WAD-GF-016
Revise &
Architectural 1 Approval 1-Jun-2017 C Resubmit
KHEP-SD-AR-A6-WAD-FF-017
KHEP-SD-AR-A6-WAD-FF-018
KHEP-SD-AR-A6-WAD-GF-016 (1-3)
KHEP-SD-AR-A6-WAD-GF-016 (2-3)
Approved KHEP-SD-AR-A6-WAD-GF-016 (3-3)
Architectural 1 Approval 20-Dec-2017 B w/ KHEP-SD-AR-A6-WAD-FF-017
Comments KHEP-SD-AR-A6-WAD-FF-018 (1-2)
KHEP-SD-AR-A6-WAD-FF-018 (2-2)

Revise & KHEP-SD-AR-A6-FUR-GF-019


Architectural 1 Approval 8-Apr-2017 C Resubmit KHEP-SD-AR-A6-FUR-GF-020
Approved
KHEP-SD-AR-A6-FUR-GF-019
Architectural 1 Approval 30-May-2017 B w/
KHEP-SD-AR-A6-FUR-GF-020
Comments
Revise & KHEP-SD-AR-A6-SP-GF-021
Architectural 1 Approval 17-Apr-2017 C Resubmit KHEP-SD-AR-A6-SP-GF-022
KHEP-SD-AR-A6-SP-GF-021
Architectural 1 Approval 22-May-2017 E Rejected
KHEP-SD-AR-A6-SP-GF-022
Revise & KHEP-SD-AR-A6-SP-GF-021
Architectural 1 Approval 8-Aug-2017 C Resubmit KHEP-SD-AR-A6-SP-GF-022
KHEP-SD-AR-A6-SP-GF-021
Architectural 1 Approval 19-Dec-2017 A Approved
KHEP-SD-AR-A6-SP-GF-022
KHEP-SD-AR-BC4-PL-GF-001
Revise & KHEP-SD-AR-BC4-PL-FF-002
Architectural 1 Approval 22-May-2017 C Resubmit KHEP-SD-AR-BC4-PL-RF-003

KHEP-SD-AR-BC4-PL-GF-001
Revise & KHEP-SD-AR-BC4-PL-FF-002
Architectural 1 Approval 11-Jun-2017 C Resubmit KHEP-SD-AR-BC4-PL-RF-003

KHEP-SD-AR-BC4-PL-GF-001
Revise & KHEP-SD-AR-BC4-PL-FF-002
Architectural 1 Approval 16-Jul-2017 C Resubmit KHEP-SD-AR-BC4-PL-RF-003

KHEP-SD-AR-BC4-PL-GF-001
Approved
KHEP-SD-AR-BC4-PL-FF-002
Architectural 1 Approval 26-Jul-2017 B w/
KHEP-SD-AR-BC4-PL-RF-003
Comments
KHEP-SD-AR-BC4-ELEV-004
Revise &
Architectural 1 Approval 4-Jun-2017 C Resubmit
KHEP-SD-AR-BC4-ELEV-005

KHEP-SD-AR-BC4-ELEV-004
Revise &
Architectural 1 Approval 12-Jul-2017 C Resubmit
KHEP-SD-AR-BC4-ELEV-005

Approved KHEP-SD-AR-BC4-ELEV-004
Architectural 1 Approval 26-Jul-2017 B w/ KHEP-SD-AR-BC4-ELEV-005
Comments
KHEP-SD-AR-BC4-SEC-006
Revise &
Architectural 1 Approval 22-May-2017 C Resubmit
KHEP-SD- AR-BC4-SEC-007

KHEP-SD-AR-BC4-SEC-006
Revise &
Architectural 1 Approval 29-Jul-2017 C Resubmit
KHEP-SD- AR-BC4-SEC-007

KHEP-SD-AR-BC4-SEC-006
Revise &
Architectural 1 Approval 29-Aug-2017 C Resubmit
KHEP-SD- AR-BC4-SEC-007

Revise &
Architectural 1 Approval 28-May-2017 C Resubmit
KHEP-SD-AR-BC4-DET-GF-008

Revise &
Architectural 1 Approval 20-Sep-2017 C Resubmit
KHEP-SD-AR-BC4-DET-GF-008

Architectural 1 Approval 28-May-2017 A Approved KHEP-SD-AR-BC4-KD-GF-009


KHEP-SD-AR-BC4-FFP-GF-010
Revise &
Architectural 1 Approval 28-May-2017 C Resubmit
KHEP-SD-AR-BC4-FFP-FF-011

Revise & KHEP-SD-AR-BC4-FFP-GF-010


Architectural 1 Approval 1-Jan-2018 C Resubmit KHEP-SD-AR-BC4-FFP-FF-011
Revise & KHEP-SD-AR-BC4-WF-GF-012
Architectural 1 Approval 28-May-2017 C Resubmit KHEP-SD-AR-BC4-WF-FF-013
Approved
KHEP-SD-AR-BC4-WF-GF-012
Architectural 1 Approval 20-Sep-2017 B w/
KHEP-SD-AR-BC4-WF-FF-013
Comments

Revise & KHEP-SD-AR-BC4-RCP-GF-014


Architectural 1 Approval 28-May-2017 C Resubmit KHEP-SD-AR-BC4-RCP-FF-015

Revise & KHEP-SD-AR-BC4-RCP-GF-014


Architectural 1 Approval 20-Aug-2017 C Resubmit KHEP-SD-AR-BC4-RCP-FF-015

KHEP-SD-AR-BC4-WAD-016
Revise &
Architectural 1 Approval 28-May-2017 C Resubmit
KHEP-SD-AR-BC4-WAD-017
KHEP-SD-AR-BC4-WAD-018
KHEP-SD-AR-BC4-WAD-016(1/2)
Revise & KHEP-SD-AR-BC4-WAD-016(2/2)
Architectural 1 Approval 1-Feb-2018 C Resubmit KHEP-SD-AR-BC4-WAD-017
KHEP-SD-AR-BC4-WAD-018
KHEP-SD-AR-BC4-FUR-GF-019
Architectural 1 Approval 28-May-2017 A Approved KHEP-SD-AR-BC4-FUR-FF-020

KHEP-SD-AR-BC4-SP-GF-021
Architectural 1 Approval 22-May-2017 E Rejected KHEP-SD-AR-BC4-SP-FF-022

KHEP-SD-AR-BC4-SP-GF-021
Revise &
Architectural 1 Approval 8-Aug-2017 C Resubmit
KHEP-SD-AR-BC4-SP-FF-022

KHEP-SD-AR-BC4-SP-GF-021
Architectural 1 Approval 5-Dec-2017 A Approved KHEP-SD-AR-BC4-SP-FF-022

KHEP-SD-AR-BC4-DS-023
Revise &
Architectural 1 Approval 22-May-2017 C Resubmit
KHEP-SD-AR-BC4-WS-024

KHEP-SD-AR-B2-DS-022
Revise &
Architectural 1 Approval 30-May-2017 C Resubmit
KHEP-SD-AR-B2-WS-023

KHEP-SD-AR-BC6-PL-GF-001
Revise & KHEP-SD-AR-BC6-PL-FF-002
Architectural 1 Approval 23-May-2017 C Resubmit KHEP-SD-AR-BC6-PL-RF-003
KHEP-SD-AR-BC6-PL-GF-001
Revise & KHEP-SD-AR-BC6-PL-FF-002
Architectural 1 Approval 16-Jul-2017 C Resubmit KHEP-SD-AR-BC6-PL-RF-003

KHEP-SD-AR-BC6-PL-GF-001
Approved
KHEP-SD-AR-BC6-PL-FF-002
Architectural 1 Approval 26-Jul-2017 B w/
KHEP-SD-AR-BC6-PL-RF-003
Comments

KHEP-SD-AR-BC6-ELEV-004
Revise &
Architectural 1 Approval 28-May-2017 C Resubmit
KHEP-SD-AR-BC6-ELEV-005

KHEP-SD-AR-BC6-ELEV-004
Revise &
Architectural 1 Approval 12-Jul-2017 C Resubmit
KHEP-SD-AR-BC6-ELEV-005

Approved KHEP-SD-AR-BC6-ELEV-004
Architectural 1 Approval 26-Jul-2017 B w/ KHEP-SD-AR-BC6-ELEV-005
Comments
KHEP-SD-AR-BC6-SEC-006
Revise &
Architectural 1 Approval 30-May-2017 C Resubmit
KHEP-SD- AR-BC6-SEC-007

KHEP-SD-AR-BC6-SEC-006
Revise &
Architectural 1 Approval 29-Jul-2017 C Resubmit
KHEP-SD- AR-BC6-SEC-007

KHEP-SD-AR-BC6-SEC-006
Revise &
Architectural 1 Approval 29-Aug-2017 C Resubmit
KHEP-SD- AR-BC6-SEC-007

Revise &
Architectural 1 Approval 30-May-2017 C Resubmit
KHEP-SD-AR-BC6-DET-GF-008

Revise &
Architectural 1 Approval 20-Sep-2017 C Resubmit
KHEP-SD-AR-BC6-DET-GF-008

Revise &
Architectural 1 Approval 30-May-2017 C Resubmit
KHEP-SD-AR-BC6-KD-GF-009

Revise &
Architectural 1 Approval 20-Sep-2017 C Resubmit
KHEP-SD-AR-BC6-KD-GF-009

Revise & KHEP-SD-AR-BC6-FFP-GF-010


Architectural 1 Approval 28-May-2017 C Resubmit KHEP-SD-AR-BC6-FFP-FF-011
Revise & KHEP-SD-AR-BC6-FFP-GF-010
Architectural 1 Approval 11-Feb-2018 C Resubmit KHEP-SD-AR-BC6-FFP-FF-011
KHEP-SD-AR-BC6-FFP-GF-010
Architectural 1 Approval
KHEP-SD-AR-BC6-FFP-FF-011
KHEP-SD-AR-BC6-WF-GF-012
Revise &
Architectural 1 Approval 30-May-2017 C Resubmit
KHEP-SD-AR-BC6-WF-FF-013

Approved KHEP-SD-AR-BC6-WF-GF-012
Architectural 1 Approval 20-Sep-2017 B w/ KHEP-SD-AR-BC6-WF-FF-013
Comments
KHEP-SD-AR-BC6-RCP-GF-014
Revise &
Architectural 1 Approval 30-May-2017 C Resubmit
KHEP-SD-AR-BC6-RCP-FF-015

KHEP-SD-AR-BC6-RCP-GF-014
Revise &
Architectural 1 Approval 28-Aug-2017 C Resubmit
KHEP-SD-AR-BC6-RCP-FF-015

KHEP-SD-AR-BC6-WAD-016
Revise & KHEP-SD-AR-BC6-WAD-017
Architectural 1 Approval 30-May-2017 C Resubmit KHEP-SD-AR-BC6-WAD-018

KHEP-SD-AR-BC6-WAD-016(1/2)
Revise & KHEP-SD-AR-BC6-WAD-016(2/2)
Architectural 1 Approval 1-Feb-2018 C Resubmit KHEP-SD-AR-BC6-WAD-017
KHEP-SD-AR-BC6-WAD-018
Approved
KHEP-SD-AR-BC6-FUR-GF-019
Architectural 1 Approval 30-May-2017 B w/
KHEP-SD-AR-BC6-FUR-FF-020
Comments
KHEP-SD-AR-BC6-SP-GF-021
Architectural 1 Approval 22-May-2017 E Rejected
KHEP-SD-AR-BC6-SP-FF-022
Revise & KHEP-SD-AR-BC6-SP-GF-021
Architectural 1 Approval 8-Aug-2017 C Resubmit KHEP-SD-AR-BC6-SP-FF-022
KHEP-SD-AR-BC6-SP-GF-021
Architectural 1 Approval 5-Dec-2017 A Approved
KHEP-SD-AR-BC6-SP-FF-022
Revise & KHEP-SD-AR-BC6-DS-023
Architectural 1 Approval 1-Jun-2017 C Resubmit KHEP-SD-AR-BC6-WS-024
KHEP-SD-AR-A4-PL-GF-001
Revise &
Architectural 1 Approval 28-May-2017 C Resubmit
KHEP-SD-AR-A4-PL-FF-002
KHEP-SD-AR-A4-PL-RF-003
KHEP-SD-AR-A4-PL-GF-001
Revise &
Architectural 1 Approval 11-Jun-2017 C Resubmit
KHEP-SD-AR-A4-PL-FF-002
KHEP-SD-AR-A4-PL-RF-003
KHEP-SD-AR-A4-PL-GF-001
Revise &
Architectural 1 Approval 12-Jul-2017 C Resubmit
KHEP-SD-AR-A4-PL-FF-002
KHEP-SD-AR-A4-PL-RF-003
Approved KHEP-SD-AR-A4-PL-GF-001
Architectural 1 Approval 20-Jul-2017 B w/ KHEP-SD-AR-A4-PL-FF-002
Comments KHEP-SD-AR-A4-PL-RF-003
Revise & KHEP-SD-AR-A4-ELEV-004
Architectural 1 Approval 30-May-2017 C Resubmit KHEP-SD-AR-A4-ELEV-005
Revise & KHEP-SD-AR-A4-ELEV-004
Architectural 1 Approval 12-Jul-2017 C Resubmit KHEP-SD-AR-A4-ELEV-005
Approved
KHEP-SD-AR-A4-ELEV-004
Architectural 1 Approval 20-Jul-2017 B w/
KHEP-SD-AR-A4-ELEV-005
Comments
Revise & KHEP-SD-AR-A4-SEC-006
Architectural 1 Approval 30-May-2017 C Resubmit KHEP-SD- AR-A4-SEC-007
Revise & KHEP-SD-AR-A4-SEC-006
Architectural 1 Approval 29-Jul-2017 C Resubmit KHEP-SD- AR-A4-SEC-007
Revise & KHEP-SD-AR-A4-SEC-006
Architectural 1 Approval 29-Aug-2017 C Resubmit KHEP-SD- AR-A4-SEC-007
Revise &
Architectural 1 Approval 30-May-2017 C Resubmit
KHEP-SD-AR-A4-DET-GF-008

Revise &
Architectural 1 Approval 20-Sep-2017 C Resubmit
KHEP-SD-AR-A4-DET-GF-008

Revise &
Architectural 1 Approval 30-May-2017 C Resubmit
KHEP-SD-AR-A4-KD-GF-009

Revise &
Architectural 1 Approval 20-Sep-2017 C Resubmit
KHEP-SD-AR-A4-KD-GF-009

Revise & KHEP-SD-AR-A4-FFP-GF-010


Architectural 1 Approval 28-May-2017 C Resubmit KHEP-SD-AR-A4-FFP-FF-011
Revise & KHEP-SD-AR-A4-WF-GF-012
Architectural 1 Approval 30-May-2017 C Resubmit KHEP-SD-AR-A4-WF-FF-013
Approved
KHEP-SD-AR-A4-WF-GF-012
Architectural 1 Approval 20-Sep-2017 B w/
KHEP-SD-AR-A4-WF-FF-013
Comments
Revise & KHEP-SD-AR-A4-RCP-GF-014
Architectural 1 Approval 30-May-2017 C Resubmit KHEP-SD-AR-A4-RCP-FF-015
Approved
KHEP-SD-AR-A4-RCP-GF-014
Architectural 1 Approval 28-Aug-2017 B w/
KHEP-SD-AR-A4-RCP-FF-015
Comments
KHEP-SD-AR-A4-WAD-GF-016
Revise &
Architectural 1 Approval 30-May-2017 C Resubmit
KHEP-SD-AR-A4-WAD-FF-017
KHEP-SD-AR-A4-WAD-FF-018
Approved
KHEP-SD-AR-A4-FUR-GF-019
Architectural 1 Approval 30-May-2017 B w/
KHEP-SD-AR-A4-FUR-FF-020
Comments
Revise & KHEP-SD-AR-A4-SP-GF-021
Architectural 1 Approval 22-May-2017 C Resubmit KHEP-SD-AR-A4-SP-FF-022
Revise & KHEP-SD-AR-A4-SP-GF-021
Architectural 1 Approval 8-Aug-2017 C Resubmit KHEP-SD-AR-A4-SP-FF-022
KHEP-SD-AR-A4-SP-GF-021
Architectural 1 Approval 5-Dec-2017 A Approved
KHEP-SD-AR-A4-SP-FF-022
Revise & KHEP-SD-AR-A4-DS-023
Architectural 1 Approval 30-May-2017 C Resubmit KHEP-SD-AR-A4-WS-024
KHEP-SD-AR-A6-DS-023
Revise &
Architectural 1 Approval 1-Jun-2017 C Resubmit
KHEP-SD-AR-A6-WS-024

Approved
Architectural 1 Approval 14-Jun-2017 B w/ KHEP-SD-AR-G-001
Comments
Revise &
Architectural 1 Approval 8-Jun-2017 C Resubmit
KHEP-SD-AR-G-002
Revise &
Architectural 1 Approval 29-Nov-2017 C Resubmit
KHEP-SD-AR-G-002

Revise &
Architectural 1 Approval 8-Jun-2017 C Resubmit
KHEP-SD-AR-G-003

Revise &
Architectural 1 Approval 8-Jun-2017 C Resubmit
KHEP-SD-AR-G-004

Approved
Architectural 1 Approval 8-Jun-2017 B w/ KHEP-SD-AR-G-005
Comments
Approved
Architectural 1 Approval 15-Jun-2017 B w/ KHEP-SD-AR-G-006
Comments
Approved
Architectural 1 Approval 16-Jul-2017 B w/ KHEP-SD-AR-G-006
Comments
KHEP-SD-AR-B2-PL-GF-001
Revise & KHEP-SD-AR-B2-PL-FF-002
Architectural 2 Informatiom 16-Jul-2017
Resubmit KHEP-SD-AR-B2-PL-RF-003

KHEP-SD-AR-B2-ELEV-004
Revise &
Architectural 2 Informatiom 16-Jul-2017 KHEP-SD-AR-B2-ELEV-005
Resubmit

Approved
Architectural 1 Approval 26-Jul-2017 B w/ KHEP-SD-AR-G-008
Comments
Approved
Architectural 1 Approval 26-Jul-2017 B w/ KHEP-SD-AR-G-009
Comments
Approved
Architectural 1 Approval 21-Sep-2017 B w/ KHEP-SD-AR-G-009
Comments
Revise &
Architectural 1 Approval 20-Sep-2017 C Resubmit
KHEP-SD-AR-B2-DET-011

Approved
Architectural 1 Approval 12-Nov-2017 B w/ KHEP-SD-AR-B2-DET-011
Comments
Approved
Architectural 1 Approval 20-Sep-2017 B w/ KHEP-SD-AR-G-010
Comments

Revise & KHEP-SD-AR-B2-PL-GF-012


Architectural 2 Information 28-Sep-2017 C Resubmit KHEP-SD-AR-B2-PL-FF-013

Revise & KHEP-SD-AR-B2-PL-GF-012


Architectural 2 Information 28-Sep-2017 C Resubmit KHEP-SD-AR-B2-PL-FF-013

KHEP-SD-AR-AB-PL-GF-001
Revise &
Architectural 1 Approval 12-Nov-2017 C Resubmit
KHEP-SD-AR-AB-PL-RF-002

Revise & KHEP-SD-AR-PT-PL-GF-001


Architectural 1 Approval 12-Nov-2017 C Resubmit KHEP-SD-AR-PT-PL-RF-002
Approved
Architectural 1 Approval 12-Nov-2017 B w/ KHEP-SD-AR-PT-FIX-GF-004
Comments
KHEP-SD-AR-PTA-PL-GF-001
Revise &
Architectural 1 Approval 12-Nov-2017 C Resubmit
KHEP-SD-AR-PTA-PL-RF-002

Approved
Architectural 1 Approval 12-Nov-2017 B w/ KHEP-SD-AR-PTA-FIX-GF-004
Comments
KHEP-SD-AR-B2-DET-GF-009
(SHEET 1 OF 2)
KHEP-SD-AR-B2- DET-GF-009
Revise &
Architectural 1 Approval 31-Oct-2017 C Resubmit
(SHEET 2 OF 2)
KHEP-SD-AR-B2- DET-FF-010
(KHEP-SD-AR-004-01)
KHEP-SD-AR-B2-DET-GF-009
(SHEET 1 OF 2)
Approved KHEP-SD-AR-B2- DET-GF-009
Architectural 1 Approval 20-Dec-2017 B w/ (SHEET 2 OF 2)
Comments KHEP-SD-AR-B2- DET-FF-010
(KHEP-SD-AR-004-01)

Approved KHEP-SD-AR-AB-ELEV-008
Architectural 1 Approval 30-Oct-2017 B w/ KHEP-SD-AR-AB-ELEV-009
Comments
Approved KHEP-SD-AR-PT-ELEV-014
Architectural 1 Approval 30-Oct-2017 B w/ KHEP-SD-AR-PT-ELEV-015
Comments
Approved KHEP-SD-AR-PTA-ELEV-014
Architectural 1 Approval 30-Oct-2017 B w/ KHEP-SD-AR-PTA-ELEV-015
Comments
Revise &
Architectural 1 Approval 29-Nov-2017 C Resubmit
KHEP-SD-AR-G-011

Approved
Architectural 1 Approval 11-Jan-2018 B w/ KHEP-SD-AR-G-013
Comments
Approved
Architectural 1 Approval 15-Jan-2018 B w/ KHEP-SD-AR-G-012
Comments
KHEP-SD-AR-G-014
KHEP-SD-AR-G-015
Revise &
Architectural 1 Approval 20-Jan-2018 C Resubmit
KHEP-SD-AR-G-016
KHEP-SD-AR-G-017
KHEP-SD-AR-G-018
Revise &
Architectural 1 Approval 11-Jan-2018 C Resubmit
KHEP-SD-AR-G-019

Approved
Architectural 1 Approval 11-Feb-2018 B w/ KHEP-SD-AR-G-019
Comments
Approved
Architectural 1 Approval 15-Jan-2018 B w/ KHEP-SD-AR-G-020
Comments
KHEP-SD-AR-G-021 (1 of 6)
KHEP-SD-AR-G-021 (2 of 6)
Approved
KHEP-SD-AR-G-021 (3 of 6)
Architectural 1 Approval 21-Jan-2018 B w/
KHEP-SD-AR-G-021 (4 of 6)
Comments
KHEP-SD-AR-G-021 (5 of 6)
KHEP-SD-AR-G-021 (6 of 6)
KHEP-SD-AR-G-021 (1 of 4)
Revise & KHEP-SD-AR-G-021 (2 of 4)
Architectural 1 Approval 15-Jan-2018 C Resubmit KHEP-SD-AR-G-021 (3 of 4)
KHEP-SD-AR-G-021 (4 of 4)
Revise & KHEP-SD-AR-G-023 (1 of 2)
Architectural 1 Approval 27-Jan-2018 C Resubmit KHEP-SD-AR-G-023 (2 of 2)
KHEP-SD-AR-G-023 (1 of 2)
Architectural 1 Approval 24-Feb-2018 A Approved
KHEP-SD-AR-G-023 (2 of 2)
KHEP-SD-AR-G-023 (1 of 4)
Approved
KHEP-SD-AR-G-023 (2 of 4)
Architectural 1 Approval 23-Jan-2018 B w/
KHEP-SD-AR-G-023 (3 of 4)
Comments
KHEP-SD-AR-G-023 (4 of 4)
Revise & KHEP-SD-AR-G-DET-001
Architectural 1 Approval 11-Feb-2018 C Resubmit KHEP-SD-AR-G-DET-002
KHEP-SD-AR-G-DET-001
Architectural 1 Approval
KHEP-SD-AR-G-DET-002
Revise &
Architectural 1 Approval 10-Feb-2018 C Resubmit
KHEP-SD-AR-G-025

Approved
Architectural 1 Approval 24-Feb-2018 B w/ KHEP-SD-AR-G-025
Comments
Approved
Architectural 1 Approval 24-Feb-2018 B w/ KHEP-SD-AR-G-026
Comments
Approved
KHEP-SD-AR-A4-PL-RF-003
Architectural 1 Approval 24-Feb-2018 B w/
(KHEP-SD-AR-0046-03)
Comments
Approved
KHEP-SD-AR-A6-PL-RF-003
Architectural 1 Approval 24-Feb-2018 B w/
(KHEP-SD-AR-0010-03)
Comments
Approved
KHEP-SD-AR-B2-PL-RF-003
Architectural 1 Approval 24-Feb-2018 B w/
(KHEP-SD-AR-0010-03)
Comments

Architectural 1 Approval KHEP-SD-AR--G-027

Revise &
Civil 1 Approval 30-Jan-2017 C Resubmit
KAUST-SHOP-DW-0001 to 0005

Approved
Civil 1 Approval 30-Jan-2017 B w/ 1356-Shop-Mobilizaiton-0001
Comments
1356-SHOP-C-SD-0001
1356-SHOP-C-SD-0002
Approved 1356-SHOP-C-SD-0003
Civil 1 Approval 30-Jan-2017 B w/ 1356-SHOP-C-SD-0004
Comments 1356-SHOP-C-SD-0005
1356-SHOP-C-SD-0006
1356-SHOP-C-SD-0007
Revise &
Civil 1 Approval 30-Jan-2017 C Resubmit
1356DF-SHOP-C-BM-0001

Approved
Civil 1 Approval 5-Mar-2017 B w/ 1356DF-SHOP-C-BM-0001-01
Comments
Revise &
Civil 1 Approval 6-Jun-2017 C Resubmit
KHEP-SD-CI-SS-GMD-001

Approved
Civil 1 Approval 13-Jun-2017 B w/ KHEP-SD-CI-SS-GMD-001
Comments
Civil 1 Approval 15-Oct-2017 A Approved KHEP-SD-CI-SS-GMD-001
Approved
Civil 2 Information 30-Jan-2017 B w/ 1356DF-SHOP-C-GE-0001
Comments
Approved
Civil 1 Approval 1-Mar-2017 B w/ 1356DF-SHOP-C-GE-0002
Comments

1356DF-SD-CI-SDS-L-001
1356DF-SD-CI-2SDS-L-002-013
1356DF-SD-CI-SDS-P-L07A
1356DF-SD-CI-SDS-P-L07B
1356DF-SD-CI-SDS-P-L010
1356DF-SD-CI-SDS-P-L011A
1356DF-SD-CI-SDS-P-L011B
1356DF-SD-CI-SDS-P-L012
Revise & 1356DF-SD-CI-SDS-P-L013A
Civil 1 Approval 11-Mar-2017 C Resubmit 1356DF-SD-CI-SDS-P-L013B
1356DF-SD-CI-SDS-P-L013C
1356DF-SD-CI-SDS-P-L014
1356DF-SD-CI-SDS-P-L015A
1356DF-SD-CI-SDS-P-L015B
1356DF-SD-CI-SDS-P-L015C
1356DF-SD-CI-SDS-P-L016
1356DF-SD-CI-SDS-P-L017
1356DF-SD-CI-SDS-MSC-001
KHEP-SD-CI-SD-L-001
KHEP-SD-CI-SD-L-002
KHEP-SD-CI-SD-L-003
KHEP-SD-CI-SD-L-004
KHEP-SD-CI-SD-L-005
KHEP-SD-CI-SD-L-006
Revise &
Civil 1 Approval 15-Apr-2017 C Resubmit
KHEP-SD-CI-SD-L-007
KHEP-SD-CI-SD-L-008
KHEP-SD-CI-SD-L-009
KHEP-SD-CI-SD-L-010
KHEP-SD-CI-SD-L-011
KHEP-SD-CI-SD-L-012
KHEP-SD-CI-SD-L-013

KHEP-SD-CI-SD-P-001
KHEP-SD-CI-SD-P-002
KHEP-SD-CI-SD-P-003
KHEP-SD-CI-SD-P-004
KHEP-SD-CI-SD-P-005
Approved
KHEP-SD-CI-SD-P-006
Civil 1 Approval 16-May-2017 B w/
KHEP-SD-CI-SD-P-007
Comments
KHEP-SD-CI-SD-P-008
KHEP-SD-CI-SD-P-009
KHEP-SD-CI-SD-P-010
KHEP-SD-CI-SD-P-011

KHEP-SD-CI-SD-P-001
KHEP-SD-CI-SD-P-002
KHEP-SD-CI-SD-P-003
KHEP-SD-CI-SD-P-004
Approved KHEP-SD-CI-SD-P-005
Civil 1 Approval 8-Jun-2017 B w/ KHEP-SD-CI-SD-P-006
Comments KHEP-SD-CI-SD-P-007
KHEP-SD-CI-SD-P-008
KHEP-SD-CI-SD-P-009
KHEP-SD-CI-SD-P-010
KHEP-SD-CI-SD-P-011

Civil 1 Approval 4-Mar-2017 Recalled 1356DF-SD-CI-GR-001- 013

1356DF-SD-CI-RB-001 1356DF-
Revise & SD-CI-RB-002 TO 007 1356DF-SD-CI-RB-
Civil 1 Approval 5-Mar-2017 C Resubmit 008 1356DF-SD-CI-RB-009

Approved
Civil 1 Approval 20-Mar-2017 B w/ KHEP-SD-CI-GR-001 to 013
Comments

KHEP-SD-CI-RD-L-001
KHEP -SD-CI-RD-L-002 TO 011
KHEP-SD-CI-RD-P-001 TO 004
KHEP-SD-CI-RD-P-005 TO 010
KHEP-SD-CI-RD-P-011 TO 012
KHEP-SD-CI-RD-P-013 TO 017
KHEP-SD-CI-RD-P-018
KHEP-SD-CI-RD-P-019
KHEP-SD-CI-RD-P-020
KHEP-SD-CI-RD-P-021
Revise & KHEP-SD-CI-RD-P-022
Civil 1 Approval 12-Mar-2017 C Resubmit KHEP-SD-CI-RD-P-023
KHEP-SD-CI-RD-P-024
KHEP-SD-CI-RD-P-025
KHEP-SD-CI-RD-P-026
KHEP-SD-CI-RD-P-027
KHEP-SD-CI-RD-P-028
KHEP-SD-CI-RD-P-029
KHEP-SD-CI-RD-P-030
KHEP-SD-CI-RD-P-031
KHEP-SD-CI-RD-P-032
KHEP-SD-CI-RD-L-001
KHEP -SD-CI-RD-L-002 TO 011
KHEP-SD-CI-RD-P-001 TO 004
KHEP-SD-CI-RD-P-005 TO 010
Approved KHEP-SD-CI-RD-P-011 TO 012
Civil 1 Approval 30-Mar-2017 B w/ KHEP-SD-CI-RD-P-013 TO 017
Comments KHEP-SD-CI-RD-P-018
KHEP-SD-CI-RD-P-019
KHEP-SD-CI-RD-P-020
KHEP-SD-CI-RD-P-021
KHEP-SD-CI-RD-
KHEP-SD-CI-RD-SEC-001 TO 35
Civil 1 Approval Recalled KHEP-SD-CI-RD-SEC-037 TO 64

KHEP-SD-CI-SS-L-001
Revise &
Civil 1 Approval 21-Mar-2017 C Resubmit
KHEP-SD-CI-SS-L-002 TO 009
KHEP-SD-CI-SS-P-001 TO 009
Approved
KHEP-SD-CI-SS-L-001
Civil 1 Approval 6-Apr-2017 B w/
KHEP-SD-CI-SS-L-002 TO 013
Comments

KHEP-SD-CI-SS-TBD-001
Revise &
Civil 1 Approval 23-Mar-2017 C Resubmit
KHEP-SD-CI-SS-MCD-002 KHEP-SD-CI-
SS-MDS-003 KHEP-SD-CI-SS-IC-004

Revise & KHEP-SD-CI-SS-MDS-003


Civil 1 Approval 9-Apr-2017 C Resubmit KHEP-SD-CI-SS-PS-005
Revise & KHEP-SD-CI-SS-MDS-003
Civil 1 Approval 15-Apr-2017 C Resubmit KHEP-SD-CI-SS-PS-005
KHEP-SD-CI-SS-TBD-001
Approved KHEP-SD-CI-SS-MCD-002
Civil 1 Approval 20-Apr-2017 B w/ KHEP-SD-CI-SS-MDS-003
Comments KHEP-SD-CI-SS-IC-004
KHEPSD-CI-SS-PS-005
Approved
Civil 1 Approval 27-Mar-2017 B w/ KHEP-SD-CI-RD-CS-001
Comments
Revise & KHEP-SD-CI-SD-MS-001
Civil 1 Approval 18-Apr-2017 C Resubmit KHEP-SD-CI-SD-PS-002
Approved
KHEP-SD-CI-SD-MS-001
Civil 1 Approval 2-May-2017 B w/
KHEP-SD-CI-SD-PS-002
Comments
Approved
KHEP-SD-CI-SD-MS-001
Civil 1 Approval 4-Jun-2017 B w/
KHEP-SD-CI-SD-PS-002
Comments
KHEP-SD-CI-PF-L-001
Revise & KHEP-SD-CI-PF-L-002
Civil 1 Approval 21-May-2017 C Resubmit TO
KHEP-SD-CI-PF-L-013
KHEP-SD-CI-PF-L-001
Revise & KHEP-SD-CI-PF-L-002
Civil 1 Approval 22-Jun-2017 C Resubmit TO
KHEP-SD-CI-PF-L-013
KHEP-SD-CI-PF-L-001
Approved
KHEP-SD-CI-PF-L-002
Civil 1 Approval 1-Nov-2017 B w/
TO
Comments
KHEP-SD-CI-PF-L-013
KHEP-SD-CI-PF-L-001
KHEP-SD-CI-PF-L-002
Civil 1 Approval 5-Dec-2017 A Approved
TO
KHEP-SD-CI-PF-L-013
KHEP-SD-CI-SS-P-001
KHEP-SD-CI-SS-P-002
KHEP-SD-CI-SS-P-003
KHEP-SD-CI-SS-P-004
Approved
KHEP-SD-CI-SS-P-005
Civil 1 Approval 2-May-2017 B w/
KHEP-SD-CI-SS-P-006
Comments
KHEP-SD-CI-SS-P-007
KHEP-SD-CI-SS-P-008
KHEP-SD-CI-SS-P-009
KHEP-SD-CI-SS-P-010
KHEP-SD-CI-SD-L-001
KHEP-SD-CI-SD-L-002
KHEP-SD-CI-SD-L-003
KHEP-SD-CI-SD-L-004
KHEP-SD-CI-SD-L-005
KHEP-SD-CI-SD-L-006
Approved KHEP-SD-CI-SD-L-007
Civil 1 Approval 2-May-2017 B w/ KHEP-SD-CI-SD-L-008
Comments KHEP-SD-CI-SD-L-009
KHEP-SD-CI-SD-L-0010
KHEP-SD-CI-SD-L-0011
KHEP-SD-CI-SD-L-0012
KHEP-SD-CI-SD-L-0013
RELATED TO
KHEP-SD-CI-0007-00

KHEP-SD-CI-SD-PMD-001
Revise & KHEP-SD-CI-SD-PMD-002
Civil 1 Approval 10-May-2017 C Resubmit KHEP-SD-CI-SD-TYP-007
KHEP-SD-CI-SD-MRD-008

KHEP-SD-CI-SD-PMD-001
Approved
KHEP-SD-CI-SD-PMD-002
Civil 1 Approval 23-May-2017 B w/
KHEP-SD-CI-SD-TYP-007
Comments
KHEP-SD-CI-SD-MRD-008

Approved
KHEP-SD-CI-SD-MD-003
Civil 1 Approval 10-May-2017 B w/
Comments

KHEP-SD-CI-SD-CBD-004
Revise &
Civil 1 Approval 11-May-2017 C Resubmit
KHEP-SD-CI-SD-CBD-005
KHEP-SD-CI-SD-SC-006

Approved KHEP-SD-CI-SD-CBD-004
Civil 1 Approval 17-May-2017 B w/ KHEP-SD-CI-SD-CBD-005
Comments KHEP-SD-CI-SD-SC-006

KHEP-SD-CI-IR-L-001
KHEP-SD-CI-IR-L-002
KHEP-SD-CI-IR-L-003
KHEP-SD-CI-IR-L-004
KHEP-SD-CI-IR-L-005
KHEP-SD-CI-IR-L-006
Revise &
Civil 1 Approval 30-May-2017 C Resubmit
KHEP-SD-CI-IR-L-007
KHEP-SD-CI-IR-L-008
KHEP-SD-CI-IR-L-009
KHEP-SD-CI-IR-L-010
KHEP-SD-CI-IR-L-011
KHEP-SD-CI-IR-L-012
KHEP-SD-CI-IR-L-013

KHEP-SD-CI-IR-L-001
KHEP-SD-CI-IR-L-002
KHEP-SD-CI-IR-L-003
KHEP-SD-CI-IR-L-004
KHEP-SD-CI-IR-L-005
KHEP-SD-CI-IR-L-006
Revise &
Civil 1 Approval 10-Aug-2017 C Resubmit
KHEP-SD-CI-IR-L-007
KHEP-SD-CI-IR-L-008
KHEP-SD-CI-IR-L-009
KHEP-SD-CI-IR-L-010
KHEP-SD-CI-IR-L-011
KHEP-SD-CI-IR-L-012
KHEP-SD-CI-IR-L-013
KHEP-SD-CI-IR-L-001
KHEP-SD-CI-IR-L-002
KHEP-SD-CI-IR-L-003
KHEP-SD-CI-IR-L-004
KHEP-SD-CI-IR-L-005
Approved KHEP-SD-CI-IR-L-006
Civil 1 Approval 29-Aug-2017 B w/ KHEP-SD-CI-IR-L-007
Comments KHEP-SD-CI-IR-L-008
KHEP-SD-CI-IR-L-009
KHEP-SD-CI-IR-L-010
KHEP-SD-CI-IR-L-011
KHEP-SD-CI-IR-L-012
KHEP-SD-CI-IR-L-013

KHEP-SD-CI-IR-L-001
KHEP-SD-CI-IR-L-002
KHEP-SD-CI-IR-L-003
KHEP-SD-CI-IR-L-004
KHEP-SD-CI-IR-L-005
Approved KHEP-SD-CI-IR-L-006
Civil 1 Approval 22-Nov-2017 B w/ KHEP-SD-CI-IR-L-007
Comments KHEP-SD-CI-IR-L-008
KHEP-SD-CI-IR-L-009
KHEP-SD-CI-IR-L-010
KHEP-SD-CI-IR-L-011
KHEP-SD-CI-IR-L-012
KHEP-SD-CI-IR-L-013
Revise &
Civil 1 Approval 20-May-2017 C Resubmit
KHEP-SD-CI-PF-VC-001

Approved
Civil 1 Approval 4-Jul-2017 B w/ KHEP-SD-CI-PF-VC-001
Comments
Approved
Civil 1 Approval 22-Jan-2018 B w/ KHEP-SD-CI-PF-VC-001
Comments
KHEP-SD-CI-SS-BD-001
Revise & KHEP-SD-CI-SS-BD-002
Civil 1 Approval 23-May-2017 C Resubmit KHEP-SD-CI-SS-BD-003

KHEP-SD-CI-SS-BD-001
Revise & KHEP-SD-CI-SS-BD-002
Civil 1 Approval 11-Jun-2017 C Resubmit KHEP-SD-CI-SS-BD-003

KHEP-SD-CI-SS-BD-001
Revise & KHEP-SD-CI-SS-BD-002
Civil 1 Approval 4-Jul-2017 C Resubmit KHEP-SD-CI-SS-BD-003

KHEP-SD-CI-SS-BD-001
KHEP-SD-CI-SS-BD-002
Civil 1 Approval 28-Aug-2017 A Approved
KHEP-SD-CI-SS-BD-003

KHEP-SD-CI-CU-L-001
KHEP-SD-CI-CU-L-002
Revise &
Civil 1 Approval 28-May-2017 C Resubmit
TO
KHEP-SD-CI-CU-L-013

KHEP-SD-CI-CU-L-001
KHEP-SD-CI-CU-L-002
Revise &
Civil 1 Approval 19-Sep-2017 C Resubmit
TO
KHEP-SD-CI-CU-L-013

Revise &
Civil 1 Approval 4-Jun-2017 C Resubmit
KHEP-SD-CI-RB-L-001

Revise &
Civil 1 Approval 12-Aug-2017 C Resubmit
KHEP-SD-CI-RB-L-001

Revise &
Civil 1 Approval 24-Aug-2017 C Resubmit
KHEP-SD-CI-RB-L-001

Civil 1 Approval 14-Sep-2017 A Approved KHEP-SD-CI-RB-L-001


KHEP-SD-CI-RD-SO-L-001
KHEP-SD-CI-RD-SO-L-002
Approved
TO
Civil 1 Approval 29-May-2017 B w/
KHEP-SD-CI-RD-SO-L-013
Comments
KHEP-SD-CI-RD-SOT-014

Revise &
Civil 1 Approval 8-Jun-2017 C Resubmit
KHEP-SD-CI-HTD-001

Civil 1 Approval 11-Jul-2017 A Approved KHEP-SD-CI-HTD-001

KHEP-SD-CI-PF-AVC-001
Revise &
Civil 1 Approval 4-Jul-2017 C Resubmit
KHEP-SD-CI-PF-WVC-002
KHEP-SD-CI-PF-TBD-003

KHEP-SD-CI-PF-AVC-001
Revise &
Civil 1 Approval 24-Aug-2017 B Resubmit
KHEP-SD-CI-PF-WVC-002
KHEP-SD-CI-PF-TBD-003

KHEP-SD-CI-PF-AVC-001
Revise &
Civil 1 Approval 15-Oct-2017 C Resubmit
KHEP-SD-CI-PF-WVC-002
KHEP-SD-CI-PF-TBD-003

KHEP-SD-CI-PF-AVC-001
Revise &
Civil 1 Approval 23-Oct-2017 B Resubmit
KHEP-SD-CI-PF-WVC-002
KHEP-SD-CI-PF-TBD-003

Revise &
Civil 1 Approval 13-Jun-2017 C Resubmit
KHEP-SD-CI-PF-FHD-001

Revise &
Civil 1 Approval 11-Jul-2017 C Resubmit
KHEP-SD-CI-PF-FHD-001

Approved
Civil 1 Approval 20-Aug-2017 B w/ KHEP-SD-CI-PF-FHD-001
Comments
Revise &
Civil 1 Approval 10-Jul-2017 C Resubmit
KHEP-SD-CI-SD-PSD-001

Civil 1 Approval 27-Jul-2017 A Approved KHEP-SD-CI-SD-PSD-001


Revise &
Civil 1 Approval 18-Jul-2017 C Resubmit
KHEP-SD-CI-SS-ICD-001

Revise &
Civil 1 Approval 29-Jul-2017 C Resubmit
KHEP-SD-CI-SS-ICD-001

Civil 1 Approval 10-Aug-2017 A Approved KHEP-SD-CI-SS-ICD-001


Revise &
Civil 1 Approval 31-Jul-2017 C Resubmit
KHEP-SD-CI-SD-OFD-001

Revise &
Civil 1 Approval 10-Aug-2017 C Resubmit
KHEP-SD-CI-SD-OFD-001

Approved
Civil 1 Approval 24-Oct-2017 B w/ KHEP-SD-CI-SD-OFD-001
Comments
KHEP-SD-LS-HL-001
KHEP-SD-LS-HL-002
Approved
TO
Civil 1 Approval 1-Aug-2017 B w/
KHEP-SD-LS-HL-013
Comments
KHEP-SD-LS-HLG-014

KHEP-SD-CI-CU-SEC-001
KHEP-SD-CI-CU-SEC-002
Revise &
Civil 1 Approval 19-Sep-2017 C Resubmit
KHEP-SD-CI-CU-SEC-003
KHEP-SD-CI-CU-SEC-004
KHEP-SD-CI-CU-SEC-005
KHEP-SD-CI-IR-TBD-001
Revise & KHEP-SD-CI-IR-AVC-002
Civil 1 Approval 7-Aug-2017 C Resubmit KHEP-SD-CI-IR-WVC-003
KHEP-SD-CI-IR-VC-004
KHEP-SD-CI-IR-TBD-001
Approved
KHEP-SD-CI-IR-AVC-002
Civil 1 Approval 16-Aug-2017 B w/
KHEP-SD-CI-IR-WVC-003
Comments
KHEP-SD-CI-IR-VC-004
KHEP-SD-CI-RD-S-001
Revise & KHEP-SD-CI-RD-S-002
Civil 1 Approval 13-Aug-2017 C Resubmit KHEP-SD-CI-RD-M-001
KHEP-SD-CI-RD-M-002 upto 013

Revise & KHEP-SD-CI-RD-S-001


Civil 1 Approval 14-Sep-2017 C Resubmit KHEP-SD-CI-RD-S-002

Revise & KHEP-SD-CI-RD-S-001


Civil 1 Approval 2-Oct-2017 C Resubmit KHEP-SD-CI-RD-S-002

Approved
KHEP-SD-CI-RD-S-001
Civil 1 Approval 15-Oct-2017 B w/
KHEP-SD-CI-RD-S-002
Comments
Approved
Civil 1 Approval 20-Aug-2017 B w/ KHEP-SD-CI-PF-HCD-001
Comments
Approved
Civil 1 Approval 24-Oct-2017 B w/ KHEP-SD-CI-PF-HCD-001
Comments

Revise &
Civil 1 Approval 12-Aug-2017 C Resubmit
KHEP-SD-CI-SD-MDT-001

Approved
Civil 1 Approval 16-Aug-2017 B w/ KHEP-SD-CI-SD-MDT-001
Comments
Revise &
Civil 1 Approval 14-Sep-2017 C Resubmit
KHEP-SD-CI-RD-S-003

Approved
Civil 1 Approval 19-Sep-2017 B w/ KHEP-SD-CI-RD-S-003
Comments
Revise &
Civil 1 Approval 7-Oct-2017 C Resubmit
KHEP-SD-CI-SD-CBSL-001

Revise &
Civil 1 Approval 16-Oct-2017 C Resubmit
KHEP-SD-CI-SD-CBSL-001

Civil 1 Approval 5-Nov-2017 A Approved KHEP-SD-CI-SD-CBSL-001

KHEP-SD-CI-SS-ICPL-001
Revise &
Civil 1 Approval 16-Oct-2017 C Resubmit
KHEP-SD-CI-SS-BDSL-002

Approved KHEP-SD-CI-SS-ICPL-001
Civil 1 Approval 30-Oct-2017 B w/ KHEP-SD-CI-SS-BDSL-002
Comments

Civil 1 Approval 23-Oct-2017 A Approved KHEP-SD-CI-RB3-L-001

Civil 1 Approval 30-Oct-2017 A Approved KHEP-SD-CI-PF-THBD-001

Civil 1 Approval 1-Nov-2017 A Approved KHEP-SD-CI-RB4-L-001

Civil 1 Approval 1-Nov-2017 A Approved KHEP-SD-CI-RB5-L-001

KHEP-SD-CI-IR-SCH-001
Revise &
Civil 1 Approval 22-Nov-2017 C Resubmit
KHEP-SD-CI-IR-CCD-002

Approved
Civil 1 Approval 16-Dec-2017 B w/ KHEP-SD-CI-IR-THBD-001
comments
KHEP-SD-CI-FG-L-001
KHEP-SD-CI-FG-L-002
Revise &
Civil 1 Approval 26-Dec-2017 C Resubmit
TO
KHEP-SD-CI-FG-L-013
KHEP-SD-CI-FG-L-001
KHEP-SD-CI-FG-L-002
Revise &
Civil 1 Approval 9-Jan-2018 C Resubmit
TO
KHEP-SD-CI-FG-L-013

Revise &
Civil 1 Approval 21-Dec-2017 C Resubmit
KHEP-SD-CI-RD-BC-001

Revise &
Civil 1 Approval 4-Jan-2018 C Resubmit
KHEP-SD-CI-RD-BC-001

Revise &
Civil 1 Approval 31-Jan-2018 C Resubmit
KHEP-SD-CI-RD-BC-001

Revise &
Civil 1 Approval 4-Jan-2018 C Resubmit
KHEP-SD-CI-RD-INT-001

KHEP-SD-CI-ABPT-L-001
Revise &
Civil 1 Approval 27-Jan-2018 C Resubmit
KHEP-SD-CI-PT-L-002
KHEP-SD-CI-PT-L-003

KHEP-SD-CI-ABPT-L-001
Civil 1 Approval 31-Jan-2018 A Approved KHEP-SD-CI-PT-L-002
KHEP-SD-CI-PT-L-003

KHEP-SD-CI-DL-001
KHEP-SD-CI-DL-002
Civil 1 Approval
to
KHEP-SD-CI-DL-01

1356DF-SD-EL- FA-B2-GF-001
1356DF-SD-EL-FA-B2-FF-002
1356DF-SD-EL-LT-B2-GF-001
1356DF-SD-EL-LT-B2-FF-002
Revise &
Electrical 1 Approval 4-Mar-2017 C Resubmit
1356DF-SD-EL-LT-B2-RF-003
1356DF-SD-EL-EP-B2-GF-001
1356DF-SD-EL-EP-B2-FF-002
1356DF-SD-EL-EP-B2-RF-003
1356DF-SD-EL-ER-B2-GF-001

KHEP-SD-EL- B2-FA- GF-001


KHEP-SD-EL- B2-FA- FF-002
KHEP-SD-EL- B2-LT- GF-001
KHEP-SD-EL- B2-LT- FF-002
Revise &
Electrical 1 Approval 18-Mar-2017 C Resubmit
KHEP-SD-EL- B2-LT- RF-003
KHEP-SD-EL- B2-EP- GF-001
KHEP-SD-EL- B2-EP- FF-002
KHEP-SD-EL- B2-EP- RF-003
KHEP-SD-EL- B2-ER- RF-001
Revise & SD-EL-B2-FA-FF-002
Electrical 1 Approval 6-Apr-2017 C Resubmit SD-EL- B2-FA-GF-001
SD-EL-B2-FA-FF-002
Revise &
Electrical 1 Approval 3-Jan-2018 C Resubmit
SD-EL- B2-FA-GF-001
SD-EL- B2-FA-SL-001
KHEP-SD-EL-A6-FA-GF-001
KHEP-SD-EL-A6-FA-FF-002
Revise &
Electrical 1 Approval 11-Feb-2018 C Resubmit
KHEP-SD-EL-A6-FA-SL-001
KHEP-SD-EL-A6-FA-G-002
KHEP-SD-EL-A6-FA-G-003
Revise & 1356DF-SD-EL- TE-B2-GF-001
Electrical 1 Approval 4-Mar-2017 C Resubmit 1356DF-SD-EL- TE-B2-FF-002
Approved
1356DF-SD-EL- TE-B2-GF-001
Electrical 1 Approval 6-Apr-2017 B w/
1356DF-SD-EL- TE-B2-FF-002
comments
Revise & 1356DF-SD-EL- TE-B2-GF-001
Electrical 1 Approval 14-Nov-2017 C Resubmit 1356DF-SD-EL- TE-B2-FF-002
Revise & 1356DF-SD-EL- TE-B2-GF-001
Electrical 1 Approval 2-Jan-2018 C Resubmit 1356DF-SD-EL- TE-B2-FF-002
1356DF-SD-EL- TE-B2-GF-001
Electrical 1 Approval 24-Jan-2018 A Approved
1356DF-SD-EL- TE-B2-FF-002
1356DF-SD-EL-PM-B2-GF-001
Revise &
Electrical 1 Approval 4-Mar-2017 C Resubmit
1356DF-SD-EL-PM-B2-FF-002
1356DF-SD-EL- PM-B2-RF-003
Approved KHEP-SD-EL- B2-PM- GF-001
Electrical 1 Approval 18-Mar-2017 B w/ KHEP-SD-EL- B2-PM- FF-002
comments KHEP-SD-EL- B2-PM- RF-003
KHEP-SD-EL- B2-PM- GF-001
Electrical 1 Approval 1-Jun-2017 A Approved KHEP-SD-EL- B2-PM- FF-002
KHEP-SD-EL- B2-PM- RF-003
KHEP-SD-EL- B2-PM- GF-001
Electrical 1 Approval 24-Oct-2017 A Approved KHEP-SD-EL- B2-PM- FF-002
KHEP-SD-EL- B2-PM- RF-003

1356DF-SD-E-EG-051
1356DF-SD-E-EG-052
1356DF-SD-E-EG-801
1356DF-SD-E-EG-802
1356DF-SD-E-EG-803 1356DF-
SD-E-EG-804 1356DF-SD-E-LL-
Revise & 400 1356DF-SD-E-LS-
Electrical 1 Approval 18-Mar-2017 C Resubmit 500 1356DF-SD-E-MV-
200 1356DF-SD-E-LV-300
1356DF-SD-E-PS-501
1356DF-SD-E-PS-502
1356DF-SD-E-PS-503 1356DF-
SD-E-PS-504 1356DF-SD-E-
PS-505 1356DF-SD-T-TY-100

KHEP-SD-EL-MV-SLD-051
KHEP-SD-EL-MV-SLD-052
KHEP-SD-EL-ID-801
KHEP-SD-EL-ID-802
KHEP-SD-EL-ID-803
KHEP-SD-EL-ID-804
Revise &
Electrical 1 Approval 8-Apr-2017 C Resubmit
KHEP-SD-EL-PS-501
KHEP-SD-EL-PS-502
KHEP-SD-EL-PS-503
KHEP-SD-EL-PS-504
KHEP-SD-EL-PS-505
KHEP-SD-LC-CC-CO-100

KHEP-SD-EL-MV-SLD-051
KHEP-SD-EL-MV-SLD-052
KHEP-SD-EL-ID-801
KHEP-SD-EL-ID-802
KHEP-SD-EL-ID-803
KHEP-SD-EL-ID-804
Electrical 1 Approval 20-Apr-2017 A Approved
KHEP-SD-EL-PS-501
KHEP-SD-EL-PS-502
KHEP-SD-EL-PS-503
KHEP-SD-EL-PS-504
KHEP-SD-EL-PS-505
KHEP-SD-LC-CC-CO-100
Approved KHEP-SD-EL-A6-ER-GF-001
Electrical 1 Approval 18-Mar-2017 B w/ KHEP-SD-EL-B4-ER-GF-001
comments KHEP-SD-EL-B6-ER-GF-001
Revise &
Electrical 1 Approval 21-Mar-2017 C Resubmit
KHEP-SD-EL-CC-CO-100

Electrical 1 Approval 4-Apr-2017 A Approved KHEP-SD-EL-CC-CO-100


Revise & KHEP-SD-EL-B2-PS-TB1 KHEP-
Electrical 1 Approval 21-Mar-2017 C Resubmit SD-EL-B2-PS-TB2
Revise & KHEP-SD-EL-B2-PS-TB1 KHEP-
Electrical 1 Approval 6-Apr-2017 C Resubmit SD-EL-B2-PS-TB2
KHEP-SD-EL-B2-PS-TB1
Electrical 1 Approval 29-Apr-2017 A Approved
KHEP-SD-EL-B2-PS-TB2
Approved
KHEP-SD-EL-B2-PS-TB1
Electrical 1 Approval 24-Oct-2017 B w/
KHEP-SD-EL-B2-PS-TB2
comments
KHEP-SD-EL-B2-PS-TB1
Electrical 1 Approval 8-Nov-2017 A Approved
KHEP-SD-EL-B2-PS-TB2
KHEP-SD-EL-A6-EP-GF-001
KHEP-SD-EL-A6-EP-FF-002
KHEP-SD-EL-A6-EP-RF-003
Revise & KHEP-SD-EL-A6-TE-GF-001
Electrical 1 Approval 26-Mar-2017 C Resubmit KHEP-SD-EL-A6-TE-FF-002
KHEP-SD-EL-A6-LT-GF-001
KHEP-SD-EL-A6-FF-002
KHEP-SD-EL-A6-LT-GF-003
KHEP-SD-EL-A6-EP-GF-001
Revise &
Electrical 1 Approval 4-May-2017 C Resubmit
KHEP-SD-EL-A6-EP-FF-002
KHEP-SD-EL-A6-EP-RF-003
KHEP-SD-EL-A6-EP-GF-001
Approved
KHEP-SD-EL-A6-EP-FF-002
Electrical 1 Approval 23-May-2017 B w/
KHEP-SD-EL-A6-EP-RF-003
comments

KHEP-SD-EL-A6-EP-GF-001
Approved
KHEP-SD-EL-A6-EP-FF-002
Electrical 1 Approval 27-Dec-2017 B w/
KHEP-SD-EL-A6-EP-RF-003
comments

KHEP-SD-EL-GN-CP-000 KHEP-
SD-EL-GN-DI-001
KHEP-SD-EL-GN-LE-002
KHEP-SD-EL-LV-SLD-101
KHEP-SD-EL-LV-SLD-101
KHEP-SD-EL-LV-SLD-102
KHEP-SD-EL-LV-SLD-103
KHEP-SD-EL-LV-SLD-104
KHEP-SD-EL-LV-SLD-105
KHEP-SD-EL-LV-SLD-106
KHEP-SD-EL-LV-SLD-107
Electrical 1 Approval 6-Apr-2017 A Approved
KHEP-SD-EL-LV-SLD-108
KHEP-SD-EL-LV-SLD-109
KHEP-SD-EL-LV-SLD-110
KHEP-SD-EL-LV-SLD-111
KHEP-SD-EL-LV-SLD-112
KHEP-SD-EL-LV-SLD-113
KHEP-SD-EL-LV-SLD-114
KHEP-SD-EL-LV-SLD-115
KHEP-SD-EL-LV-SLD-116
KHEP-SD-EL-LV-SLD-117

KHEP-SD-EL-A6-FA-GF-001
Electrical 1 Approval 28-Mar-2017 E Rejected
KHEP-SD-EL-A6-FA-FF-002
Revise & KHEP-SD-EL-A6-FA-GF-001
Electrical 1 Approval 18-Apr-2017 C Resubmit KHEP-SD-EL-A6-FA-FF-002
KHEP-SD-EL-A6-FA-GF-001
Revise &
Electrical 1 Approval 3-Jan-2018 C Resubmit
KHEP-SD-EL-A6-FA-FF-002
KHEP-SD-EL-A6-FA-SL-001
KHEP-SD-EL-A6-FA-GF-001
KHEP-SD-EL-A6-FA-FF-002
Revise &
Electrical 1 Approval 11-Feb-2018 C Resubmit
KHEP-SD-EL-A6-FA-SL-001
KHEP-SD-EL-A6-FA-G-002
KHEP-SD-EL-A6-FA-G-003
KHEP-SD-EL-A6-PM-GF-001
Revise &
Electrical 1 Approval 8-Apr-2017 C Resubmit
KHEP-SD-EL-A6-PM-FF-002
KHEP-SD-EL-A6-PM-RF-003
KHEP-SD-EL-A6-PM-GF-001
Revise &
Electrical 1 Approval 11-May-2017 C Resubmit
KHEP-SD-EL-A6-PM-FF-002
KHEP-SD-EL-A6-PM-RF-003

KHEP-SD-EL-A6-PM-GF-001
Revise &
Electrical 1 Approval 23-May-2017 C Resubmit
KHEP-SD-EL-A6-PM-FF-002
KHEP-SD-EL-A6-PM-RF-003

KHEP-SD-EL-A6-PM-GF-001
Electrical 1 Approval 1-Jun-2017 A Approved KHEP-SD-EL-A6-PM-FF-002
KHEP-SD-EL-A6-PM-RF-003
KHEP-SD-EL-A6-PM-GF-001
Electrical 1 Approval 24-Oct-2017 A Approved KHEP-SD-EL-A6-PM-FF-002
KHEP-SD-EL-A6-PM-RF-003
Revise & KHEP-SD-EL-A6-PS-TA01
Electrical 1 Approval 5-Apr-2017 C Resubmit KHEP-SD-EL-A6-PS-TA02
KHEP-SD-EL-A6-PS-TA01
Electrical 1 Approval 22-May-2017 A Approved
KHEP-SD-EL-A6-PS-TA02
Approved
KHEP-SD-EL-A6-PS-TA01
Electrical 1 Approval 24-Oct-2017 B w/
KHEP-SD-EL-A6-PS-TA02
comments
KHEP-SD-EL-A6-PS-TA01
Electrical 1 Approval 8-Nov-2017 A Approved
KHEP-SD-EL-A6-PS-TA02
Revise &
Electrical 1 Approval 5-Apr-2017 C Resubmit
KHEP-SD-EL-A4-ER-GF-001

Electrical 1 Approval 20-Apr-2017 A Approved KHEP-SD-EL-A4-ER-GF-001


KHEP-SD-EL-A4-LT-GF-001
Revise &
Electrical 1 Approval 13-Apr-2017 C Resubmit
KHEP-SD-EL-A4-LT-FF-002
KHEP-SD-EL-A4-LT-RF-003
KHEP-SD-EL-A4-LT-GF-001
Revise &
Electrical 1 Approval 18-May-2017 C Resubmit
KHEP-SD-EL-A4-LT-FF-002
KHEP-SD-EL-A4-LT-RF-003
KHEP-SD-EL-A4-LT-GF-001
Revise &
Electrical 1 Approval 31-May-2017 C Resubmit
KHEP-SD-EL-A4-LT-FF-002
KHEP-SD-EL-A4-LT-RF-003
Approved KHEP-SD-EL-A4-LT-GF-001
Electrical 1 Approval 28-Aug-2017 B w/ KHEP-SD-EL-A4-LT-FF-002
comments KHEP-SD-EL-A4-LT-RF-003
KHEP-SD-EL-A6-PM-GF-001
Revise &
Electrical 1 Approval 6-Apr-2017 C Resubmit
KHEP-SD-EL-A6-PM-FF-002
KHEP-SD-EL-A6-PM-RF-003
KHEP-SD-EL-A4-EP-GF-001
Revise &
Electrical 1 Approval 9-May-2017 C Resubmit
KHEP-SD-EL-A4-EP-FF-002
KHEP-SD-EL-A4-EP-RF-003
Approved KHEP-SD-EL-A4-EP-GF-001
Electrical 1 Approval 23-May-2017 B w/ KHEP-SD-EL-A4-EP-FF-002
comments KHEP-SD-EL-A4-EP-RF-003
Approved KHEP-SD-EL-A4-EP-GF-001
Electrical 1 Approval 4-Jan-2018 B w/ KHEP-SD-EL-A4-EP-FF-002
comments
KHEP-SD-EL-A4-PM-GF-001
Revise &
Electrical 1 Approval 8-Apr-2017 C Resubmit
KHEP-SD-EL-A4-PM-FF-002
KHEP-SD-EL-A4-PM-RF-003
Approved KHEP-SD-EL-A4-PM-GF-001
Electrical 1 Approval 20-Apr-2017 B w/ KHEP-SD-EL-A4-PM-FF-002
comments KHEP-SD-EL-A4-PM-RF-003
KHEP-SD-EL-A4-PM-GF-001
Electrical 1 Approval 13-Jun-2017 A Approved KHEP-SD-EL-A4-PM-FF-002
KHEP-SD-EL-A4-PM-RF-003
Revise & KHEP-SD-EL-A6-PS-TA01
Electrical 1 Approval 6-Apr-2017 C Resubmit KHEP-SD-EL-A6-PS-TA02
KHEP-SD-EL-A4-PS-TA01
Electrical 1 Approval 22-May-2017 A Approved
KHEP-SD-EL-A4-PS-TA02
KHEP-SD-EL-A4-PS-TA01
Electrical 1 Approval 8-Nov-2017 A Approved
KHEP-SD-EL-A4-PS-TA02
Revise & KHEP-SD-EL-A4-FA-GF-001
Electrical 1 Approval 18-Apr-2017 C Resubmit KHEP-SD-EL-A4-FA-FF-002
KHEP-SD-EL-A4-FA-GF-001
Revise &
Electrical 1 Approval 3-Jan-2018 C Resubmit
KHEP-SD-EL-A4-FA-FF-002
KHEP-SD-EL-A4-FA-SL-001
Revise & KHEP-SD-EL-A4-TE-GF-001
Electrical 1 Approval 6-Apr-2017 C Resubmit KHEP-SD-EL-A4-TE-FF-002
Approved
KHEP-SD-EL-A4-TE-GF-001
Electrical 1 Approval 25-May-2017 B w/
KHEP-SD-EL-A4-TE-FF-002
comments
Revise & KHEP-SD-EL-A4-TE-GF-001
Electrical 1 Approval 2-Jan-2018 C Resubmit KHEP-SD-EL-A4-TE-FF-002
KHEP-SD-EL-A4-TE-GF-001
Electrical 1 Approval 24-Jan-2018 A Approved
KHEP-SD-EL-A4-TE-FF-002
KHEP-SD-EL-MV-201
KHEP-SD-EL-MV-202
KHEP-SD-EL-MV-203
KHEP-SD-EL-MV-204
KHEP-SD-EL-MV-205
Approved KHEP-SD-EL-MV-206
Electrical 1 Approval 29-Apr-2017 B w/ KHEP-SD-EL-MV-207
comments KHEP-SD-EL-MV-208
KHEP-SD-EL-MV-209
KHEP-SD-EL-MV-210
KHEP-SD-EL-MV-211
KHEP-SD-EL-MV-212

KHEP-SD-EL-LL-401
KHEP-SD-EL-LL-402
KHEP-SD-EL-LL-403
KHEP-SD-EL-LL-404
KHEP-SD-EL-LL-405
KHEP-SD-EL-LL-406
Revise &
Electrical 1 Approval 29-Apr-2017 C Resubmit
KHEP-SD-EL-LL-407
KHEP-SD-EL-LL-408
KHEP-SD-EL-LL-409
KHEP-SD-EL-LL-410
KHEP-SD-EL-LL-411
KHEP-SD-EL-LL-412

KHEP-SD-EL-LL-401
KHEP-SD-EL-LL-402
KHEP-SD-EL-LL-403
KHEP-SD-EL-LL-404
KHEP-SD-EL-LL-405
Approved
KHEP-SD-EL-LL-406
Electrical 1 Approval 24-May-2017 C w/
KHEP-SD-EL-LL-407
comments
KHEP-SD-EL-LL-408
KHEP-SD-EL-LL-409
KHEP-SD-EL-LL-410
KHEP-SD-EL-LL-411
KHEP-SD-EL-LL-412

KHEP-SD-EL-LL-401
KHEP-SD-EL-LL-402
KHEP-SD-EL-LL-403
KHEP-SD-EL-LL-404
KHEP-SD-EL-LL-405
KHEP-SD-EL-LL-406
Electrical 1 Approval 15-Jun-2017 A Approved
KHEP-SD-EL-LL-407
KHEP-SD-EL-LL-408
KHEP-SD-EL-LL-409
KHEP-SD-EL-LL-410
KHEP-SD-EL-LL-411
KHEP-SD-EL-LL-412

KHEP-SD-EL-LS-501
KHEP-SD-EL-LS-502
KHEP-SD-EL-LS-503
KHEP-SD-EL-LS-504
KHEP-SD-EL-LS-505
Revise &
Electrical 1 Approval 14-May-2017 C Resubmit
KHEP-SD-EL-LS-506
KHEP-SD-EL-LS-507
KHEP-SD-EL-LS-508
KHEP-SD-EL-LS-509
KHEP-SD-EL-LS-510
KHEP-SD-EL-LS-501
KHEP-SD-EL-LS-502
KHEP-SD-EL-LS-503
KHEP-SD-EL-LS-504
KHEP-SD-EL-LS-505
Electrical 1 Approval 31-May-2017 A Approved
KHEP-SD-EL-LS-506
KHEP-SD-EL-LS-507
KHEP-SD-EL-LS-508
KHEP-SD-EL-LS-509
KHEP-SD-EL-LS-510

KHEP-SD-EL-LV-301
KHEP-SD-EL-LV-302
KHEP-SD-EL-LV-303
KHEP-SD-EL-LV-304
KHEP-SD-EL-LV-305
Approved KHEP-SD-EL-LV-306
Electrical 1 Approval 13-Apr-2017 B w/ KHEP-SD-EL-LV-307
comments KHEP-SD-EL-LV-308
KHEP-SD-EL-LV-309
KHEP-SD-EL-LV-310
KHEP-SD-EL-LV-311
KHEP-SD-EL-LV-312

1356DF-SD-E-LL-400
Electrical 1 Approval 4-May-2017 A Approved 1356DF-SD-E-LS-500
1356DF-SD-E-MV-200
Electrical 1 Approval 20-Apr-2017 A Approved KHEP-SD-EL-LV-300
KHEP -SD-EL- B2-ER- GF-001
Electrical 1 Approval 20-Apr-2017 A Approved RELATED TRANSMITTAL:
KHEP- SD-EL-0001-01

KHEP-SD-EL-B4-LT-GF-002
Revise &
Electrical 1 Approval 15-May-2017 C Resubmit
KHEP-SD-EL-B4-LT-FF-003
KHEP-SD-EL-B4-LT-RF-004

KHEP-SD-EL-B4-LT-GF-002
Revise &
Electrical 1 Approval 31-May-2017 C Resubmit
KHEP-SD-EL-B4-LT-FF-003
KHEP-SD-EL-B4-LT-RF-004
Approved KHEP-SD-EL-B4-LT-GF-002
Electrical 1 Approval 28-Aug-2017 B w/ KHEP-SD-EL-B4-LT-FF-003
comments KHEP-SD-EL-B4-LT-RF-004
KHEP-SD-EL-B4-EP-GF-005
Revise &
Electrical 1 Approval 29-Apr-2017 C Resubmit
KHEP-SD-EL-B4-EP-FF-006
KHEP-SD-EL-B4-EP-RF-007
KHEP-SD-EL-B4-EP-GF-005
Revise &
Electrical 1 Approval 23-May-2017 C Resubmit
KHEP-SD-EL-B4-EP-FF-006
KHEP-SD-EL-B4-EP-RF-007
KHEP-SD-EL-B4-EP-GF-005
Electrical 1 Approval 1-Jun-2017 A Approved KHEP-SD-EL-B4-EP-FF-006
KHEP-SD-EL-B4-EP-RF-007
KHEP-SD-EL-B4-PM-GF-008
Revise &
Electrical 1 Approval 4-May-2017 C Resubmit
KHEP-SD-EL-B4-PM-FF-009
KHEP-SD-EL-B4-PM-RF-010
KHEP-SD-EL-B4-PM-GF-008
Revise & KHEP-SD-EL-B4-PM-FF-009
Electrical 1 Approval 23-May-2017 C Resubmit KHEP-SD-EL-B4-PM-RF-010

KHEP-SD-EL-B4-PM-GF-008
KHEP-SD-EL-B4-PM-FF-009
Electrical 1 Approval 1-Jun-2017 A Approved
KHEP-SD-EL-B4-PM-RF-010

Approved
KHEP-SD-EL-B4-TE-GF-011
Electrical 1 Approval 25-May-2017 B w/
KHEP-SD-EL-B4-TE-FF-012
comments
Revise & KHEP-SD-EL-B4-TE-GF-011
Electrical 1 Approval 2-Jan-2018 C Resubmit KHEP-SD-EL-B4-TE-FF-012
KHEP-SD-EL-B4-TE-GF-011
Electrical 1 Approval 24-Jan-2018 A Approved
KHEP-SD-EL-B4-TE-FF-012
Revise & KHEP-SD-EL-B4-FA-GF-013
Electrical 1 Approval 30-Apr-2017 C Resubmit KHEP-SD-EL-B4-FA-FF-014
KHEP-SD-EL-B4-FA-GF-013
Revise &
Electrical 1 Approval 3-Jan-2018 C Resubmit
KHEP-SD-EL-B4-FA-FF-014
KHEP-SD-EL-B4-FA-SL-018
Approved
KHEP-SD-EL-B4-PS-TB1-015
Electrical 1 Approval 4-May-2017 B w/
KHEP-SD-EL-B4-PS-TB2-016
comments
KHEP-SD-EL-B4-PS-TB1-015
Electrical 1 Approval 8-Nov-2017 A Approved
KHEP-SD-EL-B4-PS-TB2-016
Electrical 1 Approval 4-May-2017 A Approved KHEP-SD-EL-LV-SLD-118
KHEP -SD-EL- B2-EP- GF-001
KHEP -SD-EL- B2-EP- FF-002
Revise &
Electrical 1 Approval 29-Apr-2017 C Resubmit
KHEP -SD-EL- B2-EP- RF-003
RELATED TRANSMITTAL: KHEP-
SD-EL-0001-01
KHEP -SD-EL- B2-EP- GF-001
KHEP -SD-EL- B2-EP- FF-002
Revise & KHEP -SD-EL- B2-EP- RF-003
Electrical 1 Approval 23-May-2017 C Resubmit RELATED TRANSMITTAL: KHEP-
SD-EL-0001-01 KHEP-SD-EL-
0034-00
KHEP -SD-EL- B2-EP- GF-001
Electrical 1 Approval 19-Jun-2017 A Approved KHEP -SD-EL- B2-EP- FF-002
KHEP -SD-EL- B2-EP- RF-003
Approved KHEP -SD-EL- B2-EP- GF-001
Electrical 1 Approval 13-Nov-2017 B w/ KHEP -SD-EL- B2-EP- FF-002
comments KHEP -SD-EL- B2-EP- RF-003
KHEP-SD-EL-A6-TE-GF-001
Approved
KHEP-SD-EL-A6-TE-FF-002
Electrical 1 Approval 25-May-2017 B w/
RELATED TRANSMITTAL: KHEP-SD-EL-
comments
0008-00
KHEP-SD-EL-A6-TE-GF-001
Revise & KHEP-SD-EL-A6-TE-FF-002
Electrical 1 Approval 26-Oct-2017 C Resubmit RELATED TRANSMITTAL: KHEP-SD-EL-
0008-00
KHEP-SD-EL-A6-TE-GF-001
Revise & KHEP-SD-EL-A6-TE-FF-002
Electrical 1 Approval 14-Nov-2017 C Resubmit RELATED TRANSMITTAL: KHEP-SD-EL-
0008-00
KHEP-SD-EL-A6-TE-GF-001
Revise & KHEP-SD-EL-A6-TE-FF-002
Electrical 1 Approval 2-Jan-2018 C Resubmit RELATED TRANSMITTAL: KHEP-SD-EL-
0008-00
KHEP-SD-EL-A6-TE-GF-001
Electrical 1 Approval 24-Jan-2018 A Approved
KHEP-SD-EL-A6-TE-FF-002
KHEP -SD-EL- B2-LT- GF-001
KHEP -SD-EL- B2-LT- FF-002
Revise &
Electrical 1 Approval 17-May-2017 C Resubmit
KHEP -SD-EL- B2-LT- RF-003
RELATED TRANSMITTAL:
KHEP-SD-EL-0001-01
KHEP -SD-EL- B2-LT- GF-001
Revise & KHEP -SD-EL- B2-LT- FF-002
Electrical 1 Approval 31-May-2017 C Resubmit KHEP -SD-EL- B2-LT- RF-003

KHEP -SD-EL- B2-LT- GF-001


Approved
KHEP -SD-EL- B2-LT- FF-002
Electrical 1 Approval 28-Aug-2017 B w/
KHEP -SD-EL- B2-LT- RF-003
comments

KHEP -SD-EL- B6-LT- GF-002


Revise &
Electrical 1 Approval 16-May-2017 C Resubmit
KHEP -SD-EL- B6-LT- FF-003
KHEP -SD-EL- B6-LT- RF-004

KHEP -SD-EL- B6-LT- GF-002


Revise &
Electrical 1 Approval 31-May-2017 C Resubmit
KHEP -SD-EL- B6-LT- FF-003
KHEP -SD-EL- B6-LT- RF-004

Approved KHEP -SD-EL- B6-LT- GF-002


Electrical 1 Approval 28-Aug-2017 B w/ KHEP -SD-EL- B6-LT- FF-003
comments KHEP -SD-EL- B6-LT- RF-004
KHEP-SD-EL-B6-EP-GF-005
Revise & KHEP-SD-EL-B6-EP-FF-006
Electrical 1 Approval 11-May-2017 C Resubmit KHEP-SD-EL-B6-EP-RF-007

Approved KHEP-SD-EL-B6-EP-GF-005
Electrical 1 Approval 23-May-2017 B w/ KHEP-SD-EL-B6-EP-FF-006
comments KHEP-SD-EL-B6-EP-RF-007

Approved KHEP-SD-EL-B6-EP-GF-005
Electrical 1 Approval 4-Jan-2018 B w/ KHEP-SD-EL-B6-EP-FF-006
comments

KHEP-SD-EL-B6-PM-GF-008
Revise & KHEP-SD-EL-B6-PM-FF-009
Electrical 1 Approval 22-May-2017 C Resubmit KHEP-SD-EL-B6-PM-RF-010

KHEP-SD-EL-B6-PM-GF-008
KHEP-SD-EL-B6-PM-FF-009
Electrical 1 Approval 1-Jun-2017 A Approved
KHEP-SD-EL-B6-PM-RF-010

Approved
KHEP-SD-EL-B6-TE-GF-011
Electrical 1 Approval 25-May-2017 B w/
KHEP-SD-EL-B6-TE-FF-012
comments

Revise & KHEP-SD-EL-B6-TE-GF-011


Electrical 1 Approval 2-Jan-2018 C Resubmit KHEP-SD-EL-B6-TE-FF-012
KHEP-SD-EL-B6-TE-GF-011
Electrical 1 Approval 24-Jan-2018 A Approved
KHEP-SD-EL-B6-TE-FF-012
KHEP-SD-EL-B6-PS-TB1-015
Electrical 1 Approval 20-May-2017 A Approved KHEP-SD-EL-B6-PS-TB2-016
KHEP-SD-EL-B6-PS-TB3-017
KHEP-SD-EL-B6-PS-TB1-015
Electrical 1 Approval 8-Nov-2017 A Approved KHEP-SD-EL-B6-PS-TB2-016
KHEP-SD-EL-B6-PS-TB3-017
KHEP-SD-EL-A6-LT-GF-001
KHEP-SD-EL-A6-LT-FF-002
Revise &
Electrical 1 Approval 18-May-2017 C Resubmit
KHEP-SD-EL-A6-LT-RF-003
RELATED TRANSMITTAL: KHEP-SD-EL-
0008-00
KHEP-SD-EL-A6-LT-GF-001
Revise & KHEP-SD-EL-A6-LT-FF-002
Electrical 1 Approval 31-May-2017 C Resubmit KHEP-SD-EL-A6-LT-RF-003

KHEP-SD-EL-A6-LT-GF-001
Approved
KHEP-SD-EL-A6-LT-FF-002
Electrical 1 Approval 28-Aug-2017 B w/
KHEP-SD-EL-A6-LT-RF-003
comments

Approved KHEP-SD-EL-A6-LT-GF-001
Electrical 1 Approval 4-Jan-2018 B w/ KHEP-SD-EL-A6-LT-RF-003
comments Related DC KHEP-RFC-EL-0045-00
Approved
Electrical 1 Approval 13-Jul-2017 B w/ KHEP-SD-EL-AB-PM-001
comments
Approved
Electrical 1 Approval 13-Jul-2017 B w/ KHEP-SD-EL-AB-EP-002
comments
Approved
Electrical 1 Approval 13-Jul-2017 B w/ KHEP-SD-EL-AB-LT-003
comments

Electrical 1 Approval 13-Jul-2017 A Approved KHEP-SD-EL-AB-ER-004

Approved
Electrical 1 Approval 13-Jul-2017 B w/ KHEP-SD-EL-AB-TE-005
comments
Revise &
Electrical 1 Approval 13-Jul-2017 C Resubmit
KHEP-SD-EL-AB-PS-007
Revise &
Electrical 1 Approval 8-Aug-2017 C Resubmit
KHEP-SD-EL-AB-PS-007

Electrical 1 Approval 16-Aug-2017 A Approved KHEP-SD-EL-AB-PS-007


Approved
Electrical 1 Approval 27-Jul-2017 B w/ KHEP-SD-EL-PTA-PM-001
comments
Approved
Electrical 1 Approval 27-Jul-2017 B w/ KHEP-SD-EL-PTA-EP-002
comments

Electrical 1 Approval 27-Jul-2017 A Approved KHEP-SD-EL-PTA-LT-003

Revise &
Electrical 1 Approval 27-Jul-2017 C Resubmit
KHEP-SD-EL-PTA-ER-004

Electrical 1 Approval 8-Aug-2017 A Approved KHEP-SD-EL-PTA-ER-004

Approved
Electrical 1 Approval 27-Jul-2017 B w/ KHEP-SD-EL-PT-PM-001
comments
Approved
Electrical 1 Approval 27-Jul-2017 B w/ KHEP-SD-EL-PT-EP-002
comments
Approved
Electrical 1 Approval 27-Jul-2017 B w/ KHEP-SD-EL-PT-LT-003
comments

Revise &
Electrical 1 Approval 27-Jul-2017 C Resubmit
KHEP-SD-EL-PT-ER-004

Electrical 1 Approval 8-Aug-2017 A Approved KHEP-SD-EL-PT-ER-004

Revise &
Electrical 1 Approval 26-Jul-2017 C Resubmit
KHEP-SD-EL-PT-TE-005

Electrical 1 Approval 8-Aug-2017 A Approved KHEP-SD-EL-PT-TE-005

Revise & KHEP-SD-EL-PT-PS-007


Electrical 1 Approval 26-Jul-2017 C Resubmit KHEP-SD-EL-PT-PS-008
KHEP-SD-EL-PT-PS-007
Electrical 1 Approval 8-Aug-2017 A Approved
KHEP-SD-EL-PT-PS-008
Approved KHEP-SD-EL-A4-EP-RF-003
Electrical 1 Approval 19-Sep-2017 B w/ Related Transmittal:
comments KHEP-SD-EL-0015-02
Approved KHEP-SD-EL-A6-EP-RF-003
Electrical 1 Approval 19-Sep-2017 B w/ Related Transmittal:
comments KHEP-SD-EL-0008-02
Electrical 1 Approval 29-Oct-2017 A Approved KHEP-SD-EL-A6-EP-RF-003
Approved KHEP-SD-EL-B4-EP-RF-007
Electrical 1 Approval 19-Sep-2017 B w/ Related Transmittal:
comments KHEP-SD-EL-0008-02
Approved KHEP-SD-EL-B6-EP-RF-007
Electrical 1 Approval 19-Sep-2017 B w/ Related Transmittal:
comments KHEP-SD-EL-0038-01
KHEP-SD-EL-A6-LT-FF-002
Electrical 1 Approval 19-Sep-2017 A Approved Reference to Transmittal:
KHEP-SD-EL-0014-03
KHEP-SD-EL-A6-LT-FF-002
Electrical 1 Approval 19-Sep-2017 A Approved Reference to Transmittal:
KHEP-SD-EL-0042-02
KHEP-SD-EL-B2-LT-GF-001
KHEP-SD-EL-B2-LT-FF-002
Electrical 1 Approval 19-Sep-2017 A Approved Reference to Transmittal:
KHEP-SD-EL-0036-02
KHEP-SD-EL-B4-LT-GF-002
KHEP-SD-EL-B4-LT-FF-003
Electrical 1 Approval 19-Sep-2017 A Approved Reference to Transmittal:
KHEP-SD-EL-0027-02
KHEP-SD-EL-B6-LT-GF-002
Approved KHEP-SD-EL-B6-LT-FF-003
Electrical 1 Approval 19-Sep-2017 B w/ Reference to Transmittal:
comments KHEP-SD-EL-0037-02

KHEP-SD-EL-A6-LT-FF-002
Electrical 1 Approval 19-Nov-2017 A Approved Related Document - KHEP-SD-EL-0064-00

KHEP-SD-EL-B2-LT-FF-002
Electrical 1 Approval 19-Nov-2017 A Approved Related Document - KHEP-SD-EL-0065-00

KHEP-SD-EL-B4-PM-GF-008
Revise &
Electrical 1 Approval 30-Dec-2017 C Resubmit
KHEP-SD-EL-B4-PM-FF-009
KHEP-SD-EL-B4-PM-RF-010
KHEP-SD-EL-B4-PM-GF-008
Revise &
Electrical 1 Approval 22-Jan-2018 C Resubmit
KHEP-SD-EL-B4-PM-FF-009
KHEP-SD-EL-B4-PM-RF-010
Approved KHEP-SD-EL-B4-PM-GF-008
Electrical 1 Approval 1-Feb-2018 B w/ KHEP-SD-EL-B4-PM-FF-009
comments KHEP-SD-EL-B4-PM-RF-010
KHEP-SD-EL-B4-PM-GF-008
Revise &
Electrical 1 Approval 21-Feb-2018 C Resubmit
KHEP-SD-EL-B4-PM-FF-009
KHEP-SD-EL-B4-PM-RF-010
Approved
KHEP-SD-EL-B4-EP-GF-005
Electrical 1 Approval 30-Dec-2017 B w/
KHEP-SD-EL-B4-EP-FF-006
comments
KHEP-SD-EL-B6-PM-GF-008
Revise &
Electrical 1 Approval 4-Jan-2018 C Resubmit
KHEP-SD-EL-B6-PM-FF-009
KHEP-SD-EL-B6-PM-RF-010
KHEP-SD-EL-B6-PM-GF-008
Revise &
Electrical 1 Approval 22-Jan-2018 C Resubmit
KHEP-SD-EL-B6-PM-FF-009
KHEP-SD-EL-B6-PM-RF-010
Approved KHEP-SD-EL-B6-PM-GF-008
Electrical 1 Approval 20-Feb-2018 B w/ KHEP-SD-EL-B6-PM-FF-009
comments KHEP-SD-EL-B6-PM-RF-010
KHEP-SD-EL-A4-ER-GF-001
Revise & KHEP-SD-EL-A4-LP-RF-001
Electrical 1 Approval 1-Jan-2018 C Resubmit Related Transmital - KHEP-SD-EL-0013-01

KHEP-SD-EL-A6-ER-GF-001
Revise & KHEP-SD-EL-A6-LP-RF-001
Electrical 1 Approval 1-Jan-2018 C Resubmit Related Transmital - KHEP-SD-EL-0013-01

KHEP-SD-EL-B2-ER-GF-001
Revise & KHEP-SD-EL-B2-LP-RF-001
Electrical 1 Approval 1-Jan-2018 C Resubmit Related Transmital - KHEP-SD-EL-0026-00

KHEP-SD-EL-B4-ER-GF-001
Revise & KHEP-SD-EL-B4-LP-RF-001
Electrical 1 Approval 1-Jan-2018 C Resubmit Related Transmital - KHEP-SD-EL-0005-00

KHEP-SD-EL-B6-ER-GF-001
Revise & KHEP-SD-EL-B6-LP-RF-001
Electrical 1 Approval 1-Jan-2018 C Resubmit Related Transmital - KHEP-SD-EL-0005-00

KHEP-SD-EL-A4-LT-GF-001
KHEP-SD-EL-A4-LT-FF-002
Approved
KHEP-SD-EL-A4-LT-RF-003
Electrical 1 Approval 4-Jan-2018 B w/
Related Transmital - KHEP-RFC-EL-
comments
0036-00 / KHEP-RFC-EL-0045-00

KHEP-SD-EL-A4-PM-GF-001
Revise & KHEP-SD-EL-A4-PM-FF-002
Electrical 1 Approval 2-Jan-2018 C Resubmit KHEP-SD-EL-A4-PM-RF-003

KHEP-SD-EL-A4-PM-GF-001
Revise &
Electrical 1 Approval 22-Jan-2018 C Resubmit
KHEP-SD-EL-A4-PM-FF-002
KHEP-SD-EL-A4-PM-RF-003
Approved KHEP-SD-EL-A4-PM-GF-001
Electrical 1 Approval 20-Feb-2018 B w/ KHEP-SD-EL-A4-PM-FF-002
comments KHEP-SD-EL-A4-PM-RF-003
KHEP-SD-EL-B6-FA-GF-013
Revise &
Electrical 1 Approval 3-Jan-2018 C Resubmit
KHEP-SD-EL-B6-FA-FF-014
KHEP-SD-EL-B6-FA-SL-019
KHEP-SD-EL-A6-PM-GF-001
Revise &
Electrical 1 Approval 22-Jan-2018 C Resubmit
KHEP-SD-EL-A6-PM-FF-002
KHEP-SD-EL-A6-PM-RF-003
Approved KHEP-SD-EL-A6-PM-GF-001
Electrical 1 Approval 20-Feb-2018 B w/ KHEP-SD-EL-A6-PM-FF-002
comments KHEP-SD-EL-A6-PM-RF-003
KHEP-SD-EL-B2-PM-GF-001
Revise &
Electrical 1 Approval 22-Jan-2018 C Resubmit
KHEP-SD-EL-B2-PM-FF-002
KHEP-SD-EL-B2-PM-RF-003
Approved KHEP-SD-EL-B2-PM-GF-001
Electrical 1 Approval 1-Feb-2018 B w/ KHEP-SD-EL-B2-PM-FF-002
comments KHEP-SD-EL-B2-PM-RF-003
KHEP-SD-EL-B2-PM-GF-001
Revise &
Electrical 1 Approval 21-Feb-2018 C Resubmit
KHEP-SD-EL-B2-PM-FF-002
KHEP-SD-EL-B2-PM-RF-003
Revise &
Electrical 1 Approval 10-Feb-2018 C Resubmit
KHEP-SD-EL-A4-ER-GF-001

Electrical 1 Approval KHEP-SD-EL-A4-ER-GF-001


Revise &
Electrical 1 Approval 10-Feb-2018 C Resubmit
KHEP-SD-EL-A6-ER-GF-001

Electrical 1 Approval KHEP-SD-EL-A6-ER-GF-001


Electrical 1 Approval 10-Feb-2018 C KHEP-SD-EL-B2-ER-GF-001
Electrical 1 Approval KHEP-SD-EL-B2-ER-GF-001
Revise &
Electrical 1 Approval 10-Feb-2018 C Resubmit
KHEP-SD-EL-B4-ER-GF-001

Electrical 1 Approval KHEP-SD-EL-B4-ER-GF-001


Revise &
Electrical 1 Approval 10-Feb-2018 C Resubmit
KHEP-SD-EL-B6-ER-GF-001

Electrical 1 Approval KHEP-SD-EL-B6-ER-GF-001

1356DF-SD-T-GN-001
1356DF-SD-T-DT-401
1356DF-SD-T-DT-402
1356DF-SD-T-DT-403
1356DF-SD-T-DT-404
1356DF-SD-T-DT-405
1356DF-SD-T-DT-406
1356DF-SD-T-DT-407
1356DF-SD-T-DT-408
Revise &
Low Current 1 Approval 15-Mar-2017 C Resubmit
1356DF-SD-T-DT-409
1356DF-SD-T-DT-410
1356DF-SD-T-DT-411
1356DF-SD-T-DT-412
1356DF-SD-T-DT-413
1356DF-SD-T-DT-414
1356DF-SD-T-DT-415
1356DF-SD-T-DT-416
1356DF-SD-T-DT-417
KHEP-SD-LC-TE-GN-001
KHEP-SD-LC-TE-DT-401
KHEP-SD-LC-TE-DT-402
KHEP-SD-LC-TE-DT-403
KHEP-SD-LC-TE-DT-404
KHEP-SD-LC-TE-DT-405
KHEP-SD-LC-TE-DT-406
KHEP-SD-LC-TE-DT-407
KHEP-SD-LC-TE-DT-408
Revise &
Low Current 1 Approval 4-Apr-2017 C Resubmit
KHEP-SD-LC-TE-DT-409
KHEP-SD-LC-TE-DT-410
KHEP-SD-LC-TE-DT-411
KHEP-SD-LC-TE-DT-412
KHEP-SD-LC-TE-DT-413
KHEP-SD-LC-TE-DT-414
KHEP-SD-LC-TE-DT-415
KHEP-SD-LC-TE-DT-416
KHEP-SD-LC-TE-DT-417

KHEP-SD-LC-TE-GN-001
KHEP-SD-LC-TE-DT-401
KHEP-SD-LC-TE-DT-402
KHEP-SD-LC-TE-DT-403
KHEP-SD-LC-TE-DT-404
KHEP-SD-LC-TE-DT-405
KHEP-SD-LC-TE-DT-406
KHEP-SD-LC-CC-DT-407
KHEP-SD-LC-TE-DT-408
Revise &
Low Current 1 Approval 25-May-2017 C Resubmit
KHEP-SD-LC-TE-DT-409
KHEP-SD-LC-TE-DT-410
KHEP-SD-LC-TE-DT-411
KHEP-SD-LC-TE-DT-412
KHEP-SD-LC-TE-DT-413
KHEP-SD-LC-TE-DT-414
KHEP-SD-LC-TE-DT-415
KHEP-SD-LC-TE-DT-416
KHEP-SD-LC-TE-DT-417

KHEP-SD-LC-TE-GN-001
KHEP-SD-LC-TE-DT-401
KHEP-SD-LC-TE-DT-402
KHEP-SD-LC-TE-DT-403
KHEP-SD-LC-TE-DT-404
KHEP-SD-LC-TE-DT-405
KHEP-SD-LC-TE-DT-406
KHEP-SD-LC-CC-DT-407
Approved KHEP-SD-LC-TE-DT-408
Low Current 1 Approval 18-Jul-2017 B w/ KHEP-SD-LC-TE-DT-409
Comments KHEP-SD-LC-TE-DT-410
KHEP-SD-LC-TE-DT-411
KHEP-SD-LC-TE-DT-412
KHEP-SD-LC-TE-DT-413
KHEP-SD-LC-TE-DT-414
KHEP-SD-LC-TE-DT-415
KHEP-SD-LC-TE-DT-416
KHEP-SD-LC-TE-DT-417
KHEP-SD-LC-TE-CO-100
KHEP-SD-LC-TE-CO-113
KHEP-SD-LC-TE-CO-114
KHEP-SD-LC-TE-CO-115
KHEP-SD-LC-TE-CO-116
KHEP-SD-LC-TE-CO-117
KHEP-SD-LC-TE-CO-118
KHEP-SD-LC-TE-CO-119
KHEP-SD-LC-TE-CO-120
KHEP-SD-LC-TE-CO-121
Revise & KHEP-SD-LC-TE-CO-122
Low Current 1 Approval 21-Mar-2017 C Resubmit KHEP-SD-LC-TE-CO-123
KHEP-SD-LC-TE-CO-124
KHEP-SD-LC-TE-CO-125
KHEP-SD-LC-TE-CO-126
KHEP-SD-LC-TE-CO-127
KHEP-SD-LC-TE-CO-128
KHEP-SD-LC-TE-CO-129
KHEP-SD-LC-TE-CO-130
KHEP-SD-LC-TE-CO-131
KHEP-SD-LC-TE-CO-132

KHEP-SD-LC-TE-CO-100
KHEP-SD-LC-TE-CO-113
KHEP-SD-LC-TE-CO-114
KHEP-SD-LC-TE-CO-115
KHEP-SD-LC-TE-CO-116
KHEP-SD-LC-TE-CO-117
KHEP-SD-LC-TE-CO-118
KHEP-SD-LC-TE-CO-119
KHEP-SD-LC-TE-CO-120
KHEP-SD-LC-TE-CO-121
Revise & KHEP-SD-LC-TE-CO-122
Low Current 1 Approval 25-May-2017 C Resubmit KHEP-SD-LC-TE-CO-123
KHEP-SD-LC-TE-CO-124
KHEP-SD-LC-TE-CO-125
KHEP-SD-LC-TE-CO-126
KHEP-SD-LC-TE-CO-127
KHEP-SD-LC-TE-CO-128
KHEP-SD-LC-TE-CO-129
KHEP-SD-LC-TE-CO-130
KHEP-SD-LC-TE-CO-131
KHEP-SD-LC-TE-CO-132

KHEP-SD-LC-TE-CO-100
KHEP-SD-LC-TE-CO-113
KHEP-SD-LC-TE-CO-114
KHEP-SD-LC-TE-CO-115
KHEP-SD-LC-TE-CO-116
KHEP-SD-LC-TE-CO-117
KHEP-SD-LC-TE-CO-118
KHEP-SD-LC-TE-CO-119
KHEP-SD-LC-TE-CO-120
KHEP-SD-LC-TE-CO-121
Approved
KHEP-SD-LC-TE-CO-122
Low Current 1 Approval 22-Jul-2017 B w/
KHEP-SD-LC-TE-CO-123
Comments
KHEP-SD-LC-TE-CO-124
KHEP-SD-LC-TE-CO-125
KHEP-SD-LC-TE-CO-126
KHEP-SD-LC-TE-CO-127
KHEP-SD-LC-TE-CO-128
KHEP-SD-LC-TE-CO-129
KHEP-SD-LC-TE-CO-130
KHEP-SD-LC-TE-CO-131
KHEP-SD-LC-TE-CO-132
KHEP-SD-LC-GN-000
KHEP-SD-LC-TE-CO-101
KHEP-SD-LC-TE-CO-102
KHEP-SD-LC-TE-CO-103
KHEP-SD-LC-TE-CO-104
KHEP-SD-LC-TE-CO-105
Revise & KHEP-SD-LC-TE-CO-106
Low Current 1 Approval 25-May-2017 C Resubmit KHEP-SD-LC-TE-CO-107
KHEP-SD-LC-TE-CO-108
KHEP-SD-LC-TE-CO-109
KHEP-SD-LC-TE-CO-110
KHEP-SD-LC-TE-CO-111
KHEP-SD-LC-TE-CO-112

KHEP-SD-LC-GN-000
KHEP-SD-LC-TE-CO-101
KHEP-SD-LC-TE-CO-102
KHEP-SD-LC-TE-CO-103
KHEP-SD-LC-TE-CO-104
Approved KHEP-SD-LC-TE-CO-105
Low Current 1 Approval 8-Jul-2017 B w/ KHEP-SD-LC-TE-CO-106
Comments KHEP-SD-LC-TE-CO-107
KHEP-SD-LC-TE-CO-108
KHEP-SD-LC-TE-CO-109
KHEP-SD-LC-TE-CO-110
KHEP-SD-LC-TE-CO-111
KHEP-SD-LC-TE-CO-112

KHEP-SD-LC-TE-CO-100
KHEP-SD-LC-TE-CO-101
KHEP-SD-LC-TE-CO-102
KHEP-SD-LC-TE-CO-103
KHEP-SD-LC-TE-CO-104
KHEP-SD-LC-TE-CO-105
Revise &
Low Current 1 Approval 2-Jan-2018 C Resubmit
KHEP-SD-LC-TE-CO-106
KHEP-SD-LC-TE-CO-107
KHEP-SD-LC-TE-CO-108
KHEP-SD-LC-TE-CO-109
KHEP-SD-LC-TE-CO-110
KHEP-SD-LC-TE-CO-111
KHEP-SD-LC-TE-CO-112

KHEP-SD-LC-TE-SC-501
KHEP-SD-LC-TE-SC-501a
KHEP-SD-LC-TE-SC-501b
KHEP-SD-LC-TE-SC-501c
KHEP-SD-LC-TE-SC-501d
Revise &
Low Current 1 Approval 25-May-2017 C Resubmit
KHEP-SD-LC-TE-SC-502
KHEP-SD-LC-CC-SC-503
KHEP-SD-LC-CC-SC-504
KHEP-SD-LC-TE-SC-505
KHEP-SD-LC-TE-SC-506

KHEP-SD-LC-TE-SC-501
KHEP-SD-LC-TE-SC-501a
KHEP-SD-LC-TE-SC-501b
KHEP-SD-LC-TE-SC-501c
KHEP-SD-LC-TE-SC-501d
Revise &
Low Current 1 Approval 23-Jul-2017 C Resubmit
KHEP-SD-LC-TE-SC-502
KHEP-SD-LC-CC-SC-503
KHEP-SD-LC-CC-SC-504
KHEP-SD-LC-TE-SC-505
KHEP-SD-LC-TE-SC-506
KHEP-SD-LC-TE-SC-501
KHEP-SD-LC-TE-SC-501a
KHEP-SD-LC-TE-SC-501b
KHEP-SD-LC-TE-SC-501c
Approved KHEP-SD-LC-TE-SC-501d
Low Current 1 Approval 7-Aug-2017 B w/ KHEP-SD-LC-TE-SC-502
Comments KHEP-SD-LC-CC-SC-503
KHEP-SD-LC-CC-SC-504
KHEP-SD-LC-TE-SC-505
KHEP-SD-LC-TE-SC-506

Approved
Low Current 1 Approval 9-Apr-2017 B w/ KHEP-SD-LC-CC-CO-100
Comments

HVAC
1356DF-SD-ME-HVAC-B2-FF-003
1356DF-SD-ME-HVAC-B2-FF-
004 1356DF-SD-ME-
Revise & HVAC-B2-GF-001 1356DF-
HVAC 1 Approval 4-Mar-2017 C Resubmit SD-ME-HVAC-B2-GF-002
1356DF-SD-ME-HVAC-B2-RF-005
1356DF-SD-ME-HVAC-B2-RF-
006
Approved KHEP-SD-ME-HVAC-B2-FF-003
HVAC 1 Approval 22-Mar-2017 B w/ KHEP-SD-ME-HVAC-B2-GF-001
comments KHEP-SD-ME-HVAC-B2-RF-005
KHEP-SD-ME-HVAC-B2-FF-003
Revise &
HVAC 1 Approval 13-Jul-2017 C Resubmit
KHEP-SD-ME-HVAC-B2-GF-001
KHEP-SD-ME-HVAC-B2-RF-005
KHEP-SD-ME-HVAC-B2-FF-003
Revise &
HVAC 1 Approval 1-Aug-2017 C Resubmit
KHEP-SD-ME-HVAC-B2-GF-001
KHEP-SD-ME-HVAC-B2-RF-005
Approved KHEP-SD-ME-HVAC-B2-FF-003
HVAC 1 Approval 10-Aug-2017 B w/ KHEP-SD-ME-HVAC-B2-GF-001
comments KHEP-SD-ME-HVAC-B2-RF-005
KHEP-SD-HVAC-A6-DW-GF-0001
Revise &
HVAC 1 Approval 8-Apr-2017 C Resubmit
KHEP-SD-HVAC-A6-DW-GF-0003

Revise & KHEP-SD-HVAC-A6-DW-GF-0001


HVAC 1 Approval 30-Apr-2017 C Resubmit KHEP-SD-HVAC-A6-DW-GF-0003
Approved
KHEP-SD-HVAC-A6-DW-GF-0001
HVAC 1 Approval 19-Jul-2017 B w/
KHEP-SD-HVAC-A6-DW-GF-0003
comments
Revise & KHEP-SD-HVAC-A6-DW-GF-0001
HVAC 1 Approval 10-Aug-2017 C Resubmit KHEP-SD-HVAC-A6-DW-GF-0003
KHEP-SD-HVAC-A6-GF-002
Revise &
HVAC 1 Approval 30-Apr-2017 C Resubmit
KHEP-SD-HVAC-A6-FF-004
KHEP-SD-HVAC-A6-RF-006
KHEP-SD-HVAC-A6-GF-002
Revise &
HVAC 1 Approval 15-Jun-2017 C Resubmit
KHEP-SD-HVAC-A6-FF-004
KHEP-SD-HVAC-A6-RF-006
KHEP-SD-HVAC- BC4-GF-001
Revise &
HVAC 1 Approval 8-May-2017 C Resubmit
KHEP-SD-HVAC- BC4-FF-003
KHEP-SD-HVAC- BC4-RF-005
Approved KHEP-SD-HVAC- BC4-DW-GF-001
HVAC 1 Approval 1-Jun-2017 B w/ KHEP-SD-HVAC- BC4-DW-FF-003
comments KHEP-SD-HVAC- BC4-DW-RF-005
KHEP-SD-HVAC- BC4-DW-GF-001
Revise &
HVAC 1 Approval 13-Jul-2017 C Resubmit
KHEP-SD-HVAC- BC4-DW-FF-003
KHEP-SD-HVAC- BC4-DW-RF-005
KHEP-SD-HVAC- BC4-DW-GF-001
Revise &
HVAC 1 Approval 1-Aug-2017 C Resubmit
KHEP-SD-HVAC- BC4-DW-FF-003
KHEP-SD-HVAC- BC4-DW-RF-005
KHEP-SD-HVAC- BC4-DW-GF-001
HVAC 1 Approval 10-Aug-2017 A Approved KHEP-SD-HVAC- BC4-DW-FF-003
KHEP-SD-HVAC- BC4-DW-RF-005
KHEP-SD-HVAC- BC4-GF-002
Revise &
HVAC 1 Approval 1-May-2017 C Resubmit
KHEP-SD-HVAC- BC4-FF-004
KHEP-SD-HVAC- BC4-RF-006
KHEP-SD-HVAC- BC4-GF-002
Revise &
HVAC 1 Approval 15-Jun-2017 C Resubmit
KHEP-SD-HVAC- BC4-FF-004
KHEP-SD-HVAC- BC4-RF-006
KHEP-SD-HVAC-BC6-DW- GF-0001
Revise &
HVAC 1 Approval 10-May-2017 C Resubmit
KHEP-SD-HVAC-BC6-DW- FF-0003
KHEP-SD-HVAC-BC6-DW- RF-0005
Approved KHEP-SD-HVAC-BC6-DW- GF-0001
HVAC 1 Approval 6-Jun-2017 B w/ KHEP-SD-HVAC-BC6-DW- FF-0003
comments KHEP-SD-HVAC-BC6-DW- RF-0005
KHEP-SD-HVAC-BC6-DW- GF-0001
Revise &
HVAC 1 Approval 13-Jul-2017 C Resubmit
KHEP-SD-HVAC-BC6-DW- FF-0003
KHEP-SD-HVAC-BC6-DW- RF-0005
KHEP-SD-HVAC-BC6-DW- GF-0001
Revise &
HVAC 1 Approval 1-Aug-2017 C Resubmit
KHEP-SD-HVAC-BC6-DW- FF-0003
KHEP-SD-HVAC-BC6-DW- RF-0005
KHEP-SD-HVAC-BC6-DW- GF-0001
HVAC 1 Approval 10-Aug-2017 A Approved KHEP-SD-HVAC-BC6-DW- FF-0003
KHEP-SD-HVAC-BC6-DW- RF-0005
KHEP-SD-HVAC-BC6-PW- GF-0002
Revise & KHEP-SD-HVACBC6-PW- FF-0004
HVAC 1 Approval 4-May-2017 C Resubmit KHEP-SD-HVAC-BC6-PW- RF-0006

KHEP-SD-HVAC-BC6-PW- GF-0002
Revise & KHEP-SD-HVACBC6-PW- FF-0004
HVAC 1 Approval 15-Jun-2017 C Resubmit KHEP-SD-HVAC-BC6-PW- RF-0006

Approved
HVAC 1 Approval 4-May-2017 B w/ KHEP-SD-HVAC-A6-DW- GF-0005
comments
Approved
HVAC 1 Approval 19-Jul-2017 B w/ KHEP-SD-HVAC-A6-DW- GF-0005
comments
Revise &
HVAC 1 Approval 10-Aug-2017 C Resubmit
KHEP-SD-HVAC-A6-DW- GF-0005

KHEP-SD-HVAC- A4-DW-GF-0001
Revise &
HVAC 1 Approval 13-May-2017 C Resubmit
KHEP-SD-HVAC- A4-DW-FF-0003
KHEP-SD-HVAC- A4-DW-FF-0005
Approved KHEP-SD-HVAC- A4-DW-GF-0001
HVAC 1 Approval 6-Jun-2017 B w/ KHEP-SD-HVAC- A4-DW-FF-0003
comments KHEP-SD-HVAC- A4-DW-FF-0005
KHEP-SD-HVAC- A4-DW-GF-0001
Revise &
HVAC 1 Approval 13-Jul-2017 C Resubmit
KHEP-SD-HVAC- A4-DW-FF-0003
KHEP-SD-HVAC- A4-DW-FF-0006
KHEP-SD-HVAC- A4-DW-GF-0001
Revise &
HVAC 1 Approval 1-Aug-2017 C Resubmit
KHEP-SD-HVAC- A4-DW-FF-0003
KHEP-SD-HVAC- A4-DW-FF-0006
KHEP-SD-HVAC- A4-DW-GF-0001
HVAC 1 Approval 10-Aug-2017 A Approved KHEP-SD-HVAC- A4-DW-FF-0003
KHEP-SD-HVAC- A4-DW-FF-0006
HVAC 1 Approval 30-May-2017 A Approved KHEP-SD-HVAC-A4-RD-007
Revise &
HVAC 1 Approval 30-May-2017 C Resubmit
KHEP-SD-HVAC-A6-RD-007

HVAC 1 Approval 6-Jun-2017 A Approved KHEP-SD-HVAC-A6-RD-007


HVAC 1 Approval 30-May-2017 A Approved KHEP-SD-HVAC-B2-RD-007
HVAC 1 Approval 30-May-2017 A Approved KHEP-SD-HVAC-BC4-RD-007
HVAC 1 Approval 30-May-2017 A Approved KHEP-SD-HVAC-BC6-RD-007
KHEP-SD-HVAC-A4-PW-GF-0002 KHEP-SD-
Revise &
HVAC 1 Approval 13-Jun-2017 C Resubmit
HVAC-A4-PW-FF-0004 KHEP-SD-HVAC-A4-
PW-RF-0006
Revise &
HVAC 1 Approval 15-Jun-2017 C Resubmit
KHEP-SD-HVAC-A4-PW-RD-0008

Revise &
HVAC 1 Approval 15-Jun-2017 C Resubmit
KHEP-SD-HVAC-BC6-PW-RD-0008
Revise &
HVAC 1 Approval 15-Jun-2017 C Resubmit
KHEP-SD-HVAC-A6-PW-RD-0008

Revise &
HVAC 1 Approval 15-Jun-2017 C Resubmit
KHEP-SD-HVAC-B2-PW-RD-0008

Revise &
HVAC 1 Approval 17-Jun-2017 C Resubmit
KHEP-SD-HVAC-BC4-PW-RD-0008

KHEP-SD-HVAC- B2-PW-GF-002
Revise &
HVAC 1 Approval 15-Jun-2017 C Resubmit
KHEP-SD-HVAC- B2-PW-FF-004
KHEP-SD-HVAC- B2-PW-RF-006
Revise &
HVAC 1 Approval 7-Dec-2017 C Resubmit
KHEP-SD-HVAC-G-001

Revise &
HVAC 1 Approval 11-Jan-2018 C Resubmit
KHEP-SD-HVAC-G-001

Revise & 1356DF-SD-ME-FP-B2-FF-002


Mechanical 1 Approval 28-Feb-2017 C Resubmit 1356DF-SD-ME-FP-B2-GF-001
Revise & KHPE-SD-ME-B2-FP-GF-001
Mechanical 1 Approval 29-May-2017 C Resubmit KHPE-SD-ME-B2-FP-FF-002
Revise & KHPE-SD-ME-B2-FP-GF-001
Mechanical 1 Approval 16-Aug-2017 C Resubmit KHPE-SD-ME-B2-FP-FF-002
Approved KHPE-SD-ME-B2-FP-GF-001
Mechanical 1 Approval 27-Dec-2017 B w/ KHPE-SD-ME-B2-FP-FF-002
comments KHPE-SD-ME-B2-FP-RD-003
Approved
KHEP-SD-ME-B2-FP-GF-001
Mechanical 1 Approval 15-Jan-2018 B w/
KHEP-SD-ME-B2-FP-FF-002
comments
Approved
Mechanical 1 Approval 21-Mar-2017 B w/ KHEP-SD-ME-BW-B2-GF-0001
comments
Approved
KHEP-SD-ME-A6-FP-GF-0001
Mechanical 1 Approval 11-Apr-2017 B w/
KHEP-SD-ME-A6-FP-GF-0002
comments
Revise & KHEP-SD-ME-A6-FP-GF-0001
Mechanical 1 Approval 16-Aug-2017 C Resubmit KHEP-SD-ME-A6-FP-GF-0002
Approved KHEP-SD-ME-A6-FP-GF-0001
Mechanical 1 Approval 13-Nov-2017 B w/ KHEP-SD-ME-A6-FP-FF-0002
comments KHEP-SD-ME-A6-FP-RD-0003
Approved KHEP-SD-ME-A6-FP-GF-0001
Mechanical 1 Approval 1-Feb-2018 B w/ KHEP-SD-ME-A6-FP-FF-0002
comments KHEP-SD-ME-A6-FP-RD-0003
Revise & KHEP-SD-ME-BC4-FP-GF-001
Mechanical 1 Approval 8-May-2017 C Resubmit KHEP-SD-ME-BC4-FP-FF-002
Revise & KHEP-SD-ME-BC4-FP-GF-001
Mechanical 1 Approval 15-Aug-2017 C Resubmit KHEP-SD-ME-BC4-FP-FF-002
Approved KHEP-SD-ME-BC4-FP-GF-001
Mechanical 1 Approval 15-Jan-2018 B w/ KHEP-SD-ME-BC4-FP-FF-002
comments KHEP-SD-ME-BC4-FP-RD-003
Revise & KHEP-SD-ME-BC6-FP- GF-0001
Mechanical 1 Approval 10-May-2017 C Resubmit KHEP-SD-ME-BC6-FP- FF-0002
Revise & KHEP-SD-ME-BC6-FP- GF-0001
Mechanical 1 Approval 16-Aug-2017 C Resubmit KHEP-SD-ME-BC6-FP- FF-0002
Approved KHEP-SD-ME-BC6-FP- GF-0001
Mechanical 1 Approval 15-Jan-2018 B w/ KHEP-SD-ME-BC6-FP- FF-0002
comments KHEP-SD-ME-BC6-FP- RD-0003
Revise & KHEP-SD-NE-A4-FP-GF-0001
Mechanical 1 Approval 23-May-2017 C Resubmit KHEP-SD-NE-A4-FP-GF-0002
Revise & KHEP-SD-ME-A4-FP-GF-0001
Mechanical 1 Approval 16-Aug-2017 C Resubmit KHEP-SD-ME-A4-FP-FF-0002
Approved KHEP-SD-ME-A4-FP-GF-0001
Mechanical 1 Approval 1-Feb-2018 B w/ KHEP-SD-ME-A4-FP-FF-0002
Comments KHEP-SD-ME-A4-FP-RD-0003
Approved KHEP-SD-ME-B2-BW-GF-001
Mechanical 1 Approval 11-May-2017 B w/ KHEP-SD-ME-B2-BW-FF-002
Comments KHEP-SD-ME-B2-BW-RF-003
Approved KHEP-SD-ME-B2-BW-GF-001
Mechanical 1 Approval 31-Jan-2018 B w/ KHEP-SD-ME-B2-BW-FF-002
Comments KHEP-SD-ME-B2-BW-RF-003
Approved
Mechanical 1 Approval 30-May-2017 B w/ KHEP-SD-ME-A6-BW-GF-001
Comments
Approved
KHEP-SD-ME-A6-BW-FF-002
Mechanical 1 Approval 30-May-2017 B w/
KHEP-SD-ME-A6-BW-RF-003
Comments
Approved KHEP-SD-ME-A4-BW-GF-001
Mechanical 1 Approval 30-May-2017 B w/ KHEP-SD-ME-A4-BW-FF-002
Comments KHEP-SD-ME-A4-BW-RF-003
Approved KHEP-SD-ME-BC6-BW-GF-001
Mechanical 1 Approval 25-May-2017 B w/ KHEP-SD-ME-BC6-BW-FF-002
Comments KHEP-SD-ME-BC6-BW-RF-003
Approved KHEP-SD-ME-BC6-BW-GF-001
Mechanical 1 Approval 30-Jan-2018 B w/ KHEP-SD-ME-BC6-BW-FF-002
Comments KHEP-SD-ME-BC6-BW-RF-003
Approved KHEP-SD-ME-BC4-BW-GF-001
Mechanical 1 Approval 25-May-2017 B w/ KHEP-SD-ME-BC4-BW-FF-002
Comments KHEP-SD-ME-BC4-BW-RF-003
Approved KHEP-SD-ME-BC4-BW-GF-001
Mechanical 1 Approval 30-Jan-2018 B w/ KHEP-SD-ME-BC4-BW-FF-002
Comments KHEP-SD-ME-BC4-BW-RF-003
Revise &
Mechanical 1 Approval 29-May-2017 C Resubmit
KHEP-SD-ME-B2-FP-RD-003

Revise &
Mechanical 1 Approval 15-Aug-2017 C Resubmit
KHEP-SD-ME-B2-FP-RD-003

Revise &
Mechanical 1 Approval 29-May-2017 C Resubmit
KHEP-SD-ME-BC4-FP-RD-003

Revise &
Mechanical 1 Approval 15-Aug-2017 C Resubmit
KHEP-SD-ME-BC4-FP-RD-003

Revise &
Mechanical 1 Approval 29-May-2017 C Resubmit
KHEP-SD-ME-BC6-FP-RD-003

Revise &
Mechanical 1 Approval 15-Aug-2017 C Resubmit
KHEP-SD-ME-BC6-FP-RD-003

Revise &
Mechanical 1 Approval 29-May-2017 C Resubmit
KHEP-SD-ME-A4-FP-RD-003

Revise &
Mechanical 1 Approval 15-Aug-2017 C Resubmit
KHEP-SD-ME-A4-FP-RD-003

Revise &
Mechanical 1 Approval 29-May-2017 C Resubmit
KHEP-SD-ME-A6-FP-RD-003

Revise &
Mechanical 1 Approval 15-Aug-2017 C Resubmit
KHEP-SD-ME-A6-FP-RD-003

Approved
Mechanical 1 Approval 13-Nov-2017 B w/ KHEP-SD-ME-G-001
Comments

1356DF-SD-ME-DR-B2-GF-001
Revise &
Plumbing 1 Approval 27-Feb-2017 C Resubmit
1356DF-SD-ME-DR-B2-FF-002
1356DF-SD-ME-DR-B2-RF-003
Approved 1356DF-SD-ME-DR-B2-GF-001
Plumbing 1 Approval 1-Jun-2017 B w/ 1356DF-SD-ME-DR-B2-FF-002
Comments 1356DF-SD-ME-DR-B2-RF-003
1356DF-SD-ME-WS-B2-FF-002
Revise &
Plumbing 1 Approval 2-Mar-2017 C Resubmit
1356DF-SD-ME-WS-B2-GF-001
1356DF-SD-ME-WS-B2-RF-003
Approved KHEP-SD-PL-B2-WS-GF-0001
Plumbing 1 Approval 15-Mar-2017 B w/ KHEP-SD-PL-B2-WS-GF-0002 KHEP-
Comments SD-PL-B2-WS-GF-0003
Approved
KHEP-SD-PL-A6-DRG-GF-0001
Plumbing 1 Approval 4-Apr-2017 B w/
KHEP-SD-PL-A6-DRG-FF-0002
Comments
KHEP-SD-PL-WS-A6-GF-0001
Revise &
Plumbing 1 Approval 30-Apr-2017 C Resubmit
KHEP-SD-PL-WS-A6-FF-0002 KHEP-
SD-PL-WS-A6-RF-0003
Approved KHEP-SD-PL-WS-A6-GF-0001
Plumbing 1 Approval 30-May-2017 B w/ KHEP-SD-PL-WS-A6-FF-0002 KHEP-
Comments SD-PL-WS-A6-RF-0003
KHEP-SD-PL-BC4-WS-GF-001
Revise &
Plumbing 1 Approval 1-May-2017 C Resubmit
KHEP-SD-PL-BC4-WS-FF-002
KHEP-SD-PL-BC4-WS-RF-003
KHEP-SD-PL-BC4-WS-GF-001
Revise &
Plumbing 1 Approval 4-Jun-2017 C Resubmit
KHEP-SD-PL-BC4-WS-FF-002
KHEP-SD-PL-BC4-WS-RF-003
Approved KHEP-SD-PL-BC4-WS-GF-001
Plumbing 1 Approval 13-Jun-2017 B w/ KHEP-SD-PL-BC4-WS-FF-002
Comments KHEP-SD-PL-BC4-WS-RF-003
KHEP-SD-PL-BC4-DR-GF-001
Revise &
Plumbing 1 Approval 30-Apr-2017 C Resubmit
KHEP-SD-PL-BC4-DR-FF-002
KHEP-SD-PL-BC4-DR-RF-003
Approved KHEP-SD-PL-BC4-DR-GF-001
Plumbing 1 Approval 25-May-2017 B w/ KHEP-SD-PL-BC4-DR-FF-002
Comments KHEP-SD-PL-BC4-DR-RF-003
KHEP-SD-PL-BC6-DR- GF-0001
Revise &
Plumbing 1 Approval 10-May-2017 C Resubmit
KHEP-SD-PL-BC6-DR- FF-0002
KHEP-SD-PL-BC6-DR- RF-0003
Approved KHEP-SD-PL-BC6-DR- GF-0001
Plumbing 1 Approval 4-Jun-2017 B w/ KHEP-SD-PL-BC6-DR- FF-0002
Comments KHEP-SD-PL-BC6-DR- RF-0003
KHEP-SD-PL-BC6-WS- GF-0001
Revise &
Plumbing 1 Approval 10-May-2017 C Resubmit
KHEP-SD-PL-BC6-WS- FF-0002
KHEP-SD-PL-BC6-WS- RF-0003
Approved KHEP-SD-PL-BC6-WS- GF-0001
Plumbing 1 Approval 4-Jun-2017 B w/ KHEP-SD-PL-BC6-WS- FF-0002
Comments KHEP-SD-PL-BC6-WS- RF-0003
Revise &
Plumbing 1 Approval 9-May-2017 C Resubmit
KHEP-SD-PL-A6-DR- RF-0003

Approved
Plumbing 1 Approval 3-Jul-2017 B w/ KHEP-SD-PL-A6-DR- RF-0003
Comments
Approved KHEP-SD-PL-A4-DRG-GF-0001
Plumbing 1 Approval 15-May-2017 B w/ KHEP-SD-PL-A4-DRG-GF-0002
Comments KHEP-SD-PL-A4-DRG-GF-0003
KHEP-SD-PL-A4-WS-GF-0001
Revise &
Plumbing 1 Approval 15-May-2017 C Resubmit
KHEP-SD-PL-A4-WS-FF-0002
KHEP-SD-PL-A4-WS-RF-0003
Approved KHEP-SD-PL-A4-WS-GF-0001
Plumbing 1 Approval 30-May-2017 B w/ KHEP-SD-PL-A4-WS-FF-0002
Comments KHEP-SD-PL-A4-WS-RF-0003
Approved
Plumbing 1 Approval 30-May-2017 B w/ KHEP-SD-PL-A4-WS- RD-0004
Comments
Approved
Plumbing 1 Approval 30-May-2017 B w/ KHEP-SD-PL-A6-WS- RD-0004
Comments
Approved
Plumbing 1 Approval 30-May-2017 B w/ KHEP-SD-PL-B2-WS- RD-0004
Comments
Approved
Plumbing 1 Approval 30-May-2017 B w/ KHEP-SD-PL-BC4-WS- RD-0004
Comments
Approved
Plumbing 1 Approval 30-May-2017 B w/ KHEP-SD-PL-BC6-WS- RD-0004
Comments
Revise &
Plumbing 1 Approval 30-May-2017 C Resubmit
KHEP-SD-PL-A4-DRG- RD-0004

Revise &
Plumbing 1 Approval 10-Jun-2017 C Resubmit
KHEP-SD-PL-A4-DRG- RD-0004

Approved
Plumbing 1 Approval 14-Jun-2017 B w/ KHEP-SD-PL-A4-DRG- RD-0004
Comments
Revise &
Plumbing 1 Approval 30-May-2017 C Resubmit
KHEP-SD-PL-A6-DRG- RD-0004

Revise &
Plumbing 1 Approval 10-Jun-2017 C Resubmit
KHEP-SD-PL-A6-DRG- RD-0004

Approved
Plumbing 1 Approval 14-Jun-2017 B w/ KHEP-SD-PL-A6-DRG- RD-0004
Comments
Revise &
Plumbing 1 Approval 30-May-2017 C Resubmit
KHEP-SD-PL-B2-DRG- RD-0004
Revise &
Plumbing 1 Approval 10-Jun-2017 C Resubmit
KHEP-SD-PL-B2-DRG- RD-0004

Approved
Plumbing 1 Approval 14-Jun-2017 B w/ KHEP-SD-PL-B2-DRG- RD-0004
Comments
Revise &
Plumbing 1 Approval 30-May-2017 C Resubmit
KHEP-SD-PL-BC4-DRG- RD-0004

Revise &
Plumbing 1 Approval 10-Jun-2017 C Resubmit
KHEP-SD-PL-BC4-DRG- RD-0004

Approved
Plumbing 1 Approval 14-Jun-2017 B w/ KHEP-SD-PL-BC4-DRG- RD-0004
Comments
Revise &
Plumbing 1 Approval 30-May-2017 C Resubmit
KHEP-SD-PL-BC6-DRG- RD-0004

Revise &
Plumbing 1 Approval 10-Jun-2017 C Resubmit
KHEP-SD-PL-BC6-DRG- RD-0004

Approved
Plumbing 1 Approval 14-Jun-2017 B w/ KHEP-SD-PL-BC6-DRG- RD-0004
Comments
Revise &
Plumbing 1 Approval 26-Oct-2017 C Resubmit
KHEP-SD-PL-G-001

Revise &
Plumbing 1 Approval 7-Dec-2017 C Resubmit
KHEP-SD-PL-G-001

Revise &
Plumbing 1 Approval 10-Jan-2018 C Resubmit
KHEP-SD-PL-G-001

1356DF-S-B2-GA-FD-001
Approved
1356DF-S-B2-GA-FD-SEC-002 1356DF-
Structural 1 Approval 16-Feb-2017 B w/
B2-A6-RP-FD-501 1356DF-S-
Comments
B2-RS-FD-502
1356DF-SD-ST-B2-GA-GF-003
1356DF-SD-ST-B2-GF-SEC-004 1356DF-
Revise &
Structural 1 Approval 27-Feb-2017 C Resubmit
SD-ST-B2-RP-GF-503 1356DF-SD-ST-B2-
GA-ST-010 1356DF-SD-ST-B2-RF-ST-510

KHEP-SD-ST-B2-GA-GF-003
Approved KHEP-SD-ST-B2-GF-SEC-004
Structural 1 Approval 29-Mar-2017 B w/ KHEP-SD-ST-B2--RP-GF-013
Comments KHEP-SD-ST-B2-GA-ST-010
KHEP-SD-ST-B2-RS-ST-019
Approved
KHEP-SD-ST-B2-GA-GF-003
Structural 1 Approval 20-May-2017 B w/
KHEP-SD-ST-B2-GF-SEC-004
Comments
KHEP-SD-B2-GA-GF-003
Structural 1 Approval 25-Dec-2017 A Approved KHEP-SD-B2-GF-SEC-004
KHEP-SD-B2-RP-GF-0013
Revise & 1356DF-SD-ST-A6-BR-GF-510 1356DF-
Structural 1 Approval 27-Feb-2017 C Resubmit SD-ST-A6-BR-GF-510A
Revise & KHEP-SD-ST-A6-BR-GF-019
Structural 1 Approval 30-Mar-2017 C Resubmit KHEP-SD-ST-A6-BR-GF-019A
KHEP-SD-ST-A6-BR-GF-019
Approved
KHEP-SD-ST-A6-BR-GF-019A
Structural 1 Approval 17-Apr-2017 B w/
KHEP-SD-ST-A6-BR-GF-019B
Comments
KHEP-SD-ST-A6-BR-GF-019C
Revise & KHEP-SD-ST-B2-BR-GF-020
Structural 1 Approval 1-Apr-2017 C Resubmit KHEP-SD-ST-B2-BR-GF-020A
Approved
KHEP-SD-ST-B2-BR-GF-020
Structural 1 Approval 10-Apr-2017 B w/
KHEP-SD-ST-B2-BR-GF-020A
Comments
KHEP-SD-ST-B2-GA-FF-005
Approved
KHEP-SD-ST-B2-SEC-FF-006
Structural 1 Approval 19-Mar-2017 B w/
KHEP-SD-ST-B2-RP-FF-014
Comments
KHEP-SD-ST-B2-RP-FF-015
KHEP-SD-ST-B2-GA-FF-005
KHEP-SD-ST-B2-SEC-FF-006
KHEP-SD-ST-B2-RP-FF-014
KHEP-SD-ST-B2-RP-FF-015
Approved
Resubmit
Structural 1 Approval 10-May-2017 B w/
KHEP-SD-ST-B2-GA-FF-005
Comments
KHEP-SD-ST-B2-SEC-FF-006
KHEP-SD-ST-B2-RP-FF-014
KHEP-SD-ST-B2-RP-FF-015
KHEP-SD-ST-B2-RP-FF-015A

KHEP-SD-ST-B2-GA-FF-005
Approved KHEP-SD-ST-B2-SEC-FF-006
Structural 1 Approval 20-Nov-2017 B w/ KHEP-SD-ST-B2-RP-FF-014
Comments KHEP-SD-ST-B2-RP-FF-015
KHEP-SD-ST-B2-RP-FF-015A

1356DF-S-A6-GA-FD-001
Approved
1356DF-S-A6-GA-SEC-002 1356DF-
Structural 1 Approval 9-Feb-2017 B w/
S-A6-RP-FD-501 1356DF-S-A6-
Comments
RS-FD-502
Approved
1356DF-S-A6-GA-GF-003
Structural 1 Approval 13-Feb-2017 B w/
1356DF-S-A6-RPS-GF-503
Comments
KHEP-SD-ST-A6-GA-GF-003
Structural 1 Approval 25-Dec-2017 A Approved
KHEP-SD-ST-A6-RP-GF-0012
KHEP-SD-ST-A6-R-CW1-GA-008 TO 008N
Revise &
Structural 1 Approval 23-Mar-2017 C Resubmit
KHEP-
SD-ST-A6-R-CW1-017 TO 017N
Approved
Structural 1 Approval 18-Apr-2017 B w/ KHEP-SD-ST-A6-R-CW1-017 TO017N
Comments
Structural 1 Approval 11-Jun-2017 A Approved KHEP-SD-ST-A6-R-CW1-017 TO017N
KHEP-SD-ST-B2-CW1-GA-009 TO 009K
Revise &
Structural 1 Approval 23-Mar-2017 C Resubmit
KHEP-
SD-ST-B2-R-CW1-018 TO 018K
Approved
Structural 1 Approval 12-Apr-2017 B w/ KHEP-SD-ST-B2-R-CW1-018 TO 018K
Comments
Structural 1 Approval 15-Jun-2017 A Approved KHEP-SD-ST-B2-R-CW1-018 TO 018K
Revise &
Structural 1 Approval 25-Oct-2017 C Resubmit
KHEP-SD-ST-B2-R-CW5-018K

Approved
Structural 1 Approval 12-Nov-2017 B w/ KHEP-SD-ST-B2-R-CW5-018K
Comments
Revise &
Structural 1 Approval 29-Mar-2017 C Resubmit
KHEP-SD-ST-A6-FF-BR-021

KHEP-SD-ST-A6-FF-BR-021
Revise & KHEP-SD-ST-A6-FF-BR-022
Structural 1 Approval 1-Jun-2017 C Resubmit KHEP-SD-ST-A6-FF-BR-023

KHEP-SD-ST-A6-FF-BR-021
KHEP-SD-ST-A6-FF-BR-022
Structural 1 Approval 8-Jun-2017 A Approved
KHEP-SD-ST-A6-FF-BR-023

KHEP-SD-ST-A6-GA-FF-004
Revise &
Structural 1 Approval 29-Mar-2017 C Resubmit
KHEP-SD-ST-A6-RS-FF-013
KHEP-SD-ST-A6-RP-FF-014
Approved KHEP-SD-ST-A6-GA-FF-004
Structural 1 Approval 8-Jun-2017 B w/ KHEP-SD-ST-A6-RS-FF-013
Comments KHEP-SD-ST-A6-RP-FF-014
Revise &
Structural 1 Approval 30-Mar-2017 C Resubmit
KHEP-SD-ST-B2-BR-FF-021

Approved
Structural 1 Approval 6-May-2017 B w/ KHEP-SD-ST-B2-BR-FF-021
Comments
KHEP-SD-ST-BC4-GA-FD-001
KHEP-SD-ST-BC4-SEC-FD-002
Revise &
Structural 1 Approval 10-Apr-2017 C Resubmit
KHEP-SD-ST-BC4-RP-FD-001
KHEP-SD-ST-BC4-RS-FD-002

KHEP-SD-ST-BC4-GA-FD-001
Revise & KHEP-SD-ST-BC4-SEC-FD-002
Structural 1 Approval 22-Apr-2017 C Resubmit KHEP-SD-ST-BC4-RP-FD-001
KHEP-SD-ST-BC4-RS-FD-002
KHEP-SD-ST-BC4-GA-FD-001
KHEP-SD-ST-BC4-SEC-FD-002
Structural 1 Approval 26-Apr-2017 A Approved
KHEP-SD-ST-BC4-RP-FD-001
KHEP-SD-ST-BC4-RS-FD-002
KHEP-SD-ST-BC6-GA-FD-001
KHEP-SD-ST-BC6-SEC-FD-002
Revise &
Structural 1 Approval 12-Apr-2017 C Resubmit
KHEP-SD-ST-BC6-RP-FD-011
KHEP-SD-ST-BC6-RS-FD-012

KHEP-SD-ST-BC6-GA-FD-001
Approved
KHEP-SD-ST-BC6-SEC-FD-002
Structural 1 Approval 23-Apr-2017 B w/
KHEP-SD-ST-BC6-RP-FD-011
Comments
KHEP-SD-ST-BC6-RS-FD-012
KHEP-SD-ST-A4-GA-FD-001
Revise & KHEP-SD-ST-A4-SEC-FD-002
Structural 1 Approval 13-Apr-2017 C Resubmit KHEP-SD-ST-A4-RP-FD-011 KHEP-
SD-ST-A4-RS-FD-012
KHEP-SD-ST-A4-GA-FD-001
Revise & KHEP-SD-ST-A4-SEC-FD-002
Structural 1 Approval 7-May-2017 C Resubmit KHEP-SD-ST-A4-RP-FD-011 KHEP-
SD-ST-A4-RS-FD-012

KHEP-SD-ST-A4-GA-FD-001
Approved
KHEP-SD-ST-A4-SEC-FD-002
Structural 1 Approval 25-May-2017 B w/
KHEP-SD-ST-A4-RP-FD-011
Comments
KHEP-SD-ST-A4-R9-FD-012

KHEP-SD-ST-BC4-GA-GF-003
Approved
KHEP-SD-ST-BC4-SEC-GF-004
Structural 1 Approval 4-May-2017 B w/
KHEP-SD-ST-BC4-RP-GF-013
Comments
KHEP-SD-ST-BC4-RS-GF-014
KHEP-SD-ST-BC4-GA-GF-003
Approved KHEP-SD-ST-BC4-SEC-GF-004
Structural 1 Approval 4-Jun-2017 B w/ KHEP-SD-ST-BC4-RP-GF-013
Comments KHEP-SD-ST-BC4-RS-GF-014

KHEP-SD-ST-BC4-GA-GF-003
KHEP-SD-ST-BC4-SEC-GF-004
Structural 1 Approval 27-Jul-2017 A Approved KHEP-SD-ST-BC4-RP-GF-013
KHEP-SD-ST-BC4-RS-GF-014

KHEP-SD-ST-BC4-GA-GF-003
KHEP-SD-ST-BC4-SEC-GF-004
Revise &
Structural 1 Approval 1-Jan-2018 C Resubmit
KHEP-SD-ST-BC4-RP-GF-013
KHEP-SD-ST-BC4-RS-GF-014

Approved KHEP-SD-ST-A6-GA-ST1 TO 4-009


Structural 1 Approval 7-May-2017 B w/ KHEP-SD-ST-A6-RS-ST1 TO 4-018
Comments
KHEP-SD-ST-A6-GA-ST1 TO 4-009
Structural 1 Approval 20-Jul-2017 A Approved KHEP-SD-ST-A6-RS-ST1 TO 4-018
Revise &
Structural 1 Approval 9-May-2017 C Resubmit
KHEP-SD-ST-BC4-R-CW1-019 TO 019I

Revise &
Structural 1 Approval 23-May-2017 C Resubmit
KHEP-SD-ST-BC4-R-CW1-019 TO 019I

Structural 1 Approval 13-Jun-2017 A Approved KHEP-SD-ST-BC4-R-CW1-019 TO 019I

Approved
Structural 1 Approval 7-Nov-2017 B w/ KHEP-SD-ST-BC4-R-CW5-019H
Comments

Approved
Structural 1 Approval 14-May-2017 B w/ KHEP-SD-ST-BC6-R-CW1-019 TO 019I
Comments

Structural 1 Approval 15-Jun-2017 A Approved KHEP-SD-ST-BC6-R-CW1-019 TO 019I

Approved
Structural 1 Approval 7-Nov-2017 B w/ KHEP-SD-ST-BC6-R-CW5-019H
Comments

KHEP-SD-ST-BC4-GA-RF-006
Approved KHEP-SD-ST-BC4-RP-RS-017
Structural 1 Approval 25-May-2017 B w/ KHEP-SD-ST-BC4-RP-RS-018
Comments KHEP-SD-ST-BC4-RP-RS-018A

KHEP-SD-ST-A4-GA-RF-006
Approved
KHEP-SD-ST-A4-RP-RS-017
Structural 1 Approval 25-May-2017 B w/
KHEP-SD-ST-A4-RP-RS-018
Comments
KHEP-SD-ST-A4-RP-RS-018A

KHEP-SD-ST-A4-GA-RF-006
Revise & KHEP-SD-ST-A4-RP-RS-017
Structural 1 Approval 19-Feb-2018 C Resubmit KHEP-SD-ST-A4-RP-RS-018
KHEP-SD-ST-A4-RP-RS-018A

Approved KHEP-SD-ST-A6-GA-RF-006
Structural 1 Approval 25-May-2017 B w/ KHEP-SD-ST-A6-RP-RF-015
Comments KHEP-SD-ST-A6-RP-RF-016

KHEP-SD-ST-A6-GA-RF-006
Structural 1 Approval KHEP-SD-ST-A6-RP-RF-015
KHEP-SD-ST-A6-RP-RF-016

Revise &
Structural 1 Approval 23-May-2017 C Resubmit
KHEP-SD-ST-A4-R-CW1-019 TO 019L

Structural 1 Approval 13-Jun-2017 A Approved KHEP-SD-ST-A4-R-CW1-019 TO 019L


KHEP-SD-ST-B2-GA-RF-007
KHEP-SD-ST-B2-SEC-RF-008
Revise & KHEP-SD-ST-B2-RP-RF-016
Structural 1 Approval 24-May-2017 C Resubmit KHEP-SD-ST-B2-RS-RF-017
KHEP-SD-ST-B2-RS-RF-017A

KHEP-SD-ST-B2-GA-RF-007
Approved KHEP-SD-ST-B2-SEC-RF-008
Structural 1 Approval 7-Jun-2017 B w/ KHEP-SD-ST-B2-RP-RF-016
Comments KHEP-SD-ST-B2-RS-RF-017
KHEP-SD-ST-B2-RS-RF-017A

KHEP-SD-ST-B2-GA-RF-007
KHEP-SD-ST-B2-SEC-RF-008
Revise &
Structural 1 Approval 26-Oct-2017 C Resubmit
KHEP-SD-ST-B2-RP-RF-016
KHEP-SD-ST-B2-RS-RF-017
KHEP-SD-ST-B2-RS-RF-017A

KHEP-SD-ST-B2-GA-RF-007
KHEP-SD-ST-B2-SEC-RF-008
Revise &
Structural 1 Approval 22-Nov-2017 C Resubmit
KHEP-SD-ST-B2-RP-RF-016
KHEP-SD-ST-B2-RS-RF-017
KHEP-SD-ST-B2-RS-RF-017A

Revise &
Structural 1 Approval 24-May-2017 C Resubmit
KHEP-SD-ST-B2-RF-BR-023

Approved
Structural 1 Approval .. B w/ KHEP-SD-ST-B2-RF-BR-023
Comments
Approved
KHEP-SD-ST-BC6-FF-BR-022
Structural 1 Approval 25-May-2017 B w/
KHEP-SD-ST-BC6-FF-BR-022A
Comments
KHEP-SD-ST-BC6-GA-GF-003
Revise &
Structural 1 Approval 13-Jun-2017 C Resubmit
KHEP-SD-ST-BC6-RP-GF-013

Approved KHEP-SD-ST-BC6-GA-GF-003
Structural 1 Approval 20-Jul-2017 B w/ KHEP-SD-ST-BC6-RP-GF-013
Comments
KHEP-SD-ST-BC6-GA-GF-003
Revise &
Structural 1 Approval 1-Jan-2018 C Resubmit
KHEP-SD-ST-BC6-RP-GF-013

KHEP-SD-ST-BC6-GA-ST-010
Revise &
Structural 1 Approval 4-Jun-2017 C Resubmit
KHEP-SD-ST-BC6-ST-RS-020

KHEP-SD-ST-BC6-GA-ST-010
Structural 1 Approval 13-Jun-2017 A Approved KHEP-SD-ST-BC6-ST-RS-020

Revise & KHEP-SD-ST-BC4-GA-ST-010


Structural 1 Approval 4-Jun-2017 C Resubmit KHEP-SD-ST-BC4-ST-RS-020
KHEP-SD-ST-BC4-GA-ST-010
Structural 1 Approval 13-Jun-2017 A Approved
KHEP-SD-ST-BC4-ST-RS-020

Approved KHEP-SD-ST-A4-GA-ST-010
Structural 1 Approval 4-Jun-2017 B w/ KHEP-SD-ST-A4-ST-RS-020
Comments

Revise & KHEP-SD-ST-A4-GA-GF-003


Structural 1 Approval 6-Jun-2017 C Resubmit KHEP-SD-ST-A4-RP-GF-013

KHEP-SD-ST-A4-GA-GF-003
Structural 1 Approval 5-Jul-2017 A Approved
KHEP-SD-ST-A4-RP-GF-013

Revise & KHEP-SD-ST-A4-GA-GF-003


Structural 1 Approval 1-Jan-2018 C Resubmit KHEP-SD-ST-A4-RP-GF-013

Approved KHEP-SD-ST-BC4-GF-BR-021
Structural 1 Approval 19-Jun-2017 B w/ KHEP-SD-ST-BC4-GF-BR-021A
Comments
Approved KHEP-SD-ST-A4-GF-BR-021
Structural 1 Approval 19-Jun-2017 B w/ KHEP-SD-ST-A4-GF-BR-021A
Comments
Approved KHEP-SD-ST-BC6-GF-BR-021
Structural 1 Approval 4-Jul-2017 B w/ KHEP-SD-ST-BC6-GF-BR-021A
Comments
KHEP-SD-ST-AB-GA-FD-001
Structural 1 Approval 10-Jul-2017 A Approved KHEP-SD-ST-AB-RP-FD-004

KHEP-SD-ST-PT-GA-FD-001
KHEP-SD-ST-PT-RP-FD-004 KHEP-SD-ST-
Structural 1 Approval 12-Aug-2017 A Approved
PT-R-C-004

KHEP-SD-ST-PTA-GA-FD-001
KHEP-SD-ST-PTA-RP-FD-004
Structural 1 Approval 7-Aug-2017 E Rejected
KHEP-SD-ST-PTA-R-C-007

KHEP-SD-ST-PTA-GA-FD-001
Revise & KHEP-SD-ST-PTA-RP-FD-004
Structural 1 Approval 8-Nov-2017 C Resubmit KHEP-SD-ST-PTA-R-C-007

KHEP-SD-ST-PTA-GA-FD-001
Approved
KHEP-SD-ST-PTA-RP-FD-004
Structural 1 Approval 28-Nov-2017 B w/
KHEP-SD-ST-PTA-R-C-007
Comments

Approved
Structural 1 Approval 31-Jul-2017 B w/ KHEP-SD-ST-PT-R-C-007
Comments
KHEP-SD-ST-AB-GA-RF-003
Revise &
Structural 1 Approval 21-Sep-2017 C Resubmit
KHEP-SD-ST-AB-RP-RF-006

KHEP-SD-ST-A6-RF-BR-024
Revise & KHEP-SD-ST-A6-RF-BR-025
Structural 1 Approval 22-Jul-2017 C Resubmit KHEP-SD-ST-A6-RF-BR-026

KHEP-SD-ST-A6-RF-BR-024
Revise & KHEP-SD-ST-A6-RF-BR-025
Structural 1 Approval 10-Aug-2017 C Resubmit KHEP-SD-ST-A6-RF-BR-026

KHEP-SD-ST-A6-RF-BR-024
Revise & KHEP-SD-ST-A6-RF-BR-025
Structural 1 Approval 24-Aug-2017 C Resubmit KHEP-SD-ST-A6-RF-BR-026

KHEP-SD-ST-A6-RF-BR-024
Approved
KHEP-SD-ST-A6-RF-BR-025
Structural 1 Approval 12-Sep-2017 B w/
KHEP-SD-ST-A6-RF-BR-026
Comments
Revise & KHEP-SD-ST-PT-GA-RF-003
Structural 1 Approval 7-Aug-2017 C Resubmit KHEP-SD-ST-PT-RP-RF-006

Approved
Structural 1 Approval 7-Aug-2017 B w/ KHEP-SD-ST-PT-BR-RF-009
Comments

KHEP-SD-ST-AB-GA-GF-002
Revise &
Structural 1 Approval 1-Aug-2017 C Resubmit
KHEP-SD-ST-AB-RP-GF-005

Approved
Structural 1 Approval 31-Jul-2017 B w/ KHEP-SD-ST-AB-GF-BR-008
Comments
KHEP-SD-ST-BC4-GA-FF-005
KHEP-SD-ST-BC4-RP-FF-015
Revise &
Structural 1 Approval 2-Aug-2017 C Resubmit
KHEP-SD-ST-BC4-RP-FF-016
KHEP-SD-ST-BC4-RS-FF-016A

KHEP-SD-ST-BC4-GA-FF-005
KHEP-SD-ST-BC4-RP-FF-015
Revise &
Structural 1 Approval 3-Oct-2017 C Resubmit
KHEP-SD-ST-BC4-RP-FF-016
KHEP-SD-ST-BC4-RS-FF-016A

KHEP-SD-ST-BC4-GA-FF-005
KHEP-SD-ST-BC4-RP-FF-015
Structural 1 Approval 15-Oct-2017 A Approved KHEP-SD-ST-BC4-RP-FF-016
KHEP-SD-ST-BC4-RS-FF-016A

Approved KHEP-SD-ST-BC4-FF-BR-022
Structural 1 Approval 2-Aug-2017 B w/ KHEP-SD-ST-BC4-FF-BR-022A
Comments

KHEP-SD-ST-PTA-GA-GF-002
Revise &
Structural 1 Approval 10-Aug-2017 C Resubmit
KHEP-SD-ST-PTA-RP-GF-005

Structural 1 Approval 10-Aug-2017 A Approved KHEP-SD-ST-PTA-GF-BR-008

KHEP-SD-ST-PT-GA-GF-002
Structural 1 Approval 9-Aug-2017 A Approved KHEP-SD-ST-PT-RP-GF-005

Revise &
Structural 1 Approval 9-Aug-2017 C Resubmit
KHEP-SD-ST-PT-GF-BR-008

KHEP-SD-ST-BC6-GA-FF-004
Revise & KHEP-SD-ST-BC6-RS-FF-014
Structural 1 Approval 7-Aug-2017 C Resubmit KHEP-SD-ST-BC6-RP-FF-015

KHEP-SD-ST-BC6-GA-FF-004
KHEP-SD-ST-BC6-RS-FF-014
Structural 1 Approval 24-Oct-2017 A Approved
KHEP-SD-ST-BC6-RP-FF-015

Approved KHEP-SD-ST-PTA-GA-RF-003
Structural 1 Approval 10-Aug-2017 B w/ KHEP-SD-ST-PTA-RP-RF-006
Comments

KHEP-SD-ST-A4-GA-FF-004
KHEP-SD-ST-A4-SEC-FF-005
Revise & KHEP-SD-ST-A4-RP-FF-014
Structural 1 Approval 7-Aug-2017 C Resubmit KHEP-SD-ST-A4-RP-FF-015
KHEP-SD-ST-A4-RS-FF-016

KHEP-SD-ST-A4-GA-FF-004
KHEP-SD-ST-A4-SEC-FF-005
Approved
KHEP-SD-ST-A4-RP-FF-014
Structural 1 Approval 15-Oct-2017 B w/
KHEP-SD-ST-A4-RP-FF-015
Comments
KHEP-SD-ST-A4-RS-FF-016
KHEP-SD-ST-A4-FF-BR-022
Revise & KHEP-SD-ST-A4-FF-BR-022A
Structural 1 Approval 15-Aug-2017 C Resubmit KHEP-SD-ST-A4-FF-BR-022B

KHEP-SD-ST-A4-FF-BR-022
KHEP-SD-ST-A4-FF-BR-022A
Structural 1 Approval 24-Oct-2017 A Approved
KHEP-SD-ST-A4-FF-BR-022B

Revise &
Structural 1 Approval 3-Oct-2017 C Resubmit
KHEP-SD-ST-BC4-RF-BR-023

Structural 1 Approval 14-Oct-2017 A Approved KHEP-SD-ST-BC4-RF-BR-023

Approved
Structural 1 Approval 22-Jan-2018 B w/ KHEP-SD-ST-BC4-RF-BR-023
Comments
Approved
Structural 1 Approval 20-Feb-2018 B w/ KHEP-SD-ST-BC4-RF-BR-023
Comments
KHEP-SD-ST-A4-RF-BR-023
Revise &
Structural 1 Approval 10-Oct-2017 C Resubmit
KHEP-SD-ST-A4-RF-BR-024

Revise &
Structural 1 Approval 15-Oct-2017 C Resubmit
KHEP-SD-ST-BC6-RF-BR-023

Structural 1 Approval 6-Nov-2017 A Approved KHEP-SD-ST-BC6-RF-BR-023

KHEP-SD-ST-BC6-GA-RF-005
Structural 1 Approval KHEP-SD-ST-BC6-GA-RF-016
KHEP-SD-ST-BC6-GA-RF-017

KHEP-SD-CO-A4-GF-001
Other 1 Approval 23-Jul-2017 E Rejected
KHEP-SD-CO-A4-FF-001
Revise & KHEP-SD-CO-A4-GF-001
Other 1 Approval 30-Aug-2017 C Resubmit KHEP-SD-CO-A4-FF-001
KHEP-SD-CO-A6-GF-001 KHEP-
Other 1 Approval 23-Jul-2017 E Rejected
SD-CO-A6-FF-001
Revise & KHEP-SD-CO-A6-GF-001 KHEP-
Other 1 Approval 30-Aug-2017 C Resubmit SD-CO-A6-FF-001
KHEP-SD-CO-B2-GF-001 KHEP-
Other 1 Approval 23-Jul-2017 E Rejected
SD-CO-B2-FF-001
Revise & KHEP-SD-CO-B2-GF-001 KHEP-
Other 1 Approval 30-Aug-2017 C Resubmit SD-CO-B2-FF-001
KHEP-SD-CO-BC4-GF-001 KHEP-SD-
Other 1 Approval 23-Jul-2017 E Rejected
CO-BC4-FF-001
Revise & KHEP-SD-CO-BC4-GF-001 KHEP-SD-
Other 1 Approval 30-Aug-2017 C Resubmit CO-BC4-FF-001
KHEP-SD-CO-BC6-GF-001 KHEP-SD-
Other 1 Approval 23-Jul-2017 E Rejected
CO-BC6-FF-001
Revise & KHEP-SD-CO-BC6-GF-001 KHEP-SD-
Other 1 Approval 30-Aug-2017 C Resubmit CO-BC6-FF-001
REMARKS COMMENTS

Closed

Closed

Closed

Closed

Closed

Closed

Open

Closed

Closed

Closed

Closed

Open

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed
Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed
Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed
Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed
Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Open

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed
Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed
Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed
Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Open

Closed

Closed

Closed
Closed

Closed

Closed

Open

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed
Closed

Closed

Closed

Closed

Closed

Closed

Closed
Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed
Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed
Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed
Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed
Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed
Closed

Closed

Closed

Closed

Closed

Closed

Closed

Open

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed
Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed
Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed
Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed
Closed

Closed

Closed

Closed

Closed
Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed
Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed
Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed
Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed
Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed
Closed

Closed

Closed

Closed

Closed

Closed

Closed

Open

Closed

Open
Closed
Open

Closed

Open

Closed

Open

Closed
Closed

Closed

Closed
Closed

Closed

Closed
Closed

Closed

Closed

Closed

Closed
Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed
Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed
Closed
Closed
Closed

Closed

Closed

Closed
Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed
Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed
Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed
Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed
Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed
Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed
Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Open

Closed

Closed
Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed
Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed
Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed
Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Open

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed
SR NO REQUEST FOR CLARIFICATION NO. ACTIVITIES / INSPECTION ITEMS SUBMITTED DATE

ARCHITECTURAL
Door Type Conflict between Door Schedule and Floor
0001 KHEP-RFC-AR-0001-00 19-Feb-2017
Plan drawing in all Cluster
0002 KHEP-RFC-AR-0002-00 Cluster A4 & A6 Stair Steps Modification 26-Feb-2017
0003 KHEP-RFC-AR-0003-00 Cluster A4 & A6 Column Modification 27-Feb-2017

0004 KHEP-RFC-AR-0004-00 Beam & Louver Conflict in all Clusters 2-Mar-2017

0005 KHEP-RFC-AR-0005-00 Waterproofing & Floor Finishing at Balcony in all Clusters 7-Mar-2017

0005.1 KHEP-RFC-AR-0005-01 Waterproofing & Floor Finishing at Balcony in all Clusters 10-Aug-2017

0006 KHEP-RFC-AR-0006-00 Replacing Wall Type from EW-10 to EW-7 in all clusters 8-Feb-2017

Revision of Window Schedule W12 by reducing height in


0007 KHEP-RFC-AR-0007-00 8-Feb-2017
cluster B2, BC4 & BC6

0008 KHEP-RFC-AR-0008-00 Door Discrepancies 18-Mar-2017

Architectural Floor Plan and Elevation Discrepancies in


0009 KHEP-RFC-AR-0009-00 11-Feb-2017
all Clusters
Architectural Floor Plan and Elevation Discrepancies in
0009.1 KHEP-RFC-AR-0009-01 12-Mar-2017
all Clusters
Ceiling Height Adjustment of En-Suite GF-06A in Cluster
0010 KHEP-RFC-AR-0010-00 18-Mar-2017
Bb, BC4 & BC6

0011 KHEP-RFC-AR-0011-00 Fire Rated Doors 27-Mar-2017

0012 KHEP-RFC-AR-0012-00 Ceiling clashes with doors & windows for cluster A4 & A6 23-Apr-2017

0012.1 KHEP-RFC-AR-0012-01 Ceiling clashes with doors & windows for cluster A4 & A6 14-May-2017

0012.2 KHEP-RFC-AR-0012-02 Ceiling clashes with doors & windows for cluster A4 & A6 6-Jun-2017

Ceiling clashes with doors & windows for cluster B2,BC4


0013 KHEP-RFC-AR-0013-00 23-Apr-2017
& BC6
Ceiling clashes with doors & windows for cluster B2,BC4
0013.1 KHEP-RFC-AR-0013-01 14-May-2017
& BC6
Ceiling clashes with doors & windows for cluster B2,BC4
0013.2 KHEP-RFC-AR-0013-02 6-Jun-2017
& BC6
0014 KHEP-RFC-AR-0014-00 Type & Location of Shower for All Cluster 22-May-2017

0015 KHEP-RFC-AR-0015-00 Wet Area Waterproofing System for All Clusters 23-May-2017

0016 KHEP-RFC-AR-0016-00 Dimension of Boundary gate for all clusters 15-Jun-2017

0016.1 KHEP-RFC-AR-0016-01 Backyard Galvanized Steel Gate for All Cluster 16-Nov-2017

Conflict Between Window, Rear Elevation & First Floor


0017 KHEP-RFC-AR-0017-00 17-Jun-2017
Plan - (Cluster A4 & A6)

0018 KHEP-RFC-AR-0018-00 Balcony Drain Pipe (All Cluster) 2-Jul-2017

0019 KHEP-RFC-AR-0019-00 Public Toilets & Ancillary Building Roof Slab Thickness 9-Jul-2017

0020 KHEP-RFC-AR-0020-00 Clash Between Drainage Pipes and Kitchen Wall 24-Jul-2017

0021 KHEP-RFC-AR-0021-00 Public Toilets Reflected Ceiling 26-Jul-2017


0021.1 KHEP-RFC-AR-0021-01 Public Toilets Reflected Ceiling 9-Aug-2017

Clash between gypsum wall, column & beam at staircase


0022 KHEP-RFC-AR-0022-00 19-Sep-2017
area
0023 KHEP-RFC-AR-0023-00 Drainage Panel for Roof and Balcony 20-Sep-2017

0024 KHEP-RFC-AR-0024-00 Proposal to Change the Layers of wall type 7 - General 21-Sep-2017

Proposal to Change the Layers of wall type 7 & 10 - (All


0024.1 KHEP-RFC-AR-0024-01 8-Nov-2017
Clusters)
Proposal to Change the Layers of wall type 7 & 10 - (All
0025 KHEP-RFC-AR-0025-00 9-Oct-2017
Clusters)

0026 KHEP-RFC-AR-0026-00 Balcony Water proofing System for All Clusters 11-Oct-2017

0027 KHEP-RFC-AR-0027-00 Disabilities Requirements in 5 Town houses 8-Nov-2017

0028 KHEP-RFC-AR-0028-00 Reinforcing Bars Spacing & Grout Filling for Block Works 13-Nov-2017

0029 KHEP-RFC-AR-0029-00 Rope Hook at Roof Deck 20-Nov-2017

0030 KHEP-RFC-AR-0030-00 Green Color Paint at Family & Living Area 20-Nov-2017

0030.1 KHEP-RFC-AR-0030-01 Selection of Interior Oain Colour Sample 28-Dec-2017

0031 KHEP-RFC-AR-0031-00 Decreasing Kitchen Window Sill 23-Nov-2017

0032 KHEP-RFC-AR-0032-00 Discrepancy of wall type - 7 7-Dec-2017

Loose Cement Tile for Maintenance Footpath at all


0033 KHEP-RFC-AR-0033-00 7-Dec-2017
Cluster's & Services Building Roof plan
Maintenance Access to Roof for PT, PTA & Ancillary
0034 KHEP-RFC-AR-0034-00 7-Dec-2017
Building
Maintenance Access to Roof for PT, PTA & Ancillary
0034.1 KHEP-RFC-AR-0034-01 16-Dec-2017
Building
0035 KHEP-RFC-AR-0035-00 Addition Requirements to all Clusters 10-Dec-2017

0036 KHEP-RFC-AR-0036-00 Door Hardware's Special Requirements by End User 16-Dec-2017

0037 KHEP-RFC-AR-0037-00 Wet Area Clean Out Locations 16-Dec-2017

0038 KHEP-RFC-AR-0038-00 Door Type 5 at Cluster B2 Flex Room En-Suite 16-Dec-2017

0039 KHEP-RFC-AR-0039-00 Balcony Water proofing System 27-Dec-2017


Removing Telecom Room from Public Toilet & Public
0040 KHEP-RFC-AR-0040-00 28-Dec-2017
Toilet A
Removing Telecom Room from Public Toilet & Public
0040.1 KHEP-RFC-AR-0040-01 25-Jan-2018
Toilet A

0041 KHEP-RFC-AR-0041-00 Kitchen Additional Requirement Dish Washer 28-Dec-2017

Gypsum Board Partition Wall Extended up to Concrete


0042 KHEP-RFC-AR-0042-00 7-Jan-2018
Ceiling Soffit
Gypsum Board Partition Wall Extended up to Concrete
0042.1 KHEP-RFC-AR-0042-01 15-Feb-2018
Ceiling Soffit

0043 KHEP-RFC-AR-0043-00 Modification of Door Type D02 9-Jan-2018

0044 KHEP-RFC-AR-0044-00 Terracotta Elevation Area 13-Jan-2018

0044.1 KHEP-RFC-AR-0044-01 Terracotta Elevation Area 15-Feb-2018

0045 KHEP-RFC-AR-0045-00 Public Toilets Pedestal Wall for Water Closet Flush Tank 24-Jan-2018

0046 KHEP-RFC-AR-0046-00 Cove Ceiling Width Modification 1-Feb-2018

Clashing Between Ceiling & Water Heater at Ancillary


0047 KHEP-RFC-AR-0047-00 15-Feb-2018
Building
0048 KHEP-RFC-AR-0048-00 Proposed Lintel Beam above Garage Door 15-Feb-2018
0049 KHEP-RFC-AR-0049-00 FCU Ceiling Access Door All Cluster 20-Feb-2018

CIVIL
0001 KHEP-RFC-33-0001-00 Request for Clarificationf of Sewer System 15-Jan-2017

0001.1 KHEP-RFC-33-0001-01 Request for Clarificationf of Sewer System 24-Jan-2017

0002 KHEP-RFC-CI-0002-00 Outfall Manholes - Storm Water Drainage 20-Feb-2017

0003 KHEP-RFC-CI-0003-00 Proposed waive MH-28 7-Mar-2017

0004 KHEP-RFC-CI-0004-00 BOX CULVERT 14-Mar-2017

0005 KHEP-RFC-CI-0005-00 New Position of Manholes 18-Mar-2017


0006 KHEP-RFC-CI-0006-00 Section 33 3111 Sanitary Utility sewerage Piping 22-Mar-2017

0007 KHEP-RFC-CI-0007-00 Proposal GPR Manholes & Inspection Chamber 22-Mar-2017

0007.1 KHEP-RFC-CI-0007-01 Proposal GPR Manholes & Inspection Chamber 10-Aug-2017


0008 KHEP-RFC-CI-0008-00 HDPE Pipe for potable & fire network system 22-Mar-2017
0009 KHEP-RFC-CI-0009-00 Modification of Sewer Line. 1-Apr-2017

0010 KHEP-RFC-CI-0010-00 Retention Ponds 6-Apr-2017

0011 KHEP-RFC-CI-0011-00 External Protection For Sewer Manholes 13-Apr-2017


0012 KHEP-RFC-CI-0012-00 Valve for Potable Network System 15-Apr-2017
0013 KHEP-RFC-CI-0013-00 Type of fire hydrant 15-Apr-2017
0014 KHEP-RFC-CI-0014-00 Subbase of the Alley Road 22-Apr-2017
0015 KHEP-RFC-CI-0015-00 Thrust block for horizontal bend 11-May-2017
0016 KHEP-RFC-CI-0016-00 House Connection Valves 11-May-2017

0017 KHEP-RFC-CI-0017-00 Encasement of the Storm Pipes Line 20-May-2017

0018 KHEP-RFC-CI-0018-00 Change the Invert Level of Storm Line 20-May-2017

0019 KHEP-RFC-CI-0019-00 Desert Hatch & Desert Planting Area 29-May-2017


0020 KHEP-RFC-CI-0020-00 Clash With back Drop Manhole 30-May-2017

0021 KHEP-RFC-CI-0021-00 Interlocks for Alleys 10-Jun-2017

0021.1 KHEP-RFC-CI-0021-01 Interlocks for Alleys 19-Sep-2017

0022 KHEP-RFC-CI-0022-00 Potable Water - Puddle Flange 17-Jun-2017

0023 KHEP-RFC-CI-0023-00 Working Pressure for potable & Fire Fighting Network 4-Jul-2017

0024 KHEP-RFC-CI-0024-00 Air Release Valve 9-Jul-2017

0025 KHEP-RFC-CI-0025-00 Insulation Board Under Protection Slab 13-Jul-2017

Separating Irrigation and Potable Networks at Tie in


0026 KHEP-RFC-CI-0026-00 26-Jul-2017
Point

0027 KHEP-RFC-CI-0027-00 Water Stops for Storm manholes 6-Aug-2017

0028 KHEP-RFC-CI-0028-00 Outfall for Storm Drainage System 13-Aug-2017

0029 KHEP-RFC-CI-0029-00 HDPE Fittings 21-Sep-2017

0029.1 KHEP-RFC-CI-0029-01 HDPE Fittings 2-Oct-2017

0030 KHEP-RFC-CI-0030-00 FFL - C41 and C42 21-Sep-2017


0031 KHEP-RFC-CI-0031-00 Shifting Catch basin 23-Oct-2017

0032 KHEP-RFC-CI-0032-00 Tie Inn Information 5-Nov-2017


Temporary Water Connection From Fire Hydrant FH 405
0033 KHEP-RFC-CI-0033-00 25-Dec-2017
to Al-Bawani Site
Temporary Water Connection From Fire Hydrant FH 405
0033.1 KHEP-RFC-CI-0033-01 11-Jan-2018
to Al-Bawani Site
0034 KHEP-RFC-CI-0034-00 Storm & Sewer Cover Frames 2-Jan-2018

0035 KHEP-RFC-CI-0035-00 Transition Area at Intersections 15-Jan-2018

0036 KHEP-RFC-CI-0036-00 Open Channel Crossing at Road 04 25-Jan-2018

0037 KHEP-RFC-CI-0037-00 Change cast in Situ to Precast 28-Jan-2018

0038 KHEP-RFC-CI-0038-00 Catch Basin CB Elbows 28-Jan-2018

0039 KHEP-RFC-CI-0039-00 HYDRA Seeds 29-Jan-2018

0040 KHEP-RFC-CI-0040-00 Irrigation Network 29-Jan-2018

0041 KHEP-RFC-CI-0041-00 Concrete Support for Rope Hook 15-Feb-2018

ELECTRICAL
0001 KHEP-RFC-EL-0001-00 Cluster A6 Grounding system 14-Feb-2017
0002 KHEP-RFC-EL-0002-00 Fire Alarm System Interface with HVAC System 19-Feb-2017
0003 KHEP-RFC-EL-0003-00 Fire Alarm System Interface with HVAC System 19-Feb-2017
0003.1 KHEP-RFC-EL-0003-01 Telecom Service Manhole - Type 21-Feb-2017
0004 KHEP-RFC-EL-0004-00 B2- GF Floor-Earthing Of Communication System 28-Feb-2017

0005 KHEP-RFC-EL-0005-00 B2- Circuit Designation For FCU-GF-03 & 04 28-Feb-2017

MV Cable Below road- Concrete encased ductbank


0006 KHEP-RFC-EL-0006-00 2-Mar-2017
requirement
MV Cable Below road- Concrete encased ductbank
0007 KHEP-RFC-EL-0007-00 14-Mar-2017
requirement
0008 KHEP-RFC-EL-0008-00 Grounding Cable Requirement 8-Feb-2017

0009 KHEP-RFC-EL-0009-00 Busbar Color Identification 22-Mar-2017

0010 KHEP-RFC-EL-0010-00 Feeder Size Reduction 22-Mar-2017

Missing drawing- LV Single Line Diagram of SS-L2-1 &


0011 KHEP-RFC-EL-0011-00 22-Mar-2017
SS-L4-1
General-Discrepancy between fire alarm design drawing
0012 KHEP-RFC-EL-0012-00 30-Mar-2017
& Kaust Specification
0013 KHEP-RFC-EL-0013-00 Power For Irrigation System 13-Apr-2017
0014 KHEP-RFC-EL-0014-00 Two hole lug 25-Apr-2017

0015 KHEP-RFC-EL-0015-00 Power cable resize for infrastructure 2-May-2017

0016 KHEP-RFC-EL-0016-00 Adjacent Switches Installation 22-May-2017

Bending Radius - 110mm Upvc Elbow for Electrical


0017 KHEP-RFC-EL-0017-00 14-Jun-2017
Underground duct (from KWHR to LPP panel)
0018 KHEP-RFC-EL-0018-00 Fire Alarm Interface with HVAC System 14-Jun-2017

0019 KHEP-RFC-EL-0019-00 Armounring for LS0H Outer Sheathed Cables 19-Jun-2017

Ancillary Building - Shifting of Device & Fixtures from


0020 KHEP-RFC-EL-0020-00 11-Jul-2017
curtain wall

Thickness of Telecommunications Grounding Bus bar


0021 KHEP-RFC-EL-0021-00 12-Jul-2017
(TGB) & Size of Ground bars for Electrical Systems
0021.1 KHEP-RFC-EL-0021-01 Size of ground bars for electrical systems 26-Jul-2017

0021.2 KHEP-RFC-EL-0021-02 Ground Bar Electrical Systems 15-Oct-2017

Shifting of Wiring Devices & Conduit Risers from


0022 KHEP-RFC-EL-0022-00 27-Jul-2017
Columns to Adjacent Block Walls
0023 KHEP-RFC-EL-0023-00 Earthing materials Kings mill Industries (UK) 14-Aug-2017

0024 KHEP-RFC-EL-0024-00 Sheathing of outdoor (Direct Buried) LV and MV cable 17-Aug-2017

Color Coding for 25mm HDPE conduit for


0025 KHEP-RFC-EL-0025-00 20-Aug-2017
Telecommunication sub-duct
Shifting of MV Cable Route from in - road to Walkway on
0026 KHEP-RFC-EL-0026-00 21-Aug-2017
Existing Road
0027 KHEP-RFC-EL-0027-00 Mounting Height of Light Fixture at Parapet Wall 23-Aug-2017
Requirement for 50mm HDPE Conduit from Package
0028 KHEP-RFC-EL-0028-00 26-Aug-2017
Substations to Electric Meters on Villas
0029 KHEP-RFC-EL-0029-00 Telecom Sub-duct Color Coding Arrangement 6-Sep-2017

0029.1 KHEP-RFC-EL-0029-01 Telecom Sub-duct Color Coding Arrangement 28-Sep-2017

0030 KHEP-RFC-EL-0030-00 Mounting height of outlets for WAP3 12-Sep-2017


Oil type Pakage substation, Proposal as per saudi
0031 KHEP-RFC-EL-0031-00 13-Sep-2017
Electrical Company (SEC) Specification
Confirmation by Contractor - Provision of Low Voltage
0031.1 KHEP-RFC-EL-0031-01 23-Oct-2017
Bay Main & Outgoing Circuit Breaker
Residential Telecom room entrance conduit, Direct
0032 KHEP-RFC-EL-0032-00 17-Sep-2017
Connection to the nearest MH

0033 KHEP-RFC-EL-0033-00 Industrial in the utility room for telecom cabinet 27-Sep-2017

110mm PVC duct with 4*25mm diameter HDPE subduct


0034 KHEP-RFC-EL-0034-00 10-Oct-2017
in lieu of 2*32 HDPE conduit

0035 KHEP-RFC-EL-0035-00 Backbox for Data & Telecom Outlet 11-Oct-2017

Relocation & Change of Type of Light Fixtures above


0036 KHEP-RFC-EL-0036-00 17-Oct-2017
Staircase to Wall

0037 KHEP-RFC-EL-0037-00 Cat 6A F/UTP Cable for Outdoor 7-Nov-2017

0038 KHEP-RFC-EL-0038-00 Capacity of Fire Alarm Receiving Station 8-Nov-2017

0039 KHEP-RFC-EL-0039-00 Flow Switch & Temper Switch Location 13-Nov-2017

0039.1 KHEP-RFC-EL-0039-01 Flow Switch & Temper Switch Location 18-Nov-2017

Use of cable ladder system in lieu of PVC conduit and


0040 KHEP-RFC-EL-0040-00 13-Nov-2017
pulll boxes for telecom Cabinet
Relocation of Lighting Fixture and Switches as per Site
0041 KHEP-RFC-EL-0041-00 15-Nov-2017
Conditions - Cluster B2, BC4 & BC6
Lighting Fixture in the Dressing Room (Cluster B2, BC4
0042 KHEP-RFC-EL-0042-00 16-Nov-2017
& BC6)
Use type DB duct for directly buried installation for both
0043 KHEP-RFC-EL-0043-00 18-Nov-2017
power & Telecom System
Provision for Lightning Protection's Down conductor (As
0044 KHEP-RFC-EL-0044-00 20-Nov-2017
designed by Kingsmill)
Relocation of Lighting Fixture due to Clashing with
0045 KHEP-RFC-EL-0045-00 22-Nov-2017
Overhead Section Door at Garage
0046 KHEP-RFC-EL-0046-00 SDR 17 in lieu of SDR 11 HDPE Conduit 22-Nov-2017
Relocation of Lighting Switchs Behind Doors - Type B
0047 KHEP-RFC-EL-0047-00 22-Nov-2017
Clusters

0048 KHEP-RFC-EL-0048-00 Telecom System Pull Box 29-Nov-2017

0049 KHEP-RFC-EL-0049-00 HDPE Subduct 5-Dec-2017

0050 KHEP-RFC-EL-0050-00 Mounting Height of Socket outlets at Toilets 5-Dec-2017


All Homeruns of GF data points will be run at the first
0051 KHEP-RFC-EL-0051-00 7-Dec-2017
floor slab
Fire Alarm System - Client Request Against Project
0052 KHEP-RFC-EL-0052-00 20-Dec-2017
Specification
Fire Alarm System - Client Request Against Project
0053 KHEP-RFC-EL-0053-00 23-Dec-2017
Specification
0054 KHEP-RFC-EL-0054-00 Telecom System Pull Box 23-Dec-2017

0055 KHEP-RFC-EL-0055-00 MV Cable from asphalt carriageway to sidewalk way 26-Dec-2017

0056 KHEP-RFC-EL-0056-00 PVC EMT Conduit Transition for 300mm High Outlets 1-Jan-2018

Combine Duct Bank for Lighting System with Duct Bank


0057 KHEP-RFC-EL-0057-00 1-Jan-2018
for Low Voltage Cables
Use of cable ladder system in lieu of PVC conduit and
0058 KHEP-RFC-EL-0058-00 4-Jan-2018
pulll boxes for telecom Cabinet
0059 KHEP-RFC-EL-0059-00 Cancellation of Lightning Protection System 7-Jan-2018
Change Feeder Source of the Following Street Lighting
0060 KHEP-RFC-EL-0060-00 7-Jan-2018
Panels

0060.1 KHEP-RFC-EL-0060-01 Change Feeder Source of the Street Lighting Panel 1-Feb-2018

0061 KHEP-RFC-EL-0061-00 Resizing Cable for Infrastructure Lighting Circuit 18-Jan-2018


0062 KHEP-RFC-EL-0062-00 Traffic Light 24-Jan-2018

0063 KHEP-RFC-EL-0063-00 New Disconnect Switch for indoor FCUs 1-Feb-2018

Use of cable ladder system in lieu of PVC conduit and


0064 KHEP-RFC-EL-0064-00 11-Feb-2018
pulll boxes for telecom Cabinet

0065 KHEP-RFC-EL-0065-00 FAHU Connection to Nearest Distribution Pillar 11-Feb-2018

0066 KHEP-RFC-EL-0066-00 Cancellation the telecom pull box in Villas 14-Feb-2018

Distance of switches from door Structural Opening &


0067 KHEP-RFC-EL-0067-00 26-Feb-2018
Positioning of Adjecent Data & Electrical Outlets

HVAC
0001 KHEP-RFC-HVAC-0001-00

MECHANICAL
0001 KHEP-RFC-ME-0001-00 Sleeve Pipe 23-Mar-2017
Change of material specification for external water
0002 KHEP-RFC-33-0002-00 22-Jan-2017
distribution piping

0003 KHEP-RFC-ME-0003-00 Air Duct size for all cluster 7-Feb-2017

B2-GF-There is no enough room to place the MEP


0004 KHEP-RFC-ME-0004-00 7-Feb-2017
service above false ceiling

0005 KHEP-RFC-ME-0005-00 B2-GF-Clash between exhaust Ducts and BF4 7-Feb-2017

0006 KHEP-RFC-ME-0006-00 Discrepancy in Plumbing Design Drawings 25-Feb-2017


0007 KHEP-RFC-ME-0007-00 Fresh Air For FCU-GF-02A 12-Mar-2017

0008 KHEP-RFC-ME-0008-00 New Location of of Floor Drain to Avoid Grade Beam 16-Mar-2017

0009 KHEP-RFC-ME-0009-00 Main Fire Fighting Pipe New Routing 16-Mar-2017


0010 KHEP-RFC-ME-0010-00 Mechanical Equipments Concrete Pad Thickness 16-Mar-2017
0011 KHEP-RFC-ME-0011-00 General-Fire Protection Tamper Switch 21-Mar-2017
0012 KHEP-RFC-ME-0012-00 Plummbing-Balcony drain Pipe 21-Mar-2017

0012.1 KHEP-RFC-ME-0012-01 Balcony drain Pipe(Size & Route) 1-May-2017

0012.2 KHEP-RFC-ME-0012-02 Balcony drain Pipe(Size & Route) 11-May-2017


Plummbing-Discrapemcy between design drawing plan
0013 KHEP-RFC-ME-0013-00 21-Mar-2017
layout & riser digram
0014 KHEP-RFC-ME-0014-00 Replace ASTM D 1785 by ASTM D 2665 (DWV) 2-Apr-2017

0015 KHEP-RFC-ME-0015-00 A6 & A4-Fire Protection pipe for closet room 10-Apr-2017

0015.1 KHEP-RFC-ME-0015-01 Cluster A6 & A4 closet room(A6 & A4) 2-May-2017


0016 KHEP-RFC-ME-0016-00 Balcony drain Pipe(Size & Route))] 2-May-2017
0016.1 KHEP-RFC-ME-0016-01 Water meter location for all cluster 11-May-2017
0017 KHEP-RFC-ME-0017-00 Fire Fighting System for Garage Area 16-May-2017
Fire Protection Pipe Size (All Clusters) Hydraulic
0018 KHEP-RFC-ME-0018-00 19-Jun-2017
calculation
Fire Protection & Water supply Pipe Size (All Clusters)
0018.1 KHEP-RFC-ME-0018-01 19-Jul-2017
Hydraulic calculation

0019 KHEP-RFC-ME-0019-00 Pressure in Fire Protection ( All Clusters) 19-Jun-2017

0020 KHEP-RFC-ME-0020-00 Fire Alarm manufacturer Brand 22-Jun-2017

0020.1 KHEP-RFC-ME-0020-01 Fire Alarm manufacturer Brand 1-Aug-2017

Replacement All P-Trap by Gully Trap in Drainage


0021 KHEP-RFC-ME-0021-00 23-Aug-2017
System
0022 KHEP-RFC-ME-0022-00 Use Different PN for uPVC drainage System 29-Aug-2017
Relocation of isolating valve for All Cluster (A4, A6, B2,
0023 KHEP-RFC-ME-0023-00 30-Aug-2017
BC4 & BC6)

0024 KHEP-RFC-ME-0024-00 Use Gully Trap for Balcony Drain 23-Oct-2017

Use Typical Supply Ceiling Diffuser (SCD) in Kitchen of


0025 KHEP-RFC-ME-0025-00 13-Nov-2017
B2, BC4, BC6 Inside of Supply Linear bar Grille (SLBG)

Addition Of Clean out Cover for First Floor Toilets Of All


0026 KHEP-RFC-ME-0026-00 18-Dec-2017
Clusters
Relocation of Balcony Drain for Cluster A6 First Floor,
0027 KHEP-RFC-ME-0027-00 20-Dec-2017
Balcony FF-101
Cost & Time Impact for Additional Vent Pipe as per
0028 KHEP-RFC-ME-0028-00 Requirement In Shop Standard Detail In Opposed to 28-Dec-2017
Original Contract

0029 KHEP-RFC-ME-0029-00 Relocation of Vent Pipe Connection for Water Closet 4-Jan-2018

Use of 0.9mm Thick Aluminium Cladding Instead of


0030 KHEP-RFC-ME-0030-00 18-Jan-2018
Stainless Steel Cladding
Cancellation of Isolation Valve for Water Hammer
0031 KHEP-RFC-ME-0031-00 18-Jan-2018
Arrestor for All Clusters
Cost & Time Impact for Additional Watter Supply Pipe,
0032 KHEP-RFC-ME-0032-00 Drainage Pipe for Dishwasher as Opposed to Original 1-Feb-2018
Contract
Use of 4G Degree Fittings to Minimize Floor Clean Out In
0033 KHEP-RFC-ME-0033-00 1-Feb-2018
First Floor

Use of 4G Degree Fittings to Minimize Floor Clean Out In


0034 KHEP-RFC-ME-0034-00 8-Feb-2018
First Floor Master Bedroom Cluster Type A4 & A6

Copper Tube Pipe Diameter of Condenser Coil of Fresh


0035 KHEP-RFC-ME-0035-00 20-Feb-2018
Air Package Unit

0036 KHEP-RFC-ME-0036-00 Cancellation of Secondry Drain Pan of Fan Cion Unit 26-Feb-2018

LOW CURRENT (TELECOM)


0001 KHEP-RFC-LC-0001-00

STRUCTURAL
0001 KHEP-RFC-ST-0001-00 B2-Roof-Missing Beam Number 19-Mar-2017
0002 KHEP-RFC-ST-0002-00 B2-Roof-Beam Discrepancy 19-Mar-2017

0003 KHEP-RFC-ST-0003-00 All Cluster-Shaft Openning Slab 19-Mar-2017

0004 KHEP-RFC-ST-0004-00 All Cluster-Concrete Parapet Coping 19-Mar-2017

0005 KHEP-RFC-ST-0005-00 A6 Roof-Beam Discrepancy-A6 19-Mar-2017

0006 KHEP-RFC-ST-0006-00 A6 Ground Floor-Beam Discrepancy-A6 19-Mar-2017

0007 KHEP-RFC-ST-0007-00 B2-RB2 Roof Beam 19-Mar-2017


0007.1 KHEP-RFC-ST-0007-01 B2-RB2 Roof Beam 20-Apr-2017
0007.2 KHEP-RFC-ST-0007-02 B2, BC4 & BC6 - RB2 Roof Beam 6-Jun-2017
0008 KHEP-RFC-ST-0008-00 A6-Section D Discrepancy 10-Apr-2017

0009 KHEP-RFC-ST-0009-00 BC4-Cantilever Slab Discrepancy 11-Apr-2017

0010 KHEP-RFC-ST-0010-00 Using PVC spacers 11-Feb-2017

0011 KHEP-RFC-ST-0011-00 Cluster-A4 & A6 Wall W8 Discrepancy 11-Apr-2017

0012 KHEP-RFC-ST-0012-00 A6 All Clusters-Balcony-Slab Stand 12-Apr-2017


0013 KHEP-RFC-ST-0013-00 Ground Floor-BC4 & BC6 Beam Discrepancy 12-Apr-2017

0014 KHEP-RFC-ST-0014-00 Discrepancy in location of cluster C49-(BC6) 2-May-2017

0015 KHEP-RFC-ST-0015-00 Isolation Joint Thickness 3-May-2017

0016 KHEP-RFC-ST-0016-00 BC4 & BC6 - Roof Shaft Discrepancy 15-May-2017

0017 KHEP-RFC-ST-0017-00 BC4 & BC6 - Roof Beam Discrepancy 18-May-2017

0018 KHEP-RFC-ST-0018-00 Public Toilet Section - A & F Discrepancy 21-Jun-2017

0018.1 KHEP-RFC-ST-0018-01 Public Toilet Section - A & F Discrepancy 9-Jul-2017

0018.2 KHEP-RFC-ST-0018-02 Public Toilet Section - A & F Discrepancy 16-Jul-2017

0019 KHEP-RFC-ST-0019-00 Public Toilet Section - A Discrepancy 21-Jun-2017

0019.1 KHEP-RFC-ST-0019-01 Public Toilet Section - A Discrepancy 9-Jul-2017

0019.2 KHEP-RFC-ST-0019-02 Public Toilet Section - A Discrepancy 16-Jul-2017

0020 KHEP-RFC-ST-0020-00 Reinforcement Steel Type 17-Aug-2017


0021 KHEP-RFC-ST-0021-00 Use of deformed black steel rebar 19-Sep-2017

0022 KHEP-RFC-ST-0022-00 Ground Floor-B2 Architectural Wall Discrepancy 21-Sep-2017

0023 KHEP-RFC-ST-0023-00 Proposed Detail of Concrete Coping for parapet Walls 28-Sep-2017

0024 KHEP-RFC-ST-0024-00 Parapet Columns as Variation order 5-Oct-2017

0025 KHEP-RFC-ST-0025-00 Cluster B2, BC4 & BC6 New Shaft Openings 10-Oct-2017

0026 KHEP-RFC-ST-0026-00 Cluster A4 & A6 Roof Floor Cantilever Beam 11-Oct-2017

0027 KHEP-RFC-ST-0027-00 Cluster A4 & A6 Roof Floor Cantilever Beam Location 11-Oct-2017

0028 KHEP-RFC-ST-0028-00 Slab on Grade Thickness 17-Oct-2017

0029 KHEP-RFC-ST-0029-00 Clusters B2, BC4 & BC6 Wall W5 Discrepancy 26-Oct-2017

Using sand for filling under Slab on Grade instead of


0030 KHEP-RFC-ST-0030-00 8-Nov-2017
Select Fill Material
Change in Cluster B2, BC4 & BC6 Beam RB6 (Grid 2)
0031 KHEP-RFC-ST-0031-00 12-Nov-2017
Location and Depth

0032 KHEP-RFC-ST-0032-00 All Cluster Proposed concrete Pads 27-Nov-2017

0033 KHEP-RFC-ST-0033-00 All Cluster Proposed Roof Shafts Cover Slab Details 20-Dec-2017

Change in Cluster B2, BC4 & BC6 Beam Above External


0034 KHEP-RFC-ST-0034-00 25-Dec-2017
Opening
Change in Cluster A6, A4, B2, BC4 & BC6 Beam Above
0034.1 KHEP-RFC-ST-0034-01 1-Feb-2018
External Opening
Change in Cluster A6, A4, B2, BC4 & BC6 Beam Above
0034.2 KHEP-RFC-ST-0034-02 11-Feb-2018
External Opening
A Approved

B Approved w/ Comments

C Revise & Resubmit

E Rejected
SUBMITTED FOR RESPONDED AS
DISCIPLINE DATE RESPONDED INTERNEL REFERENCE NO
CODE STATUS CODE STATUS

Approved w/
Architectural 1 Approval 5-Mar-2017 B comments
KHEP-RFC-AR-0001-00

Architectural 1 Approval 2-Mar-2017 E Rejected KHEP-RFC-AR-0002-00


Architectural 1 Approval 6-Mar-2017 A Approved KHEP-RFC-AR-0003-00
Approved w/
Architectural 1 Approval 14-Mar-2017 B comments
KHEP-RFC-AR-0004-00

Architectural 1 Approval 18-Mar-2017 E Rejected KHEP-RFC-AR-0005-00

Approved w/
Architectural 1 Approval 21-Sep-2017 B comments
KHEP-RFC-AR-0005-01

Architectural 1 Approval 4-Mar-2017 RECALLED KHEP-RFC-AR-0006-00

Approved w/
Architectural 1 Approval 20-Feb-2017 B comments
KHEP-RFC-AR-0007-00

Approved w/
Architectural 1 Approval 26-Mar-2017 B comments
KHEP-RFC-AR-0008-00

Architectural 1 Approval 21-Feb-2017 C Revise & Resubmit KHEP-RFC-AR-0009-00

Architectural 1 Approval 21-Mar-2017 C Revise & Resubmit KHEP-RFC-AR-0009-01

Architectural 1 Approval 22-Mar-2017 C Revise & Resubmit KHEP-RFC-AR-0010-00

Architectural 1 Approval 29-Mar-2017 C Revise & Resubmit KHEP-RFC-AR-0011-00

Architectural 1 Approval 2-May-2017 C Revise & Resubmit KHEP-RFC-AR-0012-00

Architectural 1 Approval 20-May-2017 C Revise & Resubmit KHEP-RFC-AR-0012-01

Architectural 1 Approval 12-Jun-2017 C Revise & Resubmit KHEP-RFC-AR-0012-02

Architectural 1 Approval 2-May-2017 C Revise & Resubmit KHEP-RFC-AR-0013-00

Architectural 1 Approval 20-May-2017 C Revise & Resubmit KHEP-RFC-AR-0013-01

Architectural 1 Approval 12-Jun-2017 C Revise & Resubmit KHEP-RFC-AR-0013-02

Architectural 1 Approval 5-Jun-2017 D For Information KHEP-RFC-AR-0014-00


Approved w/
Architectural 1 Approval 8-Jun-2017 B comments
KHEP-RFC-AR-0015-00

Architectural 1 Approval 22-Jun-2017 C Revise & Resubmit KHEP-RFC-AR-0016-00

Architectural 1 Approval 23-Nov-2017 C Revise & Resubmit KHEP-RFC-AR-0016-01

Architectural 1 Approval 23-Jul-2017 C Revise & Resubmit KHEP-RFC-AR-0017-00

Architectural 1 Approval 8-Jul-2017 C Revise & Resubmit KHEP-RFC-AR-0018-00

Approved w/
Architectural 1 Approval 12-Jul-2017 B comments
KHEP-RFC-AR-0019-00

Approved w/
Architectural 1 Approval 27-Jul-2017 B comments
KHEP-RFC-AR-0020-00

Approved w/
Architectural 1 Approval 29-Jul-2017 B comments
KHEP-RFC-AR-0021-00
Approved w/
Architectural 1 Approval 20-Sep-2017 B comments
KHEP-RFC-AR-0021-01

Approved w/
Architectural 1 Approval 28-Sep-2017 B comments
KHEP-RFC-AR-0022-00

Architectural 1 Approval 28-Sep-2017 A Approved KHEP-RFC-AR-0023-00


Approved w/
Architectural 1 Approval 25-Oct-2017 B comments
KHEP-RFC-AR-0024-00

Architectural 1 Approval 20-Nov-2017 C Revise & Resubmit KHEP-RFC-AR-0024-01

Approved w/
Architectural 1 Approval 26-Oct-2017 B comments
KHEP-RFC-AR-0025-00

Architectural 1 Approval 25-Oct-2017 C Revise & Resubmit KHEP-RFC-AR-0026-00

Architectural 1 Approval 30-Nov-2017 C Revise & Resubmit KHEP-RFC-AR-0027-00

Approved w/
Architectural 1 Approval 30-Dec-2017 B comments
KHEP-RFC-AR-0028-00

Approved w/
Architectural 1 Approval 18-Dec-2017 B comments
KHEP-RFC-AR-0029-00

Architectural 1 Approval 23-Nov-2017 C Revise & Resubmit KHEP-RFC-AR-0030-00

Approved w/
Architectural 1 Approval 2-Jan-2018 B comments
KHEP-RFC-AR-0030-01

Architectural 1 Approval 29-Nov-2017 A Approved KHEP-RFC-AR-0031-00


Approved w/
Architectural 1 Approval 20-Dec-2017 B comments
KHEP-RFC-AR-0032-00

Approved w/
Architectural 1 Approval 12-Dec-2017 B comments
KHEP-RFC-AR-0033-00

Architectural 1 Approval 12-Dec-2017 D Information KHEP-RFC-AR-0034-00

Architectural 1 Approval 20-Dec-2017 D Information KHEP-RFC-AR-0034-01

Architectural 1 Approval 20-Dec-2017 D Information KHEP-RFC-AR-0035-00

Architectural 1 Approval 25-Dec-2017 D Information KHEP-RFC-AR-0036-00

Approved w/
Architectural 1 Approval 20-Dec-2017 B comments
KHEP-RFC-AR-0037-00

Approved w/
Architectural 1 Approval 20-Dec-2017 B comments
KHEP-RFC-AR-0038-00

Architectural 1 Approval 2-Jan-2018 E Rejected KHEP-RFC-AR-0039-00

Architectural 1 Approval 4-Jan-2018 C Revise & Resubmit KHEP-RFC-AR-0040-00

Architectural 1 Approval 31-Jan-2018 A Approved KHEP-RFC-AR-0040-01

Approved w/
Architectural 1 Approval 2-Jan-2018 B comments
KHEP-RFC-AR-0041-00

Architectural 1 Approval 24-Jan-2018 D Information KHEP-RFC-AR-0042-00

Approved w/
Architectural 1 Approval 24-Feb-2018 B comments
KHEP-RFC-AR-0042-01

Approved w/
Architectural 1 Approval 24-Jan-2018 B comments
KHEP-RFC-AR-0043-00

Approved w/
Architectural 1 Approval 20-Jan-2018 B comments
KHEP-RFC-AR-0044-00

Approved w/
Architectural 1 Approval 27-Feb-2018 B comments
KHEP-RFC-AR-0044-01

Approved w/
Architectural 1 Approval 31-Jan-2018 B comments
KHEP-RFC-AR-0045-00

Approved w/
Architectural 1 Approval 13-Feb-2018 B comments
KHEP-RFC-AR-0046-00

Approved w/
Architectural 1 Approval 24-Feb-2018 B comments
KHEP-RFC-AR-0047-00

Architectural 1 Approval KHEP-RFC-AR-0048-00


Architectural 1 Approval KHEP-RFC-AR-0049-00

CIVIL 1 Approval 15-Jan-2017 C Revise & Resubmit KAUST-SHOP-DW-0001-00

CIVIL 1 Approval 31-Jan-2017 C Revise & Resubmit 1356DF-SHOP-C-SS-0001-01

CIVIL 1 Approval 22-Feb-2017 E Rejected


Approved w/
CIVIL 1 Approval 9-Mar-2017 B comments
Approved w/
CIVIL 1 Approval 26-Mar-2017 B comments
CIVIL 1 Approval 22-Mar-2017 D Recall-Email
CIVIL 1 Approval 28-Mar-2017 E Rejected
Approved w/
CIVIL 1 Approval 25-Apr-2017 B comments
CIVIL 1 Approval 14-Aug-2017 A Approved
CIVIL 1 Approval 27-Mar-2017 A Approved
CIVIL 1 Approval 2-Apr-2017 Recalled

CIVIL 1 Approval 13-Apr-2017 C Revise & Resubmit

CIVIL 1 Approval 17-Apr-2017 A Approved


CIVIL 1 Approval 18-Apr-2017 V Review
CIVIL 1 Approval 17-Apr-2017 D for Information
CIVIL 1 Approval 2-May-2017 E Rejected
CIVIL 1 Approval 22-May-2017 E Rejected
CIVIL 1 Approval 22-May-2017 E Rejected
Approved w/
CIVIL 1 Approval 29-May-2017 B comments
Approved w/
CIVIL 1 Approval 23-May-2017 B comments
CIVIL 1 Approval 8-Jun-2017 D for Information
CIVIL 1 Approval 3-Jun-2017 A Approved

CIVIL 1 Approval 13-Jun-2017 C Revise & Resubmit

CIVIL 1 Approval 4-Oct-2017 C Revise & Resubmit

Approved w/
CIVIL 1 Approval 23-Jul-2017 B comments
Approved w/
CIVIL 1 Approval 13-Jul-2017 B comments

CIVIL 1 Approval 13-Jul-2017 C Revise & Resubmit

Approved w/
CIVIL 1 Approval 20-Jul-2017 B comments

CIVIL 1 Approval 7-Aug-2017 A status

Approved w/
CIVIL 1 Approval 9-Aug-2017 B comments
Approved w/
CIVIL 1 Approval 15-Aug-2017 B comments

CIVIL 1 Approval 30-Sep-2017 C Revise & Resubmit

Approved w/
CIVIL 1 Approval 9-Oct-2017 B comments
Approved w/
CIVIL 1 Approval 26-Sep-2017 B comments
Approved w/
CIVIL 1 Approval 28-Oct-2017 B comments
CIVIL 1 Approval 27-Dec-2017 A Approved

CIVIL 1 Approval 3-Jan-2018 C Revise & Resubmit

Approved w/
CIVIL 1 Approval 16-Jan-2018 B comments
CIVIL 1 Approval 11-Jan-2018 A Approved
Approved w/
CIVIL 1 Approval 29-Jan-2018 B Commnets
CIVIL 1 Approval 18-Feb-2018 E Rejected

CIVIL 1 Approval 4-Feb-2018 C Revise & Resubmit

Approved w/
CIVIL 1 Approval 5-Feb-2018 B Commnets
Approved w/
CIVIL 1 Approval 28-Feb-2018 B Commnets
Approved w/
CIVIL 1 Approval 28-Feb-2018 B Commnets
CIVIL 1 Approval 18-Feb-2018 E Rejected

Electrical 1 Approval 22-Feb-2017 D for Information


Electrical 1 Approval 20-Mar-2017 E Rejected
Electrical 1 Approval 20-Feb-2017 E Rejected
Electrical 1 Approval 27-Feb-2017 A Approved
Electrical 1 Approval 5-Mar-2017 D for Information

Electrical 1 Approval 6-Mar-2017 C Revise & Resubmit

Electrical 1 Approval 19-Mar-2017 D for Information

Approved w/
Electrical 1 Approval 20-Feb-2017 B Commnets
Electrical 1 Approval 13-Mar-2017 E Rejected
Approved w/
Electrical 1 Approval 5-Apr-2017 B Commnets
Approved w/
Electrical 1 Approval 13-Apr-2017 B Commnets

Electrical 1 Approval 13-Apr-2017 V Review

Electrical 1 Approval 5-Apr-2017 C Revise & Resubmit

Electrical 1 Approval 23-Apr-2017 V Review


Electrical 1 Approval 29-Apr-2017 V Review
Approved w/
Electrical 1 Approval 27-May-2017 B Commnets
Approved w/
Electrical 1 Approval 24-May-2017 B Commnets

Electrical 1 Approval 19-Jun-2017 A Approved

Electrical 1 Approval 21-Jun-2017 A Approved

Electrical 1 Approval 4-Jul-2017 C Revise & Resubmit

Electrical 1 Approval 25-Jul-2017 C Revise & Resubmit

Electrical 1 Approval 18-Jul-2017 C Revise & Resubmit


Approved w/
Electrical 1 Approval 31-Jul-2017 B Commnets
Approved w/
Electrical 1 Approval 17-Oct-2017 B Commnets
Approved w/
Electrical 1 Approval 3-Aug-2017 B Commnets
Electrical 1 Approval 30-Sep-2017 A Approved
Approved w/
Electrical 1 Approval 22-Aug-2017 B Commnets

Electrical 1 Approval 26-Aug-2017 E Rejected

Approved w/
Electrical 1 Approval 28-Aug-2017 B Commnets
Electrical 1 Approval 28-Aug-2017 A Approved

Electrical 1 Approval 13-Sep-2017 E Rejected

Electrical 1 Approval 13-Sep-2017 E Rejected


Approved w/
Electrical 1 Approval 2-Oct-2017 B Commnets
Electrical 1 Approval 9-Oct-2017 A Approved
Approved w/
Electrical 1 Approval 30-Sep-2017 B Commnets
Approved w/
Electrical 1 Approval 26-Oct-2017 B Commnets
Approved w/
Electrical 1 Approval 20-Sep-2017 B Commnets
Approved w/
Electrical 1 Approval 9-Oct-2017 B Commnets

Electrical 1 Approval RECALLED

Electrical 1 Approval 25-Oct-2017 C Revise & Resubmit

Approved w/
Electrical 1 Approval 25-Oct-2017 B Commnets

Electrical 1 Approval 16-Nov-2017 C Revise & Resubmit

Approved w/
Electrical 1 Approval 15-Nov-2017 B Commnets

Electrical 1 Approval 15-Nov-2017 C Revise & Resubmit

Approved w/
Electrical 1 Approval 22-Nov-2017 B Commnets

Electrical 1 Approval RECALLED

Electrical 1 Approval 26-Nov-2017 A Approved

Approved w/
Electrical 1 Approval 27-Dec-2017 B Commnets
Approved w/
Electrical 1 Approval 26-Nov-2017 B Commnets

Electrical 1 Approval 27-Dec-2017 E Rejected

Approved w/
Electrical 1 Approval 29-Nov-2017 B Commnets
Electrical 1 Approval 11-Dec-2017 A Approved

Electrical 1 Approval 29-Nov-2017 A Approved

Approved w/
Electrical 1 Approval 24-Dec-2017 B Commnets
Approved w/
Electrical 1 Approval 24-Dec-2017 B Commnets
Electrical 1 Approval 24-Dec-2017 A Approved
Approved w/
Electrical 1 Approval 24-Dec-2017 B Commnets

Electrical 1 Approval 27-Dec-2017 D Information

Electrical 1 Approval 27-Dec-2017 D Information

Electrical 1 Approval RECALLED


Approved w/
Electrical 1 Approval 8-Jan-2018 B Commnets
Approved w/
Electrical 1 Approval 10-Jan-2018 B Commnets

Electrical 1 Approval 8-Jan-2018 E Rejected

Electrical 1 Approval RECALLED

Electrical 1 Approval 23-Jan-2018 D Information

Electrical 1 Approval 28-Jan-2018 E Rejected

Electrical 1 Approval 14-Feb-2018 A Approved

Electrical 1 Approval 27-Jan-2018 E Rejected


Electrical 1 Approval 4-Feb-2018 E Rejected
Approved w/
Electrical 1 Approval 28-Feb-2018 B Commnets

Electrical 1 Approval RECALLED

Approved w/
Electrical 1 Approval 14-Feb-2018 B Commnets
Approved w/
Electrical 1 Approval 21-Feb-2018 B Commnets

Electrical 1 Approval

Mechanical 1 Approval 27-Mar-2017 A Approved


Approved w/
Mechanical 1 Approval 26-Jan-2017 B comments
Tender Specification Section 33 1116

Approved w/
Mechanical 1 Approval 12-Feb-2017 B comments
1356DF-M-002

Approved w/
Mechanical 1 Approval 21-Feb-2017 B comments
1356SDF-CL-B2-M-201

Approved w/
Mechanical 1 Approval 12-Feb-2017 B comments
1356SDF-CL-B2-M-201

Mechanical 1 Approval 1-Mar-2017 A Approved KHEP-RFC-ME-0006-00


Mechanical 1 Approval 22-Mar-2017 A Approved KHEP-RFC-ME-0007-00

Mechanical 1 Approval 21-Mar-2017 A Approved KHEP-RFC-ME-0008-00

Mechanical 1 Approval 20-Mar-2017 A Approved KHEP-RFC-ME-0009-00


Mechanical 1 Approval 21-Mar-2017 A Approved KHEP-RFC-ME-0010-00
Mechanical 1 Approval 27-Mar-2017 E Rejected KHEP-RFC-ME-0011-00
Mechanical 1 Approval 27-Mar-2017 A Approved KHEP-RFC-ME-0012-00

Mechanical 1 Approval 9-May-2017 C Revise & Resubmit KHEP-RFC-ME-0012-01

Mechanical 1 Approval 15-May-2017 E Rejected KHEP-RFC-ME-0012-02


Mechanical 1 Approval 27-Mar-2017 A Approved KHEP-RFC-ME-0013-00

Mechanical 1 Approval 9-Apr-2017 V Review KHEP-RFC-ME-0014-00

Mechanical 1 Approval 11-Apr-2017 C Revise & Resubmit KHEP-RFC-ME-0015-00

Mechanical 1 Approval 25-May-2017 E Rejected KHEP-RFC-ME-0015-01


Mechanical 1 Approval 9-May-2017 E Rejected KHEP-RFC-ME-0016-00
Mechanical 1 Approval 17-May-2017 V Review KHEP-RFC-ME-0016-01
Mechanical 1 Approval 17-May-2017 A Approved KHEP-RFC-ME-0017-00
Approved w/
Mechanical 1 Approval 28-Jun-2017 B comments
KHEP-RFC-ME-0018-00

Mechanical 1 Approval 3-Aug-2017 E Rejected KHEP-RFC-ME-0018-01

Approved w/
Mechanical 1 Approval 28-Jun-2017 B comments
KHEP-RFC-ME-0019-00

Mechanical 1 Approval 16-Jul-2017 C Revise & Resubmit KHEP-RFC-ME-0020-00

Mechanical 1 Approval 5-Aug-2017 C Revise & Resubmit KHEP-RFC-ME-0020-01

Approved w/
Mechanical 1 Approval 30-Aug-2017 B comments
KHEP-RFC-ME-0021-00

Mechanical 1 Approval 25-Sep-2017 A Approved KHEP-RFC-ME-0022-00


Approved w/
Mechanical 1 Approval 12-Sep-2017 B comments
KHEP-RFC-ME-0023-00

Approved w/
Mechanical 1 Approval 26-Oct-2017 B comments
KHEP-RFC-ME-0024-00

Approved w/
Mechanical 1 Approval 26-Nov-2017 B comments
KHEP-RFC-ME-0025-00

Approved w/
Mechanical 1 Approval 24-Dec-2017 B Commnets
KHEP-RFC-ME-0026-00

Approved w/
Mechanical 1 Approval 23-Dec-2017 B comments
KHEP-RFC-ME-0027-00

Approved w/
Mechanical 1 Approval 3-Jan-2018 B comments
KHEP-RFC-ME-0028-00

Mechanical 1 Approval 10-Jan-2018 A Approved KHEP-RFC-ME-0029-00

Mechanical 1 Approval 23-Jan-2018 E Rejected KHEP-RFC-ME-0030-00

Mechanical 1 Approval 23-Jan-2018 E Rejected KHEP-RFC-ME-0031-00

Approved w/
Mechanical 1 Approval 27-Feb-2018 B comments
KHEP-RFC-ME-0032-00

Approved w/
Mechanical 1 Approval 12-Feb-2018 B comments
KHEP-RFC-ME-0033-00

Approved w/
Mechanical 1 Approval 12-Feb-2018 B comments
KHEP-RFC-ME-0034-00

Mechanical 1 Approval 21-Feb-2018 A Approved KHEP-RFC-ME-0035-00

Mechanical 1 Approval KHEP-RFC-ME-0036-00

Approved w/
Structural 1 Approval 26-Mar-2017 B comments
1356DF-B2-S-FR-203
Approved w/
Structural 1 Approval 8-Apr-2017 B comments
1356DF-B2-S-FR-203 1356DF-B2-S-GN-401

Structural 1 Approval 21-Mar-2017 C Revise & Resubmit A-G-A902

Structural 1 Approval 21-Mar-2017 C Revise & Resubmit A-G-A905

Approved w/
Structural 1 Approval 26-Mar-2017 B comments
1356DF-A6-S-FR-203 1356DF-CL-A6-202

Approved w/
Structural 1 Approval 29-Mar-2017 B comments
1356DF-A6-S-FR-201 1356DF-CL-A6-201

Structural 1 Approval 23-Mar-2017 E Rejected


1356DF-B2-S-FR-203 1356DF-B2-S-GN-802 1356DF-B2-S-GN-401
Structural 1 Approval 16-May-2017 V Review KHEP-ST-0007-01
Structural 1 Approval 7-Jun-2017 E Rejected KHEP-ST-0007-02
Structural 1 Approval 13-Apr-2017 A Approved

Structural 1 Approval 13-Apr-2017 C Revise & Resubmit

Approved w/
Structural 1 Approval 14-Feb-2017 B comments
Approved w/
Structural 1 Approval 13-Apr-2017 B comments
Structural 1 Approval 19-Apr-2017 A 1356DF-A6-S-FR-202
Approved 1356DF-A6-S-GN-401 1356DF-CL-A6-702
Structural 1 Approval 19-Apr-2017 A
1356DF-BC4-S-FR-201
Approved 1356DF-CL-BC4-201 1356DF-BC6-S-FR-201 1356DF-CL-BC6-201
Approved w/ 1356DF-U-US-403
Structural 1 Approval 16-May-2017 B comments 1356DF-U-US-413
Approved w/ 1356DF-S-GN-005
Structural 1 Approval 16-May-2017 B comments 1356DF-B2-S-GN-401
1356DF-BC4-S-GN-401
Structural 1 Approval 16-May-2017 A Approved 1356DF-BC4-S-FR-203
1356DF-BC6-S-FR-203
1356DF-BC4-S-GN-802
Structural 1 Approval 24-May-2017 C Revise & Resubmit
1356DF-BC6-S-FR-203
Approved w/ 1356DF-BC4-S-GN-802
1356DF-PT-S-FR-201
Structural 1 Approval 5-Jul-2017 B comments 1356DF-PT-S-GN-401
Approved w/ 1356DF-PT-S-FR-201
Structural 1 Approval 12-Jul-2017 B comments 1356DF-PT-S-GN-401
Approved w/ 1356DF-PT-S-FR-201
Structural 1 Approval 31-Oct-2017 B comments 1356DF-PT-S-GN-401
Approved w/ 1356DF-PTA-S-FR-201
Structural 1 Approval 5-Jul-2017 B comments 1356DF-PTA-S-GN-401
Approved w/ 1356DF-PTA-S-FR-201
Structural 1 Approval 12-Jul-2017 B comments 1356DF-PTA-S-GN-401
Approved w/ 1356DF-PTA-S-FR-201
Structural 1 Approval 31-Oct-2017 B comments 1356DF-PTA-S-GN-401
Structural 1 Approval 27-Sep-2017 A Approved
ASTM A615/615M Grade 420 Mpa
Structural 1 Approval 28-Sep-2017 A Approved 1356DF-S-GN-002
Approved w/
Structural 1 Approval 26-Sep-2017 B comments
1356DF-B2-S-FR-201

Approved w/
Structural 1 Approval 3-Oct-2017 B comments
1356DF-A-G-A902

Approved w/
Structural 1 Approval 5-Nov-2017 B comments
KHEP-SD-ST-0040-02

Approved w/
Structural 1 Approval 19-Oct-2017 B comments
Structural 1 Approval 18-Oct-2017 E Rejected 1356F-A4-S-FR-203 135DF-A4-S-FR-203

Structural 1 Approval 18-Oct-2017 A Approved


KHEP-SD-ST-A4-GA-RF-006 KHEP-SD-ST-A6-GA-RF-006

Structural 1 Approval 25-Oct-2017 E Rejected


Approved w/
Structural 1 Approval 5-Nov-2017 B comments
Approved w/
Structural 1 Approval 15-Nov-2017 B comments
Structural 1 Approval 26-Dec-2017 E Rejected

Approved w/
Structural 1 Approval 30-Nov-2017 B comments

Structural 1 Approval 26-Dec-2017 C Revise & Resubmit

Structural 1 Approval 6-Jan-2018 C Revise & Resubmit

Structural 1 Approval 4-Feb-2018 C Revise & Resubmit

Structural 1 Approval
REMARKS COMMENTS

Closed

Closed
Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed
Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Open
Open

Closed

Closed

Closed

Closed

Closed

Closed
Closed

Closed

Closed
Closed
Closed

Closed

Closed
Closed
Closed
Closed
Closed
Closed

Closed

Closed

Closed
Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed
Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed
Closed
Closed
Closed
Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed
Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed
Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed
Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed
Closed

Closed

Closed

Closed

Open

Closed

Closed

Closed

Closed

Closed

Closed
Closed

Closed

Closed
Closed
Closed
Closed

Closed

Closed
Closed

Closed

Closed

Closed
Closed
Closed
Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Open

Closed
Closed

Closed

Closed

Closed

Closed

Closed
Closed
Closed
Closed

Closed

Closed

Closed

Closed
Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed
Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed
Closed

Closed

Closed

Closed

Closed

Open
SR NO RISK ASSESSMENT NO. ACTIVITIES / INSPECTION ITEMS SUBMITTED DATE

ARCHITECTURAL
0001 KHEP-RA-AR-0001-00

CIVIL
0001 KHEP-OT-0010-00 Risk Assessment for Earth Work and Excavation 1-Feb-2017
Risk Assessment for Loading and Unloading of Material Manually or with
0002 KHEP-OT-0011-00 1-Feb-2017
Crane
0003 KHEP-OT-0012-00 Risk Assessment for Installation of Chain Link Fence 1-Feb-2017
Risk Assesment for Form Work, Reinforcing Steel Work & Concrete
0004 KHEP-RA-CI-0004-00 14-Feb-2017
Placement
Risk Assessment for Construction of Offices, Warehouse & Workshop
0005 KHEP-RA-CI-0005-00 14-Feb-2017
Installation

0006 KHEP-RA-CI-0006-00 Risk Assessment for Termite Control 14-Feb-2017

0007 KHEP-RA-CI-0007-00 Risk Assessment for Cut and Bend Steel Rebar 21-Feb-2017
Risk Assessment for Civil Work of Electrical Cable Pulling & Cable
0008 KHEP-RA-CI-0008-00 26-Feb-2017
Termination

0009 KHEP-RA-CI-0009-00 Risk Assessment for Asphalt Paving 26-Feb-2017

0010 KHEP-RA-CI-0010-00 Risk Assessment for Installation of Media Fence 16-Mar-2017

0011 KHEP-RA-CI-0011-00 Risk Assessment for Water Proofing And Damp Proofing 27-Mar-2017

0012 KHEP-RA-CI-0012-00 Risk Assessment for Signage Installation 8-May-2017

0012.1 KHEP-RA-CI-0012-01 Risk Assessment for Signage Installation 16-May-2017

ELECTRICAL
0001 KHEP-RA-EL-0001-00 Risk Assessment for Electric Cable Pulling & Cable Termination 14-Feb-2017

0002 KHEP-RA-EL-0001-01 Risk Assessment for Electrical Cable Pulling & Cable Termination 26-Feb-2017

HVAC
0001 KHEP-RFC-HVAC-0001-00

MECHANICAL
0001 KHEP-RA-ME-0001-00 Risk Assessment For Installation Of Underground Utilities 21-Feb-2017

0002 KHEP-RA-ME-0002-00 Risk Assessment For Installation Of Fire Fighting System 21-Feb-2017

Risk Assessment for Construction of Offices, Ware House and Work Shop
0003 KHEP-RA-ME-0003-00 20-Mar-2017
Installation Night Work

LOW CURRENT (TELECOM)


0001 KHEP-RFC-TE-0001-00
STRUCTURAL
0001 KHEP-RA-ST-0001-00
A Approved

B Approved w/ Comments

C Revise & Resubmit

E Rejected
SUBMITTED FOR RESPONDED AS
DISCIPLINE DATE RESPONDED INTERNEL REFERENCE NO
CODE STATUS CODE STATUS

Civil 1 Approval 7-Feb-2017 A Approved kHEP-RA-003-00

Civil 1 Approval 7-Feb-2017 A Approved kHEP-RA-004-00

Civil 1 Approval 7-Feb-2017 A Approved kHEP-RA-005-00

Civil 1 Approval 22-Feb-2017 A Approved KHEP-RA-CI-0004-00

Approved w/
Civil 1 Approval 22-Feb-2017 B Comments
KHEP-RA-CI-0005-00

Approved w/
Civil 1 Approval 22-Feb-2017 B Comments
KHEP-RA-CI-0006-00

Civil 1 Approval 27-Feb-2017 A Approved KHEP-RA-CI-0007-00


Approved w/
Civil 1 Approval 27-Feb-2017 B Comments
KHEP-RA-CI-0008-00

Approved w/
Civil 1 Approval 27-Feb-2017 B Comments
KHEP-RA-CI-0009-00

Civil 1 Approval 22-Mar-2017 A Approved KHEP-RA-CI-0010-00


Approved w/
Civil 1 Approval 4-Apr-2017 B Comments
KHEP-RA-CI-0011-00

Revise &
Civil 1 Approval 14-May-2017 C Resubmit
KHEP-RA-CI-0012-00

Civil 1 Approval 25-May-2017 A Approved KHEP-RA-CI-0012-01

Revise &
Electrical 1 Approval 22-Feb-2017 C Resubmit
KHEP-RA-0007-00

Approved w/
Electrical 1 Approval 27-Feb-2017 B Comments
KHEP-RA-0007-01

Mechanical 1 Approval 27-Feb-2017 A Approved KHEP-RA-ME_0001-00


Revise &
Mechanical 1 Approval 27-Feb-2017 C Resubmit
KHEP-RA-ME_0002-00

Approved w/
Mechanical 1 Approval 26-Mar-2017 B Comments
KHEP-RA-ME_0003-00
REMARKS COMMENTS

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed
A Approved

B Approved With Comments

E Rejected

SUBMITTED REQUESTED INSPECTION RESPONDED AS REMARKS


SR NO RFI NO. ACTIVITIES / INSPECTION ITEMS LOCATION ZONE AREA DIVISION DATE RESPONDED
DATE DATE TIME CODE STATUS COMMENTS

ARCHITECTURAL
Installation of CMU Block work for perimeter and inner partition at
first floor Mockup Building Cluster 69 up to windows lentils level as
001 KHEP-AR-0001 highlighted drawing. With all block installation accessories and wall Cluster 69 Zone 4B Division 04 8-Jul-2017 9-Jul-2017 8:30AM 13-Aug-2017 E Rejected Closed
insulation 50mm polystyrene foam & cast in place window sills Zone
4B, Cluster 69, First floor

Installation of CMU Block work for perimeter and inner partition at


first floor Mockup Building Cluster 69 up to windows lentils level as
001 KHEP-AR-0001-01 highlighted drawing. With all block installation accessories and wall Cluster 69 Zone 4B Division 04 17-Aug-2017 19-Aug-2017 8:30AM 21-Aug-2017 A Approved Closed
insulation 50mm polystyrene foam & cast in place window sills Zone
4B, Cluster 69, First floor

Installation of CMU Block work for perimeter and inner partition at


Ground floor Mockup Building Cluster 69 as highlighted drawing.
002 KHEP-AR-0002
With all block installation accessories and wall insulation 50mm
Cluster 69 Zone 4B Division 04 15-Aug-2017 16-Aug-2017 8:30AM 19-Aug-2017 E Rejected Closed
polystyrene foam Zone 4B, Cluster 69, Ground floor

Interior Wall Plastering at First Floor Including Dash coat and all
003 KHEP-AR-0003
related accessories Zone 4B, Cluster 69, First Floor
Cluster 69 Zone 4B Division 04 22-Aug-2017 23-Aug-2017 8:30AM 26-Aug-2017 A Approved Closed

Interior Wall Plastering at First Floor Including Dash coat and all
004 KHEP-AR-0004
related accessories Zone 4B, Cluster 69, First Floor
Cluster 69 Zone 4B Division 04 24-Aug-2017 26-Aug-2017 8:30AM 29-Aug-2017 A Approved Closed

Interior Wall dash coating and accessories for Ground Floor - Unit A
005 KHEP-AR-0005
Zone 4B, Cluster 69
Cluster 69 Zone 4B Division 04 26-Aug-2017 27-Aug-2017 8:30AM 29-Aug-2017 A Approved Closed

Installation of CMU wall and Concrete Coping For works at Roof Floor Approved w/
006 KHEP-AR-0006
Zone 4B, Cluster 69
Cluster 69 Zone 4B Division 04 6-Sep-2017 7-Sep-2017 8:30AM 9-Sep-2017 B comments
Closed

Approved w/
006.1 KHEP-AR-0006-01 Concrete coping formworks at Roof floor Zone 4B, Cluster 69 Cluster 69 Zone 4B Division 04 10-Sep-2017 11-Sep-2017 8:30AM 13-Sep-2017 B comments
Closed

007 KHEP-AR-0007 Interior Wall Plastering at Ground Floor Zone 4B, Cluster 69 Cluster 69 Zone 4B Division 04 6-Sep-2017 7-Sep-2017 9:00AM 9-Sep-2017 A Approved Closed
Exterior Wall dash Coating and accessories including preparation for
008 KHEP-AR-0008
exterior groove Zone 4B, Cluster 69
Cluster 69 Zone 4B Division 09 7-Sep-2017 9-Sep-2017 9:30AM 13-Sep-2017 A Approved Closed

009 KHEP-AR-0009 Installation of drywall at first floor Zone 4B, Cluster 69 Cluster 69 Zone 4B Division 09 12-Sep-2017 14-Sep-2017 10:00 AM RECALLED
Exterior Wall dash Coating and accessories at Roof Floor Zone 4B,
010 KHEP-AR-0010
Cluster 69
Cluster 69 Zone 4B Division 09 21-Sep-2017 23-Sep-2017 9:30AM 24-Sep-2017 A Approved Closed

Installation of drywall at Ground floor and First floor for Unit - A


011 KHEP-AR-0011 Including Rockwool insulation Zone Cluster 69 Zone 4B Division 09 24-Sep-2017 25-Sep-2017 9:00AM 28-Sep-2017 A Rejected Closed
4B, Cluster 69
Preparation for Floor Scree ding at First Floor Zone 4B, Cluster 69
012 KHEP-AR-0012 Cluster 69 Zone 4B Division 03 26-Sep-2017 27-Sep-2017 9:00AM 28-Sep-2017 A Approved Closed

Installation of Metal Ceiling system Zone 4B, Cluster 69, First floor
013 KHEP-AR-0013 Cluster 69 Zone 4B Division 09 28-Sep-2017 30-Sep-2017 8:30AM 3-Oct-2017 A Approved Closed

Plastering at roof floor exterior wall (Unit A & B) Zone 4B, Cluster 69,
014 KHEP-AR-0014
Roof floor
Cluster 69 Zone 4B Division 09 28-Sep-2017 30-Sep-2017 9:30AM 1-Oct-2017 A Approved Closed

Dash Coating at roof floor inner wall (Unit A & B) Zone 4B, Cluster
015 KHEP-AR-0015
69, Roof floor
Cluster 69 Zone 4B Division 09 28-Sep-2017 30-Sep-2017 10:30AM 1-Oct-2017 A Approved Closed

Plastering at roof floor inner wall (Unit A & B) Zone 4B, Cluster 69,
016 KHEP-AR-0016
Roof floor
Cluster 69 Zone 4B Division 09 30-Sep-2017 1-Oct-2017 9:00AM 3-Oct-2017 A Approved Closed

Concrete scree ding at First Floor (Unit A) Zone 4B, Cluster 69, First
017 KHEP-AR-0017
floor
Cluster 69 Zone 4B Division 03 1-Oct-2017 2-Oct-2017 8:30AM 4-Oct-2017 E Rejected Closed

Concrete scree ding at First Floor (Unit A) Zone 4B, Cluster 69, First
017.1 KHEP-AR-0017-01
floor
Cluster 69 Zone 4B Division 03 7-Oct-2017 8-Oct-2017 8:00AM 9-Oct-2017 A Approved Closed

Installation of Metal Studding for Grounding floor area cluster 69, B2 Approved w/
018 KHEP-AR-0018
Unit A only Zone 4B, Cluster 69, Ground floor
Cluster 69 Zone 4B Division 09 4-Oct-2017 5-Oct-2017 8:30AM 7-Oct-2017 B comments
Closed

Application of Water Proofing for Wet Areas at First Floor - Cluster


019 KHEP-AR-0019
69, B2 (Unit A) Zone 4B, Cluster 69, First floor
Cluster 69 Zone 4B Division 09 5-Oct-2017 7-Oct-2017 8:30AM 9-Oct-2017 E Rejected Closed

Application of Water Proofing for Wet Areas at First Floor - Cluster


019.1 KHEP-AR-0019-01
69, B2 (Unit A) Zone 4B, Cluster 69, First floor
Cluster 69 Zone 4B Division 03 10-Oct-2017 11-Oct-2017 8:30AM 15-Oct-2017 A Approved Closed
Mock up for External wall painting - Cluster 69, B2 (Unit A) Zone 4B,
020 KHEP-AR-0020
Cluster 69
Cluster 69 Zone 4B Division 09 7-Oct-2017 8-Oct-2017 8:30AM 11-Oct-2017 E Rejected Closed

Flood test for wet areas water Proofing - Cluster 69, B2 (Unit A)
021 KHEP-AR-0021
Zone 4B, Cluster 69
Cluster 69 Zone 4B Division 03 7-Oct-2017 8-Oct-2017 1:30PM 9-Oct-2017 E Rejected Closed

Re-Flood test for wet areas water Proofing - Cluster 69, B2 (Unit A)
021.1 KHEP-AR-0021-01
Zone 4B, Cluster 69
Cluster 69 Zone 4B Division 03 12-Oct-2017 14-Oct-2017 8:30AM 15-Oct-2017 A Approved Closed

Water Proofing surface preparation @ Roof Floor - Cluster 69, B2


022 KHEP-AR-0022
(Unit A) Zone 4B, Cluster 69
Cluster 69 Zone 4B Division 03 7-Oct-2017 8-Oct-2017 8:30AM 9-Oct-2017 A Approved Closed

Surface preparation for External wall painting - Cluster 69, B2 (Unit A


023 KHEP-AR-0023
& B) Zone 4B, Cluster 69
Cluster 69 Zone 4B Division 09 9-Oct-2017 10-Oct-2017 8:30AM 15-Oct-2017 A Approved Closed

Surface preparation for Internal wall painting - Cluster 69, B2 (Unit


024 KHEP-AR-0024
A) Zone 4B, Cluster 69
Cluster 69 Zone 4B Division 09 9-Oct-2017 10-Oct-2017 10:30AM 15-Oct-2017 E Rejected Closed

Surface preparation for Internal wall painting - Cluster 69, B2 (Unit


024.1 KHEP-AR-0024-01
A) Zone 4B, Cluster 69
Cluster 69 Zone 4B Division 09 21-Oct-2017 22-Oct-2017 10:30AM 25-Oct-2017 A Approved Closed

External wall painting - Cluster 69, B2 (Unit A & B) Zone 4B, Cluster
025 KHEP-AR-0025
69
Cluster 69 Zone 4B Division 09 9-Oct-2017 10-Oct-2017 8:30AM 15-Oct-2017 E Rejected Closed

026 KHEP-AR-0026 Internal wall painting - Cluster 69, B2 (Unit A) Zone 4B, Cluster 69 Cluster 69 Zone 4B Division 09 9-Oct-2017 10-Oct-2017 10:30AM 15-Oct-2017 E Rejected Closed

Internal wall painting, Primer Application - Cluster 69, B2 (Unit A)


026.1 KHEP-AR-0026-01
Zone 4B, Cluster 69
Cluster 69 Zone 4B Division 09 1-Nov-2017 2-Nov-2017 10:30AM 6-Nov-2017 A Approved Closed

Water proofing surface preparation at Roof floor - Cluster 69, B2


027 KHEP-AR-0027
(Unit A) 3rd phase - Flood test Zone 4B, Cluster 69, Roof Floor
Cluster 69 Zone 4B Division 03 19-Oct-2017 23-Oct-2017 2:30PM 26-Oct-2017 A Approved Closed

Water proofing surface preparation at Roof floor - Cluster 69, B2


(Unit A) 2nd phase - Light weight foam concrete Constrip,
028 KHEP-AR-0028
Membrane primer 4mm single layer, Skirting-Slated, Aluminum
Cluster 69 Zone 4B Division 03 19-Oct-2017 21-Oct-2017 8:30AM 26-Oct-2017 A Approved Closed
Flashing Zone 4B, Cluster 69, Roof Floor

Water proofing at wet areas for Ground Floor - Cluster 69, B2 (Unit
029 KHEP-AR-0029
A) Including Kitchen Zone 4B, Cluster 69, Ground Floor
Cluster 69 Zone 4B Division 03 21-Oct-2017 22-Oct-2017 8:30AM 26-Oct-2017 E Rejected Closed

Water proofing at wet areas for Ground Floor - Cluster 69, B2 (Unit Approved w/
029.1 KHEP-AR-0029-01
A) Zone 4B, Cluster 69, Ground Floor
Cluster 69 Zone 4B Division 03 2-Dec-2017 3-Dec-2017 8:30AM 11-Dec-2017 B comments
Closed

Water proofing at balconies for First Floor - Cluster 69, B2 (Unit A)


030 KHEP-AR-0030
Zone 4B, Cluster 69, First Floor
Cluster 69 Zone 4B Division 03 21-Oct-2017 22-Oct-2017 8:45AM 26-Oct-2017 E Rejected Closed

Water proofing at balconies for First Floor - Cluster 69, B2 (Unit A) Approved w/
030.1 KHEP-AR-0030-01
Zone 4B, Cluster 69, First Floor
Cluster 69 Zone 4B Division 03 2-Dec-2017 3-Dec-2017 8:45AM 11-Dec-2017 B comments
Closed

Installation of CMU wall outer perimeter wall layout - Cluster 15, B2


031 KHEP-AR-0031
(Unit A & B) Zone 1B, Cluster 15, B2, First Floor
Cluster 15 B2 Zone 1B Division 04 24-Oct-2017 25-Oct-2017 9:30AM 1-Nov-2017 E Rejected Closed

Installation of CMU wall outer perimeter wall layout - Cluster 15, B2


031.1 KHEP-AR-0031-01
(Unit A & B) Zone 1B, Cluster 15, B2, First Floor
Cluster 15 B2 Zone 1B Division 04 28-Nov-2017 29-Nov-2017 9:30AM 10-Dec-2017 E Rejected Closed

Installation of CMU wall outer perimeter wall layout 1st Layer -


Approved w/
031.2 KHEP-AR-0031-02 Cluster 15, B2 (Unit A & B) Excluding wall areas proposed Terracotta Cluster 15 B2 Zone 1B Division 04 25-Dec-2017 26-Dec-2017 8:30 AM 31-Dec-2017 B comments
Closed
cladding Zone 1B, Cluster 15, B2, First Floor

Installation of CMU wall until level of lintel beams - Cluster 15, B2


032 KHEP-AR-0032
Units A & B Zone 1B, Cluster 15, B2 First Floor
Cluster 15 B2 Zone 1B Division 04 1-Nov-2017 2-Nov-2017 9:30AM 6-Nov-2017 E Rejected Closed

Installation of CMU wall outer perimeter wall layout - Cluster 14, B2


033 KHEP-AR-0033
Units A & B Zone 1B, Cluster 15, B2 First Floor
Cluster 14 B2 Zone 1B Division 04 1-Nov-2017 2-Nov-2017 8:30AM 6-Nov-2017 E Rejected Closed

Installation of CMU wall outer perimeter wall layout - Cluster 14, B2


033.1 KHEP-AR-0033-01
Units A & B Zone 1B, Cluster 15, B2 First Floor
Cluster 14 B2 Zone 1B Division 04 28-Nov-2017 29-Nov-2017 10:00AM 10-Dec-2017 E Rejected Closed

Installation of CMU wall outer perimeter wall layout first layer


Approved w/
033.2 KHEP-AR-0033-02 Cluster 14, B2 Units A & B Excluding wall areas proposed Terracotta Cluster 14 B2 Zone 1B Division 04 25-Dec-2017 26-Dec-2017 9:00 AM 31-Dec-2017 B comments
Closed
cladding Zone 1B, Cluster 14, B2 First Floor

Internal wall painting, First coating - Cluster 69, B2 (Unit A) Zone 4B,
034 KHEP-AR-0034
Cluster 69
Cluster 69 Zone 4B Division 09 1-Nov-2017 4-Nov-2017 8:30AM 6-Nov-2017 A Approved Closed

Installation of CMU wall outer perimeter wall layout - Cluster 13, B2


035 KHEP-AR-0035
Units A & B Zone 1B, Cluster 13, B2 First Floor
Cluster 13 B2 Zone 1B Division 04 4-Nov-2017 5-Nov-2017 8:30AM 7-Nov-2017 E Rejected Closed

Installation of CMU wall outer perimeter wall layout first layer


035.1 KHEP-AR-0035-01 Cluster 13, B2 Units A & B Excluding wall areas proposed Terracotta Cluster 13 B2 Zone 1B Division 04 25-Dec-2017 26-Dec-2017 9:30 AM 31-Dec-2017 A Approved Closed
cladding Zone 1B, Cluster 14, B2 First Floor

Interior Wall Dash Coating and Accessories for Ground Floor - Unit B
036 KHEP-AR-0036
Zone 4B, Cluster 69, GroundFloor
Cluster 69 Zone 4B Division 09 5-Nov-2017 6-Nov-2017 8:30AM 9-Nov-2017 A Approved Closed

Preparation for Floor Screeding elevation at First Floor - Unit B


037 KHEP-AR-0037
(Excluding wet areas and Balconies) Zone 4B, Cluster 69, First Floor
Cluster 69 Zone 4B Division 03 5-Nov-2017 6-Nov-2017 9:30AM 9-Nov-2017 A Approved Closed
Interior Wall plastering at Ground Floor - Unit B Zone 4B, Cluster 69, Approved w/
038 KHEP-AR-0038
Ground Floor
Cluster 69 Zone 4B Division 09 5-Nov-2017 9-Nov-2017 9:00AM 9-Nov-2017 B comments
Closed

Preparation for Floor Screeding Elevation at First Floor Zone 1B,


039 KHEP-AR-0039
Cluster 15, First Floor
Cluster 15 Zone 1B Division 03 22-Nov-2017 23-Nov-2017 10:00AM 25-Nov-2017 A Approved Closed

Concrete Floor Screeding for First Floor Cluster 69, B2 - Unit B


040 KHEP-AR-0040
(Excluding Wet areas and Balconies) Zone 4B, Cluster 69, First Floor
Cluster 69 Zone 4B Division 03 22-Nov-2017 23-Nov-2017 10:30AM 25-Nov-2017 A Approved Closed

Preparation for Floor Screeding elevation at Ground Floor - Cluster


041 KHEP-AR-0041
69, B2 Unit B Zone 4B, Cluster 69, Ground Floor
Cluster 69 Zone 4B Division 03 2-Dec-2017 3-Dec-2017 10:00AM 11-Dec-2017 A Approved Closed

Concrete Screeding Pouring at First Floor Cluster 15, B2 - Unit A & B


042 KHEP-AR-0042
(Excluding Wet areas and Balconies) Zone 1B, Cluster 15, First Floor
Cluster 15 Zone 1B Division 03 5-Dec-2017 6-Dec-2017 9:30AM 12-Dec-2017 A Approved Closed

Concrete Screeding Pouring at Ground Floor Cluster 69, B2 - Unit B


043 KHEP-AR-0043
(Excluding Wet areas and Garage) Zone 4B, Cluster 69, Ground Floor
Cluster 69 Zone 4B Division 03 5-Dec-2017 6-Dec-2017 10:00AM 12-Dec-2017 A Approved Closed

Installation of External CMU wall (200mm thik Block) until soffit of


044 KHEP-AR-0044 Roof Beam with 3 Layers of inner wall (100mm thik Block) Cluster Cluster 01 Zone 1A Division 04 5-Dec-2017 6-Dec-2017 2:30PM 13-Dec-2017 E Rejected Closed
A6, Untis A,B,C,D,E& F Zone 1A, Cluster 1, First Floor

Installation of CMU wall from 2nd Layer to Level of Lintel Beam Soffit
044.1 KHEP-AR-0044-01 Cluster 1 A6 Unit A,B,C,D,E & F Excluding wall Areas for Terracotta Cluster 01 A6 Zone 1B Division 04 15-Jan-2018 16-Jan-2018 9:00 AM 20-Jan-2018 A Approved Closed
Cladding & some External balcony walls

Installation of Metal studdings (Drywall) and one (1) phase of Approved w/


045 KHEP-AR-0045
gypsum wall for first floor Zone 4B, Cluster 69, B2 First Floor
Cluster 69 Zone 4B Division 09 7-Dec-2017 9-Dec-2017 8:30AM 11-Dec-2017 B comments
Closed

Preparation for Floor Screeding elevation at First Floor - Cluster 14,


046 KHEP-AR-0046
B2 Excluding wet areas and balconies Zone 1B, Cluster 14, First Floor
Cluster 14 B2 Zone 1B Division 03 12-Dec-2017 13-Dec-2017 10:00AM 16-Dec-2017 A Approved Closed

Application of Water Proofing for Wet Areas at First Floor - Cluster


047 KHEP-AR-0047 69, B2 (Unit B,) surface preparation & primer Zone 4B, Cluster 69, Cluster 69 B2 Zone 4B Division 03 10-Jan-2018 11-Jan-2018 8:30 AM 15-Jan-2018 A Approved Closed
First floor

Application of Water Proofing for Wet Areas at First Floor - (Unit B)


048 KHEP-AR-0048
Cluster 69 first coat application Zone 4B, Cluster 69, First floor
Cluster 69 Zone 4B Division 03 10-Jan-2018 11-Jan-2018 10:30 AM 15-Jan-2018 A Approved Closed

049 KHEP-AR-0049 Concrete screed Pouring at first floor Cluster14, B2 Unit A&B Cluster 14 Unit A & B Division 03 20-Dec-2017 21-Dec-2017 10:00 AM 24-Dec-2017 A Approved Closed
Installation of Metal studdings (Drywall) and one (1) phase of
Approved w/
050 KHEP-AR-0050 gypsum wall forGrgound floor Cluster 69, B2 Unit B Zone 4B, Cluster Cluster 69 B2 Zone 4B Division 09 21-Dec-2017 23-Dec-2017 8:30 AM 27-Dec-2017 B comments
Closed
69
Intallation of CMU wall at Roof Floor Cluster 15, B2 Units A & B Zone Approved w/
051 KHEP-AR-0051
1B, Cluster 15, B2
Cluster 15 B2 Zone 1B Division 04 21-Dec-2017 23-Dec-2017 11:00 AM 27-Dec-2017 B comments
Closed

Installation of External / Perimeter wall first Layer Excluding wall


Approved w/
052 KHEP-AR-0052 areas for Terracotta cladding Zone 1A, Cluster 01, A6 Units A,B,C,D,E Cluster 01 A6 Zone 1A Division 04 25-Dec-2017 26-Dec-2017 10:00 AM 31-Dec-2017 B comments
Closed
&F
Installation of External / Perimeter wall first Layer Excluding wall
Approved w/
053 KHEP-AR-0053 areas for Terracotta cladding Zone 1A, Cluster 02, A6 Units A,B,C,D,E Cluster 02 A6 Zone 1A Division 04 25-Dec-2017 26-Dec-2017 10:30 AM 31-Dec-2017 B comments
Closed
&F

Installation of External / Perimeter wall first Layer Excluding wall Approved w/


054 KHEP-AR-0054
areas for Terracotta cladding Zone 1A, Cluster 05, B2 Units A,B
Cluster 05 B2 Zone 1A Division 04 25-Dec-2017 26-Dec-2017 11:00 AM 31-Dec-2017 B comments
Closed

Intallation of CMU wall outer perimeter wall first layer Excluding wall Approved w/
055 KHEP-AR-0055
area for Terracotta Cladding Cluster 10 B2 Unit A,B
Cluster 10 B2 Unit A,B Division 04 27-Dec-2017 28-Dec-2017 8:00 AM 31-Dec-2017 B comments
Closed

Intallation of CMU wall outer perimeter wall first layer Excluding wall Approved w/
056 KHEP-AR-0056
area for Terracotta Cladding Cluster 11 B2 Zone 1B
Cluster 11 B2 Zone 1B Division 04 27-Dec-2017 28-Dec-2017 8:30 AM 31-Dec-2017 B comments
Closed

Intallation of CMU wall outer perimeter wall first layer Excluding wall Approved w/
057 KHEP-AR-0057
area for Terracotta Cladding Cluster 12 B2 Zone 1B
Cluster 12 B2 Zone 1B Division 04 27-Dec-2017 28-Dec-2017 9:00 AM 31-Dec-2017 B comments
Closed

Intallation of CMU wall outer perimeter wall first layer Excluding wall Approved w/
058 KHEP-AR-0058
area for Terracotta Cladding Cluster 17 Zone 1B
Cluster 17 Zone 1B Division 04 27-Dec-2017 28-Dec-2017 9:30 AM 31-Dec-2017 B comments
Closed

Intallation of CMU wall outer perimeter wall first layer Excluding wall Approved w/
059 KHEP-AR-0059
area with Proposed Terracotta Cladding Cluster 1 Zone 1A
Cluster 01 Zone 1A Division 04 27-Dec-2017 28-Dec-2017 10:00 AM 31-Dec-2017 B comments
Closed
Intallation of CMU wall outer perimeter wall first layer Excluding wall Approved w/
060 KHEP-AR-0060
area with Proposed Terracotta Cladding Cluster 15 Zone 1A
Cluster 15 Zone 1A Division 04 27-Dec-2017 28-Dec-2017 10:30 AM 31-Dec-2017 B comments
Closed

Installation of CMU wall from 2nd Layer to Level of Lintel Beam Soffit
061 KHEP-AR-0061 Cluster 2 A6 Unit A,B,C,D,E & F Excluding wall Areas for Terracotta Cluster 02 Zone 1B Division 04 30-Dec-2017 31-Dec-2017 8:00 AM RECALLED
Cladding

Installation of CMU wall from 2nd Layer to Level of Lintel Beam Soffit Approved w/
062 KHEP-AR-0062
Cluster 15 B2 Unit A & B Excluding wall Areas for Terracotta Cladding
Cluster 15 B2 Zone 1B Division 04 30-Dec-2017 31-Dec-2017 8:30 AM 3-Jan-2018 B comments
Closed

Installation of CMU wall from 2nd Layer to Level of Lintel Beam Soffit Approved w/
063 KHEP-AR-0063
Cluster 14 B2 Unit A & B Excluding wall Areas for Terracotta Cladding
Cluster 14 B2 Zone 1B Division 04 30-Dec-2017 31-Dec-2017 9:00 AM 3-Jan-2018 B comments
Closed

Installation of CMU wall from 2nd Layer to Level of Lintel Beam Soffit Approved w/
064 KHEP-AR-0064
Cluster 13 B2 Unit A & B Excluding wall Areas for Terracotta Cladding
Cluster 13 B2 Zone 1B Division 04 30-Dec-2017 31-Dec-2017 9:30 AM 3-Jan-2018 B comments
Closed

Installation of CMU wall from 2nd Layer to Level of Lintel Beam Soffit Approved w/
065 KHEP-AR-0065
Cluster 12 B2 Unit A & B Excluding wall Areas for Terracotta Cladding
Cluster 12 B2 Zone 1B Division 04 8-Jan-2018 9-Jan-2018 11:00 AM 15-Jan-2018 B comments
Closed

Installation of CMU wall from 2nd Layer to Level of Lintel Beam Soffit Approved w/
066 KHEP-AR-0066
Cluster 11 B2 Unit A & B Excluding wall Areas for Terracotta Cladding
Cluster 11 B2 Zone 1B Division 04 30-Dec-2017 31-Dec-2017 11:00 AM 3-Jan-2018 B comments
Closed

Installation of CMU wall from 2nd Layer to Level of Lintel Beam Soffit Approved w/
067 KHEP-AR-0067
Cluster 10 B2 Unit A & B Excluding wall Areas for Terracotta Cladding
Cluster 10 B2 Zone 1B Division 04 31-Dec-2017 1-Jan-2018 10:00 AM 4-Jan-2018 B comments
Closed

Installation of CMU wall from 2nd Layer to Level of Lintel Beam Soffit Approved w/
068 KHEP-AR-0068
Cluster 5 B2 Unit A & B Excluding wall Areas for Terracotta Cladding
Cluster 05 B2 Zone 1B Division 04 31-Dec-2017 1-Jan-2018 10:30 AM 4-Jan-2018 B comments
Closed

Installation of CMU wall from 2nd Layer to Level of Lintel Beam Soffit Approved w/
069 KHEP-AR-0069
Cluster 17 B2 Unit A & B Excluding wall Areas for Terracotta Cladding
Cluster 17 B2 Zone 1B Division 04 31-Dec-2017 1-Jan-2018 11:00 AM 4-Jan-2018 B comments
Closed

Preparation for Floor Screeding Elevation at Ground Floor Cluster 69


070 KHEP-AR-0070
B2 Garage Area Zone 4B Cluster 69
Cluster 69 Zone 4B Division 03 31-Dec-2017 1-Jan-2018 1:30 AM 4-Jan-2018 A Approved Closed

Installation of CMU wall at Roof Floor Cluster 8 B2 Units A&B Zone


071 KHEP-AR-0071
1B Cluster 8
Cluster 08 Zone 1B Division 04 4-Jan-2018 6-Jan-2018 9:00 AM 7-Jan-2018 A Approved Closed

Preparation for Concrete screed level guide at First Floor Cluster 1 A6


072 KHEP-AR-0072
Units D,E & F Zone 1B Cluster 1
Cluster 01 Zone 1B Division 03 4-Jan-2018 6-Jan-2018 9:30 AM 7-Jan-2018 A Approved Closed

Concrete Floor Screeding for Ground Floor Garage area Cluster 69 B2


073 KHEP-AR-0073
Unit B Zone 4B Cluster 69
Cluster 69 Zone 4B Division 03 4-Jan-2018 6-Jan-2018 8:30 AM 7-Jan-2018 A Approved Closed

Installation of CMU wall at Roof Floor Cluster 14 B2 Units A&B Zone


074 KHEP-AR-0074
1B Cluster 14
Cluster 14 Zone 1B Division 04 4-Jan-2018 6-Jan-2018 2:00 PM 7-Jan-2018 A Approved Closed

Gypsum wall board Enclosure for Drywalls at first floor Cluster 69 B2


075 KHEP-AR-0075
Unit B Zone 4B
Cluster 69 B2 Zone 4B Division 09 7-Jan-2018 8-Jan-2018 8:30 AM 10-Jan-2018 A Approved Closed

Installation of CMU wall outer permeter wall first layer Cluster 7 B2


Approved w/
076 KHEP-AR-0076 Unit A & B first floor Excluding wall Areas for Terracotta Cladding Cluster 07 B2 Zone 1B Division 04 8-Jan-2018 9-Jan-2018 8:30 AM 15-Jan-2018 B comments
Closed
Zone 1B
Installation of CMU wall outer permeter wall first layer Cluster 8 B2
Approved w/
077 KHEP-AR-0077 Unit A & B first floor Excluding wall Areas for Terracotta Cladding Cluster 08 B2 Zone 1B Division 04 8-Jan-2018 9-Jan-2018 9:00 AM 15-Jan-2018 B comments
Closed
Zone 1B
Preparation for Floor screed elevation guide at first floor Cluster 13
078 KHEP-AR-0078
B2 Excluding wet areas & balconies Zone 1B
Cluster 13 Zone 1B Division 03 8-Jan-2018 9-Jan-2018 10:00 AM 15-Jan-2018 A Approved Closed

079 KHEP-AR-0079 Installation of CMU wall at roof floor Cluster 5 Zone 1B Cluster 05 Zone 1B Division 04 8-Jan-2018 9-Jan-2018 9:30 AM 15-Jan-2018 A Approved Closed
Installation of CMU wall for terracotta cladding,first layer of first floor
080 KHEP-AR-0080
Cluster 15 B2 Zone 1B Unit A&B
Cluster 15 B2 Zone 1B Division 04 9-Jan-2018 10-Jan-2018 3:30 PM 15-Jan-2018 E Rejected Closed

Installation of CMU wall for terracotta cladding,first layer of first floor


080.1 KHEP-AR-0080-01
Cluster 15 B2 Zone 1B Unit A&B
Cluster 15 B2 Zone 1B Division 04 17-Jan-2018 18-Jan-2018 8:30 AM 22-Jan-2018 A Approved Closed

Preparation for Concrete screed level guide at First Floor Cluster 1 A6


081 KHEP-AR-0081
Units A,B & C Zone 1B Cluster 1
Cluster 01 Zone 1B Division 03 9-Jan-2018 10-Jan-2018 8:30 AM 15-Jan-2018 A Approved Closed

Concrete screed Pouring at first floor Cluster13, B2 Zone 1B


082 KHEP-AR-0082
Excluding wet areas & Balconies
Cluster 13 Zone 1B Division 03 9-Jan-2018 10-Jan-2018 9:00 AM 15-Jan-2018 A Approved Closed

Concrete Screed pouring at first floor except wet areas & Balconies
083 KHEP-AR-0083
Cluster 1 A6 Units ABCDE & F Zone 1B
Cluster 01 A6 Zone 1B Division 03 10-Jan-2018 11-Jan-2018 8:00 AM 15-Jan-2018 A Approved Closed

Preparation for Floor Screeding elevation guide at First Floor Cluster


084 KHEP-AR-0084
12 B2 Excluding wet areas & Balconies Zone 1B
Cluster 12 B2 Zone 1B Division 03 11-Jan-2018 13-Jan-2018 9:00 AM 15-Jan-2018 A Approved Closed

Application of Water Proofing for wet areas at first floor unit B


085 KHEP-AR-0085
Cluster 69 Final Coat Application Cluster 69 Zone 4B
Cluster 69 Zone 4B Division 03 13-Jan-2018 14-Jan-2018 8:30 AM 21-Jan-2018 A Approved Closed
Concrete Screed Pouring at First Floor Cluster 12 B2 Excluding wet
086 KHEP-AR-0086
areas & balconies Zone 1B
Cluster 12 B2 Zone 1B Division 03 14-Jan-2018 15-Jan-2018 9:00 AM 20-Jan-2018 A Approved Closed

Application of water Proofing for wet areas at first floor unit B Cluster
087 KHEP-AR-0087
69 Flood Test Zone 4B
Cluster 69 Zone 4B Division 03 14-Jan-2018 15-Jan-2018 8:30 AM 20-Jan-2018 A Approved Closed

Interior wall dash coating including plastering accessories installation Approved w/


088 KHEP-AR-0088
& vertical level guides Cluster 15 B2 unit A&B First Floor
Cluster 15 B2 Zone 1B Division 09 15-Jan-2018 16-Jan-2018 9:30 AM 20-Jan-2018 B comments
Closed

Epoxy Paint Sample Color matte finish only size 1.5x7mts Garage Approved w/
089 KHEP-AR-0089
Cluster 69 B2 Unit A Zone 4B
Cluster 69 B2 Zone 4B Division 09 15-Jan-2018 15-Jan-2018 8:30 AM 20-Jan-2018 B comments
Closed

090 KHEP-AR-0090 Installation of CMU wall at roof floor Cluster 7 B2 Unit A & B Zone 1B Cluster 07 Zone 1B Division 04 15-Jan-2018 16-Jan-2018 10:00 AM 20-Jan-2018 A Approved Closed

Installation of Lintel Beams for External CMU walls Cluster 15 Zone


091 KHEP-AR-0091
1B Unit A&B
Cluster 15 Zone 1B Division 3 16-Jan-2018 17-Jan-2018 8:30 AM 20-Jan-2018 A Approved Closed

Installation of Lintel Beams for External CMU walls Cluster 14 Zone


092 KHEP-AR-0092
1B Unit A&B
Cluster 14 Zone 1B Division 3 16-Jan-2018 17-Jan-2018 9:30 AM 20-Jan-2018 A Approved Closed

Installation of Lintel Beams for External CMU walls Cluster 13 Zone


093 KHEP-AR-0093
1B Unit A&B
Cluster 13 Zone 1B Division 3 16-Jan-2018 17-Jan-2018 10:00 AM 20-Jan-2018 A Approved Closed

Preparation for Floor screed elevation guide at first floor Cluster 11


094 KHEP-AR-0094
B2 Excluding wet areas & balconies Zone 1B
Cluster 11 B2 Zone 1B Division 3 16-Jan-2018 17-Jan-2018 10:30 AM 20-Jan-2018 A Approved Closed

Lintel Beam Installation for CMU external walls Cluster 12 B2 unit


095 KHEP-AR-0095
A&B Excluding walls with Terracotta Cladding Zone 1B
Cluster 12 B2 Zone 1B Division 3 16-Jan-2018 17-Jan-2018 9:00 AM 20-Jan-2018 A Approved Closed

Lintel Beam Installation for CMU external walls Cluster 1 A6 unit A&F
096 KHEP-AR-0096
Excluding walls with Terracotta Cladding Zone 1B
Cluster 01 A6 Zone 1B Division 3 16-Jan-2018 17-Jan-2018 8:00 AM 20-Jan-2018 A Approved Closed

097 KHEP-AR-0097 Installation of cmu wall at roof floor unit A&B Zone 1B Cluster 11 Cluster 11 Zone 1B Division 4 17-Jan-2018 18-Jan-2018 9:00 AM 21-Jan-2018 A Approved Closed

Preparation of floor screed elevation guide at ground floor Cluster 69


098 KHEP-AR-0098
B2 unit A garage area Zone 4B
Cluster 69 B2 Zone 4B Division 3 17-Jan-2018 18-Jan-2018 8:30 AM 21-Jan-2018 A Approved Closed

Pouring of concrete screed for first floor Excluding wet areas &
099 KHEP-AR-0099
balconies Cluster 11 B2 unit A&B Zone 1B
Cluster 11 B2 Zone 1B Division 3 18-Jan-2018 20-Jan-2018 9:30 AM 21-Jan-2018 A Approved Closed

Installation of metal ceiling system for first floor see mark up


0100 KHEP-AR-0100
drawing Zone 4B Cluster 69
Cluster 69 Zone 4B Division 9 18-Jan-2018 20-Jan-2018 10:00 AM 27-Jan-2018 A Approved Closed

Installation of CMU wall at roof floor Cluster 10 B2 unit A & B Zone


0101 KHEP-AR-0101
1B
Cluster 10 B2 Zone 1B Division 4 21-Jan-2018 22-Jan-2018 10:00 AM 23-Jan-2018 A Approved Closed

Installation of CMU wall at roof floor Cluster 13 B2 unit A & B Zone


0102 KHEP-AR-0102
1B
Cluster 13 B2 Zone 1B Division 4 21-Jan-2018 22-Jan-2018 2:00 PM 23-Jan-2018 A Approved Closed

Preparation for floor screed elevation guide at first floor Cluster 10


0103 KHEP-AR-0103
B2 unit A & B Zone 1B
Cluster 10 B2 Zone 1B Division 3 21-Jan-2018 22-Jan-2018 2:30 PM 23-Jan-2018 A Approved Closed

Dry wall partition installation enclosure at ground floor Cluster 69 B2


0104 KHEP-AR-0104
Unit B Zone 4B
Cluster 69 B2 Zone 4B Division 9 21-Jan-2018 22-Jan-2018 8:30 AM 23-Jan-2018 A Approved Closed

Water proofing surface preparation with cant strip & base primer
0105 KHEP-AR-0105
ground floor Cluster 69 Unit B wet areas Zone 4B
Cluster 69 B2 Zone 4B Division 3 21-Jan-2018 22-Jan-2018 8:30 AM 23-Jan-2018 A Approved Closed

Installation of CMU wall for terracotta cladding,first layer of first floor


0106 KHEP-AR-0106
Cluster 11 B2 Zone 1B Unit A & B
Cluster 11 B2 Zone 1B Division 4 21-Jan-2018 22-Jan-2018 9:30 AM 23-Jan-2018 A Approved Closed

Installation of CMU wall for terracotta cladding,first layer of first floor


0107 KHEP-AR-0107
Cluster 14 B2 Zone 1B Unit A & B
Cluster 14 B2 Zone 1B Division 4 21-Jan-2018 22-Jan-2018 8:30 AM 23-Jan-2018 A Approved Closed

Installation of CMU wall for terracotta cladding,first layer of first floor


0108 KHEP-AR-0108
Cluster 13 B2 Zone 1B Unit A & B
Cluster 13 B2 Zone 1B Division 4 21-Jan-2018 22-Jan-2018 8:45 AM 23-Jan-2018 A Approved Closed

Installation of CMU wall for terracotta cladding,first layer of first floor


0109 KHEP-AR-0109
Cluster 12 B2 Zone 1B Unit A & B
Cluster 12 B2 Zone 1B Division 4 21-Jan-2018 22-Jan-2018 9:00 AM 23-Jan-2018 A Approved Closed

Water proofing first coating for liquid membrane ground floor Cluster Approved w/
0110 KHEP-AR-0110
69 unit B wet areas
Cluster 69 Zone 4B Division 3 22-Jan-2018 23-Jan-2018 8:00 AM 24-Jan-2018 B comments
Closed

Water proofing surface preparation with cant strip & primer first floor Approved w/
0111 KHEP-AR-0111
Cluster 69 Unit B balconies Zone 4B
Cluster 69 Zone 4B Division 3 22-Jan-2018 23-Jan-2018 8:30 AM 24-Jan-2018 B comments
Closed

Installation of external perimeter wall first layer Cluster 2 A6 Zone 1A


0112 KHEP-AR-0112 unit A,B,C,D,E & F excluding wall areas with proposed terracotta Cluster 02 A6 Zone 1A Division 3 23-Jan-2018 24-Jan-2018 8:30 AM 25-Jan-2018 E Rejected Closed
cladding
CMU laying from 2nd layer to level of lintel beam soffit Cluster 1 A6
0113 KHEP-AR-0113 unit A,B,C,D,E & F ground floor including wall areas for terracotta Cluster 01 A6 Zone 1B Division 4 23-Jan-2018 24-Jan-2018 9:00 AM 24-Jan-2018 E Rejected Closed
cladidng Zone 1B
CMU laying from 2nd layer to level of lintel beam soffit Cluster 1 A6
0113.1 KHEP-AR-0113-01 unit A,B,C,D,E & F ground floor excluding wall areas for terracotta Cluster 01 A6 Zone 1B Division 4 28-Jan-2018 29-Jan-2018 8:00 AM 31-Jan-2018 A Approved Closed
cladidng Zone 1B
CMU laying from 2nd layer to level of lintel beam soffit Cluster 2 A6
0114 KHEP-AR-0114 unit A,B,C,D,E & F first floor excluding wall areas for terracotta Cluster 02 A6 Zone 1B Division 4 23-Jan-2018 24-Jan-2018 9:30 AM 24-Jan-2018 E Rejected Closed
cladidng Zone 1B
CMU laying from 2nd layer to level of lintel beam soffit Cluster 2 A6
0114.1 KHEP-AR-0114-01 unit A,B,C,D,E & F first floor excluding wall areas for terracotta Cluster 02 A6 Zone 1B Division 4 28-Jan-2018 29-Jan-2018 11:00 AM 31-Jan-2018 A Approved Closed
cladidng Zone 1B

CMU laying from 2nd layer to level of lintel beam soffit Cluster 7 unit
0115 KHEP-AR-0115
A & B first floor including wall areas for terracotta cladidng Zone 1B
Cluster 07 Zone 1B Division 4 23-Jan-2018 24-Jan-2018 10:00 AM 24-Jan-2018 E Rejected Closed

CMU laying from 2nd layer to level of lintel beam soffit Cluster 7 unit
0115.1 KHEP-AR-0115-01
A & B first floor excluding wall areas for terracotta cladidng Zone 1B
Cluster 07 Zone 1B Division 4 28-Jan-2018 29-Jan-2018 8:30 AM 31-Jan-2018 A Approved Closed

CMU laying from 2nd layer to level of lintel beam soffit Cluster 8 B2
0116 KHEP-AR-0116 unit A & B first floor including wall areas for terracotta cladidng Zone Cluster 08 Zone 1B Division 4 23-Jan-2018 24-Jan-2018 10:30 AM 24-Jan-2018 E Rejected Closed
1B

Installation of external perimeter wall first layer Cluster 19 B2 Zone


0117 KHEP-AR-0117
1A unit A & B including wall areas with proposed terracotta cladding
Cluster 19 B2 Zone 1A Division 4 23-Jan-2018 24-Jan-2018 11:00 AM 25-Jan-2018 E Rejected Closed

Preparation for concrete screed level guide at ground floor Cluster 1


0118 KHEP-AR-0118
A6 unit A to F Zone 1B
Cluster 01 A6 Zone 1B Division 3 23-Jan-2018 24-Jan-2018 1:30 PM 24-Jan-2018 A Approved Closed

CMU laying from 2nd layer to level of lintel beam soffit Cluster 2 A6
0119 KHEP-AR-0119 Cluster 02 A6 Zone 1B Division 4 24-Jan-2018 25-Jan-2018 8:30 AM RECALLED
unit A,B,C,D,E & F ground floor Zone 1B
Lintel beam installation for external walls Cluster 1 A6 unit A to F
0120 KHEP-AR-0120 ground floor excluding lintel beams for walls with terracotta cladding Cluster 01 A6 Zone 1B Division 3 24-Jan-2018 25-Jan-2018 9:00 AM 28-Jan-2018 A Approved Closed
& garage doors Zone 1B
Lintel beam installation for external walls Cluster 10 B2 unit A to B
0121 KHEP-AR-0121 first floor excluding lintel beams for walls with terracotta cladding Cluster 10 B2 Zone 1B Division 4 24-Jan-2018 25-Jan-2018 9:30 AM 28-Jan-2018 A Approved Closed
Zone 1B
Lintel beam installation for external walls Cluster 11 B2 unit A to B
0122 KHEP-AR-0122 first floor excluding lintel beams for walls with terracotta cladding Cluster 11 B2 Zone 1B Division 4 24-Jan-2018 25-Jan-2018 10:00 AM 28-Jan-2018 A Approved Closed
Zone 1B
Concrete screed pouring at first floor Cluster 10 B2 unit A & B Zone
0123 KHEP-AR-0123
1B
Cluster 10 B2 Zone 1B Division 4 24-Jan-2018 25-Jan-2018 10:30 AM 28-Jan-2018 A Approved Closed

Approved w/
0124 KHEP-AR-0124 Painting for interior walls surface preparation Zone 4B Cluster 69 Cluster 69 Zone 4B Division 9 25-Jan-2018 27-Jan-2018 8:30 AM 30-Jan-2018 B comments
Closed

Painting for interior walls surface preparation Ground floor Zone 4B Approved w/
0125 KHEP-AR-0125
Cluster 69
Cluster 69 Zone 4B Division 9 25-Jan-2018 27-Jan-2018 9:30 AM 30-Jan-2018 B comments
Closed

Concrete screed pouring at ground floor Cluster 1 A6 Zone 1B unit A-


0126 KHEP-AR-0126
F
Cluster 01 A6 Zone 1B Division 9 25-Jan-2018 27-Jan-2018 10:30 AM 30-Jan-2018 A Approved Closed

Installation of metal ceiling system ground floor Cluster 69 unit B Approved w/


0127 KHEP-AR-0127
Zone 4B
Cluster 69 Zone 4B Division 9 28-Jan-2018 29-Jan-2018 9:00 AM 31-Jan-2018 B comments
Closed

Painting for external walls primer application ground floor first floor &
0128 KHEP-AR-0128
roof floor unit A & B Cluster 69 Zone 4B
Cluster 69 Zone 4B Division 9 28-Jan-2018 29-Jan-2018 9:30 AM 31-Jan-2018 A Approved Closed

Water proofing second coating of liquid membrane ground floor Approved w/


0129 KHEP-AR-0129
Cluster 69 unit B wet areas
Cluster 69 Zone 4B Division 3 30-Jan-2018 31-Jan-2018 8:00 AM 31-Jan-2018 B comments
Closed

Installatio of CMU walls for terracotta cladding first layer of ground


0130 KHEP-AR-0130
floor Cluster 15 B2 unit A-B Ground floor Zone 1B
Cluster 15 Zone 1B Division 4 31-Jan-2018 1-Feb-2018 8:00 AM 3-Feb-2018 E Rejected Closed

Installatio of CMU walls for terracotta cladding first layer of ground Approved w/
0130.1 KHEP-AR-0130-01
floor Cluster 15 B2 unit A-B Ground floor Zone 1B
Cluster 15 Zone 1B Division 4 21-Feb-2018 22-Feb-2018 9:30 AM 24-Feb-2018 B comments
Open

Primer application prior 1st coating for interior walls Cluster 69


0131 KHEP-AR-0131
ground floor unit B Zone 4B
Cluster 69 Zone 4B Division 9 31-Jan-2018 1-Feb-2018 8:30 AM 4-Feb-2018 A Approved Closed

Primer application prior 1st coating for interior walls Cluster 69 first
0132 KHEP-AR-0132
floor unit B Zone 4B
Cluster 69 Zone 4B Division 9 31-Jan-2018 1-Feb-2018 9:00 AM 4-Feb-2018 A Approved Closed

Installation of level guides for concrete screeding Cluster 5 B2 unit A-


0133 KHEP-AR-0133
B first floor excluding wet areas & balconies Zone 1B
Cluster 05 Zone 1B Division 4 4-Feb-2018 5-Feb-2018 8:00 AM 6-Feb-2018 A Approved Closed

0134 KHEP-AR-0134 Installation of CMU wall at roof floor Cluster 12 B2 unit A-B Zone 1B Cluster 12 B2 Zone 1B Division 4 4-Feb-2018 5-Feb-2018 9:00 AM RECALLED

Installation of lintel beams for external CMU walls Cluster 5 B2 unit


0135 KHEP-AR-0135
A-B first floor excluding walls for terracotta cladding Zone 1B
Cluster 05 B2 Zone 1B Division 4 4-Feb-2018 5-Feb-2018 8:30 AM 6-Feb-2018 A Approved Closed

0136 KHEP-AR-0136 Installation of CMU wall at roof floor Cluster 19 B2 unit A-B Zone 1B Cluster 19 B2 Zone 1B Division 4 4-Feb-2018 6-Feb-2018 8:00 AM RECALLED Open

0137 KHEP-AR-0137 Installation of CMU wall at roof floor Cluster 20 B2 unit A-B Zone 1B Cluster 20 B2 Zone 1B Division 4 4-Feb-2018 6-Feb-2018 8:30 AM RECALLED Open

0138 KHEP-AR-0138 Installation of CMU wall at roof floor Cluster 27 B2 unit A-B Zone 2B Cluster 27 B2 Zone 2B Division 4 4-Feb-2018 6-Feb-2018 9:00 AM RECALLED Open

0139 KHEP-AR-0139 Installation of CMU wall at roof floor Cluster 68 B2 unit A-B Zone 4B Cluster 68 B2 Zone 4B Division 4 4-Feb-2018 6-Feb-2018 9:30 AM RECALLED Open
Application of 1st coating for interior walls Cluster 69 first floor unit B
0140 KHEP-AR-0140
Zone 4B
Cluster 69 Zone 4B Division 9 5-Feb-2018 6-Feb-2018 8:30 AM 7-Feb-2018 A Approved Closed

Application of 1st coating for interior walls Cluster 69 ground floor


0141 KHEP-AR-0141
unit B Zone 4B
Cluster 69 Zone 4B Division 9 5-Feb-2018 6-Feb-2018 8:30 AM 7-Feb-2018 A Approved Closed

Exterior terracotta cladding installation for physical mock up Cluster


0142 KHEP-AR-0142
69 between column bay A-B & D-E front elevation Zone 4B
Cluster 69 Zone 4B Division 9 5-Feb-2018 6-Feb-2018 10:00 AM 7-Feb-2018 E Rejected Closed

Exterior terracotta cladding installation for physical mock up Cluster


0143 KHEP-AR-0143
69 between column bay B-C & C-D front elevation Zone 4B
Cluster 69 Zone 4B Division 9 5-Feb-2018 6-Feb-2018 10:30 AM 7-Feb-2018 E Rejected Closed

Approved w/
0144 KHEP-AR-0144 Installation of CMU wall at roof floor Cluster 75 B2 unit A-B Zone 1B Cluster 75 B2 Zone 1B Division 4 7-Feb-2018 8-Feb-2018 8:30 AM 10-Feb-2018 B comments
Closed

Concrete screed pouring Cluster 5 B2 unit A-B first floor Excluding


0145 KHEP-AR-0145
wet areas & balconies Zone 1B
Cluster 05 B2 Zone 1B Division 4 7-Feb-2018 8-Feb-2018 8:00 AM 11-Feb-2018 A Approved Closed

Installation of concrete screed elevation guides @ ground floor unit B


0146 KHEP-AR-0146
Zone 1B Cluster 15
Cluster 15 Zone 1B Division 3 11-Feb-2018 12-Feb-2018 8:30 AM 13-Feb-2018 A Approved Closed

Application of 2nd coating for interior walls Cluster 69 first floor unit Approved w/
0147 KHEP-AR-0147
B Zone 4B
Cluster 69 Zone 4B Division 9 13-Feb-2018 14-Feb-2018 8:00 AM 14-Feb-2018 B comments
Closed

Application of 2nd coating for interior walls Cluster 69 ground floor Approved w/
0148 KHEP-AR-0148
unit B Zone 4B
Cluster 69 Zone 4B Division 9 13-Feb-2018 14-Feb-2018 8:30 AM 14-Feb-2018 B comments
Closed

Application of textured paint for external wall Cluster 69 ground floor


0149 KHEP-AR-0149
unit B Zone 4B
Cluster 69 Zone 4B Division 9 13-Feb-2018 14-Feb-2018 8:45 AM 14-Feb-2018 E Rejected Closed

Installation of CMU wall exterior perimeter wall first layer Cluster 68


0150 KHEP-AR-0150 B2 unit A & B first floor Excluding wall area for terracotta cladding Cluster 68 Zone 1B NA 14-Feb-2018 15-Feb-2018 8:30 AM 17-Feb-2018 E Rejected Closed
Zone 1B Cluster 68
Installation of CMU wall exterior perimeter wall first layer Cluster 75
0151 KHEP-AR-0151 B2 unit A & B first floor Excluding wall area for terracotta cladding Cluster 75 Zone 1B NA 14-Feb-2018 15-Feb-2018 9:00 AM 17-Feb-2018 E Rejected Closed
Zone 1B Cluster 75
Installation of CMU wall from 2nd layer to level of lintel beak soffit
0152 KHEP-AR-0152 Cluster 15 B2 unit A & B ground floor Excluding wall areas for Cluster 15 Zone 1B Division 4 14-Feb-2018 15-Feb-2018 9:30 AM 18-Feb-2018 A Approved Closed
terracotta cladding Zone 1B Cluster 15
Application of dash coating including installation of plaster
0153 KHEP-AR-0153 accessories & vertical level guides at Cluster 14 B2 unit A & B first Cluster 14 Zone 1B Division 4 14-Feb-2018 15-Feb-2018 10:00 AM 18-Feb-2018 A Approved Closed
floor interior wall Zone 1B Cluster 14

Installation of external perimeter wall first layer Cluster 48 B2 unit A


0154 KHEP-AR-0154
& B Excluding wall for terracotta cladding Zone 1B Cluster 48
Cluster 48 Zone 1B Division 4 14-Feb-2018 15-Feb-2018 10:30 AM 18-Feb-2018 A Approved Closed

Pouring of concrete screeding at ground floor unit A & B Excluding


0155 KHEP-AR-0155
wet areas kitchen & garage Zone 1B Cluster 15
Cluster 15 Zone 1B Division 3 17-Feb-2018 18-Feb-2018 9:30 AM 19-Feb-2018 A Approved Closed

Installtion of 1st layer CMU perimeter wall at ground floor Cluster 14


0156 KHEP-AR-0156
B2 unit A-B Excluding Terracotta wall area Zone 1B Cluster 14
Cluster 14 Zone 1B Division 4 21-Feb-2018 22-Feb-2018 8:30 AM 26-Feb-2018 A Approved Closed

Installation of CMU walls for terracotta cladding first layer of ground


0157 KHEP-AR-0157
floor Cluster 14 B4 unit A-B Zone 1B Cluster 14
Cluster 14 Zone 1B Division 4 21-Feb-2018 22-Feb-2018 9:00 AM 26-Feb-2018 A Approved Closed

Installation of CMU wall from top of lintel beams to soffit of first floor
0158 KHEP-AR-0158 beams & slab ledge Cluster 15 B2 unit A-B first floor Excluding wall Cluster 15 Zone 1B Division 4 21-Feb-2018 22-Feb-2018 10:00 AM 26-Feb-2018 A Approved Closed
areas for terracotta cladding Zone 1B Cluster 15

Installation of Overhead Coiling door for garage Cluster 69 ground Approved w/


0159 KHEP-AR-0159
floor unit B Zone 4B Cluster 69
Cluster 69 Zone 4B Division 9 21-Feb-2018 22-Feb-2018 10:30 AM 26-Feb-2018 B comments
Closed

Installation of CMU walls for terracotta cladding first layer of first


0160 KHEP-AR-0160
floor Cluster 10 B2 unit A-B Zone 1B Cluster 10
Cluster 10 Zone 1B Division 4 21-Feb-2018 24-Feb-2018 8:30 AM 24-Feb-2018 E Rejected Closed

Installation of external perimeter wall first layer Cluster 20 B2 A-B


0161 KHEP-AR-0161
first floor Excluding wall for terracotta cladding Zone 1B Cluster 20
Cluster 20 Zone 1B Division 4 21-Feb-2018 24-Feb-2018 9:00 AM 24-Feb-2018 E Rejected Closed

Installation of external perimeter wall first layer Cluster 27 B2 A-B


0162 KHEP-AR-0162
first floor Excluding wall for terracotta cladding Zone 1B Cluster 27
Cluster 27 Zone 1B Division 4 21-Feb-2018 24-Feb-2018 9:30 AM 26-Feb-2018 A Approved Closed

Installation of level guides for concrete screeding Cluster 19 B2 unit


0163 KHEP-AR-0163
A-B first floor excluding wet areas & balconies Zone 1B Cluster 19
Cluster 19 B2 Zone 1B Division 4 25-Feb-2018 26-Feb-2018 10:00 AM 27-Feb-2018 E Rejected Closed

Installation of level guides for concrete screeding Cluster 17 B2 unit


0164 KHEP-AR-0164
A-B first floor excluding wet areas & balconies Zone 1B Cluster 17 B2
Cluster 17 B2 Zone 1B Division 4 25-Feb-2018 26-Feb-2018 10:30 AM 27-Feb-2018 E Rejected Closed

Lintel beam installation for external walls Cluster 15 B2 unit A & B


0165 KHEP-AR-0165 Cluster 15 B2 Zone 1B Division 3 26-Feb-2018 27-Feb-2018 8:30 AM Open
ground floor Zone 1B
CMU laying from 2nd layer to level of lintel beam soffit Cluster 14 B2
0166 KHEP-AR-0166 Cluster 14 B2 Zone 1B Division 4 26-Feb-2018 27-Feb-2018 8:30 AM Open
unit A & B ground floor Zone 1B
Concrete screed pouring Cluster 17 B2 unit A & B first floor excluding
0167 KHEP-AR-0167 Cluster 17 B2 Zone 1B Division 3 26-Feb-2018 27-Feb-2018 9:00 AM Open
wet areas & balconies Zone 1B

0168 KHEP-AR-0168 Installation of CMU wall at roof floor Cluster 01 A6 Zone 4B Cluster 01 A6 Zone 4B Division 4 26-Feb-2018 27-Feb-2018 9:30 AM 28-Feb-2018 A Approved Closed

CIVIL
Surface Preparation Prior to Backfilling in Temporary Facility Area Approved w/
001 KHEP-CI-0001
Mobilization
Mobilization Zone 5D Division 31 28-Jan-2017 29-Jan-2017 B comments
Closed

1st Layer Compaction Test Inspection


002 KHEP-CI-0002
Zone 5D
NA Zone 5D Division31 28-Jan-2017 30-Jan-2017 A Approved Closed

Plate Load Bearing Test


003 KHEP-CI-0003
Culster 1 & Culster 2
Culster 01, 02 NA Division 31 28-Jan-2017 3-Feb-2017 A Approved Closed

2ND Layer Compaction Test Inspection


004 KHEP-CI-0004
Mobilization
Mobilization Zone 5D Division 31 29-Jan-2017 2-Feb-2017 A Approved Closed

3rd layer compaction test Inspection


005 KHEP-CI-0005
Mobilization
Mobilization Zone 5D Division 31 30-Jan-2017 1-Feb-2017 E Rejected Closed

005.1 KHEP-CI-0005-01 3rd layer compaction test Inspection NA NA 4-Feb-2017 3-Feb-2017 A Approved Closed
006 KHEP-CI-0006 Surface preparation for excavated grade prior to backfilling NA NA 30-Jan-2017 4-Feb-2017 Cancelled Closed
Revise &
KHEP-CI-0007
007 Review test reports for general and select fill materials NA NA 30-Jan-2017 31-Jan-2017 Resubmit as Closed
(to CT-CI-0002-00)
submittal
Approved w/
008 KHEP-CI-0008 Compaction test inspection prior to blinding concrete NA NA 31-Jan-2017 5-Feb-2017 B comments
Closed

Approved w/
009 KHEP-CI-0009 Blinding concrete sampling, testing and placement inspection NA NA 31-Jan-2017 5-Feb-2017 B comments
Closed

010 KHEP-CI-0010 Termite control applications inspection NA NA 31-Jan-2017 5-Feb-2017 A Approved Closed
Approved w/
011 KHEP-CI-0011 Fill placement and compaction test inspection NA NA 31-Jan-2017 5-Feb-2017 B comments
Closed

012 KHEP-CI-0012 Termite control applications inspection NA NA 1-Feb-2017 5-Feb-2017 E Rejected Closed
012.1 KHEP-CI-0012-01 Termite control applications inspection NA NA 11-Feb-2017 12-Feb-2017 A Approved Closed
013 KHEP-CI-0013 Blinding concrete sampling and testing for foundations NA NA 1-Feb-2017 5-Feb-2017 E Rejected Closed
Approved w/
013.1 KHEP-CI-0013-01 Blinding concrete sampling and testing for foundations NA NA 11-Feb-2017 12-Feb-2017 B comments
Closed

014 KHEP-CI-0014 Clearing, grabbing and leveling prior to upcoming activities NA NA 1-Feb-2017 6-Feb-2017 E Rejected Closed
Approved w/
015 KHEP-CI-0015 Soil Sampling Inspection NA NA 4-Feb-2017 6-Feb-2017 B comments
Closed

016 KHEP-CI-0016 Compaction Test Inspection for final layer of temporary facility roads NA NA 5-Feb-2017 9-Feb-2017 A Approved Closed

017 KHEP-CI-0017 Grading and cutting inspection NA NA 5-Feb-2017 8-Feb-2017 A Approved Closed
018 KHEP-CI-0018 Compaction test inspection prior to backfilling NA NA 6-Feb-2017 9-Feb-2017 Cancelled Closed
019 KHEP-CI-0019 Clearing and grabbing prior to cutting and filling NA NA 7-Feb-2017 9-Feb-2017 Cancelled Closed
Approved w/
020 KHEP-CI-0020 Soil sampling for testing NA NA 7-Feb-2017 9-Feb-2017 B comments
Closed

021 KHEP-CI-0021 Formation level of grading for area as per attached drawing Cluster 03 Zone 1A 8-Feb-2017 14-Feb-2017 A Approved Closed
022 KHEP-CI-0022 Formation level of grading for area as per attached drawing Cluster 04 Zone 1A 8-Feb-2017 14-Feb-2017 A Approved Closed
023 KHEP-CI-0023 Formation level of grading for area as per attached drawing Cluster 05 Zone 2A 8-Feb-2017 14-Feb-2017 A Approved Closed
024 KHEP-CI-0024 Formation level of grading for area as per attached drawing Cluster 06 Zone 2A 8-Feb-2017 14-Feb-2017 A Approved Closed
025 KHEP-CI-0025 Formation level of grading for area as per attached drawing Cluster 07 Zone 3A 8-Feb-2017 14-Feb-2017 A Approved Closed
026 KHEP-CI-0026 Formation level of grading for area as per attached drawing Cluster 08 Zone 3A 8-Feb-2017 14-Feb-2017 A Approved Closed
027 KHEP-CI-0027 Formation level of grading for area as per attached drawing Cluster 11 Zone 4A 8-Feb-2017 14-Feb-2017 A Approved Closed
028 KHEP-CI-0028 Formation level of grading for area as per attached drawing Cluster 12 Zone 4A 8-Feb-2017 14-Feb-2017 A Approved Closed
029 KHEP-CI-0029 Formation level of grading for area as per attached drawing Cluster 01 Zone 1B 8-Feb-2017 14-Feb-2017 Cancelled Closed

030 KHEP-CI-0030 Formation level of grading for area as per attached drawing Cluster 68,69 Zone 4B 8-Feb-2017 14-Feb-2017 Cancelled Closed

031 KHEP-CI-0031 Formation level of grading for area as per attached drawing Cluster 02 Zone 1B 8-Feb-2017 14-Feb-2017 Cancelled Closed
Approved w/
032 KHEP-CI-0032 Compaction test for General fill, 1st layer backfilling Cluster 03 Zone 1A 9-Feb-2017 14-Feb-2017 B comments
Closed

Approved w/
033 KHEP-CI-0033 Compaction test for General fill, 1st layer backfilling Cluster 04 Zone 1A 9-Feb-2017 14-Feb-2017 B comments
Closed

Approved w/
034 KHEP-CI-0034 Compaction test for General fill, 1st layer backfilling Cluster 11 Zone 4A 9-Feb-2017 14-Feb-2017 B comments
Closed

035 KHEP-CI-0035 Compaction test for General fill, 1st layer backfilling Cluster 12 Zone 4A 9-Feb-2017 14-Feb-2017 A Approved Closed
Surface preparation and compaction inspection prior to structural fill Approved w/
036 KHEP-CI-0036
activity
Cluster 69 Zone 4B 11-Feb-2017 14-Feb-2017 B comments
Closed

Compaction test for 1st and final layer of selected fill prior to blinding
037 KHEP-CI-0037
concrete
Cluster 69 Zone 4B 11-Feb-2017 13-Feb-2017 E Rejected Closed

Compaction test for 1st and final layer of selected fill prior to blinding
037.1 KHEP-CI-0037-01
concrete
Cluster 69 Zone 4B 14-Feb-2017 14-Feb-2017 A Approved Closed

038 KHEP-CI-0038 Compaction test for 1st layer of General fill prior Cluster 05 Zone 2A 13-Feb-2017 14-Feb-2017 A Approved Closed
Inspection for Vertical & Horizontal alignment Structural Fill 1st &
039 KHEP-CI-0039
Final Layer
Cluster 69 Zone 4B 14-Feb-2017 15-Feb-2017 E Rejected Closed

Should
Epoxy coated steel bars receiving inspection for 10mm, 12mm,
040 KHEP-CI-0040
16mm & 20mm
NA NA 13-Feb-2017 14-Feb-2017 E Submitted as Closed
MRI format
041 KHEP-CI-0041 Termite control applications Cluster 69 Zone 4B 13-Feb-2017 14-Feb-2017 A Approved Closed
042 KHEP-CI-0042 Blinding Concrete sampling, testing and placement inspection Cluster 69 Zone 4B 13-Feb-2017 15-Feb-2017 A Approved Closed
043 KHEP-CI-0043 Compaction test for 2nd layer backfiling of general fill Cluster 03 Zone 1A 14-Feb-2017 16-Feb-2017 E Rejected Closed
043.1 KHEP-CI-0043-01 Compaction test for 2nd layer backfiling of general fill Cluster 03 Zone 1A 19-Feb-2017 20-Feb-2017 A Approved Closed
044 KHEP-CI-0044 Compaction test for 2nd layer general fill prior to 3rd layer Cluster 04 Zone 1A 14-Feb-2017 16-Feb-2017 E Rejected Closed
044.1 KHEP-CI-0044-01 Compaction test for 2nd layer general fill prior to 3rd layer Cluster 04 Zone 1A 19-Feb-2017 20-Feb-2017 A Approved Closed
045 KHEP-CI-0045 Compaction test for 2nd layer general fill prior to 3rd layer Cluster 05 Zone 2A 14-Feb-2017 16-Feb-2017 E Rejected Closed
045.1 KHEP-CI-0045-01 Compaction test for 2nd layer general fill prior to 3rd layer Cluster 05 Zone 2A 19-Feb-2017 20-Feb-2017 A Approved Closed
Approved w/
046 KHEP-CI-0046 Compaction test for 2nd layer general fill prior to 3rd layer Cluster 11 Zone 4A 14-Feb-2017 18-Feb-2017 B comments
Closed

Approved w/
047 KHEP-CI-0047 Compaction test for 2nd layer general fill prior to 3rd layer Cluster 12 Zone 4A 14-Feb-2017 18-Feb-2017 B comments
Closed

048 KHEP-CI-0048 Review of Material Sampling Test Report (General Fill) NA NA 14-Feb-2017 14-Feb-2017 A Approved Closed
Approved w/
049 KHEP-CI-0049 Soil sampling for testing NA NA 14-Feb-2017 16-Feb-2017 B comments
Closed

049.1 KHEP-CI-0049-01 Review of Soil sampling for testing NA NA 21-Feb-2017 23-Feb-2017 A Approved Closed
50 KHEP-CI-0050 Soil Testing & Review of Test Report NA NA 14-Feb-2017 16-Feb-2017 A Approved Closed
Approved w/
51 KHEP-CI-0051 Compaction Test-1st layer of General fill Cluster 06 Zone 2A 15-Feb-2017 19-Feb-2017 B comments
Closed

Approved w/
52 KHEP-CI-0052 Compaction Test-1st layer of General Fill Cluster 07 Zone 3A 15-Feb-2017 19-Feb-2017 B comments
Closed

53 KHEP-CI-0053 Compaction Test - Formation level of grading for Area Cluster 01 Zone 1A 16-Feb-2017 18-Feb-2017 E Rejected Closed
053.1 KHEP-CI-0053-01 Compaction Test - Formation level of grading for Area Cluster 01 Zone 1A 20-Feb-2017 22-Feb-2017 A Approved Closed

054 KHEP-CI-0054 Compaction Test - Formation level of grading for Area (Cut Area) Cluster 09 Zone 4A 16-Feb-2017 19-Feb-2017 Cancelled Closed

055 KHEP-CI-0055 Compaction Test - Formation level of grading for Area (Cut Area) Cluster 10 Zone 4A 16-Feb-2017 19-Feb-2017 Cancelled Closed

056 KHEP-CI-0056 Compaction Test of 1st Layer Backfill - General Fill Materials NA NA 16-Feb-2017 19-Feb-2017 E Rejected Closed
056.1 KHEP-CI-0056-01 Compaction Test of 1st Layer Backfill - General Fill Materials NA NA 21-Feb-2017 22-Feb-2017 A Approved Closed
057 KHEP-CI-0057 Compaction Test of 2nd Layer Backfill - General Fill Materials NA NA 21-Feb-2017 23-Feb-2017 A Approved Closed
058 KHEP-CI-0058 Compaction Test of 2nd Layer Backfill - General Fill Materials NA NA 21-Feb-2017 23-Feb-2017 A Approved Closed
Approved w/
059 KHEP-CI-0059 Soil sampling for testing of Selected Fill Materials NA NA 21-Feb-2017 23-Feb-2017 B comments
Closed

Approved w/
060 KHEP-CI-0060 Formation Level and Clearing Before Start Backfilling NA NA 21-Feb-2017 26-Feb-2017 B comments
Closed

061 KHEP-CI-0061 Formation Level Mobilization Satellite Office No. 02 NA NA 21-Feb-2017 23-Feb-2017 A Approved Closed
062 KHEP-CI-0062 Cast in place concrete formwork inspection (MOCKUP) NA NA 21-Feb-2017 23-Feb-2017 A Approved Closed
063 KHEP-CI-0063 Compaction test of the third layer general fill Cluster 04 Zone 1A 22-Feb-2017 26-Feb-2017 A Approved Closed
064 KHEP-CI-0064 Compaction test of the third layer general fill Cluster 05 Zone 3A 22-Feb-2017 26-Feb-2017 A Approved Closed
Formation level and Surface Preparation prior to backfilling of
065 KHEP-CI-0065
200mm thk Structural fill- ( Selected Fill Materials)
Cluster 03 Zone 1A 22-Feb-2017 26-Feb-2017 A Approved Closed

066 KHEP-CI-0066 Compaction test first layer general fill Cluster 01 Zone 1A 23-Feb-2017 27-Feb-2017 E Rejected Closed
066.1 KHEP-CI-0066-01 Compaction test first layer general fill Cluster 01 Zone 1A 27-Feb-2017 1-Mar-2017 A Approved Closed
067 KHEP-CI-0067 Compaction test second layer general fill Cluster 08 Zone 3A 23-Feb-2017 27-Feb-2017 A Approved Closed
068 KHEP-CI-0068 Formation level of grading and compaction test Cluster 02 Zone 1A 27-Feb-2017 1-Mar-2017 E Rejected Closed
Approved w/
069 KHEP-CI-0069 Compaction test first & final layer structural fill Cluster 03 Zone 1A 27-Feb-2017 28-Feb-2017 B comments
Closed

070 KHEP-CI-0070 Inspection of Compaction test Cluster 05 Zone 2A 27-Feb-2017 1-Mar-2017 A Approved Closed
Approved w/
071 KHEP-CI-0071 Inspection of Compaction test Cluster 04 Zone 1A 27-Feb-2017 28-Feb-2017 B comments
Closed

Installation of reinforced steel bar, embedded item & from closure


072 KHEP-CI-0072
inspection for (MOCKUP)
NA NA 27-Feb-2017 28-Feb-2017 A Approved Closed

073 KHEP-CI-0073 Inspection compaction test third layer general fill Cluster 06 Zone 2A 27-Feb-2017 1-Mar-2017 E Rejected Closed
073.1 KHEP-CI-0073-01 Inspection compaction test third layer general fill Cluster 06 Zone 2A 1-Mar-2017 4-Mar-2017 A Approved Closed
074 KHEP-CI-0074 Inspection compaction test third layer general fill Cluster 07 Zone 3A 27-Feb-2017 1-Mar-2017 E Rejected Closed
074.1 KHEP-CI-0074-01 Inspection compaction test third layer general fill Cluster 07 Zone 3A 1-Mar-2017 4-Mar-2017 A Approved Closed
CBR-California bearing ratio test (Excavated Soil Material On Site
075 KHEP-CI-0075 NA NA 27-Feb-2017 1-Mar-2017 Cancelled Closed
General Fill)
076 KHEP-CI-0076 Cast in place concrete formwork inspection NA NA 27-Feb-2017 28-Feb-2017 E Rejected Closed
077.1 KHEP-CI-0076-01 Cast in place concrete formwork inspection NA NA 1-Mar-2017 2-Mar-2017 A Approved Closed
Concrete Sampling,Testing and Placement Inspection for RC Footing
077 KHEP-CI-0077
(Mockup)
Cluster 69 Zone 4B 27-Feb-2017 2-Mar-2017 A Approved Closed

Inspection: Compaction test first layer genral fill ( Road 04 STA Approved w/
078 KHEP-CI-0078
0+025 to 0+100) (Zone-5A)
Road 04 Zone 5A 27-Feb-2017 1-Mar-2017 B comments
Closed

Cast in place concrete formwork inspection for neckcolumn


079 KHEP-CI-0079
(MOCKUP)
Cluster 69 Zone 4B 28-Feb-2017 4-Mar-2017 E Rejected Closed

Cast in place concrete formwork inspection for neckcolumn


080 KHEP-CI-0079-01
(MOCKUP)
Cluster 69 Zone 4B 4-Mar-2017 6-Mar-2017 A Approved Closed

Installation of reinforced steel bar, embedded item & form closure


080 KHEP-CI-0080
inspection for neckcolumn (MOCKUP)
Cluster 69 Zone 4B 28-Feb-2017 4-Mar-2017 E Rejected Closed

Installation of reinforced steel bar, embedded item & form closure


080 KHEP-CI-0080-01
inspection for neckcolumn (MOCKUP)
Cluster 69 Zone 4B 4-Mar-2017 6-Mar-2017 A Approved Closed

Concrete Sampling,Testing and Placement Inspection of neckcolumn


081 KHEP-CI-0081
(Mockup)
Cluster 69 Zone 4B 28-Feb-2017 2-Mar-2017 E Rejected Closed

Concrete Sampling,Testing and Placement Inspection of neckcolumn


081 KHEP-CI-0081-01
(Mockup)
Cluster 69 Zone 4B 4-Mar-2017 8-Mar-2017 A Approved Closed

Installation of reinforcment steel bar ,embedded item & form closure Approved w/
082 KHEP-CI-0082
inspection for R.C Foundation
Cluster 01 A6 NA 28-Feb-2017 2-Mar-2017 B comments
Closed

083 KHEP-CI-0083 Concrete sampling,testing & placement inspection for R.C Foundation Cluster 01 A6 NA 28-Feb-2017 5-Mar-2017 A Approved Closed

Concrete BLINDING Sampling,Testing and Placement Inspection for


084 KHEP-CI-0084
PC Footing
NA NA 28-Feb-2017 2-Mar-2017 A Approved Closed

Inspection: Compaction test formation level & surface preparation


prior to fill placement structural fill (Selected fill materials 200mm
085 KHEP-CI-0085
thickness) (Zone-1A / C-04) to Excavated grade Formation checking
Cluster 04 Zone 1A 28-Feb-2017 2-Mar-2017 A Approved Closed
for cluster
086 KHEP-CI-0086 Soil Testing & Review Test Report NA NA 28-Feb-2017 1-Mar-2017 A Approved Closed
Compaction Test - General fill second layer Road 04- STA, 0+025 /
087 KHEP-CI-0087
0+100
NA NA 28-Feb-2017 4-Mar-2017 A Approved Closed

088 KHEP-CI-0088 Compaction test - third layer general fill (Zone-1A / C-03) Cluster 03 Zone 1A 1-Mar-2017 4-Mar-2017 A Approved Closed
089 KHEP-CI-0089 Excavated grade Formation checking for cluster NA NA 1-Mar-2017 5-Mar-2017 A Approved Closed
Termite control surface prepareation, istallation & final inspection for
090 KHEP-CI-0090
PC foundation
NA NA 2-Mar-2017 5-Mar-2017 A Approved Closed

Compaction test structural fill first & final layer (Selected fill mm
091 KHEP-CI-0091
thikness)
NA NA 2-Mar-2017 6-Mar-2017 A Approved Closed

092 KHEP-CI-0092 Compaction test Second layer general fill ( Zone-1A- 01) Cluster 01 Zone 1A 2-Mar-2017 5-Mar-2017 A Approved Closed
093 KHEP-CI-0093 Compaction test third layer general fill NA NA 2-Mar-2017 5-Mar-2017 E Rejected Closed
093.1 KHEP-CI-0093-01 Compaction test third layer general fill STA 0+025 0+100 Road 04 Zone 5A 6-Mar-2017 7-Mar-2017 10:00 AM 9-Mar-2017 A Approved Closed

094 KHEP-CI-0094 Inspection Compaction test 5th layer general fill ( Zone-2A- C-05, ) Cluster 05 Zone 1A 4-Mar-2017 6-Mar-2017 A Approved Closed

095 KHEP-CI-0095 Inspection Compaction test 5th layer general fill ( Zone-1A- C-04, ) Cluster 04 Zone 1A 4-Mar-2017 6-Mar-2017 A Approved Closed

Installation of reinforcing steel bar, embedded item & form closure


096 KHEP-CI-0096
inspection for neckcolumn Axis (A,B,C,L,M,N)
Cluster 01 A6 NA 5-Mar-2017 6-Mar-2017 10:30 AM 8-Mar-2017 A Approved Closed

097 KHEP-CI-0097 Inspection Compaction test - 4th layer general fill Cluster 06 Zone 2A 5-Mar-2017 6-Mar-2017 1:00 PM 8-Mar-2017 A Approved Closed
098 KHEP-CI-0098 Inspection Compaction test - 4th layer general fill Cluster 07 Zone 3A 5-Mar-2017 6-Mar-2017 1:00 PM 8-Mar-2017 A Approved Closed
099 KHEP-CI-0099 Inspection Compaction test - 3rd layer general fill Cluster 08 Zone 3A 5-Mar-2017 6-Mar-2017 1:00 PM 7-Mar-2017 A Approved Closed
Inspection Compaction test - 1st & final layer structural fill (Selected
100 KHEP-CI-0100
Fill 200mm Thickness)
Cluster 81 A6 Zone 4A 5-Mar-2017 6-Mar-2017 1:00 PM 7-Mar-2017 E Rejected Closed

Inspection Compaction Test 1st & final layer structural fill (Selected
101 KHEP-CI-0100-01
Fill 200mm Thickness)
Cluster 81 A6 Zone 4A 7-Mar-2017 8-Mar-2017 1:00 PM 9-Mar-2017 A Approved Closed

Inspection - Soil sampling and testing for existing material under


101 KHEP-CI-0101
foundation (Sandy Soil)
Cluster 68 B2 Zone 4B 5-Mar-2017 6-Mar-2017 1:00 PM 11-Mar-2017 A Approved Closed

102 KHEP-CI-0102 Inspection test third layer general fill Cluster 01 Zone 1A 6-Mar-2017 7-Mar-2017 1:30 PM 9-Mar-2017 A Approved Closed
Inspection Compaction Test Excavated grade formation checking for Cluster 43 &
103 KHEP-CI-0103
cluster 05 A6
Zone 2A 6-Mar-2017 7-Mar-2017 1:30 PM 11-Mar-2017 A Approved Closed

Installation of reinforcing steel bar, embedded item & form closure Approved w/
104 KHEP-CI-0104
inspection for RC Foundation Axis (D,E,F,G,H,J,K)
Cluster 01 A6 NA 6-Mar-2017 7-Mar-2017 1:30 PM 8-Mar-2017 B comments
Closed

Approved w/
105 KHEP-CI-0105 Cast in place concrete formwork inspection Axis (D,E,F,G,H,J,K) Cluster 01 A6 NA 6-Mar-2017 7-Mar-2017 1:30 PM 8-Mar-2017 B comments
Closed

Concrete Sampling, Testing & Placement Inspection Axis


106 KHEP-CI-0106
(D,E,F,G,H,J,K)
Cluster 01 A6 NA 6-Mar-2017 7-Mar-2017 2:30 PM 11-Mar-2017 E Rejected Closed

Concrete Sampling, Testing & Placement Inspection Axis


106.1 KHEP-CI-0106-01
(D,E,F,G,H,J,K)
Cluster 01 A6 NA 8-May-2017 9-May-2017 9:30 AM 10-May-2017 A Approved Closed

107 KHEP-CI-0107 Ispection of compaction test 6th layer general fill Cluster 04 Zone 1A 7-Mar-2017 8-Mar-2017 2:30 PM 11-Mar-2017 A Approved Closed
108 KHEP-CI-0108 Ispection of compaction test 6th layer general fill Cluster 05 Zone 2A 7-Mar-2017 8-Mar-2017 2:30 PM 11-Mar-2017 A Approved Closed
Concrete sampling, Testing & Placement Inspection for RC
109 KHEP-CI-0109
Foundation Axis (A,B,C,L,M,N)
Cluster 02 A6 NA 7-Mar-2017 8-Mar-2017 2:30 PM 12-Mar-2017 A Approved Closed

110 KHEP-CI-0110 Cast in place concrete formwordk inspection Axis (A,B,C,L,M,N) Cluster 02 A6 NA 7-Mar-2017 8-Mar-2017 1:30 PM 11-Mar-2017 A Approved Closed

Installation of reinforcing steel bar, embedded item & form closure


111 KHEP-CI-0111
inspection for RC Foundation Axis (A,B,C,L,M,N)
Cluster 02 A6 NA 7-Mar-2017 8-Mar-2017 1:30 PM 11-Mar-2017 A Approved Closed

Blinding concrete sampling,testing & placement inspection for PC


112 KHEP-CI-0112
Foundation
Cluster 04 A6 NA 7-Mar-2017 8-Mar-2017 2:00 PM 11-Mar-2017 E Rejected Closed

Blinding concrete sampling, testing & placement inspection for PC


112.1 KHEP-CI-0112-01
Foundation
Cluster 04 A6 NA 8-May-2017 9-May-2017 9:00 AM 10-May-2017 A Approved Closed

113 KHEP-CI-0113 Formation level around the retention basin no# 02 Basin 02 Zone-5A 7-Mar-2017 8-Mar-2017 2:00 PM 11-Mar-2017 A Approved Closed
Stock file No. Approved w/
114 KHEP-CI-0114 Soil sampling for testing selected fill materials
04
NA 7-Mar-2017 8-Mar-2017 2:00 PM 9-Mar-2017 B comments
Closed

Stock file No.


