ARCHITECTURAL
0001 KHEP-CT-AR-0001-00
CIVIL
0001 KHEP-ITP-31-001-00 Inspection and Testing Plan for Earthworks 22-Jan-2017
0001.1 KHEP-ITP-31-001-01 Inspection and Testing Plan for Earthworks 6-Feb-2017
0002 KHEP-ITP-31-002-00 Inspection and Testing Plan for Termite Control 26-Jan-2017
0003 KHEP-ITP-CI-003-00 Inspection and Test Plan Masonry Units & Bricks 1-Apr-2017
Inspection and Test Plan Concrete Masonry Units & Building
0003.1 KHEP-ITP-CI-003-01 26-Apr-2017
Bricks-Sec 04 2000
0004 KHEP-ITP-CI-004-00 ITP for Cast in Place Portland Cement Concrete 30-Jan-2017
0007 KHEP-ITP-CI-007-00 Inspection and Test Plan Joint Sealant-Sec.07 9200 12-Apr-2017
0008 KHEP-ITP-CI-008-00 Inspection and Test Plan Concrete Plant Management/Control 12-Apr-2017
Inspection and Test Plan Epoxy Grout & Cement Base Non-
0009 KHEP-ITP-CI-009-00 17-Apr-2017
Shrink Grout
Inspection and Test Plan Epoxy Grout & Cement Base Non-
009.1 KHEP-ITP-CI-009-01 26-Apr-2017
Shrink Grout
0010 KHEP-ITP-CI-010-00 Inspection & Plan Earth Work - for Under Ground Utilities 3-May-2017
0012 KHEP-ITP-CI-012-00 Inspection & Test Plan Architectural Painting - Internal External 21-Aug-2017
0014 KHEP-ITP-CI-0014-00 Inspection & Test Plan Tiling (Ceramic Wall and Floor Tiles) 18-Sep-2017
0021 KHEP-ITP-CI-0021-00 Inspection & Test Precast concrete Element (Section: 32 1122) 10-Oct-2017
0022 KHEP-ITP-CI-0022-00 Inspection & Test Plan Metal Works - For Buildings 17-Oct-2017
0023 KHEP-ITP-CI-0023-00 Inspection & Test Building Furnishings works 18-Oct-2017
ELECTRICAL
Inspection & Test Plan Above Grade Conduit. Fittings &
0001 KHEP-ITP-EL-0001-00 13-May-2017
Accessories Sec. 26 0534
Inspection & Test Plan Below Grade Conduit & Duct Bank Sec.
0002 KHEP-ITP-EL-0002-00 13-May-2017
26 0510, 0534 & 0553
Inspection & Test Plan Boxes (Junction, Terminal and Pull) Wire
0003 KHEP-ITP-EL-0003-00 31-May-2017
Troughs and Wire ways Division 26
0004 KHEP-ITP-EL-0004-00 Inspection & Test Plan Wiring Devices Division 26 2726 3-Jun-2017
Inspection & Test Plan Grounding & Bonding for Electrical
0005 KHEP-ITP-EL-0005-00 14-Aug-2017
System Sec. 26 00526, 27 0526
Inspection & Test Plan Grounding & Bonding for Electrical
0005.1 KHEP-ITP-EL-0005-01 11-Sep-2017
System Sec. 26 00526, 27 0526
Inspection & Test Plan Low Voltage Cable & Wire Sec. 26 00519,
0006 KHEP-ITP-EL-0006-00 30-Aug-2017
26 0553
Inspection & Test Plan Internal Lighting System (Section: 26
0007 KHEP-ITP-EL-0007-00 13-Sep-2017
5100)
Inspection & Test Plan Exterior Lighting System (Section: 26
0008 KHEP-ITP-EL-0008-00 3-Oct-2017
5610)
0009 KHEP-ITP-EL-0009-00 Inspection & Test Plan Panel Board (Section: 26 2416) 7-Oct-2017
0010 KHEP-ITP-EL-0010-00 Inspection & Test Plan Electric Meter (Section: 26 2714) 10-Oct-2017
HVAC
Inspection & Test Plan HVAC Metal Duct System Sec. 23 3300,
0001 KHEP-ITP-HVAC-0001-00 14-May-2017
0528 & 0713
Inspection & Test Plan HVAC - Exhaust Fan System Sec. 23
0002 KHEP-ITP-HVAC-0002-00 22-May-2017
3413
Inspection & Test Plan Testing Adjesting & Balancing HVAC
0003 KHEP-ITP-HVAC-0003-00 29-Jan-2018
System sec 23 0593
Inspection & Test Plan HVAC - Air Outlet & Inlet (Air handing
0004 KHEP-ITP-HVAC-0004-00 29-Jan-2018
unit AHU) sec 23 7412
0005 KHEP-ITP-HVAC-0005-00 Inspection & Test Plan - Air Cooled VRV Systems Sec 23 8129 19-Feb-2018
MECHANICAL
Inspection and Testing Plan for Gravity Sanitary Sewer and
0001 KHEP-ITP-33-0001-00 28-Jan-2017
Storm Water Drainage
0003 KHEP-ITP-ME-0003-00 Inspection and Testing Plan Hydro static Testing - All Application 4-Jun-2017
0004 KHEP-ITP-ME-0004-00 Inspection and Testing Plan Metallic Piping Installation 21-Aug-2017
0004.1 KHEP-ITP-ME-0004-01 Inspection & Test Plan Metallic Piping Installation & Testing 13-Sep-2017
0005 KHEP-ITP-ME-0005-00 Inspection & Test Plan Welding of On-Plot Piping 18-Sep-2017
0006 KHEP-ITP-ME-0006-00 Inspection & Test Plan Irrgation system & Piping 19-Sep-2017
0006.1 KHEP-ITP-ME-0006-01 Inspection & Test Plan Irrigation system & Piping 11-Oct-2017
0005 KHEP-ITP-LC-0005-00 Inspection & Test Plan IP CCTV System (Division 28 0513) 20-Dec-2017
PLUMBING
Inspection & Test Plan Bulding Drain & Drainage Piping Sec. 22
0001 KHEP-ITP-PL-0001-00 13-May-2017
1424 & 23 0528
Inspection & Test Plan Roof Drain & Drainage Piping Sec. 22
0002 KHEP-ITP-PL-0002-00 13-May-2017
1424 & 23 0528
0003 KHEP-ITP-PL-0003-00 Instection & Test Plan Plumbing Fixtures Sec.22 400 13-May-2017
Instection & Test Plan Electric Water Heater Sec. 22 3000 &
0004 KHEP-ITP-PL-0004-00 13-May-2017
22 0525
0005 KHEP-ITP-PL-0005-00 Inspection & Test Plan Building Sprinkler and Standpipe System 24-Sep-2017
STRUCTURAL
0001 KHEP-ITP-ST-0001-00
A Approved
B Approved w/ Comments
E Rejected
SUBMITTED FOR RESPONDED AS
DISCIPLINE DATE RESPONDED INTERNEL REFERENCE NO
CODE STATUS CODE STATUS
Architectural
Approved w/
Civil 1 Approval 31-Jan-2017 B Comments
KITP-Q-004
Approved w/
Electrical 1 Approval 30-Sep-2017 B Comments
BKITP-EL-005
Approved w/
Electrical 1 Approval 21-Sep-2017 B Comments
BKITP-E-006-00
Approved w/
Electrical 1 Approval 20-Sep-2017 B Comments
KITP-EL-007
Approved w/
Electrical 1 Approval 9-Oct-2017 B Comments
KITP-EL-008
Approved w/
Electrical 1 Approval 17-Oct-2017 B Comments
BKITP-EL-009
Approved w/
Electrical 1 Approval 17-Oct-2017 B Comments
BKITP-EL-010
Approved w/
Electrical 1 Approval 23-Dec-2017 B Comments
KITP-EL-011
Approved w/
Low Current 1 Approval 12-Jun-2017 B Comments
BKITP-LC-001-01
Approved w/
Low Current 1 Approval 23-Jan-2018 B Comments
BKITP-T-005-00
Approved w/
Low Current 1 Approval 27-Dec-2017 B Comments
BKITP-T-008-00
Approved w/
Plumbing 1 Approval 25-Oct-2017 B Comments
KITP-S-040-01
REMARKS COMMENTS
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Open
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
SR NO METHOD OF STATEMENT NO. ACTIVITIES / INSPECTION ITEMS
ARCHITECTURAL
0001 KHEP-MOS-AR-0001-00 Method of Statement for Portland Cement Plastering
0002 KHEP-MOS-AR-0002-00 Method of Statement for CMU - Block Work
0003 KHEP-MOS-AR-0003-00 Method of Statement for Water Proofing for Wet Areas
CIVIL
0000 KHEP-MS-01-0001-00 Method of Statement for Site Works
0009 KHEP-MOS-CI-0009-00 Method of Statement for Gravity Testing Of Storm Drainage Pipes
0009.1 KHEP-MOS-CI-0009-01 Method of Statement for Gravity Testing Of Storm Drainage Pipes
0010 KHEP-MOS-CI-0010-00 Method of Statement for Leak Test of Sanitary GRP Manholes
0010.1 KHEP-MOS-CI-0010-01 Method of Statement for Leak Test of Sanitary GRP Manholes
ELECTRICAL
0001 KHEP-MS-26-0001-00 Method of Statement for Electrical Power Works
HVAC
0001 KHEP-MOS-HVAC-0001-00 Method of Statement of VRF System
MECHANICAL
0001 KHEP-MS-33-0003-00 Method of Statement for Potable Water and Fire Fighting System
PLUMBING
Method of Statement for Drainage Pipe Installation Inside The
0001 KHEP-MOS-PL-0001-00
Toilet
STRUCTURAL
0001 KHEP-MOS-ST-0001-00 Method of Statement for Placing Concrete & Shoring
0006 KHEP-MOS-ST-0006-00 Method of Statement for Provide New Opening in Concrete Slab
0006.1 KHEP-MOS-ST-0006-01 Method of Statement for Provide New Opening in Concrete Slab
0006.2 KHEP-MOS-ST-0006-02 Method of Statement for Provide New Opening in Concrete Slab
B Approved w/ Comments
E Rejected
SUBMITTED FOR RESPONDED AS
SUBMITTED DATE DISCIPLINE DATE RESPONDED
CODE STATUS CODE STATUS
Approved
3-Oct-2017 Civil 1 Approval 9-Oct-2017 B w/
Comments
Revise &
20-Dec-2017 Civil 1 Approval 23-Dec-2017 C Resubmit
Revise &
8-Jan-2018 Civil 1 Approval 9-Jan-2018 C Resubmit
Approved
10-Jan-2018 Civil 1 Approval 11-Jan-2018 B w/
Comments
Approved
2-Feb-2017 Civil 1 Approval 9-Feb-2017 B w/
Comments
30-Mar-2017 Civil 1 Approval 5-Apr-2017 E Rejected
Revise &
24-Apr-2017 Civil 1 Approval 6-May-2017 C Resubmit
Approved
9-May-2017 Civil 1 Approval 30-May-2017 B w/
Comments
Approved
15-Jan-2018 Civil 1 Approval 16-Jan-2018 B w/
Comments
Approved
22-Jan-2017 Electrical 1 Approval 31-Jan-2017 B w/
Comments
Approved
24-Jan-2017 Electrical 1 Approval 31-Jan-2017 B w/
Comments
Revise &
30-Apr-2017 Electrical 1 Approval 17-May-2017 C Resubmit
20-May-2017 Electrical 1 Approval 22-May-2017 A Approved
Revise &
8-May-2017 Electrical 1 Approval 22-May-2017 C Resubmit
24-May-2017 Electrical 1 Approval 25-May-2017 A Approved
Revise &
8-Feb-2018 HVAC 1 Approval 20-Feb-2018 C Resubmit
Revise &
22-Jan-2017 Mechanical 1 Approval 31-Jan-2017 C Resubmit
Approved
7-Oct-2017 Mechanical 1 Approval 11-Oct-2017 B w/
Comments
Approved
7-Oct-2017 Mechanical 1 Approval 26-Oct-2017 B w/
Comments
Approved
23-Jan-2018 Mechanical 1 Approval 1-Feb-2018 B w/
Comments
Approved
22-Jan-2017 Telecom 1 Approval 31-Jan-2017 B w/
Comments
Approved
22-Jul-2017 Telecom 1 Approval 27-Sep-2017 B w/
Comments
Revise &
22-May-2017 Plumbing 1 Approval 1-Jun-2017 C Resubmit
Revise &
22-Oct-2017 Plumbing 1 Approval 25-Oct-2017 C Resubmit
Approved
11-Feb-2018 Plumbing 1 Approval 13-Feb-2018 B w/
Comments
Revise &
30-Mar-2017 Structural 1 Approval 4-Apr-2017 C Resubmit
Approved
24-Apr-2017 Structural 1 Approval 6-May-2017 B w/
Comments
3-May-2017 Structural 1 Approval 17-May-2017 A Approved
Approved
22-May-2017 Structural 1 Approval 3-Jun-2017 B w/
Comments
Revise &
13-Jul-2017 Structural 1 Approval 20-Jul-2017 C Resubmit
Revise &
27-Jul-2017 Structural 1 Approval 31-Jul-2017 C Resubmit
9-Aug-2017 Structural 1 Approval 12-Aug-2017 A Approved
26-Dec-2017 Structural 1 Approval 28-Dec-2017 A Approved
Revise &
26-Dec-2017 Structural 1 Approval 28-Dec-2017 C Resubmit
Revise &
1-Jan-2018 Structural 1 Approval 4-Jan-2018 C Resubmit
Approved w/ Comments
Revise & Resubmit
Rejected
KHEP-MOS-AR-0001-00 Closed
KHEP-MOS-AR-0002-00 Closed
KHEP-MOS-AR-0003-00 Closed
KHEP-MS-RD-0001 Closed
KHEP-MS-RD-1001-R00 Closed
KHEP-MS-LH-0001 Closed
KHEP-MS-SD-001-R00 Closed
KHEP-MS-33-0001-00 Closed
KHEP-MS-SS-001-R00 Closed
KHEP-MS-33-0002-00 Closed
KHEP-MS-33-0002-00 Closed
KHEP-MOS-CI-0003-00 Closed
KHEP-MS-IR-001 Closed
KHEP-MOS-CI-0005-00 Closed
KHEP-MOS-CI-0005-01 Closed
KHEP-MOS-CI-0005-02 Closed
KHEP-MOS-CI-0005-03 Closed
KHEP-MOS-CI-0006-00 Closed
KHEP-MOS-CI-0007-00 Closed
KHEP-MOS-CI-0008-00 Closed
KHEP-MOS-CI-0009-00 Closed
KHEP-MOS-CI-0009-01 Closed
KHEP-MOS-CI-0010-00 Closed
KHEP-MOS-CI-0010-01 Closed
KHEP-MS-MB-0001 Closed
KHEP-MS-TE-0012 Closed
KHEP-MOS-CI-0013-00 Closed
KHEP-MOS-CI-0013-01 Closed
KHEP-MOS-CI-0014-00 Closed
KHEP-MS-LMV-001 Closed
KHEP-MS-LW-0001 Closed
KHEP-MOS-EL-0003-00 Closed
KHEP-MOS-EL-0003-01 Closed
KHEP-MOS-EL-0004-00 Closed
KHEP-MOS-EL-0004-01 Closed
KHEP-MOS-HVAC-0001-00 Closed
KHEP-MS-PF-001 Closed
KHEP-MOS-ME-0001-01
Note KHEP-MS-33-0003-00 as Closed
Rev 0
KHEP-MOS-ME-0002-00 Closed
KHEP-MOS-ME-0003-00 Closed
KHEP-MS-CN-001 Closed
KHEP-MOS-LC-0002-00 Closed
KHEP-MOS-PL-0001-00 Closed
KHEP-MOS-PL-0002-00 Closed
KHEP-MOS-PL-0002-01 Closed
KHEP-MOS-ST-0001-00 Closed
KHEP-MOS-ST-0001-01 Closed
KHEP-MOS-ST-0002-00 Closed
KHEP-MOS-ST-0003-00 Closed
KHEP-MOS-ST-0004-00 Closed
KHEP-MOS-ST-0004-01 Closed
KHEP-MOS-ST-0004-02 Closed
KHEP-MOS-ST-0005-00 Closed
KHEP-MOS-ST-0006-00 Closed
KHEP-MOS-ST-0006-01 Closed
KHEP-MOS-ST-0006-02 Closed
KHEP-MOS-ST-0007-00 Closed
SR NO MATERIAL SUBMISSION NO. ACTIVITIES / INSPECTION ITEMS MANUFACTURER
3.Bituminous Damp-Proofing
1. Hollow concrete Block 100mm x 200mm x
400mm
Saudi Ready Mix
0002 KHEP-MS-AR-0002-00
2. Hollow concrete Block 150mm x 200mm x Concrete Co. Ltd.
400mm
ALAMDAR
0004 KHEP-MS-AR-0004-00 Thermal Insulation Board; Polyurethane
VAPOTHERM CO. LTD
Masonry Units
1. Kitchen Cabinet
Al Bawani Casework
0008 KHEP-MS-AR-0008-00 2. Vanity Cabinet
factory Riyadh, KSA
3. Built-In Cabinet
4- Pantry Cabinet
Residential Casework
1. Kitchen Cabinet
Al Bawani Casework
0008.1 KHEP-MS-AR-0008-01 2. Vanity Cabinet
factory Riyadh, KSA
3. Built-In Cabinet
4- Pantry Cabinet
Residential Casework
1. Kitchen Cabinet
Al Bawani Casework
0008.2 KHEP-MS-AR-0008-02 2. Vanity Cabinet
factory Riyadh, KSA
3. Built-In Cabinet
4- Pantry Cabinet
Metal Lath
Isam Kabbani &
0009 KHEP-MS-AR-0009-00
Partners Jeddah, KSA
1. Plastering Accessories
Profils Systemes
0011 KHEP-MS-AR-0011-00 Aluminum Window
(Toundra)
Aluminum Window
PPG Industries Inc.
0012 KHEP-MS-AR-0012-00 1. Glaze fo Aluminum Windows Dow Corning
(Sealant)
2. Sealant
Metal Fabrication
RAMZ CO. FOR
METAL IND. Riyadh,
1.G.I. Steel Ladder Cage
0013 KHEP-MS-AR-0013-00 KSA
Al Jazeera Paints -
2.Paint-Primer and Top Coat
(Primer & Top Coat)
Metal Fabrication
RAMZ CO. FOR
METAL IND. Riyadh,
1.Galvanized Steel ladder Safety Cage
0013.1 KHEP-MS-AR-0013-01 KSA
Al Jazeera Paints -
2.Paint-Primer and Top Coat (Epoxy)
(Primer & Top Coat)
Aluminum Window
Guardian Sunguard
1. Glaze fo Aluminum Windows
0014 KHEP-MS-AR-0014-00 Dow Corning
(Sealant)
2. Sealant
ALUMINUM WINDOWS
1. GLAZE FOR ALUMINUM WINDOW
SAMPLES:
1. 6mm LIGHT GREY GLASS + 6mm CLIMA
GUARD
0014.1 KHEP-MS-AR-0014-01 NEUTRAL 70 LOW E GLASS + SPACER 12mm Guardian Sunguard
2. 6mm BRONZE GLASS + 6mm CLIMA GUARD
NEUTRAL 70 LOW E GLASS + SPACER 12mm
Railings:
RAMZ CO. FOR
1. Galvanized Steel Staircase Railing
METAL IND. Riyadh,
2. Galvanized
0015 KHEP-MS-AR-0015-00 KSA
Steel Hand Railing
Al Jazeera Paints -
3. Galvanized Steel Balcony Guard Railing
(Primer & Top Coat)
4. Paints - Primer & Top Coat
Railings:
RAMZ CO. FOR
1. Galvanized Steel Staircase Railing
METAL IND. Riyadh,
2. Galvanized
0015.1 KHEP-MS-AR-0015-01 KSA
Steel Hand Railing
Al Jazeera Paints -
3. Galvanized Steel Balcony Guard Railing
(Primer & Top Coat)
4. Paints - Primer & Top Coat
GYPSUM BOARD
1. GYPSUM BOARD 12.5mm MOISTURE
RESISTANT
2. GYPSUM BOARD 16mm MOISTURE RESISTANT
Mada Gypsum Yanbu,
0016 KHEP-MS-AR-0016-00 3. GYPSUM BOARD 12.5mm 2HRS FIRE
KSA
RESISTANT
4. GYPSUM BOARD 16mm 2HRS FIRE RESISTANT
5. GYPSUM BOARD 12.5mm 2HRS FIRE
RESISTANT
Masonry Units
Waterproofing System
1. Waterproofing Membrane -
Insuwrap PVC 2000 WMR
2.
Thermal Insulation
3. Geotextile
0021 KHEP-MS-AR-0021-00 See Attached Sheet
4.
Polyethylene Sheet
5. Aluminium Flashing
6.Polyurethane
Sealant
(With Samples)
Roof Waterproofing System
1. GS
Primer - D41
2. Waterproofing Membrane - GS
0021.1 KHEP-MS-AR-0021-01 Gulf Seal
Plasto 4G
3.Waterproofing Membrane - GS Plasto 4F
(With Samples)
1. CC Technique-Arcel
SP20
2.DWI-
Derma Primer
3.DWI-Derma 4170-
4170SL
Roof Waterproofing System:
0022 KHEP-MS-AR-0022-00 4.ATCO-
(With Samples)
Separation
Sheet(Polyethylene)
5.SAPTEX-Extruded
polystyrene Insulation
Boards
6.Bonar Natpet
1. CC Technique-Arcel
SP20
2.AWAZEL- Py
Membranes
PY40200E-
PY40200EM
Roof Waterproofing System:
0023 KHEP-MS-AR-0023-00
(With Samples) 3.ATCO-
Separation
Sheet(Polyethylene)
4.SAPTEX-Extruded
polystyrene Insulation
Boards
5.ALYAF
GYPSUM BOARD
1. GYPSUM BOARD 12.5mm MOISTURE
RESISTANT UNITED MINING
0024 KHEP-MS-AR-0024-00 2. GYPSUM BOARD 16mm MOISTURE RESISTANT INDUSTRIES
3. GYPSUM BOARD 12.5mm 1HR FIRE RESISTANT JEDDAH, KSA
4. GYPSUM BOARD 15mm 1HR FIRE RESISTANT
5. JOINT TAPE & JOINT COMPOUND
PAINTINGS
1. INTERIOR PAINT SYSTEM AL JAZEERA PAINTS
0026 KHEP-MS-AR-0026-00
2. POLYURETHANE PAINT SYSTEM FOR WOOD JEDDAH,KSA
3. EPOXY FLOORING PAINT SYSTEM
Ikk Group of
0030 KHEP-MS-AR-0030-00 Wall & Celing Metal Framing Companies
Jeddah,Saudi Arabia
Ceiling framing:
Binex Jeddah, Saudi
0031 KHEP-MS-AR-0031-00 1. Suspended ceiling
Arabia
accessories
GYPSUM BOARD ASSEMBLIES:
1. SUSPENDED CEILING ACCESSORIES SAUDI ALLIED METAL
2. DRY WALL FRAMING ACCESSORIES INDUSTRIES – Metal
3. GYPSUM BOARD – REGULAR Framing System
0032 KHEP-MS-AR-0032-00
4. GYPSUM BOARD – MOISTURE RESISTANT MADA GYPSUM –
5. GYPSUM BOARD – FIRE RESISTANT Gypsum Board
6. PLASTERBOARD ACCESSORIES
(with Samples)
Exterior Paintings
Jotun Jeddah, Saudi
0033.1 KHEP-MS-AR-0033-01 1. Acrylic Emulsion paint system
Arabia
(Samples for Texture paint finish)
Internal Paint System:
1. Acrylic Emulsion paint system: Eggshell (Silk Jotun Jeddah, Saudi
0034 KHEP-MS-AR-0034-00
finish) Arabia
walls & ceiling
External Paint System AL JAZEERA
0035 KHEP-MS-AR-0035-00
1. Exterior emulsion paint system for walls JEDDAH,Saudi Arabia
Tiling:
Saveto construction
0036 KHEP-MS-AR-0036-00 1. Tile adhesive-ceramic tile fix
materials
(weather resistant cementitious adhesive)
Tiling:
Saveto construction
0037 KHEP-MS-AR-0037-00 1. Tile grouting-vetonit tile grout
materials
(weather resistant tile grout)
Tiling
0039 KHEP-MS-AR-0039-00 BASF
1- Tile grout-master tile 30
Tiling
0040 KHEP-MS-AR-0040-00 1- Tile Adhesive-Master tile 30 BASF
2- Tile Adhesive-Master tile 4
Door Hardwares 1.
Hinges
2. Mortise Lock cases
3. Cylinders
0041 KHEP-MS-AR-0041-00 4. Lever Handles Simplex Hardware
4. Escutcheon
5.Door Closer
6. Weather-
stripping/Threshold/Casketing/Astragals/ Sweeps
Tiling
1- Tile Adhesive - Laticrete 254 Platinum
2- Tile grout -Laticrete 1500 sanded grout
0042 KHEP-MS-AR-0042-00 Laticret
3- Tile grout - Laticrete1600 Unhanded grout
4- Tile grout -Laticrete 1776 grunt Admix
(Enhancer)
Tiling
1- Tile Adhesive - Laticrete 254 Platinum
2- Tile grout -Laticrete 1500 sanded grout
0042.1 KHEP-MS-AR-0042-01 3- Tile grout - Laticret
Laticrete1600 Unhanded grout
4- Tile grout -Laticrete
1776 grunt Admix (Enhancer)
Painting
0043 KHEP-MS-AR-0043-00 HEMPEL
1-Exterior anint Finish
Painting
0044 KHEP-MS-AR-0044-00 HEMPEL
1- Interior Paint Finish
SANITARY ACCESSORIES
1. PAPER HOLDER # AI0080CS
2. SOAP DISH CORNER # AC0964C
3. SHOWER RAIL SET 4 SPRAY # 28436001
0050 KHEP-MS-AR-0050-00 SEE ATTACHED
4. SINGLE LEVER BATH MIXER ½” # 33300 001
5. SHOWER PARTITION GLASS
6. BATHTUB WITH DRAIN #62661 / 68005
Exterior Finishes 1-
0056 KHEP-MS-AR-0056-00 TOB China
Terracotta
Tiling
1- Ceramic Tiles 500x500x9mm G-5000-BE 2-
Ceramic Tiles 500x500x9mm G-5006-BE 3- Forsan Ceramics
0057 KHEP-MS-AR-0057-00
Ceramic Tiles 500x500x9mm G-5035-IV 4- Riyadh,KSA
Ceramic Tiles 500x500x9mm G-3034-IV 5-
Ceramic Tiles 500x500x9mm G-Durina-IV
Tiling
Forsan Ceramics
0057.1 KHEP-MS-AR-0057-01 1- Ceramic Tiles 600x600x10mm Light Beige
Riyadh,KSA
2- Ceramic Tiles 600x600x10mm Beige
Wet Area Waterproofing
Absar Co. Ltd
0058 KHEP-MS-AR-0058-00 1- Durashield - Wet Area
Jeddah,KSA
Waterproofing System
Wet Area Waterproofing
0058.1 KHEP-MS-AR-0058-01 1- Durashield - Wet Area Delmon
Waterproofing System
Wet Area Waterproofing
0058.2 KHEP-MS-AR-0058-02 1- Durashield - Wet Area Delmon
Waterproofing System
Counter tops
Hanwha L&C
0059 KHEP-MS-AR-0059-00 1- Corian Counter top - Hanex
Corporation Co.Ltd.
2- Corian Counter top - Hanwha
SANITARY ACCESSORIES
1. CONCEALED CISTERM WC + BUTTON PANEL
2. HAND BIDET - SPC013
3. SPRAY W/ BASE & 1.2m HOSE – SPC010
4. 1.5m SINGLE HOSE – 4501
5. TUMBLER HOLDER – 93905
6. TISSUE HOLDER – 93903
EMPOLO SANITARY
0060 KHEP-MS-AR-0060-00 7. TOWEL RING – 93902
WARE
8. ROBE HOOK DOUBLE – 93904B
9. SHOWER SET – 8100 + 08 4700
10. CORNER SOAP HOLDER - 603-1
11. TOWEL BAR – 94001
12. SHOWER SET, 8”inch – BR-8 + SA003
13. MIXER SINGLE LEVER – 23 1101
SANITARY ACCESSORIES
1. CONCEALED CISTERM WC + BUTTON PANEL
2. HAND BIDET - SPC013
3. SPRAY W/ BASE & 1.2m HOSE – SPC010
4. 1.5m SINGLE HOSE – 4501
5. TUMBLER HOLDER – 93905
6. TISSUE HOLDER – 93903
EMPOLO SANITARY
0060.1 KHEP-MS-AR-0060-01 7. TOWEL RING – 93902
WARE
8. ROBE HOOK DOUBLE – 93904B
9. SHOWER SET – 8100 + 08 4700
10. CORNER SOAP HOLDER - 603-1
11. TOWEL BAR – 94001
12. SHOWER SET, 8”inch – BR-8 + SA003
13. MIXER SINGLE LEVER – 23 1101
Kitchen Hood 1-
0061 KHEP-MS-AR-0061-00 Ariston
SL 19.1p ix - F030098
Plumbing Accessories 1.
0065 KHEP-MS-AR-0065-00 Ablution Faucet - Stamina Spry (W0004) 2. Lima
Floor Drain - sf0017
Residential Appliances 1.
0066 KHEP-MS-AR-0066-00 Super Chef
Kitchen Hood - SC 90 Krese
CCCI Consultant
Hollow Metal Doors 1-
Creative for
0069 KHEP-MS-AR-0069-00 Single Leaf Mettal Door
Construction Industry
2- Double Leaf Mettal Door
Riyadh, KSA
Railings 1-
Staircase Aluminum Railings Regal Aluminum
0070 KHEP-MS-AR-0070-00
2- Balcony Aluminum Railings Kupeste Ltd. STI
( With Samples)
Wooden Door 1-
Integrated Wood
Wooden Door
0071 KHEP-MS-AR-0071-00 Industries Riyadh,
2- Fire Rated Door
KSA
( With Samples)
Portland cement for Plastering Mix for CMU Block
0072 KHEP-MS-AR-0072-00 Alazzaz Co.Ltd
Work & Concrete Surfaces
Counter tops 1-
Corian - Kitchen counter top
0073 KHEP-MS-AR-0073-00 2- Corian - Buffet Staron
counter top
( With Samples)
Counter tops 1-
Corian - Kitchen counter top
0073.1 KHEP-MS-AR-0073-01 2- Corian - Buffet Staron
counter top
JOINT SEALANT 1-
0074 KHEP-MS-AR-0074-00 DCP Saudi
Flex seal - PU425 for general joints
FIRE STOPPING 1-
0075 KHEP-MS-AR-0075-00 Fire stop sealant - Flamex one (Flexible in- FOSROC
tumescent sealant)
RECIDENTIAL APPLIANCE 1-
0076 KHEP-MS-AR-0076-00 GLEM - Polend
Kitchen hood - GHC93/63IX
Metal Fabrication
Tameem M.Bin Ashry
0078 KHEP-MS-AR-0078-00 1- Glav. Steel Ladder Safty cage 2- Paint
EST. Riyadh KSA.
- Primer & Top Coat
Tile Adhesive 1-
0080 KHEP-MS-AR-0080-00 Laticrete
Lacticrete 305 - for Ceramic Tile
Tile Adhesive 1-
0081 KHEP-MS-AR-0081-00 Lacticrete 325 Premium - for Ceramic, Porcelain Laticrete
Tile & Stone
Tile Adhesive 1-
0082 KHEP-MS-AR-0082-00 Lacticrete 335 Premium - for Ceramic, Porcelain, Laticrete
Glass Mosaic Tile & Stone
NON - Structural Metal Framing
0083 KHEP-MS-AR-0083-00 1- Metal stud & Runner for Gypsum Bawani Duct Factory
Board walls
Railings 1-
Staircase Aluminum Railings
Engineering Domain
0084 KHEP-MS-AR-0084-00 2- Balcony Aluminum
Riyadh, KSA
Railings
( With Samples)
Railings 1-
Staircase Aluminum Railings
2- Balcony Aluminum
Engineering Domain
0084.1 KHEP-MS-AR-0084-01 Railings
Riyadh, KSA
( With Samples)
Option-1 Aluminum Railings Option-2
Galvanized Steel
Mosaic 1-
0086 KHEP-MS-AR-0086-00 Longju
Ceramic Mosaic
Plumbing Fixtures
0087 KHEP-MS-AR-0087-00 Awal Bath Systems
1- Bathtub - Massah Bathtub
Plumbing Fixtures
0088 KHEP-MS-AR-0088-00 Penta
1- Concealed Flush Tank
ALUMINUM HARDWARES
1. WINDOW HANDLE – ART 0800
2. SIDE HANDLE – ART 648
3. DOOR HANDLE – ART 640
4. HINGE – ART 299
0093 KHEP-MS-AR-0093-00 LAVAAL
5. PUSH BOLT & ROD END – ART 478
6. BOTTOM HUNG WINDOW ARM – ART 410
7. DOOR HINGE – ART 670
(WITH SAMPLES)
WOODEN DOOR SAMPLE CONSIST OF:
A. CROSS SECTION SHOWING DETAILS
(PARTICLE BRD + HPL LAYER)
B. FINAL FINISHING/COLOR AS PER
INSTALLED AT MOCK-UP B2 (WELD
CHERRY - 2545 SF PG)
1. WOODEN DOORS FIRE RATED
FRAME: SOLID WOOD MERANTI, STAINED
FINISH
DOOR LEAF : PARTICLE BOARD, THERMAL
INSULATION & MDF WITH
HPL LAMINATED FINISH – WELD CHERRY
2. WOODEN DOORS WITH ACOUSTIC BAWANI CASEWORK
0094 KHEP-MS-AR-0094-00
FRAME: SOLID WOOD MERANTI, STAINED FACTORY
FINISH
DOOR LEAF : PARTICLE BOARD, ACOUSTIC &
MDF WITH HPL LAMINATED
FINISH – WELD CHERRY
3. WOODEN DOORS
FRAME: SOLID WOOD MERANTI, STAINED
FINISH
DOOR LEAF : PARTICLE BOARD WITH HPL
LAMINATED
FINISH – WELD CHERRY (SECTIONAL
SAMPLE - FOR VISUAL DETAIL ONLY)
ALUMINUM LOUVERS
1, ALUM. LOUVERS – 23481, 150 x 25 x 2mm
2. PAINT – POWDER COATED PE-F 1308, RAL
0095 KHEP-MS-AR-0095-00 9006 Smooth ALUPCO
TILING
1. CERAMIC TILE 400x400X9mm (dry area
flooring)
2. CERAMIC TILE 200x200X8mm (wet area
flooring)
3. CERAMIC TILE 200x400x9mm (wet area walls)
4. CERAMIC TILE 100x400x8mm (wet area
border)
0096 KHEP-MS-AR-0096-00 SAUDI CERAMIC
5. OUTSIDE ANGLE BEAD 20cm (wet area angle
bead)
6. CERAMIC MOSAIC TYPE 200x200x8mm
6. SKIRTING 100x400x8mm
SAMPLES PROVIDED FOR COLOR SELECTION
PURPOSES ONLY
THE SIZES AS PER LISTED ABOVE
UNIT MASONRY
1. CMU 200x200x400mm
2. CMU 150x200x400mm AL BASSAMI GROUP
0097 KHEP-MS-AR-0097-00
3. CMU 100x200x400mm CO.
4. CMU 200x200x400mm (FIRE RATED)
METAL FABRICATION
1. Galvanized Steel Gate - 900 x 1600 mm (with
Ramz co. for Metal
0100 KHEP-MS-AR-0100-00 Sample - Final Fabrication to be As per Approved
Ind.
Attached Drawing)
Residential Casework
1. Master Bedroom Wardrobe
2. Badroom -1 Wardrove
3. Bedroom -2 Wardrove Bawani CaSEWORK
0102 KHEP-MS-AR-0102-00
4. Flex room Wardrove FACTORY Riyadh, KSA
Resinous Flooring
1. Jotafloor Topcoat
Jotun Paints Jeddah,
0103 KHEP-MS-AR-0103-00 2. Jotafloor Sealer
KSA
(With Sample Board - 3 Option Colour)
Painting works
1. Interior Paints Arbian Building
0105 KHEP-MS-AR-0105-00 2. Exterior Paints Chemical Factory
Jeddah KSA
Plumbing Fixtures 1.
Kitchen sink - double bowl S6-L0-15 (Cluster)
Jawadah Industrial
0106 KHEP-MS-AR-0106-00 2. Kitchen sink
Co. Ltd
- Single bowl S6-L0-20 (Ancillary Building)
Balcony Waterproofing
0110 KHEP-MS-AR-0110-00 Delmon
1.Durashield-Balcony Waterproofing System
Balcony Waterproofing
1. Bituplus P 4200 - 4mm THK App Moditied
0110.1 KHEP-MS-AR-0110-01 Bituminos Elastomeric Membrane Polybit, Mattex
2. Polyprime SB
3. Geotextile 180g/m2
Portland cement for Plastering
Saveto Construction
0111 KHEP-MS-AR-0111-00 1. Vetonit Finish Wreg
Materials
2. Vetonit Finish WR
TERRACOTTA CLAY TILE RAINSCREEN ASSEMBLY
1. TERRACOTTA (ARCHITON) Asiklar Bldg. Product
0112 KHEP-MS-AR-0112-00
Architon
Thermal Insulation
0115 KHEP-MS-AR-0115-00 Blue Guard
1- Polystyrene Board for Cavity External wall
United Mining
Cement Board
0117 KHEP-MS-AR-0117-00 Industries
1. Cement Board - Unicem
Jeddah
Thermal Insulation
0118 KHEP-MS-AR-0118-00 Blue Guard
1. Polystyrene Board for Cavity External Wall
Tiling Wunsch Plaster
0119 KHEP-MS-AR-0119-00
1. Tile Adhesive WP-552 Factory
Portland Cement Plastering
Wunsch Plaster
0120 KHEP-MS-AR-0120-00 1. Cement render plaster WP-200
Factory
2. Bonding Coat WP-110
Countertops
Dupont corian
0121 KHEP-MS-AR-0121-00 1. Corian - Dupont (1454 Pebbel Stream)
interiors
Sanitary Accessories
01. Soap Dish - A9123AA (IDEAL)
02. Toilet Tissue Holder - A9127AA (IDEAL)
03. Towel Ring - A9130AA (IDEAL)
Al Ghamdi Co.
0122 KHEP-MS-AR-0122-00 04. Robe Hook Double - A9116AA (IDEAL)
IDEAL
05. Towel Rail - A9118AA (IDEAL)
06. Tumbler Holder - A9121AA (IDEAL)
07. Trigger Spray - B0595AA (IDEAL)
CIVIL
1 - Neprolast
2 - Sappco
0001 KHEP-MA-33-0001-00 uPVC Pipe & Fittings
3 - Al-
Tamam
WAMCO ( Wadi
Reinforcement Accessories PVC Spacers &
0003 KHEP-MS-CI-0003-00 Maramer Trading
Chamfers
Group)
Reinforcement Accessories Manufacturers ISSAM
0003.1 KHEP-MS-CI-0003-01 Issam Kabani
KABANI Vendors: GURBETCILER
National Factory for
0003.2 KHEP-MS-CI-0003-02 Reinforcement Accessories Plastic Industry (NFP)
Co. Ltd.
1. Future Pipe,
0005.1 KHEP-MS-CI-0005-01 UPVC Pipe & Fittings (Sewer Line(Infra) ) ALMUNIF PIPE MMP
Future Pipe
0011 KHEP-MS-CI-0011-00 GRP manholes for sewer network system
Industries
Saudi Valve
0016 KHEP-MS-CI-0016-00 Flanged Gate Valve with Spindle and hand wheel
Manufacturing ( AVK)
Ferrotech
0025 KHEP-MS-CI-0025-00 Ladder for Storm Network System
International Fze.
GRP Manholes with ladder for Sewer Network
0026 KHEP-MS-CI-0026-00 Al Munif
System
GRP Manholes with ladder for Sewer & Inspection
0026.1 KHEP-MS-CI-0026-01 Al Munif
Chamber Network System
Water Stops for cast in situ of manholes for storm Isam Kabani Ikk -
0027 KHEP-MS-CI-0027-00
network Unitech
Water Stops for cast in situ of manholes for storm Isam Kabani Ikk -
0027.1 KHEP-MS-CI-0027-01
network Unitech
Fire Hydrant with Valve and Accessories for Fire Saudi Valve
0031 KHEP-MS-CI-0031-00
Fighting Network System Manufacturing ( AVK)
Fire Hydrant with Valve and Accessories for Fire Saudi Valve
0031.1 KHEP-MS-CI-0031-01
Fighting Network System Manufacturing ( AVK)
0036 KHEP-MS-CI-0036-00 Master seal Np 472 - Sealant Joint for Civil Work Basf
0037 KHEP-MS-CI-0037-00 Master seal Np 477 - Sealant Joint for Civil Work Basf
Saudi Valve
0050 KHEP-MS-CI-0050-00 Flanged Gate Valve
Manufacturing ( SVM)
Saudi Valve
0050.1 KHEP-MS-CI-0050-01 Flanged Gate Valve
Manufacturing ( SVM)
Saudi Valve
0050.2 KHEP-MS-CI-0050-02 Flanged Gate Valve, SurfaceBox, Spindle & T-Key
Manufacturing ( SVM)
GRE / RTR Pipes & Fittings for tie inn on potable & Future pipe industries
0052 KHEP-MS-CI-0052-00
Fire fighting network system (FPI)
GRE / RTR Pipes & Fittings for tie inn on potable & Future pipe industries
0052.1 KHEP-MS-CI-0052-01
Fire fighting network system (FPI)
0056 KHEP-MS-CI-0056-00 AWG14 & AWG12 for wiring irrigation system Al Fanar
ELECTRICAL
0000.3 KHEP-MS-EL-0001-03 LV Cables & Wires - PVC Sheathed for Outdoor Bahra Cable
New Products
0005 KHEP-MA-27-0002-00 HDPE Duct and Sub-Duct Industries Co.Ltd
(Neproplast)
Bahra Cables
0006 KHEP-MS-EL-0006-00 PVC Conduit, Fittings & Accessories
Company
1-Barton
2-
Saudi Steel Pipe
Rigid Steel Conduits, Fittings & Accessories
0007 KHEP-MS-EL-0007-00 Company
( Option 1, 2 & 3)
3- O-Z Gedney
(Fittings)
1-Barton
2-
Int'l Metal Hose Co.
Liquidtight Flexible Metal Conduit Fittings &
0009 KHEP-MS-EL-0009-00 3-
Accessories
Electri-flex Company
4-Neer / O-
Z Gedney (Fittings)
1-Wheatland
2-
Int'l Tube & C'duit Co.
0010 KHEP-MS-EL-0010-00 Electrical Metallic Tubing, Fittings & Accessories
3-
Neer / O-Z Gedney
(Fittings)
GE / Trilux / Bega /
0020.1 KHEP-MS-EL-0020-01 Lighting Fixtures
Jiso / Goccia
Lighting Fixtures -
GE / Trilux / Bega /
0020.2 KHEP-MS-EL-0020-02 Including Lux Calculation for Laundry Area, Powder
Jiso / Goccia
Room & EN-Suite (GF&FF) Option 1
GE / Trilux / Bega /
0020.3 KHEP-MS-EL-0020-03 Lighting Fixtures
Jiso / Goccia
GE / Trilux / Bega /
0020.4 KHEP-MS-EL-0020-04 Lighting Fixtures
Jiso / Goccia
MK Cable
PVC Conduit, Fittings & Accessories (Building
0023 KHEP-MS-EL-0023-00 Management
Wiring)
(Egatube)
Wiring Devices
0027 KHEP-MS-EL-0027-00 Option-1 MK-Honeywell
Wiring Devices
0027.1 KHEP-MS-EL-0027-01 Option-1 MK-Honeywell
Panel boards
0028 KHEP-MS-EL-0028-00 Schneider/ Mots
(Option 2)
0050 KHEP-MS-EL-0050-00 Low Voltage Single core wires - LS0H Bahra Cable
United Technology of
Electric Substation &
0055 KHEP-MS-EL-0055-00 Package Substation
Switchgears Co.
(USSG)
United Technology of
Electric Substation &
0055.1 KHEP-MS-EL-0055-01 Package Substation
Switchgears Co.
(USSG)
Al Zamil (SSP-OZG
0063 KHEP-MS-EL-0063-00 PVC Coated Conduit & Fittings
Wheatland)
New Products
0002 KHEP-MS-LC-0002-00 HDPE Duct 32mm Industries Co.Ltd
(Neproplast)
HDPE Duct 32mm & Fittings - New Products
0002.1 KHEP-MS-LC-0002-01 Transition Fitting 32mm - Industries Co.Ltd
Coupler 32mm (Including 25mm & 50mm) (Neproplast)
Edwards United
0005.1 KHEP-MS-LC-0005-01 Fire Alarm System Materials
Technologies
Alwasail Industrial
0006 KHEP-MS-LC-0006 HDPE Conduit & Accessories
Company
Alwasail Industrial
0008 KHEP-MS-LC-0008-00 HDPE Conduit 32mm & 25mm
Company
HVAC
Mueller Industries Inc.
0001 KHEP-MS-HVAC-0001-00 Refrigerant Pipework ASTM B280 (Copper)
USA
Al Bawani Duct
0003 KHEP-MS-HVAC-0003-00 Duct Work (Duct & Accessories)
Factory Riyadh KSA
Al Bawani Duct
0003.1 KHEP-MS-HVAC-0003-01 Duct Work (Duct & Accessories)
Factory Riyadh KSA
Al Bawani Duct
0004 KHEP-MS-HVAC-0004-00 Duct Work (Duct Work Only)
Factory Riyadh KSA
0005 KHEP-MS-HVAC-0005-00 Fresh Air Handling Unit (FAHU) Zamil Air Conditioners
0009 KHEP-MS-HVAC-0009-00 Air Terminal Devices (Grills & Diffuser) Gulf Grills Co
Greenheck Building
0011 KHEP-MS-HVAC-0011-00 Exhaust Fans
Value in Air
Greenheck Building
0011.1 KHEP-MS-HVAC-0011-01 Exhaust Fans
Value in Air
Gamma Line
0014 KHEP-MS-HVAC-0014-00 Air Terminal Devices (Grills & Diffusers)
International
Petra Engineering
0017 KHEP-MS-HVAC-0017-00 Fresh Air Package Unit
Industries co.
Exhaust Fans for Toilet & Laundry of All Clusters Carnes for Exhaust
0019.2 KHEP-MS-HVAC-0019-02
with Timer Switch (LEGRAND) fans
Mueller, Superlon,
0020 KHEP-MS-HVAC-0020-00 VRF System Accessories Neproplast, Easyfix,
Excel & Belden
MECHANICAL
Mariam Trading
0001 KHEP-MS-ME-0001-00 Pipe Support - Rubber Clamp
Company
Mariam Trading
0001.1 KHEP-MS-ME-0001-01 Pipe Support - Rubber Clamp
Company
1. Aljazera-Jasco
(Pipe) 2. Hitachi -
0002 KHEP-MS-ME-0002-00 ERW Pipe Galvanized SCH. 40 (GR.B)
(Fittings) 3.
Benken - (Fittings)
1. HITACHI
0004 KHEP-MS-ME-0004-00 Fire Protection pipe fittings
2. BENKEN
0011 KHEP-MS-ME-0011-00 Hanger & Support for Fire Protection Tembo Seven star
Reliable, Sheild,
0012 KHEP-MS-ME-0012-00 Sprinkler System Potter, System
Sensor, Calval
Sprinkler System (Addendum)
0012.1 KHEP-MS-ME-0012-01 Naffco
01. Reliable Sheild
PLUMBING
UPVC Pipe & Fittings (Drainage System) Class 4,
0001 KHEP-MS-PL-0001-00 ALMUNIF PIPE MMP
SCH. 40
0004 KHEP-MS-PL-0004-00 PPR Pipe & Fittings (Water System) 20 Bar ALMUNIF PIPE MMP
0005 KHEP-MS-PL-0005-00 UPVC Pipe Sleeve Class 4, SCH. 40 ALMUNIF PIPE MMP
Al-Jazera Factories
0005.1 KHEP-MS-PL-0005-01 Sleeve (Duct & Pipe) For steel Products Co.
Ltd ( JASCO )
Mariam Trading
0007 KHEP-MS-PL-0007-00 Pipe Support - Rubber Clamp
Company
Upvc & PPR - Hanger and Support, for Plumbing Mariam Trading
0007.1 KHEP-MS-PL-0007-01
System Company
0008 KHEP-MS-PL-0008-00 UPVC Sleeve Pipe Class 5, SCH. 80 AL MUNIF PIPE MMP
Tahweel Plumbing
0009 KHEP-MS-PL-0009-00 PPR Pipe (Water Supply)
System
0012 KHEP-MS-PL-0012-00 Hangers & Supports, Section 230528 Tembo Seven Star
0016 KHEP-MS-PL-0016-00 Floor Drain, Roof Drain, Trench and Clean Out Saudi Cast
0016.1 KHEP-MS-PL-0016-01 Floor Drain, Roof Drain, Trench and Clean Out Saudi Cast
0017.1 KHEP-MS-PL-0017-01 Water Supply : Gate Valves, Check Valve, Strainer Hattersley
Modern Time
0019.1 KHEP-MS-PL-0019-01 Electric Water Heater Technical System /
Rheem
0027 KHEP-MS-PL-0027-00 PPR Pipes & Fittings for Domestic Water System Cosmoplast
Diehl Metering /
0028 KHEP-MS-PL-0028-00 Smart Water Meter
Hydrus
STRUCTURAL
Bawan Metal
0001.1 KHEP-MS-ST-0001-01 Epoxy Coated Reinforcement Steel
Industries
0002 KHEP-MA-03-0002-00 Hessian Cloth/Burlap
Burlap Polyethylene Sheets: 1. Mohanjute
0002.1 KHEP-MS-ST-0002-01 1.Jute Hessian Cloth 2.Issam Kabbani
2.Polyethelene sheets (100 Micron) (IKK)
Al Fozan Building
0010 KHEP-MS-ST-0007-00 Tie Wire (Elector Galvanized)
Materials Co.
Fosam Company
0013 KHEP-MS-ST-0010-00 Form Release Agent
Limited
Fosam Company
0015.1 KHEP-MS-ST-0012-01 Isolation Joint Sealant
Limited (FOSROC)
0018 KHEP-MS-ST-0015-00 Concrete Repairs SIKA REP 100 SIKA Company Ltd.
0019 KHEP-MS-ST-0016-00 Concrete Repairs SIKA REP FINE SIKA Company Ltd.
Fosam Company
0020 KHEP-MS-ST-0017-00 Grout (Lokfix)
Limited (FOSROC)
Al Fozan Building
0024 KHEP-MS-ST-0021-00 Tie Wire (PVC or Electro Galvanized)
Materials Co.
Dermabit
0029 KHEP-MS-ST-0026-00 Bituminous Damp Proofing DermaDamp Waterproofing
Industries
Awazel-Arabian
0030 KHEP-MS-ST-0027-00 Bituminous Damp Proofing Awazel Damp Coat Waterproofing
Industries Co.
WAMCO (Wadi
0031 KHEP-MS-ST-0028-00 Isolation Joint Filler Board Maramer Trading
Group)
DCP (Don
0032 KHEP-MS-ST-0029-00 Curing Compound Construction
Products)
Al - Bassami Group
0035 KHEP-MS-ST-0032-00 Concrete Ready Mix
Co.
Al - Bassami Group
0035.1 KHEP-MS-ST-0032-01 Concrete Ready Mix
Co.
Fosam Company
0037 KHEP-MS-ST-0034-00 Bituminous paint: Nitoproof 10
Limited (FOSROC)
B Approved w/ Comments
E Rejected
SUBMITTED FOR RESPONDED AS
VENDOR DATE SUBMITTED DISCIPLINE DATE RESPONDED
CODE STATUS CODE STATUS
SAPPCO-TEXACO
Approved w/
Insuation Products 12-Mar-2017 Architectural 1 Approval 14-Mar-2017 B comments
Co. Ltd.
ALAMDAR
Approved w/
VAPOTHERM CO. 12-Mar-2017 Architectural 1 Approval 14-Mar-2017 B comments
LTD
Sulieman A. R. Approved w/
Namlah Factory
12-Mar-2017 Architectural 1 Approval 14-Mar-2017 B comments
Approved w/
GALCO Riyadh, KSA 9-Nov-2017 Architectural 1 Approval 19-Nov-2017 B comments
Mada Gypsum
Yanbu, KSA
23-Mar-2017 Architectural 1 Approval 4-Apr-2017 A Approved
Station for
Approved w/
Contracting Co. Ltd 11-Apr-2017 Architectural 1 Approval 13-Apr-2017 B comments
Jeddah,KSA
Station for
Approved w/
Contracting Co. Ltd 11-Apr-2017 Architectural 1 Approval 13-Apr-2017 B comments
Jeddah,KSA
UNITED MINING
Approved w/
INDUSTRIES 16-Apr-2017 Architectural 1 Approval 30-Apr-2017 B comments
JEDDAH, KSA
Station for
Contracting Co. Ltd 17-Apr-2017 Architectural 1 Approval 29-Apr-2017 E Rejected
Jeddah,KSA
Ikk Group of
Approved w/
Companies 22-Apr-2017 Architectural 1 Approval 2-May-2017 B comments
Jeddah,Saudi Arabia
ROOTS GROUP
Approved w/
Jeddah, Saudi Arabia 26-Apr-2017 Architectural 1 Approval 30-May-2017 B comments
TECHNI PROOF
Waterproofing &
Thermal Insulation
4-May-2017 Architectural 1 Approval 22-May-2017 E Rejected
Specialist
Revise &
BASF 7-May-2017 Architectural 1 Approval 20-May-2017 C Resubmit
Revise &
BASF 7-May-2017 Architectural 1 Approval 20-May-2017 C Resubmit
Revise &
Binex 9-May-2017 Architectural 1 Approval 20-May-2017 C Resubmit
Approved w/
Binex 6-Jul-2017 Architectural 1 Approval 12-Jul-2017 B comments
Revise &
HEMPEL 14-May-2017 Architectural 1 Approval 20-May-2017 C Resubmit
Revise &
HEMPEL 14-May-2017 Architectural 1 Approval 20-May-2017 C Resubmit
Approved w/
Binex Jeddah, KSA 23-May-2017 Architectural 1 Approval 5-Jun-2017 B comments
Approved w/
AL Safwa 5-Jun-2017 Architectural 1 Approval 11-Jun-2017 B comments
Sika Saudi Arabia
Co. Ltd.
5-Jun-2017 Architectural 1 Approval 11-Jun-2017 A Approved
GLOBAL ALUMINUM
SYSTEMS CO. LTD. Revise &
Riyadh, KSA
7-Jun-2017 Architectural 1 Approval 13-Jun-2017 C Resubmit
GLOBAL ALUMINUM
SYSTEMS CO. LTD. Revise &
Riyadh, KSA
8-Nov-2017 Architectural 1 Approval 19-Nov-2017 C Resubmit
GLOBAL ALUMINUM
SYSTEMS CO. LTD. Revise &
Riyadh, KSA
26-Dec-2017 Architectural 1 Approval 30-Dec-2017 C Resubmit
AL HAYAT
Revise &
BUILDING 11-Jun-2017 Architectural 1 Approval 14-Jun-2017 C Resubmit
MATERIALS CO.
Approved w/
TOB China 19-Jun-2017 Architectural 1 Approval 23-Aug-2017 B comments
Approved w/
Ibrahim Shaker 10-Jul-2017 Architectural 1 Approval 26-Jul-2017 B comments
Revise &
Sham net Trading 15-Jul-2017 Architectural 1 Approval 26-Jul-2017 C Resubmit
Revise &
SHAM NET TRADING 23-Oct-2017 Architectural 1 Approval 12-Nov-2017 C Resubmit
Approved w/
SHAM NET TRADING 5-Dec-2017 Architectural 1 Approval 21-Dec-2017 B comments
Revise &
Sham net Trading 16-Jul-2017 Architectural 1 Approval 26-Jul-2017 C Resubmit
Approved w/
6-Aug-2017 Architectural 1 Approval 7-Aug-2017 B comments
Approved w/
Alusystme 9-Aug-2017 Architectural 1 Approval 28-Aug-2017 B comments
CCCI Consultant
Creative for
Revise &
Construction 10-Aug-2017 Architectural 1 Approval 14-Sep-2017 C Resubmit
Industry Riyadh,
KSA
Approved w/
Ardh Al-Injaz Est 13-Aug-2017 Architectural 1 Approval 18-Sep-2017 B comments
Integrated Wood
Revise &
Industries Riyadh, 20-Aug-2017 Architectural 1 Approval 14-Sep-2017 C Resubmit
KSA
Approved w/
WAMCO 21-Sep-2017 Architectural 1 Approval 28-Sep-2017 B comments
Tameem M.Bin
Revise &
Ashry EST. Riyadh 21-Sep-2017 Architectural 1 Approval 2-Oct-2017 C Resubmit
KSA.
Isam Kabbani &
Partners Co. LTD. 26-Sep-2017 Architectural 1 Approval 2-Oct-2017 A Approved
Riyadh, KSA
Approved w/
Binex 28-Sep-2017 Architectural 1 Approval 7-Oct-2017 B comments
Approved w/
Binex 28-Sep-2017 Architectural 1 Approval 4-Oct-2017 B comments
Approved w/
Binex 28-Sep-2017 Architectural 1 Approval 4-Oct-2017 B comments
Revise &
Donglong China 30-Oct-2017 Architectural 1 Approval 5-Nov-2017 C Resubmit
Approved w/
Awal Bath Systems 4-Nov-2017 Architectural 1 Approval 12-Nov-2017 B comments
Revise &
Penta 4-Nov-2017 Architectural 1 Approval 12-Nov-2017 C Resubmit
Approved w/
GALCO Riyadh, KSA 8-Nov-2017 Architectural 1 Approval 19-Nov-2017 B comments
Approved w/
GALCO Riyadh, KSA 8-Nov-2017 Architectural 1 Approval 19-Nov-2017 B comments
Approved w/
GALCO Riyadh, KSA 8-Nov-2017 Architectural 1 Approval 19-Nov-2017 B comments
Approved w/
GALCO Riyadh, KSA 8-Nov-2017 Architectural 1 Approval 19-Nov-2017 B comments
Approved w/
GALCO Riyadh, KSA 9-Nov-2017 Architectural 1 Approval 19-Nov-2017 B comments
BAWANI CASEWORK Approved w/
FACTORY
9-Nov-2017 Architectural 1 Approval 26-Nov-2017 B comments
Revise &
GALCO Riyadh, KSA 9-Nov-2017 Architectural 1 Approval 19-Nov-2017 C Resubmit
Approved w/
SAUDI CERAMIC 13-Nov-2017 Architectural 1 Approval 4-Dec-2017 B comments
BPC – BUILDING
PRODUCT CO. Approved w/
JEDDAH, KSA
13-Nov-2017 Architectural 1 Approval 20-Nov-2017 B comments
Asiklar Bldg. Product Revise &
Architon
14-Nov-2017 Architectural 1 Approval 19-Nov-2017 C Resubmit
Bawani CaSEWORK
Approved w/
FACTORY Riyadh, 27-Nov-2017 Architectural 1 Approval 4-Dec-2017 B comments
KSA
Arbian Building
Chemical Factory 5-Dec-2017 Architectural 1 Approval 18-Dec-2017 E Rejected
Jeddah KSA
Approved w/
Alshawaf Int'l Co 18-Dec-2017 Architectural 1 Approval 25-Dec-2017 B comments
Approved w/
Alshawaf Int'l. Co 21-Dec-2017 Architectural 1 Approval 25-Dec-2017 B comments
Approved w/
Alshawaf Int'l. Co 20-Feb-2018 Architectural 1 Approval 24-Feb-2018 B comments
Revise &
Al Shawaf Int'l. Co. 6-Jan-2018 Architectural 1 Approval 15-Jan-2018 C Resubmit
ALAMDAR
VAPOTHERM CO. 7-Jan-2018 Architectural 1 Approval 15-Jan-2018 E Rejected
LTD
United Mining
Approved w/
Industries 22-Jan-2018 Architectural 1 Approval 27-Jan-2018 B comments
Jeddah
Wunsch Plaster
Factory
6-Feb-2018 Architectural 1 Approval 12-Feb-2018 A Approved
Wunsch Plaster
Factory
6-Feb-2018 Architectural 1 Approval 12-Feb-2018 A Approved
Al Ghamdi Co.
26-Feb-2018 Architectural 1 Approval
IDEAL
1 - Neprolast
2-
Approved w/
Sappco 23-Jan-2017 Civil 1 Approval 31-Jan-2017 B comments
3 - Al-
Tamam
WAMCO ( Wadi
Revise &
Maramer Trading 23-Feb-2017 Civil 1 Approval 27-Feb-2017 C Resubmit
Group)
Revise &
Gurbetciler 28-Feb-2017 Civil 1 Approval 2-Mar-2017 C Resubmit
Approved w/
6-Mar-2017 Civil 1 Approval 7-Mar-2017 B comments
1. Future Pipe,
Approved w/
27-Feb-2017 Civil 1 Approval 1-Mar-2017 B comments
2.
Almadarat Pipe
Revise &
ALMUNIF PIPE MMP 12-Mar-2017 Civil 1 Approval 14-Mar-2017 C Resubmit
Approved w/
AL MUNIF PIPE 10-Apr-2017 Civil 1 Approval 13-Apr-2017 B comments
Revise &
Amiantit 22-Jan-2017 Civil 1 Approval 31-Jan-2017 C Resubmit
Approved w/
ALMUNIF PIPE 22-Mar-2017 Civil 1 Approval 27-Mar-2017 B comments
Revise &
Saudi Cast 22-Apr-2017 Civil 1 Approval 1-May-2017 C Resubmit
Approved w/
Neproplast 29-Apr-2017 Civil 1 Approval 4-May-2017 B comments
Nagadi preformed
concrete factory
1-May-2017 Civil 1 Approval 14-May-2017 E Rejected
Revise &
Al Munif 3-May-2017 Civil 1 Approval 22-May-2017 C Resubmit
Approved w/
Al Munif 25-May-2017 Civil 1 Approval 30-May-2017 B comments
Approved w/
Texofib 8-May-2017 Civil 1 Approval 20-May-2017 B comments
Saudi Valve
Revise &
Manufacturing 11-May-2017 Civil 1 Approval 17-May-2017 C Resubmit
( AVK)
Saudi Valve
Approved w/
Manufacturing 6-Jun-2017 Civil 1 Approval 15-Jun-2017 B comments
( AVK)
Saudi Valve
Revise &
Manufacturing 22-May-2017 Civil 1 Approval 25-May-2017 C Resubmit
( AVK)
Saudi Valve
Manufacturing 31-May-2017 Civil 1 Approval 3-Jun-2017 A Approved
( AVK)
Approved w/
Al Wasail 1-Jun-2017 Civil 1 Approval 4-Jun-2017 B comments
Revise &
AL Munif 23-May-2017 Civil 1 Approval 25-May-2017 C Resubmit
Approved w/
AL Munif 27-May-2017 Civil 1 Approval 3-Jun-2017 B comments
Approved w/
Elift Arabian Factory 27-May-2017 Civil 1 Approval 8-Jun-2017 B comments
Saudi Valve
Revise &
Manufacturing 5-Jul-2017 Civil 1 Approval 10-Jul-2017 C Resubmit
( AVK)
Saudi Valve
Manufacturing 13-Jul-2017 Civil 1 Approval 1-Aug-2017 A Approved
( AVK)
Revise &
Sika 25-Jul-2017 Civil 1 Approval 29-Jul-2017 C Resubmit
Approved w/
Sika 6-Aug-2017 Civil 1 Approval 7-Aug-2017 B comments
Approved w/
Basf 25-Jul-2017 Civil 1 Approval 31-Jul-2017 B comments
Approved w/
Basf 25-Jul-2017 Civil 1 Approval 31-Jul-2017 B comments
Approved w/
Basf 27-Jul-2017 Civil 1 Approval 31-Jul-2017 B comments
Revise &
Basf 27-Jul-2017 Civil 1 Approval 31-Jul-2017 C Resubmit
Revise &
Basf 27-Jul-2017 Civil 1 Approval 31-Jul-2017 C Resubmit
Revise &
Basf 6-Aug-2017 Civil 1 Approval 7-Aug-2017 C Resubmit
Approved w/
DCP 23-Aug-2017 Civil 1 Approval 26-Aug-2017 B comments
Revise &
ABNI 42999 Civil ### Approval 26-Sep-2017 C Resubmit
Saudi Cyprus Approved w/
Foundries (SCF)
23-Oct-2017 Civil 1 Approval 28-Oct-2017 B comments
Approved w/
IFCO 23-Oct-2017 Civil 1 Approval 28-Oct-2017 B comments
Revise &
Naffco 4-Nov-2017 Civil 1 Approval 8-Nov-2017 C Resubmit
Saudi Valve
Revise &
Manufacturing 29-Nov-2017 Civil 1 Approval 7-Dec-2017 C Resubmit
( SVM)
Saudi Valve
Revise &
Manufacturing 17-Dec-2017 Civil 1 Approval 21-Dec-2017 C Resubmit
( SVM)
Saudi Valve
Approved w/
Manufacturing 28-Dec-2017 Civil 1 Approval 3-Jan-2018 B comments
( SVM)
Saudi Valve
Approved w/
Manufacturing 13-Jan-2018 Civil 1 Approval 20-Jan-2018 B comments
( SVM)
AL Khamisain Revise &
Hardware Trading
5-Dec-2017 Civil 1 Approval 10-Dec-2017 C Resubmit
AL Khamisain Approved w/
Hardware Trading
28-Dec-2017 Civil 1 Approval 1-Jan-2018 B comments
Approved w/
SODAMCO 18-Dec-2017 Civil 1 Approval 19-Dec-2017 B comments
Approved w/
Al Fanar 21-Jan-2018 Civil 1 Approval 25-Jan-2018 B comments
1- Al Abdul Karim
Holding Co
3- Al-Fozan
Electrical Materials
2-Saudi Electric
SupplyCo.
15-Apr-2017 Electrical 1 Approval 20-Apr-2017 E Rejected
3. Al
Fozan Electrical
Materials
1- A.A.Turki
Corporation 2- Al
Abdulkarim Holding
26-Jan-2017 Electrical 1 Approval 31-Jan-2017 A Approved
Co.
National Marketing
Est Co.Ltd
28-Jan-2017 Electrical 1 Approval 31-Jan-2017 A Approved
1-Saudi Electric
Supply Co.
Approved w/
2-Abdul Karin 2-Mar-2017 Electrical 1 Approval 8-Mar-2017 B comments
Holding Co
3-Abdul Karin
Holding Co
1-Saudi Electric
SupplyCo.
2-Saudi Electric
Revise &
SupplyCo. 2-Mar-2017 Electrical 1 Approval 8-Mar-2017 C Resubmit
3-Abdul
Karin Holding Co
4-Abdul Karin
Holding Co
1-Saudi Electric
SupplyCo.
2-Electric Approved w/
House
2-Mar-2017 Electrical 1 Approval 8-Mar-2017 B comments
3-Saudi Electric
Supply Co.
Abdul Karim
Holding Co.
7-Mar-2017 Electrical 1 Approval 15-Mar-2017 E Rejected
Revise &
Electric House 7-Mar-2017 Electrical 1 Approval 15-Mar-2017 C Resubmit
Approved w/
Electric House 27-Apr-2017 Electrical 1 Approval 4-May-2017 B comments
1. Electric House
Revise &
2. Abdul 7-Mar-2017 Electrical 1 Approval 15-Mar-2017 C Resubmit
Karim Holding Co.
Approved w/
Tabalasa 23-May-2017 Electrical 1 Approval 25-May-2017 B comments
1. AlAbdul
KarimHoldingCo.
2. Saudi Revise &
Electri Supply&Co.
8-Mar-2017 Electrical 1 Approval 15-Mar-2017 C Resubmit
3. Al Fozan
Electrical Materials
Al Abdulkarim Approved w/
Holding Co.
6-Aug-2017 Electrical 1 Approval 9-Aug-2017 B comments
Approved w/
Hrfa Special Skills 17-Oct-2017 Electrical 1 Approval 25-Oct-2017 B comments
Approved w/
Hrfa Special Skills 30-Oct-2017 Electrical 1 Approval 3-Dec-2017 B comments
Approved w/
HRFA Special Skills 31-Dec-2017 Electrical 1 Approval 20-Jan-2018 B comments
Approved w/
12-Feb-2017 Electrical 1 Approval 18-Feb-2017 B comments
Ssaudi Electric
Supply & Co.
12-Feb-2017 Electrical 1 Approval 18-Feb-2017 A Approved
1) Al Fozan Electrical
Materials
2) Al
Abdul Karim Holding 22-Apr-2017 Electrical 1 Approval 29-Apr-2017 E Rejected
Co.
3)Saudi
electric supply & Co.
Approved w/
Saudi Powertec. 24-Apr-2017 Electrical 1 Approval 18-May-2017 B comments
Revise &
Energy Shields 29-Jun-2017 Electrical 1 Approval 5-Jul-2017 C Resubmit
Revise &
Energy Shields 5-Oct-2017 Electrical 1 Approval 18-Oct-2017 C Resubmit
Approved w/
Energy Shields 27-Nov-2017 Electrical 1 Approval 27-Dec-2017 B comments
1-Khereiji
showrooms co. ltd.
2-Radya
International
25-Apr-2017 Electrical 1 Approval 4-May-2017 E Rejected
3-Al Abdulkarim
Holding Co.
1-Khereiji
showrooms co. ltd.
2-Radya Approved w/
International
27-May-2017 Electrical 1 Approval 31-May-2017 B comments
3-Al Abdulkarim
Holding Co.
Approved w/
Schneider/ Mots 29-Apr-2017 Electrical 1 Approval 18-May-2017 B comments
Approved w/
OSOS 4-May-2017 Electrical 1 Approval 27-May-2017 B comments
Revise &
OSOS 12-Jun-2017 Electrical 1 Approval 8-Jul-2017 C Resubmit
Revise &
OSOS 17-Jul-2017 Electrical 1 Approval 11-Sep-2017 C Resubmit
Approved w/
OSOS 6-Nov-2017 Electrical 1 Approval 2-Jan-2018 B comments
Revise &
ITMS 7-May-2017 Electrical 1 Approval 23-May-2017 C Resubmit
For
Hoshan 8-May-2017 Electrical 1 Approval 27-May-2017 D Information
Approved w/
Hoshan 22-Nov-2017 Electrical 1 Approval 7-Dec-2017 B comments
The Saudi
Transformers Co.Ltd 9-May-2017 Electrical 1 Approval 25-May-2017 E Rejected
(STC)
Saudi Controls Ltd 11-May-2017 Electrical 1 Approval 29-May-2017 E Rejected
Revise &
Saudi Controls Ltd 7-Aug-2017 Electrical 1 Approval 29-Aug-2017 C Resubmit
Al Fanar 20-May-2017 Electrical 1 Approval 25-May-2017 E Rejected
Approved w/
Al Fanar 6-Dec-2017 Electrical 1 Approval 20-Jan-2018 B comments
Approved w/
Al Fanar 15-May-2017 Electrical 1 Approval 18-May-2017 B comments
Factory of Alnoor
Revise &
Alhady Company for 6-Jun-2017 Electrical 1 Approval 11-Jun-2017 C Resubmit
Energy
Factory of Alnoor
Revise &
Alhady Company for 23-Jul-2017 Electrical 1 Approval 3-Aug-2017 C Resubmit
Energy
Factory of Alnoor
Approved w/
Alhady Company for 22-Nov-2017 Electrical 1 Approval 7-Dec-2017 B comments
Energy
Arab Builders for
Telecommunication For
& Security Services
23-May-2017 Electrical 2 Information 27-May-2017 D Information
(ABTSS)
Approved w/
ABTSS 22-Nov-2017 Electrical 1 Approval 13-Dec-2017 B comments
Al Abdulkarim
Holding Co.
7-Jun-2017 Electrical 1 Approval 14-Jun-2017 A Approved
Al Abdulkarim Approved w/
Holding Co.
18-Jun-2017 Electrical 1 Approval 4-Jul-2017 B comments
Revise &
OSOS 6-Aug-2017 Electrical 1 Approval 22-Aug-2017 C Resubmit
Approved w/
OSOS 18-Dec-2017 Electrical 1 Approval 27-Dec-2017 B comments
Revise &
ISSA Telecom 6-Aug-2017 Electrical 1 Approval 9-Aug-2017 C Resubmit
Approved w/
ISSA Telecom 10-Sep-2017 Electrical 1 Approval 17-Sep-2017 B comments
Revise &
EW Expertsways 9-Sep-2017 Electrical 1 Approval 27-Sep-2017 C Resubmit
Revise &
EW Expertsways 17-Oct-2017 Electrical 1 Approval 31-Oct-2017 C Resubmit
Approved w/
EW Expertsways 18-Dec-2017 Electrical 1 Approval 1-Jan-2018 B comments
Approved w/
MK-Honeywell 27-Aug-2017 Electrical 1 Approval 19-Sep-2017 B comments
Approved w/
Bahra Cable 27-Aug-2017 Electrical 1 Approval 13-Sep-2017 B comments
Approved w/
GEDAC 19-Sep-2017 Electrical 1 Approval 30-Sep-2017 B comments
Revise &
Al Fanar 27-Sep-2017 Electrical 1 Approval 4-Oct-2017 C Resubmit
Approved w/
Al Fanar 5-Dec-2017 Electrical 1 Approval 24-Dec-2017 B comments
Approved w/
Al Fanar 29-Oct-2017 Electrical 1 Approval 7-Nov-2017 B comments
United Technology
of Electric
Revise &
Substation & 43037 Electrical ### Approval 4-Nov-2017 C Resubmit
Switchgears Co.
(USSG)
United Technology
of Electric
Approved w/
Substation & 43076 Electrical ### Approval 19-Dec-2017 B comments
Switchgears Co.
(USSG)
Approved w/
Contactum Alfanar 30-Oct-2017 Electrical 1 Approval 15-Nov-2017 B comments
Revise &
Axis 2-Nov-2017 Electrical 1 Approval 11-Dec-2017 C Resubmit
Approved w/
ABB 26-Nov-2017 Electrical 1 Approval 23-Dec-2017 B comments
Al Zamil (SSP-OZG
Wheatland)
16-Dec-2017 Electrical 1 Approval 24-Dec-2017 A Approved
Al Wasail Industrial
Co
16-Dec-2017 Electrical 1 Approval 24-Dec-2017 A Approved
National Marketing
Est Co.Ltd
26-Jan-2017 Telecom 1 Approval 31-Jan-2017 A Approved
Revise &
SETRA 19-Apr-2017 Low Current 1 Approval 7-May-2017 C Resubmit
Approved w/
Neproplast 27-Aug-2017 Low Current 1 Approval 11-Sep-2017 B comments
ITMS Information
Tecnology Revise &
Management
28-Dec-2017 Low Current 1 Approval 3-Jan-2018 C Resubmit
Services Co. Ltd
ITMS Information
Tecnology
Management
24-Jan-2018 Low Current 1 Approval 28-Jan-2018 A Approved
Services Co. Ltd
Alwasail Industrial
Company
15-Feb-2018 Low Current 1 Approval 21-Feb-2018 A Approved
Elbadr Industrial
Revise &
Supplier (Jeddah 19-Mar-2017 HVAC 1 Approval 23-Mar-2017 C Resubmit
KSA)
Mariam Trading Revise &
Company
19-Mar-2017 HVAC 1 Approval 23-Mar-2017 C Resubmit
Al Bawani Duct
Factory Riyadh KSA
15-May-2017 HVAC 1 Approval 21-May-2017 A Apporved
Al Bawani Duct
Factory Riyadh KSA
15-May-2017 HVAC 1 Approval 22-May-2017 A Apporved
Zamil Air
Conditioners
7-Jun-2017 HVAC 1 Approval 3-Jul-2017 E Rejected
Alsalem Johnson
Controls
7-Jun-2017 HVAC 1 Approval 5-Jul-2017 E Rejected
Revise &
Gulf Grills Co 10-Jun-2017 HVAC 1 Approval 19-Jun-2017 C Resubmit
Engineering Supplies Revise &
Est.
2-Aug-2017 HVAC 1 Approval 7-Aug-2017 C Resubmit
Revise &
Gulf Grills Co 9-Aug-2017 HVAC 1 Approval 14-Aug-2017 C Resubmit
Revise &
Fawaz Co 18-Jun-2017 HVAC 1 Approval 9-Jul-2017 C Resubmit
Three Elements Revise &
Trading Est
2-Aug-2017 HVAC 1 Approval 7-Aug-2017 C Resubmit
Al Saadeh Trading Revise &
Est.
20-Jun-2017 HVAC 1 Approval 9-Jul-2017 C Resubmit
Approved w/
Solver 12-Aug-2017 HVAC 1 Approval 20-Aug-2017 B comments
M.M.seiary Trading
Est.
25-Jul-2017 HVAC 1 Approval 27-Jul-2017 A Apporved
Revise &
Dallah Trading co 10-Aug-2017 HVAC 1 Approval 16-Aug-2017 C Resubmit
Three Elements Revise &
Trading Est
10-Aug-2017 HVAC 1 Approval 15-Aug-2017 C Resubmit
Three Elements Revise &
Trading Est
11-Nov-2017 HVAC 1 Approval 16-Nov-2017 C Resubmit
M/S Khalid asad
Revise &
jamjoom 23-Oct-2017 HVAC 1 Approval 4-Nov-2017 C Resubmit
Commercial Est.
Revise &
AMEREX 5-Apr-2017 Mechanical 1 Approval 12-Apr-2017 C Resubmit
Approved w/
AMEREX 18-May-2017 Mechanical 1 Approval 24-May-2017 B comments
1. HITACHI
Revise &
2. 10-Apr-2017 Mechanical 1 Approval 12-Apr-2017 C Resubmit
BENKEN
Approved w/
Solver 19-Apr-2017 Mechanical 1 Approval 23-Apr-2017 B comments
Approved w/
Naffco 31-Oct-2017 Mechanical 1 Approval 8-Nov-2017 B comments
Revise &
ALMUNIF PIPE MMP 12-Mar-2017 Plumbing 1 Approval 15-Mar-2017 C Resubmit
Approved w/
ALMUNIF PIPE MMP 22-Mar-2017 Plumbing 1 Approval 27-Mar-2017 B comments
Approved w/
ALMUNIF PIPE MMP 6-Jul-2017 Plumbing 1 Approval 11-Jul-2017 B comments
Approved w/
SAPPCO 12-Mar-2017 Plumbing 1 Approval 15-Mar-2017 B comments
Approved w/
Aplaco, Sappco 6-Jul-2017 Plumbing 1 Approval 11-Jul-2017 B comments
Revise &
NEPROPLAST 12-Mar-2017 Plumbing 1 Approval 14-Mar-2017 C Resubmit
Approved w/
ALMUNIF PIPE MMP 12-Mar-2017 Plumbing 1 Approval 15-Mar-2017 B comments
Revise &
ALMUNIF PIPE MMP 12-Mar-2017 Plumbing 1 Approval 14-Mar-2017 C Resubmit
Al-Jazera Factories
For steel Products 22-Mar-2017 Plumbing 1 Approval 26-Mar-2017 A Approved
Co. Ltd ( JASCO )
Universal Building
Material
19-Mar-2017 Plumbing 1 Approval 27-Mar-2017 E Rejected
Mariam Trading
Company
19-Mar-2017 Plumbing 1 Approval 27-Mar-2017 E Rejected
Tahweel Integrated
Company
25-Mar-2017 Plumbing 1 Approval 29-Mar-2017 A Approved
Mechanical &
Revise &
Chemical Supplies 27-Mar-2017 Plumbing 1 Approval 29-Mar-2017 C Resubmit
Co. (MCC)
Revise &
Binex 16-Apr-2017 Plumbing 1 Approval 18-Apr-2017 C Resubmit
Approved w/
Dylan Co.Ltd 6-Jun-2017 Plumbing 1 Approval 13-Jun-2017 B comments
Revise &
Saudi Cast 8-Jun-2017 Plumbing 1 Approval 19-Jun-2017 C Resubmit
Revise &
Saudi Cast 26-Jul-2017 Plumbing 1 Approval 7-Aug-2017 C Resubmit
Revise &
Saudi Cast 20-Aug-2017 Plumbing 1 Approval 28-Aug-2017 C Resubmit
Approved w/
Saudi Cast 4-Nov-2017 Plumbing 1 Approval 12-Nov-2017 B comments
Moudi A.Al-Ajmi
Trading Est.
8-Jun-2017 Plumbing 1 Approval 3-Jul-2017 E Rejected
Modern Time
Revise &
Technical System / 3-Aug-2017 Plumbing 1 Approval 8-Aug-2017 C Resubmit
Rheem
Approved w/
Binex 18-Jun-2017 Plumbing 1 Approval 6-Jul-2017 B comments
Revise &
Econosto Valves 1-Jul-2017 Plumbing 1 Approval 8-Jul-2017 C Resubmit
Ahamed A. Alhashim
Sons Co & Partner
10-Jul-2017 Plumbing 1 Approval 17-Jul-2017 E Rejected
Approved w/
solver 12-Aug-2017 Plumbing 1 Approval 20-Aug-2017 B comments
Al-Hayat Building
Materials Co.
20-Jul-2017 Plumbing 1 Approval 27-Jul-2017 A Approved
Revise &
Josam 20-Jul-2017 Plumbing 1 Approval 27-Jul-2017 C Resubmit
Revise &
Cosmoplast 13-Aug-2017 Plumbing 1 Approval 16-Aug-2017 C Resubmit
A.Abunayyan Approved w/
Trading Corp
20-Aug-2017 Plumbing 1 Approval 29-Aug-2017 B comments
Saudi Valve
Manufacturing Co.
14-Nov-2017 Plumbing 1 Approval 16-Nov-2017 A Approved
1-Attien Steel
Company Ltd 2-
Bawan Metal
Approved w/
Industries 3- 19-Jan-2017 Structural 1 Approval 30-Jan-2017 B comments
Brc Industrial
Company 4-
Steefco
Bawan Metal
Industries
18-Mar-2017 Structural 1 Approval 21-Mar-2017 A Approved
Approved w/
19-Jan-2017 Structural 1 Approval 30-Jan-2017 B comments
Al-Fozan 24-Jan-2017 Structural 1 Approval 26-Jan-2017 A Approved
Saudi ReadyMix
Concrete Co. Ltd.
24-Jan-2017 Structural 1 Approval 30-Jan-2017 A Approved
1- Sika Saudiarabia
Co.Ltd Approved w/
2-
24-Jan-2017 Structural 1 Approval 26-Jan-2017 B comments
Aqua Shielo bx
Approved w/
25-Jan-2017 Structural 1 Approval 30-Jan-2017 B comments
Approved w/
CIC 29-Oct-2017 Structural 1 Approval 31-Oct-2017 B comments
Approved w/
SIKA Company Ltd. 1-Apr-2017 Structural 1 Approval 5-Apr-2017 B comments
Approved w/
SIKA Company Ltd. 1-Apr-2017 Structural 1 Approval 5-Apr-2017 B comments
Fosam Company
Limited (FOSROC)
20-Apr-2017 Structural 1 Approval 26-Apr-2017 A Approved
Revise &
Rajhi Steel 27-Apr-2017 Structural 1 Approval 9-May-2017 C Resubmit
Approved w/
Rajhi Steel 15-Aug-2017 Structural 1 Approval 12-Sep-2017 B comments
Dermabit
Waterproofing 29-May-2017 Structural 1 Approval 3-Jun-2017 A Approved
Industries
Awazel-Arabian
Waterproofing 29-May-2017 Structural 1 Approval 3-Jun-2017 E Rejected
Industries Co.
WAMCO (Wadi
Approved w/
Maramer Trading 25-Jul-2017 Structural 1 Approval 27-Jul-2017 B comments
Group)
DCP (Don
Approved w/
Construction 27-Jul-2017 Structural 1 Approval 29-Jul-2017 B comments
Products)
Approved w/
Binex 30-Jul-2017 Structural 1 Approval 1-Aug-2017 B comments
Al - Bassami Group
Co.