114.1 KHEP-CI-0114-01 Soil sampling for testing selected fill materials
04
NA 22-Mar-2017 23-Mar-2017 9:30 AM 23-Mar-2017 A Approved Closed

Termite control surface prepareation, istallation & final inspection for


115 KHEP-CI-0115
PC foundation
Cluster 04 A6 NA 7-Mar-2017 8-Mar-2017 10:00 AM 9-Mar-2017 A Approved Closed

Concrete sampling, Testing & Placement Inspection for RC


116 KHEP-CI-0116
Foundation
Cluster 01 A6 NA 8-Mar-2017 9-Mar-2017 2:30 PM 12-Mar-2017 E Rejected Closed

Concrete sampling, Testing & Placement Inspection for RC


117 KHEP-CI-0116-01
Foundation (1) Axis (B,D,F,H,K,M)
Cluster 01 A6 NA 15-Mar-2017 16-Mar-2017 8:00 AM 19-Mar-2017 A Approved Closed

117 KHEP-CI-0117 Cast in place concrete formwork inspection (1) Axis (B,D,F,H,K,M) Cluster 01 A6 NA 8-Mar-2017 9-Mar-2017 10:30 AM 11-Mar-2017 A Approved Closed

Installation of reinforcing steel bar, embedded item & form closure


118 KHEP-CI-0118
inspection for RC Foundation (1) Axis (B,D,F,H,K,M)
Cluster 01 A6 NA 8-Mar-2017 9-Mar-2017 10:30 AM 11-Mar-2017 E Rejected Closed

Installation of reinforcing steel bar, embedded item & form closure


119 KHEP-CI-0118-01
inspection for RC Foundation Axis (1) Axis (B,D,F,H,K,M)
Cluster 01 A6 NA 15-Mar-2017 16-Mar-2017 8:00 AM 16-Mar-2017 A Rejected Closed

Damproofing surface preparation for RC foundation & column neck


119 KHEP-CI-0119
inspection for (Mockup)
Cluster 69 Zone 4B 8-Mar-2017 9-Mar-2017 10:30 AM 12-Mar-2017 A Approved Closed

120 KHEP-CI-0120 Compaction test 5th layer general fill Cluster 06 Zone 2A 8-Mar-2017 9-Mar-2017 2:00 PM 11-Mar-2017 A Approved Closed
121 KHEP-CI-0121 Compaction test 5th layer general fill Cluster 07 Zone 3A 8-Mar-2017 9-Mar-2017 2:00 PM 11-Mar-2017 A Approved Closed
122 KHEP-CI-0122 Compaction test excavated grade formation checking for cluster Cluster 68 Zone 4B 8-Mar-2017 9-Mar-2017 2:00 PM 11-Mar-2017 A Approved Closed

Compaction test first & final layer structural fill ( 200mm thikness Cluster 05,43
123 KHEP-CI-0123
Selected fill) A6
Zone 2A 9-Mar-2017 11-Mar-2017 2:00 PM 12-Mar-2017 A Approved Closed

Concrete sampling,testing & placement inspection Axis


124 KHEP-CI-0124
(D,E,F,G,H,J,K)
Cluster 02 A6 NA 9-Mar-2017 11-Mar-2017 1:30 PM 13-Mar-2017 A Approved Closed

Approved w/
125 KHEP-CI-0125 Cast in place concrete formwork inspection Axis (D,E,F,G,H,J,K) Cluster 02 A6 NA 9-Mar-2017 11-Mar-2017 10:30 AM 12-Mar-2017 B comments
Closed

Installation of reinforcing steel bar, embedded item & form closure Approved w/
126 KHEP-CI-0126
inspection for RC Foundation Axis (D,E,F,G,H,J,K)
Cluster 02 A6 NA 9-Mar-2017 11-Mar-2017 11:00 AM 12-Mar-2017 B comments
Closed

Termite control surface prepareation, istallation & final inspection for


127 KHEP-CI-0127
PC foundation
Cluster 81 NA 9-Mar-2017 11-Mar-2017 10:00 AM 12-Mar-2017 A Approved Closed

Blinding concrete sampling, testing & placement inspection for PC


128 KHEP-CI-0128
Foundation
Cluster 81 NA 9-Mar-2017 11-Mar-2017 1:30 PM 13-Mar-2017 A Approved Closed

129 KHEP-CI-0129 Compaction test 1st layer general fill Basin 02 Zone 5 9-Mar-2017 11-Mar-2017 2:00 PM 13-Mar-2017 A Approved Closed
Compaction test 4th layer general fill (Road no. 04 STA, 0+025-
130 KHEP-CI-0130
0+100)
Road 04 Zone 5A 9-Mar-2017 11-Mar-2017 2:00 PM 12-Mar-2017 A Approved Closed

131 KHEP-CI-0131 Compaction test 4th layer general fill Cluster 01 Zone 1A 9-Mar-2017 11-Mar-2017 2:00 PM 12-Mar-2017 E Rejected Closed
132 KHEP-CI-0131-01 Compaction test 4th layer general fill Cluster 01 Zone 1A 12-Mar-2017 13-Mar-2017 1:30 PM 14-Mar-2017 A Approved Closed
132 KHEP-CI-0132 Compaction test 7th layer general fill Cluster 04 Zone 1A 9-Mar-2017 11-Mar-2017 2:00 PM 12-Mar-2017 A Approved Closed
133 KHEP-CI-0133 Compaction test 7th layer general fill Cluster 05 Zone 2A 9-Mar-2017 11-Mar-2017 2:00 PM 12-Mar-2017 A Approved Closed
134 KHEP-CI-0134 Compaction test 6th layer general fill Cluster 06 Zone 2A 11-Mar-2017 12-Mar-2017 2:30 PM 14-Mar-2017 A Approved Closed
135 KHEP-CI-0135 Compaction test 6th layer general fill Cluster 07 Zone 3A 11-Mar-2017 12-Mar-2017 2:30 PM 14-Mar-2017 A Approved Closed
Cluster 06,44
136 KHEP-CI-0136 Compaction test Formation level
A6
Zone 2A 11-Mar-2017 12-Mar-2017 2:30 PM 14-Mar-2017 A Approved Closed

Cluster 07,45
137 KHEP-CI-0137 Compaction test Formation level Zone 3A 11-Mar-2017 12-Mar-2017 2:30 PM Cancelled Cancelled Cancelled
A6

138 KHEP-CI-0138 Compaction test structural (Selected fill) under foundation Cluster 68 B2 Zone 4B 11-Mar-2017 12-Mar-2017 2:30 PM 13-Mar-2017 E Rejected Closed

139 KHEP-CI-0138-01 Compaction test structural (Selected fill) under foundation Cluster 68 B2 Zone 4B 13-Mar-2017 14-Mar-2017 1:30 PM 15-Mar-2017 A Approved Closed

139 KHEP-CI-0139 Compaction test Formation level Cluster 17 B2 Zone 1B 11-Mar-2017 12-Mar-2017 2:30 PM 13-Mar-2017 E Rejected Closed

140 KHEP-CI-0139-01 Compaction test Formation level Cluster 17 B2 Zone 1B 13-Mar-2017 14-Mar-2017 1:30 PM 15-Mar-2017 A Approved Closed

140 KHEP-CI-0140 Compaction test 8th layer general fill Cluster 04 Zone 1A 12-Mar-2017 13-Mar-2017 1:30 PM 14-Mar-2017 A Approved Closed
141 KHEP-CI-0141 Compaction test 8th layer general fill Cluster 05 Zone 2A 12-Mar-2017 13-Mar-2017 1:30 PM 15-Mar-2017 A Approved Closed
First Coat, Damproofing installation inspection and final inspection for
142 KHEP-CI-0142
foundation & neck column (mokup)
Cluster 69 Zone 4B 12-Mar-2017 13-Mar-2017 8:00 AM 14-Mar-2017 A Approved Closed

Cast in place concrete formwork inspection for RC footing axis


143 KHEP-CI-0143
(A,B,C,L,M,N)
Cluster 03 A6 NA 12-Mar-2017 13-Mar-2017 1:30 PM 14-Mar-2017 A Approved Closed

Installation of reinforcing steel bar, embedded item and form clusure


144 KHEP-CI-0144
inspection for RC Foundation axis (A,B,C,L,M,N)
Cluster 03 A6 NA 12-Mar-2017 13-Mar-2017 1:30 PM 14-Mar-2017 A Approved Closed

Concrete sampling, testing and placement inscpection for RC Footing


145 KHEP-CI-0145
axis (A,B,C,L,M,N)
Cluster 03 A6 NA 12-Mar-2017 13-Mar-2017 2:00 PM 16-Mar-2017 E Rejected Closed

Termite control surface preparation, istallation & final inspection for


146 KHEP-CI-0146
PC foundation
Cluster 43 A6 NA 12-Mar-2017 13-Mar-2017 1:30 PM 14-Mar-2017 A Approved Closed

Blinding concrete sampling, testing and placement inspection for PC


147 KHEP-CI-0147
Foundation
Cluster 43 A6 NA 12-Mar-2017 13-Mar-2017 2:30 PM 15-Mar-2017 A Approved Closed

148 KHEP-CI-0148 Soil testing & review test report As per Highlighted drwg. NA NA 12-Mar-2017 13-Mar-2017 1:30 PM 14-Mar-2017 A Approved Closed
Second Coat, Damproofing installation inspection and final inspection
149 KHEP-CI-0149
for foundation & neck column (mokup)
Cluster 69 Zone 4B 12-Mar-2017 14-Mar-2017 9:00 AM 15-Mar-2017 A Approved Closed

150 KHEP-CI-0150 Compaction test Formation level Cluster 08 Zone 1B 13-Mar-2017 14-Mar-2017 1:30 PM 15-Mar-2017 A Approved Closed
151 KHEP-CI-0151 Compaction test Formation level Cluster 66 Zone 4A 13-Mar-2017 14-Mar-2017 1:30 PM 15-Mar-2017 A Approved Closed
152 KHEP-CI-0152 Compaction test 5th layer general fill STA, 0+025 to 0+100 ) Road 04 Zone 5A 13-Mar-2017 14-Mar-2017 1:30 PM 15-Mar-2017 A Approved Closed
Concrete sampling, testing and placement inscpection for Exterior
153 KHEP-CI-0153
Reinforced Beam Under Block Wall (MOCKUP)
Cluster 69 Zone 4B 13-Mar-2017 14-Mar-2017 9:00 AM 15-Mar-2017 A Approved Closed

Cast in place concrete formwork inspection for Exterior Reinforced


154 KHEP-CI-0154
Beam Under Block Wall (MOCKUP)
Cluster 69 Zone 4B 13-Mar-2017 14-Mar-2017 9:30 AM 15-Mar-2017 A Approved Closed
Installation of reinforcement steel bar, embedded item & form
155 KHEP-CI-0155 closure inspection for Exterior Reinforced Beam Under Block Wall Cluster 69 Zone 4B 13-Mar-2017 14-Mar-2017 10:30 AM 15-Mar-2017 A Approved Closed
(MOCKUP)
Cast in place concrete formwork inspection for RC footing A6 axis
156 KHEP-CI-0156
(D,E,F,G,H,J,K,)
Cluster 03 NA 13-Mar-2017 14-Mar-2017 1:30 PM 15-Mar-2017 A Approved Closed

Installation of reinforcement steel bar, embedded item & form


157 KHEP-CI-0157
closure inspection for RC Foundation A6 axis (D,E,F,G,H,J,K,)
Cluster 03 NA 13-Mar-2017 14-Mar-2017 1:30 PM 15-Mar-2017 A Approved Closed

Concrete sampling, Testing & Placement Inspection for RC Footing


158 KHEP-CI-0158
A6 axis (D,E,F,G,H,J,K,)
Cluster 03 NA 13-Mar-2017 14-Mar-2017 1:30 PM 16-Mar-2017 E Rejected Closed

159 KHEP-CI-0159 Compaction test 1st & final layer structural fill Cluster 17 B2 Zone 1B 15-Mar-2017 16-Mar-2017 1:30 PM 18-Mar-2017 A Approved Closed

Approved w/
160 KHEP-CI-0160 Batching plant inspection & trial mix (Concrete Grade 2000PSI OPC) ABNI NA 14-Mar-2017 15-Mar-2017 11:00 AM 29-Mar-2017 B comments
Closed

Approved w/
161 KHEP-CI-0161 Batching plant inspection & trial mix (Concrete Grade 3000PSI OPC) ABNI NA 14-Mar-2017 15-Mar-2017 11:00 AM 29-Mar-2017 B comments
Closed

Approved w/
162 KHEP-CI-0162 Batching plant inspection & trial mix (Concrete Grade 5000PSI OPC) ABNI NA 14-Mar-2017 15-Mar-2017 11:00 AM 29-Mar-2017 B comments
Closed

Batching plant inspection & trial mix (Concrete Grade 5000PSI OPC Approved w/
163 KHEP-CI-0163
+7% MS)
ABNI NA 14-Mar-2017 15-Mar-2017 11:00 AM 29-Mar-2017 B comments
Closed

164 KHEP-CI-0164 Compaction test 9th layer general fill Cluster 05 Zone 2A 14-Mar-2017 15-Mar-2017 1:30 PM 19-Mar-2017 A Approved Closed
165 KHEP-CI-0165 Compaction test 7th layer general fill Cluster 06 Zone 2A 14-Mar-2017 15-Mar-2017 1:30 PM 19-Mar-2017 A Approved Closed
Site Approved w/
166 KHEP-CI-0166 Sampling for Sand Fill
Excavation
Zone 1B 14-Mar-2017 15-Mar-2017 1:30 PM 18-Mar-2017 B comments
Closed

Site
166.1 KHEP-CI-0166-01 Sampling for Sand Fill & review test report
Excavation
Zone 1B 23-Mar-2017 25-Mar-2017 2:30 PM 26-Mar-2017 E Rejected Closed

Jobsite Stcok Approved w/


166.2 KHEP-CI-0166-02 Sampling for Sand Fill & review test report
file
NA 27-Mar-2017 28-Mar-2017 2:00 PM 29-Mar-2017 B comments
Closed

167 KHEP-CI-0167 Compaction test 2nd layer general fill Along Retention Basin 02 Zone 5A 14-Mar-2017 15-Mar-2017 1:30 PM 19-Mar-2017 A Approved Closed
Concrete sampling, Testing & Placement Inspection for RC Footing
168 KHEP-CI-0168
A6 axis (A,B,C,D,E,F,G)
Cluster 04 A6 NA 15-Mar-2017 16-Mar-2017 10:00 AM 19-Mar-2017 A Approved Closed

Installation of reinforcement steel bar, embedded item & form


169 KHEP-CI-0169
closure inspection for RC Foundation A6 axis (A,B,C,D,E,F,G)
Cluster 04 A6 NA 15-Mar-2017 16-Mar-2017 9:30 AM 18-Mar-2017 A Approved Closed

Cast in place concrete formwork inspection for RC footing axis


170 KHEP-CI-0170
(A,B,C,D,E,F,G)
Cluster 04 A6 NA 15-Mar-2017 16-Mar-2017 9:00 AM 18-Mar-2017 A Approved Closed

Cast in place concrete formwork inspection for RC NECK COLUMN Approved w/


171 KHEP-CI-0171
axis (A,B,C,L,M,N)
Cluster 01 A6 NA 15-Mar-2017 16-Mar-2017 8:30 AM 18-Mar-2017 B comments
Closed

Concrete sampling, Testing & Placement Inspection for RC NECK


172 KHEP-CI-0172
COLUMN axis (A,B,C,L,M,N)
Cluster 01 A6 NA 15-Mar-2017 16-Mar-2017 9:30 AM 20-Mar-2017 E Rejected Closed

Concrete sampling, Testing & Placement Inspection for RC NECK


172.1 KHEP-CI-0172-01
COLUMN A6 axis (A,B,C,L,M,N)
Cluster 01 A6 NA 23-Mar-2017 25-Mar-2017 9:30 AM 25-Mar-2017 A Approved Closed

Concrete sampling, Testing & Placement Inspection for RC


173 KHEP-CI-0173
Foundation (1) - axis (B,D,F,H,K,M)
Cluster 02 A6 NA 15-Mar-2017 16-Mar-2017 9:00 AM 19-Mar-2017 A Approved Closed

Installation of reinforcement steel bar, embedded item & form


174 KHEP-CI-0174
closure inspection for RC Foundation (1) - axis (B,D,F,H,K,M)
Cluster 02 A6 NA 15-Mar-2017 16-Mar-2017 9:30 AM 16-Mar-2017 A Rejected Closed

Cast in place concrete formwork inspection for RC footing (1) - axis


175 KHEP-CI-0175
(B,D,F,H,K,M)
Cluster 02 A6 NA 15-Mar-2017 16-Mar-2017 9:00 AM 16-Mar-2017 A Rejected Closed

Termite control surface preparation,Installation & final inspection for


176 KHEP-CI-0176
PC Foundation
Cluster 68 B2 NA 15-Mar-2017 16-Mar-2017 9:00 AM 18-Mar-2017 A Approved Closed

Blinding concrete sampling, testing & placement inspection for PC


177 KHEP-CI-0177
Foundation
Cluster 68 B2 NA 15-Mar-2017 16-Mar-2017 9:00 AM 19-Mar-2017 A Approved Closed

Installation of reinforcement steel bar, embedded item & form


178 KHEP-CI-0178
closure inspection for RC NECK COLUMN axis (D,E,F,G,H,J,K)
Cluster 01 A6 NA 15-Mar-2017 16-Mar-2017 9:30 AM 18-Mar-2017 A Approved Closed

179 KHEP-CI-0179 Compaction test excavation level for formation prior to structural fill Cluster 15 B2 Zone 1B 15-Mar-2017 16-Mar-2017 1:30 PM 18-Mar-2017 A Approved Closed

180 KHEP-CI-0180 Compaction test excavation level for formation prior to structural fill Cluster 14 B2 Zone 1B 15-Mar-2017 16-Mar-2017 1:30 PM 18-Mar-2017 A Approved Closed

181 KHEP-CI-0181 Compaction test excavation level for formation prior to structural fill Cluster 07 B2 Zone 1B 15-Mar-2017 16-Mar-2017 1:30 PM 18-Mar-2017 A Approved Closed

182 KHEP-CI-0182 Compaction test 5th layer structural fill Cluster 01 Zone 1A 15-Mar-2017 16-Mar-2017 1:30 PM 18-Mar-2017 A Approved Closed

183 KHEP-CI-0183 Compaction test 1st & final layer structural fill Cluster 08 B2 Zone 1B 15-Mar-2017 16-Mar-2017 1:30 PM 18-Mar-2017 A Approved Closed

Installation of reinforcement steel bar, embedded item & form


184 KHEP-CI-0184
closure inspection for RC Foundation axis (H,J,K,L,M,N)
Cluster 04 A6 NA 16-Mar-2017 18-Mar-2017 10:30 AM 18-Mar-2017 E Rejected Closed
Installation of reinforcement steel bar, embedded item & form
184.1 KHEP-CI-0184-01
closure inspection for RC Foundation axis (H,J,K,L,M,N)
Cluster 04 A6 NA 19-Mar-2017 20-Mar-2017 10:30 AM 20-Mar-2017 A Approved Closed

Cast in place concrete formwork inspection for RC footing axis


185 KHEP-CI-0185
(H,J,K,L,M,N)
Cluster 04 A6 NA 16-Mar-2017 18-Mar-2017 10:00 AM 18-Mar-2017 E Rejected Closed

Cast in place concrete formwork inspection for RC footing axis


185.1 KHEP-CI-0185-01
(H,J,K,L,M,N)
Cluster 04 A6 NA 19-Mar-2017 20-Mar-2017 10:00 AM 20-Mar-2017 A Approved Closed

Concrete sampling, Testing & Placement Inspection for RC Footing


186 KHEP-CI-0186
axis (H,J,K,L,M,N)
Cluster 04 A6 NA 16-Mar-2017 18-Mar-2017 1:30 PM 18-Mar-2017 E Rejected Closed

Concrete sampling, Testing & Placement Inspection for RC Footing


186.6 KHEP-CI-0186-01
axis (H,J,K,L,M,N)
Cluster 04 A6 NA 19-Mar-2017 20-Mar-2017 10:30 AM 22-Mar-2017 A Approved Closed

Installation of reinforcement steel bar, embedded item & form


187 KHEP-CI-0187 closure inspection for RC NECK COLUMN axis Cluster 02 A6 NA 18-Mar-2017 19-Mar-2017 10:30 AM 20-Mar-2017 A Approved Closed
(A,B,C,D,E,F,G,H,J,K,L,M,N)
Termit control surface preparation, Installation and final inspection
188 KHEP-CI-0188
for PC foundation
Cluster 17 B2 NA 18-Mar-2017 19-Mar-2017 9:00 AM 19-Mar-2017 A Approved Closed

Blinding concrete sampling, testing & placement inspection for PC


189 KHEP-CI-0189
Foundation
Cluster 17 B2 NA 18-Mar-2017 19-Mar-2017 10:30 AM 19-Mar-2017 A Approved Closed

Soil sampling testing and review of test report selected fill materials
190 KHEP-CI-0190
STA, 0+025 to 0+100 )
Road 04 Zone 5A 19-Mar-2017 20-Mar-2017 10:30 AM 21-Mar-2017 E Rejected Closed

191 KHEP-CI-0191 Compaction test 6th layer general fill As per Highlighted drwg. NA NA 19-Mar-2017 20-Mar-2017 10:30 AM 21-Mar-2017 A Approved Closed
192 KHEP-CI-0192 Compaction test 6th layer general fill Cluster 01 Zone 1A 19-Mar-2017 20-Mar-2017 10:30 AM 21-Mar-2017 A Approved Closed
193 KHEP-CI-0193 Compaction test 1st and final layer structural fill (selected fill) Cluster 07 Zone 1B 19-Mar-2017 20-Mar-2017 10:30 AM 21-Mar-2017 A Approved Closed
194 KHEP-CI-0194 Compaction test 1st and final layer structural fill (selected fill) Cluster 14 Zone 1B 19-Mar-2017 20-Mar-2017 10:30 AM 21-Mar-2017 A Approved Closed
195 KHEP-CI-0195 Compaction test 1st and final layer structural fill (selected fill) Cluster 15 Zone 1B 19-Mar-2017 20-Mar-2017 10:30 AM 21-Mar-2017 A Approved Closed
Concrete sampling, testing and placement inspection for RC Neck
196 KHEP-CI-0196
Column axis (D,E,F,G,H,J,K,)
Cluster 01 A6 NA 19-Mar-2017 20-Mar-2017 1:30 PM 26-Mar-2017 A Approved Closed

Cast in place concrete formwork inspection for RC Neck Column axis


197 KHEP-CI-0197
(D,E,F,G,H,J,K,)
Cluster 01 A6 NA 19-Mar-2017 20-Mar-2017 1:30 PM 22-Mar-2017 A Approved Closed

Installation of reinforcing steel bar, embedded item and form closure


198 KHEP-CI-0198
inspection for RC Foundation axis (A,B,C,D,E,F,G,H,J,K,L,M,
Cluster 03 A6 NA 19-Mar-2017 20-Mar-2017 10:30 AM 21-Mar-2017 A Approved Closed

Termite control surface preparation, installation and final inspection


199 KHEP-CI-0199
for PC foundation
Cluster 08 B2 NA 19-Mar-2017 20-Mar-2017 9:00 AM 21-Mar-2017 A Approved Closed

Building concrete sampling, testing and placement inspection for PC


200 KHEP-CI-0200
foundation
Cluster 08 B2 NA 19-Mar-2017 20-Mar-2017 10:30 AM 22-Mar-2017 A Approved Closed

CMU, Morter and Masonry inspection under exterior reinforced G.B


201 KHEP-CI-0201
(Mockup)
Cluster 69 Zone 4B 19-Mar-2017 20-Mar-2017 9:00 AM 20-Mar-2017 A Approved Closed

Buitomen Painting for CMU, Morter and Masonry inspection under


202 KHEP-CI-0202
exterior reinforced G.B (Mockup)
Cluster 69 Zone 4B 19-Mar-2017 20-Mar-2017 10:00 AM 20-Mar-2017 A Approved Closed

203 KHEP-CI-0203 Compaction test 3rd layer general fill Along Retention Basin 02 Zone 5A 19-Mar-2017 20-Mar-2017 11:00 AM 22-Mar-2017 A Approved Closed
Cast in place concrete formwork inspection for RC Footing axis
204 KHEP-CI-0204
(A,B,C,D,E,F,G,H)
Cluster 43 A6 NA 20-Mar-2017 21-Mar-2017 1:30 PM 22-Mar-2017 A Approved Closed

Installation of reinforcing steel bar, embedded item and form closure


205 KHEP-CI-0205
inspection for RC Foundation axis (A,B,C,D,E,F,G,H)
Cluster 43 A6 NA 20-Mar-2017 21-Mar-2017 1:30 PM 22-Mar-2017 A Approved Closed

Concrete sampling, testing and placement inspection for Footing axis


206 KHEP-CI-0206
(A,B,C,D,E,F,G,H)
Cluster 43 A6 NA 20-Mar-2017 21-Mar-2017 1:30 PM 23-Mar-2017 A Approved Closed

Cast in place concrete formwork inspection for RC Footing axis


207 KHEP-CI-0207
(A,B,C,D,E,F)
Cluster 81 A6 NA 20-Mar-2017 21-Mar-2017 1:30 PM 22-Mar-2017 A Approved Closed

Installation of reinforcing steel bar, embedded item and form closure


208 KHEP-CI-0208
inspection for RC Foundation axis (A,B,C,D,E,F)
Cluster 81 A6 NA 20-Mar-2017 21-Mar-2017 1:30 PM 22-Mar-2017 A Approved Closed

Concrete sampling, testing and placement inspection for Footing axis


209 KHEP-CI-0209
(A,B,C,D,E,F)
Cluster 81 A6 NA 20-Mar-2017 21-Mar-2017 1:30 PM 23-Mar-2017 A Approved Closed

Installation of reinforcing steel bar, embedded item and form closure


210 KHEP-CI-0210
inspection for RC Column Neck axis (B,D,F,H,K,M)
Cluster 01 A6 NA 20-Mar-2017 21-Mar-2017 1:30 PM 22-Mar-2017 A Approved Closed

211 KHEP-CI-0211 Compaction test 8th layer general fill Cluster 06,45 Zone 2A 20-Mar-2017 21-Mar-2017 1:30 PM 22-Mar-2017 A Approved Closed

212 KHEP-CI-0212 Compaction test 1st layer general fill (Under Foundation) Cluster 44 Zone 2A 20-Mar-2017 21-Mar-2017 1:30 PM 22-Mar-2017 E Rejected Closed
212.1 KHEP-CI-0212-01 Compaction test 1st layer general fill (Under Foundation) Cluster 44 Zone 2A 22-Mar-2017 23-Mar-2017 1:30 PM 23-Mar-2017 A Approved Closed
213 KHEP-CI-0213 Compaction test 1st and final layer structural fill (Selected Fill) Cluster 66 Zone 4A 20-Mar-2017 21-Mar-2017 1:30 PM 22-Mar-2017 A Approved Closed
Compaction test 1st general fill around footing (other side) for
214 KHEP-CI-0214
(Mockup)
Cluster 69 Zone 4B 21-Mar-2017 22-Mar-2017 1:30 PM 23-Mar-2017 E Rejected Closed

215 KHEP-CI-0215 Compaction test 7th layer general fill STA, 0+025-STA, 0+100) Road 04 Zone 5A 21-Mar-2017 22-Mar-2017 1:30 PM 23-Mar-2017 E Rejected Closed
215.1 KHEP-CI-0215-01 Compaction test 7th layer general fill STA, 0+025-STA, 0+100) Road 04 Zone 5A 23-Mar-2017 25-Mar-2017 2:30 PM 25-Mar-2017 A Approved Closed

216 KHEP-CI-0216 Compaction test 7th layer general fill Cluster 01 Zone 1A 21-Mar-2017 22-Mar-2017 1:30 PM 23-Mar-2017 A Approved Closed
Compaction test 1st layer general fill around footing (other side) for
217 KHEP-CI-0217
(Mockup)
Cluster 69 Zone 4B 21-Mar-2017 22-Mar-2017 1:30 PM 23-Mar-2017 A Approved Closed

Installation of reinforcing steel bar, embedded item and form closure


218 KHEP-CI-0218
inspection for RC Foundation axis (G,H,J,K,L,M,N)
Cluster 81 A6 NA 21-Mar-2017 22-Mar-2017 2:30 PM 23-Mar-2017 A Approved Closed

Concrete sampling, testing and placement inspection for Footing


219 KHEP-CI-0219
axis (G,H,J,K,L,M,N)
Cluster 81 A6 NA 21-Mar-2017 22-Mar-2017 2:30 PM 25-Mar-2017 A Approved Closed

Cast in place concrete formwork inspection for RC Footing axis


220 KHEP-CI-0220
(J,K,L,M,N)
Cluster 43 A6 NA 21-Mar-2017 22-Mar-2017 2:30 PM 23-Mar-2017 A Approved Closed

Installation of reinforcing steel bar, embedded item and form closure


221 KHEP-CI-0221
inspection for RC Foundation axis (J,K,L,M,N)
Cluster 43 A6 NA 21-Mar-2017 22-Mar-2017 2:30 PM 23-Mar-2017 A Approved Closed

Concrete sampling, testing and placement inspection for Footing axis


222 KHEP-CI-0222
(J,K,L,M,N)
Cluster 43 A6 NA 21-Mar-2017 22-Mar-2017 2:30 PM 25-Mar-2017 A Approved Closed

Termite control surface preparation, installation and final inspection


223 KHEP-CI-0223
for PC foundation
Cluster 07 B2 NA 21-Mar-2017 22-Mar-2017 11:30 AM 23-Mar-2017 A Approved Closed

Blinding concrete sampling, testing & placement inspection for PC


224 KHEP-CI-0224
Foundation
Cluster 07 B2 NA 21-Mar-2017 22-Mar-2017 1:30 PM 23-Mar-2017 A Approved Closed

Termite control surface preparation, installation and final inspection


225 KHEP-CI-0225
for PC foundation
Cluster 14 B2 NA 21-Mar-2017 22-Mar-2017 11:30 AM 23-Mar-2017 A Approved Closed

Blinding concrete sampling, testing & placement inspection for PC


226 KHEP-CI-0226
Foundation
Cluster 14 B2 NA 21-Mar-2017 22-Mar-2017 1:30 PM 23-Mar-2017 A Approved Closed

Termite control surface preparation, installation and final inspection


227 KHEP-CI-0227
for PC foundation
Cluster 15 B2 NA 21-Mar-2017 22-Mar-2017 11:30 AM 23-Mar-2017 A Approved Closed

Blinding concrete sampling, testing & placement inspection for PC


228 KHEP-CI-0228
Foundation
Cluster 15 B2 NA 21-Mar-2017 22-Mar-2017 1:30 PM 23-Mar-2017 A Approved Closed

Cast in place concrete formwork inspection for RC Column neck axis


229 KHEP-CI-0229
(A,B,C,D,E,F,G,H,J,K,L,M,N)
Cluster 02 A6 NA 22-Mar-2017 23-Mar-2017 10:30 AM 23-Mar-2017 A Approved Closed

Concrete sampling, testing and placement inspection for Neck


230 KHEP-CI-0230
column axis (A,B,C,D,E,F,G,H,J,K,L,M,N)
Cluster 02 A6 NA 22-Mar-2017 23-Mar-2017 1:30 PM 25-Mar-2017 A Approved Closed

Termite control surface preparation, installation and final inspection


231 KHEP-CI-0231
for PC foundation
Cluster 66 A6 NA 22-Mar-2017 25-Mar-2017 1:30 PM 25-Mar-2017 A Approved Closed

Blinding concrete sampling, testing & placement inspection for PC


232 KHEP-CI-0232
Foundation
Cluster 66 A6 NA 22-Mar-2017 25-Mar-2017 1:30 PM 26-Mar-2017 A Approved Closed

Cast in place concrete formwork inspection for RC footing axis


233 KHEP-CI-0233
(A,B,C,D,E)
Cluster 68 B2 NA 22-Mar-2017 25-Mar-2017 2:30 PM 25-Mar-2017 A Approved Closed

Installation of reinforcing steel bar, embedded item and form closure


234 KHEP-CI-0234
inspection for RC Foundation axis (A,B,C,D,E)
Cluster 68 B2 NA 22-Mar-2017 25-Mar-2017 2:30 PM 25-Mar-2017 A Approved Closed

Concrete sampling, testing and placement inspection for RC footing


235 KHEP-CI-0235
axis (A,B,C,D,E)
Cluster 68 B2 NA 22-Mar-2017 25-Mar-2017 2:30 PM 25-Mar-2017 A Approved Closed

Approved w/
236 KHEP-CI-0236 Compaction test 4th layer general fill Along Retention Basin 02 Zone 5A 22-Mar-2017 23-Mar-2017 1:30 PM 26-Mar-2017 B comments
Closed

237 KHEP-CI-0237 Compaction test excavation level for foundation prior to structural fill Cluster 65 Zone 4A 22-Mar-2017 23-Mar-2017 1:30 PM 23-Mar-2017 A Approved Closed

238 KHEP-CI-0238 Compaction test excavation level for foundation prior to structural fill Cluster 46 Zone 4A 23-Mar-2017 25-Mar-2017 2:30 PM 25-Mar-2017 E Rejected Closed

238.1 KHEP-CI-0238-01 Compaction test excavation level for foundation prior to structural fill Cluster 46 Zone 4A 26-Mar-2017 27-Mar-2017 1:30 PM 28-Mar-2017 A Approved Closed

Cast in place concrete formwork inspection for RC footing axis


239 KHEP-CI-0239
(A,B,C,D,E)
Cluster 17 B2 NA 25-Mar-2017 26-Mar-2017 2:30 PM 26-Mar-2017 A Approved Closed

Installation of reinforcing steel bar, embedded item and form closure


240 KHEP-CI-0240
inspection for RC Foundation axis (A,B,C,D,E)
Cluster 17 B2 NA 25-Mar-2017 26-Mar-2017 2:30 PM 26-Mar-2017 A Approved Closed

Cast in place concrete formwork inspection for RC Column Neck axis


241 KHEP-CI-0241
(1) @ (B,D,F,H,K,M)
Cluster 01 A6 NA 25-Mar-2017 26-Mar-2017 2:30 PM 26-Mar-2017 A Approved Closed

Installation of reinforcing steel bar, embedded item and form closure


242 KHEP-CI-0242
inspection for RC Column Neck axis (A,B,C,D,E,F,G,H,J,K,L,M,N)
Cluster 04 A6 NA 25-Mar-2017 26-Mar-2017 2:30 PM 26-Mar-2017 A Approved Closed

Compaction test excavation level for foundation prior to structural fill


243 KHEP-CI-0243
(Selected Fill)
Cluster 45 Zone 3A 25-Mar-2017 26-Mar-2017 1:30 PM 28-Mar-2017 A Approved Closed

244 KHEP-CI-0244 Compaction test 1st layer & Final layer structural fill (Selected fill) Cluster 65 Zone 4A 25-Mar-2017 26-Mar-2017 1:30 PM 26-Mar-2017 A Approved Closed

Cast in place concrete formwork inspection for RC Footing axis


245 KHEP-CI-0245
(A,B,C,D,E)
Cluster 08 B2 NA 26-Mar-2017 27-Mar-2017 2:30 PM 28-Mar-2017 A Approved Closed

Installation of reinforcing steel bar, embedded item and form closure


246 KHEP-CI-0246
inspection for RC Footing axis (A,B,C,D,E)
Cluster 08 B2 NA 26-Mar-2017 27-Mar-2017 2:30 PM 28-Mar-2017 A Approved Closed
Installation of reinforcing steel bar, embedded item and form closure
247 KHEP-CI-0247
inspection fo RC Column Neck axis (A,B,C,D,E,F,G,H,J,K,L,M,N)
Cluster 81 A6 NA 26-Mar-2017 27-Mar-2017 2:30 PM 28-Mar-2017 E Rejected Closed

Installation of reinforcing steel bar, embedded item and form closure


247.1 KHEP-CI-0247-01
inspection fo RC Column Neck axis (A,B,C,D,E,F,G,H,J,K,L,M,N)
Cluster 81 A6 NA 28-Mar-2017 29-Mar-2017 2:30 PM 1-Apr-2017 A Approved Closed

Cast in place concrete formwork inspection for RC Footing axis


248 KHEP-CI-0248
(A,B,C,D,E)
Cluster 07 B2 NA 26-Mar-2017 27-Mar-2017 2:30 PM 28-Mar-2017 A Approved Closed

Installation of reinforcing steel bar, embedded item and form closure


249 KHEP-CI-0249
inspection for RC Foundation axis (A,B,C,D,E)
Cluster 07 B2 NA 26-Mar-2017 27-Mar-2017 2:30 PM 28-Mar-2017 A Approved Closed

250 KHEP-CI-0250 Compaction test 1st and final layer structural fill Cluster 44 Zone 2A 26-Mar-2017 27-Mar-2017 1:00 PM 28-Mar-2017 A Approved Closed
251 KHEP-CI-0251 Compaction test 8th and final layer structural fill Cluster 01 Zone 1A 26-Mar-2017 27-Mar-2017 1:00 PM 28-Mar-2017 A Approved Closed
Compaction test 8th and final layer structural fill sta, 0+025-STA,
252 KHEP-CI-0252
0+100)
Road 04 Zone 5A 26-Mar-2017 27-Mar-2017 1:00 PM 28-Mar-2017 E Rejected Closed

Compaction test 8th and final layer structural fill sta, 0+025-STA,
252.1 KHEP-CI-0252-01
0+100)
Road 04 Zone 5A 28-Mar-2017 29-Mar-2017 2:00 PM 30-Mar-2017 E Rejected Closed

252.2 KHEP-CI-0252-02 Compaction test 8th layer general fill sta, 0+025-STA, 0+100) Road 04 Zone 5A 30-Mar-2017 1-Apr-2017 10:00 AM 3-Apr-2017 A Approved Closed

Termite control surface preparation, installation and final inspection


253 KHEP-CI-0253
for PC foundation
Cluster 65 A6 NA 27-Mar-2017 28-Mar-2017 1:30 PM 29-Mar-2017 A Approved Closed

Cast in place concrete formwork inspection for RC Footing axis


254 KHEP-CI-0254
(H,J,K,L,M,N)
Cluster 66 A6 NA 27-Mar-2017 28-Mar-2017 2:30 PM 29-Mar-2017 A Approved Closed

Installation of reinforcing steel bar, embedded item and form closure


255 KHEP-CI-0255
inspection fo RC foundation axis (H,J,K,L,M,N)
Cluster 66 A6 NA 27-Mar-2017 28-Mar-2017 2:30 PM 29-Mar-2017 A Approved Closed

Damproofing surface preparation for RC foundation & column neck


256 KHEP-CI-0256
axis (A,B,C,D,E,F,G,H,J,K,L,M,N)
Cluster 01 A6 NA 27-Mar-2017 28-Mar-2017 2:30 PM 29-Mar-2017 E Rejected Closed

Damproofing surface preparation for RC foundation & column neck


256.1 KHEP-CI-0256-01
As per attached Highlighted Drwg.
Cluster 01 A6 NA 4-Apr-2017 5-Apr-2017 2:30 PM 8-Apr-2017 A Approved Closed

257 KHEP-CI-0257 Compaction test 1st and final layer structural fill (selected fill) Cluster 45 Zone 3A 27-Mar-2017 28-Mar-2017 2:00 PM 29-Mar-2017 A Approved Closed
Concrete sampling, testing and placement inspection for RC footing
258 KHEP-CI-0258
axis (A,B,C,D,E)
Cluster 17 B2 NA 27-Mar-2017 28-Mar-2017 1:30 PM 28-Mar-2017 A Approved Closed

Concrete sampling, testing and placement inspection for RC Column


259 KHEP-CI-0259
neck axis (1)@ (,B,,D,F,H,K,M)
Cluster 01 A6 NA 27-Mar-2017 28-Mar-2017 1:30 PM 28-Mar-2017 A Approved Closed

Compaction test and surface preparation of excavation level for


260 KHEP-CI-0260
foundation prior to structural fill (selected fill)
Cluster 06 Zone 1B 27-Mar-2017 28-Mar-2017 2:00 PM 29-Mar-2017 A Approved Closed

Termite control surface preparation, installation and final inspection


261 KHEP-CI-0261
for PC Foundation
Cluster 44 A6 NA 28-Mar-2017 29-Mar-2017 1:30 PM 1-Apr-2017 A Approved Closed

Cast in place concrete formwork inspection for RC Footing axis


262 KHEP-CI-0262
(A,B,C,D,E)
Cluster 14 B2 NA 28-Mar-2017 29-Mar-2017 2:30 PM 30-Mar-2017 A Approved Closed

Installation of reinforcing steel bar, embedded item and form closure


263 KHEP-CI-0263
inspection for RC Foundation axis (A,B,C,D,E)
Cluster 14 B2 NA 28-Mar-2017 29-Mar-2017 2:30 PM 30-Mar-2017 A Approved Closed

Cast in place concrete formwork inspection for RC Footing axis


264 KHEP-CI-0264
(A,B,C,D,E)
Cluster 15 B2 NA 28-Mar-2017 29-Mar-2017 2:30 PM 1-Apr-2017 A Approved Closed

Installation of reinforcing steel bar, embedded item and form closure


265 KHEP-CI-0265
inspection for RC Foundation axis (A,B,C,D,E)
Cluster 15 B2 NA 28-Mar-2017 29-Mar-2017 2:30 PM 1-Apr-2017 A Approved Closed

Cast in place concrete formwork inspection for RC Column Neck axis


266 KHEP-CI-0266
(A,B,C,D,E,F,G,H,J,K,L,M,N)
Cluster 03 A6 NA 28-Mar-2017 29-Mar-2017 2:30 PM 30-Mar-2017 A Approved Closed

267 KHEP-CI-0267 Compaction test 5th layer general fill (selected fill) (Along Retention Basin 02 Zone 5A 28-Mar-2017 29-Mar-2017 2:00 PM 30-Mar-2017 E Rejected Closed

Approved w/
267.1 KHEP-CI-0267-01 Compaction test 5th layer general fill (selected fill) (Along Retention Basin 02 Zone 5A 30-Jan-2017 1-Apr-2017 10:00 AM 2-Apr-2017 B comments
Closed

268 KHEP-CI-0268 Compaction test 1st and final layer structural fill (selected fill) Cluster 46 Zone 3A 28-Mar-2017 29-Mar-2017 2:00 PM 30-Mar-2017 E Rejected Closed
268.1 KHEP-CI-0268-01 Compaction test 1st and final layer structural fill (selected fill) Cluster 46 Zone 3A 30-Jan-2017 1-Apr-2017 10:00 AM 2-Apr-2017 A Approved Closed
Concrete sampling, testing and placement inspection for RC footing
269 KHEP-CI-0269
axis (A,B,C,D,E)
Cluster 08 B2 NA 29-Mar-2017 30-Mar-2017 9:30 AM 30-Mar-2017 A Approved Closed

Concrete sampling, testing and placement inspection for RC footing


270 KHEP-CI-0270
axis (A,B,C,D,E)
Cluster 07 B2 NA 29-Mar-2017 30-Mar-2017 9:30 AM 30-Mar-2017 A Approved Closed

Blinding concrete sampling, testing & placement inspection for


271 KHEP-CI-0271
Footing axis (A,B,C,D,E,F,G,H,J,K,L,M,N)
Cluster 65 A6 NA 29-Mar-2017 30-Mar-2017 9:30 AM 30-Mar-2017 A Approved Closed

Concrete sampling, testing and placement inspection for RC footing


272 KHEP-CI-0272
axis (H,J,K,L,M,N)
Cluster 66 A6 NA 29-Mar-2017 30-Mar-2017 9:30 AM 30-Mar-2017 A Approved Closed

Cast in place concrete formwork inspection for RC Footing axis


273 KHEP-CI-0273
((A,B,C,D,E,F,G)
Cluster 66 A6 NA 29-Mar-2017 30-Mar-2017 11:00 AM 1-Apr-2017 A Approved Closed

Installation of reinforcing steel bar, embedded item and form closure


274 KHEP-CI-0274
inspection fo RC foundation axis ((A,B,C,D,E,F,G)
Cluster 66 A6 NA 29-Mar-2017 30-Mar-2017 11:00 AM 1-Apr-2017 A Approved Closed
Building concrete sampling, testing and placement inspection for RC
275 KHEP-CI-0275
footing axis ((A,B,C,D,E,F,G,H,J,K,L,M,N)
Cluster 44 A6 NA 30-Mar-2017 1-Apr-2017 9:30 AM 2-Apr-2017 A Approved Closed

Termite control surface preparation, installation and final inspection


276 KHEP-CI-0276
for PC foundation
Cluster 45 A6 NA 30-Mar-2017 1-Apr-2017 1:30 PM 2-Apr-2017 A Approved Closed

Building concrete sampling, testing and placement inspection for RC


277 KHEP-CI-0277
footing axis ((A,B,C,D,E,F,G,H,J,K,L,M,N)
Cluster 45 A6 NA 30-Mar-2017 1-Apr-2017 1:30 PM 2-Apr-2017 A Approved Closed

Compaction test and surface preparation, excavation level of the


278 KHEP-CI-0278
foundation level
Cluster 16 Zone 1B 30-Mar-2017 1-Apr-2017 1:30 PM 2-Apr-2017 A Approved Closed

279 KHEP-CI-0279 Compaction test 1st and final layer structural fill (selected fill) Cluster 06 Zone 1B 30-Mar-2017 1-Apr-2017 1:30 PM 2-Apr-2017 A Approved Closed
Concrete sampling, testing and placement inspection for RC Neck
280 KHEP-CI-0280
Column axis ((A,B,C,D,E,F,G,H,J,K,L,M,N)
Cluster 03 A6 NA 1-Apr-2017 2-Apr-2017 9:30 AM 2-Apr-2017 A Approved Closed

Concrete sampling, testing and placement inspection for RC footing


281 KHEP-CI-0281
axis (A,B,C,D,E,)
Cluster 14 B2 NA 1-Apr-2017 2-Apr-2017 8:30 AM 2-Apr-2017 A Approved Closed

Concrete sampling, testing and placement inspection for RC footing


282 KHEP-CI-0282
axis (A,B,C,D,E,)
Cluster 15 B2 NA 1-Apr-2017 2-Apr-2017 10:30 AM 2-Apr-2017 A Approved Closed

Installation of reinforcing steel bar, embedded item and form closure


283 KHEP-CI-0283
inspection for RC Column Neck axis (A,B,C,D,E,)
Cluster 17 B2 NA 1-Apr-2017 2-Apr-2017 2:30 PM 3-Apr-2017 A Approved Closed

Cast in place concrete formwork inspection for RC Footing axis


284 KHEP-CI-0284
(H,J,K,L,M,N)
Cluster 65 A6 NA 1-Apr-2017 2-Apr-2017 2:30 PM 3-Apr-2017 A Approved Closed

Installation of reinforcing steel bar, embedded item and form closure


285 KHEP-CI-0285
inspection for RC Foundation axis (H,J,K,L,M,N)
Cluster 65 A6 NA 1-Apr-2017 2-Apr-2017 2:30 PM 2-Apr-2017 A Approved Closed

Cast in place concrete formwork inspection for RC Footing axis


286 KHEP-CI-0286
((A,B,C,D,E,F)
Cluster 44 A6 NA 1-Apr-2017 2-Apr-2017 2:30 PM 3-Apr-2017 A Approved Closed

Installation of reinforcing steel bar, embedded item and form closure


287 KHEP-CI-0287
inspection for RC Foundation axis (A,B,C,D,E,F)
Cluster 44 A6 NA 1-Apr-2017 2-Apr-2017 2:30 PM 3-Apr-2017 A Approved Closed

Concrete sampling, testing and placement inspection for RC footing


288 KHEP-CI-0288
axis ((A,B,C,D,E,F,G)
Cluster 66 A6 NA 2-Apr-2017 3-Apr-2017 9:30 AM 3-Apr-2017 A Approved Closed

Installation of reinforcing steel bar, embedded item and form closure


289 KHEP-CI-0289
inspection for RC Column Neck axis ((A,B,C,D,E)
Cluster 07 B2 NA 2-Apr-2017 3-Apr-2017 2:30 PM 4-Apr-2017 E Rejected Closed

Installation of reinforcing steel bar, embedded item and form closure


289.1 KHEP-CI-0289-01
inspection for RC Column Neck axis ((A,B,C,D,E)
Cluster 07 B2 NA 4-Apr-2017 5-Apr-2017 2:30 PM 5-Apr-2017 E Rejected Closed

Installation of reinforcing steel bar, embedded item and form closure


289.2 KHEP-CI-0289-2
inspection for RC Column Neck axis ((A,B,C,D,E)
Cluster 07 B2 NA 6-Apr-2017 8-Apr-2017 2:30 PM 9-Apr-2017 A Approved Closed

Installation of reinforcing steel bar, embedded item and form closure


290 KHEP-CI-0290
inspection for RC Column Neck axis ((A,B,C,D,E)
Cluster 08 B2 NA 2-Apr-2017 3-Apr-2017 2:30 PM 4-Apr-2017 A Approved Closed

Installation of reinforcing steel bar, embedded item and form closure


291 KHEP-CI-0291
inspection for RC Column Neck axis ((A,B,C,D,E)
Cluster 68 B2 NA 2-Apr-2017 3-Apr-2017 2:30 PM 4-Apr-2017 A Approved Closed

Cast in place concrete formwork inspection for RC Footing axis


292 KHEP-CI-0292
(D,E,F,G)
Cluster 65 A6 NA 2-Apr-2017 3-Apr-2017 2:30 PM 4-Apr-2017 A Approved Closed

Installation of reinforcing steel bar, embedded item and form closure


293 KHEP-CI-0293
inspection for RC Foundation axis (D,E,F,G)
Cluster 65 A6 NA 2-Apr-2017 3-Apr-2017 2:30 PM 3-Apr-2017 A Approved Closed

Termite control surface preparation, installation and final inspection


294 KHEP-CI-0294
for PC foundation
Cluster 46 A6 NA 2-Apr-2017 4-Apr-2017 1:30 PM 4-Apr-2017 A Approved Closed

Blinding concrete sampling, testing & placement inspection for


295 KHEP-CI-0295
Footing axis ((A,B,C,D,E,F,G,H,J,K,L,M,N)
Cluster 46 A6 NA 2-Apr-2017 3-Apr-2017 1:30 PM 4-Apr-2017 A Approved Closed

Approved w/
296 KHEP-CI-0296 Compaction test 1st and final layer structural fill (selected fill) Cluster 16 Zone 1B 2-Apr-2017 3-Apr-2017 1:30 PM 4-Apr-2017 B comments
Closed

Compaction test 1st layer general fill Changed to Compaction test for
297 KHEP-CI-0297
existing grade formation
Cluster 05 Zone 1B 2-Apr-2017 3-Apr-2017 1:30 PM 5-Apr-2017 A Approved Closed

Cast in place concrete formwork inspection for RC Footing axis


298 KHEP-CI-0298
(G,H,J,K)
Cluster 44 A6 NA 2-Apr-2017 3-Apr-2017 2:30 PM 4-Apr-2017 A Approved Closed

Installation of reinforcing steel bar, embedded item and form closure


299 KHEP-CI-0299
inspection for RC Foundation axis (G,H,J,K)
Cluster 44 A6 NA 2-Apr-2017 3-Apr-2017 2:30 PM 4-Apr-2017 A Approved Closed

Compaction test & surface preparation of excavation level for


300 KHEP-CI-0300 foundation Changed to Compaction test inspection of excavated Cluster 73 Zone 4B 2-Apr-2017 3-Apr-2017 2:30 PM 4-Apr-2017 A Approved Closed
grade formation
Compaction test & surface preparation of excavation level for
Approved w/
301 KHEP-CI-0301 foundation Changed to Compaction test inspection of excavated Cluster 72 Zone 4B 2-Apr-2017 3-Apr-2017 2:30 PM 4-Apr-2017 B comments
Closed
grade formation
Installation of reinforcing steel bar, embedded item and form closure
302 KHEP-CI-0302
inspection for RC Grad Mockup
Cluster 69 B2 NA 2-Apr-2017 3-Apr-2017 2:30 PM 4-Apr-2017 E Rejected Closed

Installation of reinforcing steel bar, embedded item and form closure


302.1 KHEP-CI-0302-1
inspection for RC Grad Mockup
Cluster 69 B2 NA 10-Apr-2017 11-Apr-2017 2:30 PM 12-Apr-2017 A Approved Closed

Cast in place concrete formwork inspection for RC Grad Beam


303 KHEP-CI-0303
Mockup
Cluster 69 B2 NA 2-Apr-2017 3-Apr-2017 2:30 PM 4-Apr-2017 E Rejected Closed
303.1 KHEP-CI-0303-1 Cast in place concrete formwork inspection for RC Grad Beam Cluster 69 B2 NA 10-Apr-2017 11-Apr-2017 2:30 PM 12-Apr-2017 A Approved Closed

Cast in place concrete formwork inspection for RC Footing axis


304 KHEP-CI-0304
(L,M,N)
Cluster 44 A6 NA 3-Apr-2017 4-Apr-2017 2:30 PM 5-Apr-2017 A Approved Closed

Installation of reinforcing steel bar, embedded item and form closure


305 KHEP-CI-0305
inspection for RC Foundation axis (L,M,N)
Cluster 44 A6 NA 3-Apr-2017 4-Apr-2017 2:30 PM 5-Apr-2017 A Approved Closed

Cast in place concrete formwork inspection for RC Footing axis


306 KHEP-CI-0306
(A,B,C)
Cluster 65 A6 NA 3-Apr-2017 4-Apr-2017 2:30 PM 5-Apr-2017 A Approved Closed

Installation of reinforcing steel bar, embedded item and form closure


307 KHEP-CI-0307
inspection for RC Foundation axis (A,B,C)
Cluster 65 A6 NA 3-Apr-2017 4-Apr-2017 2:30 PM 5-Apr-2017 A Approved Closed

Installation of reinforcing steel bar, embedded item and form closure


308 KHEP-CI-0308
inspection for RC Column Neck axis (A,B,C,D,E,)
Cluster 14 B2 NA 3-Apr-2017 4-Apr-2017 2:30 PM 5-Apr-2017 A Approved Closed

Installation of reinforcing steel bar, embedded item and form closure


309 KHEP-CI-0309
inspection for RC Column Neck axis (A,B,C,D,E,)
Cluster 15 B2 NA 3-Apr-2017 4-Apr-2017 2:30 PM 5-Apr-2017 A Approved Closed

Concrete sampling, testing and placement inspection for RC footing


310 KHEP-CI-0310
axis (H,J,K,L,M,N)
Cluster 65 A6 NA 3-Apr-2017 4-Apr-2017 9:30 AM 4-Apr-2017 A Approved Closed

Concrete sampling, testing and placement inspection for RC footing


311 KHEP-CI-0311
axis (A,B,C,D,E,F)
Cluster 44 A6 NA 3-Apr-2017 4-Apr-2017 9:30 AM 4-Apr-2017 A Approved Closed

312 KHEP-CI-0312 Compaction test 6th layer general fill (Along Retention Basin 02 Zone 5A 3-Apr-2017 4-Apr-2017 1:30 PM 6-Apr-2017 A Approved Closed
313 KHEP-CI-0313 Compaction test 9th layer general fill STA, 0+025 to 0+100)) Road 04 Zone 5A 3-Apr-2017 4-Apr-2017 1:30 PM 6-Apr-2017 A Approved Closed
Approved w/
314 KHEP-CI-0314 Survey Inspection for new bench mark As per Highlighted drwg. NA NA 3-Apr-2017 4-Apr-2017 10:00 AM 6-Apr-2017 B comments
Closed

Cast in place concrete formwork inspection for RC Footing axis


315 KHEP-CI-0315
(H,J,K,L,M,N)
Cluster 45 A6 NA 4-Apr-2017 5-Apr-2017 2:30 PM 5-Apr-2017 A Approved Closed

Installation of reinforcing steel bar, embedded item and form closure


316 KHEP-CI-0316
inspection for RC Foundation axis (H,J,K,L,M,N)
Cluster 45 A6 NA 4-Apr-2017 5-Apr-2017 2:30 PM 5-Apr-2017 A Approved Closed

Concrete sampling, testing and placement inspection for RC footing


317 KHEP-CI-0317
axis (D,E,F,G)
Cluster 65 A6 NA 4-Apr-2017 5-Apr-2017 9:30 AM 5-Apr-2017 A Approved Closed

Concrete sampling, testing and placement inspection for RC footing


318 KHEP-CI-0318
axis (G,H,J,K)
Cluster 44 A6 NA 4-Apr-2017 5-Apr-2017 9:30 AM 5-Apr-2017 A Approved Closed

Compaction test & surface preparation of excavation level for


319 KHEP-CI-0319
foundation
Cluster 63 Zone 3B 4-Apr-2017 5-Apr-2017 9:30 AM 6-Apr-2017 A Approved Closed

Compaction test & surface preparation of excavation level for


320 KHEP-CI-0320
foundation
Cluster 64 Zone 3B 4-Apr-2017 5-Apr-2017 9:30 AM 6-Apr-2017 A Approved Closed

321 KHEP-CI-0321 Compaction test 1st and final layer structural fill (selected fill) Cluster 72 Zone 4B 4-Apr-2017 5-Apr-2017 9:30 AM 6-Apr-2017 A Approved Closed
322 KHEP-CI-0322 Compaction test 1st and final layer structural fill (selected fill) Cluster 73 Zone 4B 4-Apr-2017 5-Apr-2017 9:30 AM 6-Apr-2017 A Approved Closed
Compaction test & surface preparation of excavation level for
323 KHEP-CI-0323
foundation
Cluster 75 B2 Zone 4B 4-Apr-2017 5-Apr-2017 9:30 AM 6-Apr-2017 A Approved Closed

Installation of reinforcing steel bar, embedded item and form closure


324 KHEP-CI-0324
inspection for RC Column Neck axis ((A,B,C,D,E,F,G,H,J,K,L,M,N)
Cluster 43 A6 NA 5-Apr-2017 6-Apr-2017 2:30 PM 8-Apr-2017 A Approved Closed

Cast in place concrete formwork inspection for RC Footing axis


325 KHEP-CI-0325
(A,B,C,D,E)
Cluster 46 A6 NA 5-Apr-2017 6-Apr-2017 2:30 PM 8-Apr-2017 A Approved Closed

Installation of reinforcing steel bar, embedded item and form closure


326 KHEP-CI-0326
inspection for RC Foundation axis (A,B,C,D,E)
Cluster 46 A6 NA 5-Apr-2017 6-Apr-2017 2:30 PM 8-Apr-2017 A Approved Closed

Concrete sampling, testing and placement inspection for RC footing Approved w/


327 KHEP-CI-0327
axis (L,M,N)
Cluster 44 A6 NA 5-Apr-2017 6-Apr-2017 9:30 AM 8-Apr-2017 B comments
Closed

Concrete sampling, testing and placement inspection for RC footing Approved w/


328 KHEP-CI-0328
axis (A,B,C)
Cluster 65 A6 NA 5-Apr-2017 6-Apr-2017 9:30 AM 8-Apr-2017 B comments
Closed

329 KHEP-CI-0329 Compaction test 1st and final layer structural fill (selected fill) Cluster 05 Zone 1B 5-Apr-2017 6-Apr-2017 3:00 PM 8-Apr-2017 A Approved Closed
Compaction test & surface preparation of excavation level for
330 KHEP-CI-0330
foundation
Cluster 12 Zone 1B 5-Apr-2017 6-Apr-2017 3:00 PM 8-Apr-2017 E Rejected Closed

330.1 KHEP-CI-0330-01 Compaction test at excavated formation level of foundation Cluster 12 Zone 1B 8-Apr-2017 9-Apr-2017 3:00 PM 11-Apr-2017 A Approved Closed
Compaction test & surface preparation of excavation level for
331 KHEP-CI-0331
foundation
Cluster 13 Zone 1B 5-Apr-2017 6-Apr-2017 3:00 PM 4-Apr-2017 A Approved Closed

Compaction test & surface preparation of excavation level for Approved w/


332 KHEP-CI-0332
foundation
Cluster 71 Zone 4B 5-Apr-2017 6-Apr-2017 3:00 PM 8-Apr-2017 B comments
Closed

Termite control surface preparation, installation and final inspection


333 KHEP-CI-0333
for PC foundation
Cluster 72 NA 6-Apr-2017 8-Apr-2017 1:30 PM 9-Apr-2017 A Approved Closed

Blinding concrete sampling, testing & placement inspection for


334 KHEP-CI-0334
Footing
Cluster 72 NA 6-Apr-2017 8-Apr-2017 1:30 PM 9-Apr-2017 A Approved Closed

Termite control surface preparation, installation and final inspection


335 KHEP-CI-0335
for PC foundation
Cluster 73 NA 6-Apr-2017 8-Apr-2017 1:30 PM 9-Apr-2017 A Approved Closed
Blinding concrete sampling, testing & placement inspection for
336 KHEP-CI-0336
Footing
Cluster 73 NA 6-Apr-2017 8-Apr-2017 1:30 PM 9-Apr-2017 A Approved Closed

Cast in place concrete formwork inspection for RC Column Neck axis


337 KHEP-CI-0337
((A,B,C,D,E,F,G,H,J,K,L,M,N)
Cluster 81 A6 NA 6-Apr-2017 8-Apr-2017 2:30 PM 9-Apr-2017 A Approved Closed

Cast in place concrete formwork inspection for RC Column Neck axis


338 KHEP-CI-0338
(A,B,C,D,E,)
Cluster 17 B2 NA 6-Apr-2017 8-Apr-2017 2:30 PM 9-Apr-2017 A Approved Closed

Cast in place concrete formwork inspection for RC Column Neck axis


339 KHEP-CI-0339
(A,B,C,D,E,)
Cluster 68 B2 NA 6-Apr-2017 8-Apr-2017 2:30 PM 9-Apr-2017 A Approved Closed

Cast in place concrete formwork inspection for RC Column Neck axis


340 KHEP-CI-0340
(A,B,C,D,E,)
Cluster 08 B2 NA 6-Apr-2017 8-Apr-2017 2:30 PM 9-Apr-2017 A Approved Closed

Concrete sampling, testing and placement inspection for RC footing


341 KHEP-CI-0341
axis (H,J,K,L,M,N)
Cluster 45 A6 NA 6-Apr-2017 8-Apr-2017 9:30 AM 9-Apr-2017 A Approved Closed

342 KHEP-CI-0342 Compaction test 1st & final layer structural fill (Selected fill) Cluster 64 Zone 3B 6-Apr-2017 8-Apr-2017 3:00 PM 9-Apr-2017 A Approved Closed
343 KHEP-CI-0343 Compaction test 9th layer general fill STA, 0+025 to 0+100)) Road 04 Zone 5A 6-Apr-2017 8-Apr-2017 3:00 PM 8-Apr-2017 E Rejected Closed

343.1 KHEP-CI-0344 Compaction test 10th layer general fill STA, 0+025 to 0+100 ) Road 04 Zone 5A 8-Apr-2017 9-Apr-2017 3:00 PM 11-Apr-2017 A Approved Closed

344 KHEP-CI-0345 Compaction test 1st & final layer structural fill (Selected fill) Cluster 63 Zone 3B 6-Apr-2017 8-Apr-2017 3:00 PM 9-Apr-2017 A Approved Closed
345 KHEP-CI-0346 Compaction test at excavated formation level of foundation Cluster 10 Zone 1B 6-Apr-2017 8-Apr-2017 3:00 PM 9-Apr-2017 A Approved Closed
346 KHEP-CI-0347 Compaction test at excavated formation level of foundation Cluster 11 Zone 1B 6-Apr-2017 8-Apr-2017 3:00 PM 9-Apr-2017 A Approved Closed
347 KHEP-CI-0348 Compaction test 1st & final layer structural fill(Selected fill) Cluster 75 Zone 4B 6-Apr-2017 8-Apr-2017 2:30 PM 9-Apr-2017 A Approved Closed
348 KHEP-CI-0349 Compaction test & formation existing level Alley 02,11 Zone 1B 6-Apr-2017 8-Apr-2017 2:30 PM 8-Apr-2017 E Rejected Closed
Compaction test & formation existing level (STA,0+025 to 0+0117)
348.1 KHEP-CI-0348-01
(STA,0+75 to 0+1000)
ALLEY 02 Zone 1B 8-Apr-2017 9-Apr-2017 3:00 PM 11-Apr-2017 E Rejected Closed

Compaction test & formation existing level (STA,0+025 to 0+0117)


348.2 KHEP-CI-0348-02
(STA,0+75 to 0+1000)
ALLEY 02,11 Zone 1B 11-Apr-2017 12-Apr-2017 3:00 PM 15-Apr-2017 A Approved Closed

Zone 1B /
349 KHEP-CI-0349 Compaction test & formation existing level Alley # 12 & NA 6-Apr-2017 8-Apr-2017 2:30 PM 8-Apr-2017 E Rejected Closed
Alley # 13

Zone 1B
(ALLEY No,:
01
(STA,0+025
to 0+100)
ALLEY
349.1 KHEP-CI-0349-01 Compaction test & formation existing level No,: 012 NA 8-Apr-2017 9-Apr-2017 3:00 PM 11-Apr-2017 E Rejected Closed
(STA,0+00 to
0+50)
ALLEY No,:
013
(STA,0+000
to 0+50)

Zone 1B
(ALLEY No,:
01
(STA,0+025
to 0+100)
ALLEY
349.2 KHEP-CI-0349-02 Compaction test & formation existing level No,: 012 NA 11-Apr-2017 12-Apr-2017 3:00 PM 15-Apr-2017 A Approved Closed
(STA,0+00 to
0+50)
ALLEY No,:
013
(STA,0+000
to 0+50)
Termite control surface preparation, installation and final inspection
350 KHEP-CI-0350
for PC foundation As per Highlighted drwg.
Cluster 05 B2 NA 8-Apr-2017 9-Apr-2017 10:30 AM 9-Apr-2017 A Approved Closed

Blinding concrete sampling, testing & placement inspection for


351 KHEP-CI-0351
Footing As per Highlighted drwg.
Cluster 05 B2 NA 8-Apr-2017 9-Apr-2017 1:30 PM 10-Apr-2017 A Approved Closed

Cast in place concrete formwork inspection for RC Footing axis


352 KHEP-CI-0352
(A,B,C,D,E,F,G)
Cluster 45 A6 NA 8-Apr-2017 9-Apr-2017 2:30 PM 10-Apr-2017 A Approved Closed

Installation of reinforcing steel bar, embedded item and form closure


353 KHEP-CI-0353
inspection for RC Footing axis (A,B,C,D,E,F,G)
Cluster 45 A6 NA 8-Apr-2017 9-Apr-2017 2:30 PM 10-Apr-2017 A Approved Closed
Installation of reinforcing steel bar, embedded item and form closure
354 KHEP-CI-0354
inspection for RC Column Neck axis (A,B,C,D,E,F,G,H,J,K,L,M,N)
Cluster 44 A6 NA 8-Apr-2017 9-Apr-2017 2:30 PM 10-Apr-2017 A Approved Closed

Cast in place concrete formwork inspection for RC Column Neck axis


355 KHEP-CI-0355
(A,B,C,D,E)
Cluster 07 B2 NA 8-Apr-2017 9-Apr-2017 2:30 PM 10-Apr-2017 A Approved Closed

First Coat, Damproofing Installation Inspection for RC footing &


356 KHEP-CI-0356
column neck axis (A,B,C,D,E,F,G,H,J,K,L,M,N)
Cluster 01 A6 NA 8-Apr-2017 9-Apr-2017 3:30 PM 10-Apr-2017 A Approved Closed

Zone 1B- C-
357 KHEP-CI-0357 Compaction test 1st & final layer structural fill (Selected fill)
13
NA 8-Apr-2017 9-Apr-2017 3:30 PM 10-Apr-2017 A Approved Closed

Zone 4B- C-
358 KHEP-CI-0358 Compaction test 1st & final layer structural fill (Selected fill)
71
NA 8-Apr-2017 9-Apr-2017 3:30 PM 11-Apr-2017 A Approved Closed

Zone 3B- C-
359 KHEP-CI-0359 Compaction test at excavated formation level of foundation
54
NA 8-Apr-2017 9-Apr-2017 3:30 PM 10-Apr-2017 E Rejected Closed

Zone 3B- C-
359.1 KHEP-CI-0359-1 Compaction test of excavated formation level for foundation
54
NA 10-Apr-2017 11-Apr-2017 3:30 PM 12-Apr-2017 A Approved Closed

Zone 3B- C-
360 KHEP-CI-0360 Compaction test at excavated formation level of foundation
58
NA 8-Apr-2017 9-Apr-2017 3:30 PM 10-Apr-2017 A Approved Closed

Zone 1B- C-
361 KHEP-CI-0361 Compaction test at excavated formation level of foundation
20
NA 8-Apr-2017 9-Apr-2017 3:30 PM 11-Apr-2017 E Rejected Closed

Zone 1B- C-
361.1 KHEP-CI-0361-1 Compaction test of excavated formation level for foundation
20
NA 11-Apr-2017 12-Apr-2017 3:30 PM 15-Apr-2017 A Approved Closed

Termite control surface preparation, installation and final inspection


362 KHEP-CI-0362
for PC foundation
Cluster 63 B2 NA 9-Apr-2017 10-Apr-2017 10:30 AM 11-Apr-2017 A Approved Closed

Blinding concrete sampling, testing & placement inspection for


363 KHEP-CI-0363
Footing
Cluster 63 B2 NA 9-Apr-2017 10-Apr-2017 1:30 PM 11-Apr-2017 A Approved Closed

Termite control surface preparation, installation and final inspection


364 KHEP-CI-0364
for PC foundation
Cluster 64 B2 NA 9-Apr-2017 10-Apr-2017 10:30 AM 11-Apr-2017 A Approved Closed

Blinding concrete sampling, testing & placement inspection for


365 KHEP-CI-0365
Footing
Cluster 64 B2 NA 9-Apr-2017 10-Apr-2017 1:30 PM 11-Apr-2017 A Approved Closed

Termite control surface preparation, installation and final inspection


366 KHEP-CI-0366
for PC foundation
Cluster 75 B2 NA 9-Apr-2017 10-Apr-2017 10:30 AM 11-Apr-2017 A Approved Closed

Blinding concrete sampling, testing & placement inspection for


367 KHEP-CI-0367
Footing
Cluster 75 B2 NA 9-Apr-2017 10-Apr-2017 1:30 PM 11-Apr-2017 A Approved Closed

Termite control surface preparation, installation and final inspection Cluster 16


368 KHEP-CI-0368
for PC foundation BC4
NA 9-Apr-2017 10-Apr-2017 10:30 AM 11-Apr-2017 A Approved Closed

Blinding concrete sampling, testing & placement inspection for Cluster 16


369 KHEP-CI-0369
Footing BC4
NA 9-Apr-2017 10-Apr-2017 1:30 PM 11-Apr-2017 A Approved Closed

Termite control surface preparation, installation and final inspection Cluster 06


370 KHEP-CI-0370
for PC foundation BC4
NA 9-Apr-2017 10-Apr-2017 10:30 AM 11-Apr-2017 A Approved Closed

Blinding concrete sampling, testing & placement inspection for Cluster 06


371 KHEP-CI-0371
Footing BC4
NA 9-Apr-2017 10-Apr-2017 1:30 PM 11-Apr-2017 A Approved Closed

Cast in place concrete formwork inspection for RC Footing axis


372 KHEP-CI-0372
(A,B,C,D,E)
Cluster 72 B2 NA 9-Apr-2017 10-Apr-2017 2:30 PM 11-Apr-2017 A Approved Closed

Installation of reinforcing steel bar, embedded item and form closure


373 KHEP-CI-0373
inspection for RC Footing axis (A,B,C,D,E)
Cluster 72 B2 NA 9-Apr-2017 10-Apr-2017 2:30 PM 11-Apr-2017 A Approved Closed

Cast in place concrete formwork inspection for RC Footing axis


374 KHEP-CI-0374
(F,G,H,J,)
Cluster 46 A6 NA 9-Apr-2017 10-Apr-2017 2:30 PM 11-Apr-2017 A Approved Closed

Installation of reinforcing steel bar, embedded item and form closure


375 KHEP-CI-0375
inspection for RC Footing axis (F,G,H,J,)
Cluster 46 A6 NA 9-Apr-2017 10-Apr-2017 2:30 PM 11-Apr-2017 A Approved Closed

Cast in place concrete formwork inspection for RC Column neck axis


376 KHEP-CI-0376
(A,B,C,D,E,F,G,H,J,K,L,M,N)
Cluster 04 A6 NA 9-Apr-2017 10-Apr-2017 2:30 PM 11-Apr-2017 A Approved Closed

Concrete sampling, testing and placement inspection for RC Column


377 KHEP-CI-0377
neck (A,B,C,D,E)
Cluster 68 B2 NA 9-Apr-2017 10-Apr-2017 9:30 AM 10-Apr-2017 A Approved Closed

Concrete sampling, testing and placement inspection for RC Column


378 KHEP-CI-0378
neck (A,B,C,D,E)
Cluster 08 B2 NA 9-Apr-2017 10-Apr-2017 9:30 AM 10-Apr-2017 A Approved Closed

Concrete sampling, testing and placement inspection for RC Column


379 KHEP-CI-0379
neck (A,B,C,D,E)
Cluster 17 B2 NA 9-Apr-2017 10-Apr-2017 9:30 AM 10-Apr-2017 A Approved Closed

Concrete sampling, testing and placement inspection for RC Column


380 KHEP-CI-0380
neck axis (A,B,C,D,E,F,G,H,J,K,L,M,N)
Cluster 81 A6 NA 9-Apr-2017 10-Apr-2017 9:30 AM 10-Apr-2017 A Approved Closed

Concrete sampling, testing and placement inspection for RC footing


381 KHEP-CI-0381
axis (A,B,C,D,E,)
Cluster 46 A6 NA 9-Apr-2017 10-Apr-2017 9:30 AM 10-Apr-2017 A Approved Closed

Second Coat, Damproofing installation inspection and final inspection


382 KHEP-CI-0382
for foundation & neck column axis (A,B,C,D,E,F,G,H,J,K,L,M,N)
Cluster 01 A6 NA 9-Apr-2017 10-Apr-2017 3:30 PM 11-Apr-2017 A Approved Closed

383 KHEP-CI-0383 Damproofing surface preparation for RC foundation & Column neck Cluster 02 A6 NA 9-Apr-2017 10-Apr-2017 2:30 PM 11-Apr-2017 A Approved Closed
Zone 3B / C-
384 KHEP-CI-0384 Compaction test of excavated formation level of foundation
53
NA 9-Apr-2017 10-Apr-2017 2:30 PM 12-Apr-2017 A Approved Closed

Zone 3B / C-
385 KHEP-CI-0385 Compaction test of excavated formation level of foundation
52
NA 9-Apr-2017 10-Apr-2017 2:30 PM 12-Apr-2017 A Approved Closed

Zone 1B / C-
386 KHEP-CI-0386 Compaction test of excavated formation level of foundation
19
NA 9-Apr-2017 10-Apr-2017 2:30 PM 11-Apr-2017 E Rejected Closed

Zone 1B / C-
386.1 KHEP-CI-0386-1 Compaction test of excavated formation level of foundation
19
NA 11-Apr-2017 12-Apr-2017 3:30 PM 15-Apr-2017 A Approved Closed

Zone 1B / C-
387 KHEP-CI-0387 Compaction test 1st and final layer structural fill (selected fill)
10
NA 9-Apr-2017 10-Apr-2017 2:30 PM 11-Apr-2017 A Approved Closed

Zone 1B / C-
388 KHEP-CI-0388 Compaction test 1st and final layer structural fill (selected fill)
11
NA 9-Apr-2017 10-Apr-2017 2:30 PM 11-Apr-2017 A Approved Closed

Termite control surface preparation, installation and final inspection


389 KHEP-CI-0389
for PC foundation
Cluster 71 B2 NA 10-Apr-2017 11-Apr-2017 10:30 AM 12-Apr-2017 A Approved Closed

Blinding concrete sampling, testing & placement inspection for


390 KHEP-CI-0390
Footing
Cluster 71 B2 NA 10-Apr-2017 11-Apr-2017 1:30 PM 12-Apr-2017 A Approved Closed

Termite control surface preparation, installation and final inspection


391 KHEP-CI-0391
for PC foundation
Cluster 13 B2 NA 10-Apr-2017 11-Apr-2017 10:30 AM 12-Apr-2017 A Approved Closed

Blinding concrete sampling, testing & placement inspection for


392 KHEP-CI-0392
Footing
Cluster 13 B2 NA 10-Apr-2017 11-Apr-2017 1:30 PM 12-Apr-2017 A Approved Closed

Cast in place concrete formwork inspection for RC Footing axis Approved w/


393 KHEP-CI-0393
(K,L,M,N)
Cluster 46 A6 NA 10-Apr-2017 11-Apr-2017 2:30 PM 13-Apr-2017 B comments
Closed

Installation of reinforcing steel bar, embedded item and form closure


394 KHEP-CI-0394
inspection for RC Footing axis (K,L,M,N)
Cluster 46 A6 NA 10-Apr-2017 11-Apr-2017 2:30 PM 13-Apr-2017 A Approved Closed

Installation of reinforcing steel bar, embedded item and form closure


395 KHEP-CI-0395
inspection for RC Column Neck axis (A,B,C,D,E,F,G,H,J,K,L,M,N)
Cluster 66 A6 NA 10-Apr-2017 11-Apr-2017 2:30 PM 11-Apr-2017 A Approved Closed

Cast in place concrete formwork inspection for RC Footing axis


396 KHEP-CI-0396
(A,B,C,D,E,)
Cluster 73 B2 NA 10-Apr-2017 11-Apr-2017 2:30 PM 12-Apr-2017 E Rejected Closed

Cast in place concrete formwork inspection for RC Footing axis


396.1 KHEP-CI-0396-01
(A,B,C,D,E,)
Cluster 73 B2 NA 13-Apr-2017 15-Apr-2017 2:30 PM 16-Apr-2017 A Approved Closed

Installation of reinforcing steel bar, embedded item and form closure


397 KHEP-CI-0397
inspection for RC Footing axis (A,B,C,D,E,)
Cluster 73 B2 NA 10-Apr-2017 11-Apr-2017 2:30 PM 12-Apr-2017 E Rejected Closed

Installation of reinforcing steel bar, embedded item and form closure


397.1 KHEP-CI-0397-01
inspection for RC Footing axis (A,B,C,D,E,)
Cluster 73 B2 NA 13-Apr-2017 15-Apr-2017 2:30 PM 16-Apr-2017 A Approved Closed

Cast in place concrete formwork inspection for RC Footing axis


398 KHEP-CI-0398
(A,B,C,D,E,)
Cluster 05 B2 NA 10-Apr-2017 11-Apr-2017 2:30 PM 12-Apr-2017 A Approved Closed

Installation of reinforcing steel bar, embedded item and form closure


399 KHEP-CI-399
inspection for RC Footing axis (A,B,C,D,E,)
Cluster 05 B2 NA 10-Apr-2017 11-Apr-2017 2:30 PM 12-Apr-2017 A Approved Closed

Cast in place concrete formwork inspection for RC Column Neck axis


400 KHEP-CI-400
(A,B,C,D,E,)
Cluster 14 B2 NA 10-Apr-2017 11-Apr-2017 2:30 PM 12-Apr-2017 A Approved Closed

Cast in place concrete formwork inspection for RC Column Neck axis


401 KHEP-CI-401
(A,B,C,D,E,)
Cluster 15 B2 NA 10-Apr-2017 11-Apr-2017 2:30 PM 12-Apr-2017 A Approved Closed

Concrete sampling, testing and placement inspection for RC footing


402 KHEP-CI-402
axis (A,B,C,D,E,F,G)
Cluster 45 A6 NA 10-Apr-2017 11-Apr-2017 9:30 AM 11-Apr-2017 A Approved Closed

Concrete sampling, testing and placement inspection for RC Column


403 KHEP-CI-403
neck axis (A,B,C,D,E,)
Cluster 07 B2 NA 10-Apr-2017 11-Apr-2017 9:30 AM 11-Apr-2017 A Approved Closed

Zone 3B / C- Approved w/
404 KHEP-CI-404 Compaction test 1st and final layer structural fill (selected fill)
58
NA 10-Apr-2017 11-Apr-2017 3:30 PM 12-Apr-2017 B comments
Closed

Jobsite Stcok
405 KHEP-CI-405 Soil sampling-sweet sand for sand bedding & sand caution
pile
NA 11-Apr-2017 12-Apr-2017 2:30 PM 13-Apr-2017 E Rejected Closed

Jobsite Stcok
405.1 KHEP-CI-405-01 Soil sampling-sweet sand for sand bedding & sand caution
pile
NA 16-Apr-2017 17-Apr-2017 3:30 PM 18-Apr-2017 E Rejected Closed

Soil sampling fine sand for sand bedding & sand caution (From Jobsite Stcok Approved w/
405.2 KHEP-CI-405-02
hamida est. supplier) pile
NA 2-May-2017 3-May-2017 3:00 PM 4-May-2017 B comments
Closed

Jobsite Stcok
406 KHEP-CI-406 Soil sampling-sub base materials
pile
NA 11-Apr-2017 12-Apr-2017 2:30 PM 13-Apr-2017 E Rejected Closed

Jobsite Stcok Approved w/


406.1 KHEP-CI-406-01 Soil sampling-sub base materials
pile
NA 15-Apr-2017 16-Apr-2017 3:30 PM 17-Apr-2017 B comments
Closed

Jobsite Stcok
406.2 KHEP-CI-406-02 Soil sampling-sub base materials, Grading 2
pile
NA 10-May-2017 11-May-2017 3:00 PM 13-May-2017 E Rejected Closed

Zone 2B / C-
407 KHEP-CI-407 Compaction test of excavated formation level for foundation
27
NA 11-Apr-2017 12-Apr-2017 2:30 PM 15-Apr-2017 A Approved Closed

Zone 2B / C-
408 KHEP-CI-408 Compaction test of excavated formation level for foundation
30
NA 11-Apr-2017 12-Apr-2017 2:30 PM 13-Apr-2017 E Rejected Closed

Zone 2B / C-
408.1 KHEP-CI-408-01 Compaction test of excavated formation level for foundation
30
NA 15-Apr-2017 16-Apr-2017 3:30 PM 17-Apr-2017 A Approved Closed
Zone 1B / C-
409 KHEP-CI-409 Compaction test 1st and final layer structural fill (selected fill)
12
NA 11-Apr-2017 12-Apr-2017 2:30 PM 15-Apr-2017 A Approved Closed

Zone 3B / C-
410 KHEP-CI-410 Compaction test 1st and final layer structural fill (selected fill)
51
NA 11-Apr-2017 12-Apr-2017 2:30 PM 15-Apr-2017 A Approved Closed

Zone 3B / C-
411 KHEP-CI-411 Compaction test 1st and final layer structural fill (selected fill)
52
NA 11-Apr-2017 12-Apr-2017 2:30 PM 15-Apr-2017 A Approved Closed

Termite control surface preparation, installation and final inspection


412 KHEP-CI-412
for PC foundation
Cluster 10 B2 NA 11-Apr-2017 12-Apr-2017 10:30 AM 13-Apr-2017 A Approved Closed

Blinding concrete sampling, testing & placement inspection for


413 KHEP-CI-413
Footing
Cluster 10 B2 NA 11-Apr-2017 12-Apr-2017 1:30 PM 15-Apr-2017 A Approved Closed

Termite control surface preparation, installation and final inspection


414 KHEP-CI-414
for PC foundation
Cluster 11 B2 NA 11-Apr-2017 12-Apr-2017 10:30 AM 13-Apr-2017 A Approved Closed

Blinding concrete sampling, testing & placement inspection for


415 KHEP-CI-415
Footing
Cluster 11 B2 NA 11-Apr-2017 12-Apr-2017 1:30 PM 15-Apr-2017 A Approved Closed

416 KHEP-CI-416 Damproofing surface preparation for RC foundation & Column neck Cluster 03 A6 NA 11-Apr-2017 12-Apr-2017 2:30 PM 13-Apr-2017 A Approved Closed

Concrete sampling, testing and placement inspection for RC footing


417 KHEP-CI-417
axis (A,B,C,D,E,)
Cluster 72 B2 NA 11-Apr-2017 12-Apr-2017 9:30 AM 12-Apr-2017 A Approved Closed

Zone 5A
(Road No; 04
418 KHEP-CI-418 Compaction test of 11th layer general fill
0+025-
NA 12-Apr-2017 13-Apr-2017 3:00 PM 15-Apr-2017 E Rejected Closed
0+100)
Zone 5A
(Road No; 04
418.1 KHEP-CI-418-01 Compaction test of 11th layer general fill
0+025-
NA 16-Apr-2017 17-Apr-2017 3:00 PM 18-Apr-2017 A Approved Closed
0+100)
Zone 2B / C-
419 KHEP-CI-419 Compaction test of excavated formation level for foundation
33
NA 12-Apr-2017 13-Apr-2017 3:00 PM 15-Apr-2017 A Approved Closed

Cast in place concrete formwork inspection for RC Footing axis


420 KHEP-CI-420
(A,B,C,D,E,)
Cluster 13 B2 NA 12-Apr-2017 13-Apr-2017 2:30 PM 16-Apr-2017 A Approved Closed

Installation of reinforcing steel bar, embedded item and form closure


421 KHEP-CI-421
inspection for RC Footing axis (A,B,C,D,E,)
Cluster 13 B2 NA 12-Apr-2017 13-Apr-2017 2:30 PM 16-Apr-2017 A Approved Closed

Termite control surface preparation, installation and final inspection


422 KHEP-CI-422
for PC foundation
Cluster 58 B2 NA 12-Apr-2017 13-Apr-2017 10:30 AM 15-Apr-2017 A Approved Closed

Blinding concrete sampling, testing & placement inspection for


423 KHEP-CI-423
Footing
Cluster 58 B2 NA 12-Apr-2017 13-Apr-2017 1:30 PM 15-Apr-2017 A Approved Closed

Concrete sampling, testing and placement inspection for RC Column


424 KHEP-CI-424
neck axis (A,B,C,D,E,F,G,H,J,K,L,M,N)
Cluster 04 A6 NA 12-Apr-2017 13-Apr-2017 9:30 AM 13-Apr-2017 A Approved Closed

First Coat, Damproofing Installation Inspection for RC footing &


425 KHEP-CI-425
column neck axis (A,B,C,D,E,F,G,H,J,K,L,M,N)
Cluster 02 A6 NA 12-Apr-2017 13-Apr-2017 9:30 AM 15-Apr-2017 A Approved Closed

Zone 3B / C-
426 KHEP-CI-426 Compaction test 1st and final layer structural fill (selected fill)
54
NA 12-Apr-2017 13-Apr-2017 3:00 PM 13-Apr-2017 E Rejected Closed

Zone 3B / C-
426.1 KHEP-CI-426-01 Compaction test 1st and final layer structural fill (selected fill)
54
NA 15-Apr-2017 16-Apr-2017 3:00 PM 17-Apr-2017 A Approved Closed

Concrete sampling, testing and placement inspection for RC Grad


427 KHEP-CI-427
Beam Mockup
Cluster 69 B2 NA 12-Apr-2017 13-Apr-2017 9:30 AM 13-Apr-2017 A Approved Closed

Cast in place concrete formwork inspection for RC Footing axis


428 KHEP-CI-428
(A,B,C,D,E,)
Cluster 63 B2 NA 13-Apr-2017 15-Apr-2017 2:30 PM 17-Apr-2017 A Approved Closed

Installation of reinforcing steel bar, embedded item and form closure


429 KHEP-CI-429
inspection for RC Footing axis (A,B,C,D,E,)
Cluster 63 B2 NA 13-Apr-2017 15-Apr-2017 2:30 PM 17-Apr-2017 A Approved Closed

Cast in place concrete formwork inspection for RC Footing axis


430 KHEP-CI-430
(A,B,C,D,E,)
Cluster 64 B2 NA 13-Apr-2017 15-Apr-2017 10:30 AM 16-Apr-2017 A Approved Closed

Installation of reinforcing steel bar, embedded item and form closure


431 KHEP-CI-431
inspection for RC Footing axis (A,B,C,D,E,)
Cluster 64 B2 NA 13-Apr-2017 15-Apr-2017 10:30 AM 16-Apr-2017 A Approved Closed

Installation of reinforcing steel bar, embedded item and form closure


432 KHEP-CI-432
inspection for RC Column Neck axis (A,B,C,D,E,)
Cluster 05 B2 NA 13-Apr-2017 15-Apr-2017 2:30 PM 16-Apr-2017 A Approved Closed

Second Coat, Damproofing installation inspection for Rc Footing &


433 KHEP-CI-433
neck column axis (A,B,C,D,E,F,G,H,J,K,L,M,N)
Cluster 02 A6 NA 13-Apr-2017 15-Apr-2017 10:30 AM 16-Apr-2017 A Approved Closed

Concrete sampling, testing and placement inspection for RC Column Approved w/


434 KHEP-CI-434
neck
Cluster 14 B2 NA 13-Apr-2017 15-Apr-2017 9:30 AM 16-Apr-2017 B comments
Closed

Concrete sampling, testing and placement inspection for RC Column Approved w/


435 KHEP-CI-435
neck
Cluster 15 B2 NA 13-Apr-2017 15-Apr-2017 9:30 AM 16-Apr-2017 B comments
Closed

Approved w/
436 KHEP-CI-436 Concrete sampling, testing and placement inspection for RC footing Cluster 05 B2 NA 13-Apr-2017 15-Apr-2017 9:30 AM 16-Apr-2017 B comments
Closed
Zone 1B
(ALLEY No,:
02(STA,0+02
5 to 0+117)
437 KHEP-CI-437 Compaction test 1st and final layer general fill
ALLEY No,:
NA 15-Apr-2017 16-Apr-2017 3:00 PM 18-Apr-2017 A Approved Closed
02
(STA,0+75 to
0+100)

Zone 1B
(ALLEY No,:
0(STA,0+025
to 0+100)

ALLEY No,:
438 KHEP-CI-438 Compaction test 1st and final layer general fill 12 NA 15-Apr-2017 16-Apr-2017 3:00 PM 17-Apr-2017 E Rejected Closed
(STA,0+00 to
0+50) ALLEY
No,: 13
(STA,0+00 to
0+50)

Zone 1B
(ALLEY No,:
01(STA,0+02
5 to 0+100)

ALLEY No,:
438.1 KHEP-CI-438-1 Compaction test 1st and final layer general fill 12 NA 19-Apr-2017 20-Apr-2017 3:00 PM 22-Apr-2017 E Rejected Closed
(STA,0+00 to
0+50) ALLEY
No,: 13
(STA,0+00 to
0+50)

Zone 1B
(ALLEY No,:
01(STA,0+02
5 to 0+100)

ALLEY No,:
438.2 KHEP-CI-438-2 Compaction test 1st and final layer general fill 12 NA 22-Apr-2017 23-Apr-2017 11:00 AM 24-Apr-2017 A Approved Closed
(STA,0+00 to
0+50) ALLEY
No,: 13
(STA,0+00 to
0+50)

Termite control surface preparation, installation and final inspection


439 KHEP-CI-439
for PC foundation
Cluster 12 B2 NA 15-Apr-2017 16-Apr-2017 10:30 AM 17-Apr-2017 A Approved Closed

Blinding concrete sampling, testing & placement inspection for


440 KHEP-CI-440
Footing
Cluster 12 B2 NA 15-Apr-2017 16-Apr-2017 1:30 PM 17-Apr-2017 A Approved Closed

Termite control surface preparation, installation and final inspection


441 KHEP-CI-441
for PC foundation
Cluster 51 B2 NA 15-Apr-2017 16-Apr-2017 10:30 AM 17-Apr-2017 A Approved Closed

Blinding concrete sampling, testing & placement inspection for


442 KHEP-CI-442
Footing
Cluster 51 B2 NA 15-Apr-2017 16-Apr-2017 1:30 PM 17-Apr-2017 A Approved Closed

443 KHEP-CI-443 Concrete sampling, testing and placement inspection for RC footing Cluster 73 B2 NA 15-Apr-2017 16-Apr-2017 9:30 AM 17-Apr-2017 A Approved Closed

Installation of reinforcing steel bar, embedded item and form closure


444 KHEP-CI-444
inspection for RC Column
Cluster 69 B2 NA 15-Apr-2017 16-Apr-2017 2:30 PM 17-Apr-2017 E Rejected Closed

Installation of reinforcing steel bar, embedded item and form closure


444.1 KHEP-CI-444-01
inspection for RC Column Mockup Axis (A,B,C,D,E)
Cluster 69 B2 NA 18-Apr-2017 19-Apr-2017 2:30 PM 20-Apr-2017 A Approved Closed

Zone 1B / C-
445 KHEP-CI-445 Compaction test 1st and final layer general fill(Selected fill)
19
NA 16-Apr-2017 17-Apr-2017 3:00 PM 18-Apr-2017 A Approved Closed

Zone 1B / C-
446 KHEP-CI-446 Compaction test 1st and final layer general fill(Selected fill)
20
NA 16-Apr-2017 17-Apr-2017 3:00 PM 18-Apr-2017 A Approved Closed
447 KHEP-CI-447 Survey Inspection for new bench mark As per Highlighted drwg. NA NA 16-Apr-2017 17-Apr-2017 3:00 PM 22-Apr-2017 A Approved Closed

Cast in place concrete formwork inspection for RC Column neck axis


448 KHEP-CI-448
(A,B,C,D,E,F,G,H,J,K,L,M,N)
Cluster 43 A6 NA 16-Apr-2017 17-Apr-2017 2:30 PM 19-Apr-2017 A Approved Closed

Termite control surface preparation, installation and final inspection


449 KHEP-CI-449
for PC foundation
Cluster 52 B2 NA 16-Apr-2017 17-Apr-2017 10:30 AM 19-Apr-2017 A Approved Closed

Blinding concrete sampling, testing & placement inspection for


450 KHEP-CI-450
Footing
Cluster 52 B2 NA 16-Apr-2017 17-Apr-2017 1:30 PM 20-Apr-2017 A Approved Closed

Cast in place concrete formwork inspection for RC Footing axis


451 KHEP-CI-451
(A,B,C,D,E,)
Cluster 10 B2 NA 16-Apr-2017 17-Apr-2017 2:30 PM 18-Apr-2017 A Approved Closed

Installation of reinforcing steel bar, embedded item and form closure


452 KHEP-CI-452
inspection for RC Footing axis (A,B,C,D,E,)
Cluster 10 B2 NA 16-Apr-2017 17-Apr-2017 2:30 PM 17-Apr-2017 A Approved Closed

Installation of reinforcing steel bar, embedded item and form closure


453 KHEP-CI-453
inspection for RC Column Neck axis (A,B,C,D,E,)
Cluster 72 B2 NA 16-Apr-2017 17-Apr-2017 2:30 PM 18-Apr-2017 A Approved Closed

Installation of reinforcing steel bar, embedded item and form closure


454 KHEP-CI-454
inspection for RC Column Neck axis (A,B,C,D,E,)
Cluster 73 B2 NA 16-Apr-2017 17-Apr-2017 2:30 PM 18-Apr-2017 A Approved Closed

Installation of reinforcing steel bar, embedded item and form closure


455 KHEP-CI-455
inspection for RC Column Neck axis (A,B,C,D,E,)
Cluster 13 B2 NA 16-Apr-2017 17-Apr-2017 2:30 PM 18-Apr-2017 A Approved Closed

First Coat, Damproofing Installation Inspection for RC footing &


456 KHEP-CI-456
column neck axis (A,B,C,D,E,F,G,H,J,K,L,M,N)
Cluster 03 A6 NA 16-Apr-2017 17-Apr-2017 2:30 PM 18-Apr-2017 E Rejected Closed

First Coat, Damproofing Installation Inspection for RC footing &


456.1 KHEP-CI-456-1
column neck axis (A,B,C,D,E,F,G,H,J,K,L,M,N)
Cluster 03 A6 NA 20-Apr-2017 22-Apr-2017 2:30 PM 23-Apr-2017 A Approved Closed

457 KHEP-CI-457 Damproofing surface preparation for RC foundation & Column neck Cluster 81 A6 NA 16-Apr-2017 17-Apr-2017 2:30 PM 19-Apr-2017 A Approved Closed

458 KHEP-CI-458 Concrete sampling, testing and placement inspection for RC footing Cluster 13 B2 NA 16-Apr-2017 17-Apr-2017 9:30 AM 17-Apr-2017 A Approved Closed

Concrete sampling, testing and placement inspection for RC footing


459 KHEP-CI-459
axis (F,G,H,J,K,L,M,N)
Cluster 46 A6 NA 16-Apr-2017 17-Apr-2017 9:30 AM 17-Apr-2017 A Approved Closed

Zone 2B / C-
460 KHEP-CI-460 Compaction test 1st and final layer general fill(Selected fill)
27
NA 17-Apr-2017 18-Apr-2017 2:00 PM 19-Apr-2017 A Approved Closed

Zone 2B / C-
461 KHEP-CI-461 Compaction test 1st and final layer general fill(Selected fill)
33
NA 17-Apr-2017 18-Apr-2017 2:00 PM 20-Apr-2017 A Approved Closed

462 KHEP-CI-462 Cast in place concrete formwork inspection for RC Column neck Cluster 05 B2 NA 17-Apr-2017 18-Apr-2017 2:30 PM 19-Apr-2017 A Approved Closed

463 KHEP-CI-463 Cast in place concrete formwork inspection for RC Column neck Cluster 11 B2 NA 17-Apr-2017 18-Apr-2017 2:30 PM 19-Apr-2017 A Approved Closed

Installation of reinforcing steel bar, embedded item and form closure


464 KHEP-CI-464
inspection for RC Column Neck
Cluster 11 B2 NA 17-Apr-2017 18-Apr-2017 2:30 PM 19-Apr-2017 A Approved Closed

Termite control surface preparation, installation and final inspection


465 KHEP-CI-465
for PC foundation
Cluster 54 B2 NA 17-Apr-2017 18-Apr-2017 10:30 AM 19-Apr-2017 A Approved Closed

Blinding concrete sampling, testing & placement inspection for


466 KHEP-CI-466
Footing
Cluster 54 B2 NA 17-Apr-2017 18-Apr-2017 1:30 PM 20-Apr-2017 A Approved Closed

Second Coat,Damproofing Intallation For RC Footing & Column Neck


467 KHEP-CI-467
axis (A,B,C,D,E,F,G,H,J,K,L,M,N)
Cluster 03 A6 NA 17-Apr-2017 18-Apr-2017 2:30 PM 19-Apr-2017 E Rejected Closed

Second Coat,Damproofing Intallation For RC Footing & Column Neck


467-1 KHEP-CI-467-01
axis (A,B,C,D,E,F,G,H,J,K,L,M,N)
Cluster 03 A6 NA 22-Apr-2017 23-Apr-2017 2:30 PM 24-Apr-2017 A Approved Closed

468 KHEP-CI-468 Concrete sampling, testing and placement inspection for RC Footing Cluster 64 B2 NA 17-Apr-2017 18-Apr-2017 9:30 AM 19-Apr-2017 A Approved Closed
Zone 1B
(ALLEY No,:
02(STA,0+02
5 to 0+117)
469 KHEP-CI-469 Compaction test 1nd layer general fill
ALLEY No,:
NA 17-Apr-2017 18-Apr-2017 3:00 PM 20-Apr-2017 A Approved Closed
02
(STA,0+75 to
0+100)

Cast in place concrete formwork inspection for RC Column neck axis


470 KHEP-CI-470
(A,B,C,D,E,F,G,H,J,K,L,M,N)
Cluster 66 A6 NA 17-Apr-2017 18-Apr-2017 2:30 PM 20-Apr-2017 A Approved Closed

471 KHEP-CI-471 Cast in place concrete formwork inspection for RC Footing Cluster 71 B2 NA 17-Apr-2017 18-Apr-2017 2:30 PM 19-Apr-2017 A Approved Closed

Installation of reinforcing steel bar, embedded item and form closure


472 KHEP-CI-472
inspection for RC Footing
Cluster 71 B2 NA 17-Apr-2017 18-Apr-2017 2:30 PM 19-Apr-2017 A Approved Closed

Road
No:01(sta
473 KHEP-CI-473 Compaction test and Formattion existing level
0+00 to
NA 17-Apr-2017 18-Apr-2017 2:00 PM 20-Apr-2017 A Approved Closed
0+200)
Road
No:05(sta
474 KHEP-CI-474 Compaction test and Formattion existing level
0+00 to
NA 17-Apr-2017 18-Apr-2017 2:00 PM 20-Apr-2017 A Approved Closed
0+200)
Termite control surface preparation, installation and final inspection
475 KHEP-CI-475
for PC foundation
Cluster 19 B2 NA 18-Apr-2017 19-Apr-2017 10:30 AM 20-Apr-2017 A Approved Closed

Blinding concrete sampling, testing & placement inspection for


476 KHEP-CI-476
Footing
Cluster 19 B2 NA 18-Apr-2017 19-Apr-2017 1:30 PM 20-Apr-2017 A Approved Closed

Termite control surface preparation, installation and final inspection


477 KHEP-CI-477
for PC foundation
Cluster 20 B2 NA 18-Apr-2017 19-Apr-2017 10:30 AM 20-Apr-2017 A Approved Closed

Blinding concrete sampling, testing & placement inspection for


478 KHEP-CI-478
Footing
Cluster 20 B2 NA 18-Apr-2017 19-Apr-2017 1:30 PM 20-Apr-2017 A Approved Closed

479 KHEP-CI-479 Cast in place concrete formwork inspection for RC Footing Cluster 12 B2 NA 18-Apr-2017 19-Apr-2017 2:30 PM 20-Apr-2017 A Approved Closed

Installation of reinforcing steel bar, embedded item and form closure


480 KHEP-CI-480
inspection for RC Footing
Cluster 12 B2 NA 18-Apr-2017 19-Apr-2017 2:30 PM 20-Apr-2017 A Approved Closed

481 KHEP-CI-481 Cast in place concrete formwork inspection for RC Footing Cluster 75 B2 NA 18-Apr-2017 19-Apr-2017 2:30 PM 20-Apr-2017 A Approved Closed

Installation of reinforcing steel bar, embedded item and form closure


482 KHEP-CI-482
inspection for RC Footing
Cluster 75 B2 NA 18-Apr-2017 19-Apr-2017 2:30 PM 20-Apr-2017 A Approved Closed

483 KHEP-CI-483 Cast in place concrete formwork inspection for RC Column Neck Cluster 13 B2 NA 18-Apr-2017 19-Apr-2017 2:30 PM 20-Apr-2017 A Approved Closed

484 KHEP-CI-484 Concrete sampling, testing and placement inspection for RC footing Cluster 63 B2 NA 18-Apr-2017 19-Apr-2017 9:30 AM 20-Apr-2017 A Approved Closed

485 KHEP-CI-485 Concrete sampling, testing and placement inspection for RC footing Cluster 10 B2 NA 18-Apr-2017 19-Apr-2017 9:30 AM 20-Apr-2017 A Approved Closed

Zone 2B / C-
486 KHEP-CI-486 Compaction test 1st and final layer general fill(Selected fill)
30
NA 18-Apr-2017 19-Apr-2017 3:30 PM 20-Apr-2017 A Approved Closed

Zone 2B / C-
487 KHEP-CI-487 Compaction test excavated formation level for foundation
34
NA 18-Apr-2017 19-Apr-2017 3:30 PM 20-Apr-2017 A Approved Closed

Installation of reinforcing steel bar, embedded item and form closure


488 KHEP-CI-488
inspection for RC Column Neck
Cluster 10 B2 NA 18-Apr-2017 19-Apr-2017 2:30 PM 22-Apr-2017 A Approved Closed

Zone 1A / C-
489 KHEP-CI-489 Compaction test 1st layer Around Footing general fill
01
NA 18-Apr-2017 19-Apr-2017 10:00 AM 20-Apr-2017 E Rejected Closed

Zone 1A, Approved w/


489.1 KHEP-CI-489-01 Compaction test Around Footing general fill
Cluster 1
NA 28-Jun-2017 29-Jun-2017 2:00 PM 29-Jun-2017 B comments
Closed

Zone 1A / C-
490 KHEP-CI-490 Compaction test 1st layer Around Footing general fill
02
NA 18-Apr-2017 19-Apr-2017 10:00 AM 20-Apr-2017 E Rejected Closed

Zone 1A, Approved w/


490.1 KHEP-CI-490-01 Compaction test Around Footing general fill
Cluster 2
NA 28-Jun-2017 29-Jun-2017 2:00 PM 29-Jun-2017 B comments
Closed

491 KHEP-CI-491 Cast in place concrete formwork inspection for RC Footing Cluster 58 B2 NA 19-Apr-2017 20-Apr-2017 2:30 PM 22-Apr-2017 E Rejected Closed

491.1 KHEP-CI-491-01 Cast in place concrete formwork inspection for RC Footing Cluster 58 B2 NA 22-Apr-2017 23-Apr-2017 10:30 AM 24-Apr-2017 A Approved Closed

Installation of reinforcing steel bar, embedded item and form closure


492 KHEP-CI-492
inspection for RC Footing
Cluster 58 B2 NA 19-Apr-2017 20-Apr-2017 2:30 PM 22-Apr-2017 E Rejected Closed

Installation of reinforcing steel bar, embedded item and form closure


492-1 KHEP-CI-492-1
inspection for RC Footing
Cluster 58 B2 NA 22-Apr-2017 23-Apr-2017 10:30 AM 24-Apr-2017 A Approved Closed

Installation of reinforcing steel bar, embedded item and form closure


493 KHEP-CI-493
inspection for RC Column Neck
Cluster 65 B2 NA 19-Apr-2017 20-Apr-2017 2:30 PM 22-Apr-2017 A Approved Closed

494 KHEP-CI-494 Cast in place concrete formwork inspection for RC Column neck Cluster 72 B2 NA 19-Apr-2017 20-Apr-2017 11:00 AM 22-Apr-2017 A Approved Closed

495 KHEP-CI-495 Cast in place concrete formwork inspection for RC Column neck Cluster 73 B2 NA 19-Apr-2017 20-Apr-2017 10:30 AM 22-Apr-2017 A Approved Closed

Termite control surface preparation, installation and final inspection


496 KHEP-CI-496
for PC foundation
Cluster 27 B2 NA 19-Apr-2017 20-Apr-2017 10:30 AM 22-Apr-2017 A Approved Closed

Blinding concrete sampling, testing & placement inspection for


497 KHEP-CI-497
Footing
Cluster 27 B2 NA 19-Apr-2017 20-Apr-2017 1:30 PM 22-Apr-2017 A Approved Closed

Termite control surface preparation, installation and final inspection


498 KHEP-CI-498
for PC foundation
Cluster 33 B2 NA 19-Apr-2017 20-Apr-2017 10:30 AM 22-Apr-2017 A Approved Closed

Blinding concrete sampling, testing & placement inspection for


499 KHEP-CI-499
Footing
Cluster 33 B2 NA 19-Apr-2017 20-Apr-2017 1:30 PM 22-Apr-2017 A Approved Closed

500 KHEP-CI-500 Damproofing surface preparation for RC foundation & Column neck Cluster 17 B2 NA 19-Apr-2017 20-Apr-2017 10:30 AM 22-Apr-2017 A Approved Closed

501 KHEP-CI-501 Damproofing surface preparation for RC foundation & Column neck Cluster 07 B2 NA 19-Apr-2017 20-Apr-2017 10:30 AM 22-Apr-2017 A Approved Closed
502 KHEP-CI-502 Damproofing surface preparation for RC foundation & Column neck Cluster 08 B2 NA 19-Apr-2017 20-Apr-2017 10:30 AM 22-Apr-2017 A Approved Closed

503 KHEP-CI-503 Concrete sampling, testing and placement inspection for RC footing Cluster 71 B2 NA 19-Apr-2017 20-Apr-2017 9:30 AM 20-Apr-2017 A Approved Closed

Concrete sampling, testing and placement inspection for RC Column Approved w/


504 KHEP-CI-504
neck
Cluster 05 B2 NA 19-Apr-2017 20-Apr-2017 9:30 AM 22-Apr-2017 B comments
Closed

Approved w/
505 KHEP-CI-505 Concrete sampling, testing and placement inspection for RC footing Cluster 11 B2 NA 19-Apr-2017 20-Apr-2017 9:30 AM 22-Apr-2017 B comments
Closed

Zone 2B / C-
506 KHEP-CI-506 Compaction test excavated formation level for foundation
35
NA 19-Apr-2017 20-Apr-2017 3:00 PM 22-Apr-2017 E Rejected Closed

Zone 2B / C-
506-1 KHEP-CI-506-01 Compaction test excavated formation level bottom of foundation
35
NA 22-Apr-2017 23-Apr-2017 11:00 AM 24-Apr-2017 E Rejected Closed

Zone 2B / C-
506-2 KHEP-CI-506-02 Compaction test excavated formation level bottom of foundation
35
NA 25-Apr-2017 26-Apr-2017 11:00 AM 27-Apr-2017 E Rejected Closed

Zone 2B / C-
506-3 KHEP-CI-506-03 Compaction test excavated formation level bottom of foundation
35
NA 29-Apr-2017 30-Apr-2017 2:00 PM 2-May-2017 A Approved Closed

Installation of reinforcing steel bar, embedded item and form closure


507 KHEP-CI-507
inspection for RC Column Neck
Cluster 11 B2 NA 19-Apr-2017 20-Apr-2017 10:30 AM 22-Apr-2017 A Approved Closed

508 KHEP-CI-508 Damproofing surface preparation for RC foundation & Column neck Cluster 15 B2 NA 20-Apr-2017 22-Apr-2017 2:30 PM 22-Apr-2017 A Approved Closed

509 KHEP-CI-509 Damproofing surface preparation for RC foundation & Column neck Cluster 05 B2 NA 20-Apr-2017 22-Apr-2017 2:30 PM 24-Apr-2017 A Approved Closed

Termite control surface preparation, installation and final inspection


510 KHEP-CI-510
for PC foundation
Cluster30 B2 NA 20-Apr-2017 22-Apr-2017 10:30 AM 23-Apr-2017 A Approved Closed

Blinding concrete sampling, testing & placement inspection for


511 KHEP-CI-511
Footing
Cluster 30 B2 NA 20-Apr-2017 22-Apr-2017 1:30 PM 22-Apr-2017 A Approved Closed

512 KHEP-CI-512 Cast in place concrete formwork inspection for RC Column neck Cluster 19 B2 NA 20-Apr-2017 22-Apr-2017 2:30 PM 22-Apr-2017 A Approved Closed

Installation of reinforcing steel bar, embedded item and form closure


513 KHEP-CI-513
inspection for RC Footing
Cluster 19 B2 NA 20-Apr-2017 22-Apr-2017 2:30 PM 22-Apr-2017 A Approved Closed

514 KHEP-CI-514 Cast in place concrete formwork inspection for RC Footing Cluster 20 B2 NA 20-Apr-2017 22-Apr-2017 2:30 PM 24-Apr-2017 A Approved Closed

Installation of reinforcing steel bar, embedded item and form closure


515 KHEP-CI-515
inspection for RC Footing
Cluster 20 B2 NA 20-Apr-2017 22-Apr-2017 2:30 PM 24-Apr-2017 A Approved Closed

516 KHEP-CI-516 Cast in place concrete formwork inspection for RC Footing Cluster 54 B2 NA 20-Apr-2017 22-Apr-2017 2:30 PM 24-Apr-2017 A Approved Closed

Installation of reinforcing steel bar, embedded item and form closure


517 KHEP-CI-517
inspection for RC Footing
Cluster 54 B2 NA 20-Apr-2017 22-Apr-2017 2:30 PM 24-Apr-2017 A Approved Closed

518 KHEP-CI-518 Cast in place concrete formwork inspection for RC Column neck Cluster 10 B2 NA 20-Apr-2017 22-Apr-2017 2:30 PM 24-Apr-2017 A Approved Closed

Concrete sampling, testing and placement inspection for RC Column


519 KHEP-CI-519
neck
Cluster 66 A6 NA 20-Apr-2017 22-Apr-2017 9:30 AM 22-Apr-2017 A Approved Closed

Concrete sampling, testing and placement inspection for RC Column


520 KHEP-CI-520
neck
Cluster 13 B2 NA 20-Apr-2017 22-Apr-2017 9:30 AM 22-Apr-2017 A Approved Closed

Concrete sampling, testing and placement inspection for RC Column Approved w/


521 KHEP-CI-521
neck
Cluster 43 A6 NA 20-Apr-2017 22-Apr-2017 9:30 AM 22-Apr-2017 B comments
Closed

Approved w/
522 KHEP-CI-522 Concrete sampling, testing and placement inspection for RC footing Cluster 12 B2 NA 20-Apr-2017 22-Apr-2017 9:30 AM 22-Apr-2017 B comments
Closed

523 KHEP-CI-523 Cast in place concrete formwork inspection for RC Column neck Cluster 69 B2 NA 20-Apr-2017 22-Apr-2017 2:30 PM 22-Apr-2017 A Approved Closed

Zone 2B / C-
524 KHEP-CI-524 Compaction test 1st and final layer Sturctural fill(Selected fill)
34
NA 20-Apr-2017 22-Apr-2017 3:30 PM 23-Apr-2017 A Approved Closed

Zone 3B / C-
525 KHEP-CI-525 Compaction test Excavated Faomation Level of Foudation
61
NA 20-Apr-2017 22-Apr-2017 3:30 PM 23-Apr-2017 A Approved Closed

Zone 3B / C-
526 KHEP-CI-526 Compaction test Excavated Faomation Level of Foudation
48
NA 20-Apr-2017 22-Apr-2017 3:30 PM 23-Apr-2017 E Rejected Closed

526.1 KHEP-CI-526-01 Compaction test Excavated Formation Level bottom of Foudation Zone 3B, C48 NA 11-May-2017 13-May-2017 2:00 PM 14-May-2017 A Approved Closed

First Coat, Damproofing Installation Inspection for RC footing &


527 KHEP-CI-527
column neck axis (A,B,C,D,E,F,G,H,J,K,L,M,N)
Cluster 81 A6 NA 20-Apr-2017 22-Apr-2017 2:30 PM 23-Apr-2017 A Approved Closed

528 KHEP-CI-528 Damproofing surface preparation for RC foundation & Column neck Cluster 14 B2 NA 20-Apr-2017 22-Apr-2017 2:30 PM 23-Apr-2017 A Approved Closed

529 KHEP-CI-529 Concrete sampling, testing and placement inspection for RC footing Cluster 75 B2 NA 22-Apr-2017 23-Apr-2017 9:30 AM 23-Apr-2017 A Approved Closed

Concrete sampling, testing and placement inspection for RC Column


530 KHEP-CI-530
neck Mockup
Cluster 69 B2 NA 22-Apr-2017 23-Apr-2017 9:30 AM 23-Apr-2017 A Approved Closed
Second Coat,Damproofing Intallation For RC Footing & Column Neck
531 KHEP-CI-531
axis (A,B,C,D,E,F,G,H,J,K,L,M,N)
Cluster 81 A6 NA 22-Apr-2017 23-Apr-2017 2:30 PM 24-Apr-2017 A Approved Closed

Road
No:01(sta
532 KHEP-CI-532 Compaction test 1st layer general fill
0+100 to
NA 22-Apr-2017 23-Apr-2017 2:30 PM 24-Apr-2017 A Approved Closed
0+223)
Installation of reinforcing steel bar, embedded item and form closure
533 KHEP-CI-533
inspection for RC Column Neck axis (G,H,J,K,L,M,N)
Cluster 46 A6 NA 22-Apr-2017 23-Apr-2017 2:30 PM 24-Apr-2017 A Approved Closed

Installation of reinforcing steel bar, embedded item and form closure


534 KHEP-CI-534
inspection for RC Column Neck
Cluster 12 B2 NA 22-Apr-2017 23-Apr-2017 2:30 PM 24-Apr-2017 A Approved Closed

535 KHEP-CI-535 Cast in place concrete formwork inspection for RC Footing Cluster 52 B2 NA 23-Apr-2017 24-Apr-2017 2:30 PM 26-Apr-2017 A Approved Closed

Installation of reinforcing steel bar, embedded item and form closure Approved w/
536 KHEP-CI-536
inspection for RC Footing
Cluster 52 B2 NA 23-Apr-2017 24-Apr-2017 2:30 PM 25-Apr-2017 B comments
Closed

537 KHEP-CI-537 Cast in place concrete formwork inspection for RC Footing Cluster 27 B2 NA 23-Apr-2017 24-Apr-2017 2:30 PM 25-Apr-2017 A Approved Closed

Installation of reinforcing steel bar, embedded item and form closure


538 KHEP-CI-538
inspection for RC Footing
Cluster 27 B2 NA 23-Apr-2017 24-Apr-2017 2:30 PM 25-Apr-2017 A Approved Closed

539 KHEP-CI-539 Cast in place concrete formwork inspection for RC Column neck Cluster 11 B2 NA 23-Apr-2017 24-Apr-2017 2:30 PM 26-Apr-2017 A Approved Closed

Installation of reinforcing steel bar, embedded item and form closure


540 KHEP-CI-540
inspection for RC Column Neck axis (A,B,C,D,E,F)
Cluster 46 NA 23-Apr-2017 24-Apr-2017 2:30 PM 25-Apr-2017 A Approved Closed

Termite control surface preparation, installation and final inspection


541 KHEP-CI-541
for PC foundation
Cluster 34 B2 NA 23-Apr-2017 24-Apr-2017 10:30 AM 25-Apr-2017 A Approved Closed

Blinding concrete sampling, testing & placement inspection for


542 KHEP-CI-542
Footing
Cluster 34 B2 NA 23-Apr-2017 24-Apr-2017 1:30 PM 26-Apr-2017 A Approved Closed

Installation of reinforcing steel bar, embedded item and form closure


543 KHEP-CI-543
inspection for RC Column Neck
Cluster 19 B2 NA 23-Apr-2017 24-Apr-2017 2:30 PM 25-Apr-2017 A Approved Closed

544 KHEP-CI-544 Concrete sampling, testing and placement inspection for RC footing Cluster 58 B2 NA 23-Apr-2017 24-Apr-2017 9:30 AM 24-Apr-2017 A Approved Closed

545 KHEP-CI-545 Concrete sampling, testing and placement inspection for RC footing Cluster 19 B2 NA 23-Apr-2017 24-Apr-2017 9:30 AM 24-Apr-2017 A Approved Closed

Concrete sampling, testing and placement inspection for RC Column


546 KHEP-CI-546
neck
Cluster 72 B2 NA 23-Apr-2017 24-Apr-2017 9:30 AM 24-Apr-2017 A Approved Closed

Zone 3B / C-
547 KHEP-CI-547 Compaction test 1st and final layer general fill(Selected fill)
61
NA 23-Apr-2017 24-Apr-2017 3:00 PM 25-Apr-2017 E Rejected Closed

Zone 3B / C-
547.1 KHEP-CI-547-01 Compaction test 1st and final layer general fill(Selected fill)
61
NA 26-Apr-2017 27-Apr-2017 2:00 PM 29-Apr-2017 A Approved Closed
Zone 1B
(ALLEY No,:
02(STA,0+02
5 to 0+117)
548 KHEP-CI-548 Compaction test 3rd layer general fill
ALLEY No,:
NA 23-Apr-2017 24-Apr-2017 3:00 PM 25-Apr-2017 A Approved Closed
11
(STA,0+75 to
0+100)

Zone 1B
(ALLEY No,:
01(STA,0+10
0 to 0+193)
549 KHEP-CI-549 Compaction test & formation existing level
ALLEY No,:
NA 23-Apr-2017 24-Apr-2017 3:00 PM 25-Apr-2017 E Rejected Closed
11
(STA,0+000
to 0+075)

Zone 1B
(ALLEY No,:
01(STA,0+10
0 to 0+193)
549.1 KHEP-CI-549-01 Compaction test & formation existing level
ALLEY No,:
NA 26-Apr-2017 27-Apr-2017 2:00 PM 29-Apr-2017 E Rejected Closed
11
(STA,0+000
to 0+075)
Zone 1B
(ALLEY No,:
01(STA,0+10
0 to 0+193)
Compaction test & formation existing level (excluding road 1
549.2 KHEP-CI-549-02
intersection ALLEY No,:
NA 29-Apr-2017 30-Apr-2017 2:00 PM 1-May-2017 A Approved Closed
11
(STA,0+000
to 0+075)

First Coat, Damproofing Installation Inspection for RC footing &


550 KHEP-CI-550
column neck
Cluster 07 B2 NA 24-Apr-2017 25-Apr-2017 2:30 PM 25-Apr-2017 A Approved Closed

First Coat, Damproofing Installation Inspection for RC footing &


551 KHEP-CI-551
column neck
Cluster 08 B2 NA 24-Apr-2017 25-Apr-2017 2:30 PM 26-Apr-2017 A Approved Closed

First Coat, Damproofing Installation Inspection for RC footing &


552 KHEP-CI-552
column neck
Cluster 17 B2 NA 24-Apr-2017 25-Apr-2017 2:30 PM 26-Apr-2017 A Approved Closed

Concrete sampling, testing and placement inspection for RC Column


553 KHEP-CI-553
neck
Cluster 73 B2 NA 24-Apr-2017 25-Apr-2017 9:30 AM 25-Apr-2017 A Approved Closed

554 KHEP-CI-554 Concrete sampling, testing and placement inspection for RC footing Cluster 20 B2 NA 24-Apr-2017 25-Apr-2017 9:30 AM 25-Apr-2017 A Approved Closed

555 KHEP-CI-555 Cast in place concrete formwork inspection for RC Footing Cluster 51 B2 NA 24-Apr-2017 25-Apr-2017 2:30 PM 27-Apr-2017 A Approved Closed

Installation of reinforcing steel bar, embedded item and form closure


556 KHEP-CI-556
inspection for RC Footing
Cluster 51 B2 NA 24-Apr-2017 25-Apr-2017 2:30 PM 27-Apr-2017 A Approved Closed

557 KHEP-CI-557 Cast in place concrete formwork inspection for RC Footing Cluster 33 B2 NA 24-Apr-2017 25-Apr-2017 2:30 PM 26-Apr-2017 A Approved Closed

Installation of reinforcing steel bar, embedded item and form closure


558 KHEP-CI-558
inspection for RC Footing
Cluster 33 B2 NA 24-Apr-2017 25-Apr-2017 2:30 PM 26-Apr-2017 A Approved Closed

Installation of reinforcing steel bar, embedded item and form closure


559 KHEP-CI-559
inspection for RC Column Neck
Cluster 63 B2 NA 24-Apr-2017 25-Apr-2017 2:30 PM 26-Apr-2017 A Approved Closed

Road
No:05(sta
560 KHEP-CI-560 Compaction test 2nd layer general fill
0+150 to
NA 24-Apr-2017 25-Apr-2017 3:00 PM 26-Apr-2017 E Rejected Closed
0+223)
Road
No:05(sta
560.1 KHEP-CI-560-1 Compaction test 2nd layer general fill
0+150 to
NA 27-Apr-2017 29-Apr-2017 3:00 PM 30-Apr-2017 A Approved Closed
0+223)
Approved w/
561 KHEP-CI-561 damproofing surface preparation for RC foundation & Column neck Cluster 04 A6 NA 24-Apr-2017 25-Apr-2017 2:30 PM 26-Apr-2017 B comments
Closed

Dam proofing surface preparation for RC foundation & Column neck


561.1 KHEP-CI-561-01
for Grid Line (A & B)
Cluster 04 A6 NA 21-May-2017 22-May-2017 2:30 PM 23-May-2017 E Rejected Closed

Dam proofing surface preparation for RC foundation & Column neck


561.2 KHEP-CI-561-02
for Grid Line (A & B)
Cluster 04 A6 NA 27-May-2017 28-May-2017 8:30 AM 28-May-2017 E Rejected Closed

Dam proofing surface preparation for RC foundation & Column neck


561.3 KHEP-CI-561-03
for Grid Line (A & B)
Cluster 04 A6 NA 30-May-2017 31-May-2017 8:30 AM 31-May-2017 A Approved Closed

562 KHEP-CI-562 Second Coat,Damproofing Intallation For RC Footing & Column Neck Cluster 07 B2 NA 25-Apr-2017 26-Apr-2017 10:00 AM 27-Apr-2017 A Approved Closed

563 KHEP-CI-563 Second Coat,Damproofing Intallation For RC Footing & Column Neck Cluster 08 B2 NA 25-Apr-2017 26-Apr-2017 10:00 AM 27-Apr-2017 A Approved Closed

564 KHEP-CI-564 Second Coat,Damproofing Intallation For RC Footing & Column Neck Cluster 17 B2 NA 25-Apr-2017 26-Apr-2017 10:00 AM 27-Apr-2017 A Approved Closed

First Coat, Damproofing Installation Inspection for RC footing &


565 KHEP-CI-565
column neck
Cluster 14 B2 NA 25-Apr-2017 26-Apr-2017 10:30 AM 27-Apr-2017 A Approved Closed

First Coat, Damproofing Installation Inspection for RC footing &


566 KHEP-CI-566
column neck
Cluster 15 B2 NA 25-Apr-2017 26-Apr-2017 10:30 AM 27-Apr-2017 A Approved Closed

First Coat, Damproofing Installation Inspection for RC footing &


567 KHEP-CI-567
column neck
Cluster 05 B2 NA 25-Apr-2017 26-Apr-2017 10:30 AM 27-Apr-2017 A Approved Closed

568 KHEP-CI-568 Concrete sampling, testing and placement inspection for RC footing Cluster 54 B2 NA 25-Apr-2017 26-Apr-2017 9:30 AM 26-Apr-2017 A Approved Closed

Concrete sampling, testing and placement inspection for RC Column


569 KHEP-CI-569
neck
Cluster 10 B2 NA 25-Apr-2017 26-Apr-2017 9:30 AM 26-Apr-2017 A Approved Closed

570 KHEP-CI-570 Concrete sampling, testing and placement inspection for RC footing Cluster 27 B2 NA 25-Apr-2017 26-Apr-2017 9:30 AM 26-Apr-2017 A Approved Closed

571 KHEP-CI-571 Cast in place concrete formwork inspection for RC Footing Cluster 34 B2 NA 25-Apr-2017 26-Apr-2017 2:30 PM 27-Apr-2017 E Rejected Closed

571.1 KHEP-CI-571-01 Cast in place concrete formwork inspection for RC Footing Cluster 34 B2 NA 29-Apr-2017 30-Apr-2017 2:30 PM 1-May-2017 A Approved Closed
Installation of reinforcing steel bar, embedded item and form closure
572 KHEP-CI-572
inspection for RC Footing
Cluster 34 B2 NA 25-Apr-2017 26-Apr-2017 2:30 PM 27-Apr-2017 E Rejected Closed

Installation of reinforcing steel bar, embedded item and form closure


572.1 KHEP-CI-572-01
inspection for RC Footing
Cluster 34 B2 NA 29-Apr-2017 30-Apr-2017 2:30 PM 1-May-2017 A Approved Closed

Cast in place concrete formwork inspection for RC Column neck axis Approved w/
573 KHEP-CI-573
(A,B,C,D,E,F,G,H,J,K,L,M,N)
Cluster 44 A6 NA 25-Apr-2017 26-Apr-2017 3:00 PM 29-Apr-2017 B comments
Closed

574 KHEP-CI-574 Cast in place concrete formwork inspection for RC Column neck Cluster 12 B2 NA 25-Apr-2017 26-Apr-2017 3:00 PM 27-Apr-2017 A Approved Closed

Installation of reinforcing steel bar, embedded item and form closure


575 KHEP-CI-575
inspection for RC Column Neck
Cluster 64 B2 NA 25-Apr-2017 26-Apr-2017 2:30 PM 27-Apr-2017 A Approved Closed

576 KHEP-CI-576 damproofing surface preparation for RC foundation & Column neck Cluster 68 B2 NA 25-Apr-2017 26-Apr-2017 2:30 PM 27-Apr-2017 A Approved Closed

Zone 1B
Alley 02
(sta,0+050 to
577 KHEP-CI-577 Compaction test 4th layer general fill 0+117) NA 25-Apr-2017 26-Apr-2017 3:00 PM 29-Apr-2017 E Rejected Closed
Alley 11
(sta,0+075 to
0+100)
Zone 1B
Alley 02
(sta,0+050 to
577.1 KHEP-CI-577-01 Compaction test 4th layer general fill 0+117) NA 30-Apr-2017 1-May-2017 3:00 PM 3-May-2017 A Approved Closed
Alley 11
(sta,0+075 to
0+100)
Cast in place concrete formwork inspection for RC Stair (first flight) Approved w/
578 KHEP-CI-578
Mockup
Cluster 69 B2 NA 25-Apr-2017 26-Apr-2017 2:30 PM 29-Apr-2017 B comments
Closed

Zone 2B
Alley 14
579 KHEP-CI-579 Compaction test & formation existing level (sta,0+000 to NA 25-Apr-2017 26-Apr-2017 3:00 PM 26-Apr-2017 A Approved Closed
0+108)

Zone 2B
Alley 06
580 KHEP-CI-580 Compaction test & formation existing level
(sta,0+000 to
NA 25-Apr-2017 26-Apr-2017 3:00 PM 26-Apr-2017 A Approved Closed
0+155)
Installation of reinforcing steel bar, embedded item and form closure Cluster(69)
581 KHEP-CI-581
inspection for RC Stair (first flight) B2 Mockup
NA 25-Apr-2017 26-Apr-2017 2:30 PM 27-Apr-2017 A Approved Closed

Cluster(14)
582 KHEP-CI-582 Second Coat,Damproofing Intallation For RC Footing & Column Neck
B2
NA 26-Apr-2017 27-Apr-2017 10:00 AM 29-Apr-2017 A Approved Closed

Cluster(15)
583 KHEP-CI-583 Second Coat,Damproofing Intallation For RC Footing & Column Neck
B2
NA 26-Apr-2017 27-Apr-2017 10:00 AM 29-Apr-2017 A Approved Closed

584 KHEP-CI-584 Second Coat,Damproofing Intallation For RC Footing & Column Neck Cluster(5) B2 NA 26-Apr-2017 27-Apr-2017 10:00 AM 29-Apr-2017 A Approved Closed

Cluster(52)
585 KHEP-CI-585 Concrete sampling, testing and placement inspection for RC footing
B2
NA 26-Apr-2017 27-Apr-2017 9:30 AM 27-Apr-2017 A Approved Closed

Cluster(33)
586 KHEP-CI-586 Concrete sampling, testing and placement inspection for RC footing
B2
NA 26-Apr-2017 27-Apr-2017 9:30 AM 27-Apr-2017 A Approved Closed

Concrete sampling, testing and placement inspection for RC Column Cluster(11)


587 KHEP-CI-587
neck B2
NA 26-Apr-2017 27-Apr-2017 9:30 AM 27-Apr-2017 A Approved Closed

Installation of reinforcing steel bar, embedded item and form closure Cluster(71)
588 KHEP-CI-588
inspection for RC Column Neck B2
NA 26-Apr-2017 27-Apr-2017 2:30 PM 29-Apr-2017 A Approved Closed

Installation of reinforcing steel bar, embedded item and form closure Cluster(75)
589 KHEP-CI-589
inspection for RC Column Neck B2
NA 26-Apr-2017 27-Apr-2017 2:30 PM 29-Apr-2017 A Approved Closed

Cluster(66)
590 KHEP-CI-590 damproofing surface preparation for RC foundation & Column neck A6 axis NA 26-Apr-2017 27-Apr-2017 2:30 PM 30-Apr-2017 A Approved Closed
(H,J,K,L,M,N)

First Coat, Damproofing Installation Inspection for RC footing & Approved w/


591 KHEP-CI-591
column neck
Cluster(4) A6 NA 26-Apr-2017 27-Apr-2017 10:00 AM 29-Apr-2017 B comments
Closed

Cluster(65)
A6 axis
592 KHEP-CI-592 Cast in place concrete formwork inspection for RC Column neck (A,B,C,D,E,F, NA 26-Apr-2017 27-Apr-2017 2:30 PM 30-Apr-2017 A Approved Closed
G,H,J,K,L,M,N
)
Cluster(30)
593 KHEP-CI-593 Cast in place concrete formwork inspection for RC Footing
B2
NA 26-Apr-2017 29-Apr-2017 2:30 PM 30-Apr-2017 A Approved Closed

Installation of reinforcing steel bar, embedded item and form closure Cluster(30)
594 KHEP-CI-594
inspection for RC Footing B2
NA 26-Apr-2017 29-Apr-2017 2:30 PM 30-Apr-2017 A Approved Closed

Cluster(63)
595 KHEP-CI-595 Cast in place concrete formwork inspection for RC Column neck
B2
NA 26-Apr-2017 29-Apr-2017 2:30 PM 30-Apr-2017 A Approved Closed

Cluster(64)
596 KHEP-CI-596 Cast in place concrete formwork inspection for RC Column neck
B2
NA 26-Apr-2017 29-Apr-2017 2:30 PM 2-May-2017 A Approved Closed

Installation of reinforcing steel bar, embedded item and form closure Cluster(27)
597 KHEP-CI-597
inspection for RC Column Neck B2
NA 26-Apr-2017 29-Apr-2017 2:30 PM 30-Apr-2017 A Approved Closed

Installation of reinforcing steel bar, embedded item and form closure Cluster(33)
598 KHEP-CI-598
inspection for RC Column Neck B2
NA 26-Apr-2017 29-Apr-2017 2:30 PM 30-Apr-2017 A Approved Closed

Cluster(51) Approved w/
599 KHEP-CI-599 Concrete sampling, testing and placement inspection for RC footing
B2
NA 27-Apr-2017 29-Apr-2017 9:30 AM 30-Apr-2017 B comments
Closed

600 KHEP-CI-600 Compaction test 1ST layer general fill (sta,0+000 to 0+108) Alley 14 NA 27-Apr-2017 29-Apr-2017 3:00 PM 30-Apr-2017 A Approved Closed
Termite control surface preparation, installation and final inspection Cluster(61)
601 KHEP-CI-601
for PC foundation B2
NA 29-Apr-2017 30-Apr-2017 10:30 AM 1-May-2017 A Approved Closed

Blinding concrete sampling, testing & placement inspection for Cluster(61)


602 KHEP-CI-602
Footing B2
NA 29-Apr-2017 30-Apr-2017 1:30 PM 2-May-2017 A Approved Closed

Cluster(19)
603 KHEP-CI-603 Cast in place concrete formwork inspection for RC Column neck
B2
NA 29-Apr-2017 30-Apr-2017 2:30 PM 2-May-2017 A Approved Closed

Installation of reinforcing steel bar, embedded item and form closure Cluster(45)
604 KHEP-CI-604
inspection for RC Column Neck A6
NA 29-Apr-2017 30-Apr-2017 2:30 PM 1-May-2017 A Approved Closed

Installation of reinforcing steel bar, embedded item and form closure Cluster(58)
605 KHEP-CI-605
inspection for RC Column Neck B2
NA 29-Apr-2017 30-Apr-2017 2:30 PM 1-May-2017 A Approved Closed

Cluster(20)
606 KHEP-CI-606 Cast in place concrete formwork inspection for RC Column neck
B2
NA 29-Apr-2017 30-Apr-2017 2:30 PM 2-May-2017 A Approved Closed

Cluster(66)
A6 axis
607 KHEP-CI-607 damproofing surface preparation for RC foundation & Column neck
(A,B,C,D,E,F,
NA 29-Apr-2017 30-Apr-2017 2:30 PM 30-Apr-2017 A Approved Closed
G)
Cluster(10)
608 KHEP-CI-608 damproofing surface preparation for RC foundation & Column neck
B2
NA 29-Apr-2017 30-Apr-2017 2:30 PM 1-May-2017 A Approved Closed

Cluster(11)
609 KHEP-CI-609 damproofing surface preparation for RC foundation & Column neck
B2
NA 29-Apr-2017 30-Apr-2017 2:30 PM 1-May-2017 A Approved Closed

Cluster(04) Approved w/
610 KHEP-CI-610 Second Coat,Damproofing Intallation For RC Footing & Column Neck
A6
NA 29-Apr-2017 30-Apr-2017 10:00 AM 1-May-2017 B comments
Closed

First Coat, Damproofing Installation Inspection for RC footing & Cluster(66)


611 KHEP-CI-611
column neck B2
NA 29-Apr-2017 30-Apr-2017 10:00 AM 1-May-2017 A Approved Closed

Concrete sampling, testing and placement inspection for RC Column Cluster(44)


612 KHEP-CI-612
neck A6
NA 29-Apr-2017 30-Apr-2017 9:30 AM 30-Apr-2017 A Approved Closed

Concrete sampling, testing and placement inspection for RC Column Cluster(12)


613 KHEP-CI-613
neck B2
NA 29-Apr-2017 30-Apr-2017 9:30 AM 30-Apr-2017 A Approved Closed

Concrete sampling, testing and placement inspection for RC stair first Cluster(69)
614 KHEP-CI-614
flight ground floor B2 Mockup
NA 29-Apr-2017 30-Apr-2017 9:30 AM 30-Apr-2017 A Approved Closed

Road
No:05(sta
615 KHEP-CI-615 Compaction test 3rd layer general fill
0+150 to
NA 30-Apr-2017 1-May-2017 3:00 PM 3-May-2017 A Approved Closed
0+223)
Installation of reinforcing steel bar, embedded item and form closure Cluster(51)
616 KHEP-CI-616
inspection for RC Column Neck B2
NA 30-Apr-2017 1-May-2017 2:30 PM 2-May-2017 A Approved Closed

Installation of reinforcing steel bar, embedded item and form closure Cluster(52)
617 KHEP-CI-617
inspection for RC Column Neck B2
NA 30-Apr-2017 1-May-2017 2:30 PM 2-May-2017 A Approved Closed

Installation of reinforcing steel bar, embedded item and form closure Cluster(54)
618 KHEP-CI-618
inspection for RC Column Neck B2
NA 30-Apr-2017 1-May-2017 2:30 PM 3-May-2017 E Rejected Closed

Installation of reinforcing steel bar, embedded item and form closure Cluster(54)
618.1 KHEP-CI-618-01
inspection for RC Column Neck B2
NA 4-May-2017 6-Apr-2017 2:30 PM 7-May-2017 A Approved Closed

Installation of reinforcing steel bar, embedded item and form closure Cluster(34)
619 KHEP-CI-619
inspection for RC Column Neck B2
NA 30-Apr-2017 1-May-2017 2:30 PM 3-May-2017 E Rejected Closed

Installation of reinforcing steel bar, embedded item and form closure Cluster(34)
619.1 KHEP-CI-619-1
inspection for RC Column Neck B2
NA 8-May-2017 9-May-2017 2:30 PM 11-May-2017 A Approved Closed

Cluster(12)
620 KHEP-CI-620 damproofing surface preparation for RC foundation & Column neck
B2
NA 30-Apr-2017 1-May-2017 2:30 PM 2-May-2017 A Approved Closed

Cluster(13)
621 KHEP-CI-621 damproofing surface preparation for RC foundation & Column neck
B2
NA 30-Apr-2017 1-May-2017 2:30 PM 2-May-2017 A Approved Closed
Cluster(34)
622 KHEP-CI-622 Concrete sampling, testing and placement inspection for RC footing
B2
NA 30-Apr-2017 1-May-2017 9:30 AM 2-May-2017 A Approved Closed

Cluster(30)
623 KHEP-CI-623 Concrete sampling, testing and placement inspection for RC footing
B2
NA 30-Apr-2017 1-May-2017 9:30 AM 2-May-2017 A Approved Closed

Concrete sampling, testing and placement inspection for RC Column Cluster(65)


624 KHEP-CI-624
neck A6
NA 30-Apr-2017 1-May-2017 9:30 AM 2-May-2017 A Approved Closed

Cluster(68)
625 KHEP-CI-625 Second Coat,Damproofing Intallation For RC Footing & Column Neck
B2
NA 30-Apr-2017 1-May-2017 10:00 AM 2-May-2017 A Approved Closed

Cluster(6)
626 KHEP-CI-626 Cast in place concrete formwork inspection for RC Footing
BC4
NA 1-May-2017 2-May-2017 2:30 PM 3-May-2017 E Rejected Closed

Cluster(6)
626.1 KHEP-CI-626-01 Cast in place concrete formwork inspection for RC Footing
BC4
NA 4-May-2017 6-May-2017 9:30 AM 7-May-2017 A Approved Closed

Installation of reinforcing steel bar, embedded item and form closure Cluster(6)
627 KHEP-CI-627
inspection for RC Footing BC4
NA 1-May-2017 2-May-2017 2:30 PM 3-May-2017 E Rejected Closed

Installation of reinforcing steel bar, embedded item and form closure Cluster(6)
627 KHEP-CI-627-01
inspection for RC Footing BC4
NA 4-May-2017 6-May-2017 9:30 AM 7-May-2017 A Approved Closed

Cluster(27)
628 KHEP-CI-628 Cast in place concrete formwork inspection for RC Column neck
B2
NA 1-May-2017 2-May-2017 2:30 PM 4-May-2017 A Approved Closed

Cluster(71)
629 KHEP-CI-629 Cast in place concrete formwork inspection for RC Column neck
B2
NA 1-May-2017 2-May-2017 2:30 PM 3-May-2017 A Approved Closed

Cluster(72)
630 KHEP-CI-630 Damproofing surface preparation for RC foundation & Column neck
B2
NA 1-May-2017 2-May-2017 2:30 PM 3-May-2017 A Approved Closed

Cluster(73)
631 KHEP-CI-631 Damproofing surface preparation for RC foundation & Column neck
B2
NA 1-May-2017 2-May-2017 2:30 PM 3-May-2017 A Approved Closed

First Coat, Damproofing Installation Inspection for RC footing & Cluster(10)


632 KHEP-CI-632
column neck B2
NA 1-May-2017 2-May-2017 10:00 AM 3-May-2017 A Approved Closed

First Coat, Damproofing Installation Inspection for RC footing & Cluster(11)


633 KHEP-CI-633
column neck B2
NA 1-May-2017 2-May-2017 10:00 AM 3-May-2017 A Approved Closed

Concrete sampling, testing and placement inspection for RC Column Cluster(63)


634 KHEP-CI-634
neck B2
NA 1-May-2017 2-May-2017 9:30 AM 3-May-2017 A Approved Closed

Concrete sampling, testing and placement inspection for RC Column Cluster(64)


635 KHEP-CI-635
neck B2
NA 1-May-2017 2-May-2017 9:30 AM 3-May-2017 A Approved Closed

Concrete sampling, testing and placement inspection for RC Column Cluster(19)


636 KHEP-CI-636
neck B2
NA 1-May-2017 2-May-2017 9:30 AM 3-May-2017 A Approved Closed

Concrete sampling, testing and placement inspection for RC Column Cluster(20)


637 KHEP-CI-637
neck B2
NA 1-May-2017 2-May-2017 9:30 AM 3-May-2017 A Approved Closed

Zone 1B
Alley 01
(sta,0+100 to
638 KHEP-CI-638 Compaction test 1st layer general fill 0+193) NA 1-May-2017 2-May-2017 3:00 PM 3-May-2017 E Rejected Closed
Alley 11
(sta,0+000 to
0+075)
Zone 1B
Alley 01
(sta,0+100 to
638.1 KHEP-CI-638-01 Compaction test 1st layer general fill 0+193) NA 4-May-2017 6-May-2017 3:00 PM 6-May-2017 A Approved Closed
Alley 11
(sta,0+000 to
0+075)
Compaction test 2nd layer general fill (sta,0+000 to 0+108)
639 KHEP-CI-639
(Excluding cross)
Alley 14 NA 1-May-2017 2-May-2017 3:00 PM 3-May-2017 E Rejected Closed

Compaction test 2nd layer general fill (sta,0+000 to 0+108)


639.1 KHEP-CI-639-01
(Excluding road intersection)
Alley 14 NA 4-May-2017 6-May-2017 3:00 PM 6-May-2017 A Approved Closed

Jobsite Stcok
Soil sample fine sand for sand bedding & sand caution pile no:07 01-05-2017 02-05-2017 Recall
640 KHEP-CI-640
Sampling fine sand for sand bedding Jobsite Stcok
NA
[Resubmit 04-05-2017]
[Resubmit 06-05-2017]
3:00 PM 2-May-2017 E Rejected
Closed
pile no:07

Cluster(45)
641 KHEP-CI-641 Cast in place concrete formwork inspection for RC Column neck
A6
NA 2-May-2017 3-May-2017 2:30 PM 4-May-2017 A Approved Closed

Second Coat, Damproofing Installation Inspection for RC footing & Cluster(11)


642 KHEP-CI-642
column neck B2
NA 2-May-2017 3-May-2017 10:00 AM 4-May-2017 A Approved Closed

Second Coat, Damproofing Installation Inspection for RC footing & Cluster(10)


643 KHEP-CI-643
column neck B2
NA 2-May-2017 3-May-2017 10:00 AM 4-May-2017 A Approved Closed
Cluster(63)
644 KHEP-CI-644 Damproofing surface preparation for RC foundation & Column neck
B2
NA 2-May-2017 3-May-2017 2:30 PM 4-May-2017 A Approved Closed

Cluster(64)
645 KHEP-CI-645 Damproofing surface preparation for RC foundation & Column neck
B2
NA 2-May-2017 3-May-2017 2:30 PM 4-May-2017 E Rejected Closed

Cluster(64)
645.1 KHEP-CI-645-01 Damproofing surface preparation for RC foundation & Column neck
B2
NA 6-May-2017 7-May-2017 2:30 PM 8-May-2017 A Approved Closed

Cluster(2B)
646 KHEP-CI-646 Compaction test 1ST layer general fill(Selected fill)
C35
NA 2-May-2017 3-May-2017 2:00 PM 4-May-2017 A Approved Closed

Zone 1B
Alley 02
(sta,0+050 to
647 KHEP-CI-647 Compaction test 5th layer general fill 0+117) NA 2-May-2017 3-May-2017 3:00 PM 4-May-2017 A Approved Closed
Alley 11
(sta,0+075 to
0+100)
Road
No:05(sta
648 KHEP-CI-648 Compaction test 4th layer general fill
0+150 to
NA 2-May-2017 3-May-2017 3:00 PM 4-May-2017 A Approved Closed
0+223)
Cluster(19)
649 KHEP-CI-649 Damproofing surface preparation for RC foundation & Column neck
B2
NA 3-May-2017 4-May-2017 2:30 PM 7-May-2017 A Approved Closed

Cluster(20)
650 KHEP-CI-650 Damproofing surface preparation for RC foundation & Column neck
B2
NA 3-May-2017 4-May-2017 2:30 PM 7-May-2017 A Approved Closed

First Coat, Damproofing Installation Inspection for RC footing & Cluster(12)


651 KHEP-CI-651
column neck B2
NA 3-May-2017 4-May-2017 10:00 AM 6-May-2017 A Approved Closed

First Coat, Damproofing Installation Inspection for RC footing & Cluster(13)


652 KHEP-CI-652
column neck B2
NA 3-May-2017 4-May-2017 10:00 AM 6-May-2017 A Approved Closed

Cluster(75)
653 KHEP-CI-653 Cast in place concrete formwork inspection for RC Footing
B2
NA 3-May-2017 4-May-2017 2:30 PM 7-May-2017 A Approved Closed

Cluster(33)
654 KHEP-CI-654 Cast in place concrete formwork inspection for RC Column neck
B2
NA 3-May-2017 4-May-2017 2:30 PM 7-May-2017 A Approved Closed

Cluster(61)
655 KHEP-CI-655 Cast in place concrete formwork inspection for RC Footing
B2
NA 3-May-2017 4-May-2017 2:30 PM 6-May-2017 A Approved Closed

Installation of reinforcing steel bar, embedded item and form closure Cluster(61)
656 KHEP-CI-656
inspection for RC Footing B2
NA 3-May-2017 4-May-2017 2:30 PM 6-May-2017 A Approved Closed

657 KHEP-CI-657 Compaction test & formation existing level (sta,0+000 to 0+117) Alley 04 NA 3-May-2017 4-May-2017 3:00 PM 7-May-2017 A Approved Closed

Zone 1B
658 KHEP-CI-658 Inspection of excavated formation for pipe trench-sewar maine line MH(3-L03) to NA 4-May-2017 6-Apr-2017 3:00 PM 8-May-2017 A Approved Closed
MH (1A-L03)

Concrete sampling, testing and placement inspection for RC Column Cluster(71)


659 KHEP-CI-659
neck B2
NA 4-May-2017 6-May-2017 9:30 AM 7-May-2017 A Approved Closed

Cluster(6) Approved w/
660 KHEP-CI-660 Concrete sampling, testing and placement inspection for RC footing
BC4
NA 4-May-2017 6-May-2017 9:30 AM 7-May-2017 B comments
Closed

Cluster(12)
661 KHEP-CI-661 Second Coat,Damproofing Intallation For RC Footing & Column Neck
B2
NA 4-May-2017 6-May-2017 10:00 AM 7-May-2017 A Approved Closed

Cluster(13)
662 KHEP-CI-662 Second Coat,Damproofing Intallation For RC Footing & Column Neck
B2
NA 4-May-2017 6-May-2017 10:00 AM 7-May-2017 A Approved Closed

First Coat, Damproofing Installation Inspection for RC footing & Cluster(73)


663 KHEP-CI-663
column neck B2
NA 4-May-2017 6-May-2017 10:00 AM 7-May-2017 A Approved Closed

First Coat, Damproofing Installation Inspection for RC footing & Cluster(63)


664 KHEP-CI-664
column neck B2
NA 4-May-2017 6-May-2017 10:00 AM 7-May-2017 A Approved Closed

termite control surface preparation, installation and final inspection


665 KHEP-CI-665
for PC grad beam
Cluster(2) A6 NA 4-May-2017 6-May-2017 10:30 AM 7-May-2017 A Approved Closed

Blinding concrete sampling, testing & placement inspection for grad


666 KHEP-CI-666
beam
Cluster(2) A6 NA 4-May-2017 6-May-2017 1:30 PM 7-May-2017 A Approved Closed

termite control surface preparation, installation and final inspection Cluster(35)


667 KHEP-CI-667
for PC footing B2
NA 4-May-2017 6-May-2017 10:30 AM 7-May-2017 A Approved Closed

Blinding concrete sampling, testing & placement inspection for Cluster(35)


668 KHEP-CI-668
Footing B2
NA 4-May-2017 6-May-2017 1:30 PM 7-May-2017 A Approved Closed

Cluster(46)
669 KHEP-CI-669 Cast in place concrete formwork inspection for RC Column neck
A6
NA 4-May-2017 6-May-2017 9:30 AM 7-May-2017 A Approved Closed

Installation of reinforcing steel bar, embedded item and form closure


670 KHEP-CI-670
inspection for RC grad beam
Cluster(1) A6 NA 4-May-2017 6-May-2017 2:30 PM 8-May-2017 E Rejected Closed

Installation of reinforcing steel bar, embedded item and form closure


670.1 KHEP-CI-670-01
inspection for RC grad beam
Cluster 01 A6 NA 10-May-2017 11-May-2017 1:30 PM 13-May-2017 E Rejected Closed
Installation of reinforcing steel bar, embedded item and form closure
670.2 KHEP-CI-670-02
inspection for RC grad beam
Cluster 01 A6 NA 17-May-2017 18-May-2017 10:30 AM 20-May-2017 A Approved Closed

Cluster(73)
671 KHEP-CI-671 Second Coat,Damproofing Intallation For RC Footing & Column Neck
B2
NA 6-May-2017 7-May-2017 10:00 AM 8-May-2017 A Approved Closed

Cluster(63)
672 KHEP-CI-672 Second Coat,Damproofing Intallation For RC Footing & Column Neck
B2
NA 6-May-2017 7-May-2017 10:00 AM 8-May-2017 A Approved Closed

Cluster(72)
673 KHEP-CI-673 First Coat,Damproofing Intallation For RC Footing & Column Neck
B2
NA 6-May-2017 7-May-2017 10:00 AM 8-May-2017 A Approved Closed

Cluster(64)
674 KHEP-CI-674 First Coat,Damproofing Intallation For RC Footing & Column Neck
B2
NA 6-May-2017 7-May-2017 10:00 AM 8-May-2017 A Approved Closed

Cluster(16)
675 KHEP-CI-675 Cast in place concrete formwork inspection for RC Footing
BC4
NA 6-May-2017 7-May-2017 2:30 PM 8-May-2017 A Approved Closed

Installation of reinforcing steel bar, embedded item and form closure Cluster(16)
676 KHEP-CI-676
inspection for RC footing BC4
NA 6-May-2017 7-May-2017 2:30 PM 8-May-2017 A Approved Closed

Installation of reinforcing steel bar, embedded item and form closure Cluster(61)
677 KHEP-CI-677
inspection for RC Column Neck B2
NA 6-May-2017 7-May-2017 2:30 PM 8-May-2017 A Approved Closed

Concrete sampling, testing and placement inspection for RC Column Cluster(45)


678 KHEP-CI-678
neck A6
NA 6-May-2017 7-May-2017 9:30 AM 7-May-2017 A Approved Closed

Cluster(61)
679 KHEP-CI-679 Concrete sampling, testing and placement inspection for RC footing
B2
NA 6-May-2017 7-May-2017 9:30 AM 7-May-2017 A Approved Closed

Compaction test 6th layer general fill (sta,0+100 to 0+117)


680 KHEP-CI-680 (excluding road 2 intersection) Alley 02 NA 6-May-2017 7-May-2017 3:00 PM 8-May-2017 E Rejected Closed
Alley 11 (sta,0+75 to 0+100)
Compaction test 6th layer general fill
680.1 KHEP-CI-680-01 Alley 2 (sta,0+100 to 0+117)(excluding road 2 intersection) Alley Alley 02,11 NA Division 31 4-Jul-2017 5-Jul-2017 11:00 AM 7-Jun-2017 A Approved Closed
11 (sta,0+075 to 0+100)
Compaction test 2nd layer general fill (sta,0+75 to 0+100)
681 KHEP-CI-681
(excluding Ally 1 intersection)
Alley 11 6-May-2017 7-May-2017 3:00 PM 8-May-2017 E Rejected Closed

Compaction test 2nd layer general fill (sta,0+75 to 0+100)


681.1 KHEP-CI-681-1
(excluding Ally 1 intersection)
Alley 11 8-May-2017 9-May-2017 3:00 PM 10-May-2017 A Approved Closed

Cluster(72)
682 KHEP-CI-682 Second Coat,Damproofing Intallation For RC Footing & Column Neck
B2
7-May-2017 8-May-2017 10:00 AM 9-May-2017 A Approved Closed

Cluster(64)
683 KHEP-CI-683 Second Coat,Damproofing Intallation For RC Footing & Column Neck
B2
7-May-2017 8-May-2017 10:00 AM 9-May-2017 A Approved Closed

Cluster(35)
684 KHEP-CI-684 Cast in Place Concrete formwork inspection For RC Footing
B2
7-May-2017 8-May-2017 2:30 PM 10-May-2017 A Approved Closed

Installation of reinforcing steel bar embedded item and form closure Cluster(35)
685 KHEP-CI-685
inspection for RC Footing B2
7-May-2017 8-May-2017 2:30 PM 10-May-2017 A Approved Closed

Cluster(43)
686 KHEP-CI-686 Dam proofing surface Preparation for RC Foundation & Column Neck
A6
7-May-2017 8-May-2017 2:30 PM 9-May-2017 E Rejected Closed

Cluster(43)
686.1 KHEP-CI-686-01 Dam proofing surface Preparation for RC Foundation & Column Neck
A6
21-May-2017 22-May-2017 2:30 PM 23-May-2017 E Rejected Closed

Cluster 43, Approved w/


686.2 KHEP-CI-686-02 Dam proofing surface Preparation for RC Foundation & Column Neck
A6
27-May-2017 28-May-2017 8:00 AM 28-May-2017 B comments
Closed

Cluster(54)
687 KHEP-CI-687 Cast in place concrete formwork inspection for RC Column Neck
B2
7-May-2017 8-May-2017 2:30 PM 9-May-2017 A Approved Closed

Compaction test 3rd layer general fill (sta,0+000 to 0+108)


688 KHEP-CI-688
(excluding Ally 4 & 6 intersection)
Alley 14 7-May-2017 8-May-2017 3:00 PM 9-May-2017 A Approved Closed

Road
No:05(sat
689 KHEP-CI-689 Compaction test 5th layer general fill
0+200 to
7-May-2017 8-May-2017 3:00 PM 9-May-2017 A Approved Closed
0+223)
Zone 1B
MH(1A-L03) Approved w/
690 KHEP-CI-690 Inspection of excavated formation for pipe trench-swear Maine line
to MH (5-
7-May-2017 8-May-2017 3:00 PM 9-May-2017 B comments
Closed
L01)

Zone 1B
Approved w/
691 KHEP-CI-691 Inspection of excavated formation for pipe trench-swear Maine line MH(1-L03) to 7-May-2017 8-May-2017 3:00 PM 9-May-2017 B comments
Closed
MH (2-L04)

Zone 1B
Approved w/
692 KHEP-CI-692 Inspection of excavated formation for pipe trench-swear Maine line MH(1-L04) to 7-May-2017 8-May-2017 3:00 PM 9-May-2017 B comments
Closed
MH (2-L05)

Cluster(19)
693 KHEP-CI-693 First Coat,Damproofing Installation For RC Footing & Column Neck
B2
8-May-2017 9-May-2017 10:00 AM 10-May-2017 A Approved Closed
Cluster(20)
694 KHEP-CI-694 First Coat,Damproofing Installation For RC Footing & Column Neck
B2
8-May-2017 9-May-2017 10:00 AM 10-May-2017 A Approved Closed

Concrete sampling, testing and placement inspection for RC Column Cluster(33)


695 KHEP-CI-695
neck B2
8-May-2017 9-May-2017 9:30 AM 10-May-2017 A Approved Closed

Concrete sampling, testing and placement inspection for RC Column Cluster(75)


696 KHEP-CI-696
neck B2
8-May-2017 9-May-2017 9:30 AM 10-May-2017 A Approved Closed

Concrete sampling, testing and placement inspection for RC Column Cluster(46)


697 KHEP-CI-697
neck A6
8-May-2017 9-May-2017 9:30 AM 10-May-2017 A Approved Closed

Installation of reinforcing steel bar embedded item and form closure Cluster(6)
698 KHEP-CI-698
inspection for RC Column BC4
8-May-2017 9-May-2017 2:30 PM 11-May-2017 A Approved Closed

Cluster(44)
699 KHEP-CI-699 Dam proofing surface Preparation for RC Foundation & Column Neck
A6
8-May-2017 9-May-2017 2:30 PM 10-May-2017 E Rejected Closed

699.1 KHEP-CI-699-01 Dam proofing surface Preparation for RC Foundation & Column Neck Cluster 44 A6 14-May-2017 15-May-2017 2:30 PM 16-May-2017 A Approved Closed

Installation of reinforcing steel bar embedded item and form closure Cluster(30)
700 KHEP-CI-700
inspection for RC Column B2
8-May-2017 9-May-2017 2:30 PM 10-May-2017 A Approved Closed

Zone 1B
Approved w/
701 KHEP-CI-701 Compaction test of bedding Under Pipe Trench-Swear Maine Line MH(3-L03) to 8-May-2017 9-May-2017 3:00 PM 10-May-2017 B comments
Closed
MH (1A-L03)

Zone 1B
702 KHEP-CI-702 Inspection of excavated formation for pipe trench-swear Maine line MH(4-L08) to 8-May-2017 9-May-2017 3:00 PM 10-May-2017 A Approved Closed
MH (1-L08)

Zone 1B
703 KHEP-CI-703 Inspection of excavated formation for pipe trench-swear Maine line MH(1-L08) to 8-May-2017 9-May-2017 3:00 PM 10-May-2017 E Rejected Closed
MH (7-L01)

Zone 1B
703.1 KHEP-CI-703-01 Inspection of excavated formation for pipe trench-swear Maine line MH(1-L08) to 11-May-2017 13-May-2017 3:00 PM 15-May-2017 A Approved Closed
MH (7-L01)

Zone 1B
704 KHEP-CI-704 Inspection of excavated formation for pipe trench-swear Maine line MH(1-L07) to 8-May-2017 9-May-2017 3:00 PM 10-May-2017 A Approved Closed
MH (3-L08)

Zone 1B
705 KHEP-CI-705 Inspection of excavated formation for pipe trench-swear Maine line MH(1-L06) to 8-May-2017 9-May-2017 3:00 PM 10-May-2017 A Approved Closed
MH (2-L08)

Cluster(69)
706 KHEP-CI-706 Cast in Place Concrete formwork inspection For RC First Floor Slab
B2-Mockup
8-May-2017 9-May-2017 2:30 PM 11-May-2017 E Rejected Closed

706.1 KHEP-CI-706-01 Cast in Place Concrete formwork inspection For RC First Floor Slab Cluster 69 B2 14-May-2017 15-May-2017 2:30 PM 18-May-2017 A Approved Closed

Installation of reinforcing steel bar embedded item and form closure Cluster(69)
707 KHEP-CI-707
inspection for RC First Floor Slab B2-Mockup
8-May-2017 9-May-2017 2:30 PM 11-May-2017 E Rejected Closed

Installation of reinforcing steel bar embedded item and form closure Cluster(69)
707.1 KHEP-CI-707-01
inspection for RC First Floor Slab B2-Mockup
13-May-2017 14-May-2017 2:30 PM 15-May-2017 E Rejected Closed

Installation of reinforcing steel bar embedded item and form closure Cluster(69)
707.2 KHEP-CI-707-02
inspection for RC First Floor Slab B2-Mockup
16-May-2017 17-May-2017 10:30 AM 18-May-2017 A Approved Closed

Cluster(16)
708 KHEP-CI-708 Concrete sampling, testing and placement inspection for RC Footing
BC4
9-May-2017 10-May-2017 9:30 AM 10-May-2017 A Approved Closed

Cluster(19)
709 KHEP-CI-709 Second Coat,Damproofing Installation For RC Footing & Column Neck
B2
9-May-2017 10-May-2017 10:00 AM 11-May-2017 A Approved Closed

Cluster(20)
710 KHEP-CI-710 Second Coat,Damproofing Installation For RC Footing & Column Neck
B2
9-May-2017 10-May-2017 10:00 AM 11-May-2017 A Approved Closed

Cluster(51)
711 KHEP-CI-711 Cast in place concrete formwork inspection for RC Column neck
B2
9-May-2017 10-May-2017 2:30 PM 11-May-2017 A Approved Closed

Cluster(52)
712 KHEP-CI-712 Cast in place concrete formwork inspection for RC Column neck
B2
9-May-2017 10-May-2017 2:30 PM 11-May-2017 A Approved Closed

Termite control surface preparation, installation and final inspection Cluster(17) 09-05-2017
713 KHEP-CI-713
for PC grad beam B2 09-05-2017-Recall
10-May-2017 10:30 AM 13-May-2017 E Rejected Closed

Blinding concrete sampling, testing & placement inspection for grad Cluster(17) 09-05-2017
714 KHEP-CI-714
beam B2 09-05-2017-Recall
10-May-2017 1:30 PM 13-May-2017 E Rejected Closed

Termite control surface preparation, installation and final inspection 09-05-2017


715 KHEP-CI-715
for PC grad beam
Cluster(8) B2
09-05-2017-Recall
10-May-2017 10:30 AM 13-May-2017 E Rejected Closed
Blinding concrete sampling, testing & placement inspection for grad 09-05-2017
716 KHEP-CI-716
beam
Cluster(8) B2
09-05-2017-Recall
10-May-2017 1:30 PM 13-May-2017 E Rejected Closed

Installation of reinforcing steel bar embedded item and form closure Cluster(16) Approved w/
717 KHEP-CI-717
inspection for RC Column Neck BC4
9-May-2017 10-May-2017 2:30 PM 11-May-2017 B comments
Closed

Zone 1B
718 KHEP-CI-718 Compaction Test of Bedding Under Pipe Trench-Swear Maine Line MH(1-L03) to 9-May-2017 10-May-2017 3:00 PM 11-May-2017 A Approved Closed
MH (5-L01)

Zone 1B
719 KHEP-CI-719 Compaction Test of Bedding Under Pipe Trench-Swear Maine Line MH(1-L03) to 9-May-2017 10-May-2017 3:00 PM 11-May-2017 A Approved Closed
MH (2-L04)

Zone 1B
720 KHEP-CI-720 Compaction Test of Bedding Under Pipe Trench-Swear Maine Line MH(1-L04) to 9-May-2017 10-May-2017 3:00 PM 11-May-2017 A Approved Closed
MH (2-L05)

Plate Load Bearing test Excavated Formation Level Bottom of Zone 2B/ C- Approved w/
721 KHEP-CI-721
Foundation 31
9-May-2017 10-May-2017 2:00 PM 10-May-2017 B comments
Closed

Zone 3B/ C-
Plate Load Bearing test Excavated Formation Level Bottom of Approved w/
722 KHEP-CI-722
Foundation
48 9-May-2017 10-May-2017 2:00 PM 10-May-2017 B comments
Closed

Zone 1A
723 KHEP-CI-723 Survey verification for excavated retention basin (Pond Areas) 10-05-2017 11-05-2017 11-May-2017 10:00 AM RECALLED
(Pond-01)
Survey verification for excavated materials quantity survey cut and
724 KHEP-CI-724
fill report by (Falcon) Area Office,
Pond 3,5 Zone A 13-05-17 14-05-2017 9:00 AM 15-May-2017 E Rejected Closed

Cast in place concrete formwork inspection for RC Stair (Second Cluster 69,
725 KHEP-CI-725
flight) B2 ( Mockup)
10-May-2017 11-May-2017 11:00 AM 18-May-2017 A Approved Closed

Installation of reinforcing steel bar embedded item and form closure Cluster 69,
726 KHEP-CI-726
inspection for RC Stair(Second flight) B2 ( Mockup)
10-May-2017 11-May-2017 10:30 AM 13-May-2017 A Approved Closed

First Coat, Damproofing Installation Inspection For RC Footing & Cluster 66,
727 KHEP-CI-727
Column Neck A6
10-May-2017 11-May-2017 10:00 AM 13-May-2017 A Approved Closed

728 KHEP-CI-728 Concrete sampling, testing and placement inspection for RC Footing Cluster 35, B2 10-May-2017 11-May-2017 9:30 AM 13-May-2017 A Approved Closed

Concrete sampling, testing and placement inspection for RC Column


729 KHEP-CI-729
neck
Cluster 54, B2 10-May-2017 11-May-2017 9:30 AM 13-May-2017 A Approved Closed

730 KHEP-CI-730 Cast in place concrete formwork inspection for RC Column neck Cluster 30, B2 10-May-2017 11-May-2017 2:30 PM 13-May-2017 A Approved Closed

731 KHEP-CI-731 Cast in place concrete formwork inspection for RC Column neck Cluster 34, B2 10-May-2017 11-May-2017 2:30 PM 13-May-2017 A Approved Closed

Zone 1B
732 KHEP-CI-732 Compaction test of bedding Under Pipe Trench-Swear Maine Line MH(1-L07) to 10-May-2017 11-May-2017 10:00 AM 13-May-2017 A Approved Closed
MH (3-L08)

Zone 1B
733 KHEP-CI-733 Compaction test of bedding Under Pipe Trench-Swear Maine Line MH(1-L06) to 10-May-2017 11-May-2017 10:00 AM 13-May-2017 A Approved Closed
MH (2-L08)

Zone 1B
734 KHEP-CI-734 Compaction test of bedding Under Pipe Trench-Swear Maine Line MH(1-L08) to 10-May-2017 11-May-2017 10:00 AM 13-May-2017 A Approved Closed
MH (1-L08)

Road
No:01(sta
0+000 to
735 KHEP-CI-735 Compaction test 2nd layer (final backfilling) general fill 0+200) 10-May-2017 13-May-2017 3:00 PM 14-May-2017 E Rejected Closed
(excluding
road 2
intersection)
Road
No:01(sta
0+000 to
735.1 KHEP-CI-735-01 Compaction test 2nd layer (final backfilling) general fill 0+200) 16-May-2017 17-May-2017 3:00 PM 20-May-2017 A Approved Closed
(excluding
road 2
intersection)

Zone 3B, C31


736 KHEP-CI-736 Compaction test 1st and final layer Sturctural fill(Selected fill) 11-May-2017 13-May-2017 2:00 PM 15-May-2017 A Approved Closed

Zone 3B, C48


737 KHEP-CI-737 Compaction test 1st and final layer Sturctural fill(Selected fill) 11-May-2017 13-May-2017 2:00 PM 15-May-2017 A Approved Closed

Second Coat, Damproofing Intallation Inspection For RC Footing & Cluster 66,
738 KHEP-CI-738
Column Neck A6
11-May-2017 13-May-2017 10:00 AM 14-May-2017 A Approved Closed

Installation of reinforcing steel bar embedded item and form closure


739 KHEP-CI-739
inspection for RC Grad Beam
Cluster 02 A6 NA 11-May-2017 13-May-2017 1:30 PM 14-May-2017 E Rejected Closed

Installation of reinforcing steel bar embedded item and form closure


739 KHEP-CI-739-01
inspection for RC Grad Beam
Cluster 02 A6 NA 28-May-2017 29-May-2017 10:00 AM 30-May-2017 A Approved Closed

740 KHEP-CI-740 Cast in place concrete formwork inspection for RC Grad Beam Cluster 01 A6 NA 11-May-2017 13-May-2017 10:30 AM 14-May-2017 E Rejected Closed

740.1 KHEP-CI-740-01 Cast in place concrete Form work inspection for RC Grad Beam Cluster 01 A6 NA 17-May-2017 18-May-2017 10:30 AM 20-May-2017 A Approved Closed

Concrete sampling, testing and placement inspection for RC Column


741 KHEP-CI-741
neck
Cluster 52, B2 13-May-2017 14-May-2017 9:30 AM 14-May-2017 A Approved Closed

Concrete sampling, testing and placement inspection for RC Column


742 KHEP-CI-742
neck
Cluster 51, B2 13-May-2017 14-May-2017 9:30 AM 14-May-2017 A Approved Closed

Concrete sampling, testing and placement inspection for RC Column


743 KHEP-CI-743
neck
Cluster 30, B2 13-May-2017 14-May-2017 9:30 AM 14-May-2017 A Approved Closed

Concrete sampling, testing and placement inspection for RC Column


744 KHEP-CI-744
neck
Cluster 34, B2 13-May-2017 14-May-2017 9:30 AM 14-May-2017 A Approved Closed

745 KHEP-CI-745 Cast in place concrete formwork inspection for RC Column neck Cluster 61, B2 13-May-2017 14-May-2017 2:30 PM 15-May-2017 A Approved Closed

Zone 1B
746 KHEP-CI-746 Compaction test of bedding Under Pipe Trench-Swear Maine Line MH(1-L08) to 13-May-2017 14-May-2017 3:00 PM 15-May-2017 E Rejected Closed
MH (7-L01)

Zone 1B
746.1 KHEP-CI-746-01 Compaction test of bedding Under Pipe Trench-Swear Maine Line MH(1-L08) to 16-May-2017 17-May-2017 3:00 PM 17-May-2017 A Approved Closed
MH (7-L01)

Zone 1B, C21


747 KHEP-CI-747 Compaction test excavated formation level Bottom of foundation 13-May-2017 14-May-2017 2:00 PM 15-May-2017 A Approved Closed

First Coat, Damproofing Installation Inspection For RC Footing & Cluster 44,
748 KHEP-CI-748
Column Neck A6
13-May-2017 14-May-2017 10:00 AM 15-May-2017 E Rejected Closed

First Coat, Damproofing Installation Inspection For RC Footing & Cluster 44,
748.1 KHEP-CI-748-01
Column Neck A6
16-May-2017 17-May-2017 10:30 AM 17-May-2017 A Approved Closed

Jobsite Stock
749 KHEP-CI-749 Sampling- Aggregate sub base materials
Pile 8
14-May-2017 15-May-2017 3:00 PM 15-May-2017 E Rejected Closed

Jobsite Stock
749.1 KHEP-CI-749-01 Sampling- Aggregate sub base materials
Pile 8
18-May-2017 20-May-2017 3:00 PM 21-May-2017 E Rejected Closed

Jobsite Approved w/
749.2 KHEP-CI-749-02 Sampling- Aggregate sub base materials
StockPile 8
22-May-2017 23-May-2017 10:00 AM 24-May-2017 B comments
Closed

Sampling- Aggregate sub base materials Jobsite


749.3 KHEP-CI-749-03
Jobsite StockPile 8 StockPile 8
NA Division 31 4-Jul-2017 5-Jul-2017 10:00 AM 6-Jul-2017 E Rejected Closed

Zone 1B / C-
750 KHEP-CI-750 Compaction Test excavated formation level bottom of foundation
09
14-May-2017 15-May-2017 2:00 PM 16-May-2017 A Approved Closed

Cluster 45,
751 KHEP-CI-751 Dam proofing surface Preparation for RC Foundation & Column Neck
A6
14-May-2017 15-May-2017 2:30 PM 16-May-2017 A Approved Closed

Cluster 65,
752 KHEP-CI-752 Dam proofing surface Preparation for RC Foundation & Column Neck
A6
14-May-2017 15-May-2017 2:30 PM 15-May-2017 A Approved Closed

Installation of reinforcing steel bar embedded item and form closure


753 KHEP-CI-753
inspection for RC Column Neck
Cluster 35, B2 14-May-2017 15-May-2017 2:30 PM 16-May-2017 A Approved Closed

Cast in place concrete formwork inspection for RC Column neck, Cluster 6,


754 KHEP-CI-754
excluding W4 @ grid line B6 & H6 BC4
14-May-2017 15-May-2017 2:30 PM 16-May-2017 A Approved Closed
From MH1-
L08-MH2-
L08-MH3-L08
From MH2- Approved w/
755 KHEP-CI-755 Installation of Sanitary Sewer uPVC pipes 200mm, Class 4
L08-MH1-L06
14-May-2017 15-May-2017 9:00 AM 16-May-2017 B comments
Closed
&
From MH3-
L08-MH1-L07

Termite control surface preparation, installation and final inspection


756 KHEP-CI-756
for PC footing
Cluster 31, B2 14-May-2017 15-May-2017 10:30 AM 16-May-2017 A Approved Closed

Blinding concrete sampling, testing & placement inspection for


757 KHEP-CI-757
Footing
Cluster 31, B2 14-May-2017 15-May-2017 1:30 PM 16-May-2017 A Approved Closed

Termite control surface preparation, installation and final inspection


758 KHEP-CI-758
for PC footing
Cluster 48, B2 14-May-2017 15-May-2017 10:30 AM 16-May-2017 A Approved Closed

Blinding concrete sampling, testing & placement inspection for


759 KHEP-CI-759
Footing
Cluster 48, B2 14-May-2017 15-May-2017 1:30 PM 16-May-2017 A Approved Closed

First Coat, Damproofing Installation Inspection for RC footing & Cluster 45,
760 KHEP-CI-760
column neck A6
15-May-2017 16-May-2017 2:30 PM 17-May-2017 A Approved Closed

Zone 1B /
761 KHEP-CI-761 Compaction test 1st and final layer structural fill(Selected fill)
C21 (BC-4)
15-May-2017 16-May-2017 2:00 PM 17-May-2017 A Approved Closed

Zone 4B /
762 KHEP-CI-762 Compaction test excavated formation level bottom of Foundation
C79 (BC-4)
15-May-2017 16-May-2017 3:00 PM 17-May-2017 A Approved Closed

Second Coat, Damproofing Intallation Inspection For RC Footing & Cluster 45,
763 KHEP-CI-763
Column Neck A6
16-May-2017 17-May-2017 2:30 PM 18-May-2017 A Approved Closed

Concrete sampling, testing and placement inspection for RC Column


764 KHEP-CI-764
neck
Cluster 61, B2 16-May-2017 17-May-2017 9:30 AM 17-May-2017 A Approved Closed

765 KHEP-CI-765 Cast in Place Concrete formwork inspection For RC Footing Cluster 48, B2 16-May-2017 17-May-2017 2:30 PM 18-May-2017 A Approved Closed

Installation of reinforcing steel bar embedded item and form closure


766 KHEP-CI-766
inspection for RC Footing
Cluster 48, B2 16-May-2017 17-May-2017 2:30 PM 18-May-2017 A Approved Closed

767 KHEP-CI-767 Cast in Place Concrete formwork inspection For RC Footing Cluster 31, B2 16-May-2017 17-May-2017 3:00 PM 17-May-2017 A Approved Closed

Installation of reinforcing steel bar embedded item and form closure


768 KHEP-CI-768
inspection for RC Footing
Cluster 31, B2 16-May-2017 17-May-2017 3:00 PM 17-May-2017 A Approved Closed

769 KHEP-CI-769 Cast in Place Concrete formwork inspection For RC Column Neck Cluster 35, B2 16-May-2017 17-May-2017 3:00 PM 18-May-2017 A Approved Closed

Cluster 46,
770 KHEP-CI-770 Dam proofing surface Preparation for RC Foundation & Column Neck
A6
16-May-2017 17-May-2017 2:30 PM 17-May-2017 A Approved Closed

40cm, CMU, Mortar and Masonry Inspection Under Exterior


771 KHEP-CI-771
Reinforced G.B
Cluster 13 B2 NA 16-May-2017 17-May-2017 2:30 PM 20-May-2017 A Approved Closed

40cm, CMU, Mortar and Masonry Inspection Under Exterior


772 KHEP-CI-772
Reinforced G.B
Cluster 15 B2 NA 16-May-2017 17-May-2017 2:30 PM 20-May-2017 A Approved Closed

40cm, CMU, Mortar and Masonry Inspection Under Exterior


773 KHEP-CI-773
Reinforced G.B
Cluster 14 B2 NA 16-May-2017 17-May-2017 2:30 PM 20-May-2017 A Approved Closed

First Coat, Damproofing Installation Inspection for RC footing & Cluster 65,
774 KHEP-CI-774
column neck A6
16-May-2017 17-May-2017 2:30 PM 21-May-2017 E Rejected Closed

First Coat, Damp Proofing Installation Inspection for RC Footing & Cluster 65,
774.1 KHEP-CI-774-01
column neck A6
22-May-2017 23-May-2017 2:30 PM 24-May-2017 E Rejected Closed

First Coat, Damp Proofing Installation Inspection for RC Footing & Cluster 65,
774.2 KHEP-CI-774-02
column neck A6
27-May-2017 28-May-2017 9:00 AM 28-May-2017 A Approved Closed

Zone 4B /
775 KHEP-CI-775 Compaction test excavated formation level bottom of Foundation Cluster 78 16-May-2017 17-May-2017 3:00 PM 21-May-2017 E Rejected Closed
(BC-4)
Zone 4B,
775.1 KHEP-CI-775-01 Compaction test excavated formation level bottom of Foundation Cluster 78 BC 3-Jun-2017 4-Jun-2017 9:00 AM 5-Jun-2017 A Approved Closed
4
Main Line:
From MH3-
L03~MH2-
L03
Length(12.1M
) Main
Line: From
MH2-
L03~MH1-
L03
Length(34.46
776 KHEP-CI-776 Installation of Sanitary Sewer uPVC pipes 200mm, Class 4 M) Main 16-May-2017 17-May-2017 10:00 AM 18-May-2017 E Rejected Closed
Line: From
MH1-
L03~MH1A-
L03
Length(16.44
m) Main Line:
From MH1A-
L03~MH5-
L01
Length(25.42
M)

Main Line:
From MH3-
L03~MH2-
L03
Length(12.1M
) Main
Line: From
MH2-
L03~MH1-
L03
Length(34.46
Approved w/
776.1 KHEP-CI-776-01 Installation of Sanitary Sewer uPVC pipes 200mm, Class 4 M) Main 18-May-2017 20-May-2017 10:00 AM 21-May-2017 B comments
Closed
Line: From
MH1-
L03~MH1A-
L03
Length(16.44
m) Main Line:
From MH1A-
L03~MH5-
L01
Length(25.42
M)

Main Line:
From MH1-
L03~MH1-
L04
Length(22.6M
) Main
777 KHEP-CI-777 Installation of Sanitary Sewer uPVC pipes 200mm, Class 4
Line: From
16-May-2017 17-May-2017 10:00 AM 18-May-2017 E Rejected Closed
MH1-
L04~MH2-
L04
Length(23.12
M)
Main Line:
From MH1-
L03~MH1-
L04
Length(22.6M
) Main Approved w/
777.1 KHEP-CI-777-01 Installation of Sanitary Sewer uPVC pipes 200mm, Class 4
Line: From
18-May-2017 20-May-2017 10:00 AM 22-May-2017 B comments
Closed
MH1-
L04~MH2-
L04
Length(23.12
M)

Main Line:
From MH1-
L04~MH1-
L05
Length(5.9M)
778 KHEP-CI-778 Installation of Sanitary Sewer uPVC pipes 200mm, Class 4 Main Line: 16-May-2017 17-May-2017 10:00 AM 18-May-2017 E Rejected Closed
From MH1-
L05~MH2-
L05
Length(17.13
M)

Main Line:
From MH1-
L04~MH1-
L05
Length(5.9M)
Approved w/
778.1 KHEP-CI-778-01 Installation of Sanitary Sewer uPVC pipes 200mm, Class 4 Main Line: 18-May-2017 20-May-2017 10:00 AM 22-May-2017 B comments
Closed
From MH1-
L05~MH2-
L05
Length(17.13
M)

Second Coat, Dam proofing Installation Inspection For RC Footing & Cluster 44, Approved w/
779 KHEP-CI-779
Column Neck A6
17-May-2017 18-May-2017 10:30 AM 20-May-2017 B comments
Closed

Second Coat, Dam proofing Installation Inspection For RC Footing & Cluster 65,
780 KHEP-CI-780
Column Neck A6
17-May-2017 18-May-2017 2:30 PM 20-May-2017 E Rejected Closed

Second Coat, Damp Proofing Installation Inspection For RC Footing & Cluster 65,
780.1 KHEP-CI-780-1
Column Neck A6
23-May-2017 24-May-2017 10:30 AM 24-May-2017 E Rejected Closed

Second Coat, Damp Proofing Installation Inspection For RC Footing & Cluster 65,
780.2 KHEP-CI-780-2
Column Neck A6
28-May-2017 29-May-2017 9:30 AM 30-May-2017 A Approved Closed

Termite control surface preparation, installation and final inspection Cluster 21,
781 KHEP-CI-781
for PC foundation BC4
17-May-2017 18-May-2017 10:30 AM 20-May-2017 A Approved Closed

Blinding concrete sampling, testing & placement inspection for Cluster 21,
782 KHEP-CI-782
Footing BC4
17-May-2017 18-May-2017 1:30 PM 20-May-2017 A Approved Closed

783 KHEP-CI-783 Dam proofing surface Preparation for RC Foundation & Column Neck Cluster 71, B2 17-May-2017 18-May-2017 2:30 PM 20-May-2017 A Approved Closed

40cm, CMU, Mortar and Masonry Inspection Under Exterior


784 KHEP-CI-784
Reinforced G.B
Cluster 12 B2 NA 17-May-2017 18-May-2017 2:30 PM 20-May-2017 A Approved Closed

Installation of reinforcing steel bar embedded item and form closure


785 KHEP-CI-785
inspection for RC Column (Ground Floor)
Cluster 01 A6 NA 17-May-2017 18-May-2017 2:30 PM 21-May-2017 E Rejected Closed

Installation of reinforcing steel bar embedded item and form closure


785 KHEP-CI-785-01
inspection for RC Column (Ground Floor)
Cluster 01 A6 NA 28-May-2017 29-May-2017 8:30 AM 30-May-2017 A Approved Closed

Zone 1B /
786 KHEP-CI-786 Compaction test 1st and final layer structural fill(Selected fill) Cluster-09 17-May-2017 18-May-2017 3:00 PM 21-May-2017 A Approved Closed
(BC-4)

Zone 1B Line
(34)
787 KHEP-CI-787 Inspection of excavated formation for pipe trench-swear Maine line
MH(2-L34) to
17-May-2017 18-May-2017 3:00 PM 20-May-2017 A Approved Closed
MH (1A-L34)
Zone 1B Line
(08) Approved w/
788 KHEP-CI-788 Inspection of Sand Filling Around pipe - swear Maine line
MH(4-L08) to
17-May-2017 18-May-2017 3:00 PM 21-May-2017 B comments
Closed
MH (3-L08)

Main Line:
From MH1-
L07 ~ MH3-
Approved w/
789 KHEP-CI-789 Inspection of Leak Test for Sanitary uPVC Pipes 200mm - Class 4 L08 Main 17-May-2017 18-May-2017 11:00 AM 20-May-2017 B comments
Closed
Line: From
MH1-L06 ~
MH2-L08
Main Line:
From MH3-
L08 ~ MH2-
Approved w/
790 KHEP-CI-790 Inspection of Leak Test for Sanitary uPVC Pipes 200mm - Class 4 L08 Main 17-May-2017 18-May-2017 11:00 AM 20-May-2017 B comments
Closed
Line: From
MH2-L08 ~
MH1-L08
Zone 1B Line
(34)
791 KHEP-CI-791 Inspection of excavated formation for pipe trench-swear Maine line MH(1A-L34) 17-May-2017 18-May-2017 3:00 PM 20-May-2017 A Approved Closed
to MH (7-
L02)
Concrete sampling, testing and placement inspection for RC Grad
792 KHEP-CI-792
Beam
Cluster 01 A6 NA 18-May-2017 20-May-2017 9:30 AM 20-May-2017 A Approved Closed

Concrete sampling, testing and placement inspection for RC Column Cluster 6,


793 KHEP-CI-793
neck BC4
18-May-2017 20-May-2017 9:30 AM 20-May-2017 A Approved Closed

Installation of reinforcing steel bar embedded item and form closure


794 KHEP-CI-794
inspection for RC Column Neck
Cluster 48, B2 18-May-2017 20-May-2017 2:30 PM 21-May-2017 A Approved Closed

40cm, CMU, Mortar and Masonry Inspection Under Exterior


795 KHEP-CI-795
Reinforced G.B
Cluster 5, B2 18-May-2017 20-May-2017 2:30 PM 21-May-2017 A Approved Closed

40cm, CMU, Mortar and Masonry Inspection Under Exterior


796 KHEP-CI-796
Reinforced G.B
Cluster 10 B2 NA 18-May-2017 20-May-2017 2:30 PM 21-May-2017 A Approved Closed

797 KHEP-CI-797 Dam proofing surface Preparation for RC Foundation & Column Neck Cluster 51, B2 18-May-2017 20-May-2017 2:30 PM 22-May-2017 A Approved Closed

798 KHEP-CI-798 Dam proofing surface Preparation for RC Foundation & Column Neck Cluster 52, B2 18-May-2017 20-May-2017 2:30 PM 21-May-2017 A Approved Closed

799 KHEP-CI-799 Concrete sampling, testing and placement inspection for RC Footing Cluster 48, B2 18-May-2017 20-May-2017 9:30 AM 20-May-2017 A Approved Closed

Main Line:
From MH1-
800 KHEP-CI-800 Installation of Sanitary Sewer uPVC pipes 200mm, Class 4 L08 ~ MH7- 18-May-2017 20-May-2017 2:30 PM 22-May-2017 A Approved Closed
L01 Length
(21.15m)

Zone 1B Line
(33)
801 KHEP-CI-801 Inspection of excavated formation for pipe trench-swear Maine line
MH(1-L34) to
18-May-2017 20-May-2017 3:00 PM 21-May-2017 A Approved Closed
MH (7-L33)

Zone 4B /
802 KHEP-CI-802 Compaction test 1st and final layer structural fill(Selected fill) Cluster-79 18-May-2017 20-May-2017 3:00 PM 22-May-2017 A Approved Closed
(BC-4)

Road No:05
(sta 0+200 to
0+223)
803 KHEP-CI-803 Compaction test 6th layer (Final back filling) General Fill
(excluding
18-May-2017 20-May-2017 3:00 PM 21-May-2017 A Approved Closed
road 2
intersection)

Cluster 21,
804 KHEP-CI-804 Cast in Place Concrete formwork inspection For RC Footing
BC4
20-May-2017 21-May-2017 2:30 PM 22-May-2017 A Approved Closed

Installation of reinforcing steel bar embedded item and form closure Cluster 21,
805 KHEP-CI-805
inspection for RC Footing BC4
20-May-2017 21-May-2017 2:30 PM 22-May-2017 A Approved Closed

Installation of reinforcing steel bar embedded item and form closure


806 KHEP-CI-806
inspection for RC Column Neck
Cluster 31, B2 20-May-2017 21-May-2017 2:30 PM 22-May-2017 A Approved Closed
Termite control surface preparation, installation and final inspection Cluster 9,
807 KHEP-CI-807
for PC foundation BC4
20-May-2017 21-May-2017 10:30 AM 22-May-2017 A Approved Closed

Blinding concrete sampling, testing & placement inspection for Cluster 9,


808 KHEP-CI-808
Footing BC4
20-May-2017 21-May-2017 1:30 PM 24-May-2017 A Approved Closed

First Coat, Dam proofing Installation Inspection for RC footing & Cluster 46,
809 KHEP-CI-809
column neck A6
20-May-2017 21-May-2017 2:30 PM 22-May-2017 A Approved Closed

Cluster 69,
Installation of reinforcing steel bar embedded item and form closure
810 KHEP-CI-810
inspection for RC Column (First Floor)
B2 20-May-2017 21-May-2017 2:30 PM 22-May-2017 A Approved Closed
( Mockup)
Cluster 69,
Concrete sampling, testing and placement inspection for RC First
811 KHEP-CI-811
Floor Slab & 2nd Flight Stair
B2 20-May-2017 21-May-2017 9:30 AM 21-May-2017 A Approved Closed
( Mockup)

812 KHEP-CI-812 Concrete sampling, testing and placement inspection for RC Footing Cluster 31, B2 20-May-2017 21-May-2017 9:30 AM 21-May-2017 A Approved Closed

Concrete sampling, testing and placement inspection for RC Column


813 KHEP-CI-813
neck
Cluster 35, B2 20-May-2017 21-May-2017 9:30 AM 21-May-2017 A Approved Closed

Zone 1B Line
(08)
814 KHEP-CI-814 Inspection of Sand Bedding Around pipe - swear Maine line
MH(3-L08) to
20-May-2017 21-May-2017 3:00 PM 21-May-2017 A Approved Closed
MH (1-L08)

Zone 1B
MH(1-L07) to
MH (3-L08)
815 KHEP-CI-815 Inspection of Sand Bedding Around pipe - swear Maine line Line (07) 20-May-2017 21-May-2017 3:00 PM 21-May-2017 A Approved Closed
MH(1-L06) to
MH (2-L08)
Line (06)

Zone 1B Line
Compaction test of Sand Bedding Under Pipe Trench - Swear Maine (34)
816 KHEP-CI-816
Line MH(2-L34) to
20-May-2017 21-May-2017 3:00 PM 21-May-2017 A Approved Closed
MH (7-L02)

Compaction test 1st layer General fill (sta,0+000 to 0+117) Approved w/


817 KHEP-CI-817
(excluding Road 1 and 2 intersection)
Alley 04 NA 20-May-2017 21-May-2017 3:00 PM 22-May-2017 B comments
Closed

Compaction test 4th layer General fill (sta,0+000 to 0+108)


818 KHEP-CI-818
(excluding Ally 4 and 6 intersection)
Alley 14 20-May-2017 21-May-2017 3:00 PM 22-May-2017 A Approved Closed

Second Coat, Dam proofing installation inspection for RC Footing & Cluster 46,
819 KHEP-CI-819
Column Neck A6
21-May-2017 22-May-2017 2:30 PM 23-May-2017 A Approved Closed

Termite control surface preparation, installation & final inspection for Cluster 79,
820 KHEP-CI-820
PC Foundation BC4
21-May-2017 22-May-2017 10:30 AM 23-May-2017 A Approved Closed

Blinding concrete sampling, testing & placement inspection for Cluster 79,
821 KHEP-CI-821
Footing BC4
21-May-2017 22-May-2017 1:30 PM 24-May-2017 A Approved Closed

822 KHEP-CI-822 Cast in Place Concrete form work inspection For RC Column Neck Cluster 58, B2 21-May-2017 22-May-2017 2:30 PM 23-May-2017 A Approved Closed

823 KHEP-CI-823 Dam proofing surface Preparation for RC Foundation & Column Neck Cluster 30, B2 21-May-2017 22-May-2017 2:30 PM 23-May-2017 A Approved Closed

824 KHEP-CI-824 Dam proofing surface Preparation for RC Foundation & Column Neck Cluster 27, B2 21-May-2017 22-May-2017 2:30 PM 23-May-2017 A Approved Closed

40cm, CMU, Mortar and Masonry Inspection Under Exterior


825 KHEP-CI-825
Reinforced G.B
Cluster 14 B2 NA 21-May-2017 22-May-2017 2:30 PM 23-May-2017 A Approved Closed

Zone 1B Line
(33)
MH(1-L33) to
Compaction test of Sand Bedding Under Pipe Trench - Swear Maine
826 KHEP-CI-826
Line
MH (A1-L33) 21-May-2017 22-May-2017 3:00 PM 23-May-2017 A Approved Closed
MH(A1-L33)
to MH (A1-
L34)

Zone 1B Line
Compaction test of Sand Bedding Under Pipe Trench - Swear Maine (08)
827 KHEP-CI-827
Line MH(4-L08) to
21-May-2017 22-May-2017 3:00 PM 23-May-2017 E Rejected Closed
MH (1-L08)
Zone 1B Line
Compaction test of Sand Bedding Under Pipe Trench - Swear Maine (08) Approved w/
827.1 KHEP-CI-827-01
Line MH(4-L08) to
5-Jun-2017 6-Jun-2017 10:00 AM 8-Jun-2017 B comments
Closed
MH (1-L08)

Zone 1B Line
(7 and 6)
Compaction test of Sand Bedding Under Pipe Trench - Swear Maine MH(1-L07) to
828 KHEP-CI-828
Line MH (3-L08)
21-May-2017 22-May-2017 3:00 PM 23-May-2017 E Rejected Closed
MH(1-L06) to
MH (2-L08)

Zone 1B Line
(7 and 6)
Compaction test of Sand Bedding Under Pipe Trench - Swear Maine MH(1-L07) to Approved w/
828.1 KHEP-CI-828-01
Line MH (3-L08)
5-Jun-2017 6-Jun-2017 10:00 AM 8-Jun-2017 B comments
Closed
MH(1-L06) to
MH (2-L08)

Compaction test and Formation Existing Level (sta,0+000 to 0+114)


829 KHEP-CI-829
(excluding Road 4 and 1 intersection)
Alley 05 NA 21-May-2017 22-May-2017 3:00 PM 23-May-2017 A Approved Closed

Bitumen Painting for CMU, Mortar and Masonry inspection under


830 KHEP-CI-830
exterior reinforced G.B
Cluster 12 B2 NA 22-May-2017 23-May-2017 2:30 PM 24-May-2017 A Approved Closed

Bitumen Painting for CMU, Mortar and Masonry inspection under


831 KHEP-CI-831
exterior reinforced G.B
Cluster 13 B2 NA 22-May-2017 23-May-2017 2:30 PM 24-May-2017 A Approved Closed

Bitumen Painting for CMU, Mortar and Masonry inspection under


832 KHEP-CI-832
exterior reinforced G.B
Cluster 15 B2 NA 22-May-2017 23-May-2017 2:30 PM 24-May-2017 A Approved Closed

Zone 4B,
833 KHEP-CI-833 Compaction test 1st and final layer structural fill(Selected fill) Cluster 78 22-May-2017 23-May-2017 3:00 PM 25-May-2017 A Approved Closed
(BC-4)
Compaction test 2nd layer General fill (sta,0+025 to 0+117)
834 KHEP-CI-834
(excluding Road 2 intersection)
Alley 04 NA 22-May-2017 23-May-2017 3:00 PM 24-May-2017 A Approved Closed

Compaction test and Formation Existing Level (sta,0+000 to 0+025)


835 KHEP-CI-835
(excluding Road 1 intersection)
Alley 04 NA 22-May-2017 23-May-2017 3:00 PM 24-May-2017 A Approved Closed

Compaction test 5th layer General fill (sta,0+000 to 0+108)


836 KHEP-CI-836
(excluding Ally 4 and 6 intersection)
Alley 14 22-May-2017 23-May-2017 3:00 PM 25-May-2017 A Approved Closed

Compaction test 1st layer General fill (sta,0+100 to 0+155)


837 KHEP-CI-837
(excluding Road 2 intersection)
Alley 06 NA 22-May-2017 23-May-2017 3:00 PM 24-May-2017 E Rejected Closed

Compaction test 1st layer General fill (sta,0+100 to 0+155)


837.1 KHEP-CI-837-01
(excluding Road 2 intersection)
Alley 06 NA 25-May-2017 27-May-2017 10:15 AM 28-May-2017 A Approved Closed

Maine Line
MH (1-L03)
to MH (A1-
L03) Line 3
MH (2-L04) Approved w/
838 KHEP-CI-838 Inspection of Sand Filling Around pipe - swear Maine line
to MH (A1-
22-May-2017 23-May-2017 3:00 PM 24-May-2017 B comments
Closed
L04) Line 4
MH (1-L04)
to MH (A1-
L03) Line 4
Maine Line
MH (2-L05)
to MH (1-
L05) Line 5 Approved w/
839 KHEP-CI-839 Inspection of Sand Filling Around pipe - swear Maine line
MH (1-
22-May-2017 23-May-2017 3:00 PM 24-May-2017 B comments
Closed
L05) to MH
(1-L04) Line
5
Zone 1B Line
15
MH(52-L15)
840 KHEP-CI-840 Inspection of Excavated Formation for Pipe Trench Storm Maine Line to MH (54- 22-May-2017 23-May-2017 3:00 PM 24-May-2017 E Rejected Closed
L15) MH(54-
L15) to MH
(57-L15)
Zone 1B Line
15
MH(52-L15)
840.1 KHEP-CI-840-01 Inspection of Excavated Formation for Pipe Trench Storm Maine Line to MH (54- 25-May-2017 27-May-2017 10:00 AM 27-May-2017 A Approved Closed
L15) MH(54-
L15) to MH
(57-L15)
Second Coat, Damp Proofing Installation Inspection For RC Footing &
841 KHEP-CI-841
Column Neck
Cluster 51, B2 23-May-2017 24-May-2017 2:30 PM 25-May-2017 A Approved Closed

Second Coat, Damp Proofing Installation Inspection For RC Footing &


842 KHEP-CI-842
Column Neck
Cluster 52, B2 23-May-2017 24-May-2017 2:30 PM 25-May-2017 A Approved Closed

Cast in Place Concrete form work inspection For RC Column Neck Cluster 16 Approved w/
843 KHEP-CI-843
Excluding Grid Line (B-6) & (H-7) BC4
NA 23-May-2017 24-May-2017 3:00 PM 25-May-2017 B comments
Closed

Cluster 9,
844 KHEP-CI-844 Cast in Place Concrete form work inspection For RC Column Neck
BC4
23-May-2017 24-May-2017 2:30 PM 25-May-2017 A Approved Closed

Installation of reinforcing steel bar embedded item and form closure Cluster 9,
845 KHEP-CI-845
inspection for RC Footing BC4
23-May-2017 24-May-2017 2:30 PM 25-May-2017 A Approved Closed

40cm, CMU, Mortar and Masonry Inspection Under Exterior


846 KHEP-CI-846
Reinforced G.B
Cluster 68, B2 23-May-2017 24-May-2017 2:30 PM 25-May-2017 A Approved Closed

Cluster 21,
847 KHEP-CI-847 Concrete sampling, testing and placement inspection for RC Footing
BC4
23-May-2017 24-May-2017 9:30 AM 24-May-2017 A Approved Closed

Zone 1B Line
7
MH(19-L07)
848 KHEP-CI-848 Inspection of excavated formation for pipe trench - Storm Maine line to MH (20- 23-May-2017 24-May-2017 10:00 AM 25-May-2017 A Approved Closed
L07) MH(20-
L07) to MH
(27-L07)

MH (3-L03)
to MH (2-
L03) Line 3
MH (2-L03)
to MH (1-
849 KHEP-CI-849 Inspection of Sand Filling Around pipe - swear Maine line
L03) Line 3
23-May-2017 24-May-2017 10:30 AM 25-May-2017 A Approved Closed
MH (A1-
L03) to MH
(5-L01) Line
3
MH (1-L08)
850 KHEP-CI-850 Inspection of Sand Filling Around pipe - swear Maine line to MH (7- 23-May-2017 24-May-2017 1:30 PM 25-May-2017 A Approved Closed
L01) Line 8
Compaction test 1st layer General fill (sta,0+000 to 0+200)
851 KHEP-CI-851
(excluding Road 1 and 4 intersection)
Alley 05 NA 23-May-2017 24-May-2017 2:00 PM 25-May-2017 A Approved Closed

Compaction test and Formation Existing Level (sta,0+000 to 0+112) Approved w/


852 KHEP-CI-852
(excluding Road Ally 7 and 5 intersection)
Alley 15 23-May-2017 24-May-2017 3:00 PM 25-May-2017 B comments
Closed

Zone 1B Line
15
MH(57-L15)
Compaction test of Sand Bedding Under Pipe Trench - Swear Maine
853 KHEP-CI-853
Line
to MH (54- 25-May-2017 27-May-2017 11:30 AM 28-May-2017 A Approved Closed
L15) MH(54-
L15) to MH
(52-L15)
Second Coat, Damp Proofing Installation Inspection for RC footing &
854 KHEP-CI-854
column neck
Cluster 51, B2 24-May-2017 25-May-2017 1:30 PM 27-May-2017 A Approved Closed

Second Coat, Damp Proofing Installation Inspection for RC footing &


855 KHEP-CI-855
column neck
Cluster 52, B2 24-May-2017 25-May-2017 2:00 PM 27-May-2017 A Approved Closed

Second Coat, Damp Proofing Installation Inspection for Cmu, Mortar


856 KHEP-CI-856
and Masonry Inspection Under Exterior Reinforced G.B
Cluster 12 B2 NA 24-May-2017 25-May-2017 2:30 PM 27-May-2017 A Approved Closed

Second Coat, Damp Proofing Installation Inspection for Cmu, Mortar


857 KHEP-CI-857
and Masonry Inspection Under Exterior Reinforced G.B
Cluster 13 B2 NA 24-May-2017 25-May-2017 3:00 PM 27-May-2017 A Approved Closed

Second Coat, Damp Proofing Installation Inspection for Cmu, Mortar


858 KHEP-CI-858
and Masonry Inspection Under Exterior Reinforced G.B
Cluster 15 B2 NA 24-May-2017 25-May-2017 2:00 PM 27-May-2017 A Approved Closed
Cast in Place Concrete form work inspection For RC Column (First Cluster 69,
859 KHEP-CI-859
Floor) B2 ( Mockup)
24-May-2017 25-May-2017 10:00 AM 27-May-2017 A Approved Closed

Damp Proofing surface Preparation for RC Foundation & Column


860 KHEP-CI-860
Neck
Cluster 33, B2 24-May-2017 25-May-2017 3:30 PM 27-May-2017 A Approved Closed

Compaction test 6th layer General fill (sta,0+000 to 0+108)


861 KHEP-CI-861
(excluding Ally 4 and 6 intersection)
Alley 14 24-May-2017 25-May-2017 2:00 PM 27-May-2017 A Approved Closed

Compaction test 3rd layer General fill (sta,0+025 to 0+117)


862 KHEP-CI-862
(excluding Road 2 intersection)
Alley 04 NA 24-May-2017 25-May-2017 3:00 PM 27-May-2017 A Approved Closed

Compaction test 1st layer General fill (sta,0+000 to 0+025)


863 KHEP-CI-863
(excluding Road 1 intersection)
Alley 04 NA 24-May-2017 25-May-2017 2:00 PM 27-May-2017 A Approved Closed

Compaction test and Formation Existing Level (sta,0+000 to 0+100)


864 KHEP-CI-864
(excluding Road 1 intersection)
Alley 06 NA 24-May-2017 25-May-2017 2:00 PM 27-May-2017 A Approved Closed

MH (2-L34)
to MH (1-
L34) Line 34
MH (1-L34)
865 KHEP-CI-865 Inspection of Sand Filling Around pipe - swear Maine line to MH (A1- 24-May-2017 25-May-2017 1:30 PM 27-May-2017 A Approved Closed
L34) Line 34
MH (A1-L34)
to MH (7-
L02) Line 34

Zone 4B,
866 KHEP-CI-866 Compaction test Excavated Formation Level Bottom of Foundation Cluster 23, 24-May-2017 25-May-2017 3:00 PM 27-May-2017 E Rejected Closed
BC 4
Zone 4B,
866.1 KHEP-CI-866-01 Compaction test Excavated Formation Level Bottom of Foundation Cluster 23, 30-May-2017 31-May-2017 3:00 PM 3-Jun-2017 A Approved Closed
BC 4
Zone 2B,
867 KHEP-CI-867 Compaction test Excavated Formation Level Bottom of Foundation Cluster 24, 24-May-2017 25-May-2017 2:30 PM 27-May-2017 E Rejected Closed
BC 4
Zone 2B,
867 KHEP-CI-867-01 Compaction test Excavated Formation Level Bottom of Foundation Cluster 24, 28-May-2017 29-May-2017 10:30 AM 30-May-2017 A Approved Closed
BC 4
Zone 1B Line
7
MH(28-L07)
to MH (29-
868 KHEP-CI-868 Inspection of excavated formation for pipe trench - Storm Maine line
L07)
24-May-2017 25-May-2017 11:00 AM 27-May-2017 E Rejected Closed
MH(A29-L07)
to MH (30-
L04)

Zone 1B, Line


7
MH(28-L07)
to MH (29-
868.1 KHEP-CI-868-01 Inspection of excavated formation for pipe trench - Storm Maine line
L07)
28-May-2017 29-May-2017 9:00 AM 31-May-2017 A Approved Closed
MH(A29-L07)
to MH (30-
L04)
Installation of reinforcing steel bar embedded item and form closure Cluster 16 BC
869 KHEP-CI-869
inspection for RC Column Neck Grid Line (B -6 & H -6) 4
NA 25-May-2017 27-May-2017 7:30 AM 27-May-2017 A Approved Closed

Concrete sampling, Testing and placement inspection for RC Column Cluster 69, B
870 KHEP-CI-870
(Filst Floor) 2 (Mockup)
25-May-2017 27-May-2017 9:30 AM 27-May-2017 A Approved Closed

Damp Proofing surface Preparation for RC Foundation & Column Cluster 34, B Approved w/
871 KHEP-CI-871
Neck 2
25-May-2017 27-May-2017 9:00 AM 28-May-2017 B comments
Closed

First Coat, Damp Proofing Installation Inspection for RC footing & Cluster 27, B Approved w/
872 KHEP-CI-872
column neck 2
25-May-2017 28-May-2017 9:30 AM 28-May-2017 B comments
Closed

First Coat, Damp Proofing Installation Inspection for RC footing & Cluster 30, B Approved w/
873 KHEP-CI-873
column neck 2
25-May-2017 27-May-2017 9:00 AM 28-May-2017 B comments
Closed

First Coat, Damp Proofing Installation Inspection for Cmu, Mortar Approved w/
874 KHEP-CI-874
and Masonry Inspection Under Exterior Reinforced G.B
Cluster 10 B2 NA 25-May-2017 28-May-2017 9:00 AM 28-May-2017 B comments
Closed
First Coat, Damp Proofing Installation Inspection for Cmu, Mortar Approved w/
875 KHEP-CI-875
and Masonry Inspection Under Exterior Reinforced G.B
Cluster 5, B 2 25-May-2017 28-May-2017 9:30 AM 28-May-2017 B comments
Closed

Termite control surface preparation, installation and final inspection Cluster 78,
876 KHEP-CI-876
for PC foundation BC 4
25-May-2017 27-May-2017 9:30 AM 28-May-2017 A Approved Closed

Blinding concrete sampling, Testing & placement inspection for Cluster 78,
877 KHEP-CI-877
Footing BC 4
25-May-2017 27-May-2017 10:30 PM 30-May-2017 A Approved Closed

Installation of reinforcing steel bar embedded item and form closure Cluster 9, BC
878 KHEP-CI-878
inspection for RC Column Neck 4
25-May-2017 27-May-2017 8:30 AM 27-May-2017 A Approved Closed

Installation of reinforcing steel bar embedded item and form closure Cluster 21,
879 KHEP-CI-879
inspection for RC Column Neck BC 4
25-May-2017 27-May-2017 9:00 AM 27-May-2017 A Approved Closed

MH (19-L07)
to MH (20-
Compaction test of Sand Bedding Under Pipe Trench - Storm Maine L07) Line 7
880 KHEP-CI-880
Line MH (20-L07)
25-May-2017 27-May-2017 10:30 AM 28-May-2017 A Approved Closed
to MH (27-
L07) Line 7

MH (1-L33)
to MH (1-
L33) Line 33
881 KHEP-CI-881 Inspection of Sand Filling Around pipe - swear Maine line
MH (1A-L33)
25-May-2017 27-May-2017 9:30 AM 27-May-2017 A Approved Closed
to MH (1-
L34) Line 33

Cast in Place Concrete form work inspection For RC Column Neck Cluster 6, BC
882 KHEP-CI-882
Grid Line (B - 6 & H - 6) 4
25-May-2017 27-May-2017 8:00 AM 27-May-2017 A Approved Closed

Zone 1B Line
31
MH(9-L02) to
883 KHEP-CI-883 Inspection of excavated formation for pipe trench - Storm Maine line MH(A1-L31) 27-May-2017 28-May-2017 11:00 AM 28-May-2017 E Rejected Closed
MH(A1-L31)
to MH (1-
L31)
Zone 1B Line
31
MH(9-L02) to
883.1 KHEP-CI-883-01 Inspection of excavated formation for pipe trench - Storm Maine line MH(A1-L31) 29-May-2017 30-May-2017 10:00 AM 31-May-2017 A Approved Closed
MH(A1-L31)
to MH (1-
L31)
Cluster 9, BC
884 KHEP-CI-884 Concrete sampling, testing and placement inspection for RC Footing
4
27-May-2017 28-May-2017 9:30 AM 28-May-2017 A Approved Closed

Concrete sampling, testing and placement inspection for RC Column Cluster 58, B
885 KHEP-CI-885
neck 2
27-May-2017 28-May-2017 10:00 AM 28-May-2017 A Approved Closed

Concrete sampling, testing and placement inspection for RC Column Cluster 16


886 KHEP-CI-886
neck BC4
NA 27-May-2017 28-May-2017 10:30 AM 28-May-2017 A Approved Closed

Installation of reinforcing steel bar embedded item and form closure Cluster 79,
887 KHEP-CI-887
inspection for RC Footing BC 4
28-May-2017 29-May-2017 10:00 AM 30-May-2017 A Approved Closed

40cm, CMU, Mortar and Masonry Inspection Under Exterior


888 KHEP-CI-888
Reinforced G.B
Cluster 11 B2 NA 28-May-2017 29-May-2017 9:00 AM 30-May-2017 E Rejected Closed

40cm, CMU, Mortar and Masonry Inspection Under Exterior


888.1 KHEP-CI-888-01
Reinforced G.B
Cluster 11 B2 NA 1-Jun-2017 3-Jun-2017 9:00 AM 5-Jun-2017 A Approved Closed

Cluster 79,
889 KHEP-CI-889 Cast in Place Concrete form work inspection For RC Footing
BC 4
28-May-2017 29-May-2017 10:30 AM 30-May-2017 A Approved Closed

890 KHEP-CI-890 Cast in place concrete Form work inspection for RC Grad Beam Cluster 02 A6 NA 29-May-2017 30-May-2017 10:30 AM 30-May-2017 A Approved Closed

Cluster 48, B
891 KHEP-CI-891 Cast in place concrete Form work inspection for RC Column Neck
2
29-May-2017 30-May-2017 9:30 AM 30-May-2017 A Approved Closed

Zone 1B Line
31
MH(1-L31) to
892 KHEP-CI-892 Inspection of excavated formation for pipe trench - Swear Maine line
MH(2-L31)
29-May-2017 30-May-2017 11:00 AM 31-May-2017 A Approved Closed
MH(1-L31) to
MH (1-L32)
Road 3
(sta,0+300 to
0+425)
893 KHEP-CI-893 Compaction test and Formation Existing Level
(excluding
29-May-2017 30-May-2017 9:30 AM 1-Jun-2017 E Rejected Closed
Road 2
intersection)

Road 3
(sta,0+300 to
0+425)
893.1 KHEP-CI-893-01 Compaction test and Formation Existing Level
(excluding
4-Jun-2017 5-Jun-2017 11:30 AM 6-Jun-2017 A Approved Closed
Road 2
intersection)

Compaction test 4th layer General fill (sta,0+075 to 0+114)


894 KHEP-CI-894
(excluding Road 2 intersection)
Alley 04 NA 29-May-2017 30-May-2017 10:00 AM 30-May-2017 A Approved Closed

Second Coat, Damp Proofing Installation Inspection for RC Footing Cluster 30, B
895 KHEP-CI-895
& column neck 2
30-May-2017 31-May-2017 9:00 AM 1-Jun-2017 A Approved Closed

Second Coat, Damp Proofing Installation Inspection for Cmu, Mortar


896 KHEP-CI-896
and Masonry Inspection Under Exterior Reinforced G.B
Cluster 10 B2 NA 30-May-2017 31-May-2017 9:00 AM 31-May-2017 A Approved Closed

Second Coat, Damp Proofing Installation Inspection for Cmu, Mortar


897 KHEP-CI-897
and Masonry Inspection Under Exterior Reinforced G.B
Cluster 5, B 2 30-May-2017 31-May-2017 10:00 AM 31-May-2017 A Approved Closed

First Coat, Damp Proofing Installation Inspection for Cmu, Mortar


898 KHEP-CI-898
and Masonry Inspection Under Exterior Reinforced G.B
Cluster 14 B2 NA 30-May-2017 31-May-2017 8:00 AM 31-May-2017 A Approved Closed

Second Coat, Damp Proofing Installation Inspection for RC Footing Cluster 27, B
899 KHEP-CI-899
& column neck 2
30-May-2017 31-May-2017 8:30 AM 1-Jun-2017 A Approved Closed

40cm, CMU, Mortar and Masonry Inspection Under Exterior Cluster 81,
900 KHEP-CI-900
Reinforced G.B A6
30-May-2017 1-Jun-2017 10:00 AM 3-Jun-2017 E Rejected Closed

40cm, CMU, Mortar and Masonry Inspection Under Exterior Cluster 81,
900.1 KHEP-CI-900-01
Reinforced G.B A6
7-Jun-2017 8-Jun-2017 10:00 AM 8-Jun-2017 A Approved Closed

MH (3-L31)
to MH (2-
L31) and MH
(2-L31) to
MH (1-L31)
Line 31 MH
Compaction test of Sand Bedding Under Pipe Trench - Swear Maine (1-L31) to
901 KHEP-CI-901
Line MH (A1-L31)
30-May-2017 31-May-2017 10:30 AM 1-Jun-2017 E Rejected Closed
and MH (A1-
L31) to MH
(9-L02) Line
31 MH (1-L32
to MH (1-
L31) Line 32

MH (3-L31)
to MH (2-
L31) and MH
(2-L31) to
MH (1-L31)
Line 31 MH
Compaction test of Sand Bedding Under Pipe Trench - Swaer Maine (1-L31) to
901.1 KHEP-CI-901-01
Line MH (A1-L31)
3-Jun-2017 4-Jun-2017 10:30 AM 4-Jun-2017 A Approved Closed
and MH (A1-
L31) to MH
(9-L02) Line
31 MH (1-L32
to MH (1-
L31) Line 32
MH (28-L07)
to MH (29-
L07) Line 7
MH (28-L07)
Compaction test of Sand Bedding Under Pipe Trench - Storm Maine to MH (29A-
902 KHEP-CI-902
Line L07) Line 7
30-May-2017 31-May-2017 10:30 AM 3-Jun-2017 A Approved Closed
MH (29A-
L07) to MH
(30-L04) Line
7

Compaction test and Formation Existing Level (sta,0+100 to 0+225)


903 KHEP-CI-903
(excluding Road 2 intersection)
Alley 08 NA 30-May-2017 31-May-2017 9:30 AM 1-Jun-2017 A Approved Closed

Compaction test 2nd layer General fill (sta,0+100 to 0+155)


904 KHEP-CI-904
(excluding Road 2 intersection)
Alley 06 NA 30-May-2017 31-May-2017 10:15 AM 1-Jun-2017 A Approved Closed

Concrete sampling, testing and placement inspection for RC Grad


905 KHEP-CI-905
Beam
Cluster 02 A6 NA 31-May-2017 1-Jun-2017 9:30 AM 1-Jun-2017 A Approved Closed

Second Coat, Damp Proofing Installation Inspection for Cmu, Mortar


906 KHEP-CI-906
and Masonry Inspection Under Exterior Reinforced G.B
Cluster 14 B2 NA 31-May-2017 1-Jun-2017 9:00 AM 1-Jun-2017 A Approved Closed

Cast in place concrete Form work inspection for RC Column Axis Approved w/
907 KHEP-CI-907
(H,J,K,L,M,N)
Cluster 01 A6 NA 31-May-2017 1-Jun-2017 10:00 AM 3-Jun-2017 B comments
Closed

Zone 2B,
908 KHEP-CI-908 Compaction test 1st and final layer structural fill (selected fill) Cluster 24, 31-May-2017 1-Jun-2017 10:00 AM 1-Jun-2017 E Rejected Closed
BC 4
Zone 2B,
908.1 KHEP-CI-908-01 Compaction test 1st and final layer structural fill (selected fill) Cluster 24, 3-Jun-2017 4-Jun-2017 10:00 AM 5-Jun-2017 A Approved Closed
BC 4
Cluster 79,
909 KHEP-CI-909 Concrete sampling, testing and placement inspection for RC Footing
BC4
1-Jun-2017 3-Jun-2017 9:30 AM 3-Jun-2017 A Approved Closed

Concrete sampling, testing and placement inspection for RC Column


910 KHEP-CI-910
neck
Cluster 48, B2 1-Jun-2017 3-Jun-2017 9:00 AM 3-Jun-2017 A Approved Closed

First Coat, Damp Proofing Installation Inspection for RC Footing & Cluster 43,
911 KHEP-CI-911
column neck A6
1-Jun-2017 3-Jun-2017 10:00 AM 3-Jun-2017 A Approved Closed

Zone 1B Line
15
912 KHEP-CI-912 Inspection of excavated formation for pipe trench - Storm Maine line MH(46-L15) 1-Jun-2017 3-Jun-2017 11:00 AM 4-Jun-2017 A Approved Closed
to MH(47-
L15)
MH(19-L07)
to MH(20-
L07) Line 7 Approved w/
913 KHEP-CI-913 Inspection of Sand Filling Around pipe - Storm Maine line
MH(20-L07)
1-Jun-2017 3-Jun-2017 9:30 AM 4-Jun-2017 B comments
Closed
to MH(27-
L07) Line 7
Installation of reinforcing steel bar embedded item and form closure
914 KHEP-CI-914
inspection for RC Column Ground Floor
Cluster 02 A6 NA 1-Jun-2017 3-Jun-2017 10:00 AM 5-Jun-2017 E Rejected Closed

Installation of reinforcing steel bar embedded item and form closure Approved w/
914.1 KHEP-CI-914-01
inspection for RC Column Ground Floor
Cluster 02 A6 NA 10-Jun-2017 11-Jun-2017 10:00 AM 12-Jun-2017 B comments
Closed

Termite control surface preparation, installation and final inspection


915 KHEP-CI-915
for PC Grad beam
Cluster 12 B2 NA 3-Jun-2017 4-Jun-2017 10:30 AM 6-Jun-2017 A Approved Closed

Blinding concrete sampling, testing & placement inspection for grad


916 KHEP-CI-916
beam
Cluster 12 B2 NA 3-Jun-2017 4-Jun-2017 11:00 AM 6-Jun-2017 A Approved Closed

Termite control surface preparation, installation and final inspection


917 KHEP-CI-917
for PC Grad beam
Cluster 13 B2 NA 3-Jun-2017 4-Jun-2017 10:00 AM 6-Jun-2017 A Approved Closed

Blinding concrete sampling, testing & placement inspection for grad


918 KHEP-CI-918
beam
Cluster 13 B2 NA 3-Jun-2017 4-Jun-2017 11:30 AM 6-Jun-2017 A Approved Closed

Termite control surface preparation, installation and final inspection


919 KHEP-CI-919
for PC Grad beam
Cluster 15 B2 NA 3-Jun-2017 4-Jun-2017 10:00 AM 6-Jun-2017 A Approved Closed

Blinding concrete sampling, testing & placement inspection for grad


920 KHEP-CI-920
beam
Cluster 15 B2 NA 3-Jun-2017 4-Jun-2017 11:30 AM 6-Jun-2017 A Approved Closed

Zone 1B Line
15
Compaction test of Sand Bedding Under Pipe Trench - Storm Maine
921 KHEP-CI-921
Line
MH(46-L15) 3-Jun-2017 4-Jun-2017 11:00 AM 6-Jun-2017 A Approved Closed
to MH(47-
L15)
Compaction test 3rd layer General fill (sta,0+100 to 0+155)
922 KHEP-CI-922
(excluding Road 2 intersection)
Alley 06 NA 4-Jun-2017 5-Jun-2017 10:00 AM 6-Jun-2017 A Approved Closed

923 KHEP-CI-923 Compaction test 1st layer General fill (sta,0+100 to 0+225) Alley 08 NA 4-Jun-2017 5-Jun-2017 10:15 AM 6-Jun-2017 A Approved Closed
Second Coat, Damp Proofing Installation Inspection for RC Footing Cluster 43,
924 KHEP-CI-924
& column neck A6
4-Jun-2017 5-Jun-2017 9:00 AM 6-Jun-2017 A Approved Closed

Cast in place concrete Form work inspection for RC Column Axis


925 KHEP-CI-925
(D,E,F,G)
Cluster 01 A6 NA 4-Jun-2017 5-Jun-2017 10:00 AM 8-Jun-2017 A Approved Closed

Termite control surface preparation, installation and final inspection Cluster 24,
926 KHEP-CI-926
for PC footing BC4
4-Jun-2017 5-Jun-2017 10:30 AM 6-Jun-2017 A Approved Closed

Blinding concrete sampling, Testing & placement inspection for Cluster 24,
927 KHEP-CI-927
Footing BC4
4-Jun-2017 5-Jun-2017 11:00 AM 6-Jun-2017 A Approved Closed

Installation of reinforcing steel bar embedded item and form closure Cluster 79,
928 KHEP-CI-928
inspection for RC Column Neck BC4
4-Jun-2017 5-Jun-2017 9:30 AM 6-Jun-2017 A Approved Closed

First Coat, Damp Proofing Installation Inspection for Cmu, Mortar


929 KHEP-CI-929
and Masonry Inspection Under Exterior Reinforced G.B
Cluster 68, B2 4-Jun-2017 5-Jun-2017 9:00 AM 6-Jun-2017 E Rejected Closed

First Coat, Damp Proofing Installation Inspection for Cmu, Mortar


929.1 KHEP-CI-929-01
and Masonry Inspection Under Exterior Reinforced G.B
Cluster 68, B2 10-Jun-2017 11-Jun-2017 9:00 AM 12-Jun-2017 A Approved Closed

Termite control surface preparation, installation and final inspection Approved w/


930 KHEP-CI-930
for PC Grad beam
Cluster 14 B2 NA 5-Jun-2017 6-Jun-2017 10:30 AM 6-Jun-2017 B comments
Closed

Blinding concrete sampling, testing & placement inspection for grad


931 KHEP-CI-931
beam
Cluster 14 B2 NA 5-Jun-2017 6-Jun-2017 11:00 AM 7-Jun-2017 A Approved Closed

Cluster 78,
932 KHEP-CI-932 Cast in Place Concrete form work inspection For RC Footing
BC4
5-Jun-2017 6-Jun-2017 10:00 AM 6-Jun-2017 A Approved Closed

Installation of reinforcing steel bar embedded item and form closure Cluster 78,
933 KHEP-CI-933
inspection for RC Footing BC4
5-Jun-2017 6-Jun-2017 9:30 AM 6-Jun-2017 A Approved Closed

Cast in Place Concrete form work inspection For RC Column Axis Approved w/
934 KHEP-CI-934
(H,J2,J4,L6,N1,N4) (Ground floor)
Cluster 01 A6 NA 5-Jun-2017 6-Jun-2017 10:00 AM 6-Jun-2017 B comments
Closed

Second Coat, Damp Proofing Installation Inspection for Cmu, Mortar


935 KHEP-CI-935
and Masonry Inspection under Exterior Reinforced G.B
Cluster 68, B2 5-Jun-2017 6-Jun-2017 9:00 AM 6-Jun-2017 E Rejected Closed

Second Coat, Damp Proofing Installation Inspection for Cmu, Mortar


935.1 KHEP-CI-935-01
and Masonry Inspection under Exterior Reinforced G.B
Cluster 68, B2 12-Jun-2017 13-Jun-2017 8:00 AM 14-Jun-2017 A Approved Closed

Zone 1B Line
Compaction test of Sand Filling Above the pipe trench and laying 8 Approved w/
936 KHEP-CI-936
warning tape Swear Maine Line MH(1-L08) to
5-Jun-2017 6-Jun-2017 10:00 AM 8-Jun-2017 B comments
Closed
MH(7-L01)

Zone 1B Line
3, 4 & 5
MH(31-L03)
to MH(A1-
L03) and
Compaction test of Sand Filling Above the pipe trench and laying MH(A1-L03) Approved w/
937 KHEP-CI-937
warning tape Swear Maine Line to MH(5-L01)
5-Jun-2017 6-Jun-2017 10:00 AM 8-Jun-2017 B comments
Closed
MH(2-L04) to
MH(1-L03)
and MH(2-
L05) to
MH(1-L04)

Line 15
MH(52-L15)
to MH(54-
938 KHEP-CI-938 Inspection of Sand Filling Around pipe - Storm Maine line
L15) MH(54-
5-Jun-2017 6-Jun-2017 9:30 AM 8-Jun-2017 A Approved Closed
L15)to
MH(57-L15)
Compaction test 5th layer General fill (sta,0+100 to 0+114)
939 KHEP-CI-939
(excluding Road 2 intersection)
Alley 04 NA 5-Jun-2017 6-Jun-2017 10:00 AM 7-Jun-2017 A Approved Closed
Road 3
(sta,0+300 to
0+425)
940 KHEP-CI-940 Compaction test 1st layer General fill
(excluding
6-Jun-2017 7-Jun-2017 9:30 AM 8-Jun-2017 A Approved Closed
Road 2
intersection)

Compaction test 3rd layer General fill (sta,0+100 to 0+155)


941 KHEP-CI-941
(excluding Road 2 intersection)
Alley 06 NA 6-Jun-2017 7-Jun-2017 10:15 AM 8-Jun-2017 A Approved Closed

Zone 1B Line
34
MH(2-L34) to
MH(1-L34)
Compaction test of Sand Filling Above the pipe trench and laying
942 KHEP-CI-942
warning tape Swear Maine Line
and MH(1- 6-Jun-2017 7-Jun-2017 10:00 AM 8-Jun-2017 E Rejected Closed
L34) to
MH(A1-L34)
MH(A1-L34)
to MH(7-L02)

Line 34
MH(2-L34) to
MH(1-L34)
Compaction test of Sand Filling Above the pipe trench and laying and MH(1-
942.1 KHEP-CI-942-01
warning tape Swear Maine Line L34) to
11-Jun-2017 12-Jun-2017 9:00 AM 13-Jun-2017 A Approved Closed
MH(A1-L34)
MH(A1-L34)
to MH(7-L02)

Zone 1B Line
7
MH(19-L07)
Compaction test of Sand Filling Above the pipe trench and laying to MH(20- Approved w/
943 KHEP-CI-943
warning tape Storm Maine Line L07) and
6-Jun-2017 7-Jun-2017 10:00 AM 8-Jun-2017 B comments
Closed
MH(20-L07)
to MH(27-
L07)

Zone 1B Line
33
MH(1-L33) to
Compaction test of Sand Filling Above the pipe trench and laying
944 KHEP-CI-944
warning tape Swear Maine Line
MH(A1-L33) 6-Jun-2017 7-Jun-2017 10:00 AM 8-Jun-2017 E Rejected Closed
and MH(A1-
L33) to
MH(1-L33)

Line 33
MH(1-L33) to
Compaction test of Sand Filling Above the pipe trench and laying MH(A1-L33) Approved w/
944.1 KHEP-CI-944-01
warning tape Swear Maine Line and MH(A1-
11-Jun-2017 12-Jun-2017 9:30 AM 13-Jun-2017 B comments
Closed
L33) to
MH(1-L33)

Zone 1B Line
27
MH(108-L27)
to MH(110A-
945 KHEP-CI-945 Inspection of excavated formation for pipe trench - Storm Maine line
L27) and
6-Jun-2017 7-Jun-2017 11:00 AM 8-Jun-2017 E Rejected Closed
MH(110A-
L27) to
MH(111-L27)
Line 27
MH(108-L27)
to MH(110A-
945.1 KHEP-CI-945-01 Inspection of excavated formation for pipe trench - Storm Maine line L27) and 11-Jun-2017 12-Jun-2017 10:00 AM 13-Jun-2017 E Rejected Closed
MH(110A-
L27) to
MH(111-L27)

Zone 1B Line
27
MH(108-L27)
to MH(110A-
945.2 KHEP-CI-945-02 Inspection of excavated formation for pipe trench - Storm Maine line
L27) and
14-Jun-2017 15-Jun-2017 9:00 AM 17-Jun-2017 A Approved Closed
MH(110A-
L27) to
MH(111-L27)

Zone 1B Line
27
MH(111-L27)
to MH(111a-
946 KHEP-CI-946 Inspection of excavated formation for pipe trench - Storm Maine line
L27) and
6-Jun-2017 7-Jun-2017 11:00 AM 8-Jun-2017 E Rejected Closed
MH(111a-
L27) to
MH(114-L27)

Line 27
MH(111-L27)
to MH(111a-
Compaction test of Excavated Formation for Pipe Trench Storm Main
946.1 KHEP-CI-946-01
Line
L27) and 11-Jun-2017 12-Jun-2017 10:30 AM 13-Jun-2017 E Rejected Closed
MH(111a-
L27) to
MH(114-L27)

Zone 1B Line
27
MH(111-L27)
to MH(111a-
946.2 KHEP-CI-946-02 Inspection of excavated formation for pipe trench - Storm Maine line
L27) and
14-Jun-2017 15-Jun-2017 9:30 AM 17-Jun-2017 A Approved Closed
MH(111a-
L27) to
MH(114-L27)

Cast in Place Concrete form work inspection For RC Column Axis


947 KHEP-CI-947
(A,B,C) (Ground floor)
Cluster 01 A6 NA 6-Jun-2017 7-Jun-2017 10:00 AM 8-Jun-2017 A Approved Closed

First Coat, Damp Proofing Installation Inspection for Cmu, Mortar


948 KHEP-CI-948
and Masonry Inspection Under Exterior Reinforced G.B
Cluster 11 B2 NA 6-Jun-2017 7-Jun-2017 9:00 AM 8-Jun-2017 A Approved Closed

First Coat, Damp Proofing Installation Inspection for RC Footing &


949 KHEP-CI-949
column neck Grid Line (A & B)
Cluster 4, A6 6-Jun-2017 7-Jun-2017 9:00 AM 8-Jun-2017 A Approved Closed

Second Coat, Damp Proofing Installation Inspection for Cmu, Mortar


950 KHEP-CI-950
and Masonry Inspection under Exterior Reinforced G.B
Cluster 11 B2 NA 7-Jun-2017 8-Jun-2017 9:00 AM 8-Jun-2017 A Approved Closed

Compaction test 2nd layer General fill (sta,0+100 to 0+225)


951 KHEP-CI-951
(excluding Road 2 intersection)
Alley 08 NA 7-Jun-2017 8-Jun-2017 11:00 AM 8-Jun-2017 A Approved Closed

Line 7
MH(29-L07)
to MH(29a-
952 KHEP-CI-952 Inspection of Sand Filling Around Storm Maine line (800m) L07) and 7-Jun-2017 8-Jun-2017 11:00 AM 10-Jun-2017 A Approved Closed
MH(29a-L07)
to MH(30-
L04)
Second Coat, Damp Proofing Installation Inspection for RC Footing
953 KHEP-CI-953
& column neck Grid Line (A & B)
Cluster 4, A6 10-Jun-2017 11-Jun-2017 9:00 AM 12-Jun-2017 A Approved Closed

First Coat, Damp Proofing Installation Inspection for RC Footing &


954 KHEP-CI-954
column neck
Cluster 71, B2 10-Jun-2017 11-Jun-2017 9:30 AM 12-Jun-2017 A Approved Closed

Cluster 78,
955 KHEP-CI-955 Concrete sampling, testing and placement inspection for RC Footing
BC4
10-Jun-2017 11-Jun-2017 8:00 AM 12-Jun-2017 A Approved Closed

Damp Proofing surface Preparation for RC Foundation & Column Cluster 6,


956 KHEP-CI-956
Neck BC4
10-Jun-2017 11-Jun-2017 10:00 AM 12-Jun-2017 A Approved Closed

Line 1
MH(21-L01)
to MH(20-
957 KHEP-CI-957 Excavated Formation of Pipe - Trench Swear Main Line L01) and 10-Jun-2017 11-Jun-2017 9:30 AM 12-Jun-2017 A Approved Closed
MH(20-L01)
to MH(19-
L01)
Line 1
MH(17-L01)
to MH(16-
Approved w/
958 KHEP-CI-958 Excavated Formation of Pipe - Trench Swear Main Line L01) and 10-Jun-2017 11-Jun-2017 9:30 AM 12-Jun-2017 B comments
Closed
MH(16-L01)
to MH(15-
L01)
Line 1
MH(19-L01)
to MH(18-
959 KHEP-CI-959 Excavated Formation of Pipe - Trench Swear Main Line L01) and 10-Jun-2017 11-Jun-2017 9:30 AM 12-Jun-2017 E Rejected Closed
MH(18-L01)
to MH(17-
L01)
Line 1
MH(17-L01)
to MH(16-
959.1 KHEP-CI-959-01 Inspection of Excavated Formation of Pipe - Trench Swear Main Line L01) and 17-Jun-2017 18-Jun-2017 10:30 AM 19-Jun-2017 A Approved Closed
MH(16-L01)
to MH(15-
L01)
Line 15
MH(52-L15)
to MH(54-
Compaction test of Sand Filling Above the pipe trench and laying
960 KHEP-CI-960
warning tape Storm Maine Line
L15) and 10-Jun-2017 11-Jun-2017 9:30 AM 12-Jun-2017 A Approved Closed
MH(54-L15)
to MH(57-
L15)
Line 15
MH(46-L15)
961 KHEP-CI-961 Inspection of Sand Filling Around Storm Maine line
to MH(47-
10-Jun-2017 11-Jun-2017 9:30 AM 12-Jun-2017 A Approved Closed
L15)
Damp Proofing surface Preparation for RC Foundation & Column Cluster 16
962 KHEP-CI-962
Neck BC4
NA 10-Jun-2017 11-Jun-2017 10:00 AM 12-Jun-2017 A Approved Closed

Second Coat, Damp Proofing Installation Inspection for RC Footing


963 KHEP-CI-963
& column neck
Cluster 71, B2 10-Jun-2017 11-Jun-2017 9:30 AM 12-Jun-2017 A Approved Closed

Concrete sampling, testing and placement inspection for RC Column


964 KHEP-CI-964
(Ground Floor) Axis (A:N)
Cluster 01 A6 NA 10-Jun-2017 11-Jun-2017 9:00 AM 12-Jun-2017 A Approved Closed

Line 7
MH(29-L07)
to MH(29a-
Compaction test of Sand Filling Above the pipe trench and laying Approved w/
965 KHEP-CI-965
warning tape Storm Maine Line
L07) and 11-Jun-2017 12-Jun-2017 8:30 AM 14-Jun-2017 B comments
Closed
MH(29a-L07)
to MH(30-
L04)
MH(47-L15)
Compaction test of Sand Filling Above the pipe trench and laying
966 KHEP-CI-966
warning tape Storm Maine Line
to MH(46- 11-Jun-2017 12-Jun-2017 9:00 AM 13-Jun-2017 A Approved Closed
L15)
Compaction test 6th layer Back filling General fill (sta,0+100 to Approved w/
967 KHEP-CI-967
0+114)
Alley 04 NA 11-Jun-2017 12-Jun-2017 9:30 AM 13-Jun-2017 B comments
Closed

Compaction test 4th layer Back filling General fill (sta,0+100 to


968 KHEP-CI-968
0+155)
Alley 06 NA 11-Jun-2017 12-Jun-2017 10:00 AM 12-Jun-2017 A Approved Closed
Compaction test 3rd layer Back filling General fill (sta,0+175 to Approved w/
969 KHEP-CI-969
0+225)
Alley 08 NA 11-Jun-2017 12-Jun-2017 10:20 AM 12-Jun-2017 B comments
Closed

Line 8 MH(4-
L08) to
MH(3-L08)
and MH(3-
L08) to
MH(2-L08)
MH(2-L08) to
MH(1-L08) Approved w/
970 KHEP-CI-970 Back filling General Fill 1st Layer for the trench of main Sewer Line
and MH(1-
11-Jun-2017 12-Jun-2017 9:00 AM 14-Jun-2017 B comments
Closed
L08) to
MH(7-L01)
MH(1-L07) to
MH(3-L08)
and MH(1-
L06) to
MH(2-L08)

Line 8
MH(29-L07)
to MH(29a-
Sand fill around the Pipe up to the top of 800mm Dia, Storm Main
971 KHEP-CI-971
Line
L07) and 11-Jun-2017 12-Jun-2017 9:30 AM 13-Jun-2017 A Approved Closed
MH(29a-L07)
to MH(30-
L04)
Termite control surface preparation, installation and final inspection
972 KHEP-CI-972
for PC Grad beam
Cluster 10 B2 NA 11-Jun-2017 12-Jun-2017 10:30 AM 14-Jun-2017 E Rejected Closed

Termite control surface preparation, installation and final inspection


972.1 KHEP-CI-972-01
for PC Grad beam
Cluster 10 B2 NA 15-Jun-2017 17-Jun-2017 10:30 AM 18-Jun-2017 A Approved Closed

Blinding concrete sampling, testing & placement inspection for grad


973 KHEP-CI-973
beam
Cluster 10 B2 NA 11-Jun-2017 12-Jun-2017 11:00 AM 14-Jun-2017 E Rejected Closed

Blinding concrete sampling, testing & placement inspection for grad


973.1 KHEP-CI-973-01
beam
Cluster 10 B2 NA 15-Jun-2017 17-Jun-2017 11:00 AM 18-Jun-2017 A Approved Closed

40cm, CMU, Mortar and Masonry Inspection Under Exterior Cluster 66,
974 KHEP-CI-974
Reinforced G.B A6
11-Jun-2017 12-Jun-2017 10:00 AM 12-Jun-2017 A Approved Closed

Cast in Place Concrete form work inspection For RC Column Ground


975 KHEP-CI-975
floor Axis (A : F)
Cluster 02 A6 NA 11-Jun-2017 12-Jun-2017 10:00 AM 12-Jun-2017 A Approved Closed

Road 3
976 KHEP-CI-976 Compaction test 2nd layer General fill (sta,0+300 to 12-Jun-2017 13-Jun-2017 8:30 AM 14-Jun-2017 A Approved Closed
0+425)

Line 31
MH(3-L31) to
MH(2-L31)
and MH(2-
L31) to
MH(1-L31)
977 KHEP-CI-977 Sand fill around the Pipe of Sewer line MH(1-L31) to 12-Jun-2017 13-Jun-2017 9:00 AM 14-Jun-2017 A Approved Closed
MH(1A-L31)
and MH(1A-
L31) to
MH(9-L02)
MH(1-L32) to
MH(1-L31)

Line 1
MH(21-L01)
978 KHEP-CI-978 Sand Bedding of sewer line under the Pipe
to MH(17-
12-Jun-2017 13-Jun-2017 9:30 AM 14-Jun-2017 A Approved Closed
L01)
Line 3 MH(3-
L03) to
MH(2-L03)
and MH(2-
L03) to
979 KHEP-CI-979 Back filling General Fill 1st Layer general fill MH(1-L03) 12-Jun-2017 13-Jun-2017 10:00 AM 15-Jun-2017 E Rejected Closed
MH(1-L03) to
MH(1A-L03)
and MH(1A-
L03) to
MH(5-L03)

Zone 1B, Line


3 MH(3-L03)
to MH(2-L03)
and MH(2-
L03) to
979.1 KHEP-CI-979-01 Back filling General Fill 1st Layer for pipe trench - Sewer Maine line MH(1-L03) 18-Jun-2017 19-Jun-2017 10:00 AM 21-Jun-2017 A Approved Closed
MH(1-L03) to
MH(1A-L03)
and MH(1A-
L03) to
MH(5-L03)

Line 4/5
MH(2-L04) to
MH(1-L04)
and MH(1-
L04) to
980 KHEP-CI-980 Back filling General Fill 1st Layer general fill MH(1-L03) 12-Jun-2017 13-Jun-2017 10:30 AM 14-Jun-2017 A Approved Closed
MH(2-L05) to
MH(1-L05)
and MH(1-
L05) to
MH(1-L04)

Termite control surface preparation, installation and final inspection


981 KHEP-CI-981
for PC Grad beam
Cluster 5, B2 12-Jun-2017 13-Jun-2017 10:30 AM 14-Jun-2017 E Rejected Closed

Termite control surface preparation, installation and final inspection


981.1 KHEP-CI-981-01 for PC Grad beam Cluster 5, B2 NA Division 03 2-Jul-2017 3-Jul-2017 10:30 AM 4-Jul-2017 A Approved Closed
Cluster 5, B2
Blinding concrete sampling, testing & placement inspection for grad
982 KHEP-CI-982
beam
Cluster 5, B2 12-Jun-2017 13-Jun-2017 11:00 AM 14-Jun-2017 E Rejected Closed

Blinding concrete sampling, testing & placement inspection for grad


982.1 KHEP-CI-982-01 beam Cluster Cluster 5, B2 NA Division 03 2-Jul-2017 3-Jul-2017 3:00 PM 6-Jul-2017 A Approved Closed
5, B2

First Coat, Damp Proofing Installation Inspection for Cmu, Mortar Cluster 81,
983 KHEP-CI-983
and Masonry Inspection Under Exterior Reinforced G.B A6
12-Jun-2017 13-Jun-2017 9:00 AM 14-Jun-2017 A Approved Closed

First Coat, Damp Proofing Installation Inspection for RC Footing & Cluster 6,
984 KHEP-CI-984
column neck BC4
12-Jun-2017 13-Jun-2017 9:00 AM 14-Jun-2017 A Approved Closed

Compaction test 6th layer back filling General fill (sta,0+100 to


985 KHEP-CI-985
0+114)
Alley 04 NA 13-Jun-2017 14-Jun-2017 8:30 AM 17-Jun-2017 A Approved Closed

Compaction test 5th layer back filling General fill (sta,0+100 to Approved w/
986 KHEP-CI-986
0+155)
Alley 06 NA 13-Jun-2017 14-Jun-2017 9:00 AM 15-Jun-2017 B comments
Closed

Line 15
MH(51-L15)
to MH(54-
Approved w/
987 KHEP-CI-987 Compaction test 1st layer General fill of Storm Trench L15) and 13-Jun-2017 14-Jun-2017 9:30 AM 15-Jun-2017 B comments
Closed
MH(54-L15)
to MH(52-
L15)
Cast in Place Concrete form work inspection For RC Column Ground Approved w/
988 KHEP-CI-988
floor Axis (G : K)
Cluster 02 A6 NA 13-Jun-2017 14-Jun-2017 10:00 AM 17-Jun-2017 B comments
Closed
Second Coat, Damp Proofing Installation Inspection for Cmu, Mortar Cluster 81,
989 KHEP-CI-989
and Masonry Inspection Under Exterior Reinforced G.B A6
13-Jun-2017 14-Jun-2017 9:00 AM 14-Jun-2017 A Approved Closed

Second Coat, Damp Proofing Installation Inspection for RC Footing Cluster 6,


990 KHEP-CI-990
& Column Neck BC4
13-Jun-2017 14-Jun-2017 9:30 AM 14-Jun-2017 A Approved Closed

Line 8 MH(3-
L08) to
MH(2-L08)
991 KHEP-CI-991 Inspection of excavated formation for pipe trench - Sewer Maine line
and MH(2-
13-Jun-2017 14-Jun-2017 10:00 AM 15-Jun-2017 E Rejected Closed
L08) to
MH(1-L08)

Zone 1B Line
9 MH(3-L09)
to MH(2-L09)
991.1 KHEP-CI-991-01 Inspection of excavated formation for pipe trench - Sewer Maine line
and MH(2-
17-Jun-2017 18-Jun-2017 10:30 AM 19-Jun-2017 A Approved Closed
L09) to
MH(1-L09)

Installation of reinforcing steel bar embedded item and form closure


992 KHEP-CI-992
inspection for RC Grad Beam
Cluster 15 B2 NA 13-Jun-2017 14-Jun-2017 10:00 AM 17-Jun-2017 A Approved Closed

Zone 1B,
993 KHEP-CI-993 Compaction test 1st and final layer Selected fill Cluster 23 14-Jun-2017 15-Jun-2017 9:00 AM 17-Jun-2017 A Approved Closed
BC4

Line 27
MH(114-L27)
to MH(111a-
994 KHEP-CI-994 Sand Bedding of storm line under the Pipe L27) and 14-Jun-2017 15-Jun-2017 10:00 AM 17-Jun-2017 A Approved Closed
MH(111a-
L27) to
MH(111-L27)

995 KHEP-CI-995 Back filling General Fill 4th Layer (sta,0+200 to 0+225) Alley 08 NA 14-Jun-2017 15-Jun-2017 10:30 AM 17-Jun-2017 E Rejected Closed
Zone 2B,
Alley 8
995.1 KHEP-CI-995-01 Compaction test 4th layer General fill
(sta,0+200 to
18-Jun-2017 19-Jun-2017 10:45 AM 21-Jun-2017 A Approved Closed
0+225)
Line 7
MH(19-L07)
to MH(20-
996 KHEP-CI-996 Back filling General Fill Storm 1st Layer (Final up to existing level) L07) and 14-Jun-2017 15-Jun-2017 10:30 AM 17-Jun-2017 E Rejected Closed
MH(20-L07)
to MH(27-
L07)

Zone 1B, Line


7 MH(19-L07)
to MH(20-
Back filling General Fill Storm 1st Layer for pipe trench - Storm Maine
996.1 KHEP-CI-996-01
line
L07) and 18-Jun-2017 19-Jun-2017 10:00 AM 19-Jun-2017 A Approved Closed
MH(20-L07)
to MH(27-
L07)

Line 15
MH(46-L15)
997 KHEP-CI-997 Back filling General Fill Storm 1st Layer (Final up to existing level)
to MH(47-
14-Jun-2017 15-Jun-2017 10:30 AM 17-Jun-2017 A Approved Closed
L15)
998 KHEP-CI-998 Compaction test and Formation level Zone 2B 14-Jun-2017 15-Jun-2017 10:30 AM 17-Jun-2017 A Approved Closed

Zone 1B, Line


2 MH(18-L02)
to MH(17-
999 KHEP-CI-999 Inspection of excavated formation for pipe trench Sewer main line L02) and 15-Jun-2017 16-Jun-2017 11:00 AM 18-Jun-2017 E Rejected Closed
MH(17-L02)
to MH(16-
L02)
Zone 1B, Line
2 MH(18-L02)
to MH(17-
Approved w/
999.1 KHEP-CI-999-01 Inspection of excavated formation for pipe trench Sewer main line L02) and 19-Jun-2017 19-Jun-2017 10:00 AM 21-Jun-2017 B comments
Closed
MH(17-L02)
to MH(16-
L02)

Termite control surface preparation, installation and final inspection


1000 KHEP-CI-1000
for PC Grad beam
Cluster 11 B2 NA 15-Jun-2017 16-Jun-2017 10:30 AM 19-Jun-2017 A Approved Closed

Blinding concrete sampling, testing & placement inspection for grad Approved w/
1001 KHEP-CI-1001
beam
Cluster 11 B2 NA 15-Jun-2017 16-Jun-2017 11:00 AM 19-Jun-2017 B comments
Closed

Zone 2B,
Road 3,
(sta,3+375 to
1002 KHEP-CI-1002 Compaction test 3rd layer general fill 0+425) 17-Jun-2017 18-Jun-2017 10:45 AM 19-Jun-2017 A Approved Closed
(excluding
road 2
intersection)

Zone 1 B,
Line 1,
1003 KHEP-CI-1003 Inspection of excavated formation for pipe trench Sewer main line MH(15-L01) 17-Jun-2017 18-Jun-2017 10:30 AM 19-Jun-2017 E Rejected Closed
to MH(14-
L01)
Inspection of excavated and Compaction formation for pipe trench
Approved w/
1003.1 KHEP-CI-1003-01 Sewer main line Zone 1B, Line 1 Zone 1B Division 31 20-Sep-2017 21-Sep-2017 11:00 AM 24-Sep-2017 B comments
Closed
Line 1, MH(15-L01) to MH(14-L01)
Installation of reinforcing steel bar embedded item and form closure
1004 KHEP-CI-1004
inspection for RC Grad Beam
Cluster 13 B2 NA 17-Jun-2017 18-Jun-2017 10:00 AM 19-Jun-2017 A Approved Closed

Damp Proofing surface Preparation for RC Foundation & Column


1005 KHEP-CI-1005
Neck
Cluster 58, B2 17-Jun-2017 18-Jun-2017 8:30 AM 19-Jun-2017 E Rejected Closed

Damp Proofing surface Preparation for RC Foundation & Column Approved w/


1005.1 KHEP-CI-1005-01
Neck
Cluster 58, B2 29-Jun-2017 1-Jul-2017 8:30 AM 2-Jul-2017 B comments
Closed

Damp Proofing surface Preparation for RC Foundation & Column


1006 KHEP-CI-1006
Neck
Cluster 54, B2 17-Jun-2017 18-Jun-2017 9:30 AM 19-Jun-2017 E Rejected Closed

Damp Proofing surface Preparation for RC Foundation & Column Approved w/


1006.1 KHEP-CI-1006-01
Neck
Cluster 54, B2 29-Jun-2017 1-Jul-2017 8:30 AM 2-Jul-2017 B comments
Closed

Zone 2B, Line


9 & 10 MH(1-
L09) to
MH(1a-L09)
and MH(1a-
L09) to
1007 KHEP-CI-1007 Inspection of excavated formation for pipe trench Sewer main line
MH(9-L01)
17-Jun-2017 18-Jun-2017 10:30 AM 19-Jun-2017 A Approved Closed
MH(1-L10) to
MH(1a-L10)
and MH(1a-
L10) to
MH(1-L09)

Cast in Place Concrete form work inspection For RC Column Ground Approved w/
1008 KHEP-CI-1008
floor Axis (G3, J1,J3,K6,K5,K4,L6,L4,L3,L2,M6,M5)
Cluster 02 A6 NA 17-Jun-2017 18-Jun-2017 10:00 AM 19-Jun-2017 B comments
Closed

Cast in Place Concrete form work inspection For RC Column Ground


1009 KHEP-CI-1009
floor Axis (A4,B2,B3,C5,D2,D3,F2,F3,H2,H3,K1,K2,K3,L5)
Cluster 02 A6 NA 18-Jun-2017 19-Jun-2017 10:00 AM 21-Jun-2017 A Approved Closed

Compaction test and Formation Existing Level (sta,0+200 to 0+225)


1010 KHEP-CI-1010
(Excluding Road 1intersection)
Alley 08 NA 18-Jun-2017 19-Jun-2017 11:00 AM 21-Jun-2017 E Rejected Closed

Compaction test and Formation Existing Level (sta,0+000 to 0+098)


1010.1 KHEP-CI-1010-01
(Excluding Road 1intersection)
Alley 03 NA 21-Jun-2017 22-Jun-2017 11:00 AM 22-Jun-2017 A Approved Closed

Compaction test and Formation Existing Level (sta,0+000 to 0+102)


1011 KHEP-CI-1011
(Excluding Road 3intersection)
Alley 12 18-Jun-2017 19-Jun-2017 11:00 AM 21-Jun-2017 E Rejected Closed

Compaction test and Formation Existing Level (sta,0+000 to 0+102)


1011.1 KHEP-CI-1011-01
(Excluding Road 3intersection)
Alley 12 21-Jun-2017 22-Jun-2017 11:00 AM 22-Jun-2017 A Approved Closed

Compaction test and Formation Existing Level (sta,0+000 to 0+100) Approved w/


1012 KHEP-CI-1012
(Excluding Road 3intersection)
Alley 13 18-Jun-2017 19-Jun-2017 11:00 AM 21-Jun-2017 B comments
Closed
Line 7,
MH(28-L07) Approved w/
1013 KHEP-CI-1013 Inspection of Sand Filling Around Pipe - Storm Maine line
to MH(29-
18-Jun-2017 19-Jun-2017 9:30 AM 21-Jun-2017 B comments
Closed
L07)
Zone 4B, Line
2, MH(21-
L02) to
MH(20-L02)
and MH(20-
1014 KHEP-CI-1014 Inspection of excavated formation for pipe trench Sewer main line
L02) to
18-Jun-2017 19-Jun-2017 10:30 AM 19-Jun-2017 E Rejected Closed
MH(19-L02)
MH(19-L02)
to MH(18-
L02)

Zone 4B, Line


2, MH(21-
L02) to
MH(20-L02)
and MH(20- Approved w/
1014.1 KHEP-CI-1014-01 Inspection of excavated formation for pipe trench Sewer main line
L02) to
21-Jun-2017 22-Jun-2017 10:00 AM 22-Jun-2017 B comments
Closed
MH(19-L02)
MH(19-L02)
to MH(18-
L02)

Zone 4B, Line


2, MH(22-
L02) to
MH(21-L02)
and MH(16- Approved w/
1015 KHEP-CI-1015 Inspection of excavated formation for pipe trench Sewer main line
L02) to
19-Jun-2017 20-Jun-2017 10:30 AM 21-Jun-2017 B comments
Closed
MH(15-L02)
MH(15-L02)
to MH(14-
L02)

Zone 2B,
Alley 6
(sta,0+100 to
Approved w/
1016 KHEP-CI-1016 Compaction test 7th layer general fill 0+155) 19-Jun-2017 20-Jun-2017 10:45 AM 21-Jun-2017 B comments
Closed
(Excluding
Road 2
intersection)

Approved w/
1017 KHEP-CI-1017 Cast in place concrete Form work inspection for RC Grad Beam Cluster 15 B2 NA 19-Jun-2017 20-Jun-2017 10:00 AM 22-Jun-2017 B comments
Closed

Zone 2B,
Approved w/
1018 KHEP-CI-1018 Compaction test and Formation Existing Level Landscape 19-Jun-2017 20-Jun-2017 10:30 AM 21-Jun-2017 B comments
Closed
Area (Area 2)

Zone 1B, Line


31 & 32,
MH(3-L31) to
MH(2-L31)
and MH(2-
L31) to
Compaction test of Sand Filling Above the pipe trench and laying MH(1-L31) Approved w/
1019 KHEP-CI-1019
warning tape Sewer Maine Line MH(1-L31) to
19-Jun-2017 20-Jun-2017 10:15 AM 21-Jun-2017 B comments
Closed
MH(1a-L31)
and MH(1a-
L31) to
MH(9-L02)
MH(1-L32) to
MH(1-L31)
Zone 1B,
Line1,
MH(17-L01)
Compaction test of Sand Bedding Under Pipe Trench - Sewer Maine to MH(16- Approved w/
1020 KHEP-CI-1020
Line L01) and
19-Jun-2017 20-Jun-2017 10:15 AM 22-Jun-2017 B comments
Closed
MH(16-L01)
to MH(15-
L01)
Zone 2B,
1021 KHEP-CI-1021 Inspection of excavated formation Level bottom of Foundation Cluster 15, 19-Jun-2017 20-Jun-2017 10:30 AM 21-Jun-2017 E Rejected Closed
BC4
Zone 2B,
1021.1 KHEP-CI-1021-01 Compaction test excavated formation Level bottom of Foundation Cluster 28, 21-Jun-2017 22-Jun-2017 10:30 AM 22-Jun-2017 A Approved Closed
BC4
Zone 2B,
1022 KHEP-CI-1022 Compaction test excavated formation Level bottom of Foundation Cluster 29, 19-Jun-2017 20-Jun-2017 10:30 AM 21-Jun-2017 E Rejected Closed
BC4
Zone 2B,
1022.1 KHEP-CI-1022-01 Compaction test excavated formation Level bottom of Foundation Cluster 29, 21-Jun-2017 22-Jun-2017 10:30 AM 22-Jun-2017 A Approved Closed
BC4

Zone 1B, Line


34 & 33,
MH(2-L34) to
MH(1-L34)
and MH(1-
L34) to
MH(1a-L34)
Back filling General Fill Storm 1st Layer for pipe trench - Sewer Maine Approved w/
1023 KHEP-CI-1023
line
MH(1a-L07) 20-Jun-2017 21-Jun-2017 9:00 AM 22-Jun-2017 B comments
Closed
to MH(7-L02)
and MH(1-
L33) to
MH(1a-L33)
and MH(1a-
L33) to
MH(1-L34)

Installation of reinforcing steel bar embedded item and form closure


1024 KHEP-CI-1024
inspection for RC Grad Beam
Cluster 12 B2 NA 20-Jun-2017 21-Jun-2017 10:00 AM 22-Jun-2017 A Approved Closed

Installation of reinforcing steel bar embedded item and form closure


1025 KHEP-CI-1025
inspection for RC Grad Beam
Cluster 14 B2 NA 20-Jun-2017 21-Jun-2017 10:30 AM 22-Jun-2017 A Approved Closed

Installation of reinforcing steel bar embedded item and form closure Cluster 69,
1026 KHEP-CI-1026
inspection for RC Roof Slab B2 Mockup
20-Jun-2017 21-Jun-2017 9:30 AM 22-Jun-2017 A Approved Closed

Cast in Place Concrete form work inspection For RC Column Ground


1027 KHEP-CI-1027
floor Axis (E4,G2,M2,M3,M4,N2,N3)
Cluster 02 A6 NA 20-Jun-2017 21-Jun-2017 10:00 AM 22-Jun-2017 A Approved Closed

First Coat, Damp Proofing Installation Inspection for RC Footing & Cluster 16,
1028 KHEP-CI-1028
column neck BC4
NA 20-Jun-2017 21-Jun-2017 9:00 AM 22-Jun-2017 A Approved Closed

Zone 1B,
Line7,
Compaction test of Sand Filling Above the pipe trench and laying Approved w/
1029 KHEP-CI-1029
warning tape Storm Maine Line
MH(28-L07) 20-Jun-2017 21-Jun-2017 10:15 AM 22-Jun-2017 B comments
Closed
to MH(29-
L07)

Zone 2B, Line


7 & 8,
MH(28-L07)
to MH(27-
L07) and
MH(27-L07)
Approved w/
1030 KHEP-CI-1030 Inspection of excavated formation for pipe trench Storm maine line to MH(26a- 20-Jun-2017 21-Jun-2017 10:00 AM 22-Jun-2017 B comments
Closed
L08) MH(26a-
L08) to
MH(26-L08)
and MH(26-
L08) to
MH(21-L08)
Zone 2B,
1031 KHEP-CI-1031 Compaction test 1st layer general fill Landscape 20-Jun-2017 21-Jun-2017 10:30 AM 22-Jun-2017 A Approved Closed
Area (Area 1)

Zone 1B, Line


34 & 33,
MH(2-L34) to
MH(1-L34)
and MH(1-
L34) to
MH(1a-L34)
Back filling General Fill Storm 2nd Layer for pipe trench - Sewer Approved w/
1032 KHEP-CI-1032
Maine line
MH(1a-L34) 21-Jun-2017 22-Jun-2017 9:00 AM 22-Jun-2017 B comments
Closed
to MH(7-L02)
and MH(1-
L33) to
MH(1a-L33)
and MH(1a-
L33) to
MH(1-L34)

Zone 2B,
Road 3
(sta,0+375 to
1033 KHEP-CI-1033 Compaction test 4th layer general fill 0+425) 21-Jun-2017 22-Jun-2017 10:45 AM 22-Jun-2017 A Approved Closed
(Excluding
Road 2
intersection)

Zone 1B, Line


9 & 10,
MH(3-L09) to
MH(2-L09)
and MH(2-
L09) to
MH(1-L09)
MH(1-L09) to
Compaction test of Sand Bedding Under Pipe Trench - Sewer Maine MH(1a-L09)
1034 KHEP-CI-1034
Line and MH(1a-
21-Jun-2017 22-Jun-2017 10:15 AM 22-Jun-2017 E Rejected Closed
L09) to
MH(9-L01)
and MH(1-
L10) to
MH(1a-L10)
and MH(1a-
L10) to
MH(1-L09)

Zone 2B, Line


9 & 10,
MH(3-L09) to
MH(2-L09)
and MH(2-
L09) to
MH(1-L09)
MH(1-L09) to
Compaction test of Sand Bedding Under Pipe Trench - Sewer Maine MH(1a-L09)
1034.1 KHEP-CI-1034-01
Line and MH(1a-
28-Jun-2017 29-Jun-2017 10:15 AM 29-Jun-2017 A Approved Closed
L09) to
MH(9-L01)
and MH(1-
L10) to
MH(1a-L10)
and MH(1a-
L10) to
MH(1-L09)
Zone 4B,
Line27,
MH(111-L27)
Compaction test of Sand Bedding Under Pipe Trench - Storm Maine to MH(110a- Approved w/
1035 KHEP-CI-1035
Line L27) and
21-Jun-2017 22-Jun-2017 10:15 AM 22-Jun-2017 B comments
Closed
MH(110a-
L27) to
MH(108-L27)

Cast in Place Concrete form work inspection For RC Column Ground


1036 KHEP-CI-1036
floor Axis (N1,N3,N4,M1)
Cluster 02 A6 NA 21-Jun-2017 22-Jun-2017 10:00 AM 22-Jun-2017 A Approved Closed

Damp Proofing surface Preparation for RC Foundation & Column


1037 KHEP-CI-1037
Neck
Cluster 75, B2 21-Jun-2017 22-Jun-2017 10:30 AM 22-Jun-2017 A Approved Closed

First Coat, Damp Proofing Installation Inspection for Cmu, Mortar Cluster 66,
1038 KHEP-CI-1038
and Masonry Inspection Under Exterior Reinforced G.B A6
21-Jun-2017 22-Jun-2017 9:30 AM 22-Jun-2017 A Approved Closed

Zone 1B, Line


34 & 33,
MH(2-L34) to
MH(1-L34)
and MH(1-
L34) to
MH(1a-L34)
Approved w/
1039 KHEP-CI-1039 Back filling General Fill 3rd Layer for pipe trench - Sewer Maine line MH(1a-L34) 28-Jun-2017 29-Jun-2017 3:00 PM 1-Jul-2017 B comments
Closed
to MH(7-L02)
and MH(1-
L33) to
MH(1a-L33)
and MH(1a-
L33) to
MH(1-L34)

Zone 1B, Line


31 & 32,
MH(3-L31) to
MH(2-L31)
and MH(2-
L31) to
MH(1-L31)
and MH(1- Approved w/
1040 KHEP-CI-1040 Back filling General Fill 1st Layer for pipe trench - Sewer Maine line
L31) to
28-Jun-2017 29-Jun-2017 3:00 PM 1-Jul-2017 B comments
Closed
MH(1a-L31)
and MH(1a-
L31) to
MH(9-L02)
and MH(1-
L32) to
MH(1-L31)

Approved w/
1041 KHEP-CI-1041 Cast in Place Concrete form work inspection For RC Roof Slab Cluster 69, B2 28-Jun-2017 29-Jun-2017 9:00 AM 29-Jun-2017 B comments
Closed

Second Coat, Damp Proofing Installation Inspection for RC Footing Cluster 16 Approved w/
1042 KHEP-CI-1042
& Column Neck BC4
NA 28-Jun-2017 29-Jun-2017 10:00 AM 29-Jun-2017 B comments
Closed

Second Coat, Damp Proofing Installation Inspection for Cmu, Mortar Cluster 66,
1043 KHEP-CI-1043
and Masonry Inspection Under Exterior Reinforced G.B A6
28-Jun-2017 29-Jun-2017 10:30 AM 29-Jun-2017 A Approved Closed

Termite control surface preparation, installation and final inspection Cluster 23, Approved w/
1044 KHEP-CI-1044
for PC footing BC4
28-Jun-2017 29-Jun-2017 11:00 AM 1-Jul-2017 B comments
Closed

Blinding concrete sampling, Testing & placement inspection for Cluster 23,
1045 KHEP-CI-1045
Footing BC4
28-Jun-2017 29-Jun-2017 1:30 PM 1-Jul-2017 A Approved Closed

40cm, CMU, Mortar and Masonry Inspection Under Exterior


1046 KHEP-CI-1046
Reinforced G.B
Cluster 3, A6 28-Jun-2017 29-Jun-2017 2:00 PM 1-Jul-2017 A Approved Closed

1047 KHEP-CI-1047 Concrete sampling, testing & placement inspection for RC grad beam Cluster 15 B2 NA 28-Jun-2017 29-Jun-2017 8:30 AM 29-Jun-2017 A Approved Closed
Zone 2B, Line
7 & 8,
MH(28-L07)
to MH(27-
L07) and
MH(27-L07)
Compaction test of Sand Bedding Under Pipe Trench - Storm Maine Approved w/
1048 KHEP-CI-1048
Line
to MH(26a- 28-Jun-2017 29-Jun-2017 10:00 AM 1-Jul-2017 B comments
Closed
L08) MH(26a-
L08) to
MH(26-L08)
and MH(26-
L08) to
MH(21-L08)

Zone 4B, Line


2, MH(22-
L02) to
MH(21-L02)
and MH(21-
L02) to
Compaction test of Sand Bedding Under Pipe Trench - Sewer Maine Approved w/
1049 KHEP-CI-1049
Line
MH(20-L02) 28-Jun-2017 29-Jun-2017 11:00 AM 1-Jul-2017 B comments
Closed
and MH(20-
L02) to
MH(19-L02)
and MH(19-
L02) to
MH(18-L02)

Zone 3B, Line


2, MH(18-
L02) to
MH(17-L02)
and MH(17-
L02) to
Compaction test of Sand Bedding Under Pipe Trench - Sewer Maine Approved w/
1050 KHEP-CI-1050
Line
MH(16-L02) 28-Jun-2017 29-Jun-2017 2:00 PM 1-Jul-2017 B comments
Closed
and MH(16-
L02) to
MH(15-L02)
and MH(15-
L02) to
MH(14-L02)

Cast in Place Concrete form work inspection For RC Column (ground


1051 KHEP-CI-1051
floor)
Cluster 02 A6 NA 28-Jun-2017 29-Jun-2017 10:00 AM 29-Jun-2017 A Approved Closed

1052 KHEP-CI-1052 Damp Proofing surface Preparation for RC grad beam Cluster 69, B2 28-Jun-2017 29-Jun-2017 10:30 AM 29-Jun-2017 A Approved Closed

Approved w/
1053 KHEP-CI-1053 First Coat, Damp Proofing Installation Inspection for RC Grad beam Cluster 69, B2 29-Jun-2017 1-Jul-2017 10:00 AM 2-Jul-2017 B comments
Closed

Approved w/
1054 KHEP-CI-1054 Cast in place concrete Form work inspection for RC Grad Beam Cluster 13 B2 NA 29-Jun-2017 1-Jul-2017 10:30 AM 2-Jul-2017 B comments
Closed

Installation of reinforcing steel bar embedded item and form closure Approved w/
1055 KHEP-CI-1055
inspection for RC Column (Ground Floor)
Cluster 15 B2 NA 29-Jun-2017 1-Jul-2017 9:30 AM 2-Jul-2017 B comments
Closed

First Coat, Damp Proofing Installation Inspection for RC Column Approved w/


1056 KHEP-CI-1056
neck
Cluster 75, B2 29-Jun-2017 1-Jul-2017 10:00 AM 2-Jul-2017 B comments
Closed

Line 1,
MH(21-L01)
to MH(20-
L01) and
MH(20-L01)
to MH(19-
Approved w/
1057 KHEP-CI-1057 Inspection of Sand Filling Around Pipe - Storm Maine line L01) and 29-Jun-2017 1-Jul-2017 10:30 AM 1-Jul-2017 B comments
Closed
MH(19-L01)
to MH(18-
L01) and
MH(18-L01)
to MH(17-
L01)
Zone 1B, Line
34, MH(2-
L34) to
MH(1-L34)
Back filling General Fill 4th Layer (up to existing ground level) for and MH(1- Approved w/
1058 KHEP-CI-1058
pipe trench - Sewer Maine line L34) to
29-Jun-2017 1-Jul-2017 3:00 PM 1-Jul-2017 B comments
Closed
MH(1a-L34)
and MH(1a-
L34) to
MH(7-L02)

Zone 1B, Line


31 & 32,
MH(3-L31) to
MH(2-L31)
and MH(2-
L31) to
MH(1-L31)
and MH(1- Approved w/
1059 KHEP-CI-1059 Back filling General Fill 2nd Layer for pipe trench - Sewer Maine line
L31) to
29-Jun-2017 1-Jul-2017 3:00 PM 1-Jul-2017 B comments
Closed
MH(1a-L31)
and MH(1a-
L31) to
MH(9-L02)
and MH(1-
L32) to
MH(1-L31)

Compaction test Around Footing general fill (Final layer ) Zone 1B,
1060 KHEP-CI-1060
Cluster 5
Cluster 5 Zone 1B Division 31 1-Jul-2017 2-Jul-2017 10:00 AM 2-Jul-2017 A Approved Closed

Compaction test Around Footing general fill (Final layer ) Zone 1B,
1061 KHEP-CI-1061
Cluster 10
Cluster 10 Zone 1B Division 31 1-Jul-2017 2-Jul-2017 10:00 AM 2-Jul-2017 A Approved Closed

Compaction test Around Footing general fill (Final layer ) Zone 1B,
1062 KHEP-CI-1062
Cluster 11
Cluster 11 Zone 1B Division 31 1-Jul-2017 2-Jul-2017 10:00 AM 2-Jul-2017 A Approved Closed

First Coat, Damp Proofing Installation Inspection for RC Footing &


1063 KHEP-CI-1063
Column neck Cluster 33, B2
Cluster 33, B2 NA Division 7 1-Jul-2017 2-Jul-2017 10:00 AM 4-Jul-2017 A Approved Closed

First Coat, Damp Proofing Installation Inspection for RC Footing &


1064 KHEP-CI-1064
Column neck Cluster 34, B2
Cluster 34, B2 NA Division 7 1-Jul-2017 2-Jul-2017 10:00 AM 2-Jul-2017 A Approved Closed

40cm, CMU, Mortar and Masonry Inspection Under Exterior


1065 KHEP-CI-1065
Reinforced G.B Cluster 4, A6
Cluster 4, A6 NA Division 4 1-Jul-2017 2-Jul-2017 3:00 PM 2-Jul-2017 A Approved Closed

Installation of reinforcing steel bar embedded item and form closure


1066 KHEP-CI-1066
inspection for RC Grad Beam Cluster 68, B2
Cluster 68, B2 NA Division 3 1-Jul-2017 2-Jul-2017 10:30 AM 2-Jul-2017 A Approved Closed

Concrete sampling, testing and placement inspection for RC Roof Cluster 69,
1067 KHEP-CI-1067
slab Cluster 69, B2 Mockup B2
NA Division 3 1-Jul-2017 2-Jul-2017 9:00 AM 2-Jul-2017 A Approved Closed

Concrete sampling, testing and placement inspection for RC Column


1068 KHEP-CI-1068
(Ground Floor) Cluster 2, A6
Cluster 02 A6 NA Division 3 1-Jul-2017 2-Jul-2017 9:00 AM 2-Jul-2017 A Approved Closed

Compaction test 1st layer general fill Alley 3 (sta,0+000 to 0+098)


1069 KHEP-CI-1069
(Excluding Road 1 intersection)
Alley 03 NA Division 31 1-Jul-2017 2-Jul-2017 11:00 AM 3-Jul-2017 A Approved Closed

Compaction test 1st layer general fill Alley 12 (sta,0+000 to 0+102)


1070 KHEP-CI-1070
(Excluding Road 3 intersection)
Alley 12 NA Division 31 1-Jul-2017 2-Jul-2017 3:00 PM 3-Jul-2017 A Approved Closed

Compaction test 1st layer general fill Alley 13 (sta,0+000 to 0+100)


1071 KHEP-CI-1071
(Excluding Road 3 intersection)
Alley 13 NA Division 31 1-Jul-2017 2-Jul-2017 11:00 AM 3-Jul-2017 A Approved Closed

Compaction test and Formation Existing Level Alley 1 (sta,0+000 to


1072 KHEP-CI-1072
0+115) (Excluding Road 1 intersection)
Alley 01 NA Division 31 1-Jul-2017 2-Jul-2017 3:00 PM 3-Jul-2017 E Rejected Closed

Compaction test and Formation Existing Level Alley 1 (sta,0+000 to


1072-.1 KHEP-CI-1072-01
0+115) (Excluding Road 1 intersection)
Alley 01 NA Division 31 5-Jul-2017 6-Jul-2017 3:00 PM 8-Jul-2017 A Approved Closed

Compaction test excavated formation Level bottom of Foundation Cluster 37,


1073 KHEP-CI-1073
Zone 2B, Cluster 37, BC4 BC4
Zone 2B Division 31 1-Jul-2017 2-Jul-2017 10:30 AM 4-Jul-2017 A Approved Closed

Compaction test Around Footing general fill (Final layer) Zone 1B,
1074 KHEP-CI-1074
Cluster 12
Cluster 12 Zone 1B Division 31 2-Jul-2017 3-Jul-2017 10:00 AM 4-Jul-2017 A Approved Closed

Compaction test Around Footing general fill (Final layer) Zone 1B,
1075 KHEP-CI-1075
Cluster 13
Cluster 13 Zone 1B Division 31 2-Jul-2017 3-Jul-2017 10:00 AM 4-Jul-2017 A Approved Closed

Compaction test Around Footing general fill (Final layer) Zone 1B,
1076 KHEP-CI-1076
Cluster 14
Cluster 14 Zone 1B Division 31 2-Jul-2017 3-Jul-2017 10:30 AM 4-Jul-2017 A Approved Closed

Compaction test Around Footing general fill (Final layer) Zone


1077 KHEP-CI-1077
1B, Cluster 15
Cluster 15 Zone 1B Division 31 2-Jul-2017 3-Jul-2017 10:30 AM 4-Jul-2017 A Approved Closed
40cm, CMU, Mortar and Masonry Inspection Under Exterior
1078 KHEP-CI-1078
Reinforced G.B Cluster 17, B2
Cluster 17 B2 NA Division 04 2-Jul-2017 3-Jul-2017 3:00 PM 6-Jul-2017 A Approved Closed

Installation of reinforcing steel bar embedded item and form closure


1079 KHEP-CI-1079
inspection for RC Grad beam Cluster 10, B2
Cluster 10 B2 NA Division 03 2-Jul-2017 5-Jul-2017 10:30 AM 7-Jun-2017 A Approved Closed

Installation of reinforcing steel bar embedded item and form closure


1080 KHEP-CI-1080
inspection for RC Grad beam Cluster 11, B2
Cluster 11 B2 NA Division 03 2-Jul-2017 5-Jul-2017 11:00 AM 7-Jun-2017 A Approved Closed

Cast in place concrete Form work inspection for RC Grad Beam


1081 KHEP-CI-1081
Cluster 14, B2
Cluster 14 B2 NA Division 03 2-Jul-2017 3-Jul-2017 11:00 AM 4-Jul-2017 A Approved Closed

Compaction test of Sand Filling Above the pipe trench and laying
warning tape - Sewer Maine Line Line 1, MH(21-L01) to MH(20-L01) Approved w/
1082 KHEP-CI-1082
and MH(20-L01) to MH(19-L01) and MH(19-L01) to MH(18-L01) and
Line 1 NA Division 31 2-Jul-2017 3-Jul-2017 11:00 AM 3-Jul-2017 B comments
Closed
MH(18-L01) to MH(17-L01)
Compaction test 8th layer general fill Zone 2B, Alley 6, (sta,0+000 to
1083 KHEP-CI-1083
0+155) (Excluding Road 2 intersection)
Alley 06 Zone 2B Division 31 2-Jul-2017 3-Jul-2017 11:00 AM 3-Jul-2017 A Approved Closed

Compaction test 8th layer general fill Zone 2B, Alley 4, (sta,0+000 to
1084 KHEP-CI-1084
0+114) (Excluding Road 2 intersection)
Alley 04 Zone 2B Division 31 2-Jul-2017 3-Jul-2017 11:00 AM 3-Jul-2017 A Approved Closed

Cast in place concrete Form work inspection for RC Grad Beam


1085 KHEP-CI-1085
Cluster 68, B2
Cluster 68, B2 NA Division 03 2-Jul-2017 3-Jul-2017 11:00 AM 4-Jul-2017 A Approved Closed

Compaction test 1st and final layer Structural fill (Selected fill) Zone Cluster 28,
1086 KHEP-CI-1086
2B, Cluster 28, BC4 BC4
Zone 2B Division 31 3-Jul-2017 4-Jul-2017 10:30 AM 4-Jul-2017 E Rejected Closed

Compaction test 1st and final layer Structural fill (Selected fill) Zone Cluster 28,
1086.1 KHEP-CI-1086-01
2B, Cluster 28, BC4 BC4
Zone 2B Division 31 5-Jul-2017 6-Jul-2017 10:30 AM 8-Jul-2017 A Approved Closed

Compaction test 1st and final layer Structural fill (Selected fill) Zone Cluster 29,
1087 KHEP-CI-1087
2B, Cluster 29, BC4 BC4
Zone 2B Division 31 3-Jul-2017 4-Jul-2017 10:30 AM 4-Jul-2017 A Approved Closed

Second Coat, Damp Proofing Installation Inspection for RC Grad


1088 KHEP-CI-1088
beam Cluster 69, B2 Mockup
Cluster 69, B2 NA Division 07 3-Jul-2017 4-Jul-2017 10:00 AM 4-Jul-2017 A Approved Closed

Second Coat, Damp Proofing Installation Inspection for RC Footing Cluster 75,
1089 KHEP-CI-1089
& Column neck Cluster 75, B2 B2
NA Division 07 3-Jul-2017 4-Jul-2017 10:30 AM 4-Jul-2017 A Approved Closed

Second Coat, Damp Proofing Installation Inspection for RC Footing Cluster 34,
1090 KHEP-CI-1090
& Column neck Cluster 34, B2 B2
NA Division 07 3-Jul-2017 4-Jul-2017 9:30 AM 4-Jul-2017 A Approved Closed

Cast in Place Concrete form work inspection For RC Column Ground Approved w/
1091 KHEP-CI-1091
floor Axis (B1,B2,B3,B6,C1,C2,D1,D2,D3,D6) Cluster 15, B2
Cluster 15 B2 NA Division 03 3-Jul-2017 4-Jul-2017 9:00 AM 5-Jul-2017 B comments
Closed

Concrete sampling, testing and placement inspection for RC Grad


1092 KHEP-CI-1092
Beam Cluster 13, B2
Cluster 13 B2 NA Division 03 3-Jul-2017 4-Jul-2017 9:00 AM 4-Jul-2017 A Approved Closed

40cm, CMU, Mortar and Masonry Inspection Under Exterior


1093 KHEP-CI-1093
Reinforced Grad Beam Cluster 7, B2
Cluster 7, B2 NA Division 04 3-Jul-2017 4-Jul-2017 10:00 AM 6-Jul-2017 A Approved Closed

Inspection of Sand Filling Around Pipe - Sewer Maine line Line 1, Approved w/
1094 KHEP-CI-1094
MH(17-L01) to MH(16-L01) and MH(16-L01) to MH(15-L01)
Line 1 NA Division 31 3-Jul-2017 4-Jul-2017 3:00 PM 5-Jul-2017 B comments
Closed

Compaction test 8th layer general fill Road 3, (sta,0+375 to 0+425)


1095 KHEP-CI-1095
(Excluding Road 2 intersection)
Road 3 NA Division 31 3-Jul-2017 4-Jul-2017 10:30 AM 5-Jul-2017 A Approved Closed

Compaction test 1st layer general fill Alley 1 (sta,0+110 to 0+193)


1096 KHEP-CI-1096
(Excluding Road 2 intersection)
Alley 01 NA Division 31 3-Jul-2017 4-Jul-2017 10:30 AM 5-Jul-2017 E Rejected Closed

Compaction test 2nd layer general fill Alley 1 (sta,0+115 to 0+193) Approved w/
1096.1 KHEP-CI-1096-01
(Excluding Road 2 intersection)
Alley 01 NA Division 31 8-Jul-2017 9-Jul-2017 10:30 AM 10-Jul-2017 B comments
Closed

Jobsite
1097 KHEP-CI-1097 Sampling- Aggregate sub base materials Jobsite StockPile 9
StockPile 9
NA Division 31 4-Jul-2017 5-Jul-2017 10:00 AM 6-Jul-2017 E Rejected Closed

Jobsite Approved w/
1097.1 KHEP-CI-1097-01 Sampling- Aggregate sub base materials Jobsite StockPile 9
StockPile 9
NA Division 31 9-Jul-2017 10-Jul-2017 10:30 AM 11-Jul-2017 B comments
Closed

Jobsite Approved w/
1097.2 KHEP-CI-1097-02 Sampling- Aggregate sub base materials Jobsite StockPile 9
StockPile 9
NA Division 31 24-Jul-2017 25-Jul-2017 10:30 AM 26-Jul-2017 B comments
Closed

Inspection of Sand Filling Around Pipe - Storm Maine line Zone 2B,
Line 7 & 8, MH(21-L08) to MH(26-L08) and MH(26-L08) to MH(26a-
1098 KHEP-CI-1098
L08) and MH(26a-L08) to MH(27-L07) and MH(27-L07) to MH(28-
Line 7 & 8 Zone 2B Division 31 4-Jul-2017 5-Jul-2017 3:00 PM 6-Jul-2017 E Rejected Closed
L07) a
Inspection of Sand Filling Around Pipe - Storm Maine line ( Along
Road 1 & Road 5) Zone 2B, Line 7 & 8, MH(21-L08) to MH(26-L08)
Approved w/
1098.1 KHEP-CI-1098-01 Dia.400 and MH(26-3-L08) to MH(26a-L08) Dia.500 and MH(26a- Line 7 & 8 Zone 2B Division 31 16-Jul-2017 17-Jul-2017 10:00 AM 18-Jul-2017 B comments
Closed
L08) to MH(27-L07) and MH(27-L07) to MH(28-L07) Dia.500 &
Dia.700
First Coat, Damp Proofing Installation Inspection for Cmu, Mortar
Cluster 3, A6
1099 KHEP-CI-1099 and Masonry Inspection Under Exterior Reinforced G.B Cluster 3, A6 NA Division 07 4-Jul-2017 5-Jul-2017 9:30 AM 5-Jul-2017 A Approved Closed

Installation of reinforcing steel bar embedded item and form closure Cluster 24,
1100 KHEP-CI-1100
inspection for RC Grad beam Cluster 24, BC4 BC4
NA Division 03 4-Jul-2017 5-Jul-2017 3:00 PM 5-Jul-2017 A Approved Closed
Cast in place concrete Form work inspection for RC Footing Cluster Cluster 24,
1101 KHEP-CI-1101
24, BC4 BC4
NA Division 03 4-Jul-2017 5-Jul-2017 11:00 AM 5-Jul-2017 A Approved Closed

40cm, CMU, Mortar and Masonry Inspection Under Exterior


1102 KHEP-CI-1102
Reinforced Grad beam Cluster 8, B2
Cluster 8, B2 NA Division 04 4-Jul-2017 5-Jul-2017 3:00 PM 8-Jul-2017 E Rejected Closed

40cm, CMU, Mortar and Masonry Inspection Under Exterior


1102.1 KHEP-CI-1102-01
Reinforced Grad beam Cluster 8, B2
Cluster 8, B2 NA Division 04 18-Jul-2017 19-Jul-2017 3:00 PM 20-Jul-2017 E Rejected Closed

40cm, CMU, Mortar and Masonry Inspection Under Exterior Cluster 44,
1103 KHEP-CI-1103
Reinforced Grad beam Cluster 44, A6 A6
NA Division 04 4-Jul-2017 5-Jul-2017 3:30 PM 8-Jul-2017 E Rejected Closed

40cm, CMU, Mortar and Masonry Inspection Under Exterior Cluster 44,
1103.1 KHEP-CI-1103-01
Reinforced Grad beam Cluster 44, A6 A6
NA Division 04 18-Jul-2017 19-Jul-2017 3:00 PM 22-Jul-2017 A Approved Closed

Installation of reinforcing steel bar embedded item and form closure


1104 KHEP-CI-1104 inspection for RC Column Excluding Axis ( A6,E6,C4,C5,B2,B3,D2,D3) Cluster 13 B2 NA Division 03 4-Jul-2017 5-Jul-2017 10:00 AM 7-Jun-2017 A Approved Closed
Cluster 13, B2
Compaction test 3rd layer general fill Alley 11, (sta,0+000 to 0+075)
1105 KHEP-CI-1105
(Excluding Road 1 intersection)
Alley 11 NA Division 31 4-Jul-2017 5-Jul-2017 11:00 AM 8-Jul-2017 E Rejected Closed

Compaction test 3rd layer general fill Alley 11, (sta,0+000 to 0+075)
1105.1 KHEP-CI-1105-01
(Excluding Road 1 intersection)
Alley 11 NA Division 31 10-Jul-2017 11-Jul-2017 10:00 AM 12-Jul-2017 A Approved Closed

Compaction test 9th layer general fill Alley 4, (sta,0+100 to 0+114)


1106 KHEP-CI-1106
(Excluding Road 2 intersection)
Alley 04 NA Division 31 4-Jul-2017 5-Jul-2017 11:00 AM 8-Jul-2017 A Approved Closed

Inspection of excavated formation for pipe trench Storm Maine line


Approved w/
1107 KHEP-CI-1107 Zone 2B, Line 18, MH(62-L18) to MH(63-L18) and MH(63-L18) to Line 18 Zone 2B Division 31 4-Jul-2017 5-Jul-2017 10:30 AM 6-Jul-2017 B comments
Closed
MH(64-L18) and MH(64-L18) to MH(74-L18)
Compaction test 1st and final layer Structural fill (Selected fill) Zone Cluster 37,
1108 KHEP-CI-1108
2B, Cluster 37, BC4 BC4
Zone 2B Division 31 5-Jul-2017 6-Jul-2017 11:15 AM 8-Jul-2017 A Approved Closed

Compaction test excavated formation Level bottom of Foundation Cluster 60,


1109 KHEP-CI-1109
Zone 3B, Cluster 60, BC4 BC4
Zone 3B Division 31 5-Jul-2017 6-Jul-2017 11:00 AM 8-Jul-2017 E Rejected Closed

Compaction test excavated formation Level bottom of Foundation Cluster 60,


1109.1 KHEP-CI-1109-01
Zone 3B, Cluster 60, BC4 BC4
Zone 3B Division 31 9-Jul-2017 10-Jul-2017 11:00 AM 11-Jul-2017 A Approved Closed

Installation of reinforcing steel bar embedded item and form closure Cluster 78,
1110 KHEP-CI-1110
inspection for RC Column neck Cluster 78, BC4 BC4
NA Division 03 5-Jul-2017 6-Jul-2017 11:00 AM 8-Jul-2017 A Approved Closed

Cast in place concrete Form work inspection for RC Column neck Cluster 9,
1111 KHEP-CI-1111
Cluster 9, BC4 BC4
NA Division 03 5-Jul-2017 6-Jul-2017 3:00 PM 8-Jul-2017 A Approved Closed

Second Coat, Damp Proofing Installation Inspection for RC Footing Cluster 33,
1112 KHEP-CI-1112
& Column neck Cluster 33, B2 B2
NA Division 07 5-Jul-2017 6-Jul-2017 10:00 AM 8-Jul-2017 A Approved Closed

First Coat, Damp Proofing Installation Inspection for Cmu, Mortar


1113 KHEP-CI-1113 and Masonry Inspection Under Exterior Reinforced Grad beam Cluster 17 B2 NA Division 07 5-Jul-2017 6-Jul-2017 9:30 AM 8-Jul-2017 A Approved Closed
Cluster 17, B2
Damp Proofing surface Preparation for RC Foundation & Column
1114 KHEP-CI-1114
Neck Cluster 61, B2
Cluster 61, B2 NA Division 07 5-Jul-2017 6-Jul-2017 10:30 AM 8-Jul-2017 A Approved Closed

Compaction test of Sand Filling Above the pipe trench and laying
1115 KHEP-CI-1115 warning tape Swear Maine Line Zone 4B, Line 1, MH-L01 to MH-16- Line 1 Zone 4B Division 31 5-Jul-2017 6-Jul-2017 10:30 AM 8-Jul-2017 A Approved Closed
L01 and MH-16-L01 to MH-15-L01
Back filling General Fill 1st Layer for pipe trench - Sewer Maine line
Zone 4B, Line 1, MH(21-L01) to MH(20-L01) and MH(20-L01) to
1116 KHEP-CI-1116
MH(19-L01) and MH(19-L01) to MH(18-L01) and MH(18-L01) to
Line 1 Zone 4B Division 31 5-Jul-2017 6-Jul-2017 10:30 AM 8-Jul-2017 A Approved Closed
MH(17-L01)
First Coat, Damp Proofing Installation Inspection for Cmu, Mortar
1117 KHEP-CI-1117 and Masonry Inspection Under Exterior Reinforced Grad beam Cluster 4, A6 NA Division 07 5-Jul-2017 6-Jul-2017 10:30 AM 8-Jul-2017 E Rejected Closed
Cluster 4, A6
First Coat, Damp Proofing Installation Inspection for Cmu, Mortar
1117.1 KHEP-CI-1117-01 and Masonry Inspection Under Exterior Reinforced Grad beam Cluster 4, A6 NA Division 07 10-Jul-2017 11-Jul-2017 10:30 AM 12-Jul-2017 A Approved Closed
Cluster 4, A6
Compaction test 9th layer general fill Alley 6, (sta,0+100 to 0+155)
1118 KHEP-CI-1118
(Excluding Road 2 intersection)
Alley 06 NA Division 31 5-Jul-2017 6-Jul-2017 11:15 AM 8-Jul-2017 A Approved Closed

Inspection of excavated formation for pipe trench Sewer Maine line


Zone 2B, Line 12 & 11, MH(3-L12) to MH(2-L12) and MH(2-L12) to
1119 KHEP-CI-1119
MH(1-L12) and MH(1-L12) to MH(12-L01) and MH(1-L11) to MH(1a-
Line 12 & 11 Zone 2B Division 31 5-Jul-2017 6-Jul-2017 11:00 AM 8-Jul-2017 A Approved Closed
L11) and MH(1a-L11) to MH(2-L12)
Compaction test of Sand Bedding Under Pipe Trench - Storm Maine
1120 KHEP-CI-1120 Line Zone 2B, Line 18, MH(62-L18) to MH(63-L18) and MH(63-L18) Line 18 Zone 2B Division 31 5-Jul-2017 6-Jul-2017 3:30 PM 8-Jul-2017 A Approved Closed
to MH(64-L18) and MH(64-L18) to MH(74-L18)
Inspection of excavated formation for pipe trench Storm Maine line
1121 KHEP-CI-1121 400mm Dia. (Along Road 1) Zone 2B, Line 1, MH(3-L01) to MH(6- Line 1 Zone 2B Division 31 6-Jul-2017 8-Jul-2017 10:00 AM 9-Jul-2017 E Rejected Closed
L01) and MH(6-L01) to MH(132-L35)
Inspection of excavated formation for pipe trench Storm Maine line
1121.1 KHEP-CI-1121-01 Zone 2B, Line 1, MH(3-L01) to MH(6-L01) and MH(6-L01) to Line 1 Zone 2B Division 31 10-Jul-2017 11-Jul-2017 10:00 AM 12-Jul-2017 B Approved Closed
MH(132-L35)
Inspection of excavated formation for pipe trench Sewer Maine line
200mm Dia. (Along Alley 4) Zone 2B, Line 30 & 29, MH(3-L30) to Approved w/
1122 KHEP-CI-1122
MH(2-L30) and MH(2-L30) to MH(1-L30) and MH(1-L30) to MH(1a-
Line 30 & 29 Zone 2B Division 31 6-Jul-2017 8-Jul-2017 10:45 AM 10-Jul-2017 B comments
Closed
L29) and MH(1a-L29) to MH(1-L29)

Inspection of Sand filling around the Pipe Sewer Maine line 200mm
Dia. (Along Alley 5) Zone 2B, Line 5 & 15, MH(3-L09) to MH(2-L09)
1123 KHEP-CI-1123
and MH(2-L09) to MH(1-L09) and MH(1-L09) to MH(1a-L09) and
Line 5 & 15 Zone 2B Division 31 6-Jul-2017 8-Jul-2017 10:15 AM 9-Jul-2017 E Rejected Closed
MH(1a-L10) to MH(1a-L10) and MH(1a-L10) to MH(1a-L09)

Inspection of Sand filling around the Pipe Sewer Maine line Zone 2B,
Line 09 & 10, MH(3-L09) to MH(2-L09) and MH(2-L09) to MH(1-
1123.1 KHEP-CI-1123-01
L09) and MH(1-L09) to MH(1a-L09) and MH(1a-L10) to MH(1a-L10)
Line 9 & 10 Zone 2B Division 31 10-Jul-2017 11-Jul-2017 10:30 AM 12-Jul-2017 B Approved Closed
and MH(1a-L10) to MH(1a-L09)
Concrete sampling, testing and placement inspection for RC Grad
1124 KHEP-CI-1124
Beam Cluster 14, B2
Cluster 14 B2 NA Division 03 6-Jul-2017 8-Jul-2017 9:00 AM 8-Jul-2017 A Approved Closed

Concrete sampling, testing and placement inspection for RC Grad


1125 KHEP-CI-1125
Beam Cluster 68, B2
Cluster 68, B2 NA Division 03 6-Jul-2017 8-Jul-2017 9:00 AM 8-Jul-2017 A Approved Closed

Installation of reinforcing steel bar embedded item and form closure Cluster 23,
1126 KHEP-CI-1126
inspection for RC Footing Cluster 23, BC4 BC4
NA Division 03 6-Jul-2017 8-Jul-2017 11:00 AM 8-Jul-2017 A Approved Closed

Cast in place concrete Form work inspection for RC Footing Cluster Cluster 23,
1127 KHEP-CI-1127
23, BC4 BC4
NA Division 03 6-Jul-2017 8-Jul-2017 3:00 PM 8-Jul-2017 A Approved Closed

Concrete sampling, testing and placement inspection for RC Footing Cluster 24,
1128 KHEP-CI-1128
Cluster 24, BC4 BC4
NA Division 03 6-Jul-2017 8-Jul-2017 9:00 AM 8-Jul-2017 A Approved Closed

Installation of reinforcing steel bar embedded item and form closure


1129 KHEP-CI-1129 inspection for RC Column Ground Floor Excluding Axis ( B2 ,B3, D2, Cluster 14 B2 NA Division 03 6-Jul-2017 8-Jul-2017 10:00 AM 8-Jul-2017 A Approved Closed
D3, A6, E6) Cluster 14, B2
Cast in place concrete Form work inspection for RC Column neck
1130 KHEP-CI-1130
(Ground Floor) Cluster 13, B2
Cluster 13 B2 NA Division 03 6-Jul-2017 8-Jul-2017 11:00 AM 8-Jul-2017 A Approved Closed

Second Coat, Damp Proofing Installation Inspection for Cmu, Mortar


1131 KHEP-CI-1131 and Masonry Inspection Under Exterior Reinforced Grad beam Cluster 3, A6 NA Division 07 8-Jul-2017 9-Jul-2017 9:30 AM 10-Jul-2017 A Approved Closed
Cluster 3, A6
Damp Proofing surface Preparation for RC Foundation & Column
1132 KHEP-CI-1132
Neck Cluster 48, B2
Cluster 48, B2 NA Division 07 8-Jul-2017 9-Jul-2017 10:00 AM 10-Jul-2017 A Approved Closed

Damp Proofing surface Preparation for RC Foundation & Column


1133 KHEP-CI-1133
Neck Cluster 35, B2
Cluster 35, B2 NA Division 07 8-Jul-2017 9-Jul-2017 10:00 AM 10-Jul-2017 A Approved Closed

Second Coat, Damp Proofing Installation Inspection for Cmu, Mortar


1134 KHEP-CI-1134 and Masonry Inspection Under Exterior Reinforced Grad beam Cluster 17 B2 NA Division 07 8-Jul-2017 9-Jul-2017 10:30 AM 10-Jul-2017 A Approved Closed
Cluster 17, B2
Second Coat, Damp Proofing Installation Inspection for Cmu, Mortar
1135 KHEP-CI-1135 and Masonry Inspection Under Exterior Reinforced Grad beam Cluster 4, A6 NA Division 07 8-Jul-2017 9-Jul-2017 10:30 AM 11-Jul-2017 E Rejected Closed
Cluster 4, A6
Second Coat, Damp Proofing Installation Inspection for Cmu, Mortar
1135 KHEP-CI-1135-01 and Masonry Inspection Under Exterior Reinforced Grad beam Cluster 4, A6 NA Division 07 12-Jul-2017 13-Jul-2017 10:30 AM 15-Jul-2017 A Approved Closed
Cluster 4, A6
Installation of reinforcing steel bar embedded item and form closure Cluster 24,
1136 KHEP-CI-1136
inspection for RC Column neck Cluster 24, BC4 BC4
NA Division 03 8-Jul-2017 9-Jul-2017 3:00 PM 10-Jul-2017 A Approved Closed

Cast in place concrete Form work inspection for RC Column neck Cluster 21,
1137 KHEP-CI-1137
Cluster 21, BC4 BC4
NA Division 03 8-Jul-2017 9-Jul-2017 3:00 PM 10-Jul-2017 A Approved Closed

Inspection of excavated formation for pipe trench Storm Maine line


Approved w/
1138 KHEP-CI-1138 Zone 4B, Line 22, MH(89-L22) to MH(90-L22) and MH(90-L22) to Line 22 Zone 4B Division 31 8-Jul-2017 9-Jul-2017 11:00 AM 10-Jul-2017 B comments
Closed
MH(91-L232) and MH(91-L22) to MH(91a-L22)
Inspection of excavated formation for pipe trench Sewer Maine line
Approved w/
1139 KHEP-CI-1139 Zone 2B, Line 30, MH(1-L30) to MH(1a-L30) and MH(1a-L30) to Line 30 Zone 2B Division 31 8-Jul-2017 9-Jul-2017 11:00 AM 10-Jul-2017 B comments
Closed
MH(11-L02)
Back filling General Fill 2nd Layer for pipe trench - Sewer Maine line
Zone 4B, Line 1, MH(21-L01) to MH(20-L01) and MH(20-L01) to Approved w/
1140 KHEP-CI-1140
MH(19-L01) and MH(19-L01) to MH(18-L01) and MH(18-L01) to
Line 1 Zone 2B Division 31 8-Jul-2017 9-Jul-2017 10:30 AM 10-Jul-2017 B comments
Closed
MH(17-L01)
Back filling General Fill 1st Layer for pipe trench - Sewer Maine line
Approved w/
1141 KHEP-CI-1141 Zone 4B, Line 1, MH(17-L01) to MH(16-L01) and MH(16-L01) to Line 1 Zone 2B Division 31 8-Jul-2017 9-Jul-2017 10:30 AM 10-Jul-2017 B comments
Closed
MH(15-L01)
Compaction test 6th layer general fill Road no 3, (sta,0+375 to Approved w/
1142 KHEP-CI-1142
0+425) (Excluding Road 2 intersection)
Road 3 NA Division 31 8-Jul-2017 9-Jul-2017 10:30 AM 10-Jul-2017 B comments
Closed

Compaction test 1st layer general fill Alley 6, (sta,0+000 to 0+155) Approved w/
1143 KHEP-CI-1143
(Excluding Road 2 intersection)
Alley 01 NA Division 31 8-Jul-2017 9-Jul-2017 10:45 AM 10-Jul-2017 B comments
Closed
Cast in place concrete Form work inspection for RC Column (Ground
1144 KHEP-CI-1144
floor) Excluding (B1,B2,B3,B6,C1,D1,D2,D3,D6) Cluster 15, B2
Cluster 15 B2 NA Division 03 8-Jul-2017 9-Jul-2017 10:00 AM 9-Jul-2017 A Approved Closed

Inspection of excavated formation for pipe trench Storm Maine line


1145 KHEP-CI-1145
Zone 1B, Line 10, MH(131-L10) to MH(32-L10)
Line 10 Zone 1B Division 31 9-Jul-2017 10-Jul-2017 11:00 AM 11-Jul-2017 A Approved Closed

Compaction test of Sand Bedding Under Pipe Trench - Sewer Maine


Line Zone 2B, Line 30 & 29, MH(3-L30) to MH(2-L30) and MH(2-
Approved w/
1146 KHEP-CI-1146 L30) to MH(1-L30) and MH(1-L30) to MH(1a-L30) and MH(1a-L30) Line 30 & 29 Zone 2B Division 31 9-Jul-2017 10-Jul-2017 3:30 PM 11-Jul-2017 B comments
Closed
to MH(11-L02) and MH(1-L29) to MH(1a-L29) and MH(1a-L29) to
MH(1-L30)

Compaction test of Sand Bedding Under Pipe Trench - Sewer Maine


Line Zone 2B, Line 12 & 11, MH(3-L12) to MH(2-L12) and MH(2- Approved w/
1147 KHEP-CI-1147
L12) to MH(1-L12) and MH(1-L12) to MH(12-L01) and MH(1-L11) to
Line 12 & 11 Zone 2B Division 31 9-Jul-2017 10-Jul-2017 11:00 AM 11-Jul-2017 B comments
Closed
MH(1a-L11) and MH(1a-L11) to MH(2-L12) a

Compaction test 10th layer general fill Alley 6, (sta,0+100 to 0+155)


1148 KHEP-CI-1148
(Excluding Road 2 intersection)
Alley 06 NA Division 31 9-Jul-2017 10-Jul-2017 11:15 AM 11-Jul-2017 E Rejected Closed

Compaction test 7th layer general fill Alley 2, (sta,0+000 to 0+117)


1149 KHEP-CI-1149
(Excluding Road 2 intersection) Alley 11, (sta,0+075 to 0+100)
Alley 02,11 NA Division 31 9-Jul-2017 10-Jul-2017 11:00 AM 11-Jul-2017 A Approved Closed

Compaction test excavated formation Level bottom of Foundation Cluster 76,


1150 KHEP-CI-1150
Zone 4B, Cluster 76, BC4 BC4
Zone 4B Division 31 9-Jul-2017 10-Jul-2017 3:00 PM 12-Jul-2017 A Approved Closed

Compaction test Around Footing general fill (Final layer) Zone 4B,
1151 KHEP-CI-1151
Cluster 68
Cluster 68 Zone 4B Division 31 9-Jul-2017 10-Jul-2017 10:30 AM 11-Jul-2017 A Approved Closed

Installation of reinforcing steel bar embedded item and form closure


1152 KHEP-CI-1152 inspection for RC Column Ground Floor ( A6 ,E6, C4, C5, B2, B3, D2, Cluster 13 B2 NA Division 03 9-Jul-2017 10-Jul-2017 10:00 AM 11-Jul-2017 A Approved Closed
D3) Cluster 13, B2
Concrete sampling, testing and placement inspection for RC Column
1153 KHEP-CI-1153
Ground Floor Cluster 15, B2
Cluster 15 B2 NA Division 03 9-Jul-2017 10-Jul-2017 9:00 AM 11-Jul-2017 A Approved Closed

Cast in place concrete Form work inspection for RC Column Ground


1154 KHEP-CI-1154
Floor Axis ( B2, B3, D2, D3, A6, E6, C4, C5) Cluster 13, B2
Cluster 13 B2 NA Division 03 9-Jul-2017 11-Jul-2017 10:00 AM 13-Jul-2017 A Approved Closed

Cast in place concrete Form work inspection for RC First Floor slab
1155 KHEP-CI-1155
Cluster 1, A6
Cluster 01 A6 NA Division 03 9-Jul-2017 10-Jul-2017 10:00 AM 12-Jul-2017 A Approved Closed

Cast in place concrete Form work inspection for RC Column Ground


1156 KHEP-CI-1156 Floor Excluding Axis ( B2, B3, D2, D3, A6, E6, A3, E3, C2) Cluster 14, Cluster 14 B2 NA Division 03 9-Jul-2017 10-Jul-2017 10:00 AM 11-Jul-2017 A Approved Closed
B2
Termite control surface preparation, installation and final inspection Cluster 29,
1157 KHEP-CI-1157
for PC foundation Cluster 29, BC4 BC4
NA Division 03 9-Jul-2017 10-Jul-2017 10:30 AM 11-Jul-2017 A Approved Closed

Blinding concrete sampling, Testing & placement inspection for Cluster 29,
1158 KHEP-CI-1158
Footing Cluster 29, BC4 BC4
NA Division 03 9-Jul-2017 10-Jul-2017 1:30 PM 12-Jul-2017 A Approved Closed

Termite control surface preparation, installation and final inspection Cluster 81,
1159 KHEP-CI-1159
for Grad Beam Cluster 81, A6 A6
NA Division 03 9-Jul-2017 10-Jul-2017 10:30 AM 11-Jul-2017 E Rejected Closed

Termite control surface preparation, installation and final inspection Cluster 81,
1159.1 KHEP-CI-1159-01
for Grad Beam Cluster 81, A6 A6
NA Division 03 30-Jul-2017 31-Jul-2017 10:30 AM 1-Aug-2017 E Rejected Closed

Termite control surface preparation, installation and final inspection Cluster 81,
1159.2 KHEP-CI-1159-02
for Grad Beam Cluster 81, A6 A6
NA Division 03 6-Aug-2017 7-Aug-2017 10:30 AM 13-Aug-2017 A Approved Closed

Blinding concrete sampling, Testing & placement inspection for Grad Cluster 81,
1160 KHEP-CI-1160
Beam Cluster 81, A6 A6
NA Division 03 9-Jul-2017 10-Jul-2017 1:30 PM 11-Jul-2017 E Rejected Closed

Blinding concrete sampling, Testing & placement inspection for Grad Cluster 81,
1160.1 KHEP-CI-1160-01
Beam Cluster 81, A6 A6
NA Division 03 30-Jul-2017 31-Jul-2017 3:00 PM 1-Aug-2017 E Rejected Closed

Blinding concrete sampling, Testing & placement inspection for Grad Cluster 81,
1160.2 KHEP-CI-1160-02
Beam Cluster 81, A6 A6
NA Division 03 6-Aug-2017 7-Aug-2017 10:30 AM 13-Aug-2017 A Approved Closed

Termite control surface preparation, installation and final inspection Cluster 28,
1161 KHEP-CI-1161
for Footing Cluster 28, BC4 BC4
NA Division 03 10-Jul-2017 11-Jul-2017 10:30 AM 13-Jul-2017 E Rejected Closed

Termite control surface preparation, installation and final inspection Cluster 28,
1161.1 KHEP-CI-1161-01
for Footing Cluster 28, BC4 BC4
NA Division 03 15-Jul-2017 16-Jul-2017 10:30 AM 17-Jul-2017 A Approved Closed

Blinding concrete sampling, Testing & placement inspection for Cluster 28,
1162 KHEP-CI-1162
Footing Cluster 28, BC4 BC4
NA Division 03 10-Jul-2017 11-Jul-2017 3:00 PM 13-Jul-2017 E Rejected Closed

Blinding concrete sampling, Testing & placement inspection for Cluster 28,
1162.1 KHEP-CI-1162-01
Footing Cluster 28, BC4 BC4
NA Division 03 15-Jul-2017 16-Jul-2017 10:30 AM 17-Jul-2017 A Approved Closed

Installation of reinforcing steel bar embedded item and form closure Cluster 23,
1163 KHEP-CI-1163
inspection for RC Column neck Cluster 23, BC4 BC4
NA Division 03 10-Jul-2017 11-Jul-2017 10:30 AM 12-Jul-2017 A Approved Closed

Installation of reinforcing steel bar embedded item and form closure


1164 KHEP-CI-1164 inspection for RC Column neck Ground Floor ( B2, B3, D2, D3, A6, Cluster 14 B2 NA Division 03 10-Jul-2017 11-Jul-2017 10:00 AM 12-Jul-2017 A Approved Closed
E6) Cluster 14, B2
Cast in place concrete Form work inspection for RC Grad Beam
1165 KHEP-CI-1165
Cluster 12, B2
Cluster 12 B2 NA Division 03 10-Jul-2017 11-Jul-2017 9:30 AM 12-Jul-2017 E Rejected Closed

Cast in place concrete Form work inspection for RC Grad Beam


1165.1 KHEP-CI-1165-01
Cluster 12, B2
Cluster 12 B2 NA Division 03 13-Jul-2017 16-Jul-2017 10:30 AM 17-Jul-2017 A Approved Closed

Cast in place concrete Form work inspection for RC First Floor Stair
1166 KHEP-CI-1166
( First Flight) Cluster 15, B2
Cluster 15 B2 NA Division 03 10-Jul-2017 11-Jul-2017 9:30 AM 13-Jul-2017 E Rejected Closed

Cast in place concrete Form work inspection for RC Ground Floor Approved w/
1166.1 KHEP-CI-1166-01
Stair ( First Flight) Cluster 15, B2
Cluster 15 B2 NA Division 03 15-Jul-2017 16-Jul-2017 9:30 AM 18-Jul-2017 B comments
Closed

Cast in place concrete Form work inspection for RC Column neck


1167 KHEP-CI-1167 Ground Floor Axis ( B2, B3, D2, D3, A6, E6, A3, E3, C2) Cluster 14, Cluster 14 B2 NA Division 03 10-Jul-2017 12-Jul-2017 9:30 AM 13-Jul-2017 A Approved Closed
B2
Concrete sampling, testing and placement inspection for RC Footing Cluster 23,
1168 KHEP-CI-1168
Cluster 23, BC4 BC4
NA Division 03 10-Jul-2017 11-Jul-2017 9:00 AM 11-Jul-2017 A Approved Closed

Compaction test of Sand Bedding Under Pipe Trench - Storm Maine


Approved w/
1169 KHEP-CI-1169 Line Zone 4B, Line 22, MH(89-L22) to MH(90-L22) and MH(90-L22) Line 22 Zone 4B Division 31 10-Jul-2017 11-Jul-2017 10:30 AM 12-Jul-2017 B comments
Closed
to MH(91-L22)
Compaction test 2nd layer general fill Alley 1, (sta,0+000 to 0+155)
1170 KHEP-CI-1170
(Excluding Road 2 intersection)
Alley 01 NA Division 31 10-Jul-2017 11-Jul-2017 11:00 AM 12-Jul-2017 A Approved Closed

Inspection of Sand filling around the Pipe Sewer Maine line Zone 2B, Approved w/
1171 KHEP-CI-1171
Line 9 , MH(1a-L09) to MH(9-L01)
Line 9 Zone 2B Division 31 10-Jul-2017 11-Jul-2017 10:30 AM 12-Jul-2017 B comments
Closed

Inspection of Sand filling around the Pipe Sewer Maine line Zone 2B,
Approved w/
1172 KHEP-CI-1172 Line 2 , MH(22-L02) to MH(21-L02) and MH(21-L02) to MH(20-L02) Line 2 Zone 2B Division 31 10-Jul-2017 11-Jul-2017 10:30 AM 12-Jul-2017 B comments
Closed
and MH(20-L02) to MH(19-L02) and MH(19-L02) to MH(18-L02)

Installation of reinforcing steel bar embedded item and form closure


1173 KHEP-CI-1173
inspection for RC Column Ground Floor Cluster 68, B2
Cluster 68, B2 NA Division 03 10-Jul-2017 11-Jul-2017 9:00 AM 11-Jul-2017 A Approved Closed

Installation of reinforcing steel bar embedded item and form closure


1174 KHEP-CI-1174
inspection for RC First Floor Slab Cluster 1, A6
Cluster 01 A6 NA Division 03 10-Jul-2017 11-Jul-2017 10:30 AM 12-Jul-2017 A Approved Closed

Compaction test and formation existing Level Alley 9, (sta,0+135 to


1175 KHEP-CI-1175
0+208) (Excluding Road 2 intersection)
Alley 09 NA Division 31 10-Jul-2017 11-Jul-2017 3:00 PM 13-Jul-2017 A Approved Closed

Compaction test and formation existing Level Alley 16, (sta,0+000 to


1176 KHEP-CI-1176 0+106) (Excluding Alley 8 & 9 intersection) and Alley 17, Alley 16,17 NA Division 31 10-Jul-2017 11-Jul-2017 3:00 PM 13-Jul-2017 A Approved Closed
(sta,0+000 to 0+106)
Concrete sampling, testing and placement inspection for RC Column Cluster 21,
1177 KHEP-CI-1177
neck Cluster 21, BC4 BC4
NA Division 03 11-Jul-2017 12-Jul-2017 9:00 AM 13-Jul-2017 A Approved Closed

Concrete sampling, testing and placement inspection for RC Column Cluster 9,


1178 KHEP-CI-1178
neck Cluster 9, BC4 BC4
NA Division 03 11-Jul-2017 12-Jul-2017 9:00 AM 13-Jul-2017 A Approved Closed

Concrete sampling, testing and placement inspection for RC Column


1179 KHEP-CI-1179
Ground Floor Cluster 13, B2
Cluster 13 B2 NA Division 03 11-Jul-2017 12-Jul-2017 10:00 AM 13-Jul-2017 A Approved Closed

First Coat, Damp Proofing Installation Inspection for RC Footing & Cluster 54,
1180 KHEP-CI-1180
Column neck Cluster 54, B2 B2
NA Division 03 11-Jul-2017 12-Jul-2017 10:00 AM 13-Jul-2017 A Approved Closed

First Coat, Damp Proofing Installation Inspection for RC Footing & Cluster 58,
1181 KHEP-CI-1181
Column neck Cluster 58, B2 B2
NA Division 03 11-Jul-2017 12-Jul-2017 10:00 AM 13-Jul-2017 A Approved Closed

Damp Proofing surface Preparation for RC Foundation & Column


1182 KHEP-CI-1182
Neck Cluster 61, B2
Cluster 61, B2 NA Division 03 11-Jul-2017 12-Jul-2017 10:30 AM 15-Jul-2017 A Approved Closed

Termite control surface preparation, installation and final inspection Cluster 66,
1183 KHEP-CI-1183
for Grad Beam Cluster 66, A6 A6
NA Division 03 11-Jul-2017 12-Jul-2017 10:30 AM 15-Jul-2017 E Rejected Closed

Termite control surface preparation, installation and final inspection Cluster 66,
1183.1 KHEP-CI-1183-01
for Grad Beam Cluster 66, A6 A6
NA Division 03 17-Jul-2017 18-Jul-2017 10:30 AM 20-Jul-2017 A Approved Closed

Blinding concrete sampling, Testing & placement inspection for Grad Cluster 66,
1184 KHEP-CI-1184
Beam Cluster 66, A6 A6
NA Division 03 11-Jul-2017 12-Jul-2017 3:00 PM 15-Jul-2017 E Rejected Closed

Blinding concrete sampling, Testing & placement inspection for Grad Cluster 66,
1184.1 KHEP-CI-1184-01
Beam Cluster 66, A6 A6
NA Division 03 17-Jul-2017 18-Jul-2017 11:00 AM 20-Jul-2017 A Approved Closed

Compaction test of Sand Bedding Under Pipe Trench - Storm Maine Approved w/
1185 KHEP-CI-1185
Line Zone 1B, Line 10, MH(131-L10) to MH(32-L10)
Line 10 Zone 1B Division 31 11-Jul-2017 12-Jul-2017 3:00 PM 13-Jul-2017 B comments
Closed

Compaction test of Sand Bedding Under Pipe Trench - Storm Maine


Approved w/
1186 KHEP-CI-1186 Line Zone 2B, Line 01, MH(3-L01) to MH(6-L01) and MH(6-L01) to Line 1 Zone 2B Division 31 11-Jul-2017 12-Jul-2017 3:00 PM 13-Jul-2017 B comments
Closed
MH(132-L35)
Inspection of excavated formation for pipe trench Storm Maine line
1187 KHEP-CI-1187
Zone 4B, Line 22, MH(91a-L22) to MH(92-L21)
Line 22 Zone 4B Division 31 11-Jul-2017 12-Jul-2017 11:00 AM 13-Jul-2017 A Approved Closed

Compaction test 7th layer general fill Road 3, (sta,0+375 to 0+425)


1188 KHEP-CI-1188
(Excluding Road 2 intersection)
Road 3 NA Division 31 11-Jul-2017 12-Jul-2017 11:30 AM 13-Jul-2017 A Approved Closed

Installation of reinforcing steel bar embedded item and form closure Cluster 69,
1189 KHEP-CI-1189
inspection for RC Up stand Cluster 69, Mockup Mockup
NA Division 03 11-Jul-2017 12-Jul-2017 3:00 PM 13-Jul-2017 E Rejected Closed

Installation of reinforcing steel bar embedded item and form closure Cluster 69,
1189.1 KHEP-CI-1189-01
inspection for RC Up stand Cluster 69, Mockup Mockup
NA Division 03 16-Jul-2017 17-Jul-2017 9:30 AM 18-Jul-2017 A Approved Closed
Cast in place concrete Form work inspection for RC Up stand Cluster Cluster 69,
1190 KHEP-CI-1190
69, B2 Mockup B2 Mockup
NA Division 03 11-Jul-2017 12-Jul-2017 3:00 PM 13-Jul-2017 E Rejected Closed

Cast in place concrete Form work inspection for RC Up stand Cluster Cluster 69,
1190.1 KHEP-CI-1190-01
69, B2 Mockup B2 Mockup
NA Division 03 16-Jul-2017 17-Jul-2017 9:00 AM 18-Jul-2017 A Approved Closed

Cast in place concrete Form work inspection for RC Column Ground Cluster 68,
1191 KHEP-CI-1191
Floor Cluster 68, B2 B2
NA Division 03 11-Jul-2017 12-Jul-2017 3:00 PM 15-Jul-2017 A Approved Closed

Inspection of excavated formation for pipe trench Sewer Maine line


1192 KHEP-CI-1192
Zone 4B, Line 17, MH(1-L17) to MH(17-L01)
Line 17 Zone 4B Division 31 11-Jul-2017 12-Jul-2017 11:15 AM 13-Jul-2017 A Approved Closed

First Coat, Damp Proofing Installation Inspection for RC Footing & Cluster 35,
1193 KHEP-CI-1193
Column neck Cluster 35, B2 B2
NA Division 07 12-Jul-2017 13-Jul-2017 10:00 AM 15-Jul-2017 A Approved Closed

First Coat, Damp Proofing Installation Inspection for RC Footing & Cluster 48,
1194 KHEP-CI-1194
Column neck Cluster 48, B2 B2
NA Division 07 12-Jul-2017 13-Jul-2017 10:00 AM 15-Jul-2017 A Approved Closed

Cast in place concrete Form work inspection for RC Footing Cluster Cluster 29,
1195 KHEP-CI-1195
29, BC4 BC4
NA Division 03 12-Jul-2017 13-Jul-2017 11:00 AM 15-Jul-2017 A Approved Closed

Installation of reinforcing steel bar embedded item and form closure Cluster 29,
1196 KHEP-CI-1196
inspection for RC Footing Cluster 29, BC4 BC4
NA Division 03 12-Jul-2017 13-Jul-2017 11:00 AM 15-Jul-2017 A Approved Closed

Cast in place concrete Form work inspection for RC Grad Beam


1197 KHEP-CI-1197
Cluster 11, B2
Cluster 11 B2 NA Division 03 12-Jul-2017 13-Jul-2017 3:00 PM 15-Jul-2017 E Rejected Closed

Cast in place concrete Form work inspection for RC Grad Beam


1197.1 KHEP-CI-1197-01
Cluster 11, B2
Cluster 11 B2 NA Division 03 16-Jul-2017 17-Jul-2017 10:00 AM 18-Jul-2017 A Approved Closed

Compaction test 1st and final layer Structural fill (Selected fill) Zone Cluster 76,
1198 KHEP-CI-1198
4B, Cluster 76, BC4 BC4
Zone 4B Division 31 12-Jul-2017 13-Jul-2017 3:00 PM 15-Jul-2017 A Approved Closed

Compaction test 1st and final layer Structural fill (Selected fill) Zone Cluster 60,
1199 KHEP-CI-1199
3B, Cluster 60, BC4 BC4
Zone 3B Division 31 12-Jul-2017 13-Jul-2017 11:30 AM 15-Jul-2017 A Approved Closed

Compaction test 4th layer general fill Alley 11, (sta,0+000 to 0+075)
1200 KHEP-CI-1200
(Excluding Alley 1 intersection)
Alley 11 NA Division 31 12-Jul-2017 13-Jul-2017 11:00 AM 15-Jul-2017 A Approved Closed

Inspection of excavated and Compaction formation for pipe trench


Storm Maine line Zone
1201 KHEP-CI-1201
3B, Line 30, MH(106-L30) to MH(107-L30) and MH(107-L30) to
Line 30 Zone 3B Division 31 12-Jul-2017 13-Jul-2017 11:00 AM 15-Jul-2017 A Approved Closed
MH(107a-L30) and MH(107a-L30) to MH(108-L27)
Inspection of excavated and Compaction formation for pipe trench
Sewer Maine line Zone
1202 KHEP-CI-1202 3B, Line 27, MH(5-L27) to MH(4-L27) and MH(4-L27) to MH(3-L27) Line 27 Zone 3B Division 31 12-Jul-2017 13-Jul-2017 11:00 AM 15-Jul-2017 A Approved Closed
and MH(3-L27) to MH(2-L27) and MH(2-L27) to MH(1-L27) and
MH(1-L27) to MH(13-L02)
Inspection of excavated and Compaction formation for pipe trench
Sewer Maine line Zone
1203 KHEP-CI-1203
3B, Line 28, MH(1-L28) to MH(1a-L28) and MH(1a-L28) to MH(2-
Line 28 Zone 3B Division 31 12-Jul-2017 13-Jul-2017 11:00 AM 15-Jul-2017 A Approved Closed
L27)
Second Coat, Damp Proofing Installation Inspection for RC Footing
Cluster 54,
1204 KHEP-CI-1204 & Column neck
B2
NA Division 07 13-Jul-2017 15-Jul-2017 10:00 AM 16-Jul-2017 A Approved Closed
Cluster 54, B2
Second Coat, Damp Proofing Installation Inspection for RC Footing
Cluster 58,
1205 KHEP-CI-1205 & Column neck
B2
NA Division 07 13-Jul-2017 15-Jul-2017 10:00 AM 16-Jul-2017 A Approved Closed
Cluster 58, B2
Cast in place concrete Form work inspection for RC Column neck
Cluster 24,
1206 KHEP-CI-1206
BC4
NA Division 03 13-Jul-2017 16-Jul-2017 3:00 PM 18-Jul-2017 A Approved Closed
Cluster 24, BC4
Cast in place concrete Form work inspection for RC ( First floor)
1207 KHEP-CI-1207 Cluster 02 A6 NA Division 03 13-Jul-2017 16-Jul-2017 3:00 PM 18-Jul-2017 E Rejected Closed
Cluster 2, A6
Cast in place concrete Form work inspection for RC ( First floor)
Approved w/
1207.1 KHEP-CI-1207-01 Cluster 02 A6 NA Division 03 23-Jul-2017 24-Jul-2017 10:00 AM 26-Jul-2017 B comments
Closed
Cluster 2, A6
Inspection of excavated and Compaction formation for Storm
Manholes Storm Maine line
1208 KHEP-CI-1208 Zone 1B, Line 7 & 8, MH(21-L08) to MH(26-L08) and MH(26a-L08) Line 7 & 8 Zone 1B Division 31 13-Jul-2017 15-Jul-2017 3:00 PM 15-Jul-2017 E Rejected Closed
M.H Dia 1200 (Type 1) MH(27-L07) and MH(28-L07) M.H Dia 1500
(Type 1)
Inspection of excavated and Compaction formation for Storm
Manholes Storm Maine line
1208.1 KHEP-CI-1208-01 Zone 1B, Line 7 & 8, MH(21-L08) to MH(26-L08) and MH(26a-L08) Line 7 & 8 Zone 1B Division 31 16-Jul-2017 17-Jul-2017 10:00 AM 18-Jul-2017 A Approved Closed
M.H Dia 1200 (Type 1) MH(27-L07) and MH(28-L07) M.H Dia 1500
(Type 1)
Inspection of Sand filling around the Pipe Storm Maine line

1209 KHEP-CI-1209 Zone 4B, Line 27, MH(114-L27) to MH(111a-L27) and MH(111a- Line 27 Zone 4B Division 31 13-Jul-2017 15-Jul-2017 10:30 AM 15-Jul-2017 E Rejected Closed
L27) to MH(111-L27) and MH(111-L27) to MH(110a-L27) and
MH(110a-L27) to MH(108-L27)
Inspection of Sand filling around the Pipe Storm Maine line ( Along
Road 2)
Approved w/
1209.1 KHEP-CI-1209-01 Zone 4B, Line 27, MH-114-L27 to MH-111a-L27 and MH-111a-L27 Line 27 Zone 4B Division 31 17-Jul-2017 18-Jul-2017 10:30 AM 19-Jul-2017 B comments
Closed
to MH-111-L27 800mm and MH-111-L27 to MH-110a-L27 and MH-
110a-L27- to MH-108-L27 800mm

Compaction test of Sand Filling Above the pipe trench and laying
warning tape Swear Maine Line Zone 4B, Approved w/
1210 KHEP-CI-1210
Line 2, MH-22-L02 to MH-21-L02 and MH-21-L02 to MH-20-L02 and
Line 2 Zone 4B Division 31 13-Jul-2017 15-Jul-2017 11:00 AM 16-Jul-2017 B comments
Closed
MH-20-L02 to MH-19-L02 and MH-19-L02 to MH-18-L02

Compaction test 1st layer general fill


Approved w/
1211 KHEP-CI-1211 Alley 16, (sta,0+000 to 0+075) (Excluding Alley 8 & 9 intersection) Alley 16,17 NA Division 31 13-Jul-2017 15-Jul-2017 11:00 AM 17-Jul-2017 B comments
Closed
and Alley 17, (sta,0+000 to 0+075)
Concrete sampling, testing and placement inspection for RC (First
1212 KHEP-CI-1212 Floor Slab) Cluster 01 A6 NA Division 03 13-Jul-2017 15-Jul-2017 9:00 AM 16-Jul-2017 A Approved Closed
Cluster 1, A6

Installation of reinforcing steel bar embedded item and form closure Approved w/
1213 KHEP-CI-1213
inspection for RC Column (First Floor) Cluster 1, A6
Cluster 01 A6 NA Division 03 13-Jul-2017 15-Jul-2017 3:00 PM 17-Jul-2017 B comments
Closed

Second Coat, Damp Proofing Installation Inspection for RC Footing


1214 KHEP-CI-1214 & Column neck Cluster 48, B2 NA Division 07 15-Jul-2017 16-Jul-2017 10:00 AM 17-Jul-2017 A Approved Closed
Cluster 48, B2
Second Coat, Damp Proofing Installation Inspection for RC Footing
Cluster 35,
1215 KHEP-CI-1215 & Column neck
B2
NA Division 07 15-Jul-2017 16-Jul-2017 10:00 AM 17-Jul-2017 A Approved Closed
Cluster 35, B2
Compaction test excavated formation Level bottom of Foundation
Cluster 50,
1216 KHEP-CI-1216
BC4
Zone 3B Division 31 15-Jul-2017 16-Jul-2017 11:00 AM 17-Jul-2017 A Approved Closed
Zone 3B, Cluster 50, BC4
Compaction test excavated formation Level bottom of Foundation
Cluster 18
1217 KHEP-CI-1217
BC4
Zone 1B Division 31 15-Jul-2017 16-Jul-2017 11:00 AM 17-Jul-2017 A Approved Closed
Zone 1B, Cluster 18, BC4

Compaction test of Sand Filling Above the pipe trench and laying
warning tape Swear Maine Line Zone 2B,
1218 KHEP-CI-1218 Line 9 & 10, MH-3-L09 to MH-2-L09 and MH-2-L09 to MH-1-L09 and Line 9 & 10 Zone 2B Division 31 15-Jul-2017 16-Jul-2017 10:30 AM 17-Jul-2017 A Approved Closed
MH-1-L09 to MH-1a-L09 and MH-1a-L09 to MH-9-L01 and MH-1-L10
to MH-1a-L10 and MH-1a-L10 to MH-1-L09

Compaction test of Sand Bedding Under Pipe Trench - Sewer Maine


1219 KHEP-CI-1219 Line Line 17 Zone 4B Division 31 15-Jul-2017 16-Jul-2017 11:15 AM 17-Jul-2017 A Approved Closed
Zone 4B, Line 17, MH-1-L17 to MH-17-L01
Compaction test of Sand Bedding Under Pipe Trench - Storm Maine
Line
1220 KHEP-CI-1220
Zone 4B, Line 22, MH-91-L22 to MH91a-L22 and MH-91a-L22 to
Line 22 Zone 4B Division 31 15-Jul-2017 16-Jul-2017 11:00 AM 17-Jul-2017 A Approved Closed
MH92-L21

Compaction test 8th layer general fill


1221 KHEP-CI-1221
Road 3, (sta,0+400 to 0+425) (Excluding Road 2 intersection)
Road 3 NA Division 31 15-Jul-2017 16-Jul-2017 11:30 AM 17-Jul-2017 E Rejected Closed

Compaction test 5th layer general fill


1222 KHEP-CI-1222
Alley 11, (sta,0+075 to 0+075) (Excluding Alley 2 intersection)
Alley 11 NA Division 31 15-Jul-2017 16-Jul-2017 3:00 PM 17-Jul-2017 A Approved Closed

Compaction test of Sand Bedding Under Pipe Trench - Sewer Maine


Line
1223 KHEP-CI-1223 Zone 2B, Line 27, MH-5-L27 to MH-4-L27 and MH-4-L27 to MH-3-L27 Line 27 NA Division 31 15-Jul-2017 16-Jul-2017 10:00 AM 17-Jul-2017 A Approved Closed
and MH-3-L27 to MH-2-L27 and MH-2-L27 to MH-1-L27 and MH-1-
L27 to MH-13-L02
Compaction test of Sand Bedding Under Pipe Trench - Sewer Maine
Line
1224 KHEP-CI-1224
Zone 2B, Line 28, MH-1-L28 to MH-1a-L28 and MH-1a-L28 to MH-2-
Line 28 NA Division 31 15-Jul-2017 16-Jul-2017 10:00 AM 17-Jul-2017 A Approved Closed
L27
Inspection PVC Water Stop Sample Sample
1225 KHEP-CI-1225
Sample Attached Attached
NA Division 33 15-Jul-2017 16-Jul-2017 9:00 AM 16-Jul-2017 E Rejected Closed
Concrete sampling, testing and placement inspection for RC Column
1226 KHEP-CI-1226 Ground Floor Cluster 68, B2 NA Division 03 15-Jul-2017 16-Jul-2017 9:00 AM 17-Jul-2017 A Approved Closed
Cluster 68, B2
Concrete sampling, testing and placement inspection for RC Column
1227 KHEP-CI-1227 Ground Floor Cluster 14 B2 NA Division 03 15-Jul-2017 16-Jul-2017 9:00 AM 17-Jul-2017 A Approved Closed
Cluster 14, B2
Installation of reinforcing steel bar embedded item and form closure
inspection for RC Stair Ground Floor - First floor Approved w/
1228 KHEP-CI-1228
Cluster 15,
Cluster 15 B2 NA Division 03 15-Jul-2017 16-Jul-2017 10:30 AM 18-Jul-2017 B comments
Closed
B2
First Coat, Damp Proofing Installation Inspection for RC Footing &
Cluster 61,
1229 KHEP-CI-1229 Column neck
B2
NA Division 07 16-Jul-2017 17-Jul-2017 3:00 PM 18-Jul-2017 A Approved Closed
Cluster 61, B2
Concrete sampling, testing and placement inspection for RC Footing
Cluster 29,
1230 KHEP-CI-1230
BC4
NA Division 03 16-Jul-2017 17-Jul-2017 9:00 AM 17-Jul-2017 A Approved Closed
Cluster 29, BC4
Compaction test of Sand Filling Above the pipe trench and laying
warning tape Storm Maine Line Zone 2B,
Approved w/
1231 KHEP-CI-1231 Line 8 & 7, MH-21-L08 to MH-26-L08 ,400mm and MH-26-L08 to Line 8 & 7 Zone 2B Division 31 16-Jul-2017 17-Jul-2017 3:30 PM 18-Jul-2017 B comments
Closed
MH-26a-L08, 500mm and MH-26a-L08 to MH-27-L07 and MH-27-
L07 to MH-28-L07, 500mm & 700mm
Inspection of excavated and Compaction formation for Pipe trench
Sewer Maine line Zone 2B,
1232 KHEP-CI-1232
Line 2, MH-14-L02 to MH-13-L02 and MH-13-L02 to MH12-L02 and
Line 2 Zone 2B Division 31 16-Jul-2017 17-Jul-2017 3:00 PM 17-Jul-2017 E Rejected Closed
MH-12-L02 to MH-11-L02
Inspection of excavated and Compaction formation for Pipe trench
Sewer Maine line Zone 2B,
1232.1 KHEP-CI-1232-01 Line 2, MH-14-L02 to MH-13-L02 and MH-13-L02 to MH12-L02 and Line 2 Zone 2B Division 31 20-Jul-2017 22-Jul-2017 3:00 PM 24-Jul-2017 A Approved Closed
MH-12-L02 to MH-11-L02 and MH-11-L02 to MH10-L02 and MH-10-
L02 to MH-09-L02
Compaction test of Sand Bedding Under Pipe Trench - Storm Maine
Line Dia 400mm
1233 KHEP-CI-1233
Zone 4B, Line 30, MH-106-L30 to MH107-L30 and MH-107-L30
Line 30 Zone 4B Division 31 16-Jul-2017 17-Jul-2017 10:00 AM 18-Jul-2017 E Rejected Closed
to MH107a-L30 and MH-107a-L30 to MH108-L27
Compaction test of Sand Bedding Under Pipe Trench - Storm Maine
Line Dia 400mm
1233.1 KHEP-CI-1233-01
Zone 4B, Line 30, MH-107-L30 to MH107-L30 and MH-107-L30
Line 30 Zone 4B Division 31 18-Jul-2017 19-Jul-2017 10:00 AM 20-Jul-2017 A Approved Closed
to MH107a-L30 and MH-107a-L30 to MH108-L27
Inspection of Sand filling around the Pipe Storm Maine Line Dia
500mm
1234 KHEP-CI-1234
Zone 2B, Line 18, MH-62-L18 to MH-63-L18 and MH-63-L18 to MH-
Line 18 Zone 2B Division 31 16-Jul-2017 17-Jul-2017 10:00 AM 18-Jul-2017 A Approved Closed
64-L18 and MH-64-L18 to MH-74-L18
Sampling- Aggregate sub base materials Jobsite
1235 KHEP-CI-1235
Jobsite StockPile 10 StockPile 10
NA Division 31 17-Jul-2017 18-Jul-2017 10:30 AM 19-Jul-2017 E Rejected Closed

Sampling- General fill materials Jobsite Jobsite Approved w/


1235.1 KHEP-CI-1235-01
StockPile 10 StockPile 10
NA Division 31 23-Jul-2017 24-Jul-2017 10:30 AM 26-Jul-2017 B comments
Closed

Termite control surface preparation, installation and final inspection


1236 KHEP-CI-1236 for Grad Beam Cluster 17, Cluster 17 B2 NA Division 03 17-Jul-2017 18-Jul-2017 10:30 AM 18-Jul-2017 A Approved Closed
B2
Blinding concrete sampling, Testing & placement inspection for Grad
Approved w/
1237 KHEP-CI-1237 Beam Cluster 17, Cluster 17 B2 NA Division 03 17-Jul-2017 18-Jul-2017 11:00 AM 19-Jul-2017 B comments
Closed
B2
Damp Proofing surface Preparation for RC Foundation & Column
Cluster 9,
1238 KHEP-CI-1238 Neck
BC4
NA Division 07 17-Jul-2017 18-Jul-2017 3:00 PM 19-Jul-2017 E Rejected Closed
Cluster 9, BC4
Damp Proofing surface Preparation for RC Foundation & Column
Cluster 9,
1238.1 KHEP-CI-1238-01 Neck
BC4
NA Division 07 20-Jul-2017 22-Jul-2017 10:00 AM 24-Jul-2017 E Rejected Closed
Cluster 9, BC4
Damp Proofing surface Preparation for RC Foundation & Column
Cluster 9,
1238.1 KHEP-CI-1238-02 Neck
BC4
NA Division 07 25-Jul-2017 26-Jul-2017 10:00 AM 29-Jul-2017 A Approved Closed
Cluster 9, BC4
Concrete sampling, testing and placement inspection for RC Grad
1239 KHEP-CI-1239 Beam Cluster 12 B2 NA Division 03 17-Jul-2017 18-Jul-2017 9:00 AM 18-Jul-2017 A Approved Closed
Cluster 12, B2
Compaction test Around Footing general fill (Final layer) Zone
1240 KHEP-CI-1240
1A, Cluster 3
Cluster 3 Zone 1A Division 31 17-Jul-2017 18-Jul-2017 10:00 AM 19-Jul-2017 A Approved Closed

Compaction test Around Footing general fill (Final layer) Zone


1241 KHEP-CI-1241
1A, Cluster 4
Cluster 4 Zone 1A Division 31 17-Jul-2017 18-Jul-2017 10:00 AM 19-Jul-2017 A Approved Closed
Inspection of excavated and Compaction formation for Pipe trench
Sewer Maine line Zone 2B,
1242 KHEP-CI-1242
Line 1, MH-14-L01 to MH-13-L01 and MH-13-L01 to MH-12-L01 and
Line 1 Zone 2B Division 31 17-Jul-2017 18-Jul-2017 10:00 AM 19-Jul-2017 E Rejected Closed
MH-12-L01 to MH-11-L01
Inspection of excavated and Compaction formation for Pipe trench
Sewer Maine line Zone 2B,
1242.1 KHEP-CI-1242-01
Line 1, MH-14-L01 to MH-13-L01 and MH-13-L01 to MH-12-L01 and
Line 1 Zone 2B Division 31 20-Jul-2017 22-Jul-2017 10:00 AM 24-Jul-2017 A Approved Closed
MH-12-L01 to MH-11-L01
Inspection of Sand filling around the Pipe Sewer Maine Line Dia
200mm
1243 KHEP-CI-1243 Zone 2B, Line 2, MH-18-L02 to MH-17-L02 and MH-17-L02 to MH- Line 2 Zone 2B Division 31 17-Jul-2017 18-Jul-2017 10:30 AM 19-Jul-2017 E Rejected Closed
16-L02 and MH-16-L02 to MH-15-L02 and MH-15-L02 to MH-14-L02

Inspection of Sand filling around the Pipe Sewer Maine Line Dia
200mm
1243.1 KHEP-CI-1243-01 Zone 2B, Line 2, MH-18-L02 to MH-17-L02 and MH-17-L02 to MH- Line 2 Zone 2B Division 31 20-Jul-2017 22-Jul-2017 11:30 AM 24-Jul-2017 A Approved Closed
16-L02 and MH-16-L02 to MH-15-L02 and MH-15-L02 to MH-14-L02

Compaction test Around Footing general fill (Final layer) Zone


1244 KHEP-CI-1244
4A, Cluster 66
Cluster 66 Zone 4A Division 31 17-Jul-2017 18-Jul-2017 10:00 AM 19-Jul-2017 A Approved Closed

Compaction test Around Footing general fill (Final layer) Zone


1245 KHEP-CI-1245
1B, Cluster 17
Cluster 17 Zone 1B Division 31 17-Jul-2017 18-Jul-2017 10:30 AM 19-Jul-2017 A Approved Closed

Compaction test Around Footing general fill (Final layer) Zone


1246 KHEP-CI-1246
1B, Cluster 7
Cluster 7 Zone 1B Division 31 17-Jul-2017 18-Jul-2017 10:30 AM 19-Jul-2017 A Approved Closed

Compaction test Around Footing general fill (Final layer) Zone


1247 KHEP-CI-1247
1B, Cluster 8
Cluster 8 Zone 1B Division 31 17-Jul-2017 18-Jul-2017 10:30 AM 19-Jul-2017 A Approved Closed

Installation of reinforcing steel bar embedded item and form closure


1248 KHEP-CI-1248 inspection for RC Column (Ground Floor) Excluding Axis (B2, B3, D2, Cluster 12 B2 NA Division 03 17-Jul-2017 18-Jul-2017 10:30 AM 19-Jul-2017 A Approved Closed
D3, A6, E6) Cluster 12, B2

Inspection of excavated and Compaction formation for Pipe trench


Storm Maine line Zone 1B,
1249 KHEP-CI-1249
Line 11, MH-133-L11 to MH-134-L11 and MH-134-L11 to MH-37-L11
Line 11 Zone 1B Division 31 17-Jul-2017 18-Jul-2017 3:00 PM 19-Jul-2017 A Approved Closed

Cast in place concrete Form work inspection for RC Column (First


Floor) Axis (A1, A2, A3, A4, B1, B4, B5, C3, C4, C5, C6, D4, D5, E2,
1250 KHEP-CI-1250
E3, E4, F4, F5, G3, G4, G5, H4, H5,)
Cluster 01 A6 NA Division 03 18-Jul-2017 19-Jul-2017 3:00 PM 19-Jul-2017 A Approved Closed
Cluster 1, A6
First Coat, Damp Proofing Installation Inspection for Cmu, Mortar
and Masonry Inspection Under Exterior Reinforced Grad beam
1251 KHEP-CI-1251 Cluster 7, B2 NA Division 07 18-Jul-2017 19-Jul-2017 10:30 AM 20-Jul-2017 A Approved Closed
Cluster 7, B2
Concrete sampling, testing and placement inspection for RC Grad
1252 KHEP-CI-1252 Beam Cluster 11 B2 NA Division 03 18-Jul-2017 19-Jul-2017 9:00 AM 19-Jul-2017 A Approved Closed
Cluster 11, B2
Second Coat, Damp Proofing Installation Inspection for RC Footing
Cluster 61,
1253 KHEP-CI-1253 & Column neck
B2
NA Division 07 18-Jul-2017 19-Jul-2017 10:00 AM 20-Jul-2017 A Approved Closed
Cluster 61, B2
Compaction test excavated formation Level bottom of Foundation
Cluster 36,
1254 KHEP-CI-1254
BC4
Zone 2B Division 31 18-Jul-2017 19-Jul-2017 11:00 AM 20-Jul-2017 E Rejected Closed
Zone 2B, Cluster 36, BC4
Compaction test excavated formation Level bottom of Foundation
Cluster 36,
1254.1 KHEP-CI-1254-01
BC4
Zone 2B Division 31 20-Jul-2017 22-Jul-2017 11:00 AM 24-Jul-2017 A Approved Closed
Zone 2B, Cluster 36, BC4
Compaction test 1st and final layer Structural fill (Selected fill)
Cluster 18
1255 KHEP-CI-1255
BC4
Zone 1B Division 31 18-Jul-2017 19-Jul-2017 11:30 AM 20-Jul-2017 A Approved Closed
Zone 1B, Cluster 18, BC4
Compaction test 1st and final layer Structural fill (Selected fill)
Cluster 50,
1256 KHEP-CI-1256
BC4
Zone 3B Division 31 18-Jul-2017 19-Jul-2017 3:00 PM 20-Jul-2017 A Approved Closed
Zone 3B, Cluster 50, BC4
Back filling General Fill 1st Layer for pipe trench - Sewer Maine line
Dia 200mm
Approved w/
1257 KHEP-CI-1257 Zone 2B, Line 9, MH-3-L09 to MH-2-L09 and MH-2-L09 Line 9 Zone 2B Division 31 18-Jul-2017 19-Jul-2017 11:00 AM 20-Jul-2017 B comments
Closed
to MH-1a-L09 and MH-1a-L09 to MH-9-L01 and MH-1-L10 to MH-1a-
L10 and MH-1a-L10 to MH-1-L09
Inspection of Sand filling around the Pipe Storm Maine Line Dia
400mm Approved w/
1258 KHEP-CI-1258
Zone 2B, Line 1, MH-3-L01 to MH-6-L01 and MH-6-L01 to
Line 1 Zone 2B Division 31 18-Jul-2017 19-Jul-2017 10:30 AM 20-Jul-2017 B comments
Closed
MH-132-L35
Installation of reinforcing steel bar embedded item and form closure
1259 KHEP-CI-1259 inspection for RC Grade Beam Cluster 5, Cluster 5, B2 NA Division 03 18-Jul-2017 19-Jul-2017 10:30 AM 20-Jul-2017 A Approved Closed
B2
Termite control surface preparation, installation and final inspection
1260 KHEP-CI-1260 for Grad Beam Cluster 3, Cluster 3, A6 NA Division 03 18-Jul-2017 19-Jul-2017 3:00 PM 20-Jul-2017 A Approved Closed
A6

Blinding concrete sampling, Testing & placement inspection for Grad


1261 KHEP-CI-1261
Beam Cluster 3, A6
Cluster 3, A6 NA Division 03 18-Jul-2017 19-Jul-2017 3:00 PM 20-Jul-2017 A Approved Closed

Inspection of Sand filling around the Pipe Storm Maine Line Dia
500mm Approved w/
1262 KHEP-CI-1262
Zone 4B, Line 22, MH-89-L22 to MH-90-L22 and MH-90-L22 to MH-
Line 22 Zone 4B Division 31 18-Jul-2017 19-Jul-2017 10:30 AM 19-Jul-2017 B comments
Closed
91-L22
Compaction test of Sand Filling Above the pipe trench and laying
warning tape Storm Maine Line Dia 500mm & 600mm
Approved w/
1263 KHEP-CI-1263 Zone 4B, Line 18 Zone 4B Division 31 18-Jul-2017 19-Jul-2017 3:00 PM 20-Jul-2017 B comments
Closed
Line 18, MH-62-L18 to MH-63-L18 and MH-63-L18 to MH-64-L18 and
MH-64-L18 to MH-74-L18
Compaction test Formation Level (NGL) Bottom of Foundation
Cluster 41,
1264 KHEP-CI-1264
BC4
Zone 2B Division 31 18-Jul-2017 19-Jul-2017 3:00 PM 20-Jul-2017 E Rejected Closed
Zone 2B, Cluster
Compaction 41, BC4 Level (NGL) Bottom of Foundation
test Formation
Cluster 41,
1264.1 KHEP-CI-1264-01
BC4
Zone 2B Division 31 6-Aug-2017 7-Aug-2017 10:00 AM 8-Aug-2017 A Approved Closed
Zone 2B, Cluster
Compaction 41, BC4 Level (NGL) Bottom of Foundation
test Formation
Cluster 42,
1265 KHEP-CI-1265
BC4
Zone 2B Division 31 18-Jul-2017 19-Jul-2017 3:00 PM 20-Jul-2017 E Rejected Closed
Zone 2B, Cluster
Compaction 42, BC4 Level (NGL) Bottom of Foundation
test Formation
Cluster 42,
1265.1 KHEP-CI-1265-01
BC4
Zone 2B Division 31 6-Aug-2017 7-Aug-2017 3:00 PM 8-Aug-2017 A Approved Closed
Zone 2B, Cluster 42, BC4
Blinding concrete sampling, Testing & placement inspection for
Manhole Storm Maine Line Zone 1B, Line 7
1266 KHEP-CI-1266
& 8, MH-21-L08 to MH-26-L08 and MH-26a-L08 M.H Dia 1200 (Type
Line 7 & 8 Zone 1B Division 03 18-Jul-2017 19-Jul-2017 3:00 PM 20-Jul-2017 A Approved Closed
1) MH-27-L07 and MH-28-L07 M.H Dia 1500 (Type 1)

Inspection of excavated and Compaction formation for Pipe trench


1267 KHEP-CI-1267 Storm Maine line Zone 1B, Line 16 Zone 1B Division 31 19-Jul-2017 20-Jul-2017 11:00 AM 20-Jul-2017 E Rejected Closed
Line 16, MH-153-L16 to MH-54-L16
Inspection of excavated and Compaction formation for Pipe trench
1267.1 KHEP-CI-1267-01 Storm Maine line 400mm Line 16 Zone 1B Division 31 22-Jul-2017 23-Jul-2017 12:00 PM 25-Jul-2017 A Approved Closed
Zone 1B, Line 16, MH-153-L16 to MH-54-L16
Compaction test of Sand Bedding Under Pipe Trench - Storm Maine
Line Dia 400mm
1268 KHEP-CI-1268
Zone 1B, Line 11, MH-133-L11 to MH134-L11 and MH-134-L11
Line 11 Zone 1B Division 31 19-Jul-2017 20-Jul-2017 10:00 AM 22-Jul-2017 A Approved Closed
to MH-37-L11
Inspection of Sand filling around the Pipe Storm Maine Line Dia
Approved w/
1269 KHEP-CI-1269 400mm Line 10 Zone 4B Division 31 19-Jul-2017 20-Jul-2017 10:30 AM 20-Jul-2017 B comments
Closed
Zone 4B, Line 10, MH-131-L10 to MH-32-L10
Installation of reinforcing steel bar embedded item and form closure
inspection for RC Column (First floor) axis (B2, B3, C2, D2, D3, F2,
1270 KHEP-CI-1270
F3, G2, H2, H3, K2, K3, L2, M2, M3)
Cluster 01 A6 NA Division 03 19-Jul-2017 20-Jul-2017 10:00 AM 20-Jul-2017 A Approved Closed
Cluster 1, A6
Cast in place concrete Form work inspection for RC Column (First
Floor) Axis (E1, G2, G6, H1, K1, L4, L5, M1, M2, M3, M4, N2, N3) Approved w/
1271 KHEP-CI-1271 Cluster 01 A6 NA Division 03 19-Jul-2017 20-Jul-2017 3:00 PM 23-Jul-2017 B comments
Closed
Cluster 1, A6
Installation of reinforcing steel bar embedded item and form closure
inspection for RC Column (Ground floor) axis (B2, B3, D2, D3,A6,
1272 KHEP-CI-1272
E6)
Cluster 11 B2 NA Division 03 19-Jul-2017 20-Jul-2017 3:00 PM 22-Jul-2017 A Approved Closed
Cluster 11, B2
Back filling General Fill 1st Layer for pipe trench - Storm Maine line
Dia 400mm & 500mm & 700mm
1273 KHEP-CI-1273 Zone 4B, Line 8 & 7, MH-21-L08 to Line 8 & 7 Zone 4B Division 31 19-Jul-2017 20-Jul-2017 11:30 AM 22-Jul-2017 A Approved Closed
MH-26-L08 and MH-26-L08 to MH-26a-L08 and MH-26a-L08 to MH-
27-L07 and MH-27-L07 to MH-28-L07
Inspection of excavated and Compaction formation for Pipe trench
Storm Maine line Zone 1B, Line 11 & 16
1274 KHEP-CI-1274
Line 11 & 16 & 10, MH-153-L16 to MH-134-L11 M.H Dia 1500 MH- & 10
Zone 1B Division 31 19-Jul-2017 20-Jul-2017 10:00 AM 22-Jul-2017 E Rejected Closed
133-L11 to MH-131-L10 M.H Dia 1500
Inspection of excavated and Compaction formation for Storm inlet
Manholes Storm Maine line Line 11 & 16
1274.1 KHEP-CI-1274-01
Zone 1B, Line 11 & 16 & 10, MH-I53-L16 to MH-I34-L11 M.H Dia & 10
Zone 1B Division 31 27-Jul-2017 29-Jul-2017 10:00 AM 1-Aug-2017 A Approved Closed
1500 MH-I33-L11 to MH-I31-L10 M.H Dia 1500
Concrete sampling, testing and placement inspection for RC Column
Cluster 24,
1275 KHEP-CI-1275 neck
BC4
NA Division 03 19-Jul-2017 20-Jul-2017 9:00 AM 20-Jul-2017 A Approved Closed
Cluster 24, BC4
Concrete sampling, testing and placement inspection for RC Up
1276 KHEP-CI-1276 Stand Cluster 69, B2 NA Division 03 19-Jul-2017 20-Jul-2017 9:00 AM 22-Jul-2017 A Approved Closed
Cluster 69, B2
Concrete sampling, testing and placement inspection for RC Stair
1277 KHEP-CI-1277 (Ground floor) First flight Cluster 15 B2 NA Division 03 19-Jul-2017 20-Jul-2017 9:00 AM 20-Jul-2017 A Approved Closed
Cluster 15, B2
Second Coat, Damp Proofing Installation Inspection for Cmu, Mortar
and Masonry Inspection Under Exterior Reinforced Grad beam
1278 KHEP-CI-1278 Cluster 7, B2 NA Division 07 20-Jul-2017 22-Jul-2017 10:30 AM 24-Jul-2017 E Rejected Closed
Cluster 7, B2
Second Coat, Damp Proofing Installation Inspection for Cmu, Mortar
and Masonry Inspection Under Exterior Reinforced Grad beam
1278.1 KHEP-CI-1278-01 Cluster 7, B2 NA Division 07 25-Jul-2017 26-Jul-2017 10:30 AM 29-Jul-2017 A Approved Closed
Cluster 7, B2
Cast in place concrete Form work inspection for RC Column (Ground
1279 KHEP-CI-1279 Floor) Excluding Axis (B2, B3, D2, D3,A6, E6) Cluster 12 B2 NA Division 03 20-Jul-2017 22-Jul-2017 11:00 AM 23-Jul-2017 A Approved Closed
Cluster 12, B2
Installation of reinforcing steel bar embedded item and form closure
inspection for RC Column (Ground floor) axis (B2, B3, D2, D3,A6,
1280 KHEP-CI-1280
E6)
Cluster 12 B2 NA Division 03 20-Jul-2017 22-Jul-2017 10:30 AM 23-Jul-2017 A Approved Closed
Cluster 12, B2
Cast in place concrete Form work inspection for RC Column (First
Floor) Axis (B2, B3,C2,D2,D3,
1281 KHEP-CI-1281 D1,F1,F2,F3,H2,H3,J1,J3,J4,K2K3,K4,K5,L2,L3,M5 ) Cluster 01 A6 NA Division 03 20-Jul-2017 22-Jul-2017 11:00 AM 30-Jul-2017 A Approved Closed
Cluster 1,
A6
Compaction test of Sand Filling Above the pipe trench and laying
warning tape Storm Maine Line Dia 400mm Approved w/
1282 KHEP-CI-1282
Zone 2B, Line 1,
Line 1 Zone 2B Division 31 20-Jul-2017 22-Jul-2017 11:00 AM 24-Jul-2017 B comments
Closed
MH-3-L01 to MH-6-L01 and MH-6-L01 to MH-132-L35
Inspection of Sand filling around the Pipe Storm Maine Line Dia
600mm Approved w/
1283 KHEP-CI-1283
Zone 2B, Line 22, MH-91-L22 to MH-91a-L22 and MH-91a-L22 to
Line 22 Zone 2B Division 31 20-Jul-2017 22-Jul-2017 11:30 AM 24-Jul-2017 B comments
Closed
MH-92-L21
Inspection of Sand filling around the Pipe Sewer Maine Line Dia
1284 KHEP-CI-1284 200mm Line 17 Zone 2B Division 31 20-Jul-2017 22-Jul-2017 11:00 AM 26-Jul-2017 E Rejected Closed
Zone 2B, Line 17, MH-1-L17 to MH-17-L01
Inspection of Sand filling around the Pipe Sewer Maine Line Dia
1284.1 KHEP-CI-1284-01 200mm Line 17 Zone 2B Division 31 29-Jul-2017 30-Jul-2017 11:00 AM 31-Jul-2017 A Approved Closed
Zone 2B, Line 17, MH-1-L17 to MH-17-L01
Cast in place concrete Form work inspection for RC Grad Beam
Approved w/
1285 KHEP-CI-1285 Cluster 10 B2 NA Division 03 20-Jul-2017 22-Jul-2017 11:00 AM 25-Jul-2017 B comments
Closed
Cluster 10, B2
Cast in place concrete Form work inspection for RC Footing
Cluster 28,
1286 KHEP-CI-1286
BC4
NA Division 03 22-Jul-2017 23-Jul-2017 10:00 AM 24-Jul-2017 A Approved Closed
Cluster 28, BC4
Installation of reinforcing steel bar embedded item and form closure
Cluster 28,
1287 KHEP-CI-1287 inspection for RC Footing
BC4
NA Division 03 22-Jul-2017 23-Jul-2017 10:00 AM 24-Jul-2017 A Approved Closed
Cluster 28, BC4
Termite control surface preparation, installation and final inspection
Cluster 18 Approved w/
1288 KHEP-CI-1288 for Footing Cluster 18,
BC4
NA Division 03 22-Jul-2017 23-Jul-2017 10:00 AM 25-Jul-2017 B comments
Closed
BC4
Blinding concrete sampling, Testing & placement inspection for
Cluster 18 Approved w/
1289 KHEP-CI-1289 Footing Cluster
BC4
NA Division 03 22-Jul-2017 23-Jul-2017 10:00 AM 26-Jul-2017 B comments
Closed
18, BC4
Installation of reinforcing steel bar embedded item and form closure
inspection for RC Column axis (B2, B3, D2, D3,A6, E6) Approved w/
1290 KHEP-CI-1290 Cluster 11 B2 NA Division 03 22-Jul-2017 23-Jul-2017 10:00 AM 24-Jul-2017 B comments
Closed
Cluster 11, B2
First Coat, Damp Proofing Installation Inspection for RC Footing &
Cluster 9,
1291 KHEP-CI-1291 Column neck
BC4
NA Division 03 22-Jul-2017 23-Jul-2017 9:30 AM 25-Jul-2017 E Rejected Closed
Cluster 9, BC4
First Coat, Damp Proofing Installation Inspection for RC Footing &
Cluster 9,
1291.1 KHEP-CI-1291-01 Column neck
BC4
NA Division 07 26-Jul-2017 27-Jul-2017 9:30 AM 27-Jul-2017 A Approved Closed
Cluster 9, BC4
Cast in place concrete Form work inspection for RC Column (Ground
Floor) Excluding Axis (B2, B3, D2, D3,A6, E6, A3, E3) Approved w/
1292 KHEP-CI-1292
Cluster
Cluster 11 B2 NA Division 03 22-Jul-2017 23-Jul-2017 3:00 PM 24-Jul-2017 B comments
Closed
11, B2
Compaction test excavated formation Level bottom of Foundation
Cluster 77,
1293 KHEP-CI-1293
BC4
Zone 4B Division 31 22-Jul-2017 23-Jul-2017 11:00 AM 25-Jul-2017 A Approved Closed
Zone 4B, Cluster 77, BC4

Inspection of Sand filling around the Pipe Sewer Maine Line Dia
200mm
1294 KHEP-CI-1294 Zone 2B, Line 29 & 30, MH-3-L30 to MH-2-L30 and MH-2-L30 to MH- Line 29 & 30 Zone 2B Division 31 22-Jul-2017 23-Jul-2017 11:30 AM 24-Jul-2017 A Approved Closed
1-L30 and MH-1-L30 to MH-1a-L30 and MH-1a-L30 to MH-11-L02
and MH-1-L29 to MH-1a-L29 and MH-1a-L29 to MH-1-L30

Inspection of Sand filling around the Pipe Sewer Maine Line Dia
400mm
1295 KHEP-CI-1295
Zone 2B, Line 30, MH-106-L30 to MH-107-L03 and MH-107-L30 to
Line 30 Zone 2B Division 31 22-Jul-2017 23-Jul-2017 3:00 PM 24-Jul-2017 A Approved Closed
MH-107a-L30 and MH-107a-L30 to MH-108-L27
Compaction test of Sand Bedding Under Pipe Trench - Storm Maine
Line Dia 200mm
1296 KHEP-CI-1296
Zone 2B, Line 1, MH-14-L01 to MH13-L01 and MH-13-L01 to
Line 1 Zone 2B Division 31 22-Jul-2017 23-Jul-2017 10:30 AM 24-Jul-2017 A Approved Closed
MH-12-L01 and MH-12-L01 to MH-11-L01
Compaction test of Sand Filling Above the pipe trench and laying
warning tape Storm Maine Line Dia 500mm
1297 KHEP-CI-1297
Zone 2B, Line 22,
Line 22 Zone 2B Division 31 22-Jul-2017 23-Jul-2017 11:00 AM 25-Jul-2017 A Approved Closed
MH-89-L22 to MH-90-L22 and MH-90-L22 to MH-91-L22
Cast in place concrete Form work inspection for RC Column (First
Approved w/
1298 KHEP-CI-1298 Floor) Axis (J2, L6, N1, N4) Cluster 01 A6 NA Division 03 22-Jul-2017 23-Jul-2017 3:00 PM 24-Jul-2017 B comments
Closed
Cluster 1, A6
Compaction test of Sand Bedding Under Pipe Trench - Sewer Maine
Line Dia 200mm
1299 KHEP-CI-1299 Zone 2B, Line 2, MH-14-L02 to MH-13-L02 and MH-13-L02 to Line 2 Zone 2B Division 31 22-Jul-2017 23-Jul-2017 3:00 PM 25-Jul-2017 A Approved Closed
MH-12-L02 and MH-12-L02 to MH-11-L02 and MH-11-L02 to MH-10-
L02 and MH-10-L02 to MH-9-L02
40cm, CMU, Mortar and Masonry Inspection Under Exterior
1300 KHEP-CI-1300 Reinforced Grad beam Cluster 71, B2 NA Division 04 23-Jul-2017 24-Jul-2017 10:30 AM 26-Jul-2017 A Approved Closed
Cluster 71, B2
Cast in place concrete Form work inspection for RC Column (Ground
1301 KHEP-CI-1301 Floor) Axis (B2,B3,D2,D3,A6,E6) Cluster 12 B2 NA Division 03 23-Jul-2017 24-Jul-2017 3:00 PM 26-Jul-2017 A Approved Closed
Cluster 12, B2
Termite control surface preparation, installation and final inspection
Cluster 60,
1302 KHEP-CI-1302 for Footing Cluster 60,
BC4
NA Division 03 23-Jul-2017 24-Jul-2017 10:00 AM 26-Jul-2017 A Approved Closed
BC4
Blinding concrete sampling, Testing & placement inspection for
Cluster 60,
1303 KHEP-CI-1303 Footing Cluster
BC4
NA Division 03 23-Jul-2017 24-Jul-2017 10:00 AM 27-Jul-2017 A Approved Closed
60, BC4
Sampling fine sand for mortar
1304 KHEP-CI-1304
Site work
Site work NA Division 03 23-Jul-2017 24-Jul-2017 10:00 AM 25-Jul-2017 E Rejected Closed

Inspection of excavated and Compaction formation for Pipe trench


1305 KHEP-CI-1305 Storm Maine line Zone 1B, Line 13 Zone 1B Division 31 23-Jul-2017 24-Jul-2017 11:00 AM 25-Jul-2017 A Approved Closed
Line 13, MH-139-L13 to MH-140-L13 MH-140-L13 to MH-141-L13

Inspection of Sand filling around the Pipe Storm Maine Line Dia
400mm
1306 KHEP-CI-1306
Zone 1B, Line 11, MH-133-L11 to MH-134-L11 and MH-134-L11 to
Line 11 Zone 1B Division 31 23-Jul-2017 24-Jul-2017 3:00 PM 26-Jul-2017 A Approved Closed
MH-37-L11
Cast in place concrete Form work inspection for RC Stair (Ground
Approved w/
1307 KHEP-CI-1307 Floor)First flight Cluster 13 B2 NA Division 03 23-Jul-2017 24-Jul-2017 10:00 AM 25-Jul-2017 B comments
Closed
Cluster 13, B2
Cast in place concrete Form work inspection for RC Stair (Ground
Approved w/
1308 KHEP-CI-1308 Floor)First flight Cluster 68, B2 NA Division 03 23-Jul-2017 24-Jul-2017 10:00 AM 25-Jul-2017 B comments
Closed
Cluster 68, B2
Cast in place concrete Form work inspection for RC Up stand (First
1309 KHEP-CI-1309 Floor slab) Cluster 01 A6 NA Division 03 24-Jul-2017 26-Jul-2017 10:00 AM 26-Jul-2017 A Approved Closed
Cluster 1, A6
Cast in place concrete Form work inspection for RC Stair (Ground
1310 KHEP-CI-1310 Floor)First flight Cluster 14 B2 NA Division 03 24-Jul-2017 25-Jul-2017 10:00 AM 26-Jul-2017 E Rejected Closed
Cluster 14, B2
Cast in place concrete Form work inspection for RC Stair (Ground
1310.1 KHEP-CI-1310-01 Floor)First flight Cluster 14 B2 NA Division 03 27-Jul-2017 29-Jul-2017 10:00 AM 30-Jul-2017 E Rejected Closed
Cluster 14, B2
Cast in place concrete Form work inspection for RC Stair (Ground
1310.2 KHEP-CI-1310-02 Floor)First flight Cluster 14 B2 NA Division 03 31-Jul-2017 1-Aug-2017 10:00 AM 3-Aug-2017 A Approved Closed
Cluster 14, B2
Cast in place concrete Form work inspection for RC Column (Ground
1311 KHEP-CI-1311 Floor) Axis (B2,B3,D2,D3,A6,E6,A3,E3) Cluster 11 B2 NA Division 03 24-Jul-2017 25-Jul-2017 3:00 PM 26-Jul-2017 E Rejected Closed
Cluster 11, B2
Cast in place concrete Form work inspection for RC Column (Ground
1311.1 KHEP-CI-1311-01 Floor) Axis Excluding (C2,C5,BC5,E5,B6,C6,D6) Cluster 11 B2 NA Division 03 27-Jul-2017 29-Jul-2017 10:30 AM 30-Jul-2017 A Approved Closed
Cluster 11, B2
First Coat, Damp Proofing Installation Inspection for Cmu, Mortar
and Masonry Inspection Under Exterior Reinforced Grad beam Cluster 44,
1312 KHEP-CI-1312
A6
NA Division 07 24-Jul-2017 25-Jul-2017 3:00 PM 26-Jul-2017 E Rejected Closed
Cluster 44, A6
First Coat, Damp Proofing Installation Inspection for CMU, Mortar
and Masonry Inspection Under Exterior Reinforced Grad beam Cluster 44,
1312.1 KHEP-CI-1312-01
A6
NA Division 07 27-Jul-2017 29-Jul-2017 10:00 AM 30-Jul-2017 A Approved Closed
Cluster 44, A6
Inspection of excavated and Compaction formation for Pipe trench
Sewer Maine line Dia 200mm
1313 KHEP-CI-1313
Zone 1B, Line 1, MH-11-L01 to MH-10-L01 and MH-10-L01 to MH-09-
Line 1 Zone 1B Division 31 24-Jul-2017 25-Jul-2017 11:00 AM 26-Jul-2017 A Approved Closed
L01 and MH-09-L01 to MH-08-L01
Compaction test of Sand Filling Above the pipe trench and laying
warning tape Sewer Maine Line Dia 200mm
1314 KHEP-CI-1314 Zone 2B, Line 2, Line 2 Zone 2B Division 31 24-Jul-2017 25-Jul-2017 3:00 PM 27-Jul-2017 A Approved Closed
MH-18-L02 to MH-17-L02 and MH-17-L02 to MH-16-L02 and MH-16-
L02 to MH-15-L02 and MH-15-L02 to MH-14-L02
Compaction test of Sand Filling Above the pipe trench and laying
warning tape Storm Maine Line Dia 400mm
1315 KHEP-CI-1315 Zone 2B, Line 30, Line 30 Zone 2B Division 31 24-Jul-2017 25-Jul-2017 11:00 AM 27-Jul-2017 A Approved Closed
MH-106-L30 to MH-107-L30 and MH-107-L30 to MH-107a-L30 and
MH-107a-L30 to MH-108-L27
Compaction test 1st and final layer Structural fill (Selected fill)
Cluster
1316 KHEP-CI-1316
36,BC4
Zone 2B Division 31 24-Jul-2017 25-Jul-2017 11:30 AM 26-Jul-2017 A Approved Closed
Zone 2B, Cluster 36,BC4
Compaction test 1st and final layer Structural fill (Selected fill)
Cluster
1317 KHEP-CI-1317
77,BC4
Zone 4B Division 31 24-Jul-2017 25-Jul-2017 11:30 AM 26-Jul-2017 A Approved Closed
Zone 4B, Cluster 77,BC4
Cast in place concrete Form work inspection for RC (First Floor slab)
Approved w/
1318 KHEP-CI-1318 Cluster 15 B2 NA Division 03 24-Jul-2017 25-Jul-2017 10:00 AM 26-Jul-2017 B comments
Closed
Cluster 15, B2
Concrete sampling, testing and placement inspection for RC Column
1319 KHEP-CI-1319 (first floor slab) Cluster 01 A6 NA Division 03 25-Jul-2017 26-Jul-2017 9:00 AM 27-Jul-2017 A Approved Closed
Cluster 1, A6

Concrete sampling, testing and placement inspection for RC Footing Cluster 28,
1320 KHEP-CI-1320
Cluster 28, BC4 BC4
NA Division 03 25-Jul-2017 26-Jul-2017 9:00 AM 27-Jul-2017 A Approved Closed

Installation of reinforcing steel bar embedded item and form closure


inspection for RC Column (Ground floor) Excluding axis (B2, B3, D2,
1321 KHEP-CI-1321
D3,A6, E6,A3,E3)
Cluster 10 B2 NA Division 03 25-Jul-2017 26-Jul-2017 3:00 PM 27-Jul-2017 A Approved Closed
Cluster 10, B2
Cast in place concrete Form work inspection for RC Stair (Ground
1322 KHEP-CI-1322 Floor) Cluster 02 A6 NA Division 03 25-Jul-2017 26-Jul-2017 10:00 AM 27-Jul-2017 E Rejected Closed
Cluster 2, A6
Cast in place concrete Form work inspection for RC Stair (Ground
1322.1 KHEP-CI-1322-01 Floor) Cluster 02 A6 NA Division 03 31-Jul-2017 1-Aug-2017 10:00 AM 1-Aug-2017 E Rejected Closed
Cluster 2, A6
Inspection of excavated and Compaction formation for Pipe trench
Storm Maine line Dia 400mm
1323 KHEP-CI-1323
Zone 1B, Line 13, MH-141-L13 to MH-142-L13 and MH-142-L13 to
Line 13 Zone 1B Division 31 25-Jul-2017 26-Jul-2017 11:00 AM 27-Jul-2017 E Rejected Closed
MH-45-L13
Inspection of excavated and Compaction formation for Pipe trench
Storm Maine line Dia 400mm
1323.1 KHEP-CI-1323-01
Zone 1B, Line 13, MH-I41-L13 to MH-I42-L13 and MH-I42-L13 to
Line 13 Zone 1B Division 31 27-Jul-2017 29-Jul-2017 11:00 AM 30-Jul-2017 A Approved Closed
MH-45-L13
Compaction test of Sand Filling Above the pipe trench and laying
warning tape Sewer Maine Line Dia 200mm
Zone 2B, Line 30 &
1324 KHEP-CI-1324
29, MH-3-L30 to MH-2-L30 and MH-2-L30 to MH-1-L30 and MH-1-
Line 30 & 29 Zone 2B Division 31 25-Jul-2017 26-Jul-2017 11:00 AM 27-Jul-2017 A Approved Closed
L30 to MH-1a-L30 and MH-1a-L30 to MH-11-L02 and MH-1-L29 to
MH-1a-L29 and MH-1a-L29 to MH-1-L30
Compaction test of Sand Bedding Under Pipe Trench - Storm Maine
Line Dia 400mm
1325 KHEP-CI-1325
Zone 2B, Line 13, MH-139-L13 to MH-140-L13 and MH-140-L13
Line 13 Zone 2B Division 31 25-Jul-2017 26-Jul-2017 11:00 AM 27-Jul-2017 A Approved Closed
to MH-141-L13
Installation of reinforcement steel bar for storm manholes Storm
Approved w/
1326 KHEP-CI-1326 main line Zone 1B, Line Line 8 Zone 1B Division 31 25-Jul-2017 26-Jul-2017 10:00 AM 30-Jul-2017 B comments
Closed
8, MH-26a-L08 M.H. Dia 1200
Installation of reinforcing steel bar embedded item and form closure
Approved w/
1327 KHEP-CI-1327 inspection for RC (First floor slab) & Stair Cluster 02 A6 NA Division 03 25-Jul-2017 26-Jul-2017 10:00 AM 27-Jul-2017 B comments
Closed
Cluster 2, A6
Termite control surface preparation, installation and final inspection
1328 KHEP-CI-1328 for Grad beam Cluster 7, Cluster 7, B2 NA Division 03 25-Jul-2017 26-Jul-2017 3:00 PM 30-Jul-2017 A Approved Closed
B2
Blinding concrete sampling, Testing & placement inspection for Grad
1329 KHEP-CI-1329 beam Cluster 7, B2 Cluster 7, B2 NA Division 03 25-Jul-2017 26-Jul-2017 3:00 PM 30-Jul-2017 E Rejected Closed

Blinding concrete sampling, Testing & placement inspection for Grad


1329.1 KHEP-CI-1329-01 beam Cluster 7, B2 Cluster 7, B2 NA Division 03 31-Jul-2017 1-Aug-2017 3:00 PM 2-Aug-2017 A Approved Closed

Cast in place concrete Form work inspection for RC Grad Beam


1330 KHEP-CI-1330 Cluster 17, Cluster 17 B2 NA Division 03 25-Jul-2017 26-Jul-2017 10:00 AM 27-Jul-2017 A Approved Closed
B2
Installation of reinforcing steel bar embedded item and form closure
1331 KHEP-CI-1331 inspection for RC Grad beam Cluster 17 B2 NA Division 03 25-Jul-2017 26-Jul-2017 10:00 AM 27-Jul-2017 A Approved Closed
Cluster 17, B2
Compaction test of Sand Filling Above the pipe trench and laying
1332 KHEP-CI-1332 warning tape Storm Maine Line Dia 400mm Zone 1B, Line 10, MH- Line 10 Zone 1B Division 31 26-Jul-2017 27-Jul-2017 11:00 AM 29-Jul-2017 A Approved Closed
I31-L10 to MH-32-L10

Compaction test of Sand Filling Above the pipe trench and laying
1333 KHEP-CI-1333 warning tape Storm Maine Line Dia 400mm Zone 1B, Line 11, MH- Line 11 Zone 1B Division 31 26-Jul-2017 27-Jul-2017 11:30 AM 29-Jul-2017 A Approved Closed
I33-L11 to MH-I34-L11 and MH-I34-L11 to MH-37-L11

Compaction test of Sand bending under pipe trench sewer main line
Dia 200mm Zone 2B, Line 1,
1334 KHEP-CI-1334
MH-11-L01 to MH-10-L01 and MH-10-L01 to MH-9-L01 and MH-9-
Line 01 Zone 2B Division 31 26-Jul-2017 27-Jul-2017 11:30 AM 30-Jul-2017 A Approved Closed
L01 to MH-8-L01
Compaction test excavated formation level bottom of foundation
Cluster 26 ,
1335 KHEP-CI-1335 Zone
BC-4
Zone 2B Division 31 26-Jul-2017 27-Jul-2017 10:00 AM 29-Jul-2017 A Approved Closed
2B, Cluster 26, BC 4
Concrete sampling, testing and placement inspection for RC Grad
1336 KHEP-CI-1336 Beam Cluster Cluster 10 B2 NA Division 03 26-Jul-2017 27-Jul-2017 9:00 AM 29-Jul-2017 A Approved Closed
10, B2
Installation of reinforcing steel bar, Embedded item and form closure
1337 KHEP-CI-1337 inspection for RC stair (Ground Floor) first flight Cluster 13 B2 NA Division 03 26-Jul-2017 27-Jul-2017 10:00 AM 29-Jul-2017 A Approved Closed
Cluster 13, B2
Installation of reinforcing steel bar, Embedded item and form closure
inspection for RC stair (Ground Floor) first flight
1338 KHEP-CI-1338
Cluster 68,
Cluster 68, B2 NA Division 03 26-Jul-2017 27-Jul-2017 10:00 AM 29-Jul-2017 A Approved Closed
B2
Cast in place concrete formwork inspection for storm manholes-
Approved w/
1339 KHEP-CI-1339 storm main line Line 8 Zone 1B Division 04 26-Jul-2017 27-Jul-2017 10:00 AM 30-Jul-2017 B comments
Closed
Zone 1B, Line 8, MH-26a-L08, M.H Dia 1200

70 cm, CMU,morter and masonry inspection under exterior reinforced Cluster 16


1340 KHEP-CI-1340
Grad Beam Cluster 16, BC4 BC4
NA Division 04 27-Jul-2017 29-Jul-2017 3:00 PM 30-Jul-2017 A Approved Closed

Cast in place concrete formwork inspection for RC Grad beam


1341 KHEP-CI-1341
Cluster 5, B2
Cluster 5, B2 NA Division 03 27-Jul-2017 29-Jul-2017 3:00 PM 31-Jul-2017 E Rejected Closed

Cast in place concrete formwork inspection for RC Grad beam


1341.1 KHEP-CI-1341-01
Cluster 5, B2
Cluster 5, B2 NA Division 03 1-Aug-2017 2-Aug-2017 10:00 AM 2-Aug-2017 A Approved Closed

Compaction test excavated formation level bottom of foundation


Cluster 22,
1342 KHEP-CI-1342 Zone
BC 4
Zone 2B Division 31 27-Jul-2017 29-Jul-2017 10:00 AM 30-Jul-2017 A Approved Closed
2B, Cluster 22, BC 4
Compaction test excavated formation level bottom of foundation
Cluster 55,
1343 KHEP-CI-1343 Zone
BC
Zone 3B Division 31 27-Jul-2017 29-Jul-2017 11:30 AM 1-Aug-2017 A Approved Closed
3B, Cluster 55, BC 4
Compaction test of sand bedding under pipe trench - storm main
1344 KHEP-CI-1344 line Dia 400mm Zone 1B, Zone 1B Line 16 Division 31 27-Jul-2017 29-Jul-2017 11:30 AM 30-Jul-2017 A Approved Closed
Line 16, MH-I53-L16 to MH-54-L15

70 cm, CMU,morter and masonry inspection under exterior reinforced


1345 KHEP-CI-1345
Grad Beam Cluster 75, B2
Cluster 75, B2 NA Division 04 27-Jul-2017 29-Jul-2017 9:30 AM 30-Jul-2017 A Approved Closed

Termite control surface preparation, installation and final inspection


Cluster 76,
1346 KHEP-CI-1346 for Footing Cluster 76,
BC4
NA Division 04 27-Jul-2017 29-Jul-2017 3:00 PM 30-Jul-2017 A Approved Closed
BC4
Blinding concrete sampling, Testing & placement inspection for
Cluster 76,
1347 KHEP-CI-1347 Footing Cluster
BC4
NA Division 04 27-Jul-2017 29-Jul-2017 3:30 PM 1-Aug-2017 A Approved Closed
76, BC4
Concrete sampling , testing and placement inspection for RC grad
1348 KHEP-CI-1348 beam Cluster Cluster 17 B2 NA Division 03 29-Jul-2017 30-Jul-2017 9:00 AM 30-Jul-2017 A Approved Closed
17, B2
Concrete sampling , testing and placement inspection for RC first
1349 KHEP-CI-1349 floor slab Cluster 02 A6 NA Division 03 29-Jul-2017 30-Jul-2017 9:00 AM 30-Jul-2017 E Rejected Closed
Cluster 2, A6
Concrete sampling , testing and placement inspection for RC first
1349.1 KHEP-CI-1349-01 floor slab Cluster 02 A6 NA Division 03 6-Aug-2017 7-Aug-2017 9:00 AM 13-Aug-2017 E Rejected Closed
Cluster 2, A6
Concrete sampling , testing and placement inspection for RC first
1350.1 KHEP-CI-1349-02 floor slab Cluster 02 A6 NA Division 03 28-Aug-2017 29-Aug-2017 9:00 AM 30-Aug-2017 A Approved Closed
Cluster 2, A6
Concrete sampling , testing and placement inspection for RC stair
1350 KHEP-CI-1350 (Ground Floor) first flight Cluster 13 B2 NA Division 03 29-Jul-2017 30-Jul-2017 9:00 AM 30-Jul-2017 A Approved Closed
Cluster 13, B2
Concrete sampling , testing and placement inspection for RC column
1351 KHEP-CI-1351 ground floor Cluster 12 B2 NA Division 03 29-Jul-2017 30-Jul-2017 9:00 AM 30-Jul-2017 A Approved Closed
Cluster 12, B2
Second Coat, Damp Proofing Installation Inspection for RC footing &
Cluster 9,
1352 KHEP-CI-1352 Column Neck
BC4
NA Division 07 29-Jul-2017 30-Jul-2017 9:30 AM 31-Jul-2017 A Approved Closed
Cluster 9, BC4
Installation of reinforcing steel bar, Embedded item and form closure
inspection for RC Column (First Floor Slab) Excluding Axis
1353 KHEP-CI-1353
( B2,B3,C2,D2,D3,F2,F3,G2,H2,H3)
Cluster 02 A6 NA Division 03 29-Jul-2017 30-Jul-2017 3:00 PM 31-Jul-2017 E Rejected Closed
Cluster 2, A6
Installation of reinforcing steel bar, Embedded item and form closure
inspection for RC Column (First Floor Slab) Excluding Axis (A-J)
1353.1 KHEP-CI-1353-01
( B2,B3,C2,D2,D3,F2,F3,G2,H2,H3)
Cluster 02 A6 NA Division 03 2-Aug-2017 3-Aug-2017 10:00 AM 5-Aug-2017 A Approved Closed
Cluster 2, A6
Termite control surface preparation, installation and final inspection
Cluster 50,
1354 KHEP-CI-1354 for footing
BC4
NA Division 03 29-Jul-2017 30-Jul-2017 3:00 PM 1-Aug-2017 E Rejected Closed
Cluster 50, BC4
Termite control surface preparation, installation and final inspection
Cluster 50,
1354.1 KHEP-CI-1354-01 for footing
BC4
NA Division 03 6-Aug-2017 7-Aug-2017 9:30 AM 10-Aug-2017 A Approved Closed
Cluster 50, BC4
Blinding concrete sampling, Testing and placement inspection for
Cluster 50,
1355 KHEP-CI-1355 footing
BC4
NA Division 03 29-Jul-2017 30-Jul-2017 3:30 PM 1-Aug-2017 E Rejected Closed
Cluster 50, BC4
Blinding concrete sampling, Testing and placement inspection for
Cluster 50,
1355.1 KHEP-CI-1355-01 footing
BC4
NA Division 03 6-Aug-2017 7-Aug-2017 10:30 AM 10-Aug-2017 A Approved Closed
Cluster 50, BC4
Compaction test 1st and final layer Structural fill (Selected fill)
Cluster
1356 KHEP-CI-1356
26,BC4
Zone 2B Division 31 29-Jul-2017 30-Jul-2017 10:30 AM 1-Aug-2017 E Rejected Closed
Zone 2B, Cluster 26,BC4
Compaction test 1st and final layer Structural fill (Selected fill)
Cluster
1356.1 KHEP-CI-1356-01
26,BC4
Zone 2B Division 31 2-Aug-2017 3-Aug-2017 11:00 AM 5-Aug-2017 E Rejected Closed
Zone 2B, Cluster 26,BC4
Compaction test 1st and final layer Structural fill (Selected fill)
Cluster Approved w/
1356.1 KHEP-CI-1356-02
26,BC4
Zone 2B Division 31 24-Aug-2017 26-Aug-2017 10:00 AM 27-Aug-2017 B comments
Closed
Zone 2B, Cluster 26,BC4
Inspection of excavated and Compaction formation for Pipe trench
Storm Maine line Dia 400mm, (Along Alley 2 & 11 )
1357 KHEP-CI-1357 Zone 1B, Line 13 Zone 1B Division 31 29-Jul-2017 30-Jul-2017 10:00 AM 1-Aug-2017 E Rejected Closed
Line 13, MH-139-L13 to MH-140-L13 M.H. Dia 1500 and MH-141-L13
to MH-142-L13 M.H. Dia 1500
Inspection of excavated and Compaction formation for Pipe trench
Storm Maine line Dia 400mm, (Along Alley 2 & 11 )
1357.1 KHEP-CI-1357-01 Zone 1B, Line 13 Zone 1B Division 31 2-Aug-2017 3-Aug-2017 10:00 AM 5-Aug-2017 A Approved Closed
Line 13, MH-139-L13 to MH-140-L13 and MH-141-L13 to MH-142-
L13
Compaction test of Sand Bedding Under Pipe Trench - Storm Maine
Line Dia 400mm
1358 KHEP-CI-1358
Zone 1B, Line 13, MH-I41-L13 to MH-I42-L13 and MH-I42-L13
Line 13 Zone 1B Division 31 29-Jul-2017 30-Jul-2017 11:30 AM 1-Aug-2017 A Approved Closed
to MH-45-L13
Compaction test excavated formation level bottom of foundation
Cluster 25,
1359 KHEP-CI-1359 Zone
BC 4
Zone 2B Division 31 30-Jul-2017 31-Jul-2017 11:30 AM 1-Aug-2017 A Approved Closed
2B, Cluster 25, BC 4
Compaction test 1st and final layer Structural fill (Selected fill)
Cluster
1360 KHEP-CI-1360
22,BC4
Zone 2B Division 31 30-Jul-2017 31-Jul-2017 11:30 AM 1-Aug-2017 A Approved Closed
Zone 2B, Cluster 22,BC4
Second Coat, Damp Proofing Installation Inspection for CMU, Mortar
and Masonry Inspection Under Exterior Reinforced Grad beam Cluster 44,
1361 KHEP-CI-1361
A6
NA Division 07 30-Jul-2017 31-Jul-2017 10:00 AM 1-Aug-2017 E Rejected Closed
Cluster 44, A6
Second Coat, Damp Proofing Installation Inspection for CMU, Mortar
and Masonry Inspection Under Exterior Reinforced Grad beam Cluster 44,
1361.1 KHEP-CI-1361-01
A6
NA Division 07 2-Aug-2017 3-Aug-2017 10:00 AM 6-Aug-2017 A Approved Closed
Cluster 44, A6
Cast in place concrete formwork inspection for RC Footing Cluster 18
1362 KHEP-CI-1362
Cluster 18, BC4 BC4
NA Division 03 30-Jul-2017 31-Jul-2017 3:00 PM 1-Aug-2017 A Approved Closed

Installation of reinforcing steel bar, Embedded item and form closure


Cluster 18
1363 KHEP-CI-1363 inspection for RC Footing
BC4
NA Division 03 30-Jul-2017 31-Jul-2017 3:00 PM 1-Aug-2017 A Approved Closed
Cluster 18, BC4
First Coat, Damp Proofing Installation Inspection for CMU, Mortar
and Masonry Inspection Under Exterior Reinforced Grad beam
1364 KHEP-CI-1364 Cluster 71, B2 NA Division 03 30-Jul-2017 31-Jul-2017 10:00 AM 1-Aug-2017 E Rejected Closed
Cluster 71, B2
First Coat, Damp Proofing Installation Inspection for CMU, Mortar
and Masonry Inspection Under Exterior Reinforced Grad beam
1364.1 KHEP-CI-1364-01 Cluster 71, B2 NA Division 03 2-Aug-2017 3-Aug-2017 10:00 AM 6-Aug-2017 A Approved Closed
Cluster 71, B2
Concrete sampling , testing and placement inspection for RC Stair
1365 KHEP-CI-1365 (ground floor) First Flight Cluster 68, B2 NA Division 03 30-Jul-2017 31-Jul-2017 9:00 AM 1-Aug-2017 E Rejected Closed
Cluster 68, B2
Concrete sampling , testing and placement inspection for RC Stair
Approved w/
1365.1 KHEP-CI-1365-01 (ground floor) First Flight Cluster 68, B2 NA Division 03 6-Aug-2017 7-Aug-2017 9:00 AM 10-Aug-2017 B comments
Closed
Cluster 68, B2
Installation of reinforcing steel bar, Embedded item and form closure
1366 KHEP-CI-1366 inspection for RC First floor Slab & Stair Cluster 15 B2 NA Division 03 30-Jul-2017 31-Jul-2017 10:00 AM 2-Aug-2017 A Approved Closed
Cluster 15, B2
Inspection of excavated and Compaction formation for Pipe trench
Sewer Maine line Dia 200mm
1367 KHEP-CI-1367 Zone 3B, Line 23 & 24, MH-2-L23 Line 23 & 24 Zone 3B Division 31 30-Jul-2017 31-Jul-2017 11:00 AM 1-Aug-2017 A Approved Closed
to MH-1-L23 and MH-1-L23 to MH-1a-L23 and MH-1a-L23 to MH-17-
L02 and MH-1-L24 to MH-1a-L24 and MH-1a-L24 to MH-1-L23
Back filling General Fill 1st Layer for pipe trench - Storm Maine line
Dia 400mm
1368 KHEP-CI-1368
Zone 4B, Line 30, MH-106-L30 to MH-107-L30 and MH-
Line 30 Zone 4B Division 31 30-Jul-2017 31-Jul-2017 10:00 AM 1-Aug-2017 A Approved Closed
107-L30 to MH-107a-L30 and MH-107a-L30 to MH-108-L27
Inspection of concrete pouring and sampling for base & wall for
1369 KHEP-CI-1369 Storm Manholes Storm main line Zone 1B, Line 8, Line 8 Zone 1B Division 31 30-Jul-2017 31-Jul-2017 10:00 AM 1-Aug-2017 E Rejected Closed
MH-26a-L08, M.H Dia 1200
Inspection of concrete pouring and sampling for base & wall for
1369.1 KHEP-CI-1369-01 Storm Manholes Storm main line Zone 1B, Line 8, Line 8 Zone 1B Division 31 2-Aug-2017 3-Aug-2017 10:00 AM 5-Aug-2017 A Approved Closed
MH-26a-L08, M.H Dia 1200
Termite control surface preparation, installation and final inspection
Cluster 77,
1370 KHEP-CI-1370 for footing
BC4
NA Division 03 31-Jul-2017 1-Aug-2017 10:00 AM 3-Aug-2017 E Rejected Closed
Cluster 77, BC4
Termite control surface preparation, installation and final inspection
Cluster 77,
1370.1 KHEP-CI-1370-01 for footing
BC4
NA Division 03 12-Aug-2017 13-Aug-2017 3:00 PM 13-Aug-2017 A Approved Closed
Cluster 77, BC4
Blinding concrete sampling, Testing & placement inspection for
Cluster 77,
1371 KHEP-CI-1371 Footing Cluster
BC4
NA Division 03 31-Jul-2017 1-Aug-2017 10:00 AM 3-Aug-2017 E Rejected Closed
77, BC4
Blinding concrete sampling, Testing & placement inspection for
Cluster 77,
1371.1 KHEP-CI-1371-01 Footing Cluster
BC4
NA Division 03 12-Aug-2017 13-Aug-2017 3:00 PM 14-Aug-2017 A Approved Closed
77, BC4
70 cm, CMU,morter and masonry inspection under exterior reinforced
1372 KHEP-CI-1372 Grad Beam Cluster Cluster 73, B2 NA Division 04 31-Jul-2017 1-Aug-2017 10:00 AM 1-Aug-2017 A Approved Closed
73, B2
Compaction test 1st and final layer Structural fill (Selected fill)
Cluster 55,
1373 KHEP-CI-1373
BC4
Zone 3B Division 31 31-Jul-2017 1-Aug-2017 11:30 AM 2-Aug-2017 A Approved Closed
Zone 3B, Cluster 55, BC4
Inspection of Sand filling around the Pipe Sewer Maine Line Dia
200mm
1374 KHEP-CI-1374 Zone 2B, Line 12 & 11, MH-3-L12 to MH-2-L12 and MH- Line 12 & 11 Zone 2B Division 31 31-Jul-2017 1-Aug-2017 11:00 AM 2-Aug-2017 A Approved Closed
2-L12 to MH-1-L12 and MH-1a-L12 to MH-12-L01 and MH-1-L11 to
MH-1a-L11 and MH-1a-L11 to MH-2-L12
Inspection of Sand filling around the Pipe Sewer Maine Line Dia
200mm
Zone 2B, Line 27 & 28, MH-5-L27 to MH-4-L27 and MH-4-L27
1375 KHEP-CI-1375
to MH-3-L27 and MH-3-L27 to MH-2-L27 and MH-2-L27 to MH-1-L27
Line 27 & 28 Zone 2B Division 31 31-Jul-2017 1-Aug-2017 11:00 AM 2-Aug-2017 A Approved Closed
and MH-1-L27 to MH-13-L02 and MH-1-L28 to MH-1a-L28 and MH-
1a-L28 to MH-2-L27
Concrete sampling , testing and placement inspection for RC Column
1376 KHEP-CI-1376 (ground floor) Cluster 11 B2 NA Division 03 31-Jul-2017 1-Aug-2017 9:00 AM 2-Aug-2017 A Approved Closed
Cluster 11, B2

Cast in place concrete Form work inspection for RC Column (Ground


1377 KHEP-CI-1377
Floor) Axis (B2,B3,D2,D3,A6,E6,A3,E3) Cluster 10, B2
Cluster 10 B2 NA Division 03 31-Jul-2017 1-Aug-2017 3:00 PM 3-Aug-2017 A Approved Closed

Blinding concrete sampling, Testing & placement inspection for


Manhole Storm Main Line Zone 1B, Line 10 & 11
1378 KHEP-CI-1378
Line 10 & 11 & 16 & 13, MH-I31-L10 to MH-I33-L11 and MH-I34- & 16 & 13
Zone 1B Division 03 31-Jul-2017 1-Aug-2017 3:00 PM 5-Aug-2017 A Approved Closed
L11 to MH-I53-L16 and MH-I39-L13 to MH-I40-L13 and MH-I41-L13

Installation of reinforcing steel bar, Embedded item and form closure


1379 KHEP-CI-1379 inspection for RC Stair (First Floor - Ground floor) Cluster 14 B2 NA Division 03 1-Aug-2017 2-Aug-2017 10:00 AM 3-Aug-2017 A Approved Closed
Cluster 14, B2
Compaction test of sand bedding under pipe trench - storm main
line Dia 200mm Zone
1380 KHEP-CI-1380 3B, Line 23 & 24, MH-2-L23 to MH-1-L23 and MH-1-L23 to MH-1a- Line 23 & 24 Zone 3B Division 31 1-Aug-2017 2-Aug-2017 11:00 AM 3-Aug-2017 A Approved Closed
L23 and MH-1a-L23 to MH-17-L02 and MH-1-L24 to MH-1a-L24 and
MH-1a-L24 to MH-1-L23
Inspection of Reinforcement steel bar for storm manholes storm
Approved w/
1381 KHEP-CI-1381 main line Line 8 Zone 1B Division 31 1-Aug-2017 2-Aug-2017 10:00 AM 5-Aug-2017 B comments
Closed
Zone 1B, Line 8, MH-26-L08 M.H. Dia 1200
Inspection of Reinforcement steel bar for storm manholes storm
Approved w/
1382 KHEP-CI-1382 main line Line 11 Zone 1B Division 31 1-Aug-2017 2-Aug-2017 10:00 AM 5-Aug-2017 B comments
Closed
Zone 1B, Line 11, MH-26-L08 M.H. Dia 1200
Back filling General Fill 1st Layer for pipe trench - Storm Maine line
Dia 500mm & 600mm Zone
1383 KHEP-CI-1383
2B, Line 18, MH-62-L18 to MH-63-L18 and MH-63-L18 to MH-64-
Line 18 Zone 2B Division 31 1-Aug-2017 2-Aug-2017 11:00 AM 2-Aug-2017 A Approved Closed
L18 and MH-64-L18 to MH-74-L18
Concrete sampling , testing and placement inspection for RC First
1384 KHEP-CI-1384 Floor Slab Cluster 15 B2 NA Division 03 2-Aug-2017 3-Aug-2017 9:30 AM 5-Aug-2017 A Approved Closed
Cluster 15, B2
Concrete sampling , testing and placement inspection for RC Footing
Cluster 18
1385 KHEP-CI-1385
BC4
NA Division 03 2-Aug-2017 3-Aug-2017 9:00 AM 5-Aug-2017 A Approved Closed
Cluster 18, BC4
Installation of reinforcing steel bar, Embedded item and form closure
inspection for RC Column (Ground Floor) Axis
1386 KHEP-CI-1386
(B2,B3,D2,D3,A6,E6,A3,E3)
Cluster 10 B2 NA Division 03 2-Aug-2017 3-Aug-2017 10:00 AM 5-Aug-2017 A Approved Closed
Cluster 10, B2
Compaction test excavated formation level bottom of foundation
Cluster 56,
1387 KHEP-CI-1387 Zone
BC 4
Zone 3B Division 31 2-Aug-2017 3-Aug-2017 10:00 AM 5-Aug-2017 A Approved Closed
3B, Cluster 56, BC 4
Inspection of excavated and Compaction formation for Pipe trench
Storm Maine line Dia 800mm Zone
4B, Line 27 & 26, MH-114-L27 to MH-115-L27 and MH-115-L27 to
1388 KHEP-CI-1388
MH-116-L27 and MH-116-L27 to MH-117-L27 and MH-117-L27 to
Line 27 & 26 Zone 4B Division 31 2-Aug-2017 3-Aug-2017 11:00 AM 7-Aug-2017 E Rejected Closed
MH-118-L26 and MH-118-L26 to MH-119-L26 and MH-119-L26 to
MH-120-L26
Inspection of excavated and Compaction formation for Pipe trench
Storm Maine line Dia 800mm Zone Approved w/
1388.1 KHEP-CI-1388-01
4B, Line 26, MH-117-L27 to MH-118-L26 and MH-118-L26 to MH-
Line 26 Zone 4B Division 31 8-Aug-2017 9-Aug-2017 10:30 AM 10-Aug-2017 B comments
Closed
119-L26 and MH-119-L26 to MH-120-L26
Inspection of excavated and Compaction formation for Pipe trench
Sewer Maine line Dia 200mm Zone 1B,
1389 KHEP-CI-1389 Line 26, MH-4-L26 to MH-3-L26 and MH-3-L26 to MH-2-L26 and MH- Line 26 Zone 1B Division 31 2-Aug-2017 3-Aug-2017 11:30 AM 5-Aug-2017 A Approved Closed
2-L26 to MH-1-L26 and MH-1-L26 to MH-1a-L26 and MH-1a-L26 to
MH-15-L02
Compaction test of Sand Filling Above the pipe trench and laying
warning tape Sewer Maine Line Dia 200mm Zone 2B, Line
1390 KHEP-CI-1390 27 & 28, MH-57-L27 to MH-4-L27 and MH-4-L27 to MH-3-L27 and Line 27 & 28 Zone 2B Division 31 2-Aug-2017 3-Aug-2017 11:30 AM 6-Aug-2017 A Approved Closed
MH-3-L27 to MH-2-L27 and MH-2-L27 to MH-1-L27 and MH-1-L27
to MH-13-L02

Compaction test of Sand Filling Above the pipe trench and laying
1391 KHEP-CI-1391 warning tape Sewer Maine Line Dia 200mm Zone 2B, Line 27 Zone 2B Division 31 2-Aug-2017 3-Aug-2017 11:30 AM 6-Aug-2017 A Approved Closed
Line 28, MH-1-L28 to MH-1a-L28 and MH-1a-L28 to MH-2-L27

Inspection of Sand filling around the Pipe Storm Maine Line Dia
400mm
1392 KHEP-CI-1392 Zone 1B, Line 13, MH-I39-L13 to MH-I40-L13 and MH-I40- Line 13 Zone 1B Division 31 2-Aug-2017 3-Aug-2017 11:00 AM 5-Aug-2017 A Approved Closed
L13 to MH-I41-L13 and MH-I41-L13 to MH-I42-L13 and MH-I42-L13
to MH-45-L13
Inspection of Sand filling around the Pipe Sewer Maine Line Dia
200mm
1393 KHEP-CI-1393 Zone 1B, Line 2, MH-14-L02 to MH-13-L02 and MH-13-L02 Line 2 Zone 1B Division 31 2-Aug-2017 3-Aug-2017 10:30 AM 5-Aug-2017 A Approved Closed
to MH-12-L02 and MH-12-L02 to MH-11-L02 and MH-11-L02 to MH-
10-L02 and MH-10-L02 to MH-09-L02
Blinding concrete sampling, Testing & placement inspection for
1394 KHEP-CI-1394 Manhole Storm Main Line Line 13 Zone 1B Division 03 2-Aug-2017 3-Aug-2017 10:00 AM 5-Aug-2017 A Approved Closed
Zone 1B, Line 13, MH-I42-L13
Back filling General Fill Final Layer for pipe trench - Storm Maine line
Dia 400mm Approved w/
1395 KHEP-CI-1395
Zone 2B, Line 1, MH-3-L01 to MH-6-L01 and MH-6-L01
Line 1 Zone 2B Division 31 3-Aug-2017 5-Aug-2017 11:00 AM 5-Aug-2017 B comments
Closed
to MH-132-L35
Concrete sampling , testing and placement inspection for RC Grade
1396 KHEP-CI-1396 Beam Cluster 5, B2 NA Division 03 3-Aug-2017 5-Aug-2017 9:30 AM 5-Aug-2017 A Approved Closed
Cluster 5, B2
70 cm, CMU,morter and masonry inspection under exterior reinforced
1397 KHEP-CI-1397 Grad Beam Cluster 19 B2 NA Division 04 3-Aug-2017 5-Aug-2017 2:30 PM 7-Aug-2017 A Approved Closed
Cluster 19, B2
Installation of reinforcing steel bar, Embedded item and form closure
Cluster 18
1398 KHEP-CI-1398 inspection for RC Column Neck
BC4
NA Division 03 3-Aug-2017 5-Aug-2017 3:00 PM 6-Aug-2017 A Approved Closed
Cluster 18, BC4
Installation of reinforcing steel bar, Embedded item and form closure
inspection for RC Column (Ground Floor) Excluding Axis
1399 KHEP-CI-1399
(B2,B3,D2,D3,A6,E6,A3,E3)
Cluster 17 B2 NA Division 03 3-Aug-2017 5-Aug-2017 10:30 AM 6-Aug-2017 A Approved Closed
Cluster 17, B2
Installation of reinforcing steel bar, Embedded item and form closure
inspection for RC Column (Ground Floor) Excluding Axis
1400 KHEP-CI-1400
(B2,B3,D2,D3,A6,E6,A3,E3)
Cluster 15 B2 NA Division 03 3-Aug-2017 5-Aug-2017 10:30 AM 6-Aug-2017 A Approved Closed
Cluster 15, B2
Installation of reinforcing steel bar, Embedded item and form closure
inspection for RC Column (First Floor) Axis (K-N) Excluding Axis
1401 KHEP-CI-1401
(K2,K3,L2,M2,M3)
Cluster 02 A6 NA Division 03 3-Aug-2017 5-Aug-2017 9:00 AM 6-Aug-2017 A Approved Closed
Cluster 2, A6

Inspection of excavated and Compaction formation for Pipe trench


1402 KHEP-CI-1402 Sewer Maine line Dia 200mm Zone 3B, Line Line 25 Zone 3B Division 31 3-Aug-2017 5-Aug-2017 11:30 AM 6-Aug-2017 A Approved Closed
25, MH-1-L25 to MH-1a-L25 and MH-1a-L25 to MH-1-L26

Inspection of reinforcing steel bar for Storm Inlet manhole Storm


main line
1403 KHEP-CI-1403
Zone 1B, Line 10 & 13, MH-I31-L10 and MH-I39-L13 and
Line 10 & 13 Zone 1B Division 31 8-Aug-2017 9-Aug-2017 10:00 AM 10-Aug-2017 E Rejected Closed
MH-I40-L13 (Square)
Inspection of reinforcing steel bar for Storm Inlet manhole Storm
main line
1403.1 KHEP-CI-1403-01
Zone 1B, Line 10 & 13, MH-131-L10 and MH-139-L13 and
Line 10 & 13 Zone 1B Division 31 15-Aug-2017 16-Aug-2017 10:00 AM 17-Aug-2017 A Approved Closed
MH-140-L13 (Square)
First Coat, Damp Proofing Installation Inspection for CMU, Mortar
and Masonry Inspection Under Exterior Reinforced Grad beam
1404 KHEP-CI-1404 Cluster 75, B2 NA Division 07 6-Aug-2017 7-Aug-2017 10:00 AM 8-Aug-2017 A Approved Closed
Cluster 75, B2

Cast in place concrete Form work inspection for RC Column (Ground


1405 KHEP-CI-1405
Floor) Axis (B2,B3,D2,D3,A6,E6,A3,E3) Cluster 10, B2
Cluster 10 B2 NA Division 03 6-Aug-2017 7-Aug-2017 10:30 AM 8-Aug-2017 A Approved Closed

Concrete sampling , testing and placement inspection for RC Stair


1406 KHEP-CI-1406 (First Flight) Ground floor Cluster 14 B2 NA Division 03 6-Aug-2017 7-Aug-2017 9:00 AM 10-Aug-2017 A Approved Closed
Cluster 14, B2
Cast in place concrete Form work inspection for RC Column (First
1407 KHEP-CI-1407 Floor) Axis (A-E) Excluding Axis (B2,B3,C2,D2,D3) Cluster 02 A6 NA Division 03 6-Aug-2017 7-Aug-2017 10:00 AM 8-Aug-2017 E Rejected Closed
Cluster 2, A6
Cast in place concrete Form work inspection for RC Column (First
1407.1 KHEP-CI-1407-01 Floor) Axis (A-E) Excluding Axis (B2,B3,C2,D2,D3) Cluster 02 A6 NA Division 03 10-Aug-2017 12-Aug-2017 9:00 AM 15-Aug-2017 A Approved Closed
Cluster 2, A6
Cast in place concrete Form work inspection for RC Stair (Ground
1408 KHEP-CI-1408 floor) First Flight Cluster 12 B2 NA Division 03 6-Aug-2017 7-Aug-2017 10:00 AM 8-Aug-2017 A Approved Closed
Cluster 12, B2

Installation of reinforcing steel bar, Embedded item and form closure


1409 KHEP-CI-1409
inspection for RC (First Flight- Ground floor) Cluster 12, B2
Cluster 12 B2 NA Division 03 6-Aug-2017 7-Aug-2017 10:00 AM 8-Aug-2017 A Approved Closed

Termite control surface preparation, installation and final inspection


Cluster 55,
1410 KHEP-CI-1410 for footing
BC4
NA Division 03 6-Aug-2017 7-Aug-2017 10:00 AM 10-Aug-2017 A Approved Closed
Cluster 55, BC4
Blinding concrete sampling, Testing & placement inspection for
Cluster 55,
1411 KHEP-CI-1411 Footing Cluster
BC4
NA Division 03 6-Aug-2017 7-Aug-2017 11:00 AM 10-Aug-2017 A Approved Closed
55, BC4
Compaction test 1st and final layer Structural fill (Selected fill)
Cluster 56,
1412 KHEP-CI-1412
BC4
Zone 3B Division 31 6-Aug-2017 7-Aug-2017 10:00 AM 8-Aug-2017 A Approved Closed
Zone 3B, Cluster 56, BC4
Compaction test of Sand Bedding Under Pipe Trench - Sewer Maine
Line Dia 200mm Zone 3B,
Line 26 & 25, MH-4-L26 to MH-3-L26 and MH-3-L26 to MH-2-L26
1413 KHEP-CI-1413
and MH-2-L26 to MH-1-L26 and MH-1-L26 to MH-1a-L26 and MH-
Line 26 & 25 Zone 3B Division 31 6-Aug-2017 7-Aug-2017 11:00 AM 8-Aug-2017 A Approved Closed
1a-L26 to MH-15-L02 and MH-1-L25 to MH-1a-L25 and MH-1a-L25
to MH-1-L26
Inspection of Sand filling around the Pipe Storm Maine Line Dia
1414 KHEP-CI-1414 400mm Line 16 Zone 1B Division 31 6-Aug-2017 7-Aug-2017 10:30 AM 8-Aug-2017 A Approved Closed
Zone 1B, Line 16, MH-I53-L16 to MH-54-L15
Compaction test 1st and final layer Structural fill (Selected fill)
Cluster 25,
1415 KHEP-CI-1415
BC4
Zone 2B Division 31 6-Aug-2017 7-Aug-2017 10:15 AM 8-Aug-2017 A Approved Closed
Zone 2B, Cluster 25, BC4
Second Coat, Damp Proofing Installation Inspection for CMU, Mortar
and Masonry Inspection Under Exterior Reinforced Grad beam
1416 KHEP-CI-1416 Cluster 71, B2 NA Division 07 6-Aug-2017 7-Aug-2017 10:00 AM 8-Aug-2017 A Approved Closed
Cluster 71, B2
First Coat, Damp Proofing Installation Inspection for CMU, Mortar
and Masonry Inspection Under Exterior Reinforced Grad beam Cluster 16
1417 KHEP-CI-1417
BC4
NA Division 07 6-Aug-2017 7-Aug-2017 10:00 AM 8-Aug-2017 A Approved Closed
Cluster 16, BC4
Damp Proofing surface Preparation for RC Foundation & Column
Cluster 21,
1418 KHEP-CI-1418 Neck
BC4
NA Division 07 6-Aug-2017 7-Aug-2017 10:00 AM 8-Aug-2017 A Approved Closed
Cluster 21, BC4
70 cm, CMU,morter and masonry inspection under exterior reinforced
1419 KHEP-CI-1419 Grad Beam Cluster Cluster 8, B2 NA Division 04 6-Aug-2017 7-Aug-2017 9:30 AM 8-Aug-2017 A Approved Closed
8, B2
Cast in place concrete Form work inspection for RC Grad Beam
1420 KHEP-CI-1420 Cluster 3, A6 NA Division 03 6-Aug-2017 7-Aug-2017 3:00 PM 9-Aug-2017 A Approved Closed
Cluster 3, A6

Installation of reinforcing steel bar, Embedded item and form closure


1421 KHEP-CI-1421
inspection for RC Grade Beam Cluster 3, A6
Cluster 3, A6 NA Division 03 6-Aug-2017 7-Aug-2017 3:00 PM 9-Aug-2017 A Approved Closed

Cast in place concrete Form work inspection for RC First Floor Slab
1422 KHEP-CI-1422 Cluster 13 B2 NA Division 03 6-Aug-2017 7-Aug-2017 10:30 AM 9-Aug-2017 A Approved Closed
Cluster 13, B2

Installation of reinforcing steel bar, Embedded item and form closure


1423 KHEP-CI-1423
inspection for RC First Floor Slab Cluster 13, B2
Cluster 13 B2 NA Division 03 6-Aug-2017 7-Aug-2017 10:00 AM 9-Aug-2017 A Approved Closed

Inspection of excavated and Compaction formation for Pipe trench


1424 KHEP-CI-1424 Storm Maine line Dia 500mm Zone Line 18 Zone 2B Division 31 6-Jul-2017 7-Jul-2017 11:30 AM 8-Aug-2017 A Approved Closed
2B, Line 18, MH-61-L18 to MH-62-L18

Back filling General Fill final Layer for pipe trench - Sewer Maine line
Dia 200mm
Approved w/
1425 KHEP-CI-1425 Zone 2B, Line 30 & 29, MH-3-L30 to MH-2-L30 and MH-2-L30 to Line 30 & 29 Zone 2B Division 31 6-Jul-2017 7-Jul-2017 11:00 AM 8-Aug-2017 B comments
Closed
MH-1-L30 and MH-1-L30 to MH-1a-L30 and MH-1a-L30 to MH-11-
L02 and MH-1-L29 to MH-1a-L29 and MH-1a-L29 to MH-1-L30

Cast in place concrete Form work inspection for RC Column (Ground


1426 KHEP-CI-1426 Floor) Axis (F-H) Excluding Axis (F2,F3,G2,H2,H3) Cluster 02 A6 NA Division 03 6-Aug-2017 7-Aug-2017 3:30 PM 9-Aug-2017 A Approved Closed
Cluster 2, A6
Cast in place concrete Form work inspection for RC Column (Ground
Floor) Excluding Axis (B2,B3,D2,D3,A6,E6,A3,E3)
1427 KHEP-CI-1427
Cluster 17,
Cluster 17 B2 NA Division 03 7-Aug-2017 8-Aug-2017 2:00 PM 10-Aug-2017 A Approved Closed
B2
Cast in place concrete Form work inspection for RC Column (First
Floor) Exculuding Axis (B2,B3,D2,D3,A6,E6,A3,E3)
1428 KHEP-CI-1428
Cluster 15,
Cluster 15 B2 NA Division 03 7-Aug-2017 8-Aug-2017 2:00 PM 10-Aug-2017 A Approved Closed
B2
70 cm, CMU,morter and masonry inspection under exterior reinforced
Cluster 6,
1429 KHEP-CI-1429 Grad Beam Cluster
BC4
NA Division 04 7-Aug-2017 8-Aug-2017 3:00 PM 8-Aug-2017 A Approved Closed
6, BC4
Inspection of excavated and Compaction formation for Pipe trench
1430 KHEP-CI-1430 Storm Maine line Dia 800mm Zone Line 26 Zone 4B Division 31 7-Aug-2017 8-Aug-2017 11:30 AM 10-Aug-2017 A Approved Closed
4B, Line 26, MH-125-L26 to MH-126-L26

Inspection of excavated and Compaction formation for Pipe trench


Approved w/
1431 KHEP-CI-1431 Storm Maine line Dia 400mm Zone Line 24 Zone 4B Division 31 7-Aug-2017 8-Aug-2017 11:00 AM 9-Aug-2017 B comments
Closed
4B, Line 24, MH-94-L25 to MH-95-L24 and MH-95-L24 to MH-93-L24

Compaction test of Sand Filling Above the pipe trench and laying
Approved w/
1432 KHEP-CI-1432 warning tape Sewer Maine Line Dia 200mm Zone 4B, Line Line 17 Zone 4B Division 31 7-Aug-2017 8-Aug-2017 11:30 AM 9-Aug-2017 B comments
Closed
17, MH-1-L17 to MH-17-L01

Back filling General Fill final Layer for pipe trench - Sewer Maine line
Dia 200mm
Approved w/
1433 KHEP-CI-1433 Zone 2B, Line 9 & 10, MH-3-L09 to MH-2-L09 and MH-2-L09 to Line 9 & 10 Zone 2B Division 31 7-Aug-2017 8-Aug-2017 11:00 AM 9-Aug-2017 B comments
Closed
MH-1-L09 and MH-1-L09 to MH-1a-L09 and MH-1a-L09 to MH-9-L01
and MH-1-L10 to MH-1a-L10 and MH-1a-L10 to MH-1-L09

Cast in place concrete Form work inspection for Storm Manholes


Approved w/
1434 KHEP-CI-1434 Storm main Line Line 8 Zone 1B Division 31 7-Aug-2017 8-Aug-2017 10:30 AM 10-Aug-2017 B comments
Closed
Zone 1B, Line 8, MH-26-L08 M.H.Dia 1200
Cast in place concrete Form work inspection for Storm Manholes
Storm main Line Line 10 & 11
1435 KHEP-CI-1435
Zone 1B, Line 10 & 11 & 13, MH-I31-L10 and MH-I33-L11 and & 13
Zone 1B Division 31 7-Aug-2017 8-Aug-2017 10:30 AM 9-Aug-2017 E Rejected Closed
MH-I39-L13 and MH-I40-L13 (Square)
Inspection Form work for base & wall and concrete pouring for Storm
Manholes (Precast yard) Line 10 & 11 Approved w/
1435.1 KHEP-CI-1435-01
Zone 1B, Line 10 & 11 & 13, MH-I31-L10 and MH-I33- & 13
Zone 1B Division 31 15-Aug-2017 15-Aug-2017 10:30 AM 17-Aug-2017 B comments
Closed
L11 and MH-I39-L13 and MH-I40-L13 (Square)
Inspection of excavated and Compaction formation for Pipe trench
Storm Maine line Dia 800mm Zone Approved w/
1436 KHEP-CI-1436
4B, Line 27, MH-114-L27 to MH-115-L27 and MH-115-L27 to MH-
Line 27 Zone 4B Division 31 8-Aug-2017 9-Aug-2017 10:30 AM 10-Aug-2017 B comments
Closed
116-L27 and MH-116-L27 to MH-117-L27

Sampling general fill materials Jobsite Stock Approved w/


1437 KHEP-CI-1437
Jobsite Stock Pile 11 Pile 11
NA Division 31 8-Aug-2017 9-Aug-2017 10:30 AM 10-Aug-2017 B comments
Closed

Sampling general fill materials Jobsite Stock Approved w/


1438 KHEP-CI-1438
Jobsite Stock Pile 12 Pile 12
NA Division 31 8-Aug-2017 9-Aug-2017 10:30 AM 10-Aug-2017 B comments
Closed

Second Coat, Damp Proofing Installation Inspection for CMU, Mortar


and Masonry Inspection Under Exterior Reinforced Grad beam Cluster 16
1439 KHEP-CI-1439
BC4
NA Division 07 8-Aug-2017 9-Aug-2017 10:00 AM 10-Aug-2017 A Approved Closed
Cluster 16, BC4
Second Coat, Damp Proofing Installation Inspection for CMU, Mortar
and Masonry Inspection Under Exterior Reinforced Grad beam
1440 KHEP-CI-1440 Cluster 75, B2 NA Division 07 8-Aug-2017 9-Aug-2017 10:00 AM 10-Aug-2017 A Approved Closed
Cluster 75, B2
First Coat, Damp Proofing Installation Inspection for CMU, Mortar
and Masonry Inspection Under Exterior Reinforced Grad beam
1441 KHEP-CI-1441 Cluster 73, B2 NA Division 07 8-Aug-2017 9-Aug-2017 3:00 PM 10-Aug-2017 A Approved Closed
Cluster 73, B2
First Coat, Damp Proofing Installation Inspection for CMU, Mortar
and Masonry Inspection Under Exterior Reinforced Grad beam
1442 KHEP-CI-1442 Cluster 19 B2 NA Division 07 8-Aug-2017 9-Aug-2017 3:00 PM 10-Aug-2017 A Approved Closed
Cluster 19, B2
Concrete sampling , testing and placement inspection for RC Stair
Approved w/
1443 KHEP-CI-1443 (First Flight, Ground floor) Cluster 12 B2 NA Division 03 8-Aug-2017 9-Aug-2017 9:00 AM 10-Aug-2017 B comments
Closed
Cluster 12, B2
Concrete sampling , testing and placement inspection for RC Column
1444 KHEP-CI-1444 ( Ground floor) Cluster Cluster 10 B2 NA Division 03 8-Aug-2017 9-Aug-2017 9:00 AM 10-Aug-2017 E Rejected Closed
10, B2
70 cm, CMU,morter and masonry inspection under exterior reinforced
1445 KHEP-CI-1445 Grad Beam Cluster Cluster 20 B2 NA Division 04 8-Aug-2017 9-Aug-2017 2:30 PM 12-Aug-2017 A Approved Closed
20, B2
Installation of reinforcing steel bar, Embedded item and form closure
inspection for RC Column (First floor) Axis
1446 KHEP-CI-1446
(B2,B3,C2,D2,D3,F2,F3,G2,H2,H3,K2,K3,L2,M2,M3)
Cluster 02 A6 NA Division 03 8-Aug-2017 9-Aug-2017 10:30 AM 12-Aug-2017 A Approved Closed
Cluster 2, A6
Installation of reinforcing steel bar, Embedded item and form closure
inspection for RC Column (Ground floor) Axis
1447 KHEP-CI-1447
(B2,B3,D2,D3,A6,E6,A3,E3)
Cluster 17 B2 NA Division 03 8-Aug-2017 9-Aug-2017 10:30 AM 10-Aug-2017 A Approved Closed
Cluster 17, B2
Compaction test of sand bedding under pipe trench - Storm main
Approved w/
1448 KHEP-CI-1448 line Dia 500mm Zone Line 18 Zone 3B Division 31 8-Aug-2017 9-Aug-2017 11:00 AM 10-Aug-2017 B comments
Closed
3B, Line 18, MH-61-L18 to MH-62-L18

Inspection of Sand filling around the Pipe Sewer Maine Line Dia
200mm
1449 KHEP-CI-1449 Zone 2B, Line 1, MH-14-L01 to MH-13-L01 and MH-13-L01 to Line 1 Zone 2B Division 31 8-Aug-2017 9-Aug-2017 3:00 PM 10-Aug-2017 A Approved Closed
MH-12-L01 and MH-12-L01 to MH-11-L01 and MH-11-L01 to MH-10-
L01 and MH-10-L01 to MH-9-L01 and MH-9-L01 to MH-8-L01

Compaction test of Sand Filling Above the pipe trench and laying
warning tape Sewer Maine Line Dia 200mm Zone 2B, Line
Approved w/
1450 KHEP-CI-1450 12 & 11, MH-3-L12 to MH-2-L12 and MH-2-L12 to MH-1-L12 and Line 12 & 11 Zone 2B Division 31 8-Aug-2017 9-Aug-2017 11:30 AM 10-Aug-2017 B comments
Closed
MH-1-L12 to MH-12-L01 and MH-1-L11 to MH-1a-L11 and MH-1a-
L11 to MH-2-L11
Concrete sampling , testing and placement inspection for RC First
Approved w/
1451 KHEP-CI-1451 floor Slab Cluster 13 B2 NA Division 03 9-Aug-2017 10-Aug-2017 9:00 AM 14-Aug-2017 B comments
Closed
Cluster 13, B2
Concrete sampling , testing and placement inspection for RC Grade
Approved w/
1452 KHEP-CI-1452 Beam Cluster 13 B2 NA Division 03 9-Aug-2017 10-Aug-2017 9:00 AM 10-Aug-2017 B comments
Closed
Cluster 13, B2
Cast in place concrete Form work inspection for RC Column Neck
Cluster 23,
1453 KHEP-CI-1453
BC4
NA Division 03 9-Aug-2017 10-Aug-2017 3:00 PM 14-Aug-2017 A Approved Closed
Cluster 23, BC4
Installation of reinforcing steel bar, Embedded item and form closure
inspection for RC Column (First Floor) Axis Excluding
1454 KHEP-CI-1454
(B2,B3,D2,D3,A6,E6,A3,E3)
Cluster 13 B2 NA Division 03 9-Aug-2017 10-Aug-2017 2:00 PM 10-Aug-2017 A Approved Closed
Cluster 13, B2
Installation of reinforcing steel bar, Embedded item and form closure
inspection for RC Column (First Floor) Axis
1455 KHEP-CI-1455
(B2,B3,D2,D3,A6,E6,A3,E3)
Cluster 15 B2 NA Division 03 9-Aug-2017 10-Aug-2017 10:00 AM 12-Aug-2017 A Approved Closed
Cluster 15, B2
Termite control surface preparation, installation and final inspection
1456 KHEP-CI-1456 for Grade Beam Cluster 4, A6 NA Division 03 9-Aug-2017 10-Aug-2017 2:30 PM 12-Aug-2017 A Approved Closed
Cluster 4, A6
Blinding concrete sampling, Testing & placement inspection for
Grade Beam
1457 KHEP-CI-1457
Cluster 4, A6
Cluster 4, A6 NA Division 03 9-Aug-2017 10-Aug-2017 2:30 PM 14-Aug-2017 A Approved Closed

Compaction test of Sand Filling Above the pipe trench and laying
warning tape Sewer Maine Line Dia 200mm
Approved w/
1458 KHEP-CI-1458 Zone 2B, Line 2 , MH-14-L02 to MH-13-L02 and MH-13-L02 Line 2 Zone 2B Division 31 9-Aug-2017 10-Aug-2017 10:30 AM 12-Aug-2017 B comments
Closed
to MH-12-L02 and MH-12-L02 to MH-11-L02 and MH-11-L02 to MH-
10-L02 and MH-10-L02 to MH-9-L02
Compaction test of sand bedding under pipe trench - Storm main
Approved w/
1459 KHEP-CI-1459 line Dia 800mm (Along Road 2) Line 26 Zone 5B Division 31 9-Aug-2017 10-Aug-2017 10:15 AM 12-Aug-2017 B comments
Closed
Zone 5B, Line 26, MH-125-L26 to MH-126-L26
Compaction test Last and final layer General fill Cluster 44, Approved w/
1460 KHEP-CI-1460
Zone 1A, Cluster 44, A6 A6
Zone 1A Division 31 10-Aug-2017 12-Aug-2017 10:15 AM 13-Aug-2017 B comments
Closed

Inspection of excavated and Compaction formation for Pipe trench


Sewer Maine line Dia 200mm
Approved w/
1461 KHEP-CI-1461 Zone 3B, Line 16 &15, MH-4-L16 to MH-3-L16 and MH-3-L16 to Line 16 &15 Zone 3B Division 31 10-Aug-2017 12-Aug-2017 10:30 AM 13-Aug-2017 B comments
Closed
MH-3a-L16 and MH-3a-L16 to MH-2-L16 and MH-2-L16 to MH-1-L16
and MH-1-L16 to MH-16-L01 and MH-1-L15 to MH-2-L16

Termite control surface preparation, installation and final inspection


Cluster 22,
1462 KHEP-CI-1462 for Footing
BC4
NA Division 03 10-Aug-2017 12-Aug-2017 2:30 PM 14-Aug-2017 A Approved Closed
Cluster 22, BC4
Blinding concrete sampling, Testing & placement inspection for
Cluster 22,
1463 KHEP-CI-1463 Footing Cluster
BC4
NA Division 03 10-Aug-2017 12-Aug-2017 2:30 PM 14-Aug-2017 A Approved Closed
22, BC4
Cast in place concrete Form work inspection for RC Column (Ground
1464 KHEP-CI-1464 Floor) Axis (B2,B3,D2,D3,A6,E6,A3,E3) Cluster 17 B2 NA Division 03 10-Aug-2017 12-Aug-2017 3:00 PM 14-Aug-2017 A Approved Closed
Cluster 17, B2
First Coat, Damp Proofing Installation Inspection for RC Footing &
Cluster 21,
1465 KHEP-CI-1465 Column Neck
BC4
NA Division 07 10-Aug-2017 12-Aug-2017 10:00 AM 14-Aug-2017 A Approved Closed
Cluster 21, BC4
Cast in place concrete Form work inspection for RC Column (First
Floor) Axis
1466 KHEP-CI-1466 (C2,F2,H3,J4,J3,K1,K2,K4,K5,L3,L4,M1,M2,M3,M4,M5,N1,N2,N3) Cluster 02 A6 NA Division 03 10-Aug-2017 12-Aug-2017 2:00 PM 14-Aug-2017 A Approved Closed

Cluster 2, A6
Cast in place concrete Form work inspection for RC Stair (First Floor
1467 KHEP-CI-1467 Ground floor) Cluster 11 B2 NA Division 31 10-Aug-2017 12-Aug-2017 10:30 AM 14-Aug-2017 A Approved Closed
Cluster 11, B2
Installation of reinforcing steel bar, Embedded item and form closure
inspection for RC Stair (First Floor Ground floor)
1468 KHEP-CI-1468
Cluster
Cluster 11 B2 NA Division 31 10-Aug-2017 12-Aug-2017 10:30 AM 14-Aug-2017 A Approved Closed
11, B2
Compaction test 1st and final layer General fill (Bottom of
Cluster 41,
1469 KHEP-CI-1469 Foundation)
BC4
Zone 2B Division 31 10-Aug-2017 12-Aug-2017 11:30 AM 14-Aug-2017 A Approved Closed
Zone 2B, Cluster 41, BC4
Compaction test 1st and final layer General fill (Bottom of
Cluster 42,
1470 KHEP-CI-1470 Foundation)
BC4
Zone 2B Division 31 10-Aug-2017 12-Aug-2017 11:00 AM 14-Aug-2017 A Approved Closed
Zone 2B, Cluster 42, BC4
Compaction test of sand bedding under pipe trench - Storm main
line Dia 400mm Zone Approved w/
1471 KHEP-CI-1471
4B, Line 25 & 24, MH-94-L25 to MH-95-L25 and MH-95-L24 to MH-
Line 25 & 24 Zone 4B Division 31 10-Aug-2017 12-Aug-2017 11:00 AM 13-Aug-2017 B comments
Closed
93-L24

Compaction test of Sand Filling Above the pipe trench and laying
warning tape Storm Maine Line Dia 800mm Zone 4B, Line 27 Approved w/
1472 KHEP-CI-1472
, MH-114-L27 to MH-111a-L27 and MH-111a-L27 to MH-111-L27
Line 27 Zone 4B Division 31 10-Aug-2017 12-Aug-2017 11:00 AM 13-Aug-2017 B comments
Closed
and MH-111-L27 to MH-110a-L27 and MH-110a-L27 to MH-108-L27

Plate Load Bearing Test Final layer Structural fill Bottom of


Cluster 26, Approved w/
1473 KHEP-CI-1473 Foundation
BC4
Zone 2B Division 31 10-Aug-2017 12-Aug-2017 10:00 AM 13-Aug-2017 B comments
Closed
Zone 2B, Cluster 26, BC4
Plate Load Bearing Test Final layer Structural fill Bottom of
Cluster 26, Approved w/
1473.1 KHEP-CI-1473-01 Foundation
BC4
Zone 2B Division 31 24-Aug-2017 26-Aug-2017 10:00 AM 27-Aug-2017 B comments
Closed
Zone 2B, Cluster 26, BC4
Plate Load Bearing Test Final layer Structural fill Bottom of
Cluster 25, Approved w/
1474 KHEP-CI-1474 Foundation
BC4
Zone 2B Division 31 10-Aug-2017 12-Aug-2017 10:00 AM 14-Aug-2017 B comments
Closed
Zone 2B, Cluster 25, BC4
Plate Load Bearing Test Final layer Structural fill Bottom of
Cluster 25, Approved w/
1474.1 KHEP-CI-1474-01 Foundation
BC4
Zone 2B Division 31 24-Aug-2017 26-Aug-2017 10:00 AM 27-Aug-2017 B comments
Closed
Zone 2B, Cluster 25, BC4
Inspection of concrete pouring and sampling for base & wall for
Approved w/
1475 KHEP-CI-1475 Storm Manholes Storm main line Zone Line 8 Zone 1B Division 31 10-Aug-2017 12-Aug-2017 10:00 AM 14-Aug-2017 B comments
Closed
1B, Line 8, MH-26-L08, M.H Dia 1200
Cast in place concrete Form work inspection for RC Grade Beam
1476 KHEP-CI-1476 Cluster 7, B2 NA Division 03 10-Aug-2017 12-Aug-2017 10:30 AM 14-Aug-2017 A Approved Closed
Cluster 7, B2
Installation of reinforcing steel bar, Embedded item and form closure
1477 KHEP-CI-1477 inspection for RC Grade Beam Cluster 7, B2 NA Division 03 10-Aug-2017 12-Aug-2017 10:30 AM 14-Aug-2017 A Approved Closed
Cluster 7, B2

Compaction test of Sand Filling Above the pipe trench and laying
warning tape Storm Maine Line Dia 400mm Zone 1B, Line 13 Approved w/
1478 KHEP-CI-1478
, MH-I39-L13 to MH-I40-L13 and MH-I40-L13 to MH-I41-L13 and
Line 13 Zone 1B Division 31 12-Aug-2017 13-Aug-2017 11:00 AM 14-Aug-2017 B comments
Closed
MH-I41-L13 to MH-I42-L13 and MH-I42-L13 to MH-45-L13

Compaction test of Sand Filling Above the pipe trench and laying
Approved w/
1479 KHEP-CI-1479 warning tape Storm Maine Line Dia 400mm Zone 1B, Line 16 Line 16 Zone 1B Division 31 12-Aug-2017 13-Aug-2017 10:30 AM 14-Aug-2017 B comments
Closed
, MH-I53-L16 to MH-54-L15
Compaction test of sand bedding under pipe trench - Storm main
line Dia 800mm Zone Approved w/
1480 KHEP-CI-1480
4B, Line 27, MH-114-L27 to MH-115-L27 and MH-115-L27 to MH-
Line 27 Zone 4B Division 31 12-Aug-2017 13-Aug-2017 10:30 AM 14-Aug-2017 B comments
Closed
116-L27 and MH-116-L27 to MH-117-L27
Compaction test of sand bedding under pipe trench - Storm main
line Dia 800mm Zone Approved w/
1481 KHEP-CI-1481
4B, Line 26, MH-117-L27 to MH-118-L26 and MH-118-L26 to MH-
Line 26 Zone 4B Division 31 12-Aug-2017 13-Aug-2017 10:30 AM 14-Aug-2017 B comments
Closed
119-L26 and MH-119-L26 to MH-120-L26
Back filling General Fill final Layer for pipe trench - Storm Maine line
1482 KHEP-CI-1482 Dia 400mm Line 10 Zone 1B Division 31 12-Aug-2017 13-Aug-2017 10:00 AM 14-Aug-2017 A Approved Closed
Zone 1B, Line 10, MH-I31-L10 to MH-32-L10
Back filling General Fill final Layer for pipe trench - Storm Maine line
Dia 400mm
1483 KHEP-CI-1483
Zone 1B, Line 11, MH-I33-L11 to MH-I34-L11 and MH-I34-L11 to
Line 11 Zone 1B Division 31 12-Aug-2017 13-Aug-2017 10:00 AM 14-Aug-2017 A Approved Closed
MH-37-L11
Second Coat, Damp Proofing Installation Inspection for CMU, Mortar
and Masonry Inspection Under Exterior Reinforced Grad beam
1484 KHEP-CI-1484 Cluster 73, B2 NA Division 07 12-Aug-2017 13-Aug-2017 10:00 AM 14-Aug-2017 A Approved Closed
Cluster 73, B2
Second Coat, Damp Proofing Installation Inspection for CMU, Mortar
and Masonry Inspection Under Exterior Reinforced Grad beam
1485 KHEP-CI-1485 Cluster 19 B2 NA Division 07 12-Aug-2017 13-Aug-2017 10:00 AM 14-Aug-2017 A Approved Closed
Cluster 19, B2
First Coat, Damp Proofing Installation Inspection for CMU, Mortar
and Masonry Inspection Under Exterior Reinforced Grad beam Cluster 6,
1486 KHEP-CI-1486
BC4
NA Division 07 12-Aug-2017 13-Aug-2017 11:00 AM 14-Aug-2017 A Approved Closed
Cluster 6, BC4
First Coat, Damp Proofing Installation Inspection for CMU, Mortar
and Masonry Inspection Under Exterior Reinforced Grad beam
1487 KHEP-CI-1487 Cluster 8, B2 NA Division 07 12-Aug-2017 13-Aug-2017 11:00 AM 14-Aug-2017 A Approved Closed
Cluster 8, B2
Cast in place concrete Form work inspection for RC Column (First
1488 KHEP-CI-1488 Floor) Axis (B2,B3,D2,D3,A6,E6,A3,E3) Cluster 15 B2 NA Division 03 12-Aug-2017 13-Aug-2017 2:00 PM 14-Aug-2017 A Approved Closed
Cluster 15, B2
Cast in place concrete Form work inspection for RC Column (First
1489 KHEP-CI-1489 Floor) Axis (G2,J1,L2,N4) Cluster 02 A6 NA Division 03 12-Aug-2017 13-Aug-2017 3:00 PM 15-Aug-2017 A Approved Closed
Cluster 2, A6
Termite control surface preparation, installation and final inspection
1490 KHEP-CI-1490 for Footing Cluster 56, B2 NA Division 03 12-Aug-2017 13-Aug-2017 3:00 PM 14-Aug-2017 A Approved Closed
Cluster 56, B2
Blinding concrete sampling, Testing & placement inspection for
Cluster 56,
1491 KHEP-CI-1491 Footing Cluster
BC4
NA Division 03 12-Aug-2017 13-Aug-2017 3:00 PM 15-Aug-2017 A Approved Closed
56, BC4
Cast in place concrete Form work inspection for RC First Floor Slab &
1492 KHEP-CI-1492 Stair Cluster 14 B2 NA Division 03 12-Aug-2017 13-Aug-2017 2:00 PM 14-Aug-2017 A Approved Closed
Cluster 14, B2
Installation of reinforcing steel bar, Embedded item and form closure
1493 KHEP-CI-1493 inspection for RC First Floor Slab & Stair Cluster 14 B2 NA Division 03 12-Aug-2017 13-Aug-2017 2:00 PM 14-Aug-2017 A Approved Closed
Cluster 14, B2
Installation of reinforcing steel bar, Embedded item and form closure
inspection for RC Column (Ground Floor) Excluding
1494 KHEP-CI-1494
(B2,B3,C2,D2,D3,F2,F3,G2,H2,H3,K2,K3,L2,M2,M3)
Cluster 3, A6 NA Division 03 13-Aug-2017 14-Aug-2017 2:00 PM 16-Aug-2017 A Approved Closed
Cluster 3, A6
Installation of reinforcing steel bar, Embedded item and form closure
inspection for RC Column (Ground Floor) Excluding
1495 KHEP-CI-1495
(B2,B3,D2,D3,A6,E6,A3,E3)
Cluster 5, B2 NA Division 03 13-Aug-2017 14-Aug-2017 2:00 PM 16-Aug-2017 A Approved Closed
Cluster 5, B2
Second Coat, Damp Proofing Installation Inspection for RC footing &
Cluster 21,
1496 KHEP-CI-1496 Column Neck
BC4
NA Division 07 13-Aug-2017 14-Aug-2017 10:00 AM 15-Aug-2017 A Approved Closed
Cluster 21, BC4
Inspection of excavated and Compaction formation for Pipe trench
Storm Maine line Dia 400mm Zone
1497 KHEP-CI-1497 2B, Line 4 & 5, MH-I10-L04 to MH-I12-L04 and MH-I12-L04 to MH- Line 4 & 5 Zone 2B Division 31 13-Aug-2017 14-Aug-2017 11:30 AM 16-Aug-2017 A Approved Closed
I13-L04 and MH-I13-L04 to MH-15-L04 and MH-I12-L04 to MH-I11-
L05

Compaction test of sand bedding under pipe trench - Sewer main


line Dia 200mm
Approved w/
1498 KHEP-CI-1498 Zone 3B, Line 16 & 15, MH-4-L16 to MH-3-L16 and MH-3-L16 to Line 16 & 15 Zone 3B, Division 31 13-Aug-2017 14-Aug-2017 3:00 PM 15-Aug-2017 B comments
Closed
MH-3a-L16 and MH-3a-L16 to MH-2-L16 and MH-2-L16 to MH-1-L16
and MH-1-L16 to MH-16-L01 and MH-1-L15 to MH-2-L16

Inspection of Sand filling around the Pipe Storm Maine Line Dia
Approved w/
1499 KHEP-CI-1499 800mm Line 26 Zone 4B Division 31 13-Aug-2017 14-Aug-2017 3:00 PM 15-Aug-2017 B comments
Closed
Zone 4B, Line 26, MH-125-L26 to MH-126-L26
Inspection of Sand filling around the Pipe Sewer Maine Line Dia
200mm
Approved w/
1500 KHEP-CI-1500 Zone 3B, Line 23 & 24, MH-2-L23 to MH-1-L23 and MH-1-L23 Line 23 & 24 Zone 3B Division 31 13-Aug-2017 14-Aug-2017 11:15 AM 15-Aug-2017 B comments
Closed
to MH-1a-L23 and MH-1a-L23 to MH-17-L02 and MH-1-L24 to MH-
1a-L24 and MH-1a-L24 to MH-1-L23
Termite control surface preparation, installation and final inspection
Cluster 36,
1501 KHEP-CI-1501 for Footing
BC4
NA Division 03 13-Aug-2017 14-Aug-2017 3:00 PM 16-Aug-2017 A Approved Closed
Cluster 36, BC4
Blinding concrete sampling, Testing & placement inspection for
Cluster 36,
1502 KHEP-CI-1502 Footing
BC4
NA Division 03 13-Aug-2017 14-Aug-2017 3:00 PM 15-Aug-2017 A Approved Closed
Cluster 36, BC4
Termite control surface preparation, installation and final inspection
Cluster 37,
1503 KHEP-CI-1503 for Footing
BC4
NA Division 03 13-Aug-2017 14-Aug-2017 3:00 PM 16-Aug-2017 A Approved Closed
Cluster 37, BC4
Blinding concrete sampling, Testing & placement inspection for
Cluster 37,
1504 KHEP-CI-1504 Footing
BC4
NA Division 03 13-Aug-2017 14-Aug-2017 3:00 PM 15-Aug-2017 A Approved Closed
Cluster 37, BC4
First Coat, Damp Proofing Installation Inspection for CMU, Mortar
and Masonry Inspection Under Exterior Reinforced Grad beam
1505 KHEP-CI-1505 Cluster 20 B2 NA Division 07 14-Aug-2017 15-Aug-2017 11:00 AM 16-Aug-2017 A Approved Closed
Cluster 20, B2
Cast in place concrete Form work inspection for RC Column Neck
Cluster 18
1506 KHEP-CI-1506
BC4
NA Division 03 14-Aug-2017 15-Aug-2017 3:00 PM 16-Aug-2017 A Approved Closed
Cluster 18, BC4
70 cm, CMU,morter and masonry inspection under exterior reinforced
Cluster 43,
1507 KHEP-CI-1507 Grad Beam Cluster
A6
NA Division 04 14-Aug-2017 15-Aug-2017 3:00 PM 15-Aug-2017 A Approved Closed
43, A6
Cast in place concrete Form work inspection for RC Column (First
Floor) Excluding Axis (B2,B3,D2,D3,A6,E6,A3,E3)
1508 KHEP-CI-1508
Cluster 13,
Cluster 13 B2 NA Division 03 14-Aug-2017 15-Aug-2017 3:00 PM 16-Aug-2017 A Approved Closed
B2
Compaction test last and final layer General fill (Around footing)
Cluster 16
1509 KHEP-CI-1509
BC4
Zone 1B Division 31 14-Aug-2017 15-Aug-2017 11:00 AM 17-Aug-2017 A Approved Closed
Zone 1B, Cluster 16, BC4
Compaction test last and final layer General fill (Around footing)
Cluster 75,
1510 KHEP-CI-1510
BC4
Zone 4B Division 31 14-Aug-2017 15-Aug-2017 11:15 AM 17-Aug-2017 A Approved Closed
Zone 4B, Cluster 75, BC4
Inspection of Sand filling around the Pipe Storm Maine Line Dia
Approved w/
1511 KHEP-CI-1511 500mm Line 18 Zone 2B Division 31 14-Aug-2017 15-Aug-2017 11:10 AM 17-Aug-2017 B comments
Closed
Zone 2B, Line 18, MH-61-L18 to MH-62-L18
Inspection of Reinforcement steel bar for storm Manholes Storm
1512 KHEP-CI-1512 main line Line 8 Zone 1B Division 31 14-Aug-2017 15-Aug-2017 10:00 AM 17-Aug-2017 A Approved Closed
Zone 1B, Line 8, MH-21-L08 M.H.Dia 1200
Second Coat, Damp Proofing Installation Inspection for CMU, Mortar
and Masonry Inspection Under Exterior Reinforced Grad beam Cluster 6,
1513 KHEP-CI-1513
BC4
NA Division 07 14-Aug-2017 15-Aug-2017 10:00 AM 15-Aug-2017 A Approved Closed
Cluster 6, BC4
Second Coat, Damp Proofing Installation Inspection for CMU, Mortar
and Masonry Inspection Under Exterior Reinforced Grad beam
1514 KHEP-CI-1514 Cluster 8, B2 NA Division 07 14-Aug-2017 15-Aug-2017 10:30 AM 16-Aug-2017 A Approved Closed
Cluster 8, B2
Concrete sampling , testing and placement inspection for RC Column
Approved w/
1515 KHEP-CI-1515 (Ground floor) Cluster 17 B2 NA Division 03 15-Aug-2017 16-Aug-2017 9:00 AM 17-Aug-2017 B comments
Closed
Cluster 17, B2
Concrete sampling , testing and placement inspection for RC Column
Approved w/
1516 KHEP-CI-1516 (First floor) Cluster 15 B2 NA Division 03 15-Aug-2017 16-Aug-2017 9:00 AM 17-Aug-2017 B comments
Closed
Cluster 15, B2
Concrete sampling , testing and placement inspection for RC Column
Cluster 23,
1517 KHEP-CI-1517 Neck
BC4
NA Division 03 15-Aug-2017 16-Aug-2017 9:00 AM 17-Aug-2017 E Rejected Closed
Cluster 23, BC4
Concrete sampling , testing and placement inspection for RC Column
Cluster 23,
1517.1 KHEP-CI-1517-01 Neck
BC4
NA Division 03 23-Aug-2017 24-Aug-2017 9:00 AM 26-Aug-2017 A Approved Closed
Cluster 23, BC4
Concrete sampling , testing and placement inspection for RC First
Approved w/
1518 KHEP-CI-1518 Floor Slab Cluster 14 B2 NA Division 03 15-Aug-2017 16-Aug-2017 9:00 AM 17-Aug-2017 B comments
Closed
Cluster 14, B2
Concrete sampling , testing and placement inspection for RC Grade
Approved w/
1519 KHEP-CI-1519 Beam Cluster 7, B2 NA Division 03 15-Aug-2017 16-Aug-2017 9:00 AM 17-Aug-2017 B comments
Closed
Cluster 7, B2
Concrete sampling , testing and placement inspection for RC Stair
Approved w/
1520 KHEP-CI-1520 First Flight Cluster 11 B2 NA Division 03 15-Aug-2017 16-Aug-2017 9:00 AM 17-Aug-2017 B comments
Closed
Cluster 11, B2
Termite control surface preparation, installation and final inspection
Cluster 16
1521 KHEP-CI-1521 for Grade Beam
BC4
NA Division 03 15-Aug-2017 16-Aug-2017 3:00 PM 19-Aug-2017 A Approved Closed
Cluster 16, BC4
Blinding concrete sampling, Testing & placement inspection for
Cluster 16 Approved w/
1522 KHEP-CI-1522 Grade Beam
BC4
NA Division 03 15-Aug-2017 16-Aug-2017 3:00 PM 19-Aug-2017 B comments
Closed
Cluster 16, BC4
Termite control surface preparation, installation and final inspection
Cluster 25,
1523 KHEP-CI-1523 for Footing
BC4
NA Division 03 15-Aug-2017 16-Aug-2017 3:00 PM 19-Aug-2017 A Approved Closed
Cluster 25, BC4
Blinding concrete sampling, Testing & placement inspection for
Cluster 25, Approved w/
1524 KHEP-CI-1524 Footing
BC4
NA Division 03 15-Aug-2017 16-Aug-2017 3:00 PM 19-Aug-2017 B comments
Closed
Cluster 25, BC4
Cast in place concrete Form work inspection for RC Footing
Cluster 60,
1525 KHEP-CI-1525
BC4
NA Division 03 15-Aug-2017 16-Aug-2017 10:00 AM 19-Aug-2017 A Approved Closed
Cluster 60, BC4
Installation of reinforcing steel bar, Embedded item and form closure
Cluster 60,
1526 KHEP-CI-1526 inspection for RC Footing Cluster 60,
BC4
NA Division 03 15-Aug-2017 16-Aug-2017 10:30 AM 19-Aug-2017 A Approved Closed
BC4
Cast in place concrete Form work inspection for RC Column (Ground
1527 KHEP-CI-1527 Floor) Excluding Axis (B2,B3,D2,D3,A6,E6,A3,E3) Cluster 5, B2 NA Division 03 15-Aug-2017 16-Aug-2017 3:00 PM 19-Aug-2017 A Approved Closed
Cluster 5, B2
Inspection of Reinforcement steel bar and internal Shutter for
manholes (Precast yard)
1528 KHEP-CI-1528
Zone 1B, Line 15 &14, MH-46-L15 and MH-47-L15 and MH-48-L15
Line 15 &14 Zone 1B Division 31 15-Aug-2017 16-Aug-2017 10:00 AM 17-Aug-2017 A Approved Closed
and MH-43-L14
Compaction test of sand bedding under pipe trench - Sewer main
line Dia 400mm
Approved w/
1529 KHEP-CI-1529 Zone 2B, Line 4 & 5, MH-I10-L04 to MH-I12-L04 and MH-I12-L04 to Line 4 & 5 Zone 2B Division 31 15-Aug-2017 16-Aug-2017 11:30 AM 17-Aug-2017 B comments
Closed
MH-I13-L04 and MH-I3a-L04 to MH-15-L04 and MH-I12-L04 to MH-
I11-L05

Compaction test of Sand Filling Above the pipe trench and laying
warning tape Sewer Maine Line Dia 200mm Zone 2B,
Approved w/
1530 KHEP-CI-1530 Line 1 , MH-14-L01 to MH-13-L01 and MH-13-L01 to MH-12-L01 and Line 1 Zone 2B Division 31 15-Aug-2017 16-Aug-2017 3:00 PM 17-Aug-2017 B comments
Closed
MH-12-L01 to MH-11-L01 and MH-11-L01 to MH-10-L01 and MH-10-
L01 to MH-9-L01 and MH-9-L01 to MH-8-L01

Compaction test Around footing sand material final layer Zone


1531 KHEP-CI-1531
4B, Cluster 69, (Mockup)
Cluster 69 Zone 4B Division 31 15-Aug-2017 16-Aug-2017 10:30 AM 23-Aug-2017 E Rejected Closed

Compaction test 2nd and final layer General fill (Bottom of


Cluster 41,
1532 KHEP-CI-1532 Foundation)
BC4
Zone 2B Division 31 16-Aug-2017 17-Aug-2017 10:30 AM 19-Aug-2017 A Approved Closed
Zone 2B, Cluster 41, BC4

Second Coat, Damp Proofing Installation Inspection for CMU, Mortar


1533 KHEP-CI-1533 and Masonry Inspection Under Exterior Reinforced Grad beam Cluster 20 B2 NA Division 07 16-Aug-2017 17-Aug-2017 11:00 AM 19-Aug-2017 A Approved Closed
Cluster 20, B2

Cast in place concrete Form work inspection for RC Column (First


1534 KHEP-CI-1534
Floor) Axis (B2,B3,D2,D3,A6,E6,A3,E3) Cluster 13, B2
Cluster 13 B2 NA Division 03 16-Aug-2017 17-Aug-2017 11:00 AM 19-Jul-2017 E Rejected Closed

Cast in place concrete Form work inspection for RC Column (First


1534.1 KHEP-CI-1534-01
Floor) Axis (B2,B3,D2,D3,A6,E6,A3,E3) Cluster 13, B2
Cluster 13 B2 NA Division 03 20-Aug-2017 21-008-2017 11:00 AM 22-Aug-2017 A Approved Closed

Installation of reinforcing steel bar, Embedded item and form closure


1535 KHEP-CI-1535
inspection for RC Column First Floor Cluster 14, B2
Cluster 14 B2 NA Division 03 16-Aug-2017 17-Aug-2017 3:00 PM 19-Aug-2017 A Approved Closed

Installation of reinforcing steel bar, Embedded item and form closure


inspection for RC Stair (First Flight)- Ground Floor
1536 KHEP-CI-1536
Cluster 10,
Cluster 10 B2 NA Division 03 16-Aug-2017 17-Aug-2017 10:00 AM 19-Aug-2017 A Approved Closed
B2
Cast in place concrete Form work inspection for RC Stair (First
1537 KHEP-CI-1537 Flight)- Ground Floor Cluster 10 B2 NA Division 03 16-Aug-2017 17-Aug-2017 2:00 PM 19-Aug-2017 A Approved Closed
Cluster 10, B2

Cast in place concrete Form work inspection for RC Column (Ground


Cluster 3, Approved w/
1538 KHEP-CI-1538 Floor) Axis (A2,A3,B1,B4,B5,B6,C3,C4,D1,D4,D5,D6,E2,E3)
A6
NA Division 03 16-Aug-2017 17-Aug-2017 11:00 AM 19-Aug-2017 B comments
Closed
Cluster 3, A6

Inspection of Sand Filling Around pipe Sewer Maine Line Dia 200mm

Zone 3B, Line 26 & 25 , MH-4-L26 to MH-3-L26 and MH-3-L26 Approved w/


1539 KHEP-CI-1539
to MH-2-L26 and MH-2-L26 to MH-1-L26 and MH-1-L26 to MH-1A-
Line 26 & 25 Zone 3B Division 31 16-Aug-2017 17-Aug-2017 11:15 AM 19-Aug-2017 B comments
Closed
L26 and MH-1a-L26 to MH-15-L02 and MH-1-L25 to MH-1a-L25 and
MH-1La-L25 to MH-1-L26
Compaction test of Sand Filling Above the pipe trench and laying
Approved w/
1540 KHEP-CI-1540 warning tape Storm Maine Line Dia 800mm Zone 4B, Line 26 Zone 4B Division 31 16-Aug-2017 17-Aug-2017 11:00 AM 19-Aug-2017 B comments
Closed
Line 26 , MH-125-L26 to MH-126-L26
Inspection of excavated and Compaction formation for Pipe trench
Sewer Maine line Dia 200mm Zone 3B,
Approved w/
1541 KHEP-CI-1541 Line 13 & 14, MH-2-L13 to MH-1-L13 and MH-1-L13 to MH-1a-L13 Line 13 & 14 Zone 3B Division 31 16-Aug-2017 17-Aug-2017 10:30 AM 19-Aug-2017 B comments
Closed
and MH-1a-L13 to MH-14-L01 and MH-2-L14 to MH-1-L14 and MH-
1-L14 to MH-1a-L14 and MH-1a-L14 to MH-1-L13

Inspection Form work for base & wall and concrete pouring for Storm
Manholes (Precast yard)
1542 KHEP-CI-1542
Zone 1B, Line 15 & 14, MH-46-L15 and MH-47-L15 and MH-48-L15
Line 15 & 14 Zone 1B Division 31 16-Aug-2017 17-Aug-2017 3:00 PM 19-Aug-2017 A Approved Closed
and MH-43-L14
Inspection Form work for base & wall and concrete pouring for Storm
1543 KHEP-CI-1543 Manholes (In Site) Zone Line 18 Zone 1B Division 31 16-Aug-2017 17-Aug-2017 3:00 PM 19-Jul-2017 E Rejected Closed
1B, Line 18, MH-21-L08 M.H Dia 1200
Inspection Form work for base & wall and concrete pouring for Storm
1543.1 KHEP-CI-1543-01 Manholes (In Site) Zone Line 18 Zone 1B Division 31 20-Aug-2017 21-Aug-2017 10:00 AM 22-Aug-2017 A Approved Closed
1B, Line 18, MH-21-L08 M.H Dia 1200
Termite control surface preparation, installation and final inspection
1544 KHEP-CI-1544 for Grade Beam Cluster 75, B2 NA Division 03 17-Aug-2017 19-Aug-2017 10:00 AM 23-Aug-2017 A Approved Closed
Cluster 75, B2
Blinding concrete sampling, Testing & placement inspection for
1545 KHEP-CI-1545 Grade Beam Cluster 75, B2 NA Division 03 17-Aug-2017 19-Aug-2017 10:30 AM 24-Aug-2017 A Approved Closed
Cluster 75, B2
Termite control surface preparation, installation and final inspection
1546 KHEP-CI-1546 for Grade Beam Cluster 71, B2 NA Division 03 17-Aug-2017 19-Aug-2017 10:00 AM 23-Aug-2017 A Approved Closed
Cluster 71, B2
Blinding concrete sampling, Testing & placement inspection for
1547 KHEP-CI-1547 Grade Beam Cluster 71, B2 NA Division 03 17-Aug-2017 19-Aug-2017 10:30 AM 24-Aug-2017 A Approved Closed
Cluster 71, B2
70 cm, CMU,morter and masonry inspection under exterior reinforced
1548 KHEP-CI-1548 Grad Beam Cluster Cluster 72, B2 NA Division 04 17-Aug-2017 19-Aug-2017 11:00 AM 19-Aug-2017 A Approved Closed
72, B2
Concrete sampling , testing and placement inspection for RC Column
1549 KHEP-CI-1549 (First Floor) Cluster 02 A6 NA Division 03 17-Aug-2017 19-Aug-2017 9:00 AM 19-Aug-2017 A Approved Closed
Cluster 2, A6
Concrete sampling , testing and placement inspection for RC Column
Cluster 18
1550 KHEP-CI-1550 Neck
BC4
NA Division 03 17-Aug-2017 19-Aug-2017 9:00 AM 19-Aug-2017 A Approved Closed
Cluster 18, BC4
Compaction test Excavated formation level of Foundation Zone 4B, Cluster 74,
1551 KHEP-CI-1551
Cluster 74, BC4 BC4
Zone 4B Division 31 17-Aug-2017 19-Aug-2017 11:15 AM 21-Aug-2017 A Approved Closed

Compaction test 1st and final layer Structural fill (Selected fill) Cluster 42,
1552 KHEP-CI-1552
Zone 2B, Cluster 42, BC4 BC4
Zone 2B Division 31 17-Aug-2017 19-Aug-2017 11:30 AM 21-Aug-2017 A Approved Closed

Compaction test final layer General fill


1553 KHEP-CI-1553
Zone 4B, Cluster 71, B2
Cluster 71, B2 Zone 4B Division 31 17-Aug-2017 19-Aug-2017 11:30 AM 20-Aug-2017 A Approved Closed

Installation of reinforcing steel bar, Embedded item and form closure


1554 KHEP-CI-1554 inspection for RCColumn (Ground Floor) Cluster 7, Cluster 7, B2 NA Division 03 17-Aug-2017 19-Aug-2017 3:00 PM 21-Aug-2017 A Approved Closed
B2
70 cm, CMU,morter and masonry inspection under exterior reinforced
1555 KHEP-CI-1555 Grad Beam Cluster Cluster 61, B2 NA Division 04 17-Aug-2017 19-Aug-2017 3:00 PM 19-Aug-2017 A Approved Closed
61, B2
Installation of reinforcing steel bar, Embedded item and form closure
inspection for RCColumn (Ground Floor) Axis
1556 KHEP-CI-1556
(B2,B3,D2,D3,A6,E6,A3,E3)
Cluster 5, B2 NA Division 03 17-Aug-2017 19-Aug-2017 10:00 AM 21-Aug-2017 A Approved Closed
Cluster 5, B2
Installation of reinforcing steel bar, Embedded item and form closure
inspection for RCColumn (Ground Floor) Axis
1557 KHEP-CI-1557
(B2,B3,D2,D3,A6,E6,A3,E3)
Cluster 13 B2 NA Division 03 17-Aug-2017 19-Aug-2017 10:00 AM 21-Aug-2017 A Approved Closed
Cluster 13, B2
Cast in place concrete Form work inspection for RC First Floor slab
1558 KHEP-CI-1558 Cluster 12 B2 NA Division 03 19-Aug-2017 20-Aug-2017 10:00 AM 22-Aug-2017 A Approved Closed
Cluster 12, B2
Installation of reinforcing steel bar, Embedded item and form closure
1559 KHEP-CI-1559 inspection for RC First Floor slab Cluster 12 B2 NA Division 03 19-Aug-2017 20-Aug-2017 10:30 AM 23-Aug-2017 A Approved Closed
Cluster 12, B2
Cast in place concrete Form work inspection for RC Footing Cluster Cluster 22,
1560 KHEP-CI-1560
22, BC4 BC4
NA Division 03 19-Aug-2017 20-Aug-2017 10:00 AM 21-Aug-2017 A Approved Closed
Installation of reinforcing steel bar, Embedded item and form closure
Cluster 22,
1561 KHEP-CI-1561 inspection for RC Footing
BC4
NA Division 03 19-Aug-2017 20-Aug-2017 10:30 AM 21-Aug-2017 A Approved Closed
Cluster 22, BC4
Installation of reinforcing steel bar, Embedded item and form closure
inspection for RC Column (Ground Floor) Axis
1562 KHEP-CI-1562
(B2,B3,D2,D3,F2,F3,G2,H2,H3,K2,K3,L2,M2,M3)
Cluster 3, A6 NA Division 03 19-Aug-2017 20-Aug-2017 2:30 PM 21-Aug-2017 A Approved Closed
Cluster 3, A6

Cast in place concrete Form work inspection for RC Column (Ground


1563 KHEP-CI-1563 Floor) Axis (A1,A4,A3,A4,C6,F1,F4,F5,F6,G3,G4,G5,H1,H4,H5,H6) Cluster 3, A6 NA Division 03 19-Aug-2017 20-Aug-2017 3:00 PM 23-Aug-2017 A Approved Closed
Cluster 3, A6

Compaction test of Sand Filling Above the pipe trench and laying
warning tape Sewer Maine Line Dia 200mm Zone 3B,
1564 KHEP-CI-1564 Line 26 & 25 , MH-4-L26 to MH-3-L26 and MH-3-L26 to MH-2-L26 Line 26 & 25 Zone 3B Division 31 19-Aug-2017 20-Aug-2017 11:00 AM 21-Aug-2017 A Approved Closed
and MH-1-L26 to MH-1a-L26 and MH-1a-L26 to MH-15-L02 and MH-
1-L25 to MH-1a-L25 and MH-1a-L25 to MH-1-L26

Inspection of Reinforcement steel bar for Storm inlet Manholes Storm


main line Zone 1B & Line 21 &11
1565 KHEP-CI-1565
2B, Line 21 &11 & 13, MH-I80-L21 and MH-I81-L21 and MH-I34-L11 & 13
Zone 1B & 2B Division 31 19-Aug-2017 20-Aug-2017 10:00 AM 22-Aug-2017 A Approved Closed
and MH-I41-L13 (Square)
Compaction test final layer General fill Around Foundations
Cluster 81,
1566 KHEP-CI-1566
A6
Zone 4A Division 31 20-Aug-2017 21-Aug-2017 11:30 AM 22-Aug-2017 A Approved Closed
Zone 4A, Cluster
Compaction 81,layer
test final A6 General fill Around Foundations
1567 KHEP-CI-1567 Cluster 73, B2 Zone 4B Division 31 20-Aug-2017 21-Aug-2017 11:30 AM 22-Aug-2017 A Approved Closed
Zone 4B, Cluster 73, B2
Compaction test of Sand Filling Above the pipe trench and laying
Approved w/
1568 KHEP-CI-1568 warning tape Storm Maine Line Dia 500mm Zone 2B, Line 18 Zone 2B Division 31 20-Aug-2017 21-Aug-2017 11:00 AM 22-Aug-2017 B comments
Closed
Line 18 , MH-61-L18 to MH-62-L18
Inspection of Sand Filling Around pipe Storm Maine Line Dia 800mm
1569 KHEP-CI-1569
Zone 4B, Line 27 , MH-114-L27 to MH-115-L27 and MH-115-L27
Line 27 Zone 4B Division 31 20-Aug-2017 21-Aug-2017 11:00 AM 22-Aug-2017 A Approved Closed
to MH-116-L27 and MH-116-L27 to MH-117-L27
Inspection of Sand Filling Around pipe Storm Maine Line Dia 800mm
Approved w/
1570 KHEP-CI-1570
Zone 4B, Line 26 , MH-117-L27 to MH-118-L26 and MH-118-L26
Line 26 Zone 4B Division 31 20-Aug-2017 21-Aug-2017 11:00 AM 22-Aug-2017 B comments
Closed
to MH-119-L26 and MH-119-L26 to MH-120-L26
Compaction test of Sand Filling Above the pipe trench and laying
warning tape Sewer Maine Line Dia 200mm Zone 3B,
Approved w/
1571 KHEP-CI-1571 Line 23 & 24 , MH-2-L23 to MH-1-L23 and MH-1-L23 to MH-1a-L23 Line 23 & 24 Zone 3B Division 31 20-Aug-2017 21-Aug-2017 10:00 AM 22-Aug-2017 B comments
Closed
and MH-1a-L23 to MH-17-L02 and MH-1-L24 to MH-1a-L24 and MH-
1a-L23 to MH-1-L23

Compaction test of sand bedding under pipe trench - Sewer main


line Dia 200mm
1572 KHEP-CI-1572 Zone 3B, Line 14 & 13, MH-2-L14 to MH-1-L14 and MH-1-L14 to Line 14 & 13 Zone 3B Division 31 20-Aug-2017 21-Aug-2017 10:00 AM 22-Aug-2017 A Approved Closed
MH-1a-L14 and MH-1a-L14 to MH-1-L13 and MH-2-L13 to MH-1-L13
and MH-1-L13 to MH-1a-L13 and MH-1a-L13 to MH-14-L01

Concrete sampling , testing and placement inspection for RC Column


Approved w/
1573 KHEP-CI-1573 (First Floor) Cluster 13 B2 NA Division 03 20-Aug-2017 21-Aug-2017 9:00 AM 22-Aug-2017 B comments
Closed
Cluster 13, B2
Cast in place concrete Form work inspection for RC Column (First
1574 KHEP-CI-1574 Floor) Cluster 14 B2 NA Division 03 20-Aug-2017 21-Aug-2017 3:00 PM 23-Aug-2017 A Approved Closed
Cluster 14, B2
Cast in place concrete Form work inspection for RC Column (Ground
1575 KHEP-CI-1575 Floor) Axis (B2,B3,D2,D3,A6,E6,A3,E3) Cluster 5, Cluster 5, B2 NA Division 03 20-Aug-2017 21-Aug-2017 10:30 AM 22-Aug-2017 A Approved Closed
B2
Concrete sampling , testing and placement inspection for RC Stair
Approved w/
1576 KHEP-CI-1576 first flight Cluster 10 B2 NA Division 03 20-Aug-2017 21-Aug-2017 9:00 AM 22-Aug-2017 B comments
Closed
Cluster 10, B2
Compaction test Excavated formation level of Foundation Zone 2B, Cluster 40,
1577 KHEP-CI-1577
Cluster 40, BC4 BC4
Zone 2B Division 31 21-Aug-2017 22-Aug-2017 3:30 PM 24-Aug-2017 A Approved Closed

Compaction test 1st and final layer Structural fill (Selected fill) Zone Cluster
1578 KHEP-CI-1578
2B, Cluster 41,BC4 41,BC4
Zone 2B Division 31 21-Aug-2017 22-Aug-2017 10:30 AM 24-Aug-2017 A Approved Closed

Inspection of excavated and Compaction formation for Pipe trench


Approved w/
1579 KHEP-CI-1579 Storm Maine line Dia 400mm Zone Line 2 Zone 2B Division 31 21-Aug-2017 22-Aug-2017 10:30 AM 23-Aug-2017 B comments
Closed
2B, Line 2, MH-I4-L02 to MH-I5-L02 and MH-I5-L02 to MH-6-L01
Inspection of Sand Filling Around pipe Storm Maine Line Dia 400mm
Approved w/
1580 KHEP-CI-1580
Zone 2B, Line 4 & 5 , MH-I10-L04 to MH-I12-L04 and MH-I12-
Line 4 & 5 Zone 2B Division 31 21-Aug-2017 22-Aug-2017 10:00 AM 23-Aug-2017 B comments
Closed
L04 to MH-I3-L04 and MH-I11-L05 to MH-I12-L04
Compaction test 1st and final layer Structural fill (Selected fill) Cluster
1581 KHEP-CI-1581
Zone 4B, Cluster 74,BC4 74,BC4
Zone 4B Division 31 21-Aug-2017 22-Aug-2017 11:00 AM 24-Aug-2017 A Approved Closed

Installation of reinforcing steel bar and Internal shutter for Storm


manholes (Precast Yard)
1582 KHEP-CI-1582
Zone 2B & 4B, Line 7 & 22 , MH-I9-L07 and MH-20-L07 and MH-83-
Line 7 & 22 Zone 2B & 4B Division 31 21-Aug-2017 22-Aug-2017 3:00 PM 24-Aug-2017 A Approved Closed
L22 and MH-84-L22 and MH-87-L22
Cast in place concrete Form work inspection for RC Column (Ground
Floor) Axis (B2,B3,C2 Approved w/
1583 KHEP-CI-1583
C5,D2,D3,F2,F3,J2,J3,K4,K5,K6,L3,L4,L5,M4,M5,M6,N2,N3)
Cluster 3, A6 NA Division 03 21-Aug-2017 22-Aug-2017 3:00 PM 24-Aug-2017 B comments
Closed
Cluster 3, A6
70 cm, CMU,mortar and masonry inspection under exterior reinforced
Cluster 45,
1584 KHEP-CI-1584 Grad Beam Cluster
A6
NA Division 04 21-Aug-2017 22-Aug-2017 11:00 AM 27-Aug-2017 A Approved Closed
45, A6
Cast in place concrete Form work inspection for RC Grade Beam
Cluster 81,
1585 KHEP-CI-1585
A6
NA Division 03 21-Aug-2017 22-Aug-2017 10:00 AM 24-Aug-2017 E Rejected Closed
Cluster 81, A6
Cast in place concrete Form work inspection for RC Grade Beam
Cluster 81,
1585.1 KHEP-CI-1585-01
A6
NA Division 03 26-Aug-2017 27-Aug-2017 10:00 AM 28-Aug-2017 A Approved Closed
Cluster 81, A6
Installation of reinforcing steel bar, Embedded item and form closure
Cluster 81,
1586 KHEP-CI-1586 inspection for RC Grade Beam Cluster 81,
A6
NA Division 03 21-Aug-2017 22-Aug-2017 11:00 AM 24-Aug-2017 E Rejected Closed
A6
Installation of reinforcing steel bar, Embedded item and form closure
Cluster 81,
1586.1 KHEP-CI-1586-01 inspection for RC Grade Beam Cluster 81,
A6
NA Division 03 27-Aug-2017 28-Aug-2017 10:00 AM 30-Aug-2017 A Approved Closed
A6
Inspection Form work for base & wall and concrete pouring for Storm
Manholes (Precast Yard) Zone Line 21 & 11
1587 KHEP-CI-1587
1B & 2B, Line 21 & 11 & 13 , MH-I80-L21 and MH-I81-L21 and MH- & 13
Zone 1B & 2B Division 31 21-Aug-2017 22-Aug-2017 3:00 PM 24-Aug-2017 A Approved Closed
I34-L11 and MH-I41-L13 (Square)
Cast in place concrete Form work inspection for RC Footing Cluster Cluster 50,
1588 KHEP-CI-1588
50, BC4 BC4
NA Division 03 21-Aug-2017 22-Aug-2017 10:00 AM 24-Aug-2017 A Approved Closed

Installation of reinforcing steel bar, Embedded item and form closure


Cluster 50,
1589 KHEP-CI-1589 inspection for RC Footing
BC4
NA Division 03 21-Aug-2017 22-Aug-2017 2:00 PM 24-Aug-2017 A Approved Closed
Cluster 50, BC4
Compaction test Around Footing General fill (Final layer) Zone
1590 KHEP-CI-1590
1B, Cluster 19, B2
Cluster 19 B2 Zone 1B Division 31 22-Aug-2017 23-Aug-2017 11:30 AM 26-Aug-2017 A Approved Closed

Compaction test Around Footing General fill (Final layer) Zone


1591 KHEP-CI-1591
1B, Cluster 20, B2
Cluster 20 B2 Zone 1B Division 31 22-Aug-2017 23-Aug-2017 11:30 AM 26-Aug-2017 A Approved Closed

Cast in place concrete Form work inspection for RC Footing Cluster Cluster 25,
1592 KHEP-CI-1592
25, BC4 BC4
NA Division 03 22-Aug-2017 23-Aug-2017 3:00 PM 24-Aug-2017 E Rejected Closed

Cast in place concrete Form work inspection for RC Footing Cluster Cluster 25,
1592.1 KHEP-CI-1592-01
25, BC4 BC4
NA Division 03 26-Aug-2017 27-Aug-2017 10:00 AM 29-Aug-2017 A Approved Closed

Installation of reinforcing steel bar, Embedded item and form closure


Cluster 25,
1593 KHEP-CI-1593 inspection for RC Footing
BC4
NA Division 03 22-Aug-2017 23-Aug-2017 3:00 PM 24-Aug-2017 E Rejected Closed
Cluster 25, BC4
Installation of reinforcing steel bar, Embedded item and form closure
Cluster 25,
1593.1 KHEP-CI-1593-01 inspection for RC Footing
BC4
NA Division 03 26-Aug-2017 27-Aug-2017 10:00 AM 29-Aug-2017 A Approved Closed
Cluster 25, BC4
Cast in place concrete Form work inspection for RC Column (Ground
Floor) Axis (J1,K1,K2,K3,L2,L6,M1,M2,M3,N1,N4,M-N/4)
1594 KHEP-CI-1594
Cluster 3,
Cluster 3, A6 NA Division 03 22-Aug-2017 23-Aug-2017 3:00 PM 24-Aug-2017 A Approved Closed
A6
Cast in place concrete Form work inspection for RC Column (Ground
Floor) Axis (JA5,B6,C1,C2,C4,C5,C6,D6,E5,B-C/4,B-C/5,C-D/4,C-D/5))
1595 KHEP-CI-1595 Cluster 7, B2 NA Division 03 22-Aug-2017 23-Aug-2017 3:00 PM 24-Aug-2017 A Approved Closed
Cluster 7, B2
Compaction test of sand bedding under pipe trench - Storm main
line Dia 400mm Approved w/
1596 KHEP-CI-1596
Zone 2B, Line 2, MH-I4-L02 to MH-I5-L02 and MH-I5-L02 to MH-I6-
Line 2 Zone 2B Division 31 22-Aug-2017 23-Aug-2017 10:00 AM 26-Aug-2017 B comments
Closed
L02
Inspection Form work for base & wall and concrete pouring for Storm
Manholes (Precast Yard) Zone Approved w/
1597 KHEP-CI-1597
2B & 4B, Line 7 & 22 , MH-I9-L07 and MH-20-L07 and MH-83-L22
Line 7 & 22 Zone 2B & 4B Division 31 22-Aug-2017 23-Aug-2017 3:00 PM 27-Aug-2017 B comments
Closed
and MH-84-L22 and MH-87-L22

Inspection of Sand Filling Around pipe Sewer Maine Line Dia 200mm
Approved w/
1598 KHEP-CI-1598 Zone 3B, Line 16 & 15 , MH-4-L16 to MH-3-L16 and MH-3-L16 Line 16 & 15 Zone 3B Division 31 23-Aug-2017 24-Aug-2017 11:00 AM 26-Aug-2017 B comments
Closed
to MH-3a-L16 and MH-3a-L16 to MH-2-L16 and MH-2-L16 to MH-1-
L16 and MH-1-L16 to MH-16-L01 and MH-1-L15 to MH-2-L16

Compaction test 1st and final layer Structural fill (Selected fill) Cluster
1599 KHEP-CI-1599
Zone 2B, Cluster 40,BC4 40,BC4
Zone 2B Division 31 23-Aug-2017 24-Aug-2017 10:30 AM 26-Aug-2017 A Approved Closed

Back filling General Fill final Layer for pipe trench - Sewer Maine line
Dia 200mm
Zone 2B, Line 27 & 28, MH-5-L27 to MH-4-L27 and MH-4-L27 to Approved w/
1600 KHEP-CI-1600
MH-3-L27 and MH-3-L27 to MH-2-L27 and MH-2-L27 to MH-1-L27
Line 27 & 28 Zone 2B Division 31 23-Aug-2017 24-Aug-2017 10:00 AM 26-Aug-2017 B comments
Closed
and MH-1-L27 to MH-13-L02 and MH-1-L26 to MH-1a-L26 and MH-
1a-L26 to MH-2-L27
Concrete sampling , testing and placement inspection for RC Footing
Cluster 60, Approved w/
1601 KHEP-CI-1601
BC4
NA Division 03 23-Aug-2017 24-Aug-2017 9:00 AM 26-Aug-2017 B comments
Closed
Cluster 60, BC4
Concrete sampling , testing and placement inspection for RC Footing
Cluster 22, Approved w/
1602 KHEP-CI-1602
BC4
NA Division 03 23-Aug-2017 24-Aug-2017 9:00 AM 26-Aug-2017 B comments
Closed
Cluster 22, BC4
Concrete sampling , testing and placement inspection for RC Column
Approved w/
1603 KHEP-CI-1603 (First Floor) Cluster 14 B2 NA Division 03 23-Aug-2017 24-Aug-2017 9:00 AM 28-Aug-2017 B comments
Closed
Cluster 14, B2
Concrete sampling , testing and placement inspection for RC First
1604 KHEP-CI-1604 Floor Slab Cluster 12 B2 NA Division 03 23-Aug-2017 24-Aug-2017 9:00 AM 26-Aug-2017 A Approved Closed
Cluster 12, B2
Concrete sampling , testing and placement inspection for RC Column
Approved w/
1605 KHEP-CI-1605 (Ground Floor) Cluster 5, B2 NA Division 03 23-Aug-2017 24-Aug-2017 9:00 AM 28-Aug-2017 B comments
Closed
Cluster 5, B2
Installation of reinforcing steel bar, Embedded item and form closure
Cluster 22,
1606 KHEP-CI-1606 inspection for RC Column Neck Cluster 22,
BC4
NA Division 03 23-Aug-2017 24-Aug-2017 3:00 PM 26-Aug-2017 A Approved Closed
BC4

Installation of reinforcing steel bar, Embedded item and form closure


1607 KHEP-CI-1607
inspection for RC Column (First Floor) Cluster 12, B2
Cluster 12 B2 NA Division 03 23-Aug-2017 24-Aug-2017 10:00 AM 26-Aug-2017 A Approved Closed

Installation of reinforcing steel bar, Embedded item and form closure


Cluster 79, Approved w/
1608 KHEP-CI-1608 inspection for RC Column Neck Cluster 79,
BC4
NA Division 03 23-Aug-2017 24-Aug-2017 3:00 PM 28-Aug-2017 B comments
Closed
BC4

Cast in place concrete Form work inspection for RC Column (Ground


1609 KHEP-CI-1609 Floor) Axis (A-B /3-4, E1,E4,D-E/3-4,E-F/3-4,G2,H2,H3,J4,J-H/3-4,J- Cluster 3, A6 NA Division 03 23-Aug-2017 24-Aug-2017 3:00 PM 27-Aug-2017 E Rejected Closed
K/3-4) Cluster 3, A6

Cast in place concrete Form work inspection for RC Column (Ground


1609.1 KHEP-CI-1609-01 Floor) Axis (A-B /3-4, E1,E4,D-E/3-4,E-F/3-4,G2,H2,H3,J4,J-H/3-4,J- Cluster 3, A6 NA Division 03 28-Aug-2017 29-Aug-2017 9:00 AM 30-Aug-2017 A Approved Closed
K/3-4) Cluster 3, A6

Inspection of excavated and Compaction formation for Pipe trench


Storm Maine line Dia 400 & 500mm Approved w/
1610 KHEP-CI-1610
Zone 2B, Line 1 & 3, MH-I7-L03 to MH-I8-L01 and MH-I8-L01 to
Line 1 & 3 Zone 2B Division 31 24-Aug-2017 26-Aug-2017 11:00 AM 27-Aug-2017 B comments
Closed
MH-9-L01
Inspection of excavated and Compaction formation for Pipe trench
Approved w/
1611 KHEP-CI-1611 Storm Maine line Dia 400mm Zone Line 36 Zone 4B Division 31 24-Aug-2017 26-Aug-2017 3:00 PM 27-Aug-2017 B comments
Closed
4B, Line 36, MH-I33-L36 to MH-I26-L26
Compaction test of Sand Filling Above the pipe trench and laying
warning tape Storm Maine Line Dia 800mm Zone 4B, Approved w/
1612 KHEP-CI-1612
Line 27 , MH-114-L27 to MH-115-L27 and MH-115-L27 to MH-116-
Line 27 Zone 4B Division 31 24-Aug-2017 26-Aug-2017 11:30 AM 27-Aug-2017 B comments
Closed
L27 and MH-116-L27 to MH-117-L27
Compaction test of Sand Filling Above the pipe trench and laying
warning tape Storm Maine Line Dia 800mm Zone 4B, Approved w/
1613 KHEP-CI-1613
Line 26 , MH-117-L27 to MH-118-L26 and MH-118-L26 to MH-119-
Line 26 Zone 4B Division 31 24-Aug-2017 26-Aug-2017 11:30 AM 27-Aug-2017 B comments
Closed
L26 and MH-119-L26 to MH-120-L26
Compaction test Around Footing General fill (Final layer) Zone Cluster 6,
1614 KHEP-CI-1614
1B, Cluster 6, BC4 BC4
Zone 1B Division 31 24-Aug-2017 26-Aug-2017 11:30 AM 27-Aug-2017 A Approved Closed
Compaction test Excavated formation level of Foundation Zone 4A, Cluster 67,
1615 KHEP-CI-1615
Cluster 67, A4 A4
Zone 4A Division 31 24-Aug-2017 26-Aug-2017 3:30 PM 28-Aug-2017 A Approved Closed

Concrete sampling , testing and placement inspection for RC Footing


Cluster 50,
1616 KHEP-CI-1616
BC4
NA Division 03 24-Aug-2017 26-Aug-2017 9:00 AM 27-Aug-2017 A Approved Closed
Cluster 50, BC4
Cast in place concrete Form work inspection for RC Column (Ground
1617 KHEP-CI-1617 Floor) Axis (A3,A6,B1,B2,B3,D1,D2,D3,E3,E6) Cluster 7, B2 NA Division 03 24-Aug-2017 26-Aug-2017 3:00 PM 29-Aug-2017 A Approved Closed
Cluster 7, B2
70 cm, CMU,mortar and masonry inspection under exterior reinforced
1618 KHEP-CI-1618 Grad Beam Cluster Cluster 58, B2 NA Division 04 24-Aug-2017 26-Aug-2017 11:00 AM 27-Aug-2017 A Approved Closed
58, B2
70 cm, CMU,mortar and masonry inspection under exterior reinforced
1619 KHEP-CI-1619 Grad Beam Cluster Cluster 48, B2 NA Division 04 24-Aug-2017 26-Aug-2017 3:00 PM 27-Aug-2017 A Approved Closed
48, B2
Installation of reinforcing steel bar, Embedded item and form closure
Cluster 28,
1620 KHEP-CI-1620 inspection for RC Column Neck Cluster 28,
BC4
NA Division 03 24-Aug-2017 26-Aug-2017 3:00 PM 27-Aug-2017 A Approved Closed
BC4
Installation of reinforcing steel bar, Embedded item and form closure
Cluster 29,
1621 KHEP-CI-1621 inspection for RC Column Neck Cluster 29,
BC4
NA Division 03 24-Aug-2017 26-Aug-2017 3:00 PM 27-Aug-2017 A Approved Closed
BC4
First Coat, Damp Proofing Installation Inspection for CMU, Mortar
and Masonry Inspection Under Exterior Reinforced Grad beam
1622 KHEP-CI-1622 Cluster 61, B2 NA Division 07 24-Aug-2017 26-Aug-2017 10:00 AM 27-Aug-2017 A Approved Closed
Cluster 61, B2
Second Coat, Damp Proofing Installation Inspection for CMU, Mortar
and Masonry Inspection Under Exterior Reinforced Grad beam
1623 KHEP-CI-1623 Cluster 61, B2 NA Division 07 26-Aug-2017 27-Aug-2017 10:00 AM 29-Aug-2017 A Approved Closed
Cluster 61, B2
Cast in place concrete Form work inspection for RC Roof slab & Stair
1624 KHEP-CI-1624 Cluster 01 A6 NA Division 03 26-Aug-2017 27-Aug-2017 10:00 AM 30-Aug-2017 E Rejected Closed
Cluster 1, A6
Cast in place concrete Form work inspection for RC Roof slab & Stair
1624.1 KHEP-CI-1624-01 Cluster 01 A6 NA Division 03 5-Sep-2017 6-Sep-2017 10:00 AM 9-Sep-2017 A Approved Closed
Cluster 1, A6
Cast in place concrete Form work inspection for RC First floor slab &
1625 KHEP-CI-1625 Stair Cluster 11 A6 NA Division 03 26-Aug-2017 27-Aug-2017 10:00 AM 30-Aug-2017 A Approved Closed
Cluster 11, A6
Cast in place concrete Form work inspection for RC First floor slab &
1626 KHEP-CI-1626 Stair Cluster 68, B2 NA Division 03 26-Aug-2017 27-Aug-2017 10:30 AM 30-Aug-2017 E Rejected Closed
Cluster 68, B2
Cast in place concrete Form work inspection for RC First floor slab &
1626.1 KHEP-CI-1626-01 Stair Cluster 68, B2 NA Division 03 7-Sep-2017 9-Sep-2017 10:30 AM 9-Sep-2017 A Approved Closed
Cluster 68, B2
70 cm, CMU,mortar and masonry inspection under exterior reinforced
Cluster 9,
1627 KHEP-CI-1627 Grad Beam Cluster
BC4
NA Division 04 26-Aug-2017 27-Aug-2017 3:00 PM 29-Aug-2017 A Approved Closed
9, BC4
Inspection of reinforcing steel bar, Internal shutter for Storm
manhole - (Precast yard) Line 9 & 13 &
1628 KHEP-CI-1628
Zone 1B & 2B, Line 9 & 13 & 16 , MH-I22-L09 and MH-I23-L09 16
Zone 1B & 2B Division 31 26-Aug-2017 27-Aug-2017 3:00 PM 28-Aug-2017 A Approved Closed
and MH-I42-L13 and MH-I53-L16
Compaction test of sand bedding under pipe trench - Storm main
line Dia 400 & 500mm Approved w/
1629 KHEP-CI-1629
Zone 2B, Line 3 & 1, MH-I7-L03 to MH-I8-L01 and MH-I8-L01
Line 3 & 1 Zone 2B Division 31 26-Aug-2017 27-Aug-2017 3:30 PM 28-Aug-2017 B comments
Closed
to MH-9-L01
Inspection of Sand Filling Around pipe Storm Maine Line Dia 400mm
Approved w/
1630 KHEP-CI-1630
Zone 2B, Line 2, MH-I4-L02 to MH-I5-L02 and MH-I5-L02 to
Line 2 Zone 2B Division 31 26-Aug-2017 27-Aug-2017 11:00 AM 28-Aug-2017 B comments
Closed
MH-6-L01
Compaction test of Sand Filling Above the pipe trench and laying
warning tape Storm Maine Line Dia 400mm Zone 2B, Approved w/
1631 KHEP-CI-1631
Line 4 & 5, MH-I10-L04 to MH-I12-L04 and MH-I12-L04 to MH-I13-
Line 4 & 5 Zone 2B Division 31 26-Aug-2017 27-Aug-2017 11:30 AM 28-Aug-2017 B comments
Closed
L04 and MH-I11-L05 to MH-I12-L04

Inspection of excavated and Compaction formation for Pipe trench


Approved w/
1632 KHEP-CI-1632 Storm Maine line Dia 400mm Zone Line 21 Zone 3B Division 31 26-Aug-2017 27-Aug-2017 10:30 AM 28-Aug-2017 B comments
Closed
3B, Line 21, MH-77-L21 to MH-78-L21 and MH-78-L21 to MH-79-L21
Compaction test of sand bedding under pipe trench - Storm main
line Dia 400mm
1633 KHEP-CI-1633
Zone 3B, Line 21, MH-77-L21 to MH-78-L21 and MH-78-L21 to MH-
Line 21 Zone 3B Division 31 27-Aug-2017 28-Aug-2017 10:30 AM 29-Aug-2017 A Approved Closed
79-L21
Compaction test of sand bedding under pipe trench - Storm main
1634 KHEP-CI-1634 line Dia 400mm Line 36 Zone 4B Division 31 27-Aug-2017 28-Aug-2017 10:30 AM 29-Aug-2017 A Approved Closed
Zone 4B, Line 36, MH-133-L36 to MH-126-L26
Inspection of excavated and Compaction formation for Pipe trench
Storm Maine line Dia 400 & 500mm
1635 KHEP-CI-1635
Zone 4B, Line 22, MH-83-L22 to MH-84-L22 and MH-84-L22 to MH-
Line 22 Zone 4B Division 31 27-Aug-2017 28-Aug-2017 11:30 AM 29-Aug-2017 A Approved Closed
87-L22 and MH-87-L22 to MH-88-L22
Inspection Form work for base & wall and concrete pouring for Storm
Manholes (Precast Yard) Zone Line 9 & 13 &
1636 KHEP-CI-1636
1B & 2B, Line 9 & 13 & 16, MH-I22-L09 and MH-I23-L09 and MH- 16
Zone 1B & 2B Division 33 27-Aug-2017 28-Aug-2017 3:00 PM 29-Aug-2017 A Approved Closed
I42-L13 and MH-I53-L16
Inspection of Reinforcement steel bar, Internal shutter for Storm
manhole - (Precast yard) Line 13 & 14
1637 KHEP-CI-1637
Zone 1B & 4B, Line 13 & 14 & 15 & 22, MH-45-L13 and MH-44- & 15 & 22
Zone 1B & 4B Division 33 27-Aug-2017 28-Aug-2017 3:00 PM 29-Aug-2017 A Approved Closed
L14 and MH-49-L15 and MH-88-L22 and MH-89-L22
Inspection of Dam proofing Surface Preparation for Storm manhole -
(Precast yard) Zone Line 10 & 11
1638 KHEP-CI-1638
1B, Line 10 & 11 & 13, MH-I31-L10 and MH-I33-L11 and MH-I39-L13 & 13
Zone 1B Division 33 27-Aug-2017 28-Aug-2017 3:00 PM 29-Aug-2017 A Approved Closed
and MH-I40-L13
Installation of reinforcing steel bar, Embedded item and form closure
Cluster 60,
1639 KHEP-CI-1639 inspection for RC Column Neck Cluster 60,
BC4
NA Division 03 27-Aug-2017 28-Aug-2017 3:00 PM 28-Aug-2017 A Approved Closed
BC4
Installation of reinforcing steel bar, Embedded item and form closure
1640 KHEP-CI-1640 inspection for RC Roof Slab & Stair Cluster 1, Cluster 01 A6 NA Division 03 27-Aug-2017 28-Aug-2017 10:00 AM 30-Aug-2017 E Rejected Closed
A6
Installation of reinforcing steel bar, Embedded item and form closure
1640.1 KHEP-CI-1640-01 inspection for RC Roof Slab & Stair Cluster 1, Cluster 01 A6 NA Division 03 5-Sep-2017 6-Sep-2017 10:00 AM 9-Sep-2017 A Approved Closed
A6
Back filling General Fill final Layer for pipe trench - Storm Maine line
Dia 400mm
1641 KHEP-CI-1641 Zone 1B, Line 13, MH-I39-L13 to MH-I40-L13 and MH-I40-L13 to Line 13 Zone 1B Division 31 28-Aug-2017 29-Aug-2017 10:00 AM 29-Aug-2017 A Approved Closed
MH-I41-L13 and MH-I41-L13 to MH-I42-L13 and MH-I42-L13 to MH-
45-L13
Back filling General Fill final Layer for pipe trench - Storm Maine line
1642 KHEP-CI-1642 Dia 400mm Line 16 Zone 1B Division 31 28-Aug-2017 29-Aug-2017 10:00 AM 29-Aug-2017 A Approved Closed
Zone 1B, Line 16, MH-I53-L16 to MH-54-L15

Compaction test of Sand Filling Above the pipe trench and laying
warning tape Sewer Maine Line Dia 200mm Zone 3B,
Approved w/
1643 KHEP-CI-1643 Line 16 & 15, MH-4-L16 to MH-3-L16 and MH-3-L16 to MH-3a-L16 Line 16 & 15 Zone 3B Division 31 28-Aug-2017 29-Aug-2017 11:30 AM 29-Aug-2017 B comments
Closed
and MH-3a-L16 to MH-2-L16 and MH-2-L16 to MH-1-L16 and MH-1-
L16 to MH-16-L01 and MH-1-L15 to MH-2-L16

Inspection of Sand Filling Around pipe Sewer Maine Line Dia 200mm

1644 KHEP-CI-1644 Zone 3B, Line 14 & 13 , MH-2-L14 to MH-1-L14 and MH-1-L14 Line 14 & 13 Zone 3B Division 31 28-Aug-2017 29-Aug-2017 11:00 AM 29-Aug-2017 E Rejected Closed
to MH-1a-L14 and MH-1a-L14 to MH-1-L13 and MH-2-L13 to MH-1-
L13 and MH-1-L13 to MH-1a-L13 and MH-1a-L13 to MH-14-L01

Inspection of Sand Filling Around pipe Sewer Maine Line Dia 200mm
Approved w/
1644.1 KHEP-CI-1644-01 Zone 3B, Line 14 & 13 , MH-2-L14 to MH-1-L14 and MH-1-L14 Line 14 & 13 Zone 3B Division 31 5-Sep-2017 6-Sep-2017 11:00 AM 7-Sep-2017 B comments
Closed
to MH-1a-L14 and MH-1a-L14 to MH-1-L13 and MH-2-L13 to MH-1-
L13 and MH-1-L13 to MH-1a-L13 and MH-1a-L13 to MH-14-L01

Compaction test 1st and final layer Structural fill (Selected fill)
1645 KHEP-CI-1645
Zone 4A, Cluster 67,A4
Cluster 67,A4 Zone 4A Division 31 28-Aug-2017 29-Aug-2017 10:30 AM 30-Aug-2017 A Approved Closed
Cast in place concrete Form work inspection for RC Footing
Cluster 36,
1646 KHEP-CI-1646
BC4
NA Division 03 28-Aug-2017 29-Aug-2017 9:30 AM 30-Aug-2017 A Approved Closed
Cluster 36, BC4
Installation of reinforcing steel bar, Embedded item and form closure
Cluster 36,
1647 KHEP-CI-1647 inspection for RC Footing
BC4
NA Division 03 28-Aug-2017 29-Aug-2017 9:30 AM 30-Aug-2017 A Approved Closed
Cluster 36, BC4
Cast in place concrete Form work inspection for RC Footing
Cluster 55,
1648 KHEP-CI-1648 Cluster
BC4
NA Division 03 28-Aug-2017 29-Aug-2017 10:00 AM 30-Aug-2017 A Approved Closed
55, BC4
Installation of reinforcing steel bar, Embedded item and form closure
Cluster 55,
1649 KHEP-CI-1649 inspection for RC Footing
BC4
NA Division 03 28-Aug-2017 29-Aug-2017 10:00 AM 30-Aug-2017 A Approved Closed
Cluster 55, BC4
Concrete sampling , testing and placement inspection for RC Grade
Cluster 81, Approved w/
1650 KHEP-CI-1650 Beam
A6
NA Division 03 28-Aug-2017 29-Aug-2017 9:00 AM 30-Aug-2017 B comments
Closed
Cluster 81, A6
Cast in place concrete Form work inspection for RC Stair Ground
Floor (First Flight)
1651 KHEP-CI-1651
Cluster 17, B2
Cluster 17 B2 NA Division 03 28-Aug-2017 29-Aug-2017 10:00 AM 30-Aug-2017 A Approved Closed

Installation of reinforcing steel bar, Embedded item and form closure


1652 KHEP-CI-1652 inspection for RC Stair Ground Floor (First Flight) Cluster 17 B2 NA Division 03 28-Aug-2017 29-Aug-2017 9:30 AM 30-Aug-2017 A Approved Closed
Cluster 17, B2
Installation of reinforcing steel bar, Embedded item and form closure
1653 KHEP-CI-1653 inspection for RC First floor Slab & Stair Cluster 11 B2 NA Division 03 28-Aug-2017 29-Aug-2017 10:00 AM 30-Aug-2017 A Approved Closed
Cluster 11, B2
Inspection of excavated and Compaction formation for Pipe trench
Sewer Maine line Dia 200mm Zone
1654 KHEP-CI-1654 4B, Line 19 & 18, MH-3-L19 to MH-2-L19 and MH-2-L19 to MH-1-L19 Line 19 & 18 Zone 4B Division 31 28-Aug-2017 29-Aug-2017 11:00 AM 30-Aug-2017 A Approved Closed
and MH-1-L19 to MH-21-L01 and MH-1-L18 to MH-1a-L18 and MH-
1a-L18 to MH-2-L19
Inspection of excavated and Compaction formation for Pipe trench
Storm Maine line Dia 400mm Zone
1655 KHEP-CI-1655
4B, Line 33, MH-I121-L33 to MH-I122-L33 and MH-I122-L33 to MH-
Line 33 Zone 4B Division 31 9-Sep-2017 10-Sep-2017 11:00 AM 11-Sep-2017 E Rejected Closed
123-L33
Inspection of excavated and compaction formation for pipe trench,
Strom main line Dia 400mm, Zone 4B,
Approved w/
1655.1 KHEP-CI-1655-01 Line 33 MH-I121-L33 Line 33 Zone 4B Division 31 12-Sep-2017 13-Sep-2017 11:00 AM 14-Sep-2017 B comments
Closed
to MH-I122-L33, MH-I122-L33 to MH-123-L33

Compaction test of sand bedding under pipe trench - Storm main


line Dia 400 & 500mm Approved w/
1656 KHEP-CI-1656
Zone 4B, Line 22, MH-83-L22 to MH-84-L22 and MH-84-L22
Line 22 Zone 4B Division 31 28-Aug-2017 29-Aug-2017 3:00 PM 30-Aug-2017 B comments
Closed
to MH-87-L22 and MH-87-L22 to MH-88-L22
First Coat Damp Proofing Installation Inspection for Storm Manholes
(Precast Yard) Zone Line 10 & 11
1657 KHEP-CI-1657
1B, Line 10 & 11 & 13, MH-I31-L10 and MH-I33-L11 and MH-I39-L13 & 13
Zone 1B Division 31 28-Aug-2017 29-Aug-2017 3:00 PM 30-Aug-2017 A Approved Closed
and MH-I40-L13
Termite control surface preparation, installation and final inspection
1658 KHEP-CI-1658 for Grade Beam Cluster 73, B2 NA Division 03 28-Aug-2017 29-Aug-2017 10:00 AM 30-Aug-2017 E Rejected Closed
Cluster 73, B2
Termite control surface preparation, installation and final inspection
1658.1 KHEP-CI-1658-01 for Grade Beam Cluster 73, B2 NA Division 03 6-Sep-2017 7-Sep-2017 10:00 AM 9-Sep-2017 A Approved Closed
Cluster 73, B2
Blinding concrete sampling, Testing & placement inspection for
1659 KHEP-CI-1659 Grade Beam Cluster 73, B2 NA Division 03 28-Aug-2017 29-Aug-2017 10:30 AM 30-Aug-2017 E Rejected Closed
Cluster 73, B2
Blinding concrete sampling, Testing & placement inspection for
1659.1 KHEP-CI-1659-01 Grade Beam Cluster 73, B2 NA Division 03 6-Sep-2017 7-Sep-2017 10:30 AM 9-Sep-2017 A Approved Closed
Cluster 73, B2
Termite control surface preparation, installation and final inspection
Cluster 6,
1660 KHEP-CI-1660 for Grade Beam
BC4
NA Division 03 28-Aug-2017 29-Aug-2017 10:00 AM 30-Aug-2017 A Approved Closed
Cluster 6, BC4
Blinding concrete sampling, Testing & placement inspection for
Cluster 6,
1661 KHEP-CI-1661 Grade Beam
BC4
NA Division 03 28-Aug-2017 29-Aug-2017 10:30 AM 30-Aug-2017 A Approved Closed
Cluster 6, BC4
Termite control surface preparation, installation and final inspection
1662 KHEP-CI-1662 for Grade Beam Cluster 19 B2 NA Division 03 28-Aug-2017 29-Aug-2017 10:00 AM 30-Aug-2017 A Approved Closed
Cluster 19, B2
Blinding concrete sampling, Testing & placement inspection for
1663 KHEP-CI-1663 Grade Beam Cluster 19 B2 NA Division 03 28-Aug-2017 29-Aug-2017 10:30 AM 30-Aug-2017 A Approved Closed
Cluster 19, B2
Termite control surface preparation, installation and final inspection
Cluster 26,
1664 KHEP-CI-1664 for Footing
BC4
NA Division 03 28-Aug-2017 29-Aug-2017 10:00 AM 30-Aug-2017 A Approved Closed
Cluster 26, BC4
Blinding concrete sampling, Testing & placement inspection for
Cluster 26,
1665 KHEP-CI-1665 Footing
BC4
NA Division 03 28-Aug-2017 29-Aug-2017 10:30 AM 30-Aug-2017 A Approved Closed
Cluster 26, BC4
Termite control surface preparation, installation and final inspection
1666 KHEP-CI-1666 for Grade Beam Cluster 8, B2 NA Division 03 28-Aug-2017 29-Aug-2017 10:00 AM 30-Aug-2017 A Approved Closed
Cluster 8, B2
Blinding concrete sampling, Testing & placement inspection for
1667 KHEP-CI-1667 Grade Beam Cluster 8, B2 NA Division 03 28-Aug-2017 29-Aug-2017 10:30 AM 30-Aug-2017 A Approved Closed
Cluster 8, B2
Inspection Form work for base & wall and concrete pouring for Storm
Manholes (Precast Yard) Zone Line 13 & 14
1668 KHEP-CI-1668
1B & 4B, Line 13 & 14 & 15 & 22, MH-45-L13 and MH-44-L14 and & 15 & 22
Zone 1B & 4B Division 33 5-Sep-2017 6-Sep-2017 3:00 PM 7-Sep-2017 E Rejected Closed
MH-49-L15 and MH-88-L22 and MH-89-L22
Inspection Form work for base & wall and concrete pouring for Storm
Manholes (Precast Yard) Zone Line 13 & 14
1668.1 KHEP-CI-1668-01
1B & 4B, Line 13 & 14 & 15 & 22, MH-45-L13 and MH-44-L14 and & 15 & 22
Zone 1B & 4B Division 33 9-Sep-2017 10-Sep-2017 3:00 PM 10-Sep-2017 A Approved Closed
MH-49-L15 and MH-88-L22 and MH-89-L22
Second coat, Bituminous Damp Proofing Installation Inspection for
Storm Manholes (Precast Yard) Line 10 & 11
1669 KHEP-CI-1669
Zone 1B, Line 10 & 11 & 13, MH-I33-L10 and MH-I34-L11 and MH- & 13
Zone 1B Division 33 2-Nov-2017 4-Nov-2017 3:00 PM 5-Nov-2017 A Approved Closed
I42-L13 and MH-I39-L13 and MH-I40-L13
Concrete sampling , testing and placement inspection for RC Footing
Cluster 25, Approved w/
1670 KHEP-CI-1670
BC4
NA Division 03 29-Aug-2017 30-Aug-2017 9:00 AM 30-Aug-2017 B comments
Closed
Cluster 25, BC4
Concrete sampling , testing and placement inspection for RC Column
Approved w/
1671 KHEP-CI-1671 (Ground Floor) Cluster 7, B2 NA Division 03 29-Aug-2017 30-Aug-2017 9:00 AM 30-Aug-2017 B comments
Closed
Cluster 7, B2
Installation of reinforcing steel bar, Embedded item and form closure
Cluster 50,
1672 KHEP-CI-1672 inspection for RC Column Neck Cluster 50,
BC4
NA Division 03 29-Aug-2017 30-Aug-2017 10:00 AM 30-Aug-2017 A Approved Closed
BC4
Cast in place concrete Form work inspection for RC Column (First
Floor)
1673 KHEP-CI-1673
Cluster 12, B2
Cluster 12 B2 NA Division 03 29-Aug-2017 30-Aug-2017 3:00 PM 5-Sep-2017 E Rejected Closed

Cast in place concrete Form work inspection for RC Column (First


Floor)
1673.1 KHEP-CI-1673-01
Cluster 12, B2
Cluster 12 B2 NA Division 03 6-Sep-2017 7-Sep-2017 10:00 AM 9-Sep-2017 A Approved Closed

70 cm, CMU,mortar and masonry inspection under exterior reinforced


1674 KHEP-CI-1674 Grad Beam Cluster Cluster 54, B2 NA Division 04 5-Sep-2017 6-Sep-2017 10:00 AM 9-Sep-2017 A Approved Closed
54, B2
70 cm, CMU,mortar and masonry inspection under exterior reinforced
1675 KHEP-CI-1675 Grad Beam Cluster Cluster 27, B2 NA Division 04 5-Sep-2017 6-Sep-2017 11:00 AM 9-Sep-2017 A Approved Closed
27, B2
First Coat, Damp Proofing Installation Inspection for CMU, Mortar
and Masonry Inspection Under Exterior Reinforced Grad beam
1676 KHEP-CI-1676 Cluster 58, B2 NA Division 07 5-Sep-2017 6-Sep-2017 10:30 AM 7-Sep-2017 A Approved Closed
Cluster 58, B2
Installation of reinforcing steel bar, Embedded item and form closure
Cluster 81, Approved w/
1677 KHEP-CI-1677 inspection for RC Column (Ground Floor)
A6
NA Division 03 5-Sep-2017 6-Sep-2017 3:00 PM 7-Sep-2017 B comments
Closed
Cluster 81, A6
Installation of reinforcing steel bar, Embedded item and form closure
1678 KHEP-CI-1678 inspection for RC Column (First Floor) Cluster Cluster 11 B2 NA Division 03 5-Sep-2017 6-Sep-2017 3:00 PM 7-Sep-2017 A Approved Closed
11, B2
Cast in place concrete Form work inspection for RC First Floor Slab
1679 KHEP-CI-1679
Cluster 10, B2
Cluster 10 B2 NA Division 03 5-Sep-2017 6-Sep-2017 3:00 PM 7-Sep-2017 A Approved Closed

Installation of reinforcing steel bar, Embedded item and form closure


1680 KHEP-CI-1680 inspection for RC First Floor Slab Cluster 10 B2 NA Division 03 5-Sep-2017 6-Sep-2017 3:00 PM 7-Sep-2017 A Approved Closed
Cluster 10, B2
Inspection of Sand Filling Around pipe Storm Maine Line Dia 400 &
500mm Approved w/
1681 KHEP-CI-1681
Zone 2B, Line 1 & 3, MH-I8-L01 to MH-9-L01 and MH-
Line 1 & 3 Zone 2B Division 31 5-Sep-2017 6-Sep-2017 11:00 AM 7-Sep-2017 B comments
Closed
I7-L03 to MH-I8-L01
Inspection of Sand Filling Around pipe Storm Maine Line Dia 400mm
Approved w/
1682 KHEP-CI-1682 Line 36 Zone 4B Division 31 5-Sep-2017 6-Sep-2017 11:00 AM 7-Sep-2017 B comments
Closed
Zone 4B, Line 36, MH-I33-L36 to MH-I26-L26
Compaction test of sand bedding under pipe trench - Sewer main
line Dia 200mm
Approved w/
1683 KHEP-CI-1683 Zone 4B, Line 19 & 18, MH-3-L19 to MH-2-L19 and MH-2-L19 to Line 19 & 18 Zone 4B Division 31 5-Sep-2017 6-Sep-2017 11:30 AM 7-Sep-2017 B comments
Closed
MH-1-L19 and MH-1-L19 to MH-21-L01 and MH-1-L18 to MH-1a-L18
and MH-1a-L18 to MH-2-L19
Compaction test Around Footing General fill (Final layer) Zone
1684 KHEP-CI-1684
3B, Cluster 61, B2
Cluster 61, B2 Zone 3B Division 31 6-Sep-2017 7-Sep-2017 11:30 AM 9-Sep-2017 A Approved Closed
Compaction test Between Cluster General fill (Formation level)
Cluster 44 &
1685 KHEP-CI-1685
45
Zone 2B Division 31 6-Sep-2017 7-Sep-2017 11:00 AM 9-Sep-2017 A Approved Closed
Zone 2B, Cluster 44 & 45
Compaction test of Sand Filling Above the pipe trench and laying
1686 KHEP-CI-1686 warning tape Storm Maine Line Dia 400mm Zone 2B, Line 2 Zone 2B Division 31 6-Sep-2017 7-Sep-2017 10:30 AM 7-Sep-2017 A Approved Closed
Line 2, MH-I4-L02 to MH-I5-L02 and MH-I5-L02 to MH-6-L01

Concrete sampling , testing and placement inspection for RC Footing


Cluster 36,
1687 KHEP-CI-1687
BC4
NA Division 03 6-Sep-2017 7-Sep-2017 9:00 AM 9-Sep-2017 A Approved Closed
Cluster 36, BC4
Concrete sampling , testing and placement inspection for RC Footing
Cluster 55,
1688 KHEP-CI-1688
BC4
NA Division 03 6-Sep-2017 7-Sep-2017 9:00 AM 9-Sep-2017 A Approved Closed
Cluster 55, BC4
Concrete sampling , testing and placement inspection for RC First
1689 KHEP-CI-1689 Floor Slab Cluster 11 B2 NA Division 03 6-Sep-2017 7-Sep-2017 9:00 AM 9-Sep-2017 A Approved Closed
Cluster 11, B2
First Coat, Damp Proofing Installation Inspection for CMU, Mortar
and Masonry Inspection Under Exterior Reinforced Grad beam
1690 KHEP-CI-1690 Cluster 48, B2 NA Division 07 6-Sep-2017 7-Sep-2017 11:00 AM 9-Sep-2017 A Approved Closed
Cluster 48, B2
First Coat, Damp Proofing Installation Inspection for CMU, Mortar
and Masonry Inspection Under Exterior Reinforced Grad beam Cluster 43,
1691 KHEP-CI-1691
A6
NA Division 07 6-Sep-2017 7-Sep-2017 10:30 AM 9-Sep-2017 A Approved Closed
Cluster 43, A6
Second Coat, Damp Proofing Installation Inspection for CMU, Mortar
and Masonry Inspection Under Exterior Reinforced Grad beam
1692 KHEP-CI-1692 Cluster 58, B2 NA Division 07 6-Sep-2017 7-Sep-2017 10:30 AM 9-Sep-2017 A Approved Closed
Cluster 58, B2
Installation of reinforcing steel bar, Embedded item and form closure
1693 KHEP-CI-1693 inspection for RC First Floor Slab Cluster 68, B2 NA Division 03 7-Sep-2017 9-Sep-2017 10:00 AM 9-Sep-2017 A Approved Closed
Cluster 68, B2
Installation of reinforcing steel bar, Embedded item and form closure
inspection for RC Column neck for grid line (B5,D5,F5,H5) Cluster 79,
1694 KHEP-CI-1694
Cluster 79, BC4
NA Division 03 7-Sep-2017 9-Sep-2017 10:00 AM 9-Sep-2017 A Approved Closed
BC4
Cast in place concrete Form work inspection for RC Column neck
excluding axis (B5,D5,F5,H5) Cluster 79,
1695 KHEP-CI-1695
Cluster 79, BC4 BC4
NA Division 03 7-Sep-2017 9-Sep-2017 10:00 AM 9-Sep-2017 A Approved Closed

Check the survey work, elevation and coordinate for billnding footing
Cluster 42,
1696 KHEP-CI-1696
Cluster 42, BC4 BC4
NA Division 03 7-Sep-2017 9-Sep-2017 10:00 AM 10-Sep-2017 A Approved Closed

Check the survey work, elevation and coordinate for billnding footing
Cluster 41,
1697 KHEP-CI-1697
Cluster 41, BC4 BC4
NA Division 03 7-Sep-2017 9-Sep-2017 10:00 AM 10-Sep-2017 A Approved Closed

Check the survey work, elevation and coordinate for billnding footing
Cluster 74,
1698 KHEP-CI-1698
Cluster 74, BC4 BC4
NA Division 03 7-Sep-2017 9-Sep-2017 10:00 AM 10-Sep-2017 A Approved Closed

Check the survey work, elevation and coordinate for blinding under
grade beam
1699 KHEP-CI-1699
Cluster 20, B2
Cluster 20 B2 NA Division 03 7-Sep-2017 9-Sep-2017 10:00 AM 10-Sep-2017 E Rejected Closed

Check the survey work, elevation and coordinate for blinding under
grade beam
1699.1 KHEP-CI-1699-01
Cluster 20, B2
Cluster 20 B2 NA Division 03 11-Sep-2017 12-Sep-2017 10:00 AM 12-Sep-2017 A Approved Closed

70 cm, CMU,mortar and masonry inspection under exterior reinforced


1700 KHEP-CI-1700 Grad Beam Cluster Cluster 52, B2 NA Division 04 7-Sep-2017 9-Sep-2017 3:00 PM 10-Sep-2017 A Approved Closed
52, B2
70 cm, CMU,mortar and masonry inspection under exterior reinforced
1701 KHEP-CI-1701 Grad Beam Cluster Cluster 51, B2 NA Division 04 7-Sep-2017 9-Sep-2017 3:00 PM 10-Sep-2017 A Approved Closed
51, B2
Check the survey work, elevation and coordinate for billnding under
grade beam
1702 KHEP-CI-1702
Cluster 61, B2
Cluster 61, B2 NA Division 03 7-Sep-2017 9-Sep-2017 10:00 AM 10-Sep-2017 A Approved Closed

Check the survey work, elevation and coordinate for bilnding under
grade beam Cluster 44,
1703 KHEP-CI-1703
Cluster 44, A6 A6
NA Division 03 7-Sep-2017 9-Sep-2017 10:00 AM 10-Sep-2017 E Rejected Closed
Check the survey work, elevation and coordinate for bilnding under
grade beam Cluster 44,
1703.1 KHEP-CI-1703-01
Cluster 44, A6 A6
NA Division 03 11-Sep-2017 12-Sep-2017 10:00 AM 12-Sep-2017 A Approved Closed

Cast in place concrete Form work inspection for RC Grade Beam


Cluster 66,
1704 KHEP-CI-1704
Cluster 66, A6 A6
NA Division 03 7-Sep-2017 9-Sep-2017 3:00 PM 11-Sep-2017 A Approved Closed

Second Coat, Damp Proofing Installation Inspection for CMU, Mortar


and Masonry Inspection Under Exterior Reinforced Grad beam
1705 KHEP-CI-1705 Cluster 48, B2 NA Division 07 7-Sep-2017 9-Sep-2017 11:00 AM 9-Sep-2017 A Approved Closed
Cluster 48, B2
Second Coat, Damp Proofing Installation Inspection for CMU, Mortar
and Masonry Inspection Under Exterior Reinforced Grad beam Cluster 43,
1706 KHEP-CI-1706
A6
NA Division 07 7-Sep-2017 9-Sep-2017 11:00 AM 9-Sep-2017 A Approved Closed
Cluster 43, A6

Compaction test of Sand Filling Above the pipe trench and laying
warning tape Storm Maine Line Dia 200mm Zone 3B,
Approved w/
1707 KHEP-CI-1707 Line 14 & 13, MH-2-L14 to MH-1-L14 and MH-1-L14 to MH-1a-L14 Line 14 & 13 Zone 3B Division 31 7-Sep-2017 9-Sep-2017 11:30 AM 10-Sep-2017 B comments
Closed
and MH-1a-L14 to MH-1-L13 and MH-2-L13 to MH-11-L13 and MH-
1-L13 to MH-1a-L13 and MH-1a-L13 to MH-14-L01

Inspection of Sand Filling Around pipe Storm Maine Line Dia 400mm
Approved w/
1708 KHEP-CI-1708
Zone 3B, Line 21, MH-77-L21 to MH-78-L21 and MH-78-L21
Line 21 Zone 3B Division 31 7-Sep-2017 9-Sep-2017 11:00 AM 10-Sep-2017 B comments
Closed
to MH-79-L21
Compaction test between cluster general fill (formation level)
Cluster 4 &
1709 KHEP-CI-1709
43
Zone 2A Division 31 7-Sep-2017 9-Sep-2017 11:00 AM 9-Sep-2017 E Rejected Closed
Zone 2A, Cluster 4 & 43
Concrete sampling , testing and placement inspection for RC Roof
1710 KHEP-CI-1710 Slab Cluster 01 A6 NA Division 03 9-Sep-2017 10-Sep-2017 9:00 AM 11-Sep-2017 A Approved Closed
Cluster 1, A6
Concrete sampling , testing and placement inspection for RC First
1711 KHEP-CI-1711 Floor Slab Cluster 10 B2 NA Division 03 9-Sep-2017 10-Sep-2017 9:00 AM 11-Sep-2017 A Approved Closed
Cluster 10, B2
Concrete sampling , testing and placement inspection for RC Column
1712 KHEP-CI-1712 (First Floor) Cluster 12 B2 NA Division 03 9-Sep-2017 10-Sep-2017 9:00 AM 11-Sep-2017 A Approved Closed
Cluster 12, B2
Concrete sampling , testing and placement inspection for RC Stair
1713 KHEP-CI-1713 First Flight Cluster 17 B2 NA Division 03 9-Sep-2017 10-Sep-2017 9:00 AM 11-Sep-2017 A Approved Closed
Cluster
Cast in place 17, B2
concrete Form work inspection for RC Footing
Cluster Cluster 26,
1714 KHEP-CI-1714
26, A6 A6
NA Division 03 9-Sep-2017 10-Sep-2017 3:00 PM 11-Sep-2017 A Approved Closed

Installation of reinforcing steel bar, Embedded item and form closure


Cluster 26,
1715 KHEP-CI-1715 inspection for RC Footing
A6
NA Division 03 9-Sep-2017 10-Sep-2017 3:00 PM 11-Sep-2017 A Approved Closed
Cluster 26, A6
Installation of reinforcing steel bar, Embedded item and form closure
1716 KHEP-CI-1716 inspection for RC Column (First Floor) Cluster 10 B2 NA Division 03 9-Sep-2017 10-Sep-2017 3:00 PM 11-Sep-2017 A Approved Closed
Cluster 10, B2
Cast in place concrete Form work inspection for RC Column Neck
Cluster 60,
1717 KHEP-CI-1717
Cluster 60, BC4 BC4
NA Division 03 9-Sep-2017 10-Sep-2017 10:00 AM 12-Sep-2017 A Approved Closed

Inspection of excavated and Compaction formation for Pipe trench


1718 KHEP-CI-1718 Sewer Maine line Dia 200mm Zone Line 17 Zone 4B Division 31 9-Sep-2017 10-Sep-2017 11:30 AM 11-Sep-2017 A Approved Closed
4B, Line 17, MH-2-L17 to MH-2a-L17 and MH-2a-L17 to MH-1-L17

Inspection of Sand Filling Around pipe Storm Maine Line Dia 400 &
500mm
1719 KHEP-CI-1719
Zone 3B, Line 22, MH-83-L22 to MH-84-L22 and MH-
Line 22 Zone 3B Division 31 9-Sep-2017 10-Sep-2017 11:00 AM 11-Sep-2017 A Approved Closed
84-L22 to MH-87-L22 and MH-87-L22 to MH-88-L22
Compaction test of Sand Filling Above the pipe trench and laying
1720 KHEP-CI-1720 warning tape Storm Maine Line Dia 400mm Zone 4B, Line 36 Zone 4B Division 31 9-Sep-2017 10-Sep-2017 11:00 AM 11-Sep-2017 A Approved Closed
Line 36, MH-133-L36 to MH-126-L26
Installation Inspection of Precast Storm Drainage Manholes
Line 10 & 11 Approved w/
1721 KHEP-CI-1721 Zone 1B, Line 10 &
& 13
Zone 1B Division 33 9-Sep-2017 10-Sep-2017 3:00 PM 11-Sep-2017 B comments
Closed
11 & 13, MH-I31-L10 and MH-I33-L11 and MH-I39-L13
Cast in place concrete Form work inspection for RC Column Neck
axis (B5,D5,F5,H5) Cluster 79,
1722 KHEP-CI-1722
Cluster 79, BC4 BC4
NA Division 03 9-Sep-2017 10-Sep-2017 10:00 AM 11-Sep-2017 A Approved Closed
Cast in place concrete Form work inspection for RC footing
Cluster 76,
1723 KHEP-CI-1723 Cluster
BC4
NA Division 03 10-Sep-2017 11-Sep-2017 10:00 AM 12-Sep-2017 A Approved Closed
76, BC4
Installation of reinforcing steel bar, embedded item and form closure
Cluster 76,
1724 KHEP-CI-1724 inspection for RC footing
BC4
NA Division 03 10-Sep-2017 11-Sep-2017 10:00 AM 12-Sep-2017 A Approved Closed
Cluster 76, BC4
Cast in place concrete Form work inspection for RC footing
Cluster 37,
1725 KHEP-CI-1725 Cluster
BC4
NA Division 03 10-Sep-2017 11-Sep-2017 10:00 AM 12-Sep-2017 A Approved Closed
37, BC4
Installation of rainforcing steel bar, embedded item and form closure
Cluster 37,
1726 KHEP-CI-1726 inspection for RC footing
BC4
NA Division 03 10-Sep-2017 11-Sep-2017 10:00 AM 12-Sep-2017 A Approved Closed
Cluster 76, BC4
Installation of rainforcing steel bar, embedded item and form closure
Cluster 66, Approved w/
1727 KHEP-CI-1727 inspection for RC Grade Beam
A6
NA Division 03 10-Sep-2017 11-Sep-2017 10:00 AM 12-Sep-2017 B comments
Closed
Cluster 66, BC4
Termite control surface preparation, installation and final inspection
Cluster 42,
1728 KHEP-CI-1728 for footing Cluster
BC4
NA Division 03 10-Sep-2017 11-Sep-2017 10:00 AM 12-Sep-2017 A Approved Closed
42, BC4
Termite control surface preparation, installation and final inspection
Cluster 41,
1729 KHEP-CI-1729 for footing Cluster
BC4
NA Division 03 10-Sep-2017 11-Sep-2017 10:00 AM 12-Sep-2017 A Approved Closed
41, BC4
Termite control surface preparation, installation and final inspection
Cluster 74,
1730 KHEP-CI-1730 for footing Cluster
BC4
NA Division 03 10-Sep-2017 11-Sep-2017 10:00 AM 11-Sep-2017 A Approved Closed
74, BC4

Termite control surface preparation, installation and final inspection


1731 KHEP-CI-1731
for grade beam Cluster 61, B2
Cluster 61, B2 NA Division 03 10-Sep-2017 11-Sep-2017 10:00 AM 11-Sep-2017 A Approved Closed

Cast in place concrete Form work inspection for RC column (ground


floor) axis
Cluster 81,
1732 KHEP-CI-1732 (A2,A4,B1,B4,B5,B6,C4,D4,D5,D6,E2,E3,F1,F4,F5,F6,G4,H4,H5,H6,
A6
NA Division 03 10-Sep-2017 11-Sep-2017 3:00 PM 12-Sep-2017 A Approved Closed
A-B/3-4 , E-D/3-4 , E-F/3-4)
Cluster 81, A6
Cast in place concrete Form work inspection for RC column neck
Cluster 22,
1733 KHEP-CI-1733 Cluster 22,
BC4
NA Division 03 10-Sep-2017 11-Sep-2017 10:30 AM 12-Sep-2017 A Approved Closed
BC4

Cast in place concrete Form work inspection for RC grade beam


1734 KHEP-CI-1734
Cluster 4, A6
Cluster 4, A6 NA Division 03 10-Sep-2017 11-Sep-2017 3:00 PM 12-Sep-2017 A Approved Closed

Inspection of Dam proofing Surface Preparation for Storm manhole -


(Precast yard) Zone 1B,
1735 KHEP-CI-1735
Line 15 &14 , MH-46-L15, MH-47-L15, MH-43-L14, MH-48-L15
Line 15 & 14 Zone 1B Division 31 10-Sep-2017 11-Sep-2017 3:00 PM 12-Sep-2017 A Approved Closed

Compaction test of sand filling above the pipe trench and laying
warning tape - storm main line Dia 400 & 500mm Approved w/
1736 KHEP-CI-1736
Zone 2B, Line 03 & 01,MH-I7-L03 to MH-
Line 3 & 1 Zone 2B Division 31 10-Sep-2017 11-Sep-2017 11:00 AM 12-Sep-2017 B comments
Closed
I8-L01, MH-I8-L01 to MH-9-L01
Concrete sampling, testing and placement inspection for RC column
Approved w/
1737 KHEP-CI-1737 (Ground Floor) Cluster 3, A6 NA Division 03 11-Sep-2017 12-Sep-2017 9:00 AM 13-Sep-2017 B comments
Closed
Cluster 3, A6
Concrete sampling, testing and placement inspection for RC first floor
Approved w/
1738 KHEP-CI-1738 slab Cluster 68, Cluster 68, B2 NA Division 03 11-Sep-2017 12-Sep-2017 9:00 AM 13-Sep-2017 B comments
Closed
B2

First coat Damp Proofing Installation Inspection for CMU, morter and
1739 KHEP-CI-1739
masonry inspection under exterior reinforced G.B Cluster 54, B2
Cluster 54, B2 NA Division 07 11-Sep-2017 12-Sep-2017 11:00 AM 14-Sep-2017 A Approved Closed

Compaction test of sand filling above the pipe trench an lying


warning tape, Strom maine line Dia 400&500mm MH-
1740 KHEP-CI-1740 83-L22 to MH-84-L22, MH-84-L22 to MH-87-L22, MH-87-L22 to MH- Line 22 Zone 4B Division 31 11-Sep-2017 12-Sep-2017 11:00 AM 14-Sep-2017 A Approved Closed
88-L22
Zone 4B, Line 22
Compaction test of sand filling above the pipe trench an lying
warning tape, Strom maine line Dia 400&500mm MH-
Approved w/
1741 KHEP-CI-1741 77-L21 to MH-78-L21, MH-78-L21 to MH-79-L21 Line 21 Zone 3B Division 31 11-Sep-2017 12-Sep-2017 11:00 AM 13-Sep-2017 B comments
Closed
Zone 3B Line 21

Compaction test of sand bedding under pipe trench, sewer main line
Dia 200mm Zone 4B Approved w/
1742 KHEP-CI-1742
Line 17 ,MH-2-L17 to MH-2-A-L17, MH-2-A-L17 to MH-1-L17
Line 17 Zone 4B Division 31 11-Sep-2017 12-Sep-2017 11:30 AM 13-Sep-2017 B comments
Closed
Compact test around footing general fill (Final layer) Zone
1743 KHEP-CI-1743
3B, Cluster 58, B2
Cluster 58, B2 Zone 3B Division 31 11-Sep-2017 12-Sep-2017 10:30 AM 13-Sep-2017 E Rejected Closed

Compaction test around footing general fill final layer


1743.1 KHEP-CI-1743-01
Zone 3B, Cluster 58, B2
Cluster 58, B2 Zone 3B Division 31 14-Sep-2017 16-Sep-2017 10:30 AM 19-Sep-2017 A Approved Closed
Inspection of excavated and compaction formation for pipe trench,
Strom main line Dia 500mm, Zone 3B, Approved w/
1744 KHEP-CI-1744
Line 20, MH-67-L20 to MH-68-L20
Line 20 Zone 3B Division 31 11-Sep-2017 12-Sep-2017 11:00 AM 13-Sep-2017 B comments
Closed