7-Nov-2017 Structural 1 Approval 9-Nov-2017 A Approved
INTERNEL REFERENCE
NO REMARKS
COMMENTS
KHEP-MS-AR-0001-00 Closed
KHEP-MS-AR-0002-00 Closed
KHEP-MS-AR-0003-00 Closed
KHEP-MS-AR-0004-00 Closed
KHEP-MS-AR-0005-00 Closed
KHEP-MS-AR-0006-00 Closed
KHEP-MS-AR-0007-00 Closed
KHEP-MS-AR-0008-00 Closed
KHEP-MS-AR-0008-01 Closed
KHEP-MS-AR-0008-02 Closed
KHEP-MS-AR-0009-00 Closed
KHEP-MS-AR-0010-00 Closed
KHEP-MS-AR-0011-00 Closed
KHEP-MS-AR-0012-00 Closed
KHEP-MS-AR-0013-00 Closed
KHEP-MS-AR-0013-01 Closed
KHEP-MS-AR-0014-00 Closed
KHEP-MS-AR-0014-01 Closed
KHEP-MS-AR-0015-00 Closed
KHEP-MS-AR-0015-01 Closed
KHEP-MS-AR-0016-00 Closed
KHEP-MS-AR-0017-00 Closed
KHEP-MS-AR-0018-00 Closed
KHEP-MS-AR-0019-00 Closed
KHEP-MS-AR-0020-00 Closed
KHEP-MS-AR-0021-00 Closed
KHEP-MS-AR-0021-01 Closed
KHEP-MS-AR-0021-02 Closed
KHEP-MS-AR-0022-00 Closed
KHEP-MS-AR-0023-00 Closed
KHEP-MS-AR-0024-00 Closed
KHEP-MS-AR-0025-00 Closed
KHEP-MS-AR-0026-00 Closed
KHEP-MS-AR-0027-00 Closed
KHEP-MS-AR-0028-00 Closed
KHEP-MS-AR-0029-00 Closed
KHEP-MS-AR-0030-00 Closed
KHEP-MS-AR-0031-00 Closed
KHEP-MS-AR-0032-00 Closed
KHEP-MS-AR-0033-00 Closed
KHEP-MS-AR-0033-01 Closed
KHEP-MS-AR-0034-00 Closed
KHEP-MS-AR-0035-00 Closed
KHEP-MS-AR-0036-00 Closed
KHEP-MS-AR-0037-00 Closed
KHEP-MS-AR-0038-00 Closed
KHEP-MS-AR-0039-00 Closed
KHEP-MS-AR-0040-00 Closed
KHEP-MS-AR-0041-00 Closed
KHEP-MS-AR-0042-00 Closed
KHEP-MS-AR-0042-01 Closed
KHEP-MS-AR-0043-00 Closed
KHEP-MS-AR-0044-00 Closed
KHEP-MS-AR-0045-00 Closed
KHEP-MS-AR-0046-00 Closed
KHEP-MS-AR-0047-00 Closed
KHEP-MS-AR-0048-00 Closed
KHEP-MS-AR-0049-00 Closed
KHEP-MS-AR-0049-01 Closed
KHEP-MS-AR-0049-02 Closed
KHEP-MS-AR-0050-00 Closed
KHEP-MS-AR-0051-00 Closed
KHEP-MS-AR-0051-01 Closed
KHEP-MS-AR-0051-02 Closed
KHEP-MS-AR-0052-00 Closed
KHEP-MS-AR-0052-01 Closed
KHEP-MS-AR-0053-00 Closed
KHEP-MS-AR-0054-00 Closed
KHEP-MS-AR-0055-00 Closed
KHEP-MS-AR-0056-00 Closed
KHEP-MS-AR-0057-00 Closed
KHEP-MS-AR-0057-01 Closed
KHEP-MS-AR-0058-00 Closed
KHEP-MS-AR-0058-01 Closed
KHEP-MS-AR-0058-02 Closed
KHEP-MS-AR-0059-00 Closed
KHEP-MS-AR-0060-00 Closed
KHEP-MS-AR-0060-01 Closed
KHEP-MS-AR-0061-00 Closed
KHEP-MS-AR-0062-00 Closed
KHEP-MS-AR-0063-00 Closed
KHEP-MS-AR-0063-01 Closed
KHEP-MS-AR-0064-00 Closed
KHEP-MS-AR-0064-01 Closed
KHEP-MS-AR-0064-02 Closed
KHEP-MS-AR-0065-00 Closed
KHEP-MS-AR-0066-00 Closed
KHEP-MS-AR-0067-00 Closed
KHEP-MS-AR-0068-00 Closed
KHEP-MS-AR-0069-00 Closed
KHEP-MS-AR-0070-00 Closed
KHEP-MS-AR-0071-00 Closed
KHEP-MS-AR-0072-00 Closed
KHEP-MS-AR-0073-00 Closed
KHEP-MS-AR-0073-01 Closed
KHEP-MS-AR-0074-00 Closed
KHEP-MS-AR-0075-00 Closed
KHEP-MS-AR-0076-00 Closed
KHEP-MS-AR-0077-00 Closed
KHEP-MS-AR-0078-00 Closed
KHEP-MS-AR-0079-00 Closed
KHEP-MS-AR-0080-00 Closed
KHEP-MS-AR-0081-00 Closed
KHEP-MS-AR-0082-00 Closed
KHEP-MS-AR-0083-00 Closed
KHEP-MS-AR-0084-00 Closed
KHEP-MS-AR-0084-01 Closed
KHEP-MS-AR-0085-00 Closed
KHEP-MS-AR-0085-01 Closed
KHEP-MS-AR-0086-00 Closed
KHEP-MS-AR-0087-00 Closed
KHEP-MS-AR-0088-00 Closed
KHEP-MS-AR-0089-00 Closed
KHEP-MS-AR-0090-00 Closed
KHEP-MS-AR-0091-00 Closed
KHEP-MS-AR-0092-00 Closed
KHEP-MS-AR-0093-00 Closed
KHEP-MS-AR-0094-00 Closed
KHEP-MS-AR-0094-01 Closed
KHEP-MS-AR-0095-00 Closed
KHEP-MS-AR-0097-00 Closed
KHEP-MS-AR-0097-00 Closed
KHEP-MS-AR-0098-00 Closed
KHEP-MS-AR-0099-00 Closed
KHEP-MS-AR-0100-00
Closed
(KHEP-RFC-AR-0016-01)
KHEP-MS-AR-0101-00 Closed
KHEP-MS-AR-0102-00 Closed
KHEP-MS-AR-0103-00 Closed
KHEP-MS-AR-0104-00 Closed
KHEP-MS-AR-0105-00 Closed
KHEP-MS-AR-0106-00 Closed
KHEP-MS-AR-0107-00 Closed
KHEP-MS-AR-0107-01 Closed
KHEP-MS-AR-0108-00 Closed
KHEP-MS-AR-0108-01 Closed
KHEP-MS-AR-0109-00
KHEP-RFC-AR-0029-00 Closed
(Ref: Specd Section 05 5000)
KHEP-MS-AR-0110-00 Closed
KHEP-MS-AR-0110-01
Closed
SPECS SECTION 07 1300
KHEP-MS-AR-0111-00 Closed
KHEP-MS-AR-0112-00 Closed
KHEP-MS-AR-0113-00 Closed
KHEP-MS-AR-0114-00 Closed
KHEP-MS-AR-0115-00 Closed
KHEP-MS-AR-0116-00 Closed
KHEP-MS-AR-0117-00 Closed
KHEP-MS-AR-0118-00 Closed
KHEP-MS-AR-0119-00
Closed
SPECS Section 09 2300
KHEP-MS-AR-0120-00
Closed
SPECS Section 09 2400
KHEP-MS-AR-0121-00
SPECS Section 12 3600
KHEP-MS-AR-0122-00
Open
SPECS Section 10 2800
KHEP-MA-33-0007-00 Closed
KHEP-MS-CI-0002-00 Closed
KHEP-MS-CI-0003-00 Closed
KHEP-MS-CI-0003-01 Closed
KHEP-MS-CI-0003-02 Closed
KHEP-MS-CL-0001-00 Closed
KHEP-MS-CI-0005-00 Closed
KHEP-MS-CI-0005-01 Closed
KHEP-MS-CI-0005-02 Closed
KHEP-MA-33-0006-00 Closed
KHEP-MS-CI-0007-00 Closed
KHEP-MS-CI-0008-00 Closed
KHEP-MS-CI-0008-01 Closed
KHEP-MS-CI-0009-00 Closed
KHEP-MS-CI-0010-00 Closed
KHEP-MS-CI-0011-00 Closed
KHEP-MS-CI-0012-00 Closed
KHEP-MS-CI-0013-00 Closed
KHEP-MS-CI-0014-00 Closed
KHEP-MS-CI-0014-01 Closed
KHEP-MS-CI-0015-00 Closed
KHEP-MS-CI-0016-00 Closed
KHEP-MS-CI-0016-01 Closed
KHEP-MS-CI-0017-00 Closed
KHEP-MS-CI-0017-01 Closed
KHEP-MS-CI-0018-00 Closed
KHEP-MS-CI-0018-01 Closed
KHEP-MS-CI-0019-00 Closed
KHEP-MS-CI-0019-01 Closed
KHEP-MS-CI-0020-00 Closed
KHEP-MS-CI-0021-00 Closed
KHEP-MS-CI-0022-00 Closed
KHEP-MS-CI-0023-00 Closed
KHEP-MS-CI-0024-00 Closed
KHEP-MS-CI-0025-00 Closed
KHEP-MS-CI-0026-00 Closed
KHEP-MS-CI-0026-01 Closed
KHEP-MS-CI-0027-00 Closed
KHEP-MS-CI-0027-01 Closed
KHEP-MS-CI-0028-00 Closed
KHEP-MS-CI-0029-00 Closed
KHEP-MS-CI-0030-00 Closed
KHEP-MS-CI-0030-01 Closed
KHEP-MS-CI-0031-00 Closed
KHEP-MS-CI-0031-01 Closed
KHEP-MS-CI-0032-00 Closed
KHEP-MS-CI-0032-01 Closed
KHEP-MS-CI-0033-00 Closed
KHEP-MS-CI-0034-00 Closed
KHEP-MS-CI-0035-00 Closed
KHEP-MS-CI-0036-00 Closed
KHEP-MS-CI-0036-01 Closed
KHEP-MS-CI-0037-00 Closed
KHEP-MS-CI-0037-01 Closed
KHEP-MS-CI-0038-00 Closed
KHEP-MS-CI-0039-00 Closed
KHEP-MS-CI-0040-00 Closed
KHEP-MS-CI-0041-00 Closed
KHEP-MS-CI-0042-00 Closed
KHEP-MS-CI-0043-00 Closed
KHEP-MS-CI-0044-00 Closed
KHEP-MS-CI-0045-00 Closed
KHEP-MS-CI-0046-00 Closed
KHEP-MS-CI-0047-00 Closed
KHEP-MS-CI-0048-00 Closed
KHEP-MS-CI-0049-00 Closed
KHEP-MS-CI-0050-00 Closed
KHEP-MS-CI-0050-01 Closed
KHEP-MS-CI-0050-02 Closed
KHEP-MS-CI-0050-03 Closed
KHEP-MS-CI-0051-00 Closed
KHEP-MS-CI-0051-01 Closed
KHEP-MS-CI-0052-00 Closed
KHEP-MS-CI-0052-01 Closed
KHEP-MS-CI-0053-00 Closed
KHEP-MS-CI-0054-00 Closed
KHEP-MS-CI-0055-00 Closed
KHEP-MS-CI-0056-00 Closed
KHEP-MA-26-0001-00 Closed
KHEP-MA-26-0001-00 Closed
KHEP-MS-EL-0001-02 Closed
KHEP-MS-EL-0001-03 Closed
KHEP-MA-26-0002-00 Closed
KHEP-MA-26-0003-00 Closed
KHEP-MA-26-0004-00 Closed
KHEP-MA-26-0005-00 Closed
KHEP-MA-27-0002-00 Closed
KHEP-MS-EL-0006-00 Closed
KHEP-MS-EL-0007-00 Closed
KHEP-MS-EL-0008-00 Closed
KHEP-MS-EL-0009-00 Closed
KHEP-MS-EL-0009-01 Closed
KHEP-MS-EL-0009-02 Closed
KHEP-MS-EL-0010-00 Closed
KHEP-MS-EL-0011-00 Closed
KHEP-MS-EL-0012-00 Closed
KHEP-MS-EL-0012-01 Closed
KHEP-MS-EL-0013-00 Closed
KHEP-MS-EL-0013-01 Closed
KHEP-MS-EL-0014-00 Closed
KHEP-MS-EL-0014-01 Closed
KHEP-MS-EL-0015-00 Closed
KHEP-MS-EL-0016-00 Closed
KHEP-MS-EL-0016-01 Closed
KHEP-MS-EL-0017-00 Closed
KHEP-MS-EL-0017-01 Closed
KHEP-MS-EL-0018-00 Closed
KHEP-MS-EL-0018-01 Closed
KHEP-MS-EL-0018-02 Closed
KHEP-MS-EL-0019-00 Closed
KHEP-MS-EL-0020-00 Closed
KHEP-MS-EL-0020-01 Closed
KHEP-MS-EL-0020-02 Closed
KHEP-MS-EL-0020-03 Closed
KHEP-MS-EL-0020-04
Related Doc: Closed
KHEP-OT-0109-00
KHEP-MS-EL-0021-00 Closed
KHEP-MS-EL-0022-00 Closed
KHEP-MS-EL-0023-00 Closed
KHEP-MS-EL-0024-00 Closed
KHEP-MS-EL-0025-00 Closed
KHEP-MS-EL-0026-00 Closed
KHEP-MS-EL-0026-01 Closed
KHEP-MS-EL-0026-02 Closed
KHEP-MS-EL-0026-03 Closed
KHEP-MS-EL-0026-04 Closed
KHEP-MS-EL-0027-00 Closed
KHEP-MS-EL-0027-01 Closed
KHEP-MS-EL-0028-00 Closed
KHEP-MS-EL-0029-00 Closed
KHEP-MS-EL-0029-01 Closed
KHEP-MS-EL-0029-02 Closed
KHEP-MS-EL-0029-03 Closed
KHEP-MS-EL-0029-04 Closed
KHEP-MS-EL-0030-00 Closed
KHEP-MS-EL-0031-00 Closed
KHEP-MS-EL-0031-01 Closed
KHEP-MS-EL-0032-00 Closed
KHEP-MS-EL-0032-01 Closed
KHEP-MS-EL-0032-02 Closed
KHEP-MS-EL-0033-00 Closed
KHEP-MS-EL-0034-00 Closed
KHEP-MS-EL-0034-01 Closed
KHEP-MS-EL-0035-00 Closed
KHEP-MS-EL-0035-01 Closed
KHEP-MS-EL-0036-00 Closed
KHEP-MS-EL-0037-00 Closed
KHEP-MS-EL-0037-01 Closed
KHEP-MS-EL-0037-02 Closed
KHEP-MS-EL-0037-03 Closed
KHEP-MS-EL-0038-00 Closed
KHEP-MS-EL-0038-01 Closed
KHEP-MS-EL-0038-02 Closed
KHEP-MS-EL-0039-00 Closed
KHEP-MS-EL-0040-00 Closed
KHEP-MS-EL-0041-00 Closed
KHEP-MS-EL-0042-00 Closed
KHEP-MS-EL-0043-00 Closed
KHEP-MS-EL-0044-00 Closed
KHEP-MS-EL-0044-01 Closed
KHEP-MS-EL-0045-00 Closed
KHEP-MS-EL-0045-01 Closed
KHEP-MS-EL-0046-00 Closed
KHEP-MS-EL-0046-01 Closed
KHEP-MS-EL-0046-02 Closed
KHEP-MS-EL-0046-03 Closed
KHEP-MS-EL-0047-00 Closed
KHEP-MS-EL-0048-00 Closed
KHEP-MS-EL-0049-00 Closed
KHEP-MS-EL-0050-00 Closed
KHEP-MS-EL-0051-00 Closed
KHEP-MS-EL-0052-00
Closed
(KHEP-OT-0082-00)
KHEP-MS-EL-0053-00
Closed
(KHEP-OT-0046-00)
KHEP-RFC-EL-0024-00
Closed
(KHEP-OT-0046-00)
KHEP-MS-EL-0054-00
Closed
(KHEP-OT-0046-00)
KHEP-MS-EL-0054-01
Closed
(KHEP-OT-0046-00)
KHEP-MS-EL-0055-00
(KHEP-OT-0040-01 and
Closed
KHEP-RFC-EL-0031-00 and
KHEP-RFC-EL-0031-01)
KHEP-MS-EL-0055-01 Closed
KHEP-MS-EL-0056-00
(KHEP-OT-0054-00 and Closed
KHEP-OT-0085-00 )
KHEP-MS-EL-0057-00 Closed
KHEP-MS-EL-0058-00 Closed
KHEP-MS-EL-0059-00 Closed
KHEP-MS-EL-0060-00 Closed
KHEP-MS-EL-0061-00
Related Document: KHEP- Closed
MS-EL-0020-00
KHEP-MS-EL-0062-00
Related Document: KHEP- Closed
RFC-EL-0031-00
KHEP-MS-EL-0063-00
Related Document: KHEP- Closed
OT-EL-0104-00
KHEP-MS-EL-0064-00 Closed
KHEP-MS-EL-0065-00 Closed
KHEP-MS-EL-0065-01 Closed
KHEP-MA-27-0001-00 Closed
KHEP-MS-LC-0001-00 Closed
KHEP-MS-LC-0002-00 Closed
KHEP-MS-LC-0002-01 Closed
KHEP-MS-LC-0002-02 Closed
KHEP-MS-LC-0003-00 Closed
KHEP-MS-LC-0003-01 Closed
KHEP-MS-LC-0003-02 Closed
KHEP-MS-LC-0003-03 Closed
KHEP-MS-LC-0004-00 Closed
KHEP-MS-LC-0005-00 Closed
KHEP-MS-LC-0005-01 Closed
KHEP-MS-LC-0006 Closed
KHEP-MS-LC-0007 Closed
KHEP-MS-LC-0007-01 Closed
KHEP-MS-LC-0008-00 Closed
KHEP-MS-HVAC-0001-00 Closed
KHEP-MS-HVAC-0002-00 Closed
KHEP-MS-HVAC-0003-00 Closed
KHEP-MS-HVAC-0003-01 Closed
KHEP-MS-HVAC-0003-02 Closed
KHEP-MS-HVAC-0004-00 Closed
KHEP-MS-HVAC-0005-00 Closed
KHEP-MS-HVAC-0006-00 Closed
KHEP-MS-HVAC-0007-00 Closed
KHEP-MS-HVAC-0008-00 Closed
KHEP-MS-HVAC-0008-01 Closed
KHEP-MS-HVAC-0008-02 Closed
KHEP-MS-HVAC-0008-03
REF: KHEP-MS-HVAC-0008- Closed
02
KHEP-MS-HVAC-0009-00 Closed
KHEP-MS-HVAC-0009-01 Closed
KHEP-MS-HVAC-0009-02 Closed
KHEP-MS-HVAC-0010-00 Closed
KHEP-MS-HVAC-0010-01 Closed
KHEP-MS-HVAC-0011-00 Closed
KHEP-MS-HVAC-0011-01
Refer to: KHEP-OT-0099-00 Closed
(calculation)
KHEP-MS-HVAC-0012-00 Closed
KHEP-MS-HVAC-0012-01 Closed
KHEP-MS-HVAC-0013-00 Closed
KHEP-MS-HVAC-0014-00 Closed
KHEP-MS-HVAC-0015-00 Closed
KHEP-MS-HVAC-0016-00 Closed
KHEP-MS-HVAC-0016-01 Closed
KHEP-MS-HVAC-0017-00 Closed
KHEP-MS-HVAC-0018-00
Refer to KHEP-OT-0099-00 Closed
(Calculation)
KHEP-MS-HVAC-0018-00
Refer to KHEP-OT-0099-00 Closed
(Calculation)
KHEP-MS-HVAC-0018-00
Refer to KHEP-OT-0099-00 Closed
(Calculation)
KHEP-MS-HVAC-0019-00 Closed
KHEP-MS-HVAC-0019-01 Closed
KHEP-MS-HVAC-0019-02 Closed
KHEP-MS-HVAC-0020-00 Closed
KHEP-MS-HVAC-0021-00 Closed
KHEP-MS-HVAC-0021-01 Closed
KHEP-MS-ME-0001-00 Closed
KHEP-MS-ME-0001-01 Closed
KHEP-MS-ME-0002-00 Closed
KHEP-MS-ME-0003-00 Closed
KHEP-MS-ME-0003-01 Closed
KHEP-MS-ME-0004-00 Closed
KHEP-MS-ME-0005-00 Closed
KHEP-MS-ME-0006-00 Closed
KHEP-MS-ME-0007-00 Closed
KHEP-MS-ME-0007-01 Closed
KHEP-MS-ME-0008-00 Closed
KHEP-MS-ME-0009-00 Closed
KHEP-MS-ME-0010-00 Closed
KHEP-MS-ME-0011-00 Closed
KHEP-MS-ME-0012-00 Closed
KHEP-MS-ME-0012-01 Open
KHEP-MS-PL-0001-00 Closed
KHEP-MS-PL-0001-01 Closed
KHEP-MS-PL-0001-02 Closed
KHEP-MS-PL-0002-00 Closed
KHEP-MS-PL-0002-01 Closed
KHEP-MS-PL-0003-00 Closed
KHEP-MS-PL-0004-00 Closed
KHEP-MS-PL-0005-00 Closed
KHEP-MS-PL-0005-01 Closed
KHEP-MS-PL-0006-00 Closed
KHEP-MS-PL-0007-00 Closed
KHEP-MS-PL-0007-01 Closed
KHEP-MS-PL-0008-00 Closed
KHEP-MS-PL-0009-00 Closed
KHEP-MS-PL-0010-00 Closed
KHEP-MS-PL-0011-00 Closed
KHEP-MS-PL-0012-00 Closed
KHEP-MS-PL-0012-01 Closed
KHEP-MS-PL-0013-00 Closed
KHEP-MS-PL-0014-00 Closed
KHEP-MS-PL-0015-00 Closed
KHEP-MS-PL-0016-00 Closed
KHEP-MS-PL-0016-01 Closed
KHEP-MS-PL-0016-02 Closed
KHEP-MS-PL-0016-03 Closed
KHEP-MS-PL-0017-00 Closed
KHEP-MS-PL-0017-01 Closed
KHEP-MS-PL-0017-02 Closed
KHEP-MS-PL-0018-00 Closed
KHEP-MS-PL-0019-00 Closed
KHEP-MS-PL-0019-01 Closed
KHEP-MS-PL-0020-00 Closed
KHEP-MS-PL-0020-01 Closed
KHEP-MS-PL-0021-00 Closed
KHEP-MS-PL-0022-00 Closed
KHEP-MS-PL-0023-00 Closed
KHEP-MS-PL-0024-00 Closed
KHEP-MS-PL-0024-01 Closed
KHEP-MS-PL-0025-00 Closed
KHEP-MS-PL-0026-00 Closed
KHEP-MS-PL-0027-00 Closed
KHEP-MS-PL-0028-00 Closed
KHEP-MS-PL-0029-00 Closed
KHEP-MS-PL-0030-00 Closed
KHEP-MS-PL-0031-00 Closed
KHEP-MS-PL-0032-00 Closed
KHEP-MS-PL-0033-00 Closed
KHEP-MS-PL-0034-00 Closed
KHEP-MS-PL-0035-00 Closed
KHEP-MS-PL-0035-01 Closed
KHEP-MS-PL-0036-00 Closed
KHEP-MS-PL-0037-00 Closed
KHEP-MA-03-0001 Closed
KHEP-MS-ST-0001-01 Closed
KHEP-MA-03-0002 Closed
KHEP-MS-ST-0002-01 Closed
KHEP-MA-07-0004 Closed
KHEP-MA-03-0003 Closed
KHEP-MA-03-0004 Closed
KHEP-MA-07-0001 Closed
KHEP-MA-31-0001 Closed
KHEP-MA-03-0005 Closed
KHEP-MS-ST-0006-00 Closed
KHEP-MS-ST-0007-00 Closed
KHEP-MS-ST-0008-00 Closed
KHEP-MS-ST-0009-00 Closed
KHEP-MS-ST-0009-01 Closed
KHEP-MS-ST-0010-00 Closed
KHEP-MS-ST-0011-00 Closed
KHEP-MS-ST-0012-00 Closed
KHEP-MS-ST-0012-01 Closed
KHEP-MS-ST-0013-00 Closed
KHEP-MS-ST-0014-00 Closed
KHEP-MS-ST-0015-00 Closed
KHEP-MS-ST-0016-00 Closed
KHEP-MS-ST-0017-00 Closed
KHEP-MS-ST-0018-00 Closed
KHEP-MS-ST-0019-00 Closed
KHEP-MS-ST-0020-00 Closed
KHEP-MS-ST-0021-00 Closed
KHEP-MS-ST-0022-00 Closed
KHEP-MS-ST-0022-01 Closed
KHEP-MS-ST-0023-00 Closed
KHEP-MS-ST-0024-00 Closed
KHEP-MS-ST-0025-00 Closed
KHEP-MS-ST-0026-00 Closed
KHEP-MS-ST-0027-00 Closed
KHEP-MS-ST-0028-00 Closed
KHEP-MS-ST-0029-00 Closed
KHEP-MS-ST-0030-00 Closed
KHEP-MS-ST-0031-00 Closed
KHEP-MS-ST-0032-00 Closed
KHEP-MS-ST-0032-01 Closed
KHEP-MS-ST-0033-00 Closed
KHEP-MS-ST-0033-01 Closed
Closed
KHEP-MS-ST-0035-00 Closed
KHEP-MS-ST-0036-00 Closed
KHEP-MS-ST-0037-00 Closed
KHEP-MS-ST-0038-00 Closed
KHEP-MS-ST-0039-00 Closed
KHEP-MS-ST-0040-00 Closed
KHEP-MS-ST-0041-00 Closed
SR NO SHOP DRAWING NO. ACTIVITIES / INSPECTION ITEMS SUBMITTED DATE
ARCHITECTURAL
0001 KHEP-SD-AR-0001-00 B2 Ground Floor Plan; First Floor Plan & Roof Plan 28-Mar-2017
0001.1 KHEP-SD-AR-0001-01 B2 Ground Floor Plan, First Floor Plan & Roof Plan 9-May-2017
0001.2 KHEP-SD-AR-0001-02 B2 Ground Floor Plane, First Floor Plan & Roof Plan 1-Jun-2017
0001.3 KHEP-SD-AR-0001-03 B2 Ground Floor Plane, First Floor Plan & Roof Plan 3-Jul-2017
0001.4 KHEP-SD-AR-0001-04 B2 Ground Floor Plane, First Floor Plan & Roof Plan 18-Jul-2017
0001.5 KHEP-SD-AR-0001-05 B2 Ground Floor Plane & First Floor Plan 18-Dec-2017
0001.6 KHEP-SD-AR-0001-06 B2 Ground Floor Plane & First Floor Plan 28-Feb-2018
0002 KHEP-SD-AR-0002-00 B2 Front & Side Elevations; Rear & Side Elevations 28-Mar-2017
0002.1 KHEP-SD-AR-0002-01 B2 Front & Side Elevations; Rear & Side Elevations 9-May-2017
0002.2 KHEP-SD-AR-0002-02 B2 Front & Side Elevations; Rear & Side Elevations 3-Jul-2017
0002.3 KHEP-SD-AR-0002-03 B2 Front & Side Elevations, Rear & Side Elevations 18-Jul-2017
0002.4 KHEP-SD-AR-0002-04 B2 Front & Side Elevations, Rear & Side Elevations 28-Feb-2018
0004 KHEP-SD-AR-0004-00 B2 Kitchen Area Details; Wet Area Details; Stair Details 28-Mar-2017
0004.1 KHEP-SD-AR-0004-01 B2 Kitchen Area Details; Wet Area Details; Stair Details 9-May-2017
0006.2 KHEP-SD-AR-0006-02 B2 Ground Floor & First Floor Reflected Ceiling Plan 1-Aug-2017
0006.3 KHEP-SD-AR-0006-03 B2 Ground Floor & First Floor Reflected Ceiling Plan 4-Jan-2018
0007 KHEP-SD-AR-0007-00 B2 Ground Floor Furniture Layout; First Floor Furniture Layout 28-Mar-2017
0007.1 KHEP-SD-AR-0007-01 B2 Ground Floor Furniture Layout; First Floor Furniture Layout 9-May-2017
0010 KHEP-SD-AR-0010-00 A6 Ground Floor Plan, First Floor Plan & Roof Plan 29-Mar-2017
0010.1 KHEP-SD-AR-0010-01 A6 Ground Floor Plan, First Floor Plan & Roof Plan 14-May-2017
0010.2 KHEP-SD-AR-0010-02 A6 Ground Floor Plan, First Floor Plan & Roof Plan 8-Jul-2017
0010.3 KHEP-SD-AR-0010-03 A6 Ground Floor Plan, First Floor Plan & Roof Plan 18-Jul-2017
0010.4 KHEP-SD-AR-0010-04 A6 Ground Floor Plan & First Floor Plan 18-Dec-2017
0011 KHEP-SD-AR-0011-00 A6 Front & Side Elevations; Rear & Side Elevations 29-Mar-2017
0011.1 KHEP-SD-AR-0011-01 A6 Front & Side Elevations; Rear & Side Elevations 14-May-2017
0011.2 KHEP-SD-AR-0011-02 A6 Front & Rear Elevations & Side Elevations 4-Jul-2017
0011.3 KHEP-SD-AR-0011-03 A6 Front & Rear Elevations & Side Elevations 18-Jul-2017
0015 KHEP-SD-AR-0015-00 A6 Ground Floor Flooring Plan; First Floor Flooring Plan 29-Mar-2017
0015.1 KHEP-SD-AR-0015-01 A6 Ground Floor & First Floor Flooring Plan 14-May-2017
0015.2 KHEP-SD-AR-0015-02 A6 Ground Floor & First Floor Flooring Plan 2-Dec-2017
0016 KHEP-SD-AR-0016-00 A6 Ground Floor Wall Finish Plan, First Floor Finish Plan 29-Mar-2017
0016.1 KHEP-SD-AR-0016-01 A6 Ground Floor Wall Finish Plan, First Floor Finish Plan 14-May-2017
0016.2 KHEP-SD-AR-0016-02 A6 Ground Floor Wall Finish Plan, First Floor Finish Plan 3-Aug-2017
0017.2 KHEP-SD-AR-0017-02 A6 Ground Floor & First Floor Reflected Ceiling Plan 1-Aug-2017
0026 KHEP-SD-AR-0026-00 BC4 GROUND FLOOR & FIRST FLOOR FLOORING PLAN 8-May-2017
0026.1 KHEP-SD-AR-0026-01 BC4 GROUND FLOOR & FIRST FLOOR FLOORING PLAN 27-Dec-2017
0034 KHEP-SD-AR-0034-00 BC6 GROUND FLOOR,FIRST FLOOR & ROOF PLAN 9-May-2017
0034.1 KHEP-SD-AR-0034-01 BC6 GROUND FLOOR,FIRST FLOOR & ROOF PLAN 8-Jul-2017
0034.2 KHEP-SD-AR-0034-02 BC6 GROUND FLOOR, FIRST FLOOR & ROOF PLAN 18-Jul-2017
0039 KHEP-SD-AR-0039-00 BC6 GROUND FLOOR & FIRST FLOOR FLOORING PLAN 9-May-2017
0039.1 KHEP-SD-AR-0039-01 BC6 GROUND FLOOR & FIRST FLOOR FINISHING FLOORING PLAN 31-Jan-2018
0039.2 KHEP-SD-AR-0039-02 BC6 GROUND FLOOR & FIRST FLOOR FINISHING FLOORING PLAN 27-Feb-2018
0046.1 KHEP-SD-AR-0046-01 A4 GROUND FLOOR, FIRST FLOOR & ROOF FLOOR PLAN 1-Jun-2017
0046.2 KHEP-SD-AR-0046-02 A4 GROUND FLOOR, FIRST FLOOR & ROOF FLOOR PLAN 4-Jul-2017
0046.3 KHEP-SD-AR-0046-03 A4 GROUND FLOOR, FIRST FLOOR & ROOF FLOOR PLAN 16-Jul-2017
0052.1 KHEP-SD-AR-0052-01 A4 GROUND FLOOR & FIRST FLOOR WALL FINISHING PLAN 3-Aug-2017
0056.1 KHEP-SD-AR-0056-01 A4 GROUND FLOOR & FIRST FLOOR LIFE SAFETY PLAN 31-Jul-2017
0056.2 KHEP-SD-AR-0056-02 A4 GROUND FLOOR & FIRST FLOOR LIFE SAFETY PLAN 29-Nov-2017
B2 Ground Floor & First Floor Flooring Plan (These drawings showing
the proposal of 600*600mm floor tile layout at dry areas and
0071 KHEP-SD-AR-0071-00 17-Sep-2017
330*330mm floor tile layout for wet areas, for your kind information
& review)
B2 Ground Floor & First Floor Flooring Plan (These drawings showing
the proposal of 450*450mm floor tile layout at dry areas and
0072 KHEP-SD-AR-0072-00 17-Sep-2017
330*330mm floor tile layout for wet areas, for your kind information
& review)
0076 KHEP-SD-AR-0076-00 PTA Ground Floor & Roof Floor Plan 9-Oct-2017
G Fire Related door, Acoustic Door, Flush Wood Door, Hollow Metal
0085 KHEP-SD-AR-0085-00 3-Jan-2018
Door & Metal & Wooden Doors Details
0091 KHEP-SD-AR-0091-00 G Villa B for Disabilities wet area & kitchen area details 27-Jan-2018
0091.1 KHEP-SD-AR-0091-01 G Villa B for Disabilities wet area & kitchen area details 25-Feb-2018
0095 KHEP-SD-AR-0095-00 A6 Roof Floor Plan (Showing Rope Hook Details) 21-Feb-2018
0096 KHEP-SD-AR-0096-00 B2 Roof Floor Plan (Showing Rope Hook Details) 21-Feb-2018
G Staircase & Balsony Railing Details (Typical Details for Cluster Type
0097 KHEP-SD-AR-0097-00 26-Feb-2018
A)
CIVIL
0001 KHEP-SD-32-0001-00 Road 1 2 & 4 Overall Plan 15-Jan-2017
0002 KHEP-SD-01-0002-00 Mobilization grading level and proposed temporary road 19-Jan-2017
0003 KHEP-SD-31-0001-00 Water Pond Coordinate & New Bench Mark Overall Layout Plan 25-Jan-2017
0004 KHEP-SD-01-0003-00 New Bench Mark Layout Plan with Land Surveyor Report 26-Jan-2017
0004.1 KHEP-SD-CI-0003-01 New Bench Mark Layout Plan with Land Surveyor Report 4-Mar-2017
Grading contour Level FFL & excavation level for over all site with
0006 KHEP-SD-CI-0006-00 15-Feb-2017
elevation table
02/22/2017
0007 KHEP-SD-CI-0007-00 Storm Water Drainage Layout (Master Plan)
28-02-2017
0007.1 KHEP-SD-CI-0007-01 Storm Drainage Overall Layout Plan 1 of 12 11-Apr-2017
0008 KHEP-SD-CI-0008-00 Retention Basins Coordinates With Finish Grading Levels Layout Plan 25-02-2017 28-02-2017
0009 KHEP-SD-CI-0009-00 Grading Level, Over All Site Plan 25-02-2017 28-02-2017
0010 KHEP-SD-CI-0010-00 Road Proposed Grading Levels, Over All Site Plan 2-Mar-2017
0010.1 KHEP-SD-CI-0010-01 Road Proposed Grading Levels, Over All Site Plan 23-Mar-2017
0011 KHEP-SD-CI-0011-00 ROAD WORKS-CROSS SECTIONS (SEC-001 TO 35 & SEC-037 TO 64) 08-03-2017 11-03-2017
0013 KHEP-SD-CI-0013-00 Trench, Backfill, Manholes, Cover & Inspection Chamber Details 12-Mar-2017
0014 KHEP-SD-CI-0014-00 Typical Road Cross Sections With Under Ground Utilities 21-Mar-2017
0015 KHEP-SD-CI-0015-00 STORM DRAINAGE NETWORK MANHOLES & PIPE LINE SCHEDULE 15-Apr-2017
0015.1 KHEP-SD-CI-0015-01 STORM DRAINAGE NETWORK MANHOLES & PIPE LINE SCHEDULE 26-Apr-2017
0015.2 KHEP-SD-CI-0015-02 STORM DRAINAGE NETWORK MANHOLES & PIPE LINE SCHEDULE 30-May-2017
0016.1 KHEP-SD-CI-0016-01 POTABLE & FIRE FIGHTING OVER-ALL LAYOUT PLAN 4-Jun-2017
0016.2 KHEP-SD-CI-0016-02 POTABLE & FIRE FIGHTING OVER-ALL LAYOUT PLAN 23-Oct-2017
0030.2 KHEP-SD-CI-0030-02 POTABLE & FIRE FIGHTING NETWORK FIRE HYDRANT DETAILS 9-Aug-2017
0042 KHEP-SD-CI-0042-00 INSPECTION CHAMBER PIPE LINE & BACKDROPS SCHEDULE 5-Oct-2017
0042.1 KHEP-SD-CI-0042-01 INSPECTION CHAMBER PIPE LINE & BACKDROPS SCHEDULE 23-Oct-2017
Public toilet B3 & ancillary building B4 proposed finish grading level &
ground floor finish levels
0052 KHEP-SD-CI-0052-00 17-Jan-2018
Public toilet B1,B2 proposed finish grading level & ground floor finish
levels
Public toilet B3 & ancillary building B4 proposed finish grading level &
ground floor finish levels
0052-01 KHEP-SD-CI-0052-01 29-Jan-2018
Public toilet B1,B2 proposed finish grading level & ground floor finish
levels
Storm DITCH Overall Layout Plan Storm DICH Layout (Part Plan -
0053 KHEP-SD-CI-0053-00 26-Feb-2018
Sheet 01 - 12)
ELECTRICAL
0001 KHEP-SD-EL-0001-00 Ground Floor, First Floor, Roof Floor Fire Alarm System Layout 23-Feb-2017
0001.1 KHEP-SD-EL-0001-01 Ground Floor, First Floor, Roof Floor Fire Alarm System Layout 9-Mar-2017
0001.2 KHEP-SD-EL-0001-02 B2 Ground Floor & First Floor Fire Alarm System Layout 1-Apr-2017
B2 Ground Floor First Floor Fire Alarm System Layout & Fire Alarm
0001.3 KHEP-SD-EL-0001-03 28-Dec-2017
Single Line Diagram
B2 Ground Floor First Floor Fire Alarm single line Diagram, Devices
0001.4 KHEP-SD-EL-0001-04 Tpical Installation, Temination details 1,2 & 3XSFS1B Fire Alarm 4-Feb-2018
Control Panel Components
0002 KHEP-SD-EL-0002-00 B2 Ground Floor, First Floor, Telephone and Data System Layout 23-Feb-2017
0002.1 KHEP-SD-EL-0002-01 B2 Ground Floor, First Floor, Telephone and Data System Layout 3-Apr-2017
0002.2 KHEP-SD-EL-0002-02 B2 Ground Floor, First Floor, Telephone and Data System Layout 15-Oct-2017
0002.3 KHEP-SD-EL-0002-03 B2 Ground & First Floor Telephone and Data System Layout 12-Dec-2017
0002.4 KHEP-SD-EL-0002-04 B2 Ground & First Floor Telephone and Data System Layout 17-Jan-2018
0004 KHEP-SD-EL-0004-00 Med. Voltage Single Line Diagram, Installation, Overall Plan & etc. 20-02-2017 28-02-2017
0004.1 KHEP-SD-EL-0004-01 Med. Voltage Single Line Diagram, Installation, Overall Plan & etc. 23-Mar-2017
0004.2 KHEP-SD-EL-0004-02 Med. Voltage Single Line Diagram, Installation, Overall Plan & etc. 15-Apr-2017
0009 KHEP-SD-EL-0009-00 Cover Page, Drawing Index, Legend and Abbreviation & etc. 19-Mar-2017
A6 Ground Floor First Floor Fire Alarm System Layout & Fire Alarm
0010.2 KHEP-SD-EL-0010-02 28-Dec-2017
Single Line Diagram
A6 Ground Floor First Floor Fire Alarm single line Diagram, Devices
0010.3 KHEP-SD-EL-0010-03 Tpical Installation, Temination details 1,2 & 3XSFS1B Fire Alarm 4-Feb-2018
Control Panel Components
0015.1 KHEP-SD-EL-0015-01 A4 Cluster A4- Ground Floor,FF & RF Power System Layout 18-Apr-2017
0015.3 KHEP-SD-EL-0015-03 CLUSTER A4- GROUND & FIRST FLOOR POWER SYSTEM LAYOUT 12-Dec-2017
0016 KHEP-SD-EL-0016-00 A4 GROUND FLOOR, FF & RF MECHANICAL POWER SYSTEM LAYOUT 2-Apr-2017
0016.1 KHEP-SD-EL-0016-01 A4 GROUND FLOOR, FF & RF MECHANICAL POWER SYSTEM LAYOUT 15-Apr-2017
0017 KHEP-SD-EL-0017-00 A6 PANEL BOARD SCHEDULE FOR VILLA (1,2,3,4,5 & 6) 2-Apr-2017
0018 KHEP-SD-EL-0018-00 A4 GROUND FLOOR & FF FIRE ALARM SYSTEM LAYOUT 2-Apr-2017
A4 Ground Floor First Floor Fire Alarm System Layout & Fire Alarm
0019 KHEP-SD-EL-0018-01 28-Dec-2017
Single Line Diagram
0019.1 KHEP-SD-EL-0019-01 A4 GROUND FLOOR & FF TELEPHONE AND DATA LAYOUT 15-Apr-2017
0019.2 KHEP-SD-EL-0019-02 A4 GROUND & FIRST FLOOR TELEPHONE AND DATA LAYOUT 12-Dec-2017
0019.3 KHEP-SD-EL-0019-03 A4 GROUND & FIRST FLOOR TELEPHONE AND DATA LAYOUT 17-Jan-2018
0020 KHEP-SD-EL-0020-00 MV CABLE ROUTING PART 1 OF 12 9-Apr-2017
0029 KHEP-SD-EL-0029-00 B4 GROUND FLOOR,FF & RF MECHANICAL POWER SYSTEM LAYOUT 17-Apr-2017
0029.1 KHEP-SD-EL-0029-01 B4 GROUND FLOOR,FF & RF MECHANICAL POWER SYSTEM LAYOUT 8-May-2017
0029.2 KHEP-SD-EL-0029-02 B4 GROUND FLOOR,FF & RF MECHANICAL POWER SYSTEM LAYOUT 31-May-2017
0030 KHEP-SD-EL-0030-00 B4 GROUND FLOOR & FF TELEPHONE AND DATA SYSTEM LAYOUT 17-Apr-2017
0031 KHEP-SD-EL-0031-00 B4 GROUND FLOOR & FF FIRE ALARM SYSTEM LAYOUT 17-Apr-2017
B4 Ground Floor First Floor Fire Alarm System Layout & Fire Alarm
0031.1 KHEP-SD-EL-0031-01 28-Dec-2017
Single Line Diagram
0044 KHEP-SD-EL-0044-00 ANCILLIARY BUILDING - GROUND FLOOR POWER SYSTEM LAYOUT 9-Jul-2017
0050 KHEP-SD-EL-0050-00 PUBLIC TOILET A- GROUND FLOOR POWER SYSTEM LAYOUT 19-Jul-2017
0051 KHEP-SD-EL-0051-00 PUBLIC TOILET A- GROUND FLOOR LIGHTING SYSTEM LAYOUT 19-Jul-2017
0052 KHEP-SD-EL-0052-00 PUBLIC TOILET A- GROUND FLOOR EARTHING SYSTEM LAYOUT 19-Jul-2017
0052.1 KHEP-SD-EL-0052-01 PUBLIC TOILET A- GROUND FLOOR EARTHING SYSTEM LAYOUT 1-Aug-2017
0054 KHEP-SD-EL-0054-00 PUBLIC TOILET- GROUND FLOOR POWER SYSTEM LAYOUT 19-Jul-2017
0055 KHEP-SD-EL-0055-00 PUBLIC TOILET- GROUND FLOOR LIGHTING SYSTEM LAYOUT 19-Jul-2017
0071 KHEP-SD-EL-0071-00 CLUSTER B4- GROUND & FIRST FLOOR POWER SYSTEM LAYOUT 5-Dec-2017
Cluster A4 Ground Floor, First Floor & Roof Floor Lighting System
0078 KHEP-SD-EL-0078-00 18-Dec-2017
layout
Cluster A4 Ground Floor, First Floor & Roof Floor Mechanical Power
0079 KHEP-SD-EL-0079-00 18-Dec-2017
System Layout
Cluster A4 Ground Floor, First Floor & Roof Floor Mechanical Power
0079.1 KHEP-SD-EL-0079-01 16-Jan-2018
System Layout
Cluster A4 Ground Floor, First Floor & Roof Floor Mechanical Power
0079.2 KHEP-SD-EL-0079-02 7-Feb-2018
System Layout
B6 Ground Floor First Floor Fire Alarm System Layout & Fire Alarm
0080 KHEP-SD-EL-0080-00 28-Dec-2017
Single Line Diagram
Cluster A6 Ground Floor, First Floor & Roof Floor Mechanical Power
0081 KHEP-SD-EL-0081-00 11-Jan-2018
System Layout
Cluster A6 Ground Floor, First Floor & Roof Floor Mechanical Power
0081.1 KHEP-SD-EL-0081-01 6-Feb-2018
System Layout
Cluster B2 Ground Floor, First Floor & Roof Floor Mechanical Power
0082 KHEP-SD-EL-0082-00 11-Jan-2018
System Layout
Cluster B2 Ground Floor, First Floor & Roof Floor Mechanical Power
0082.1 KHEP-SD-EL-0082-01 31-Jan-2018
System Layout
Cluster B2 Ground Floor, First Floor & Roof Floor Mechanical Power
0082.2 KHEP-SD-EL-0082-02 19-Feb-2018
System Layout
0003.2 KHEP-SD-LC-0003-02 Telecom Network Plan & Telecom Network Partial Plan- 1 to 12 21-Dec-2017
0006 KHEP-SD-LC-0006-00
HVAC
0001 KHEP-SD-HVAC-0001-00 B2 First Floor, Ground Floor, Roof Floor Ducting & Piping Layout 23-Feb-2017
0001.1 KHEP-SD-HVAC-0001-01 B2 First Floor, Ground Floor, Roof Floor Ducting Layout 23-Feb-2017
0001.2 KHEP-SD-HVAC-0001-02 B2 First Floor, Ground Floor, Roof Floor Ducting Layout 5-Jul-2017
0001.3 KHEP-SD-HVAC-0001-03 B2 First Floor, Ground Floor, Roof Floor Ducting Layout 15-Jul-2017
0001.4 KHEP-SD-HVAC-0001-04 B2 First Floor, Ground Floor, Roof Floor Ducting Layout 7-Aug-2017
0003 KHEP-SD-HVAC-0003-00 A6 Villa type Ground Floor,FF & RF HVAC Piping. 24-Apr-2017
0003.1 KHEP-SD-HVAC-0003-01 A6 Villa type Ground Floor,FF & RF HVAC Piping. 10-Jun-2017
0004.1 KHEP-SD-HVAC-0004-01 BC4 Ground Floor, First Floor & Roof Floor Duct Work 30-May-2017
0004.2 KHEP-SD-HVAC-0004-02 BC4 Ground Floor, First Floor & Roof Floor Duct Work 5-Jul-2017
0004.3 KHEP-SD-HVAC-0004-03 BC4 Ground Floor, First Floor & Roof Floor Duct Work 15-Jul-2017
0004.4 KHEP-SD-HVAC-0004-04 BC4 Ground Floor, First Floor & Roof Floor Duct Work 7-Aug-2017
BC4 Villa type Ground Floor HVAC Piping.
0005 KHEP-SD-HVAC-0005-00 BC4 Villa type First Floor HVAC Piping. 25-Apr-2017
BC4 Villa type Roof Floor HVAC Piping.
BC4 Ground Floor HVAC Piping work
0005.1 KHEP-SD-HVAC-0005-01 BC4 First Floor HVAC Piping work 11-Jun-2017
BC4 Roof Floor HVAC Piping work
BC6 VILLA TYPE GROUND FLOOR DUCTING LAY OUT
0006 KHEP-SD-HVAC-0006-00 BC6 VILLA TYPE FIRST FLOOR DUCTING LAY OUT 1-May-2017
BC6 VILLA TYPE ROOF FLOOR DUCTING LAY OUT
0006.1 KHEP-SD-HVAC-0006-01 BC6 Ground Floor, First Floor & Roof Floor Duct Work 30-May-2017
0006.2 KHEP-SD-HVAC-0006-02 BC6 Ground Floor, First Floor & Roof Floor Duct Work 5-Jul-2017
0006.3 KHEP-SD-HVAC-0006-03 BC6 Ground Floor, First Floor & Roof Floor Duct Work 15-Jul-2017
0006.4 KHEP-SD-HVAC-0006-04 BC6 Ground Floor, First Floor & Roof Floor Duct Work 7-Aug-2017
0009.1 KHEP-SD-HVAC-0009-01 A4 Ground Floor, First Floor & Roof Floor Duct Work 31-May-2017
0009.2 KHEP-SD-HVAC-0009-02 A4 Ground Floor, First Floor & Roof Floor Duct Work 5-Jul-2017
0009.3 KHEP-SD-HVAC-0009-03 A4 Ground Floor, First Floor & Roof Floor Duct Work 15-Jul-2017
0009.4 KHEP-SD-HVAC-0009-04 A4 Ground Floor, First Floor & Roof Floor Duct Work 7-Aug-2017
0022 KHEP-SD-HVAC-0022-00 HVAC Standard Details General for All Cluster 4-Dec-2017
0022.1 KHEP-SD-HVAC-0022-01 HVAC Standard Details General for All Cluster 3-Jan-2018
MECHANICAL
0001 KHEP-SD-ME-0001-00 B2 First Floor - Fire Protection Layout, Ground Floor - Fire protection 22-Feb-2017
0001.1 KHEP-SD-ME-0001-01 B2 First Floor - Fire Protection, Ground Floor - Fire protection 20-May-2017
0001.2 KHEP-SD-ME-0001-02 B2 First Floor - Fire Protection, Ground Floor - Fire protection 5-Aug-2017
B2 First Floor & Ground Floor Fire protection Layout & B2 Schematic
0001.3 KHEP-SD-ME-0001-03 23-Dec-2017
Riser Diagram For Fire Protection
0001.4 KHEP-SD-ME-0001-04 B2 First Floor & Ground Floor Fire protection Layout 3-Jan-2018
0004 KHEP-SD-ME-0004-00 BC4 Ground Floor & First Floor Fire Protection Layout. 24-Apr-2017
0004.1 KHEP-SD-ME-0004-01 BC4 Ground Floor & First Floor Fire Protection Layout. 6-Aug-2017
BC4 Ground Floor & First Floor Fire Protection Layout & Riser
0004.2 KHEP-SD-ME-0004-02 13-Jan-2018
Diagram
0005 KHEP-SD-ME-0005-00 BC6 Ground Floor & First Floor Fire Protection Layout. 1-May-2017
0005.1 KHEP-SD-ME-0005-01 BC6 Ground Floor & First Floor Fire Protection Layout. 6-Aug-2017
BC6 Ground Floor & First Floor Fire Protection Layout & Riser
0005.2 KHEP-SD-ME-0005-02 13-Jan-2018
Diagram
0006 KHEP-SD-ME-0006-00 A4 Ground Floor & First Floor Fire Protection Layout. 7-May-2017
0006.1 KHEP-SD-ME-0006-01 A4 Ground Floor & First Floor Fire Protection Layout. 6-Aug-2017
0006.2 KHEP-SD-ME-0006-02 A4 Ground Floor & First Floor Fire Protection Layout. 23-Jan-2018
0009 KHEP-SD-ME-0009-00 A6 First Floor & Roof Floor - Builders work 16-May-2017
0010 KHEP-SD-ME-0010-00 A4 Villa Type Ground Floor, First Floor & Roof Floor - Builders work 16-May-2017
0011 KHEP-SD-ME-0011-00 BC6 Villa Type Ground Floor, First Floor & Roof Floor - Builders work 17-May-2017
0011.1 KHEP-SD-ME-0011-01 BC6 Villa Type Ground Floor, First Floor & Roof Floor - Builders work 23-Jan-2018
0012 KHEP-SD-ME-0012-00 BC4 Villa Type Ground Floor, First Floor & Roof Floor - Builders work 17-May-2017
0012.1 KHEP-SD-ME-0012-01 BC4 Villa Type Ground Floor, First Floor & Roof Floor - Builders work 23-Jan-2018
0013 KHEP-SD-ME-0013-00 B2 Villa Type, Schematic riser Diagram, Fire Protection 18-May-2017
0013.1 KHEP-SD-ME-0013-01 B2 Villa Type, Schematic riser Diagram, Fire Protection 6-Aug-2017
0014 KHEP-SD-ME-0014-00 BC4 Villa Type, Schematic riser Diagram, Fire Protection 18-May-2017
0014.1 KHEP-SD-ME-0014-01 BC4 Villa Type, Schematic riser Diagram, Fire Protection 6-Aug-2017
0015 KHEP-SD-ME-0015-00 BC6 Villa Type, Schematic riser Diagram, Fire Protection 18-May-2017
0015.1 KHEP-SD-ME-0015-01 BC6 Villa Type, Schematic riser Diagram, Fire Protection 6-Aug-2017
0016 KHEP-SD-ME-0016-00 A4 Villa Type, Schematic riser Diagram, Fire Protection 18-May-2017
0016.1 KHEP-SD-ME-0016-01 A4 Villa Type, Schematic riser Diagram, Fire Protection 6-Aug-2017
0017 KHEP-SD-ME-0017-00 A6 Villa Type, Schematic riser Diagram, Fire Protection 18-May-2017
0017.1 KHEP-SD-ME-0017-01 A6 Villa Type, Schematic riser Diagram, Fire Protection 6-Aug-2017
PLUMBING
0001 KHEP-SD-PL-0001-00 B2 Ground Floor, First Floor,Roof Floor - Drainage Layout 22-Feb-2017
0001.1 KHEP-SD-PL-0001-01 B2 Ground Floor, First Floor, Roof Floor - Drainage System 30-May-2017
0002 KHEP-SD-PL-0002-00 B2 1st Floor ,Ground Floor, Roof Floor - Water Supply Layout 22-Feb-2017
0002.1 KHEP-SD-PL-0002-01 B2 Ground Floor, First Floor, Roof Floor-Water Supply Layout 12-Mar-2017
0004 KHEP-SD-PL-0004-00 A6 Ground Floor, First Floor, Roof Floor-Water Supply Layout 17-Apr-2017
0004.1 KHEP-SD-PL-0004-01 A6 Ground Floor, First Floor, Roof Floor-Water Supply Layout 23-May-2017
0005 KHEP-SD-PL-0005-00 BC4 Villa type Ground Floor,FF & RF Water Supply Piping 24-Apr-2017
0005.1 KHEP-SD-PL-0005-01 BC4 Ground Floor, First Floor & Roof Floor Water Supply 30-May-2017
0005.2 KHEP-SD-PL-0005-02 BC4 Ground Floor, First Floor & Roof Floor Water Supply 6-Jun-2017
0006 KHEP-SD-PL-0006-00 BC4 Villa type Ground Floor,FF & RF Drainage Piping 24-Apr-2017
0006.1 KHEP-SD-PL-0006-01 BC4 Type Ground Floor,FF & RF Drainage Layout 13-May-2017
BC6 VILLA TYPE GROUND FLOOR, FIRST FLOOR & ROOF FLOOR
0007.1 KHEP-SD-PL-0007-01 31-May-2017
DRAINAGE SYSTEM
BC6 VILLA TYPE GROUND FLOOR, FIRST FLOOR & ROOF FLOOR
0008 KHEP-SD-PL-0008-01 31-May-2017
WATER SYSTEM
0011.1 KHEP-SD-PL-0011-01 A4 Ground Floor , First Floor & Roof Floor Water Supply Layout 20-May-2017
STRUCTURAL
0001 KHEP-SD-ST-0001-00 B2 Foundation GA Plan, Section & Details 15-Feb-2017
0002 KHEP-SD-ST-0002-00 B2 SLAB on Grade GA Plan, Section & Details, etc. 19-Feb-2017
0002.1 KHEP-SD-ST-0002-01 B2 SLAB on Grade GA Plan, Section & Details, etc. 22-Mar-2017
A6 Ground Floor Beams Reinforcement, Sec. & Det. (Part 1, 2 & All
0003 KHEP-SD-ST-0003-00 19-Feb-2017
BBS )
A6 Ground Floor Beams Reinforcement, Sec. & Det. (Part 1, 2 & All
0003.1 KHEP-SD-ST-0003-01 22-Mar-2017
BBS )
B2 Ground Floor Beams Reinforcement, Sec. & Det. (Part 1, 2 & All
0004 KHEP-SD-ST-0004-00 26-Mar-2017
BBS )
B2 Ground Floor Beams Reinforcement, Sec. & Det. (Part 1, 2 & All
0004.1 KHEP-SD-ST-0004-01 2-Apr-2017
BBS )
0008 KHEP-SD-ST-0008-00 A6 Concrete Wall General Arrangement Plan & Elevation 14-Mar-2017
0008.1 KHEP-SD-ST-0008-01 A6 Concrete Wall General Arrangement Plan & Elevation 13-Apr-2017
0008.2 KHEP-SD-ST-0008-02 A6 Concrete Wall General Arrangement Plan & Elevation 7-Jun-2017
0009 KHEP-SD-ST-0009-00 B2 Concrete Wall General Arrangement Plan & Elevation 14-Mar-2017
009.1 KHEP-SD-ST-0009-01 B2 Concrete Wall General Arrangement Plan & Elevation 8-Apr-2017
009.2 KHEP-SD-ST-0009-02 B2 Concrete Wall General Arrangement Plan & Elevation 12-Jun-2017
009.3 KHEP-SD-ST-0009-03 B2 Concrete Wall General Arrangement Plan & Elevation 23-Oct-2017
009.4 KHEP-SD-ST-0009-04 B2 Concrete Wall General Arrangement Plan & Elevation 8-Nov-2017
0010 KHEP-SD-ST-0010-00 A6 First Floor Beam Reinforcement Section and Details 21-Mar-2017
0010.1 KHEP-SD-ST-0010-01 A6 First Floor Beam Reinforcement Section and Details BBS 17-May-2017
0010.2 KHEP-SD-ST-0010-02 A6 First Floor Beam Reinforcement Section and Details BBS 4-Jun-2017
0012 KHEP-SD-ST-0012-00 B2 First Floor Beam Reinforcement Section and Details 22-Mar-2017
0013 KHEP-SD-ST-0013-00 BC4 Foundation GA Plan Sections & Details BBS 01-Apr-2017
0013.1 KHEP-SD-ST-0013-01 BC4 Foundation GA Plan Sections & Details BBS 18-Apr-2017
0013.2 KHEP-SD-ST-0013-02 BC4 Foundation GA Plan Sections & Details BBS 24-Apr-2017
0014 KHEP-SD-ST-0014-00 BC6 Foundation GA Plan Sections & Details BBS 6-Apr-2017
0014 KHEP-SD-ST-0014-01 BC6 Foundation GA Plan Sections & Details BBS 19-Apr-2017
A4 FOUNDATION GA PLAN
A4 FOUNDATION GA SECTIONS & DETAILS
0015.2 KHEP-SD-ST-0015-02 A4 FOUNDATION REINFORCEMENT PLAN 10-May-2017
A4 FOUNDATION REINFORCEMENT SECTIONS & DETAILS
A4 BBS (FOOTINGS, COLUMNS & WALLS STARTER BARS)
0018.3 KHEP-SD-ST-0018-03 BC4 CONCRETE WALL REINFORCEMENT PLAN AND ELEVATION 25-Oct-2017
0019.2 KHEP-SD-ST-0019-02 BC6 CONCRETE WALL REINFORCEMENT PLAN AND ELEVATION 25-Oct-2017
0051 KHEP-SD-ST-0051-00 BC6 FIRST FLOOR SLAB GA PLAN, SECTION & DETAILS 26-Jul-2017
0051.1 KHEP-SD-ST-0051-01 BC6 FIRST FLOOR SLAB GA PLAN, SECTION & DETAILS 18-Oct-2017
OTHER
0001 KHEP-SD-G-0001-00 A4 Ground Floor & First Floor Coordination Layout 19-Jul-2017
0001.1 KHEP-SD-G-0001-01 A4 Ground Floor & First Floor Coordination Layout 9-Aug-2017
0002 KHEP-SD-G-0002-00 A6 Ground Floor & First Floor Coordination Layout 19-Jul-2017
0002.1 KHEP-SD-G-0002-01 A6 Ground Floor & First Floor Coordination Layout 9-Aug-2017
0003 KHEP-SD-G-0003-00 B2 Ground Floor & First Floor Coordination Layout 19-Jul-2017
0003.1 KHEP-SD-G-0003-01 B2 Ground Floor & First Floor Coordination Layout 9-Aug-2017
0004 KHEP-SD-G-0004-00 BC4 Ground Floor & First Floor Coordination Layout 19-Jul-2017
0004.1 KHEP-SD-G-0004-01 BC4 Ground Floor & First Floor Coordination Layout 9-Aug-2017
0005 KHEP-SD-G-0005-00 BC6 Ground Floor & First Floor Coordination Layout 19-Jul-2017
0005.1 KHEP-SD-G-0005-01 BC6 Ground Floor & First Floor Coordination Layout 9-Aug-2017
A Approved
B Approved w/ Comments
E Rejected
SUBMITTED FOR RESPONDED AS
DISCIPLINE DATE RESPONDED INTERNAL REFERRENCE NO
CODE STATUS CODE STATUS
KHEP-SD-AR-B2-PL-GF-001
Revise &
Architectural 1 Approval 6-Apr-2017 C Resubmit
KHEP-SD-AR-B2-PL-FF-002
KHEP-SD-AR-B2-PL-RF-003
KHEP-SD-AR-B2-PL-GF-001
Revise &
Architectural 1 Approval 23-May-2017 C Resubmit
KHEP-SD-AR-B2-PL-FF-002
KHEP-SD-AR-B2-PL-RF-003
KHEP-SD-AR-B2-PL-GF-001
Revise &
Architectural 1 Approval 11-Jun-2017 C Resubmit
KHEP-SD-AR-B2-PL-FF-002
KHEP-SD-AR-B2-PL-RF-003
KHEP-SD-AR-B2-PL-GF-001
Revise &
Architectural 1 Approval 12-Jul-2017 C Resubmit
KHEP-SD-AR-B2-PL-FF-002
KHEP-SD-AR-B2-PL-RF-003
Approved KHEP-SD-AR-B2-PL-GF-001
Architectural 1 Approval 26-Jul-2017 B w/ KHEP-SD-AR-B2-PL-FF-002
Comments KHEP-SD-AR-B2-PL-RF-003
KHEP-SD-AR-B2-PL-GF-001
Revise &
Architectural 1 Approval 2-Dec-2017 C Resubmit
KHEP-SD-AR-B2-PL-FF-002
KHEP-SD-AR-B2-PL-RF-003
KHEP-SD-AR-B2-PL-GF-001
Architectural 1 Approval KHEP-SD-AR-B2-PL-FF-002
KHEP-SD-AR-B2-DET-GF-008
Revise & KHEP-SD-AR-B2-DET-FF-009
Architectural 1 Approval 6-Apr-2017 C Resubmit KHEP-SD-AR-B2-DET-FF-010
KHEP-SD-AR-B2-DET-011
KHEP-SD-AR-B2-DET-GF-008
Revise & KHEP-SD-AR-B2-DET-FF-009
Architectural 1 Approval 30-May-2017 C Resubmit KHEP-SD-AR-B2-DET-FF-010
KHEP-SD-AR-B2-DET-011
Revise &
Architectural 1 Approval 20-Sep-2017 C Resubmit
KHEP-SD-AR-B2-DET-GF-008
Revise &
Architectural 1 Approval 30-May-2017 C Resubmit
KHEP-SD-AR-A6-DET-008
Revise &
Architectural 1 Approval 20-Sep-2017 C Resubmit
KHEP-SD-AR-A6-DET-008
Revise &
Architectural 1 Approval 12-Nov-2017 C Resubmit
KHEP-SD-AR-A6-DET-008
Revise &
Architectural 1 Approval 8-Apr-2017 C Resubmit
KHEP-SD-AR-A6-KD-009
Approved
Architectural 1 Approval 30-May-2017 B w/ KHEP-SD-AR-A6-KD-009
Comments
Revise & KHEP-SD-AR-A6-FFP-GF-010
Architectural 1 Approval 8-Apr-2017 C Resubmit KHEP-SD-AR-A6-FFP-FF-011
Revise & KHEP-SD-AR-A6-FFP-GF-010
Architectural 1 Approval 30-May-2017 C Resubmit KHEP-SD-AR-A6-FFP-FF-011
Approved
KHEP-SD-AR-A6-FFP-GF-010
Architectural 1 Approval 20-Dec-2017 B w/
KHEP-SD-AR-A6-FFP-FF-011
Comments
Revise & KHEP-SD-AR-A6-WF-GF-012
Architectural 1 Approval 8-Apr-2017 C Resubmit KHEP-SD-AR-A6-WF-FF-013
Revise & KHEP-SD-AR-A6-WF-GF-012
Architectural 1 Approval 30-May-2017 C Resubmit KHEP-SD-AR-A6-WF-FF-013
Approved
KHEP-SD-AR-A6-WF-GF-012
Architectural 1 Approval 20-Sep-2017 B w/
KHEP-SD-AR-A6-WF-FF-013
Comments
Revise & KHEP-SD-AR-A6-RCP-GF-014
Architectural 1 Approval 8-Apr-2017 C Resubmit KHEP-SD-AR-A6-RCP-FF-015
Revise & KHEP-SD-AR-A6-RCP-GF-014
Architectural 1 Approval 30-May-2017 C Resubmit KHEP-SD-AR-A6-RCP-FF-015
Revise & KHEP-SD-AR-A6-RCP-GF-014
Architectural 1 Approval 28-Aug-2017 C Resubmit KHEP-SD-AR-A6-RCP-FF-015
KHEP-SD-AR-A6-WAD-GF-016
Revise &
Architectural 1 Approval 8-Apr-2017 C Resubmit
KHEP-SD-AR-A6-WAD-FF-017
KHEP-SD-AR-A6-WAD-FF-018
KHEP-SD-AR-A6-WAD-GF-016
Revise &
Architectural 1 Approval 1-Jun-2017 C Resubmit
KHEP-SD-AR-A6-WAD-FF-017
KHEP-SD-AR-A6-WAD-FF-018
KHEP-SD-AR-A6-WAD-GF-016 (1-3)
KHEP-SD-AR-A6-WAD-GF-016 (2-3)
Approved KHEP-SD-AR-A6-WAD-GF-016 (3-3)
Architectural 1 Approval 20-Dec-2017 B w/ KHEP-SD-AR-A6-WAD-FF-017
Comments KHEP-SD-AR-A6-WAD-FF-018 (1-2)
KHEP-SD-AR-A6-WAD-FF-018 (2-2)
KHEP-SD-AR-BC4-PL-GF-001
Revise & KHEP-SD-AR-BC4-PL-FF-002
Architectural 1 Approval 11-Jun-2017 C Resubmit KHEP-SD-AR-BC4-PL-RF-003
KHEP-SD-AR-BC4-PL-GF-001
Revise & KHEP-SD-AR-BC4-PL-FF-002
Architectural 1 Approval 16-Jul-2017 C Resubmit KHEP-SD-AR-BC4-PL-RF-003
KHEP-SD-AR-BC4-PL-GF-001
Approved
KHEP-SD-AR-BC4-PL-FF-002
Architectural 1 Approval 26-Jul-2017 B w/
KHEP-SD-AR-BC4-PL-RF-003
Comments
KHEP-SD-AR-BC4-ELEV-004
Revise &
Architectural 1 Approval 4-Jun-2017 C Resubmit
KHEP-SD-AR-BC4-ELEV-005
KHEP-SD-AR-BC4-ELEV-004
Revise &
Architectural 1 Approval 12-Jul-2017 C Resubmit
KHEP-SD-AR-BC4-ELEV-005
Approved KHEP-SD-AR-BC4-ELEV-004
Architectural 1 Approval 26-Jul-2017 B w/ KHEP-SD-AR-BC4-ELEV-005
Comments
KHEP-SD-AR-BC4-SEC-006
Revise &
Architectural 1 Approval 22-May-2017 C Resubmit
KHEP-SD- AR-BC4-SEC-007
KHEP-SD-AR-BC4-SEC-006
Revise &
Architectural 1 Approval 29-Jul-2017 C Resubmit
KHEP-SD- AR-BC4-SEC-007
KHEP-SD-AR-BC4-SEC-006
Revise &
Architectural 1 Approval 29-Aug-2017 C Resubmit
KHEP-SD- AR-BC4-SEC-007
Revise &
Architectural 1 Approval 28-May-2017 C Resubmit
KHEP-SD-AR-BC4-DET-GF-008
Revise &
Architectural 1 Approval 20-Sep-2017 C Resubmit
KHEP-SD-AR-BC4-DET-GF-008
KHEP-SD-AR-BC4-WAD-016
Revise &
Architectural 1 Approval 28-May-2017 C Resubmit
KHEP-SD-AR-BC4-WAD-017
KHEP-SD-AR-BC4-WAD-018
KHEP-SD-AR-BC4-WAD-016(1/2)
Revise & KHEP-SD-AR-BC4-WAD-016(2/2)
Architectural 1 Approval 1-Feb-2018 C Resubmit KHEP-SD-AR-BC4-WAD-017
KHEP-SD-AR-BC4-WAD-018
KHEP-SD-AR-BC4-FUR-GF-019
Architectural 1 Approval 28-May-2017 A Approved KHEP-SD-AR-BC4-FUR-FF-020
KHEP-SD-AR-BC4-SP-GF-021
Architectural 1 Approval 22-May-2017 E Rejected KHEP-SD-AR-BC4-SP-FF-022
KHEP-SD-AR-BC4-SP-GF-021
Revise &
Architectural 1 Approval 8-Aug-2017 C Resubmit
KHEP-SD-AR-BC4-SP-FF-022
KHEP-SD-AR-BC4-SP-GF-021
Architectural 1 Approval 5-Dec-2017 A Approved KHEP-SD-AR-BC4-SP-FF-022
KHEP-SD-AR-BC4-DS-023
Revise &
Architectural 1 Approval 22-May-2017 C Resubmit
KHEP-SD-AR-BC4-WS-024
KHEP-SD-AR-B2-DS-022
Revise &
Architectural 1 Approval 30-May-2017 C Resubmit
KHEP-SD-AR-B2-WS-023
KHEP-SD-AR-BC6-PL-GF-001
Revise & KHEP-SD-AR-BC6-PL-FF-002
Architectural 1 Approval 23-May-2017 C Resubmit KHEP-SD-AR-BC6-PL-RF-003
KHEP-SD-AR-BC6-PL-GF-001
Revise & KHEP-SD-AR-BC6-PL-FF-002
Architectural 1 Approval 16-Jul-2017 C Resubmit KHEP-SD-AR-BC6-PL-RF-003
KHEP-SD-AR-BC6-PL-GF-001
Approved
KHEP-SD-AR-BC6-PL-FF-002
Architectural 1 Approval 26-Jul-2017 B w/
KHEP-SD-AR-BC6-PL-RF-003
Comments
KHEP-SD-AR-BC6-ELEV-004
Revise &
Architectural 1 Approval 28-May-2017 C Resubmit
KHEP-SD-AR-BC6-ELEV-005
KHEP-SD-AR-BC6-ELEV-004
Revise &
Architectural 1 Approval 12-Jul-2017 C Resubmit
KHEP-SD-AR-BC6-ELEV-005
Approved KHEP-SD-AR-BC6-ELEV-004
Architectural 1 Approval 26-Jul-2017 B w/ KHEP-SD-AR-BC6-ELEV-005
Comments
KHEP-SD-AR-BC6-SEC-006
Revise &
Architectural 1 Approval 30-May-2017 C Resubmit
KHEP-SD- AR-BC6-SEC-007
KHEP-SD-AR-BC6-SEC-006
Revise &
Architectural 1 Approval 29-Jul-2017 C Resubmit
KHEP-SD- AR-BC6-SEC-007
KHEP-SD-AR-BC6-SEC-006
Revise &
Architectural 1 Approval 29-Aug-2017 C Resubmit
KHEP-SD- AR-BC6-SEC-007
Revise &
Architectural 1 Approval 30-May-2017 C Resubmit
KHEP-SD-AR-BC6-DET-GF-008
Revise &
Architectural 1 Approval 20-Sep-2017 C Resubmit
KHEP-SD-AR-BC6-DET-GF-008
Revise &
Architectural 1 Approval 30-May-2017 C Resubmit
KHEP-SD-AR-BC6-KD-GF-009
Revise &
Architectural 1 Approval 20-Sep-2017 C Resubmit
KHEP-SD-AR-BC6-KD-GF-009
Approved KHEP-SD-AR-BC6-WF-GF-012
Architectural 1 Approval 20-Sep-2017 B w/ KHEP-SD-AR-BC6-WF-FF-013
Comments
KHEP-SD-AR-BC6-RCP-GF-014
Revise &
Architectural 1 Approval 30-May-2017 C Resubmit
KHEP-SD-AR-BC6-RCP-FF-015
KHEP-SD-AR-BC6-RCP-GF-014
Revise &
Architectural 1 Approval 28-Aug-2017 C Resubmit
KHEP-SD-AR-BC6-RCP-FF-015
KHEP-SD-AR-BC6-WAD-016
Revise & KHEP-SD-AR-BC6-WAD-017
Architectural 1 Approval 30-May-2017 C Resubmit KHEP-SD-AR-BC6-WAD-018
KHEP-SD-AR-BC6-WAD-016(1/2)
Revise & KHEP-SD-AR-BC6-WAD-016(2/2)
Architectural 1 Approval 1-Feb-2018 C Resubmit KHEP-SD-AR-BC6-WAD-017
KHEP-SD-AR-BC6-WAD-018
Approved
KHEP-SD-AR-BC6-FUR-GF-019
Architectural 1 Approval 30-May-2017 B w/
KHEP-SD-AR-BC6-FUR-FF-020
Comments
KHEP-SD-AR-BC6-SP-GF-021
Architectural 1 Approval 22-May-2017 E Rejected
KHEP-SD-AR-BC6-SP-FF-022
Revise & KHEP-SD-AR-BC6-SP-GF-021
Architectural 1 Approval 8-Aug-2017 C Resubmit KHEP-SD-AR-BC6-SP-FF-022
KHEP-SD-AR-BC6-SP-GF-021
Architectural 1 Approval 5-Dec-2017 A Approved
KHEP-SD-AR-BC6-SP-FF-022
Revise & KHEP-SD-AR-BC6-DS-023
Architectural 1 Approval 1-Jun-2017 C Resubmit KHEP-SD-AR-BC6-WS-024
KHEP-SD-AR-A4-PL-GF-001
Revise &
Architectural 1 Approval 28-May-2017 C Resubmit
KHEP-SD-AR-A4-PL-FF-002
KHEP-SD-AR-A4-PL-RF-003
KHEP-SD-AR-A4-PL-GF-001
Revise &
Architectural 1 Approval 11-Jun-2017 C Resubmit
KHEP-SD-AR-A4-PL-FF-002
KHEP-SD-AR-A4-PL-RF-003
KHEP-SD-AR-A4-PL-GF-001
Revise &
Architectural 1 Approval 12-Jul-2017 C Resubmit
KHEP-SD-AR-A4-PL-FF-002
KHEP-SD-AR-A4-PL-RF-003
Approved KHEP-SD-AR-A4-PL-GF-001
Architectural 1 Approval 20-Jul-2017 B w/ KHEP-SD-AR-A4-PL-FF-002
Comments KHEP-SD-AR-A4-PL-RF-003
Revise & KHEP-SD-AR-A4-ELEV-004
Architectural 1 Approval 30-May-2017 C Resubmit KHEP-SD-AR-A4-ELEV-005
Revise & KHEP-SD-AR-A4-ELEV-004
Architectural 1 Approval 12-Jul-2017 C Resubmit KHEP-SD-AR-A4-ELEV-005
Approved
KHEP-SD-AR-A4-ELEV-004
Architectural 1 Approval 20-Jul-2017 B w/
KHEP-SD-AR-A4-ELEV-005
Comments
Revise & KHEP-SD-AR-A4-SEC-006
Architectural 1 Approval 30-May-2017 C Resubmit KHEP-SD- AR-A4-SEC-007
Revise & KHEP-SD-AR-A4-SEC-006
Architectural 1 Approval 29-Jul-2017 C Resubmit KHEP-SD- AR-A4-SEC-007
Revise & KHEP-SD-AR-A4-SEC-006
Architectural 1 Approval 29-Aug-2017 C Resubmit KHEP-SD- AR-A4-SEC-007
Revise &
Architectural 1 Approval 30-May-2017 C Resubmit
KHEP-SD-AR-A4-DET-GF-008
Revise &
Architectural 1 Approval 20-Sep-2017 C Resubmit
KHEP-SD-AR-A4-DET-GF-008
Revise &
Architectural 1 Approval 30-May-2017 C Resubmit
KHEP-SD-AR-A4-KD-GF-009
Revise &
Architectural 1 Approval 20-Sep-2017 C Resubmit
KHEP-SD-AR-A4-KD-GF-009
Approved
Architectural 1 Approval 14-Jun-2017 B w/ KHEP-SD-AR-G-001
Comments
Revise &
Architectural 1 Approval 8-Jun-2017 C Resubmit
KHEP-SD-AR-G-002
Revise &
Architectural 1 Approval 29-Nov-2017 C Resubmit
KHEP-SD-AR-G-002
Revise &
Architectural 1 Approval 8-Jun-2017 C Resubmit
KHEP-SD-AR-G-003
Revise &
Architectural 1 Approval 8-Jun-2017 C Resubmit
KHEP-SD-AR-G-004
Approved
Architectural 1 Approval 8-Jun-2017 B w/ KHEP-SD-AR-G-005
Comments
Approved
Architectural 1 Approval 15-Jun-2017 B w/ KHEP-SD-AR-G-006
Comments
Approved
Architectural 1 Approval 16-Jul-2017 B w/ KHEP-SD-AR-G-006
Comments
KHEP-SD-AR-B2-PL-GF-001
Revise & KHEP-SD-AR-B2-PL-FF-002
Architectural 2 Informatiom 16-Jul-2017
Resubmit KHEP-SD-AR-B2-PL-RF-003
KHEP-SD-AR-B2-ELEV-004
Revise &
Architectural 2 Informatiom 16-Jul-2017 KHEP-SD-AR-B2-ELEV-005
Resubmit
Approved
Architectural 1 Approval 26-Jul-2017 B w/ KHEP-SD-AR-G-008
Comments
Approved
Architectural 1 Approval 26-Jul-2017 B w/ KHEP-SD-AR-G-009
Comments
Approved
Architectural 1 Approval 21-Sep-2017 B w/ KHEP-SD-AR-G-009
Comments
Revise &
Architectural 1 Approval 20-Sep-2017 C Resubmit
KHEP-SD-AR-B2-DET-011
Approved
Architectural 1 Approval 12-Nov-2017 B w/ KHEP-SD-AR-B2-DET-011
Comments
Approved
Architectural 1 Approval 20-Sep-2017 B w/ KHEP-SD-AR-G-010
Comments
KHEP-SD-AR-AB-PL-GF-001
Revise &
Architectural 1 Approval 12-Nov-2017 C Resubmit
KHEP-SD-AR-AB-PL-RF-002
Approved
Architectural 1 Approval 12-Nov-2017 B w/ KHEP-SD-AR-PTA-FIX-GF-004
Comments
KHEP-SD-AR-B2-DET-GF-009
(SHEET 1 OF 2)
KHEP-SD-AR-B2- DET-GF-009
Revise &
Architectural 1 Approval 31-Oct-2017 C Resubmit
(SHEET 2 OF 2)
KHEP-SD-AR-B2- DET-FF-010
(KHEP-SD-AR-004-01)
KHEP-SD-AR-B2-DET-GF-009
(SHEET 1 OF 2)
Approved KHEP-SD-AR-B2- DET-GF-009
Architectural 1 Approval 20-Dec-2017 B w/ (SHEET 2 OF 2)
Comments KHEP-SD-AR-B2- DET-FF-010
(KHEP-SD-AR-004-01)
Approved KHEP-SD-AR-AB-ELEV-008
Architectural 1 Approval 30-Oct-2017 B w/ KHEP-SD-AR-AB-ELEV-009
Comments
Approved KHEP-SD-AR-PT-ELEV-014
Architectural 1 Approval 30-Oct-2017 B w/ KHEP-SD-AR-PT-ELEV-015
Comments
Approved KHEP-SD-AR-PTA-ELEV-014
Architectural 1 Approval 30-Oct-2017 B w/ KHEP-SD-AR-PTA-ELEV-015
Comments
Revise &
Architectural 1 Approval 29-Nov-2017 C Resubmit
KHEP-SD-AR-G-011
Approved
Architectural 1 Approval 11-Jan-2018 B w/ KHEP-SD-AR-G-013
Comments
Approved
Architectural 1 Approval 15-Jan-2018 B w/ KHEP-SD-AR-G-012
Comments
KHEP-SD-AR-G-014
KHEP-SD-AR-G-015
Revise &
Architectural 1 Approval 20-Jan-2018 C Resubmit
KHEP-SD-AR-G-016
KHEP-SD-AR-G-017
KHEP-SD-AR-G-018
Revise &
Architectural 1 Approval 11-Jan-2018 C Resubmit
KHEP-SD-AR-G-019
Approved
Architectural 1 Approval 11-Feb-2018 B w/ KHEP-SD-AR-G-019
Comments
Approved
Architectural 1 Approval 15-Jan-2018 B w/ KHEP-SD-AR-G-020
Comments
KHEP-SD-AR-G-021 (1 of 6)
KHEP-SD-AR-G-021 (2 of 6)
Approved
KHEP-SD-AR-G-021 (3 of 6)
Architectural 1 Approval 21-Jan-2018 B w/
KHEP-SD-AR-G-021 (4 of 6)
Comments
KHEP-SD-AR-G-021 (5 of 6)
KHEP-SD-AR-G-021 (6 of 6)
KHEP-SD-AR-G-021 (1 of 4)
Revise & KHEP-SD-AR-G-021 (2 of 4)
Architectural 1 Approval 15-Jan-2018 C Resubmit KHEP-SD-AR-G-021 (3 of 4)
KHEP-SD-AR-G-021 (4 of 4)
Revise & KHEP-SD-AR-G-023 (1 of 2)
Architectural 1 Approval 27-Jan-2018 C Resubmit KHEP-SD-AR-G-023 (2 of 2)
KHEP-SD-AR-G-023 (1 of 2)
Architectural 1 Approval 24-Feb-2018 A Approved
KHEP-SD-AR-G-023 (2 of 2)
KHEP-SD-AR-G-023 (1 of 4)
Approved
KHEP-SD-AR-G-023 (2 of 4)
Architectural 1 Approval 23-Jan-2018 B w/
KHEP-SD-AR-G-023 (3 of 4)
Comments
KHEP-SD-AR-G-023 (4 of 4)
Revise & KHEP-SD-AR-G-DET-001
Architectural 1 Approval 11-Feb-2018 C Resubmit KHEP-SD-AR-G-DET-002
KHEP-SD-AR-G-DET-001
Architectural 1 Approval
KHEP-SD-AR-G-DET-002
Revise &
Architectural 1 Approval 10-Feb-2018 C Resubmit
KHEP-SD-AR-G-025
Approved
Architectural 1 Approval 24-Feb-2018 B w/ KHEP-SD-AR-G-025
Comments
Approved
Architectural 1 Approval 24-Feb-2018 B w/ KHEP-SD-AR-G-026
Comments
Approved
KHEP-SD-AR-A4-PL-RF-003
Architectural 1 Approval 24-Feb-2018 B w/
(KHEP-SD-AR-0046-03)
Comments
Approved
KHEP-SD-AR-A6-PL-RF-003
Architectural 1 Approval 24-Feb-2018 B w/
(KHEP-SD-AR-0010-03)
Comments
Approved
KHEP-SD-AR-B2-PL-RF-003
Architectural 1 Approval 24-Feb-2018 B w/
(KHEP-SD-AR-0010-03)
Comments
Revise &
Civil 1 Approval 30-Jan-2017 C Resubmit
KAUST-SHOP-DW-0001 to 0005
Approved
Civil 1 Approval 30-Jan-2017 B w/ 1356-Shop-Mobilizaiton-0001
Comments
1356-SHOP-C-SD-0001
1356-SHOP-C-SD-0002
Approved 1356-SHOP-C-SD-0003
Civil 1 Approval 30-Jan-2017 B w/ 1356-SHOP-C-SD-0004
Comments 1356-SHOP-C-SD-0005
1356-SHOP-C-SD-0006
1356-SHOP-C-SD-0007
Revise &
Civil 1 Approval 30-Jan-2017 C Resubmit
1356DF-SHOP-C-BM-0001
Approved
Civil 1 Approval 5-Mar-2017 B w/ 1356DF-SHOP-C-BM-0001-01
Comments
Revise &
Civil 1 Approval 6-Jun-2017 C Resubmit
KHEP-SD-CI-SS-GMD-001
Approved
Civil 1 Approval 13-Jun-2017 B w/ KHEP-SD-CI-SS-GMD-001
Comments
Civil 1 Approval 15-Oct-2017 A Approved KHEP-SD-CI-SS-GMD-001
Approved
Civil 2 Information 30-Jan-2017 B w/ 1356DF-SHOP-C-GE-0001
Comments
Approved
Civil 1 Approval 1-Mar-2017 B w/ 1356DF-SHOP-C-GE-0002
Comments
1356DF-SD-CI-SDS-L-001
1356DF-SD-CI-2SDS-L-002-013
1356DF-SD-CI-SDS-P-L07A
1356DF-SD-CI-SDS-P-L07B
1356DF-SD-CI-SDS-P-L010
1356DF-SD-CI-SDS-P-L011A
1356DF-SD-CI-SDS-P-L011B
1356DF-SD-CI-SDS-P-L012
Revise & 1356DF-SD-CI-SDS-P-L013A
Civil 1 Approval 11-Mar-2017 C Resubmit 1356DF-SD-CI-SDS-P-L013B
1356DF-SD-CI-SDS-P-L013C
1356DF-SD-CI-SDS-P-L014
1356DF-SD-CI-SDS-P-L015A
1356DF-SD-CI-SDS-P-L015B
1356DF-SD-CI-SDS-P-L015C
1356DF-SD-CI-SDS-P-L016
1356DF-SD-CI-SDS-P-L017
1356DF-SD-CI-SDS-MSC-001
KHEP-SD-CI-SD-L-001
KHEP-SD-CI-SD-L-002
KHEP-SD-CI-SD-L-003
KHEP-SD-CI-SD-L-004
KHEP-SD-CI-SD-L-005
KHEP-SD-CI-SD-L-006
Revise &
Civil 1 Approval 15-Apr-2017 C Resubmit
KHEP-SD-CI-SD-L-007
KHEP-SD-CI-SD-L-008
KHEP-SD-CI-SD-L-009
KHEP-SD-CI-SD-L-010
KHEP-SD-CI-SD-L-011
KHEP-SD-CI-SD-L-012
KHEP-SD-CI-SD-L-013
KHEP-SD-CI-SD-P-001
KHEP-SD-CI-SD-P-002
KHEP-SD-CI-SD-P-003
KHEP-SD-CI-SD-P-004
KHEP-SD-CI-SD-P-005
Approved
KHEP-SD-CI-SD-P-006
Civil 1 Approval 16-May-2017 B w/
KHEP-SD-CI-SD-P-007
Comments
KHEP-SD-CI-SD-P-008
KHEP-SD-CI-SD-P-009
KHEP-SD-CI-SD-P-010
KHEP-SD-CI-SD-P-011
KHEP-SD-CI-SD-P-001
KHEP-SD-CI-SD-P-002
KHEP-SD-CI-SD-P-003
KHEP-SD-CI-SD-P-004
Approved KHEP-SD-CI-SD-P-005
Civil 1 Approval 8-Jun-2017 B w/ KHEP-SD-CI-SD-P-006
Comments KHEP-SD-CI-SD-P-007
KHEP-SD-CI-SD-P-008
KHEP-SD-CI-SD-P-009
KHEP-SD-CI-SD-P-010
KHEP-SD-CI-SD-P-011
1356DF-SD-CI-RB-001 1356DF-
Revise & SD-CI-RB-002 TO 007 1356DF-SD-CI-RB-
Civil 1 Approval 5-Mar-2017 C Resubmit 008 1356DF-SD-CI-RB-009
Approved
Civil 1 Approval 20-Mar-2017 B w/ KHEP-SD-CI-GR-001 to 013
Comments
KHEP-SD-CI-RD-L-001
KHEP -SD-CI-RD-L-002 TO 011
KHEP-SD-CI-RD-P-001 TO 004
KHEP-SD-CI-RD-P-005 TO 010
KHEP-SD-CI-RD-P-011 TO 012
KHEP-SD-CI-RD-P-013 TO 017
KHEP-SD-CI-RD-P-018
KHEP-SD-CI-RD-P-019
KHEP-SD-CI-RD-P-020
KHEP-SD-CI-RD-P-021
Revise & KHEP-SD-CI-RD-P-022
Civil 1 Approval 12-Mar-2017 C Resubmit KHEP-SD-CI-RD-P-023
KHEP-SD-CI-RD-P-024
KHEP-SD-CI-RD-P-025
KHEP-SD-CI-RD-P-026
KHEP-SD-CI-RD-P-027
KHEP-SD-CI-RD-P-028
KHEP-SD-CI-RD-P-029
KHEP-SD-CI-RD-P-030
KHEP-SD-CI-RD-P-031
KHEP-SD-CI-RD-P-032
KHEP-SD-CI-RD-L-001
KHEP -SD-CI-RD-L-002 TO 011
KHEP-SD-CI-RD-P-001 TO 004
KHEP-SD-CI-RD-P-005 TO 010
Approved KHEP-SD-CI-RD-P-011 TO 012
Civil 1 Approval 30-Mar-2017 B w/ KHEP-SD-CI-RD-P-013 TO 017
Comments KHEP-SD-CI-RD-P-018
KHEP-SD-CI-RD-P-019
KHEP-SD-CI-RD-P-020
KHEP-SD-CI-RD-P-021
KHEP-SD-CI-RD-
KHEP-SD-CI-RD-SEC-001 TO 35
Civil 1 Approval Recalled KHEP-SD-CI-RD-SEC-037 TO 64
KHEP-SD-CI-SS-L-001
Revise &
Civil 1 Approval 21-Mar-2017 C Resubmit
KHEP-SD-CI-SS-L-002 TO 009
KHEP-SD-CI-SS-P-001 TO 009
Approved
KHEP-SD-CI-SS-L-001
Civil 1 Approval 6-Apr-2017 B w/
KHEP-SD-CI-SS-L-002 TO 013
Comments
KHEP-SD-CI-SS-TBD-001
Revise &
Civil 1 Approval 23-Mar-2017 C Resubmit
KHEP-SD-CI-SS-MCD-002 KHEP-SD-CI-
SS-MDS-003 KHEP-SD-CI-SS-IC-004
KHEP-SD-CI-SD-PMD-001
Revise & KHEP-SD-CI-SD-PMD-002
Civil 1 Approval 10-May-2017 C Resubmit KHEP-SD-CI-SD-TYP-007
KHEP-SD-CI-SD-MRD-008
KHEP-SD-CI-SD-PMD-001
Approved
KHEP-SD-CI-SD-PMD-002
Civil 1 Approval 23-May-2017 B w/
KHEP-SD-CI-SD-TYP-007
Comments
KHEP-SD-CI-SD-MRD-008
Approved
KHEP-SD-CI-SD-MD-003
Civil 1 Approval 10-May-2017 B w/
Comments
KHEP-SD-CI-SD-CBD-004
Revise &
Civil 1 Approval 11-May-2017 C Resubmit
KHEP-SD-CI-SD-CBD-005
KHEP-SD-CI-SD-SC-006
Approved KHEP-SD-CI-SD-CBD-004
Civil 1 Approval 17-May-2017 B w/ KHEP-SD-CI-SD-CBD-005
Comments KHEP-SD-CI-SD-SC-006
KHEP-SD-CI-IR-L-001
KHEP-SD-CI-IR-L-002
KHEP-SD-CI-IR-L-003
KHEP-SD-CI-IR-L-004
KHEP-SD-CI-IR-L-005
KHEP-SD-CI-IR-L-006
Revise &
Civil 1 Approval 30-May-2017 C Resubmit
KHEP-SD-CI-IR-L-007
KHEP-SD-CI-IR-L-008
KHEP-SD-CI-IR-L-009
KHEP-SD-CI-IR-L-010
KHEP-SD-CI-IR-L-011
KHEP-SD-CI-IR-L-012
KHEP-SD-CI-IR-L-013
KHEP-SD-CI-IR-L-001
KHEP-SD-CI-IR-L-002
KHEP-SD-CI-IR-L-003
KHEP-SD-CI-IR-L-004
KHEP-SD-CI-IR-L-005
KHEP-SD-CI-IR-L-006
Revise &
Civil 1 Approval 10-Aug-2017 C Resubmit
KHEP-SD-CI-IR-L-007
KHEP-SD-CI-IR-L-008
KHEP-SD-CI-IR-L-009
KHEP-SD-CI-IR-L-010
KHEP-SD-CI-IR-L-011
KHEP-SD-CI-IR-L-012
KHEP-SD-CI-IR-L-013
KHEP-SD-CI-IR-L-001
KHEP-SD-CI-IR-L-002
KHEP-SD-CI-IR-L-003
KHEP-SD-CI-IR-L-004
KHEP-SD-CI-IR-L-005
Approved KHEP-SD-CI-IR-L-006
Civil 1 Approval 29-Aug-2017 B w/ KHEP-SD-CI-IR-L-007
Comments KHEP-SD-CI-IR-L-008
KHEP-SD-CI-IR-L-009
KHEP-SD-CI-IR-L-010
KHEP-SD-CI-IR-L-011
KHEP-SD-CI-IR-L-012
KHEP-SD-CI-IR-L-013
KHEP-SD-CI-IR-L-001
KHEP-SD-CI-IR-L-002
KHEP-SD-CI-IR-L-003
KHEP-SD-CI-IR-L-004
KHEP-SD-CI-IR-L-005
Approved KHEP-SD-CI-IR-L-006
Civil 1 Approval 22-Nov-2017 B w/ KHEP-SD-CI-IR-L-007
Comments KHEP-SD-CI-IR-L-008
KHEP-SD-CI-IR-L-009
KHEP-SD-CI-IR-L-010
KHEP-SD-CI-IR-L-011
KHEP-SD-CI-IR-L-012
KHEP-SD-CI-IR-L-013
Revise &
Civil 1 Approval 20-May-2017 C Resubmit
KHEP-SD-CI-PF-VC-001
Approved
Civil 1 Approval 4-Jul-2017 B w/ KHEP-SD-CI-PF-VC-001
Comments
Approved
Civil 1 Approval 22-Jan-2018 B w/ KHEP-SD-CI-PF-VC-001
Comments
KHEP-SD-CI-SS-BD-001
Revise & KHEP-SD-CI-SS-BD-002
Civil 1 Approval 23-May-2017 C Resubmit KHEP-SD-CI-SS-BD-003
KHEP-SD-CI-SS-BD-001
Revise & KHEP-SD-CI-SS-BD-002
Civil 1 Approval 11-Jun-2017 C Resubmit KHEP-SD-CI-SS-BD-003
KHEP-SD-CI-SS-BD-001
Revise & KHEP-SD-CI-SS-BD-002
Civil 1 Approval 4-Jul-2017 C Resubmit KHEP-SD-CI-SS-BD-003
KHEP-SD-CI-SS-BD-001
KHEP-SD-CI-SS-BD-002
Civil 1 Approval 28-Aug-2017 A Approved
KHEP-SD-CI-SS-BD-003
KHEP-SD-CI-CU-L-001
KHEP-SD-CI-CU-L-002
Revise &
Civil 1 Approval 28-May-2017 C Resubmit
TO
KHEP-SD-CI-CU-L-013
KHEP-SD-CI-CU-L-001
KHEP-SD-CI-CU-L-002
Revise &
Civil 1 Approval 19-Sep-2017 C Resubmit
TO
KHEP-SD-CI-CU-L-013
Revise &
Civil 1 Approval 4-Jun-2017 C Resubmit
KHEP-SD-CI-RB-L-001
Revise &
Civil 1 Approval 12-Aug-2017 C Resubmit
KHEP-SD-CI-RB-L-001
Revise &
Civil 1 Approval 24-Aug-2017 C Resubmit
KHEP-SD-CI-RB-L-001
Revise &
Civil 1 Approval 8-Jun-2017 C Resubmit
KHEP-SD-CI-HTD-001
KHEP-SD-CI-PF-AVC-001
Revise &
Civil 1 Approval 4-Jul-2017 C Resubmit
KHEP-SD-CI-PF-WVC-002
KHEP-SD-CI-PF-TBD-003
KHEP-SD-CI-PF-AVC-001
Revise &
Civil 1 Approval 24-Aug-2017 B Resubmit
KHEP-SD-CI-PF-WVC-002
KHEP-SD-CI-PF-TBD-003
KHEP-SD-CI-PF-AVC-001
Revise &
Civil 1 Approval 15-Oct-2017 C Resubmit
KHEP-SD-CI-PF-WVC-002
KHEP-SD-CI-PF-TBD-003
KHEP-SD-CI-PF-AVC-001
Revise &
Civil 1 Approval 23-Oct-2017 B Resubmit
KHEP-SD-CI-PF-WVC-002
KHEP-SD-CI-PF-TBD-003
Revise &
Civil 1 Approval 13-Jun-2017 C Resubmit
KHEP-SD-CI-PF-FHD-001
Revise &
Civil 1 Approval 11-Jul-2017 C Resubmit
KHEP-SD-CI-PF-FHD-001
Approved
Civil 1 Approval 20-Aug-2017 B w/ KHEP-SD-CI-PF-FHD-001
Comments
Revise &
Civil 1 Approval 10-Jul-2017 C Resubmit
KHEP-SD-CI-SD-PSD-001
Revise &
Civil 1 Approval 29-Jul-2017 C Resubmit
KHEP-SD-CI-SS-ICD-001
Revise &
Civil 1 Approval 10-Aug-2017 C Resubmit
KHEP-SD-CI-SD-OFD-001
Approved
Civil 1 Approval 24-Oct-2017 B w/ KHEP-SD-CI-SD-OFD-001
Comments
KHEP-SD-LS-HL-001
KHEP-SD-LS-HL-002
Approved
TO
Civil 1 Approval 1-Aug-2017 B w/
KHEP-SD-LS-HL-013
Comments
KHEP-SD-LS-HLG-014
KHEP-SD-CI-CU-SEC-001
KHEP-SD-CI-CU-SEC-002
Revise &
Civil 1 Approval 19-Sep-2017 C Resubmit
KHEP-SD-CI-CU-SEC-003
KHEP-SD-CI-CU-SEC-004
KHEP-SD-CI-CU-SEC-005
KHEP-SD-CI-IR-TBD-001
Revise & KHEP-SD-CI-IR-AVC-002
Civil 1 Approval 7-Aug-2017 C Resubmit KHEP-SD-CI-IR-WVC-003
KHEP-SD-CI-IR-VC-004
KHEP-SD-CI-IR-TBD-001
Approved
KHEP-SD-CI-IR-AVC-002
Civil 1 Approval 16-Aug-2017 B w/
KHEP-SD-CI-IR-WVC-003
Comments
KHEP-SD-CI-IR-VC-004
KHEP-SD-CI-RD-S-001
Revise & KHEP-SD-CI-RD-S-002
Civil 1 Approval 13-Aug-2017 C Resubmit KHEP-SD-CI-RD-M-001
KHEP-SD-CI-RD-M-002 upto 013
Approved
KHEP-SD-CI-RD-S-001
Civil 1 Approval 15-Oct-2017 B w/
KHEP-SD-CI-RD-S-002
Comments
Approved
Civil 1 Approval 20-Aug-2017 B w/ KHEP-SD-CI-PF-HCD-001
Comments
Approved
Civil 1 Approval 24-Oct-2017 B w/ KHEP-SD-CI-PF-HCD-001
Comments
Revise &
Civil 1 Approval 12-Aug-2017 C Resubmit
KHEP-SD-CI-SD-MDT-001
Approved
Civil 1 Approval 16-Aug-2017 B w/ KHEP-SD-CI-SD-MDT-001
Comments
Revise &
Civil 1 Approval 14-Sep-2017 C Resubmit
KHEP-SD-CI-RD-S-003
Approved
Civil 1 Approval 19-Sep-2017 B w/ KHEP-SD-CI-RD-S-003
Comments
Revise &
Civil 1 Approval 7-Oct-2017 C Resubmit
KHEP-SD-CI-SD-CBSL-001
Revise &
Civil 1 Approval 16-Oct-2017 C Resubmit
KHEP-SD-CI-SD-CBSL-001
KHEP-SD-CI-SS-ICPL-001
Revise &
Civil 1 Approval 16-Oct-2017 C Resubmit
KHEP-SD-CI-SS-BDSL-002
Approved KHEP-SD-CI-SS-ICPL-001
Civil 1 Approval 30-Oct-2017 B w/ KHEP-SD-CI-SS-BDSL-002
Comments
KHEP-SD-CI-IR-SCH-001
Revise &
Civil 1 Approval 22-Nov-2017 C Resubmit
KHEP-SD-CI-IR-CCD-002
Approved
Civil 1 Approval 16-Dec-2017 B w/ KHEP-SD-CI-IR-THBD-001
comments
KHEP-SD-CI-FG-L-001
KHEP-SD-CI-FG-L-002
Revise &
Civil 1 Approval 26-Dec-2017 C Resubmit
TO
KHEP-SD-CI-FG-L-013
KHEP-SD-CI-FG-L-001
KHEP-SD-CI-FG-L-002
Revise &
Civil 1 Approval 9-Jan-2018 C Resubmit
TO
KHEP-SD-CI-FG-L-013
Revise &
Civil 1 Approval 21-Dec-2017 C Resubmit
KHEP-SD-CI-RD-BC-001
Revise &
Civil 1 Approval 4-Jan-2018 C Resubmit
KHEP-SD-CI-RD-BC-001
Revise &
Civil 1 Approval 31-Jan-2018 C Resubmit
KHEP-SD-CI-RD-BC-001
Revise &
Civil 1 Approval 4-Jan-2018 C Resubmit
KHEP-SD-CI-RD-INT-001
KHEP-SD-CI-ABPT-L-001
Revise &
Civil 1 Approval 27-Jan-2018 C Resubmit
KHEP-SD-CI-PT-L-002
KHEP-SD-CI-PT-L-003
KHEP-SD-CI-ABPT-L-001
Civil 1 Approval 31-Jan-2018 A Approved KHEP-SD-CI-PT-L-002
KHEP-SD-CI-PT-L-003
KHEP-SD-CI-DL-001
KHEP-SD-CI-DL-002
Civil 1 Approval
to
KHEP-SD-CI-DL-01
1356DF-SD-EL- FA-B2-GF-001
1356DF-SD-EL-FA-B2-FF-002
1356DF-SD-EL-LT-B2-GF-001
1356DF-SD-EL-LT-B2-FF-002
Revise &
Electrical 1 Approval 4-Mar-2017 C Resubmit
1356DF-SD-EL-LT-B2-RF-003
1356DF-SD-EL-EP-B2-GF-001
1356DF-SD-EL-EP-B2-FF-002
1356DF-SD-EL-EP-B2-RF-003
1356DF-SD-EL-ER-B2-GF-001
1356DF-SD-E-EG-051
1356DF-SD-E-EG-052
1356DF-SD-E-EG-801
1356DF-SD-E-EG-802
1356DF-SD-E-EG-803 1356DF-
SD-E-EG-804 1356DF-SD-E-LL-
Revise & 400 1356DF-SD-E-LS-
Electrical 1 Approval 18-Mar-2017 C Resubmit 500 1356DF-SD-E-MV-
200 1356DF-SD-E-LV-300
1356DF-SD-E-PS-501
1356DF-SD-E-PS-502
1356DF-SD-E-PS-503 1356DF-
SD-E-PS-504 1356DF-SD-E-
PS-505 1356DF-SD-T-TY-100
KHEP-SD-EL-MV-SLD-051
KHEP-SD-EL-MV-SLD-052
KHEP-SD-EL-ID-801
KHEP-SD-EL-ID-802
KHEP-SD-EL-ID-803
KHEP-SD-EL-ID-804
Revise &
Electrical 1 Approval 8-Apr-2017 C Resubmit
KHEP-SD-EL-PS-501
KHEP-SD-EL-PS-502
KHEP-SD-EL-PS-503
KHEP-SD-EL-PS-504
KHEP-SD-EL-PS-505
KHEP-SD-LC-CC-CO-100
KHEP-SD-EL-MV-SLD-051
KHEP-SD-EL-MV-SLD-052
KHEP-SD-EL-ID-801
KHEP-SD-EL-ID-802
KHEP-SD-EL-ID-803
KHEP-SD-EL-ID-804
Electrical 1 Approval 20-Apr-2017 A Approved
KHEP-SD-EL-PS-501
KHEP-SD-EL-PS-502
KHEP-SD-EL-PS-503
KHEP-SD-EL-PS-504
KHEP-SD-EL-PS-505
KHEP-SD-LC-CC-CO-100
Approved KHEP-SD-EL-A6-ER-GF-001
Electrical 1 Approval 18-Mar-2017 B w/ KHEP-SD-EL-B4-ER-GF-001
comments KHEP-SD-EL-B6-ER-GF-001
Revise &
Electrical 1 Approval 21-Mar-2017 C Resubmit
KHEP-SD-EL-CC-CO-100
KHEP-SD-EL-A6-EP-GF-001
Approved
KHEP-SD-EL-A6-EP-FF-002
Electrical 1 Approval 27-Dec-2017 B w/
KHEP-SD-EL-A6-EP-RF-003
comments
KHEP-SD-EL-GN-CP-000 KHEP-
SD-EL-GN-DI-001
KHEP-SD-EL-GN-LE-002
KHEP-SD-EL-LV-SLD-101
KHEP-SD-EL-LV-SLD-101
KHEP-SD-EL-LV-SLD-102
KHEP-SD-EL-LV-SLD-103
KHEP-SD-EL-LV-SLD-104
KHEP-SD-EL-LV-SLD-105
KHEP-SD-EL-LV-SLD-106
KHEP-SD-EL-LV-SLD-107
Electrical 1 Approval 6-Apr-2017 A Approved
KHEP-SD-EL-LV-SLD-108
KHEP-SD-EL-LV-SLD-109
KHEP-SD-EL-LV-SLD-110
KHEP-SD-EL-LV-SLD-111
KHEP-SD-EL-LV-SLD-112
KHEP-SD-EL-LV-SLD-113
KHEP-SD-EL-LV-SLD-114
KHEP-SD-EL-LV-SLD-115
KHEP-SD-EL-LV-SLD-116
KHEP-SD-EL-LV-SLD-117
KHEP-SD-EL-A6-FA-GF-001
Electrical 1 Approval 28-Mar-2017 E Rejected
KHEP-SD-EL-A6-FA-FF-002
Revise & KHEP-SD-EL-A6-FA-GF-001
Electrical 1 Approval 18-Apr-2017 C Resubmit KHEP-SD-EL-A6-FA-FF-002
KHEP-SD-EL-A6-FA-GF-001
Revise &
Electrical 1 Approval 3-Jan-2018 C Resubmit
KHEP-SD-EL-A6-FA-FF-002
KHEP-SD-EL-A6-FA-SL-001
KHEP-SD-EL-A6-FA-GF-001
KHEP-SD-EL-A6-FA-FF-002
Revise &
Electrical 1 Approval 11-Feb-2018 C Resubmit
KHEP-SD-EL-A6-FA-SL-001
KHEP-SD-EL-A6-FA-G-002
KHEP-SD-EL-A6-FA-G-003
KHEP-SD-EL-A6-PM-GF-001
Revise &
Electrical 1 Approval 8-Apr-2017 C Resubmit
KHEP-SD-EL-A6-PM-FF-002
KHEP-SD-EL-A6-PM-RF-003
KHEP-SD-EL-A6-PM-GF-001
Revise &
Electrical 1 Approval 11-May-2017 C Resubmit
KHEP-SD-EL-A6-PM-FF-002
KHEP-SD-EL-A6-PM-RF-003
KHEP-SD-EL-A6-PM-GF-001
Revise &
Electrical 1 Approval 23-May-2017 C Resubmit
KHEP-SD-EL-A6-PM-FF-002
KHEP-SD-EL-A6-PM-RF-003
KHEP-SD-EL-A6-PM-GF-001
Electrical 1 Approval 1-Jun-2017 A Approved KHEP-SD-EL-A6-PM-FF-002
KHEP-SD-EL-A6-PM-RF-003
KHEP-SD-EL-A6-PM-GF-001
Electrical 1 Approval 24-Oct-2017 A Approved KHEP-SD-EL-A6-PM-FF-002
KHEP-SD-EL-A6-PM-RF-003
Revise & KHEP-SD-EL-A6-PS-TA01
Electrical 1 Approval 5-Apr-2017 C Resubmit KHEP-SD-EL-A6-PS-TA02
KHEP-SD-EL-A6-PS-TA01
Electrical 1 Approval 22-May-2017 A Approved
KHEP-SD-EL-A6-PS-TA02
Approved
KHEP-SD-EL-A6-PS-TA01
Electrical 1 Approval 24-Oct-2017 B w/
KHEP-SD-EL-A6-PS-TA02
comments
KHEP-SD-EL-A6-PS-TA01
Electrical 1 Approval 8-Nov-2017 A Approved
KHEP-SD-EL-A6-PS-TA02
Revise &
Electrical 1 Approval 5-Apr-2017 C Resubmit
KHEP-SD-EL-A4-ER-GF-001
KHEP-SD-EL-LL-401
KHEP-SD-EL-LL-402
KHEP-SD-EL-LL-403
KHEP-SD-EL-LL-404
KHEP-SD-EL-LL-405
KHEP-SD-EL-LL-406
Revise &
Electrical 1 Approval 29-Apr-2017 C Resubmit
KHEP-SD-EL-LL-407
KHEP-SD-EL-LL-408
KHEP-SD-EL-LL-409
KHEP-SD-EL-LL-410
KHEP-SD-EL-LL-411
KHEP-SD-EL-LL-412
KHEP-SD-EL-LL-401
KHEP-SD-EL-LL-402
KHEP-SD-EL-LL-403
KHEP-SD-EL-LL-404
KHEP-SD-EL-LL-405
Approved
KHEP-SD-EL-LL-406
Electrical 1 Approval 24-May-2017 C w/
KHEP-SD-EL-LL-407
comments
KHEP-SD-EL-LL-408
KHEP-SD-EL-LL-409
KHEP-SD-EL-LL-410
KHEP-SD-EL-LL-411
KHEP-SD-EL-LL-412
KHEP-SD-EL-LL-401
KHEP-SD-EL-LL-402
KHEP-SD-EL-LL-403
KHEP-SD-EL-LL-404
KHEP-SD-EL-LL-405
KHEP-SD-EL-LL-406
Electrical 1 Approval 15-Jun-2017 A Approved
KHEP-SD-EL-LL-407
KHEP-SD-EL-LL-408
KHEP-SD-EL-LL-409
KHEP-SD-EL-LL-410
KHEP-SD-EL-LL-411
KHEP-SD-EL-LL-412
KHEP-SD-EL-LS-501
KHEP-SD-EL-LS-502
KHEP-SD-EL-LS-503
KHEP-SD-EL-LS-504
KHEP-SD-EL-LS-505
Revise &
Electrical 1 Approval 14-May-2017 C Resubmit
KHEP-SD-EL-LS-506
KHEP-SD-EL-LS-507
KHEP-SD-EL-LS-508
KHEP-SD-EL-LS-509
KHEP-SD-EL-LS-510
KHEP-SD-EL-LS-501
KHEP-SD-EL-LS-502
KHEP-SD-EL-LS-503
KHEP-SD-EL-LS-504
KHEP-SD-EL-LS-505
Electrical 1 Approval 31-May-2017 A Approved
KHEP-SD-EL-LS-506
KHEP-SD-EL-LS-507
KHEP-SD-EL-LS-508
KHEP-SD-EL-LS-509
KHEP-SD-EL-LS-510
KHEP-SD-EL-LV-301
KHEP-SD-EL-LV-302
KHEP-SD-EL-LV-303
KHEP-SD-EL-LV-304
KHEP-SD-EL-LV-305
Approved KHEP-SD-EL-LV-306
Electrical 1 Approval 13-Apr-2017 B w/ KHEP-SD-EL-LV-307
comments KHEP-SD-EL-LV-308
KHEP-SD-EL-LV-309
KHEP-SD-EL-LV-310
KHEP-SD-EL-LV-311
KHEP-SD-EL-LV-312
1356DF-SD-E-LL-400
Electrical 1 Approval 4-May-2017 A Approved 1356DF-SD-E-LS-500
1356DF-SD-E-MV-200
Electrical 1 Approval 20-Apr-2017 A Approved KHEP-SD-EL-LV-300
KHEP -SD-EL- B2-ER- GF-001
Electrical 1 Approval 20-Apr-2017 A Approved RELATED TRANSMITTAL:
KHEP- SD-EL-0001-01
KHEP-SD-EL-B4-LT-GF-002
Revise &
Electrical 1 Approval 15-May-2017 C Resubmit
KHEP-SD-EL-B4-LT-FF-003
KHEP-SD-EL-B4-LT-RF-004
KHEP-SD-EL-B4-LT-GF-002
Revise &
Electrical 1 Approval 31-May-2017 C Resubmit
KHEP-SD-EL-B4-LT-FF-003
KHEP-SD-EL-B4-LT-RF-004
Approved KHEP-SD-EL-B4-LT-GF-002
Electrical 1 Approval 28-Aug-2017 B w/ KHEP-SD-EL-B4-LT-FF-003
comments KHEP-SD-EL-B4-LT-RF-004
KHEP-SD-EL-B4-EP-GF-005
Revise &
Electrical 1 Approval 29-Apr-2017 C Resubmit
KHEP-SD-EL-B4-EP-FF-006
KHEP-SD-EL-B4-EP-RF-007
KHEP-SD-EL-B4-EP-GF-005
Revise &
Electrical 1 Approval 23-May-2017 C Resubmit
KHEP-SD-EL-B4-EP-FF-006
KHEP-SD-EL-B4-EP-RF-007
KHEP-SD-EL-B4-EP-GF-005
Electrical 1 Approval 1-Jun-2017 A Approved KHEP-SD-EL-B4-EP-FF-006
KHEP-SD-EL-B4-EP-RF-007
KHEP-SD-EL-B4-PM-GF-008
Revise &
Electrical 1 Approval 4-May-2017 C Resubmit
KHEP-SD-EL-B4-PM-FF-009
KHEP-SD-EL-B4-PM-RF-010
KHEP-SD-EL-B4-PM-GF-008
Revise & KHEP-SD-EL-B4-PM-FF-009
Electrical 1 Approval 23-May-2017 C Resubmit KHEP-SD-EL-B4-PM-RF-010
KHEP-SD-EL-B4-PM-GF-008
KHEP-SD-EL-B4-PM-FF-009
Electrical 1 Approval 1-Jun-2017 A Approved
KHEP-SD-EL-B4-PM-RF-010
Approved
KHEP-SD-EL-B4-TE-GF-011
Electrical 1 Approval 25-May-2017 B w/
KHEP-SD-EL-B4-TE-FF-012
comments
Revise & KHEP-SD-EL-B4-TE-GF-011
Electrical 1 Approval 2-Jan-2018 C Resubmit KHEP-SD-EL-B4-TE-FF-012
KHEP-SD-EL-B4-TE-GF-011
Electrical 1 Approval 24-Jan-2018 A Approved
KHEP-SD-EL-B4-TE-FF-012
Revise & KHEP-SD-EL-B4-FA-GF-013
Electrical 1 Approval 30-Apr-2017 C Resubmit KHEP-SD-EL-B4-FA-FF-014
KHEP-SD-EL-B4-FA-GF-013
Revise &
Electrical 1 Approval 3-Jan-2018 C Resubmit
KHEP-SD-EL-B4-FA-FF-014
KHEP-SD-EL-B4-FA-SL-018
Approved
KHEP-SD-EL-B4-PS-TB1-015
Electrical 1 Approval 4-May-2017 B w/
KHEP-SD-EL-B4-PS-TB2-016
comments
KHEP-SD-EL-B4-PS-TB1-015
Electrical 1 Approval 8-Nov-2017 A Approved
KHEP-SD-EL-B4-PS-TB2-016
Electrical 1 Approval 4-May-2017 A Approved KHEP-SD-EL-LV-SLD-118
KHEP -SD-EL- B2-EP- GF-001
KHEP -SD-EL- B2-EP- FF-002
Revise &
Electrical 1 Approval 29-Apr-2017 C Resubmit
KHEP -SD-EL- B2-EP- RF-003
RELATED TRANSMITTAL: KHEP-
SD-EL-0001-01
KHEP -SD-EL- B2-EP- GF-001
KHEP -SD-EL- B2-EP- FF-002
Revise & KHEP -SD-EL- B2-EP- RF-003
Electrical 1 Approval 23-May-2017 C Resubmit RELATED TRANSMITTAL: KHEP-
SD-EL-0001-01 KHEP-SD-EL-
0034-00
KHEP -SD-EL- B2-EP- GF-001
Electrical 1 Approval 19-Jun-2017 A Approved KHEP -SD-EL- B2-EP- FF-002
KHEP -SD-EL- B2-EP- RF-003
Approved KHEP -SD-EL- B2-EP- GF-001
Electrical 1 Approval 13-Nov-2017 B w/ KHEP -SD-EL- B2-EP- FF-002
comments KHEP -SD-EL- B2-EP- RF-003
KHEP-SD-EL-A6-TE-GF-001
Approved
KHEP-SD-EL-A6-TE-FF-002
Electrical 1 Approval 25-May-2017 B w/
RELATED TRANSMITTAL: KHEP-SD-EL-
comments
0008-00
KHEP-SD-EL-A6-TE-GF-001
Revise & KHEP-SD-EL-A6-TE-FF-002
Electrical 1 Approval 26-Oct-2017 C Resubmit RELATED TRANSMITTAL: KHEP-SD-EL-
0008-00
KHEP-SD-EL-A6-TE-GF-001
Revise & KHEP-SD-EL-A6-TE-FF-002
Electrical 1 Approval 14-Nov-2017 C Resubmit RELATED TRANSMITTAL: KHEP-SD-EL-
0008-00
KHEP-SD-EL-A6-TE-GF-001
Revise & KHEP-SD-EL-A6-TE-FF-002
Electrical 1 Approval 2-Jan-2018 C Resubmit RELATED TRANSMITTAL: KHEP-SD-EL-
0008-00
KHEP-SD-EL-A6-TE-GF-001
Electrical 1 Approval 24-Jan-2018 A Approved
KHEP-SD-EL-A6-TE-FF-002
KHEP -SD-EL- B2-LT- GF-001
KHEP -SD-EL- B2-LT- FF-002
Revise &
Electrical 1 Approval 17-May-2017 C Resubmit
KHEP -SD-EL- B2-LT- RF-003
RELATED TRANSMITTAL:
KHEP-SD-EL-0001-01
KHEP -SD-EL- B2-LT- GF-001
Revise & KHEP -SD-EL- B2-LT- FF-002
Electrical 1 Approval 31-May-2017 C Resubmit KHEP -SD-EL- B2-LT- RF-003
Approved KHEP-SD-EL-B6-EP-GF-005
Electrical 1 Approval 23-May-2017 B w/ KHEP-SD-EL-B6-EP-FF-006
comments KHEP-SD-EL-B6-EP-RF-007
Approved KHEP-SD-EL-B6-EP-GF-005
Electrical 1 Approval 4-Jan-2018 B w/ KHEP-SD-EL-B6-EP-FF-006
comments
KHEP-SD-EL-B6-PM-GF-008
Revise & KHEP-SD-EL-B6-PM-FF-009
Electrical 1 Approval 22-May-2017 C Resubmit KHEP-SD-EL-B6-PM-RF-010
KHEP-SD-EL-B6-PM-GF-008
KHEP-SD-EL-B6-PM-FF-009
Electrical 1 Approval 1-Jun-2017 A Approved
KHEP-SD-EL-B6-PM-RF-010
Approved
KHEP-SD-EL-B6-TE-GF-011
Electrical 1 Approval 25-May-2017 B w/
KHEP-SD-EL-B6-TE-FF-012
comments
KHEP-SD-EL-A6-LT-GF-001
Approved
KHEP-SD-EL-A6-LT-FF-002
Electrical 1 Approval 28-Aug-2017 B w/
KHEP-SD-EL-A6-LT-RF-003
comments
Approved KHEP-SD-EL-A6-LT-GF-001
Electrical 1 Approval 4-Jan-2018 B w/ KHEP-SD-EL-A6-LT-RF-003
comments Related DC KHEP-RFC-EL-0045-00
Approved
Electrical 1 Approval 13-Jul-2017 B w/ KHEP-SD-EL-AB-PM-001
comments
Approved
Electrical 1 Approval 13-Jul-2017 B w/ KHEP-SD-EL-AB-EP-002
comments
Approved
Electrical 1 Approval 13-Jul-2017 B w/ KHEP-SD-EL-AB-LT-003
comments
Approved
Electrical 1 Approval 13-Jul-2017 B w/ KHEP-SD-EL-AB-TE-005
comments
Revise &
Electrical 1 Approval 13-Jul-2017 C Resubmit
KHEP-SD-EL-AB-PS-007
Revise &
Electrical 1 Approval 8-Aug-2017 C Resubmit
KHEP-SD-EL-AB-PS-007
Revise &
Electrical 1 Approval 27-Jul-2017 C Resubmit
KHEP-SD-EL-PTA-ER-004
Approved
Electrical 1 Approval 27-Jul-2017 B w/ KHEP-SD-EL-PT-PM-001
comments
Approved
Electrical 1 Approval 27-Jul-2017 B w/ KHEP-SD-EL-PT-EP-002
comments
Approved
Electrical 1 Approval 27-Jul-2017 B w/ KHEP-SD-EL-PT-LT-003
comments
Revise &
Electrical 1 Approval 27-Jul-2017 C Resubmit
KHEP-SD-EL-PT-ER-004
Revise &
Electrical 1 Approval 26-Jul-2017 C Resubmit
KHEP-SD-EL-PT-TE-005
KHEP-SD-EL-A6-LT-FF-002
Electrical 1 Approval 19-Nov-2017 A Approved Related Document - KHEP-SD-EL-0064-00
KHEP-SD-EL-B2-LT-FF-002
Electrical 1 Approval 19-Nov-2017 A Approved Related Document - KHEP-SD-EL-0065-00
KHEP-SD-EL-B4-PM-GF-008
Revise &
Electrical 1 Approval 30-Dec-2017 C Resubmit
KHEP-SD-EL-B4-PM-FF-009
KHEP-SD-EL-B4-PM-RF-010
KHEP-SD-EL-B4-PM-GF-008
Revise &
Electrical 1 Approval 22-Jan-2018 C Resubmit
KHEP-SD-EL-B4-PM-FF-009
KHEP-SD-EL-B4-PM-RF-010
Approved KHEP-SD-EL-B4-PM-GF-008
Electrical 1 Approval 1-Feb-2018 B w/ KHEP-SD-EL-B4-PM-FF-009
comments KHEP-SD-EL-B4-PM-RF-010
KHEP-SD-EL-B4-PM-GF-008
Revise &
Electrical 1 Approval 21-Feb-2018 C Resubmit
KHEP-SD-EL-B4-PM-FF-009
KHEP-SD-EL-B4-PM-RF-010
Approved
KHEP-SD-EL-B4-EP-GF-005
Electrical 1 Approval 30-Dec-2017 B w/
KHEP-SD-EL-B4-EP-FF-006
comments
KHEP-SD-EL-B6-PM-GF-008
Revise &
Electrical 1 Approval 4-Jan-2018 C Resubmit
KHEP-SD-EL-B6-PM-FF-009
KHEP-SD-EL-B6-PM-RF-010
KHEP-SD-EL-B6-PM-GF-008
Revise &
Electrical 1 Approval 22-Jan-2018 C Resubmit
KHEP-SD-EL-B6-PM-FF-009
KHEP-SD-EL-B6-PM-RF-010
Approved KHEP-SD-EL-B6-PM-GF-008
Electrical 1 Approval 20-Feb-2018 B w/ KHEP-SD-EL-B6-PM-FF-009
comments KHEP-SD-EL-B6-PM-RF-010
KHEP-SD-EL-A4-ER-GF-001
Revise & KHEP-SD-EL-A4-LP-RF-001
Electrical 1 Approval 1-Jan-2018 C Resubmit Related Transmital - KHEP-SD-EL-0013-01
KHEP-SD-EL-A6-ER-GF-001
Revise & KHEP-SD-EL-A6-LP-RF-001
Electrical 1 Approval 1-Jan-2018 C Resubmit Related Transmital - KHEP-SD-EL-0013-01
KHEP-SD-EL-B2-ER-GF-001
Revise & KHEP-SD-EL-B2-LP-RF-001
Electrical 1 Approval 1-Jan-2018 C Resubmit Related Transmital - KHEP-SD-EL-0026-00
KHEP-SD-EL-B4-ER-GF-001
Revise & KHEP-SD-EL-B4-LP-RF-001
Electrical 1 Approval 1-Jan-2018 C Resubmit Related Transmital - KHEP-SD-EL-0005-00
KHEP-SD-EL-B6-ER-GF-001
Revise & KHEP-SD-EL-B6-LP-RF-001
Electrical 1 Approval 1-Jan-2018 C Resubmit Related Transmital - KHEP-SD-EL-0005-00
KHEP-SD-EL-A4-LT-GF-001
KHEP-SD-EL-A4-LT-FF-002
Approved
KHEP-SD-EL-A4-LT-RF-003
Electrical 1 Approval 4-Jan-2018 B w/
Related Transmital - KHEP-RFC-EL-
comments
0036-00 / KHEP-RFC-EL-0045-00
KHEP-SD-EL-A4-PM-GF-001
Revise & KHEP-SD-EL-A4-PM-FF-002
Electrical 1 Approval 2-Jan-2018 C Resubmit KHEP-SD-EL-A4-PM-RF-003
KHEP-SD-EL-A4-PM-GF-001
Revise &
Electrical 1 Approval 22-Jan-2018 C Resubmit
KHEP-SD-EL-A4-PM-FF-002
KHEP-SD-EL-A4-PM-RF-003
Approved KHEP-SD-EL-A4-PM-GF-001
Electrical 1 Approval 20-Feb-2018 B w/ KHEP-SD-EL-A4-PM-FF-002
comments KHEP-SD-EL-A4-PM-RF-003
KHEP-SD-EL-B6-FA-GF-013
Revise &
Electrical 1 Approval 3-Jan-2018 C Resubmit
KHEP-SD-EL-B6-FA-FF-014
KHEP-SD-EL-B6-FA-SL-019
KHEP-SD-EL-A6-PM-GF-001
Revise &
Electrical 1 Approval 22-Jan-2018 C Resubmit
KHEP-SD-EL-A6-PM-FF-002
KHEP-SD-EL-A6-PM-RF-003
Approved KHEP-SD-EL-A6-PM-GF-001
Electrical 1 Approval 20-Feb-2018 B w/ KHEP-SD-EL-A6-PM-FF-002
comments KHEP-SD-EL-A6-PM-RF-003
KHEP-SD-EL-B2-PM-GF-001