Inspection of damproofing surface preparation for strom manholes,


(Precast yard) Zone 1B & 2B,
Line 21,11 &
1745 KHEP-CI-1745 Line 21,11 & 13, MH-I80-L21 and MH-I81-L21 (Square), MH-I34-L11
13
Zone 1B & 2 Division 33 11-Sep-2017 12-Sep-2017 3:00 PM 14-Sep-2017 A Approved Closed
(Square), MH-I41-L13 (Square)

Cast in place concrete form work inspection for RC Footing Cluster Cluster 56,
1746 KHEP-CI-1746
56, BC4 BC4
NA Division 03 12-Sep-2017 13-Sep-2017 10:00 AM 14-Sep-2017 A Approved Closed

Installation of reinforcing steel bar, embedded item and form closure


Cluster 56,
1747 KHEP-CI-1747 inspection for RC Footing
BC4
NA Division 03 12-Sep-2017 13-Sep-2017 10:00 AM 14-Sep-2017 A Approved Closed
Cluster 56, BC4
Cast in place concrete form work inspection for RC Cloumn neck
Cluster 50,
1748 KHEP-CI-1748 Cluster 50,
BC4
NA Division 03 12-Sep-2017 13-Sep-2017 11:00 AM 14-Sep-2017 A Approved Closed
BC4
Blinding concrete sampling, testing and placement inspection for
Cluster 41,
1749 KHEP-CI-1749 footing
BC4
NA Division 03 12-Sep-2017 13-Sep-2017 9:00 AM 14-Sep-2017 A Approved Closed
Cluster 41, BC4
Blinding concrete sampling, testing and placement inspection for
Cluster 42,
1750 KHEP-CI-1750 footing
BC4
NA Division 03 12-Sep-2017 13-Sep-2017 9:00 AM 14-Sep-2017 A Approved Closed
Cluster 42, BC4
Concrete sampling, testing and placement inspection for RC footing
Cluster 26,
1751 KHEP-CI-1751 Cluster 26,
BC4
NA Division 03 12-Sep-2017 13-Sep-2017 9:00 AM 14-Sep-2017 A Approved Closed
BC4
Inspection of excavated and compaction formation for pipe trench
storm main line Dia 700&400mm Zone Line 37 & 18 Approved w/
1752 KHEP-CI-1752
5A, Line 37 & 18, MH-134-L37 to MH-75-L18, MH-75-L18 to MH-74-
Zone 5A Division 31 12-Sep-2017 13-Sep-2017 3:00 PM 14-Sep-2017 B comments
Closed
L18

Termite control surface preparation, installation and final inspection


1753 KHEP-CI-1753
for blinding concrete under grade beam Cluster 20, B2
Cluster 20 B2 NA Division 03 12-Sep-2017 13-Sep-2017 3:00 PM 14-Sep-2017 A Approved Closed

Termite control surface preparation, installation and final inspection Cluster 44,
1754 KHEP-CI-1754
for blinding concrete under grade beam Cluster 44, A6 A6
NA Division 03 12-Sep-2017 13-Sep-2017 3:00 PM 14-Sep-2017 A Approved Closed

Installation of reinforcing steel bar, embedded item and form closure


1755 KHEP-CI-1755 inspection for RC Grade Beam Cluster 04 A6 NA Division 03 12-Sep-2017 13-Sep-2017 10:00 AM 14-Sep-2017 A Approved Closed
Cluster 04, A6
Cast in place concrete formwork inspection for RC Column ground
Cluster 81,
1756 KHEP-CI-1756 floor axis (A1,B2,C3,D2,D3,E1,J2,J3) Cluster 81,
A6
NA Division 03 12-Sep-2017 13-Sep-2017 10:00 AM 14-Sep-2017 A Approved Closed
A6
Cast in place concrete formwork inspection for RC grade beam
Cluster 16
1757 KHEP-CI-1757 Cluster 16,
BC4
NA Division 03 12-Sep-2017 13-Sep-2017 3:00 PM 14-Sep-2017 A Approved Closed
BC4
Compaction test of sand bedding under pipe trench, Storm main line
Approved w/
1758 KHEP-CI-1758 Dia 500mm Zone 3B, Line 2 Zone 3B Division 31 12-Sep-2017 13-Sep-2017 11:30 AM 14-Sep-2017 B comments
Closed
Line 20, MH-67-L20 to MH-68-L20
Inspection for sand filling around pipe, sewer maine line Dia 200mm
Zone 4B,
1759 KHEP-CI-1759 Line 19 & 18, MH-3-L19 to MH-2-L19 and MH-2L19 to MH-1-L19, Line 19 & 18 Zone 4B Division 31 12-Sep-2017 13-Sep-2017 11:00 AM 14-Sep-2017 B Approved Closed
MH-1-L19 to MH-21-L01, MH-1-L18 to MH-1-A-L18, MH-1-A-L18 to
MH-2-L19

First coat, bituminous damp proofing installation inspection for storm


Line 15 & 14 Approved w/
1760 KHEP-CI-1760 manholes, precast yard Zone 1B, Zone 1B Division 33 12-Sep-2017 13-Sep-2017 3:00 PM 14-Sep-2017 B comments
Closed
Line 15 & 14, MH-46-L15, MH-47-L15 and MH-48-L15, MH-43-L14

Inspection of Reinforcement steel bar and internal Shutter for


manholes (Precast yard) Line 12,11 &
1761 KHEP-CI-1761
Zone 1A & 1B , Line 12,11 & 17, MH-55-L17 and MH-36-L12 MH- 17
Zone 1A &1B Division 33 12-Sep-2017 13-Sep-2017 3:00 PM 14-Sep-2017 A Approved Closed
37-L11 and MH-38-L11
Inspection of Reinforcement steel bar and internal Shutter for
manholes (Precast yard)
1762 KHEP-CI-1762
Zone 2B, Line 09 & 02, MH-I24-L09, MH--I25-L09, MH-I4-L02 and
Line 9 & 2 Zone 2B Division 33 12-Sep-2017 13-Sep-2017 3:00 PM 14-Sep-2017 A Approved Closed
MH-I5-L02
Second coat damproofing installation inspection for CMU, morter and
1763 KHEP-CI-1763 masonary inspection under exterior reinforced grade beam Cluster 54, B2 NA Division 07 13-Sep-2017 14-Sep-2017 11:00 AM 16-Sep-2017 A Approved Closed
Cluster 54, B2

First coat damproofing installation inspection for CMU, morter and


1764 KHEP-CI-1764 masonary inspection under exterior reinforced grade beam Cluster 51, B2 NA Division 07 13-Sep-2017 14-Sep-2017 11:00 AM 16-Sep-2017 A Approved Closed
Cluster 51, B2

First coat damproofing installation inspection for CMU, morter and


1765 KHEP-CI-1765 masonary inspection under exterior reinforced grade beam Cluster 52, B2 NA Division 07 13-Sep-2017 14-Sep-2017 11:00 AM 16-Sep-2017 A Approved Closed
Cluster 52, B2

Blinding concrete sampling, testing and placement for grade beam


1766 KHEP-CI-1766 Cluster 61, Cluster 61, B2 NA Division 03 13-Sep-2017 14-Sep-2017 9:00 AM 16-Sep-2017 A Approved Closed
B2
Blinding concrete sampling, testing and placement for footing Cluster 74,
1767 KHEP-CI-1767
Cluster 74, BC4 BC4
NA Division 03 13-Sep-2017 14-Sep-2017 9:00 AM 16-Sep-2017 A Approved Closed

Concrete sampling, testing and placement for RC grade beam Cluster 66, Approved w/
1768 KHEP-CI-1768
Cluster 66, A6 A6
NA Division 03 13-Sep-2017 14-Sep-2017 9:00 AM 14-Sep-2017 B comments
Closed

Installation of rein forcing steel bar, embedded item and form closure Cluster 26,
1769 KHEP-CI-1769
inspection for RC Column Neck Cluster 26, BC4 BC4
NA Division 03 13-Sep-2017 14-Sep-2017 3:00 PM 16-Sep-2017 A Approved Closed

Installation of rein forcing steel bar, embedded item and form closure Cluster 36,
1770 KHEP-CI-1770
inspection for RC Column Neck Cluster 36, BC4 BC4
NA Division 03 13-Sep-2017 14-Sep-2017 10:00 AM 14-Sep-2017 A Approved Closed

70cm, CMU morter and masonry inspection under exterior reinforced


1771 KHEP-CI-1771 grade beam Cluster 35, B2 NA Division 03 13-Sep-2017 14-Sep-2017 3:00 PM 16-Sep-2017 A Approved Closed
Cluster 35, B2
Cast in place concrete formwork inspection for RC column (first floor)
1772 KHEP-CI-1772 Cluster 11, Cluster 11 B2 NA Division 03 13-Sep-2017 14-Sep-2017 11:00 AM 16-Sep-2017 A Approved Closed
B2
Cast in place concrete formwork inspection for RC column ground
Cluster 81,
1773 KHEP-CI-1773 floor axis(B3,C5,F2,G3,G6,K2,H3)
A6
NA Division 03 13-Sep-2017 14-Sep-2017 3:00 PM 16-Sep-2017 A Approved Closed
Cluster 81, A6

Compaction test of sand bedding under pipe trench, storm main line
Approved w/
1774 KHEP-CI-1774 Dia 400mm Zone 4B, Line 33 Zone 4B Division 33 13-Sep-2017 14-Sep-2017 11:30 AM 16-Sep-2017 B comments
Closed
Line 33, MH-I121-L33 to MH-I122-L33, MH-I122-L33 to MH-I123-L33

Compaction test of sand bedding under pipe trench, storm main line
Dia 400 & 700mm Approved w/
1775 KHEP-CI-1775
Zone 5A, Line 37 & 18, MH-134-L37 to MH-75-L18, MH-75-L18 to
Line 37 & 18 Zone 5A Division 31 13-Sep-2017 14-Sep-2017 10:00 AM 16-Sep-2017 B comments
Closed
MH-74-L18
Back filling general fill final layar for pipe trench, Storm main line Dia
Approved w/
1776 KHEP-CI-1776 800mm Zone 4B, Line 26 Zone 4B Division 31 13-Sep-2017 14-Sep-2017 10:00 AM 14-Sep-2017 B comments
Closed
Line 26, MH-125-L26 to MH-126-L26
First coat, Bituminous damp proofing installation inspection for storm
manholes, precast yard Zone 1B & Line 21 & 11
1777 KHEP-CI-1777
2B, Line 21 & 11 & 13, MH-I80-L21 and MH-I81-L21,MH-I34-L11, & 13
Zone 1B & 2B Division 33 13-Sep-2017 14-Sep-2017 3:00 PM 16-Sep-2017 A Approved Closed
MH-I41-L13 (Square)

Installation of rein forcing steel bar, embedded item and form closure Cluster 55,
1778 KHEP-CI-1778
inspection for RC Column Neck Cluster 55, BC4 BC4
NA Division 03 13-Sep-2017 14-Sep-2017 10:00 AM 14-Sep-2017 A Approved Closed

Compact test around footing general fill final layer Zone


1779 KHEP-CI-1779
3B, Cluster 48, B2
Cluster 48, B2 Zone 3B Division 31 14-Sep-2017 16-Sep-2017 10:30 AM 17-Sep-2017 A Approved Closed

Back filling general fill final layer for pipe trench, storm main line Dia
400mm Zone 2B, Approved w/
1780 KHEP-CI-1780
Line 4 & 5, MH-I10-L04 to MH-I12-L04, MH-I12-L04 to MH-I13-L04,
Line 4 & 5 Zone 2B Division 31 14-Sep-2017 16-Sep-2017 10:00 AM 16-Sep-2017 B comments
Closed
MH-I11-L05 to MH-I12-L04
Back filling general fill final layer for pipe trench, storm main line Dia
200mm Zone 3B,
Approved w/
1781 KHEP-CI-1781 Line 23 & 24, MH-2-L23 to MH-1-L23 and MH-1-L23 to MH-1-A-L23, Line 23 & 24 Zone 3B Division 31 14-Sep-2017 16-Sep-2017 10:00 AM 16-Sep-2017 B comments
Closed
MH-1-A-L23 to MH-17-L02, MH-1-L24 to MH-1-A-L24 and MH-1-A-
L24 to MH-1-L23
Back filling general fill final layer for pipe trench, storm main line Dia
200mm Zone 4B, Approved w/
1782 KHEP-CI-1782
Line 2, MH-22-L02 to MH-21-L02 and MH-21-L02 to MH-20-L02, MH-
Line 02 Zone 4B Division 31 14-Sep-2017 16-Sep-2017 10:00 AM 16-Sep-2017 B comments
Closed
20-L02 to MH-19-L02, MH-19-L02 to MH-18-L02

Back filling general fill final layer for pipe trench, storm main line Dia
800mm Zone 4B, Approved w/
1783 KHEP-CI-1783
Line 27, MH-114-L27 to MH-111a-L27 and MH-111a-L27 to MH-111-
Line 27 Zone 4B Division 31 14-Sep-2017 16-Sep-2017 10:00 AM 16-Sep-2017 B comments
Closed
L27, MH-111-L27 to MH-110A-L27, MH-110A-L27 to MH-108-L27

Inspection formwork for base & wall and concrete pouring for storm
1784 KHEP-CI-1784 manholes precast yard Zone 2B, Line 09 Line 09 & 02 Zone 2B Division 33 14-Sep-2017 16-Sep-2017 3:00PM 17-Sep-2017 E Rejected Closed
& 02, MH-I24-L09, MH-I25-L09, MH-I4-L02 & MH-I5-L02

Inspection formwork for base & wall and concrete pouring for storm
1784.1 KHEP-CI-1784-01 manholes precast yard Zone 2B, Line 09 Line 09 & 02 Zone 2B Division 33 19-Sep-2017 20-Sep-2017 10:00 AM 20-Sep-2017 A Approved Closed
& 02, MH-I24-L09, MH-I25-L09, MH-I4-L02 & MH-I5-L02

Installation of reinforcing steel bar, embedded item form closure Approved w/


1785 KHEP-CI-1785
inspection RC column first floor Cluster 68, B2
Cluster 68, B2 NA Division 03 14-Sep-2017 16-Sep-2017 3:00PM 17-Sep-2017 B comments
Closed

Concrete sampling, testing and placement inspection for RC footing


Cluster 37,
1786 KHEP-CI-1786 Cluster 37,
BC4
NA Division 03 14-Sep-2017 16-Sep-2017 9:00 AM 17-Sep-2017 A Approved Closed
BC4
Concrete sampling, testing and placement inspection for RC column
Cluster 79,
1787 KHEP-CI-1787 neck Cluster 79,
BC4
NA Division 03 14-Sep-2017 16-Sep-2017 9:00 AM 17-Sep-2017 A Approved Closed
BC4
Concrete sampling, testing and placement inspection for RC column
Cluster 60,
1788 KHEP-CI-1788 neck Cluster 60,
BC4
NA Division 03 14-Sep-2017 16-Sep-2017 9:00 AM 17-Sep-2017 A Approved Closed
BC4
Concrete sampling, testing and placement inspection for RC column
Cluster 50,
1789 KHEP-CI-1789 neck Cluster 50,
BC4
NA Division 03 14-Sep-2017 16-Sep-2017 9:00 AM 17-Sep-2017 A Approved Closed
BC4
Concrete sampling, testing and placement inspection for RC column
Cluster 22,
1790 KHEP-CI-1790 neck Cluster 22,
BC4
NA Division 03 14-Sep-2017 16-Sep-2017 9:00 AM 17-Sep-2017 A Approved Closed
BC4
Blinding Concrete sampling, testing and placement inspection for
Cluster 44,
1791 KHEP-CI-1791 grade beam
A6
NA Division 03 14-Sep-2017 16-Sep-2017 9:00 AM 17-Sep-2017 A Approved Closed
Cluster 44, A6
Blinding Concrete sampling, testing and placement inspection for
1792 KHEP-CI-1792 grade beam Cluster 20 B2 NA Division 03 14-Sep-2017 16-Sep-2017 9:00 AM 17-Sep-2017 A Approved Closed
Cluster 20, B2

First coat damproofing installation inspection for CMU, morter and


Cluster 45,
1793 KHEP-CI-1793 masonary inspection under exterior reinforced grade beam
A6
NA Division 07 14-Sep-2017 16-Sep-2017 11:00 AM 17-Sep-2017 E Rejected Closed
Cluster 45, A6

First coat damproofing installation inspection for CMU, morter and


Cluster 45,
1793.1 KHEP-CI-1793-01 masonary inspection under exterior reinforced grade beam
A6
NA Division 07 19-Sep-2017 20-Sep-2017 10:00 AM 21-Sep-2017 A Approved Closed
Cluster 45, A6

Installation of reinforcing steel bar, embedded item form closure Cluster 16


1794 KHEP-CI-1794
inspection Rcgrade beam Cluster 16, BC4 BC4
NA Division 03 14-Sep-2017 16-Sep-2017 10:00 AM 17-Sep-2017 A Approved Closed

Check the survey work, elevation and coordinate for blinding under
1795 KHEP-CI-1795 grade beam Cluster 48, Cluster 48, B2 NA Division 03 14-Sep-2017 16-Sep-2017 10:00 AM 17-Sep-2017 A Approved Closed
B2
Check the survey work, elevation and coordinate for blinding under
1796 KHEP-CI-1796 grade beam Cluster 58, Cluster 58, B2 NA Division 03 14-Sep-2017 16-Sep-2017 10:00 AM 17-Sep-2017 A Approved Closed
B2

First coat damproofing installation inspection for CMU, morter and


Cluster 09,
1797 KHEP-CI-1797 masonary inspection under exterior reinforced grade beam
BC4
NA Division 07 14-Sep-2017 16-Sep-2017 10:00 AM 17-Sep-2017 A Approved Closed
Cluster 09, BC4

Inspection formwork for base & wall and concrete pouring for storm
manholes precast yard Zone 1A &1B, Line 12, 11 &
1798 KHEP-CI-1798
Line 12, 11 & 17, MH-55-L17, MH-35-L12 and MH-36-L12, MH-37- 17
Zone 1A &1B Division 33 14-Sep-2017 16-Sep-2017 3:00PM 17-Sep-2017 E Rejected Closed
L11 and MH-38-L11
Inspection formwork for base & wall and concrete pouring for storm
manholes precast yard Zone 1A &1B, Line 12, 11 &
1798.1 KHEP-CI-1798-01
Line 12, 11 & 17, MH-55-L17, MH-35-L12 and MH-36-L12, MH-37- 17
Zone 1A &1B Division 33 19-Sep-2017 20-Sep-2017 10:00 AM 20-Sep-2017 A Approved Closed
L11 and MH-38-L11
Inspection of excavated and compaction formation for pipe trench,
Approved w/
1799 KHEP-CI-1799 storm main line Dia 800mm Zone 4B, Line 26 Zone 4B Division 31 14-Sep-2017 16-Sep-2017 11:00 AM 17-Sep-2017 B comments
Closed
Line 26, MH-120-L26 to MH-125-L26
Inspection of excavated and compaction formation for pipe trench,
storm main line Dia 500 & 600mm Zone 3B,
1800 KHEP-CI-1800
Line 27, MH-100-L27 to MH-101-L27, MH-101-L27 to MH -105-L27,
Line 27 Zone 3B Division 31 14-Sep-2017 16-Sep-2017 11:00 AM 17-Sep-2017 A Approved Closed
MH-105-L27 to MH-108-L27
Inspection of excavated and compaction formation for pipe trench,
storm main line Dia 500mm Zone 3B, Line Approved w/
1801 KHEP-CI-1801
21, MH-79-L21 to MH-I80-L21, MH-I80-L21 to MH -I81-L21, MH-I81-
Line 21 Zone 3B Division 31 14-Sep-2017 16-Sep-2017 11:00 AM 17-Sep-2017 B comments
Closed
L21 to MH-82-L21
70cm, CMU morter and masonry inspection under exterior reinforced
Cluster 21,
1802 KHEP-CI-1802 grade beam
BC4
NA Division 04 14-Sep-2017 16-Sep-2017 3:00 PM 19-Sep-2017 A Approved Closed
Cluster 21, BC4

Installation of reinforcing steel bar, embedded item and form closure Approved w/
1803 KHEP-CI-1803
inspection for RC column ground floor Cluster 66, A6
Cluster 66 NA Division 03 14-Sep-2017 16-Sep-2017 3:00 PM 17-Sep-2017 B comments
Closed

Second coat damproofing installation inspection for CMU, morter and


1804 KHEP-CI-1804 masonary inspection under exterior reinforced grade beam Cluster 51, B2 NA Division 07 14-Sep-2017 16-Sep-2017 11:00 AM 17-Sep-2017 A Approved Closed
Cluster 51, B2

Second coat damproofing installation inspection for CMU, morter and


1805 KHEP-CI-1805 masonary inspection under exterior reinforced grade beam Cluster 52, B2 NA Division 07 14-Sep-2017 16-Sep-2017 11:00 AM 17-Sep-2017 A Approved Closed
Cluster 52, B2

Cast in place concrete formwork inspection for RC grade beam


1806 KHEP-CI-1806
Cluster 75, B2
Cluster 75, B2 NA Division 03 14-Sep-2017 16-Sep-2017 10:30 AM 21-Sep-2017 A Approved Closed

Compact test around footing general fill (Final layer) Zone Cluster 43,
1807 KHEP-CI-1807
2A, Cluster 43, A6 A6
Zone 2A Division 33 14-Sep-2017 16-Sep-2017 10:30 AM 17-Sep-2017 A Approved Closed

Cast in place concrete form work inspection for RC column ground


Cluster 81,
1808 KHEP-CI-1808 floor axis (C6F3H2G5J1J-H/3-4,J-K/3-4,K1K3K4K5K6M1M3)
A6
NA Division 03 14-Sep-2017 16-Sep-2017 3:00 PM 17-Sep-2017 A Approved Closed
Cluster 81, A6

Concrete sampling, testing and placement inspection for RC grade


1809 KHEP-CI-1809 beam Cluster 4, Cluster 4, A6 NA Division 03 16-Sep-2017 17-Sep-2017 9:00 AM 17-Sep-2017 E Rejected Closed
A6
Concrete sampling, testing and placement inspection for RC grade
1809.1 KHEP-CI-1809-01 beam Cluster 4, Cluster 4, A6 NA Division 03 3-Oct-2017 4-Oct-2017 9:00 AM 5-Oct-2017 A Approved Closed
A6
Installation of reinforcing steel bar embedded item and form closure
1810 KHEP-CI-1810 inspection for RC grade beam Cluster 75, Cluster 75, B2 NA Division 03 16-Sep-2017 18-Sep-2017 3:00 PM 21-Sep-2017 A Approved Closed
B2
Cast in place concrete form work inspection for RC Stair (first flight)
1811 KHEP-CI-1811 Cluster 5, Cluster 5, B2 NA Division 03 16-Sep-2017 17-Sep-2017 10:30 AM 17-Sep-2017 A Approved Closed
B2
Installation of reinforcing steel bar embedded item and form closure
1812 KHEP-CI-1812 inspection for RC stair (first flight) Cluster Cluster 5, B2 NA Division 03 16-Sep-2017 17-Sep-2017 11:00 AM 17-Sep-2017 A Approved Closed
5, B2
Installation of reinforcing steel bar embedded item and form closure
Cluster 25,
1813 KHEP-CI-1813 inspection for RC column neck Cluster 25,
BC4
NA Division 03 16-Sep-2017 17-Sep-2017 10:00 AM 17-Sep-2017 A Approved Closed
BC4 `
Compaction test of sand bending under pipe trench storm mainline
Dia 500mm Zone 3B, Approved w/
1814 KHEP-CI-1814
Line 12, MH-79-L21 to MH-I18-L21, MH-I81-L21 to MH-I81-L21, MH-
Line 12 Zone 3B Division 31 16-Sep-2017 17-Sep-2017 11:00 AM 18-Sep-2017 B comments
Closed
I81-L21 to MH-82-L21
Compaction test of sand bending under pipe trench storm mainline
Approved w/
1815 KHEP-CI-1815 Dia 800mm Zone 4B, Line 26 Zone 4B Division 31 16-Sep-2017 17-Sep-2017 11:00 AM 18-Sep-2017 B comments
Closed
Line 26, MH-120-L26 to MH-125-L26
Installation of dam proofing surface preparation for storm manholes
(precast yard) Zone 1B & 4B, Line MH-45-
1816 KHEP-CI-1816
Line MH-45-L13, MH-44-L14 and MH-49-L15, MH-88-L22 and MH-89- L13
Zone 1B & 4B Division 33 16-Sep-2017 17-Sep-2017 3:00 PM 19-Sep-2017 A Approved Closed
L22
Inspection of reinforcing steel brand internal shutter for storm
manholes (precast yard) Zone 2B Line 3,4,5 &
1817 KHEP-CI-1817
& 4B, Line 3,4,5 & 33, MH-I7-L03, MH-I12-L04, MH-I11-L05 and MH- 33
Zone 2B & 4B Division 33 16-Sep-2017 17-Sep-2017 3:00 PM 19-Sep-2017 A Approved Closed
I122-L33

Second coat damproofing installation inspection for CMU, Morter and


Cluster 9,
1818 KHEP-CI-1818 Masonry inspection under exterior reinforced grade beam
BC4
NA Division 07 17-Sep-2017 18-Sep-2017 10:00 AM 19-Sep-2017 A Approved Closed
Cluster 9, BC4

Concrete sampling, testing and placement inspection for RC grade


Cluster 16 Approved w/
1819 KHEP-CI-1819 beam Cluster 16,
BC4
NA Division 03 17-Sep-2017 18-Sep-2017 9:00 AM 19-Sep-2017 B comments
Closed
BC4
Concrete sampling, testing and placement inspection for RC column
Approved w/
1820 KHEP-CI-1820 first floor Cluster 11 B2 NA Division 03 17-Sep-2017 18-Sep-2017 9:00 AM 19-Sep-2017 B comments
Closed
Cluster 11, B2

Inspection of excavated and compaction formation for storm


1821 KHEP-CI-1821 manholes, storm main line Line 22 Zone 3B Division 31 17-Sep-2017 18-Sep-2017 3:00 PM 19-Sep-2017 A Approved Closed
Zone 3B, Line 22, MH-83-L22, MH-84-L22 MH-87-L22 & MH-88-L22

Compaction test of sand bedding under pipe trench - Storm Maine


Line Dia 500 & 600mm Zone 2B, Approved w/
1822 KHEP-CI-1822
Line 27 MH-100-L27 to MH-101-L27, MH-101-L27 to MH-105-L27,
Line 27 Zone 2B Division 31 17-Sep-2017 18-Sep-2017 1:30 PM 19-Sep-2017 B comments
Closed
MH-105-L27 to MH-108-L27

Inspection for sand filling around pipe, sewer maine line Dia 400mm
Approved w/
1823 KHEP-CI-1823 Zone 4B, Line 33 Zone 4B Division 33 17-Sep-2017 18-Sep-2017 1:30 PM 19-Sep-2017 B comments
Closed
Line 33 MH-I121-L33 to MH-I122-L33, MH-I122-L33 to MH-I123-L33

Inspection for sand filling around pipe, storm main line Dia 500mm
1824 KHEP-CI-1824 Zone 2B, Line 20 Zone 2B Division 31 17-Sep-2017 18-Sep-2017 1:30 PM 19-Sep-2017 A Approved Closed
Line 20 MH-67-L20 to MH-68-L20
Inspection of excavated and compaction formation for pipe trench,
storm main line Dia 400mm
1825 KHEP-CI-1825
Zone 3B, Line 28 & 29, MH-I103-L29 to MH-I104-L28, MH-I104-L28
Line 28 & 29 Zone 3B Division 31 17-Sep-2017 18-Sep-2017 2:00 PM 19-Sep-2017 A Approved Closed
to MH-I105-L27, MH-I102-L28 to MH-I104-L28
Installation of reinforcing steel bar, embedded item and form closure
Cluster 37,
1826 KHEP-CI-1826 inspection for RC column neck
BC4
NA Division 03 17-Sep-2017 18-Sep-2017 10:30 AM 19-Sep-2017 A Approved Closed
Cluster 37, BC4
Installation of reinforcing steel bar, embedded item and form closure
1827 KHEP-CI-1827 inspection for RC column ground floor Cluster 4, A6 NA Division 03 17-Sep-2017 18-Sep-2017 11:00 AM 19-Sep-2017 A Approved Closed
Cluster 4, A6

70cm, CMU moter and masonary inspection under exterior reinforced Cluster 63,
1828 KHEP-CI-1828
grade beam Cluster 63, B2 B2
NA Division 04 17-Sep-2017 18-Sep-2017 10:00 AM 19-Sep-2017 A Approved Closed

Cast in place concrete form work inspection for RC grade beam


Approved w/
1829 KHEP-CI-1829 Cluster Cluster 9,B2 NA Division 03 17-Sep-2017 18-Sep-2017 2:00 PM 21-Sep-2017 B comments
Closed
9,B2
Cast in place concrete formwork inspection for RC column ground
1830 KHEP-CI-1830 floor axis (C2,J1,L3,L5,M4,M5,M6,N2,N3,N4,3-4:M-N) Cluster 81, B2 NA Division 03 17-Sep-2017 18-Sep-2017 2:00 PM 20-Sep-2017 A Approved Closed
Cluster 81, B2
Damproofing surface preparation for RC foundation & column neck
Cluster 24,
1831 KHEP-CI-1831 Cluster
BC4
NA Division 07 18-Sep-2017 19-Sep-2017 10:00 AM 20-Sep-2017 A Approved Closed
24, BC4
Concrete sampling, testing and placement inspection for RC footing
Cluster 76, Approved w/
1832 KHEP-CI-1832 Cluster 76,
BC4
NA Division 03 18-Sep-2017 19-Sep-2017 9:00 AM 20-Sep-2017 B comments
Closed
BC4

70cm, CMU motor and masonry inspection under exterior reinforced Cluster 33,
1833 KHEP-CI-1833
grade beam Cluster 33, B2 B2
NA Division 04 18-Sep-2017 19-Sep-2017 3:00 PM 20-Sep-2017 A Approved Closed

Cast in place concrete form work inspection for RC column neck


Cluster
1834 KHEP-CI-1834 Cluster
25,BC4
NA Division 03 18-Sep-2017 19-Sep-2017 10:00 AM 20-Sep-2017 A Approved Closed
25,BC4
Installation of reinforcing steel bar, embedded item and form closure
Cluster 16
1835 KHEP-CI-1835 inspection for RC column ground floor
BC4
NA Division 03 18-Sep-2017 19-Sep-2017 3:00 PM 20-Sep-2017 A Approved Closed
Cluster 16, BC4
Cast in place concrete form work inspection for RC column ground
Cluster 81,
1836 KHEP-CI-1836 floor axis (A3,E4,H1,G2,J4,L2,L6,M2,N1)
A6
NA Division 03 18-Sep-2017 19-Sep-2017 3:00 PM 21-Sep-2017 E Rejected Closed
Cluster 81, A6
Compaction test of Sand Filling Above the pipe trench and laying
warning tape, Swear Maine Line Dia 200mm Zone 4B,
Approved w/
1837 KHEP-CI-1837 Line 18 & 19, MH-3-L19 to MH-2-L19, MH-2-L19 to MH-1-L19 and Line 18 & 19 Zone 4B Division 31 18-Sep-2017 19-Sep-2017 11:00 AM 20-Sep-2017 B comments
Closed
MH-1-L19 to MH-21-L01, MH-1-L18 to MH-1-A-L18, MH-1-A-L18 to
MH-2-L19

Inspection of sand filling around pipe, Sewer main line Dia 200mm
Approved w/
1838 KHEP-CI-1838 Zone 4B, Line 17 Zone 4B Division 31 18-Sep-2017 19-Sep-2017 11:00 AM 20-Sep-2017 B comments
Closed
Line 17, MH-2-L17 to MH-2-A-L17, MH-2-A-L17 to MH-1-L17

Compaction test of Sand Filling Above the pipe trench, Swear Maine
Line Dia 400mm Zone Approved w/
1839 KHEP-CI-1839
3B, Line 28 & 29, MH-I103-L29 to MH-I104-L28, MH-I104-L28 to
Line 28 & 29 Zone 3B Division 31 18-Sep-2017 19-Sep-2017 2:00 PM 20-Sep-2017 B comments
Closed
MH-I105-L27, MH-I102-L28 to MH-I104-L28

70cm, CMU motor and masonry inspection under exterior reinforced Cluster 34,
1840 KHEP-CI-1840
grade beam Cluster 34, B2 B2
NA Division 04 19-Sep-2017 20-Sep-2017 1:30 PM 21-Sep-2017 A Approved Closed

Installation of reinforcing steel bar, embedded item and form closure


Approved w/
1841 KHEP-CI-1841 inspection for RC grade beam Cluster Cluster 8, B2 NA Division 03 19-Sep-2017 20-Sep-2017 10:00 AM 21-Sep-2017 B comments
Closed
8, B2
Check the survey work, elevation and coordinate for billnding footing
Cluster 67,
1842 KHEP-CI-1842
Cluster 67, A4 A4
NA Division 03 19-Sep-2017 20-Sep-2017 10:00 AM 21-Sep-2017 A Approved Closed

Inspection form work for base & wall storm manholes, precast yard
Zone 2B & 4B, Line 3,4,5 &
1843 KHEP-CI-1843
Line 3,4,5 & 33, MH-I7-L03, MH-I12-L04, MH-I11-L05 & MH-I122- 33
Zone 2B & 4B Division 33 19-Sep-2017 20-Sep-2017 3:00 PM 21-Sep-2017 A Approved Closed
L33
Inspection of dam proofing surface preparation for strom manholes,
(Precast yard) Zone 2B & 4B,
1844 KHEP-CI-1844
Line 7 & 22, MH-19-L07 and MH-20-L07, MH-83-L22 & MH-84-L22,
Line 7 & 22 Zone 2B & 4B Division 31 19-Sep-2017 20-Sep-2017 2:00 PM 21-Sep-2017 A Approved Closed
MH-87-L22
Inspection of Reinforcement steel bar and internal Shutter for storm
manholes (Precast yard) Line 4, 27, 32 Zone 2B,3B &
1845 KHEP-CI-1845
Zone 2B,3B & 4B, Line 4, 27, 32 & 33, MH-I10-L04, MH--I98-L27, & 33 4B
Division 33 19-Sep-2017 20-Sep-2017 3:00 PM 21-Sep-2017 A Approved Closed
MH-I113-L32 and MH-I121-L33
First coat, Bituminous damp proofing installation inspection for storm
manholes, precast yard Zone 1B & Line 13, 14,
1846 KHEP-CI-1846
4B, Line 13, 14, 15 & 22, MH-45-L13, MH-44-L14 and MH-49- 15 & 22
Zone 1B & 4B Division 33 19-Sep-2017 20-Sep-2017 3:00 PM 21-Sep-2017 A Approved Closed
L15,MH-88-L22 and MH-89-L22
Cast in place concrete formwork inspection for RC roof slab Cluster
1847 KHEP-CI-1847
2, A6
Cluster 02 A6 NA Division 03 19-Sep-2017 20-Sep-2017 11:00 AM 24-Sep-2017 E Rejected Closed

Cast in place concrete formwork inspection for RC roof slab Cluster


1847.1 KHEP-CI-1847-01
2, A6
Cluster 02 A6 NA Division 03 25-Sep-2017 26-Sep-2017 10:00 AM 28-Sep-2017 A Approved Closed

Building concrete sampling, testing and placement inspection for


1848 KHEP-CI-1848 manholes, Storm main line Zone Line 22 Zone 3B Division 31 19-Sep-2017 20-Sep-2017 3:00 PM 24-Sep-2017 A Approved Closed
3B, Line 22, MH-83-L22, MH-84-L22, MH-87-L22 and MH-88-L22

Inspection of excavated compaction formation for pipe trench, storm


main line Dia 400mm Zone 2B, Line 9,
1849 KHEP-CI-1849
MH-I22-L09 to MH-I23-L09, MHI23-L09 to MH-I24-L09, MH-I24-L09
Line 9 Zone 2B Division 31 19-Sep-2017 20-Sep-2017 2:00 PM 21-Sep-2017 A Approved Closed
to MH-I25-L09

First coat dam proofing installation inspection for CMU, morter and
1850 KHEP-CI-1850 masonary inspection under exterior reinforced grade beam Cluster 35, B2 NA Division 07 19-Sep-2017 20-Sep-2017 1:30 PM 21-Sep-2017 A Approved Closed
Cluster 35, B2

Cast in place concrete form work inspection for RC first floor slab &
Approved w/
1851 KHEP-CI-1851 stair Cluster 17 B2 NA Division 03 19-Sep-2017 20-Sep-2017 10:30 AM 24-Sep-2017 B comments
Closed
Cluster 17, B2
Cast in place concrete form work inspection for RC Column first floor
1852 KHEP-CI-1852 Cluster 68, B2 NA Division 03 20-Sep-2017 21-Sep-2017 10:00 AM 24-Sep-2017 A Approved Closed
Cluster 68, B2
Cast in place concrete form work inspection for RC Roof Slab
1853 KHEP-CI-1853
Cluster 15, B2
Cluster 15 B2 NA Division 03 20-Sep-2017 21-Sep-2017 10:00 AM 24-Sep-2017 E Rejected Closed

Cast in place concrete form work inspection for RC Roof Slab


1853.1 KHEP-CI-1853-01
Cluster 15, B2
Cluster 15 B2 NA Division 03 27-Sep-2017 28-Sep-2017 11:00 AM 1-Oct-2017 A Approved Closed

Cast in place concrete form work inspection for RC Column Neck


Cluster 26,
1854 KHEP-CI-1854 Cluster 26,
BC4
NA Division 03 20-Sep-2017 21-Sep-2017 3:00 PM 24-Sep-2017 A Approved Closed
BC4
Cast in place concrete form work inspection for RC Grade Beam
1855 KHEP-CI-1855 Cluster 19, Cluster 19 B2 NA Division 03 20-Sep-2017 21-Sep-2017 1:30 PM 24-Sep-2017 E Rejected Closed
B2
Cast in place concrete form work inspection for RC Grade Beam
1855.1 KHEP-CI-1855-01 Cluster 19, Cluster 19 B2 NA Division 03 26-Sep-2017 27-Sep-2017 10:30 AM 28-Sep-2017 A Approved Closed
B2
Cast in place concrete form work inspection for RC Footing Cluster 77,
1856 KHEP-CI-1856
Cluster 77, BC4 BC4
NA Division 03 20-Sep-2017 21-Sep-2017 10:00 AM 24-Sep-2017 E Rejected Closed

Cast in place concrete form work inspection for RC Footing Cluster 77,
1856.1 KHEP-CI-1856-01
Cluster 77, BC4 BC4
NA Division 03 26-Sep-2017 27-Sep-2017 10:00 AM 28-Sep-2017 A Approved Closed

Installation of reinforcing steel bar, embedded item and form closure


Cluster 77,
1857 KHEP-CI-1857 inspection for RC footing
BC4
NA Division 03 20-Sep-2017 21-Sep-2017 10:30 AM 24-Sep-2017 A Approved Closed
Cluster 77, BC4
Installation of reinforcing steel bar, embedded item and form closure
1858 KHEP-CI-1858 inspection for RC First floor Slab Cluster 17 B2 NA Division 03 20-Sep-2017 21-Sep-2017 11:00 AM 24-Sep-2017 E Rejected Closed
Cluster 17, B2
Installation of reinforcing steel bar, embedded item and form closure
1858.1 KHEP-CI-1858-01 inspection for RC First floor Slab Cluster 17 B2 NA Division 03 28-Sep-2017 30-Sep-2017 11:00 AM 4-Oct-2017 A Approved Closed
Cluster 17, B2
Check the survey work, elevation and coordinate for billnding Under
grade beam Cluster 43,
1859 KHEP-CI-1859
Cluster 43, A6 A6
NA Division 03 20-Sep-2017 21-Sep-2017 2:00 PM 24-Sep-2017 A Approved Closed

Cast in place concrete formwork inspection for RC column ground


Approved w/
1860 KHEP-CI-1860 floor axis (H5,H6,J2,J3,K4,K5,K6,L3,L4,L5,M4,M5,M6,N2,N3) Cluster 4, A6 NA Division 03 20-Sep-2017 21-Sep-2017 1:30 PM 24-Sep-2017 B comments
Closed
Cluster 4, A6

Second coat dam proofing installation inspection for CMU, Morter and
Cluster 45,
1861 KHEP-CI-1861 Masonry inspection under exterior reinforced grade beam
A6
NA Division 07 20-Sep-2017 21-Sep-2017 10:00 AM 24-Sep-2017 A Approved Closed
Cluster 45, A6

70cm, CMU motor and masonry inspection under exterior reinforced Cluster 65,
1862 KHEP-CI-1862
grade beam Cluster 65, A6 A6
NA Division 04 20-Sep-2017 21-Sep-2017 2:00 PM 24-Sep-2017 A Approved Closed

Inspection of sand filling around pipe, Sewer main line Dia 500mm
Zone 3B, Approved w/
1863 KHEP-CI-1863
Line 21, MH-79-L21 to MH-I80-L21 and MH-I80-L21 to MH-I81-L21
Line 21 Zone 3B Division 31 20-Sep-2017 21-Sep-2017 11:00 AM 24-Sep-2017 B comments
Closed
and MH-I81-L21 to MH-I82-L21
Inspection of concrete pouring and sampling for base & wall for
strom manholes, (Precast yard) Line 3 & 4 &
1864 KHEP-CI-1864
Zone 2B & 4B, Line 3 & 4 & 5 & 33, MH-I7-L03 and MH-I12-L04, 5 & 33
Zone 2B & 4B Division 33 21-Sep-2017 23-Sep-2017 3:00 PM 24-Sep-2017 A Approved Closed
MH-I11-L05 & MH-I122-L33
Compact test around footing general fill (Final layer) Zone Cluster 9,
1865 KHEP-CI-1865
1B, Cluster 9, BC4 BC4
Zone 1B Division 31 21-Sep-2017 23-Sep-2017 10:30 AM 24-Sep-2017 A Approved Closed

Compact test around footing general fill (Final layer) Zone


1866 KHEP-CI-1866
3B, Cluster 51, B2
Cluster 51, B2 Zone 3B Division 31 21-Sep-2017 23-Sep-2017 10:30 AM 24-Sep-2017 A Approved Closed

Compact test around footing general fill (Final layer) Zone


1867 KHEP-CI-1867
3B, Cluster 52, B2
Cluster 52, B2 Zone 3B Division 31 21-Sep-2017 23-Sep-2017 10:30 AM 24-Sep-2017 A Approved Closed

Compact test around footing general fill (Final layer) Zone


1868 KHEP-CI-1868
3B, Cluster 54, B2
Cluster 54, B2 Zone 3B Division 31 21-Sep-2017 23-Sep-2017 10:30 AM 24-Sep-2017 A Approved Closed

Back filling general fill final layer for pipe trench, storm main line Dia
Approved w/
1869 KHEP-CI-1869 400mm Zone 2B, Line 2 Zone 2B Division 31 21-Sep-2017 23-Sep-2017 10:00 AM 24-Sep-2017 B comments
Closed
Line 2, MH-I4-L02 to MH-I5-L02 and MH-I5-L02 to MH-6-L01

Back filling general fill final layer for pipe trench, Sewer main line Dia
Approved w/
1870 KHEP-CI-1870 200mm Zone 3B, Line 1 Zone 3B Division 31 21-Sep-2017 23-Sep-2017 10:00 AM 24-Sep-2017 B comments
Closed
Line 1, MH-16-L01 to MH-15-L01
Termite control surface preparation, installation and final inspection
1871 KHEP-CI-1871 for Grade Beam Cluster 48, B2 NA Division 03 21-Sep-2017 23-Sep-2017 10:00 AM 24-Sep-2017 A Approved Closed
Cluster 48, B2
Termite control surface preparation, installation and final inspection
1872 KHEP-CI-1872 for Grade Beam Cluster 58, B2 NA Division 03 21-Sep-2017 23-Sep-2017 10:00 AM 24-Sep-2017 A Approved Closed
Cluster 58, B2
Check the survey work, elevation and coordinate for blinding under
1873 KHEP-CI-1873 grade beam Cluster 54, Cluster 54, B2 NA Division 03 21-Sep-2017 23-Sep-2017 10:00 AM 24-Sep-2017 E Rejected Closed
B2
Check the survey work, elevation and coordinate for blinding under
1873.1 KHEP-CI-1873-01 grade beam Cluster 54, Cluster 54, B2 NA Division 03 26-Sep-2017 27-Sep-2017 10:00 AM 28-Sep-2017 A Approved Closed
B2
Concrete sampling, testing and placement inspection for RC Stair
1874 KHEP-CI-1874 (First Flight) Cluster 5, A6 NA Division 03 21-Sep-2017 23-Sep-2017 9:00 AM 24-Sep-2017 A Approved Closed
Cluster 5, A6
Concrete sampling, testing and placement inspection for RC Footing
Cluster 56,
1875 KHEP-CI-1875 Cluster 56,
BC4
NA Division 03 21-Sep-2017 23-Sep-2017 9:00 AM 24-Sep-2017 A Approved Closed
BC4
Concrete sampling, testing and placement inspection for RC Column
Cluster 36,
1876 KHEP-CI-1876 Neck
BC4
NA Division 03 21-Sep-2017 23-Sep-2017 9:00 AM 24-Sep-2017 A Approved Closed
Cluster 36, BC4

Second coat damproofing installation inspection for CMU, Morter and


1877 KHEP-CI-1877 Masonry inspection under exterior reinforced grade beam Cluster 35, B2 NA Division 07 21-Sep-2017 23-Sep-2017 10:30 AM 24-Sep-2017 A Approved Closed
Cluster 35, B2

Cast in place concrete form work inspection for RC First Floor Slab &
1878 KHEP-CI-1878 Stair Cluster 5, B2 NA Division 03 21-Sep-2017 23-Sep-2017 2:30 PM 25-Sep-2017 E Rejected Closed
Cluster 5, B2
Cast in place concrete form work inspection for RC First Floor Slab &
1878.1 KHEP-CI-1878-01 Stair Cluster 5, B2 NA Division 03 28-Sep-2017 30-Sep-2017 10:30 AM 5-Oct-2017 A Approved Closed
Cluster 5, B2
Concrete sampling, testing and placement inspection for RC Grade
1879 KHEP-CI-1879 Beam Cluster 75, B2 NA Division 03 21-Sep-2017 23-Sep-2017 9:00 AM 24-Sep-2017 A Approved Closed
Cluster 75, B2
Cast in place concrete form work inspection for RC Column (First
1880 KHEP-CI-1880 Floor) Cluster 10 B2 NA Division 03 21-Sep-2017 23-Sep-2017 2:30 PM 24-Sep-2017 A Approved Closed
Cluster 10, B2
First coat, Bituminous damp proofing installation inspection for storm
manholes, precast yard Zone 2B &
1881 KHEP-CI-1881
4B, Line 7 & 22, MH-19-L07 and MH-20-L07,MH-83-L22, MH-84-L22
Line 7 & 22 Zone 2B & 4B Division 31 21-Sep-2017 23-Sep-2017 2:00 PM 24-Sep-2017 A Approved Closed
and MH-87-L22
Inspection of dam proofing surface preparation for strom manholes,
(Precast yard) Zone 1B & 2B, Line 9 & 13 & Approved w/
1882 KHEP-CI-1882
Line 9 & 13 & 16, MH-I22-L09 and MH-I23-L09, MH-I42-L13 & MH- 16
Zone 1B & 2B Division 33 21-Sep-2017 23-Sep-2017 3:00 PM 24-Sep-2017 B comments
Closed
I53-L16
Inspection of excavated compaction formation for pipe trench, storm
Approved w/
1883 KHEP-CI-1883 main line Dia 400mm Zone 2B, Line 1, Line 1 Zone 2B Division 31 21-Sep-2017 23-Sep-2017 11:00 AM 25-Sep-2017 B comments
Closed
MH-6-L01 to MH-I8-L01
Compaction test of sand bedding under pipe trench - Storm Maine
Line Dia 400mm Zone 2B,
1884 KHEP-CI-1884
Line 9, MH-I22-L09 to MH-I23-L09, MH-I23-L09 to MH-I24-L09, MH-
Line 9 Zone 2B Division 31 21-Sep-2017 23-Sep-2017 2:00 PM 24-Sep-2017 A Approved Closed
I24-L09 to MH-I25-L09
Inspection of sand filling around pipe, Storm main line Dia 500 &
600mm Approved w/
1885 KHEP-CI-1885
Zone 3B, Line 27, MH-100-L27 to MH-101-L27 and MH-101-L27 to
Line 27 Zone 3B Division 31 21-Sep-2017 23-Sep-2017 2:00 PM 24-Sep-2017 B comments
Closed
MH-105-L27 and MH-105-L27 to MH-108-L27
Compaction test of Sand Filling Above the pipe trench and laying
warning tape Swear Maine Line Dia 200mm Approved w/
1886 KHEP-CI-1886
Zone 4B, Line 17, MH-2-L17 to MH-2a-L17, MH-
Line 17 Zone 4B Division 31 21-Sep-2017 23-Sep-2017 11:30 AM 24-Sep-2017 B comments
Closed
2a-L17 to MH-1-L17
Compaction test of Sand Filling Above the pipe trench and laying
1887 KHEP-CI-1887 warning tape Storm Maine Line Dia 500mm Line 20 Zone 3B Division 31 21-Sep-2017 23-Sep-2017 11:30 AM 24-Sep-2017 A Approved Closed
Zone 3B, Line 20, MH-67-L20 to MH-68-L20
Installation Inspection of Precast Storm Drainage manholes
1888 KHEP-CI-1888 Zone 1B, Line 11 & Line 11 & 13 Zone 1B Division 33 21-Sep-2017 23-Sep-2017 11:00 AM 25-Sep-2017 A Approved Closed
13, MH-I34-L11 and MH-I40-L13 and MH-I41-L13
Cast in place concrete form work inspection for RC Grade Beam
1889 KHEP-CI-1889 Cluster 61, Cluster 61, B2 NA Division 03 21-Sep-2017 23-Sep-2017 10:00 AM 25-Sep-2017 A Approved Closed
B2
First Coat, Damp Proofing Installation Inspection for RC footing &
Cluster 24,
1890 KHEP-CI-1890 Column Neck
BC4
NA Division 03 21-Sep-2017 23-Sep-2017 1:30 PM 24-Sep-2017 A Approved Closed
Cluster 24, BC4

70cm, CMU motor and masonry inspection under exterior reinforced


1891 KHEP-CI-1891
grade beam Cluster 64, B2
Cluster 64, B2 NA Division 04 23-Sep-2017 24-Sep-2017 10:00 AM 25-Sep-2017 A Approved Closed
Cast in place concrete form work inspection for RC Column Neck
Cluster 37,
1892 KHEP-CI-1892 Cluster 37,
BC4
NA Division 03 23-Sep-2017 24-Sep-2017 10:00 AM 25-Sep-2017 A Approved Closed
BC4
Concrete sampling, testing and placement inspection for RC Grade
1893 KHEP-CI-1893 Beam Cluster 8, B2 NA Division 03 23-Sep-2017 24-Sep-2017 9:00 AM 25-Sep-2017 E Rejected Closed
Cluster 8, B2
Concrete sampling, testing and placement inspection for RC Grade
1893.1 KHEP-CI-1893-01 Beam Cluster 8, B2 NA Division 03 3-Oct-2017 4-Oct-2017 9:00 AM 5-Oct-2017 A Approved Closed
Cluster 8, B2
Check the survey work, elevation and coordinate for blinding under
Cluster 9,
1894 KHEP-CI-1894 grade beam Cluster 9,
BC4
NA Division 03 23-Sep-2017 24-Sep-2017 3:00 PM 25-Sep-2017 E Rejected Closed
BC4
Check the survey work, elevation and coordinate for blinding under
Cluster 9,
1894.1 KHEP-CI-1894-01 grade beam Cluster 9,
BC4
NA Division 03 26-Sep-2017 27-Sep-2017 10:00 AM 28-Sep-2017 A Approved Closed
BC4
Building concrete sampling, testing and placement inspection for
1895 KHEP-CI-1895 Grade Beam Cluster Cluster 48, B2 NA Division 03 23-Sep-2017 24-Sep-2017 9:00 AM 28-Sep-2017 A Approved Closed
48, B2
Building concrete sampling, testing and placement inspection for
1896 KHEP-CI-1896 Grade Beam Cluster Cluster 58, B2 NA Division 03 23-Sep-2017 24-Sep-2017 9:00 AM 28-Sep-2017 A Approved Closed
58, B2
Installation of reinforcing steel bar, embedded item and form closure
1897 KHEP-CI-1897 inspection for RC Grade Beam Cluster 19 B2 NA Division 03 23-Sep-2017 24-Sep-2017 2:00 PM 25-Sep-2017 A Approved Closed
Cluster 19, B2
Cast in place concrete formwork inspection for RC column ground
floor axis
1898 KHEP-CI-1898
(A2,A3,B4,B5,B6,C3,C4,D4,D5,D6,E2,E3,F4,F5,F6,G3,G4,H4)
Cluster 4, A6 NA Division 03 23-Sep-2017 24-Sep-2017 3:00 PM 25-Sep-2017 E Rejected Closed
Cluster 4, A6
Cast in place concrete formwork inspection for RC column ground
floor axis
1898.1 KHEP-CI-1898-01
(A2,A3,B4,B5,B6,C3,C4,D4,D5,D6,E2,E3,F4,F5,F6,G3,G4,H4)
Cluster 4, A6 NA Division 03 27-Sep-2017 28-Sep-2017 10:00 AM 30-Sep-2017 A Approved Closed
Cluster 4, A6
Cast in place concrete formwork inspection for RC column ground
floor axis (B-C/5,C6,C-D/4,D6,E5,F1,F2,F3,F6,F-G/4,F- Cluster 16
1899 KHEP-CI-1899
G/5,G1,G2,G4,G5,G6,G-H/5,H2,H3,H6,J5) BC4
NA Division 03 23-Sep-2017 24-Sep-2017 3:00 PM 25-Sep-2017 E Rejected Closed
Cluster 16, BC4
Cast in place concrete formwork inspection for RC column ground
floor axis (B-C/5,C6,C-D/4,D6,E5,F1,F2,F3,F6,F-G/4,F- Cluster 16
1899.1 KHEP-CI-1899-01
G/5,G1,G2,G4,G5,G6,G-H/5,H2,H3,H6,J5) BC4
NA Division 03 27-Sep-2017 28-Sep-2017 10:00 AM 30-Sep-2017 A Approved Closed
Cluster 16, BC4
Check the survey work, elevation and coordinate for blinding under
1900 KHEP-CI-1900 grade beam Cluster 51, Cluster 51, B2 NA Division 03 23-Sep-2017 24-Sep-2017 10:00 AM 24-Sep-2017 A Approved Closed
B2
Check the survey work, elevation and coordinate for blinding under
1901 KHEP-CI-1901 grade beam Cluster 52, Cluster 52, B2 NA Division 03 23-Sep-2017 24-Sep-2017 10:00 AM 24-Sep-2017 A Approved Closed
B2
Inspection of excavated compaction formation for pipe trench, storm
main line Dia 500mm Zone 3B, Line Approved w/
1902 KHEP-CI-1902
27, MH-I97-L27 to MH-I98-L27, MHI98-L27 to MH-I99-L27, MH-I99-
Line 27 Zone 3B Division 31 23-Sep-2017 24-Sep-2017 11:00 AM 25-Sep-2017 B comments
Closed
L27 to MH-100-L27
Compaction test of sand bedding under pipe trench - Sewer Maine
Approved w/
1903 KHEP-CI-1903 Line Dia 200mm Zone 3B, Line 27 Zone 3B Division 31 23-Sep-2017 24-Sep-2017 11:00 AM 25-Sep-2017 B comments
Closed
Line 27, MH-15-L01 to MH-14-L01
Inspection of sand filling around pipe, Storm main line Dia 500mm
Approved w/
1904 KHEP-CI-1904 Zone 3B, Line 26 Zone 3B Division 31 23-Sep-2017 24-Sep-2017 11:30 AM 25-Sep-2017 B comments
Closed
Line 26, MH-120-L26 to MH-125-L26
Compaction test of Sand Filling Above the pipe trench and laying
warning tape Storm Maine Line Dia 400mm Approved w/
1905 KHEP-CI-1905
Zone 4B, Line 33, MH-I121-L33 to MH-I122-L33
Line 33 Zone 4B Division 31 23-Sep-2017 24-Sep-2017 11:30 AM 25-Sep-2017 B comments
Closed
and MH-I122-L33 to MH-I123-L33
Inspection formwork for base & wall and concrete pouring for storm
manholes precast yard Zone 2B &3B & Line 4 & 27 & Zone 2B &3B &
1906 KHEP-CI-1906
4B, Line 4 & 27 & 32 & 33, MH-I10-L04, MH-I98-L27 and MH-I113- 32 & 33 4B
Division 33 23-Sep-2017 24-Sep-2017 10:00 AM 25-Sep-2017 A Approved Closed
L32, MH-I121-L33
Inspection of reinforcing steel bar and internal shutter for storm
manholes (precast yard) Zone 2B Line 7 & 20 &
1907 KHEP-CI-1907
& 3B, Line 7 & 20 & 21, MH-27-L07 and MH-67-L20 and MH-68-L20 21
Zone 2B & 3B Division 33 23-Sep-2017 24-Sep-2017 3:00 PM 26-Sep-2017 A Approved Closed
and MH-69-L20 and MH-77-L21 and MH-78-L21

Installation of reinforcing steel bar, embedded item and form closure


1908 KHEP-CI-1908 inspection for RC Roof Slab Cluster 02 A6 NA Division 03 23-Sep-2017 24-Sep-2017 10:00 AM 25-Sep-2017 A Approved Closed
Cluster 2, A6

First coat, Damp proofing installation inspection for RC Footing & Cluster 24,
1909 KHEP-CI-1909
Column Neck Cluster 24, BC4 BC4
NA Division 07 24-Sep-2017 25-Sep-2017 10:00 AM 26-Sep-2017 A Approved Closed

Installation of reinforcing steel bar, embedded item and form closure


Cluster 56,
1910 KHEP-CI-1910 inspection for RC Column Neck
BC4
NA Division 03 24-Sep-2017 25-Sep-2017 10:00 AM 26-Sep-2017 A Approved Closed
Cluster 56, BC4
Concrete sampling, testing and placement inspection for RC Column
Cluster 26,
1911 KHEP-CI-1911 Neck
BC4
NA Division 03 24-Sep-2017 25-Sep-2017 9:00 AM 27-Sep-2017 E Rejected Closed
Cluster 26, BC4
Concrete sampling, testing and placement inspection for RC Column
Cluster 26,
1911.1 KHEP-CI-1911-01 Neck
BC4
NA Division 03 15-Nov-2017 16-Nov-2017 9:00 AM 16-Nov-2017 A Approved Closed
Cluster 26, BC4
Concrete sampling, testing and placement inspection for RC Column
1912 KHEP-CI-1912 (First Floor) Cluster 10 B2 NA Division 03 24-Sep-2017 25-Sep-2017 9:00 AM 27-Sep-2017 E Rejected Closed
Cluster 10, B2
Concrete sampling, testing and placement inspection for RC Column
1912.1 KHEP-CI-1912-01 (First Floor) Cluster 10 B2 NA Division 03 3-Oct-2017 4-Oct-2017 9:00 AM 5-Oct-2017 A Approved Closed
Cluster 10, B2
Concrete sampling, testing and placement inspection for RC Column
1913 KHEP-CI-1913 (First Floor) Cluster 68, B2 NA Division 03 24-Sep-2017 25-Sep-2017 9:00 AM 27-Sep-2017 E Rejected Closed
Cluster 68, B2
Concrete sampling, testing and placement inspection for RC Column
1913.1 KHEP-CI-1913-01 (First Floor) Cluster 68, B2 NA Division 03 3-Oct-2017 4-Oct-2017 9:00 AM 5-Oct-2017 A Approved Closed
Cluster 68, B2
Compaction test of Sand Filling Above the pipe trench and laying
warning tape Storm Maine Line Dia 500mm
1914 KHEP-CI-1914
Zone 3B, Line 21, MH-79-L21 to MH-I80-L21 and
Line 21 Zone 3B Division 31 24-Sep-2017 25-Sep-2017 11:30 AM 26-Sep-2017 A Approved Closed
MH-I80-L21 to MH-I81-L21 and MH-I81-L21 to MH-82-L21
Compaction test of sand bedding under pipe trench - Storm Maine
Line Dia 500mm Zone 3B, Approved w/
1915 KHEP-CI-1915
Line 27, MH-197-L27 to MH-I98-L27 and MH-198-L27 to MH-I99-L27
Line 27 Zone 3B Division 31 24-Sep-2017 25-Sep-2017 11:00 AM 26-Sep-2017 B comments
Closed
and MH-199-L27 to MH-100-L27
Inspection of sand filling around pipe, Storm main line Dia 400mm
Zone 3B, Approved w/
1916 KHEP-CI-1916
Line 29 & 28, MH-I103-L29 to MH-I104-L28 and MH-I104-L28 to
Line 29 & 28 Zone 3B Division 31 24-Sep-2017 25-Sep-2017 1:30 PM 26-Sep-2017 B comments
Closed
MH-105-L27 and MH-I102-L28 to MH-I104-L28
Compaction test of sand bedding under pipe trench - Storm Maine
Approved w/
1917 KHEP-CI-1917 Line Dia 400mm Zone 2B, Line 1 Zone 2B Division 31 24-Sep-2017 25-Sep-2017 11:00 AM 26-Sep-2017 B comments
Closed
Line 1, MH-6-L01 to MH-I8-L01
First coat, Bituminous damp proofing installation inspection for storm
manholes, precast yard Zone 1B & Line 9 & 13 &
1918 KHEP-CI-1918
2B, Line 9 & 13 & 16, MH-I22-L09 and MH-I23-L09,MH-I42-L13, MH- 16
Zone 1B & 2B Division 33 24-Sep-2017 25-Sep-2017 3:00 PM 26-Sep-2017 A Approved Closed
I53-L16
Compaction test of Sand Filling Above the pipe trench and laying
warning tape Storm Maine Line Dia 600mm Approved w/
1919 KHEP-CI-1919
Zone 3B, Line 22, MH-91-L22 to MH-91a-L22 and
Line 22 Zone 3B Division 33 24-Sep-2017 25-Sep-2017 11:30 AM 26-Sep-2017 B comments
Closed
MH-91a-L22 to MH-92-L21
Installation of reinforcing steel bar, embedded item and form closure
1920 KHEP-CI-1920 inspection for RC Column Ground Floor Cluster 8, B2 NA Division 03 24-Sep-2017 25-Sep-2017 2:00 PM 26-Sep-2017 A Approved Closed
Cluster 8, B2

Check the survey work, elevation and coordinate for blinding Footing Cluster 40,
1921 KHEP-CI-1921
Cluster 40, BC4 BC4
NA Division 03 24-Sep-2017 25-Sep-2017 10:00 AM 25-Sep-2017 A Approved Closed

Damproofing surface preparation for RC foundation & column neck


Cluster 50,
1922 KHEP-CI-1922 Cluster
BC4
NA Division 07 24-Sep-2017 25-Sep-2017 10:00 AM 28-Sep-2017 A Approved Closed
50, BC4
Termite control surface preparation, installation and final inspection
1923 KHEP-CI-1923 for Slab on Grade Cluster 69, B2 NA Division 03 24-Sep-2017 25-Sep-2017 10:00 AM 24-Sep-2017 E Rejected Closed
Cluster 69, B2, Mockup
Termite control surface preparation, installation and final inspection
1923.1 KHEP-CI-1923-01 for Slab on Grade (Lift Side) Cluster 69, B2 NA Division 03 28-Sep-2017 30-Sep-2017 10:00 AM 28-Sep-2017 A Approved Closed
Cluster 69, B2, Mockup
Installation of reinforcing steel bar, embedded item and form closure
1924 KHEP-CI-1924 inspection for RC Slab on Grade Cluster 69, B2 NA Division 03 24-Sep-2017 25-Sep-2017 10:00 AM 24-Sep-2017 E Rejected Closed
Cluster 69, B2, Mockup
Installation of reinforcing steel bar, embedded item and form closure
1924.1 KHEP-CI-1924-01 inspection for RC Slab on Grade (Lift Side) Cluster 69, B2 NA Division 03 28-Sep-2017 30-Sep-2017 10:00 AM 28-Sep-2017 A Approved Closed
Cluster 69, B2, Mockup
First coat dam proofing installation inspection for CMU, Morter and
1925 KHEP-CI-1925 Masonry inspection under exterior reinforced grade beam Cluster 72, B2 NA Division 07 25-Sep-2017 26-Sep-2017 1:30 PM 27-Sep-2017 A Approved Closed
Cluster 72, B2
First coat dam proofing installation inspection for CMU, Morter and
1926 KHEP-CI-1926 Masonry inspection under exterior reinforced grade beam Cluster 63, B2 NA Division 07 25-Sep-2017 26-Sep-2017 2:00 PM 27-Sep-2017 A Approved Closed
Cluster 63, B2
First coat dam proofing installation inspection for CMU, Morter and
1927 KHEP-CI-1927 Masonry inspection under exterior reinforced grade beam Cluster 27, B2 NA Division 07 25-Sep-2017 26-Sep-2017 2:30 PM 27-Sep-2017 A Approved Closed
Cluster 27, B2

Inspection of excavated compaction formation for pipe trench, storm


1928 KHEP-CI-1928 main line Dia 400mm Zone 3B, Line 23 Line 23 & 31 Zone 3B Division 31 25-Sep-2017 26-Sep-2017 11:00 AM 28-Sep-2017 A Approved Closed
& 31, MH-I109-L31 to MH-I10A-L27, MHI85-L23 to MH-87-L22

Compaction test Excavated formation level bottom of foundation


Cluster 39,
1929 KHEP-CI-1929 Zone 2B, Cluster 39,
BC6
Zone 2B Division 31 25-Sep-2017 26-Sep-2017 1:30 PM 28-Sep-2017 A Approved Closed
BC6
Back filling general fill final layer for pipe trench, Sewer main line Dia
200mm Zone 3B,
Line 25 & 26, MH-4-L26 to MH-3-L26 and MH-3-L26 to MH-2-L26
1930 KHEP-CI-1930
and MH-2-L26 to MH-1-L26 and MH-1-L26 to MH-1A-L26 and MH-1A-
Line 25 & 26 Zone 3B Division 31 25-Sep-2017 26-Sep-2017 10:00 AM 27-Sep-2017 A Approved Closed
L26 to MH-15-L02 and MH-1-L25 to MH-1A-L25 and MH-1A-L25 to
MH-1-L26
Inspection form work for neck columns of cluster 78 Buillding on
1931 KHEP-CI-1931 ground floor level Cluster 78 NA Division 03 25-Sep-2017 26-Sep-2017 8:30 AM 27-Sep-2017 A Approved Closed
Cluster 78
Inspection form work for base & wall and concrete pouring for storm
manholes precast yard Zone 2B &3B, Line 7 & 20 &
1932 KHEP-CI-1932
Line 7 & 20 & 21, MH-27-L07, MH-67-L20 and MH-68-L20, MH-69- 21
Zone 2B &3B Division 33 25-Sep-2017 26-Sep-2017 3:00 PM 27-Sep-2017 A Approved Closed
L20 and MH-77-L21 and MH-78-L21
Compaction test of Sand Filling Above the pipe trench and laying
warning tape Storm Maine Line Dia 600 & 500mm
1933 KHEP-CI-1933 Zone 3B, Line 27, MH-100-L27 to MH-101- Line 27 Zone 3B Division 31 26-Sep-2017 27-Sep-2017 11:30 AM 28-Sep-2017 A Approved Closed
L27 and MH-101-L27 to MH-105-L27 and MH-105-L27 to MH-108-
L27
Termite control surface preparation, installation and final inspection
Cluster 67,
1934 KHEP-CI-1934 for Footing Cluster
A4
NA Division 03 26-Sep-2017 27-Sep-2017 10:00 AM 27-Sep-2017 A Approved Closed
67, A4

Second coat dam proofing installation inspection for CMU, Morter and
1935 KHEP-CI-1935 Masonry inspection under exterior reinforced grade beam Cluster 72, B2 NA Division 07 26-Sep-2017 27-Sep-2017 10:30 AM 28-Sep-2017 A Approved Closed
Cluster 72, B2

Second coat dam proofing installation inspection for CMU, Morter and
1936 KHEP-CI-1936 Masonry inspection under exterior reinforced grade beam Cluster 63, B2 NA Division 07 26-Sep-2017 27-Sep-2017 10:00 AM 28-Sep-2017 A Approved Closed
Cluster 63, B2

Second coat dam proofing installation inspection for CMU, Morter and
1937 KHEP-CI-1937 Masonry inspection under exterior reinforced grade beam Cluster 27, B2 NA Division 07 26-Sep-2017 27-Sep-2017 10:30 AM 28-Sep-2017 A Approved Closed
Cluster 27, B2

Concrete sampling, testing and placement inspection for RC Column


Cluster 81, Approved w/
1938 KHEP-CI-1938 (Ground Floor)
A6
NA Division 03 26-Sep-2017 27-Sep-2017 9:00 AM 28-Sep-2017 B comments
Closed
Cluster 81, A6
Concrete sampling, testing and placement inspection for RC Grade
Approved w/
1939 KHEP-CI-1939 Beam Cluster 19 B2 NA Division 03 26-Sep-2017 27-Sep-2017 9:00 AM 28-Sep-2017 B comments
Closed
Cluster 19, B2
Concrete sampling, testing and placement inspection for RC Footing
Cluster 77, Approved w/
1940 KHEP-CI-1940 Cluster 77,
BC4
NA Division 03 26-Sep-2017 27-Sep-2017 9:00 AM 28-Sep-2017 B comments
Closed
BC4
Inspection of sand filling around pipe, Storm main line Dia 400mm
Zone 2B,
1941 KHEP-CI-1941
Line 9, MH-I22-L09 to MH-I23-L09 and MH-I23-L09 to MH-I24-L09
Line 9 Zone 2B Division 31 27-Sep-2017 28-Sep-2017 10:00 AM 28-Sep-2017 A Approved Closed
and MH-I24-L09 to MH-I25-L09
Compaction test of sand bedding under pipe trench - Storm Maine
Line Dia 400mm Zone 3B,
1942 KHEP-CI-1942
Line 23 & 31, MH-I109-L31 to MH-110A-L27 and MH-I85-L23 to MH-
Line 23 & 31 Zone 3B Division 31 27-Sep-2017 28-Sep-2017 10:30 AM 28-Sep-2017 A Approved Closed
87-L22

Inspection of dam proofing surface preparation for storm manholes,


1943 KHEP-CI-1943 (Precast yard) Zone 2B, Line 9 Line 9 & 2 Zone 2B Division 33 27-Sep-2017 28-Sep-2017 10:30 AM 28-Sep-2017 A Approved Closed
& 2, MH-I24-L09 and MH-I25-L09, MH-I4-L02 & MH-I5-L02

Concrete sampling, testing and placement inspection for RC Roof


Approved w/
1944 KHEP-CI-1944 Slab Cluster 02 A6 NA Division 03 27-Sep-2017 28-Sep-2017 9:00 AM 28-Sep-2017 B comments
Closed
Cluster 2, A6
Concrete sampling, testing and placement inspection for RC Column
Cluster 37,
1945 KHEP-CI-1945 Neck
BC4
NA Division 03 27-Sep-2017 28-Sep-2017 9:00 AM 28-Sep-2017 A Approved Closed
Cluster 37, BC4
Concrete sampling, testing and placement inspection for RC Column
Cluster 78, Approved w/
1946 KHEP-CI-1946 Neck
BC4
NA Division 03 27-Sep-2017 28-Sep-2017 9:00 AM 28-Sep-2017 B comments
Closed
Cluster 78, BC4
Cast in place concrete form work inspection for RC Footing Cluster 42,
1947 KHEP-CI-1947
Cluster 42, BC4 BC4
NA Division 03 27-Sep-2017 28-Sep-2017 10:00 AM 30-Sep-2017 A Approved Closed

Installation of reinforcing steel bar, embedded item and form closure


Cluster 42,
1948 KHEP-CI-1948 inspection for RC Footing
BC4
NA Division 03 27-Sep-2017 28-Sep-2017 10:00 AM 30-Sep-2017 A Approved Closed
Cluster 42, BC4
Cast in place concrete form work inspection for RC Footing Cluster 74,
1949 KHEP-CI-1949
Cluster 74, BC4 BC4
NA Division 03 27-Sep-2017 28-Sep-2017 10:00 AM 30-Sep-2017 A Approved Closed

Installation of reinforcing steel bar, embedded item and form closure


Cluster 74,
1950 KHEP-CI-1950 inspection for RC Footing
BC4
NA Division 03 27-Sep-2017 28-Sep-2017 10:00 AM 30-Sep-2017 A Approved Closed
Cluster 74, BC4
Cast in place concrete form work inspection for RC Grade Beam
Cluster 6,
1951 KHEP-CI-1951 Cluster 6,
BC4
NA Division 03 27-Sep-2017 28-Sep-2017 3:00 PM 30-Sep-2017 A Approved Closed
BC4
Installation of reinforcing steel bar, embedded item and form closure
Cluster 6,
1952 KHEP-CI-1952 inspection for RC Grade Beam
BC4
NA Division 03 27-Sep-2017 28-Sep-2017 3:00 PM 30-Sep-2017 A Approved Closed
Cluster 6, BC4
Installation of reinforcing steel bar, embedded item and form closure
1953 KHEP-CI-1953 inspection for RC Roof Slab Cluster 15 B2 NA Division 03 27-Sep-2017 28-Sep-2017 11:00 AM 1-Oct-2017 A Approved Closed
Cluster 15, B2
First coat dam proofing installation inspection for CMU, Morter and
1954 KHEP-CI-1954 Masonry inspection under exterior reinforced grade beam Cluster 33, B2 NA Division 07 27-Sep-2017 28-Sep-2017 1:30 PM 28-Sep-2017 A Approved Closed
Cluster 33, B2
First coat dam proofing installation inspection for CMU, Morter and
1955 KHEP-CI-1955 Masonry inspection under exterior reinforced grade beam Cluster 34, B2 NA Division 07 27-Sep-2017 28-Sep-2017 1:30 PM 28-Sep-2017 A Approved Closed
Cluster 34, B2
Compaction test of Sand Filling Above the pipe trench and laying
1956 KHEP-CI-1956 warning tape Storm Maine Line Dia 700mm Line 26 Zone 4B Division 31 27-Sep-2017 28-Sep-2017 10:30 AM 28-Sep-2017 A Approved Closed
Zone 4B, Line 26, MH-120-L26 to MH-125-L26
Inspection of reinforcing steel bar and internal shutter for storm
manholes (precast yard) Zone 2B Line 1 & 27 & Zone 2B & 3B
1957 KHEP-CI-1957
& 3B & 4B, Line 1 & 27 & 23 & 31, MH-I97-L27 and MH-I8-L01 and 23 & 31 & 4B
Division 33 27-Sep-2017 28-Sep-2017 11:30 AM 28-Sep-2017 A Approved Closed
MH-I109-L31 and MH-I85-L23

70cm, CMU motor and masonry inspection under exterior reinforced Cluster 46,
1958 KHEP-CI-1958
grade beam Cluster 46, A6 A6
NA Division 04 27-Sep-2017 28-Sep-2017 3:00 PM 28-Sep-2017 E Rejected Closed

70cm, CMU motor and masonry inspection under exterior reinforced Cluster 46,
1958.1 KHEP-CI-1958-01
grade beam Cluster 46, A6 A6
NA Division 04 30-Sep-2017 1-Oct-2017 2:00 PM 1-Oct-2017 A Approved Closed

Survey data for whole site Inspection cut and fill All Approved w/
1959 KHEP-CI-1959
Zone
NA All Zone Division 31 28-Sep-2017 30-Sep-2017 10:30 AM 23-Oct-2017 B comments
Closed

Compaction test of Sand Filling Above the pipe trench and laying
warning tape Storm Maine Line Dia 400mm
1960 KHEP-CI-1960
Zone 3B, Line 29 & 28, MH-I103-L29 to MH-I104-
Line 29 & 28 Zone 3B Division 31 28-Sep-2017 30-Sep-2017 10:30 AM 1-Oct-2017 A Approved Closed
L28 and MH-I104-L28 to MH-105-L27
Compaction test of Sand Filling Above the pipe trench Storm Maine
1961 KHEP-CI-1961 Line Dia 400mm Zone Line 29 & 28 Zone 3B Division 31 28-Sep-2017 30-Sep-2017 10:30 AM 1-Oct-2017 A Approved Closed
3B, Line 29 & 28, MH-I102-L28 to MH-I104-L28
Inspection damp proofing Surface Preparation for storm manholes,
precast yard Zone 1A & 1B, Line 12 & 11
1962 KHEP-CI-1962
Line 12 & 11 & 17, MH-88-L17 and MH-35-L12 and MH-36-L12 and & 17
Zone 1A & 1B Division 33 28-Sep-2017 30-Sep-2017 10:00 AM 1-Oct-2017 A Approved Closed
MH-37-L11 and MH-38-L11
Termite control surface preparation, installation and final inspection
Cluster 40,
1963 KHEP-CI-1963 for Footing Cluster
BC4
NA Division 03 28-Sep-2017 30-Sep-2017 2:00 PM 1-Oct-2017 E Rejected Closed
40, BC4
Termite control surface preparation, installation and final inspection
Cluster 40,
1963.1 KHEP-CI-1963-01 for Footing Cluster
BC4
NA Division 03 3-Oct-2017 4-Oct-2017 2:00 PM 4-Oct-2017 A Approved Closed
40, BC4
Termite control surface preparation, installation and final inspection
1964 KHEP-CI-1964 for Blinding under grade beam Cluster 54, B2 NA Division 03 28-Sep-2017 30-Sep-2017 2:00 PM 1-Oct-2017 E Rejected Closed
Cluster 54, B2
Termite control surface preparation, installation and final inspection
1964.1 KHEP-CI-1964-01 for Blinding under grade beam Cluster 54, B2 NA Division 03 3-Oct-2017 4-Oct-2017 2:00 PM 4-Oct-2017 A Approved Closed
Cluster 54, B2
Termite control surface preparation, installation and final inspection
Cluster 9,
1965 KHEP-CI-1965 for Blinding under grade beam
BC4
NA Division 03 28-Sep-2017 30-Sep-2017 2:00 PM 1-Oct-2017 E Rejected Closed
Cluster 9, BC4
Installation of reinforcing steel bar, embedded item and form closure
1966 KHEP-CI-1966 inspection for RC Grade Beam Cluster 61, B2 NA Division 03 28-Sep-2017 30-Sep-2017 10:00 AM 1-Oct-2017 A Approved Closed
Cluster 61, B2
Installation of reinforcing steel bar, embedded item and form closure
1967 KHEP-CI-1967 inspection for RC First Floor Slab & Stair Cluster 5, B2 NA Division 03 28-Sep-2017 30-Sep-2017 11:00 AM 1-Oct-2017 A Approved Closed
Cluster 5, B2
Cast in place concrete form work inspection for RC Column (Ground
1968 KHEP-CI-1968 Floor) Cluster 8, B2 NA Division 03 28-Sep-2017 30-Sep-2017 3:00 PM 2-Oct-2017 A Approved Closed
Cluster 8, B2
Building concrete sampling, testing and placement inspection for
Cluster 67,
1969 KHEP-CI-1969 Footing Cluster 67,
A4
NA Division 03 28-Sep-2017 30-Sep-2017 9:00 AM 1-Oct-2017 A Approved Closed
A4
Inspection form work for base & wall and concrete pouring for storm
manholes precast yard Zone 2B &3B & Line 1 & 27 & Zone 2B &3B &
1970 KHEP-CI-1970
4B, Line 1 & 27 & 23 & 31, MH-I97-L27, MH-I8-L01 and MH-I109- 23 & 31 4B
Division 33 28-Sep-2017 30-Sep-2017 11:30 AM 1-Oct-2017 A Approved Closed
L31 and MH-I85-L23

First coat, Bituminous damp proofing installation inspection for storm


1971 KHEP-CI-1971 manholes, precast yard Zone 2B, Line 9 & 2 Zone 2B Division 33 28-Sep-2017 30-Sep-2017 10:30 AM 2-Oct-2017 A Approved Closed
Line 9 & 2, MH-I24-L09 and MH-I25-L09,MH-I4-L02, MH-I5-L02

Cast in place concrete formwork inspection for RC column ground


Cluster 16
1972 KHEP-CI-1972 floor axis (A3,A5,A6,B1,B2,B-C/4,B6,C1,C2,C4,C5,D1,D2,D3,D-
BC4
NA Division 03 28-Sep-2017 30-Sep-2017 10:00 AM 1-Oct-2017 A Approved Closed
C/5,E3,E6,H1,J3,J6) Cluster 16, BC4

Second coat dam proofing installation inspection for CMU, Morter and
1973 KHEP-CI-1973 Masonry inspection under exterior reinforced grade beam Cluster 33, B2 NA Division 07 30-Sep-2017 1-Oct-2017 10:30 AM 1-Oct-2017 A Approved Closed
Cluster 33, B2

Second coat dam proofing installation inspection for CMU, Morter and
1974 KHEP-CI-1974 Masonry inspection under exterior reinforced grade beam Cluster 34, B2 NA Division 07 30-Sep-2017 1-Oct-2017 10:30 AM 1-Oct-2017 A Approved Closed
Cluster 34, B2

Installation of reinforcing steel bar, embedded item and form closure


1975 KHEP-CI-1975 inspection for RC Column (First Floor) Cluster 19 B2 NA Division 03 30-Sep-2017 1-Oct-2017 10:00 AM 1-Oct-2017 A Approved Closed
Cluster 19, B2

Dam Proofing surface preparation for RC Foundation & Column neck Cluster 18
1976 KHEP-CI-1976
Cluster 18, BC4 BC4
NA Division 07 30-Sep-2017 1-Oct-2017 10:00 AM 1-Oct-2017 A Approved Closed

Concrete sampling, testing and placement inspection for RC Roof


1977 KHEP-CI-1977 Slab Cluster 15 B2 NA Division 03 30-Sep-2017 1-Oct-2017 9:00 AM 1-Oct-2017 A Approved Closed
Cluster 15, B2
Installation of reinforcing steel bar, embedded item and form closure
Cluster 76,
1978 KHEP-CI-1978 inspection for RC Column neck
BC4
NA Division 03 30-Sep-2017 1-Oct-2017 10:00 AM 1-Oct-2017 A Approved Closed
Cluster 76, BC4
Installation of reinforcing steel bar, embedded item and form closure
1979 KHEP-CI-1979 inspection for RC Column (Ground Floor) Cluster 75, B2 NA Division 03 30-Sep-2017 1-Oct-2017 10:00 AM 1-Oct-2017 A Approved Closed
Cluster 75, B2
Compaction test 1st and final layer Structural fill (Selected fill)
Cluster
1980 KHEP-CI-1980 Zone 2B,
39,BC6
Zone 2B Division 03 30-Sep-2017 1-Oct-2017 1:30 PM 1-Oct-2017 E Rejected Closed
Cluster 39,BC6
Compaction test 1st and final layer Structural fill (Selected fill)
Cluster Approved w/
1980.1 KHEP-CI-1980-01 Zone 2B,
39,BC6
Zone 2B Division 03 18-Oct-2017 19-Oct-2017 1:30 PM 23-Oct-2017 B comments
Closed
Cluster 39,BC6
Inspection of sand filling around pipe, Storm main line Dia 500mm
Zone 3B,
1981 KHEP-CI-1981
Line 27, MH-I97-L27 to MH-I98-L27 and MH-I98-L27 to MH-I99-L27
Line 27 Zone 3B Division 31 30-Sep-2017 1-Oct-2017 10:00 AM 1-Oct-2017 A Approved Closed
and MH-I99-L27 to MH-I100-L27
Cast in place concrete form work inspection for RC Grade Beam
1982 KHEP-CI-1982 Cluster 20, Cluster 20 B2 NA Division 03 30-Sep-2017 1-Oct-2017 1:30 PM 1-Oct-2017 A Approved Closed
B2
Installation of reinforcing steel bar, embedded item and form closure
1983 KHEP-CI-1983 inspection for RC Grade Beam Cluster 20 B2 NA Division 03 30-Sep-2017 1-Oct-2017 2:00 PM 1-Oct-2017 A Approved Closed
Cluster 20, B2
Cast in place concrete form work inspection for RC Stair (First flight)
1984 KHEP-CI-1984 Cluster Cluster 7, B2 NA Division 03 1-Oct-2017 2-Oct-2017 10:30 AM 4-Oct-2017 A Approved Closed
7, B2
First coat dam proofing installation inspection for CMU, Morter and
1985 KHEP-CI-1985 Masonry inspection under exterior reinforced grade beam Cluster 64, B2 NA Division 07 1-Oct-2017 2-Oct-2017 10:30 AM 4-Oct-2017 A Approved Closed
Cluster 64, B2
Installation of reinforcing steel bar, embedded item and form closure
1986 KHEP-CI-1986 inspection for RC Stair (First flight) Cluster 7, B2 NA Division 03 1-Oct-2017 2-Oct-2017 10:00 AM 4-Oct-2017 A Approved Closed
Cluster 7, B2
Cast in place concrete form work inspection for RC Footing Cluster 41,
1987 KHEP-CI-1987
Cluster 41, BC4 BC4
NA Division 03 1-Oct-2017 2-Oct-2017 10:00 AM 4-Oct-2017 A Approved Closed

Installation of reinforcing steel bar, embedded item and form closure


Cluster 41,
1988 KHEP-CI-1988 inspection for RC Footing
BC4
NA Division 03 1-Oct-2017 2-Oct-2017 10:00 AM 4-Oct-2017 A Approved Closed
Cluster 41, BC4
Cast in place concrete form work inspection for RC First Floor Slab
1989 KHEP-CI-1989 Cluster Cluster 7, B2 NA Division 03 1-Oct-2017 2-Oct-2017 10:00 AM 4-Oct-2017 A Approved Closed
7, B2
Installation of reinforcing steel bar, embedded item and form closure
1990 KHEP-CI-1990 inspection for RC First Floor Slab Cluster 7, B2 NA Division 03 1-Oct-2017 2-Oct-2017 10:00 AM 4-Oct-2017 A Approved Closed
Cluster 7, B2

Compaction test Excavated formation level bottom foundation Cluster 70,


1991 KHEP-CI-1991
Zone 4B, Cluster 70, BC4 BC4
Zone 4B Division 31 1-Oct-2017 2-Oct-2017 1:30 PM 4-Oct-2017 A Approved Closed

Compaction test of Sand Filling Above the pipe trench and laying
1992 KHEP-CI-1992 warning tape Storm Maine Line Dia 400mm Line 37 Zone 3B Division 31 1-Oct-2017 2-Oct-2017 10:30 AM 4-Oct-2017 A Approved Closed
Zone 3B, Line 37, MH-134-L37 to MH-75-L18
Inspection of sand filling around pipe, Storm main line Dia 400mm
1993 KHEP-CI-1993 Zone 2B, Line 1 Zone 2B Division 31 1-Oct-2017 2-Oct-2017 10:00 AM 4-Oct-2017 A Approved Closed
Line 1, MH-6-L01 to MH-I8-L01

Inspection of reinforcing steel bar and internal shutter for storm


Line 20 & 39
manholes (precast yard) Zone 1B
1994 KHEP-CI-1994
& 2B, Line 20 & 39 & 17 & 07 & 15, MH-28-L07 and MH-70-L20 and
& 17 & 07 & Zone 1B & 2B Division 33 1-Oct-2017 2-Oct-2017 11:30 AM 3-Oct-2017 A Approved Closed
15
MH-136-L31 and MH-50-L15 and MH-51-L15 and MH-56-L17
Inspection of reinforcement steel bar, Form work and concrete
pouring for protection slab (10pic) storm main line
1995 KHEP-CI-1995
Zone 3B, Line 28, MH-
Line 28 Zone 3B Division 33 1-Oct-2017 2-Oct-2017 11:30 AM 4-Oct-2017 E Rejected Closed
I102-L28 toofMH-I104-L28
Inspection reinforcement steel bar, Form work and concrete
pouring for protection slab (10pic) storm main line Approved w/
1995.1 KHEP-CI-1995-01
Zone 3B, Line 28, MH-
Line 28 Zone 3B Division 33 4-Oct-2017 5-Oct-2017 11:30 AM 5-Oct-2017 B comments
Closed
I102-L28 to MH-I104-L28
Installation of reinforcing steel bar, embedded item and form closure
Cluster 6,
1996 KHEP-CI-1996 inspection for RC Column (Ground Floor)
BC4
NA Division 03 2-Oct-2017 3-Oct-2017 2:00 PM 4-Oct-2017 A Approved Closed
Cluster 6, BC4
Installation of reinforcing steel bar, embedded item and form closure
1997 KHEP-CI-1997 inspection for RC Column (First Floor) Cluster 5, B2 NA Division 03 2-Oct-2017 3-Oct-2017 2:00 PM 4-Oct-2017 A Approved Closed
Cluster 5, B2
Installation of reinforcing steel bar, embedded item and form closure
1998 KHEP-CI-1998 inspection for RC Column (First Floor) Cluster 17 B2 NA Division 03 2-Oct-2017 3-Oct-2017 2:00 PM 4-Oct-2017 A Approved Closed
Cluster 17, B2

cast in place concrete formwork inspection for Rc column axis


(A1,A4,B1,B2,,B3,C1,,C5,C6,D1,D2,D3,E1,E4,,F1,F2,F3,G2,G5,G6,H1,
1999 KHEP-CI-1999
H2,H3,J1,,J4,K1,K2,K3,L2,L5,L6,M1,M2,M3,N1,N4, A-B/3-4 , D-E/3-
Cluster 4, A6 NA Division 03 2-Oct-2017 3-Oct-2017 10:00 AM 4-Oct-2017 A Approved Closed
4 , E-F/3-4 , ,H-J/3-4 , J-K/3-4 , M-N/ 3-4 ) Cluster 4, A6

Cast in place concrete form work inspection for Rc column neck


Cluster 55,
2000 KHEP-CI-2000 Cluster 55,
BC4
NA Division 03 2-Oct-2017 3-Oct-2017 10:00 AM 4-Oct-2017 A Approved Closed
BC4
Concrete sampling, testing and placement inspection for RC Column
Cluster 16
2001 KHEP-CI-2001 (Ground Floor)
BC4
NA Division 03 2-Oct-2017 3-Oct-2017 9:00 AM 4-Oct-2017 A Approved Closed
Cluster 16, BC4
Concrete sampling, testing and placement inspection for RC Slab on
Approved w/
2002 KHEP-CI-2002 Grade (Lift Slab) Cluster 69, B2 NA Division 03 2-Oct-2017 3-Oct-2017 9:00 AM 4-Oct-2017 B comments
Closed
Cluster 69, B2, Mockup
Concrete sampling, testing and placement inspection for RC Grade
Cluster 6, Approved w/
2003 KHEP-CI-2003 Beam
BC4
NA Division 03 2-Oct-2017 3-Oct-2017 9:00 AM 4-Oct-2017 B comments
Closed
Cluster 6, BC4
Concrete sampling, testing and placement inspection for RC Footing
Cluster 42, Approved w/
2004 KHEP-CI-2004 Cluster 42,
BC4
NA Division 03 2-Oct-2017 3-Oct-2017 9:00 AM 4-Oct-2017 B comments
Closed
BC4
Concrete sampling, testing and placement inspection for RC First
Approved w/
2005 KHEP-CI-2005 Floor Slab Cluster 5, B2 NA Division 03 2-Oct-2017 3-Oct-2017 9:00 AM 4-Oct-2017 B comments
Closed
Cluster 5, B2
Concrete sampling, testing and placement inspection for RC First
Approved w/
2006 KHEP-CI-2006 Floor Slab Cluster 17 B2 NA Division 03 2-Oct-2017 3-Oct-2017 9:00 AM 4-Oct-2017 B comments
Closed
Cluster 17, B2
Concrete sampling, testing and placement inspection for RC Grade
Approved w/
2007 KHEP-CI-2007 Beam Cluster 61, B2 NA Division 03 2-Oct-2017 3-Oct-2017 9:00 AM 4-Oct-2017 B comments
Closed
Cluster 61, B2
Inspection of sand filling around pipe, Storm main line Dia 400mm
Zone 4B,
2008 KHEP-CI-2008
Line 31 & 23, MH-I109-L31 to MH-110A-L27 and MH-I185-L23 to
Line 31 & 23 Zone 4B Division 31 2-Oct-2017 3-Oct-2017 10:00 AM 4-Oct-2017 A Approved Closed
MH-87-L22
Compaction test of Sand Filling Above the pipe trench and laying
warning tape Storm Maine Line Dia 400mm
2009 KHEP-CI-2009
Zone 2B, Line 9, MH-I22-L09 to MH-I23-L09 and
Line 9 Zone 2B Division 31 2-Oct-2017 3-Oct-2017 10:30 AM 4-Oct-2017 A Approved Closed
MH-I23-L09 to MH-I24-L09 and MH-I24-L09 to MH-I25-L09

Inspection form work for base & wall and concrete pouring for storm
Line 20 & 39
manholes precast yard Zone 1B & 2B,
2010 KHEP-CI-2010
Line 20 & 39 & 17 & 07 & 15, MH-28-L07, MH-70-L20 and MH-136-
& 17 & 07 & Zone 1B & 2B Division 33 2-Oct-2017 3-Oct-2017 3:30 PM 8-Oct-2017 A Approved Closed
15
L39 and MH-50-L15 and MH-51-L15 and MH-56-L17

First coat, Bituminous damp proofing installation inspection for storm


manholes, precast yard Zone 1A & Line 12 & 11
2011 KHEP-CI-2011
1B, Line 12 & 11 & 17, MH-55-L17 and MH-35-L12 and MH-36-L12, & 17
Zone 1A & 1B Division 33 2-Oct-2017 3-Oct-2017 10:00 AM 3-Oct-2017 A Approved Closed
MH-37-L11 and MH-38-L11
Installation Inspection ofPrecast Storm Drainage manhole Approved w/
2012 KHEP-CI-2012
Zone 1B, Line 16 & 13, MH-I42-L13, MH-I53-L16
Line 16 & 13 Zone 1B Division 33 2-Oct-2017 3-Oct-2017 11:00 AM 4-Oct-2017 B comments
Closed

Sampling- Aggregate sub base materials Jobsite Approved w/


2013 KHEP-CI-2013
Jobsite StockPile 13 StockPile 13
NA Division 31 2-Oct-2017 3-Oct-2017 10:30 AM 4-Oct-2017 B comments
Closed

Termite control surface preparation, installation and final inspection


Approved w/
2014 KHEP-CI-2014 for Blinding under grade beam Cluster 51, B2 NA Division 03 2-Oct-2017 3-Oct-2017 3:00 PM 4-Oct-2017 B comments
Closed
Cluster 51, B2
Termite control surface preparation, installation and final inspection
Approved w/
2015 KHEP-CI-2015 for Blinding under grade beam Cluster 52, B2 NA Division 03 2-Oct-2017 3-Oct-2017 3:00 PM 4-Oct-2017 B comments
Closed
Cluster 52, B2
Cast in place concrete form work inspection for Rc Grade Beam
2016 KHEP-CI-2016 Cluster 48, Cluster 48, B2 NA Division 03 2-Oct-2017 3-Oct-2017 10:00 AM 4-Oct-2017 A Approved Closed
B2
Installation of reinforcing steel bar, embedded item and form closure
2017 KHEP-CI-2017 inspection for RC Grade Beam Cluster 48, B2 NA Division 03 2-Oct-2017 3-Oct-2017 10:00 AM 4-Oct-2017 A Approved Closed
Cluster 48, B2
Second coat dam proofing installation inspection for CMU, Morter and
2018 KHEP-CI-2018 Masonry inspection under exterior reinforced grade beam Cluster 64, B2 NA Division 03 2-Oct-2017 3-Oct-2017 10:30 AM 3-Oct-2017 A Approved Closed
Cluster 64, B2

Dam Proofing surface preparation for RC Foundation & Column neck Cluster 60,
2019 KHEP-CI-2019
Cluster 60, BC4 BC4
NA Division 07 3-Oct-2017 4-Oct-2017 10:00 AM 7-Oct-2017 A Approved Closed

Inspection of excavated compaction formation for pipe trench, storm


2020 KHEP-CI-2020 main line Dia 600mm Zone 3B, Line Line 20 Zone 3B Division 31 3-Oct-2017 4-Oct-2017 11:00 AM 7-Oct-2017 A Approved Closed
20, MH-71-L20 to MH-I72-L20, MH-I72-L20 to MH-73-L20

Inspection of excavated compaction formation for pipe trench, sewer


main line Dia 200mm Zone 4B, Line 22
2021 KHEP-CI-2021
& 21, MH-1-L21 to MH-1-L22, MH-2-L22 to MH-1-L22, MH-1-L22 to
Line 22 & 21 Zone 4B Division 31 3-Oct-2017 4-Oct-2017 11:00 AM 7-Oct-2017 A Approved Closed
MH-1A-L22, MH-1A-L22 to MH-19-L02
Compaction test of Sand Filling Above the pipe trench and laying
2022 KHEP-CI-2022 warning tape Storm Maine Line Dia 400mm Line 1 Zone 2B Division 31 3-Oct-2017 4-Oct-2017 10:30 AM 5-Oct-2017 A Approved Closed
Zone 2B, Line 1, MH-6-L01 to MH-I8-L01

Back filling general fill final layer for pipe trench, Storm main line Dia
500 & 600mm Zone
2023 KHEP-CI-2023
3B, Line 22, MH-89-L22 to MH-90-L22 and MH-90-L22 to MH-91-L22
Line 22 Zone 3B Division 31 3-Oct-2017 4-Oct-2017 10:00 AM 5-Oct-2017 A Approved Closed
and MH-91-L22 to MH-91A-L22 and MH-91A-L22 to MH-92-L22

Box closing & Grouting for storm embedded pice at manhole


2024 KHEP-CI-2024 Zone 1B, Line 11, MH-I33-L11 Line 11 Zone 1B Division 33 3-Oct-2017 4-Oct-2017 2:00 PM 5-Oct-2017 A Approved Closed
(One side), MH-I34-L11 (Two sides)
Installation of reinforcing steel bar, embedded item and form closure
Approved w/
2025 KHEP-CI-2025 inspection for RC Parapet (Roof Slab) Cluster 01 A6 NA Division 03 4-Oct-2017 5-Oct-2017 10:00 AM 7-Oct-2017 B comments
Closed
Cluster 1, A6

Dam Proofing surface preparation for RC Foundation & Column neck Cluster 23,
2026 KHEP-CI-2026
Cluster 23, BC4 BC4
NA Division 07 4-Oct-2017 5-Oct-2017 3:00 PM 7-Oct-2017 A Approved Closed

Installation of reinforcing steel bar, embedded item and form closure


2027 KHEP-CI-2027 inspection for RC Column (Ground floor) Cluster 20 B2 NA Division 03 4-Oct-2017 5-Oct-2017 2:00 PM 7-Oct-2017 A Approved Closed
Cluster 20, B2
Concrete sampling, testing and placement inspection for RC First
Approved w/
2028 KHEP-CI-2028 Floor slab Cluster 7, B2 NA Division 03 4-Oct-2017 5-Oct-2017 9:00 AM 7-Oct-2017 B comments
Closed
Cluster 7, B2
Concrete sampling, testing and placement inspection for RC Stair
Approved w/
2029 KHEP-CI-2029 (First Flight) Cluster 7, B2 NA Division 03 4-Oct-2017 5-Oct-2017 9:00 AM 7-Oct-2017 B comments
Closed
Cluster 7, B2
Concrete sampling, testing and placement inspection for RC Grade
Approved w/
2030 KHEP-CI-2030 Beam Cluster Cluster 20 B2 NA Division 03 4-Oct-2017 5-Oct-2017 9:00 AM 7-Oct-2017 B comments
Closed
20, B2
Concrete sampling, testing and placement inspection for RC Column
Approved w/
2031 KHEP-CI-2031 (Ground Floor) Cluster 8, B2 NA Division 03 4-Oct-2017 5-Oct-2017 9:00 AM 7-Oct-2017 B comments
Closed
Cluster 8, B2
Inspection of excavated compaction formation for storm manhole
2032 KHEP-CI-2032 storm main line Zone 3B, Line Line 21 Zone 3B Division 31 4-Oct-2017 5-Oct-2017 1:30 PM 7-Oct-2017 A Approved Closed
21, MH-77-L21 to MH-78-L21
Box closing & Grouting for storm embedded pice at manhole
Approved w/
2033 KHEP-CI-2033 Zone 1B, Line 13 & 10, MH-I41- Line 13 & 10 Zone 1B Division 33 4-Oct-2017 5-Oct-2017 2:00 PM 7-Oct-2017 B comments
Closed
L13 (One side), MH-I42-L13 (Two sides), MH-I31-L10 (One side)
Compaction test Around Footing General fill (Final layer) Zone
2034 KHEP-CI-2034
3B, Cluster 63, B2
Cluster 63, B2 Zone 3B Division 31 4-Oct-2017 5-Oct-2017 10:30 AM 7-Oct-2017 A Approved Closed

Compaction test Around Footing General fill (Final layer) Zone


2035 KHEP-CI-2035
4B, Cluster 72, B2
Cluster 72, B2 Zone 4B Division 31 4-Oct-2017 5-Oct-2017 10:30 AM 7-Oct-2017 A Approved Closed

Compaction test Around Footing General fill (Final layer) Zone


2036 KHEP-CI-2036
2B, Cluster 27, B2
Cluster 27, B2 Zone 2B Division 31 4-Oct-2017 5-Oct-2017 10:30 AM 7-Oct-2017 A Approved Closed

Cast in place concrete form work inspection for Rc Column (Ground


2037 KHEP-CI-2037 Floor) Cluster 75, B2 NA Division 03 4-Oct-2017 5-Oct-2017 10:00 AM 7-Oct-2017 A Approved Closed
Cluster 75, B2
Cast in place concrete form work inspection for Rc Grade Beam
2038 KHEP-CI-2038 Cluster 71, Cluster 71, B2 NA Division 03 4-Oct-2017 5-Oct-2017 10:00 AM 7-Oct-2017 A Approved Closed
B2
Installation of reinforcing steel bar, embedded item and form closure
2039 KHEP-CI-2039 inspection for RC Grade Beam Cluster 71, B2 NA Division 03 4-Oct-2017 5-Oct-2017 10:00 AM 7-Oct-2017 A Approved Closed
Cluster 71, B2
First Coat Damp Proofing Installation Inspection for RC Footing &
Cluster 50,
2040 KHEP-CI-2040 Column Neck
BC4
NA Division 07 4-Oct-2017 5-Oct-2017 10:30 AM 7-Oct-2017 A Approved Closed
Cluster 50, BC4
Blindding Concrete sampling, testing and placement inspection for
2041 KHEP-CI-2041 RC Grade Beam Cluster 51, B2 NA Division 03 5-Oct-2017 7-Oct-2017 9:00 AM 7-Oct-2017 A Approved Closed
Cluster 51, B2
Blindding Concrete sampling, testing and placement inspection for
2042 KHEP-CI-2042 RC Grade Beam Cluster 52, B2 NA Division 03 5-Oct-2017 7-Oct-2017 9:00 AM 7-Oct-2017 A Approved Closed
Cluster 52, B2

Concrete sampling, testing and placement inspection for RC Footing Cluster 74,
2043 KHEP-CI-2043
Cluster 74, BC4 BC4
NA Division 03 5-Oct-2017 7-Oct-2017 9:00 AM 8-Oct-2017 A Approved Closed

Concrete sampling, testing and placement inspection for RC Column


2044 KHEP-CI-2044 (Ground Floor) Cluster 4, A6 NA Division 03 5-Oct-2017 7-Oct-2017 9:00 AM 8-Oct-2017 A Approved Closed
Cluster 4, A6
Cast in place concrete form work inspection for Rc Column (First
2045 KHEP-CI-2045 Floor) Cluster 17 B2 NA Division 03 5-Oct-2017 7-Oct-2017 3:00 PM 8-Oct-2017 A Approved Closed
Cluster 17, B2
Installation of reinforcing steel bar, embedded item and form closure
2046 KHEP-CI-2046 inspection for RC Column (First Floor) Cluster 7, B2 NA Division 03 5-Oct-2017 7-Oct-2017 2:00 PM 8-Oct-2017 A Approved Closed
Cluster 7, B2
Compaction test Around Footing General fill (Final layer) Zone
2047 KHEP-CI-2047
2B, Cluster 33, B2
Cluster 33, B2 Zone 2B Division 31 5-Oct-2017 7-Oct-2017 10:30 AM 8-Oct-2017 A Approved Closed

Compaction test Around Footing General fill (Final layer) Zone


2048 KHEP-CI-2048
2B, Cluster 34, B2
Cluster 34, B2 Zone 2B Division 31 5-Oct-2017 7-Oct-2017 11:30 AM 8-Oct-2017 A Approved Closed

Compaction test Around Footing General fill (Final layer) Zone


2049 KHEP-CI-2049
2B, Cluster 35, B2
Cluster 35, B2 Zone 2B Division 31 5-Oct-2017 7-Oct-2017 11:00 AM 8-Oct-2017 A Approved Closed

Compaction test Around Footing General fill (Final layer) Zone Cluster 45,
2050 KHEP-CI-2050
3A, Cluster 45, A6 A6
Zone 3A Division 31 5-Oct-2017 7-Oct-2017 10:30 AM 8-Oct-2017 A Approved Closed

Inspection of excavated compaction formation for sewer manhole


2051 KHEP-CI-2051 sewer main line Zone 1B, Line 3 Line 3 & 5 Zone 1B Division 31 5-Oct-2017 7-Oct-2017 1:30 PM 8-Oct-2017 A Approved Closed
& 5, MH-1-L03 and MH-1A-L03 and MH-2-L05 and MH-1-L05

Compaction test of Sand Filling Above the pipe trench and laying
warning tape Storm Maine Line Dia 500mm
2052 KHEP-CI-2052
Zone 3B, Line 27, MH-100-L27 to MH-I99-L27 and
Line 27 Zone 3B Division 31 5-Oct-2017 7-Oct-2017 11:30 AM 8-Oct-2017 A Approved Closed
MH-I99-L27 to MH-I98-L27
Compaction test of Sand Filling Above the pipe trench Storm Maine
2053 KHEP-CI-2053 Line Dia 500mm Zone Line 27 Zone 3B Division 31 5-Oct-2017 7-Oct-2017 11:30 AM 8-Oct-2017 A Approved Closed
3B, Line 27, MH-I98-L27 to MH-I99-L28
Inspection of excavated formation for pipe Embedded (Short piece)
Storm main line Dia 400mm Zone Line 10 & 11
2054 KHEP-CI-2054
1B, Line 10 & 11 & 13, MH-I31-L10 and MH-I33-L11 and MH-I34-L11 & 13
Zone 1B Division 31 5-Oct-2017 7-Oct-2017 2:00 PM 8-Oct-2017 A Approved Closed
and MH-I41-L13 and MH-I42-L13
Inspection of Dam Proofing surface preparation for storm manholes,
precast yard Zone 2B & 4B, Line 3 & 4 &
2055 KHEP-CI-2055
Line 3 & 4 & 5 & 33, MH-I7-L03 and MH-I12-L04 and MH-I11-L05, 5 & 33
Zone 2B & 4B Division 33 5-Oct-2017 7-Oct-2017 3:00 PM 9-Oct-2017 A Approved Closed
MH-I122-L33
Installation of reinforcing steel bar, embedded item and form closure
2056 KHEP-CI-2056 inspection for RC Column (Ground Floor) Cluster 61, B2 NA Division 03 5-Oct-2017 7-Oct-2017 10:00 AM 8-Oct-2017 A Approved Closed
Cluster 61, B2
Cast in place concrete form work inspection for Rc Roof Slab Approved w/
2057 KHEP-CI-2057
Cluster 14, B2
Cluster 14 B2 NA Division 03 5-Oct-2017 7-Oct-2017 10:00 AM 8-Oct-2017 B comments
Closed

Installation of reinforcing steel bar, embedded item and form closure


2058 KHEP-CI-2058 inspection for RC Roof Slab Cluster 14 B2 NA Division 03 5-Oct-2017 7-Oct-2017 10:00 AM 8-Oct-2017 A Approved Closed
Cluster 14, B2
Installation of reinforcing steel bar, embedded item and form closure
Cluster 42,
2059 KHEP-CI-2059 inspection for RC Column Neck
BC4
NA Division 03 5-Oct-2017 7-Oct-2017 1:30 PM 8-Oct-2017 A Approved Closed
Cluster 42, BC4
Second Coat, Damp Proofing Installation Inspection for RC footing &
Cluster 50,
2060 KHEP-CI-2060 Column Neck
BC4
NA Division 07 5-Oct-2017 7-Oct-2017 10:30 AM 8-Oct-2017 A Approved Closed
Cluster 50, BC4
First Coat, Damp Proofing Installation Inspection for RC footing &
Cluster 18
2061 KHEP-CI-2061 Column Neck
BC4
NA Division 07 5-Oct-2017 7-Oct-2017 10:30 AM 8-Oct-2017 A Approved Closed
Cluster 18, BC4

Concrete sampling, testing and placement inspection for RC Footing Cluster 41,
2062 KHEP-CI-2062
Cluster 41, BC4 BC4
NA Division 03 7-Oct-2017 8-Oct-2017 9:00 AM 8-Oct-2017 A Approved Closed

Concrete sampling, testing and placement inspection for RC Column


Cluster 55,
2063 KHEP-CI-2063 neck Cluster 55,
BC4
NA Division 03 7-Oct-2017 8-Oct-2017 9:00 AM 8-Oct-2017 A Approved Closed
BC4
Concrete sampling, testing and placement inspection for RC Grade
2064 KHEP-CI-2064 Beam Cluster Cluster 48, B2 NA Division 03 7-Oct-2017 8-Oct-2017 9:00 AM 8-Oct-2017 A Approved Closed
48, B2
Blindding Concrete sampling, testing and placement inspection for
Cluster 40,
2065 KHEP-CI-2065 RC Footing
BC4
NA Division 03 7-Oct-2017 8-Oct-2017 9:00 AM 8-Oct-2017 A Approved Closed
Cluster 40, BC4
Cast in place concrete form work inspection for Rc Footing Cluster 40,
2066 KHEP-CI-2066
Cluster 40, BC4 BC4
NA Division 03 7-Oct-2017 8-Oct-2017 10:00 AM 8-Oct-2017 A Approved Closed

Installation of reinforcing steel bar, embedded item and form closure


Cluster 40,
2067 KHEP-CI-2067 inspection for RC Footing
BC4
NA Division 03 7-Oct-2017 8-Oct-2017 10:00 AM 8-Oct-2017 A Approved Closed
Cluster 40, BC4
Inspection of excavated compaction formation for storm manhole
storm main line Zone 2B, Line 1 Line 1 & 3 &
2068 KHEP-CI-2068
& 3 & 4 & 5, MH-I8-L01 and MH-I7-L03 and MH-I10-L04 and MH- 4&5
Zone 2B Division 31 7-Oct-2017 8-Oct-2017 1:30 PM 9-Oct-2017 A Approved Closed
I12-L04 and MH-I11-L05
Inspection of reinforcement steel brand internal shutter for storm
manholes (Precast yard)
Line 7 & 15 & Zone 1B & 2B
2069 KHEP-CI-2069 Zone 1B & 2B & 3B, Line 7 & 15 & 22 & 35, MH-29-
22 & 35 & 3B
Division 33 7-Oct-2017 8-Oct-2017 11:30 AM 9-Oct-2017 A Approved Closed
L07 and MH-52-L15 and MH-54-L15 and MH-90-L22 and MH-91-L22
and MH-132-L35

Inspection of excavated compaction formation for Sewer manhole


Sewer main line Zone 1B, Line 3 Line 3 & 4 &
2070 KHEP-CI-2070
& 4 & 6 & 7 & 8, MH-3-L03 and MH-2-L03 and MH-1-L07 and MH-1- 6&7&8
Zone 1B Division 31 7-Oct-2017 8-Oct-2017 1:30 PM 9-Oct-2017 A Approved Closed
L06 and MH-1-L04 and MH-3-L08 and MH-2-L08 and MH-2-L04

Compaction test of sand bedding under pipe trench - Storm Maine


2071 KHEP-CI-2071 Line Dia 600mm Zone 3B, Line 20 Zone 3B Division 31 7-Oct-2017 8-Oct-2017 10:30 AM 9-Oct-2017 A Approved Closed
Line 20, MH-71-L20 to MH-I72-L20 and MH-I72-L20 to MH-73-L19

Installation of reinforcing steel bar, embedded item and form closure


2072 KHEP-CI-2072 inspection for RC Column (Ground Floor) Cluster 48, B2 NA Division 03 8-Oct-2017 9-Oct-2017 10:00 AM 10-Oct-2017 A Approved Closed
Cluster 48, B2

Cast in place concrete form work inspection for Rc Column neck Cluster 28,
2073 KHEP-CI-2073
Cluster 28, BC4 BC4
NA Division 03 8-Oct-2017 9-Oct-2017 10:00 AM 10-Oct-2017 A Approved Closed

Cast in place concrete form work inspection for Rc Column (First


2074 KHEP-CI-2074 floor) Cluster 5, B2 NA Division 03 8-Oct-2017 9-Oct-2017 2:00 PM 10-Oct-2017 A Approved Closed
Cluster 5, B2
Cast in place concrete form work inspection for Rc Column (Ground
floor) axis ( F1,F2,F3,F6,G1,G2,G4,G5,G6,F-G/5,F-G/5,G- Cluster 6,
2075 KHEP-CI-2075
H/5,H1,H2,H3,H6,J5) BC4
NA Division 03 8-Oct-2017 9-Oct-2017 10:00 AM 10-Oct-2017 A Approved Closed
Cluster 6, BC4
Second Coat, Damp Proofing Installation Inspection for RC footing &
Cluster 18
2076 KHEP-CI-2076 Column Neck
BC4
NA Division 07 8-Oct-2017 9-Oct-2017 10:00 AM 9-Oct-2017 A Approved Closed
Cluster 18, BC4
Termite control surface preparation, installation and final inspection
Cluster 9,
2077 KHEP-CI-2077 for Blinding under grade beam
BC4
NA Division 03 8-Oct-2017 9-Oct-2017 3:00 PM 10-Oct-2017 A Approved Closed
Cluster 9, BC4
Concrete sampling, testing and placement inspection for RC Roof
Approved w/
2078 KHEP-CI-2078 Slab Cluster 14, Cluster 14 B2 NA Division 03 8-Oct-2017 9-Oct-2017 9:00 AM 10-Oct-2017 B comments
Closed
B2
Concrete sampling, testing and placement inspection for RC Column
Approved w/
2079 KHEP-CI-2079 (Ground floor) Cluster 75, B2 NA Division 03 8-Oct-2017 9-Oct-2017 9:00 AM 10-Oct-2017 B comments
Closed
Cluster 75, B2
Inspection of excavated compaction formation for pipe trench storm
main line Dia 400mm Zone 5C,
2080 KHEP-CI-2080
Line 34, MH-128-L34 and MH-129-L34 and MH-129-L34 and MH-
Line 34 Zone 5C Division 31 8-Oct-2017 9-Oct-2017 11:00 AM 10-Oct-2017 A Approved Closed
130-L34 and MH-130-L34 to MH-131-L34
Inspection of excavated compaction formation for Storm manhole
2081 KHEP-CI-2081 Storm main line Zone 2B, Line Line 4 Zone 2B Division 31 8-Oct-2017 9-Oct-2017 1:30 PM 10-Oct-2017 A Approved Closed
4, MH-I13-L04

Compaction test Excavated formation level bottom foundation Cluster 49,


2082 KHEP-CI-2082
Zone 3B, Cluster 49, BC6 BC6
Zone 3B Division 31 8-Oct-2017 9-Oct-2017 1:30 PM 10-Oct-2017 A Approved Closed

Blinding Concrete sampling, testing and placement inspection for


2083 KHEP-CI-2083 Manhole Storm maine line Line 21 Zone 3B Division 31 8-Oct-2017 9-Oct-2017 1:30 PM 10-Oct-2017 A Approved Closed
Zone 3B, Line 21, MH-77-L21 and MH-78-L21
Blinding Concrete sampling, testing and placement inspection for
Manhole Sewer maine line
2084 KHEP-CI-2084
Zone 1B, Line 3 & 5, MH-1-L03 and MH-1A-L03 and MH-
Line 3 & 5 Zone 1B Division 31 8-Oct-2017 9-Oct-2017 1:30 PM 10-Oct-2017 A Approved Closed
2-L05 and MH-1-L05
Back filling general fill final layer for pipe trench, Storm main line Dia
500mm Zone 3B,
2085 KHEP-CI-2085
Line 21, MH-79-L21 to MH-I80-L21 and MH-I80-L21 to MH-I81-L21
Line 21, Zone 3B Division 31 8-Oct-2017 9-Oct-2017 10:00 AM 9-Oct-2017 A Approved Closed
and MH-I81-L21 to MH-82-L21

Back filling general fill final layer for pipe trench, Storm main line Dia
2086 KHEP-CI-2086 500 & 400mm Zone Line 3 & 1 Zone 3B Division 31 8-Oct-2017 9-Oct-2017 10:00 AM 9-Oct-2017 A Approved Closed
3B, Line 3 & 1, MH-I7-L03 to MH-I8-L01 and MH-I8-L01 to MH-9-L01

Back filling general fill final layer for pipe trench, Storm main line Dia
2087 KHEP-CI-2087 500mm Zone 3B, Line 20 Zone 3B Division 31 8-Oct-2017 9-Oct-2017 10:00 AM 9-Oct-2017 A Approved Closed
Line 20, MH-67-L20 to MH-68-L20
Back filling general fill final layer for pipe trench, Storm main line Dia
2088 KHEP-CI-2088 400mm Zone 4B, Line 36 Zone 4B Division 31 8-Oct-2017 9-Oct-2017 10:00 AM 9-Oct-2017 A Approved Closed
Line 36, MH-133-L36 to MH-126-L26
First coat, Bituminous damp proofing installation inspection for storm
manholes, precast yard Zone 2B & Line 3 & 4 &
2089 KHEP-CI-2089
4B, Line 3 & 4 & 5 & 33, MH-I7-L03 and MH-I12-L04,MH-I11-L05, 5 & 33
Zone 2B & 4B Division 33 8-Oct-2017 9-Oct-2017 3:00 PM 10-Oct-2017 A Approved Closed
MH-I122-L33

Inspection of excavated compaction formation for Sewer Manholes


2090 KHEP-CI-2090 sewer main line Zone 1B, Line Line 31 Zone 1B Division 31 8-Oct-2017 9-Oct-2017 1:30 PM 10-Oct-2017 A Approved Closed
31, MH-1-L31 and MH-2-L31 and MH-3-L31 and MH-1A-L08

First Coat, Damp Proofing Installation Inspection for RC footing &


Cluster 23,
2091 KHEP-CI-2091 Column Neck
BC4
NA Division 07 8-Oct-2017 9-Oct-2017 10:00 AM 9-Oct-2017 A Approved Closed
Cluster 23, BC4
Check the survey work, elevation and coordinate for billnding under
grade beam
2092 KHEP-CI-2092
Cluster 27, B2
Cluster 27, B2 NA Division 03 9-Oct-2017 10-Oct-2017 10:00 AM 11-Oct-2017 A Approved Closed

Check the survey work, elevation and coordinate for billnding under
grade beam
2093 KHEP-CI-2093
Cluster 63, B2
Cluster 63, B2 NA Division 03 9-Oct-2017 10-Oct-2017 2:00 PM 11-Oct-2017 A Approved Closed

Damproofing surface preparation for RC foundation & column neck


Cluster 22,
2094 KHEP-CI-2094 Cluster 22,
BC4
NA Division 07 9-Oct-2017 10-Oct-2017 10:00 AM 11-Oct-2017 A Approved Closed
BC4
Cast in place concrete formwork inspection for RC column neck
Cluster 29,
2095 KHEP-CI-2095 Cluster 29,
BC4
NA Division 03 9-Oct-2017 11-Oct-2017 2:00 PM 12-Oct-2017 A Approved Closed
BC4
Cast in place concrete formwork inspection for RC column (ground
floor) axis
Cluster 06
2096 KHEP-CI-2096 (A3,A5,A6,B1,B3,B6,C1,C2,C4,C5,C6,D1,D2,D3,D6,E3,E5,E6,J3,J6)
BC4
NA Division 03 9-Oct-2017 10-Oct-2017 2:00 PM 11-Oct-2017 A Approved Closed
Cluster
06, BC4
Cast in place concrete formwork inspection for RC roof slab Approved w/
2097 KHEP-CI-2097
Cluster 11, B2
Cluster 11 B2 NA Division 03 9-Oct-2017 10-Oct-2017 10:00 AM 14-Oct-2017 B comments
Closed

Installation of reinforced steel bar, embedded item & from closure


2098 KHEP-CI-2098
inspection for RC roof slab Cluster 11, B2
Cluster 11 B2 NA Division 03 9-Oct-2017 10-Oct-2017 10:00 AM 10-Oct-2017 A Approved Closed

Inspection Formwork for base & wall and concrete pouring for Storm
Manholes (Precast yard) Line 7 15 22 Zone 1B,2B &
2099 KHEP-CI-2099
Zone 1B & 2B & 3B, Line 7 15 22 & 35, MH-29-L07, MH- & 35 3B
Division 33 9-Oct-2017 10-Oct-2017 11:30 AM 11-Oct-2017 A Approved Closed
52-L15 and MH-54-L15, MH-90-L22 and MH-91-L22 and MH132-L35
Inspection of damproofing surface preparation for strom manholes,
(Precast yard) Zone 2B & 3B, Line 7,20 &
2100 KHEP-CI-2100
Line 7,20 & 21, MH-27-L07, MH-67-L20 and MH-68-L20 and MH-69- 21
Zone 2B & 3B Division 33 9-Oct-2017 10-Oct-2017 3:00 PM 11-Oct-2017 A Approved Closed
L20, MH-77-L21 and MH-78-L21
Cast in place concrete formwork inspection for Rc grade beam
2101 KHEP-CI-2101
Cluster 73, B2
Cluster 73, B2 NA Division 03 9-Oct-2017 10-Oct-2017 10:00 AM 11-Oct-2017 A Approved Closed

Installation of reinforced steel bar, embedded item & from closure


2102 KHEP-CI-2102
inspection for RC grade beam Cluster 73, B2
Cluster 73, B2 NA Division 03 9-Oct-2017 10-Oct-2017 10:00 AM 11-Oct-2017 A Approved Closed

Cast in place concrete formwork inspection for Rc grade beam


2103 KHEP-CI-2103
Cluster 58, B2
Cluster 58, B2 NA Division 03 9-Oct-2017 10-Oct-2017 1:30 PM 11-Oct-2017 A Approved Closed

Installation of reinforced steel bar, embedded item & from closure


2104 KHEP-CI-2104
inspection for RC grade beam Cluster 58, B2
Cluster 58, B2 NA Division 03 9-Oct-2017 10-Oct-2017 1:30 PM 11-Oct-2017 A Approved Closed

Concrete sampling, testing and placement inspection for RC column


Approved w/
2105 KHEP-CI-2105 (first floor) Cluster Cluster 17 B2 NA Division 03 9-Oct-2017 10-Oct-2017 9:00 AM 11-Oct-2017 B comments
Closed
17, B2

Concrete sampling, testing and placement inspection for RC grade Approved w/


2106 KHEP-CI-2106
beam Cluster 71, B2
Cluster 71, B2 NA Division 03 9-Oct-2017 10-Oct-2017 9:00 AM 11-Oct-2017 B comments
Closed

Second Coat, Damproofing installation inspection and for RC footing


Cluster 23,
2107 KHEP-CI-2107 & column neck Cluster 23,
BC4
NA Division 07 9-Oct-2017 10-Oct-2017 10:00 AM 11-Oct-2017 A Approved Closed
BC4
Cast in place concrete formwork inspection for RC parapet (roof slab)
2108 KHEP-CI-2108 highlighted area Cluster 01 A6 NA Division 03 9-Oct-2017 10-Oct-2017 10:00 AM 11-Oct-2017 A Approved Closed
Cluster 1, A6
Building concrete sampling, testing and placement inspection for
manholes, Storm main line Zone
2109 KHEP-CI-2109
2B, Line 1,3,4 & 5, MH-I8-L01 and MH-I7-L03, MH-I10-L04 and MH-
Line 1,3,4 & 5 Zone 2B Division 31 9-Oct-2017 10-Oct-2017 1:30 PM 11-Oct-2017 A Approved Closed
I12-L04 , MH-I11-L05 and MH-I13-L04

Building concrete sampling, testing and placement inspection for


manholes, Sewer main line Zone Line ,3,4,6,7
2110 KHEP-CI-2110
1B, Line ,3,4,6,7 & 8, MH-3-L03 and MH-2-L03, MH-1-L06 and MH-1- &8
Zone 1B Division 31 9-Oct-2017 10-Oct-2017 1:30 PM 11-Oct-2017 A Approved Closed
L07 and MH-3-L08, MH-1-L04 and MH-2-L04 and MH-2-L08

Inspection of sand filling around pipe - sewer Maine line Dia 200mm
2111 KHEP-CI-2111 Line 01 Zone 3B Division 31 9-Oct-2017 10-Oct-2017 10:00 AM 10-Oct-2017 A Approved Closed
Zone 3B, Line 1, MH-15-L01 to MH-14-L01

Inspection of excavated formation for sewar manholes, sewer maine


Line
line
2112 KHEP-CI-2112
Zone 1B, Line 8,31,32,33 & 34 MH-4-L08 and MH-1-L33, MH-1-A-
8,31,32,33 & Zone 1B Division 31 9-Oct-2017 10-Oct-2017 1:30 PM 11-Oct-2017 A Approved Closed
34
L31 and MH-1-L32, MH2-L34 and MH-1-L34 and MH-1-A-L33

Concrete sampling, testing and placement inspection for RC footing Cluster 40,
2113 KHEP-CI-2113
Cluster 40, BC4 BC4
NA Division 03 10-Oct-2017 11-Oct-2017 2:30 PM 11-Oct-2017 A Approved Closed

Damproofing surface preparation for RC foundation & column neck


Cluster 36,
2114 KHEP-CI-2114 Cluster
BC4
NA Division 07 10-Oct-2017 11-Oct-2017 10:00 AM 11-Oct-2017 A Approved Closed
36, BC4
Damproofing surface preparation for RC foundation & column neck
Cluster 37,
2115 KHEP-CI-2115 Cluster
BC4
NA Division 07 10-Oct-2017 11-Oct-2017 10:00 AM 12-Oct-2017 A Approved Closed
37, BC4
Cast in place concrete formwork inspection for RC roof slab
2116 KHEP-CI-2116
Cluster 13, B2
Cluster 13 B2 NA Division 03 10-Oct-2017 11-Oct-2017 10:00 AM 12-Oct-2017 A Approved Closed

Installation of reinforced steel bar, embedded item & form closure


2117 KHEP-CI-2117
inspection for RC roof slab Cluster 13, B2
Cluster 13 B2 NA Division 03 10-Oct-2017 11-Oct-2017 10:00 AM 11-Oct-2017 A Approved Closed

First Coat, Damproofing installation inspection for Rcfooting &


Cluster 60,
2118 KHEP-CI-2118 Column Neck
BC4
NA Division 07 10-Oct-2017 11-Oct-2017 10:00 AM 11-Oct-2017 A Approved Closed
Cluster 60, BC4

Cast in place concrete formwork inspection for RC Column neck Cluster 42,
2119 KHEP-CI-2119
Cluster 42, BC4 BC4
NA Division 03 10-Oct-2017 11-Oct-2017 10:00 AM 12-Oct-2017 A Approved Closed

Check the survey work, elevation and coordinate for billnding under
grade beam
2120 KHEP-CI-2120
Cluster 35, B2
Cluster 35, B2 NA Division 03 10-Oct-2017 11-Oct-2017 2:00 PM 12-Oct-2017 A Approved Closed
Cast in place concrete formwork inspection for RC Column ground
2121 KHEP-CI-2121 floor Cluster 61, B2 NA Division 03 10-Oct-2017 11-Oct-2017 1:30 PM 12-Oct-2017 A Approved Closed
Cluster 61, B2
Sampling - Marl materials from supplier (saad areemat.EST) Jobsite Stcok Approved w/
2122 KHEP-CI-2122
JobsiteStock file 14 file 14
N/A Division 31 10-Oct-2017 11-Oct-2017 10:30 AM 11-Oct-2017 B comments
Closed

Sampling - Marl materials from supplier (saad areemat.EST) Jobsite Stcok


2122.1 KHEP-CI-2122-01
JobsiteStock file 15 file 15
N/A Division 32 25-Oct-2017 26-Oct-2017 10:30 AM 28-Oct-2017 A Approved Closed

Compact test 1st and final layer structural fill (selected fill) Zone 4B, Cluster 70,
2123 KHEP-CI-2123
Cluster 70, BC4 BC4
Zone 4B Division 31 10-Oct-2017 11-Oct-2017 1:30 PM 12-Oct-2017 A Approved Closed

Compaction Test of sand bendding underpipe trench - storm main


line Dia 400mm Zone
2124 KHEP-CI-2124
5C, Line 34, MH-128-L34 to MH-129-L34, MH-129-L34 to MH-130-
Line 34 Zone 5C Division 34 10-Oct-2017 11-Oct-2017 11:00 AM 11-Oct-2017 A Approved Closed
L34, MH-130-L34 to MH-131-L34
Inspection of excavated formation for storm manholes - storm main
line Zone
2125 KHEP-CI-2125
3B & 4B, Line 21 & 33, MH-I80-L21 and MH-I81-L21 , MH-I121-L33
Line 21 & 33 Zone 3B Division 31 10-Oct-2017 11-Oct-2017 1:30 PM 12-Oct-2017 A Approved Closed
and MH-I122-L33
First Coat, Damproofing installation inspection for storm manholes,
precast yard Zone 2B & Line 7,20 &
2126 KHEP-CI-2126
3B, Line 7 & 20 & 21, MH-27-L07, MH-67-L20 and MH-68-L20 and 21
Zone 2B & 3B Division 33 10-Oct-2017 11-Oct-2017 3:00 PM 11-Oct-2017 A Approved Closed
MH-69-L20, MH-77-L21 and MH-78-L21
Installation of reinforced steel bar, embedded item & form closure
2127 KHEP-CI-2127 inspection for RC Column (Ground Floor) Cluster 71, B2 NA Division 03 11-Oct-2017 12-Oct-2017 10:00 AM 12-Oct-2017 A Approved Closed
Cluster 71, B2
Installation of reinforced steel bar, embedded item & form closure
Cluster 74,
2128 KHEP-CI-2128 inspection for RC Column Neck Cluster 74,
BC4
NA Division 03 11-Oct-2017 12-Oct-2017 10:00 AM 12-Oct-2017 A Approved Closed
BC4
Cast in place concrete formwork inspection for RC Column First floor
2129 KHEP-CI-2129 Cluster 7, Cluster 7, B2 NA Division 03 11-Oct-2017 12-Oct-2017 1:30 PM 12-Oct-2017 A Approved Closed
B2
Concrete sampling, testing and placement inspection for RC Column
Cluster 28, Approved w/
2130 KHEP-CI-2130 Neck Cluster 28,
BC4
NA Division 03 11-Oct-2017 12-Oct-2017 9:00 AM 12-Oct-2017 B comments
Closed
BC4
Concrete sampling, testing and placement inspection for RC Column
Approved w/
2131 KHEP-CI-2131 (First Floor) Cluster Cluster 5, B2 NA Division 03 11-Oct-2017 12-Oct-2017 9:00 AM 12-Oct-2017 B comments
Closed
5, B2
Concrete sampling, testing and placement inspection for RC Roof
Approved w/
2132 KHEP-CI-2132 Slab Cluster 11, Cluster 11 B2 NA Division 03 11-Oct-2017 12-Oct-2017 9:00 AM 12-Oct-2017 B comments
Closed
B2
Blinding Concrete sampling, testing and placement inspection for
Cluster 9,
2133 KHEP-CI-2133 Grade Beam Cluster
BC4
NA Division 03 11-Oct-2017 12-Oct-2017 9:00 AM 12-Oct-2017 A Approved Closed
9, BC4
Termite control surface preparation, installation and final inspection
Cluster 43,
2134 KHEP-CI-2134 for grade beam
A6
NA Division 03 11-Oct-2017 12-Oct-2017 3:00 PM 12-Oct-2017 A Approved Closed
Cluster 43, A6
Termite control surface preparation, installation and final inspection
2135 KHEP-CI-2135 for grade beam Cluster 27, B2 NA Division 03 11-Oct-2017 12-Oct-2017 3:00 PM 12-Oct-2017 A Approved Closed
Cluster 27, B2
Termite control surface preparation, installation and final inspection
2136 KHEP-CI-2136 for grade beam Cluster 63, B2 NA Division 03 11-Oct-2017 12-Oct-2017 3:00 PM 12-Oct-2017 A Approved Closed
Cluster 63, B2
Termite control surface preparation, installation and final inspection
2137 KHEP-CI-2137 for grade beam Cluster 35, B2 NA Division 03 11-Oct-2017 12-Oct-2017 3:00 PM 12-Oct-2017 A Approved Closed
Cluster 35, B2
Cast in place concrete formwork inspection for RC Column Neck
Cluster 76,
2138 KHEP-CI-2138 Cluster 76,
BC4
NA Division 03 11-Oct-2017 12-Oct-2017 10:00 AM 12-Oct-2017 A Approved Closed
BC4
Inspection of Sand filling around pipe - storm main line
2139 KHEP-CI-2139 Zone 3B, Line 20, MH- Line 20 Zone 3B Division 31 11-Oct-2017 12-Oct-2017 10:00 AM 15-Oct-2017 A Approved Closed
71-L20 and MH-I72-L20 , MH-I72-L20 and MH-73-L19
Compaction test Around Footing General fill (Final layer) Zone
2140 KHEP-CI-2140
3A, Cluster 64, B2
Cluster 64, B2 Zone 3A Division 31 11-Oct-2017 12-Oct-2017 10:30 AM 14-Oct-2017 A Approved Closed

Building concrete sampling, testing and placement inspection for


manholes, Sewer main line Zone
Line 8 & 31 &
2141 KHEP-CI-2141 1B, Line 8 & 31 & 32 & 33 & 34, MH-4-L08 and MH-1-L33, MH-3-L31
32 & 33 & 34
Zone 1B Division 31 11-Oct-2017 12-Oct-2017 1:30 PM 15-Oct-2017 A Approved Closed
and MH-1A-L31 , MH-1-L32 and MH-2-L31 and MH-2-L34 and MH-1-
L31 and MH-1A-L33
Inspection of reinforcement steel brand Form work for base and
concrete pouring for Sewer GRP Manholes (Precast yard)
Approved w/
2142 KHEP-CI-2142 Zone 1B, Line 4, 7, Line 4, 7, 8 Zone 1B Division 33 11-Oct-2017 12-Oct-2017 11:30 AM 12-Oct-2017 B comments
Closed
8, MH-1-L07 and MH-2-L04 and MH-1-L04 and MH-3-L08 and MH-2-
L08 and MH-1-L08
Compaction test of Sand Filling Above the pipe trench and laying
2143 KHEP-CI-2143 warning tape Sewer Maine Line Dia 200mm Line 1 Zone 3B Division 31 12-Oct-2017 14-Oct-2017 11:30 AM 15-Oct-2017 A Approved Closed
Zone 3B, Line 1, MH-15-L01 to MH-14-L01
Installation Inspection of Precast Storm Drainage Manhole
2144 KHEP-CI-2144 Zone 4B, Line 22, MH-83-L22 and Line 22 Zone 4B Division 33 12-Oct-2017 14-Oct-2017 11:00 AM 15-Oct-2017 A Approved Closed
MH-84-L22 and MH-87-L22 and MH-88-L22
Installation of Blinding concrete for Main Sewer Line Encasement as
per attached highlighted drawing
2145 KHEP-CI-2145 Zone 4B, Line 21 & 22, MH-2-L22 and MH-1-L22 and MH-1- Line 21 & 22 Zone 4B, Division 31 12-Oct-2017 14-Oct-2017 1:30 PM 16-Oct-2017 A Approved Closed
L22 and MH-1A-L22 and MH-1A-L22 and MH-19-L02 and MH-1-L21
to MH-1-L22
Concrete sampling, testing and placement inspection for RC Parapet
2146 KHEP-CI-2146 (Roof Slab) Cluster 01 A6 NA Division 03 12-Oct-2017 14-Oct-2017 9:00 AM 14-Oct-2017 A Approved Closed
Cluster 1, A6
Concrete sampling, testing and placement inspection for RC Roof
2147 KHEP-CI-2147 Slab Cluster Cluster 13 B2 NA Division 03 12-Oct-2017 14-Oct-2017 9:00 AM 14-Oct-2017 A Approved Closed
13, B2
Concrete sampling, testing and placement inspection for RC Column
Cluster 6,
2148 KHEP-CI-2148 (Ground Floor)
BC4
NA Division 03 12-Oct-2017 14-Oct-2017 9:00 AM 14-Oct-2017 A Approved Closed
Cluster 6, BC4
Blinding Concrete sampling, testing and placement inspection for
Approved w/
2149 KHEP-CI-2149 Grade Beam Cluster 35, B2 NA Division 03 12-Oct-2017 14-Oct-2017 9:00 AM 14-Oct-2017 B comments
Closed
Cluster 35, B2
Cast in place concrete formwork inspection for RC Roof Slab Approved w/
2150 KHEP-CI-2150
Cluster 10, B2
Cluster 10 B2 NA Division 03 12-Oct-2017 14-Oct-2017 10:00 AM 14-Oct-2017 B comments
Closed

Installation of reinforced steel bar, embedded item & form closure


2151 KHEP-CI-2151
inspection for RC Roof Slab Cluster 10, B2
Cluster 10 B2 NA Division 03 12-Oct-2017 14-Oct-2017 10:00 AM 14-Oct-2017 A Approved Closed

Second coat, Damp proofing installation inspection for RC Footing & Cluster 60,
2152 KHEP-CI-2152
Column Neck Cluster 60, BC4 BC4
NA Division 07 12-Oct-2017 14-Oct-2017 10:00 AM 14-Oct-2017 A Approved Closed

First coat, Damp proofing installation inspection for RC Footing & Cluster 22,
2153 KHEP-CI-2153
Column Neck Cluster 22, BC4 BC4
NA Division 07 12-Oct-2017 14-Oct-2017 10:00 AM 14-Oct-2017 A Approved Closed

Cast in place concrete formwork inspection for RC Column neck


Cluster 56, Approved w/
2154 KHEP-CI-2154 Cluster 56,
BC4
NA Division 03 12-Oct-2017 14-Oct-2017 10:00 AM 14-Oct-2017 B comments
Closed
BC4
Check the survey work, elevation and coordinate for billnding under
grade beam Cluster 64,
2155 KHEP-CI-2155
Cluster 64, B2 B2
NA Division 03 12-Oct-2017 14-Oct-2017 10:00 AM 14-Oct-2017 A Approved Closed

Inspection of damproofing surface preparation for storm manholes,


(Precast yard) Zone 2B & 3B & Line 4 & 27 & Zone 2B & 3B
2156 KHEP-CI-2156
4B, Line 4 & 27 & 32 & 33, MH-I10-L04, MH-I98-L27 and MH-I113- 32 & 33 & 4B
Division 33 12-Oct-2017 14-Oct-2017 10:00 AM 16-Oct-2017 A Approved Closed
L32 and MH-I121-L33
Inspection of reinforcement steel bar, Form work and Internal
Shutter for Storm Manholes (Precast yard)
Line 7 & 1 & Zone 1B & 3B
2157 KHEP-CI-2157 Zone 1B & 3B & 4B, Line 7 & 1 &
22 & 24 & 26 & 4B
Division 33 14-Oct-2017 15-Oct-2017 11:30 AM 16-Oct-2017 A Approved Closed
22 & 24 & 26, MH-29A-L07 and MH-6-L01 and MH-71-L20 and MH-
91A-L22 and MH-93-L24 and MH-96-L26
Building concrete sampling, testing and placement inspection for
manholes, Storm main line Zone
2158 KHEP-CI-2158
3B & 4B, Line 21 & 33, MH-I80-L21 and MH-I81-L21, MH-I121-L33
Line 21 & 33 Zone 3B & 4B Division 31 14-Oct-2017 15-Oct-2017 1:30 PM 16-Oct-2017 A Approved Closed
and MH-I122-L33

Compaction test Excavated formation level bottom foundation Cluster 38,


2159 KHEP-CI-2159
Zone 2B, Cluster 38, BC6 BC6
Zone 2B Division 31 14-Oct-2017 15-Oct-2017 1:30 PM 16-Oct-2017 A Approved Closed

Check the survey work, elevation and coordinate for blinding under
Cluster 70, Approved w/
2160 KHEP-CI-2160 Footing Cluster 70,
BC4
NA Division 03 14-Oct-2017 16-Oct-2017 2:00 PM 17-Oct-2017 B comments
Closed
BC4
Check the survey work, elevation and coordinate for blinding under
2161 KHEP-CI-2161 Grade Beam Cluster Cluster 72, B2 NA Division 03 14-Oct-2017 16-Oct-2017 2:00 PM 17-Oct-2017 A Approved Closed
72, B2
Concrete sampling, testing and placement inspection for RC Column
2162 KHEP-CI-2162 (Ground Floor) Cluster 61, B2 NA Division 03 14-Oct-2017 15-Oct-2017 9:00 AM 15-Oct-2017 A Approved Closed
Cluster 61, B2
Concrete sampling, testing and placement inspection for RC Grade
2163 KHEP-CI-2163 Beam Cluster 58, Cluster 58, B2 NA Division 03 14-Oct-2017 15-Oct-2017 9:00 AM 15-Oct-2017 A Approved Closed
B2
Concrete sampling, testing and placement inspection for RC Column
Cluster 42,
2164 KHEP-CI-2164 Neck Cluster 42,
BC4
NA Division 03 14-Oct-2017 15-Oct-2017 9:00 AM 15-Oct-2017 A Approved Closed
BC4
Blinding Concrete sampling, testing and placement inspection for
Cluster 43,
2165 KHEP-CI-2165 Grade Beam Cluster
A6
NA Division 03 14-Oct-2017 15-Oct-2017 9:00 AM 15-Oct-2017 A Approved Closed
43, A6
Blinding Concrete sampling, testing and placement inspection for
2166 KHEP-CI-2166 Grade Beam Cluster Cluster 27, B2 NA Division 03 14-Oct-2017 15-Oct-2017 9:00 AM 15-Oct-2017 A Approved Closed
27, B2
Check the survey work, elevation and coordinate for blinding under
2167 KHEP-CI-2167 Grade Beam Cluster Cluster 33, B2 NA Division 03 14-Oct-2017 15-Oct-2017 2:00 PM 15-Oct-2017 A Approved Closed
33, B2
Check the survey work, elevation and coordinate for blinding under
2168 KHEP-CI-2168 Grade Beam Cluster Cluster 34, B2 NA Division 03 14-Oct-2017 15-Oct-2017 2:00 PM 15-Oct-2017 A Approved Closed
34, B2
Second Coat, Damproofing installation inspection and for RC footing
Cluster 22,
2169 KHEP-CI-2169 & column neck Cluster 22,
BC4
NA Division 07 14-Oct-2017 15-Oct-2017 10:00 AM 16-Oct-2017 A Approved Closed
BC4
Installation of reinforced steel bar, embedded item & form closure
Cluster 41,
2170 KHEP-CI-2170 inspection for RC Column Neck Cluster 41,
BC4
NA Division 03 14-Oct-2017 15-Oct-2017 10:00 AM 16-Oct-2017 A Approved Closed
BC4
Inspection of excavated and Compaction formation for storm
manholes - storm main line
2171 KHEP-CI-2171
Zone 1B, Line 9, MH-I22-L09 and MH-I23-L09 ,
Line 9 Zone 1B Division 31 14-Oct-2017 15-Oct-2017 1:30 PM 16-Oct-2017 A Approved Closed
MH-I24-L09 and MH-I25-L09
Inspection of reinforcement steel brand Form work for base and
concrete pouring for Sewer GRP Manholes
Line 5 & 3 &
2172 KHEP-CI-2172 Zone 1B, Line 5 & 3 & 6 & 8, MH-
6&8
Zone 1B Division 33 14-Oct-2017 15-Oct-2017 11:30 AM 16-Oct-2017 A Approved Closed
1-L06 and MH-4-L08 and MH-1A-L03 and MH-1-L03 and MH-1-L05
and MH-2-L05
Concrete sampling, testing and placement inspection for RC Column
Cluster 76, Approved w/
2173 KHEP-CI-2173 Neck Cluster 76,
BC4
NA Division 03 15-Oct-2017 16-Oct-2017 9:00 AM 17-Oct-2017 B comments
Closed
BC4
Concrete sampling, testing and placement inspection for RC Column
Approved w/
2174 KHEP-CI-2174 (First floor) Cluster Cluster 7, B2 NA Division 03 15-Oct-2017 16-Oct-2017 9:00 AM 17-Oct-2017 B comments
Closed
7, B2
Concrete sampling, testing and placement inspection for RC Roof
Approved w/
2175 KHEP-CI-2175 Slab Cluster 10, Cluster 10 B2 NA Division 03 15-Oct-2017 16-Oct-2017 9:00 AM 17-Oct-2017 B comments
Closed
B2
Concrete sampling, testing and placement inspection for RC Roof
Approved w/
2176 KHEP-CI-2176 Slab Cluster 73, Cluster 73, B2 NA Division 03 15-Oct-2017 16-Oct-2017 9:00 AM 17-Oct-2017 B comments
Closed
B2
Cast in place concrete formwork inspection for RC Stair (First Flight)
Cluster 16
2177 KHEP-CI-2177 Cluster
BC4
NA Division 03 15-Oct-2017 16-Oct-2017 10:00 AM 17-Oct-2017 A Approved Closed
16, BC4
Installation of reinforced steel bar, embedded item & form closure
Cluster 16
2178 KHEP-CI-2178 inspection for RC Stair (First Flight)
BC4
NA Division 03 15-Oct-2017 16-Oct-2017 10:00 AM 17-Oct-2017 A Approved Closed
Cluster 16, BC4
Cast in place concrete formwork inspection for RC Stair (First Flight)
2179 KHEP-CI-2179 Cluster 8, Cluster 8, B2 NA Division 03 15-Oct-2017 16-Oct-2017 10:00 AM 17-Oct-2017 A Approved Closed
B2
Installation of reinforced steel bar, embedded item & form closure
2180 KHEP-CI-2180 inspection for RC Stair (First Flight) Cluster 8, B2 NA Division 03 15-Oct-2017 16-Oct-2017 10:00 AM 17-Oct-2017 A Approved Closed
Cluster 8, B2
Cast in place concrete formwork inspection for RC Stair (First Flight)
2181 KHEP-CI-2181 Cluster Cluster 61, B2 NA Division 03 15-Oct-2017 16-Oct-2017 10:00 AM 17-Oct-2017 A Approved Closed
61, B2
Installation of reinforced steel bar, embedded item & form closure
2182 KHEP-CI-2182 inspection for RC Stair (First Flight) Cluster 61, B2 NA Division 03 15-Oct-2017 16-Oct-2017 10:00 AM 17-Oct-2017 A Approved Closed
Cluster 61, B2
Cast in place concrete formwork inspection for RC Grade Beam
2183 KHEP-CI-2183
Cluster 51, B2
Cluster 51, B2 NA Division 03 15-Oct-2017 16-Oct-2017 2:00 PM 18-Oct-2017 A Approved Closed

Installation of reinforced steel bar, embedded item & form closure


2184 KHEP-CI-2184 inspection for RC Grade Beam Cluster 51, B2 NA Division 03 15-Oct-2017 16-Oct-2017 2:00 PM 18-Oct-2017 A Approved Closed
Cluster 51, B2

Dam Proofing surface preparation for RC Foundation & Column neck Cluster 25,
2185 KHEP-CI-2185
Cluster 25, BC4 BC4
NA Division 07 15-Oct-2017 16-Oct-2017 2:00 PM 18-Oct-2017 A Approved Closed

Cast in place concrete formwork inspection for RC Column (Ground


2186 KHEP-CI-2186 Floor) Cluster 19 B2 NA Division 03 15-Oct-2017 16-Oct-2017 2:00 PM 17-Oct-2017 A Approved Closed
Cluster 19, B2
Compaction test of Sand Filling Above the pipe trench and laying
warning tape Storm Maine Line Dia 600mm Approved w/
2187 KHEP-CI-2187
Zone 3B, Line 20, MH-71-L20 to MH-I72-L20 and
Line 20 Zone 3B Division 31 15-Oct-2017 16-Oct-2017 10:00 AM 17-Oct-2017 B comments
Closed
MH-73-L19 and MH-I72-L20 to MH-73-49
Compaction test 1st and final layer Structural fill (Selected fill)
Cluster 49,
2188 KHEP-CI-2188 Bottom of Foundation Zone
BC6
Zone 3B Division 31 15-Oct-2017 16-Oct-2017 1:45 PM 16-Oct-2017 A Approved Closed
3B, Cluster 49, BC6
Check the survey work, elevation and coordinate for blinding under
Cluster 39, Approved w/
2189 KHEP-CI-2189 Grade Beam Cluster
BC6
NA Division 03 15-Oct-2017 16-Oct-2017 2:00 PM 17-Oct-2017 B comments
Closed
39, BC6
Termite control surface preparation, installation and final inspection
2190 KHEP-CI-2190 for grade beam Cluster 33, B2 NA Division 03 16-Oct-2017 17-Oct-2017 3:00 PM 18-Oct-2017 A Approved Closed
Cluster 33, B2
Termite control surface preparation, installation and final inspection
2191 KHEP-CI-2191 for grade beam Cluster 34, B2 NA Division 03 16-Oct-2017 17-Oct-2017 3:00 PM 18-Oct-2017 A Approved Closed
Cluster 34, B2
Concrete sampling, testing and placement inspection for RC Column
Cluster 56, Approved w/
2192 KHEP-CI-2192 Neck Cluster 56,
BC4
NA Division 03 16-Oct-2017 17-Oct-2017 9:00 AM 18-Oct-2017 B comments
Closed
BC4
Cast in place concrete formwork inspection for RC Column Neck
Cluster 41,
2193 KHEP-CI-2193 Cluster 41,
BC4
NA Division 03 16-Oct-2017 18-Oct-2017 10:00 AM 18-Oct-2017 A Approved Closed
BC4
Inspection Formwork for base & wall and concrete pouring for Storm
Manholes (Precast yard)
Line 7 & 1 & Zone 1B & 3B Approved w/
2194 KHEP-CI-2194 Zone 1B & 3B & 4B, Line 7 & 1 & 22 & 24 & 26, MH-29A-
22 & 24 & 26 & 4B
Division 33 16-Oct-2017 17-Oct-2017 11:30 AM 19-Oct-2017 B comments
Closed
L07, MH-6-L01 and MH-71-L20, MH-91A-L22 and MH-93-L24 and
MH-96-L26
Inspection of sand filling around pipe - storm Maine line Dia 400mm
Approved w/
2195 KHEP-CI-2195
Zone 5C, Line 34, MH-128-L34 to MH-129-L34 and MH-129-L34 to
Line 34 Zone 5C Division 31 16-Oct-2017 17-Oct-2017 10:00 AM 18-Oct-2017 B comments
Closed
MH-130-L34 and MH-130-L34 to MH-131-L34

Cast in place concrete formwork inspection for RC Grade Beam Cluster 44,
2196 KHEP-CI-2196
Cluster 44, A6 A6
NA Division 03 16-Oct-2017 17-Oct-2017 10:00 AM 18-Oct-2017 A Approved Closed

Installation of reinforced steel bar, embedded item & form closure


Cluster 44,
2197 KHEP-CI-2197 inspection for RC Grade Beam
A6
NA Division 03 16-Oct-2017 17-Oct-2017 10:00 AM 18-Oct-2017 A Approved Closed
Cluster 44, A6

Cast in place concrete formwork inspection for RC Grade Beam Cluster 9,


2198 KHEP-CI-2198
Cluster 9, BC4 BC4
NA Division 03 16-Oct-2017 17-Oct-2017 1:30 PM 18-Oct-2017 A Approved Closed

Installation of reinforced steel bar, embedded item & form closure


Cluster 9,
2199 KHEP-CI-2199 inspection for RC Grade Beam
BC4
NA Division 03 16-Oct-2017 17-Oct-2017 1:30 PM 18-Oct-2017 A Approved Closed
Cluster 9, BC4
Installation of reinforced steel bar, embedded item & form closure
2200 KHEP-CI-2200 inspection for RC Column (Ground Floor) Cluster 58, B2 NA Division 03 17-Oct-2017 18-Oct-2017 10:00 AM 19-Oct-2017 A Approved Closed
Cluster 58, B2
Damproofing surface preparation for RC foundation & column neck
Cluster 55,
2201 KHEP-CI-2201 Cluster
BC4
NA Division 03 17-Oct-2017 18-Oct-2017 2:00 PM 19-Oct-2017 A Approved Closed
55, BC4
Installation of reinforced steel bar, embedded item & form closure
Cluster 77,
2202 KHEP-CI-2202 inspection for RC Column Neck
BC4
NA Division 03 17-Oct-2017 18-Oct-2017 10:00 AM 19-Oct-2017 A Approved Closed
Cluster 77, BC4
First coat dam proofing installation inspection for CMU, Morter and
Cluster 21,
2203 KHEP-CI-2203 Masonry inspection under exterior reinforced grade beam
BC4
NA Division 03 17-Oct-2017 18-Oct-2017 10:30 AM 19-Oct-2017 A Approved Closed
Cluster 21, BC4
70cm, CMU motor and masonry inspection under exterior reinforced
Cluster 24,
2204 KHEP-CI-2204 grade beam Cluster 24,
BC4
NA Division 04 17-Oct-2017 18-Oct-2017 2:00 PM 19-Oct-2017 A Approved Closed
BC4
Concrete sampling, testing and placement inspection for RC Stair
Cluster 16 Approved w/
2205 KHEP-CI-2205 (First Flight)
BC4
NA Division 03 17-Oct-2017 18-Oct-2017 9:00 AM 19-Oct-2017 B comments
Closed
Cluster 16, BC4
Concrete sampling, testing and placement inspection for RC Stair
Approved w/
2206 KHEP-CI-2206 (First Flight) Cluster 8, B2 NA Division 03 17-Oct-2017 18-Oct-2017 9:00 AM 19-Oct-2017 B comments
Closed
Cluster 8, B2
Concrete sampling, testing and placement inspection for RC Column
Cluster 29, Approved w/
2207 KHEP-CI-2207 Neck Cluster 29,
BC4
NA Division 03 17-Oct-2017 18-Oct-2017 9:00 AM 19-Oct-2017 B comments
Closed
BC4
Cast in place concrete form work inspection for RC Roof Slab
2208 KHEP-CI-2208
Cluster 12, B2
Cluster 12 B2 NA Division 03 17-Oct-2017 18-Oct-2017 10:00 AM 28-Oct-2017 A Approved Closed

Installation of reinforced steel bar, embedded item & form closure


2209 KHEP-CI-2209 inspection for RC Roof Slab Cluster 12 B2 NA Division 03 17-Oct-2017 18-Oct-2017 10:00 AM 19-Oct-2017 A Approved Closed
Cluster 12, B2
Compaction test 1st and final layer Structural fill (Selected fill) Cluster
2210 KHEP-CI-2210
Zone 2B, Cluster 38,BC6 38,BC6
Zone 2B Division 31 17-Oct-2017 18-Oct-2017 1:30 PM 19-Oct-2017 A Approved Closed
Installation Inspection of GRP Manhole and Inspection of base slab
reinforcement, Form work, concrete pouring
Line 31 & 32 Approved w/
2211 KHEP-CI-2211 Zone 1B, Line 31 & 32 & 33,
& 33
Zone 1B Division 33 17-Oct-2017 18-Oct-2017 11:30 AM 19-Oct-2017 B comments
Closed
MH-3-L31 and MH-2-L31 and MH-1-L31 and MH-1A-L31 and MH-1-
L32 and MH-1-L33
Installation for Sewer GRP Manholes
Line 5 & 3 & 6
2212 KHEP-CI-2212 Zone 1B, Line 5 & 3 & 6 & 8, MH-1A- Zone 1B
&8
Division 33 17-Oct-2017 18-Oct-2017 11:30 AM 19-Oct-2017 A Approved Closed
L03 and MH-1-L03 and MH-1-L05 and MH-2-L05

Cast in place concrete form work inspection for RC Grade Beam


2213 KHEP-CI-2213
Cluster 52, B2
Cluster 52, B2 NA Division 03 17-Oct-2017 18-Oct-2017 10:00 AM 19-Oct-2017 A Approved Closed

Installation of reinforced steel bar, embedded item & form closure


2214 KHEP-CI-2214 inspection for RC Grade Beam Cluster 52, B2 NA Division 03 17-Oct-2017 18-Oct-2017 10:00 AM 19-Oct-2017 A Approved Closed
Cluster 52, B2
Cast in place concrete form work inspection for RC Parapet Roof
Approved w/
2215 KHEP-CI-2215 Slab) Excluding Highlighted area Cluster 02 A6 NA Division 03 17-Oct-2017 18-Oct-2017 2:00 PM 23-Oct-2017 B comments
Closed
Cluster 2, A6

Installation of reinforced steel bar, embedded item & form closure


Approved w/
2216 KHEP-CI-2216 inspection for RC Parapet Roof Slab) Excluding Highlighted area Cluster 02 A6 NA Division 03 17-Oct-2017 18-Oct-2017 2:00 PM 23-Oct-2017 B comments
Closed
Cluster 2, A6

First Coat, Damproofing installation inspection and for RC footing &


Cluster 36,
2217 KHEP-CI-2217 column neck Cluster 36,
BC4
NA Division 07 17-Oct-2017 18-Oct-2017 2:00 PM 19-Oct-2017 A Approved Closed
BC4
Termite control surface preparation, installation and final inspection
Cluster 70,
2218 KHEP-CI-2218 for Footing Cluster
BC4
NA Division 03 18-Oct-2017 19-Oct-2017 3:00 PM 19-Oct-2017 A Approved Closed
70, BC4
Termite control surface preparation, installation and final inspection
Cluster 39,
2219 KHEP-CI-2219 for Footing Cluster
BC6
NA Division 03 18-Oct-2017 19-Oct-2017 3:00 PM 19-Oct-2017 A Approved Closed
39, BC6
Termite control surface preparation, installation and final inspection
2220 KHEP-CI-2220 for Grade beam Cluster 72, B2 NA Division 03 18-Oct-2017 19-Oct-2017 3:00 PM 19-Oct-2017 A Approved Closed
Cluster 72, B2
Termite control surface preparation, installation and final inspection
2221 KHEP-CI-2221 for Grade beam Cluster 64, B2 NA Division 03 18-Oct-2017 19-Oct-2017 3:00 PM 19-Oct-2017 A Approved Closed
Cluster 64, B2
Concrete sampling, testing and placement inspection for RC Stair
Approved w/
2222 KHEP-CI-2222 (First Flight) Cluster 61, B2 NA Division 03 18-Oct-2017 19-Oct-2017 9:00 AM 19-Oct-2017 B comments
Closed
Cluster 61, B2
Concrete sampling, testing and placement inspection for RC Column
Approved w/
2223 KHEP-CI-2223 (Ground Floor) Cluster 19 B2 NA Division 03 18-Oct-2017 19-Oct-2017 9:00 AM 19-Oct-2017 B comments
Closed
Cluster 19, B2
Concrete sampling, testing and placement inspection for RC Garde
Approved w/
2224 KHEP-CI-2224 Beam Cluster 51, Cluster 51, B2 NA Division 03 18-Oct-2017 19-Oct-2017 9:00 AM 19-Oct-2017 B comments
Closed
B2
Installation of reinforced steel bar inspection for RC Column (Ground
Approved w/
2225 KHEP-CI-2225 Floor) Cluster 51, B2 NA Division 03 18-Oct-2017 19-Oct-2017 2:00 PM 21-Oct-2017 B comments
Closed
Cluster 51, B2
Cast in place concrete form work inspection for RC Column (Ground
Approved w/
2226 KHEP-CI-2226 Floor) Cluster 48, B2 NA Division 03 18-Oct-2017 19-Oct-2017 10:00 AM 21-Oct-2017 B comments
Closed
Cluster 48, B2

Cast in place concrete form work inspection for RC Grade Beam


2227 KHEP-CI-2227
Cluster 54, B2
Cluster 54, B2 NA Division 03 18-Oct-2017 19-Oct-2017 10:00 AM 21-Oct-2017 E Rejected Closed

Cast in place concrete form work inspection for RC Grade Beam


2227.1 KHEP-CI-2227-01
Cluster 54, B2
Cluster 54, B2 NA Division 03 22-Oct-2017 23-Oct-2017 10:00 AM 24-Oct-2017 A Approved Closed

Compaction test of Sand Filling Above the pipe trench and laying
warning tape Storm Maine Line Dia 400mm
2228 KHEP-CI-2228
Zone 5C, Line 34, MH-128-L34 to MH-129-L34
Line 34 Zone 5C Division 31 18-Oct-2017 19-Oct-2017 10:00 AM 19-Oct-2017 A Approved Closed
and MH-129-L34 to MH-130-L34 and MH-130-34 to MH-131-L34
Inspection of excavated and Compaction formation for storm
manholes - Sewer main line Approved w/
2229 KHEP-CI-2229
Zone 1B, Line 8 & 34, MH-1-L08 and MH-1A-L34
Line 8 & 34 Zone 1B Division 31 18-Oct-2017 19-Oct-2017 1:30 PM 21-Oct-2017 B comments
Closed
and MH-1-L34
Installation of reinforced steel bar, embedded item & form closure
2230 KHEP-CI-2230 inspection for RC Grade Beam Cluster 54, B2 NA Division 03 18-Oct-2017 19-Oct-2017 10:00 AM 21-Oct-2017 E Rejected Closed
Cluster 54, B2
Installation of reinforced steel bar, embedded item & form closure
2230.1 KHEP-CI-2230-01 inspection for RC Grade Beam Cluster 54, B2 NA Division 03 22-Oct-2017 23-Oct-2017 10:00 AM 24-Oct-2017 A Approved Closed
Cluster 54, B3
Damproofing surface preparation for RC Grade beam (From Inside)
2231 KHEP-CI-2231 Cluster Cluster 01 A6 NA Division 07 18-Oct-2017 19-Oct-2017 10:00 AM 19-Oct-2017 A Approved Closed
1, A6
First coat, Bituminous damp proofing installation inspection for storm
manholes, precast yard Zone 2B & Line 4 & 27 & Zone 2B & 3B
2232 KHEP-CI-2232
3B & 4B, Line 4 & 27 & 32 & 33, MH-I10-L04 and MH-I98-L27,MH- 32 & 33 & 4B
Division 33 19-Oct-2017 21-Oct-2017 10:00 AM 22-Oct-2017 A Approved Closed
I113-L32 and MH-I121-L33
Blinding Concrete sampling, testing and placement inspection for
Manhole Storm Main Line
2233 KHEP-CI-2233
Zone 1B, Line 9, MH-I22-L09 and MH-I23-L09 and MH-I24-L09
Line 9 Zone 1B Division 31 19-Oct-2017 21-Oct-2017 1:30 PM 22-Oct-2017 A Approved Closed
and MH-I25-L09

Compaction test Excavated formation level bottom foundation Cluster 47,


2234 KHEP-CI-2234
Zone 3B, Cluster 47, BC6 BC6
Zone 3B Division 31 19-Oct-2017 21-Oct-2017 1:30 PM 23-Oct-2017 A Approved Closed

Back filling general fill final layer for pipe trench, Storm main line Dia
400mm Zone 4B, Approved w/
2235 KHEP-CI-2235
Line 33, MH-I121-L33 to MH-I122-L33 and MH-I122-L33 to MH-I123-
Line 33 Zone 4B Division 31 19-Oct-2017 21-Oct-2017 10:00 AM 21-Oct-2017 B comments
Closed
L33
Back filling general fill final layer for pipe trench, Sewer main line Dia
200mm Zone 4B,
Approved w/
2236 KHEP-CI-2236 Line 18 & 19, MH-3-L19 to MH-2-L19 and MH-2-L19 to MH-1-L19 Line 18 & 19 Zone 4B Division 31 19-Oct-2017 21-Oct-2017 10:00 AM 21-Oct-2017 B comments
Closed
and MH-1-L19 to MH-21-L01 and MH-1-L18 to MH-1A-L18 and MH-
1A-L18 to MH-2-L19

Back filling general fill final layer for pipe trench, Sewer main line Dia
200mm Zone 3B, Approved w/
2237 KHEP-CI-2237
Line 2, MH-18-L02 to MH-17-L02 and MH-17-L02 to MH-16-L02 and
Line 2 Zone 3B Division 31 19-Oct-2017 21-Oct-2017 10:00 AM 21-Oct-2017 B comments
Closed
MH-16-L02 to MH-15-L02 and MH-15-L02 to MH-14-L02

Inspection Formwork and concrete Encasement for Storm embedded


2238 KHEP-CI-2238 piece at Manholes Line 11 Zone 1B Division 33 19-Oct-2017 21-Oct-2017 2:00 PM 22-Oct-2017 A Approved Closed
Zone 1B, Line 11, MH-I33-L11 One side, MH-I34-L11 Two Side

Blinding Concrete sampling, testing and placement inspection for


2239 KHEP-CI-2239 Manhole Sewer Main Line Line 8 & 34 Zone 1B Division 31 19-Oct-2017 21-Oct-2017 1:30 PM 22-Oct-2017 A Approved Closed
Zone 1B, Line 8 & 34, MH-1-L08 and MH-1A-L34 and MH-1-L34

Cast in place concrete form work inspection for RC Footing Cluster 67, Approved w/
2240 KHEP-CI-2240
Cluster 67, A4 A4
NA Division 03 19-Oct-2017 21-Oct-2017 10:00 AM 21-Oct-2017 B comments
Closed

Installation of reinforced steel bar, embedded item & form closure


Cluster 67,
2241 KHEP-CI-2241 inspection for RC Footing
A4
NA Division 03 19-Oct-2017 21-Oct-2017 10:00 AM 21-Oct-2017 A Approved Closed
Cluster 67, A4
Concrete sampling, testing and placement inspection for RC Grade
2242 KHEP-CI-2242 Beam Cluster 52, Cluster 52, B2 NA Division 03 19-Oct-2017 21-Oct-2017 9:00 AM 21-Oct-2017 A Approved Closed
B2
Concrete sampling, testing and placement inspection for RC Roof
2243 KHEP-CI-2243 Slab Cluster 12, Cluster 12 B2 NA Division 03 19-Oct-2017 21-Oct-2017 9:00 AM 21-Oct-2017 A Approved Closed
B2
Blinding Concrete sampling, testing and placement inspection for
2244 KHEP-CI-2244 Grade Beam Cluster Cluster 33, B2 NA Division 03 19-Oct-2017 21-Oct-2017 9:00 AM 21-Oct-2017 A Approved Closed
33, B2
Blinding Concrete sampling, testing and placement inspection for
2245 KHEP-CI-2245 Grade Beam Cluster Cluster 34, B2 NA Division 03 19-Oct-2017 21-Oct-2017 9:00 AM 21-Oct-2017 A Approved Closed
34, B2
Blinding Concrete sampling, testing and placement inspection for
2246 KHEP-CI-2246 Grade Beam Cluster Cluster 39, B2 NA Division 03 19-Oct-2017 21-Oct-2017 9:00 AM 21-Oct-2017 A Approved Closed
39, B2
Blinding Concrete sampling, testing and placement inspection for
2247 KHEP-CI-2247 Grade Beam Cluster Cluster 63, B2 NA Division 03 19-Oct-2017 21-Oct-2017 9:00 AM 21-Oct-2017 A Approved Closed
63, B2
Blinding Concrete sampling, testing and placement inspection for
2248 KHEP-CI-2248 Grade Beam Cluster Cluster 64, B2 NA Division 03 19-Oct-2017 21-Oct-2017 9:00 AM 21-Oct-2017 A Approved Closed
64, B2

Second coat dam proofing installation inspection for CMU, Morter and
Cluster 21,
2249 KHEP-CI-2249 Masonry inspection under exterior reinforced grade beam
BC4
NA Division 07 19-Oct-2017 21-Oct-2017 10:30 AM 21-Oct-2017 E Rejected Closed
Cluster 21, BC4

Second coat dam proofing installation inspection for CMU, Morter and
Cluster 21,
2249.1 KHEP-CI-2249-01 Masonry inspection under exterior reinforced grade beam
BC4
NA Division 07 23-Oct-2017 24-Oct-2017 10:00 AM 25-Oct-2017 A Approved Closed
Cluster 21, BC4

Second Coat, Damproofing installation inspection and for RC footing


Cluster 36,
2250 KHEP-CI-2250 & column neck Cluster 36,
BC4
NA Division 07 19-Oct-2017 21-Oct-2017 10:00 AM 21-Oct-2017 E Rejected Closed
BC4
Second Coat, Damproofing installation inspection and for RC footing
Cluster 36, Approved w/
2250.1 KHEP-CI-2250-01 & column neck Cluster 36,
BC4
NA Division 07 25-Oct-2017 26-Oct-2017 10:00 AM 28-Oct-2017 B comments
Closed
BC4
Damproofing surface preparation for RC Grade Beam (From Inside)
2251 KHEP-CI-2251 Cluster Cluster 02 A6 NA Division 07 19-Oct-2017 21-Oct-2017 10:00 AM 22-Oct-2017 E Rejected Closed
2, A6
Damproofing surface preparation for RC Grade Beam (From Inside)
2251.1 KHEP-CI-2251-01 Cluster Cluster 02 A6 NA Division 07 24-Oct-2017 25-Oct-2017 10:00 AM 25-Oct-2017 A Approved Closed
2, A6
Damproofing surface preparation for RC Grade Beam (From Inside)
2252 KHEP-CI-2252 Cluster Cluster 15 B2 NA Division 07 19-Oct-2017 21-Oct-2017 10:00 AM 21-Oct-2017 E Rejected Closed
15, B2
Damproofing surface preparation for RC Grade Beam (From Inside)
2252.1 KHEP-CI-2252-01 Cluster Cluster 15 B2 NA Division 07 24-Oct-2017 25-Oct-2017 10:00 AM 25-Oct-2017 A Approved Closed
15, B2
First coat, Damproofing Installation Inspection for RC Grade Beam
2253 KHEP-CI-2253 (From Inside) Axie (E-J) Cluster 01 A6 NA Division 07 19-Oct-2017 21-Oct-2017 10:00 AM 21-Oct-2017 E Rejected Closed
Cluster 1, A6
First coat, Damproofing Installation Inspection for RC Grade Beam
2253.1 KHEP-CI-2253-01 (From Inside) Axie (E-J) Cluster 01 A6 NA Division 07 24-Oct-2017 25-Oct-2017 10:30 AM 25-Oct-2017 A Approved Closed
Cluster 1, A6
Damproofing surface preparation for RC Grade Beam (From Inside)
Approved w/
2254 KHEP-CI-2254 Cluster Cluster 13 B2 NA Division 07 21-Oct-2017 22-Oct-2017 10:00 AM 23-Oct-2017 B comments
Closed
13, B2
Concrete sampling, testing and placement inspection for RC Grade
Cluster 44, Approved w/
2255 KHEP-CI-2255 Beam Cluster 44,
A6
NA Division 03 21-Oct-2017 22-Oct-2017 9:00 AM 23-Oct-2017 B comments
Closed
A6
Concrete sampling, testing and placement inspection for RC Grade
Cluster 9, Approved w/
2256 KHEP-CI-2256 Beam Cluster 9,
BC4
NA Division 03 21-Oct-2017 22-Oct-2017 9:00 AM 23-Oct-2017 B comments
Closed
BC4
Concrete sampling, testing and placement inspection for RC Column
Cluster 42, Approved w/
2257 KHEP-CI-2257 neck Cluster 42,
BC4
NA Division 03 21-Oct-2017 22-Oct-2017 9:00 AM 23-Oct-2017 B comments
Closed
BC4
Blinding Concrete sampling, testing and placement inspection for
Cluster 70, Approved w/
2258 KHEP-CI-2258 Footing Cluster
BC4
NA Division 03 21-Oct-2017 22-Oct-2017 9:00 AM 23-Oct-2017 B comments
Closed
70, BC4
Blinding Concrete sampling, testing and placement inspection for
Approved w/
2259 KHEP-CI-2259 Grade Beam Cluster 72, B2 NA Division 03 21-Oct-2017 22-Oct-2017 9:00 AM 23-Oct-2017 B comments
Closed
Cluster 72, B2
Installation of reinforced steel bar, embedded item & form closure
Cluster 9,
2260 KHEP-CI-2260 inspection for RC Column (ground Floor)
BC4
NA Division 03 21-Oct-2017 22-Oct-2017 2:00 PM 23-Oct-2017 A Approved Closed
Cluster 9, BC4
Cast in place concrete form work inspection for RC Column (ground
Approved w/
2261 KHEP-CI-2261 Floor) Cluster 20 B2 NA Division 03 21-Oct-2017 22-Oct-2017 10:00 AM 23-Oct-2017 B comments
Closed
Cluster 20, B2
Installation of reinforced steel bar, embedded item & form closure
2262 KHEP-CI-2262 inspection for RC Column (ground Floor) Cluster 52, B2 NA Division 03 21-Oct-2017 22-Oct-2017 10:00 AM 23-Oct-2017 E Rejected Closed
Cluster 52, B2
Installation of reinforced steel bar, embedded item & form closure
2262.1 KHEP-CI-2262-01 inspection for RC Column (ground Floor) Cluster 52, B2 NA Division 03 26-Oct-2017 28-Oct-2017 10:00 AM 30-Oct-2017 A Approved Closed
Cluster 52, B2
Inspection of Reinforcement steel bar and internal shutter for Storm
Manholes (Precast yard) Line 20 & 27
2263 KHEP-CI-2263
Zone 3B & 4B, Line 20 & 27 & 28, MH-I72-L20, MH-I99- & 28
Zone 3B & 4B Division 33 21-Oct-2017 22-Oct-2017 11:30 AM 24-Oct-2017 A Approved Closed
L27 and MH-I102-L28 and MH-I104-L28
Inspection of damproofing surface preparation for storm manholes,
(Precast yard) Zone 2B & 3B & Line 1 & 27 & Zone 2B & 3B
2264 KHEP-CI-2264
4B, Line 1 & 27 & 23 & 31, MH-I97-L27, MH-I8-L01 and MH-I109- 23 & 31 & 4B
Division 33 21-Oct-2017 22-Oct-2017 11:30 AM 24-Oct-2017 A Approved Closed
L31 and MH-I85-L23
Cast in place concrete form work inspection for RC Column Neck
Cluster 77,
2265 KHEP-CI-2265 Cluster 77,
BC4
NA Division 03 22-Oct-2017 23-Oct-2017 10:00 AM 24-Oct-2017 A Approved Closed
BC4
Cast in place concrete form work inspection for RC Column (Ground
2266 KHEP-CI-2266 Floor) Cluster 51, B2 NA Division 03 22-Oct-2017 23-Oct-2017 2:00 PM 24-Oct-2017 A Approved Closed
Cluster 51, B2
Installation of reinforced steel bar, embedded item & form closure
Cluster 40,
2267 KHEP-CI-2267 inspection for RC Column Neck
BC4
NA Division 03 22-Oct-2017 23-Oct-2017 10:00 AM 24-Oct-2017 A Approved Closed
Cluster 40, BC4
Damproofing surface preparation for RC Footing & Column Neck
Cluster 42,
2268 KHEP-CI-2268 Cluster 42,
BC4
NA Division 07 22-Oct-2017 23-Oct-2017 1:30 PM 25-Oct-2017 E Rejected Closed
BC4
Damproofing surface preparation for RC Footing & Column Neck
Cluster 42,
2268.1 KHEP-CI-2268-01 Cluster 42,
BC4
NA Division 07 26-Oct-2017 28-Oct-2017 10:30 AM 28-Oct-2017 A Approved Closed
BC4
Damproofing surface preparation for RC Grade Beam (From Inside)
2269 KHEP-CI-2269 Cluster Cluster 12 B2 NA Division 07 22-Oct-2017 23-Oct-2017 1:30 PM 25-Oct-2017 E Rejected Closed
12, B2
Damproofing surface preparation for RC Grade Beam (From Inside)
2269.1 KHEP-CI-2269-01 Cluster Cluster 12 B2 NA Division 07 26-Oct-2017 28-Oct-2017 10:30 AM 28-Oct-2017 A Approved Closed
12, B2
Damproofing surface preparation for RC Grade Beam (From Inside)
2270 KHEP-CI-2270 Cluster Cluster 14 B2 NA Division 07 22-Oct-2017 23-Oct-2017 1:30 PM 25-Oct-2017 E Rejected Closed
14, B2
Damproofing surface preparation for RC Grade Beam (From Inside)
2270.1 KHEP-CI-2270-01 Cluster Cluster 14 B2 NA Division 07 26-Oct-2017 28-Oct-2017 10:30 AM 28-Oct-2017 A Approved Closed
14, B2
Concrete sampling, testing and placement inspection for RC Column
2271 KHEP-CI-2271 (Ground Floor) Cluster 48, B2 NA Division 03 22-Oct-2017 23-Oct-2017 9:00 AM 24-Oct-2017 A Approved Closed
Cluster 48, B2
Compaction test 1st and final layer Structural fill (Selected fill) Cluster
2272 KHEP-CI-2272
Zone 3B, Cluster 47,BC6 47,BC6
Zone 3B Division 31 22-Oct-2017 23-Oct-2017 2:30 PM 24-Oct-2017 A Approved Closed
Inspection of reinforcement steel brand Form work for base and
concrete pouring for Sewer GRP Manholes
Line 3 & 33 &
2273 KHEP-CI-2273 Zone 1B, Line 3 & 33 & 34, MH-2-
34
Zone 1B Division 33 22-Oct-2017 23-Oct-2017 11:30 AM 24-Oct-2017 A Approved Closed
L03 and MH-3-L03 and MH-1A-L34 and MH-1-L34 and MH-2-L34 and
MH-1A-L33
Inspection Formwork for base & wall and concrete pouring for Storm
Manholes (Precast yard) Line 22 & 27 Approved w/
2274 KHEP-CI-2274
Zone 3B & 4B, Line 22 & 27 & 28, MH-I72-L20, MH-I99- & 28
Zone 3B & 4B Division 33 23-Oct-2017 24-Oct-2017 11:30 AM 26-Oct-2017 B comments
Closed
L27 and MH-I102-L28, MH-I104-L28
Inspection of damproofing surface preparation for storm manholes,
Line 20 & 39
(Precast yard) Zone 1B & 2B,
2275 KHEP-CI-2275
Line 20 & 39 & 17 & 7 & 15, MH-28-L07, MH-70-L20 and MH-136-
& 17 & 7 & Zone 1B & 2B Division 33 23-Oct-2017 24-Oct-2017 3:30 PM 26-Oct-2017 A Approved Closed
15
L39 and MH-50-L15 and MH-51-L15 and MH-56-L17

Concrete sampling, testing and placement inspection for RC Footing Cluster 67, Approved w/
2276 KHEP-CI-2276
Cluster 67, A4 A4
NA Division 03 23-Oct-2017 24-Oct-2017 9:00 AM 25-Oct-2017 B comments
Closed

Damproofing surface preparation for RC Footing & Column Neck


Cluster 56,
2277 KHEP-CI-2277 Cluster 56,
BC4
NA Division 07 23-Oct-2017 24-Oct-2017 2:00 PM 25-Oct-2017 A Approved Closed
BC4
Cast in place concrete form work inspection for RC Column (Ground
2278 KHEP-CI-2278 Floor) Cluster 58, B2 NA Division 03 23-Oct-2017 24-Oct-2017 10:00 AM 25-Oct-2017 A Approved Closed
Cluster 58, B2
Box Closing & Grouting for storm embedded pice at manhole
Approved w/
2279 KHEP-CI-2279 Zone 1B, Line 13 & 16, MH-I39-L13 one Line 13 & 16 Zone 1B Division 33 23-Oct-2017 24-Oct-2017 2:00 PM 26-Oct-2017 B comments
Closed
side, MH-I40-L13 two sides, MH-I53-L16 onw side
Inspection Form work and concrete Pouring for Storm embedded
piece at Manholes
2280 KHEP-CI-2280
Zone 1B, Line 13 & 10, MH-I41-L13 two side, MH-I42-L13 Two
Line 13 & 10 Zone 1B Division 33 23-Oct-2017 24-Oct-2017 2:00 PM 25-Oct-2017 A Approved Closed
Sides, MH-I31-L10 One side
Installation of Sewer GRP Manholes Sewer mani line
Zone 1B, Line 4 & 6 & 7 & 8, Line 4 & 6 &
2281 KHEP-CI-2281
MH-1-L08, MH-4-L08 and MH-1-L06, MH-1-L07 and MH-3-L08 and 7&8
Zone 1B Division 31 23-Oct-2017 24-Oct-2017 1:30 PM 24-Oct-2017 A Approved Closed
MH-1-L04 and MH-2-L04 and MH-2-L08
Installation of reinforced steel bar, embedded item & form closure
Cluster 44,
2282 KHEP-CI-2282 inspection for RC Column (Ground Floor)
A6
NA Division 03 23-Oct-2017 24-Oct-2017 2:00 PM 26-Oct-2017 A Approved Closed
Cluster 44, A6
Cast in place concrete form work inspection for RC Column (Ground
2283 KHEP-CI-2283 Floor) Cluster 71, B2 NA Division 03 23-Oct-2017 24-Oct-2017 10:00 AM 25-Oct-2017 A Approved Closed
Cluster 71, B2
First coat, Damproofing Installation Inspection for RC Grade Beam
2284 KHEP-CI-2284 (From Inside) Axie (J-N) Cluster 01 A6 NA Division 07 24-Oct-2017 25-Oct-2017 10:00 AM 25-Oct-2017 A Approved Closed
Cluster 1, A6
Concrete sampling, testing and placement inspection for RC Column
Approved w/
2285 KHEP-CI-2285 (Ground Floor) Cluster 20 B2 NA Division 03 24-Oct-2017 25-Oct-2017 9:00 AM 26-Oct-2017 B comments
Closed
Cluster 20, B2
Cast in place concrete form work inspection for RC Stair (First Flight)
Cluster 6,
2286 KHEP-CI-2286 Cluster 6,
BC4
NA Division 03 24-Oct-2017 25-Oct-2017 11:00 AM 28-Oct-2017 A Approved Closed
BC4
Installation of reinforced steel bar, embedded item & form closure
Cluster 6,
2287 KHEP-CI-2287 inspection for RC Stair (First Flight)
BC4
NA Division 03 24-Oct-2017 25-Oct-2017 11:00 AM 28-Oct-2017 A Approved Closed
Cluster 6, BC4
Installation of reinforced steel bar, embedded item & form closure
2288 KHEP-CI-2288 inspection for RC Grade beam Cluster 35, B2 NA Division 03 24-Oct-2017 25-Oct-2017 10:00 AM 26-Oct-2017 A Approved Closed
Cluster 35, B2
Cast in place concrete form work inspection for RC Stair (First Flight)
2289 KHEP-CI-2289 Cluster Cluster 48, B2 NA Division 03 24-Oct-2017 25-Oct-2017 10:00 AM 28-Oct-2017 A Approved Closed
48, B2
Installation of reinforced steel bar, embedded item & form closure
2290 KHEP-CI-2290 inspection for RC Stair (First Flight) Cluster 48, B2 NA Division 03 24-Oct-2017 25-Oct-2017 10:00 AM 28-Oct-2017 A Approved Closed
Cluster 48, B2
Cast in place concrete form work inspection for RC Roof Slab
2291 KHEP-CI-2291
Cluster 17, B2
Cluster 17 B2 NA Division 03 24-Oct-2017 25-Oct-2017 10:00 AM 26-Oct-2017 A Approved Closed

Installation of reinforced steel bar, embedded item & form closure


2292 KHEP-CI-2292 inspection for RC Roof Slab Cluster 17 B2 NA Division 03 24-Oct-2017 25-Oct-2017 10:00 AM 26-Oct-2017 A Approved Closed
Cluster 17, B2
70cm, CMU motor and masonry inspection under exterior reinforced
Cluster 50,
2293 KHEP-CI-2293 grade beam Cluster 50,
BC4
NA Division 04 24-Oct-2017 25-Oct-2017 2:00 PM 26-Oct-2017 A Approved Closed
BC4
70cm, CMU motor and masonry inspection under exterior reinforced
Cluster 23,
2294 KHEP-CI-2294 grade beam Cluster 23,
BC4
NA Division 04 24-Oct-2017 25-Oct-2017 2:00 PM 26-Oct-2017 A Approved Closed
BC4
Inspection of reinforcement steel brand Form work for base and
concrete pouring for Sewer GRP Manholes (Precast yard)
2295 KHEP-CI-2295 Zone 1B, Line 2, Line 2 Zone 1B Division 33 24-Oct-2017 25-Oct-2017 11:30 AM 26-Oct-2017 A Approved Closed
MH-2A-L02 and MH-1-L02 and MH-4-L02 and MH-5-L02 and MH-6-
L02 and MH-8-L02
Inspection of reinforcement steel brand Form work for base and
concrete pouring for Sewer GRP Manholes (Precast yard)
2296 KHEP-CI-2296 Zone 1B, Line 2, Line 2 Zone 1B Division 33 24-Oct-2017 25-Oct-2017 11:30 AM 26-Oct-2017 A Approved Closed
MH-2-L02 and MH-3-L02 and MH-5A-L02 and MH-7-L02 and MH-9-
L02
Inspection of damproofing surface preparation for storm manholes
2297 KHEP-CI-2297 Zone 2B, Line 8, Line 8 Zone 2B Division 33 24-Oct-2017 25-Oct-2017 3:30 PM 28-Oct-2017 A Approved Closed
MH-21-L08, MH-26-L08 and MH-26A-L08
First Coat, Damproofing installation inspection For Grade Beam
2298 KHEP-CI-2298 (From Inside) Cluster 13, Cluster 13 B2 NA Division 07 25-Oct-2017 26-Oct-2017 10:30 AM 28-Oct-2017 A Approved Closed
B2
First Coat, Damproofing installation inspection For Rc Footing &
Cluster 37,
2299 KHEP-CI-2299 Column neck Cluster
BC4
NA Division 07 25-Oct-2017 26-Oct-2017 10:00 AM 28-Oct-2017 A Approved Closed
37, BC4
First Coat, Damproofing installation inspection For Rc Footing &
Cluster 55,
2300 KHEP-CI-2300 Column neck Cluster
BC4
NA Division 07 25-Oct-2017 26-Oct-2017 10:00 AM 28-Oct-2017 A Approved Closed
55, BC4
First Coat, Damproofing installation inspection For Rc Footing &
Cluster 25,
2301 KHEP-CI-2301 Column neck Cluster
BC4
NA Division 07 25-Oct-2017 26-Oct-2017 10:00 AM 28-Oct-2017 A Approved Closed
25, BC4
Check the survey work, elevation and coordinate for billnding under
Footing Cluster 47, Approved w/
2302 KHEP-CI-2302
Cluster 47, BC6 BC6
NA Division 03 25-Oct-2017 26-Oct-2017 2:00 PM 26-Oct-2017 B comments
Closed

Concrete sampling, testing and placement inspection for RC Column


Cluster 77, Approved w/
2303 KHEP-CI-2303 Neck Cluster 77,
BC4
NA Division 03 25-Oct-2017 26-Oct-2017 9:00 AM 28-Oct-2017 B comments
Closed
BC4
Concrete sampling, testing and placement inspection for RC Column
Approved w/
2304 KHEP-CI-2304 (Ground Floor) Cluster 51, B2 NA Division 03 25-Oct-2017 26-Oct-2017 9:00 AM 28-Oct-2017 B comments
Closed
Cluster 51, B2
Concrete sampling, testing and placement inspection for RC Grade
Approved w/
2305 KHEP-CI-2305 Beam Cluster 54, Cluster 54, B2 NA Division 03 25-Oct-2017 26-Oct-2017 9:00 AM 28-Oct-2017 B comments
Closed
B2
Cast in place concrete form work inspection for RC Roof Slab
2306 KHEP-CI-2306
Cluster 68, B2
Cluster 68, B2 NA Division 03 25-Oct-2017 26-Oct-2017 10:00 AM 28-Oct-2017 A Approved Closed

Installation of reinforced steel bar, embedded item & form closure


2307 KHEP-CI-2307 inspection for RC Roof Slab Cluster 68, B2 NA Division 03 25-Oct-2017 26-Oct-2017 10:00 AM 28-Oct-2017 A Approved Closed
Cluster 68, B2

Cast in place concrete form work inspection for RC Grade Beam


2308 KHEP-CI-2308
Cluster 27, B2
Cluster 27, B2 NA Division 03 25-Oct-2017 26-Oct-2017 1:30 PM 28-Oct-2017 A Approved Closed

Installation of reinforced steel bar, embedded item & form closure


2309 KHEP-CI-2309 inspection for RC Grade Beam Cluster 27, B2 NA Division 03 25-Oct-2017 26-Oct-2017 1:30 PM 28-Oct-2017 A Approved Closed
Cluster 27, B2
Cast in place concrete form work inspection for RC Column (Ground
Cluster 9, Approved w/
2310 KHEP-CI-2310 Floor)
BC4
NA Division 03 25-Oct-2017 26-Oct-2017 10:00 AM 28-Oct-2017 B comments
Closed
Cluster 9, BC4
First Coat, Bituminous Damproofing installation inspection for storm
manholes, precast yard Line 1 & 27 & Zone 2B & 3B
2311 KHEP-CI-2311
Zone 2B & 3B & 4B, Line 1 & 27 & 23 & 31, MH-I97-L27, MH-I8-L01 23 & 31 & 4B
Division 33 25-Oct-2017 26-Oct-2017 11:30 AM 28-Oct-2017 A Approved Closed
and MH-I109-L31 and MH-I85-L23
Inspection of reinforcement steel brand Form work for base and
concrete pouring for Sewer GRP Manholes (Precast yard)
2312 KHEP-CI-2312 Zone 1B, Line 1, Line 1 Zone 1B Division 33 25-Oct-2017 26-Oct-2017 11:30 AM 28-Oct-2017 A Approved Closed
MH-2-L01 and MH-1-L01 and MH-3-L01 and MH-4-L01 and MH-6-L01
and MH-7-L01 and MH-8-L01
Back filling general fill final layer for pipe trench, Sewer main line Dia
200mm Zone 2B,
2313 KHEP-CI-2313 Line 11 & 12, MH-3-L12 to MH-2-L12 and MH-2-L12 to MH-1-L12 Line 11 & 12 Zone 2B Division 31 25-Oct-2017 26-Oct-2017 10:00 AM 28-Oct-2017 A Approved Closed
and MH-1-L12 to MH-12-L01 and MH-1-L11 to MH-1A-L11 and MH-
1A-L11 to MH-2-L12
Back filling general fill final layer for pipe trench, Storm main line Dia
2314 KHEP-CI-2314 400mm Zone 2B, Line 1 Zone 2B Division 31 25-Oct-2017 26-Oct-2017 10:00 AM 28-Oct-2017 A Approved Closed
Line 1, MH-6-L01 to MH-I8-L01
First Coat, Damproofing installation inspection For Rc Grade Beam
2315 KHEP-CI-2315 (From Inside) Cluster Cluster 15 B2 NA Division 07 26-Oct-2017 28-Oct-2017 10:00 AM 28-Oct-2017 A Approved Closed
15, B2
Second Coat, Damproofing installation inspection For Rc Grade Beam
2316 KHEP-CI-2316 (From Inside) Cluster Cluster 01 A6 NA Division 07 26-Oct-2017 28-Oct-2017 10:00 AM 28-Oct-2017 A Approved Closed
1, A6
First Coat, Damproofing installation inspection For Rc Grade Beam
2317 KHEP-CI-2317 (From Inside) Cluster Cluster 02 A6 NA Division 07 26-Oct-2017 28-Oct-2017 10:00 AM 28-Oct-2017 A Approved Closed
2, A6
Concrete sampling, testing and placement inspection for RC Parapet
2318 KHEP-CI-2318 (Roof Slab) Cluster 02 A6 NA Division 03 26-Oct-2017 28-Oct-2017 9:00 AM 29-Oct-2017 A Approved Closed
Cluster 2, A6
Concrete sampling, testing and placement inspection for RC Stair
Cluster 6,
2319 KHEP-CI-2319 First Flight
BC4
NA Division 03 26-Oct-2017 28-Oct-2017 9:00 AM 29-Oct-2017 A Approved Closed
Cluster 6, BC4
Concrete sampling, testing and placement inspection for RC Column
2320 KHEP-CI-2320 (Ground Floor) Cluster 58, B2 NA Division 03 26-Oct-2017 28-Oct-2017 9:00 AM 29-Oct-2017 A Approved Closed
Cluster 58, B2
Damproofing surface preparation for RC Footing & Column Neck
Cluster 76,
2321 KHEP-CI-2321 Cluster 76,
BC4
NA Division 07 26-Oct-2017 28-Oct-2017 11:00 AM 30-Oct-2017 A Approved Closed
BC4
Second Coat, Damproofing installation inspection For Rc Footing &
Cluster 37,
2322 KHEP-CI-2322 Column Neck Cluster
BC4
NA Division 07 26-Oct-2017 28-Oct-2017 10:00 AM 28-Oct-2017 A Approved Closed
37, BC4
70cm, CMU motor and masonry inspection under exterior reinforced
Cluster 60,
2323 KHEP-CI-2323 grade beam Cluster 60,
BC4
NA Division 04 26-Oct-2017 28-Oct-2017 2:00 PM 28-Oct-2017 A Approved Closed
BC4
Check the survey work, elevation and coordinate for billnding under
Footing Cluster 49, Approved w/
2324 KHEP-CI-2324
Cluster 49, BC6 BC6
NA Division 03 26-Oct-2017 28-Oct-2017 2:00 PM 28-Oct-2017 B comments
Closed

Installation Inspection of Precast Storm Drainage manholes


Zone 2B, Line 7 & 4 & 3 & 5, Line 7 & 4 &
2325 KHEP-CI-2325
MH-27-L07 to MH-28-L07 and MH-I11-L05 to MH-I7-L03 and MH- 3&5
Zone 2B Division 33 26-Oct-2017 28-Oct-2017 11:00 AM 29-Oct-2017 A Approved Closed
I12-L04
First Coat, Bituminous Damproofing installation inspection for storm
Line 20 & 39
manholes, precast yard
2326 KHEP-CI-2326
Zone 1B & 2B, Line 20 & 39 & 17 & 7 & 15, MH-28-L07, MH-70-L20
& 17 & 7 & Zone 1B & 2B Division 33 26-Oct-2017 28-Oct-2017 3:30 PM 29-Oct-2017 A Approved Closed
15
and MH-136-L39 and MH-50-L15 and MH-51-L15 and MH-56-L17

Inspection of concrete pouring for Sewer GRP Manholes, precast


yard Zone 1B, Line
2327 KHEP-CI-2327
1, MH-2-L01, MH-1-L01 and MH-3-L01 and MH-4-L01 and MH-6-L01
Line 1 Zone 1B Division 33 26-Oct-2017 28-Oct-2017 11:30 AM 28-Oct-2017 A Approved Closed
and MH-7-L01 and MH-8-L01
Inspection of reinforcement steel brand Form work for base for
Sewer GRP Manholes (Precast ard)
Zone 2B & 3B & 4B, Line 1, MH-5-L01 Zone 2B & 3B
2328 KHEP-CI-2328
and MH-9-L01 and MH-10-L01 and MH-22-L01 and MH-12-L01 and
Line 1
& 4B
Division 33 26-Oct-2017 28-Oct-2017 11:30 AM 29-Oct-2017 A Approved Closed
MH-13-L01 and MH-14-L01 and MH-15-L01 and MH-16-L01 and MH-
19-L01 and MH-20-L01 and MH-21-L01

Inspection of concrete pouring for Sewer GRP Manholes, precast


yard Zone 2B & 3B
Zone 2B & 3B
2329 KHEP-CI-2329 & 4B, Line 1, MH-5-L01, MH-9-L01 and MH-10-L01 and MH-22-L01 Line 1
& 4B
Division 33 26-Oct-2017 28-Oct-2017 11:30 AM 29-Oct-2017 A Approved Closed
and MH-12-L01 and MH-13-L01 and MH-14-L01 and MH-15-L01, MH-
16-L01 and MH-19-L01 and MH-20-L01 and MH-21-L01

First Coat, Damproofing installation inspection For Rc Footing &


Cluster 56,
2330 KHEP-CI-2330 Column Neck Cluster 56,
BC4
NA Division 07 26-Oct-2017 28-Oct-2017 10:00 AM 30-Oct-2017 A Approved Closed
BC4 B2
Compaction Test for backfiling Final layer under Grade on Slab at
Cluster 69 Mockup Villa B
2331 KHEP-CI-2331
Cluster 69, B2
NA Division 33 26-Oct-2017 28-Oct-2017 1:30 PM 23-Nov-2017 A Approved Closed

Compaction Test for backfiling of Pre Final layer under Grade on Slab
at Cluster 1 Villa 2 Approved w/
2332 KHEP-CI-2332
Cluster 1, A6
Cluster 01 A6 NA Division 33 26-Oct-2017 28-Oct-2017 2:00 PM 1-Nov-2017 B comments
Closed

Compaction Test for backfiling Select Fill Final layer under Grade on
Slab at Cluster 1 Villa 3 & 4 Approved w/
2333 KHEP-CI-2333
Cluster 1, A6
Cluster 01 A6 NA Division 33 26-Oct-2017 28-Oct-2017 2:30 PM 4-Nov-2017 E comments
Closed

Termite control surface preparation, installation and final inspection


Cluster 47,
2334 KHEP-CI-2334 for Footing Cluster
BC6
NA Division 03 28-Oct-2017 29-Oct-2017 10:00 AM 30-Oct-2017 A Approved Closed
47, BC6
Blinding Concrete sampling, testing and placement inspection for
Cluster 47, Approved w/
2335 KHEP-CI-2335 Footing Cluster
BC6
NA Division 03 28-Oct-2017 29-Oct-2017 1:00 PM 30-Oct-2017 B comments
Closed
47, BC6
Concrete sampling, testing and placement inspection for Rc Grade
Approved w/
2336 KHEP-CI-2336 Beam Cluster 27, Cluster 27, B2 NA Division 03 28-Oct-2017 29-Oct-2017 9:00 AM 30-Oct-2017 B comments
Closed
B2
Concrete sampling, testing and placement inspection for Rc Column
Approved w/
2337 KHEP-CI-2337 (Ground Floor) Cluster 71, B2 NA Division 03 28-Oct-2017 29-Oct-2017 9:00 AM 30-Oct-2017 B comments
Closed
Cluster 71, B2
Concrete sampling, testing and placement inspection for Rc Roof
Approved w/
2338 KHEP-CI-2338 Slab Cluster 17, Cluster 17 B2 NA Division 03 28-Oct-2017 29-Oct-2017 9:00 AM 30-Oct-2017 B comments
Closed
B2
Installation of reinforced steel bar, embedded item & form closure
2339 KHEP-CI-2339 inspection for RC Column (Ground Floor) Cluster 54, B2 NA Division 03 28-Oct-2017 29-Oct-2017 10:00 AM 30-Oct-2017 A Approved Closed
Cluster 54, B2
Cast in place concrete form work inspection for RC Roof Slab Approved w/
2340 KHEP-CI-2340
Cluster 5, B2
Cluster 5, B2 NA Division 03 28-Oct-2017 29-Oct-2017 10:00 AM 30-Oct-2017 B comments
Closed

Installation of reinforced steel bar, embedded item & form closure


Approved w/
2341 KHEP-CI-2341 inspection for RC Roof Slab Cluster 5, B2 NA Division 03 28-Oct-2017 29-Oct-2017 10:00 AM 30-Oct-2017 B comments
Closed
Cluster 5, B2
Cast in place concrete form work inspection for RC Stair First Flight
2342 KHEP-CI-2342 Cluster 58, Cluster 58, B2 NA Division 03 28-Oct-2017 29-Oct-2017 2:00 PM 30-Oct-2017 A Approved Closed
B2
Installation of reinforced steel bar, embedded item & form closure
2343 KHEP-CI-2343 inspection for RC Stair First Flight Cluster 58, B2 NA Division 03 28-Oct-2017 29-Oct-2017 2:00 PM 30-Oct-2017 A Approved Closed
Cluster 58, B2
70cm, CMU motor and masonry inspection under exterior reinforced
Cluster 18
2344 KHEP-CI-2344 grade beam Cluster 18,
BC4
NA Division 04 28-Oct-2017 29-Oct-2017 2:00 PM 29-Oct-2017 A Approved Closed
BC4
Check the survey work, elevation and coordinate for billnding under
Grade Beam Cluster 45,
2345 KHEP-CI-2345
Cluster 45, A6 A6
NA Division 03 28-Oct-2017 29-Oct-2017 2:00 PM 30-Oct-2017 A Approved Closed

Installation of reinforced steel bar, embedded item & form closure


2346 KHEP-CI-2346 inspection for RC Column (Ground Floor) Cluster 27, B2 NA Division 03 28-Oct-2017 29-Oct-2017 1:30 PM 30-Oct-2017 A Approved Closed
Cluster 27, B2
Cast in place concrete form work inspection for RC Column Neck
Cluster 40,
2347 KHEP-CI-2347 Cluster 40,
BC4
NA Division 03 28-Oct-2017 29-Oct-2017 11:00 AM 30-Oct-2017 A Approved Closed
BC4
Inspection Form work and concrete Pouring for Storm embedded
piece at Manholes
2348 KHEP-CI-2348
Zone 1B, Line 13 & 16, MH-I39-L13 One side, MH-I40-L13 Two
Line 13 & 16 Zone 1B Division 33 28-Oct-2017 29-Oct-2017 2:00 PM 30-Oct-2017 A Approved Closed
Sides, MH-I53-L16 One side
Inspection of excavated and Compaction formation for sewer
manholes - Sewer main line
2349 KHEP-CI-2349
Zone 4B, Line 1, MH-16-L01 and MH-19-L01 and
Line 1 Zone 4B Division 31 28-Oct-2017 29-Oct-2017 1:30 PM 30-Oct-2017 A Approved Closed
MH-17-L01 to MH-20-L01 and MH-18-L01 to MH-21-L01

Sampling Aggregate base course (Goden paradise.EST) Jobsite Stock


2350 KHEP-CI-2350
Jobsite Stock pile 15 pile 15
NA Division 31 28-Oct-2017 29-Oct-2017 10:30 AM 30-Oct-2017 A Approved Closed

Sampling of 3/8 Aggregate for bedding under S.Sewer pipes under


Jobsite Stock Approved w/
2351 KHEP-CI-2351 water table level (Goden paradise.EST)
pile 16
NA Division 31 28-Oct-2017 29-Oct-2017 10:30 AM 30-Oct-2017 B comments
Closed
Jobsite Stock pile 16
Damproofing surface preparation for RC Footing & Column Neck
Cluster 78,
2352 KHEP-CI-2352 Cluster 78,
BC4
NA Division 31 28-Oct-2017 29-Oct-2017 2:30 PM 30-Oct-2017 A Approved Closed
BC4
Second Coat, Damproofing installation inspection For Rc Footing &
Cluster 25,
2353 KHEP-CI-2353 Column Cluster 25,
BC4
NA Division 07 28-Oct-2017 29-Oct-2017 10:00 AM 30-Oct-2017 A Approved Closed
BC4
Second Coat, Damproofing installation inspection For Rc Grade Beam
2354 KHEP-CI-2354 (From Inside) Cluster Cluster 13 B2 NA Division 07 28-Oct-2017 29-Oct-2017 10:00 AM 30-Oct-2017 A Approved Closed
13, B2
Second Coat, Damproofing installation inspection For Rc Grade Beam
Cluster 55,
2355 KHEP-CI-2355 (From Inside) Cluster
BC4
NA Division 07 28-Oct-2017 29-Oct-2017 10:00 AM 30-Oct-2017 A Approved Closed
55, BC4

Inspection of damproofing surface preparation for storm manholes


(Precast yard) Zone 1B & 2B & Line 7 & 15 & Zone 1B & 2B
2356 KHEP-CI-2356
3B, Line 7 & 15 & 22 & 35, MH-29-L07, MH-52-L15 and MH-54-L15 22 & 35 & 3B
Division 33 29-Oct-2017 30-Oct-2017 11:30 AM 30-Oct-2017 A Approved Closed
and MH-90-L22 and MH-91-L22 and MH-132-L35
Second Coat, Damproofing installation inspection For Rc Grade Beam
2357 KHEP-CI-2357
(From Inside) Cluster 15, B2
Cluster 15 B2 NA Division 07 29-Oct-2017 30-Oct-2017 10:00 AM 30-Oct-2017 A Approved Closed

Second Coat, Damproofing installation inspection For Rc Grade Beam


2358 KHEP-CI-2358
(From Inside) Cluster 2, A6
Cluster 02 A6 NA Division 07 29-Oct-2017 30-Oct-2017 10:00 AM 30-Oct-2017 A Approved Closed

Second Coat, Damproofing installation inspection For Column Neck & Cluster 56,
2359 KHEP-CI-2359
Footing Cluster 56, BC4 BC4
NA Division 07 29-Oct-2017 30-Oct-2017 10:00 AM 30-Oct-2017 A Approved Closed

First Coat, Damproofing installation inspection For Rc Grade Beam


2360 KHEP-CI-2360
(From Inside) Cluster 12, B2
Cluster 12 B2 NA Division 07 29-Oct-2017 30-Oct-2017 2:00 PM 30-Oct-2017 A Approved Closed

First Coat, Damproofing installation inspection For Rc Grade Beam


2361 KHEP-CI-2361
(From Inside) Cluster 14, B2
Cluster 14 B2 NA Division 07 29-Oct-2017 30-Oct-2017 2:00 PM 30-Oct-2017 A Approved Closed

First coat dam proofing installation inspection for CMU, Morter and
Cluster 46,
2362 KHEP-CI-2362 Masonry inspection under exterior reinforced grade beam
A6
NA Division 07 29-Oct-2017 30-Oct-2017 10:00 AM 1-Nov-2017 A Approved Closed
Cluster 46, A6

Cast in place concrete form work inspection for RC Column (Ground Cluster 44,
2363 KHEP-CI-2363
Floor) Axis (H-to-N) Cluster 44, A6 A6
NA Division 03 29-Oct-2017 30-Oct-2017 2:30 PM 1-Nov-2017 A Approved Closed

First coat dam proofing installation inspection for CMU, Morter and
Cluster 65, Approved w/
2364 KHEP-CI-2364 Masonry inspection under exterior reinforced grade beam
A6
NA Division 07 29-Oct-2017 30-Oct-2017 10:00 AM 1-Nov-2017 B comments
Closed
Cluster 65, A6
First coat dam proofing installation inspection for CMU, Morter and
Cluster 24,
2365 KHEP-CI-2365 Masonry inspection under exterior reinforced grade beam
BC4
NA Division 07 29-Oct-2017 30-Oct-2017 10:00 AM 1-Nov-2017 A Approved Closed
Cluster 24, BC4
Cast in place concrete form work inspection for RC Grade Beam Approved w/
2366 KHEP-CI-2366
Cluster 35, B2
Cluster 35, B2 NA Division 03 29-Oct-2017 30-Oct-2017 2:30 PM 1-Nov-2017 B comments
Closed
Compaction Test for backfiling Final layer under Grade on Slab at
Cluster 1, Villa 3 & 4 Approved w/
2367 KHEP-CI-2367
Zone 1B, Cluster 1, A6
Cluster 01 A6 Zone 1B Division 31 29-Oct-2017 30-Oct-2017 2:30 PM 1-Nov-2017 B comments
Closed

Box Closing & Grouting for Storm Embedded pice at manholes


Approved w/
2368 KHEP-CI-2368 Zone 2B, Line 8, MH-21-L08 One side, MH-26A-L08 Two Sides, MH- Line 8 Zone 2B Division 33 29-Oct-2017 30-Oct-2017 2:00 PM 1-Nov-2017 B comments
Closed
26-L08 One side
Inspection of excavated and Compaction formation for pipe trench
storm main line Dia 500 mm
2369 KHEP-CI-2369 Zone 1B, Line15, MH-47-L15 and MH-48-L15 and MH-48-L15 to MH- Line15 Zone 1B Division 31 30-Oct-2017 31-Oct-2017 11:00 AM 1-Nov-2017 A Approved Closed
49-L15 and MH-49-L15 and MH-50-L15 and MH-50-L15 to MH-51-
L15 and MH-51-L15 to MH-52-L15
Inspection of excavated formation for storm manholes - storm main
line
2370 KHEP-CI-2370
Zone 1B, Line 15, MH-47-L15 and MH-48-L15, MH-49-L15 and MH-
Line 15 Zone 1B Division 31 30-Oct-2017 31-Oct-2017 1:30 PM 1-Nov-2017 A Approved Closed
50-L15 and MH-51-L15 and MH-52-L15
Inspection of reinforcement steel bar and Form work and concrete
2371 KHEP-CI-2371 pouring for Protection slab (9pic) Line 28 Zone 3B Division 33 30-Oct-2017 31-Oct-2017 11:30 AM 1-Nov-2017 A Approved Closed
Zone 3B, Line 28, MH-I102-L28 and MH-I104-L28

First Coat, Bituminous Damproofing installation inspection for storm


manholes, precast yard Line 7 & 15 Zone 1B & 2B
2372 KHEP-CI-2372
Zone 1B & 2B & 3B, Line 7 & 15 & 22 & 35, MH-29-L07, MH-52-L15 & 22 & 35 & 3B
Division 33 30-Oct-2017 31-Oct-2017 11:30 AM 1-Nov-2017 A Approved Closed
and MH-54-L15 and MH-90-L22 and MH-91-L22 and MH-132-L35

Building concrete sampling, testing and placement inspection for


manholes, Sewer main line
2373 KHEP-CI-2373
Zone 4B, Line 1, MH-16-L01 and MH-19-L01, MH-17-L01 and MH-20-
Line 1 Zone 4B Division 31 30-Oct-2017 31-Oct-2017 1:30 PM 1-Nov-2017 A Approved Closed
L01 and MH-18-L01 and MH-21-L01

Inspection of reinforcement steel bar and Form work for base for
Sewer GRP Manholes (Precast ard)
2374 KHEP-CI-2374
Zone 2B & 4B, Line 1, MH-11-L01 and MH-17-L01 and MH-18-L01
Line 1 Zone 2B & 4B Division 33 30-Oct-2017 31-Oct-2017 10:00 AM 1-Nov-2017 A Approved Closed
and MH-23-L01 and MH-24-L01 and MH-25-L01 and MH-26-L01 and

Compaction Test for backfiling of Pre Final layer under slab on Grade
2375 KHEP-CI-2375 at Cluster 15 From Axis (C) to (E) Zone Cluster 15 B2 Zone 1B Division 31 30-Oct-2017 31-Oct-2017 2:30 PM 5-Nov-2017 A Approved Closed
1B, Cluster 15, B2
Termite control surface preparation, installation and final inspection
Cluster 49,
2376 KHEP-CI-2376 for Footing Cluster
BC6
NA Division 03 30-Oct-2017 31-Oct-2017 10:00 AM 31-Oct-2017 A Approved Closed
49, BC6
Termite control surface preparation, installation and final inspection
Cluster 45,
2377 KHEP-CI-2377 for Grade Beam Cluster
A6
NA Division 03 30-Oct-2017 31-Oct-2017 10:00 AM 31-Oct-2017 A Approved Closed
45, A6

Back filling general fill final layer for pipe trench, Sewer main line Dia
200mm Zone 3B,
2378 KHEP-CI-2378 Line 15 & 16, MH-4-L16 to MH-3-L16 and MH-3-L16 to MH-3A-L16 Line 15 & 16 Zone 3B Division 31 31-Oct-2017 1-Nov-2017 10:00 AM 1-Nov-2017 A Approved Closed
and MH-3A-L16 to MH-2-L16 and MH-2-L16 to MH-1-L16 and MH-1-
L16 to MH-16-L16 and MH-1-L15 to MH-2-L16

Second Coat, Damproofing installation inspection For Grade beam


2379 KHEP-CI-2379 (From Inside) Cluster Cluster 12 B2 NA Division 03 31-Oct-2017 1-Nov-2017 10:00 AM 1-Nov-2017 A Approved Closed
12, B2
Second Coat, Damproofing installation inspection For Grade beam
2380 KHEP-CI-2380 (From Inside) Cluster Cluster 14 B2 NA Division 03 31-Oct-2017 1-Nov-2017 10:00 AM 1-Nov-2017 A Approved Closed
14, B2
Concrete sampling, testing and placement inspection for Rc Roof
Approved w/
2381 KHEP-CI-2381 Slab Cluster 68, Cluster 68, B2 NA Division 03 31-Oct-2017 1-Nov-2017 9:00 AM 1-Nov-2017 B comments
Closed
B2
Concrete sampling, testing and placement inspection for Rc Roof
Approved w/
2382 KHEP-CI-2382 Slab Cluster 48, Cluster 48, B2 NA Division 03 31-Oct-2017 1-Nov-2017 9:00 AM 1-Nov-2017 B comments
Closed
B2
Concrete sampling, testing and placement inspection for Rc Stair
2383 KHEP-CI-2383 First Flight Cluster 58, B2 NA Division 03 31-Oct-2017 1-Nov-2017 9:00 AM 1-Nov-2017 A Approved Closed
Cluster 58, B2
Blinding Concrete sampling, testing and placement inspection for
Cluster 49, Approved w/
2384 KHEP-CI-2384 Footing Cluster
BC6
NA Division 03 31-Oct-2017 1-Nov-2017 9:00 AM 1-Nov-2017 B comments
Closed
49, BC6
Damproofing surface preparation for RC Footing & Column Neck
Cluster 77,
2385 KHEP-CI-2385 Cluster 77,
BC4
NA Division 07 31-Oct-2017 1-Nov-2017 10:30 AM 1-Nov-2017 A Approved Closed
BC4
Damproofing surface preparation for RC Footing & Column Neck
Cluster 41,
2386 KHEP-CI-2386 Cluster 41,
BC4
NA Division 07 31-Oct-2017 1-Nov-2017 2:00 PM 4-Nov-2017 A Approved Closed
BC4
Installation of reinforced steel bar, embedded item & form closure
Cluster 67,
2387 KHEP-CI-2387 inspection for RC Column Neck
A4
NA Division 03 31-Oct-2017 1-Nov-2017 10:00 AM 1-Nov-2017 A Approved Closed
Cluster 67, A4
Back filling general fill final layer for pipe trench, Storm main line Dia
400mm Zone 3B,
2388 KHEP-CI-2388
Line 29 & 28, MH-I103-L29 to MH-I104-L28 and MH-I104-L28 to
Line 29 & 28 Zone 3B Division 31 31-Oct-2017 1-Nov-2017 10:00 AM 1-Nov-2017 A Approved Closed
MH-105-L27
Box Closing & Grouting for Storm Embedded pice at manhole
2389 KHEP-CI-2389 Zone 4B, Line 22, MH-83-L22 One side, MH-84-L22 Two Sides, MH- Line 22 Zone 4B Division 33 31-Oct-2017 1-Nov-2017 2:00 PM 4-Nov-2017 A Approved Closed
87-L22 One side and MH-88-L22 One Side
Inspection of excavated and Compaction formation for Storm
2390 KHEP-CI-2390 Manholes Storm main line Zone Line7 Zone 1B Division 31 31-Oct-2017 1-Nov-2017 1:30 PM 1-Nov-2017 A Approved Closed
1B, Line 7, MH-20-L07

Inspection of concrete pouring for Sewer GRP Manholes, precast


yard Zone 2B &
2391 KHEP-CI-2391
4B, Line 1, MH-11-L01, MH-17-L01 and MH-18-L01 and MH-23-L01
Line 1 Zone 2B & 4B Division 33 31-Oct-2017 1-Nov-2017 10:00 AM 4-Nov-2017 A Approved Closed
and MH-24-L01 and MH-25-L01 and MH-26-L01

Inspection of excavated and Compaction formation for pipe trench


2392 KHEP-CI-2392 Sewer main Line Dia 200mm Line 1 Zone 4B Division 31 31-Oct-2017 1-Nov-2017 11:00 AM 1-Nov-2017 A Approved Closed
Zone 4B, Line 1, MH-22-L01 to MH-21-L01
Sampling - Aggregate sub base materials (saad areemat.EST) JobsiteStock Approved w/
2393 KHEP-CI-2393
JobsiteStock file 17 file 17
NA Division 31 31-Oct-2017 1-Nov-2017 10:30 AM 4-Nov-2017 B comments
Closed

Sampling - Aggregate sub base materials (saad areemat.EST) JobsiteStock


2393.1 KHEP-CI-2393-01
JobsiteStock file 17 file 17
NA Division 31 30-Dec-2017 31-Dec-2017 10:30 AM 1-Jan-2018 A Approved Closed
Check the survey work, elevation and coordinate for billnding under
Footing Cluster 38,
2394 KHEP-CI-2394
Cluster 38, BC6 BC6
NA Division 03 31-Oct-2017 1-Nov-2017 2:00 PM 1-Nov-2017 A Approved Closed

Cast in place concrete form work inspection for RC Footing Cluster Cluster 39,
2395 KHEP-CI-2395
39, BC6 BC6
NA Division 03 31-Oct-2017 1-Nov-2017 10:00 AM 1-Nov-2017 A Approved Closed

Installation of reinforced steel bar, embedded item & form closure Cluster 39,
2396 KHEP-CI-2396
inspection for RC Footing Cluster 39, BC6 BC6
NA Division 03 31-Oct-2017 1-Nov-2017 10:00 AM 1-Nov-2017 A Approved Closed
Inspection Form work and concrete Pouring for Sewer embedded
piece at Manholes Line 3 & 4 &
2397 KHEP-CI-2397
Zone 1B, Line 3 & 4 & 5, MH-1-L03 and MH-1A-L03 and MH-1- 5
Zone 1B Division 31 1-Nov-2017 2-Nov-2017 11:30 AM 4-Nov-2017 A Approved Closed
L04 and MH-1-L05
Building concrete sampling, testing and placement inspection for
manholes, Storm main line
2398 KHEP-CI-2398
Zone 1B, Line 15, MH-47-L15 and MH-48-L15, MH-49-L15 and MH-
Line 15 Zone 1B Division 31 1-Nov-2017 2-Nov-2017 1:30 PM 4-Nov-2017 A Approved Closed
50-L15 and MH-51-L15 and MH-52-L15
Concrete sampling, testing and placement inspection for Rc Column
Cluster 40, Approved w/
2399 KHEP-CI-2399 Neck Cluster 40,
BC4
NA Division 03 1-Nov-2017 2-Nov-2017 9:00 AM 4-Nov-2017 B comments
Closed
BC4
Concrete sampling, testing and placement inspection for Rc Grade
Approved w/
2400 KHEP-CI-2400 Beam Cluster 35, Cluster 35, B2 NA Division 03 1-Nov-2017 2-Nov-2017 9:00 AM 4-Nov-2017 B comments
Closed
B2
Cast in place concrete form work inspection for RC Column Neck
Cluster 74,
2401 KHEP-CI-2401 Cluster 74,
BC4
NA Division 03 1-Nov-2017 2-Nov-2017 11:00 AM 4-Nov-2017 A Approved Closed
BC4
Cast in place concrete form work inspection for RC Footing Cluster 47,
2402 KHEP-CI-2402
Cluster 47, BC6 BC6
NA Division 03 1-Nov-2017 2-Nov-2017 11:00 AM 4-Nov-2017 A Approved Closed

Installation of reinforced steel bar, embedded item & form closure Cluster 47,
2403 KHEP-CI-2403
inspection for RC Footing Cluster 47, BC6 BC6
NA Division 03 1-Nov-2017 2-Nov-2017 11:00 AM 4-Nov-2017 A Approved Closed

Cast in place concrete form work inspection for RC Column Ground


2404 KHEP-CI-2404 Floor Cluster 52, B2 NA Division 03 1-Nov-2017 2-Nov-2017 11:00 AM 4-Nov-2017 A Approved Closed
Cluster 52, B2
Cast in place concrete Reinforcement and embedded items
2405 KHEP-CI-2405 inspection for RC Column Ground Floor Cluster 73, B2 NA Division 03 1-Nov-2017 2-Nov-2017 11:00 AM 4-Nov-2017 A Approved Closed
Cluster 73, B2

Second coat dam proofing Application inspection for CMU, Morter


Cluster 65,
2406 KHEP-CI-2406 and Masonry inspection under exterior reinforced grade beam
A6
NA Division 07 02-11-20017 4-Nov-2017 9:30 AM 4-Nov-2017 A Approved Closed
Cluster 65, A6

First Coat, Damproofing installation inspection For RC Footing &


Cluster 78,
2407 KHEP-CI-2407 Column Neck Cluster
BC4
NA Division 07 02-11-20017 4-Nov-2017 9:30 AM 4-Nov-2017 A Approved Closed
78, BC4
Compaction test of Sand bedding under pipe trench Sewer Maine
Approved w/
2408 KHEP-CI-2408 Line Dia 200mm Zone Zone 4B Line 1 Division 31 02-11-20017 4-Nov-2017 11:00 AM 5-Nov-2017 B comments
Closed
4B, Line 1, MH-22-L01 to MH-21-L01
Back filling general fill final layer for pipe trench, Storm main line Dia
200mm Zone 2B,
Approved w/
2409 KHEP-CI-2409 Line 2, MH-14-L02 to MH-13-L02 and MH-13-L02 to MH-12-L02 and Line 2 Zone 2B Division 31 02-11-20017 4-Nov-2017 10:00 AM 4-Nov-2017 B comments
Closed
MH-12-L02 to MH-11-L02 and MH-11-L02 to MH-10-L02 and MH-10-
L02 to MH-9-L02

Cast in place concrete form work inspection for RC Column Neck Cluster 67,
2410 KHEP-CI-2410
Cluster 67, A4 A4
NA Division 03 02-11-20017 4-Nov-2017 9:30 AM 4-Nov-2017 A Approved Closed

Installation for Sewer GRP Manholes Sewer main line


Zone 1B, Line 3 & 33 & 34, MH-4-L03 to Line 3 & 33 &
2411 KHEP-CI-2411
MH-03-L07 and MH-1A-L33 to MH-1A-L34 and MH-1-L34 to MH-2- 34
Zone 1B Division 31 02-11-20017 4-Nov-2017 1:30 PM 5-Nov-2017 A Approved Closed
L34
Inspection Form work and concrete Pouring for Sewer embedded
piece at Manholes Line 4 & 5 &
2412 KHEP-CI-2412
Zone 1B, Line 4 & 5 & 6 & 7 & 8, MH-1-L08 to MH-2-L08 and 6&7&8
Zone 1B Division 31 02-11-20017 4-Nov-2017 11:30 AM 5-Nov-2017 A Approved Closed
MH-3-L08 and MH-1-L07 and MH-1-L06 and MH-2-L04 and MH-2-L05

First Coat, Bituminous Damproofing installation inspection for sewer


manholes base Zone 1B,
Line 3 & 31 &
2413 KHEP-CI-2413 Line 3 & 31 & 33 & 34, MH-1-L34, MH-1A-L34 and MH-2-L34 and
33 & 34
Zone 1B Division 31 02-11-20017 4-Nov-2017 11:30 AM 5-Nov-2017 A Approved Closed
MH-1A-L33 and MH-2-L03 and MH-3-L03 and MH-1A-L31, MH-1-L31
and MH-2-L31 and MH-3-L31

Second coat dam proofing installation inspection for CMU, Morter and
Cluster 46,
2414 KHEP-CI-2414 Masonry inspection under exterior reinforced grade beam
A6
NA Division 07 02-11-20017 4-Nov-2017 10:00 AM 4-Nov-2017 A Approved Closed
Cluster 46, A6

Second coat dam proofing installation inspection for CMU, Morter and
Cluster 24, Approved w/
2415 KHEP-CI-2415 Masonry inspection under exterior reinforced grade beam
BC4
NA Division 07 02-11-20017 4-Nov-2017 10:00 AM 4-Nov-2017 B comments
Closed
Cluster 24, BC4
70cm, CMU motor and masonry inspection under exterior reinforced Cluster 30,
2416 KHEP-CI-2416
grade beam Cluster 30, B2 B2
NA Division 04 02-11-20017 4-Nov-2017 2:00 PM 6-Nov-2017 A Approved Closed

Cast in place concrete form work inspection for RC Footing Cluster 49,
2417 KHEP-CI-2417
Cluster 49, BC6 BC6
NA Division 03 02-11-20017 4-Nov-2017 10:00 AM 4-Nov-2017 A Approved Closed

Installation of reinforced steel bar, embedded item & form closure Cluster 49,
2418 KHEP-CI-2418
inspection for RC Footing Cluster 49, BC6 BC6
NA Division 03 02-11-20017 4-Nov-2017 10:00 AM 4-Nov-2017 A Approved Closed

Concrete sampling, testing and placement inspection for Rc Footing Cluster 39,
2419 KHEP-CI-2419
Cluster 39, BC6 BC6
NA Division 03 4-Nov-2017 5-Nov-2017 9:00 AM 6-Nov-2017 A Approved Closed

Concrete sampling, testing and placement inspection for Rc Column


Cluster 9,
2420 KHEP-CI-2420 (Ground Floor)
BC4
NA Division 03 4-Nov-2017 5-Nov-2017 9:00 AM 6-Nov-2017 A Approved Closed
Cluster 9, BC4
Second Coat, Damproofing installation inspection For RC Footing &
Cluster 78,
2421 KHEP-CI-2421 Column Neck Cluster
BC4
NA Division 03 4-Nov-2017 5-Nov-2017 9:30 AM 5-Nov-2017 A Approved Closed
78, BC4
Surface Preparation prior to Damproofing installation inspection For
2422 KHEP-CI-2422 RC Footing & Column Neck luster 79, BC4 NA Division 03 4-Nov-2017 5-Nov-2017 9:30 AM 5-Nov-2017 A Approved Closed
Cluster 79, BC4
Sampling - Aggregate sub base course (saad areemat.EST) JobsiteStock Approved w/
2423 KHEP-CI-2423
JobsiteStock file 18 file 18
NA Division 31 4-Nov-2017 5-Nov-2017 10:30 AM 5-Nov-2017 B comments
Closed

Sampling - Aggregate sub base course (saad areemat.EST) JobsiteStock


2423.1 KHEP-CI-2423-01
JobsiteStock file 18 file 18
NA Division 31 30-Dec-2017 31-Dec-2017 10:30 AM 1-Jan-2018 A Approved Closed

Compaction test for backfilling of pre final layer under slab grade axis
2424 KHEP-CI-2424
(A-C) Cluster 15, B2
Cluster 15 B2 NA Division 03 5-Nov-2017 6-Nov-2017 10:00 AM 7-Nov-2017 A Approved Closed

Cast in place concrete form work inspection for First Floor Slab and
2425 KHEP-CI-2425 beam Cluster 75, B2 NA Division 03 5-Nov-2017 6-Nov-2017 10:30 AM 8-Nov-2017 A Approved Closed
Cluster 75, B2
Cast in place concrete Reinforcement and Embedded items
Approved w/
2426 KHEP-CI-2426 inspection for First Floor Slab and beam Cluster 75, B2 NA Division 03 5-Nov-2017 6-Nov-2017 10:30 AM 8-Nov-2017 B comments
Closed
Cluster 75, B2
Concrete sampling, testing and placement inspection for Rc Column
Cluster 74,
2427 KHEP-CI-2427 Neck Cluster
BC4
NA Division 03 5-Nov-2017 6-Nov-2017 10:30 AM 7-Nov-2017 A Approved Closed
74, BC4

Cast in place concrete form work inspection for RC Grade Beam


2428 KHEP-CI-2428
Cluster 63, B2
Cluster 63, B2 NA Division 03 5-Nov-2017 6-Nov-2017 10:30 AM 7-Nov-2017 A Approved Closed

Installation of reinforced steel bar, embedded item & form closure


2429 KHEP-CI-2429 inspection for RC Grade Beam Cluster 63, B2 NA Division 03 5-Nov-2017 6-Nov-2017 10:30 AM 7-Nov-2017 A Approved Closed
Cluster 63, B2
Compaction test excavated formation level bottom of foundation
Cluster 32,
2430 KHEP-CI-2430 Zone 2B,
BC6
Zone 2B Division 31 5-Nov-2017 6-Nov-2017 1:30 PM 8-Nov-2017 A Approved Closed
Cluster 32, BC6
First coat dam proofing installation inspection for CMU, Morter and
Cluster 23,
2431 KHEP-CI-2431 Masonry inspection under exterior reinforced grade beam
BC4
NA Division 07 5-Nov-2017 6-Nov-2017 10:00 AM 7-Nov-2017 A Approved Closed
Cluster 23, BC4
Inspection of excavated and Compaction formation for pipe trench
Approved w/
2432 KHEP-CI-2432 Sewer main Line Dia 200mm Line 2 Zone 1B Division 31 5-Nov-2017 6-Nov-2017 11:00 AM 8-Nov-2017 B comments
Closed
Zone 1B, Line 2, MH-9-L02
Inspection of excavated and Compaction formation for Sewer
2433 KHEP-CI-2433 Manhole Sewer main Line Zone Line 2 Zone 1B Division 31 5-Nov-2017 6-Nov-2017 1:30 PM 8-Nov-2017 A Approved Closed
1B, Line 2, MH-9-L02 to MH-8-L02
Cast in place concrete form work inspection for RC Column Ground
2434 KHEP-CI-2434 Floor Cluster 73, B2 NA Division 03 5-Nov-2017 6-Nov-2017 10:30 AM 7-Nov-2017 A Approved Closed
Cluster 73, B2
Cast in place concrete form work inspection for RC Stair First Flight
2435 KHEP-CI-2435 Cluster 51, Cluster 51, B2 NA Division 03 5-Nov-2017 6-Nov-2017 10:30 AM 7-Nov-2017 A Approved Closed
B2
Installation of reinforced steel bar, embedded item & form closure
2436 KHEP-CI-2436 inspection for RC Stair First Flight Cluster 51, B2 NA Division 03 5-Nov-2017 6-Nov-2017 10:30 AM 7-Nov-2017 A Approved Closed
Cluster 51, B2
First Coat, Damproofing installation on masonry walls under grade
Cluster 50,
2437 KHEP-CI-2437 beams Cluster 50,
BC4
NA Division 03 5-Nov-2017 6-Nov-2017 10:30 AM 7-Nov-2017 A Approved Closed
BC4
First Coat, Damproofing installation on masonry walls under grade
Cluster 60,
2438 KHEP-CI-2438 beams Cluster 60,
BC4
NA Division 03 5-Nov-2017 6-Nov-2017 10:30 AM 7-Nov-2017 A Approved Closed
BC4
Inspection Form work and concrete Pouring for Sewer embedded
piece at Manholes
Line 8 & 31 &
2439 KHEP-CI-2439 Zone 1B, Line 8 & 31 & 32 & 33 & 34, MH-4-L08 to MH-2-L34
32 & 33 & 34
Zone 1B Division 31 5-Nov-2017 6-Nov-2017 2:30 PM 8-Nov-2017 E Rejected Closed
and MH-1A-L34 and MH-1-L32 and MH-1-L33 and MH-1A-L33 and
MH-3-L31 and MH-2-L31 and MH-1-L31 and MH-1A-L31
Inspection Form work and concrete Pouring for Sewer embedded
piece at Manholes
Line 8 & 31 &
2439.1 KHEP-CI-2439-01 Zone 1B, Line 8 & 31 & 32 & 33 & 34, MH-4-L08 to MH-2-L34
32 & 33 & 34
Zone 1B Division 31 11-Nov-2017 12-Nov-2017 2:30 PM 14-Nov-2017 A Approved Closed
and MH-1A-L34 and MH-1-L32 and MH-1-L33 and MH-1A-L33 and
MH-3-L31 and MH-2-L31 and MH-1-L31 and MH-1A-L31

Inspection of reinforcemend steel bar and internal shutter for storm


Manholes (Precast yard) Zone 2B & Line 1 & 7 & Zone 2B & 3B
2440 KHEP-CI-2440
3B & 4B, Line 1 & 7 & 27, MH-111-L27 and MH-2-L01 and MH-3-L01 27 & 4B
Division 33 6-Nov-2017 7-Nov-2017 11:30 AM 9-Nov-2017 A Approved Closed
and MH-16-L07 and MH-17-L01 and MH-18-L07

Inspection of Dam proofing Surface preparation for storm Manholes


(Precast yard) Zone 1B & 3B & Line 7 & 1 & Zone 1B & 3B
2441 KHEP-CI-2441
4B, Line 7 & 1 & 22 & 24 & 26, MH-29A-L07 and MH-6-L01 and MH- 22 & 24 & 26 & 4B
Division 33 6-Nov-2017 7-Nov-2017 11:30 AM 8-Nov-2017 A Approved Closed
71-L20 and MH-91A-L22 and MH-93-L24 and MH-96-L26

Termite control surface preparation, installation and final inspection


Cluster 38,
2442 KHEP-CI-2442 for Footing Cluster
BC6
NA Division 03 6-Nov-2017 7-Nov-2017 10:00 AM 7-Nov-2017 A Approved Closed
38, BC6
Concrete sampling, testing and placement inspection for Rc Roof
Approved w/
2443 KHEP-CI-2443 Slab Cluster 5, Cluster 5, B2 NA Division 03 6-Nov-2017 7-Nov-2017 9:00 AM 8-Nov-2017 B comments
Closed
B2
Second Coat, Damproofing installation on masonry walls under grade
Cluster 50,
2444 KHEP-CI-2444 beams Cluster 50,
BC4
NA Division 03 6-Nov-2017 7-Nov-2017 10:30 AM 8-Nov-2017 A Approved Closed
BC4
Second Coat, Damproofing installation on masonry walls under grade
Cluster 60,
2445 KHEP-CI-2445 beams Cluster 60,
BC4
NA Division 03 6-Nov-2017 7-Nov-2017 10:30 AM 8-Nov-2017 A Approved Closed
BC4
Installation of reinforced steel bar, embedded item & form closure
2446 KHEP-CI-2446 inspection for RC Roof Slab Cluster 7, B2 NA Division 03 6-Nov-2017 7-Nov-2017 10:00 AM 9-Nov-2017 A Approved Closed
Cluster 7, B2
Installation of reinforced steel bar, embedded item & form closure
Approved w/
2447 KHEP-CI-2447 inspection for RC Stair First Flight and Second Flight Cluster 75, B2 NA Division 03 6-Nov-2017 7-Nov-2017 10:30 AM 9-Nov-2017 B comments
Closed
Cluster 75, B2

Concrete sampling, testing and placement inspection for Rc Footing Cluster 47, Approved w/
2448 KHEP-CI-2448
Cluster 47, BC6 BC6
NA Division 03 6-Nov-2017 7-Nov-2017 10:30 AM 8-Nov-2017 B comments
Closed

Concrete sampling, testing and placement inspection for Rc Column


Approved w/
2449 KHEP-CI-2449 Ground Floor Cluster 52, B2 NA Division 03 6-Nov-2017 7-Nov-2017 10:30 AM 8-Nov-2017 B comments
Closed
Cluster 52, B2
Inspection of excavated and Compaction formation for pipe trench
2450 KHEP-CI-2450 Sewer main Line Dia 200mm Line 2 Zone 1B Division 31 6-Nov-2017 7-Nov-2017 11:00 AM 8-Nov-2017 A Approved Closed
Zone 1B, Line 2, MH-8-L02 to MH-7-L02
Compaction test of Sand bedding under pipe trench Sewer Maine
Line Dia 500mm Zone
Approved w/
2451 KHEP-CI-2451 1B, Line 15, MH-47-L15 to MH-48-L15 and MH-48-L15 to MH-49-L15 Line 15 Zone 1B Division 31 6-Nov-2017 7-Nov-2017 11:00 AM 8-Nov-2017 B comments
Closed
and MH-49-L15 to MH-50-L15 and MH-50-L15 to MH-51-L15 and
MH-51-L15 to MH-52-L15
Compaction test Around Footing general fill (Final layer) Cluster 65,
2452 KHEP-CI-2452
Zone 4A, Cluster 65, A6 A6
Zone 4A Division 31 6-Nov-2017 7-Nov-2017 10:30 AM 8-Nov-2017 A Approved Closed

Sampling - Marl materials From Supplier (Hamida Hamad Al-Salmi JobsiteStock


2453 KHEP-CI-2453 NA Division 31 6-Nov-2017 7-Nov-2017 10:30 AM RECALLED
Est) JobsiteStock file 19 file 19

Second coat dam proofing installation inspection for CMU, Morter and
Cluster 23,
2454 KHEP-CI-2454 Masonry inspection under exterior reinforced grade beam
BC4
NA Division 07 6-Nov-2017 7-Nov-2017 10:00 AM 8-Nov-2017 A Approved Closed
Cluster 23, BC4

Cast in place concrete form work inspection for RC Roof Slab


2455 KHEP-CI-2455
Cluster 7, B2
Cluster 7, B2 NA Division 03 6-Nov-2017 7-Nov-2017 10:00 AM 9-Nov-2017 A Approved Closed
Blinding Concrete sampling, testing and placement inspection for Rc
Cluster 38,
2456 KHEP-CI-2456 Footing
BC6
NA Division 03 7-Nov-2017 8-Nov-2017 9:00 AM 9-Nov-2017 A Approved Closed
Cluster 38, BC6
Installation of reinforced steel bar, embedded item & form closure
Cluster 39,
2457 KHEP-CI-2457 inspection for RC Column neck
BC6
NA Division 03 7-Nov-2017 8-Nov-2017 10:00 AM 9-Nov-2017 A Approved Closed
Cluster 39, BC6
70cm, CMU motor and masonry inspection under exterior reinforced
Cluster 22,
2458 KHEP-CI-2458 grade beam Cluster 22,
BC4
NA Division 04 7-Nov-2017 8-Nov-2017 2:00 PM 11-Nov-2017 A Approved Closed
BC4

Cast in place concrete form work inspection for RC First Floor Slab Approved w/
2459 KHEP-CI-2459
Cluster 8, B2
Cluster 8, B2 NA Division 03 7-Nov-2017 8-Nov-2017 10:00 AM 11-Nov-2017 B comments
Closed

Installation of reinforced steel bar, embedded item & form closure


2460 KHEP-CI-2460 inspection for RC First Floor Slab Stair Second Flight Cluster 8, B2 NA Division 03 7-Nov-2017 8-Nov-2017 10:00 AM 11-Nov-2017 A Approved Closed
Cluster 8, B2
Check the survey work, elevation and coordinate for billnding under
Grade Beam Cluster 21,
2461 KHEP-CI-2461
Cluster 21, BC4 BC4
NA Division 03 7-Nov-2017 8-Nov-2017 2:00 PM 9-Nov-2017 A Approved Closed

Cast in place concrete form work inspection for RC Stair (First Flight
Approved w/
2462 KHEP-CI-2462 & Second Flight) Cluster 75, B2 NA Division 03 7-Nov-2017 8-Nov-2017 9:00 AM 9-Nov-2017 B comments
Closed
Cluster 75, B2

Concrete sampling, testing and placement inspection for Rc Footing Cluster 49, Approved w/
2463 KHEP-CI-2463
Cluster 49, BC6 BC6
NA Division 03 7-Nov-2017 8-Nov-2017 10:30 AM 9-Nov-2017 B comments
Closed

Cast in place concrete form work inspection for RC Column Ground


Approved w/
2464 KHEP-CI-2464 Floor Cluster 54, B2 NA Division 03 7-Nov-2017 8-Nov-2017 10:30 AM 9-Nov-2017 B comments
Closed
Cluster 54, B2
Compaction test Around Footing general fill (6th layer) Cluster 46,
2465 KHEP-CI-2465
Zone 3A, Cluster 46, A6 A6
Zone 3A Division 31 7-Nov-2017 8-Nov-2017 10:30 AM 11-Nov-2017 A Approved Closed

Compaction test of Sand bedding under pipe trench Sewer Maine


2466 KHEP-CI-2466 Line Dia 200mm Zone Line 2 Zone 1B Division 31 7-Nov-2017 8-Nov-2017 11:00 AM 9-Nov-2017 A Approved Closed
1B, Line 2, MH-9-L02 to MH-8-L02
Inspection Form work and concrete Pouring for Sewer embedded
2467 KHEP-CI-2467 piece at Manholes Line 3 & 34 Zone 1B Division 31 7-Nov-2017 8-Nov-2017 2:30 PM 9-Nov-2017 A Approved Closed
Zone 1B, Line 3 & 34, MH-1-L34 to MH-2-L03 and MH-3-L03

Second Coat, Bituminous Damproofing installation inspection for


Line 10 & 16
2468 KHEP-CI-2468 Storm manholes Zone 1B,
& 13
Zone 1B Division 33 7-Nov-2017 8-Nov-2017 3:00 PM 11-Nov-2017 E Rejected Closed
Line 10 & 16 & 13, MH-I31-L10, MH-I53-L16 and MH-I41-L13

Second Coat, Bituminous Damproofing installation inspection for


Line 10 & 16
2468.1 KHEP-CI-2468-01 Storm manholes Zone 1B,
& 13
Zone 1B Division 33 18-Nov-2017 19-Nov-2017 3:00 PM 22-Nov-2017 A Approved Closed
Line 10 & 16 & 13, MH-I31-L10, MH-I53-L16 and MH-I41-L13

Inspection Form work for base & wall and concrete Pouring for Storm
Manholes (Precast yard) Line 1 & 7 & Zone 2B, 3B &
2469 KHEP-CI-2469
Zone 2B, 3B & 4B, Line 1 & 7 & 27, MH-111-L27 to MH-2- 27 4B
Division 33 7-Nov-2017 8-Nov-2017 11:30 AM 9-Nov-2017 A Approved Closed
L01 and MH-3-L01 and MH-16-L01 and MH-17-L07 and MH-18-L07
Concrete sampling, testing and placement inspection for Rc Stair
Approved w/
2470 KHEP-CI-2470 First Flight Cluster 51, B2 NA Division 03 7-Nov-2017 8-Nov-2017 10:30 AM 9-Nov-2017 B comments
Closed
Cluster 51, B2
First coat dam proofing installation inspection for CMU, Morter and
Cluster 18
2471 KHEP-CI-2471 Masonry inspection under exterior reinforced grade beam
BC4
NA Division 07 7-Nov-2017 8-Nov-2017 3:00 PM 9-Nov-2017 A Approved Closed
Cluster 18, BC4
Cast in place concrete form work inspection for RC Footing Cluster 70,
2472 KHEP-CI-2472
Cluster 70, BC4 BC4
NA Division 03 8-Nov-2017 9-Nov-2017 10:00 AM 11-Nov-2017 A Approved Closed

Installation of reinforced steel bar, embedded item & form closure


Cluster 70,
2473 KHEP-CI-2473 inspection for RC Footing
BC4
NA Division 03 8-Nov-2017 9-Nov-2017 10:10 AM 11-Nov-2017 A Approved Closed
Cluster 70, BC4
Concrete sampling, testing and placement inspection for Rc Grade
Approved w/
2474 KHEP-CI-2474 Beam Cluster Cluster 63, B2 NA Division 03 8-Nov-2017 9-Nov-2017 10:30 AM 14-Nov-2017 B comments
Closed
63, B2
Concrete sampling, testing and placement inspection for Rc Column
Cluster 67, Approved w/
2475 KHEP-CI-2475 Neck Cluster 67,
A4
NA Division 03 8-Nov-2017 9-Nov-2017 10:45 AM 11-Nov-2017 B comments
Closed
A4
Compaction test of Sand bedding under pipe trench Sewer Maine
Approved w/
2476 KHEP-CI-2476 Line Dia 200mm Zone Line 2 Zone 1B Division 31 8-Nov-2017 9-Nov-2017 11:00 AM 9-Nov-2017 B comments
Closed
1B, Line 2, MH-8-L02 to MH-7-L02
Building concrete sampling, testing and placement inspection for
2477 KHEP-CI-2477 manholes, Sewer main line Line 2 Zone 1B Division 31 8-Nov-2017 9-Nov-2017 1:30 PM 11-Nov-2017 A Approved Closed
Zone 1B, Line 2, MH-9-L02
First Coat, Bituminous Damproofing installation inspection for Storm
manholes Precast yard
Line 7 & 1 & Zone 1B & 3B
2478 KHEP-CI-2478 Zone 1B & 3B & 4B, Line 7 & 1 & 22 & 24 & 26, MH-29A-L07, MH-6-
22 & 24 & 26 & 4B
Division 33 8-Nov-2017 9-Nov-2017 11:30 AM 11-Nov-2017 A Approved Closed
L01 and MH-71-L20 and MH-91A-L22 and MH-93-L24 and MH-96-
L26
Inspection of Gravel Bedding Installation Under S.Sewer Manholes
base with geotextile Protection Sheet Sewer main line Approved w/
2479 KHEP-CI-2479
Zone 1B, Line2, MH-7-
Line2 Zone 1B Division 31 8-Nov-2017 9-Nov-2017 1:30 PM 11-Nov-2017 B comments
Closed
L02, MH-8-L02
Cast in place concrete form work inspection for RC Column Ground
2480 KHEP-CI-2480 Floor Cluster 27, B2 NA Division 03 8-Nov-2017 9-Nov-2017 10:00 AM 11-Nov-2017 A Approved Closed
Cluster 27, B2
First Coat, Bituminous Damproofing installation inspection for Sewer
2481 KHEP-CI-2481 manholes base Zone 1B, Line 2 Zone 1B Division 31 8-Nov-2017 9-Nov-2017 11:30 AM 11-Nov-2017 E Rejected Closed
Line 2, MH-9-L02, MH-8-L02 and MH-7-L02
First Coat, Bituminous Damproofing installation inspection for Sewer
2481.1 KHEP-CI-2481-01 manholes base Zone 1B, Line 2 Zone 1B Division 31 11-Nov-2017 12-Nov-2017 11:30 AM 13-Nov-2017 A Approved Closed
Line 2, MH-9-L02, MH-8-L02 and MH-7-L02
Building concrete sampling, testing and placement inspection for
2482 KHEP-CI-2482 manholes, Storm main line Line 7 Zone 1B Division 31 8-Nov-2017 9-Nov-2017 1:30 PM 11-Nov-2017 A Approved Closed
Zone 1B, Line 7, MH-20-L07

Cast in place concrete formwork inspection for Rc First Floor Slab &
2483 KHEP-CI-2483
Stair (Second Flight) Cluster 61, B2
Cluster 61, B2 NA Division 03 9-Nov-2017 11-Nov-2017 2:00 PM 13-Nov-2017 A Approved Closed

Installation of reinforced steel bar, embedded item & form closure


Approved w/
2484 KHEP-CI-2484 inspection for RC First Floor Slab & Stair (Second Flight) Cluster 61, B2 NA Division 03 9-Nov-2017 11-Nov-2017 2:30 PM 13-Nov-2017 B comments
Closed
Cluster 61, B2

Concrete sampling, testing and placement inspection for First Floor &
2485 KHEP-CI-2485
Stair (First & Second Flight) Cluster 75, B2
Cluster 75, B2 NA Division 03 9-Nov-2017 11-Nov-2017 9:30 AM 13-Nov-2017 A Approved Closed

Concrete sampling, testing and placement inspection for Rc Column


2486 KHEP-CI-2486
Ground Floor Cluster 54, B2
Cluster 54, B2 NA Division 03 9-Nov-2017 11-Nov-2017 10:00 AM 13-Nov-2017 A Approved Closed

Inspection of Reinforcement steel bar, Form work for base for Sewer
GRP Manholes (Precast yard) Zone 2B, Line 9
& 10 & 11 & 12 & 27, MH-5-L27 to MH-4-L27 and MH-3-L09 and Line 9 & 10 &
2487 KHEP-CI-2487
MH-2-L09 and MH-1-L09 and MH-1A-L09 and MH-1-L10 and MH-1A- 11 & 12 & 27
Zone 2B Division 33 9-Nov-2017 11-Nov-2017 10:00 AM 11-Nov-2017 A Approved Closed
L10 and MH-1-L11 and MH-1A-L11 and MH-3-L12 and MH-2-L12 and
MH-1-L12

Cast in place concrete formwork inspection for Rc grade beam


2488 KHEP-CI-2488
Cluster 33, B2
Cluster 33, B2 NA Division 03 9-Nov-2017 11-Nov-2017 2:00 PM 13-Nov-2017 A Approved Closed

Installation of reinforced steel bar, embedded item & form closure


2489 KHEP-CI-2489
inspection for RC grade beam Cluster 33, B2
Cluster 33, B2 NA Division 03 9-Nov-2017 11-Nov-2017 2:00 PM 12-Nov-2017 A Approved Closed

Cast in place concrete formwork inspection for Rc Stair First Flight


2490 KHEP-CI-2490
Cluster 19, B2
Cluster 19 B2 NA Division 03 9-Nov-2017 11-Nov-2017 10:00 AM 12-Nov-2017 A Approved Closed

Installation of reinforced steel bar, embedded item & form closure


2491 KHEP-CI-2491
inspection for RC Stair First Flight Cluster 19, B2
Cluster 19 B2 NA Division 03 9-Nov-2017 11-Nov-2017 10:00 AM 12-Nov-2017 A Approved Closed

Second coat dam proofing installation inspection for CMU, Morter and
Cluster 18
2492 KHEP-CI-2492 Masonry inspection under exterior reinforced grade beam
BC4
NA Division 07 9-Nov-2017 11-Nov-2017 10:00 AM 11-Nov-2017 A Approved Closed
Cluster 18, BC4

First coat dam proofing installation inspection for CMU, Morter and
2493 KHEP-CI-2493 Masonry inspection under exterior reinforced grade beam Cluster 30, Cluster 30, B2 NA Division 07 9-Nov-2017 11-Nov-2017 2:00 PM 15-Nov-2017 A Approved Closed
B2
Back filling general fill final layer for pipe trench, Sewer main line Dia
200mm Zone 3B,
Approved w/
2494 KHEP-CI-2494 Line 13 & 14, MH-2-L14 to MH-1-L14 and MH-1-L14 to MH-1A-L14 Line 13 & 14 Zone 3B Division 31 9-Nov-2017 11-Nov-2017 10:00 AM 11-Nov-2017 B comments
Closed
and MH-1A-L14 to MH-1-L13 and MH-2-L13 to MH-1-L13 and MH-1-
L13 to MH-1A-L13 and MH-1A-L13 to MH-14-L01

Back filling general fill final layer for pipe trench, Sewer main line Dia
2495 KHEP-CI-2495 200mm Zone 3B, Line 1 Zone 3B Division 31 9-Nov-2017 11-Nov-2017 10:00 AM 11-Nov-2017 A Approved Closed
Line 1, MH-15-L01 to MH-14-L01
Back filling general fill final layer for pipe trench, Sewer main line Dia
200mm Zone 5C, Approved w/
2496 KHEP-CI-2496
Line 34, MH-128-L34 to MH-129-L34 and MH-129-L34 to MH-130-
Line 34 Zone 5C Division 31 9-Nov-2017 11-Nov-2017 10:00 AM 11-Nov-2017 B comments
Closed
L34 and MH-130-L34 to MH-131-L34
Installation of reinforced steel bar, embedded item & form closure
2497 KHEP-CI-2497 inspection for RC Column (First Floor) Cluster 8, Cluster 8, B2 NA Division 03 11-Nov-2017 12-Nov-2017 2:00 PM 13-Nov-2017 A Approved Closed
B2
Damproofing surface preparation for RC Footing & Column Neck
Cluster 40,
2498 KHEP-CI-2498 Cluster 40,
BC4
NA Division 07 11-Nov-2017 12-Nov-2017 2:00 PM 13-Nov-2017 A Approved Closed
BC4
Installation of reinforced steel bar, embedded item & form closure
2499 KHEP-CI-2499 inspection for RC Column (Ground Floor) Cluster Cluster 35, B2 NA Division 03 11-Nov-2017 12-Nov-2017 10:00 AM 13-Nov-2017 A Approved Closed
35, B2
Cast in place concrete formwork inspection for Column Neck Cluster 39,
2500 KHEP-CI-2500
Cluster 39, BC6 BC6
NA Division 03 11-Nov-2017 12-Nov-2017 10:00 AM 13-Nov-2017 A Approved Closed

Cast in place concrete formwork inspection for Rc Stair First Flight


2501 KHEP-CI-2501
Cluster 20, B2
Cluster 20 B2 NA Division 03 11-Nov-2017 12-Nov-2017 2:00 PM 13-Nov-2017 A Approved Closed

Installation of reinforced steel bar, embedded item & form closure


2502 KHEP-CI-2502
inspection for RC Stair First Flight Cluster 20, B2
Cluster 20 B2 NA Division 03 11-Nov-2017 12-Nov-2017 2:00 PM 13-Nov-2017 A Approved Closed

Concrete sampling, testing and placement inspection for Rc Roof


2503 KHEP-CI-2503
Slab Cluster 7, B1
Cluster 7, B2 NA Division 03 11-Nov-2017 12-Nov-2017 9:00 AM 13-Nov-2017 A Approved Closed

Concrete sampling, testing and placement inspection for Rc First


2504 KHEP-CI-2504 Floor Slab Cluster 8, Cluster 8, B2 NA Division 03 11-Nov-2017 12-Nov-2017 9:00 AM 13-Nov-2017 A Approved Closed
B2
Check the survey work, elevation and coordinate for billnding under
Grade Beam Cluster 65,
2505 KHEP-CI-2505
Cluster 65, A6 A6
NA Division 03 11-Nov-2017 12-Nov-2017 9:30 AM 13-Nov-2017 A Approved Closed

Cast in place concrete formwork inspection for Rc Stair First Flight


2506 KHEP-CI-2506
Cluster 71, B2
Cluster 71, B2 NA Division 03 11-Nov-2017 12-Nov-2017 1:30 PM 13-Nov-2017 A Approved Closed

Installation of reinforced steel bar, embedded item & form closure


2507 KHEP-CI-2507
inspection for RC Stair First Flight Cluster 71, B2
Cluster 71, B2 NA Division 03 11-Nov-2017 12-Nov-2017 10:30 AM 13-Nov-2017 A Approved Closed

Compaction Test Excavated Formation level bottom of Foundation BC6


Cluster 62,
2508 KHEP-CI-2508
Zone 3B, Cluster 62, BC6 BC6
Division 31 11-Nov-2017 12-Nov-2017 1:30 PM 13-Nov-2017 A Approved Closed
Compaction Test First &Final layer Structural Fill (Selected Fill)
Cluster 32,
2509 KHEP-CI-2509
Zone 2B, Cluster 32, BC6 BC6
Zone 2B Division 31 11-Nov-2017 12-Nov-2017 2:30 PM 13-Nov-2017 A Approved Closed

Inspection of excavated and Compaction formation for Sewer


Manholes Sewer main Line Zone
2510 KHEP-CI-2510
2B, Line 11 & 12, MH-1-L11 to MH-1A-L11 and MH-1-L12 to MH-2-
Line 11 & 12 Zone 2B Division 31 11-Nov-2017 12-Nov-2017 11:30 AM 13-Nov-2017 A Approved Closed
L12 and MH-3-L12
Concrete sampling, testing and placement inspection for Rc Column
Approved w/
2511 KHEP-CI-2511 Ground Floor Cluster Cluster 27, B2 NA Division 03 12-Nov-2017 13-Nov-2017 9:00 AM 14-Nov-2017 B comments
Closed
27, B2
Concrete sampling, testing and placement inspection for Rc Stair
Approved w/
2512 KHEP-CI-2512 First Flight Cluster 19, Cluster 19 B2 NA Division 03 12-Nov-2017 13-Nov-2017 9:00 AM 14-Nov-2017 B comments
Closed
B2

Second coat dam proofing installation inspection for CMU, Morter and
2513 KHEP-CI-2513 Masonry inspection under exterior reinforced grade beam Cluster 30, B2 NA Division 07 12-Nov-2017 13-Nov-2017 10:00 AM 13-Nov-2017 A Approved Closed
Cluster 30, B2

First coat dam proofing installation inspection for CMU, Morter and
Cluster 22,
2514 KHEP-CI-2514 Masonry inspection under exterior reinforced grade beam
BC4
NA Division 07 12-Nov-2017 13-Nov-2017 2:00 PM 15-Nov-2017 A Approved Closed
Cluster 22, BC4
Compaction test (First Layer) for Back Filling of pre final layer under
Approved w/
2515 KHEP-CI-2515 slab on Grade axis (A-J) Cluster 01 A6 NA Division 03 12-Nov-2017 13-Nov-2017 2:00 PM 13-Nov-2017 B comments
Closed
Cluster 1, A6
First Coat, Damproofing installation Inspection for RC Footing &
Cluster 41,
2516 KHEP-CI-2516 Column Neck
BC4
NA Division 07 12-Nov-2017 13-Nov-2017 10:00 AM 14-Nov-2017 A Approved Closed
Cluster 41, BC4
70cm, CMU motor and masonry inspection under exterior reinforced
Cluster 55,
2517 KHEP-CI-2517 grade beam Cluster 55,
BC4
NA Division 04 12-Nov-2017 13-Nov-2017 10:30 AM 13-Nov-2017 A Approved Closed
BC4

Cast in place concrete formwork inspection for Rc Stair First Flight


2518 KHEP-CI-2518
Cluster 52, B2
Cluster 52, B2 NA Division 03 12-Nov-2017 13-Nov-2017 9:30 AM 14-Nov-2017 A Approved Closed

Installation of reinforced steel bar, embedded item & form closure


2519 KHEP-CI-2519
inspection for RC Stair First Flight Cluster 52, B2
Cluster 52, B2 NA Division 03 12-Nov-2017 13-Nov-2017 10:00 AM 14-Nov-2017 A Approved Closed

First Coat, Damproofing installation Inspection for RC Footing &


Cluster 77,
2520 KHEP-CI-2520 Column Neck
BC4
NA Division 03 12-Nov-2017 13-Nov-2017 9:15 AM 14-Nov-2017 A Approved Closed
Cluster 77, BC4

Concrete sampling, testing and placement inspection for Rc Footing Cluster 70,
2521 KHEP-CI-2521
Cluster 70, BC4 BC4
NA Division 03 12-Nov-2017 13-Nov-2017 9:00 AM 14-Nov-2017 A Approved Closed

Inspection of concrete pouring for Sewer GRP Manholes (Precast


yard) Zone 2B, Line
9 & 10 & 11 & 12 & 27, MH-5-L27 to MH-4-L27 and MH-3-L27 to Line 9 & 10 & Approved w/
2522 KHEP-CI-2522
MH-3-L09 and MH-2-L09 and MH-1-L09 and MH-1A-L09 and MH-1- 11 & 12 & 27
Zone 2B Division 33 12-Nov-2017 13-Nov-2017 10:00 AM 14-Nov-2017 B comments
Closed
L10 and MH-1A-L10 and MH-1-L11 and MH-1A-L11 and MH-3-L12
and MH-2-L12 to MH-1-L12
Inspection of excavated and Compaction formation for Sewer
Manholes Sewer main Line Zone
2523 KHEP-CI-2523
2B, Line 9 & 10, MH-1-L10 and MH-1A-L10 and MH-1-L09 and MH-3-
Line 9 & 10 Zone 2B Division 31 12-Nov-2017 13-Nov-2017 11:30 AM 14-Nov-2017 A Approved Closed
L09
First Coat, Bituminous Damproofing installation inspection for Sewer
2524 KHEP-CI-2524 manholes base Zone 1B, Line 2 Zone 1B Division 31 12-Nov-2017 13-Nov-2017 10:30 AM 14-Nov-2017 A Approved Closed
Line 2, MH-9-L02, MH-8-L02 and MH-7-L02
Compaction test Around Footing general fill (Final layer) Cluster 24, Approved w/
2525 KHEP-CI-2525
Zone 2B, Cluster 24, BC4 BC4
Zone 2B Division 31 12-Nov-2017 13-Nov-2017 10:30 AM 15-Nov-2017 B comments
Closed

Inspection of excavated and Compaction formation for Pipe Trench


Approved w/
2526 KHEP-CI-2526 Sewer main Line Dia 500mm Zone 2B, Line 9 Zone 2B Division 31 12-Nov-2017 13-Nov-2017 11:30 AM 14-Nov-2017 B comments
Closed
Line 9, MH-I25-L09 and MH-26-L08
Inspection of Reinforcement steel bar, Internal Shutter for Storm
Manholes (Precast yard) Zone 1B & 2B Line 1 & 4 &
Zone 1B & 2B Approved w/
2527 KHEP-CI-2527 & 3B & 4B, Line 1 & 4 & 13 & 25 & 30 & 27, MH-111A-L27 and MH- 13 & 25 & 30
& 3B & 4B
Division 33 12-Nov-2017 13-Nov-2017 2:30 PM 14-Nov-2017 B comments
Closed
94-L25 and MH-60-L13 and MH-15-L04 and MH-09-L01 and MH-106- & 27
L30
Installation Inspection of Precast Storm Drainage manholes
Approved w/
2528 KHEP-CI-2528 Zone 2B, Line 9 & 4, MH-I24-L09 and MH-I25-L09 and MH-I10-L04 Line 9 & 4 Zone 2B Division 33 12-Nov-2017 13-Nov-2017 11:00 AM 14-Nov-2017 B comments
Closed
and MH-I13-L04
Termite control surface preparation, installation and final inspection
Cluster 65,
2529 KHEP-CI-2529 for Grade Beam Cluster 65,
A6
NA Division 03 12-Nov-2017 13-Nov-2017 8:30 AM 13-Nov-2017 A Approved Closed
A6
70cm, CMU motor and masonry inspection under exterior reinforced
Cluster 25,
2530 KHEP-CI-2530 grade beam Cluster 25,
BC4
NA Division 04 12-Nov-2017 13-Nov-2017 2:00 PM 13-Nov-2017 A Approved Closed
BC4

Installation of reinforced steel bar, embedded item & form closure Cluster 49,
2531 KHEP-CI-2531
inspection for RC Column Neck Cluster 49, BC6 BC6
NA Division 03 13-Nov-2017 14-Nov-2017 9:00 AM 15-Nov-2017 A Approved Closed

Second Coat, Damproofing installation Inspection for RC Footing &


Cluster 77,
2532 KHEP-CI-2532 Column Neck Cluster 77,
BC4
NA Division 07 13-Nov-2017 14-Nov-2017 10:00 AM 15-Nov-2017 A Approved Closed
BC4

Cast in place concrete formwork inspection for Rc Grade Beam


2533 KHEP-CI-2533
Cluster 72, B2
Cluster 72, B2 NA Division 03 13-Nov-2017 14-Nov-2017 1:30 PM 15-Nov-2017 A Approved Closed

Installation of reinforced steel bar, embedded item & form closure


2534 KHEP-CI-2534
inspection for RC Grade Beam Cluster 72, B2
Cluster 72, B2 NA Division 03 13-Nov-2017 14-Nov-2017 2:00 PM 15-Nov-2017 A Approved Closed
Cast in place concrete formwork inspection for Rc Stair First Flight
2535 KHEP-CI-2535 Cluster 54, Cluster 54, B2 NA Division 03 13-Nov-2017 14-Nov-2017 10:30 AM 15-Nov-2017 A Approved Closed
B2
Installation of reinforced steel bar, embedded item & form closure
2536 KHEP-CI-2536 inspection for RC Stair First Flight Cluster 54, Cluster 54, B2 NA Division 03 13-Nov-2017 14-Nov-2017 10:45 AM 15-Nov-2017 A Approved Closed
B2
Installation of reinforced steel bar, embedded item & form closure
Cluster 47,
2537 KHEP-CI-2537 inspection for RC Column Neck Cluster 47,
BC6
NA Division 03 13-Nov-2017 14-Nov-2017 9:30 AM 15-Nov-2017 A Approved Closed
BC6

Termite control surface preparation, installation and final inspection Cluster 21,
2538 KHEP-CI-2538
for Grade Beam Cluster 21, BC4 BC4
NA Division 03 13-Nov-2017 14-Nov-2017 9:00 AM 14-Nov-2017 A Approved Closed

Blinding Concrete sampling, testing and placement inspection for


Cluster 21,
2539 KHEP-CI-2539 Grade Beam Cluster
BC4
NA Division 03 13-Nov-2017 14-Nov-2017 9:00 AM 14-Nov-2017 A Approved Closed
21, BC4
Concrete sampling, testing and placement inspection for RC Stair
Approved w/
2540 KHEP-CI-2540 (First Flight) Cluster Cluster 20 B2 NA Division 03 13-Nov-2017 14-Nov-2017 9:00 AM 15-Nov-2017 B comments
Closed
20, B2

Concrete sampling, testing and placement inspection for RC Grade


2541 KHEP-CI-2541
Beam Cluster 33, B2
Cluster 33, B2 NA Division 03 13-Nov-2017 14-Nov-2017 9:00 AM 15-Nov-2017 A Approved Closed

Installation Inspection of Precast Storm Drainage manholes Zone


2542 KHEP-CI-2542 1B, Line 15, MH-47-L15 to MH-48-L15 and MH-49-L15 to MH-50-L15 Line 15 Zone 1B Division 33 13-Nov-2017 14-Nov-2017 11:00 AM 15-Nov-2017 A Approved Closed
and MH-51-L15 to MH-52-L15

Inspection of excavated and Compaction formation for Pipe Trench


Approved w/
2543 KHEP-CI-2543 Sewer main Line Dia 200mm Zone 1B, Line 1 Zone 1B Division 31 13-Nov-2017 14-Nov-2017 11:30 AM 15-Nov-2017 B comments
Closed
Line 1, MH-8-L01 and MH-7-L01 and MH-7-L01 and MH-6-L01

Inspection of Sand filling Around pipe main line Dia 200mm Zone Approved w/
2544 KHEP-CI-2544
4B, Line 1, MH-22-L01 to MH-21-L01
Line 1 Zone 4B Division 31 13-Nov-2017 14-Nov-2017 11:00 AM 15-Nov-2017 B comments
Closed

Compaction Test Around Footing General Fill (Final Layer) Zone Cluster 23,
2545 KHEP-CI-2545
1B, Cluster 23, BC4 BC4
Zone 1B Division 31 13-Nov-2017 14-Nov-2017 10:30 AM 15-Nov-2017 A Approved Closed

Damproofing surface preparation for RC Foundation & Column Neck


Cluster 67,
2546 KHEP-CI-2546 Cluster
A4
NA Division 07 13-Nov-2017 14-Nov-2017 9:45 AM 15-Nov-2017 A Approved Closed
67, A4
Installation for Sewer GRP Manholes Sewer main line Zone
2547 KHEP-CI-2547
1B, Line 2, MH-9-L02 and MH-8-L02 and MH-7-L02
Line 2 Zone 1B Division 31 13-Nov-2017 14-Nov-2017 1:30 PM 15-Nov-2017 A Approved Closed

First Coat, Bituminous Damproofing installation inspection for Sewer


manholes base Zone 1B,
Line 3 & 4 & 5 & 6 & 7 & 8, MH-1-L03 and MH-1A-L03 and MH-1- Line 3 & 4 &
2548 KHEP-CI-2548
L04 and MH-2-L04 and MH-1-L05 and MH-2-L05 and MH-1-L06 and 5 & 6 & 7 & 8
Zone 1B Division 31 13-Nov-2017 14-Nov-2017 2:30 PM 15-Nov-2017 A Approved Closed
MH-1-L07 and MH-1-L08 and MH-2-L08 and MH-3-L08 and MH-4-
L08

First Coat, Bituminous Damproofing installation inspection for Sewer


manholes base (Precast yard) Zone 1B,
Line 1 & 2, MH-1-L01 and MH-8-L01 and MH-2-L01 and MH-7-L01
2549 KHEP-CI-2549
and MH-2-L02 and MH-1-L02 and MH-6-L01 and MH-3-L01 and
Line 1 & 2 Zone 1B Division 31 13-Nov-2017 14-Nov-2017 3:00 PM 15-Nov-2017 A Approved Closed
MH-4-L01 and MH-14-L01 and MH-3-L02 and MH-15-L01 and MH-
12-L01 and MH-10-L01 and MH-5-L01 and MH-5A-L02

Inspection of excavated and Compaction formation for Pipe Trench


2550 KHEP-CI-2550 Storm main Line Dia 400mm Zone 2B, Line 1 Zone 2B Division 31 13-Nov-2017 14-Nov-2017 11:30 AM 15-Nov-2017 A Approved Closed
Line 1, MH-1-L01 and MH-2-L01
Inspection of excavated and Compaction formation for Storm
2551 KHEP-CI-2551 Manholes Storm main Line Zone Line 1 Zone 2B Division 31 13-Nov-2017 14-Nov-2017 1:30 PM 15-Nov-2017 A Approved Closed
2B, Line 1, MH-1-L01 and MH-2-L01
Second Coat, Damproofing installation Inspection for RC Footing &
Cluster 41,
2552 KHEP-CI-2552 Column Neck Cluster 41,
BC4
NA Division 07 13-Nov-2017 14-Nov-2017 10:00 AM 15-Nov-2017 A Approved Closed
BC4

Compaction test (First Layer - pre final layer) for Back Filling of under
2553 KHEP-CI-2553 slab on Grade axis (A-C) Villa (1) and axis (J-N), Villa (5 & 6) Cluster 01 A6 NA Division 03 13-Nov-2017 14-Nov-2017 10:00 AM 20-Nov-2017 A Approved Closed
Cluster 1, A6

Installation of reinforced steel bar, embedded item & form closure


2554 KHEP-CI-2554 inspection for RC Column (Ground Floor) Cluster 33, Cluster 33, B2 NA Division 03 13-Nov-2017 14-Nov-2017 2:00 PM 15-Nov-2017 A Approved Closed
B2
Installation of reinforced steel bar, embedded item & form closure
2555 KHEP-CI-2555
inspection for RC Column (First Floor) Cluster 75, B2
Cluster 75, B2 NA Division 03 14-Nov-2017 15-Nov-2017 9:00 AM 16-Nov-2017 A Approved Closed

Blinding concrete sampling, Testing & placement inspection for


Cluster 65,
2556 KHEP-CI-2556 Grade beam
A6
NA Division 03 14-Nov-2017 15-Nov-2017 9:30 AM 15-Nov-2017 A Approved Closed
Cluster 65, A6
First Coat, Damp Proofing Installation Inspection for RC Footing &
Cluster 76,
2557 KHEP-CI-2557 Column neck
BC4
NA Division 03 14-Nov-2017 15-Nov-2017 1:30 PM 15-Nov-2017 A Approved Closed
Cluster 76, BC4
Concrete sampling, testing and placement inspection for slab &
Approved w/
2558 KHEP-CI-2558 beams First Floor Slab Cluster 61, B2 NA Division 03 14-Nov-2017 15-Nov-2017 9:15 AM 16-Nov-2017 B comments
Closed
Cluster 61, B2
Compaction test of Sand bedding under pipe trench Storm Maine
2559 KHEP-CI-2559 Line Dia 500mm Zone Line 9 Zone 2B Division 31 14-Nov-2017 15-Nov-2017 11:00 AM 16-Nov-2017 A Approved Closed
2B, Line 9, MH-I25-L09 to MH-26-L08
Compaction test Around Footing general fill (Final layer)
2560 KHEP-CI-2560
Zone 2B, Cluster 30, B2
Cluster 30, B2 Zone 2B Division 31 14-Nov-2017 15-Nov-2017 10:30 AM 16-Nov-2017 E Rejected Closed

Compaction test Around Footing general fill (Final layer)


2560.1 KHEP-CI-2560-01
Zone 2B, Cluster 30, B2
Cluster 30, B2 Zone 2B Division 31 18-Nov-2017 19-Nov-2017 10:30 AM 20-Nov-2017 A Approved Closed

Building concrete sampling, testing and placement inspection for


2561 KHEP-CI-2561 manholes, Storm main line Line 1 Zone 2B Division 31 14-Nov-2017 15-Nov-2017 1:30 PM 18-Nov-2017 E Rejected Closed
Zone 2B, Line 1, MH-1-L01 and MH-2-L01
Building concrete sampling, testing and placement inspection for
2561.1 KHEP-CI-2561-01 manholes, Storm main line Line 1 Zone 2B Division 31 20-Nov-2017 21-Nov-2017 1:30 PM 22-Nov-2017 A Approved Closed
Zone 2B, Line 1, MH-1-L01 and MH-2-L01
Building concrete sampling, testing and placement inspection for
manholes, Sewer main line
Line 9 & 10 &
2562 KHEP-CI-2562 Zone 2B, Line 9 & 10 & 11 & 12, MH-1-L10 and MH-1A-L10 and MH-
11 & 12
Zone 2B Division 31 14-Nov-2017 15-Nov-2017 11:30 AM 18-Nov-2017 E Rejected Closed
3-L12 and MH-1-L09 and MH-1-L11 and MH-1A-L11 and MH-3-L09
and MH-1-L12 and MH-2-L12
Building concrete sampling, testing and placement inspection for
manholes, Sewer main line
Line 9 & 10 &
2562.1 KHEP-CI-2562-01 Zone 2B, Line 9 & 10 & 11 & 12, MH-1-L10 and MH-1A-L10 and MH-
11 & 12
Zone 2B Division 31 20-Nov-2017 21-Nov-2017 11:30 AM 22-Nov-2017 A Approved Closed
3-L12 and MH-1-L09 and MH-1-L11 and MH-1A-L11 and MH-3-L09
and MH-1-L12 and MH-2-L12
Inspection Form work for base & wall and concrete Pouring for Storm
Manholes (Precast yard) Line 1 & 4 &
Zone 1B & 2B
2563 KHEP-CI-2563 Zone 1B & 2B & 3B & 4B, Line 1 & 4 & 13 & 25 & 30 & 27, 13 & 25 & 30
& 3B & 4B
Division 33 14-Nov-2017 15-Nov-2017 2:30 PM 16-Nov-2017 A Approved Closed
MH-111A-L27 to MH-94-L25 and MH-60-L13 and MH-15-L04 and & 27
MH-09-L01 and MH-106-L30
Second Coat, Bituminous Damproofing installation inspection for
Sewer manholes base
Zone 1B, Line 3 & 4 & 5 & 6 & 7 & 8, MH-1-L03 and MH-1-L03 and Line 3 & 4 &
2564 KHEP-CI-2564
MH-1A-L03 and MH-1-L04 and MH-2-L04 and MH-1-L05 and MH-2- 5 & 6 & 7 & 8
Zone 1B Division 31 14-Nov-2017 15-Nov-2017 2:30 PM 16-Nov-2017 A Approved Closed
L05 and MH-1-L06 and MH-1-L07 and MH-1-L08 and MH-2-L08 and
MH-3-L08 and MH-4-L08
Concrete sampling, testing and placement inspection for RC Column
Cluster 39,
2565 KHEP-CI-2565 Neck Cluster 39,
BC6
NA Division 03 14-Nov-2017 15-Nov-2017 9:00 AM 15-Nov-2017 A Approved Closed
BC6
Cast in place concrete formwork inspection for Rc First Floor Slab &
2566 KHEP-CI-2566 Stair Cluster 3, A6 NA Division 03 14-Nov-2017 15-Nov-2017 10:00 AM 16-Nov-2017 A Approved Closed
Cluster 3, A6
Installation of reinforced steel bar, embedded item & form closure
2567 KHEP-CI-2567 inspection for RC First Floor Slab & Stair Cluster 3, A6 NA Division 03 14-Nov-2017 15-Nov-2017 10:00 AM 16-Nov-2017 A Approved Closed
Cluster 3, A6

Cast in place concrete formwork inspection for Column First Floor Approved w/
2568 KHEP-CI-2568
Cluster 8, B2
Cluster 8, B2 NA Division 03 14-Nov-2017 15-Nov-2017 10:00 AM 16-Nov-2017 B comments
Closed

Installation of reinforced steel bar, embedded item & form closure


Approved w/
2569 KHEP-CI-2569 inspection for RC First Floor Slab & Stair Cluster 19 B2 NA Division 03 15-Nov-2017 15-Nov-2017 10:00 AM 18-Nov-2017 B comments
Closed
Cluster 19, B2
Cast in place concrete formwork inspection for RC First Floor Slab &
Approved w/
2570 KHEP-CI-2570 Stair Cluster Cluster 19 B2 NA Division 03 15-Nov-2017 15-Nov-2017 10:00 AM 18-Nov-2017 B comments
Closed
19, B2
Cast in place concrete formwork inspection for Column Ground Floor
Cluster 44,
2571 KHEP-CI-2571 axis (A-G)
A6
NA Division 03 15-Nov-2017 15-Nov-2017 2:00 PM 18-Nov-2017 A Approved Closed
Cluster 44, A6
Installation of reinforced steel bar, embedded item & form closure
2572 KHEP-CI-2572 inspection for RC Column (Ground Floor) Cluster 63, B2 NA Division 03 15-Nov-2017 15-Nov-2017 10:00 AM 18-Nov-2017 A Approved Closed
Cluster 63, B2
Second Coat, Damproofing installation Inspection for RC Footing &
Cluster 76,
2573 KHEP-CI-2573 Column Neck
BC4
NA Division 03 15-Nov-2017 15-Nov-2017 9:30 AM 18-Nov-2017 A Approved Closed
Cluster 76, BC4
First Coat, Damproofing installation Inspection for RC Footing &
Cluster 79,
2574 KHEP-CI-2574 Column Neck
BC4
NA Division 03 15-Nov-2017 15-Nov-2017 11:00 AM 19-Nov-2017 A Approved Closed
Cluster 79, BC4
Cast in place concrete formwork inspection for RC column First Floor
2575 KHEP-CI-2575 Cluster 75, Cluster 75, B2 NA Division 03 15-Nov-2017 15-Nov-2017 10:30 AM 19-Nov-2017 A Approved Closed
B2
Compaction test of Sand bedding under pipe trench Storm Maine
Approved w/
2576 KHEP-CI-2576 Line Dia 400mm Zone Line 1 Zone 2B Division 31 15-Nov-2017 15-Nov-2017 11:30 AM 18-Nov-2017 B comments
Closed
2B, Line 1, MH-1-L01 to MH-2-L01
Compaction test First and Final layer Structural Fill (Selected Fill)
Cluster 62,
2577 KHEP-CI-2577 Zone 3B,
BC6
Zone 3B Division 31 15-Nov-2017 15-Nov-2017 11:30 AM 18-Nov-2017 A Approved Closed
Cluster 62, BC6
Inspection of Reinforcement steel bar, Form work for base for Sewer
GRP Manholes (Precast yard) Zone 2B, Line
Line 27 & 28
2578 KHEP-CI-2578 27 & 28 & 29 & 30, MH-2-L27 to MH-1-L27 and MH-1-L28 and MH-
& 29 & 30
Zone 2B Division 33 15-Nov-2017 15-Nov-2017 10:00 AM 18-Nov-2017 A Approved Closed
1A-L28 and MH-3-L30 and MH-2-L30 and MH-1-L29 and MH-1A-L29
and MH-1-L30 and MH-1A-L30
Inspection Form work and concrete Pouring for Sewer Embedded
Pice (From IC to MH 160 mm) at Manholes
Zone 1B, Line 3 & 4 & 5 & 6 & 7 & 8, Line 3 & 4 &
2579 KHEP-CI-2579
MH-3-L03 to MH-2-L03 and MH-1-L04 and MH-2-L04 and MH-1-L05 5 & 6 & 7 & 8
Zone 1B Division 31 15-Nov-2017 15-Nov-2017 2:30 PM 19-Nov-2017 E Rejected Closed
and MH-2-L05 and MH-1-L06 to MH-1-L07 and MH-4-L08 and MH-3-
L08 and MH-1-L08
Inspection Form work and concrete Pouring for Sewer Embedded
Pice (From IC to MH 160 mm) at Manholes
Zone 1B, Line 3 & 4 & 5 & 6 & 7 & 8, Line 3 & 4 &
2579.1 KHEP-CI-2579-01
MH-3-L03 to MH-2-L03 and MH-1-L04 and MH-2-L04 and MH-1-L05 5 & 6 & 7 & 8
Zone 1B Division 31 20-Nov-2017 21-Nov-2017 2:30 PM 22-Nov-2017 A Approved Closed
and MH-2-L05 and MH-1-L06 to MH-1-L07 and MH-4-L08 and MH-3-
L08 and MH-1-L08
Damproofing surface preparation for RC Foundation & Column Neck
Cluster 26,
2580 KHEP-CI-2580 Cluster
BC4
NA Division 07 16-Nov-2017 18-Nov-2017 10:00 AM 19-Nov-2017 A Approved Closed
26, BC4
Cast in place concrete formwork inspection for RC Footing Cluster 38,
2581 KHEP-CI-2581
Cluster 38, BC6 BC6
NA Division 03 16-Nov-2017 18-Nov-2017 10:00 AM 19-Nov-2017 A Approved Closed

Installation of reinforced steel bar, embedded item & form closure


Cluster 38, Approved w/
2582 KHEP-CI-2582 inspection for RC Footing
BC6
NA Division 03 16-Nov-2017 18-Nov-2017 10:00 AM 19-Nov-2017 B comments
Closed
Cluster 38, BC6
70cm, CMU motor and masonry inspection under exterior reinforced
Cluster 36,
2583 KHEP-CI-2583 grade beam Cluster 36,
BC4
NA Division 04 16-Nov-2017 18-Nov-2017 2:00 PM 19-Nov-2017 A Approved Closed
BC4
Check the survey work, elevation and coordinate for billnding under
Grade Beam Cluster 23,
2584 KHEP-CI-2584
Cluster 23, BC4 BC4
NA Division 03 16-Nov-2017 18-Nov-2017 2:00 PM 19-Nov-2017 A Approved Closed

First Coat, Damproofing installation Inspection for RC Footing &


Cluster 40,
2585 KHEP-CI-2585 Column Neck
BC4
NA Division 07 16-Nov-2017 18-Nov-2017 10:00 AM 19-Nov-2017 A Approved Closed
Cluster 40, BC4

Cast in place concrete formwork inspection for RC Grade Beam


2586 KHEP-CI-2586
Cluster 64, B2
Cluster 64, B2 NA Division 03 16-Nov-2017 18-Nov-2017 1:30 PM 19-Nov-2017 A Approved Closed

Installation of reinforced steel bar, embedded item & form closure


2587 KHEP-CI-2587 inspection for RC Grade Beam Cluster 64, B2 NA Division 03 16-Nov-2017 18-Nov-2017 2:00 PM 19-Nov-2017 A Approved Closed
Cluster 64, B2

Cast in place concrete formwork inspection for Rc Stair First Flight Approved w/
2588 KHEP-CI-2588
Cluster 73, B2
Cluster 73, B2 NA Division 03 16-Nov-2017 18-Nov-2017 9:30 AM 19-Nov-2017 B comments
Closed

Installation of reinforced steel bar, embedded item & form closure


2589 KHEP-CI-2589 inspection for RC Stair First Flight Cluster 73, Cluster 73, B2 NA Division 03 16-Nov-2017 18-Nov-2017 10:00 AM 19-Nov-2017 A Approved Closed
B2

Cast in place concrete formwork inspection for Rc Column Neck Cluster 49, Approved w/
2590 KHEP-CI-2590
Cluster 49, BC6 BC6
NA Division 03 16-Nov-2017 18-Nov-2017 10:30 AM 19-Nov-2017 B comments
Closed
Second Coat, Damproofing installation Inspection for RC Footing &
Cluster 79,
2591 KHEP-CI-2591 Column Neck
BC4
NA Division 07 16-Nov-2017 18-Nov-2017 2:00 PM 19-Nov-2017 A Approved Closed
Cluster 79, BC4

Second coat dam proofing installation inspection for CMU, Morter and
Cluster 22,
2592 KHEP-CI-2592 Masonry inspection under exterior reinforced grade beam
BC4
NA Division 07 16-Nov-2017 18-Nov-2017 10:00 AM 19-Nov-2017 A Approved Closed
Cluster 22, BC4

Second Coat, Bituminous Damproofing installation inspection for


Sewer manholes base (Precast yard)
Zone 1B, Line 1 & 2, MH-1-L01 and MH-8-L01 and MH-2-
2593 KHEP-CI-2593 L01 and MH-7-L01 and MH-2-L02 and MH-1-L02 and MH-6-L01 and Line 1 & 2 Zone 1B Division 31 16-Nov-2017 18-Nov-2017 2:00 PM 19-Nov-2017 A Approved Closed
MH-3-L01and MH-4-L01 and MH-14-L01 and MH-3-L02 and MH-15-
L01 and MH-12-L01 and MH-12-L01 and MH-10-L01 and MH-5-L01
and MH-5A-L02
Second Coat, Bituminous Damproofing installation inspection for
Sewer manholes base Zone
Line 3 & 31 &
2594 KHEP-CI-2594 1B, Line 3 & 31 & 33 & 34, MH-1-L34 and MH-1A-L34 and MH-2-L34
33 & 34
Zone 1B Division 31 16-Nov-2017 18-Nov-2017 11:30 AM 19-Nov-2017 A Approved Closed
and MH-1A-L33 and MH-2-L03 and MH-3-L03 and MH-1A-L31 and
MH-1-L31and MH-2-L31 and MH-3-L31
First Coat, Bituminous Damproofing installation inspection for Sewer
2595 KHEP-CI-2595 manholes base Zone 1B, Line 32 & 33 Zone 1B Division 31 16-Nov-2017 18-Nov-2017 11:30 AM 19-Nov-2017 A Approved Closed
Line 32 & 33, MH-1-L32 and MH-1-L33
Second Coat, Bituminous Damproofing installation inspection for
2596 KHEP-CI-2596 Sewer manholes base Zone Line 32 & 33 Zone 1B Division 31 16-Nov-2017 18-Nov-2017 2:30 PM 19-Nov-2017 A Approved Closed
1B, Line 32 & 33, MH-1-L32 and MH-1-L33
Inspection of Gravel Bedding Installation under S.Sewer manholes
base with Geotextile Protection Sheet Sewer main Line Approved w/
2597 KHEP-CI-2597
Zone 1B, Line 1, MH-
Line 1 Zone 1B Division 31 16-Nov-2017 18-Nov-2017 1:30 PM 19-Nov-2017 B comments
Closed
7-L01 and MH-8-L01 and MH-6-L06
Inspection of Gravel Bedding Installation under pipe trench with
Geotextile Protection Sheet Sewer main Line Dia 200mm Approved w/
2598 KHEP-CI-2598
Zone 1B, Line 1, MH-
Line 1 Zone 1B Division 31 16-Nov-2017 18-Nov-2017 11:00 AM 19-Nov-2017 B comments
Closed
8-L01 to MH-7-L01 and MH-7-L01 to MH-6-L01
Compaction test of Sand Filling Above the pipe trench and laying
Approved w/
2599 KHEP-CI-2599 Warning tape Sewer main Line Dia 200mm Line 1 Zone 5C Division 31 16-Nov-2017 18-Nov-2017 10:00 AM 19-Nov-2017 B comments
Closed
Zone 5C, Line 1, MH-22-L01 to MH-21-L01
Compaction test Around Footing general fill (Final layer) Cluster 50,
2600 KHEP-CI-2600
Zone 3B, Cluster 50, BC4 BC4
Zone 3B Division 31 16-Nov-2017 18-Nov-2017 10:30 AM 19-Nov-2017 A Approved Closed

Compaction test Around Footing general fill (Final layer) Cluster 60,
2601 KHEP-CI-2601
Zone 3B, Cluster 60, BC4 BC4
Zone 3B Division 31 16-Nov-2017 18-Nov-2017 1:30 PM 19-Nov-2017 A Approved Closed

Inspection Form work and concrete Pouring for Sewer Embedded


Pice (From IC to MH 160 mm) at Manholes
Line 31 & 32
2602 KHEP-CI-2602 Zone 1B, Line 31 & 32 & 33 & 34, MH-3-
& 33 & 34
Zone 1B Division 31 16-Nov-2017 18-Nov-2017 2:30 PM 19-Nov-2017 A Approved Closed
L31 to MH-2-L31 and MH-1-L31 and MH-1A-L31 and MH-1-L32 and
MH-1-L33 and MH-2-L34 to MH-1-L34
Concrete sampling, testing and placement inspection for RC First
2603 KHEP-CI-2603 Floor & Stair Cluster Cluster 3, A6 NA Division 03 18-Nov-2017 19-Nov-2017 9:00 AM 19-Nov-2017 A Approved Closed
3, A6
70cm, CMU motor and masonry inspection under exterior reinforced
Cluster 37,
2604 KHEP-CI-2604 grade beam Cluster 37,
BC4
NA Division 04 18-Nov-2017 19-Nov-2017 2:00 PM 22-Nov-2017 A Approved Closed
BC4
Installation of reinforced steel bar, embedded item & form closure
2605 KHEP-CI-2605 inspection for RC Column (First Floor) Cluster 3, Cluster 3, A6 NA Division 03 18-Nov-2017 19-Nov-2017 2:00 PM 20-Nov-2017 A Approved Closed
A6
Second Coat, Damproofing installation Inspection for RC Footing &
Cluster 40,
2606 KHEP-CI-2606 Column Neck
BC4
NA Division 07 18-Nov-2017 19-Nov-2017 10:00 AM 20-Nov-2017 A Approved Closed
Cluster 40, BC4

Cast in place concrete formwork inspection for Rc Stair First Flight Cluster 9,
2607 KHEP-CI-2607
Cluster 9, BC4 BC4
NA Division 03 18-Nov-2017 19-Nov-2017 10:00 AM 20-Nov-2017 A Approved Closed

Installation of reinforced steel bar, embedded item & form closure


Cluster 9,
2608 KHEP-CI-2608 inspection for RC Stair First Flight
BC4
NA Division 03 18-Nov-2017 19-Nov-2017 10:00 AM 20-Nov-2017 A Approved Closed
Cluster 9, BC4

Cast in place concrete formwork inspection for Rc Grade Beam


2609 KHEP-CI-2609
Cluster 34, B2
Cluster 34, B2 NA Division 03 18-Nov-2017 19-Nov-2017 10:00 AM 20-Nov-2017 A Approved Closed
Installation of reinforced steel bar, embedded item & form closure
2610 KHEP-CI-2610 inspection for RC Grade Beam Cluster 34, B2 NA Division 03 18-Nov-2017 19-Nov-2017 10:00 AM 20-Nov-2017 A Approved Closed
Cluster 34, B2
Cast in place concrete formwork inspection for Rc Column (Ground
Approved w/
2611 KHEP-CI-2611 Floor) Cluster 33, B2 NA Division 03 18-Nov-2017 19-Nov-2017 2:00 PM 19-Nov-2017 B comments
Closed
Cluster 33, B2

Installation of reinforced steel bar, embedded item & form closure Cluster 70,
2612 KHEP-CI-2612
inspection for RC Column Neck Cluster 70, BC4 BC4
NA Division 03 18-Nov-2017 19-Nov-2017 9:30 AM 20-Nov-2017 A Approved Closed

First Coat, Damproofing installation Inspection for RC Footing &


Cluster 67,
2613 KHEP-CI-2613 Column Neck
A4
NA Division 07 18-Nov-2017 19-Nov-2017 1:30 PM 19-Nov-2017 A Approved Closed
Cluster 67, A4
Compaction test Around Footing general fill (Final layer) Cluster 18
2614 KHEP-CI-2614
Zone 1B, Cluster 18, BC4 BC4
Zone 1B Division 31 18-Nov-2017 19-Nov-2017 1:30 PM 20-Nov-2017 A Approved Closed

Inspection of excavated formation for Pipe Trench Sewer main Line


2615 KHEP-CI-2615 Dia 200mm Zone 1B, Line 2 Zone 1B Division 31 18-Nov-2017 19-Nov-2017 11:30 AM 20-Nov-2017 A Approved Closed
Line 2, MH-5-L02 and MH-5A-L02 and MH-5A-L02 and MH-4-L02

Compaction test Excavated formation level bottom of Foundation


Cluster 80,
2616 KHEP-CI-2616 Zone 4B, Cluster
BC6
Zone 4B Division 31 18-Nov-2017 19-Nov-2017 1:30 PM 23-Nov-2017 E Rejected Closed
80, BC6
Compaction test Excavated formation level bottom of Foundation
Cluster 80,
2616.1 KHEP-CI-2616-01 Zone 4B, Cluster
BC6
Zone 4B Division 31 7-Dec-2017 9-Dec-2017 1:30 PM 11-Dec-2017 A Approved Closed
80, BC6

Inspection of damproofing surface preparation for storm manholes,


(Precast yard) Zone 2B & 3B & Line 1 & 7 & Zone 2B & 3B
2617 KHEP-CI-2617
4B, Line 1 & 7 & 27, MH-111-L27, MH-2-L01 and MH-3-L01 and MH- 27 & 4B
Division 31 18-Nov-2017 19-Nov-2017 11:30 AM 20-Nov-2017 A Approved Closed
16-L07 and MH-17-L07 and MH-18-L07

First coat dam proofing installation inspection for CMU, Morter and
Cluster 25,
2618 KHEP-CI-2618 Masonry inspection under exterior reinforced grade beam
BC4
NA Division 07 19-Nov-2017 20-Nov-2017 10:00 AM 22-Nov-2017 A Approved Closed
Cluster 25, BC4

Cast in place concrete formwork inspection for Stair Second Flight


2619 KHEP-CI-2619
Cluster 19, B2
Cluster 19 B2 NA Division 03 19-Nov-2017 20-Nov-2017 10:00 AM 22-Nov-2017 A Approved Closed

Installation of reinforced steel bar, embedded item & form closure


2620 KHEP-CI-2620 inspection for RC Stair Second Flight Cluster 19 B2 NA Division 03 19-Nov-2017 20-Nov-2017 10:00 AM 22-Nov-2017 A Approved Closed
Cluster 19, B2
Cast in place concrete formwork inspection for First Floor Slab &
Cluster 16 Approved w/
2621 KHEP-CI-2621 Stair Second Flight
BC4
NA Division 03 19-Nov-2017 20-Nov-2017 10:00 AM 23-Nov-2017 B comments
Closed
Cluster 16, BC4

Installation of reinforced steel bar, embedded item & form closure


Cluster 16
2622 KHEP-CI-2622 inspection for RC First Floor Slab & Stair Second Flight
BC4
NA Division 03 19-Nov-2017 20-Nov-2017 10:00 AM 23-Nov-2017 A Approved Closed
Cluster 16, BC4

Check the survey work, elevation and coordinate for blinding under
Cluster 24,
2623 KHEP-CI-2623 Grade beam
BC4
NA Division 03 19-Nov-2017 20-Nov-2017 2:00 PM 23-Nov-2017 A Approved Closed
Cluster 24, BC4
Concrete sampling, testing and placement inspection for Rc Stair
2624 KHEP-CI-2624 First Flight Cluster 54, B2 NA Division 03 19-Nov-2017 20-Nov-2017 9:30 AM 22-Nov-2017 A Approved Closed
Cluster 54, B2
Concrete sampling, testing and placement inspection for Rc Grade
Approved w/
2625 KHEP-CI-2625 Beam Cluster 64, Cluster 64, B2 NA Division 03 19-Nov-2017 20-Nov-2017 9:40 AM 22-Nov-2017 B comments
Closed
B2
Concrete sampling, testing and placement inspection for Rc Column
2626 KHEP-CI-2626 First Floor Cluster 75, B2 NA Division 03 19-Nov-2017 20-Nov-2017 9:50 AM 22-Nov-2017 A Approved Closed
Cluster 75, B2
Second Coat, Damproofing installation Inspection for RC Footing &
Cluster 64,
2627 KHEP-CI-2627 Column Neck
A4
NA Division 07 19-Nov-2017 20-Nov-2017 1:30 PM 22-Nov-2017 A Approved Closed
Cluster 64, A4
Check the survey work, elevation and coordinate for blinding under
Cluster 62,
2628 KHEP-CI-2628 Footing Cluster
BC6
NA Division 03 19-Nov-2017 20-Nov-2017 2:30 PM 22-Nov-2017 A Approved Closed
62, BC6
Installation of reinforced steel bar, embedded item & form closure
2629 KHEP-CI-2629 inspection for RC Column (ground Floor) Cluster 64, B2 NA Division 03 19-Nov-2017 20-Nov-2017 2:00 PM 22-Nov-2017 A Approved Closed
Cluster 64, B2
Concrete sampling, testing and placement inspection for Rc Column
2630 KHEP-CI-2630 First Floor Cluster 8, B2 NA Division 03 19-Nov-2017 20-Nov-2017 9:00 AM 22-Nov-2017 A Approved Closed
Cluster 8, B2

First Coat, Bituminous Damproofing installation inspection for Sewer


manholes base (Precast yard)
2631 KHEP-CI-2631 Zone 2B & 4B, Line 1 & 2, MH-25-L01 and MH-13-L01 and MH-11- Line 1 & 2 Zone 2B & 4B Division 31 19-Nov-2017 20-Nov-2017 11:30 AM 22-Nov-2017 A Approved Closed
L01 and MH-9-L01 and MH-26-L01 and MH-23-L01 and MH-5-L02
and MH-2A-L02 and MH-24-L01 and MH-22-L01 and MH-4-L02

Inspection of concrete pouring for Sewer GRP Manholes, precast


yard Zone 2B,
Line 27 & 28
2632 KHEP-CI-2632 Line 27 & 28 & 29 & 30, MH-2-L27, MH-1-L27 and MH-1-L28 and
& 29 & 30
Zone 2B Division 33 19-Nov-2017 20-Nov-2017 10:00 AM 22-Nov-2017 A Approved Closed
MH-1A-L28 and MH-3-L30 and MH-2-L30 and MH-1-L29 and MH-1A-
L29 and MH-1-L30 and MH-1A-L30
Box closing & Grouting for storm embedded pice at manhole
Zone 1B, Line 15, MH-49-L15
2633 KHEP-CI-2633
(two side), MH-50-L15 (Two sides) and MH-51-L15 (two side), MH-
Line 15 Zone 1B Division 33 19-Nov-2017 20-Nov-2017 2:00 PM 22-Nov-2017 A Approved Closed
52-L15 (Two sides)
Inspection of sand filling around pipe - storm Maine line Dia 500mm
2634 KHEP-CI-2634
Zone 2B, Line 9, MH-I25-L09 to MH-26-L08
Line 9 Zone 2B Division 31 13-Feb-2018 14-Feb-2018 11:00 AM 17-Feb-2018 A Approved Closed

Cast in Place Concrete formwork inspection For RC First Floor Slab Approved w/
2635 KHEP-CI-2635
Cluster 48, B2
Cluster 48, B2 NA Division 03 19-Nov-2017 20-Nov-2017 10:30 AM 23-Nov-2017 B comments
Closed

Installation of reinforcing steel bar embedded item and form closure


2636 KHEP-CI-2636 inspection for RC First Floor Slab Cluster 48, B2 NA Division 03 19-Nov-2017 20-Nov-2017 11:00 AM 23-Nov-2017 A Approved Closed
Cluster 48, B3
Compaction test (First Layer) for Backfilling of pre final Layer under
2637 KHEP-CI-2637 slab on grade axis (E-J) Cluster 02 A6 NA Division 03 19-Nov-2017 20-Nov-2017 10:00 AM 23-Nov-2017 A Approved Closed
Cluster 2, A6
Concrete sampling, testing and placement inspection for RC Grade
2638 KHEP-CI-2638 Beam Cluster 34, B2 NA Division 03 20-Nov-2017 21-Nov-2017 9:00 AM 23-Nov-2017 A Approved Closed
Cluster 34, B2
Concrete sampling, testing and placement inspection for RC Column
2639 KHEP-CI-2639 Ground Floor Cluster 33, B2 NA Division 03 20-Nov-2017 21-Nov-2017 9:00 AM 23-Nov-2017 A Approved Closed
Cluster 33, B2
Installation of reinforcing steel bar embedded item and form closure
2640 KHEP-CI-2640 inspection for RC Column Ground Floor Cluster 34, B2 NA Division 03 20-Nov-2017 21-Nov-2017 2:00 PM 23-Nov-2017 A Approved Closed
Cluster 34, B2
Check the survey work, elevation and coordinate for blinding under
Cluster 18
2641 KHEP-CI-2641 grade beam
BC4
NA Division 03 20-Nov-2017 21-Nov-2017 2:00 PM 23-Nov-2017 A Approved Closed
Cluster 18, BC4
Concrete sampling, testing and placement inspection for RC Grade
2642 KHEP-CI-2642 Beam Cluster 72, B2 NA Division 03 20-Nov-2017 21-Nov-2017 9:30 AM 23-Nov-2017 A Approved Closed
Cluster 72, B2
Termite control surface preparation, installation and final inspection
Cluster 62,
2643 KHEP-CI-2643 for Footing
BC6
NA Division 03 20-Nov-2017 21-Nov-2017 9:00 AM 23-Nov-2017 A Approved Closed
Cluster 62, BC6
Installation of reinforced steel bar, embedded item & form closure
2644 KHEP-CI-2644 inspection for RC Column (Ground Floor) Cluster 72, B2 NA Division 03 20-Nov-2017 21-Nov-2017 1:30 PM 26-Nov-2017 E Rejected Closed
Cluster 72, B2
Installation of reinforced steel bar, embedded item & form closure
2644.1 KHEP-CI-2644-01 inspection for RC Column (Ground Floor) Cluster 72, B2 NA Division 03 26-Nov-2017 27-Nov-2017 11:00 AM 28-Nov-2017 A Approved Closed
Cluster 72, B2
Check the survey work, elevation and coordinate for blinding under
Cluster 50,
2645 KHEP-CI-2645 grade beam
BC4
NA Division 03 20-Nov-2017 21-Nov-2017 10:30 AM 23-Nov-2017 A Approved Closed
Cluster 50, BC4
Check the survey work, elevation and coordinate for blinding under
Cluster 60,
2646 KHEP-CI-2646 grade beam
BC4
NA Division 03 20-Nov-2017 21-Nov-2017 10:45 AM 23-Nov-2017 A Approved Closed
Cluster 60, BC4
Inspection of excavated formation for Pipe Trench Sewer main Line
2647 KHEP-CI-2647 Dia 200mm Zone 1B, Line 2 Zone 1B Division 31 28-Nov-2017 29-Nov-2017 11:30 AM 30-Nov-2017 A Approved Closed
Line 2, MH-4-L02 to MH-3-L02
Compaction test of Sand Filling Above the pipe trench Storm Maine
2648 KHEP-CI-2648 Line Dia 400mm Zone Line 23 Zone 4B Division 31 20-Nov-2017 21-Nov-2017 11:00 AM RECALLED
4B, Line 23, MH-I85-L23 to MH-87-L22
Inspection of Reinforcement steel bar and Internal Shutter for
Manholes (Precast yard) Zone Line 4 & 10 &
2649 KHEP-CI-2649 1B & 4B, Line 4 & 10 & 13 & 30 & 27 & 26, MH-114-L27 and MH- 13 & 30 & 27 Zone 1B & 4B Division 33 20-Nov-2017 21-Nov-2017 2:30 PM 23-Nov-2017 A Approved Closed
116-L26 and MH-30-L04 and MH-107A-L30 and MH-32-L10 and MH- & 26
59-L13 and MH-107-L30
First Coat, Damproofing installation Inspection for RC Footing &
Cluster 26,
2650 KHEP-CI-2650 Column Neck
BC4
NA Division 07 20-Nov-2017 21-Nov-2017 2:00 PM 23-Nov-2017 A Approved Closed
Cluster 26, BC4

Inspection of gravel bedding installation under S.Sewer Manhole


2651 KHEP-CI-2651 base with geotextile protection sheet Sewer main line Line 1 Zone 1B Division 31 27-Nov-2017 28-Nov-2017 1:30 PM 29-Nov-2017 A Approved Closed
Zone 1B, Line 1, MH-6-L01

Second Coat, Damproofing installation Inspection for RC Footing &


Cluster 26,
2652 KHEP-CI-2652 Column Neck
BC4
NA Division 07 22-Nov-2017 23-Nov-2017 10:00 AM 25-Nov-2017 A Approved Closed
Cluster 26, BC4

Second coat dam proofing installation inspection for CMU, Morter and
Cluster 25,
2653 KHEP-CI-2653 Masonry inspection under exterior reinforced grade beam
BC4
NA Division 07 22-Nov-2017 23-Nov-2017 10:00 AM 25-Nov-2017 A Approved Closed
Cluster 25, BC4

Cast in place concrete formwork inspection for Rc Column Ground


2654 KHEP-CI-2654 floor Cluster 63, Cluster 63, B2 NA Division 03 22-Nov-2017 23-Nov-2017 10:00 AM 25-Nov-2017 A Approved Closed
B2
Termite control surface preparation, installation and final inspection
Cluster 60,
2655 KHEP-CI-2655 for Grade Beam
BC4
NA Division 03 22-Nov-2017 23-Nov-2017 9:30 AM 26-Nov-2017 A Approved Closed
Cluster 60, BC4
Termite control surface preparation, installation and final inspection
Cluster 50,
2656 KHEP-CI-2656 for Grade Beam
BC4
NA Division 03 22-Nov-2017 23-Nov-2017 9:40 AM 26-Nov-2017 A Approved Closed
Cluster 50, BC4
Termite control surface preparation, installation and final inspection
Cluster 69,
2657 KHEP-CI-2657 for Slab on Grade - Unit B
BC2
NA Division 03 22-Nov-2017 23-Nov-2017 10:00 AM 25-Nov-2017 A Approved Closed
Cluster 69, BC2
Compaction test (First layer) for backfilling of pre final layer under
2658 KHEP-CI-2658 slab on grde axis (J-N) Cluster 02 A6 NA Division 03 22-Nov-2017 23-Nov-2017 10:00 AM 25-Nov-2017 A Approved Closed
Cluster 2, A6

Compaction test (Second layer) final layer under slab on grade


2659 KHEP-CI-2659
Cluster 15, B2
Cluster 15 B2 NA Division 03 22-Nov-2017 23-Nov-2017 10:00 AM 25-Nov-2017 A Approved Closed

Compaction test (Second layer) final layer under slab on grade


2660 KHEP-CI-2660
Cluster 1, A6
Cluster 01 A6 NA Division 03 22-Nov-2017 23-Nov-2017 10:00 AM 25-Nov-2017 A Approved Closed

Compaction test (Second layer) final layer under slab on grade axis
2661 KHEP-CI-2661 (A-E) Cluster 2, Cluster 02 A6 NA Division 03 22-Nov-2017 23-Nov-2017 10:00 AM 25-Nov-2017 A Approved Closed
A6
Installation of reinforcing steel bar embedded item and form closure
2662 KHEP-CI-2662 inspection for RC Column First Floor Cluster 19 B2 NA Division 03 22-Nov-2017 23-Nov-2017 2:00 PM 25-Nov-2017 A Approved Closed
Cluster 19, B2
Cast in place concrete formwork inspection for Grade beam Cluster 43,
2663 KHEP-CI-2663
Cluster 43, A6 A6
NA Division 03 22-Nov-2017 23-Nov-2017 10:00 AM 25-Nov-2017 A Approved Closed

Installation of reinforcing steel bar embedded item and form closure


Cluster 43,
2664 KHEP-CI-2664 inspection for RC Grade beam
A6
NA Division 03 22-Nov-2017 23-Nov-2017 10:00 AM 25-Nov-2017 A Approved Closed
Cluster 43, A6
Cast in place concrete formwork inspection for Rc Slab on Grade
2665 KHEP-CI-2665 Ground Floor (Unit B) Cluster 69, B2 NA Division 03 23-Nov-2017 25-Nov-2017 10:00 AM 28-Nov-2017 A Approved Closed
Cluster 69, B2
Installation of reinforcing steel bar embedded item and form closure
Approved w/
2666 KHEP-CI-2666 inspection for RC Slab on Grade Ground Floor (Unit B) Cluster 69, B2 NA Division 03 23-Nov-2017 25-Nov-2017 10:30 AM 28-Nov-2017 B comments
Closed
Cluster 69, B2
Installation of reinforcing steel bar embedded item and form closure
2667 KHEP-CI-2667 inspection for RC Column First Floor Cluster 61, B2 NA Division 03 23-Nov-2017 25-Nov-2017 10:00 AM 26-Nov-2017 A Approved Closed
Cluster 61, B2
Check the survey work, elevation and coordinate for blinding under
2668 KHEP-CI-2668 grade beam Cluster 30, B2 NA Division 03 23-Nov-2017 25-Nov-2017 2:00 PM 26-Nov-2017 A Approved Closed
Cluster 30, B2
Check the survey work, elevation and coordinate for blinding under
Cluster 32,
2669 KHEP-CI-2669 Footing
BC6
NA Division 03 23-Nov-2017 25-Nov-2017 2:00 PM 27-Nov-2017 A Approved Closed
Cluster 32, BC6
Box closing & Grouting for storm embedded short pipe connecting to
Approved w/
2670 KHEP-CI-2670 manhole Zone 1B, Line Zone 1B Line 15 Division 33 23-Nov-2017 25-Nov-2017 11:00 AM 26-Nov-2017 B comments
Closed
15, MH-48-L15 and MH-47-L15
Cast in place concrete formwork inspection for Rc Column (First
2671 KHEP-CI-2671 Floor) axis (A,B,C,D,E,F) Cluster 3, A6 NA Division 03 23-Nov-2017 25-Nov-2017 2:00 PM 27-Nov-2017 A Approved Closed
Cluster 3, A6
Concrete sampling, testing and placement inspection for RC Column
Cluster 9,
2672 KHEP-CI-2672 Stair First Flight
BC4
NA Division 03 23-Nov-2017 25-Nov-2017 9:00 AM 27-Nov-2017 A Approved Closed
Cluster 9, BC4
Concrete sampling, testing and placement inspection for RC Column
2673 KHEP-CI-2673 First Floor Slab & Stair Cluster 19 B2 NA Division 03 23-Nov-2017 25-Nov-2017 9:00 AM 27-Nov-2017 A Approved Closed
Cluster 19, B2
Termite control surface preparation, installation and final inspection
Cluster 18
2674 KHEP-CI-2674 for Grade Beam Cluster
BC4
NA Division 03 23-Nov-2017 25-Nov-2017 10:00 AM 27-Nov-2017 A Approved Closed
18, BC4
Termite control surface preparation, installation and final inspection
Cluster 23,
2675 KHEP-CI-2675 for Grade Beam Cluster
BC4
NA Division 03 23-Nov-2017 25-Nov-2017 10:00 AM 27-Nov-2017 A Approved Closed
23, BC4

Cast in place concrete formwork inspection for Rc Stair First Flight


2676 KHEP-CI-2676
Cluster 27, B2
Cluster 27, B2 NA Division 03 23-Nov-2017 25-Nov-2017 10:00 AM 27-Nov-2017 A Approved Closed

Installation of reinforcing steel bar embedded item and form closure


2677 KHEP-CI-2677 inspection for RC Stair First Flight Cluster 27, B2 NA Division 03 23-Nov-2017 25-Nov-2017 10:00 AM 27-Nov-2017 A Approved Closed
Cluster 27, B2
Cast in place concrete formwork inspection for Rc First Floor slab &
2678 KHEP-CI-2678 Stair Cluster Cluster 20 B2 NA Division 03 23-Nov-2017 25-Nov-2017 10:00 AM 27-Nov-2017 A Approved Closed
20, B2
Installation of reinforcing steel bar embedded item and form closure
2679 KHEP-CI-2679 inspection for RC First Floor slab & Stair Cluster 20 B2 NA Division 03 23-Nov-2017 25-Nov-2017 10:00 AM 27-Nov-2017 A Approved Closed
Cluster 20, B2
Blinding Concrete sampling, testing and placement inspection for
Cluster 18
2680 KHEP-CI-2680 Grade Beam
BC4
NA Division 03 25-Nov-2017 26-Nov-2017 9:00 AM 27-Nov-2017 A Approved Closed
Cluster 18, BC4
Blinding Concrete sampling, testing and placement inspection for
Cluster 23,
2681 KHEP-CI-2681 Grade Beam
BC4
NA Division 03 25-Nov-2017 26-Nov-2017 9:00 AM 27-Nov-2017 A Approved Closed
Cluster 23, BC4
Blinding Concrete sampling, testing and placement inspection for Rc
Cluster 44,
2682 KHEP-CI-2682 Ground Floor
A6
NA Division 03 25-Nov-2017 26-Nov-2017 9:00 AM 27-Nov-2017 A Approved Closed
Cluster 44, A6
Inspection Form work for base & wall and concrete Pouring for Storm
Manholes (Precast yard) Line 4 & 10 &
2683 KHEP-CI-2683 Zone 1B & 4B, Line 4 & 10 & 13 & 30 & 27 & 26, MH-114- 13 & 30 & 27 Zone 1B & 4B Division 33 25-Nov-2017 26-Nov-2017 2:30 PM 27-Nov-2017 A Approved Closed
L27 and MH-116-L26 and MH-30-L04 and MH-107A-L30 and MH-32- & 26
L10 and MH-59-L13 and MH-107-L30
Cast in place concrete formwork inspection for First Floor Slab &
2684 KHEP-CI-2684 Stair Second Flight Cluster 71, B2 NA Division 03 25-Nov-2017 26-Nov-2017 2:00 PM 27-Nov-2017 E Rejected Closed
Cluster 71, B2
Cast in place concrete formwork inspection for First Floor Slab &
2684.1 KHEP-CI-2684-01 Stair Second Flight Cluster 71, B2 NA Division 03 27-Nov-2017 28-Nov-2017 2:00 PM 30-Nov-2017 A Approved Closed
Cluster 71, B2

Installation of reinforcing steel bar embedded item and form closure


2685 KHEP-CI-2685 inspection for RC First Floor Slab & Stair Second Flight Cluster 71, B2 NA Division 03 25-Nov-2017 26-Nov-2017 2:30 PM 28-Nov-2017 E Rejected Closed
Cluster 71, B2

Installation of reinforcing steel bar embedded item and form closure


2685.1 KHEP-CI-2685-01 inspection for RC First Floor Slab & Stair Second Flight Cluster 71, B2 NA Division 03 28-Nov-2017 29-Nov-2017 10:30 AM 30-Nov-2017 A Approved Closed
Cluster 71, B2

First coat dam proofing installation inspection for CMU, Morter and
Cluster 55,
2686 KHEP-CI-2686 Masonry inspection under exterior reinforced grade beam
BC4
NA Division 07 25-Nov-2017 26-Nov-2017 10:00 AM 27-Nov-2017 A Approved Closed
Cluster 55, BC4

Cast in place concrete formwork inspection for Rc Column First Floor


2687 KHEP-CI-2687
Cluster 19, B2
Cluster 19 B2 NA Division 03 25-Nov-2017 26-Nov-2017 10:00 AM 27-Nov-2017 A Approved Closed

Cast in place concrete formwork inspection for Rc Column Ground


2688 KHEP-CI-2688 Floor Cluster Cluster 34, B2 NA Division 03 25-Nov-2017 26-Nov-2017 10:00 AM 27-Nov-2017 A Approved Closed
34, B2
cast in place concrete formwork inspection for RC column ( first floor
) axis
2689 KHEP-CI-2689 (G3,GG4,G5,H1,H2,H3,H4,H5,J3,K1,K2,K3,K4,K5,L3,L4,L5,M1,M2,M3, Cluster 3, A6 NA Division 03 25-Nov-2017 26-Nov-2017 10:00 AM 28-Nov-2017 A Approved Closed
M4,M5,N2,N3) Cluster
3, A6
Blinding Concrete sampling, testing and placement inspection for
Cluster 62,
2690 KHEP-CI-2690 Footing
BC6
NA Division 03 26-Nov-2017 27-Nov-2017 9:00 AM 28-Nov-2017 A Approved Closed
Cluster 62, BC6
Concrete sampling, testing and placement inspection for RC Grade
Cluster 43,
2691 KHEP-CI-2691 beam
A6
NA Division 03 26-Nov-2017 27-Nov-2017 9:00 AM 28-Nov-2017 A Approved Closed
Cluster 43, A6
Concrete sampling, testing and placement inspection for RC Footing
Cluster 38,
2692 KHEP-CI-2692 Cluster 38,
BC6
NA Division 03 26-Nov-2017 27-Nov-2017 9:00 AM 28-Nov-2017 A Approved Closed
BC6
Termite control surface preparation, installation and final inspection
Cluster 32,
2693 KHEP-CI-2693 for Footing Cluster 32,
BC6
NA Division 03 26-Nov-2017 27-Nov-2017 10:00 AM 28-Nov-2017 A Approved Closed
BC6

Compaction test (Second layer) Final layer under slab on grade on


2694 KHEP-CI-2694
axis (E-J) Cluster 2, A6
Cluster 02 A6 NA Division 03 26-Nov-2017 27-Nov-2017 11:00 AM 28-Nov-2017 A Approved Closed

Cast in place concrete formwork inspection for Rc Column Ground


2695 KHEP-CI-2695 Floor Cluster Cluster 35, B2 NA Division 03 26-Nov-2017 27-Nov-2017 2:00 PM 28-Nov-2017 A Approved Closed
35, B2

Second coat dam proofing installation inspection for CMU, Morter and
Cluster 55,
2696 KHEP-CI-2696 Masonry inspection under exterior reinforced grade beam
BC4
NA Division 03 26-Nov-2017 27-Nov-2017 9:30 AM 28-Nov-2017 A Approved Closed
Cluster 55, BC4

Damproofing surface preparation for RC Footing & Column Neck Cluster 74,
2697 KHEP-CI-2697
Cluster 74, BC4 BC4
NA Division 07 26-Nov-2017 27-Nov-2017 10:00 AM 28-Nov-2017 E Rejected Closed

Damproofing surface preparation for RC Footing & Column Neck Cluster 74,
2697.1 KHEP-CI-2697-01
Cluster 74, BC4 BC4
NA Division 07 29-Nov-2017 30-Nov-2017 10:00 AM 30-Nov-2017 A Approved Closed

Cast in place concrete form work inspection for RC Column (First


2698 KHEP-CI-2698 Floor) Cluster 61, B2 NA Division 03 26-Nov-2017 27-Nov-2017 10:15 AM 28-Nov-2017 A Approved Closed
Cluster 61, B2

Cast in place concrete form work inspection for RC Column Neck Cluster 70,
2699 KHEP-CI-2699
Cluster 70, BC4 BC4
NA Division 03 26-Nov-2017 27-Nov-2017 10:30 AM 28-Nov-2017 E Rejected Closed

Cast in place concrete form work inspection for RC Column Neck Cluster 70,
2699.1 KHEP-CI-2699-01
Cluster 70, BC4 BC4
NA Division 03 28-Nov-2017 29-Nov-2017 10:30 AM 30-Nov-2017 A Approved Closed

First Coat, Bituminous Damproofing installation inspection for Sewer


manholes base (Precast yard)
Zone 2B & 1B, Line 2 & 9 & 10 & 11 & 12 & 27, MH-6-L02 and Line 2 & 9 &
2700 KHEP-CI-2700 MH-1A-L09 and MH-1-L11 and MH-3-L27 and MH-3-L09 and MH-1A- 10 & 11 & 12 Zone 2B & 1B Division 31 26-Nov-2017 27-Nov-2017 2:30 PM 28-Nov-2017 A Approved Closed
L10 and MH-5-L27 and MH-2-L09 and MH-1-L09 and MH-1A-L11 & 27
and MH-1-L10 and MH-1-L12 and MH-3-L12 and MH-2-L12 and
MH-4-L27
Inspection Form work and concrete Pouring for Storm Embedded
Pice at Manholes
2701 KHEP-CI-2701 Zone 1B, Line 15, MH-47-L15 two side MH-50-L15 two side MH-48- Line 15 Zone 1B Division 33 26-Nov-2017 27-Nov-2017 2:00 PM 30-Nov-2017 A Approved Closed
L15 two side MH-51-L15 two side MH-49-L16 two side MH-52-L15
two side
Second Coat, Bituminous Damproofing installation inspection for
Sewer manholes base (Precast yard)
Zone 2B & 4B, Line 1 & 2, MH-25-L01 and MH-13-L01 and
2702 KHEP-CI-2702
MH-11-L01 and MH-9-L01 and MH-26-L01 and MH-23-L01 and MH-
Zone 2B & 4B Line 1 & 2 Division 31 26-Nov-2017 27-Nov-2017 11:30 AM 28-Nov-2017 A Approved Closed
5-L02 and MH-2A-L02 and MH-24-L01 and MH-22-L01 and MH-4-
L02
Termite control surface preparation,installation and final inspection
2703 KHEP-CI-2703 for grade beam Cluster 30, B2 NA Division 03 26-Nov-2017 27-Nov-2017 10:00 AM 28-Nov-2017 A Approved Closed
Cluster 30, B2

First Coat dam proofing installation inspection for CMU, Morter and
Cluster 37,
2704 KHEP-CI-2704 Masonry inspection under exterior reinforced grade beam
BC4
NA Division 07 26-Nov-2017 27-Nov-2017 2:00 PM 28-Nov-2017 A Approved Closed
Cluster 37, BC4
First Coat dam proofing installation inspection for CMU, Morter and
Cluster 36,
2705 KHEP-CI-2705 Masonry inspection under exterior reinforced grade beam
BC4
NA Division 07 27-Nov-2017 28-Nov-2017 3:00 PM 28-Nov-2017 A Approved Closed
Cluster 36, BC4

Cast in place concrete form work inspection for RC First Floor Slab &
Cluster 6, Approved w/
2706 KHEP-CI-2706 Stair
BC4
NA Division 03 27-Nov-2017 28-Nov-2017 10:00 AM 30-Nov-2017 B comments
Closed
Cluster 6, BC4
Installation of reinforcing steel bar embedded item and form closure
Cluster 6,
2707 KHEP-CI-2707 inspection for RC First Floor Slab & Stair
BC4
NA Division 03 27-Nov-2017 28-Nov-2017 10:00 AM 30-Nov-2017 A Approved Closed
Cluster 6, BC4

Cast in place concrete form work inspection for RC Grade Beam Cluster 21,
2708 KHEP-CI-2708
Cluster 21, BC4 BC4
NA Division 03 27-Nov-2017 28-Nov-2017 10:00 AM 30-Nov-2017 A Approved Closed

Installation of reinforcing steel bar embedded item and form closure


Cluster 21,
2709 KHEP-CI-2709 inspection for RC Grade Beam
BC4
NA Division 03 27-Nov-2017 28-Nov-2017 10:00 AM 30-Nov-2017 A Approved Closed
Cluster 21, BC4
Blinding Concrete sampling, testing and placement inspection for
2710 KHEP-CI-2710 Grade beam Cluster 30, B2 NA Division 03 27-Nov-2017 28-Nov-2017 9:00 AM 28-Nov-2017 A Approved Closed
Cluster 30, B2
Blinding Concrete sampling, testing and placement inspection for
Cluster 32,
2711 KHEP-CI-2711 Footing
BC6
NA Division 03 27-Nov-2017 28-Nov-2017 9:00 AM 28-Nov-2017 A Approved Closed
Cluster 32, BC6

Second Coat dam proofing installation inspection for CMU, Morter


Cluster 37,
2712 KHEP-CI-2712 and Masonry inspection under exterior reinforced grade beam
BC4
NA Division 07 27-Nov-2017 28-Nov-2017 10:00 AM 30-Nov-2017 A Approved Closed
Cluster 37, BC4

Damproofing surface preparation for RC Foundation & Column Neck


Cluster 39,
2713 KHEP-CI-2713 Cluster
BC6
NA Division 07 27-Nov-2017 28-Nov-2017 3:00 PM 30-Nov-2017 A Approved Closed
39, BC6
Concrete sampling, testing and placement inspection for RC (First
2714 KHEP-CI-2714 Floor Slab) & stair (2nd flight) Cluster 48, B2 NA Division 03 27-Nov-2017 28-Nov-2017 9:30 AM 28-Nov-2017 A Approved Closed
Cluster 48, B2
40cm, CMU, Mortar and Masonry Inspection Under Exterior
Cluster 56,
2715 KHEP-CI-2715 Reinforced Grade Beam
BC4
NA Division 04 27-Nov-2017 28-Nov-2017 10:00 AM 28-Nov-2017 A Approved Closed
Cluster 56, BC4
Second Coat, Bituminous Damproofing installation inspection for
Sewer manholes base (Precast yard)
Zone 2B & 1B, Line 2 & 9 & 10 & 11 & 12 & 27, MH-6-L02 Line 2 & 9 &
2716 KHEP-CI-2716 and MH-1A-L09 and MH-1-L11 and MH-3-L27 and MH-3-L09 and Zone 2B & 1B 10 & 11 & 12 Division 31 27-Nov-2017 28-Nov-2017 3:30 PM 30-Nov-2017 A Approved Closed
MH-1A-L10 and MH-5-L27 and MH-2-L09 and MH-1-L09 and MH-1A- & 27
L11 and MH-1-L10 and MH-1-L12 and MH-3-L12 and MH-2-L12 and
MH-4-L27
Installation for Sewer GRP Manholes Sewer main Line
2717 KHEP-CI-2717 Zone 1B, Line 1, MH-8-L01 and MH-7-L01 Line 1 Zone 1B Division 31 27-Nov-2017 28-Nov-2017 1:30 PM 29-Nov-2017 A Approved Closed
and MH-6-L01
Inspection Form work and concrete Pouring for Storm Embedded
Pice at Manholes
2718 KHEP-CI-2718
Zone 1B, Line 8, MH-21-L08 one side MH-26-L08 two side MH-26a-
Line 8, Zone 1B Division 33 27-Nov-2017 28-Nov-2017 11:00 AM 30-Nov-2017 A Approved Closed
L08 two side
First Coat, Bituminous Damproofing installation inspection for Storm
manholes base (Precast yard)
Line 1 & 7 & Zone 2B & 3B
2719 KHEP-CI-2719 Zone 2B & 3B & 4B, Line 1 & 7 & 27, MH-111-L27 and MH-2-L01
27 & 4B
Division 33 27-Nov-2017 28-Nov-2017 2:30 PM 30-Nov-2017 A Approved Closed
and MH-3-L01 and MH-16-L07 and MH-3-L01 and MH-16-L07 and
MH-17-L07 and MH-18-L07
Compaction test Around Footing General Fill (Final Layer)
Cluster 22,
2720 KHEP-CI-2720 Zone 2B, Cluster
BC4
Zone 2B Division 31 27-Nov-2017 28-Nov-2017 2:30 PM 30-Nov-2017 E Rejected Closed
22, BC4
Compaction test Around Footing General Fill (Final Layer)
Cluster 22, Approved w/
2720.1 KHEP-CI-2720-01 Zone 2B, Cluster
BC4
Zone 2B Division 31 30-Nov-2017 2-Dec-2017 2:30 PM 5-Dec-2017 B comments
Closed
22, BC4
Compaction test Around Footing General Fill (Final Layer)
Cluster 25,
2721 KHEP-CI-2721 Zone 2B, Cluster
BC4
Zone 2B Division 31 27-Nov-2017 28-Nov-2017 3:00 PM 30-Nov-2017 A Approved Closed
25, BC4
Blinding Concrete sampling, testing and placement inspection for
Cluster 60,
2722 KHEP-CI-2722 Grade Beam
BC4
NA Division 03 27-Nov-2017 28-Nov-2017 10:00 AM 28-Nov-2017 A Approved Closed
Cluster 60, BC4
Blinding Concrete sampling, testing and placement inspection for
Cluster 50,
2723 KHEP-CI-2723 Grade Beam
BC4
NA Division 03 27-Nov-2017 28-Nov-2017 10:00 AM 28-Nov-2017 A Approved Closed
Cluster 50, BC4
Compaction test (Second layer) Final layer under slab on grade on
2724 KHEP-CI-2724
axis (J-N) Cluster 2, A6
Cluster 02 A6 NA Division 03 28-Nov-2017 29-Nov-2017 10:00 AM 30-Nov-2017 A Approved Closed

Termite control surface preparation,installation and final inspection


2725 KHEP-CI-2725 for Slab on grade Cluster 15 B2 NA Division 03 28-Nov-2017 29-Nov-2017 10:00 AM 30-Nov-2017 A Approved Closed
Cluster 15, B2

Second Coat dam proofing installation inspection for CMU, Morter


Cluster 36,
2726 KHEP-CI-2726 and Masonry inspection under exterior reinforced grade beam
BC4
NA Division 07 28-Nov-2017 29-Nov-2017 10:00 AM 30-Nov-2017 A Approved Closed
Cluster 36, BC4

Installation of reinforcing steel bar embedded item and form closure


Cluster 43,
2727 KHEP-CI-2727 inspection for RC Column Ground Floor
A6
NA Division 03 28-Nov-2017 29-Nov-2017 10:00 AM 30-Nov-2017 A Approved Closed
Cluster 43, A6
Installation of reinforcing steel bar embedded item and form closure
2728 KHEP-CI-2728 inspection for RC Column - First Floor Cluster 48, B2 NA Division 03 28-Nov-2017 29-Nov-2017 11:00 AM 30-Nov-2017 A Approved Closed
Cluster 48, B2
Inspection of Gravel bedding Installation under pipe trench geotextile
protection sheet sewer main line Dia 200mm
2729 KHEP-CI-2729
Zone 1B, Line 2, MH-5-L02 and MH-5A-L02 and MH-
Line 2 Zone 1B Division 31 28-Nov-2017 29-Nov-2017 11:00 AM 30-Nov-2017 A Approved Closed
5A-L02 and MH-4-L02
Inspection of Dam proofing Surface Preparation for Storm Manholes
Precast yard Zone 1B & 2B Line 1 & 4 &
Zone 1B & 2B
2730 KHEP-CI-2730 & 3B & 4B, Line 1 & 4 & 13 & 25 & 30 & 27, MH-111A-L27 and MH- 13 & 25 & 30
& 3B & 4B
Division 33 28-Nov-2017 29-Nov-2017 2:30 PM 30-Nov-2017 A Approved Closed
94-L25 and MH-60-L13 and MH-15-L04 and MH-09-L01 and MH- & 27
106-L30
Inspection of Reinforcement steel bar Form work for base for Sewer
GRP Manholes (Precast yard)
Zone 2B & 3B & 4B, Line 2, MH-10-L02 and MH-12-L02 and MH-19- Zone 2B & 3B
2731 KHEP-CI-2731
L02 and MH-20-L02 and MH-13-L02 and MH-21-L02 and MH-22-L02
Line 2
& 4B
Division 33 28-Nov-2017 29-Nov-2017 1:30 PM 30-Nov-2017 A Approved Closed
and MH-11-L02 and MH-18-L02 and MH-15-L02 and MH-17-L02 and
MH-14-L02

Sampling Aggregated sub base materials (saad areemat EST) Jobsite Stock
2732 KHEP-CI-2732
Jobsite Stock pile 17 pile 17
NA Division 03 28-Nov-2017 29-Nov-2017 10:30 AM 30-Nov-2017 E Rejected Closed

Sampling Aggregated base Course (saad areemat EST) Jobsite Stock


2733 KHEP-CI-2733
Jobsite Stock pile 18 pile 18
NA Division 03 28-Nov-2017 29-Nov-2017 10:30 AM 30-Nov-2017 E Rejected Closed

Cast in place concrete form work inspection for RC Footing Cluster 62,
2734 KHEP-CI-2734
Cluster 62, BC6 BC6
NA Division 03 29-Nov-2017 30-Nov-2017 9:00 AM 2-Dec-2017 A Approved Closed

Installation of reinforced steel bar, embedded item & form closure


Cluster 62,
2735 KHEP-CI-2735 inspection for RC Footing
BC6
NA Division 03 29-Nov-2017 30-Nov-2017 9:30 AM 2-Dec-2017 A Approved Closed
Cluster 62, BC6
Cast in place concrete form work inspection for RC Column (First
2736 KHEP-CI-2736 Floor ) axis (G2,G6,J1,J4,L2,L6,N4,N1) Cluster 3, A6 NA Division 03 28-Nov-2017 29-Nov-2017 2:00 PM 30-Nov-2017 A Approved Closed
Cluster 3, A6
70cm, CMU motor and masonry inspection under exterior reinforced
Cluster 42,
2737 KHEP-CI-2737 grade beam Cluster 42,
BC4
NA Division 04 28-Nov-2017 29-Nov-2017 2:00 PM 30-Nov-2017 A Approved Closed
BC4
Concrete sampling, testing and placement inspection for RC Column
2738 KHEP-CI-2738 (First Floor) Cluster 19 B2 NA Division 03 29-Nov-2017 30-Nov-2017 9:00 AM 30-Nov-2017 A Approved Closed
Cluster 19, B2
Installation of reinforced steel bar, embedded item & form closure
Cluster 38,
2739 KHEP-CI-2739 inspection for RC Column Neck
BC6
NA Division 03 29-Nov-2017 2-Dec-2017 10:00 AM 3-Dec-2017 B Approved Closed
Cluster 38, BC6

Cast in place concrete form work inspection for RC Column Neck


2740 KHEP-CI-2740
Cluster 31, B2
Cluster 31, B2 NA Division 03 29-Nov-2017 30-Nov-2017 10:00 AM 30-Nov-2017 A Approved Closed

Inspection of sand Filling Around pipe Sewer main line Dia 200mm
2741 KHEP-CI-2741 Zone 1B, Line Line 2 Zone 1B Division 31 29-Nov-2017 30-Nov-2017 11:00 AM 2-Dec-2017 A Approved Closed
2, MH-9-L02 and MH-8-L02 and MH-8-L02 and MH-7-L02

Compaction test excavated formation level bottom of Foundation


Cluster 53,
2742 KHEP-CI-2742 Zone 3B, Cluster
BC6
Zone 3B Division 31 29-Nov-2017 30-Nov-2017 1:30 PM 30-Nov-2017 A Approved Closed
53, BC6
Box closing & Grouting for storm embedded pice at manhole
Zone 2B, Line 7 & 8 & 9, MH- Line 7 & 8 &
2743 KHEP-CI-2743
I24-L09 (two side), MH-I25-L09 (Two sides) and MH-28-L07 (two 9
Zone 2B Division 33 29-Nov-2017 30-Nov-2017 10:30 AM 2-Dec-2017 A Approved Closed
side), MH-26-L08 (One sides) and MH-27-L07 (two side)
Installation for Sewer GRP Manholes Sewer main Line
2744 KHEP-CI-2744 Zone 2B, Line 11 & 12, MH-3-L12 and MH- Line 11 & 12 Zone 2B Division 31 29-Nov-2017 30-Nov-2017 10:30 AM 2-Dec-2017 A Approved Closed
2-L12 and MH-1-L12 and MH-1A-L11
Concrete sampling, testing and placement inspection for RC Slab On
2745 KHEP-CI-2745 Grade Unit B Cluster 69, B2 NA Division 03 29-Nov-2017 30-Nov-2017 9:30 AM 30-Nov-2017 A Approved Closed
Cluster 69, B2
Cast in place concrete form work inspection for RC Column Ground
2746 KHEP-CI-2746 Floor Cluster Cluster 72, B2 NA Division 03 29-Nov-2017 30-Nov-2017 11:00 AM 30-Nov-2017 A Approved Closed
72, B2
First Coat, Damproofing installation Inspection for RC Footing &
Cluster 42,
2747 KHEP-CI-2747 Column Neck
BC4
NA Division 07 30-Nov-2017 2-Dec-2017 9:00 AM 4-Dec-2017 A Approved Closed
Cluster 42, BC4
Second Coat, Damproofing installation Inspection for RC Footing &
Cluster 42,
2748 KHEP-CI-2748 Column Neck
BC4
NA Division 07 30-Nov-2017 2-Dec-2017 3:00 PM 4-Dec-2017 A Approved Closed
Cluster 42, BC4
Concrete sampling, testing and placement inspection for RC Column
2749 KHEP-CI-2749 (Ground Floor) Cluster 34, B2 NA Division 03 30-Nov-2017 2-Dec-2017 9:00 AM 3-Dec-2017 A Approved Closed
Cluster 34, B2
Concrete sampling, testing and placement inspection for RC Column
2750 KHEP-CI-2750 (Ground Floor) Cluster 35, B2 NA Division 03 30-Nov-2017 2-Dec-2017 9:00 AM 3-Dec-2017 A Approved Closed
Cluster 35, B2
Concrete sampling, testing and placement inspection for RC Stair
2751 KHEP-CI-2751 First Flight Cluster 27, B2 NA Division 03 30-Nov-2017 2-Dec-2017 9:00 AM 3-Dec-2017 A Approved Closed
Cluster 27, B2
Concrete sampling, testing and placement inspection for RC First
2752 KHEP-CI-2752 Floor Slab & Stair Cluster 20 B2 NA Division 03 30-Nov-2017 2-Dec-2017 9:00 AM 3-Dec-2017 A Approved Closed
Cluster 20, B2
First Coat, Bituminous Damproofing installation inspection for Storm
manholes base (Precast yard) Line 1 & 4 &
Zone 1B & 2B
2753 KHEP-CI-2753 Zone 1B & 2B & 3B & 4B, Line 1 & 4 & 13 & 25 & 30 & 27, MH- 13 & 25 & 30
& 3B & 4B
Division 31 30-Nov-2017 2-Dec-2017 2:30 PM 3-Dec-2017 A Approved Closed
111A-L27 and MH-94-L25 and MH-60-L13 and MH-15-L04 and MH- & 27
09-L01 and MH-106-L30

Inspection of Reinforcement steel bar Internal shutter for Storm GRP


Manholes (Precast yard) Zone Line 19 & 15
2754 KHEP-CI-2754
1B & 4B, Line 19 & 15 & 27, MH-115-L27 and MH-117-L27 and MH- & 27
Zone 1B & 4B Division 33 30-Nov-2017 2-Dec-2017 1:30 PM 4-Dec-2017 A Approved Closed
66-L19 and MH-57-L15 and MH-58-L15 and MH-65-L19

First Coat, Bituminous Damproofing installation inspection for Sewer


manholes base (Precast yard)
Line 27 & 28
2755 KHEP-CI-2755 Zone 2B, Line 27 & 28 & 29 & 30, MH-2-L27 and MH-1-L27 and
& 29 & 30
Zone 2B Division 33 30-Nov-2017 2-Dec-2017 10:00 AM 3-Dec-2017 A Approved Closed
MH-1-L28 and MH-1A-L28 and MH-3-L30 and MH-2-L30 and MH-1-
L29 and MH-1A-L29 and MH-1-L30 and MH-1A-L30
Installation of reinforced steel bar, embedded item & form closure
2756 KHEP-CI-2756 inspection for RC Column First Floor Cluster 20 B2 NA Division 03 30-Nov-2017 2-Dec-2017 2:00 PM 3-Dec-2017 B Approved Closed
Cluster 20, B2
Concrete sampling, testing and placement inspection for RC Column
Cluster 49,
2757 KHEP-CI-2757 Neck Cluster
BC6
NA Division 03 30-Nov-2017 2-Dec-2017 9:30 AM 3-Dec-2017 A Approved Closed
49, BC6
Concrete sampling, testing and placement inspection for RC Column
Cluster 70,
2758 KHEP-CI-2758 Neck Cluster
BC4
NA Division 03 30-Nov-2017 2-Dec-2017 9:30 AM 3-Dec-2017 A Approved Closed
70, BC4
Concrete sampling, testing and placement inspection for RC Column
2759 KHEP-CI-2759 First Floor Cluster 61, B2 NA Division 03 30-Nov-2017 2-Dec-2017 9:30 AM 3-Dec-2017 A Approved Closed
Cluster 61, B2
Concrete sampling, testing and placement inspection for RC Column
2760 KHEP-CI-2760 Ground Floor Cluster 63, B2 NA Division 03 30-Nov-2017 2-Dec-2017 9:30 AM 3-Dec-2017 A Approved Closed
Cluster 63, B2
Inspection of excavated and Compaction formation for Pipe Trench
Storm main Line Dia 500mm & 400mm
2761 KHEP-CI-2761
Zone 3B, Line 39 & 20, MH-136-L39 to MH-71-L20
Line 39 & 20 Zone 3B Division 31 30-Nov-2017 2-Dec-2017 11:30 AM 3-Dec-2017 B Approved Closed
and MH-71-L20 to MH-70-L20 and MH-70-L20 to MH-69-L20
Inspection of excavated formation for Pipe Trench Sewer main Line
2762 KHEP-CI-2762 Dia 200mm Zone 1B, Line 2 Zone 1B Division 31 30-Nov-2017 2-Dec-2017 11:30 AM 3-Dec-2017 B Approved Closed
Line 2, MH-2-L02 to MH-2A-L02 and MH-2A-L02 to MH-1-L02

Inspection of Gravel bedding Installation under pipe trench geotextile


2763 KHEP-CI-2763 protection sheet sewer main line Dia 200mm Line 2 Zone 1B Division 31 30-Nov-2017 2-Dec-2017 11:00 AM 3-Dec-2017 B Approved Closed
Zone 1B, Line 2, MH-4-L02 and MH-3-L02
Inspection of Gravel bedding Installation under S.Sewer Manhole
base with geotextile protection sheet sewer main line
2764 KHEP-CI-2764
Zone 1B, Line 2, MH-5-L02 and MH-5A-L02
Line 2 Zone 1B Division 31 30-Nov-2017 2-Dec-2017 1:30 PM 3-Dec-2017 A Approved Closed
and MH-4-L02 and MH-3-L02
Inspection Formwork and concrete pouring for sewer embedded pice
at manhole Zone 1B Line 1,2 MH-5-L02 and MH-
2960.2 KHEP-CI- 2959-02
3-L02 one side MH-5-A-L02 and MH-4-L02 and MH-7-L01 two side
Line 1,2 Zone 1B Division 31 2-Jan-2018 3-Jan-2018 2:30 AM 4-Jan-2018 A Approved Closed
MH-8-L01 and MH-6-L01
Inspection From work and concrete pouring for Sewer back Drop
2765 KHEP-CI-2765 pice (From IC to MH 160mm) at Manhole Zone 1B, Line 33 & 34, Line 33 & 34 Zone 1B Division 31 2-Jan-2018 3-Jan-2018 2:30 PM 6-Jan-2018 E Rejected Closed
MH-1-A-L33 and MH-1-A-L34
Inspection From work and concrete pouring for Sewer back Drop
2765.1 KHEP-CI-2765-01 pice (From IC to MH 160mm) at Manhole Zone 1B, Line 33 & 34, Line 33 & 34 Zone 1B Division 31 7-Jan-2018 8-Jan-2018 2:30 PM 10-Jan-2018 E Rejected Closed
MH-1-A-L33 and MH-1-A-L34
Inspection of excavated and Compaction formation for Storm
Manholes storm main line
2766 KHEP-CI-2766
Zone 3B, Line 39 & 20, MH-136-L39 to MH-71-L20 and MH-70-L20
Line 39 & 20 Zone 3B Division 31 30-Nov-2017 2-Dec-2017 1:30 PM 3-Dec-2017 A Approved Closed
to MH-69-L20
Inspection From work and pouring concrete Encasement of Sewer
pipe (Crosing with potable water pipe line) at Manhole 9Alley 1 & 2)
2767 KHEP-CI-2767
Zone 1B, Line 3 &
Line 3 & 8 Zone 1B Division 31 3-Dec-2017 4-Dec-2017 10:30 AM 6-Dec-2017 A Approved Closed
8, MH-1-L03 and MH-3-L08
Cast in place concrete form work inspection for RC Column First Floor
2768 KHEP-CI-2768 Cluster 48, Cluster 48, B2 NA Division 03 30-Nov-2017 2-Dec-2017 9:30 AM 3-Dec-2017 A Approved Closed
B2
Cast in place concrete form work inspection for Grade beam Cluster 18
2769 KHEP-CI-2769
Cluster 18, BC4 BC4
NA Division 03 2-Dec-2017 3-Dec-2017 10:00 AM 5-Dec-2017 A Approved Closed

Installation of reinforced steel bar, embedded item & form closure


Cluster 18
2770 KHEP-CI-2770 inspection for RC Grade Beam
BC4
NA Division 03 2-Dec-2017 3-Dec-2017 10:00 AM 5-Dec-2017 A Approved Closed
Cluster 18, BC4
Cast in place concrete form work inspection for First Floor slab &
2771 KHEP-CI-2771 Stair Cluster 27, Cluster 27, B2 NA Division 03 2-Dec-2017 3-Dec-2017 2:00 PM 5-Dec-2017 A Approved Closed
B2
Installation of reinforced steel bar, embedded item & form closure
2772 KHEP-CI-2772 inspection for RC First Floor slab & Stair Cluster 27, B2 NA Division 03 2-Dec-2017 3-Dec-2017 2:00 PM 5-Dec-2017 A Approved Closed
Cluster 27, B2
Cast in place concrete form work inspection for Column Ground floor
Cluster 43,
2773 KHEP-CI-2773 axis (H,J,K,L,M,N)
A6
NA Division 03 2-Dec-2017 3-Dec-2017 2:00 PM 4-Dec-2017 A Approved Closed
Cluster 43, A6
Box closing & Grouting for storm embedded pice at manhole
Zone 2B, Line 4 & 5 & 3, MH- Line 4 & 5 &
2774 KHEP-CI-2774
I12-L04 (two side), MH-I11-L05 (one sides) and MH-I7-L03 (one 3
Zone 2B Division 33 2-Dec-2017 3-Dec-2017 10:30 AM 6-Dec-2017 A Approved Closed
side)
Inspection of excavated formation for Sewer main line 200mm
Approved w/
2775 KHEP-CI-2775 Zone 1B, Line 2, MH-1-L02 to Line 2 Zone 1B Division 33 2-Dec-2017 3-Dec-2017 11:30 AM 6-Dec-2017 B comments
Closed
MH-4-L01
Inspection of gravel filling around pipe Sewer main line 200mm
Approved w/
2776 KHEP-CI-2776 Zone 1B, Line 1, MH-8-L01 Line 1 Zone 1B Division 31 2-Dec-2017 3-Dec-2017 11:00 AM 6-Dec-2017 B comments
Closed
to MH-7-L01 and MH-7-L01 to MH-6-L01
Inspection of Reinforcement steel bar Internal shutter for Storm
2777 KHEP-CI-2777 Catch Basin (Precast yard) Line 8 Zone 1B & 4B Division 33 2-Dec-2017 3-Dec-2017 1:30 PM 5-Dec-2017 A Approved Closed
Zone 1B & 4B, Line 8, CB-125 at MH-26-L08

Cast in place concrete form work inspection for Column First Floor
2778 KHEP-CI-2778
Cluster 20, B2
Cluster 20 B2 NA Division 03 2-Dec-2017 3-Dec-2017 2:00 PM 4-Dec-2017 A Approved Closed

Concrete sampling, testing and placement inspection for RC Grade


Cluster 21, Approved w/
2779 KHEP-CI-2779 Beam Cluster
BC4
NA Division 03 3-Dec-2017 4-Dec-2017 9:00 AM 5-Dec-2017 B comments
Closed
21, BC4
Concrete sampling, testing and placement inspection for RC First
Cluster 16
2780 KHEP-CI-2780 Floor Slab & Stair
BC4
NA Division 03 3-Dec-2017 4-Dec-2017 9:00 AM 5-Dec-2017 A Approved Closed
Cluster 16, BC4
Compaction test of Sand bedding for pipe trench Dia 400mm &
500mm Storm Maine Line
2781 KHEP-CI-2781
Zone 3B, Line 39 & 20, MH-136-L39 to MH-71-L20 and MH-71-L20
Line 39 & 20 Zone 3B Division 31 3-Dec-2017 4-Dec-2017 1:30 PM 6-Dec-2017 A Approved Closed
to MH-70-L20 and MH-70-L20 to MH-69-L20
Concrete sampling, testing and placement inspection for RC Column
2782 KHEP-CI-2782 Ground Floor Cluster 72, B2 NA Division 03 3-Dec-2017 4-Dec-2017 9:30 AM 5-Dec-2017 A Approved Closed
Cluster 72, B2
Concrete sampling, testing and placement inspection for RC First
2783 KHEP-CI-2783 Floor slab & Second Flight Stair Cluster 71, B2 NA Division 03 3-Dec-2017 4-Dec-2017 9:30 AM 5-Dec-2017 A Approved Closed
Cluster 71, B2

First Coat dam proofing installation inspection for CMU, Morter and
Cluster 56,
2784 KHEP-CI-2784 Masonry inspection under exterior reinforced grade beam
BC4
NA Division 07 3-Dec-2017 4-Dec-2017 2:00 PM 5-Dec-2017 A Approved Closed
Cluster 56, BC4

Cast in place concrete form work inspection for First Floor Slab &
2785 KHEP-CI-2785 Stair Second Flight Cluster 51, B2 NA Division 03 3-Dec-2017 4-Dec-2017 10:00 AM 5-Dec-2017 A Approved Closed
Cluster 51, B2
Installation of reinforced steel bar, embedded item & form closure
2786 KHEP-CI-2786 inspection for RC First Floor Slab 7 Stair Second Flight Cluster 51, B2 NA Division 03 3-Dec-2017 4-Dec-2017 10:30 AM 5-Dec-2017 A Approved Closed
Cluster 51, B2

Cast in place concrete form work inspection for Rc Column Neck Cluster 47,
2787 KHEP-CI-2787
Cluster 47, BC6 BC6
NA Division 03 3-Dec-2017 4-Dec-2017 2:00 PM 5-Dec-2017 A Approved Closed

Compaction test final layer general fill (Around Footing) Cluster 37,
2788 KHEP-CI-2788
Zone 2B, Cluster 37, BC4 BC4
Zone 2B Division 31 4-Dec-2017 5-Dec-2017 1:30 PM 6-Dec-2017 A Approved Closed

Inspection Formwork and concrete pouring for sewer Back Drop pice
2765.2 KHEP-CI-2765-02 ( From IC to MH Ø 160 mm ) at Manhole Zone 1B Line 33 , 34 MH-1- Line 33 & 34 Zone 1B Division 31 11-Jan-2018 13-Jan-2018 2:30 PM 14-Jan-2018 A Approved Closed
A-L33 & MH-1-A-L34
Inspection From work and pouring of concrete Sewer Backdrop
2789 KHEP-CI-2789 connecting to sewer manholes Zone 1B, Line 2, MH-9-L02 and MH- Line 2 Zone 1B Division 31 17-Jan-2018 18-Jan-2018 1:30 PM 20-Jan-2018 E Rejected Closed
8-L02 and MH-7-L02
Inspection From work and pouring for storm pice at manhole
2790 KHEP-CI-2790 Zone 2B, Line 8 & 9, MH- Zone 2B Line 8 & 9 Division 33 7-Dec-2017 9-Dec-2017 11:00 AM 9-Dec-2017 A Approved Closed
26-L08 (one side) and MH-I25-L09 (two side)
Inspection for Application of Second Coating Bituminous Dam
proofing for Storm manholes (Pre cast yard)
2791 KHEP-CI-2791 Zone 1B, Line 15, MH-47-L15 and MH-48- Line 15 Zone 1B Division 33 4-Dec-2017 5-Dec-2017 1:30 PM 6-Dec-2017 A Approved Closed
L15 and MH-49-L15 and MH-50-L15 and MH-51-L15 and MH-52-
L15
Concrete sampling, testing and placement inspection for RC Footing Cluster 62,
2792 KHEP-CI-2792
Cluster 62, BC6 BC6
NA Division 03 4-Dec-2017 5-Dec-2017 9:30 AM 6-Dec-2017 A Approved Closed

Second coat damproofing installation inspection for CMU, Morter and


Cluster 56,
2793 KHEP-CI-2793 Masonry inspection under exterior reinforced grade beam
BC4
NA Division 07 4-Dec-2017 5-Dec-2017 2:00 PM 6-Dec-2017 A Approved Closed
Cluster 56, BC4

First Coat, Damproofing installation Inspection for RC Footing &


Cluster 39,
2794 KHEP-CI-2794 Column Neck
BC6
NA Division 07 4-Dec-2017 5-Dec-2017 10:00 AM 6-Dec-2017 A Approved Closed
Cluster 39, BC6

Inspection of Concrete pouring for Sewer GRP Manholes (Precast


yard) Zone 2B & 3B
Zone 2B & 3B
2795 KHEP-CI-2795 & 4B, Line 2, MH-10-L02 and MH-12-L02 and MH-19-L02 and MH- Line 2
& 4B
Division 33 5-Dec-2017 6-Dec-2017 1:30 PM 7-Dec-2017 A Approved Closed
20-L02 and MH-13-L02 and MH-21-L02 and MH-22-L02 and MH-11-
L02 and MH-18-L02 and MH-15-L02 and MH-17-L02 and MH-14-L02

Second Coat, Bituminous Damproofing installation inspection for


Sewer manholes base (Precast yard)
Line 27 & 28
2796 KHEP-CI-2796 Zone 2B, Line 27 & 28 & 29 & 30, MH-2-L27 and MH-1-L27
& 29 & 30
Zone 2B Division 33 5-Dec-2017 6-Dec-2017 11:00 AM 7-Dec-2017 A Approved Closed
and MH-1-L28 and MH-1A-L28 and MH-3-L30 and MH-2-L30 and
MH-1-L29 and MH-1A-L29 and MH-1-L30 and MH-1A-L30
Inspection Form work for base & wall and concrete Pouring for Storm
Manholes (Precast yard)
Line 19 & 15
2797 KHEP-CI-2797 Zone 1B & 4B, Line 19 & 15 & 27, MH-115-L27 and MH-
& 27
Zone 1B & 4B Division 33 5-Dec-2017 6-Dec-2017 2:30 PM 9-Dec-2017 A Approved Closed
117-L27 and MH-66-L19 and MH-57-L15 and MH-58-L15 and MH-65-
L19
Inspection of Reinforcement steel bar Internal shutter for Storm
Manholes (Precast yard) Zone Line 4 & 29 & Approved w/
2798 KHEP-CI-2798
1B & 4B, Line 4 & 29 & 32, MH-I13-L04 and MH-I103-L29 and MH- 32
Zone 1B & 4B Division 33 5-Dec-2017 6-Dec-2017 11:00 AM 7-Dec-2017 B comments
Closed
112-L32
Concrete sampling, testing and placement inspection for RC Column
2799 KHEP-CI-2799 (First Floor) Cluster 3, A6 NA Division 03 5-Dec-2017 6-Dec-2017 9:00 AM 7-Dec-2017 A Approved Closed
Cluster 3, A6
Concrete sampling, testing and placement inspection for RC Column
2800 KHEP-CI-2800 (First Floor) Cluster 20 B2 NA Division 03 5-Dec-2017 6-Dec-2017 9:00 AM 7-Dec-2017 A Approved Closed
Cluster 20, B2
Installation of reinforced steel bar, embedded item & form closure
Cluster 21,
2801 KHEP-CI-2801 inspection for RC Column (Ground Floor)
BC4
NA Division 03 5-Dec-2017 6-Dec-2017 10:00 AM 7-Dec-2017 A Approved Closed
Cluster 21, BC4
Installation of reinforced steel bar, embedded item & form closure
Cluster 16
2802 KHEP-CI-2802 inspection for RC Column (First Floor)
BC4
NA Division 03 5-Dec-2017 6-Dec-2017 10:00 AM 7-Dec-2017 A Approved Closed
Cluster 16, BC4
Check the survey work, elevation and coordinate for blinding under
Cluster 22,
2803 KHEP-CI-2803 Grade Beam
BC4
NA Division 03 5-Dec-2017 6-Dec-2017 2:00 PM 7-Dec-2017 A Approved Closed
Cluster 22, BC4
Termite control surface preparation,installation and final inspection
Approved w/
2804 KHEP-CI-2804 for Slab on grade axis (A-G) Cluster 01 A6 NA Division 03 5-Dec-2017 6-Dec-2017 2:00 PM 7-Dec-2017 B comments
Closed
Cluster 1, A6
Cast in place concrete form work inspection for Rc First Floor Slab &
Approved w/
2805 KHEP-CI-2805 Stair Cluster Cluster 4, A6 NA Division 03 5-Dec-2017 6-Dec-2017 10:00 AM 9-Dec-2017 B comments
Closed
4, A6
Installation of reinforced steel bar, embedded item & form closure
2806 KHEP-CI-2806 inspection for RC First Floor Slab & Stair Cluster 4, A6 NA Division 03 5-Dec-2017 6-Dec-2017 10:00 AM 9-Dec-2017 A Approved Closed
Cluster 4, A6

Cast in place concrete form work inspection for Rc Slab on Grade


2807 KHEP-CI-2807
Cluster 15, B2
Cluster 15 B2 NA Division 03 5-Dec-2017 6-Dec-2017 10:00 AM 9-Dec-2017 A Approved Closed

Installation of wire mesh, embedded item & form closure inspection


2808 KHEP-CI-2808 for RC Slab on Grade Cluster 15 B2 NA Division 03 5-Dec-2017 6-Dec-2017 10:00 AM 9-Dec-2017 A Approved Closed
Cluster 15, B2

Cast in place concrete form work inspection for Rc Grade Beam


2809 KHEP-CI-2809
Cluster 30, B2
Cluster 30, B2 NA Division 03 5-Dec-2017 6-Dec-2017 10:00 AM 9-Dec-2017 A Approved Closed

Installation of reinforced steel bar, embedded item & form closure


2810 KHEP-CI-2810 inspection for RC Grade Beam Cluster 30, B2 NA Division 03 5-Dec-2017 6-Dec-2017 10:00 AM 9-Dec-2017 A Approved Closed
Cluster 30, B2

Cast in place concrete form work inspection for Rc Column Neck Cluster 38,
2811 KHEP-CI-2811
Cluster 38, BC6 BC6
NA Division 03 5-Dec-2017 6-Dec-2017 10:00 AM 7-Dec-2017 A Approved Closed

Second Coat, Damproofing installation Inspection for RC Footing &


Cluster 39,
2812 KHEP-CI-2812 Column Neck
BC6
NA Division 07 5-Dec-2017 6-Dec-2017 10:00 AM 7-Dec-2017 A Approved Closed
Cluster 39, BC6
Blinding concrete sapmling Testing & Placement inspection for
manhloe - Storm Main line
2813 KHEP-CI-2813
Zone 3B, Line 39 & 20, MH-136-L39 and MH-71-L20 and MH-70-L20
Line 39 & 20 Zone 3B Division 31 5-Dec-2017 6-Dec-2017 1:30 PM 7-Dec-2017 A Approved Closed
and MH-69-L20
Inspection Form work for base & wall and concrete Pouring for Storm
2814 KHEP-CI-2814 Catch Basin (Precast yard) Line 8 Zone 1B & 4B Division 33 5-Dec-2017 6-Dec-2017 11:00 AM 9-Dec-2017 A Approved Closed
Zone 1B & 4B, Line 8, CB-125 at MH-26-L08
First Coat, Damproofing installation Inspection for RC Footing &
Cluster 74,
2815 KHEP-CI-2815 Column Neck
BC4
NA Division 03 5-Dec-2017 6-Dec-2017 2:00 PM 7-Dec-2017 A Approved Closed
Cluster 74, BC4
Installation of reinforced steel bar, embedded item & form closure
2816 KHEP-CI-2816 inspection for RC Column First Floor Cluster 71, B2 NA Division 03 5-Dec-2017 6-Dec-2017 2:30 PM 7-Dec-2017 A Approved Closed
Cluster 71, B2
Second Coat, Damproofing installation Inspection for RC Footing &
Cluster 74,
2817 KHEP-CI-2817 Column Neck
BC4
NA Division 03 6-Dec-2017 7-Dec-2017 9:45 AM 9-Dec-2017 A Approved Closed
Cluster 74, BC4
Concrete sampling, testing and placement inspection for RC Column
2818 KHEP-CI-2818 First Floor Cluster 48, B2 NA Division 03 6-Dec-2017 7-Dec-2017 9:30 AM 9-Dec-2017 A Approved Closed
Cluster 48, B2
Inspection From work and pouring for storm embedded pice at
Manhole
Line 7 & 9 &
2819 KHEP-CI-2819 Zone 2B, Line 7 & 9 & 3 & 4 & 5, MH-I24-L09 (two side) and MH-I7-
3&4&5
Zone 2B Division 33 6-Dec-2017 7-Dec-2017 11:00 AM 9-Dec-2017 A Approved Closed
L03 (two side) and MH-27-L07 (two side) and MH-I12-L04 (Three
side) and MH-28-L07 (two side) and MH-I11-L05 (one side)

Inspection of excavated and Compaction formation for Storm


Approved w/
2820 KHEP-CI-2820 Manholes storm main Line Line 20 Zone 3B Division 31 6-Dec-2017 7-Dec-2017 11:30 AM 9-Dec-2017 B comments
Closed
Zone 3B, Line 20, MH-68-L20
Inspection of excavated and Compaction formation for Pipe Trench
2821 KHEP-CI-2821 Storm main Line Dia 500mm Line 20 Zone 3B Division 31 6-Dec-2017 7-Dec-2017 11:00 AM 9-Dec-2017 A Approved Closed
Zone 3B, Line 20, MH-69-L20 to MH-68-L20
Compaction test Around Footing General Fill (Final Layer)
Cluster 55,
2822 KHEP-CI-2822 Zone 3B, Cluster
BC4
Zone 3B Division 31 6-Dec-2017 7-Dec-2017 2:00 PM 9-Dec-2017 A Approved Closed
55, BC4
Compaction test first and final layer structural Fill (Selected fill)
Cluster 53,
2823 KHEP-CI-2823 Zone 3B,
BC6
Zone 3B Division 31 6-Dec-2017 7-Dec-2017 2:30 PM 11-Dec-2017 A Approved Closed
Cluster 53, BC6
Installation for Sewer GRP Manholes Sewer main line
2824 KHEP-CI-2824 Zone 1B, Line 2, MH-5-L02 and MH- Line 2 Zone 1B Division 31 6-Dec-2017 7-Dec-2017 10:30 AM 9-Dec-2017 A Approved Closed
5A-L02 and MH-4-L02 and MH-3-L02

Cast in place concrete form work inspection for Rc Grade Beam Cluster 65,
2825 KHEP-CI-2825
Cluster 65, A6 A6
NA Division 03 6-Dec-2017 7-Dec-2017 10:00 AM 9-Dec-2017 A Approved Closed

Installation of reinforced steel bar, embedded item & form closure


Cluster 65,
2826 KHEP-CI-2826 inspection for RC Grade Beam
A6
NA Division 03 6-Dec-2017 7-Dec-2017 10:30 AM 9-Dec-2017 A Approved Closed
Cluster 65, A6
Concrete sampling, testing and placement inspection for RC Grade
Cluster 18 Approved w/
2827 KHEP-CI-2827 Beam Cluster
BC4
NA Division 03 6-Dec-2017 7-Dec-2017 9:00 AM 9-Dec-2017 B comments
Closed
18, BC4
Termite control surface preparation,installation and final inspection
Cluster 22,
2828 KHEP-CI-2828 for Grade Beam
BC4
NA Division 03 7-Dec-2017 9-Dec-2017 9:00 AM 11-Dec-2017 A Approved Closed
Cluster 22, BC4
Blinding Concrete sampling, testing and placement inspection for RC
Cluster 22,
2829 KHEP-CI-2829 Grade Beam
BC4
NA Division 03 7-Dec-2017 9-Dec-2017 9:00 AM 9-Dec-2017 A Approved Closed
Cluster 22, BC4
installation of reinforcing steel bar ,embedded item and form closure
Cluster 18
2830 KHEP-CI-2830 inspection for RC column (ground floor)
BC4
NA Division 03 7-Dec-2017 9-Dec-2017 10:00 AM 11-Dec-2017 A Approved Closed
Cluster 18, BC4
installation of reinforcing steel bar ,embedded item and form closure
Cluster 6,
2831 KHEP-CI-2831 inspection for RC column (first floor)
BC4
NA Division 03 7-Dec-2017 9-Dec-2017 1:30 PM 9-Dec-2017 A Approved Closed
Cluster 6, BC4
Cast in place concrete form work inspection for Rc Column Ground
Cluster 21,
2832 KHEP-CI-2832 Floor
BC4
NA Division 03 7-Dec-2017 9-Dec-2017 10:00 AM 9-Dec-2017 A Approved Closed
Cluster 21, BC4
Concrete sampling, testing and placement inspection for RC First
Cluster 6,
2833 KHEP-CI-2833 Floor slab & stair
BC4
NA Division 03 7-Dec-2017 9-Dec-2017 9:00 AM 9-Dec-2017 A Approved Closed
Cluster 6, BC4
Cast in place concrete form work inspection for Rc Roof slab Approved w/
2834 KHEP-CI-2834
Cluster 8, B2
Cluster 8, B2 NA Division 03 7-Dec-2017 9-Dec-2017 10:00 AM 11-Dec-2017 B comments
Closed

installation of reinforcing steel bar ,embedded item and form closure


2835 KHEP-CI-2835
inspection for RC Roof slab Cluster 8, B2
Cluster 8, B2 NA Division 03 7-Dec-2017 9-Dec-2017 10:00 AM 9-Dec-2017 A Approved Closed

70cm, CMU motor and masonry inspection under exterior reinforced


Cluster 41,
2836 KHEP-CI-2836 grade beam Cluster 41,
BC4
NA Division 04 7-Dec-2017 9-Dec-2017 2:00 PM 11-Dec-2017 A Approved Closed
BC4
Inspection From work and concrete pouring for Sewer embedded
2837 KHEP-CI-2837 pice at Manhole Zone 1B, Line 2, MH-9-L02 Two side and MH-7-L02 Line 2 Zone 1B Division 31 26-Dec-2017 27-Dec-2017 2:30 PM 28-Dec-2017 A Approved Closed
two side
Inspection Form work for base & wall and concrete Pouring for Storm
Manhole (Precast yard) Line 4 & 29 &
2838 KHEP-CI-2838
Zone 1B & 4B, Line 4 & 29 & 32, MH-I13-L04 and MH-I103- 32
Zone 1B & 4B Division 33 7-Dec-2017 9-Dec-2017 11:30 AM 11-Dec-2017 E Rejected Closed
L29 and MH-I112-L32
Inspection Form work for base & wall and concrete Pouring for Storm
Manhole (Precast yard) Line 4 & 29 &
2838.1 KHEP-CI-2838-01
Zone 1B & 4B, Line 4 & 29 & 32, MH-I13-L04 and MH-I103- 32
Zone 1B & 4B Division 33 17-Dec-2017 18-Dec-2017 10:30 AM 18-Dec-2017 A Approved Closed
L29 and MH-I112-L32
Concrete sampling, testing and placement inspection for RC Column
Cluster 47,
2839 KHEP-CI-2839 Neck Cluster
BC6
NA Division 03 7-Dec-2017 9-Dec-2017 9:30 AM 9-Dec-2017 A Approved Closed
47, BC6
Cast in place concrete form work inspection for First Floor Slab &
2840 KHEP-CI-2840 Second Flight Stair Cluster 73, B2 NA Division 03 7-Dec-2017 9-Dec-2017 10:00 AM 11-Dec-2017 A Approved Closed
Cluster 73, B2

installation of reinforcing steel bar ,embedded item and form closure


2841 KHEP-CI-2841 inspection for RC First Floor Slab & Second Flight Stair Cluster 73, B2 NA Division 03 7-Dec-2017 9-Dec-2017 10:30 AM 11-Dec-2017 A Approved Closed
Cluster 73, B2

Cast in place concrete form work inspection for First Floor Slab &
2842 KHEP-CI-2842 Second Flight Stair Cluster 52, B2 NA Division 03 7-Dec-2017 9-Dec-2017 11:00 AM 11-Dec-2017 A Approved Closed
Cluster 52, B2

installation of reinforcing steel bar ,embedded item and form closure


2843 KHEP-CI-2843 inspection for RC First Floor Slab & Second Flight Stair Cluster 52, B2 NA Division 03 7-Dec-2017 9-Dec-2017 11:30 AM 11-Dec-2017 A Approved Closed
Cluster 52, B2

Concrete sampling, testing and placement inspection for RC Grade


Approved w/
2844 KHEP-CI-2844 Beam Cluster Cluster 30, B2 NA Division 03 9-Dec-2017 10-Dec-2017 9:00 AM 11-Dec-2017 B comments
Closed
30, B2
Concrete sampling, testing and placement inspection for RC First
Approved w/
2845 KHEP-CI-2845 Floor Slab & Stair Cluster 27, B2 NA Division 03 9-Dec-2017 10-Dec-2017 9:00 AM 11-Dec-2017 B comments
Closed
Cluster 27, B2
Concrete sampling, testing and placement inspection for RC Slab on
2846 KHEP-CI-2846 Grade Cluster Cluster 15 B2 NA Division 03 9-Dec-2017 10-Dec-2017 9:00 AM 11-Dec-2017 A Approved Closed
15, B2
installation of reinforcing steel bar ,embedded item and form closure
2847 KHEP-CI-2847 inspection for RC Column First Floor Cluster 27, B2 NA Division 03 9-Dec-2017 10-Dec-2017 10:30 AM 11-Dec-2017 A Approved Closed
Cluster 27, B2
Compaction test of Sand Filling Above the pipe trench and laying
Warning tape Sewer main Line Dia 200mm
2848 KHEP-CI-2848
Zone 1B, Line 2, MH-9-L02 to MH-8-L02 and MH-8-
Line 2 Zone 1B Division 31 9-Dec-2017 10-Dec-2017 10:30 AM 11-Dec-2017 A Approved Closed
L02 to MH-7-L02
Damproofing surface preparation for RC Foundation & Column Neck
Cluster 70,
2849 KHEP-CI-2849 Cluster
BC4
NA Division 03 9-Dec-2017 10-Dec-2017 2:30 PM 11-Dec-2017 A Approved Closed
70, BC4
Concrete sampling, testing and placement inspection for RC Column
Cluster 38,
2850 KHEP-CI-2850 Neck Cluster 38,
BC6
NA Division 03 10-Dec-2017 11-Dec-2017 9:00 AM 11-Dec-2017 A Approved Closed
BC6

Cast in place concrete form work inspection for Rc Grade Beam Cluster 23,
2851 KHEP-CI-2851
Cluster 23, BC4 BC4
NA Division 03 10-Dec-2017 11-Dec-2017 2:00 PM 12-Dec-2017 A Approved Closed

installation of reinforcing steel bar ,embedded item and form closure


Cluster 23,
2852 KHEP-CI-2852 inspection for RC Grade Beam
BC4
NA Division 03 10-Dec-2017 11-Dec-2017 2:30 PM 12-Dec-2017 A Approved Closed
Cluster 23, BC4
Cast in place concrete form work inspection for Rc First Floor Slab &
2853 KHEP-CI-2853 Stair Cluster 33, B2 NA Division 03 10-Dec-2017 11-Dec-2017 10:00 AM 12-Dec-2017 A Approved Closed
Cluster 33, B2
installation of reinforcing steel bar ,embedded item and form closure
2854 KHEP-CI-2854 inspection for RC First Floor Slab & Stair Cluster 33, B2 NA Division 03 10-Dec-2017 11-Dec-2017 10:30 AM 12-Dec-2017 A Approved Closed
Cluster 33, B2
Cast in place concrete form work inspection for Rc Stair Second
2855 KHEP-CI-2855 Flight Cluster 4, A6 NA Division 03 10-Dec-2017 11-Dec-2017 10:00 AM 13-Dec-2017 E Rejected Closed
Cluster 4, A6
Cast in place concrete form work inspection for Rc Stair
2855.1 KHEP-CI-2855-01
Cluster 4, A6
Cluster 4, A6 NA Division 03 14-Dec-2017 16-Dec-2017 10:00 AM 19-Dec-2017 A Approved Closed

installation of reinforcing steel bar ,embedded item and form closure


2856 KHEP-CI-2856 inspection for RC Column Ground Floor Cluster 30, B2 NA Division 03 10-Dec-2017 11-Dec-2017 2:00 PM 12-Dec-2017 A Approved Closed
Cluster 30, B2
Check the survey work, elevation and coordinate for blinding under
Cluster 37,
2857 KHEP-CI-2857 Grade Beam
BC4
NA Division 04 10-Dec-2017 11-Dec-2017 2:00 PM 12-Dec-2017 A Approved Closed
Cluster 37, BC4
Cast in place concrete form work inspection for Rc Column Ground
2858 KHEP-CI-2858 Floor Cluster 64, B2 NA Division 03 10-Dec-2017 11-Dec-2017 10:30 AM 11-Dec-2017 A Approved Closed
Cluster 64, B2
Check the survey work, elevation and coordinate for blinding under
Cluster 53,
2859 KHEP-CI-2859 Footing
BC6
NA Division 01 10-Dec-2017 11-Dec-2017 9:30 AM 12-Dec-2017 A Approved Closed
Cluster 53, BC6
Check the survey work, elevation and coordinate for blinding under
Cluster 55,
2860 KHEP-CI-2860 Grade Beam
BC4
NA Division 01 10-Dec-2017 11-Dec-2017 10:00 AM 12-Dec-2017 A Approved Closed
Cluster 55, BC4
Cast in place concrete form work inspection for RC Stair First Flight
2861 KHEP-CI-2861 Ground Floor Cluster 63, B2 NA Division 03 10-Dec-2017 11-Dec-2017 2:00 PM 12-Dec-2017 A Approved Closed
Cluster 63, B2
Installation of reinforced steel bar, embedded item & form closure
2862 KHEP-CI-2862 inspection for RC Stair First Flight Ground Floor Cluster 63, B2 NA Division 03 10-Dec-2017 11-Dec-2017 2:30 PM 12-Dec-2017 A Approved Closed
Cluster 63, B2
Cast in place concrete form work inspection for RC Column - Ground
Cluster 66, Approved w/
2863 KHEP-CI-2863 Floor
A6
NA Division 03 10-Dec-2017 11-Dec-2017 11:00 AM 12-Dec-2017 B comments
Closed
Cluster 66, A6
Inspection of Reinforcement Steel bar and Internal shutter for Storm
Catch Basin (Precast yard) Line 1, 18,
Zone 2B & 3B
2864 KHEP-CI-2864 Zone 2B & 3B & 4B & 5C, Line 1, 18, 19, 21, 26, 33, 34, 19, 21, 26,
& 4B & 5C
Division 33 10-Dec-2017 11-Dec-2017 11:30 AM 12-Dec-2017 A Approved Closed
MH-1-L01 and MH-73-L19 and MH-79-L21 and MH-74-L18 and MH- 33, 34
118-L26 and MH-128-L34 and MH-123-L33
Compaction test of Sand bedding under pipe trench Storm Maine
2865 KHEP-CI-2865 Line Dia 500mm Zone Line 20 Zone 3B Division 31 10-Dec-2017 11-Dec-2017 11:30 AM 12-Dec-2017 A Approved Closed
3B, Line 20, MH-68-L20 to MH-69-L20
Concrete sampling, testing and placement inspection for RC Grade
Cluster 65,
2866 KHEP-CI-2866 Beam
A6
NA Division 03 10-Dec-2017 11-Dec-2017 9:30 AM 11-Dec-2017 A Approved Closed
Cluster 65, A6
Termite control surface preparation,installation and final inspection
2867 KHEP-CI-2867 for Slab on Grade axis (G-N) Cluster 01 A6 NA Division 03 11-Dec-2017 12-Dec-2017 9:00 AM 11-Dec-2017 A Approved Closed
Cluster 1, A6
First coat dam proofing installation inspection for CMU, Morter and
Cluster 42,
2868 KHEP-CI-2868 Masonry inspection under exterior reinforced grade beam
BC4
NA Division 07 11-Dec-2017 12-Dec-2017 10:00 AM 18-Dec-2017 A Approved Closed
Cluster 42, BC4
Cast in place concrete form work inspection for RC Column - Ground
Cluster 43,
2869 KHEP-CI-2869 Floor axis (A,B,C,D,E,F,G)
A6
NA Division 03 11-Dec-2017 12-Dec-2017 11:00 AM 17-Dec-2017 E Rejected Closed
Cluster 43, A6
Cast in place concrete form work inspection for RC Column - Ground
Cluster 43,
2869.1 KHEP-CI-2869-01 Floor axis (A,B,C,D,E,F,G)
A6
NA Division 03 14-Dec-2017 16-Dec-2017 11:00 AM 17-Dec-2017 A Approved Closed
Cluster 43, A6
Inspection From work and concrete pouring for Storm embedded
pice at Manhole Zone 4B, Line 22, Approved w/
2870 KHEP-CI-2870
MH-83-L22 one side and MH-84-L22 two side and MH-87-L22 Three
Line 22 Zone 4B Division 33 11-Dec-2017 12-Dec-2017 2:00 PM 16-Dec-2017 B comments
Closed
side and MH-88-L22 one side
Damproofing surface preparation for RC Foundation & Column Neck
Cluster 47,
2871 KHEP-CI-2871 Cluster NA Division 07 11-Dec-2017 12-Dec-2017 2:30 PM RECALLED
BC6
47, BC6
Installation of reinforcing steel bar embedded item and form closure
2872 KHEP-CI-2872 inspection for RC Column - First Floor Cluster 51, B2 NA Division 03 11-Dec-2017 12-Dec-2017 10:30 AM 16-Dec-2017 A Approved Closed
Cluster 51, B2
Concrete sampling, testing and placement inspection for RC Column -
2873 KHEP-CI-2873 First Floor Cluster 48, B2 NA Division 03 11-Dec-2017 12-Dec-2017 9:30 AM 13-Dec-2017 A Approved Closed
Cluster 48, B2
Cast in place concrete form work inspection for RC Grade Beam
Cluster 60,
2874 KHEP-CI-2874 Cluster 60,
BC4
NA Division 03 11-Dec-2017 12-Dec-2017 10:30 AM 16-Dec-2017 E Rejected Closed
BC4
Cast in place concrete form work inspection for RC Grade Beam
Cluster 60,
2874.1 KHEP-CI-2874-01 Cluster 60,
BC4
NA Division 03 16-Dec-2017 17-Dec-2017 10:30 AM 19-Dec-2017 A Approved Closed
BC4
Installation of reinforcing steel bar embedded item and form closure
Cluster 60,
2875 KHEP-CI-2875 inspection for RC Grade Beam
BC4
NA Division 03 11-Dec-2017 12-Dec-2017 11:00 AM 16-Dec-2017 E Rejected Closed
Cluster 60, BC4
Installation of reinforcing steel bar embedded item and form closure
Cluster 60,
2875.1 KHEP-CI-2875-01 inspection for RC Grade Beam
BC4
NA Division 03 16-Dec-2017 17-Dec-2017 11:00 AM 19-Dec-2017 A Approved Closed
Cluster 60, BC4
Termite control surface preparation,installation and final inspection
Cluster 53,
2876 KHEP-CI-2876 for footing
BC6
NA Division 03 11-Dec-2017 12-Dec-2017 2:00 PM 13-Dec-2017 A Approved Closed
Cluster 53, BC6
Termite control surface preparation,installation and final inspection
Cluster 55,
2877 KHEP-CI-2877 for Grade Beam
BC4
NA Division 03 11-Dec-2017 12-Dec-2017 2:30 PM 13-Dec-2017 A Approved Closed
Cluster 55, BC4
Concrete sampling, testing and placement inspection for RC Column
Cluster 21,
2878 KHEP-CI-2878 Ground Floor
BC4
NA Division 03 12-Dec-2017 13-Dec-2017 9:00 AM 13-Dec-2017 E Rejected Closed
Cluster 21, BC4
Inspection From work and pouring of concrete Sewer Backdrop pice
2789.1 KHEP-CI-2789-01 at manholes Zone 1B, Line 2, MH-9-L02 and MH-8-L02 and MH-7- Line 2 Zone 1B Division 31 23-Jan-2018 24-Jan-2018 1:30 PM 24-Jan-2018 A Approved Closed
L02
Compaction Test First &Final layer Structural Fill (Selected Fill)
Cluster 80,
2879 KHEP-CI-2879
Zone 4B, Cluster 80, BC6 BC6
Zone 4B Division 31 12-Dec-2017 13-Dec-2017 2:30 PM 16-Dec-2017 A Approved Closed

Compaction test Around general fill (Final Layer) Cluster 36,


2880 KHEP-CI-2880
Zone 2B, Cluster 36, BC4 BC4
Zone 2B Division 31 12-Dec-2017 13-Dec-2017 2:00 PM 16-Dec-2017 A Approved Closed

Compaction test Around general fill (Final Layer) Cluster 56,


2881 KHEP-CI-2881
Zone 3B, Cluster 56, BC4 BC4
Zone 3B Division 31 12-Dec-2017 13-Dec-2017 2:30 PM 16-Dec-2017 A Approved Closed

First Coat, Bituminous Damproofing installation inspection for Storm


2882 KHEP-CI-2882 manholes Zone 2B, Line 8 Zone 2B Division 33 12-Dec-2017 13-Dec-2017 11:30 AM 16-Dec-2017 A Approved Closed
Line 8, MH-21-L08 and MH-26-L08 and MH-26A-L08
Inspection of Pre Back Filling for Around Manhole Storm main line
2883 KHEP-CI-2883 Zone 1B, Line 10 Zone 1B Division 31 21-Dec-2017 23-Dec-2017 11:00 AM 24-Dec-2017 A Approved Closed
Line 10, MH-I31-L10
Inspection of Pre Back Filling for Around Manhole Sewer main line
Zone 1B, Line 6 & 7 &
2884 KHEP-CI-2884
Line 6 & 7 & 8, MH-4-L08 and MH-3-L08 and MH-2-L08 and MH-1- 8
Zone 1B Division 31 12-Dec-2017 13-Dec-2017 11:00 AM 16-Dec-2017 A Approved Closed
L08 and MH-1-L07 and MH-1-L06
Inspection of Pre Back Filling for Around Manhole Sewer main line
Zone 1B, Line 6 & 7 & Approved w/
2884.1 KHEP-CI-2884-01
Line 6 & 7 & 8, MH-4-L08 and MH-3-L08 and MH-2-L08 and MH-1- 8
Zone 1B Division 31 17-Dec-2017 18-Dec-2017 11:00 AM 18-Dec-2017 B comments
Closed
L08 and MH-1-L07 and MH-1-L06
Installation Inspection of Precast Storm Drainage Manhole
Zone 2B & 3B, Line 1 & 9 & Approved w/
2885 KHEP-CI-2885
Line 1 & 9 & 20 & 39, MH-I22-L09 and MH-I23-L09 and MH-1-L01 20 & 39
Zone 2B & 3B Division 33 12-Dec-2017 13-Dec-2017 11:00 AM 16-Dec-2017 B comments
Closed
and MH-2-L01 and MH-136-L39 and MH-70-L20 and MH-70-L20
Cast in place concrete form work inspection for RC Slab on Grade
2886 KHEP-CI-2886 axis (A-E) Cluster 01 A6 NA Division 03 12-Dec-2017 13-Dec-2017 10:00 AM 16-Dec-2017 A Approved Closed
Cluster 1, A6
Installation of wire mesh embedded item and form closure inspection
2887 KHEP-CI-2887 for RC Slab on Grade axis (A-E) Cluster 01 A6 NA Division 03 12-Dec-2017 13-Dec-2017 10:00 AM 16-Dec-2017 E Rejected Closed
Cluster 1, A6
Installation of wire mesh embedded item and form closure inspection
2887.1 KHEP-CI-2887-01 for RC Slab on Grade axis (A-E) Cluster 01 A6 NA Division 03 18-Dec-2017 19-Dec-2017 10:00 AM 20-Dec-2017 A Approved Closed
Cluster 1, A6

70cm, CMU motor and masonry inspection under exterior reinforced Cluster 40,
2888 KHEP-CI-2888
grade beam Cluster 40, BC4 BC4
NA Division 04 12-Dec-2017 13-Dec-2017 2:00 PM 16-Dec-2017 A Approved Closed

Second coat dam proofing installation inspection for CMU, Morter and
Cluster 42,
2889 KHEP-CI-2889 Masonry inspection under exterior reinforced grade beam
BC4
NA Division 07 12-Dec-2017 13-Dec-2017 10:00 AM 16-Dec-2017 E Rejected Closed
Cluster 42, BC4

Second coat dam proofing installation inspection for CMU, Morter and
Cluster 42,
2889.1 KHEP-CI-2889-01 Masonry inspection under exterior reinforced grade beam
BC4
NA Division 07 18-Dec-2017 19-Dec-2017 10:00 AM 20-Dec-2017 A Approved Closed
Cluster 42, BC4

Concrete sampling, testing and placement inspection for RC Slab


2890 KHEP-CI-2890 First floor 7 Stair Second Flight Cluster 52, B2 NA Division 03 12-Dec-2017 13-Dec-2017 9:30 AM 16-Dec-2017 E Rejected Closed
Cluster 52, B2
Concrete sampling, testing and placement inspection for RC Slab
2890.1 KHEP-CI-2890-01 First floor & Stair Second Flight Cluster 52, B2 NA Division 03 18-Dec-2017 19-Dec-2017 9:30 AM 20-Dec-2017 A Approved Closed
Cluster 52, B2
Cast in place concrete form work inspection for RC Column First Floor
2891 KHEP-CI-2891 Cluster Cluster 71, B2 NA Division 03 12-Dec-2017 13-Dec-2017 10:30 AM 16-Dec-2017 A Approved Closed
71, B2
Inspection of excavated formation for Pipe Trench Sewer main Line
2892 KHEP-CI-2892 Dia 200mm Zone Line 1 Zone 1B Division 31 13-Dec-2017 14-Dec-2017 11:30 AM 17-Dec-2017 E Rejected Closed
1B, Line 1, MH-6-L01 to MH-5-L01
Inspection of excavated formation for Pipe Trench Sewer main Line
Approved w/
2892.1 KHEP-CI-2892-01 Dia 200mm Zone Line 1 Zone 1B Division 31 20-Dec-2017 21-Dec-2017 11:30 AM 24-Dec-2017 B comments
Closed
1B, Line 1, MH-6-L01 to MH-5-L01
First Coat, Damproofing installation Inspection for RC Footing &
Cluster 70,
2893 KHEP-CI-2893 Column Neck
BC4
NA Division 03 13-Dec-2017 14-Dec-2017 10:30 AM 16-Dec-2017 A Approved Closed
Cluster 70, BC4
Cast in place concrete formwork inspection for First Floor Slab &
Approved w/
2894 KHEP-CI-2894 Stair Second Flight Cluster 58, B2 NA Division 03 13-Dec-2017 14-Dec-2017 9:30 AM 16-Dec-2017 B comments
Closed
Cluster 58, B2

Installation of reinforcing steel bar embedded item and form closure


2895 KHEP-CI-2895 inspection for RC First Floor Slab & Stair Second Flight Cluster 58, B2 NA Division 03 13-Dec-2017 14-Dec-2017 10:00 AM 16-Dec-2017 A Approved Closed
Cluster 58, B2

Cast in place concrete form work inspection for RC Column Ground


2896 KHEP-CI-2896 Floor Cluster 30, B2 NA Division 03 13-Dec-2017 14-Dec-2017 10:00 AM 17-Dec-2017 A Approved Closed
Cluster 30, B2
Damproofing surface preparation for RC Grade Beam (From inside)
2897 KHEP-CI-2897 Cluster Cluster 11 B2 NA Division 07 13-Dec-2017 14-Dec-2017 10:00 AM 16-Dec-2017 A Approved Closed
11, B2
Blinding concrete sampling Testing & Placement for Manhole Storm
2898 KHEP-CI-2898 main line Zone 3B, Line 20 Zone 3B Division 31 14-Dec-2017 16-Dec-2017 11:30 AM 16-Dec-2017 A Approved Closed
Line 20, MH-68-L20
cast in place concrete formwork inspection for RC first floor slab &
Cluster 9,
2899 KHEP-CI-2899 stair
BC4
NA Division 03 14-Dec-2017 16-Dec-2017 2:00 PM 21-Dec-2017 A Approved Closed
Cluster 9, BC4
Installation of reinforcing steel bar embedded item and form closure
Cluster 9,
2900 KHEP-CI-2900 inspection for RC first floor slab & stair
BC4
NA Division 03 14-Dec-2017 16-Dec-2017 2:00 PM 21-Dec-2017 A Approved Closed
Cluster 9, BC4
cast in place concrete formwork inspection for RC Column first floor
Cluster 16
2901 KHEP-CI-2901 Cluster
BC4
NA Division 03 14-Dec-2017 16-Dec-2017 1:30 PM 19-Dec-2017 A Approved Closed
16, BC4
Inspection Form work for base & wall and concrete Pouring for Storm
Manhole (Precast yard) Line 1, 18,
Zone 2B & 3B
2902 KHEP-CI-2902 Zone 2B & 3B & 4B & 5C, Line 1, 18, 19, 21, 26, 33, 34, MH- 19, 21, 26,
& 4B & 5C
Division 33 14-Dec-2017 16-Dec-2017 11:30 AM 17-Dec-2017 A Approved Closed
1-L01 and MH-73-L19 and MH-79-L21 and MH-74-L18 and MH-118- 33, 34
L26 and MH-128-L34 and MH-123-L33
Inspection of Reinforcement Steel bar Form work and Concrete
pouring for Protection slab (21pic) Storm main Line
2903 KHEP-CI-2903
Zone 3B, Line 27, MH-I97-L27
Line 27 Zone 3B Division 33 14-Dec-2017 16-Dec-2017 11:30 AM 17-Dec-2017 E Rejected Closed
and MH-I98-L27
Inspection of Reinforcement Steel bar Form work and Concrete
pouring for Protection slab (21pic) Storm main Line
2903.1 KHEP-CI-2903-01
Zone 3B, Line 27, MH-I97-L27
Line 27 Zone 3B Division 33 21-Dec-2017 23-Dec-2017 11:30 AM 24-Dec-2017 E Rejected Closed
and MH-I98-L27
Concrete sampling, testing and placement inspection for RC Column Cluster 21,
2878.1 KHEP-CI-2878-01
Ground Floor Cluster 21, BC4 BC4
NA Division 03 9-Jan-2018 10-Jan-2018 9:00 AM 11-Jan-2018 A Approved Closed

Second coat, Damp proofing installation inspection for RC Footing &


Cluster 70,
2904 KHEP-CI-2904 Column Neck
BC4
NA Division 03 14-Dec-2017 16-Dec-2017 2:00 PM 17-Dec-2017 A Approved Closed
Cluster 70, BC4

70cm, CMU motor and masonry inspection under exterior reinforced Cluster 77,
2905 KHEP-CI-2905
grade beam Cluster 77, BC4 BC4
NA Division 03 14-Dec-2017 16-Dec-2017 9:30 AM 18-Dec-2018 A Approved Closed

cast in place concrete formwork inspection for RC Column first floor


2906 KHEP-CI-2906 Cluster Cluster 51, B2 NA Division 03 14-Dec-2017 16-Dec-2017 10:00 AM 17-Dec-2017 A Approved Closed
51, B2
cast in place concrete formwork inspection for RC Slab Roof floor
Approved w/
2907 KHEP-CI-2907 Cluster 75, Cluster 75, B2 NA Division 03 14-Dec-2017 16-Dec-2017 10:30 AM 19-Dec-2017 B comments
Closed
B2
Installation of reinforcing steel bar embedded item and form closure
Approved w/
2908 KHEP-CI-2908 inspection for RC Slab Roof floor Cluster 75, B2 NA Division 03 14-Dec-2017 16-Dec-2017 11:00 AM 19-Dec-2017 B comments
Closed
Cluster 75, B2
Concrete sampling, testing and placement inspection for RC Grade
Cluster 23,
2909 KHEP-CI-2909 Beam
BC4
NA Division 03 16-Dec-2017 17-Dec-2017 9:00 AM 20-Dec-2017 E Rejected Closed
Cluster 23, BC4
Inspection of Reinforcement Steel bar Form work and Concrete
2904.1 KHEP-CI-2903-02 pouring for Protection slab (21pic) Storm main Line Precast yard Line 27 Zone 3B Division 33 1-Jan-2018 2-Jan-2018 11:30 AM 3-Jan-2018 A Approved Closed
Zone 3B, Line 27, MH-I97-L27 and MH-I98-L27
Concrete sampling, testing and placement inspection for RC Roof
2910 KHEP-CI-2910 Slab Cluster 8, B2 NA Division 03 16-Dec-2017 17-Dec-2017 9:00 AM 20-Dec-2017 E Rejected Closed
Cluster 8, B2
Concrete Sampling ,Testing & Placement Inspection for RC Roof Slab
2910.1 KHEP-CI-2910-01
Cluster 8, B2
Cluster 8, B2 NA Division 03 24-Dec-2017 25-Dec-2017 9:00 AM 27-Dec-2017 A Approved Closed

First coat dam proofing installation inspection for CMU, Morter and
Cluster 41,
2911 KHEP-CI-2911 Masonry inspection under exterior reinforced grade beam
BC4
NA Division 07 16-Dec-2017 17-Dec-2017 10:00 AM 19-Dec-2017 A Approved Closed
Cluster 41, BC4

Concrete sampling, testing and placement inspection for RC Column - Approved w/


2912 KHEP-CI-2912
Ground Floor Cluster 64, B2
Cluster 64, B2 NA Division 03 16-Dec-2017 17-Dec-2017 9:30 AM 19-Dec-2017 B comments
Closed

Concrete sampling, testing and placement inspection for RC Stair


2913 KHEP-CI-2913 First Flight- Ground Floor Cluster 63, B2 NA Division 03 16-Dec-2017 17-Dec-2017 9:30 AM 18-Dec-2017 A Approved Closed
Cluster 63, B2

Concrete sampling, testing and placement inspection for RC Columns Cluster 66,
2914 KHEP-CI-2914
- Ground Floor Cluster 66, A6 A6
NA Division 03 16-Dec-2017 17-Dec-2017 9:30 AM 18-Dec-2017 A Approved Closed

Concrete sampling, testing and placement inspection for RC Slab -


2915 KHEP-CI-2915 First Floor Stair & 2nd Flight Cluster 73, B2 NA Division 03 16-Dec-2017 17-Dec-2017 9:30 AM 19-Dec-2017 A Approved Closed
Cluster 73, B2
Concrete sampling, testing and placement inspection for RC Columns
Approved w/
2916 KHEP-CI-2916 - First Floor Cluster 71, Cluster 71, B2 NA Division 03 16-Dec-2017 17-Dec-2017 9:30 AM 19-Dec-2017 B comments
Closed
B2
Installation of reinforcing steel bar ,embedded item and form closure
Cluster 62,
2917 KHEP-CI-2917 inspection for RC Column Neck
BC6
NA Division 03 16-Dec-2017 17-Dec-2017 10:30 AM 19-Dec-2017 A Approved Closed
Cluster 62, BC6
Damproofing surface preparation for RC Footing Foundation &
Cluster 47,
2918 KHEP-CI-2918 Column Neck
BC6
NA Division 01 16-Dec-2017 17-Dec-2017 2:00 PM 19-Dec-2017 A Approved Closed
Cluster 47, BC6
Inspection of excavated and Compaction formation for Sewer
2919 KHEP-CI-2919 Manholes Sewer main Line Line 9 Zone 2B Division 31 16-Dec-2017 17-Dec-2017 11:30 AM 18-Dec-2017 A Approved Closed
Zone 2B, Line 9, MH-2-L09 to MH-1A-L09
Concrete sampling, testing and placement inspection for RC Grade Cluster 23,
2909.1 KHEP-CI-2909-01
Beam Cluster 23, BC4 BC4
NA Division 03 14-Jan-2018 15-Jan-2018 9:00 AM 20-Jan-2018 A Approved Closed

Concrete sampling, testing and placement inspection for RC first floor


2921 KHEP-CI-2921 slab & stair Cluster 33, Cluster 33, B2 NA Division 03 17-Dec-2017 18-Dec-2017 9:00 AM 20-Dec-2017 E Rejected Closed
B2
Concrete Sampling ,Testing & Placement Inspection for RC First
2921.1 KHEP-CI-2921-01
Floor Slab & Stair Cluster 33, B2
Cluster 33, B2 NA Division 03 24-Dec-2017 25-Dec-2017 9:00 AM 27-Dec-2017 A Approved Closed

Inspection of Damproofing Surface Preparation for Storm Manholes -


Line
(Precast yard ) MH-114-L27 - MH-116-L26 And MH-30-L04
2922 KHEP-CI-2922
And MH-107a-L30 - MH-32-L10 And MH-59-L13 And MH-107-
04,10,13,30,2 Zone 1B, 4B Division 33 17-Dec-2017 18-Dec-2017 10:30 AM 19-Dec-2017 A Approved Closed
7,26
L30 Zone 1B, 4B Line 04,10,13,30,27,26
Inspection of Reinforcement steel bar and internal shutter for Storm
Manholes -(Precast yard ) - MH-61-L18 And
MH-62-L18 MH-63-L18 And MH-119-L26 - MH-92-L21 And
Line Zone 3B,
2923 KHEP-CI-2923 MH-133-L36 And MH-134-L37
(18,26,36,37) 4B,5C
Division 33 17-Dec-2017 18-Dec-2017 2:00 PM 20-Dec-2017 A Approved Closed
Zone 3B, 4B,5C Line (18,26,36,37)

Inspection of Reinforcement steel bar and internal shutter for Storm


Catch Basin -(Precast yard ) CB-126 At MH-26-L08 And CB-
128 &CB-129 At MH-21-L08 CB-120 & CB-121 At MH-26a-L08
2924 KHEP-CI-2924
And CB-103 & CB-104 At MH-46-L15 CB-120 & CB-121 At MH-26a-
Line 08 Zone 1B, 4B Division 33 17-Dec-2017 18-Dec-2017 2:30 PM 19-Dec-2017 A Approved Closed
L08 And CB-103 & CB-104 At MH-46-L15 Line (08) , Zone 1B, 4B

Second coat, Bituminous damp proofing installation inspection for


storm manholes, - MH-21-L08 MH-26-L08 And MH-27-L07
2925 KHEP-CI-2925
MH-26a-L08 And MH-28-L07
Line 08 & 07 Zone 2B Division 33 17-Dec-2017 18-Dec-2017 11:00 AM 20-Dec-2017 A Approved Closed
Line (08,07) Zone 2B
Dam proofing surface preparation for RC grade beam (from inside)
2926 KHEP-CI-2926
Cluster 10,B2
Cluster 10 B2 NA Division 07 17-Dec-2017 18-Dec-2017 10:00 AM 19-Dec-2017 A Approved Closed

Dam proofing surface preparation for RC column neck & footing Cluster 28,
2927 KHEP-CI-2927
Cluster 28, BC4 BC4
NA Division 07 17-Dec-2017 18-Dec-2017 10:00 AM 19-Dec-2017 A Approved Closed

Dam proofing surface preparation for RC grade bam (from inside)


2928 KHEP-CI-2928
Cluster 5. B2
Cluster 5. B2 NA Division 07 17-Dec-2017 18-Dec-2017 10:00 AM 19-Dec-2017 A Approved Closed
Check the survey work, elevation and coordinate for blinding under Cluster
2929 KHEP-CI-2929
grade beam Cluster 36,BC4 36,BC4
NA Division 03 17-Dec-2017 18-Dec-2017 2:00 PM 19-Dec-2017 A Approved Closed

Installation of reinforcing steel bar embedded item and form closure Cluster
2930 KHEP-CI-2930
inspection for RC column (ground floor) Cluster 23,BC4 23,BC4
NA Division 03 17-Dec-2017 18-Dec-2017 2:00 PM 19-Dec-2017 A Approved Closed

Cast in place concrete formwork inspection for RC slab on grade axis


2931 KHEP-CI-2931
(E - G) Cluster 1, A6
Cluster 01 A6 NA Division 03 17-Dec-2017 18-Dec-2017 10:00 AM 19-Dec-2017 A Approved Closed

Installation of wire mesh embedded item and form closure inspection


2932 KHEP-CI-2932
for RC slab on grade axis (E - G) Cluster 1, A6
Cluster 01 A6 NA Division 03 17-Dec-2017 18-Dec-2017 10:00 AM 19-Dec-2017 A Approved Closed

Compaction test around footing general fill 3rd Layer Cluster Cluster 26,
2933 KHEP-CI-2933
26, BC4 - Zone 2B BC4
Zone 2B Division 31 17-Dec-2017 18-Dec-2017 10:30 AM 19-Dec-2017 A Approved Closed

Compaction test around footing general fill 3rd Layer Cluster Cluster 67,
2934 KHEP-CI-2934
67, A4 - Zone 4A A4
Zone 4A Division 31 17-Dec-2017 18-Dec-2017 10:30 AM 20-Dec-2017 A Approved Closed

Compaction test around footing general fill 2nd Layer Cluster Cluster 74,
2935 KHEP-CI-2935
74, BC4 - Zone 4B BC4
Zone 4B Division 31 17-Dec-2017 18-Dec-2017 10:30 AM 21-Dec-2017 A Approved Closed

Check the survey work, elevation and cordinate for blinding under Cluster 45,
2936 KHEP-CI-2936
gread beam Cluster 45, A6 A6
NA Division 1 17-Dec-2017 18-Dec-2017 9:30 AM 19-Dec-2017 A Approved Closed

Check the survey work, elevation and cordinate for blinding under Cluster 46,
2937 KHEP-CI-2937
gread beam Cluster 46, A6 A6
NA Division 1 17-Dec-2017 18-Dec-2017 9:45 AM 19-Dec-2017 A Approved Closed

70cm, CMU morter and masonry inspection under exterior reinforced


Cluster 78,
2938 KHEP-CI-2938 grade beam
BC4
NA Division 1 17-Dec-2017 18-Dec-2017 10:00 AM 19-Dec-2017 A Approved Closed
Cluster 78, BC4
Check the survey work, elevation and cordinate for blinding under
Cluster 80,
2939 KHEP-CI-2939 footing foundation Cluster 80,
BC6
NA Division 1 17-Dec-2017 18-Dec-2017 10:00 AM 19-Dec-2017 A Approved Closed
BC6

Concrete sampling, testing and placement inspection for rc first floor


2940 KHEP-CI-2940
slab & stair Cluster 4, A6
Cluster 4, A6 NA Division 03 31-Dec-2017 1-Jan-2018 9:00 AM 2-Jan-2018 A Approved Closed

Termite control surface preparation,installation and final inspection


Cluster 37,
2941 KHEP-CI-2941 for GRADE BEAM Cluster 37,
BC4
NA Division 03 18-Dec-2017 19-Dec-2017 9:00 AM 20-Dec-2017 A Approved Closed
BC4
Blinding concrete sampling, testing and placement inspection for
Cluster 37,
2942 KHEP-CI-2942 grade beam Cluster
BC4
NA Division 03 18-Dec-2017 19-Dec-2017 2:00 PM 20-Dec-2017 A Approved Closed
37, BC4
Cast in place concrete formwork inspection for RC GRADE BEAM Cluster 22,
2943 KHEP-CI- 2943
Cluster 22, BC4 BC4
NA Division 03 18-Dec-2017 19-Dec-2017 10:00 AM 21-Dec-2017 A Approved Closed

Installation of reinforcing steel bar embedded item and form closure Cluster 22,
2944 KHEP-CI- 2944
inspection for RC grade beam BC4
NA Division 03 18-Dec-2017 19-Dec-2017 10:00 AM 21-Dec-2017 A Approved Closed

Cast in place concrete formwork inspection for RC column (ground Cluster 18


2945 KHEP-CI- 2945
floor) Cluster 18, BC4 BC4
NA Division 03 18-Dec-2017 19-Dec-2017 10:00 AM 21-Dec-2017 A Approved Closed

Second coat dam proofing installation inspection for CMU, mortar Cluster 41,
2946 KHEP-CI- 2946
and masonry inspection under exterior reinforced GB Cluster 41, BC4 BC4
NA Division 07 18-Dec-2017 19-Dec-2017 10:00 AM 20-Dec-2017 A Approved Closed

Blinding concrete sampling, testing and placement inspection for


Cluster 53,
2947 KHEP-CI- 2947 Footing Foundation Cluster
BC6
NA Division 03 18-Dec-2017 19-Dec-2017 9:30 AM 20-Dec-2017 A Approved Closed
53, BC6
Blinding concrete sampling, testing and placement inspection for
Cluster 55,
2948 KHEP-CI- 2948 grade beam Cluster
BC4
NA Division 03 18-Dec-2017 19-Dec-2017 9:30 AM 20-Dec-2017 A Approved Closed
55, BC4

Concrete sampling, testing and placement inspection for rc Column


2949 KHEP-CI- 2949
first floor Cluster 51, B2
Cluster 51, B2 NA Division 03 18-Dec-2017 19-Dec-2017 9:30 AM 20-Dec-2017 A Approved Closed

Concrete sampling, testing and placement inspection for rc Grade


Cluster 60, Approved w/
2950 KHEP-CI- 2950 Beams Cluster
BC4
NA Division 03 18-Dec-2017 19-Dec-2017 9:30 AM 20-Dec-2017 B comments
Closed
60, BC4
Installation of reinforcing steel bar embedded item and form closure
2951 KHEP-CI- 2951 inspection for RC Columns First floor Cluster 52, Cluster 52, B2 NA Division 03 18-Dec-2017 19-Dec-2017 10:30 AM 20-Dec-2017 A Approved Closed
B2

Termite control surface preparation,installation and final inspection Cluster 80,


2952 KHEP-CI- 2952
for Footing Cluster 80, BC6 BC6
NA Division 03 18-Dec-2017 19-Dec-2017 10:00 AM 20-Dec-2017 A Approved Closed

Check the survey work, elevation and cordinate for blinding under
Cluster 56,
2953 KHEP-CI- 2953 gread beam Cluster
BC4
NA Division 01 18-Dec-2017 19-Dec-2017 2:00 PM 21-Dec-2017 A Approved Closed
56, BC4

Cast in place concrete formwork inspection for RC slab on grade axis


2954 KHEP-CI- 2954
(G - N) Cluster 1, A6
Cluster 01 A6 NA Division 03 25-Dec-2017 26-Dec-2017 10:30 AM 27-Dec-2017 A Approved Closed
installation of reinforcing steel bar ,embedded item and form closure
2955 KHEP-CI- 2955
inspection for RC SLAB ON GRADE AXIS ( G - N )
Cluster 01 A6 NA Division 03 25-Dec-2017 26-Dec-2017 10:30 AM 27-Dec-2017 A Approved Closed

Inspection for gravel filling around pipe sewer main line Dia 200mm Approved w/
2956 KHEP-CI- 2956
Zone 1B,Line 02
Line 02 Zone 1B Division 31 18-Dec-2017 19-Dec-2017 11:00 AM 21-Dec-2017 B comments
Closed

Inspection for gravel filling above pipe pipe trench with geotextile
protection sheet and laying warning tape sewer main line Dia 200mm Approved w/
2957 KHEP-CI- 2957
Zone 1B,Line 01 MH-8-L01 to MH-7-
Line 01 Zone 1B Division 31 18-Dec-2017 19-Dec-2017 11:00 AM 21-Dec-2017 B comments
Closed
L01 , MH-7-L01 to MH-6-L01
Compaction test of sand filling up to the pipe 1st layer around
2958 KHEP-CI- 2958 manhole - sewer main line Zone 1B ,Line 6,7 & 8 MH-4-L08 & MH-3- Line 6,7 & 8 Zone 1B Division 31 18-Dec-2017 19-Dec-2017 11:00 AM 23-Dec-2017 A Approved Closed
L08 -MH-2-L08 - MH-1-L-07 - MH-1-L06
Inspection Formwork and concrete pouring for sewer embedded pice
at manhole Zone 1B Line 1,2 MH-5-L02 and MH-
2959 KHEP-CI- 2959
3-L02 one side MH-5-A-L02 and MH-4-L02 and MH-7-L01 two side
Line 1,2 Zone 1B Division 31 18-Dec-2017 19-Dec-2017 2:30 PM 21-Dec-2017 E Rejected Closed
MH-8-L01 and MH-6-L01
Inspection Formwork and concrete pouring for sewer embedded pice
at manhole Zone 1B Line 1,2 MH-5-L02 and MH-
2959.1 KHEP-CI- 2959-01
3-L02 one side MH-5-A-L02 and MH-4-L02 and MH-7-L01 two side
Line 1,2 Zone 1B Division 31 26-Dec-2017 27-Dec-2017 2:30 AM 30-Dec-2017 E Rejected Closed
MH-8-L01 and MH-6-L01
Concrete Sampling Testing & Placement Inspection for RC Slab on
2920 KHEP-CI-2920
Grade Axis A-E Cluster 1 A6
Cluster 01 A6 NA Division 3 11-Jan-2018 13-Jan-2018 9:00 AM 14-Jan-2018 A Approved Closed

Blinding concrete sampling, testing and placement inspection for RC


Cluster 80, Approved w/
2960 KHEP-CI- 2960 footing foundation
BC6
NA Division 03 19-Dec-2017 20-Dec-2017 9:30 AM 21-Dec-2017 B comments
Closed
Cluster 80, BC6
Blinding concrete sampling, testing and placement inspection for RC
Cluster 45, Approved w/
2961 KHEP-CI- 2961 Grade Beam Cluster
A6
NA Division 03 19-Dec-2017 20-Dec-2017 9:30 AM 21-Dec-2017 B comments
Closed
45, A6
Blinding concrete sampling, testing and placement inspection for RC
Cluster 46,
2962 KHEP-CI- 2962 Grade Beam Cluster
A6
NA Division 03 19-Dec-2017 20-Dec-2017 9:30 AM 21-Dec-2017 A Approved Closed
46, A6
Concrete sampling, testing and placement inspection for rc slab Roof
2963 KHEP-CI- 2963 floor Cluster 75, Cluster 75, B2 NA Division 03 19-Dec-2017 20-Dec-2017 9:30 AM 21-Dec-2017 A Approved Closed
B2
Termite control surface preparation,installation and final inspection
Cluster 45,
2964 KHEP-CI- 2964 for RC Grade Beam Cluster
A6
NA Division 03 19-Dec-2017 20-Dec-2017 10:00 AM 21-Dec-2017 A Approved Closed
45, A6
Termite control surface preparation,installation and final inspection
Cluster 46,
2965 KHEP-CI- 2965 for RC Grade Beam Cluster
A6
NA Division 03 19-Dec-2017 20-Dec-2017 10:00 AM 21-Dec-2017 A Approved Closed
46, A6

Cast in place concrete formwork inspection for RC Column Ground Cluster 66,
2966 KHEP-CI- 2966
floor Cluster 66, A6 A6
NA Division 03 19-Dec-2017 20-Dec-2017 11:00 AM 21-Dec-2017 A Approved Closed

Box Closing & Grouting for storm embedded pice at Manhole Zone
2B, Line 01,04,21 MH-1-L01 three side & MH-I10-L04 two side MH-1-
2967 KHEP-CI- 2967
L01 & MH-2-L01 & MH-I13-L04 one side MH-77-L21 one side & MH-
Line 01,04,2 Zone 2B Division 33 19-Dec-2017 20-Dec-2017 10:30 AM 23-Dec-2017 A Approved Closed
78-L21 two side
Compaction test Around Footing general fill (4th layer) Cluster 79,
2968 KHEP-CI-2968
Zone 4B, Cluster 79, BC4 BC4
Zone 4B Division 31 19-Dec-2017 20-Dec-2017 10:30 AM 23-Dec-2017 A Approved Closed

Compaction test Around Footing general fill (4th layer) Cluster 70,
2969 KHEP-CI-2969
Zone 4B, Cluster 70, BC4 BC4
Zone 4B Division 31 19-Dec-2017 20-Dec-2017 11:30 AM 23-Dec-2017 A Approved Closed

Dam Proofing Surface preparation for RC Grade Beam (from inside)


2970 KHEP-CI-2970
Cluster 7,B2
Cluster 7,B2 NA Division 07 19-Dec-2017 20-Dec-2017 10:00 AM 21-Dec-2017 A Approved Closed

Compation test Around Footing general fill (4th layer) Cluster 41,
2971 KHEP-CI-2971
Zone 2B, Cluster 41, BC4 BC4
Zone 2B Division 31 20-Dec-2017 21-Dec-2017 2:30 PM 24-Dec-2017 A Approved Closed

Compaction test Around Footing general fill (4th layer) Cluster 42,
2972 KHEP-CI-2972
Zone 2B, Cluster 42, BC4 BC4
Zone 2B Division 31 20-Dec-2017 21-Dec-2017 2:30 PM 24-Dec-2017 A Approved Closed

Cast In Place Concrete Formwork Inspection for RC Roof Slab


2973 KHEP-CI-2973
Cluster 19, B2
Cluster 19 B2 NA Division 03 20-Dec-2017 21-Dec-2017 11:00 AM 24-Dec-2017 A Approved Closed

Installation of Rainforcing steel bar Embedded item and Closure


Approved w/
2974 KHEP-CI-2974 Inspection for RC Roof Slab Cluster 19 B2 NA Division 03 20-Dec-2017 21-Dec-2017 11:00 AM 24-Dec-2017 B comments
Closed
Cluster 19, B2
Termite Control Surface Preparation, Installation and final inspection
Cluster 36,
2975 KHEP-CI-2975 for Grade Beam
BC4
NA Division 03 20-Dec-2017 21-Dec-2017 9:00 AM 23-Dec-2017 A Approved Closed
Cluster 36, BC4
Blinding Concrete Sampling Testing & Placement Inspection for
Cluster 36,
2976 KHEP-CI-2976 Grade Beam
BC4
NA Division 03 20-Dec-2017 21-Dec-2017 2:00 PM 23-Dec-2017 A Approved Closed
Cluster 36, BC4
Concrete sampling, testing and placement inspection for RC Slab first
2977 KHEP-CI-2977 floor Cluster 58, B2 NA Division 03 20-Dec-2017 21-Dec-2017 9:30 AM 24-Dec-2017 A Approved Closed
Cluster 58, B2

Cast In Place Concrete Formwork Inspection for RC Column Neck Cluster 62, Approved w/
2978 KHEP-CI-2978
Cluster 62, BC6 BC6
NA Division 03 20-Dec-2017 21-Dec-2017 10:30 AM 24-Dec-2017 B comments
Closed

Inspection for Excavated and compaction formation for sewer


Manholes, sewer main line
2979 KHEP-CI-2979
Zone 2B, Line 28,29,30
Line 28,29,30 Zone 2B Division 31 20-Dec-2017 21-Dec-2017 11:30 AM 24-Dec-2017 A Approved Closed
MH-1-A-L29 , MH-1-L28 , MH-1-A-L30
Blinding concrete sampling, testing and placement inspection for
Manhole sewer main line
2980 KHEP-CI-2980
Zone 2B , Line 09
Line 09 Zone 2B Division 31 20-Dec-2017 21-Dec-2017 11:30 AM 24-Dec-2017 A Approved Closed
MH-2-L-09 , MH-1-A-L09
Inspection Formwork for base & wall and concrete pouring for Storm
Manholes
Line
2981 KHEP-CI-2981 Zone 3B,4B,5C Line 18,26,36,37
18,26,36,37
Zone 3B Division 33 20-Dec-2017 21-Dec-2017 2:00 PM 24-Dec-2017 A Approved Closed
MH-61-L18 and MH-62-L18 MH-63-L18 and MH-119-L26 MH-92-L21
MH-133-L36 and MH-134-L37
Inspection for Excavated and compaction formation for Pipe
Trench,Portable Fire Fighting Dia160mm
2982 KHEP-CI-2982
Zone 1B, P 109,111
P 109,111 Zone 1B Division 31 20-Dec-2017 21-Dec-2017 11:00 AM 24-Dec-2017 E Rejected Closed
ISO-60-P109 to ISO-60-P111
Inspection for Excavated and compaction formation for Pipe
Trench,Portable Fire Fighting Dia160mm
2982.1 KHEP-CI-2982-01
Zone 1B, P 109,111
P 109,111 Zone 1B Division 31 26-Dec-2017 27-Dec-2017 11:00 AM 30-Dec-2017 A Approved Closed
ISO-60-P109 to ISO-60-P111
First Coat Dam Proofing Installation Inspection for CMU Moter and
Cluster 40,
2983 KHEP-CI-2983 Masonary Inspection Under Exterior Reinforced Grade Beam Cluster
BC4
NA Division 07 21-Dec-2017 23-Dec-2017 10:00 AM 24-Dec-2017 A Approved Closed
40, BC4
First Coat Dam Proofing Installation Inspection for Grade Beam
2984 KHEP-CI-2984
(From Inside) Cluster 11, B2
Cluster 11 B2 NA Division 07 21-Dec-2017 23-Dec-2017 10:00 AM 24-Dec-2017 A Approved Closed

First Coat Dam Proofing Installation Inspection for Grade Beam


2985 KHEP-CI-2985
(From Inside) Cluster 10, B2
Cluster 10 B2 NA Division 07 21-Dec-2017 23-Dec-2017 10:00 AM 24-Dec-2017 A Approved Closed

Dam Proofing Preparation for RC Grade Beam (From Inside) Cluster


2986 KHEP-CI-2986
08, B2
Cluster 08, B2 NA Division 07 21-Dec-2017 23-Dec-2017 10:00 AM 24-Dec-2017 A Approved Closed

Installation of Rainforcing steel bar Embedded item and Closure


2987 KHEP-CI-2987
Inspection for RC Column First floor Cluster 73, B2
Cluster 73, B2 NA Division 03 21-Dec-2017 23-Dec-2017 9:30 AM 25-Dec-2017 E Rejected Closed

Installation of Reinforcing steel bar Embedded item and Closure


2987.1 KHEP-CI-2987-01
Inspection for RC Column First floor Cluster 73, B2
Cluster 73, B2 NA Division 03 25-Dec-2017 26-Dec-2017 9:30 AM 27-Dec-2017 A Approved Closed

Cast In Place Concrete Formwork Inspection for RC Grade Beams Cluster 50,
2988 KHEP-CI-2988
Cluster 50, BC4 BC4
NA Division 03 21-Dec-2017 23-Dec-2017 2:00 PM 25-Dec-2017 A Approved Closed

Installation of Rainforcing steel bar Embedded item and Closure Cluster 50,
2989 KHEP-CI-2989
Inspection for RC Grade Beam Cluster 50, BC4 BC4
NA Division 03 21-Dec-2017 23-Dec-2017 2:30 PM 25-Dec-2017 A Approved Closed

Cast In Place Concrete Formwork Inspection for RC Slab Cluster 50,


2990 KHEP-CI-2990
BC4
Cluster 61, B2 NA Division 03 21-Dec-2017 23-Dec-2017 10:30 AM 25-Dec-2017 A Approved Closed

Installation of Rainforcing steel bar Embedded item and Closure Approved w/


2991 KHEP-CI-2991
Inspection for RC Slab Cluster 61, B2
Cluster 61, B2 NA Division 03 21-Dec-2017 23-Dec-2017 11:00 AM 25-Dec-2017 B comments
Closed

Termite Control Surface Preparation, Installation and final inspection


Cluster 56,
2992 KHEP-CI-2992 for RC Grade Beam
BC4
NA Division 03 21-Dec-2017 23-Dec-2017 1:30 PM 25-Dec-2017 A Approved Closed
Cluster 56, BC4
Concrete Sampling Testing and Placement Inspection For RC Slab on Approved w/
2993 KHEP-CI-2993
Grade Axis(E,G) Cluster 01, A6
Cluster 01 A6 NA Division 03 21-Dec-2017 23-Dec-2017 9:00 AM 24-Dec-2017 B comments
Closed

Compaction Test excavated Formation level bottom of foundation Cluster 57,


2994 KHEP-CI-2994
Zone 3B, Cluster 57, BC4 2nd Layer BC4
Zone 3B Division 31 21-Dec-2017 23-Dec-2017 2:00 AM 25-Dec-2017 A Approved Closed

Compaction Test round Footing general dill Final Layer Zone 2B, Cluster 39,
2995 KHEP-CI-2995
Cluster 39, BC6 2nd Layer BC6
Zone 2B Division 31 21-Dec-2017 23-Dec-2017 2:00 AM 25-Dec-2017 A Approved Closed

Inspection for Excavated and compaction formation for sewer


2996 KHEP-CI-2996
Manholes sewer main line MH-1-L27 Zone 2B ,Line 27
Line 27 Zone 2B Division 31 21-Dec-2017 23-Dec-2017 11:30 AM 24-Dec-2017 A Approved Closed

Inspection for Excavated and compaction formation for Storm


2997 KHEP-CI-2997
Manholes Storm main line MH-79-L21 Zone 3B ,Line 21
Line 21 Zone 3B Division 31 21-Dec-2017 23-Dec-2017 11:30 AM 24-Dec-2017 A Approved Closed

Installation Inspection of Precast Storm Drainage Manholes MH-122-


2998 KHEP-CI-2998
L33 to MH-121-L33 Zone 3B Line 33
Line 33 Zone 3B Division 33 21-Dec-2017 23-Dec-2017 11:00 AM 24-Dec-2017 A Approved Closed

Inspection of Pre Back Filling for Around Manhole Storm main line
2999 KHEP-CI-2999
Zone 1B, Line 11, MH-I33-L11 to MH-I34-L11
Line 11 Zone 1B Division 31 21-Dec-2017 23-Dec-2017 11:00 AM 25-Dec-2017 A Approved Closed
Inspection Form work for base & wall and concrete Pouring for Storm
Catch Basin (Precast yard) Zone 1B.4B Line 08 CB-126 at MH-26-L08
3000 KHEP-CI-3000 and CB-128&CB-129 at MH-21-L08 CB-120&CB-121 at MH-26A-L08 Line 08 Zone 1B.4B Division 33 21-Dec-2017 23-Dec-2017 2:30 PM 25-Dec-2017 E Rejected Closed
and CB-103&CB-104 at MH-46-L15 CB-110&CB-111&CB-122&CB-113
at MH-27-L07 and CB-114 at MH-28-L07

Inspection Form work for base & wall and concrete Pouring for Storm
Catch Basin (Precast yard) Zone 1B.4B Line 08 CB-126 at MH-26-L08
3000.1 KHEP-CI-3000-01 and CB-128&CB-129 at MH-21-L08 CB-120&CB-121 at MH-26A-L08 Line 08 Zone 1B.4B Division 33 26-Dec-2017 27-Dec-2017 10:30 AM 30-Dec-2017 A Approved Closed
and CB-103&CB-104 at MH-46-L15 CB-110&CB-111&CB-122&CB-113
at MH-27-L07 and CB-114 at MH-28-L07

Cast In Place Concrete Form work Inspection for RC Column first Approved w/
3001 KHEP-CI-3001
floor Cluster 27, B2
Cluster 27, B2 NA Division 03 21-Dec-2017 23-Dec-2017 10:00 AM 24-Dec-2017 B comments
Closed

Check The Survey work elevation and Coodinate for blinding under Cluster 25,
3002 KHEP-CI-3002
Grade Beam Cluster 25, BC4 BC4
NA Division 03 21-Dec-2017 23-Dec-2017 2:00 AM 24-Dec-2017 A Approved Closed

Compaction test around footing general fill 2nd Layer Cluster Cluster 70,
3003 KHEP-CI-3003
70, BC4 - Zone 4B BC4
Zone 4B Division 31 23-Dec-2017 24-Dec-2017 11:00 AM 25-Dec-2017 A Approved Closed

Installation of Rainforcing steel bar Embedded item and form Closure Cluster 9,
3004 KHEP-CI-3004
Inspection for RC Column First floor Cluster 9, BC4 BC4
NA Division 03 23-Dec-2017 24-Dec-2017 2:00 PM 25-Dec-2017 A Approved Closed

Concrete Sampling Testing and Placement Inspection For RC First Cluster 9,


3005 KHEP-CI-3005
floor Slab & Stair Cluster 9, BC4 BC4
NA Division 03 23-Dec-2017 24-Dec-2017 9:00 AM 25-Dec-2017 A Approved Closed

Concrete Sampling Testing and Placement Inspection For RC Column


3006 KHEP-CI-3006
Neck Cluster 31, B2
Cluster 31, B2 NA Division 03 23-Dec-2017 24-Dec-2017 9:00 AM 25-Dec-2017 A Approved Closed

70cm CMU Morter and Masonry Inspection Under Exterior Reinforced Cluster 26
3007 KHEP-CI-3007
Grade Beam Cluster 26 BC4 BC4
NA Division 03 23-Dec-2017 24-Dec-2017 2:00 PM 25-Dec-2017 A Approved Closed

Compaction test of Sand filling above the pipe 2nd Layer & laying
3008 KHEP-CI-3008 warning tape around Manhole Sewer Main Line Zone 1B Line 6,7,8 Line 6,7,8 Zone 1B Division 31 23-Dec-2017 24-Dec-2017 11:00 AM 25-Dec-2017 A Approved Closed
MH-4-L08 & MH-3-L08 MH-2-L08 MH-1-L07 MH-1-L06

Inspection of Sanding Filling around pipe Storm Main Line Dia


500mm Zone 1B Line 15 MH-47-L15 to MH-48-L15 MH-48-L15 to Approved w/
3009 KHEP-CI-3009
MH-49-L15 MH-49-L15 to MH-50-L15 MH-50-L15 to MH-51-L15 &
Line 15 Zone 1B Division 31 23-Dec-2017 24-Dec-2017 11:00 AM 25-Dec-2017 B comments
Closed
MH-51-L15 to MH-52-L15

Inspection Form Work for Storm embedded Pice at Manhole Zone 2B


3010 KHEP-CI-3010 Line 1,4,21 MH-I8-L01 three side & MH-I10-L04 two side MH-1-L01 Line 1,4,21 Zone 2B Division 33 23-Dec-2017 24-Dec-2017 10:30 AM 25-Dec-2017 A Approved Closed
& MH-2-L01 & MH-I13-L04 one side & MH-78-L21 two side

Concrete Sampling Testing and Placement Inspection For RC Column


3011 KHEP-CI-3011
Ground Floor Cluster 66, A6
Cluster 66 NA Division 03 23-Dec-2017 24-Dec-2017 9:30 AM 25-Dec-2017 E Rejected Closed

Concrete Sampling Testing and Placement Inspection For RC Inside Cluster 66,
3011.1 KHEP-CI-3011-01
Coverage of Grid Lines1-6 & A-H Column Ground Floor Cluster 66, A6 A6
NA Division 03 26-Dec-2017 27-Dec-2017 9:30 AM 28-Dec-2017 A Approved Closed

First Coat Dam Proofing Installation Inspection for CMU Moter and
Cluster 77,
3012 KHEP-CI-3012 Masonary Inspection Under Exterior Reinforced Grade Beam Cluster
BC4
NA Division 07 23-Dec-2017 24-Dec-2017 10:00 AM 25-Dec-2017 A Approved Closed
77, BC4
Installation of Rainforcing steel bar Embedded item and form Closure
3013 KHEP-CI-3013
Inspection for RC Column First floor Cluster 58, B2
Cluster 58, B2 NA Division 07 23-Dec-2017 24-Dec-2017 2:00 PM 25-Dec-2017 A Approved Closed

Second coat dam proofing installation inspection for CMU, mortar Cluster 40,
3014 KHEP-CI-3014
and masonry inspection under exterior reinforced GB Cluster 40, BC4 BC4
NA Division 07 23-Dec-2017 24-Dec-2017 10:00 AM 25-Dec-2017 A Approved Closed

Second coat dam proofing installation inspection for Grade Beam


3015 KHEP-CI-3015
From Inside Cluster 11, B2
Cluster 11 B2 NA Division 07 23-Dec-2017 24-Dec-2017 10:00 AM 25-Dec-2017 A Approved Closed

Second coat dam proofing installation inspection for Grade Beam


3016 KHEP-CI-3016
From Inside Cluster 10, B2
Cluster 10 B2 NA Division 07 23-Dec-2017 24-Dec-2017 10:00 AM 25-Dec-2017 A Approved Closed

First Coat Damp Roofing Installation Inspection for Grade Beam From
3017 KHEP-CI-3017
Inside Cluster 07 B2
Cluster 07 B2 NA Division 07 23-Dec-2017 24-Dec-2017 10:00 AM 25-Dec-2017 A Approved Closed

First Coat Damp Roofing Installation Inspection for Grade Beam From
3018 KHEP-CI-3018
Inside Cluster 05 B2
Cluster 05 B2 NA Division 07 23-Dec-2017 24-Dec-2017 10:00 AM 25-Dec-2017 A Approved Closed

Termite control surface preparation, installation and final inspection


3019 KHEP-CI-3019
for GRADE BEAM CLUSTER 24, BC4
Cluster 24 NA Division 03 24-Dec-2017 25-Dec-2017 9:00 AM 26-Dec-2017 A Approved Closed

Termite control surface preparation, installation and final inspection Cluster 25


3020 KHEP-CI-3020
for GRADE BEAM Cluster 25 BC4 BC4
NA Division 03 24-Dec-2017 25-Dec-2017 9:00 AM 26-Dec-2017 A Approved Closed

Termite control surface preparation,installation and final inspection


3021 KHEP-CI-3021
for slab on grad Cluster 02 A6
Cluster 02 A6 NA Division 03 24-Dec-2017 25-Dec-2017 9:00 AM 26-Dec-2017 A Approved Closed

Second Coat Dam Proofing Installation Inspection for Grade Beam


3022 KHEP-CI-3022
(From Inside) Cluster 5 - B2
Cluster 5 - B2 NA Division 07 24-Dec-2017 25-Dec-2017 10:00 AM 26-Dec-2017 A Approved Closed
Concrete Sampling, Testing And Placement Inspection for RC Grade Cluster 22,
3023 KHEP-CI-3023
Beam Cluster 22, Bc4 Bc4
NA Division 03 24-Dec-2017 25-Dec-2017 9:00 AM 27-Dec-2017 A Approved Closed

Second Coat Dam proofing Installation Inspection for Grade Beam


3024 KHEP-CI-3024
from inside Cluster 7, B2
Cluster 7, B2 NA Division 07 24-Dec-2017 25-Dec-2017 10:00 AM 26-Dec-2017 A Approved Closed

Inspection of Pre back filling for Manhole Storm Main Line Zone 1B
3025 KHEP-CI-3025 Line 15 MH-47-L15 MH-48-L15 MH-49-L15 and MH-51-L15 MH-50- Line 15 Zone-1B Division 31 24-Dec-2017 25-Dec-2017 11:00 AM 26-Dec-2017 A Approved Closed
L15 and MH-52-L15
Inspection for Excavated formation for pipe Trench sewer main line
Approved w/
3026 KHEP-CI-3026 Dia 200mm MH-7-L02 to MH-MH-6-L02 MH-6-L02 to MH-5-L02 Zone Line 2 Zone1B Division 31 24-Dec-2017 25-Dec-2017 11:30 AM 26-Dec-2017 B comments
Closed
3B ,Line 21
First Coat Bituminnous damp proofing installation inspection for
Line
storm manholes precast yard Zone 1B,4B Line 04,10,13,30,27,26
3027 KHEP-CI-3027
MH-114-L27 MH-116-L26 & MH-30-L04 & MH-107A-L30 MH-332-L10
04,10,13,30,2 Zone 1B,4B Division 33 24-Dec-2017 25-Dec-2017 10:30 AM 26-Dec-2017 A Approved Closed
7,26
& MH-59-L13 & MH-107-L30

Inspection for Dam Proofing Surface Preparation for Storm Manholes


3028 KHEP-CI-3028 Precast Yard Zone 1B,4B Line 19,15,27 MH-115-L27 MH-117-L27 & Line 19,15,27 Zone 1B,4B Division 33 24-Dec-2017 25-Dec-2017 2:30 AM 27-Dec-2017 A Approved Closed
MH-66-L19 MH-57-L15 & MH-58-L15 & MH-65-L19

Cast In Place Concrete Form work Inspection for RC Column first


3029 KHEP-CI-3029
floor Cluster 52, B2
Cluster 52, B2 NA Division 03 24-Dec-2017 25-Dec-2017 10:00 AM 26-Dec-2017 A Approved Closed

Second Coat, Damproofing installation inspection for CMU, Morter


Cluster 77
3030 KHEP-CI-3030 and Masonry Inspection under Exterior Reinforced grade beam
BC4
NA Division 07 24-Dec-2017 25-Dec-2017 10:30 AM 26-Dec-2017 A Approved Closed
Cluster 77 BC4
Cast in place concrete formwork inspection for RC footing Cluster 32 Cluster 32
3031 KHEP-CI-3031
BC6 BC6
NA Division 03 24-Dec-2017 25-Dec-2017 10:00 AM 27-Dec-2017 A Approved Closed

Installation of reinforcing steel bar ,embedded item and form closure Cluster 32
3032 KHEP-CI-3032
inspection for RC footing Cluster 32 BC6 BC6
NA Division 03 24-Dec-2017 25-Dec-2017 10:00 AM 26-Dec-2017 A Approved Closed

Concrete Sampling, Testing and Placement Inspection for RC Column


3033 KHEP-CI-3033
Ground Floor Cluster 43 A6
Cluster 43 A6 NA Division 03 24-Dec-2017 25-Dec-2017 9:00 AM 27-Dec-2017 A Approved Closed

Concrete Sampling, Testing and Placement Inspection for RC Column Cluster 16


3034 KHEP-CI-3034
First Floor Cluster 16 Bc4 Bc4
NA Division 03 24-Dec-2017 25-Dec-2017 9:00 AM 27-Dec-2017 A Approved Closed

Compaction test around footing general fill 5th Layer Cluster Cluster 41,
3035 KHEP-CI-3035
41, BC4 - Zone 2B BC4
Zone 2B Division 31 25-Dec-2017 26-Dec-2017 2:00 AM 27-Dec-2017 A Approved Closed

Compaction test around footing general fill 5th Layer Cluster Cluster 42,
3036 KHEP-CI-3036
42, BC4 - Zone 2B BC4
Zone 2B Division 31 25-Dec-2017 26-Dec-2017 2:00 AM 27-Dec-2017 A Approved Closed

Compaction test 1st & final Layer Structural fill Cluster 57, BC4 - Cluster 57,
3037 KHEP-CI-3037
Zone 3B BC4
Zone 3B Division 31 25-Dec-2017 26-Dec-2017 2:00 AM 27-Dec-2017 A Approved Closed

Dam proofing Surface Preparation for RC Grade Beam from Inside


3038 KHEP-CI-3038
Cluster 17 B2
Cluster 17 B2 NA Division 07 25-Dec-2017 26-Dec-2017 10:00 AM 27-Dec-2017 A Approved Closed

Dam proofing Surface Preparation for RC Grade Beam from Inside


3039 KHEP-CI-3039
Cluster 20 B2
Cluster 20 B2 NA Division 07 25-Dec-2017 26-Dec-2017 10:00 AM 27-Dec-2017 A Approved Closed

First Coat Dam proofing Installation Inspection for footing & Column Cluster 28
3040 KHEP-CI-3040
Neck Cluster 28 BC4 BC4
NA Division 07 25-Dec-2017 26-Dec-2017 10:00 AM 27-Dec-2017 A Approved Closed

First Coat Damp Roofing Installation Inspection for footing & Column Cluster 28
3041 KHEP-CI-3041
Neck Cluster 28 BC4 BC4
NA Division 07 25-Dec-2017 26-Dec-2017 10:00 AM 27-Dec-2017 A Approved Closed

Concrete Sampling, Testing and Placement Inspection for RC Column Cluster 18


3042 KHEP-CI-3042
Ground Floor Cluster 18 BC4 BC4
NA Division 03 25-Dec-2017 26-Dec-2017 9:00 AM 27-Dec-2017 A Approved Closed

Concrete Sampling, Testing and Placement Inspection for RC Column


3043 KHEP-CI-3043
First Floor Cluster 27 B2
Cluster 27 B2 NA Division 03 25-Dec-2017 26-Dec-2017 9:00 AM 27-Dec-2017 A Approved Closed

Concrete Sampling, Testing and Placement Inspection for RC Roof


3044 KHEP-CI-3044
Slab Cluster 19 B2
Cluster 19 B2 NA Division 03 25-Dec-2017 26-Dec-2017 9:00 AM 27-Dec-2017 A Approved Closed

Blinding Concrete Sampling, Testing and Placement Inspection for Cluster 24


3045 KHEP-CI-3045
Grade Beam Cluster 24 BC4 BC4
NA Division 03 25-Dec-2017 26-Dec-2017 2:00 AM 27-Dec-2017 A Approved Closed

Blinding Concrete Sampling, Testing and Placement Inspection for Cluster 25


3046 KHEP-CI-3046
Grade Beam Cluster 25 BC4 BC4
NA Division 03 25-Dec-2017 26-Dec-2017 2:00 AM 27-Dec-2017 A Approved Closed

Cast In Place Concrete Form work Inspection for RC Stair First Floor
3047 KHEP-CI-3047
Ground Floor Cluster 64 B2
Cluster 64 B2 NA Division 03 25-Dec-2017 26-Dec-2017 10:00 AM 27-Dec-2017 A Approved Closed

Installation of Rainforcing steel bar Embedded item form Closure


3048 KHEP-CI-3048
Inspection for RC Stair First Flight Ground Floor Cluster 64 B2
Cluster 64 B2 NA Division 03 25-Dec-2017 26-Dec-2017 10:30 AM 27-Dec-2017 A Approved Closed

Blinding Concrete Sampling, Testing and Placement Inspection for Cluster 56


3049 KHEP-CI-3049
Grade Beam Cluster 56 BC4 BC4
NA Division 03 25-Dec-2017 26-Dec-2017 9:30 AM 27-Dec-2017 A Approved Closed

Installation of Rainforcing steel bar Embedded item form Closure Cluster 62


3050 KHEP-CI-3050
Inspection for RC Column Neck Cluster 62 BC6 BC6
NA Division 03 25-Dec-2017 26-Dec-2017 9:30 AM 27-Dec-2017 A Approved Closed
Inspection of Dam proofing Surface Preparation for Storm Manholes
Line 01, 18,
Precast yard Zone 2B, 3B, 4B, 5C Line 01, 18, 19, 21, 26, 33, 34 MH- Zone 2B, 3B,
3051 KHEP-CI-3051
1-L01 and MH-73-L19 MH-79-L21 and MH-74-L18 MH-118-L26 and
19, 21, 26,
4B, 5C
Division 33 25-Dec-2017 26-Dec-2017 11:30 AM 31-Dec-2017 A Approved Closed
33, 34
MH-128-L34 and MH-123-L33
Inspection of Reinforcement steel bar and internal shutter for Storm
Line
Manholes Precast yard Zone 3B, 4B,5C Line 18,24,26,34,38 MH-64- Zone 3B,
3052 KHEP-CI-3052
L18 And MH-75-L18 MH-95-L24 And MH-120-L26 MH-129-L34 And
18,24,26,34,3
4B,5C
Division 33 25-Dec-2017 26-Dec-2017 2:00 AM 27-Dec-2017 A Approved Closed
8
MH-130-L34 And MH-135-L38
Installation of reinforcing steel bar embedded item and form closure
3053 KHEP-CI-3053
inspection for RC column first floor Cluster 33 B2
Cluster 33 B2 NA Division 03 25-Dec-2017 26-Dec-2017 11:00 AM 27-Dec-2017 A Approved Closed

Concrete Sampling, Testing and Placement Inspection for RC Grade Cluster 50


3054 KHEP-CI-3054
Beam Cluster 50 BC4 BC4
NA Division 03 26-Dec-2017 27-Dec-2017 9:30 AM 28-Dec-2017 A Approved Closed

Concrete Sampling, Testing and Placement Inspection for RC Slab &


3055 KHEP-CI-3055
Beam's Roof Floor Cluster 61 B2
Cluster 61 B2 NA Division 03 26-Dec-2017 27-Dec-2017 9:30 AM 28-Dec-2017 A Approved Closed

Concrete Sampling, Testing and Placement Inspection for RC


3056 KHEP-CI-3056
Column's First Floor Cluster 52 B2
Cluster 52 B2 NA Division 03 26-Dec-2017 27-Dec-2017 9:30 AM 28-Dec-2017 A Approved Closed

First Coat Dam proofing Installation Inspection for RC Footing & Cluster 47
3057 KHEP-CI-3057
Cloumn Neck Cluster 47 BC6 BC6
NA Division 07 26-Dec-2017 27-Dec-2017 11:00 AM 28-Dec-2017 A Approved Closed

70cm CMU Morter and Masonry Inspection Under Exterior Reinforced Cluster 76
3058 KHEP-CI-3058
Grade Beam Cluster 76 BC4 BC4
NA Division 03 26-Dec-2017 27-Dec-2017 10:00 AM 28-Dec-2017 A Approved Closed

70cm CMU Morter and Masonry Inspection Under Exterior Reinforced Cluster 74
3059 KHEP-CI-3059
Grade Beam Cluster 74 BC4 BC4
NA Division 03 26-Dec-2017 27-Dec-2017 10:30 AM 28-Dec-2017 A Approved Closed

70cm CMU Morter and Masonry Inspection Under Exterior Reinforced Cluster 79
3060 KHEP-CI-3060
Grade Beam Cluster 79 BC4 BC4
NA Division 03 26-Dec-2017 27-Dec-2017 10:35 AM 28-Dec-2017 A Approved Closed

70cm CMU Morter and Masonry Inspection Under Exterior Reinforced


3061 KHEP-CI-3061
Grade Beam Cluster 67 A4
Cluster 67 A4 NA Division 03 26-Dec-2017 27-Dec-2017 10:45 AM 28-Dec-2017 A Approved Closed

Cast In Place Concrete Form work Inspection for RC Footing Cluster 53


3062 KHEP-CI-3062
Foundation Cluster 53 BC6 BC6
NA Division 03 26-Dec-2017 27-Dec-2017 2:30 AM 30-Dec-2017 A Approved Closed

Installation of Reinfocing Steel Bar Embedded item & Form Closure Cluster 53
3063 KHEP-CI-3063
Inspection for RC Footing Foundation Cluster 53 BC6 BC6
NA Division 03 26-Dec-2017 27-Dec-2017 3:00 AM 30-Dec-2017 A Approved Closed

Second Coat Dam proofing Installation Inspection for Grade Beam


3064 KHEP-CI-3064
from inside Cluster 8 B2
Cluster 8 B2 NA Division 07 26-Dec-2017 27-Dec-2017 10:00 AM 28-Dec-2017 A Approved Closed

Cast in place concrete form work inspection for RC column first floor
3065 KHEP-CI-3065
Cluster 33 B2
Cluster 33 B2 NA Division 07 26-Dec-2017 27-Dec-2017 2:30 PM 30-Dec-2017 A Approved Closed

Cast in place concrete form work inspection for RC column first floor
3066 KHEP-CI-3066
Cluster 6 BC4
Cluster 6 BC4 NA Division 07 26-Dec-2017 27-Dec-2017 2:30 PM 30-Dec-2017 A Approved Closed

Dam proofing Surface Preparation for RC Footing & Column Neck Cluster 29
3067 KHEP-CI-3067
Cluster 29 BC4 BC4
NA Division 07 26-Dec-2017 27-Dec-2017 10:00 AM 28-Dec-2017 A Approved Closed

Cast in place concrete form work inspection for RC Roof Slab Cluster
3068 KHEP-CI-3068
20 B2
Cluster 20 B2 NA Division 03 26-Dec-2017 27-Dec-2017 10:30 AM 31-Dec-2017 E Rejected Closed

Cast in place concrete form work inspection for RC Roof Slab Cluster
3068.1 KHEP-CI-3068-01
20 B2
Cluster 20 B2 NA Division 03 14-Jan-2018 15-Jan-2018 9:00 AM 16-Jan-2018 A Approved Closed

Installation of Reinforcing Steel Bar Embedded Item And Form


3069 KHEP-CI-3069
Closure Inspection for RC Roof Slab Cluster 20 B2
Cluster 20 B2 NA Division 03 26-Dec-2017 27-Dec-2017 10:30 AM 31-Dec-2017 A Approved Closed

Second Coat Dam proofing Installation Inspection for Footing & Cluster 28
3070 KHEP-CI-3070
Column Neck Cluster 28 BC4 BC4
NA Division 07 26-Dec-2017 27-Dec-2017 10:00 AM 30-Dec-2017 A Approved Closed

Inspection Formwork & Concrete Pouring for Sewer Embedded pice


3071 KHEP-CI-3071 at Manhole Zone 4B Line 01 MH-21-L01 & MH-16-L01 One Side MH- Line 01 Zone 4B Division 31 26-Dec-2017 27-Dec-2017 2:30 PM 30-Dec-2017 E Rejected Closed
19-L01 & MH-18L01 & MH-17-L01 Two Side

Inspection of Gravel Bedding Installation under Pipe Trench with


Approved w/
3072 KHEP-CI-3072 Geotextile Protection Sheet sewer Main Line Dia 200mm Zone 1B Line 01 Zone 1B Division 31 26-Dec-2017 27-Dec-2017 11:00 AM 30-Dec-2017 B comments
Closed
Line 01 MH-6-L01 to MH-5-L01
Compaction Test Around Footing general fill 3rd Layer Zone 2B Cluster 39 Approved w/
3073 KHEP-CI-3073
Cluster 39 BC6 BC6
Zone 2B Division 31 26-Dec-2017 27-Dec-2017 2:00 PM 31-Dec-2017 B comments
Closed

Compaction Test Around Footing general fill 3rd Layer Zone 4B Cluster 70 Approved w/
3074 KHEP-CI-3074
Cluster 70 BC4 BC4
Zone 4B Division 31 26-Dec-2017 27-Dec-2017 2:00 PM 31-Dec-2017 B comments
Closed

Inspection of Concrete Pouring for Storm Embedded pice at Manhole


MH-I8-L01 three side & MH-I10-L04 two side MH-1-L01 & MH-2-L01
3075 KHEP-CI-3075
and MH-I13-L04 one side MH-77-L21 one side & MH-78-L251-two
Line 1,4,21 Zone 2B Division 33 27-Dec-2017 28-Dec-2017 10:30 AM 30-Dec-2017 A Approved Closed
side Zone 2B Line 1,4,21
Blinding Concrete sampling testing & Placement Inspection for Approved w/
3076 KHEP-CI-3076
Manhole Storm Main Line Zone 3B Line 21 MH-79-L21
Line 21 Zone 3B Division 31 27-Dec-2017 28-Dec-2017 11:30 AM 30-Dec-2017 B comments
Closed

Installation of Sewer GRP Manholes Sewer mani line Zone 4B, Line 1
3077 KHEP-CI-3077
MH-21-L01& MH-16-L01 MH-19-L01 & MH-18-L01 & MH-17L01
Line 1 Zone 4B Division 31 27-Dec-2017 28-Dec-2017 10:30 AM 30-Dec-2017 A Approved Closed
Concrete Sampling Testing & Placement Inspection for RC Slab on
3078 KHEP-CI-3078
Grade Axis G,N Cluster 1 A6
Cluster 01 A6 NA Division 3 27-Dec-2017 28-Dec-2017 9:00 AM 30-Dec-2017 A Approved Closed

Concrete Sampling Testing & Placement Inspection for RC Footing Cluster 32


3079 KHEP-CI-3079
Cluster 32 BC6 BC6
NA Division 3 27-Dec-2017 28-Dec-2017 9:00 AM 30-Dec-2017 A Approved Closed

Cast In Place Concrete Form Work Inspection for RC Column First


3080 KHEP-CI-3080
Floor Cluster 58 B2
Cluster 58 B2 NA Division 3 27-Dec-2017 28-Dec-2017 10:00 AM 30-Dec-2017 E Rejected Closed

Cast In Place Concrete Form Work Inspection for RC Column First


3080.1 KHEP-CI-3080-01
Floor Cluster 58 B2
Cluster 58 B2 NA Division 3 30-Dec-2017 31-Dec-2017 10:00 AM 2-Jan-2018 A Approved Closed

Cast In Place Concrete Form Work Inspection for RC Column First


3081 KHEP-CI-3081
Floor Cluster 73 B2
Cluster 73 B2 NA Division 3 27-Dec-2017 28-Dec-2017 10:15 AM 30-Dec-2017 A Approved Closed

2nd Coat Damp Proofing Installation Inspection for RC Footing & Cluster 47
3082 KHEP-CI-3082
Cloumn Neck Cluster 47 BC6 BC6
NA Division 7 27-Dec-2017 28-Dec-2017 10:30 AM 30-Dec-2017 A Approved Closed

Cast In Place Concrete Form Work Inspection for RC Footing Cluster 80


3083 KHEP-CI-3083
Foundation Cluster 80 BC6 BC6
NA Division 3 27-Dec-2017 28-Dec-2017 10:45 AM 31-Dec-2017 A Approved Closed

Installation of Rein forcement steel bar Embedded item & Closure Cluster 80 Approved w/
3084 KHEP-CI-3084
Inspection for RC Footing Foundation Cluster 80 BC6 BC6
NA Division 3 27-Dec-2017 28-Dec-2017 11:00 AM 31-Dec-2017 B comments
Closed

Dam Proofing Surface Preparation for RC Footing & RC Cloumn Neck Cluster 49
3085 KHEP-CI-3085
Cluster 49 BC6 BC6
NA Division 7 27-Dec-2017 28-Dec-2017 2:30 AM 30-Dec-2017 A Approved Closed

Compaction test of sand filling up to the pipe 1st layer around


3086 KHEP-CI-3086 manhole - sewer main line Zone 1B ,Line 15 MH-47-L15 & MH-48- Line 15 Zone 1B Division 31 27-Dec-2017 28-Dec-2017 11:00 AM 30-Dec-2017 A Approved Closed
L15 -MH-49-L15 MH-52-L-15 - MH-51-L15
Blinding Concrete sampling testing & Placement Inspection for
Line Approved w/
3087 KHEP-CI-3087 Manhole Sewer Main Line Zone 2B Line 27,28,29,30 MH-1-A-L21 MH-
27,28,29,30
Zone 2B Division 31 27-Dec-2017 28-Dec-2017 11:30 AM 30-Dec-2017 B comments
Closed
1-L28 MH-1-A-L30 & MH-1-L27
Dam Proofing Surface Preparation for RC Footing & Cloumn Neck Cluster 38
3088 KHEP-CI-3088
Cluster 38 BC6 BC6
NA Division 7 27-Dec-2017 28-Dec-2017 2:00 PM 30-Dec-2017 A Approved Closed

Compaction test general Fill Around Manhole 1st Layer Sewer main
3089 KHEP-CI-3089 Line Zone 1B Line 6,7,8 MH-4-L08 & MH-3-L08 MH-2-L08 MH-1-L07 Line 6,7,8 Zone 1B Division 31 28-Dec-2017 30-Dec-2017 11:00 AM 1-Jan-2018 A Approved Closed
MH-1-L06

Compaction test of Sand Filling above the pipe & laying Warning tape
3090 KHEP-CI-3090
around Manhole Storm Main Line Zone 1B Line 10 MH-I31-L10
Line 10 Zone 1B Division 31 28-Dec-2017 30-Dec-2017 11:00 AM 1-Jan-2018 A Approved Closed

Inspection of Gravel bedding installation under trench with geotextile


3091 KHEP-CI-3091 protection sheet sewer main line Dia 200mm Zone 1B Line 2 MH-7- Line 2 Zone 1B Division 31 28-Dec-2017 30-Dec-2017 11:00 AM 31-Dec-2017 A Approved Closed
L02 to MH-6-L02 MH-6-L02 to MH-5-L02
Inspection Form work for base & wall concrete Pouring for Storm
Line
Manholes Zone 3B, 4B, 5C Line 18,24,26,34,38 MH-64-L18 & MH-75- Zone 3B, 4B,
3092 KHEP-CI-3092
L18 MH-95-L24 & MH120-L26 MH-129L34 & MH130-L34 & MH-135-
18,24,26,34,3
5C
Division 33 28-Dec-2017 30-Dec-2017 2:00 PM 31-Dec-2017 A Approved Closed
8
L38
Box Closing & Grouting for storm embedded pice at Manhole Zone
3093 KHEP-CI-3093 2B, Line 07,33 MH-I22-L33 one side MH-I23-L33 two side MH-27- Line 07,33 Zone 2B Division 33 28-Dec-2017 30-Dec-2017 10:30 AM 1-Jan-2018 E Rejected Closed
L07 one side
Box Closing & Grouting for storm embedded pice at Manhole Zone
3093.1 KHEP-CI-3093-01 2B, Line 07,09 MH-I22-L09 one side MH-I23-L09 two side MH-27- Line 07,09 Zone 2B Division 33 7-Jan-2018 8-Jan-2018 10:30 AM 9-Jan-2018 E Rejected Closed
L07 one side
Box closing & Grouting for storm embedded pice at Manhole Zone 2B
3093.2 KHEP-CI-3093-02 Line 07,09 MH-I22-L09 one side MH-I23-L09 two side MH-27-L07 Line 07,09 Zone 2B Division 33 13-Jan-2018 14-Jan-2018 10:30 AM 15-Jan-2018 A Approved Closed
one side
Inspection Form work & concrete Pouring for sewer Back Drop pice
3094 KHEP-CI-3094 from IC to MH 160mm at Manhole first Stage Zone 1B Line 2 MH-5- Line 2 Zone 1B Division 33 28-Dec-2017 30-Dec-2017 2:30 PM 1-Jan-2018 A Approved Closed
A-L02 & MH3-L02
Compaction Test Around Footing General fill 4th layer Zone 2B Cluster 39
3095 KHEP-CI-3095
Cluster 39 BC6 BC6
Zone 2B Division 31 28-Dec-2017 30-Dec-2017 2:30 PM 1-Jan-2018 A Approved Closed

Compaction Test Around Footing General fill 4th layer Zone 2B Cluster 40
3096 KHEP-CI-3096
Cluster 40 BC4 BC4
Zone 2B Division 31 28-Dec-2017 30-Dec-2017 2:30 PM 1-Jan-2018 A Approved Closed

Compaction Test first & Final layer Stuctural fill 4th layer Zone 4B Cluster 70 Approved w/
3097 KHEP-CI-3097
Cluster 70 BC4 BC4
Zone 4B Division 31 28-Dec-2017 30-Dec-2017 2:30 PM 1-Jan-2018 B comments
Closed

First Coat Damproofing Installation Inspection for Grade Beam from


3098 KHEP-CI-3098
inside Cluster 17 B2
Cluster 17 B2 NA Division 7 28-Dec-2017 30-Dec-2017 10:00 AM 31-Dec-2017 A Approved Closed

First Coat Damproofing Installation Inspection for Grade Beam from


3099 KHEP-CI-3099
inside Cluster 20 B2
Cluster 20 B2 NA Division 7 28-Dec-2017 30-Dec-2017 10:00 AM 31-Dec-2017 A Approved Closed

Cast In Place concrete Form work Insoection for RC first Floor Slab &
3100 KHEP-CI-3100
Stair Cluster 34 B2
Cluster 34 B2 NA Division 3 28-Dec-2017 30-Dec-2017 10:30 AM 31-Dec-2017 A Approved Closed

Installation of Reinforcing steel bar Embedded item & form Closure


3101 KHEP-CI-3101
Inspection for RC First Floor Slab & Stair Cluster 34 B2
Cluster 34 B2 NA Division 3 28-Dec-2017 30-Dec-2017 10:30 AM 31-Dec-2017 A Approved Closed
Inspection of Pre Back Filling for around Manhole Storm Main Line
3102 KHEP-CI-3102
Zone 2B Line 8 MH-21
Line 8 Zone 2B Division 31 28-Dec-2017 30-Dec-2017 11:00 AM 1-Jan-2018 E Rejected Closed

Inspection of Pre Back Filling for Around Manhole Storm main Line
3102.1 KHEP-CI-3102-01
Zone 2B Line 8 MH-21-L08 MH-26-L08 MH-26A-L08
Line 8 Zone 2B Division 31 4-Jan-2018 6-Jan-2018 11:00 AM 9-Jan-2018 E Rejected Closed

Installation of Reinforcing steel bar Embedded item & Closure Cluster 60


3103 KHEP-CI-3103
Inspection for RC Column Ground Floor Cluster 60 BC4 BC4
NA Division 3 28-Dec-2017 30-Dec-2017 11:00 AM 31-Dec-2017 A Approved Closed

Damp Roofing Surface Preparation for RC Grade Beams Internal face


3104 KHEP-CI-3104
only Inside the Building Cluster 75 B2
Cluster 75 B2 NA Division 3 30-Dec-2017 31-Dec-2017 10:30 AM 1-Jan-2018 A Approved Closed

First Coat Damproofing Installation Inspection for CMU Morter &


Cluster 75
3105 KHEP-CI-3105 Masonary Inspection Under Exterior Reinforced Grade Beam Cluster
BC4
NA Division 3 30-Dec-2017 31-Dec-2017 10:45 AM 1-Jan-2018 A Approved Closed
75 BC4
Check the Servey work Elevation & Coordinate for Blinding under Cluster 57
3106 KHEP-CI-3106
Footing Foundation Cluster 57 BC4 BC4
NA Division 1 30-Dec-2017 31-Dec-2017 9:30 AM 2-Jan-2018 A Approved Closed

Cast in place concrete form work inspection for RC Cloumn Ground Cluster 23,
3107 KHEP-CI-3107
Floor Cluster 23, BC4 BC4
NA Division 3 30-Dec-2017 31-Dec-2017 10:30 AM 1-Jan-2018 A Approved Closed

Installation of Reinforcing steel bar Embedded item & form Closure Cluster 22
3108 KHEP-CI-3108
Inspection for RC Column Ground Floor Cluster 22 BC4 BC4
NA Division 3 30-Dec-2017 31-Dec-2017 10:30 AM 1-Jan-2018 A Approved Closed

Concrete Sampling Testing & Placement Inspection for RC Column


3109 KHEP-CI-3109
First Floor Cluster 6 BC4
Cluster 6 BC4 NA Division 3 30-Dec-2017 31-Dec-2017 9:00 AM 1-Jan-2018 A Approved Closed

Check the Servey work Elevation & Coordinate for Blinding under Cluster 42
3110 KHEP-CI-3110
Grade Beam Cluster 42 BC4 BC4
NA Division 3 30-Dec-2017 31-Dec-2017 2:00 PM 1-Jan-2018 A Approved Closed

Cast in place concrete form work inspection for RC Roof Slab Cluster
3111 KHEP-CI-3111
3, A6
Cluster 3, A6 NA Division 3 30-Dec-2017 31-Dec-2017 10:00 AM 1-Jan-2018 A Approved Closed

Installation of Reinforcing steel bar Embedded item & form Closure


3112 KHEP-CI-3112
Inspection for RC Roof Slab Cluster 3 A6
Cluster 3 A6 NA Division 3 30-Dec-2017 31-Dec-2017 10:00 AM 1-Jan-2018 A Approved Closed

Cast in place concrete form work inspection for RC Slabs & RC Approved w/
3113 KHEP-CI-3113
Beams Roof Floor Cluster 48, B2
Cluster 48, B2 NA Division 3 30-Dec-2017 31-Dec-2017 11:00 AM 2-Jan-2018 B comments
Closed

Installation of Reinforcing steel bar Embedded item & form Closure Approved w/
3114 KHEP-CI-3114
Inspection for RC RC Slabs & RC Beams Roof Floor Cluster 48, B2
Cluster 48, B2 NA Division 3 30-Dec-2017 31-Dec-2017 11:30 AM 2-Jan-2018 B comments
Closed

First Coat Damproofing Installation Inspection for CMU Morter &


Cluster 26
3115 KHEP-CI-3115 Masonary Inspection Under Exterior Reinforced Grade Beam Cluster
BC4
NA Division 3 30-Dec-2017 31-Dec-2017 2:00 PM 1-Jan-2018 A Approved Closed
26 BC4

3116 KHEP-CI-3116 Compaction Test Around Footing General Fill 5th Layer Cluster 77 Cluster 77 Zone 4B Division 31 30-Dec-2017 31-Dec-2017 2:00 PM 1-Jan-2018 A Approved Closed

Compaction Test of Sanding Bedding under Pipe Tranch Portable &


3117 KHEP-CI-3117 Fire Fighting Dia 160mm Zone 1B P 109,111 ISO-61-P111 to ISO-60- P 109, 111 Zone 1B Division 31 30-Dec-2017 31-Dec-2017 11:30 AM 1-Jan-2018 A Approved Closed
P109
Second Coat Dam proofing Installation Inspection for Grade Beam
3118 KHEP-CI-3118
From Inside Cluster 17 B2
Cluster 17 B2 NA Division 7 31-Dec-2017 1-Jan-2018 10:00 AM 2-Jan-2018 A Approved Closed

Second Coat Dam proofing Installation Inspection for Grade Beam


3119 KHEP-CI-3119
From Inside Cluster 20 B2
Cluster 20 B2 NA Division 7 31-Dec-2017 1-Jan-2018 10:00 AM 2-Jan-2018 A Approved Closed

Installation of Reinforcing steel bar Embedded item & form Closure


3120 KHEP-CI-3120
Inspection for RC Column First Floor Cluster 4 A6
Cluster 4 A6 NA Division 3 31-Dec-2017 1-Jan-2018 10:00 AM 2-Jan-2018 A Approved Closed

Concrete Sampling Testing & Placement Inspection for RC Roof Slab


3121 KHEP-CI-3121
Cluster 20 B2
Cluster 20 B2 NA Division 3 31-Dec-2017 1-Jan-2018 9:00 AM 2-Jan-2018 A Approved Closed

Concrete Sampling Testing & Placement Inspection for RC Column


3122 KHEP-CI-3122
First Floor Cluster 33 B2
Cluster 33 B2 NA Division 3 31-Dec-2017 1-Jan-2018 9:00 AM 2-Jan-2018 A Approved Closed

Second Coat Dam proofing Installation Inspection for CMU Morter &
Cluster 74
3123 KHEP-CI-3123 Masonry Inspection Under Exterior Reinforced Grade Beam Cluster
BC4
NA Division 7 31-Dec-2017 1-Jan-2018 10:30 AM 2-Jan-2018 A Approved Closed
74 BC4
First Coat Dam proofing Installation Inspection for CMU Morter &
Cluster 76
3124 KHEP-CI-3124 Masonary Inspection Under Exterior Reinforced Grade Beam Cluster
BC4
NA Division 7 31-Dec-2017 1-Jan-2018 10:40 AM 2-Jan-2018 A Approved Closed
76 BC4
Concrete Sampling Testing & Placement Inspection for RC Footing Cluster 80 Approved w/
3125 KHEP-CI-3125
Cluster 80 BC6 BC6
NA Division 3 31-Dec-2017 1-Jan-2018 9:30 AM 2-Jan-2018 B comments
Closed

Concrete Sampling Testing & Placement Inspection for RC Column Approved w/


3126 KHEP-CI-3126
First Floor Cluster 73 B2
Cluster 73 B2 NA Division 3 31-Dec-2017 1-Jan-2018 9:30 AM 2-Jan-2018 B comments
Closed

Concrete Sampling Testing & Placement Inspection for RC Footing Cluster 53 Approved w/
3127 KHEP-CI-3127
Cluster 53 BC6 BC6
NA Division 3 31-Dec-2017 1-Jan-2018 9:30 AM 2-Jan-2018 B comments
Closed

Concrete Sampling Testing & Placement Inspection for RC Stair Approved w/


3128 KHEP-CI-3128
Ground Floor Cluster 64 B2
Cluster 64 B2 NA Division 3 31-Dec-2017 1-Jan-2018 9:30 AM 2-Jan-2018 B comments
Closed

Compaction Test General fill Around Manhole 1st layer Strom Main
3129 KHEP-CI-3129
Line Zone 1B Line 10 MH-I31-L10
Line 10 Zone 1B Division 31 31-Dec-2017 1-Jan-2018 11:00 AM 2-Jan-2018 A Approved Closed

Cast In Place Concrete Form Work Inspection for RC Grade Beam Cluster 24
3130 KHEP-CI-3130
Cluster 24 BC4 BC4
NA Division 3 31-Dec-2017 1-Jan-2018 10:30 AM 2-Jan-2018 A Approved Closed
Installation of Reinforcing steel bar Embedded item & form Closure Cluster 24
3131 KHEP-CI-3131
Inspection for RC Grade Beam Cluster 24 BC4 BC4
NA Division 3 31-Dec-2017 1-Jan-2018 10:30 AM 2-Jan-2018 A Approved Closed

Compaction test general fill Around Manhole 2nd layer Sewer main
3132 KHEP-CI-3132
line Zone 1B Line 6,7,8 MH-4-L08 & MH-3-L08 MH-1-L06 MH-1-L07
Line 6,7,8 Zone 1B Division 31 31-Dec-2017 1-Jan-2018 11:00 AM 2-Jan-2018 A Approved Closed

Inspection of laying warning tape Installation Sewer main line Dia Ø


3133 KHEP-CI-3133 200mm Zone 1B Line 1 MH-8-L01 to MH-7-L01 - MH-7-L01 to MH-6- Line 1 Zone 1B Division 31 31-Dec-2017 1-Jan-2018 10:30 AM 2-Jan-2018 A Approved Closed
L01

Inspection of excavated and Compaction formation for Sewer


3134 KHEP-CI-3134 Manholes ٍSewer main line Zone 2B Line 2 MH-10-L02 MH-11-L02 & Line 2 Zone 2B Division 31 31-Dec-2017 1-Jan-2018 11:30 AM 2-Jan-2018 A Approved Closed
MH-12-L02 MH-13-L02 & MH-14-L02 & MH-15-L02

Inspection of Reinforcement steel bar and internal shutter for Storm


Catch Basin Precast yard Zone 1B, 4B Line 7 CB-109 At MH-20-L07
And CB-130 &CB-131 At MH-17-L07 And CB-115 At MH-28-L07 Approved w/
3135 KHEP-CI-3135
CB-116 & CB-117 At MH-29-L07 And CB-118 & CB-119 At
Line 7 Zone 1B, 4B Division 33 31-Dec-2017 1-Jan-2018 10:30 AM 2-Jan-2018 B comments
Closed
MH-29a-L15 CB-123 & CB-124 & CB-122 At MH-18-L07 & CB-127
At MH-21-L07
Compaction test of Sand filling above the pipe and laying warning
tape Around Manhole Storm main Line Zone 1B Line 15 MH-47-L15 -
3136 KHEP-CI-3136
MH-48-L15 - MH-49-L15 And MH-51-L15 - MH-50-L15 And MH-52-
Line 15 Zone 1B Division 33 31-Dec-2017 1-Jan-2018 11:00 AM 2-Jan-2018 A Approved Closed
L15
Concrete Sampling Testing & Placement Inspection for RC Column Approved w/
3137 KHEP-CI-3137
Ground Floor Cluster 30 B2
Cluster 30 B2 NA Division 3 1-Jan-2018 2-Jan-2018 9:00 AM 3-Jan-2018 B comments
Closed

Concrete Sampling Testing & Placement Inspection for RC First Floor Approved w/
3138 KHEP-CI-3138
Slab & Stair Cluster 34 B2
Cluster 34 B2 NA Division 3 1-Jan-2018 2-Jan-2018 9:00 AM 3-Jan-2018 B comments
Closed

Installation of Reinforcing steel bar Embedded item & form Closure


3139 KHEP-CI-3139
Inspection for RC Column First Floor Cluster 34 B2
Cluster 34 B2 NA Division 3 1-Jan-2018 2-Jan-2018 2:00 PM 3-Jan-2018 A Approved Closed

Cast In Place Concrete Form Work Inspection for RC First Floor Slab Approved w/
3140 KHEP-CI-3140
& Stair Cluster 35 B2
Cluster 35 B2 NA Division 3 1-Jan-2018 2-Jan-2018 10:30 AM 4-Jan-2018 B comments
Closed

Installation of Reinforcing steel bar Embedded item & form Closure Approved w/
3141 KHEP-CI-3141
Inspection for RC First Floor Slab & Stair Cluster 35 B2
Cluster 35 B2 NA Division 3 1-Jan-2018 2-Jan-2018 10:30 AM 4-Jan-2018 B comments
Closed

Installation of Reinforcing steel bar Embedded item & form Closure Cluster 32 Approved w/
3142 KHEP-CI-3142
Inspection for RC Column Neck Cluster 32 BC6 BC6
NA Division 3 1-Jan-2018 2-Jan-2018 10:00 AM 4-Jan-2018 B comments
Closed

First Coat Dam proofing Installation Inspection for CMU Morter &
Cluster 79
3143 KHEP-CI-3143 Masonary Inspection Under Exterior Reinforced Grade Beam Cluster
BC4
NA Division 7 1-Jan-2018 2-Jan-2018 9:30 AM 3-Jan-2018 A Approved Closed
79 BC4
Second Coat Dam proofing Installation Inspection for CMU Morter &
Cluster 76
3144 KHEP-CI-3144 Masonary Inspection Under Exterior Reinforced Grade Beam Cluster
BC4
NA Division 7 1-Jan-2018 2-Jan-2018 9:35 AM 10-Jan-2018 A Approved Closed
76 BC4
Dam Proofing Surface Preparation for RC Grade Beams Internal Face
3145 KHEP-CI-3145
Only Inside the Building Cluster 68 B2
Cluster 68 B2 NA Division 7 1-Jan-2018 2-Jan-2018 9:40 AM 3-Jan-2018 A Approved Closed

Dam Proofing Surface Preparation for RC Footing & RC Column Cluster 62


3146 KHEP-CI-3146
Necks Cluster 62 BC6 BC6
NA Division 7 1-Jan-2018 2-Jan-2018 2:00 PM 3-Jan-2018 A Approved Closed

Cast In Place Concrete Form Work Inspection for RC First Floor Slab Approved w/
3147 KHEP-CI-3147
& Stair Cluster 81 A6
Cluster 81 A6 NA Division 3 1-Jan-2018 2-Jan-2018 10:00 AM 4-Jan-2018 B comments
Closed

Installation of Reinforcing steel bar Embedded item & form Closure Approved w/
3148 KHEP-CI-3148
Inspection for RC First Floor Slab & Stair Ground Floor Cluster 81 A6
Cluster 81 A6 NA Division 3 1-Jan-2018 2-Jan-2018 10:30 AM 4-Jan-2018 B comments
Closed

Termite control surface preparation,installation and final inspection Cluster 57


3149 KHEP-CI-3149
for RC Footing Foundation Cluster 57 BC4 BC4
NA Division 3 1-Jan-2018 2-Jan-2018 2:30 PM 3-Jan-2018 A Approved Closed

Compaction test around footing general fill final layer Zone 2B, Cluster 40
3150 KHEP-CI-3150
Cluster 40 BC4 BC4
Zone 2B Division 31 1-Jan-2018 2-Jan-2018 2:00 AM 3-Jan-2018 A Approved Closed

Compaction test around footing general fill First layer Zone 2B, Cluster 28
3151 KHEP-CI-3151
Cluster 28 BC4 BC4
Zone 2B Division 31 1-Jan-2018 2-Jan-2018 2:00 AM 3-Jan-2018 A Approved Closed

First Coat Bituminnous damp proofing installation inspection for


storm manholes precast yard Zone 1B,4B Line 19,15 & 27 MH-115- Line 19,15 &
3152 KHEP-CI-3152
L27 MH-117-L27 & MH-66-L19 MH-57-L15 & MH-58-L15 & MH-65- 27
Zone 1B Division 33 1-Jan-2018 2-Jan-2018 2:30 AM 3-Jan-2018 A Approved Closed
L19

First Coat Bituminnous damp proofing installation inspection for Line


storm manholes precast yard Zone 2B,3b,4B & 5C Line 01,18,19,15 01,18,19,15 Zone 2B,3b,4B
3153 KHEP-CI-3153
21,26,33 & 34 MH-1-L01 and MH-73-L19 MH-79-L21 and MH-74-L18 21,26,33 & & 5C
Division 33 1-Jan-2018 2-Jan-2018 11:30 AM 3-Jan-2018 A Approved Closed
MH-118-L26 and MH-128-L34 and MH-123-L33 34
Inspection Form Work for Base & Wall & Concrete Pouring for Storm
Catch Basin Precast yard Zone 1B, 4B Line 7 CB-109 At MH-20-L07
And CB-130 &CB-131 At MH-17-L07 And CB-115 At MH-28-L07 Approved w/
3154 KHEP-CI-3154
CB-116 & CB-117 At MH-29-L07 And CB-118 & CB-119 At
Line 7 Zone 1B & 4B Division 33 1-Jan-2018 2-Jan-2018 10:30 AM 4-Jan-2018 B comments
Closed
MH-29a-L15 CB-123 & CB-124 & CB-122 At MH-18-L07 & CB-127
At MH-21-L07
Inspection of Excavated & Compaction Formation for Sewer Main
3155 KHEP-CI-3155
Line Zone 2B Line 27 & 28 MH-1-A-L28 MH-2-L27
Line 27 & 28 Zone 2B Division 31 1-Jan-2018 2-Jan-2018 11:30 AM 3-Jan-2018 A Approved Closed

Cast In Place Concrete Form Work Inspection for RC Columns Cluster 60 Approved w/
3156 KHEP-CI-3156
Ground Floor Cluster 60 BC4 BC4
NA Division 3 1-Jan-2018 2-Jan-2018 11:00 AM 4-Jan-2018 B comments
Closed

Second Coat Dam proofing Installation Inspection for CMU Morter &
Cluster 26
3157 KHEP-CI-3157 Masonary Inspection Under Exterior Reinforced Grade Beam Cluster
BC4
NA Division 7 1-Jan-2018 2-Jan-2018 10:00 AM 3-Jan-2018 A Approved Closed
26 BC4
First Coat Dam Proofing Installation Inspection for Footing & Column Cluster 29
3158 KHEP-CI-3158
Neck Cluster 29 BC4 BC4
NA Division 7 1-Jan-2018 2-Jan-2018 10:00 AM 3-Jan-2018 A Approved Closed

Cast In Place Concrete Form Work Inspection for RCSlab On Grade Approved w/
3159 KHEP-CI-3159
Axis J-N Cluster 2 A6
Cluster 02 A6 NA Division 3 1-Jan-2018 2-Jan-2018 10:30 AM 3-Jan-2018 B comments
Closed

Installation of Reinforcing steel bar Embedded item & form Closure


3160 KHEP-CI-3160
Inspection for RC Slab on Grade Axis Cluster 2 A6
Cluster 02 A6 NA Division 3 1-Jan-2018 2-Jan-2018 10:00 AM 3-Jan-2018 A Approved Closed

Surface Preparation for RC Column Ground Floor B6 for Closing Site Cluster 21
3161 KHEP-CI-3161
Instruction SI-CI-002 Cluster 21 BC4 BC4
NA Division 7 1-Jan-2018 2-Jan-2018 10:00 AM 4-Jan-2018 A Approved Closed

Second Coat Dam proofing Installation Inspection for CMU Morter &
Cluster 79
3162 KHEP-CI-3162 Masonary Inspection Under Exterior Reinforced Grade Beam Cluster
BC4
NA Division 7 2-Jan-2018 3-Jan-2018 10:00 AM 4-Jan-2018 A Approved Closed
79 BC4
First Coat Dam proofing Installation Inspection for CMU Morter &
3163 KHEP-CI-3163 Masonary Inspection Under Exterior Reinforced Grade Beam Cluster Cluster 67 A4 NA Division 7 2-Jan-2018 3-Jan-2018 10:15 AM 4-Jan-2018 A Approved Closed
67 A4
70cm CMU Morter & Masonry Insoection Under Exterior Reinforced Cluster 70
3164 KHEP-CI-3164
Grade Beam Cluster 70 BC4 BC4
NA Division 3 2-Jan-2018 3-Jan-2018 11:00 AM 4-Jan-2018 A Approved Closed

First Coat Dam proofing Installation Inspection for CMU Morter &
Cluster 78
3165 KHEP-CI-3165 Masonary Inspection Under Exterior Reinforced Grade Beam Cluster
BC4
NA Division 7 2-Jan-2018 3-Jan-2018 11:00 AM 4-Jan-2018 A Approved Closed
78 BC4
Inspection Form Work & concrete Pouring for sewer Embedded Pice
3166 KHEP-CI-3166 at Manhole Zone 1B Line 8,2 MH-7-L02 & MH-1-L08 one side MH-8- Line 8,2 Zone 1B Division 31 2-Jan-2018 3-Jan-2018 2:30 AM 4-Jan-2018 A Approved Closed
L02 two side
Inspection Form Work & concrete Pouring for sewer Back Drop From
3167 KHEP-CI-3167 IC to MH 160mm at Manhole second stage Zone 1B Line 2 MH-5-A- Line 2 Zone 1B Division 31 2-Jan-2018 3-Jan-2018 2:30 AM 6-Jan-2018 E Rejected Closed
L02 MH-4-L02 MH-3-L02
Inspection Formwork and concrete pouring for sewer Back Drop pice
3167.1 KHEP-CI-3167-01 ( From IC to MH Ø 160 mm ) at Manhole (second stage) Zone 1B Line 2 Zone 1B Division 31 13-Jan-2018 14-Jan-2018 2:30 AM 16-Jan-2018 E Rejected Closed
Line 2 MH-5-A-L02 MH-4-L02 & MH-3-L02
Inspection Formwork and concrete pouring for sewer Back Drop pice
Approved w/
3167.2 KHEP-CI-3167-02 ( From IC to MH Ø 160 mm ) at Manhole (second stage) Zone 1B Line 2 Zone 1B Division 31 17-Jan-2018 18-Jan-2018 1:30 PM 20-Jan-2018 B comments
Closed
Line 2 MH-5-A-L02 MH-4-L02 & MH-3-L02

Inspection Form Work & concrete Pouring for sewer Back Drop From
3168 KHEP-CI-3168
IC to MH 160mm at Manhole Zone 1B Line 1 MH-7-L01
Line 1 Zone 1B Division 31 2-Jan-2018 3-Jan-2018 2:30 AM 6-Jan-2018 E Rejected Closed

Compaction test around footing general fill final layer Zone 4B, Cluster 77
3169 KHEP-CI-3169
Cluster 77 BC4 BC4
Zone 4B Division 31 2-Jan-2018 3-Jan-2018 2:00 AM 4-Jan-2018 A Approved Closed

Compaction test Excavated Formation Level bottom of Foundation Cluster 59


3170 KHEP-CI-3170
Zone 3B, Cluster 59 BC6 BC6
Zone 3B Division 31 2-Jan-2018 3-Jan-2018 2:30 AM 4-Jan-2018 A Approved Closed

Compaction test general fill Around Manhole 2nd Layer Zone 1B Line
3171 KHEP-CI-3171
10 MH-I31-L10
Line 10 Zone 1B Division 31 2-Jan-2018 3-Jan-2018 11:00 AM 4-Jan-2018 A Approved Closed

Compaction test general fill Around Manhole 3rd Layer Zone 1B Line
3172 KHEP-CI-3172
6,7 & 8 MH-4-L08 MH-3-L08 MH-1-L08 MH-1-L07
Line 6,7 & 8 Zone 1B Division 31 2-Jan-2018 3-Jan-2018 11:00 AM 4-Jan-2018 A Approved Closed

Compaction test general fill Around Manhole 1nd Layer Zone 1B Line
3173 KHEP-CI-3173
6,7 & 8 MH-2-L08
Line 6,7 & 8 Zone 1B Division 31 2-Jan-2018 3-Jan-2018 11:00 AM 4-Jan-2018 A Approved Closed

Inspection for Dam Proofing Surface Preparation for Storm Manholes


Line
Precast Yard Zone Zone 3B,4B & 5C Line 18,26,36 & 37 MH-61-L18 Zone 3B,4B &
3174 KHEP-CI-3174
& MH-62-L18 MH-63-L18 & MH-119-L26 MH-92-L21 & MH133-L36 &
18,26,36 &
5C
Division 33 2-Jan-2018 3-Jan-2018 2:00 PM 4-Jan-2018 A Approved Closed
37
MH-134-L37
Concrete Sampling Testing & Placement Inspection for RC Cloumn Cluster 23 Approved w/
3175 KHEP-CI-3175
Ground Floor Cluster 23 BC4
NA Division 03 2-Jan-2018 3-Jan-2018 9:00 AM 4-Jan-2018 B comments
Closed

Termite control surface preparation,installation and final inspection Cluster 42


3176 KHEP-CI-3176
for Grade Beam Cluster 42 BC4 BC4
NA Division 03 3-Jan-2018 4-Jan-2018 9:00 AM 6-Jan-2018 A Approved Closed

Concrete Sampling Testing & Placement Inspection for RC Slab On Approved w/


3177 KHEP-CI-3177
Grade Axis J-N Cluster 2 A6
Cluster 02 A6 NA Division 03 3-Jan-2018 4-Jan-2018 9:00 AM 7-Jan-2018 B comments
Closed
Concrete Sampling Testing & Placement Inspection for RC Roof Slab Approved w/
3178 KHEP-CI-3178
Cluster 3 A6
Cluster 3 A6 NA Division 03 3-Jan-2018 4-Jan-2018 9:00 AM 7-Jan-2018 B comments
Closed

Cast In Place Concrete Form Work Inspection for RC Grade Beam Cluster 37
3179 KHEP-CI-3179
Cluster 37 BC4 BC4
NA Division 03 3-Jan-2018 4-Jan-2018 10:30 AM 6-Jan-2018 A Approved Closed

Installation of Reinforcing steel bar Embedded item & form Closure Cluster 37
3180 KHEP-CI-3180
Inspection for RC Grade Beam Cluster 37 BC6 BC6
NA Division 03 3-Jan-2018 4-Jan-2018 10:00 AM 7-Jan-2018 A Approved Closed

Form Work & Casting Grout for Column B6 Ground Floor for Closing Cluster 21
3181 KHEP-CI-3181
site Instruction no SI-CI-002 Cluster 21 BC4 BC4
NA Division 03 3-Jan-2018 4-Jan-2018 10:30 AM 6-Jan-2018 A Approved Closed

Cast In Place Concrete Form Work Inspection for RC Slab on Grade


3182 KHEP-CI-3182
Axis Cluster 2 A6
Cluster 02 A6 NA Division 03 3-Jan-2018 4-Jan-2018 2:00 AM 7-Jan-2018 A Approved Closed

Installation of Reinforcing steel bar Embedded item & form Closure


3183 KHEP-CI-3183
Inspection for RC Slab Cluster 2 A6
Cluster 02 A6 NA Division 03 3-Jan-2018 4-Jan-2018 10:00 AM 7-Jan-2018 A Approved Closed

Compaction Test around Footing General Fill 1st Layer Zone 2B Cluster 47
3184 KHEP-CI-3184
Cluster 47 BC6 BC6
NA Division 03 3-Jan-2018 4-Jan-2018 2:00 AM 7-Jan-2018 A Approved Closed

Compaction Test General Fill Main Line & Around Manhole 1st Layer
3185 KHEP-CI-3185 Storm Main Line Zone 1B Line 15 MH-47-L15 MH-48-L15 MH-94-L15 Line 15 Zone 1B Division 31 3-Jan-2018 4-Jan-2018 11:00 AM 7-Jan-2018 A Approved Closed
MH-50-L15 & MH-51-L15 MH-50-L15 & MH-52-L15
Second Coat Dam proofing Installation Inspection for footing & Cluster 29
3186 KHEP-CI-3186
Column Neck Cluster 29 BC4 BC4
NA Division 07 3-Jan-2018 4-Jan-2018 10:00 AM 6-Jan-2018 A Approved Closed

Second Coat Dam proofing Installation Inspection for CMU Morter &
3187 KHEP-CI-3187 Masonry Inspection Under Exterior Reinforced Grade Beam Cluster Cluster 67 A4 NA Division 07 3-Jan-2018 4-Jan-2018 9:45 AM 6-Jan-2018 A Approved Closed
67 A4
Second Coat Dam proofing Installation Inspection for CMU Morter &
Cluster 78
3188 KHEP-CI-3188 Masonry Inspection Under Exterior Reinforced Grade Beam Cluster
BC4
NA Division 07 3-Jan-2018 4-Jan-2018 10:00 AM 6-Jan-2018 A Approved Closed
78 BC4
Concrete Sampling Testing & Placement Inspection for RC Slab & RC Approved w/
3189 KHEP-CI-3189
Beams Roof Floor Cluster 48 B2
Cluster 48 B2 NA Division 07 3-Jan-2018 4-Jan-2018 10:00 AM 7-Jan-2018 B comments
Closed

Concrete Sampling Testing & Placement Inspection for RC Column Approved w/


3190 KHEP-CI-3190
First Floor Cluster 58 B2
Cluster 58 B2 NA Division 03 3-Jan-2018 4-Jan-2018 9:30 AM 7-Jan-2018 B comments
Closed

Blinding Concrete Sampling Testing & Placement Inspection for RC Cluster 57


3191 KHEP-CI-3191
Footing Foundation Cluster 57 BC4 BC4
NA Division 03 3-Jan-2018 4-Jan-2018 9:30 AM 7-Jan-2018 A Approved Closed

Installation of Reinforcing steel bar Embedded item & form Closure Cluster 53
3192 KHEP-CI-3192
Inspection for RC Column Neck Cluster 53 BC6 BC6
NA Division 03 3-Jan-2018 4-Jan-2018 2:00 PM 7-Jan-2018 A Approved Closed

Cast In Place Concrete Form Work Inspection for RC Grade Beam Cluster 55 Approved w/
3193 KHEP-CI-3193
Cluster 55 BC4 BC4
NA Division 03 3-Jan-2018 4-Jan-2018 2:30 PM 7-Jan-2018 B comments
Closed

Installation of Reinforcing steel bar Embedded item & form Closure Cluster 55
3194 KHEP-CI-3194
Inspection for RC Grade Beams Cluster 55 BC4 BC4
NA Division 03 3-Jan-2018 4-Jan-2018 8:45 AM 7-Jan-2018 A Approved Closed

First Coat Dam proofing Installation Inspection for Grade Beam


3195 KHEP-CI-3195
Internal Face Inside the Building Cluster 75 B2
Cluster 75 B2 NA Division 03 3-Jan-2018 4-Jan-2018 10:15 AM 7-Jan-2018 A Approved Closed

First Coat Dam proofing Installation Inspection for Grade Beam


3196 KHEP-CI-3196
Internal Face Inside the Building Cluster 68 B2
Cluster 68 B2 NA Division 03 3-Jan-2018 4-Jan-2018 10:30 AM 7-Jan-2018 A Approved Closed

Installation of Reinforcing steel bar Embedded item & form Closure Cluster 50
3197 KHEP-CI-3197
Inspection for RC Column Ground Floor Cluster 50 BC4 BC4
NA Division 03 3-Jan-2018 4-Jan-2018 11:00 AM 6-Jan-2018 A Approved Closed

Second coat Bituminous damp proofing installation inspection for


storm manholes Precast yard Zone 1B, 4B Line
Line
04,10,13,30,27,26,22,01 MH-111-L27 And MH-16-L07 And MH-3-
3198 KHEP-CI-3198
L01 And MH-18-L07 MH-116-L26 And MH-30-L04 And MH-107a-L30
04,10,13,30,2 Zone 1B, 4B Division 33 3-Jan-2018 4-Jan-2018 10:30 AM 7-Jan-2018 A Approved Closed
7,26,22,01
And MH-17-L07 MH-32-L10 And MH-59-L13 And MH-107-L30 And
MH-91-L22

Second coat Bituminous damp proofing installation inspection for


Line
storm manholes Precast yard Zone 1B, 4B Line 24,25,01,30,04,13
3199 KHEP-CI-3199
MH-93-L24 And MH-29-L07 And MH-111a-L27 MH-15-L04 And MH-
24,25,01,30,0 Zone 1B, 4B Division 33 3-Jan-2018 4-Jan-2018 10:30 AM 7-Jan-2018 A Approved Closed
4,13
60-L13 And MH-09-L01 MH-106-L30 And MH-94-L25

Compaction Test of Sand Filling up tp the Pipe 1st Layer Around


Approved w/
3200 KHEP-CI-3200 manhole Storm Main Line Zone 1B Line 8 MH-21-L08 MH-26-L08 MH- Line 8 Zone 1B Division 31 3-Jan-2018 4-Jan-2018 11:00 AM 7-Jan-2018 B comments
Closed
26A-L08
Concrete Sampling Testing & Placement Inspection for RC Grade Cluster 24
3201 KHEP-CI-3201
Beam Cluster 24 BC4 BC4
NA Division 3 4-Jan-2018 6-Jan-2018 9:00 AM 7-Jan-2018 A Approved Closed

Blinding Concrete Sampling Testing & Placement Inspection for Cluster 42


3202 KHEP-CI-3202
Grade Beam Cluster 42 BC4 BC4
NA Division 3 4-Jan-2018 6-Jan-2018 2:00 PM 7-Jan-2018 A Approved Closed

Blinding concrete sampling for Teasting & Placement Inspection for


3203 KHEP-CI-3203 Manhole Sewer Main Line MH-10-L02 MH-11-L02 & MH-12-L02 MH- Line 2 Zone 2B Division 31 4-Jan-2018 6-Jan-2018 11:30 AM 7-Jan-2018 A Approved Closed
13-L02 & MH-14-L02 & MH-15-L02 Zone 2B Line 2
Inspection for Gravel bedding Installation under S. Sewer Manhole
3204 KHEP-CI-3204 Base with geotextile Protection sheet sewer main line MH-5-L01 Zone Line 1 Zone 1B Division 31 4-Jan-2018 6-Jan-2018 10:30 AM 7-Jan-2018 A Approved Closed
1B Line 01

Compaction test general fill around Manhole final Layer Sewer Main Approved w/
3205 KHEP-CI-3205
Line MH-4-L08 & MH-3-L08 MH-1-L06 MH-1-L07 Zone 1B Line 6,7,8
Line 6,7,8 Zone 1B Division 31 4-Jan-2018 6-Jan-2018 11:00 AM 8-Jan-2018 B comments
Closed

Compaction test general fill around Manhole 2nd Layer Sewer Main Approved w/
3206 KHEP-CI-3206
Line Zone 1B Line 6,7,8 MH-2-L08
Line 6,7,8 Zone 1B Division 31 4-Jan-2018 6-Jan-2018 11:00 AM 8-Jan-2018 B comments
Closed

Compaction test general fill around Manhole 3rd Layer Storm Main
3207 KHEP-CI-3207 Line 10 Zone 1B Division 31 4-Jan-2018 6-Jan-2018 11:00 AM Open
Line Zone 1B Line 10 MH-I31-L10

Compaction test general fill around Manhole 4th Layer Sewer Main
3208 KHEP-CI-3208
Line Zone 1B Line 2 MH-9-L02 to MH-8-L02 MH-8-L02 to MH-7-L02
Line 2 Zone 1B Division 31 4-Jan-2018 6-Jan-2018 11:00 AM 9-Jan-2018 E Rejected Closed

Compaction test general fill around Manhole 4th Layer Sewer Main
3208.1 KHEP-CI-3208-01
Line Zone 1B Line 2 MH-9-L02 to MH-8-L02 MH-8-L02 to MH-7-L02
Line 2 Zone 1B Division 31 15-Jan-2018 16-Jan-2018 11:00 AM 20-Jan-2018 E Rejected Closed

Compaction test general fill around Manhole 4th Layer Sewer Main Approved w/
3208.2 KHEP-CI-3208-02
Line Zone 1B Line 2 MH-9-L02 to MH-8-L02 MH-8-L02 to MH-7-L02
Line 2 Zone 1B Division 31 28-Jan-2018 29-Jan-2018 11:00 AM 29-Jan-2018 B comments
Closed

Second Coat Dam proofing Installation Inspection for RC Grade


3209 KHEP-CI-3209
Beams Internal Face Inside the Building Cluster 75 B2
Cluster 75 B2 NA Division 7 4-Jan-2018 6-Jan-2018 10:15 AM 7-Jan-2018 A Approved Closed

Second Coat Dam proofing Installation Inspection for RC Grade


3210 KHEP-CI-3210
Beams Internal Face Inside the Building Cluster 68 B2
Cluster 68 B2 NA Division 7 4-Jan-2018 6-Jan-2018 10:30 AM 7-Jan-2018 A Approved Closed

Installation of Reinforcing steel bar Embedded item & form Closure Cluster 80
3211 KHEP-CI-3211
Inspection for RC Column Neck Cluster 80 BC6 BC6
NA Division 3 4-Jan-2018 6-Jan-2018 10:30 AM 7-Jan-2018 A Approved Closed

Check The Survey work elevation and Coodinate for blinding under Cluster 77
3212 KHEP-CI-3212
Grade Beam Cluster 77 BC4 BC4
NA Division 1 4-Jan-2018 6-Jan-2018 11:00 AM 8-Jan-2018 A Approved Closed

Installation of Reinforcing steel bar Embedded item & form Closure


3213 KHEP-CI-3213
Inspection for RC Column Ground Floor Cluster 65 A6
Cluster 65 A6 NA Division 3 4-Jan-2018 6-Jan-2018 3:00 PM 8-Jan-2018 E Rejected Closed

Installation of Reinforcing steel bar Embedded item & form Closure Approved w/
3213.1 KHEP-CI-3213-01
Inspection for RC Column Ground Floor Cluster 65 A6
Cluster 65 A6 NA Division 3 8-Jan-2018 9-Jan-2018 10:30 AM 10-Jan-2018 B comments
Closed

Concrete Sampling Testing & Placement Inspection for RC Column Cluster 60


3214 KHEP-CI-3214
Ground Floor Cluster 60 BC4 BC4
NA Division 3 4-Jan-2018 6-Jan-2018 9:30 AM 7-Jan-2018 A Approved Closed

Compaction Test around Footing general Fill 2nd layer Zone 2B Cluster 28
3215 KHEP-CI-3215
Cluster 28 BC4 BC4
Zone 2B Division 31 6-Jan-2018 7-Jan-2018 2:00 PM 9-Jan-2018 A Approved Closed

Compaction Test around Footing general Fill 4th layer Zone 2B Cluster 26
3216 KHEP-CI-3216
Cluster 26 BC4 BC4
Zone 2B Division 31 6-Jan-2018 7-Jan-2018 2:30 PM 9-Jan-2018 A Approved Closed

Cast In Place Concrete Form Work Inspection for RC Cloumn First


3217 KHEP-CI-3217
Floor Cluster 9 BC4
Cluster 9 BC4 NA Division 3 6-Jan-2018 7-Jan-2018 2:00 PM 8-Jan-2018 A Approved Closed

Installation of Reinforcing steel bar Embedded item & form Closure Cluster 24
3218 KHEP-CI-3218
Inspection for RC Column Ground Floor Cluster 24 BC4 BC4
NA Division 3 6-Jan-2018 7-Jan-2018 2:00 PM 8-Jan-2018 A Approved Closed

Compaction Test of Sand Filling above the Pipe & Laying Warning
3219 KHEP-CI-3219 tape around Manhole Storm Main Line Zone 2B Line 8 MH-21-L08 Line 8 Zone 2B Division 31 6-Jan-2018 7-Jan-2018 11:00 AM 11-Jan-2018 E Rejected Closed
Mh-26-L08 MH-26a-L08
Installation for Sewer GRP Manholes Sewer Main Line Zone 1B Line 1
3220 KHEP-CI-3220
MH-5-L01
Line 1 Zone 1B Division 31 6-Jan-2018 7-Jan-2018 10:30 AM 9-Jan-2018 A Approved Closed

Dam Proofing Surface Preparation for RC Grade Beam from Inside Approved w/
3221 KHEP-CI-3221
Cluster 19 B2
Cluster 19 B2 NA Division 7 6-Jan-2018 7-Jan-2018 2:00 PM 8-Jan-2018 B comments
Closed

Dam Proofing Surface Preparation for RC Grade Beam from Inside Approved w/
3222 KHEP-CI-3222
Cluster 27 B2
Cluster 27 B2 NA Division 7 6-Jan-2018 7-Jan-2018 2:00 PM 8-Jan-2018 B comments
Closed

Concrete Sampling Testing & Placement Inspection for RC Slab First


3223 KHEP-CI-3223
Floor & RC Stairs Ground Floor Cluster 81 A6
Cluster 81 A6 NA Division 3 6-Jan-2018 7-Jan-2018 9:30 AM 8-Jan-2018 A Approved Closed

Cast In Place Concrete Form Work Inspection for RC Slab On Grade


3224 KHEP-CI-3224
Axis A,E Cluster 2 A6
Cluster 02 A6 NA Division 3 7-Jan-2018 8-Jan-2018 10:00 AM 9-Jan-2018 A Approved Closed

Installation of Reinforcing steel bar Embedded item & form Closure


3225 KHEP-CI-3225
Inspection for RC Slab On Grade Axis A,E Cluster 2 A6
Cluster 02 A6 NA Division 3 7-Jan-2018 8-Jan-2018 10:00 AM 9-Jan-2018 A Approved Closed

Cast In Place Concrete Form Work Inspection for RC Column Neck Cluster 32
3226 KHEP-CI-3226
Cluster 32 BC6 BC6
NA Division 3 7-Jan-2018 8-Jan-2018 1:30 PM 9-Jan-2018 A Approved Closed

Concrete Sampling Testing & Placement Inspection for RC First Floor Approved w/
3227 KHEP-CI-3227
Slab & Stair Cluster 35 B2
Cluster 35 B2 NA Division 3 7-Jan-2018 8-Jan-2018 9:00 AM 9-Jan-2018 B comments
Closed

Concrete Sampling Testing & Placement Inspection for RC on Grade Approved w/


3228 KHEP-CI-3228
Axis E,J Cluster 2 A6
Cluster 02 A6 NA Division 3 7-Jan-2018 8-Jan-2018 9:00 AM 9-Jan-2018 B comments
Closed

Cast In Place Concrete Form Work Inspection for RC Column First Approved w/
3229 KHEP-CI-3229
Floor Axis G, N Cluster 4 A6
Cluster 4 A6 NA Division 3 7-Jan-2018 8-Jan-2018 10:00 AM 11-Jan-2018 B comments
Closed
Inspection of Excavated & Compaction for Sewer Manholes Sewer
3230 KHEP-CI-3230 Main Line Zone 2B Line 1 MH-9-L01 MH-10-L01 MH-11-L01 & MH- Line 1 Zone 2B Division 31 7-Jan-2018 8-Jan-2018 11:30 AM 9-Jan-2018 A Approved Closed
12-L01
Compaction Test around Footing General Fill 1st Layer Zone 2B Cluster 29
3231 KHEP-CI-3231
Cluster 29 BC4 BC4
Zone 2B Division 31 7-Jan-2018 8-Jan-2018 2:00 PM 10-Jan-2018 A Approved Closed

Inspection of gravel filling around pipe Sewer main line 200mm Zone
3232 KHEP-CI-3232
1B Line 1 MH-6-L01 to MH-5-L01
Line 1 Zone 1B Division 31 7-Jan-2018 8-Jan-2018 11:00 AM 9-Jan-2018 A Approved Closed

Installation of Reinforcing steel bar Form Work for Base for Sewer
GRP Manholes Precast yard Zone 3B & 4B Line Line
26,13,23,18,16,14,15,24,25 & 19 MH-1-A-L23 & MH-1-A-L26 & MH- 26,13,23,18,1
3233 KHEP-CI-3233
1-L16 - MH-1-L19 & MH-1-A-L25 & MH-1-A-L24 & MH-1-A-L18 - MH- 6,14,15,24,25
Zone 3B & 4B Division 33 7-Jan-2018 8-Jan-2018 1:30 PM 9-Jan-2018 A Approved Closed
1-L24 & MH-1-A-L13 & MH-1-L13 & MH-1-L18 - MH-1-L15 & MH-1-A- & 19
L14 & MH-1-L14 & MH-1-L26
Box Closing & Grouting for Storm Embedded Pice at Manhole Zone
3234 KHEP-CI-3234 2B Line 39,20 MH-136-L39 one side MH-71-L20 two side MH-70-L20 Line 39,20 Zone 2B Division 33 7-Jan-2018 8-Jan-2018 10:30 AM 9-Jan-2018 A Approved Closed
one side
First Coat Dam proofing Installation Inspection for CMU Morter &
Cluster 70
3235 KHEP-CI-3235 Masonry Inspection Under Exterior Reinforced Grade Beam Cluster
BC4
NA Division 7 7-Jan-2018 8-Jan-2018 10:00 AM 9-Jan-2018 A Approved Closed
70 BC4
Cast In Place Concrete Form Work Inspection for RC Slab & RC Approved w/
3236 KHEP-CI-3236
Beams Roof Floor Cluster 51 B2
Cluster 51 B2 NA Division 3 7-Jan-2018 8-Jan-2018 10:00 AM 10-Jan-2018 B comments
Closed

Installation of Reinforcing steel bar Embedded item & form Closure Approved w/
3237 KHEP-CI-3237
Inspection for RC Slab & RC Beams Cluster 51 B2
Cluster 51 B2 NA Division 3 7-Jan-2018 8-Jan-2018 10:15 AM 10-Jan-2018 B comments
Closed

Cast in place concrete form work inspection for RC column neck Cluster 80 Approved w/
3238 KHEP-CI-3238
Cluster 80 BC6 BC6
NA Division 3 8-Jan-2018 9-Jan-2018 10:00 AM 11-Jan-2018 B comments
Closed

Second Coat Dam proofing Installation Inspection for RC CMU morter


Cluster 70
3239 KHEP-CI-3239 & masonry inspection under exterior reinforced grade beam Cluster
BC4
NA Division 3 8-Jan-2018 9-Jan-2018 10:15 AM 11-Jan-2018 A Approved Closed
70 BC4
Concrete Sampling Testing & Placement Inspection for RC Grade Cluster 55 Approved w/
3240 KHEP-CI-3240
Beam Cluster 55 BC4 BC4
NA Division 3 8-Jan-2018 9-Jan-2018 9:30 AM 11-Jan-2018 B comments
Closed

First Coat Dam proofing Installation Inspection for RC footing & RC Cluster 49
3241 KHEP-CI-3241
Column Neck Cluster 49 BC6 BC6
NA Division 7 8-Jan-2018 9-Jan-2018 10:30 AM 15-Jan-2018 A Approved Closed

Compaction test 1st & final Layer Structural fill selected fill Cluster Cluster 59
3242 KHEP-CI-3242
59 BC6 - Zone 3B BC6
Zone 3B Division 31 8-Jan-2018 9-Jan-2018 11:00 AM 11-Jan-2018 A Approved Closed

Box Closing & Grounding for storm embedded pice at manhole Zone
3243 KHEP-CI-3243
2B Line 39,20
Line 39,20 Zone 2B Division 33 8-Jan-2018 9-Jan-2018 10:30 AM 11-Jan-2018 A Approved Closed

Inspection of Reinforcement steel bar and internal shutter for Storm


Catch Basin Precast yard Line 07,18,01,35 Zone 2B CB-146 At MH-
61-L18 And CB-144 &CB-145 At MH-132-L35 And CB-138 At MH- Line
3244 KHEP-CI-3244
2-L01 CB-142 & CB-143 At MH-6-L01 & CB-141 & CB-140 At MH-3- 07,18,01,35
Zone 2B Division 33 8-Jan-2018 9-Jan-2018 1:30 PM 11-Jan-2018 A Approved Closed
L01 CB-134 & CB-135 At MH-1-L01 & CB-132 & CB-133 At MH-16-
L07
Concrete Sampling testing & placement inspection for RC grade Cluster 37 Approved w/
3245 KHEP-CI-3245
Beam Cluster 37 BC4 BC4
NA Division 3 8-Jan-2018 9-Jan-2018 9:00 AM 11-Jan-2018 B comments
Closed

Damp Roofing Surface Preparation for RC footing & Column Neck


3246 KHEP-CI-3246
Cluster 31 B2
Cluster 31 B2 NA Division 7 9-Jan-2018 10-Jan-2018 10:00 AM 13-Jan-2018 A Approved Closed

First Coat Dam Proofing Installation Inspection for Grade Beam From Approved w/
3247 KHEP-CI-3247
Inside Cluster 27 B2
Cluster 27 B2 NA Division 7 9-Jan-2018 10-Jan-2018 10:00 AM 11-Jan-2018 B comments
Closed

First Coat Dam Proofing Installation Inspection for Grade Beam From Approved w/
3248 KHEP-CI-3248
Inside Cluster 19 B2
Cluster 19 B2 NA Division 7 9-Jan-2018 10-Jan-2018 10:00 AM 11-Jan-2018 B comments
Closed

Concrete Sampling testing & placement inspection for RC Column Cluster 32 Approved w/
3249 KHEP-CI-3249
Neck Cluster 32 BC6 BC6
NA Division 3 9-Jan-2018 10-Jan-2018 9:00 AM 11-Jan-2018 B comments
Closed

Second Coat Dam Proofing Installation Inspection for Footing & Cluster 49
3250 KHEP-CI-3250
Column neck Cluster 49 BC6 BC6
NA Division 7 9-Jan-2018 10-Jan-2018 2:00 PM 11-Jan-2018 A Approved Closed

Dam Proofing Surface Preparation for RC Grade Beams Internal Face


3251 KHEP-CI-3251
Only Inside the Building Cluster 48 B2
Cluster 48 B2 NA Division 7 9-Jan-2018 10-Jan-2018 10:00 AM 11-Jan-2018 A Approved Closed

Check the survey work elevation & coordinate for blinding under Cluster 40
3252 KHEP-CI-3252
Grade Beam Cluster 40 BC4 BC4
NA Division 3 9-Jan-2018 10-Jan-2018 2:00 PM 11-Jan-2018 A Approved Closed

Compaction test around footing general fill final layer Zone 2B Cluster 26
3253 KHEP-CI-3253
Cluster 26 BC4 BC4
Zone 2B Division 31 9-Jan-2018 10-Jan-2018 2:00 PM 13-Jan-2018 A Approved Closed

Compaction test around footing general fill 4th layer Zone 2B Cluster Cluster 28
3254 KHEP-CI-3254
28 BC4 BC4
Zone 2B Division 31 9-Jan-2018 10-Jan-2018 2:00 PM 13-Jan-2018 A Approved Closed

First coat, Bituminous damp proofing installation inspection for sewer


Manhole base Precast yard Zone 2B & 3B & 4B Line 2 MH-10-L02
Zone 2B &
3255 KHEP-CI-3255 And MH-12-L02 MH-19-L02 And MH-20-L02 And MH-13-L02 MH-21-
3B & 4B
Line 2 Division 33 9-Jan-2018 10-Jan-2018 9:00 AM 11-Jan-2018 A Approved Closed
L02 And MH-22-L02 And MH-11-L02 MH-18-L02 And MH-15-L02 And
MH-17-L02 And MH-14-L02
Check the survey work elevation & coordinate for blinding under Cluster 41
3256 KHEP-CI-3256
Grade Beam Cluster 41 BC4 BC4
NA Division 3 9-Jan-2018 10-Jan-2018 2:00 PM 11-Jan-2018 A Approved Closed

Cast in Place concrete Form Work Inspection for RC Slab First Floor
3257 KHEP-CI-3257
& Stair Cluster 72 B2
Cluster 72 B2 NA Division 3 10-Jan-2018 11-Jan-2018 10:00 AM 14-Jan-2018 A Approved Closed

Installation of Reinforcing steel bar Embedded item & form Closure


3258 KHEP-CI-3258
Inspection for RC Slab First Floor & Stair Cluster 72 B2
Cluster 72 B2 NA Division 3 10-Jan-2018 11-Jan-2018 10:15 AM 14-Jan-2018 A Approved Closed

Cast in Place concrete Form Work Inspection for RC Slab First Floor
3259 KHEP-CI-3259
& RC Stair 2nd flight Cluster 54 B2
Cluster 54 B2 NA Division 3 10-Jan-2018 11-Jan-2018 8:30 AM 15-Jan-2018 E Rejected Closed

Cast in Place concrete Form Work Inspection for RC Slab First Floor
3259.1 KHEP-CI-3259-01
& RC Stair 2nd flight Cluster 54 B2
Cluster 54 B2 NA Division 3 15-Jan-2018 16-Jan-2018 9:30 AM 20-Jan-2018 E Rejected Closed

Cast in Place concrete Form Work Inspection for RC Slab First Floor
3259.2 KHEP-CI-3259-02
& RC Stair 2nd flight Cluster 54 B2
Cluster 54 B2 NA Division 3 23-Jan-2018 24-Jan-2018 9:30 AM 24-Jan-2018 A Approved Closed

Installation of Reinforcing steel bar Embedded item & form Closure


3260 KHEP-CI-3260
Inspection for RC Slab First Floor & Stair Cluster 54 B2
Cluster 54 B2 NA Division 3 10-Jan-2018 11-Jan-2018 8:45 AM 15-Jan-2018 E Rejected Closed

Installation of Reinforcing steel bar Embedded item & form Closure


3260.1 KHEP-CI-3260-01
Inspection for RC Slab First Floor & Stair 2nd flight Cluster 54 B2
Cluster 54 B2 NA Division 3 15-Jan-2018 16-Jan-2018 9:45 AM 20-Jan-2018 E Rejected Closed

Installation of Reinforcing steel bar Embedded item & form Closure Approved w/
3260.2 KHEP-CI-3260-02
Inspection for RC Slab First Floor & Stair 2nd flight Cluster 54 B2
Cluster 54 B2 NA Division 3 15-Jan-2018 16-Jan-2018 9:45 AM 23-Jan-2018 B comments
Closed

Cast in Place concrete Form Work Inspection for Footing Foundation Cluster 57
3261 KHEP-CI-3261
Cluster 57 BC4 BC4
NA Division 3 10-Jan-2018 11-Jan-2018 10:30 AM 14-Jan-2018 A Approved Closed

Installation of Reinforcing steel bar Embedded item & form Closure Cluster 57
3262 KHEP-CI-3262
Inspection for Footing Foundation Cluster 57 BC4 BC4
NA Division 3 10-Jan-2018 11-Jan-2018 10:45 AM 14-Jan-2018 A Approved Closed

Dam Proofing Surface Preparation for RC Grade Beam Internal Face


3263 KHEP-CI-3263
Only Inside the Building Cluster 61 B2
Cluster 61 B2 NA Division 3 10-Jan-2018 11-Jan-2018 9:30 AM 14-Jan-2018 A Approved Closed

Second Coat Dam Proofing Installation Inspection for Grade Beam


3264 KHEP-CI-3264
From Inside Cluster 27 B2
Cluster 27 B2 NA Division 7 10-Jan-2018 11-Jan-2018 10:00 AM 13-Jan-2018 A Approved Closed

Second Coat Dam Proofing Installation Inspection for Grade Beam


3265 KHEP-CI-3265
From Inside Cluster 19 B2
Cluster 19 B2 NA Division 7 10-Jan-2018 11-Jan-2018 10:00 AM 13-Jan-2018 A Approved Closed

Inspection of Excavated & Compaction formation for Storm Manholes


3266 KHEP-CI-3266
Main Line Zone 1B Line 15 MH-54-L15 MH-46-L15
Line 15 Zone 1B Division 31 10-Jan-2018 11-Jan-2018 11:00 AM 13-Jan-2018 A Approved Closed

Second Coat Bituminous Dam Proofing Installation Inspection for


sewer manhole base precast yard Zone 2B 3B & 4B Line 2 MH-10-
Zone 2B 3B &
3267 KHEP-CI-3267 L02 MH-12-L02 MH-19-L02 MH-20-L02 MH-13-L02 MH-21-L02- Line 02
4B
Division 33 10-Jan-2018 11-Jan-2018 10:00 AM 13-Jan-2018 A Approved Closed
MH22-L02 MH-13-L02 MH-18-L02 MH-15-L02 MH-17-L02 & MH-14-
L02
Cluster 76
3268 KHEP-CI-3268 Compaction test footing general fill 5th layer Zone 4B Cluster 76 BC4
BC4
Zone 4B Division 31 10-Jan-2018 11-Jan-2018 11:00 AM 13-Jan-2018 A Approved Closed

Compaction test Around footing general fill 5th layer Zone 4B Cluster Cluster 31
3269 KHEP-CI-3269
31 BC4 BC4
Zone 4B Division 31 10-Jan-2018 11-Jan-2018 11:00 AM 13-Jan-2018 A Approved Closed

Concrete Sampling Testing & Placement Inspection for RC Slab on Approved w/


3270 KHEP-CI-3270
Grade Axiz A,E Cluster 2 A6
Cluster 02 A6 NA Division 3 10-Jan-2018 11-Jan-2018 9:00 AM 13-Jan-2018 B comments
Closed

Cast In Place Concrete form work Inspection for RC Stair first flight Cluster 60
3271 KHEP-CI-3271
Ground Floor Cluster 60 BC4 BC4
NA Division 3 10-Jan-2018 11-Jan-2018 1:30 PM 14-Jan-2018 A Approved Closed

Installation of Reinforcing steel bar Embedded item & form Closure Cluster 60 Approved w/
3272 KHEP-CI-3272
Inspection for RC Stair First Floo rGround Floor Cluster 60 BC4 BC4
NA Division 3 10-Jan-2018 11-Jan-2018 2:00 PM 14-Jan-2018 B comments
Closed

Cast In Place Concrete form work Inspection for RC Columns Ground Cluster 50
3273 KHEP-CI-3273
Floor Cluster 50 BC4 BC4
NA Division 3 10-Jan-2018 11-Jan-2018 2:30 PM 14-Jan-2018 A Approved Closed

Installation of Reinforcing steel bar embedded item & form closure Approved w/
3274 KHEP-CI-3274
Inspection for RC Column first floor Cluster 35 B2
Cluster 35 B2 NA Division 3 11-Jan-2018 13-Jan-2018 10:00 AM 15-Jan-2018 B comments
Closed

Compaction test Around Footing general fill (4th layer) Zone 4B


3275 KHEP-CI-3275
Cluster 74
Cluster 74 NA Division 31 11-Jan-2018 13-Jan-2018 11:30 AM 15-Jan-2018 A Approved Closed

Compaction test Around Footing general fill (4th layer) Zone 4B


3276 KHEP-CI-3276
Cluster 64 A4
Cluster 64 A4 NA Division 31 11-Jan-2018 13-Jan-2018 11:00 AM 15-Jan-2018 A Approved Closed

Blinding concrete sampling, Testing & placement inspection for


3277 KHEP-CI-3277 Manhole -ٍSewer main line Zone 2B Line 27, 28 MH-1-A-L28 / MH-2- Line 27, 28 Zone 2B Division 31 11-Jan-2018 13-Jan-2018 11:30 AM 14-Jan-2018 A Approved Closed
L27
Blinding concrete sampling, Testing & placement inspection for
3278 KHEP-CI-3278 Manhole - ٍSewer main line Zone 2B Line 1 MH-10-L01 MH-11-L01 & Line 1 Zone 2B Division 31 11-Jan-2018 13-Jan-2018 10:30 AM 14-Jan-2018 A Approved Closed
MH-12-L01
Inspection of concrete pouring for Sewer GRP Manholes. (Precast
Line
yard ) Zone 3B & 4B Line 26,13,23,18,16,14,15,24,25,19 MH-1-A-
26,13,23,18,1
3279 KHEP-CI-3279 L23 MH-1-A-L26 MH-1-L16 MH-1-L19 MH-1-A-L25 MH-1-A-L24 MH-
6,14,15,24,25
Zone 3B Division 33 11-Jan-2018 13-Jan-2018 1:30 PM 14-Jan-2018 A Approved Closed
1-A-L18 MH-1-L24 MH-1-A-L13 MH-1-L13 MH-1-L18 MH-1-L15 MH-1-
,19
A-L14 MH-1-L14 MH-1-L26

Inspection of gravel bedding installation under S. Sewer Manhole


3280 KHEP-CI-3280 base with geotextile protection sheet -ٍSewer main line Zone 1 Line Line 02 Zone 2B Division 33 11-Jan-2018 13-Jan-2018 10:30 AM 14-Jan-2018 A Approved Closed
02 MH-6-L02

Compaction Test General Fill Main Line 3rd Layer Sewer Main Line
3281 KHEP-CI-3281
Zone 1B Line 2 MH-9-L02 to MH-8-L02 MH-8-L02 to MH-7-L02
Line 02 Zone 1B Division 33 11-Jan-2018 13-Jan-2018 11:00 AM 14-Jan-2018 A Approved Closed

Compaction Test General Fill Main Line 1st Layer Sewer Main Line
3282 KHEP-CI-3282
Zone 1B Line 1 MH-8-L01 to MH-7-L01 MH-7-L01 to MH-6-L01
Line 01 Zone 1B Division 31 11-Jan-2018 13-Jan-2018 11:00 AM 15-Jan-2018 A Approved Closed

First Coat Dam Proofing Installation Inspection for Footing & Cloumn
3283 KHEP-CI-3283
Neck Cluster 31 B2
Cluster 31 B2 NA Division 7 13-Jan-2018 14-Jan-2018 10:00 AM 15-Jan-2018 A Approved Closed

Cast In Place Concrete form work Inspection for RC Columns Ground Cluster 22
3284 KHEP-CI-3284
Floor Cluster 22 BC4 BC4
NA Division 3 13-Jan-2018 14-Jan-2018 10:00 AM 16-Jan-2018 E Rejected Closed

Cast In Place Concrete form work Inspection for RC Columns Ground Cluster 22
3284.1 KHEP-CI-3284-01
Floor Cluster 22 BC4 BC4
NA Division 3 17-Jan-2018 18-Jan-2018 10:00 AM 20-Jan-2018 A Approved Closed

Cast In Place Concrete form work Inspection for RC Roof Slab Cluster
3285 KHEP-CI-3285
27 B2
Cluster 27 B2 NA Division 3 13-Jan-2018 14-Jan-2018 10:00 AM 16-Jan-2018 A Approved Closed

Installation of Reinforcing steel bar embedded item & form Closure


3286 KHEP-CI-3286
Inspection for RCRoof Slab Cluster 27 B2
Cluster 27 B2 NA Division 3 13-Jan-2018 14-Jan-2018 10:00 AM 16-Jan-2018 A Approved Closed

Cast In place concrete form work inspection for RC Cloumns Ground


3287 KHEP-CI-3287
Floor Cluster 65 A6 Inside the Grid Line of G-N/1-6
Cluster 65 A6 NA Division 3 13-Jan-2018 14-Jan-2018 10:30 AM 15-Jan-2018 A Approved Closed

Concrete Sampling Testing & Placement Inspection for RC Cloumn Cluster 80 Approved w/
3288 KHEP-CI-3288
Neck Cluster 80 BC6 BC6
NA Division 3 13-Jan-2018 14-Jan-2018 9:30 AM 15-Jan-2018 B comments
Closed

Installation of Reinforcing steel bar embedded item & form Closure Approved w/
3289 KHEP-CI-3289
Inspection for RC Cloumn First Floor Cluster 81 A6
Cluster 81 A6 NA Division 3 13-Jan-2018 14-Jan-2018 2:30 PM 15-Jan-2018 B comments
Closed

Installation for Sewer GRP Manholes -ٍSewer main line Zone 2B Line
3290 KHEP-CI-3290 09,10,11 MH-1-L11 & MH-1-L10 MH-1-A-L10 & MH-1-L09 MH-3-L09 Line 09 Zone 2B Division 31 13-Jan-2018 14-Jan-2018 10:30 AM 15-Jan-2018 A Approved Closed
& MH-2-L09
Second coat, Bituminous damp proofing installation inspection for
3291 KHEP-CI-3291 storm manholes, Zone 4B Line 22 MH-83-L22 MH-84-L22 MH-87-L22 Line 22 Zone 4B Division 33 13-Jan-2018 14-Jan-2018 10:30 AM 15-Jan-2018 A Approved Closed
& MH-88-L22
Inspection Formwork for storm embedded pice at Manhole Zone 2B
&3B Line 07,09,39,20 MH-71-L20 three side & MH-I23-L09 tow side Line
3292 KHEP-CI-3292
MH-70-L20 & MH-136-L39 & MH-I22-L09 one side MH-27-L07 one 07,09,39,20
Zone 2B &3B Division 33 13-Jan-2018 14-Jan-2018 1:30 PM 15-Jan-2018 A Approved Closed
side & MH-20-L07 tow side

Inspection Formwork for base & wall and concrete pouring for Storm
Catch Basin -(Precast yard ) Zone 2B, Line 07,18,01,35 CB-146 At
Line
3293 KHEP-CI-3293 MH-61-L18 & CB-144 &CB-145 At MH-132-L35 And CB-138 At MH-2-
07,18,01,35
Zone 2B Division 33 13-Jan-2018 14-Jan-2018 1:30 PM 15-Jan-2018 A Approved Closed
L01 CB-142 & CB-143 & MH-6-L01 & CB-141 & CB-140 at MH-3-L01
CB-134 & CB-135 At MH-1-L01 & CB-132 & CB-133 at MH-16-L07

Compaction test Around Footing general fill (2nd layer) Zone 2B Cluster 29
3294 KHEP-CI-3294
Cluster 29 BC4 BC4
Zone 2B Division 31 13-Jan-2018 14-Jan-2018 2:00 PM 15-Jan-2018 A Approved Closed

Compaction test Around Footing general fill (1st layer) Zone 3B Cluster 49
3295 KHEP-CI-3295
Cluster 49 BC6 BC6
Zone 3B Division 31 13-Jan-2018 14-Jan-2018 2:00 PM 15-Jan-2018 A Approved Closed

Inspection of Reinforcement steel bar ,Formwork for base for Sewer


Line
GRP Manholes. (Precast yard ) Zone 3B & 4B Line
3296 KHEP-CI-3296
(13,02,14,16,26,23,36) MH-3-L26 MH-1-L23 MH-2-L13 MH-2-L26
13,02,14,16,2 Zone 3B & 4B Division 33 13-Jan-2018 14-Jan-2018 11:30 AM 15-Jan-2018 A Approved Closed
6,23,36
MH-1-L36 MH-16-L02 MH-2-L16 MH-3-A-L16 MH-2-L14 MH-3-L16

Concrete Sampling Testing & Placement Inspection for RC Column Approved w/


3297 KHEP-CI-3297
First Floor Cluster 9 BC4
Cluster 9 BC4 NA Division 3 14-Jan-2018 15-Jan-2018 9:00 AM 16-Jan-2018 B comments
Closed

Cast In Place Concrete form work Inspection for RC first floor slab &
3298 KHEP-CI-3298
stair Cluster 30 B2
Cluster 30 B2 NA Division 3 14-Jan-2018 15-Jan-2018 10:00 AM 20-Jan-2018 A Approved Closed

Installation of Reinforcing steel bar embedded item & form closure


3299 KHEP-CI-3299
Inspection for RC first floor slab & stair Cluster 30 B2
Cluster 30 B2 NA Division 3 14-Jan-2018 15-Jan-2018 10:00 AM 20-Jan-2018 A Approved Closed

Cast In Place Concrete form work Inspection for RC roof slab Cluster Cluster 16
3300 KHEP-CI-3300
16 BC4 BC4
NA Division 3 14-Jan-2018 15-Jan-2018 2:00 PM 20-Jan-2018 A Approved Closed

Installation of Reinforcing steel bar embedded item & form closure Cluster 16 Approved w/
3301 KHEP-CI-3301
Inspection for RC roof slab Cluster 16 BC4 BC4
NA Division 3 14-Jan-2018 15-Jan-2018 2:00 PM 20-Jan-2018 B comments
Closed
Concrete Sampling Testing & Placement Inspection for RC Slab & RC Approved w/
3302 KHEP-CI-3302
Beams Roof Floor Cluster 51 B2
Cluster 51 B2 NA Division 3 14-Jan-2018 15-Jan-2018 9:30 AM 16-Jan-2018 B comments
Closed

Concrete Sampling Testing & Placement Inspection for RC Column Cluster 50 Approved w/
3303 KHEP-CI-3303
Ground Floor Cluster 50 BC4 BC4
NA Division 3 14-Jan-2018 15-Jan-2018 9:30 AM 16-Jan-2018 B comments
Closed

Concrete Sampling Testing & Placement Inspection for RC Stairs 1st Cluster 60 Approved w/
3304 KHEP-CI-3304
flight & 4 Columns Besides the stair s Ground Floor Cluster 60 BC4 BC4
NA Division 3 14-Jan-2018 15-Jan-2018 9:30 AM 16-Jan-2018 B comments
Closed

Concrete Sampling Testing & Placement Inspection for RC Slab First Approved w/
3305 KHEP-CI-3305
floor & Stair Ground Floor Cluster 72 B2
Cluster 72 B2 NA Division 3 14-Jan-2018 15-Jan-2018 9:30 AM 16-Jan-2018 B comments
Closed

Check the Servey work elevation coodination for Blinding under Cluster 59
3306 KHEP-CI-3306
Footing Cluster 59 BC6 BC6
NA Division 3 14-Jan-2018 15-Jan-2018 10:00 AM 16-Jan-2018 A Approved Closed

Compaction test Around Footing general fill (final layer) Zone 4B Cluster 74
3307 KHEP-CI-3307
Cluster 74 BC4 BC4
Zone 4B Division 31 14-Jan-2018 15-Jan-2018 2:00 PM 20-Jan-2018 A Approved Closed

Compaction test Around Footing general fill (final layer) Zone 4B Cluster 76
3308 KHEP-CI-3308
Cluster 76 BC4 BC4
Zone 4B Division 31 14-Jan-2018 15-Jan-2018 2:00 PM 20-Jan-2018 A Approved Closed

Compaction test Around Footing general fill (final layer) Zone 4B Cluster 79
3309 KHEP-CI-3309
Cluster 79 BC4 BC4
Zone 4B Division 31 14-Jan-2018 15-Jan-2018 2:00 PM 20-Jan-2018 A Approved Closed

Compaction test general fill main line (2nd layer) Sewer main Zone
3310 KHEP-CI-3310
1B Line 1 MH-8-L01 to MH-7-L01 / MH-7-L01 to MH-6-L01
Line 1 Zone 1B Division 31 14-Jan-2018 15-Jan-2018 11:00 AM 20-Jan-2018 A Approved Closed

Inspection of exavated & compaction formation for sewer manholes


3311 KHEP-CI-3311
sewer main line Zone 2B Line 1 MH-13-L01 MH-14-L01 MH-15-L01
Line 1 Zone 2B Division 31 14-Jan-2018 15-Jan-2018 11:30 AM 20-Jan-2018 E Rejected Closed

Inspection of exavated & compaction formation for sewer manholes


3311.1 KHEP-CI-3311-01
sewer main line Zone 2B Line 1 MH-13-L01 MH-14-L01 MH-15-L01
Line 1 Zone 2B Division 31 21-Jan-2018 22-Jan-2018 11:30 AM 23-Jan-2018 A Approved Closed

Inspection of pre back filling for around manhole sewer main line
3312 KHEP-CI-3312 Zone 1B Line 33,34 MH-1-A-L34 MH-1-L34 MH-2-L34 MH-1-A-L33 & Line 33,34 Zone 1B Division 31 14-Jan-2018 15-Jan-2018 11:00 AM 20-Jan-2018 A Approved Closed
MH-1-L33
Installation Inspection of Precast Storm Drainage Manholes Zone 3B
3313 KHEP-CI-3313
Line 20 MH-69-L20 MH-68-L20
Line 20 Zone 3B Division 33 14-Jan-2018 15-Jan-2018 11:00 AM 20-Jan-2018 A Approved Closed

Concrete Sampling Testing & Placement Inspection for RC Footing Cluster 57 Approved w/
3314 KHEP-CI-3314
Foundation Cluster 57 BC4 BC4
NA Division 3 15-Jan-2018 16-Jan-2018 9:30 AM 20-Jan-2018 B comments
Closed

Concrete Sampling Testing & Placement Inspection for RC Column Approved w/


3315 KHEP-CI-3315
Ground Floor Inside the Coverage of Grid Line GN / 1-6 Cluster 65 A6
Cluster 65 A6 NA Division 3 15-Jan-2018 16-Jan-2018 9:30 AM 20-Jan-2018 B comments
Closed

Insoection of Pre back filling for around manhole sewer main line
3316 KHEP-CI-3316
Line 31 Zone 1B MH-1-A-L31 MH-1-L31 MH2-L31 MH-3-L31
Line 31 Zone 1B Division 31 15-Jan-2018 16-Jan-2018 11:00 AM 20-Jan-2018 A Approved Closed

Compaction test around footing general fill final layer Zone 4A


3317 KHEP-CI-3317
Cluster 67 A4
Cluster 67 A4 Zone 4A Division 31 15-Jan-2018 16-Jan-2018 2:00 PM 20-Jan-2018 A Approved Closed

Compaction test around footing general fill 3rd layer Zone 2B Cluster Cluster 29
3318 KHEP-CI-3318
29 BC4 BC4
Zone 2B Division 31 15-Jan-2018 16-Jan-2018 2:00 PM 20-Jan-2018 A Approved Closed

Compaction test around footing general fill 2nd layer Zone 3B Cluster Cluster 49
3319 KHEP-CI-3319
49 BC6 BC6
Zone 3B Division 31 15-Jan-2018 16-Jan-2018 2:00 PM 20-Jan-2018 A Approved Closed

Compaction test around footing general fill 2nd layer Zone 3B Cluster Cluster 47
3320 KHEP-CI-3320
47 BC6 BC6
Zone 3B Division 31 15-Jan-2018 16-Jan-2018 2:00 PM 20-Jan-2018 A Approved Closed

Inspection of Concrete pouring for sewer GRP manholes Precast yard


Line
MH-3-L26 MH-1-L23 MH-2-L13 MH-2-L26 MH-1-L36 MH-16-L02 MH-
3321 KHEP-CI-3321
2-L16 MH-3-A-L16 MH-2-L14 MH-3-L16 Zone 3B & 4B Line
13,02,14,16,2 Zone 3B & 4B Division 33 15-Jan-2018 16-Jan-2018 11:30 AM 20-Jan-2018 A Approved Closed
6,23,36
13,02,14,16,26,23,36
Intallation for sewer GRP Manholes sewer main line MH-1-A-L30 MH-
3322 KHEP-CI-3322
1-L29 MH-1-L28 Zone 2B Line 28,29,30
Line 28,29,30 Zone 2B Division 31 15-Jan-2018 16-Jan-2018 10:30 AM 20-Jan-2018 A Approved Closed

Inspection of Concrete pouring for storm embedded pice at Manhole


MH-71-L20 three side MH-I23-L09 two side MH-70-L20 MH-136-L39 Line
3323 KHEP-CI-3323
MH-I22-L09 one side MH-27-L07 one side MH-20-L07 two side Zone 7,9,39,20
Zone 2B & 3B Division 33 15-Jan-2018 16-Jan-2018 1:30 PM 20-Jan-2018 A Approved Closed
2B & 3B Line 7,9,39,20
Termite control surface preparation,installation and final inspection Cluster 59
3324 KHEP-CI-3324
for Footing Foundation Cluster 59 BC6 BC6
NA Division 3 15-Jan-2018 16-Jan-2018 8:30 AM 20-Jan-2018 A Approved Closed

Second Coat Dam Proofing Installation Inspection for Footing &


3325 KHEP-CI-3325
Cloumn Neck Cluster 31 B2
Cluster 31 B2 NA Division 7 15-Jan-2018 16-Jan-2018 10:00 AM 20-Jan-2018 A Approved Closed

Compaction test first layer for backfilling under slab on grade Cluster
3326 KHEP-CI-3326
14 B2
Cluster 14 B2 NA Division 3 15-Jan-2018 16-Jan-2018 10:00 AM 20-Jan-2018 A Approved Closed

Termite control surface preparation,installation and final inspection Cluster 40


3327 KHEP-CI-3327
for Grade Beam Cluster 40 BC4 BC4
NA Division 3 15-Jan-2018 16-Jan-2018 9:00 AM 20-Jan-2018 A Approved Closed

Termite control surface preparation,installation and final inspection Cluster 41


3328 KHEP-CI-3328
for Grade Beam Cluster 41 BC4 BC4
NA Division 3 15-Jan-2018 16-Jan-2018 9:00 AM 20-Jan-2018 A Approved Closed
Cast In Place Concrete Form Work Inspection for RC First Floor Slab Cluster 21
3329 KHEP-CI-3329
& Stair Cluster 21 BC4 BC4
NA Division 3 16-Jan-2018 17-Jan-2018 2:00 PM 20-Jan-2018 A Approved Closed

Installation of Reinforceing Steel Bar Embedded Item & Closure Cluster 21 Approved w/
3330 KHEP-CI-3330
Inspection for RC First Floor Slab & Stair Cluster 21 BC4 BC4
NA Division 3 16-Jan-2018 17-Jan-2018 2:00 PM 22-Jan-2018 B comments
Closed

Concrete Sampling testing & Placement Inspection for RC Roof Slab Approved w/
3331 KHEP-CI-3331
Cluster 27 B2
Cluster 27 B2 NA Division 3 16-Jan-2018 17-Jan-2018 9:00 AM 20-Jan-2018 B comments
Closed

Blinding Concrete Sampling testing & Placement Inspection for Grade Cluster 41 Approved w/
3332 KHEP-CI-3332
Beam Cluster 41 BC4 BC4
NA Division 3 16-Jan-2018 17-Jan-2018 10:00 AM 20-Jan-2018 B comments
Closed

Blinding Concrete Sampling testing & Placement Inspection for Grade Cluster 40 Approved w/
3333 KHEP-CI-3333
Beam Cluster 40 BC4 BC4
NA Division 3 16-Jan-2018 17-Jan-2018 10:00 AM 20-Jan-2018 B comments
Closed

Concrete Sampling Testing & Placement Inspection for RC Column Cluster 22


3334 KHEP-CI-3334
Ground Floor Cluster 22 BC4 BC4
NA Division 3 16-Jan-2018 17-Jan-2018 9:00 AM 20-Jan-2018 A Approved Closed

Cast In Place Concrete Form Work Inspection for RC Column Necks Cluster 53
3335 KHEP-CI-3335
Cluster 53 BC6 BC6
NA Division 3 18-Jan-2018 20-Jan-2018 9:45 AM 21-Jan-2018 A Approved Closed

Cast In Place Concrete Form Work Inspection for RC Column First


3336 KHEP-CI-3336
Floor Coverage Grid Line A-G 1-6 Cluster 81 A6
Cluster 81 A6 NA Division 3 16-Jan-2018 17-Jan-2018 2:00 PM 20-Jan-2018 A Approved Closed

Installation of Reinforceing Steel Bar Embedded Item & Closure Cluster 57


3337 KHEP-CI-3337
Inspection for RC Column Neck Cluster 57 BC4 BC4
NA Division 3 18-Jan-2018 20-Jan-2018 2:30 PM 21-Jan-2018 A Approved Closed

Inspection of Dam Proofing Surface Preparation for Storm Manhole


Line
Precast yard Zone 3B, 4B, 5C Line 18,24,26,34,38 MH-64-L18 & MH- Zone 3B, 4B,
3338 KHEP-CI-3338
75-L18 MH-95-L24 & MH120-L26 MH-129L34 & MH130-L34 & MH-
18,24,26,34,3
5C
Division 33 16-Jan-2018 17-Jan-2018 2:00 PM 20-Jan-2018 A Approved Closed
8
135-L38
Installation for Sewer GRP Manhole Sewer Main Line Zone 1B Line 2
3339 KHEP-CI-3339
MH-6-L02
Line 2 Zone 1B Division 31 16-Jan-2018 17-Jan-2018 10:30 AM 20-Jan-2018 A Approved Closed

Compaction Test General Fill Main Line 3rd Layer Sewer Main Line
3340 KHEP-CI-3340
Zone 1B Line 1 MH-8-L01 MH-7-L01 & MH-7-L01 MH-6-L01
Line 1 Zone 1B Division 31 16-Jan-2018 17-Jan-2018 11:00 AM 20-Jan-2018 A Approved Closed

Compaction test around footing general fill 5th Layer Cluster 78 BC4 Cluster 78
3341 KHEP-CI-3341
Zone 3B BC4
Zone 3B Division 31 16-Jan-2018 17-Jan-2018 2:00 PM 20-Jan-2018 A Approved Closed

Compaction test around footing general fill 5th Layer Cluster 70 BC4 Cluster 70
3342 KHEP-CI-3342
Zone 3B BC4
Zone 3B Division 31 16-Jan-2018 17-Jan-2018 2:00 PM 20-Jan-2018 A Approved Closed

Cast In Place Concrete Form Work Inspection for RC Slabs & RC


3343 KHEP-CI-3343
Beams Roof Floor Cluster 52, B2
Cluster 52, B2 NA Division 3 18-Jan-2018 20-Jan-2018 10:30 AM 21-Jan-2018 A Approved Closed

Installation of Reinforceing Steel Bar Embedded Item & Closure


3344 KHEP-CI-3344
Inspection for RC Slab & RC Beams Roof Floor Cluster 52 B2
Cluster 52 B2 NA Division 3 18-Jan-2018 20-Jan-2018 10:45 AM 21-Jan-2018 A Approved Closed

Cast in place concrete form work inspection for RC column first floor
3345 KHEP-CI-3345
Cluster 35 B2
Cluster 35 B2 NA Division 3 17-Jan-2018 18-Jan-2018 10:00 AM 21-Jan-2018 A Approved Closed

Cast in place concrete form work inspection for RC column first floor
3346 KHEP-CI-3346
axis A-F Cluster 4 A6
Cluster 4 A6 NA Division 3 17-Jan-2018 18-Jan-2018 2:00 PM 20-Jan-2018 A Approved Closed

Check the survey work elevation & coodinate for blinding under Cluster 26
3347 KHEP-CI-3347
grade beam Cluster 26 BC4 BC4
NA Division 3 17-Jan-2018 18-Jan-2018 10:00 AM 20-Jan-2018 A Approved Closed

Dam proofing surface preparation for RC grade beam from inside Cluster 16
3348 KHEP-CI-3348
Cluster 16 BC4 BC4
NA Division 7 17-Jan-2018 18-Jan-2018 10:00 AM 20-Jan-2018 A Approved Closed

3349 KHEP-CI-3349 Compaction test final layer under slab on grade Cluster 14 B2 Cluster 14 B2 NA Division 2 17-Jan-2018 18-Jan-2018 10:00 AM 21-Jan-2018 A Approved Closed

Compaction test first layer pre final layer for back filling under slab
3350 KHEP-CI-3350
on grade Cluster 13 B2
Cluster 13 B2 NA Division 3 17-Jan-2018 18-Jan-2018 10:00 AM 21-Jan-2018 A Approved Closed

Blinding concrete sampling testing & placement inspection for footing Cluster 59
3351 KHEP-CI-3351
foundation Cluster 59 BC6 BC6
NA Division 3 17-Jan-2018 18-Jan-2018 9:30 AM 20-Jan-2018 A Approved Closed

Inspection of Reinforcement steel bar Form work for base for Sewer
GRP Manholes (Precast yard) Zone 3B & 4B, Line Line
3352 KHEP-CI-3352 19,20,21,22,16,37,35,17 MH-2-L19 MH-3-L09 MH-1-L20 MH-1-A-L20 19,20,21,22,1 Zone 3B & 4B Division 33 17-Jan-2018 18-Jan-2018 11:00 AM 20-Jan-2018 A Approved Closed
MH-1-L21 MH-1-L22 MH-1-A-L22 MH-2-L22 MH-4-L16 MH-1-L37 MH- 6,37,35,17
1-L17 MH-1-L35

Inspection of Reinforcement steel bar Form work for base for Sewer
Line
GRP Manholes (Precast yard) Zone 3B & 4B, Line 2,25,26,1,17,23
3353 KHEP-CI-3353
MH-23-L02 MH-24-L02 MH-4-L26 MH-23-A-L02 MH-1-L25 MH-28-L01
2,25,26,1,17, Zone 3B & 4B Division 33 17-Jan-2018 18-Jan-2018 11:00 AM 20-Jan-2018 A Approved Closed
23
MH-27-L01 MH-2-L17 MH-2A-L17 MH-2-L23

Cluster 47
3354 KHEP-CI-3354 Compaction test footing general fill 3rd layer Zone 3B Cluster 47 BC6
BC6
Zone 3B Division 31 17-Jan-2018 18-Jan-2018 2:00 PM 21-Jan-2018 A Approved Closed

Cluster 49
3355 KHEP-CI-3355 Compaction test footing general fill 3rd layer Zone 3B Cluster 49 BC6
BC6
Zone 3B Division 31 17-Jan-2018 18-Jan-2018 2:00 PM 21-Jan-2018 A Approved Closed

Concrete sampling testing & placement inspection for RC first floor


3356 KHEP-CI-3356
slab & stair Cluster 30 B2
Cluster 30 B2 NA Division 3 17-Jan-2018 18-Jan-2018 9:00 AM 20-Jan-2018 A Approved Closed
Blinding Concrete Sampling testing & Placement Inspection for
3357 KHEP-CI-3357
ManholeStorm main line Line 15 Zone 1B MH-54-L15 MH-46-L15
Line 15 Zone 1B Division 31 17-Jan-2018 18-Jan-2018 11:00 AM 20-Jan-2018 A Approved Closed

Cast in place concrete form work inspection for RC grade beam Cluster 36
3358 KHEP-CI-3358
Cluster 36 BC4 BC4
NA Division 3 18-Jan-2018 20-Jan-2018 10:00 AM 21-Jan-2018 A Approved Closed

Installation of Reinforceing Steel Bar Embedded Item & Closure Cluster 36


3359 KHEP-CI-3359
Inspection for RC grade beam Cluster 36 BC4 BC4
NA Division 3 18-Jan-2018 20-Jan-2018 10:00 AM 21-Jan-2018 A Approved Closed

Installation of Reinforceing Steel Bar Embedded Item & Closure Cluster 37 Approved w/
3360 KHEP-CI-3360
Inspection for RC column ground floor Cluster 37 BC4 BC4
NA Division 3 18-Jan-2018 20-Jan-2018 2:00 PM 22-Jan-2018 B comments
Closed

Check the survey work elevation & coodinate for blinding under Cluster 76
3361 KHEP-CI-3361
grade beam Cluster 76 BC4 BC4
NA Division 1 18-Jan-2018 20-Jan-2018 10:00 AM 21-Jan-2018 A Approved Closed

Check the survey work elevation & coodinate for blinding under Cluster 79
3362 KHEP-CI-3362
grade beam Cluster 79 BC4 BC4
NA Division 1 18-Jan-2018 20-Jan-2018 10:00 AM 21-Jan-2018 A Approved Closed

Check the survey work elevation & coodinate for blinding under Cluster 74
3363 KHEP-CI-3363
grade beam Cluster 74 BC4 BC4
NA Division 1 18-Jan-2018 20-Jan-2018 10:00 AM 21-Jan-2018 A Approved Closed

Check the survey work elevation & coodinate for blinding under
3364 KHEP-CI-3364
grade beam Cluster 67 A4
Cluster 67 A4 NA Division 1 18-Jan-2018 20-Jan-2018 10:00 AM 23-Jan-2018 A Approved Closed

Cast in place concrete form work inspection for RC stairs first flight Cluster 50
3365 KHEP-CI-3365
including 8 columns beside ground floor Cluster 50 BC4 BC4
NA Division 3 18-Jan-2018 20-Jan-2018 10:00 AM 21-Jan-2018 A Approved Closed

Installation of Reinforceing Steel Bar Embedded Item & Closure Cluster 50


3366 KHEP-CI-3366
Inspection for RC stairs first flight ground floor Cluster 50 BC4 BC4
NA Division 3 18-Jan-2018 20-Jan-2018 10:15 AM 21-Jan-2018 A Approved Closed

Concrete sampling testing & placement inspection for RC column first


3367 KHEP-CI-3367
floor coverage inside of grid line A-G / 1-6 Cluster 81 A6
Cluster 81 A6 NA Division 3 18-Jan-2018 20-Jan-2018 9:30 AM 21-Jan-2018 A Approved Closed

Installation of Reinforceing Steel Bar Embedded Item & Closure


3368 KHEP-CI-3368
Inspection for RC column first floor Cluster 72 B2
Cluster 72 B2 NA Division 3 18-Jan-2018 20-Jan-2018 9:30 AM 21-Jan-2018 A Approved Closed

Compaction test around footing general fill final layer Zone 3B Cluster 78
3369 KHEP-CI-3369
Cluster 78 BC4 BC4
Zone 3B Division 31 18-Jan-2018 20-Jan-2018 2:00 PM 21-Jan-2018 A Approved Closed

Cast in place concrete form work inspection for RC column ground Cluster 24 Approved w/
3370 KHEP-CI-3370
floor Cluster 24 BC4 BC4
NA Division 3 20-Jan-2018 21-Jan-2018 10:00 AM 23-Jan-2018 B comments
Closed

Cast in place concrete form work inspection for RC grade beam Cluster 25
3371 KHEP-CI-3371
Cluster 25 BC4 BC4
NA Division 3 20-Jan-2018 21-Jan-2018 10:00 AM 22-Jan-2018 A Approved Closed

Installation of Reinforceing Steel Bar Embedded Item & Closure Cluster 25


3372 KHEP-CI-3372
Inspection for RC grade beam Cluster 25 BC4 BC4
NA Division 3 20-Jan-2018 21-Jan-2018 10:00 AM 22-Jan-2018 A Approved Closed

Concrete sampling testing & placement inspection for RC first floor Cluster 21
3373 KHEP-CI-3373
slab & stairs Cluster 21 BC4 BC4
NA Division 3 20-Jan-2018 21-Jan-2018 9:00 AM 22-Jan-2018 A Approved Closed

Concrete sampling testing & placement inspection for RC roof slab Cluster 16
3374 KHEP-CI-3374
Cluster 16 BC4 BC4
NA Division 3 20-Jan-2018 21-Jan-2018 9:00 AM 22-Jan-2018 A Approved Closed

Installation of Reinforceing Steel Bar Embedded Item & Closure Cluster 21 Approved w/
3375 KHEP-CI-3375
Inspection for RC first floor Cluster 21 BC4 BC4
NA Division 3 20-Jan-2018 21-Jan-2018 2:00 PM 22-Jan-2018 B comments
Closed

Cast in place concrete form work inspection for RC column ground


3376 KHEP-CI-3376
floor inside the grid line of A-F/1-6 Cluster 65 A6
Cluster 65 A6 NA Division 3 20-Jan-2018 21-Jan-2018 9:00 AM 21-Jan-2018 A Approved Closed

Compaction test general fill main line 4th layer sewer main line Zone
3377 KHEP-CI-3377
1B Line 1 MH-8-L01 to MH-7-L01 MH-7-L01 to MH-6-L01
Line 1 Zone 1B Division 31 20-Jan-2018 21-Jan-2018 11:00 AM 22-Jan-2018 A Approved Closed

Inspection of pre back filling for around manhole storm main line
3378 KHEP-CI-3378
Zone 1B Line 13 MH-I39-L13 MH-I40-L13 MH-I41-L13 MH-I42-L13
Line 13 Zone 1B Division 31 20-Jan-2018 21-Jan-2018 11:00 AM 23-Jan-2018 A Approved Closed

Compaction test of sand filling up to the pipe 1st layer around


3379 KHEP-CI-3379 manhole sewer main line Zone 1B Line 33,34 MH-1-L33 MH-1-A-L33 Line 33,34 Zone 1B Division 31 20-Jan-2018 21-Jan-2018 11:00 AM 22-Jan-2018 A Approved Closed
MH-2-L34 MH-1-L34 & MH-1-A-L34
Compaction test around footing general fill final layer Zone 3B Cluster 70
3380 KHEP-CI-3380
Cluster 70 BC4 BC4
Zone 3B Division 31 20-Jan-2018 21-Jan-2018 2:00 PM 22-Jan-2018 A Approved Closed

Compaction test around footing general fill first layer Zone 2B Cluster Cluster 31
3381 KHEP-CI-3381
31 BC2 BC2
Zone 2B Division 31 20-Jan-2018 21-Jan-2018 2:30 PM 22-Jan-2018 A Approved Closed

Installation of Reinforceing Steel Bar Embedded Item & Closure


3382 KHEP-CI-3382
Inspection for RC column first floor Cluster 30 B2
Cluster 30 B2 NA Division 3 20-Jan-2018 21-Jan-2018 10:00 AM 22-Jan-2018 A Approved Closed

Inspection of gravel bedding installation under trench with geotextile


3383 KHEP-CI-3383 protection sheet sewer main line Dia 200mm Zone 1B Line 2 MH-2- Line 2 Zone 1B Division 31 20-Jan-2018 21-Jan-2018 11:00 AM 23-Jan-2018 A Approved Closed
L02 to MH-2-A-L02 MH-2-A-L02 to MH-1-L02 MH-1-L02 to MH-4-L01

Installation for sewer GRP manhole sewer main line Zone 2B & 3B
3384 KHEP-CI-3384 Line 1,2 MH-10-L02 MH-11-L02 MH-14-02 MH-12-L02 MH-13-L02 Line 1,2 Zone 2B, 3B Division 31 20-Jan-2018 21-Jan-2018 10:30 AM 22-Jan-2018 A Approved Closed
MH-15-L02 MH-12-L01 MH-11-L01 MH-10-L01
Inspection of gravel bedding installation under senatary sewer
3385 KHEP-CI-3385 manhole base with geotextile protection sheet sewer main line Zone Line 1,2 Zone 1B Division 31 20-Jan-2018 21-Jan-2018 10:30 AM 23-Jan-2018 E Rejected Closed
1B Line 1,2 MH-2-L02 MH-2-A-L02 MH-1-L02 & MH-4-L01

Inspection of gravel bedding installation under senatary sewer


Approved w/
3385.1 KHEP-CI-3385-01 manhole base with geotextile protection sheet sewer main line Zone Line 1,2 Zone 1B Division 31 25-Jan-2018 27-Jan-2018 10:30 AM 29-Jan-2018 B comments
Closed
1B Line 1,2 MH-2-L02 MH-2-A-L02 MH-1-L02 & MH-4-L01

Installation of Reinforceing Steel Bar Embedded Item & Closure


3386 KHEP-CI-3386
Inspection for RC column first floor Cluster 54 B2
Cluster 54 B2 NA Division 3 21-Jan-2018 22-Jan-2018 2:00 PM 23-Jan-2018 A Approved Closed

Cast in place concrete form work inspection for RC slab & RC Beams Approved w/
3387 KHEP-CI-3387
Roof Floor Cluster 71 B2
Cluster 71 B2 NA Division 3 21-Jan-2018 22-Jan-2018 10:00 AM 24-Jan-2018 B comments
Closed

Installation of Reinforceing Steel Bar Embedded Item & Closure Approved w/


3388 KHEP-CI-3388
Inspection forRC slab & RC Beams Roof Floor Cluster 71 B2
Cluster 71 B2 NA Division 3 21-Jan-2018 22-Jan-2018 10:15 AM 24-Jan-2018 B comments
Closed