Revise &
Electrical 1 Approval 22-Jan-2018 C Resubmit
KHEP-SD-EL-B2-PM-FF-002
KHEP-SD-EL-B2-PM-RF-003
Approved KHEP-SD-EL-B2-PM-GF-001
Electrical 1 Approval 1-Feb-2018 B w/ KHEP-SD-EL-B2-PM-FF-002
comments KHEP-SD-EL-B2-PM-RF-003
KHEP-SD-EL-B2-PM-GF-001
Revise &
Electrical 1 Approval 21-Feb-2018 C Resubmit
KHEP-SD-EL-B2-PM-FF-002
KHEP-SD-EL-B2-PM-RF-003
Revise &
Electrical 1 Approval 10-Feb-2018 C Resubmit
KHEP-SD-EL-A4-ER-GF-001
1356DF-SD-T-GN-001
1356DF-SD-T-DT-401
1356DF-SD-T-DT-402
1356DF-SD-T-DT-403
1356DF-SD-T-DT-404
1356DF-SD-T-DT-405
1356DF-SD-T-DT-406
1356DF-SD-T-DT-407
1356DF-SD-T-DT-408
Revise &
Low Current 1 Approval 15-Mar-2017 C Resubmit
1356DF-SD-T-DT-409
1356DF-SD-T-DT-410
1356DF-SD-T-DT-411
1356DF-SD-T-DT-412
1356DF-SD-T-DT-413
1356DF-SD-T-DT-414
1356DF-SD-T-DT-415
1356DF-SD-T-DT-416
1356DF-SD-T-DT-417
KHEP-SD-LC-TE-GN-001
KHEP-SD-LC-TE-DT-401
KHEP-SD-LC-TE-DT-402
KHEP-SD-LC-TE-DT-403
KHEP-SD-LC-TE-DT-404
KHEP-SD-LC-TE-DT-405
KHEP-SD-LC-TE-DT-406
KHEP-SD-LC-TE-DT-407
KHEP-SD-LC-TE-DT-408
Revise &
Low Current 1 Approval 4-Apr-2017 C Resubmit
KHEP-SD-LC-TE-DT-409
KHEP-SD-LC-TE-DT-410
KHEP-SD-LC-TE-DT-411
KHEP-SD-LC-TE-DT-412
KHEP-SD-LC-TE-DT-413
KHEP-SD-LC-TE-DT-414
KHEP-SD-LC-TE-DT-415
KHEP-SD-LC-TE-DT-416
KHEP-SD-LC-TE-DT-417
KHEP-SD-LC-TE-GN-001
KHEP-SD-LC-TE-DT-401
KHEP-SD-LC-TE-DT-402
KHEP-SD-LC-TE-DT-403
KHEP-SD-LC-TE-DT-404
KHEP-SD-LC-TE-DT-405
KHEP-SD-LC-TE-DT-406
KHEP-SD-LC-CC-DT-407
KHEP-SD-LC-TE-DT-408
Revise &
Low Current 1 Approval 25-May-2017 C Resubmit
KHEP-SD-LC-TE-DT-409
KHEP-SD-LC-TE-DT-410
KHEP-SD-LC-TE-DT-411
KHEP-SD-LC-TE-DT-412
KHEP-SD-LC-TE-DT-413
KHEP-SD-LC-TE-DT-414
KHEP-SD-LC-TE-DT-415
KHEP-SD-LC-TE-DT-416
KHEP-SD-LC-TE-DT-417
KHEP-SD-LC-TE-GN-001
KHEP-SD-LC-TE-DT-401
KHEP-SD-LC-TE-DT-402
KHEP-SD-LC-TE-DT-403
KHEP-SD-LC-TE-DT-404
KHEP-SD-LC-TE-DT-405
KHEP-SD-LC-TE-DT-406
KHEP-SD-LC-CC-DT-407
Approved KHEP-SD-LC-TE-DT-408
Low Current 1 Approval 18-Jul-2017 B w/ KHEP-SD-LC-TE-DT-409
Comments KHEP-SD-LC-TE-DT-410
KHEP-SD-LC-TE-DT-411
KHEP-SD-LC-TE-DT-412
KHEP-SD-LC-TE-DT-413
KHEP-SD-LC-TE-DT-414
KHEP-SD-LC-TE-DT-415
KHEP-SD-LC-TE-DT-416
KHEP-SD-LC-TE-DT-417
KHEP-SD-LC-TE-CO-100
KHEP-SD-LC-TE-CO-113
KHEP-SD-LC-TE-CO-114
KHEP-SD-LC-TE-CO-115
KHEP-SD-LC-TE-CO-116
KHEP-SD-LC-TE-CO-117
KHEP-SD-LC-TE-CO-118
KHEP-SD-LC-TE-CO-119
KHEP-SD-LC-TE-CO-120
KHEP-SD-LC-TE-CO-121
Revise & KHEP-SD-LC-TE-CO-122
Low Current 1 Approval 21-Mar-2017 C Resubmit KHEP-SD-LC-TE-CO-123
KHEP-SD-LC-TE-CO-124
KHEP-SD-LC-TE-CO-125
KHEP-SD-LC-TE-CO-126
KHEP-SD-LC-TE-CO-127
KHEP-SD-LC-TE-CO-128
KHEP-SD-LC-TE-CO-129
KHEP-SD-LC-TE-CO-130
KHEP-SD-LC-TE-CO-131
KHEP-SD-LC-TE-CO-132
KHEP-SD-LC-TE-CO-100
KHEP-SD-LC-TE-CO-113
KHEP-SD-LC-TE-CO-114
KHEP-SD-LC-TE-CO-115
KHEP-SD-LC-TE-CO-116
KHEP-SD-LC-TE-CO-117
KHEP-SD-LC-TE-CO-118
KHEP-SD-LC-TE-CO-119
KHEP-SD-LC-TE-CO-120
KHEP-SD-LC-TE-CO-121
Revise & KHEP-SD-LC-TE-CO-122
Low Current 1 Approval 25-May-2017 C Resubmit KHEP-SD-LC-TE-CO-123
KHEP-SD-LC-TE-CO-124
KHEP-SD-LC-TE-CO-125
KHEP-SD-LC-TE-CO-126
KHEP-SD-LC-TE-CO-127
KHEP-SD-LC-TE-CO-128
KHEP-SD-LC-TE-CO-129
KHEP-SD-LC-TE-CO-130
KHEP-SD-LC-TE-CO-131
KHEP-SD-LC-TE-CO-132
KHEP-SD-LC-TE-CO-100
KHEP-SD-LC-TE-CO-113
KHEP-SD-LC-TE-CO-114
KHEP-SD-LC-TE-CO-115
KHEP-SD-LC-TE-CO-116
KHEP-SD-LC-TE-CO-117
KHEP-SD-LC-TE-CO-118
KHEP-SD-LC-TE-CO-119
KHEP-SD-LC-TE-CO-120
KHEP-SD-LC-TE-CO-121
Approved
KHEP-SD-LC-TE-CO-122
Low Current 1 Approval 22-Jul-2017 B w/
KHEP-SD-LC-TE-CO-123
Comments
KHEP-SD-LC-TE-CO-124
KHEP-SD-LC-TE-CO-125
KHEP-SD-LC-TE-CO-126
KHEP-SD-LC-TE-CO-127
KHEP-SD-LC-TE-CO-128
KHEP-SD-LC-TE-CO-129
KHEP-SD-LC-TE-CO-130
KHEP-SD-LC-TE-CO-131
KHEP-SD-LC-TE-CO-132
KHEP-SD-LC-GN-000
KHEP-SD-LC-TE-CO-101
KHEP-SD-LC-TE-CO-102
KHEP-SD-LC-TE-CO-103
KHEP-SD-LC-TE-CO-104
KHEP-SD-LC-TE-CO-105
Revise & KHEP-SD-LC-TE-CO-106
Low Current 1 Approval 25-May-2017 C Resubmit KHEP-SD-LC-TE-CO-107
KHEP-SD-LC-TE-CO-108
KHEP-SD-LC-TE-CO-109
KHEP-SD-LC-TE-CO-110
KHEP-SD-LC-TE-CO-111
KHEP-SD-LC-TE-CO-112
KHEP-SD-LC-GN-000
KHEP-SD-LC-TE-CO-101
KHEP-SD-LC-TE-CO-102
KHEP-SD-LC-TE-CO-103
KHEP-SD-LC-TE-CO-104
Approved KHEP-SD-LC-TE-CO-105
Low Current 1 Approval 8-Jul-2017 B w/ KHEP-SD-LC-TE-CO-106
Comments KHEP-SD-LC-TE-CO-107
KHEP-SD-LC-TE-CO-108
KHEP-SD-LC-TE-CO-109
KHEP-SD-LC-TE-CO-110
KHEP-SD-LC-TE-CO-111
KHEP-SD-LC-TE-CO-112
KHEP-SD-LC-TE-CO-100
KHEP-SD-LC-TE-CO-101
KHEP-SD-LC-TE-CO-102
KHEP-SD-LC-TE-CO-103
KHEP-SD-LC-TE-CO-104
KHEP-SD-LC-TE-CO-105
Revise &
Low Current 1 Approval 2-Jan-2018 C Resubmit
KHEP-SD-LC-TE-CO-106
KHEP-SD-LC-TE-CO-107
KHEP-SD-LC-TE-CO-108
KHEP-SD-LC-TE-CO-109
KHEP-SD-LC-TE-CO-110
KHEP-SD-LC-TE-CO-111
KHEP-SD-LC-TE-CO-112
KHEP-SD-LC-TE-SC-501
KHEP-SD-LC-TE-SC-501a
KHEP-SD-LC-TE-SC-501b
KHEP-SD-LC-TE-SC-501c
KHEP-SD-LC-TE-SC-501d
Revise &
Low Current 1 Approval 25-May-2017 C Resubmit
KHEP-SD-LC-TE-SC-502
KHEP-SD-LC-CC-SC-503
KHEP-SD-LC-CC-SC-504
KHEP-SD-LC-TE-SC-505
KHEP-SD-LC-TE-SC-506
KHEP-SD-LC-TE-SC-501
KHEP-SD-LC-TE-SC-501a
KHEP-SD-LC-TE-SC-501b
KHEP-SD-LC-TE-SC-501c
KHEP-SD-LC-TE-SC-501d
Revise &
Low Current 1 Approval 23-Jul-2017 C Resubmit
KHEP-SD-LC-TE-SC-502
KHEP-SD-LC-CC-SC-503
KHEP-SD-LC-CC-SC-504
KHEP-SD-LC-TE-SC-505
KHEP-SD-LC-TE-SC-506
KHEP-SD-LC-TE-SC-501
KHEP-SD-LC-TE-SC-501a
KHEP-SD-LC-TE-SC-501b
KHEP-SD-LC-TE-SC-501c
Approved KHEP-SD-LC-TE-SC-501d
Low Current 1 Approval 7-Aug-2017 B w/ KHEP-SD-LC-TE-SC-502
Comments KHEP-SD-LC-CC-SC-503
KHEP-SD-LC-CC-SC-504
KHEP-SD-LC-TE-SC-505
KHEP-SD-LC-TE-SC-506
Approved
Low Current 1 Approval 9-Apr-2017 B w/ KHEP-SD-LC-CC-CO-100
Comments
HVAC
1356DF-SD-ME-HVAC-B2-FF-003
1356DF-SD-ME-HVAC-B2-FF-
004 1356DF-SD-ME-
Revise & HVAC-B2-GF-001 1356DF-
HVAC 1 Approval 4-Mar-2017 C Resubmit SD-ME-HVAC-B2-GF-002
1356DF-SD-ME-HVAC-B2-RF-005
1356DF-SD-ME-HVAC-B2-RF-
006
Approved KHEP-SD-ME-HVAC-B2-FF-003
HVAC 1 Approval 22-Mar-2017 B w/ KHEP-SD-ME-HVAC-B2-GF-001
comments KHEP-SD-ME-HVAC-B2-RF-005
KHEP-SD-ME-HVAC-B2-FF-003
Revise &
HVAC 1 Approval 13-Jul-2017 C Resubmit
KHEP-SD-ME-HVAC-B2-GF-001
KHEP-SD-ME-HVAC-B2-RF-005
KHEP-SD-ME-HVAC-B2-FF-003
Revise &
HVAC 1 Approval 1-Aug-2017 C Resubmit
KHEP-SD-ME-HVAC-B2-GF-001
KHEP-SD-ME-HVAC-B2-RF-005
Approved KHEP-SD-ME-HVAC-B2-FF-003
HVAC 1 Approval 10-Aug-2017 B w/ KHEP-SD-ME-HVAC-B2-GF-001
comments KHEP-SD-ME-HVAC-B2-RF-005
KHEP-SD-HVAC-A6-DW-GF-0001
Revise &
HVAC 1 Approval 8-Apr-2017 C Resubmit
KHEP-SD-HVAC-A6-DW-GF-0003
KHEP-SD-HVAC-BC6-PW- GF-0002
Revise & KHEP-SD-HVACBC6-PW- FF-0004
HVAC 1 Approval 15-Jun-2017 C Resubmit KHEP-SD-HVAC-BC6-PW- RF-0006
Approved
HVAC 1 Approval 4-May-2017 B w/ KHEP-SD-HVAC-A6-DW- GF-0005
comments
Approved
HVAC 1 Approval 19-Jul-2017 B w/ KHEP-SD-HVAC-A6-DW- GF-0005
comments
Revise &
HVAC 1 Approval 10-Aug-2017 C Resubmit
KHEP-SD-HVAC-A6-DW- GF-0005
KHEP-SD-HVAC- A4-DW-GF-0001
Revise &
HVAC 1 Approval 13-May-2017 C Resubmit
KHEP-SD-HVAC- A4-DW-FF-0003
KHEP-SD-HVAC- A4-DW-FF-0005
Approved KHEP-SD-HVAC- A4-DW-GF-0001
HVAC 1 Approval 6-Jun-2017 B w/ KHEP-SD-HVAC- A4-DW-FF-0003
comments KHEP-SD-HVAC- A4-DW-FF-0005
KHEP-SD-HVAC- A4-DW-GF-0001
Revise &
HVAC 1 Approval 13-Jul-2017 C Resubmit
KHEP-SD-HVAC- A4-DW-FF-0003
KHEP-SD-HVAC- A4-DW-FF-0006
KHEP-SD-HVAC- A4-DW-GF-0001
Revise &
HVAC 1 Approval 1-Aug-2017 C Resubmit
KHEP-SD-HVAC- A4-DW-FF-0003
KHEP-SD-HVAC- A4-DW-FF-0006
KHEP-SD-HVAC- A4-DW-GF-0001
HVAC 1 Approval 10-Aug-2017 A Approved KHEP-SD-HVAC- A4-DW-FF-0003
KHEP-SD-HVAC- A4-DW-FF-0006
HVAC 1 Approval 30-May-2017 A Approved KHEP-SD-HVAC-A4-RD-007
Revise &
HVAC 1 Approval 30-May-2017 C Resubmit
KHEP-SD-HVAC-A6-RD-007
Revise &
HVAC 1 Approval 15-Jun-2017 C Resubmit
KHEP-SD-HVAC-BC6-PW-RD-0008
Revise &
HVAC 1 Approval 15-Jun-2017 C Resubmit
KHEP-SD-HVAC-A6-PW-RD-0008
Revise &
HVAC 1 Approval 15-Jun-2017 C Resubmit
KHEP-SD-HVAC-B2-PW-RD-0008
Revise &
HVAC 1 Approval 17-Jun-2017 C Resubmit
KHEP-SD-HVAC-BC4-PW-RD-0008
KHEP-SD-HVAC- B2-PW-GF-002
Revise &
HVAC 1 Approval 15-Jun-2017 C Resubmit
KHEP-SD-HVAC- B2-PW-FF-004
KHEP-SD-HVAC- B2-PW-RF-006
Revise &
HVAC 1 Approval 7-Dec-2017 C Resubmit
KHEP-SD-HVAC-G-001
Revise &
HVAC 1 Approval 11-Jan-2018 C Resubmit
KHEP-SD-HVAC-G-001
Revise &
Mechanical 1 Approval 15-Aug-2017 C Resubmit
KHEP-SD-ME-B2-FP-RD-003
Revise &
Mechanical 1 Approval 29-May-2017 C Resubmit
KHEP-SD-ME-BC4-FP-RD-003
Revise &
Mechanical 1 Approval 15-Aug-2017 C Resubmit
KHEP-SD-ME-BC4-FP-RD-003
Revise &
Mechanical 1 Approval 29-May-2017 C Resubmit
KHEP-SD-ME-BC6-FP-RD-003
Revise &
Mechanical 1 Approval 15-Aug-2017 C Resubmit
KHEP-SD-ME-BC6-FP-RD-003
Revise &
Mechanical 1 Approval 29-May-2017 C Resubmit
KHEP-SD-ME-A4-FP-RD-003
Revise &
Mechanical 1 Approval 15-Aug-2017 C Resubmit
KHEP-SD-ME-A4-FP-RD-003
Revise &
Mechanical 1 Approval 29-May-2017 C Resubmit
KHEP-SD-ME-A6-FP-RD-003
Revise &
Mechanical 1 Approval 15-Aug-2017 C Resubmit
KHEP-SD-ME-A6-FP-RD-003
Approved
Mechanical 1 Approval 13-Nov-2017 B w/ KHEP-SD-ME-G-001
Comments
1356DF-SD-ME-DR-B2-GF-001
Revise &
Plumbing 1 Approval 27-Feb-2017 C Resubmit
1356DF-SD-ME-DR-B2-FF-002
1356DF-SD-ME-DR-B2-RF-003
Approved 1356DF-SD-ME-DR-B2-GF-001
Plumbing 1 Approval 1-Jun-2017 B w/ 1356DF-SD-ME-DR-B2-FF-002
Comments 1356DF-SD-ME-DR-B2-RF-003
1356DF-SD-ME-WS-B2-FF-002
Revise &
Plumbing 1 Approval 2-Mar-2017 C Resubmit
1356DF-SD-ME-WS-B2-GF-001
1356DF-SD-ME-WS-B2-RF-003
Approved KHEP-SD-PL-B2-WS-GF-0001
Plumbing 1 Approval 15-Mar-2017 B w/ KHEP-SD-PL-B2-WS-GF-0002 KHEP-
Comments SD-PL-B2-WS-GF-0003
Approved
KHEP-SD-PL-A6-DRG-GF-0001
Plumbing 1 Approval 4-Apr-2017 B w/
KHEP-SD-PL-A6-DRG-FF-0002
Comments
KHEP-SD-PL-WS-A6-GF-0001
Revise &
Plumbing 1 Approval 30-Apr-2017 C Resubmit
KHEP-SD-PL-WS-A6-FF-0002 KHEP-
SD-PL-WS-A6-RF-0003
Approved KHEP-SD-PL-WS-A6-GF-0001
Plumbing 1 Approval 30-May-2017 B w/ KHEP-SD-PL-WS-A6-FF-0002 KHEP-
Comments SD-PL-WS-A6-RF-0003
KHEP-SD-PL-BC4-WS-GF-001
Revise &
Plumbing 1 Approval 1-May-2017 C Resubmit
KHEP-SD-PL-BC4-WS-FF-002
KHEP-SD-PL-BC4-WS-RF-003
KHEP-SD-PL-BC4-WS-GF-001
Revise &
Plumbing 1 Approval 4-Jun-2017 C Resubmit
KHEP-SD-PL-BC4-WS-FF-002
KHEP-SD-PL-BC4-WS-RF-003
Approved KHEP-SD-PL-BC4-WS-GF-001
Plumbing 1 Approval 13-Jun-2017 B w/ KHEP-SD-PL-BC4-WS-FF-002
Comments KHEP-SD-PL-BC4-WS-RF-003
KHEP-SD-PL-BC4-DR-GF-001
Revise &
Plumbing 1 Approval 30-Apr-2017 C Resubmit
KHEP-SD-PL-BC4-DR-FF-002
KHEP-SD-PL-BC4-DR-RF-003
Approved KHEP-SD-PL-BC4-DR-GF-001
Plumbing 1 Approval 25-May-2017 B w/ KHEP-SD-PL-BC4-DR-FF-002
Comments KHEP-SD-PL-BC4-DR-RF-003
KHEP-SD-PL-BC6-DR- GF-0001
Revise &
Plumbing 1 Approval 10-May-2017 C Resubmit
KHEP-SD-PL-BC6-DR- FF-0002
KHEP-SD-PL-BC6-DR- RF-0003
Approved KHEP-SD-PL-BC6-DR- GF-0001
Plumbing 1 Approval 4-Jun-2017 B w/ KHEP-SD-PL-BC6-DR- FF-0002
Comments KHEP-SD-PL-BC6-DR- RF-0003
KHEP-SD-PL-BC6-WS- GF-0001
Revise &
Plumbing 1 Approval 10-May-2017 C Resubmit
KHEP-SD-PL-BC6-WS- FF-0002
KHEP-SD-PL-BC6-WS- RF-0003
Approved KHEP-SD-PL-BC6-WS- GF-0001
Plumbing 1 Approval 4-Jun-2017 B w/ KHEP-SD-PL-BC6-WS- FF-0002
Comments KHEP-SD-PL-BC6-WS- RF-0003
Revise &
Plumbing 1 Approval 9-May-2017 C Resubmit
KHEP-SD-PL-A6-DR- RF-0003
Approved
Plumbing 1 Approval 3-Jul-2017 B w/ KHEP-SD-PL-A6-DR- RF-0003
Comments
Approved KHEP-SD-PL-A4-DRG-GF-0001
Plumbing 1 Approval 15-May-2017 B w/ KHEP-SD-PL-A4-DRG-GF-0002
Comments KHEP-SD-PL-A4-DRG-GF-0003
KHEP-SD-PL-A4-WS-GF-0001
Revise &
Plumbing 1 Approval 15-May-2017 C Resubmit
KHEP-SD-PL-A4-WS-FF-0002
KHEP-SD-PL-A4-WS-RF-0003
Approved KHEP-SD-PL-A4-WS-GF-0001
Plumbing 1 Approval 30-May-2017 B w/ KHEP-SD-PL-A4-WS-FF-0002
Comments KHEP-SD-PL-A4-WS-RF-0003
Approved
Plumbing 1 Approval 30-May-2017 B w/ KHEP-SD-PL-A4-WS- RD-0004
Comments
Approved
Plumbing 1 Approval 30-May-2017 B w/ KHEP-SD-PL-A6-WS- RD-0004
Comments
Approved
Plumbing 1 Approval 30-May-2017 B w/ KHEP-SD-PL-B2-WS- RD-0004
Comments
Approved
Plumbing 1 Approval 30-May-2017 B w/ KHEP-SD-PL-BC4-WS- RD-0004
Comments
Approved
Plumbing 1 Approval 30-May-2017 B w/ KHEP-SD-PL-BC6-WS- RD-0004
Comments
Revise &
Plumbing 1 Approval 30-May-2017 C Resubmit
KHEP-SD-PL-A4-DRG- RD-0004
Revise &
Plumbing 1 Approval 10-Jun-2017 C Resubmit
KHEP-SD-PL-A4-DRG- RD-0004
Approved
Plumbing 1 Approval 14-Jun-2017 B w/ KHEP-SD-PL-A4-DRG- RD-0004
Comments
Revise &
Plumbing 1 Approval 30-May-2017 C Resubmit
KHEP-SD-PL-A6-DRG- RD-0004
Revise &
Plumbing 1 Approval 10-Jun-2017 C Resubmit
KHEP-SD-PL-A6-DRG- RD-0004
Approved
Plumbing 1 Approval 14-Jun-2017 B w/ KHEP-SD-PL-A6-DRG- RD-0004
Comments
Revise &
Plumbing 1 Approval 30-May-2017 C Resubmit
KHEP-SD-PL-B2-DRG- RD-0004
Revise &
Plumbing 1 Approval 10-Jun-2017 C Resubmit
KHEP-SD-PL-B2-DRG- RD-0004
Approved
Plumbing 1 Approval 14-Jun-2017 B w/ KHEP-SD-PL-B2-DRG- RD-0004
Comments
Revise &
Plumbing 1 Approval 30-May-2017 C Resubmit
KHEP-SD-PL-BC4-DRG- RD-0004
Revise &
Plumbing 1 Approval 10-Jun-2017 C Resubmit
KHEP-SD-PL-BC4-DRG- RD-0004
Approved
Plumbing 1 Approval 14-Jun-2017 B w/ KHEP-SD-PL-BC4-DRG- RD-0004
Comments
Revise &
Plumbing 1 Approval 30-May-2017 C Resubmit
KHEP-SD-PL-BC6-DRG- RD-0004
Revise &
Plumbing 1 Approval 10-Jun-2017 C Resubmit
KHEP-SD-PL-BC6-DRG- RD-0004
Approved
Plumbing 1 Approval 14-Jun-2017 B w/ KHEP-SD-PL-BC6-DRG- RD-0004
Comments
Revise &
Plumbing 1 Approval 26-Oct-2017 C Resubmit
KHEP-SD-PL-G-001
Revise &
Plumbing 1 Approval 7-Dec-2017 C Resubmit
KHEP-SD-PL-G-001
Revise &
Plumbing 1 Approval 10-Jan-2018 C Resubmit
KHEP-SD-PL-G-001
1356DF-S-B2-GA-FD-001
Approved
1356DF-S-B2-GA-FD-SEC-002 1356DF-
Structural 1 Approval 16-Feb-2017 B w/
B2-A6-RP-FD-501 1356DF-S-
Comments
B2-RS-FD-502
1356DF-SD-ST-B2-GA-GF-003
1356DF-SD-ST-B2-GF-SEC-004 1356DF-
Revise &
Structural 1 Approval 27-Feb-2017 C Resubmit
SD-ST-B2-RP-GF-503 1356DF-SD-ST-B2-
GA-ST-010 1356DF-SD-ST-B2-RF-ST-510
KHEP-SD-ST-B2-GA-GF-003
Approved KHEP-SD-ST-B2-GF-SEC-004
Structural 1 Approval 29-Mar-2017 B w/ KHEP-SD-ST-B2--RP-GF-013
Comments KHEP-SD-ST-B2-GA-ST-010
KHEP-SD-ST-B2-RS-ST-019
Approved
KHEP-SD-ST-B2-GA-GF-003
Structural 1 Approval 20-May-2017 B w/
KHEP-SD-ST-B2-GF-SEC-004
Comments
KHEP-SD-B2-GA-GF-003
Structural 1 Approval 25-Dec-2017 A Approved KHEP-SD-B2-GF-SEC-004
KHEP-SD-B2-RP-GF-0013
Revise & 1356DF-SD-ST-A6-BR-GF-510 1356DF-
Structural 1 Approval 27-Feb-2017 C Resubmit SD-ST-A6-BR-GF-510A
Revise & KHEP-SD-ST-A6-BR-GF-019
Structural 1 Approval 30-Mar-2017 C Resubmit KHEP-SD-ST-A6-BR-GF-019A
KHEP-SD-ST-A6-BR-GF-019
Approved
KHEP-SD-ST-A6-BR-GF-019A
Structural 1 Approval 17-Apr-2017 B w/
KHEP-SD-ST-A6-BR-GF-019B
Comments
KHEP-SD-ST-A6-BR-GF-019C
Revise & KHEP-SD-ST-B2-BR-GF-020
Structural 1 Approval 1-Apr-2017 C Resubmit KHEP-SD-ST-B2-BR-GF-020A
Approved
KHEP-SD-ST-B2-BR-GF-020
Structural 1 Approval 10-Apr-2017 B w/
KHEP-SD-ST-B2-BR-GF-020A
Comments
KHEP-SD-ST-B2-GA-FF-005
Approved
KHEP-SD-ST-B2-SEC-FF-006
Structural 1 Approval 19-Mar-2017 B w/
KHEP-SD-ST-B2-RP-FF-014
Comments
KHEP-SD-ST-B2-RP-FF-015
KHEP-SD-ST-B2-GA-FF-005
KHEP-SD-ST-B2-SEC-FF-006
KHEP-SD-ST-B2-RP-FF-014
KHEP-SD-ST-B2-RP-FF-015
Approved
Resubmit
Structural 1 Approval 10-May-2017 B w/
KHEP-SD-ST-B2-GA-FF-005
Comments
KHEP-SD-ST-B2-SEC-FF-006
KHEP-SD-ST-B2-RP-FF-014
KHEP-SD-ST-B2-RP-FF-015
KHEP-SD-ST-B2-RP-FF-015A
KHEP-SD-ST-B2-GA-FF-005
Approved KHEP-SD-ST-B2-SEC-FF-006
Structural 1 Approval 20-Nov-2017 B w/ KHEP-SD-ST-B2-RP-FF-014
Comments KHEP-SD-ST-B2-RP-FF-015
KHEP-SD-ST-B2-RP-FF-015A
1356DF-S-A6-GA-FD-001
Approved
1356DF-S-A6-GA-SEC-002 1356DF-
Structural 1 Approval 9-Feb-2017 B w/
S-A6-RP-FD-501 1356DF-S-A6-
Comments
RS-FD-502
Approved
1356DF-S-A6-GA-GF-003
Structural 1 Approval 13-Feb-2017 B w/
1356DF-S-A6-RPS-GF-503
Comments
KHEP-SD-ST-A6-GA-GF-003
Structural 1 Approval 25-Dec-2017 A Approved
KHEP-SD-ST-A6-RP-GF-0012
KHEP-SD-ST-A6-R-CW1-GA-008 TO 008N
Revise &
Structural 1 Approval 23-Mar-2017 C Resubmit
KHEP-
SD-ST-A6-R-CW1-017 TO 017N
Approved
Structural 1 Approval 18-Apr-2017 B w/ KHEP-SD-ST-A6-R-CW1-017 TO017N
Comments
Structural 1 Approval 11-Jun-2017 A Approved KHEP-SD-ST-A6-R-CW1-017 TO017N
KHEP-SD-ST-B2-CW1-GA-009 TO 009K
Revise &
Structural 1 Approval 23-Mar-2017 C Resubmit
KHEP-
SD-ST-B2-R-CW1-018 TO 018K
Approved
Structural 1 Approval 12-Apr-2017 B w/ KHEP-SD-ST-B2-R-CW1-018 TO 018K
Comments
Structural 1 Approval 15-Jun-2017 A Approved KHEP-SD-ST-B2-R-CW1-018 TO 018K
Revise &
Structural 1 Approval 25-Oct-2017 C Resubmit
KHEP-SD-ST-B2-R-CW5-018K
Approved
Structural 1 Approval 12-Nov-2017 B w/ KHEP-SD-ST-B2-R-CW5-018K
Comments
Revise &
Structural 1 Approval 29-Mar-2017 C Resubmit
KHEP-SD-ST-A6-FF-BR-021
KHEP-SD-ST-A6-FF-BR-021
Revise & KHEP-SD-ST-A6-FF-BR-022
Structural 1 Approval 1-Jun-2017 C Resubmit KHEP-SD-ST-A6-FF-BR-023
KHEP-SD-ST-A6-FF-BR-021
KHEP-SD-ST-A6-FF-BR-022
Structural 1 Approval 8-Jun-2017 A Approved
KHEP-SD-ST-A6-FF-BR-023
KHEP-SD-ST-A6-GA-FF-004
Revise &
Structural 1 Approval 29-Mar-2017 C Resubmit
KHEP-SD-ST-A6-RS-FF-013
KHEP-SD-ST-A6-RP-FF-014
Approved KHEP-SD-ST-A6-GA-FF-004
Structural 1 Approval 8-Jun-2017 B w/ KHEP-SD-ST-A6-RS-FF-013
Comments KHEP-SD-ST-A6-RP-FF-014
Revise &
Structural 1 Approval 30-Mar-2017 C Resubmit
KHEP-SD-ST-B2-BR-FF-021
Approved
Structural 1 Approval 6-May-2017 B w/ KHEP-SD-ST-B2-BR-FF-021
Comments
KHEP-SD-ST-BC4-GA-FD-001
KHEP-SD-ST-BC4-SEC-FD-002
Revise &
Structural 1 Approval 10-Apr-2017 C Resubmit
KHEP-SD-ST-BC4-RP-FD-001
KHEP-SD-ST-BC4-RS-FD-002
KHEP-SD-ST-BC4-GA-FD-001
Revise & KHEP-SD-ST-BC4-SEC-FD-002
Structural 1 Approval 22-Apr-2017 C Resubmit KHEP-SD-ST-BC4-RP-FD-001
KHEP-SD-ST-BC4-RS-FD-002
KHEP-SD-ST-BC4-GA-FD-001
KHEP-SD-ST-BC4-SEC-FD-002
Structural 1 Approval 26-Apr-2017 A Approved
KHEP-SD-ST-BC4-RP-FD-001
KHEP-SD-ST-BC4-RS-FD-002
KHEP-SD-ST-BC6-GA-FD-001
KHEP-SD-ST-BC6-SEC-FD-002
Revise &
Structural 1 Approval 12-Apr-2017 C Resubmit
KHEP-SD-ST-BC6-RP-FD-011
KHEP-SD-ST-BC6-RS-FD-012
KHEP-SD-ST-BC6-GA-FD-001
Approved
KHEP-SD-ST-BC6-SEC-FD-002
Structural 1 Approval 23-Apr-2017 B w/
KHEP-SD-ST-BC6-RP-FD-011
Comments
KHEP-SD-ST-BC6-RS-FD-012
KHEP-SD-ST-A4-GA-FD-001
Revise & KHEP-SD-ST-A4-SEC-FD-002
Structural 1 Approval 13-Apr-2017 C Resubmit KHEP-SD-ST-A4-RP-FD-011 KHEP-
SD-ST-A4-RS-FD-012
KHEP-SD-ST-A4-GA-FD-001
Revise & KHEP-SD-ST-A4-SEC-FD-002
Structural 1 Approval 7-May-2017 C Resubmit KHEP-SD-ST-A4-RP-FD-011 KHEP-
SD-ST-A4-RS-FD-012
KHEP-SD-ST-A4-GA-FD-001
Approved
KHEP-SD-ST-A4-SEC-FD-002
Structural 1 Approval 25-May-2017 B w/
KHEP-SD-ST-A4-RP-FD-011
Comments
KHEP-SD-ST-A4-R9-FD-012
KHEP-SD-ST-BC4-GA-GF-003
Approved
KHEP-SD-ST-BC4-SEC-GF-004
Structural 1 Approval 4-May-2017 B w/
KHEP-SD-ST-BC4-RP-GF-013
Comments
KHEP-SD-ST-BC4-RS-GF-014
KHEP-SD-ST-BC4-GA-GF-003
Approved KHEP-SD-ST-BC4-SEC-GF-004
Structural 1 Approval 4-Jun-2017 B w/ KHEP-SD-ST-BC4-RP-GF-013
Comments KHEP-SD-ST-BC4-RS-GF-014
KHEP-SD-ST-BC4-GA-GF-003
KHEP-SD-ST-BC4-SEC-GF-004
Structural 1 Approval 27-Jul-2017 A Approved KHEP-SD-ST-BC4-RP-GF-013
KHEP-SD-ST-BC4-RS-GF-014
KHEP-SD-ST-BC4-GA-GF-003
KHEP-SD-ST-BC4-SEC-GF-004
Revise &
Structural 1 Approval 1-Jan-2018 C Resubmit
KHEP-SD-ST-BC4-RP-GF-013
KHEP-SD-ST-BC4-RS-GF-014
Revise &
Structural 1 Approval 23-May-2017 C Resubmit
KHEP-SD-ST-BC4-R-CW1-019 TO 019I
Approved
Structural 1 Approval 7-Nov-2017 B w/ KHEP-SD-ST-BC4-R-CW5-019H
Comments
Approved
Structural 1 Approval 14-May-2017 B w/ KHEP-SD-ST-BC6-R-CW1-019 TO 019I
Comments
Approved
Structural 1 Approval 7-Nov-2017 B w/ KHEP-SD-ST-BC6-R-CW5-019H
Comments
KHEP-SD-ST-BC4-GA-RF-006
Approved KHEP-SD-ST-BC4-RP-RS-017
Structural 1 Approval 25-May-2017 B w/ KHEP-SD-ST-BC4-RP-RS-018
Comments KHEP-SD-ST-BC4-RP-RS-018A
KHEP-SD-ST-A4-GA-RF-006
Approved
KHEP-SD-ST-A4-RP-RS-017
Structural 1 Approval 25-May-2017 B w/
KHEP-SD-ST-A4-RP-RS-018
Comments
KHEP-SD-ST-A4-RP-RS-018A
KHEP-SD-ST-A4-GA-RF-006
Revise & KHEP-SD-ST-A4-RP-RS-017
Structural 1 Approval 19-Feb-2018 C Resubmit KHEP-SD-ST-A4-RP-RS-018
KHEP-SD-ST-A4-RP-RS-018A
Approved KHEP-SD-ST-A6-GA-RF-006
Structural 1 Approval 25-May-2017 B w/ KHEP-SD-ST-A6-RP-RF-015
Comments KHEP-SD-ST-A6-RP-RF-016
KHEP-SD-ST-A6-GA-RF-006
Structural 1 Approval KHEP-SD-ST-A6-RP-RF-015
KHEP-SD-ST-A6-RP-RF-016
Revise &
Structural 1 Approval 23-May-2017 C Resubmit
KHEP-SD-ST-A4-R-CW1-019 TO 019L
KHEP-SD-ST-B2-GA-RF-007
Approved KHEP-SD-ST-B2-SEC-RF-008
Structural 1 Approval 7-Jun-2017 B w/ KHEP-SD-ST-B2-RP-RF-016
Comments KHEP-SD-ST-B2-RS-RF-017
KHEP-SD-ST-B2-RS-RF-017A
KHEP-SD-ST-B2-GA-RF-007
KHEP-SD-ST-B2-SEC-RF-008
Revise &
Structural 1 Approval 26-Oct-2017 C Resubmit
KHEP-SD-ST-B2-RP-RF-016
KHEP-SD-ST-B2-RS-RF-017
KHEP-SD-ST-B2-RS-RF-017A
KHEP-SD-ST-B2-GA-RF-007
KHEP-SD-ST-B2-SEC-RF-008
Revise &
Structural 1 Approval 22-Nov-2017 C Resubmit
KHEP-SD-ST-B2-RP-RF-016
KHEP-SD-ST-B2-RS-RF-017
KHEP-SD-ST-B2-RS-RF-017A
Revise &
Structural 1 Approval 24-May-2017 C Resubmit
KHEP-SD-ST-B2-RF-BR-023
Approved
Structural 1 Approval .. B w/ KHEP-SD-ST-B2-RF-BR-023
Comments
Approved
KHEP-SD-ST-BC6-FF-BR-022
Structural 1 Approval 25-May-2017 B w/
KHEP-SD-ST-BC6-FF-BR-022A
Comments
KHEP-SD-ST-BC6-GA-GF-003
Revise &
Structural 1 Approval 13-Jun-2017 C Resubmit
KHEP-SD-ST-BC6-RP-GF-013
Approved KHEP-SD-ST-BC6-GA-GF-003
Structural 1 Approval 20-Jul-2017 B w/ KHEP-SD-ST-BC6-RP-GF-013
Comments
KHEP-SD-ST-BC6-GA-GF-003
Revise &
Structural 1 Approval 1-Jan-2018 C Resubmit
KHEP-SD-ST-BC6-RP-GF-013
KHEP-SD-ST-BC6-GA-ST-010
Revise &
Structural 1 Approval 4-Jun-2017 C Resubmit
KHEP-SD-ST-BC6-ST-RS-020
KHEP-SD-ST-BC6-GA-ST-010
Structural 1 Approval 13-Jun-2017 A Approved KHEP-SD-ST-BC6-ST-RS-020
Approved KHEP-SD-ST-A4-GA-ST-010
Structural 1 Approval 4-Jun-2017 B w/ KHEP-SD-ST-A4-ST-RS-020
Comments
KHEP-SD-ST-A4-GA-GF-003
Structural 1 Approval 5-Jul-2017 A Approved
KHEP-SD-ST-A4-RP-GF-013
Approved KHEP-SD-ST-BC4-GF-BR-021
Structural 1 Approval 19-Jun-2017 B w/ KHEP-SD-ST-BC4-GF-BR-021A
Comments
Approved KHEP-SD-ST-A4-GF-BR-021
Structural 1 Approval 19-Jun-2017 B w/ KHEP-SD-ST-A4-GF-BR-021A
Comments
Approved KHEP-SD-ST-BC6-GF-BR-021
Structural 1 Approval 4-Jul-2017 B w/ KHEP-SD-ST-BC6-GF-BR-021A
Comments
KHEP-SD-ST-AB-GA-FD-001
Structural 1 Approval 10-Jul-2017 A Approved KHEP-SD-ST-AB-RP-FD-004
KHEP-SD-ST-PT-GA-FD-001
KHEP-SD-ST-PT-RP-FD-004 KHEP-SD-ST-
Structural 1 Approval 12-Aug-2017 A Approved
PT-R-C-004
KHEP-SD-ST-PTA-GA-FD-001
KHEP-SD-ST-PTA-RP-FD-004
Structural 1 Approval 7-Aug-2017 E Rejected
KHEP-SD-ST-PTA-R-C-007
KHEP-SD-ST-PTA-GA-FD-001
Revise & KHEP-SD-ST-PTA-RP-FD-004
Structural 1 Approval 8-Nov-2017 C Resubmit KHEP-SD-ST-PTA-R-C-007
KHEP-SD-ST-PTA-GA-FD-001
Approved
KHEP-SD-ST-PTA-RP-FD-004
Structural 1 Approval 28-Nov-2017 B w/
KHEP-SD-ST-PTA-R-C-007
Comments
Approved
Structural 1 Approval 31-Jul-2017 B w/ KHEP-SD-ST-PT-R-C-007
Comments
KHEP-SD-ST-AB-GA-RF-003
Revise &
Structural 1 Approval 21-Sep-2017 C Resubmit
KHEP-SD-ST-AB-RP-RF-006
KHEP-SD-ST-A6-RF-BR-024
Revise & KHEP-SD-ST-A6-RF-BR-025
Structural 1 Approval 22-Jul-2017 C Resubmit KHEP-SD-ST-A6-RF-BR-026
KHEP-SD-ST-A6-RF-BR-024
Revise & KHEP-SD-ST-A6-RF-BR-025
Structural 1 Approval 10-Aug-2017 C Resubmit KHEP-SD-ST-A6-RF-BR-026
KHEP-SD-ST-A6-RF-BR-024
Revise & KHEP-SD-ST-A6-RF-BR-025
Structural 1 Approval 24-Aug-2017 C Resubmit KHEP-SD-ST-A6-RF-BR-026
KHEP-SD-ST-A6-RF-BR-024
Approved
KHEP-SD-ST-A6-RF-BR-025
Structural 1 Approval 12-Sep-2017 B w/
KHEP-SD-ST-A6-RF-BR-026
Comments
Revise & KHEP-SD-ST-PT-GA-RF-003
Structural 1 Approval 7-Aug-2017 C Resubmit KHEP-SD-ST-PT-RP-RF-006
Approved
Structural 1 Approval 7-Aug-2017 B w/ KHEP-SD-ST-PT-BR-RF-009
Comments
KHEP-SD-ST-AB-GA-GF-002
Revise &
Structural 1 Approval 1-Aug-2017 C Resubmit
KHEP-SD-ST-AB-RP-GF-005
Approved
Structural 1 Approval 31-Jul-2017 B w/ KHEP-SD-ST-AB-GF-BR-008
Comments
KHEP-SD-ST-BC4-GA-FF-005
KHEP-SD-ST-BC4-RP-FF-015
Revise &
Structural 1 Approval 2-Aug-2017 C Resubmit
KHEP-SD-ST-BC4-RP-FF-016
KHEP-SD-ST-BC4-RS-FF-016A
KHEP-SD-ST-BC4-GA-FF-005
KHEP-SD-ST-BC4-RP-FF-015
Revise &
Structural 1 Approval 3-Oct-2017 C Resubmit
KHEP-SD-ST-BC4-RP-FF-016
KHEP-SD-ST-BC4-RS-FF-016A
KHEP-SD-ST-BC4-GA-FF-005
KHEP-SD-ST-BC4-RP-FF-015
Structural 1 Approval 15-Oct-2017 A Approved KHEP-SD-ST-BC4-RP-FF-016
KHEP-SD-ST-BC4-RS-FF-016A
Approved KHEP-SD-ST-BC4-FF-BR-022
Structural 1 Approval 2-Aug-2017 B w/ KHEP-SD-ST-BC4-FF-BR-022A
Comments
KHEP-SD-ST-PTA-GA-GF-002
Revise &
Structural 1 Approval 10-Aug-2017 C Resubmit
KHEP-SD-ST-PTA-RP-GF-005
KHEP-SD-ST-PT-GA-GF-002
Structural 1 Approval 9-Aug-2017 A Approved KHEP-SD-ST-PT-RP-GF-005
Revise &
Structural 1 Approval 9-Aug-2017 C Resubmit
KHEP-SD-ST-PT-GF-BR-008
KHEP-SD-ST-BC6-GA-FF-004
Revise & KHEP-SD-ST-BC6-RS-FF-014
Structural 1 Approval 7-Aug-2017 C Resubmit KHEP-SD-ST-BC6-RP-FF-015
KHEP-SD-ST-BC6-GA-FF-004
KHEP-SD-ST-BC6-RS-FF-014
Structural 1 Approval 24-Oct-2017 A Approved
KHEP-SD-ST-BC6-RP-FF-015
Approved KHEP-SD-ST-PTA-GA-RF-003
Structural 1 Approval 10-Aug-2017 B w/ KHEP-SD-ST-PTA-RP-RF-006
Comments
KHEP-SD-ST-A4-GA-FF-004
KHEP-SD-ST-A4-SEC-FF-005
Revise & KHEP-SD-ST-A4-RP-FF-014
Structural 1 Approval 7-Aug-2017 C Resubmit KHEP-SD-ST-A4-RP-FF-015
KHEP-SD-ST-A4-RS-FF-016
KHEP-SD-ST-A4-GA-FF-004
KHEP-SD-ST-A4-SEC-FF-005
Approved
KHEP-SD-ST-A4-RP-FF-014
Structural 1 Approval 15-Oct-2017 B w/
KHEP-SD-ST-A4-RP-FF-015
Comments
KHEP-SD-ST-A4-RS-FF-016
KHEP-SD-ST-A4-FF-BR-022
Revise & KHEP-SD-ST-A4-FF-BR-022A
Structural 1 Approval 15-Aug-2017 C Resubmit KHEP-SD-ST-A4-FF-BR-022B
KHEP-SD-ST-A4-FF-BR-022
KHEP-SD-ST-A4-FF-BR-022A
Structural 1 Approval 24-Oct-2017 A Approved
KHEP-SD-ST-A4-FF-BR-022B
Revise &
Structural 1 Approval 3-Oct-2017 C Resubmit
KHEP-SD-ST-BC4-RF-BR-023
Approved
Structural 1 Approval 22-Jan-2018 B w/ KHEP-SD-ST-BC4-RF-BR-023
Comments
Approved
Structural 1 Approval 20-Feb-2018 B w/ KHEP-SD-ST-BC4-RF-BR-023
Comments
KHEP-SD-ST-A4-RF-BR-023
Revise &
Structural 1 Approval 10-Oct-2017 C Resubmit
KHEP-SD-ST-A4-RF-BR-024
Revise &
Structural 1 Approval 15-Oct-2017 C Resubmit
KHEP-SD-ST-BC6-RF-BR-023
KHEP-SD-ST-BC6-GA-RF-005
Structural 1 Approval KHEP-SD-ST-BC6-GA-RF-016
KHEP-SD-ST-BC6-GA-RF-017
KHEP-SD-CO-A4-GF-001
Other 1 Approval 23-Jul-2017 E Rejected
KHEP-SD-CO-A4-FF-001
Revise & KHEP-SD-CO-A4-GF-001
Other 1 Approval 30-Aug-2017 C Resubmit KHEP-SD-CO-A4-FF-001
KHEP-SD-CO-A6-GF-001 KHEP-
Other 1 Approval 23-Jul-2017 E Rejected
SD-CO-A6-FF-001
Revise & KHEP-SD-CO-A6-GF-001 KHEP-
Other 1 Approval 30-Aug-2017 C Resubmit SD-CO-A6-FF-001
KHEP-SD-CO-B2-GF-001 KHEP-
Other 1 Approval 23-Jul-2017 E Rejected
SD-CO-B2-FF-001
Revise & KHEP-SD-CO-B2-GF-001 KHEP-
Other 1 Approval 30-Aug-2017 C Resubmit SD-CO-B2-FF-001
KHEP-SD-CO-BC4-GF-001 KHEP-SD-
Other 1 Approval 23-Jul-2017 E Rejected
CO-BC4-FF-001
Revise & KHEP-SD-CO-BC4-GF-001 KHEP-SD-
Other 1 Approval 30-Aug-2017 C Resubmit CO-BC4-FF-001
KHEP-SD-CO-BC6-GF-001 KHEP-SD-
Other 1 Approval 23-Jul-2017 E Rejected
CO-BC6-FF-001
Revise & KHEP-SD-CO-BC6-GF-001 KHEP-SD-
Other 1 Approval 30-Aug-2017 C Resubmit CO-BC6-FF-001
REMARKS COMMENTS
Closed
Closed
Closed
Closed
Closed
Closed
Open
Closed
Closed
Closed
Closed
Open
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Open
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Open
Closed
Closed
Closed
Closed
Closed
Closed
Open
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Open
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Open
Closed
Open
Closed
Open
Closed
Open
Closed
Open
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Open
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Open
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
SR NO REQUEST FOR CLARIFICATION NO. ACTIVITIES / INSPECTION ITEMS SUBMITTED DATE
ARCHITECTURAL
Door Type Conflict between Door Schedule and Floor
0001 KHEP-RFC-AR-0001-00 19-Feb-2017
Plan drawing in all Cluster
0002 KHEP-RFC-AR-0002-00 Cluster A4 & A6 Stair Steps Modification 26-Feb-2017
0003 KHEP-RFC-AR-0003-00 Cluster A4 & A6 Column Modification 27-Feb-2017
0005 KHEP-RFC-AR-0005-00 Waterproofing & Floor Finishing at Balcony in all Clusters 7-Mar-2017
0005.1 KHEP-RFC-AR-0005-01 Waterproofing & Floor Finishing at Balcony in all Clusters 10-Aug-2017
0006 KHEP-RFC-AR-0006-00 Replacing Wall Type from EW-10 to EW-7 in all clusters 8-Feb-2017
0012 KHEP-RFC-AR-0012-00 Ceiling clashes with doors & windows for cluster A4 & A6 23-Apr-2017
0012.1 KHEP-RFC-AR-0012-01 Ceiling clashes with doors & windows for cluster A4 & A6 14-May-2017
0012.2 KHEP-RFC-AR-0012-02 Ceiling clashes with doors & windows for cluster A4 & A6 6-Jun-2017
0015 KHEP-RFC-AR-0015-00 Wet Area Waterproofing System for All Clusters 23-May-2017
0016.1 KHEP-RFC-AR-0016-01 Backyard Galvanized Steel Gate for All Cluster 16-Nov-2017
0019 KHEP-RFC-AR-0019-00 Public Toilets & Ancillary Building Roof Slab Thickness 9-Jul-2017
0020 KHEP-RFC-AR-0020-00 Clash Between Drainage Pipes and Kitchen Wall 24-Jul-2017
0024 KHEP-RFC-AR-0024-00 Proposal to Change the Layers of wall type 7 - General 21-Sep-2017
0026 KHEP-RFC-AR-0026-00 Balcony Water proofing System for All Clusters 11-Oct-2017
0028 KHEP-RFC-AR-0028-00 Reinforcing Bars Spacing & Grout Filling for Block Works 13-Nov-2017
0030 KHEP-RFC-AR-0030-00 Green Color Paint at Family & Living Area 20-Nov-2017
0045 KHEP-RFC-AR-0045-00 Public Toilets Pedestal Wall for Water Closet Flush Tank 24-Jan-2018
CIVIL
0001 KHEP-RFC-33-0001-00 Request for Clarificationf of Sewer System 15-Jan-2017
0023 KHEP-RFC-CI-0023-00 Working Pressure for potable & Fire Fighting Network 4-Jul-2017
ELECTRICAL
0001 KHEP-RFC-EL-0001-00 Cluster A6 Grounding system 14-Feb-2017
0002 KHEP-RFC-EL-0002-00 Fire Alarm System Interface with HVAC System 19-Feb-2017
0003 KHEP-RFC-EL-0003-00 Fire Alarm System Interface with HVAC System 19-Feb-2017
0003.1 KHEP-RFC-EL-0003-01 Telecom Service Manhole - Type 21-Feb-2017
0004 KHEP-RFC-EL-0004-00 B2- GF Floor-Earthing Of Communication System 28-Feb-2017
0033 KHEP-RFC-EL-0033-00 Industrial in the utility room for telecom cabinet 27-Sep-2017
0056 KHEP-RFC-EL-0056-00 PVC EMT Conduit Transition for 300mm High Outlets 1-Jan-2018
0060.1 KHEP-RFC-EL-0060-01 Change Feeder Source of the Street Lighting Panel 1-Feb-2018
HVAC
0001 KHEP-RFC-HVAC-0001-00
MECHANICAL
0001 KHEP-RFC-ME-0001-00 Sleeve Pipe 23-Mar-2017
Change of material specification for external water
0002 KHEP-RFC-33-0002-00 22-Jan-2017
distribution piping
0008 KHEP-RFC-ME-0008-00 New Location of of Floor Drain to Avoid Grade Beam 16-Mar-2017
0015 KHEP-RFC-ME-0015-00 A6 & A4-Fire Protection pipe for closet room 10-Apr-2017
0029 KHEP-RFC-ME-0029-00 Relocation of Vent Pipe Connection for Water Closet 4-Jan-2018
0036 KHEP-RFC-ME-0036-00 Cancellation of Secondry Drain Pan of Fan Cion Unit 26-Feb-2018
STRUCTURAL
0001 KHEP-RFC-ST-0001-00 B2-Roof-Missing Beam Number 19-Mar-2017
0002 KHEP-RFC-ST-0002-00 B2-Roof-Beam Discrepancy 19-Mar-2017
0023 KHEP-RFC-ST-0023-00 Proposed Detail of Concrete Coping for parapet Walls 28-Sep-2017
0025 KHEP-RFC-ST-0025-00 Cluster B2, BC4 & BC6 New Shaft Openings 10-Oct-2017
0027 KHEP-RFC-ST-0027-00 Cluster A4 & A6 Roof Floor Cantilever Beam Location 11-Oct-2017
0029 KHEP-RFC-ST-0029-00 Clusters B2, BC4 & BC6 Wall W5 Discrepancy 26-Oct-2017
0033 KHEP-RFC-ST-0033-00 All Cluster Proposed Roof Shafts Cover Slab Details 20-Dec-2017
B Approved w/ Comments
E Rejected
SUBMITTED FOR RESPONDED AS
DISCIPLINE DATE RESPONDED INTERNEL REFERENCE NO
CODE STATUS CODE STATUS
Approved w/
Architectural 1 Approval 5-Mar-2017 B comments
KHEP-RFC-AR-0001-00
Approved w/
Architectural 1 Approval 21-Sep-2017 B comments
KHEP-RFC-AR-0005-01
Approved w/
Architectural 1 Approval 20-Feb-2017 B comments
KHEP-RFC-AR-0007-00
Approved w/
Architectural 1 Approval 26-Mar-2017 B comments
KHEP-RFC-AR-0008-00
Approved w/
Architectural 1 Approval 12-Jul-2017 B comments
KHEP-RFC-AR-0019-00
Approved w/
Architectural 1 Approval 27-Jul-2017 B comments
KHEP-RFC-AR-0020-00
Approved w/
Architectural 1 Approval 29-Jul-2017 B comments
KHEP-RFC-AR-0021-00
Approved w/
Architectural 1 Approval 20-Sep-2017 B comments
KHEP-RFC-AR-0021-01
Approved w/
Architectural 1 Approval 28-Sep-2017 B comments
KHEP-RFC-AR-0022-00
Approved w/
Architectural 1 Approval 26-Oct-2017 B comments
KHEP-RFC-AR-0025-00
Approved w/
Architectural 1 Approval 30-Dec-2017 B comments
KHEP-RFC-AR-0028-00
Approved w/
Architectural 1 Approval 18-Dec-2017 B comments
KHEP-RFC-AR-0029-00
Approved w/
Architectural 1 Approval 2-Jan-2018 B comments
KHEP-RFC-AR-0030-01
Approved w/
Architectural 1 Approval 12-Dec-2017 B comments
KHEP-RFC-AR-0033-00
Approved w/
Architectural 1 Approval 20-Dec-2017 B comments
KHEP-RFC-AR-0037-00
Approved w/
Architectural 1 Approval 20-Dec-2017 B comments
KHEP-RFC-AR-0038-00
Approved w/
Architectural 1 Approval 2-Jan-2018 B comments
KHEP-RFC-AR-0041-00
Approved w/
Architectural 1 Approval 24-Feb-2018 B comments
KHEP-RFC-AR-0042-01
Approved w/
Architectural 1 Approval 24-Jan-2018 B comments
KHEP-RFC-AR-0043-00
Approved w/
Architectural 1 Approval 20-Jan-2018 B comments
KHEP-RFC-AR-0044-00
Approved w/
Architectural 1 Approval 27-Feb-2018 B comments
KHEP-RFC-AR-0044-01
Approved w/
Architectural 1 Approval 31-Jan-2018 B comments
KHEP-RFC-AR-0045-00
Approved w/
Architectural 1 Approval 13-Feb-2018 B comments
KHEP-RFC-AR-0046-00
Approved w/
Architectural 1 Approval 24-Feb-2018 B comments
KHEP-RFC-AR-0047-00
Approved w/
CIVIL 1 Approval 23-Jul-2017 B comments
Approved w/
CIVIL 1 Approval 13-Jul-2017 B comments
Approved w/
CIVIL 1 Approval 20-Jul-2017 B comments
Approved w/
CIVIL 1 Approval 9-Aug-2017 B comments
Approved w/
CIVIL 1 Approval 15-Aug-2017 B comments
Approved w/
CIVIL 1 Approval 9-Oct-2017 B comments
Approved w/
CIVIL 1 Approval 26-Sep-2017 B comments
Approved w/
CIVIL 1 Approval 28-Oct-2017 B comments
CIVIL 1 Approval 27-Dec-2017 A Approved
Approved w/
CIVIL 1 Approval 16-Jan-2018 B comments
CIVIL 1 Approval 11-Jan-2018 A Approved
Approved w/
CIVIL 1 Approval 29-Jan-2018 B Commnets
CIVIL 1 Approval 18-Feb-2018 E Rejected
Approved w/
CIVIL 1 Approval 5-Feb-2018 B Commnets
Approved w/
CIVIL 1 Approval 28-Feb-2018 B Commnets
Approved w/
CIVIL 1 Approval 28-Feb-2018 B Commnets
CIVIL 1 Approval 18-Feb-2018 E Rejected
Approved w/
Electrical 1 Approval 20-Feb-2017 B Commnets
Electrical 1 Approval 13-Mar-2017 E Rejected
Approved w/
Electrical 1 Approval 5-Apr-2017 B Commnets
Approved w/
Electrical 1 Approval 13-Apr-2017 B Commnets
Approved w/
Electrical 1 Approval 28-Aug-2017 B Commnets
Electrical 1 Approval 28-Aug-2017 A Approved
Approved w/
Electrical 1 Approval 25-Oct-2017 B Commnets
Approved w/
Electrical 1 Approval 15-Nov-2017 B Commnets
Approved w/
Electrical 1 Approval 22-Nov-2017 B Commnets
Approved w/
Electrical 1 Approval 27-Dec-2017 B Commnets
Approved w/
Electrical 1 Approval 26-Nov-2017 B Commnets
Approved w/
Electrical 1 Approval 29-Nov-2017 B Commnets
Electrical 1 Approval 11-Dec-2017 A Approved
Approved w/
Electrical 1 Approval 24-Dec-2017 B Commnets
Approved w/
Electrical 1 Approval 24-Dec-2017 B Commnets
Electrical 1 Approval 24-Dec-2017 A Approved
Approved w/
Electrical 1 Approval 24-Dec-2017 B Commnets
Approved w/
Electrical 1 Approval 14-Feb-2018 B Commnets
Approved w/
Electrical 1 Approval 21-Feb-2018 B Commnets
Electrical 1 Approval
Approved w/
Mechanical 1 Approval 12-Feb-2017 B comments
1356DF-M-002
Approved w/
Mechanical 1 Approval 21-Feb-2017 B comments
1356SDF-CL-B2-M-201
Approved w/
Mechanical 1 Approval 12-Feb-2017 B comments
1356SDF-CL-B2-M-201
Approved w/
Mechanical 1 Approval 28-Jun-2017 B comments
KHEP-RFC-ME-0019-00
Approved w/
Mechanical 1 Approval 30-Aug-2017 B comments
KHEP-RFC-ME-0021-00
Approved w/
Mechanical 1 Approval 26-Oct-2017 B comments
KHEP-RFC-ME-0024-00
Approved w/
Mechanical 1 Approval 26-Nov-2017 B comments
KHEP-RFC-ME-0025-00
Approved w/
Mechanical 1 Approval 24-Dec-2017 B Commnets
KHEP-RFC-ME-0026-00
Approved w/
Mechanical 1 Approval 23-Dec-2017 B comments
KHEP-RFC-ME-0027-00
Approved w/
Mechanical 1 Approval 3-Jan-2018 B comments
KHEP-RFC-ME-0028-00
Approved w/
Mechanical 1 Approval 27-Feb-2018 B comments
KHEP-RFC-ME-0032-00
Approved w/
Mechanical 1 Approval 12-Feb-2018 B comments
KHEP-RFC-ME-0033-00
Approved w/
Mechanical 1 Approval 12-Feb-2018 B comments
KHEP-RFC-ME-0034-00
Approved w/
Structural 1 Approval 26-Mar-2017 B comments
1356DF-B2-S-FR-203
Approved w/
Structural 1 Approval 8-Apr-2017 B comments
1356DF-B2-S-FR-203 1356DF-B2-S-GN-401
Approved w/
Structural 1 Approval 26-Mar-2017 B comments
1356DF-A6-S-FR-203 1356DF-CL-A6-202
Approved w/
Structural 1 Approval 29-Mar-2017 B comments
1356DF-A6-S-FR-201 1356DF-CL-A6-201
Approved w/
Structural 1 Approval 14-Feb-2017 B comments
Approved w/
Structural 1 Approval 13-Apr-2017 B comments
Structural 1 Approval 19-Apr-2017 A 1356DF-A6-S-FR-202
Approved 1356DF-A6-S-GN-401 1356DF-CL-A6-702
Structural 1 Approval 19-Apr-2017 A
1356DF-BC4-S-FR-201
Approved 1356DF-CL-BC4-201 1356DF-BC6-S-FR-201 1356DF-CL-BC6-201
Approved w/ 1356DF-U-US-403
Structural 1 Approval 16-May-2017 B comments 1356DF-U-US-413
Approved w/ 1356DF-S-GN-005
Structural 1 Approval 16-May-2017 B comments 1356DF-B2-S-GN-401
1356DF-BC4-S-GN-401
Structural 1 Approval 16-May-2017 A Approved 1356DF-BC4-S-FR-203
1356DF-BC6-S-FR-203
1356DF-BC4-S-GN-802
Structural 1 Approval 24-May-2017 C Revise & Resubmit
1356DF-BC6-S-FR-203
Approved w/ 1356DF-BC4-S-GN-802
1356DF-PT-S-FR-201
Structural 1 Approval 5-Jul-2017 B comments 1356DF-PT-S-GN-401
Approved w/ 1356DF-PT-S-FR-201
Structural 1 Approval 12-Jul-2017 B comments 1356DF-PT-S-GN-401
Approved w/ 1356DF-PT-S-FR-201
Structural 1 Approval 31-Oct-2017 B comments 1356DF-PT-S-GN-401
Approved w/ 1356DF-PTA-S-FR-201
Structural 1 Approval 5-Jul-2017 B comments 1356DF-PTA-S-GN-401
Approved w/ 1356DF-PTA-S-FR-201
Structural 1 Approval 12-Jul-2017 B comments 1356DF-PTA-S-GN-401
Approved w/ 1356DF-PTA-S-FR-201
Structural 1 Approval 31-Oct-2017 B comments 1356DF-PTA-S-GN-401
Structural 1 Approval 27-Sep-2017 A Approved
ASTM A615/615M Grade 420 Mpa
Structural 1 Approval 28-Sep-2017 A Approved 1356DF-S-GN-002
Approved w/
Structural 1 Approval 26-Sep-2017 B comments
1356DF-B2-S-FR-201
Approved w/
Structural 1 Approval 3-Oct-2017 B comments
1356DF-A-G-A902
Approved w/
Structural 1 Approval 5-Nov-2017 B comments
KHEP-SD-ST-0040-02
Approved w/
Structural 1 Approval 19-Oct-2017 B comments
Structural 1 Approval 18-Oct-2017 E Rejected 1356F-A4-S-FR-203 135DF-A4-S-FR-203
Approved w/
Structural 1 Approval 30-Nov-2017 B comments
Structural 1 Approval
REMARKS COMMENTS
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Open
Open
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Open
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Open
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Open
SR NO RISK ASSESSMENT NO. ACTIVITIES / INSPECTION ITEMS SUBMITTED DATE
ARCHITECTURAL
0001 KHEP-RA-AR-0001-00
CIVIL
0001 KHEP-OT-0010-00 Risk Assessment for Earth Work and Excavation 1-Feb-2017
Risk Assessment for Loading and Unloading of Material Manually or with
0002 KHEP-OT-0011-00 1-Feb-2017
Crane
0003 KHEP-OT-0012-00 Risk Assessment for Installation of Chain Link Fence 1-Feb-2017
Risk Assesment for Form Work, Reinforcing Steel Work & Concrete
0004 KHEP-RA-CI-0004-00 14-Feb-2017
Placement
Risk Assessment for Construction of Offices, Warehouse & Workshop
0005 KHEP-RA-CI-0005-00 14-Feb-2017
Installation
0007 KHEP-RA-CI-0007-00 Risk Assessment for Cut and Bend Steel Rebar 21-Feb-2017
Risk Assessment for Civil Work of Electrical Cable Pulling & Cable
0008 KHEP-RA-CI-0008-00 26-Feb-2017
Termination
0011 KHEP-RA-CI-0011-00 Risk Assessment for Water Proofing And Damp Proofing 27-Mar-2017
ELECTRICAL
0001 KHEP-RA-EL-0001-00 Risk Assessment for Electric Cable Pulling & Cable Termination 14-Feb-2017
0002 KHEP-RA-EL-0001-01 Risk Assessment for Electrical Cable Pulling & Cable Termination 26-Feb-2017
HVAC
0001 KHEP-RFC-HVAC-0001-00
MECHANICAL
0001 KHEP-RA-ME-0001-00 Risk Assessment For Installation Of Underground Utilities 21-Feb-2017
0002 KHEP-RA-ME-0002-00 Risk Assessment For Installation Of Fire Fighting System 21-Feb-2017
Risk Assessment for Construction of Offices, Ware House and Work Shop
0003 KHEP-RA-ME-0003-00 20-Mar-2017
Installation Night Work
B Approved w/ Comments
E Rejected
SUBMITTED FOR RESPONDED AS
DISCIPLINE DATE RESPONDED INTERNEL REFERENCE NO
CODE STATUS CODE STATUS
Approved w/
Civil 1 Approval 22-Feb-2017 B Comments
KHEP-RA-CI-0005-00
Approved w/
Civil 1 Approval 22-Feb-2017 B Comments
KHEP-RA-CI-0006-00
Approved w/
Civil 1 Approval 27-Feb-2017 B Comments
KHEP-RA-CI-0009-00
Revise &
Civil 1 Approval 14-May-2017 C Resubmit
KHEP-RA-CI-0012-00
Revise &
Electrical 1 Approval 22-Feb-2017 C Resubmit
KHEP-RA-0007-00
Approved w/
Electrical 1 Approval 27-Feb-2017 B Comments
KHEP-RA-0007-01
Approved w/
Mechanical 1 Approval 26-Mar-2017 B Comments
KHEP-RA-ME_0003-00
REMARKS COMMENTS
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
A Approved
E Rejected
ARCHITECTURAL
Installation of CMU Block work for perimeter and inner partition at
first floor Mockup Building Cluster 69 up to windows lentils level as
001 KHEP-AR-0001 highlighted drawing. With all block installation accessories and wall Cluster 69 Zone 4B Division 04 8-Jul-2017 9-Jul-2017 8:30AM 13-Aug-2017 E Rejected Closed
insulation 50mm polystyrene foam & cast in place window sills Zone
4B, Cluster 69, First floor
Interior Wall Plastering at First Floor Including Dash coat and all
003 KHEP-AR-0003
related accessories Zone 4B, Cluster 69, First Floor
Cluster 69 Zone 4B Division 04 22-Aug-2017 23-Aug-2017 8:30AM 26-Aug-2017 A Approved Closed
Interior Wall Plastering at First Floor Including Dash coat and all
004 KHEP-AR-0004
related accessories Zone 4B, Cluster 69, First Floor
Cluster 69 Zone 4B Division 04 24-Aug-2017 26-Aug-2017 8:30AM 29-Aug-2017 A Approved Closed
Interior Wall dash coating and accessories for Ground Floor - Unit A
005 KHEP-AR-0005
Zone 4B, Cluster 69
Cluster 69 Zone 4B Division 04 26-Aug-2017 27-Aug-2017 8:30AM 29-Aug-2017 A Approved Closed
Installation of CMU wall and Concrete Coping For works at Roof Floor Approved w/
006 KHEP-AR-0006
Zone 4B, Cluster 69
Cluster 69 Zone 4B Division 04 6-Sep-2017 7-Sep-2017 8:30AM 9-Sep-2017 B comments
Closed
Approved w/
006.1 KHEP-AR-0006-01 Concrete coping formworks at Roof floor Zone 4B, Cluster 69 Cluster 69 Zone 4B Division 04 10-Sep-2017 11-Sep-2017 8:30AM 13-Sep-2017 B comments
Closed
007 KHEP-AR-0007 Interior Wall Plastering at Ground Floor Zone 4B, Cluster 69 Cluster 69 Zone 4B Division 04 6-Sep-2017 7-Sep-2017 9:00AM 9-Sep-2017 A Approved Closed
Exterior Wall dash Coating and accessories including preparation for
008 KHEP-AR-0008
exterior groove Zone 4B, Cluster 69
Cluster 69 Zone 4B Division 09 7-Sep-2017 9-Sep-2017 9:30AM 13-Sep-2017 A Approved Closed
009 KHEP-AR-0009 Installation of drywall at first floor Zone 4B, Cluster 69 Cluster 69 Zone 4B Division 09 12-Sep-2017 14-Sep-2017 10:00 AM RECALLED
Exterior Wall dash Coating and accessories at Roof Floor Zone 4B,
010 KHEP-AR-0010
Cluster 69
Cluster 69 Zone 4B Division 09 21-Sep-2017 23-Sep-2017 9:30AM 24-Sep-2017 A Approved Closed
Installation of Metal Ceiling system Zone 4B, Cluster 69, First floor
013 KHEP-AR-0013 Cluster 69 Zone 4B Division 09 28-Sep-2017 30-Sep-2017 8:30AM 3-Oct-2017 A Approved Closed
Plastering at roof floor exterior wall (Unit A & B) Zone 4B, Cluster 69,
014 KHEP-AR-0014
Roof floor
Cluster 69 Zone 4B Division 09 28-Sep-2017 30-Sep-2017 9:30AM 1-Oct-2017 A Approved Closed
Dash Coating at roof floor inner wall (Unit A & B) Zone 4B, Cluster
015 KHEP-AR-0015
69, Roof floor
Cluster 69 Zone 4B Division 09 28-Sep-2017 30-Sep-2017 10:30AM 1-Oct-2017 A Approved Closed
Plastering at roof floor inner wall (Unit A & B) Zone 4B, Cluster 69,
016 KHEP-AR-0016
Roof floor
Cluster 69 Zone 4B Division 09 30-Sep-2017 1-Oct-2017 9:00AM 3-Oct-2017 A Approved Closed
Concrete scree ding at First Floor (Unit A) Zone 4B, Cluster 69, First
017 KHEP-AR-0017
floor
Cluster 69 Zone 4B Division 03 1-Oct-2017 2-Oct-2017 8:30AM 4-Oct-2017 E Rejected Closed
Concrete scree ding at First Floor (Unit A) Zone 4B, Cluster 69, First
017.1 KHEP-AR-0017-01
floor
Cluster 69 Zone 4B Division 03 7-Oct-2017 8-Oct-2017 8:00AM 9-Oct-2017 A Approved Closed
Installation of Metal Studding for Grounding floor area cluster 69, B2 Approved w/
018 KHEP-AR-0018
Unit A only Zone 4B, Cluster 69, Ground floor
Cluster 69 Zone 4B Division 09 4-Oct-2017 5-Oct-2017 8:30AM 7-Oct-2017 B comments
Closed
Flood test for wet areas water Proofing - Cluster 69, B2 (Unit A)
021 KHEP-AR-0021
Zone 4B, Cluster 69
Cluster 69 Zone 4B Division 03 7-Oct-2017 8-Oct-2017 1:30PM 9-Oct-2017 E Rejected Closed
Re-Flood test for wet areas water Proofing - Cluster 69, B2 (Unit A)
021.1 KHEP-AR-0021-01
Zone 4B, Cluster 69
Cluster 69 Zone 4B Division 03 12-Oct-2017 14-Oct-2017 8:30AM 15-Oct-2017 A Approved Closed
External wall painting - Cluster 69, B2 (Unit A & B) Zone 4B, Cluster
025 KHEP-AR-0025
69
Cluster 69 Zone 4B Division 09 9-Oct-2017 10-Oct-2017 8:30AM 15-Oct-2017 E Rejected Closed
026 KHEP-AR-0026 Internal wall painting - Cluster 69, B2 (Unit A) Zone 4B, Cluster 69 Cluster 69 Zone 4B Division 09 9-Oct-2017 10-Oct-2017 10:30AM 15-Oct-2017 E Rejected Closed
Water proofing at wet areas for Ground Floor - Cluster 69, B2 (Unit
029 KHEP-AR-0029
A) Including Kitchen Zone 4B, Cluster 69, Ground Floor
Cluster 69 Zone 4B Division 03 21-Oct-2017 22-Oct-2017 8:30AM 26-Oct-2017 E Rejected Closed
Water proofing at wet areas for Ground Floor - Cluster 69, B2 (Unit Approved w/
029.1 KHEP-AR-0029-01
A) Zone 4B, Cluster 69, Ground Floor
Cluster 69 Zone 4B Division 03 2-Dec-2017 3-Dec-2017 8:30AM 11-Dec-2017 B comments
Closed
Water proofing at balconies for First Floor - Cluster 69, B2 (Unit A) Approved w/
030.1 KHEP-AR-0030-01
Zone 4B, Cluster 69, First Floor
Cluster 69 Zone 4B Division 03 2-Dec-2017 3-Dec-2017 8:45AM 11-Dec-2017 B comments
Closed
Internal wall painting, First coating - Cluster 69, B2 (Unit A) Zone 4B,
034 KHEP-AR-0034
Cluster 69
Cluster 69 Zone 4B Division 09 1-Nov-2017 4-Nov-2017 8:30AM 6-Nov-2017 A Approved Closed
Interior Wall Dash Coating and Accessories for Ground Floor - Unit B
036 KHEP-AR-0036
Zone 4B, Cluster 69, GroundFloor
Cluster 69 Zone 4B Division 09 5-Nov-2017 6-Nov-2017 8:30AM 9-Nov-2017 A Approved Closed
Installation of CMU wall from 2nd Layer to Level of Lintel Beam Soffit
044.1 KHEP-AR-0044-01 Cluster 1 A6 Unit A,B,C,D,E & F Excluding wall Areas for Terracotta Cluster 01 A6 Zone 1B Division 04 15-Jan-2018 16-Jan-2018 9:00 AM 20-Jan-2018 A Approved Closed
Cladding & some External balcony walls
049 KHEP-AR-0049 Concrete screed Pouring at first floor Cluster14, B2 Unit A&B Cluster 14 Unit A & B Division 03 20-Dec-2017 21-Dec-2017 10:00 AM 24-Dec-2017 A Approved Closed
Installation of Metal studdings (Drywall) and one (1) phase of
Approved w/
050 KHEP-AR-0050 gypsum wall forGrgound floor Cluster 69, B2 Unit B Zone 4B, Cluster Cluster 69 B2 Zone 4B Division 09 21-Dec-2017 23-Dec-2017 8:30 AM 27-Dec-2017 B comments
Closed
69
Intallation of CMU wall at Roof Floor Cluster 15, B2 Units A & B Zone Approved w/
051 KHEP-AR-0051
1B, Cluster 15, B2
Cluster 15 B2 Zone 1B Division 04 21-Dec-2017 23-Dec-2017 11:00 AM 27-Dec-2017 B comments
Closed
Intallation of CMU wall outer perimeter wall first layer Excluding wall Approved w/
055 KHEP-AR-0055
area for Terracotta Cladding Cluster 10 B2 Unit A,B
Cluster 10 B2 Unit A,B Division 04 27-Dec-2017 28-Dec-2017 8:00 AM 31-Dec-2017 B comments
Closed
Intallation of CMU wall outer perimeter wall first layer Excluding wall Approved w/
056 KHEP-AR-0056
area for Terracotta Cladding Cluster 11 B2 Zone 1B
Cluster 11 B2 Zone 1B Division 04 27-Dec-2017 28-Dec-2017 8:30 AM 31-Dec-2017 B comments
Closed
Intallation of CMU wall outer perimeter wall first layer Excluding wall Approved w/
057 KHEP-AR-0057
area for Terracotta Cladding Cluster 12 B2 Zone 1B
Cluster 12 B2 Zone 1B Division 04 27-Dec-2017 28-Dec-2017 9:00 AM 31-Dec-2017 B comments
Closed
Intallation of CMU wall outer perimeter wall first layer Excluding wall Approved w/
058 KHEP-AR-0058
area for Terracotta Cladding Cluster 17 Zone 1B
Cluster 17 Zone 1B Division 04 27-Dec-2017 28-Dec-2017 9:30 AM 31-Dec-2017 B comments
Closed
Intallation of CMU wall outer perimeter wall first layer Excluding wall Approved w/
059 KHEP-AR-0059
area with Proposed Terracotta Cladding Cluster 1 Zone 1A
Cluster 01 Zone 1A Division 04 27-Dec-2017 28-Dec-2017 10:00 AM 31-Dec-2017 B comments
Closed
Intallation of CMU wall outer perimeter wall first layer Excluding wall Approved w/
060 KHEP-AR-0060
area with Proposed Terracotta Cladding Cluster 15 Zone 1A
Cluster 15 Zone 1A Division 04 27-Dec-2017 28-Dec-2017 10:30 AM 31-Dec-2017 B comments
Closed
Installation of CMU wall from 2nd Layer to Level of Lintel Beam Soffit
061 KHEP-AR-0061 Cluster 2 A6 Unit A,B,C,D,E & F Excluding wall Areas for Terracotta Cluster 02 Zone 1B Division 04 30-Dec-2017 31-Dec-2017 8:00 AM RECALLED
Cladding
Installation of CMU wall from 2nd Layer to Level of Lintel Beam Soffit Approved w/
062 KHEP-AR-0062
Cluster 15 B2 Unit A & B Excluding wall Areas for Terracotta Cladding
Cluster 15 B2 Zone 1B Division 04 30-Dec-2017 31-Dec-2017 8:30 AM 3-Jan-2018 B comments
Closed
Installation of CMU wall from 2nd Layer to Level of Lintel Beam Soffit Approved w/
063 KHEP-AR-0063
Cluster 14 B2 Unit A & B Excluding wall Areas for Terracotta Cladding
Cluster 14 B2 Zone 1B Division 04 30-Dec-2017 31-Dec-2017 9:00 AM 3-Jan-2018 B comments
Closed
Installation of CMU wall from 2nd Layer to Level of Lintel Beam Soffit Approved w/
064 KHEP-AR-0064
Cluster 13 B2 Unit A & B Excluding wall Areas for Terracotta Cladding
Cluster 13 B2 Zone 1B Division 04 30-Dec-2017 31-Dec-2017 9:30 AM 3-Jan-2018 B comments
Closed
Installation of CMU wall from 2nd Layer to Level of Lintel Beam Soffit Approved w/
065 KHEP-AR-0065
Cluster 12 B2 Unit A & B Excluding wall Areas for Terracotta Cladding
Cluster 12 B2 Zone 1B Division 04 8-Jan-2018 9-Jan-2018 11:00 AM 15-Jan-2018 B comments
Closed
Installation of CMU wall from 2nd Layer to Level of Lintel Beam Soffit Approved w/
066 KHEP-AR-0066
Cluster 11 B2 Unit A & B Excluding wall Areas for Terracotta Cladding
Cluster 11 B2 Zone 1B Division 04 30-Dec-2017 31-Dec-2017 11:00 AM 3-Jan-2018 B comments
Closed
Installation of CMU wall from 2nd Layer to Level of Lintel Beam Soffit Approved w/
067 KHEP-AR-0067
Cluster 10 B2 Unit A & B Excluding wall Areas for Terracotta Cladding
Cluster 10 B2 Zone 1B Division 04 31-Dec-2017 1-Jan-2018 10:00 AM 4-Jan-2018 B comments
Closed
Installation of CMU wall from 2nd Layer to Level of Lintel Beam Soffit Approved w/
068 KHEP-AR-0068
Cluster 5 B2 Unit A & B Excluding wall Areas for Terracotta Cladding
Cluster 05 B2 Zone 1B Division 04 31-Dec-2017 1-Jan-2018 10:30 AM 4-Jan-2018 B comments
Closed
Installation of CMU wall from 2nd Layer to Level of Lintel Beam Soffit Approved w/
069 KHEP-AR-0069
Cluster 17 B2 Unit A & B Excluding wall Areas for Terracotta Cladding
Cluster 17 B2 Zone 1B Division 04 31-Dec-2017 1-Jan-2018 11:00 AM 4-Jan-2018 B comments
Closed
079 KHEP-AR-0079 Installation of CMU wall at roof floor Cluster 5 Zone 1B Cluster 05 Zone 1B Division 04 8-Jan-2018 9-Jan-2018 9:30 AM 15-Jan-2018 A Approved Closed
Installation of CMU wall for terracotta cladding,first layer of first floor
080 KHEP-AR-0080
Cluster 15 B2 Zone 1B Unit A&B
Cluster 15 B2 Zone 1B Division 04 9-Jan-2018 10-Jan-2018 3:30 PM 15-Jan-2018 E Rejected Closed
Concrete Screed pouring at first floor except wet areas & Balconies
083 KHEP-AR-0083
Cluster 1 A6 Units ABCDE & F Zone 1B
Cluster 01 A6 Zone 1B Division 03 10-Jan-2018 11-Jan-2018 8:00 AM 15-Jan-2018 A Approved Closed
Application of water Proofing for wet areas at first floor unit B Cluster
087 KHEP-AR-0087
69 Flood Test Zone 4B
Cluster 69 Zone 4B Division 03 14-Jan-2018 15-Jan-2018 8:30 AM 20-Jan-2018 A Approved Closed
Epoxy Paint Sample Color matte finish only size 1.5x7mts Garage Approved w/
089 KHEP-AR-0089
Cluster 69 B2 Unit A Zone 4B
Cluster 69 B2 Zone 4B Division 09 15-Jan-2018 15-Jan-2018 8:30 AM 20-Jan-2018 B comments
Closed
090 KHEP-AR-0090 Installation of CMU wall at roof floor Cluster 7 B2 Unit A & B Zone 1B Cluster 07 Zone 1B Division 04 15-Jan-2018 16-Jan-2018 10:00 AM 20-Jan-2018 A Approved Closed
Lintel Beam Installation for CMU external walls Cluster 1 A6 unit A&F
096 KHEP-AR-0096
Excluding walls with Terracotta Cladding Zone 1B
Cluster 01 A6 Zone 1B Division 3 16-Jan-2018 17-Jan-2018 8:00 AM 20-Jan-2018 A Approved Closed
097 KHEP-AR-0097 Installation of cmu wall at roof floor unit A&B Zone 1B Cluster 11 Cluster 11 Zone 1B Division 4 17-Jan-2018 18-Jan-2018 9:00 AM 21-Jan-2018 A Approved Closed
Pouring of concrete screed for first floor Excluding wet areas &
099 KHEP-AR-0099
balconies Cluster 11 B2 unit A&B Zone 1B
Cluster 11 B2 Zone 1B Division 3 18-Jan-2018 20-Jan-2018 9:30 AM 21-Jan-2018 A Approved Closed
Water proofing surface preparation with cant strip & base primer
0105 KHEP-AR-0105
ground floor Cluster 69 Unit B wet areas Zone 4B
Cluster 69 B2 Zone 4B Division 3 21-Jan-2018 22-Jan-2018 8:30 AM 23-Jan-2018 A Approved Closed
Water proofing first coating for liquid membrane ground floor Cluster Approved w/
0110 KHEP-AR-0110
69 unit B wet areas
Cluster 69 Zone 4B Division 3 22-Jan-2018 23-Jan-2018 8:00 AM 24-Jan-2018 B comments
Closed
Water proofing surface preparation with cant strip & primer first floor Approved w/
0111 KHEP-AR-0111
Cluster 69 Unit B balconies Zone 4B
Cluster 69 Zone 4B Division 3 22-Jan-2018 23-Jan-2018 8:30 AM 24-Jan-2018 B comments
Closed
CMU laying from 2nd layer to level of lintel beam soffit Cluster 7 unit
0115 KHEP-AR-0115
A & B first floor including wall areas for terracotta cladidng Zone 1B
Cluster 07 Zone 1B Division 4 23-Jan-2018 24-Jan-2018 10:00 AM 24-Jan-2018 E Rejected Closed
CMU laying from 2nd layer to level of lintel beam soffit Cluster 7 unit
0115.1 KHEP-AR-0115-01
A & B first floor excluding wall areas for terracotta cladidng Zone 1B
Cluster 07 Zone 1B Division 4 28-Jan-2018 29-Jan-2018 8:30 AM 31-Jan-2018 A Approved Closed
CMU laying from 2nd layer to level of lintel beam soffit Cluster 8 B2
0116 KHEP-AR-0116 unit A & B first floor including wall areas for terracotta cladidng Zone Cluster 08 Zone 1B Division 4 23-Jan-2018 24-Jan-2018 10:30 AM 24-Jan-2018 E Rejected Closed
1B
CMU laying from 2nd layer to level of lintel beam soffit Cluster 2 A6
0119 KHEP-AR-0119 Cluster 02 A6 Zone 1B Division 4 24-Jan-2018 25-Jan-2018 8:30 AM RECALLED
unit A,B,C,D,E & F ground floor Zone 1B
Lintel beam installation for external walls Cluster 1 A6 unit A to F
0120 KHEP-AR-0120 ground floor excluding lintel beams for walls with terracotta cladding Cluster 01 A6 Zone 1B Division 3 24-Jan-2018 25-Jan-2018 9:00 AM 28-Jan-2018 A Approved Closed
& garage doors Zone 1B
Lintel beam installation for external walls Cluster 10 B2 unit A to B
0121 KHEP-AR-0121 first floor excluding lintel beams for walls with terracotta cladding Cluster 10 B2 Zone 1B Division 4 24-Jan-2018 25-Jan-2018 9:30 AM 28-Jan-2018 A Approved Closed
Zone 1B
Lintel beam installation for external walls Cluster 11 B2 unit A to B
0122 KHEP-AR-0122 first floor excluding lintel beams for walls with terracotta cladding Cluster 11 B2 Zone 1B Division 4 24-Jan-2018 25-Jan-2018 10:00 AM 28-Jan-2018 A Approved Closed
Zone 1B
Concrete screed pouring at first floor Cluster 10 B2 unit A & B Zone
0123 KHEP-AR-0123
1B
Cluster 10 B2 Zone 1B Division 4 24-Jan-2018 25-Jan-2018 10:30 AM 28-Jan-2018 A Approved Closed
Approved w/
0124 KHEP-AR-0124 Painting for interior walls surface preparation Zone 4B Cluster 69 Cluster 69 Zone 4B Division 9 25-Jan-2018 27-Jan-2018 8:30 AM 30-Jan-2018 B comments
Closed
Painting for interior walls surface preparation Ground floor Zone 4B Approved w/
0125 KHEP-AR-0125
Cluster 69
Cluster 69 Zone 4B Division 9 25-Jan-2018 27-Jan-2018 9:30 AM 30-Jan-2018 B comments
Closed
Painting for external walls primer application ground floor first floor &
0128 KHEP-AR-0128
roof floor unit A & B Cluster 69 Zone 4B
Cluster 69 Zone 4B Division 9 28-Jan-2018 29-Jan-2018 9:30 AM 31-Jan-2018 A Approved Closed
Installatio of CMU walls for terracotta cladding first layer of ground Approved w/
0130.1 KHEP-AR-0130-01
floor Cluster 15 B2 unit A-B Ground floor Zone 1B
Cluster 15 Zone 1B Division 4 21-Feb-2018 22-Feb-2018 9:30 AM 24-Feb-2018 B comments
Open
Primer application prior 1st coating for interior walls Cluster 69 first
0132 KHEP-AR-0132
floor unit B Zone 4B
Cluster 69 Zone 4B Division 9 31-Jan-2018 1-Feb-2018 9:00 AM 4-Feb-2018 A Approved Closed
0134 KHEP-AR-0134 Installation of CMU wall at roof floor Cluster 12 B2 unit A-B Zone 1B Cluster 12 B2 Zone 1B Division 4 4-Feb-2018 5-Feb-2018 9:00 AM RECALLED
0136 KHEP-AR-0136 Installation of CMU wall at roof floor Cluster 19 B2 unit A-B Zone 1B Cluster 19 B2 Zone 1B Division 4 4-Feb-2018 6-Feb-2018 8:00 AM RECALLED Open
0137 KHEP-AR-0137 Installation of CMU wall at roof floor Cluster 20 B2 unit A-B Zone 1B Cluster 20 B2 Zone 1B Division 4 4-Feb-2018 6-Feb-2018 8:30 AM RECALLED Open
0138 KHEP-AR-0138 Installation of CMU wall at roof floor Cluster 27 B2 unit A-B Zone 2B Cluster 27 B2 Zone 2B Division 4 4-Feb-2018 6-Feb-2018 9:00 AM RECALLED Open
0139 KHEP-AR-0139 Installation of CMU wall at roof floor Cluster 68 B2 unit A-B Zone 4B Cluster 68 B2 Zone 4B Division 4 4-Feb-2018 6-Feb-2018 9:30 AM RECALLED Open
Application of 1st coating for interior walls Cluster 69 first floor unit B
0140 KHEP-AR-0140
Zone 4B
Cluster 69 Zone 4B Division 9 5-Feb-2018 6-Feb-2018 8:30 AM 7-Feb-2018 A Approved Closed
Approved w/
0144 KHEP-AR-0144 Installation of CMU wall at roof floor Cluster 75 B2 unit A-B Zone 1B Cluster 75 B2 Zone 1B Division 4 7-Feb-2018 8-Feb-2018 8:30 AM 10-Feb-2018 B comments
Closed
Application of 2nd coating for interior walls Cluster 69 first floor unit Approved w/
0147 KHEP-AR-0147
B Zone 4B
Cluster 69 Zone 4B Division 9 13-Feb-2018 14-Feb-2018 8:00 AM 14-Feb-2018 B comments
Closed
Application of 2nd coating for interior walls Cluster 69 ground floor Approved w/
0148 KHEP-AR-0148
unit B Zone 4B
Cluster 69 Zone 4B Division 9 13-Feb-2018 14-Feb-2018 8:30 AM 14-Feb-2018 B comments
Closed
Installation of CMU wall from top of lintel beams to soffit of first floor
0158 KHEP-AR-0158 beams & slab ledge Cluster 15 B2 unit A-B first floor Excluding wall Cluster 15 Zone 1B Division 4 21-Feb-2018 22-Feb-2018 10:00 AM 26-Feb-2018 A Approved Closed
areas for terracotta cladding Zone 1B Cluster 15
0168 KHEP-AR-0168 Installation of CMU wall at roof floor Cluster 01 A6 Zone 4B Cluster 01 A6 Zone 4B Division 4 26-Feb-2018 27-Feb-2018 9:30 AM 28-Feb-2018 A Approved Closed
CIVIL
Surface Preparation Prior to Backfilling in Temporary Facility Area Approved w/
001 KHEP-CI-0001
Mobilization
Mobilization Zone 5D Division 31 28-Jan-2017 29-Jan-2017 B comments
Closed
005.1 KHEP-CI-0005-01 3rd layer compaction test Inspection NA NA 4-Feb-2017 3-Feb-2017 A Approved Closed
006 KHEP-CI-0006 Surface preparation for excavated grade prior to backfilling NA NA 30-Jan-2017 4-Feb-2017 Cancelled Closed
Revise &
KHEP-CI-0007
007 Review test reports for general and select fill materials NA NA 30-Jan-2017 31-Jan-2017 Resubmit as Closed
(to CT-CI-0002-00)
submittal
Approved w/
008 KHEP-CI-0008 Compaction test inspection prior to blinding concrete NA NA 31-Jan-2017 5-Feb-2017 B comments
Closed
Approved w/
009 KHEP-CI-0009 Blinding concrete sampling, testing and placement inspection NA NA 31-Jan-2017 5-Feb-2017 B comments
Closed
010 KHEP-CI-0010 Termite control applications inspection NA NA 31-Jan-2017 5-Feb-2017 A Approved Closed
Approved w/
011 KHEP-CI-0011 Fill placement and compaction test inspection NA NA 31-Jan-2017 5-Feb-2017 B comments
Closed
012 KHEP-CI-0012 Termite control applications inspection NA NA 1-Feb-2017 5-Feb-2017 E Rejected Closed
012.1 KHEP-CI-0012-01 Termite control applications inspection NA NA 11-Feb-2017 12-Feb-2017 A Approved Closed
013 KHEP-CI-0013 Blinding concrete sampling and testing for foundations NA NA 1-Feb-2017 5-Feb-2017 E Rejected Closed
Approved w/
013.1 KHEP-CI-0013-01 Blinding concrete sampling and testing for foundations NA NA 11-Feb-2017 12-Feb-2017 B comments
Closed
014 KHEP-CI-0014 Clearing, grabbing and leveling prior to upcoming activities NA NA 1-Feb-2017 6-Feb-2017 E Rejected Closed
Approved w/
015 KHEP-CI-0015 Soil Sampling Inspection NA NA 4-Feb-2017 6-Feb-2017 B comments
Closed
016 KHEP-CI-0016 Compaction Test Inspection for final layer of temporary facility roads NA NA 5-Feb-2017 9-Feb-2017 A Approved Closed
017 KHEP-CI-0017 Grading and cutting inspection NA NA 5-Feb-2017 8-Feb-2017 A Approved Closed
018 KHEP-CI-0018 Compaction test inspection prior to backfilling NA NA 6-Feb-2017 9-Feb-2017 Cancelled Closed
019 KHEP-CI-0019 Clearing and grabbing prior to cutting and filling NA NA 7-Feb-2017 9-Feb-2017 Cancelled Closed
Approved w/
020 KHEP-CI-0020 Soil sampling for testing NA NA 7-Feb-2017 9-Feb-2017 B comments
Closed
021 KHEP-CI-0021 Formation level of grading for area as per attached drawing Cluster 03 Zone 1A 8-Feb-2017 14-Feb-2017 A Approved Closed
022 KHEP-CI-0022 Formation level of grading for area as per attached drawing Cluster 04 Zone 1A 8-Feb-2017 14-Feb-2017 A Approved Closed
023 KHEP-CI-0023 Formation level of grading for area as per attached drawing Cluster 05 Zone 2A 8-Feb-2017 14-Feb-2017 A Approved Closed
024 KHEP-CI-0024 Formation level of grading for area as per attached drawing Cluster 06 Zone 2A 8-Feb-2017 14-Feb-2017 A Approved Closed
025 KHEP-CI-0025 Formation level of grading for area as per attached drawing Cluster 07 Zone 3A 8-Feb-2017 14-Feb-2017 A Approved Closed
026 KHEP-CI-0026 Formation level of grading for area as per attached drawing Cluster 08 Zone 3A 8-Feb-2017 14-Feb-2017 A Approved Closed
027 KHEP-CI-0027 Formation level of grading for area as per attached drawing Cluster 11 Zone 4A 8-Feb-2017 14-Feb-2017 A Approved Closed
028 KHEP-CI-0028 Formation level of grading for area as per attached drawing Cluster 12 Zone 4A 8-Feb-2017 14-Feb-2017 A Approved Closed
029 KHEP-CI-0029 Formation level of grading for area as per attached drawing Cluster 01 Zone 1B 8-Feb-2017 14-Feb-2017 Cancelled Closed
030 KHEP-CI-0030 Formation level of grading for area as per attached drawing Cluster 68,69 Zone 4B 8-Feb-2017 14-Feb-2017 Cancelled Closed
031 KHEP-CI-0031 Formation level of grading for area as per attached drawing Cluster 02 Zone 1B 8-Feb-2017 14-Feb-2017 Cancelled Closed
Approved w/
032 KHEP-CI-0032 Compaction test for General fill, 1st layer backfilling Cluster 03 Zone 1A 9-Feb-2017 14-Feb-2017 B comments
Closed
Approved w/
033 KHEP-CI-0033 Compaction test for General fill, 1st layer backfilling Cluster 04 Zone 1A 9-Feb-2017 14-Feb-2017 B comments
Closed
Approved w/
034 KHEP-CI-0034 Compaction test for General fill, 1st layer backfilling Cluster 11 Zone 4A 9-Feb-2017 14-Feb-2017 B comments
Closed
035 KHEP-CI-0035 Compaction test for General fill, 1st layer backfilling Cluster 12 Zone 4A 9-Feb-2017 14-Feb-2017 A Approved Closed
Surface preparation and compaction inspection prior to structural fill Approved w/
036 KHEP-CI-0036
activity
Cluster 69 Zone 4B 11-Feb-2017 14-Feb-2017 B comments
Closed
Compaction test for 1st and final layer of selected fill prior to blinding
037 KHEP-CI-0037
concrete
Cluster 69 Zone 4B 11-Feb-2017 13-Feb-2017 E Rejected Closed
Compaction test for 1st and final layer of selected fill prior to blinding
037.1 KHEP-CI-0037-01
concrete
Cluster 69 Zone 4B 14-Feb-2017 14-Feb-2017 A Approved Closed
038 KHEP-CI-0038 Compaction test for 1st layer of General fill prior Cluster 05 Zone 2A 13-Feb-2017 14-Feb-2017 A Approved Closed
Inspection for Vertical & Horizontal alignment Structural Fill 1st &
039 KHEP-CI-0039
Final Layer
Cluster 69 Zone 4B 14-Feb-2017 15-Feb-2017 E Rejected Closed
Should
Epoxy coated steel bars receiving inspection for 10mm, 12mm,
040 KHEP-CI-0040
16mm & 20mm
NA NA 13-Feb-2017 14-Feb-2017 E Submitted as Closed
MRI format
041 KHEP-CI-0041 Termite control applications Cluster 69 Zone 4B 13-Feb-2017 14-Feb-2017 A Approved Closed
042 KHEP-CI-0042 Blinding Concrete sampling, testing and placement inspection Cluster 69 Zone 4B 13-Feb-2017 15-Feb-2017 A Approved Closed
043 KHEP-CI-0043 Compaction test for 2nd layer backfiling of general fill Cluster 03 Zone 1A 14-Feb-2017 16-Feb-2017 E Rejected Closed
043.1 KHEP-CI-0043-01 Compaction test for 2nd layer backfiling of general fill Cluster 03 Zone 1A 19-Feb-2017 20-Feb-2017 A Approved Closed
044 KHEP-CI-0044 Compaction test for 2nd layer general fill prior to 3rd layer Cluster 04 Zone 1A 14-Feb-2017 16-Feb-2017 E Rejected Closed
044.1 KHEP-CI-0044-01 Compaction test for 2nd layer general fill prior to 3rd layer Cluster 04 Zone 1A 19-Feb-2017 20-Feb-2017 A Approved Closed
045 KHEP-CI-0045 Compaction test for 2nd layer general fill prior to 3rd layer Cluster 05 Zone 2A 14-Feb-2017 16-Feb-2017 E Rejected Closed
045.1 KHEP-CI-0045-01 Compaction test for 2nd layer general fill prior to 3rd layer Cluster 05 Zone 2A 19-Feb-2017 20-Feb-2017 A Approved Closed
Approved w/
046 KHEP-CI-0046 Compaction test for 2nd layer general fill prior to 3rd layer Cluster 11 Zone 4A 14-Feb-2017 18-Feb-2017 B comments
Closed
Approved w/
047 KHEP-CI-0047 Compaction test for 2nd layer general fill prior to 3rd layer Cluster 12 Zone 4A 14-Feb-2017 18-Feb-2017 B comments
Closed
048 KHEP-CI-0048 Review of Material Sampling Test Report (General Fill) NA NA 14-Feb-2017 14-Feb-2017 A Approved Closed
Approved w/
049 KHEP-CI-0049 Soil sampling for testing NA NA 14-Feb-2017 16-Feb-2017 B comments
Closed
049.1 KHEP-CI-0049-01 Review of Soil sampling for testing NA NA 21-Feb-2017 23-Feb-2017 A Approved Closed
50 KHEP-CI-0050 Soil Testing & Review of Test Report NA NA 14-Feb-2017 16-Feb-2017 A Approved Closed
Approved w/
51 KHEP-CI-0051 Compaction Test-1st layer of General fill Cluster 06 Zone 2A 15-Feb-2017 19-Feb-2017 B comments
Closed
Approved w/
52 KHEP-CI-0052 Compaction Test-1st layer of General Fill Cluster 07 Zone 3A 15-Feb-2017 19-Feb-2017 B comments
Closed
53 KHEP-CI-0053 Compaction Test - Formation level of grading for Area Cluster 01 Zone 1A 16-Feb-2017 18-Feb-2017 E Rejected Closed
053.1 KHEP-CI-0053-01 Compaction Test - Formation level of grading for Area Cluster 01 Zone 1A 20-Feb-2017 22-Feb-2017 A Approved Closed
054 KHEP-CI-0054 Compaction Test - Formation level of grading for Area (Cut Area) Cluster 09 Zone 4A 16-Feb-2017 19-Feb-2017 Cancelled Closed
055 KHEP-CI-0055 Compaction Test - Formation level of grading for Area (Cut Area) Cluster 10 Zone 4A 16-Feb-2017 19-Feb-2017 Cancelled Closed
056 KHEP-CI-0056 Compaction Test of 1st Layer Backfill - General Fill Materials NA NA 16-Feb-2017 19-Feb-2017 E Rejected Closed
056.1 KHEP-CI-0056-01 Compaction Test of 1st Layer Backfill - General Fill Materials NA NA 21-Feb-2017 22-Feb-2017 A Approved Closed
057 KHEP-CI-0057 Compaction Test of 2nd Layer Backfill - General Fill Materials NA NA 21-Feb-2017 23-Feb-2017 A Approved Closed
058 KHEP-CI-0058 Compaction Test of 2nd Layer Backfill - General Fill Materials NA NA 21-Feb-2017 23-Feb-2017 A Approved Closed
Approved w/
059 KHEP-CI-0059 Soil sampling for testing of Selected Fill Materials NA NA 21-Feb-2017 23-Feb-2017 B comments
Closed
Approved w/
060 KHEP-CI-0060 Formation Level and Clearing Before Start Backfilling NA NA 21-Feb-2017 26-Feb-2017 B comments
Closed
061 KHEP-CI-0061 Formation Level Mobilization Satellite Office No. 02 NA NA 21-Feb-2017 23-Feb-2017 A Approved Closed
062 KHEP-CI-0062 Cast in place concrete formwork inspection (MOCKUP) NA NA 21-Feb-2017 23-Feb-2017 A Approved Closed
063 KHEP-CI-0063 Compaction test of the third layer general fill Cluster 04 Zone 1A 22-Feb-2017 26-Feb-2017 A Approved Closed
064 KHEP-CI-0064 Compaction test of the third layer general fill Cluster 05 Zone 3A 22-Feb-2017 26-Feb-2017 A Approved Closed
Formation level and Surface Preparation prior to backfilling of
065 KHEP-CI-0065
200mm thk Structural fill- ( Selected Fill Materials)
Cluster 03 Zone 1A 22-Feb-2017 26-Feb-2017 A Approved Closed
066 KHEP-CI-0066 Compaction test first layer general fill Cluster 01 Zone 1A 23-Feb-2017 27-Feb-2017 E Rejected Closed
066.1 KHEP-CI-0066-01 Compaction test first layer general fill Cluster 01 Zone 1A 27-Feb-2017 1-Mar-2017 A Approved Closed
067 KHEP-CI-0067 Compaction test second layer general fill Cluster 08 Zone 3A 23-Feb-2017 27-Feb-2017 A Approved Closed
068 KHEP-CI-0068 Formation level of grading and compaction test Cluster 02 Zone 1A 27-Feb-2017 1-Mar-2017 E Rejected Closed
Approved w/
069 KHEP-CI-0069 Compaction test first & final layer structural fill Cluster 03 Zone 1A 27-Feb-2017 28-Feb-2017 B comments
Closed
070 KHEP-CI-0070 Inspection of Compaction test Cluster 05 Zone 2A 27-Feb-2017 1-Mar-2017 A Approved Closed
Approved w/
071 KHEP-CI-0071 Inspection of Compaction test Cluster 04 Zone 1A 27-Feb-2017 28-Feb-2017 B comments
Closed
073 KHEP-CI-0073 Inspection compaction test third layer general fill Cluster 06 Zone 2A 27-Feb-2017 1-Mar-2017 E Rejected Closed
073.1 KHEP-CI-0073-01 Inspection compaction test third layer general fill Cluster 06 Zone 2A 1-Mar-2017 4-Mar-2017 A Approved Closed
074 KHEP-CI-0074 Inspection compaction test third layer general fill Cluster 07 Zone 3A 27-Feb-2017 1-Mar-2017 E Rejected Closed
074.1 KHEP-CI-0074-01 Inspection compaction test third layer general fill Cluster 07 Zone 3A 1-Mar-2017 4-Mar-2017 A Approved Closed
CBR-California bearing ratio test (Excavated Soil Material On Site
075 KHEP-CI-0075 NA NA 27-Feb-2017 1-Mar-2017 Cancelled Closed
General Fill)
076 KHEP-CI-0076 Cast in place concrete formwork inspection NA NA 27-Feb-2017 28-Feb-2017 E Rejected Closed
077.1 KHEP-CI-0076-01 Cast in place concrete formwork inspection NA NA 1-Mar-2017 2-Mar-2017 A Approved Closed
Concrete Sampling,Testing and Placement Inspection for RC Footing
077 KHEP-CI-0077
(Mockup)
Cluster 69 Zone 4B 27-Feb-2017 2-Mar-2017 A Approved Closed
Inspection: Compaction test first layer genral fill ( Road 04 STA Approved w/
078 KHEP-CI-0078
0+025 to 0+100) (Zone-5A)
Road 04 Zone 5A 27-Feb-2017 1-Mar-2017 B comments
Closed
Installation of reinforcment steel bar ,embedded item & form closure Approved w/
082 KHEP-CI-0082
inspection for R.C Foundation
Cluster 01 A6 NA 28-Feb-2017 2-Mar-2017 B comments
Closed
083 KHEP-CI-0083 Concrete sampling,testing & placement inspection for R.C Foundation Cluster 01 A6 NA 28-Feb-2017 5-Mar-2017 A Approved Closed
088 KHEP-CI-0088 Compaction test - third layer general fill (Zone-1A / C-03) Cluster 03 Zone 1A 1-Mar-2017 4-Mar-2017 A Approved Closed
089 KHEP-CI-0089 Excavated grade Formation checking for cluster NA NA 1-Mar-2017 5-Mar-2017 A Approved Closed
Termite control surface prepareation, istallation & final inspection for
090 KHEP-CI-0090
PC foundation
NA NA 2-Mar-2017 5-Mar-2017 A Approved Closed
Compaction test structural fill first & final layer (Selected fill mm
091 KHEP-CI-0091
thikness)
NA NA 2-Mar-2017 6-Mar-2017 A Approved Closed
092 KHEP-CI-0092 Compaction test Second layer general fill ( Zone-1A- 01) Cluster 01 Zone 1A 2-Mar-2017 5-Mar-2017 A Approved Closed
093 KHEP-CI-0093 Compaction test third layer general fill NA NA 2-Mar-2017 5-Mar-2017 E Rejected Closed
093.1 KHEP-CI-0093-01 Compaction test third layer general fill STA 0+025 0+100 Road 04 Zone 5A 6-Mar-2017 7-Mar-2017 10:00 AM 9-Mar-2017 A Approved Closed
094 KHEP-CI-0094 Inspection Compaction test 5th layer general fill ( Zone-2A- C-05, ) Cluster 05 Zone 1A 4-Mar-2017 6-Mar-2017 A Approved Closed
095 KHEP-CI-0095 Inspection Compaction test 5th layer general fill ( Zone-1A- C-04, ) Cluster 04 Zone 1A 4-Mar-2017 6-Mar-2017 A Approved Closed
097 KHEP-CI-0097 Inspection Compaction test - 4th layer general fill Cluster 06 Zone 2A 5-Mar-2017 6-Mar-2017 1:00 PM 8-Mar-2017 A Approved Closed
098 KHEP-CI-0098 Inspection Compaction test - 4th layer general fill Cluster 07 Zone 3A 5-Mar-2017 6-Mar-2017 1:00 PM 8-Mar-2017 A Approved Closed
099 KHEP-CI-0099 Inspection Compaction test - 3rd layer general fill Cluster 08 Zone 3A 5-Mar-2017 6-Mar-2017 1:00 PM 7-Mar-2017 A Approved Closed
Inspection Compaction test - 1st & final layer structural fill (Selected
100 KHEP-CI-0100
Fill 200mm Thickness)
Cluster 81 A6 Zone 4A 5-Mar-2017 6-Mar-2017 1:00 PM 7-Mar-2017 E Rejected Closed
Inspection Compaction Test 1st & final layer structural fill (Selected
101 KHEP-CI-0100-01
Fill 200mm Thickness)
Cluster 81 A6 Zone 4A 7-Mar-2017 8-Mar-2017 1:00 PM 9-Mar-2017 A Approved Closed
102 KHEP-CI-0102 Inspection test third layer general fill Cluster 01 Zone 1A 6-Mar-2017 7-Mar-2017 1:30 PM 9-Mar-2017 A Approved Closed
Inspection Compaction Test Excavated grade formation checking for Cluster 43 &
103 KHEP-CI-0103
cluster 05 A6
Zone 2A 6-Mar-2017 7-Mar-2017 1:30 PM 11-Mar-2017 A Approved Closed
Installation of reinforcing steel bar, embedded item & form closure Approved w/
104 KHEP-CI-0104
inspection for RC Foundation Axis (D,E,F,G,H,J,K)
Cluster 01 A6 NA 6-Mar-2017 7-Mar-2017 1:30 PM 8-Mar-2017 B comments
Closed
Approved w/
105 KHEP-CI-0105 Cast in place concrete formwork inspection Axis (D,E,F,G,H,J,K) Cluster 01 A6 NA 6-Mar-2017 7-Mar-2017 1:30 PM 8-Mar-2017 B comments
Closed
107 KHEP-CI-0107 Ispection of compaction test 6th layer general fill Cluster 04 Zone 1A 7-Mar-2017 8-Mar-2017 2:30 PM 11-Mar-2017 A Approved Closed
108 KHEP-CI-0108 Ispection of compaction test 6th layer general fill Cluster 05 Zone 2A 7-Mar-2017 8-Mar-2017 2:30 PM 11-Mar-2017 A Approved Closed
Concrete sampling, Testing & Placement Inspection for RC
109 KHEP-CI-0109
Foundation Axis (A,B,C,L,M,N)
Cluster 02 A6 NA 7-Mar-2017 8-Mar-2017 2:30 PM 12-Mar-2017 A Approved Closed
110 KHEP-CI-0110 Cast in place concrete formwordk inspection Axis (A,B,C,L,M,N) Cluster 02 A6 NA 7-Mar-2017 8-Mar-2017 1:30 PM 11-Mar-2017 A Approved Closed
113 KHEP-CI-0113 Formation level around the retention basin no# 02 Basin 02 Zone-5A 7-Mar-2017 8-Mar-2017 2:00 PM 11-Mar-2017 A Approved Closed
Stock file No. Approved w/
114 KHEP-CI-0114 Soil sampling for testing selected fill materials
04
NA 7-Mar-2017 8-Mar-2017 2:00 PM 9-Mar-2017 B comments
Closed
117 KHEP-CI-0117 Cast in place concrete formwork inspection (1) Axis (B,D,F,H,K,M) Cluster 01 A6 NA 8-Mar-2017 9-Mar-2017 10:30 AM 11-Mar-2017 A Approved Closed
120 KHEP-CI-0120 Compaction test 5th layer general fill Cluster 06 Zone 2A 8-Mar-2017 9-Mar-2017 2:00 PM 11-Mar-2017 A Approved Closed
121 KHEP-CI-0121 Compaction test 5th layer general fill Cluster 07 Zone 3A 8-Mar-2017 9-Mar-2017 2:00 PM 11-Mar-2017 A Approved Closed
122 KHEP-CI-0122 Compaction test excavated grade formation checking for cluster Cluster 68 Zone 4B 8-Mar-2017 9-Mar-2017 2:00 PM 11-Mar-2017 A Approved Closed
Compaction test first & final layer structural fill ( 200mm thikness Cluster 05,43
123 KHEP-CI-0123
Selected fill) A6
Zone 2A 9-Mar-2017 11-Mar-2017 2:00 PM 12-Mar-2017 A Approved Closed
Approved w/
125 KHEP-CI-0125 Cast in place concrete formwork inspection Axis (D,E,F,G,H,J,K) Cluster 02 A6 NA 9-Mar-2017 11-Mar-2017 10:30 AM 12-Mar-2017 B comments
Closed
Installation of reinforcing steel bar, embedded item & form closure Approved w/
126 KHEP-CI-0126
inspection for RC Foundation Axis (D,E,F,G,H,J,K)
Cluster 02 A6 NA 9-Mar-2017 11-Mar-2017 11:00 AM 12-Mar-2017 B comments
Closed
129 KHEP-CI-0129 Compaction test 1st layer general fill Basin 02 Zone 5 9-Mar-2017 11-Mar-2017 2:00 PM 13-Mar-2017 A Approved Closed