Cast in place concrete form work inspection for RC column first floor
3389 KHEP-CI-3389
Cluster 72 B2
Cluster 72 B2 NA Division 3 21-Jan-2018 22-Jan-2018 2:30 PM 23-Jan-2018 A Approved Closed

Cast in place concrete form work inspection for RC column first floor
3390 KHEP-CI-3390
coverage inside of grid line H-N/1-6 Cluster 81 A6
Cluster 81 A6 NA Division 3 21-Jan-2018 22-Jan-2018 3:00 PM 23-Jan-2018 A Approved Closed

Concrete sampling testing & placement inspection for RC column Approved w/


3391 KHEP-CI-3391
ground floor coverage inside of grid line A-F/1-6 Cluster 65 A6
Cluster 65 A6 NA Division 3 21-Jan-2018 22-Jan-2018 9:30 AM 23-Jan-2018 B comments
Closed

Concrete sampling testing & placement inspection for RC column first Approved w/
3392 KHEP-CI-3392
floor coverage inside of grid line A-G/1-6 Cluster 81 A6
Cluster 81 A6 NA Division 3 21-Jan-2018 22-Jan-2018 9:30 AM 23-Jan-2018 B comments
Closed

Dam Proofing Surface Preparation for RC Grade Beam Internal Face


3393 KHEP-CI-3393
Only Inside the Building Cluster 71 B2
Cluster 71 B2 NA Division 3 21-Jan-2018 22-Jan-2018 1:30 PM 23-Jan-2018 A Approved Closed

Compaction test first layer pre final layer for back filling under slab
3394 KHEP-CI-3394
on grade Cluster 5 B2
Cluster 5 B2 NA Division 3 21-Jan-2018 22-Jan-2018 10:00 AM 23-Jan-2018 A Approved Closed

3395 KHEP-CI-3395 Compaction test final layer under slab on grade Cluster 13 B2 Cluster 13 B2 NA Division 3 21-Jan-2018 22-Jan-2018 10:00 AM 23-Jan-2018 A Approved Closed

Concrete sampling testing & placement inspection for RC column first Approved w/
3396 KHEP-CI-3396
floor Cluster 4 A6
Cluster 4 A6 NA Division 3 21-Jan-2018 22-Jan-2018 9:00 AM 23-Jan-2018 B comments
Closed

First coat damproofing installation inspection for footing & column Cluster 38
3397 KHEP-CI-3397
neck Cluster 38 BC6 BC6
NA Division 7 21-Jan-2018 22-Jan-2018 10:00 AM 23-Jan-2018 A Approved Closed

Box closing & grouting for storm embedded pice at manhole Zone 3B
3398 KHEP-CI-3398 Line 20 MH-68-L20 two side MH-69-L20 two side MH-70-L20 one Line 20 Zone 3B Division 33 21-Jan-2018 22-Jan-2018 10:30 AM 24-Jan-2018 A Approved Closed
side
Inspection of reinforcement steel bar form work & concrete pouring
3399 KHEP-CI-3399 for protection slab 21 pic storm main line precast yard Zone 3B Line Line 27 Zone 3B Division 33 21-Jan-2018 22-Jan-2018 11:30 AM 24-Jan-2018 A Approved Closed
27 MH-I97-L27 to MH-I98-L27
Compaction test around footing general fill 4th layer Zone 3B Cluster Cluster 47
3400 KHEP-CI-3400
47 BC6 BC6
Zone 3B Division 31 21-Jan-2018 22-Jan-2018 2:00 PM 23-Jan-2018 A Approved Closed

Inspection for pre back filling for around manhole sewer main line
3401 KHEP-CI-3401 Zone 1B Line 3,4 MH-1-L04 & MH-2-L04 MH1-L03 MH-2-L03 MH-3- Line 3,4 Zone 1B Division 31 21-Jan-2018 22-Jan-2018 11:00 AM 24-Jan-2018 A Approved Closed
L03

Inspection form work & concrete pouring for sewer back drop pice Approved w/
3402 KHEP-CI-3402
from IC to MH 160mm at Manhole Zone 1B Line 3 MH-1-A-L03
Line 3 Zone 1B Division 31 21-Jan-2018 22-Jan-2018 1:30 PM 24-Jan-2018 B comments
Closed

Installation for sewer GRP manholes sewer main line Zone 1B Line
3403 KHEP-CI-3403
1,2 MH-2-L02 MH-2-A-L02 MH-1-L02 & MH-4-L01
Line 1,2 Zone 1B Division 31 21-Jan-2018 22-Jan-2018 10:30 AM 24-Jan-2018 A Approved Closed

Termite control surface preparation,installation and final inspection Cluster 26


3404 KHEP-CI-3404
for Grade Beam Cluster 26 BC4 BC4
NA Division 3 22-Jan-2018 23-Jan-2018 9:00 AM 23-Jan-2018 A Approved Closed

Termite control surface preparation,installation and final inspection


3405 KHEP-CI-3405
for slab on Grade Cluster 14 B2
Cluster 14 B2 NA Division 3 22-Jan-2018 23-Jan-2018 9:00 AM 23-Jan-2018 A Approved Closed

Concrete sampling testing & placement inspection for RC grade beam Cluster 36 Approved w/
3406 KHEP-CI-3406
Cluster 36 BC4 BC4
NA Division 3 22-Jan-2018 23-Jan-2018 9:00 AM 24-Jan-2018 B comments
Closed

Concrete sampling testing & placement inspection for RC column first Approved w/
3407 KHEP-CI-3407
floor Cluster 35 B2
Cluster 35 B2 NA Division 3 22-Jan-2018 23-Jan-2018 9:00 AM 24-Jan-2018 B comments
Closed

Second coat dam proofing installation for footing & column neck Cluster 38
3408 KHEP-CI-3408
Cluster 38 BC6 BC6
NA Division 7 22-Jan-2018 23-Jan-2018 10:00 AM 24-Jan-2018 A Approved Closed

Termite control surface preparation,installation and final inspection Cluster 79


3409 KHEP-CI-3409
for Grade Beam Cluster 79 BC4 BC4
NA Division 3 22-Jan-2018 23-Jan-2018 9:00 AM 23-Jan-2018 A Approved Closed

Termite control surface preparation,installation and final inspection Cluster 76


3410 KHEP-CI-3410
for Grade Beam Cluster 76 BC4 BC4
NA Division 3 22-Jan-2018 23-Jan-2018 9:00 AM 23-Jan-2018 A Approved Closed

Concrete sampling testing & placement inspection for RC stair first Cluster 50
3411 KHEP-CI-3411
flight including 8 columns beside Cluster 50 BC4 BC4
NA Division 3 22-Jan-2018 23-Jan-2018 9:30 AM 23-Jan-2018 A Approved Closed
Concrete sampling testing & placement inspection for RC slab &
3412 KHEP-CI-3412
beams roof floor Cluster 52 B2
Cluster 52 B2 NA Division 3 22-Jan-2018 23-Jan-2018 9:30 AM 23-Jan-2018 A Approved Closed

Compaction test first layer pre final layer for backfilling under slab on
3413 KHEP-CI-3413
grade Cluster 7 B2
Cluster 7 B2 NA Division 3 22-Jan-2018 23-Jan-2018 10:00 AM 25-Jan-2018 E Rejected Closed

Compaction test first layer pre final layer for backfilling under slab on
3414.1 KHEP-CI-3413-01
grade Cluster 7 B2
Cluster 7 B2 NA Division 3 27-Jan-2018 28-Jan-2018 10:00 AM 30-Jan-2018 A Approved Closed

Inspection reinforcement steel bar & internal shutter for storm catch
basin pre cast yard Zone 3B Line 18,20,27,39 CB-147 MH-61-L18 CB-
148,149 MH-62-L18 CB-150 CB-151 MH-63-L18 CB-152 CB153 MH- Line Approved w/
3414 KHEP-CI-3414
64-L18 CB154 CB-155 MH-136-L39 CB-156 CB-156 CB-158 MH-100- 18,20,27,39
Zone 3B Division 33 22-Jan-2018 23-Jan-2018 1:30 PM 24-Jan-2018 B comments
Closed
L27 CB-159 CB-160 MH-71-L20 CB-161 CB-162 MH-70-L20 CB-163
CB-164 CB-165 MH-68-L20 CB-166 MH-67-L20 Alongg RD 1 & 3

P(Sta 0+012
Inspection excavated & compaction formation for pipe trench water
3415 KHEP-CI-3415
line Zone 1B P(Sta 0+012 to Sta 0+100)
to Sta Zone 1B Division 31 22-Jan-2018 23-Jan-2018 11:00 AM 24-Jan-2018 A Approved Closed
0+100)
Compaction test of sandfilling & laying of around the sewer manholes
3416 KHEP-CI-3416 along alley 1,2 & 11 Zone 1B Line 31,33,34 MH-1-A-L34 MH-2-L34 Line 31,33,34 Zone 1B Division 31 22-Jan-2018 23-Jan-2018 11:00 AM 24-Jan-2018 A Approved Closed
MH-1-L33 MH-2-L31 MH-3-L31

Compaction test of sandfilling first layer around the sewer manholes Approved w/
3417 KHEP-CI-3417
along alley 1,2 & Zone 1B Line 31,34 MH-1-L34 MH-1-L31
Line 31,34 Zone 1B Division 31 22-Jan-2018 23-Jan-2018 10:30 AM 24-Jan-2018 B comments
Closed

Compaction test of sandfilling first layer around the sewer manholes


3418 KHEP-CI-3418 along alley 1,2 & Zone 1B Line 13 MH-I42-L13 MH-I41-L13 MH-I40- Line 13 Zone 1B Division 31 22-Jan-2018 23-Jan-2018 10:00 AM 24-Jan-2018 A Approved Closed
L13 MH-I39-L13

Compaction test 5th layer general fill for pipe trench sewer main line
3419 KHEP-CI-3419
along rd 04 Zone 1B Line 1 MH-8-L01 MH-7-L01 MH-7-L01 MH-6-L01
Line 1 Zone 1B Division 31 22-Jan-2018 23-Jan-2018 10:00 AM 24-Jan-2018 A Approved Closed

Inspection formworks & pouring of concrete for sewer back drop


3420 KHEP-CI-3420 from IC to MH 160mm along Rd 2 Zone 1B Line 1 MH-5-L01 MH-7- Line 1 Zone 1B Division 31 25-Jan-2018 27-Jan-2018 1:30 PM 29-Jan-2018 A Approved Closed
L01
Concrete sampling testing & placement inspection for RC grade beam Cluster 25 Approved w/
3421 KHEP-CI-3421
Cluster 25 BC4 BC4
NA Division 3 23-Jan-2018 24-Jan-2018 9:00 AM 25-Jan-2018 B comments
Closed

Blinding Concrete Sampling testing & Placement Inspection for Grade Cluster 26 Approved w/
3422 KHEP-CI-3422
Beam Cluster 26 BC4 BC4
NA Division 3 23-Jan-2018 24-Jan-2018 10:00 AM 25-Jan-2018 B comments
Closed

First coat damproofing installation inspection for grade beam inside Cluster 16
3423 KHEP-CI-3423
Cluster 16 BC4 BC4
NA Division 7 23-Jan-2018 24-Jan-2018 10:00 AM 24-Jan-2018 A Approved Closed

Cast in place concrete form work inspection for RC first floor slab & Cluster 18
3424 KHEP-CI-3424
stairs Cluster 18 BC4 BC4
NA Division 3 23-Jan-2018 24-Jan-2018 10:00 AM 29-Jan-2018 E Rejected Closed

Cast in place concrete form work inspection for RC first floor slab & Cluster 18
3424.1 KHEP-CI-3424-01
stairs Cluster 18 BC4 BC4
NA Division 3 31-Jan-2018 1-Feb-2018 10:00 AM 1-Feb-2018 A Approved Closed

Installation of Reinforceing Steel Bar Embedded Item & Closure Cluster 18


3425 KHEP-CI-3425
Inspection for RC first floor slab & stair Cluster 18 BC4 BC4
NA Division 3 23-Jan-2018 24-Jan-2018 10:00 AM 27-Jan-2018 A Approved Closed

Concrete sampling testing & placement inspection for RC column first


3426 KHEP-CI-3426
floor Cluster 72 B2
Cluster 72 B2 NA Division 3 23-Jan-2018 24-Jan-2018 9:30 AM 24-Jan-2018 A Approved Closed

Blinding Concrete Sampling testing & Placement Inspection for Grade Cluster 76
3427 KHEP-CI-3427
Beam Cluster 76 BC4 BC4
NA Division 3 23-Jan-2018 24-Jan-2018 9:30 AM 24-Jan-2018 A Approved Closed

Blinding Concrete Sampling testing & Placement Inspection for Grade Cluster 79
3428 KHEP-CI-3428
Beam Cluster 79 BC4 BC4
NA Division 3 23-Jan-2018 24-Jan-2018 9:30 AM 24-Jan-2018 A Approved Closed

70cm CMU Morter & Masonry Inspection Under Exterior Reinforced Cluster 49
3429 KHEP-CI-3429
Grade Beam Cluster 49 BC6 BC6
NA Division 3 23-Jan-2018 24-Jan-2018 10:00 AM 24-Jan-2018 A Approved Closed

Installation of Reinforceing Steel Bar Embedded Item & Closure Cluster 55


3430 KHEP-CI-3430
Inspection for RC Column ground floor Cluster 55 BC4 BC4
NA Division 3 23-Jan-2018 24-Jan-2018 2:00 PM 27-Jan-2018 A Approved Closed

Installation of Reinforceing Steel Bar internal shutter for storm


Zone Approved w/
3431 KHEP-CI-3431 manholes precast yard Zone 3B,4B,5C Line 26,27,33 MH-124-L33 Line 26,27,33
3B,4B,5C
Division 33 23-Jan-2018 24-Jan-2018 2:00 PM 24-Jan-2018 B comments
Closed
MH-105-L27 MH-101-L27 MH-110A-L27 MH-127-L26

Second coat dam proofing installation inspection for storm manholes


precast yard Zone 1B, 4B Line 1,4,5,9,3 MH-I8-L01 MH-I7-L03 MH-
3432 KHEP-CI-3432
I11-L05 MH-I10-L04 MH-I12-L04 MH-I13-L04 MH-I22-L09 MH-I23-
Line 1,4,5,9,3 Zone 1B, 4B Division 33 23-Jan-2018 24-Jan-2018 10:30 AM 24-Jan-2018 A Approved Closed
L09 MH-I24-L09 MH-I25-L09
Compaction test around footing general fill 2nd layer Zone 2B Cluster Cluster 31
3433 KHEP-CI-3433
31 BC2 BC2
Zone 2B Division 31 23-Jan-2018 24-Jan-2018 10:00 AM 24-Jan-2018 A Approved Closed

Compaction test of sand filling up to the pipe 1st layer around


3434 KHEP-CI-3434 manhole sewer main line Zone 1B Line 3,4 MH-3-L03 MH-2-L03 MH- Line 3,4 Zone 1B Division 31 23-Jan-2018 24-Jan-2018 11:00 AM 25-Jan-2018 A Approved Closed
1-L03 MH-1-L04 MH-2-L04
Compaction test of sand filling up to the pipe 1st layer around
3435 KHEP-CI-3435
manhole sewer main line Zone 1B Line 11 MH-I34-L11
Line 11 Zone 1B Division 31 23-Jan-2018 24-Jan-2018 11:00 AM 25-Jan-2018 A Approved Closed

Cast in place concrete form work inspection for RC column first floor Cluster 21
3436 KHEP-CI-3436
Cluster 21 BC4 BC4
NA Division 3 23-Jan-2018 24-Jan-2018 2:00 PM 24-Jan-2018 A Approved Closed

Installation of Sewer GRP Manholes Sewer mani line Zone 1B, Line 1
3437 KHEP-CI-3437
MH-10-L01 Mh-11-L01 MH-12-L01
Line 1 Zone 1B Division 31 23-Jan-2018 24-Jan-2018 10:30 AM 25-Jan-2018 A Approved Closed

Inspection of soncrete pouring for sewer GRP manholes precast yard


Line
Zone 3B,4B Line 2,25,26,1,17,23 MH-23-L02 MH-24-L02 MH-4-L26
3438 KHEP-CI-3438
MH-23-A-L02 MH-1-L25 MH-28-L01 MH-27-L01 MH-2-L17 MH-2-A-
2,25,26,1,17, Zone 3B,4B Division 33 23-Jan-2018 24-Jan-2018 11:00 AM 24-Jan-2018 A Approved Closed
23
L17 MH-2-L23

Inspection of concrete pouring for sewer GRP manholes precast yard


Line
Zone 3B,4B Line 19,20,21,22,16,37,35,17 MH-2-L19 MH-3-L19 MH-
3439 KHEP-CI-3439
1-L20 MH-1-A-L20 MH-1-L21 MH-1-L22 MH-1-A-L22 MH-2-L22 MH-4-
19,20,21,22,1 Zone 3B,4B Division 33 23-Jan-2018 24-Jan-2018 11:00 AM 24-Jan-2018 A Approved Closed
6,37,35,17
L16 MH-1-L37 MH-1-L17 MH-1-L35

Cast in place concrete form work inspection for RC column first floor
3440 KHEP-CI-3440
Cluster 30 B2
Cluster 30 B2 NA Division 3 23-Jan-2018 24-Jan-2018 10:00 AM 24-Jan-2018 A Approved Closed

70cm CMU Morter & Masonry Inspection Under Exterior Reinforced Cluster 28
3441 KHEP-CI-3441
Grade Beam Cluster 28 BC4 BC4
NA Division 4 24-Jan-2018 25-Jan-2018 2:00 PM 25-Jan-2018 A Approved Closed

Cast in place concrete form work inspection for RC column first floor
3442 KHEP-CI-3442
Cluster 34 B2
Cluster 34 B2 NA Division 3 24-Jan-2018 25-Jan-2018 10:00 AM 29-Jan-2018 A Approved Closed

Concrete sampling testing & placement inspection for RC column Cluster 24


3443 KHEP-CI-3443
ground floor Cluster 24 BC4 BC4
NA Division 3 24-Jan-2018 25-Jan-2018 9:00 AM 25-Jan-2018 A Approved Closed

Second coat dam proofing installation inspection for grade beam Cluster 16
3444 KHEP-CI-3444
inside Cluster 16 BC4 BC4
NA Division 7 24-Jan-2018 25-Jan-2018 10:00 AM 27-Jan-2018 A Approved Closed

Concrete sampling testing & placement inspection for RC slab firt


3445 KHEP-CI-3445
floor Cluster 54 B2
Cluster 54 B2 NA Division 3 24-Jan-2018 25-Jan-2018 9:30 AM 25-Jan-2018 A Approved Closed

First coat Dam proofing installation insoection for RC footing & Cluster 62
3446 KHEP-CI-3446
column neck Cluster 62 BC6 BC6
NA Division 3 24-Jan-2018 25-Jan-2018 10:30 AM 27-Jan-2018 A Approved Closed

Dam Proofing surface preparation for RC grade beam internal face


3447 KHEP-CI-3447
only inside the building Cluster 73 B2
Cluster 73 B2 NA Division 7 24-Jan-2018 25-Jan-2018 10:00 AM 27-Jan-2018 A Approved Closed

Concrete sampling testing & placement inspection for RC column Cluster 53


3448 KHEP-CI-3448
neck Cluster 53 BC6 BC6
NA Division 3 24-Jan-2018 25-Jan-2018 9:30 AM 25-Jan-2018 A Approved Closed

First coat Dam proofing installation insoection for RC grade beam


3449 KHEP-CI-3449
internal face only inside the building Cluster 61 B2
Cluster 61 B2 NA Division 7 24-Jan-2018 25-Jan-2018 9:45 AM 27-Jan-2018 A Approved Closed

Concrete sampling testing & placement inspection for RC column first


3450 KHEP-CI-3450
floor coverage inside the grid line H-N / 1-6 Cluster 81 A6
Cluster 81 A6 NA Division 3 24-Jan-2018 25-Jan-2018 9:30 AM 27-Jan-2018 E Rejected Closed

Concrete sampling testing & placement inspection for RC column first


3450.1 KHEP-CI-3450-01
floor coverage inside the grid line H-N / 1-6 Cluster 81 A6
Cluster 81 A6 NA Division 3 1-Feb-2018 3-Feb-2018 9:30 AM 4-Feb-2018 E Rejected Closed

Compaction test general fill main line 6th layer sewer main line Zone
3451 KHEP-CI-3451
1B Line 1 MH-8-L01 MH-7-L01 MH-7-L01 MH-6-L01
Line 1 Zone 1B Division 31 24-Jan-2018 25-Jan-2018 11:00 AM 27-Jan-2018 A Approved Closed

Compaction test around footing general 1st layer Zone 1B Cluster 38 Cluster 38
3452 KHEP-CI-3452
BC6 BC6
Zone 1B Division 31 24-Jan-2018 25-Jan-2018 2:30 PM 27-Jan-2018 A Approved Closed

Installation inspection of Precast Storm Drainage Manholes Zone 1B


3453 KHEP-CI-3453
Line 15 MH-54-L15 MH-46-L15
Line 15 Zone 1B Division 33 24-Jan-2018 25-Jan-2018 11:00 AM 27-Jan-2018 A Approved Closed

Inspection form work for base & wall for storm catch basin pre cast
yard Zone 3B Line 18,20,27,39 CB-147 MH-61-L18 CB-148,149 MH-
62-L18 CB-150 CB-151 MH-63-L18 CB-152 CB153 MH-64-L18 CB154 Line
3454 KHEP-CI-3454
CB-155 MH-136-L39 CB-156 CB-156 CB-158 MH-100-L27 CB-159 CB- 18,20,27,39
Zone 3B Division 33 24-Jan-2018 25-Jan-2018 1:30 PM 27-Jan-2018 A Approved Closed
160 MH-71-L20 CB-161 CB-162 MH-70-L20 CB-163 CB-164 CB-165
MH-68-L20 CB-166 MH-67-L20 Alongg RD 1 & 3

Blinding concrete sampling testing & placement inspection for


3455 KHEP-CI-3455 manhole sewer main line Zone 2B & 3B Line 1 MH-9-L01 MH-13-L01 Line 1 Zone 2B & 3B Division 31 24-Jan-2018 25-Jan-2018 10:30 AM 27-Jan-2018 A Approved Closed
MH-14-L01 MH-15-L01

Inspection of concrete pouring for Sewer GRP Manholes. (Precast


Line
yard ) Zone 3B & 4B Line 26,13,23,18,16,14,15,24,25,19 MH-1-A-
26,13,23,18,1
3456 KHEP-CI-3456 L23 MH-1-A-L26 MH-1-L16 MH-1-L19 MH-1-A-L25 MH-1-A-L24 MH-
6,14,15,24,25
Zone 3B & 4B Division 33 25-Jan-2018 27-Jan-2018 1:30 PM 29-Jan-2018 A Approved Closed
1-A-L18 MH-1-L24 MH-1-A-L13 MH-1-L13 MH-1-L18 MH-1-L15 MH-1-
,19
A-L14 MH-1-L14 MH-1-L26

Inspection for sewer GRP manholes sewer main line MH-13-L01 MH-
3457 KHEP-CI-3457
14-L01 MH-15-L01 MH-9-L01 Zone 1B Line 1
Line 1 Zone 1B Division 31 25-Jan-2018 27-Jan-2018 10:30 AM 29-Jan-2018 A Approved Closed
Inspection of pre back filling for around manhole sewer main line
3458 KHEP-CI-3458 MH-5-A-L02 MH-4-L02 MH-3-L02 MH-1-L05 MH-2-L05 Zone 1B Line Line 2,5 Zone 1B Division 31 25-Jan-2018 27-Jan-2018 11:00 AM 29-Jan-2018 A Approved Closed
2,5
Concrete sampling testing & placement inspection for RC slab roof
3459 KHEP-CI-3459
floor Cluster 71 B2
Cluster 71 B2 NA Division 3 25-Jan-2018 27-Jan-2018 9:30 AM 29-Jan-2018 A Approved Closed

70cm CMU morter & masonry inspection under exterior reinforced Cluster 47
3460 KHEP-CI-3460
grade beam Cluster 47 BC6 BC6
NA Division 1 25-Jan-2018 27-Jan-2018 2:00 PM 28-Jan-2018 A Approved Closed

Check the survey work elevation & coodinate for building under Cluster 70
3461 KHEP-CI-3461
grade beam Cluster 70 BC4 BC4
NA Division 1 25-Jan-2018 27-Jan-2018 10:00 AM 28-Jan-2018 A Approved Closed

Concrete sampling testing & placement inspection for RC Column


3462 KHEP-CI-3462
First floor Cluster 30 B2
Cluster 30 B2 NA Division 3 27-Jan-2018 28-Jan-2018 9:00 AM 29-Jan-2018 E Rejected Closed

Concrete sampling testing & placement inspection for RC Column Approved w/


3462.1 KHEP-CI-3462-01
First floor Cluster 30 B2
Cluster 30 B2 NA Division 3 31-Jan-2018 1-Jan-2018 9:00 AM 1-Feb-2018 B comments
Closed

Cast in place concrete form work inspection for RC grade beam Cluster 42
3463 KHEP-CI-3463
Cluster 42 BC4 BC4
NA Division 3 27-Jan-2018 28-Jan-2018 10:00 AM 29-Jan-2018 A Approved Closed

Installation of Reinforcing steel bar Embedded item & Closure Cluster 42


3464 KHEP-CI-3464
Inspection for RC grade beam Cluster 42 BC4 BC4
NA Division 3 27-Jan-2018 28-Jan-2018 10:00 AM 29-Jan-2018 A Approved Closed

Second coat dam proofing installation for grade beam internal face
3465 KHEP-CI-3465
only inside the building Cluster 61 B2
Cluster 61 B2 NA Division 7 27-Jan-2018 28-Jan-2018 1:30 PM 29-Jan-2018 A Approved Closed

Second coat dam proofing installation for RC footing & column neck Cluster 62
3466 KHEP-CI-3466
Cluster 62 BC6 BC6
NA Division 7 27-Jan-2018 28-Jan-2018 2:00 PM 29-Jan-2018 A Approved Closed

Cast in place concrete form work inspection for RC grade beam


3467 KHEP-CI-3467
Cluster 46 A6
Cluster 46 A6 NA Division 3 27-Jan-2018 28-Jan-2018 10:00 AM 29-Jan-2018 A Approved Closed

Installation of Reinforcing steel bar Embedded item & Closure


3468 KHEP-CI-3468
Inspection for RC grade beam Cluster 46 A6
Cluster 46 A6 NA Division 3 27-Jan-2018 28-Jan-2018 10:30 AM 29-Jan-2018 A Approved Closed

Compaction testaround footing general fill 2nd layer Zone 2B Cluster Cluster 38
3469 KHEP-CI-3469
38 BC6 BC6
Zone 2B Division 31 27-Jan-2018 28-Jan-2018 2:30 PM 29-Jan-2018 A Approved Closed

Box Closing & Grounding for storm embedded pice at manhole Zone
3470 KHEP-CI-3470
1B Line 15 MH-54-L15 MH-46-L15
Line 15 Zone 1B Division 33 27-Jan-2018 28-Jan-2018 11:00 AM 30-Jan-2018 A Approved Closed

Inspection Formwork for storm embedded pice at Manhole Zone 3B


3471 KHEP-CI-3471
Line 20 MH-70-L20 one side MH-69-L20 & MH-68-L20 two side
Line 20 Zone 3B Division 33 27-Jan-2018 28-Jan-2018 1:30 PM 29-Jan-2018 A Approved Closed

Inspection concrete pouring storm catch basin pre cast yard Zone
3B Line 18,20,27,39 CB-147 MH-61-L18 CB-148,149 MH-62-L18 CB-
150 CB-151 MH-63-L18 CB-152 CB153 MH-64-L18 CB154 CB-155 Line Approved w/
3472 KHEP-CI-3472
MH-136-L39 CB-156 CB-156 CB-158 MH-100-L27 CB-159 CB-160 18,20,27,39
Zone 3B Division 33 27-Jan-2018 28-Jan-2018 11:00 AM 29-Jan-2018 B comments
Closed
MH-71-L20 CB-161 CB-162 MH-70-L20 CB-163 CB-164 CB-165 MH-
68-L20 CB-166 MH-67-L20 Alongg RD 1 & 3

Compaction test general fill main line 7th layer sewer main line Zone
3473 KHEP-CI-3473
1B Line 1 MH-8-L01 MH-7-L01 MH-7-L01 MH-6-L01
Line 1 Zone 1B Division 31 27-Jan-2018 28-Jan-2018 11:00 AM 29-Jan-2018 A Approved Closed

Termite control surface preparation installation & final instection for


3474 KHEP-CI-3474
slab on grade Cluster 13 B2
Cluster 13 B2 NA Division 3 27-Jan-2018 28-Jan-2018 9:00 AM 29-Jan-2018 A Approved Closed

Inspection of gravel filling around pipe trench & around manhole


with geotextile protection sheet Sewer main line 200mm Zone 1B
3475 KHEP-CI-3475
Line 2 MH-5-L02 to MH-5-A-L02 MH-5-A-L02 to MH-4-L02 MH-4-L02
Line 2 Zone 1B Division 31 27-Jan-2018 28-Jan-2018 11:00 AM 29-Jan-2018 A Approved Closed
to MH-3-L02
Compaction test of sand bedding under pipe trench portable & fire
P Sta 0+012
3476 KHEP-CI-3476 fighting Dia 160mm Zone 1B P Sta 0+012 to Sta 0+100 along rd 5
to Sta 0+100
Zone 1B Division 31 27-Jan-2018 28-Jan-2018 11:00 AM 29-Jan-2018 A Approved Closed
ISO-61 to ISO-62
Inspection of excavated & compaction formation for storm manholes
3477 KHEP-CI-3477
storm main liine MH-I5-L02 Zone 1B Line 2
Line 2 Zone 1B Division 31 27-Jan-2018 28-Jan-2018 11:00 AM 29-Jan-2018 A Approved Closed

Inspection og excavated & compaction formation for storm manholes Approved w/


3478 KHEP-CI-3478
storm main liine MH-5-L27 MH-4-L27 Zone 2B Line 27
Line 27 Zone 2B Division 31 27-Jan-2018 28-Jan-2018 11:30 AM 29-Jan-2018 B comments
Closed

3479 KHEP-CI-3479 Compaction test final layer under slab on grade Cluster 5 B2 Cluster 5 B2 NA Division 3 27-Jan-2018 28-Jan-2018 10:00 AM 30-Jan-2018 A Approved Closed
Compaction test first layer pre final layer for backfilling under slab on
3480 KHEP-CI-3480
grade Cluster 10 B2
Cluster 10 B2 NA Division 3 27-Jan-2018 28-Jan-2018 10:00 AM 30-Jan-2018 A Approved Closed

Concrete sampling testing & placement inspection for RC column first Cluster 21
3481 KHEP-CI-3481
floor Cluster 21 BC4 BC4
NA Division 3 27-Jan-2018 28-Jan-2018 9:00 AM 29-Jan-2018 A Approved Closed

Cast in place concrete form work inspection for RC first floor slab &
3482 KHEP-CI-3482
stair Cluster 44 A6
Cluster 44 A6 NA Division 3 28-Jan-2018 29-Jan-2018 10:00 AM 30-Jan-2018 A Approved Closed

Installation of Reinforcing steel bar Embedded item & Closure


3483 KHEP-CI-3483
Inspection for RC first floor slab & stair Cluster 44 A6
Cluster 44 A6 NA Division 3 28-Jan-2018 29-Jan-2018 10:00 AM 30-Jan-2018 A Approved Closed

Concrete sampling testing & placement inspection for RC column first Approved w/
3484 KHEP-CI-3484
floor Cluster 34 B2
Cluster 34 B2 NA Division 3 28-Jan-2018 29-Jan-2018 9:00 AM 29-Jan-2018 B comments
Closed
70cm CMU morter & masonry inspection under exterior reinforced Cluster 39
3485 KHEP-CI-3485
grade beam Cluster 39 BC6 BC6
NA Division 4 28-Jan-2018 29-Jan-2018 2:00 PM 30-Jan-2018 A Approved Closed

Cast in place concrete form work inspection for RC slab on grade Approved w/
3486 KHEP-CI-3486
Cluster 14 B2
Cluster 14 B2 NA Division 3 28-Jan-2018 29-Jan-2018 10:00 AM 30-Jan-2018 B comments
Closed

Installation of Reinforcing steel bar Embedded item & Closure


3487 KHEP-CI-3487
Inspection for RC slab on grade Cluster 14 B2
Cluster 14 B2 NA Division 3 28-Jan-2018 29-Jan-2018 10:00 AM 30-Jan-2018 A Approved Closed

70cm CMU morter & masonry inspection under exterior reinforced Cluster 29
3488 KHEP-CI-3488
grade beam Cluster 29 BC4 BC4
NA Division 3 28-Jan-2018 29-Jan-2018 2:00 PM 30-Jan-2018 A Approved Closed

Cast in place concrete form work inspection for RC grade beam Cluster 26
3489 KHEP-CI-3489
Cluster 26 BC4 BC4
NA Division 3 28-Jan-2018 29-Jan-2018 2:00 PM 31-Jan-2018 E Rejected Closed

Cast in place concrete form work inspection for RC grade beam Cluster 26
3489.1 KHEP-CI-3489-01
Cluster 26 BC4 BC4
NA Division 3 15-Feb-2018 17-Feb-2018 10:00 AM 19-Feb-2018 A Approved Closed

Installation of reinforcing steel bar embedded item & form closure Cluster 26
3490 KHEP-CI-3490
inspection for RC grade beam Cluster 26 BC4 BC4
NA Division 3 28-Jan-2018 29-Jan-2018 2:00 PM 31-Jan-2018 A Approved Closed

Inspection form work for base & wall & concrete Pouring for Storm
Line Zone
3491 KHEP-CI-3491 manholes Precast yard Zone 3B,4B,5C Line 26,27,33 MH-124-L33
26,27,33 3B,4B,5C
Division 33 28-Jan-2018 29-Jan-2018 2:00 PM 29-Jan-2018 E Rejected Closed
MH-105-L27 MH-101-L27 MH-110A-L27 MH-127-L26

Inspection form work for base & wall & concrete Pouring for Storm
Line Zone
3491.1 KHEP-CI-3491-01 manholes Precast yard Zone 3B,4B,5C Line 26,27,33 MH-124-L33
26,27,33 3B,4B,5C
Division 33 30-Jan-2018 31-Jan-2018 2:00 PM 1-Feb-2018 E Rejected Closed
MH-105-L27 MH-101-L27 MH-110A-L27 MH-127-L26

Inspection form work for base & wall & concrete Pouring for Storm
Line Zone
3491.2 KHEP-CI-3491-02 manholes Precast yard Zone 3B,4B,5C Line 26,27,33 MH-124-L33
26,27,33 3B,4B,5C
Division 33 3-Feb-2018 4-Feb-2018 2:00 PM 6-Feb-2018 E Rejected Closed
MH-105-L27 MH-101-L27 MH-110A-L27 MH-127-L26

Inspection form work for base & wall & concrete Pouring for Storm
Line Zone
3491.3 KHEP-CI-3491-03 manholes Precast yard Zone 3B,4B,5C Line 26,27,33 MH-124-L33
26,27,33 3B,4B,5C
Division 33 7-Feb-2018 8-Feb-2018 2:00 PM 10-Feb-2018 A Approved Closed
MH-105-L27 MH-101-L27 MH-110A-L27 MH-127-L26

Compaction test of sanding Bedding under Pipe 1st layer around


3492 KHEP-CI-3492
manhole sewer main line Zone 1B Line 5 MH-2-L05 MH-1-L05
Line 5 Zone 1B Division 33 28-Jan-2018 29-Jan-2018 11:00 AM 29-Jan-2018 A Approved Closed

Compaction test of sanding Bedding under Pipe 2nd layer & laying
3493 KHEP-CI-3493 warning tape around manhole storm main line Zone 1B Line 11,13 Line 11,13 Zone 1B Division 31 28-Jan-2018 29-Jan-2018 11:00 AM 29-Jan-2018 A Approved Closed
MH-I34-L11 MH-I42-L13 MH-I40-L13 MH-I39-L13
Termite control surface preparation installation & final inspection fo
3494 KHEP-CI-3494
grade beam Cluster 67 A4
Cluster 67 A4 NA Division 3 28-Jan-2018 29-Jan-2018 9:30 AM 30-Jan-2018 A Approved Closed

Termite control surface preparation installation & final inspection fo Cluster 74


3495 KHEP-CI-3495
grade beam Cluster 74 BC4 BC4
NA Division 3 28-Jan-2018 29-Jan-2018 9:30 AM 30-Jan-2018 A Approved Closed

Termite control surface preparation installation & final inspection fo Cluster 70


3496 KHEP-CI-3496
grade beam Cluster 70 BC4 BC4
NA Division 3 28-Jan-2018 29-Jan-2018 9:30 AM 30-Jan-2018 A Approved Closed

Termite control surface preparation installation & final inspection fo Cluster 77


3497 KHEP-CI-3497
grade beam Cluster 77 BC4 BC4
NA Division 3 28-Jan-2018 29-Jan-2018 9:30 AM 30-Jan-2018 A Approved Closed

Termite control surface preparation installation & final inspection fo Cluster 78


3498 KHEP-CI-3498
grade beam Cluster 78 BC4 BC4
NA Division 3 28-Jan-2018 29-Jan-2018 9:30 AM 30-Jan-2018 A Approved Closed

Blinding concrete sampling testing & placement inspection for grade


3499 KHEP-CI-3499
beam Cluster 67 A4
Cluster 67 A4 NA Division 3 28-Jan-2018 29-Jan-2018 9:30 AM 30-Jan-2018 A Approved Closed

Cast in place concrete form work inspection for RC footing Cluster 59


3500 KHEP-CI-3500
foundation Cluster 59 BC6 BC6
NA Division 3 28-Jan-2018 29-Jan-2018 2:00 PM 30-Jan-2018 A Approved Closed

Installation of Reinforcing steel bar Embedded item & Closure Cluster 59


3501 KHEP-CI-3501
Inspection for RC footing foundation Cluster 59 BC6 BC6
NA Division 3 28-Jan-2018 29-Jan-2018 2:30 PM 30-Jan-2018 A Approved Closed

Blinding concrete sampling testing & placement inspection for grade Cluster 74
3502 KHEP-CI-3502
beams Cluster 74 BC4 BC4
NA Division 3 28-Jan-2018 29-Jan-2018 9:30 AM 30-Jan-2018 A Approved Closed

Cast in place concrete form work inspection for RC slab first floor &
3503 KHEP-CI-3503
stairs ground floor Cluster 66 A4
Cluster 66 A4 NA Division 3 28-Jan-2018 29-Jan-2018 2:30 PM 30-Jan-2018 A Approved Closed

Installation of Reinforcing steel bar Embedded item & Closure


3504 KHEP-CI-3504
Inspection for Rcslab first floor & stairs Cluster 66 A4
Cluster 66 A4 NA Division 3 28-Jan-2018 29-Jan-2018 3:00 PM 30-Jan-2018 A Approved Closed

Cast in place concrete form work inspection for Rc column first floor
3505 KHEP-CI-3505
Cluster 54 B2
Cluster 54 B2 NA Division 3 29-Jan-2018 30-Jan-2018 10:30 AM 31-Jan-2018 A Approved Closed

Blinding concrete sampling testing & placement inspection for grade Cluster 77
3506 KHEP-CI-3506
beam Cluster 77 BC4 BC4
NA Division 3 29-Jan-2018 30-Jan-2018 9:30 AM 31-Jan-2018 A Approved Closed

Blinding concrete sampling testing & placement inspection for grade Cluster 78
3507 KHEP-CI-3507
beam Cluster 78 BC4 BC4
NA Division 3 29-Jan-2018 30-Jan-2018 9:30 AM 31-Jan-2018 A Approved Closed

Blinding concrete sampling testing & placement inspection for grade Cluster 70
3508 KHEP-CI-3508
beam Cluster 70 BC4 BC4
NA Division 3 29-Jan-2018 30-Jan-2018 9:30 AM 31-Jan-2018 A Approved Closed
Dam proofing Surface Preparation for RC Footing & Column Neck Cluster 80
3509 KHEP-CI-3509
Cluster 80 BC6 BC6
NA Division 3 29-Jan-2018 30-Jan-2018 10:00 AM 31-Jan-2018 A Approved Closed

3510 KHEP-CI-3510 Compaction test final layer under slab on grade Cluster 10 B2 Cluster 10 B2 NA Division 3 29-Jan-2018 30-Jan-2018 10:00 AM 31-Jan-2018 A Approved Closed

Termite control surface preparation installation & final inspection fo


3511 KHEP-CI-3511
grade beam Cluster 5 B2
Cluster 5 B2 NA Division 3 29-Jan-2018 30-Jan-2018 9:00 AM 31-Jan-2018 A Approved Closed

Commpaction test general fill around manhole 1st layer sewer main
Line
3512 KHEP-CI-3512 line MH-1-L04 MH-2-L04 MH-1-A-L34 MH-2-L04 MH-1-A-L33 MH-1-
4,31,33,34
Zone 1B Division 31 29-Jan-2018 30-Jan-2018 11:00 AM 31-Jan-2018 E Rejected Closed
L33 MH-2-L31 MH-3-L31 Zone 1B Line 4,31,33,34

Commpaction test general fill around manhole 1st layer sewer main
Line
3512.1 KHEP-CI-3512-01 line MH-1-L04 MH-2-L04 MH-1-A-L34 MH-2-L04 MH-1-A-L33 MH-1-
4,31,33,34
Zone 1B Division 31 3-Feb-2018 4-Feb-2018 11:00 AM 5-Feb-2018 A Approved Closed
L33 MH-2-L31 MH-3-L31 Zone 1B Line 4,31,33,34

Commpaction test general fill around manhole 1st layer sewer main
3513 KHEP-CI-3513
line MH-I41-L13 Zone 1B Line 13
Line 13 Zone 1B Division 31 29-Jan-2018 30-Jan-2018 11:00 AM 31-Jan-2018 A Approved Closed

Inspection of laying warning tape installation sewer main line Dia Ø


3514 KHEP-CI-3514 200mm Zone 1B Line 2 MH-5-L02 to MH-5-A-L02 - MH-5-A-L02 to Line 2 Zone 1B Division 31 29-Jan-2018 30-Jan-2018 10:30 AM 31-Jan-2018 A Approved Closed
MH-3-L02
Compaction test of sand filling up to the pipe 22d layer & laying
3515 KHEP-CI-3515 warning tape around manhole sewer mine line MH-1-L05 MH-2-L05 Line 5 Zone 1B Division 31 29-Jan-2018 30-Jan-2018 11:00 AM 31-Jan-2018 A Approved Closed
Zone 1B Line 5
Inspection form work & concrete pouring for sewer main line
3516 KHEP-CI-3516 embedded pice at manhole MH-6-L01 MH-5-L01 One side Zone 1B Line 1 Zone 1B Division 31 29-Jan-2018 30-Jan-2018 2:30 PM 31-Jan-2018 E Rejected Closed
Line 1
Inspection form work & concrete pouring for sewer main line
Approved w/
3516.1 KHEP-CI-3516-01 embedded pice at manhole MH-6-L01 MH-5-L01 One side Zone 1B Line 1 Zone 1B Division 31 4-Feb-2018 5-Feb-2018 2:30 PM 6-Feb-2018 B comments
Closed
Line 1
Installation of Reinforcing steel bar Embedded item & Closure Cluster 25
3517 KHEP-CI-3517
Inspection for RC column ground floor Cluster 25 BC4 BC4
NA Division 3 30-Jan-2018 31-Jan-2018 10:00 AM 31-Jan-2018 A Approved Closed

Cast in place concrete form work inspection for RC slab on grade


3518 KHEP-CI-3518
Cluster 13 B2
Cluster 13 B2 NA Division 3 30-Jan-2018 31-Jan-2018 10:00 AM 4-Feb-2018 E Rejected Closed

Cast in place concrete form work inspection for RC slab on grade Approved w/
3518.1 KHEP-CI-3518-01
Cluster 13 B2
Cluster 13 B2 NA Division 3 4-Feb-2018 5-Feb-2018 10:00 AM 6-Feb-2018 B comments
Closed

Installation of Reinforcing steel bar Embedded item & Closure


3519 KHEP-CI-3519
Inspection for RC slab on grade Cluster 13 B2
Cluster 13 B2 NA Division 3 30-Jan-2018 31-Jan-2018 10:00 AM 1-Feb-2018 A Approved Closed

Concrete sampling testing & placement inspection for RC slab on Approved w/


3520 KHEP-CI-3520
grade Cluster 14 B2
Cluster 14 B2 NA Division 3 30-Jan-2018 31-Jan-2018 9:00 AM 31-Jan-2018 B comments
Closed

Cast in place concrete form work inspection for RC parapet Cluster


3521 KHEP-CI-3521
15 B2
Cluster 15 B2 NA Division 3 30-Jan-2018 31-Jan-2018 10:00 AM 4-Feb-2018 E Rejected Closed

Cast in place concrete form work inspection for RC parapet Cluster


3521.1 KHEP-CI-3521-01
15 B2
Cluster 15 B2 NA Division 3 10-Feb-2018 11-Feb-2018 10:00 AM 12-Feb-2018 E Rejected Closed

Cast in place concrete form work inspection for concrete coping at


3521.2 KHEP-CI-3521-02 Cluster 15 B2 NA Division 3 28-Feb-2018 1-Mar-2018 10:00 AM Open
roof slab in Cluster 15 B2
Installation of Reinforcing steel bar Embedded item & Closure
3522 KHEP-CI-3522
Inspection for RC parapet Cluster 15 B2
Cluster 15 B2 NA Division 3 30-Jan-2018 31-Jan-2018 10:00 AM 4-Feb-2018 E Rejected Closed

Installation of Reinforcing steel bar Embedded item & Closure


3522.1 KHEP-CI-3522-01
Inspection for RC parapet Cluster 15 B2
Cluster 15 B2 NA Division 3 10-Feb-2018 11-Feb-2018 10:00 AM 12-Feb-2018 E Rejected Closed

Installation of Reinforcing steel bar Embedded item & Closure


3522.2 KHEP-CI-3522-02 Cluster 15 B2 NA Division 3 28-Feb-2018 1-Mar-2018 10:00 AM Open
Inspection for concrete coping at roof slab Cluster 15 B2
Compaction test around footing general fill 3rd layer Zone 2B Cluster Cluster 38
3523 KHEP-CI-3523
38 BC6 BC6
Zone 2B Division 31 30-Jan-2018 31-Jan-2018 2:30 PM 1-Feb-2018 A Approved Closed

Inspection of gravel bedding installation under pipe trench with


3524 KHEP-CI-3524 Geotextile Protection Sheet sewer Main Line Dia 200mm Zone 1B Line 2 Zone 1B Division 31 30-Jan-2018 31-Jan-2018 11:00 AM 31-Jan-2018 A Approved Closed
Line 02 MH-3-L02 to MH-2-L02
Inspection of excavated formation for pipe trench sewer main line
3525 KHEP-CI-3525
Dia 200mm Zone 1B Line 2 MH-2-L02 MH-2-L02
Line 2 Zone 1B Division 31 30-Jan-2018 31-Jan-2018 9:30 AM 31-Jan-2018 A Approved Closed

Inspection of concrete popuring for storm embedded pice at manhole


3526 KHEP-CI-3526 Zone 3B Line 20 MH-70-L20 one side MH-69-L20 & MH-68-L20 two Line 20 Zone 3B Division 31 30-Jan-2018 31-Jan-2018 11:30 AM 31-Jan-2018 A Approved Closed
side
Concrete sampling testing & placement Inspection for grade beam
3527 KHEP-CI-3527
Cluster 46 A6
Cluster 46 A6 NA Division 3 30-Jan-2018 31-Jan-2018 9:30 AM 31-Jan-2018 A Approved Closed

3528 KHEP-CI-3528 Compaction test final layer under slab on grade Cluster 7 B2 Cluster 7 B2 NA Division 3 30-Jan-2018 31-Jan-2018 10:00 AM 31-Jan-2018 A Approved Closed
Cast in place concrete form work inspection for RC first floor slab & Cluster 23
3529 KHEP-CI-3529
stair Cluster 23 BC4 BC4
NA Division 3 31-Jan-2018 1-Feb-2018 10:00 AM 4-Feb-2018 A Approved Closed
Installation of Rein forcement steel bar Embedded item & Closure Cluster 23
3530 KHEP-CI-3530
Inspection for RC first floor slab & stair Cluster 23 BC4 BC4
NA Division 3 31-Jan-2018 1-Feb-2018 10:00 AM 1-Feb-2018 A Approved Closed

Concrete sampling testing & placement Inspection for RC first floor Approved w/
3531 KHEP-CI-3531
slab & stair Cluster 44 A6
Cluster 44 A6 NA Division 3 31-Jan-2018 1-Feb-2018 9:00 AM 1-Feb-2018 B comments
Closed

Installation of Rein forcement steel bar Embedded item & Closure


3532 KHEP-CI-3532
Inspection for RC column first floor axis H-N Cluster 44 A6
Cluster 44 A6 NA Division 3 31-Jan-2018 1-Feb-2018 2:00 PM 1-Feb-2018 A Approved Closed

Concrete sampling testing & placement Inspection for RC slab first


3533 KHEP-CI-3533
floor & RC stair ground floor Cluster 66 A6
Cluster 66 A6 NA Division 3 31-Jan-2018 1-Feb-2018 9:30 AM 5-Feb-2018 E Rejected Closed

Cast in place concrete form work inspection for RC column ground Cluster 37
3534 KHEP-CI-3534
floor Cluster 37 BC4 BC4
NA Division 3 31-Jan-2018 1-Feb-2018 10:00 AM 1-Feb-2018 A Approved Closed

Inspection form work for storm embedded pice at manhole Zone 1B


3535 KHEP-CI-3535
Line 15 MH-46-L15 one side MH-54-L15 three side
Line 15 Zone 1B Division 33 31-Jan-2018 1-Feb-2018 10:00 AM 3-Feb-2018 A Approved Closed

Inspection form work for storm embedded pice at manhole Zone 1B


3536 KHEP-CI-3536
Line 15 MH-46-L15 one side MH-54-L15 three side
Line 15 Zone 1B Division 33 31-Jan-2018 1-Feb-2018 1:30 PM 3-Feb-2018 A Approved Closed

Inspection Reinforcement steel bar ,Formwork for cover slab and


concrete pouring for Storm Manholes Precast yard Zone 1B, 2B Line
3537 KHEP-CI-3537
7,15 MH-27-L07 MH-51-L15 MH-52-L15 MH-28-L07 MH-46-L15 MH-
Line 7,15 Zone 1B, 2B Division 33 31-Jan-2018 1-Feb-2018 2:00 PM 1-Feb-2018 A Approved Closed
47-L15 MH-48-L15 MH-49-L15 MH-50-L15
Inspection Reinforcement steel bar ,Formwork for cover slab and
concrete pouring for Storm Manholes Precast yard MH-I31-L10 MH- Line Approved w/
3538 KHEP-CI-3538
I53-L16 MH-I33-L11 MH-I34-L11 MH-I39-L13 MH-I40-L13 MH-I41- 10,11,13,16
Zone 1B Division 33 31-Jan-2018 1-Feb-2018 2:00 PM 6-Feb-2018 B comments
Closed
L13 MH-I42-L13 Line 10,11,13,16 Zone 1B

Inspection of Reinforcement steel bar and internal shutter for Storm


Catch Basin Zone 2B Line 7,18,01,35 11Pic CB-178 At MH-79-L21 / Line
Approved w/
3539 KHEP-CI-3539 CB-177 &CB-176 at MH-105-L27 CB-170 & CB-171 / MH-101-L27 / 7,18,01,35 Zone 2B Division 33 31-Jan-2018 1-Feb-2018 11:30 AM 1-Feb-2018 B comments
Closed
CB-169 & CB-168 At MH-77-L21 CB-172 & CB-173 & CB-174 At MH- 11Pic
78-L21 / CB-167 At MH-67-L20

Inspection of Reinforcement steel bar Formwork and concrete


pouring for Protection slab 42 Pic Storm Main line Precast yard MH- Approved w/
3540 KHEP-CI-3540
136-L39 to MH-71-L20 MH-I85-L23 to MH-87-L22 Zone 2B & 4B Line
Line 39,23 Zone 2B Division 33 31-Jan-2018 1-Feb-2018 10:30 AM 6-Feb-2018 B comments
Closed
39,23
Installation for sewer GRP manholes sewer main line MH-1-L27 MH-
3541 KHEP-CI-3541
2-L27 Zone 2B Line 27
Line 27 Zone 2B Division 31 31-Jan-2018 1-Feb-2018 10:30 AM 3-Feb-2018 A Approved Closed

Cast in place concrete form work inspection for RC slab first floor & Cluster 60 Approved w/
3542 KHEP-CI-3542
stairs 2nd flight ground floor Cluster 60 BC4 BC4
NA Division 3 1-Feb-2018 3-Feb-2018 10:00 AM 3-Feb-2018 B comments
Closed

Installation of Rein forcing steel bar Embedded item & Closure


Cluster 60
3543 KHEP-CI-3543 Inspection for RC slab first floor & stairs 2nd flight ground floor
BC4
NA Division 3 1-Feb-2018 3-Feb-2018 10:30 AM 3-Feb-2018 A Approved Closed
Cluster 60 BC4
Concrete sampling testing & placement Inspection for RC footing Cluster 59
3544 KHEP-CI-3544
foundation Cluster 59 BC6 BC6
NA Division 3 1-Feb-2018 3-Feb-2018 9:30 AM 4-Feb-2018 A Approved Closed

Concrete sampling testing & placement Inspection for RC column


3545 KHEP-CI-3545
first floor Cluster 54 B2
Cluster 54 B2 NA Division 3 1-Feb-2018 3-Feb-2018 9:30 AM 4-Feb-2018 A Approved Closed

Dam proofing surface preparation for RC grade beam from inside


3546 KHEP-CI-3546
Cluster 33 B2
Cluster 33 B2 NA Division 7 1-Feb-2018 3-Feb-2018 2:00 PM 4-Feb-2018 A Approved Closed

Cast in place concrete form work inspection for RC column ground Cluster 25
3547 KHEP-CI-3547
floor Cluster 25 BC4 BC4
NA Division 3 1-Feb-2018 3-Feb-2018 10:00 AM 3-Feb-2018 A Approved Closed

Termite control surface preparation installation & final inspection for


3548 KHEP-CI-3548
slab on grade Cluster 7 B2
Cluster 7 B2 NA Division 3 1-Feb-2018 3-Feb-2018 9:00 AM 4-Feb-2018 A Approved Closed

Termite control surface preparation installation & final inspection for


3549 KHEP-CI-3549
slab on grade Cluster 10 B2
Cluster 10 B2 NA Division 3 1-Feb-2018 3-Feb-2018 9:00 AM 4-Feb-2018 A Approved Closed

Compaction test around footing general fill 1st layer Cluster 62 BC6 Cluster 62
3550 KHEP-CI-3550
Zone 3B BC6
Zone 3B Division 31 1-Feb-2018 3-Feb-2018 2:30 PM 6-Feb-2018 A Approved Closed

Cast in place concrete form work inspection for RC column first floor
3551 KHEP-CI-3551
axis H-N Cluster 44 A6
Cluster 44 A6 NA Division 3 3-Feb-2018 4-Feb-2018 10:00 AM 5-Feb-2018 A Approved Closed

Installation of Rein forcing steel bar Embedded item & Closure


3552 KHEP-CI-3552
Inspection for RC column first floor axis A-G Cluster 44 A6
Cluster 44 A6 NA Division 3 3-Feb-2018 4-Feb-2018 10:00 AM 5-Feb-2018 A Approved Closed

70cm CMU morter & masonry inspection under exterior reinforced


3553 KHEP-CI-3553
grade beam Cluster 31 B2
Cluster 31 B2 NA Division 4 3-Feb-2018 4-Feb-2018 2:00 PM 4-Feb-2018 A Approved Closed

Concrete sampling testing & placement Inspection for RC first floor Cluster 18
3554 KHEP-CI-3554
slab & stair Cluster 18 BC4 BC4
NA Division 3 3-Feb-2018 4-Feb-2018 9:00 AM 6-Feb-2018 E Rejected Closed

Installation of Rein forcing steel bar Embedded item & Closure Cluster 18
3555 KHEP-CI-3555
Inspection for RC column first floor Cluster 18 BC4 BC4
NA Division 3 3-Feb-2018 4-Feb-2018 2:00 PM 5-Feb-2018 A Approved Closed
Inspection for excavated formation for pipe trench sewer main line
3556 KHEP-CI-3556
Dia 200mm Zone 1B Line 2 MH-5-L01 MH-4-L01
Line 2 Zone 1B Division 31 3-Feb-2018 4-Feb-2018 9:30 AM 6-Feb-2018 A Approved Closed

Inspection form work for base & wall & concrete pouring for storm
catch basin precast yard Zone 2B Line 7,18,1,35 11pic CB-178 MH- Line
3557 KHEP-CI-3557 79-L21 & CB-177- CB-176 MH-105-L27 & CB170 CB171 MH-101-L27 7,18,1,35 Zone 2B Division 33 3-Feb-2018 4-Feb-2018 11:30 AM 5-Feb-2018 A Approved Closed
& CB-169 CB-168 MH-77-L21 & CB-172 CB-173 CB-174 MH-78-L21 & 11pic
CB-167 MH-67-L20
First coat dam proofing installation inspection for CMU morter &
Cluster 28
3558 KHEP-CI-3558 masonry inspection Under Exterior Reinforced Grade Beam Cluster
BC4
NA Division 7 4-Feb-2018 5-Feb-2018 10:00 AM 6-Feb-2018 A Approved Closed
28 BC4
Concrete sampling testing & placement Inspection for RC column Cluster 25
3559 KHEP-CI-3559
ground floor Cluster 25 BC4 BC4
NA Division 3 4-Feb-2018 5-Feb-2018 9:00 AM 6-Feb-2018 E Rejected Closed

Concrete sampling testing & placement Inspection for RC column Cluster 25 Approved w/
3559.1 KHEP-CI-3559-01
ground floor Cluster 25 BC4 BC4
NA Division 3 19-Feb-2018 20-Feb-2018 9:00 AM 24-Feb-2018 B comments
Closed

Concrete sampling testing & placement inspection for RC slab first Cluster 60
3560 KHEP-CI-3560
floor & 2nd flight stairs Cluster 60 BC4 BC4
NA Division 3 4-Feb-2018 5-Feb-2018 9:30 AM 6-Feb-2018 A Approved Closed

Installation of Rein forcing steel bar Embedded item & Closure


3561 KHEP-CI-3561
Inspection for RC column ground floor Cluster 46 A6
Cluster 46 A6 NA Division 3 4-Feb-2018 5-Feb-2018 10:00 AM 7-Feb-2018 A Approved Closed

Installation of Rein forcing steel bar Embedded item & Closure


3562 KHEP-CI-3562
Inspection for RC column first floor Cluster 66 A6
Cluster 66 A6 NA Division 3 4-Feb-2018 5-Feb-2018 10:30 AM 6-Feb-2018 A Approved Closed

Inspection of concrete pouring for storm embedded pice at manhole


3563 KHEP-CI-3563
Zone 1B Line 15 MH-46-L15 one side MH-54-L15 three side
Line 15 Zone 1B Division 33 4-Feb-2018 5-Feb-2018 1:30 PM 6-Feb-2018 A Approved Closed

Installation inspection of precast storm drainage manholes Zone 2B


3564 KHEP-CI-3564
& 3B Line 1,7,21 MH-79-L21 MH-20-L07 MH-I8-L01
Line 1,7,21 Zone 2B & 3B Division 33 4-Feb-2018 5-Feb-2018 11:00 AM 6-Feb-2018 A Approved Closed

Cast in place concrete form work inspection for RC column first floor Cluster 18
3565 KHEP-CI-3565
Cluster 18 BC4 BC4
NA Division 3 5-Feb-2018 6-Feb-2018 9:00 AM 7-Feb-2018 A Approved Closed

First coat dam proofing installation inspection for CMU morter &
Cluster 29
3566 KHEP-CI-3566 masonry inspection under exterior rein forced grade beam Cluster 29
BC4
NA Division 7 5-Feb-2018 6-Feb-2018 10:00 AM 7-Feb-2018 A Approved Closed
BC4
Cast in place concrete form work inspection for RC roof slab floor
3567 KHEP-CI-3567
Cluster 6 BC4
Cluster 6 BC4 NA Division 3 5-Feb-2018 6-Feb-2018 10:00 AM 7-Feb-2018 A Approved Closed

Installation of Rein forcing steel bar Embedded item & Closure


3568 KHEP-CI-3568
Inspection for Rcroof slab Cluster 6 BC4
Cluster 6 BC4 NA Division 3 5-Feb-2018 6-Feb-2018 10:00 AM 7-Feb-2018 A Approved Closed

First coat dam proofing installation inspection for grade beam


3569 KHEP-CI-3569
internal face inside the building Cluster 48 B2
Cluster 48 B2 NA Division 7 5-Feb-2018 6-Feb-2018 2:00 PM 7-Feb-2018 A Approved Closed

Compaction test around footing general fill 4th layer Cluster 38 BC6 Cluster 38
3570 KHEP-CI-3570
Zone 2B BC6
Zone 2B Division 31 5-Feb-2018 6-Feb-2018 2:30 PM 7-Feb-2018 A Approved Closed

Cast in place concrete form work inspection for RC column first floor
3571 KHEP-CI-3571
axis A-G Cluster 44 A6
Cluster 44 A6 NA Division 3 5-Feb-2018 6-Feb-2018 11:00 AM 7-Feb-2018 A Approved Closed

Inspection for gravel bedding Installation under pipe trench with


3572 KHEP-CI-3572 geotextile Protection sheet sewer main line Dia 200mm MH-5-L01 to Line 01 Zone 1B Division 31 6-Feb-2018 7-Feb-2018 10:00 AM 10-Feb-2018 A Approved Closed
MH-4-L01 Zone 1B Line 01
Inspection of pre back filling for mahole sewer main line Zone 1B Approved w/
3573 KHEP-CI-3573
Line 1,2 MH-6-L01 MH-7-L01 MH-9-L02 MH-8-L02
Line 1, 2 Zone 1B Division 31 6-Feb-2018 7-Feb-2018 11:00 AM 10-Feb-2018 B comments
Closed

First coat dam proofing installation inspection for CMU morter &
Cluster 49
3574 KHEP-CI-3574 masonry inspection under exterior reinforced grade beam Cluster 49
BC6
NA Division 7 6-Feb-2018 7-Feb-2018 1:35 PM 7-Feb-2018 A Approved Closed
BC6
First coat dam proofing installation inspection for CMU morter &
Cluster 47
3575 KHEP-CI-3575 masonry inspection under exterior reinforced grade beam Cluster 47
BC6
NA Division 7 6-Feb-2018 7-Feb-2018 1:30 PM 7-Feb-2018 A Approved Closed
BC6
Cast in place concrete form work inspection for RC column ground Cluster 55
3576 KHEP-CI-3576
floor Cluster 55 BC4 BC4
NA Division 3 6-Feb-2018 7-Feb-2018 2:00 PM 10-Feb-2018 A Approved Closed

Installation of reinforcing steel bar & embedded item & form closure Cluster 59
3577 KHEP-CI-3577
inspection for RC column neck Cluster 59 BC6 BC6
NA Division 3 6-Feb-2018 7-Feb-2018 2:30 PM 10-Feb-2018 A Approved Closed

Second coat dam proofing installation inspection for grade beam


3578 KHEP-CI-3578
Internal face inside the building Cluster 48 B2
Cluster 48 B2 NA Division 7 6-Feb-2018 7-Feb-2018 1:40 PM 10-Feb-2018 A Approved Closed

Second coat dam proofing installation inspection for CMU morter &
Cluster 28
3579 KHEP-CI-3579 masonry Inspection under exterior reinforced grade beam Cluster 28
BC4
NA Division 7 6-Feb-2018 7-Feb-2018 10:00 AM 7-Feb-2018 A Approved Closed
BC4
Second coat dam proofing installation inspection for CMU morter &
Cluster 29
3580 KHEP-CI-3580 masonry Inspection under exterior reinforced grade beam Cluster 29
BC4
NA Division 7 6-Feb-2018 7-Feb-2018 10:00 AM 7-Feb-2018 A Approved Closed
BC4
Concrete sampling testing & placement Inspection for RC first foor Cluster 23 Approved w/
3581 KHEP-CI-3581
slab & stair Cluster 23 BC4 BC4
NA Division 3 6-Feb-2018 7-Feb-2018 9:00 AM 7-Feb-2018 B comments
Closed

Concrete sampling testing & placement Inspection for RC column Cluster 37 Approved w/
3582 KHEP-CI-3582
ground floor Cluster 37 BC4 BC4
NA Division 3 6-Feb-2018 7-Feb-2018 9:00 AM 7-Feb-2018 B comments
Closed
Concrete sampling testing & placement Inspection for RC slab on Approved w/
3583 KHEP-CI-3583
grade Cluster 13 B2
Cluster 13 B2 NA Division 3 6-Feb-2018 7-Feb-2018 9:00 AM 7-Feb-2018 B comments
Closed

Dam proofing surface preparation for RC grade beam from inside


3584 KHEP-CI-3584
Cluster 9 BC4
Cluster 9 BC4 NA Division 7 6-Feb-2018 7-Feb-2018 10:00 AM 10-Feb-2018 A Approved Closed

Cast in place concrete form work inspection for RC slab on grade Approved w/
3585 KHEP-CI-3585
Cluster 5 B2
Cluster 5 B2 NA Division 3 6-Feb-2018 7-Feb-2018 9:00 AM 10-Feb-2018 B comments
Closed

Installation of reinforcing steel bar & embedded item & form closure
3586 KHEP-CI-3586
inspection for RC slab on grade Cluster 5 B2
Cluster 5 B2 NA Division 3 6-Feb-2018 7-Feb-2018 9:00 AM 10-Feb-2018 A Approved Closed

Installation of reinforcing steel bar & embedded item & form closure Cluster 23
3587 KHEP-CI-3587
inspection for RC column first floor Cluster 23 BC4 BC4
NA Division 3 6-Feb-2018 7-Feb-2018 11:00 AM 10-Feb-2018 A Approved Closed

Cast in place concrete form work inspection for RC parapet foof slab
3588 KHEP-CI-3588
Cluster 3 A6
Cluster 3 A6 NA Division 3 7-Feb-2018 8-Feb-2018 2:00 PM 13-Feb-2018 A Approved Closed

Installation reinforcing steel bar embedded item & form closure


3589 KHEP-CI-3589
inspection for RC parapet roof slab Cluster 3 A6
Cluster 3 A6 NA Division 3 7-Feb-2018 8-Feb-2018 2:00 PM 13-Feb-2018 A Approved Closed

Installation reinforcing steel bar embedded item & form closure Cluster 36
3590 KHEP-CI-3590
inspection for RC column ground floor Cluster 36 BC4 BC4
NA Division 3 7-Feb-2018 8-Feb-2018 10:00 AM 10-Feb-2018 A Approved Closed

Installation of reinforcing steel bar & embedded item & form closure Cluster 23
3591 KHEP-CI-3591
inspection for RC column first floor Cluster 60 BC4 BC4
NA Division 3 7-Feb-2018 8-Feb-2018 9:00 AM 10-Feb-2018 A Approved Closed

Inspection of gravel fillingabouve the pipe trench with geotextile


3592 KHEP-CI-3592 protection sheet sewer mian line Dia 200mm MH-6-L01 MH-5-L01 Line 1 Zone 1B Division 31 7-Feb-2018 8-Feb-2018 9:00 AM 10-Feb-2018 A Approved Closed
Zone 1B Line 1
Compaction test around footing general fill 2nd layer Zone 3B Cluster Cluster 62
3593 KHEP-CI-3593
62 BC6 BC6
Zone 3B Division 31 7-Feb-2018 8-Feb-2018 2:30 PM 11-Feb-2018 A Approved Closed

Inspection of dam Proofing Surface Preparation for Storm Manhole


3594 KHEP-CI-3594 Precast yard Zone 1B, 4B Line 4,29,32 MH-I13-L04 MH-I104-L28 Line 4,29,32 Zone 1B, 4B Division 33 7-Feb-2018 8-Feb-2018 10:30 AM 10-Feb-2018 A Approved Closed
MH-I103-L29 MH-I102-L28 MH-I112-L32 MH-I99-L27 MH-I72-L20

First coat dam proofing installation inspection for CMU morter &
Cluster 39
3595 KHEP-CI-3595 masonry inspection under exterior reinforced grade beam Cluster 39
BC6
NA Division 3 7-Feb-2018 8-Feb-2018 10:00 AM 10-Feb-2018 A Approved Closed
BC6
Cast in place concrete form work inspection for RC slab on grade Approved w/
3596 KHEP-CI-3596
Cluster 10 B2
Cluster 10 B2 NA Division 3 7-Feb-2018 8-Feb-2018 10:00 AM 12-Feb-2018 B comments
Closed

Installation of reinforcing steel bar & embedded item & form closure Approved w/
3597 KHEP-CI-3597
inspection for RC slab on grade Cluster 10 B2
Cluster 10 B2 NA Division 3 7-Feb-2018 8-Feb-2018 10:00 AM 12-Feb-2018 B comments
Closed

Cast in place concrete form work inspection for RC slab first floor &
3598 KHEP-CI-3598
2nd flight stair Cluster 63 B2
Cluster 63 B2 NA Division 3 7-Feb-2018 8-Feb-2018 10:30 AM 10-Feb-2018 A Approved Closed

Installation of reinforcing steel bar & embedded item & form closure
3599 KHEP-CI-3599
inspection for RC slab first floor & 2nd flight stair Cluster 63 B2
Cluster 63 B2 NA Division 3 7-Feb-2018 8-Feb-2018 1:30 PM 10-Feb-2018 A Approved Closed

Cast in place concrete form work inspection for RC column first floor Cluster 23
3600 KHEP-CI-3600
Cluster 23 BC4 BC4
NA Division 3 8-Feb-2018 10-Feb-2018 10:00 AM 11-Feb-2018 A Approved Closed

Cast in place concrete form work inspection for RC roof slab Cluster Approved w/
3601 KHEP-CI-3601
33 B2
Cluster 33 B2 NA Division 3 8-Feb-2018 10-Feb-2018 10:00 AM 12-Feb-2018 B comments
Closed

Installation of reinforcing steel bar & embedded item & form closure
3602 KHEP-CI-3602
inspection for RC roof slab Cluster 33 B2
Cluster 33 B2 NA Division 3 8-Feb-2018 10-Feb-2018 10:00 AM 12-Feb-2018 A Approved Closed

Compaction test first layer pre final layer for back filling under slan
3603 KHEP-CI-3603
on grade Cluster 11 B2
Cluster 11 B2 NA Division 3 8-Feb-2018 10-Feb-2018 10:00 AM 13-Feb-2018 A Approved Closed

Compaction test first layer pre final layer for back filling under slan
3604 KHEP-CI-3604
on grade Cluster 12 B2
Cluster 12 B2 NA Division 3 8-Feb-2018 10-Feb-2018 10:00 AM 13-Feb-2018 A Approved Closed

Concrete sampling testing & placement inspection for RC cloumn first Cluster 18
3605 KHEP-CI-3605
floor Cluster 18 BC4 BC4
NA Division 3 8-Feb-2018 10-Feb-2018 9:00 AM 11-Feb-2018 A Approved Closed

Concrete sampling testing & placement inspection for RC cloumn first


3606 KHEP-CI-3606
floor Cluster 44 A6
Cluster 44 A6 NA Division 3 8-Feb-2018 10-Feb-2018 9:00 AM 11-Feb-2018 A Approved Closed

Concrete sampling testing & placement inspection for RC slab on


3607 KHEP-CI-3607
grade Cluster 5 B2
Cluster 5 B2 NA Division 3 8-Feb-2018 10-Feb-2018 9:00 AM 11-Feb-2018 A Approved Closed

Second coat dam proofing installation inspection for CMU mortar &
Cluster 39
3608 KHEP-CI-3608 masonry inspection under exterior reinforced grade beam Cluster 39
BC6
NA Division 7 8-Feb-2018 10-Feb-2018 10:00 AM 11-Feb-2018 A Approved Closed
BC6

Cast in place concrete form work inspection for RC column ground


3609 KHEP-CI-3609
floor coverage inside the grid line if F-N / 1-6 Cluster 46 A6
Cluster 46 A6 NA Division 3 8-Feb-2018 10-Feb-2018 10:30 AM 11-Feb-2018 A Approved Closed

Cast in place concrete form work inspection for RC column first floor Approved w/
3610 KHEP-CI-3610
coverage inside the grid line if K-N / 1-6 Cluster 66 A6
Cluster 66 A6 NA Division 3 8-Feb-2018 10-Feb-2018 10:40 AM 11-Feb-2018 B comments
Closed

First coat dam proofing installation inspection for RC grade beam


3611 KHEP-CI-3611
internal face only inside the building Cluster 73 B2
Cluster 73 B2 NA Division 3 8-Feb-2018 10-Feb-2018 10:00 AM 11-Feb-2018 A Approved Closed
First coat dam proofing installation inspection for RC grade beam
3612 KHEP-CI-3612
internal face only inside the building Cluster 71 B2
Cluster 71 B2 NA Division 3 8-Feb-2018 10-Feb-2018 2:00 PM 11-Feb-2018 A Approved Closed

3613 KHEP-CI-3613 Cast in place concrete for RC column first floor Cluster 60 B2 Cluster 60 B2 NA Division 3 8-Feb-2018 10-Feb-2018 9:30 AM 11-Feb-2018 A Approved Closed

Second coat dam proofing installation inspection for CMU mortar &
Cluster 47
3614 KHEP-CI-3614 masonry inspection under exterior reinforced grade beam Cluster 47
BC6
NA Division 7 8-Feb-2018 10-Feb-2018 1:30 PM 11-Feb-2018 A Approved Closed
BC6
Second coat dam proofing installation inspection for CMU mortar &
Cluster 49
3615 KHEP-CI-3615 masonry inspection under exterior reinforced grade beam Cluster 49
BC6
NA Division 7 8-Feb-2018 10-Feb-2018 1:35 PM 11-Feb-2018 A Approved Closed
BC6
Cast in place concrete form work inspection for grade beam Cluster
3616 KHEP-CI-3616
45 A6
Cluster 45 A6 NA Division 3 8-Feb-2018 10-Feb-2018 9:35 AM 13-Feb-2018 A Approved Closed

Installation of reinforcing steel bar & embedded item & form closure
3617 KHEP-CI-3617
inspection for RC grade beams Cluster 45 A6
Cluster 45 A6 NA Division 3 8-Feb-2018 10-Feb-2018 9:40 AM 13-Feb-2018 A Approved Closed

Second coat bituminous Dam Proofing Installation Inspection for


3618 KHEP-CI-3618 sewer manhole base precast yard Zone 3B & 4B Line 1 MH-16-L01 Line 1 Zone 3B & 4B Division 33 8-Feb-2018 10-Feb-2018 1:30 PM 11-Feb-2018 A Approved Closed
MH-17-L01 MH-18-L01 MH-19-L01 MH-20-L01 MH-21-L01

Blinding concrete sampling testing & placement for manhole sewer


3619 KHEP-CI-3619
main line MH-5-L27 MH-4-L27 Zone 2B Line 27
Line 27 Zone 2B Division 31 8-Feb-2018 10-Feb-2018 11:30 AM 11-Feb-2018 A Approved Closed

Blinding concrete sampling testing & placement for manhole sewer


3620 KHEP-CI-3620
main line MH-I5-L02 Zone 1B Line 2
Line 2 Zone 1B Division 31 8-Feb-2018 10-Feb-2018 11:00 AM 11-Feb-2018 A Approved Closed

Cast in place concrete form work inspection for RC slabs & beams
3621 KHEP-CI-3621
roof floor Cluster 73 B2
Cluster 73 B2 NA Division 3 10-Feb-2018 11-Feb-2018 2:00 PM 12-Feb-2018 A Approved Closed

installation of reinforced steel bar embedded item & form closure


3622 KHEP-CI-3622
inspection for RC slab & beams roof floor Cluster 73 B2
Cluster 73 B2 NA Division 3 10-Feb-2018 11-Feb-2018 2:30 PM 12-Feb-2018 A Approved Closed

Second coat dam proofing installation for grade beam internal face
3623 KHEP-CI-3623
only inside the building Cluster 73 B2
Cluster 73 B2 NA Division 3 10-Feb-2018 11-Feb-2018 1:30 PM 12-Feb-2018 A Approved Closed

Second coat dam proofing installation for grade beam internal face
3624 KHEP-CI-3624
only inside the building Cluster 71 B2
Cluster 71 B2 NA Division 3 10-Feb-2018 11-Feb-2018 1:35 PM 12-Feb-2018 A Approved Closed

Concrete sampling testing & placement inspection for RC column Cluster 55 Approved w/
3625 KHEP-CI-3625
ground floor Cluster 55 BC4 BC4
NA Division 3 10-Feb-2018 11-Feb-2018 9:30 AM 13-Feb-2018 B comments
Closed

Cast in place concrete form work inspection for RC column first floor
3626 KHEP-CI-3626
column GL(2&N), GL(3&L,M,N), GL(5&K,L) Cluster 66 A6
Cluster 66 A6 NA Division 3 10-Feb-2018 11-Feb-2018 10:40 AM 12-Feb-2018 A Approved Closed

First coat dam proofing installation inspection for grade beam inside Approved w/
3627 KHEP-CI-3627
Cluster 33 B2
Cluster 33 B2 NA Division 7 10-Feb-2018 11-Feb-2018 10:00 AM 12-Feb-2018 B comments
Closed

First coat dam proofing installation inspection for CMU mortar &
3628 KHEP-CI-3628 masonry inspection under exterior reinforced grade beam Cluster 31 Cluster 31 B2 NA Division 7 10-Feb-2018 11-Feb-2018 10:00 AM 12-Feb-2018 A Approved Closed
B2
Dam proofing surface preparation for RC grade beam from inside Approved w/
3629 KHEP-CI-3629
Cluster 6 BC4
Cluster 6 BC4 NA Division 7 10-Feb-2018 11-Feb-2018 10:00 AM 12-Feb-2018 B comments
Closed

Cast in place concrete form work inspection for RC grade beam Cluster 41
3630 KHEP-CI-3630
Cluster 41 BC4 BC4
NA Division 3 10-Feb-2018 11-Feb-2018 10:00 AM 13-Feb-2018 A Approved Closed

Installation of reinforcing steel bar embedded item & form closure Cluster 41
3631 KHEP-CI-3631
inspection for RC graade beam Cluster 41 BC4 BC4
NA Division 3 10-Feb-2018 11-Feb-2018 10:00 AM 12-Feb-2018 A Approved Closed

Concrete sampling testing & Placement inspection for RC roof slab


3632 KHEP-CI-3632
Cluster 6 BC4
Cluster 6 BC4 NA Division 3 10-Feb-2018 11-Feb-2018 9:00 AM 12-Feb-2018 E Rejected Closed

Inspection of laying warning tape installation sewer main line Dia Ø


3633 KHEP-CI-3633
200mm Zone 1B Line 1 MH-6-L01 MH-5-L01
Line 1 Zone 1B Division 31 10-Feb-2018 11-Feb-2018 9:00 AM 11-Feb-2018 A Approved Closed

Inspection form work & concrete pouring for sewer embedded Pice
3634 KHEP-CI-3634 at Manhole Zone 1B Line 1,2 MH-4-L01 MH-5-L02 MH-3-L02 one side Line 1, 2 Zone 1B Division 31 10-Feb-2018 11-Feb-2018 2:30 PM 13-Feb-2018 A Approved Closed
MH-6-L02 MH-2-L02 two side MH-2-A-L02 MH-1-L02 two side

Inspection for mwork & concrete pouring for sewer back drop pice
3635 KHEP-CI-3635 from IC to MH 160mm at manhole First Stage MH-2-L020 MH-2-A- Line 1 Zone 1B Division 31 10-Feb-2018 11-Feb-2018 11:30 AM 13-Feb-2018 A Approved Closed
L02 MH1-L02 Line 2 Zone 1B
Cast in place concrete form work inspection for RC slab on grade
3636 KHEP-CI-3636
Cluster 7 B2
Cluster 7 B2 NA Division 3 10-Feb-2018 11-Feb-2018 10:00 AM 13-Feb-2018 A Approved Closed

Installation of reinforcing steel bar embedded item & form closure Approved w/
3637 KHEP-CI-3637
inspection for RC slab on grade Cluster 7 B2
Cluster 7 B2 NA Division 3 10-Feb-2018 11-Feb-2018 10:00 AM 13-Feb-2018 B comments
Closed

Concrete sampling testing & placement inspection for RC slab First


3638 KHEP-CI-3638
floor & 2nd flight stair Cluster 63 B2
Cluster 63 B2 NA Division 3 11-Feb-2018 12-Feb-2018 9:30 AM 13-Feb-2018 E Rejected Closed

Concrete sampling testing & placement inspection for RC column Approved w/


3639 KHEP-CI-3639
ground floor coverage grid line F-N / 1-6 Cluster 46 A6
Cluster 46 A6 NA Division 3 11-Feb-2018 12-Feb-2018 9:30 AM 13-Feb-2018 B comments
Closed
Inspection of Reinforcement steel bar & internal shutter from storm
3640 KHEP-CI-3640 manholes precast yard MH-137-L40 MH-108-L27 MH-76-L18 Line Line 18,27,40 Zone 3B,4B,5C Division 33 11-Feb-2018 12-Feb-2018 2:00 PM 13-Feb-2018 A Approved Closed
18,27,40 Zone 3B,4B,5C
First Coat Bituminous damproofing installation inspection for storm
Line
manholes Precast yard MH-64-L18 MH-75-L18 MH-95-L27 MH-120-
3641 KHEP-CI-3641
L26 MH MH-129-L34 MH-130-L34 MH-135-L38 Zone 3B,4B,5C Line
18,24,26,34,3 Zone 3B,4B,5C Division 33 11-Feb-2018 12-Feb-2018 2:00 PM 13-Feb-2018 A Approved Closed
8
18,24,26,34,38
First coat bituminous damproofing installation inspection for storm
manholes Precast yard MH-61-L18 MH-62-L18 MH-63-L21 MH-119- Line
3642 KHEP-CI-3642
L26 MH-92-L21 MH-133-L36 MH-134-L37 Zone 3B,4B,5C Line 18,26,36,37
Zone 3B,4B,5C Division 33 11-Feb-2018 12-Feb-2018 2:00 PM 13-Feb-2018 A Approved Closed
18,26,36,37
Compaction test around footing general fill 4th layerZone 2B Cluster Cluster 29
3643 KHEP-CI-3643
29 BC4 BC4
Zone 2B Division 31 11-Feb-2018 12-Feb-2018 2:30 PM 13-Feb-2018 A Approved Closed

Compaction test excavated Formation Level bottom of Foundation Public Toilet


3644 KHEP-CI-3644
Zone 1B, Public Toilet B2 B2
Zone 1B Division 31 11-Feb-2018 12-Feb-2018 9:00 AM 13-Feb-2018 A Approved Closed

Second coat damproofing installation inspection for CMU, Morter and


3645 KHEP-CI-3645 Masonry inspection under exterior reinforced grade beam Cluster 31, Cluster 31, B2 NA N/A 11-Feb-2018 12-Feb-2018 10:00 AM 13-Feb-2018 A Approved Closed
B2
Second coat damproofing installation inspection for gradebeam inside
3646 KHEP-CI-3646
Cluster 33 B2
Cluster 33 B2 NA N/A 11-Feb-2018 12-Feb-2018 10:00 AM 13-Feb-2018 A Approved Closed

First coat damproofing application inspection for grade beam inside


3647 KHEP-CI-3647
Cluster 9 BC4
Cluster 9 BC4 NA N/A 11-Feb-2018 12-Feb-2018 10:00 AM 13-Feb-2018 A Approved Closed

Cast in place concrete formwork inspection for RC column first floor


3648 KHEP-CI-3648
Cloumn grid A-J / 1-6 Cluster 66 A6
Cluster 66 A6 NA Division 3 11-Feb-2018 12-Feb-2018 2:00 PM 13-Feb-2018 A Approved Closed

Compaction test second coat layer for backfilling under slab on grade
3649 KHEP-CI-3649
axis A-E Cluster 11 B2
Cluster 11 B2 NA N/A 11-Feb-2018 12-Feb-2018 10:00 AM 13-Feb-2018 A Approved Closed

Concrete sampling testing & placement inspection for RC parapet


3650 KHEP-CI-3650
roof slab Cluster 3 A6
Cluster 3 A6 NA Division 3 12-Feb-2018 13-Feb-2018 9:00 AM 14-Feb-2018 A Approved Closed

Concrete sampling testing & placement inspection for RC column first Cluster 23
3651 KHEP-CI-3651
floor Cluster 23 BC4 BC4
NA Division 3 12-Feb-2018 13-Feb-2018 9:00 AM 14-Feb-2018 A Approved Closed

Concrete sampling testing & placement inspection for RC slab on


3652 KHEP-CI-3652
grade Cluster 10 B2
Cluster 10 B2 NA Division 3 12-Feb-2018 13-Feb-2018 9:00 AM 14-Feb-2018 A Approved Closed

First coat damproofing installation inspection for grade beam inside


3653 KHEP-CI-3653
Cluster 6 BC4
Cluster 6 BC4 NA Division 3 12-Feb-2018 13-Feb-2018 10:00 AM 14-Feb-2018 A Approved Closed

3654 KHEP-CI-3654 Compaction test final layer under slab on grade Cluster 12 B2 Cluster 12 B2 NA Division 3 12-Feb-2018 13-Feb-2018 10:00 AM 14-Feb-2018 A Approved Closed

Concrete sampling testing & placement inspection for RC grade beam Cluster 42 Approved w/
3655 KHEP-CI-3655
Cluster 42 BC4 BC4
NA Division 3 12-Feb-2018 13-Feb-2018 9:00 AM 14-Feb-2018 B comments
Closed

Compaction test 1st & final layer selected fill bottom of foundation Plublic Toilet
3656 KHEP-CI-3656
Public Toilet B2 Zone 5A B2
Zone 5A Division 31 12-Feb-2018 13-Feb-2018 2:00 PM 14-Feb-2018 A Approved Closed

Inspection of excavated & compaction formation for storm manhole


3657 KHEP-CI-3657
along alley 6 Zone 2B Line 2
Line 2 Zone 2B Division 31 12-Feb-2018 13-Feb-2018 2:00 PM 14-Feb-2018 A Approved Closed

Cast in place concrete form work inspection for RC column neck Cluster 59
3658 KHEP-CI-3658
Cluster 59 BC6 BC6
NA Division 3 12-Feb-2018 13-Feb-2018 9:00 AM 14-Feb-2018 A Approved Closed

Installation of reinforcing steel bar embedded item & form closure Cluster 42
3659 KHEP-CI-3659
inspection for RC cloumn ground floor Cluster 42 BC4 BC4
NA Division 3 12-Feb-2018 13-Feb-2018 10:00 AM 14-Feb-2018 A Approved Closed

Cast in place concrete formwork inspection for RC first floor slab & Cluster 22
3660 KHEP-CI-3660
stairs Cluster 22 BC4 BC4
NA Division 3 12-Feb-2018 13-Feb-2018 10:00 AM 19-Feb-2018 A Approved Closed

Installation of reinforcing steel bar embedded item & form closure Cluster 22
3661 KHEP-CI-3661
inspection for RC first floor slab & stairs Cluster 22 BC4 BC4
NA Division 3 12-Feb-2018 13-Feb-2018 10:00 AM 19-Feb-2018 A Approved Closed

Second coat damproofing installation inspection for CMU Mortar &


3662 KHEP-CI-3662 masonry inspection under exterior reinforced grade beam Cluster 9 Cluster 9 BC4 NA Division 7 12-Feb-2018 13-Feb-2018 10:00 AM 14-Feb-2018 A Approved Closed
BC4

Inspection of excavated & compaction formation for sewer manholes


3663 KHEP-CI-3663
along alley 6 & 14 MH-3-L27 MH-1-A-L29 Zone 2B Line 27, 29
Line 27, 29 Zone 2B Division 31 12-Feb-2018 13-Feb-2018 2:00 PM 14-Feb-2018 A Approved Closed

Inspection of sandfilling & laying of warning tape around the sewer


3664 KHEP-CI-3664 manholes along Road 2 & Alley 1,11 MH-1-L32 MH-8-L02 MH-9-L02 Line 32,2 & 3 Zone 1B Division 31 12-Feb-2018 13-Feb-2018 9:00 AM 13-Feb-2018 A Approved Closed
MH-1-L03 MH-2-L03 Zone 1B Line 32,2 & 3
Cast in place concrete formwork inspection for RC column ground Cluster 42
3665 KHEP-CI-3665
floor Cluster 42 BC4 BC4
NA Division 3 13-Feb-2018 14-Feb-2018 10:00 AM 14-Feb-2018 A Approved Closed

Second coat damproofing installation inspection for grade beam


3666 KHEP-CI-3666
inside Cluster 6 BC4
Cluster 6 BC4 NA Division 7 13-Feb-2018 14-Feb-2018 10:00 AM 14-Feb-2018 A Approved Closed

Cast in place concrete formwork inspection for RC first floor slab &
3667 KHEP-CI-3667
stair Cluster 43 A6
Cluster 43 A6 NA Division 3 13-Feb-2018 14-Feb-2018 10:00 AM 14-Feb-2018 A Approved Closed
Installation of reinforcing steel bar embedded item & form closure
3668 KHEP-CI-3668
inspection for RC first floor slab & stairs Cluster 43 A6
Cluster 43 A6 NA Division 3 13-Feb-2018 14-Feb-2018 10:00 AM 14-Feb-2018 A Approved Closed

Concrete sampling testing & placement inspection for RC slab on


3669 KHEP-CI-3669
grade Cluster 7 B2
Cluster 7 B2 NA Division 3 13-Feb-2018 14-Feb-2018 11:00 AM 17-Feb-2018 E Rejected Closed

Inspection of gravel filling above the pipe trench with geotextile


3670 KHEP-CI-3670 protection sheet sewer main line Dia 200mm MH-7-L02 MH-5-L02 Line 2 Zone 1B Division 31 13-Feb-2018 14-Feb-2018 9:00 AM 17-Feb-2018 A Approved Closed
Zone 1B Line 2
Inspection of gravel filling above the pipe trench with geotextile
protection sheet sewer main line Dia 200mm MH-3-L02 MH-2-L02
3671 KHEP-CI-3671
MH-2-L02 MH2-A-L02 MH-2-A-L02 MH-1-L02 MH-1-L02 MH-4-L01
Line 2 Zone 1B Division 31 13-Feb-2018 14-Feb-2018 10:00 AM 17-Feb-2018 A Approved Closed
Zone 1B Line 2
Concrete sampling testing & placement inspection for RC column first Cluster 60 Approved w/
3672 KHEP-CI-3672
floor Cluster 60 BC4 BC4
NA Division 3 13-Feb-2018 14-Feb-2018 9:30 AM 14-Feb-2018 B comments
Closed

Concrete sampling testing & placement inspection for RC column first Approved w/
3673 KHEP-CI-3673
floor coverage grid line K-N / 1-6 Cluster 66 A6
Cluster 66 A6 NA Division 3 13-Feb-2018 14-Feb-2018 9:30 AM 14-Feb-2018 B comments
Closed

Compaction test around footing general fill 5th layer Zone 2B Cluster Cluster 28
3674 KHEP-CI-3674
28 BC4 BC4
Zone 2B Division 31 13-Feb-2018 14-Feb-2018 9:30 AM 14-Feb-2018 A Approved Closed

Compaction test around footing general fill 4th layer Zone 3B Cluster Cluster 49
3675 KHEP-CI-3675
49 BC6 BC6
Zone 3B Division 31 13-Feb-2018 14-Feb-2018 9:30 AM 14-Feb-2018 A Approved Closed

Concrete sampling testing & placement inspection for RC column


3676 KHEP-CI-3676
ground floor coverage grid line A-E / 1-6 Cluster 46 A6
Cluster 46 A6 NA Division 3 13-Feb-2018 14-Feb-2018 10:00 AM 14-Feb-2018 A Approved Closed

Inspection formwork & concrete pouring for sewer back drop pice
3677 KHEP-CI-3677 from IC to MH 160mm at manhole second stage MH-2-L02 MH-2-A- Line 2 Zone 1B Division 31 13-Feb-2018 14-Feb-2018 2:30 PM 17-Feb-2018 E Rejected Closed
L02 MH-1-L02 MH-6-L02 Zone 1B Line 2
Inspection formwork & concrete pouring for sewer back drop pice
3677.1 KHEP-CI-3677-01 from IC to MH 160mm at manhole second stage MH-2-L02 MH-2-A- Line 2 Zone 1B Division 31 19-Feb-2018 20-Feb-2018 2:30 PM Open
L02 MH-1-L02 MH-6-L02 Zone 1B Line 2

Compaction test of sand filling up to the pipe 2nd laying warning


3678 KHEP-CI-3678
tape around manhole storm main line MH-I53-L16 Zone 1B Line 16
Line 16 Zone 1B Division 31 13-Feb-2018 14-Feb-2018 11:00 AM 17-Feb-2018 A Approved Closed

Concrete sampling testing & placement inspection for RC roof slab Approved w/
3679 KHEP-CI-3679
Cluster 33 B2
Cluster 33 B2 NA Division 3 14-Feb-2018 15-Feb-2018 11:00 AM 17-Feb-2018 B comments
Closed

Concrete sampling testing & placement inspection for RC grade beam Cluster 41 Approved w/
3680 KHEP-CI-3680
Cluster 41 BC4 BC4
NA Division 3 14-Feb-2018 15-Feb-2018 11:00 AM 17-Feb-2018 B comments
Closed

Installation of reinforcing steel bar embedded item & form closure


Cluster 41
3681 KHEP-CI-3681 inspection for RC column exclouding axis
BC4
NA Division 3 14-Feb-2018 15-Feb-2018 2:00 PM 17-Feb-2018 A Approved Closed
A3,A5,A6,B3,D3,F3,H3,J3,J5,J6 Cluster 41 BC4
Installation of reinforcing steel bar embedded item & form closure
3682 KHEP-CI-3682 inspection for RC column ground floor coverage grid line A-G / 1-6 Cluster 45 A6 NA Division 3 14-Feb-2018 15-Feb-2018 8:30 AM 17-Feb-2018 A Approved Closed
Cluster 45 A6
Concrete sampling testing & placement inspection for RC slab & RC Approved w/
3683 KHEP-CI-3683
beams roof floor Cluster 73 B2
Cluster 73 B2 NA Division 3 14-Feb-2018 15-Feb-2018 9:30 AM 17-Feb-2018 B comments
Closed

Concrete sampling testing & placement inspection for RC column first


3684 KHEP-CI-3684
floor coverage grid line A-J / 1-6 Cluster 66 A6
Cluster 66 A6 NA Division 3 14-Feb-2018 15-Feb-2018 9:30 AM 17-Feb-2018 E Rejected Closed

Concrete sampling testing & placement inspection for RC grade Approved w/


3685 KHEP-CI-3685
beams Cluster 45 A6
Cluster 45 A6 NA Division 3 14-Feb-2018 15-Feb-2018 9:30 AM 17-Feb-2018 B comments
Closed

Installation of reinforcing steel bar embedded item & form closure


3686 KHEP-CI-3686
inspection for RC column first floor Cluster 63 B2
Cluster 63 B2 NA Division 3 14-Feb-2018 15-Feb-2018 9:00 AM 17-Feb-2018 A Approved Closed

Compaction test around footing general fill final layer Zone 2B Cluster 29
3687 KHEP-CI-3687
Cluster 29 BC4 BC4
Zone 2B Division 31 14-Feb-2018 15-Feb-2018 9:30 AM 17-Feb-2018 A Approved Closed

Compaction test around footing general fill 3rd layer Zone 3B Cluster Cluster 62
3688 KHEP-CI-3688
62 BC6 BC6
Zone 3B Division 31 14-Feb-2018 15-Feb-2018 11:30 AM 17-Feb-2018 A Approved Closed

Compaction test around footing general fill 5th layer Zone 2B Cluster Cluster 39
3689 KHEP-CI-3689
39 BC6 BC6
Zone 2B Division 31 14-Feb-2018 15-Feb-2018 11:30 AM 17-Feb-2018 A Approved Closed

Inspection of excavated formation for pipe trench sewer main line


3690 KHEP-CI-3690
Dia 200mm MH-4-L01 to MH-3-L01 Zone 1B Line 1
Line 1 Zone 1B Division 31 14-Feb-2018 15-Feb-2018 10:30 AM 17-Feb-2018 A Approved Closed

Inspection formwork for base & wall & concrete pouring for storm
Approved w/
3691 KHEP-CI-3691 manholes precast yard MH-137-L40 MH-108-L27 MH-76-L18 Zone Line 18,27,40 Zone 3B,4B,5C Division 33 14-Feb-2018 15-Feb-2018 10:00 AM 20-Feb-2018 B comments
Closed
3B,4B,5C Line 18,27,40
Inspection reinforcement steel bar for cover slab & concrete pouring
for storm manholes precast yard MH-29a-L07 MH29-L07 MH54-L15
3692 KHEP-CI-3692
MH-55-L15 MH56-L15 MH57-L15 MH-58-L15 MH44-L14 MH-43-L14
Line 7,14,15 Zone 1B,2B Division 33 14-Feb-2018 15-Feb-2018 10:30 AM 18-Feb-2018 A Approved Closed
Zone 1B,2B Line 7,14,15
Check the survey work elevation & coordinate for blinding of footing
3693 KHEP-CI-3693
Public Toilet Type A-PTA
Public Toilet Type A-PTA Division 3 14-Feb-2018 15-Feb-2018 2:00 PM 17-Feb-2018 A Approved Closed

Cast in place concrete sampling form work inspection for RC slab first Cluster 50
3694 KHEP-CI-3694
floor & 2nd flight stair Cluster 50 BC4 BC4
NA Division 3 15-Feb-2018 17-Feb-2018 10:00 AM 19-Feb-2018 A Approved Closed
Installation of reinforcing steel bar embedded item & form closure Cluster 50
3695 KHEP-CI-3695
inspection for RC slab first floor & 2nd flight stair Cluster 50 BC4 BC4
NA Division 3 15-Feb-2018 17-Feb-2018 10:30 AM 18-Feb-2018 A Approved Closed

Damproofing surface preparation for RC fooring & column neck Cluster 53


3696 KHEP-CI-3696
Cluster 53 BC6 BC6
NA Division 3 15-Feb-2018 17-Feb-2018 10:45 AM 18-Feb-2018 A Approved Closed

Concrete sampling testing & placement inspection for RC grade beam Cluster 26 Approved w/
3697 KHEP-CI-3697
Cluster 26 BC4 BC4
NA Division 3 15-Feb-2018 17-Feb-2018 11:00 AM 18-Feb-2018 B comments
Closed

Termite control surface preparation installation & final inspection for


3698 KHEP-CI-3698
slab on grade Cluster 11 B2
Cluster 11 B2 NA Division 3 15-Feb-2018 17-Feb-2018 9:00 AM 18-Feb-2018 A Approved Closed

Termite control surface preparation installation & final inspection for


3699 KHEP-CI-3699
slab on grade Cluster 12 B2
Cluster 12 B2 NA Division 3 15-Feb-2018 17-Feb-2018 9:00 AM 18-Feb-2018 A Approved Closed

Termite control surface preparation installation & final inspection for


3700 KHEP-CI-3700
footing Public Toilet Type A-PTA
Public Toilet Type A-PTA Division 3 15-Feb-2018 17-Feb-2018 9:00 AM 18-Feb-2018 A Approved Closed

Installation of reinforcing steel bar embedded item & form closure Cluster 26
3701 KHEP-CI-3701
inspection for RC cloumn ground floor Cluster 26 BC4 BC4
NA Division 3 15-Feb-2018 17-Feb-2018 10:00 AM 18-Feb-2018 A Approved Closed

70cm CMU morter & masonry inspection under exterior reinforced Cluster 38 Approved w/
3702 KHEP-CI-3702
grade beam Cluster 38 BC6 BC6
NA Division 4 15-Feb-2018 17-Feb-2018 2:00 PM 19-Feb-2018 B comments
Closed

Installation of reinforcing steel bar embedded item & form closure


Cluster 41
3703 KHEP-CI-3703 inspection for RC cloumn axis A3,A5,A6,B3,D3,F3,H3,J3,J5,J6 Cluster
BC4
NA Division 3 15-Feb-2018 17-Feb-2018 10:00 AM 18-Feb-2018 A Approved Closed
41 BC4
Concrete sampling testing & placement inspection for RC column Cluster 42 Approved w/
3704 KHEP-CI-3704
ground floor Cluster 42 BC4 BC4
NA Division 3 15-Feb-2018 17-Feb-2018 11:00 AM 18-Feb-2018 B comments
Closed

Cast in place concrete formwork inspection for RC column ground Cluster 36


3705 KHEP-CI-3705
floor Cluster 36 BC4 BC4
NA Division 3 15-Feb-2018 17-Feb-2018 10:00 AM 19-Feb-2018 A Approved Closed

Inspection of excavated & compaction formation for sewer manholes


3706 KHEP-CI-3706
sewer main line MH-1-L30 MH-2-L30 MH-3-L30 Line 30 Zone 2B
Line 30 Zone 2B Division 31 15-Feb-2018 17-Feb-2018 11:30 AM 19-Feb-2018 A Approved Closed

Installation for sewer GRP manholes sewer main line MH-4-L27 MH-
3707 KHEP-CI-3707
5-L27 MH-1-A-L09 Line 09,27 Zone 2B
Line 09,27 Zone 2B Division 31 15-Feb-2018 17-Feb-2018 10:30 AM 19-Feb-2018 A Approved Closed

Compaction test around footing general fill final layer Zone 3B Cluster 49
3708 KHEP-CI-3708
Cluster 49 BC6 BC6
Zone 3B Division 31 15-Feb-2018 17-Feb-2018 9:30 AM 19-Feb-2018 A Approved Closed

Compaction test around footing general fill final layer Zone 2B Cluster 28
3709 KHEP-CI-3709
Cluster 28 BC4 BC4
Zone 2B Division 31 15-Feb-2018 17-Feb-2018 10:30 AM 19-Feb-2018 A Approved Closed

Inspection form work & concrete pouring for sewer embedded pice
at manhole MH-15-L01 MH5-L01 MH-4-L01 MH-3-L12 one side MH-
3710 KHEP-CI-3710
14-L01 MH-12-L01 MH-9-L01 three side MH-13-L01 MH-11-L01 MH-
Line 1 Zone 1B Division 31 15-Feb-2018 17-Feb-2018 2:30 PM 19-Feb-2018 A Approved Closed
10-L01 MH-2-L12 MH-1-L12 two side Zone 1B Line 1

Dam proofong surface preparation for RC foundation & column neck Cluster 32
3711 KHEP-CI-3711
Cluster 32 BC6 BC6
NA Division 07 15-Feb-2018 17-Feb-2018 10:40 AM 18-Feb-2018 A Approved Closed

Dam proofong surface preparation for RC grade beam internal face


3712 KHEP-CI-3712
only Cluster 34 B2
Cluster 34 B2 NA Division 07 15-Feb-2018 17-Feb-2018 10:30 AM 18-Feb-2018 A Approved Closed

Cast in place concrete formwork inspection for RC column ground Approved w/


3713 KHEP-CI-3713
floor coverage grid line A-H / 1-6 Cluster 45 A6
Cluster 45 A6 NA Division 3 15-Feb-2018 17-Feb-2018 3:00 PM 19-Feb-2018 B comments
Closed

Installation of reinforcing steel bar embedded item & form closure


3714 KHEP-CI-3714
inspection for RC columns first floor Cluster 43 A6
Cluster 43 A6 NA Division 3 15-Feb-2018 17-Feb-2018 11:00 AM 18-Feb-2018 A Approved Closed

Cast in place concretee form work inspection for RC column ground Cluster 41
3715 KHEP-CI-3715
floor axis A-J / 1-6 Cluster 41 BC4 BC4
NA Division 3 15-Feb-2018 17-Feb-2018 1:20 PM 19-Feb-2018 A Approved Closed

Concrete sampling testing & placement inspection for RC first floor


3716 KHEP-CI-3716
slab & stair Cluster 43 A6
Cluster 43 A6 NA Division 3 17-Feb-2018 18-Feb-2018 11:00 AM 19-Feb-2018 E Rejected Closed

Concrete sampling testing & placement inspection for RC first floor Approved w/
3716.1 KHEP-CI-3716-01
slab & stair Cluster 43 A6
Cluster 43 A6 NA Division 3 19-Feb-2018 20-Feb-2018 9:00 AM 20-Feb-2018 B comments
Closed

Blinding concrete sampling testing & placement inspection for footing Approved w/
3717 KHEP-CI-3717
Public Toilet PTA Type A
Public Toilet Type A-PTA Division 3 17-Feb-2018 18-Feb-2018 10:00 AM 19-Feb-2018 B comments
Closed

Cast in place concrete formwork inspection for RC column ground Cluster 26


3718 KHEP-CI-3718
floor Cluster 26 BC4 BC4
NA Division 3 17-Feb-2018 18-Feb-2018 10:00 AM 19-Feb-2018 A Approved Closed

Cast in place concrete formwork inspection for RC footing Public


3719 KHEP-CI-3719
Toilet PTA
Public Toilet PTA Division 3 17-Feb-2018 18-Feb-2018 10:00 AM 19-Feb-2018 A Approved Closed

Installation of reinforcing steel bar embedded item & form closure


3720 KHEP-CI-3720
inspection for RC footing Public Toilet PTA
Public Toilet PTA Division 3 17-Feb-2018 18-Feb-2018 10:00 AM 19-Feb-2018 A Approved Closed

Check the survey work elevation & coordinate for blinding of grade Cluster 29
3721 KHEP-CI-3721
beam Cluster 29 BC4 BC4
NA Division 3 17-Feb-2018 18-Feb-2018 2:00 PM 19-Feb-2018 A Approved Closed

Inspection of gravel bedding installation under pipe trench with


3722 KHEP-CI-3722 geotextile protection sheet sewer main line Dia 250mm MH-4-L01 Line 01 Zone 1B Division 31 17-Feb-2018 18-Feb-2018 10:00 AM 18-Feb-2018 A Approved Closed
MH-3-L01 Line 1 Zone 1B
Compaction test of sand filling above the pipe trench & laying
3723 KHEP-CI-3723 warning tape storm main line Dia 500mm MH-I25-L09 MH26-L08 Line 09 Zone 2B Division 31 17-Feb-2018 18-Feb-2018 10:30 AM RECALLED
Zone 2B Line 09

Inspection of excavated & compaction formation for storm manholes


3724 KHEP-CI-3724
storm main line MH-29-L07 MH-29a-L07 Line 07 Zone 1B
Line 07 Zone 1B Division 31 17-Feb-2018 18-Feb-2018 11:00 AM 19-Feb-2018 A Approved Closed

Concrete sampling testing & placement inspection for RC column Cluster 59 Approved w/
3725 KHEP-CI-3725
neck Cluster 59 BC6 BC6
NA Division 3 17-Feb-2018 18-Feb-2018 9:30 AM 19-Feb-2018 B comments
Closed

Inspection of excavated & compaction formation for pipe trench Approved w/


3726 KHEP-CI-3726
sewer main line Dia 200mm MH-1-L35 MH-3-L011 Zone 1A Line 35
Line 35 Zone 1A Division 31 18-Feb-2018 19-Feb-2018 11:00 AM 20-Feb-2018 B comments
Closed

Cast in place concrete formwork inspection for RC roof slab Cluster Approved w/
3727 KHEP-CI-3727
04 A6
Cluster 04 A6 NA Division 3 18-Feb-2018 19-Feb-2018 10:00 AM 19-Feb-2018 E comments
Closed

Cast in place concrete formwork inspection for RC roof slab Cluster


3727.1 KHEP-CI-3727-01
04 A6
Cluster 04 A6 NA Division 3 19-Feb-2018 20-Feb-2018 8:00 AM 20-Feb-2018 A Approved Closed

Installation of reinforcing steel bar embedded item & form closure Approved w/
3728 KHEP-CI-3728
inspection for RC roof slab Cluster 04 A6
Cluster 04 A6 NA Division 3 18-Feb-2018 19-Feb-2018 10:00 AM 19-Feb-2018 E comments
Closed

Installation of reinforcing steel bar embedded item & form closure


3728.1 KHEP-CI-3728-01
inspection for RC roof slab Cluster 04 A6
Cluster 04 A6 NA Division 3 19-Feb-2018 20-Feb-2018 8:00 AM 20-Feb-2018 A Approved Closed

Cast in place concrete formwork inspection for RC first floor slab & Cluster 24
3729 KHEP-CI-3729
stair Cluster 24 BC4 BC4
NA Division 3 18-Feb-2018 19-Feb-2018 10:00 AM 20-Feb-2018 A Approved Closed

Installation of reinforcing steel bar embedded item & form closure Cluster 24
3730 KHEP-CI-3730
inspection for RC first floor slab & stair Cluster 24 BC4 BC4
NA Division 3 18-Feb-2018 19-Feb-2018 10:00 AM 20-Feb-2018 A Approved Closed

Cast in place concrete formwork inspection for RC roof slab Cluster Cluster 21
3731 KHEP-CI-3731
21 BC4 BC4
NA Division 3 18-Feb-2018 19-Feb-2018 10:00 AM 20-Feb-2018 A Approved Closed

Installation of reinforcing steel bar embedded item & form closure Cluster 21
3732 KHEP-CI-3732
inspection for RC roof slab Cluster 21 BC4 BC4
NA Division 3 18-Feb-2018 19-Feb-2018 10:00 AM 20-Feb-2018 A Approved Closed

Compaction tedt first layer pre final layer for backfilling under slab on
3733 KHEP-CI-3733
grade axis A-E / 3-6 Cluster 19 B2
Cluster 19 B2 NA Division 3 18-Feb-2018 19-Feb-2018 1:30 PM 19-Feb-2018 A Approved Closed

Compaction tedt first layer pre final layer for backfilling under slab on
3734 KHEP-CI-3734
grade axis A-E / 3-6 Cluster 20 B2
Cluster 20 B2 NA Division 3 18-Feb-2018 19-Feb-2018 1:30 PM 19-Feb-2018 A Approved Closed

Compaction tedt first layer pre final layer for backfilling under slab on
3735 KHEP-CI-3735
grade axis A-E / 3-6 Cluster 16 B2
Cluster 16 B2 NA Division 3 18-Feb-2018 19-Feb-2018 1:30 PM 19-Feb-2018 A Approved Closed

Cast in place concrete formwork inspection for RC roof slab Cluster


3736 KHEP-CI-3736
30 B2
Cluster 30 B2 NA Division 3 18-Feb-2018 19-Feb-2018 1:00 PM 19-Feb-2018 E Rejected Closed

Cast in place concrete formwork inspection for RC roof slab Cluster


3736.1 KHEP-CI-3736-01
30 B2
Cluster 30 B2 NA Division 3 20-Feb-2018 21-Feb-2018 8:00 AM 21-Feb-2018 A Approved Closed

Installation of reinforcing steel bar embedded item & form closure


3737 KHEP-CI-3737
inspection for RC roof slab Cluster 30 B2
Cluster 30 B2 NA Division 3 18-Feb-2018 19-Feb-2018 1:00 PM 19-Feb-2018 E Rejected Closed

Installation of reinforcing steel bar embedded item & form closure


3737.1 KHEP-CI-3737-01
inspection for RC roof slab Cluster 30 B2
Cluster 30 B2 NA Division 3 20-Feb-2018 21-Feb-2018 8:00 AM 21-Feb-2018 A Approved Closed

Cast in place concrete formwork inspection for RC slab on grade


3738 KHEP-CI-3738
Cluster 11 B2
Cluster 11 B2 NA Division 3 18-Feb-2018 19-Feb-2018 11:00 AM 19-Feb-2018 E Rejected Closed

Cast in place concrete formwork inspection for RC slab on grade


3738.1 KHEP-CI-3738-01
Cluster 11 B2
Cluster 11 B2 NA Division 3 20-Feb-2018 21-Feb-2018 8:00 AM 21-Feb-2018 A Approved Closed

Installation of reinforcing steel bar embedded item & form closure


3739 KHEP-CI-3739
inspection for RC slab on grade Cluster 11 B2
Cluster 11 B2 NA Division 3 18-Feb-2018 19-Feb-2018 11:00 AM 19-Feb-2018 E Rejected Closed

Installation of reinforcing steel bar embedded item & form closure


3739.1 KHEP-CI-3739-01
inspection for RC slab on grade Cluster 11 B2
Cluster 11 B2 NA Division 3 20-Feb-2018 21-Feb-2018 8:00 AM 21-Feb-2018 A Approved Closed

Check the survey work elevation & cordinate for blinding of grade Cluster 28
3740 KHEP-CI-3740
beam Cluster 28 BC4 BC4
NA Division 3 18-Feb-2018 19-Feb-2018 2:00 PM 19-Feb-2018 A Approved Closed

Cast in place concrete formwork inspection for RC column first floor Approved w/
3741 KHEP-CI-3741
axis H-N Cluster 43 B2
Cluster 43 B2 NA Division 3 18-Feb-2018 19-Feb-2018 2:00 PM 20-Feb-2018 B comments
Closed

Concrete sampling testing & placement inspection for RC column Cluster 41 Approved w/
3742 KHEP-CI-3742
ground floor Cluster 41 BC4 BC4
NA Division 3 18-Feb-2018 19-Feb-2018 9:00 AM 20-Feb-2018 B comments
Closed

Installation of reinforcing steel bar embedded item & form closure


3743 KHEP-CI-3743 inspection for RC column ground floor coverage grid line H-N / 1-6 Cluster 45 A6 NA Division 03 18-Feb-2018 19-Feb-2018 2:00 PM 19-Feb-2018 A Approved Closed
Cluster 45 A6
Inspection of excavated formation for sewer manholes sewer main
3744 KHEP-CI-3744
line MH-3-L01 Zone 1B Line 1
Line 01 Zone 1B Division 31 18-Feb-2018 19-Feb-2018 9:30 AM 19-Feb-2018 A Approved Closed

Inspection of gravel bedding installation under S sewer manhole


3745 KHEP-CI-3745 base with geotextile protection sheet sewer main line MH-3-L01 Zone Line 01 Zone 1B Division 31 18-Feb-2018 19-Feb-2018 11:30 AM 19-Feb-2018 A Approved Closed
1B Line 01
Concrete sampling testing & placement inspection for RC slab first Cluster 50
3746 KHEP-CI-3746
floor & 2nd flight stairs Cluster 50 BC4 BC4
NA Division 3 19-Feb-2018 20-Feb-2018 9:30 AM 21-Feb-2018 E Rejected Closed

Cast in place concrete form work inspection for RC grade beams Cluster 56
3747 KHEP-CI-3747
Cluster 56 BC4 BC4
NA Division 3 19-Feb-2018 20-Feb-2018 10:30 AM 20-Feb-2018 A Approved Closed
Installation of reinforcing steel bar embedded item & form closure Cluster 56
3748 KHEP-CI-3748
inspection for RC grade beams Cluster 56 BC4 BC4
NA Division 3 19-Feb-2018 20-Feb-2018 10:35 AM 20-Feb-2018 A Approved Closed

Cast in place concrete form work inspection for RC column first floor
3749 KHEP-CI-3749
Cluster 63 B2
Cluster 63 B2 NA Division 3 19-Feb-2018 20-Feb-2018 11:00 AM 20-Feb-2018 A Approved Closed

Check the survey work elevation & coordinate for blinding under Cluster 49
3750 KHEP-CI-3750
grade beam Cluster 49 BC6 BC6
NA Division 1 19-Feb-2018 20-Feb-2018 10:00 AM 20-Feb-2018 A Approved Closed

Concrete sampling testing & placement inspection for RC footing Approved w/


3751 KHEP-CI-3751
Public Toilet PTA Typr A
Public Toilet Type A-PTA Division 3 19-Feb-2018 20-Feb-2018 11:00 AM 20-Feb-2018 B comments
Closed

Concrete sampling testing & placement inspection for RC column Cluster 26 Approved w/
3752 KHEP-CI-3752
ground floor Cluster 26 BC4 BC4
NA Division 3 19-Feb-2018 20-Feb-2018 11:00 AM 20-Feb-2018 B comments
Closed

Compaction test first layer pre final layer for back filling under slab
3753 KHEP-CI-3753
on grade axis A-E / 3-6 Cluster 08 B2
Cluster 08 B2 NA Division 3 19-Feb-2018 20-Feb-2018 10:00 AM 20-Feb-2018 A Approved Closed

Compaction test first layer pre final layer for back filling under slab
3754 KHEP-CI-3754
on grade axis A-E / 3-6 Cluster 17 B2
Cluster 17 B2 NA Division 3 19-Feb-2018 20-Feb-2018 10:00 AM 20-Feb-2018 A Approved Closed

Cast in place concrete form work inspection for RC first floor slab & Cluster 25 Approved w/
3755 KHEP-CI-3755
stair Cluster 25 BC4 BC4
NA Division 3 19-Feb-2018 20-Feb-2018 11:00 AM 24-Feb-2018 B comments
Closed

Installation of reinforcing steel bar embedded item & form closure Cluster 25
3756 KHEP-CI-3756
inspection for RC first floor slab & stair Cluster 25 BC4 BC4
NA Division 3 19-Feb-2018 20-Feb-2018 11:00 AM 24-Feb-2018 A Approved Closed

Cast in place concrete form work inspection for RC roof slab Cluster Cluster 09 Approved w/
3757 KHEP-CI-3757
09 BC4 BC4
NA Division 3 19-Feb-2018 20-Feb-2018 11:00 AM 21-Feb-2018 B comments
Closed

Installation of reinforcing steel bar embedded item & form closure Cluster 09 Approved w/
3758 KHEP-CI-3758
inspection for RC roof slab Cluster 09 BC4 BC4
NA Division 3 19-Feb-2018 20-Feb-2018 11:00 AM 21-Feb-2018 B comments
Closed

Inspection of pre back filling for around manholes sewer main line
3759 KHEP-CI-3759 Zone 1B Line 01,02 MH-6-L02 MH-7-L02 MH-5-L02 MH-2-A-L02 MH- Line 01,02 Zone 1B Division 31 19-Feb-2018 20-Feb-2018 11:00 AM 21-Feb-2018 A Approved Closed
2-L02 MH-1-L02
Compaction test around footing general fill final layer Zone 2B Cluster 39
3760 KHEP-CI-3760
Cluster 39 BC6 BC6
Zone 2B Division 31 19-Feb-2018 20-Feb-2018 11:30 AM 21-Feb-2018 A Approved Closed

Installation in reinforcing dteel bar embedded item & form closure Cluster 40 Approved w/
3761 KHEP-CI-3761
inspection for RC grade beam Cluster 40 BC4 BC4
NA Division 3 19-Feb-2018 20-Feb-2018 1:30 PM 24-Feb-2018 B comments
Closed

Compaction test around footing general fill 3rd layer Zone 2B Cluster
3762 KHEP-CI-3762
31 B2
Cluster 31 B2 Zone 2B Division 31 19-Feb-2018 20-Feb-2018 10:30 AM 20-Feb-2018 A Approved Closed

Compaction test around footing general fill 1st layer Zone 3B Cluster Cluster 47
3763 KHEP-CI-3763
47 BC6 BC6
Zone 3B Division 31 19-Feb-2018 20-Feb-2018 10:30 AM 20-Feb-2018 A Approved Closed

Blinding concrete sampling testing & placement inspection for


3764 KHEP-CI-3764 Line 27,28 Zone 2B Division 31 19-Feb-2018 20-Feb-2018 11:30 AM Open
manhole sewer main line MH-3-L27 MH-1-A-L28 Line 27,28 Zone 2B

Inspection of excavated & compaction formation for sewer manholes


Line Approved w/
3765 KHEP-CI-3765 sewer main line MH-1-A-L13 MH-1-L17 MH-1-L18 MH-1-L19 Line
13,17,18,19
Zone 2B Division 31 19-Feb-2018 20-Feb-2018 11:30 AM 21-Feb-2018 B comments
Closed
13,17,18,19 Zone 2B

Inspection of excavated & compaction formation for sewer manholes


3766 KHEP-CI-3766
sewer main line MH-1-L22 MH-2-L22 MH-1-L21 Line 21,22 Zone 4B
Line 21,22 Zone 4B Division 31 19-Feb-2018 20-Feb-2018 11:30 AM 21-Feb-2018 A Approved Closed

Blinding concrete sampling testing & placement inspection for


3767 KHEP-CI-3767
manhole storm main line MH-I4-L02 Line 02 Zone 1B
Line 02 Zone 1B Division 31 19-Feb-2018 20-Feb-2018 11:00 AM 20-Feb-2018 A Approved Closed

Cast in place concrete form work inspection for RC slab on grade Approved w/
3768 KHEP-CI-3768
Cluster 12 B2
Cluster 12 B2 NA Division 3 19-Feb-2018 20-Feb-2018 1:30 PM 24-Feb-2018 B comments
Closed

Installation in reinforcing steel bar embedded item & form closure Approved w/
3769 KHEP-CI-3769
inspection for RC slab on grade Cluster 12 B2
Cluster 12 B2 NA Division 3 19-Feb-2018 20-Feb-2018 1:30 PM 24-Feb-2018 B comments
Closed

Installation in reinforcing dteel bar embedded item & form closure Cluster 40
3770 KHEP-CI-3770
inspection for RC grade beam Cluster 40 BC4 BC4
NA Division 3 19-Feb-2018 20-Feb-2018 1:30 PM 24-Feb-2018 A Approved Closed

Concrete sampling testing & placement inspection for RC column Approved w/


3771 KHEP-CI-3771
ground floor coverage grid line A-G / A-6 Cluster 45 A6
Cluster 45 A6 NA Division 3 20-Feb-2018 21-Feb-2018 9:30 AM 21-Feb-2018 B comments
Closed

Termite control surface preparation installation & final inspection for Cluster 69
3772 KHEP-CI-3772
grade beams Cluster 69 BC6 BC6
NA Division 3 20-Feb-2018 21-Feb-2018 9:30 AM 21-Feb-2018 A Approved Closed

Cast in place concrete form work inspection for RC stairs first flight Cluster 55
3773 KHEP-CI-3773
Cluster 55 BC4 BC4
NA Division 3 20-Feb-2018 21-Feb-2018 10:30 AM 21-Feb-2018 A Approved Closed

Installation in reinforcing steel bar embedded item & form closure Cluster 55
3774 KHEP-CI-3774
inspection for RC stairs first flight Cluster 55 BC4 BC4
NA Division 3 20-Feb-2018 21-Feb-2018 10:45 AM 21-Feb-2018 A Approved Closed

Cast in place concrete form work inspection for RC column ground


3775 KHEP-CI-3775
floor coverage grid Line H-N / 1-6 Cluster 45 A6
Cluster 45 A6 NA Division 3 20-Feb-2018 21-Feb-2018 11:00 AM 21-Feb-2018 A Approved Closed

Termite control surface preparation installation & final inspection for Cluster 28
3776 KHEP-CI-3776
grade beam Cluster 28 BC4 BC4
NA Division 3 20-Feb-2018 21-Feb-2018 9:00 AM 21-Feb-2018 A Approved Closed

Termite control surface preparation installation & final inspection for Cluster 29
3777 KHEP-CI-3777
grade beam Cluster 29 BC4 BC4
NA Division 3 20-Feb-2018 21-Feb-2018 9:00 AM 21-Feb-2018 A Approved Closed

Blinding concrete sampling testing & placement inspection for grade Cluster 28
3778 KHEP-CI-3778
beam Cluster 28 BC4 BC4
NA Division 3 20-Feb-2018 21-Feb-2018 10:00 AM 21-Feb-2018 A Approved Closed
Blinding concrete sampling testing & placement inspection for grade Cluster 29
3779 KHEP-CI-3779
beam Cluster 29 BC4 BC4
NA Division 3 20-Feb-2018 21-Feb-2018 10:00 AM 21-Feb-2018 A Approved Closed

Concrete sampling testing & placement inspection for RC column Cluster 36 Approved w/
3780 KHEP-CI-3780
ground floor Cluster 36 BC4 BC4
NA Division 3 20-Feb-2018 21-Feb-2018 11:00 AM 21-Feb-2018 B comments
Closed

Compaction test between Cluster general fill formation level Zone 2A


3781 KHEP-CI-3781
Cluster 40,39
Cluster 40,39 Zone 2A Division 31 20-Feb-2018 21-Feb-2018 11:00 AM 25-Feb-2018 A Approved Closed

3782 KHEP-CI-3782 Compaction test final layer under slan on grade Cluster 20 B2 Cluster 20 B2 NA Division 3 20-Feb-2018 21-Feb-2018 10:00 AM 21-Feb-2018 A Approved Closed

Inspection of pre back filling for around manhole storm main line
3783 KHEP-CI-3783
MH-54-L15 Zone 1B Line 15
Line 15 Zone 1B Division 31 20-Feb-2018 21-Feb-2018 11:00 AM 24-Feb-2018 A Approved Closed

Inspection of laying warining tape installation sewer main line Dia


3784 KHEP-CI-3784 200mm MH-3-L02 MH-2-L02 MH-2-L02 MH-2-A-L02 MH-2-A-L02 Line 02 Zone 1B Division 31 20-Feb-2018 21-Feb-2018 9:00 AM 21-Feb-2018 A Approved Closed
MH1-L02 MH-1-L02 MH-4-L01 Zone 1B Line 02
First coat bituminous damp proofing installation inspection for storm
manholes precast yard MH-I13-L04 MH-I104-L28 MH-I103-L29
3785 KHEP-CI-3785
MHI102-L28 MH-I112-L32 MH-I99-L27 MH-I72-L20 Zone 1B,4B Line
Line 04,29,32 Zone 1B,4B Division 31 20-Feb-2018 21-Feb-2018 10:30 AM 21-Feb-2018 A Approved Closed
04,29,32
Inspection of gravel filling up to the pipe around manhole sewer
3786 KHEP-CI-3786 main line Zone 1B Line 02 MH-1-L02 MH-2-L02 MH-2-A-L02 MH-3- Line 02 Zone 1B Division 31 20-Feb-2018 21-Feb-2018 11:00 AM 21-Feb-2018 A Approved Closed
L02

3787 KHEP-CI-3787 Compaction test final layer under slab on grade Cluster 19 B2 Cluster 19 B2 NA Division 3 20-Feb-2018 21-Feb-2018 10:00 AM 21-Feb-2018 A Approved Closed

Concrete sampling testing & placement inspection for RC first floor Cluster 24 Approved w/
3788 KHEP-CI-3788
slab & stair Cluster 24 BC4 BC4
NA Division 3 21-Feb-2018 22-Feb-2018 11:00 AM 24-Feb-2018 B comments
Closed

Concrete sampling testing & placement inspection for RC first floor Cluster 22 Approved w/
3789 KHEP-CI-3789
slab & stair Cluster 22 BC4 BC4
NA Division 3 21-Feb-2018 22-Feb-2018 11:00 AM 24-Feb-2018 B comments
Closed

Installation in reinforcing steel bar embedded item & form closure Cluster 22
3790 KHEP-CI-3790
inspection for RC column first floor Cluster 22 BC4 BC4
NA Division 3 21-Feb-2018 22-Feb-2018 2:00 PM 24-Feb-2018 A Approved Closed

Installation in reinforcing steel bar embedded item & form closure Cluster 24
3791 KHEP-CI-3791
inspection for RC column first floor Cluster 24 BC4 BC4
NA Division 3 21-Feb-2018 22-Feb-2018 2:00 PM 24-Feb-2018 A Approved Closed

Installation in reinforcing steel bar embedded item & form closure


3792 KHEP-CI-3792
inspection for RC column neck Public Toilet PTA Type A
Public Toilet Type A-PTA Division 3 21-Feb-2018 22-Feb-2018 10:00 AM 24-Feb-2018 A Approved Closed

Cast in place concrete formwork inspection for RC roof slab Cluster


3793 KHEP-CI-3793
34 B2
Cluster 34 B2 NA Division 3 21-Feb-2018 22-Feb-2018 10:00 AM 24-Feb-2018 A Approved Closed

Installation in reinforcing steel bar embedded item & form closure Cluster 34
3794 KHEP-CI-3794
inspection for RC roof floor Cluster 34 BC4 BC4
NA Division 3 21-Feb-2018 22-Feb-2018 10:00 AM 24-Feb-2018 A Approved Closed

Cast in place concrete formwork inspection for RC column first floor


3795 KHEP-CI-3795
axis A-G Cluster 43 A6
Cluster 43 A6 NA Division 3 21-Feb-2018 22-Feb-2018 2:00 PM 24-Feb-2018 A Approved Closed

Installation in reinforcing steel bar embedded item & form closure Cluster 50
3796 KHEP-CI-3796
inspection for RC column first floor Cluster 50 BC4 BC4
NA Division 3 21-Feb-2018 22-Feb-2018 9:00 AM 24-Feb-2018 A Approved Closed

Cast in place concrete form work inspection for RC slab first floor & Approved w/
3797 KHEP-CI-3797
second flight stair Cluster 64 B2
Cluster 64 B2 NA Division 3 21-Feb-2018 22-Feb-2018 10:30 AM 24-Feb-2018 B comments
Closed

Installation in reinforcing steel bar embedded item & form closure


3798 KHEP-CI-3798
inspection for RC slab first floor & second flight stair Cluster 64 B2
Cluster 64 B2 NA Division 3 21-Feb-2018 22-Feb-2018 10:35 AM 24-Feb-2018 A Approved Closed

Compaction test final layer under slab on grade axis A-J / 3-6 Cluster Cluster 16 Approved w/
3799 KHEP-CI-3799
16 BC4 BC4
NA Division 3 21-Feb-2018 22-Feb-2018 10:00 AM 24-Feb-2018 B comments
Closed

Inspection of pre back filling around manhole sewer main line MH-5-
3800 KHEP-CI-3800
L01 MH-4-L01 Line 01 Zone 1B
Line 01 Zone 1B Division 31 21-Feb-2018 22-Feb-2018 11:00 AM 24-Feb-2018 E Rejected Closed

Compaction test around footing general fill final layer Zone 3B Cluster 47
3801 KHEP-CI-3801
Cluster 47 BC6 BC6
Zone 3B Division 31 21-Feb-2018 22-Feb-2018 10:30 AM 25-Feb-2018 A Approved Closed

Compaction test around footing general fill final layer Zone 2B


3802 KHEP-CI-3802
Cluster 31 B2
Cluster 31 B2 Zone 2B Division 31 21-Feb-2018 22-Feb-2018 10:30 AM 25-Feb-2018 A Approved Closed

Blinding concrete sampling testing & placement inspection for


3803 KHEP-CI-3803 manhole sewer main line MH-1-L30 MH-2-L30 MH-3-L30 Line 30 Line 30 Zone 2B Division 31 21-Feb-2018 22-Feb-2018 11:30 AM 24-Feb-2018 A Approved Closed
Zone 2B

Blinding concrete sampling testing & placement inspection for


3804 KHEP-CI-3804
manhole storm main line MH-29-L07 MH-29a-L07 Line 07 Zone 1B
Line 07 Zone 1B Division 31 21-Feb-2018 22-Feb-2018 11:00 AM 24-Feb-2018 A Approved Closed

Concrete Sampling, Testing and Placement inspection for RC Roof


3805 KHEP-CI-3805
Slab
Cluster 4 A6 NA Division 03 22-Feb-2018 24-Feb-2018 11:00 AM 25-Feb-2018 A Approved Closed

Concrete sampling , Testing and Placement Inspection for RC Roof Cluster 21 BC


3806 KHEP-CI-3806
Slab 4
NA Division 03 22-Feb-2018 24-Feb-2018 11:00 AM 25-Feb-2018 A Approved Closed

Concrete sampling , Testing and Placement Inspection for RC Slab on Cluster 11 BC


3807 KHEP-CI-3807
Grade 4
NA Division 03 22-Feb-2018 24-Feb-2018 11:00 AM 25-Feb-2018 A Approved Closed
Cluster 57 BC
3808 KHEP-CI-3808 Cast in place concrete form work inspection for RC Column
4
NA Division 03 22-Feb-2018 24-Feb-2018 10:00 AM 25-Feb-2018 A Approved Closed

Concrete samling testing & placement inspection for RC Column


3809 KHEP-CI-3809
Ground Floor
Cluster 45 A6 NA Division 03 22-Feb-2018 24-Feb-2018 9:30 AM 25-Feb-2018 A Approved Closed

Blinding concrete sampling testing & placement inspection for RC Cluster 49


3810 KHEP-CI-3810
Grade Beam BC6
NA Division 03 22-Feb-2018 24-Feb-2018 9:30 AM 25-Feb-2018 A Approved Closed

Concrete sampling testing & placement inspection for RC Grade Cluster 56


3811 KHEP-CI-3811
Beams BC4
NA Division 03 22-Feb-2018 24-Feb-2018 9:30 AM 25-Feb-2018 A Approved Closed

Concrete sampling testing & placement inspection RC Stairs First Cluster 55


3812 KHEP-CI-3812
Flight BC4
NA Division 03 22-Feb-2018 24-Feb-2018 9:30 AM 25-Feb-2018 A Approved Closed

Cluster 18 BC
3813 KHEP-CI-3813 Cast in Place concrete formwork inspection for RC roof slab
4
NA Division 03 22-Feb-2018 24-Feb-2018 10:00 AM 25-Feb-2018 A Approved Closed

Installation of reinforcing steel bar embedded item and form closure Cluster 18 BC
3814 KHEP-CI-3814
inspection for RC roof slab 4
NA Division 03 22-Feb-2018 24-Feb-2018 10:00 AM 25-Feb-2018 A Approved Closed

70cm CMU Morter & Masonry Inspection Under Exterior Reinforced Cluster 62 BC
3815 KHEP-CI-3815
Grade Beam 6
NA Division 03 22-Feb-2018 24-Feb-2018 10:30 AM 25-Feb-2018 A Approved Closed

3816 KHEP-CI-3816 Compaction test final layer under slab on grade axis (A-E/ 3-6) Cluster 17 B2 NA Division 03 22-Feb-2018 24-Feb-2018 10:00 AM 25-Feb-2018 A Approved Closed

Cluster 22 BC
3817 KHEP-CI-3817 Cast in place concrete formwork inspection for RC Column first floor
4
NA Division 03 22-Feb-2018 24-Feb-2018 2:00 PM 25-Feb-2018 A Approved Closed

Inspection of laying warning tape Installation Sewer main line Dia


3818 KHEP-CI-3818
200mm
Line 02 Zone 1B Division 31 22-Feb-2018 24-Feb-2018 9:00 AM 25-Feb-2018 A Approved Closed

Inspection of gravel filling above the pipe trench with geotextile


3819 KHEP-CI-3819
protection sheet Sewer main line Dia 200mm
Line 01 Zone 1B Division 31 22-Feb-2018 24-Feb-2018 10:00 AM 25-Feb-2018 A Approved Closed

Inspection formwork and concrete pouring for sewer Back Drop From
3820 KHEP-CI-3820
IC to MH 160mm at Man Hole (First stage)
Line 02 Zone 2B Division 31 22-Feb-2018 24-Feb-2018 2:30 PM 25-Feb-2018 A Approved Closed

Inspection of gravel filling up to the pipe Around Manhole Sewer


3821 KHEP-CI-3821
main line
Line 01 Zone 1B Division 31 22-Feb-2018 24-Feb-2018 11:00 PM 25-Feb-2018 A Approved Closed

Cast in place concrete formwork inspection for RC Slabs & Rc Beams


3822 KHEP-CI-3822
- Roof Floor Cluster 72 B2
Cluster 72 B2 NA Division 03 24-Feb-2018 25-Feb-2018 10:30 AM 26-Feb-2018 E Rejected Closed

Cast in place concrete formwork inspection for RC Slabs & Rc Beams


3822.1 KHEP-CI-3822-01
- Roof Floor Cluster 72 B2
Cluster 72 B2 NA Division 03 26-Feb-2018 27-Feb-2018 10:30 AM 27-Feb-2018 A Approved Closed

Installation of reinforcing steel bar embedded item and form closure


3823 KHEP-CI-3823
inspection for RC slab & Rc Beams - Roof Floor Cluster 72 B2
Cluster 72 B2 NA Division 03 24-Feb-2018 25-Feb-2018 10:35 AM 26-Feb-2018 E Rejected Closed

Installation of reinforcing steel bar embedded item and form closure


3823.1 KHEP-CI-3823-01
inspection for RC slab & Rc Beams - Roof Floor Cluster 72 B2
Cluster 72 B2 NA Division 03 26-Feb-2018 27-Feb-2018 10:30 AM 27-Feb-2018 A Approved Closed

Concrete samling testing & placement inspection for RC Column First


3824 KHEP-CI-3824
Floor Cluster 63 B2
Cluster 63 B2 NA Division 03 24-Feb-2018 25-Feb-2018 9:30 AM 25-Feb-2018 A Approved Closed

Concrete samling testing & placement inspection for RC Stairs First Cluster 55 Approved w/
3825 KHEP-CI-3825
Flight Cluster 55 BC4 BC4
NA Division 03 24-Feb-2018 25-Feb-2018 9:30 AM 25-Feb-2018 B comments
Closed

Cast in place concrete formwork inspection for RC column First Floor Cluster 50
3826 KHEP-CI-3826
Cluster 50 BC4 BC4
NA Division 03 24-Feb-2018 25-Feb-2018 11:00 PM 25-Feb-2018 A Approved Closed

Concrete samling testing & placement inspection for RC Roof Slab Approved w/
3827 KHEP-CI-3827
Cluster 9 BC4
Cluster 9 BC4 NA Division 03 24-Feb-2018 25-Feb-2018 11:00 PM 25-Feb-2018 B comments
Closed

Concrete samling testing & placement inspection for RC First Floor Cluster 25 Approved w/
3828 KHEP-CI-3828
Slab & Stair Cluster 25 BC4 BC4
NA Division 03 24-Feb-2018 25-Feb-2018 11:00 PM 26-Feb-2018 B comments
Closed

Concrete samling testing & placement inspection for RC Roof Slab Approved w/
3829 KHEP-CI-3829
Cluster 30 B2
Cluster 30 B2 NA Division 03 24-Feb-2018 25-Feb-2018 11:00 PM 26-Feb-2018 B comments
Closed

Installation of reinforcing steel bar embedded item and form closure Cluster 25
3830 KHEP-CI-3830
inspection for RC Column (First Floor) Cluster 25 BC4 BC4
NA Division 03 24-Feb-2018 25-Feb-2018 10:00 PM 26-Feb-2018 A Approved Closed

Compaction test first Layer - pre Final layer for Backfilling under
3831 KHEP-CI-3831
slabon grade axis (B-D)/(1-3) Cluster 17 B2
Cluster 17 B2 NA Division 03 24-Feb-2018 25-Feb-2018 10:00 PM 26-Feb-2018 A Approved Closed

Compaction test first Layer - pre Final layer for Backfilling under
3832 KHEP-CI-3832
slabon grade axis (A-E)/(3-6) Cluster 17 B2
Cluster 27 B2 NA Division 03 24-Feb-2018 25-Feb-2018 10:00 PM 26-Feb-2018 A Approved Closed

Compaction test final layer under slab on grade axis (A-E/ 3-6)
3833 KHEP-CI-3833
Cluster 8 B2
Cluster 8 B2 NA Division 03 24-Feb-2018 25-Feb-2018 10:00 PM 26-Feb-2018 A Approved Closed

Cast in place concrete inspection for RC column Neck Public Toilet - Toilet - PTA-
3834 KHEP-CI-3834
PTA- Type A Type A
NA Division 03 24-Feb-2018 25-Feb-2018 10:00 PM 25-Feb-2018 A Approved Closed

Cast in place concrete formwork inspection for RC Grade Beams Cluster 29


3835 KHEP-CI-3835
Cluster 29 BC4 BC4
NA Division 03 24-Feb-2018 25-Feb-2018 10:00 PM 25-Feb-2018 A Approved Closed

Installation of reinforcing steel bar embedded item and form closure Cluster 29
3836 KHEP-CI-3836
inspection for RC Grade Beam Cluster 29 BC4 BC4
NA Division 03 24-Feb-2018 25-Feb-2018 10:00 PM 25-Feb-2018 A Approved Closed

Check the Survey work Elevation and Coordinate for blinding of


3837 KHEP-CI-3837
Grade beam Cluster 31 B2
Cluster 31 B2 NA Division 03 24-Feb-2018 25-Feb-2018 2:00 PM 27-Feb-2018 A Approved Closed
Concrete sampling testing & placement inspection for RC column first Cluster 22
3838 KHEP-CI-3838
floor Cluster 22 BC4 BC4
NA Division 03 25-Feb-2018 26-Feb-2018 11:00 AM 27-Feb-2018 E Rejected Closed

Concrete sampling testing & placement inspection for RC slab on


3839 KHEP-CI-3839
grade Cluster 12 B2
Cluster 12 B2 NA Division 03 25-Feb-2018 26-Feb-2018 11:00 AM 27-Feb-2018 E Rejected Closed

Termite control surface preparation installation & final inspection for Approved w/
3840 KHEP-CI-3840
slab on grade axis A-E/3-6 Cluster 19 B2
Cluster 19 B2 NA Division 03 25-Feb-2018 26-Feb-2018 9:00 AM 27-Feb-2018 B comments
Closed

Termite control surface preparation installation & final inspection for Approved w/
3841 KHEP-CI-3841
slab on grade axis A-E/3-6 Cluster 20 B2
Cluster 20 B2 NA Division 03 25-Feb-2018 26-Feb-2018 9:00 AM 27-Feb-2018 B comments
Closed

Termite control surface preparation installation & final inspection for Cluster 16 Approved w/
3842 KHEP-CI-3842
slab on grade axis A-J/3-6 Cluster 16 BC4 BC4
NA Division 03 25-Feb-2018 26-Feb-2018 9:00 AM 27-Feb-2018 B comments
Closed

Compaction test first layer pre final layer for backfilling under slab on
3843 KHEP-CI-3843
grade axis B-D/1-3 Cluster 19 B2
Cluster 19 B2 NA Division 03 25-Feb-2018 26-Feb-2018 10:00 AM 27-Feb-2018 A Approved Closed

Compaction test first layer pre final layer for backfilling under slab on
3844 KHEP-CI-3844
grade axis B-D/1-3 Cluster 20 B2
Cluster 20 B2 NA Division 03 25-Feb-2018 26-Feb-2018 10:00 AM 27-Feb-2018 A Approved Closed

Compaction test first layer pre final layer for backfilling under slab on
3845 KHEP-CI-3845
grade axis B-D/1-3 Cluster 08 B2
Cluster 08 B2 NA Division 03 25-Feb-2018 26-Feb-2018 10:00 AM 27-Feb-2018 A Approved Closed

Concrete sampling testing & placement inspection for RC slab first Approved w/
3846 KHEP-CI-3846
floor & second flight stair Cluster 64 B2
Cluster 64 B2 NA Division 03 25-Feb-2018 26-Feb-2018 9:30 AM 27-Feb-2018 B comments
Closed

Inspection of laying warning tape installation sewer main line Dia


3847 KHEP-CI-3847
200mm Mh-5-L01 MH-4-L01 Zone 1B Line 01
Line 01 Zone 1B Division 31 25-Feb-2018 26-Feb-2018 9:00 AM 27-Feb-2018 A Approved Closed

Compaction test between Cluster general fill first layer Zone 2B


3848 KHEP-CI-3848
Cluster 40, 39
Cluster 40,39 Zone 2B Division 31 25-Feb-2018 26-Feb-2018 11:00 AM 27-Feb-2018 A Approved Closed

Compaction test excavated Formation Level bottom of Foundation Public Toilet


3849 KHEP-CI-3849
Zone 5B, Public Toilet B1 B1
Zone 5B Division 31 25-Feb-2018 26-Feb-2018 11:00 AM 27-Feb-2018 A Approved Closed

Inspection of excavated & compaction formation for pipe trench


Approved w/
3850 KHEP-CI-3850 Portable & Fire Fighting Dia160, 200mm ISO-09-P91 ISO-41-P89 Sta P 91,89 Zone 1B Division 31 25-Feb-2018 26-Feb-2018 11:30 AM 27-Feb-2018 B comments
Closed
0+004 0+162 Along Road 01 Zone 1B P 91,89

Inspection of reinforcement steel bar & internal shutter from storm


Catch Basin precast yard CB-189 CB-190 MH-89-L22 CB-197 CB-198
MH-91A-L22 CB-199 MH-88-L22 CB-179 MH-79-L21 CB-180 CB-81 Line
Approved w/
3851 KHEP-CI-3851 CB-82 MH-108-L27 CB-195 CB-196 MH-91-L22 CB-183 CB-184 MH- 21,27,22,30- Zone 2B Division 33 25-Feb-2018 26-Feb-2018 11:30 AM 27-Feb-2018 B comments
Closed
107a-L30 CB-185 CB-186 MH-107-L30 CB-191 CB-192 CB-193 MH- 20Pic
78-L21 CB-187 CB-188 MH-106-L30 Zone 2B Line 21,27,22,30-
20Pic
Cast in place concrete dormwork inspection for RC roof slab Cluster
3852 KHEP-CI-3852
44 A6
Cluster 44 A6 NA Division 3 25-Feb-2018 26-Feb-2018 9:00 AM 27-Feb-2018 A Approved Closed

Installation of reinforcing steel bar embedded item & form closure


3853 KHEP-CI-3853
inspection for RC roof slab Cluster 44 A6
Cluster 44 A6 NA Division 3 25-Feb-2018 26-Feb-2018 9:00 AM 27-Feb-2018 A Approved Closed

Cast in place concrete dormwork inspection for RC first floor slab & Cluster 42
3854 KHEP-CI-3854
stair Cluster 42 BC4 BC4
NA Division 3 25-Feb-2018 26-Feb-2018 9:00 AM 27-Feb-2018 A Approved Closed

Installation of reinforcing steel bar embedded item & form closure Cluster 42
3855 KHEP-CI-3855
inspection for RC first floor slab & stair Cluster 42 BC4 BC4
NA Division 3 25-Feb-2018 26-Feb-2018 9:00 AM 27-Feb-2018 A Approved Closed

Installation of reinforcing steel bar embedded item & form closure Cluster 56
3856 KHEP-CI-3856
inspection for RC column ground floor Cluster 56 BC4 BC4
NA Division 3 26-Feb-2018 27-Feb-2018 11:00 AM 27-Feb-2018 A Approved Closed

Installation of reinforcing steel bar embedded item & form closure


3857 KHEP-CI-3857
inspection for RC column first floor Cluster 64 B2
Cluster 64 B2 NA Division 3 26-Feb-2018 27-Feb-2018 2:00 PM 27-Feb-2018 A Approved Closed

Cast in place concrete formwork inspection for RC grade beams


3858 KHEP-CI-3858 Cluster 67 A4 NA Division 3 26-Feb-2018 27-Feb-2018 1:30 PM Open
Cluster 67 A4
Installation of reinforcing steel bar embedded item & form closure
3859 KHEP-CI-3859 Cluster 67 A4 NA Division 3 26-Feb-2018 27-Feb-2018 2:00 PM Open
inspection for RC grade beams Cluster 67 A4
Cast in place concrete formwork inspection for RC Roof slab Cluster
3860 KHEP-CI-3860
35 A6
Cluster 35 A6 NA Division 3 26-Feb-2018 27-Feb-2018 10:00 AM 27-Feb-2018 A Approved Closed

Installation of reinforcing steel bar embedded item & form closure


3861 KHEP-CI-3861
inspection for RC Roof slab Cluster 35 B2
Cluster 35 B2 NA Division 3 26-Feb-2018 27-Feb-2018 10:00 AM 27-Feb-2018 A Approved Closed

Cast in place concrete formwork inspection for RC Roof slab Cluster Cluster 23
3862 KHEP-CI-3862
23 BC4 BC4
NA Division 3 26-Feb-2018 27-Feb-2018 1:30 PM 28-Feb-2018 A Approved Closed

Installation of reinforcing steel bar embedded item & form closure Cluster 23
3863 KHEP-CI-3863
inspection for RC Roof slab Cluster 23 BC4 BC4
NA Division 3 26-Feb-2018 27-Feb-2018 1:30 PM 28-Feb-2018 A Approved Closed

Cast in place concrete formwork inspection for RC grade beam Cluster 28


3864 KHEP-CI-3864
Cluster 28 BC4 BC4
NA Division 3 26-Feb-2018 27-Feb-2018 2:00 PM 27-Feb-2018 A Approved Closed

Installation of reinforcing steel bar embedded item & form closure Cluster 28
3865 KHEP-CI-3865
inspection for RC grade beam Cluster 28 BC4 BC4
NA Division 3 26-Feb-2018 27-Feb-2018 2:00 PM 27-Feb-2018 A Approved Closed

Concrete sampling testing & placement inspection for RC roof slab Cluster 18
3866 KHEP-CI-3866
Cluster 18 BC4 BC4
NA Division 3 26-Feb-2018 27-Feb-2018 11:00 AM 27-Feb-2018 A Approved Closed

Concrete sampling testing & placement inspection for RC grade beam Cluster 29
3867 KHEP-CI-3867
Cluster 29 BC4 BC4
NA Division 3 26-Feb-2018 27-Feb-2018 11:00 AM 27-Feb-2018 A Approved Closed
Concrete sampling testing & placement inspection for RC column first
3868 KHEP-CI-3868
floor Cluster 43 A6
Cluster 43 A6 NA Division 3 26-Feb-2018 27-Feb-2018 11:00 AM 27-Feb-2018 E Rejected Closed

Concrete sampling testing & placement inspection for RC grade beam Cluster 40 Approved w/
3869 KHEP-CI-3869
Cluster 40 BC4 BC4
NA Division 3 26-Feb-2018 27-Feb-2018 11:00 AM 27-Feb-2018 B comments
Closed

Concrete sampling testing & placement inspection for RC column Approved w/


3870 KHEP-CI-3870
neck Public Toilet PTA Type A
Public Toilet Type A-PTA Division 3 26-Feb-2018 27-Feb-2018 11:00 AM 27-Feb-2018 B comments
Closed

Installation of reinforcing steel bar embedded item & form closure Cluster 29
3871 KHEP-CI-3871
inspection for RC column ground floor Cluster 29 BC4 BC4
NA Division 3 26-Feb-2018 27-Feb-2018 10:00 AM 27-Feb-2018 A Approved Closed

Inspection of pre back filling around manhole sewer main line MH-6-
3872 KHEP-CI-3872 Line 01 Zone 1B Division 31 26-Feb-2018 27-Feb-2018 11:00 AM Open
L01 MH-10-L01 MH-11-L01 MH-12-L01 Zone 1B Line 01
Inspection of excavated & compaction formation for sewer manholes
3873 KHEP-CI-3873
sewer main line MH-1-A-L22 Zone 4B Line 22
Line 22 Zone 4B Division 31 26-Feb-2018 27-Feb-2018 11:30 AM 28-Feb-2018 A Approved Closed

Blinding concrete sampling testing & placement inspection for


3874 KHEP-CI-3874 manholes sewer main line MH-4-L22 MH-2-L22 MH-1-L21 Zone 4B Line 21,22 Zone 4B Division 31 26-Feb-2018 27-Feb-2018 11:30 AM 28-Feb-2018 A Approved Closed
Line 21,22
Damproofing surface preparation for RC grade beam from inside
3875 KHEP-CI-3875
Cluster 35 B2
Cluster 35 B2 NA Division 7 26-Feb-2018 27-Feb-2018 10:00 AM 27-Feb-2018 A Approved Closed

Compaction test first layer pre final layer for back filling under slab Cluster 09 Approved w/
3876 KHEP-CI-3876
on grade axis A-J 3-6 Cluster 09 BC4 BC4
NA Division 3 26-Feb-2018 27-Feb-2018 10:00 AM 28-Feb-2018 B comments
Closed

Concrete sampling testing & placement inspection for RC column first Cluster 50
3877 KHEP-CI-3877 NA Division 3 27-Feb-2018 28-Feb-2018 9:30 AM Open
floor Cluster 50 BC4 BC4
Cast in place concrete formwork inspection for RC slab & RC beams
3878 KHEP-CI-3878 Cluster 58 B2 NA Division 3 27-Feb-2018 28-Feb-2018 1:30 PM Open
roof floor Cluster 58 B2

Installation of reinforcing steel bar embedded item & form closure


3879 KHEP-CI-3879 Cluster 58 B2 NA Division 3 27-Feb-2018 28-Feb-2018 2:00 PM Open
inspection for RC slab & RC beams roof floor Cluster 58 B2

Concrete sampling testing & placement inspection for RC roof slab


3880 KHEP-CI-3880 Cluster 34 B2 NA Division 3 27-Feb-2018 28-Feb-2018 11:00 AM Open
Cluster 34 B2
Concrete sampling testing & placement inspection for RC roof slab
3881 KHEP-CI-3881 Cluster 44 A6 NA Division 3 27-Feb-2018 28-Feb-2018 11:00 AM Open
Cluster 44 A6
Compaction test final layer under slan on grade axis B-D / 1-3
3882 KHEP-CI-3882 Cluster 08 B2 NA Division 3 27-Feb-2018 28-Feb-2018 10:00 AM Open
Cluster 08 B2
Compaction test final layer under slan on grade axis B-D / 1-3
3883 KHEP-CI-3883 Cluster 19 B2 NA Division 3 27-Feb-2018 28-Feb-2018 10:00 AM Open
Cluster 19 B2
Compaction test final layer under slan on grade axis B-D / 1-3
3884 KHEP-CI-3884 Cluster 17 B2 NA Division 3 27-Feb-2018 28-Feb-2018 10:00 AM Open
Cluster 17 B2
Compaction test final layer under slan on grade axis B-D / 1-3
3885 KHEP-CI-3885 Cluster 20 B2 NA Division 3 27-Feb-2018 28-Feb-2018 10:00 AM Open
Cluster 20 B2
Cast in place concrete formwork inspection for RC concrete coping at
3886 KHEP-CI-3886 Cluster 01 A6 NA Division 3 27-Feb-2018 28-Feb-2018 10:00 AM Open
roof slab Cluster 01 A6

Installation of reinforcing steel bar embedded item & form closure


3887 KHEP-CI-3887 Cluster 01 A6 NA Division 3 27-Feb-2018 28-Feb-2018 10:00 AM Open
inspection for RC concrete coping at roof slab Cluster 01 A6

Inspection of sand filling up to the pipe & laying warning tape around
3888 KHEP-CI-3888 Line 01 Zone 1B Division 31 27-Feb-2018 28-Feb-2018 11:00 AM Open
manhole sewer main line MH-7-L01 Zone 1B Line 01
Inspection of pre back filling around manhole sewer mian line MH-
3889 KHEP-CI-3889 Line 01 Zone 1B Division 31 27-Feb-2018 28-Feb-2018 11:00 AM Open
13-L01 MH-14-L01 Zone 1B Line 01

Inspection Formwork for base & wall and concrete pouring for Storm
Catch Basin Precast yard Zone 2B Line 21,27,22,30 20Pic CB-189
&CB-190 At MH-89-L22 And CB-197 & CB-198 At MH-91A-L22
AndCB-199 At MH-88-L22 CB-179 At MH-79-L21 AndCB-180&CB- Line
3890 KHEP-CI-3890 Zone 2B Division 33 27-Feb-2018 28-Feb-2018 9:00 AM Open
81&CB-82 At MH-108-L27AndCB-195 & CB-196 At MH-91-L22 CB- 21,27,22,30
183 & CB-184 at MH-107a-L30 & CB-185 & CB-186 at MH-107-L30
CB-191 & CB-192 & CB-193 At MH-90-L21 & CB-187&CB-188 at MH-
106-L30

Compaction test of sand filling up to the pipe 1st layer around


3891 KHEP-CI-3891 Line 31 Zone 1B Division 31 27-Feb-2018 28-Feb-2018 10:00 AM Open
manhole sewer main line MH-1-A-L31 Zone 1B Line 31
Compaction test of sand filling up to the pipe 1st layer around
3892 KHEP-CI-3892 Line 15 Zone 1B Division 31 27-Feb-2018 28-Feb-2018 10:00 AM Open
manhole sewer main line MH-54-L15 Zone 1B Line 15
Inspection formwork & concrete pouring for sewer embedded pice at
manhole MH-3-L09 MH-1-L10 MH-1-L11 one side MH-1-L09 three
3893 KHEP-CI-3893 Line 09,10,11 Zone 1B Division 31 27-Feb-2018 28-Feb-2018 9:30 AM Open
side MH-2-L09 MH-1-A-L10 MH-1-A-L11 two side Zone 1B Line
09,10,11

Installation for sewer GRP manholes sewer main line MH-3-L27 MH-
3894 KHEP-CI-3894 Line 30,29,27 Zone 2B Division 31 27-Feb-2018 28-Feb-2018 10:30 AM Open
1-L30 MH-2-L30 MH-3-L30 MH-1-A-L29 Zone 2B Line 30,29,27
Installation inspection of precast storm drainage manholes MH-I4-
3895 KHEP-CI-3895 Line 02,07 Zone 2B Division 31 27-Feb-2018 28-Feb-2018 11:00 AM Open
L02 MH-I5-L02 MH-29-L07 MH-29a-L07 Zone 2B Line 02,07

Cast in place concrete formwork inspection for RC column first floor Cluster 24
3896 KHEP-CI-3896 NA Division 3 27-Feb-2018 28-Feb-2018 10:00 AM Open
Cluster 24 BC4 BC4
Installation of reinforcing steel bar embedded item & form closure Cluster 40
3897 KHEP-CI-3897 NA Division 3 27-Feb-2018 28-Feb-2018 10:00 AM Open
inspection for column ground floor Cluster 40 BC4 BC4
Concrete sampling testing & placement inspection for RC first floor Cluster 42
3898 KHEP-CI-3898 NA Division 3 28-Feb-2018 1-Mar-2018 11:00 AM Open
slab & stair Cluster 42 BC4 BC4
Installation of reinforcing steel bar embedded item & form closure Cluster 42
3899 KHEP-CI-3899 NA Division 3 28-Feb-2018 1-Mar-2018 11:00 AM Open
inspection for column first floor Cluster 42 BC4 BC4
Cast in place concrete formwork inspection for RC column ground Cluster 29
3900 KHEP-CI-3900 NA Division 3 28-Feb-2018 1-Mar-2018 1:30 PM Open
floor Cluster 29 BC4 BC4
Compaction test first layer pre final layer for backfilling under slab on Cluster 09
3901 KHEP-CI-3901 NA Division 3 28-Feb-2018 1-Mar-2018 11:00 AM Open
grade axis B-D / 1-3 & F-H / 1-3 Cluster 09 BC4 BC4
Compaction test first layer pre final layer for backfilling under slab on Cluster 16
3902 KHEP-CI-3902 NA Division 3 28-Feb-2018 1-Mar-2018 11:00 AM Open
grade axis B-D / 1-3 & F-H / 1-3 Cluster 16 BC4 BC4
Check the survey work elevation & coordination for building of grade Cluster 47
3903 KHEP-CI-3903 NA Division 3 28-Feb-2018 1-Mar-2018 9:30 AM Open
beams Cluster 47 BC6 BC6
Cast in place concrete formwork inspection for RC Slabs & Rc Beams Cluster 60
3904 KHEP-CI-3904 NA Division 3 28-Feb-2018 1-Mar-2018 10:30 AM Open
- Roof Floor Cluster 60 BC4 BC4

Installation of reinforcing steel bar embedded item & form closure Cluster 60
3905 KHEP-CI-3905 NA Division 3 28-Feb-2018 1-Mar-2018 10:40 AM Open
inspection for RC Slabs & Rc Beams - Roof Floor Cluster 60 BC4 BC4

Compaction test 1st & final layer structural fill selected fill bottom of Public Toilet
3906 KHEP-CI-3906 Zone 5B Division 31 28-Feb-2018 1-Mar-2018 11:00 AM Open
foundation Zone 5B Public Toilet B1 B1
Compaction test and formation existing level STA 0+225 to 0+337
3907 KHEP-CI-3907 Road 02 NA Division 31 28-Feb-2018 1-Mar-2018 9:30 AM Open
Road 02

ELECTRICAL
Inspect installation layout PVC Conduit Pipes, Fittings & Octagonal 10-05-2017 (11-
Cluster 69/B- 11-05-2017 9:30:00 AM Approved w/
001 KHEP-EL-0001 Steel Boxes for Lighting, Power & Fire Alarm system embedded for
02 (Mock-up)
05-2017-Recall)
15 may 2017 10:00 AM
17-May-2017 B comments
Closed
under slab 14 may 2017
Zone 4B /C- Approved w/
002 KHEP-EL-0002 Installation of Steel box for Switches at columns of C69
69 (B2)
21-May-2017 22-May-2017 9:00 AM 23-May-2017 B comments
Closed

Zone 4B /C- Approved w/


003 KHEP-EL-0003 Installation of Steel box for Power Outlets at columns of C69
69 (B2)
21-May-2017 22-May-2017 9:00 AM 24-May-2017 B comments
Closed

Installation of PVC Conduit & Block-Out for Lighting and Power at Zone 1A, Approved w/
004 KHEP-EL-0004
Ground Floor Columns of Cluster 1
27-May-2017 28-May-2017 8:30 AM 28-May-2017 B comments
Closed

Installation of PVC Conduit & Block-Out for Ground Floor Socket Zone 1A, Approved w/
005 KHEP-EL-0005
Outlet and Lighting Switches at C-2 Columns Cluster 2
31-May-2017 1-Jun-2017 8:30 AM 3-Jun-2017 B comments
Closed

Installation of Galvanized Steel Box for Socket Outlet and Lighting Zone 1A,
006 KHEP-EL-0006
Switches at Ground Floor Columns of C-2 Cluster 2
4-Jun-2017 5-Jun-2017 8:30 AM 6-Jun-2017 E Rejected Closed

Installation of Galvanized Steel Box for Socket Outlet and Lighting Zone 1A, Approved w/
006.1 KHEP-EL-0006-01
Switches at Ground Floor Columns of C-2 Cluster 2
10-Jun-2017 11-Jun-2017 8:30 AM 15-Jun-2017 B comments
Closed

Installation of 110mm dia. PVC conduit from KWH going to Panel Zone 4B, Approved w/
007 KHEP-EL-0007
board at Ground floor Cluster 68
13-Jun-2017 14-Jun-2017 8:30 AM 15-Jun-2017 B comments
Closed

Installation of PVC Conduits and Galvanized steel Boxes for power


and lighting system at roof slab of cluster 69. ( for lighting and Zone 4B, Approved w/
008 KHEP-EL-0008
power outlet, mechanical equipment power supply, grounding and Cluster 69
19-Jun-2017 20-Jun-2017 9:30 AM 22-Jun-2017 B comments
Closed
switches)
Installation of 110mm dia. PVC conduit from KWH going to Panel Zone 4A, Approved w/
009 KHEP-EL-0009
board at Ground floor Cluster 66
1-Jul-2017 2-Jul-2017 8:30 AM 3-Jul-2017 B comments
Closed

Installation of PVC Conduits and Galvanized steel Boxes for socket


Approved w/
010 KHEP-EL-0010 outlet at Ground Floor Columns ( G/L A/6 and E/6) Cluster 15 Zone Cluster 15 Zone 1B Division 26 4-Jul-2017 5-Jul-2017 8:00 AM 6-Jul-2017 B comments
Closed
1B, Cluster 15
Installation of PVC Conduits and Galvanized Steel Boxes for socket
outlet ( GL A/6 & E/6), PVC conduit riser up to Lighting and power
Approved w/
011 KHEP-EL-0011 ( GL B2 & D2) and PVC Conduit riser up to first floor for mechanical Cluster 13 Zone 1B Division 26 5-Jul-2017 6-Jul-2017 8:00 AM 8-Jul-2017 B comments
Closed
devices ( GL B/3 & D/3) at Ground floor Columns of Cluster 13 Zone
1B
Installation of PVC Conduits and Galvanized Steel Boxes for socket
outlet ( GL A/6 & E/6), PVC conduit riser up to roof floor for Lighting
Approved w/
012 KHEP-EL-0012 and power ( GL B2 & D2) and PVC Conduit riser up to first floor for Cluster 14 Zone 1B Division 26 8-Jul-2017 9-Jul-2017 9:00 AM 9-Jul-2017 B comments
Closed
mechanical devices ( GL B/3 & D/3) at Ground floor Columns of
Cluster 14 Zone 1B
Installation of PVC Conduits and Galvanized steel Boxes for socket
013 KHEP-EL-0013
outlet at Ground Floor Columns Cluster 68 Zone 4B
Cluster 68 Zone 4B Division 26 9-Jul-2017 10-Jul-2017 8:00 AM 11-Jul-2017 A Approved Closed

Installation of 110mm dia. PVC conduit from KWH going to Panel


014 KHEP-EL-0014
board at Ground floor of Cluster 69 Zone 4B
Cluster 69 Zone 4B Division 26 9-Jul-2017 10-Jul-2017 9:00 AM 11-Jul-2017 A Approved Closed

Installation of PVC Conduits and Galvanized steel Boxes for power


and lighting system at First Floor slab of cluster 1. ( for lighting and
015 KHEP-EL-0015
Socket outlet, mechanical equipment power supply, grounding and
Cluster 01 Zone 1A Division 26 9-Jul-2017 10-Jul-2017 10:30 AM 11-Jul-2017 A Approved Closed
switches) Zone 1A, Cluster 1
Installation of 110mm dia. PVC conduit from KWH going to Panel Approved w/
016 KHEP-EL-0016
board at Ground floor of Cluster 73 Zone 4B
Cluster 73 Zone 4B Division 26 12-Jul-2017 13-Jul-2017 8:00 AM 15-Jul-2017 B comments
Closed

Installation of PVC Conduits and Galvanized steel Boxes for socket


017 KHEP-EL-0017
outlet at First Floor Columns Cluster 1 Zone 1A
Cluster 01 Zone 1A Division 26 16-Jul-2017 17-Jul-2017 10:30 AM 18-Jul-2017 A Approved Closed

Installation of PVC Conduits and Galvanized Steel Boxes for socket


outlet ( GL A/6 & E/6), PVC conduit riser up to roof floor for Lighting
018 KHEP-EL-0018 and power ( GL B2 & D2) and PVC Conduit riser up to first floor for Cluster 12 Zone 1B Division 26 17-Jul-2017 18-Jul-2017 10:30 AM 19-Jul-2017 A Approved Closed
mechanical devices ( GL B/3 & D/3) at Ground floor Columns of
Cluster 12 Zone 1B
Installation of PVC Conduits and Galvanized Steel Boxes for socket
outlet ( GL A/6 & E/6), PVC conduit riser up to roof floor for Lighting
019 KHEP-EL-0019 and power ( GL B2 & D2) and PVC Conduit riser up to first floor for Cluster 11 Zone 1B Division 26 18-Jul-2017 19-Jul-2017 10:30 AM 20-Jul-2017 A Approved Closed
mechanical devices ( GL B/3 & D/3) at Ground floor Columns of
Cluster 11 Zone 1B

Installation of PVC Conduits and Galvanized steel Boxes for power


Approved w/
020 KHEP-EL-0020 and lighting system at First Floor slab of cluster 2 ( for lighting and Cluster 02 Zone 1A Division 26 24-Jul-2017 25-Jul-2017 10:30 AM 25-Jul-2017 B comments
Closed
Socket outlet, mechanical equipment power supply) Zone 1A

Installation of PVC Conduits and Galvanized steel Boxes for power


and lighting system at First Floor slab of cluster 15 ( for lighting and
Approved w/
021 KHEP-EL-0021 Socket outlet, mechanical equipment power system) Cluster 15 Zone 1B Division 26 29-Jul-2017 30-Jul-2017 9:30 AM 30-Jul-2017 B comments
Closed
Zone
1B, Cluster 15
Installation of 110mm dia. PVC conduit from KWH Meter going to
Approved w/
022 KHEP-EL-0022 Panel board at Ground floor of Cluster 81 Cluster 81 Zone 4A Division 26 29-Jul-2017 30-Jul-2017 10:30 AM 30-Jul-2017 B comments
Closed
Zone 4A, Cluster 81
Installation of PVC Conduits and Galvanized Steel Boxes for socket
outlet ( GL A/6 & E/6), PVC conduit riser up to roof floor for Lighting
and power ( GL B2 & D2) and PVC Conduit riser up to first floor for
023 KHEP-EL-0023
mechanical devices ( GL B/3 & D/3) at Ground floor Columns of
Cluster 10 Zone 1B Division 26 31-Jul-2017 1-Aug-2017 10:00 AM 1-Aug-2017 A Approved Closed
Cluster 10 Zone 1B,
Cluster 10

Installation of PVC Conduits and Galvanized Steel Boxes for socket


outlet ( GL A/6 & E/6), PVC conduit riser up to roof floor for Lighting
024 KHEP-EL-0024 and power ( GL B2 & D2) and PVC Conduit riser up to first floor for Cluster 17 Zone 1B Division 26 6-Aug-2017 7-Aug-2017 8:00 AM 7-Aug-2017 A Approved Closed
mechanical devices ( GL B/3 & D/3) at Ground floor Columns of
Cluster 107 Zone 1B, Cluster 17

Installation of PVC Conduits and Galvanized steel Boxes for socket


Approved w/
025 KHEP-EL-0025 outlet at First Floor Columns Cluster 2 Zone Cluster 02 Zone 1A Division 26 6-Aug-2017 7-Aug-2017 8:30 AM 7-Aug-2017 B comments
Closed
1A, Cluster 2
Installation of PVC Conduits and Galvanized steel Boxes for power
and lighting system at First Floor slab of cluster 13 ( for lighting and
026 KHEP-EL-0026 Socket outlet, mechanical equipment power system) Cluster 13 Zone 1B Division 26 6-Aug-2017 7-Aug-2017 9:00 AM 7-Aug-2017 A Approved Closed
Zone 1B,
Cluster 13
Installation of PVC Conduits and Galvanized steel Boxes for socket
outlet and Lighting switch at First Floor columns of Cluster 15 Approved w/
027 KHEP-EL-0027 Cluster 15 Zone 1B Division 26 7-Aug-2017 8-Aug-2017 9:00 AM 8-Aug-2017 B comments
Closed
Zone 1B, Cluster 15
Installation of PVC conduit and galvanized steel boxes for Power and
Lighting System at First floor slab of Cluster 14. (for Lighting and
028 KHEP-EL-0028 socket outlet, mechanical equipment power system) Cluster 14 Zone 1B Divition 26 10-Aug-2017 12-Aug-2017 10:30 AM 13-Aug-2017 A Approved Closed
Zone 1B, Cluster
14
Installation of 32mm PVC Conduit for grounding at Ground Floor of
029 KHEP-EL-0029 Cluster 69 Cluster 69 Zone 4B Divition 26 12-Aug-2017 13-Aug-2017 8:30 AM 14-Aug-2017 A Approved Closed
Zone 4B, Cluster 69
Installation of 50mm PVC sleeves for Grounding at grade Beam of
030 KHEP-EL-0030 cluster 81 Cluster 81 Zone 4A Divition 26 14-Aug-2017 15-Aug-2017 8:20 AM 17-Aug-2017 A Approved Closed
Zone 4A, Cluster 81
Installation of Galvanized Steel Box and PVC conduit for Socket
031 KHEP-EL-0031 Outlet at First Floor Columns of Cluster 13 Zone 1B, Cluster 13 Zone 1B Divition 27 14-Aug-2017 15-Aug-2017 8:40 AM 17-Aug-2017 A Approved Closed
Cluster 13
Installation of PVC Conduits and Galvanized Steel Boxes for socket
032 KHEP-EL-0032 outlet ( GL A/6 & E/6) Columns of Cluster 5 Zone 1B, Cluster 5 Zone 1B, Divition 26 15-Aug-2017 16-Aug-2017 8:00 AM 17-Aug-2017 A Approved Closed
Cluster 5
Installation of PVC Conduits and Galvanized Steel Boxes for socket
Approved w/
033 KHEP-EL-0033 outlet ( GL A/6 & E/6) Columns of Cluster 7 Zone 1B, Cluster 7 Zone 1B, Divition 26 15-Aug-2017 16-Aug-2017 8:20 AM 17-Aug-2017 B comments
Closed
Cluster 7
Installation of Galvanized Steel Box and PVC conduit for Socket
034 KHEP-EL-0034 Outlet at First Floor Columns of Cluster 14 Zone 1B, Cluster 14 Zone 1B, Divition 26 16-Aug-2017 17-Aug-2017 11:00 AM 19-Aug-2017 A Approved Closed
Cluster 14
Installation of Galvanized Steel Box and PVC conduit for Socket
Outlet and Lighting Switcher at Ground Floor Columns of Cluster 3
035 KHEP-EL-0035
Zone
Cluster 3 Zone 1A Divition 26 16-Aug-2017 17-Aug-2017 11:15 AM 19-Aug-2017 A Approved Closed
1A, Cluster 3
Installation of PVC conduit and Galvanized steel boxes for Power and
Lighting System at First floor slab of Cluster 12. (for Lighting and
socket outlet, mechanical equipment power system)
036 KHEP-EL-0036
Zone 1B,
Cluster 12 Zone 1B Divition 26 17-Aug-2017 19-Aug-2017 9:00 AM 20-Aug-2017 A Approved Closed
Cluster 12
Installation of PVC conduit and Galvanized steel boxes for Power and
Lighting System at First floor slab of Cluster 1 (for Lighting and
socket outlet, mechanical equipment power system)
037 KHEP-EL-0037
Zone 1A,
Cluster 01 Zone 1A Divition 26 17-Aug-2017 19-Aug-2017 10:00 AM 20-Aug-2017 A Approved Closed
Cluster 1

Installation of PVC Conduits and Galvanized Steel Boxes for socket


038 KHEP-EL-0038 outlet First Floor Columns of Cluster 12 Zone 1B, Cluster 12 Zone 1B Divition 26 22-Aug-2017 23-Aug-2017 9:00 AM 26-Aug-2017 A Approved Closed
Cluster 12
Installation of PVC conduit and Galvanized steel boxes for Power and
Lighting System at First floor slab of Cluster 68. (for Lighting and
socket outlet, mechanical equipment power system)
039 KHEP-EL-0039
Zone 4B,
Cluster 68 Zone 4B Divition 26 23-Aug-2017 24-Aug-2017 10:45 AM 26-Aug-2017 E Rejected Closed
Cluster 68
Installation of PVC conduit and Galvanized steel boxes for Power and
Lighting System at First floor slab of Cluster 68. (for Lighting and
socket outlet, mechanical equipment power system) Approved w/
39.1 KHEP-EL-0040
Zone 4B,
Cluster 68 Zone 4B Divition 26 26-Aug-2017 27-Aug-2017 8:00 AM 29-Aug-2017 B comments
Closed
Cluster 68
Installation of PVC conduit and Galvanized steel boxes for Power and
Lighting System at First floor slab of Cluster 11 (for Lighting and
socket outlet, mechanical equipment power system)
040 KHEP-EL-0041
Zone 1B,
Cluster 11 Zone 1B Divition 26 23-Aug-2017 24-Aug-2017 11:15 AM 26-Aug-2017 E Rejected Closed
Cluster 11
Installation of PVC conduit and Galvanized steel boxes for Power and
Lighting System at First floor slab of Cluster 11 (for Lighting and
socket outlet, mechanical equipment power system) Approved w/
40.1 KHEP-EL-0040-01
Zone 1B,
Cluster 11 Zone 1B Divition 26 26-Aug-2017 27-Aug-2017 8:00 AM 29-Aug-2017 B comments
Closed
Cluster 11

Installation of 110mm dia. PVC conduit from KWH Meter going to


041 KHEP-EL-0041 Panel board at Ground floor of Cluster 75 Zone Cluster 75 Zone 4B Divition 26 28-Aug-2017 29-Aug-2017 8:00 AM 29-Aug-2017 A Approved Closed
4B, Cluster 75
Installation of 110mm and 32mm pvc conduit for main feeder and
042 KHEP-EL-0042 Grounding at Ground floor of Cluster 15 Zone Cluster 15 Zone 1B Divition 26 28-Aug-2017 29-Aug-2017 8:30 AM 29-Aug-2017 A Approved Closed
1B, Cluster 15
Installation of PVC conduit and Galvanized steel boxes for Power and
Lighting System at First floor slab of Cluster 10 (for Lighting and
socket outlet, mechanical equipment power system)
043 KHEP-EL-0043
Zone 1B,
Cluster 10 Zone 1B Divition 26 29-Aug-2017 30-Aug-2017 11:00 AM 30-Aug-2017 A Approved Closed
Cluster 10

Installation of 110mm dia. PVC conduit from KWH Meter going to


Approved w/
044 KHEP-EL-0044 Panel board at Ground floor of Cluster 71 Zone Cluster 71 Zone 4B Divition 26 5-Sep-2017 6-Sep-2017 8:00 AM 9-Sep-2017 B comments
Closed
4B, Cluster 71
Installation of PVC Conduits and Galvanized Steel Boxes for socket
045 KHEP-EL-0045 outlet First Floor Columns of Cluster 11 Zone 1B, Cluster 11 Zone 1B Divition 26 5-Sep-2017 6-Sep-2017 9:00 AM 9-Sep-2017 A Approved Closed
Cluster 11
Installation of PVC Conduits and block out (styrofoam) for socket
outlet and lighting switch at Ground Floor Columns of Cluster 81 Approved w/
046 KHEP-EL-0046 Cluster 81 Zone 4A Divition 26 7-Sep-2017 9-Sep-2017 8:30 AM 11-Sep-2017 B comments
Closed
Zone 4A, Cluster 81
Installation of 50mm PVCsleeves for grounding system at grade
Approved w/
047 KHEP-EL-0047 beam of Cluster 75 Zone Cluster 75 Zone 4B Division 26 12-Sep-2017 13-Sep-2017 8:30 AM 14-Sep-2017 B comments
Closed
4B, Cluster 75

Installation of PVC conduits and galvanized steel boxes for power


Approved w/
048 KHEP-EL-0048 and lighting system at roof floor slab of cluster 15 (for lighting and Cluster 15 Zone 1B Division 26 16-Sep-2017 17-Sep-2017 9:00 AM 18-Sep-2017 B comments
Closed
socket outlet and mechanical equipment system) Zone 1B, Cluster 15

Installation of PVC conduits and galvanized steel boxes for power


Approved w/
049 KHEP-EL-0049 and lighting system at first floor slab of cluster 17 (for lighting and Cluster 17 Zone 1B Division 26 16-Sep-2017 17-Sep-2017 10:00 AM 18-Sep-2017 B comments
Closed
socket outlet and mechanical equipment system) Zone 1B, Cluster 17

Installation of 110mm dia PVC conduit from KWH meter going to


050 KHEP-EL-0050 panel board ar ground floor of Cluster 61 for main feeder Zone 3B, Cluster 61 Zone 3B Division 26 16-Sep-2017 17-Sep-2017 8:30 AM 18-Sep-2017 A Approved Closed
Cluster 61
Installation of 50mm PVC sleeves for grounding system at grade
Approved w/
051 KHEP-EL-0051 beam of Cluster 61 Zone Cluster 61 Zone 3B Division 26 18-Sep-2017 19-Sep-2017 8:30 AM 20-Sep-2017 B comments
Closed
3B, Cluster 61
Installation of PVC Conduits and block out (Styrofoam) for socket
outlet and lighting switch at Ground Floor Columns of Cluster 4
052 KHEP-EL-0052 Cluster 4 Zone 1A Division 26 20-Sep-2017 21-Sep-2017 10:00 AM 24-Sep-2017 A Approved Closed
Zone 1A, Cluster 4

Installation of PVC conduits and galvanized steel boxes for power


053 KHEP-EL-0053 and lighting system at first floor slab of cluster 2 (for lighting and Cluster 02 Zone 1A Division 26 20-Sep-2017 21-Sep-2017 11:00 AM 24-Sep-2017 A Approved Closed
socket outlet and mechanical equipment system) Zone 1A, Cluster 2

Installation of PVC Conduits and block out (Styrofoam) for socket


outlet at Ground Floor Columns of Cluster 16 Approved w/
054 KHEP-EL-0054
Zone 1B, Cluster
Cluster 16 Zone 1B Division 26 23-Sep-2017 24-Sep-2017 9:00 AM 25-Sep-2017 B comments
Closed
16
Installation of 110mm and 32 mm dia PVC conduit for Main Feeder
Approved w/
055 KHEP-EL-0055 and Grounding at ground floor of Cluster 2 Zone 1A, Cluster Cluster 02 Zone 1A Division 26 23-Sep-2017 24-Sep-2017 10:00 AM 25-Sep-2017 B comments
Closed
2

Installation of PVC Conduits and block out (Styrofoam) for socket


Approved w/
056 KHEP-EL-0056 outlet at Ground Floor Columns of Cluster 8 Cluster 8 Zone 1B Division 26 23-Sep-2017 24-Sep-2017 10:00 AM 25-Sep-2017 B comments
Closed
Zone 1B, Cluster 8

Installation of PVC Conduit for socket outlet at Ground Floor Slab


Approved w/
057 KHEP-EL-0057 (SOG) of Cluster 69 Cluster 69 Zone 1B Division 26 23-Sep-2017 24-Sep-2017 10:20 AM 25-Sep-2017 B comments
Closed
Zone 1B, Cluster 69
Installation of PVC Conduits and block out (Styrofoam) for socket
outlet and Lighting switch at Ground Floor Columns of Cluster 66 Approved w/
058 KHEP-EL-0058 Cluster 66 Zone 4A Division 26 23-Sep-2017 24-Sep-2017 11:00 AM 25-Sep-2017 B comments
Closed
Zone 4A, Cluster 66
Installation of PVC Conduits and block out (Styrofoam) for socket
outlet at Ground Floor Columns of Cluster 75
059 KHEP-EL-0059
Zone 4B, Cluster
Cluster 75 Zone 4B Division 26 25-Sep-2017 26-Sep-2017 8:30 AM 4-Oct-2017 A Approved Closed
75

Installation of PVC conduits and galvanized steel boxes for power


Approved w/
060 KHEP-EL-0060 and lighting system at first floor slab of cluster 5 (for lighting and Cluster 5 Zone 1B Division 26 25-Sep-2017 26-Sep-2017 10:00 AM 28-Sep-2017 B comments
Closed
socket outlet and mechanical equipment system) Zone 1B, Cluster 5

Installation of PVC conduits and galvanized steel boxes for power


Approved w/
061 KHEP-EL-0061 and lighting system at first floor slab of cluster 7 (for lighting and Cluster 7 Zone 1B Division 26 27-Sep-2017 28-Sep-2017 10:00 AM 30-Sep-2017 B comments
Closed
socket outlet and mechanical equipment system) Zone 1B, Cluster 7

Installation of PVC Conduits and block out (Styrofoam) for socket


outlet at Ground Floor Columns of Cluster 19 Approved w/
062 KHEP-EL-0062
Zone 1B, Cluster
Cluster 19 Zone 1B Division 26 27-Sep-2017 28-Sep-2017 10:30 AM 1-Oct-2017 B comments
Closed
19
Installation of 50mm PVC sleeves for grounding system at grade
Approved w/
063 KHEP-EL-0063 beam of Cluster 48 Zone Cluster 48 Zone 3B Division 26 27-Sep-2017 28-Sep-2017 10:40 AM 1-Oct-2017 B comments
Closed
3B, Cluster 48
Installation of 50mm PVC sleeves for grounding system at grade
Zone 3B, Approved w/
064 KHEP-EL-0064 beam of Cluster 58 Zone
Cluster 58
Zone 3B Division 26 1-Oct-2017 2-Oct-2017 8:00 AM 4-Oct-2017 B comments
Closed
3B, Cluster 58
Installation of 50mm PVC sleeves for grounding system at grade
Zone 4B, Approved w/
065 KHEP-EL-0065 beam of Cluster 71 Zone
Cluster 71
Zone 3B Division 26 1-Oct-2017 2-Oct-2017 8:30 AM 4-Oct-2017 B comments
Closed
4B, Cluster 71

Installation of Gl boxes and PVC conduit socket outlet and switches


066 KHEP-EL-0066 (for lighting and mechanical equipment) at ground floor and First Cluster 69 Zone 4B Division 26 1-Oct-2017 2-Oct-2017 10:00 AM RECALLED
Floor of mock - up building cluster 69 Zone 4B, Cluster 69

Installation of PVC conduits and galvanized steel boxes for power


Approved w/
067 KHEP-EL-0067 and lighting system at first floor slab of cluster 14 (for lighting and Cluster 14 Zone 1B Division 26 3-Oct-2017 4-Oct-2017 9:30 AM 4-Oct-2017 B comments
Closed
socket outlet and mechanical equipment system) Zone 1B, Cluster 14

Installation of PVC Conduits and block out (Styrofoam) for socket


Approved w/
068 KHEP-EL-0068 outlet at Ground Floor Columns of Cluster 6 Cluster 6 Zone 1B Division 26 3-Oct-2017 4-Oct-2017 10:00 AM 4-Oct-2017 B comments
Closed
Zone 1B, Cluster 6

Installation of 50mm PVC sleeves for grounding system at grade


Approved w/
069 KHEP-EL-0069 beam of Cluster 73 Zone Cluster 73 Zone 4B Division 26 5-Oct-2017 7-Oct-2017 9:00 AM 7-Oct-2017 B comments
Closed
4B, Cluster 73
Installation of PVC Conduits and block out (Styrofoam) for socket
outlet at Ground Floor Columns of Cluster 20 Approved w/
070 KHEP-EL-0070
Zone 1B, Cluster
Cluster 20 Zone 1B Division 26 5-Oct-2017 7-Oct-2017 9:30 AM 7-Oct-2017 B comments
Closed
20

Installation of PVC conduits and galvanized steel boxes for power


Approved w/
071 KHEP-EL-0071 and lighting system at first floor slab of cluster 11 (for lighting and Cluster 11 Zone 1B Division 26 7-Oct-2017 8-Oct-2017 9:00 AM 9-Oct-2017 B comments
Closed
socket outlet and mechanical equipment system) Zone 1B, Cluster 11

Installation of 50mm PVC sleeves for grounding system at grade


Approved w/
072 KHEP-EL-0072 beam of Cluster 44 Zone Cluster 44 Zone 2A, Division 26 8-Oct-2017 9-Oct-2017 8:30 AM 9-Oct-2017 B comments
Closed
2A, Cluster 44
Installation of PVC conduits and GI boxes for first floor and roof
Approved w/
073 KHEP-EL-0073 floor lighting system at roof slab of Cluster 13 Zone 1B, Cluster 13 Zone 1B Division 26 9-Oct-2017 10-Oct-2017 9:00 AM 11-Oct-2017 B comments
Closed
Cluster 13
Installation of PVC conduit for roof socket outlet at roof slab of
Approved w/
074 KHEP-EL-0074 Cluster 13 Zone Cluster 13 Zone 1B Division 26 9-Oct-2017 10-Oct-2017 9:30 AM 11-Oct-2017 B comments
Closed
1B, Cluster 13

Installation of PVC conduits and GI boxes for mechanical power


Approved w/
075 KHEP-EL-0075 system (including power supply, grounding and thermostat) at roof Cluster 13 Zone 1B Division 26 9-Oct-2017 10-Oct-2017 10:00 AM 11-Oct-2017 B comments
Closed
slab of Cluster 13 Zone 1B, Cluster 13

Installation of 50mm PVC sleeves for grounding system at grade


Approved w/
076 KHEP-EL-0076 beam of Cluster 54 Zone 3B, Cluster 54 Zone 3B Division 26 9-Oct-2017 10-Oct-2017 9:30 AM 12-Oct-2017 B comments
Closed
Cluster 54
Installation of PVC conduits and GI boxes for first floor and roof
Approved w/
077 KHEP-EL-0077 lighting system at roof slab of Cluster 10 Zone Cluster 10 Zone 1B Division 26 10-Oct-2017 11-Oct-2017 8:30 AM 11-Oct-2017 B comments
Closed
1B, Cluster 10
Installation of PVC conduit for roof socket outlet at roof slab of
Approved w/
078 KHEP-EL-0078 Cluster 10 Zone Cluster 10 Zone 1B Division 26 10-Oct-2017 11-Oct-2017 9:00 AM 11-Oct-2017 B comments
Closed
1B, Cluster 10

Installation of PVC conduits and GI boxes for mechanical power


Approved w/
079 KHEP-EL-0079 system (including power supply, grounding and thermostat) at roof Cluster 10 Zone 1B Division 26 10-Oct-2017 11-Oct-2017 10:00 AM 11-Oct-2017 B comments
Closed
slab of Cluster 10 Zone 1B, Cluster 10

Installation of PVC conduit blockout (styrofoam) for socket outlet at


Approved w/
080 KHEP-EL-0080 ground floor column of Cluster 44 Cluster 44 Zone 2A Division 26 10-Oct-2017 11-Oct-2017 10:20 AM 11-Oct-2017 B comments
Closed
Zone 2A, Cluster 44
Installation of PVC conduit and blockout (styrofoam) for lighting
Approved w/
081 KHEP-EL-0081 switch at ground floor column of Cluster 44 Cluster 44 Zone 2A Division 26 10-Oct-2017 11-Oct-2017 10:40 AM 11-Oct-2017 B comments
Closed
Zone 2A, Cluster 44
Installation of 50mm PVC sleeves for grounding system at grade
Approved w/
082 KHEP-EL-0082 beam of Cluster 51 Zone 3B, Cluster 51 Zone 3B Division 26 10-Oct-2017 11-Oct-2017 11:20 AM 12-Oct-2017 B comments
Closed
Cluster 51
Installation of 50mm PVC sleeves for grounding system at grade
Approved w/
083 KHEP-EL-0083 beam of Cluster 52 Zone 3B, Cluster 52 Zone 3B Division 26 14-Oct-2017 15-Oct-2017 8:00 AM 17-Oct-2017 B comments
Closed
Cluster 52

Installation of 150mm PVC sleeves for Main Feeder Power Supply


Approved w/
084 KHEP-EL-0084 and 50 mm PVC Sleeves for grounding system at grade beam of Cluster 9 Zone 1B Division 26 14-Oct-2017 15-Oct-2017 9:00 AM 17-Oct-2017 B comments
Closed
Cluster 9 Zone 1B, Cluster 9

Installation of 50mm PVC sleeves for grounding system at grade


Approved w/
085 KHEP-EL-0085 beam of Cluster 27 Zone 2B, Cluster 27 Zone 2B Division 26 16-Oct-2017 17-Oct-2017 8:00 AM 23-Oct-2017 B comments
Closed
Cluster 27
Installation of PVC conduits and GI boxes for First Floor and Roof
Approved w/
086 KHEP-EL-0086 Floor Lighting System at roof slab of Cluster 12 Cluster 12 Zone 1B Division 26 16-Oct-2017 17-Oct-2017 9:30 AM 18-Oct-2017 B comments
Closed
Zone 1B, Cluster 12
Installation of PVC conduit for roof socket outlet at roof slab of
Approved w/
087 KHEP-EL-0087 Cluster 12 Cluster 12 Zone 1B Division 26 16-Oct-2017 17-Oct-2017 10:00 AM 18-Oct-2017 B comments
Closed
Zone 1B, Cluster 12

Installation of PVC conduits and GI boxes for mechanical power


Approved w/
088 KHEP-EL-0088 system (including power supply, grounding and thermostat) at roof Cluster 12 Zone 1B Division 26 16-Oct-2017 17-Oct-2017 10:30 AM 24-Oct-2017 B comments
Closed
slab of Cluster 12 Zone 1B, Cluster 12

Installation of PVC conduits for Main Feeder and Grounding at


Cluster 1 Ground Floor (32mm for Grounding and 4 inch for Main
089 KHEP-EL-0089
Feeder) Note: For Four (4) Apartments Only
Cluster 01 Zone 1A Division 26 17-Oct-2017 18-Oct-2017 8:00 AM 23-Oct-2017 E Rejected Closed
Zone 1A, Cluster 1

Installation of PVC conduits for Main Feeder and Grounding at


089.1 KHEP-EL-0089-01 Cluster 1 Ground Floor (32mm for Grounding and 4 inch for Main Cluster 01 Zone 1A Division 26 30-Oct-2017 31-Oct-2017 9:30 AM 6-Nov-2017 E Rejected Closed
Feeder) Note: For Four (4) Apartments Only Zone 1A, Cluster 1

Installation of 50mm PVC sleeves for grounding system at grade


Approved w/
090 KHEP-EL-0090 beam of Cluster 43 Zone 2A, Cluster 43 Zone 2A Division 26 17-Oct-2017 18-Oct-2017 9:30 AM 23-Oct-2017 B comments
Closed
Cluster 43
Installation of 50mm PVC sleeves for grounding system at grade
Approved w/
091 KHEP-EL-0091 beam of Cluster 72 Zone 4B, Cluster 72 Zone 4B Division 26 21-Oct-2017 22-Oct-2017 8:45 AM 24-Oct-2017 B comments
Closed
Cluster 72
Installation of 50mm PVC sleeves for grounding system at grade
Approved w/
092 KHEP-EL-0092 beam of Cluster 35 Zone 2B, Cluster 35 Zone 2B Division 26 21-Oct-2017 22-Oct-2017 9:20 AM 23-Oct-2017 B comments
Closed
Cluster 35
Installation of PVC conduit blockout (styrofoam) for socket outlet at
Approved w/
093 KHEP-EL-0093 ground floor column of Cluster 43 Cluster 43 Zone 2A Division 26 21-Oct-2017 22-Oct-2017 10:00 AM 23-Oct-2017 B comments
Closed
Zone 2A, Cluster 43
Installation of PVC conduit blockout (styrofoam) for Lighting switch
Approved w/
094 KHEP-EL-0094 at ground floor column of Cluster 43 Cluster 43 Zone 2A Division 26 21-Oct-2017 22-Oct-2017 10:20 AM 23-Oct-2017 B comments
Closed
Zone 2A, Cluster 43
Installation of PVC conduits for Main Feeder and Grounding at
Cluster 1 Ground Floor (32mm for Grounding and 4 inch for Main
095 KHEP-EL-0095
Feeder) Note: For the remaining 2 Apartments
Cluster 01 Zone 1A Division 26 21-Oct-2017 22-Oct-2017 11:00 AM 23-Oct-2017 E Rejected Closed
Zone 1A, Cluster 1
Installation of PVC conduits for Main Feeder and Grounding at
Cluster 1 Ground Floor (32mm for Grounding and 4 inch for Main
095.1 KHEP-EL-0095-01
Feeder) Note: For the remaining 2 Apartments Zone 1A,
Cluster 01 Zone 1A Division 26 30-Oct-2017 31-Oct-2017 9:30 AM 6-Nov-2017 E Rejected Closed
Cluster 1
Installation of 50mm PVC sleeves for grounding system at grade
Approved w/
096 KHEP-EL-0096 beam of Cluster 33 Zone 2B, Cluster 33 Zone 2B Division 26 21-Oct-2017 22-Oct-2017 2:30 PM 23-Oct-2017 B comments
Closed
Cluster 33
Installation of PVC conduits and GI boxes for First Floor and Roof
Approved w/
097 KHEP-EL-0097 Floor Lighting System at roof slab of Cluster 68 Cluster 68 Zone 4B Division 26 22-Oct-2017 23-Oct-2017 9:00 AM 24-Oct-2017 B comments
Closed
Zone 4B, Cluster 68
Installation of PVC conduit for Roof Socket Outlet at Roof Slab of
Approved w/
098 KHEP-EL-0098 Cluster 68 Zone Cluster 68 Zone 4B Division 26 22-Oct-2017 23-Oct-2017 9:30 AM 24-Oct-2017 B comments
Closed
4B, Cluster 68

Installation of PVC conduits and GI boxes for mechanical power


Approved w/
099 KHEP-EL-0099 system (including power supply, grounding and thermostat) at roof Cluster 68 Zone 4B Division 26 22-Oct-2017 23-Oct-2017 10:00 AM 24-Oct-2017 B comments
Closed
slab of Cluster 68 Zone 4B, Cluster 68

Installation of PVC conduits and GI boxes for First Floor and Roof
Approved w/
100 KHEP-EL-0100 Floor Lighting System at roof slab of Cluster 17 Cluster 17 Zone 1B Division 26 23-Oct-2017 24-Oct-2017 8:00 AM 25-Oct-2017 B comments
Closed
Zone 1B, Cluster 17
Installation of PVC conduit for Roof Socket Outlet at Roof Slab of
Approved w/
101 KHEP-EL-0101 Cluster 17 (Power) Cluster 17 Zone 1B Division 26 23-Oct-2017 24-Oct-2017 8:30 AM 25-Oct-2017 B comments
Closed
Zone 1B, Cluster 17

Installation of PVC conduits and GI boxes for mechanical power


Approved w/
102 KHEP-EL-0102 system (including power supply, grounding and thermostat / control) Cluster 17 Zone 1B Division 26 23-Oct-2017 24-Oct-2017 9:00 AM 25-Oct-2017 B comments
Closed
at roof slab of Cluster 17 Zone 1B, Cluster 17

Installation of PVC conduits for Main Feeder and Grounding at


Cluster 14 Ground Floor (32mm for Grounding and 4 inch for Main
103 KHEP-EL-0103 Cluster 14 Zone 1B Division 26 23-Oct-2017 24-Oct-2017 9:30 AM RECALLED
Feeder) Zone 1B,
Cluster 14
Installation of PVC conduits and GI boxes for First Floor and Roof
Approved w/
104 KHEP-EL-0104 Floor Lighting System at roof slab of Cluster 5 Zone 1B, Cluster 5 Zone 1B Division 26 25-Oct-2017 26-Oct-2017 8:30 AM 28-Oct-2017 B comments
Closed
Cluster 5
Installation of PVC conduit for roof socket outlet at roof slab of
Approved w/
105 KHEP-EL-0105 Cluster 5 Cluster 5 Zone 1B Division 26 25-Oct-2017 26-Oct-2017 8:50 AM 28-Oct-2017 B comments
Closed
Zone 1B, Cluster 5

Installation of PVC conduits and GI boxes for mechanical equipment


Approved w/
106 KHEP-EL-0106 control system at roof slab of Cluster 5 (for First Floor and Roof Floor Cluster 5 Zone 1B Division 26 25-Oct-2017 26-Oct-2017 9:20 AM 28-Oct-2017 B comments
Closed
Equipment) Zone 1B, Cluster 5

Installation of PVC conduits and GI boxes for mechanical equipment


Approved w/
107 KHEP-EL-0107 power system at roof slab of Cluster 5 (for First Floor and Roof Floor Cluster 5 Zone 1B Division 26 25-Oct-2017 26-Oct-2017 9:50 AM 28-Oct-2017 B comments
Closed
Equipment) Zone 1B, Cluster 5

Installation of PVC conduits and GI boxes for First Floor and Roof
Approved w/
108 KHEP-EL-0108 Floor Lighting System at roof slab of Cluster 7 Zone 1B, Cluster 7 Zone 1B Division 26 29-Oct-2017 30-Oct-2017 8:20 AM 31-Oct-2017 B comments
Closed
Cluster 7
Installation of PVC conduit for roof Power socket outlet at roof slab of
Approved w/
109 KHEP-EL-0109 Cluster 7 Zone 1B, Cluster 7 Zone 1B Division 26 29-Oct-2017 30-Oct-2017 8:40 AM 31-Oct-2017 B comments
Closed
Cluster 7

Installation of PVC conduits and GI boxes for mechanical equipment


Approved w/
110 KHEP-EL-0110 Control system at roof slab of Cluster 7 (for First Floor and Roof Floor Cluster 7 Zone 1B Division 26 29-Oct-2017 30-Oct-2017 9:00 AM 31-Oct-2017 B comments
Closed
Equipment) Zone 1B, Cluster 7

Installation of PVC conduits and GI boxes for mechanical equipment


Power system at roof slab of Cluster 7 (for First Floor and Roof Floor Approved w/
111 KHEP-EL-0111
ower Supply and Grounding) Zone 1B,
Cluster 7 Zone 1B Division 26 29-Oct-2017 30-Oct-2017 9:20 AM 31-Oct-2017 B comments
Closed
Cluster 7
Installation of 50mm PVC sleeves for grounding system at grade
Approved w/
112 KHEP-EL-0112 beam of Cluster 34 Zone 2B, Cluster 34 Zone 2B Division 26 29-Oct-2017 30-Oct-2017 9:50 AM 1-Nov-2017 B comments
Closed
Cluster 34
Installation of PVC conduits and GI boxes for Ground Floor Lighting
Approved w/
113 KHEP-EL-0113 System at First Floor slab of Cluster 8 Zone 1B, Cluster Cluster 8 Zone 1B Division 26 30-Oct-2017 31-Oct-2017 8:00 AM 4-Nov-2017 B comments
Closed
8
Installation of PVC conduit for Power Socket Outlet at First Floor of
Approved w/
114 KHEP-EL-0114 Cluster 8 Zone 1B, Cluster 8 Zone 1B Division 26 30-Oct-2017 31-Oct-2017 8:30 AM 4-Nov-2017 B comments
Closed
Cluster 8
Installation of PVC conduits and GI boxes for Ground Floor
mechanical equipment Control system at First Floor slab of Cluster 8 Approved w/
115 KHEP-EL-0115
Zone 1B,
Cluster 8 Zone 1B Division 26 30-Oct-2017 31-Oct-2017 9:00 AM 5-Nov-2017 B comments
Closed
Cluster 8
Installation of PVC conduits and GI boxes for Ground Floor
mechanical equipment Power system at First Floor slab of Cluster 8
116 KHEP-EL-0116
Zone 1B,
Cluster 8 Zone 1B Division 26 30-Oct-2017 31-Oct-2017 9:20 AM 5-Nov-2017 A Approved Closed
Cluster 8
Installation of PVC conduits for Main Feeder and Grounding at
Cluster 14 Ground Floor (32mm for Grounding and 4 inch for Main
117 KHEP-EL-0117
Feeder) Zone 1B,
Cluster 14 Zone 1B Division 26 30-Oct-2017 31-Oct-2017 10:00 AM 6-Nov-2017 E Rejected Closed
Cluster 14

Installation of Conrete - encase UPVC at Ground Floor in Cluster 14


Approved w/
117.1 KHEP-EL-0117-01 (32mm for Grounding and 4 inch for Main Feeder) Cluster 14 Zone 1B Division 26 5-Dec-2017 6-Dec-2017 9:00 AM 7-Dec-2017 B comments
Closed
Zone 1B, Cluster 14
Installation of PVC conduits for Main Feeder and Grounding at
Cluster 13 Ground Floor (32mm for Grounding and 4 inch for Main
118 KHEP-EL-0118
Feeder) Zone 1B,
Cluster 13 Zone 1B Division 26 30-Oct-2017 31-Oct-2017 10:20 AM 6-Nov-2017 E Rejected Closed
Cluster 14

Installation of Conrete - encase UPVC at Ground Floor in Cluster 13


Approved w/
118.1 KHEP-EL-0118-01 (32mm for Grounding and 4 inch for Main Feeder) Cluster 13 Zone 1B Division 26 5-Dec-2017 6-Dec-2017 10:00 AM 7-Dec-2017 B comments
Closed
Zone 1B, Cluster 13

Installation of 4" PVC conduit forMain Feeder at Ground Floor of


119 KHEP-EL-0119 Cluster 48 Zone Cluster 48 Zone 3B Division 26 30-Oct-2017 31-Oct-2017 11:00 AM 6-Nov-2017 E Rejected Closed
3B, Cluster 48
Installation of 50mm PVC sleeves for grounding system at grade
Approved w/
120 KHEP-EL-0120 beam of Cluster 63 Zone 3B, Cluster 63 Zone 3B Division 26 31-Oct-2017 1-Nov-2017 8:30 AM 1-Nov-2017 B comments
Closed
Cluster 63
Installation of PVC conduits and GI boxes for Ground Floor Lighting
Approved w/
121 KHEP-EL-0121 system at First Floor slab of Cluster 75 Cluster 75 Zone 4B Division 26 4-Nov-2017 5-Nov-2017 9:00 AM 7-Nov-2017 B comments
Closed
Zone 4B, Cluster 75
Installation of PVC conduit for Power Socket Outlet at First Floor of
Approved w/
122 KHEP-EL-0122 Cluster 75 Zone 4B, Cluster 75 Zone 4B Division 26 4-Nov-2017 5-Nov-2017 9:20 AM 7-Nov-2017 B comments
Closed
Cluster 75
Installation of PVC conduits and GI boxes for Ground Floor
mechanical equipment Control system at First Floor slab of Cluster 75 Approved w/
123 KHEP-EL-0123
Zone 4B,
Cluster 75 Zone 4B Division 26 4-Nov-2017 5-Nov-2017 9:40 AM 7-Nov-2017 B comments
Closed
Cluster 75
Installation of PVC conduits and GI boxes for Ground Floor
mechanical equipment Power system at First Floor slab of Cluster 75 Approved w/
124 KHEP-EL-0124
Zone 4B,
Cluster 75 Zone 4B Division 26 4-Nov-2017 5-Nov-2017 10:00 AM 6-Nov-2017 B comments
Closed
Cluster 75
Installation of PVC conduit for Power Socket Outlet at First Floor of
Approved w/
125 KHEP-EL-0125 Cluster 61 Zone 3B, Cluster 61 Zone 3B Division 26 9-Nov-2017 11-Sep-2017 8:40 AM 12-Nov-2017 B comments
Closed
Cluster 61
Installation of PVC conduits and GI boxes for Ground Floor
mechanical equipment Power system at First Floor slab of Cluster 61 Approved w/
126 KHEP-EL-0126
Zone 3B,
Cluster 61 Zone 3B Division 26 9-Nov-2017 11-Sep-2017 9:00 AM 12-Nov-2017 B comments
Closed
Cluster 61
Installation of PVC conduits and GI boxes for Ground Floor Lighting
Approved w/
127 KHEP-EL-0127 system at First Floor slab of Cluster 61 Cluster 61 Zone 3B Division 26 9-Nov-2017 11-Sep-2017 9:20 AM 12-Nov-2017 B comments
Closed
Zone 3B, Cluster 61
Installation of 50mm PVC sleeves for grounding system at grade
128 KHEP-EL-0128 beam of Cluster 64 Zone 3B, Cluster 64 Zone 3B Division 26 11-Nov-2017 12-Nov-2017 8:30 AM 14-Nov-2017 A Approved Closed
Cluster 64
Installation of PVC conduit for Power Socket Outlet at First Floor of
129 KHEP-EL-0129 Cluster 3 Zone 1A, Cluster 3 Zone 1A Division 26 12-Nov-2017 13-Nov-2017 8:00 AM 14-Nov-2017 A Approved Closed
Cluster 3
Installation of PVC conduits and GI boxes for Ground Floor
Mechanical Equipment power system at First Floor slab of Cluster 3 Approved w/
130 KHEP-EL-0130
Zone 1A,
Cluster 3 Zone 1A Division 26 12-Nov-2017 13-Nov-2017 8:20 AM 14-Nov-2017 B comments
Closed
Cluster 3
Installation of PVC conduits and GI boxes for Ground Floor Lighting
Approved w/
131 KHEP-EL-0131 system at First Floor slab of Cluster 3 Cluster 3 Zone 1A Division 26 12-Nov-2017 13-Nov-2017 8:40 AM 14-Nov-2017 B comments
Closed
Zone 1A, Cluster 3
Installation of PVC conduit for Power Socket Outlet at First Floor of
Approved w/
132 KHEP-EL-0132 Cluster 19 Zone 1B, Cluster 19 Zone 1B Division 26 14-Nov-2017 15-Nov-2017 9:00 AM 16-Nov-2017 B comments
Closed
Cluster 19
Installation of PVC conduits and GI boxes for Ground Floor
Mechanical Equipment power system at First Floor slab of Cluster 19 Approved w/
133 KHEP-EL-0133
Zone 1B,
Cluster 19 Zone 1B Division 26 14-Nov-2017 15-Nov-2017 9:20 AM 16-Nov-2017 B comments
Closed
Cluster 19
Installation of PVC conduits and GI boxes for Ground Floor Lighting
Approved w/
134 KHEP-EL-0134 system at First Floor slab of Cluster 19 Cluster 19 Zone 1B Division 26 14-Nov-2017 15-Nov-2017 9:40 AM 16-Nov-2017 B comments
Closed
Zone 1B, Cluster 19
Installation of PVC conduit for Power Socket Outlet at Ground Floor
Approved w/
135 KHEP-EL-0135 Room of Cluster 19 Unit B Cluster 69 Zone 4B Division 26 14-Nov-2017 15-Nov-2017 10:00 AM 18-Nov-2017 B comments
Closed
Zone 4B, Cluster 69
Installation of PVC conduits and Galvanized Steel box for Switch of
mechanical equipment at Ground Floor of Unit B Cluster 69(FCU
136 KHEP-EL-0136 Cluster 69 Zone 4B Division 26 14-Nov-2017 15-Nov-2017 1:50 PM RECALLED
Switch at Living Room and range Hood Switch at Kitchen)
Zone 4B, Cluster 69

Installation of PVC conduits and Galvanized Steel box for Power


Socket Oulet at Ground Floor and First Floor Level of Unit B Cluster
137 KHEP-EL-0137
69 Zone 4B, Cluster
Cluster 69 Zone 4B Division 27 14-Nov-2017 15-Nov-2017 2:00 PM 16-Nov-2017 E Rejected Closed
69

Installation of PVC conduits and Galvanized Steel box for Lighting


138 KHEP-EL-0138 Switch at Ground Floor and First Floor Level of Unit B Cluster 69 Cluster 69 Zone 4B Division 27 14-Nov-2017 15-Nov-2017 2:30 PM RECALLED
Zone 4B, Cluster 69

Installation of PVC conduits and GI boxes for Ground Floor


Mechanical Equipment power system at First Floor slab of Cluster 48 Approved w/
139 KHEP-EL-0139
Zone 3B,
Cluster 48 Zone 3B Division 26 18-Nov-2017 19-Nov-2017 9:00 AM 19-Nov-2017 B comments
Closed
Cluster 48
Installation of PVC conduits and GI boxes for Ground Floor Lighting
Approved w/
140 KHEP-EL-0140 system at First Floor slab of Cluster 48 Cluster 48 Zone 3B Division 26 18-Nov-2017 19-Nov-2017 9:20 AM 19-Nov-2017 B comments
Closed
Zone 3B, Cluster 48
Installation of PVC conduits and GI boxes for Ground Floor
Mechanical Equipment power system at First Floor slab of Cluster 16
141 KHEP-EL-0141
Zone 1B,
Cluster 16 Zone 1B Division 26 18-Nov-2017 19-Nov-2017 9:40 AM 20-Nov-2017 E Rejected Closed
Cluster 16
Installation of PVC conduit for Power Socket Outlet at First Floor of
142 KHEP-EL-0142 Cluster 16 Zone 1B, Cluster 16 Zone 1B Division 26 18-Nov-2017 19-Nov-2017 10:00 AM 20-Nov-2017 E Rejected Closed
Cluster 16
Installation of PVC conduits and GI boxes for Ground Floor Lighting
143 KHEP-EL-0143 system at First Floor slab of Cluster 16 Cluster 16 Zone 1B Division 26 18-Nov-2017 19-Nov-2017 10:20 AM RECALLED
Zone 1B, Cluster 16
Installation of PVC conduit for Power Socket Outlet at First Floor of
Approved w/
144 KHEP-EL-0144 Cluster 48 Zone 3B, Cluster 48 Zone 3B Division 26 19-Nov-2017 20-Nov-2017 8:00 AM 26-Nov-2017 B comments
Closed
Cluster 48
Installation of PVC conduit for Convenience Outlet at First Floor of
Approved w/
145 KHEP-EL-0145 Cluster 20 Zone Cluster 20 Zone 1B Division 26 23-Nov-2017 25-Nov-2017 10:00 AM 27-Nov-2017 B comments
Closed
1B, Cluster 20
Installation of PVC conduit for Lighting System at First Floor of
Approved w/
146 KHEP-EL-0146 Cluster 20 Cluster 20 Zone 1B Division 26 23-Nov-2017 25-Nov-2017 9:00 AM 27-Nov-2017 B comments
Closed
Zone 1B, Cluster 20
Installation of PVC conduit for Convenience Outlet & Disconnect
Approved w/
147 KHEP-EL-0147 Switch at Ground Floor of Cluster 69 Cluster 69 Zone 4B Division 26 25-Nov-2017 26-Nov-2017 9:00 AM 27-Nov-2017 B comments
Closed
Zone 4B, Cluster 69
Installation of 50mm PVC Conduit sleeves for grounding system at
Approved w/
148 KHEP-EL-0148 Ground Floor of Cluster 65 Zone Cluster 65 Zone 4A Division 26 25-Nov-2017 26-Nov-2017 1:00 PM 27-Nov-2017 B comments
Closed
4A , Cluster 65
Installation of PVC Conduit for Lighting System at Ground Floor of
Approved w/
149 KHEP-EL-0149 Cluster 71 Zone Cluster 71 Zone 4B Division 26 26-Nov-2017 27-Nov-2017 2:00 PM 28-Nov-2017 B comments
Closed
4B, Cluster 71
Installation of PVC Conduit for Mechanical Power System at Ground
150 KHEP-EL-0150 Floor of Cluster 71 Zone 4B, Cluster 71 Zone 4B Division 26 26-Nov-2017 27-Nov-2017 10:00 AM 28-Nov-2017 A Approved Closed
Cluster 71
Installation of PVC Conduit for Mechanical Power System at Ground
151 KHEP-EL-0151 Floor of Cluster 20 Zone 1B, Cluster 20 Zone 1B Division 26 26-Nov-2017 27-Nov-2017 9:00 AM 28-Nov-2017 A Approved Closed
Cluster 20
Installation of PVC Conduit for Power System at First Floor of Cluster
Approved w/
152 KHEP-EL-0152 71 Zone 4B, Cluster 71 Zone 4B Division 26 26-Nov-2017 27-Nov-2017 1:00 PM 28-Nov-2017 B comments
Closed
Cluster 71
Installation of PVC Conduit Block Out for Main Feeder incoming at
Approved w/
153 KHEP-EL-0153 Ground Floor of Cluster 21 Cluster 21 Zone 2B Division 26 27-Nov-2017 28-Nov-2017 9:00 AM 29-Nov-2017 B comments
Closed
Zone 2B, Cluster 21
Installation of PVC Conduit Sleeves for Grounding System at Ground
Approved w/
154 KHEP-EL-0154 Floor of Cluster 21 Cluster 21 Zone 2B Division 26 27-Nov-2017 28-Nov-2017 10:00 AM 30-Nov-2017 B comments
Closed
Zone 2B, Cluster 21
Installation of PVC Conduit for Mechanical Power System at Ground
Approved w/
155 KHEP-EL-0155 Floor of Cluster 16 Zone 1A, Cluster 16 Zone 1A Division 26 27-Nov-2017 28-Nov-2017 1:00 PM 30-Nov-2017 B comments
Closed
Cluster 16
Installation of PVC Conduit for Power System at First Floor of Cluster
Approved w/
156 KHEP-EL-0156 16 Zone 1A, Cluster 16 Zone 1A Division 26 27-Nov-2017 28-Nov-2017 9:00 AM 29-Nov-2017 B comments
Closed
Cluster 16
Installation of PVC Conduit & Boxes for Lighting System for Ground
Approved w/
157 KHEP-EL-0157 Floor & First Floor of Cluster 16 Cluster 16 Zone 1B Division 26 2-Dec-2017 3-Dec-2017 9:00 AM 5-Dec-2017 B comments
Closed
Zone 1B, Cluster 16, (BC4 Type)
Installation of PVC Conduit for Mechanical Power System for Ground
Approved w/
158 KHEP-EL-0158 Floor & First Floor of Cluster 6 Cluster 6 Zone 1B Division 26 2-Dec-2017 3-Dec-2017 9:30 AM 5-Dec-2017 B comments
Closed
Zone 1B, Cluster 6 (BC4 Type)
Installation of PVC Conduit for Power System at First Floor of Cluster
Approved w/
159 KHEP-EL-0159 6 Zone 1B, Cluster 6 Zone 1B Division 26 27-Nov-2017 28-Nov-2017 9:45 AM 29-Nov-2017 B comments
Closed
Cluster 6
Installation of PVC Conduit for Lighting System for Ground Floor &
Approved w/
160 KHEP-EL-0160 First Floor of Cluster 6 Cluster 6 Zone 1B Division 26 2-Dec-2017 3-Dec-2017 10:15 AM 5-Dec-2017 B comments
Closed
Zone 1A, Cluster 6 (BC4 Type)
Installation of PVC Conduit & Boxes for Lighting System for Ground
Approved w/
161 KHEP-EL-0161 Floor & First Floor of Cluster 4 Cluster 4 Zone 2A Division 26 30-Nov-2017 2-Dec-2017 9:00 AM 5-Dec-2017 B comments
Closed
Zone 2A, Cluster 4
Installation of PVC Conduit for Power System at First Floor of Cluster
Approved w/
162 KHEP-EL-0162 4 Zone 1A, Cluster 4 Zone 1A Division 26 30-Nov-2017 2-Dec-2017 9:15 AM 5-Dec-2017 B comments
Closed
Cluster 4
Installation of PVC Conduit for Mechanical Power System for Ground
Approved w/
163 KHEP-EL-0163 Floor & First Floor of Cluster 4 Cluster 4 Zone 1A Division 26 30-Nov-2017 2-Dec-2017 10:15 AM 5-Dec-2017 B comments
Closed
Zone 1A, Cluster 4
Installation of PVC Conduit for Mechanical Power System for Ground
Approved w/
164 KHEP-EL-0164 Floor & First Floor of Cluster 51 Cluster 51 Zone 3B Division 26 2-Dec-2017 3-Dec-2017 9:00 AM 5-Dec-2017 B comments
Closed
Zone 3B, Cluster 51
Installation of PVC Conduit for Power System at First Floor of Cluster
Approved w/
165 KHEP-EL-0165 51 Zone 3B, Cluster 51 Zone 3B Division 26 2-Dec-2017 3-Dec-2017 9:15 AM 4-Dec-2017 B comments
Closed
Cluster 51
Installation of PVC Conduit & Box for Lighting System at Ground
Approved w/
166 KHEP-EL-0166 Floor at First Floor Slab of Cluster 51 Cluster 51 Zone 3B Division 26 2-Dec-2017 3-Dec-2017 9:30 AM 5-Dec-2017 B comments
Closed
Zone 3B, Cluster 51
Installation of PVC Conduit for Mechanical Power System at Ground
167 KHEP-EL-0167 Floor of Cluster 27 Zone 2B, Cluster 27 Zone 2B Division 26 2-Dec-2017 3-Dec-2017 10:00 AM 4-Dec-2017 A Approved Closed
Cluster 27
Installation of PVC Conduit for Power System at First Floor of Cluster
Approved w/
168 KHEP-EL-0168 27 Zone 2B, Cluster 27 Zone 2B Division 26 2-Dec-2017 3-Dec-2017 10:15 AM 4-Dec-2017 B comments
Closed
Cluster 27
Installation of PVC Conduit & Box for Lighting System for Ground
Approved w/
169 KHEP-EL-0169 Floor & First Floor of Cluster 27 Cluster 27 Zone 2B Division 26 2-Dec-2017 3-Dec-2017 10:30 AM 5-Dec-2017 B comments
Closed
Zone 2B, Cluster 27
Installation of PVC Conduit for Mechanical Power System for First
Approved w/
170 KHEP-EL-0170 Floor (Roof Floor) of Cluster 8 Cluster 8 Zone 1B Division 26 2-Dec-2017 3-Dec-2017 1:00 PM 5-Dec-2017 B comments
Closed
Zone 1B, Cluster 8
Installation of PVC Conduit & Box for Lighting System for First Floor
Approved w/
171 KHEP-EL-0171 at Roof Slab in Cluster 8 Cluster 8 Zone 1B Division 26 2-Dec-2017 3-Dec-2017 1:15 PM 5-Dec-2017 B comments
Closed
Zone 1B, Cluster 8
Installation of PVC Conduit & Box for Lighting System at Roof top of
172 KHEP-EL-0172 Cluster 8 Zone Cluster 8 Zone 1B Division 26 2-Dec-2017 3-Dec-2017 1:30 PM 4-Dec-2017 A Approved Closed
1B, Cluster 8
Installation of PVC Conduit for Power System at Roof Top Cluster 8
173 KHEP-EL-0173 Zone 1B, Cluster 8 Zone 1B Division 26 2-Dec-2017 3-Dec-2017 1:45 PM 4-Dec-2017 A Approved Closed
Cluster 8
Installation of 50mm PVC Conduit sleeves for grounding system at
Approved w/
174 KHEP-EL-0174 Ground Floor of Cluster 30 Zone Cluster 30 Zone 2B Division 26 3-Dec-2017 4-Dec-2017 10:00 AM 6-Dec-2017 B comments
Closed
2B , Cluster 30
Installation of PVC Conduit for Mechanical Power System at slab on
Approved w/
175 KHEP-EL-0175 grid at Ground Floor of Cluster 15 Cluster 15 Zone 1B Division 26 3-Dec-2017 4-Dec-2017 9:15 AM 6-Dec-2017 B comments
Closed
Zone 1B, Cluster 15
Installation of PVC Conduit for Power System at Slab on Grid at
Approved w/
176 KHEP-EL-0176 Ground Floor in Cluster 15 Cluster 15 Zone 1B Division 26 3-Dec-2017 4-Dec-2017 10:15 AM 6-Dec-2017 B comments
Closed
Zone 1B, Cluster 15
Installation of Blackout foam for incoming conduits for panel board at
Approved w/
177 KHEP-EL-0177 Ground Floor cluster 30 Cluster 30 Zone 2B Division 26 3-Dec-2017 4-Dec-2017 9:15 AM 6-Dec-2017 B comments
Closed
Zone 2B, Cluster 30
Installation of Blackout foam for incoming conduits for panel board
Approved w/
178 KHEP-EL-0178 under grade beam cluster 18 Cluster 18 B2 Zone 1B, Division 26 3-Dec-2017 4-Dec-2017 9:15 AM 5-Dec-2017 B comments
Closed
Zone 1B, Cluster 18, BC4
Installation of PVC Sleeves for Grounding System under Grade Beam
Approved w/
179 KHEP-EL-0179 of Cluster 18 Cluster 18 B2 Zone 1B, Division 26 3-Dec-2017 4-Dec-2017 9:30 AM 5-Dec-2017 B comments
Closed
Zone 1B, Cluster 18, BC4
Installation of PVC Conduit & Box for Lighting System for Ground
Approved w/
180 KHEP-EL-0180 floor at First Floor slab of Cluster 73 Cluster 73 Zone 4B Division 26 12-Dec-2017 13-Dec-2017 9:30 AM 13-Dec-2017 B comments
Closed
Zone 4B, Cluster 73
Installation of PVC Conduit for Mechanical Power System for Ground
Approved w/
181 KHEP-EL-0181 Floor at first floor slab of Cluster 73 Cluster 73 Zone 4B Division 26 7-Dec-2017 9-Dec-2017 9:00 AM 11-Dec-2017 B comments
Closed
Zone 4B, Cluster 73
Installation of Conrete - encase UPVC & PVC at Ground Floor in
Cluster 12 (32mm for Grounding and 4 inch for Main Feeder) Approved w/
182 KHEP-EL-0182
Zone 1B, Cluster
Cluster 12 Zone 1B Division 26 5-Dec-2017 6-Dec-2017 2:00 PM 7-Dec-2017 B comments
Closed
12
Installation of Conrete - encase UPVC & PVC at Ground Floor in
Cluster 10 (32mm for Grounding and 4 inch for Main Feeder) Approved w/
183 KHEP-EL-0183
Zone 1B, Cluster
Cluster 10 Zone 1B Division 26 5-Dec-2017 6-Dec-2017 9:30 AM 7-Dec-2017 B comments
Closed
10
Installation of Conrete - encase UPVC & PVC at Ground Floor in
Cluster 11 (32mm for Grounding and 4 inch for Main Feeder) Approved w/
184 KHEP-EL-0184
Zone 1B,
Cluster 11 Zone 1B Division 26 5-Dec-2017 6-Dec-2017 9:45 AM 7-Dec-2017 B comments
Closed
Cluster 11
Installation of Conrete - encase UPVC & PVC at Ground Floor in
Cluster 5 (32mm for Grounding and 4 inch for Main Feeder) Approved w/
185 KHEP-EL-0185
Zone 1B, Cluster
Cluster 5 Zone 1B Division 26 5-Dec-2017 6-Dec-2017 10:15 AM 7-Dec-2017 B comments
Closed
5
Installation of PVC Conduit for Power System at First Floor slab in
Approved w/
186 KHEP-EL-0186 Cluster 73 Cluster 73 Zone 4B Division 26 7-Dec-2017 9-Dec-2017 9:00 AM 11-Dec-2017 B comments
Closed
Zone 4B, Cluster 73
Installation of PVC Conduit for Power System at First Floor slab in
187 KHEP-EL-0187 Cluster 33 Cluster 33 Zone 2B Division 26 5-Dec-2017 6-Dec-2017 1:15 PM 7-Dec-2017 A Approved Closed
Zone 2B, Cluster 33
Installation of PVC Conduit & Boxes for Lighting System at Ground
Approved w/
188 KHEP-EL-0188 floor at First Floor Slab in Cluster 33 Cluster 33 Zone 2B Division 26 5-Dec-2017 6-Dec-2017 1:30 PM 7-Dec-2017 B comments
Closed
Zone 2B, Cluster 33
Installation of Mechanical Power System PVC conduits for Ground
189 KHEP-EL-0189 Floor at First Floor slab in Cluster 33 Cluster 33 Zone 2B Division 26 5-Dec-2017 6-Dec-2017 1:35 PM 7-Dec-2017 A Approved Closed
Zone 2B, Cluster 33
Installation of PVC Sleeves for Grounding System at Grade Beam of
Approved w/
190 KHEP-EL-0190 Cluster 23 Cluster 23 Zone 1B Division 26 5-Dec-2017 6-Dec-2017 8:00 AM 7-Dec-2017 B comments
Closed
Zone 1B, Cluster 23
Installation of black out foam for main Panel board at Grade Beam in
Approved w/
191 KHEP-EL-0191 Cluster 23 Cluster 23 Zone 1B Division 26 5-Dec-2017 6-Dec-2017 8:15 AM 7-Dec-2017 B comments
Closed
Zone 1B, Cluster 23
Installation of black out foam for main Panel board at Grid Beam in
Approved w/
192 KHEP-EL-0192 Cluster 60 Cluster 60 Zone 3B Division 26 5-Dec-2017 6-Dec-2017 1:15 PM 7-Dec-2017 B comments
Closed
Zone 3B, Cluster 60
Installation of PVC Sleeves for Ground System at Grid Beam of
Approved w/
193 KHEP-EL-0193 Cluster 60 Cluster 60 Zone 3B Division 26 5-Dec-2017 6-Dec-2017 1:30 PM 7-Dec-2017 B comments
Closed
Zone 3B, Cluster 60
Installation of 50mm PVC Sleeves for Ground System at Grid Beam of
194 KHEP-EL-0194 Cluster 50 Cluster 50 Zone 3B Division 26 6-Dec-2017 7-Dec-2017 8:30 AM 9-Dec-2017 A Approved Closed
Zone 3B, Cluster 50
Installation of black out foam for main Panel board at Grid Beam in
Approved w/
195 KHEP-EL-0195 Cluster 50 Cluster 50 Zone 3B Division 26 6-Dec-2017 7-Dec-2017 9:00 AM 9-Dec-2017 B comments
Closed
Zone 3B, Cluster 50

Installation of Concrete - encase UPVC & PVC at Ground Floor in


Approved w/
196 KHEP-EL-0196 Cluster 7 (32mm for Grounding and 4 inch for Main Feeder) Cluster 7 Zone 1B Division 26 6-Dec-2017 7-Dec-2017 10:15 AM 7-Dec-2017 B comments
Closed
Zone 1B, Cluster 7

Installation of PVC Conduit & Box for Lighting System in Ground floor
Approved w/
197 KHEP-EL-0197 at First Floor Slab in Cluster 9 Cluster 9 Zone 1B Division 26 12-Dec-2017 13-Dec-2017 9:00 AM 13-Dec-2017 B comments
Closed
Zone 1B, Cluster 9
Installation of PVC Conduit for Power System in First Floor slab in
Approved w/
198 KHEP-EL-0198 Cluster 9 Cluster 9 Zone 1B Division 26 12-Dec-2017 13-Dec-2017 9:15 AM 13-Dec-2017 B comments
Closed
Zone 1B, Cluster 9
Installation of PVC Conduit for Mechanical Power System in Ground
Approved w/
199 KHEP-EL-0199 Floor at First floor slab of Cluster 9 Cluster 9 Zone 1B Division 26 12-Dec-2017 13-Dec-2017 10:00 AM 13-Dec-2017 B comments
Closed
Zone 1B, Cluster 9
Installation of PVC Conduit for Mechanical Power System in Ground
Approved w/
200 KHEP-EL-0200 Floor at First floor slab of Cluster 52 Cluster 52 Zone 3B Division 26 7-Dec-2017 9-Dec-2017 1:15 PM 9-Dec-2017 B comments
Closed
Zone 3B, Cluster 52
Installation of PVC Conduit & Box for Lighting System at Ground floor
Approved w/
201 KHEP-EL-0201 at First Floor Slab in Cluster 52 Cluster 52 Zone 3B Division 26 7-Dec-2017 9-Dec-2017 1:30 PM 9-Dec-2017 B comments
Closed
Zone 3B, Cluster 52
Installation of PVC Conduit for Power System at First Floor slab
Approved w/
202 KHEP-EL-0202 Cluster 52 Cluster 52 Zone 3B Division 26 7-Dec-2017 9-Dec-2017 2:00 PM 9-Dec-2017 B comments
Closed
Zone 3B, Cluster 52
Installation of PVC Conduit for Power System in Ground Floor slab
Approved w/
203 KHEP-EL-0203 Cluster 1 Cluster 01 Zone 1A Division 26 10-Dec-2017 11-Dec-2017 1:00 PM 13-Dec-2017 B comments
Closed
Zone 1A, Cluster 1
Installation of PVC Conduit for Mechanical Power System in Ground
Approved w/
204 KHEP-EL-0204 Floor slab of Cluster 1 (For Pumps & Water Heater) Cluster 01 Zone 1A Division 26 10-Dec-2017 11-Dec-2017 1:15 PM 13-Dec-2017 B comments
Closed
Zone 1A, Cluster 1
Installation of PVC Conduit for Mechanical Power System for Ground
205 KHEP-EL-0205 Floor at First Floor slab of Cluster 58 Cluster 58 Zone 3B Division 26 12-Dec-2017 13-Dec-2017 8:15 AM 16-Dec-2017 A Approved Closed
Zone 3B, Cluster 58
Installation of PVC Conduit for Power System in First Floor slab
206 KHEP-EL-0206 Cluster 58 Cluster 58 Zone 3B Division 26 12-Dec-2017 13-Dec-2017 8:30 AM 16-Dec-2017 A Approved Closed
Zone 3B, Cluster 58
Installation of PVC Conduit & Box for Lighting System at Ground floor
Approved w/
207 KHEP-EL-0207 at First Floor Slab in Cluster 58 Cluster 58 Zone 3B Division 26 12-Dec-2017 13-Dec-2017 9:30 AM 16-Dec-2017 B comments
Closed
Zone 3B, Cluster 58
Installation of PVC Conduit for Mechanical Power System in First
208 KHEP-EL-0208 Floor at Roof slab of Cluster 19 Cluster 19 Zone 1B Division 26 14-Dec-2017 16-Dec-2017 8:30 AM 17-Dec-2017 A Approved Closed
Zone 1B, Cluster 19
Installation of PVC Conduit for Mechanical Power System in Roof
209 KHEP-EL-0209 Floor at Roof slab of Cluster 19 Cluster 19 Zone 1B Division 26 14-Dec-2017 16-Dec-2017 9:00 AM 17-Dec-2017 A Approved Closed
Zone 1B, Cluster 19
Installation of PVC Conduit & Box for Lighting System at First floor at
210 KHEP-EL-0210 Roof Slab in Cluster 19 Cluster 19 Zone 1B Division 26 14-Dec-2017 16-Dec-2017 9:30 AM 17-Dec-2017 A Approved Closed
Zone 1B, Cluster 19
Installation of PVC Conduit & Box for Lighting System at Roof floor at
211 KHEP-EL-0211 Roof Slab in Cluster 19 Cluster 19 Zone 1B Division 26 14-Dec-2017 16-Dec-2017 10:00 AM 17-Dec-2017 A Approved Closed
Zone 1B, Cluster 19
Installation of PVC Conduit for Power System in Roof Floor at Roof
212 KHEP-EL-0212 slab Cluster 19 Cluster 19 Zone 1B Division 26 14-Dec-2017 16-Dec-2017 1:30 PM 17-Dec-2017 A Approved Closed
Zone 1B, Cluster 19
Installation of PVC Conduit & Box for Lighting System at First floor at
Approved w/
213 KHEP-EL-0213 Roof Slab in Cluster 75 Cluster 75 Zone 4B Division 26 16-Dec-2017 17-Dec-2017 8:30 AM 18-Dec-2017 B comments
Closed
Zone 4B, Cluster 75
Installation of PVC Conduit & Box for Lighting System at Roof floor at
214 KHEP-EL-0214 Roof Slab in Cluster 75 Cluster 75 Zone 4B Division 26 16-Dec-2017 17-Dec-2017 9:30 AM 18-Dec-2017 A Approved Closed
Zone 4B, Cluster 75
Installation of PVC Conduit for Mechanical Power System in First
215 KHEP-EL-0215 Floor at Roof slab of Cluster 75 Cluster 75 Zone 4B Division 26 16-Dec-2017 17-Dec-2017 10:30 AM 18-Dec-2017 A Approved Closed
Zone 4B, Cluster 75
Installation of PVC Conduit for Mechanical Power System in Roof
Approved w/
216 KHEP-EL-0216 Floor at Roof slab of Cluster 75 Cluster 75 Zone 4B Division 26 16-Dec-2017 17-Dec-2017 1:30 PM 18-Dec-2017 B comments
Closed
Zone 4B, Cluster 75
Installation of PVC Conduit for Power System in Roof Floor at Roof
217 KHEP-EL-0217 slab Cluster 75 Cluster 75 Zone 4B Division 26 16-Dec-2017 17-Dec-2017 1:45 PM 18-Dec-2017 A Approved Closed
Zone 4B, Cluster 75
Installation of 50mm PVC sleeves for grounding system at Ground
Approved w/
218 KHEP-EL-0218 Floor at Grid Beam in Cluster 22 Cluster 22 Zone 1B Division 26 16-Dec-2017 17-Dec-2017 1:50 PM 18-Dec-2017 B comments
Closed
Zone 1B , Cluster 22
Installation of black out foam for main Panel board Power System
Approved w/
219 KHEP-EL-0219 For Ground Floor at Grid Beam in Cluster 22 Cluster 22 Zone 1B Division 26 16-Dec-2017 17-Dec-2017 2:00 PM 18-Dec-2017 B comments
Closed
Zone 1B, Cluster 22
Installation of PVC Conduit for Power System for ground Floor at
Approved w/
220 KHEP-EL-0220 ground floor slab Cluster 1 Cluster 01 Zone 1A Division 26 17-Dec-2017 18-Dec-2017 8:30 AM 23-Dec-2017 B comments
Closed
Zone 1A, Cluster 1
Installation of PVC Conduit for Mechanical Power System for ground
221 KHEP-EL-0221 Floor at ground floor slab of Cluster 1 Cluster 01 Zone 1A Division 26 17-Dec-2017 18-Dec-2017 9:30 AM 20-Nov-2017 E Rejected Closed
Zone 1A, Cluster 1

Installation of PVC Conduit for Mechanical Power System for ground Approved w/
221.1 KHEP-EL-0221-01
Floor at ground floor slab of Cluster 1 - Zone 1A, Cluster 1
Cluster 01 Zone 1A Division 26 21-Dec-2017 23-Dec-2017 9:30 AM 26-Dec-2017 B comments
Closed

Installation of PVC Conduit and outlet box for convenience outlet for
222 KHEP-EL-0222 first floor at wall in Cluster 69 Zone 4B, Cluster 69 Zone 4B Division 26 18-Dec-2017 19-Dec-2017 9:00 AM 21-Dec-2017 E Rejected Closed
Cluster 69
Installation of EMT Conduit and outlet box for convenience outlet for
Approved w/
222.1 KHEP-EL-0222-01 first floor at wall in Cluster 69 Zone 4B, Cluster 69 Zone 4B Division 26 26-Dec-2017 27-Dec-2017 8:30 AM 28-Dec-2017 B comments
Closed
Cluster 69
Installation of PVC Conduit and outlet box for lighting switch for first
223 KHEP-EL-0223 floor at wall in Cluster 69 Zone 4B, Cluster 69 Zone 4B Division 26 18-Dec-2017 19-Dec-2017 9:30 AM 21-Dec-2017 E Rejected Closed
Cluster 69
Installation of EMT Conduit and outlet box for lighting switch for first
Approved w/
223.1 KHEP-EL-0223-01 floor at wall in Cluster 69 Zone 4B, Cluster 69 Zone 4B Division 26 26-Dec-2017 27-Dec-2017 9:30 AM 30-Dec-2017 B comments
Closed
Cluster 69
Installation of PVC Conduit & Box for Lighting System first floor at
Approved w/
224 KHEP-EL-0224 Roof Slab in Cluster 61 Cluster 61 Zone 3B Division 26 19-Dec-2017 20-Dec-2017 8:30 AM 23-Dec-2017 B comments
Closed
Zone 3B, Cluster 61
Installation of PVC Conduit for Mechanical Power System for first
225 KHEP-EL-0225 floor at roof slab in Cluster 61 Cluster 61 Zone 3B Division 26 19-Dec-2017 20-Dec-2017 8:45 AM 21-Dec-2017 A Approved Closed
Zone 3B, Cluster 61
Installation of PVC Conduit for Power System for Roof Floor at Roof
226 KHEP-EL-0226 slab Cluster 61 Cluster 61 Zone 3B Division 26 19-Dec-2017 20-Dec-2017 9:00 AM 21-Dec-2017 A Approved Closed
Zone 3B, Cluster 61
Installation of PVC Conduit for Mechanical Power System for roof
Approved w/
227 KHEP-EL-0227 floor at roof slab in Cluster 61 Cluster 61 Zone 3B Division 26 19-Dec-2017 20-Dec-2017 9:15 AM 21-Dec-2017 B comments
Closed
Zone 3B, Cluster 61
Installation of PVC Conduit & box for lighting System for roof floor at
Approved w/
228 KHEP-EL-0228 roof slab in Cluster 61 Zone 3B, Cluster 61 Zone 3B Division 26 19-Dec-2017 20-Dec-2017 10:15 AM 23-Dec-2017 B comments
Closed
Cluster 61
Installation of PVC Conduit & box for lighting System for first floor at Approved w/
229 KHEP-EL-0229
roof slab in Cluster 20 Zone 1B, Cluster 20
Cluster 20 Zone 1B Division 26 24-Dec-2017 25-Dec-2017 8:15 AM 27-Dec-2017 B comments
Closed

Installation of PVC Conduit & box for lighting System for roof floor at Approved w/
230 KHEP-EL-0230
roof slab in Cluster 20 Zone 1B, Cluster 20
Cluster 20 Zone 1B Division 26 24-Dec-2017 25-Dec-2017 8:30 AM 30-Dec-2017 B comments
Closed

Installation of PVC Conduit for Power System for Roof Floor at Roof
231 KHEP-EL-0231
slab Cluster 20 Zone 1B Cluster 20
Cluster 20 Zone 1B Division 26 24-Dec-2017 25-Dec-2017 8:45 AM 27-Dec-2017 A Approved Closed

Installation of PVC Conduit for Mechanical Power System for roof


232 KHEP-EL-0232
floor at roof slab in Cluster 20 Zone 1B Cluster 20
Cluster 20 Zone 1B Division 26 24-Dec-2017 25-Dec-2017 9:45 AM 27-Dec-2017 A Approved Closed

Installation of PVC Conduit for Mechanical Power System for first


233 KHEP-EL-0233
floor at roof slab in Cluster 20 Zone 1B Cluster 20
Cluster 20 Zone 1B Division 26 24-Dec-2017 25-Dec-2017 10:45 AM 27-Dec-2017 A Approved Closed

Installation of PVC Conduit for Mechanical Power System for Ground


234 KHEP-EL-0234
floor at first floor slab in Cluster 34 Zone 2B
Cluster 34 Zone 2B Division 26 25-Dec-2017 26-Dec-2017 8:30 AM 27-Dec-2017 A Approved Closed

Installation of PVC Conduit for Power System for First Floor at First
235 KHEP-EL-0235
Floor slab Cluster 34 Zone 2B
Cluster 34 Zone 2B Division 26 25-Dec-2017 26-Dec-2017 9:30 AM 27-Dec-2017 A Approved Closed

Installation of PVC Conduit & box for lighting System for Ground floor
236 KHEP-EL-0236
at First Floor slab in Cluster 34 Zone 2B
Cluster 34 Zone 2B Division 26 25-Dec-2017 26-Dec-2017 10:30 AM 28-Dec-2017 A Approved Closed

Installation of EMT Conduit box for Single Switch for Fan Control Unit Approved w/
237 KHEP-EL-0237
for First Floor at wall in Cluster 69 Zone 4B
Cluster 69 Zone 4B Division 26 26-Dec-2017 27-Dec-2017 8:45 AM 30-Dec-2017 B comments
Closed

Installation of EMT Conduit box for Light Switch for Ground floor at Approved w/
238 KHEP-EL-0238
wall in Cluster 69 Zone 4B
Cluster 69 Zone 4B Division 26 26-Dec-2017 27-Dec-2017 8:45 AM 30-Dec-2017 B comments
Closed

Installation of PVC Conduit for Mechanical Power System for Roof


239 KHEP-EL-0239
floor at roof floor slab in Cluster 3 Zone 1A
Cluster 3 Zone 1A Division 26 27-Dec-2017 28-Dec-2017 8:00 AM 30-Dec-2017 A Approved Closed

Installation of PVC Conduit for Power System for Roof Floor at Roof
240 KHEP-EL-0240
slab Cluster 3 Zone 1A
Cluster 3 Zone 1A Division 26 27-Dec-2017 28-Dec-2017 8:30 AM 30-Dec-2017 A Approved Closed

Installation of PVC Conduit & box for lighting System for roof floor at Approved w/
241 KHEP-EL-0241
roof slab in Cluster 3 Zone 1A
Cluster 3 Zone 1A Division 26 27-Dec-2017 28-Dec-2017 8:45 AM 1-Jan-2018 B comments
Closed

Installation of PVC Conduit & box for lighting System for first floor at Approved w/
242 KHEP-EL-0242
roof slab in Cluster 3 Zone 1A
Cluster 3 Zone 1A Division 26 27-Dec-2017 28-Dec-2017 9:00 AM 1-Jan-2018 B comments
Closed

Installation of PVC Conduit for Mechanical Power System for First


243 KHEP-EL-0243
floor at roof floor slab in Cluster 3 Zone 1A
Cluster 3 Zone 1A Division 26 27-Dec-2017 28-Dec-2017 9:15 AM 30-Dec-2017 A Approved Closed
Installation of 50mm PVC Sleeves for Grounding System for ground Approved w/
244 KHEP-EL-0244
Floor at grade beam Zone 2B Cluster 37
Cluster 37 Zone 2B Division 26 27-Dec-2017 28-Dec-2017 9:15 AM 30-Dec-2017 B comments
Closed

Installation of Blackouts foam at grade beam for PVC Conduits


Approved w/
245 KHEP-EL-0245 Installation for Main Panelboard for Ground Floor in Cluster 37 Zone Cluster 37 Zone 2B Division 26 27-Dec-2017 28-Dec-2017 10:15 AM 30-Dec-2017 B comments
Closed
2B
Installation of PVC Conduit for Mechanical Power System for Ground Approved w/
246 KHEP-EL-0246
floor at First floor slab in Cluster 35 Zone 2B
Cluster 35 Zone 2B Division 26 28-Dec-2017 30-Dec-2017 8:30 AM 2-Jan-2018 B comments
Closed

Installation of PVC Conduit & box for lighting System for Ground floor Approved w/
247 KHEP-EL-0247
at First Floor slab in Cluster 35 Zone 2B
Cluster 35 Zone 2B Division 26 28-Dec-2017 30-Dec-2017 8:45 AM 2-Jan-2018 B comments
Closed

Installation of PVC Conduit for Power System for First Floor at First Approved w/
248 KHEP-EL-0248
Floor slab Cluster 35 Zone 2B
Cluster 35 Zone 2B Division 26 28-Dec-2017 30-Dec-2017 9:30 AM 2-Jan-2018 B comments
Closed

Installation of 50mm PVC Sleeves for Grounding System for ground


249 KHEP-EL-0249
Floor at grade beam Zone 2B Cluster 24
Cluster 24 Zone 2B Division 26 30-Dec-2017 31-Dec-2017 8:00 AM 1-Jan-2018 A Approved Closed

Installation of blackout foam for PVC Conduit Installation at Grade Approved w/


250 KHEP-EL-0250
Beam Ground Floor for Main Panel Board in Cluster 24
Cluster 24 Zone 2B Division 26 30-Dec-2017 31-Dec-2017 8:30 AM 1-Jan-2018 B comments
Closed

Installation of PVC Conduit & box for lighting System for first floor at Approved w/
251 KHEP-EL-0251
roof slab in Cluster 48
Cluster 48 Zone 3B Division 26 30-Dec-2017 31-Dec-2017 8:00 AM 2-Jan-2018 B comments
Closed

Installation of PVC Conduit & box for lighting System for Roof floor at Approved w/
252 KHEP-EL-0252
roof slab in Cluster 48
Cluster 48 Zone 3B Division 26 30-Dec-2017 31-Dec-2017 8:20 AM 2-Jan-2018 B comments
Closed

Installation of PVC Conduit for Mechanical Power System for First


253 KHEP-EL-0253
Floor at Roof slab in Cluster 48 Zone 3B
Cluster 48 Zone 3B Division 26 30-Dec-2017 31-Dec-2017 8:20 AM 1-Jan-2018 A Approved Closed

Installation of PVC Conduit for Mechanical Power System for Roof Approved w/
254 KHEP-EL-0254
Floor at Roof slab in Cluster 48 Zone 3B
Cluster 48 Zone 3B Division 26 30-Dec-2017 31-Dec-2017 8:30 AM 2-Jan-2018 B comments
Closed

Installation of PVC Conduit for Power System for Roof Floor at Roof
255 KHEP-EL-0255
slab Cluster 48 Zone 3B
Cluster 48 Zone 3B Division 26 30-Dec-2017 31-Dec-2017 9:30 AM 1-Jan-2018 A Approved Closed

Installation of PVC Conduit & box for lighting System for Ground floor Approved w/
256 KHEP-EL-0256
at First Floor slab in Cluster 81
Cluster 81 Zone 4A Division 26 30-Dec-2017 31-Dec-2017 1:00 PM 2-Jan-2018 B comments
Closed

Installation of PVC Conduit for Power System for First Floor at First
257 KHEP-EL-0257
Floor slab Cluster 81 Zone 4A
Cluster 81 Zone 4A Division 26 30-Dec-2017 31-Dec-2017 1:20 PM 1-Jan-2018 A Approved Closed

Installation of PVC Conduit for Mechanical Power System for Ground Approved w/
258 KHEP-EL-0258
Floor at First Floor slab in Cluster 81 Zone 4A
Cluster 81 Zone 4A Division 26 30-Dec-2017 31-Dec-2017 1:20 PM 2-Jan-2018 B comments
Closed

Installation of PVC Conduit for Mechanical Power System for Ground Approved w/
259 KHEP-EL-0259
Floor at Ground Floor slab Cluster 2 Zone 1A
Cluster 02 Zone 1A Division 26 30-Dec-2017 31-Dec-2017 8:30 AM 2-Jan-2018 B comments
Closed

Installation of PVC Conduit for Power System for Roof Floor at Roof Approved w/
260 KHEP-EL-0260
slab Cluster 2 Zone 1A
Cluster 02 Zone 1A Division 26 30-Dec-2017 31-Dec-2017 9:30 AM 2-Jan-2018 B comments
Closed

Installation of 50mm PVC Sleeves for Grounding System for ground


261 KHEP-EL-0261
Floor at ground Floor grade beam Zone 3B Cluster 55
Cluster 55 Zone 3B Division 26 1-Jan-2018 2-Jan-2018 8:00 AM 3-Jan-2018 A Approved Closed

Installation of blackout foam for PVC Conduit Installation Panel Board Approved w/
262 KHEP-EL-0262
for Ground Floor at Grade Beam in Cluster 55
Cluster 55 Zone 3B Division 26 1-Jan-2018 2-Jan-2018 8:20 AM 3-Jan-2018 B comments
Closed

Installation of EMT Conduit box for FCU's Single Switch for First floor
263 KHEP-EL-0263
at wall in Cluster 69 Zone 4B
Cluster 69 Zone 4B Division 26 1-Jan-2018 2-Jan-2018 8:20 AM 6-Jan-2018 A Approved Closed

Installation of EMT Conduit box for Lighting Switch for First floor at
264 KHEP-EL-0264 Cluster 69 Zone 4B Division 26 1-Jan-2018 2-Jan-2018 8:00 AM RECALLED
wall in Cluster 69 Zone 4B
Installation of EMT Conduit & Outlet Box for Convenience Outlet for Approved w/
265 KHEP-EL-0265
First at wall in Cluster 69 Zone 4B
Cluster 69 Zone 4B Division 26 2-Jan-2018 3-Jan-2018 8:45 AM 3-Jan-2018 B comments
Closed

Installation of EMT Conduit & Box at Ceiling Portion for Lighting


266 KHEP-EL-0266
Switch for First Floor in Cluster 69 Zone 4B
Cluster 69 Zone 4B Division 26 2-Jan-2018 3-Jan-2018 8:00 AM 6-Jan-2018 A Approved Closed

Installation of EMT Conduit & Outlet Box for Exhaust Fan & Timer
267 KHEP-EL-0267
Switch at Ceiling & wall Portion Cluster 69 Zone 4B
Cluster 69 Zone 4B Division 26 2-Jan-2018 3-Jan-2018 8:30 AM 6-Jan-2018 A Approved Closed

Installation of PVC Conduit for Mechanical Power System for Ground Approved w/
268 KHEP-EL-0268
Floor at Ground Floor slab Cluster 2 Zone 1A Villa 344
Cluster 02 Zone 1A Division 26 3-Jan-2018 4-Jan-2018 8:00 AM 7-Jan-2018 B comments
Closed

Installation of PVC Conduit for Power System for Ground Floor at Cluster 02 Approved w/
269 KHEP-EL-0269
Ground Floor slab Cluster 2 Zone 1A Villa 3&4 Villa 3, Villa 4
Zone 1A Division 26 3-Jan-2018 4-Jan-2018 8:30 AM 7-Jan-2018 B comments
Closed

Installation of PVC Conduit for Mechanical Power System for Ground Cluster 02 Approved w/
270 KHEP-EL-0270
Floor at Ground Floor slab Cluster 2 Zone 1A Villa 1&2 Villa 1, Villa 2
Zone 1A Division 26 3-Jan-2018 4-Jan-2018 1:00 PM 6-Jan-2018 B comments
Closed

Installation of PVC Conduit for Power System for Ground Floor at Cluster 02 Approved w/
271 KHEP-EL-0271
Ground Floor slab Cluster 2 Zone 1A Villa 142 Villa 1, Villa 2
Zone 1A Division 26 3-Jan-2018 4-Jan-2018 1:30 PM 6-Jan-2018 B comments
Closed

Installation of 50mm PVC Sleeves for Grounding system for ground Approved w/
272 KHEP-EL-0272
floor at ground floor grade beam in Cluster 25 Zone 2B Cluster 25
Cluster 25 Zone 2B Division 26 4-Jan-2018 6-Jan-2018 8:00 AM 8-Jan-2018 B comments
Closed

Installation of Black out foam for PVC Conduit Installation for


Approved w/
273 KHEP-EL-0273 Panelboard at Ground floor Grade beam in Cluster 25 Zone 2B Cluster 25 Zone 2B Division 26 4-Jan-2018 6-Jan-2018 8:30 AM 8-Jan-2018 B comments
Closed
Cluster 25
Installation of Blackout Foam for PVC Conduit Installation for Panel Approved w/
274 KHEP-EL-0274
Board at Ground Floor Grade Beam in Cluster 36 Zone 2B Cluster 36
Cluster 36 Zone 2B Division 26 6-Jan-2018 7-Jan-2018 8:00 AM 8-Jan-2018 B comments
Closed

Installation of 50mm Sleeves for Grounding System at Ground Floor Approved w/


275 KHEP-EL-0275
Grade Beam in Cluster 36 Zone 2B Cluster 36
Cluster 36 Zone 2B Division 26 6-Jan-2018 7-Jan-2018 8:30 AM 10-Jan-2018 B comments
Closed

Installation of PVC Conduit for Power System for Roof Floor at Roof
276 KHEP-EL-0276
slab Cluster 51 Zone 3B
Cluster 51 Zone 3B Division 26 7-Jan-2018 8-Jan-2018 8:00 AM 9-Jan-2018 A Approved Closed

Installation of PVC Conduit for Mechanical Power System for Roof Approved w/
277 KHEP-EL-0277
Floor at Roof slab Cluster 51 Zone 3B
Cluster 51 Zone 3B Division 26 7-Jan-2018 8-Jan-2018 8:20 AM 9-Jan-2018 B comments
Closed

Installation of PVC Conduits & box for lighting System for Roof floor Approved w/
278 KHEP-EL-0278
at Roof slab in Cluster 51 Zone 3B
Cluster 51 Zone 3B Division 26 7-Jan-2018 8-Jan-2018 8:30 AM 10-Jan-2018 B comments
Closed

Installation of PVC Conduits & box for lighting System for First floor Approved w/
279 KHEP-EL-0279
at First Floor slab in Cluster 51 Zone 3B
Cluster 51 Zone 3B Division 26 7-Jan-2018 8-Jan-2018 8:40 AM 10-Jan-2018 B comments
Closed

Installation of PVC Conduit for Mechanical Power System for First


280 KHEP-EL-0280
Floor at First Floor slab Cluster 51 Zone 3B
Cluster 51 Zone 3B Division 26 7-Jan-2018 8-Jan-2018 9:00 AM 9-Jan-2018 A Approved Closed

Installation of EMT conduits & outlets box for FCU switch for ground
281 KHEP-EL-0281
floor in Cluster 69 Zone 4B
Cluster 69 Zone 4B Division 26 8-Jan-2018 9-Jan-2018 9:00 AM 10-Jan-2018 A Approved Closed

Installation of EMT conduits & outlets box for Lighting switch for
Approved w/
282 KHEP-EL-0282 ground floor in Cluster 69 Zone 4B exluding garage telecom room & Cluster 69 Zone 4B Division 26 8-Jan-2018 9-Jan-2018 9:10 AM 10-Jan-2018 B comments
Closed
lighting switch at door intrance

Installation of EMT conduits & outlets box for power system for Approved w/
283 KHEP-EL-0283
ground floor in Cluster 69 Zone 4B Excluding garage & telecom room
Cluster 69 Zone 4B Division 26 8-Jan-2018 9-Jan-2018 9:20 AM 10-Jan-2018 B comments
Closed

Installation of PVC Conduit for Mechanical Power System for Roof Approved w/
284 KHEP-EL-0284
Floor at Roof slab Cluster 27 Zone 2B
Cluster 27 Zone 2B Division 26 8-Jan-2018 9-Jan-2018 8:00 AM 10-Jan-2018 B comments
Closed

Installation of PVC Conduit for Mechanical Power System for First Approved w/
285 KHEP-EL-0285
Floor at Roof slab Cluster 27 Zone 2B
Cluster 27 Zone 2B Division 26 8-Jan-2018 9-Jan-2018 8:10 AM 10-Jan-2018 B comments
Closed

Installation of PVC Conduit for Power System for Roof Floor at Roof
286 KHEP-EL-0286
Slab Cluster 27 Zone 2B
Cluster 27 Zone 2B Division 26 8-Jan-2018 9-Jan-2018 8:20 AM 10-Jan-2018 A Approved Closed

Installation of PVC Conduits & box for lighting System for Roof floor Approved w/
287 KHEP-EL-0287
at Roof slab in Cluster 27 Zone 2B
Cluster 27 Zone 2B Division 26 8-Jan-2018 9-Jan-2018 8:40 AM 10-Jan-2018 B comments
Closed

Installation of PVC Conduits & box for lighting System for First floor Approved w/
288 KHEP-EL-0288
at Roof slab in Cluster 27 Zone 2B
Cluster 27 Zone 2B Division 26 8-Jan-2018 9-Jan-2018 9:40 AM 10-Jan-2018 B comments
Closed

Installation of PVC Conduits & box for lighting System for Ground Approved w/
289 KHEP-EL-0289
floor at Firt Floor slab in Cluster 72 Zone 4B
Cluster 72 Zone 4B Division 26 9-Jan-2018 10-Jan-2018 8:00 AM 11-Jan-2018 B comments
Closed

Installation of PVC Conduit for Mechanical Power System for Ground Approved w/
290 KHEP-EL-0290
floor at Firt Floor slab Cluster 72 Zone 4B
Cluster 72 Zone 4B Division 26 9-Jan-2018 10-Jan-2018 8:10 AM 11-Jan-2018 B comments
Closed

Installation of PVC Conduit for Power System for First Floor at Firt
291 KHEP-EL-0291
Floor slab Cluster 72 Zone 4B
Cluster 72 Zone 4B Division 26 9-Jan-2018 10-Jan-2018 8:30 AM 11-Jan-2018 A Approved Closed

Installation of PVC Conduits for Power system for First Floor at First
292 KHEP-EL-0292
Floor Slab in Cluster 54 Zone 3B
Cluster 54 Zone 3B Division 26 10-Jan-2018 11-Jan-2018 9:00 AM 13-Jan-2018 A Approved Closed

Installation of PVC Conduits for Mechanical Power system for Ground Approved w/
293 KHEP-EL-0293
Floor at First Floor Slab in Cluster 54 Zone 3B
Cluster 54 Zone 3B Division 26 10-Jan-2018 11-Jan-2018 9:10 AM 13-Jan-2018 B comments
Closed

Installation of PVC Conduits & box for Lighting System for Ground Approved w/
294 KHEP-EL-0294
Floor at First Floor Slab in Cluster 54 Zone 3B
Cluster 54 Zone 3B Division 26 10-Jan-2018 11-Jan-2018 9:30 AM 15-Jan-2018 B comments
Closed

Installation of EMT conduits & outlets box for Exhaust Fan & Timer Approved w/
295 KHEP-EL-0295
Switch for ground floor in Cluster 69 Zone 4B
Cluster 69 Zone 4B Division 26 10-Jan-2018 11-Jan-2018 8:00 AM 13-Jan-2018 B comments
Closed

Installation of PVC Conduits & box for Lighting System for Roof Floor Approved w/
296 KHEP-EL-0296
at Roof Floor Slab in Cluster 52 Zone 3B
Cluster 52 Zone 3B Division 26 13-Jan-2018 14-Jan-2018 8:30 AM 15-Jan-2018 B comments
Closed

Installation of PVC Conduits for Power system for Roof Floor at Roof
297 KHEP-EL-0297
Floor Slab in Cluster 52 Zone 3B
Cluster 52 Zone 3B Division 26 13-Jan-2018 14-Jan-2018 8:45 AM 15-Jan-2018 A Approved Closed

Installation of PVC Conduits for Mechanical Power system for Roof Approved w/
298 KHEP-EL-0298
Floor at Roof Floor Slab in Cluster 52 Zone 3B
Cluster 52 Zone 3B Division 26 13-Jan-2018 14-Jan-2018 8:55 AM 15-Jan-2018 B comments
Closed

Installation of PVC Conduits for Power system for First Floor at Roof
299 KHEP-EL-0299
Floor Slab in Cluster 52 Zone 3B
Cluster 52 Zone 3B Division 26 13-Jan-2018 14-Jan-2018 9:00 AM 15-Jan-2018 A Approved Closed

Installation of PVC Conduits & box for Lighting System for First Floor Approved w/
300 KHEP-EL-0300
at First Floor Slab in Cluster 52 Zone 3B
Cluster 52 Zone 3B Division 26 13-Jan-2018 14-Jan-2018 9:15 AM 15-Jan-2018 B comments
Closed

Installation of PVC Conduits & box for Lighting System for Ground Approved w/
301 KHEP-EL-0301
Floor at First Floor Slab in Cluster 30 Zone 3B
Cluster 30 Zone 3B Division 26 13-Jan-2018 14-Jan-2018 9:30 AM 15-Jan-2018 B comments
Closed

Installation of PVC Conduits for Mechanical Power system for Ground


302 KHEP-EL-0302
Floor at First Floor Slab in Cluster 30 Zone 3B
Cluster 30 Zone 3B Division 26 13-Jan-2018 14-Jan-2018 9:40 AM 15-Jan-2018 A Approved Closed

Installation of PVC Conduits for Power system for First Floor at First
303 KHEP-EL-0303
Floor Slab in Cluster 30 Zone 3B
Cluster 30 Zone 3B Division 26 13-Jan-2018 14-Jan-2018 10:00 AM 15-Jan-2018 A Approved Closed

Installation of PVC Conduits for Power system for roof floor at roof
304 KHEP-EL-0304
floor Slab in Cluster 16 Zone 1B
Cluster 16 Zone 1B Division 26 14-Jan-2018 15-Jan-2018 8:30 AM 16-Jan-2018 A Approved Closed

Installation of PVC Conduits & box for Lighting System for roof floor Approved w/
305 KHEP-EL-0305
at roof floor Slab in Cluster 16 Zone 1B
Cluster 16 Zone 1B Division 26 14-Jan-2018 15-Jan-2018 8:50 AM 16-Jan-2018 B comments
Closed
Installation of PVC Conduits for Mechanical Power system for roof Approved w/
306 KHEP-EL-0306
floor at roof floor Slab in Cluster 16 Zone 1B
Cluster 16 Zone 1B Division 26 14-Jan-2018 15-Jan-2018 8:50 AM 16-Jan-2018 B comments
Closed

Installation of PVC Conduits for Mechanical Power system for first


307 KHEP-EL-0307
floor at roof floor Slab in Cluster 16 Zone 1B
Cluster 16 Zone 1B Division 26 14-Jan-2018 15-Jan-2018 9:15 AM 16-Jan-2018 A Approved Closed

Installation of PVC Conduits & box for Lighting System for first floor Approved w/
308 KHEP-EL-0308
at roof floor Slab in Cluster 16 Zone 1B
Cluster 16 Zone 1B Division 26 14-Jan-2018 15-Jan-2018 9:35 AM 16-Jan-2018 B comments
Closed

Installation of PVC Conduits & box for Lighting System for ground Approved w/
309 KHEP-EL-0309
floor at first floor Slab in Cluster 21 Zone 1B
Cluster 21 Zone 1B Division 26 15-Jan-2018 16-Jan-2018 8:15 AM 20-Jan-2018 B comments
Closed

Installation of PVC Conduits for Mechanical Power system for ground Approved w/
310 KHEP-EL-0310
floor at first floor Slab in Cluster 21 Zone 1B
Cluster 21 Zone 1B Division 26 15-Jan-2018 16-Jan-2018 8:45 AM 20-Jan-2018 B comments
Closed

Installation of PVC Conduits for Power system for first floor at first
311 KHEP-EL-0311
floor Slab in Cluster 21 Zone 1B
Cluster 21 Zone 1B Division 26 15-Jan-2018 16-Jan-2018 9:45 AM 20-Jan-2018 A Approved Closed

Installation black out foam for power system outlets for floor
312 KHEP-EL-0312
columns in Cluster 81 Zone 4B
Cluster 81 Zone 4B Division 26 15-Jan-2018 16-Jan-2018 8:00 AM 20-Jan-2018 E Rejected Closed

Installation of EMT conduits & outlets box for Mechanical power


Approved w/
313 KHEP-EL-0313 system for ground floor at ground floor slab in Cluster 69 Zone 4B Cluster 69 Zone 4B Division 26 15-Jan-2018 16-Jan-2018 8:30 AM 20-Jan-2018 B comments
Closed
Right Villa
Installation of pvc conduits for power system for roof floor at roof
314 KHEP-EL-0314
slab in cluster 71 Zone 4B
Cluster 71 Zone 4B Division 26 17-Jan-2018 18-Jan-2018 8:30 AM 20-Jan-2018 A Approved Closed

Installation of pvc conduits for mechanical power system for roof Approved w/
315 KHEP-EL-0315
floor at roof slab in Cluster 71 Zone 4B
Cluster 71 Zone 4B Division 26 17-Jan-2018 18-Jan-2018 8:40 AM 20-Jan-2018 B comments
Closed

Installation of pvc conduits and boxes for lighting system for roof Approved w/
316 KHEP-EL-0316
floor at roof slab in Cluster 71 Zone 4B
Cluster 71 Zone 4B Division 26 17-Jan-2018 18-Jan-2018 9:00 AM 20-Jan-2018 B comments
Closed

Installation of pvc conduits and boxes for lighting system for first Approved w/
317 KHEP-EL-0317
floor at roof slab in Cluster 71 Zone 4B
Cluster 71 Zone 4B Division 26 17-Jan-2018 18-Jan-2018 9:20 AM 20-Jan-2018 B comments
Closed

Installation of pvc conduits for mechanical power system for first Approved w/
318 KHEP-EL-0318
floor at roof slab in Cluster 71 Zone 4B
Cluster 71 Zone 4B Division 26 17-Jan-2018 18-Jan-2018 9:30 AM 20-Jan-2018 B comments
Closed

Installation of pvc sleeves for grounding system for grade beam in Approved w/
319 KHEP-EL-0319
Cluster 42 Zone 2B
Cluster 42 Zone 2B Division 26 17-Jan-2018 18-Jan-2018 9:30 AM 20-Jan-2018 B comments
Closed

Installation of black out foam for pvc installation for panelboard at Approved w/
320 KHEP-EL-0320
grade beam in Cluster 42 Zone 2B
Cluster 42 Zone 2B Division 26 17-Jan-2018 18-Jan-2018 9:45 AM 20-Jan-2018 B comments
Closed

Cable pulling of wiring cables for power lighting & power system at Approved w/
321 KHEP-EL-0321
first floor in Cluster 69 Zone 4B
Cluster 69 Zone 4B Division 26 18-Jan-2018 20-Jan-2018 9:45 AM 23-Jan-2018 B comments
Closed

Installation of lighting & power panelboard at ground floor in Cluster


322 KHEP-EL-0322 Cluster 69 Zone 4B Division 26 18-Jan-2018 20-Jan-2018 9:45 AM Open
69 Zone 4B
Cable pulling of wiring cables for lighting & power system at first Approved w/
323 KHEP-EL-0323
floor in Cluster 69 Zone 4B
Cluster 69 Zone 4B Division 26 18-Jan-2018 20-Jan-2018 9:45 AM 23-Jan-2018 B comments
Closed

Installation of 50mm PVC sleeves for grounding system at ground


324 KHEP-EL-0324
floor grade beam in Cluster 46 Zone 3A
Cluster 46 Zone 3A Division 26 21-Jan-2018 22-Jan-2018 9:50 AM 23-Jan-2018 A Approved Closed

Installation of black out foam for conduit installation of panelboard at Approved w/


325 KHEP-EL-0325
ground floor grade beam in Cluster 46 Zone 3A
Cluster 46 Zone 3A Division 26 21-Jan-2018 22-Jan-2018 10:00 AM 23-Jan-2018 B comments
Closed

Installation of pvc conduits for power system for first floor at first
326 KHEP-EL-0326
floor slab in Cluster 18 Zone 1B
Cluster 18 Zone 1B Division 26 22-Jan-2018 23-Jan-2018 8:00 AM 24-Jan-2018 A Approved Closed

Installation of pvc conduits for mechanical power system for ground Approved w/
327 KHEP-EL-0327
floor at first floor slab in Cluster 18 Zone 1B
Cluster 18 Zone 1B Division 26 22-Jan-2018 23-Jan-2018 8:30 AM 24-Jan-2018 B comments
Closed

Installation of PVC Conduits & box for Lighting System for ground Approved w/
328 KHEP-EL-0328
floor at first floor Slab in Cluster 18 Zone 1B
Cluster 18 Zone 1B Division 26 22-Jan-2018 23-Jan-2018 8:40 AM 25-Jan-2018 B comments
Closed

Installation of outlet box for power system at first floor in Cluster 15


329 KHEP-EL-0329
Zone 1B
Cluster 15 Zone 1B Division 26 23-Jan-2018 24-Jan-2018 8:30 AM 27-Jan-2018 E Rejected Closed

Installation of 50mm PVC sleeves for Grounding system at ground


330 KHEP-EL-0330
floor grade beam in Cluster 41 Zone 2B
Cluster 41 Zone 2B Division 26 23-Jan-2018 24-Jan-2018 8:40 AM 24-Jan-2018 A Approved Closed

Installation of blackout foam for pVC conduits installation of


331 KHEP-EL-0331
panelboard at ground floor grade beam in Cluster 41 Zone 2B
Cluster 41 Zone 2B Division 26 23-Jan-2018 24-Jan-2018 8:50 AM 24-Jan-2018 A Approved Closed

Installation of pvc conduits for mechanical power system for ground Approved w/
332 KHEP-EL-0332
floor at first floor slab in Cluster 66 Zone 4A
Cluster 66 Zone 4A Division 26 24-Jan-2018 25-Jan-2018 8:40 AM 27-Jan-2018 B comments
Closed

Installation of pvc conduits for power system for first floor at first Approved w/
333 KHEP-EL-0333
floor slab in Cluster 66 Zone 4A
Cluster 66 Zone 4A Division 26 24-Jan-2018 25-Jan-2018 9:40 AM 27-Jan-2018 B comments
Closed

Installation of PVC Conduits & box for Lighting System for ground
334 KHEP-EL-0334
floor at first floor Slab in Cluster 66 Zone A4
Cluster 66 Zone A4 Division 26 24-Jan-2018 25-Jan-2018 8:30 AM 27-Jan-2018 A Approved Closed

Cable pulling of 1CX4 sq.mm LV cable for power & lighting system
335 KHEP-EL-0335 for circuit connections & homerun for ground floor in Cluster 69 Zone Cluster 69 Zone 4B Division 26 28-Jan-2018 29-Jan-2018 8:00 AM 7-Feb-2018 E Rejected Closed
4B Garage & Telecom rooms area
Cable pulling of 1CX4 sq.mm wiring cable for power & lighting
336 KHEP-EL-0336
system homerun for ground floor in Cluster 69 Zone 4B
Cluster 69 Zone 4B Division 26 28-Jan-2018 29-Jan-2018 8:20 AM 31-Jan-2018 E Rejected Closed

Cable pulling of 1CX4 sq.mm wiring cable for power & lighting
337 KHEP-EL-0337
system homerun for first floor in Cluster 69 Zone 4B
Cluster 69 Zone 4B Division 26 28-Jan-2018 29-Jan-2018 8:30 AM 31-Jan-2018 E Rejected Closed
Cable pulling of 1CX4 sq.mm wiring cable for mechanical power
338 KHEP-EL-0338
system for ground floor in Cluster 69 Zone 4B
Cluster 69 Zone 4B Division 26 28-Jan-2018 29-Jan-2018 9:30 AM 31-Jan-2018 E Rejected Closed

Cable pulling of 1CX4 sq.mm wiring cable for mechanical power


339 KHEP-EL-0339
system for first floor in Cluster 69 Zone 4B
Cluster 69 Zone 4B Division 26 28-Jan-2018 29-Jan-2018 10:30 AM 31-Jan-2018 E Rejected Closed

Installation of PVC Conduits & box for Lighting System for ground Approved w/
340 KHEP-EL-0340
floor at first floor Slab in Cluster 44 Zone 2A
Cluster 44 Zone 2A Division 26 25-Jan-2018 27-Jan-2018 1:30 PM 28-Jan-2018 B comments
Closed

Installation of pvc conduits for power system for first floor at first Approved w/
341 KHEP-EL-0341
floor slab in Cluster 44 Zone 2A
Cluster 44 Zone 2A Division 26 25-Jan-2018 27-Jan-2018 1:50 PM 28-Jan-2018 B comments
Closed

Installation of pvc conduits for mechanical power system for ground Approved w/
342 KHEP-EL-0342
floor at first floor slab in Cluster 44 Zone 2A
Cluster 44 Zone 2A Division 26 25-Jan-2018 27-Jan-2018 2:50 PM 28-Jan-2018 B comments
Closed

Installation of 50mm PVC sleeves for grounding system for ground


343 KHEP-EL-0343
floor at grade beam in Cluster 26 Zone 2B
Cluster 26 Zone 2B Division 26 12-Feb-2018 13-Feb-2018 8:00 AM 13-Feb-2018 A Approved Closed

Installation of black out foam for conduit installation of panelboard at Approved w/


344 KHEP-EL-0344
ground floor grade beam in Cluster 26 Zone 2B
Cluster 26 Zone 2B Division 26 12-Feb-2018 13-Feb-2018 8:40 AM 13-Feb-2018 B comments
Closed

Installation of PVC Conduits & box for Lighting System for ground Approved w/
345 KHEP-EL-0345
floor at first floor Slab in Cluster 23 Zone 1B
Cluster 23 Zone 1B Division 26 27-Jan-2018 28-Jan-2018 1:30 PM 31-Jan-2018 B comments
Closed

Installation of pvc conduits for power system for first floor at first Approved w/
346 KHEP-EL-0346
floor slab in Cluster 23 Zone 1B
Cluster 23 Zone 1B Division 26 27-Jan-2018 28-Jan-2018 1:40 PM 31-Jan-2018 B comments
Closed

Installation of pvc conduits for mechanical power system for ground Approved w/
347 KHEP-EL-0347
floor at first floor slab in Cluster 23 Zone 1B
Cluster 23 Zone 1B Division 26 27-Jan-2018 28-Jan-2018 2:40 PM 30-Jan-2018 B comments
Closed

Installation of pvc conduits for mechanical power system for ground Approved w/
348 KHEP-EL-0348
floor at ground floor slab in Cluster 14 Zone 1B
Cluster 14 Zone 1B Division 26 27-Jan-2018 28-Jan-2018 8:40 AM 29-Jan-2018 B comments
Closed

Installation of pvc conduits for power system for ground floor at Approved w/
349 KHEP-EL-0349
ground floor slab in Cluster 14 Zone 1B
Cluster 14 Zone 1B Division 26 27-Jan-2018 28-Jan-2018 8:50 AM 29-Jan-2018 B comments
Closed

Installation of pvc conduits for mechanical power system for ground Approved w/
350 KHEP-EL-0350
floor in Cluster 69 Zone 4B
Cluster 69 Zone 4B Division 26 27-Jan-2018 28-Jan-2018 9:00 AM 30-Jan-2018 B comments
Closed