Compaction test 4th layer general fill (Road no. 04 STA, 0+025-
130 KHEP-CI-0130
0+100)
Road 04 Zone 5A 9-Mar-2017 11-Mar-2017 2:00 PM 12-Mar-2017 A Approved Closed
131 KHEP-CI-0131 Compaction test 4th layer general fill Cluster 01 Zone 1A 9-Mar-2017 11-Mar-2017 2:00 PM 12-Mar-2017 E Rejected Closed
132 KHEP-CI-0131-01 Compaction test 4th layer general fill Cluster 01 Zone 1A 12-Mar-2017 13-Mar-2017 1:30 PM 14-Mar-2017 A Approved Closed
132 KHEP-CI-0132 Compaction test 7th layer general fill Cluster 04 Zone 1A 9-Mar-2017 11-Mar-2017 2:00 PM 12-Mar-2017 A Approved Closed
133 KHEP-CI-0133 Compaction test 7th layer general fill Cluster 05 Zone 2A 9-Mar-2017 11-Mar-2017 2:00 PM 12-Mar-2017 A Approved Closed
134 KHEP-CI-0134 Compaction test 6th layer general fill Cluster 06 Zone 2A 11-Mar-2017 12-Mar-2017 2:30 PM 14-Mar-2017 A Approved Closed
135 KHEP-CI-0135 Compaction test 6th layer general fill Cluster 07 Zone 3A 11-Mar-2017 12-Mar-2017 2:30 PM 14-Mar-2017 A Approved Closed
Cluster 06,44
136 KHEP-CI-0136 Compaction test Formation level
A6
Zone 2A 11-Mar-2017 12-Mar-2017 2:30 PM 14-Mar-2017 A Approved Closed
Cluster 07,45
137 KHEP-CI-0137 Compaction test Formation level Zone 3A 11-Mar-2017 12-Mar-2017 2:30 PM Cancelled Cancelled Cancelled
A6
138 KHEP-CI-0138 Compaction test structural (Selected fill) under foundation Cluster 68 B2 Zone 4B 11-Mar-2017 12-Mar-2017 2:30 PM 13-Mar-2017 E Rejected Closed
139 KHEP-CI-0138-01 Compaction test structural (Selected fill) under foundation Cluster 68 B2 Zone 4B 13-Mar-2017 14-Mar-2017 1:30 PM 15-Mar-2017 A Approved Closed
139 KHEP-CI-0139 Compaction test Formation level Cluster 17 B2 Zone 1B 11-Mar-2017 12-Mar-2017 2:30 PM 13-Mar-2017 E Rejected Closed
140 KHEP-CI-0139-01 Compaction test Formation level Cluster 17 B2 Zone 1B 13-Mar-2017 14-Mar-2017 1:30 PM 15-Mar-2017 A Approved Closed
140 KHEP-CI-0140 Compaction test 8th layer general fill Cluster 04 Zone 1A 12-Mar-2017 13-Mar-2017 1:30 PM 14-Mar-2017 A Approved Closed
141 KHEP-CI-0141 Compaction test 8th layer general fill Cluster 05 Zone 2A 12-Mar-2017 13-Mar-2017 1:30 PM 15-Mar-2017 A Approved Closed
First Coat, Damproofing installation inspection and final inspection for
142 KHEP-CI-0142
foundation & neck column (mokup)
Cluster 69 Zone 4B 12-Mar-2017 13-Mar-2017 8:00 AM 14-Mar-2017 A Approved Closed
148 KHEP-CI-0148 Soil testing & review test report As per Highlighted drwg. NA NA 12-Mar-2017 13-Mar-2017 1:30 PM 14-Mar-2017 A Approved Closed
Second Coat, Damproofing installation inspection and final inspection
149 KHEP-CI-0149
for foundation & neck column (mokup)
Cluster 69 Zone 4B 12-Mar-2017 14-Mar-2017 9:00 AM 15-Mar-2017 A Approved Closed
150 KHEP-CI-0150 Compaction test Formation level Cluster 08 Zone 1B 13-Mar-2017 14-Mar-2017 1:30 PM 15-Mar-2017 A Approved Closed
151 KHEP-CI-0151 Compaction test Formation level Cluster 66 Zone 4A 13-Mar-2017 14-Mar-2017 1:30 PM 15-Mar-2017 A Approved Closed
152 KHEP-CI-0152 Compaction test 5th layer general fill STA, 0+025 to 0+100 ) Road 04 Zone 5A 13-Mar-2017 14-Mar-2017 1:30 PM 15-Mar-2017 A Approved Closed
Concrete sampling, testing and placement inscpection for Exterior
153 KHEP-CI-0153
Reinforced Beam Under Block Wall (MOCKUP)
Cluster 69 Zone 4B 13-Mar-2017 14-Mar-2017 9:00 AM 15-Mar-2017 A Approved Closed
159 KHEP-CI-0159 Compaction test 1st & final layer structural fill Cluster 17 B2 Zone 1B 15-Mar-2017 16-Mar-2017 1:30 PM 18-Mar-2017 A Approved Closed
Approved w/
160 KHEP-CI-0160 Batching plant inspection & trial mix (Concrete Grade 2000PSI OPC) ABNI NA 14-Mar-2017 15-Mar-2017 11:00 AM 29-Mar-2017 B comments
Closed
Approved w/
161 KHEP-CI-0161 Batching plant inspection & trial mix (Concrete Grade 3000PSI OPC) ABNI NA 14-Mar-2017 15-Mar-2017 11:00 AM 29-Mar-2017 B comments
Closed
Approved w/
162 KHEP-CI-0162 Batching plant inspection & trial mix (Concrete Grade 5000PSI OPC) ABNI NA 14-Mar-2017 15-Mar-2017 11:00 AM 29-Mar-2017 B comments
Closed
Batching plant inspection & trial mix (Concrete Grade 5000PSI OPC Approved w/
163 KHEP-CI-0163
+7% MS)
ABNI NA 14-Mar-2017 15-Mar-2017 11:00 AM 29-Mar-2017 B comments
Closed
164 KHEP-CI-0164 Compaction test 9th layer general fill Cluster 05 Zone 2A 14-Mar-2017 15-Mar-2017 1:30 PM 19-Mar-2017 A Approved Closed
165 KHEP-CI-0165 Compaction test 7th layer general fill Cluster 06 Zone 2A 14-Mar-2017 15-Mar-2017 1:30 PM 19-Mar-2017 A Approved Closed
Site Approved w/
166 KHEP-CI-0166 Sampling for Sand Fill
Excavation
Zone 1B 14-Mar-2017 15-Mar-2017 1:30 PM 18-Mar-2017 B comments
Closed
Site
166.1 KHEP-CI-0166-01 Sampling for Sand Fill & review test report
Excavation
Zone 1B 23-Mar-2017 25-Mar-2017 2:30 PM 26-Mar-2017 E Rejected Closed
167 KHEP-CI-0167 Compaction test 2nd layer general fill Along Retention Basin 02 Zone 5A 14-Mar-2017 15-Mar-2017 1:30 PM 19-Mar-2017 A Approved Closed
Concrete sampling, Testing & Placement Inspection for RC Footing
168 KHEP-CI-0168
A6 axis (A,B,C,D,E,F,G)
Cluster 04 A6 NA 15-Mar-2017 16-Mar-2017 10:00 AM 19-Mar-2017 A Approved Closed
179 KHEP-CI-0179 Compaction test excavation level for formation prior to structural fill Cluster 15 B2 Zone 1B 15-Mar-2017 16-Mar-2017 1:30 PM 18-Mar-2017 A Approved Closed
180 KHEP-CI-0180 Compaction test excavation level for formation prior to structural fill Cluster 14 B2 Zone 1B 15-Mar-2017 16-Mar-2017 1:30 PM 18-Mar-2017 A Approved Closed
181 KHEP-CI-0181 Compaction test excavation level for formation prior to structural fill Cluster 07 B2 Zone 1B 15-Mar-2017 16-Mar-2017 1:30 PM 18-Mar-2017 A Approved Closed
182 KHEP-CI-0182 Compaction test 5th layer structural fill Cluster 01 Zone 1A 15-Mar-2017 16-Mar-2017 1:30 PM 18-Mar-2017 A Approved Closed
183 KHEP-CI-0183 Compaction test 1st & final layer structural fill Cluster 08 B2 Zone 1B 15-Mar-2017 16-Mar-2017 1:30 PM 18-Mar-2017 A Approved Closed
Soil sampling testing and review of test report selected fill materials
190 KHEP-CI-0190
STA, 0+025 to 0+100 )
Road 04 Zone 5A 19-Mar-2017 20-Mar-2017 10:30 AM 21-Mar-2017 E Rejected Closed
191 KHEP-CI-0191 Compaction test 6th layer general fill As per Highlighted drwg. NA NA 19-Mar-2017 20-Mar-2017 10:30 AM 21-Mar-2017 A Approved Closed
192 KHEP-CI-0192 Compaction test 6th layer general fill Cluster 01 Zone 1A 19-Mar-2017 20-Mar-2017 10:30 AM 21-Mar-2017 A Approved Closed
193 KHEP-CI-0193 Compaction test 1st and final layer structural fill (selected fill) Cluster 07 Zone 1B 19-Mar-2017 20-Mar-2017 10:30 AM 21-Mar-2017 A Approved Closed
194 KHEP-CI-0194 Compaction test 1st and final layer structural fill (selected fill) Cluster 14 Zone 1B 19-Mar-2017 20-Mar-2017 10:30 AM 21-Mar-2017 A Approved Closed
195 KHEP-CI-0195 Compaction test 1st and final layer structural fill (selected fill) Cluster 15 Zone 1B 19-Mar-2017 20-Mar-2017 10:30 AM 21-Mar-2017 A Approved Closed
Concrete sampling, testing and placement inspection for RC Neck
196 KHEP-CI-0196
Column axis (D,E,F,G,H,J,K,)
Cluster 01 A6 NA 19-Mar-2017 20-Mar-2017 1:30 PM 26-Mar-2017 A Approved Closed
203 KHEP-CI-0203 Compaction test 3rd layer general fill Along Retention Basin 02 Zone 5A 19-Mar-2017 20-Mar-2017 11:00 AM 22-Mar-2017 A Approved Closed
Cast in place concrete formwork inspection for RC Footing axis
204 KHEP-CI-0204
(A,B,C,D,E,F,G,H)
Cluster 43 A6 NA 20-Mar-2017 21-Mar-2017 1:30 PM 22-Mar-2017 A Approved Closed
211 KHEP-CI-0211 Compaction test 8th layer general fill Cluster 06,45 Zone 2A 20-Mar-2017 21-Mar-2017 1:30 PM 22-Mar-2017 A Approved Closed
212 KHEP-CI-0212 Compaction test 1st layer general fill (Under Foundation) Cluster 44 Zone 2A 20-Mar-2017 21-Mar-2017 1:30 PM 22-Mar-2017 E Rejected Closed
212.1 KHEP-CI-0212-01 Compaction test 1st layer general fill (Under Foundation) Cluster 44 Zone 2A 22-Mar-2017 23-Mar-2017 1:30 PM 23-Mar-2017 A Approved Closed
213 KHEP-CI-0213 Compaction test 1st and final layer structural fill (Selected Fill) Cluster 66 Zone 4A 20-Mar-2017 21-Mar-2017 1:30 PM 22-Mar-2017 A Approved Closed
Compaction test 1st general fill around footing (other side) for
214 KHEP-CI-0214
(Mockup)
Cluster 69 Zone 4B 21-Mar-2017 22-Mar-2017 1:30 PM 23-Mar-2017 E Rejected Closed
215 KHEP-CI-0215 Compaction test 7th layer general fill STA, 0+025-STA, 0+100) Road 04 Zone 5A 21-Mar-2017 22-Mar-2017 1:30 PM 23-Mar-2017 E Rejected Closed
215.1 KHEP-CI-0215-01 Compaction test 7th layer general fill STA, 0+025-STA, 0+100) Road 04 Zone 5A 23-Mar-2017 25-Mar-2017 2:30 PM 25-Mar-2017 A Approved Closed
216 KHEP-CI-0216 Compaction test 7th layer general fill Cluster 01 Zone 1A 21-Mar-2017 22-Mar-2017 1:30 PM 23-Mar-2017 A Approved Closed
Compaction test 1st layer general fill around footing (other side) for
217 KHEP-CI-0217
(Mockup)
Cluster 69 Zone 4B 21-Mar-2017 22-Mar-2017 1:30 PM 23-Mar-2017 A Approved Closed
Approved w/
236 KHEP-CI-0236 Compaction test 4th layer general fill Along Retention Basin 02 Zone 5A 22-Mar-2017 23-Mar-2017 1:30 PM 26-Mar-2017 B comments
Closed
237 KHEP-CI-0237 Compaction test excavation level for foundation prior to structural fill Cluster 65 Zone 4A 22-Mar-2017 23-Mar-2017 1:30 PM 23-Mar-2017 A Approved Closed
238 KHEP-CI-0238 Compaction test excavation level for foundation prior to structural fill Cluster 46 Zone 4A 23-Mar-2017 25-Mar-2017 2:30 PM 25-Mar-2017 E Rejected Closed
238.1 KHEP-CI-0238-01 Compaction test excavation level for foundation prior to structural fill Cluster 46 Zone 4A 26-Mar-2017 27-Mar-2017 1:30 PM 28-Mar-2017 A Approved Closed
244 KHEP-CI-0244 Compaction test 1st layer & Final layer structural fill (Selected fill) Cluster 65 Zone 4A 25-Mar-2017 26-Mar-2017 1:30 PM 26-Mar-2017 A Approved Closed
250 KHEP-CI-0250 Compaction test 1st and final layer structural fill Cluster 44 Zone 2A 26-Mar-2017 27-Mar-2017 1:00 PM 28-Mar-2017 A Approved Closed
251 KHEP-CI-0251 Compaction test 8th and final layer structural fill Cluster 01 Zone 1A 26-Mar-2017 27-Mar-2017 1:00 PM 28-Mar-2017 A Approved Closed
Compaction test 8th and final layer structural fill sta, 0+025-STA,
252 KHEP-CI-0252
0+100)
Road 04 Zone 5A 26-Mar-2017 27-Mar-2017 1:00 PM 28-Mar-2017 E Rejected Closed
Compaction test 8th and final layer structural fill sta, 0+025-STA,
252.1 KHEP-CI-0252-01
0+100)
Road 04 Zone 5A 28-Mar-2017 29-Mar-2017 2:00 PM 30-Mar-2017 E Rejected Closed
252.2 KHEP-CI-0252-02 Compaction test 8th layer general fill sta, 0+025-STA, 0+100) Road 04 Zone 5A 30-Mar-2017 1-Apr-2017 10:00 AM 3-Apr-2017 A Approved Closed
257 KHEP-CI-0257 Compaction test 1st and final layer structural fill (selected fill) Cluster 45 Zone 3A 27-Mar-2017 28-Mar-2017 2:00 PM 29-Mar-2017 A Approved Closed
Concrete sampling, testing and placement inspection for RC footing
258 KHEP-CI-0258
axis (A,B,C,D,E)
Cluster 17 B2 NA 27-Mar-2017 28-Mar-2017 1:30 PM 28-Mar-2017 A Approved Closed
267 KHEP-CI-0267 Compaction test 5th layer general fill (selected fill) (Along Retention Basin 02 Zone 5A 28-Mar-2017 29-Mar-2017 2:00 PM 30-Mar-2017 E Rejected Closed
Approved w/
267.1 KHEP-CI-0267-01 Compaction test 5th layer general fill (selected fill) (Along Retention Basin 02 Zone 5A 30-Jan-2017 1-Apr-2017 10:00 AM 2-Apr-2017 B comments
Closed
268 KHEP-CI-0268 Compaction test 1st and final layer structural fill (selected fill) Cluster 46 Zone 3A 28-Mar-2017 29-Mar-2017 2:00 PM 30-Mar-2017 E Rejected Closed
268.1 KHEP-CI-0268-01 Compaction test 1st and final layer structural fill (selected fill) Cluster 46 Zone 3A 30-Jan-2017 1-Apr-2017 10:00 AM 2-Apr-2017 A Approved Closed
Concrete sampling, testing and placement inspection for RC footing
269 KHEP-CI-0269
axis (A,B,C,D,E)
Cluster 08 B2 NA 29-Mar-2017 30-Mar-2017 9:30 AM 30-Mar-2017 A Approved Closed
279 KHEP-CI-0279 Compaction test 1st and final layer structural fill (selected fill) Cluster 06 Zone 1B 30-Mar-2017 1-Apr-2017 1:30 PM 2-Apr-2017 A Approved Closed
Concrete sampling, testing and placement inspection for RC Neck
280 KHEP-CI-0280
Column axis ((A,B,C,D,E,F,G,H,J,K,L,M,N)
Cluster 03 A6 NA 1-Apr-2017 2-Apr-2017 9:30 AM 2-Apr-2017 A Approved Closed
Approved w/
296 KHEP-CI-0296 Compaction test 1st and final layer structural fill (selected fill) Cluster 16 Zone 1B 2-Apr-2017 3-Apr-2017 1:30 PM 4-Apr-2017 B comments
Closed
Compaction test 1st layer general fill Changed to Compaction test for
297 KHEP-CI-0297
existing grade formation
Cluster 05 Zone 1B 2-Apr-2017 3-Apr-2017 1:30 PM 5-Apr-2017 A Approved Closed
312 KHEP-CI-0312 Compaction test 6th layer general fill (Along Retention Basin 02 Zone 5A 3-Apr-2017 4-Apr-2017 1:30 PM 6-Apr-2017 A Approved Closed
313 KHEP-CI-0313 Compaction test 9th layer general fill STA, 0+025 to 0+100)) Road 04 Zone 5A 3-Apr-2017 4-Apr-2017 1:30 PM 6-Apr-2017 A Approved Closed
Approved w/
314 KHEP-CI-0314 Survey Inspection for new bench mark As per Highlighted drwg. NA NA 3-Apr-2017 4-Apr-2017 10:00 AM 6-Apr-2017 B comments
Closed
321 KHEP-CI-0321 Compaction test 1st and final layer structural fill (selected fill) Cluster 72 Zone 4B 4-Apr-2017 5-Apr-2017 9:30 AM 6-Apr-2017 A Approved Closed
322 KHEP-CI-0322 Compaction test 1st and final layer structural fill (selected fill) Cluster 73 Zone 4B 4-Apr-2017 5-Apr-2017 9:30 AM 6-Apr-2017 A Approved Closed
Compaction test & surface preparation of excavation level for
323 KHEP-CI-0323
foundation
Cluster 75 B2 Zone 4B 4-Apr-2017 5-Apr-2017 9:30 AM 6-Apr-2017 A Approved Closed
329 KHEP-CI-0329 Compaction test 1st and final layer structural fill (selected fill) Cluster 05 Zone 1B 5-Apr-2017 6-Apr-2017 3:00 PM 8-Apr-2017 A Approved Closed
Compaction test & surface preparation of excavation level for
330 KHEP-CI-0330
foundation
Cluster 12 Zone 1B 5-Apr-2017 6-Apr-2017 3:00 PM 8-Apr-2017 E Rejected Closed
330.1 KHEP-CI-0330-01 Compaction test at excavated formation level of foundation Cluster 12 Zone 1B 8-Apr-2017 9-Apr-2017 3:00 PM 11-Apr-2017 A Approved Closed
Compaction test & surface preparation of excavation level for
331 KHEP-CI-0331
foundation
Cluster 13 Zone 1B 5-Apr-2017 6-Apr-2017 3:00 PM 4-Apr-2017 A Approved Closed
342 KHEP-CI-0342 Compaction test 1st & final layer structural fill (Selected fill) Cluster 64 Zone 3B 6-Apr-2017 8-Apr-2017 3:00 PM 9-Apr-2017 A Approved Closed
343 KHEP-CI-0343 Compaction test 9th layer general fill STA, 0+025 to 0+100)) Road 04 Zone 5A 6-Apr-2017 8-Apr-2017 3:00 PM 8-Apr-2017 E Rejected Closed
343.1 KHEP-CI-0344 Compaction test 10th layer general fill STA, 0+025 to 0+100 ) Road 04 Zone 5A 8-Apr-2017 9-Apr-2017 3:00 PM 11-Apr-2017 A Approved Closed
344 KHEP-CI-0345 Compaction test 1st & final layer structural fill (Selected fill) Cluster 63 Zone 3B 6-Apr-2017 8-Apr-2017 3:00 PM 9-Apr-2017 A Approved Closed
345 KHEP-CI-0346 Compaction test at excavated formation level of foundation Cluster 10 Zone 1B 6-Apr-2017 8-Apr-2017 3:00 PM 9-Apr-2017 A Approved Closed
346 KHEP-CI-0347 Compaction test at excavated formation level of foundation Cluster 11 Zone 1B 6-Apr-2017 8-Apr-2017 3:00 PM 9-Apr-2017 A Approved Closed
347 KHEP-CI-0348 Compaction test 1st & final layer structural fill(Selected fill) Cluster 75 Zone 4B 6-Apr-2017 8-Apr-2017 2:30 PM 9-Apr-2017 A Approved Closed
348 KHEP-CI-0349 Compaction test & formation existing level Alley 02,11 Zone 1B 6-Apr-2017 8-Apr-2017 2:30 PM 8-Apr-2017 E Rejected Closed
Compaction test & formation existing level (STA,0+025 to 0+0117)
348.1 KHEP-CI-0348-01
(STA,0+75 to 0+1000)
ALLEY 02 Zone 1B 8-Apr-2017 9-Apr-2017 3:00 PM 11-Apr-2017 E Rejected Closed
Zone 1B /
349 KHEP-CI-0349 Compaction test & formation existing level Alley # 12 & NA 6-Apr-2017 8-Apr-2017 2:30 PM 8-Apr-2017 E Rejected Closed
Alley # 13
Zone 1B
(ALLEY No,:
01
(STA,0+025
to 0+100)
ALLEY
349.1 KHEP-CI-0349-01 Compaction test & formation existing level No,: 012 NA 8-Apr-2017 9-Apr-2017 3:00 PM 11-Apr-2017 E Rejected Closed
(STA,0+00 to
0+50)
ALLEY No,:
013
(STA,0+000
to 0+50)
Zone 1B
(ALLEY No,:
01
(STA,0+025
to 0+100)
ALLEY
349.2 KHEP-CI-0349-02 Compaction test & formation existing level No,: 012 NA 11-Apr-2017 12-Apr-2017 3:00 PM 15-Apr-2017 A Approved Closed
(STA,0+00 to
0+50)
ALLEY No,:
013
(STA,0+000
to 0+50)
Termite control surface preparation, installation and final inspection
350 KHEP-CI-0350
for PC foundation As per Highlighted drwg.
Cluster 05 B2 NA 8-Apr-2017 9-Apr-2017 10:30 AM 9-Apr-2017 A Approved Closed
Zone 1B- C-
357 KHEP-CI-0357 Compaction test 1st & final layer structural fill (Selected fill)
13
NA 8-Apr-2017 9-Apr-2017 3:30 PM 10-Apr-2017 A Approved Closed
Zone 4B- C-
358 KHEP-CI-0358 Compaction test 1st & final layer structural fill (Selected fill)
71
NA 8-Apr-2017 9-Apr-2017 3:30 PM 11-Apr-2017 A Approved Closed
Zone 3B- C-
359 KHEP-CI-0359 Compaction test at excavated formation level of foundation
54
NA 8-Apr-2017 9-Apr-2017 3:30 PM 10-Apr-2017 E Rejected Closed
Zone 3B- C-
359.1 KHEP-CI-0359-1 Compaction test of excavated formation level for foundation
54
NA 10-Apr-2017 11-Apr-2017 3:30 PM 12-Apr-2017 A Approved Closed
Zone 3B- C-
360 KHEP-CI-0360 Compaction test at excavated formation level of foundation
58
NA 8-Apr-2017 9-Apr-2017 3:30 PM 10-Apr-2017 A Approved Closed
Zone 1B- C-
361 KHEP-CI-0361 Compaction test at excavated formation level of foundation
20
NA 8-Apr-2017 9-Apr-2017 3:30 PM 11-Apr-2017 E Rejected Closed
Zone 1B- C-
361.1 KHEP-CI-0361-1 Compaction test of excavated formation level for foundation
20
NA 11-Apr-2017 12-Apr-2017 3:30 PM 15-Apr-2017 A Approved Closed
383 KHEP-CI-0383 Damproofing surface preparation for RC foundation & Column neck Cluster 02 A6 NA 9-Apr-2017 10-Apr-2017 2:30 PM 11-Apr-2017 A Approved Closed
Zone 3B / C-
384 KHEP-CI-0384 Compaction test of excavated formation level of foundation
53
NA 9-Apr-2017 10-Apr-2017 2:30 PM 12-Apr-2017 A Approved Closed
Zone 3B / C-
385 KHEP-CI-0385 Compaction test of excavated formation level of foundation
52
NA 9-Apr-2017 10-Apr-2017 2:30 PM 12-Apr-2017 A Approved Closed
Zone 1B / C-
386 KHEP-CI-0386 Compaction test of excavated formation level of foundation
19
NA 9-Apr-2017 10-Apr-2017 2:30 PM 11-Apr-2017 E Rejected Closed
Zone 1B / C-
386.1 KHEP-CI-0386-1 Compaction test of excavated formation level of foundation
19
NA 11-Apr-2017 12-Apr-2017 3:30 PM 15-Apr-2017 A Approved Closed
Zone 1B / C-
387 KHEP-CI-0387 Compaction test 1st and final layer structural fill (selected fill)
10
NA 9-Apr-2017 10-Apr-2017 2:30 PM 11-Apr-2017 A Approved Closed
Zone 1B / C-
388 KHEP-CI-0388 Compaction test 1st and final layer structural fill (selected fill)
11
NA 9-Apr-2017 10-Apr-2017 2:30 PM 11-Apr-2017 A Approved Closed
Zone 3B / C- Approved w/
404 KHEP-CI-404 Compaction test 1st and final layer structural fill (selected fill)
58
NA 10-Apr-2017 11-Apr-2017 3:30 PM 12-Apr-2017 B comments
Closed
Jobsite Stcok
405 KHEP-CI-405 Soil sampling-sweet sand for sand bedding & sand caution
pile
NA 11-Apr-2017 12-Apr-2017 2:30 PM 13-Apr-2017 E Rejected Closed
Jobsite Stcok
405.1 KHEP-CI-405-01 Soil sampling-sweet sand for sand bedding & sand caution
pile
NA 16-Apr-2017 17-Apr-2017 3:30 PM 18-Apr-2017 E Rejected Closed
Soil sampling fine sand for sand bedding & sand caution (From Jobsite Stcok Approved w/
405.2 KHEP-CI-405-02
hamida est. supplier) pile
NA 2-May-2017 3-May-2017 3:00 PM 4-May-2017 B comments
Closed
Jobsite Stcok
406 KHEP-CI-406 Soil sampling-sub base materials
pile
NA 11-Apr-2017 12-Apr-2017 2:30 PM 13-Apr-2017 E Rejected Closed
Jobsite Stcok
406.2 KHEP-CI-406-02 Soil sampling-sub base materials, Grading 2
pile
NA 10-May-2017 11-May-2017 3:00 PM 13-May-2017 E Rejected Closed
Zone 2B / C-
407 KHEP-CI-407 Compaction test of excavated formation level for foundation
27
NA 11-Apr-2017 12-Apr-2017 2:30 PM 15-Apr-2017 A Approved Closed
Zone 2B / C-
408 KHEP-CI-408 Compaction test of excavated formation level for foundation
30
NA 11-Apr-2017 12-Apr-2017 2:30 PM 13-Apr-2017 E Rejected Closed
Zone 2B / C-
408.1 KHEP-CI-408-01 Compaction test of excavated formation level for foundation
30
NA 15-Apr-2017 16-Apr-2017 3:30 PM 17-Apr-2017 A Approved Closed
Zone 1B / C-
409 KHEP-CI-409 Compaction test 1st and final layer structural fill (selected fill)
12
NA 11-Apr-2017 12-Apr-2017 2:30 PM 15-Apr-2017 A Approved Closed
Zone 3B / C-
410 KHEP-CI-410 Compaction test 1st and final layer structural fill (selected fill)
51
NA 11-Apr-2017 12-Apr-2017 2:30 PM 15-Apr-2017 A Approved Closed
Zone 3B / C-
411 KHEP-CI-411 Compaction test 1st and final layer structural fill (selected fill)
52
NA 11-Apr-2017 12-Apr-2017 2:30 PM 15-Apr-2017 A Approved Closed
416 KHEP-CI-416 Damproofing surface preparation for RC foundation & Column neck Cluster 03 A6 NA 11-Apr-2017 12-Apr-2017 2:30 PM 13-Apr-2017 A Approved Closed
Zone 5A
(Road No; 04
418 KHEP-CI-418 Compaction test of 11th layer general fill
0+025-
NA 12-Apr-2017 13-Apr-2017 3:00 PM 15-Apr-2017 E Rejected Closed
0+100)
Zone 5A
(Road No; 04
418.1 KHEP-CI-418-01 Compaction test of 11th layer general fill
0+025-
NA 16-Apr-2017 17-Apr-2017 3:00 PM 18-Apr-2017 A Approved Closed
0+100)
Zone 2B / C-
419 KHEP-CI-419 Compaction test of excavated formation level for foundation
33
NA 12-Apr-2017 13-Apr-2017 3:00 PM 15-Apr-2017 A Approved Closed
Zone 3B / C-
426 KHEP-CI-426 Compaction test 1st and final layer structural fill (selected fill)
54
NA 12-Apr-2017 13-Apr-2017 3:00 PM 13-Apr-2017 E Rejected Closed
Zone 3B / C-
426.1 KHEP-CI-426-01 Compaction test 1st and final layer structural fill (selected fill)
54
NA 15-Apr-2017 16-Apr-2017 3:00 PM 17-Apr-2017 A Approved Closed
Approved w/
436 KHEP-CI-436 Concrete sampling, testing and placement inspection for RC footing Cluster 05 B2 NA 13-Apr-2017 15-Apr-2017 9:30 AM 16-Apr-2017 B comments
Closed
Zone 1B
(ALLEY No,:
02(STA,0+02
5 to 0+117)
437 KHEP-CI-437 Compaction test 1st and final layer general fill
ALLEY No,:
NA 15-Apr-2017 16-Apr-2017 3:00 PM 18-Apr-2017 A Approved Closed
02
(STA,0+75 to
0+100)
Zone 1B
(ALLEY No,:
0(STA,0+025
to 0+100)
ALLEY No,:
438 KHEP-CI-438 Compaction test 1st and final layer general fill 12 NA 15-Apr-2017 16-Apr-2017 3:00 PM 17-Apr-2017 E Rejected Closed
(STA,0+00 to
0+50) ALLEY
No,: 13
(STA,0+00 to
0+50)
Zone 1B
(ALLEY No,:
01(STA,0+02
5 to 0+100)
ALLEY No,:
438.1 KHEP-CI-438-1 Compaction test 1st and final layer general fill 12 NA 19-Apr-2017 20-Apr-2017 3:00 PM 22-Apr-2017 E Rejected Closed
(STA,0+00 to
0+50) ALLEY
No,: 13
(STA,0+00 to
0+50)
Zone 1B
(ALLEY No,:
01(STA,0+02
5 to 0+100)
ALLEY No,:
438.2 KHEP-CI-438-2 Compaction test 1st and final layer general fill 12 NA 22-Apr-2017 23-Apr-2017 11:00 AM 24-Apr-2017 A Approved Closed
(STA,0+00 to
0+50) ALLEY
No,: 13
(STA,0+00 to
0+50)
443 KHEP-CI-443 Concrete sampling, testing and placement inspection for RC footing Cluster 73 B2 NA 15-Apr-2017 16-Apr-2017 9:30 AM 17-Apr-2017 A Approved Closed
Zone 1B / C-
445 KHEP-CI-445 Compaction test 1st and final layer general fill(Selected fill)
19
NA 16-Apr-2017 17-Apr-2017 3:00 PM 18-Apr-2017 A Approved Closed
Zone 1B / C-
446 KHEP-CI-446 Compaction test 1st and final layer general fill(Selected fill)
20
NA 16-Apr-2017 17-Apr-2017 3:00 PM 18-Apr-2017 A Approved Closed
447 KHEP-CI-447 Survey Inspection for new bench mark As per Highlighted drwg. NA NA 16-Apr-2017 17-Apr-2017 3:00 PM 22-Apr-2017 A Approved Closed
457 KHEP-CI-457 Damproofing surface preparation for RC foundation & Column neck Cluster 81 A6 NA 16-Apr-2017 17-Apr-2017 2:30 PM 19-Apr-2017 A Approved Closed
458 KHEP-CI-458 Concrete sampling, testing and placement inspection for RC footing Cluster 13 B2 NA 16-Apr-2017 17-Apr-2017 9:30 AM 17-Apr-2017 A Approved Closed
Zone 2B / C-
460 KHEP-CI-460 Compaction test 1st and final layer general fill(Selected fill)
27
NA 17-Apr-2017 18-Apr-2017 2:00 PM 19-Apr-2017 A Approved Closed
Zone 2B / C-
461 KHEP-CI-461 Compaction test 1st and final layer general fill(Selected fill)
33
NA 17-Apr-2017 18-Apr-2017 2:00 PM 20-Apr-2017 A Approved Closed
462 KHEP-CI-462 Cast in place concrete formwork inspection for RC Column neck Cluster 05 B2 NA 17-Apr-2017 18-Apr-2017 2:30 PM 19-Apr-2017 A Approved Closed
463 KHEP-CI-463 Cast in place concrete formwork inspection for RC Column neck Cluster 11 B2 NA 17-Apr-2017 18-Apr-2017 2:30 PM 19-Apr-2017 A Approved Closed
468 KHEP-CI-468 Concrete sampling, testing and placement inspection for RC Footing Cluster 64 B2 NA 17-Apr-2017 18-Apr-2017 9:30 AM 19-Apr-2017 A Approved Closed
Zone 1B
(ALLEY No,:
02(STA,0+02
5 to 0+117)
469 KHEP-CI-469 Compaction test 1nd layer general fill
ALLEY No,:
NA 17-Apr-2017 18-Apr-2017 3:00 PM 20-Apr-2017 A Approved Closed
02
(STA,0+75 to
0+100)
471 KHEP-CI-471 Cast in place concrete formwork inspection for RC Footing Cluster 71 B2 NA 17-Apr-2017 18-Apr-2017 2:30 PM 19-Apr-2017 A Approved Closed
Road
No:01(sta
473 KHEP-CI-473 Compaction test and Formattion existing level
0+00 to
NA 17-Apr-2017 18-Apr-2017 2:00 PM 20-Apr-2017 A Approved Closed
0+200)
Road
No:05(sta
474 KHEP-CI-474 Compaction test and Formattion existing level
0+00 to
NA 17-Apr-2017 18-Apr-2017 2:00 PM 20-Apr-2017 A Approved Closed
0+200)
Termite control surface preparation, installation and final inspection
475 KHEP-CI-475
for PC foundation
Cluster 19 B2 NA 18-Apr-2017 19-Apr-2017 10:30 AM 20-Apr-2017 A Approved Closed
479 KHEP-CI-479 Cast in place concrete formwork inspection for RC Footing Cluster 12 B2 NA 18-Apr-2017 19-Apr-2017 2:30 PM 20-Apr-2017 A Approved Closed
481 KHEP-CI-481 Cast in place concrete formwork inspection for RC Footing Cluster 75 B2 NA 18-Apr-2017 19-Apr-2017 2:30 PM 20-Apr-2017 A Approved Closed
483 KHEP-CI-483 Cast in place concrete formwork inspection for RC Column Neck Cluster 13 B2 NA 18-Apr-2017 19-Apr-2017 2:30 PM 20-Apr-2017 A Approved Closed
484 KHEP-CI-484 Concrete sampling, testing and placement inspection for RC footing Cluster 63 B2 NA 18-Apr-2017 19-Apr-2017 9:30 AM 20-Apr-2017 A Approved Closed
485 KHEP-CI-485 Concrete sampling, testing and placement inspection for RC footing Cluster 10 B2 NA 18-Apr-2017 19-Apr-2017 9:30 AM 20-Apr-2017 A Approved Closed
Zone 2B / C-
486 KHEP-CI-486 Compaction test 1st and final layer general fill(Selected fill)
30
NA 18-Apr-2017 19-Apr-2017 3:30 PM 20-Apr-2017 A Approved Closed
Zone 2B / C-
487 KHEP-CI-487 Compaction test excavated formation level for foundation
34
NA 18-Apr-2017 19-Apr-2017 3:30 PM 20-Apr-2017 A Approved Closed
Zone 1A / C-
489 KHEP-CI-489 Compaction test 1st layer Around Footing general fill
01
NA 18-Apr-2017 19-Apr-2017 10:00 AM 20-Apr-2017 E Rejected Closed
Zone 1A / C-
490 KHEP-CI-490 Compaction test 1st layer Around Footing general fill
02
NA 18-Apr-2017 19-Apr-2017 10:00 AM 20-Apr-2017 E Rejected Closed
491 KHEP-CI-491 Cast in place concrete formwork inspection for RC Footing Cluster 58 B2 NA 19-Apr-2017 20-Apr-2017 2:30 PM 22-Apr-2017 E Rejected Closed
491.1 KHEP-CI-491-01 Cast in place concrete formwork inspection for RC Footing Cluster 58 B2 NA 22-Apr-2017 23-Apr-2017 10:30 AM 24-Apr-2017 A Approved Closed
494 KHEP-CI-494 Cast in place concrete formwork inspection for RC Column neck Cluster 72 B2 NA 19-Apr-2017 20-Apr-2017 11:00 AM 22-Apr-2017 A Approved Closed
495 KHEP-CI-495 Cast in place concrete formwork inspection for RC Column neck Cluster 73 B2 NA 19-Apr-2017 20-Apr-2017 10:30 AM 22-Apr-2017 A Approved Closed
500 KHEP-CI-500 Damproofing surface preparation for RC foundation & Column neck Cluster 17 B2 NA 19-Apr-2017 20-Apr-2017 10:30 AM 22-Apr-2017 A Approved Closed
501 KHEP-CI-501 Damproofing surface preparation for RC foundation & Column neck Cluster 07 B2 NA 19-Apr-2017 20-Apr-2017 10:30 AM 22-Apr-2017 A Approved Closed
502 KHEP-CI-502 Damproofing surface preparation for RC foundation & Column neck Cluster 08 B2 NA 19-Apr-2017 20-Apr-2017 10:30 AM 22-Apr-2017 A Approved Closed
503 KHEP-CI-503 Concrete sampling, testing and placement inspection for RC footing Cluster 71 B2 NA 19-Apr-2017 20-Apr-2017 9:30 AM 20-Apr-2017 A Approved Closed
Approved w/
505 KHEP-CI-505 Concrete sampling, testing and placement inspection for RC footing Cluster 11 B2 NA 19-Apr-2017 20-Apr-2017 9:30 AM 22-Apr-2017 B comments
Closed
Zone 2B / C-
506 KHEP-CI-506 Compaction test excavated formation level for foundation
35
NA 19-Apr-2017 20-Apr-2017 3:00 PM 22-Apr-2017 E Rejected Closed
Zone 2B / C-
506-1 KHEP-CI-506-01 Compaction test excavated formation level bottom of foundation
35
NA 22-Apr-2017 23-Apr-2017 11:00 AM 24-Apr-2017 E Rejected Closed
Zone 2B / C-
506-2 KHEP-CI-506-02 Compaction test excavated formation level bottom of foundation
35
NA 25-Apr-2017 26-Apr-2017 11:00 AM 27-Apr-2017 E Rejected Closed
Zone 2B / C-
506-3 KHEP-CI-506-03 Compaction test excavated formation level bottom of foundation
35
NA 29-Apr-2017 30-Apr-2017 2:00 PM 2-May-2017 A Approved Closed
508 KHEP-CI-508 Damproofing surface preparation for RC foundation & Column neck Cluster 15 B2 NA 20-Apr-2017 22-Apr-2017 2:30 PM 22-Apr-2017 A Approved Closed
509 KHEP-CI-509 Damproofing surface preparation for RC foundation & Column neck Cluster 05 B2 NA 20-Apr-2017 22-Apr-2017 2:30 PM 24-Apr-2017 A Approved Closed
512 KHEP-CI-512 Cast in place concrete formwork inspection for RC Column neck Cluster 19 B2 NA 20-Apr-2017 22-Apr-2017 2:30 PM 22-Apr-2017 A Approved Closed
514 KHEP-CI-514 Cast in place concrete formwork inspection for RC Footing Cluster 20 B2 NA 20-Apr-2017 22-Apr-2017 2:30 PM 24-Apr-2017 A Approved Closed
516 KHEP-CI-516 Cast in place concrete formwork inspection for RC Footing Cluster 54 B2 NA 20-Apr-2017 22-Apr-2017 2:30 PM 24-Apr-2017 A Approved Closed
518 KHEP-CI-518 Cast in place concrete formwork inspection for RC Column neck Cluster 10 B2 NA 20-Apr-2017 22-Apr-2017 2:30 PM 24-Apr-2017 A Approved Closed
Approved w/
522 KHEP-CI-522 Concrete sampling, testing and placement inspection for RC footing Cluster 12 B2 NA 20-Apr-2017 22-Apr-2017 9:30 AM 22-Apr-2017 B comments
Closed
523 KHEP-CI-523 Cast in place concrete formwork inspection for RC Column neck Cluster 69 B2 NA 20-Apr-2017 22-Apr-2017 2:30 PM 22-Apr-2017 A Approved Closed
Zone 2B / C-
524 KHEP-CI-524 Compaction test 1st and final layer Sturctural fill(Selected fill)
34
NA 20-Apr-2017 22-Apr-2017 3:30 PM 23-Apr-2017 A Approved Closed
Zone 3B / C-
525 KHEP-CI-525 Compaction test Excavated Faomation Level of Foudation
61
NA 20-Apr-2017 22-Apr-2017 3:30 PM 23-Apr-2017 A Approved Closed
Zone 3B / C-
526 KHEP-CI-526 Compaction test Excavated Faomation Level of Foudation
48
NA 20-Apr-2017 22-Apr-2017 3:30 PM 23-Apr-2017 E Rejected Closed
526.1 KHEP-CI-526-01 Compaction test Excavated Formation Level bottom of Foudation Zone 3B, C48 NA 11-May-2017 13-May-2017 2:00 PM 14-May-2017 A Approved Closed
528 KHEP-CI-528 Damproofing surface preparation for RC foundation & Column neck Cluster 14 B2 NA 20-Apr-2017 22-Apr-2017 2:30 PM 23-Apr-2017 A Approved Closed
529 KHEP-CI-529 Concrete sampling, testing and placement inspection for RC footing Cluster 75 B2 NA 22-Apr-2017 23-Apr-2017 9:30 AM 23-Apr-2017 A Approved Closed
Road
No:01(sta
532 KHEP-CI-532 Compaction test 1st layer general fill
0+100 to
NA 22-Apr-2017 23-Apr-2017 2:30 PM 24-Apr-2017 A Approved Closed
0+223)
Installation of reinforcing steel bar, embedded item and form closure
533 KHEP-CI-533
inspection for RC Column Neck axis (G,H,J,K,L,M,N)
Cluster 46 A6 NA 22-Apr-2017 23-Apr-2017 2:30 PM 24-Apr-2017 A Approved Closed
535 KHEP-CI-535 Cast in place concrete formwork inspection for RC Footing Cluster 52 B2 NA 23-Apr-2017 24-Apr-2017 2:30 PM 26-Apr-2017 A Approved Closed
Installation of reinforcing steel bar, embedded item and form closure Approved w/
536 KHEP-CI-536
inspection for RC Footing
Cluster 52 B2 NA 23-Apr-2017 24-Apr-2017 2:30 PM 25-Apr-2017 B comments
Closed
537 KHEP-CI-537 Cast in place concrete formwork inspection for RC Footing Cluster 27 B2 NA 23-Apr-2017 24-Apr-2017 2:30 PM 25-Apr-2017 A Approved Closed
539 KHEP-CI-539 Cast in place concrete formwork inspection for RC Column neck Cluster 11 B2 NA 23-Apr-2017 24-Apr-2017 2:30 PM 26-Apr-2017 A Approved Closed
544 KHEP-CI-544 Concrete sampling, testing and placement inspection for RC footing Cluster 58 B2 NA 23-Apr-2017 24-Apr-2017 9:30 AM 24-Apr-2017 A Approved Closed
545 KHEP-CI-545 Concrete sampling, testing and placement inspection for RC footing Cluster 19 B2 NA 23-Apr-2017 24-Apr-2017 9:30 AM 24-Apr-2017 A Approved Closed
Zone 3B / C-
547 KHEP-CI-547 Compaction test 1st and final layer general fill(Selected fill)
61
NA 23-Apr-2017 24-Apr-2017 3:00 PM 25-Apr-2017 E Rejected Closed
Zone 3B / C-
547.1 KHEP-CI-547-01 Compaction test 1st and final layer general fill(Selected fill)
61
NA 26-Apr-2017 27-Apr-2017 2:00 PM 29-Apr-2017 A Approved Closed
Zone 1B
(ALLEY No,:
02(STA,0+02
5 to 0+117)
548 KHEP-CI-548 Compaction test 3rd layer general fill
ALLEY No,:
NA 23-Apr-2017 24-Apr-2017 3:00 PM 25-Apr-2017 A Approved Closed
11
(STA,0+75 to
0+100)
Zone 1B
(ALLEY No,:
01(STA,0+10
0 to 0+193)
549 KHEP-CI-549 Compaction test & formation existing level
ALLEY No,:
NA 23-Apr-2017 24-Apr-2017 3:00 PM 25-Apr-2017 E Rejected Closed
11
(STA,0+000
to 0+075)
Zone 1B
(ALLEY No,:
01(STA,0+10
0 to 0+193)
549.1 KHEP-CI-549-01 Compaction test & formation existing level
ALLEY No,:
NA 26-Apr-2017 27-Apr-2017 2:00 PM 29-Apr-2017 E Rejected Closed
11
(STA,0+000
to 0+075)
Zone 1B
(ALLEY No,:
01(STA,0+10
0 to 0+193)
Compaction test & formation existing level (excluding road 1
549.2 KHEP-CI-549-02
intersection ALLEY No,:
NA 29-Apr-2017 30-Apr-2017 2:00 PM 1-May-2017 A Approved Closed
11
(STA,0+000
to 0+075)
554 KHEP-CI-554 Concrete sampling, testing and placement inspection for RC footing Cluster 20 B2 NA 24-Apr-2017 25-Apr-2017 9:30 AM 25-Apr-2017 A Approved Closed
555 KHEP-CI-555 Cast in place concrete formwork inspection for RC Footing Cluster 51 B2 NA 24-Apr-2017 25-Apr-2017 2:30 PM 27-Apr-2017 A Approved Closed
557 KHEP-CI-557 Cast in place concrete formwork inspection for RC Footing Cluster 33 B2 NA 24-Apr-2017 25-Apr-2017 2:30 PM 26-Apr-2017 A Approved Closed
Road
No:05(sta
560 KHEP-CI-560 Compaction test 2nd layer general fill
0+150 to
NA 24-Apr-2017 25-Apr-2017 3:00 PM 26-Apr-2017 E Rejected Closed
0+223)
Road
No:05(sta
560.1 KHEP-CI-560-1 Compaction test 2nd layer general fill
0+150 to
NA 27-Apr-2017 29-Apr-2017 3:00 PM 30-Apr-2017 A Approved Closed
0+223)
Approved w/
561 KHEP-CI-561 damproofing surface preparation for RC foundation & Column neck Cluster 04 A6 NA 24-Apr-2017 25-Apr-2017 2:30 PM 26-Apr-2017 B comments
Closed
562 KHEP-CI-562 Second Coat,Damproofing Intallation For RC Footing & Column Neck Cluster 07 B2 NA 25-Apr-2017 26-Apr-2017 10:00 AM 27-Apr-2017 A Approved Closed
563 KHEP-CI-563 Second Coat,Damproofing Intallation For RC Footing & Column Neck Cluster 08 B2 NA 25-Apr-2017 26-Apr-2017 10:00 AM 27-Apr-2017 A Approved Closed
564 KHEP-CI-564 Second Coat,Damproofing Intallation For RC Footing & Column Neck Cluster 17 B2 NA 25-Apr-2017 26-Apr-2017 10:00 AM 27-Apr-2017 A Approved Closed
568 KHEP-CI-568 Concrete sampling, testing and placement inspection for RC footing Cluster 54 B2 NA 25-Apr-2017 26-Apr-2017 9:30 AM 26-Apr-2017 A Approved Closed
570 KHEP-CI-570 Concrete sampling, testing and placement inspection for RC footing Cluster 27 B2 NA 25-Apr-2017 26-Apr-2017 9:30 AM 26-Apr-2017 A Approved Closed
571 KHEP-CI-571 Cast in place concrete formwork inspection for RC Footing Cluster 34 B2 NA 25-Apr-2017 26-Apr-2017 2:30 PM 27-Apr-2017 E Rejected Closed
571.1 KHEP-CI-571-01 Cast in place concrete formwork inspection for RC Footing Cluster 34 B2 NA 29-Apr-2017 30-Apr-2017 2:30 PM 1-May-2017 A Approved Closed
Installation of reinforcing steel bar, embedded item and form closure
572 KHEP-CI-572
inspection for RC Footing
Cluster 34 B2 NA 25-Apr-2017 26-Apr-2017 2:30 PM 27-Apr-2017 E Rejected Closed
Cast in place concrete formwork inspection for RC Column neck axis Approved w/
573 KHEP-CI-573
(A,B,C,D,E,F,G,H,J,K,L,M,N)
Cluster 44 A6 NA 25-Apr-2017 26-Apr-2017 3:00 PM 29-Apr-2017 B comments
Closed
574 KHEP-CI-574 Cast in place concrete formwork inspection for RC Column neck Cluster 12 B2 NA 25-Apr-2017 26-Apr-2017 3:00 PM 27-Apr-2017 A Approved Closed
576 KHEP-CI-576 damproofing surface preparation for RC foundation & Column neck Cluster 68 B2 NA 25-Apr-2017 26-Apr-2017 2:30 PM 27-Apr-2017 A Approved Closed
Zone 1B
Alley 02
(sta,0+050 to
577 KHEP-CI-577 Compaction test 4th layer general fill 0+117) NA 25-Apr-2017 26-Apr-2017 3:00 PM 29-Apr-2017 E Rejected Closed
Alley 11
(sta,0+075 to
0+100)
Zone 1B
Alley 02
(sta,0+050 to
577.1 KHEP-CI-577-01 Compaction test 4th layer general fill 0+117) NA 30-Apr-2017 1-May-2017 3:00 PM 3-May-2017 A Approved Closed
Alley 11
(sta,0+075 to
0+100)
Cast in place concrete formwork inspection for RC Stair (first flight) Approved w/
578 KHEP-CI-578
Mockup
Cluster 69 B2 NA 25-Apr-2017 26-Apr-2017 2:30 PM 29-Apr-2017 B comments
Closed
Zone 2B
Alley 14
579 KHEP-CI-579 Compaction test & formation existing level (sta,0+000 to NA 25-Apr-2017 26-Apr-2017 3:00 PM 26-Apr-2017 A Approved Closed
0+108)
Zone 2B
Alley 06
580 KHEP-CI-580 Compaction test & formation existing level
(sta,0+000 to
NA 25-Apr-2017 26-Apr-2017 3:00 PM 26-Apr-2017 A Approved Closed
0+155)
Installation of reinforcing steel bar, embedded item and form closure Cluster(69)
581 KHEP-CI-581
inspection for RC Stair (first flight) B2 Mockup
NA 25-Apr-2017 26-Apr-2017 2:30 PM 27-Apr-2017 A Approved Closed
Cluster(14)
582 KHEP-CI-582 Second Coat,Damproofing Intallation For RC Footing & Column Neck
B2
NA 26-Apr-2017 27-Apr-2017 10:00 AM 29-Apr-2017 A Approved Closed
Cluster(15)
583 KHEP-CI-583 Second Coat,Damproofing Intallation For RC Footing & Column Neck
B2
NA 26-Apr-2017 27-Apr-2017 10:00 AM 29-Apr-2017 A Approved Closed
584 KHEP-CI-584 Second Coat,Damproofing Intallation For RC Footing & Column Neck Cluster(5) B2 NA 26-Apr-2017 27-Apr-2017 10:00 AM 29-Apr-2017 A Approved Closed
Cluster(52)
585 KHEP-CI-585 Concrete sampling, testing and placement inspection for RC footing
B2
NA 26-Apr-2017 27-Apr-2017 9:30 AM 27-Apr-2017 A Approved Closed
Cluster(33)
586 KHEP-CI-586 Concrete sampling, testing and placement inspection for RC footing
B2
NA 26-Apr-2017 27-Apr-2017 9:30 AM 27-Apr-2017 A Approved Closed
Installation of reinforcing steel bar, embedded item and form closure Cluster(71)
588 KHEP-CI-588
inspection for RC Column Neck B2
NA 26-Apr-2017 27-Apr-2017 2:30 PM 29-Apr-2017 A Approved Closed
Installation of reinforcing steel bar, embedded item and form closure Cluster(75)
589 KHEP-CI-589
inspection for RC Column Neck B2
NA 26-Apr-2017 27-Apr-2017 2:30 PM 29-Apr-2017 A Approved Closed
Cluster(66)
590 KHEP-CI-590 damproofing surface preparation for RC foundation & Column neck A6 axis NA 26-Apr-2017 27-Apr-2017 2:30 PM 30-Apr-2017 A Approved Closed
(H,J,K,L,M,N)
Cluster(65)
A6 axis
592 KHEP-CI-592 Cast in place concrete formwork inspection for RC Column neck (A,B,C,D,E,F, NA 26-Apr-2017 27-Apr-2017 2:30 PM 30-Apr-2017 A Approved Closed
G,H,J,K,L,M,N
)
Cluster(30)
593 KHEP-CI-593 Cast in place concrete formwork inspection for RC Footing
B2
NA 26-Apr-2017 29-Apr-2017 2:30 PM 30-Apr-2017 A Approved Closed
Installation of reinforcing steel bar, embedded item and form closure Cluster(30)
594 KHEP-CI-594
inspection for RC Footing B2
NA 26-Apr-2017 29-Apr-2017 2:30 PM 30-Apr-2017 A Approved Closed
Cluster(63)
595 KHEP-CI-595 Cast in place concrete formwork inspection for RC Column neck
B2
NA 26-Apr-2017 29-Apr-2017 2:30 PM 30-Apr-2017 A Approved Closed
Cluster(64)
596 KHEP-CI-596 Cast in place concrete formwork inspection for RC Column neck
B2
NA 26-Apr-2017 29-Apr-2017 2:30 PM 2-May-2017 A Approved Closed
Installation of reinforcing steel bar, embedded item and form closure Cluster(27)
597 KHEP-CI-597
inspection for RC Column Neck B2
NA 26-Apr-2017 29-Apr-2017 2:30 PM 30-Apr-2017 A Approved Closed
Installation of reinforcing steel bar, embedded item and form closure Cluster(33)
598 KHEP-CI-598
inspection for RC Column Neck B2
NA 26-Apr-2017 29-Apr-2017 2:30 PM 30-Apr-2017 A Approved Closed
Cluster(51) Approved w/
599 KHEP-CI-599 Concrete sampling, testing and placement inspection for RC footing
B2
NA 27-Apr-2017 29-Apr-2017 9:30 AM 30-Apr-2017 B comments
Closed
600 KHEP-CI-600 Compaction test 1ST layer general fill (sta,0+000 to 0+108) Alley 14 NA 27-Apr-2017 29-Apr-2017 3:00 PM 30-Apr-2017 A Approved Closed
Termite control surface preparation, installation and final inspection Cluster(61)
601 KHEP-CI-601
for PC foundation B2
NA 29-Apr-2017 30-Apr-2017 10:30 AM 1-May-2017 A Approved Closed
Cluster(19)
603 KHEP-CI-603 Cast in place concrete formwork inspection for RC Column neck
B2
NA 29-Apr-2017 30-Apr-2017 2:30 PM 2-May-2017 A Approved Closed
Installation of reinforcing steel bar, embedded item and form closure Cluster(45)
604 KHEP-CI-604
inspection for RC Column Neck A6
NA 29-Apr-2017 30-Apr-2017 2:30 PM 1-May-2017 A Approved Closed
Installation of reinforcing steel bar, embedded item and form closure Cluster(58)
605 KHEP-CI-605
inspection for RC Column Neck B2
NA 29-Apr-2017 30-Apr-2017 2:30 PM 1-May-2017 A Approved Closed
Cluster(20)
606 KHEP-CI-606 Cast in place concrete formwork inspection for RC Column neck
B2
NA 29-Apr-2017 30-Apr-2017 2:30 PM 2-May-2017 A Approved Closed
Cluster(66)
A6 axis
607 KHEP-CI-607 damproofing surface preparation for RC foundation & Column neck
(A,B,C,D,E,F,
NA 29-Apr-2017 30-Apr-2017 2:30 PM 30-Apr-2017 A Approved Closed
G)
Cluster(10)
608 KHEP-CI-608 damproofing surface preparation for RC foundation & Column neck
B2
NA 29-Apr-2017 30-Apr-2017 2:30 PM 1-May-2017 A Approved Closed
Cluster(11)
609 KHEP-CI-609 damproofing surface preparation for RC foundation & Column neck
B2
NA 29-Apr-2017 30-Apr-2017 2:30 PM 1-May-2017 A Approved Closed
Cluster(04) Approved w/
610 KHEP-CI-610 Second Coat,Damproofing Intallation For RC Footing & Column Neck
A6
NA 29-Apr-2017 30-Apr-2017 10:00 AM 1-May-2017 B comments
Closed
Concrete sampling, testing and placement inspection for RC stair first Cluster(69)
614 KHEP-CI-614
flight ground floor B2 Mockup
NA 29-Apr-2017 30-Apr-2017 9:30 AM 30-Apr-2017 A Approved Closed
Road
No:05(sta
615 KHEP-CI-615 Compaction test 3rd layer general fill
0+150 to
NA 30-Apr-2017 1-May-2017 3:00 PM 3-May-2017 A Approved Closed
0+223)
Installation of reinforcing steel bar, embedded item and form closure Cluster(51)
616 KHEP-CI-616
inspection for RC Column Neck B2
NA 30-Apr-2017 1-May-2017 2:30 PM 2-May-2017 A Approved Closed
Installation of reinforcing steel bar, embedded item and form closure Cluster(52)
617 KHEP-CI-617
inspection for RC Column Neck B2
NA 30-Apr-2017 1-May-2017 2:30 PM 2-May-2017 A Approved Closed
Installation of reinforcing steel bar, embedded item and form closure Cluster(54)
618 KHEP-CI-618
inspection for RC Column Neck B2
NA 30-Apr-2017 1-May-2017 2:30 PM 3-May-2017 E Rejected Closed
Installation of reinforcing steel bar, embedded item and form closure Cluster(54)
618.1 KHEP-CI-618-01
inspection for RC Column Neck B2
NA 4-May-2017 6-Apr-2017 2:30 PM 7-May-2017 A Approved Closed
Installation of reinforcing steel bar, embedded item and form closure Cluster(34)
619 KHEP-CI-619
inspection for RC Column Neck B2
NA 30-Apr-2017 1-May-2017 2:30 PM 3-May-2017 E Rejected Closed
Installation of reinforcing steel bar, embedded item and form closure Cluster(34)
619.1 KHEP-CI-619-1
inspection for RC Column Neck B2
NA 8-May-2017 9-May-2017 2:30 PM 11-May-2017 A Approved Closed
Cluster(12)
620 KHEP-CI-620 damproofing surface preparation for RC foundation & Column neck
B2
NA 30-Apr-2017 1-May-2017 2:30 PM 2-May-2017 A Approved Closed
Cluster(13)
621 KHEP-CI-621 damproofing surface preparation for RC foundation & Column neck
B2
NA 30-Apr-2017 1-May-2017 2:30 PM 2-May-2017 A Approved Closed
Cluster(34)
622 KHEP-CI-622 Concrete sampling, testing and placement inspection for RC footing
B2
NA 30-Apr-2017 1-May-2017 9:30 AM 2-May-2017 A Approved Closed
Cluster(30)
623 KHEP-CI-623 Concrete sampling, testing and placement inspection for RC footing
B2
NA 30-Apr-2017 1-May-2017 9:30 AM 2-May-2017 A Approved Closed
Cluster(68)
625 KHEP-CI-625 Second Coat,Damproofing Intallation For RC Footing & Column Neck
B2
NA 30-Apr-2017 1-May-2017 10:00 AM 2-May-2017 A Approved Closed
Cluster(6)
626 KHEP-CI-626 Cast in place concrete formwork inspection for RC Footing
BC4
NA 1-May-2017 2-May-2017 2:30 PM 3-May-2017 E Rejected Closed
Cluster(6)
626.1 KHEP-CI-626-01 Cast in place concrete formwork inspection for RC Footing
BC4
NA 4-May-2017 6-May-2017 9:30 AM 7-May-2017 A Approved Closed
Installation of reinforcing steel bar, embedded item and form closure Cluster(6)
627 KHEP-CI-627
inspection for RC Footing BC4
NA 1-May-2017 2-May-2017 2:30 PM 3-May-2017 E Rejected Closed
Installation of reinforcing steel bar, embedded item and form closure Cluster(6)
627 KHEP-CI-627-01
inspection for RC Footing BC4
NA 4-May-2017 6-May-2017 9:30 AM 7-May-2017 A Approved Closed
Cluster(27)
628 KHEP-CI-628 Cast in place concrete formwork inspection for RC Column neck
B2
NA 1-May-2017 2-May-2017 2:30 PM 4-May-2017 A Approved Closed
Cluster(71)
629 KHEP-CI-629 Cast in place concrete formwork inspection for RC Column neck
B2
NA 1-May-2017 2-May-2017 2:30 PM 3-May-2017 A Approved Closed
Cluster(72)
630 KHEP-CI-630 Damproofing surface preparation for RC foundation & Column neck
B2
NA 1-May-2017 2-May-2017 2:30 PM 3-May-2017 A Approved Closed
Cluster(73)
631 KHEP-CI-631 Damproofing surface preparation for RC foundation & Column neck
B2
NA 1-May-2017 2-May-2017 2:30 PM 3-May-2017 A Approved Closed
Zone 1B
Alley 01
(sta,0+100 to
638 KHEP-CI-638 Compaction test 1st layer general fill 0+193) NA 1-May-2017 2-May-2017 3:00 PM 3-May-2017 E Rejected Closed
Alley 11
(sta,0+000 to
0+075)
Zone 1B
Alley 01
(sta,0+100 to
638.1 KHEP-CI-638-01 Compaction test 1st layer general fill 0+193) NA 4-May-2017 6-May-2017 3:00 PM 6-May-2017 A Approved Closed
Alley 11
(sta,0+000 to
0+075)
Compaction test 2nd layer general fill (sta,0+000 to 0+108)
639 KHEP-CI-639
(Excluding cross)
Alley 14 NA 1-May-2017 2-May-2017 3:00 PM 3-May-2017 E Rejected Closed
Jobsite Stcok
Soil sample fine sand for sand bedding & sand caution pile no:07 01-05-2017 02-05-2017 Recall
640 KHEP-CI-640
Sampling fine sand for sand bedding Jobsite Stcok
NA
[Resubmit 04-05-2017]
[Resubmit 06-05-2017]
3:00 PM 2-May-2017 E Rejected
Closed
pile no:07
Cluster(45)
641 KHEP-CI-641 Cast in place concrete formwork inspection for RC Column neck
A6
NA 2-May-2017 3-May-2017 2:30 PM 4-May-2017 A Approved Closed
Cluster(64)
645 KHEP-CI-645 Damproofing surface preparation for RC foundation & Column neck
B2
NA 2-May-2017 3-May-2017 2:30 PM 4-May-2017 E Rejected Closed
Cluster(64)
645.1 KHEP-CI-645-01 Damproofing surface preparation for RC foundation & Column neck
B2
NA 6-May-2017 7-May-2017 2:30 PM 8-May-2017 A Approved Closed
Cluster(2B)
646 KHEP-CI-646 Compaction test 1ST layer general fill(Selected fill)
C35
NA 2-May-2017 3-May-2017 2:00 PM 4-May-2017 A Approved Closed
Zone 1B
Alley 02
(sta,0+050 to
647 KHEP-CI-647 Compaction test 5th layer general fill 0+117) NA 2-May-2017 3-May-2017 3:00 PM 4-May-2017 A Approved Closed
Alley 11
(sta,0+075 to
0+100)
Road
No:05(sta
648 KHEP-CI-648 Compaction test 4th layer general fill
0+150 to
NA 2-May-2017 3-May-2017 3:00 PM 4-May-2017 A Approved Closed
0+223)
Cluster(19)
649 KHEP-CI-649 Damproofing surface preparation for RC foundation & Column neck
B2
NA 3-May-2017 4-May-2017 2:30 PM 7-May-2017 A Approved Closed
Cluster(20)
650 KHEP-CI-650 Damproofing surface preparation for RC foundation & Column neck
B2
NA 3-May-2017 4-May-2017 2:30 PM 7-May-2017 A Approved Closed
Cluster(75)
653 KHEP-CI-653 Cast in place concrete formwork inspection for RC Footing
B2
NA 3-May-2017 4-May-2017 2:30 PM 7-May-2017 A Approved Closed
Cluster(33)
654 KHEP-CI-654 Cast in place concrete formwork inspection for RC Column neck
B2
NA 3-May-2017 4-May-2017 2:30 PM 7-May-2017 A Approved Closed
Cluster(61)
655 KHEP-CI-655 Cast in place concrete formwork inspection for RC Footing
B2
NA 3-May-2017 4-May-2017 2:30 PM 6-May-2017 A Approved Closed
Installation of reinforcing steel bar, embedded item and form closure Cluster(61)
656 KHEP-CI-656
inspection for RC Footing B2
NA 3-May-2017 4-May-2017 2:30 PM 6-May-2017 A Approved Closed
657 KHEP-CI-657 Compaction test & formation existing level (sta,0+000 to 0+117) Alley 04 NA 3-May-2017 4-May-2017 3:00 PM 7-May-2017 A Approved Closed
Zone 1B
658 KHEP-CI-658 Inspection of excavated formation for pipe trench-sewar maine line MH(3-L03) to NA 4-May-2017 6-Apr-2017 3:00 PM 8-May-2017 A Approved Closed
MH (1A-L03)
Cluster(6) Approved w/
660 KHEP-CI-660 Concrete sampling, testing and placement inspection for RC footing
BC4
NA 4-May-2017 6-May-2017 9:30 AM 7-May-2017 B comments
Closed
Cluster(12)
661 KHEP-CI-661 Second Coat,Damproofing Intallation For RC Footing & Column Neck
B2
NA 4-May-2017 6-May-2017 10:00 AM 7-May-2017 A Approved Closed
Cluster(13)
662 KHEP-CI-662 Second Coat,Damproofing Intallation For RC Footing & Column Neck
B2
NA 4-May-2017 6-May-2017 10:00 AM 7-May-2017 A Approved Closed
Cluster(46)
669 KHEP-CI-669 Cast in place concrete formwork inspection for RC Column neck
A6
NA 4-May-2017 6-May-2017 9:30 AM 7-May-2017 A Approved Closed
Cluster(73)
671 KHEP-CI-671 Second Coat,Damproofing Intallation For RC Footing & Column Neck
B2
NA 6-May-2017 7-May-2017 10:00 AM 8-May-2017 A Approved Closed
Cluster(63)
672 KHEP-CI-672 Second Coat,Damproofing Intallation For RC Footing & Column Neck
B2
NA 6-May-2017 7-May-2017 10:00 AM 8-May-2017 A Approved Closed
Cluster(72)
673 KHEP-CI-673 First Coat,Damproofing Intallation For RC Footing & Column Neck
B2
NA 6-May-2017 7-May-2017 10:00 AM 8-May-2017 A Approved Closed
Cluster(64)
674 KHEP-CI-674 First Coat,Damproofing Intallation For RC Footing & Column Neck
B2
NA 6-May-2017 7-May-2017 10:00 AM 8-May-2017 A Approved Closed
Cluster(16)
675 KHEP-CI-675 Cast in place concrete formwork inspection for RC Footing
BC4
NA 6-May-2017 7-May-2017 2:30 PM 8-May-2017 A Approved Closed
Installation of reinforcing steel bar, embedded item and form closure Cluster(16)
676 KHEP-CI-676
inspection for RC footing BC4
NA 6-May-2017 7-May-2017 2:30 PM 8-May-2017 A Approved Closed
Installation of reinforcing steel bar, embedded item and form closure Cluster(61)
677 KHEP-CI-677
inspection for RC Column Neck B2
NA 6-May-2017 7-May-2017 2:30 PM 8-May-2017 A Approved Closed
Cluster(61)
679 KHEP-CI-679 Concrete sampling, testing and placement inspection for RC footing
B2
NA 6-May-2017 7-May-2017 9:30 AM 7-May-2017 A Approved Closed
Cluster(72)
682 KHEP-CI-682 Second Coat,Damproofing Intallation For RC Footing & Column Neck
B2
7-May-2017 8-May-2017 10:00 AM 9-May-2017 A Approved Closed
Cluster(64)
683 KHEP-CI-683 Second Coat,Damproofing Intallation For RC Footing & Column Neck
B2
7-May-2017 8-May-2017 10:00 AM 9-May-2017 A Approved Closed
Cluster(35)
684 KHEP-CI-684 Cast in Place Concrete formwork inspection For RC Footing
B2
7-May-2017 8-May-2017 2:30 PM 10-May-2017 A Approved Closed
Installation of reinforcing steel bar embedded item and form closure Cluster(35)
685 KHEP-CI-685
inspection for RC Footing B2
7-May-2017 8-May-2017 2:30 PM 10-May-2017 A Approved Closed
Cluster(43)
686 KHEP-CI-686 Dam proofing surface Preparation for RC Foundation & Column Neck
A6
7-May-2017 8-May-2017 2:30 PM 9-May-2017 E Rejected Closed
Cluster(43)
686.1 KHEP-CI-686-01 Dam proofing surface Preparation for RC Foundation & Column Neck
A6
21-May-2017 22-May-2017 2:30 PM 23-May-2017 E Rejected Closed
Cluster(54)
687 KHEP-CI-687 Cast in place concrete formwork inspection for RC Column Neck
B2
7-May-2017 8-May-2017 2:30 PM 9-May-2017 A Approved Closed
Road
No:05(sat
689 KHEP-CI-689 Compaction test 5th layer general fill
0+200 to
7-May-2017 8-May-2017 3:00 PM 9-May-2017 A Approved Closed
0+223)
Zone 1B
MH(1A-L03) Approved w/
690 KHEP-CI-690 Inspection of excavated formation for pipe trench-swear Maine line
to MH (5-
7-May-2017 8-May-2017 3:00 PM 9-May-2017 B comments
Closed
L01)
Zone 1B
Approved w/
691 KHEP-CI-691 Inspection of excavated formation for pipe trench-swear Maine line MH(1-L03) to 7-May-2017 8-May-2017 3:00 PM 9-May-2017 B comments
Closed
MH (2-L04)
Zone 1B
Approved w/
692 KHEP-CI-692 Inspection of excavated formation for pipe trench-swear Maine line MH(1-L04) to 7-May-2017 8-May-2017 3:00 PM 9-May-2017 B comments
Closed
MH (2-L05)
Cluster(19)
693 KHEP-CI-693 First Coat,Damproofing Installation For RC Footing & Column Neck
B2
8-May-2017 9-May-2017 10:00 AM 10-May-2017 A Approved Closed
Cluster(20)
694 KHEP-CI-694 First Coat,Damproofing Installation For RC Footing & Column Neck
B2
8-May-2017 9-May-2017 10:00 AM 10-May-2017 A Approved Closed
Installation of reinforcing steel bar embedded item and form closure Cluster(6)
698 KHEP-CI-698
inspection for RC Column BC4
8-May-2017 9-May-2017 2:30 PM 11-May-2017 A Approved Closed
Cluster(44)
699 KHEP-CI-699 Dam proofing surface Preparation for RC Foundation & Column Neck
A6
8-May-2017 9-May-2017 2:30 PM 10-May-2017 E Rejected Closed
699.1 KHEP-CI-699-01 Dam proofing surface Preparation for RC Foundation & Column Neck Cluster 44 A6 14-May-2017 15-May-2017 2:30 PM 16-May-2017 A Approved Closed
Installation of reinforcing steel bar embedded item and form closure Cluster(30)
700 KHEP-CI-700
inspection for RC Column B2
8-May-2017 9-May-2017 2:30 PM 10-May-2017 A Approved Closed
Zone 1B
Approved w/
701 KHEP-CI-701 Compaction test of bedding Under Pipe Trench-Swear Maine Line MH(3-L03) to 8-May-2017 9-May-2017 3:00 PM 10-May-2017 B comments
Closed
MH (1A-L03)
Zone 1B
702 KHEP-CI-702 Inspection of excavated formation for pipe trench-swear Maine line MH(4-L08) to 8-May-2017 9-May-2017 3:00 PM 10-May-2017 A Approved Closed
MH (1-L08)
Zone 1B
703 KHEP-CI-703 Inspection of excavated formation for pipe trench-swear Maine line MH(1-L08) to 8-May-2017 9-May-2017 3:00 PM 10-May-2017 E Rejected Closed
MH (7-L01)
Zone 1B
703.1 KHEP-CI-703-01 Inspection of excavated formation for pipe trench-swear Maine line MH(1-L08) to 11-May-2017 13-May-2017 3:00 PM 15-May-2017 A Approved Closed
MH (7-L01)
Zone 1B
704 KHEP-CI-704 Inspection of excavated formation for pipe trench-swear Maine line MH(1-L07) to 8-May-2017 9-May-2017 3:00 PM 10-May-2017 A Approved Closed
MH (3-L08)
Zone 1B
705 KHEP-CI-705 Inspection of excavated formation for pipe trench-swear Maine line MH(1-L06) to 8-May-2017 9-May-2017 3:00 PM 10-May-2017 A Approved Closed
MH (2-L08)
Cluster(69)
706 KHEP-CI-706 Cast in Place Concrete formwork inspection For RC First Floor Slab
B2-Mockup
8-May-2017 9-May-2017 2:30 PM 11-May-2017 E Rejected Closed
706.1 KHEP-CI-706-01 Cast in Place Concrete formwork inspection For RC First Floor Slab Cluster 69 B2 14-May-2017 15-May-2017 2:30 PM 18-May-2017 A Approved Closed
Installation of reinforcing steel bar embedded item and form closure Cluster(69)
707 KHEP-CI-707
inspection for RC First Floor Slab B2-Mockup
8-May-2017 9-May-2017 2:30 PM 11-May-2017 E Rejected Closed
Installation of reinforcing steel bar embedded item and form closure Cluster(69)
707.1 KHEP-CI-707-01
inspection for RC First Floor Slab B2-Mockup
13-May-2017 14-May-2017 2:30 PM 15-May-2017 E Rejected Closed
Installation of reinforcing steel bar embedded item and form closure Cluster(69)
707.2 KHEP-CI-707-02
inspection for RC First Floor Slab B2-Mockup
16-May-2017 17-May-2017 10:30 AM 18-May-2017 A Approved Closed
Cluster(16)
708 KHEP-CI-708 Concrete sampling, testing and placement inspection for RC Footing
BC4
9-May-2017 10-May-2017 9:30 AM 10-May-2017 A Approved Closed
Cluster(19)
709 KHEP-CI-709 Second Coat,Damproofing Installation For RC Footing & Column Neck
B2
9-May-2017 10-May-2017 10:00 AM 11-May-2017 A Approved Closed
Cluster(20)
710 KHEP-CI-710 Second Coat,Damproofing Installation For RC Footing & Column Neck
B2
9-May-2017 10-May-2017 10:00 AM 11-May-2017 A Approved Closed
Cluster(51)
711 KHEP-CI-711 Cast in place concrete formwork inspection for RC Column neck
B2
9-May-2017 10-May-2017 2:30 PM 11-May-2017 A Approved Closed
Cluster(52)
712 KHEP-CI-712 Cast in place concrete formwork inspection for RC Column neck
B2
9-May-2017 10-May-2017 2:30 PM 11-May-2017 A Approved Closed
Termite control surface preparation, installation and final inspection Cluster(17) 09-05-2017
713 KHEP-CI-713
for PC grad beam B2 09-05-2017-Recall
10-May-2017 10:30 AM 13-May-2017 E Rejected Closed
Blinding concrete sampling, testing & placement inspection for grad Cluster(17) 09-05-2017
714 KHEP-CI-714
beam B2 09-05-2017-Recall
10-May-2017 1:30 PM 13-May-2017 E Rejected Closed
Installation of reinforcing steel bar embedded item and form closure Cluster(16) Approved w/
717 KHEP-CI-717
inspection for RC Column Neck BC4
9-May-2017 10-May-2017 2:30 PM 11-May-2017 B comments
Closed
Zone 1B
718 KHEP-CI-718 Compaction Test of Bedding Under Pipe Trench-Swear Maine Line MH(1-L03) to 9-May-2017 10-May-2017 3:00 PM 11-May-2017 A Approved Closed
MH (5-L01)
Zone 1B
719 KHEP-CI-719 Compaction Test of Bedding Under Pipe Trench-Swear Maine Line MH(1-L03) to 9-May-2017 10-May-2017 3:00 PM 11-May-2017 A Approved Closed
MH (2-L04)
Zone 1B
720 KHEP-CI-720 Compaction Test of Bedding Under Pipe Trench-Swear Maine Line MH(1-L04) to 9-May-2017 10-May-2017 3:00 PM 11-May-2017 A Approved Closed
MH (2-L05)
Plate Load Bearing test Excavated Formation Level Bottom of Zone 2B/ C- Approved w/
721 KHEP-CI-721
Foundation 31
9-May-2017 10-May-2017 2:00 PM 10-May-2017 B comments
Closed
Zone 3B/ C-
Plate Load Bearing test Excavated Formation Level Bottom of Approved w/
722 KHEP-CI-722
Foundation
48 9-May-2017 10-May-2017 2:00 PM 10-May-2017 B comments
Closed
Zone 1A
723 KHEP-CI-723 Survey verification for excavated retention basin (Pond Areas) 10-05-2017 11-05-2017 11-May-2017 10:00 AM RECALLED
(Pond-01)
Survey verification for excavated materials quantity survey cut and
724 KHEP-CI-724
fill report by (Falcon) Area Office,
Pond 3,5 Zone A 13-05-17 14-05-2017 9:00 AM 15-May-2017 E Rejected Closed
Cast in place concrete formwork inspection for RC Stair (Second Cluster 69,
725 KHEP-CI-725
flight) B2 ( Mockup)
10-May-2017 11-May-2017 11:00 AM 18-May-2017 A Approved Closed
Installation of reinforcing steel bar embedded item and form closure Cluster 69,
726 KHEP-CI-726
inspection for RC Stair(Second flight) B2 ( Mockup)
10-May-2017 11-May-2017 10:30 AM 13-May-2017 A Approved Closed
First Coat, Damproofing Installation Inspection For RC Footing & Cluster 66,
727 KHEP-CI-727
Column Neck A6
10-May-2017 11-May-2017 10:00 AM 13-May-2017 A Approved Closed
728 KHEP-CI-728 Concrete sampling, testing and placement inspection for RC Footing Cluster 35, B2 10-May-2017 11-May-2017 9:30 AM 13-May-2017 A Approved Closed
730 KHEP-CI-730 Cast in place concrete formwork inspection for RC Column neck Cluster 30, B2 10-May-2017 11-May-2017 2:30 PM 13-May-2017 A Approved Closed
731 KHEP-CI-731 Cast in place concrete formwork inspection for RC Column neck Cluster 34, B2 10-May-2017 11-May-2017 2:30 PM 13-May-2017 A Approved Closed
Zone 1B
732 KHEP-CI-732 Compaction test of bedding Under Pipe Trench-Swear Maine Line MH(1-L07) to 10-May-2017 11-May-2017 10:00 AM 13-May-2017 A Approved Closed
MH (3-L08)
Zone 1B
733 KHEP-CI-733 Compaction test of bedding Under Pipe Trench-Swear Maine Line MH(1-L06) to 10-May-2017 11-May-2017 10:00 AM 13-May-2017 A Approved Closed
MH (2-L08)
Zone 1B
734 KHEP-CI-734 Compaction test of bedding Under Pipe Trench-Swear Maine Line MH(1-L08) to 10-May-2017 11-May-2017 10:00 AM 13-May-2017 A Approved Closed
MH (1-L08)
Road
No:01(sta
0+000 to
735 KHEP-CI-735 Compaction test 2nd layer (final backfilling) general fill 0+200) 10-May-2017 13-May-2017 3:00 PM 14-May-2017 E Rejected Closed
(excluding
road 2
intersection)
Road
No:01(sta
0+000 to
735.1 KHEP-CI-735-01 Compaction test 2nd layer (final backfilling) general fill 0+200) 16-May-2017 17-May-2017 3:00 PM 20-May-2017 A Approved Closed
(excluding
road 2
intersection)
Second Coat, Damproofing Intallation Inspection For RC Footing & Cluster 66,
738 KHEP-CI-738
Column Neck A6
11-May-2017 13-May-2017 10:00 AM 14-May-2017 A Approved Closed
740 KHEP-CI-740 Cast in place concrete formwork inspection for RC Grad Beam Cluster 01 A6 NA 11-May-2017 13-May-2017 10:30 AM 14-May-2017 E Rejected Closed
740.1 KHEP-CI-740-01 Cast in place concrete Form work inspection for RC Grad Beam Cluster 01 A6 NA 17-May-2017 18-May-2017 10:30 AM 20-May-2017 A Approved Closed
745 KHEP-CI-745 Cast in place concrete formwork inspection for RC Column neck Cluster 61, B2 13-May-2017 14-May-2017 2:30 PM 15-May-2017 A Approved Closed
Zone 1B
746 KHEP-CI-746 Compaction test of bedding Under Pipe Trench-Swear Maine Line MH(1-L08) to 13-May-2017 14-May-2017 3:00 PM 15-May-2017 E Rejected Closed
MH (7-L01)
Zone 1B
746.1 KHEP-CI-746-01 Compaction test of bedding Under Pipe Trench-Swear Maine Line MH(1-L08) to 16-May-2017 17-May-2017 3:00 PM 17-May-2017 A Approved Closed
MH (7-L01)
First Coat, Damproofing Installation Inspection For RC Footing & Cluster 44,
748 KHEP-CI-748
Column Neck A6
13-May-2017 14-May-2017 10:00 AM 15-May-2017 E Rejected Closed
First Coat, Damproofing Installation Inspection For RC Footing & Cluster 44,
748.1 KHEP-CI-748-01
Column Neck A6
16-May-2017 17-May-2017 10:30 AM 17-May-2017 A Approved Closed
Jobsite Stock
749 KHEP-CI-749 Sampling- Aggregate sub base materials
Pile 8
14-May-2017 15-May-2017 3:00 PM 15-May-2017 E Rejected Closed
Jobsite Stock
749.1 KHEP-CI-749-01 Sampling- Aggregate sub base materials
Pile 8
18-May-2017 20-May-2017 3:00 PM 21-May-2017 E Rejected Closed
Jobsite Approved w/
749.2 KHEP-CI-749-02 Sampling- Aggregate sub base materials
StockPile 8
22-May-2017 23-May-2017 10:00 AM 24-May-2017 B comments
Closed
Zone 1B / C-
750 KHEP-CI-750 Compaction Test excavated formation level bottom of foundation
09
14-May-2017 15-May-2017 2:00 PM 16-May-2017 A Approved Closed
Cluster 45,
751 KHEP-CI-751 Dam proofing surface Preparation for RC Foundation & Column Neck
A6
14-May-2017 15-May-2017 2:30 PM 16-May-2017 A Approved Closed
Cluster 65,
752 KHEP-CI-752 Dam proofing surface Preparation for RC Foundation & Column Neck
A6
14-May-2017 15-May-2017 2:30 PM 15-May-2017 A Approved Closed
First Coat, Damproofing Installation Inspection for RC footing & Cluster 45,
760 KHEP-CI-760
column neck A6
15-May-2017 16-May-2017 2:30 PM 17-May-2017 A Approved Closed
Zone 1B /
761 KHEP-CI-761 Compaction test 1st and final layer structural fill(Selected fill)
C21 (BC-4)
15-May-2017 16-May-2017 2:00 PM 17-May-2017 A Approved Closed
Zone 4B /
762 KHEP-CI-762 Compaction test excavated formation level bottom of Foundation
C79 (BC-4)
15-May-2017 16-May-2017 3:00 PM 17-May-2017 A Approved Closed
Second Coat, Damproofing Intallation Inspection For RC Footing & Cluster 45,
763 KHEP-CI-763
Column Neck A6
16-May-2017 17-May-2017 2:30 PM 18-May-2017 A Approved Closed
765 KHEP-CI-765 Cast in Place Concrete formwork inspection For RC Footing Cluster 48, B2 16-May-2017 17-May-2017 2:30 PM 18-May-2017 A Approved Closed
767 KHEP-CI-767 Cast in Place Concrete formwork inspection For RC Footing Cluster 31, B2 16-May-2017 17-May-2017 3:00 PM 17-May-2017 A Approved Closed
769 KHEP-CI-769 Cast in Place Concrete formwork inspection For RC Column Neck Cluster 35, B2 16-May-2017 17-May-2017 3:00 PM 18-May-2017 A Approved Closed
Cluster 46,
770 KHEP-CI-770 Dam proofing surface Preparation for RC Foundation & Column Neck
A6
16-May-2017 17-May-2017 2:30 PM 17-May-2017 A Approved Closed
First Coat, Damproofing Installation Inspection for RC footing & Cluster 65,
774 KHEP-CI-774
column neck A6
16-May-2017 17-May-2017 2:30 PM 21-May-2017 E Rejected Closed
First Coat, Damp Proofing Installation Inspection for RC Footing & Cluster 65,
774.1 KHEP-CI-774-01
column neck A6
22-May-2017 23-May-2017 2:30 PM 24-May-2017 E Rejected Closed
First Coat, Damp Proofing Installation Inspection for RC Footing & Cluster 65,
774.2 KHEP-CI-774-02
column neck A6
27-May-2017 28-May-2017 9:00 AM 28-May-2017 A Approved Closed
Zone 4B /
775 KHEP-CI-775 Compaction test excavated formation level bottom of Foundation Cluster 78 16-May-2017 17-May-2017 3:00 PM 21-May-2017 E Rejected Closed
(BC-4)
Zone 4B,
775.1 KHEP-CI-775-01 Compaction test excavated formation level bottom of Foundation Cluster 78 BC 3-Jun-2017 4-Jun-2017 9:00 AM 5-Jun-2017 A Approved Closed
4
Main Line:
From MH3-
L03~MH2-
L03
Length(12.1M
) Main
Line: From
MH2-
L03~MH1-
L03
Length(34.46
776 KHEP-CI-776 Installation of Sanitary Sewer uPVC pipes 200mm, Class 4 M) Main 16-May-2017 17-May-2017 10:00 AM 18-May-2017 E Rejected Closed
Line: From
MH1-
L03~MH1A-
L03
Length(16.44
m) Main Line:
From MH1A-
L03~MH5-
L01
Length(25.42
M)
Main Line:
From MH3-
L03~MH2-
L03
Length(12.1M
) Main
Line: From
MH2-
L03~MH1-
L03
Length(34.46
Approved w/
776.1 KHEP-CI-776-01 Installation of Sanitary Sewer uPVC pipes 200mm, Class 4 M) Main 18-May-2017 20-May-2017 10:00 AM 21-May-2017 B comments
Closed
Line: From
MH1-
L03~MH1A-
L03
Length(16.44
m) Main Line:
From MH1A-
L03~MH5-
L01
Length(25.42
M)
Main Line:
From MH1-
L03~MH1-
L04
Length(22.6M
) Main
777 KHEP-CI-777 Installation of Sanitary Sewer uPVC pipes 200mm, Class 4
Line: From
16-May-2017 17-May-2017 10:00 AM 18-May-2017 E Rejected Closed
MH1-
L04~MH2-
L04
Length(23.12
M)
Main Line:
From MH1-
L03~MH1-
L04
Length(22.6M
) Main Approved w/
777.1 KHEP-CI-777-01 Installation of Sanitary Sewer uPVC pipes 200mm, Class 4
Line: From
18-May-2017 20-May-2017 10:00 AM 22-May-2017 B comments
Closed
MH1-
L04~MH2-
L04
Length(23.12
M)
Main Line:
From MH1-
L04~MH1-
L05
Length(5.9M)
778 KHEP-CI-778 Installation of Sanitary Sewer uPVC pipes 200mm, Class 4 Main Line: 16-May-2017 17-May-2017 10:00 AM 18-May-2017 E Rejected Closed
From MH1-
L05~MH2-
L05
Length(17.13
M)
Main Line:
From MH1-
L04~MH1-
L05
Length(5.9M)
Approved w/
778.1 KHEP-CI-778-01 Installation of Sanitary Sewer uPVC pipes 200mm, Class 4 Main Line: 18-May-2017 20-May-2017 10:00 AM 22-May-2017 B comments
Closed
From MH1-
L05~MH2-
L05
Length(17.13
M)
Second Coat, Dam proofing Installation Inspection For RC Footing & Cluster 44, Approved w/
779 KHEP-CI-779
Column Neck A6
17-May-2017 18-May-2017 10:30 AM 20-May-2017 B comments
Closed
Second Coat, Dam proofing Installation Inspection For RC Footing & Cluster 65,
780 KHEP-CI-780
Column Neck A6
17-May-2017 18-May-2017 2:30 PM 20-May-2017 E Rejected Closed
Second Coat, Damp Proofing Installation Inspection For RC Footing & Cluster 65,
780.1 KHEP-CI-780-1
Column Neck A6
23-May-2017 24-May-2017 10:30 AM 24-May-2017 E Rejected Closed
Second Coat, Damp Proofing Installation Inspection For RC Footing & Cluster 65,
780.2 KHEP-CI-780-2
Column Neck A6
28-May-2017 29-May-2017 9:30 AM 30-May-2017 A Approved Closed
Termite control surface preparation, installation and final inspection Cluster 21,
781 KHEP-CI-781
for PC foundation BC4
17-May-2017 18-May-2017 10:30 AM 20-May-2017 A Approved Closed
Blinding concrete sampling, testing & placement inspection for Cluster 21,
782 KHEP-CI-782
Footing BC4
17-May-2017 18-May-2017 1:30 PM 20-May-2017 A Approved Closed
783 KHEP-CI-783 Dam proofing surface Preparation for RC Foundation & Column Neck Cluster 71, B2 17-May-2017 18-May-2017 2:30 PM 20-May-2017 A Approved Closed
Zone 1B /
786 KHEP-CI-786 Compaction test 1st and final layer structural fill(Selected fill) Cluster-09 17-May-2017 18-May-2017 3:00 PM 21-May-2017 A Approved Closed
(BC-4)
Zone 1B Line
(34)
787 KHEP-CI-787 Inspection of excavated formation for pipe trench-swear Maine line
MH(2-L34) to
17-May-2017 18-May-2017 3:00 PM 20-May-2017 A Approved Closed
MH (1A-L34)
Zone 1B Line
(08) Approved w/
788 KHEP-CI-788 Inspection of Sand Filling Around pipe - swear Maine line
MH(4-L08) to
17-May-2017 18-May-2017 3:00 PM 21-May-2017 B comments
Closed
MH (3-L08)
Main Line:
From MH1-
L07 ~ MH3-
Approved w/
789 KHEP-CI-789 Inspection of Leak Test for Sanitary uPVC Pipes 200mm - Class 4 L08 Main 17-May-2017 18-May-2017 11:00 AM 20-May-2017 B comments
Closed
Line: From
MH1-L06 ~
MH2-L08
Main Line:
From MH3-
L08 ~ MH2-
Approved w/
790 KHEP-CI-790 Inspection of Leak Test for Sanitary uPVC Pipes 200mm - Class 4 L08 Main 17-May-2017 18-May-2017 11:00 AM 20-May-2017 B comments
Closed
Line: From
MH2-L08 ~
MH1-L08
Zone 1B Line
(34)
791 KHEP-CI-791 Inspection of excavated formation for pipe trench-swear Maine line MH(1A-L34) 17-May-2017 18-May-2017 3:00 PM 20-May-2017 A Approved Closed
to MH (7-
L02)
Concrete sampling, testing and placement inspection for RC Grad
792 KHEP-CI-792
Beam
Cluster 01 A6 NA 18-May-2017 20-May-2017 9:30 AM 20-May-2017 A Approved Closed
797 KHEP-CI-797 Dam proofing surface Preparation for RC Foundation & Column Neck Cluster 51, B2 18-May-2017 20-May-2017 2:30 PM 22-May-2017 A Approved Closed
798 KHEP-CI-798 Dam proofing surface Preparation for RC Foundation & Column Neck Cluster 52, B2 18-May-2017 20-May-2017 2:30 PM 21-May-2017 A Approved Closed
799 KHEP-CI-799 Concrete sampling, testing and placement inspection for RC Footing Cluster 48, B2 18-May-2017 20-May-2017 9:30 AM 20-May-2017 A Approved Closed
Main Line:
From MH1-
800 KHEP-CI-800 Installation of Sanitary Sewer uPVC pipes 200mm, Class 4 L08 ~ MH7- 18-May-2017 20-May-2017 2:30 PM 22-May-2017 A Approved Closed
L01 Length
(21.15m)
Zone 1B Line
(33)
801 KHEP-CI-801 Inspection of excavated formation for pipe trench-swear Maine line
MH(1-L34) to
18-May-2017 20-May-2017 3:00 PM 21-May-2017 A Approved Closed
MH (7-L33)
Zone 4B /
802 KHEP-CI-802 Compaction test 1st and final layer structural fill(Selected fill) Cluster-79 18-May-2017 20-May-2017 3:00 PM 22-May-2017 A Approved Closed
(BC-4)
Road No:05
(sta 0+200 to
0+223)
803 KHEP-CI-803 Compaction test 6th layer (Final back filling) General Fill
(excluding
18-May-2017 20-May-2017 3:00 PM 21-May-2017 A Approved Closed
road 2
intersection)
Cluster 21,
804 KHEP-CI-804 Cast in Place Concrete formwork inspection For RC Footing
BC4
20-May-2017 21-May-2017 2:30 PM 22-May-2017 A Approved Closed
Installation of reinforcing steel bar embedded item and form closure Cluster 21,
805 KHEP-CI-805
inspection for RC Footing BC4
20-May-2017 21-May-2017 2:30 PM 22-May-2017 A Approved Closed
First Coat, Dam proofing Installation Inspection for RC footing & Cluster 46,
809 KHEP-CI-809
column neck A6
20-May-2017 21-May-2017 2:30 PM 22-May-2017 A Approved Closed
Cluster 69,
Installation of reinforcing steel bar embedded item and form closure
810 KHEP-CI-810
inspection for RC Column (First Floor)
B2 20-May-2017 21-May-2017 2:30 PM 22-May-2017 A Approved Closed
( Mockup)
Cluster 69,
Concrete sampling, testing and placement inspection for RC First
811 KHEP-CI-811
Floor Slab & 2nd Flight Stair
B2 20-May-2017 21-May-2017 9:30 AM 21-May-2017 A Approved Closed
( Mockup)
812 KHEP-CI-812 Concrete sampling, testing and placement inspection for RC Footing Cluster 31, B2 20-May-2017 21-May-2017 9:30 AM 21-May-2017 A Approved Closed
Zone 1B Line
(08)
814 KHEP-CI-814 Inspection of Sand Bedding Around pipe - swear Maine line
MH(3-L08) to
20-May-2017 21-May-2017 3:00 PM 21-May-2017 A Approved Closed
MH (1-L08)
Zone 1B
MH(1-L07) to
MH (3-L08)
815 KHEP-CI-815 Inspection of Sand Bedding Around pipe - swear Maine line Line (07) 20-May-2017 21-May-2017 3:00 PM 21-May-2017 A Approved Closed
MH(1-L06) to
MH (2-L08)
Line (06)
Zone 1B Line
Compaction test of Sand Bedding Under Pipe Trench - Swear Maine (34)
816 KHEP-CI-816
Line MH(2-L34) to
20-May-2017 21-May-2017 3:00 PM 21-May-2017 A Approved Closed
MH (7-L02)
Second Coat, Dam proofing installation inspection for RC Footing & Cluster 46,
819 KHEP-CI-819
Column Neck A6
21-May-2017 22-May-2017 2:30 PM 23-May-2017 A Approved Closed
Termite control surface preparation, installation & final inspection for Cluster 79,
820 KHEP-CI-820
PC Foundation BC4
21-May-2017 22-May-2017 10:30 AM 23-May-2017 A Approved Closed
Blinding concrete sampling, testing & placement inspection for Cluster 79,
821 KHEP-CI-821
Footing BC4
21-May-2017 22-May-2017 1:30 PM 24-May-2017 A Approved Closed
822 KHEP-CI-822 Cast in Place Concrete form work inspection For RC Column Neck Cluster 58, B2 21-May-2017 22-May-2017 2:30 PM 23-May-2017 A Approved Closed
823 KHEP-CI-823 Dam proofing surface Preparation for RC Foundation & Column Neck Cluster 30, B2 21-May-2017 22-May-2017 2:30 PM 23-May-2017 A Approved Closed
824 KHEP-CI-824 Dam proofing surface Preparation for RC Foundation & Column Neck Cluster 27, B2 21-May-2017 22-May-2017 2:30 PM 23-May-2017 A Approved Closed
Zone 1B Line
(33)
MH(1-L33) to
Compaction test of Sand Bedding Under Pipe Trench - Swear Maine
826 KHEP-CI-826
Line
MH (A1-L33) 21-May-2017 22-May-2017 3:00 PM 23-May-2017 A Approved Closed
MH(A1-L33)
to MH (A1-
L34)
Zone 1B Line
Compaction test of Sand Bedding Under Pipe Trench - Swear Maine (08)
827 KHEP-CI-827
Line MH(4-L08) to
21-May-2017 22-May-2017 3:00 PM 23-May-2017 E Rejected Closed
MH (1-L08)
Zone 1B Line
Compaction test of Sand Bedding Under Pipe Trench - Swear Maine (08) Approved w/
827.1 KHEP-CI-827-01
Line MH(4-L08) to
5-Jun-2017 6-Jun-2017 10:00 AM 8-Jun-2017 B comments
Closed
MH (1-L08)
Zone 1B Line
(7 and 6)
Compaction test of Sand Bedding Under Pipe Trench - Swear Maine MH(1-L07) to
828 KHEP-CI-828
Line MH (3-L08)
21-May-2017 22-May-2017 3:00 PM 23-May-2017 E Rejected Closed
MH(1-L06) to
MH (2-L08)
Zone 1B Line
(7 and 6)
Compaction test of Sand Bedding Under Pipe Trench - Swear Maine MH(1-L07) to Approved w/
828.1 KHEP-CI-828-01
Line MH (3-L08)
5-Jun-2017 6-Jun-2017 10:00 AM 8-Jun-2017 B comments
Closed
MH(1-L06) to
MH (2-L08)
Zone 4B,
833 KHEP-CI-833 Compaction test 1st and final layer structural fill(Selected fill) Cluster 78 22-May-2017 23-May-2017 3:00 PM 25-May-2017 A Approved Closed
(BC-4)
Compaction test 2nd layer General fill (sta,0+025 to 0+117)
834 KHEP-CI-834
(excluding Road 2 intersection)
Alley 04 NA 22-May-2017 23-May-2017 3:00 PM 24-May-2017 A Approved Closed
Maine Line
MH (1-L03)
to MH (A1-
L03) Line 3
MH (2-L04) Approved w/
838 KHEP-CI-838 Inspection of Sand Filling Around pipe - swear Maine line
to MH (A1-
22-May-2017 23-May-2017 3:00 PM 24-May-2017 B comments
Closed
L04) Line 4
MH (1-L04)
to MH (A1-
L03) Line 4
Maine Line
MH (2-L05)
to MH (1-
L05) Line 5 Approved w/
839 KHEP-CI-839 Inspection of Sand Filling Around pipe - swear Maine line
MH (1-
22-May-2017 23-May-2017 3:00 PM 24-May-2017 B comments
Closed
L05) to MH
(1-L04) Line
5
Zone 1B Line
15
MH(52-L15)
840 KHEP-CI-840 Inspection of Excavated Formation for Pipe Trench Storm Maine Line to MH (54- 22-May-2017 23-May-2017 3:00 PM 24-May-2017 E Rejected Closed
L15) MH(54-
L15) to MH
(57-L15)
Zone 1B Line
15
MH(52-L15)
840.1 KHEP-CI-840-01 Inspection of Excavated Formation for Pipe Trench Storm Maine Line to MH (54- 25-May-2017 27-May-2017 10:00 AM 27-May-2017 A Approved Closed
L15) MH(54-
L15) to MH
(57-L15)
Second Coat, Damp Proofing Installation Inspection For RC Footing &
841 KHEP-CI-841
Column Neck
Cluster 51, B2 23-May-2017 24-May-2017 2:30 PM 25-May-2017 A Approved Closed
Cast in Place Concrete form work inspection For RC Column Neck Cluster 16 Approved w/
843 KHEP-CI-843
Excluding Grid Line (B-6) & (H-7) BC4
NA 23-May-2017 24-May-2017 3:00 PM 25-May-2017 B comments
Closed
Cluster 9,
844 KHEP-CI-844 Cast in Place Concrete form work inspection For RC Column Neck