Cable pulling of wiring cable for power & lighting system for ground
351 KHEP-EL-0351
floor at garage & Telecom room areas in Cluster 69 Zone 4B
Cluster 69 Zone 4B Division 26 27-Jan-2018 28-Jan-2018 9:00 AM 30-Jan-2018 E Rejected Closed

Cable pulling of wiring cable for power & lighting system for first floor
352 KHEP-EL-0352
at garage & Telecom room areas in Cluster 69 Zone 4B
Cluster 69 Zone 4B Division 26 27-Jan-2018 28-Jan-2018 9:10 AM 30-Jan-2018 E Rejected Closed

Installation of PVC Conduits & box for Lighting System for ground Approved w/
353 KHEP-EL-0353
floor at first floor Slab in Cluster 60 Zone 3B
Cluster 60 Zone 3B Division 26 29-Jan-2018 30-Jan-2018 8:10 AM 31-Jan-2018 B comments
Closed

Installation of PVC Conduits & box for Lighting System for ground
354 KHEP-EL-0354
floor at first floor Slab in Cluster 60 Zone 3B
Cluster 60 Zone 3B Division 26 29-Jan-2018 30-Jan-2018 8:20 AM 31-Jan-2018 A Approved Closed

Installation of pvc conduits for mechanical power system for ground Approved w/
355 KHEP-EL-0355
floor at first floor slab in Cluster 60 Zone 3B
Cluster 60 Zone 3B Division 26 29-Jan-2018 30-Jan-2018 8:30 AM 31-Jan-2018 B comments
Closed

Installation of pvc conduits for power system for ground floor slab in Approved w/
356 KHEP-EL-0356
Cluster 13 Zone 1B
Cluster 13 Zone 1B Division 26 29-Jan-2018 30-Jan-2018 1:30 PM 31-Jan-2018 B comments
Closed

Installation of pvc conduits for mechanical power system for ground


357 KHEP-EL-0357
floor at first floor slab in Cluster 13 Zone 1B
Cluster 13 Zone 1B Division 26 29-Jan-2018 30-Jan-2018 1:30 PM 31-Jan-2018 A Approved Closed

Installation of 50mm PVC sleeves for grounding system at ground Approved w/


358 KHEP-EL-0358
floor gradebeam slab at Cluster 45
Cluster 45 Zone 3A Division 26 30-Jan-2018 31-Jan-2018 8:00 AM 31-Jan-2018 B comments
Closed

Installation of blackout foam for PVC conduits installation of Approved w/


359 KHEP-EL-0359
panelboard at ground floor grade beam in Cluster 45 Zone 3A
Cluster 45 Zone 3A Division 26 30-Jan-2018 31-Jan-2018 8:20 AM 31-Jan-2018 B comments
Closed

Installation of pvc conduits for power system for roof floor & roof
360 KHEP-EL-0360
slab in Cluster 4 Zone 1A
Cluster 4 Zone 1A Division 27 31-Jan-2018 1-Feb-2018 8:00 AM 1-Feb-2018 A Approved Closed

Installation of pvc conduits for mechanical power system for roof


361 KHEP-EL-0361
floor & roof slab in Cluster 4 Zone 1A
Cluster 4 Zone 1A Division 27 31-Jan-2018 1-Feb-2018 8:30 AM 1-Feb-2018 E Rejected Closed

Installation of pvc conduits for mechanical power system for roof Approved w/
361.1 KHEP-EL-0361-01
floor & roof slab in Cluster 4 Zone 1A
Cluster 4 Zone 1A Division 26 18-Feb-2018 19-Feb-2018 8:30 AM 19-Feb-2018 B comments
Closed

Installation of PVC conduits & GI boxes for first floor mechanical Approved w/
362 KHEP-EL-0362
power system at roof slab of Cluster 4 Zone 1A
Cluster 4 Zone 1A Division 27 31-Jan-2018 1-Feb-2018 9:00 AM 1-Feb-2018 B comments
Closed

Installation of PVC conduits & GI boxes for first floor lighting system Approved w/
363 KHEP-EL-0363
at roof slab of Cluster 4 Zone 1A
Cluster 4 Zone 1A Division 27 31-Jan-2018 1-Feb-2018 9:30 AM 6-Feb-2018 B comments
Closed

Installation of PVC conduits & GI boxes for roof floor lighting system Approved w/
364 KHEP-EL-0364
at roof slab of Cluster 4 Zone 1A
Cluster 4 Zone 1A Division 27 31-Jan-2018 1-Feb-2018 10:00 AM 6-Feb-2018 B comments
Closed

Installation of PVC conduits for Power system for ground floor Cluster Approved w/
365 KHEP-EL-0365
5 Zone 1B
Cluster 5 Zone 1B Division 26 1-Feb-2018 3-Feb-2018 8:20 AM 6-Feb-2018 B comments
Closed

Installation of pvc conduits for Mechanical power system for ground Approved w/
366 KHEP-EL-0366
floor in Cluster 5 Zone 1B
Cluster 5 Zone 1B Division 26 1-Feb-2018 3-Feb-2018 8:20 AM 6-Feb-2018 B comments
Closed

Installation of pvc conduits for Mechanical power system for roof


367 KHEP-EL-0367
floor at roof floor slab in Cluster 6 Zone 1B
Cluster 6 Zone 1B Division 26 3-Feb-2018 4-Feb-2018 8:30 AM 5-Feb-2018 A Approved Closed

Installation of pvc conduits for Mechanical power system for first Approved w/
368 KHEP-EL-0368
floor at roof floor slab in Cluster 6 Zone 1B
Cluster 6 Zone 1B Division 26 3-Feb-2018 4-Feb-2018 8:40 AM 6-Feb-2018 B comments
Closed
Installation of PVC conduits for Power system for roof floor at roof
369 KHEP-EL-0369
floor slab in Cluster 6 Zone 1B
Cluster 6 Zone 1B Division 26 3-Feb-2018 4-Feb-2018 9:40 AM 5-Feb-2018 A Approved Closed

Installation of PVC Conduits & box for Lighting System for roof floor Approved w/
370 KHEP-EL-0370
at roof floor slab in Cluster 6 Zone 1B
Cluster 6 Zone 1B Division 26 3-Feb-2018 4-Feb-2018 9:30 AM 6-Feb-2018 B comments
Closed

Installation of PVC Conduits & box for Lighting System for first floor Approved w/
371 KHEP-EL-0371
at roof floor slab in Cluster 6 Zone 1B
Cluster 6 Zone 1B Division 26 3-Feb-2018 4-Feb-2018 10:30 AM 6-Feb-2018 B comments
Closed

Installation of PVC Conduits & box for Lighting System for ground Approved w/
372 KHEP-EL-0372
floor at first floor slab in Cluster 63 Zone 3B
Cluster 63 Zone 3B Division 26 3-Feb-2018 4-Feb-2018 8:00 AM 6-Feb-2018 B comments
Closed

Installation of PVC conduits for Power system for first floor at first
373 KHEP-EL-0373
floor slab in Cluster 63 Zone 3B
Cluster 63 Zone 3B Division 26 3-Feb-2018 4-Feb-2018 8:10 AM 5-Feb-2018 A Approved Closed

Installation of pvc conduits for Mechanical power system for ground Approved w/
374 KHEP-EL-0374
floor at first floor slab in Cluster 63 Zone 3B
Cluster 63 Zone 3B Division 26 3-Feb-2018 4-Feb-2018 8:50 AM 5-Feb-2018 B comments
Closed

Installation of 50mm PVC sleeves for grounding system for ground


375 KHEP-EL-0375
floor grade beam in Cluster 40 Zone 2B
Cluster 40 Zone 2B Division 26 3-Feb-2018 4-Feb-2018 1:30 PM 5-Feb-2018 A Approved Closed

Installation of blackout foam for PVC conduits installation of Approved w/


376 KHEP-EL-0376
panelboard at ground floor grade beam in Cluster 40 Zone 2B
Cluster 40 Zone 2B Division 26 3-Feb-2018 4-Feb-2018 1:40 PM 5-Feb-2018 B comments
Closed

Installation of PVC conduits for power system for roof floor at roof
377 KHEP-EL-0377
slab in Cluster 73 Zone 4B
Cluster 73 Zone 4B Division 26 5-Feb-2018 6-Feb-2018 8:30 AM 7-Feb-2018 A Approved Closed

Installation of pvc conduits for Mechanical power system for roof Approved w/
378 KHEP-EL-0378
floor at roof slab in Cluster 73 Zone 4B
Cluster 73 Zone 4B Division 26 5-Feb-2018 6-Feb-2018 8:40 AM 7-Feb-2018 B comments
Closed

Installation of pvc conduits for Mechanical power system for first Approved w/
379 KHEP-EL-0379
floor at roof slab in Cluster 73 Zone 4B
Cluster 73 Zone 4B Division 26 5-Feb-2018 6-Feb-2018 9:00 AM 7-Feb-2018 B comments
Closed

Installation of PVC Conduits & box for Lighting System for first floor Approved w/
380 KHEP-EL-0380
at roof slab in Cluster 73 Zone 4B
Cluster 73 Zone 4B Division 26 5-Feb-2018 6-Feb-2018 9:10 AM 10-Feb-2018 B comments
Closed

Installation of PVC Conduits & box for Lighting System for roof floor Approved w/
381 KHEP-EL-0381
at roof slab in Cluster 73 Zone 4B
Cluster 73 Zone 4B Division 26 5-Feb-2018 6-Feb-2018 9:20 AM 10-Feb-2018 B comments
Closed

Installation of 110mm PVCconduits from KW-HR meter to panel


382 KHEP-EL-0382
board at ground floor in Cluster 17 Zone 1B
Cluster 17 Zone 1B Division 26 5-Feb-2018 6-Feb-2018 8:20 AM 7-Feb-2018 E Rejected Closed

Installation of 110mm PVCconduits from KW-HR meter to panel Approved w/


382.1 KHEP-EL-0382-01
board at ground floor in Cluster 17 Zone 1B
Cluster 17 Zone 1B Division 26 20-Feb-2018 21-Feb-2018 8:20 AM 21-Feb-2018 B comments
Closed

Installation of PVC conduits for power system for ground floor slab in Approved w/
383 KHEP-EL-0383
Cluster 10 Zone 1B
Cluster 10 Zone 1B Division 26 5-Feb-2018 6-Feb-2018 2:00 PM 7-Feb-2018 B comments
Closed

Installation of pvc conduits for Mechanical power system for ground Approved w/
384 KHEP-EL-0384
floor slab in Cluster 10 Zone 1B
Cluster 10 Zone 1B Division 26 5-Feb-2018 6-Feb-2018 2:10 PM 7-Feb-2018 B comments
Closed

Installation of PVC Conduits & box for Lighting System for roof floor Approved w/
385 KHEP-EL-0385
at roof slab in Cluster 33 Zone 2B
Cluster 33 Zone 2B Division 26 6-Feb-2018 7-Feb-2018 8:10 AM 10-Feb-2018 B comments
Closed

Installation of PVC conduits for power system for roof floor at roof
386 KHEP-EL-0386
slab in Cluster 33 Zone 2B
Cluster 33 Zone 2B Division 26 6-Feb-2018 7-Feb-2018 8:20 AM 7-Feb-2018 A Approved Closed

Installation of pvc conduits for Mechanical power system for roof


387 KHEP-EL-0387
floor at roof slab in Cluster 33 Zone 2B
Cluster 33 Zone 2B Division 26 6-Feb-2018 7-Feb-2018 8:30 AM 7-Feb-2018 A Approved Closed

Installation of PVC Conduits & box for Lighting System for first floor Approved w/
388 KHEP-EL-0388
at roof slab in Cluster 33 Zone 2B
Cluster 33 Zone 2B Division 26 6-Feb-2018 7-Feb-2018 8:40 AM 10-Feb-2018 B comments
Closed

Installation of pvc conduits for Mechanical power system for first Approved w/
389 KHEP-EL-0389
floor at roof slab in Cluster 33 Zone 2B
Cluster 33 Zone 2B Division 26 6-Feb-2018 7-Feb-2018 9:00 AM 7-Feb-2018 B comments
Closed

Installation of PVC Conduits & box for Lighting System for ground Approved w/
390 KHEP-EL-0390
floor at first floor slab in Cluster 43 Zone 2A
Cluster 43 Zone 2A Division 26 7-Feb-2018 8-Feb-2018 8:00 AM 10-Feb-2018 B comments
Closed

Installation of PVC conduits for power system for ground floor slab in Approved w/
391 KHEP-EL-0391
Cluster 7 Zone 1B
Cluster 7 Zone 1B Division 26 7-Feb-2018 8-Feb-2018 8:30 AM 10-Feb-2018 B comments
Closed

Installation of pvc conduits for Mechanical power system for Approved w/


392 KHEP-EL-0392
ground floor slab in Cluster 7 Zone 1B
Cluster 7 Zone 1B Division 26 7-Feb-2018 8-Feb-2018 8:40 AM 10-Feb-2018 B comments
Closed

Installation of 50mm PVC sleeves for grounding system & mechanical


393 KHEP-EL-0393
power at ground floor in Clucter 56 Zone 3B
Clucter 56 Zone 3B Division 26 7-Feb-2018 10-Feb-2018 8:40 AM 13-Feb-2018 A Approved Closed

Installation of blackout foam for conduit installation for panel board Approved w/
394 KHEP-EL-0394
at ground floor in Cluster 56 Zone 3B
Clucter 56 Zone 3B Division 26 7-Feb-2018 10-Feb-2018 8:50 AM 13-Feb-2018 B comments
Closed

Installation of pvc conduits for Mechanical power system for ground Approved w/
395 KHEP-EL-0395
floor in Cluster 43 Zone 2A
Clucter 43 Zone 2A Division 26 10-Feb-2018 11-Feb-2018 1:00 PM 12-Feb-2018 B comments
Closed

Installation of pvc conduits for power system for first floor at first Approved w/
396 KHEP-EL-0396
floor slab in Cluster 43 Zone 2A
Clucter 43 Zone 2A Division 26 10-Feb-2018 11-Feb-2018 1:30 PM 12-Feb-2018 B comments
Closed

Installation of pvc conduits for power system for first floor at first
397 KHEP-EL-0397
floor slab in Cluster 22 Zone 1B
Cluster 22 Zone 1B Division 26 11-Feb-2018 12-Feb-2018 8:30 AM 13-Feb-2018 A Approved Closed

Installation of PVC Conduits & box for Lighting System for ground Approved w/
398 KHEP-EL-0398
floor at first floor slab in Cluster 22 Zone 1B
Cluster 22 Zone 1B Division 26 11-Feb-2018 12-Feb-2018 8:40 AM 13-Feb-2018 B comments
Closed

Installation of pvc conduits for Mechanical power system for Approved w/


399 KHEP-EL-0399
ground floor at first floor slab in Cluster 22 Zone 1B
Cluster 22 Zone 1B Division 26 11-Feb-2018 12-Feb-2018 9:00 AM 13-Feb-2018 B comments
Closed

Installation of pvc conduits for power system for roof floor at roof Approved w/
400 KHEP-EL-0400
slab in Cluster 21 Zone 1B
Cluster 21 Zone 1B Division 26 11-Feb-2018 12-Feb-2018 1:20 PM 13-Feb-2018 B comments
Closed
Installation of PVC Conduits & box for Lighting System for roof floor Approved w/
401 KHEP-EL-0401
at roof slab in Cluster 21 Zone 1B
Cluster 21 Zone 1B Division 26 11-Feb-2018 12-Feb-2018 1:40 PM 13-Feb-2018 B comments
Closed

Installation of pvc conduits for Mechanical power system for roof


402 KHEP-EL-0402
floor at roof slab in Cluster 21 Zone 1B
Cluster 21 Zone 1B Division 26 11-Feb-2018 12-Feb-2018 2:40 PM 13-Feb-2018 A Approved Closed

Installation of pvc conduits for Mechanical power system for first Approved w/
403 KHEP-EL-0403
floor at roof slab in Cluster 21 Zone 1B
Cluster 21 Zone 1B Division 26 11-Feb-2018 12-Feb-2018 2:45 PM 13-Feb-2018 B comments
Closed

Installation of PVC Conduits & box for Lighting System for first floor Approved w/
404 KHEP-EL-0404
at roof slab in Cluster 21 Zone 1B
Cluster 21 Zone 1B Division 26 11-Feb-2018 12-Feb-2018 2:00 PM 13-Feb-2018 B comments
Closed

Installation of pvc conduits for power system for first floor at first
405 KHEP-EL-0405
floor slab in Cluster 24 Zone 2B
Cluster 24 Zone 2B Division 26 12-Feb-2018 13-Feb-2018 9:00 AM 14-Feb-2018 A Approved Closed

Installation of pvc conduits for Mechanical power system for ground


406 KHEP-EL-0406
floor at first floor slab in Cluster 24 Zone 2B
Cluster 24 Zone 2B Division 26 12-Feb-2018 13-Feb-2018 9:10 AM 14-Feb-2018 A Approved Closed

Installation of PVC Conduits & box for Lighting System for ground Approved w/
407 KHEP-EL-0407
floor at first floor slab in Cluster 24 Zone 2B
Cluster 24 Zone 2B Division 26 12-Feb-2018 13-Feb-2018 9:20 AM 13-Feb-2018 B comments
Closed

Installation of PVC Conduits & box for Lighting System for ground Approved w/
408 KHEP-EL-0408
floor at first floor slab in Cluster 50 Zone 3B
Cluster 50 Zone 3B Division 26 13-Feb-2018 14-Feb-2018 8:00 AM 14-Feb-2018 B comments
Closed

Installation of pvc conduits for Mechanical power system for ground Approved w/
409 KHEP-EL-0409
floor at first floor slab in Cluster 50 Zone 3B
Cluster 50 Zone 3B Division 26 13-Feb-2018 14-Feb-2018 8:30 AM 17-Feb-2018 B comments
Closed

Installation of pvc conduits for power system for first floor at first
410 KHEP-EL-0410
floor slab in Cluster 50 Zone 3B
Cluster 50 Zone 3B Division 26 13-Feb-2018 14-Feb-2018 8:30 AM 17-Feb-2018 A Approved Closed

Installation of pvc conduits for Mechanical power system for roof Approved w/
411 KHEP-EL-0411
floor at roof slab in Cluster 30 Zone 2B
Cluster 30 Zone 2B Division 26 15-Feb-2018 17-Feb-2018 8:00 AM 18-Feb-2018 B comments
Closed

Installation of pvc conduits for power system for roof floor at roof Approved w/
412 KHEP-EL-0412
slab in Cluster 30 Zone 2B
Cluster 30 Zone 2B Division 26 15-Feb-2018 17-Feb-2018 8:20 AM 18-Feb-2018 B comments
Closed

Installation of PVC Conduits & box for Lighting System for roof floor Approved w/
413 KHEP-EL-0413
at roof slab in Cluster 30 Zone 2B
Cluster 30 Zone 2B Division 26 15-Feb-2018 17-Feb-2018 8:10 AM 18-Feb-2018 B comments
Closed

Installation of PVC Conduits & box for Lighting System for first floor Approved w/
414 KHEP-EL-0414
at roof slab in Cluster 30 Zone 2B
Cluster 30 Zone 2B Division 26 15-Feb-2018 17-Feb-2018 8:30 AM 18-Feb-2018 B comments
Closed

Installation of pvc conduits for Mechanical power system for first Approved w/
415 KHEP-EL-0415
floor at roof slab in Cluster 30 Zone 2B
Cluster 30 Zone 2B Division 26 15-Feb-2018 17-Feb-2018 8:40 AM 18-Feb-2018 B comments
Closed

Installation of pvc conduits for Mechanical power system for ground Approved w/
416 KHEP-EL-0416
floor at first floor slab in Cluster 64 Zone 3B
Cluster 64 Zone 3B Division 26 15-Feb-2018 19-Feb-2018 9:00 AM 19-Feb-2018 B comments
Closed

Installation of pvc conduits for power system for first floor at first
417 KHEP-EL-0417
floor slab in Cluster 64 Zone 3B
Cluster 64 Zone 3B Division 26 18-Feb-2018 19-Feb-2018 9:20 AM 19-Feb-2018 A Approved Closed

Installation of PVC Conduits & box for Lighting System for ground Approved w/
418 KHEP-EL-0418
floor at first floor slab in Cluster 64 Zone 3B
Cluster 64 Zone 3B Division 26 18-Feb-2018 19-Feb-2018 9:10 AM 19-Feb-2018 B comments
Closed

Installation of PVC Conduits & box for Lighting System for first floor
419 KHEP-EL-0419 Cluster 64 Zone 3B Division 26 15-Feb-2018 17-Feb-2018 9:30 AM RECALLED
at roof slab in Cluster 64 Zone 3B
Installation of pvc conduits for Mechanical power system for first
420 KHEP-EL-0420 Cluster 64 Zone 3B Division 26 15-Feb-2018 17-Feb-2018 9:40 AM RECALLED
floor at roof slab in Cluster 64 Zone 3B
Installation of pvc conduits for Mechanical power system for roof
421 KHEP-EL-0421 Cluster 09 Zone 1B Division 26 15-Feb-2018 17-Feb-2018 1:00 PM Open
floor at roof slab in Cluster 09 Zone 1B
Installation of pvc conduits for power system for roof floor at roof
422 KHEP-EL-0422 Cluster 09 Zone 1B Division 26 15-Feb-2018 17-Feb-2018 1:20 PM Open
slab in Cluster 09 Zone 1B
Installation of PVC Conduits & box for Lighting System for roof floor
423 KHEP-EL-0423 Cluster 09 Zone 1B Division 26 15-Feb-2018 17-Feb-2018 1:10 PM Open
at roof slab in Cluster 09 Zone 1B
Installation of PVC Conduits & box for Lighting System for first floor
424 KHEP-EL-0424 Cluster 09 Zone 1B Division 26 15-Feb-2018 17-Feb-2018 1:30 PM Open
at roof slab in Cluster 09 Zone 1B
Installation of pvc conduits for Mechanical power system for first
425 KHEP-EL-0425 Cluster 09 Zone 1B Division 26 15-Feb-2018 17-Feb-2018 1:40 PM Open
floor at roof slab in Cluster 09 Zone 1B
Installation of pvc conduits for Mechanical power system for ground
426 KHEP-EL-0426
floor in Cluster 11 Zone 1B
Cluster 11 Zone 1B Division 26 18-Feb-2018 19-Feb-2018 1:00 AM 19-Feb-2018 A Approved Closed

Installation of pvc conduits for power system for ground floor in Approved w/
427 KHEP-EL-0427
Cluster 11 Zone 1B
Cluster 11 Zone 1B Division 26 18-Feb-2018 19-Feb-2018 1:10 PM 19-Feb-2018 B comments
Closed

Installation of pvc conduits for power system for ground floor in Approved w/
428 KHEP-EL-0428
Cluster 12 Zone 1B
Cluster 11 Zone 1B Division 26 18-Feb-2018 19-Feb-2018 1:20 PM 19-Feb-2018 B comments
Closed

Installation of pvc conduits for Mechanical power system for ground


429 KHEP-EL-0429
floor in Cluster 12 Zone 1B
Cluster 11 Zone 1B Division 26 18-Feb-2018 19-Feb-2018 1:30 PM 19-Feb-2018 A Approved Closed

Installation of pvc conduits for Mechanical power system for ground Approved w/
430 KHEP-EL-0430
floor at first floor slab in Cluster 25 Zone 2A
Cluster 25 Zone 2A Division 26 18-Feb-2018 19-Feb-2018 8:00 AM 19-Feb-2018 B comments
Closed

Installation of pvc conduits for power system for first floor slab in
431 KHEP-EL-0431
Cluster 25 Zone 2A
Cluster 25 Zone 2A Division 26 18-Feb-2018 19-Feb-2018 8:20 AM 19-Feb-2018 A Approved Closed

Installation of PVC Conduits & box for Lighting System for ground Approved w/
432 KHEP-EL-0432
floor at first floor slab in Cluster 25 Zone 2A
Cluster 25 Zone 2A Division 26 18-Feb-2018 19-Feb-2018 8:30 AM 19-Feb-2018 B comments
Closed

Installation of PVC Conduits & box for Lighting System for roof floor Approved w/
433 KHEP-EL-0433
at roof slab in Cluster 34 Zone 2B
Cluster 34 Zone 2B Division 26 18-Feb-2018 19-Feb-2018 9:30 AM 19-Feb-2018 B comments
Closed
Installation of PVC Conduits & box for Lighting System for first floor Approved w/
434 KHEP-EL-0434
at roof floor slab in Cluster 34 Zone 2B
Cluster 34 Zone 2B Division 26 18-Feb-2018 19-Feb-2018 9:40 AM 19-Feb-2018 B comments
Closed

Installation of pvc conduits for power system for roof floor at roof
435 KHEP-EL-0435
floor slab in Cluster 34 Zone 2B
Cluster 34 Zone 2B Division 26 18-Feb-2018 19-Feb-2018 9:50 AM 19-Feb-2018 A Approved Closed

Installation of pvc conduits for Mechanical power system for roof


436 KHEP-EL-0436
floor at roof floor slab in Cluster 34 Zone 2B
Cluster 34 Zone 2B Division 26 18-Feb-2018 19-Feb-2018 10:00 AM 19-Feb-2018 A Approved Closed

Installation of pvc conduits for Mechanical power system for first Approved w/
437 KHEP-EL-0437
floor at first floor slab in Cluster 34 Zone 2B
Cluster 34 Zone 2B Division 26 18-Feb-2018 19-Feb-2018 10:20 AM 19-Feb-2018 B comments
Closed

Installation of pvc conduits for Mechanical power system for first Approved w/
438 KHEP-EL-0438
floor at roof floor slab in Cluster 18 Zone 1B
Cluster 18 Zone 1B Division 26 19-Feb-2018 20-Feb-2018 8:00 AM 21-Feb-2018 B comments
Closed

Installation of pvc conduits for Mechanical power system for roof


439 KHEP-EL-0439
floor at roof floor slab in Cluster 18 Zone 1B
Cluster 18 Zone 1B Division 26 19-Feb-2018 20-Feb-2018 8:10 AM 21-Feb-2018 A Approved Closed

Installation of pvc conduits for power system for roof floor at roof
440 KHEP-EL-0440
floor slab in Cluster 18 Zone 1B
Cluster 18 Zone 1B Division 26 19-Feb-2018 20-Feb-2018 8:20 AM 21-Feb-2018 A Approved Closed

Installation of PVC Conduits & box for Lighting System for roof floor Approved w/
441 KHEP-EL-0441
at roof floor slab in Cluster 18 Zone 1B
Cluster 18 Zone 1B Division 26 19-Feb-2018 20-Feb-2018 8:40 AM 20-Feb-2018 B comments
Closed

Installation of PVC Conduits & box for Lighting System for first floor Approved w/
442 KHEP-EL-0442
at roof floor slab in Cluster 18 Zone 1B
Cluster 18 Zone 1B Division 26 19-Feb-2018 20-Feb-2018 8:40 AM 20-Feb-2018 B comments
Closed

Installation of pvc conduits for power system for roof floor at roof
443 KHEP-EL-0443
floor slab in Cluster 72 Zone 4B
Cluster 72 Zone 4B Division 26 20-Feb-2018 21-Feb-2018 8:00 AM 21-Feb-2018 A Approved Closed

Installation of PVC Conduits & box for Lighting System for roof floor Approved w/
444 KHEP-EL-0444
at roof floor slab in Cluster 72 Zone 4B
Cluster 72 Zone 4B Division 26 20-Feb-2018 21-Feb-2018 8:10 AM 21-Feb-2018 B comments
Closed

Installation of pvc conduits for Mechanical power system for roof Approved w/
445 KHEP-EL-0445
floor at roof floor slab in Cluster 72 Zone 4B
Cluster 72 Zone 4B Division 26 20-Feb-2018 21-Feb-2018 8:20 AM 21-Feb-2018 B comments
Closed

Installation of 110mm uPVC conduits for panel board & 32 mm uPVC Approved w/
446 KHEP-EL-0446
conduits for grounding system in Cluster 20 Zone 1B
Cluster 20 Zone 1B Division 26 20-Feb-2018 21-Feb-2018 8:20 AM 21-Feb-2018 B comments
Closed

Installation of 110mm uPVC conduits for panel board & 32 mm uPVC Approved w/
447 KHEP-EL-0447
conduits for grounding system in Cluster 19 Zone 1B
Cluster 19 Zone 1B Division 26 20-Feb-2018 21-Feb-2018 1:20 PM 21-Feb-2018 B comments
Closed

Installation of 110mm uPVC conduits for panel board & 32 mm uPVC Approved w/
448 KHEP-EL-0448
conduits for grounding system in Cluster 19 Zone 1B
Cluster 19 Zone 1B Division 26 20-Feb-2018 21-Feb-2018 1:40 PM 24-Feb-2018 B comments
Closed

Installation of 50mm & 75mm PVC sleeves for grounding system & Approved w/
449 KHEP-EL-0449
mechanical power at ground floor in Cluster 29 Zone 2B
Cluster 29 Zone 2B Division 26 21-Feb-2018 22-Feb-2018 8:00 AM 24-Feb-2018 B comments
Closed

Installation of blackout foam for PVC conduits installation for panel Approved w/
450 KHEP-EL-0450
board at ground floor grade beam in Cluster 29 Zone 2B
Cluster 29 Zone 2B Division 26 21-Feb-2018 22-Feb-2018 8:10 AM 24-Feb-2018 B comments
Closed

Installation of pvc conduits for Mechanical power system for roof Approved w/
451 KHEP-EL-0451
floor at roof slab in Cluster 58 Zone 3B
Cluster 58 Zone 3B Division 26 21-Feb-2018 22-Feb-2018 8:20 AM 24-Feb-2018 B comments
Closed

Installation of pvc conduits for Mechanical power system for first Approved w/
452 KHEP-EL-0452
floor at roof slab in Cluster 58 Zone 3B
Cluster 58 Zone 3B Division 26 21-Feb-2018 22-Feb-2018 8:30 AM 24-Feb-2018 B comments
Closed

Installation of pvc conduits for power system for roof floor at roof
453 KHEP-EL-0453
slab in Cluster 58 Zone 3B
Cluster 58 Zone 3B Division 26 21-Feb-2018 22-Feb-2018 8:40 AM 24-Feb-2018 A Approved Closed

Installation of PVC Conduits & box for Lighting System for roof floor Approved w/
454 KHEP-EL-0454
at roof slab in Cluster 58 Zone 3B
Cluster 58 Zone 3B Division 26 21-Feb-2018 22-Feb-2018 8:40 AM 24-Feb-2018 B comments
Closed

Installation of PVC Conduits & box for Lighting System for first floor Approved w/
455 KHEP-EL-0455
at roof slab in Cluster 58 Zone 3B
Cluster 58 Zone 3B Division 26 21-Feb-2018 22-Feb-2018 8:40 AM 24-Feb-2018 B comments
Closed

Installation of PVC Conduits & box for Lighting System for roof floor Approved w/
456 KHEP-EL-0456
at roof slab in Cluster 72 Zone 4B
Cluster 72 Zone 4B Division 26 21-Feb-2018 22-Feb-2018 10:00 AM 24-Feb-2018 B comments
Closed

Installation of pvc conduits for Mechanical power system for roof Approved w/
457 KHEP-EL-0457
floor at roof slab in Cluster 72 Zone 4B
Cluster 72 Zone 4B Division 26 21-Feb-2018 22-Feb-2018 10:10 AM 24-Feb-2018 B comments
Closed

Installation of PVC conduit & box for lighting system for roof floor at
458 KHEP-EL-0458
roof slab in cluster 44
Cluster 44 Zone 2A Division 26 22-Feb-2018 24-Feb-2018 8:10 AM 25-Feb-2018 A Approved Closed

Installation of PVC conduit & box for lighting system for first floor at
459 KHEP-EL-0459
roof slab in cluster 44
Cluster 44 Zone 2A Division 26 22-Feb-2018 24-Feb-2018 8:20 AM 25-Feb-2018 A Approved Closed

Installation of PVC conduit for mechanical power system for first floor Approved w/
460 KHEP-EL-0460
at roof slab in cluster 44
Cluster 44 Zone 2A Division 26 22-Feb-2018 24-Feb-2018 8:30 AM 25-Feb-2018 B comments
Closed

Installation of PVC conduit for mechanical power system for roof Approved w/
461 KHEP-EL-0461
floor at roof slab in cluster 44
Cluster 44 Zone 2A Division 26 22-Feb-2018 24-Feb-2018 8:40 AM 25-Feb-2018 B comments
Closed

Installation of PVC conduit for power system for roof floor at roof
462 KHEP-EL-0462
slab in cluster 44
Cluster 44 Zone 2A Division 26 22-Feb-2018 24-Feb-2018 8:50 AM 25-Feb-2018 A Approved Closed

Installation of PVC conduit & box for lighting system for roof floor at Approved w/
463 KHEP-EL-0463
roof slab in cluster 35
Cluster 35 Zone 2B Division 26 22-Feb-2018 24-Feb-2018 1:10 PM 25-Feb-2018 B comments
Closed

Installation of PVC conduit & box for lighting system for roof floor at Approved w/
464 KHEP-EL-0464
roof slab in cluster 35
Cluster 35 Zone 2B Division 26 22-Feb-2018 24-Feb-2018 1:20 PM 25-Feb-2018 B comments
Closed

Installation of PVC conduit for mechanical power system for first floor Approved w/
465 KHEP-EL-0465
at roof slab in cluster 35
Cluster 35 Zone 2B Division 26 22-Feb-2018 24-Feb-2018 1:30 PM 25-Feb-2018 B comments
Closed

Installation of PVC conduit for mechanical power system for roof Approved w/
466 KHEP-EL-0466
floor at roof slab in cluster 35
Cluster 35 Zone 2B Division 26 22-Feb-2018 24-Feb-2018 1:40 PM 25-Feb-2018 B comments
Closed
Installation of PVC conduit for power system for roof floor at roof Approved w/
467 KHEP-EL-0467
slab in cluster 35
Cluster 35 Zone 2B Division 26 22-Feb-2018 24-Feb-2018 1:50 PM 25-Feb-2018 B comments
Closed

Installation of 50 mm & 110mm PVC sleeves for grounding system


468 KHEP-EL-0468
and mechanical power at groun floor grade beam in cluster 28
Cluster 28 Zone 2B Division 26 22-Feb-2018 24-Feb-2018 8:50 AM 25-Feb-2018 A Approved Closed

Installation of blackout foam for conduit installation of panelboard at Approved w/


469 KHEP-EL-0469
ground floor grade beam in cluster 28
Cluster 28 Zone 2B Division 26 22-Feb-2018 24-Feb-2018 8:50 AM 25-Feb-2018 B comments
Closed

Installation of 110mm uPVC conduits for panel board & 32 mm uPVC Approved w/
470 KHEP-EL-0470
conduits for grounding system in Cluster 16 Zone 1B
Cluster 16 Zone 1B Division 26 24-Feb-2018 25-Feb-2018 8:00 AM 25-Feb-2018 B comments
Closed

Installation of 110mm uPVC conduits for panel board & 32 mm uPVC Approved w/
471 KHEP-EL-0471
conduits for grounding system in Cluster 21 Zone 1B
Cluster 21 Zone 1B Division 26 24-Feb-2018 25-Feb-2018 2:00 PM 25-Feb-2018 B comments
Closed

Installation of 110mm uPVC conduits for panel board & 32 mm uPVC Approved w/
472 KHEP-EL-0472
conduits for grounding system in Cluster 09 Zone 1B
Cluster 09 Zone 1B Division 26 24-Feb-2018 25-Feb-2018 2:10 PM 27-Feb-2018 B comments
Closed

Installation of PVC conduit for mechanical power system for roof


473 KHEP-EL-0473
floor at roof slab in cluster 23 Zone 1B
Cluster 23 Zone 1B Division 26 24-Feb-2018 25-Feb-2018 1:10 PM 25-Feb-2018 A Approved Closed

Installation of PVC conduit for mechanical power system for First Approved w/
474 KHEP-EL-0474
floor at roof slab in cluster 23 Zone 1B
Cluster 23 Zone 1B Division 26 24-Feb-2018 25-Feb-2018 1:20 PM 25-Feb-2018 B comments
Closed

Installation of PVC conduit forl power system for Roof floor at roof
475 KHEP-EL-0475
slab in cluster 23 Zone 1B
Cluster 23 Zone 1B Division 26 24-Feb-2018 25-Feb-2018 1:30 PM 25-Feb-2018 A Approved Closed

Installation of PVC conduit & box for lighting system for roof floor at
476 KHEP-EL-0476
roof slab in cluster 23 Zone 1B
Cluster 23 Zone 1B Division 26 24-Feb-2018 25-Feb-2018 1:40 PM 26-Feb-2018 A Approved Closed

Installation of PVC conduit & box for lighting system for First floor at
477 KHEP-EL-0477
roof slab in cluster 23 Zone 1B
Cluster 23 Zone 1B Division 26 24-Feb-2018 25-Feb-2018 1:50 PM 26-Feb-2018 A Approved Closed

Installation of PVC conduit & box for lighting system for First floor at
478 KHEP-EL-0478
roof slab in cluster 60 Zone 3B
Cluster 60 Zone 3B Division 26 24-Feb-2018 25-Feb-2018 9:00 AM 25-Feb-2018 A Approved Closed

Installation of PVC conduit & box for lighting system for Roof floor at
479 KHEP-EL-0479
roof slab in cluster 60 Zone 3B
Cluster 60 Zone 3B Division 26 24-Feb-2018 25-Feb-2018 9:10 AM 25-Feb-2018 A Approved Closed

Installation of pvc conduits for power system for Roof at Roof slab in
480 KHEP-EL-0480
Cluster 60 Zone 3B
Cluster 60 Zone 3B Division 26 24-Feb-2018 25-Feb-2018 9:20 AM 27-Feb-2018 A Approved Closed

Installation of PVC conduit for mechanical power system for Roof Approved w/
481 KHEP-EL-0481
floor at roof slab in cluster 16 Zone 3B
Cluster 60 Zone 3B Division 26 24-Feb-2018 25-Feb-2018 9:30 AM 25-Feb-2018 B comments
Closed

Installation of PVC conduit for mechanical power system for First


482 KHEP-EL-0482
floor at roof slab in cluster 60 Zone 3B
Cluster 60 Zone 3B Division 26 24-Feb-2018 25-Feb-2018 9:40 AM 25-Feb-2018 A Approved Closed

Installation of 50mm PVC sleeves for grounding system at ground


483 KHEP-EL-0483
floor Grade Beam in Cluster 67 Zone 4A
Cluster 67 Zone 4A Division 26 24-Feb-2018 25-Feb-2018 8:40 AM 25-Feb-2018 A Approved Closed

Installation of blackout foam at ground floor grade beam for PVC


484 KHEP-EL-0484 conduits installation for panelboard & mechanical power system at Cluster 67 Zone 4A Division 26 25-Feb-2018 26-Feb-2018 8:00 AM 28-Feb-2018 A Approved Closed
roof floor in Cluster 67 Zone 4A
Installation of PVC conduit & box for lighting system for ground floor Approved w/
485 KHEP-EL-0485
at first floor slab in Cluster 42 Zone 2B
Cluster 42 Zone 2B Division 26 25-Feb-2018 26-Feb-2018 8:00 AM 26-Feb-2018 B comments
Closed

Installation of pvc conduits for power system for first floor at first
486 KHEP-EL-0486
floor slab in Cluster 42 Zone 2B
Cluster 42 Zone 2B Division 26 25-Feb-2018 26-Feb-2018 8:10 AM 27-Feb-2018 A Approved Closed

Installation of PVC conduit for mechanical power system for ground Approved w/
487 KHEP-EL-0487
floor at first floor slab in Cluster 42 Zone 2B
Cluster 42 Zone 2B Division 26 25-Feb-2018 26-Feb-2018 8:20 AM 27-Feb-2018 B comments
Closed

Installation of pvc conduits for power system for ground floor at


488 KHEP-EL-0488 Cluster 16 Zone 1B Division 26 27-Feb-2018 28-Feb-2018 10:30 AM Open
ground floor slab in Cluster 16 Zone 1B
Installation of 110mm & 32mm uPVC conduits panelboard &
489 KHEP-EL-0489 Cluster 18 Zone 1B Division 26 27-Feb-2018 28-Feb-2018 8:30 AM Open
grounding system for ground floor in Cluster 18 Zone 1B
Installation of 110mm & 32mm uPVC conduits panelboard &
490 KHEP-EL-0490 Cluster 06 Zone 1B Division 26 27-Feb-2018 28-Feb-2018 1:30 PM Open
grounding system for ground floor in Cluster 06 Zone 1B
Installation of pvc conduits for power system for ground floor at
491 KHEP-EL-0491 Cluster 20 Zone 1B Division 26 27-Feb-2018 28-Feb-2018 8:30 AM Open
ground floor slab in Cluster 20 Zone 1B
Installation of outlet box for power system at ground & first floors in
492 KHEP-EL-0492 Cluster 15 Zone 1B Division 26 27-Feb-2018 28-Feb-2018 9:30 AM Open
Cluster 15 Zone 1B
Installation of EMT conduits & outlet box for lighting for ground &
493 KHEP-EL-0493 Cluster 15 Zone 1B Division 26 27-Feb-2018 28-Feb-2018 9:40 AM Open
first floors in Cluster 15 Zone 1B
Installation of EMT conduits & outlet box for FCU switch for ground &
494 KHEP-EL-0494 Cluster 15 Zone 1B Division 26 27-Feb-2018 28-Feb-2018 9:50 AM Open
first floors in Cluster 15 Zone 1B
Installation of blackout foam for PVC conduits installation for
495 KHEP-EL-0495 panelboard & mechanical power system at roof at ground floor grade Cluster 76 Zone 4B Division 26 28-Feb-2018 1-Mar-2018 8:00 AM
beam in Cluster 76 Zone 4B
Installation of 50mm PVC sleeves for grounding system at ground
496 KHEP-EL-0496 Cluster 76 Zone 4B Division 26 28-Feb-2018 1-Mar-2018 8:20 AM
floor grade beam in Cluster 76 Zone 4B
Installation of outlet box for power system for first floor at first floor
497 KHEP-EL-0497 Cluster 65 Zone 4A Division 26 28-Feb-2018 1-Mar-2018 8:30 AM
slab in Cluster 65 Zone 4A
Installation of PVC conduit & box for lighting system for ground floor
498 KHEP-EL-0498 Cluster 65 Zone 4A Division 26 28-Feb-2018 1-Mar-2018 1:30 PM
at first floor slab in Cluster 65 Zone 4A
Installation of PVC conduit & box for lighting system for ground floor
499 KHEP-EL-0499 Cluster 26 Zone 2B Division 26 28-Feb-2018 1-Mar-2018 1:40 PM
at first floor slab in Cluster 26 Zone 2B
Installation of outlet box for power system for first floor at first floor
500 KHEP-EL-0500 Cluster 26 Zone 2B Division 26 28-Feb-2018 1-Mar-2018 8:40 AM
slab in Cluster 26 Zone 2B
Installation of PVC conduit for mechanical power system for ground
501 KHEP-EL-0501 Cluster 26 Zone 2B Division 26 28-Feb-2018 1-Mar-2018 9:40 AM
floor at first floor slab in Cluster 26 Zone 2B
Installation of PVC conduit for mechanical power system for first floor
502 KHEP-EL-0502 Cluster 54 Zone 3B Division 26 28-Feb-2018 1-Mar-2018 9:10 AM
at roof floor slab in Cluster 54 Zone 3B
Installation of PVC conduit for mechanical power system for roof
503 KHEP-EL-0503 Cluster 54 Zone 3B Division 26 28-Feb-2018 1-Mar-2018 9:20 AM
floor at roof floor slab in Cluster 54 Zone 3B
Installation of outlet box for power system for roof floor at roof floor
504 KHEP-EL-0504 Cluster 54 Zone 3B Division 26 28-Feb-2018 1-Mar-2018 9:35 AM
slab in Cluster 54 Zone 3B
Installation of PVC conduit & box for lighting system for roof floor at
505 KHEP-EL-0505 Cluster 54 Zone 3B Division 26 28-Feb-2018 1-Mar-2018 2:35 PM
roof floor slab in Cluster 54 Zone 3B
Installation of PVC conduit & box for lighting system for first floor at
506 KHEP-EL-0506 Cluster 54 Zone 3B Division 26 28-Feb-2018 1-Mar-2018 2:00 PM
roof floor slab in Cluster 54 Zone 3B

HVAC
Installation of Ducting work supply return & fresh air with fiber glass
insulation & all accessories at ground floor & first floor Installation of
001 KHEP-HVAC-001
ducting work exhaust at ground floor & first floor Zone 4B Cluster 69
Cluster 69 Zone 4B Division 23 8-Jan-2018 9-Jan-2018 10:00 AM 11-Jan-2018 E Rejected Closed
Right Villa
Installation of Ducting work supply return & fresh air with fiber glass
insulation & all accessories at ground floor & first floor Installation of
002 KHEP-HVAC-001-01
ducting work exhaust at ground floor & first floor Zone 4B Cluster 69
Cluster 69 Zone 4B Division 23 17-Jan-2018 18-Jan-2018 10:00 AM 21-Jan-2018 E Rejected Closed
Right Villa

MECHANICAL
Installation of pipe sleeves for the penetration of plumbing pipes on Zone 4B / C-
001 KHEP-ME-001
beams 69(B2)
2-Apr-2017 3-Apr-2017 10:00 AM 4-Apr-2017 A Approved Closed

Installation of pipe sleeves and openings for the penetration of water Zone 4B / C-
002 KHEP-ME-002
supply, ducting, drainage and fire protection pipes on first floor slab 69(B2)
10-May-2017 11-May-2017 10:00 AM 13-May-2017 E Rejected Closed

Installation of pipe sleeves and openings for the penetration of water Zone 4B / C-
002.1 KHEP-ME-002-01
supply, ducting, drainage and fire protection pipes on first floor slab 69(B2)
14-May-2017 15-May-2017 10:00 AM 16-May-2017 A Approved Closed

Installation of Vertical and Horizontal pipe Sleeves for the


Zone 1A / C-
003 KHEP-ME-003 Penetration of Drainage, Water Supply and Fire Protection Pipes on
1(A6)
13-May-2017 14-May-2017 10:00 AM 15-May-2017 E Rejected Closed
Grid Beams
Installation of Horizontal Pipe Sleeves for the Penetratoin of Water Zone 1A / C-
003.1 KHEP-ME-003-01
Supply on Grid Beams 1(A6)
16-May-2017 17-May-2017 10:00 AM 18-May-2017 A Approved Closed

Installation of Pipe for the Penetration of Fire Protection Pipes on Zone 4B / C- Approved w/
004 KHEP-ME-004
First Floor Slab 69(B2)
14-May-2017 15-May-2017 10:00 AM 16-May-2017 B comments
Closed

Zone 4B / C-
005 KHEP-ME-005 Fixing of Block- outs for the Openings for Ducts on First Floor Slab
69(B2)
14-May-2017 15-May-2017 10:00 AM 16-May-2017 A Approved Closed

Installation of Horizontal Pipe Sleeves for the Penetration of Water Zone 1B / C-


006 KHEP-ME-006
Supply on Grid Beams 2(A6)
18-May-2017 20-May-2017 10:00 AM 21-May-2017 A Approved Closed

Main Line:
From MH1-
L04 ~ MH1-
Inspection of Gravity Test for Sanitary Sewer uPVC Pipes 200mm -
007 KHEP-ME-007
Class 4
L05 Main 20-May-2017 21-May-2017 11:00 AM 23-May-2017 A Approved Closed
Line: From
MH1-L05 ~
MH2-L05
Main Line:
From MH1-
L03 ~ MH1-
L04 (Line #
4) Main Line:
From MH1-
Inspection of Gravity Test for Sanitary Sewer uPVC Pipes 200mm -
008 KHEP-ME-008
Class 4
L04 ~ MH2- 20-May-2017 21-May-2017 11:00 AM 23-May-2017 A Approved Closed
L04 (Line #
4) Main Line:
From MH1-
L03 ~ MH1A-
L03 (Line #
3)

Main Line:
From MH4-
009 KHEP-ME-009 Inspection of Sanitary Sewer uPVC Pipes 200mm - Class 4 L08 ~ MH3- 20-May-2017 21-May-2017 10:30 AM 23-May-2017 A Approved Closed
L08 Length
(9.75m)

Main Line:
From MH2-
L34 ~ MH1-
L34 Length
(13.60m)
Main Line:
From MH1-
010 KHEP-ME-010 Inspection of Sanitary Sewer uPVC Pipes 200mm - Class 4 L34 ~ MHA1- 21-May-2017 22-May-2017 3:00 PM 23-May-2017 A Approved Closed
L34 Length
(22.41m)
Main Line:
From MHA1-
L34 ~ MH7-
L02 Length
(19.74m)

Main Line:
From MH1-
Inspection of Gravity Test for Sanitary Sewer uPVC Pipes 200mm -
011 KHEP-ME-011
Class 4
L08 ~ MH7- 22-May-2017 23-May-2017 11:00 AM 25-May-2017 A Approved Closed
L01 (Line #
8)

Main Line:
From MH3-
L03 ~ MH2-
L03 (Line 3)
Main Line:
Inspection of Gravity Test for Sanitary Sewer uPVC Pipes 200mm - From MH2-
012 KHEP-ME-012
Class 4 L03 ~ MH1-
22-May-2017 23-May-2017 11:00 AM 25-May-2017 A Approved Closed
L03 (Line 3)
Main Line:
From MHA1-
L03 ~ MH5-
L01 (Line 3)

Main Line:
From MH1-
L33 ~ MHA1-
L33 Length
(21.60m)
013 KHEP-ME-013 Installation of Sanitary Sewer uPVC Pipes 200mm - Class 4
Main Line:
23-May-2017 24-May-2017 11:00 AM 25-May-2017 A Approved Closed
From MHA1-
L33 ~ MH1-
L34 Length
(13.75m)
Main Line:
From MH2-
L34 ~ MH1-
L34 (Line 34)
Main Line:
Inspection of Gravity Test for Sanitary Sewer uPVC Pipes 200mm - From MH1-
014 KHEP-ME-014
Class 4 L34 ~ MHA1-
23-May-2017 24-May-2017 11:00 AM 25-May-2017 A Approved Closed
L34 (Line 34)
Main Line:
From MHA1-
L34 ~ MH7-
L02 (Line 34)

Main Line:
From MH1-
L33 ~ MHA1-
Inspection of Gravity Test for Sanitary Sewer uPVC Pipes 200mm - L33 (Line 33)
015 KHEP-ME-015
Class 4 Main Line:
24-May-2017 25-May-2017 11:00 AM 27-May-2017 A Approved Closed
From MHA1-
L34 ~ MH1-
L34 (Line 34)

Main Line:
From MH19-
016 KHEP-ME-016 Installation of Storm Drainage GRP Pipes 500mm L07 ~ MH20- 29-May-2017 30-May-2017 11:00 AM 30-May-2017 A Approved Closed
L07 (Length
59m)

Line 7
(Length
017 KHEP-ME-017 Inspect the Installation lay - out GRP Pipes 500mm 58.061Met) 30-May-2017 31-May-2017 9:30 AM 31-May-2017 A Approved Closed
MH20 L07 to
MH 27 L07

Main Line:
From MH54-
018 KHEP-ME-018 Installation of Storm Drainage GRP Pipes 600mm L15 ~ MH57- 1-Jun-2017 3-Jun-2017 10:30 AM 3-Jun-2017 A Approved Closed
L15 (Length
38.70m)

Main Line:
From MH52-
019 KHEP-ME-019 Installation of Storm Drainage GRP Pipes 500mm L15 ~ MH54- 1-Jun-2017 3-Jun-2017 10:30 AM 3-Jun-2017 A Approved Closed
L15 (Length
51.64m)
Main Line:
From MH3-
L31~ MH2-
L31 Length
(18.32m)
Main Line:
From MH2-
L31 ~ MH1-
L31 Length
(31.49m)
020 KHEP-ME-020 Installation of Sanitary Sewer uPVC Pipes 200mm - Class 4
Main Line:
5-Jun-2017 6-Jun-2017 11:00 AM 7-Jun-2017 A Approved Closed
From MH1-
L31~ MHA1-
L31 Length
(20.1m) Main
Line: From
MHA1-L31 ~
MH9-L02
Length
(22.1m)

Main Line:
From MH1-
021 KHEP-ME-021 Installation of Sanitary Sewer uPVC Pipes 200mm - Class 4 L32~ MH1- 5-Jun-2017 6-Jun-2017 11:00 AM 7-Jun-2017 A Approved Closed
L31 Length
(14.38m)

Main Line:
From MH29-
L07~ MH29a-
L07 Length
(20.37m)
022 KHEP-ME-002 Installation of Storm Drainage GRP Pipes 800mm
Main Line:
5-Jun-2017 6-Jun-2017 10:30 AM 8-Jun-2017 A Approved Closed
From MH29a-
L07~ MH30-
L04 Length
(17.77m)

Main Line:
From MH46-
023 KHEP-ME-023 Installation of Storm Drainage GRP Pipes 500mm L15~ MH47- 6-Jun-2017 7-Jun-2017 10:30 AM 8-Jun-2017 A Approved Closed
L15 Length
(43.71m)

Line 31 MH9-
L02 to MHA1-
L31 and
MH1-L31 to
Inspection of Gravity Test for Sanitary Sewer uPVC Pipes 200mm -
024 KHEP-ME-024
Class 4
MH1A-L31 10-Jun-2017 11-Jun-2017 9:30 AM 12-Jun-2017 A Approved Closed
MH2-L31 to
MH1-L31 and
MH1-L32 to
MH1-L31

Site Store
025 KHEP-ME-025 Inspection of GRP Sanitary Swear Manhole Sample
Area
10-Jun-2017 11-Jun-2017 9:00 AM 11-Jun-2017 E Rejected Closed

Zone
Installation of Horizontal Pipe Sleeves for the Penetration of
026 KHEP-ME-026
Drainage and Water Supply Piping on Grade Beams
1B,Cluster 10-Jun-2017 11-Jun-2017 10:00 AM 12-Jun-2017 A Approved Closed
13, B2
Zone
Installation of Horizontal Pipe Sleeves for the Penetration of
027 KHEP-ME-027
Drainage and Water Supply Piping on Grade Beams
1B,Cluster 10-Jun-2017 11-Jun-2017 10:00 AM 12-Jun-2017 A Approved Closed
15, B2
Zone
Installation of Vertical Pipe Sleeves for the Penetration of Vent,
028 KHEP-ME-028
Condensate, and Rainwater Drainage on Roof Floor
4B,Cluster 12-Jun-2017 13-Jun-2017 10:00 AM 13-Jun-2017 A Approved Closed
69, B2
Zone
029 KHEP-ME-029 Fixing of Block- outs for the Openings for Air Ducts on Roof Floor 4B,Cluster 12-Jun-2017 13-Jun-2017 10:00 AM 13-Jun-2017 A Approved Closed
69, B2
Zone
Installation of Horizontal Pipe Sleeves for the Penetration of
030 KHEP-ME-030
Drainage and Water Supply Piping on Grade Beams
1B,Cluster 13-Jun-2017 14-Jun-2017 10:00 AM 14-Jun-2017 A Approved Closed
12, B2
Zone
Installation of Horizontal Pipe Sleeves for the Penetration of
031 KHEP-ME-031
Drainage and Water Supply Piping on Grade Beams
1B,Cluster 13-Jun-2017 14-Jun-2017 10:15 AM 14-Jun-2017 A Approved Closed
14, B2

Main Line:
From MH28-
032 KHEP-ME-032 Installation of Storm Drainage GRP Pipes 700mm L07 ~ MH29- 15-Jun-2017 17-Jun-2017 10:30 AM 17-Jun-2017 A Approved Closed
L07 (Length
45m)

Main Line:
From MH21-
L01~ MH20-
L01 Length
(32.65m)
033 KHEP-ME-033 Installation of Sanitary Sewer uPVC Pipes 200mm - Class 4
Main Line:
15-Jun-2017 17-Jun-2017 11:00 AM 17-Jun-2017 A Approved Closed
From MH20-
L01~ MH19-
L01 Length
(27.122m)

Main Line:
Inspection of Gravity Test for Sanitary Sewer uPVC Pipes 200mm - From MH3-
034 KHEP-ME-034
Class 4 L31~ MH2-
17-Jun-2017 18-Jun-2017 9:00 AM 19-Jun-2017 A Approved Closed
L31, Line 31

Main Line:
From MH19-
L01~ MH18-
L01 Length
(33.33m)
035 KHEP-ME-035 Installation of Sanitary Sewer uPVC Pipes 200mm - Class 4
Main Line:
17-Jun-2017 18-Jun-2017 10:30 AM 19-Jun-2017 A Approved Closed
From MH18-
L01~ MH17-
L01 Length
(38.819m)

Main Line:
From MH21-
L01~ MH20-
L01 Line 1
Main Line:
From MH20-
L01~ MH19-
Inspection of Gravity Test for Sanitary Sewer uPVC Pipes 200mm - L01 Line 1
036 KHEP-ME-036
Class 4 Main Line:
19-Jun-2017 20-Jun-2017 9:30 AM 22-Jun-2017 A Approved Closed
From MH19-
L01~ MH18-
L01 Line 1
Main Line:
From MH18-
L01~ MH17-
L01 Line 1
Main Line:
From MH114-
L27~
MH111a-L27
Length
(11.79m)
Main Line:
From
MH111a-
037 KHEP-ME-037 Installation of Storm Drainage GRP Pipes 700mm
L27~ MH111-
19-Jun-2017 20-Jun-2017 10:30 AM 22-Jun-2017 E Rejected Closed
L27 Length
(43.48m)
Main Line:
From MH111-
L27~
MH110a-L27
Length
(49.886m)

Line 27, Main


Line: From
MH114-L27~
MH111a-L27
Length
(11.79m)
Main Line:
From
MH111a- Approved w/
037.1 KHEP-ME-037-01 Installation of Storm Drainage GRP Pipes 700mm
L27~ MH111-
28-Jun-2017 29-Jun-2017 10:30 AM 29-Jun-2017 B comments
Closed
L27 Length
(43.48m)
Main Line:
From MH111-
L27~
MH110a-L27
Length
(49.886m)

Zone 4B,
Installation of Horizontal Pipe Sleeves for the Penetration of
038 KHEP-ME-038
Drainage and Water Supply Piping on Grade Beams
Cluster 68, 28-Jun-2017 29-Jun-2017 10:00 AM 29-Jun-2017 A Approved Closed
B2

Main Line:
From MH17-
L01~ MH16-
L01 Length
(38.96m) Approved w/
039 KHEP-ME-039 Installation of Sanitary Sewer uPVC Pipes 200mm - Class 4
Main Line:
28-Jun-2017 29-Jun-2017 3:00 PM 29-Jun-2017 B comments
Closed
From MH16-
L01~ MH15-
L01 Length
(64.516m)

Line 27, Main


Line: From
MH110A- Approved w/
040 KHEP-ME-040 Installation of Storm Drainage GRP Pipes 700mm
L27~ MH108-
28-Jun-2017 29-Jun-2017 10:30 AM 29-Jun-2017 B comments
Closed
L27 Length
(38.81m)
Zone 2B,
Installation of Horizontal Pipe Sleeves for the Penetration of
041 KHEP-ME-041
Drainage and Water Supply Piping on Grade Beams
Cluster 11, 29-Jun-2017 1-Jul-2017 10:00 AM 4-Jul-2017 A Approved Closed
B2
Main Line:
From MH3-
L09~ MH2-
042 KHEP-ME-042 Installation of Sanitary Sewer uPVC Pipes 200mm - Class 4 L09 Main 29-Jun-2017 1-Jul-2017 3:00 PM 1-Jul-2017 A Approved Closed
Line: From
MH2-L09~
MH1-L09
Zone 2B,
Installation of Horizontal Pipe Sleeves for the Penetration of
043 KHEP-ME-043
Drainage and Water Supply Piping on Grade Beams
Cluster 10, 1-Jul-2017 2-Jul-2017 10:00 AM 4-Jul-2017 A Approved Closed
B2

Main Line:
From MH17-
L01~ MH16-
Inspection of Gravity Test for Sanitary Sewer uPVC Pipes 200mm - L01 Line 1
044 KHEP-ME-044
Class 4 Main Line:
1-Jul-2017 2-Jul-2017 10:30 AM 3-Jul-2017 A Approved Closed
From MH16-
L01~ MH15-
L01 Line 1

Line 9 & 10,


Main Line:
From MH1-
L09~ MH1a-
L09 Main
Line: From
MH1a-L09~
045 KHEP-ME-045 Installation of Sanitary Sewer uPVC Pipes 200mm - Class 4 MH9-L01 1-Jul-2017 2-Jul-2017 3:00 PM 3-Jul-2017 A Approved Closed
Main Line:
From MH1-
L10~ MH1a-
L10 Main
Line: From
MH1a-L10~
MH1-L09

Installation of Storm Drainage GRP Pipes 700mm , 500mm & 400mm

Line 7, Main Line: From MH28-L07 ~ MH27-L07 (700mm) Approved w/


046 KHEP-ME-046
Main Line: From MH27-L07 ~ MH26a-L08 (500mm) Main Line: From
Line 7 NA Division 33 2-Jul-2017 3-Jul-2017 10:30 AM 4-Jul-2017 B comments
Closed
MH26a-L08 ~ MH26-L08 (500mm) Main Line: From MH26-L08 ~
MH21-L08 (400mm)
Installation of Storm Drainage GRP Pipes 700mm , 500mm & 400mm

Line 7, Main Line: From MH28-L07 ~ MH27-L07 (700mm)


046.1 KHEP-ME-046-01
Main Line: From MH27-L07 ~ MH26a-L08 (500mm) Main Line: From
Line 7 NA Division 33 8-Jul-2017 9-Jul-2017 10:30 AM 9-Jul-2017 A Approved Closed
MH26a-L08 ~ MH26-L08 (500mm) Main Line: From MH26-L08 ~
MH21-L08 (400mm)
Installation of Sanitary Sewer uPVC Pipes 200mm - Class 4

047 KHEP-ME-047 Line 2, Main Line: From MH22-L02~ MH21-L02 and Main Line 2 NA Division 33 3-Jul-2017 4-Jul-2017 3:00 PM 4-Jul-2017 A Approved Closed
Line: From MH21-L02~ MH20-L02 and Main Line: From MH20-L02~
MH19-L02
Installation of Sanitary Sewer uPVC Pipes 200mm - Class 4

Line 2, Main Line: From MH19-L02~ MH18-L02 and Main


048 KHEP-ME-048
Line: From MH18-L02~ MH17-L02 and Main Line: From MH17-L02~
Line 2 NA Division 33 4-Jul-2017 5-Jul-2017 10:30 AM 5-Jul-2017 A Approved Closed
MH16-L02 and Main Line: From MH16-L02~ MH15-L02 and Main
Line: From MH15-L02~ MH14-L02

Installation of Horizontal Pipe Sleeves for the Penetration of


Division 22 &
049 KHEP-ME-049 Drainage, Water Supply and Shaft Openings Cluster 01 A6 Zone 1A
23
5-Jul-2017 6-Jul-2017 10:00 AM 8-Jul-2017 A Approved Closed
Zone 1A, Cluster 1, A6
Inspection of Gravity Test for Sanitary Sewer uPVC Pipes 200mm -
Class 4
Line 9 & 10, Main Line: From MH3-L09~ MH2-L09 and Main Line: Approved w/
050 KHEP-ME-050
From MH2-L09~ MH1-L09 and Main Line: From MH1-L09~ MH1a-
Line 9 & 10 NA Division 33 5-Jul-2017 6-Jul-2017 8:30 AM 10-Jul-2017 B comments
Closed
L09 and Main Line: From MH1-L10~ MH1a-L10 and Main Line: From
MH1a-L10~ MH1-L09
Inspection of Gravity Test for Sanitary Sewer uPVC Pipes 200mm -
051 KHEP-ME-051 Class 4 Line 9 NA Division 33 8-Jul-2017 9-Jul-2017 8:30 AM 9-Jul-2017 A Approved Closed
Line 9 , Main Line: From MH1a-L09~ MH9-L01

Inspection of Gravity Test for Sanitary Sewer uPVC Pipes 200mm -


Class 4
052 KHEP-ME-052 Line 2, Main Line: From MH22-L02~ MH21-L02 and Main Line: Line 2 NA Division 33 8-Jul-2017 9-Jul-2017 9:30 AM 9-Jul-2017 A Approved Closed
From MH21-L02~ MH20-L02 and Main Line: From MH20-L02~
MH19-L02 and Main Line: From MH19-L02~ MH18-L02

Installation of Horizontal Pipe Sleeves for the Penetration of


Drainage and Water Supply Piping on Grade Beams Ground Floor
053 KHEP-ME-053
Zone
Cluster 5, B2 Zone 1B Division 22 10-Jul-2017 11-Jul-2017 10:00 AM 12-Jul-2017 A Approved Closed
1B, Cluster 5, B2
Inspection for the Location of Fire Protection Riser Pipe within Shaft
054 KHEP-ME-054 Opening on the First Floor Zone 1A, Cluster 01 A6 Zone 1A Division 21 10-Jul-2017 11-Jul-2017 10:30 AM 12-Jul-2017 A Approved Closed
Cluster 1, A6
Installation of Storm Drainage GRP Pipes 500mm & 600mm

055 KHEP-ME-055 Line 7, Main Line: From MH62-L18 ~ MH63-L18 (500mm) Main Line: Line 18 NA Division 33 10-Jul-2017 11-Jul-2017 10:00 AM 12-Jul-2017 A Approved Closed
From MH63-L18 ~ MH64-L18 (500mm) Main Line: From MH64-L18 ~
MH74-L18 (600mm)

Installation of Gravity Test for Sanitary Sewer uPVC Pipes 200mm -


Class 4
056 KHEP-ME-056 Line 2, Main Line: From MH18-L02~ MH17-L02 and Main Line 2 NA Division 33 11-Jul-2017 12-Jul-2017 9:30 AM 13-Jul-2017 E Rejected Closed
Line: From MH17-L02~ MH16-L02 and Main Line: From MH16-L02~
MH15-L02 and Main Line: From MH15-L02~ MH14-L02

Installation of Gravity Test for Sanitary Sewer uPVC Pipes 200mm -


Class 4
056.1 KHEP-ME-056-01 Line 2, Main Line: From MH18-L02~ MH17-L02 and Main Line: Line 2 NA Division 33 13-Jul-2017 15-Jul-2017 9:30 AM 15-Jul-2017 A Approved Closed
From MH17-L02~ MH16-L02 and Main Line: From MH16-L02~
MH15-L02 and Main Line: From MH15-L02~ MH14-L02

Installation of Sanitary Sewer uPVC Pipes 200mm - Class 4

Zone 2B, Line 30 & 29, Main Line: From MH3-L30~ MH2- Approved w/
057 KHEP-ME-057
L30 and Main Line: From MH2-L30~ MH1-L30 and Main Line: From
Line 30 & 29 Zone 2B Division 33 12-Jul-2017 12-Jul-2017 11:00 AM 15-Jul-2017 B comments
Closed
MH1-L30~ MH1a-L30 and MH1a-L30~ MH11-L02 and MH1-L29~
MH1a-L29 and MH1a-L29~ MH1-L30
Installation of Storm Drainage GRP Pipes 500mm Line
058 KHEP-ME-058 22, Main Line: From MH89-L22 ~ MH90-L22 (500mm) Main Line: Line 22 NA Division 33 13-Jul-2017 15-Jul-2017 10:00 AM 15-Jul-2017 E Rejected Closed
From MH90-L18 ~ MH91-L18 (500mm)
Installation of Storm Drainage GRP Pipes 500mm Line
Approved w/
058.1 KHEP-ME-058-01 22, Main Line: From MH89-L22 ~ MH90-L22 (500mm) Main Line: Line 22 NA Division 33 16-Jul-2017 17-Jul-2017 10:00 AM 18-Jul-2017 B comments
Closed
From MH90-L22 ~ MH91-L22 (500mm)
Installation of Sanitary Sewer uPVC Pipes 200mm - Class 4

Zone 2B, Line 12 & 11, Main Line: From MH3-L12~ MH2-
059 KHEP-ME-059
L12 and Main Line: From MH2-L12~ MH1-L12 and Main Line: From
Line 12 & 11 Zone 2B Division 33 15-Jul-2017 16-Jul-2017 3:00 PM 17-Jul-2017 A Approved Closed
MH1-L12~ MH12-L01 and MH1-L11~ MH1a-L11 and MH1a-L11~
MH2-L12
Installation of Storm Drainage GRP Pipes 400mm Line
060 KHEP-ME-060
10, Main Line: From MH31-L10 ~ MH32-L10 (400mm)
Line 10 NA Division 33 15-Jul-2017 16-Jul-2017 10:00 AM 17-Jul-2017 A Approved Closed

Inspection of Gravity Test for Sanitary Sewer uPVC Pipes 200mm -


Class 4
061 KHEP-ME-061 Line 30 & 29, Main Line: From MH-3-L30~ MH-2-L30 and Main Line 30 & 29 NA Division 33 16-Jul-2017 17-Jul-2017 9:30 AM 18-Jul-2017 A Approved Closed
Line: From MH-2-L30~ MH-1-L30 and Main Line: From MH-1-L29~
MH-1a-L29 and Main Line: From MH-1a-L29~ MH-1-L30
Installation of Storm Drainage GRP Pipes 400mm Line
Approved w/
062 KHEP-ME-062 1, Main Line: From MH-3-L01 ~ MH-6-L01 (400mm) Main Line: From Line 1 NA Division 33 16-Jul-2017 17-Jul-2017 11:15 AM 18-Jul-2017 B comments
Closed
MH-6-L01 ~ MH-132-L35 (400mm)
Installation of Storm Drainage GRP Pipes 600mm Line
Approved w/
063 KHEP-ME-063 22, Main Line: From MH-91-L22 ~ MH-91a-L22 (600mm) Main Line: Line 22 NA Division 33 17-Jul-2017 18-Jul-2017 11:15 AM 19-Jul-2017 B comments
Closed
From MH-91a-L22 ~ MH-92-L22 (600mm)

Installation of Sanitary Sewer uPVC Pipes 200mm - Class 4


Approved w/
064 KHEP-ME-064 Line 17 Zone 4B Division 33 17-Jul-2017 18-Jul-2017 3:00 PM 19-Jul-2017 B comments
Closed
Zone 4B, Line 17, Main Line: From MH-1-L17~ MH-17-L01

Installation of Sanitary Sewer uPVC Pipes 200mm - Class 4

Zone 2B, Line 27 & 28, Main Line: From MH-5-L27~ MH-
Approved w/
065 KHEP-ME-065 4-L27 and MH-4-L27~ MH-3-L27 and Main Line: From MH-3-L27~ Line 27 & 28 Zone 2B Division 33 17-Jul-2017 18-Jul-2017 3:00 PM 19-Jul-2017 B comments
Closed
MH-2-L27 and MH-2-L27~ MH-1-L27 and MH-1-L27~ MH-13-L02
and Main Line: From MH-1-L28~ MH-1a-L28 and MH-1a-L28~ MH-2-
L27
Inspection of Gravity Test for Sanitary Sewer uPVC Pipes 200mm -
Class 4
066 KHEP-ME-066
Line 30, Main Line: From MH-1-L30~ MH-1a-L30 and Main Line:
Line 30 NA Division 33 18-Jul-2017 19-Jul-2017 9:30 AM 20-Jul-2017 E Rejected Closed
From MH-1a-L30~ MH-11-L02
Inspection of Gravity Test for Sanitary Sewer uPVC Pipes 200mm -
Class 4
066.1 KHEP-ME-066-01
Line 30, Main Line: From MH-1-L30~ MH-1a-L30 and Main Line:
Line 30 NA Division 33 20-Jul-2017 22-Jul-2017 9:30 AM 23-Jul-2017 A Approved Closed
From MH-1a-L30~ MH-11-L02
Inspection of Gravity Test for Sanitary Sewer uPVC Pipes 200mm -
Class 4
067 KHEP-ME-067 Line 11 & 12, Main Line: From MH-1-L11~ MH-1a-L11 and Main Line 11 & 12 NA Division 33 18-Jul-2017 19-Jul-2017 9:30 AM 20-Jul-2017 E Rejected Closed
Line: From MH-1a-L11~ MH-12-L12 and Main Line: From MH-3-
L12~ MH-2-L12
Inspection of Gravity Test for Sanitary Sewer uPVC Pipes 200mm -
Class 4
067.1 KHEP-ME-067-01 Line 11 & 12, Main Line: From MH-1-L11~ MH-1a-L11 and Main Line 11 & 12 NA Division 33 20-Jul-2017 22-Jul-2017 9:30 AM 23-Jul-2017 A Approved Closed
Line: From MH-1a-L11~ MH-12-L12 and Main Line: From MH-3-
L12~ MH-2-L12

Installation of Horizontal Pipe Sleeves at the Ground floor Structural


Beam, and Vertical pipe sleeves at First floor Structural slab for the Division 22 &
068 KHEP-ME-068
pentration of Drainage, Water supply and Mechanical Openings
Cluster 02 A6 Zone 1A
23
19-Jul-2017 20-Jul-2017 10:00 AM 22-Jul-2017 A Approved Closed
Zone 1A, Cluster 2, A6

Installation of Horizontal Pipe Sleeves for the Penetration of


Drainage, Water Supply piping on Grade Beams Ground floor
069 KHEP-ME-069
Zone
Cluster 17 B2 Zone 1B Division 22 19-Jul-2017 20-Jul-2017 10:30 AM 22-Jul-2017 A Approved Closed
1B, Cluster 17, B2
Installation of Storm Drainage GRP Pipes 400mm Line
30, Main Line: From MH-106-L30 ~ MH-107-L30 (400mm) Main Line:
070 KHEP-ME-070
From MH-107-L30 ~ MH-107a-L30 (400mm) Main Line: From MH-
Line 30 NA Division 33 19-Jul-2017 20-Jul-2017 11:15 AM 22-Jul-2017 A Approved Closed
107a-L30 ~ MH-108-L27 (400mm)
Installation of Storm Drainage GRP Pipes 400mm Line
071 KHEP-ME-071 33, Main Line: From MH-133-L11 ~ MH-134-L11 (400mm) Main Line: Line 33 NA Division 33 22-Jul-2017 23-Jul-2017 11:15 AM 24-Jul-2017 A Approved Closed
From MH-134-L11 ~ MH-37-L11 (400mm)

Installation of Vertical Pipe Sleeves for the Penetration of Drainage


Division 22 &
072 KHEP-ME-072 and Water Supply Piping Mechanical Openings at First Floor Cluster 15 B2 Zone 1B
23
23-Jul-2017 24-Jul-2017 10:00 AM 27-Jul-2017 A Approved Closed
Zone 1B, Cluster 15, B2

Inspection of Gravity Test for Sanitary Sewer uPVC Pipes 200mm -


Class 4
073 KHEP-ME-073
Line 12, Main Line: From MH-2-L12~ MH-1-L12 and Main Line:
Line 12 NA Division 33 23-Jul-2017 24-Jul-2017 11:30 AM 25-Jul-2017 A Approved Closed
From MH-1-L12~ MH-12-L01
Inspection of Gravity Test for Sanitary Sewer uPVC Pipes 200mm -
074 KHEP-ME-074 Class 4 Line 17 NA Division 33 23-Jul-2017 24-Jul-2017 11:30 AM 25-Jul-2017 E Rejected Closed
Line 17, Main Line: From MH-1-L17~ MH-17-L01
Inspection of Gravity Test for Sanitary Sewer uPVC Pipes 200mm -
074.1 KHEP-ME-074-01 Class 4 Line 17 NA Division 33 25-Jul-2017 26-Jul-2017 11:30 AM 27-Jul-2017 A Approved Closed
Line 17, Main Line: From MH-1-L17~ MH-17-L01
Installation of Vertical Pipe Sleeves for the Penetration of Vent Pipes
at the Stair landing Area Between Ground and First Floor
075 KHEP-ME-075
Zone 1B, Cluster
Cluster 13 B2 Zone 1B Division 22 23-Jul-2017 24-Jul-2017 10:30 AM 26-Jul-2017 A Approved Closed
13, B2
Installation of Vertical Pipe Sleeves for the Penetration of Vent Pipes
at the Stair landing Area Between Ground and First Floor
076 KHEP-ME-076
Zone 4B, Cluster
Cluster 68, B2 Zone 4B Division 22 23-Jul-2017 24-Jul-2017 10:45 AM 26-Jul-2017 A Approved Closed
68, B2
Installation of Sanitary Sewer uPVC Pipes 200mm - Class 4
Approved w/
077 KHEP-ME-077 Zone 2B, Line 1, Main Line: From MH-14-L01~ MH-13-L01 Line 1 Zone 2B Division 33 24-Jul-2017 25-Jul-2017 11:00 AM 26-Jul-2017 B comments
Closed
and MH-13-L01~ MH-12-L01 and Main Line: From MH-12-L01~ MH-
11-L01

Inspection of Gravity Test for Sanitary Sewer uPVC Pipes 200mm -


Class 4
078 KHEP-ME-078 Line 27, Main Line: From MH-5-L27~ MH-4-L27 and Main Line: Line 27 NA Division 33 25-Jul-2017 26-Jul-2017 11:30 AM 27-Jul-2017 E Rejected Closed
From MH-4-L27~ MH-3-L27 and Main Line: From MH-3-L27~ MH-2-
L27 and Main Line: From MH-2-L27~ MH-1-L27 and

Inspection of Gravity Test for Sanitary Sewer uPVC Pipes 200mm -


Class 4
078.1 KHEP-ME-078-01 Line 27, Main Line: From MH-5-L27~ MH-4-L27 and Main Line: Line 27 NA Division 33 27-Jul-2017 29-Jul-2017 11:30 AM 30-Jul-2017 A Approved Closed
From MH-4-L27~ MH-3-L27 and Main Line: From MH-3-L27~ MH-2-
L27 and Main Line: From MH-2-L27~ MH-1-L27 and

Installation of Sanitary Sewer uPVC Pipes 200mm - Class 4

079 KHEP-ME-079 Zone 2B, Line 2, Main Line: From MH-14-L02~ MH-13-L02 Line 2 Zone 2B Division 33 25-Jul-2017 26-Jul-2017 11:00 AM 27-Jul-2017 E Rejected Closed
and MH-13-L02~ MH-12-L02 and Main Line: From MH-12-L02~ MH-
11-L02
Installation of Sanitary Sewer uPVC Pipes 200mm - Class 4

079.1 KHEP-ME-079-01 Zone 2B, Line 2, Main Line: From MH-14-L02~ MH-13-L02 Line 2 Zone 2B Division 33 27-Jul-2017 29-Jul-2017 11:00 AM 30-Jul-2017 A Approved Closed
and MH-13-L02~ MH-12-L02 and Main Line: From MH-12-L02~ MH-
11-L02
Installation of Vertical Pipe Sleeves for the Penetration of Vent Pipes
at the Stair landing Area Between Ground and First Floor
080 KHEP-ME-080
Zone 1B, Cluster
Cluster 14 B2 Zone 1B Division 22 26-Jul-2017 27-Jul-2017 10:00 AM 27-Jul-2017 A Approved Closed
14, B2
Installation of Sanitary sewer uPVC Pipes 200mm - Class 4
Approved w/
081 KHEP-ME-081 Line 2, Line 2 Zone 2B Division 33 26-Jul-2017 27-Jul-2017 3:00 PM 27-Jul-2017 B comments
Closed
MH-11-L02 - MH-10-L02 and MH-10-L02 - MH-9-L02
Inspection of Gravity Test for Sanitary Sewer uPVC Pipes 200mm -
Class 4
Approved w/
082 KHEP-ME-082 Line 27 & 28, Main Line: From MH-1-L27~ MH-13-L02 and Main Line 27 & 28 NA Division 33 29-Jul-2017 30-Jul-2017 11:00 AM 31-Jul-2017 B comments
Closed
Line: From MH-1-L28~ MH-1a-L28 and Main Line: From MH-1a-L28~
MH-2-L27
Installation of Storm Drainage GRP pipes 400mm
Line 13, Main Line: From Approved w/
083 KHEP-ME-083
MH-I39-L13~ MH-I40-L13 and Main Line: From MH-I40-L13~ MH-
Line 13 NA Division 33 29-Jul-2017 30-Jul-2017 3:15 PM 31-Jul-2017 B comments
Closed
I41-L13
Installation of Sanitary sewer uPVC Pipes 200mm - Class 4
Zone 2B,
Approved w/
084 KHEP-ME-084 Line 1, Main Line: from MH-11-L01 - MH-10-L01 and Main Line: Line 1 Zone 2B Division 33 30-Jul-2017 31-Jul-2017 11:00 AM 1-Aug-2017 B comments
Closed
from MH-10-L01 - MH-9-L01 and Main Line: from MH-9-L01 - MH-8-
L01
Inspection of Gravity Test for Sanitary Sewer uPVC Pipes 200mm -
Class 4
Line 2, Main Line: From MH-14-L02~ MH-13-L02 and Main Line: Approved w/
085 KHEP-ME-085
From MH-13-L02~ MH-12-L02 and Main Line: From MH-12-L02~
Line 2 NA Division 33 31-Jul-2017 1-Aug-2017 11:00 AM 2-Aug-2017 B comments
Closed
MH-11-L02 and Main Line: From MH-11-L02~ MH-10-L02 and MH-
10-L02~ MH-09-L02
Installation of Storm Drainage GRP pipes 400mm
Line 13, Main Line: From Approved w/
086 KHEP-ME-086
MH-I41-L13~ MH-I42-L13 400mm and Main Line: From MH-I42-
Line 13 NA Division 33 31-Jul-2017 1-Aug-2017 3:15 PM 2-Aug-2017 B comments
Closed
L13~ MH-45-L13 400mm
Installation of Vertical Pipe Sleeves for the Penetration of Drainage
and Water supply piping, Mechanical Openings at First Floor Division 22 &
087 KHEP-ME-087
Zone
Cluster 13 B2 Zone 1B
23
1-Aug-2017 2-Aug-2017 10:00 AM 3-Aug-2017 A Approved Closed
1B, Cluster 13, B2
Installation of Vertical Pipe Sleeves for the Penetration of Vent Pipes
at the Stair landing Area Between Ground and First Floor
088 KHEP-ME-088
Zone 1B,
Cluster 12 B2 Zone 1B Division 22 1-Aug-2017 2-Aug-2017 10:15 AM 3-Aug-2017 A Approved Closed
Cluster 12, B2
Installation of Storm Drainage GRP pipes 400mm
089 KHEP-ME-089 Zone 1B, Line 16, Main Line 16 Zone 1B Division 33 2-Aug-2017 3-Aug-2017 11:00 AM 5-Aug-2017 A Approved Closed
Line: From MH-I53-L16~ MH-54-L15 (400mm)

Installation of Horizontal Pipe Sleeves for the Penetration of Water


090 KHEP-ME-090 Supply piping on Grade Beams Ground floor Cluster 3, A6 Zone 1A Division 22 2-Aug-2017 3-Aug-2017 10:00 AM 5-Aug-2017 A Approved Closed
Zone 1A, Cluster 3, A6

Inspection of Gravity Test for Sanitary Sewer uPVC Pipes 200mm -


Class 4
091 KHEP-ME-091 Line 2, Main Line: From MH-14-L01~ MH-13-L01 and Main Line: Line 2 NA Division 33 3-Aug-2017 5-Aug-2017 11:00 AM 6-Aug-2017 A Approved Closed
From MH-13-L01~ MH-12-L01 and Main Line: From MH-12-L01~
MH-11-L01
Installation of Sanitary sewer uPVC Pipes 200mm - Class 4
Zone 3B,
Line 23 & 24, Main Line: from MH-2-L23 - MH-1-L23 and Main
092 KHEP-ME-092
Line: from MH-1-L23 - MH-1a-L23 and Main Line: from MH-1a-L23 -
Line 23 & 24 Zone 3B Division 33 3-Aug-2017 5-Aug-2017 3:00 PM 6-Aug-2017 A Approved Closed
MH-17-L02 and Main Line: from MH-1-L24 - MH-1a-L24 and MH-1a-
L24 - MH-1-L23
Installation of Underground Drainage System (soil and Waste Line)
093 KHEP-ME-093 Below Ground Floor Structural slab Zone Cluster 69, B2 Zone 4B Division 22 6-Aug-2017 7-Aug-2017 9:45 AM 8-Aug-2017 E Rejected Closed
4B, Cluster 69, B2 -Left Villa
Installation of Underground Drainage System (soil and Waste Line)
093.1 KHEP-ME-093-01 Below Ground Floor Structural slab Zone Cluster 69, B2 Zone 4B Division 22 19-Aug-2017 20-Aug-2017 10:00 AM 23-Aug-2017 E Rejected Closed
4B, Cluster 69, B2 -Left Villa
Installation of Underground Drainage System (soil and Waste Line)
093.2 KHEP-ME-093-02 Below Ground Floor Structural slab Zone Cluster 69, B2 Zone 4B Division 22 27-Aug-2017 28-Aug-2017 10:30 AM 29-Aug-2017 E Rejected Closed
4B, Cluster 69, B2 -Left Villa
Installation of Underground Drainage System (soil and Waste Line)
Approved w/
093.3 KHEP-ME-093-03 Below Ground Floor Structural slab Zone Cluster 69, B2 Zone 4B Division 22 27-Sep-2017 28-Sep-2017 10:00 AM 27-Sep-2017 B comments
Closed
4B, Cluster 69, B2 -Left Villa
Installation of Vertical Pipe Sleeves for the Penetration of Drainage
and Water supply piping, Mechanical Openings at First Floor Division 22 &
094 KHEP-ME-094
Zone 1B,
Cluster 14 B2 Zone 1B
23
6-Aug-2017 7-Aug-2017 10:00 AM 8-Aug-2017 E Rejected Closed
Cluster 14, B2
Installation of Vertical Pipe Sleeves for the Penetration of Drainage
and Water supply piping, Mechanical Openings at First Floor Slab Division 22 &
094.1 KHEP-ME-094-01
Zone
Cluster 14 B2 Zone 1B
23
10-Aug-2017 12-Aug-2017 10:00 AM 12-Aug-2017 A Approved Closed
1B, Cluster 14, B2
Inspection of Gravity Test for Sanitary Sewer uPVC Pipes 200mm -
Class 4
Approved w/
095 KHEP-ME-095 Line 1, Main Line: From MH-11-L01~ MH-10-L01 and Main Line: Line 1 NA Division 33 6-Aug-2017 7-Aug-2017 11:00 AM 8-Aug-2017 B comments
Closed
From MH-10-L01~ MH-9-L01 and Main Line: From MH-9-L01~ MH-8-
L01
Installation of Horizontal Pipe Sleeves for the Penetration of
Drainage and Water supply piping, on Grade Beams Groud Floor
096 KHEP-ME-096 Cluster 7, B2 Zone 1B Division 22 8-Aug-2017 9-Aug-2017 10:00 AM 9-Aug-2017 E Rejected Closed
Zone 1B, Cluster 7, B2
Installation of Horizontal Pipe Sleeves for the Penetration of
Drainage and Water supply piping, on Grade Beams Groud Floor
096.1 KHEP-ME-096-01 Cluster 7, B2 Zone 1B Division 22 10-Aug-2017 12-Aug-2017 10:30 AM 12-Aug-2017 A Approved Closed
Zone 1B, Cluster 7, B2
Installation of Sanitary sewer uPVC Pipes 200mm - Class 4
Zone
3B, Line 26 & 25, Main Line: from MH-4-L26 - MH-3-L26 and Main
Approved w/
097 KHEP-ME-097 Line: from MH-3-L26 - MH-2-L26 and Main Line: from MH-2-L26 - Line 25,26 Zone 3B Division 33 8-Aug-2017 9-Aug-2017 3:00 PM 10-Aug-2017 B comments
Closed
MH-1-L26 and Main Line: from MH-1-L26 - MH-1a-L26 and MH-1a-
L26 - MH-15-L02 and Main Line: from MH-1-L25 - MH-1a-L25 and
MH-1a-L25 - MH-1-L26
Installation of Vertical Pipe Sleeves for the Penetration of Vent Pipes
at the Stair landing Area Between Ground and First Floor
098 KHEP-ME-098
Zone
Cluster 11 B2 Zone 1B Division 22 9-Aug-2017 10-Aug-2017 10:00 AM 10-Aug-2017 A Approved Closed
1B, Cluster 11, B2
Installation of Vertical Pipe Sleeves for the Penetration of Drainage
and Water supply piping, Mechanical Openings at First Floor Cluster 68, Division 22 &
099 KHEP-ME-099
Zone 4B, B2
Zone 4B
23
9-Aug-2017 10-Aug-2017 10:15 AM 10-Aug-2017 A Approved Closed
Cluster 68, B2
Installation of Gravity Test for Sanitary sewer uPVC Pipes 200mm -
Class 4
Line 23 & 24, Main Line: from MH-2-L23 - MH-1-L23 and
100 KHEP-ME-100
Main Line: from MH-1-L23 - MH-1a-L23 and Main Line: from MH-1a-
Line 23 & 24 NA Division 33 9-Aug-2017 10-Aug-2017 10:30 AM 10-Aug-2017 A Approved Closed
L23 - MH-17-L02 and Main Line: from MH-1-L24 - MH-1a-L24 and
MH-1a-L24 - MH-1-L23
Installation of Storm Drainage GRP pipes 500mm
Approved w/
101 KHEP-ME-101 Line 18, Main Line: From Line 18 NA Division 33 10-Aug-2017 12-Aug-2017 3:15 PM 12-Aug-2017 B comments
Closed
MH-61-L18~ MH-62-L18 (500mm)
Installation of Storm Drainage GRP pipes 800mm
102 KHEP-ME-102 Line 26, Main Line: From Line 26 NA Division 33 12-Aug-2017 13-Aug-2017 11:00 AM 14-Aug-2017 A Approved Closed
MH-125-L26~ MH-126-L26 (800mm)
Installation of Gravity Test for Sanitary sewer uPVC Pipes 200mm -
Class 4
Line 26, Main Line: from MH-4-L26 - MH-3-L26 and Main
103 KHEP-ME-103
Line: from MH-3-L26 - MH-2-L26 and Main Line: from MH-2-L26 -
Line 26 NA Division 33 12-Aug-2017 13-Aug-2017 10:30 AM 14-Aug-2017 A Approved Closed
MH-1-L26 and Main Line: from MH-1-L26 - MH-1a-L26 and MH-1a-
L26 - MH-15-L02
Installation of Gravity Test for Sanitary sewer uPVC Pipes 200mm -
Class 4 Approved w/
104 KHEP-ME-104
Line 25, Main Line: from MH-1-L25 - MH-1a-L25 and Main
Line 25 NA Division 33 13-Aug-2017 14-Aug-2017 10:30 AM 16-Aug-2017 B comments
Closed
Line: from MH-1a-L25 - MH-1-L26

Installation of Vertical Pipe Sleeves for the Penetration of Roof


Drains, Condensate Drains and Vent Pipes, Mechanical Openings on Division 22 &
105 KHEP-ME-105
the roof
Cluster 01 A6 Zone 1A
23
15-Aug-2017 16-Aug-2017 10:00 AM 16-Aug-2017 A Approved Closed
Zone 1A, Cluster 1, A6

Installation of Vertical Pipe Sleeves for the Penetration of Vent


Pipes at the Stair Landing Area between Ground and First Floor Cluster 10
106 KHEP-ME-106
B2
Zone 1B Division 22 15-Aug-2017 16-Aug-2017 10:30 AM 17-Aug-2017 E Rejected Closed
Zone 1B, Cluster 10, B2
Installation of Vertical Pipe Sleeves for the Penetration of Vent
Pipes at the Stair Landing Area between Ground and First Floor Cluster 10
106.1 KHEP-ME-106-01
B2
Zone 1B Division 22 19-Aug-2017 20-Aug-2017 10:00 AM 21-Aug-2017 A Approved Closed
Zone 1B, Cluster 10, B2
Installation of Underground Main Domestic Water Supply line (PPR
Pipes) Inside the Building Without Isolation valve Installed As
107 KHEP-ME-107
Highlighted Zone
Cluster 69, B2 Zone 4B Division 22 15-Aug-2017 16-Aug-2017 10:00 AM 17-Aug-2017 E Rejected Closed
4B, Cluster 69, B2
Installation of Underground Main Domestic Water Supply line (PPR
Pipes) Inside the Building Without Isolation valve Installed As
107.1 KHEP-ME-107-01
Highlighted Zone
Cluster 69, B2 Zone 4B Division 22 20-Aug-2017 21-Aug-2017 10:15 AM 23-Aug-2017 E Rejected Closed
4B, Cluster 69, B2 Left Villa
Installation of Main Domestic Water Supply line (PPR Pipes) Inside
the Building Without Isolation valve Installed As Highlighted Approved w/
107.2 KHEP-ME-107-02
Zone 4B, Cluster 69, B2
Cluster 69, B2 Zone 4B Division 22 28-Sep-2017 30-Sep-2017 10:00 AM 30-Sep-2017 B comments
Closed
Left Villa - GR

Installation of Sanitary sewer uPVC Pipes 200mm - Class 4 Zone


3B, Line 16 & 15, Main Line: from MH-4-L16 - MH-3-L16 and Main
108 KHEP-ME-108 Line: from MH-3-L16 - MH-3a-L16 and Main Line: from MH-3a-L16 - Line 16 & 15 Zone 3B Division 33 15-Aug-2017 16-Aug-2017 3:00 PM 17-Aug-2017 A Approved Closed
MH-2-L16 and Main Line: from MH-2-L16 - MH-1-L16 and MH-1-L16
- MH-16-L01 and Main Line: from MH-1-L15 - MH-2-L16

Installation of Vertical Pipe Sleeves for the Penetration of Drainage


and Water supply piping, Mechanical Openings at First Floor Division 22 &
109 KHEP-ME-109 Cluster 12 B2 Zone 1B
23
16-Aug-2017 17-Aug-2017 10:00 AM 19-Aug-2017 A Approved Closed
Zone 1B, Cluster 12, B2
Installation of Storm Drainage GRP pipes 800mm
Line 26, Main Line: From
110 KHEP-ME-110 MH-114-L27~ MH-115-L27 (800mm) and Main Line: From MH-115- Line 26 NA Division 33 17-Aug-2017 19-Aug-2017 3:00 PM 20-Aug-2017 A Approved Closed
L27~ MH-116-L27 (800mm) and Main Line: From MH-116-L27~ MH-
117-L27 (800mm)
Inspection of Gravity Test for Sanitary Sewer uPVC Pipes 200mm -
Class 4
Line 16, Main Line: From MH-4-L16~ MH-3-L16 and Main Line:
111 KHEP-ME-111
From MH-3-L16~ MH-3a-L16 and Main Line: From MH-3a-L16~ MH-
Line 16 NA Division 33 17-Aug-2017 19-Aug-2017 10:30 AM 20-Aug-2017 E Rejected Closed
2-L16 and Main Line: From MH-2-L16~ MH-1-L16 and MH-1-L16~
MH-16-L01
Inspection of Gravity Test for Sanitary Sewer uPVC Pipes 200mm -
Class 4
Line 16, Main Line: From MH-4-L16~ MH-3-L16 and Main Line: Approved w/
111.1 KHEP-ME-111-01
From MH-3-L16~ MH-3a-L16 and Main Line: From MH-3a-L16~ MH-
Line 16 NA Division 33 20-Aug-2017 21-Aug-2017 10:30 AM 22-Aug-2017 B comments
Closed
2-L16 and Main Line: From MH-2-L16~ MH-1-L16 and MH-1-L16~
MH-16-L01
Installation of Underground Drainage System (soil and Waste Line)
112 KHEP-ME-112 Below Ground Floor Structural slab Zone Cluster 69, B2 Zone 4B Division 22 19-Aug-2017 20-Aug-2017 10:15 AM 23-Aug-2017 E Rejected Closed
4B, Cluster 69, B2 -Right Villa
Installation of Underground Drainage System (soil and Waste Line)
112.1 KHEP-ME-112-01 Below Ground Floor Structural slab Zone Cluster 69, B2 Zone 4B Division 22 27-Aug-2017 28-Aug-2017 10:00 AM 29-Aug-2017 E Rejected Closed
4B, Cluster 69, B2 -Right Villa
Installation of Underground Drainage System (soil and Waste Line)
Approved w/
112.2 KHEP-ME-112-02 Below Ground Floor Structural slab Zone Cluster 69, B2 Zone 4B Division 22 27-Sep-2017 28-Sep-2017 10:30 AM 27-Sep-2017 B comments
Closed
4B, Cluster 69, B2 -Right Villa
Installation of Underground Main Domestic Water Supply Line (PPR
Pipes) Inside the Building Without Isolation Valve Installed As
113 KHEP-ME-113
Highlighted Zone
Cluster 69, B2 Zone 4B Division 22 19-Aug-2017 20-Aug-2017 10:45 AM 21-Aug-2017 E Rejected Closed
4B, Cluster 69, B2 -Right Villa
Inspection and Witnessing the Hydro static Pressure Testing of
Underground main domestic Water Supply Line (PPR Pipes) Installed
114 KHEP-ME-114 the Building Without Isolation Valve As Highlighted Cluster 69, B2 Zone 4B Division 22 19-Aug-2017 20-Aug-2017 11:00 AM 23-Aug-2017 E Rejected Closed
Zone 4B,
Cluster 69, B2
Installation of Storm Drainage GRP pipes 800mm
Line 26, Main Line: From
Approved w/
115 KHEP-ME-115 MH-117-L27~ MH-118-L27 (800mm) and Main Line: From MH-118- Line 26 NA Division 33 19-Aug-2017 20-Aug-2017 3:00 PM 21-Aug-2017 B comments
Closed
L27~ MH-119-L27 (800mm) and Main Line: From MH-119-L27~ MH-
120-L27 (800mm)
Installation of Vertical Pipe Sleeves for the Penetration of Drainage
and Water supply piping, Mechanical Openings at First Floor Division 22 &
116 KHEP-ME-116 Cluster 11 B2 Zone 1B
23
20-Aug-2017 21-Aug-2017 10:00 AM 21-Aug-2017 A Approved Closed
Zone 1B, Cluster 11, B2
Installation of Storm Drainage GRP pipes 400mm
Line 4 & 5, Main Line:
117 KHEP-ME-117 From MH-I10-L04~ MH-I12-L04 (400mm) and Main Line: From MH- Line 4 & 5 NA Division 33 20-Aug-2017 21-Aug-2017 3:00 PM 21-Aug-2017 A Approved Closed
I12-L04~ MH-I13-L04 (400mm) and Main Line: From MH-I11-L05~
MH-I12-L04 (400mm)
Installation of Horizontal Pipe Sleeves for the Penetration of Water
supply piping, on Grade Beams Ground Floor Cluster 81,
118 KHEP-ME-118
Zone 4A, A6
Zone 4A Division 22 21-Aug-2017 22-Aug-2017 10:00 AM 22-Aug-2017 A Approved Closed
Cluster 81, A6
Installation of Imbedded Domestic Hot and water Supply Pipes, Vent
Pipes, and Rainwater pipes on wall at First Floor (Besides Bedroom
119 KHEP-ME-119
2) Zone 4B,
Cluster 69, B2 Zone 4B, Division 22 22-Aug-2017 23-Aug-2017 10:00 AM 24-Aug-2017 E Rejected Closed
Cluster 69, B2

Installation of Embedded Domestic Hot and Cold water Supply Pipes,


Approved w/
119.1 KHEP-ME-119-01 on wall at First Floor (Besides Bedroom 2) Cluster 69, B2 Zone 1A Division 22 29-Oct-2017 30-Oct-2017 9:30 AM 1-Nov-2017 B comments
Closed
Zone 1A, Cluster 69, B2

Installation of Sanitary sewer uPVC Pipes 200mm - Class 4 Zone


3B, Line 14 & 13, Main Line: from MH-2-L14 - MH-1-L14 and Main
Approved w/
120 KHEP-ME-120 Line: from MH-1-L14 - MH-1a-L14 and Main Line: from MH-1a-L14 - Line 14 & 13 Zone 3B Division 33 22-Aug-2017 23-Aug-2017 3:00 PM 24-Aug-2017 B comments
Closed
MH-1-L13 and Main Line: from MH-2-L13 - MH-1-L13 and MH-1-L13
- MH-1a-L13 and Main Line: from MH-1a-L13 - MH-14-L01
Inspection of Gravity Test for Sanitary Sewer uPVC Pipes 200mm -
Approved w/
121 KHEP-ME-121 Class 4 Line 15 NA Division 33 22-Aug-2017 23-Aug-2017 10:30 AM 24-Aug-2017 B comments
Closed
Line 15, Main Line: From MH-1-L15~ MH-2-L16
Installation of Vertical Pipe Sleeves for the Penetration of Vent
Pipes at the Stair Landing Area Between Ground at First Floor
122 KHEP-ME-122 Cluster 17 B2 Zone 1B Division 22 23-Aug-2017 24-Aug-2017 10:00 AM 26-Aug-2017 A Approved Closed
Zone 1B, Cluster 17, B2
Installation of Horizontal Pipe Sleeves for the Penetration of Water
supply piping, on Grade Beams Ground Floor Cluster 66,
123 KHEP-ME-123
Zone 4A, A6
Zone 4A Division 22 24-Aug-2017 26-Aug-2017 10:00 AM 27-Aug-2017 A Approved Closed
Cluster 66, A6
Installation of Horizontal Pipe Sleeves for the Penetration of Water
supply piping, on Grade Beams Groud Floor
124 KHEP-ME-124
Zone 1A,
Cluster 4, A6 Zone 1A Division 22 24-Aug-2017 26-Aug-2017 10:30 AM 27-Aug-2017 A Approved Closed
Cluster 4, A6
Installation of Storm Drainage GRP pipes 400mm
Line 2, Main Line: From Approved w/
125 KHEP-ME-125
MH-I4-L02~ MH-I5-L02 (400mm) and Main Line: From MH-I5-L02~
Line 2 NA Division 33 24-Aug-2017 26-Aug-2017 3:00 PM 27-Aug-2017 B comments
Closed
MH-6-L01 (400mm)
Inspection of Gravity Test for Sanitary Sewer uPVC Pipes 200mm -
Class 4
Zone 3B, Line 14 & 13, Main Line: From MH-2-L14~ MH-1-L14 and
126 KHEP-ME-126
Main Line: From MH-1-L14~ MH-1a-L14 and Main Line: From MH-1a-
Line 14 & 13 Zone 3B Division 33 24-Aug-2017 26-Aug-2017 10:30 AM 27-Aug-2017 A Approved Closed
L14~ MH-1-L13 and Main Line: From MH-2-L13~ MH-1-L13 and
MH-1-L13~ MH-1a-L13

Inspection of Gravity Test for Sanitary Sewer uPVC Pipes 200mm -


Approved w/
127 KHEP-ME-127 Class 4 Line 13 Zone 3B Division 33 27-Aug-2017 28-Aug-2017 10:30 AM 29-Aug-2017 B comments
Closed
Zone 3B, Line 13, Main Line: From MH-1a-L13~ MH-14-L13

Installation of Vertical Pipe Sleeves for the Penetration of Drainage


and Water supply piping, Mechanical Openings at First Floor Division 22 &
128 KHEP-ME-128 Cluster 10 B2 Zone 1B
23
28-Aug-2017 29-Aug-2017 10:00 AM 29-Aug-2017 A Approved Closed
Zone 1B, Cluster 10, B2
Installation of Storm Drainage GRP pipes 400 & 500mm
Line 3 & 1, Main Approved w/
129 KHEP-ME-129
Line: From MH-I7-L03~ MH-I8-L01 (400mm) and Main Line: From
Line 3 & 1 NA Division 33 29-Aug-2017 30-Aug-2017 10:00 AM 30-Aug-2017 B comments
Closed
MH-I8-L01~ MH-9-L01 (500mm)
Installation of Storm Drainage GRP pipes 400mm
Approved w/
130 KHEP-ME-130 Line 36, Main Line: From Line 36 NA Division 33 29-Aug-2017 30-Aug-2017 11:00 AM 30-Aug-2017 B comments
Closed
MH-133-L36~ MH-126-L26 (400mm)
Installation of Storm Drainage GRP pipes 400 & 500mm
Line 22, Main
Approved w/
131 KHEP-ME-131 Line: From MH-83-L22~ MH-84-L22 (400mm) and Main Line: From Line 22 NA Division 33 6-Sep-2017 7-Sep-2017 3:00 PM 9-Sep-2017 B comments
Closed
MH-84-L22~ MH-87-L22 (400mm) and Main Line: From MH-87-L22~
MH-88-L22 (500mm)
Installation of Storm Drainage GRP pipes 400mm
Line 21, Main Line: From Approved w/
132 KHEP-ME-132
MH-77-L21~ MH-78-L21 (400mm) and Main Line: From MH-78-L21~
Line 21 NA Division 33 6-Sep-2017 7-Sep-2017 11:00 AM 9-Sep-2017 B comments
Closed
MH-79-L21 (400mm)
Installation of Horizontal Pipe Sleeves for the Penetration of
Drainage piping at Groud Floor Grade Beams Cluster 16
133 KHEP-ME-133
Zone 1B, BC4
Zone 1B Division 22 7-Sep-2017 9-Sep-2017 10:00 AM 10-Sep-2017 A Approved Closed
Cluster 16, BC4
Installation of Sanitary sewer uPVC Pipes 200mm - Class 4 Zone
4B, Line 18 & 19, Main Line: from MH-3-L19 - MH-2-L19 and Main
Approved w/
134 KHEP-ME-134 Line: from MH-2-L19 - MH-1-L19 and Main Line: from MH-1-L19 - Line 18 & 19 Zone 4B Division 33 7-Sep-2017 9-Sep-2017 3:00 PM 9-Sep-2017 B comments
Closed
MH-21-L01 and Main Line: from MH-1-L18 - MH-1a-L18 and MH-1a-
L18 - MH-2-L19
Inspection of Gravity Test for Sanitary Sewer uPVC Pipes 200mm -
Class 4
Zone 4B, Line 19 & 18,
Approved w/
135 KHEP-ME-135 Main Line: From MH-3-L19 ~ MH-2-L19 & Main Line: from MH-2-L19 Line 19 & 18 Zone 4B Division 33 10-Sep-2017 11-Sep-2017 3:00 PM 12-Sep-2017 B comments
Closed
~ MH-1-L19 & Main Line: from MH-1-L19 - MH-1-L19
Main Line: from MH-1-L19 - MH-21-L01 and MH-1-L18 ~
MH-2-L19
Installation of Horizontal Pipe Sleeves for the Penetration of Drainage
136 KHEP-ME-136 piping on grade beams Ground floor Zone 1B, Cluster Cluster 19 B2 Zone 1B Division 22 11-Sep-2017 12-Sep-2017 10:00 AM 13-Sep-2017 A Approved Closed
19, B2
Installation of Horizontal Pipe Sleeves for the Penetration of Drainage
137 KHEP-ME-137 piping on grade beams Ground floor Zone 1B, Cluster 8, Cluster 8, B2 Zone 1B Division 22 11-Sep-2017 12-Sep-2017 10:30 AM 13-Sep-2017 A Approved Closed
B2
Installation of Vertical Pipe Sleeves for the Penetration of vent pipes
138 KHEP-ME-138 at the stair landing area between ground and first floor Zone 1B, Cluster 5, B2 Zone 1B Division 22 11-Sep-2017 12-Sep-2017 11:00 AM 13-Sep-2017 A Approved Closed
Cluster 5, B2
Installation of Sanitary sewer uPVC Pipes 200mm - Class 4 Zone
Approved w/
139 KHEP-ME-139 4B, Line 17, Main line : from MH-2-L17 ~ MH-2-A-L17, Main line : Line 17 Zone 4B Division 33 12-Sep-2017 13-Sep-2017 3:30 PM 14-Sep-2017 B comments
Closed
from MH-2-A-L17 ~ MH-1-L17
Inspection for Gravity test for sanitary sewer uPVC pipes 200mm,
Class 4 Zone
140 KHEP-ME-140
4B, Line 17, Main Line : from MH-2-L17 ~ MH-2-A-L17, Main Line :
Line 17 Zone 4B Division 33 13-Sep-2017 14-Sep-2017 10:30 AM 16-Sep-2017 A Approved Closed
from MH-2A-L17 ~ MH-1-L17
Installation of storm drainage GRP pipes 400mm Line
Approved w/
141 KHEP-ME-141 33, Main line: From MH-I121-L33 ~ MH-I122-L33, Main line: From Line 33 NA Division 33 16-Sep-2017 17-Sep-2017 11:30 AM 17-Sep-2017 B comments
Closed
MH-I121-L33 ~ MH-I123-L33
Installation of storm drainage GRP pipes 500mm Line Approved w/
142 KHEP-ME-142
20, Main line: From MH-67-L20 ~ MH-68-L20
Line 20 NA Division 33 16-Sep-2017 17-Sep-2017 11:30 AM 17-Sep-2017 B comments
Closed

Installation of Horizontal Pipe Sleeves for the Penetration of Drainage


143 KHEP-ME-143 Pipeing on Greade beams ground floor Cluster 75, B2 Zone 4B Division 22 17-Sep-2017 18-Sep-2017 10:00 AM 19-Sep-2017 A Approved Closed
Zone 4B, Cluster 75, B2
Installation of Vertical Pipe Sleeves for the Penetration of vent pipes
Division 22 &
144 KHEP-ME-144 at the stair landing area between ground and first floor Zone 1B, Cluster 5, B2 Zone 1B
23
17-Sep-2017 18-Sep-2017 10:30 AM 19-Sep-2017 A Approved Closed
Cluster 5, B2
Installation of Vertical Pipe Sleeves for the Penetration of roof drain,
Condensate Drain, Vent pipes and Mechanical Openings on the roof Division 22 &
145 KHEP-ME-145
slab Zone 1A, Cluster
Cluster 02 A6 Zone 1A
23
18-Sep-2017 19-Sep-2017 10:00 AM 20-Sep-2017 A Approved Closed
2, A6
Installation of Vertical Pipe Sleeves for the Penetration of Drainage
and water supply piping, air vent and mechanical openings first floor Division 22 &
146 KHEP-ME-146
slab Zone 1B, Cluster 17,
Cluster 17 B2 Zone 1B
23
19-Sep-2017 20-Sep-2017 10:00 AM 21-Sep-2017 A Approved Closed
B2
Installation of storm drainage GRP pipes 500mm Line
21, Zone 3B, Main line: From MH-79-L21 ~ MH-I80-L21, Main line: Approved w/
147 KHEP-ME-147
From MH-I80-L21 ~ MH-I81-L21, Main line: From MH-I81-L21 ~ MH-
Line 21 Zone 3B Division 33 19-Sep-2017 20-Sep-2017 11:30 AM 21-Sep-2017 B comments
Closed
I82-L21
Installation of storm drainage GRP pipes 400mm Line Approved w/
148 KHEP-ME-148
37, Zone 3B, Main line: From MH-134-L37 ~ MH-75-L18
Line 37 Zone 3B Division 33 19-Sep-2017 20-Sep-2017 11:30 AM 21-Sep-2017 B comments
Closed

Installation of Storm Drainage GRP pipes 500 & 600mm


Line 27, Main
Approved w/
149 KHEP-ME-149 Line: From MH-100-L27~ MH-101-L27 (500mm) and Main Line: Line 27 NA Division 33 20-Sep-2017 21-Sep-2017 11:30 AM 24-Sep-2017 B comments
Closed
From MH-101-L27~ MH-105-L27 (600mm) and Main Line: From MH-
105-L27~ MH-108-L27 (600mm)
Installation of Horizontal Pipe Sleeves for the Penetration of Drainage
150 KHEP-ME-150 Pipeing on Grade beams ground floor Cluster 20 B2 Zone 1B Division 22 20-Sep-2017 21-Sep-2017 10:00 AM 24-Sep-2017 A Approved Closed
Zone 1B, Cluster 20, B2
Installation of Horizontal Pipe Sleeves for the Penetration of Drainage
151 KHEP-ME-151 Pipeing on Grade beams ground floor Cluster 61, B2 Zone 3B Division 22 20-Sep-2017 21-Sep-2017 10:30 AM 24-Sep-2017 A Approved Closed
Zone 3B, Cluster 61, B2
Installation of Horizontal Pipe Sleeves for the Penetration of Drainage
Cluster 6,
152 KHEP-ME-152 Pipeing on Grade beams ground floor
BC4
Zone 1B Division 23 21-Sep-2017 23-Sep-2017 10:00 AM 25-Sep-2017 A Approved Closed
Zone 1B, Cluster 6, BC4
Installation of storm drainage GRP pipes 800mm Zone
153 KHEP-ME-153
4B, Line 26, Main line: From MH-120-L26 ~ MH-125-L26
Line 26 Zone 4B Division 23 21-Sep-2017 23-Sep-2017 11:30 AM 25-Sep-2017 A Approved Closed

Installation of storm drainage GRP pipes 400mm Zone


3B, Line 28 & 29, Main line: From MH-I103-L29 ~ MH-I104-L28,
154 KHEP-ME-154
Main line: From MH-I104-L28 ~ MH-I105-L27, Main line: From MH-
Line 28 & 29 Zone 3B Division 33 23-Sep-2017 24-Sep-2017 11:30 AM 25-Sep-2017 A Approved Closed
I102-L28 ~ MH-I104-L28
Installation of storm drainage GRP pipes from main line to Manhole
155 KHEP-ME-155 (Short piece) 400mm Zone 1B, Line Line 10 & 13 Zone 1B Division 33 23-Sep-2017 24-Sep-2017 11:30 AM 25-Sep-2017 A Approved Closed
10 & 13, MH-I31-L10 ~ MH-I41-L13
Installation of Vertical Pipe Sleeves for the Penetration of Drainage
and water supply piping, air vent and mechanical openings at stair Division 22 &
156 KHEP-ME-156
Landing and first floor slab
Cluster 7, B2 Zone 1B
23
25-Sep-2017 26-Sep-2017 10:00 AM 28-Sep-2017 A Approved Closed
Zone 1B, Cluster 7, B2
Installation of storm drainage GRP pipes from main line to Manhole
Approved w/
157 KHEP-ME-157 (Short piece) 400mm Zone 1B, Line Line 11 Zone 1B Division 33 25-Sep-2017 26-Sep-2017 11:30 AM 28-Sep-2017 B comments
Closed
11, MH-I33-L11 ~ MH-I34-L11
Installation of storm drainage GRP pipes 400mm Zone
3B, Line 9, Main line: From MH-I122-L09 ~ MH-I123-L09, Main line:
158 KHEP-ME-158
From MH-I123-L09 ~ MH-I124-L09, Main line: From MH-I124-L09 ~
Line 9 Zone 3B Division 33 25-Sep-2017 26-Sep-2017 11:30 AM 28-Sep-2017 A Approved Closed
MH-I125-L09
Inspection and Witnessing the Gravity Testing of Underground
Drainage System (UPVC) Installed Inside the Building As Highlighted
159 KHEP-ME-159
Zone 4B, Cluster
Cluster 69 Zone 4B Division 22 27-Sep-2017 28-Sep-2017 10:00 AM 27-Sep-2017 A Approved Closed
69, B2 (Left Villa)
Inspection and Witnessing the Gravity Testing of Underground
Drainage System (UPVC) Installed Inside the Building As Highlighted
160 KHEP-ME-160 Zone 4B, Cluster Cluster 69 Zone 4B Division 22 27-Sep-2017 28-Sep-2017 10:30 AM 27-Sep-2017 E Rejected Closed
69, B2 (Right Villa)
Inspection and Witnessing the Gravity Testing of Underground
Drainage System (UPVC) Installed Inside the Building As Highlighted
160.1 KHEP-ME-160-01 Zone 4B, Cluster Cluster 69 Zone 4B Division 22 8-Oct-2017 9-Oct-2017 10:00 AM 9-Oct-2017 A Approved Closed
69, B2 (Right Villa)

Installation of Sanitary sewer uPVC Pipes 200mm - Class 4 Zone


161 KHEP-ME-161
3B, Line 1, Main line : from MH-15-L01 ~ MH-14-L01
Line 1 Zone 3B Division 33 27-Sep-2017 28-Sep-2017 10:30 AM 30-Sep-2017 A Approved Closed

Installation of Vertical Pipe Sleeves for the Penetration of Drainage


and water supply piping, air vent and mechanical openings at stair Division 22 &
162 KHEP-ME-162
Landing and first floor slab
Cluster 5, B2 Zone 1B
23
27-Sep-2017 28-Sep-2017 10:00 AM 30-Sep-2017 A Approved Closed
Zone 1B, Cluster 5, B2
Installation of storm drainage GRP pipes 500mm Zone
3B, Line 27, Main line: From MH-I97-L27 ~ MH-I98-L27, Main line: Approved w/
163 KHEP-ME-163
From MH-I98-L27 ~ MH-I99-L27, Main line: From MH-I99-L27 ~ MH-
Line 27 Zone 3B Division 33 28-Sep-2017 30-Sep-2017 11:30 AM 30-Sep-2017 B comments
Closed
I100-L27
Installation of storm drainage GRP pipes 400mm Zone Approved w/
164 KHEP-ME-164
2B, Line 1, Main line: From MH-6-L01 ~ MH-I8-L01
Line 1 Zone 2B Division 33 30-Sep-2017 1-Oct-2017 11:30 AM 1-Oct-2017 B comments
Closed

Installation of Horizontal Pipe Sleeves for the Penetration of Drainage


165 KHEP-ME-165 piping on Grade Beams Ground Floor Cluster 48, B2 Zone 3B Division 33 30-Sep-2017 1-Oct-2017 10:00 AM 1-Oct-2017 A Approved Closed
Zone 3B, Cluster 48, B2
Installation of Horizontal Pipe Sleeves for the Penetration of Drainage
166 KHEP-ME-166 piping on Grade Beams Ground Floor Cluster 58, B2 Zone 3B Division 33 30-Sep-2017 1-Oct-2017 10:30 AM 1-Oct-2017 A Approved Closed
Zone 3B, Cluster 58, B2
Installation of storm drainage GRP pipes 400mm Zone
167 KHEP-ME-167 4B, Line 23 & 31, Main line: From MH-I109-L31 ~ MH-110A-L27, Line 23 & 31 Zone 4B Division 33 1-Oct-2017 2-Oct-2017 11:30 AM 2-Oct-2017 A Approved Closed
Main line: From MH-I85-L23 ~ MH-87-L22
Installation of Horizontal Pipe Sleeves for the Penetration of Drainage
168 KHEP-ME-168 piping on Grade Beams Ground Floor Cluster 71, B2 Zone 4B Division 22 1-Oct-2017 2-Oct-2017 10:00 AM 2-Oct-2017 A Approved Closed
Zone 4B, Cluster 71, B2

Installation of Overhead (Above Ceiling) Domestic Water line From


main Line to Branches, To Garage Hoss Bibb, Balcony First Floor,
Hose Bibb Front side, and Kitchen Water Supply (DHW & DCW), PPR Approved w/
169 KHEP-ME-169
Pipes only Without any Piping Accessories Inside the Building Ground
Cluster 69, B2 Zone 4B Division 22 2-Oct-2017 3-Oct-2017 10:00 AM 4-Oct-2017 B comments
Closed
Floor As Highlighted Zone
4B, Cluster 69, B2 Left Villa

Installation of Vertical Pipe Sleeves for the Penetration of Roof


Drain,Condensate Drain, Vent Pipes, and Block-Outs for Mechanical
170 KHEP-ME-170
Opening on the Roof Floor slab
Cluster 14 B2 Zone 1B Division 22 2-Oct-2017 3-Oct-2017 10:30 AM 5-Oct-2017 A Approved Closed
Zone 1B, Cluster 14, B2
Inspection for Gravity test for sanitary sewer uPVC pipes 200mm,
Approved w/
171 KHEP-ME-171 Class 4 Zone Line 1 Zone 3B Division 33 2-Oct-2017 3-Oct-2017 11:30 AM 4-Oct-2017 B comments
Closed
3B, Line 1, Main Line : from MH-15-L01 ~ MH-14-L01

Installation of Riser Pipes for Domestic Cold Hot Water Supply Line
for Kitchen sink embedded on Wall (without any piping accessories)
172 KHEP-ME-172
Located at Ground floor As Highlighted
Cluster 69, B2 Zone 4B Division 22 2-Oct-2017 3-Oct-2017 2:00 PM 3-Oct-2017 A Approved Closed
Zone 4B, Cluster 69, B2 Left Villa
Installation of FCU Condensate Drain Riser pipe embedded on wall
173 KHEP-ME-173 Located at Kitchen Ground floor As Highlighted Cluster 69, B2 Zone 4B Division 23 3-Oct-2017 4-Oct-2017 10:30 AM 5-Oct-2017 A Approved Closed
Zone 4B, Cluster 69, B2 Left Villa
Installation of Vertical Pipe Sleeves for the Penetration of Roof
Drain,Condensate Drain, Vent Pipes, and Block-Outs for Mechanical Division 22 &
174 KHEP-ME-174
Opening on the Roof Floor slab
Cluster 12 B2 Zone 1B
23
3-Oct-2017 4-Oct-2017 10:00 AM 5-Oct-2017 A Approved Closed
Zone 1B, Cluster 12, B2
Installation of storm drainage GRP pipes from main line to Manhole
175 KHEP-ME-175 (Short piece) 400mm Zone 1B, Line Line 13 Zone 1B Division 33 3-Oct-2017 4-Oct-2017 11:30 AM 5-Oct-2017 A Approved Closed
13, MH-I42-L13
Installation of Vertical Pipe Sleeves for the Penetration of Roof
Drain,Condensate Drain, Vent Pipes, and Block-Outs for Mechanical Division 22 &
176 KHEP-ME-176
Opening on the Roof Floor slab
Cluster 13 B2 Zone 1B
23
4-Oct-2017 5-Oct-2017 10:00 AM 5-Oct-2017 A Approved Closed
Zone 1B, Cluster 13, B2
Installation of storm drainage GRP pipes From main line to manhole
177 KHEP-ME-177 (short piece) 400mm Zone1B, Line Line 16 Zone1B Division 33 5-Oct-2017 7-Oct-2017 11:30 AM 7-Oct-2017 A Approved Closed
16, Main line: From MH-I53-L16
Installation of Vertical Pipe Sleeves for the Penetration of Roof
Drain,Condensate Drain, Vent Pipes, and Block-Outs for Mechanical Division 22 &
178 KHEP-ME-178
Opening on the Roof Floor slab
Cluster 10 B2 Zone 1B,
23
8-Oct-2017 9-Oct-2017 10:00 AM 9-Oct-2017 A Approved Closed
Zone 1B, Cluster 10, B2
Installation of Vertical Pipe Sleeves for the Penetration of Roof
Drain,Condensate Drain, Vent Pipes, and Block-Outs for Mechanical Division 22 &
179 KHEP-ME-179
Opening on the Roof Floor slab
Cluster 11 B2 Zone 1B,
23
8-Oct-2017 9-Oct-2017 10:30 AM 9-Oct-2017 A Approved Closed
Zone 1B, Cluster 11, B2
Installation of Horizontal Pipe Sleeves for the Penetration of Water
Cluster 44,
180 KHEP-ME-180 Supply piping on Grade Beams Ground Floor
A6
Zone 4A Division 22 8-Oct-2017 9-Oct-2017 11:00 AM 10-Oct-2017 E Rejected Closed
Zone 4A, Cluster 44, A6
Installation of Horizontal Pipe Sleeves for the Penetration of Water
Cluster 44,
180.1 KHEP-ME-180-01 Supply piping on Grade Beams Ground Floor
A7
Zone 4A Division 23 15-Oct-2017 16-Oct-2017 10:00 AM 17-Oct-2017 A Approved Closed
Zone 4A, Cluster 44, A6
Installation of underground drainage system (soil and waste line)
181 KHEP-ME-181 below ground floor stuctural Slab Zone 1A, Cluster 01 A6 Zone 1A Division 33 9-Oct-2017 10-Oct-2017 10:00 AM 11-Oct-2017 A Approved Closed
Cluster 1, A6
Installation of underground drainage system (soil and waste line)
182 KHEP-ME-182 below ground floor stuctural Slab Zone 1A, Cluster 01 A6 Zone 1A Division 22 10-Oct-2017 11-Oct-2017 10:00 AM 12-Oct-2017 A Approved Closed
Cluster 1, A6 Villa 4
Installation of storm drainage GRP Pipes 600mm Zone
3B, Main
183 KHEP-ME-183
Line: MH-71-L20 to MH-I72-L20 600mm Main
N/A Zone 3B Division 33 10-Oct-2017 11-Oct-2017 11:30 AM 12-Oct-2017 A Approved Closed
Line: MH-72-L20 to MH-I73-L19 600mm
Installation of Vertical Pipe Sleeves for the Penetration of Vent
Pipesat the Stair Landing Area between Ground and First Floor
184 KHEP-ME-184
Zone 1B,
Cluster 8, B2 Zone 1B Division 22 11-Oct-2017 12-Oct-2017 10:00 AM 14-Oct-2017 A Approved Closed
Cluster 8, B2
Installation of Vertical Pipe Sleeves for the Penetration of Vent
Pipesat the Stair Landing Area between Ground and First Floor
185 KHEP-ME-185
Zone 3B,
Cluster 61, B2 Zone 3B Division 22 12-Oct-2017 14-Oct-2017 10:00 AM 14-Oct-2017 A Approved Closed
Cluster 61, B2
Installation of Vertical Pipe Sleeves for the Penetration of Vent
Pipesat the Stair Landing Area between Ground and First Floor Cluster 16
186 KHEP-ME-186
Zone 1B, BC4
Zone 1B Division 22 12-Oct-2017 14-Oct-2017 10:30 AM 14-Oct-2017 A Approved Closed
Cluster 16, BC4
Installation of storm drainage GRP pipes 400mm Zone
5C, Line 34, Main line: From MH-128-L34 ~ MH-129-L34 and Main
187 KHEP-ME-187
line: From MH-129-L34 ~ MH-130-L34 and Main line: From MH-130-
Line 34 Zone 5C Division 33 12-Oct-2017 14-Oct-2017 11:30 AM 14-Oct-2017 A Approved Closed
L34 ~ MH-131-L34
Inspection and Witnessing the Gravity Testing of Underground
Dranage System (UPVC) Installed Inside the Building As Highlighted
188 KHEP-ME-188
Zone 1A, Cluster
Cluster 01 A6 Zone 1A Division 22 12-Oct-2017 14-Oct-2017 10:00 AM 14-Oct-2017 A Approved Closed
1, A6, Villa 3
Inspection and Witnessing the Gravity Testing of Underground
Dranage System (UPVC) Installed Inside the Building As Highlighted
189 KHEP-ME-189
Zone 1A, Cluster
Cluster 01 A6 Zone 1A Division 22 12-Oct-2017 14-Oct-2017 10:30 AM 14-Oct-2017 A Approved Closed
1, A6, Villa 4
Installation of Underground Drainage System (Soil and Waste pipe
Approved w/
190 KHEP-ME-190 Line) Below Ground Floor Structural Slab Cluster 01 A6 Zone 1A Division 22 15-Oct-2017 16-Oct-2017 10:30 AM 16-Oct-2017 B comments
Closed
Zone 1A, Cluster 1, A6, Villa 5
Installation of Underground Drainage System (Soil and Waste uPVC
Approved w/
191 KHEP-ME-191 pipe Line) Below Ground Floor Structural Slab Cluster 15 B2 Zone 1B Division 22 16-Oct-2017 17-Oct-2017 10:30 AM 19-Oct-2017 B comments
Closed
Zone 1B, Cluster 15, B2, Right Villa
Inspection and Witnessing the Gravity Testing of Underground
Drainage System (UPVC) Installed Inside the Building As Highlighted Approved w/
192 KHEP-ME-192
Zone 1A,
Cluster 01 A6 Zone 1A Division 22 16-Oct-2017 17-Oct-2017 10:00 AM 19-Oct-2017 B comments
Closed
Cluster 1, A6, Villa 5
Inspection and Witnessing the Gravity Lake Test of Underground
Drainage System (UPVC) Installed Inside the Building As Highlighted
193 KHEP-ME-193
Zone 1B, Cluster 15, B2,
Cluster 15 B2 Zone 1B Division 22 18-Oct-2017 19-Oct-2017 10:00 AM 19-Oct-2017 A Approved Closed
Right Villa
Installation of Horizontal Pipe Sleeves for the Penetration of Water
Cluster 43,
194 KHEP-ME-194 Supply piping on Grade Beams Ground Floor
A6
Zone 2A Division 22 19-Oct-2017 21-Oct-2017 10:00 AM 21-Oct-2017 A Approved Closed
Zone 2A, Cluster 43, A6
Installation of Vertical Pipe Sleeves for the Penetration of Roof
Drain,Condensate Drain, Vent Pipes, and Block-Outs for Mechanical Division 22 &
195 KHEP-ME-195
Opening on the Roof Floor slab
Cluster 68, B2 Zone 4B
23
19-Oct-2017 21-Oct-2017 10:30 AM 22-Oct-2017 A Approved Closed
Zone 4B, Cluster 68, B2
Installation of Vertical Pipe Sleeves for the Penetration of Vent Pipes
at the Stair Landing Area between Ground and First Floor Cluster 6,
196 KHEP-ME-196
Zone 1B, Cluster 6, BC4
Zone 1B Division 22 21-Oct-2017 22-Oct-2017 10:00 AM 23-Oct-2017 A Approved Closed
BC4
Installation of Vertical Pipe Sleeves for the Penetration of Vent Pipes
at the Stair Landing Area between Ground and First Floor
197 KHEP-ME-197
Zone 3B, Cluster 48,
Cluster 48, B2 Zone 3B Division 22 21-Oct-2017 22-Oct-2017 10:30 AM 23-Oct-2017 A Approved Closed
B2
Installation of Vertical Pipe Sleeves for the Penetration of Roof
Drain,Condensate Drain, Vent Pipes, and Block-Outs for Mechanical Division 22 &
198 KHEP-ME-198
Opening on the Roof Floor slab
Cluster 17 B2 Zone 1B
23
21-Oct-2017 22-Oct-2017 11:00 AM 24-Oct-2017 A Approved Closed
Zone 1B, Cluster 17, B2

Installation of storm drainage GRP pipes From main line to manhole


199 KHEP-ME-199 (short piece) 400mm Zone1B, Line Line 33 Zone1B Division 33 22-Oct-2017 23-Oct-2017 11:30 AM 24-Oct-2017 A Approved Closed
33, Main line: From MH-I39-L13 and Main line: From MH-I40-L13

Installation of Underground Drainage System (Soil and Waste uPVC


200 KHEP-ME-200 pipe Line) Below Ground Floor Structural Slab Cluster 01 A6 Zone 1A Division 22 22-Oct-2017 23-Oct-2017 10:00 AM 25-Oct-2017 E Rejected Closed
Zone 1A, Cluster 1, A6, Villa 5
Installation of Underground Drainage System (Soil and Waste uPVC
Approved w/
200.1 KHEP-ME-200-01 pipe Line) Below Ground Floor Structural Slab Cluster 01 A6 Zone 1A Division 22 25-Oct-2017 27-Oct-2017 10:00 AM 28-Oct-2017 B comments
Closed
Zone 1A, Cluster 1, A6, Villa 6
Installation of Vertical Pipe Sleeves for the Penetration of Drainage
and water supply piping, air vent and mechanical openings at first Division 22 &
201 KHEP-ME-201
floor slab Zone 1B, Cluster
Cluster 8, B2 Zone 1B
23
24-Oct-2017 25-Oct-2017 10:00 AM 26-Oct-2017 A Approved Closed
8, B2
Installation of Vertical Pipe Sleeves for the Penetration of Vent Pipes
at the Stair Landing Area between Ground and First Floor
202 KHEP-ME-202
Zone 3B, Cluster 58,
Cluster 58, B2 Zone 3B Division 22 24-Oct-2017 25-Oct-2017 10:30 AM 26-Oct-2017 A Approved Closed
B2
Inspection of Gravity Lake Test of Underground Drainage System
203 KHEP-ME-203 (UPVC) Installed Inside the Building As Highlighted Zone 1A, Cluster 01 A6 Zone 1A Division 22 28-Oct-2017 29-Oct-2017 8:00 AM 30-Oct-2017 E Rejected Closed
Cluster 1, A6, Villa 6
Inspection of Gravity Lake Test of Underground Drainage System
203.1 KHEP-ME-203-01 (UPVC) Installed Inside the Building As Highlighted Zone 1A, Cluster 01 A6 Zone 1A Division 22 30-Oct-2017 31-Oct-2017 8:30 AM 1-Nov-2017 A Approved Closed
Cluster 1, A6, Villa 6
Installation of Underground Drainage System (Soil and Waste uPVC
Approved w/
204 KHEP-ME-204 pipe Line) Below Ground Floor Structural Slab Cluster 01 A6 Zone 1A Division 22 28-Oct-2017 29-Oct-2017 9:00 AM 30-Oct-2017 B comments
Closed
Zone 1A, Cluster 1, A6, Villa 1
Installation of Underground Drainage System (Soil and Waste uPVC
Approved w/
205 KHEP-ME-205 pipe Line) Below Ground Floor Structural Slab Cluster 01 A6 Zone 1A Division 22 28-Oct-2017 29-Oct-2017 9:30 AM 30-Oct-2017 B comments
Closed
Zone 1A, Cluster 1, A6, Villa 2
Installation of Underground Drainage System (Soil and Waste uPVC
Approved w/
206 KHEP-ME-206 pipe Line) Below Ground Floor Structural Slab Cluster 02 A6 Zone 1A Division 22 28-Oct-2017 29-Oct-2017 10:00 AM 30-Oct-2017 B comments
Closed
Zone 1A, Cluster 2, A6, Villa 2
Installation of Underground Drainage System (Soil and Waste uPVC
Approved w/
207 KHEP-ME-207 pipe Line) Below Ground Floor Structural Slab Cluster 02 A6 Zone 1A Division 22 28-Oct-2017 29-Oct-2017 10:30 AM 30-Oct-2017 B comments
Closed
Zone 1A, Cluster 2, A6, Villa 3
Installation of Underground Drainage System (Soil and Waste uPVC
Approved w/
208 KHEP-ME-208 pipe Line) Below Ground Floor Structural Slab Cluster 02 A6 Zone 1A Division 22 28-Oct-2017 29-Oct-2017 11:00 AM 30-Oct-2017 B comments
Closed
Zone 1A, Cluster 2, A6, Villa 4
Installation of Underground Drainage System (Soil and Waste uPVC
Approved w/
209 KHEP-ME-209 pipe Line) Below Ground Floor Structural Slab Cluster 02 A6 Zone 1A Division 22 28-Oct-2017 29-Oct-2017 11:30 AM 30-Oct-2017 B comments
Closed
Zone 1A, Cluster 2, A6, Villa 5
Installation of Underground Drainage System (Soil and Waste uPVC
Approved w/
210 KHEP-ME-210 pipe Line) Below Ground Floor Structural Slab Cluster 02 A6 Zone 1A Division 22 28-Oct-2017 29-Oct-2017 12:00 PM 30-Oct-2017 B comments
Closed
Zone 1A, Cluster 2, A6, Villa 6
Installation of Underground Drainage System (Soil and Waste uPVC
Approved w/
211 KHEP-ME-211 pipe Line) Below Ground Floor Structural Slab Cluster 15 B2 Zone 1A Division 22 28-Oct-2017 29-Oct-2017 1:30 PM 30-Oct-2017 B comments
Closed
Zone 1A, Cluster 15, B2, Left Villa
Installation of storm drainage GRP pipes From main Line to manhloes
(short piece) 400mm Zone 2B, Line 8,
212 KHEP-ME-212
MH-21-L08, 400mm and MH-26-L08 400,500mm and MH-26A-L08,
Line 8 Zone 2B Division 33 28-Oct-2017 29-Oct-2017 2:30 PM 30-Oct-2017 A Approved Closed
500mm
Installation of Embedded Domestic Hot and Cold water Supply Pipes,
213 KHEP-ME-213 on wall at Ground Floor (Kitchen area) Zone 1A, Cluster Zone 1A Cluster 69, B2 Division 22 29-Oct-2017 30-Oct-2017 10:00 AM 31-Oct-2017 A Approved Closed
69, B2, Right Villa
Installation of Embedded Condensate pipe and drainage pipe on wall
214 KHEP-ME-214 at Ground Floor (Kitchen area) Zone 1A, Zone 1A Cluster 69, B2 Division 22 29-Oct-2017 30-Oct-2017 10:30 AM 31-Oct-2017 A Approved Closed
Cluster 69, B2, Right Villa
Installation of Vertical Pipe Sleeves for the Penetration of Drainage
and water supply piping, air vent and mechanical openings at first Division 22 &
215 KHEP-ME-215
floor slab Zone 4B, Cluster
Cluster 75, B2 Zone 4B
23
29-Oct-2017 30-Oct-2017 11:00 AM 31-Oct-2017 A Approved Closed
75, B2
Installation of Vertical Pipe Sleeves for the Penetration of Roof
Drain,Condensate Drain, Vent Pipes, and Block-Outs for Mechanical Division 22 & Approved w/
216 KHEP-ME-216
Opening on the Roof Floor slab
Cluster 5, B2 Zone 1B
23
29-Oct-2017 30-Oct-2017 1:30 PM 31-Oct-2017 B comments
Closed
Zone 1B, Cluster 5, B2
Installation of Vertical Pipe Sleeves for the Penetration of Roof
Drain,Condensate Drain, Vent Pipes, and Block-Outs for Mechanical Division 22 & Approved w/
217 KHEP-ME-217
Opening on the Roof Floor slab
Cluster 7, B2 Zone 1B
23
29-Oct-2017 30-Oct-2017 2:00 PM 31-Oct-2017 B comments
Closed
Zone 1B, Cluster 7, B2
Installation of Sanitary Sewer uPVC pipes From main Line to
manhloes (short piece) 200mm Zone
Line 3 & 4 &
218 KHEP-ME-218 1B, Line 3 & 4 & 5 & 7 & 8, MH-1-L03 and MH-1A-L03 and MH-2-
5&7&8
Zone 1B Division 33 29-Oct-2017 30-Oct-2017 2:30 PM 31-Oct-2017 A Approved Closed
L04 and MH-1-L04 and MH-2-L05 and MH-1-L05 and MH-4-L08 and
MH-3-L08 and MH-1-L07
Installation of Vertical Pipe Sleeves for the Penetration of Vent Pipes
at the Stair Landing Area between Ground and First Floor
219 KHEP-ME-219
Zone 1B, Cluster 19,
Cluster 19 B2 Zone 1B Division 22 30-Oct-2017 31-Oct-2017 10:00 AM 31-Oct-2017 A Approved Closed
B2
Installation of Vertical Pipe Sleeves for the Penetration of Vent Pipes
at the Stair Landing Area between Ground and First Floor
220 KHEP-ME-220
Zone 1B, Cluster 20,
Cluster 20 B2 Zone 1B Division 22 30-Oct-2017 31-Oct-2017 10:00 AM 31-Oct-2017 A Approved Closed
B2
Installation of storm drainage GRP pipes From main Line to manholes
(short piece) 400mm Zone 4B, Line 22, Approved w/
221 KHEP-ME-221
MH-83-L22, 400mm and MH-84-L22 400mm and MH-87-L22, 400mm
Line 22 Zone 4B Division 33 30-Oct-2017 31-Oct-2017 2:30 PM 31-Oct-2017 B comments
Closed
and MH-88-L22 400mm
Installation of Sanitary Sewer uPVC pipes From main Line to
222 KHEP-ME-222 manholes (short piece) 200mm Zone Line 6 & 8 Zone 1B Division 33 30-Oct-2017 31-Oct-2017 2:30 PM 1-Nov-2017 A Approved Closed
1B, Line 6 & 8, MH-1-L06 and MH-1-L08
Inspection of Gravity Lake Test of Underground Drainage System
223 KHEP-ME-223 (UPVC) Installed Inside the Building As Highlighted Zone 1B, Cluster 15 B2 Zone 1B Division 22 30-Oct-2017 31-Oct-2017 9:30 AM 1-Nov-2017 A Approved Closed
Cluster 15, B2, Left Villa
Inspection of Gravity Lake Test of Underground Drainage System
224 KHEP-ME-224 (UPVC) Installed Inside the Building As Highlighted Zone 1A, Cluster 02 A6 Zone 1A Division 22 30-Oct-2017 31-Oct-2017 9:40 AM 1-Nov-2017 A Approved Closed
Cluster 2, A6, Villa 6
Inspection of Gravity Lake Test of Underground Drainage System
225 KHEP-ME-225 (UPVC) Installed Inside the Building As Highlighted Zone 1A, Cluster 01 A6 Zone 1A Division 22 31-Oct-2017 1-Nov-2017 8:30 AM 4-Nov-2017 A Approved Closed
Cluster 1, A6, Villa 1
Inspection of Gravity Lake Test of Underground Drainage System
226 KHEP-ME-226 (UPVC) Installed Inside the Building As Highlighted Zone 1A, Cluster 01 A6 Zone 1A Division 22 31-Oct-2017 1-Nov-2017 9:00 AM 4-Nov-2017 A Approved Closed
Cluster 1, A6, Villa 2
Inspection of Gravity Lake Test of Underground Drainage System
227 KHEP-ME-227 (UPVC) Installed Inside the Building As Highlighted Zone 1A, Cluster 02 A6 Zone 1A Division 22 31-Oct-2017 1-Nov-2017 9:10 AM 4-Nov-2017 A Approved Closed
Cluster 2, A6, Villa 5
Installation of Sanitary Sewer uPVC pipes From main Line to
manholes (short piece) 200mm Zone
228 KHEP-ME-228
1B, Line 31 & 32, MH-3-L31 and MH-2-L31 and MH-1-L31 and MH-
Line 31 & 32 Zone 1B Division 33 1-Nov-2017 2-Nov-2017 2:30 PM 4-Nov-2017 A Approved Closed
1A-L31 and MH-1-L32
Inspection of Gravity Lake Test of Underground Drainage System
229 KHEP-ME-229 (UPVC) Installed Inside the Building As Highlighted Zone 1A, Cluster 02 A6 Zone 1A Division 22 4-Nov-2017 5-Nov-2017 8:30 AM 6-Nov-2017 A Approved Closed
Cluster 2, A6, Villa 4
Inspection of Gravity Lake Test of Underground Drainage System
230 KHEP-ME-230 (UPVC) Installed Inside the Building As Highlighted Zone 1A, Cluster 02 A6 Zone 1A Division 22 4-Nov-2017 5-Nov-2017 8:40 AM 6-Nov-2017 A Approved Closed
Cluster 2, A6, Villa 3
Inspection of Gravity Lake Test of Underground Drainage System
231 KHEP-ME-231 (UPVC) Installed Inside the Building As Highlighted Zone 1A, Cluster 02 A6 Zone 1A Division 22 4-Nov-2017 5-Nov-2017 8:50 AM 7-Nov-2017 A Approved Closed
Cluster 2, A6, Villa 2
Inspection for installation of Underground Drainage System (UPVC)
232 KHEP-ME-232 Installed Inside the Building As Highlighted Zone 1A, Cluster Cluster 02 A6 Zone 1A Division 22 4-Nov-2017 5-Nov-2017 9:50 AM 6-Nov-2017 A Approved Closed
2, A6, Villa 1
Installation of Vertical Pipe Sleeves for the Penetration of Vent Pipes
at the Stair Landing Area between Ground and First Floor
233 KHEP-ME-233
Zone 3B, Cluster 51,
Cluster 51, B2 Zone 3B Division 22 4-Nov-2017 5-Nov-2017 10:00 AM 5-Nov-2017 A Approved Closed
B2
Installation of Vertical Pipe Sleeves for the Penetration of Drainage
and water supply piping, air vent and mechanical openings at first Cluster 61, Division 22
234 KHEP-ME-234
floor slab Zone 3B, Cluster B2
Zone 3B
&23
4-Nov-2017 5-Nov-2017 10:30 AM 5-Nov-2017 A Approved Closed
61, B2
Installation of Sanitary Sewer uPVC pipes From main Line to
manholes (short piece) 200mm Zone
Line 6 & 33 &
235 KHEP-ME-235 1B, Line 6 & 33 & 34, MH-2-L08 and MH-2-L03 and MH-3-L03 and
34
Zone 1B Division 33 4-Nov-2017 5-Nov-2017 2:30 PM 6-Nov-2017 A Approved Closed
MH-1-L33 and MH-1A-L33 and MH-2-L34 and MH-1-L34 and MH-1A-
L34
Installation of Horizontal Pipe Sleeves for the Ground Floor Structural
Beam, and Vertical pipe Sleeves at First Floor Structural Slab for the
Division 22
236 KHEP-ME-236 Penetration of Drainage and water supply piping and Location Cluster 3, A6 Zone 1A
&23
4-Nov-2017 5-Nov-2017 11:00 AM 5-Nov-2017 A Approved Closed
mechanical openings Zone
1A, Cluster 3, A6
Installation of Vertical Pipe Sleeves for the Penetration of Vent Pipes
at the Stair Landing Area between Ground and First Floor
237 KHEP-ME-237
Zone 4B, Cluster 71,
Cluster 71, B2 Zone 4B Division 22 6-Nov-2017 7-Nov-2017 10:00 AM 8-Nov-2017 A Approved Closed
B2
Installation of Vertical Pipe Sleeves for the Penetration of Vent Pipes
at the Stair Landing Area between Ground and First Floor
238 KHEP-ME-238
Zone 3B, Cluster 52,
Cluster 52, B2 Zone 3B Division 22 6-Nov-2017 7-Nov-2017 10:30 AM 8-Nov-2017 A Approved Closed
B2
Installation of Vertical Pipe Sleeves for the Penetration of Vent Pipes
at the Stair Landing Area between Ground and First Floor
239 KHEP-ME-239
Zone 3B, Cluster 54,
Cluster 54, B2 Zone 3B Division 22 6-Nov-2017 7-Nov-2017 11:00 AM 8-Nov-2017 A Approved Closed
B2
Installation of Vertical Pipe Sleeves at First Floor Structural slab for
the Penetration of Drainage and water supply, vent and Locations Cluster 16 Division 22
240 KHEP-ME-240
mechanical openings Zone BC4
Zone 1B
&23
6-Nov-2017 7-Nov-2017 11:30 AM 9-Nov-2017 A Approved Closed
1B, Cluster 16, BC4
Inspection of Gravity Lake Test of Underground Drainage System
241 KHEP-ME-241 (UPVC) Installed Inside the Building As Highlighted Zone 1A, Cluster 02 A6 Zone 1A Division 22 6-Nov-2017 7-Nov-2017 8:30 AM 8-Nov-2017 A Approved Closed
Cluster 2, A6, Villa 1
Installation of Sanitary sewer uPVC Pipes 200mm - Class 4 Zone
242 KHEP-ME-242
4B, Line 1, Main line : from MH-22-L01 ~ MH-21-L01
Line 1 Zone 4B Division 33 8-Nov-2017 9-Nov-2017 2:30 PM 11-Nov-2017 A Approved Closed

Inspection for Gravity test for sanitary sewer uPVC pipes 200mm,
243 KHEP-ME-243 Class 4 Zone Line 1 Zone 1B Division 33 11-Nov-2017 12-Nov-2017 8:30 AM 13-Nov-2017 A Approved Closed
1B, Line 1, Main Line : from MH-22-L01 ~ MH-21-L01
Installation of Sanitary sewer uPVC Pipes From Inspection Chamber
to manhole (Embedded pice) 160mm - Class 4 Zone 1B, Line 3 &
Line 3 & 4 &
244 KHEP-ME-244 4 & 5 & 6 & 7 & 8, MH-2-L03 and MH-3-L03 and MH-2-L04 and MH-
5&6&7&8
Zone 1B Division 33 12-Nov-2017 13-Nov-2017 10:30 AM 14-Nov-2017 A Approved Closed
1-L04 and MH-1-L06 and MH-2-L05 and MH-1-L05 and MH-1-L07
and MH-1-L08 and MH-3-L08 and MH-4-L08

Installation of Vertical Pipe Sleeves for the Penetration of Vent Pipes


at the Stair Landing Area between Ground and First Floor Cluster 9,
245 KHEP-ME-245
Zone 1B, Cluster 9, BC4
Zone 1B Division 22 12-Nov-2017 13-Nov-2017 10:00 AM 14-Nov-2017 A Approved Closed
BC4
Installation of Vertical Pipe Sleeves at First Floor Structural slab for
the Penetration of Drainage and water supply, vent and Locations Cluster 6, Division 22 &
246 KHEP-ME-246
mechanical openings Zone BC4
Zone 1B
23
12-Nov-2017 13-Nov-2017 10:30 AM 15-Nov-2017 E Rejected Closed
1B, Cluster 6, BC4
Installation of Vertical Pipe Sleeves at First Floor Structural slab for
the Penetration of Drainage and water supply, vent and Locations Cluster 6, Division 22 &
246 KHEP-ME-246-01
mechanical openings Zone BC4
Zone 1B
23
18-Nov-2017 19-Nov-2017 10:00 AM 20-Nov-2017 A Approved Closed
1B, Cluster 6, BC4
Installation of Balcony Drain Pipes and Including Floor Gully trap
Approved w/
247 KHEP-ME-247 From First Floor to Ground Floor Zone Cluster 15 B2 Zone 1B Division 22 13-Nov-2017 14-Nov-2017 10:00 AM 15-Nov-2017 B comments
Closed
1B, Cluster 15, B2
Installation of Vertical Pipe Sleeves for the Penetration of Drainage
and water supply piping, Air vent and mechanical openings at First Division 22 &
248 KHEP-ME-248
Floor Slab Zone 1B, Cluster
Cluster 19 B2 Zone 1B
23
13-Nov-2017 14-Nov-2017 10:30 AM 14-Nov-2017 A Approved Closed
19, B2

Installation of Sanitary sewer uPVC Pipes 200mm - Class 4 Zone Approved w/


249 KHEP-ME-249
1B, Line 2, MH-9-L02 and MH-8-L02 and MH-8-L02 and MH-7-L02
Line 2 Zone 1B Division 33 14-Nov-2017 15-Nov-2017 11:30 AM 16-Nov-2017 B comments
Closed

Installation of Sanitary sewer uPVC Pipes 200mm - Class 4 Zone


249.1 KHEP-ME-249-01
1B, Line 2, MH-9-L02 and MH-8-L02 and MH-8-L02 and MH-7-L02
Line 2 Zone 1B Division 33 27-Nov-2017 28-Nov-2017 11:30 AM 29-Nov-2017 A Approved Closed

Installation of storm drainage GRP pipes 500mm


Zone 1B, Line 15, MH-47-L15 and MH-48-L15 and MH-48-
250 KHEP-ME-250
L15 and MH-49-L15 and MH-49-L15 and MH-50-L15 and MH-50-L15
Line 15 Zone 1B Division 33 14-Nov-2017 15-Nov-2017 11:30 AM 16-Nov-2017 A Approved Closed
and MH-51-L15 and MH-51-L15 and MH-52-L15

Installation of Sanitary sewer uPVC Pipes From Inspection Chamber


to Manhole (Embedded Piece) 160mm - Class 4 Zone 1B, Line 31 Line 31 & 32 Approved w/
251 KHEP-ME-251
& 32 & 33 & 34, MH-1A-L31 and MH-1-L31 and MH-2-L31 and MH- & 33 & 34
Zone 1B Division 33 14-Nov-2017 15-Nov-2017 11:30 AM 18-Nov-2017 B comments
Closed
3-L31 and MH-1-L32 and MH-a-L33 and MH-1-L34 and MH-2-L34

Installation of Vertical Pipe Sleeves for the Penetration of Vent Pipes


at the Stair Landing Area between Ground and First Floor
252 KHEP-ME-252
Zone 4B, Cluster 73,
Cluster 73, B2 Zone 4B Division 33 16-Nov-2017 18-Nov-2017 10:00 AM 19-Nov-2017 A Approved Closed
B2
Installation of storm drainage GRP pipes From Main Line to Manhole
(Short Piece) 400mm Zone 1B, Line
253 KHEP-ME-253
15, MH-47-L15 and MH-48-L15 and MH-49-L15 and MH-51-L15 and
Line 15 Zone 1B Division 33 16-Nov-2017 18-Nov-2017 2:30 PM 19-Nov-2017 A Approved Closed
MH-50-L15 and MH-52-L15
Installation of storm drainage GRP pipes 500mm
254 KHEP-ME-254
Zone 2B, Line 9, MH-I25-L09 and MH-26-L08
Line 9 Zone 2B Division 33 16-Nov-2017 18-Nov-2017 1:30 PM 19-Nov-2017 A Approved Closed

Installation of Gully Traps for Balcony Drains at First Floor Cluster 6, Approved w/
255 KHEP-ME-255
Zone 1B, Cluster 6, BC4 BC4
Zone 1B Division 22 18-Nov-2017 19-Nov-2017 10:30 AM 20-Nov-2017 B comments
Closed

Installation of storm drainage GRP pipes 400mm Approved w/


256 KHEP-ME-256
Zone 2B, Line 1, MH-1-L01 to MH-2-L01
Line 1 Zone 2B Division 33 19-Nov-2017 20-Nov-2017 1:30 PM 22-Nov-2017 B comments
Closed

Inspection and Witnessing the Gravity Testing of Balcony Drainage


Including Gully Traps (UPVC) Installed inside the Building As
257 KHEP-ME-257
Highlighted
Cluster 15 B2 Zone 1B Division 22 20-Nov-2017 21-Nov-2017 10:00 AM 23-Nov-2017 E Rejected Closed
Zone 1B, Cluster 15, B2
Installation of the Installation of Balcony Drainage Riser Including
Gully traps (UPVC) Installed Inside the Building As Highlighted Approved w/
258 KHEP-ME-258
Zone 1B, Cluster 14,
Cluster 14 B2 Zone 1B Division 22 20-Nov-2017 21-Nov-2017 10:30 AM 22-Nov-2017 B comments
Closed
B2
Installation of the Installation of Balcony Drainage Riser Including
Gully traps (UPVC) Installed Inside the Building As Highlighted Approved w/
259 KHEP-ME-259
Zone 1B, Cluster 13,
Cluster 13 B2 Zone 1B Division 22 20-Nov-2017 21-Nov-2017 11:00 AM 22-Nov-2017 B comments
Closed
B2
Installation of the Installation of Balcony Drainage Riser Including
Gully traps (UPVC) Installed Inside the Building As Highlighted Approved w/
260 KHEP-ME-260
Zone 1B, Cluster 11,
Cluster 11 B2 Zone 1B Division 22 20-Nov-2017 21-Nov-2017 11:30 AM 22-Nov-2017 B comments
Closed
B2
Installation Gully traps for Balcony Drains at First Floor As
261 KHEP-ME-261 Highlighted Cluster 19 B2 Zone 1B Division 22 20-Nov-2017 21-Nov-2017 1:30 PM 23-Nov-2017 E Rejected Closed
Zone 1B, Cluster 19, B2
Installation Gully traps for Balcony Drains at First Floor As
262 KHEP-ME-262 Highlighted Cluster 48, B2 Zone 3B Division 22 20-Nov-2017 21-Nov-2017 2:00 PM 22-Nov-2017 A Approved Closed
Zone 3B, Cluster 48, B2
Installation Gully traps for Balcony Drains at First Floor As
Approved w/
263 KHEP-ME-263 Highlighted Cluster 20 B2 Zone 1B Division 22 22-Nov-2017 23-Nov-2017 10:00 AM 25-Nov-2017 B comments
Closed
Zone 1B, Cluster 20, B2
Installation of Vertical Pipe Sleeves for the Penetration of Drainage
and water supply piping, Air vent and mechanical openings at First Division 22 &
264 KHEP-ME-264
Floor Slab Zone 3B, Cluster
Cluster 48, B2 Zone 3B
23
22-Nov-2017 23-Nov-2017 10:30 AM 23-Nov-2017 A Approved Closed
48, B2
Installation Gully traps for Balcony Drains at First Floor As
Cluster 16
265 KHEP-ME-265 Highlighted
BC4
Zone 1B Division 22 23-Nov-2017 25-Nov-2017 9:30 AM 26-Nov-2017 A Approved Closed
Zone 1B, Cluster 16, BC4
Installation of Vertical Pipe Sleeves for the Penetration of Drainage
and water supply piping, Air vent and mechanical openings at First Division 22 &
266 KHEP-ME-266
Floor Slab Zone 1B, Cluster
Cluster 20 B2 Zone 1B
23
23-Nov-2017 25-Nov-2017 10:00 AM 26-Nov-2017 A Approved Closed
20, B2
Installation of Vertical Pipe Sleeves for the Penetration of Drainage
and water supply piping, Air vent and mechanical openings at First Division 22 &
267 KHEP-ME-267
Floor Slab Zone 4B, Cluster
Cluster 71, B2 Zone 4B
24
25-Nov-2017 26-Nov-2017 10:00 AM 26-Nov-2017 A Approved Closed
71, B2
Installation Gully traps for Balcony Drains at First Floor As
268 KHEP-ME-268 Highlighted Cluster 71, B2 Zone 4B Division 22 25-Nov-2017 26-Nov-2017 10:30 AM 26-Nov-2017 A Approved Closed
Zone 4B, Cluster 71, B2
Installation Gully traps for Balcony Drains at First Floor As
Cluster 9, Approved w/
269 KHEP-ME-269 Highlighted
BC4
Zone 1B Division 22 26-Nov-2017 27-Nov-2017 9:30 AM 29-Nov-2017 B comments
Closed
Zone 1B, Cluster 9, BC4
Installation of Vertical Pipe Sleeves for the Penetration of Vent Pipes
at the Stair Landing Area between Ground and First Floor
270 KHEP-ME-270
Zone 2B, Cluster 27,
Cluster 27, B2 Zone 2B Division 22 26-Nov-2017 27-Nov-2017 9:30 AM 27-Nov-2017 A Approved Closed
B2

Installation of storm drainage GRP pipes From Main Line to Manhole


271 KHEP-ME-271 (Short Piece) 400mm Zone 1B, Line Line 7 Zone 1B Division 33 27-Nov-2017 28-Nov-2017 2:30 PM 29-Nov-2017 A Approved Closed
7, MH-28-L07 700mm and MH-27-L07 500 & 700 mm

Installation of Sanitary sewer uPVC Pipes 200mm - Class 4 Zone


272 KHEP-ME-272
1B, Line 1, MH-8-L01 and MH-7-L01 and MH-7-L01 and MH-6-L01
Line 1 Zone 1B Division 33 27-Nov-2017 28-Nov-2017 1:30 PM 29-Nov-2017 A Approved Closed

Installation of Gravity Test for Sanitary sewer uPVC Pipes 200mm -


273 KHEP-ME-273 Class 4 Zone 1B, Line Line 2 Zone 1B Division 33 27-Nov-2017 28-Nov-2017 11:30 AM 29-Nov-2017 A Approved Closed
2, MH-9-L02 and MH-7-L02
Installation of Vertical Pipe Sleeves for the Penetration of Drainage
and water supply piping, Air vent and mechanical openings at First Division 22 &
274 KHEP-ME-274
Floor Slab Zone 1A, Cluster 4,
Cluster 4, A6 Zone 1A
23
28-Nov-2017 29-Nov-2017 9:20 AM 30-Nov-2017 E Rejected Closed
A6
Installation of Vertical Pipe Sleeves for the Penetration of Drainage
and water supply piping, Air vent and mechanical openings at First
274.1 KHEP-ME-274-01
Floor Slab Zone 1A, Cluster 4,
Cluster 4, A6 Zone 1A Division 22 3-Dec-2017 4-Dec-2017 10:40 AM 5-Dec-2017 A Approved Closed
A6
Installation Gully traps for Balcony Drains at First Floor As
275 KHEP-ME-275 Highlighted Cluster 4, A6 Zone 1A Division 22 28-Nov-2017 29-Nov-2017 9:30 AM 30-Nov-2017 E Rejected Closed
Zone 1A, Cluster 4, A6
Installation Gully traps for Balcony Drains at First Floor As
Approved w/
275.1 KHEP-ME-275-01 Highlighted Cluster 4, A6 Zone 1A Division 22 3-Dec-2017 4-Dec-2017 10:30 AM 7-Dec-2017 B comments
Closed
Zone 1A, Cluster 4, A6
Installation of storm drainage GRP pipes From Main Line to Manhole
(Short Piece) 400mm & 500mm Zone
276 KHEP-ME-276
1B, Line 8 & 9, MH-26-L08 500mm and MH-I25-L09 500 & 400 mm
Line 8 & 9 Zone 1B Division33 28-Nov-2017 29-Nov-2017 9:30 AM 29-Nov-2017 A Approved Closed
and MH-I24-L09 400mm
Installation of Vertical Pipe Sleeves for the Penetration of Drainage
and water supply piping, Air vent and mechanical openings at First Division 22 &
277 KHEP-ME-277
Floor Slab Zone 2B, Cluster
Cluster 27, B2 Zone 2B
23
29-Nov-2017 30-Nov-2017 10:00 AM 30-Nov-2017 A Approved Closed
27, B2
Installation of Vertical Pipe Sleeves at First Floor Structural for the
Penetration of Drainage and water supply, vent and Location of Cluster 9, Division 22 &
278 KHEP-ME-278
mechanical openings Zone BC4
Zone 1B
23
29-Nov-2017 30-Nov-2017 10:30 AM 30-Nov-2017 A Approved Closed
1B, Cluster 9, BC4

Installation of Back Drop Sanitary sewer uPVC Pipes 200mm - Class


Line 3 & 33 &
279 KHEP-ME-279 4 Zone 1B,
34,
Zone 1B Division 33 29-Nov-2017 30-Nov-2017 11:30 AM 30-Nov-2017 E Rejected Closed
Line 3 & 33 & 34, MH-1A-L34 and MH-1A-L33 and MH-1A-L03

Installation of Back Drop Sanitary sewer uPVC Pipes 200mm - Class


Line 3 & 33 &
279.1 KHEP-ME-279-01 4 Zone 1B,
34,
Zone 1B Division 33 4-Dec-2017 5-Dec-2017 10:00 AM 5-Dec-2017 A Approved Closed
Line 3 & 33 & 34, MH-1A-L34 and MH-1A-L33 and MH-1A-L03

Installation of Gravity Test for Sanitary sewer uPVC Pipes 200mm -


280 KHEP-ME-280 Class 4 Zone 1B, Line Line 1 Zone 1B Division 33 29-Nov-2017 30-Nov-2017 11:00 AM 30-Nov-2017 A Approved Closed
1, MH-8-L01 and MH-6-L01
Installation of Vertical Pipe Sleeves for the Penetration of Drainage
and water supply piping, Air vent and mechanical openings at First Division 22 &
281 KHEP-ME-281
Floor Slab Zone 3B, Cluster
Cluster 51, B2 Zone 3B
23
30-Nov-2017 2-Dec-2017 10:00 AM 2-Dec-2017 A Approved Closed
51, B2
Installation Gully traps for Balcony Drains at First Floor As
282 KHEP-ME-282 Highlighted Cluster 51, B2 Zone 3B Division 22 30-Nov-2017 2-Dec-2017 10:30 AM 2-Dec-2017 A Approved Closed
Zone 3B, Cluster 51, B2
Installation of storm drainage GRP pipes From Main Line to Manhole
(Short Piece) 400mm Zone 2B, Line Line 3 & 4 &
283 KHEP-ME-283
3 & 4 & 5, MH-I7-L03 400mm and MH-I11-L05 400 mm and MH- 5
Zone 2B Division 33 30-Nov-2017 2-Dec-2017 2:30 PM 2-Dec-2017 A Approved Closed
I12-L04 400mm
Installation Gully traps for Balcony Drains at First Floor As
284 KHEP-ME-284 Highlighted Cluster 27, B2 Zone 2B Division 22 2-Dec-2017 3-Dec-2017 10:30 AM 3-Dec-2017 A Approved Closed
Zone 2B, Cluster 27, B2
Exfilration and Leak Test of Sewage Network (Sewage Line uPVC
200mm Class 4 & Manholes) Line 3 & 5 &
285 KHEP-ME-285
Zone 1B, Line 3 & 5 & 4, MH(1A-1,2,3) Line 3, MH(1,2) 4
Zone 1B Division 22 3-Dec-2017 4-Dec-2017 10:30 AM 5-Dec-2017 E Rejected Closed
Line 5, MH(1,2) Line 4
Exfilration and Leak Test of Sewage Network (Sewage Line uPVC
200mm Class 4 & Manholes) Line 3 & 5 &
285.1 KHEP-ME-285-01
Zone 1B, Line 3 & 5 & 4, MH(1A-1,2,3) Line 3, MH(1,2) 4
Zone 1B Division 22 7-Dec-2017 9-Dec-2017 11:00 AM 11-Dec-2017 E Rejected Closed
Line 4, MH(1,2) Line 5
Installation of Vertical Pipe Sleeves for the Penetration of Vent Pipes
at the Stair Landing Area between Ground and First Floor
286 KHEP-ME-286
Zone 2B, Cluster 33,
Cluster 33, B2 Zone 2B Division 22 3-Dec-2017 4-Dec-2017 10:00 AM 4-Dec-2017 A Approved Closed
B2
Installation of Vertical Pipe Sleeves for the Penetration of Drainage
and water supply piping, Air vent and mechanical openings at First Division 22 &
287 KHEP-ME-287
Floor Slab Zone 4B, Cluster
Cluster 73, B2 Zone 4B
23
3-Dec-2017 4-Dec-2017 10:30 AM 4-Dec-2017 A Approved Closed
73, B2
Installation Gully traps for Balcony Drains at First Floor As
288 KHEP-ME-288 Highlighted Cluster 73, B2 Zone 4B Division 22 3-Dec-2017 4-Dec-2017 11:00 AM 5-Dec-2017 A Approved Closed
Zone 4B, Cluster 73, B2
Exfilration and Leak Test of Sewage Network (Sewage Line uPVC
200mm Class 4 & Manholes) Line 8 & 7 & Approved w/
289 KHEP-ME-289
Zone 1B, Line 8 & 7 & 6, MH(1,2,3,4) Line 8, MH(1,3) 6
Zone 1B Division 22 4-Dec-2017 5-Dec-2017 10:30 AM 7-Dec-2017 B comments
Closed
Line 7, MH(1,2) Line 6
Installation Gully traps for Balcony Drains at First Floor As
Approved w/
290 KHEP-ME-290 Highlighted Cluster 01 A6 Zone 1A Division 22 5-Dec-2017 6-Dec-2017 10:00 AM 7-Dec-2017 B comments
Closed
Zone 1A, Cluster 1, A6
Installation of Vertical Pipe Sleeves for the Penetration of Roof Drain,
Condensate Drain, vent Pipes and Block outs for mechanical Division 22 &
291 KHEP-ME-291
openings at Roof Floor Slab
Cluster 8, B2 Zone 1B
23
5-Dec-2017 6-Dec-2017 10:30 AM 7-Dec-2017 A Approved Closed
Zone 1B, Cluster 8, B2
Inspection for the installation of Balcony Drainage Risers Including
Gully Traps (UPVC) Installed Inside the Building As Highlighted
292 KHEP-ME-292
Zone 1B, Cluster 12,
Cluster 12 B2 Zone 1B Division 22 5-Dec-2017 6-Dec-2017 11:00 AM 7-Dec-2017 A Approved Closed
B2
Installation of Vertical Pipe Sleeves for the Penetration of Drainage
and water supply piping, Air vent and mechanical openings at First Division 22 &
293 KHEP-ME-293
Floor Slab Zone 3B, Cluster
Cluster 58, B2 Zone 3B
23
5-Dec-2017 6-Dec-2017 11:30 AM 7-Dec-2017 A Approved Closed
58, B2
Installation of Back Drop Sanitary sewer uPVC Pipes 200mm - Class
294 KHEP-ME-294 4 Zone 1B, Line 2 Zone 1B Division 33 5-Dec-2017 6-Dec-2017 11:30 AM 10-Dec-2017 E Rejected Closed
Line 2, MH-9-L02 and MH-8-L02 and MH-7-L02
Installation of Back Drop Sanitary sewer uPVC Pipes 200mm - Class
294.1 KHEP-ME-294-01 4 Zone 1B, Line 2 Zone 1B Division 33 13-Dec-2017 14-Dec-2017 11:00 AM 16-Dec-2017 E Rejected Closed
Line 2, MH-9-L02 and MH-8-L02
Installation of Back Drop Sanitary sewer uPVC Pipes 200mm - Class
294.2 KHEP-ME-294-02 4 Zone 1B, Line 2 Zone 1B Division 33 17-Dec-2017 18-Dec-2017 11:00 AM 19-Dec-2017 A Approved Closed
Line 2, MH-9-L02 and MH-8-L02 & MH-7-L02
Installation of Sanitary sewer uPVC Pipes 200mm - Class 4 Zone
295 KHEP-ME-295 1B, Line 2, MH-5-L02 to MH-5A-L02 and MH-5A-L02 to MH-4-L-02 Line 2 Zone 1B Division 33 5-Dec-2017 6-Dec-2017 11:30 AM 7-Dec-2017 A Approved Closed
and MH-4-L02 to MH-3-L02
Installation Gully traps for Balcony Drains at First Floor As
Approved w/
296 KHEP-ME-296 Highlighted Cluster 02 A6 Zone 1A Division 22 6-Dec-2017 7-Dec-2017 10:00 AM 9-Dec-2017 B comments
Closed
Zone 1A, Cluster 2, A6
Installation Gully traps for Balcony Drains at First Floor As
297 KHEP-ME-297 Highlighted Cluster 52, B2 Zone 3B Division 22 6-Dec-2017 7-Dec-2017 10:30 AM 7-Dec-2017 A Approved Closed
Zone 3B, Cluster 52, B2
Installation of Vertical Pipe Sleeves for the Penetration of Drainage
and water supply piping, Air vent and mechanical openings at First Division 22 &
298 KHEP-ME-298
Floor Slab Zone 3B, Cluster
Cluster 52, B2 Zone 3B
23
7-Dec-2017 9-Dec-2017 10:00 AM 9-Dec-2017 A Approved Closed
58, B2
Installation of Vertical Pipe Sleeves for the Penetration of Drainage
and water supply piping, Air vent and mechanical openings at First Division 22 &
299 KHEP-ME-299
Floor Slab Zone 2B, Cluster
Cluster 33, B2 Zone 2B
23
9-Nov-2017 10-Dec-2017 10:00 AM 10-Dec-2017 A Approved Closed
33, B2
Installation Gully traps for Balcony Drains at First Floor As
300 KHEP-ME-300 Highlighted Cluster 33, B2 Zone 2B Division 22 9-Nov-2017 10-Dec-2017 10:30 AM 11-Dec-2017 A Approved Closed
Zone 2B, Cluster 33, B2
Installation of Vertical Pipe Sleeves for the Penetration of Vent Pipes
at the Stair Landing Area between Ground and First Floor
301 KHEP-ME-301
Zone 3B, Cluster 63,
Cluster 63, B2 Zone 3B Division 22 10-Nov-2017 11-Dec-2017 10:00 AM 11-Dec-2017 A Approved Closed
B2
Installation of storm drainage GRP pipes 500mm & 400mm
Approved w/
302 KHEP-ME-302 Zone 3B, Line 39 & 20, MH-136-L39 to MH-71- Line 39 & 20 Zone 3B Division 33 10-Nov-2017 11-Dec-2017 1:30 PM 12-Dec-2017 B comments
Closed
L20 and MH-71-L20 to MH-70-L20

Installation of Sanitary sewer uPVC Pipes From main line to Manhole


303 KHEP-ME-303 (Short piece) 200mm - Class 4 Zone 1B, Line 2, Line 2 Zone 1B Division 33 10-Nov-2017 11-Dec-2017 2:00 PM 12-Dec-2017 A Approved Closed
MH-5-L02 and MH-5A-L02 and MH-4-L-02 and MH-3-L02

Installation of storm drainage GRP pipes From main line to Manhole


304 KHEP-ME-304 (Short piece) 400mm Zone 3B, Line Line 39 & 20 Zone 3B Division 33 11-Nov-2017 12-Dec-2017 2:30 PM 13-Dec-2017 A Approved Closed
39 & 20, MH-136-L39 and MH-71-L20 to MH-70-L20

Installation of Vertical Pipe Sleeves for the Penetration of Roof Drain,


Condensate Drain, vent pipe and Block outs for Mechanical openings Division 22 &
305 KHEP-ME-305
at Roof Slab Zone 4B, Cluster
Cluster 75, B2 Zone 4B
23
11-Nov-2017 12-Dec-2017 10:00 AM 13-Dec-2017 A Approved Closed
75, B2
Exfilration and Leak Test of Sewage Network (Sewage Line uPVC
200mm Class 4 & Manholes) Line 3 & 4 &
306 KHEP-ME-306
Zone 1B, Line 3 & 4 & 5, MH(1A,1,2,3,4) Line 3, 5
Zone 1B Division 33 12-Nov-2017 13-Dec-2017 11:00 AM 16-Dec-2017 E Rejected Closed
MH(1,2) Line 4, MH(1,2) Line 5
Installation Gully traps for Balcony Drains at First Floor As
307 KHEP-ME-307 Highlighted Cluster 58, B2 Zone 3B Division 22 12-Nov-2017 13-Dec-2017 10:00 AM 16-Dec-2017 A Approved Closed
Zone 3B, Cluster 58, B2
Inspection of Gravity Test Back Drop Sanitary sewer uPVC Pipes
308 KHEP-ME-308 160mm - Class 4 Line 2 Zone 1B Division 33 13-Dec-2017 14-Dec-2017 1:30 PM 21-Dec-2017 E Rejected Closed
Zone 1B, Line 2, MH-9-L02 and MH-8-L02
Inspection of Gravity Test Back Drop Sanitary sewer uPVC Pipes
308.1 KHEP-ME-308-01 160mm & 200mm - Class 4 Zone 1B, Line 2, MH-9-L02 and MH-8- Line 2 Zone 1B Division 33 24-Dec-2017 25-Dec-2017 10:30 AM 26-Dec-2017 E Rejected Closed
L02 Mh-7-L02
Inspection of Gravity Test Back Drop for Sanitary sewer uPVC Pipes
308.2 KHEP-ME-308-02 160mm & 200mm - Class 4 Zone 1B, Line 2, MH-9-L02 and MH-8- Line 2 Zone 1B Division 33 28-Dec-2017 30-Dec-2017 10:30 AM 31-Dec-2017 A Approved Closed
L02 Mh-7-L02
Inspection of Gravity Test for Sanitary sewer uPVC Pipes 200mm -
309 KHEP-ME-309 Class 4 Line 2 Zone 1B Division 33 14-Dec-2017 16-Dec-2017 10:30 AM 17-Dec-2017 A Approved Closed
Zone 1B, Line 2, MH-5A-L02 and MH-3-L02

Installation of storm drainage GRP pipes From main line to Manhole


310 KHEP-ME-310 (Short piece) 400mm Zone 2B, Line 1 Line 1 & 4 Zone 2B Division 33 16-Dec-2017 17-Dec-2017 10:30 AM 19-Dec-2017 A Approved Closed
& 4, MH-1-L01 and MH-2-L01 to MH-I10-L04 and MH-I13-L04

Installation of Sanitary sewer uPVC Pipes From main line to Manhole


(Short piece) 200mm - Class 4 Zone 2B, Line 12 Line 12 & 11
311 KHEP-ME-311
& 11 & 10, MH-3-L12 and MH-2-L12 and MH-1-L-12 and MH-1-L11 & 10
Zone 2B Division 33 16-Dec-2017 17-Dec-2017 2:00 PM 17-Dec-2017 A Approved Closed
and MH-1-L10
Installation of Back Drop Sanitary sewer uPVC Pipes 160mm - Class
4 Zone 1B
312 KHEP-ME-312
& 2B, Line 2 & 12, MH-5A-L02 and MH-4-L02 and MH-3-L02 and
Line 2 & 12 Zone 1B & 2B Division 33 16-Dec-2017 17-Dec-2017 11:00 AM 19-Dec-2017 A Approved Closed
MH-1-L12
Installation of Vertical Pipe Sleeves for the Penetration of Vent Pipes
at the Stair Landing Area between Ground and First Floor
313 KHEP-ME-313
Zone 2B, Cluster 35,
Cluster 35, B2 Zone 2B Division 22 16-Dec-2017 17-Dec-2017 10:00 AM 17-Dec-2017 A Approved Closed
B2
Installation of Imbedded Domestic Hot and Cold Water Supply Pipes
Embedded on Wall at First Floor As Highlighted
314 KHEP-ME-314
Zone 1B, Cluster 15, B2 (Right
Cluster 15 B2 Zone 1B Division 22 16-Dec-2017 17-Dec-2017 10:30 AM 19-Dec-2017 A Approved Closed
Villa)

Installation of Imbedded Domestic Hot and Cold Water Supply Pipes


315 KHEP-ME-315 Embedded on Wall at First Floor As Highlighted Cluster 01 A6 Zone 1A Division 22 16-Dec-2017 17-Dec-2017 11:00 AM 17-Dec-2017 A Approved Closed
Zone 1A, Cluster 1, A6 (Villa 6)

Inspection of Gravity Test for Sanitary sewer uPVC Pipes 200mm -


316 KHEP-ME-316 Class 4 Zone 1B, Line Line 2 Zone 1B Division 33 16-Dec-2017 17-Dec-2017 10:30 AM 20-Dec-2017 A Approved Closed
2, MH-5A-L02 to MH-5-L02
Installation of Vertical Pipe Sleeves for the Penetration of roof drain,
Division 22 &
317 KHEP-ME-317 vent pipes, & block-outs Mechanical Opening on the roof slab Zone Cluster 19 B2 Zone 1B
23
17-Dec-2017 18-Dec-2017 10:00 AM 19-Dec-2017 A Approved Closed
1B, Cluster 19, B2
Installation of back drop for sanitary sewer uPVC pipes 200mm Class
318 KHEP-ME-318 4 - MH-7-L01 Zone Line 01 Zone 1B Division 33 17-Dec-2017 18-Dec-2017 11:00 AM 19-Dec-2017 A Approved Closed
1B, Line 01
Installation of storm drainage GRP pipes From main line to Manhole
(Short piece) 500mm Zone 2B, Line 1,
319 KHEP-ME-319
7 & 9 , MH-I22-L09 400mm MH-I23-L09 400mm MH-I8-L01 400mm
Line 1, 7 & 9 Zone 2B Division 33 17-Dec-2017 18-Dec-2017 11:30 AM 20-Dec-2017 A Approved Closed
& 500mm MH-20-L07 500mm
Installation of underground drainage system connection waste &
vent line below ground floor kitchen area high lighted section Axix Division 22,
320 KHEP-ME-320
3,4 C,D Cluster
Cluster 69 Zone 4B
23
18-Dec-2017 19-Dec-2017 10:00 AM 20-Dec-2017 E Rejected Closed
69,B2 Zone 4B
Installation of underground drainage system connection waste &
vent line below ground floor laundry area high lighted section Axix Division 22,
321 KHEP-ME-321
3,4 C,D Cluster
Cluster 69 Zone 4B
23
18-Dec-2017 19-Dec-2017 10:10 AM 20-Dec-2017 E Rejected Closed
69,B2 Zone 4B
Installation of underground drainage system connection waste &
vent line below ground floor bathroom area high lighted section Axix Division 22,
322 KHEP-ME-322
3,4 C,D Cluster
Cluster 69 Zone 4B
23
18-Dec-2017 19-Dec-2017 10:15 AM 21-Dec-2017 E Rejected Closed
69,B2 Zone 4B

Installation of under slab drainage system connection below first


floor to underground floor including rizer line soil waste & vent line Division 22, Approved w/
323 KHEP-ME-323
bathroom area high lighted section Axix 4,5 E,D
Cluster 69 Zone 4B
23
18-Dec-2017 19-Dec-2017 10:20 AM 21-Dec-2017 B comments
Closed
Cluster 69,B2 Zone 4B

Inspection of Gravity Test for Storm Drainage GRP Pipes 500mm


324 KHEP-ME-324 Zone 1B, Line Line 15 Zone 1B Division 33 19-Dec-2017 20-Dec-2017 10:30 AM 21-Dec-2017 E Rejected Closed
15, MH-49-L15 to MH-50-L15
Inspection of Gravity Test for Storm Drainage GRP Pipes 500mm
324.01 KHEP-ME-324-01 Zone 1B, Line Line 15 Zone 1B Division 33 20-Feb-2018 21-Feb-2018 10:10 AM 24-Feb-2018 A Approved Closed
15, MH-49-L15 to MH-50-L15
Inspection of Gravity Test for Sanitary Sewer uPVC Pipes 200mm -
Class 4
325 KHEP-ME-325 RECALLED
Zone 1B Line 34
MH-2-L34 to MH-1-A-L34
Installation of Sanitary Sewer uPVC Pipes from main line to Manhole
Short Piece 200mm - Class 4
326 KHEP-ME-326
Zone 2B Line 02,08
Line 02,08 Zone 2B Division 33 24-Dec-2017 25-Dec-2017 11:00 AM 27-Dec-2017 A Approved Closed
MH-7-L02 to MH-1-L08
Installation of Vertical Pipe Sleeves for the Penetration of roof Drain,
Condensate Drain, Vent Pipes & Blockouts for Mechanical Opening on Division 22 &
327 KHEP-ME-327
the Roof Slab
Cluster 61, B2 Zone 3B
23
20-Dec-2017 21-Dec-2017 10:00 AM 24-Dec-2017 A Approved Closed
Zone 3B Cluster 61, B2

Inspection of Gravity Test Back Drop Sanitary sewer uPVC Pipes


328 KHEP-ME-328
160mm Class 4 Zone 1B Line 02 MH-5-A-L02 MH-4-L02 MH-3-L02
Line 02 Zone 1B Division 33 24-Dec-2017 25-Dec-2017 10:30 AM 26-Dec-2017 A Approved Closed

Installation of Vertical Pipe Sleeves for the Penetration of vent pipes


Cluster 21,
329 KHEP-ME-329 at the Stair Landing Area Between Ground and First Floor Zone 1B,
BC4
Zone 1B Division 22 24-Dec-2017 25-Dec-2017 10:00 AM 27-Dec-2017 A Approved Closed
Cluster 21, BC4
Installation of Vertical Pipe Sleeves for the Penetration of roof Drain
Division 22 &
330 KHEP-ME-330 Condensate Drain Vent Pipes and Block Out for Mechanical Opening Cluster 20 B2 Zone 1B
23
24-Dec-2017 25-Dec-2017 2:30 PM 27-Dec-2017 A Approved Closed
on the Roof Slab Zone 1B Cluster 20 B2
Inspection for the installation of Balcony Drainage Risers Including
Gully Traps (UPVC) Installed Inside the Building As Highlighted
331 KHEP-ME-331
Zone 1B, Cluster 10,
Cluster 10 B2 Zone 1B Division 22 25-Dec-2017 26-Dec-2017 10:00 AM 27-Dec-2017 A Approved Closed
B2
Inspection for the installation of Balcony Drainage Risers Including
Gully Traps (UPVC) Installed Inside the Building As Highlighted
332 KHEP-ME-332
Zone 1B, Cluster 5, B2
Cluster 5, B2 Zone 1B Division 22 25-Dec-2017 26-Dec-2017 10:30 AM 27-Dec-2017 A Approved Closed

Installation of Vertical Pipe Sleeves for the Penetration of roof Drain


Division 22 &
333 KHEP-ME-333 Condensate Drain Vent Pipes and Block Out for Mechanical Opening Cluster 3 A6 Zone 1A
23
25-Dec-2017 26-Dec-2017 11:00 AM 27-Dec-2017 A Approved Closed
on the Roof Slab Zone 1A Cluster 3 A6

Installation of Embedded PPR pipe on the wall for water supply


334 KHEP-ME-334 system at ground floor hot & cold med's room as highlighted section Cluster 69, B2 Zone 4B Division 22 25-Dec-2017 26-Dec-2017 8:30 AM 28-Dec-2017 A Approved Closed
Axis3,4 C,D Zone 4B Cluster 69, B2 Right Villa

Installation of Embedded PPR pipe on the wall for water supply


Approved w/
335 KHEP-ME-335 system at ground floor hot & cold Flex room as highlighted section Cluster 69, B2 Zone 4B Division 22 25-Dec-2017 26-Dec-2017 8:50 AM 27-Dec-2017 B comments
Closed
Axis5,6 C,D Zone 4B Cluster 69, B2 Right Villa

Installation of Embedded PPR pipe on the wall for water supply


Approved w/
336 KHEP-ME-336 system at ground floor hot & cold Power room as highlighted section Cluster 69, B2 Zone 4B Division 22 25-Dec-2017 26-Dec-2017 8:40 AM 27-Dec-2017 B comments
Closed
Axis4,5 C,D Zone 4B Cluster 69, B2 Right Villa

Inspection of Gravity Test Back Drop Sanitary sewer uPVC Pipes


337 KHEP-ME-337 160mm & 200mm - Class 4 Zone 1B, Line 2, MH-9-L02 and Mh-7- Line 2 Zone 1B Division 33 26-Dec-2017 27-Dec-2017 10:30 AM RECALLED
L02
Installation of Gully Traps for Balcony Drains at First Floor as
338 KHEP-ME-338
Highlighted Zone 2B, Cluster 35, B2
Cluster 35, B2 Zone 2B Division 22 26-Dec-2017 27-Dec-2017 10:00 AM 28-Dec-2017 A Approved Closed

Installation of Gully Traps for Balcony Drains at First Floor as


339 KHEP-ME-339
Highlighted Zone 2B, Cluster 34, B2
Cluster 34, B2 Zone 2B Division 22 26-Dec-2017 27-Dec-2017 10:30 AM 28-Dec-2017 A Approved Closed

Installation of Vertical Pipe Sleeves for the Penetration of Drainage &


Division 22 &
340 KHEP-ME-340 Water Supply Piping, Air Vent & Mechanical Openings at First Floor Cluster 35 B2 Zone 2B
23
26-Dec-2017 27-Dec-2017 10:00 AM 28-Dec-2017 A Approved Closed
Slab Zone 2B Cluster 35 B2
Installation of Horizonal Pipe Sleeves at the Ground Floor Structural
Beam & Vertical Pipe Sleeves at First Floor Structural Slab for the Division 22 &
341 KHEP-ME-341
Penetration of Drainage Water Supply & Location of Mechanical
Cluster 81 A6 Zone 4A
23
26-Dec-2017 27-Dec-2017 11:00 AM 28-Dec-2017 A Approved Closed
Openings Zone 4A Cluster 81 A6
Installation of Gully Traps for Balcony Drains at First Floor as Cluster 81, Division 22 &
342 KHEP-ME-342
Highlighted Zone A4, Cluster 81, A6 A6
Zone 4A
23
26-Dec-2017 27-Dec-2017 11:00 AM 28-Dec-2017 A Approved Closed

Installation of Vertical Pipe Sleeves for the Penetration of Vent Pipes


343 KHEP-ME-343 at the Stair Landing Area Between Ground & First Floor Zone 3B Cluster 64 B2 Zone 3B Division 22 26-Dec-2017 27-Dec-2017 11:30 AM 28-Dec-2017 A Approved Closed
Cluster 64 B2

Installation of Vertical Pipe Sleeves for the Penetration of Drainage &


Division 22 &
344 KHEP-ME-344 Water Supply Piping, Air Vent & Mechanical Openings at Stair Cluster 34 B2 Zone 2B
23
26-Dec-2017 27-Dec-2017 10:00 AM 28-Dec-2017 A Approved Closed
Landings & First Floor Slab Zone 2B Cluster 34 B2
Inspection of Gravity Test Back Drop Sanitary sewer uPVC Pipes
345 KHEP-ME-345
160mm Class 4 Zone 1B, Line 33,34, MH-1-A-L33 and MH-1-A-L34
Line 33,34 Zone 1B Division 33 26-Dec-2017 27-Dec-2017 9:30 AM 28-Dec-2017 E Rejected Closed

Inspection of Gravity Test Back Drop Sanitary sewer uPVC Pipes


345.1 KHEP-ME-345-01
160mm Class 4 Zone 1B, Line 33,34, MH-1-A-L33 and MH-1-A-L34
Line 33,34 Zone 1B Division 33 28-Dec-2017 30-Dec-2017 9:30 AM 31-Dec-2017 A Approved Closed

Inspection of Gravity Test of Sanitary sewer uPVC Pipes 200mm


346 KHEP-ME-346
Class 4 Zone 1B, Line 34, MH-1-A-L34 and MH-7-A-L02
Line 34 Zone 1B Division 33 26-Dec-2017 27-Dec-2017 9:45 AM 28-Dec-2017 A Approved Closed

Installation of Embedded UPVC Pipe on the wall for Drainage System


347 KHEP-ME-347 at ground floor Soil, West, Vent Power Room as higlighted section , Cluster 69 B2 Zone 4B Division 22 27-Dec-2017 28-Dec-2017 9:00 AM 30-Dec-2017 A Approved Closed
Axis 4,5 C,D Zone 4B Cluster 69 B2
Installation of Embedded UPVC Pipe on the wall for Drainage System
348 KHEP-ME-348 at ground floor Soil, West, Vent Med Room as higlighted section , Cluster 69 B2 Zone 4B Division 22 27-Dec-2017 28-Dec-2017 9:10 AM 30-Dec-2017 A Approved Closed
Axis 3,4 C,D Zone 4B Cluster 69 B2

Installation of Embedded UPVC Pipe on the wall & Underground for


349 KHEP-ME-349 Drainage System at ground floor West, CD Flex Room as higlighted Cluster 69 B2 Zone 4B Division 22 30-Dec-2017 31-Dec-2017 9:20 AM 1-Jan-2018 A Approved Closed
section , Axis 5,6 C,D Zone 4B Cluster 69 B2

Installation UPVC Pipe Rizer From First Floor to Ground Floor


350 KHEP-ME-350 Drainage System Vent & CD as higlighted section , Axis 3,5 C,D Cluster 69 B2 Zone 4B Division 22 27-Dec-2017 28-Dec-2017 11:30 AM 30-Dec-2017 A Approved Closed
Zone 4B Cluster 69 B2
Inspection for Gravity Test Back Drop for Sanitary sewer uPVC Pipes
351 KHEP-ME-351
160mm Class 4 Zone 1B Line 3 MH-1A-L03
Zone 1B Line 8 Division 33 27-Dec-2017 28-Dec-2017 9:30 AM 30-Dec-2017 E Rejected Closed

Inspection for Gravity Test Back Drop for Sanitary sewer uPVC Pipes
351.1 KHEP-ME-351-01
160mm Class 4 Zone 1B Line 3 MH-1A-L03
Zone 1B Line 3 Division 33 30-Dec-2017 31-Dec-2017 9:00 AM 1-Jan-2018 E Rejected Closed

Inspection for Gravity Test Back Drop for Sanitary sewer uPVC Pipes
351.2 KHEP-ME-351-02
160mm Class 4 Zone 1B Line 3 MH-1A-L03
Zone 1B Line 3 Division 33 2-Jan-2018 3-Jan-2018 9:10 AM 4-Jan-2018 A Approved Closed

Inspection for Gravity Test for Sanitary sewer uPVC Pipes 200mm
352 KHEP-ME-352 Class 4 Zone 1B Line 34 MH-2-L34 MH-1-L34 & MH-1-L34 MH-1A- Zone 1B Line 34 Division 33 27-Dec-2017 28-Dec-2017 9:45 AM 30-Dec-2017 E Rejected Closed
L34
Inspection for Gravity Test for Sanitary sewer uPVC Pipes 200mm
352.1 KHEP-ME-352-01 Class 4 Zone 1B Line 34 MH-2-L34 MH-1-L34 & MH-1-L34 MH-1A- Zone 1B Line 34 Division 33 30-Dec-2017 31-Dec-2017 9:10 AM 1-Jan-2018 A Approved Closed
L34
Installation of Embedded PPR on the wall for water supply system at
353 KHEP-ME-353 first floor Hot & Cold Master bedroom Axis 5,6 E,D Zone 4B Cluster Cluster 69 B2 Zone 4B Division 22 28-Dec-2017 30-Dec-2017 8:50 AM 31-Dec-2017 A Approved Closed
69 B2

Installation of Embedded PPR on the wall for water supply system at


354 KHEP-ME-354
first floor Hot & Cold bedroom 1 Axis 5,6 E,D Zone 4B Cluster 69 B2
Cluster 69 B2 Zone 4B Division 22 28-Dec-2017 30-Dec-2017 9:00 AM 31-Dec-2017 A Approved Closed

Installation of Vertical Pipe Sleeves for the Penetration of Roof


Drains, Condensate Drains and Vent Pipes & Blackout for Machanical
Division 22 &
355 KHEP-ME-355 Openings on the roof Slab Cluster 48, B2 Zone 3B
23
28-Dec-2017 30-Dec-2017 10:00 AM 31-Dec-2017 A Approved Closed
Zone 3B,
Cluster 48, B2
Installation of Embedded UPVC Pipe on the wall for Drainage System
356 KHEP-ME-356 at First floor Soil, West, Vent master bedroom as higlighted section , Cluster 69 B2 Zone 4B Division 22 28-Dec-2017 30-Dec-2017 9:20 AM 31-Dec-2017 A Approved Closed
Axis 5,6 D,E Zone 4B Cluster 69 B2
Installation of Embedded UPVC Pipe on the wall for Drainage System
357 KHEP-ME-357 at First floor Soil, West, Vent Bedroom 1 as higlighted section , Axis Cluster 69 B2 Zone 4B Division 22 28-Dec-2017 30-Dec-2017 9:30 AM 31-Dec-2017 A Approved Closed
5,6 D,E Zone 4B Cluster 69 B2
Installation of Embedded UPVC Pipe on the wall for Drainage System
358 KHEP-ME-358 at First floor CD, West, Vent Family room as higlighted section , Axis Cluster 69 B2 Zone 4B Division 22 28-Dec-2017 30-Dec-2017 9:40 AM 31-Dec-2017 A Approved Closed
5,6 C,D Zone 4B Cluster 69 B2
Installation UPVC Pipe Rizer From Ground Floor to First Floor for vent
359 KHEP-ME-359 System Vent pipe stair area as higlighted section , Axis 4,5 C,D Zone Cluster 69 B2 Zone 4B Division 22 28-Dec-2017 30-Dec-2017 10:00 AM 31-Dec-2017 A Approved Closed
4B Cluster 69 B2
Inspection of Gravity Test for Sanitary Sewer UPVC Pipes 200mm
360 KHEP-ME-360 Class 4 Zone 1B Line 33 MH-1-L33 MH-1-A-L33 - MH-1-A-L33 MH-1- Line 33 Zone 1B Division 33 28-Dec-2017 30-Dec-2017 9:45 AM 31-Dec-2017 A Approved Closed
L34
Installation of Sanitary Sewer uPVC from main line to Manhole Short
361 KHEP-ME-361 Piece 200mm - Class 4 Zone 4B Line 1 MH-16-L01 MH-17-L01 MH- Line 1 Zone 4B Division 33 28-Dec-2017 30-Dec-2017 11:00 AM 31-Dec-2017 A Approved Closed
18-L01 MH-19-L01 & MH-21-L01
Installation of DCW Riser PPR Pipe from Ground Floor to First Floor
362 KHEP-ME-362 Serving Family room wash basin as highlighted section Axis 5,6 C,D Cluster 69, B2 Zone 4B Division 22 28-Dec-2017 30-Dec-2017 10:10 AM 31-Dec-2017 A Approved Closed
Zone 4B Cluster 69, B2
Installation UPVC Pipe Rizer From Roof Floor to Ground Floor for
363 KHEP-ME-363 Drainage System Rain Water Pipe as higlighted section Zone 4B Cluster 15 B2 Zone 4B Division 22 31-Dec-2017 1-Jan-2018 10:10 AM 2-Jan-2018 A Approved Closed
Cluster 15 B2
Installation UPVC Pipe Rizer From Roof Floor to Ground Floor for
364 KHEP-ME-364 Drainage System Rain Water Pipe as higlighted section Zone 4B Cluster 01 A6 Zone 4B Division 22 31-Dec-2017 1-Jan-2018 9:50 AM 2-Jan-2018 A Approved Closed
Cluster 1 A6
Inspection of Gravity Test for Sanitary Sewer UPVC Pipes 200mm
365 KHEP-ME-365
Class 4 Short Pics Zone 1B Line 3 MH-3-L03 MH-2-L03
Line 3 Zone 1B Division 33 31-Dec-2017 1-Jan-2018 9:00 AM 2-Jan-2018 A Approved Closed

Inspection of Gravity Test for Sanitary Sewer UPVC Pipes 200mm


366 KHEP-ME-366
Class 4 Short Pics Zone 1B Line 1 MH-1-L08 MH-7-L01
Line 1 Zone 1B Division 33 31-Dec-2017 1-Jan-2018 9:15 AM 2-Jan-2018 A Approved Closed

Inspection for Installation for Sanitary sewer uPVC Pipes 200mm


367 KHEP-ME-367
Class 4 Line 1 at Zone 1B MH-6-L01 to MH-5-L01
Line 1 Zone 1B Division 33 31-Dec-2017 1-Jan-2018 9:30 AM 2-Jan-2018 A Approved Closed

Inspection for Installation for Storm Pipes Short Piec + Imbedded


368 KHEP-ME-368
Piec 400mm Line 9 Zone 2B MH-I23-L09
Line 9 Zone 2B Division 33 31-Dec-2017 1-Jan-2018 9:40 AM 2-Jan-2018 A Approved Closed

Inspection of Gravity Test for Sanitary Sewer UPVC Pipes 200mm


369 KHEP-ME-369
Class 4 Short Pics Zone 1B Line 4 MH-1-L04 - MH-1-L03
Line 4 & 5 Zone 1B Division 33 1-Jan-2018 2-Jan-2018 9:00 AM 3-Jan-2018 A Approved Closed

Insoection for Gravity Test for Sanitary sewer uPVC Pipes 200mm
370 KHEP-ME-370 Class Short Piec at Zone 1B Line 31 MH-3-L31 to MH-2-L31 to MH-1- Line 31 Zone 1B Division 33 1-Jan-2018 2-Jan-2018 9:15 AM 4-Jan-2018 A Approved Closed
L31 to MH-1-A-L31
Installation uPVC Pipe ofFloor Drain Connection for Drainage System
371 KHEP-ME-371 at Ground Floor West Vent CD Villa 6 as highlighted Section Axis 1,6 Cluster 02 A6 Zone 1A Division 22 4-Jan-2018 6-Jan-2018 9:10 AM 7-Jan-2018 A Approved Closed
A,C Zone 1A Cluster 2 A6
Installation uPVC Pipe of FD Connection for Drainage System at
372 KHEP-ME-372 Ground Floor West Vent CD Villa 5 as highlighted Section Axis 1,6 Cluster 02 A6 Zone 1A Division 22 3-Jan-2018 4-Jan-2018 9:10 AM 7-Jan-2018 A Approved Closed
C,E Zone 1A Cluster 2 A6
Installation uPVC Pipe of FD Connection for Drainage System at
373 KHEP-ME-373 Ground Floor West Vent CD Villa 4 as highlighted Section Axis 1,6 Cluster 02 A6 Zone 1A Division 22 3-Jan-2018 4-Jan-2018 9:15 AM 6-Jan-2018 A Approved Closed
E,G Zone 1A Cluster 2 A6
Installation uPVC Pipe of FD Connection for Drainage System at
374 KHEP-ME-374 Ground Floor West Vent CD Villa 3 as highlighted Section Axis 1,6 G,I Cluster 02 A6 Zone 1A Division 22 3-Jan-2018 4-Jan-2018 9:20 AM 6-Jan-2018 A Approved Closed
Zone 1A Cluster 2 A6
Inspection of Gravity Test for Sanitary Sewer UPVC Pipes 200mm
375 KHEP-ME-375 Class 4 Short Pics Zone 1B Line 5 MH-1-L04 - MH-1-L05 & MH-1-L05 Line 5 Zone 1B Division 33 3-Jan-2018 4-Jan-2018 9:00 AM 9-Jan-2018 A Approved Closed
MH-2-L05
Installation UPVC Pipe Rizer From Roof Floor to Ground Floor for
376 KHEP-ME-376 Drainage System Rain Water Pipe as higlighted section Zone 1A Cluster 02 A6 Zone 1A Division 22 3-Jan-2018 4-Jan-2018 10:00 AM 6-Jan-2018 A Approved Closed
Cluster 2 A6
Installation of Gravity Traps for Balcony Drains at First Floor as Cluster 21
377 KHEP-ME-377
Highlighted Zone 2B Cluster 21 BC4 BC4
Zone 2B Division 22 3-Jan-2018 4-Jan-2018 10:10 AM 7-Jan-2018 A Approved Closed

Installation of Gully Traps for Balcony Drains at First Floor as


378 KHEP-ME-378
Highlighted Zone 2B Cluster 72 B2
Cluster 72 B2 Zone 2B Division 22 3-Jan-2018 4-Jan-2018 10:20 AM 7-Jan-2018 A Approved Closed

Inspection of Installation for Sanitary sewer UPVC Pipes 200mm


379 KHEP-ME-379
Class 4 Short Piec at Zone 5A Line 1 MH-5-L01 to MH-6-L01 Zone 1B
Line 1 Zone 5A Division 33 4-Jan-2018 6-Jan-2018 9:00 AM 7-Jan-2018 A Approved Closed

Inspection for Gravity test for Sanitary sewer UPVC Pipes 200mm
380 KHEP-ME-380
Class 4 short Piec at Zone 5A Line 1 MH-5-L01 to MH-6-L01
Line 1 Zone 5A Division 33 4-Jan-2018 6-Jan-2018 9:15 AM 7-Jan-2018 A Approved Closed

Inspection for Leak test for Sanitary Sewer Manholes Zone 1B Line
381 KHEP-ME-381 33 MH-1-L33 MH-1A-L33 & Line 34 MH-1-L34 MH-2-L34 MH-2-L34 Line 33, 34 Zone 1B Division 33 4-Jan-2018 6-Jan-2018 9:15 AM 7-Jan-2018 A Approved Closed
MH-1A-L34

Inspection for Leak test for Sanitary Sewer Manholes Zone 1B Line
382 KHEP-ME-382
31 MH-1-L31 MH-1-A-L31 MH-2-L31 MH-2-L31 Zone 1B
Line 31 Zone 1B Division 33 6-Jan-2018 7-Jan-2018 9:10 AM 9-Jan-2018 E Rejected Closed

Inspection for Leak test for Sanitary Sewer Manholes At Zone 1B


382.1 KHEP-ME-382-01
Line 31 ( MH-1-L31 MH-1-A-L31 MH-2-L31 MH-3-L31 )
Line 31 Zone 1B Division 33,34 11-Jan-2018 13-Jan-2018 10:15 AM 14-Jan-2018 A Approved Closed

Inspection for Leak test for Sanitary Sewer Manholes Zone 1B Line 3
383 KHEP-ME-383
MH-3-L03 MH-2-L03 MH-1-L03 Line 4 MH-2-L04 Mh-1-L04 Zone 1B
Line 3, 4 Zone 1B Division 33 6-Jan-2018 7-Jan-2018 9:15 AM 9-Jan-2018 E Rejected Closed

Inspection for Leak test for Sanitary Sewer Manholes At Zone 1B


383.1 KHEP-ME-383-01
Line 3&4 ( MH-3-L03 MH-2-L03 MH-1-L03 & MH-2-L04 MH-1-L04)
Line 3, 4 Zone 1B Division 33 11-Jan-2018 13-Jan-2018 10:15 AM 14-Jan-2018 A Approved Closed

Gravity Test for uPVC Pipe waste Floor Drain connection & waste
384 KHEP-ME-384 Pipe for Drainage System at Ground Floor Waste, FD, CD Villa 6 as Cluster 02 A6 Zone 1A Division 22 7-Jan-2018 8-Jan-2018 9:00 AM 9-Jan-2018 A Approved Closed
highlighted sections Axis 1,6 A,C Zone 1A Cluster 2 A6
Gravity Test for uPVC Pipe waste Floor Drain connection & waste
385 KHEP-ME-385 Pipe for Drainage System at Ground Floor Waste, FD, CD Villa 5 as Cluster 02 A6 Zone 1A Division 22 7-Jan-2018 8-Jan-2018 9:10 AM 9-Jan-2018 A Approved Closed
highlighted sections Axis 1,6 C, E Zone 1A Cluster 2 A6

Gravity Test for uPVC Pipe waste Floor Drain connection & waste
386 KHEP-ME-386 Pipe for Drainage System at Ground Floor Waste, FD, CD Villa 4 as Cluster 02 A6 Zone 1A Division 22 7-Jan-2018 8-Jan-2018 9:20 AM 9-Jan-2018 A Approved Closed
highlighted sections Axis 1,6 E, G Zone 1A Cluster 2 A6

Gravity Test for uPVC Pipe waste Floor Drain connection & waste
387 KHEP-ME-387 Pipe for Drainage System at Ground Floor Waste, FD, CD Villa 3 as Cluster 02 A6 Zone 1A Division 22 7-Jan-2018 8-Jan-2018 9:30 AM 9-Jan-2018 A Approved Closed
highlighted sections Axis 1,6 G, J Zone 1A Cluster 2 A6

Istallation of Vertical Pipe Sleeves for the Preparation of Drainage,


Roof Drains, Vent Pipes & blockouts for Mechanical Opening on the
388 KHEP-ME-388
first floor & vent Pipes at the Stair Landing Area Zone 4B Cluster 72
Cluster 72 B2 Zone 4B Division 22 7-Jan-2018 8-Jan-2018 9:30 AM 9-Jan-2018 A Approved Closed
B2

Inspection for Installation for Storm Pipes Short Piec + Imbedded


389 KHEP-ME-389
Piec 500mm Line 7 Zone 2B MH-27-L07 as highlighted
Line 07 Zone 2B Division 33 8-Jan-2018 9-Jan-2018 9:00 AM 11-Jan-2018 A Approved Closed

Installation of Back Drop Sanitary sewer uPVC Pipes 200mm Class 4


390 KHEP-ME-390
Zone 1B Line 1 at MH-5-L01 as highlighted
Line 01 Zone 1B Division 33 8-Jan-2018 9-Jan-2018 9:10 AM 10-Jan-2018 A Approved Closed

Inspection for the belcony drainage risers including gully traps UPVC
391 KHEP-ME-391
installed unside the building as highlighted Zone 4B Cluster 68 B2
Cluster 68 B2 Zone 4B Division 22 8-Jan-2018 9-Jan-2018 9:40 AM 11-Jan-2018 E Rejected Closed

Installation of underground drainage system soil, waste & vent below


392 KHEP-ME-392
ground floor structural slab as highlighted Zone 1B Cluster 14 B2
Cluster 14 B2 Zone 1B Division 22 8-Jan-2018 9-Jan-2018 9:45 AM 11-Jan-2018 A Approved Closed

Installation of vertical pipe sleeves for the penetration of roof drain


Division 22 &
393 KHEP-ME-393 condensate drain vent pipes & block outs for mechanical opening on Cluster 51 B2 Zone 3B
23
8-Jan-2018 9-Jan-2018 10:00 AM 10-Jan-2018 A Approved Closed
the roof slab Zone 3B Cluster 51 B2
Installation of Underground Drainage system soil, waste & vent
394 KHEP-ME-394 below ground floor structural slab as highlighted Zone 1B Cluster 13 Cluster 13 B2 Zone 1B Division 22 10-Jan-2018 11-Jan-2018 9:40 AM 13-Jan-2018 A Approved Closed
B2
Inspection for Gravity Leak test of underground Drainage system
395 KHEP-ME-395 uPVC installed inside the Buildings as highlighted Cluster 14 B2 Zone Cluster 14 B2 Zone 1B Division 22 10-Jan-2018 11-Jan-2018 9:15 AM 16-Jan-2018 A Approved Closed
1B
Inspection for Gravity test for Sanitary sewer sewer uPVC Pipes
396 KHEP-ME-396 200mm Class 4 Short pics + Back drop at Zone 1B Line 3 MH-5-L01 Line 01 Zone 1B Division 33 10-Jan-2018 11-Jan-2018 9:00 AM 16-Jan-2018 A Approved Closed
to MH-1-A-L03
Installation of vertical pipe sleeves for the Preparation of Drainage &
Division 22 &
397 KHEP-ME-397 water Supply Piping , Air Vent & Mechanical Openings at first floor Cluster 54 B2 Zone 3B
23
10-Jan-2018 11-Jan-2018 10:00 AM 13-Jan-2018 A Approved Closed
Slab Cluster 54 B2 Zone 3B
Installation of Gully Traps for Balcony Drains at first floor as
398 KHEP-ME-398
Highlighted Zone 3B Cluster 54 B2
Cluster 54 B2 Zone 3B Division 22 10-Jan-2018 11-Jan-2018 10:00 AM 14-Jan-2018 A Approved Closed

Installation of Gully Traps for Balcony Drains at first floor as


399 KHEP-ME-399
Highlighted Zone 2B Cluster 30 B2
Cluster 30 B2 Zone 2B Division 22 10-Jan-2018 11-Jan-2018 10:30 AM 14-Jan-2018 A Approved Closed

Inspection for Leak test for Storm Drainage GRP Pipes And
400 KHEP-ME-400 Manholes Ø 500mm Zone 1B Line 15 Main Line:From MH-47-L15~ Line 15 Zone 1B Division 33 18-Jan-2018 20-Jan-2018 11:00 AM 21-Jan-2018 A Approved Closed
MH-48-L15 Main Line:From MH-48-L15~ MH-49-L15
Inspection for Leak test for Storm Drainage GRP Pipes And
Manholes Ø 400mm Zone 1B Line 13 Main Line:From MH-I39-L13~
401 KHEP-ME-401
MH-I40-L13 / Main Line:From MH-I40-L13~ MH-I41-L13 / Main
Line 13 Zone 1B Division 33 15-Jan-2018 16-Jan-2018 11:00 AM 20-Jan-2018 A Approved Closed
Line:From MH-I41-L13~ MH-I42-L13
Inspection for Leak test for Storm Drainage GRP Pipes And
402 KHEP-ME-402 Manholes Ø 400mm Zone 1B Line 11 Main Line:From MH-I33-L11~ Line 11 Zone 1B Division 33 15-Jan-2018 16-Jan-2018 11:00 AM 20-Jan-2018 A Approved Closed
MH-I34-L11
Insoection for Leak test for Sanitary Sewer Manholes at Zone 1B Line
403 KHEP-ME-403
1 MH-5-L01
Line 1 Zone 1B Division 33 11-Jan-2018 13-Jan-2018 10:15 AM 14-Jan-2018 A Approved Closed

Installation of Sanitary Sewer uPVC Pipes From main line to Manhole


404 KHEP-ME-404 (Short piece) Ø 200mm - Class 4 Zone 1B Line 12 MH-1-L12 MH-2- Line 12 Zone 1B Division 33 13-Jan-2018 14-Jan-2018 11:00 AM 16-Jan-2018 E Rejected Closed
L12 & MH-3-L12
Installation of Sanitary Sewer uPVC Pipes From main line to Manhole
Approved w/
404.1 KHEP-ME-404-01 (Short piece) Ø 200mm - Class 4 Zone 1B Line 12 MH-1-L12 MH-2- Line 12 Zone 1B Division 33 17-Jan-2018 18-Jan-2018 11:00 AM 21-Jan-2018 B comments
Closed
L12 & MH-3-L12
Inspection for Leak test for Sanitary Sewer Manholes At Zone 1B Line
405 KHEP-ME-405
2 MH-9-L02 ,MH-8-L02 MH-1-L08
Line 2 Zone 1B Division 33 28-Jan-2018 29-Jan-2018 10:15 AM 30-Jan-2018 A Approved Closed
Intallation of Vertical Pipe Sleeves for the Penetration of Drainage &
water supply Piping air vent & mechanical Openings at first floor slab Division 22 &
406 KHEP-ME-406
& for vent at stair landing between ground floor & first floor Cluster
Cluster 30 B2 Zone 2B
23
13-Jan-2018 14-Jan-2018 10:00 AM 15-Jan-2018 A Approved Closed
30 B2 Zone 2B
Intallation of Vertical Pipe Sleeves for the Penetration of Drain
Division 22 &
407 KHEP-ME-407 condensate drain vent pipes & block outs for mechanical Opening on Cluster 27 B2 Zone 2B
23
13-Jan-2018 14-Jan-2018 10:30 AM 15-Jan-2018 A Approved Closed
the roof slab Cluster 27 B2 Zone 2B
Intallation of Vertical Pipe Sleeves for the Penetration of Drain
Cluster 16 Division 22 &
408 KHEP-ME-408 condensate drain vent pipes & block outs for mechanical Opening on
BC4
Zone 1B
23
14-Jan-2018 15-Jan-2018 10:00 AM 16-Jan-2018 A Approved Closed
the roof slab Cluster 16 BC4 Zone 1B
Installation of Underground Soil & waste Drainage Piping as per Cluster 17 B2
409 KHEP-ME-409
Highlighted Zone 1B Cluster 17 B2 Left Villa Left Villa
Zone 1B Division 22 14-Jan-2018 15-Jan-2018 10:00 AM 16-Jan-2018 A Approved Closed

Installation of Underground Soil & waste Drainage Piping as per Cluster 05 B2


410 KHEP-ME-410
Highlighted Zone 1B Cluster 05 B2 Left Villa Left Villa
Zone 1B Division 22 14-Jan-2018 15-Jan-2018 10:30 AM 20-Jan-2018 A Approved Closed

Installation of Underground Soil & waste Drainage Piping as per


411 KHEP-ME-411
Highlighted Zone 1B Cluster 05 B2 Right Villa
Right Villa Zone 1B Division 22 14-Jan-2018 15-Jan-2018 10:30 AM 20-Jan-2018 A Approved Closed

Installation of Underground Soil & waste Drainage Piping as per Cluster 07 B2


412 KHEP-ME-412
Highlighted Zone 1B Cluster 07 B2 left Villa Left Villa
Zone 1B Division 22 14-Jan-2018 15-Jan-2018 11:00 AM 20-Jan-2018 A Approved Closed

Installation of Vertical Pipe Sleeves for the Penetration of Drainage


Cluster 21
413 KHEP-ME-413 roof drains vent pipe & Block outs for mechanical Opening on the
BC4
Zone 1B Division 22 14-Jan-2018 15-Jan-2018 10:30 AM 16-Jan-2018 A Approved Closed
first floor Zone 1B Cluster 21 BC4
Inspection for Leak test for Sanitary Sewer Manholes at Zone 1B Line
414 KHEP-ME-414
5 MH-1-L05 MH-2-L05
Line 5 Zone 1B Division 33 14-Jan-2018 15-Jan-2018 10:15 AM 16-Jan-2018 E Rejected Closed

Inspection for Leak test for Sanitary Sewer Manholes at Zone 1B Line
414.1 KHEP-ME-414-01
5 MH-1-L05 MH-2-L05
Line 5 Zone 1B Division 33 23-Jan-2018 24-Jan-2018 10:15 AM 25-Jan-2018 A Approved Closed

Inspection of Gravity Leak Test of underground drainage system


415 KHEP-ME-415 uPVC installed inside the Building as highlighted Zone 1B Cluster 13 Cluster 13 B2 Zone 1B Division 22 15-Jan-2018 16-Jan-2018 9:00 AM 20-Jan-2018 A Approved Closed
B2
Installation of Underground Drainage system Soil waste & vent below
Cluster 7
416 KHEP-ME-416 ground floor structural slab as highlighted Zone 1B Cluster 7 Right
Right Villa
Zone 1B Division 22 15-Jan-2018 16-Jan-2018 9:40 AM 20-Jan-2018 A Approved Closed
Villa 2 B2
Installation of Underground Drainage system Soil waste & vent below
Cluster 17
417 KHEP-ME-417 ground floor structural slab as highlighted Zone 1B Cluster 17 Right
Right Villa 2
Zone 1B Division 22 15-Jan-2018 16-Jan-2018 9:50 AM 20-Jan-2018 A Approved Closed
Villa 2 B2

Installation of underground soil & waste Drainage Piping as per Cluster 17 B2


418 KHEP-ME-418 Zone 1B Division 22 15-Jan-2018 16-Jan-2018 10:00 AM CANCELLED
Highlighted Zone 1B Cluster 17 B2 Right Villa Right Villa

Installation of underground soil & waste Drainage Pipeing as per Cluster 7 B2


419 KHEP-ME-419
Highlighted Zone 1B Cluster 7 B2 Right Villa Right Villa
Zone 1B Division 22 15-Jan-2018 16-Jan-2018 10:30 AM 20-Jan-2018 A Approved Closed

Installation of Vertical Pipe Sleeves for the Penetration of roof drains


Division 22 &
420 KHEP-ME-420 condensate drain vent pipe & Block outs for mechanical Opening on Cluster 71 B2 Zone 4B
23
15-Jan-2018 16-Jan-2018 10:00 AM 20-Jan-2018 A Approved Closed
theroof slab Zone 4B Cluster 71 B2
Installation of Back Drops for sanitary sewer uPVC Pipes 160mm
421 KHEP-ME-421
Class 4 Zone 2B Line 30 MH-1A-L30
Line 30 Zone 2B Division 33 15-Jan-2018 16-Jan-2018 11:00 AM 20-Jan-2018 A Approved Closed

Installation of sanitary sewer uPVC Pipes from main line to manhole


422 KHEP-ME-422 short pieces 200mm Class 4 Zone 2B Line 9,10,11 MH-3-L09 MH-2- Line 9,10,11 Zone 2B Division 33 15-Jan-2018 16-Jan-2018 11:00 AM 20-Jan-2018 A Approved Closed
L09 MH-1-L09 MH-1-L10 MH-1-L11
Inspection for Leak test for sanitary sewer short pices at Zone 2B
423 KHEP-ME-423
Line 12 MH-1-L12 MH-2-L12 MH-3-L12
Line 12 Zone 2B Division 33 15-Jan-2018 16-Jan-2018 10:15 AM 20-Jan-2018 E Rejected Closed

Inspection for Leak test for sanitary sewer short pices at Zone 2B
423.1 KHEP-ME-423-01
Line 12 MH-1-L12 MH-2-L12 MH-3-L12
Line 12 Zone 2B Division 33 24-Jan-2018 25-Jan-2018 10:15 AM 27-Jan-2018 A Approved Closed

Inspection for Leak test for sanitary sewer short pices at Zone 2B
424 KHEP-ME-424
Line 9 MH-2-L09 MH-3-L09
Line 9 Zone 2B Division 33 16-Jan-2018 17-Jan-2018 10:15 AM 20-Jan-2018 A Approved Closed

Installation Fire Fighting System Piping only as per attached Highlited Approved w/
425 KHEP-ME-425
Drawing Cluster 69 B2 Zone 4B
Cluster 69 B2 Zone 4B Division 21 16-Jan-2018 17-Jan-2018 10:00 AM 20-Jan-2018 B comments
Closed

Hydrostatic Pressure testing of fire fighting system Piping Only as per Approved w/
426 KHEP-ME-426
attached highlited drawings Cluster 69 Zone 4B
Cluster 69 B2 Zone 4B Division 21 16-Jan-2018 17-Jan-2018 10:00 AM 20-Jan-2018 B comments
Closed

Installation of DCW, DHW, RHW Piping from ground floor to roof as


Cluster 69 B2
427 KHEP-ME-427 per highlighted Excluding Valves & Water Hammer Arrester Cluster
Right Villa
Zone 4B Division 21 16-Jan-2018 17-Jan-2018 10:30 AM 21-Jan-2018 E Rejected Closed
69 B2 Right Villa Zone 4B

Installation of water closet concealed cistern wall hung type typical Cluster 69 B2
428 KHEP-ME-428
at ground floor & first floor Cluster 69 B2 Right Vill Zone 4B Right Villa
Zone 4B Division 22 17-Jan-2018 18-Jan-2018 10:00 AM 21-Jan-2018 E Rejected Closed

Installation of ceiling concealed fan coil units & connection of


Cluster 69 B2
429 KHEP-ME-429 insulated condensate drain typical at ground floor & first floor Cluster
Right Villa
Zone 4B Division 23 17-Jan-2018 18-Jan-2018 10:30 AM 21-Jan-2018 E Rejected Closed
69 B2 Right Vill Zone 4B
Installation of Vertical Pipe Sleeves for the Penetration of roof drains
430 KHEP-ME-430 condensate drain vent pipe & Block outs for mechanical Opening on Cluster 52 B2 Zone 3B Division 22,23 17-Jan-2018 18-Jan-2018 10:00 AM 20-Jan-2018 A Approved Closed
the roof slab Zone 3B Cluster 52 B2
Installation of Vertical Pipe Sleeves for the Penetration of Vent Pipes
Cluster 50
431 KHEP-ME-431 at the Stair Landing Area Between Ground & First Floor Zone 3B
BC4
Zone 3B Division 22 17-Jan-2018 18-Jan-2018 10:30 AM 20-Jan-2018 A Approved Closed
Cluster 50 BC4
Installation of underground soil & waste drainage piping as per
432 KHEP-ME-432
highlighted Zone 1B Cluster 10 B2
Cluster 10 B2 Zone 1B Division 22 17-Jan-2018 18-Jan-2018 9:20 AM 20-Jan-2018 A Approved Closed

Installation of underground soil & waste drainage piping as per Cluster 11 B2 Approved w/
433 KHEP-ME-433
highlighted Zone 1B Cluster 11 B2 left & right left & right
Zone 1B Division 22 17-Jan-2018 18-Jan-2018 9:30 AM 20-Jan-2018 B comments
Closed

Inspection of gravity leak test of underground drainage system uPVC Approved w/


434 KHEP-ME-434
installed inside the Building as highlighted Zone 1B Cluster 5 B2
Cluster 5 B2 Zone 1B Division 22 17-Jan-2018 18-Jan-2018 9:15 AM 21-Jan-2018 B comments
Closed

Inspection for Leak test for Storm Drainage GRP Pipes And
435 KHEP-ME-435 Manholes Ø 400mm Zone 1B Line 10 Main Line:From MH-I31- Line 10 Zone 1B Division 33 18-Jan-2018 20-Jan-2018 11:00 AM 21-Jan-2018 A Approved Closed
L10~MH-32-L10
Installation of storm drainage GRP pipes & short piece embedded
436 KHEP-ME-436 pice 500mm Zone 3B Line 20 Mh-68-L20 to MH-69-L20 MH-69-L20 Line 20 Zone 3B Division 33 18-Jan-2018 20-Jan-2018 11:30 AM 21-Jan-2018 A Approved Closed
to MH-70-L20
Installation of sanitary sewer upvc pipes & short pices 200mm Class
437 KHEP-ME-437
4 Zone 1B Line 2 MH-6-L02 MH-5-L02
Line 2 Zone 1B Division 33 18-Jan-2018 20-Jan-2018 11:00 AM 21-Jan-2018 A Approved Closed

Installation of grating channel at ground floor parking area for


438 KHEP-ME-438
mockup only Zone 4A Cluster 69 B2
Cluster 69 B2 Zone 4A Division 22 18-Jan-2018 20-Jan-2018 9:30 AM 21-Jan-2018 A Approved Closed

Inspection of gravity leak test for underground drainage system


439 KHEP-ME-439
UPVC installed inside the building as highlighted Zone 1B Cluster 17
Cluster 17 Zone 1B Division 22 20-Jan-2018 21-Jan-2018 9:30 AM 22-Jan-2018 A Approved Closed

Installation of underground drainage system soil & waste UPVC pipe


Cluster 8 B2
440 KHEP-ME-440 line below ground floor as per highlighted Zone 1B Cluster 8 B2 Villa1
Villa1 & 2
Zone 1B Division 22 20-Jan-2018 21-Jan-2018 8:30 AM 23-Jan-2018 A Approved Closed
&2

Installation of underground drainage system soil & waste UPVC pipe Cluster 11 B2
441 KHEP-ME-441
line below ground floor as per highlighted Zone 1B Cluster 11 B2 V2 V2
Zone 1B Division 22 20-Jan-2018 21-Jan-2018 8:30 AM 23-Jan-2018 A Approved Closed

Inspection of gravity leak test for underground drainage system


Cluster 7 B2
442 KHEP-ME-442 UPVC installed inside the building as highlighted Zone 1B Cluster 7
Villa1 & 2
Zone 1B Division 22 20-Jan-2018 21-Jan-2018 9:30 AM 23-Jan-2018 A Approved Closed
B2 Villa1 & 2
Inspection for leak test for sanitary sewer manholes at Zone 1B Line
443 KHEP-ME-443
1 MH-8-L01 MH-7-L01 & MH-6-L01
Line 1 Zone 1B Division 33 20-Jan-2018 21-Jan-2018 10:15 AM 22-Jan-2018 A Approved Closed

Inspection for leak test for sanitary sewer manholes at Zone 1B Line Approved w/
444 KHEP-ME-444
2 MH-5-A-L02 MH-4-L02 & MH-3-L02
Line 2 Zone 1B Division 33 20-Jan-2018 21-Jan-2018 10:15 AM 22-Jan-2018 B comments
Closed

Inspection for leak test for sanitary sewer short piece at Zone 2B
445 KHEP-ME-445
Line 9 MH-1-L09 MH-2-L09
Line 9 Zone 2B Division 33 20-Jan-2018 21-Jan-2018 10:15 AM 22-Jan-2018 A Approved Closed

Inspection of gravity leak test underground drainage system uPVC


446 KHEP-ME-446
installed inside the building as highlighted Zone 1B Cluster 10 B2
Cluster 10 B2 Zone 1B Division 22 21-Jan-2018 22-Jan-2018 9:30 AM 23-Jan-2018 A Approved Closed

Installation of gully traps for balcony drains at first floor as Cluster 18


447 KHEP-ME-447
highlighted Zone1B Cluster 18 BC4 BC4
Zone 1B Division 22 21-Jan-2018 22-Jan-2018 10:30 AM 23-Jan-2018 A Approved Closed

Installation of vertical pipe sleeves for the penetration of drainage &


water supply piping air vent & mechanical openings at first floor slab Cluster 18 Division 22,
448 KHEP-ME-448
& stair landing between ground floor & first floor Zone 1B Cluster 18 BC4
Zone 1B
23
21-Jan-2018 22-Jan-2018 10:00 AM 23-Jan-2018 A Approved Closed
BC4

Installtion of sanitary sewer uPVC from main line to manhole short Approved w/
449 KHEP-ME-449
piece & backdrop 200mm & 160mm Class 4 Line 2 Zone 2B & 3B
Line 2 Zone 2B & 3B Division 33 21-Jan-2018 22-Jan-2018 11:00 AM 23-Jan-2018 B comments
Closed

Gravity leak test for the installation of balcony drainage risers


450 KHEP-ME-450 including gully traps uPVC installed inside the building as highlighted Cluster 14 B2 Zone 1B Division 22 22-Jan-2018 23-Jan-2018 10:00 AM 25-Jan-2018 A Approved Closed
Zone 1B Cluster 14 B2

Inspection for the installation of balcony drainage risers uPVC


451 KHEP-ME-451
installed inside the building as highlighted Zone 1B Cluster 19 B2
Cluster 19 B2 Zone 1B Division 22 22-Jan-2018 23-Jan-2018 10:30 AM 23-Jan-2018 E Rejected Closed

Inspection for the installation of balcony drainage risers uPVC


Cluster 19 B2
451.1 KHEP-ME-451-01 installed inside the building as highlighted Zone 1B Cluster 19 B2 V1
V1 & V2
Zone 1B Division 22 31-Jan-2018 1-Feb-2018 9:45 AM 1-Feb-2018 E Rejected Closed
& V2
Inspection for the installation of balcony drainage risers uPVC
Cluster 19 B2
451.2 KHEP-ME-451-02 installed inside the building as highlighted Zone 1B Cluster 19 B2 V1
V1 & V2
Zone 1B Division 22 12-Feb-2018 13-Feb-2018 10:10 AM 13-Feb-2018 A Approved Closed
& V2
Inspection for the installation of balcony drainage risers uPVC
452 KHEP-ME-452
installed inside the building as highlighted Zone 1B Cluster 20 B2
Cluster 20 B2 Zone 1B Division 22 22-Jan-2018 23-Jan-2018 11:00 AM 23-Jan-2018 A Approved Closed

Inspection for leak test for storm drainage GRP pipes & manholes
453 KHEP-ME-453
500mm MH-51-L15 MH-52-L15 Zone 1B Line 15
Line 15 Zone 1B Division 33 23-Jan-2018 24-Jan-2018 11:00 AM 27-Jan-2018 A Approved Closed

Installation of Sanitary Sewer uPVC from main line to Manhole Short


454 KHEP-ME-454 Piece 200mm - Class 4 Zone 1B Line 1 MH-10-L01 MH-11-L01 MH- Line 1 Zone 1B Division 33 23-Jan-2018 24-Jan-2018 11:00 AM 25-Jan-2018 A Approved Closed
12-L01
Installation of storm drainage GRP pipes from main line to manhole
455 KHEP-ME-455
short piece 400mm Zone 1B Line 15 MH-54-L15
Line 15 Zone 1B Division 33 23-Jan-2018 24-Jan-2018 11:30 AM 25-Jan-2018 A Approved Closed

Installation of horizontal pipe sleeves at the ground floor structural


beam & vertical pipe sleeves for the penetration of drainage water Division 23 &
456 KHEP-ME-456
lines & air vent piping & mechanical openings at first floor stuctural
Cluster 44 A6 Zone 2A
23
23-Jan-2018 24-Jan-2018 10:00 AM 25-Jan-2018 A Approved Closed
slab Zone 2A Cluster 44 A6
Installation of horizontal pipe sleeves at the ground floor structural
beam & vertical pipe sleeves for the penetration of drainage water Division 23 &
457 KHEP-ME-457
lines & air vent piping & mechanical openings at first floor stuctural
Cluster 66 A6 Zone 4A
23
23-Jan-2018 24-Jan-2018 10:30 AM 25-Jan-2018 A Approved Closed
slab Zone 4A Cluster 66 A6

Inspection of gravity leak test underground drainage system uPVC


458 KHEP-ME-458
installed inside the building as highlighted Zone 1B Cluster 8 B2
Cluster 8 B2 Zone 1B Division 22 23-Jan-2018 24-Jan-2018 10:00 AM 25-Jan-2018 A Approved Closed

Installation of kitchen sink DCW & DHW water supply & dishwasher
Cluster 15 B2
459 KHEP-ME-459 DCW water supply PPR imbedded on wall as highlighted Zone 1B
Right Villa
Zone 1B Division 22 23-Jan-2018 24-Jan-2018 10:30 AM 25-Jan-2018 A Approved Closed
Cluster 15 B2 Right Villa
Gravity leak test for the installation of balcony drainage risers
460 KHEP-ME-460 including gully traps uPVC installed inside the building as highlighted Cluster 13 B2 Zone 1B Division 22 23-Jan-2018 24-Jan-2018 10:00 AM 27-Jan-2018 A Approved Closed
Zone 1B Cluster 13 B2

Installation of kitchen sink dishwasher drainage pipe & condensate


Cluster 15 B2
461 KHEP-ME-461 drain riser UPVC inbedded on wall going to floor drain gully trap as
Right Villa
Zone 1B Division 22 23-Jan-2018 24-Jan-2018 10:30 AM 25-Jan-2018 E Rejected Closed
highlighted Zone 1B Cluster 15 B2 Right Villa

Installation of kitchen sink dishwasher drainage pipe & condensate


Cluster 15 B2
461.1 KHEP-ME-461-01 drain riser UPVC inbedded on wall going to floor drain gully trap as
Right Villa
Zone 1B Division 22 28-Jan-2018 29-Jan-2018 10:00 AM 30-Jan-2018 A Approved Closed
highlighted Zone 1B Cluster 15 B2 Right Villa

Inspection of gravity leak test underground drainage system uPVC Cluster 11 B2


Approved w/
462 KHEP-ME-462 installed inside the building as highlighted Cluster 11 B2 Villa 1 & Villa 1 & Villa Zone 1B Division 22 24-Jan-2018 25-Jan-2018 10:00 AM 27-Jan-2018 B comments
Closed
Villa 2 Zone 1B 2
Installation of underground drainage system soil & waste uPVC pipe Cluster 12 B2
Approved w/
463 KHEP-ME-463 line below ground floor structural slab Cluster 12 B2 Villa 1 & Villa 2 Villa 1 & Villa Zone 1B Division 22 24-Jan-2018 25-Jan-2018 11:00 AM 27-Jan-2018 B comments
Closed
Zone 1B 2
Installation of underground drainage system soil & waste uPVC pipe Cluster 20 B2
464 KHEP-ME-464 line below ground floor structural slab Cluster 20 B2 Villa 1 & Villa 2 Villa 1 & Villa Zone 1B Division 22 24-Jan-2018 25-Jan-2018 11:00 AM 25-Jan-2018 A Approved Closed
Zone 1B 2
Installation of kitchen sink & dishwasher drainage pipe & condensate
Cluster 15 B2
465 KHEP-ME-465 drain riser UPVC imbedded on wall going to floor drain gully trap as
Left Villa
Zone 1B Division 22 24-Jan-2018 25-Jan-2018 10:00 AM 25-Jan-2018 E Rejected Closed
highlighted Zone 1B Cluster 15 B2 Left Villa
Installation of kitchen sink & dishwasher drainage pipe & condensate
Cluster 15 B2
465.1 KHEP-ME-465-01 drain riser UPVC imbedded on wall going to floor drain gully trap as
Left Villa
Zone 1B Division 22 28-Jan-2018 29-Jan-2018 10:30 AM 30-Jan-2018 A Approved Closed
highlighted Zone 1B Cluster 15 B2 Left Villa
Installation of kitchen sink DCW & DHW water supply & dishwasher
Cluster 15 B2
466 KHEP-ME-466 DCW water supply PPR imbedded on wall as highlighted Zone 1B
Left Villa
Zone 1B Division 22 24-Jan-2018 25-Jan-2018 10:00 AM 27-Jan-2018 E Rejected Closed
Cluster 15 B2 Left Villa
Installation of kitchen sink DCW & DHW water supply & dishwasher
Cluster 15 B2 Approved w/
466.1 KHEP-ME-466-01 DCW water supply PPR imbedded on wall as highlighted Zone 1B
Left Villa
Zone 1B Division 22 28-Jan-2018 29-Jan-2018 10:30 AM 30-Jan-2018 B comments
Closed
Cluster 15 B2 Left Villa
Installation of gully traps for balcony drains at first floor as
467 KHEP-ME-467
highlighted Cluster 66 A6 Zone 4A
Cluster 66 A6 Zone 4A Division 22 24-Jan-2018 25-Jan-2018 10:30 AM 25-Jan-2018 A Approved Closed

Installation of gully traps for balcony drains at first floor as


468 KHEP-ME-468
highlighted Cluster 44 A6 Zone 2A
Cluster 44 A6 Zone 2A Division 22 24-Jan-2018 25-Jan-2018 11:00 AM 25-Jan-2018 A Approved Closed

Installation of sanitary sewer upvc pipes & short pices 200mm Class
469 KHEP-ME-469
4 Zone 1B Line 2 MH-7-L02 MH-6-L02
Line 2 Zone 1B Division 33 24-Jan-2018 25-Jan-2018 11:00 AM 27-Jan-2018 A Approved Closed

Installation of storm drainage GRP pipes from main line to manhole


470 KHEP-ME-470 short piece 500mm & 600mm Zone 1B Line 15 MH-54-L15 MH-46- Line 15 Zone 1B Division 33 24-Jan-2018 25-Jan-2018 11:30 AM 27-Jan-2018 A Approved Closed
L15
Installation of sanitary sewer upvc pipes from main line to manhole
471 KHEP-ME-471 short piece & back drop 160mm Class 4 Zone 2B Line 9,10,11 MH-1- Line 9,10,11 Zone 2B Division 33 25-Jan-2018 27-Jan-2018 11:00 AM 28-Jan-2018 A Approved Closed
A-L10 MH-1-A-L09 MH-1-A-L11

Installation of sanitary sewer uPVC pipes & short piece 200mm Class
472 KHEP-ME-472
4 Zone 1B Line 2 MH-2-L02 MH-2-A-L02 MH-2-A-L02 MH-1-L02
Line 2 Zone 1B Division 33 25-Jan-2018 27-Jan-2018 11:00 AM 28-Jan-2018 A Approved Closed

Inspection for leak test for storm drainage GRP pipes & manholes
473 KHEP-ME-473
400mm MH-I53-L16 MH-54-L15 Line 16 Zone 1B
Line 16 Zone 1B Division 33 25-Jan-2018 27-Jan-2018 11:00 AM 27-Jan-2018 E Rejected Closed

Inspection for leak test for storm drainage GRP pipes & manholes
473.1 KHEP-ME-473-01
400mm MH-I53-L16 MH-54-L15 Line 16 Zone 1B
Line 16 Zone 1B Division 33 28-Jan-2018 29-Jan-2018 11:00 AM 30-Jan-2018 A Approved Closed

Inspection for leak test for sanitary sewer manholes at Zone 1B Line
474 KHEP-ME-474
3,32 MH-1-A-L03 MH-1-L32
Line 3,32 Zone 1B Division 33 25-Jan-2018 27-Jan-2018 10:15 AM 28-Jan-2018 E Rejected Closed

Inspection for leak test for sanitary sewer manholes at Zone 1B Line
474.1 KHEP-ME-474-01
3,32 MH-1-A-L03 MH-1-L32
Line 3,32 Zone 1B Division 33 29-Jan-2018 30-Jan-2018 10:15 AM 31-Jan-2018 A Approved Closed

Inspection for the installation of floor drains & trench drain including
475 KHEP-ME-475 branch pipings imbedded on slab on grade ar ground floor as Cluster 14 B2 Zone 1B Division 22 25-Jan-2018 27-Jan-2018 10:00 AM 27-Jan-2018 E Rejected Closed
highlighted Zone 1B Cluster 14 B2
Inspection for the installation of floor drains & trench drain including
475.1 KHEP-ME-475-01 branch pipings imbedded on slab on grade at ground floor as Cluster 14 B2 Zone 1B Division 22 28-Jan-2018 29-Jan-2018 10:00 AM 30-Jan-2018 A Approved Closed
highlighted Zone 1B Cluster 14 B2
Inspection for the installation of balcony drainage risers uPVC for
476 KHEP-ME-476 first floor slab doffit to ground floor installed inside building as Cluster 4 A6 Zone 1A Division 22 25-Jan-2018 27-Jan-2018 10:30 AM 28-Jan-2018 E Rejected Closed
highlighted Zone 1A Cluster 4 A6
Inspection for the installation of balcony drainage risers uPVC for
Approved w/
476.1 KHEP-ME-476-01 first floor slab to ground floor installed inside the building as Cluster 4 A6 Zone 1B Division 22 29-Jan-2018 30-Jan-2018 9:00 AM 31-Jan-2018 B comments
Closed
highlighted Zone 1A Cluster 4 A6

Inspection of installation of underground soil & weste drainage piping


477 KHEP-ME-477
at ground floor as per highlighted Zone 2B Cluster 20 B2
Cluster 20 B2 Zone 2B Division 22 25-Jan-2018 27-Jan-2018 11:00 AM 27-Jan-2018 A Approved Closed

Inspection of gravity leak for the installation of underground soil &


478 KHEP-ME-478 waste drainage ppiping at ground floor as per highlighted Zone 1B Cluster 12 B2 Zone 1B Division 22 25-Jan-2018 27-Jan-2018 10:30 AM 27-Jan-2018 E Rejected Closed
Cluster 12 B2
Inspection of gravity leak for the installation of underground soil &
478.1 KHEP-ME-478-01 waste drainage ppiping at ground floor as per highlighted Zone 1B Cluster 12 B2 Zone 1B Division 22 29-Jan-2018 30-Jan-2018 9:30 AM 31-Jan-2018 E Rejected Closed
Cluster 12 B2
Inspection of gravity leak test for underground drainage system
Cluster 12 B2
478.2 KHEP-ME-478-02 uPVC installed inside the building as highlighted Cluster 12 B2 V1 &
V1 & V2
Zone 1B Division 22 1-Feb-2018 3-Feb-2018 10:00 AM 1-Feb-2018 A Approved Closed
V2 Zone 1B
Inspection for the leak test of balcony drainage risers including gully
Approved w/
479 KHEP-ME-479 traps uPVC installed inside the building as highlighted Zone 1B Cluster 11 B2 Zone 1B Division 22 27-Jan-2018 28-Jan-2018 9:00 AM 30-Jan-2018 B comments
Closed
Cluster 11 B2
Inspection for the leak test of balcony drainage risers including gully
Approved w/
480 KHEP-ME-480 traps uPVC installed inside the building as highlighted Zone 1B Cluster 12 B2 Zone 1B Division 22 27-Jan-2018 28-Jan-2018 9:10 AM 30-Jan-2018 B comments
Closed
Cluster 12 B2
Inspection for the leak test of balcony drainage risers including gully
Approved w/
481 KHEP-ME-481 traps uPVC installed inside the building as highlighted Zone 1B Cluster 20 B2 Zone 1B Division 22 27-Jan-2018 28-Jan-2018 9:20 AM 30-Jan-2018 B comments
Closed
Cluster 20 B2
Installation of back drop for sanitary sewer uPVC pipes 160mm Class
482 KHEP-ME-482
4 - MH-6-L02 Zone 1B, Line 02
Line 02 Zone 1B Division 33 27-Jan-2018 28-Jan-2018 11:00 AM 28-Jan-2018 A Approved Closed

Inspection of Sanitary Sewer uPVC Pipes 200mm - Class 4 Zone 1B


483 KHEP-ME-483
Line 2 MH-1-02 MH-4-L01
Line 02 Zone 1B Division 33 28-Jan-2018 29-Jan-2018 11:00 AM 30-Jan-2018 A Approved Closed

Installation of vertical pipe sleeves for the preparation of Drainage &


Division 22 & Approved w/
484 KHEP-ME-484 water Supply Piping , Air Vent & Mechanical Openings at first floor Cluster 63 B2 Zone 3B
23
28-Jan-2018 29-Jan-2018 10:30 AM 30-Jan-2018 B comments
Closed
Slab Cluster 63 B2 Zone 3B
Installation of gully traps for balcony drains at first floor as
485 KHEP-ME-485
highlighted Zone 3B Cluster 63 B2
Cluster 63 B2 Zone 3B Division 22 28-Jan-2018 29-Jan-2018 10:00 AM 30-Jan-2018 A Approved Closed

Installation of gully traps for balcony drains at first floor as Cluster 60


486 KHEP-ME-486
highlighted Zone 3B Cluster 60 BC4 BC4
Zone 3B Division 22 28-Jan-2018 29-Jan-2018 10:30 AM 30-Jan-2018 A Approved Closed

Installation of gully traps for balcony drains at first floor as Cluster 23


487 KHEP-ME-487
highlighted Zone 1B Cluster 23 BC4 BC4
Zone 3B Division 22 28-Jan-2018 29-Jan-2018 11:00 AM 30-Jan-2018 A Approved Closed

Installation of vertical pipe sleeves for the preparation of Drainage &


Cluster 60 Division 22 & Approved w/
488 KHEP-ME-488 water Supply Piping , Air Vent & Mechanical Openings at first floor
BC4
Zone 3B
23
28-Jan-2018 29-Jan-2018 10:00 AM 30-Jan-2018 B comments
Closed
Slab Cluster 60 BC4 Zone 3B
Installation of kitchen sink DCW,DHW & RHW supply imbedded on
wall & above ceiling at ensuite bathroom PPR excluding valves & Cluster 15 B2 Approved w/
489 KHEP-ME-489
water hammer arrester as per highlighted Zone 1B Cluster 15 B2 left left villa
Zone 1B Division 22 28-Jan-2018 29-Jan-2018 10:00 AM 30-Jan-2018 B comments
Closed
villa
Piping & equipment installation for temporary portable water Approved w/
490 KHEP-ME-490
connection to FH 405
Tie-In Tie-In Tie-In 28-Jan-2018 29-Jan-2018 9:30 AM 30-Jan-2018 B comments
Closed

Piping & equipment installation for temporary portable water


490.1 KHEP-ME-490-01 Tie-In Tie-In Tie-In 4-Feb-2018 5-Feb-2018 9:30 AM RECALLED
connection to FH 405 Including Disinfiction Test Certificate
Installation of vertical pipe sleeves for the preparation of roof drain
Division 22 &
491 KHEP-ME-491 condensate drain vent pipes & block outs for mechanical openingon Cluster 6 BC4 Zone 1B
23
29-Jan-2018 30-Jan-2018 10:00 AM 30-Jan-2018 A Approved Closed
the roof slab Cluster 6 BC4 Zone 1B

Installation of vertical pipe sleeves at first floor structural slab for the
penetration of drainage water supply vent & locations of mechanical Cluster 23 Division 22 & Approved w/
492 KHEP-ME-492
openings & pipe sleeves at stair landing between ground floor & first BC4
Zone 1B
23
29-Jan-2018 30-Jan-2018 10:30 AM 30-Jan-2018 B comments
Closed
floor Cluster 23 BC4 Zone 1B

Inspection of sanitary sewer uPVC pipes from main line to manhole


493 KHEP-ME-493 short piece 160mm Class 4 Zone 2B Line 1 MH-13-L01 MH-14-L01 Line 1 Zone 2B Division 33 29-Jan-2018 30-Jan-2018 11:00 AM 30-Jan-2018 A Approved Closed
MH-15-L01
Inspection of gravity leak test underground drainage system uPVC Cluster 20 B2
Approved w/
494 KHEP-ME-494 installed inside the building as highlighted Zone 1B Cluster 20 B2 Villa 1 & Villa Zone 1B Division 33 30-Jan-2018 31-Jan-2018 10:00 AM 31-Jan-2018 B comments
Closed
Villa 1 & Villa 2 2

Inspection for leak test for sanitary sewer for pipe short piece at
495 KHEP-ME-495
Zone 1B Line 2 MH-7-L02 MH MH-6-L02 MH-6-L02 MH-5-L02
Line 2 Zone 1B Division 33 30-Jan-2018 31-Jan-2018 10:15 AM 31-Jan-2018 E Rejected Closed

Inspection for leak test for sanitary sewer for pipe short piece at
495.1 KHEP-ME-495-01
Zone 1B Line 2 MH-7-L02 MH MH-6-L02 MH-6-L02 MH-5-L02
Line 2 Zone 1B Division 33 1-Feb-2018 3-Feb-2018 10:15 AM 1-Feb-2018 A Approved Closed

Inspection for leak test for sanitary sewer manhole at Zone 1B Line 2
496 KHEP-ME-496
MH-6-L02 MH-5-L02
Line 2 Zone 1B Division 33 30-Jan-2018 31-Jan-2018 10:15 AM 31-Jan-2018 E Rejected Closed

Inspection for leak test for sanitary sewer manhole at Zone 1B Line 2
496.1 KHEP-ME-496-01
MH-6-L02 MH-5-L02
Line 2 Zone 1B Division 33 1-Feb-2018 3-Feb-2018 10:15 AM 1-Feb-2018 A Approved Closed

Installation of back drop fro sanitary sewer uPVC pipes 160mm Class
497 KHEP-ME-497
4 Zone 1B Line 2 MH-2-L02 MH-2-A-L02 MH-1-L02
Line 2 Zone 1B Division 33 30-Jan-2018 31-Jan-2018 10:00 AM 31-Jan-2018 E Rejected Closed

Installation of back drop fro sanitary sewer uPVC pipes 160mm Class
497.1 KHEP-ME-497-01
4 Zone 1B Line 2 MH-2-L02 MH-2-A-L02 MH-1-L02
Line 2 Zone 1B Division 33 1-Feb-2018 3-Feb-2018 10:00 AM 1-Feb-2018 A Approved Closed

Inspection for leak test for sanitary sewer back drop at Zone 1B Line
498 KHEP-ME-0498
2 MH-1-L02 MH-2-L01 MH-2-A-L02
Line 2 Zone 1B Division 33 30-Jan-2018 31-Jan-2018 10:30 AM 31-Jan-2018 E Rejected Closed

Inspection for leak test for sanitary sewer back drop at Zone 1B Line
498.1 KHEP-ME-0498-01
2 MH-1-L02 MH-2-L01 MH-2-A-L02
Line 2 Zone 1B Division 33 1-Feb-2018 3-Feb-2018 10:30 AM 1-Feb-2018 A Approved Closed

Gravity leak test of back drop sanitary sewer uPVC 200mm Class 4
498.2 KHEP-ME-0498-02
Zone 1B Line 2 at MH-1-L02 MH-1-A-L02 as highlighted
Line 2 Zone 1B Division 33 3-Feb-2018 4-Feb-2018 9:00 AM 5-Feb-2018 E Rejected Closed

Inspection for the installation of floor drains & trench drain including
Approved w/
0499 KHEP-ME-0499 branch pipings imbedded on slab on grade at ground floor as Cluster 13 B2 Zone 1B Division 22 31-Jan-2018 1-Feb-2018 9:20 AM 1-Feb-2018 B comments
Closed
highlighted Zone 1B Cluster 13 B2
Installation of embedded raiser uPVC pipe on the wall & above
ceiling connections FD for drainage system from first bathroom 2 to Cluster 15 B2 Approved w/
0500 KHEP-ME-0500
ground floor flex room soil west vent as highlighted Cluster 15 B2 V1&V2
Zone 1B Division 22 31-Jan-2018 1-Feb-2018 10:00 AM 1-Feb-2018 B comments
Closed
V1&V2 Zone 1B
Inspection of the installation of floor drains including branch pipings
Cluster 15 B2 Approved w/
0501 KHEP-ME-0501 imbedded on slab on grade at ground floor flex room as highlighted
V1&V2
Zone 1B Division 22 31-Jan-2018 1-Feb-2018 9:20 AM 1-Feb-2018 B comments
Closed
Cluster 15 B2 V1&V2 Zone 1B
Inspection of the installation of floor drains including branch pipings
Cluster 15 B2
0502 KHEP-ME-0502 imbedded on slab on grade at ground floor maids room as
V1&V2
Zone 1B Division 22 31-Jan-2018 1-Feb-2018 9:40 AM 1-Feb-2018 E Rejected Closed
highlighted Cluster 15 B2 V1&V2 Zone 1B
Inspection of the installation of floor drains including branch pipings
Cluster 15 B2
0503 KHEP-ME-0503 imbedded on slab on grade at ground floor powder room as
V1&V2
Zone 1B Division 22 31-Jan-2018 1-Feb-2018 9:40 AM 1-Feb-2018 E Rejected Closed
highlighted Cluster 15 B2 V1&V2 Zone 1B
Inspection of the installation of floor drains including branch pipings
Cluster 15 B2
0504 KHEP-ME-0504 imbedded on slab on grade at ground floor loundry as highlighted
V1&V2
Zone 1B Division 22 31-Jan-2018 1-Feb-2018 9:45 AM 1-Feb-2018 A Approved Closed
Cluster 15 B2 V1&V2 Zone 1B
Inspection for leak test for sanitary sewer for pipe short piece at
0505 KHEP-ME-0505
Zone 1B Line 31 MH-1-A-L31 MH-9-L02
Line 31 Zone 1B Division 33 31-Jan-2018 1-Feb-2018 10:15 AM 1-Feb-2018 A Approved Closed

Installation of sanitary sewer uPVC & short piece 200mm Class 4


0506 KHEP-ME-0506
Zone 1B Line 2 MH-3-L02 MH-2-L02
Line 2 Zone 1B Division 33 31-Jan-2018 1-Feb-2018 11:00 AM 1-Feb-2018 A Approved Closed

Installation of sanitary sewer uPVC pipes from main line to manhole


0507 KHEP-ME-0507
short piece 160mm Zone 2B Line 27 MH-1-L27 MH-2-L27
Line 27 Zone 2B Division 33 31-Jan-2018 1-Feb-2018 11:00 AM 1-Feb-2018 A Approved Closed
Inspection for the leak test of balcony drainage raisers uPVC installed Cluster 10 B2 Approved w/
0508 KHEP-ME-0508
inside the building as highlighted Zone 1B Cluster 10 B2 V1 & V2 V1 & V2
Zone 1B Division 22 31-Jan-2018 1-Feb-2018 10:00 AM 1-Feb-2018 B comments
Closed

Inspection for the installation of balcony drainage risers uPVC


Cluster 27 B2 Approved w/
0509 KHEP-ME-0509 installed inside the building as highlighted Zone 1B Cluster 27 B2 V1
V1 & V2
Zone 1B Division 22 31-Jan-2018 1-Feb-2018 9:50 AM 1-Feb-2018 B comments
Closed
& V2
Installation of vertical pipe sleeves for the penetration of roof drain
Division 22 &
0510 KHEP-ME-0510 condensate drain vent pipes & block outs for mechanical opening on Cluster 73 B2 Zone 4B
23
1-Feb-2018 3-Feb-2018 10:00 AM 5-Feb-2018 A Approved Closed
the roof slab Zone 4B Cluster 73 B2
Installation of gully traps for balcony drains at first floor as
0511 KHEP-ME-0511
highlighted Cluster 43 A6 Zone 2A
Cluster 43 A6 Zone 2A Division 22 1-Feb-2018 3-Feb-2018 10:00 AM 5-Feb-2018 A Approved Closed

Inspection for the installation of floor drain & tench drain including
0512 KHEP-ME-0512 branch piping imbedded on slab on grade at ground floor as per Cluster 5 Zone 1B Division 22 3-Feb-2018 4-Feb-2018 10:00 AM 5-Feb-2018 E Rejected Closed
highlighted Cluster 5 Zone 1B
Inspection for the installation of floor drain & tench drain including
0512.1 KHEP-ME-0512-01 branch piping imbedded on slab on grade at ground floor as per Cluster 5 Zone 1B Division 22 5-Feb-2018 6-Feb-2018 10:00 AM 6-Feb-2018 A Approved Closed
highlighted Cluster 5 Zone 1B

Inspection of installation of underground soil & weste drainage uPVC


0513 KHEP-ME-0513
piping as per highlighted Zone 1B Cluster 19 B2
Cluster 19 B2 Zone 1B Division 22 3-Feb-2018 4-Feb-2018 10:10 AM 5-Feb-2018 E Rejected Closed

Inspection of installation of underground soil & weste drainage uPVC


0513.1 KHEP-ME-0513-01
piping as per highlighted Zone 1B Cluster 19 B2
Cluster 19 B2 Zone 1B Division 22 5-Feb-2018 6-Feb-2018 10:00 AM 7-Feb-2018 A Approved Closed

Inspection of gravity test for sanitary sewer uPVC pipes 200mm Class
0514 KHEP-ME-0514 4 & manholes with short piecs at Zone 2B & 3B Line 1 MH-9-L01 MH- Line 1 Zone 2B & 3B Division 33 3-Feb-2018 4-Feb-2018 9:00 AM 5-Feb-2018 E Rejected Closed
15-L01
Inspection of gravity test for sanitary sewer uPVC pipes 200mm Class
0514.1 KHEP-ME-0514-01 4 & manholes with short piecs at Zone 2B & 3B Line 1 MH-9-L01 MH- Line 1 Zone 2B & 3B Division 33 6-Feb-2018 7-Feb-2018 9:00 AM 10-Feb-2018 A Approved Closed
15-L01
Inspection of gravity test for storm pipe & manholes with short piecs
0515 KHEP-ME-0515 at RD01 Line 8 MH-27-L07 MH-21-L08 & Alley04 MH-I25-L09 to MH- Line 8 RD01, RD05 Division 33 3-Feb-2018 4-Feb-2018 9:30 AM 5-Feb-2018 E Rejected Closed
26-L08 & RD05 MH-27-L07 MH-20-L07

Inspection for installation of underground soil & waste drainage Cluster 9 BC4
0516 KHEP-ME-0516
uPVC piping as per highlighted Cluster 9 BC4 V4 Zone 1B V4
Zone 1B Division 33 3-Feb-2018 4-Feb-2018 10:20 AM 5-Feb-2018 E Rejected Closed

Inspection for installation of underground soil & waste drainage Cluster 9 BC4
0516.1 KHEP-ME-0516-01
uPVC piping as per highlighted Cluster 9 BC4 V4 Zone 1B V4
Zone 1B Division 33 6-Feb-2018 7-Feb-2018 10:00 AM 7-Feb-2018 A Approved Closed

Installation of horizonal Pipe Sleeves at the Ground Floor Structural


Beam & Vertical Pipe Sleeves for the Penetration of Drainage Water Division 22,
0517 KHEP-ME-0517
lines & air vent piping & Mechanical Openings at first floor Structural
Cluster 43 A6 Zone 2A
23
3-Feb-2018 4-Feb-2018 10:30 AM 6-Feb-2018 A Approved Closed
Slab Zone 2A Cluster 43 A6
Installation of embedded uPVC pipe on the wall for drainage system
Cluster 02 A6
0518 KHEP-ME-0518 at first floor wash Basin WEST CD Master bedroom as highlighted
Villa 1, Villa 6
Zone 1A Division 22 3-Feb-2018 4-Feb-2018 9:40 AM 5-Feb-2018 E Rejected Closed
section Cluster 2 A6 V1,6 Zone 1A
Installation of embedded uPVC pipe on the wall for drainage system
Cluster 02 A6 Approved w/
0518.1 KHEP-ME-0518-01 at first floor wash Basin WEST CD Master bedroom as highlighted
Villa 1, Villa 6
Zone 1A Division 22 8-Feb-2018 10-Feb-2018 10:40 AM 10-Feb-2018 B comments
Closed
section Cluster 2 A6 V1,6 Zone 1A
Installation of embedded PPR pipe on the wall for water supply
Cluster 02 A6
0519 KHEP-ME-0519 system hot & cold at first floor Master bedroom as highlighted
Villa 1, Villa 6
Zone 1A Division 22 3-Feb-2018 4-Feb-2018 9:50 AM 5-Feb-2018 E Rejected Closed
section Cluster 2 A6 V1,6 Zone 1A
Installation of embedded PPR pipe on the wall for water supply
Cluster 02 A6 Approved w/
0519.1 KHEP-ME-0519-01 system hot & cold at first floor Master bedroom as highlighted
Villa 1, Villa 6
Zone 1A Division 22 8-Feb-2018 10-Feb-2018 10:50 AM 10-Feb-2018 B comments
Closed
section Cluster 2 A6 V1,6 Zone 1A
Installation HDPE pipe for portable water system size 160mm at
0520 KHEP-ME-0520 RD06 from ISO 60 to ISO 61 without fitting & valves as highlighted RD06 Zone 1B Division 22 3-Feb-2018 4-Feb-2018 10:50 AM 5-Feb-2018 A Approved Closed
section Zone 1B
Installation of back drop sanitary sewer uPVC pipes 160mm - Class 4 Approved w/
0521 KHEP-ME-0521
Zone 1B Line 2 at MH-6-L02 RD02 as highlighted
Line 2 Zone 1B Division 22 5-Feb-2018 6-Feb-2018 10:00 AM 10-Feb-2018 B comments
Closed

Installation of vertical pipe sleeves for the penetration of roof drains


Division 22 &
0522 KHEP-ME-0522 condensate drain vent pipe & block outs for mechanical opening on Cluster 4 A6 Zone 1A
23
5-Feb-2018 6-Feb-2018 10:00 AM 7-Feb-2018 A Approved Closed
the roof slab as highlighted Zone 1A Cluster 4 A6

Installation of vertical pipe sleeves for the penetration of roof drains


Division 22 &
0523 KHEP-ME-0523 condensate drain vent pipe & block outs for mechanical opening on Cluster 9 BC4 Zone 1B
23
5-Feb-2018 6-Feb-2018 10:00 AM 7-Feb-2018 A Approved Closed
the roof slab as highlighted Zone 1B Cluster 9 BC4
Installation of vertical pipe sleeves at first floor structural slab for the
Cluster 22
0524 KHEP-ME-0524 penetration of drainage water supply vent & locations of mechanical
BC4
Zone 1B Division 22 5-Feb-2018 6-Feb-2018 10:30 AM 6-Feb-2018 A Approved Closed
openings & pipe sleeves at stair Cluster 22 BC4 Zone 1B

Inspection of installation of gully traps for balcony drain at first floor Cluster 50
0525 KHEP-ME-0525
as per highlighted Zone 3B Cluster 50 BC4 BC4
Zone 3B Division 22 5-Feb-2018 6-Feb-2018 10:00 AM 7-Feb-2018 A Approved Closed

Installation of vertical pipe sleeves at first floor structural slab for the
Cluster 50
0526 KHEP-ME-0526 penetration of drainage water supply vent & locations of mechanical
BC4
Zone 3B Division 22 5-Feb-2018 6-Feb-2018 10:30 AM 7-Feb-2018 A Approved Closed
openings Zone 3B Cluster 50 BC4
Inspection for the installation of floor drains & trench drain at ground Division 23 &
0527 KHEP-ME-0527
floor as highlighted Cluster 10 B2 Zone 1B
Cluster 10 B2 Zone 1B
22
6-Feb-2018 7-Feb-2018 10:00 AM 7-Feb-2018 A Approved Closed

Inspection of gravity test back drop UPVC Pipes Zone 1B Line 2 RD02 Approved w/
0528 KHEP-ME-0528
MH-2-L02 MH-2A-L02 MH-1-L02
Line 2 RD02 Zone 1B Division 33 6-Feb-2018 7-Feb-2018 10:00 AM 10-Feb-2018 B comments
Closed

Inspection of gravity test for sewage manhole MH-2-L02 MH-2A-L02


0529 KHEP-ME-0529
MH-1-L02 Zone 1B Line 1 RD02
Line 1 RD02 Zone 1B Division 33 6-Feb-2018 7-Feb-2018 10:00 AM 10-Feb-2018 A Approved Closed

Inspection of gravity test for sewage manhole MH-7-L02 Zone 1B


0530 KHEP-ME-0530
RD02
Line 1 RD02 Zone 1B Division 33 6-Feb-2018 7-Feb-2018 10:30 AM 10-Feb-2018 E Rejected Closed

Inspection of gravity test for sewage manhole MH-7-L02 Zone 1B


0530.1 KHEP-ME-0530-01
RD02
Line 1 RD02 Zone 1B Division 33 10-Feb-2018 11-Feb-2018 10:00 AM 11-Feb-2018 A Approved Closed

Inspection of gravity test for sewage short piece MH-2-L12 MH-1A-


0531 KHEP-ME-0531
L11 MH-1-L011 Zone 1B Line 1
Line 1 Zone 1B Division 33 6-Feb-2018 7-Feb-2018 9:00 AM 10-Feb-2018 A Approved Closed

Inspection installation of underground soil & waste drainage uPVC Cluster 16


0532 KHEP-ME-0532
piping as per highlighted Zone 1B Cluster 16 BC4 BC4
Zone 1B Division 33 6-Feb-2018 7-Feb-2018 10:10 AM 7-Feb-2018 A Approved Closed

Inspection of gravity test for storm main line manholes with short
0533 KHEP-ME-0533 pipecs at MH-21-L08 to MH-26-L08 MH-I25-L09 MH-26-L08 MH-26A- Line 1 Zone 1B Division 33 6-Feb-2018 7-Feb-2018 9:45 AM 10-Feb-2018 A Approved Closed
L08

Inspection of gravity test for storm main line manholes with short
0534 KHEP-ME-0534
pipecs at MH-26A-L08 to MH-27-L07 main line & short pieces Line 1
Line 1 Zone 1B Division 33 6-Feb-2018 7-Feb-2018 10:15 AM 10-Feb-2018 A Approved Closed

Inspection of gravity test for main line & short pipecs at MH-3-L02
0535 KHEP-ME-0535
MH-2-L02 MH-2A-L02 MH-1-L02 MH-4-L01 Zone 1B Line 1 RD02
Line 1 RD02 Zone 1B Division 33 6-Feb-2018 7-Feb-2018 10:00 AM 10-Feb-2018 A Approved Closed

Installation of ensuite bathroom drainage above ceiling as Cluster 15 B2 Division 23 & Approved w/
0536 KHEP-ME-0536
highlighted Cluster 15 B2 Right Villa Zone 1B Right Villa
Zone 1B
22
7-Feb-2018 8-Feb-2018 10:00 AM 10-Feb-2018 B comments
Closed

Installation of vertical pipe sleeves for the penetration of roof drains


Division 23 &
0537 KHEP-ME-0537 condensate drain vent pipe on the roof slab as highlighted Cluster 33 Cluster 33 Zone 2B
22
7-Feb-2018 8-Feb-2018 10:00 AM 10-Feb-2018 A Approved Closed
B2 Zone 2B
Installation of gully trapes at first floor as highlighted Cluster 24 BC4 Cluster 24 Division 23 &
0538 KHEP-ME-0538
Zone 2B BC4
Zone 2B
22
7-Feb-2018 8-Feb-2018 10:15 AM 10-Feb-2018 A Approved Closed

Inspection of the gravity test of sewage short pieces MH-1-L10 to


0539 KHEP-ME-0539
MH-1A-L10 MH-1-L09
Line 1 NA Division 33 7-Feb-2018 8-Feb-2018 10:00 AM 10-Feb-2018 A Approved Closed

Inspection for underground drainage soil & waste piping installation Cluster 9 BC4 Division 23 &
0540 KHEP-ME-0540
as per highlighted Zone 1B Cluster 9 BC4 Villa 3 Villa 3
Zone 1B
22
7-Feb-2018 8-Feb-2018 10:30 AM 10-Feb-2018 A Approved Closed

Inspection for washbasin & condensate riser & vent riser for soil &
Cluster 15 B2 Division 23 & Approved w/
0541 KHEP-ME-0541 waste at first floor ensuite bathroom as per highlighted Zone 1B
Villa 1&2
Zone 1B
22
7-Feb-2018 8-Feb-2018 10:30 AM 10-Feb-2018 B comments
Closed
Cluster 15 B2 Villa 1&2
Inspection for underground drainage soil & waste piping installation Cluster 16 Division 23 &
0542 KHEP-ME-0542
as per highlighted Zone 1B Cluster 16 BC4 Villa 1 BC4 Villa 1
Zone 1B
22
7-Feb-2018 8-Feb-2018 10:30 AM 10-Feb-2018 A Approved Closed

Inspection for underground drainage soil & waste piping installation Cluster 16 Division 23 &
0543 KHEP-ME-0543
as per highlighted Zone 1B Cluster 16 BC4 Villa 2 BC4 Villa 2
Zone 1B
22
7-Feb-2018 8-Feb-2018 10:30 AM 10-Feb-2018 A Approved Closed

Inspection for underground uPVC soil & waste piping installation as Cluster 68 B2
0544 KHEP-ME-0544
per highlighted Zone 4B Cluster 68 B2 Villa 2 Villa 2
Zone 4B Division 22 8-Feb-2018 10-Feb-2018 10:00 AM 10-Feb-2018 A Approved Closed

Inspection for leak test of underground drainage piping installed Cluster 68 B2


0545 KHEP-ME-0545
inside the building as per highlighted Zone 4B Cluster 68 B2 Villa 2 Villa 2
Zone 4B Division 22 8-Feb-2018 10-Feb-2018 10:30 AM 10-Feb-2018 A Approved Closed

Installation for underground drainage uPVC soil & waste piping


0546 KHEP-ME-0546
installation as per highlighted Zone 2B Cluster 27 B2
Cluster 27 B2 Zone 2B Division 22 8-Feb-2018 10-Feb-2018 10:00 AM 10-Feb-2018 A Approved Closed

Installation leak test of underground drainage uPVC piping installed


0547 KHEP-ME-0547
inside the building as per highlighted Zone 2B Cluster 27 B2
Cluster 27 B2 Zone 2B Division 22 8-Feb-2018 10-Feb-2018 10:30 AM 10-Feb-2018 A Approved Closed

Inspection for leak test of underground drainage uPVC piping Cluster 16


0548 KHEP-ME-0548 installed inside the building as per highlighted Zone 1B Cluster 16 BC4 Villa 3 & Zone 1B Division 22 8-Feb-2018 10-Feb-2018 10:15 AM 10-Feb-2018 A Approved Closed
BC4 Villa 3 & Villa 4 Villa 4

Inspection for underground drainage uPVC soil & waste piping Cluster 9 BC4
0549 KHEP-ME-0549
installation as per highlighted Zone 1B Cluster 9 BC4 Villa 3 Villa 3
Zone 1B Division 22 8-Feb-2018 10-Feb-2018 10:30 AM 10-Feb-2018 A Approved Closed
Inspection for leak test of underground drainage uPVC piping Cluster 9 BC4
0550 KHEP-ME-0550 installed inside the building as per highlighted Zone 1B Cluster 9 BC4 Villa 3 & Villa Zone 1B Division 22 8-Feb-2018 10-Feb-2018 10:15 AM 10-Feb-2018 A Approved Closed
Villa 3 & Villa 4 4
Inspection of gravity test for the installation of floor drains gully traps Cluster 10 B2
0551 KHEP-ME-0551 & branches at ground floor as per highlighted Zone 1B Cluster 10 B2 Villa 1 & Villa Zone 1B Division 22 8-Feb-2018 10-Feb-2018 10:30 AM 10-Feb-2018 A Approved Closed
Villa 1 & Villa 2 2
Inspection installation of floor drains gully traps & branches at Cluster 7 B2
0552 KHEP-ME-0552 ground floor slab on grade as per highlighted Zone 1B Cluster 7 B2 Villa 1 & Villa Zone 1B Division 22 8-Feb-2018 10-Feb-2018 10:30 AM 10-Feb-2018 A Approved Closed
Villa 1 & Villa 2 2
Cluster 64 B2
Inspection for the installation gully traps for balcony drains at first
0553 KHEP-ME-0553
floor as per highlighted Zone 3B Cluster 64 B2 Vilal 1 & Villa 2
Vilal 1 & Villa Zone 3B Division 22 8-Feb-2018 10-Feb-2018 10:30 AM 10-Feb-2018 A Approved Closed
2

Inspection for the installation of vertical pipe sleeves fo rpenetration Cluster 64 B2


0554 KHEP-ME-0554 of drainage & water supply piping & mechanical openingss at first Villa 1 & Villa Zone 3B Division 22 8-Feb-2018 10-Feb-2018 10:30 AM 12-Feb-2018 A Approved Closed
floor slab Zone 3B Cluster 64 B2 Villa 1 & Villa 2 2

Inspection for underground drainage uPVC soil & waste piping Cluster 68 B2
0555 KHEP-ME-0555
installation as per highlighted Zone 4B Cluster 68 B2 Villa 1 Villa 1
Zone 4B Division 22 8-Feb-2018 10-Feb-2018 10:00 AM 10-Feb-2018 A Approved Closed

Installation of ensuite bathroom drainage above ceiling as Cluster 15 B2 Division 22 & Approved w/
0556 KHEP-ME-0556
highlighted Cluster 15 B2 left Villa Zone 1B left Villa
Zone 1B
23
8-Feb-2018 10-Feb-2018 10:20 AM 10-Feb-2018 B comments
Closed

Inspection of leak test of underground drainage uPVC soil & waste


Cluster 68 B2
0557 KHEP-ME-0557 piping installed inside the building as per highlighted Zone 4B
Villa 1
Zone 4B Division 22 10-Feb-2018 11-Feb-2018 10:15 AM 11-Feb-2018 A Approved Closed
Cluster 68 B2 Villa 1
Inspection of installation of underground drainage uPVC soil & waste
Cluster 19 B2
0558 KHEP-ME-0558 piping inside the building as per highlighted Zone 1B Cluster 19 B2
Villa 1, Villa 2
Zone 1B Division 22 10-Feb-2018 11-Feb-2018 10:10 AM 11-Feb-2018 A Approved Closed
Villa 1, Villa 2
Inspection of leak test of underground drainage uPVC soil & waste
Cluster 16
0559 KHEP-ME-0559 piping installed inside the building as per highlighted Zone 1B
BC4 Villa 2
Zone 1B Division 22 10-Feb-2018 11-Feb-2018 10:00 AM 11-Feb-2018 A Approved Closed
Cluster 16 BC4 Villa 2
Inspection of leak test of underground drainage uPVC soil & waste
Cluster 19 B2
0560 KHEP-ME-0560 piping installed inside the building as per highlighted Zone 1B
Villa 1, Villa 2
Zone 1B Division 22 10-Feb-2018 11-Feb-2018 10:10 AM 11-Feb-2018 A Approved Closed
Cluster 19 B2 Villa 1, Villa 2
Inspection for the leak test of floor drains gully traps & branches at Cluster 7 B2
0561 KHEP-ME-0561 ground floor slab on grade as per highlighted Zone 1B Cluster 7 B2 Villa 1 & Villa Zone 1B Division 22 10-Feb-2018 11-Feb-2018 10:30 AM 11-Feb-2018 A Approved Closed
Villa 1 & Villa 2 2
Inspection for the installation of gully trap of balcony drains at first Cluster 25
0562 KHEP-ME-0562
floor as highlighted Zone 2B Cluster 25 BC4 BC4
Zone 2B Division 22 10-Feb-2018 11-Feb-2018 10:30 AM 11-Feb-2018 A Approved Closed

Inspection of the installation of uPVC pipe & short pieces of sewage


0563 KHEP-ME-0563
line MH-5-L01 MH-4-L01 at RD 04 Zone 1B
Road 4 Zone 1B Division 22 10-Feb-2018 11-Feb-2018 10:00 AM 11-Feb-2018 A Approved Closed

Inspection of gravity test for back drop of sewage manhole MH-6-


0564 KHEP-ME-0564
L02 Road 2 Zone 1B
Road 2 Zone 1B Division 33 10-Feb-2018 11-Feb-2018 10:30 AM 11-Feb-2018 A Approved Closed

Inspection of gravity test for sewage manhole MH-1-L10 MH-1A-L10


0565 KHEP-ME-0565
& MH-1-L09 MH-2-L09 MH-3-L09 MH1A-L09 Zone 1B Road 2
Road 2 Zone 1B Division 33 10-Feb-2018 11-Feb-2018 10:00 AM 11-Feb-2018 A Approved Closed

Inspection for the installation of vertical pipe sleeves for penetration


of drainage & water supply piping & mechanical openingss & vent at Cluster 24
0566 KHEP-ME-0566
first floor slab & pipe sleeve at stair landing between ground & first BC4
Zone 2B Division 22 10-Feb-2018 11-Feb-2018 10:15 AM 11-Feb-2018 E Rejected Closed
floor Zone 2B Cluster 24 BC4
Inspection for the installation of vertical pipe sleeves for penetration
of drainage & water supply piping & mechanical openingss & vent at Cluster 24
0566.1 KHEP-ME-0566-01
first floor slab & pipe sleeve at stair landing between ground & first BC4
Zone 2B Division 22 14-Feb-2018 15-Feb-2018 10:20 AM 17-Feb-2018 A Approved Closed
floor Zone 2B Cluster 24 BC4
inspection for the installation of vertical pipe sleeves for penetration
Cluster 21
0567 KHEP-ME-0567 ofof roof drain condensate drain mechanical openings & vent at roof
BC4
Zone 1B Division 22 10-Feb-2018 11-Feb-2018 10:20 AM 11-Feb-2018 A Approved Closed
floor slab Zone 1B Cluster 21 BC4
Inspection of leak test of underground drainage uPVC soil & waste
Cluster 16
0568 KHEP-ME-0568 piping installed inside the Building as per highlighted Zone 1B Cluster
BC4 Villa 1
Zone 1B Division 22 11-Feb-2018 12-Feb-2018 10:00 AM 13-Feb-2018 A Approved Closed
16 BC4 Villa 1
Inspection of the gravity test for storm pipe line manholes & short
0569 KHEP-ME-0569
pieces MH-28-L07 MH-27-L07 MH-20-L07 Line 01
Line 01 Zone 1B Division 33 25-Feb-2018 26-Feb-2018 10:10 AM 27-Feb-2018 E Rejected Closed