BC4
23-May-2017 24-May-2017 2:30 PM 25-May-2017 A Approved Closed
Installation of reinforcing steel bar embedded item and form closure Cluster 9,
845 KHEP-CI-845
inspection for RC Footing BC4
23-May-2017 24-May-2017 2:30 PM 25-May-2017 A Approved Closed
Cluster 21,
847 KHEP-CI-847 Concrete sampling, testing and placement inspection for RC Footing
BC4
23-May-2017 24-May-2017 9:30 AM 24-May-2017 A Approved Closed
Zone 1B Line
7
MH(19-L07)
848 KHEP-CI-848 Inspection of excavated formation for pipe trench - Storm Maine line to MH (20- 23-May-2017 24-May-2017 10:00 AM 25-May-2017 A Approved Closed
L07) MH(20-
L07) to MH
(27-L07)
MH (3-L03)
to MH (2-
L03) Line 3
MH (2-L03)
to MH (1-
849 KHEP-CI-849 Inspection of Sand Filling Around pipe - swear Maine line
L03) Line 3
23-May-2017 24-May-2017 10:30 AM 25-May-2017 A Approved Closed
MH (A1-
L03) to MH
(5-L01) Line
3
MH (1-L08)
850 KHEP-CI-850 Inspection of Sand Filling Around pipe - swear Maine line to MH (7- 23-May-2017 24-May-2017 1:30 PM 25-May-2017 A Approved Closed
L01) Line 8
Compaction test 1st layer General fill (sta,0+000 to 0+200)
851 KHEP-CI-851
(excluding Road 1 and 4 intersection)
Alley 05 NA 23-May-2017 24-May-2017 2:00 PM 25-May-2017 A Approved Closed
Zone 1B Line
15
MH(57-L15)
Compaction test of Sand Bedding Under Pipe Trench - Swear Maine
853 KHEP-CI-853
Line
to MH (54- 25-May-2017 27-May-2017 11:30 AM 28-May-2017 A Approved Closed
L15) MH(54-
L15) to MH
(52-L15)
Second Coat, Damp Proofing Installation Inspection for RC footing &
854 KHEP-CI-854
column neck
Cluster 51, B2 24-May-2017 25-May-2017 1:30 PM 27-May-2017 A Approved Closed
MH (2-L34)
to MH (1-
L34) Line 34
MH (1-L34)
865 KHEP-CI-865 Inspection of Sand Filling Around pipe - swear Maine line to MH (A1- 24-May-2017 25-May-2017 1:30 PM 27-May-2017 A Approved Closed
L34) Line 34
MH (A1-L34)
to MH (7-
L02) Line 34
Zone 4B,
866 KHEP-CI-866 Compaction test Excavated Formation Level Bottom of Foundation Cluster 23, 24-May-2017 25-May-2017 3:00 PM 27-May-2017 E Rejected Closed
BC 4
Zone 4B,
866.1 KHEP-CI-866-01 Compaction test Excavated Formation Level Bottom of Foundation Cluster 23, 30-May-2017 31-May-2017 3:00 PM 3-Jun-2017 A Approved Closed
BC 4
Zone 2B,
867 KHEP-CI-867 Compaction test Excavated Formation Level Bottom of Foundation Cluster 24, 24-May-2017 25-May-2017 2:30 PM 27-May-2017 E Rejected Closed
BC 4
Zone 2B,
867 KHEP-CI-867-01 Compaction test Excavated Formation Level Bottom of Foundation Cluster 24, 28-May-2017 29-May-2017 10:30 AM 30-May-2017 A Approved Closed
BC 4
Zone 1B Line
7
MH(28-L07)
to MH (29-
868 KHEP-CI-868 Inspection of excavated formation for pipe trench - Storm Maine line
L07)
24-May-2017 25-May-2017 11:00 AM 27-May-2017 E Rejected Closed
MH(A29-L07)
to MH (30-
L04)
Concrete sampling, Testing and placement inspection for RC Column Cluster 69, B
870 KHEP-CI-870
(Filst Floor) 2 (Mockup)
25-May-2017 27-May-2017 9:30 AM 27-May-2017 A Approved Closed
Damp Proofing surface Preparation for RC Foundation & Column Cluster 34, B Approved w/
871 KHEP-CI-871
Neck 2
25-May-2017 27-May-2017 9:00 AM 28-May-2017 B comments
Closed
First Coat, Damp Proofing Installation Inspection for RC footing & Cluster 27, B Approved w/
872 KHEP-CI-872
column neck 2
25-May-2017 28-May-2017 9:30 AM 28-May-2017 B comments
Closed
First Coat, Damp Proofing Installation Inspection for RC footing & Cluster 30, B Approved w/
873 KHEP-CI-873
column neck 2
25-May-2017 27-May-2017 9:00 AM 28-May-2017 B comments
Closed
First Coat, Damp Proofing Installation Inspection for Cmu, Mortar Approved w/
874 KHEP-CI-874
and Masonry Inspection Under Exterior Reinforced G.B
Cluster 10 B2 NA 25-May-2017 28-May-2017 9:00 AM 28-May-2017 B comments
Closed
First Coat, Damp Proofing Installation Inspection for Cmu, Mortar Approved w/
875 KHEP-CI-875
and Masonry Inspection Under Exterior Reinforced G.B
Cluster 5, B 2 25-May-2017 28-May-2017 9:30 AM 28-May-2017 B comments
Closed
Termite control surface preparation, installation and final inspection Cluster 78,
876 KHEP-CI-876
for PC foundation BC 4
25-May-2017 27-May-2017 9:30 AM 28-May-2017 A Approved Closed
Blinding concrete sampling, Testing & placement inspection for Cluster 78,
877 KHEP-CI-877
Footing BC 4
25-May-2017 27-May-2017 10:30 PM 30-May-2017 A Approved Closed
Installation of reinforcing steel bar embedded item and form closure Cluster 9, BC
878 KHEP-CI-878
inspection for RC Column Neck 4
25-May-2017 27-May-2017 8:30 AM 27-May-2017 A Approved Closed
Installation of reinforcing steel bar embedded item and form closure Cluster 21,
879 KHEP-CI-879
inspection for RC Column Neck BC 4
25-May-2017 27-May-2017 9:00 AM 27-May-2017 A Approved Closed
MH (19-L07)
to MH (20-
Compaction test of Sand Bedding Under Pipe Trench - Storm Maine L07) Line 7
880 KHEP-CI-880
Line MH (20-L07)
25-May-2017 27-May-2017 10:30 AM 28-May-2017 A Approved Closed
to MH (27-
L07) Line 7
MH (1-L33)
to MH (1-
L33) Line 33
881 KHEP-CI-881 Inspection of Sand Filling Around pipe - swear Maine line
MH (1A-L33)
25-May-2017 27-May-2017 9:30 AM 27-May-2017 A Approved Closed
to MH (1-
L34) Line 33
Cast in Place Concrete form work inspection For RC Column Neck Cluster 6, BC
882 KHEP-CI-882
Grid Line (B - 6 & H - 6) 4
25-May-2017 27-May-2017 8:00 AM 27-May-2017 A Approved Closed
Zone 1B Line
31
MH(9-L02) to
883 KHEP-CI-883 Inspection of excavated formation for pipe trench - Storm Maine line MH(A1-L31) 27-May-2017 28-May-2017 11:00 AM 28-May-2017 E Rejected Closed
MH(A1-L31)
to MH (1-
L31)
Zone 1B Line
31
MH(9-L02) to
883.1 KHEP-CI-883-01 Inspection of excavated formation for pipe trench - Storm Maine line MH(A1-L31) 29-May-2017 30-May-2017 10:00 AM 31-May-2017 A Approved Closed
MH(A1-L31)
to MH (1-
L31)
Cluster 9, BC
884 KHEP-CI-884 Concrete sampling, testing and placement inspection for RC Footing
4
27-May-2017 28-May-2017 9:30 AM 28-May-2017 A Approved Closed
Concrete sampling, testing and placement inspection for RC Column Cluster 58, B
885 KHEP-CI-885
neck 2
27-May-2017 28-May-2017 10:00 AM 28-May-2017 A Approved Closed
Installation of reinforcing steel bar embedded item and form closure Cluster 79,
887 KHEP-CI-887
inspection for RC Footing BC 4
28-May-2017 29-May-2017 10:00 AM 30-May-2017 A Approved Closed
Cluster 79,
889 KHEP-CI-889 Cast in Place Concrete form work inspection For RC Footing
BC 4
28-May-2017 29-May-2017 10:30 AM 30-May-2017 A Approved Closed
890 KHEP-CI-890 Cast in place concrete Form work inspection for RC Grad Beam Cluster 02 A6 NA 29-May-2017 30-May-2017 10:30 AM 30-May-2017 A Approved Closed
Cluster 48, B
891 KHEP-CI-891 Cast in place concrete Form work inspection for RC Column Neck
2
29-May-2017 30-May-2017 9:30 AM 30-May-2017 A Approved Closed
Zone 1B Line
31
MH(1-L31) to
892 KHEP-CI-892 Inspection of excavated formation for pipe trench - Swear Maine line
MH(2-L31)
29-May-2017 30-May-2017 11:00 AM 31-May-2017 A Approved Closed
MH(1-L31) to
MH (1-L32)
Road 3
(sta,0+300 to
0+425)
893 KHEP-CI-893 Compaction test and Formation Existing Level
(excluding
29-May-2017 30-May-2017 9:30 AM 1-Jun-2017 E Rejected Closed
Road 2
intersection)
Road 3
(sta,0+300 to
0+425)
893.1 KHEP-CI-893-01 Compaction test and Formation Existing Level
(excluding
4-Jun-2017 5-Jun-2017 11:30 AM 6-Jun-2017 A Approved Closed
Road 2
intersection)
Second Coat, Damp Proofing Installation Inspection for RC Footing Cluster 30, B
895 KHEP-CI-895
& column neck 2
30-May-2017 31-May-2017 9:00 AM 1-Jun-2017 A Approved Closed
Second Coat, Damp Proofing Installation Inspection for RC Footing Cluster 27, B
899 KHEP-CI-899
& column neck 2
30-May-2017 31-May-2017 8:30 AM 1-Jun-2017 A Approved Closed
40cm, CMU, Mortar and Masonry Inspection Under Exterior Cluster 81,
900 KHEP-CI-900
Reinforced G.B A6
30-May-2017 1-Jun-2017 10:00 AM 3-Jun-2017 E Rejected Closed
40cm, CMU, Mortar and Masonry Inspection Under Exterior Cluster 81,
900.1 KHEP-CI-900-01
Reinforced G.B A6
7-Jun-2017 8-Jun-2017 10:00 AM 8-Jun-2017 A Approved Closed
MH (3-L31)
to MH (2-
L31) and MH
(2-L31) to
MH (1-L31)
Line 31 MH
Compaction test of Sand Bedding Under Pipe Trench - Swear Maine (1-L31) to
901 KHEP-CI-901
Line MH (A1-L31)
30-May-2017 31-May-2017 10:30 AM 1-Jun-2017 E Rejected Closed
and MH (A1-
L31) to MH
(9-L02) Line
31 MH (1-L32
to MH (1-
L31) Line 32
MH (3-L31)
to MH (2-
L31) and MH
(2-L31) to
MH (1-L31)
Line 31 MH
Compaction test of Sand Bedding Under Pipe Trench - Swaer Maine (1-L31) to
901.1 KHEP-CI-901-01
Line MH (A1-L31)
3-Jun-2017 4-Jun-2017 10:30 AM 4-Jun-2017 A Approved Closed
and MH (A1-
L31) to MH
(9-L02) Line
31 MH (1-L32
to MH (1-
L31) Line 32
MH (28-L07)
to MH (29-
L07) Line 7
MH (28-L07)
Compaction test of Sand Bedding Under Pipe Trench - Storm Maine to MH (29A-
902 KHEP-CI-902
Line L07) Line 7
30-May-2017 31-May-2017 10:30 AM 3-Jun-2017 A Approved Closed
MH (29A-
L07) to MH
(30-L04) Line
7
Cast in place concrete Form work inspection for RC Column Axis Approved w/
907 KHEP-CI-907
(H,J,K,L,M,N)
Cluster 01 A6 NA 31-May-2017 1-Jun-2017 10:00 AM 3-Jun-2017 B comments
Closed
Zone 2B,
908 KHEP-CI-908 Compaction test 1st and final layer structural fill (selected fill) Cluster 24, 31-May-2017 1-Jun-2017 10:00 AM 1-Jun-2017 E Rejected Closed
BC 4
Zone 2B,
908.1 KHEP-CI-908-01 Compaction test 1st and final layer structural fill (selected fill) Cluster 24, 3-Jun-2017 4-Jun-2017 10:00 AM 5-Jun-2017 A Approved Closed
BC 4
Cluster 79,
909 KHEP-CI-909 Concrete sampling, testing and placement inspection for RC Footing
BC4
1-Jun-2017 3-Jun-2017 9:30 AM 3-Jun-2017 A Approved Closed
First Coat, Damp Proofing Installation Inspection for RC Footing & Cluster 43,
911 KHEP-CI-911
column neck A6
1-Jun-2017 3-Jun-2017 10:00 AM 3-Jun-2017 A Approved Closed
Zone 1B Line
15
912 KHEP-CI-912 Inspection of excavated formation for pipe trench - Storm Maine line MH(46-L15) 1-Jun-2017 3-Jun-2017 11:00 AM 4-Jun-2017 A Approved Closed
to MH(47-
L15)
MH(19-L07)
to MH(20-
L07) Line 7 Approved w/
913 KHEP-CI-913 Inspection of Sand Filling Around pipe - Storm Maine line
MH(20-L07)
1-Jun-2017 3-Jun-2017 9:30 AM 4-Jun-2017 B comments
Closed
to MH(27-
L07) Line 7
Installation of reinforcing steel bar embedded item and form closure
914 KHEP-CI-914
inspection for RC Column Ground Floor
Cluster 02 A6 NA 1-Jun-2017 3-Jun-2017 10:00 AM 5-Jun-2017 E Rejected Closed
Installation of reinforcing steel bar embedded item and form closure Approved w/
914.1 KHEP-CI-914-01
inspection for RC Column Ground Floor
Cluster 02 A6 NA 10-Jun-2017 11-Jun-2017 10:00 AM 12-Jun-2017 B comments
Closed
Zone 1B Line
15
Compaction test of Sand Bedding Under Pipe Trench - Storm Maine
921 KHEP-CI-921
Line
MH(46-L15) 3-Jun-2017 4-Jun-2017 11:00 AM 6-Jun-2017 A Approved Closed
to MH(47-
L15)
Compaction test 3rd layer General fill (sta,0+100 to 0+155)
922 KHEP-CI-922
(excluding Road 2 intersection)
Alley 06 NA 4-Jun-2017 5-Jun-2017 10:00 AM 6-Jun-2017 A Approved Closed
923 KHEP-CI-923 Compaction test 1st layer General fill (sta,0+100 to 0+225) Alley 08 NA 4-Jun-2017 5-Jun-2017 10:15 AM 6-Jun-2017 A Approved Closed
Second Coat, Damp Proofing Installation Inspection for RC Footing Cluster 43,
924 KHEP-CI-924
& column neck A6
4-Jun-2017 5-Jun-2017 9:00 AM 6-Jun-2017 A Approved Closed
Termite control surface preparation, installation and final inspection Cluster 24,
926 KHEP-CI-926
for PC footing BC4
4-Jun-2017 5-Jun-2017 10:30 AM 6-Jun-2017 A Approved Closed
Blinding concrete sampling, Testing & placement inspection for Cluster 24,
927 KHEP-CI-927
Footing BC4
4-Jun-2017 5-Jun-2017 11:00 AM 6-Jun-2017 A Approved Closed
Installation of reinforcing steel bar embedded item and form closure Cluster 79,
928 KHEP-CI-928
inspection for RC Column Neck BC4
4-Jun-2017 5-Jun-2017 9:30 AM 6-Jun-2017 A Approved Closed
Cluster 78,
932 KHEP-CI-932 Cast in Place Concrete form work inspection For RC Footing
BC4
5-Jun-2017 6-Jun-2017 10:00 AM 6-Jun-2017 A Approved Closed
Installation of reinforcing steel bar embedded item and form closure Cluster 78,
933 KHEP-CI-933
inspection for RC Footing BC4
5-Jun-2017 6-Jun-2017 9:30 AM 6-Jun-2017 A Approved Closed
Cast in Place Concrete form work inspection For RC Column Axis Approved w/
934 KHEP-CI-934
(H,J2,J4,L6,N1,N4) (Ground floor)
Cluster 01 A6 NA 5-Jun-2017 6-Jun-2017 10:00 AM 6-Jun-2017 B comments
Closed
Zone 1B Line
Compaction test of Sand Filling Above the pipe trench and laying 8 Approved w/
936 KHEP-CI-936
warning tape Swear Maine Line MH(1-L08) to
5-Jun-2017 6-Jun-2017 10:00 AM 8-Jun-2017 B comments
Closed
MH(7-L01)
Zone 1B Line
3, 4 & 5
MH(31-L03)
to MH(A1-
L03) and
Compaction test of Sand Filling Above the pipe trench and laying MH(A1-L03) Approved w/
937 KHEP-CI-937
warning tape Swear Maine Line to MH(5-L01)
5-Jun-2017 6-Jun-2017 10:00 AM 8-Jun-2017 B comments
Closed
MH(2-L04) to
MH(1-L03)
and MH(2-
L05) to
MH(1-L04)
Line 15
MH(52-L15)
to MH(54-
938 KHEP-CI-938 Inspection of Sand Filling Around pipe - Storm Maine line
L15) MH(54-
5-Jun-2017 6-Jun-2017 9:30 AM 8-Jun-2017 A Approved Closed
L15)to
MH(57-L15)
Compaction test 5th layer General fill (sta,0+100 to 0+114)
939 KHEP-CI-939
(excluding Road 2 intersection)
Alley 04 NA 5-Jun-2017 6-Jun-2017 10:00 AM 7-Jun-2017 A Approved Closed
Road 3
(sta,0+300 to
0+425)
940 KHEP-CI-940 Compaction test 1st layer General fill
(excluding
6-Jun-2017 7-Jun-2017 9:30 AM 8-Jun-2017 A Approved Closed
Road 2
intersection)
Zone 1B Line
34
MH(2-L34) to
MH(1-L34)
Compaction test of Sand Filling Above the pipe trench and laying
942 KHEP-CI-942
warning tape Swear Maine Line
and MH(1- 6-Jun-2017 7-Jun-2017 10:00 AM 8-Jun-2017 E Rejected Closed
L34) to
MH(A1-L34)
MH(A1-L34)
to MH(7-L02)
Line 34
MH(2-L34) to
MH(1-L34)
Compaction test of Sand Filling Above the pipe trench and laying and MH(1-
942.1 KHEP-CI-942-01
warning tape Swear Maine Line L34) to
11-Jun-2017 12-Jun-2017 9:00 AM 13-Jun-2017 A Approved Closed
MH(A1-L34)
MH(A1-L34)
to MH(7-L02)
Zone 1B Line
7
MH(19-L07)
Compaction test of Sand Filling Above the pipe trench and laying to MH(20- Approved w/
943 KHEP-CI-943
warning tape Storm Maine Line L07) and
6-Jun-2017 7-Jun-2017 10:00 AM 8-Jun-2017 B comments
Closed
MH(20-L07)
to MH(27-
L07)
Zone 1B Line
33
MH(1-L33) to
Compaction test of Sand Filling Above the pipe trench and laying
944 KHEP-CI-944
warning tape Swear Maine Line
MH(A1-L33) 6-Jun-2017 7-Jun-2017 10:00 AM 8-Jun-2017 E Rejected Closed
and MH(A1-
L33) to
MH(1-L33)
Line 33
MH(1-L33) to
Compaction test of Sand Filling Above the pipe trench and laying MH(A1-L33) Approved w/
944.1 KHEP-CI-944-01
warning tape Swear Maine Line and MH(A1-
11-Jun-2017 12-Jun-2017 9:30 AM 13-Jun-2017 B comments
Closed
L33) to
MH(1-L33)
Zone 1B Line
27
MH(108-L27)
to MH(110A-
945 KHEP-CI-945 Inspection of excavated formation for pipe trench - Storm Maine line
L27) and
6-Jun-2017 7-Jun-2017 11:00 AM 8-Jun-2017 E Rejected Closed
MH(110A-
L27) to
MH(111-L27)
Line 27
MH(108-L27)
to MH(110A-
945.1 KHEP-CI-945-01 Inspection of excavated formation for pipe trench - Storm Maine line L27) and 11-Jun-2017 12-Jun-2017 10:00 AM 13-Jun-2017 E Rejected Closed
MH(110A-
L27) to
MH(111-L27)
Zone 1B Line
27
MH(108-L27)
to MH(110A-
945.2 KHEP-CI-945-02 Inspection of excavated formation for pipe trench - Storm Maine line
L27) and
14-Jun-2017 15-Jun-2017 9:00 AM 17-Jun-2017 A Approved Closed
MH(110A-
L27) to
MH(111-L27)
Zone 1B Line
27
MH(111-L27)
to MH(111a-
946 KHEP-CI-946 Inspection of excavated formation for pipe trench - Storm Maine line
L27) and
6-Jun-2017 7-Jun-2017 11:00 AM 8-Jun-2017 E Rejected Closed
MH(111a-
L27) to
MH(114-L27)
Line 27
MH(111-L27)
to MH(111a-
Compaction test of Excavated Formation for Pipe Trench Storm Main
946.1 KHEP-CI-946-01
Line
L27) and 11-Jun-2017 12-Jun-2017 10:30 AM 13-Jun-2017 E Rejected Closed
MH(111a-
L27) to
MH(114-L27)
Zone 1B Line
27
MH(111-L27)
to MH(111a-
946.2 KHEP-CI-946-02 Inspection of excavated formation for pipe trench - Storm Maine line
L27) and
14-Jun-2017 15-Jun-2017 9:30 AM 17-Jun-2017 A Approved Closed
MH(111a-
L27) to
MH(114-L27)
Line 7
MH(29-L07)
to MH(29a-
952 KHEP-CI-952 Inspection of Sand Filling Around Storm Maine line (800m) L07) and 7-Jun-2017 8-Jun-2017 11:00 AM 10-Jun-2017 A Approved Closed
MH(29a-L07)
to MH(30-
L04)
Second Coat, Damp Proofing Installation Inspection for RC Footing
953 KHEP-CI-953
& column neck Grid Line (A & B)
Cluster 4, A6 10-Jun-2017 11-Jun-2017 9:00 AM 12-Jun-2017 A Approved Closed
Cluster 78,
955 KHEP-CI-955 Concrete sampling, testing and placement inspection for RC Footing
BC4
10-Jun-2017 11-Jun-2017 8:00 AM 12-Jun-2017 A Approved Closed
Line 1
MH(21-L01)
to MH(20-
957 KHEP-CI-957 Excavated Formation of Pipe - Trench Swear Main Line L01) and 10-Jun-2017 11-Jun-2017 9:30 AM 12-Jun-2017 A Approved Closed
MH(20-L01)
to MH(19-
L01)
Line 1
MH(17-L01)
to MH(16-
Approved w/
958 KHEP-CI-958 Excavated Formation of Pipe - Trench Swear Main Line L01) and 10-Jun-2017 11-Jun-2017 9:30 AM 12-Jun-2017 B comments
Closed
MH(16-L01)
to MH(15-
L01)
Line 1
MH(19-L01)
to MH(18-
959 KHEP-CI-959 Excavated Formation of Pipe - Trench Swear Main Line L01) and 10-Jun-2017 11-Jun-2017 9:30 AM 12-Jun-2017 E Rejected Closed
MH(18-L01)
to MH(17-
L01)
Line 1
MH(17-L01)
to MH(16-
959.1 KHEP-CI-959-01 Inspection of Excavated Formation of Pipe - Trench Swear Main Line L01) and 17-Jun-2017 18-Jun-2017 10:30 AM 19-Jun-2017 A Approved Closed
MH(16-L01)
to MH(15-
L01)
Line 15
MH(52-L15)
to MH(54-
Compaction test of Sand Filling Above the pipe trench and laying
960 KHEP-CI-960
warning tape Storm Maine Line
L15) and 10-Jun-2017 11-Jun-2017 9:30 AM 12-Jun-2017 A Approved Closed
MH(54-L15)
to MH(57-
L15)
Line 15
MH(46-L15)
961 KHEP-CI-961 Inspection of Sand Filling Around Storm Maine line
to MH(47-
10-Jun-2017 11-Jun-2017 9:30 AM 12-Jun-2017 A Approved Closed
L15)
Damp Proofing surface Preparation for RC Foundation & Column Cluster 16
962 KHEP-CI-962
Neck BC4
NA 10-Jun-2017 11-Jun-2017 10:00 AM 12-Jun-2017 A Approved Closed
Line 7
MH(29-L07)
to MH(29a-
Compaction test of Sand Filling Above the pipe trench and laying Approved w/
965 KHEP-CI-965
warning tape Storm Maine Line
L07) and 11-Jun-2017 12-Jun-2017 8:30 AM 14-Jun-2017 B comments
Closed
MH(29a-L07)
to MH(30-
L04)
MH(47-L15)
Compaction test of Sand Filling Above the pipe trench and laying
966 KHEP-CI-966
warning tape Storm Maine Line
to MH(46- 11-Jun-2017 12-Jun-2017 9:00 AM 13-Jun-2017 A Approved Closed
L15)
Compaction test 6th layer Back filling General fill (sta,0+100 to Approved w/
967 KHEP-CI-967
0+114)
Alley 04 NA 11-Jun-2017 12-Jun-2017 9:30 AM 13-Jun-2017 B comments
Closed
Line 8 MH(4-
L08) to
MH(3-L08)
and MH(3-
L08) to
MH(2-L08)
MH(2-L08) to
MH(1-L08) Approved w/
970 KHEP-CI-970 Back filling General Fill 1st Layer for the trench of main Sewer Line
and MH(1-
11-Jun-2017 12-Jun-2017 9:00 AM 14-Jun-2017 B comments
Closed
L08) to
MH(7-L01)
MH(1-L07) to
MH(3-L08)
and MH(1-
L06) to
MH(2-L08)
Line 8
MH(29-L07)
to MH(29a-
Sand fill around the Pipe up to the top of 800mm Dia, Storm Main
971 KHEP-CI-971
Line
L07) and 11-Jun-2017 12-Jun-2017 9:30 AM 13-Jun-2017 A Approved Closed
MH(29a-L07)
to MH(30-
L04)
Termite control surface preparation, installation and final inspection
972 KHEP-CI-972
for PC Grad beam
Cluster 10 B2 NA 11-Jun-2017 12-Jun-2017 10:30 AM 14-Jun-2017 E Rejected Closed
40cm, CMU, Mortar and Masonry Inspection Under Exterior Cluster 66,
974 KHEP-CI-974
Reinforced G.B A6
11-Jun-2017 12-Jun-2017 10:00 AM 12-Jun-2017 A Approved Closed
Road 3
976 KHEP-CI-976 Compaction test 2nd layer General fill (sta,0+300 to 12-Jun-2017 13-Jun-2017 8:30 AM 14-Jun-2017 A Approved Closed
0+425)
Line 31
MH(3-L31) to
MH(2-L31)
and MH(2-
L31) to
MH(1-L31)
977 KHEP-CI-977 Sand fill around the Pipe of Sewer line MH(1-L31) to 12-Jun-2017 13-Jun-2017 9:00 AM 14-Jun-2017 A Approved Closed
MH(1A-L31)
and MH(1A-
L31) to
MH(9-L02)
MH(1-L32) to
MH(1-L31)
Line 1
MH(21-L01)
978 KHEP-CI-978 Sand Bedding of sewer line under the Pipe
to MH(17-
12-Jun-2017 13-Jun-2017 9:30 AM 14-Jun-2017 A Approved Closed
L01)
Line 3 MH(3-
L03) to
MH(2-L03)
and MH(2-
L03) to
979 KHEP-CI-979 Back filling General Fill 1st Layer general fill MH(1-L03) 12-Jun-2017 13-Jun-2017 10:00 AM 15-Jun-2017 E Rejected Closed
MH(1-L03) to
MH(1A-L03)
and MH(1A-
L03) to
MH(5-L03)
Line 4/5
MH(2-L04) to
MH(1-L04)
and MH(1-
L04) to
980 KHEP-CI-980 Back filling General Fill 1st Layer general fill MH(1-L03) 12-Jun-2017 13-Jun-2017 10:30 AM 14-Jun-2017 A Approved Closed
MH(2-L05) to
MH(1-L05)
and MH(1-
L05) to
MH(1-L04)
First Coat, Damp Proofing Installation Inspection for Cmu, Mortar Cluster 81,
983 KHEP-CI-983
and Masonry Inspection Under Exterior Reinforced G.B A6
12-Jun-2017 13-Jun-2017 9:00 AM 14-Jun-2017 A Approved Closed
First Coat, Damp Proofing Installation Inspection for RC Footing & Cluster 6,
984 KHEP-CI-984
column neck BC4
12-Jun-2017 13-Jun-2017 9:00 AM 14-Jun-2017 A Approved Closed
Compaction test 5th layer back filling General fill (sta,0+100 to Approved w/
986 KHEP-CI-986
0+155)
Alley 06 NA 13-Jun-2017 14-Jun-2017 9:00 AM 15-Jun-2017 B comments
Closed
Line 15
MH(51-L15)
to MH(54-
Approved w/
987 KHEP-CI-987 Compaction test 1st layer General fill of Storm Trench L15) and 13-Jun-2017 14-Jun-2017 9:30 AM 15-Jun-2017 B comments
Closed
MH(54-L15)
to MH(52-
L15)
Cast in Place Concrete form work inspection For RC Column Ground Approved w/
988 KHEP-CI-988
floor Axis (G : K)
Cluster 02 A6 NA 13-Jun-2017 14-Jun-2017 10:00 AM 17-Jun-2017 B comments
Closed
Second Coat, Damp Proofing Installation Inspection for Cmu, Mortar Cluster 81,
989 KHEP-CI-989
and Masonry Inspection Under Exterior Reinforced G.B A6
13-Jun-2017 14-Jun-2017 9:00 AM 14-Jun-2017 A Approved Closed
Line 8 MH(3-
L08) to
MH(2-L08)
991 KHEP-CI-991 Inspection of excavated formation for pipe trench - Sewer Maine line
and MH(2-
13-Jun-2017 14-Jun-2017 10:00 AM 15-Jun-2017 E Rejected Closed
L08) to
MH(1-L08)
Zone 1B Line
9 MH(3-L09)
to MH(2-L09)
991.1 KHEP-CI-991-01 Inspection of excavated formation for pipe trench - Sewer Maine line
and MH(2-
17-Jun-2017 18-Jun-2017 10:30 AM 19-Jun-2017 A Approved Closed
L09) to
MH(1-L09)
Zone 1B,
993 KHEP-CI-993 Compaction test 1st and final layer Selected fill Cluster 23 14-Jun-2017 15-Jun-2017 9:00 AM 17-Jun-2017 A Approved Closed
BC4
Line 27
MH(114-L27)
to MH(111a-
994 KHEP-CI-994 Sand Bedding of storm line under the Pipe L27) and 14-Jun-2017 15-Jun-2017 10:00 AM 17-Jun-2017 A Approved Closed
MH(111a-
L27) to
MH(111-L27)
995 KHEP-CI-995 Back filling General Fill 4th Layer (sta,0+200 to 0+225) Alley 08 NA 14-Jun-2017 15-Jun-2017 10:30 AM 17-Jun-2017 E Rejected Closed
Zone 2B,
Alley 8
995.1 KHEP-CI-995-01 Compaction test 4th layer General fill
(sta,0+200 to
18-Jun-2017 19-Jun-2017 10:45 AM 21-Jun-2017 A Approved Closed
0+225)
Line 7
MH(19-L07)
to MH(20-
996 KHEP-CI-996 Back filling General Fill Storm 1st Layer (Final up to existing level) L07) and 14-Jun-2017 15-Jun-2017 10:30 AM 17-Jun-2017 E Rejected Closed
MH(20-L07)
to MH(27-
L07)
Line 15
MH(46-L15)
997 KHEP-CI-997 Back filling General Fill Storm 1st Layer (Final up to existing level)
to MH(47-
14-Jun-2017 15-Jun-2017 10:30 AM 17-Jun-2017 A Approved Closed
L15)
998 KHEP-CI-998 Compaction test and Formation level Zone 2B 14-Jun-2017 15-Jun-2017 10:30 AM 17-Jun-2017 A Approved Closed
Blinding concrete sampling, testing & placement inspection for grad Approved w/
1001 KHEP-CI-1001
beam
Cluster 11 B2 NA 15-Jun-2017 16-Jun-2017 11:00 AM 19-Jun-2017 B comments
Closed
Zone 2B,
Road 3,
(sta,3+375 to
1002 KHEP-CI-1002 Compaction test 3rd layer general fill 0+425) 17-Jun-2017 18-Jun-2017 10:45 AM 19-Jun-2017 A Approved Closed
(excluding
road 2
intersection)
Zone 1 B,
Line 1,
1003 KHEP-CI-1003 Inspection of excavated formation for pipe trench Sewer main line MH(15-L01) 17-Jun-2017 18-Jun-2017 10:30 AM 19-Jun-2017 E Rejected Closed
to MH(14-
L01)
Inspection of excavated and Compaction formation for pipe trench
Approved w/
1003.1 KHEP-CI-1003-01 Sewer main line Zone 1B, Line 1 Zone 1B Division 31 20-Sep-2017 21-Sep-2017 11:00 AM 24-Sep-2017 B comments
Closed
Line 1, MH(15-L01) to MH(14-L01)
Installation of reinforcing steel bar embedded item and form closure
1004 KHEP-CI-1004
inspection for RC Grad Beam
Cluster 13 B2 NA 17-Jun-2017 18-Jun-2017 10:00 AM 19-Jun-2017 A Approved Closed
Cast in Place Concrete form work inspection For RC Column Ground Approved w/
1008 KHEP-CI-1008
floor Axis (G3, J1,J3,K6,K5,K4,L6,L4,L3,L2,M6,M5)
Cluster 02 A6 NA 17-Jun-2017 18-Jun-2017 10:00 AM 19-Jun-2017 B comments
Closed
Zone 2B,
Alley 6
(sta,0+100 to
Approved w/
1016 KHEP-CI-1016 Compaction test 7th layer general fill 0+155) 19-Jun-2017 20-Jun-2017 10:45 AM 21-Jun-2017 B comments
Closed
(Excluding
Road 2
intersection)
Approved w/
1017 KHEP-CI-1017 Cast in place concrete Form work inspection for RC Grad Beam Cluster 15 B2 NA 19-Jun-2017 20-Jun-2017 10:00 AM 22-Jun-2017 B comments
Closed
Zone 2B,
Approved w/
1018 KHEP-CI-1018 Compaction test and Formation Existing Level Landscape 19-Jun-2017 20-Jun-2017 10:30 AM 21-Jun-2017 B comments
Closed
Area (Area 2)
Installation of reinforcing steel bar embedded item and form closure Cluster 69,
1026 KHEP-CI-1026
inspection for RC Roof Slab B2 Mockup
20-Jun-2017 21-Jun-2017 9:30 AM 22-Jun-2017 A Approved Closed
First Coat, Damp Proofing Installation Inspection for RC Footing & Cluster 16,
1028 KHEP-CI-1028
column neck BC4
NA 20-Jun-2017 21-Jun-2017 9:00 AM 22-Jun-2017 A Approved Closed
Zone 1B,
Line7,
Compaction test of Sand Filling Above the pipe trench and laying Approved w/
1029 KHEP-CI-1029
warning tape Storm Maine Line
MH(28-L07) 20-Jun-2017 21-Jun-2017 10:15 AM 22-Jun-2017 B comments
Closed
to MH(29-
L07)
Zone 2B,
Road 3
(sta,0+375 to
1033 KHEP-CI-1033 Compaction test 4th layer general fill 0+425) 21-Jun-2017 22-Jun-2017 10:45 AM 22-Jun-2017 A Approved Closed
(Excluding
Road 2
intersection)
First Coat, Damp Proofing Installation Inspection for Cmu, Mortar Cluster 66,
1038 KHEP-CI-1038
and Masonry Inspection Under Exterior Reinforced G.B A6
21-Jun-2017 22-Jun-2017 9:30 AM 22-Jun-2017 A Approved Closed
Approved w/
1041 KHEP-CI-1041 Cast in Place Concrete form work inspection For RC Roof Slab Cluster 69, B2 28-Jun-2017 29-Jun-2017 9:00 AM 29-Jun-2017 B comments
Closed
Second Coat, Damp Proofing Installation Inspection for RC Footing Cluster 16 Approved w/
1042 KHEP-CI-1042
& Column Neck BC4
NA 28-Jun-2017 29-Jun-2017 10:00 AM 29-Jun-2017 B comments
Closed
Second Coat, Damp Proofing Installation Inspection for Cmu, Mortar Cluster 66,
1043 KHEP-CI-1043
and Masonry Inspection Under Exterior Reinforced G.B A6
28-Jun-2017 29-Jun-2017 10:30 AM 29-Jun-2017 A Approved Closed
Termite control surface preparation, installation and final inspection Cluster 23, Approved w/
1044 KHEP-CI-1044
for PC footing BC4
28-Jun-2017 29-Jun-2017 11:00 AM 1-Jul-2017 B comments
Closed
Blinding concrete sampling, Testing & placement inspection for Cluster 23,
1045 KHEP-CI-1045
Footing BC4
28-Jun-2017 29-Jun-2017 1:30 PM 1-Jul-2017 A Approved Closed
1047 KHEP-CI-1047 Concrete sampling, testing & placement inspection for RC grad beam Cluster 15 B2 NA 28-Jun-2017 29-Jun-2017 8:30 AM 29-Jun-2017 A Approved Closed
Zone 2B, Line
7 & 8,
MH(28-L07)
to MH(27-
L07) and
MH(27-L07)
Compaction test of Sand Bedding Under Pipe Trench - Storm Maine Approved w/
1048 KHEP-CI-1048
Line
to MH(26a- 28-Jun-2017 29-Jun-2017 10:00 AM 1-Jul-2017 B comments
Closed
L08) MH(26a-
L08) to
MH(26-L08)
and MH(26-
L08) to
MH(21-L08)
1052 KHEP-CI-1052 Damp Proofing surface Preparation for RC grad beam Cluster 69, B2 28-Jun-2017 29-Jun-2017 10:30 AM 29-Jun-2017 A Approved Closed
Approved w/
1053 KHEP-CI-1053 First Coat, Damp Proofing Installation Inspection for RC Grad beam Cluster 69, B2 29-Jun-2017 1-Jul-2017 10:00 AM 2-Jul-2017 B comments
Closed
Approved w/
1054 KHEP-CI-1054 Cast in place concrete Form work inspection for RC Grad Beam Cluster 13 B2 NA 29-Jun-2017 1-Jul-2017 10:30 AM 2-Jul-2017 B comments
Closed
Installation of reinforcing steel bar embedded item and form closure Approved w/
1055 KHEP-CI-1055
inspection for RC Column (Ground Floor)
Cluster 15 B2 NA 29-Jun-2017 1-Jul-2017 9:30 AM 2-Jul-2017 B comments
Closed
Line 1,
MH(21-L01)
to MH(20-
L01) and
MH(20-L01)
to MH(19-
Approved w/
1057 KHEP-CI-1057 Inspection of Sand Filling Around Pipe - Storm Maine line L01) and 29-Jun-2017 1-Jul-2017 10:30 AM 1-Jul-2017 B comments
Closed
MH(19-L01)
to MH(18-
L01) and
MH(18-L01)
to MH(17-
L01)
Zone 1B, Line
34, MH(2-
L34) to
MH(1-L34)
Back filling General Fill 4th Layer (up to existing ground level) for and MH(1- Approved w/
1058 KHEP-CI-1058
pipe trench - Sewer Maine line L34) to
29-Jun-2017 1-Jul-2017 3:00 PM 1-Jul-2017 B comments
Closed
MH(1a-L34)
and MH(1a-
L34) to
MH(7-L02)
Compaction test Around Footing general fill (Final layer ) Zone 1B,
1060 KHEP-CI-1060
Cluster 5
Cluster 5 Zone 1B Division 31 1-Jul-2017 2-Jul-2017 10:00 AM 2-Jul-2017 A Approved Closed
Compaction test Around Footing general fill (Final layer ) Zone 1B,
1061 KHEP-CI-1061
Cluster 10
Cluster 10 Zone 1B Division 31 1-Jul-2017 2-Jul-2017 10:00 AM 2-Jul-2017 A Approved Closed
Compaction test Around Footing general fill (Final layer ) Zone 1B,
1062 KHEP-CI-1062
Cluster 11
Cluster 11 Zone 1B Division 31 1-Jul-2017 2-Jul-2017 10:00 AM 2-Jul-2017 A Approved Closed
Concrete sampling, testing and placement inspection for RC Roof Cluster 69,
1067 KHEP-CI-1067
slab Cluster 69, B2 Mockup B2
NA Division 3 1-Jul-2017 2-Jul-2017 9:00 AM 2-Jul-2017 A Approved Closed
Compaction test Around Footing general fill (Final layer) Zone 1B,
1074 KHEP-CI-1074
Cluster 12
Cluster 12 Zone 1B Division 31 2-Jul-2017 3-Jul-2017 10:00 AM 4-Jul-2017 A Approved Closed
Compaction test Around Footing general fill (Final layer) Zone 1B,
1075 KHEP-CI-1075
Cluster 13
Cluster 13 Zone 1B Division 31 2-Jul-2017 3-Jul-2017 10:00 AM 4-Jul-2017 A Approved Closed
Compaction test Around Footing general fill (Final layer) Zone 1B,
1076 KHEP-CI-1076
Cluster 14
Cluster 14 Zone 1B Division 31 2-Jul-2017 3-Jul-2017 10:30 AM 4-Jul-2017 A Approved Closed
Compaction test of Sand Filling Above the pipe trench and laying
warning tape - Sewer Maine Line Line 1, MH(21-L01) to MH(20-L01) Approved w/
1082 KHEP-CI-1082
and MH(20-L01) to MH(19-L01) and MH(19-L01) to MH(18-L01) and
Line 1 NA Division 31 2-Jul-2017 3-Jul-2017 11:00 AM 3-Jul-2017 B comments
Closed
MH(18-L01) to MH(17-L01)
Compaction test 8th layer general fill Zone 2B, Alley 6, (sta,0+000 to
1083 KHEP-CI-1083
0+155) (Excluding Road 2 intersection)
Alley 06 Zone 2B Division 31 2-Jul-2017 3-Jul-2017 11:00 AM 3-Jul-2017 A Approved Closed
Compaction test 8th layer general fill Zone 2B, Alley 4, (sta,0+000 to
1084 KHEP-CI-1084
0+114) (Excluding Road 2 intersection)
Alley 04 Zone 2B Division 31 2-Jul-2017 3-Jul-2017 11:00 AM 3-Jul-2017 A Approved Closed
Compaction test 1st and final layer Structural fill (Selected fill) Zone Cluster 28,
1086 KHEP-CI-1086
2B, Cluster 28, BC4 BC4
Zone 2B Division 31 3-Jul-2017 4-Jul-2017 10:30 AM 4-Jul-2017 E Rejected Closed
Compaction test 1st and final layer Structural fill (Selected fill) Zone Cluster 28,
1086.1 KHEP-CI-1086-01
2B, Cluster 28, BC4 BC4
Zone 2B Division 31 5-Jul-2017 6-Jul-2017 10:30 AM 8-Jul-2017 A Approved Closed
Compaction test 1st and final layer Structural fill (Selected fill) Zone Cluster 29,
1087 KHEP-CI-1087
2B, Cluster 29, BC4 BC4
Zone 2B Division 31 3-Jul-2017 4-Jul-2017 10:30 AM 4-Jul-2017 A Approved Closed
Second Coat, Damp Proofing Installation Inspection for RC Footing Cluster 75,
1089 KHEP-CI-1089
& Column neck Cluster 75, B2 B2
NA Division 07 3-Jul-2017 4-Jul-2017 10:30 AM 4-Jul-2017 A Approved Closed
Second Coat, Damp Proofing Installation Inspection for RC Footing Cluster 34,
1090 KHEP-CI-1090
& Column neck Cluster 34, B2 B2
NA Division 07 3-Jul-2017 4-Jul-2017 9:30 AM 4-Jul-2017 A Approved Closed
Cast in Place Concrete form work inspection For RC Column Ground Approved w/
1091 KHEP-CI-1091
floor Axis (B1,B2,B3,B6,C1,C2,D1,D2,D3,D6) Cluster 15, B2
Cluster 15 B2 NA Division 03 3-Jul-2017 4-Jul-2017 9:00 AM 5-Jul-2017 B comments
Closed
Inspection of Sand Filling Around Pipe - Sewer Maine line Line 1, Approved w/
1094 KHEP-CI-1094
MH(17-L01) to MH(16-L01) and MH(16-L01) to MH(15-L01)
Line 1 NA Division 31 3-Jul-2017 4-Jul-2017 3:00 PM 5-Jul-2017 B comments
Closed
Compaction test 2nd layer general fill Alley 1 (sta,0+115 to 0+193) Approved w/
1096.1 KHEP-CI-1096-01
(Excluding Road 2 intersection)
Alley 01 NA Division 31 8-Jul-2017 9-Jul-2017 10:30 AM 10-Jul-2017 B comments
Closed
Jobsite
1097 KHEP-CI-1097 Sampling- Aggregate sub base materials Jobsite StockPile 9
StockPile 9
NA Division 31 4-Jul-2017 5-Jul-2017 10:00 AM 6-Jul-2017 E Rejected Closed
Jobsite Approved w/
1097.1 KHEP-CI-1097-01 Sampling- Aggregate sub base materials Jobsite StockPile 9
StockPile 9
NA Division 31 9-Jul-2017 10-Jul-2017 10:30 AM 11-Jul-2017 B comments
Closed
Jobsite Approved w/
1097.2 KHEP-CI-1097-02 Sampling- Aggregate sub base materials Jobsite StockPile 9
StockPile 9
NA Division 31 24-Jul-2017 25-Jul-2017 10:30 AM 26-Jul-2017 B comments
Closed
Inspection of Sand Filling Around Pipe - Storm Maine line Zone 2B,
Line 7 & 8, MH(21-L08) to MH(26-L08) and MH(26-L08) to MH(26a-
1098 KHEP-CI-1098
L08) and MH(26a-L08) to MH(27-L07) and MH(27-L07) to MH(28-
Line 7 & 8 Zone 2B Division 31 4-Jul-2017 5-Jul-2017 3:00 PM 6-Jul-2017 E Rejected Closed
L07) a
Inspection of Sand Filling Around Pipe - Storm Maine line ( Along
Road 1 & Road 5) Zone 2B, Line 7 & 8, MH(21-L08) to MH(26-L08)
Approved w/
1098.1 KHEP-CI-1098-01 Dia.400 and MH(26-3-L08) to MH(26a-L08) Dia.500 and MH(26a- Line 7 & 8 Zone 2B Division 31 16-Jul-2017 17-Jul-2017 10:00 AM 18-Jul-2017 B comments
Closed
L08) to MH(27-L07) and MH(27-L07) to MH(28-L07) Dia.500 &
Dia.700
First Coat, Damp Proofing Installation Inspection for Cmu, Mortar
Cluster 3, A6
1099 KHEP-CI-1099 and Masonry Inspection Under Exterior Reinforced G.B Cluster 3, A6 NA Division 07 4-Jul-2017 5-Jul-2017 9:30 AM 5-Jul-2017 A Approved Closed
Installation of reinforcing steel bar embedded item and form closure Cluster 24,
1100 KHEP-CI-1100
inspection for RC Grad beam Cluster 24, BC4 BC4
NA Division 03 4-Jul-2017 5-Jul-2017 3:00 PM 5-Jul-2017 A Approved Closed
Cast in place concrete Form work inspection for RC Footing Cluster Cluster 24,
1101 KHEP-CI-1101
24, BC4 BC4
NA Division 03 4-Jul-2017 5-Jul-2017 11:00 AM 5-Jul-2017 A Approved Closed
40cm, CMU, Mortar and Masonry Inspection Under Exterior Cluster 44,
1103 KHEP-CI-1103
Reinforced Grad beam Cluster 44, A6 A6
NA Division 04 4-Jul-2017 5-Jul-2017 3:30 PM 8-Jul-2017 E Rejected Closed
40cm, CMU, Mortar and Masonry Inspection Under Exterior Cluster 44,
1103.1 KHEP-CI-1103-01
Reinforced Grad beam Cluster 44, A6 A6
NA Division 04 18-Jul-2017 19-Jul-2017 3:00 PM 22-Jul-2017 A Approved Closed
Compaction test 3rd layer general fill Alley 11, (sta,0+000 to 0+075)
1105.1 KHEP-CI-1105-01
(Excluding Road 1 intersection)
Alley 11 NA Division 31 10-Jul-2017 11-Jul-2017 10:00 AM 12-Jul-2017 A Approved Closed
Installation of reinforcing steel bar embedded item and form closure Cluster 78,
1110 KHEP-CI-1110
inspection for RC Column neck Cluster 78, BC4 BC4
NA Division 03 5-Jul-2017 6-Jul-2017 11:00 AM 8-Jul-2017 A Approved Closed
Cast in place concrete Form work inspection for RC Column neck Cluster 9,
1111 KHEP-CI-1111
Cluster 9, BC4 BC4
NA Division 03 5-Jul-2017 6-Jul-2017 3:00 PM 8-Jul-2017 A Approved Closed
Second Coat, Damp Proofing Installation Inspection for RC Footing Cluster 33,
1112 KHEP-CI-1112
& Column neck Cluster 33, B2 B2
NA Division 07 5-Jul-2017 6-Jul-2017 10:00 AM 8-Jul-2017 A Approved Closed
Compaction test of Sand Filling Above the pipe trench and laying
1115 KHEP-CI-1115 warning tape Swear Maine Line Zone 4B, Line 1, MH-L01 to MH-16- Line 1 Zone 4B Division 31 5-Jul-2017 6-Jul-2017 10:30 AM 8-Jul-2017 A Approved Closed
L01 and MH-16-L01 to MH-15-L01
Back filling General Fill 1st Layer for pipe trench - Sewer Maine line
Zone 4B, Line 1, MH(21-L01) to MH(20-L01) and MH(20-L01) to
1116 KHEP-CI-1116
MH(19-L01) and MH(19-L01) to MH(18-L01) and MH(18-L01) to
Line 1 Zone 4B Division 31 5-Jul-2017 6-Jul-2017 10:30 AM 8-Jul-2017 A Approved Closed
MH(17-L01)
First Coat, Damp Proofing Installation Inspection for Cmu, Mortar
1117 KHEP-CI-1117 and Masonry Inspection Under Exterior Reinforced Grad beam Cluster 4, A6 NA Division 07 5-Jul-2017 6-Jul-2017 10:30 AM 8-Jul-2017 E Rejected Closed
Cluster 4, A6
First Coat, Damp Proofing Installation Inspection for Cmu, Mortar
1117.1 KHEP-CI-1117-01 and Masonry Inspection Under Exterior Reinforced Grad beam Cluster 4, A6 NA Division 07 10-Jul-2017 11-Jul-2017 10:30 AM 12-Jul-2017 A Approved Closed
Cluster 4, A6
Compaction test 9th layer general fill Alley 6, (sta,0+100 to 0+155)
1118 KHEP-CI-1118
(Excluding Road 2 intersection)
Alley 06 NA Division 31 5-Jul-2017 6-Jul-2017 11:15 AM 8-Jul-2017 A Approved Closed
Inspection of Sand filling around the Pipe Sewer Maine line 200mm
Dia. (Along Alley 5) Zone 2B, Line 5 & 15, MH(3-L09) to MH(2-L09)
1123 KHEP-CI-1123
and MH(2-L09) to MH(1-L09) and MH(1-L09) to MH(1a-L09) and
Line 5 & 15 Zone 2B Division 31 6-Jul-2017 8-Jul-2017 10:15 AM 9-Jul-2017 E Rejected Closed
MH(1a-L10) to MH(1a-L10) and MH(1a-L10) to MH(1a-L09)
Inspection of Sand filling around the Pipe Sewer Maine line Zone 2B,
Line 09 & 10, MH(3-L09) to MH(2-L09) and MH(2-L09) to MH(1-
1123.1 KHEP-CI-1123-01
L09) and MH(1-L09) to MH(1a-L09) and MH(1a-L10) to MH(1a-L10)
Line 9 & 10 Zone 2B Division 31 10-Jul-2017 11-Jul-2017 10:30 AM 12-Jul-2017 B Approved Closed
and MH(1a-L10) to MH(1a-L09)
Concrete sampling, testing and placement inspection for RC Grad
1124 KHEP-CI-1124
Beam Cluster 14, B2
Cluster 14 B2 NA Division 03 6-Jul-2017 8-Jul-2017 9:00 AM 8-Jul-2017 A Approved Closed
Installation of reinforcing steel bar embedded item and form closure Cluster 23,
1126 KHEP-CI-1126
inspection for RC Footing Cluster 23, BC4 BC4
NA Division 03 6-Jul-2017 8-Jul-2017 11:00 AM 8-Jul-2017 A Approved Closed
Cast in place concrete Form work inspection for RC Footing Cluster Cluster 23,
1127 KHEP-CI-1127
23, BC4 BC4
NA Division 03 6-Jul-2017 8-Jul-2017 3:00 PM 8-Jul-2017 A Approved Closed
Concrete sampling, testing and placement inspection for RC Footing Cluster 24,
1128 KHEP-CI-1128
Cluster 24, BC4 BC4
NA Division 03 6-Jul-2017 8-Jul-2017 9:00 AM 8-Jul-2017 A Approved Closed
Cast in place concrete Form work inspection for RC Column neck Cluster 21,
1137 KHEP-CI-1137
Cluster 21, BC4 BC4
NA Division 03 8-Jul-2017 9-Jul-2017 3:00 PM 10-Jul-2017 A Approved Closed
Compaction test 1st layer general fill Alley 6, (sta,0+000 to 0+155) Approved w/
1143 KHEP-CI-1143
(Excluding Road 2 intersection)
Alley 01 NA Division 31 8-Jul-2017 9-Jul-2017 10:45 AM 10-Jul-2017 B comments
Closed
Cast in place concrete Form work inspection for RC Column (Ground
1144 KHEP-CI-1144
floor) Excluding (B1,B2,B3,B6,C1,D1,D2,D3,D6) Cluster 15, B2
Cluster 15 B2 NA Division 03 8-Jul-2017 9-Jul-2017 10:00 AM 9-Jul-2017 A Approved Closed
Compaction test Around Footing general fill (Final layer) Zone 4B,
1151 KHEP-CI-1151
Cluster 68
Cluster 68 Zone 4B Division 31 9-Jul-2017 10-Jul-2017 10:30 AM 11-Jul-2017 A Approved Closed
Cast in place concrete Form work inspection for RC First Floor slab
1155 KHEP-CI-1155
Cluster 1, A6
Cluster 01 A6 NA Division 03 9-Jul-2017 10-Jul-2017 10:00 AM 12-Jul-2017 A Approved Closed
Blinding concrete sampling, Testing & placement inspection for Cluster 29,
1158 KHEP-CI-1158
Footing Cluster 29, BC4 BC4
NA Division 03 9-Jul-2017 10-Jul-2017 1:30 PM 12-Jul-2017 A Approved Closed
Termite control surface preparation, installation and final inspection Cluster 81,
1159 KHEP-CI-1159
for Grad Beam Cluster 81, A6 A6
NA Division 03 9-Jul-2017 10-Jul-2017 10:30 AM 11-Jul-2017 E Rejected Closed
Termite control surface preparation, installation and final inspection Cluster 81,
1159.1 KHEP-CI-1159-01
for Grad Beam Cluster 81, A6 A6
NA Division 03 30-Jul-2017 31-Jul-2017 10:30 AM 1-Aug-2017 E Rejected Closed
Termite control surface preparation, installation and final inspection Cluster 81,
1159.2 KHEP-CI-1159-02
for Grad Beam Cluster 81, A6 A6
NA Division 03 6-Aug-2017 7-Aug-2017 10:30 AM 13-Aug-2017 A Approved Closed
Blinding concrete sampling, Testing & placement inspection for Grad Cluster 81,
1160 KHEP-CI-1160
Beam Cluster 81, A6 A6
NA Division 03 9-Jul-2017 10-Jul-2017 1:30 PM 11-Jul-2017 E Rejected Closed
Blinding concrete sampling, Testing & placement inspection for Grad Cluster 81,
1160.1 KHEP-CI-1160-01
Beam Cluster 81, A6 A6
NA Division 03 30-Jul-2017 31-Jul-2017 3:00 PM 1-Aug-2017 E Rejected Closed
Blinding concrete sampling, Testing & placement inspection for Grad Cluster 81,
1160.2 KHEP-CI-1160-02
Beam Cluster 81, A6 A6
NA Division 03 6-Aug-2017 7-Aug-2017 10:30 AM 13-Aug-2017 A Approved Closed
Termite control surface preparation, installation and final inspection Cluster 28,
1161 KHEP-CI-1161
for Footing Cluster 28, BC4 BC4
NA Division 03 10-Jul-2017 11-Jul-2017 10:30 AM 13-Jul-2017 E Rejected Closed
Termite control surface preparation, installation and final inspection Cluster 28,
1161.1 KHEP-CI-1161-01
for Footing Cluster 28, BC4 BC4
NA Division 03 15-Jul-2017 16-Jul-2017 10:30 AM 17-Jul-2017 A Approved Closed
Blinding concrete sampling, Testing & placement inspection for Cluster 28,
1162 KHEP-CI-1162
Footing Cluster 28, BC4 BC4
NA Division 03 10-Jul-2017 11-Jul-2017 3:00 PM 13-Jul-2017 E Rejected Closed
Blinding concrete sampling, Testing & placement inspection for Cluster 28,
1162.1 KHEP-CI-1162-01
Footing Cluster 28, BC4 BC4
NA Division 03 15-Jul-2017 16-Jul-2017 10:30 AM 17-Jul-2017 A Approved Closed
Installation of reinforcing steel bar embedded item and form closure Cluster 23,
1163 KHEP-CI-1163
inspection for RC Column neck Cluster 23, BC4 BC4
NA Division 03 10-Jul-2017 11-Jul-2017 10:30 AM 12-Jul-2017 A Approved Closed
Cast in place concrete Form work inspection for RC First Floor Stair
1166 KHEP-CI-1166
( First Flight) Cluster 15, B2
Cluster 15 B2 NA Division 03 10-Jul-2017 11-Jul-2017 9:30 AM 13-Jul-2017 E Rejected Closed
Cast in place concrete Form work inspection for RC Ground Floor Approved w/
1166.1 KHEP-CI-1166-01
Stair ( First Flight) Cluster 15, B2
Cluster 15 B2 NA Division 03 15-Jul-2017 16-Jul-2017 9:30 AM 18-Jul-2017 B comments
Closed
Inspection of Sand filling around the Pipe Sewer Maine line Zone 2B, Approved w/
1171 KHEP-CI-1171
Line 9 , MH(1a-L09) to MH(9-L01)
Line 9 Zone 2B Division 31 10-Jul-2017 11-Jul-2017 10:30 AM 12-Jul-2017 B comments
Closed
Inspection of Sand filling around the Pipe Sewer Maine line Zone 2B,
Approved w/
1172 KHEP-CI-1172 Line 2 , MH(22-L02) to MH(21-L02) and MH(21-L02) to MH(20-L02) Line 2 Zone 2B Division 31 10-Jul-2017 11-Jul-2017 10:30 AM 12-Jul-2017 B comments
Closed
and MH(20-L02) to MH(19-L02) and MH(19-L02) to MH(18-L02)
First Coat, Damp Proofing Installation Inspection for RC Footing & Cluster 54,
1180 KHEP-CI-1180
Column neck Cluster 54, B2 B2
NA Division 03 11-Jul-2017 12-Jul-2017 10:00 AM 13-Jul-2017 A Approved Closed
First Coat, Damp Proofing Installation Inspection for RC Footing & Cluster 58,
1181 KHEP-CI-1181
Column neck Cluster 58, B2 B2
NA Division 03 11-Jul-2017 12-Jul-2017 10:00 AM 13-Jul-2017 A Approved Closed
Termite control surface preparation, installation and final inspection Cluster 66,
1183 KHEP-CI-1183
for Grad Beam Cluster 66, A6 A6
NA Division 03 11-Jul-2017 12-Jul-2017 10:30 AM 15-Jul-2017 E Rejected Closed
Termite control surface preparation, installation and final inspection Cluster 66,
1183.1 KHEP-CI-1183-01
for Grad Beam Cluster 66, A6 A6
NA Division 03 17-Jul-2017 18-Jul-2017 10:30 AM 20-Jul-2017 A Approved Closed
Blinding concrete sampling, Testing & placement inspection for Grad Cluster 66,
1184 KHEP-CI-1184
Beam Cluster 66, A6 A6
NA Division 03 11-Jul-2017 12-Jul-2017 3:00 PM 15-Jul-2017 E Rejected Closed
Blinding concrete sampling, Testing & placement inspection for Grad Cluster 66,
1184.1 KHEP-CI-1184-01
Beam Cluster 66, A6 A6
NA Division 03 17-Jul-2017 18-Jul-2017 11:00 AM 20-Jul-2017 A Approved Closed
Compaction test of Sand Bedding Under Pipe Trench - Storm Maine Approved w/
1185 KHEP-CI-1185
Line Zone 1B, Line 10, MH(131-L10) to MH(32-L10)
Line 10 Zone 1B Division 31 11-Jul-2017 12-Jul-2017 3:00 PM 13-Jul-2017 B comments
Closed
Installation of reinforcing steel bar embedded item and form closure Cluster 69,
1189 KHEP-CI-1189
inspection for RC Up stand Cluster 69, Mockup Mockup
NA Division 03 11-Jul-2017 12-Jul-2017 3:00 PM 13-Jul-2017 E Rejected Closed
Installation of reinforcing steel bar embedded item and form closure Cluster 69,
1189.1 KHEP-CI-1189-01
inspection for RC Up stand Cluster 69, Mockup Mockup
NA Division 03 16-Jul-2017 17-Jul-2017 9:30 AM 18-Jul-2017 A Approved Closed
Cast in place concrete Form work inspection for RC Up stand Cluster Cluster 69,
1190 KHEP-CI-1190
69, B2 Mockup B2 Mockup
NA Division 03 11-Jul-2017 12-Jul-2017 3:00 PM 13-Jul-2017 E Rejected Closed
Cast in place concrete Form work inspection for RC Up stand Cluster Cluster 69,
1190.1 KHEP-CI-1190-01
69, B2 Mockup B2 Mockup
NA Division 03 16-Jul-2017 17-Jul-2017 9:00 AM 18-Jul-2017 A Approved Closed
Cast in place concrete Form work inspection for RC Column Ground Cluster 68,
1191 KHEP-CI-1191
Floor Cluster 68, B2 B2
NA Division 03 11-Jul-2017 12-Jul-2017 3:00 PM 15-Jul-2017 A Approved Closed
First Coat, Damp Proofing Installation Inspection for RC Footing & Cluster 35,
1193 KHEP-CI-1193
Column neck Cluster 35, B2 B2
NA Division 07 12-Jul-2017 13-Jul-2017 10:00 AM 15-Jul-2017 A Approved Closed
First Coat, Damp Proofing Installation Inspection for RC Footing & Cluster 48,
1194 KHEP-CI-1194
Column neck Cluster 48, B2 B2
NA Division 07 12-Jul-2017 13-Jul-2017 10:00 AM 15-Jul-2017 A Approved Closed
Cast in place concrete Form work inspection for RC Footing Cluster Cluster 29,
1195 KHEP-CI-1195
29, BC4 BC4
NA Division 03 12-Jul-2017 13-Jul-2017 11:00 AM 15-Jul-2017 A Approved Closed
Installation of reinforcing steel bar embedded item and form closure Cluster 29,
1196 KHEP-CI-1196
inspection for RC Footing Cluster 29, BC4 BC4
NA Division 03 12-Jul-2017 13-Jul-2017 11:00 AM 15-Jul-2017 A Approved Closed
Compaction test 1st and final layer Structural fill (Selected fill) Zone Cluster 76,
1198 KHEP-CI-1198
4B, Cluster 76, BC4 BC4
Zone 4B Division 31 12-Jul-2017 13-Jul-2017 3:00 PM 15-Jul-2017 A Approved Closed
Compaction test 1st and final layer Structural fill (Selected fill) Zone Cluster 60,
1199 KHEP-CI-1199
3B, Cluster 60, BC4 BC4
Zone 3B Division 31 12-Jul-2017 13-Jul-2017 11:30 AM 15-Jul-2017 A Approved Closed
Compaction test 4th layer general fill Alley 11, (sta,0+000 to 0+075)
1200 KHEP-CI-1200
(Excluding Alley 1 intersection)
Alley 11 NA Division 31 12-Jul-2017 13-Jul-2017 11:00 AM 15-Jul-2017 A Approved Closed
1209 KHEP-CI-1209 Zone 4B, Line 27, MH(114-L27) to MH(111a-L27) and MH(111a- Line 27 Zone 4B Division 31 13-Jul-2017 15-Jul-2017 10:30 AM 15-Jul-2017 E Rejected Closed
L27) to MH(111-L27) and MH(111-L27) to MH(110a-L27) and
MH(110a-L27) to MH(108-L27)
Inspection of Sand filling around the Pipe Storm Maine line ( Along
Road 2)
Approved w/
1209.1 KHEP-CI-1209-01 Zone 4B, Line 27, MH-114-L27 to MH-111a-L27 and MH-111a-L27 Line 27 Zone 4B Division 31 17-Jul-2017 18-Jul-2017 10:30 AM 19-Jul-2017 B comments
Closed
to MH-111-L27 800mm and MH-111-L27 to MH-110a-L27 and MH-
110a-L27- to MH-108-L27 800mm
Compaction test of Sand Filling Above the pipe trench and laying
warning tape Swear Maine Line Zone 4B, Approved w/
1210 KHEP-CI-1210
Line 2, MH-22-L02 to MH-21-L02 and MH-21-L02 to MH-20-L02 and
Line 2 Zone 4B Division 31 13-Jul-2017 15-Jul-2017 11:00 AM 16-Jul-2017 B comments
Closed
MH-20-L02 to MH-19-L02 and MH-19-L02 to MH-18-L02
Installation of reinforcing steel bar embedded item and form closure Approved w/
1213 KHEP-CI-1213
inspection for RC Column (First Floor) Cluster 1, A6
Cluster 01 A6 NA Division 03 13-Jul-2017 15-Jul-2017 3:00 PM 17-Jul-2017 B comments
Closed
Compaction test of Sand Filling Above the pipe trench and laying
warning tape Swear Maine Line Zone 2B,
1218 KHEP-CI-1218 Line 9 & 10, MH-3-L09 to MH-2-L09 and MH-2-L09 to MH-1-L09 and Line 9 & 10 Zone 2B Division 31 15-Jul-2017 16-Jul-2017 10:30 AM 17-Jul-2017 A Approved Closed
MH-1-L09 to MH-1a-L09 and MH-1a-L09 to MH-9-L01 and MH-1-L10
to MH-1a-L10 and MH-1a-L10 to MH-1-L09
Inspection of Sand filling around the Pipe Sewer Maine Line Dia
200mm
1243.1 KHEP-CI-1243-01 Zone 2B, Line 2, MH-18-L02 to MH-17-L02 and MH-17-L02 to MH- Line 2 Zone 2B Division 31 20-Jul-2017 22-Jul-2017 11:30 AM 24-Jul-2017 A Approved Closed
16-L02 and MH-16-L02 to MH-15-L02 and MH-15-L02 to MH-14-L02
Inspection of Sand filling around the Pipe Storm Maine Line Dia
500mm Approved w/
1262 KHEP-CI-1262
Zone 4B, Line 22, MH-89-L22 to MH-90-L22 and MH-90-L22 to MH-
Line 22 Zone 4B Division 31 18-Jul-2017 19-Jul-2017 10:30 AM 19-Jul-2017 B comments
Closed
91-L22
Compaction test of Sand Filling Above the pipe trench and laying
warning tape Storm Maine Line Dia 500mm & 600mm
Approved w/
1263 KHEP-CI-1263 Zone 4B, Line 18 Zone 4B Division 31 18-Jul-2017 19-Jul-2017 3:00 PM 20-Jul-2017 B comments
Closed
Line 18, MH-62-L18 to MH-63-L18 and MH-63-L18 to MH-64-L18 and
MH-64-L18 to MH-74-L18
Compaction test Formation Level (NGL) Bottom of Foundation
Cluster 41,
1264 KHEP-CI-1264
BC4
Zone 2B Division 31 18-Jul-2017 19-Jul-2017 3:00 PM 20-Jul-2017 E Rejected Closed
Zone 2B, Cluster
Compaction 41, BC4 Level (NGL) Bottom of Foundation
test Formation
Cluster 41,
1264.1 KHEP-CI-1264-01
BC4
Zone 2B Division 31 6-Aug-2017 7-Aug-2017 10:00 AM 8-Aug-2017 A Approved Closed
Zone 2B, Cluster
Compaction 41, BC4 Level (NGL) Bottom of Foundation
test Formation
Cluster 42,
1265 KHEP-CI-1265
BC4
Zone 2B Division 31 18-Jul-2017 19-Jul-2017 3:00 PM 20-Jul-2017 E Rejected Closed
Zone 2B, Cluster
Compaction 42, BC4 Level (NGL) Bottom of Foundation
test Formation
Cluster 42,
1265.1 KHEP-CI-1265-01
BC4
Zone 2B Division 31 6-Aug-2017 7-Aug-2017 3:00 PM 8-Aug-2017 A Approved Closed
Zone 2B, Cluster 42, BC4
Blinding concrete sampling, Testing & placement inspection for
Manhole Storm Maine Line Zone 1B, Line 7
1266 KHEP-CI-1266
& 8, MH-21-L08 to MH-26-L08 and MH-26a-L08 M.H Dia 1200 (Type
Line 7 & 8 Zone 1B Division 03 18-Jul-2017 19-Jul-2017 3:00 PM 20-Jul-2017 A Approved Closed
1) MH-27-L07 and MH-28-L07 M.H Dia 1500 (Type 1)
Inspection of Sand filling around the Pipe Sewer Maine Line Dia
200mm
1294 KHEP-CI-1294 Zone 2B, Line 29 & 30, MH-3-L30 to MH-2-L30 and MH-2-L30 to MH- Line 29 & 30 Zone 2B Division 31 22-Jul-2017 23-Jul-2017 11:30 AM 24-Jul-2017 A Approved Closed
1-L30 and MH-1-L30 to MH-1a-L30 and MH-1a-L30 to MH-11-L02
and MH-1-L29 to MH-1a-L29 and MH-1a-L29 to MH-1-L30
Inspection of Sand filling around the Pipe Sewer Maine Line Dia
400mm
1295 KHEP-CI-1295
Zone 2B, Line 30, MH-106-L30 to MH-107-L03 and MH-107-L30 to
Line 30 Zone 2B Division 31 22-Jul-2017 23-Jul-2017 3:00 PM 24-Jul-2017 A Approved Closed
MH-107a-L30 and MH-107a-L30 to MH-108-L27
Compaction test of Sand Bedding Under Pipe Trench - Storm Maine
Line Dia 200mm
1296 KHEP-CI-1296
Zone 2B, Line 1, MH-14-L01 to MH13-L01 and MH-13-L01 to
Line 1 Zone 2B Division 31 22-Jul-2017 23-Jul-2017 10:30 AM 24-Jul-2017 A Approved Closed
MH-12-L01 and MH-12-L01 to MH-11-L01
Compaction test of Sand Filling Above the pipe trench and laying
warning tape Storm Maine Line Dia 500mm
1297 KHEP-CI-1297
Zone 2B, Line 22,
Line 22 Zone 2B Division 31 22-Jul-2017 23-Jul-2017 11:00 AM 25-Jul-2017 A Approved Closed
MH-89-L22 to MH-90-L22 and MH-90-L22 to MH-91-L22
Cast in place concrete Form work inspection for RC Column (First
Approved w/
1298 KHEP-CI-1298 Floor) Axis (J2, L6, N1, N4) Cluster 01 A6 NA Division 03 22-Jul-2017 23-Jul-2017 3:00 PM 24-Jul-2017 B comments
Closed
Cluster 1, A6
Compaction test of Sand Bedding Under Pipe Trench - Sewer Maine
Line Dia 200mm
1299 KHEP-CI-1299 Zone 2B, Line 2, MH-14-L02 to MH-13-L02 and MH-13-L02 to Line 2 Zone 2B Division 31 22-Jul-2017 23-Jul-2017 3:00 PM 25-Jul-2017 A Approved Closed
MH-12-L02 and MH-12-L02 to MH-11-L02 and MH-11-L02 to MH-10-
L02 and MH-10-L02 to MH-9-L02
40cm, CMU, Mortar and Masonry Inspection Under Exterior
1300 KHEP-CI-1300 Reinforced Grad beam Cluster 71, B2 NA Division 04 23-Jul-2017 24-Jul-2017 10:30 AM 26-Jul-2017 A Approved Closed
Cluster 71, B2
Cast in place concrete Form work inspection for RC Column (Ground
1301 KHEP-CI-1301 Floor) Axis (B2,B3,D2,D3,A6,E6) Cluster 12 B2 NA Division 03 23-Jul-2017 24-Jul-2017 3:00 PM 26-Jul-2017 A Approved Closed
Cluster 12, B2
Termite control surface preparation, installation and final inspection
Cluster 60,
1302 KHEP-CI-1302 for Footing Cluster 60,
BC4
NA Division 03 23-Jul-2017 24-Jul-2017 10:00 AM 26-Jul-2017 A Approved Closed
BC4
Blinding concrete sampling, Testing & placement inspection for
Cluster 60,
1303 KHEP-CI-1303 Footing Cluster
BC4
NA Division 03 23-Jul-2017 24-Jul-2017 10:00 AM 27-Jul-2017 A Approved Closed
60, BC4
Sampling fine sand for mortar
1304 KHEP-CI-1304
Site work
Site work NA Division 03 23-Jul-2017 24-Jul-2017 10:00 AM 25-Jul-2017 E Rejected Closed
Inspection of Sand filling around the Pipe Storm Maine Line Dia
400mm
1306 KHEP-CI-1306
Zone 1B, Line 11, MH-133-L11 to MH-134-L11 and MH-134-L11 to
Line 11 Zone 1B Division 31 23-Jul-2017 24-Jul-2017 3:00 PM 26-Jul-2017 A Approved Closed
MH-37-L11
Cast in place concrete Form work inspection for RC Stair (Ground
Approved w/
1307 KHEP-CI-1307 Floor)First flight Cluster 13 B2 NA Division 03 23-Jul-2017 24-Jul-2017 10:00 AM 25-Jul-2017 B comments
Closed
Cluster 13, B2
Cast in place concrete Form work inspection for RC Stair (Ground
Approved w/
1308 KHEP-CI-1308 Floor)First flight Cluster 68, B2 NA Division 03 23-Jul-2017 24-Jul-2017 10:00 AM 25-Jul-2017 B comments
Closed
Cluster 68, B2
Cast in place concrete Form work inspection for RC Up stand (First
1309 KHEP-CI-1309 Floor slab) Cluster 01 A6 NA Division 03 24-Jul-2017 26-Jul-2017 10:00 AM 26-Jul-2017 A Approved Closed
Cluster 1, A6
Cast in place concrete Form work inspection for RC Stair (Ground
1310 KHEP-CI-1310 Floor)First flight Cluster 14 B2 NA Division 03 24-Jul-2017 25-Jul-2017 10:00 AM 26-Jul-2017 E Rejected Closed
Cluster 14, B2
Cast in place concrete Form work inspection for RC Stair (Ground
1310.1 KHEP-CI-1310-01 Floor)First flight Cluster 14 B2 NA Division 03 27-Jul-2017 29-Jul-2017 10:00 AM 30-Jul-2017 E Rejected Closed
Cluster 14, B2
Cast in place concrete Form work inspection for RC Stair (Ground
1310.2 KHEP-CI-1310-02 Floor)First flight Cluster 14 B2 NA Division 03 31-Jul-2017 1-Aug-2017 10:00 AM 3-Aug-2017 A Approved Closed
Cluster 14, B2
Cast in place concrete Form work inspection for RC Column (Ground
1311 KHEP-CI-1311 Floor) Axis (B2,B3,D2,D3,A6,E6,A3,E3) Cluster 11 B2 NA Division 03 24-Jul-2017 25-Jul-2017 3:00 PM 26-Jul-2017 E Rejected Closed
Cluster 11, B2
Cast in place concrete Form work inspection for RC Column (Ground
1311.1 KHEP-CI-1311-01 Floor) Axis Excluding (C2,C5,BC5,E5,B6,C6,D6) Cluster 11 B2 NA Division 03 27-Jul-2017 29-Jul-2017 10:30 AM 30-Jul-2017 A Approved Closed
Cluster 11, B2
First Coat, Damp Proofing Installation Inspection for Cmu, Mortar
and Masonry Inspection Under Exterior Reinforced Grad beam Cluster 44,
1312 KHEP-CI-1312
A6
NA Division 07 24-Jul-2017 25-Jul-2017 3:00 PM 26-Jul-2017 E Rejected Closed
Cluster 44, A6
First Coat, Damp Proofing Installation Inspection for CMU, Mortar
and Masonry Inspection Under Exterior Reinforced Grad beam Cluster 44,
1312.1 KHEP-CI-1312-01
A6
NA Division 07 27-Jul-2017 29-Jul-2017 10:00 AM 30-Jul-2017 A Approved Closed
Cluster 44, A6
Inspection of excavated and Compaction formation for Pipe trench
Sewer Maine line Dia 200mm
1313 KHEP-CI-1313
Zone 1B, Line 1, MH-11-L01 to MH-10-L01 and MH-10-L01 to MH-09-
Line 1 Zone 1B Division 31 24-Jul-2017 25-Jul-2017 11:00 AM 26-Jul-2017 A Approved Closed
L01 and MH-09-L01 to MH-08-L01
Compaction test of Sand Filling Above the pipe trench and laying
warning tape Sewer Maine Line Dia 200mm
1314 KHEP-CI-1314 Zone 2B, Line 2, Line 2 Zone 2B Division 31 24-Jul-2017 25-Jul-2017 3:00 PM 27-Jul-2017 A Approved Closed
MH-18-L02 to MH-17-L02 and MH-17-L02 to MH-16-L02 and MH-16-
L02 to MH-15-L02 and MH-15-L02 to MH-14-L02
Compaction test of Sand Filling Above the pipe trench and laying
warning tape Storm Maine Line Dia 400mm
1315 KHEP-CI-1315 Zone 2B, Line 30, Line 30 Zone 2B Division 31 24-Jul-2017 25-Jul-2017 11:00 AM 27-Jul-2017 A Approved Closed
MH-106-L30 to MH-107-L30 and MH-107-L30 to MH-107a-L30 and
MH-107a-L30 to MH-108-L27
Compaction test 1st and final layer Structural fill (Selected fill)
Cluster
1316 KHEP-CI-1316
36,BC4
Zone 2B Division 31 24-Jul-2017 25-Jul-2017 11:30 AM 26-Jul-2017 A Approved Closed
Zone 2B, Cluster 36,BC4
Compaction test 1st and final layer Structural fill (Selected fill)
Cluster
1317 KHEP-CI-1317
77,BC4
Zone 4B Division 31 24-Jul-2017 25-Jul-2017 11:30 AM 26-Jul-2017 A Approved Closed
Zone 4B, Cluster 77,BC4
Cast in place concrete Form work inspection for RC (First Floor slab)
Approved w/
1318 KHEP-CI-1318 Cluster 15 B2 NA Division 03 24-Jul-2017 25-Jul-2017 10:00 AM 26-Jul-2017 B comments
Closed
Cluster 15, B2
Concrete sampling, testing and placement inspection for RC Column
1319 KHEP-CI-1319 (first floor slab) Cluster 01 A6 NA Division 03 25-Jul-2017 26-Jul-2017 9:00 AM 27-Jul-2017 A Approved Closed
Cluster 1, A6
Concrete sampling, testing and placement inspection for RC Footing Cluster 28,
1320 KHEP-CI-1320
Cluster 28, BC4 BC4
NA Division 03 25-Jul-2017 26-Jul-2017 9:00 AM 27-Jul-2017 A Approved Closed
Compaction test of Sand Filling Above the pipe trench and laying
1333 KHEP-CI-1333 warning tape Storm Maine Line Dia 400mm Zone 1B, Line 11, MH- Line 11 Zone 1B Division 31 26-Jul-2017 27-Jul-2017 11:30 AM 29-Jul-2017 A Approved Closed
I33-L11 to MH-I34-L11 and MH-I34-L11 to MH-37-L11
Compaction test of Sand bending under pipe trench sewer main line
Dia 200mm Zone 2B, Line 1,
1334 KHEP-CI-1334
MH-11-L01 to MH-10-L01 and MH-10-L01 to MH-9-L01 and MH-9-
Line 01 Zone 2B Division 31 26-Jul-2017 27-Jul-2017 11:30 AM 30-Jul-2017 A Approved Closed
L01 to MH-8-L01
Compaction test excavated formation level bottom of foundation
Cluster 26 ,
1335 KHEP-CI-1335 Zone
BC-4
Zone 2B Division 31 26-Jul-2017 27-Jul-2017 10:00 AM 29-Jul-2017 A Approved Closed
2B, Cluster 26, BC 4
Concrete sampling, testing and placement inspection for RC Grad
1336 KHEP-CI-1336 Beam Cluster Cluster 10 B2 NA Division 03 26-Jul-2017 27-Jul-2017 9:00 AM 29-Jul-2017 A Approved Closed
10, B2
Installation of reinforcing steel bar, Embedded item and form closure
1337 KHEP-CI-1337 inspection for RC stair (Ground Floor) first flight Cluster 13 B2 NA Division 03 26-Jul-2017 27-Jul-2017 10:00 AM 29-Jul-2017 A Approved Closed
Cluster 13, B2
Installation of reinforcing steel bar, Embedded item and form closure
inspection for RC stair (Ground Floor) first flight
1338 KHEP-CI-1338
Cluster 68,
Cluster 68, B2 NA Division 03 26-Jul-2017 27-Jul-2017 10:00 AM 29-Jul-2017 A Approved Closed
B2
Cast in place concrete formwork inspection for storm manholes-
Approved w/
1339 KHEP-CI-1339 storm main line Line 8 Zone 1B Division 04 26-Jul-2017 27-Jul-2017 10:00 AM 30-Jul-2017 B comments
Closed
Zone 1B, Line 8, MH-26a-L08, M.H Dia 1200
Compaction test of Sand Filling Above the pipe trench and laying
1391 KHEP-CI-1391 warning tape Sewer Maine Line Dia 200mm Zone 2B, Line 27 Zone 2B Division 31 2-Aug-2017 3-Aug-2017 11:30 AM 6-Aug-2017 A Approved Closed
Line 28, MH-1-L28 to MH-1a-L28 and MH-1a-L28 to MH-2-L27
Inspection of Sand filling around the Pipe Storm Maine Line Dia
400mm
1392 KHEP-CI-1392 Zone 1B, Line 13, MH-I39-L13 to MH-I40-L13 and MH-I40- Line 13 Zone 1B Division 31 2-Aug-2017 3-Aug-2017 11:00 AM 5-Aug-2017 A Approved Closed
L13 to MH-I41-L13 and MH-I41-L13 to MH-I42-L13 and MH-I42-L13
to MH-45-L13
Inspection of Sand filling around the Pipe Sewer Maine Line Dia
200mm
1393 KHEP-CI-1393 Zone 1B, Line 2, MH-14-L02 to MH-13-L02 and MH-13-L02 Line 2 Zone 1B Division 31 2-Aug-2017 3-Aug-2017 10:30 AM 5-Aug-2017 A Approved Closed
to MH-12-L02 and MH-12-L02 to MH-11-L02 and MH-11-L02 to MH-
10-L02 and MH-10-L02 to MH-09-L02
Blinding concrete sampling, Testing & placement inspection for
1394 KHEP-CI-1394 Manhole Storm Main Line Line 13 Zone 1B Division 03 2-Aug-2017 3-Aug-2017 10:00 AM 5-Aug-2017 A Approved Closed
Zone 1B, Line 13, MH-I42-L13
Back filling General Fill Final Layer for pipe trench - Storm Maine line
Dia 400mm Approved w/
1395 KHEP-CI-1395
Zone 2B, Line 1, MH-3-L01 to MH-6-L01 and MH-6-L01
Line 1 Zone 2B Division 31 3-Aug-2017 5-Aug-2017 11:00 AM 5-Aug-2017 B comments
Closed
to MH-132-L35
Concrete sampling , testing and placement inspection for RC Grade
1396 KHEP-CI-1396 Beam Cluster 5, B2 NA Division 03 3-Aug-2017 5-Aug-2017 9:30 AM 5-Aug-2017 A Approved Closed
Cluster 5, B2
70 cm, CMU,morter and masonry inspection under exterior reinforced
1397 KHEP-CI-1397 Grad Beam Cluster 19 B2 NA Division 04 3-Aug-2017 5-Aug-2017 2:30 PM 7-Aug-2017 A Approved Closed
Cluster 19, B2
Installation of reinforcing steel bar, Embedded item and form closure
Cluster 18
1398 KHEP-CI-1398 inspection for RC Column Neck
BC4
NA Division 03 3-Aug-2017 5-Aug-2017 3:00 PM 6-Aug-2017 A Approved Closed
Cluster 18, BC4
Installation of reinforcing steel bar, Embedded item and form closure
inspection for RC Column (Ground Floor) Excluding Axis
1399 KHEP-CI-1399
(B2,B3,D2,D3,A6,E6,A3,E3)
Cluster 17 B2 NA Division 03 3-Aug-2017 5-Aug-2017 10:30 AM 6-Aug-2017 A Approved Closed
Cluster 17, B2
Installation of reinforcing steel bar, Embedded item and form closure
inspection for RC Column (Ground Floor) Excluding Axis
1400 KHEP-CI-1400
(B2,B3,D2,D3,A6,E6,A3,E3)
Cluster 15 B2 NA Division 03 3-Aug-2017 5-Aug-2017 10:30 AM 6-Aug-2017 A Approved Closed
Cluster 15, B2
Installation of reinforcing steel bar, Embedded item and form closure
inspection for RC Column (First Floor) Axis (K-N) Excluding Axis
1401 KHEP-CI-1401
(K2,K3,L2,M2,M3)
Cluster 02 A6 NA Division 03 3-Aug-2017 5-Aug-2017 9:00 AM 6-Aug-2017 A Approved Closed
Cluster 2, A6
Cast in place concrete Form work inspection for RC First Floor Slab
1422 KHEP-CI-1422 Cluster 13 B2 NA Division 03 6-Aug-2017 7-Aug-2017 10:30 AM 9-Aug-2017 A Approved Closed
Cluster 13, B2
Back filling General Fill final Layer for pipe trench - Sewer Maine line
Dia 200mm
Approved w/
1425 KHEP-CI-1425 Zone 2B, Line 30 & 29, MH-3-L30 to MH-2-L30 and MH-2-L30 to Line 30 & 29 Zone 2B Division 31 6-Jul-2017 7-Jul-2017 11:00 AM 8-Aug-2017 B comments
Closed
MH-1-L30 and MH-1-L30 to MH-1a-L30 and MH-1a-L30 to MH-11-
L02 and MH-1-L29 to MH-1a-L29 and MH-1a-L29 to MH-1-L30
Compaction test of Sand Filling Above the pipe trench and laying
Approved w/
1432 KHEP-CI-1432 warning tape Sewer Maine Line Dia 200mm Zone 4B, Line Line 17 Zone 4B Division 31 7-Aug-2017 8-Aug-2017 11:30 AM 9-Aug-2017 B comments
Closed
17, MH-1-L17 to MH-17-L01
Back filling General Fill final Layer for pipe trench - Sewer Maine line
Dia 200mm
Approved w/
1433 KHEP-CI-1433 Zone 2B, Line 9 & 10, MH-3-L09 to MH-2-L09 and MH-2-L09 to Line 9 & 10 Zone 2B Division 31 7-Aug-2017 8-Aug-2017 11:00 AM 9-Aug-2017 B comments
Closed
MH-1-L09 and MH-1-L09 to MH-1a-L09 and MH-1a-L09 to MH-9-L01
and MH-1-L10 to MH-1a-L10 and MH-1a-L10 to MH-1-L09
Inspection of Sand filling around the Pipe Sewer Maine Line Dia
200mm
1449 KHEP-CI-1449 Zone 2B, Line 1, MH-14-L01 to MH-13-L01 and MH-13-L01 to Line 1 Zone 2B Division 31 8-Aug-2017 9-Aug-2017 3:00 PM 10-Aug-2017 A Approved Closed
MH-12-L01 and MH-12-L01 to MH-11-L01 and MH-11-L01 to MH-10-
L01 and MH-10-L01 to MH-9-L01 and MH-9-L01 to MH-8-L01
Compaction test of Sand Filling Above the pipe trench and laying
warning tape Sewer Maine Line Dia 200mm Zone 2B, Line
Approved w/
1450 KHEP-CI-1450 12 & 11, MH-3-L12 to MH-2-L12 and MH-2-L12 to MH-1-L12 and Line 12 & 11 Zone 2B Division 31 8-Aug-2017 9-Aug-2017 11:30 AM 10-Aug-2017 B comments
Closed
MH-1-L12 to MH-12-L01 and MH-1-L11 to MH-1a-L11 and MH-1a-
L11 to MH-2-L11
Concrete sampling , testing and placement inspection for RC First
Approved w/
1451 KHEP-CI-1451 floor Slab Cluster 13 B2 NA Division 03 9-Aug-2017 10-Aug-2017 9:00 AM 14-Aug-2017 B comments
Closed
Cluster 13, B2
Concrete sampling , testing and placement inspection for RC Grade
Approved w/
1452 KHEP-CI-1452 Beam Cluster 13 B2 NA Division 03 9-Aug-2017 10-Aug-2017 9:00 AM 10-Aug-2017 B comments
Closed
Cluster 13, B2
Cast in place concrete Form work inspection for RC Column Neck
Cluster 23,
1453 KHEP-CI-1453
BC4
NA Division 03 9-Aug-2017 10-Aug-2017 3:00 PM 14-Aug-2017 A Approved Closed
Cluster 23, BC4
Installation of reinforcing steel bar, Embedded item and form closure
inspection for RC Column (First Floor) Axis Excluding
1454 KHEP-CI-1454
(B2,B3,D2,D3,A6,E6,A3,E3)
Cluster 13 B2 NA Division 03 9-Aug-2017 10-Aug-2017 2:00 PM 10-Aug-2017 A Approved Closed
Cluster 13, B2
Installation of reinforcing steel bar, Embedded item and form closure
inspection for RC Column (First Floor) Axis
1455 KHEP-CI-1455
(B2,B3,D2,D3,A6,E6,A3,E3)
Cluster 15 B2 NA Division 03 9-Aug-2017 10-Aug-2017 10:00 AM 12-Aug-2017 A Approved Closed
Cluster 15, B2
Termite control surface preparation, installation and final inspection
1456 KHEP-CI-1456 for Grade Beam Cluster 4, A6 NA Division 03 9-Aug-2017 10-Aug-2017 2:30 PM 12-Aug-2017 A Approved Closed
Cluster 4, A6
Blinding concrete sampling, Testing & placement inspection for
Grade Beam
1457 KHEP-CI-1457
Cluster 4, A6
Cluster 4, A6 NA Division 03 9-Aug-2017 10-Aug-2017 2:30 PM 14-Aug-2017 A Approved Closed
Compaction test of Sand Filling Above the pipe trench and laying
warning tape Sewer Maine Line Dia 200mm
Approved w/
1458 KHEP-CI-1458 Zone 2B, Line 2 , MH-14-L02 to MH-13-L02 and MH-13-L02 Line 2 Zone 2B Division 31 9-Aug-2017 10-Aug-2017 10:30 AM 12-Aug-2017 B comments
Closed
to MH-12-L02 and MH-12-L02 to MH-11-L02 and MH-11-L02 to MH-
10-L02 and MH-10-L02 to MH-9-L02
Compaction test of sand bedding under pipe trench - Storm main
Approved w/
1459 KHEP-CI-1459 line Dia 800mm (Along Road 2) Line 26 Zone 5B Division 31 9-Aug-2017 10-Aug-2017 10:15 AM 12-Aug-2017 B comments
Closed
Zone 5B, Line 26, MH-125-L26 to MH-126-L26
Compaction test Last and final layer General fill Cluster 44, Approved w/
1460 KHEP-CI-1460
Zone 1A, Cluster 44, A6 A6
Zone 1A Division 31 10-Aug-2017 12-Aug-2017 10:15 AM 13-Aug-2017 B comments
Closed
Cluster 2, A6
Cast in place concrete Form work inspection for RC Stair (First Floor
1467 KHEP-CI-1467 Ground floor) Cluster 11 B2 NA Division 31 10-Aug-2017 12-Aug-2017 10:30 AM 14-Aug-2017 A Approved Closed
Cluster 11, B2
Installation of reinforcing steel bar, Embedded item and form closure
inspection for RC Stair (First Floor Ground floor)
1468 KHEP-CI-1468
Cluster
Cluster 11 B2 NA Division 31 10-Aug-2017 12-Aug-2017 10:30 AM 14-Aug-2017 A Approved Closed
11, B2
Compaction test 1st and final layer General fill (Bottom of
Cluster 41,
1469 KHEP-CI-1469 Foundation)
BC4
Zone 2B Division 31 10-Aug-2017 12-Aug-2017 11:30 AM 14-Aug-2017 A Approved Closed
Zone 2B, Cluster 41, BC4
Compaction test 1st and final layer General fill (Bottom of
Cluster 42,
1470 KHEP-CI-1470 Foundation)
BC4
Zone 2B Division 31 10-Aug-2017 12-Aug-2017 11:00 AM 14-Aug-2017 A Approved Closed
Zone 2B, Cluster 42, BC4
Compaction test of sand bedding under pipe trench - Storm main
line Dia 400mm Zone Approved w/
1471 KHEP-CI-1471
4B, Line 25 & 24, MH-94-L25 to MH-95-L25 and MH-95-L24 to MH-
Line 25 & 24 Zone 4B Division 31 10-Aug-2017 12-Aug-2017 11:00 AM 13-Aug-2017 B comments
Closed
93-L24
Compaction test of Sand Filling Above the pipe trench and laying
warning tape Storm Maine Line Dia 800mm Zone 4B, Line 27 Approved w/
1472 KHEP-CI-1472
, MH-114-L27 to MH-111a-L27 and MH-111a-L27 to MH-111-L27
Line 27 Zone 4B Division 31 10-Aug-2017 12-Aug-2017 11:00 AM 13-Aug-2017 B comments
Closed
and MH-111-L27 to MH-110a-L27 and MH-110a-L27 to MH-108-L27
Compaction test of Sand Filling Above the pipe trench and laying
warning tape Storm Maine Line Dia 400mm Zone 1B, Line 13 Approved w/
1478 KHEP-CI-1478
, MH-I39-L13 to MH-I40-L13 and MH-I40-L13 to MH-I41-L13 and
Line 13 Zone 1B Division 31 12-Aug-2017 13-Aug-2017 11:00 AM 14-Aug-2017 B comments
Closed
MH-I41-L13 to MH-I42-L13 and MH-I42-L13 to MH-45-L13
Compaction test of Sand Filling Above the pipe trench and laying
Approved w/
1479 KHEP-CI-1479 warning tape Storm Maine Line Dia 400mm Zone 1B, Line 16 Line 16 Zone 1B Division 31 12-Aug-2017 13-Aug-2017 10:30 AM 14-Aug-2017 B comments
Closed
, MH-I53-L16 to MH-54-L15
Compaction test of sand bedding under pipe trench - Storm main
line Dia 800mm Zone Approved w/
1480 KHEP-CI-1480
4B, Line 27, MH-114-L27 to MH-115-L27 and MH-115-L27 to MH-
Line 27 Zone 4B Division 31 12-Aug-2017 13-Aug-2017 10:30 AM 14-Aug-2017 B comments
Closed
116-L27 and MH-116-L27 to MH-117-L27
Compaction test of sand bedding under pipe trench - Storm main
line Dia 800mm Zone Approved w/
1481 KHEP-CI-1481
4B, Line 26, MH-117-L27 to MH-118-L26 and MH-118-L26 to MH-
Line 26 Zone 4B Division 31 12-Aug-2017 13-Aug-2017 10:30 AM 14-Aug-2017 B comments
Closed
119-L26 and MH-119-L26 to MH-120-L26
Back filling General Fill final Layer for pipe trench - Storm Maine line
1482 KHEP-CI-1482 Dia 400mm Line 10 Zone 1B Division 31 12-Aug-2017 13-Aug-2017 10:00 AM 14-Aug-2017 A Approved Closed
Zone 1B, Line 10, MH-I31-L10 to MH-32-L10
Back filling General Fill final Layer for pipe trench - Storm Maine line
Dia 400mm
1483 KHEP-CI-1483
Zone 1B, Line 11, MH-I33-L11 to MH-I34-L11 and MH-I34-L11 to
Line 11 Zone 1B Division 31 12-Aug-2017 13-Aug-2017 10:00 AM 14-Aug-2017 A Approved Closed
MH-37-L11
Second Coat, Damp Proofing Installation Inspection for CMU, Mortar
and Masonry Inspection Under Exterior Reinforced Grad beam
1484 KHEP-CI-1484 Cluster 73, B2 NA Division 07 12-Aug-2017 13-Aug-2017 10:00 AM 14-Aug-2017 A Approved Closed
Cluster 73, B2
Second Coat, Damp Proofing Installation Inspection for CMU, Mortar
and Masonry Inspection Under Exterior Reinforced Grad beam
1485 KHEP-CI-1485 Cluster 19 B2 NA Division 07 12-Aug-2017 13-Aug-2017 10:00 AM 14-Aug-2017 A Approved Closed
Cluster 19, B2
First Coat, Damp Proofing Installation Inspection for CMU, Mortar
and Masonry Inspection Under Exterior Reinforced Grad beam Cluster 6,
1486 KHEP-CI-1486
BC4
NA Division 07 12-Aug-2017 13-Aug-2017 11:00 AM 14-Aug-2017 A Approved Closed
Cluster 6, BC4
First Coat, Damp Proofing Installation Inspection for CMU, Mortar
and Masonry Inspection Under Exterior Reinforced Grad beam
1487 KHEP-CI-1487 Cluster 8, B2 NA Division 07 12-Aug-2017 13-Aug-2017 11:00 AM 14-Aug-2017 A Approved Closed
Cluster 8, B2
Cast in place concrete Form work inspection for RC Column (First
1488 KHEP-CI-1488 Floor) Axis (B2,B3,D2,D3,A6,E6,A3,E3) Cluster 15 B2 NA Division 03 12-Aug-2017 13-Aug-2017 2:00 PM 14-Aug-2017 A Approved Closed
Cluster 15, B2
Cast in place concrete Form work inspection for RC Column (First
1489 KHEP-CI-1489 Floor) Axis (G2,J1,L2,N4) Cluster 02 A6 NA Division 03 12-Aug-2017 13-Aug-2017 3:00 PM 15-Aug-2017 A Approved Closed
Cluster 2, A6
Termite control surface preparation, installation and final inspection
1490 KHEP-CI-1490 for Footing Cluster 56, B2 NA Division 03 12-Aug-2017 13-Aug-2017 3:00 PM 14-Aug-2017 A Approved Closed
Cluster 56, B2
Blinding concrete sampling, Testing & placement inspection for
Cluster 56,
1491 KHEP-CI-1491 Footing Cluster
BC4
NA Division 03 12-Aug-2017 13-Aug-2017 3:00 PM 15-Aug-2017 A Approved Closed
56, BC4
Cast in place concrete Form work inspection for RC First Floor Slab &
1492 KHEP-CI-1492 Stair Cluster 14 B2 NA Division 03 12-Aug-2017 13-Aug-2017 2:00 PM 14-Aug-2017 A Approved Closed
Cluster 14, B2
Installation of reinforcing steel bar, Embedded item and form closure
1493 KHEP-CI-1493 inspection for RC First Floor Slab & Stair Cluster 14 B2 NA Division 03 12-Aug-2017 13-Aug-2017 2:00 PM 14-Aug-2017 A Approved Closed
Cluster 14, B2
Installation of reinforcing steel bar, Embedded item and form closure
inspection for RC Column (Ground Floor) Excluding
1494 KHEP-CI-1494
(B2,B3,C2,D2,D3,F2,F3,G2,H2,H3,K2,K3,L2,M2,M3)
Cluster 3, A6 NA Division 03 13-Aug-2017 14-Aug-2017 2:00 PM 16-Aug-2017 A Approved Closed
Cluster 3, A6
Installation of reinforcing steel bar, Embedded item and form closure
inspection for RC Column (Ground Floor) Excluding
1495 KHEP-CI-1495
(B2,B3,D2,D3,A6,E6,A3,E3)
Cluster 5, B2 NA Division 03 13-Aug-2017 14-Aug-2017 2:00 PM 16-Aug-2017 A Approved Closed
Cluster 5, B2
Second Coat, Damp Proofing Installation Inspection for RC footing &
Cluster 21,
1496 KHEP-CI-1496 Column Neck
BC4
NA Division 07 13-Aug-2017 14-Aug-2017 10:00 AM 15-Aug-2017 A Approved Closed
Cluster 21, BC4
Inspection of excavated and Compaction formation for Pipe trench
Storm Maine line Dia 400mm Zone
1497 KHEP-CI-1497 2B, Line 4 & 5, MH-I10-L04 to MH-I12-L04 and MH-I12-L04 to MH- Line 4 & 5 Zone 2B Division 31 13-Aug-2017 14-Aug-2017 11:30 AM 16-Aug-2017 A Approved Closed
I13-L04 and MH-I13-L04 to MH-15-L04 and MH-I12-L04 to MH-I11-
L05
Inspection of Sand filling around the Pipe Storm Maine Line Dia
Approved w/
1499 KHEP-CI-1499 800mm Line 26 Zone 4B Division 31 13-Aug-2017 14-Aug-2017 3:00 PM 15-Aug-2017 B comments
Closed
Zone 4B, Line 26, MH-125-L26 to MH-126-L26
Inspection of Sand filling around the Pipe Sewer Maine Line Dia
200mm
Approved w/
1500 KHEP-CI-1500 Zone 3B, Line 23 & 24, MH-2-L23 to MH-1-L23 and MH-1-L23 Line 23 & 24 Zone 3B Division 31 13-Aug-2017 14-Aug-2017 11:15 AM 15-Aug-2017 B comments
Closed
to MH-1a-L23 and MH-1a-L23 to MH-17-L02 and MH-1-L24 to MH-
1a-L24 and MH-1a-L24 to MH-1-L23
Termite control surface preparation, installation and final inspection
Cluster 36,
1501 KHEP-CI-1501 for Footing
BC4
NA Division 03 13-Aug-2017 14-Aug-2017 3:00 PM 16-Aug-2017 A Approved Closed
Cluster 36, BC4
Blinding concrete sampling, Testing & placement inspection for
Cluster 36,
1502 KHEP-CI-1502 Footing
BC4
NA Division 03 13-Aug-2017 14-Aug-2017 3:00 PM 15-Aug-2017 A Approved Closed
Cluster 36, BC4
Termite control surface preparation, installation and final inspection
Cluster 37,
1503 KHEP-CI-1503 for Footing
BC4
NA Division 03 13-Aug-2017 14-Aug-2017 3:00 PM 16-Aug-2017 A Approved Closed
Cluster 37, BC4
Blinding concrete sampling, Testing & placement inspection for
Cluster 37,
1504 KHEP-CI-1504 Footing
BC4
NA Division 03 13-Aug-2017 14-Aug-2017 3:00 PM 15-Aug-2017 A Approved Closed
Cluster 37, BC4
First Coat, Damp Proofing Installation Inspection for CMU, Mortar
and Masonry Inspection Under Exterior Reinforced Grad beam
1505 KHEP-CI-1505 Cluster 20 B2 NA Division 07 14-Aug-2017 15-Aug-2017 11:00 AM 16-Aug-2017 A Approved Closed
Cluster 20, B2
Cast in place concrete Form work inspection for RC Column Neck
Cluster 18
1506 KHEP-CI-1506
BC4
NA Division 03 14-Aug-2017 15-Aug-2017 3:00 PM 16-Aug-2017 A Approved Closed
Cluster 18, BC4
70 cm, CMU,morter and masonry inspection under exterior reinforced
Cluster 43,
1507 KHEP-CI-1507 Grad Beam Cluster
A6
NA Division 04 14-Aug-2017 15-Aug-2017 3:00 PM 15-Aug-2017 A Approved Closed