Inspection of gravity test of sewage line short pieces MH-2-L27 MH-


0570 KHEP-ME-0570
1-L27 Line 1 Zone 2B
Line 01 Zone 1B Division 33 11-Feb-2018 12-Feb-2018 10:00 AM 13-Feb-2018 A Approved Closed

Inspection of the installation of sewage line short pieces MH-1-L28


0571 KHEP-ME-0571
MH-1A-L28 Line 1 Zone 2B
Line 01 Zone 2B Division 33 11-Feb-2018 12-Feb-2018 10:15 AM 13-Feb-2018 A Approved Closed

Inspection of the gravity test of sewage line short pieces MH-1-L28


0572 KHEP-ME-0572
MH-1A-L28 MH-2-L27 Line 1 Zone 2B
Line 01 Zone 2B Division 33 11-Feb-2018 12-Feb-2018 10:40 AM 13-Feb-2018 A Approved Closed
Inspection for the leak test of floor drains gully traps & branches at Cluster 5 B2
0573 KHEP-ME-0573 ground floor slab on grade as per highlighted Zone 1B Cluster 5 B2 Villa 1 & Villa Zone 1B Division 22 11-Feb-2018 12-Feb-2018 10:00 AM 18-Feb-2018 A Approved Closed
Villa 1 & Villa 2 2
Inspection of the gravity test of sewage line main line & short pieces
0574 KHEP-ME-0574
MH-5-L01 MH-4-L01 Line 1
Line 1 Road 4 Division 33 12-Feb-2018 13-Feb-2018 9:00 AM 14-Feb-2018 A Approved Closed

Inspection of the gravity test of sewage manhole MH-4-L01 Road 4


0575 KHEP-ME-0575
Line 1
Line 1 Road 4 Division 33 12-Feb-2018 13-Feb-2018 9:10 AM 14-Feb-2018 A Approved Closed

Inspection for the installation of balcony drainage risers uPVC


0576 KHEP-ME-0576
including Gully traps installed as highlighted Zone 1B Cluster 7 B2
Cluster 7 B2 Zone 1B Division 22 12-Feb-2018 13-Feb-2018 10:00 AM 14-Feb-2018 A Approved Closed

Inspection for installation of floor drains gully traps & branches as Cluster 01 A6
0577 KHEP-ME-0577
per highlighted Zone 1A Cluster 1 A6 Villa 5, Villa 6 Villa 5, Villa 6
Zone 1A Division 22 12-Feb-2018 13-Feb-2018 10:40 AM 13-Feb-2018 A Approved Closed

Inspection for installation of floor drains gully traps & branches as Cluster 02 A6
0578 KHEP-ME-0578
per highlighted Zone 1A Cluster 2 A6 Villa 1, Villa 2 Villa 1, Villa 2
Zone 1A Division 22 12-Feb-2018 13-Feb-2018 10:50 AM 13-Feb-2018 A Approved Closed

Inspection for installation of gully traps for balcony drain at first floor Cluster 22
0579 KHEP-ME-0579
as per highlighted Zone 1B Cluster 22 BC4 BC4
Zone 1B Division 22 13-Feb-2018 14-Feb-2018 9:50 AM 17-Feb-2018 A Approved Closed

Inspection for installation of DCW, DHW & RHW supply line PPR
piping above ceiling & embedded on wall at first floor for master & Cluster 15 B2
0580 KHEP-ME-0580
bedroom 1 bathroom excluding valve & water hammer arrestore as Villa 2
Zone 1B Division 22 13-Feb-2018 14-Feb-2018 10:30 AM 17-Feb-2018 A Approved Closed
per highlighted Zone 1B Cluster 15 B2 Villa 2

Inspection for installation of DCW, DHW & RHW supply line PPR
piping above ceiling at first floor for ensuite bathroom excluding Cluster 15
0581 KHEP-ME-0581
valve & water hammer arrestore as per highlighted Zone 1B Cluster Villa 2
Zone 1B Division 22 13-Feb-2018 14-Feb-2018 10:10 AM 17-Feb-2018 A Approved Closed
15 Villa 2

Inspection for installation of vertical pipe sleeves for the penetration


0582 KHEP-ME-0582 of roof drain condensate drain vent pipe & blockouts for mechanical Cluster 34 B2 Zone 2B Division 22 13-Feb-2018 14-Feb-2018 10:20 AM 14-Feb-2018 A Approved Closed
openings as per highlighted Zone 2B Cluster 34 B2

Inspection for installation of vertical pipe sleeves at first floor


stuctural slab for the penetration of drainage, water supply, vent &
0583 KHEP-ME-0583 Cluster 24 B2 Zone 2B Division 22 13-Feb-2018 14-Feb-2018 10:20 AM RECALLED
location of mechanical openings & pipe sleeves at stair landing
between ground floor & first floor Zone 2B Cluster 24 B2

Inspection for installation of vertical pipe sleeves at first floor


stuctural slab for the penetration of drainage, water supply, vent & Cluster 25
0584 KHEP-ME-0584
location of mechanical openings & pipe sleeves at stair landing BC4
Zone 2B Division 22 13-Feb-2018 14-Feb-2018 10:30 AM 17-Feb-2018 A Approved Closed
between ground floor & first floor Zone 2B Cluster 25 BC4

Inspection of the leak test of sewage line beck drop uPVC 160mm
0585 KHEP-ME-0585
MH-11-L02 2NOS MH-12-L02 2NOS MH-13-L02 Zone 2B Line 2
Line 2 Zone 2B Division 33 15-Feb-2018 17-Feb-2018 9:00 AM 18-Feb-2018 A Approved Closed

Inspection for the gravity leak test for the installation of balcony
Approved w/
0586 KHEP-ME-0586 drainage risers uPVC including gully trap installed as highlighted Cluster 07 B2 Zone 1B Division 22 14-Feb-2018 15-Feb-2018 9:00 AM 17-Feb-2018 B comments
Closed
Zone 1B Cluster 07 B2

Inspection for installation of vertical pipe sleeves for the penetration


0587 KHEP-ME-0587 of roof drain condensate drain vent pipe & blockouts for mechanical Cluster 72 B2 Zone 4B Division 22 14-Feb-2018 15-Feb-2018 9:20 AM 17-Feb-2018 E Rejected Closed
openings as per highlighted Zone 4B Cluster 72 B2

Inspection for installation of vertical pipe sleeves at ground floor


stuctural beam & vertical pippe sleeves for the penetration of
0588 KHEP-ME-0588
drainage, waterlines & air vent piping & mechanical openings at first
Cluster 65 A6 Zone 4A Division 22 14-Feb-2018 15-Feb-2018 9:10 AM 17-Feb-2018 A Approved Closed
floor stuctural slab Zone 4A Cluster 65 A6

Inspection for installation of gully traps for balcony drain at first floor
0589 KHEP-ME-0589
as per highlighted Zone 4A Cluster 65 A6
Cluster 65 A6 Zone 4A Division 22 14-Feb-2018 15-Feb-2018 9:15 AM 17-Feb-2018 A Approved Closed

Inspection of installation of underground drainage uPVC soil & waste


Cluster 09
0590 KHEP-ME-0590 piping inside the building as per highlighted Zone 1B Cluster 09 BC4
BC4 Villa 2
Zone 1B Division 22 14-Feb-2018 15-Feb-2018 9:20 AM 17-Feb-2018 A Approved Closed
Villa 2

Inspection for installation of balcony drainage risers uPVC including


0591 KHEP-ME-0591
gully traps installed as highlighted Zone 1B Cluster 08 B2
Cluster 08 B2 Zone 1B Division 22 14-Feb-2018 15-Feb-2018 9:30 AM 17-Feb-2018 A Approved Closed

Inspection for the gravity leak test for the installation of balcony
0592 KHEP-ME-0592 drainage risers uPVC including gully trap installed as highlighted Cluster 19 B2 Zone 1B Division 22 14-Feb-2018 15-Feb-2018 9:40 AM 17-Feb-2018 A Approved Closed
Zone 1B Cluster 19 B2
Inspection for the gravity leak test for the installation of balcony
Approved w/
0593 KHEP-ME-0593 drainage risers uPVC including gully trap installed as highlighted Cluster 05 B2 Zone 1B Division 22 14-Feb-2018 15-Feb-2018 9:45 AM 17-Feb-2018 B comments
Closed
Zone 1B Cluster 05 B2
Inspection for installation of DCW, DHW & RHW supply line piping
above ceiling at first floor for ensuite bathroom excluding valve & Cluster 15 B2
0594 KHEP-ME-0594
water hammer arrestore as per highlighted Zone 1B Cluster 15 B2 Villa 1
Zone 1B Division 22 14-Feb-2018 15-Feb-2018 10:00 AM 17-Feb-2018 E Rejected Closed
Villa 1
Inspection for the leak test of floor drains gully traps & branches at
Cluster 02 A6
0595 KHEP-ME-0595 ground floor slab on grade as per highlighted Zone 1B Cluster 02 A6
Villa 3
Zone 1B Division 22 14-Feb-2018 15-Feb-2018 10:00 AM 18-Feb-2018 A Approved Closed
Villa 3
Inspection for the leak test of floor drains gully traps & branches at
Cluster 02 A6
0596 KHEP-ME-0596 ground floor slab on grade as per highlighted Zone 1B Cluster 02 A6
Villa 4
Zone 1B Division 22 14-Feb-2018 15-Feb-2018 10:05 AM 18-Feb-2018 A Approved Closed
Villa 4
Inspection for the leak test of floor drains gully traps & branches at
Cluster 02 A6
0597 KHEP-ME-0597 ground floor slab on grade as per highlighted Zone 1B Cluster 02 A6
Villa 5
Zone 1B Division 22 14-Feb-2018 15-Feb-2018 10:15 AM 18-Feb-2018 A Approved Closed
Villa 5
Inspection for the leak test of floor drains gully traps & branches at
Cluster 02 A6
0598 KHEP-ME-0598 ground floor slab on grade as per highlighted Zone 1B Cluster 02 A6
Villa 6
Zone 1B Division 22 14-Feb-2018 15-Feb-2018 10:25 AM 18-Feb-2018 A Approved Closed
Villa 6
Inspection for the leak test of floor drains gully traps & branches at
Cluster 13 B2
0599 KHEP-ME-0599 ground floor slab on grade as per highlighted Zone 1B Cluster 13 B2
Villa 1
Zone 1B Division 22 14-Feb-2018 15-Feb-2018 10:25 AM 18-Feb-2018 A Approved Closed
Villa 1
Inspection for the leak test of floor drains gully traps & branches at
Cluster 13 B2
0600 KHEP-ME-0600 ground floor slab on grade as per highlighted Zone 1B Cluster 13 B2
Villa 2
Zone 1B Division 22 14-Feb-2018 15-Feb-2018 10:20 AM 18-Feb-2018 A Approved Closed
Villa 2
Inspection for the leak test of floor drains gully traps & branches at
Cluster 14 B2
0601 KHEP-ME-0601 ground floor slab on grade as per highlighted Zone 1B Cluster 14 B2
Villa 2
Zone 1B Division 22 14-Feb-2018 15-Feb-2018 10:20 AM 18-Feb-2018 A Approved Closed
Villa 2
Inspection for the leak test of floor drains gully traps & branches at
Cluster 14 B2
0602 KHEP-ME-0602 ground floor slab on grade as per highlighted Zone 1B Cluster 14 B2
Villa 1
Zone 1B Division 22 14-Feb-2018 15-Feb-2018 10:25 AM 18-Feb-2018 A Approved Closed
Villa 1

Inspection of the gravity test of storm line main line & short pieces
0603 KHEP-ME-0603
MH-50-L15 MH-51-L15 MH-52-L15 MH-54-L15 Zone 1B Road 01
Road 01 Zone 1B Division 33 15-Feb-2018 17-Feb-2018 10:00 AM 18-Feb-2018 A Approved Closed

Inspection of the leak test of storm manholes MH-50-L15 MH-54-L15


0604 KHEP-ME-0604
Zone 1B Road 01
Road 01 Zone 1B Division 33 15-Feb-2018 17-Feb-2018 10:10 AM 18-Feb-2018 A Approved Closed

Inspection of gravity leak test for sewage manholes MH-1-L12 MH-2-


0605 KHEP-ME-0605
L12 MH-3-L12 Zone 2B Line 1
Line 1 Zone 2B Division 33 17-Feb-2018 18-Feb-2018 10:00 AM 19-Feb-2018 A Approved Closed

Inspection of gravity leak test for sewage manholes MH-1A-L11 MH-


0606 KHEP-ME-0606
1-L11 Zone 2B Line 1
Line 01 Zone 2B Division 33 17-Feb-2018 18-Feb-2018 10:10 AM 19-Feb-2018 A Approved Closed

Installation of combined condensate riser & washbasin drainage at


family room & bedroom 1 & master bathroom & soil & waste vent
0607 KHEP-ME-0607
riser for bedroom 1 & master bathroom from FF to roof as per
Cluster 15 B2 Zone 1B Division 22 17-Feb-2018 18-Feb-2018 10:20 AM 19-Feb-2018 E Rejected Closed
highlighted Cluster 15 B2 Zone 1B
Inspection of gravity leak test for underground drainage uPVC soil &
Cluster 09
0608 KHEP-ME-0608 waste piping inside the building as per highlighted Zone 1B Cluster
BC4 Villa 2
Zone 1B Division 22 17-Feb-2018 18-Feb-2018 9:00 AM 19-Feb-2018 A Approved Closed
09 BC4 Villa 2

Inspection for installation of vertical pipe sleeves for the penetration


0609 KHEP-ME-0609 of roof drain condensate drain vent pipe & block outs for mechanical Cluster 44 A6 Zone 2B Division 22 17-Feb-2018 18-Feb-2018 9:20 AM 19-Feb-2018 A Approved Closed
openings as per highlighted Zone 2B Cluster 44 A6

Inspection of the gravity leak test for sewage manholes MH-1-L28


0610 KHEP-ME-0610
Line 01 Zone 2B
Line 01 Zone 2B Division 33 18-Feb-2018 19-Feb-2018 10:10 AM 20-Feb-2018 A Approved Closed

Inspection of the gravity leak test for the installation of balcony


0611 KHEP-ME-0611 drainage risers uPVC including gully traps installed as highlighted Cluster 08 B2 Zone 1B Division 22 18-Feb-2018 19-Feb-2018 11:00 AM 20-Feb-2018 A Approved Closed
Zone 1B Cluster 08 B2
Inspection of the gravity leak test for sewage manholes MH-2-L27
0612 KHEP-ME-0612
Line 01 Zone 2B
Line 01 Zone 2B Division 33 18-Feb-2018 19-Feb-2018 10:20 AM 20-Feb-2018 A Approved Closed

Inspection for the installation of floor drains gully traps & branches
Cluster 11 B2
0613 KHEP-ME-0613 at ground floor slab on grade as per highlighted Zone 1B Cluster 11
Villa 01
Zone 1B Division 22 18-Feb-2018 19-Feb-2018 9:50 AM 19-Feb-2018 A Approved Closed
B2 Villa 01
Inspection for the installation of floor drains gully traps & branches
Cluster 11 B2
0614 KHEP-ME-0614 at ground floor slab on grade as per highlighted Zone 1B Cluster 11
Villa 02
Zone 1B Division 22 18-Feb-2018 19-Feb-2018 9:50 AM 19-Feb-2018 A Approved Closed
B2 Villa 02
Inspection for the leak test of floor drain gully traps & branches at
Cluster 11 B2
0615 KHEP-ME-0615 ground floor slab on grade as per highlighted Zone 1B Cluster 11 B2
Villa 01
Zone 1B Division 22 18-Feb-2018 19-Feb-2018 10:40 AM 20-Feb-2018 A Approved Closed
Villa 01
Inspection for the leak test of floor drain gully traps & branches at
Cluster 11 B2
0616 KHEP-ME-0616 ground floor slab on grade as per highlighted Zone 1B Cluster 11 B2
Villa 02
Zone 1B Division 22 18-Feb-2018 19-Feb-2018 10:40 AM 20-Feb-2018 A Approved Closed
Villa 02
Inspection for the installation of ground floor drains gully traps &
Cluster 01 A6
0617 KHEP-ME-0617 connected waste drainage branch piping as per highlighted Zone 1A
Villa 01
Zone 1A Division 22 18-Feb-2018 19-Feb-2018 10:50 AM 19-Feb-2018 A Approved Closed
Cluster 01 A6 Villa 01

Inspection for the installation of vertical pipe sleeves for the


0618 KHEP-ME-0618 penetration of roof drain condensate drain vent pipe & blockouts for Cluster 30 Zone 2B Division 22 18-Feb-2018 19-Feb-2018 9:30 AM 19-Feb-2018 A Approved Closed
mechanical openings asper highlighted Zone 2B Cluster 30

Inspection for the gravity leak test for the installation of ground floor
Cluster 02 A6
0619 KHEP-ME-0619 drains gully traps & connected waste drainage branch piping as per
Villa 01
Zone 1A Division 22 18-Feb-2018 19-Feb-2018 9:50 AM 20-Feb-2018 A Approved Closed
highlighted Zone 1A Cluster 02 A6 Villa 01

Inspection for the gravity leak test for the installation of ground floor
Cluster 02 A6
0620 KHEP-ME-0620 drains gully traps & connected waste drainage branch piping as per
Villa 02
Zone 1A Division 22 18-Feb-2018 19-Feb-2018 10:50 AM 20-Feb-2018 A Approved Closed
highlighted Zone 1A Cluster 02 A6 Villa 02

Inspection of the gravity leak test for storm line short pieces MH-49-
0621 KHEP-ME-0621
L15 MH-50-L15 Zone 1B Line 15
Line 15 Zone 1B Division 33 19-Feb-2018 20-Feb-2018 10:10 AM 21-Feb-2018 A Approved Closed

Inspection of the gravity leak test for storm line main line & short
0622 KHEP-ME-0622
pieces MH-47-L15 MH-46-L15 Zone 1B Line 15
Line 15 Zone 1B Division 33 19-Feb-2018 20-Feb-2018 10:00 AM 21-Feb-2018 A Approved Closed

Inspection of the gravity leak test for storm manhole MH-49-L15 Line
0623 KHEP-ME-0623
15 Zone 1B
Line 15 Zone 1B Division 33 19-Feb-2018 20-Feb-2018 10:00 AM 21-Feb-2018 A Approved Closed

Inspection of the gravity leak test for storm manhole MH-46-L15 Line
0624 KHEP-ME-0624
15 Zone 1B
Line 15 Zone 1B Division 33 19-Feb-2018 20-Feb-2018 10:30 AM 21-Feb-2018 A Approved Closed

Inspection of installation of underground uPVC soil & waste drainage


Cluster 06
0625 KHEP-ME-0625 piping at ground floor as per highlighted Zone 1B Cluster 06 BC4 Villa
BC4 Villa 01
Zone 1B Division 22 19-Feb-2018 20-Feb-2018 10:40 AM 20-Feb-2018 A Approved Closed
01
Inspection of installation of ground floor drains gully traps &
Cluster 01 A6
0626 KHEP-ME-0626 Connected waste drainage branch piping as per highlighted Zone 1A
Villa 02
Zone 1A Division 22 19-Feb-2018 20-Feb-2018 10:40 AM 20-Feb-2018 A Approved Closed
Cluster 01 A6 Villa 02
Inspection of installation of ground floor drains gully traps &
Cluster 01 A6
0627 KHEP-ME-0627 Connected waste drainage branch piping as per highlighted Zone 1A
Villa 03
Zone 1A Division 22 19-Feb-2018 20-Feb-2018 10:50 AM 20-Feb-2018 A Approved Closed
Cluster 01 A6 Villa 03
Inspection of installation of ground floor drains gully traps &
Cluster 01 A6
0628 KHEP-ME-0628 Connected waste drainage branch piping as per highlighted Zone 1A
Villa 04
Zone 1A Division 22 19-Feb-2018 20-Feb-2018 9:50 AM 20-Feb-2018 A Approved Closed
Cluster 01 A6 Villa 04
Inspection of installation of ground floor drains gully traps &
Cluster 12 B2
0629 KHEP-ME-0629 Connected waste drainage branch piping as per highlighted Zone 1B
Villa 01
Zone 1B Division 22 19-Feb-2018 20-Feb-2018 11:00 AM 20-Feb-2018 A Approved Closed
Cluster 12 B2 Villa 01
Inspection of installation of ground floor drains gully traps &
Cluster 12 B2
0630 KHEP-ME-0630 Connected waste drainage branch piping as per highlighted Zone 1B
Villa 02
Zone 1B Division 22 19-Feb-2018 20-Feb-2018 11:10 AM 20-Feb-2018 A Approved Closed
Cluster 12 B2 Villa 02
Inspection of installation of underground uPVC soil & waste drainage
Cluster 03 A6
0631 KHEP-ME-0631 piping at ground floor as per highlighted Zone 1A Cluster 03 A6 Villa
Villa 05
Zone 1B Division 22 19-Feb-2018 20-Feb-2018 9:40 AM 20-Feb-2018 A Approved Closed
05
Inspection of installation of underground uPVC soil & waste drainage
Cluster 03 A6
0632 KHEP-ME-0632 piping at ground floor as per highlighted Zone 1A Cluster 03 A6 Villa
Villa 06
Zone 1B Division 22 19-Feb-2018 20-Feb-2018 9:50 AM 20-Feb-2018 A Approved Closed
06
Inspection for installation of vertical pipe sleeves for the penetration
Cluster 55
0633 KHEP-ME-0633 of vent pipe at the stair landing area between ground & first floor as
BC4
Zone 3B Division 22 19-Feb-2018 20-Feb-2018 9:20 AM 20-Feb-2018 A Approved Closed
per highlighted Zone 3B Cluster 55 BC4
Inspection for pipe laying of portable water station 0+12 to station Approved w/
0634 KHEP-ME-0634
0+100 Zone 1B Road 05
Road 05 Zone 1B Division 22 19-Feb-2018 20-Feb-2018 11:20 AM 20-Feb-2018 B comments
Closed

Inspection of installation of vertical pipe sleeves for the penetration


Cluster 18
0635 KHEP-ME-0635 of roof drain condensate drain vent pipe & block outs for mechanical
BC4
Zone 1B Division 22 20-Feb-2018 21-Feb-2018 10:00 AM 21-Feb-2018 A Approved Closed
openings on roof slab as per highlighted Zone 1B Cluster 18 BC4

Inspection of installation of underground uPVC soil & waste drainage


Cluster 03 A6
0636 KHEP-ME-0636 piping at ground floor as per highlighted Zone 1A Cluster 03 A6 Villa
Villa 03
Zone 1A Division 22 20-Feb-2018 21-Feb-2018 10:50 AM 21-Feb-2018 A Approved Closed
03
Inspection of installation of underground uPVC soil & waste drainage
Cluster 03 A6
0637 KHEP-ME-0637 piping at ground floor as per highlighted Zone 1A Cluster 03 A6 Villa
Villa 04
Zone 1A Division 22 20-Feb-2018 21-Feb-2018 11:00 AM 21-Feb-2018 A Approved Closed
04
Inspection of the leak test for the installation of underground uPVC
Cluster 03 A6
0638 KHEP-ME-0638 soil & waste drainage piping at ground floor as per highlighted Zone
Villa 05
Zone 1A Division 22 20-Feb-2018 21-Feb-2018 10:40 AM 21-Feb-2018 A Approved Closed
1A Cluster 03 A6 Villa 05
Inspection of the leak test for the installation of underground uPVC
Cluster 03 A6
0639 KHEP-ME-0639 soil & waste drainage piping at ground floor as per highlighted Zone
Villa 06
Zone 1A Division 22 20-Feb-2018 21-Feb-2018 10:30 AM 21-Feb-2018 A Approved Closed
1A Cluster 03 A6 Villa 06
Inspection of the leak test for the installation ground floor drains
Cluster 12 B2
0640 KHEP-ME-0640 gully traps & connected waste drainage branch piping as per
Villa 01
Zone 1B Division 22 21-Feb-2018 22-Feb-2018 10:00 AM 24-Feb-2018 A Approved Closed
highlighted Zone 1B Cluster 12 B2 Villa 01
Inspection of the leak test for the installation ground floor drains
Cluster 12 B2
0641 KHEP-ME-0641 gully traps & connected waste drainage branch piping as per
Villa 02
Zone 1B Division 22 21-Feb-2018 22-Feb-2018 10:10 AM 24-Feb-2018 A Approved Closed
highlighted Zone 1B Cluster 12 B2 Villa 02
Inspection of the Gravity Test of Sewage line (Short Pieces) (MH-
0642 KHEP-ME-0642 Line 01 NA Division 33 21-Feb-2018 22-Feb-2018 10:10 AM RECALLED
9L01 to MH-8-L01)
Inspection of the Gravity Test of Sewage line (Short Pieces) (MH-9-
0643 KHEP-ME-0643 Line 01 NA Division 33 21-Feb-2018 22-Feb-2018 10:40 AM RECALLED
L01 to MH-1A-L01)
Inspection of the installation of sewage line main line MH-4-L01 MH-
0644 KHEP-ME-0644
3-L01 Line 01
Line 01 NA Division 33 21-Feb-2018 22-Feb-2018 10:50 AM 24-Feb-2018 A Approved Closed

Inspection of the installation of sewage line MH-9-L01 MH-8-L01 Line


0645 KHEP-ME-0645
01
Line 01 NA Division 33 21-Feb-2018 22-Feb-2018 9:50 AM 24-Feb-2018 E Rejected Closed

Inspection of the installation of sewage line MH-9-L01 MH-1A-L09


0646 KHEP-ME-0646
Line 01
Line 01 NA Division 33 21-Feb-2018 22-Feb-2018 9:40 AM 24-Feb-2018 A Approved Closed

Inspection of the installation of underground drainage uPVC soil &


Cluster 09
0647 KHEP-ME-0647 waste piping inside the building as highlighted Zone 1B Cluster 09
BC4 Villa 01
Zone1B Division 22 21-Feb-2018 22-Feb-2018 1:30 PM 24-Feb-2018 A Approved Closed
BC4 Villa 01
Inspection of the installation of underground drainage uPVC soil &
Cluster 06
0648 KHEP-ME-0648 waste piping inside the building as highlighted Zone 1B Cluster 06
BC4 Villa 02
Zone1B Division 22 21-Feb-2018 22-Feb-2018 1:40 PM 24-Feb-2018 A Approved Closed
BC4 Villa 02
Inspection of the installation of underground drainage uPVC soil &
Cluster 06
0649 KHEP-ME-0649 waste piping inside the building as highlighted Zone 1B Cluster 06
BC4 Villa 03
Zone1B Division 22 21-Feb-2018 22-Feb-2018 1:45 PM 24-Feb-2018 A Approved Closed
BC4 Villa 03
Inspection of the installation of underground drainage uPVC soil &
Cluster 21
0650 KHEP-ME-0650 waste piping inside the building as highlighted Zone 1B Cluster 21
BC4 Villa 01
Zone1B Division 22 21-Feb-2018 22-Feb-2018 1:50 PM 24-Feb-2018 A Approved Closed
BC4 Villa 01
Inspection of the installation of underground drainage uPVC soil &
Cluster 21
0651 KHEP-ME-0651 waste piping inside the building as highlighted Zone 1B Cluster 21
BC4 Villa 02
Zone1B Division 22 21-Feb-2018 22-Feb-2018 1:55 PM 24-Feb-2018 A Approved Closed
BC4 Villa 02
Inspection of the leak test for the installation of underground uPVC
Cluster 03 A6
0652 KHEP-ME-0652 soil & waste Drainage piping at ground floor as highlighted Zone 1A
Villa 04
Zone1A Division 22 21-Feb-2018 22-Feb-2018 9:40 AM 24-Feb-2018 E Rejected Closed
Cluster 03 A6 Villa 04
Inspection of the leak test for the installation of underground uPVC
Cluster 03 A6
0652.1 KHEP-ME-0652-01 soil & waste Drainage piping at ground floor as highlighted Zone 1A
Villa 03
Zone1A Division 22 25-Feb-2018 26-Feb-2018 11:10 AM 27-Feb-2018 A Approved Closed
Cluster 03 A6 Villa 03
Inspection of the leak test for the installation of underground uPVC
Cluster 03 A6
0653 KHEP-ME-0653 soil & waste Drainage piping at ground floor as highlighted Zone 1A
Villa 03
Zone1A Division 22 21-Feb-2018 22-Feb-2018 9:45 AM 24-Feb-2018 E Rejected Closed
Cluster 03 A6 Villa 03
Inspection of the leak test for the installation of underground uPVC
Cluster 03 A6
0653.1 KHEP-ME-0653-01 soil & waste Drainage piping at ground floor as highlighted Zone 1A
Villa 04
Zone1A Division 22 25-Feb-2018 26-Feb-2018 11:10 AM 27-Feb-2018 A Approved Closed
Cluster 03 A6 Villa 04
Inspection of the installation of underground uPVC soil & waste
Cluster 03 A6
0654 KHEP-ME-0654 Drainage piping at ground floor as highlighted Zone 1A Cluster 03 A6
Villa 02
Zone1A Division 22 21-Feb-2018 22-Feb-2018 10:00 AM 24-Feb-2018 A Approved Closed
Villa 02
Inspection of the installation of underground uPVC soil & waste
Cluster 03 A6
0655 KHEP-ME-0655 Drainage piping at ground floor as highlighted Zone 1A Cluster 03 A6
Villa 01
Zone1A Division 22 21-Feb-2018 22-Feb-2018 10:10 AM 24-Feb-2018 A Approved Closed
Villa 01

Inspection of installation of upvc soil & waste drainage piping from


Cluster 01 A6
0656 KHEP-ME-0656 ground floor to first floor riser under slab serving ensuite & hall
Villa 03
Zone1A Division 22 21-Feb-2018 22-Feb-2018 10:15 AM 24-Feb-2018 E Rejected Closed
bathroom as per highlighted Zone 1A Cluster 01 A6 Villa 03

Inspection of installation of upvc soil & waste drainage piping from


ground floor to first floor riser & vent line first floor under slab to roof Cluster 01 A6
0657 KHEP-ME-0657
serving ensuite bathroom as per highlighted Zone 1A Cluster 01 A6 Villa 03
Zone1A Division 22 21-Feb-2018 22-Feb-2018 10:20 AM 24-Feb-2018 E Rejected Closed
Villa 03
Inspection for the installation of Vertical Sleeves for the Penetration
0658 KHEP-ME-0658 of Roof Drain, Condensate Drain, Vent Pipe and Block-outs for Cluster 72 B2 Zone 4B Division 22 22-Feb-2018 24-Feb-2018 10:20 AM 25-Feb-2018 A Approved Closed
Mechanical Openings on the Roof Slab
Inspection for the installation of Vertical Sleeves for the Penetration
0659 KHEP-ME-0659 of Roof Drain, Condensate Drain, Vent Pipe and Block-outs for Cluster 35 B2 Zone 2B Division 22 22-Feb-2018 24-Feb-2018 10:20 AM 25-Feb-2018 A Approved Closed
Mechanical Openings on the Roof Slab
Inspection of Installation of Underground UPVC Soil and Waste
0660 KHEP-ME-0660
Drainage Piping at Ground Floor, As per highlighted
Cluster 04 A6 Zone 1A Division 22 22-Feb-2018 24-Feb-2018 10:40 AM 24-Feb-2018 A Approved Closed

Inspection of Underground UPVC Soil and Waste Drainage Piping at


0661 KHEP-ME-0661
Ground Floor As Per Highlighted
Cluster 04 A6 Zone 1A Division 22 22-Feb-2018 24-Feb-2018 10:50 AM 24-Feb-2018 A Approved Closed

Inspection of Underground drainage UPVC Soil and Waste Piping Cluster 21 BC


0662 KHEP-ME-0662
inside the building as per highlighted 4
Zone 1B Division 22 22-Feb-2018 24-Feb-2018 10:50 AM 25-Feb-2018 A Approved Closed

inspection of installation of underground drainage UPVC soil & waste Cluster 06


0663 KHEP-ME-0663
piping inside the building as per highlighted BC 4
Zone 1B Division 22 22-Feb-2018 24-Feb-2018 11:00 AM 25-Feb-2018 A Approved Closed

inspection for the Leak Test of installation of uunderround drainage Cluster 09 Approved w/
0664 KHEP-ME-0664
UPVC soil & waste piping inside the building as per highlighted BC 4
Zone 1B Division 22 22-Feb-2018 24-Feb-2018 11:10 AM 24-Feb-2018 B comments
Closed

Inspection for the installation of Vertical Sleeves for the Penetration


Cluster 58
0665 KHEP-ME-0665 of Roof Drain, Condensate Drain, Vent Pipe and Block-outs for
BC 2
Zone 3B Division 22 24-Feb-2018 25-Feb-2018 10:30 AM 25-Feb-2018 A Approved Closed
Mechanical Openings on the Roof Slab Cluster 58 B2 Zone 3B

Inspection for the installation of vertical pipe sleeves for the


Cluster 23
0666 KHEP-ME-0666 penetration of roof drain condensate drain vent pipe & blockouts for
BC4
Zone 1B Division 22 25-Feb-2018 26-Feb-2018 10:30 AM 27-Feb-2018 A Approved Closed
mechanical openings on the roof slab Zone 1B Cluster 23 BC4

Inspection of installation of gully traps for balcony drain at first floor Cluster 42
0667 KHEP-ME-0667
as per highlighted Zone 2B Cluster 42 BC4 BC4
Zone 2B Division 22 25-Feb-2018 26-Feb-2018 10:00 AM 27-Feb-2018 A Approved Closed

Inspection of installation of underground drainage uPVC soil & waste Cluster 21


0668 KHEP-ME-0668
piping at ground as per highlighted Zone 1B Cluster 21 BC4 Villa 04 BC4 Villa 04
Zone 1B Division 22 25-Feb-2018 26-Feb-2018 11:00 AM 27-Feb-2018 A Approved Closed

Inspection for the gravity leak test of installation of underground soil Cluster 21
0669 KHEP-ME-0669 & waste drainage piping at ground floor inside the building as per BC4 Villa 01, Zone 1B Division 22 25-Feb-2018 26-Feb-2018 11:10 AM 27-Feb-2018 A Approved Closed
highlighted Zone 1B Cluster 21 BC4 Villa 01, 02 02

Inspection witnessing the gravity leak test for the installation of


0670 KHEP-ME-0670 balcony drainage riser including gully traps uPVC installed inside the Cluster 27 B2 Zone 2B Division 22 25-Feb-2018 26-Feb-2018 10:00 AM 28-Feb-2018 A Approved Closed
building as per highlighted Zone 2B Cluster 27 B2
Inspection of installation of underground drainage uPVC soil & waste
Cluster 04 A6
0671 KHEP-ME-0671 piping inside the building as per highlighted Zone 1A Cluster 04 A6
Villa 03, 04
Zone 1A Division 22 25-Feb-2018 26-Feb-2018 11:00 AM 27-Feb-2018 A Approved Closed
Villa 03, 04
Inspection of gravity leak test of sewage line back drop MH-1-L12
0672 KHEP-ME-0672
Line 01
Line 01 NA Division 33 25-Feb-2018 26-Feb-2018 9:26 AM 27-Feb-2018 A Approved Closed

0673 KHEP-ME-0673 Inspection of installation of sewage line back drop MH-1-L11 Line 01 Line 01 NA Division 33 25-Feb-2018 26-Feb-2018 9:05 AM RECALLED

Inspection of leak test of underground drainage uPVC soil & waste


Cluster 06
0674 KHEP-ME-0674 piping installed inside the building as per highlighted Zone 1B Cluster
BC4 Villa 01
Zone 1B Division 22 25-Feb-2018 26-Feb-2018 10:00 AM 27-Feb-2018 A Approved Closed
06 BC4 Villa 01
Inspection of leak test of underground drainage uPVC soil & waste
Cluster 06
0675 KHEP-ME-0675 piping installed inside the building as per highlighted Zone 1B Cluster
BC4 Villa 02
Zone 1B Division 22 25-Feb-2018 26-Feb-2018 10:10 AM 27-Feb-2018 A Approved Closed
06 BC4 Villa 02
Inspection of gravity leak test of sewage line back drop MH-1-L11
0676 KHEP-ME-0676 Line 01 NA Division 33 25-Feb-2018 26-Feb-2018 9:05 AM RECALLED
Line 01
Inspection of gravity leak test of sewage line back drop MH-1A-L11
0677 KHEP-ME-0677 Line 01 NA Division 33 25-Feb-2018 26-Feb-2018 9:15 AM RECALLED
Line 01
Inspection of installation of underground uPVC soil & waste drainage
Cluster 04 A6
0678 KHEP-ME-0678 piping at ground floor as per highlighted Zone 1A Cluster 04 A6 Villa
Villa 01
Zone 1A Division 22 26-Feb-2018 27-Feb-2018 10:00 AM 28-Feb-2018 A Approved Closed
01
Inspection of installation of underground uPVC soil & waste drainage
Cluster 04 A6
0679 KHEP-ME-0679 piping at ground floor as per highlighted Zone 1A Cluster 04 A6 Villa
Villa 02
Zone 1A Division 22 26-Feb-2018 27-Feb-2018 10:00 AM 27-Feb-2018 A Approved Closed
02
Inspection for the installation of gully traps for balcony drain at first Cluster 41
0680 KHEP-ME-0680
floor as per highlighted Zone 2B Cluster 41 BC4 BC4
Zone 2B Division 22 26-Feb-2018 27-Feb-2018 10:30 AM 27-Feb-2018 A Approved Closed

0681 KHEP-ME-0681 Inspection of installation of sewage line backdrop MH-1A-L09 Line 01 Line 01 NA Division 33 26-Feb-2018 27-Feb-2018 10:40 AM 28-Feb-2018 A Approved Closed

0682 KHEP-ME-0682 Inspection of leak test of sewage line backdrop MH-1A-L09 Line 01 Line 01 NA Division 33 26-Feb-2018 27-Feb-2018 10:50 AM 28-Feb-2018 A Approved Closed

Inspection for the leak test of storm line main line & short piece MH-
0683 KHEP-ME-0683
I7-L03 MH-I8-L01 Line 01 Zone 1B
Line 01 Zone 1B Division 33 26-Feb-2018 27-Feb-2018 11:00 AM 28-Feb-2018 A Approved Closed

Inspection for the gravity leak test of storm manhole MH-I7-L03 Line
0684 KHEP-ME-0684
01 Zone 1B
Line 01 Zone 1B Division 33 26-Feb-2018 27-Feb-2018 11:10 AM 28-Feb-2018 A Approved Closed
Inspection for the installation of vertical pipe sleeves for penetration
of drainage & water supply piping & mechanical openingss & vent at Cluster 42
0685 KHEP-ME-0685
first floor slab & pipe sleeve at stair landing between ground & first BC4
Zone 2B Division 22 26-Feb-2018 27-Feb-2018 10:00 AM 27-Feb-2018 A Approved Closed
floor Zone 2B Cluster 42 BC4
Inspection for the leak test of installation of underround drainage
Cluster 03 A6
0686 KHEP-ME-0686 UPVC soil & waste piping at ground floor as per highlighted Zone 1A Zone 1A Division 22 27-Feb-2018 28-Feb-2018 10:10 AM Open
Villa 02
Cluster 03 A6 Villa 02
Inspection for the leak test of installation of underround drainage
Cluster 03 A6
0687 KHEP-ME-0687 UPVC soil & waste piping at ground floor as per highlighted Zone 1A Zone 1A Division 22 27-Feb-2018 28-Feb-2018 10:00 AM Open
Villa 01
Cluster 03 A6 Villa 01
Inspection for the leak test of installation of underround drainage
Cluster 06
0688 KHEP-ME-0688 UPVC soil & waste piping at ground floor as per highlighted Zone 1B Zone 1B Division 22 27-Feb-2018 28-Feb-2018 10:20 AM Open
BC4 Villa 03
Cluster 06 BC4 Villa 03
Inspection for the leak test of installation of underround drainage
Cluster 06
0689 KHEP-ME-0689 UPVC soil & waste piping at ground floor as per highlighted Zone 1B Zone 1B Division 22 27-Feb-2018 28-Feb-2018 10:30 AM Open
BC4 Villa 04
Cluster 06 BC4 Villa 04
Inspection for the leak test of installation of underround drainage
Cluster 21
0690 KHEP-ME-0690 UPVC soil & waste piping at ground floor as per highlighted Zone 1B Zone 1B Division 22 27-Feb-2018 28-Feb-2018 10:40 AM Open
BC4 Villa 03
Cluster 21 BC4 Villa 03
Inspection for the leak test of installation of underround drainage
Cluster 21
0691 KHEP-ME-0691 UPVC soil & waste piping at ground floor as per highlighted Zone 1B Zone 1B Division 22 27-Feb-2018 28-Feb-2018 10:50 AM Open
BC4 Villa 04
Cluster 21 BC4 Villa 04
Inspection for the installation of ground floor drains gully traps &
Cluster 16
0692 KHEP-ME-0692 connected waste drainage branch piping as per highlighted Zone 1B Zone 1B Division 22 27-Feb-2018 28-Feb-2018 11:00 AM Open
BC4 Villa 01
Cluster 16 BC4 Villa 01
Inspection for the installation of ground floor drains gully traps &
Cluster 16
0693 KHEP-ME-0693 connected waste drainage branch piping as per highlighted Zone 1B Zone 1B Division 22 27-Feb-2018 28-Feb-2018 11:10 AM Open
BC4 Villa 02
Cluster 16 BC4 Villa 02

Inspection for the installation of vertical sleeves for the penetration


0694 KHEP-ME-0694 of roof drain condensate drain vent pipe & block outs for mechanical Cluster 54 B2 Zone 3B Division 22 27-Feb-2018 28-Feb-2018 2:00 PM Open
openings on the roof slab Zone 3B Cluster 54 B2

Inspection for the installation of vertical sleeves for the penetration


Cluster 60
0695 KHEP-ME-0695 of roof drain condensate drain vent pipe & block outs for mechanical Zone 3B Division 22 27-Feb-2018 28-Feb-2018 1:30 PM Open
BC4
openings on the roof slab Zone 3B Cluster 60 BC4

Inspection for the installation of ground floor drains gully traps &
Cluster 16
0696 KHEP-ME-0696 connected waste drainage branch piping as per highlighted Zone 1B Zone 1B Division 22 27-Feb-2018 28-Feb-2018 2:00 PM Open
BC4 Villa 03
Cluster 16 BC4 Villa 03
Inspection for the installation of ground floor drains gully traps &
Cluster 16
0697 KHEP-ME-0697 connected waste drainage branch piping as per highlighted Zone 1B Zone 1B Division 22 27-Feb-2018 28-Feb-2018 2:10 PM Open
BC4 Villa 04
Cluster 16 BC4 Villa 04
Inspection for the installation of ground floor drains gully traps &
Cluster 20 B2
0698 KHEP-ME-0698 Connected waste drainage branch piping as per highlighted Zone 1B Zone 1B Division 22 28-Feb-2018 1-Mar-2018 10:00 AM Open
Villa 01
Cluster 20 B2 Villa 01
Inspection for the installation of ground floor drains gully traps &
Cluster 20 B2
0699 KHEP-ME-0699 Connected waste drainage branch piping as per highlighted Zone 1B Zone 1B Division 22 28-Feb-2018 1-Mar-2018 10:10 AM Open
Villa 02
Cluster 20 B2 Villa 02
Inspection for the leak test of installation of underround UPVC soil &
Cluster 04 A6
0700 KHEP-ME-0700 waste drainage piping at ground floor as per highlighted Zone 1A Zone 1A Division 22 28-Feb-2018 1-Mar-2018 10:20 AM Open
Villa 03
Cluster 04 A6 Villa 03
Inspection for the leak test of installation of underround UPVC soil &
Cluster 04 A6
0701 KHEP-ME-0701 waste drainage piping at ground floor as per highlighted Zone 1A Zone 1A Division 22 28-Feb-2018 1-Mar-2018 10:30 AM Open
Villa 04
Cluster 04 A6 Villa 04
Inspection for the leak test of installation of underround UPVC soil &
Cluster 04 A6
0702 KHEP-ME-0702 waste drainage piping at ground floor as per highlighted Zone 1A Zone 1A Division 22 28-Feb-2018 1-Mar-2018 10:40 AM Open
Villa 05
Cluster 04 A6 Villa 05
Inspection for the leak test of installation of underround UPVC soil &
Cluster 04 A6
0703 KHEP-ME-0703 waste drainage piping at ground floor as per highlighted Zone 1A Zone 1A Division 22 28-Feb-2018 1-Mar-2018 10:50 AM Open
Villa 06
Cluster 04 A6 Villa 06
Inspection for the leak test of the installation of ground floor drains
Cluster 16
0704 KHEP-ME-0704 gully traps & connected waste drainage branch piping as per Zone 1B Division 22 28-Feb-2018 1-Mar-2018 11:30 AM Open
BC4 Villa 01
highlighted Zone 1B Cluster 16 BC4 Villa 01
Inspection for the leak test of the installation of ground floor drains
Cluster 16
0705 KHEP-ME-0705 gully traps & connected waste drainage branch piping as per Zone 1B Division 22 28-Feb-2018 1-Mar-2018 11:40 AM Open
BC4 Villa 02
highlighted Zone 1B Cluster 16 BC4 Villa 02
Inspection for the leak test of the installation of ground floor drains
Cluster 16
0706 KHEP-ME-0706 gully traps & connected waste drainage branch piping as per Zone 1B Division 22 28-Feb-2018 1-Mar-2018 11:45 AM Open
BC4 Villa 03
highlighted Zone 1B Cluster 16 BC4 Villa 03
Inspection for the leak test of the installation of ground floor drains
Cluster 16
0707 KHEP-ME-0707 gully traps & connected waste drainage branch piping as per Zone 1B Division 22 28-Feb-2018 1-Mar-2018 11:50 AM Open
BC4 Villa 04
highlighted Zone 1B Cluster 16 BC4 Villa 04

LOW CURRENT (Telecom)


Inspect Installation Layout PVC Sleeves Pipes 110 for Telephone and
001 KHEP-LC-0001 data System Culster 2, Culster 2, A6 NA 22-May-2017 23-May-2017 9:00 AM 24-May-2017 E Rejected Closed
A6
Inspect Installation Layout PVC Sleeves Pipes 110 for Telephone and
Approved w/
001.1 KHEP-LC-0001-01 data System Cluster 2, Cluster 02 A6 NA 27-May-2017 28-May-2017 9:00 AM 30-May-2017 B comments
Closed
A6
Installation of PVC Conduit & Block Out for Duplex data and
002 KHEP-LC-0002 Telephone Outlet at Ground Floor Columns of Cluster 1 Zone Cluster 01 Zone 1A 27-May-2017 28-May-2017 9:30 AM 31-May-2017 E Rejected Closed
1A, Cluster 1
Installation of PVC Conduit & Block Out for Ground Floor Data and
Approved w/
003 KHEP-LC-0003 Telephone Outlet at Cluster 2 Columns Zone 1A, Cluster 02 Zone 1A 31-May-2017 1-Jun-2017 8:00 AM 3-Jun-2017 B comments
Closed
Cluster 2
Installation of Galvanized Steel Boxes for Data a Telephone Outlet at
004 KHEP-LC-0004 Ground Floor Columns of Cluster 2 Zone 1A, Cluster 02 Zone 1A 4-Jun-2017 5-Jun-2017 9:00 AM 6-Jun-2017 E Rejected Closed
Cluster 2
Installation of Galvanized Steel Boxes for Data a Telephone Outlet at
Approved w/
004.1 KHEP-LC-0004-01 Ground Floor Columns of Cluster 2 Cluster 02 Zone 1A 10-Jun-2017 11-Jun-2017 9:00 AM 15-Jun-2017 B comments
Closed
Zone 1A, Cluster 2
Installation of PVC Conduits and Galvanized steel Boxes for Smoke
Approved w/
005 KHEP-LC-0005 Detector and Power Supply Module at roof slab of Cluster 69 Zone Cluster 69 Zone 4B 19-Jun-2017 20-Jun-2017 9:45 AM 4-Jul-2017 B comments
Closed
4B, Cluster 69
Installation of 100 mm dia PVC sleeves for telecommunication
006 KHEP-LC-0006 system at grade beam of cluster 15 Zone Cluster 15 Zone 1B 19-Jun-2017 20-Jun-2017 10:00 AM RECALLED
1B, Cluster 15
Installation of PVC sleeves for Telecommunication System at grade
Approved w/
007 KHEP-LC-0007 beam of Cluster 13 Cluster 13 Zone 1B 28-Jun-2017 29-Jun-2017 8:00 AM 1-Jul-2017 B comments
Closed
Zone 1B, Cluster 13
Installation of PVC sleeves for Telecommunication System at grade
Approved w/
008 KHEP-LC-0008 beam of Cluster 68 Cluster 68 Zone 4B Division 27 2-Jul-2017 3-Jul-2017 8:00 AM 4-Jul-2017 B comments
Closed
Zone 4B, Cluster 68
Installation of PVC sleeves for Telecommunication System at grade
009 KHEP-LC-0009 beam of Cluster 12 Cluster 12 Zone 4B Division 27 8-Jul-2017 9-Jul-2017 8:00 AM 9-Jul-2017 A Approved Closed
Zone 4B, Cluster 12
Installation of PVC Conduit for WAP, Telephone and data outlet at
010 KHEP-LC-0010 first floor slab of Cluster 1 Zone Cluster 01 Zone 1A Division 27 8-Jul-2017 9-Jul-2017 11:00 AM 9-Jul-2017 A Approved Closed
1A, Cluster 1
Installation of PVC Conduits and Galvanized steel Boxes for Smoke
Detector and Power Supply Module at First floor slab of Cluster 1
011 KHEP-LC-0011
Zone 1A,
Cluster 01 Zone 1A Division 28 8-Jul-2017 9-Jul-2017 10:00 AM 12-Jul-2017 B Approved Closed
Cluster 1
Installation of PVC sleeves for Telecommunication System at grade
Approved w/
012 KHEP-LC-0012 beam of Cluster 5 Cluster 5 Zone 1B Division 27 9-Jul-2017 10-Jul-2017 9:30 AM 11-Jul-2017 B comments
Closed
Zone 1B, Cluster 5
Installation of PVC sleeves for Telecommunication System at grade
Approved w/
013 KHEP-LC-0013 beam of Cluster 10 Cluster 10 Zone 1B Division 27 9-Jul-2017 10-Jul-2017 9:40 AM 11-Jul-2017 B comments
Closed
Zone 1B, Cluster 10
Installation of PVC sleeves for Telecommunication System at grade
014 KHEP-LC-0014 beam of Cluster 11 Zone Cluster 11 Zone 1B Division 27 9-Jul-2017 10-Jul-2017 9:50 AM 11-Jul-2017 A Approved Closed
1B, Cluster 11
Installation of PVC Conduits and Galvanized steel Boxes for WAP,
data and Telephone outlet at first floor Columns of Cluster 1 Approved w/
015 KHEP-LC-0015
Zone
Cluster 01 Zone 1A Division 27 16-Jul-2017 17-Jul-2017 11:00 AM 18-Jul-2017 B comments
Closed
1A, Cluster 1

Installation of 50mm PVC sleeves for telecommunication system at


Approved w/
016 KHEP-LC-0016 grade Beam of cluster 17 Cluster 17 Zone 1B Division 27 19-Jul-2017 20-Jul-2017 8:30 AM 22-Jul-2017 B comments
Closed
Zone 1B, Cluster 17
Installation of PVC Conduits and Galvanized steel Boxes for Smoke
Detector and Power Supply Module at First floor slab of Cluster 2 Approved w/
017 KHEP-LC-0017
Zone 1A,
Cluster 02 Zone 1A Division 28 23-Jul-2017 24-Jul-2017 8:00 AM 25-Jul-2017 B comments
Closed
Cluster 2
Installation of PVC conduit for WAP, Telephone and data outlet at
018 KHEP-LC-0018 first floor slab of Cluster 2 Zone Cluster 02 Zone 1A Division 27 24-Jul-2017 25-Jul-2017 11:00 AM 25-Jul-2017 A Approved Closed
1A, Cluster 2
Installation of PVC conduit for WAP, Telephone and data outlet at
019 KHEP-LC-0019 first floor slab of Cluster 15 Zone Cluster 15 Zone 1B Division 27 29-Jul-2017 30-Jul-2017 9:00 AM 30-Jul-2017 A Approved Closed
1B, Cluster 15
Installation of PVC conduit and galvanized steel boxes for smoke
detector and power supply module at first floor slab of Cluster 15 Approved w/
020 KHEP-LC-0020
Zone
Cluster 15 Zone 1B Division 28 29-Jul-2017 30-Jul-2017 10:00 AM 2-Aug-2017 B comments
Closed
1B, Cluster 15
Installation of PVC sleeves for Telecommunication System at grade
021 KHEP-LC-0021 beam of Cluster 3 Zone Cluster 3 Zone 1A Division 27 31-Jul-2017 1-Aug-2017 9:30 AM 2-Aug-2017 A Approved Closed
1A, Cluster 3
Installation of 50mm PVC sleeves for telecommunication system at
022 KHEP-LC-0022 grade Beam of cluster 7 Zone Cluster 7 Zone 1B Division 27 6-Aug-2017 7-Aug-2017 8:15 AM 8-Aug-2017 A Approved Closed
1B, Cluster 7
Installation of PVC Conduits and Galvanized steel Boxes for WAP,
data and Telephone outlet at first floor Columns of Cluster 2 Approved w/
023 KHEP-LC-0023 Cluster 02 Zone 1A Division 27 6-Aug-2017 7-Aug-2017 8:45 AM 8-Aug-2017 B comments
Closed
Zone 1A, Cluster 2
Installation of PVC Conduits and Galvanized steel Boxes for Smoke
Detector and Power Supply Module at First floor slab of Cluster 13 Approved w/
024 KHEP-LC-0024
Zone 1B,
Cluster 13 Zone 1B Divstion 28 6-Aug-2017 7-Aug-2017 9:30 AM 9-Aug-2017 B comments
Closed
Cluster 13
Installation of PVC conduit for WAP, Telephone and data outlet at
025 KHEP-LC-0025 first floor slab of Cluster 13 Zone Cluster 13 Zone 1B Division 27 6-Aug-2017 7-Aug-2017 10:00 AM 7-Aug-2017 A Approved Closed
1B, Cluster 13
Installation of PVC conduit for WAP, Telephone and data outlet at
026 KHEP-LC-0026 first floor slab of Cluster 14 Zone 1B, Cluster 14 Zone 1B Division 27 10-Aug-2017 12-Aug-2017 10:00 AM 13-Aug-2017 A Approved Closed
Cluster 14
Installation of PVC Conduits and Galvanized steel Boxes for Smoke
Detector and Power Supply Module at First floor slab of Cluster 14 Approved w/
027 KHEP-LC-0027
Zone 1B,
Cluster 14 Zone 1B Division 28 10-Aug-2017 12-Aug-2017 11:00 AM 14-Aug-2017 B comments
Closed
Cluster 14
Installation of 32mm HDPE Conduit going to Telephone Cabinet at
028 KHEP-LC-0028 Ground Floor of Cluster 69 Zone 4B, Cluster 69 Zone 4B Division 27 12-Aug-2017 13-Aug-2017 8:00 AM 14-Aug-2017 E Rejected Closed
Cluster 69
Installation of 4" PVC sub duct conduit going to Telephone Cabinet
Approved w/
028.1 KHEP-LC-0028-01 at Ground Floor of Cluster 69 (mock up) Zone 4B, Cluster 69 Zone 4B Division 27 16-Aug-2017 17-Aug-2017 8:00 AM 19-Aug-2017 B comments
Closed
Cluster 69
Installation of 50mm PVC sleeves for telecommunication system at
Approved w/
029 KHEP-LC-0029 grade Beam of cluster 81 Zone Cluster 81 Zone 4A Division 27 14-Aug-2017 15-Aug-2017 8:00 AM 17-Aug-2017 B comments
Closed
4A, Cluster 81
Installation of PVC Conduits and Galvanized steel Boxes for Smoke
Detector and Power Supply Module at Roof floor slab of Cluster 1 Approved w/
030 KHEP-LC-0030
Zone
Cluster 01 Zone 1A Division 27 15-Aug-2017 16-Aug-2017 9:00 AM 19-Aug-2017 B comments
Closed
1A, Cluster 1
Installation of PVC Conduits and Galvanized steel Boxes for Smoke
Detector and Power Supply Module at Roof floor slab of Cluster 12 Approved w/
031 KHEP-LC-0031
Zone 1B,
Cluster 12 Zone 1B Division 27 16-Aug-2017 17-Aug-2017 9:00 AM 19-Aug-2017 B comments
Closed
Cluster 12
Installation of PVC Conduits and Galvanized steel Boxes for
Telephone and Data at Ground floor Columns of Cluster 3
032 KHEP-LC-0032 Cluster 3 Zone 1A Division 27 16-Aug-2017 17-Aug-2017 11:20 AM 19-Aug-2017 A Approved Closed
Zone 1A, Cluster 3
Installation of PVC conduit for WAP, Telephone and data outlet at
033 KHEP-LC-0033 first floor slab of Cluster 12 Zone Cluster 12 Zone 1B Division 27 17-Aug-2017 19-Aug-2017 9:30 AM 20-Aug-2017 A Approved Closed
1B, Cluster 12
Installation of 50mm PVC sleeves for telecommunication system at
034 KHEP-LC-0034 grade Beam of cluster 4 Zone 1A, Cluster 4 Zone 1A Division 27 19-Aug-2017 20-Aug-2017 9:00 AM 21-Aug-2017 A Approved Closed
Cluster 4
Installation of PVC Conduits and Galvanized steel Boxes for Smoke
Detector and Power Supply Module at First floor slab of Cluster 68 Approved w/
035 KHEP-LC-0035
Zone 4B,
Cluster 68 Zone 4B Division 27 20-Aug-2017 21-Aug-2017 8:00 AM 24-Aug-2017 B comments
Closed
Cluster 68
Installation of PVC Conduits and Galvanized steel Boxes for Smoke
Detector and Power Supply Module at First floor slab of Cluster 11 Approved w/
036 KHEP-LC-0036
Zone
Cluster 11 Zone 1B Division 28 21-Aug-2017 22-Aug-2017 9:00 AM 24-Aug-2017 B comments
Closed
1B, Cluster 11
Installation of PVC conduit for WAP, Telephone and data outlet at
037 KHEP-LC-0037 first floor slab of Cluster 68 Zone 4B, Cluster 68 Zone 4B Divstion 27 23-Aug-2017 24-Aug-2017 10:30 AM 26-Aug-2017 E Rejected Closed
Cluster 68
Installation of PVC conduit for WAP, Telephone and data outlet at
Approved w/
037.1 KHEP-LC-0037-01 first floor slab of Cluster 68 Zone 4B, Cluster 68 Zone 4B Division 27 26-Aug-2017 27-Aug-2017 8:30 AM 29-Aug-2017 B comments
Closed
Cluster 68
Installation of PVC conduit for WAP, Telephone and data outlet at
038 KHEP-LC-0038 first floor slab of Cluster 11 Zone Cluster 11 Zone 1B Division 27 23-Aug-2017 24-Aug-2017 11:00 AM 26-Aug-2017 E Rejected Closed
1B, Cluster 11
Installation of PVC conduit for WAP, Telephone and data outlet at
Approved w/
038.1 KHEP-LC-0038-01 first floor slab of Cluster 11 Zone Cluster 11 Zone 1B Division 27 26-Aug-2017 27-Aug-2017 9:30 AM 29-Aug-2017 B comments
Closed
1B, Cluster 11
Installation of PVC sleeves for telecommunication system at grade
039 KHEP-LC-0039 Beam of cluster 16 Cluster 16 Zone 1B Division 27 26-Aug-2017 27-Aug-2017 10:00 AM 29-Aug-2017 A Approved Closed
Zone 1B, Cluster 16
Installation of PVC Conduits and Galvanized steel Boxes for Smoke
Detector and Power Supply Module at First floor slab of Cluster 10
040 KHEP-LC-0040
Zone
Cluster 10 Zone 1B Division 28 29-Aug-2017 30-Aug-2017 10:00 AM 30-Aug-2017 A Approved Closed
1B, Cluster 10
Installation of PVC conduit for WAP, Telephone and data outlet at
041 KHEP-LC-0041 first floor slab of Cluster 10 Zone 1B, Cluster 10 Zone 1B Division 27 29-Aug-2017 30-Aug-2017 11:20 AM 30-Aug-2017 A Approved Closed
Cluster 10
Installation of 50mm PVC sleeves for telecommunication system at
042 KHEP-LC-0042 grade Beam of cluster 19 Zone 1B, Cluster 19 Zone 1B Division 27 6-Sep-2017 7-Sep-2017 9:00 AM 9-Sep-2017 A Approved Closed
Cluster 19
Installation of 50mm PVC sleeves for telecommunication system at
043 KHEP-LC-0043 grade Beam of cluster 8 Zone 1B, Cluster 8 Zone 1B Division 27 6-Sep-2017 7-Sep-2017 9:30 AM 9-Sep-2017 A Approved Closed
Cluster 8
Installation of PVC Conduits and block out (styrofoam) for Telephone
and data at Ground Floor Columns of Cluster 81 Approved w/
044 KHEP-LC-0044
Zone 4A,
Cluster 81 Zone 4A Division 27 7-Sep-2017 9-Sep-2017 8:00 AM 11-Sep-2017 B comments
Closed
Cluster 81
Installation of 50mm PVC sleeves for Telecomunication system at
Approved w/
0045 KHEP-LC-0045 grade beam of Cluster 75 Cluster 75 Zone 4B Division 27 12-Sep-2017 13-Sep-2017 8:00 AM 16-Sep-2017 B comments
Closed
Zone 4B, Cluster 75

Installation of PVC conduits and galvanized steel boxes for smoke


Approved w/
0046 KHEP-LC-0046 detector and power supply module at roof floor slab of Cluster 15. Cluster 15 Zone 1B Division 28 13-Sep-2017 14-Sep-2017 10:00 AM 16-Sep-2017 B comments
Closed
Zone 1B, Cluster 15

Installation of PVC conduits and galvanized steel boxes for smoke


Approved w/
0047 KHEP-LC-0047 detector and power supply module at roof floor slab of Cluster 17. Cluster 17 Zone 1B Division 28 13-Sep-2017 14-Sep-2017 10:30 AM 16-Sep-2017 B comments
Closed
Zone 1B, Cluster 17

Installation of PVC conduit for WAP, telephone and data outlet at


Approved w/
0048 KHEP-LC-0048 first floor slab of Cluster 17 Zone Cluster 17 Zone 1B Division 27 16-Sep-2017 17-Sep-2017 10:30 AM 18-Sep-2017 B comments
Closed
1B, Cluster 17
Installation of 50mm PVC sleeves for telecommunication system at
Approved w/
0049 KHEP-LC-0049 grade beam of Cluster 61 Zone 3B, Cluster 61 Zone 3B Division 27 18-Sep-2017 19-Sep-2017 8:45 AM 20-Sep-2017 B comments
Closed
Cluster 61

Installation of PVC conduits and galvanized steel boxes for smoke


Approved w/
0050 KHEP-LC-0050 detector and power supply module at roof floor slab of Cluster 2. Cluster 02 Zone 1A Division 28 18-Sep-2017 19-Sep-2017 9:00 AM 20-Sep-2017 B comments
Closed
Zone 1A, Cluster 2

Installation of 50mm PVC sleeves for telecommunication system at


Approved w/
0051 KHEP-LC-0051 grade beam of Cluster 6 Zone 1B, Cluster Cluster 6 Zone 1B Division 27 18-Sep-2017 19-Sep-2017 9:30 AM 20-Sep-2017 B comments
Closed
6
Installation of PVC conduit and block out ( Styrofoam) for Telephone
0052 KHEP-LC-0052 and Data at Ground floor Columns of Cluster 4 Cluster 4 Zone 1A Division 27 20-Sep-2017 21-Sep-2017 10:20 AM 24-Sep-2017 A Approved Closed
Zone 1A, Cluster 4
Installation of 50mm PVC sleeves for telecommunication system at
Approved w/
0053 KHEP-LC-0053 grade beam of Cluster 20 Zone 1B, Cluster 20 Zone 1B Division 27 20-Sep-2017 21-Sep-2017 10:40 AM 24-Sep-2017 B comments
Closed
Cluster 20

Installation of PVC conduits and galvanized steel boxes for smoke


Approved w/
0054 KHEP-LC-0054 detector and power supply module at First floor slab of Cluster 5 Cluster 5 Zone 1B Division 28 23-Sep-2017 24-Sep-2017 10:30 AM 26-Sep-2017 B comments
Closed
Zone 1B, Cluster 5

Installation of PVC conduit and block out ( Styrofoam) for Telephone


Approved w/
0055 KHEP-LC-0055 and Data at Ground floor Columns of Cluster 66 Cluster 66 Zone 4A Division 27 23-Sep-2017 24-Sep-2017 11:20 AM 25-Sep-2017 B comments
Closed
Zone 4A, Cluster 66
Installation of PVC conduit for TV, Telephone and Data outlet at
Approved w/
0056 KHEP-LC-0056 Ground floor slab (SOG) of Cluster 69 Cluster 69 Zone 4A Division 27 23-Sep-2017 24-Sep-2017 10:40 AM 25-Sep-2017 B comments
Closed
Zone 4A, Cluster 69

Installation of PVC conduits and galvanized steel boxes for smoke


Approved w/
0057 KHEP-LC-0057 detector and power supply module at First floor slab of Cluster 7 Cluster 7 Zone 1B Division 28 25-Sep-2017 26-Sep-2017 9:00 AM 28-Sep-2017 B comments
Closed
Zone 1B, Cluster 7

Installation of PVC conduit for WAP, telephone and data outlet at


Approved w/
0058 KHEP-LC-0058 first floor slab of Cluster 5 Zone Cluster 5 Zone 1B Division 27 25-Sep-2017 26-Sep-2017 9:30 AM 28-Sep-2017 B comments
Closed
1B, Cluster 5
Installation of 50mm PVC sleeves for telecommunication system at
0059 KHEP-LC-0059 grade beam of Cluster 44 Zone 2A, Cluster 44 Zone 2A Division 27 25-Sep-2017 26-Sep-2017 10:30 AM 4-Oct-2017 E Rejected Closed
Cluster 44
Installation of 150mm and 100mm PVC sleeves for
Approved w/
0059.1 KHEP-LC-0059-01 telecommunication system at grade beam of Cluster 44 Cluster 44 Zone 2A Division 27 5-Oct-2017 7-Oct-2017 11:00 AM 9-Oct-2017 B comments
Closed
Zone 2A, Cluster 44
Installation of PVC conduit for WAP, telephone and data outlet at
Approved w/
0060 KHEP-LC-0060 first floor slab of Cluster 7 Zone Cluster 7 Zone 1B Division 27 27-Sep-2017 28-Sep-2017 9:30 AM 30-Sep-2017 B comments
Closed
1B, Cluster 7
Installation of 50mm PVC sleeves for telecommunication system at
Approved w/
0061 KHEP-LC-0061 grade beam of Cluster 48 Zone 3B, Cluster 48 Zone 3B Division 27 27-Sep-2017 28-Sep-2017 10:50 AM 1-Oct-2017 B comments
Closed
Cluster 48
Installation of 50mm PVC sleeves for telecommunication system at
Zone 3B,
0062 KHEP-LC-0062 grade beam of Cluster 58 Zone 3B,
Cluster 58
Zone 3B Division 27 1-Oct-2017 2-Oct-2017 8:20 AM 2-Oct-2017 E Rejected Closed
Cluster 58
Installation of 150mm and 50mm PVC sleeves for telecommunication
Zone 3B, Approved w/
0062.1 KHEP-LC-0062-01 system at grade beam of Cluster 58 Zone
Cluster 58
Zone 3B Division 27 5-Oct-2017 7-Oct-2017 10:00 AM 9-Oct-2017 B comments
Closed
3B, Cluster 58
Installation of 50mm PVC sleeves for telecommunication system at
Zone 4B,
0063 KHEP-LC-0063 grade beam of Cluster 71 Zone 4B,
Cluster 71
Zone 3B Division 27 1-Oct-2017 2-Oct-2017 8:40 AM 2-Oct-2017 E Rejected Closed
Cluster 71
Installation of 150mm and 50mm PVC sleeves for telecommunication
Zone 4B, Approved w/
0063.1 KHEP-LC-0063-01 system at grade beam of Cluster 71 Zone
Cluster 71
Zone 3B Division 27 5-Oct-2017 7-Oct-2017 10:30 AM 9-Oct-2017 B comments
Closed
4B, Cluster 71
Installation of Gl boxes and PVC conduit for WAP, Telephone and
data outlet at ground floor and first floor of mock - up building
0064 KHEP-LC-0064 Cluster 69 Zone 4B Division 27 1-Oct-2017 2-Oct-2017 10:30 AM RECALLED
cluster 69 Zone 4B,
Cluster 69
Installation of PVC conduits and galvanized steel boxes for smoke
detector and power supply module at First floor slab of Cluster 14 Approved w/
0065 KHEP-LC-0065
Zone 1B, Cluster
Cluster 14 Zone 1B Division 28 3-Oct-2017 4-Oct-2017 9:00 AM 7-Oct-2017 B comments
Closed
14
Installation of PVC conduits and galvanized steel boxes for smoke
detector and power supply module at First floor slab of Cluster 11 Approved w/
0066 KHEP-LC-0066
Zone 1B, Cluster
Cluster 11 Zone 1B Division 28 5-Oct-2017 7-Oct-2017 8:00 AM 9-Oct-2017 B comments
Closed
11
Installation of 150mm and 50mm PVC sleeves for telecommunication
Approved w/
0067 KHEP-LC-0067 system at grade beam of Cluster 73 Zone Cluster 73 Zone 4B Division 28 5-Oct-2017 7-Oct-2017 8:30 AM 9-Oct-2017 B comments
Closed
4B, Cluster 73
Installation of PVC conduits and galvanized steel boxes for smoke
detector and power supply module at roof floor slab of Cluster 13 Approved w/
0068 KHEP-LC-0068
Zone 1B, Cluster
Cluster 13 Zone 1B Division 28 9-Oct-2017 10-Oct-2017 9:00 AM 11-Oct-2017 B comments
Closed
13
Installation of PVC conduits and galvanized steel boxes for smoke
detector and power supply module at roof floor slab of Cluster 10 Approved w/
0069 KHEP-LC-0069
Zone 1B, Cluster
Cluster 13 Zone 1B Division 28 9-Oct-2017 10-Oct-2017 9:30 AM 11-Oct-2017 B comments
Closed
10
Installation of 150mm and 100mm PVC sleeves for
telecommunication system at grade beam of Cluster 54 (100mm
0070 KHEP-LC-0070
sleeves for water IP connection Zone 3B,
Cluster 54 Zone 3B Division 27 9-Oct-2017 10-Oct-2017 9:00 AM 12-Oct-2017 A Approved Closed
Cluster 54
Installation of PVC conduit blockout (styrofoam) for telephone and
Approved w/
0071 KHEP-LC-0071 data at ground floor column of Cluster 44 Cluster 44 Zone 2A Division 27 10-Oct-2017 11-Oct-2017 10:50 AM 12-Oct-2017 B comments
Closed
Zone 2A, Cluster 44
Installation of 150mm and 110mm PVC sleeves for
telecommunication system at grade beam of Cluster 51 (110mm Approved w/
0072 KHEP-LC-0072
sleeves for water meter IP connection)
Cluster 51 Zone 3B Division 27 10-Oct-2017 11-Oct-2017 11:00 AM 12-Oct-2017 B comments
Closed
Zone 3B, Cluster 51
Installation of 150mm and 110mm PVC sleeves for
telecommunication system at grade beam of Cluster 52 (110mm Approved w/
0073 KHEP-LC-0073
sleeves for water meter IP connection)
Cluster 52 Zone 3B Division 27 14-Oct-2017 15-Oct-2017 8:30 AM 17-Oct-2017 B comments
Closed
Zone 3B, Cluster 52
Installation of 150mm and 110mm PVC sleeves for
telecommunication system at grade beam of Cluster 9 (110mm Approved w/
0074 KHEP-LC-0074
sleeves for water meter IP connection)
Cluster 9 Zone 1B Division 27 14-Oct-2017 15-Oct-2017 9:30 AM 17-Oct-2017 B comments
Closed
Zone 1B, Cluster 9
Installation of 6" and 4" PVC sleeves for telecommunication system
at grade beam of Cluster 27 (4" sleeves for water meter IP Approved w/
0075 KHEP-LC-0075
connection) Zone 2B,
Cluster 27 Zone 2B Division 27 16-Oct-2017 17-Oct-2017 8:30 AM 23-Oct-2017 B comments
Closed
Cluster 27
Installation of PVC conduits and galvanized steel boxes for Fire
Detection and Alarm System at roof floor slab of Cluster 12 Approved w/
0076 KHEP-LC-0076
Zone 1B, Cluster
Cluster 12 Zone 1B Division 28 16-Oct-2017 17-Oct-2017 9:00 AM 18-Oct-2017 B comments
Closed
12

Installation of PVC conduits for telecommunication system at ground


Floor of Cluster 1 (2-25mm for KWH and Water meter IP Connection
0077 KHEP-LC-0077
and 4 inch for Subduct) Note: For Four (4) Apartments Only
Cluster 01 Zone 1A Division 28 17-Oct-2017 18-Oct-2017 8:30 AM 23-Oct-2017 E Rejected Closed
Zone 1A, Cluster 1

Installation of PVC conduits for telecommunication system at ground


Floor of Cluster 1 (2-25mm for KWH and Water meter IP Connection Approved w/
0077.1 KHEP-LC-0077-01
and 4 inch for Subduct) Note: For Four (4) Apartments Only
Cluster 01 Zone 1A Division 28 30-Oct-2017 31-Oct-2017 9:40 AM 5-Nov-2017 B comments
Closed
Zone 1A, Cluster 1

Installation of PVC conduits for telecommunication system at ground


Floor of Cluster 15 (2-25mm for KWH and Water meter IP
0078 KHEP-LC-0078
Connection and 4 inch for Subduct)
Cluster 15 Zone 1B Division 28 17-Oct-2017 18-Oct-2017 9:00 AM 23-Oct-2017 E Rejected Closed
Zone 1B, Cluster 15
Installation of PVC conduits for telecommunication system at ground
Floor of Cluster 15 (2-25mm for KWH and Water meter IP Approved w/
0078.1 KHEP-LC-0078-01
Connection and 4 inch for Subduct) Zone 1B, Cluster
Cluster 15 Zone 1B Division 28 30-Oct-2017 31-Oct-2017 9:50 AM 4-Nov-2017 B comments
Closed
15
Installation of 6" and 4" PVC sleeves for telecommunication system
at grade beam of Cluster 43 (4" sleeves for water meter IP Approved w/
0079 KHEP-LC-0079
connection 6" for Subduct)
Cluster 43 Zone 2A Division 27 17-Oct-2017 18-Oct-2017 10:00 AM 23-Oct-2017 B comments
Closed
Zone 2A, Cluster 43
Installation of PVC conduits and galvanized steel boxes for Fire
Detection and Alarm System at roof floor slab of Cluster 68 Approved w/
0080 KHEP-LC-0080
Zone 4B, Cluster
Cluster 68 Zone 4B Division 28 21-Oct-2017 22-Oct-2017 8:00 AM 23-Oct-2017 B comments
Closed
68
Installation of 6" and 4" PVC sleeves for telecommunication system
at grade beam of Cluster 72 (4" sleeves for water meter IP Approved w/
0081 KHEP-LC-0081
connection 6" for Subduct)
Cluster 72 Zone 4B Division 27 21-Oct-2017 22-Oct-2017 8:30 AM 24-Oct-2017 B comments
Closed
Zone 4B, Cluster 72
Installation of 6" and 4" PVC sleeves for telecommunication system
at grade beam of Cluster 35 (4" sleeves for water meter IP Approved w/
0082 KHEP-LC-0082
connection 6" for Subduct)
Cluster 35 Zone 2B Division 27 21-Oct-2017 22-Oct-2017 9:00 AM 24-Oct-2017 B comments
Closed
Zone 2B, Cluster 35
Installation of PVC conduit blockout (styrofoam) for telephone and
Approved w/
0083 KHEP-LC-0083 data at ground floor column of Cluster 43 Cluster 43 Zone 2A Division 27 21-Oct-2017 22-Oct-2017 9:40 AM 24-Oct-2017 B comments
Closed
Zone 2A, Cluster 43
Installation of PVC sleeves for telecommunication system at Ground
floor of Cluster 1 (2-25mm for KWH and Water IP connection and 4
0084 KHEP-LC-0084
inch for subduct) Noted For the remaining 2 Apartments
Cluster 01 Zone 1A Division 28 21-Oct-2017 22-Oct-2017 10:40 AM 24-Oct-2017 E Rejected Closed
Zone 1A, Cluster 1

Installation of PVC sleeves for telecommunication system at Ground


floor of Cluster 1 (2-25mm for KWH and Water IP connection and 4 Approved w/
0084.1 KHEP-LC-0084-01
inch for subduct) Noted For the remaining 2 Apartments
Cluster 01 Zone 1A Division 28 30-Oct-2017 31-Oct-2017 10:00 AM 5-Nov-2017 B comments
Closed
Zone 1A, Cluster 1

Installation of 6" and 4" PVC sleeves for telecommunication system


at grade beam of Cluster 33 (4" sleeves for water meter IP Approved w/
0085 KHEP-LC-0085
connection 6" for Subduct)
Cluster 33 Zone 2B Division 27 21-Oct-2017 22-Oct-2017 2:00 PM 24-Oct-2017 B comments
Closed
Zone 2B, Cluster 33
Installation of PVC conduits and galvanized steel boxes for Fire
Detection and Alarm System at roof floor slab of Cluster 17 Approved w/
0086 KHEP-LC-0086
Zone 1B, Cluster
Cluster 17 Zone 1B Division 28 22-Oct-2017 23-Oct-2017 8:00 AM 25-Oct-2017 B comments
Closed
17
Installation of PVC conduits for telecommunication system at Ground
floor of Cluster 14 (2-25mm for KWH and Water IP connection and 4
0087 KHEP-LC-0087 Cluster 14 Zone 1B Division 28 23-Oct-2017 24-Oct-2017 9:45 AM RECALLED
inch for subduct)
Zone 1B, Cluster 14
Installation of PVC conduits for telecommunication system at Ground
floor of Cluster 2 (2-25mm for KWH and Water IP connection and 4 Approved w/
0088 KHEP-LC-0088
inch for subduct)
Cluster 02 Zone 1A Division 28 23-Oct-2017 24-Oct-2017 10:00 AM 26-Oct-2017 B comments
Closed
Zone 1A, Cluster 2
Installation of PVC conduits and galvanized steel boxes for Fire
Approved w/
0089 KHEP-LC-0089 Detection and Alarm System at Roof floor slab of Cluster 5 Zone 1B, Cluster 5 Zone 1B Division 28 25-Oct-2017 26-Oct-2017 8:00 AM 26-Oct-2017 B comments
Closed
Cluster 5
Installation of PVC conduits and galvanized steel boxes for Fire
Approved w/
0090 KHEP-LC-0090 Detection and Alarm System at Roof floor slab of Cluster 7 Zone 1B, Cluster 7 Zone 1B Division 28 29-Oct-2017 30-Oct-2017 8:00 AM 31-Oct-2017 B comments
Closed
Cluster 7
Installation of 6" and 4" PVC sleeves for telecommunication system
Approved w/
0091 KHEP-LC-0091 at grade beam of Cluster 34 (4" sleeves for water meter IP Cluster 34 Zone 2B Division 27 29-Oct-2017 30-Oct-2017 9:30 AM 5-Nov-2017 B comments
Closed
connection 6" for Subduct) Zone 2B, Cluster 34
Installation of PVC conduits and galvanized steel boxes for Fire
Approved w/
0092 KHEP-LC-0092 Detection and Alarm System at First floor slab of Cluster 8 Zone 1B, Cluster 8 Zone 1B Division 28 30-Oct-2017 31-Oct-2017 10:00 AM 1-Nov-2017 B comments
Closed
Cluster 8
Installation of PVC conduit for WAP, telephone and data outlet at Approved w/
0093 KHEP-LC-0093
first floor slab of Cluster 8 Zone 1B, Cluster 8
Cluster 8 Zone 1B Division 27 30-Oct-2017 31-Oct-2017 10:20 AM 4-Nov-2017 B comments
Closed

Installation of PVC conduits for telecommunication system at Ground


Approved w/
0094 KHEP-LC-0094 floor of Cluster 14 (2-25mm for KWH and Water IP connection and 4 Cluster 14 Zone 1B Division 28 30-Oct-2017 31-Oct-2017 10:30 AM 4-Nov-2017 B comments
Closed
inch for subduct) Zone 1B, Cluster 14
Installation of PVC conduits for telecommunication system at Ground
Approved w/
0095 KHEP-LC-0095 floor of Cluster 13 (2-25mm for KWH and Water IP connection and 4 Cluster 13 Zone 1B Division 28 30-Oct-2017 31-Oct-2017 10:45 AM 4-Nov-2017 B comments
Closed
inch for subduct) Zone 1B, Cluster 13
Installation of 6" and 4" PVC sleeves for telecommunication system
Approved w/
0096 KHEP-LC-0096 at grade beam of Cluster 63 (4" sleeves for water meter IP Cluster 63 Zone 3B Division 27 31-Oct-2017 1-Nov-2017 8:00 AM 4-Nov-2017 B comments
Closed
connection 6" for Subduct) Zone 3B, Cluster 63
Installation of PVC conduits and galvanized steel boxes for Fire
Approved w/
0097 KHEP-LC-0097 Detection and Alarm System at First floor slab of Cluster 75 Zone 4B, Cluster 75 Zone 4B Division 28 4-Nov-2017 5-Nov-2017 8:00 AM 6-Nov-2017 B comments
Closed
Cluster 75
Installation of PVC conduit for WAP, Telephone and data outlet at Approved w/
0098 KHEP-LC-0098
first floor slab of cluster 75 Zone 4B, Cluster 75
Cluster 75 Zone 4B Division 27 4-Nov-2017 5-Nov-2017 8:30 AM 8-Nov-2017 B comments
Closed

Installation of PVC conduits and galvanized steel boxes for Fire


0099 KHEP-LC-0099 Detection and Alarm System at First floor slab of Cluster 61 Zone 3B, Cluster 61 Zone 3B Division 28 8-Nov-2017 9-Nov-2017 8:00 AM 13-Nov-2017 E Rejected Closed
Cluster 61
Installation of PVC conduits and galvanized steel boxes for Fire
Approved w/
0099.1 KHEP-LC-0099-01 Detection and Alarm System at First floor slab of Cluster 61 Zone 3B, Cluster 61 Zone 3B Division 28 14-Nov-2017 14-Nov-2017 8:00 AM 22-Nov-2017 B comments
Closed
Cluster 61
Installation of PVC conduits and galvanized steel boxes for Fire
0100 KHEP-LC-0100 Detection and Alarm System at First floor slab of Cluster 3 Zone 1A, Cluster 3 Zone 1A Division 28 8-Nov-2017 9-Nov-2017 9:00 AM 13-Nov-2017 E Rejected Closed
Cluster 3
Installation of PVC conduits and galvanized steel boxes for Fire
Approved w/
0100.1 KHEP-LC-0100-01 Detection and Alarm System at First floor slab of Cluster 3 Zone 1A, Cluster 3 Zone 1A Division 28 14-Nov-2017 14-Nov-2017 9:00 AM 22-Nov-2017 B comments
Closed
Cluster 3
Installation of PVC conduit and Gl boxes for ground floor Mechanical
Approved w/
0101 KHEP-LC-0101 Equipment Control Systme at First Floor Slab of cluster 61 Cluster 61 Zone 3B Division 26 9-Nov-2017 11-Nov-2017 8:00 AM 12-Nov-2017 B comments
Closed
Zone 3B, Cluster 61

Installation of PVC conduit for WAP, Telephone and data outlet at


Approved w/
0102 KHEP-LC-0102 first floor slab of cluster 61 Cluster 61 Zone 3B Division 26 9-Nov-2017 11-Nov-2017 8:20 AM 14-Nov-2017 B comments
Closed
Zone 3B, Cluster 61
Installation of 6" and 4" PVC sleeves for telecommunication system
at grade beam of Cluster 64 (4" sleeves for water meter IP Approved w/
0103 KHEP-LC-0103
connection 6" for Subduct)
Cluster 64 Zone 3B Division 26 11-Nov-2017 12-Nov-2017 8:00 AM 14-Nov-2017 B comments
Closed
Zone 3B, Cluster 64
Installation of PVC conduits and galvanized steel boxes for Ground
Floor Fire Detection and Alarm System at First floor slab of Cluster 19 Approved w/
0104 KHEP-LC-0104
Zone
Cluster 19 Zone 1B Division 28 11-Nov-2017 12-Nov-2017 9:00 AM 15-Nov-2017 B comments
Closed
1B, Cluster 19

Installation of PVC conduit and Gl boxes for ground floor Mechanical


Approved w/
0105 KHEP-LC-0105 Equipment Control Systme at First Floor Slab of cluster 3 Cluster 3 Zone 1A Division 26 12-Nov-2017 13-Nov-2017 9:00 AM 14-Nov-2017 B comments
Closed
Zone 1A, Cluster 3

Installation of PVC conduit for WAP, Telephone and data outlet at


Approved w/
0106 KHEP-LC-0106 first floor slab of cluster 3 Cluster 3 Zone 1A Division 27 12-Nov-2017 13-Nov-2017 9:20 AM 14-Nov-2017 B comments
Closed
Zone 1A, Cluster 3

Installation of PVC conduit and Gl boxes for ground floor Mechanical


Approved w/
0107 KHEP-LC-0107 Equipment Control Systme at First Floor Slab of cluster 19 Cluster 19 Zone 1B Division 26 14-Nov-2017 15-Nov-2017 8:30 AM 16-Nov-2017 B comments
Closed
Zone 1B, Cluster 19

Installation of PVC conduit for WAP, Telephone and data outlet at


Approved w/
0108 KHEP-LC-0108 first floor slab of cluster Cluster 19 Zone 1B Division 26 14-Nov-2017 15-Nov-2017 8:40 AM 16-Nov-2017 B comments
Closed
Zone 1B, Cluster 19

Installation of PVC conduits and galvanized steel box for Thermostat


0109 KHEP-LC-0109 at First floor Family Room of Unit B Cluster 69 Cluster 69 Zone 4B Division 27 14-Nov-2017 15-Nov-2017 1:30 PM RECALLED
Zone 4B, Cluster 69

Installation of PVC conduits and galvanized steel box


Telecommunication Outlets at Ground floor First Floor of Unit B
0110 KHEP-LC-0110 Cluster 69 Zone 4B Division 27 14-Nov-2017 15-Nov-2017 1:50 PM RECALLED
Cluster 69
Zone 4B, Cluster 69
Installation of PVC conduits and galvanized steel boxes for Ground
Floor Fire Detection and Alarm System at First floor slab of Cluster 16 Approved w/
0111 KHEP-LC-0111
Zone
Cluster 16 Zone 1B Division 28 16-Nov-2017 18-Nov-2017 8:00 AM 22-Nov-2017 B comments
Closed
1B, Cluster 16
Installation of PVC conduits and galvanized steel boxes for Ground
Floor Fire Detection and Alarm System at First floor slab of Cluster 48 Approved w/
0112 KHEP-LC-0112
Zone
Cluster 48 Zone 3B Division 28 18-Nov-2017 19-Nov-2017 8:00 AM 22-Nov-2017 B comments
Closed
3B, Cluster 48

Installation of PVC conduit and Gl boxes for ground floor Mechanical


Approved w/
0113 KHEP-LC-0113 Equipment Control Systme at First Floor Slab of cluster 48 Cluster 48 Zone 3B Division 26 18-Nov-2017 19-Nov-2017 8:20 AM 20-Nov-2017 B comments
Closed
Zone 3B, Cluster 48

Installation of PVC conduit and Gl boxes for ground floor Mechanical


0114 KHEP-LC-0114 Equipment Control Systme at First Floor Slab of cluster 16 Cluster 16 Zone 1B Division 26 18-Nov-2017 19-Nov-2017 10:40 AM RECALLED
Zone 1B, Cluster 16

Installation of PVC conduit for WAP, Telephone and data outlet at


0115 KHEP-LC-0115 first floor slab of cluster 16 Cluster 16 Zone 1B Division 27 18-Nov-2017 19-Nov-2017 11:00 AM 26-Nov-2017 E Rejected Closed
Zone 1B, Cluster 16
Installation of PVC conduit for WAP, Telephone and data outlet at
Approved w/
0115.1 KHEP-LC-0115-01 first floor slab of cluster 16 Cluster 16 Zone 1B Division 27 27-Nov-2017 28-Nov-2017 8:30 AM 29-Nov-2017 B comments
Closed
Zone 1B, Cluster 16
Installation of PVC conduit for WAP, Telephone and data outlet at
Approved w/
0116 KHEP-LC-0116 first floor slab of cluster 48 Cluster 48 Zone 3B Division 27 19-Nov-2017 20-Nov-2017 8:00 AM 23-Nov-2017 B comments
Closed
Zone 3B, Cluster 48
Installation of PVC conduits and galvanized steel boxes for Ground
Floor Fire Detection and Alarm System at First floor slab of Cluster 6 Approved w/
0117 KHEP-LC-0117
Zone
Cluster 6 Zone 1B Division 28 19-Nov-2017 20-Nov-2017 8:30 AM 26-Nov-2017 B comments
Closed
1B, Cluster 6
Installation of PVC conduits and galvanized steel boxes for Ground
Floor Fire Detection and Alarm System at First floor slab of Cluster 20 Approved w/
0118 KHEP-LC-0118
Zone
Cluster 20 Zone 1B Division 28 20-Nov-2017 21-Nov-2017 8:00 AM 26-Nov-2017 B comments
Closed
1B, Cluster 20
Installation of PVC conduit for WAP, Telephone and data outlet at
Approved w/
0119 KHEP-LC-0119 first floor slab of cluster 20 Cluster 20 Zone 1B Division 26 23-Nov-2017 25-Nov-2017 8:00 AM 27-Nov-2017 B comments
Closed
Zone 1B, Cluster 20

Installation of PVC conduit and Gl boxes for ground floor Mechanical


Approved w/
0120 KHEP-LC-0120 Equipment Control Systme at First Floor Slab of cluster 20 Cluster 20 Zone 1B Division 26 23-Nov-2017 25-Nov-2017 8:30 AM 27-Nov-2017 B comments
Closed
Zone 1B, Cluster 20

Installation of 6" and 4" PVC sleeves for telecommunication system


at grade beam of Cluster 65 (4" sleeves for water meter IP Approved w/
0121 KHEP-LC-0121
connection 6" for Subduct)
Cluster 65 Zone 4B Division 27 23-Nov-2017 25-Nov-2017 9:00 AM 27-Nov-2017 B comments
Closed
Zone 4B, Cluster 65
Installation of PVC conduits for telecommunication system at Ground
0122 KHEP-LC-0122 floor Slab on Grade of Cluster 69 Unit B Cluster 69 Zone 4B Division 27 25-Nov-2017 26-Nov-2017 8:00 AM RECALLED
Zone 4B, Cluster 69
Installation of PVC conduits and galvanized steel boxes for Ground
Floor Fire Detection and Alarm System at First floor slab of Cluster 71 Approved w/
0123 KHEP-LC-0123
Zone
Cluster 71 Zone 4B Division 28 25-Nov-2017 26-Nov-2017 8:30 AM 29-Nov-2017 B comments
Closed
4B, Cluster 71
Installation of PVC conduit for WAP, Telephone and data outlet at
Approved w/
0124 KHEP-LC-0124 first floor slab of cluster 71 Cluster 71 Zone 4B Division 27 25-Nov-2017 26-Nov-2017 8:50 AM 27-Nov-2017 B comments
Closed
Zone 4B, Cluster 71

Installation of PVC conduit and Gl boxes for ground floor Mechanical


Approved w/
0125 KHEP-LC-0125 Equipment Control Systme at First Floor Slab of cluster 71 Cluster 71 Zone 4B Division 27 25-Nov-2017 26-Nov-2017 9:10 AM 27-Nov-2017 B comments
Closed
Zone 4B, Cluster 71

Installation of 6" and 4" PVC sleeves for telecommunication system


at grade beam of Cluster 21 (4" sleeves for water meter IP Approved w/
0126 KHEP-LC-0126
connection 6" for Subduct)
Cluster 21 Zone 1B Division 27 25-Nov-2017 26-Nov-2017 9:30 AM 27-Nov-2017 B comments
Closed
Zone 1B, Cluster 21
Installation of PVC conduit and Gl boxes for ground floor Mechanical
Equipment Control Systme at First Floor Slab of cluster 16 Approved w/
0127 KHEP-LC-0127
Zone 1B, Cluster 16 (BC4
Cluster 16 Zone 1B Division 26 2-Dec-2017 3-Dec-2017 8:00 AM 3-Dec-2017 B comments
Closed
Type)

Installation of PVC conduit and Gl boxes for ground floor Mechanical


Approved w/
0128 KHEP-LC-0128 Equipment Control Systme at First Floor Slab of cluster 6 Cluster 6 Zone 1B Division 26 2-Dec-2017 3-Dec-2017 8:40 AM 3-Dec-2017 B comments
Closed
Zone 1B, Cluster 6

Installation of PVC conduit for WAP, Telephone and data outlet at


Approved w/
0129 KHEP-LC-0129 first floor slab of cluster 6 Cluster 6 Zone 1B Division 26 27-Nov-2017 28-Nov-2017 9:00 AM 29-Nov-2017 B comments
Closed
Zone 1B, Cluster 6
Installation of PVC conduit for WAP, Telephone and data outlet at
Approved w/
0130 KHEP-LC-0130 first floor slab of cluster 51 Cluster 51 Zone 3B Division 27 28-Nov-2017 29-Nov-2017 8:00 AM 30-Nov-2017 B comments
Closed
Zone 3B, Cluster 51
Installation of PVC conduits and galvanized steel boxes for Ground
Floor Fire Detection and Alarm System at First floor slab of Cluster 51 Approved w/
0131 KHEP-LC-0131
Zone
Cluster 51 Zone 3B Division 28 28-Nov-2017 29-Nov-2017 8:30 AM 4-Dec-2017 B comments
Closed
3B, Cluster 51

Installation of PVC conduit and Gl boxes for ground floor Mechanical


0132 KHEP-LC-0132 Equipment Control Systme at First Floor Slab of cluster 51 Cluster 51 Zone 3B Division 26 29-Nov-2017 30-Nov-2017 8:00 AM 2-Dec-2017 A Approved Closed
Zone 3B, Cluster 51

Installation of PVC conduits and galvanized steel boxes for Ground


Approved w/
0133 KHEP-LC-0133 Floor Fire Detection and Alarm System at First floor slab of Cluster 4 Cluster 4 Zone 1A Division 28 29-Nov-2017 30-Nov-2017 10:00 AM 4-Dec-2017 B comments
Closed
Zone 1A, Cluster 4

Installation of PVC conduit and Gl boxes for ground floor Mechanical


0134 KHEP-LC-0134 Equipment Control Systme at First Floor Slab of cluster 4 Cluster 4 Zone 1A Division 26 29-Nov-2017 30-Nov-2017 10:30 AM 2-Dec-2017 A Approved Closed
Zone 1A, Cluster 4

Installation of PVC conduits and galvanized steel boxes for Ground


Floor Fire Detection and Alarm System at First floor slab of Cluster 27 Approved w/
0135 KHEP-LC-0135
Zone
Cluster 27 Zone 2B Division 28 29-Nov-2017 30-Nov-2017 11:00 AM 4-Dec-2017 B comments
Closed
2B, Cluster 27
Installation of PVC conduit for WAP, Telephone and data outlet at
Approved w/
0136 KHEP-LC-0136 first floor slab of cluster 27 Cluster 27 Zone 2B Division 27 29-Nov-2017 30-Nov-2017 11:30 AM 2-Dec-2017 B comments
Closed
Zone 2B, Cluster 27
Installation of PVC conduit for WAP, Telephone and data outlet at
Approved w/
0137 KHEP-LC-0137 first floor slab of cluster 4 Cluster 4 Zone 1A Division 26 30-Nov-2017 2-Dec-2017 8:00 AM 4-Dec-2017 B comments
Closed
Zone 1A, Cluster 4

Installation of PVC conduit and Gl boxes for ground floor Mechanical


0138 KHEP-LC-0138 Equipment Control Systme at First Floor Slab of cluster 27 Cluster 27 Zone 2B Division 26 2-Dec-2017 3-Dec-2017 8:00 AM 4-Dec-2017 A Approved Closed
Zone 2B, Cluster 27

Installation of 6" and 4" PVC sleeves for telecommunication system


at grade beam of Cluster 30 (4" sleeves for water meter IP Approved w/
0139 KHEP-LC-0139
connection 6" for Subduct)
Cluster 30 Zone 2B Division 27 2-Dec-2017 3-Dec-2017 8:20 AM 4-Dec-2017 B comments
Closed
Zone 2B, Cluster 30
Installation of PVC conduits and galvanized steel boxes for Ground
Floor Fire Detection and Alarm System at First floor slab of Cluster 73 Approved w/
0140 KHEP-LC-0140
Zone
Cluster 73 Zone 4B Division 28 2-Dec-2017 3-Dec-2017 9:00 AM 5-Dec-2017 B comments
Closed
4B, Cluster 73

Installation of PVC conduit and Gl boxes for First & Roof floor
0141 KHEP-LC-0141 Mechanical Equipment Control Systme at Roof Slab of cluster 8 Cluster 8 Zone 1B Division 26 2-Dec-2017 3-Dec-2017 9:30 AM 4-Dec-2017 A Approved Closed
Zone 1B, Cluster 8

Installation of PVC conduits and galvanized steel boxes for First Floor
Approved w/
0142 KHEP-LC-0142 Fire Detection and Alarm System at Roof slab of Cluster 8 Cluster 8 Zone 1B Division 28 2-Dec-2017 3-Dec-2017 10:00 AM 5-Dec-2017 B comments
Closed
Zone 1B, Cluster 8

Installation of 3" PVC sleeves and Blockout for telecommunication


system at grade beam of Cluster 18 (3" water meter IP connection Approved w/
0143 KHEP-LC-0143
and Block out for Subduct)
Cluster 18 Zone 1B Division 27 2-Dec-2017 3-Dec-2017 10:30 AM 4-Dec-2017 B comments
Closed
Zone 1B, Cluster 18
Installation of 6" and 4" PVC sleeves for telecommunication system
at grade beam of Cluster 23 (4" sleeves for water meter IP Approved w/
0144 KHEP-LC-0144
connection 6" for Subduct)
Cluster 23 Zone 1B Division 27 2-Dec-2017 3-Dec-2017 11:00 AM 4-Dec-2017 B comments
Closed
Zone 1B, Cluster 23
Installation of PVC conduits and galvanized steel boxes for Ground
Floor Fire Detection and Alarm System at First Floor slab of Cluster Approved w/
0145 KHEP-LC-0145
33
Cluster 33 Zone 2B Division 28 3-Dec-2017 4-Dec-2017 8:00 AM 5-Dec-2017 B comments
Closed
Zone 2B, Cluster 33

Installation of PVC conduit and Gl boxes for Ground floor Mechanical


Approved w/
0146 KHEP-LC-0146 Equipment Control Systme at First Floor Slab of cluster 33 Cluster 33 Zone 2B Division 26 3-Dec-2017 4-Dec-2017 8:30 AM 5-Dec-2017 B comments
Closed
Zone 2B, Cluster 33

Installation of PVC conduit and Gl boxes for Ground floor Mechanical


0147 KHEP-LC-0147 Equipment Control Systme at First Floor Slab of cluster 73 Cluster 73 Zone 4B Division 26 3-Dec-2017 4-Dec-2017 9:00 AM 6-Dec-2017 A Approved Closed
Zone 4B, Cluster 73

Installation of PVC conduit for WAP, Telephone and data outlet at


Approved w/
0148 KHEP-LC-0148 first floor slab of cluster 33 Cluster 33 Zone 2B Division 27 4-Dec-2017 5-Dec-2017 8:00 AM 6-Dec-2017 B comments
Closed
Zone 2B, Cluster 33
Installation of PVC conduits and galvanized steel boxes for First Floor
Fire Detection and Alarm System at Roof slab of Cluster 52 Approved w/
0149 KHEP-LC-0149
Zone 3B, Cluster
Cluster 52 Zone 3B Division 28 4-Dec-2017 5-Dec-2017 8:30 AM 9-Dec-2017 B comments
Closed
52
Installation of 6" and 4" PVC sleeves for telecommunication system
at grade beam of Cluster 60 (4" sleeves for water meter IP Approved w/
0150 KHEP-LC-0150
connection 6" for Subduct)
Cluster 60 Zone 3B Division 27 4-Dec-2017 5-Dec-2017 9:00 AM 6-Dec-2017 B comments
Closed
Zone 3B, Cluster 60

Installation of Concrete Encased PVC Conduits for telecommunication


system at Ground Floor of Cluster 14 (2-25mm for KWH and water Approved w/
0151 KHEP-LC-0151
meter IP connection 4" for Subduct)
Cluster 14 Zone 1B Division 28 4-Dec-2017 5-Dec-2017 9:10 AM 7-Dec-2017 B comments
Closed
Zone 1B, Cluster 14

Installation of Concrete Encased PVC Conduits for telecommunication


system at Ground Floor of Cluster 13 (2-25mm for KWH and water Approved w/
0152 KHEP-LC-0152
meter IP connection 4" for Subduct)
Cluster 13 Zone 1B Division 28 4-Dec-2017 5-Dec-2017 9:20 AM 7-Dec-2017 B comments
Closed
Zone 1B, Cluster 13
Installation of Concrete Encased PVC Conduits for telecommunication
system at Ground Floor of Cluster 12 (2-25mm for KWH and water Approved w/
0153 KHEP-LC-0153
meter IP connection 4" for Subduct)
Cluster 12 Zone 1B Division 28 4-Dec-2017 5-Dec-2017 9:30 AM 7-Dec-2017 B comments
Closed
Zone 1B, Cluster 12

Installation of Concrete Encased PVC Conduits for telecommunication


system at Ground Floor of Cluster 11 (2-25mm for KWH and water Approved w/
0154 KHEP-LC-0154
meter IP connection 4" for Subduct)
Cluster 11 Zone 1B Division 28 4-Dec-2017 5-Dec-2017 9:40 AM 7-Dec-2017 B comments
Closed
Zone 1B, Cluster 11

Installation of Concrete Encased PVC Conduits for telecommunication


system at Ground Floor of Cluster 10 (2-25mm for KWH and water Approved w/
0155 KHEP-LC-0155
meter IP connection 4" for Subduct)
Cluster 10 Zone 1B Division 28 4-Dec-2017 5-Dec-2017 9:50 AM 7-Dec-2017 B comments
Closed
Zone 1B, Cluster 10

Installation of Concrete Encased PVC Conduits for telecommunication


system at Ground Floor of Cluster 5 (2-25mm for KWH and water Approved w/
0156 KHEP-LC-0156
meter IP connection 4" for Subduct)
Cluster 5 Zone 1B Division 28 4-Dec-2017 5-Dec-2017 10:00 AM 7-Dec-2017 B comments
Closed
Zone 1B, Cluster 5

Installation of Concrete Encased PVC Conduits for telecommunication


system at Ground Floor of Cluster 7 (2-25mm for KWH and water Approved w/
0157 KHEP-LC-0157
meter IP connection 4" for Subduct)
Cluster 7 Zone 1B Division 28 4-Dec-2017 5-Dec-2017 10:10 AM 7-Dec-2017 B comments
Closed
Zone 1B, Cluster 7

Installation of PVC conduit for WAP, Telephone and data outlet at


Approved w/
0158 KHEP-LC-0158 first floor slab of cluster 73 Cluster 73 Zone 4B Division 27 12-Dec-2017 13-Dec-2017 8:00 AM 13-Dec-2017 B comments
Closed
Zone 4B, Cluster 73

Installation of PVC conduit and Gl boxes for Ground floor Mechanical


Approved w/
0159 KHEP-LC-0159 Equipment Control Systme at First Floor Slab of cluster 52 Cluster 52 Zone 3B Division 26 6-Dec-2017 7-Dec-2017 8:00 AM 9-Dec-2017 B comments
Closed
Zone 3B, Cluster 52

Installation of PVC conduit for WAP, Telephone and data outlet at


Approved w/
0160 KHEP-LC-0160 first floor slab of cluster 52 Cluster 52 Zone 3B Division 26 6-Dec-2017 7-Dec-2017 8:30 AM 7-Dec-2017 B comments
Closed
Zone 3B, Cluster 52

Installation of PVC conduit and Gl boxes for Ground floor Mechanical


Approved w/
0161 KHEP-LC-0161 Equipment Control Systme at First Floor Slab of cluster 9 Cluster 9 Zone 1B Division 26 6-Dec-2017 7-Dec-2017 8:40 AM 9-Dec-2017 B comments
Closed
Zone 1B, Cluster 9

Installation of PVC conduits and galvanized steel boxes for Ground


Floor Fire Detection and Alarm System at First Floor slab of Cluster 9
0162 KHEP-LC-0162
Zone
Cluster 9 Zone 1B Division 26 6-Dec-2017 7-Dec-2017 9:00 AM 11-Dec-2017 E Rejected Closed
1B, Cluster 9
Installation of PVC conduits and galvanized steel boxes for Ground
Floor Fire Detection and Alarm System at First Floor slab of Cluster 9 Approved w/
0162.1 KHEP-LC-0162-01
Zone
Cluster 9 Zone 1B Division 26 13-Dec-2017 14-Dec-2017 9:00 AM 21-Dec-2017 B comments
Closed
1B, Cluster 9
Installation of PVC conduit for Telephone outlet at first floor slab of
Approved w/
0163 KHEP-LC-0163 cluster 9 Zone 1B, Cluster 9 Zone 1B Division 27 12-Dec-2017 13-Dec-2017 8:30 AM 13-Dec-2017 B comments
Closed
Cluster 9
Installation of 6" and 4" PVC sleeves for telecommunication system
at grade beam of Cluster 50 (4" sleeves for water meter IP Approved w/
0164 KHEP-LC-0164
connection 6" for Subduct)
Cluster 50 Zone 3B Division 27 7-Dec-2017 9-Dec-2017 8:00 AM 11-Dec-2017 B comments
Closed
Zone 3B, Cluster 50

Installation of PVC conduit and Gl boxes for Ground floor Mechanical


Approved w/
0165 KHEP-LC-0165 Equipment Control Systme at First Floor Slab of cluster 58 Cluster 58 Zone 3B Division 26 12-Dec-2017 13-Dec-2017 8:00 AM 16-Dec-2017 B comments
Closed
Zone 3B, Cluster 58

Installation of PVC conduit for Ground and First Floor


Approved w/
0166 KHEP-LC-0166 Telecommunication outlet at first floor slab of cluster 58 Cluster 58 Zone 3B Division 27 12-Dec-2017 13-Dec-2017 11:00 AM 18-Dec-2017 B comments
Closed
Zone 3B, Cluster 58
Installation of PVC conduits and galvanized steel boxes for Ground
Floor Fire Detection and Alarm System at First Floor slab of Cluster
0167 KHEP-LC-0167
58
Cluster 58 Zone 3B Division 28 12-Dec-2017 13-Dec-2017 10:00 AM 17-Dec-2017 E Rejected Closed
Zone 3B, Cluster 58
Installation of PVC conduits and galvanized steel boxes for Ground
Floor Fire Detection and Alarm System at First Floor slab of Cluster Approved w/
0167.1 KHEP-LC-0167-01
58
Cluster 58 Zone 3B Division 28 17-Dec-2017 18-Dec-2017 8:00 AM 21-Dec-2017 B comments
Closed
Zone 3B, Cluster 58
Installation of PVC conduit and Gl boxes for First & Roof floor
Mechanical Equipment Control Systme at Roof Slab of cluster 19 Approved w/
0168 KHEP-LC-0168
Zone 1B,
Cluster 19 Zone 1B Division 26 13-Dec-2017 14-Dec-2017 11:00 AM 16-Dec-2017 B comments
Closed
Cluster 19
Installation of PVC conduits and galvanized steel boxes for First Floor
Fire Detection and Alarm System at Roof slab of Cluster 19 Approved w/
0169 KHEP-LC-0169
Zone 1B, Cluster
Cluster 19 Zone 1B Division 28 13-Dec-2017 14-Dec-2017 11:10 AM 17-Dec-2017 B comments
Closed
9
Installation of PVC conduit and Gl boxes for First & Roof floor
Mechanical Equipment Control Systme at Roof Slab of cluster 75 Approved w/
0170 KHEP-LC-0170
Zone 4B,
Cluster 75 Zone 4B Division 26 16-Dec-2017 17-Dec-2017 8:30 AM 18-Dec-2017 B comments
Closed
Cluster 75
Installation of PVC conduits and galvanized steel boxes for Ground
Floor Fire Detection and Alarm System at Roof slab of Cluster 75 Approved w/
0171 KHEP-LC-0171
Zone 4B,
Cluster 75 Zone 4B Division 28 16-Dec-2017 17-Dec-2017 8:00 AM 17-Dec-2017 B comments
Closed
Cluster 75
Installation of 6" and 4" PVC sleeves for telecommunication system
at grade beam of Cluster 22 (4" sleeves for water meter IP Approved w/
0172 KHEP-LC-0172
connection 6" for Subduct)
Cluster 22 Zone 1B Division 27 16-Dec-2017 17-Dec-2017 9:00 AM 18-Dec-2017 B comments
Closed
Zone 1B, Cluster 22

Installation of PVC conduits and galvanized steel boxes for first Floor
Approved w/
0173 KHEP-LC-0173 Fire Detection and Alarm System at Roof slab of Cluster 61 Cluster 61 Zone 3B Division 28 17-Dec-2017 18-Dec-2017 8:00 AM 21-Dec-2017 B comments
Closed
Zone 3B, Cluster 61

Installation of PVC conduit and Gl boxes for first floor & roof floor
Mechanical Equipment Control Systme at roof Slab of cluster 61 Approved w/
0174 KHEP-LC-0174
Zone 3B, Cluster
Cluster 61 Zone 3B Division 26 17-Dec-2017 18-Dec-2017 8:30 AM 19-Dec-2017 B comments
Closed
61
Installation of PVC conduit and Gl boxes for first floor
Approved w/
0175 KHEP-LC-0175 telecommunication outlet at cluster 69 Cluster 69 Zone 4B Division 26 18-Dec-2017 19-Dec-2017 8:30 AM 20-Dec-2017 B comments
Closed
Zone 4B, Cluster 69
Installation of PVC conduit and Gl boxes for first floor & roof floor
Approved w/
0176 KHEP-LC-0176 Mechanical Equipment Control Systme at roof Slab of Zone 1B, Cluster 20 Zone 1B Division 26 21-Dec-2017 23-Dec-2017 8:00 AM 25-Dec-2017 B comments
Closed
Cluster 20
Installation of PVC conduits and Galvanized steel boxes for First Floor
Approved w/
0177 KHEP-LC-0177 Fire Detection and Alarm System atRoof Slab of Cluster 20 Zone 1B, Cluster 20 Zone 1B Division 28 21-Dec-2017 23-Dec-2017 8:30 AM 25-Dec-2017 B comments
Closed
Cluster 20
Installation of PVC conduits and Galvanized steel boxes for First Floor
Approved w/
0178 KHEP-LC-0178 Fire Detection and Alarm System at Roof Slab of Cluster 3 Zone 1A, Cluster 3 Zone 1A Division 28 23-Dec-2017 24-Dec-2017 8:00 AM 25-Dec-2017 B comments
Closed
Cluster 3

Installation of PVC conduits and GI boxes for Ground Floor


0179 KHEP-LC-0179
Telecomunication Outlet at Cluster 69 Unit B Zone 4B Cluster 69
Cluster 69 Zone 4B Division 26 24-Dec-2017 25-Dec-2017 8:00 AM 27-Dec-2017 A Approved Closed

Installation of PVC conduits and GI boxes for First & Roof Floor
0180 KHEP-LC-0180 Mechanical Equipment Control System at Roof Slab Of Cluster 3 Zone Cluster 3 Zone 1A Division 26 24-Dec-2017 25-Dec-2017 8:40 AM 27-Dec-2017 E Rejected Closed
1A Cluster 3
Installation of PVC conduits and GI boxes for First & Roof Floor
Approved w/
0180.1 KHEP-LC-0180-01 Mechanical Equipment Control System at Roof Slab Of Cluster 3 Zone Cluster 3 Zone 1A Division 26 27-Dec-2017 28-Dec-2017 8:30 AM 30-Dec-2017 B comments
Closed
1A
Installation of EMT conduits and GI boxes for First Thermostat at Approved w/
0181 KHEP-LC-0181
Cluster 69 Unit B Zone 4B
Cluster 69 Zone 4B Division 26 25-Dec-2017 26-Dec-2017 8:00 AM 28-Dec-2017 B comments
Closed

Installation of PVC conduits for Ground & First Floor Approved w/


0182 KHEP-LC-0182
Telecomunication Outlet at First Floor Slab at Cluster 34 Zone 2B
Cluster 34 Zone 2B Division 27 26-Dec-2017 27-Dec-2017 8:00 AM 28-Dec-2017 B comments
Closed

Installation of PVC conduits and GI boxes for Ground Floor


Approved w/
0183 KHEP-LC-0183 Mechanical Equipment Control System at First Floor Slab of Cluster Cluster 34 Zone 2B Division 27 26-Dec-2017 27-Dec-2017 8:30 AM 28-Dec-2017 B comments
Closed
34 Zone 2B

Installation of PVC conduits and GI boxes for Ground Floor Fire Alarm Approved w/
0184 KHEP-LC-0184
& Detection System at First Floor Slab of Cluster 34 Zone 2B
Cluster 34 Zone 2B Division 26 27-Dec-2017 28-Dec-2017 8:00 AM 30-Dec-2017 B comments
Closed
Installation of PVC conduits and galvanized steel boxes for First Floor
Fire Detection and Alarm System at Roof slab of Cluster 48 Approved w/
0185 KHEP-LC-0185
Zone 3B, Cluster
Cluster 48 Zone 3B Division 28 28-Dec-2017 30-Dec-2017 8:00 AM 1-Jan-2018 B comments
Closed
48
Installation of PVC conduits and GI boxes for First Floor & Roof Floor
Approved w/
0186 KHEP-LC-0186 Mechanical Equipment Control System at Roof Slab of Cluster 48 Cluster 48 Zone 3B Division 26 28-Dec-2017 30-Dec-2017 8:30 AM 2-Jan-2018 B comments
Closed
Zone 3B

Installation of 6 inch & 4 inch PVC Sleeves for Telecomminication


Approved w/
0187 KHEP-LC-0187 system at Grade Beam of Cluster 24 4" for Water Meter IP Cluster 24 Zone 2B Division 27 30-Dec-2017 31-Dec-2017 8:00 AM 2-Jan-2018 B comments
Closed
Connection & 6" for Subduct Cluster 24 Zone 2B

Installation of 6 inch & 4 inch PVC Sleeves for Telecomminication


Approved w/
0188 KHEP-LC-0188 system at Grade Beam of Cluster 37 4" for Water Meter IP Cluster 37 Zone 2B Division 27 30-Dec-2017 31-Dec-2017 8:30 AM 2-Jan-2018 B comments
Closed
Connection & 6" for Subduct Cluster 37 Zone 2B

Installation of PVC conduits for Ground & First Floor Approved w/


0189 KHEP-LC-0189
Telecomunication Outlet at First Floor Slab at Cluster 35 Zone 2B
Cluster 35 Zone 2B Division 27 30-Dec-2017 31-Dec-2017 2:00 PM 2-Jan-2018 B comments
Closed

Installation of PVC conduits and GI boxes for Ground Floor


Approved w/
0190 KHEP-LC-0190 Mechanical Equipment Control System at First Floor Slab of Cluster Cluster 35 Zone 2B Division 26 30-Dec-2017 31-Dec-2017 10:30 AM 1-Jan-2018 B comments
Closed
35 Zone 2B

Installation of PVC conduits & GI boxes for Ground Floor Fire Alarm
Approved w/
0191 KHEP-LC-0191 & Detection System at First Floor slab of Cluster 35 Cluster 35 Zone 2B Division 26 30-Dec-2017 31-Dec-2017 11:00 AM 1-Jan-2018 B comments
Closed
Zone 2B, Cluster 35

Installation of PVC conduits for Ground & First Floor Approved w/


0192 KHEP-LC-0192
Telecomunication Outlet at First Floor Slab at Cluster 81 Zone 4A
Cluster 81 Zone 4A Division 27 30-Dec-2017 31-Dec-2017 9:30 AM 2-Jan-2018 B comments
Closed

Installation of PVC conduits and GI boxes for Ground Floor


Approved w/
0193 KHEP-LC-0193 Mechanical Equipment Control System at First Floor Slab of Cluster Cluster 81 Zone 4A Division 26 30-Dec-2017 31-Dec-2017 9:45 AM 1-Jan-2018 B comments
Closed
81 Zone 4A
Installation of PVC conduits & GI boxes for Ground Floor Fire Alarm
0194 KHEP-LC-0194 & Detection System at First Floor slab of Cluster 81 Zone 4A, Cluster Cluster 81 Zone 4A Division 26 30-Dec-2017 31-Dec-2017 10:00 AM 1-Jan-2018 E Rejected Closed
81
Installation of PVC conduits & GI boxes for Ground Floor Fire Alarm
Approved w/
0194.1 KHEP-LC-0194-01 & Detection System at First Floor slab of Cluster 81 Zone 4A, Cluster Cluster 81 Zone 4A Division 26 3-Jan-2018 4-Jan-2018 8:00 AM 9-Jan-2018 B comments
Closed
81

Installation of 6 Inch & 4 Inch PVC Sleeves for Telecommunication


Approved w/
0195 KHEP-LC-0195 System at Grade Beam of Cluster 25 4" Water Meter IP Connection & Cluster 25 Zone 2B Division 27 1-Jan-2018 2-Jan-2018 8:00 AM 7-Jan-2018 B comments
Closed
6" for Subduct Zone 2B Cluster 25

Installation of 6 Inch & 4 Inch PVC Sleeves for Telecommunication


Approved w/
0196 KHEP-LC-0196 System at Grade Beam of Cluster 55 4" Water Meter IP Connection & Cluster 55 Zone 2B Division 27 1-Jan-2018 2-Jan-2018 8:30 AM 6-Jan-2018 B comments
Closed
6" for Subduct Zone 2B Cluster 55

Installation of GI boxes & EMT Conduit for Mechanical Equipment Approved w/


0197 KHEP-LC-0197
Control System Routed at first Floor celing of Cluster 69 Zone 4B
Cluster 69 Zone 4B Division 27 1-Jan-2018 2-Jan-2018 9:00 AM 3-Jan-2018 B comments
Closed

Installation of 6 Inch & 4 Inch PVC Sleeves for Telecommunication


Approved w/
0198 KHEP-LC-0198 System at Grade Beam of Cluster 36 4" Water Meter IP Connection & Cluster 36 Zone 2B Division 27 6-Jan-2018 7-Jan-2018 8:00 AM 8-Jan-2018 B comments
Closed
6" for Subduct Zone 2B Cluster 36

Installation of EMT conduits and GI boxes for Ground Floor Approved w/


0199 KHEP-LC-0199
Termostat at Cluster 69 Unit B Zone 4B
Cluster 69 Zone 4B Division 26 6-Jan-2018 7-Jan-2018 8:30 AM 8-Jan-2018 B comments
Closed

Installation of PVC conduits for Ground & First Floor Approved w/


0200 KHEP-LC-0200
Telecommunication outlets at first floor Slab of Cluster 72 Zone 4B
Cluster 72 Zone 4B Division 27 7-Jan-2018 8-Jan-2018 8:00 AM 9-Jan-2018 B comments
Closed

Installation of PVC conduits and GI boxes for Ground Floor


Approved w/
0201 KHEP-LC-0201 Mechanical Equipment Control System at First Floor Slab of Cluster Cluster 72 Zone 4B Division 26 7-Jan-2018 8-Jan-2018 8:30 AM 9-Jan-2018 B comments
Closed
72 Zone 4B

Installation of PVC Conduits & GI Boxes for Ground Floor Fire Alarm Approved w/
0202 KHEP-LC-0202
& Detection System at First Floor Slab of Cluster 72 Zone 4B
Cluster 72 Zone 4B Division 26 7-Jan-2018 8-Jan-2018 9:00 AM 9-Jan-2018 B comments
Closed

Installation of PVC Conduits & Galvanized Steel Boxes for First Floor
Approved w/
0203 KHEP-LC-0203 Fire Detection & Fire Alarm System at Roof Slab of Cluster 51 Zone Cluster 51 Zone 3B Division 28 7-Jan-2018 8-Jan-2018 9:30 AM 9-Jan-2018 B comments
Closed
3B
Installation of PVC conduits and GI boxes for First Floor & Roof Floor
Approved w/
0204 KHEP-LC-0204 Mechanical Equipment Control System at Roof Slab of Cluster 51 Cluster 51 Zone 3B Division 26 7-Jan-2018 8-Jan-2018 10:00 AM 9-Jan-2018 B comments
Closed
Zone 3B
Installation of EMT conduit & GI boxes for ground floor telecom
Approved w/
0205 KHEP-LC-0205 outlet at Cluster 69 Zone 4B Unit B for maid's rooms flexroom flex Cluster 69 Zone 4B Division 26 7-Jan-2018 8-Jan-2018 8:00 AM 13-Jan-2018 B comments
Closed
room & living room outlet only

Installation of PVC conduits & galvanized steel boxes for first floor Approved w/
0206 KHEP-LC-0206
fire detection & alarm system at roof slab of Cluster 27 Zone 2B
Cluster 27 Zone 2B Division 28 9-Jan-2018 10-Jan-2018 8:00 AM 13-Jan-2018 B comments
Closed

Installation of PVC conduits & GI boxes for first & roof floor
Approved w/
0207 KHEP-LC-0207 mechanical equipment control system at roof slab of Cluster 27 Zone Cluster 27 Zone 2B Division 26 9-Jan-2018 10-Jan-2018 8:30 AM 11-Jan-2018 B comments
Closed
2B

Installation of PVC conduits & GI boxes for ground floor fire alarm & Approved w/
0208 KHEP-LC-0208
detection system at first floor slab of Cluster 21 Zone 1B
Cluster 21 Zone 1B Division 26 9-Jan-2018 10-Jan-2018 9:00 AM 13-Jan-2018 B comments
Closed

Installation of PVC conduits & galvanized steel boxes for first floor Approved w/
0209 KHEP-LC-0209
fire detection & alarm system at roof slab of Cluster 52 Zone 3B
Cluster 52 Zone 3B Division 28 10-Jan-2018 11-Jan-2018 8:00 AM 16-Jan-2018 B comments
Closed

Installation of PVC conduits & GI boxes for first & roof floor
Approved w/
0210 KHEP-LC-0210 mechanical equipment control system at roof slab of Cluster 52 Zone Cluster 52 Zone 3B Division 26 10-Jan-2018 11-Jan-2018 8:20 AM 13-Jan-2018 B comments
Closed
3B

Installation of PVC conduits for Ground & First Floor Approved w/


0211 KHEP-LC-0211
Telecommunication outlets at first floor Slab of Cluster 54 Zone 3B
Cluster 54 Zone 3B Division 27 10-Jan-2018 11-Jan-2018 8:40 AM 13-Jan-2018 B comments
Closed

Installation of PVC conduits & GI boxes for Ground floor mechanical Approved w/
0212 KHEP-LC-0212
equipment control system at First Floor slab of Cluster 54 Zone 3B
Cluster 54 Zone 3B Division 26 10-Jan-2018 11-Jan-2018 9:00 AM 13-Jan-2018 B comments
Closed

Installation of PVC Conduits & GI Boxes for Ground Floor Fire Alarm Approved w/
0213 KHEP-LC-0213
& Detection System at First Floor Slab of Cluster 54 Zone 3B
Cluster 54 Zone 3B Division 26 10-Jan-2018 11-Jan-2018 9:20 AM 16-Jan-2018 B comments
Closed

Installation of PVC Conduits & GI Boxes for Ground Floor Fire Alarm Approved w/
0214 KHEP-LC-0214
& Detection System at First Floor Slab of Cluster 30 Zone 3B
Cluster 30 Zone 3B Division 26 10-Jan-2018 11-Jan-2018 9:40 AM 16-Jan-2018 B comments
Closed

Installation of PVC Conduits for ground & first Floor Approved w/


0215 KHEP-LC-0215
Telecommunication outlets at first floor slab of Cluster 30 Zone 2B
Cluster 30 Zone 2B Division 27 11-Jan-2018 13-Jan-2018 8:00 AM 14-Jan-2018 B comments
Closed

Installation of PVC Conduits & GI Boxes for Ground Floor mechanical Approved w/
0216 KHEP-LC-0216
equipment control system at first floor slab of Cluster 30 Zone 2B
Cluster 30 Zone 2B Division 26 11-Jan-2018 13-Jan-2018 8:30 AM 14-Jan-2018 B comments
Closed

Installation of EMT Conduits & GI boxes for ground & first floor fire
0217 KHEP-LC-0217
alarm & detection system at Cluster 69 Zone 4B
Cluster 69 Zone 4B Division 26 11-Jan-2018 13-Jan-2018 9:00 AM 16-Jan-2018 E Rejected Closed

Installation of EMT Conduits & GI boxes for ground & first floor fire
0217.1 KHEP-LC-0217-01
alarm & detection system at Cluster 69 Zone 4B
Cluster 69 Zone 4B Division 26 20-Jan-2018 21-Jan-2018 8:30 AM 23-Jan-2018 E Rejected Closed

Installation of PVC Conduits & GI Boxes for Ground Floor mechanical Approved w/
0218 KHEP-LC-0218
equipment control system at first floor slab of Cluster 21 Zone 1B
Cluster 21 Zone 1B Division 26 14-Jan-2018 15-Jan-2018 8:00 AM 16-Jan-2018 B comments
Closed

Installation of PVC Conduits & GI Boxes for first & roof floor
Approved w/
0219 KHEP-LC-0219 mechanical equipment control system at roof slab of Cluster 16 Zone Cluster 16 Zone 1B Division 26 14-Jan-2018 15-Jan-2018 8:30 AM 16-Jan-2018 B comments
Closed
1B

Installation of PVC conduits & galvanized steel boxes for first floor Approved w/
0220 KHEP-LC-0220
fire Detection & Alarm System at roof slab of Cluster 16 Zone 1B
Cluster 16 Zone 1B Division 26 14-Jan-2018 15-Jan-2018 9:00 AM 20-Jan-2018 B comments
Closed

Installation of PVC conduits for ground & first floor Approved w/


0221 KHEP-LC-0221
telecommunication outlets at first slab of Cluster 21 Zone 1B
Cluster 21 Zone 1B Division 27 15-Jan-2018 16-Jan-2018 8:00 AM 20-Jan-2018 B comments
Closed

Installation of 450x 500x 100x mm Pull box for telecommunication


0222 KHEP-LC-0222
outlets at first floor of Cluster 69 unit B Zone 4B
Cluster 69 Zone 4B Division 27 15-Jan-2018 16-Jan-2018 8:30 AM 22-Jan-2018 E Rejected Closed

Installation of PVC conduits & galvanized steel boxes for first floor Approved w/
0223 KHEP-LC-0223
fire Detection & Alarm System at roof slab of Cluster 71 Zone 4B
Cluster 71 Zone 4B Division 28 16-Jan-2018 16-Jan-2018 8:00 AM 20-Jan-2018 B comments
Closed

Installation of PVC conduits & GI boxes for First & Roof Floor
Approved w/
0224 KHEP-LC-0224 Mechanical Equipment Control system at Roof Slab of Cluster 71 Cluster 71 Zone 4B Division 28 16-Jan-2018 16-Jan-2018 8:20 AM 20-Jan-2018 B comments
Closed
Zone 4B
Installation of 6 inch & 4 inch PVC sleeved for Telecommunication
0225 KHEP-LC-0225 system at grade beam of Cluster 46 4" for water meter IP Cluster 4 Zone 3A Division 27 18-Jan-2018 20-Jan-2018 8:00 AM 22-Jan-2018 A Approved Closed
Connection & 6 for subduct Zone 3A
Inspection of 2C16 AWG cable for SLC loop & AWG cable for power
0226 KHEP-LC-0226 supply for ground & first floor fire detection & alarm system at Cluster 69 Zone 4B Division 28 20-Jan-2018 21-Jan-2018 8:00 AM 23-Jan-2018 E Rejected Closed
Cluster 69 Unit B Zone 4B Cluster 69
Installation of 6 inch & 4 inch PVC sleeved for Telecommunication
Approved w/
0227 KHEP-LC-0227 system at grade beam of Cluster 42 4" for water meter IP Cluster 42 Zone 2B Division 27 21-Jan-2018 22-Jan-2018 8:00 AM 24-Jan-2018 B comments
Closed
Connection & 6 for subduct Zone 2B
Installation of CAT 6A cable telecommunication system at ground & Approved w/
0228 KHEP-LC-0228
first floor of Cluster 69 unit B Zone 4B
Cluster 69 Zone 4B Division 28 21-Jan-2018 22-Jan-2018 8:30 AM 25-Jan-2018 B comments
Closed

Installation of PVC conduits & GI boxes for ground floor Fire Alarm & Approved w/
0229 KHEP-LC-0229
Detection system at first floor slab of Cluster 18 Zone 1B
Cluster 18 Zone 1B Division 28 22-Jan-2018 23-Jan-2018 8:30 AM 24-Jan-2018 B comments
Closed

Installation of PVC conduits & GI boxes for Ground floor mechanical


0230 KHEP-LC-0230
equipment control system at First Floor slab of Cluster 18 Zone 1B
Cluster 18 Zone 1B Division 28 22-Jan-2018 23-Jan-2018 8:30 AM 24-Jan-2018 E Rejected Closed

Installation of PVC conduits & GI boxes for Ground floor mechanical Approved w/
0230.1 KHEP-LC-0230-01
equipment control system at First Floor slab of Cluster 18 Zone 1B
Cluster 18 Zone 1B Division 28 28-Jan-2018 29-Jan-2018 8:00 AM 31-Jan-2018 B comments
Closed

Installation of PVC conduits & GI boxes for ground floor Fire Alarm & Approved w/
0231 KHEP-LC-0231
Detection system at first floor slab of Cluster 66 Zone 4A
Cluster 66 Zone 4A Division 28 22-Jan-2018 23-Jan-2018 9:00 AM 24-Jan-2018 B comments
Closed

Installation of PVC conduits & GI boxes for Ground floor mechanical Approved w/
0232 KHEP-LC-0232
equipment control system at First Floor slab of Cluster 66 Zone 4A
Cluster 66 Zone 4A Division 28 22-Jan-2018 23-Jan-2018 9:30 AM 24-Jan-2018 B comments
Closed

Installation of PVC Conduits for ground & first Floor Approved w/


0233 KHEP-LC-0233
Telecommunication outlets at first floor slab of Cluster 18 Zone 1B
Cluster 18 Zone 1B Division 27 22-Jan-2018 23-Jan-2018 9:45 AM 24-Jan-2018 B comments
Closed

Installation of PVC Conduits for ground & first Floor Approved w/


0234 KHEP-LC-0234
Telecommunication outlets at first floor slab of Cluster 66 Zone 4A
Cluster 66 Zone 4A Division 27 23-Jan-2018 24-Jan-2018 8:00 AM 28-Jan-2018 B comments
Closed

Installation of 6 inch & 4 inch PVC sleeved for Telecommunication


Approved w/
0235 KHEP-LC-0235 system at grade beam of Cluster 41 4" for water meter IP Cluster 41 Zone 2B Division 27 23-Jan-2018 24-Jan-2018 8:30 AM 25-Jan-2018 B comments
Closed
Connection & 6 for subduct Zone 2B

Installation of PVC conduits & Galvanized steel boxes for first floor Approved w/
0236 KHEP-LC-0236
Fire Ditection & Alarm System at roof slab of Cluster 6 Zone 1B
Cluster 6 Zone 1B Division 28 24-Jan-2018 25-Jan-2018 8:00 AM 29-Jan-2018 B comments
Closed

Installation of PVC conduits & GI boxes for Ground floor mechanical


0237 KHEP-LC-0237 Cluster 23 Zone 1B Division 26 24-Jan-2018 25-Jan-2018 8:30 AM RECALLED
equipment control system at First Floor slab of Cluster 23 Zone 1B

Installation of PVC conduits & GI boxes for Ground floor Fire Alarm & Approved w/
0238 KHEP-LC-0238
Ditection System at first floor slab of Cluster 23 Zone 1B
Cluster 23 Zone 1B Division 28 24-Jan-2018 25-Jan-2018 9:00 AM 29-Jan-2018 B comments
Closed

Installation of PVC conduits & Galvanized steel boxes for first floor Approved w/
0239 KHEP-LC-0239
Fire Ditection & Alarm System at first floor slab of Cluster 60 Zone 3B
Cluster 60 Zone 3B Division 28 25-Jan-2018 27-Jan-2018 8:30 AM 29-Jan-2018 B comments
Closed

Installation of 6 inch & 4 inch PVC sleeved for Telecommunication


Approved w/
0240 KHEP-LC-0240 system at grade beam of Cluster 26 4" for water meter IP Cluster 26 Zone 2B Division 27 27-Jan-2018 28-Jan-2018 8:00 AM 29-Jan-2018 B comments
Closed
Connection & 6 for subduct Zone 2B

Installation of PVC conduits & GI boxes for Ground floor mechanical Approved w/
0241 KHEP-LC-0241
equipment control system at First Floor slab of Cluster 44 Zone 2A
Cluster 44 Zone 2A Division 26 27-Jan-2018 28-Jan-2018 8:30 AM 29-Jan-2018 B comments
Closed

Installation of PVC conduits & Galvanized steel boxes for first floor Approved w/
0242 KHEP-LC-0242
Fire Ditection & Alarm System at first floor slab of Cluster 44 Zone 2A
Cluster 44 Zone 2A Division 28 27-Jan-2018 28-Jan-2018 9:00 AM 29-Jan-2018 B comments
Closed

Installation of PVC Conduits for ground & first Floor Approved w/


0243 KHEP-LC-0243
Telecommunication outlets at first floor slab of Cluster 23 Zone 1B
Cluster 23 Zone 1B Division 27 27-Jan-2018 28-Jan-2018 2:00 PM 29-Jan-2018 B comments
Closed

Installation of PVC conduits & GI boxes for Ground floor mechanical Approved w/
0244 KHEP-LC-0244
equipment control system at First Floor slab of Cluster 23 Zone 1B
Cluster 23 Zone 1B Division 26 28-Jan-2018 29-Jan-2018 8:20 AM 31-Jan-2018 B comments
Closed

Installation of PVC conduits & GI boxes for Ground floor mechanical Approved w/
0245 KHEP-LC-0245
equipment control system at First Floor slab of Cluster 60 Zone 3B
Cluster 60 Zone 3B Division 26 28-Jan-2018 29-Jan-2018 8:40 AM 31-Jan-2018 B comments
Closed

Installation of PVC conduits & GI boxes for Ground floor mechanical


0246 KHEP-LC-0246
equipment control system at roof slab of Cluster 6 Zone 1B
Cluster 6 Zone 1B Division 26 28-Jan-2018 29-Jan-2018 9:00 AM 31-Jan-2018 E Rejected Closed
Installation of PVC conduits & GI boxes for Ground floor mechanical Approved w/
0246.1 KHEP-LC-0246-01
equipment control system at roof slab of Cluster 6 Zone 1B
Cluster 6 Zone 1B Division 26 1-Feb-2018 3-Feb-2018 1:00 PM 6-Feb-2018 B comments
Closed

Installation of PVC Conduits for ground & first Floor Approved w/


0247 KHEP-LC-0247
Telecommunication outlets at first floor slab of Cluster 44 Zone 2A
Cluster 44 Zone 2A Division 27 28-Jan-2018 29-Jan-2018 2:00 PM 30-Jan-2018 B comments
Closed

Installation of 6 inch & 4 inch PVC sleeved for Telecommunication


Approved w/
0248 KHEP-LC-0248 system at grade beam of Cluster 45 4" for water meter IP Cluster 45 Zone 3A Division 27 29-Jan-2018 30-Jan-2018 8:00 AM 31-Jan-2018 B comments
Closed
Connection & 6 for subduct Zone 3A

Installation of PVC Conduits for ground & first Floor Approved w/


0249 KHEP-LC-0249
Telecommunication outlets at first floor slab of Cluster 60 Zone 3B
Cluster 60 Zone 3B Division 27 29-Jan-2018 30-Jan-2018 8:30 AM 31-Jan-2018 B comments
Closed

Installation of PVC conduits & Galvanized steel boxes for first floor Approved w/
0250 KHEP-LC-0250
Fire Ditection & Alarm System at roof slab of Cluster 4 Zone 2A
Cluster 4 Zone 2A Division 28 30-Jan-2018 31-Jan-2018 8:00 AM 31-Jan-2018 B comments
Closed

Installation of PVC conduits & GI boxes for first & roof floor
Approved w/
0251 KHEP-LC-0251 mechanical equipment control system at roof slab of Cluster 4 Zone Cluster 4 Zone 1A Division 26 31-Jan-2018 1-Feb-2018 8:00 AM 1-Feb-2018 B comments
Closed
1A

Installation of PVC conduits & galvanized steel boxes for first floor
0252 KHEP-LC-0252
Fire Detection & Alarm System at roof slab Cluster 73 Zone 4B
Cluster 73 Zone 4B Division 28 1-Feb-2018 3-Feb-2018 8:00 AM 4-Feb-2018 E Rejected Closed

Installation of PVC conduits & GI boxes for Fire Alarm & Detection Approved w/
0252.1 KHEP-LC-0252-01
System for first floor at roof floor slab Cluster 63 Zone 3B
Cluster 63 Zone 3B Division 26 6-Feb-2018 7-Feb-2018 8:00 AM 7-Feb-2018 B comments
Closed

Installation of PVC conduits & GI boxes for first & roof floor
Approved w/
0253 KHEP-LC-0253 mechanical equipment control system at roof slab of Cluster 73 Zone Cluster 73 Zone 4B Division 28 1-Feb-2018 3-Feb-2018 8:30 AM 6-Feb-2018 B comments
Closed
4B

Installation of PVC conduits & GI boxes for ground floor mechanical Approved w/
0254 KHEP-LC-0254
equipment control system at first floor slab of Cluster 63 Zone 3B
Cluster 63 Zone 3B Division 26 1-Feb-2018 3-Feb-2018 9:00 AM 6-Feb-2018 B comments
Closed

Installation of PVC conduits & GI boxes for ground floor Fire Alarm &
0255 KHEP-LC-0255
Detection System at First Floor Slab Cluster 63 Zone 3B
Cluster 63 Zone 3B Division 26 1-Feb-2018 3-Feb-2018 9:00 AM 4-Feb-2018 E Rejected Closed

Installation of PVC conduits & GI boxes for ground floor Fire Alarm & Approved w/
0255.1 KHEP-LC-0255-01
Detection System at First Floor Slab Cluster 63 Zone 4B
Cluster 63 Zone 4B Division 26 6-Feb-2018 7-Feb-2018 8:20 AM 7-Feb-2018 B comments
Closed

Installation of PVC Conduits for ground & first Floor Approved w/


0256 KHEP-LC-0256
Telecommunication outlets at first floor slab of Cluster 63 Zone 3B
Cluster 63 Zone 3B Division 26 3-Feb-2018 4-Feb-2018 8:00 AM 5-Feb-2018 B comments
Closed

Installation of 32mm PVC Conduit for connected to busbars &


0257 KHEP-LC-0257
telecom cabinet at ground floor Cluster 17 Zone 1B
Cluster 17 Zone 1B Division 26 5-Feb-2018 6-Feb-2018 9:20 AM 10-Feb-2018 E Rejected Closed

Installation of PVC conduits & box for Fire Alarm system fopr first Approved w/
0258 KHEP-LC-0258
floor at roof slab in Cluster 33 Zone 2B
Cluster 33 Zone 2B Division 26 6-Feb-2018 7-Feb-2018 9:20 AM 7-Feb-2018 B comments
Closed

Installation of 110mm PVC conduits for telecom cabinet for ground


0259 KHEP-LC-0259
floor slab in Cluster 17 Zone 1B
Cluster 17 Zone 1B Division 26 7-Feb-2018 8-Feb-2018 8:10 AM 13-Feb-2018 E Rejected Closed

Installation of PVC conduits & box for Mechanical control system for Approved w/
0260 KHEP-LC-0260
first floor at roof slab in Cluster 33 Zone 2B
Cluster 33 Zone 2B Division 26 7-Feb-2018 8-Feb-2018 9:10 AM 10-Feb-2018 B comments
Closed

Installation of PVC conduits & box for Mechanical control system for Approved w/
0261 KHEP-LC-0261
roof floor at roof slab in Cluster 33 Zone 2B
Cluster 33 Zone 2B Division 26 7-Feb-2018 8-Feb-2018 9:20 AM 10-Feb-2018 B comments
Closed

Installation of PVC conduits & box for HVAC system temperature Approved w/
0262 KHEP-LC-0262
control for ground floor at first floor slab in Cluster 43 Zone 2A
Cluster 43 Zone 2A Division 26 10-Feb-2018 11-Feb-2018 1:40 PM 13-Feb-2018 B comments
Closed

Installation pf PVC conduits & box for fire alarm system for ground
0263 KHEP-LC-0263
floor at first floor slab in Cluster 43 Zone 2A
Cluster 43 Zone 2A Division 26 13-Feb-2018 14-Feb-2018 8:00 AM 17-Feb-2018 A Approved Closed

Installation of PVC conduits & box for telephone & data system for Approved w/
0264 KHEP-LC-0264
first floor at first floor slab in Cluster 43 Zone 2A
Cluster 43 Zone 2A Division 26 10-Feb-2018 11-Feb-2018 1:40 PM 13-Feb-2018 B comments
Closed

Installation of PVC conduits & box for telephone & data system for Approved w/
0265 KHEP-LC-0265
ground floor at first floor slab in Cluster 43 Zone 2A
Cluster 43 Zone 2A Division 26 10-Feb-2018 11-Feb-2018 2:45 PM 13-Feb-2018 B comments
Closed

Installation of PVC conduits for HVAC system temperature control for


0266 KHEP-LC-0266
first floor at roof slab in Cluster 21 Zone 1B
Cluster 21 Zone 1B Division 26 11-Feb-2018 12-Feb-2018 2:50 PM 13-Feb-2018 E Rejected Closed

Installation of PVC conduits for HVAC system temperature control for Approved w/
0266.1 KHEP-LC-0266-01
first floor at roof slab in Cluster 21 Zone 1B
Cluster 21 Zone 1B Division 26 15-Feb-2018 17-Feb-2018 8:00 AM 19-Feb-2018 B comments
Closed

Installation of PVC conduits & box for telephone & data system for Approved w/
0267 KHEP-LC-0267
ground floor at first floor slab in Cluster 22 Zone 1B
Cluster 22 Zone 1B Division 26 11-Feb-2018 12-Feb-2018 9:45 AM 13-Feb-2018 B comments
Closed
Installation pf PVC conduits & box for fire alarm system for ground Approved w/
0268 KHEP-LC-0268
floor at first floor slab in Cluster 22 Zone 1B
Cluster 22 Zone 1B Division 26 11-Feb-2018 12-Feb-2018 10:00 AM 13-Feb-2018 B comments
Closed

Installation of PVC conduits for HVAC system temperature control for


0269 KHEP-LC-0269
ground floor at first floor slab in Cluster 22 Zone 1B
Cluster 22 Zone 1B Division 26 11-Feb-2018 12-Feb-2018 10:15 AM 13-Feb-2018 E Rejected Closed

Installation of PVC conduits for HVAC system temperature control for Approved w/
0269.1 KHEP-LC-0269-01
ground floor at first floor slab in Cluster 22 Zone 1B
Cluster 22 Zone 1B Division 26 15-Feb-2018 17-Feb-2018 9:00 AM 19-Feb-2018 B comments
Closed

Installation pf PVC conduits & box for fire alarm system for first floor Approved w/
0270 KHEP-LC-0270
at roof floor slab in Cluster 21 Zone 1B
Cluster 21 Zone 1B Division 26 11-Feb-2018 12-Feb-2018 1:15 PM 13-Feb-2018 B comments
Closed

Installation of PVC conduits for HVAC system communication cable


0271 KHEP-LC-0271
for roof floor at roof slab in Cluster 21 Zone 1B
Cluster 21 Zone 1B Division 26 11-Feb-2018 12-Feb-2018 2:15 PM 13-Feb-2018 E Rejected Closed

Installation of PVC conduits for HVAC system communication cable Approved w/


0271.1 KHEP-LC-0271-01
for roof floor at roof slab in Cluster 21 Zone 1B
Cluster 21 Zone 1B Division 26 15-Feb-2018 17-Feb-2018 8:30 AM 19-Feb-2018 B comments
Closed

Installation of PVC conduits for HVAC system temperature control for Approved w/
0272 KHEP-LC-0272
ground floor at first floor slab in Cluster 24 Zone 2B
Cluster 24 Zone 2B Division 26 12-Feb-2018 13-Feb-2018 8:20 AM 14-Feb-2018 B comments
Closed

Installation of PVC conduits for telephone & data system for ground Approved w/
0273 KHEP-LC-0273
floor at first floor slab in Cluster 24 Zone 2B
Cluster 24 Zone 2B Division 26 12-Feb-2018 13-Feb-2018 8:00 AM 20-Feb-2018 B comments
Closed

Installation of PVC conduits for fire alarm system for ground floor at Approved w/
0274 KHEP-LC-0274
first floor slab in Cluster 24 Zone 2B
Cluster 24 Zone 2B Division 26 12-Feb-2018 13-Feb-2018 8:10 AM 13-Feb-2018 B comments
Closed

Installation of PVC conduits & GI boxes for ground floor fire alarm &
0275 KHEP-LC-0275
detection system at forst floor slab of Cluster 50 Zone 3B
Cluster 50 Zone 3B Division 26 13-Feb-2018 14-Feb-2018 8:00 AM 17-Feb-2018 A Approved Closed

Installation of PVC conduits & GI boxes for ground floor mechanical Approved w/
0276 KHEP-LC-0276
equipment control system at first floor slab of Cluster 50 Zone 3B
Cluster 50 Zone 3B Division 26 13-Feb-2018 14-Feb-2018 8:30 AM 25-Feb-2018 B comments
Closed

Installation of PVC conduits for ground & first floor Approved w/


0277 KHEP-LC-0277
telecommunication outlets at first floor slab of Cluster 50 Zone 3B
Cluster 50 Zone 3B Division 26 13-Feb-2018 14-Feb-2018 9:00 AM 17-Feb-2018 B comments
Closed

Installation of PVC conduits & GI boxes for first floor Fire Alarm & Approved w/
0278 KHEP-LC-0278
Detection System at roof floor slab of Cluster 30 Zone 2B
Cluster 30 Zone 2B Division 27 15-Feb-2018 17-Feb-2018 9:30 AM 20-Feb-2018 B comments
Closed

Installation of PVC conduits & GI boxes for roof floor mechanical


0279 KHEP-LC-0279 Cluster 30 Zone 2B Division 27 15-Feb-2018 17-Feb-2018 9:30 AM Open
equipment control system at roof slab of Cluster 30 Zone 2B

Installation of PVC conduits & GI boxes for ground floor Fire Alarm & Approved w/
0280 KHEP-LC-0280
Detection System at first floor slab of Cluster 64 Zone 3B
Cluster 64 Zone 3B Division 28 15-Feb-2018 17-Feb-2018 9:45 AM 20-Feb-2018 B comments
Closed

Installation of PVC conduits for first floor telecommunication outlets Approved w/


0281 KHEP-LC-0281
at first floor slab of Cluster 64 Zone 3B
Cluster 64 Zone 3B Division 27 15-Feb-2018 17-Feb-2018 10:00 AM 21-Feb-2018 B comments
Closed

Installation of PVC conduits & GI boxes for ground floor mechanical Approved w/
0282 KHEP-LC-0282
equipment control system at first floor slab of Cluster 64 Zone 3B
Cluster 64 Zone 3B Division 26 15-Feb-2018 17-Feb-2018 10:20 AM 20-Feb-2018 B comments
Closed

Installation of PVC conduits & galvanized steel boxes for first floor Approved w/
0283 KHEP-LC-0283
Fire Detection & Alarm System at roof slab of Cluster 9 Zone 1B
Cluster 09 Zone 1B Division 28 15-Feb-2018 17-Feb-2018 9:45 AM 20-Feb-2018 B comments
Closed

Installation of PVC conduits & GI boxes for first & roof floor
0284 KHEP-LC-0284 mechanical equipment control system at roof slab of Cluster 9 Zone Cluster 09 Zone 1B Division 26 15-Feb-2018 17-Feb-2018 10:20 AM Open
1B
Installation of PVC conduits for first floor telecommunication outlets Approved w/
0285 KHEP-LC-0285
at first floor slab of Cluster 24 Zone 2B
Cluster 24 Zone 2B Division 28 15-Feb-2018 17-Feb-2018 10:30 AM 20-Feb-2018 B comments
Closed

Installation of PVC conduits for first floor telecommunication outlets Approved w/


0286 KHEP-LC-0286
at first floor slab of Cluster 22 Zone 2B
Cluster 22 Zone 2B Division 28 15-Feb-2018 17-Feb-2018 11:00 AM 20-Feb-2018 B comments
Closed

Installation of PVC conduits for first floor telecommunication outlets


0287 KHEP-LC-0287
at first floor slab of Cluster 25 Zone 2B
Cluster 25 Zone 2B Division 27 18-Feb-2018 19-Feb-2018 8:00 AM 21-Feb-2018 E Rejected Closed

Installation of PVC conduits for first floor telecommunication outlets Approved w/


0287.1 KHEP-LC-0287-01
at first floor slab of Cluster 25 Zone 2B
Cluster 25 Zone 2B Division 27 21-Feb-2018 22-Feb-2018 10:00 AM 24-Feb-2018 B comments
Closed

Installation of PVC conduits & GI boxes for ground floor mechanical Approved w/
0288 KHEP-LC-0288
equipment control system at first floor slab of Cluster 25 Zone 2B
Cluster 25 Zone 2B Division 26 18-Feb-2018 19-Feb-2018 8:30 AM 20-Feb-2018 B comments
Closed

Installation of PVC conduits & GI boxes for ground floor Fire Alarm &
0289 KHEP-LC-0289
Detection System at first floor slab of Cluster 25 Zone 2B
Cluster 25 Zone 2B Division 28 18-Feb-2018 19-Feb-2018 8:45 AM 20-Feb-2018 E Rejected Closed

Installation of PVC conduits & GI boxes for ground floor Fire Alarm & Approved w/
0289.1 KHEP-LC-0289-01
Detection System at first floor slab of Cluster 25 Zone 2B
Cluster 25 Zone 2B Division 28 21-Feb-2018 22-Feb-2018 9:00 AM 24-Feb-2018 B comments
Closed
Installation of PVC cnduits & galvanized steel boxes for first floor Fire Approved w/
0290 KHEP-LC-0290
Detection & Alarm System at roof slab of Cluster 34 Zone 2B
Cluster 34 Zone 2B Division 28 18-Feb-2018 19-Feb-2018 9:00 AM 20-Feb-2018 B comments
Closed

Installation of PVC conduits & GI boxes for first & roof floor
Approved w/
0291 KHEP-LC-0291 mechanical equipment control system at roof slab of Cluster 34 Zone Cluster 34 Zone 2B Division 28 18-Feb-2018 19-Feb-2018 9:20 AM 21-Feb-2018 B comments
Closed
2B
Installation of PVC conduits & GI boxes for first & roof floor
Approved w/
0292 KHEP-LC-0292 mechanical equipment control system at roof slab of Cluster 18 Zone Cluster 18 Zone 1B Division 26 18-Feb-2018 19-Feb-2018 9:50 AM 20-Feb-2018 B comments
Closed
1B

Installation of PVC cnduits & galvanized steel boxes for first floor Fire Approved w/
0293 KHEP-LC-0293
Detection & Alarm System at roof slab of Cluster 18 Zone 1B
Cluster 18 Zone 1B Division 28 18-Feb-2018 19-Feb-2018 9:00 AM 20-Feb-2018 B comments
Closed

Installation of 6 inch & 4 inch PVC sleeves for telecommunication


Approved w/
0294 KHEP-LC-0294 system at grade beam of Cluster 56 4" for water meter IP Cluster 56 Zone 3B Division 27 18-Feb-2018 19-Feb-2018 10:00 AM 19-Feb-2018 B comments
Closed
Connection & 6" for Subduct Zone 3B Cluster 56

Installation of 6 inch & 4 inch PVC sleeves for telecommunication


Approved w/
0295 KHEP-LC-0295 system at grade beam of Cluster 56 4" for water meter IP Cluster 40 Zone 2B Division 28 20-Feb-2018 21-Feb-2018 10:20 AM 24-Feb-2018 B comments
Closed
Connection & 6" for Subduct Zone 2B Cluster 40

Installation of PVC cnduits & galvanized steel boxes for first floor Fire
0296 KHEP-LC-0296
Detection & Alarm System at roof slab of Cluster 72 Zone 4B
Cluster 72 Zone 4B Division 28 20-Feb-2018 21-Feb-2018 8:00 AM 21-Feb-2018 A Approved Closed

Installation of PVC conduits & GI boxes for first & roof floor
0297 KHEP-LC-0297 mechanical equipment control system at roof slab of Cluster 72 Zone Cluster 72 Zone 4B Division 28 20-Feb-2018 21-Feb-2018 8:30 AM 25-Feb-2018 A Approved Closed
4B
Installation of PVC conduits for telecommunication systemat ground
Approved w/
0298 KHEP-LC-0298 floor of Cluster 20 25mm" for water meter IP Connection & 110mm" Cluster 20 Zone 1B Division 26 20-Feb-2018 21-Feb-2018 9:00 AM 24-Feb-2018 B comments
Closed
for Subduct Zone 1B Cluster 20
Installation of PVC conduits for telecommunication system at ground
Approved w/
0299 KHEP-LC-0299 floor of Cluster 19 25mm" for water meter IP Connection & 110mm" Cluster 19 Zone 1B Division 26 20-Feb-2018 21-Feb-2018 9:20 AM 24-Feb-2018 B comments
Closed
for Subduct Zone 1B Cluster 19
Installation of PVC conduits for telecommunication system at ground
Approved w/
0300 KHEP-LC-0300 floor of Cluster 19 25mm" for water meter IP Connection & 110mm" Cluster 08 Zone 1B Division 26 20-Feb-2018 21-Feb-2018 9:40 AM 24-Feb-2018 B comments
Closed
for Subduct Zone 1B Cluster 08
Installation of PVC conduits for telecommunication system at ground
Approved w/
0301 KHEP-LC-0301 floor of Cluster 17 25mm" for water meter IP Connection & 110mm" Cluster 17 Zone 1B Division 26 20-Feb-2018 21-Feb-2018 10:00 AM 24-Feb-2018 B comments
Closed
for Subduct Zone 1B Cluster 17

Installation of PVC cnduits & galvanized steel boxes for first floor Fire Approved w/
0302 KHEP-LC-0302
Detection & Alarm System at roof slab of Cluster 58 Zone 3B
Cluster 58 Zone 3B Division 28 21-Feb-2018 22-Feb-2018 8:00 AM 24-Feb-2018 B comments
Closed

Installation of PVC conduits & GI boxes for first & roof floor
0303 KHEP-LC-0303 mechanical equipment control system at roof slab of Cluster 58 Zone Cluster 58 Zone 3B Division 28 21-Feb-2018 22-Feb-2018 8:30 AM 25-Feb-2018 E Rejected Closed
3B
Installation of PVC conduits & GI boxes for first & roof floor
0303.1 KHEP-LC-0303-01 mechanical equipment control system at roof slab of Cluster 58 Zone Cluster 58 Zone 3B Division 28 26-Feb-2018 27-Feb-2018 8:30 AM 28-Feb-2018 A Approved Closed
3B

Installation of 6 inch & 4 inch PVC sleeves for telecommunication


Approved w/
0304 KHEP-LC-0304 system at grade beam of Cluster 29 (4' for water meter IP Cluster 29 Zone 2B Division 28 21-Feb-2018 22-Feb-2018 9:00 AM 24-Feb-2018 B comments
Closed
connection & 6inch for subduct) Zone 2B Cluster 29

Installation of PVC conduits and Galvanized steel Box for first floor Approved w/
0305 KHEP-LC-0305
fire Detection and Alarm system at Roof Slabe of Cluster 35
Cluster 35 Zone 2B Division 28 22-Feb-2018 24-Feb-2018 8:00 AM 25-Feb-2018 B comments
Closed

Installation of PVC conduits and GI boxes for first & roof mechanical Approved w/
0306 KHEP-LC-0306
equipment control sytem at Roof slabe of cluster 35
Cluster 35 Zone 2B Division 26 22-Feb-2018 24-Feb-2018 8:30 AM 26-Feb-2018 B comments
Closed

Installation of PVC conduits and Galvanized steel Boxes for first floor Approved w/
0307 KHEP-LC-0307
fire Detection and Alarm system at Roof Slabe of Cluster 44
Cluster 44 Zone 2A Division 28 22-Feb-2018 24-Feb-2018 9:00 AM 25-Feb-2018 B comments
Closed

Installation of PVC conduits and GI boxes for first & roof mechanical
0308 KHEP-LC-0308
equipment control sytem at Roof slabe of cluster 44
Cluster 44 Zone 2A Division 26 22-Feb-2018 24-Feb-2018 9:30 AM 25-Feb-2018 A Approved Closed

Installation of 6 inch and 4 inch PVC sleeves for Telecommunication


Approved w/
0309 KHEP-LC-0309 system at Grade Beam of Cluster 67 . (4 for Water Meter IP Cluster 67 Zone 4A Division 28 22-Feb-2018 24-Feb-2018 9:45 AM 25-Feb-2018 B comments
Closed
Connection and 6 for subduct
Installation of 6 inch and 4 inch PVC sleeves for Telecommunication
Approved w/
0310 KHEP-LC-0310 system at Grade Beam of Cluster28 . (4 for Water Meter IP Cluster 28 Zone 2B Division 28 22-Feb-2018 24-Feb-2018 10:00 AM 25-Feb-2018 B comments
Closed
Connection and 6 for subduct

Installation of PVC conduits for telecommunication system at ground


Approved w/
0311 KHEP-LC-0311 floor of Cluster 21 (25mm" for water meter IP Connection & 110mm Cluster 21 Zone 1B Division 26 24-Feb-2018 25-Feb-2018 8:00 AM 26-Feb-2018 B comments
Closed
for Subduct) Zone 1B Cluster 08

Installation of PVC conduits for telecommunication system at ground


Approved w/
0312 KHEP-LC-0312 floor of Cluster 9 (25mm" for water meter IP Connection & 110mm Cluster 09 Zone 1B Division 26 24-Feb-2018 25-Feb-2018 8:00 AM 26-Feb-2018 B comments
Closed
for Subduct) Zone 1B Cluster 09

Installation of PVC conduits for telecommunication system at ground


Approved w/
0313 KHEP-LC-0313 floor of Cluster 16 (25mm" for water meter IP Connection & 110mm Cluster 16 Zone 1B Division 26 24-Feb-2018 25-Feb-2018 8:30 AM 26-Feb-2018 B comments
Closed
for Subduct) Zone 1B Cluster 16

Installation of PVC conduits and Galvanized steel Boxes for first floor
0314 KHEP-LC-0314 fire Detection and Alarm system at Roof Slabe of Cluster 66 Cluster 60 Zone 3B Division 28 24-Feb-2018 25-Feb-2018 9:20 AM 25-Feb-2018 A Approved Closed
Zone 3B Cluster 60

Installation of PVC conduits and GI boxes for first & roof mechanical
0315 KHEP-LC-0315 equipment control sytem at Roof slabe of cluster 60 Zone 3B Cluster Cluster 60 Zone 3B Division 26 24-Feb-2018 25-Feb-2018 9:40 AM 26-Feb-2018 A Approved Closed
60
Installation of PVC conduits and Galvanized steel Boxes for first floor
fire Detection and Alarm system at Roof Slabe of Cluster 23 Approved w/
0316 KHEP-LC-0316
Zone 1B
Cluster 23 Zone 1B Division 28 24-Feb-2018 25-Feb-2018 9:30 AM 25-Feb-2018 B comments
Closed
Cluster 23
Installation of PVC conduits and GI boxes for first & roof mechanical
0317 KHEP-LC-0317 equipment control sytem at Roof slabe of cluster 23 Zone 1B Cluster Cluster 23 Zone 1B Division 28 24-Feb-2018 25-Feb-2018 9:50 AM 26-Feb-2018 A Approved Closed
23

Installation of PVC conduits for Ground floor Telecommunication Approved w/


0318 KHEP-LC-0318
outlets at first floor slab of cluster42 Zone 2B Cluster 42
Cluster 42 Zone 2B Division 27 24-Feb-2018 25-Feb-2018 1:30 PM 25-Feb-2018 B comments
Closed

Installation of PVC conduits and GI boxes for Ground floor


mechanical equipment control sytem at First Floor slabe of cluster 42
0319 KHEP-LC-0319
Zone 1B
Cluster 42 Zone 1B Division 27 24-Feb-2018 25-Feb-2018 1:45 PM 26-Feb-2018 A Approved Closed
Cluster 42
Installation of PVC conduits and GI boxes for Ground floor Fire Alarm
Approved w/
0320 KHEP-LC-0320 and Detection System at First Floor slabe of cluster 42 Zone 1B Cluster 42 Zone 1B Division 27 24-Feb-2018 25-Feb-2018 2:00 PM 25-Feb-2018 B comments
Closed
Cluster 42
Installation of PVC conduits for Telecommunication system at ground
0321 KHEP-LC-0321 floor of Cluster 06 25mm for Water Meter IP Connection & 110 for Cluster 06 Zone 1B Division 26 27-Feb-2018 28-Feb-2018 1:30 PM Open
Subduct Zone 1B Cluster 06
Installation of PVC conduits for Telecommunication system at ground
0322 KHEP-LC-0322 floor of Cluster 18 25mm for Water Meter IP Connection & 110 for Cluster 18 Zone 1B Division 26 27-Feb-2018 28-Feb-2018 1:30 PM Open
Subduct Zone 1B Cluster 18

Installation of PVC conduits and Galvanized steel Boxes for first floor
0323 KHEP-LC-0323 Cluster 54 Zone 3B Division 28 28-Feb-2018 1-Mar-2018 8:00 AM Open
Fire Detection and Alarm system at Roof Slab of Cluster 54 Zone 3B

Installation of PVC conduits and GI boxes for first & roof floor
0324 KHEP-LC-0324 mechanical equipment control sytem at Roof slab of cluster 54 Zone Cluster 54 Zone 3B Division 26 28-Feb-2018 1-Mar-2018 8:00 AM Open
3B

Installation of PVC conduits and GI boxes for Ground floor Fire Alarm Cluster 65
0325 KHEP-LC-0325 Zone 4A Division 28 28-Feb-2018 1-Mar-2018 9:00 AM
and Detection System at First Floor slab of Cluster 65 Zone 4A

Installation of 6 inch and 4 inch PVC sleeves for Telecommunication


0326 KHEP-LC-0326 system at Grade Beam of Cluster 76 . (4 for Water Meter IP Cluster 76 Zone 4B Division 28 28-Feb-2018 1-Mar-2018 9:30 AM
Connection and 6 for subduct Zone 4B

Installation of PVC conduits for ground & first floor


0327 KHEP-LC-0327 Cluster 26 Zone 2B Division 27 28-Feb-2018 1-Mar-2018 10:00 AM
telecommunication outlets at first floor slab of Cluster 26 Zone 2B

Installation of PVC conduits and GI boxes for ground floor


0328 KHEP-LC-0328 mechanical equipment control sytem at first floor slab of Cluster 26 Cluster 26 Zone 1B Division 26 28-Feb-2018 1-Mar-2018 10:20 AM
Zone 1B

Installation of PVC conduits and GI boxes for Ground floor Fire Alarm
0329 KHEP-LC-0329 Cluster 26 Zone 2B Division 28 28-Feb-2018 1-Mar-2018 10:40 AM
and Detection System at First Floor slab of Cluster 26 Zone 2B
Installation of EMT Conduits & GI boxes for FCU thermostat at first
0330 KHEP-LC-0330 Cluster 15 Zone 1B Division 28 28-Feb-2018 1-Mar-2018 11:00 AM
floor of Cluster 15 Zone 1B
Installation of PVC conduits & GI boxes for Telecom outlet at first
0331 KHEP-LC-0331 Cluster 15 Zone 1B Division 28 28-Feb-2018 1-Mar-2018 11:20 AM
floor of Cluster 15 Zone 1B

STRUCTURAL

PLUMBING
SR NO MATERIAL RECIEVING INSPECTION NO. ACTIVITIES / INSPECTION ITEMS

ARCHITECTURAL
0001 KHEP-MRI-AR-0001-00 Gypsum Ceiling Materials Zone 4B, Cluster 69

0002 KHEP-MRI-AR-0002-00 Gypsum Wall Materials Zone 4B, Cluster 69

0003 KHEP-MRI-AR-0003-00 Gypsum Boards Zone 4B, Cluster 69

0004 KHEP-MRI-AR-0004-00 Rock wool Insulation Zone 4B, Cluster 69

Extruded Polystyrene XPS Right Thermal Insulation Board 28-30 Density, Size
0005 KHEP-MRI-AR-0005-00
1250mm x 600mm x 50mm thk - Alamadar Vapotherm - 8000 m2

USG Sheetrock joint compound 28kg RYD 13bags, USG Sheetrock joint
0006 KHEP-MRI-AR-0006-00
compound 28kg JED 8bags
0007 KHEP-MRI-AR-0007-00 FR 16mm * 1.2 * 3.0m GYPBOARD TE-MADA
Water Proofing for wet Areas, Delmon Durashield Heavy duty permium
0008 KHEP-MRI-AR-0008-00
Waterproofing coating (20kg)

Painting materials - Exterior wall and surface / floor preparation jotun


0009 KHEP-MRI-AR-0009-00
masonry primer 18L, Stucco 25K, Jotafloor Sealer, Comp B 4L & Comp A 16L

0010 KHEP-MRI-AR-0010-00 Durosan Interior EGGSL SK RAL (9001, 9016, 6019, 1015) 18L

0011 KHEP-MRI-AR-0011-00 Extruded Polystyrene Thermal Insulation Boards 125x60x5cm

Kitchen Cabinet made by 18mm with glossy color, Size 215x303x319x cm,
0012 KHEP-MRI-AR-0012-00
Counter Top Staron, Vanity (6pcs) (Steel angle 15 pcs)

0013 KHEP-MRI-AR-0013-00 Painting materials - (Jotun Saudia Co.Ltd)

0014 KHEP-MRI-AR-0014-00 Masonry and Plastering Accessories (wamco - wadi maramer trading Est)

0014.1 KHEP-MRI-AR-0014-01 Masonry and Plastering Accessories (wamco - wadi maramer trading Est)

0015 KHEP-MRI-AR-0015-00 Painting materials - (Jotun Saudia Co.Ltd)

0015.1 KHEP-MRI-AR-0015-01 Painting materials - (Jotun Saudia Co.Ltd)

0016 KHEP-MRI-AR-0016-00 Painting materials - (Jotun Saudia Co.Ltd)

0016.1 KHEP-MRI-AR-0016-01 Painting materials - (Jotun Saudia Co.Ltd)

0017 KHEP-MRI-AR-0017-00 KNF Block Factory - 40x20x20 Concrete Hollow Block Units

0018 KHEP-MRI-AR-0018-00 KNF Block Factory - 40x20x20 Concrete Hollow Block Units

0019 KHEP-MRI-AR-0019-00 Masonry and Plastering Accessories (wamco - wadi maramer trading Est)

0020 KHEP-MRI-AR-0020-00 Joddran cement Al Safwa cemet Co.

0021 KHEP-MRI-AR-0021-00 KNF Block Factory

0022 KHEP-MRI-AR-0022-00 KNF Block Factory


0023 KHEP-MRI-AR-0023-00 KNF Block Factory
Thermal Boards - Extruded polystyrene 125*60*5cm - Alamdar-Vapotherm
0024 KHEP-MRI-AR-0024-00
Co. Ltd.
0025 KHEP-MRI-AR-0025-00 Drywall Metal System - Saudi Scaffolding Factory Binex (Roll form)

0026 KHEP-MRI-AR-0026-00 Joddran Cement Al Safwa cemet Co.


Masonry and Plastering Accessories (wamco - wadi maramer trading Est)
0027 KHEP-MRI-AR-0027-00
Block Ladder 50*3000mm
0028 KHEP-MRI-AR-0028-00 Gypsum Wall Boards - MADA Gypsum, Binex
0029 KHEP-MRI-AR-0029-00 Ceiling Metal Framing System - Saudi Scaffolding Factory
0030 KHEP-MRI-AR-0030-00 Gypsum Boards Assemblies - Roots Group Saudi Allied Metal Co.

0031 KHEP-MRI-AR-0031-00 Masonry & Plastering Accessories WAMCO - Wadi Maramer Trading Est.

0032 KHEP-MRI-AR-0032-00 Sulieman A. R. Namlah Factory Concrete Hollow Bock Units

0033 KHEP-MRI-AR-0033-00 Sulieman A. R. Namlah Factory Concrete Hollow Bock Units

0034 KHEP-MRI-AR-0034-00 Sulieman A. R. Namlah Factory Concrete Hollow Bock Units

0035 KHEP-MRI-AR-0035-00 Sulieman A. R. Namlah Factory Concrete Hollow Bock Units

0036 KHEP-MRI-AR-0036-00 Sulieman A. R. Namlah Factory Concrete Hollow Bock Units

0037 KHEP-MRI-AR-0037-00 Joddran Masonry Cement for Finishing 50kg

0038 KHEP-MRI-AR-0038-00 Sulieman A. R. Namlah Factory Concrete Hollow Bock Units

0039 KHEP-MRI-AR-0039-00 Plumbing fixtures & sanitary Accessories SATAMINA Sham net Trading

Plumbing fixtures & sanitary Accessories PENTA CONCEALED FLASH TANK


0040 KHEP-MRI-AR-0040-00
Raco
0041 KHEP-MRI-AR-0041-00 MADA Gypsum R-TE-M-12.5 x 2400-82 (3,306.24 SQ MTS

0042 KHEP-MRI-AR-0042-00 Ceramic tiles - Rak Ceramic

0043 KHEP-MRI-AR-0043-00 Stamina - Zhejiang Durovin Basin Colossum 802

0044 KHEP-MRI-AR-0044-00 Ceramic tiles - Saudi Ceramic

0045 KHEP-MRI-AR-0045-00 Sulieman A. R. Namlah Factory Concrete Hollow Bock Units

0046 KHEP-MRI-AR-0046-00 Bawani Casework Factory - Door Panels & Frames

0047 KHEP-MRI-AR-0047-00 Sulieman A. R. Namlah Factory Concrete Hollow Bock Units

0048 KHEP-MRI-AR-0048-00 Joddran cement Al Safwa cemet Co. for Finishing

0049 KHEP-MRI-AR-0049-00 Sulieman A. R. Namlah Factory Concrete Hollow Bock Units

0050 KHEP-MRI-AR-0050-00 Sulieman A. R. Namlah Factory Concrete Hollow Bock Units

0051 KHEP-MRI-AR-0051-00 Overhead Coiling Door for Garage - ROLLC for Trading Co. Ltd

0052 KHEP-MRI-AR-0052-00 Joddran cement Al Safwa cemet Co. for Finishing 50kg
0053 KHEP-MRI-AR-0053-00 Metal framing system ROOTS GROUP Saudi Allied Metal Industries
0054 KHEP-MRI-AR-0054-00 Sulieman A. R. Namlah Factory Concrete Hollow Bock Units
0055 KHEP-MRI-AR-0055-00 MADA Gypsum

CIVIL
Epoxy coated steel bars receiving inspection for 10mm, 12mm, 16mm &
0001 KHEP-MRI-CI-0001-00
20mm

0002 KHEP-MRI-CI-0002-00 Concure WB 309 (Fosroc) for curing Compound as per attached deliveries

0003 KHEP-MRI-CI-0003-00 Polyethylene sheet as per attached deliveries


0003.1 KHEP-MRI-CI-0003-01 Polyethylene sheet as per attached deliveries
0004 KHEP-MRI-CI-0004-00 Sika Bitumen 60 for bituminous paint as per attached deliveries
Bonding agent & concrete repairs, vendor name: fosam co. as per attached
0005 KHEP-MRI-CI-0005-00
deliveries
0006 KHEP-MRI-CI-0006-00 CMU blocks per attached deliveries. Saudi ready mix concrete co. ltd.

0006.1 KHEP-MRI-CI-0006-01 CMU blocks per attached deliveries. Saudi ready mix concrete co. ltd.

0007 KHEP-MRI-CI-0007-00 UPVC Pipe for Spacer

0008 KHEP-MRI-CI-0008-00 Formworks,plywood per attached deliveries


Formworks,Accessories & scaffolding system(Manar al omran) per attached
0008.1 KHEP-MRI-CI-0008-01
deliveries
0009 KHEP-MRI-CI-0009-00 Inspection of Fine Sand From Supplier (Hameed Al-Salmi)
0010 KHEP-MRI-CI-0010-00 Hollow Concrete Block, Open 2 Holes, (Sulieman A.R Namlah Factory)

0011 KHEP-MRI-CI-0011-00 FRP Structural manhole Dia. 120mm, Thickness 12mm. ( Mockup Manhole)

0011.1 KHEP-MRI-CI-0011-01 FRP Structural manhole Dia. 120mm, Thickness 12mm. ( Mockup Manhole)

0012 KHEP-MRI-CI-0012-00 Wire mesh as per attached deliveries


0012.1 KHEP-MRI-CI-0012-01 Wire mesh as per attached deliveries
Reinforcement steel, Manufacturer, Vendor : Rajihi Steel Site
0013 KHEP-MRI-CI-0013-00
store area
Inspection of GRP Manholes Dia 1200mm supplier (Techno fiber) Main
0014 KHEP-MRI-CI-0014-00
Store

Reinforcement steel, (Plain rebar), Manufacturer, Vendor Rajhi Steel


0015 KHEP-MRI-CI-0015-00
Site store area

Reinforcement steel, (epoxy rebar), Manufacturer, Vendor : Bawan Metal


0016 KHEP-MRI-CI-0016-00 industries Co Site store
area
Inspection of GRP Manholes Dia 1200mm supplier (Techno fiber) Main
0017 KHEP-MRI-CI-0017-00
Store
Inspection of GRP Manholes Dia 1200mm supplier (Techno fiber) Main
0017.1 KHEP-MRI-CI-0017-01
Store
Inspection of GRP Manholes Dia 1200mm supplier (Techno fiber)22 pieces
0018 KHEP-MRI-CI-0018-00
Main Store
0019 KHEP-MRI-CI-0019-00 Sika Bitumen Paint - 60 Material Receiving as per attached deliveries
Reinforcement steel, (epoxy rebar), Manufacturer, Vendor : Bawan Metal
0020 KHEP-MRI-CI-0020-00 industries Co Site store
area
Inspection of GRP Manholes Dia 1200mm supplier (Techno fiber)50 pieces
0021 KHEP-MRI-CI-0021-00
Main Store
Inspection of GRP Manholes Dia 1200mm supplier (Techno fiber) 20 pieces
0022 KHEP-MRI-CI-0022-00
Main Store

0022.1 KHEP-MRI-CI-0022-01 Inspection of GRP Manholes Dia 1200mm supplier (Techno fiber) 33 pieces

Reinforcement steel, (epoxy rebar), Manufacturer, Vendor : Bawan Metal


0023 KHEP-MRI-CI-0023-00 industries Co 16mm (95 ton) - 20mm (42 ton)
Site store area
Reinforcement steel, (epoxy rebar), Manufacturer, Vendor : Bawan Metal
industries Co 10mm (15.4 ton) - 12mm (32.3 ton) - 16mm (153.6 ton) -
0024 KHEP-MRI-CI-0024-00
20mm (23.95 ton) Site
store area

Reinforcement steel, (epoxy rebar), Manufacturer, Vendor : Bawan Metal


0025 KHEP-MRI-CI-0025-00 industries Co 12mm (20 ton) - 16mm (56 ton) - 20mm (100 ton)
Site store area

0026 KHEP-MRI-CI-0026-00 Sika Bitumen - 60sa, Packing : 200LT, Unit : DRM, Delivered Qty : 25
Reinforcement steel ( epoxy rebar ) , manufacturer ,vendor Bawan metal
0027 KHEP-MRI-CI-0027-00 industries ø 8mm ( 4 ton ) - ø 10 mm ( 30 ton ) - ø 12mm ( 60 ton ) - ø
20mm ( 46 ton )
Reinforcement steel ( epoxy rebar ) , manufacturer ,vendor : Bawan metal
industries reinforcement steel ( plain steel ) , manufacturer ,vendor : RAJHI
0028 KHEP-MRI-CI-0028-00
STEEL ø 10mm ( 8 ton ) - ø 12 mm ( 84 ton ) - ø 16mm ( 60 ton ) - ø 20mm
( 52 ton )
Reinforcement steel ( epoxy rebar ) , manufacturer ,vendor : Bawan metal
industries reinforcement steel ( plain steel ) , manufacturer ,vendor : RAJHI
0029 KHEP-MRI-CI-0029-00
STEEL ø 10mm ( 126 ton ) - ø 12 mm ( 148 ton ) - ø 16mm ( 164 ton ) - ø
20mm ( 12 ton )

Reinforcement steel ( epoxy rebar ) , manufacturer ,vendor : Bawan metal


0030 KHEP-MRI-CI-0030-00
industries ø 12 mm ( 92 ton ) - ø 10mm ( 36 ton ) - ø 16mm ( 112 ton )

0031 KHEP-MRI-CI-0031-00 Tie Wire (electro Galvanized as per attached dilivery note
Reinforcement Steel Plain Steel Manhufacturer Vendor Rajhi Steel 10mm-
0032 KHEP-MRI-CI-0032-00
6ton 12mm-112ton 16mm-8ton 20mm-86ton 25mm-4ton
Reinfocement Steel Epoxy Rebar Manufacturer Vendor BRC Industries 20mm-
10ton 10mm-14ton 16mm 4ton
0033 KHEP-MRI-CI-0033-00
Reinforcement Steel Plain Steel Manufacturer Vendor RAJHI Steel 12mm-
450ton 20mm-60ton
Reinforcement steel bar Plain Steel 12mm - 450 ton
0034 KHEP-MRI-CI-0034-00
Manufaturer & Vendor RAJHI STEEL
Inspection of GRP INS.Chamber Dia 600 & 900 mm Supplier Technofiber 2
0035 KHEP-MRI-CI-0035-00
Piieces
Reinforcement steel plain steel manufacturer vendor RAJHI STEEL 16mm
0036 KHEP-MRI-CI-0036-00
60ton
Reinforcement steel plain steel manufacturer vendor RAJHI STEEL 12mm
0037 KHEP-MRI-CI-0037-00
30ton 25mm 4ton 16mm 26ton

0038 KHEP-MRI-CI-0038-00 Tie Wire electro Galvanized vendor name IKK unitech quantity 10 ton

Reinforcement steel plain steel manufacturer vendor RAJHI STEEL 12mm 90


0039 KHEP-MRI-CI-0039-00
to
Reinforcement steel plain steel manufacturer vendor Rajhi Steel 10mm 30ton
0040 KHEP-MRI-CI-0040-00
16mm 90ton

Reinforcement steel plain steel manufacturer vendor RAJHI STEEL


0041 KHEP-MRI-CI-0041-00
Reinforcement steel Epoxy Rebar manufacturer vendor BRC Industries

Inspection of versatile high strength webertec 301 white 25kg 600bag


0042 KHEP-MRI-CI-0042-00
Quantity

ELECTRICAL
PVC conduit,adapter & Coupling,black,high impact & heavy duty grade type
0001 KHEP-MRI-EL-0001-00
Site Office 1 Staging Area(Warehouse)

25mm ø and 50mmø HDPE Pipe SDR11 Black 6"ø and 4"ø PVC Pipe NEMA
0002 KHEP-MRI-EL-0002-00
TC-6 Gray PVC coupling and Elbow
a) 6"ø and 4"ø PVC Pipe NEMA TC-6 and TC-8 b) 6"ø Fab PVC Coupling c)
0002.1 KHEP-MRI-EL-0002-01
4"ø UPVC Elbow 48" Radius NEMA TC-9
a) 6"ø and 4"ø PVC Pipe NEMA TC-6 and TC-8 b) 6"ø Fab PVC Coupling c)
0002.2 KHEP-MRI-EL-0002-02
4"ø UPVC Elbow 48" Radius NEMA TC-9

0002.3 KHEP-MRI-EL-0002-03 a) 6"ø and 4"ø PVC Pipe NEMA TC-6 and TC-8 b) 6"ø Fab PVC Coupling

0002.4 KHEP-MRI-EL-0002-04 150 pcs 4"ø PVC Pipe NEMA TC-6 and 200 pcs 4"ø PVC Pipe NEMA TC-6

Galvanized Steel Boxes (Square and Octagonal) Galvanized Steel Cover


0003 KHEP-MRI-EL-0003-00
(Round and Square) PVC Female Adaptor and Coupling
a) 1"ø and 2"ø EMT Conduit b) 1"ø and
2"ø EMT Compression Coupling c)
0004 KHEP-MRI-EL-0004-00 1"ø and 2"ø EMT Compression Connector
d) 1"ø and 2"ø EMT Starp two Holes e) 2"ø
EMT Bend (90 std. Radius)
EMT Conduit , Clamp Strap , EMT Connector & EMT Coupling Compression
0005 KHEP-MRI-EL-0005-00
Connector
Single Core LV wires (Cu./LSOH-XL 450/750V) Copper Conductor & LSOH-XL
0006 KHEP-MRI-EL-0006-00
Insulation Brand
0007 KHEP-MRI-EL-0007-00 Lighting & Power Panelboard Brand ABB Mini Center
0007.1 KHEP-MRI-EL-0007-01 Lighting & Power Panelboard Brand ABB Mini Center

0008 KHEP-MRI-EL-0008-00 Flexible conduits and fittings as per attached dilivery note
0009 KHEP-MRI-EL-0009-00 Non Fusible Disconnect switch 30A 600V 3Pole Mode General Electric
Meterial receiving inspection for lighting fixtures as per attached meterial
0010 KHEP-MRI-EL-0010-00
delevery note

HVAC
Metal Ducts and Fittings GL Gauge 24 & 26 (Assorted Sizes) Cleats Gauge 24
0001 KHEP-MRI-HVAC-0001-00
Type ''C" & "S"
Metal Ducts and Fittings GL Gauge 24 & 26 (Assorted Sizes) Cleats Gauge 24
0001.1 KHEP-MRI-HVAC-0001-01
Type ''C" & "S"
Metal Ducts and Fittings GI 26,24 Assorted size as per attached 10 Cluster B2
0002 KHEP-MRI-HVAC-0002-00
Blenum Box, Rectangular VCD Split Damper

Metal Ducts and Fittings GI 26,24 Assorted size for SAD,RAD,EXAD & FAD at
GF,FF & RF Villa type B2 Cluster 10 as per attached
0002.1 KHEP-MRI-HVAC-0002-01
Metal Duct Rizer GI 26 Assorted size for Cluster 1 B2 as per Attached
Plenum Box Rectangular VCD Split Damper for Villa 1 type B2 as pe rattached

Metal Ducts and Fittings GI 26,24 Assorted size for SAD,RAD,EXAD & FAD at
GF,FF & RF Villa type B2 Cluster 10 as per attached
0002.2 KHEP-MRI-HVAC-0002-02
Metal Duct Rizer GI 26 Assorted size for Cluster 1 B2 as per Attached
Plenum Box Rectangular VCD Split Damper for Villa 1 type B2 as pe rattached

Inspection for FCU unit Concealed Multy - v 111 indoor Concealed duct
0003 KHEP-MRI-HVAC-0003-00
indoor Manufacturer LG
Metal duct & fitting GI 26,24 assorted size SAD,RAD, EXAD & FAD at
0004 KHEP-MRI-HVAC-0004-00
GF,FF,RF villa type A6 Cluster 1 as per attached

0005 KHEP-MRI-HVAC-0005-00 Inspection Exhaus fan unit for mock up only Manufacturer Greenheck

0006 KHEP-MRI-HVAC-0006-00 Inspection of Multy V-IV out door unit for mock up only Manufacturer LG

MECHANICAL
0001 KHEP-MRI-ME-0001-00 Galvanized Steel Pipes,ERW,Sch. 40/SASO 1011 Sizes 6", 4", 3"
Glass Fiber Reinforced Plastic (GRP) and Coupler Sizes 800mm, 600mm,
0002 KHEP-MRI-ME-0002-00 500mm
Zone 1A
Glass Fiber Reinforced Plastic (GRP) and Coupler Sizes 800mm, 600mm,
0002.1 KHEP-MRI-ME-0002-01 500mm
Zone 1A

Unplasticised Polyvinyl Chloride Pipes Size 200x9.6mm, Class 4, PN10


0003 KHEP-MRI-ME-0003-00 Unplasticised Polyvinyl Chloride Pipes Size 250x11.9mm, Class 4, PN10
Temporary Staging Area

Unplasticised Polyvinyl Chloride Pipes Size 315mm, Class 4, 10 Bars, DIN8062


with Rubber seal
0004 KHEP-MRI-ME-0004-00
Temporary Staging Area & New Warehouse

Un plasticized Polyvinyl Chloride Pipes Size 315mm, Class 4, 10 Bars,


DIN8062 with Rubber seal
0004.1 KHEP-MRI-ME-0004-01

0005 KHEP-MRI-ME-0005-00 Glass Fiber Reinforced Plastic (GRP)


Unplasticised Polyvinyl Choride Pipes Size 200x9.6mm, Class 4, PN10, DIN
0006 KHEP-MRI-ME-0006-00
8062 (R/J) (250 pcs)
0007 KHEP-MRI-ME-0007-00 Un plasticized Polyvinyl Chloride Pipes,Class, PN10
Un plasticized Polyvinyl Chloride Pipes Sizes 250x11.9mm,Class 4 PN10 Din
0008 KHEP-MRI-ME-0008-00
8062 (R/J) (5Pcs)
0009 KHEP-MRI-ME-0009-00 PPR PIPES & Fitting
Un plasticized Polyvinyl Chloride Pipes Sizes 200x9.6mm,Class 4 PN10 Din
0010 KHEP-MRI-ME-0010-00
8062 (R/J) (240Pcs)
0011 KHEP-MRI-ME-0011-00 Glass Fiber Reinforced Plastic (GRP)
0012 KHEP-MRI-ME-0012-00 Glass Fiber Reinforced Plastic (GRP) Pipes ; 800mm (2pcs)
Un plasticized Polyvinyl Chloride Pipes, Class 4, PN10, DIN8062, Solvent joint
Size: 50x2.4mm,32x1.8mm,25x1.5mm Un
plasticized Polyvinyl Chloride Pipes, Class 5, PN16, DIN8062, Solvent joint
0013 KHEP-MRI-ME-0013-00
Size: 20x1.5mm
Un plasticized Polyvinyl Chloride Fitting, Various Types & Size, PN16,
Solvent joint
0014 KHEP-MRI-ME-0014-00 Glass Fiber Reinforced Plastic (GRP)
0014.1 KHEP-MRI-ME-0014-01 Glass Fiber Reinforced Plastic (GRP)
0014.2 KHEP-MRI-ME-0014-02 Glass Fiber Reinforced Plastic (GRP)

Un plasticized Polyvinyl Chloride Pipes, Class 5, Sch.80 (intend as Pipe


0015 KHEP-MRI-ME-0015-00
Sleeves) Sizes: 1 1/2" (18pcs) 2" (7pcs), 3" (29pcs), 4" (52Pcs), 6" (25pcs)

PVC Pipe Cement and Cleaner PVC


0016 KHEP-MRI-ME-0016-00 Cement "MMP-917", 240pcs x 946ml PVC Pipe
Cleaner "MMp-970", 540pcs x 946ml

Un plasticized Polyvinyl Chloride Pipes, Class 4, Solvent joint Size:


75x3.6mm,50x2.4mm,25x1.5mm
Un plasticized Polyvinyl Chloride Pipes, Class 5, Solvent joint
Size: 20x1.5mm
0017 KHEP-MRI-ME-0017-00
Un plasticized Polyvinyl Chloride Wye M/F/F/
Size 110mm & 50mm, Solvent Joint
Un plasticized Polyvinyl
Chloride Wye M/F/F/ Size 110mm & 75mm, Solvent Joint

PRP Pipes & Fitings (Various Size as per Attached list) uPVC Floor Traps
0018 KHEP-MRI-ME-0018-00
110x75x50x50mm (32pcs)
0019 KHEP-MRI-ME-0019-00 Galvanized Pipes & Fitttings (Various Size as per Attached list)
Un plasticized Polyvinyl Chloride Pipes, Class 5, Sch.80 (intend as Pipe
0020 KHEP-MRI-ME-0020-00
Sleeves) Sizes: 1" (5pcs) 6" (83pcs)
0021 KHEP-MRI-ME-0021-00 PPR Tee 25mm,PN25 (1080 pcs)
Pipe hangers with EPDM Lining, ANSI/MSS sp-69 & sp-58, Type12 (for
0022 KHEP-MRI-ME-0022-00
plumbing and Drainage)
Galvanized Pipes for Fire Fighting System {(Size 1"(457pcs), 2.5" (7pcs), 3"
0023 KHEP-MRI-ME-0023-00
(176pcs)}
Warning tape, Detecable "Caution: Buried Storm Line Below", Green
0024 KHEP-MRI-ME-0024-00 (16Rolls), Warning tape, Detecable "Caution: Buried Potable Water Line
Below", Green (24Rolls)
Unplasticised Polyvinyl Chloride Fittings, Various Types & Sizes, PN16,
0025 KHEP-MRI-ME-0025-00 Solvent Joint (As Per Attached List) Polyvinyl Chloride Floor Traps, Solvent
Joint 110x75x50x50mm (192 Pcs)

Unplasticised Polyvinyl Chloride Fittings, Various Types & Sizes, PN16,


0025.1 KHEP-MRI-ME-0025-01
Solvent Joint (As Per Attached List) Manufacturer : AL MUNIF PIPE/METI

Malleable Iron Fittings, Galvanized #150, ASTM A197, "Gourd" Brand Elbows,
0026 KHEP-MRI-ME-0026-00
Equal Tees, Reducing Couplings (Various Sizes As per Attached List)

Mechanical Couplings and Fittings for fire Fighting System, "Well fit" Brand
0027 KHEP-MRI-ME-0027-00 Elbows, Equal Tees, Mechanical branch lets, Reducers, Couplings, cap
(various Sizes As per Attached List)
Mechanical Couplings and Fittings for fire Fighting System, "Well fit" Brand
0027.1 KHEP-MRI-ME-0027-01 Elbows, Equal Tees, Mechanical branch lets, Reducers, Couplings, cap
(various Sizes As per Attached List)
Warning tape, Detectable "Caution: Sewer Line ", Green (13Rolls), Warning
tape, Detectable "Caution: Irrigation Water Line ", Blue (19Rolls)
0028 KHEP-MRI-ME-0028-00
Manufacturer: ELEFIT
ARABIA FACTORY CO.
Thermal Closed Cell Elastomeric Foam Insulation for DHW and Condensate
0029 KHEP-MRI-ME-0029-00 Drain: 1/2" thick x 7/8" dia. 1.8meter/pc =84 pcs 1/2" thick x 21/8"
dia. 1.8meter/pc =28 pcs
0030 KHEP-MRI-ME-0030-00 UPVC - MMP 1KG - Solvent Cement & Cleaner
0031 KHEP-MRI-ME-0031-00 UPVC Pipe, Class 4, PN10 (Almunif Pipe)
UPVC Pipe Fittings for ( soil,Vent,West,condensate drainage) Meti (pn6,pn16)
0032 KHEP-MRI-ME-0032-00
Almunif pipe
0033 KHEP-MRI-ME-0033-00 UPVC Pipe (Short Piece) Class 4 R/J
UPVC Wye Tee Branch 45 Deg, SCh. 40 R/J Size 200, UPVC Elbow 45 Deg,
0034 KHEP-MRI-ME-0034-00
Sch. 40 R/J Size 200 mm
0035 KHEP-MRI-ME-0035-00 UPVC Coupling Repaire, Class 4 R/J Size 200 mm 20pcs

UPVC Pipe and Fittings Class 4, R/J Size 160 mm (Pipe, WTE Tee, Repair
0036 KHEP-MRI-ME-0036-00
Socket, Elbow 45) UPVC Repair Socket Class 4 R/J Size 200 mm

AVK Gate Valve (200 mm - PN 16, 400 mm - PN16) & Dismantling joint (200
0037 KHEP-MRI-ME-0037-00
mm - PN 16, 400 mm)
UPVC Pipe for Irrigation System (CL.5, PN 16 R/J) - Size 160mm, 110mm &
0038 KHEP-MRI-ME-0038-00
90mm
HDPE Pipe for Potable Water System & Fire Water (PE100, SDR11, PN16
0039 KHEP-MRI-ME-0039-00
BT.w) Size 140mm, 160mm & 200mm
HDPE Pipe for Potable Water System & Fire Water (PE100, SDR11, PN16
0040 KHEP-MRI-ME-0040-00
BT.w) Size 110mm, 63mm

HDPE Pipe Fittings for Potable Water System & Fire Water (PE100, SDR11,
0041 KHEP-MRI-ME-0041-00
PN16 BT.w) Elbow, TEE & Flange Adaptor With Steel Flange PP Coated

0042 KHEP-MRI-ME-0042-00 UPVC Pipe for (Pipe Sleeves) Meti Sch 80


Hangers and Supports for Fire Protection System As per Attached Delivery
0043 KHEP-MRI-ME-0043-00
Notes
Pipe Hangers, Supports and Accessories for Plumbing System As per
0044 KHEP-MRI-ME-0044-00
Attached Delivery Notes
0045 KHEP-MRI-ME-0045-00 UPVC Pipe for Drainage System Soil west & vent Cluster 04
0046 KHEP-MRI-ME-0046-00 UPVC Pipe for Drainage System Soil west & vent Cluster 04 PN10 S/C
Inspection of Pipe fittings for Drainages system soil west & vent cl 4 s/c
0046.1 KHEP-MRI-ME-0046-01
elbow reducer tee wye tee socket scrow cap floow trap mmp
0047 KHEP-MRI-ME-0047-00 UPVC Cement Heavy Duty 1KG & Cleaner 1KG as Highlighted MMP
0048 KHEP-MRI-ME-0048-00 UPVC Pipe for Drainage System CD Cluster 05 PN16 S/C Meti MMP
0049 KHEP-MRI-ME-0049-00 Insulation Rubber Tube (INSOFLEX) for Hot Water Line & CD Pipe
0049.1 KHEP-MRI-ME-0049-01 Insulation Rubber Tube (INSOFLEX) for Hot Water Line & CD Pipe
UPVC Pipe PN10 Fittings PN6 PN16 UPVC Cement heavy duty 1KG & Cleaner
0050 KHEP-MRI-ME-0050-00
1KG for Drainage System Meti MMP

0051 KHEP-MRI-ME-0051-00 PPR Pipe PN20 & Fittings PN25 for Water supply system Metitherm MMP

Pipe Fitting & unions 50mm & smaller threaded end fittings class 150 for fire
0052 KHEP-MRI-ME-0052-00
protection
0053 KHEP-MRI-ME-0053-00 PPR Fittings PN25 for Water Supply System, Metitherm - MMP
ERW Pipe Galvanized CS Pipe ASTM A53 Schedule 40 - Grade B - Al Jazeera
0054 KHEP-MRI-ME-0054-00
Pipes

LOW CURRENT (Telecom)


0001 KHEP-MRI-LC-0001-00 50mm ø HDPE Pipe Sdr11 Black, 25mm ø HDPE Pipe SDR11 Black

0001.1 KHEP-MRI-LC-0001-01 83000 LM - 25mm ø HDPE Pipe SDR11 Black

a) 4"ø PVC Pipe Nema TC-6 and TC-8 b) 4"ø


0002 KHEP-MRI-LC-0002-00
PVC Elbow 48" Radius Nema TC-9
0003 KHEP-MRI-LC-0003-00 Fire Alarm Cable 2C16 AWG 2C14 AWG
0004 KHEP-MRI-LC-0004-00 1 Piece 600x 600 E&A BSAISO Telecommunication Cabinet

0005 KHEP-MRI-LC-0005-00 5 Rolls Commscope CAT6A UTP Cable

STRUCTURAL
PLUMBING
A Approved

B Approved With Comments

E Rejected
SUBMITTED FOR RESPONDED AS
SUBMITTED DATE DISCIPLINE DATE RESPONDED
CODE STATUS CODE STATUS

Approved w/
5-Sep-2017 Architectural 1 Approval 7-Sep-2017 B comments
Approved w/
5-Sep-2017 Architectural 1 Approval 7-Sep-2017 B comments
Approved w/
5-Sep-2017 Architectural 1 Approval 7-Sep-2017 B comments
5-Sep-2017 Architectural 1 Approval 7-Sep-2017 A Approved

5-Sep-2017 Architectural 1 Approval 7-Sep-2017 A Approved

11-Sep-2017 Architectural 1 Approval 13-Sep-2017 A Approved

12-Sep-2017 Architectural 1 Approval 19-Sep-2017 A Approved


Approved w/
7-Oct-2017 Architectural 1 Approval 9-Oct-2017 B comments

Approved w/
7-Oct-2017 Architectural 1 Approval 9-Oct-2017 B comments

Approved w/
11-Oct-2017 Architectural 1 Approval 15-Oct-2017 B comments
22-Oct-2017 Architectural 1 Approval 26-Oct-2017 A Approved

22-Oct-2017 Architectural 1 Approval 25-Oct-2017 E Rejected

Approved w/
9-Nov-2017 Architectural 1 Approval 13-Nov-2017 B comments

12-Nov-2017 Architectural 1 Approval 19-Nov-2017 E Rejected

22-Nov-2017 Architectural 1 Approval 25-Nov-2017 A Approved

13-Nov-2017 Architectural 1 Approval 19-Nov-2017 E Rejected


Approved w/
22-Nov-2017 Architectural 1 Approval 25-Nov-2017 B comments
18-Nov-2017 Architectural 1 Approval 22-Nov-2017 E Rejected
Approved w/
26-Nov-2017 Architectural 1 Approval 28-Nov-2017 B comments
Approved w/
27-Nov-2017 Architectural 1 Approval 30-Nov-2017 B comments
30-Nov-2017 Architectural 1 Approval 12-Dec-2017 A Approved

2-Dec-2017 Architectural 1 Approval 5-Dec-2017 A Approved

Approved w/
7-Dec-2017 Architectural 1 Approval 12-Dec-2017 B comments
Approved w/
7-Dec-2017 Architectural 1 Approval 12-Dec-2017 B comments
10-Dec-2017 Architectural 1 Approval 20-Dec-2017 E Rejected
13-Dec-2017 Architectural 1 Approval 16-Dec-2017 A Approved

18-Dec-2017 Architectural 1 Approval 21-Dec-2017 E Rejected

21-Dec-2017 Architectural 1 Approval 27-Dec-2017 A Approved


Approved w/
23-Dec-2017 Architectural 1 Approval 27-Dec-2017 B comments
25-Dec-2017 Architectural 1 Approval 31-Dec-2017 A Approved

31-Dec-2017 Architectural 1 Approval 4-Jan-2018 A Approved


31-Dec-2017 Architectural 1 Approval 4-Jan-2018 A Approved
31-Dec-2017 Architectural 1 Approval 4-Jan-2018 A Approved
Approved w/
6-Jan-2018 Architectural 1 Approval 10-Jan-2018 B comments
Approved w/
6-Jan-2018 Architectural 1 Approval 10-Jan-2018 B comments
Approved w/
7-Jan-2018 Architectural 1 Approval 10-Jan-2018 B comments
Approved w/
8-Jan-2018 Architectural 1 Approval 15-Jan-2018 B comments
Approved w/
10-Jan-2018 Architectural 1 Approval 15-Jan-2018 B comments
Approved w/
11-Jan-2018 Architectural 1 Approval 15-Jan-2018 B comments
Approved w/
11-Jan-2018 Architectural 1 Approval 15-Jan-2018 B comments
Approved w/
13-Jan-2018 Architectural 1 Approval 21-Jan-2018 B comments
Approved w/
14-Jan-2018 Architectural 1 Approval 20-Jan-2018 B comments
Approved w/
14-Jan-2018 Architectural 1 Approval 20-Jan-2018 B comments
15-Jan-2018 Architectural 1 Approval 20-Jan-2018 A Approved
Approved w/
18-Jan-2018 Architectural 1 Approval 22-Jan-2018 B comments
Approved w/
18-Jan-2018 Architectural 1 Approval 22-Jan-2018 B comments
Approved w/
18-Jan-2018 Architectural 1 Approval 22-Jan-2018 B comments
Approved w/
18-Jan-2018 Architectural 1 Approval 21-Jan-2018 B comments
23-Jan-2018 Architectural 1 Approval 28-Jan-2018 E Rejected
Approved w/
30-Jan-2018 Architectural 1 Approval 31-Jan-2018 B comments
31-Jan-2018 Architectural 1 Approval 3-Feb-2018 A Approved
Approved w/
31-Jan-2018 Architectural 1 Approval 1-Feb-2018 B comments
Approved w/
4-Feb-2018 Architectural 1 Approval 6-Feb-2018 B comments
Approved w/
11-Feb-2018 Architectural 1 Approval 14-Feb-2018 B comments
13-Feb-2018 Architectural 1 Approval 14-Feb-2018 A Approved
17-Feb-2018 Architectural 1 Approval 20-Feb-2018 E Rejected
17-Feb-2018 Architectural 1 Approval
27-Feb-2018 Architectural 1 Approval

15-Feb-2017 Civil 1 Approval 16-Feb-2017 A Approved

6-Mar-2017 Civil 1 Approval 8-Mar-2017 A Approved

7-Mar-2017 Civil 1 Approval 11-Mar-2017 E Rejected


13-Mar-2017 Civil 1 Approval 15-Mar-2017 A Approved
7-Mar-2017 Civil 1 Approval 11-Mar-2017 A Approved
Approved w/
8-Mar-2017 Civil 1 Approval 11-Mar-2017 B comments
Approved w/
15-Mar-2017 Civil 1 Approval 18-Mar-2017 B comments
20-Apr-2017 Civil 1 Approval 23-Apr-2017 A Approved
Approved w/
28-Mar-2017 Civil 1 Approval 30-Mar-2017 B comments
18-Apr-2017 Civil 1 Approval 22-Apr-2017 E Rejected
Approved w/
24-Mar-2017 Civil 1 Approval 25-Apr-2017 B comments
9-May-2017 Civil 1 Approval 11-May-2017 A Approved
29-May-2017 Civil 1 Approval 30-May-2017 A Approved

12-Jul-2017 Civil 1 Approval 13-Jul-2017 E Rejected

Approved w/
6-Aug-2017 Civil 1 Approval 7-Aug-2017 B comments
17-Jul-2017 Civil 1 Approval 19-Jul-2017 E Rejected
2-Nov-2017 Civil 1 Approval 4-Nov-2017 A Approved

16-Sep-2017 Civil 1 Approval 30-Sep-2017 A Approved

Approved w/
5-Oct-2017 Civil 1 Approval 8-Oct-2017 B comments

Approved w/
11-Oct-2017 Civil 1 Approval 12-Oct-2017 B comments

11-Oct-2017 Civil 1 Approval 12-Oct-2017 A Approved

16-Oct-2017 Civil 1 Approval 19-Oct-2017 E Rejected

21-Oct-2017 Civil 1 Approval 24-Oct-2017 A Approved

23-Oct-2017 Civil 1 Approval 24-Oct-2017 A Approved

24-Oct-2017 Civil 1 Approval 26-Oct-2017 A Approved

29-Oct-2017 Civil 1 Approval 30-Oct-2017 A Approved

29-Oct-2017 Civil 1 Approval 1-Nov-2017 A Approved

2-Nov-2017 Civil 1 Approval 6-Nov-2017 E Rejected

27-Dec-2017 Civil 1 Approval 30-Dec-2017 A Approved

4-Nov-2017 Civil 1 Approval 4-Nov-2017 A Approved

4-Nov-2017 Civil 1 Approval 4-Nov-2017 A Approved

4-Nov-2017 Civil 1 Approval 4-Nov-2017 A Approved

8-Nov-2017 Civil 1 Approval 9-Nov-2017 A Approved

9-Nov-2017 Civil 1 Approval 13-Nov-2017 A Approved

9-Nov-2017 Civil 1 Approval 11-Nov-2017 A Approved


9-Nov-2017 Civil 1 Approval 11-Nov-2017 A Approved

Approved w/
30-Nov-2017 Civil 1 Approval 7-Dec-2017 B comments

17-Dec-2017 Civil 1 Approval 19-Dec-2017 A Approved

30-Dec-2017 Civil 1 Approval 2-Jan-2018 A Approved

2-Dec-2018 Civil 1 Approval 4-Jan-2018 A Approved

7-Jan-2018 Civil 1 Approval 9-Jan-2018 A Approved

Approved w/
15-Jan-2018 Civil 1 Approval 20-Jan-2018 B comments

21-Jan-2018 Civil 1 Approval 24-Jan-2018 A Approved

1-Feb-2018 Civil 1 Approval 4-Feb-2018 A Approved

Approved w/
1-Feb-2018 Civil 1 Approval 4-Feb-2018 B comments
Approved w/
6-Feb-2018 Civil 1 Approval 10-Feb-2018 B comments

19-Feb-2018 Civil 1 Approval 20-Feb-2018 A Approved

25-Feb-2018 Civil 1 Approval 27-Feb-2018 A Approved

25-Feb-2018 Civil 1 Approval 27-Feb-2018 A Approved

Approved w/
30-May-2017 Electrical 1 Approval 3-Jun-2017 B comments

1-Jun-2017 Electrical 1 Approval 8-Jun-2017 E Rejected

13-Jul-2017 Electrical 1 Approval 18-Jul-2017 E Rejected

7-Aug-2017 Electrical 1 Approval 15-Aug-2017 E Rejected

20-Aug-2017 Electrical 1 Approval 29-Aug-2017 E Rejected

30-Oct-2017 Electrical 1 Approval 6-Nov-2017 A Approved

Approved w/
1-Jun-2017 Electrical 1 Approval 6-Jun-2017 B comments

7-Aug-2017 Electrical 1 Approval 27-Aug-2017 E Rejected

Approved w/
25-Dec-2017 Electrical 1 Approval 27-Dec-2017 B comments

10-Jan-2018 Electrical 1 Approval 13-Jan-2018 A Appoved

16-Jan-2018 Electrical 1 Approval 20-Jan-2018 E Rejected


21-Jan-2018 Electrical 1 Approval 24-Jan-2018 E Rejected
Approved w/
17-Jan-2018 Electrical 1 Approval 23-Jan-2018 B comments
22-Jan-2018 Electrical 1 Approval 24-Jan-2018 A Approved

26-Feb-2018 Electrical 1 Approval 28-Feb-2018 E Rejected

29-Nov-2017 HVAC 1 Approval 30-Nov-2017 E Rejected

Approved w/
5-Dec-2017 HVAC 1 Approval 7-Dec-2017 B comments

6-Jan-2018 HVAC 1 Approval 8-Jan-2018 E Rejected

10-Jan-2018 HVAC 1 Approval 16-Jan-2018 E Rejected

17-Jan-2018 HVAC 1 Approval 21-Jan-2018 E Rejected

14-Jan-2018 HVAC 1 Approval 16-Jan-2018 A Appoved

17-Jan-2018 HVAC 1 Approval 21-Jan-2018 E Rejected

22-Jan-2018 HVAC 1 Approval 24-Jan-2018 A Appoved

22-Jan-2018 HVAC 1 Approval 24-Jan-2018 A Appoved

2-Apr-2017 Mechanical 1 Approval 4-Apr-2017 A Approved

10-May-2017 Mechanical 1 Approval 15-May-2017 E Rejected

25-May-2017 Mechanical 1 Approval 27-May-2017 A Approved

10-May-2017 Mechanical 1 Approval 13-May-2017 A Approved

15-May-2017 Mechanical 1 Approval 17-May-2017 E Rejected

Approved w/
3-Jun-2017 Mechanical 1 Approval 4-Jun-2017 B comments

23-May-2017 Mechanical 1 Approval 25-May-2017 A Approved


Approved w/
25-May-2017 Mechanical 1 Approval 27-May-2017 B comments
27-May-2017 Mechanical 1 Approval 28-May-2017 A Approved

28-May-2017 Mechanical 1 Approval 30-May-2017 A Approved

30-May-2017 Mechanical 1 Approval 31-May-2017 A Approved


Approved w/
3-Jun-2017 Mechanical 1 Approval 4-Jun-2017 B comments
10-Jun-2017 Mechanical 1 Approval 12-Jun-2017 A Approved
11-Jun-2017 Mechanical 1 Approval 12-Jun-2017 A Approved

17-Jun-2017 Mechanical 1 Approval 19-Jun-2017 A Approved

12-Jul-2017 Mechanical 1 Approval 15-Jul-2017 E Rejected


25-Jul-2017 Mechanical 1 Approval 27-Jul-2017 E Rejected
6-Aug-2017 Mechanical 1 Approval 8-Aug-2017 A Approved

17-Jul-2017 Mechanical 1 Approval 19-Jul-2017 A Approved

17-Jul-2017 Mechanical 1 Approval 19-Jul-2017 A Approved

17-Jul-2017 Mechanical 1 Approval 19-Jul-2017 E Rejected

20-Jul-2017 Mechanical 1 Approval 23-Jul-2017 A Approved

20-Jul-2017 Mechanical 1 Approval 23-Jul-2017 A Approved

25-Jul-2017 Mechanical 1 Approval 27-Jul-2017 A Approved

25-Jul-2017 Mechanical 1 Approval 27-Jul-2017 A Approved

3-Aug-2017 Mechanical 1 Approval 6-Aug-2017 A Approved

6-Aug-2017 Mechanical 1 Approval 9-Aug-2017 A Approved

8-Aug-2017 Mechanical 1 Approval 10-Aug-2017 A Approved

17-Aug-2017 Mechanical 1 Approval 23-Aug-2017 E Rejected

10-Sep-2017 Mechanical 1 Approval 12-Sep-2017 A Approved

Approved w/
17-Aug-2017 Mechanical 1 Approval 24-Aug-2017 B comments

21-Aug-2017 Mechanical 1 Approval 24-Aug-2017 E Rejected

9-Sep-2017 Mechanical 1 Approval 11-Sep-2017 A Approved

21-Sep-2017 Mechanical 1 Approval 25-Sep-2017 A Approved

3-Oct-2017 Mechanical 1 Approval 5-Oct-2017 A Approved

11-Oct-2017 Mechanical 1 Approval 12-Oct-2017 A Approved


11-Oct-2017 Mechanical 1 Approval 12-Oct-2017 A Approved

12-Oct-2017 Mechanical 1 Approval 14-Oct-2017 A Approved

16-Nov-2017 Mechanical 1 Approval 19-Nov-2017 A Approved

16-Nov-2017 Mechanical 1 Approval 19-Nov-2017 A Approved

16-Nov-2017 Mechanical 1 Approval 19-Nov-2017 A Approved

16-Nov-2017 Mechanical 1 Approval 19-Nov-2017 A Approved

23-Nov-2017 Mechanical 1 Approval 26-Nov-2017 A Approved

25-Nov-2017 Mechanical 1 Approval 27-Nov-2017 A Approved

27-Nov-2017 Mechanical 1 Approval 29-Nov-2017 A Approved

29-Nov-2017 Mechanical 1 Approval 30-Nov-2017 A Approved

29-Nov-2017 Mechanical 1 Approval 30-Nov-2017 A Approved

2-Dec-2017 Mechanical 1 Approval 4-Dec-2017 A Approved


Approved w/
11-Dec-2017 Mechanical 1 Approval 16-Dec-2017 B comments
Approved w/
11-Dec-2017 Mechanical 1 Approval 16-Dec-2017 B comments
25-Dec-2017 Mechanical 1 Approval 27-Dec-2017 A Approved
25-Dec-2017 Mechanical 1 Approval 30-Dec-2017 E Rejected

16-Jan-2018 Mechanical 1 Approval 20-Jan-2018 A Approved

25-Dec-2017 Mechanical 1 Approval 27-Dec-2017 A Approved


25-Dec-2017 Mechanical 1 Approval 27-Dec-2017 A Approved
6-Jan-2018 Mechanical 1 Approval 8-Jan-2018 E Rejected
7-Feb-2018 Mechanical 1 Approval 10-Feb-2018 A Approved
Approved w/
1-Feb-2018 Mechanical 1 Approval 5-Feb-2018 B comments

1-Feb-2018 Mechanical 1 Approval 5-Feb-2018 A Approved

Approved w/
18-Feb-2018 Mechanical 1 Approval 21-Feb-2018 B comments
19-Feb-2018 Mechanical 1 Approval 20-Feb-2018 A Approved

27-Feb-2018 Mechanical 1 Approval

13-Jul-2017 Low Current 1 Approval 18-Jul-2017 E Rejected


Approved w/
8-Oct-2017 Low Current 1 Approval 23-Oct-2017 B comments
Approved w/
20-Aug-2017 Low Current 1 Approval 29-Aug-2017 B comments
16-Jan-2018 Low Current 1 Approval 20-Jan-2018 E Rejected
16-Jan-2018 Low Current 1 Approval 22-Jan-2018 E Rejected
Approved w/
16-Jan-2018 Low Current 1 Approval 22-Jan-2018 B comments
Approved
Approved With Comments
Rejected

REMARKS COMMENTS

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed
Closed

Closed

Closed

Closed
Closed

Closed
Closed
Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed
Closed
Open
Open

Closed

Closed

Closed
Closed
Closed

Closed
Closed

Closed

Closed

Closed

Closed

Closed
Closed

Closed

Closed

Closed
Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed
Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed
Closed

Closed
Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed
Closed

Closed

Closed
Closed
Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed
Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed

Closed
Closed

Closed

Closed
Closed
Closed
Closed

Closed

Closed

Closed

Closed

Open

Closed

Closed

Closed

Closed
Closed

Closed
A Approved

B Approved w/ Comments

C Revise & Resubmit

E Rejected
SUBMITTED FOR RESPONDED AS
SR NO OTHER NO ACTIVITIES / INSPECTION ITEMS SUBMITTED DATE DISCIPLINE DATE RESPONDED INTERNEL REFERENCE NO REMARKS COMMENTS
CODE STATUS CODE STATUS
Revise and
0000 KHEP-WI-OT-001-00 Work Instruction for Documents Numbering 19-Jan-2017 Other 1 Approval 28-Jan-2017 C Resubmit
KHEP-Q-WI-0001 Closed

Approved w/
0000.1 KHEP-WI-OT-001-01 Work Instruction for Documents Numbering 2-Feb-2017 Other 1 Approval 5-Feb-2017 B Comments
KHEP-Q-WI-0001-01 Closed

Approved w/
0000.2 KHEP-WI-OT-001-02 Work Instruction for Documents Numbering 1-Mar-2017 Other 1 Approval 2-Mar-2017 B Comments
KHEP-Q-WI-0001-02 Closed

0001 KHEP-OT-0001-00 Company Profile of Fugro-Suhaimi 15-Jan-2017 Other 1 Approval 26-Jan-2017 C Revise & Resubmit Company Profile Closed
Company Profile of Fugro-Suhaimi / Proposed as Third
0001.1 KHEP-OT-0001-01
Party Testing Laboratory of K H E P
30-Jan-2017 Other 1 Approval 31-Jan-2017 A Approved Company Profile Closed

Approved w/
0002 KHEP-OT-0002-00 Site Mobilization Layout Plan 17-Jan-2017 Other 1 Approval 26-Jan-2017 B Comments
KAUST-C2-SD-001-R0 Closed

0003 KHEP-OT-0003-00 Project Procurement Plan 25-Jan-2017 Other 1 Approval 30-Jan-2017 C Revise & Resubmit KAUST-PROC-001 Closed

0003.1 KHEP-OT-0003-01 Project Procurement Plan 10-Jun-2017 Other 1 Approval 11-Jun-2017 C Revise & Resubmit KAUST-PROC-001-01 Closed

0003.2 KHEP-OT-0003-02 Project Procurement Plan 22-Jul-2017 Other 1 Approval 26-Jul-2017 A Approved KAUST-PROC-001-02 Closed
Approved w/
0004 KHEP-OT-0004-00 Project Quality Plan 17-Jan-2017 Other 1 Approval 24-Jan-2017 B Comments
KAUST-GA-PQP-001-Rev.00 Closed

0005 KHEP-OT-0005-00 Health & Safety Quality Plan 17-Jan-2017 Other 1 Approval 30-Jan-2017 C Revise & Resubmit KAUST-GA-HSE-001-Rev.00 Closed

Approved w/
0005.1 KHEP-OT-0005-01 Health & Safety Plan 1-Feb-2017 Other 1 Approval 7-Feb-2017 B Comments
KAUST-GA-HSE-001-Rev.01 Closed

0006 KHEP-OT-0006-00 Hazard Identification Plan 17-Jan-2017 Other 1 Approval 30-Jan-2017 C Revise & Resubmit KAUST-GA-HIP-001-Rev.00 Closed

Approved w/
0007 KHEP-OT-0007-00 Environmental Management Plan 17-Jan-2017 Other 1 Approval 30-Jan-2017 B Comments
KAUST-GA-EMP-001-Rev.00 Closed

Approved w/
0008 KHEP-OT-0008-00 Project Organizational Chart 25-Jan-2017 Other 1 Approval 9-Mar-2017 B Comments
NA Closed

0008.1 KHEP-OT-0008-01 Project Organizational Chart and CVs 24-Jul-2017 Other 1 Approval 26-Oct-2017 C Revise & Resubmit KHEP-OT-0008-01 Closed

0009 KHEP-OT-0009-00 Emergency Response Plan 1-Feb-2017 Other 1 Approval 7-Feb-2017 A Approved KHEP-OT-HSE-002 Closed
0010 KHEP-OT-0010-00 Risk Assessment for Earth Work and Excavation 1-Feb-2017 Other 1 Approval 7-Feb-2017 A Approved kHEP-RA-003-00 Closed
Risk Assessment for Loading and Unloading of Material
0011 KHEP-OT-0011-00
Manually or with Crane
1-Feb-2017 Other 1 Approval 7-Feb-2017 A Approved kHEP-RA-004-00 Closed

0012 KHEP-OT-0012-00 Risk Assessment for Installation of Chain Link Fence 1-Feb-2017 Other 1 Approval 7-Feb-2017 A Approved kHEP-RA-005-00 Closed
0013 KHEP-OT-0013-00 ITP Schedule 1-Feb-2017 Other 1 Approval 6-Feb-2017 E Rejected KHEP-OT-0013-00 Closed
Approved w/
0013.1 KHEP-OT-0013-01 ITP Schedule 15-Mar-2017 Other 1 Approval 26-Mar-2017 B Comments
KHEP-OT-0013-01 Closed

0013.2 KHEP-OT-0013-02 ITP Schedule 12-Apr-2017 Other 1 Approval 15-Apr-2017 A Approved KHEP-OT-0013-02 Closed
0013.3 KHEP-OT-0013-03 Revised ITP Schedule 8-Jul-2017 Other 1 Approval 13-Jul-2017 A Approved KHEP-OT-0013-02 Closed

0014 KHEP-OT-0014-00 Traffic Management Plan 1-Feb-2017 Other 1 Approval 7-Feb-2017 C Revise & Resubmit KHEP-GA-HSE-002 Closed

Approved w/
0014.1 KHEP-OT-0014-01 Traffic Management Plan 16-Feb-2017 Other 1 Approval 19-Feb-2017 B Comments
KHEP-OT-0014-01 Closed

Approved w/
0015 KHEP-OT-0015-00 CV of Mr. Basim Al Saleem as Safety Manager 16-Feb-2017 Other 1 Approval 19-Feb-2017 B Comments
KHEP-OT-0015-00 Closed

0016 KHEP-OT-0016-00 Shop Drawing Submittal Plan 1-Feb-2017 Other 1 Approval 9-Feb-2017 C Revise & Resubmit KHEP-OT-0016-00 Closed

0017 KHEP-OT-0017-00 Security Plan 16-Feb-2017 Other 1 Approval 19-Feb-2017 A Approved KHEP-OT-0017-00 Closed
Approved w/
0018 KHEP-OT-0018-00 CV of Mr. Hedayatullah Ansari as Safety Supervisor 16-Feb-2017 Other 1 Approval 19-Feb-2017 B Comments
KHEP-OT-0018-00 Closed

0019 KHEP-OT-0019-00 CV of Mr. Lijish John as Safety Supervisor 25-Feb-2017 Other 1 Approval 27-Feb-2017 A Approved KHEP-OT-0019-00 Closed
0020 KHEP-OT-0020-00 KAUST Base Line Schedule (Rev - 00) 08-03-2017 26-03-2017 Other 1 Approval 28-Mar-2017 A Approved KHEP-OT-0020-00 Closed

0020.1 KHEP-OT-0020-01 KAUST Base Line Schedule (Rev - 01) 7-Nov-2017 Other 1 Approval 13-Nov-2017 C Revise & Resubmit KHEP-OT-0020-01 Closed

0020.2 KHEP-OT-0020-02 KAUST Base Line Schedule (Rev - 01) 5-Dec-2017 Other 1 Approval 19-Dec-2017 C Revise & Resubmit KHEP-OT-0020-02 Closed

Approved w/
0020.3 KHEP-OT-0020-03 KAUST Base Line Schedule (Rev - 01) 4-Feb-2018 Other 1 Approval 5-Feb-2018 B Comments
KHEP-OT-0020-03 Closed

0021 KHEP-OT-0021-00 Structural Calculation Sheets 28-Mar-2017 Other 1 Approval 30-Mar-2017 C Revise & Resubmit KHEP-OT-0021-00 Closed

0022 KHEP-OT-0022-00 Progres (Invoice No.01) for the Month of February 2017 30-Mar-2017 Other 1 Approval KHEP-OT-0022-00 Open

Company Profile of Osaimi Engineering Office Proposed As


0023 KHEP-OT-0023-00
Third Testing Laboratory for KHEP
1-Apr-2017 Other 1 Approval 10-Apr-2017 C Revise & Resubmit Company Profile Closed

Company Profile of Osaimi Engineering Office Proposed As


0023.1 KHEP-OT-0023-01
Third Testing Laboratory for KHEP
16-Apr-2017 Other 1 Approval 17-Apr-2017 A Approved KHEP-OT-0023-00 Closed

0024 KHEP-OT-0024-00 Columns Scaffolding Design 1-Apr-2017 Other 1 Approval 5-Apr-2017 C Revise & Resubmit KHEP-OT-0024-00 Closed

COMPANY PROFILE: MAAZ MATERIAL TESTING SERVICES


Approved w/
0025 KHEP-OT-0025-00 (AS THIRD PARTY TESTING LABORATORY OF KAUST 1-Apr-2017 Other 1 Approval 10-Apr-2017 B Comments
KHEP-OT-0025-00 Closed
HOUSING EXPANSION PROJECT)

COMPANY PROFILE: MAAZ MATERIAL TESTING SERVICES


0025.1 KHEP-OT-0025-01 (AS THIRD PARTY TESTING LABORATORY OF KAUST 15-Apr-2017 Other 1 Approval 17-Apr-2017 A Approved KHEP-OT-0025-01 Closed
HOUSING EXPANSION PROJECT)

0026 KHEP-OT-0026-00 GAP Proposal for each cluster 8-Apr-2017 Other 1 Approval 13-Apr-2017 C Revise & Resubmit KHEP-OT-0026-00 Closed

Approved w/
0026.1 KHEP-OT-0026-01 GAP Proposal with table for all cluster 24-Apr-2017 Other 1 Approval 7-May-2017 B Comments
KHEP-OT-0026-01 Closed

CV of Mr. Muhammad Hussain


0027 KHEP-OT-0027-00
as Safety Officer
9-Apr-2017 Other 1 Approval 13-Apr-2017 A Approved KHEP-OT-0027-00 Closed

Formwork & Scaffolding System MANAR AL OMRAN Approved w/


0028 KHEP-OT-0028-00
(Calculations,Plans & Company Profile)
11-Apr-2017 Other 1 Approval 13-Apr-2017 B Comments
KHEP-OT-0028-00 Closed

Formwork & Scaffolding System MANAR AL OMRAN Approved w/


0028.1 KHEP-OT-0028-01
(Calculations,Plans & Company Profile)
27-Apr-2017 Other 1 Approval 9-May-2017 B Comments
KHEP-OT-0028-01 Closed

Approved w/
0029 KHEP-OT-0029-00 Sand Supply: Hamida Hamad Al-Salmi Est 22-Apr-2017 Other 1 Approval 30-Apr-2017 B Comments
KHEP-OT-0029-00 Closed

0030 KHEP-OT-0030-00 CV of Mr. MD Sharique Khan as Safety Officer 26-Apr-2017 Other 1 Approval 30-Apr-2017 A Approved KHEP-OT-0030-00 Closed
0031 KHEP-OT-0031-00 CV of Mr. Ibrahim Khan as Safety Officer 26-Apr-2017 Other 1 Approval 30-Apr-2017 A Approved KHEP-OT-0031-00 Closed
0032 KHEP-OT-0032-00 CV of Mr. Azad Ahmad as Safety Officer 26-Apr-2017 Other 1 Approval 30-Apr-2017 A Approved KHEP-OT-0032-00 Closed
0033 KHEP-OT-0033-00 CV of Mr. Abdullah M. Gubrazli as Safety Officer 1-May-2017 Other 1 Approval 8-May-2017 A Approved KHEP-OT-0033-00 Closed
CV of Mr. Yasser Mohammed Gamal as Civil QC Inspector
0034 KHEP-OT-0034-00
(Concrete Work's)
2-May-2017 Other 1 Approval 9-May-2017 E Rejected KHEP-OT-0034-00 Closed

CV of Eng. Mr. Yasser Mohammed Gamal as Civil QC


0034.1 KHEP-OT-0034-01
Inspector
13-Aug-2017 Other 1 Approval 15-Aug-2017 A Approved KHEP-OT-0034-01 Closed

CV of Mr. Mohammed Yousef Alastal as Civil QC Inspector


0035 KHEP-OT-0035-00
(Earth Work's)
2-May-2017 Other 1 Approval 9-May-2017 E Rejected KHEP-OT-0035-00 Closed

CV of Eng. Mr. Mohammed Yousef Alastal as Civil QC Approved w/


0035.1 KHEP-OT-0035-01
Inspector
13-Aug-2017 Other 1 Approval 15-Aug-2017 B Comments
KHEP-OT-0035-01 Closed

Company Profile-(Pre-Qualification) Falconviz for 3D


Approved w/
0036 KHEP-OT-0036-00 Surveying & Mapping 13-May-2017 Other 1 Approval 24-May-2017 B Comments
KHEP-OT-0036-00 Closed
Kaust Vendor # 10100985
0037 KHEP-OT-0037-00 Progress (Invoice No.02) for the Month of April 2017 16-May-2017 Other 1 Approval 15-Aug-2017 A Approved KHEP-OT-0037-00 Closed
CV of Mr. Muhammad Akram
0038 KHEP-OT-0038-00
as Safety Officer
5-Jun-2017 Other 1 Approval 11-Jun-2017 C Revise & Resubmit KHEP-OT-0038-00 Closed

CV of Mr. Muhammad Athar Iqbal


0039 KHEP-OT-0039-00
as Safety Officer
5-Jun-2017 Other 1 Approval 11-Jun-2017 C Revise & Resubmit KHEP-OT-0039-00 Closed

Company Prequalification United Technology of Electric


0040 KHEP-OT-0040-00
Substation & Switchgears Co. ( USSG)
5-Jun-2017 Other 1 Approval 13-Jun-2017 E Rejected KHEP-OT-0040-00 Closed

Company Prequalification - United


Approved w/
0040.1 KHEP-OT-0040-01 Technology of Electric Substation & Switchgears Co. 17-Oct-2017 Other 1 Approval 25-Oct-2017 B Comments
KHEP-OT-0040-01 Closed
( USSG)
Company Prequalification Al Approved w/
0041 KHEP-OT-0041-00
Abdulkarim Holding Co
12-Jun-2017 Other 1 Approval 15-Jun-2017 B Comments
KHEP-OT-0041-00 Closed
FORM WORK AND SCAFFOLDING SYSTEM
MANAR AL OMRAN
0042 KHEP-OT-0042-00 BC4 FORMWORK AND SCAFFOLDING PLANS OF 17-Jun-2017 Other 2 Information KHEP-OT-0028-00 Open
COLUMNS, SLAB AND BEAMS
FORM WORK AND SCAFFOLDING SYSTEM
MANAR AL OMRAN
0043 KHEP-OT-0043-00 BC6 FORMWORK AND SCAFFOLDING PLANS OF 17-Jun-2017 Other 2 Information KHEP-OT-0028-00 Open
COLUMNS, SLAB AND BEAMS

0044 KHEP-OT-0044-00 Progress (Invoice No.03) for the Month of May 2017 6-Jul-2017 Other 1 Approval 8-Jul-2017 A Approved KHEP-OT-0044-00 Closed
Approved w/
0045 KHEP-OT-0045-00 Pre Qualification Modern Times Technical System / Rheem 20-Jul-2017 Other 1 Approval 27-Jul-2017 B Comments
KHEP-OT-0045-00 Closed

Company Pre Qualification -Al


Approved w/
0046 KHEP-OT-0046-00 Fanar Electrical Systems 22-Jul-2017 Other 1 Approval 3-Aug-2017 B Comments
KHEP-OT-0046-00 Closed
Manufacturer of Cables & Wires
Company Pre Qualification -Al
0047 KHEP-OT-0047-00 Fanar Electrical Systems 22-Jul-2017 Other 1 Approval 11-Sep-2017 E Rejected KHEP-OT-0047-00 Closed
Manufacturer of Package Substation
MOTS / Schneider - Addendum Document (Requested by
0048 KHEP-OT-0048-00 Client During Factory Visit) Ref: KHEP-MS-EL- 23-Jul-2017 Other 1 Approval 1-Aug-2017 C Revise & Resubmit KHEP-OT-0048-00 Closed
0028-00
MOTS / Schneider - Addendum Document (Requested by
Approved w/
0048-01 KHEP-OT-0048-01 Client During Factory Visit) Ref: KHEP-MS-EL- 11-Sep-2017 Other 1 Approval 27-Sep-2017 B Comments
KHEP-OT-0048-01 Closed
0028-00
Al Fanar - Addendum Document
0049 KHEP-OT-0049-00 (Requested by Client During Factory Visit) 23-Jul-2017 Other 1 Approval 1-Aug-2017 C Revise & Resubmit KHEP-OT-0049-00 Closed
Ref: KHEP-MS-El-0036-00
Al Fanar - Addendum Document
Approved w/
0049-1 KHEP-OT-0049-01 (Requested by Client During Factory Visit) 11-Sep-2017 Other 1 Approval 27-Sep-2017 B Comments
KHEP-OT-0049-01 Closed
Ref: KHEP-MS-El-0036-00
Changing Company Name from DYLAN to be KAHA Refer :
0050 KHEP-OT-0050-00 23-Jul-2017 Other 2 Information KHEP-OT-0050-00 Open
KHEP-MS-ME-0008-00
Pre- Qualification Dallah Trading Company / Trane for Approved w/
0051 KHEP-OT-0051-00
HVAC System (VRF)
26-Jul-2017 Other 1 Approval 3-Aug-2017 B Comments
KHEP-OT-0051-00 Closed

0052 KHEP-OT-0052-00 Progress (Invoice No.04) for the Month of June 2017 29-Jul-2017 Other 1 Approval 30-Jul-2017 A Approved KHEP-OT-0052-00 Closed

Company Pre Qualification - Bahra Cable Manufacturer of


0053 KHEP-OT-0053-00
LV Cables & Wires
31-Jul-2017 Other 1 Approval 3-Aug-2017 A Approved KHEP-OT-0053-00 Closed

Company Pre Qualification - Contactum / Al Fanar Approved w/


0054 KHEP-OT-0054-00
Manufacturer of Wiring Devices
31-Jul-2017 Other 1 Approval 9-Aug-2017 B Comments
KHEP-OT-0054-00 Closed

Saudi Power tech - Addendum Document


0055 KHEP-OT-0055-00 (Requested by Client During Factory Visit) 31-Jul-2017 Other 1 Approval 1-Aug-2017 C Revise & Resubmit KHEP-OT-0055-00 Closed
Ref: KHEP-MS-EL-0025-00
Saudi Power tech - Addendum Document
Approved w/
0055.1 KHEP-OT-0055-01 (Requested by Client During Factory Visit) 11-Sep-2017 Other 1 Approval 27-Sep-2017 B Comments
KHEP-OT-0055-01 Closed
Ref: KHEP-MS-EL-0025-00
Company Pre Qualification / Manufacturer - Valve
Approved w/
0056 KHEP-OT-0056-00 (Plumbing - Water) 31-Jul-2017 Other 1 Approval 3-Aug-2017 B Comments
KHEP-OT-0056-00 Closed
Hattersley
Company Pre Qualification -
0057 KHEP-OT-0057-00 HARCO Group 6-Aug-2017 Other 1 Approval 9-Aug-2017 E Rejected KHEP-OT-0057-00 Closed
Manufacturer of CCTV
Mechanical Hydraulic Calculation for Portable water Fire
0058 KHEP-OT-0058-00
Fightings (Tie in Point)
6-Aug-2017 Other 1 Approval 15-Aug-2017 C Revise & Resubmit KHEP-OT-0058-00 Closed

0059 KHEP-OT-0059-00 CASTING YARD FOR PRE-CAST MANHOLES 9-Aug-2017 Other 1 Approval Recalled KHEP-OT-0059-00 Closed
Company Pre Qualification -
0060 KHEP-OT-0060-00 (STC) The Saudi Transformers co. Ltd 10-Aug-2017 Other 1 Approval 11-Sep-2017 E Rejected KHEP-OT-0060-00 Closed

Company Pre Qualification - Approved w/


0061 KHEP-OT-0061-00
META Switchgear Co.
10-Aug-2017 Other 1 Approval 29-Aug-2017 B Comments
KHEP-OT-0061-00 Closed

Exhaust Fans
Approved w/
0062 KHEP-OT-0062-00 Manufacturers: Maico 13-Aug-2017 Other 1 Approval 15-Aug-2017 B Comments
KHEP-OT-0062-00 Closed
(Danyair/Elient) Exhaust fans
Company Pre Qualification -
0063 KHEP-OT-0063-00 Edison / Intreplast Co.Ltd. 13-Aug-2017 Other 1 Approval 15-Aug-2017 E Rejected KHEP-OT-0063-00 Closed
0064 KHEP-OT-0064-00 CV of Eng. Jul-Amin Radi Abdurajid as Civil QC Inspector 13-Aug-2017 Other 1 Approval 13-Aug-2017 A Approved KHEP-OT-0064-00 Closed

Approved w/
0065 KHEP-OT-0065-00 CV of Eng. Jimmuel N.Mendoza as Electrical QC Inspector 13-Aug-2017 Other 1 Approval 20-Aug-2017 B Comments
KHEP-OT-0065-00 Closed

Request for Approving companies to Supplement Al-


Approved w/
0066 KHEP-OT-0066-00 Bawani workforces in Zone 2B,3B and 4B 17-Aug-2017 Other 1 Approval 20-Aug-2017 B Comments
KHEP-OT-0066-00 Closed
Company Name: Aswar Al Dar
Request for Approving companies to Supplement Al-
Bawani workforces in Zone 2B,3B and 4B Approved w/
0067 KHEP-OT-0067-00
Company Name: Nucleus Construction
17-Aug-2017 Other 1 Approval 20-Aug-2017 B Comments
KHEP-OT-0067-00 Closed
Company
Request for Approving companies to Supplement Al-
Approved w/
0068 KHEP-OT-0068-00 Bawani workforces in Zone 2B,3B and 4B 17-Aug-2017 Other 1 Approval 20-Aug-2017 B Comments
KHEP-OT-0068-00 Closed
Company Name: Setraa

Request for Approving companies to Supplement Al-


Approved w/
0069 KHEP-OT-0069-00 Bawani workforces in Zone 2B,3B and 4B 17-Aug-2017 Other 1 Approval 20-Aug-2017 B Comments
KHEP-OT-0069-00 Closed
Company Name: Arabian Construction House

Request for Approving companies to Supplement Al-


Bawani workforces in Zone 2B,3B and 4B Approved w/
0070 KHEP-OT-0070-00
Company Name: Applied
17-Aug-2017 Other 1 Approval 24-Aug-2017 B Comments
KHEP-OT-0070-00 Closed
Construction Est.
Company Pre Qualification - Al Tamam
Modern Plastic Factory Manufacture of :
0071 KHEP-OT-0071-00
uPVC, PVC, HDPE Conduit
20-Aug-2017 Other 1 Approval 26-Aug-2017 E Rejected KHEP-OT-0071-00 Closed

Company Pre Qualification for Goden Paradise Est For All


0072 KHEP-OT-0072-00
Szes of Aggregate
23-Aug-2017 Other 1 Approval 26-Aug-2017 C Revise & Resubmit KHEP-OT-0072-00 Closed
Pre Qualification for Goden Paradise Est
0072.1 KHEP-OT-0072-01 5-Oct-2017 Other 1 Approval 9-Oct-2017 A Approved KHEP-OT-0072-01 Closed

0073 KHEP-OT-0073-00 Specifications, KAUST Housing Expansion Project, PHASE 1 24-Aug-2017 Other 2 Information KHEP-OT-0073-00 Open

0074 KHEP-OT-0074-00 CV of Eng. Cesar A.Andes as Civil QC 28-Aug-2017 Other 1 Approval 29-Aug-2017 A Approved KHEP-OT-0074-00 Closed

0075 KHEP-OT-0075-00 CV of Eng. Alfredo Dorotayo Balido Jr.as Architectural QC 28-Aug-2017 Other 1 Approval 29-Aug-2017 A Approved KHEP-OT-0075-00 Closed

0076 KHEP-OT-0076-00 Progress (Invoice No.05) for the Month of July 2017 29-Aug-2017 Other 1 Approval 30-Aug-2017 A Approved KHEP-OT-0076-00 Closed
Company Pre Qualification META SWITCH GEAR Co.
0077 KHEP-OT-0077-00 Manufacturer 30-Aug-2017 Other 1 Approval 13-Sep-2017 C Revise & Resubmit KHEP-OT-0077-00 Closed
of: Electric Meter
CV of Mr. Mohammad Arif
0078 KHEP-OT-0078-00 as Safety Supervisor 12-Sep-2017 Other 1 Approval 26-Sep-2017 C Revise & Resubmit KHEP-OT-0078-00 Closed

CV of Mr. Sheeraz Farooq


0079 KHEP-OT-0079-00 as Safety Supervisor 12-Sep-2017 Other 1 Approval 26-Sep-2017 C Revise & Resubmit KHEP-OT-0079-00 Closed

CV of Mr. Ghulam Murtaza


0080 KHEP-OT-0080-00 as Safety Officer 12-Sep-2017 Other 1 Approval 26-Sep-2017 C Revise & Resubmit KHEP-OT-0080-00 Closed

CV of Mr. Iqrar Husain


0081 KHEP-OT-0081-00 as Safety Officer 12-Sep-2017 Other 1 Approval 26-Sep-2017 C Revise & Resubmit KHEP-OT-0081-00 Closed

Company Prequalification BAHRA Cabels Company


Approved w/
0082 KHEP-OT-0082-00 Manufacturer of: 17-Sep-2017 Other 1 Approval 19-Sep-2017 B Comments
KHEP-OT-0082-00 Closed
PVC Conduit, Fittings & Accessories

CV of Mr. Mohammad Quaish Alam as


0083 KHEP-OT-0083-00 Safety Officer 17-Sep-2017 Other 1 Approval 26-Sep-2017 C Revise & Resubmit KHEP-OT-0083-00 Closed

CV of Mr. Mohammad Quaish Alam as


0083.1 KHEP-OT-0083-01 Safety Officer 5-Oct-2017 Other 1 Approval 9-Oct-2017 A Approved KHEP-OT-0083-01 Closed

CV. Of Eng. Ahamed Ashour El Samanoudy as Construction Approved w/


0084 KHEP-OT-0084-00
Manager
19-Sep-2017 Other 1 Approval 17-Oct-2017 B Comments
KHEP-OT-0084-00 Closed

Company Prequalification Contactum / Al


Approved w/
0085 KHEP-OT-0085-00 Fanar Manufacturer of wiring devices ASPIRE 20-Sep-2017 Other 1 Approval 30-Sep-2017 B Comments
KHEP-OT-0085-00 Closed
Range
0086 KHEP-OT-0086-00 Calibration Certificate 21-Sep-2017 Other 2 Information 26-Sep-2017 C Revise & Resubmit KHEP-OT-0086-00 Closed

0086.1 KHEP-OT-0086-01 Calibration Certificate 4-Nov-2017 Other 1 Approval 6-Nov-2017 A Approved KHEP-OT-0086-01 Closed
CV of Mr. RAMDIE I.DIAZ
Approved w/
0087 KHEP-OT-0087-00 as Safety Officer 2-Oct-2017 Other 1 Approval 3-Oct-2017 B Comments
KHEP-OT-0087-00 Closed

CV of Mr. CECILIO LLANTO JUAREZ


0088 KHEP-OT-0088-00 as Safety Officer 2-Oct-2017 Other 1 Approval 3-Oct-2017 A Approved KHEP-OT-0088-00 Closed

CV of Eng. Mark Gerard C.Neon


0089 KHEP-OT-0089-00 as QC Engineer - Civil 2-Oct-2017 Other 1 Approval 3-Oct-2017 A Approved KHEP-OT-0089-00 Closed

CV of Eng. Asim Ali


0090 KHEP-OT-0090-00 as QA Manager 2-Oct-2017 Other 1 Approval 11-Oct-2017 E Rejected KHEP-OT-0090-00 Closed

CV of Eng. Riaz Ahmed


Approved w/
0091 KHEP-OT-0091-00 as QC Engineer - Civil / Structural 2-Oct-2017 Other 1 Approval 3-Oct-2017 B Comments
KHEP-OT-0091-00 Closed

0092 KHEP-OT-0092-00 Progress (Invoice No.06) for the Month of August 2017 3-Oct-2017 Other 1 Approval 4-Oct-2017 C Revise & Resubmit KHEP-OT-0092-00 Closed

0092.1 KHEP-OT-0092-01 Progress (Invoice No.06) for the Month of August 2017 15-Oct-2017 Other 1 Approval 25-Oct-2017 C Revise & Resubmit KHEP-OT-0092-01 Closed

0092.2 KHEP-OT-0092-02 Progress (Invoice No.06) for the Month of August 2017 25-Oct-2017 Other 1 Approval 5-Nov-2017 A Approved KHEP-OT-0092-02 Closed

0093 KHEP-OT-0093-00 PLUMBING, Electrical water Heater Sizing Calculation 3-Oct-2017 Other 2 Information 23-Oct-2017 C Revise & Resubmit KHEP-OT-0093-00 Closed

Central Electric water heater sizing calculation for All


0093.1 KHEP-OT-0093-01 16-Dec-2017 Other 2 Information KHEP-OT-0093-01 Open
Cluster
Mechanical, HVAC Load Calculations DX-Vrf System
0094 KHEP-OT-0094-00 3-Oct-2017 Other 2 Information KHEP-OT-0094-00 Open
Building Type - A6
Mechanical, HVAC Load Calculations DX-Vrf System
0095 KHEP-OT-0095-00 5-Oct-2017 Other 2 Information KHEP-OT-0095-00 Open
Building Type - Villa A, Type B2
Mechanical, HVAC Load Calculations DX-Vrf System
0095.1 KHEP-OT-0095-01 13-Nov-2017 Other 2 Information KHEP-OT-0095-01 Open
Building Type - Villa A, Type B2

Pre Qualification for SAAD Areemat S.AL-Moulad EST.


0096 KHEP-OT-0096-00
Supplier for Marl, Baes course Material and Angular Rocks
5-Oct-2017 Other 1 Approval 9-Oct-2017 A Approved KHEP-OT-0096-00 Closed

CV of Eng. Elpidio Barnard O. Marquez


0097 KHEP-OT-0097-00 as QC Mechanical 7-Oct-2017 Other 1 Approval 11-Oct-2017 A Approved KHEP-OT-0097-00 Closed

CV of Eng. Mohammed Osman as QC


0098 KHEP-OT-0098-00 Mechanical 10-Oct-2017 Other 1 Approval 12-Oct-2017 A Approved KHEP-OT-0098-00 Closed

Value Engineering Proposal for - FRESH


AIR PACKAGE UNIT (Calculation for Clusters
0099 KHEP-OT-0099-00 10-Oct-2017 Other 2 Information KHEP-OT-0099-00 Open
- The Condensate Trap Size
Calculation
External Hydraulic Calculation (Attached: Approved w/
0100 KHEP-OT-0100-00
Soft copy + A0 Sheet)
12-Oct-2017 Other 1 Approval 18-Oct-2017 B Comments
KHEP-OT-0100-00 Closed

Gedac Panel Board


Addendum Document
0101 KHEP-OT-0101-00 19-Oct-2017 Other 2 Information KHEP-OT-0101-00 Open
(Requested by Client During Factory Visit) as per
comment # 3 of KHEP-MS-EL-0051-00
Sample - MCCB & MCB - For Al Fanar Low Voltage Panel
0102 KHEP-OT-0102-00
Board
23-Oct-2017 Other 1 Approval 4-Nov-2017 C Revise & Resubmit KHEP-OT-0102-00 Closed

CV of Mr. HENRY M.SERRATO


Approved w/
0103 KHEP-OT-0103-00 as Planning Engineer 24-Oct-2017 Other 1 Approval 5-Nov-2017 B Comments
KHEP-OT-0103-00 Closed

Company Pre Qualification: Al Zamil (SSP-OZG-Wheatland)


0104 KHEP-OT-0104-00
for Coated Rigid steel Conduit & Fittings
28-Oct-2017 Other 1 Approval 12-Dec-2017 A Approved KHEP-OT-0104-00 Closed

Company Pre Qualification: Ercon Middle East Industries


0105 KHEP-OT-0105-00
Saudia Co. For Pullbox
28-Oct-2017 Other 1 Approval 7-Nov-2017 A Approved KHEP-OT-0105-00 Closed
01. Civil Third Party Test Report Concrete Works-Jan 2017
to May 2017
0106 KHEP-OT-0106-00 02. Civil Third Party Test Report Earth Works-Jan 2017 to 4-Jan-2018 Other 1 Approval KHEP-OT-0106-00 Open
April 2017
03. Civil Third Party Test Report May 2017 to Jun 2017

0107 KHEP-OT-0107-00 LV SINGLE LINE DIAGRAM SHEET 1 to 18 1-Nov-2017 Other 1 Approval 14-Nov-2017 C Revise & Resubmit 1356DF-E-EG-101 to 118 Closed

Approved w/
0108 KHEP-OT-0108-00 Internal Fire Fighting Hydraulic Calculation 1-Nov-2017 Other 1 Approval 13-Nov-2017 B Comments
KHEP-OT-0108-00 Closed

KHEP-OT-0109-00 Related
Sample - Light Fixtures - GE /
Document: 1. KHEP-
0109 KHEP-OT-0109-00 Trilux / Bega / Jiso / Goccia 6-Nov-2017 Other 1 Approval 25-Nov-2017 C Revise & Resubmit
MS-EL-0020-02
Closed
Vendor : HRFA
2. KHEP-MS-EL-0020-03

KHEP-RIFC-HVAC-B2-DW-GF-001
0110 KHEP-OT-0110-00 B2 First Floor, Ground Floor, Roof Floor Ducting Layout 1-Nov-2017 Other 1 Approval 7-Nov-2017 C Revise & Resubmit KHEP-RIFC-HVAC-B2-DW-GF-003 Closed
KHEP-RIFC-HVAC-B2-DW-GF-005

Cluster B2, HVAC Ducting Layout and Ventilation Riser Approved w/


0110.1 KHEP-OT-0110-01
Diagram
20-Nov-2017 Other 1 Approval 29-Nov-2017 B comments
Closed Closed

Pre Qualification for AL MERFAA Supplier


0111 KHEP-OT-0111-00
for Road Signages
4-Nov-2017 Other 1 Approval 6-Nov-2017 C Revise & Resubmit KHEP-OT-0111-00 Closed

Pre Qualification for AL MERFAA Supplier Approved w/


0111.1 KHEP-OT-0111-01
for Road Signages
7-Dec-2017 Other 1 Approval 11-Dec-2017 B Comments
KHEP-OT-0111-01 Closed

Pre Qualification for FARIS GROUP Approved w/


0112 KHEP-OT-0112-00
Supplier for Artificial Grass
4-Nov-2017 Other 1 Approval 11-Nov-2017 B Comments
KHEP-OT-0111-00 Closed

KHEP-RIFC-HVAC-A6-DW-GF-001
Cluster A6 HVAC Ducting Layout Ground & First, Roof Floor
0113 KHEP-OT-0113-00 5-Nov-2017 Other 1 Approval 12-Nov-2017 C Revise & Resubmit KHEP-RIFC-HVAC-A6-DW-GF-003 Closed
KHEP-RIFC-HVAC-A6-DW-GF-005

KHEP-RIFC-HVAC-A6-DW-GF-001
CLUSTER A6, HVAC DUCTING LAYOUT AND VENTILATION
Approved w/ KHEP-RIFC-HVAC-A6-DW-GF-003
0113.1 KHEP-OT-0113-01 RISER DIAGRAM Ground & First, Roof Floor & Ducting 22-Nov-2017 Other 1 Approval 3-Dec-2017 B Comments KHEP-RIFC-HVAC-A6-DW-GF-005
Closed
layout and Ventilation Riser Diagram
KHEP-RIFC-HVAC-A6-DW-RD-007

0114 KHEP-OT-0114-00 Progress (Invoice No.07) for the Month of September 2017 6-Nov-2017 Other 1 Approval 11-Nov-2017 C Revise & Resubmit KHEP-OT-0114-00 Closed

0114.1 KHEP-OT-0114-01 Progress (Invoice No.07) for the Month of September 2017 20-Nov-2017 Other 1 Approval 23-Nov-2017 A Approved KHEP-OT-0114-01 Closed

Company Prequalification ORCA - ORCA Trading Est for


0115 KHEP-OT-0115-00
Staircase & Balcony Aluminum railings
7-Nov-2017 Other 1 Approval 11-Nov-2017 C Revise & Resubmit KHEP-OT-0115-00 Closed

Company Prequalification NAFCO - National Powder Approved w/


0116 KHEP-OT-0116-00
Coating Factory for Metal & Aluminum Powder coating
9-Nov-2017 Other 1 Approval 29-Nov-2017 B Comments
KHEP-OT-0116-00 Closed

Appointment of Eng. Ahamed M. Darbi as Technical Approved w/


0117 KHEP-OT-0117-00
manager
13-Nov-2017 Other 1 Approval 24-Dec-2017 B Comments
KHEP-OT-0117-00 Closed

Pre Qualification for Arabian Tile Company (Artic)


Manufacturer and Approved w/
0118 KHEP-OT-0118-00
Supplier for Precast Interlocking Pavers, Kerbstones,
16-Nov-2017 Other 1 Approval 22-Nov-2017 B Comments
KHEP-OT-0118-00 Closed
Concrete Tiles Site Furnishings
CV of Eng. Emad Fouad Ismail as Civil QC
0119 KHEP-OT-0119-00 Inspector 20-Nov-2017 Other 1 Approval 26-Nov-2017 C Revise & Resubmit KHEP-OT-0119-00 Closed

CV of Eng. Emad Fouad Ismail as Civil QC


0119.1 KHEP-OT-0119-01 Inspector 18-Dec-2017 Other 1 Approval 25-Dec-2017 A Approved KHEP-OT-0119-01 Closed

0120 KHEP-OT-0120-00 RFI Log Summary " August 2017" 20-Nov-2017 Other 1 Approval KHEP-OT-0120-00 Open

KHEP-RIFC-PL-WS-B2-GF-001
Approved w/
0121 KHEP-OT-0121-00 Cluster B2 Ground , First & Roof Floor Water Supply Layout 20-Nov-2017 Other 1 Approval 23-Nov-2017 B Comments
KHEP-RIFC-PL-WS-B2-FF-002 Closed
KHEP-RIFC-PL-WS-B2-RF-003

MECHANICAL HVAC Load Calculation DX-VRF System


0122 KHEP-OT-0122-00 23-Nov-2017 Other 2 Information KHEP-OT-0122-00 Open
Multipurpose Hall
CV of Mr. Mark Gil Macasaquit Cunanan
0123 KHEP-OT-0123-00 as Safety Officer 23-Nov-2017 Other 1 Approval 29-Nov-2017 A Approved KHEP-OT-0123-00 Closed

CV of Mr. Eric Miano Reyes


0124 KHEP-OT-0124-00 as Safety Officer 23-Nov-2017 Other 1 Approval 29-Nov-2017 C Revise & Resubmit KHEP-OT-0124-00 Closed

CV of Mr. Eric Miano Reyes


Approved w/
0124.1 KHEP-OT-0124-01 as Safety Officer 5-Dec-2017 Other 1 Approval 11-Dec-2017 B Comments
KHEP-OT-0124-01 Closed

CV of Mr. Mohammad Mustafa Mheealdeen


Approved w/
0125 KHEP-OT-0125-00 as Safety Officer 23-Nov-2017 Other 1 Approval 29-Nov-2017 B Comments
KHEP-OT-0125-00 Closed

Approved w/
0126 KHEP-OT-0126-00 CV of Mr. Nabil Musa Awwad Post of Procurement Manager 23-Nov-2017 Other 1 Approval 24-Dec-2017 B Comments
KHEP-OT-0126-00 Closed

CV of Eng. Anselmo A.Badato Jr. as QA/QC Electrical


0127 KHEP-OT-0127-00
Inspector
27-Nov-2017 Other 1 Approval 5-Dec-2017 A Approved KHEP-OT-0127-00 Closed

KHEP-RIFC-ME-DR-B2-GF-001
Approved w/
0128 KHEP-OT-0128-00 Cluster B2 Ground , First & Roof Floor Drainage Layout 2-Dec-2017 Other 1 Approval 7-Dec-2017 B Comments
KHEP-RIFC-ME-DR-B2-FF-002 Closed
KHEP-RIFC-ME-DR-B2-RF-003

CV of Mr. Abdullah Shafique


Approved w/
0129 KHEP-OT-0129-00 as Safety Officer 4-Dec-2017 Other 1 Approval 11-Dec-2017 B Comments
KHEP-OT-0129-00 Closed

KHEP-RIFC-ME-DR-A6-GF-001
Approved w/
0130 KHEP-OT-0130-00 Cluster A6 Ground , First & Roof Floor Drainage Layout 4-Dec-2017 Other 1 Approval 13-Dec-2017 B Comments
KHEP-RIFC-ME-DR-A6-FF-002 Closed
KHEP-RIFC-ME-DR-A6-RF-003

KHEP-RIFC-PL-WS-A6-GF-001
KHEP-RIFC-PL-WS-A6-FF-002
Approved w/
0131 KHEP-OT-0131-00 Cluster A6 Ground , First & Roof Floor Water Supply Layout 4-Dec-2017 Other 1 Approval 16-Dec-2017 B Comments
KHEP-RIFC-PL-WS-A6-RF-003 Closed
KHEP-RIFC-PL-A6-WS-RD-004

Approved w/
0132 KHEP-OT-0132-00 Sample - Low voltage Cable & Single core wires - LS0H 5-Dec-2017 Other 1 Approval 1-Jan-2018 B Comments
KHEP-OT-0132-00 Closed

CV of Mr. Mohammad Arif Khan


Approved w/
0133 KHEP-OT-0133-00 as Safety Officer 5-Dec-2017 Other 1 Approval 11-Dec-2017 B Comments
KHEP-OT-0133-00 Closed

0134 KHEP-OT-0134-00 Progress (Invoice No.08) for the Month of October 2017 11-Dec-2017 Other 1 Approval 12-Dec-2017 A Approved KHEP-OT-0134-00 Closed

Approved w/
0135 KHEP-OT-0135-00 Cv of Eng Asim Ali as Assistant QA Manager 17-Dec-2017 Other 1 Approval 25-Dec-2017 B Comments
KHEP-OT-0135-00 Closed

KHEP-RIFC-HVAC-BC6-DW-GF-
001
CLUSTER BC6, HVAC DUCTING LAYOUT - Ground floor, Approved w/ KHEP-RIFC-HVAC-BC6-DW-FF-
0136 KHEP-OT-0136-00
First floor, Roof floor Ducting layout
18-Dec-2017 Other 1 Approval 23-Dec-2017 B Comments 003
Closed
KHEP-RIFC-HVAC-BC6-DW-RF-
005
KHEP-RIFC-HVAC-BC4-DW-GF-
001
CLUSTER BC4, HVAC DUCTING LAYOUT - Ground floor, Approved w/ KHEP-RIFC-HVAC-BC4-DW-FF-
0137 KHEP-OT-0137-00
First floor, Roof floor Ducting layout
18-Dec-2017 Other 1 Approval 23-Dec-2017 B Comments 003
Closed
KHEP-RIFC-HVAC-BC4-DW-RF-
005
Cluster Type B2 - Internal Fire Fighting Hydraulic
0138 KHEP-OT-0138-00
Calculation
23-Dec-2017 Other 1 Approval 27-Dec-2017 A Approved KHEP-OT-0138-00 Closed

Approved w/
0139 KHEP-OT-0139-00 Cluster B2 - Schematic Riser Diagram Water Suply 23-Dec-2017 Other 1 Approval 1-Jan-2018 B Comments
KHEP-RIFC-PL-B2-WS-RD-004 Closed

Approved w/
0140 KHEP-OT-0140-00 CV of Nadeem Aftab as Safety Officer 24-Dec-2017 Other 1 Approval 1-Jan-2018 B Comments
KHEP-OT-0140-00 Closed

Company Prequalification - CCCI Consultant Creative forr Approved w/


0141 KHEP-OT-0141-00
Construction IND
28-Dec-2017 Other 1 Approval 11-Jan-2018 B Comments
KHEP-OT-0141-00 Closed
KHEP-RIFC-PL-BC6-WS-GF-001
KHEP-RIFC-PL-BC6-WS-FF-002
Cluster BC6 Water Supply Layout Ground Floor First Floor
0142 KHEP-OT-0142-00
Roof Floor & Water Supply Raiser Diagram
31-Dec-2017 Other 1 Approval 6-Jan-2018 C Revise & Resubmit KHEP-RIFC-PL-BC6-WS-RF-003 Closed
KHEP-RIFC-PL-BC6-WS-RD-004

KHEP-RIFC-PL-BC4-WS-GF-001
KHEP-RIFC-PL-BC4-WS-FF-002
Cluster BC4 Water Supply Layout Ground Floor First Floor
0143 KHEP-OT-0143-00
Roof Floor & Water Supply Raiser Diagram
31-Dec-2017 Other 1 Approval 6-Jan-2018 C Revise & Resubmit KHEP-RIFC-PL-BC4-WS-RF-003 Closed
KHEP-RIFC-PL-BC4-WS-RD-004

KHEP-RIFC-PL-A4-WS-GF-001
KHEP-RIFC-PL-A4-WS-FF-002
Cluster A4 Water Supply Layout Ground Floor First Floor
0144 KHEP-OT-0144-00
Roof Floor & Water Supply Raiser Diagram
31-Dec-2017 Other 1 Approval 6-Jan-2018 C Revise & Resubmit KHEP-RIFC-PL-A4-WS-RF-003 Closed
KHEP-RIFC-PL-A4-WS-RD-004

Approved w/
0145 KHEP-OT-0145-00 CV of Umar Hayat as Safety Officer 2-Jan-2018 Other 1 Approval 20-Jan-2018 B Comments
KHEP-OT-0145-00 Closed

0146 KHEP-OT-0146-00 Company Pre Qualification - Beauty Design Company 2-Jan-2018 Other 1 Approval 11-Jan-2018 C Revise & Resubmit KHEP-OT-0146-00 Closed

0147 KHEP-OT-0147-00 Progress (Invoice No.09) for the Month of November 2017 2-Jan-2018 Other 1 Approval 3-Jan-2018 A Approved KHEP-OT-0147-00 Closed

Cluster A4 HVAC Ducting Layout & Ventilation Riser Approved w/


0148 KHEP-OT-0148-00
Diagram
3-Jan-2018 HVAC 1 Approval 9-Jan-2018 B Comments
KHEP-OT-0148-00 Closed

KHEP-RIFC-HVAC-B2-PW-GF-002
KHEP-RIFC-HVAC-B2-PW-FF-004
0149 KHEP-OT-0149-00 Cluster B2 Refrigerant Piping 3-Jan-2018 HVAC 1 Approval 9-Jan-2018 C Revise & Resubmit
KHEP-RIFC-HVAC-B2-PW-RD-008
Closed

Approved w/
0150 KHEP-OT-0150-00 CV of Adnan Hassan as Project Control Manager 4-Jan-2018 Other 1 Approval 9-Jan-2018 B Comments
KHEP-OT-0150-00 Closed

0151 KHEP-OT-0151-00 Cluster BC4 HVAC Riser Diagram 7-Jan-2018 HVAC 1 Approval 11-Jan-2018 A Approved KHEP-OT-0151-00 Closed
0152 KHEP-OT-0152-00 Cluster BC6 HVAC Riser Diagram 7-Jan-2018 HVAC 1 Approval 11-Jan-2018 A Approved KHEP-OT-0152-00 Closed
0153 KHEP-OT-0153-00 Calculation for Korean Scaffolding System 7-Jan-2018 Structural 1 Approval 11-Jan-2018 E Rejected KHEP-OT-0153-00 Closed
0153.1 KHEP-OT-0153-01 Calculation Light Duty Scaffolding System 27-Feb-2018 Structural 1 Approval KHEP-OT-0153-01 Open

0154 KHEP-OT-0154-00 AL Jawdah Ceramics Company Pre Qualification 7-Jan-2018 Architectural 1 Approval 15-Jan-2018 C Revise & Resubmit KHEP-OT-0154-00 Closed

Approved w/
0155 KHEP-OT-0155-00 CV of Eng Clemente A. Regilme as QC Mechanical 7-Jan-2018 Other 1 Approval 15-Jan-2018 B Comments
KHEP-OT-0155-00 Closed

Cluster Type BC6 - C80 Internal Fire Fighting Hydraulic


0156 KHEP-OT-0156-00
Calculation
13-Jan-2018 Other 1 Approval 22-Jan-2018 A Approved KHEP-OT-0156-00 Closed

1356DF-T-TJ-100
1356DF-T-TJ-101
1356DF-T-TJ-103
1356DF-T-TJ-104
1356DF-T-TJ-105
1356DF-T-TJ-106
0157 KHEP-OT-0157-00 Telecom Network Plan 14-Jan-2018 Other 1 Approval 31-Jan-2018 A Approved
1356DF-T-TJ-107
Closed
1356DF-T-TJ-108
1356DF-T-TJ-109
1356DF-T-TJ-110
1356DF-T-TJ-111
1356DF-T-TJ-112
Company Pre Qualification The Pest Control & Fumigation
0158 KHEP-OT-0158-00
Co. Ltd
17-Jan-2018 Other 1 Approval 27-Jan-2018 A Approved KHEP-OT-0158-00 Closed
0159 KHEP-OT-0159-00 Templates for submittal through Document Controller 18-Jan-2018 Other 1 Approval 29-Jan-2018 C Revise & Resubmit KHEP-OT-0159-00 Closed

0160 KHEP-OT-0160-00 Telecom Network Plan 1 to 20 20-Jan-2018 Other 1 Approval 31-Jan-2018 A Approved KHEP-OT-0160-00 Closed
Ter fiber optics distribution diagram 1/2 & 2/2 & Network
0161 KHEP-OT-0161-00
block diagram
24-Jan-2018 Other 1 Approval 21-Feb-2018 C Revise & Resubmit KHEP-OT-0161-00 Closed

Certificate of Achievement HDPE Butt welding machine (for


0162 KHEP-OT-0162-00 24-Jan-2018 Other 1 Approval KHEP-OT-0162-00 Open
portable system)

0163 KHEP-OT-0163-00 CV of Eng Ehab Fath Abbas Raslan as QA/QC Manager 29-Jan-2018 Other 1 Approval 6-Feb-2018 A Approved KHEP-OT-0163-00 Closed

1356DF-T-DT-406
1356DF-T-SL-501c
1356DF-T-SL-501d
0164 KHEP-OT-0164-00 Typical Duct Formation Details 30-Jan-2018 Other 1 Approval 21-Feb-2018 C Revise & Resubmit 1356DF-T-SL-503 Closed
1356DF-T-SL-504
1356DF-T-SL-505
1356DF-T-SL-506

0165 KHEP-OT-0165-00 QA/QC Organization Chart 4-Feb-2018 Other 1 Approval 11-Feb-2018 C Revise & Resubmit KHEP-OT-0165-00 Closed

0166 KHEP-OT-0166-00 Progress (Invoice No.10) for the Month of December 2017 7-Feb-2018 Other 1 Approval 11-Feb-2018 A Approved KHEP-OT-0166-00 Closed

0167 KHEP-OT-0167-00 CV of Quaid Jan as QC Low Current 7-Feb-2018 Other 1 Approval 21-Feb-2018 E Rejected KHEP-OT-0167-00 Closed
Cluster BC4 Ground floor First floor & Roof floor Drainage Approved w/
0168 KHEP-OT-0168-00
Layout
8-Feb-2018 Other 1 Approval 21-Feb-2018 B Comments
KHEP-OT-0168-00 Closed

Approved w/
0169 KHEP-OT-0169-00 CV of Naveed Khan as QC Civil 11-Feb-2018 Other 1 Approval 14-Feb-2018 B Comments
KHEP-OT-0169-00 Closed

Company Prequalification - RAMAH ALUM. &Metal Factory Approved w/


0170 KHEP-OT-0170-00
Co. Ltd.
13-Feb-2018 Architectural 1 Approval 24-Feb-2018 B Comments
KHEP-OT-0170-00 Closed

Approved w/
0171 KHEP-OT-0171-00 CV of Wassim Akram as QC Mechanical 14-Feb-2018 Other 1 Approval 14-Feb-2018 B Comments
KHEP-OT-0171-00 Closed

0172 KHEP-OT-0172-00 Reviced Procurement Schedule 14-Feb-2018 Other 1 Approval KHEP-OT-0172-00 Open

0173 KHEP-OT-0173-00 Company Prequalification - Ritver Paints & Coatings Co. 14-Feb-2018 Architectural 1 Approval 24-Feb-2018 E Rejected KHEP-OT-0173-00 Closed

0174 KHEP-OT-0174-00 Company Prequalification - Exa Alfanar 26-Feb-2018 Architectural 1 Approval KHEP-OT-0174-00 Open
0175 KHEP-OT-0175-00 Company Prequalification - ORCA 26-Feb-2018 Architectural 1 Approval KHEP-OT-0175-00 Open
0176 KHEP-OT-0176-00 RFI Log Summary " January 2018" 27-Feb-2018 Other 1 Approval KHEP-OT-0176-00 Open
0177 KHEP-OT-0177-00 RFI Log Summary " December 2017" 27-Feb-2018 Other 1 Approval KHEP-OT-0177-00 Open

Company Prequalification - Gulf Gardens Constructions.


0178 KHEP-OT-0178-00 27-Feb-2018 Other 1 Approval KHEP-OT-0178-00 Open
(Scope of works: Irrigation & softscaping)
SR NO CERTIFICATE NO. ACTIVITIES / DISCRIPTION SUBMITTAL DATE

ARCHITECTURAL
0001 KHEP-CT-AR-0001-00

CIVIL
0001 KHEP-CT-31-0001-00 Soil Sample Test Reports 17-Jan-2017

0002 KHEP-CT-CI-0002-00 Backfill Material Test Reports 2-Feb-2017


0003 KHEP-CT-CI-0003-00 Backfill Material Test Reports for Excavated Material 5-Feb-2017
0004 KHEP-CT-CI-0004-00 Plate load Test Reports 01 19-Feb-2017
0005 KHEP-CT-CI-0005-00 Plate load Test Reports 02 19-Feb-2017
0006 KHEP-CT-CI-0006-00 California Bearing Ratio Test Report (CBR) 19-Feb-2017
0007 KHEP-CT-CI-0007-00 Soil Sample Test Reports 4-Jan-2018

ELECTRICAL
0001 KHEP-CT-EL-0001-00

HVAC
0001 KHEP-CT-HVAC-0001-00

MECHANICAL
0001 KHEP-CT-ME-0001-00

LOW CURRENT (TELECOM)


0001 KHEP-CT-LC-0001-00

STRUCTURAL
0001 KHEP-CT-ST-0001-00
A Approved

B Approved w/ Comments

C Revise & Resubmit

E Rejected
SUBMITTED FOR RESPONDED AS
DISCIPLINE DATE RESPONDED INTERNEL REFERENCE NO
CODE STATUS CODE STATUS

Civil 1 Approval 26-Jan-2017 A Approved FSL Transmittal Job. 17-53-0154

Civil 1 Approval 6-Feb-2017 A Approved KHEP-CT-CI-0002-00


Civil 1 Approval 7-Feb-2017 A Approved KHEP-CT-CI-0003-00
Civil 1 Approval 21-Feb-2017 A Approved KHEP-CT-CI-0004-00
Civil 1 Approval 21-Feb-2017 A Approved KHEP-CT-CI-0005-00
Civil 1 Approval 21-Feb-2017 A Approved KHEP-CT-CI-0006-00
Civil 1 Approval KHEP-CT-CI-0007-00
REMARKS COMMENTS

Closed

Closed
Closed
Closed
Closed
Closed
Open
SR NO RISK ASSESSMENT NO. ACTIVITIES / INSPECTION ITEMS SUBMITTED DATE

001 KHEP-LE-0001 Security Requirements at Housing Expansion Project Site 25-Jan-2017


Value Engineering Proposal for Clusters Mechanical Works (VE-
002 KHEP-LE-0002 24-Jul-2017
MEP-01)
003 KHEP-LE-0003 Variation to Clusters Design – All Trades (VE-CLU-01) 24-Jul-2017
Objection to Non Conformance Report NCR-CI-0001 pertaining to
004 KHEP-LE-0004 24-Jul-2017
asphalting of Temporary parking areas
Request for approving companies to supplement Al Bawani
005 KHEP-LE-0005 27-Jul-2017
workforces in zone 2B,3B and 4B
006 KHEP-LE-0006 Controlled copy of the project specification 13-Aug-2017

007 KHEP-LE-0007 Material Submittals MA-26-0001 / MA-26-0002 / MS-EL-0001 13-Aug-2017

008 KHEP-LE-0008 Delegation of Authority 13-Aug-2017

009 KHEP-LE-0009 Appointment of Engr. Hassan Antar as Procurement manager 24-Oct-2017

010 KHEP-LE-0010 Temporary water connection 8-Nov-2017


011 KHEP-LE-0011 Power Supply to TER Room 14-Nov-2017
011 KHEP-LE-0012 Value Added Tax (VAT) 16-Nov-2017
A Approved

B Approved w/ Comments

C Revise & Resubmit

E Rejected
SUBMITTED FOR RESPONDED AS
DISCIPLINE DATE RESPONDED INTERNEL REFERENCE NO
CODE STATUS CODE STATUS
Others 4&5 Clarification & Handling KHEP-LE-0001

Others KHEP-LE-0002

Others KHEP-LE-0003

Others KHEP-LE-0004

Others RECALLED KHEP-LE-0005

Others KHEP-LE-0006

Others KHEP-LE-0007

Others KHEP-LE-0008

Others KHEP-LE-0009

Others KHEP-LE-0010
Others KHEP-LE-0011
Others KHEP-LE-0012
REMARKS COMMENTS

Open

Open

Open

Open

Open

Open

Open

Open

Open

Open
Open
Open
SR NO NCR NO (NCR) - Discription DECIPLINE

1 KHEP-NCR-CI-0001 Unapproved meterial Civil


2
KAUST RECEVING DATE AL-BAWANI RESPOND DATE KAUST RE-EVALUATE DATE

CIVIL
23-Jul-17 13-Aug-17 -
STATUS

Open
SR NO SITE INTRUCTION NO

1 KHEP-SI-CI-0001
2 KHEP-SI-CI-0002
3 KHEP-SI-CI-0003

1 KHEP-SI-ME-0001
2 KHEP-SI-ME-0002
3 KHEP-SI-ME-0003
4 KHEP-SI-ME-0004
5 KHEP-SI-ME-0005
6 KHEP-SI-ME-0006
7 KHEP-SI-ME-0007
8 KHEP-SI-ME-0008
9 KHEP-SI-ME-0009

1 KHEP-SI-AR-0001
(SITE INTRUCTION) - Discription

CIVIL
Improper Storing Of Meterials
Column Honeycomb
Additional Openings for Exhaust Fans

MECHANICAL
Improper Storing Of Meterials
Meterials used prior to Inspection
Backfilling prior to Inspection
Slab Casting Prior to Inspection's
Riser pipes Closed with Plaster and Tile without Inspection
Metal Duct & Fittings
HVAC Duct Open Ends
HVAC Duct Work (C2 A6 / C13, C14 & C15 B2)
Wall Closure Prior to Hydrotest (C15 B2, C1 A6)

ARCHITECTURAL
Faulty Block Works
DECIPLINE KAUST RECEVING DATE AL-BAWANI RESPOND DATE KAUST RE-EVALUATE DATE STATUS

Civil 31-Oct-17 12-Aug-17 - OPEN


Civil 14-Dec-17
Civil 17-Dec-17 OPEN

Mechanical 26-Jul-17 6-Aug-17 9-Aug-17 OPEN


Mechanical 5-Aug-17 12-Aug-17 - CLOSED
Mechanical 21-Aug-17 - - OPEN
Mechanical 28-Nov-17
Mechanical 28-Nov-17
Mechanical 22-Jan-18 Open
Mechanical 1-Feb-18 OPEN
Mechanical 13-Feb-18 Open
Mechanical 14-Feb-18 Open

Architectural 17-Dec-17 OPEN