43, A6
Cast in place concrete Form work inspection for RC Column (First
Floor) Excluding Axis (B2,B3,D2,D3,A6,E6,A3,E3)
1508 KHEP-CI-1508
Cluster 13,
Cluster 13 B2 NA Division 03 14-Aug-2017 15-Aug-2017 3:00 PM 16-Aug-2017 A Approved Closed
B2
Compaction test last and final layer General fill (Around footing)
Cluster 16
1509 KHEP-CI-1509
BC4
Zone 1B Division 31 14-Aug-2017 15-Aug-2017 11:00 AM 17-Aug-2017 A Approved Closed
Zone 1B, Cluster 16, BC4
Compaction test last and final layer General fill (Around footing)
Cluster 75,
1510 KHEP-CI-1510
BC4
Zone 4B Division 31 14-Aug-2017 15-Aug-2017 11:15 AM 17-Aug-2017 A Approved Closed
Zone 4B, Cluster 75, BC4
Inspection of Sand filling around the Pipe Storm Maine Line Dia
Approved w/
1511 KHEP-CI-1511 500mm Line 18 Zone 2B Division 31 14-Aug-2017 15-Aug-2017 11:10 AM 17-Aug-2017 B comments
Closed
Zone 2B, Line 18, MH-61-L18 to MH-62-L18
Inspection of Reinforcement steel bar for storm Manholes Storm
1512 KHEP-CI-1512 main line Line 8 Zone 1B Division 31 14-Aug-2017 15-Aug-2017 10:00 AM 17-Aug-2017 A Approved Closed
Zone 1B, Line 8, MH-21-L08 M.H.Dia 1200
Second Coat, Damp Proofing Installation Inspection for CMU, Mortar
and Masonry Inspection Under Exterior Reinforced Grad beam Cluster 6,
1513 KHEP-CI-1513
BC4
NA Division 07 14-Aug-2017 15-Aug-2017 10:00 AM 15-Aug-2017 A Approved Closed
Cluster 6, BC4
Second Coat, Damp Proofing Installation Inspection for CMU, Mortar
and Masonry Inspection Under Exterior Reinforced Grad beam
1514 KHEP-CI-1514 Cluster 8, B2 NA Division 07 14-Aug-2017 15-Aug-2017 10:30 AM 16-Aug-2017 A Approved Closed
Cluster 8, B2
Concrete sampling , testing and placement inspection for RC Column
Approved w/
1515 KHEP-CI-1515 (Ground floor) Cluster 17 B2 NA Division 03 15-Aug-2017 16-Aug-2017 9:00 AM 17-Aug-2017 B comments
Closed
Cluster 17, B2
Concrete sampling , testing and placement inspection for RC Column
Approved w/
1516 KHEP-CI-1516 (First floor) Cluster 15 B2 NA Division 03 15-Aug-2017 16-Aug-2017 9:00 AM 17-Aug-2017 B comments
Closed
Cluster 15, B2
Concrete sampling , testing and placement inspection for RC Column
Cluster 23,
1517 KHEP-CI-1517 Neck
BC4
NA Division 03 15-Aug-2017 16-Aug-2017 9:00 AM 17-Aug-2017 E Rejected Closed
Cluster 23, BC4
Concrete sampling , testing and placement inspection for RC Column
Cluster 23,
1517.1 KHEP-CI-1517-01 Neck
BC4
NA Division 03 23-Aug-2017 24-Aug-2017 9:00 AM 26-Aug-2017 A Approved Closed
Cluster 23, BC4
Concrete sampling , testing and placement inspection for RC First
Approved w/
1518 KHEP-CI-1518 Floor Slab Cluster 14 B2 NA Division 03 15-Aug-2017 16-Aug-2017 9:00 AM 17-Aug-2017 B comments
Closed
Cluster 14, B2
Concrete sampling , testing and placement inspection for RC Grade
Approved w/
1519 KHEP-CI-1519 Beam Cluster 7, B2 NA Division 03 15-Aug-2017 16-Aug-2017 9:00 AM 17-Aug-2017 B comments
Closed
Cluster 7, B2
Concrete sampling , testing and placement inspection for RC Stair
Approved w/
1520 KHEP-CI-1520 First Flight Cluster 11 B2 NA Division 03 15-Aug-2017 16-Aug-2017 9:00 AM 17-Aug-2017 B comments
Closed
Cluster 11, B2
Termite control surface preparation, installation and final inspection
Cluster 16
1521 KHEP-CI-1521 for Grade Beam
BC4
NA Division 03 15-Aug-2017 16-Aug-2017 3:00 PM 19-Aug-2017 A Approved Closed
Cluster 16, BC4
Blinding concrete sampling, Testing & placement inspection for
Cluster 16 Approved w/
1522 KHEP-CI-1522 Grade Beam
BC4
NA Division 03 15-Aug-2017 16-Aug-2017 3:00 PM 19-Aug-2017 B comments
Closed
Cluster 16, BC4
Termite control surface preparation, installation and final inspection
Cluster 25,
1523 KHEP-CI-1523 for Footing
BC4
NA Division 03 15-Aug-2017 16-Aug-2017 3:00 PM 19-Aug-2017 A Approved Closed
Cluster 25, BC4
Blinding concrete sampling, Testing & placement inspection for
Cluster 25, Approved w/
1524 KHEP-CI-1524 Footing
BC4
NA Division 03 15-Aug-2017 16-Aug-2017 3:00 PM 19-Aug-2017 B comments
Closed
Cluster 25, BC4
Cast in place concrete Form work inspection for RC Footing
Cluster 60,
1525 KHEP-CI-1525
BC4
NA Division 03 15-Aug-2017 16-Aug-2017 10:00 AM 19-Aug-2017 A Approved Closed
Cluster 60, BC4
Installation of reinforcing steel bar, Embedded item and form closure
Cluster 60,
1526 KHEP-CI-1526 inspection for RC Footing Cluster 60,
BC4
NA Division 03 15-Aug-2017 16-Aug-2017 10:30 AM 19-Aug-2017 A Approved Closed
BC4
Cast in place concrete Form work inspection for RC Column (Ground
1527 KHEP-CI-1527 Floor) Excluding Axis (B2,B3,D2,D3,A6,E6,A3,E3) Cluster 5, B2 NA Division 03 15-Aug-2017 16-Aug-2017 3:00 PM 19-Aug-2017 A Approved Closed
Cluster 5, B2
Inspection of Reinforcement steel bar and internal Shutter for
manholes (Precast yard)
1528 KHEP-CI-1528
Zone 1B, Line 15 &14, MH-46-L15 and MH-47-L15 and MH-48-L15
Line 15 &14 Zone 1B Division 31 15-Aug-2017 16-Aug-2017 10:00 AM 17-Aug-2017 A Approved Closed
and MH-43-L14
Compaction test of sand bedding under pipe trench - Sewer main
line Dia 400mm
Approved w/
1529 KHEP-CI-1529 Zone 2B, Line 4 & 5, MH-I10-L04 to MH-I12-L04 and MH-I12-L04 to Line 4 & 5 Zone 2B Division 31 15-Aug-2017 16-Aug-2017 11:30 AM 17-Aug-2017 B comments
Closed
MH-I13-L04 and MH-I3a-L04 to MH-15-L04 and MH-I12-L04 to MH-
I11-L05
Compaction test of Sand Filling Above the pipe trench and laying
warning tape Sewer Maine Line Dia 200mm Zone 2B,
Approved w/
1530 KHEP-CI-1530 Line 1 , MH-14-L01 to MH-13-L01 and MH-13-L01 to MH-12-L01 and Line 1 Zone 2B Division 31 15-Aug-2017 16-Aug-2017 3:00 PM 17-Aug-2017 B comments
Closed
MH-12-L01 to MH-11-L01 and MH-11-L01 to MH-10-L01 and MH-10-
L01 to MH-9-L01 and MH-9-L01 to MH-8-L01
Inspection of Sand Filling Around pipe Sewer Maine Line Dia 200mm
Inspection Form work for base & wall and concrete pouring for Storm
Manholes (Precast yard)
1542 KHEP-CI-1542
Zone 1B, Line 15 & 14, MH-46-L15 and MH-47-L15 and MH-48-L15
Line 15 & 14 Zone 1B Division 31 16-Aug-2017 17-Aug-2017 3:00 PM 19-Aug-2017 A Approved Closed
and MH-43-L14
Inspection Form work for base & wall and concrete pouring for Storm
1543 KHEP-CI-1543 Manholes (In Site) Zone Line 18 Zone 1B Division 31 16-Aug-2017 17-Aug-2017 3:00 PM 19-Jul-2017 E Rejected Closed
1B, Line 18, MH-21-L08 M.H Dia 1200
Inspection Form work for base & wall and concrete pouring for Storm
1543.1 KHEP-CI-1543-01 Manholes (In Site) Zone Line 18 Zone 1B Division 31 20-Aug-2017 21-Aug-2017 10:00 AM 22-Aug-2017 A Approved Closed
1B, Line 18, MH-21-L08 M.H Dia 1200
Termite control surface preparation, installation and final inspection
1544 KHEP-CI-1544 for Grade Beam Cluster 75, B2 NA Division 03 17-Aug-2017 19-Aug-2017 10:00 AM 23-Aug-2017 A Approved Closed
Cluster 75, B2
Blinding concrete sampling, Testing & placement inspection for
1545 KHEP-CI-1545 Grade Beam Cluster 75, B2 NA Division 03 17-Aug-2017 19-Aug-2017 10:30 AM 24-Aug-2017 A Approved Closed
Cluster 75, B2
Termite control surface preparation, installation and final inspection
1546 KHEP-CI-1546 for Grade Beam Cluster 71, B2 NA Division 03 17-Aug-2017 19-Aug-2017 10:00 AM 23-Aug-2017 A Approved Closed
Cluster 71, B2
Blinding concrete sampling, Testing & placement inspection for
1547 KHEP-CI-1547 Grade Beam Cluster 71, B2 NA Division 03 17-Aug-2017 19-Aug-2017 10:30 AM 24-Aug-2017 A Approved Closed
Cluster 71, B2
70 cm, CMU,morter and masonry inspection under exterior reinforced
1548 KHEP-CI-1548 Grad Beam Cluster Cluster 72, B2 NA Division 04 17-Aug-2017 19-Aug-2017 11:00 AM 19-Aug-2017 A Approved Closed
72, B2
Concrete sampling , testing and placement inspection for RC Column
1549 KHEP-CI-1549 (First Floor) Cluster 02 A6 NA Division 03 17-Aug-2017 19-Aug-2017 9:00 AM 19-Aug-2017 A Approved Closed
Cluster 2, A6
Concrete sampling , testing and placement inspection for RC Column
Cluster 18
1550 KHEP-CI-1550 Neck
BC4
NA Division 03 17-Aug-2017 19-Aug-2017 9:00 AM 19-Aug-2017 A Approved Closed
Cluster 18, BC4
Compaction test Excavated formation level of Foundation Zone 4B, Cluster 74,
1551 KHEP-CI-1551
Cluster 74, BC4 BC4
Zone 4B Division 31 17-Aug-2017 19-Aug-2017 11:15 AM 21-Aug-2017 A Approved Closed
Compaction test 1st and final layer Structural fill (Selected fill) Cluster 42,
1552 KHEP-CI-1552
Zone 2B, Cluster 42, BC4 BC4
Zone 2B Division 31 17-Aug-2017 19-Aug-2017 11:30 AM 21-Aug-2017 A Approved Closed
Compaction test of Sand Filling Above the pipe trench and laying
warning tape Sewer Maine Line Dia 200mm Zone 3B,
1564 KHEP-CI-1564 Line 26 & 25 , MH-4-L26 to MH-3-L26 and MH-3-L26 to MH-2-L26 Line 26 & 25 Zone 3B Division 31 19-Aug-2017 20-Aug-2017 11:00 AM 21-Aug-2017 A Approved Closed
and MH-1-L26 to MH-1a-L26 and MH-1a-L26 to MH-15-L02 and MH-
1-L25 to MH-1a-L25 and MH-1a-L25 to MH-1-L26
Compaction test 1st and final layer Structural fill (Selected fill) Zone Cluster
1578 KHEP-CI-1578
2B, Cluster 41,BC4 41,BC4
Zone 2B Division 31 21-Aug-2017 22-Aug-2017 10:30 AM 24-Aug-2017 A Approved Closed
Cast in place concrete Form work inspection for RC Footing Cluster Cluster 25,
1592 KHEP-CI-1592
25, BC4 BC4
NA Division 03 22-Aug-2017 23-Aug-2017 3:00 PM 24-Aug-2017 E Rejected Closed
Cast in place concrete Form work inspection for RC Footing Cluster Cluster 25,
1592.1 KHEP-CI-1592-01
25, BC4 BC4
NA Division 03 26-Aug-2017 27-Aug-2017 10:00 AM 29-Aug-2017 A Approved Closed
Inspection of Sand Filling Around pipe Sewer Maine Line Dia 200mm
Approved w/
1598 KHEP-CI-1598 Zone 3B, Line 16 & 15 , MH-4-L16 to MH-3-L16 and MH-3-L16 Line 16 & 15 Zone 3B Division 31 23-Aug-2017 24-Aug-2017 11:00 AM 26-Aug-2017 B comments
Closed
to MH-3a-L16 and MH-3a-L16 to MH-2-L16 and MH-2-L16 to MH-1-
L16 and MH-1-L16 to MH-16-L01 and MH-1-L15 to MH-2-L16
Compaction test 1st and final layer Structural fill (Selected fill) Cluster
1599 KHEP-CI-1599
Zone 2B, Cluster 40,BC4 40,BC4
Zone 2B Division 31 23-Aug-2017 24-Aug-2017 10:30 AM 26-Aug-2017 A Approved Closed
Back filling General Fill final Layer for pipe trench - Sewer Maine line
Dia 200mm
Zone 2B, Line 27 & 28, MH-5-L27 to MH-4-L27 and MH-4-L27 to Approved w/
1600 KHEP-CI-1600
MH-3-L27 and MH-3-L27 to MH-2-L27 and MH-2-L27 to MH-1-L27
Line 27 & 28 Zone 2B Division 31 23-Aug-2017 24-Aug-2017 10:00 AM 26-Aug-2017 B comments
Closed
and MH-1-L27 to MH-13-L02 and MH-1-L26 to MH-1a-L26 and MH-
1a-L26 to MH-2-L27
Concrete sampling , testing and placement inspection for RC Footing
Cluster 60, Approved w/
1601 KHEP-CI-1601
BC4
NA Division 03 23-Aug-2017 24-Aug-2017 9:00 AM 26-Aug-2017 B comments
Closed
Cluster 60, BC4
Concrete sampling , testing and placement inspection for RC Footing
Cluster 22, Approved w/
1602 KHEP-CI-1602
BC4
NA Division 03 23-Aug-2017 24-Aug-2017 9:00 AM 26-Aug-2017 B comments
Closed
Cluster 22, BC4
Concrete sampling , testing and placement inspection for RC Column
Approved w/
1603 KHEP-CI-1603 (First Floor) Cluster 14 B2 NA Division 03 23-Aug-2017 24-Aug-2017 9:00 AM 28-Aug-2017 B comments
Closed
Cluster 14, B2
Concrete sampling , testing and placement inspection for RC First
1604 KHEP-CI-1604 Floor Slab Cluster 12 B2 NA Division 03 23-Aug-2017 24-Aug-2017 9:00 AM 26-Aug-2017 A Approved Closed
Cluster 12, B2
Concrete sampling , testing and placement inspection for RC Column
Approved w/
1605 KHEP-CI-1605 (Ground Floor) Cluster 5, B2 NA Division 03 23-Aug-2017 24-Aug-2017 9:00 AM 28-Aug-2017 B comments
Closed
Cluster 5, B2
Installation of reinforcing steel bar, Embedded item and form closure
Cluster 22,
1606 KHEP-CI-1606 inspection for RC Column Neck Cluster 22,
BC4
NA Division 03 23-Aug-2017 24-Aug-2017 3:00 PM 26-Aug-2017 A Approved Closed
BC4
Compaction test of Sand Filling Above the pipe trench and laying
warning tape Sewer Maine Line Dia 200mm Zone 3B,
Approved w/
1643 KHEP-CI-1643 Line 16 & 15, MH-4-L16 to MH-3-L16 and MH-3-L16 to MH-3a-L16 Line 16 & 15 Zone 3B Division 31 28-Aug-2017 29-Aug-2017 11:30 AM 29-Aug-2017 B comments
Closed
and MH-3a-L16 to MH-2-L16 and MH-2-L16 to MH-1-L16 and MH-1-
L16 to MH-16-L01 and MH-1-L15 to MH-2-L16
Inspection of Sand Filling Around pipe Sewer Maine Line Dia 200mm
1644 KHEP-CI-1644 Zone 3B, Line 14 & 13 , MH-2-L14 to MH-1-L14 and MH-1-L14 Line 14 & 13 Zone 3B Division 31 28-Aug-2017 29-Aug-2017 11:00 AM 29-Aug-2017 E Rejected Closed
to MH-1a-L14 and MH-1a-L14 to MH-1-L13 and MH-2-L13 to MH-1-
L13 and MH-1-L13 to MH-1a-L13 and MH-1a-L13 to MH-14-L01
Inspection of Sand Filling Around pipe Sewer Maine Line Dia 200mm
Approved w/
1644.1 KHEP-CI-1644-01 Zone 3B, Line 14 & 13 , MH-2-L14 to MH-1-L14 and MH-1-L14 Line 14 & 13 Zone 3B Division 31 5-Sep-2017 6-Sep-2017 11:00 AM 7-Sep-2017 B comments
Closed
to MH-1a-L14 and MH-1a-L14 to MH-1-L13 and MH-2-L13 to MH-1-
L13 and MH-1-L13 to MH-1a-L13 and MH-1a-L13 to MH-14-L01
Compaction test 1st and final layer Structural fill (Selected fill)
1645 KHEP-CI-1645
Zone 4A, Cluster 67,A4
Cluster 67,A4 Zone 4A Division 31 28-Aug-2017 29-Aug-2017 10:30 AM 30-Aug-2017 A Approved Closed
Cast in place concrete Form work inspection for RC Footing
Cluster 36,
1646 KHEP-CI-1646
BC4
NA Division 03 28-Aug-2017 29-Aug-2017 9:30 AM 30-Aug-2017 A Approved Closed
Cluster 36, BC4
Installation of reinforcing steel bar, Embedded item and form closure
Cluster 36,
1647 KHEP-CI-1647 inspection for RC Footing
BC4
NA Division 03 28-Aug-2017 29-Aug-2017 9:30 AM 30-Aug-2017 A Approved Closed
Cluster 36, BC4
Cast in place concrete Form work inspection for RC Footing
Cluster 55,
1648 KHEP-CI-1648 Cluster
BC4
NA Division 03 28-Aug-2017 29-Aug-2017 10:00 AM 30-Aug-2017 A Approved Closed
55, BC4
Installation of reinforcing steel bar, Embedded item and form closure
Cluster 55,
1649 KHEP-CI-1649 inspection for RC Footing
BC4
NA Division 03 28-Aug-2017 29-Aug-2017 10:00 AM 30-Aug-2017 A Approved Closed
Cluster 55, BC4
Concrete sampling , testing and placement inspection for RC Grade
Cluster 81, Approved w/
1650 KHEP-CI-1650 Beam
A6
NA Division 03 28-Aug-2017 29-Aug-2017 9:00 AM 30-Aug-2017 B comments
Closed
Cluster 81, A6
Cast in place concrete Form work inspection for RC Stair Ground
Floor (First Flight)
1651 KHEP-CI-1651
Cluster 17, B2
Cluster 17 B2 NA Division 03 28-Aug-2017 29-Aug-2017 10:00 AM 30-Aug-2017 A Approved Closed
Check the survey work, elevation and coordinate for billnding footing
Cluster 42,
1696 KHEP-CI-1696
Cluster 42, BC4 BC4
NA Division 03 7-Sep-2017 9-Sep-2017 10:00 AM 10-Sep-2017 A Approved Closed
Check the survey work, elevation and coordinate for billnding footing
Cluster 41,
1697 KHEP-CI-1697
Cluster 41, BC4 BC4
NA Division 03 7-Sep-2017 9-Sep-2017 10:00 AM 10-Sep-2017 A Approved Closed
Check the survey work, elevation and coordinate for billnding footing
Cluster 74,
1698 KHEP-CI-1698
Cluster 74, BC4 BC4
NA Division 03 7-Sep-2017 9-Sep-2017 10:00 AM 10-Sep-2017 A Approved Closed
Check the survey work, elevation and coordinate for blinding under
grade beam
1699 KHEP-CI-1699
Cluster 20, B2
Cluster 20 B2 NA Division 03 7-Sep-2017 9-Sep-2017 10:00 AM 10-Sep-2017 E Rejected Closed
Check the survey work, elevation and coordinate for blinding under
grade beam
1699.1 KHEP-CI-1699-01
Cluster 20, B2
Cluster 20 B2 NA Division 03 11-Sep-2017 12-Sep-2017 10:00 AM 12-Sep-2017 A Approved Closed
Check the survey work, elevation and coordinate for bilnding under
grade beam Cluster 44,
1703 KHEP-CI-1703
Cluster 44, A6 A6
NA Division 03 7-Sep-2017 9-Sep-2017 10:00 AM 10-Sep-2017 E Rejected Closed
Check the survey work, elevation and coordinate for bilnding under
grade beam Cluster 44,
1703.1 KHEP-CI-1703-01
Cluster 44, A6 A6
NA Division 03 11-Sep-2017 12-Sep-2017 10:00 AM 12-Sep-2017 A Approved Closed
Compaction test of Sand Filling Above the pipe trench and laying
warning tape Storm Maine Line Dia 200mm Zone 3B,
Approved w/
1707 KHEP-CI-1707 Line 14 & 13, MH-2-L14 to MH-1-L14 and MH-1-L14 to MH-1a-L14 Line 14 & 13 Zone 3B Division 31 7-Sep-2017 9-Sep-2017 11:30 AM 10-Sep-2017 B comments
Closed
and MH-1a-L14 to MH-1-L13 and MH-2-L13 to MH-11-L13 and MH-
1-L13 to MH-1a-L13 and MH-1a-L13 to MH-14-L01
Inspection of Sand Filling Around pipe Storm Maine Line Dia 400mm
Approved w/
1708 KHEP-CI-1708
Zone 3B, Line 21, MH-77-L21 to MH-78-L21 and MH-78-L21
Line 21 Zone 3B Division 31 7-Sep-2017 9-Sep-2017 11:00 AM 10-Sep-2017 B comments
Closed
to MH-79-L21
Compaction test between cluster general fill (formation level)
Cluster 4 &
1709 KHEP-CI-1709
43
Zone 2A Division 31 7-Sep-2017 9-Sep-2017 11:00 AM 9-Sep-2017 E Rejected Closed
Zone 2A, Cluster 4 & 43
Concrete sampling , testing and placement inspection for RC Roof
1710 KHEP-CI-1710 Slab Cluster 01 A6 NA Division 03 9-Sep-2017 10-Sep-2017 9:00 AM 11-Sep-2017 A Approved Closed
Cluster 1, A6
Concrete sampling , testing and placement inspection for RC First
1711 KHEP-CI-1711 Floor Slab Cluster 10 B2 NA Division 03 9-Sep-2017 10-Sep-2017 9:00 AM 11-Sep-2017 A Approved Closed
Cluster 10, B2
Concrete sampling , testing and placement inspection for RC Column
1712 KHEP-CI-1712 (First Floor) Cluster 12 B2 NA Division 03 9-Sep-2017 10-Sep-2017 9:00 AM 11-Sep-2017 A Approved Closed
Cluster 12, B2
Concrete sampling , testing and placement inspection for RC Stair
1713 KHEP-CI-1713 First Flight Cluster 17 B2 NA Division 03 9-Sep-2017 10-Sep-2017 9:00 AM 11-Sep-2017 A Approved Closed
Cluster
Cast in place 17, B2
concrete Form work inspection for RC Footing
Cluster Cluster 26,
1714 KHEP-CI-1714
26, A6 A6
NA Division 03 9-Sep-2017 10-Sep-2017 3:00 PM 11-Sep-2017 A Approved Closed
Inspection of Sand Filling Around pipe Storm Maine Line Dia 400 &
500mm
1719 KHEP-CI-1719
Zone 3B, Line 22, MH-83-L22 to MH-84-L22 and MH-
Line 22 Zone 3B Division 31 9-Sep-2017 10-Sep-2017 11:00 AM 11-Sep-2017 A Approved Closed
84-L22 to MH-87-L22 and MH-87-L22 to MH-88-L22
Compaction test of Sand Filling Above the pipe trench and laying
1720 KHEP-CI-1720 warning tape Storm Maine Line Dia 400mm Zone 4B, Line 36 Zone 4B Division 31 9-Sep-2017 10-Sep-2017 11:00 AM 11-Sep-2017 A Approved Closed
Line 36, MH-133-L36 to MH-126-L26
Installation Inspection of Precast Storm Drainage Manholes
Line 10 & 11 Approved w/
1721 KHEP-CI-1721 Zone 1B, Line 10 &
& 13
Zone 1B Division 33 9-Sep-2017 10-Sep-2017 3:00 PM 11-Sep-2017 B comments
Closed
11 & 13, MH-I31-L10 and MH-I33-L11 and MH-I39-L13
Cast in place concrete Form work inspection for RC Column Neck
axis (B5,D5,F5,H5) Cluster 79,
1722 KHEP-CI-1722
Cluster 79, BC4 BC4
NA Division 03 9-Sep-2017 10-Sep-2017 10:00 AM 11-Sep-2017 A Approved Closed
Cast in place concrete Form work inspection for RC footing
Cluster 76,
1723 KHEP-CI-1723 Cluster
BC4
NA Division 03 10-Sep-2017 11-Sep-2017 10:00 AM 12-Sep-2017 A Approved Closed
76, BC4
Installation of reinforcing steel bar, embedded item and form closure
Cluster 76,
1724 KHEP-CI-1724 inspection for RC footing
BC4
NA Division 03 10-Sep-2017 11-Sep-2017 10:00 AM 12-Sep-2017 A Approved Closed
Cluster 76, BC4
Cast in place concrete Form work inspection for RC footing
Cluster 37,
1725 KHEP-CI-1725 Cluster
BC4
NA Division 03 10-Sep-2017 11-Sep-2017 10:00 AM 12-Sep-2017 A Approved Closed
37, BC4
Installation of rainforcing steel bar, embedded item and form closure
Cluster 37,
1726 KHEP-CI-1726 inspection for RC footing
BC4
NA Division 03 10-Sep-2017 11-Sep-2017 10:00 AM 12-Sep-2017 A Approved Closed
Cluster 76, BC4
Installation of rainforcing steel bar, embedded item and form closure
Cluster 66, Approved w/
1727 KHEP-CI-1727 inspection for RC Grade Beam
A6
NA Division 03 10-Sep-2017 11-Sep-2017 10:00 AM 12-Sep-2017 B comments
Closed
Cluster 66, BC4
Termite control surface preparation, installation and final inspection
Cluster 42,
1728 KHEP-CI-1728 for footing Cluster
BC4
NA Division 03 10-Sep-2017 11-Sep-2017 10:00 AM 12-Sep-2017 A Approved Closed
42, BC4
Termite control surface preparation, installation and final inspection
Cluster 41,
1729 KHEP-CI-1729 for footing Cluster
BC4
NA Division 03 10-Sep-2017 11-Sep-2017 10:00 AM 12-Sep-2017 A Approved Closed
41, BC4
Termite control surface preparation, installation and final inspection
Cluster 74,
1730 KHEP-CI-1730 for footing Cluster
BC4
NA Division 03 10-Sep-2017 11-Sep-2017 10:00 AM 11-Sep-2017 A Approved Closed
74, BC4
Compaction test of sand filling above the pipe trench and laying
warning tape - storm main line Dia 400 & 500mm Approved w/
1736 KHEP-CI-1736
Zone 2B, Line 03 & 01,MH-I7-L03 to MH-
Line 3 & 1 Zone 2B Division 31 10-Sep-2017 11-Sep-2017 11:00 AM 12-Sep-2017 B comments
Closed
I8-L01, MH-I8-L01 to MH-9-L01
Concrete sampling, testing and placement inspection for RC column
Approved w/
1737 KHEP-CI-1737 (Ground Floor) Cluster 3, A6 NA Division 03 11-Sep-2017 12-Sep-2017 9:00 AM 13-Sep-2017 B comments
Closed
Cluster 3, A6
Concrete sampling, testing and placement inspection for RC first floor
Approved w/
1738 KHEP-CI-1738 slab Cluster 68, Cluster 68, B2 NA Division 03 11-Sep-2017 12-Sep-2017 9:00 AM 13-Sep-2017 B comments
Closed
B2
First coat Damp Proofing Installation Inspection for CMU, morter and
1739 KHEP-CI-1739
masonry inspection under exterior reinforced G.B Cluster 54, B2
Cluster 54, B2 NA Division 07 11-Sep-2017 12-Sep-2017 11:00 AM 14-Sep-2017 A Approved Closed
Compaction test of sand bedding under pipe trench, sewer main line
Dia 200mm Zone 4B Approved w/
1742 KHEP-CI-1742
Line 17 ,MH-2-L17 to MH-2-A-L17, MH-2-A-L17 to MH-1-L17
Line 17 Zone 4B Division 31 11-Sep-2017 12-Sep-2017 11:30 AM 13-Sep-2017 B comments
Closed
Compact test around footing general fill (Final layer) Zone
1743 KHEP-CI-1743
3B, Cluster 58, B2
Cluster 58, B2 Zone 3B Division 31 11-Sep-2017 12-Sep-2017 10:30 AM 13-Sep-2017 E Rejected Closed
Cast in place concrete form work inspection for RC Footing Cluster Cluster 56,
1746 KHEP-CI-1746
56, BC4 BC4
NA Division 03 12-Sep-2017 13-Sep-2017 10:00 AM 14-Sep-2017 A Approved Closed
Termite control surface preparation, installation and final inspection Cluster 44,
1754 KHEP-CI-1754
for blinding concrete under grade beam Cluster 44, A6 A6
NA Division 03 12-Sep-2017 13-Sep-2017 3:00 PM 14-Sep-2017 A Approved Closed
Concrete sampling, testing and placement for RC grade beam Cluster 66, Approved w/
1768 KHEP-CI-1768
Cluster 66, A6 A6
NA Division 03 13-Sep-2017 14-Sep-2017 9:00 AM 14-Sep-2017 B comments
Closed
Installation of rein forcing steel bar, embedded item and form closure Cluster 26,
1769 KHEP-CI-1769
inspection for RC Column Neck Cluster 26, BC4 BC4
NA Division 03 13-Sep-2017 14-Sep-2017 3:00 PM 16-Sep-2017 A Approved Closed
Installation of rein forcing steel bar, embedded item and form closure Cluster 36,
1770 KHEP-CI-1770
inspection for RC Column Neck Cluster 36, BC4 BC4
NA Division 03 13-Sep-2017 14-Sep-2017 10:00 AM 14-Sep-2017 A Approved Closed
Compaction test of sand bedding under pipe trench, storm main line
Approved w/
1774 KHEP-CI-1774 Dia 400mm Zone 4B, Line 33 Zone 4B Division 33 13-Sep-2017 14-Sep-2017 11:30 AM 16-Sep-2017 B comments
Closed
Line 33, MH-I121-L33 to MH-I122-L33, MH-I122-L33 to MH-I123-L33
Compaction test of sand bedding under pipe trench, storm main line
Dia 400 & 700mm Approved w/
1775 KHEP-CI-1775
Zone 5A, Line 37 & 18, MH-134-L37 to MH-75-L18, MH-75-L18 to
Line 37 & 18 Zone 5A Division 31 13-Sep-2017 14-Sep-2017 10:00 AM 16-Sep-2017 B comments
Closed
MH-74-L18
Back filling general fill final layar for pipe trench, Storm main line Dia
Approved w/
1776 KHEP-CI-1776 800mm Zone 4B, Line 26 Zone 4B Division 31 13-Sep-2017 14-Sep-2017 10:00 AM 14-Sep-2017 B comments
Closed
Line 26, MH-125-L26 to MH-126-L26
First coat, Bituminous damp proofing installation inspection for storm
manholes, precast yard Zone 1B & Line 21 & 11
1777 KHEP-CI-1777
2B, Line 21 & 11 & 13, MH-I80-L21 and MH-I81-L21,MH-I34-L11, & 13
Zone 1B & 2B Division 33 13-Sep-2017 14-Sep-2017 3:00 PM 16-Sep-2017 A Approved Closed
MH-I41-L13 (Square)
Installation of rein forcing steel bar, embedded item and form closure Cluster 55,
1778 KHEP-CI-1778
inspection for RC Column Neck Cluster 55, BC4 BC4
NA Division 03 13-Sep-2017 14-Sep-2017 10:00 AM 14-Sep-2017 A Approved Closed
Back filling general fill final layer for pipe trench, storm main line Dia
400mm Zone 2B, Approved w/
1780 KHEP-CI-1780
Line 4 & 5, MH-I10-L04 to MH-I12-L04, MH-I12-L04 to MH-I13-L04,
Line 4 & 5 Zone 2B Division 31 14-Sep-2017 16-Sep-2017 10:00 AM 16-Sep-2017 B comments
Closed
MH-I11-L05 to MH-I12-L04
Back filling general fill final layer for pipe trench, storm main line Dia
200mm Zone 3B,
Approved w/
1781 KHEP-CI-1781 Line 23 & 24, MH-2-L23 to MH-1-L23 and MH-1-L23 to MH-1-A-L23, Line 23 & 24 Zone 3B Division 31 14-Sep-2017 16-Sep-2017 10:00 AM 16-Sep-2017 B comments
Closed
MH-1-A-L23 to MH-17-L02, MH-1-L24 to MH-1-A-L24 and MH-1-A-
L24 to MH-1-L23
Back filling general fill final layer for pipe trench, storm main line Dia
200mm Zone 4B, Approved w/
1782 KHEP-CI-1782
Line 2, MH-22-L02 to MH-21-L02 and MH-21-L02 to MH-20-L02, MH-
Line 02 Zone 4B Division 31 14-Sep-2017 16-Sep-2017 10:00 AM 16-Sep-2017 B comments
Closed
20-L02 to MH-19-L02, MH-19-L02 to MH-18-L02
Back filling general fill final layer for pipe trench, storm main line Dia
800mm Zone 4B, Approved w/
1783 KHEP-CI-1783
Line 27, MH-114-L27 to MH-111a-L27 and MH-111a-L27 to MH-111-
Line 27 Zone 4B Division 31 14-Sep-2017 16-Sep-2017 10:00 AM 16-Sep-2017 B comments
Closed
L27, MH-111-L27 to MH-110A-L27, MH-110A-L27 to MH-108-L27
Inspection formwork for base & wall and concrete pouring for storm
1784 KHEP-CI-1784 manholes precast yard Zone 2B, Line 09 Line 09 & 02 Zone 2B Division 33 14-Sep-2017 16-Sep-2017 3:00PM 17-Sep-2017 E Rejected Closed
& 02, MH-I24-L09, MH-I25-L09, MH-I4-L02 & MH-I5-L02
Inspection formwork for base & wall and concrete pouring for storm
1784.1 KHEP-CI-1784-01 manholes precast yard Zone 2B, Line 09 Line 09 & 02 Zone 2B Division 33 19-Sep-2017 20-Sep-2017 10:00 AM 20-Sep-2017 A Approved Closed
& 02, MH-I24-L09, MH-I25-L09, MH-I4-L02 & MH-I5-L02
Check the survey work, elevation and coordinate for blinding under
1795 KHEP-CI-1795 grade beam Cluster 48, Cluster 48, B2 NA Division 03 14-Sep-2017 16-Sep-2017 10:00 AM 17-Sep-2017 A Approved Closed
B2
Check the survey work, elevation and coordinate for blinding under
1796 KHEP-CI-1796 grade beam Cluster 58, Cluster 58, B2 NA Division 03 14-Sep-2017 16-Sep-2017 10:00 AM 17-Sep-2017 A Approved Closed
B2
Inspection formwork for base & wall and concrete pouring for storm
manholes precast yard Zone 1A &1B, Line 12, 11 &
1798 KHEP-CI-1798
Line 12, 11 & 17, MH-55-L17, MH-35-L12 and MH-36-L12, MH-37- 17
Zone 1A &1B Division 33 14-Sep-2017 16-Sep-2017 3:00PM 17-Sep-2017 E Rejected Closed
L11 and MH-38-L11
Inspection formwork for base & wall and concrete pouring for storm
manholes precast yard Zone 1A &1B, Line 12, 11 &
1798.1 KHEP-CI-1798-01
Line 12, 11 & 17, MH-55-L17, MH-35-L12 and MH-36-L12, MH-37- 17
Zone 1A &1B Division 33 19-Sep-2017 20-Sep-2017 10:00 AM 20-Sep-2017 A Approved Closed
L11 and MH-38-L11
Inspection of excavated and compaction formation for pipe trench,
Approved w/
1799 KHEP-CI-1799 storm main line Dia 800mm Zone 4B, Line 26 Zone 4B Division 31 14-Sep-2017 16-Sep-2017 11:00 AM 17-Sep-2017 B comments
Closed
Line 26, MH-120-L26 to MH-125-L26
Inspection of excavated and compaction formation for pipe trench,
storm main line Dia 500 & 600mm Zone 3B,
1800 KHEP-CI-1800
Line 27, MH-100-L27 to MH-101-L27, MH-101-L27 to MH -105-L27,
Line 27 Zone 3B Division 31 14-Sep-2017 16-Sep-2017 11:00 AM 17-Sep-2017 A Approved Closed
MH-105-L27 to MH-108-L27
Inspection of excavated and compaction formation for pipe trench,
storm main line Dia 500mm Zone 3B, Line Approved w/
1801 KHEP-CI-1801
21, MH-79-L21 to MH-I80-L21, MH-I80-L21 to MH -I81-L21, MH-I81-
Line 21 Zone 3B Division 31 14-Sep-2017 16-Sep-2017 11:00 AM 17-Sep-2017 B comments
Closed
L21 to MH-82-L21
70cm, CMU morter and masonry inspection under exterior reinforced
Cluster 21,
1802 KHEP-CI-1802 grade beam
BC4
NA Division 04 14-Sep-2017 16-Sep-2017 3:00 PM 19-Sep-2017 A Approved Closed
Cluster 21, BC4
Installation of reinforcing steel bar, embedded item and form closure Approved w/
1803 KHEP-CI-1803
inspection for RC column ground floor Cluster 66, A6
Cluster 66 NA Division 03 14-Sep-2017 16-Sep-2017 3:00 PM 17-Sep-2017 B comments
Closed
Compact test around footing general fill (Final layer) Zone Cluster 43,
1807 KHEP-CI-1807
2A, Cluster 43, A6 A6
Zone 2A Division 33 14-Sep-2017 16-Sep-2017 10:30 AM 17-Sep-2017 A Approved Closed
Inspection for sand filling around pipe, sewer maine line Dia 400mm
Approved w/
1823 KHEP-CI-1823 Zone 4B, Line 33 Zone 4B Division 33 17-Sep-2017 18-Sep-2017 1:30 PM 19-Sep-2017 B comments
Closed
Line 33 MH-I121-L33 to MH-I122-L33, MH-I122-L33 to MH-I123-L33
Inspection for sand filling around pipe, storm main line Dia 500mm
1824 KHEP-CI-1824 Zone 2B, Line 20 Zone 2B Division 31 17-Sep-2017 18-Sep-2017 1:30 PM 19-Sep-2017 A Approved Closed
Line 20 MH-67-L20 to MH-68-L20
Inspection of excavated and compaction formation for pipe trench,
storm main line Dia 400mm
1825 KHEP-CI-1825
Zone 3B, Line 28 & 29, MH-I103-L29 to MH-I104-L28, MH-I104-L28
Line 28 & 29 Zone 3B Division 31 17-Sep-2017 18-Sep-2017 2:00 PM 19-Sep-2017 A Approved Closed
to MH-I105-L27, MH-I102-L28 to MH-I104-L28
Installation of reinforcing steel bar, embedded item and form closure
Cluster 37,
1826 KHEP-CI-1826 inspection for RC column neck
BC4
NA Division 03 17-Sep-2017 18-Sep-2017 10:30 AM 19-Sep-2017 A Approved Closed
Cluster 37, BC4
Installation of reinforcing steel bar, embedded item and form closure
1827 KHEP-CI-1827 inspection for RC column ground floor Cluster 4, A6 NA Division 03 17-Sep-2017 18-Sep-2017 11:00 AM 19-Sep-2017 A Approved Closed
Cluster 4, A6
70cm, CMU moter and masonary inspection under exterior reinforced Cluster 63,
1828 KHEP-CI-1828
grade beam Cluster 63, B2 B2
NA Division 04 17-Sep-2017 18-Sep-2017 10:00 AM 19-Sep-2017 A Approved Closed
70cm, CMU motor and masonry inspection under exterior reinforced Cluster 33,
1833 KHEP-CI-1833
grade beam Cluster 33, B2 B2
NA Division 04 18-Sep-2017 19-Sep-2017 3:00 PM 20-Sep-2017 A Approved Closed
Inspection of sand filling around pipe, Sewer main line Dia 200mm
Approved w/
1838 KHEP-CI-1838 Zone 4B, Line 17 Zone 4B Division 31 18-Sep-2017 19-Sep-2017 11:00 AM 20-Sep-2017 B comments
Closed
Line 17, MH-2-L17 to MH-2-A-L17, MH-2-A-L17 to MH-1-L17
Compaction test of Sand Filling Above the pipe trench, Swear Maine
Line Dia 400mm Zone Approved w/
1839 KHEP-CI-1839
3B, Line 28 & 29, MH-I103-L29 to MH-I104-L28, MH-I104-L28 to
Line 28 & 29 Zone 3B Division 31 18-Sep-2017 19-Sep-2017 2:00 PM 20-Sep-2017 B comments
Closed
MH-I105-L27, MH-I102-L28 to MH-I104-L28
70cm, CMU motor and masonry inspection under exterior reinforced Cluster 34,
1840 KHEP-CI-1840
grade beam Cluster 34, B2 B2
NA Division 04 19-Sep-2017 20-Sep-2017 1:30 PM 21-Sep-2017 A Approved Closed
Inspection form work for base & wall storm manholes, precast yard
Zone 2B & 4B, Line 3,4,5 &
1843 KHEP-CI-1843
Line 3,4,5 & 33, MH-I7-L03, MH-I12-L04, MH-I11-L05 & MH-I122- 33
Zone 2B & 4B Division 33 19-Sep-2017 20-Sep-2017 3:00 PM 21-Sep-2017 A Approved Closed
L33
Inspection of dam proofing surface preparation for strom manholes,
(Precast yard) Zone 2B & 4B,
1844 KHEP-CI-1844
Line 7 & 22, MH-19-L07 and MH-20-L07, MH-83-L22 & MH-84-L22,
Line 7 & 22 Zone 2B & 4B Division 31 19-Sep-2017 20-Sep-2017 2:00 PM 21-Sep-2017 A Approved Closed
MH-87-L22
Inspection of Reinforcement steel bar and internal Shutter for storm
manholes (Precast yard) Line 4, 27, 32 Zone 2B,3B &
1845 KHEP-CI-1845
Zone 2B,3B & 4B, Line 4, 27, 32 & 33, MH-I10-L04, MH--I98-L27, & 33 4B
Division 33 19-Sep-2017 20-Sep-2017 3:00 PM 21-Sep-2017 A Approved Closed
MH-I113-L32 and MH-I121-L33
First coat, Bituminous damp proofing installation inspection for storm
manholes, precast yard Zone 1B & Line 13, 14,
1846 KHEP-CI-1846
4B, Line 13, 14, 15 & 22, MH-45-L13, MH-44-L14 and MH-49- 15 & 22
Zone 1B & 4B Division 33 19-Sep-2017 20-Sep-2017 3:00 PM 21-Sep-2017 A Approved Closed
L15,MH-88-L22 and MH-89-L22
Cast in place concrete formwork inspection for RC roof slab Cluster
1847 KHEP-CI-1847
2, A6
Cluster 02 A6 NA Division 03 19-Sep-2017 20-Sep-2017 11:00 AM 24-Sep-2017 E Rejected Closed
First coat dam proofing installation inspection for CMU, morter and
1850 KHEP-CI-1850 masonary inspection under exterior reinforced grade beam Cluster 35, B2 NA Division 07 19-Sep-2017 20-Sep-2017 1:30 PM 21-Sep-2017 A Approved Closed
Cluster 35, B2
Cast in place concrete form work inspection for RC first floor slab &
Approved w/
1851 KHEP-CI-1851 stair Cluster 17 B2 NA Division 03 19-Sep-2017 20-Sep-2017 10:30 AM 24-Sep-2017 B comments
Closed
Cluster 17, B2
Cast in place concrete form work inspection for RC Column first floor
1852 KHEP-CI-1852 Cluster 68, B2 NA Division 03 20-Sep-2017 21-Sep-2017 10:00 AM 24-Sep-2017 A Approved Closed
Cluster 68, B2
Cast in place concrete form work inspection for RC Roof Slab
1853 KHEP-CI-1853
Cluster 15, B2
Cluster 15 B2 NA Division 03 20-Sep-2017 21-Sep-2017 10:00 AM 24-Sep-2017 E Rejected Closed
Cast in place concrete form work inspection for RC Footing Cluster 77,
1856.1 KHEP-CI-1856-01
Cluster 77, BC4 BC4
NA Division 03 26-Sep-2017 27-Sep-2017 10:00 AM 28-Sep-2017 A Approved Closed
Second coat dam proofing installation inspection for CMU, Morter and
Cluster 45,
1861 KHEP-CI-1861 Masonry inspection under exterior reinforced grade beam
A6
NA Division 07 20-Sep-2017 21-Sep-2017 10:00 AM 24-Sep-2017 A Approved Closed
Cluster 45, A6
70cm, CMU motor and masonry inspection under exterior reinforced Cluster 65,
1862 KHEP-CI-1862
grade beam Cluster 65, A6 A6
NA Division 04 20-Sep-2017 21-Sep-2017 2:00 PM 24-Sep-2017 A Approved Closed
Inspection of sand filling around pipe, Sewer main line Dia 500mm
Zone 3B, Approved w/
1863 KHEP-CI-1863
Line 21, MH-79-L21 to MH-I80-L21 and MH-I80-L21 to MH-I81-L21
Line 21 Zone 3B Division 31 20-Sep-2017 21-Sep-2017 11:00 AM 24-Sep-2017 B comments
Closed
and MH-I81-L21 to MH-I82-L21
Inspection of concrete pouring and sampling for base & wall for
strom manholes, (Precast yard) Line 3 & 4 &
1864 KHEP-CI-1864
Zone 2B & 4B, Line 3 & 4 & 5 & 33, MH-I7-L03 and MH-I12-L04, 5 & 33
Zone 2B & 4B Division 33 21-Sep-2017 23-Sep-2017 3:00 PM 24-Sep-2017 A Approved Closed
MH-I11-L05 & MH-I122-L33
Compact test around footing general fill (Final layer) Zone Cluster 9,
1865 KHEP-CI-1865
1B, Cluster 9, BC4 BC4
Zone 1B Division 31 21-Sep-2017 23-Sep-2017 10:30 AM 24-Sep-2017 A Approved Closed
Back filling general fill final layer for pipe trench, storm main line Dia
Approved w/
1869 KHEP-CI-1869 400mm Zone 2B, Line 2 Zone 2B Division 31 21-Sep-2017 23-Sep-2017 10:00 AM 24-Sep-2017 B comments
Closed
Line 2, MH-I4-L02 to MH-I5-L02 and MH-I5-L02 to MH-6-L01
Back filling general fill final layer for pipe trench, Sewer main line Dia
Approved w/
1870 KHEP-CI-1870 200mm Zone 3B, Line 1 Zone 3B Division 31 21-Sep-2017 23-Sep-2017 10:00 AM 24-Sep-2017 B comments
Closed
Line 1, MH-16-L01 to MH-15-L01
Termite control surface preparation, installation and final inspection
1871 KHEP-CI-1871 for Grade Beam Cluster 48, B2 NA Division 03 21-Sep-2017 23-Sep-2017 10:00 AM 24-Sep-2017 A Approved Closed
Cluster 48, B2
Termite control surface preparation, installation and final inspection
1872 KHEP-CI-1872 for Grade Beam Cluster 58, B2 NA Division 03 21-Sep-2017 23-Sep-2017 10:00 AM 24-Sep-2017 A Approved Closed
Cluster 58, B2
Check the survey work, elevation and coordinate for blinding under
1873 KHEP-CI-1873 grade beam Cluster 54, Cluster 54, B2 NA Division 03 21-Sep-2017 23-Sep-2017 10:00 AM 24-Sep-2017 E Rejected Closed
B2
Check the survey work, elevation and coordinate for blinding under
1873.1 KHEP-CI-1873-01 grade beam Cluster 54, Cluster 54, B2 NA Division 03 26-Sep-2017 27-Sep-2017 10:00 AM 28-Sep-2017 A Approved Closed
B2
Concrete sampling, testing and placement inspection for RC Stair
1874 KHEP-CI-1874 (First Flight) Cluster 5, A6 NA Division 03 21-Sep-2017 23-Sep-2017 9:00 AM 24-Sep-2017 A Approved Closed
Cluster 5, A6
Concrete sampling, testing and placement inspection for RC Footing
Cluster 56,
1875 KHEP-CI-1875 Cluster 56,
BC4
NA Division 03 21-Sep-2017 23-Sep-2017 9:00 AM 24-Sep-2017 A Approved Closed
BC4
Concrete sampling, testing and placement inspection for RC Column
Cluster 36,
1876 KHEP-CI-1876 Neck
BC4
NA Division 03 21-Sep-2017 23-Sep-2017 9:00 AM 24-Sep-2017 A Approved Closed
Cluster 36, BC4
Cast in place concrete form work inspection for RC First Floor Slab &
1878 KHEP-CI-1878 Stair Cluster 5, B2 NA Division 03 21-Sep-2017 23-Sep-2017 2:30 PM 25-Sep-2017 E Rejected Closed
Cluster 5, B2
Cast in place concrete form work inspection for RC First Floor Slab &
1878.1 KHEP-CI-1878-01 Stair Cluster 5, B2 NA Division 03 28-Sep-2017 30-Sep-2017 10:30 AM 5-Oct-2017 A Approved Closed
Cluster 5, B2
Concrete sampling, testing and placement inspection for RC Grade
1879 KHEP-CI-1879 Beam Cluster 75, B2 NA Division 03 21-Sep-2017 23-Sep-2017 9:00 AM 24-Sep-2017 A Approved Closed
Cluster 75, B2
Cast in place concrete form work inspection for RC Column (First
1880 KHEP-CI-1880 Floor) Cluster 10 B2 NA Division 03 21-Sep-2017 23-Sep-2017 2:30 PM 24-Sep-2017 A Approved Closed
Cluster 10, B2
First coat, Bituminous damp proofing installation inspection for storm
manholes, precast yard Zone 2B &
1881 KHEP-CI-1881
4B, Line 7 & 22, MH-19-L07 and MH-20-L07,MH-83-L22, MH-84-L22
Line 7 & 22 Zone 2B & 4B Division 31 21-Sep-2017 23-Sep-2017 2:00 PM 24-Sep-2017 A Approved Closed
and MH-87-L22
Inspection of dam proofing surface preparation for strom manholes,
(Precast yard) Zone 1B & 2B, Line 9 & 13 & Approved w/
1882 KHEP-CI-1882
Line 9 & 13 & 16, MH-I22-L09 and MH-I23-L09, MH-I42-L13 & MH- 16
Zone 1B & 2B Division 33 21-Sep-2017 23-Sep-2017 3:00 PM 24-Sep-2017 B comments
Closed
I53-L16
Inspection of excavated compaction formation for pipe trench, storm
Approved w/
1883 KHEP-CI-1883 main line Dia 400mm Zone 2B, Line 1, Line 1 Zone 2B Division 31 21-Sep-2017 23-Sep-2017 11:00 AM 25-Sep-2017 B comments
Closed
MH-6-L01 to MH-I8-L01
Compaction test of sand bedding under pipe trench - Storm Maine
Line Dia 400mm Zone 2B,
1884 KHEP-CI-1884
Line 9, MH-I22-L09 to MH-I23-L09, MH-I23-L09 to MH-I24-L09, MH-
Line 9 Zone 2B Division 31 21-Sep-2017 23-Sep-2017 2:00 PM 24-Sep-2017 A Approved Closed
I24-L09 to MH-I25-L09
Inspection of sand filling around pipe, Storm main line Dia 500 &
600mm Approved w/
1885 KHEP-CI-1885
Zone 3B, Line 27, MH-100-L27 to MH-101-L27 and MH-101-L27 to
Line 27 Zone 3B Division 31 21-Sep-2017 23-Sep-2017 2:00 PM 24-Sep-2017 B comments
Closed
MH-105-L27 and MH-105-L27 to MH-108-L27
Compaction test of Sand Filling Above the pipe trench and laying
warning tape Swear Maine Line Dia 200mm Approved w/
1886 KHEP-CI-1886
Zone 4B, Line 17, MH-2-L17 to MH-2a-L17, MH-
Line 17 Zone 4B Division 31 21-Sep-2017 23-Sep-2017 11:30 AM 24-Sep-2017 B comments
Closed
2a-L17 to MH-1-L17
Compaction test of Sand Filling Above the pipe trench and laying
1887 KHEP-CI-1887 warning tape Storm Maine Line Dia 500mm Line 20 Zone 3B Division 31 21-Sep-2017 23-Sep-2017 11:30 AM 24-Sep-2017 A Approved Closed
Zone 3B, Line 20, MH-67-L20 to MH-68-L20
Installation Inspection of Precast Storm Drainage manholes
1888 KHEP-CI-1888 Zone 1B, Line 11 & Line 11 & 13 Zone 1B Division 33 21-Sep-2017 23-Sep-2017 11:00 AM 25-Sep-2017 A Approved Closed
13, MH-I34-L11 and MH-I40-L13 and MH-I41-L13
Cast in place concrete form work inspection for RC Grade Beam
1889 KHEP-CI-1889 Cluster 61, Cluster 61, B2 NA Division 03 21-Sep-2017 23-Sep-2017 10:00 AM 25-Sep-2017 A Approved Closed
B2
First Coat, Damp Proofing Installation Inspection for RC footing &
Cluster 24,
1890 KHEP-CI-1890 Column Neck
BC4
NA Division 03 21-Sep-2017 23-Sep-2017 1:30 PM 24-Sep-2017 A Approved Closed
Cluster 24, BC4
First coat, Damp proofing installation inspection for RC Footing & Cluster 24,
1909 KHEP-CI-1909
Column Neck Cluster 24, BC4 BC4
NA Division 07 24-Sep-2017 25-Sep-2017 10:00 AM 26-Sep-2017 A Approved Closed
Check the survey work, elevation and coordinate for blinding Footing Cluster 40,
1921 KHEP-CI-1921
Cluster 40, BC4 BC4
NA Division 03 24-Sep-2017 25-Sep-2017 10:00 AM 25-Sep-2017 A Approved Closed
Second coat dam proofing installation inspection for CMU, Morter and
1935 KHEP-CI-1935 Masonry inspection under exterior reinforced grade beam Cluster 72, B2 NA Division 07 26-Sep-2017 27-Sep-2017 10:30 AM 28-Sep-2017 A Approved Closed
Cluster 72, B2
Second coat dam proofing installation inspection for CMU, Morter and
1936 KHEP-CI-1936 Masonry inspection under exterior reinforced grade beam Cluster 63, B2 NA Division 07 26-Sep-2017 27-Sep-2017 10:00 AM 28-Sep-2017 A Approved Closed
Cluster 63, B2
Second coat dam proofing installation inspection for CMU, Morter and
1937 KHEP-CI-1937 Masonry inspection under exterior reinforced grade beam Cluster 27, B2 NA Division 07 26-Sep-2017 27-Sep-2017 10:30 AM 28-Sep-2017 A Approved Closed
Cluster 27, B2
70cm, CMU motor and masonry inspection under exterior reinforced Cluster 46,
1958 KHEP-CI-1958
grade beam Cluster 46, A6 A6
NA Division 04 27-Sep-2017 28-Sep-2017 3:00 PM 28-Sep-2017 E Rejected Closed
70cm, CMU motor and masonry inspection under exterior reinforced Cluster 46,
1958.1 KHEP-CI-1958-01
grade beam Cluster 46, A6 A6
NA Division 04 30-Sep-2017 1-Oct-2017 2:00 PM 1-Oct-2017 A Approved Closed
Survey data for whole site Inspection cut and fill All Approved w/
1959 KHEP-CI-1959
Zone
NA All Zone Division 31 28-Sep-2017 30-Sep-2017 10:30 AM 23-Oct-2017 B comments
Closed
Compaction test of Sand Filling Above the pipe trench and laying
warning tape Storm Maine Line Dia 400mm
1960 KHEP-CI-1960
Zone 3B, Line 29 & 28, MH-I103-L29 to MH-I104-
Line 29 & 28 Zone 3B Division 31 28-Sep-2017 30-Sep-2017 10:30 AM 1-Oct-2017 A Approved Closed
L28 and MH-I104-L28 to MH-105-L27
Compaction test of Sand Filling Above the pipe trench Storm Maine
1961 KHEP-CI-1961 Line Dia 400mm Zone Line 29 & 28 Zone 3B Division 31 28-Sep-2017 30-Sep-2017 10:30 AM 1-Oct-2017 A Approved Closed
3B, Line 29 & 28, MH-I102-L28 to MH-I104-L28
Inspection damp proofing Surface Preparation for storm manholes,
precast yard Zone 1A & 1B, Line 12 & 11
1962 KHEP-CI-1962
Line 12 & 11 & 17, MH-88-L17 and MH-35-L12 and MH-36-L12 and & 17
Zone 1A & 1B Division 33 28-Sep-2017 30-Sep-2017 10:00 AM 1-Oct-2017 A Approved Closed
MH-37-L11 and MH-38-L11
Termite control surface preparation, installation and final inspection
Cluster 40,
1963 KHEP-CI-1963 for Footing Cluster
BC4
NA Division 03 28-Sep-2017 30-Sep-2017 2:00 PM 1-Oct-2017 E Rejected Closed
40, BC4
Termite control surface preparation, installation and final inspection
Cluster 40,
1963.1 KHEP-CI-1963-01 for Footing Cluster
BC4
NA Division 03 3-Oct-2017 4-Oct-2017 2:00 PM 4-Oct-2017 A Approved Closed
40, BC4
Termite control surface preparation, installation and final inspection
1964 KHEP-CI-1964 for Blinding under grade beam Cluster 54, B2 NA Division 03 28-Sep-2017 30-Sep-2017 2:00 PM 1-Oct-2017 E Rejected Closed
Cluster 54, B2
Termite control surface preparation, installation and final inspection
1964.1 KHEP-CI-1964-01 for Blinding under grade beam Cluster 54, B2 NA Division 03 3-Oct-2017 4-Oct-2017 2:00 PM 4-Oct-2017 A Approved Closed
Cluster 54, B2
Termite control surface preparation, installation and final inspection
Cluster 9,
1965 KHEP-CI-1965 for Blinding under grade beam
BC4
NA Division 03 28-Sep-2017 30-Sep-2017 2:00 PM 1-Oct-2017 E Rejected Closed
Cluster 9, BC4
Installation of reinforcing steel bar, embedded item and form closure
1966 KHEP-CI-1966 inspection for RC Grade Beam Cluster 61, B2 NA Division 03 28-Sep-2017 30-Sep-2017 10:00 AM 1-Oct-2017 A Approved Closed
Cluster 61, B2
Installation of reinforcing steel bar, embedded item and form closure
1967 KHEP-CI-1967 inspection for RC First Floor Slab & Stair Cluster 5, B2 NA Division 03 28-Sep-2017 30-Sep-2017 11:00 AM 1-Oct-2017 A Approved Closed
Cluster 5, B2
Cast in place concrete form work inspection for RC Column (Ground
1968 KHEP-CI-1968 Floor) Cluster 8, B2 NA Division 03 28-Sep-2017 30-Sep-2017 3:00 PM 2-Oct-2017 A Approved Closed
Cluster 8, B2
Building concrete sampling, testing and placement inspection for
Cluster 67,
1969 KHEP-CI-1969 Footing Cluster 67,
A4
NA Division 03 28-Sep-2017 30-Sep-2017 9:00 AM 1-Oct-2017 A Approved Closed
A4
Inspection form work for base & wall and concrete pouring for storm
manholes precast yard Zone 2B &3B & Line 1 & 27 & Zone 2B &3B &
1970 KHEP-CI-1970
4B, Line 1 & 27 & 23 & 31, MH-I97-L27, MH-I8-L01 and MH-I109- 23 & 31 4B
Division 33 28-Sep-2017 30-Sep-2017 11:30 AM 1-Oct-2017 A Approved Closed
L31 and MH-I85-L23
Second coat dam proofing installation inspection for CMU, Morter and
1973 KHEP-CI-1973 Masonry inspection under exterior reinforced grade beam Cluster 33, B2 NA Division 07 30-Sep-2017 1-Oct-2017 10:30 AM 1-Oct-2017 A Approved Closed
Cluster 33, B2
Second coat dam proofing installation inspection for CMU, Morter and
1974 KHEP-CI-1974 Masonry inspection under exterior reinforced grade beam Cluster 34, B2 NA Division 07 30-Sep-2017 1-Oct-2017 10:30 AM 1-Oct-2017 A Approved Closed
Cluster 34, B2
Dam Proofing surface preparation for RC Foundation & Column neck Cluster 18
1976 KHEP-CI-1976
Cluster 18, BC4 BC4
NA Division 07 30-Sep-2017 1-Oct-2017 10:00 AM 1-Oct-2017 A Approved Closed
Compaction test of Sand Filling Above the pipe trench and laying
1992 KHEP-CI-1992 warning tape Storm Maine Line Dia 400mm Line 37 Zone 3B Division 31 1-Oct-2017 2-Oct-2017 10:30 AM 4-Oct-2017 A Approved Closed
Zone 3B, Line 37, MH-134-L37 to MH-75-L18
Inspection of sand filling around pipe, Storm main line Dia 400mm
1993 KHEP-CI-1993 Zone 2B, Line 1 Zone 2B Division 31 1-Oct-2017 2-Oct-2017 10:00 AM 4-Oct-2017 A Approved Closed
Line 1, MH-6-L01 to MH-I8-L01
Inspection form work for base & wall and concrete pouring for storm
Line 20 & 39
manholes precast yard Zone 1B & 2B,
2010 KHEP-CI-2010
Line 20 & 39 & 17 & 07 & 15, MH-28-L07, MH-70-L20 and MH-136-
& 17 & 07 & Zone 1B & 2B Division 33 2-Oct-2017 3-Oct-2017 3:30 PM 8-Oct-2017 A Approved Closed
15
L39 and MH-50-L15 and MH-51-L15 and MH-56-L17
Dam Proofing surface preparation for RC Foundation & Column neck Cluster 60,
2019 KHEP-CI-2019
Cluster 60, BC4 BC4
NA Division 07 3-Oct-2017 4-Oct-2017 10:00 AM 7-Oct-2017 A Approved Closed
Back filling general fill final layer for pipe trench, Storm main line Dia
500 & 600mm Zone
2023 KHEP-CI-2023
3B, Line 22, MH-89-L22 to MH-90-L22 and MH-90-L22 to MH-91-L22
Line 22 Zone 3B Division 31 3-Oct-2017 4-Oct-2017 10:00 AM 5-Oct-2017 A Approved Closed
and MH-91-L22 to MH-91A-L22 and MH-91A-L22 to MH-92-L22
Dam Proofing surface preparation for RC Foundation & Column neck Cluster 23,
2026 KHEP-CI-2026
Cluster 23, BC4 BC4
NA Division 07 4-Oct-2017 5-Oct-2017 3:00 PM 7-Oct-2017 A Approved Closed
Concrete sampling, testing and placement inspection for RC Footing Cluster 74,
2043 KHEP-CI-2043
Cluster 74, BC4 BC4
NA Division 03 5-Oct-2017 7-Oct-2017 9:00 AM 8-Oct-2017 A Approved Closed
Compaction test Around Footing General fill (Final layer) Zone Cluster 45,
2050 KHEP-CI-2050
3A, Cluster 45, A6 A6
Zone 3A Division 31 5-Oct-2017 7-Oct-2017 10:30 AM 8-Oct-2017 A Approved Closed
Compaction test of Sand Filling Above the pipe trench and laying
warning tape Storm Maine Line Dia 500mm
2052 KHEP-CI-2052
Zone 3B, Line 27, MH-100-L27 to MH-I99-L27 and
Line 27 Zone 3B Division 31 5-Oct-2017 7-Oct-2017 11:30 AM 8-Oct-2017 A Approved Closed
MH-I99-L27 to MH-I98-L27
Compaction test of Sand Filling Above the pipe trench Storm Maine
2053 KHEP-CI-2053 Line Dia 500mm Zone Line 27 Zone 3B Division 31 5-Oct-2017 7-Oct-2017 11:30 AM 8-Oct-2017 A Approved Closed
3B, Line 27, MH-I98-L27 to MH-I99-L28
Inspection of excavated formation for pipe Embedded (Short piece)
Storm main line Dia 400mm Zone Line 10 & 11
2054 KHEP-CI-2054
1B, Line 10 & 11 & 13, MH-I31-L10 and MH-I33-L11 and MH-I34-L11 & 13
Zone 1B Division 31 5-Oct-2017 7-Oct-2017 2:00 PM 8-Oct-2017 A Approved Closed
and MH-I41-L13 and MH-I42-L13
Inspection of Dam Proofing surface preparation for storm manholes,
precast yard Zone 2B & 4B, Line 3 & 4 &
2055 KHEP-CI-2055
Line 3 & 4 & 5 & 33, MH-I7-L03 and MH-I12-L04 and MH-I11-L05, 5 & 33
Zone 2B & 4B Division 33 5-Oct-2017 7-Oct-2017 3:00 PM 9-Oct-2017 A Approved Closed
MH-I122-L33
Installation of reinforcing steel bar, embedded item and form closure
2056 KHEP-CI-2056 inspection for RC Column (Ground Floor) Cluster 61, B2 NA Division 03 5-Oct-2017 7-Oct-2017 10:00 AM 8-Oct-2017 A Approved Closed
Cluster 61, B2
Cast in place concrete form work inspection for Rc Roof Slab Approved w/
2057 KHEP-CI-2057
Cluster 14, B2
Cluster 14 B2 NA Division 03 5-Oct-2017 7-Oct-2017 10:00 AM 8-Oct-2017 B comments
Closed
Concrete sampling, testing and placement inspection for RC Footing Cluster 41,
2062 KHEP-CI-2062
Cluster 41, BC4 BC4
NA Division 03 7-Oct-2017 8-Oct-2017 9:00 AM 8-Oct-2017 A Approved Closed
Cast in place concrete form work inspection for Rc Column neck Cluster 28,
2073 KHEP-CI-2073
Cluster 28, BC4 BC4
NA Division 03 8-Oct-2017 9-Oct-2017 10:00 AM 10-Oct-2017 A Approved Closed
Back filling general fill final layer for pipe trench, Storm main line Dia
2086 KHEP-CI-2086 500 & 400mm Zone Line 3 & 1 Zone 3B Division 31 8-Oct-2017 9-Oct-2017 10:00 AM 9-Oct-2017 A Approved Closed
3B, Line 3 & 1, MH-I7-L03 to MH-I8-L01 and MH-I8-L01 to MH-9-L01
Back filling general fill final layer for pipe trench, Storm main line Dia
2087 KHEP-CI-2087 500mm Zone 3B, Line 20 Zone 3B Division 31 8-Oct-2017 9-Oct-2017 10:00 AM 9-Oct-2017 A Approved Closed
Line 20, MH-67-L20 to MH-68-L20
Back filling general fill final layer for pipe trench, Storm main line Dia
2088 KHEP-CI-2088 400mm Zone 4B, Line 36 Zone 4B Division 31 8-Oct-2017 9-Oct-2017 10:00 AM 9-Oct-2017 A Approved Closed
Line 36, MH-133-L36 to MH-126-L26
First coat, Bituminous damp proofing installation inspection for storm
manholes, precast yard Zone 2B & Line 3 & 4 &
2089 KHEP-CI-2089
4B, Line 3 & 4 & 5 & 33, MH-I7-L03 and MH-I12-L04,MH-I11-L05, 5 & 33
Zone 2B & 4B Division 33 8-Oct-2017 9-Oct-2017 3:00 PM 10-Oct-2017 A Approved Closed
MH-I122-L33
Check the survey work, elevation and coordinate for billnding under
grade beam
2093 KHEP-CI-2093
Cluster 63, B2
Cluster 63, B2 NA Division 03 9-Oct-2017 10-Oct-2017 2:00 PM 11-Oct-2017 A Approved Closed
Inspection Formwork for base & wall and concrete pouring for Storm
Manholes (Precast yard) Line 7 15 22 Zone 1B,2B &
2099 KHEP-CI-2099
Zone 1B & 2B & 3B, Line 7 15 22 & 35, MH-29-L07, MH- & 35 3B
Division 33 9-Oct-2017 10-Oct-2017 11:30 AM 11-Oct-2017 A Approved Closed
52-L15 and MH-54-L15, MH-90-L22 and MH-91-L22 and MH132-L35
Inspection of damproofing surface preparation for strom manholes,
(Precast yard) Zone 2B & 3B, Line 7,20 &
2100 KHEP-CI-2100
Line 7,20 & 21, MH-27-L07, MH-67-L20 and MH-68-L20 and MH-69- 21
Zone 2B & 3B Division 33 9-Oct-2017 10-Oct-2017 3:00 PM 11-Oct-2017 A Approved Closed
L20, MH-77-L21 and MH-78-L21
Cast in place concrete formwork inspection for Rc grade beam
2101 KHEP-CI-2101
Cluster 73, B2
Cluster 73, B2 NA Division 03 9-Oct-2017 10-Oct-2017 10:00 AM 11-Oct-2017 A Approved Closed
Inspection of sand filling around pipe - sewer Maine line Dia 200mm
2111 KHEP-CI-2111 Line 01 Zone 3B Division 31 9-Oct-2017 10-Oct-2017 10:00 AM 10-Oct-2017 A Approved Closed
Zone 3B, Line 1, MH-15-L01 to MH-14-L01
Concrete sampling, testing and placement inspection for RC footing Cluster 40,
2113 KHEP-CI-2113
Cluster 40, BC4 BC4
NA Division 03 10-Oct-2017 11-Oct-2017 2:30 PM 11-Oct-2017 A Approved Closed
Cast in place concrete formwork inspection for RC Column neck Cluster 42,
2119 KHEP-CI-2119
Cluster 42, BC4 BC4
NA Division 03 10-Oct-2017 11-Oct-2017 10:00 AM 12-Oct-2017 A Approved Closed
Check the survey work, elevation and coordinate for billnding under
grade beam
2120 KHEP-CI-2120
Cluster 35, B2
Cluster 35, B2 NA Division 03 10-Oct-2017 11-Oct-2017 2:00 PM 12-Oct-2017 A Approved Closed
Cast in place concrete formwork inspection for RC Column ground
2121 KHEP-CI-2121 floor Cluster 61, B2 NA Division 03 10-Oct-2017 11-Oct-2017 1:30 PM 12-Oct-2017 A Approved Closed
Cluster 61, B2
Sampling - Marl materials from supplier (saad areemat.EST) Jobsite Stcok Approved w/
2122 KHEP-CI-2122
JobsiteStock file 14 file 14
N/A Division 31 10-Oct-2017 11-Oct-2017 10:30 AM 11-Oct-2017 B comments
Closed
Compact test 1st and final layer structural fill (selected fill) Zone 4B, Cluster 70,
2123 KHEP-CI-2123
Cluster 70, BC4 BC4
Zone 4B Division 31 10-Oct-2017 11-Oct-2017 1:30 PM 12-Oct-2017 A Approved Closed
Second coat, Damp proofing installation inspection for RC Footing & Cluster 60,
2152 KHEP-CI-2152
Column Neck Cluster 60, BC4 BC4
NA Division 07 12-Oct-2017 14-Oct-2017 10:00 AM 14-Oct-2017 A Approved Closed
First coat, Damp proofing installation inspection for RC Footing & Cluster 22,
2153 KHEP-CI-2153
Column Neck Cluster 22, BC4 BC4
NA Division 07 12-Oct-2017 14-Oct-2017 10:00 AM 14-Oct-2017 A Approved Closed
Check the survey work, elevation and coordinate for blinding under
Cluster 70, Approved w/
2160 KHEP-CI-2160 Footing Cluster 70,
BC4
NA Division 03 14-Oct-2017 16-Oct-2017 2:00 PM 17-Oct-2017 B comments
Closed
BC4
Check the survey work, elevation and coordinate for blinding under
2161 KHEP-CI-2161 Grade Beam Cluster Cluster 72, B2 NA Division 03 14-Oct-2017 16-Oct-2017 2:00 PM 17-Oct-2017 A Approved Closed
72, B2
Concrete sampling, testing and placement inspection for RC Column
2162 KHEP-CI-2162 (Ground Floor) Cluster 61, B2 NA Division 03 14-Oct-2017 15-Oct-2017 9:00 AM 15-Oct-2017 A Approved Closed
Cluster 61, B2
Concrete sampling, testing and placement inspection for RC Grade
2163 KHEP-CI-2163 Beam Cluster 58, Cluster 58, B2 NA Division 03 14-Oct-2017 15-Oct-2017 9:00 AM 15-Oct-2017 A Approved Closed
B2
Concrete sampling, testing and placement inspection for RC Column
Cluster 42,
2164 KHEP-CI-2164 Neck Cluster 42,
BC4
NA Division 03 14-Oct-2017 15-Oct-2017 9:00 AM 15-Oct-2017 A Approved Closed
BC4
Blinding Concrete sampling, testing and placement inspection for
Cluster 43,
2165 KHEP-CI-2165 Grade Beam Cluster
A6
NA Division 03 14-Oct-2017 15-Oct-2017 9:00 AM 15-Oct-2017 A Approved Closed
43, A6
Blinding Concrete sampling, testing and placement inspection for
2166 KHEP-CI-2166 Grade Beam Cluster Cluster 27, B2 NA Division 03 14-Oct-2017 15-Oct-2017 9:00 AM 15-Oct-2017 A Approved Closed
27, B2
Check the survey work, elevation and coordinate for blinding under
2167 KHEP-CI-2167 Grade Beam Cluster Cluster 33, B2 NA Division 03 14-Oct-2017 15-Oct-2017 2:00 PM 15-Oct-2017 A Approved Closed
33, B2
Check the survey work, elevation and coordinate for blinding under
2168 KHEP-CI-2168 Grade Beam Cluster Cluster 34, B2 NA Division 03 14-Oct-2017 15-Oct-2017 2:00 PM 15-Oct-2017 A Approved Closed
34, B2
Second Coat, Damproofing installation inspection and for RC footing
Cluster 22,
2169 KHEP-CI-2169 & column neck Cluster 22,
BC4
NA Division 07 14-Oct-2017 15-Oct-2017 10:00 AM 16-Oct-2017 A Approved Closed
BC4
Installation of reinforced steel bar, embedded item & form closure
Cluster 41,
2170 KHEP-CI-2170 inspection for RC Column Neck Cluster 41,
BC4
NA Division 03 14-Oct-2017 15-Oct-2017 10:00 AM 16-Oct-2017 A Approved Closed
BC4
Inspection of excavated and Compaction formation for storm
manholes - storm main line
2171 KHEP-CI-2171
Zone 1B, Line 9, MH-I22-L09 and MH-I23-L09 ,
Line 9 Zone 1B Division 31 14-Oct-2017 15-Oct-2017 1:30 PM 16-Oct-2017 A Approved Closed
MH-I24-L09 and MH-I25-L09
Inspection of reinforcement steel brand Form work for base and
concrete pouring for Sewer GRP Manholes
Line 5 & 3 &
2172 KHEP-CI-2172 Zone 1B, Line 5 & 3 & 6 & 8, MH-
6&8
Zone 1B Division 33 14-Oct-2017 15-Oct-2017 11:30 AM 16-Oct-2017 A Approved Closed
1-L06 and MH-4-L08 and MH-1A-L03 and MH-1-L03 and MH-1-L05
and MH-2-L05
Concrete sampling, testing and placement inspection for RC Column
Cluster 76, Approved w/
2173 KHEP-CI-2173 Neck Cluster 76,
BC4
NA Division 03 15-Oct-2017 16-Oct-2017 9:00 AM 17-Oct-2017 B comments
Closed
BC4
Concrete sampling, testing and placement inspection for RC Column
Approved w/
2174 KHEP-CI-2174 (First floor) Cluster Cluster 7, B2 NA Division 03 15-Oct-2017 16-Oct-2017 9:00 AM 17-Oct-2017 B comments
Closed
7, B2
Concrete sampling, testing and placement inspection for RC Roof
Approved w/
2175 KHEP-CI-2175 Slab Cluster 10, Cluster 10 B2 NA Division 03 15-Oct-2017 16-Oct-2017 9:00 AM 17-Oct-2017 B comments
Closed
B2
Concrete sampling, testing and placement inspection for RC Roof
Approved w/
2176 KHEP-CI-2176 Slab Cluster 73, Cluster 73, B2 NA Division 03 15-Oct-2017 16-Oct-2017 9:00 AM 17-Oct-2017 B comments
Closed
B2
Cast in place concrete formwork inspection for RC Stair (First Flight)
Cluster 16
2177 KHEP-CI-2177 Cluster
BC4
NA Division 03 15-Oct-2017 16-Oct-2017 10:00 AM 17-Oct-2017 A Approved Closed
16, BC4
Installation of reinforced steel bar, embedded item & form closure
Cluster 16
2178 KHEP-CI-2178 inspection for RC Stair (First Flight)
BC4
NA Division 03 15-Oct-2017 16-Oct-2017 10:00 AM 17-Oct-2017 A Approved Closed
Cluster 16, BC4
Cast in place concrete formwork inspection for RC Stair (First Flight)
2179 KHEP-CI-2179 Cluster 8, Cluster 8, B2 NA Division 03 15-Oct-2017 16-Oct-2017 10:00 AM 17-Oct-2017 A Approved Closed
B2
Installation of reinforced steel bar, embedded item & form closure
2180 KHEP-CI-2180 inspection for RC Stair (First Flight) Cluster 8, B2 NA Division 03 15-Oct-2017 16-Oct-2017 10:00 AM 17-Oct-2017 A Approved Closed
Cluster 8, B2
Cast in place concrete formwork inspection for RC Stair (First Flight)
2181 KHEP-CI-2181 Cluster Cluster 61, B2 NA Division 03 15-Oct-2017 16-Oct-2017 10:00 AM 17-Oct-2017 A Approved Closed
61, B2
Installation of reinforced steel bar, embedded item & form closure
2182 KHEP-CI-2182 inspection for RC Stair (First Flight) Cluster 61, B2 NA Division 03 15-Oct-2017 16-Oct-2017 10:00 AM 17-Oct-2017 A Approved Closed
Cluster 61, B2
Cast in place concrete formwork inspection for RC Grade Beam
2183 KHEP-CI-2183
Cluster 51, B2
Cluster 51, B2 NA Division 03 15-Oct-2017 16-Oct-2017 2:00 PM 18-Oct-2017 A Approved Closed
Dam Proofing surface preparation for RC Foundation & Column neck Cluster 25,
2185 KHEP-CI-2185
Cluster 25, BC4 BC4
NA Division 07 15-Oct-2017 16-Oct-2017 2:00 PM 18-Oct-2017 A Approved Closed
Cast in place concrete formwork inspection for RC Grade Beam Cluster 44,
2196 KHEP-CI-2196
Cluster 44, A6 A6
NA Division 03 16-Oct-2017 17-Oct-2017 10:00 AM 18-Oct-2017 A Approved Closed
Compaction test of Sand Filling Above the pipe trench and laying
warning tape Storm Maine Line Dia 400mm
2228 KHEP-CI-2228
Zone 5C, Line 34, MH-128-L34 to MH-129-L34
Line 34 Zone 5C Division 31 18-Oct-2017 19-Oct-2017 10:00 AM 19-Oct-2017 A Approved Closed
and MH-129-L34 to MH-130-L34 and MH-130-34 to MH-131-L34
Inspection of excavated and Compaction formation for storm
manholes - Sewer main line Approved w/
2229 KHEP-CI-2229
Zone 1B, Line 8 & 34, MH-1-L08 and MH-1A-L34
Line 8 & 34 Zone 1B Division 31 18-Oct-2017 19-Oct-2017 1:30 PM 21-Oct-2017 B comments
Closed
and MH-1-L34
Installation of reinforced steel bar, embedded item & form closure
2230 KHEP-CI-2230 inspection for RC Grade Beam Cluster 54, B2 NA Division 03 18-Oct-2017 19-Oct-2017 10:00 AM 21-Oct-2017 E Rejected Closed
Cluster 54, B2
Installation of reinforced steel bar, embedded item & form closure
2230.1 KHEP-CI-2230-01 inspection for RC Grade Beam Cluster 54, B2 NA Division 03 22-Oct-2017 23-Oct-2017 10:00 AM 24-Oct-2017 A Approved Closed
Cluster 54, B3
Damproofing surface preparation for RC Grade beam (From Inside)
2231 KHEP-CI-2231 Cluster Cluster 01 A6 NA Division 07 18-Oct-2017 19-Oct-2017 10:00 AM 19-Oct-2017 A Approved Closed
1, A6
First coat, Bituminous damp proofing installation inspection for storm
manholes, precast yard Zone 2B & Line 4 & 27 & Zone 2B & 3B
2232 KHEP-CI-2232
3B & 4B, Line 4 & 27 & 32 & 33, MH-I10-L04 and MH-I98-L27,MH- 32 & 33 & 4B
Division 33 19-Oct-2017 21-Oct-2017 10:00 AM 22-Oct-2017 A Approved Closed
I113-L32 and MH-I121-L33
Blinding Concrete sampling, testing and placement inspection for
Manhole Storm Main Line
2233 KHEP-CI-2233
Zone 1B, Line 9, MH-I22-L09 and MH-I23-L09 and MH-I24-L09
Line 9 Zone 1B Division 31 19-Oct-2017 21-Oct-2017 1:30 PM 22-Oct-2017 A Approved Closed
and MH-I25-L09
Back filling general fill final layer for pipe trench, Storm main line Dia
400mm Zone 4B, Approved w/
2235 KHEP-CI-2235
Line 33, MH-I121-L33 to MH-I122-L33 and MH-I122-L33 to MH-I123-
Line 33 Zone 4B Division 31 19-Oct-2017 21-Oct-2017 10:00 AM 21-Oct-2017 B comments
Closed
L33
Back filling general fill final layer for pipe trench, Sewer main line Dia
200mm Zone 4B,
Approved w/
2236 KHEP-CI-2236 Line 18 & 19, MH-3-L19 to MH-2-L19 and MH-2-L19 to MH-1-L19 Line 18 & 19 Zone 4B Division 31 19-Oct-2017 21-Oct-2017 10:00 AM 21-Oct-2017 B comments
Closed
and MH-1-L19 to MH-21-L01 and MH-1-L18 to MH-1A-L18 and MH-
1A-L18 to MH-2-L19
Back filling general fill final layer for pipe trench, Sewer main line Dia
200mm Zone 3B, Approved w/
2237 KHEP-CI-2237
Line 2, MH-18-L02 to MH-17-L02 and MH-17-L02 to MH-16-L02 and
Line 2 Zone 3B Division 31 19-Oct-2017 21-Oct-2017 10:00 AM 21-Oct-2017 B comments
Closed
MH-16-L02 to MH-15-L02 and MH-15-L02 to MH-14-L02
Cast in place concrete form work inspection for RC Footing Cluster 67, Approved w/
2240 KHEP-CI-2240
Cluster 67, A4 A4
NA Division 03 19-Oct-2017 21-Oct-2017 10:00 AM 21-Oct-2017 B comments
Closed
Second coat dam proofing installation inspection for CMU, Morter and
Cluster 21,
2249 KHEP-CI-2249 Masonry inspection under exterior reinforced grade beam
BC4
NA Division 07 19-Oct-2017 21-Oct-2017 10:30 AM 21-Oct-2017 E Rejected Closed
Cluster 21, BC4
Second coat dam proofing installation inspection for CMU, Morter and
Cluster 21,
2249.1 KHEP-CI-2249-01 Masonry inspection under exterior reinforced grade beam
BC4
NA Division 07 23-Oct-2017 24-Oct-2017 10:00 AM 25-Oct-2017 A Approved Closed
Cluster 21, BC4
Concrete sampling, testing and placement inspection for RC Footing Cluster 67, Approved w/
2276 KHEP-CI-2276
Cluster 67, A4 A4
NA Division 03 23-Oct-2017 24-Oct-2017 9:00 AM 25-Oct-2017 B comments
Closed
Compaction Test for backfiling of Pre Final layer under Grade on Slab
at Cluster 1 Villa 2 Approved w/
2332 KHEP-CI-2332
Cluster 1, A6
Cluster 01 A6 NA Division 33 26-Oct-2017 28-Oct-2017 2:00 PM 1-Nov-2017 B comments
Closed
Compaction Test for backfiling Select Fill Final layer under Grade on
Slab at Cluster 1 Villa 3 & 4 Approved w/
2333 KHEP-CI-2333
Cluster 1, A6
Cluster 01 A6 NA Division 33 26-Oct-2017 28-Oct-2017 2:30 PM 4-Nov-2017 E comments
Closed
Second Coat, Damproofing installation inspection For Column Neck & Cluster 56,
2359 KHEP-CI-2359
Footing Cluster 56, BC4 BC4
NA Division 07 29-Oct-2017 30-Oct-2017 10:00 AM 30-Oct-2017 A Approved Closed
First coat dam proofing installation inspection for CMU, Morter and
Cluster 46,
2362 KHEP-CI-2362 Masonry inspection under exterior reinforced grade beam
A6
NA Division 07 29-Oct-2017 30-Oct-2017 10:00 AM 1-Nov-2017 A Approved Closed
Cluster 46, A6
Cast in place concrete form work inspection for RC Column (Ground Cluster 44,
2363 KHEP-CI-2363
Floor) Axis (H-to-N) Cluster 44, A6 A6
NA Division 03 29-Oct-2017 30-Oct-2017 2:30 PM 1-Nov-2017 A Approved Closed
First coat dam proofing installation inspection for CMU, Morter and
Cluster 65, Approved w/
2364 KHEP-CI-2364 Masonry inspection under exterior reinforced grade beam
A6
NA Division 07 29-Oct-2017 30-Oct-2017 10:00 AM 1-Nov-2017 B comments
Closed
Cluster 65, A6
First coat dam proofing installation inspection for CMU, Morter and
Cluster 24,
2365 KHEP-CI-2365 Masonry inspection under exterior reinforced grade beam
BC4
NA Division 07 29-Oct-2017 30-Oct-2017 10:00 AM 1-Nov-2017 A Approved Closed
Cluster 24, BC4
Cast in place concrete form work inspection for RC Grade Beam Approved w/
2366 KHEP-CI-2366
Cluster 35, B2
Cluster 35, B2 NA Division 03 29-Oct-2017 30-Oct-2017 2:30 PM 1-Nov-2017 B comments
Closed
Compaction Test for backfiling Final layer under Grade on Slab at
Cluster 1, Villa 3 & 4 Approved w/
2367 KHEP-CI-2367
Zone 1B, Cluster 1, A6
Cluster 01 A6 Zone 1B Division 31 29-Oct-2017 30-Oct-2017 2:30 PM 1-Nov-2017 B comments
Closed
Inspection of reinforcement steel bar and Form work for base for
Sewer GRP Manholes (Precast ard)
2374 KHEP-CI-2374
Zone 2B & 4B, Line 1, MH-11-L01 and MH-17-L01 and MH-18-L01
Line 1 Zone 2B & 4B Division 33 30-Oct-2017 31-Oct-2017 10:00 AM 1-Nov-2017 A Approved Closed
and MH-23-L01 and MH-24-L01 and MH-25-L01 and MH-26-L01 and
Compaction Test for backfiling of Pre Final layer under slab on Grade
2375 KHEP-CI-2375 at Cluster 15 From Axis (C) to (E) Zone Cluster 15 B2 Zone 1B Division 31 30-Oct-2017 31-Oct-2017 2:30 PM 5-Nov-2017 A Approved Closed
1B, Cluster 15, B2
Termite control surface preparation, installation and final inspection
Cluster 49,
2376 KHEP-CI-2376 for Footing Cluster
BC6
NA Division 03 30-Oct-2017 31-Oct-2017 10:00 AM 31-Oct-2017 A Approved Closed
49, BC6
Termite control surface preparation, installation and final inspection
Cluster 45,
2377 KHEP-CI-2377 for Grade Beam Cluster
A6
NA Division 03 30-Oct-2017 31-Oct-2017 10:00 AM 31-Oct-2017 A Approved Closed
45, A6
Back filling general fill final layer for pipe trench, Sewer main line Dia
200mm Zone 3B,
2378 KHEP-CI-2378 Line 15 & 16, MH-4-L16 to MH-3-L16 and MH-3-L16 to MH-3A-L16 Line 15 & 16 Zone 3B Division 31 31-Oct-2017 1-Nov-2017 10:00 AM 1-Nov-2017 A Approved Closed
and MH-3A-L16 to MH-2-L16 and MH-2-L16 to MH-1-L16 and MH-1-
L16 to MH-16-L16 and MH-1-L15 to MH-2-L16
Cast in place concrete form work inspection for RC Footing Cluster Cluster 39,
2395 KHEP-CI-2395
39, BC6 BC6
NA Division 03 31-Oct-2017 1-Nov-2017 10:00 AM 1-Nov-2017 A Approved Closed
Installation of reinforced steel bar, embedded item & form closure Cluster 39,
2396 KHEP-CI-2396
inspection for RC Footing Cluster 39, BC6 BC6
NA Division 03 31-Oct-2017 1-Nov-2017 10:00 AM 1-Nov-2017 A Approved Closed
Inspection Form work and concrete Pouring for Sewer embedded
piece at Manholes Line 3 & 4 &
2397 KHEP-CI-2397
Zone 1B, Line 3 & 4 & 5, MH-1-L03 and MH-1A-L03 and MH-1- 5
Zone 1B Division 31 1-Nov-2017 2-Nov-2017 11:30 AM 4-Nov-2017 A Approved Closed
L04 and MH-1-L05
Building concrete sampling, testing and placement inspection for
manholes, Storm main line
2398 KHEP-CI-2398
Zone 1B, Line 15, MH-47-L15 and MH-48-L15, MH-49-L15 and MH-
Line 15 Zone 1B Division 31 1-Nov-2017 2-Nov-2017 1:30 PM 4-Nov-2017 A Approved Closed
50-L15 and MH-51-L15 and MH-52-L15
Concrete sampling, testing and placement inspection for Rc Column
Cluster 40, Approved w/
2399 KHEP-CI-2399 Neck Cluster 40,
BC4
NA Division 03 1-Nov-2017 2-Nov-2017 9:00 AM 4-Nov-2017 B comments
Closed
BC4
Concrete sampling, testing and placement inspection for Rc Grade
Approved w/
2400 KHEP-CI-2400 Beam Cluster 35, Cluster 35, B2 NA Division 03 1-Nov-2017 2-Nov-2017 9:00 AM 4-Nov-2017 B comments
Closed
B2
Cast in place concrete form work inspection for RC Column Neck
Cluster 74,
2401 KHEP-CI-2401 Cluster 74,
BC4
NA Division 03 1-Nov-2017 2-Nov-2017 11:00 AM 4-Nov-2017 A Approved Closed
BC4
Cast in place concrete form work inspection for RC Footing Cluster 47,
2402 KHEP-CI-2402
Cluster 47, BC6 BC6
NA Division 03 1-Nov-2017 2-Nov-2017 11:00 AM 4-Nov-2017 A Approved Closed
Installation of reinforced steel bar, embedded item & form closure Cluster 47,
2403 KHEP-CI-2403
inspection for RC Footing Cluster 47, BC6 BC6
NA Division 03 1-Nov-2017 2-Nov-2017 11:00 AM 4-Nov-2017 A Approved Closed
Cast in place concrete form work inspection for RC Column Neck Cluster 67,
2410 KHEP-CI-2410
Cluster 67, A4 A4
NA Division 03 02-11-20017 4-Nov-2017 9:30 AM 4-Nov-2017 A Approved Closed
Second coat dam proofing installation inspection for CMU, Morter and
Cluster 46,
2414 KHEP-CI-2414 Masonry inspection under exterior reinforced grade beam
A6
NA Division 07 02-11-20017 4-Nov-2017 10:00 AM 4-Nov-2017 A Approved Closed
Cluster 46, A6
Second coat dam proofing installation inspection for CMU, Morter and
Cluster 24, Approved w/
2415 KHEP-CI-2415 Masonry inspection under exterior reinforced grade beam
BC4
NA Division 07 02-11-20017 4-Nov-2017 10:00 AM 4-Nov-2017 B comments
Closed
Cluster 24, BC4
70cm, CMU motor and masonry inspection under exterior reinforced Cluster 30,
2416 KHEP-CI-2416
grade beam Cluster 30, B2 B2
NA Division 04 02-11-20017 4-Nov-2017 2:00 PM 6-Nov-2017 A Approved Closed
Cast in place concrete form work inspection for RC Footing Cluster 49,
2417 KHEP-CI-2417
Cluster 49, BC6 BC6
NA Division 03 02-11-20017 4-Nov-2017 10:00 AM 4-Nov-2017 A Approved Closed
Installation of reinforced steel bar, embedded item & form closure Cluster 49,
2418 KHEP-CI-2418
inspection for RC Footing Cluster 49, BC6 BC6
NA Division 03 02-11-20017 4-Nov-2017 10:00 AM 4-Nov-2017 A Approved Closed
Concrete sampling, testing and placement inspection for Rc Footing Cluster 39,
2419 KHEP-CI-2419
Cluster 39, BC6 BC6
NA Division 03 4-Nov-2017 5-Nov-2017 9:00 AM 6-Nov-2017 A Approved Closed
Compaction test for backfilling of pre final layer under slab grade axis
2424 KHEP-CI-2424
(A-C) Cluster 15, B2
Cluster 15 B2 NA Division 03 5-Nov-2017 6-Nov-2017 10:00 AM 7-Nov-2017 A Approved Closed
Cast in place concrete form work inspection for First Floor Slab and
2425 KHEP-CI-2425 beam Cluster 75, B2 NA Division 03 5-Nov-2017 6-Nov-2017 10:30 AM 8-Nov-2017 A Approved Closed
Cluster 75, B2
Cast in place concrete Reinforcement and Embedded items
Approved w/
2426 KHEP-CI-2426 inspection for First Floor Slab and beam Cluster 75, B2 NA Division 03 5-Nov-2017 6-Nov-2017 10:30 AM 8-Nov-2017 B comments
Closed
Cluster 75, B2
Concrete sampling, testing and placement inspection for Rc Column
Cluster 74,
2427 KHEP-CI-2427 Neck Cluster
BC4
NA Division 03 5-Nov-2017 6-Nov-2017 10:30 AM 7-Nov-2017 A Approved Closed
74, BC4
Concrete sampling, testing and placement inspection for Rc Footing Cluster 47, Approved w/
2448 KHEP-CI-2448
Cluster 47, BC6 BC6
NA Division 03 6-Nov-2017 7-Nov-2017 10:30 AM 8-Nov-2017 B comments
Closed
Second coat dam proofing installation inspection for CMU, Morter and
Cluster 23,
2454 KHEP-CI-2454 Masonry inspection under exterior reinforced grade beam
BC4
NA Division 07 6-Nov-2017 7-Nov-2017 10:00 AM 8-Nov-2017 A Approved Closed
Cluster 23, BC4
Cast in place concrete form work inspection for RC First Floor Slab Approved w/
2459 KHEP-CI-2459
Cluster 8, B2
Cluster 8, B2 NA Division 03 7-Nov-2017 8-Nov-2017 10:00 AM 11-Nov-2017 B comments
Closed
Cast in place concrete form work inspection for RC Stair (First Flight
Approved w/
2462 KHEP-CI-2462 & Second Flight) Cluster 75, B2 NA Division 03 7-Nov-2017 8-Nov-2017 9:00 AM 9-Nov-2017 B comments
Closed
Cluster 75, B2
Concrete sampling, testing and placement inspection for Rc Footing Cluster 49, Approved w/
2463 KHEP-CI-2463
Cluster 49, BC6 BC6
NA Division 03 7-Nov-2017 8-Nov-2017 10:30 AM 9-Nov-2017 B comments
Closed
Inspection Form work for base & wall and concrete Pouring for Storm
Manholes (Precast yard) Line 1 & 7 & Zone 2B, 3B &
2469 KHEP-CI-2469
Zone 2B, 3B & 4B, Line 1 & 7 & 27, MH-111-L27 to MH-2- 27 4B
Division 33 7-Nov-2017 8-Nov-2017 11:30 AM 9-Nov-2017 A Approved Closed
L01 and MH-3-L01 and MH-16-L01 and MH-17-L07 and MH-18-L07
Concrete sampling, testing and placement inspection for Rc Stair
Approved w/
2470 KHEP-CI-2470 First Flight Cluster 51, B2 NA Division 03 7-Nov-2017 8-Nov-2017 10:30 AM 9-Nov-2017 B comments
Closed
Cluster 51, B2
First coat dam proofing installation inspection for CMU, Morter and
Cluster 18
2471 KHEP-CI-2471 Masonry inspection under exterior reinforced grade beam
BC4
NA Division 07 7-Nov-2017 8-Nov-2017 3:00 PM 9-Nov-2017 A Approved Closed
Cluster 18, BC4
Cast in place concrete form work inspection for RC Footing Cluster 70,
2472 KHEP-CI-2472
Cluster 70, BC4 BC4
NA Division 03 8-Nov-2017 9-Nov-2017 10:00 AM 11-Nov-2017 A Approved Closed
Cast in place concrete formwork inspection for Rc First Floor Slab &
2483 KHEP-CI-2483
Stair (Second Flight) Cluster 61, B2
Cluster 61, B2 NA Division 03 9-Nov-2017 11-Nov-2017 2:00 PM 13-Nov-2017 A Approved Closed
Concrete sampling, testing and placement inspection for First Floor &
2485 KHEP-CI-2485
Stair (First & Second Flight) Cluster 75, B2
Cluster 75, B2 NA Division 03 9-Nov-2017 11-Nov-2017 9:30 AM 13-Nov-2017 A Approved Closed
Inspection of Reinforcement steel bar, Form work for base for Sewer
GRP Manholes (Precast yard) Zone 2B, Line 9
& 10 & 11 & 12 & 27, MH-5-L27 to MH-4-L27 and MH-3-L09 and Line 9 & 10 &
2487 KHEP-CI-2487
MH-2-L09 and MH-1-L09 and MH-1A-L09 and MH-1-L10 and MH-1A- 11 & 12 & 27
Zone 2B Division 33 9-Nov-2017 11-Nov-2017 10:00 AM 11-Nov-2017 A Approved Closed
L10 and MH-1-L11 and MH-1A-L11 and MH-3-L12 and MH-2-L12 and
MH-1-L12
Second coat dam proofing installation inspection for CMU, Morter and
Cluster 18
2492 KHEP-CI-2492 Masonry inspection under exterior reinforced grade beam
BC4
NA Division 07 9-Nov-2017 11-Nov-2017 10:00 AM 11-Nov-2017 A Approved Closed
Cluster 18, BC4
First coat dam proofing installation inspection for CMU, Morter and
2493 KHEP-CI-2493 Masonry inspection under exterior reinforced grade beam Cluster 30, Cluster 30, B2 NA Division 07 9-Nov-2017 11-Nov-2017 2:00 PM 15-Nov-2017 A Approved Closed
B2
Back filling general fill final layer for pipe trench, Sewer main line Dia
200mm Zone 3B,
Approved w/
2494 KHEP-CI-2494 Line 13 & 14, MH-2-L14 to MH-1-L14 and MH-1-L14 to MH-1A-L14 Line 13 & 14 Zone 3B Division 31 9-Nov-2017 11-Nov-2017 10:00 AM 11-Nov-2017 B comments
Closed
and MH-1A-L14 to MH-1-L13 and MH-2-L13 to MH-1-L13 and MH-1-
L13 to MH-1A-L13 and MH-1A-L13 to MH-14-L01
Back filling general fill final layer for pipe trench, Sewer main line Dia
2495 KHEP-CI-2495 200mm Zone 3B, Line 1 Zone 3B Division 31 9-Nov-2017 11-Nov-2017 10:00 AM 11-Nov-2017 A Approved Closed
Line 1, MH-15-L01 to MH-14-L01
Back filling general fill final layer for pipe trench, Sewer main line Dia
200mm Zone 5C, Approved w/
2496 KHEP-CI-2496
Line 34, MH-128-L34 to MH-129-L34 and MH-129-L34 to MH-130-
Line 34 Zone 5C Division 31 9-Nov-2017 11-Nov-2017 10:00 AM 11-Nov-2017 B comments
Closed
L34 and MH-130-L34 to MH-131-L34
Installation of reinforced steel bar, embedded item & form closure
2497 KHEP-CI-2497 inspection for RC Column (First Floor) Cluster 8, Cluster 8, B2 NA Division 03 11-Nov-2017 12-Nov-2017 2:00 PM 13-Nov-2017 A Approved Closed
B2
Damproofing surface preparation for RC Footing & Column Neck
Cluster 40,
2498 KHEP-CI-2498 Cluster 40,
BC4
NA Division 07 11-Nov-2017 12-Nov-2017 2:00 PM 13-Nov-2017 A Approved Closed
BC4
Installation of reinforced steel bar, embedded item & form closure
2499 KHEP-CI-2499 inspection for RC Column (Ground Floor) Cluster Cluster 35, B2 NA Division 03 11-Nov-2017 12-Nov-2017 10:00 AM 13-Nov-2017 A Approved Closed
35, B2
Cast in place concrete formwork inspection for Column Neck Cluster 39,
2500 KHEP-CI-2500
Cluster 39, BC6 BC6
NA Division 03 11-Nov-2017 12-Nov-2017 10:00 AM 13-Nov-2017 A Approved Closed
Second coat dam proofing installation inspection for CMU, Morter and
2513 KHEP-CI-2513 Masonry inspection under exterior reinforced grade beam Cluster 30, B2 NA Division 07 12-Nov-2017 13-Nov-2017 10:00 AM 13-Nov-2017 A Approved Closed
Cluster 30, B2
First coat dam proofing installation inspection for CMU, Morter and
Cluster 22,
2514 KHEP-CI-2514 Masonry inspection under exterior reinforced grade beam
BC4
NA Division 07 12-Nov-2017 13-Nov-2017 2:00 PM 15-Nov-2017 A Approved Closed
Cluster 22, BC4
Compaction test (First Layer) for Back Filling of pre final layer under
Approved w/
2515 KHEP-CI-2515 slab on Grade axis (A-J) Cluster 01 A6 NA Division 03 12-Nov-2017 13-Nov-2017 2:00 PM 13-Nov-2017 B comments
Closed
Cluster 1, A6
First Coat, Damproofing installation Inspection for RC Footing &
Cluster 41,
2516 KHEP-CI-2516 Column Neck
BC4
NA Division 07 12-Nov-2017 13-Nov-2017 10:00 AM 14-Nov-2017 A Approved Closed
Cluster 41, BC4
70cm, CMU motor and masonry inspection under exterior reinforced
Cluster 55,
2517 KHEP-CI-2517 grade beam Cluster 55,
BC4
NA Division 04 12-Nov-2017 13-Nov-2017 10:30 AM 13-Nov-2017 A Approved Closed
BC4
Concrete sampling, testing and placement inspection for Rc Footing Cluster 70,
2521 KHEP-CI-2521
Cluster 70, BC4 BC4
NA Division 03 12-Nov-2017 13-Nov-2017 9:00 AM 14-Nov-2017 A Approved Closed
Installation of reinforced steel bar, embedded item & form closure Cluster 49,
2531 KHEP-CI-2531
inspection for RC Column Neck Cluster 49, BC6 BC6
NA Division 03 13-Nov-2017 14-Nov-2017 9:00 AM 15-Nov-2017 A Approved Closed
Termite control surface preparation, installation and final inspection Cluster 21,
2538 KHEP-CI-2538
for Grade Beam Cluster 21, BC4 BC4
NA Division 03 13-Nov-2017 14-Nov-2017 9:00 AM 14-Nov-2017 A Approved Closed
Inspection of Sand filling Around pipe main line Dia 200mm Zone Approved w/
2544 KHEP-CI-2544
4B, Line 1, MH-22-L01 to MH-21-L01
Line 1 Zone 4B Division 31 13-Nov-2017 14-Nov-2017 11:00 AM 15-Nov-2017 B comments
Closed
Compaction Test Around Footing General Fill (Final Layer) Zone Cluster 23,
2545 KHEP-CI-2545
1B, Cluster 23, BC4 BC4
Zone 1B Division 31 13-Nov-2017 14-Nov-2017 10:30 AM 15-Nov-2017 A Approved Closed
Compaction test (First Layer - pre final layer) for Back Filling of under
2553 KHEP-CI-2553 slab on Grade axis (A-C) Villa (1) and axis (J-N), Villa (5 & 6) Cluster 01 A6 NA Division 03 13-Nov-2017 14-Nov-2017 10:00 AM 20-Nov-2017 A Approved Closed
Cluster 1, A6
Cast in place concrete formwork inspection for Column First Floor Approved w/
2568 KHEP-CI-2568
Cluster 8, B2
Cluster 8, B2 NA Division 03 14-Nov-2017 15-Nov-2017 10:00 AM 16-Nov-2017 B comments
Closed
Cast in place concrete formwork inspection for Rc Stair First Flight Approved w/
2588 KHEP-CI-2588
Cluster 73, B2
Cluster 73, B2 NA Division 03 16-Nov-2017 18-Nov-2017 9:30 AM 19-Nov-2017 B comments
Closed
Cast in place concrete formwork inspection for Rc Column Neck Cluster 49, Approved w/
2590 KHEP-CI-2590
Cluster 49, BC6 BC6
NA Division 03 16-Nov-2017 18-Nov-2017 10:30 AM 19-Nov-2017 B comments
Closed
Second Coat, Damproofing installation Inspection for RC Footing &
Cluster 79,
2591 KHEP-CI-2591 Column Neck
BC4
NA Division 07 16-Nov-2017 18-Nov-2017 2:00 PM 19-Nov-2017 A Approved Closed
Cluster 79, BC4
Second coat dam proofing installation inspection for CMU, Morter and
Cluster 22,
2592 KHEP-CI-2592 Masonry inspection under exterior reinforced grade beam
BC4
NA Division 07 16-Nov-2017 18-Nov-2017 10:00 AM 19-Nov-2017 A Approved Closed
Cluster 22, BC4
Compaction test Around Footing general fill (Final layer) Cluster 60,
2601 KHEP-CI-2601
Zone 3B, Cluster 60, BC4 BC4
Zone 3B Division 31 16-Nov-2017 18-Nov-2017 1:30 PM 19-Nov-2017 A Approved Closed
Cast in place concrete formwork inspection for Rc Stair First Flight Cluster 9,
2607 KHEP-CI-2607
Cluster 9, BC4 BC4
NA Division 03 18-Nov-2017 19-Nov-2017 10:00 AM 20-Nov-2017 A Approved Closed
Installation of reinforced steel bar, embedded item & form closure Cluster 70,
2612 KHEP-CI-2612
inspection for RC Column Neck Cluster 70, BC4 BC4
NA Division 03 18-Nov-2017 19-Nov-2017 9:30 AM 20-Nov-2017 A Approved Closed
First coat dam proofing installation inspection for CMU, Morter and
Cluster 25,
2618 KHEP-CI-2618 Masonry inspection under exterior reinforced grade beam
BC4
NA Division 07 19-Nov-2017 20-Nov-2017 10:00 AM 22-Nov-2017 A Approved Closed
Cluster 25, BC4
Check the survey work, elevation and coordinate for blinding under
Cluster 24,
2623 KHEP-CI-2623 Grade beam
BC4
NA Division 03 19-Nov-2017 20-Nov-2017 2:00 PM 23-Nov-2017 A Approved Closed
Cluster 24, BC4
Concrete sampling, testing and placement inspection for Rc Stair
2624 KHEP-CI-2624 First Flight Cluster 54, B2 NA Division 03 19-Nov-2017 20-Nov-2017 9:30 AM 22-Nov-2017 A Approved Closed
Cluster 54, B2
Concrete sampling, testing and placement inspection for Rc Grade
Approved w/
2625 KHEP-CI-2625 Beam Cluster 64, Cluster 64, B2 NA Division 03 19-Nov-2017 20-Nov-2017 9:40 AM 22-Nov-2017 B comments
Closed
B2
Concrete sampling, testing and placement inspection for Rc Column
2626 KHEP-CI-2626 First Floor Cluster 75, B2 NA Division 03 19-Nov-2017 20-Nov-2017 9:50 AM 22-Nov-2017 A Approved Closed
Cluster 75, B2
Second Coat, Damproofing installation Inspection for RC Footing &
Cluster 64,
2627 KHEP-CI-2627 Column Neck
A4
NA Division 07 19-Nov-2017 20-Nov-2017 1:30 PM 22-Nov-2017 A Approved Closed
Cluster 64, A4
Check the survey work, elevation and coordinate for blinding under
Cluster 62,
2628 KHEP-CI-2628 Footing Cluster
BC6
NA Division 03 19-Nov-2017 20-Nov-2017 2:30 PM 22-Nov-2017 A Approved Closed
62, BC6
Installation of reinforced steel bar, embedded item & form closure
2629 KHEP-CI-2629 inspection for RC Column (ground Floor) Cluster 64, B2 NA Division 03 19-Nov-2017 20-Nov-2017 2:00 PM 22-Nov-2017 A Approved Closed
Cluster 64, B2
Concrete sampling, testing and placement inspection for Rc Column
2630 KHEP-CI-2630 First Floor Cluster 8, B2 NA Division 03 19-Nov-2017 20-Nov-2017 9:00 AM 22-Nov-2017 A Approved Closed
Cluster 8, B2
Cast in Place Concrete formwork inspection For RC First Floor Slab Approved w/
2635 KHEP-CI-2635
Cluster 48, B2
Cluster 48, B2 NA Division 03 19-Nov-2017 20-Nov-2017 10:30 AM 23-Nov-2017 B comments
Closed
Second coat dam proofing installation inspection for CMU, Morter and
Cluster 25,
2653 KHEP-CI-2653 Masonry inspection under exterior reinforced grade beam
BC4
NA Division 07 22-Nov-2017 23-Nov-2017 10:00 AM 25-Nov-2017 A Approved Closed
Cluster 25, BC4
Compaction test (Second layer) final layer under slab on grade axis
2661 KHEP-CI-2661 (A-E) Cluster 2, Cluster 02 A6 NA Division 03 22-Nov-2017 23-Nov-2017 10:00 AM 25-Nov-2017 A Approved Closed
A6
Installation of reinforcing steel bar embedded item and form closure
2662 KHEP-CI-2662 inspection for RC Column First Floor Cluster 19 B2 NA Division 03 22-Nov-2017 23-Nov-2017 2:00 PM 25-Nov-2017 A Approved Closed
Cluster 19, B2
Cast in place concrete formwork inspection for Grade beam Cluster 43,
2663 KHEP-CI-2663
Cluster 43, A6 A6
NA Division 03 22-Nov-2017 23-Nov-2017 10:00 AM 25-Nov-2017 A Approved Closed
First coat dam proofing installation inspection for CMU, Morter and
Cluster 55,
2686 KHEP-CI-2686 Masonry inspection under exterior reinforced grade beam
BC4
NA Division 07 25-Nov-2017 26-Nov-2017 10:00 AM 27-Nov-2017 A Approved Closed
Cluster 55, BC4
Second coat dam proofing installation inspection for CMU, Morter and
Cluster 55,
2696 KHEP-CI-2696 Masonry inspection under exterior reinforced grade beam
BC4
NA Division 03 26-Nov-2017 27-Nov-2017 9:30 AM 28-Nov-2017 A Approved Closed
Cluster 55, BC4
Damproofing surface preparation for RC Footing & Column Neck Cluster 74,
2697 KHEP-CI-2697
Cluster 74, BC4 BC4
NA Division 07 26-Nov-2017 27-Nov-2017 10:00 AM 28-Nov-2017 E Rejected Closed
Damproofing surface preparation for RC Footing & Column Neck Cluster 74,
2697.1 KHEP-CI-2697-01
Cluster 74, BC4 BC4
NA Division 07 29-Nov-2017 30-Nov-2017 10:00 AM 30-Nov-2017 A Approved Closed
Cast in place concrete form work inspection for RC Column Neck Cluster 70,
2699 KHEP-CI-2699
Cluster 70, BC4 BC4
NA Division 03 26-Nov-2017 27-Nov-2017 10:30 AM 28-Nov-2017 E Rejected Closed
Cast in place concrete form work inspection for RC Column Neck Cluster 70,
2699.1 KHEP-CI-2699-01
Cluster 70, BC4 BC4
NA Division 03 28-Nov-2017 29-Nov-2017 10:30 AM 30-Nov-2017 A Approved Closed
First Coat dam proofing installation inspection for CMU, Morter and
Cluster 37,
2704 KHEP-CI-2704 Masonry inspection under exterior reinforced grade beam
BC4
NA Division 07 26-Nov-2017 27-Nov-2017 2:00 PM 28-Nov-2017 A Approved Closed
Cluster 37, BC4
First Coat dam proofing installation inspection for CMU, Morter and
Cluster 36,
2705 KHEP-CI-2705 Masonry inspection under exterior reinforced grade beam
BC4
NA Division 07 27-Nov-2017 28-Nov-2017 3:00 PM 28-Nov-2017 A Approved Closed
Cluster 36, BC4
Cast in place concrete form work inspection for RC First Floor Slab &
Cluster 6, Approved w/
2706 KHEP-CI-2706 Stair
BC4
NA Division 03 27-Nov-2017 28-Nov-2017 10:00 AM 30-Nov-2017 B comments
Closed
Cluster 6, BC4
Installation of reinforcing steel bar embedded item and form closure
Cluster 6,
2707 KHEP-CI-2707 inspection for RC First Floor Slab & Stair
BC4
NA Division 03 27-Nov-2017 28-Nov-2017 10:00 AM 30-Nov-2017 A Approved Closed
Cluster 6, BC4
Cast in place concrete form work inspection for RC Grade Beam Cluster 21,
2708 KHEP-CI-2708
Cluster 21, BC4 BC4
NA Division 03 27-Nov-2017 28-Nov-2017 10:00 AM 30-Nov-2017 A Approved Closed
Sampling Aggregated sub base materials (saad areemat EST) Jobsite Stock
2732 KHEP-CI-2732
Jobsite Stock pile 17 pile 17
NA Division 03 28-Nov-2017 29-Nov-2017 10:30 AM 30-Nov-2017 E Rejected Closed
Cast in place concrete form work inspection for RC Footing Cluster 62,
2734 KHEP-CI-2734
Cluster 62, BC6 BC6
NA Division 03 29-Nov-2017 30-Nov-2017 9:00 AM 2-Dec-2017 A Approved Closed
Inspection of sand Filling Around pipe Sewer main line Dia 200mm
2741 KHEP-CI-2741 Zone 1B, Line Line 2 Zone 1B Division 31 29-Nov-2017 30-Nov-2017 11:00 AM 2-Dec-2017 A Approved Closed
2, MH-9-L02 and MH-8-L02 and MH-8-L02 and MH-7-L02
Cast in place concrete form work inspection for Column First Floor
2778 KHEP-CI-2778
Cluster 20, B2
Cluster 20 B2 NA Division 03 2-Dec-2017 3-Dec-2017 2:00 PM 4-Dec-2017 A Approved Closed
First Coat dam proofing installation inspection for CMU, Morter and
Cluster 56,
2784 KHEP-CI-2784 Masonry inspection under exterior reinforced grade beam
BC4
NA Division 07 3-Dec-2017 4-Dec-2017 2:00 PM 5-Dec-2017 A Approved Closed
Cluster 56, BC4
Cast in place concrete form work inspection for First Floor Slab &
2785 KHEP-CI-2785 Stair Second Flight Cluster 51, B2 NA Division 03 3-Dec-2017 4-Dec-2017 10:00 AM 5-Dec-2017 A Approved Closed
Cluster 51, B2
Installation of reinforced steel bar, embedded item & form closure
2786 KHEP-CI-2786 inspection for RC First Floor Slab 7 Stair Second Flight Cluster 51, B2 NA Division 03 3-Dec-2017 4-Dec-2017 10:30 AM 5-Dec-2017 A Approved Closed
Cluster 51, B2
Cast in place concrete form work inspection for Rc Column Neck Cluster 47,
2787 KHEP-CI-2787
Cluster 47, BC6 BC6
NA Division 03 3-Dec-2017 4-Dec-2017 2:00 PM 5-Dec-2017 A Approved Closed
Compaction test final layer general fill (Around Footing) Cluster 37,
2788 KHEP-CI-2788
Zone 2B, Cluster 37, BC4 BC4
Zone 2B Division 31 4-Dec-2017 5-Dec-2017 1:30 PM 6-Dec-2017 A Approved Closed
Inspection Formwork and concrete pouring for sewer Back Drop pice
2765.2 KHEP-CI-2765-02 ( From IC to MH Ø 160 mm ) at Manhole Zone 1B Line 33 , 34 MH-1- Line 33 & 34 Zone 1B Division 31 11-Jan-2018 13-Jan-2018 2:30 PM 14-Jan-2018 A Approved Closed
A-L33 & MH-1-A-L34
Inspection From work and pouring of concrete Sewer Backdrop
2789 KHEP-CI-2789 connecting to sewer manholes Zone 1B, Line 2, MH-9-L02 and MH- Line 2 Zone 1B Division 31 17-Jan-2018 18-Jan-2018 1:30 PM 20-Jan-2018 E Rejected Closed
8-L02 and MH-7-L02
Inspection From work and pouring for storm pice at manhole
2790 KHEP-CI-2790 Zone 2B, Line 8 & 9, MH- Zone 2B Line 8 & 9 Division 33 7-Dec-2017 9-Dec-2017 11:00 AM 9-Dec-2017 A Approved Closed
26-L08 (one side) and MH-I25-L09 (two side)
Inspection for Application of Second Coating Bituminous Dam
proofing for Storm manholes (Pre cast yard)
2791 KHEP-CI-2791 Zone 1B, Line 15, MH-47-L15 and MH-48- Line 15 Zone 1B Division 33 4-Dec-2017 5-Dec-2017 1:30 PM 6-Dec-2017 A Approved Closed
L15 and MH-49-L15 and MH-50-L15 and MH-51-L15 and MH-52-
L15
Concrete sampling, testing and placement inspection for RC Footing Cluster 62,
2792 KHEP-CI-2792
Cluster 62, BC6 BC6
NA Division 03 4-Dec-2017 5-Dec-2017 9:30 AM 6-Dec-2017 A Approved Closed
Cast in place concrete form work inspection for Rc Column Neck Cluster 38,
2811 KHEP-CI-2811
Cluster 38, BC6 BC6
NA Division 03 5-Dec-2017 6-Dec-2017 10:00 AM 7-Dec-2017 A Approved Closed
Cast in place concrete form work inspection for Rc Grade Beam Cluster 65,
2825 KHEP-CI-2825
Cluster 65, A6 A6
NA Division 03 6-Dec-2017 7-Dec-2017 10:00 AM 9-Dec-2017 A Approved Closed
Cast in place concrete form work inspection for First Floor Slab &
2842 KHEP-CI-2842 Second Flight Stair Cluster 52, B2 NA Division 03 7-Dec-2017 9-Dec-2017 11:00 AM 11-Dec-2017 A Approved Closed
Cluster 52, B2
Cast in place concrete form work inspection for Rc Grade Beam Cluster 23,
2851 KHEP-CI-2851
Cluster 23, BC4 BC4
NA Division 03 10-Dec-2017 11-Dec-2017 2:00 PM 12-Dec-2017 A Approved Closed
70cm, CMU motor and masonry inspection under exterior reinforced Cluster 40,
2888 KHEP-CI-2888
grade beam Cluster 40, BC4 BC4
NA Division 04 12-Dec-2017 13-Dec-2017 2:00 PM 16-Dec-2017 A Approved Closed
Second coat dam proofing installation inspection for CMU, Morter and
Cluster 42,
2889 KHEP-CI-2889 Masonry inspection under exterior reinforced grade beam
BC4
NA Division 07 12-Dec-2017 13-Dec-2017 10:00 AM 16-Dec-2017 E Rejected Closed
Cluster 42, BC4
Second coat dam proofing installation inspection for CMU, Morter and
Cluster 42,
2889.1 KHEP-CI-2889-01 Masonry inspection under exterior reinforced grade beam
BC4
NA Division 07 18-Dec-2017 19-Dec-2017 10:00 AM 20-Dec-2017 A Approved Closed
Cluster 42, BC4
70cm, CMU motor and masonry inspection under exterior reinforced Cluster 77,
2905 KHEP-CI-2905
grade beam Cluster 77, BC4 BC4
NA Division 03 14-Dec-2017 16-Dec-2017 9:30 AM 18-Dec-2018 A Approved Closed
First coat dam proofing installation inspection for CMU, Morter and
Cluster 41,
2911 KHEP-CI-2911 Masonry inspection under exterior reinforced grade beam
BC4
NA Division 07 16-Dec-2017 17-Dec-2017 10:00 AM 19-Dec-2017 A Approved Closed
Cluster 41, BC4
Concrete sampling, testing and placement inspection for RC Columns Cluster 66,
2914 KHEP-CI-2914
- Ground Floor Cluster 66, A6 A6
NA Division 03 16-Dec-2017 17-Dec-2017 9:30 AM 18-Dec-2017 A Approved Closed
Dam proofing surface preparation for RC column neck & footing Cluster 28,
2927 KHEP-CI-2927
Cluster 28, BC4 BC4
NA Division 07 17-Dec-2017 18-Dec-2017 10:00 AM 19-Dec-2017 A Approved Closed
Installation of reinforcing steel bar embedded item and form closure Cluster
2930 KHEP-CI-2930
inspection for RC column (ground floor) Cluster 23,BC4 23,BC4
NA Division 03 17-Dec-2017 18-Dec-2017 2:00 PM 19-Dec-2017 A Approved Closed
Compaction test around footing general fill 3rd Layer Cluster Cluster 26,
2933 KHEP-CI-2933
26, BC4 - Zone 2B BC4
Zone 2B Division 31 17-Dec-2017 18-Dec-2017 10:30 AM 19-Dec-2017 A Approved Closed
Compaction test around footing general fill 3rd Layer Cluster Cluster 67,
2934 KHEP-CI-2934
67, A4 - Zone 4A A4
Zone 4A Division 31 17-Dec-2017 18-Dec-2017 10:30 AM 20-Dec-2017 A Approved Closed
Compaction test around footing general fill 2nd Layer Cluster Cluster 74,
2935 KHEP-CI-2935
74, BC4 - Zone 4B BC4
Zone 4B Division 31 17-Dec-2017 18-Dec-2017 10:30 AM 21-Dec-2017 A Approved Closed
Check the survey work, elevation and cordinate for blinding under Cluster 45,
2936 KHEP-CI-2936
gread beam Cluster 45, A6 A6
NA Division 1 17-Dec-2017 18-Dec-2017 9:30 AM 19-Dec-2017 A Approved Closed
Check the survey work, elevation and cordinate for blinding under Cluster 46,
2937 KHEP-CI-2937
gread beam Cluster 46, A6 A6
NA Division 1 17-Dec-2017 18-Dec-2017 9:45 AM 19-Dec-2017 A Approved Closed
Installation of reinforcing steel bar embedded item and form closure Cluster 22,
2944 KHEP-CI- 2944
inspection for RC grade beam BC4
NA Division 03 18-Dec-2017 19-Dec-2017 10:00 AM 21-Dec-2017 A Approved Closed
Second coat dam proofing installation inspection for CMU, mortar Cluster 41,
2946 KHEP-CI- 2946
and masonry inspection under exterior reinforced GB Cluster 41, BC4 BC4
NA Division 07 18-Dec-2017 19-Dec-2017 10:00 AM 20-Dec-2017 A Approved Closed
Check the survey work, elevation and cordinate for blinding under
Cluster 56,
2953 KHEP-CI- 2953 gread beam Cluster
BC4
NA Division 01 18-Dec-2017 19-Dec-2017 2:00 PM 21-Dec-2017 A Approved Closed
56, BC4
Inspection for gravel filling around pipe sewer main line Dia 200mm Approved w/
2956 KHEP-CI- 2956
Zone 1B,Line 02
Line 02 Zone 1B Division 31 18-Dec-2017 19-Dec-2017 11:00 AM 21-Dec-2017 B comments
Closed
Inspection for gravel filling above pipe pipe trench with geotextile
protection sheet and laying warning tape sewer main line Dia 200mm Approved w/
2957 KHEP-CI- 2957
Zone 1B,Line 01 MH-8-L01 to MH-7-
Line 01 Zone 1B Division 31 18-Dec-2017 19-Dec-2017 11:00 AM 21-Dec-2017 B comments
Closed
L01 , MH-7-L01 to MH-6-L01
Compaction test of sand filling up to the pipe 1st layer around
2958 KHEP-CI- 2958 manhole - sewer main line Zone 1B ,Line 6,7 & 8 MH-4-L08 & MH-3- Line 6,7 & 8 Zone 1B Division 31 18-Dec-2017 19-Dec-2017 11:00 AM 23-Dec-2017 A Approved Closed
L08 -MH-2-L08 - MH-1-L-07 - MH-1-L06
Inspection Formwork and concrete pouring for sewer embedded pice
at manhole Zone 1B Line 1,2 MH-5-L02 and MH-
2959 KHEP-CI- 2959
3-L02 one side MH-5-A-L02 and MH-4-L02 and MH-7-L01 two side
Line 1,2 Zone 1B Division 31 18-Dec-2017 19-Dec-2017 2:30 PM 21-Dec-2017 E Rejected Closed
MH-8-L01 and MH-6-L01
Inspection Formwork and concrete pouring for sewer embedded pice
at manhole Zone 1B Line 1,2 MH-5-L02 and MH-
2959.1 KHEP-CI- 2959-01
3-L02 one side MH-5-A-L02 and MH-4-L02 and MH-7-L01 two side
Line 1,2 Zone 1B Division 31 26-Dec-2017 27-Dec-2017 2:30 AM 30-Dec-2017 E Rejected Closed
MH-8-L01 and MH-6-L01
Concrete Sampling Testing & Placement Inspection for RC Slab on
2920 KHEP-CI-2920
Grade Axis A-E Cluster 1 A6
Cluster 01 A6 NA Division 3 11-Jan-2018 13-Jan-2018 9:00 AM 14-Jan-2018 A Approved Closed
Cast in place concrete formwork inspection for RC Column Ground Cluster 66,
2966 KHEP-CI- 2966
floor Cluster 66, A6 A6
NA Division 03 19-Dec-2017 20-Dec-2017 11:00 AM 21-Dec-2017 A Approved Closed
Box Closing & Grouting for storm embedded pice at Manhole Zone
2B, Line 01,04,21 MH-1-L01 three side & MH-I10-L04 two side MH-1-
2967 KHEP-CI- 2967
L01 & MH-2-L01 & MH-I13-L04 one side MH-77-L21 one side & MH-
Line 01,04,2 Zone 2B Division 33 19-Dec-2017 20-Dec-2017 10:30 AM 23-Dec-2017 A Approved Closed
78-L21 two side
Compaction test Around Footing general fill (4th layer) Cluster 79,
2968 KHEP-CI-2968
Zone 4B, Cluster 79, BC4 BC4
Zone 4B Division 31 19-Dec-2017 20-Dec-2017 10:30 AM 23-Dec-2017 A Approved Closed
Compaction test Around Footing general fill (4th layer) Cluster 70,
2969 KHEP-CI-2969
Zone 4B, Cluster 70, BC4 BC4
Zone 4B Division 31 19-Dec-2017 20-Dec-2017 11:30 AM 23-Dec-2017 A Approved Closed
Compation test Around Footing general fill (4th layer) Cluster 41,
2971 KHEP-CI-2971
Zone 2B, Cluster 41, BC4 BC4
Zone 2B Division 31 20-Dec-2017 21-Dec-2017 2:30 PM 24-Dec-2017 A Approved Closed
Compaction test Around Footing general fill (4th layer) Cluster 42,
2972 KHEP-CI-2972
Zone 2B, Cluster 42, BC4 BC4
Zone 2B Division 31 20-Dec-2017 21-Dec-2017 2:30 PM 24-Dec-2017 A Approved Closed
Cast In Place Concrete Formwork Inspection for RC Column Neck Cluster 62, Approved w/
2978 KHEP-CI-2978
Cluster 62, BC6 BC6
NA Division 03 20-Dec-2017 21-Dec-2017 10:30 AM 24-Dec-2017 B comments
Closed
Cast In Place Concrete Formwork Inspection for RC Grade Beams Cluster 50,
2988 KHEP-CI-2988
Cluster 50, BC4 BC4
NA Division 03 21-Dec-2017 23-Dec-2017 2:00 PM 25-Dec-2017 A Approved Closed
Installation of Rainforcing steel bar Embedded item and Closure Cluster 50,
2989 KHEP-CI-2989
Inspection for RC Grade Beam Cluster 50, BC4 BC4
NA Division 03 21-Dec-2017 23-Dec-2017 2:30 PM 25-Dec-2017 A Approved Closed
Compaction Test round Footing general dill Final Layer Zone 2B, Cluster 39,
2995 KHEP-CI-2995
Cluster 39, BC6 2nd Layer BC6
Zone 2B Division 31 21-Dec-2017 23-Dec-2017 2:00 AM 25-Dec-2017 A Approved Closed
Inspection of Pre Back Filling for Around Manhole Storm main line
2999 KHEP-CI-2999
Zone 1B, Line 11, MH-I33-L11 to MH-I34-L11
Line 11 Zone 1B Division 31 21-Dec-2017 23-Dec-2017 11:00 AM 25-Dec-2017 A Approved Closed
Inspection Form work for base & wall and concrete Pouring for Storm
Catch Basin (Precast yard) Zone 1B.4B Line 08 CB-126 at MH-26-L08
3000 KHEP-CI-3000 and CB-128&CB-129 at MH-21-L08 CB-120&CB-121 at MH-26A-L08 Line 08 Zone 1B.4B Division 33 21-Dec-2017 23-Dec-2017 2:30 PM 25-Dec-2017 E Rejected Closed
and CB-103&CB-104 at MH-46-L15 CB-110&CB-111&CB-122&CB-113
at MH-27-L07 and CB-114 at MH-28-L07
Inspection Form work for base & wall and concrete Pouring for Storm
Catch Basin (Precast yard) Zone 1B.4B Line 08 CB-126 at MH-26-L08
3000.1 KHEP-CI-3000-01 and CB-128&CB-129 at MH-21-L08 CB-120&CB-121 at MH-26A-L08 Line 08 Zone 1B.4B Division 33 26-Dec-2017 27-Dec-2017 10:30 AM 30-Dec-2017 A Approved Closed
and CB-103&CB-104 at MH-46-L15 CB-110&CB-111&CB-122&CB-113
at MH-27-L07 and CB-114 at MH-28-L07
Cast In Place Concrete Form work Inspection for RC Column first Approved w/
3001 KHEP-CI-3001
floor Cluster 27, B2
Cluster 27, B2 NA Division 03 21-Dec-2017 23-Dec-2017 10:00 AM 24-Dec-2017 B comments
Closed
Check The Survey work elevation and Coodinate for blinding under Cluster 25,
3002 KHEP-CI-3002
Grade Beam Cluster 25, BC4 BC4
NA Division 03 21-Dec-2017 23-Dec-2017 2:00 AM 24-Dec-2017 A Approved Closed
Compaction test around footing general fill 2nd Layer Cluster Cluster 70,
3003 KHEP-CI-3003
70, BC4 - Zone 4B BC4
Zone 4B Division 31 23-Dec-2017 24-Dec-2017 11:00 AM 25-Dec-2017 A Approved Closed
Installation of Rainforcing steel bar Embedded item and form Closure Cluster 9,
3004 KHEP-CI-3004
Inspection for RC Column First floor Cluster 9, BC4 BC4
NA Division 03 23-Dec-2017 24-Dec-2017 2:00 PM 25-Dec-2017 A Approved Closed
70cm CMU Morter and Masonry Inspection Under Exterior Reinforced Cluster 26
3007 KHEP-CI-3007
Grade Beam Cluster 26 BC4 BC4
NA Division 03 23-Dec-2017 24-Dec-2017 2:00 PM 25-Dec-2017 A Approved Closed
Compaction test of Sand filling above the pipe 2nd Layer & laying
3008 KHEP-CI-3008 warning tape around Manhole Sewer Main Line Zone 1B Line 6,7,8 Line 6,7,8 Zone 1B Division 31 23-Dec-2017 24-Dec-2017 11:00 AM 25-Dec-2017 A Approved Closed
MH-4-L08 & MH-3-L08 MH-2-L08 MH-1-L07 MH-1-L06
Concrete Sampling Testing and Placement Inspection For RC Inside Cluster 66,
3011.1 KHEP-CI-3011-01
Coverage of Grid Lines1-6 & A-H Column Ground Floor Cluster 66, A6 A6
NA Division 03 26-Dec-2017 27-Dec-2017 9:30 AM 28-Dec-2017 A Approved Closed
First Coat Dam Proofing Installation Inspection for CMU Moter and
Cluster 77,
3012 KHEP-CI-3012 Masonary Inspection Under Exterior Reinforced Grade Beam Cluster
BC4
NA Division 07 23-Dec-2017 24-Dec-2017 10:00 AM 25-Dec-2017 A Approved Closed
77, BC4
Installation of Rainforcing steel bar Embedded item and form Closure
3013 KHEP-CI-3013
Inspection for RC Column First floor Cluster 58, B2
Cluster 58, B2 NA Division 07 23-Dec-2017 24-Dec-2017 2:00 PM 25-Dec-2017 A Approved Closed
Second coat dam proofing installation inspection for CMU, mortar Cluster 40,
3014 KHEP-CI-3014
and masonry inspection under exterior reinforced GB Cluster 40, BC4 BC4
NA Division 07 23-Dec-2017 24-Dec-2017 10:00 AM 25-Dec-2017 A Approved Closed
First Coat Damp Roofing Installation Inspection for Grade Beam From
3017 KHEP-CI-3017
Inside Cluster 07 B2
Cluster 07 B2 NA Division 07 23-Dec-2017 24-Dec-2017 10:00 AM 25-Dec-2017 A Approved Closed
First Coat Damp Roofing Installation Inspection for Grade Beam From
3018 KHEP-CI-3018
Inside Cluster 05 B2
Cluster 05 B2 NA Division 07 23-Dec-2017 24-Dec-2017 10:00 AM 25-Dec-2017 A Approved Closed
Inspection of Pre back filling for Manhole Storm Main Line Zone 1B
3025 KHEP-CI-3025 Line 15 MH-47-L15 MH-48-L15 MH-49-L15 and MH-51-L15 MH-50- Line 15 Zone-1B Division 31 24-Dec-2017 25-Dec-2017 11:00 AM 26-Dec-2017 A Approved Closed
L15 and MH-52-L15
Inspection for Excavated formation for pipe Trench sewer main line
Approved w/
3026 KHEP-CI-3026 Dia 200mm MH-7-L02 to MH-MH-6-L02 MH-6-L02 to MH-5-L02 Zone Line 2 Zone1B Division 31 24-Dec-2017 25-Dec-2017 11:30 AM 26-Dec-2017 B comments
Closed
3B ,Line 21
First Coat Bituminnous damp proofing installation inspection for
Line
storm manholes precast yard Zone 1B,4B Line 04,10,13,30,27,26
3027 KHEP-CI-3027
MH-114-L27 MH-116-L26 & MH-30-L04 & MH-107A-L30 MH-332-L10
04,10,13,30,2 Zone 1B,4B Division 33 24-Dec-2017 25-Dec-2017 10:30 AM 26-Dec-2017 A Approved Closed
7,26
& MH-59-L13 & MH-107-L30
Installation of reinforcing steel bar ,embedded item and form closure Cluster 32
3032 KHEP-CI-3032
inspection for RC footing Cluster 32 BC6 BC6
NA Division 03 24-Dec-2017 25-Dec-2017 10:00 AM 26-Dec-2017 A Approved Closed
Compaction test around footing general fill 5th Layer Cluster Cluster 41,
3035 KHEP-CI-3035
41, BC4 - Zone 2B BC4
Zone 2B Division 31 25-Dec-2017 26-Dec-2017 2:00 AM 27-Dec-2017 A Approved Closed
Compaction test around footing general fill 5th Layer Cluster Cluster 42,
3036 KHEP-CI-3036
42, BC4 - Zone 2B BC4
Zone 2B Division 31 25-Dec-2017 26-Dec-2017 2:00 AM 27-Dec-2017 A Approved Closed
Compaction test 1st & final Layer Structural fill Cluster 57, BC4 - Cluster 57,
3037 KHEP-CI-3037
Zone 3B BC4
Zone 3B Division 31 25-Dec-2017 26-Dec-2017 2:00 AM 27-Dec-2017 A Approved Closed
First Coat Dam proofing Installation Inspection for footing & Column Cluster 28
3040 KHEP-CI-3040
Neck Cluster 28 BC4 BC4
NA Division 07 25-Dec-2017 26-Dec-2017 10:00 AM 27-Dec-2017 A Approved Closed
First Coat Damp Roofing Installation Inspection for footing & Column Cluster 28
3041 KHEP-CI-3041
Neck Cluster 28 BC4 BC4
NA Division 07 25-Dec-2017 26-Dec-2017 10:00 AM 27-Dec-2017 A Approved Closed
Cast In Place Concrete Form work Inspection for RC Stair First Floor
3047 KHEP-CI-3047
Ground Floor Cluster 64 B2
Cluster 64 B2 NA Division 03 25-Dec-2017 26-Dec-2017 10:00 AM 27-Dec-2017 A Approved Closed
First Coat Dam proofing Installation Inspection for RC Footing & Cluster 47
3057 KHEP-CI-3057
Cloumn Neck Cluster 47 BC6 BC6
NA Division 07 26-Dec-2017 27-Dec-2017 11:00 AM 28-Dec-2017 A Approved Closed
70cm CMU Morter and Masonry Inspection Under Exterior Reinforced Cluster 76
3058 KHEP-CI-3058
Grade Beam Cluster 76 BC4 BC4
NA Division 03 26-Dec-2017 27-Dec-2017 10:00 AM 28-Dec-2017 A Approved Closed
70cm CMU Morter and Masonry Inspection Under Exterior Reinforced Cluster 74
3059 KHEP-CI-3059
Grade Beam Cluster 74 BC4 BC4
NA Division 03 26-Dec-2017 27-Dec-2017 10:30 AM 28-Dec-2017 A Approved Closed
70cm CMU Morter and Masonry Inspection Under Exterior Reinforced Cluster 79
3060 KHEP-CI-3060
Grade Beam Cluster 79 BC4 BC4
NA Division 03 26-Dec-2017 27-Dec-2017 10:35 AM 28-Dec-2017 A Approved Closed
Installation of Reinfocing Steel Bar Embedded item & Form Closure Cluster 53
3063 KHEP-CI-3063
Inspection for RC Footing Foundation Cluster 53 BC6 BC6
NA Division 03 26-Dec-2017 27-Dec-2017 3:00 AM 30-Dec-2017 A Approved Closed
Cast in place concrete form work inspection for RC column first floor
3065 KHEP-CI-3065
Cluster 33 B2
Cluster 33 B2 NA Division 07 26-Dec-2017 27-Dec-2017 2:30 PM 30-Dec-2017 A Approved Closed
Cast in place concrete form work inspection for RC column first floor
3066 KHEP-CI-3066
Cluster 6 BC4
Cluster 6 BC4 NA Division 07 26-Dec-2017 27-Dec-2017 2:30 PM 30-Dec-2017 A Approved Closed
Dam proofing Surface Preparation for RC Footing & Column Neck Cluster 29
3067 KHEP-CI-3067
Cluster 29 BC4 BC4
NA Division 07 26-Dec-2017 27-Dec-2017 10:00 AM 28-Dec-2017 A Approved Closed
Cast in place concrete form work inspection for RC Roof Slab Cluster
3068 KHEP-CI-3068
20 B2
Cluster 20 B2 NA Division 03 26-Dec-2017 27-Dec-2017 10:30 AM 31-Dec-2017 E Rejected Closed
Cast in place concrete form work inspection for RC Roof Slab Cluster
3068.1 KHEP-CI-3068-01
20 B2
Cluster 20 B2 NA Division 03 14-Jan-2018 15-Jan-2018 9:00 AM 16-Jan-2018 A Approved Closed
Second Coat Dam proofing Installation Inspection for Footing & Cluster 28
3070 KHEP-CI-3070
Column Neck Cluster 28 BC4 BC4
NA Division 07 26-Dec-2017 27-Dec-2017 10:00 AM 30-Dec-2017 A Approved Closed
Compaction Test Around Footing general fill 3rd Layer Zone 4B Cluster 70 Approved w/
3074 KHEP-CI-3074
Cluster 70 BC4 BC4
Zone 4B Division 31 26-Dec-2017 27-Dec-2017 2:00 PM 31-Dec-2017 B comments
Closed
Installation of Sewer GRP Manholes Sewer mani line Zone 4B, Line 1
3077 KHEP-CI-3077
MH-21-L01& MH-16-L01 MH-19-L01 & MH-18-L01 & MH-17L01
Line 1 Zone 4B Division 31 27-Dec-2017 28-Dec-2017 10:30 AM 30-Dec-2017 A Approved Closed
Concrete Sampling Testing & Placement Inspection for RC Slab on
3078 KHEP-CI-3078
Grade Axis G,N Cluster 1 A6
Cluster 01 A6 NA Division 3 27-Dec-2017 28-Dec-2017 9:00 AM 30-Dec-2017 A Approved Closed
2nd Coat Damp Proofing Installation Inspection for RC Footing & Cluster 47
3082 KHEP-CI-3082
Cloumn Neck Cluster 47 BC6 BC6
NA Division 7 27-Dec-2017 28-Dec-2017 10:30 AM 30-Dec-2017 A Approved Closed
Installation of Rein forcement steel bar Embedded item & Closure Cluster 80 Approved w/
3084 KHEP-CI-3084
Inspection for RC Footing Foundation Cluster 80 BC6 BC6
NA Division 3 27-Dec-2017 28-Dec-2017 11:00 AM 31-Dec-2017 B comments
Closed
Dam Proofing Surface Preparation for RC Footing & RC Cloumn Neck Cluster 49
3085 KHEP-CI-3085
Cluster 49 BC6 BC6
NA Division 7 27-Dec-2017 28-Dec-2017 2:30 AM 30-Dec-2017 A Approved Closed
Compaction test general Fill Around Manhole 1st Layer Sewer main
3089 KHEP-CI-3089 Line Zone 1B Line 6,7,8 MH-4-L08 & MH-3-L08 MH-2-L08 MH-1-L07 Line 6,7,8 Zone 1B Division 31 28-Dec-2017 30-Dec-2017 11:00 AM 1-Jan-2018 A Approved Closed
MH-1-L06
Compaction test of Sand Filling above the pipe & laying Warning tape
3090 KHEP-CI-3090
around Manhole Storm Main Line Zone 1B Line 10 MH-I31-L10
Line 10 Zone 1B Division 31 28-Dec-2017 30-Dec-2017 11:00 AM 1-Jan-2018 A Approved Closed
Compaction Test Around Footing General fill 4th layer Zone 2B Cluster 40
3096 KHEP-CI-3096
Cluster 40 BC4 BC4
Zone 2B Division 31 28-Dec-2017 30-Dec-2017 2:30 PM 1-Jan-2018 A Approved Closed
Compaction Test first & Final layer Stuctural fill 4th layer Zone 4B Cluster 70 Approved w/
3097 KHEP-CI-3097
Cluster 70 BC4 BC4
Zone 4B Division 31 28-Dec-2017 30-Dec-2017 2:30 PM 1-Jan-2018 B comments
Closed
Cast In Place concrete Form work Insoection for RC first Floor Slab &
3100 KHEP-CI-3100
Stair Cluster 34 B2
Cluster 34 B2 NA Division 3 28-Dec-2017 30-Dec-2017 10:30 AM 31-Dec-2017 A Approved Closed
Inspection of Pre Back Filling for Around Manhole Storm main Line
3102.1 KHEP-CI-3102-01
Zone 2B Line 8 MH-21-L08 MH-26-L08 MH-26A-L08
Line 8 Zone 2B Division 31 4-Jan-2018 6-Jan-2018 11:00 AM 9-Jan-2018 E Rejected Closed
Cast in place concrete form work inspection for RC Cloumn Ground Cluster 23,
3107 KHEP-CI-3107
Floor Cluster 23, BC4 BC4
NA Division 3 30-Dec-2017 31-Dec-2017 10:30 AM 1-Jan-2018 A Approved Closed
Installation of Reinforcing steel bar Embedded item & form Closure Cluster 22
3108 KHEP-CI-3108
Inspection for RC Column Ground Floor Cluster 22 BC4 BC4
NA Division 3 30-Dec-2017 31-Dec-2017 10:30 AM 1-Jan-2018 A Approved Closed
Check the Servey work Elevation & Coordinate for Blinding under Cluster 42
3110 KHEP-CI-3110
Grade Beam Cluster 42 BC4 BC4
NA Division 3 30-Dec-2017 31-Dec-2017 2:00 PM 1-Jan-2018 A Approved Closed
Cast in place concrete form work inspection for RC Roof Slab Cluster
3111 KHEP-CI-3111
3, A6
Cluster 3, A6 NA Division 3 30-Dec-2017 31-Dec-2017 10:00 AM 1-Jan-2018 A Approved Closed
Cast in place concrete form work inspection for RC Slabs & RC Approved w/
3113 KHEP-CI-3113
Beams Roof Floor Cluster 48, B2
Cluster 48, B2 NA Division 3 30-Dec-2017 31-Dec-2017 11:00 AM 2-Jan-2018 B comments
Closed
Installation of Reinforcing steel bar Embedded item & form Closure Approved w/
3114 KHEP-CI-3114
Inspection for RC RC Slabs & RC Beams Roof Floor Cluster 48, B2
Cluster 48, B2 NA Division 3 30-Dec-2017 31-Dec-2017 11:30 AM 2-Jan-2018 B comments
Closed
3116 KHEP-CI-3116 Compaction Test Around Footing General Fill 5th Layer Cluster 77 Cluster 77 Zone 4B Division 31 30-Dec-2017 31-Dec-2017 2:00 PM 1-Jan-2018 A Approved Closed
Second Coat Dam proofing Installation Inspection for CMU Morter &
Cluster 74
3123 KHEP-CI-3123 Masonry Inspection Under Exterior Reinforced Grade Beam Cluster
BC4
NA Division 7 31-Dec-2017 1-Jan-2018 10:30 AM 2-Jan-2018 A Approved Closed
74 BC4
First Coat Dam proofing Installation Inspection for CMU Morter &
Cluster 76
3124 KHEP-CI-3124 Masonary Inspection Under Exterior Reinforced Grade Beam Cluster
BC4
NA Division 7 31-Dec-2017 1-Jan-2018 10:40 AM 2-Jan-2018 A Approved Closed
76 BC4
Concrete Sampling Testing & Placement Inspection for RC Footing Cluster 80 Approved w/
3125 KHEP-CI-3125
Cluster 80 BC6 BC6
NA Division 3 31-Dec-2017 1-Jan-2018 9:30 AM 2-Jan-2018 B comments
Closed
Concrete Sampling Testing & Placement Inspection for RC Footing Cluster 53 Approved w/
3127 KHEP-CI-3127
Cluster 53 BC6 BC6
NA Division 3 31-Dec-2017 1-Jan-2018 9:30 AM 2-Jan-2018 B comments
Closed
Compaction Test General fill Around Manhole 1st layer Strom Main
3129 KHEP-CI-3129
Line Zone 1B Line 10 MH-I31-L10
Line 10 Zone 1B Division 31 31-Dec-2017 1-Jan-2018 11:00 AM 2-Jan-2018 A Approved Closed
Cast In Place Concrete Form Work Inspection for RC Grade Beam Cluster 24
3130 KHEP-CI-3130
Cluster 24 BC4 BC4
NA Division 3 31-Dec-2017 1-Jan-2018 10:30 AM 2-Jan-2018 A Approved Closed
Installation of Reinforcing steel bar Embedded item & form Closure Cluster 24
3131 KHEP-CI-3131
Inspection for RC Grade Beam Cluster 24 BC4 BC4
NA Division 3 31-Dec-2017 1-Jan-2018 10:30 AM 2-Jan-2018 A Approved Closed
Compaction test general fill Around Manhole 2nd layer Sewer main
3132 KHEP-CI-3132
line Zone 1B Line 6,7,8 MH-4-L08 & MH-3-L08 MH-1-L06 MH-1-L07
Line 6,7,8 Zone 1B Division 31 31-Dec-2017 1-Jan-2018 11:00 AM 2-Jan-2018 A Approved Closed
Concrete Sampling Testing & Placement Inspection for RC First Floor Approved w/
3138 KHEP-CI-3138
Slab & Stair Cluster 34 B2
Cluster 34 B2 NA Division 3 1-Jan-2018 2-Jan-2018 9:00 AM 3-Jan-2018 B comments
Closed
Cast In Place Concrete Form Work Inspection for RC First Floor Slab Approved w/
3140 KHEP-CI-3140
& Stair Cluster 35 B2
Cluster 35 B2 NA Division 3 1-Jan-2018 2-Jan-2018 10:30 AM 4-Jan-2018 B comments
Closed
Installation of Reinforcing steel bar Embedded item & form Closure Approved w/
3141 KHEP-CI-3141
Inspection for RC First Floor Slab & Stair Cluster 35 B2
Cluster 35 B2 NA Division 3 1-Jan-2018 2-Jan-2018 10:30 AM 4-Jan-2018 B comments
Closed
Installation of Reinforcing steel bar Embedded item & form Closure Cluster 32 Approved w/
3142 KHEP-CI-3142
Inspection for RC Column Neck Cluster 32 BC6 BC6
NA Division 3 1-Jan-2018 2-Jan-2018 10:00 AM 4-Jan-2018 B comments
Closed
First Coat Dam proofing Installation Inspection for CMU Morter &
Cluster 79
3143 KHEP-CI-3143 Masonary Inspection Under Exterior Reinforced Grade Beam Cluster
BC4
NA Division 7 1-Jan-2018 2-Jan-2018 9:30 AM 3-Jan-2018 A Approved Closed
79 BC4
Second Coat Dam proofing Installation Inspection for CMU Morter &
Cluster 76
3144 KHEP-CI-3144 Masonary Inspection Under Exterior Reinforced Grade Beam Cluster
BC4
NA Division 7 1-Jan-2018 2-Jan-2018 9:35 AM 10-Jan-2018 A Approved Closed
76 BC4
Dam Proofing Surface Preparation for RC Grade Beams Internal Face
3145 KHEP-CI-3145
Only Inside the Building Cluster 68 B2
Cluster 68 B2 NA Division 7 1-Jan-2018 2-Jan-2018 9:40 AM 3-Jan-2018 A Approved Closed
Cast In Place Concrete Form Work Inspection for RC First Floor Slab Approved w/
3147 KHEP-CI-3147
& Stair Cluster 81 A6
Cluster 81 A6 NA Division 3 1-Jan-2018 2-Jan-2018 10:00 AM 4-Jan-2018 B comments
Closed
Installation of Reinforcing steel bar Embedded item & form Closure Approved w/
3148 KHEP-CI-3148
Inspection for RC First Floor Slab & Stair Ground Floor Cluster 81 A6
Cluster 81 A6 NA Division 3 1-Jan-2018 2-Jan-2018 10:30 AM 4-Jan-2018 B comments
Closed
Compaction test around footing general fill final layer Zone 2B, Cluster 40
3150 KHEP-CI-3150
Cluster 40 BC4 BC4
Zone 2B Division 31 1-Jan-2018 2-Jan-2018 2:00 AM 3-Jan-2018 A Approved Closed
Compaction test around footing general fill First layer Zone 2B, Cluster 28
3151 KHEP-CI-3151
Cluster 28 BC4 BC4
Zone 2B Division 31 1-Jan-2018 2-Jan-2018 2:00 AM 3-Jan-2018 A Approved Closed
Cast In Place Concrete Form Work Inspection for RC Columns Cluster 60 Approved w/
3156 KHEP-CI-3156
Ground Floor Cluster 60 BC4 BC4
NA Division 3 1-Jan-2018 2-Jan-2018 11:00 AM 4-Jan-2018 B comments
Closed
Second Coat Dam proofing Installation Inspection for CMU Morter &
Cluster 26
3157 KHEP-CI-3157 Masonary Inspection Under Exterior Reinforced Grade Beam Cluster
BC4
NA Division 7 1-Jan-2018 2-Jan-2018 10:00 AM 3-Jan-2018 A Approved Closed
26 BC4
First Coat Dam Proofing Installation Inspection for Footing & Column Cluster 29
3158 KHEP-CI-3158
Neck Cluster 29 BC4 BC4
NA Division 7 1-Jan-2018 2-Jan-2018 10:00 AM 3-Jan-2018 A Approved Closed
Cast In Place Concrete Form Work Inspection for RCSlab On Grade Approved w/
3159 KHEP-CI-3159
Axis J-N Cluster 2 A6
Cluster 02 A6 NA Division 3 1-Jan-2018 2-Jan-2018 10:30 AM 3-Jan-2018 B comments
Closed
Surface Preparation for RC Column Ground Floor B6 for Closing Site Cluster 21
3161 KHEP-CI-3161
Instruction SI-CI-002 Cluster 21 BC4 BC4
NA Division 7 1-Jan-2018 2-Jan-2018 10:00 AM 4-Jan-2018 A Approved Closed
Second Coat Dam proofing Installation Inspection for CMU Morter &
Cluster 79
3162 KHEP-CI-3162 Masonary Inspection Under Exterior Reinforced Grade Beam Cluster
BC4
NA Division 7 2-Jan-2018 3-Jan-2018 10:00 AM 4-Jan-2018 A Approved Closed
79 BC4
First Coat Dam proofing Installation Inspection for CMU Morter &
3163 KHEP-CI-3163 Masonary Inspection Under Exterior Reinforced Grade Beam Cluster Cluster 67 A4 NA Division 7 2-Jan-2018 3-Jan-2018 10:15 AM 4-Jan-2018 A Approved Closed
67 A4
70cm CMU Morter & Masonry Insoection Under Exterior Reinforced Cluster 70
3164 KHEP-CI-3164
Grade Beam Cluster 70 BC4 BC4
NA Division 3 2-Jan-2018 3-Jan-2018 11:00 AM 4-Jan-2018 A Approved Closed
First Coat Dam proofing Installation Inspection for CMU Morter &
Cluster 78
3165 KHEP-CI-3165 Masonary Inspection Under Exterior Reinforced Grade Beam Cluster
BC4
NA Division 7 2-Jan-2018 3-Jan-2018 11:00 AM 4-Jan-2018 A Approved Closed
78 BC4
Inspection Form Work & concrete Pouring for sewer Embedded Pice
3166 KHEP-CI-3166 at Manhole Zone 1B Line 8,2 MH-7-L02 & MH-1-L08 one side MH-8- Line 8,2 Zone 1B Division 31 2-Jan-2018 3-Jan-2018 2:30 AM 4-Jan-2018 A Approved Closed
L02 two side
Inspection Form Work & concrete Pouring for sewer Back Drop From
3167 KHEP-CI-3167 IC to MH 160mm at Manhole second stage Zone 1B Line 2 MH-5-A- Line 2 Zone 1B Division 31 2-Jan-2018 3-Jan-2018 2:30 AM 6-Jan-2018 E Rejected Closed
L02 MH-4-L02 MH-3-L02
Inspection Formwork and concrete pouring for sewer Back Drop pice
3167.1 KHEP-CI-3167-01 ( From IC to MH Ø 160 mm ) at Manhole (second stage) Zone 1B Line 2 Zone 1B Division 31 13-Jan-2018 14-Jan-2018 2:30 AM 16-Jan-2018 E Rejected Closed
Line 2 MH-5-A-L02 MH-4-L02 & MH-3-L02
Inspection Formwork and concrete pouring for sewer Back Drop pice
Approved w/
3167.2 KHEP-CI-3167-02 ( From IC to MH Ø 160 mm ) at Manhole (second stage) Zone 1B Line 2 Zone 1B Division 31 17-Jan-2018 18-Jan-2018 1:30 PM 20-Jan-2018 B comments
Closed
Line 2 MH-5-A-L02 MH-4-L02 & MH-3-L02
Inspection Form Work & concrete Pouring for sewer Back Drop From
3168 KHEP-CI-3168
IC to MH 160mm at Manhole Zone 1B Line 1 MH-7-L01
Line 1 Zone 1B Division 31 2-Jan-2018 3-Jan-2018 2:30 AM 6-Jan-2018 E Rejected Closed
Compaction test around footing general fill final layer Zone 4B, Cluster 77
3169 KHEP-CI-3169
Cluster 77 BC4 BC4
Zone 4B Division 31 2-Jan-2018 3-Jan-2018 2:00 AM 4-Jan-2018 A Approved Closed
Compaction test general fill Around Manhole 2nd Layer Zone 1B Line
3171 KHEP-CI-3171
10 MH-I31-L10
Line 10 Zone 1B Division 31 2-Jan-2018 3-Jan-2018 11:00 AM 4-Jan-2018 A Approved Closed
Compaction test general fill Around Manhole 3rd Layer Zone 1B Line
3172 KHEP-CI-3172
6,7 & 8 MH-4-L08 MH-3-L08 MH-1-L08 MH-1-L07
Line 6,7 & 8 Zone 1B Division 31 2-Jan-2018 3-Jan-2018 11:00 AM 4-Jan-2018 A Approved Closed
Compaction test general fill Around Manhole 1nd Layer Zone 1B Line
3173 KHEP-CI-3173
6,7 & 8 MH-2-L08
Line 6,7 & 8 Zone 1B Division 31 2-Jan-2018 3-Jan-2018 11:00 AM 4-Jan-2018 A Approved Closed
Cast In Place Concrete Form Work Inspection for RC Grade Beam Cluster 37
3179 KHEP-CI-3179
Cluster 37 BC4 BC4
NA Division 03 3-Jan-2018 4-Jan-2018 10:30 AM 6-Jan-2018 A Approved Closed
Installation of Reinforcing steel bar Embedded item & form Closure Cluster 37
3180 KHEP-CI-3180
Inspection for RC Grade Beam Cluster 37 BC6 BC6
NA Division 03 3-Jan-2018 4-Jan-2018 10:00 AM 7-Jan-2018 A Approved Closed
Form Work & Casting Grout for Column B6 Ground Floor for Closing Cluster 21
3181 KHEP-CI-3181
site Instruction no SI-CI-002 Cluster 21 BC4 BC4
NA Division 03 3-Jan-2018 4-Jan-2018 10:30 AM 6-Jan-2018 A Approved Closed
Compaction Test around Footing General Fill 1st Layer Zone 2B Cluster 47
3184 KHEP-CI-3184
Cluster 47 BC6 BC6
NA Division 03 3-Jan-2018 4-Jan-2018 2:00 AM 7-Jan-2018 A Approved Closed
Compaction Test General Fill Main Line & Around Manhole 1st Layer
3185 KHEP-CI-3185 Storm Main Line Zone 1B Line 15 MH-47-L15 MH-48-L15 MH-94-L15 Line 15 Zone 1B Division 31 3-Jan-2018 4-Jan-2018 11:00 AM 7-Jan-2018 A Approved Closed
MH-50-L15 & MH-51-L15 MH-50-L15 & MH-52-L15
Second Coat Dam proofing Installation Inspection for footing & Cluster 29
3186 KHEP-CI-3186
Column Neck Cluster 29 BC4 BC4
NA Division 07 3-Jan-2018 4-Jan-2018 10:00 AM 6-Jan-2018 A Approved Closed
Second Coat Dam proofing Installation Inspection for CMU Morter &
3187 KHEP-CI-3187 Masonry Inspection Under Exterior Reinforced Grade Beam Cluster Cluster 67 A4 NA Division 07 3-Jan-2018 4-Jan-2018 9:45 AM 6-Jan-2018 A Approved Closed
67 A4
Second Coat Dam proofing Installation Inspection for CMU Morter &
Cluster 78
3188 KHEP-CI-3188 Masonry Inspection Under Exterior Reinforced Grade Beam Cluster
BC4
NA Division 07 3-Jan-2018 4-Jan-2018 10:00 AM 6-Jan-2018 A Approved Closed
78 BC4
Concrete Sampling Testing & Placement Inspection for RC Slab & RC Approved w/
3189 KHEP-CI-3189
Beams Roof Floor Cluster 48 B2
Cluster 48 B2 NA Division 07 3-Jan-2018 4-Jan-2018 10:00 AM 7-Jan-2018 B comments
Closed
Installation of Reinforcing steel bar Embedded item & form Closure Cluster 53
3192 KHEP-CI-3192
Inspection for RC Column Neck Cluster 53 BC6 BC6
NA Division 03 3-Jan-2018 4-Jan-2018 2:00 PM 7-Jan-2018 A Approved Closed
Cast In Place Concrete Form Work Inspection for RC Grade Beam Cluster 55 Approved w/
3193 KHEP-CI-3193
Cluster 55 BC4 BC4
NA Division 03 3-Jan-2018 4-Jan-2018 2:30 PM 7-Jan-2018 B comments
Closed
Installation of Reinforcing steel bar Embedded item & form Closure Cluster 55
3194 KHEP-CI-3194
Inspection for RC Grade Beams Cluster 55 BC4 BC4
NA Division 03 3-Jan-2018 4-Jan-2018 8:45 AM 7-Jan-2018 A Approved Closed
Installation of Reinforcing steel bar Embedded item & form Closure Cluster 50
3197 KHEP-CI-3197
Inspection for RC Column Ground Floor Cluster 50 BC4 BC4
NA Division 03 3-Jan-2018 4-Jan-2018 11:00 AM 6-Jan-2018 A Approved Closed
Compaction test general fill around Manhole final Layer Sewer Main Approved w/
3205 KHEP-CI-3205
Line MH-4-L08 & MH-3-L08 MH-1-L06 MH-1-L07 Zone 1B Line 6,7,8
Line 6,7,8 Zone 1B Division 31 4-Jan-2018 6-Jan-2018 11:00 AM 8-Jan-2018 B comments
Closed
Compaction test general fill around Manhole 2nd Layer Sewer Main Approved w/
3206 KHEP-CI-3206
Line Zone 1B Line 6,7,8 MH-2-L08
Line 6,7,8 Zone 1B Division 31 4-Jan-2018 6-Jan-2018 11:00 AM 8-Jan-2018 B comments
Closed
Compaction test general fill around Manhole 3rd Layer Storm Main
3207 KHEP-CI-3207 Line 10 Zone 1B Division 31 4-Jan-2018 6-Jan-2018 11:00 AM Open
Line Zone 1B Line 10 MH-I31-L10
Compaction test general fill around Manhole 4th Layer Sewer Main
3208 KHEP-CI-3208
Line Zone 1B Line 2 MH-9-L02 to MH-8-L02 MH-8-L02 to MH-7-L02
Line 2 Zone 1B Division 31 4-Jan-2018 6-Jan-2018 11:00 AM 9-Jan-2018 E Rejected Closed
Compaction test general fill around Manhole 4th Layer Sewer Main
3208.1 KHEP-CI-3208-01
Line Zone 1B Line 2 MH-9-L02 to MH-8-L02 MH-8-L02 to MH-7-L02
Line 2 Zone 1B Division 31 15-Jan-2018 16-Jan-2018 11:00 AM 20-Jan-2018 E Rejected Closed
Compaction test general fill around Manhole 4th Layer Sewer Main Approved w/
3208.2 KHEP-CI-3208-02
Line Zone 1B Line 2 MH-9-L02 to MH-8-L02 MH-8-L02 to MH-7-L02
Line 2 Zone 1B Division 31 28-Jan-2018 29-Jan-2018 11:00 AM 29-Jan-2018 B comments
Closed
Installation of Reinforcing steel bar Embedded item & form Closure Cluster 80
3211 KHEP-CI-3211
Inspection for RC Column Neck Cluster 80 BC6 BC6
NA Division 3 4-Jan-2018 6-Jan-2018 10:30 AM 7-Jan-2018 A Approved Closed
Check The Survey work elevation and Coodinate for blinding under Cluster 77
3212 KHEP-CI-3212
Grade Beam Cluster 77 BC4 BC4
NA Division 1 4-Jan-2018 6-Jan-2018 11:00 AM 8-Jan-2018 A Approved Closed
Installation of Reinforcing steel bar Embedded item & form Closure Approved w/
3213.1 KHEP-CI-3213-01
Inspection for RC Column Ground Floor Cluster 65 A6
Cluster 65 A6 NA Division 3 8-Jan-2018 9-Jan-2018 10:30 AM 10-Jan-2018 B comments
Closed
Compaction Test around Footing general Fill 2nd layer Zone 2B Cluster 28
3215 KHEP-CI-3215
Cluster 28 BC4 BC4
Zone 2B Division 31 6-Jan-2018 7-Jan-2018 2:00 PM 9-Jan-2018 A Approved Closed
Compaction Test around Footing general Fill 4th layer Zone 2B Cluster 26
3216 KHEP-CI-3216
Cluster 26 BC4 BC4
Zone 2B Division 31 6-Jan-2018 7-Jan-2018 2:30 PM 9-Jan-2018 A Approved Closed
Installation of Reinforcing steel bar Embedded item & form Closure Cluster 24
3218 KHEP-CI-3218
Inspection for RC Column Ground Floor Cluster 24 BC4 BC4
NA Division 3 6-Jan-2018 7-Jan-2018 2:00 PM 8-Jan-2018 A Approved Closed
Compaction Test of Sand Filling above the Pipe & Laying Warning
3219 KHEP-CI-3219 tape around Manhole Storm Main Line Zone 2B Line 8 MH-21-L08 Line 8 Zone 2B Division 31 6-Jan-2018 7-Jan-2018 11:00 AM 11-Jan-2018 E Rejected Closed
Mh-26-L08 MH-26a-L08
Installation for Sewer GRP Manholes Sewer Main Line Zone 1B Line 1
3220 KHEP-CI-3220
MH-5-L01
Line 1 Zone 1B Division 31 6-Jan-2018 7-Jan-2018 10:30 AM 9-Jan-2018 A Approved Closed
Dam Proofing Surface Preparation for RC Grade Beam from Inside Approved w/
3221 KHEP-CI-3221
Cluster 19 B2
Cluster 19 B2 NA Division 7 6-Jan-2018 7-Jan-2018 2:00 PM 8-Jan-2018 B comments
Closed
Dam Proofing Surface Preparation for RC Grade Beam from Inside Approved w/
3222 KHEP-CI-3222
Cluster 27 B2
Cluster 27 B2 NA Division 7 6-Jan-2018 7-Jan-2018 2:00 PM 8-Jan-2018 B comments
Closed
Cast In Place Concrete Form Work Inspection for RC Column Neck Cluster 32
3226 KHEP-CI-3226
Cluster 32 BC6 BC6
NA Division 3 7-Jan-2018 8-Jan-2018 1:30 PM 9-Jan-2018 A Approved Closed
Concrete Sampling Testing & Placement Inspection for RC First Floor Approved w/
3227 KHEP-CI-3227
Slab & Stair Cluster 35 B2
Cluster 35 B2 NA Division 3 7-Jan-2018 8-Jan-2018 9:00 AM 9-Jan-2018 B comments
Closed
Cast In Place Concrete Form Work Inspection for RC Column First Approved w/
3229 KHEP-CI-3229
Floor Axis G, N Cluster 4 A6
Cluster 4 A6 NA Division 3 7-Jan-2018 8-Jan-2018 10:00 AM 11-Jan-2018 B comments
Closed
Inspection of Excavated & Compaction for Sewer Manholes Sewer
3230 KHEP-CI-3230 Main Line Zone 2B Line 1 MH-9-L01 MH-10-L01 MH-11-L01 & MH- Line 1 Zone 2B Division 31 7-Jan-2018 8-Jan-2018 11:30 AM 9-Jan-2018 A Approved Closed
12-L01
Compaction Test around Footing General Fill 1st Layer Zone 2B Cluster 29
3231 KHEP-CI-3231
Cluster 29 BC4 BC4
Zone 2B Division 31 7-Jan-2018 8-Jan-2018 2:00 PM 10-Jan-2018 A Approved Closed
Inspection of gravel filling around pipe Sewer main line 200mm Zone
3232 KHEP-CI-3232
1B Line 1 MH-6-L01 to MH-5-L01
Line 1 Zone 1B Division 31 7-Jan-2018 8-Jan-2018 11:00 AM 9-Jan-2018 A Approved Closed
Installation of Reinforcing steel bar Form Work for Base for Sewer
GRP Manholes Precast yard Zone 3B & 4B Line Line
26,13,23,18,16,14,15,24,25 & 19 MH-1-A-L23 & MH-1-A-L26 & MH- 26,13,23,18,1
3233 KHEP-CI-3233
1-L16 - MH-1-L19 & MH-1-A-L25 & MH-1-A-L24 & MH-1-A-L18 - MH- 6,14,15,24,25
Zone 3B & 4B Division 33 7-Jan-2018 8-Jan-2018 1:30 PM 9-Jan-2018 A Approved Closed
1-L24 & MH-1-A-L13 & MH-1-L13 & MH-1-L18 - MH-1-L15 & MH-1-A- & 19
L14 & MH-1-L14 & MH-1-L26
Box Closing & Grouting for Storm Embedded Pice at Manhole Zone
3234 KHEP-CI-3234 2B Line 39,20 MH-136-L39 one side MH-71-L20 two side MH-70-L20 Line 39,20 Zone 2B Division 33 7-Jan-2018 8-Jan-2018 10:30 AM 9-Jan-2018 A Approved Closed
one side
First Coat Dam proofing Installation Inspection for CMU Morter &
Cluster 70
3235 KHEP-CI-3235 Masonry Inspection Under Exterior Reinforced Grade Beam Cluster
BC4
NA Division 7 7-Jan-2018 8-Jan-2018 10:00 AM 9-Jan-2018 A Approved Closed
70 BC4
Cast In Place Concrete Form Work Inspection for RC Slab & RC Approved w/
3236 KHEP-CI-3236
Beams Roof Floor Cluster 51 B2
Cluster 51 B2 NA Division 3 7-Jan-2018 8-Jan-2018 10:00 AM 10-Jan-2018 B comments
Closed
Installation of Reinforcing steel bar Embedded item & form Closure Approved w/
3237 KHEP-CI-3237
Inspection for RC Slab & RC Beams Cluster 51 B2
Cluster 51 B2 NA Division 3 7-Jan-2018 8-Jan-2018 10:15 AM 10-Jan-2018 B comments
Closed
Cast in place concrete form work inspection for RC column neck Cluster 80 Approved w/
3238 KHEP-CI-3238
Cluster 80 BC6 BC6
NA Division 3 8-Jan-2018 9-Jan-2018 10:00 AM 11-Jan-2018 B comments
Closed
First Coat Dam proofing Installation Inspection for RC footing & RC Cluster 49
3241 KHEP-CI-3241
Column Neck Cluster 49 BC6 BC6
NA Division 7 8-Jan-2018 9-Jan-2018 10:30 AM 15-Jan-2018 A Approved Closed
Compaction test 1st & final Layer Structural fill selected fill Cluster Cluster 59
3242 KHEP-CI-3242
59 BC6 - Zone 3B BC6
Zone 3B Division 31 8-Jan-2018 9-Jan-2018 11:00 AM 11-Jan-2018 A Approved Closed
Box Closing & Grounding for storm embedded pice at manhole Zone
3243 KHEP-CI-3243
2B Line 39,20
Line 39,20 Zone 2B Division 33 8-Jan-2018 9-Jan-2018 10:30 AM 11-Jan-2018 A Approved Closed
First Coat Dam Proofing Installation Inspection for Grade Beam From Approved w/
3247 KHEP-CI-3247
Inside Cluster 27 B2
Cluster 27 B2 NA Division 7 9-Jan-2018 10-Jan-2018 10:00 AM 11-Jan-2018 B comments
Closed
First Coat Dam Proofing Installation Inspection for Grade Beam From Approved w/
3248 KHEP-CI-3248
Inside Cluster 19 B2
Cluster 19 B2 NA Division 7 9-Jan-2018 10-Jan-2018 10:00 AM 11-Jan-2018 B comments
Closed
Concrete Sampling testing & placement inspection for RC Column Cluster 32 Approved w/
3249 KHEP-CI-3249
Neck Cluster 32 BC6 BC6
NA Division 3 9-Jan-2018 10-Jan-2018 9:00 AM 11-Jan-2018 B comments
Closed
Second Coat Dam Proofing Installation Inspection for Footing & Cluster 49
3250 KHEP-CI-3250
Column neck Cluster 49 BC6 BC6
NA Division 7 9-Jan-2018 10-Jan-2018 2:00 PM 11-Jan-2018 A Approved Closed
Check the survey work elevation & coordinate for blinding under Cluster 40
3252 KHEP-CI-3252
Grade Beam Cluster 40 BC4 BC4
NA Division 3 9-Jan-2018 10-Jan-2018 2:00 PM 11-Jan-2018 A Approved Closed
Compaction test around footing general fill final layer Zone 2B Cluster 26
3253 KHEP-CI-3253
Cluster 26 BC4 BC4
Zone 2B Division 31 9-Jan-2018 10-Jan-2018 2:00 PM 13-Jan-2018 A Approved Closed
Compaction test around footing general fill 4th layer Zone 2B Cluster Cluster 28
3254 KHEP-CI-3254
28 BC4 BC4
Zone 2B Division 31 9-Jan-2018 10-Jan-2018 2:00 PM 13-Jan-2018 A Approved Closed
Cast in Place concrete Form Work Inspection for RC Slab First Floor
3257 KHEP-CI-3257
& Stair Cluster 72 B2
Cluster 72 B2 NA Division 3 10-Jan-2018 11-Jan-2018 10:00 AM 14-Jan-2018 A Approved Closed
Cast in Place concrete Form Work Inspection for RC Slab First Floor
3259 KHEP-CI-3259
& RC Stair 2nd flight Cluster 54 B2
Cluster 54 B2 NA Division 3 10-Jan-2018 11-Jan-2018 8:30 AM 15-Jan-2018 E Rejected Closed
Cast in Place concrete Form Work Inspection for RC Slab First Floor
3259.1 KHEP-CI-3259-01
& RC Stair 2nd flight Cluster 54 B2
Cluster 54 B2 NA Division 3 15-Jan-2018 16-Jan-2018 9:30 AM 20-Jan-2018 E Rejected Closed
Cast in Place concrete Form Work Inspection for RC Slab First Floor
3259.2 KHEP-CI-3259-02
& RC Stair 2nd flight Cluster 54 B2
Cluster 54 B2 NA Division 3 23-Jan-2018 24-Jan-2018 9:30 AM 24-Jan-2018 A Approved Closed
Installation of Reinforcing steel bar Embedded item & form Closure Approved w/
3260.2 KHEP-CI-3260-02
Inspection for RC Slab First Floor & Stair 2nd flight Cluster 54 B2
Cluster 54 B2 NA Division 3 15-Jan-2018 16-Jan-2018 9:45 AM 23-Jan-2018 B comments
Closed
Cast in Place concrete Form Work Inspection for Footing Foundation Cluster 57
3261 KHEP-CI-3261
Cluster 57 BC4 BC4
NA Division 3 10-Jan-2018 11-Jan-2018 10:30 AM 14-Jan-2018 A Approved Closed
Installation of Reinforcing steel bar Embedded item & form Closure Cluster 57
3262 KHEP-CI-3262
Inspection for Footing Foundation Cluster 57 BC4 BC4
NA Division 3 10-Jan-2018 11-Jan-2018 10:45 AM 14-Jan-2018 A Approved Closed
Compaction test Around footing general fill 5th layer Zone 4B Cluster Cluster 31
3269 KHEP-CI-3269
31 BC4 BC4
Zone 4B Division 31 10-Jan-2018 11-Jan-2018 11:00 AM 13-Jan-2018 A Approved Closed
Cast In Place Concrete form work Inspection for RC Stair first flight Cluster 60
3271 KHEP-CI-3271
Ground Floor Cluster 60 BC4 BC4
NA Division 3 10-Jan-2018 11-Jan-2018 1:30 PM 14-Jan-2018 A Approved Closed
Installation of Reinforcing steel bar Embedded item & form Closure Cluster 60 Approved w/
3272 KHEP-CI-3272
Inspection for RC Stair First Floo rGround Floor Cluster 60 BC4 BC4
NA Division 3 10-Jan-2018 11-Jan-2018 2:00 PM 14-Jan-2018 B comments
Closed
Cast In Place Concrete form work Inspection for RC Columns Ground Cluster 50
3273 KHEP-CI-3273
Floor Cluster 50 BC4 BC4
NA Division 3 10-Jan-2018 11-Jan-2018 2:30 PM 14-Jan-2018 A Approved Closed
Installation of Reinforcing steel bar embedded item & form closure Approved w/
3274 KHEP-CI-3274
Inspection for RC Column first floor Cluster 35 B2
Cluster 35 B2 NA Division 3 11-Jan-2018 13-Jan-2018 10:00 AM 15-Jan-2018 B comments
Closed
Compaction Test General Fill Main Line 3rd Layer Sewer Main Line
3281 KHEP-CI-3281
Zone 1B Line 2 MH-9-L02 to MH-8-L02 MH-8-L02 to MH-7-L02
Line 02 Zone 1B Division 33 11-Jan-2018 13-Jan-2018 11:00 AM 14-Jan-2018 A Approved Closed
Compaction Test General Fill Main Line 1st Layer Sewer Main Line
3282 KHEP-CI-3282
Zone 1B Line 1 MH-8-L01 to MH-7-L01 MH-7-L01 to MH-6-L01
Line 01 Zone 1B Division 31 11-Jan-2018 13-Jan-2018 11:00 AM 15-Jan-2018 A Approved Closed
First Coat Dam Proofing Installation Inspection for Footing & Cloumn
3283 KHEP-CI-3283
Neck Cluster 31 B2
Cluster 31 B2 NA Division 7 13-Jan-2018 14-Jan-2018 10:00 AM 15-Jan-2018 A Approved Closed
Cast In Place Concrete form work Inspection for RC Columns Ground Cluster 22
3284 KHEP-CI-3284
Floor Cluster 22 BC4 BC4
NA Division 3 13-Jan-2018 14-Jan-2018 10:00 AM 16-Jan-2018 E Rejected Closed
Cast In Place Concrete form work Inspection for RC Columns Ground Cluster 22
3284.1 KHEP-CI-3284-01
Floor Cluster 22 BC4 BC4
NA Division 3 17-Jan-2018 18-Jan-2018 10:00 AM 20-Jan-2018 A Approved Closed
Cast In Place Concrete form work Inspection for RC Roof Slab Cluster
3285 KHEP-CI-3285
27 B2
Cluster 27 B2 NA Division 3 13-Jan-2018 14-Jan-2018 10:00 AM 16-Jan-2018 A Approved Closed
Concrete Sampling Testing & Placement Inspection for RC Cloumn Cluster 80 Approved w/
3288 KHEP-CI-3288
Neck Cluster 80 BC6 BC6
NA Division 3 13-Jan-2018 14-Jan-2018 9:30 AM 15-Jan-2018 B comments
Closed
Installation of Reinforcing steel bar embedded item & form Closure Approved w/
3289 KHEP-CI-3289
Inspection for RC Cloumn First Floor Cluster 81 A6
Cluster 81 A6 NA Division 3 13-Jan-2018 14-Jan-2018 2:30 PM 15-Jan-2018 B comments
Closed
Installation for Sewer GRP Manholes -ٍSewer main line Zone 2B Line
3290 KHEP-CI-3290 09,10,11 MH-1-L11 & MH-1-L10 MH-1-A-L10 & MH-1-L09 MH-3-L09 Line 09 Zone 2B Division 31 13-Jan-2018 14-Jan-2018 10:30 AM 15-Jan-2018 A Approved Closed
& MH-2-L09
Second coat, Bituminous damp proofing installation inspection for
3291 KHEP-CI-3291 storm manholes, Zone 4B Line 22 MH-83-L22 MH-84-L22 MH-87-L22 Line 22 Zone 4B Division 33 13-Jan-2018 14-Jan-2018 10:30 AM 15-Jan-2018 A Approved Closed
& MH-88-L22
Inspection Formwork for storm embedded pice at Manhole Zone 2B
&3B Line 07,09,39,20 MH-71-L20 three side & MH-I23-L09 tow side Line
3292 KHEP-CI-3292
MH-70-L20 & MH-136-L39 & MH-I22-L09 one side MH-27-L07 one 07,09,39,20
Zone 2B &3B Division 33 13-Jan-2018 14-Jan-2018 1:30 PM 15-Jan-2018 A Approved Closed
side & MH-20-L07 tow side
Inspection Formwork for base & wall and concrete pouring for Storm
Catch Basin -(Precast yard ) Zone 2B, Line 07,18,01,35 CB-146 At
Line
3293 KHEP-CI-3293 MH-61-L18 & CB-144 &CB-145 At MH-132-L35 And CB-138 At MH-2-
07,18,01,35
Zone 2B Division 33 13-Jan-2018 14-Jan-2018 1:30 PM 15-Jan-2018 A Approved Closed
L01 CB-142 & CB-143 & MH-6-L01 & CB-141 & CB-140 at MH-3-L01
CB-134 & CB-135 At MH-1-L01 & CB-132 & CB-133 at MH-16-L07
Compaction test Around Footing general fill (2nd layer) Zone 2B Cluster 29
3294 KHEP-CI-3294
Cluster 29 BC4 BC4
Zone 2B Division 31 13-Jan-2018 14-Jan-2018 2:00 PM 15-Jan-2018 A Approved Closed
Compaction test Around Footing general fill (1st layer) Zone 3B Cluster 49
3295 KHEP-CI-3295
Cluster 49 BC6 BC6
Zone 3B Division 31 13-Jan-2018 14-Jan-2018 2:00 PM 15-Jan-2018 A Approved Closed
Cast In Place Concrete form work Inspection for RC first floor slab &
3298 KHEP-CI-3298
stair Cluster 30 B2
Cluster 30 B2 NA Division 3 14-Jan-2018 15-Jan-2018 10:00 AM 20-Jan-2018 A Approved Closed
Cast In Place Concrete form work Inspection for RC roof slab Cluster Cluster 16
3300 KHEP-CI-3300
16 BC4 BC4
NA Division 3 14-Jan-2018 15-Jan-2018 2:00 PM 20-Jan-2018 A Approved Closed
Installation of Reinforcing steel bar embedded item & form closure Cluster 16 Approved w/
3301 KHEP-CI-3301
Inspection for RC roof slab Cluster 16 BC4 BC4
NA Division 3 14-Jan-2018 15-Jan-2018 2:00 PM 20-Jan-2018 B comments
Closed
Concrete Sampling Testing & Placement Inspection for RC Slab & RC Approved w/
3302 KHEP-CI-3302
Beams Roof Floor Cluster 51 B2
Cluster 51 B2 NA Division 3 14-Jan-2018 15-Jan-2018 9:30 AM 16-Jan-2018 B comments
Closed
Concrete Sampling Testing & Placement Inspection for RC Column Cluster 50 Approved w/
3303 KHEP-CI-3303
Ground Floor Cluster 50 BC4 BC4
NA Division 3 14-Jan-2018 15-Jan-2018 9:30 AM 16-Jan-2018 B comments
Closed
Concrete Sampling Testing & Placement Inspection for RC Stairs 1st Cluster 60 Approved w/
3304 KHEP-CI-3304
flight & 4 Columns Besides the stair s Ground Floor Cluster 60 BC4 BC4
NA Division 3 14-Jan-2018 15-Jan-2018 9:30 AM 16-Jan-2018 B comments
Closed
Concrete Sampling Testing & Placement Inspection for RC Slab First Approved w/
3305 KHEP-CI-3305
floor & Stair Ground Floor Cluster 72 B2
Cluster 72 B2 NA Division 3 14-Jan-2018 15-Jan-2018 9:30 AM 16-Jan-2018 B comments
Closed
Check the Servey work elevation coodination for Blinding under Cluster 59
3306 KHEP-CI-3306
Footing Cluster 59 BC6 BC6
NA Division 3 14-Jan-2018 15-Jan-2018 10:00 AM 16-Jan-2018 A Approved Closed
Compaction test Around Footing general fill (final layer) Zone 4B Cluster 74
3307 KHEP-CI-3307
Cluster 74 BC4 BC4
Zone 4B Division 31 14-Jan-2018 15-Jan-2018 2:00 PM 20-Jan-2018 A Approved Closed
Compaction test Around Footing general fill (final layer) Zone 4B Cluster 76
3308 KHEP-CI-3308
Cluster 76 BC4 BC4
Zone 4B Division 31 14-Jan-2018 15-Jan-2018 2:00 PM 20-Jan-2018 A Approved Closed
Compaction test Around Footing general fill (final layer) Zone 4B Cluster 79
3309 KHEP-CI-3309
Cluster 79 BC4 BC4
Zone 4B Division 31 14-Jan-2018 15-Jan-2018 2:00 PM 20-Jan-2018 A Approved Closed
Compaction test general fill main line (2nd layer) Sewer main Zone
3310 KHEP-CI-3310
1B Line 1 MH-8-L01 to MH-7-L01 / MH-7-L01 to MH-6-L01
Line 1 Zone 1B Division 31 14-Jan-2018 15-Jan-2018 11:00 AM 20-Jan-2018 A Approved Closed
Inspection of pre back filling for around manhole sewer main line
3312 KHEP-CI-3312 Zone 1B Line 33,34 MH-1-A-L34 MH-1-L34 MH-2-L34 MH-1-A-L33 & Line 33,34 Zone 1B Division 31 14-Jan-2018 15-Jan-2018 11:00 AM 20-Jan-2018 A Approved Closed
MH-1-L33
Installation Inspection of Precast Storm Drainage Manholes Zone 3B
3313 KHEP-CI-3313
Line 20 MH-69-L20 MH-68-L20
Line 20 Zone 3B Division 33 14-Jan-2018 15-Jan-2018 11:00 AM 20-Jan-2018 A Approved Closed
Concrete Sampling Testing & Placement Inspection for RC Footing Cluster 57 Approved w/
3314 KHEP-CI-3314
Foundation Cluster 57 BC4 BC4
NA Division 3 15-Jan-2018 16-Jan-2018 9:30 AM 20-Jan-2018 B comments
Closed
Insoection of Pre back filling for around manhole sewer main line
3316 KHEP-CI-3316
Line 31 Zone 1B MH-1-A-L31 MH-1-L31 MH2-L31 MH-3-L31
Line 31 Zone 1B Division 31 15-Jan-2018 16-Jan-2018 11:00 AM 20-Jan-2018 A Approved Closed
Compaction test around footing general fill 3rd layer Zone 2B Cluster Cluster 29
3318 KHEP-CI-3318
29 BC4 BC4
Zone 2B Division 31 15-Jan-2018 16-Jan-2018 2:00 PM 20-Jan-2018 A Approved Closed
Compaction test around footing general fill 2nd layer Zone 3B Cluster Cluster 49
3319 KHEP-CI-3319
49 BC6 BC6
Zone 3B Division 31 15-Jan-2018 16-Jan-2018 2:00 PM 20-Jan-2018 A Approved Closed
Compaction test around footing general fill 2nd layer Zone 3B Cluster Cluster 47
3320 KHEP-CI-3320
47 BC6 BC6
Zone 3B Division 31 15-Jan-2018 16-Jan-2018 2:00 PM 20-Jan-2018 A Approved Closed
Compaction test first layer for backfilling under slab on grade Cluster
3326 KHEP-CI-3326
14 B2
Cluster 14 B2 NA Division 3 15-Jan-2018 16-Jan-2018 10:00 AM 20-Jan-2018 A Approved Closed
Installation of Reinforceing Steel Bar Embedded Item & Closure Cluster 21 Approved w/
3330 KHEP-CI-3330
Inspection for RC First Floor Slab & Stair Cluster 21 BC4 BC4
NA Division 3 16-Jan-2018 17-Jan-2018 2:00 PM 22-Jan-2018 B comments
Closed
Concrete Sampling testing & Placement Inspection for RC Roof Slab Approved w/
3331 KHEP-CI-3331
Cluster 27 B2
Cluster 27 B2 NA Division 3 16-Jan-2018 17-Jan-2018 9:00 AM 20-Jan-2018 B comments
Closed
Blinding Concrete Sampling testing & Placement Inspection for Grade Cluster 41 Approved w/
3332 KHEP-CI-3332
Beam Cluster 41 BC4 BC4
NA Division 3 16-Jan-2018 17-Jan-2018 10:00 AM 20-Jan-2018 B comments
Closed
Blinding Concrete Sampling testing & Placement Inspection for Grade Cluster 40 Approved w/
3333 KHEP-CI-3333
Beam Cluster 40 BC4 BC4
NA Division 3 16-Jan-2018 17-Jan-2018 10:00 AM 20-Jan-2018 B comments
Closed
Cast In Place Concrete Form Work Inspection for RC Column Necks Cluster 53
3335 KHEP-CI-3335
Cluster 53 BC6 BC6
NA Division 3 18-Jan-2018 20-Jan-2018 9:45 AM 21-Jan-2018 A Approved Closed
Compaction Test General Fill Main Line 3rd Layer Sewer Main Line
3340 KHEP-CI-3340
Zone 1B Line 1 MH-8-L01 MH-7-L01 & MH-7-L01 MH-6-L01
Line 1 Zone 1B Division 31 16-Jan-2018 17-Jan-2018 11:00 AM 20-Jan-2018 A Approved Closed
Compaction test around footing general fill 5th Layer Cluster 78 BC4 Cluster 78
3341 KHEP-CI-3341
Zone 3B BC4
Zone 3B Division 31 16-Jan-2018 17-Jan-2018 2:00 PM 20-Jan-2018 A Approved Closed
Compaction test around footing general fill 5th Layer Cluster 70 BC4 Cluster 70
3342 KHEP-CI-3342
Zone 3B BC4
Zone 3B Division 31 16-Jan-2018 17-Jan-2018 2:00 PM 20-Jan-2018 A Approved Closed
Cast in place concrete form work inspection for RC column first floor
3345 KHEP-CI-3345
Cluster 35 B2
Cluster 35 B2 NA Division 3 17-Jan-2018 18-Jan-2018 10:00 AM 21-Jan-2018 A Approved Closed
Cast in place concrete form work inspection for RC column first floor
3346 KHEP-CI-3346
axis A-F Cluster 4 A6
Cluster 4 A6 NA Division 3 17-Jan-2018 18-Jan-2018 2:00 PM 20-Jan-2018 A Approved Closed
Check the survey work elevation & coodinate for blinding under Cluster 26
3347 KHEP-CI-3347
grade beam Cluster 26 BC4 BC4
NA Division 3 17-Jan-2018 18-Jan-2018 10:00 AM 20-Jan-2018 A Approved Closed
Dam proofing surface preparation for RC grade beam from inside Cluster 16
3348 KHEP-CI-3348
Cluster 16 BC4 BC4
NA Division 7 17-Jan-2018 18-Jan-2018 10:00 AM 20-Jan-2018 A Approved Closed
3349 KHEP-CI-3349 Compaction test final layer under slab on grade Cluster 14 B2 Cluster 14 B2 NA Division 2 17-Jan-2018 18-Jan-2018 10:00 AM 21-Jan-2018 A Approved Closed
Compaction test first layer pre final layer for back filling under slab
3350 KHEP-CI-3350
on grade Cluster 13 B2
Cluster 13 B2 NA Division 3 17-Jan-2018 18-Jan-2018 10:00 AM 21-Jan-2018 A Approved Closed
Blinding concrete sampling testing & placement inspection for footing Cluster 59
3351 KHEP-CI-3351
foundation Cluster 59 BC6 BC6
NA Division 3 17-Jan-2018 18-Jan-2018 9:30 AM 20-Jan-2018 A Approved Closed
Inspection of Reinforcement steel bar Form work for base for Sewer
GRP Manholes (Precast yard) Zone 3B & 4B, Line Line
3352 KHEP-CI-3352 19,20,21,22,16,37,35,17 MH-2-L19 MH-3-L09 MH-1-L20 MH-1-A-L20 19,20,21,22,1 Zone 3B & 4B Division 33 17-Jan-2018 18-Jan-2018 11:00 AM 20-Jan-2018 A Approved Closed
MH-1-L21 MH-1-L22 MH-1-A-L22 MH-2-L22 MH-4-L16 MH-1-L37 MH- 6,37,35,17
1-L17 MH-1-L35
Inspection of Reinforcement steel bar Form work for base for Sewer
Line
GRP Manholes (Precast yard) Zone 3B & 4B, Line 2,25,26,1,17,23
3353 KHEP-CI-3353
MH-23-L02 MH-24-L02 MH-4-L26 MH-23-A-L02 MH-1-L25 MH-28-L01
2,25,26,1,17, Zone 3B & 4B Division 33 17-Jan-2018 18-Jan-2018 11:00 AM 20-Jan-2018 A Approved Closed
23
MH-27-L01 MH-2-L17 MH-2A-L17 MH-2-L23
Cluster 47
3354 KHEP-CI-3354 Compaction test footing general fill 3rd layer Zone 3B Cluster 47 BC6
BC6
Zone 3B Division 31 17-Jan-2018 18-Jan-2018 2:00 PM 21-Jan-2018 A Approved Closed
Cluster 49
3355 KHEP-CI-3355 Compaction test footing general fill 3rd layer Zone 3B Cluster 49 BC6
BC6
Zone 3B Division 31 17-Jan-2018 18-Jan-2018 2:00 PM 21-Jan-2018 A Approved Closed
Cast in place concrete form work inspection for RC grade beam Cluster 36
3358 KHEP-CI-3358
Cluster 36 BC4 BC4
NA Division 3 18-Jan-2018 20-Jan-2018 10:00 AM 21-Jan-2018 A Approved Closed
Installation of Reinforceing Steel Bar Embedded Item & Closure Cluster 37 Approved w/
3360 KHEP-CI-3360
Inspection for RC column ground floor Cluster 37 BC4 BC4
NA Division 3 18-Jan-2018 20-Jan-2018 2:00 PM 22-Jan-2018 B comments
Closed
Check the survey work elevation & coodinate for blinding under Cluster 76
3361 KHEP-CI-3361
grade beam Cluster 76 BC4 BC4
NA Division 1 18-Jan-2018 20-Jan-2018 10:00 AM 21-Jan-2018 A Approved Closed
Check the survey work elevation & coodinate for blinding under Cluster 79
3362 KHEP-CI-3362
grade beam Cluster 79 BC4 BC4
NA Division 1 18-Jan-2018 20-Jan-2018 10:00 AM 21-Jan-2018 A Approved Closed
Check the survey work elevation & coodinate for blinding under Cluster 74
3363 KHEP-CI-3363
grade beam Cluster 74 BC4 BC4
NA Division 1 18-Jan-2018 20-Jan-2018 10:00 AM 21-Jan-2018 A Approved Closed
Check the survey work elevation & coodinate for blinding under
3364 KHEP-CI-3364
grade beam Cluster 67 A4
Cluster 67 A4 NA Division 1 18-Jan-2018 20-Jan-2018 10:00 AM 23-Jan-2018 A Approved Closed
Cast in place concrete form work inspection for RC stairs first flight Cluster 50
3365 KHEP-CI-3365
including 8 columns beside ground floor Cluster 50 BC4 BC4
NA Division 3 18-Jan-2018 20-Jan-2018 10:00 AM 21-Jan-2018 A Approved Closed
Compaction test around footing general fill final layer Zone 3B Cluster 78
3369 KHEP-CI-3369
Cluster 78 BC4 BC4
Zone 3B Division 31 18-Jan-2018 20-Jan-2018 2:00 PM 21-Jan-2018 A Approved Closed
Cast in place concrete form work inspection for RC column ground Cluster 24 Approved w/
3370 KHEP-CI-3370
floor Cluster 24 BC4 BC4
NA Division 3 20-Jan-2018 21-Jan-2018 10:00 AM 23-Jan-2018 B comments
Closed
Cast in place concrete form work inspection for RC grade beam Cluster 25
3371 KHEP-CI-3371
Cluster 25 BC4 BC4
NA Division 3 20-Jan-2018 21-Jan-2018 10:00 AM 22-Jan-2018 A Approved Closed
Concrete sampling testing & placement inspection for RC first floor Cluster 21
3373 KHEP-CI-3373
slab & stairs Cluster 21 BC4 BC4
NA Division 3 20-Jan-2018 21-Jan-2018 9:00 AM 22-Jan-2018 A Approved Closed
Concrete sampling testing & placement inspection for RC roof slab Cluster 16
3374 KHEP-CI-3374
Cluster 16 BC4 BC4
NA Division 3 20-Jan-2018 21-Jan-2018 9:00 AM 22-Jan-2018 A Approved Closed
Installation of Reinforceing Steel Bar Embedded Item & Closure Cluster 21 Approved w/
3375 KHEP-CI-3375
Inspection for RC first floor Cluster 21 BC4 BC4
NA Division 3 20-Jan-2018 21-Jan-2018 2:00 PM 22-Jan-2018 B comments
Closed
Compaction test general fill main line 4th layer sewer main line Zone
3377 KHEP-CI-3377
1B Line 1 MH-8-L01 to MH-7-L01 MH-7-L01 to MH-6-L01
Line 1 Zone 1B Division 31 20-Jan-2018 21-Jan-2018 11:00 AM 22-Jan-2018 A Approved Closed
Inspection of pre back filling for around manhole storm main line
3378 KHEP-CI-3378
Zone 1B Line 13 MH-I39-L13 MH-I40-L13 MH-I41-L13 MH-I42-L13
Line 13 Zone 1B Division 31 20-Jan-2018 21-Jan-2018 11:00 AM 23-Jan-2018 A Approved Closed
Compaction test around footing general fill first layer Zone 2B Cluster Cluster 31
3381 KHEP-CI-3381
31 BC2 BC2
Zone 2B Division 31 20-Jan-2018 21-Jan-2018 2:30 PM 22-Jan-2018 A Approved Closed
Installation for sewer GRP manhole sewer main line Zone 2B & 3B
3384 KHEP-CI-3384 Line 1,2 MH-10-L02 MH-11-L02 MH-14-02 MH-12-L02 MH-13-L02 Line 1,2 Zone 2B, 3B Division 31 20-Jan-2018 21-Jan-2018 10:30 AM 22-Jan-2018 A Approved Closed
MH-15-L02 MH-12-L01 MH-11-L01 MH-10-L01
Inspection of gravel bedding installation under senatary sewer
3385 KHEP-CI-3385 manhole base with geotextile protection sheet sewer main line Zone Line 1,2 Zone 1B Division 31 20-Jan-2018 21-Jan-2018 10:30 AM 23-Jan-2018 E Rejected Closed
1B Line 1,2 MH-2-L02 MH-2-A-L02 MH-1-L02 & MH-4-L01
Cast in place concrete form work inspection for RC slab & RC Beams Approved w/
3387 KHEP-CI-3387
Roof Floor Cluster 71 B2
Cluster 71 B2 NA Division 3 21-Jan-2018 22-Jan-2018 10:00 AM 24-Jan-2018 B comments
Closed
Cast in place concrete form work inspection for RC column first floor
3389 KHEP-CI-3389
Cluster 72 B2
Cluster 72 B2 NA Division 3 21-Jan-2018 22-Jan-2018 2:30 PM 23-Jan-2018 A Approved Closed
Cast in place concrete form work inspection for RC column first floor
3390 KHEP-CI-3390
coverage inside of grid line H-N/1-6 Cluster 81 A6
Cluster 81 A6 NA Division 3 21-Jan-2018 22-Jan-2018 3:00 PM 23-Jan-2018 A Approved Closed
Concrete sampling testing & placement inspection for RC column first Approved w/
3392 KHEP-CI-3392
floor coverage inside of grid line A-G/1-6 Cluster 81 A6
Cluster 81 A6 NA Division 3 21-Jan-2018 22-Jan-2018 9:30 AM 23-Jan-2018 B comments
Closed
Compaction test first layer pre final layer for back filling under slab
3394 KHEP-CI-3394
on grade Cluster 5 B2
Cluster 5 B2 NA Division 3 21-Jan-2018 22-Jan-2018 10:00 AM 23-Jan-2018 A Approved Closed
3395 KHEP-CI-3395 Compaction test final layer under slab on grade Cluster 13 B2 Cluster 13 B2 NA Division 3 21-Jan-2018 22-Jan-2018 10:00 AM 23-Jan-2018 A Approved Closed
Concrete sampling testing & placement inspection for RC column first Approved w/
3396 KHEP-CI-3396
floor Cluster 4 A6
Cluster 4 A6 NA Division 3 21-Jan-2018 22-Jan-2018 9:00 AM 23-Jan-2018 B comments
Closed
First coat damproofing installation inspection for footing & column Cluster 38
3397 KHEP-CI-3397
neck Cluster 38 BC6 BC6
NA Division 7 21-Jan-2018 22-Jan-2018 10:00 AM 23-Jan-2018 A Approved Closed
Box closing & grouting for storm embedded pice at manhole Zone 3B
3398 KHEP-CI-3398 Line 20 MH-68-L20 two side MH-69-L20 two side MH-70-L20 one Line 20 Zone 3B Division 33 21-Jan-2018 22-Jan-2018 10:30 AM 24-Jan-2018 A Approved Closed
side
Inspection of reinforcement steel bar form work & concrete pouring
3399 KHEP-CI-3399 for protection slab 21 pic storm main line precast yard Zone 3B Line Line 27 Zone 3B Division 33 21-Jan-2018 22-Jan-2018 11:30 AM 24-Jan-2018 A Approved Closed
27 MH-I97-L27 to MH-I98-L27
Compaction test around footing general fill 4th layer Zone 3B Cluster Cluster 47
3400 KHEP-CI-3400
47 BC6 BC6
Zone 3B Division 31 21-Jan-2018 22-Jan-2018 2:00 PM 23-Jan-2018 A Approved Closed
Inspection for pre back filling for around manhole sewer main line
3401 KHEP-CI-3401 Zone 1B Line 3,4 MH-1-L04 & MH-2-L04 MH1-L03 MH-2-L03 MH-3- Line 3,4 Zone 1B Division 31 21-Jan-2018 22-Jan-2018 11:00 AM 24-Jan-2018 A Approved Closed
L03
Inspection form work & concrete pouring for sewer back drop pice Approved w/
3402 KHEP-CI-3402
from IC to MH 160mm at Manhole Zone 1B Line 3 MH-1-A-L03
Line 3 Zone 1B Division 31 21-Jan-2018 22-Jan-2018 1:30 PM 24-Jan-2018 B comments
Closed
Installation for sewer GRP manholes sewer main line Zone 1B Line
3403 KHEP-CI-3403
1,2 MH-2-L02 MH-2-A-L02 MH-1-L02 & MH-4-L01
Line 1,2 Zone 1B Division 31 21-Jan-2018 22-Jan-2018 10:30 AM 24-Jan-2018 A Approved Closed
Concrete sampling testing & placement inspection for RC grade beam Cluster 36 Approved w/
3406 KHEP-CI-3406
Cluster 36 BC4 BC4
NA Division 3 22-Jan-2018 23-Jan-2018 9:00 AM 24-Jan-2018 B comments
Closed
Concrete sampling testing & placement inspection for RC column first Approved w/
3407 KHEP-CI-3407
floor Cluster 35 B2
Cluster 35 B2 NA Division 3 22-Jan-2018 23-Jan-2018 9:00 AM 24-Jan-2018 B comments
Closed
Second coat dam proofing installation for footing & column neck Cluster 38
3408 KHEP-CI-3408
Cluster 38 BC6 BC6
NA Division 7 22-Jan-2018 23-Jan-2018 10:00 AM 24-Jan-2018 A Approved Closed
Concrete sampling testing & placement inspection for RC stair first Cluster 50
3411 KHEP-CI-3411
flight including 8 columns beside Cluster 50 BC4 BC4
NA Division 3 22-Jan-2018 23-Jan-2018 9:30 AM 23-Jan-2018 A Approved Closed
Concrete sampling testing & placement inspection for RC slab &
3412 KHEP-CI-3412
beams roof floor Cluster 52 B2
Cluster 52 B2 NA Division 3 22-Jan-2018 23-Jan-2018 9:30 AM 23-Jan-2018 A Approved Closed
Compaction test first layer pre final layer for backfilling under slab on
3413 KHEP-CI-3413
grade Cluster 7 B2
Cluster 7 B2 NA Division 3 22-Jan-2018 23-Jan-2018 10:00 AM 25-Jan-2018 E Rejected Closed
Compaction test first layer pre final layer for backfilling under slab on
3414.1 KHEP-CI-3413-01
grade Cluster 7 B2
Cluster 7 B2 NA Division 3 27-Jan-2018 28-Jan-2018 10:00 AM 30-Jan-2018 A Approved Closed
Inspection reinforcement steel bar & internal shutter for storm catch
basin pre cast yard Zone 3B Line 18,20,27,39 CB-147 MH-61-L18 CB-
148,149 MH-62-L18 CB-150 CB-151 MH-63-L18 CB-152 CB153 MH- Line Approved w/
3414 KHEP-CI-3414
64-L18 CB154 CB-155 MH-136-L39 CB-156 CB-156 CB-158 MH-100- 18,20,27,39
Zone 3B Division 33 22-Jan-2018 23-Jan-2018 1:30 PM 24-Jan-2018 B comments
Closed
L27 CB-159 CB-160 MH-71-L20 CB-161 CB-162 MH-70-L20 CB-163
CB-164 CB-165 MH-68-L20 CB-166 MH-67-L20 Alongg RD 1 & 3
P(Sta 0+012
Inspection excavated & compaction formation for pipe trench water
3415 KHEP-CI-3415
line Zone 1B P(Sta 0+012 to Sta 0+100)
to Sta Zone 1B Division 31 22-Jan-2018 23-Jan-2018 11:00 AM 24-Jan-2018 A Approved Closed
0+100)
Compaction test of sandfilling & laying of around the sewer manholes
3416 KHEP-CI-3416 along alley 1,2 & 11 Zone 1B Line 31,33,34 MH-1-A-L34 MH-2-L34 Line 31,33,34 Zone 1B Division 31 22-Jan-2018 23-Jan-2018 11:00 AM 24-Jan-2018 A Approved Closed
MH-1-L33 MH-2-L31 MH-3-L31
Compaction test of sandfilling first layer around the sewer manholes Approved w/
3417 KHEP-CI-3417
along alley 1,2 & Zone 1B Line 31,34 MH-1-L34 MH-1-L31
Line 31,34 Zone 1B Division 31 22-Jan-2018 23-Jan-2018 10:30 AM 24-Jan-2018 B comments
Closed
Compaction test 5th layer general fill for pipe trench sewer main line
3419 KHEP-CI-3419
along rd 04 Zone 1B Line 1 MH-8-L01 MH-7-L01 MH-7-L01 MH-6-L01
Line 1 Zone 1B Division 31 22-Jan-2018 23-Jan-2018 10:00 AM 24-Jan-2018 A Approved Closed
Blinding Concrete Sampling testing & Placement Inspection for Grade Cluster 26 Approved w/
3422 KHEP-CI-3422
Beam Cluster 26 BC4 BC4
NA Division 3 23-Jan-2018 24-Jan-2018 10:00 AM 25-Jan-2018 B comments
Closed
First coat damproofing installation inspection for grade beam inside Cluster 16
3423 KHEP-CI-3423
Cluster 16 BC4 BC4
NA Division 7 23-Jan-2018 24-Jan-2018 10:00 AM 24-Jan-2018 A Approved Closed
Cast in place concrete form work inspection for RC first floor slab & Cluster 18
3424 KHEP-CI-3424
stairs Cluster 18 BC4 BC4
NA Division 3 23-Jan-2018 24-Jan-2018 10:00 AM 29-Jan-2018 E Rejected Closed
Cast in place concrete form work inspection for RC first floor slab & Cluster 18
3424.1 KHEP-CI-3424-01
stairs Cluster 18 BC4 BC4
NA Division 3 31-Jan-2018 1-Feb-2018 10:00 AM 1-Feb-2018 A Approved Closed
Blinding Concrete Sampling testing & Placement Inspection for Grade Cluster 76
3427 KHEP-CI-3427
Beam Cluster 76 BC4 BC4
NA Division 3 23-Jan-2018 24-Jan-2018 9:30 AM 24-Jan-2018 A Approved Closed
Blinding Concrete Sampling testing & Placement Inspection for Grade Cluster 79
3428 KHEP-CI-3428
Beam Cluster 79 BC4 BC4
NA Division 3 23-Jan-2018 24-Jan-2018 9:30 AM 24-Jan-2018 A Approved Closed
70cm CMU Morter & Masonry Inspection Under Exterior Reinforced Cluster 49
3429 KHEP-CI-3429
Grade Beam Cluster 49 BC6 BC6
NA Division 3 23-Jan-2018 24-Jan-2018 10:00 AM 24-Jan-2018 A Approved Closed
Cast in place concrete form work inspection for RC column first floor Cluster 21
3436 KHEP-CI-3436
Cluster 21 BC4 BC4
NA Division 3 23-Jan-2018 24-Jan-2018 2:00 PM 24-Jan-2018 A Approved Closed
Installation of Sewer GRP Manholes Sewer mani line Zone 1B, Line 1
3437 KHEP-CI-3437
MH-10-L01 Mh-11-L01 MH-12-L01
Line 1 Zone 1B Division 31 23-Jan-2018 24-Jan-2018 10:30 AM 25-Jan-2018 A Approved Closed
Cast in place concrete form work inspection for RC column first floor
3440 KHEP-CI-3440
Cluster 30 B2
Cluster 30 B2 NA Division 3 23-Jan-2018 24-Jan-2018 10:00 AM 24-Jan-2018 A Approved Closed
70cm CMU Morter & Masonry Inspection Under Exterior Reinforced Cluster 28
3441 KHEP-CI-3441
Grade Beam Cluster 28 BC4 BC4
NA Division 4 24-Jan-2018 25-Jan-2018 2:00 PM 25-Jan-2018 A Approved Closed
Cast in place concrete form work inspection for RC column first floor
3442 KHEP-CI-3442
Cluster 34 B2
Cluster 34 B2 NA Division 3 24-Jan-2018 25-Jan-2018 10:00 AM 29-Jan-2018 A Approved Closed
Second coat dam proofing installation inspection for grade beam Cluster 16
3444 KHEP-CI-3444
inside Cluster 16 BC4 BC4
NA Division 7 24-Jan-2018 25-Jan-2018 10:00 AM 27-Jan-2018 A Approved Closed
First coat Dam proofing installation insoection for RC footing & Cluster 62
3446 KHEP-CI-3446
column neck Cluster 62 BC6 BC6
NA Division 3 24-Jan-2018 25-Jan-2018 10:30 AM 27-Jan-2018 A Approved Closed
Compaction test general fill main line 6th layer sewer main line Zone
3451 KHEP-CI-3451
1B Line 1 MH-8-L01 MH-7-L01 MH-7-L01 MH-6-L01
Line 1 Zone 1B Division 31 24-Jan-2018 25-Jan-2018 11:00 AM 27-Jan-2018 A Approved Closed
Compaction test around footing general 1st layer Zone 1B Cluster 38 Cluster 38
3452 KHEP-CI-3452
BC6 BC6
Zone 1B Division 31 24-Jan-2018 25-Jan-2018 2:30 PM 27-Jan-2018 A Approved Closed
Inspection form work for base & wall for storm catch basin pre cast
yard Zone 3B Line 18,20,27,39 CB-147 MH-61-L18 CB-148,149 MH-
62-L18 CB-150 CB-151 MH-63-L18 CB-152 CB153 MH-64-L18 CB154 Line
3454 KHEP-CI-3454
CB-155 MH-136-L39 CB-156 CB-156 CB-158 MH-100-L27 CB-159 CB- 18,20,27,39
Zone 3B Division 33 24-Jan-2018 25-Jan-2018 1:30 PM 27-Jan-2018 A Approved Closed
160 MH-71-L20 CB-161 CB-162 MH-70-L20 CB-163 CB-164 CB-165
MH-68-L20 CB-166 MH-67-L20 Alongg RD 1 & 3
Inspection for sewer GRP manholes sewer main line MH-13-L01 MH-
3457 KHEP-CI-3457
14-L01 MH-15-L01 MH-9-L01 Zone 1B Line 1
Line 1 Zone 1B Division 31 25-Jan-2018 27-Jan-2018 10:30 AM 29-Jan-2018 A Approved Closed
Inspection of pre back filling for around manhole sewer main line
3458 KHEP-CI-3458 MH-5-A-L02 MH-4-L02 MH-3-L02 MH-1-L05 MH-2-L05 Zone 1B Line Line 2,5 Zone 1B Division 31 25-Jan-2018 27-Jan-2018 11:00 AM 29-Jan-2018 A Approved Closed
2,5
Concrete sampling testing & placement inspection for RC slab roof
3459 KHEP-CI-3459
floor Cluster 71 B2
Cluster 71 B2 NA Division 3 25-Jan-2018 27-Jan-2018 9:30 AM 29-Jan-2018 A Approved Closed
70cm CMU morter & masonry inspection under exterior reinforced Cluster 47
3460 KHEP-CI-3460
grade beam Cluster 47 BC6 BC6
NA Division 1 25-Jan-2018 27-Jan-2018 2:00 PM 28-Jan-2018 A Approved Closed
Check the survey work elevation & coodinate for building under Cluster 70
3461 KHEP-CI-3461
grade beam Cluster 70 BC4 BC4
NA Division 1 25-Jan-2018 27-Jan-2018 10:00 AM 28-Jan-2018 A Approved Closed
Cast in place concrete form work inspection for RC grade beam Cluster 42
3463 KHEP-CI-3463
Cluster 42 BC4 BC4
NA Division 3 27-Jan-2018 28-Jan-2018 10:00 AM 29-Jan-2018 A Approved Closed
Second coat dam proofing installation for grade beam internal face
3465 KHEP-CI-3465
only inside the building Cluster 61 B2
Cluster 61 B2 NA Division 7 27-Jan-2018 28-Jan-2018 1:30 PM 29-Jan-2018 A Approved Closed
Second coat dam proofing installation for RC footing & column neck Cluster 62
3466 KHEP-CI-3466
Cluster 62 BC6 BC6
NA Division 7 27-Jan-2018 28-Jan-2018 2:00 PM 29-Jan-2018 A Approved Closed
Compaction testaround footing general fill 2nd layer Zone 2B Cluster Cluster 38
3469 KHEP-CI-3469
38 BC6 BC6
Zone 2B Division 31 27-Jan-2018 28-Jan-2018 2:30 PM 29-Jan-2018 A Approved Closed
Box Closing & Grounding for storm embedded pice at manhole Zone
3470 KHEP-CI-3470
1B Line 15 MH-54-L15 MH-46-L15
Line 15 Zone 1B Division 33 27-Jan-2018 28-Jan-2018 11:00 AM 30-Jan-2018 A Approved Closed
Inspection concrete pouring storm catch basin pre cast yard Zone
3B Line 18,20,27,39 CB-147 MH-61-L18 CB-148,149 MH-62-L18 CB-
150 CB-151 MH-63-L18 CB-152 CB153 MH-64-L18 CB154 CB-155 Line Approved w/
3472 KHEP-CI-3472
MH-136-L39 CB-156 CB-156 CB-158 MH-100-L27 CB-159 CB-160 18,20,27,39
Zone 3B Division 33 27-Jan-2018 28-Jan-2018 11:00 AM 29-Jan-2018 B comments
Closed
MH-71-L20 CB-161 CB-162 MH-70-L20 CB-163 CB-164 CB-165 MH-
68-L20 CB-166 MH-67-L20 Alongg RD 1 & 3
Compaction test general fill main line 7th layer sewer main line Zone
3473 KHEP-CI-3473
1B Line 1 MH-8-L01 MH-7-L01 MH-7-L01 MH-6-L01
Line 1 Zone 1B Division 31 27-Jan-2018 28-Jan-2018 11:00 AM 29-Jan-2018 A Approved Closed
3479 KHEP-CI-3479 Compaction test final layer under slab on grade Cluster 5 B2 Cluster 5 B2 NA Division 3 27-Jan-2018 28-Jan-2018 10:00 AM 30-Jan-2018 A Approved Closed
Compaction test first layer pre final layer for backfilling under slab on
3480 KHEP-CI-3480
grade Cluster 10 B2
Cluster 10 B2 NA Division 3 27-Jan-2018 28-Jan-2018 10:00 AM 30-Jan-2018 A Approved Closed
Concrete sampling testing & placement inspection for RC column first Cluster 21
3481 KHEP-CI-3481
floor Cluster 21 BC4 BC4
NA Division 3 27-Jan-2018 28-Jan-2018 9:00 AM 29-Jan-2018 A Approved Closed
Cast in place concrete form work inspection for RC first floor slab &
3482 KHEP-CI-3482
stair Cluster 44 A6
Cluster 44 A6 NA Division 3 28-Jan-2018 29-Jan-2018 10:00 AM 30-Jan-2018 A Approved Closed
Concrete sampling testing & placement inspection for RC column first Approved w/
3484 KHEP-CI-3484
floor Cluster 34 B2
Cluster 34 B2 NA Division 3 28-Jan-2018 29-Jan-2018 9:00 AM 29-Jan-2018 B comments
Closed
70cm CMU morter & masonry inspection under exterior reinforced Cluster 39
3485 KHEP-CI-3485
grade beam Cluster 39 BC6 BC6
NA Division 4 28-Jan-2018 29-Jan-2018 2:00 PM 30-Jan-2018 A Approved Closed
Cast in place concrete form work inspection for RC slab on grade Approved w/
3486 KHEP-CI-3486
Cluster 14 B2
Cluster 14 B2 NA Division 3 28-Jan-2018 29-Jan-2018 10:00 AM 30-Jan-2018 B comments
Closed
70cm CMU morter & masonry inspection under exterior reinforced Cluster 29
3488 KHEP-CI-3488
grade beam Cluster 29 BC4 BC4
NA Division 3 28-Jan-2018 29-Jan-2018 2:00 PM 30-Jan-2018 A Approved Closed
Cast in place concrete form work inspection for RC grade beam Cluster 26
3489 KHEP-CI-3489
Cluster 26 BC4 BC4
NA Division 3 28-Jan-2018 29-Jan-2018 2:00 PM 31-Jan-2018 E Rejected Closed
Cast in place concrete form work inspection for RC grade beam Cluster 26
3489.1 KHEP-CI-3489-01
Cluster 26 BC4 BC4
NA Division 3 15-Feb-2018 17-Feb-2018 10:00 AM 19-Feb-2018 A Approved Closed
Installation of reinforcing steel bar embedded item & form closure Cluster 26
3490 KHEP-CI-3490
inspection for RC grade beam Cluster 26 BC4 BC4
NA Division 3 28-Jan-2018 29-Jan-2018 2:00 PM 31-Jan-2018 A Approved Closed
Inspection form work for base & wall & concrete Pouring for Storm
Line Zone
3491 KHEP-CI-3491 manholes Precast yard Zone 3B,4B,5C Line 26,27,33 MH-124-L33
26,27,33 3B,4B,5C
Division 33 28-Jan-2018 29-Jan-2018 2:00 PM 29-Jan-2018 E Rejected Closed
MH-105-L27 MH-101-L27 MH-110A-L27 MH-127-L26
Inspection form work for base & wall & concrete Pouring for Storm
Line Zone
3491.1 KHEP-CI-3491-01 manholes Precast yard Zone 3B,4B,5C Line 26,27,33 MH-124-L33
26,27,33 3B,4B,5C
Division 33 30-Jan-2018 31-Jan-2018 2:00 PM 1-Feb-2018 E Rejected Closed
MH-105-L27 MH-101-L27 MH-110A-L27 MH-127-L26
Inspection form work for base & wall & concrete Pouring for Storm
Line Zone
3491.2 KHEP-CI-3491-02 manholes Precast yard Zone 3B,4B,5C Line 26,27,33 MH-124-L33
26,27,33 3B,4B,5C
Division 33 3-Feb-2018 4-Feb-2018 2:00 PM 6-Feb-2018 E Rejected Closed
MH-105-L27 MH-101-L27 MH-110A-L27 MH-127-L26
Inspection form work for base & wall & concrete Pouring for Storm
Line Zone
3491.3 KHEP-CI-3491-03 manholes Precast yard Zone 3B,4B,5C Line 26,27,33 MH-124-L33
26,27,33 3B,4B,5C
Division 33 7-Feb-2018 8-Feb-2018 2:00 PM 10-Feb-2018 A Approved Closed
MH-105-L27 MH-101-L27 MH-110A-L27 MH-127-L26
Compaction test of sanding Bedding under Pipe 2nd layer & laying
3493 KHEP-CI-3493 warning tape around manhole storm main line Zone 1B Line 11,13 Line 11,13 Zone 1B Division 31 28-Jan-2018 29-Jan-2018 11:00 AM 29-Jan-2018 A Approved Closed
MH-I34-L11 MH-I42-L13 MH-I40-L13 MH-I39-L13
Termite control surface preparation installation & final inspection fo
3494 KHEP-CI-3494
grade beam Cluster 67 A4
Cluster 67 A4 NA Division 3 28-Jan-2018 29-Jan-2018 9:30 AM 30-Jan-2018 A Approved Closed
Blinding concrete sampling testing & placement inspection for grade Cluster 74
3502 KHEP-CI-3502
beams Cluster 74 BC4 BC4
NA Division 3 28-Jan-2018 29-Jan-2018 9:30 AM 30-Jan-2018 A Approved Closed
Cast in place concrete form work inspection for RC slab first floor &
3503 KHEP-CI-3503
stairs ground floor Cluster 66 A4
Cluster 66 A4 NA Division 3 28-Jan-2018 29-Jan-2018 2:30 PM 30-Jan-2018 A Approved Closed
Cast in place concrete form work inspection for Rc column first floor
3505 KHEP-CI-3505
Cluster 54 B2
Cluster 54 B2 NA Division 3 29-Jan-2018 30-Jan-2018 10:30 AM 31-Jan-2018 A Approved Closed
Blinding concrete sampling testing & placement inspection for grade Cluster 77
3506 KHEP-CI-3506
beam Cluster 77 BC4 BC4
NA Division 3 29-Jan-2018 30-Jan-2018 9:30 AM 31-Jan-2018 A Approved Closed
Blinding concrete sampling testing & placement inspection for grade Cluster 78
3507 KHEP-CI-3507
beam Cluster 78 BC4 BC4
NA Division 3 29-Jan-2018 30-Jan-2018 9:30 AM 31-Jan-2018 A Approved Closed
Blinding concrete sampling testing & placement inspection for grade Cluster 70
3508 KHEP-CI-3508
beam Cluster 70 BC4 BC4
NA Division 3 29-Jan-2018 30-Jan-2018 9:30 AM 31-Jan-2018 A Approved Closed
Dam proofing Surface Preparation for RC Footing & Column Neck Cluster 80
3509 KHEP-CI-3509
Cluster 80 BC6 BC6
NA Division 3 29-Jan-2018 30-Jan-2018 10:00 AM 31-Jan-2018 A Approved Closed
3510 KHEP-CI-3510 Compaction test final layer under slab on grade Cluster 10 B2 Cluster 10 B2 NA Division 3 29-Jan-2018 30-Jan-2018 10:00 AM 31-Jan-2018 A Approved Closed
Commpaction test general fill around manhole 1st layer sewer main
Line
3512 KHEP-CI-3512 line MH-1-L04 MH-2-L04 MH-1-A-L34 MH-2-L04 MH-1-A-L33 MH-1-
4,31,33,34
Zone 1B Division 31 29-Jan-2018 30-Jan-2018 11:00 AM 31-Jan-2018 E Rejected Closed
L33 MH-2-L31 MH-3-L31 Zone 1B Line 4,31,33,34
Commpaction test general fill around manhole 1st layer sewer main
Line
3512.1 KHEP-CI-3512-01 line MH-1-L04 MH-2-L04 MH-1-A-L34 MH-2-L04 MH-1-A-L33 MH-1-
4,31,33,34
Zone 1B Division 31 3-Feb-2018 4-Feb-2018 11:00 AM 5-Feb-2018 A Approved Closed
L33 MH-2-L31 MH-3-L31 Zone 1B Line 4,31,33,34
Commpaction test general fill around manhole 1st layer sewer main
3513 KHEP-CI-3513
line MH-I41-L13 Zone 1B Line 13
Line 13 Zone 1B Division 31 29-Jan-2018 30-Jan-2018 11:00 AM 31-Jan-2018 A Approved Closed
Cast in place concrete form work inspection for RC slab on grade Approved w/
3518.1 KHEP-CI-3518-01
Cluster 13 B2
Cluster 13 B2 NA Division 3 4-Feb-2018 5-Feb-2018 10:00 AM 6-Feb-2018 B comments
Closed
3528 KHEP-CI-3528 Compaction test final layer under slab on grade Cluster 7 B2 Cluster 7 B2 NA Division 3 30-Jan-2018 31-Jan-2018 10:00 AM 31-Jan-2018 A Approved Closed
Cast in place concrete form work inspection for RC first floor slab & Cluster 23
3529 KHEP-CI-3529
stair Cluster 23 BC4 BC4
NA Division 3 31-Jan-2018 1-Feb-2018 10:00 AM 4-Feb-2018 A Approved Closed
Installation of Rein forcement steel bar Embedded item & Closure Cluster 23
3530 KHEP-CI-3530
Inspection for RC first floor slab & stair Cluster 23 BC4 BC4
NA Division 3 31-Jan-2018 1-Feb-2018 10:00 AM 1-Feb-2018 A Approved Closed
Concrete sampling testing & placement Inspection for RC first floor Approved w/
3531 KHEP-CI-3531
slab & stair Cluster 44 A6
Cluster 44 A6 NA Division 3 31-Jan-2018 1-Feb-2018 9:00 AM 1-Feb-2018 B comments
Closed
Cast in place concrete form work inspection for RC column ground Cluster 37
3534 KHEP-CI-3534
floor Cluster 37 BC4 BC4
NA Division 3 31-Jan-2018 1-Feb-2018 10:00 AM 1-Feb-2018 A Approved Closed
Cast in place concrete form work inspection for RC slab first floor & Cluster 60 Approved w/
3542 KHEP-CI-3542
stairs 2nd flight ground floor Cluster 60 BC4 BC4
NA Division 3 1-Feb-2018 3-Feb-2018 10:00 AM 3-Feb-2018 B comments
Closed
Cast in place concrete form work inspection for RC column ground Cluster 25
3547 KHEP-CI-3547
floor Cluster 25 BC4 BC4
NA Division 3 1-Feb-2018 3-Feb-2018 10:00 AM 3-Feb-2018 A Approved Closed
Compaction test around footing general fill 1st layer Cluster 62 BC6 Cluster 62
3550 KHEP-CI-3550
Zone 3B BC6
Zone 3B Division 31 1-Feb-2018 3-Feb-2018 2:30 PM 6-Feb-2018 A Approved Closed
Cast in place concrete form work inspection for RC column first floor
3551 KHEP-CI-3551
axis H-N Cluster 44 A6
Cluster 44 A6 NA Division 3 3-Feb-2018 4-Feb-2018 10:00 AM 5-Feb-2018 A Approved Closed
Concrete sampling testing & placement Inspection for RC first floor Cluster 18
3554 KHEP-CI-3554
slab & stair Cluster 18 BC4 BC4
NA Division 3 3-Feb-2018 4-Feb-2018 9:00 AM 6-Feb-2018 E Rejected Closed
Installation of Rein forcing steel bar Embedded item & Closure Cluster 18
3555 KHEP-CI-3555
Inspection for RC column first floor Cluster 18 BC4 BC4
NA Division 3 3-Feb-2018 4-Feb-2018 2:00 PM 5-Feb-2018 A Approved Closed
Inspection for excavated formation for pipe trench sewer main line
3556 KHEP-CI-3556
Dia 200mm Zone 1B Line 2 MH-5-L01 MH-4-L01
Line 2 Zone 1B Division 31 3-Feb-2018 4-Feb-2018 9:30 AM 6-Feb-2018 A Approved Closed
Inspection form work for base & wall & concrete pouring for storm
catch basin precast yard Zone 2B Line 7,18,1,35 11pic CB-178 MH- Line
3557 KHEP-CI-3557 79-L21 & CB-177- CB-176 MH-105-L27 & CB170 CB171 MH-101-L27 7,18,1,35 Zone 2B Division 33 3-Feb-2018 4-Feb-2018 11:30 AM 5-Feb-2018 A Approved Closed
& CB-169 CB-168 MH-77-L21 & CB-172 CB-173 CB-174 MH-78-L21 & 11pic
CB-167 MH-67-L20
First coat dam proofing installation inspection for CMU morter &
Cluster 28
3558 KHEP-CI-3558 masonry inspection Under Exterior Reinforced Grade Beam Cluster
BC4
NA Division 7 4-Feb-2018 5-Feb-2018 10:00 AM 6-Feb-2018 A Approved Closed
28 BC4
Concrete sampling testing & placement Inspection for RC column Cluster 25
3559 KHEP-CI-3559
ground floor Cluster 25 BC4 BC4
NA Division 3 4-Feb-2018 5-Feb-2018 9:00 AM 6-Feb-2018 E Rejected Closed
Concrete sampling testing & placement Inspection for RC column Cluster 25 Approved w/
3559.1 KHEP-CI-3559-01
ground floor Cluster 25 BC4 BC4
NA Division 3 19-Feb-2018 20-Feb-2018 9:00 AM 24-Feb-2018 B comments
Closed
Concrete sampling testing & placement inspection for RC slab first Cluster 60
3560 KHEP-CI-3560
floor & 2nd flight stairs Cluster 60 BC4 BC4
NA Division 3 4-Feb-2018 5-Feb-2018 9:30 AM 6-Feb-2018 A Approved Closed
Cast in place concrete form work inspection for RC column first floor Cluster 18
3565 KHEP-CI-3565
Cluster 18 BC4 BC4
NA Division 3 5-Feb-2018 6-Feb-2018 9:00 AM 7-Feb-2018 A Approved Closed
First coat dam proofing installation inspection for CMU morter &
Cluster 29
3566 KHEP-CI-3566 masonry inspection under exterior rein forced grade beam Cluster 29
BC4
NA Division 7 5-Feb-2018 6-Feb-2018 10:00 AM 7-Feb-2018 A Approved Closed
BC4
Cast in place concrete form work inspection for RC roof slab floor
3567 KHEP-CI-3567
Cluster 6 BC4
Cluster 6 BC4 NA Division 3 5-Feb-2018 6-Feb-2018 10:00 AM 7-Feb-2018 A Approved Closed
Compaction test around footing general fill 4th layer Cluster 38 BC6 Cluster 38
3570 KHEP-CI-3570
Zone 2B BC6
Zone 2B Division 31 5-Feb-2018 6-Feb-2018 2:30 PM 7-Feb-2018 A Approved Closed
Cast in place concrete form work inspection for RC column first floor
3571 KHEP-CI-3571
axis A-G Cluster 44 A6
Cluster 44 A6 NA Division 3 5-Feb-2018 6-Feb-2018 11:00 AM 7-Feb-2018 A Approved Closed
First coat dam proofing installation inspection for CMU morter &
Cluster 49
3574 KHEP-CI-3574 masonry inspection under exterior reinforced grade beam Cluster 49
BC6
NA Division 7 6-Feb-2018 7-Feb-2018 1:35 PM 7-Feb-2018 A Approved Closed
BC6
First coat dam proofing installation inspection for CMU morter &
Cluster 47
3575 KHEP-CI-3575 masonry inspection under exterior reinforced grade beam Cluster 47
BC6
NA Division 7 6-Feb-2018 7-Feb-2018 1:30 PM 7-Feb-2018 A Approved Closed
BC6
Cast in place concrete form work inspection for RC column ground Cluster 55
3576 KHEP-CI-3576
floor Cluster 55 BC4 BC4
NA Division 3 6-Feb-2018 7-Feb-2018 2:00 PM 10-Feb-2018 A Approved Closed
Installation of reinforcing steel bar & embedded item & form closure Cluster 59
3577 KHEP-CI-3577
inspection for RC column neck Cluster 59 BC6 BC6
NA Division 3 6-Feb-2018 7-Feb-2018 2:30 PM 10-Feb-2018 A Approved Closed
Second coat dam proofing installation inspection for CMU morter &
Cluster 28
3579 KHEP-CI-3579 masonry Inspection under exterior reinforced grade beam Cluster 28
BC4
NA Division 7 6-Feb-2018 7-Feb-2018 10:00 AM 7-Feb-2018 A Approved Closed
BC4
Second coat dam proofing installation inspection for CMU morter &
Cluster 29
3580 KHEP-CI-3580 masonry Inspection under exterior reinforced grade beam Cluster 29
BC4
NA Division 7 6-Feb-2018 7-Feb-2018 10:00 AM 7-Feb-2018 A Approved Closed
BC4
Concrete sampling testing & placement Inspection for RC first foor Cluster 23 Approved w/
3581 KHEP-CI-3581
slab & stair Cluster 23 BC4 BC4
NA Division 3 6-Feb-2018 7-Feb-2018 9:00 AM 7-Feb-2018 B comments
Closed
Concrete sampling testing & placement Inspection for RC column Cluster 37 Approved w/
3582 KHEP-CI-3582
ground floor Cluster 37 BC4 BC4
NA Division 3 6-Feb-2018 7-Feb-2018 9:00 AM 7-Feb-2018 B comments
Closed
Concrete sampling testing & placement Inspection for RC slab on Approved w/
3583 KHEP-CI-3583
grade Cluster 13 B2
Cluster 13 B2 NA Division 3 6-Feb-2018 7-Feb-2018 9:00 AM 7-Feb-2018 B comments
Closed
Cast in place concrete form work inspection for RC slab on grade Approved w/
3585 KHEP-CI-3585
Cluster 5 B2
Cluster 5 B2 NA Division 3 6-Feb-2018 7-Feb-2018 9:00 AM 10-Feb-2018 B comments
Closed
Installation of reinforcing steel bar & embedded item & form closure
3586 KHEP-CI-3586
inspection for RC slab on grade Cluster 5 B2
Cluster 5 B2 NA Division 3 6-Feb-2018 7-Feb-2018 9:00 AM 10-Feb-2018 A Approved Closed
Installation of reinforcing steel bar & embedded item & form closure Cluster 23
3587 KHEP-CI-3587
inspection for RC column first floor Cluster 23 BC4 BC4
NA Division 3 6-Feb-2018 7-Feb-2018 11:00 AM 10-Feb-2018 A Approved Closed
Cast in place concrete form work inspection for RC parapet foof slab
3588 KHEP-CI-3588
Cluster 3 A6
Cluster 3 A6 NA Division 3 7-Feb-2018 8-Feb-2018 2:00 PM 13-Feb-2018 A Approved Closed
Installation reinforcing steel bar embedded item & form closure Cluster 36
3590 KHEP-CI-3590
inspection for RC column ground floor Cluster 36 BC4 BC4
NA Division 3 7-Feb-2018 8-Feb-2018 10:00 AM 10-Feb-2018 A Approved Closed
Installation of reinforcing steel bar & embedded item & form closure Cluster 23
3591 KHEP-CI-3591
inspection for RC column first floor Cluster 60 BC4 BC4
NA Division 3 7-Feb-2018 8-Feb-2018 9:00 AM 10-Feb-2018 A Approved Closed
First coat dam proofing installation inspection for CMU morter &
Cluster 39
3595 KHEP-CI-3595 masonry inspection under exterior reinforced grade beam Cluster 39
BC6
NA Division 3 7-Feb-2018 8-Feb-2018 10:00 AM 10-Feb-2018 A Approved Closed
BC6
Cast in place concrete form work inspection for RC slab on grade Approved w/
3596 KHEP-CI-3596
Cluster 10 B2
Cluster 10 B2 NA Division 3 7-Feb-2018 8-Feb-2018 10:00 AM 12-Feb-2018 B comments
Closed
Installation of reinforcing steel bar & embedded item & form closure Approved w/
3597 KHEP-CI-3597
inspection for RC slab on grade Cluster 10 B2
Cluster 10 B2 NA Division 3 7-Feb-2018 8-Feb-2018 10:00 AM 12-Feb-2018 B comments
Closed
Cast in place concrete form work inspection for RC slab first floor &
3598 KHEP-CI-3598
2nd flight stair Cluster 63 B2
Cluster 63 B2 NA Division 3 7-Feb-2018 8-Feb-2018 10:30 AM 10-Feb-2018 A Approved Closed
Installation of reinforcing steel bar & embedded item & form closure
3599 KHEP-CI-3599
inspection for RC slab first floor & 2nd flight stair Cluster 63 B2
Cluster 63 B2 NA Division 3 7-Feb-2018 8-Feb-2018 1:30 PM 10-Feb-2018 A Approved Closed
Cast in place concrete form work inspection for RC column first floor Cluster 23
3600 KHEP-CI-3600
Cluster 23 BC4 BC4
NA Division 3 8-Feb-2018 10-Feb-2018 10:00 AM 11-Feb-2018 A Approved Closed
Cast in place concrete form work inspection for RC roof slab Cluster Approved w/
3601 KHEP-CI-3601
33 B2
Cluster 33 B2 NA Division 3 8-Feb-2018 10-Feb-2018 10:00 AM 12-Feb-2018 B comments
Closed
Installation of reinforcing steel bar & embedded item & form closure
3602 KHEP-CI-3602
inspection for RC roof slab Cluster 33 B2
Cluster 33 B2 NA Division 3 8-Feb-2018 10-Feb-2018 10:00 AM 12-Feb-2018 A Approved Closed
Compaction test first layer pre final layer for back filling under slan
3603 KHEP-CI-3603
on grade Cluster 11 B2
Cluster 11 B2 NA Division 3 8-Feb-2018 10-Feb-2018 10:00 AM 13-Feb-2018 A Approved Closed
Compaction test first layer pre final layer for back filling under slan
3604 KHEP-CI-3604
on grade Cluster 12 B2
Cluster 12 B2 NA Division 3 8-Feb-2018 10-Feb-2018 10:00 AM 13-Feb-2018 A Approved Closed
Concrete sampling testing & placement inspection for RC cloumn first Cluster 18
3605 KHEP-CI-3605
floor Cluster 18 BC4 BC4
NA Division 3 8-Feb-2018 10-Feb-2018 9:00 AM 11-Feb-2018 A Approved Closed
Second coat dam proofing installation inspection for CMU mortar &
Cluster 39
3608 KHEP-CI-3608 masonry inspection under exterior reinforced grade beam Cluster 39
BC6
NA Division 7 8-Feb-2018 10-Feb-2018 10:00 AM 11-Feb-2018 A Approved Closed
BC6
Cast in place concrete form work inspection for RC column first floor Approved w/
3610 KHEP-CI-3610
coverage inside the grid line if K-N / 1-6 Cluster 66 A6
Cluster 66 A6 NA Division 3 8-Feb-2018 10-Feb-2018 10:40 AM 11-Feb-2018 B comments
Closed
3613 KHEP-CI-3613 Cast in place concrete for RC column first floor Cluster 60 B2 Cluster 60 B2 NA Division 3 8-Feb-2018 10-Feb-2018 9:30 AM 11-Feb-2018 A Approved Closed
Second coat dam proofing installation inspection for CMU mortar &
Cluster 47
3614 KHEP-CI-3614 masonry inspection under exterior reinforced grade beam Cluster 47
BC6
NA Division 7 8-Feb-2018 10-Feb-2018 1:30 PM 11-Feb-2018 A Approved Closed
BC6
Second coat dam proofing installation inspection for CMU mortar &
Cluster 49
3615 KHEP-CI-3615 masonry inspection under exterior reinforced grade beam Cluster 49
BC6
NA Division 7 8-Feb-2018 10-Feb-2018 1:35 PM 11-Feb-2018 A Approved Closed
BC6
Cast in place concrete form work inspection for grade beam Cluster
3616 KHEP-CI-3616
45 A6
Cluster 45 A6 NA Division 3 8-Feb-2018 10-Feb-2018 9:35 AM 13-Feb-2018 A Approved Closed
Installation of reinforcing steel bar & embedded item & form closure
3617 KHEP-CI-3617
inspection for RC grade beams Cluster 45 A6
Cluster 45 A6 NA Division 3 8-Feb-2018 10-Feb-2018 9:40 AM 13-Feb-2018 A Approved Closed
Cast in place concrete form work inspection for RC slabs & beams
3621 KHEP-CI-3621
roof floor Cluster 73 B2
Cluster 73 B2 NA Division 3 10-Feb-2018 11-Feb-2018 2:00 PM 12-Feb-2018 A Approved Closed
Second coat dam proofing installation for grade beam internal face
3623 KHEP-CI-3623
only inside the building Cluster 73 B2
Cluster 73 B2 NA Division 3 10-Feb-2018 11-Feb-2018 1:30 PM 12-Feb-2018 A Approved Closed
Second coat dam proofing installation for grade beam internal face
3624 KHEP-CI-3624
only inside the building Cluster 71 B2
Cluster 71 B2 NA Division 3 10-Feb-2018 11-Feb-2018 1:35 PM 12-Feb-2018 A Approved Closed
Concrete sampling testing & placement inspection for RC column Cluster 55 Approved w/
3625 KHEP-CI-3625
ground floor Cluster 55 BC4 BC4
NA Division 3 10-Feb-2018 11-Feb-2018 9:30 AM 13-Feb-2018 B comments
Closed
Cast in place concrete form work inspection for RC column first floor
3626 KHEP-CI-3626
column GL(2&N), GL(3&L,M,N), GL(5&K,L) Cluster 66 A6
Cluster 66 A6 NA Division 3 10-Feb-2018 11-Feb-2018 10:40 AM 12-Feb-2018 A Approved Closed
First coat dam proofing installation inspection for grade beam inside Approved w/
3627 KHEP-CI-3627
Cluster 33 B2
Cluster 33 B2 NA Division 7 10-Feb-2018 11-Feb-2018 10:00 AM 12-Feb-2018 B comments
Closed
First coat dam proofing installation inspection for CMU mortar &
3628 KHEP-CI-3628 masonry inspection under exterior reinforced grade beam Cluster 31 Cluster 31 B2 NA Division 7 10-Feb-2018 11-Feb-2018 10:00 AM 12-Feb-2018 A Approved Closed
B2
Dam proofing surface preparation for RC grade beam from inside Approved w/
3629 KHEP-CI-3629
Cluster 6 BC4
Cluster 6 BC4 NA Division 7 10-Feb-2018 11-Feb-2018 10:00 AM 12-Feb-2018 B comments
Closed
Cast in place concrete form work inspection for RC grade beam Cluster 41
3630 KHEP-CI-3630
Cluster 41 BC4 BC4
NA Division 3 10-Feb-2018 11-Feb-2018 10:00 AM 13-Feb-2018 A Approved Closed
Installation of reinforcing steel bar embedded item & form closure Cluster 41
3631 KHEP-CI-3631
inspection for RC graade beam Cluster 41 BC4 BC4
NA Division 3 10-Feb-2018 11-Feb-2018 10:00 AM 12-Feb-2018 A Approved Closed
Inspection form work & concrete pouring for sewer embedded Pice
3634 KHEP-CI-3634 at Manhole Zone 1B Line 1,2 MH-4-L01 MH-5-L02 MH-3-L02 one side Line 1, 2 Zone 1B Division 31 10-Feb-2018 11-Feb-2018 2:30 PM 13-Feb-2018 A Approved Closed
MH-6-L02 MH-2-L02 two side MH-2-A-L02 MH-1-L02 two side
Inspection for mwork & concrete pouring for sewer back drop pice
3635 KHEP-CI-3635 from IC to MH 160mm at manhole First Stage MH-2-L020 MH-2-A- Line 1 Zone 1B Division 31 10-Feb-2018 11-Feb-2018 11:30 AM 13-Feb-2018 A Approved Closed
L02 MH1-L02 Line 2 Zone 1B
Cast in place concrete form work inspection for RC slab on grade
3636 KHEP-CI-3636
Cluster 7 B2
Cluster 7 B2 NA Division 3 10-Feb-2018 11-Feb-2018 10:00 AM 13-Feb-2018 A Approved Closed
Installation of reinforcing steel bar embedded item & form closure Approved w/
3637 KHEP-CI-3637
inspection for RC slab on grade Cluster 7 B2
Cluster 7 B2 NA Division 3 10-Feb-2018 11-Feb-2018 10:00 AM 13-Feb-2018 B comments
Closed
Compaction test second coat layer for backfilling under slab on grade
3649 KHEP-CI-3649
axis A-E Cluster 11 B2
Cluster 11 B2 NA N/A 11-Feb-2018 12-Feb-2018 10:00 AM 13-Feb-2018 A Approved Closed
Concrete sampling testing & placement inspection for RC column first Cluster 23
3651 KHEP-CI-3651
floor Cluster 23 BC4 BC4
NA Division 3 12-Feb-2018 13-Feb-2018 9:00 AM 14-Feb-2018 A Approved Closed
3654 KHEP-CI-3654 Compaction test final layer under slab on grade Cluster 12 B2 Cluster 12 B2 NA Division 3 12-Feb-2018 13-Feb-2018 10:00 AM 14-Feb-2018 A Approved Closed
Concrete sampling testing & placement inspection for RC grade beam Cluster 42 Approved w/
3655 KHEP-CI-3655
Cluster 42 BC4 BC4
NA Division 3 12-Feb-2018 13-Feb-2018 9:00 AM 14-Feb-2018 B comments
Closed
Compaction test 1st & final layer selected fill bottom of foundation Plublic Toilet
3656 KHEP-CI-3656
Public Toilet B2 Zone 5A B2
Zone 5A Division 31 12-Feb-2018 13-Feb-2018 2:00 PM 14-Feb-2018 A Approved Closed
Cast in place concrete form work inspection for RC column neck Cluster 59
3658 KHEP-CI-3658
Cluster 59 BC6 BC6
NA Division 3 12-Feb-2018 13-Feb-2018 9:00 AM 14-Feb-2018 A Approved Closed
Installation of reinforcing steel bar embedded item & form closure Cluster 42
3659 KHEP-CI-3659
inspection for RC cloumn ground floor Cluster 42 BC4 BC4
NA Division 3 12-Feb-2018 13-Feb-2018 10:00 AM 14-Feb-2018 A Approved Closed
Cast in place concrete formwork inspection for RC first floor slab & Cluster 22
3660 KHEP-CI-3660
stairs Cluster 22 BC4 BC4
NA Division 3 12-Feb-2018 13-Feb-2018 10:00 AM 19-Feb-2018 A Approved Closed
Installation of reinforcing steel bar embedded item & form closure Cluster 22
3661 KHEP-CI-3661
inspection for RC first floor slab & stairs Cluster 22 BC4 BC4
NA Division 3 12-Feb-2018 13-Feb-2018 10:00 AM 19-Feb-2018 A Approved Closed
Cast in place concrete formwork inspection for RC first floor slab &
3667 KHEP-CI-3667
stair Cluster 43 A6
Cluster 43 A6 NA Division 3 13-Feb-2018 14-Feb-2018 10:00 AM 14-Feb-2018 A Approved Closed
Installation of reinforcing steel bar embedded item & form closure
3668 KHEP-CI-3668
inspection for RC first floor slab & stairs Cluster 43 A6
Cluster 43 A6 NA Division 3 13-Feb-2018 14-Feb-2018 10:00 AM 14-Feb-2018 A Approved Closed
Concrete sampling testing & placement inspection for RC column first Approved w/
3673 KHEP-CI-3673
floor coverage grid line K-N / 1-6 Cluster 66 A6
Cluster 66 A6 NA Division 3 13-Feb-2018 14-Feb-2018 9:30 AM 14-Feb-2018 B comments
Closed
Compaction test around footing general fill 5th layer Zone 2B Cluster Cluster 28
3674 KHEP-CI-3674
28 BC4 BC4
Zone 2B Division 31 13-Feb-2018 14-Feb-2018 9:30 AM 14-Feb-2018 A Approved Closed
Compaction test around footing general fill 4th layer Zone 3B Cluster Cluster 49
3675 KHEP-CI-3675
49 BC6 BC6
Zone 3B Division 31 13-Feb-2018 14-Feb-2018 9:30 AM 14-Feb-2018 A Approved Closed
Inspection formwork & concrete pouring for sewer back drop pice
3677 KHEP-CI-3677 from IC to MH 160mm at manhole second stage MH-2-L02 MH-2-A- Line 2 Zone 1B Division 31 13-Feb-2018 14-Feb-2018 2:30 PM 17-Feb-2018 E Rejected Closed
L02 MH-1-L02 MH-6-L02 Zone 1B Line 2
Inspection formwork & concrete pouring for sewer back drop pice
3677.1 KHEP-CI-3677-01 from IC to MH 160mm at manhole second stage MH-2-L02 MH-2-A- Line 2 Zone 1B Division 31 19-Feb-2018 20-Feb-2018 2:30 PM Open
L02 MH-1-L02 MH-6-L02 Zone 1B Line 2
Concrete sampling testing & placement inspection for RC roof slab Approved w/
3679 KHEP-CI-3679
Cluster 33 B2
Cluster 33 B2 NA Division 3 14-Feb-2018 15-Feb-2018 11:00 AM 17-Feb-2018 B comments
Closed
Concrete sampling testing & placement inspection for RC grade beam Cluster 41 Approved w/
3680 KHEP-CI-3680
Cluster 41 BC4 BC4
NA Division 3 14-Feb-2018 15-Feb-2018 11:00 AM 17-Feb-2018 B comments
Closed
Compaction test around footing general fill final layer Zone 2B Cluster 29
3687 KHEP-CI-3687
Cluster 29 BC4 BC4
Zone 2B Division 31 14-Feb-2018 15-Feb-2018 9:30 AM 17-Feb-2018 A Approved Closed
Compaction test around footing general fill 3rd layer Zone 3B Cluster Cluster 62
3688 KHEP-CI-3688
62 BC6 BC6
Zone 3B Division 31 14-Feb-2018 15-Feb-2018 11:30 AM 17-Feb-2018 A Approved Closed
Compaction test around footing general fill 5th layer Zone 2B Cluster Cluster 39
3689 KHEP-CI-3689
39 BC6 BC6
Zone 2B Division 31 14-Feb-2018 15-Feb-2018 11:30 AM 17-Feb-2018 A Approved Closed
Inspection formwork for base & wall & concrete pouring for storm
Approved w/
3691 KHEP-CI-3691 manholes precast yard MH-137-L40 MH-108-L27 MH-76-L18 Zone Line 18,27,40 Zone 3B,4B,5C Division 33 14-Feb-2018 15-Feb-2018 10:00 AM 20-Feb-2018 B comments
Closed
3B,4B,5C Line 18,27,40
Inspection reinforcement steel bar for cover slab & concrete pouring
for storm manholes precast yard MH-29a-L07 MH29-L07 MH54-L15
3692 KHEP-CI-3692
MH-55-L15 MH56-L15 MH57-L15 MH-58-L15 MH44-L14 MH-43-L14
Line 7,14,15 Zone 1B,2B Division 33 14-Feb-2018 15-Feb-2018 10:30 AM 18-Feb-2018 A Approved Closed
Zone 1B,2B Line 7,14,15
Check the survey work elevation & coordinate for blinding of footing
3693 KHEP-CI-3693
Public Toilet Type A-PTA
Public Toilet Type A-PTA Division 3 14-Feb-2018 15-Feb-2018 2:00 PM 17-Feb-2018 A Approved Closed
Cast in place concrete sampling form work inspection for RC slab first Cluster 50
3694 KHEP-CI-3694
floor & 2nd flight stair Cluster 50 BC4 BC4
NA Division 3 15-Feb-2018 17-Feb-2018 10:00 AM 19-Feb-2018 A Approved Closed
Installation of reinforcing steel bar embedded item & form closure Cluster 50
3695 KHEP-CI-3695
inspection for RC slab first floor & 2nd flight stair Cluster 50 BC4 BC4
NA Division 3 15-Feb-2018 17-Feb-2018 10:30 AM 18-Feb-2018 A Approved Closed
Concrete sampling testing & placement inspection for RC grade beam Cluster 26 Approved w/
3697 KHEP-CI-3697
Cluster 26 BC4 BC4
NA Division 3 15-Feb-2018 17-Feb-2018 11:00 AM 18-Feb-2018 B comments
Closed
Installation of reinforcing steel bar embedded item & form closure Cluster 26
3701 KHEP-CI-3701
inspection for RC cloumn ground floor Cluster 26 BC4 BC4
NA Division 3 15-Feb-2018 17-Feb-2018 10:00 AM 18-Feb-2018 A Approved Closed
70cm CMU morter & masonry inspection under exterior reinforced Cluster 38 Approved w/
3702 KHEP-CI-3702
grade beam Cluster 38 BC6 BC6
NA Division 4 15-Feb-2018 17-Feb-2018 2:00 PM 19-Feb-2018 B comments
Closed
Installation for sewer GRP manholes sewer main line MH-4-L27 MH-
3707 KHEP-CI-3707
5-L27 MH-1-A-L09 Line 09,27 Zone 2B
Line 09,27 Zone 2B Division 31 15-Feb-2018 17-Feb-2018 10:30 AM 19-Feb-2018 A Approved Closed
Compaction test around footing general fill final layer Zone 3B Cluster 49
3708 KHEP-CI-3708
Cluster 49 BC6 BC6
Zone 3B Division 31 15-Feb-2018 17-Feb-2018 9:30 AM 19-Feb-2018 A Approved Closed
Compaction test around footing general fill final layer Zone 2B Cluster 28
3709 KHEP-CI-3709
Cluster 28 BC4 BC4
Zone 2B Division 31 15-Feb-2018 17-Feb-2018 10:30 AM 19-Feb-2018 A Approved Closed
Inspection form work & concrete pouring for sewer embedded pice
at manhole MH-15-L01 MH5-L01 MH-4-L01 MH-3-L12 one side MH-
3710 KHEP-CI-3710
14-L01 MH-12-L01 MH-9-L01 three side MH-13-L01 MH-11-L01 MH-
Line 1 Zone 1B Division 31 15-Feb-2018 17-Feb-2018 2:30 PM 19-Feb-2018 A Approved Closed
10-L01 MH-2-L12 MH-1-L12 two side Zone 1B Line 1
Dam proofong surface preparation for RC foundation & column neck Cluster 32
3711 KHEP-CI-3711
Cluster 32 BC6 BC6
NA Division 07 15-Feb-2018 17-Feb-2018 10:40 AM 18-Feb-2018 A Approved Closed
Cast in place concretee form work inspection for RC column ground Cluster 41
3715 KHEP-CI-3715
floor axis A-J / 1-6 Cluster 41 BC4 BC4
NA Division 3 15-Feb-2018 17-Feb-2018 1:20 PM 19-Feb-2018 A Approved Closed
Concrete sampling testing & placement inspection for RC first floor Approved w/
3716.1 KHEP-CI-3716-01
slab & stair Cluster 43 A6
Cluster 43 A6 NA Division 3 19-Feb-2018 20-Feb-2018 9:00 AM 20-Feb-2018 B comments
Closed
Blinding concrete sampling testing & placement inspection for footing Approved w/
3717 KHEP-CI-3717
Public Toilet PTA Type A
Public Toilet Type A-PTA Division 3 17-Feb-2018 18-Feb-2018 10:00 AM 19-Feb-2018 B comments
Closed
Check the survey work elevation & coordinate for blinding of grade Cluster 29
3721 KHEP-CI-3721
beam Cluster 29 BC4 BC4
NA Division 3 17-Feb-2018 18-Feb-2018 2:00 PM 19-Feb-2018 A Approved Closed
Concrete sampling testing & placement inspection for RC column Cluster 59 Approved w/
3725 KHEP-CI-3725
neck Cluster 59 BC6 BC6
NA Division 3 17-Feb-2018 18-Feb-2018 9:30 AM 19-Feb-2018 B comments
Closed
Cast in place concrete formwork inspection for RC roof slab Cluster Approved w/
3727 KHEP-CI-3727
04 A6
Cluster 04 A6 NA Division 3 18-Feb-2018 19-Feb-2018 10:00 AM 19-Feb-2018 E comments
Closed
Installation of reinforcing steel bar embedded item & form closure Approved w/
3728 KHEP-CI-3728
inspection for RC roof slab Cluster 04 A6
Cluster 04 A6 NA Division 3 18-Feb-2018 19-Feb-2018 10:00 AM 19-Feb-2018 E comments
Closed
Cast in place concrete formwork inspection for RC first floor slab & Cluster 24
3729 KHEP-CI-3729
stair Cluster 24 BC4 BC4
NA Division 3 18-Feb-2018 19-Feb-2018 10:00 AM 20-Feb-2018 A Approved Closed
Installation of reinforcing steel bar embedded item & form closure Cluster 24
3730 KHEP-CI-3730
inspection for RC first floor slab & stair Cluster 24 BC4 BC4
NA Division 3 18-Feb-2018 19-Feb-2018 10:00 AM 20-Feb-2018 A Approved Closed
Cast in place concrete formwork inspection for RC roof slab Cluster Cluster 21
3731 KHEP-CI-3731
21 BC4 BC4
NA Division 3 18-Feb-2018 19-Feb-2018 10:00 AM 20-Feb-2018 A Approved Closed
Installation of reinforcing steel bar embedded item & form closure Cluster 21
3732 KHEP-CI-3732
inspection for RC roof slab Cluster 21 BC4 BC4
NA Division 3 18-Feb-2018 19-Feb-2018 10:00 AM 20-Feb-2018 A Approved Closed
Compaction tedt first layer pre final layer for backfilling under slab on
3733 KHEP-CI-3733
grade axis A-E / 3-6 Cluster 19 B2
Cluster 19 B2 NA Division 3 18-Feb-2018 19-Feb-2018 1:30 PM 19-Feb-2018 A Approved Closed
Compaction tedt first layer pre final layer for backfilling under slab on
3734 KHEP-CI-3734
grade axis A-E / 3-6 Cluster 20 B2
Cluster 20 B2 NA Division 3 18-Feb-2018 19-Feb-2018 1:30 PM 19-Feb-2018 A Approved Closed
Compaction tedt first layer pre final layer for backfilling under slab on
3735 KHEP-CI-3735
grade axis A-E / 3-6 Cluster 16 B2
Cluster 16 B2 NA Division 3 18-Feb-2018 19-Feb-2018 1:30 PM 19-Feb-2018 A Approved Closed
Check the survey work elevation & cordinate for blinding of grade Cluster 28
3740 KHEP-CI-3740
beam Cluster 28 BC4 BC4
NA Division 3 18-Feb-2018 19-Feb-2018 2:00 PM 19-Feb-2018 A Approved Closed
Cast in place concrete formwork inspection for RC column first floor Approved w/
3741 KHEP-CI-3741
axis H-N Cluster 43 B2
Cluster 43 B2 NA Division 3 18-Feb-2018 19-Feb-2018 2:00 PM 20-Feb-2018 B comments
Closed
Concrete sampling testing & placement inspection for RC column Cluster 41 Approved w/
3742 KHEP-CI-3742
ground floor Cluster 41 BC4 BC4
NA Division 3 18-Feb-2018 19-Feb-2018 9:00 AM 20-Feb-2018 B comments
Closed
Cast in place concrete form work inspection for RC grade beams Cluster 56
3747 KHEP-CI-3747
Cluster 56 BC4 BC4
NA Division 3 19-Feb-2018 20-Feb-2018 10:30 AM 20-Feb-2018 A Approved Closed
Installation of reinforcing steel bar embedded item & form closure Cluster 56
3748 KHEP-CI-3748
inspection for RC grade beams Cluster 56 BC4 BC4
NA Division 3 19-Feb-2018 20-Feb-2018 10:35 AM 20-Feb-2018 A Approved Closed
Cast in place concrete form work inspection for RC column first floor
3749 KHEP-CI-3749
Cluster 63 B2
Cluster 63 B2 NA Division 3 19-Feb-2018 20-Feb-2018 11:00 AM 20-Feb-2018 A Approved Closed
Check the survey work elevation & coordinate for blinding under Cluster 49
3750 KHEP-CI-3750
grade beam Cluster 49 BC6 BC6
NA Division 1 19-Feb-2018 20-Feb-2018 10:00 AM 20-Feb-2018 A Approved Closed
Concrete sampling testing & placement inspection for RC column Cluster 26 Approved w/
3752 KHEP-CI-3752
ground floor Cluster 26 BC4 BC4
NA Division 3 19-Feb-2018 20-Feb-2018 11:00 AM 20-Feb-2018 B comments
Closed
Compaction test first layer pre final layer for back filling under slab
3753 KHEP-CI-3753
on grade axis A-E / 3-6 Cluster 08 B2
Cluster 08 B2 NA Division 3 19-Feb-2018 20-Feb-2018 10:00 AM 20-Feb-2018 A Approved Closed
Compaction test first layer pre final layer for back filling under slab
3754 KHEP-CI-3754
on grade axis A-E / 3-6 Cluster 17 B2
Cluster 17 B2 NA Division 3 19-Feb-2018 20-Feb-2018 10:00 AM 20-Feb-2018 A Approved Closed
Cast in place concrete form work inspection for RC first floor slab & Cluster 25 Approved w/
3755 KHEP-CI-3755
stair Cluster 25 BC4 BC4
NA Division 3 19-Feb-2018 20-Feb-2018 11:00 AM 24-Feb-2018 B comments
Closed
Installation of reinforcing steel bar embedded item & form closure Cluster 25
3756 KHEP-CI-3756
inspection for RC first floor slab & stair Cluster 25 BC4 BC4
NA Division 3 19-Feb-2018 20-Feb-2018 11:00 AM 24-Feb-2018 A Approved Closed
Cast in place concrete form work inspection for RC roof slab Cluster Cluster 09 Approved w/
3757 KHEP-CI-3757
09 BC4 BC4
NA Division 3 19-Feb-2018 20-Feb-2018 11:00 AM 21-Feb-2018 B comments
Closed
Installation of reinforcing steel bar embedded item & form closure Cluster 09 Approved w/
3758 KHEP-CI-3758
inspection for RC roof slab Cluster 09 BC4 BC4
NA Division 3 19-Feb-2018 20-Feb-2018 11:00 AM 21-Feb-2018 B comments
Closed
Inspection of pre back filling for around manholes sewer main line
3759 KHEP-CI-3759 Zone 1B Line 01,02 MH-6-L02 MH-7-L02 MH-5-L02 MH-2-A-L02 MH- Line 01,02 Zone 1B Division 31 19-Feb-2018 20-Feb-2018 11:00 AM 21-Feb-2018 A Approved Closed
2-L02 MH-1-L02
Compaction test around footing general fill final layer Zone 2B Cluster 39
3760 KHEP-CI-3760
Cluster 39 BC6 BC6
Zone 2B Division 31 19-Feb-2018 20-Feb-2018 11:30 AM 21-Feb-2018 A Approved Closed
Installation in reinforcing dteel bar embedded item & form closure Cluster 40 Approved w/
3761 KHEP-CI-3761
inspection for RC grade beam Cluster 40 BC4 BC4
NA Division 3 19-Feb-2018 20-Feb-2018 1:30 PM 24-Feb-2018 B comments
Closed
Compaction test around footing general fill 3rd layer Zone 2B Cluster
3762 KHEP-CI-3762
31 B2
Cluster 31 B2 Zone 2B Division 31 19-Feb-2018 20-Feb-2018 10:30 AM 20-Feb-2018 A Approved Closed
Compaction test around footing general fill 1st layer Zone 3B Cluster Cluster 47
3763 KHEP-CI-3763
47 BC6 BC6
Zone 3B Division 31 19-Feb-2018 20-Feb-2018 10:30 AM 20-Feb-2018 A Approved Closed
Cast in place concrete form work inspection for RC slab on grade Approved w/
3768 KHEP-CI-3768
Cluster 12 B2
Cluster 12 B2 NA Division 3 19-Feb-2018 20-Feb-2018 1:30 PM 24-Feb-2018 B comments
Closed
Installation in reinforcing steel bar embedded item & form closure Approved w/
3769 KHEP-CI-3769
inspection for RC slab on grade Cluster 12 B2
Cluster 12 B2 NA Division 3 19-Feb-2018 20-Feb-2018 1:30 PM 24-Feb-2018 B comments
Closed
Installation in reinforcing dteel bar embedded item & form closure Cluster 40
3770 KHEP-CI-3770
inspection for RC grade beam Cluster 40 BC4 BC4
NA Division 3 19-Feb-2018 20-Feb-2018 1:30 PM 24-Feb-2018 A Approved Closed
Termite control surface preparation installation & final inspection for Cluster 69
3772 KHEP-CI-3772
grade beams Cluster 69 BC6 BC6
NA Division 3 20-Feb-2018 21-Feb-2018 9:30 AM 21-Feb-2018 A Approved Closed
Cast in place concrete form work inspection for RC stairs first flight Cluster 55
3773 KHEP-CI-3773
Cluster 55 BC4 BC4
NA Division 3 20-Feb-2018 21-Feb-2018 10:30 AM 21-Feb-2018 A Approved Closed
Installation in reinforcing steel bar embedded item & form closure Cluster 55
3774 KHEP-CI-3774
inspection for RC stairs first flight Cluster 55 BC4 BC4
NA Division 3 20-Feb-2018 21-Feb-2018 10:45 AM 21-Feb-2018 A Approved Closed
Termite control surface preparation installation & final inspection for Cluster 28
3776 KHEP-CI-3776
grade beam Cluster 28 BC4 BC4
NA Division 3 20-Feb-2018 21-Feb-2018 9:00 AM 21-Feb-2018 A Approved Closed
Termite control surface preparation installation & final inspection for Cluster 29
3777 KHEP-CI-3777
grade beam Cluster 29 BC4 BC4
NA Division 3 20-Feb-2018 21-Feb-2018 9:00 AM 21-Feb-2018 A Approved Closed
Blinding concrete sampling testing & placement inspection for grade Cluster 28
3778 KHEP-CI-3778
beam Cluster 28 BC4 BC4
NA Division 3 20-Feb-2018 21-Feb-2018 10:00 AM 21-Feb-2018 A Approved Closed
Blinding concrete sampling testing & placement inspection for grade Cluster 29
3779 KHEP-CI-3779
beam Cluster 29 BC4 BC4
NA Division 3 20-Feb-2018 21-Feb-2018 10:00 AM 21-Feb-2018 A Approved Closed
Concrete sampling testing & placement inspection for RC column Cluster 36 Approved w/
3780 KHEP-CI-3780
ground floor Cluster 36 BC4 BC4
NA Division 3 20-Feb-2018 21-Feb-2018 11:00 AM 21-Feb-2018 B comments
Closed
3782 KHEP-CI-3782 Compaction test final layer under slan on grade Cluster 20 B2 Cluster 20 B2 NA Division 3 20-Feb-2018 21-Feb-2018 10:00 AM 21-Feb-2018 A Approved Closed
Inspection of pre back filling for around manhole storm main line
3783 KHEP-CI-3783
MH-54-L15 Zone 1B Line 15
Line 15 Zone 1B Division 31 20-Feb-2018 21-Feb-2018 11:00 AM 24-Feb-2018 A Approved Closed
3787 KHEP-CI-3787 Compaction test final layer under slab on grade Cluster 19 B2 Cluster 19 B2 NA Division 3 20-Feb-2018 21-Feb-2018 10:00 AM 21-Feb-2018 A Approved Closed
Concrete sampling testing & placement inspection for RC first floor Cluster 24 Approved w/
3788 KHEP-CI-3788
slab & stair Cluster 24 BC4 BC4
NA Division 3 21-Feb-2018 22-Feb-2018 11:00 AM 24-Feb-2018 B comments
Closed
Concrete sampling testing & placement inspection for RC first floor Cluster 22 Approved w/
3789 KHEP-CI-3789
slab & stair Cluster 22 BC4 BC4
NA Division 3 21-Feb-2018 22-Feb-2018 11:00 AM 24-Feb-2018 B comments
Closed
Installation in reinforcing steel bar embedded item & form closure Cluster 22
3790 KHEP-CI-3790
inspection for RC column first floor Cluster 22 BC4 BC4
NA Division 3 21-Feb-2018 22-Feb-2018 2:00 PM 24-Feb-2018 A Approved Closed
Installation in reinforcing steel bar embedded item & form closure Cluster 24
3791 KHEP-CI-3791
inspection for RC column first floor Cluster 24 BC4 BC4
NA Division 3 21-Feb-2018 22-Feb-2018 2:00 PM 24-Feb-2018 A Approved Closed
Installation in reinforcing steel bar embedded item & form closure Cluster 34
3794 KHEP-CI-3794
inspection for RC roof floor Cluster 34 BC4 BC4
NA Division 3 21-Feb-2018 22-Feb-2018 10:00 AM 24-Feb-2018 A Approved Closed
Installation in reinforcing steel bar embedded item & form closure Cluster 50
3796 KHEP-CI-3796
inspection for RC column first floor Cluster 50 BC4 BC4
NA Division 3 21-Feb-2018 22-Feb-2018 9:00 AM 24-Feb-2018 A Approved Closed
Cast in place concrete form work inspection for RC slab first floor & Approved w/
3797 KHEP-CI-3797
second flight stair Cluster 64 B2
Cluster 64 B2 NA Division 3 21-Feb-2018 22-Feb-2018 10:30 AM 24-Feb-2018 B comments
Closed
Compaction test final layer under slab on grade axis A-J / 3-6 Cluster Cluster 16 Approved w/
3799 KHEP-CI-3799
16 BC4 BC4
NA Division 3 21-Feb-2018 22-Feb-2018 10:00 AM 24-Feb-2018 B comments
Closed
Inspection of pre back filling around manhole sewer main line MH-5-
3800 KHEP-CI-3800
L01 MH-4-L01 Line 01 Zone 1B
Line 01 Zone 1B Division 31 21-Feb-2018 22-Feb-2018 11:00 AM 24-Feb-2018 E Rejected Closed
Compaction test around footing general fill final layer Zone 3B Cluster 47
3801 KHEP-CI-3801
Cluster 47 BC6 BC6
Zone 3B Division 31 21-Feb-2018 22-Feb-2018 10:30 AM 25-Feb-2018 A Approved Closed
Cluster 18 BC
3813 KHEP-CI-3813 Cast in Place concrete formwork inspection for RC roof slab
4
NA Division 03 22-Feb-2018 24-Feb-2018 10:00 AM 25-Feb-2018 A Approved Closed
Installation of reinforcing steel bar embedded item and form closure Cluster 18 BC
3814 KHEP-CI-3814
inspection for RC roof slab 4
NA Division 03 22-Feb-2018 24-Feb-2018 10:00 AM 25-Feb-2018 A Approved Closed
70cm CMU Morter & Masonry Inspection Under Exterior Reinforced Cluster 62 BC
3815 KHEP-CI-3815
Grade Beam 6
NA Division 03 22-Feb-2018 24-Feb-2018 10:30 AM 25-Feb-2018 A Approved Closed
3816 KHEP-CI-3816 Compaction test final layer under slab on grade axis (A-E/ 3-6) Cluster 17 B2 NA Division 03 22-Feb-2018 24-Feb-2018 10:00 AM 25-Feb-2018 A Approved Closed
Cluster 22 BC
3817 KHEP-CI-3817 Cast in place concrete formwork inspection for RC Column first floor
4
NA Division 03 22-Feb-2018 24-Feb-2018 2:00 PM 25-Feb-2018 A Approved Closed
Inspection formwork and concrete pouring for sewer Back Drop From
3820 KHEP-CI-3820
IC to MH 160mm at Man Hole (First stage)
Line 02 Zone 2B Division 31 22-Feb-2018 24-Feb-2018 2:30 PM 25-Feb-2018 A Approved Closed
Concrete samling testing & placement inspection for RC Stairs First Cluster 55 Approved w/
3825 KHEP-CI-3825
Flight Cluster 55 BC4 BC4
NA Division 03 24-Feb-2018 25-Feb-2018 9:30 AM 25-Feb-2018 B comments
Closed
Cast in place concrete formwork inspection for RC column First Floor Cluster 50
3826 KHEP-CI-3826
Cluster 50 BC4 BC4
NA Division 03 24-Feb-2018 25-Feb-2018 11:00 PM 25-Feb-2018 A Approved Closed
Concrete samling testing & placement inspection for RC Roof Slab Approved w/
3827 KHEP-CI-3827
Cluster 9 BC4
Cluster 9 BC4 NA Division 03 24-Feb-2018 25-Feb-2018 11:00 PM 25-Feb-2018 B comments
Closed
Concrete samling testing & placement inspection for RC First Floor Cluster 25 Approved w/
3828 KHEP-CI-3828
Slab & Stair Cluster 25 BC4 BC4
NA Division 03 24-Feb-2018 25-Feb-2018 11:00 PM 26-Feb-2018 B comments
Closed
Concrete samling testing & placement inspection for RC Roof Slab Approved w/
3829 KHEP-CI-3829
Cluster 30 B2
Cluster 30 B2 NA Division 03 24-Feb-2018 25-Feb-2018 11:00 PM 26-Feb-2018 B comments
Closed
Installation of reinforcing steel bar embedded item and form closure Cluster 25
3830 KHEP-CI-3830
inspection for RC Column (First Floor) Cluster 25 BC4 BC4
NA Division 03 24-Feb-2018 25-Feb-2018 10:00 PM 26-Feb-2018 A Approved Closed
Compaction test first Layer - pre Final layer for Backfilling under
3831 KHEP-CI-3831
slabon grade axis (B-D)/(1-3) Cluster 17 B2
Cluster 17 B2 NA Division 03 24-Feb-2018 25-Feb-2018 10:00 PM 26-Feb-2018 A Approved Closed
Compaction test first Layer - pre Final layer for Backfilling under
3832 KHEP-CI-3832
slabon grade axis (A-E)/(3-6) Cluster 17 B2
Cluster 27 B2 NA Division 03 24-Feb-2018 25-Feb-2018 10:00 PM 26-Feb-2018 A Approved Closed
Compaction test final layer under slab on grade axis (A-E/ 3-6)
3833 KHEP-CI-3833
Cluster 8 B2
Cluster 8 B2 NA Division 03 24-Feb-2018 25-Feb-2018 10:00 PM 26-Feb-2018 A Approved Closed
Cast in place concrete inspection for RC column Neck Public Toilet - Toilet - PTA-
3834 KHEP-CI-3834
PTA- Type A Type A
NA Division 03 24-Feb-2018 25-Feb-2018 10:00 PM 25-Feb-2018 A Approved Closed
Installation of reinforcing steel bar embedded item and form closure Cluster 29
3836 KHEP-CI-3836
inspection for RC Grade Beam Cluster 29 BC4 BC4
NA Division 03 24-Feb-2018 25-Feb-2018 10:00 PM 25-Feb-2018 A Approved Closed
Termite control surface preparation installation & final inspection for Approved w/
3840 KHEP-CI-3840
slab on grade axis A-E/3-6 Cluster 19 B2
Cluster 19 B2 NA Division 03 25-Feb-2018 26-Feb-2018 9:00 AM 27-Feb-2018 B comments
Closed
Termite control surface preparation installation & final inspection for Approved w/
3841 KHEP-CI-3841
slab on grade axis A-E/3-6 Cluster 20 B2
Cluster 20 B2 NA Division 03 25-Feb-2018 26-Feb-2018 9:00 AM 27-Feb-2018 B comments
Closed
Termite control surface preparation installation & final inspection for Cluster 16 Approved w/
3842 KHEP-CI-3842
slab on grade axis A-J/3-6 Cluster 16 BC4 BC4
NA Division 03 25-Feb-2018 26-Feb-2018 9:00 AM 27-Feb-2018 B comments
Closed
Compaction test first layer pre final layer for backfilling under slab on
3843 KHEP-CI-3843
grade axis B-D/1-3 Cluster 19 B2
Cluster 19 B2 NA Division 03 25-Feb-2018 26-Feb-2018 10:00 AM 27-Feb-2018 A Approved Closed
Compaction test first layer pre final layer for backfilling under slab on
3844 KHEP-CI-3844
grade axis B-D/1-3 Cluster 20 B2
Cluster 20 B2 NA Division 03 25-Feb-2018 26-Feb-2018 10:00 AM 27-Feb-2018 A Approved Closed
Compaction test first layer pre final layer for backfilling under slab on
3845 KHEP-CI-3845
grade axis B-D/1-3 Cluster 08 B2
Cluster 08 B2 NA Division 03 25-Feb-2018 26-Feb-2018 10:00 AM 27-Feb-2018 A Approved Closed
Concrete sampling testing & placement inspection for RC slab first Approved w/
3846 KHEP-CI-3846
floor & second flight stair Cluster 64 B2
Cluster 64 B2 NA Division 03 25-Feb-2018 26-Feb-2018 9:30 AM 27-Feb-2018 B comments
Closed
Cast in place concrete dormwork inspection for RC first floor slab & Cluster 42
3854 KHEP-CI-3854
stair Cluster 42 BC4 BC4
NA Division 3 25-Feb-2018 26-Feb-2018 9:00 AM 27-Feb-2018 A Approved Closed
Installation of reinforcing steel bar embedded item & form closure Cluster 42
3855 KHEP-CI-3855
inspection for RC first floor slab & stair Cluster 42 BC4 BC4
NA Division 3 25-Feb-2018 26-Feb-2018 9:00 AM 27-Feb-2018 A Approved Closed
Installation of reinforcing steel bar embedded item & form closure Cluster 56
3856 KHEP-CI-3856
inspection for RC column ground floor Cluster 56 BC4 BC4
NA Division 3 26-Feb-2018 27-Feb-2018 11:00 AM 27-Feb-2018 A Approved Closed
Cast in place concrete formwork inspection for RC Roof slab Cluster Cluster 23
3862 KHEP-CI-3862
23 BC4 BC4
NA Division 3 26-Feb-2018 27-Feb-2018 1:30 PM 28-Feb-2018 A Approved Closed
Installation of reinforcing steel bar embedded item & form closure Cluster 23
3863 KHEP-CI-3863
inspection for RC Roof slab Cluster 23 BC4 BC4
NA Division 3 26-Feb-2018 27-Feb-2018 1:30 PM 28-Feb-2018 A Approved Closed
Installation of reinforcing steel bar embedded item & form closure Cluster 28
3865 KHEP-CI-3865
inspection for RC grade beam Cluster 28 BC4 BC4
NA Division 3 26-Feb-2018 27-Feb-2018 2:00 PM 27-Feb-2018 A Approved Closed
Concrete sampling testing & placement inspection for RC roof slab Cluster 18
3866 KHEP-CI-3866
Cluster 18 BC4 BC4
NA Division 3 26-Feb-2018 27-Feb-2018 11:00 AM 27-Feb-2018 A Approved Closed
Concrete sampling testing & placement inspection for RC grade beam Cluster 29
3867 KHEP-CI-3867
Cluster 29 BC4 BC4
NA Division 3 26-Feb-2018 27-Feb-2018 11:00 AM 27-Feb-2018 A Approved Closed
Concrete sampling testing & placement inspection for RC column first
3868 KHEP-CI-3868
floor Cluster 43 A6
Cluster 43 A6 NA Division 3 26-Feb-2018 27-Feb-2018 11:00 AM 27-Feb-2018 E Rejected Closed
Concrete sampling testing & placement inspection for RC grade beam Cluster 40 Approved w/
3869 KHEP-CI-3869
Cluster 40 BC4 BC4
NA Division 3 26-Feb-2018 27-Feb-2018 11:00 AM 27-Feb-2018 B comments
Closed
Installation of reinforcing steel bar embedded item & form closure Cluster 29
3871 KHEP-CI-3871
inspection for RC column ground floor Cluster 29 BC4 BC4
NA Division 3 26-Feb-2018 27-Feb-2018 10:00 AM 27-Feb-2018 A Approved Closed
Inspection of pre back filling around manhole sewer main line MH-6-
3872 KHEP-CI-3872 Line 01 Zone 1B Division 31 26-Feb-2018 27-Feb-2018 11:00 AM Open
L01 MH-10-L01 MH-11-L01 MH-12-L01 Zone 1B Line 01
Inspection of excavated & compaction formation for sewer manholes
3873 KHEP-CI-3873
sewer main line MH-1-A-L22 Zone 4B Line 22
Line 22 Zone 4B Division 31 26-Feb-2018 27-Feb-2018 11:30 AM 28-Feb-2018 A Approved Closed
Compaction test first layer pre final layer for back filling under slab Cluster 09 Approved w/
3876 KHEP-CI-3876
on grade axis A-J 3-6 Cluster 09 BC4 BC4
NA Division 3 26-Feb-2018 27-Feb-2018 10:00 AM 28-Feb-2018 B comments
Closed
Concrete sampling testing & placement inspection for RC column first Cluster 50
3877 KHEP-CI-3877 NA Division 3 27-Feb-2018 28-Feb-2018 9:30 AM Open
floor Cluster 50 BC4 BC4
Cast in place concrete formwork inspection for RC slab & RC beams
3878 KHEP-CI-3878 Cluster 58 B2 NA Division 3 27-Feb-2018 28-Feb-2018 1:30 PM Open
roof floor Cluster 58 B2
Inspection of sand filling up to the pipe & laying warning tape around
3888 KHEP-CI-3888 Line 01 Zone 1B Division 31 27-Feb-2018 28-Feb-2018 11:00 AM Open
manhole sewer main line MH-7-L01 Zone 1B Line 01
Inspection of pre back filling around manhole sewer mian line MH-
3889 KHEP-CI-3889 Line 01 Zone 1B Division 31 27-Feb-2018 28-Feb-2018 11:00 AM Open
13-L01 MH-14-L01 Zone 1B Line 01
Inspection Formwork for base & wall and concrete pouring for Storm
Catch Basin Precast yard Zone 2B Line 21,27,22,30 20Pic CB-189
&CB-190 At MH-89-L22 And CB-197 & CB-198 At MH-91A-L22
AndCB-199 At MH-88-L22 CB-179 At MH-79-L21 AndCB-180&CB- Line
3890 KHEP-CI-3890 Zone 2B Division 33 27-Feb-2018 28-Feb-2018 9:00 AM Open
81&CB-82 At MH-108-L27AndCB-195 & CB-196 At MH-91-L22 CB- 21,27,22,30
183 & CB-184 at MH-107a-L30 & CB-185 & CB-186 at MH-107-L30
CB-191 & CB-192 & CB-193 At MH-90-L21 & CB-187&CB-188 at MH-
106-L30
Installation for sewer GRP manholes sewer main line MH-3-L27 MH-
3894 KHEP-CI-3894 Line 30,29,27 Zone 2B Division 31 27-Feb-2018 28-Feb-2018 10:30 AM Open
1-L30 MH-2-L30 MH-3-L30 MH-1-A-L29 Zone 2B Line 30,29,27
Installation inspection of precast storm drainage manholes MH-I4-
3895 KHEP-CI-3895 Line 02,07 Zone 2B Division 31 27-Feb-2018 28-Feb-2018 11:00 AM Open
L02 MH-I5-L02 MH-29-L07 MH-29a-L07 Zone 2B Line 02,07
Cast in place concrete formwork inspection for RC column first floor Cluster 24
3896 KHEP-CI-3896 NA Division 3 27-Feb-2018 28-Feb-2018 10:00 AM Open
Cluster 24 BC4 BC4
Installation of reinforcing steel bar embedded item & form closure Cluster 40
3897 KHEP-CI-3897 NA Division 3 27-Feb-2018 28-Feb-2018 10:00 AM Open
inspection for column ground floor Cluster 40 BC4 BC4
Concrete sampling testing & placement inspection for RC first floor Cluster 42
3898 KHEP-CI-3898 NA Division 3 28-Feb-2018 1-Mar-2018 11:00 AM Open
slab & stair Cluster 42 BC4 BC4
Installation of reinforcing steel bar embedded item & form closure Cluster 42
3899 KHEP-CI-3899 NA Division 3 28-Feb-2018 1-Mar-2018 11:00 AM Open
inspection for column first floor Cluster 42 BC4 BC4
Cast in place concrete formwork inspection for RC column ground Cluster 29
3900 KHEP-CI-3900 NA Division 3 28-Feb-2018 1-Mar-2018 1:30 PM Open
floor Cluster 29 BC4 BC4
Compaction test first layer pre final layer for backfilling under slab on Cluster 09
3901 KHEP-CI-3901 NA Division 3 28-Feb-2018 1-Mar-2018 11:00 AM Open
grade axis B-D / 1-3 & F-H / 1-3 Cluster 09 BC4 BC4
Compaction test first layer pre final layer for backfilling under slab on Cluster 16
3902 KHEP-CI-3902 NA Division 3 28-Feb-2018 1-Mar-2018 11:00 AM Open
grade axis B-D / 1-3 & F-H / 1-3 Cluster 16 BC4 BC4
Check the survey work elevation & coordination for building of grade Cluster 47
3903 KHEP-CI-3903 NA Division 3 28-Feb-2018 1-Mar-2018 9:30 AM Open
beams Cluster 47 BC6 BC6
Cast in place concrete formwork inspection for RC Slabs & Rc Beams Cluster 60
3904 KHEP-CI-3904 NA Division 3 28-Feb-2018 1-Mar-2018 10:30 AM Open
- Roof Floor Cluster 60 BC4 BC4
Installation of reinforcing steel bar embedded item & form closure Cluster 60
3905 KHEP-CI-3905 NA Division 3 28-Feb-2018 1-Mar-2018 10:40 AM Open
inspection for RC Slabs & Rc Beams - Roof Floor Cluster 60 BC4 BC4
Compaction test 1st & final layer structural fill selected fill bottom of Public Toilet
3906 KHEP-CI-3906 Zone 5B Division 31 28-Feb-2018 1-Mar-2018 11:00 AM Open
foundation Zone 5B Public Toilet B1 B1
Compaction test and formation existing level STA 0+225 to 0+337
3907 KHEP-CI-3907 Road 02 NA Division 31 28-Feb-2018 1-Mar-2018 9:30 AM Open
Road 02
ELECTRICAL
Inspect installation layout PVC Conduit Pipes, Fittings & Octagonal 10-05-2017 (11-
Cluster 69/B- 11-05-2017 9:30:00 AM Approved w/
001 KHEP-EL-0001 Steel Boxes for Lighting, Power & Fire Alarm system embedded for
02 (Mock-up)
05-2017-Recall)
15 may 2017 10:00 AM
17-May-2017 B comments
Closed
under slab 14 may 2017
Zone 4B /C- Approved w/
002 KHEP-EL-0002 Installation of Steel box for Switches at columns of C69
69 (B2)
21-May-2017 22-May-2017 9:00 AM 23-May-2017 B comments
Closed
Installation of PVC Conduit & Block-Out for Lighting and Power at Zone 1A, Approved w/
004 KHEP-EL-0004
Ground Floor Columns of Cluster 1
27-May-2017 28-May-2017 8:30 AM 28-May-2017 B comments
Closed
Installation of PVC Conduit & Block-Out for Ground Floor Socket Zone 1A, Approved w/
005 KHEP-EL-0005
Outlet and Lighting Switches at C-2 Columns Cluster 2
31-May-2017 1-Jun-2017 8:30 AM 3-Jun-2017 B comments
Closed
Installation of Galvanized Steel Box for Socket Outlet and Lighting Zone 1A,
006 KHEP-EL-0006
Switches at Ground Floor Columns of C-2 Cluster 2
4-Jun-2017 5-Jun-2017 8:30 AM 6-Jun-2017 E Rejected Closed
Installation of Galvanized Steel Box for Socket Outlet and Lighting Zone 1A, Approved w/
006.1 KHEP-EL-0006-01
Switches at Ground Floor Columns of C-2 Cluster 2
10-Jun-2017 11-Jun-2017 8:30 AM 15-Jun-2017 B comments
Closed
Installation of 110mm dia. PVC conduit from KWH going to Panel Zone 4B, Approved w/
007 KHEP-EL-0007
board at Ground floor Cluster 68
13-Jun-2017 14-Jun-2017 8:30 AM 15-Jun-2017 B comments
Closed
Installation of PVC conduits and GI boxes for First Floor and Roof
Approved w/
100 KHEP-EL-0100 Floor Lighting System at roof slab of Cluster 17 Cluster 17 Zone 1B Division 26 23-Oct-2017 24-Oct-2017 8:00 AM 25-Oct-2017 B comments
Closed
Zone 1B, Cluster 17
Installation of PVC conduit for Roof Socket Outlet at Roof Slab of
Approved w/
101 KHEP-EL-0101 Cluster 17 (Power) Cluster 17 Zone 1B Division 26 23-Oct-2017 24-Oct-2017 8:30 AM 25-Oct-2017 B comments
Closed
Zone 1B, Cluster 17
Installation of PVC conduits and GI boxes for First Floor and Roof
Approved w/
108 KHEP-EL-0108 Floor Lighting System at roof slab of Cluster 7 Zone 1B, Cluster 7 Zone 1B Division 26 29-Oct-2017 30-Oct-2017 8:20 AM 31-Oct-2017 B comments
Closed
Cluster 7
Installation of PVC conduit for roof Power socket outlet at roof slab of
Approved w/
109 KHEP-EL-0109 Cluster 7 Zone 1B, Cluster 7 Zone 1B Division 26 29-Oct-2017 30-Oct-2017 8:40 AM 31-Oct-2017 B comments
Closed
Cluster 7
Installation of PVC Conduit & Box for Lighting System in Ground floor
Approved w/
197 KHEP-EL-0197 at First Floor Slab in Cluster 9 Cluster 9 Zone 1B Division 26 12-Dec-2017 13-Dec-2017 9:00 AM 13-Dec-2017 B comments
Closed
Zone 1B, Cluster 9
Installation of PVC Conduit for Power System in First Floor slab in
Approved w/
198 KHEP-EL-0198 Cluster 9 Cluster 9 Zone 1B Division 26 12-Dec-2017 13-Dec-2017 9:15 AM 13-Dec-2017 B comments
Closed
Zone 1B, Cluster 9
Installation of PVC Conduit for Mechanical Power System in Ground
Approved w/
199 KHEP-EL-0199 Floor at First floor slab of Cluster 9 Cluster 9 Zone 1B Division 26 12-Dec-2017 13-Dec-2017 10:00 AM 13-Dec-2017 B comments
Closed
Zone 1B, Cluster 9
Installation of PVC Conduit for Mechanical Power System in Ground
Approved w/
200 KHEP-EL-0200 Floor at First floor slab of Cluster 52 Cluster 52 Zone 3B Division 26 7-Dec-2017 9-Dec-2017 1:15 PM 9-Dec-2017 B comments
Closed
Zone 3B, Cluster 52
Installation of PVC Conduit & Box for Lighting System at Ground floor
Approved w/
201 KHEP-EL-0201 at First Floor Slab in Cluster 52 Cluster 52 Zone 3B Division 26 7-Dec-2017 9-Dec-2017 1:30 PM 9-Dec-2017 B comments
Closed
Zone 3B, Cluster 52
Installation of PVC Conduit for Power System at First Floor slab
Approved w/
202 KHEP-EL-0202 Cluster 52 Cluster 52 Zone 3B Division 26 7-Dec-2017 9-Dec-2017 2:00 PM 9-Dec-2017 B comments
Closed
Zone 3B, Cluster 52
Installation of PVC Conduit for Power System in Ground Floor slab
Approved w/
203 KHEP-EL-0203 Cluster 1 Cluster 01 Zone 1A Division 26 10-Dec-2017 11-Dec-2017 1:00 PM 13-Dec-2017 B comments
Closed
Zone 1A, Cluster 1
Installation of PVC Conduit for Mechanical Power System in Ground
Approved w/
204 KHEP-EL-0204 Floor slab of Cluster 1 (For Pumps & Water Heater) Cluster 01 Zone 1A Division 26 10-Dec-2017 11-Dec-2017 1:15 PM 13-Dec-2017 B comments
Closed
Zone 1A, Cluster 1
Installation of PVC Conduit for Mechanical Power System for Ground
205 KHEP-EL-0205 Floor at First Floor slab of Cluster 58 Cluster 58 Zone 3B Division 26 12-Dec-2017 13-Dec-2017 8:15 AM 16-Dec-2017 A Approved Closed
Zone 3B, Cluster 58
Installation of PVC Conduit for Power System in First Floor slab
206 KHEP-EL-0206 Cluster 58 Cluster 58 Zone 3B Division 26 12-Dec-2017 13-Dec-2017 8:30 AM 16-Dec-2017 A Approved Closed
Zone 3B, Cluster 58
Installation of PVC Conduit & Box for Lighting System at Ground floor
Approved w/
207 KHEP-EL-0207 at First Floor Slab in Cluster 58 Cluster 58 Zone 3B Division 26 12-Dec-2017 13-Dec-2017 9:30 AM 16-Dec-2017 B comments
Closed
Zone 3B, Cluster 58
Installation of PVC Conduit for Mechanical Power System in First
208 KHEP-EL-0208 Floor at Roof slab of Cluster 19 Cluster 19 Zone 1B Division 26 14-Dec-2017 16-Dec-2017 8:30 AM 17-Dec-2017 A Approved Closed
Zone 1B, Cluster 19
Installation of PVC Conduit for Mechanical Power System in Roof
209 KHEP-EL-0209 Floor at Roof slab of Cluster 19 Cluster 19 Zone 1B Division 26 14-Dec-2017 16-Dec-2017 9:00 AM 17-Dec-2017 A Approved Closed
Zone 1B, Cluster 19
Installation of PVC Conduit & Box for Lighting System at First floor at
210 KHEP-EL-0210 Roof Slab in Cluster 19 Cluster 19 Zone 1B Division 26 14-Dec-2017 16-Dec-2017 9:30 AM 17-Dec-2017 A Approved Closed
Zone 1B, Cluster 19
Installation of PVC Conduit & Box for Lighting System at Roof floor at
211 KHEP-EL-0211 Roof Slab in Cluster 19 Cluster 19 Zone 1B Division 26 14-Dec-2017 16-Dec-2017 10:00 AM 17-Dec-2017 A Approved Closed
Zone 1B, Cluster 19
Installation of PVC Conduit for Power System in Roof Floor at Roof
212 KHEP-EL-0212 slab Cluster 19 Cluster 19 Zone 1B Division 26 14-Dec-2017 16-Dec-2017 1:30 PM 17-Dec-2017 A Approved Closed
Zone 1B, Cluster 19
Installation of PVC Conduit & Box for Lighting System at First floor at
Approved w/
213 KHEP-EL-0213 Roof Slab in Cluster 75 Cluster 75 Zone 4B Division 26 16-Dec-2017 17-Dec-2017 8:30 AM 18-Dec-2017 B comments
Closed
Zone 4B, Cluster 75
Installation of PVC Conduit & Box for Lighting System at Roof floor at
214 KHEP-EL-0214 Roof Slab in Cluster 75 Cluster 75 Zone 4B Division 26 16-Dec-2017 17-Dec-2017 9:30 AM 18-Dec-2017 A Approved Closed
Zone 4B, Cluster 75
Installation of PVC Conduit for Mechanical Power System in First
215 KHEP-EL-0215 Floor at Roof slab of Cluster 75 Cluster 75 Zone 4B Division 26 16-Dec-2017 17-Dec-2017 10:30 AM 18-Dec-2017 A Approved Closed
Zone 4B, Cluster 75
Installation of PVC Conduit for Mechanical Power System in Roof
Approved w/
216 KHEP-EL-0216 Floor at Roof slab of Cluster 75 Cluster 75 Zone 4B Division 26 16-Dec-2017 17-Dec-2017 1:30 PM 18-Dec-2017 B comments
Closed
Zone 4B, Cluster 75
Installation of PVC Conduit for Power System in Roof Floor at Roof
217 KHEP-EL-0217 slab Cluster 75 Cluster 75 Zone 4B Division 26 16-Dec-2017 17-Dec-2017 1:45 PM 18-Dec-2017 A Approved Closed
Zone 4B, Cluster 75
Installation of 50mm PVC sleeves for grounding system at Ground
Approved w/
218 KHEP-EL-0218 Floor at Grid Beam in Cluster 22 Cluster 22 Zone 1B Division 26 16-Dec-2017 17-Dec-2017 1:50 PM 18-Dec-2017 B comments
Closed
Zone 1B , Cluster 22
Installation of black out foam for main Panel board Power System
Approved w/
219 KHEP-EL-0219 For Ground Floor at Grid Beam in Cluster 22 Cluster 22 Zone 1B Division 26 16-Dec-2017 17-Dec-2017 2:00 PM 18-Dec-2017 B comments
Closed
Zone 1B, Cluster 22
Installation of PVC Conduit for Power System for ground Floor at
Approved w/
220 KHEP-EL-0220 ground floor slab Cluster 1 Cluster 01 Zone 1A Division 26 17-Dec-2017 18-Dec-2017 8:30 AM 23-Dec-2017 B comments
Closed
Zone 1A, Cluster 1
Installation of PVC Conduit for Mechanical Power System for ground
221 KHEP-EL-0221 Floor at ground floor slab of Cluster 1 Cluster 01 Zone 1A Division 26 17-Dec-2017 18-Dec-2017 9:30 AM 20-Nov-2017 E Rejected Closed
Zone 1A, Cluster 1
Installation of PVC Conduit for Mechanical Power System for ground Approved w/
221.1 KHEP-EL-0221-01
Floor at ground floor slab of Cluster 1 - Zone 1A, Cluster 1
Cluster 01 Zone 1A Division 26 21-Dec-2017 23-Dec-2017 9:30 AM 26-Dec-2017 B comments
Closed
Installation of PVC Conduit and outlet box for convenience outlet for
222 KHEP-EL-0222 first floor at wall in Cluster 69 Zone 4B, Cluster 69 Zone 4B Division 26 18-Dec-2017 19-Dec-2017 9:00 AM 21-Dec-2017 E Rejected Closed
Cluster 69
Installation of EMT Conduit and outlet box for convenience outlet for
Approved w/
222.1 KHEP-EL-0222-01 first floor at wall in Cluster 69 Zone 4B, Cluster 69 Zone 4B Division 26 26-Dec-2017 27-Dec-2017 8:30 AM 28-Dec-2017 B comments
Closed
Cluster 69
Installation of PVC Conduit and outlet box for lighting switch for first
223 KHEP-EL-0223 floor at wall in Cluster 69 Zone 4B, Cluster 69 Zone 4B Division 26 18-Dec-2017 19-Dec-2017 9:30 AM 21-Dec-2017 E Rejected Closed
Cluster 69
Installation of EMT Conduit and outlet box for lighting switch for first
Approved w/
223.1 KHEP-EL-0223-01 floor at wall in Cluster 69 Zone 4B, Cluster 69 Zone 4B Division 26 26-Dec-2017 27-Dec-2017 9:30 AM 30-Dec-2017 B comments
Closed
Cluster 69
Installation of PVC Conduit & Box for Lighting System first floor at
Approved w/
224 KHEP-EL-0224 Roof Slab in Cluster 61 Cluster 61 Zone 3B Division 26 19-Dec-2017 20-Dec-2017 8:30 AM 23-Dec-2017 B comments
Closed
Zone 3B, Cluster 61
Installation of PVC Conduit for Mechanical Power System for first
225 KHEP-EL-0225 floor at roof slab in Cluster 61 Cluster 61 Zone 3B Division 26 19-Dec-2017 20-Dec-2017 8:45 AM 21-Dec-2017 A Approved Closed
Zone 3B, Cluster 61
Installation of PVC Conduit for Power System for Roof Floor at Roof
226 KHEP-EL-0226 slab Cluster 61 Cluster 61 Zone 3B Division 26 19-Dec-2017 20-Dec-2017 9:00 AM 21-Dec-2017 A Approved Closed
Zone 3B, Cluster 61
Installation of PVC Conduit for Mechanical Power System for roof
Approved w/
227 KHEP-EL-0227 floor at roof slab in Cluster 61 Cluster 61 Zone 3B Division 26 19-Dec-2017 20-Dec-2017 9:15 AM 21-Dec-2017 B comments
Closed
Zone 3B, Cluster 61
Installation of PVC Conduit & box for lighting System for roof floor at
Approved w/
228 KHEP-EL-0228 roof slab in Cluster 61 Zone 3B, Cluster 61 Zone 3B Division 26 19-Dec-2017 20-Dec-2017 10:15 AM 23-Dec-2017 B comments
Closed
Cluster 61
Installation of PVC Conduit & box for lighting System for first floor at Approved w/
229 KHEP-EL-0229
roof slab in Cluster 20 Zone 1B, Cluster 20
Cluster 20 Zone 1B Division 26 24-Dec-2017 25-Dec-2017 8:15 AM 27-Dec-2017 B comments
Closed
Installation of PVC Conduit & box for lighting System for roof floor at Approved w/
230 KHEP-EL-0230
roof slab in Cluster 20 Zone 1B, Cluster 20
Cluster 20 Zone 1B Division 26 24-Dec-2017 25-Dec-2017 8:30 AM 30-Dec-2017 B comments
Closed
Installation of PVC Conduit for Power System for Roof Floor at Roof
231 KHEP-EL-0231
slab Cluster 20 Zone 1B Cluster 20
Cluster 20 Zone 1B Division 26 24-Dec-2017 25-Dec-2017 8:45 AM 27-Dec-2017 A Approved Closed
Installation of PVC Conduit for Power System for First Floor at First
235 KHEP-EL-0235
Floor slab Cluster 34 Zone 2B
Cluster 34 Zone 2B Division 26 25-Dec-2017 26-Dec-2017 9:30 AM 27-Dec-2017 A Approved Closed
Installation of PVC Conduit & box for lighting System for Ground floor
236 KHEP-EL-0236
at First Floor slab in Cluster 34 Zone 2B
Cluster 34 Zone 2B Division 26 25-Dec-2017 26-Dec-2017 10:30 AM 28-Dec-2017 A Approved Closed
Installation of EMT Conduit box for Single Switch for Fan Control Unit Approved w/
237 KHEP-EL-0237
for First Floor at wall in Cluster 69 Zone 4B
Cluster 69 Zone 4B Division 26 26-Dec-2017 27-Dec-2017 8:45 AM 30-Dec-2017 B comments
Closed
Installation of EMT Conduit box for Light Switch for Ground floor at Approved w/
238 KHEP-EL-0238
wall in Cluster 69 Zone 4B
Cluster 69 Zone 4B Division 26 26-Dec-2017 27-Dec-2017 8:45 AM 30-Dec-2017 B comments
Closed
Installation of PVC Conduit for Power System for Roof Floor at Roof
240 KHEP-EL-0240
slab Cluster 3 Zone 1A
Cluster 3 Zone 1A Division 26 27-Dec-2017 28-Dec-2017 8:30 AM 30-Dec-2017 A Approved Closed
Installation of PVC Conduit & box for lighting System for roof floor at Approved w/
241 KHEP-EL-0241
roof slab in Cluster 3 Zone 1A
Cluster 3 Zone 1A Division 26 27-Dec-2017 28-Dec-2017 8:45 AM 1-Jan-2018 B comments
Closed
Installation of PVC Conduit & box for lighting System for first floor at Approved w/
242 KHEP-EL-0242
roof slab in Cluster 3 Zone 1A
Cluster 3 Zone 1A Division 26 27-Dec-2017 28-Dec-2017 9:00 AM 1-Jan-2018 B comments
Closed
Installation of PVC Conduit & box for lighting System for Ground floor Approved w/
247 KHEP-EL-0247
at First Floor slab in Cluster 35 Zone 2B
Cluster 35 Zone 2B Division 26 28-Dec-2017 30-Dec-2017 8:45 AM 2-Jan-2018 B comments
Closed
Installation of PVC Conduit for Power System for First Floor at First Approved w/
248 KHEP-EL-0248
Floor slab Cluster 35 Zone 2B
Cluster 35 Zone 2B Division 26 28-Dec-2017 30-Dec-2017 9:30 AM 2-Jan-2018 B comments
Closed
Installation of PVC Conduit & box for lighting System for first floor at Approved w/
251 KHEP-EL-0251
roof slab in Cluster 48
Cluster 48 Zone 3B Division 26 30-Dec-2017 31-Dec-2017 8:00 AM 2-Jan-2018 B comments
Closed
Installation of PVC Conduit & box for lighting System for Roof floor at Approved w/
252 KHEP-EL-0252
roof slab in Cluster 48
Cluster 48 Zone 3B Division 26 30-Dec-2017 31-Dec-2017 8:20 AM 2-Jan-2018 B comments
Closed
Installation of PVC Conduit for Mechanical Power System for Roof Approved w/
254 KHEP-EL-0254
Floor at Roof slab in Cluster 48 Zone 3B
Cluster 48 Zone 3B Division 26 30-Dec-2017 31-Dec-2017 8:30 AM 2-Jan-2018 B comments
Closed
Installation of PVC Conduit for Power System for Roof Floor at Roof
255 KHEP-EL-0255
slab Cluster 48 Zone 3B
Cluster 48 Zone 3B Division 26 30-Dec-2017 31-Dec-2017 9:30 AM 1-Jan-2018 A Approved Closed
Installation of PVC Conduit & box for lighting System for Ground floor Approved w/
256 KHEP-EL-0256
at First Floor slab in Cluster 81
Cluster 81 Zone 4A Division 26 30-Dec-2017 31-Dec-2017 1:00 PM 2-Jan-2018 B comments
Closed
Installation of PVC Conduit for Power System for First Floor at First
257 KHEP-EL-0257
Floor slab Cluster 81 Zone 4A
Cluster 81 Zone 4A Division 26 30-Dec-2017 31-Dec-2017 1:20 PM 1-Jan-2018 A Approved Closed
Installation of PVC Conduit for Mechanical Power System for Ground Approved w/
258 KHEP-EL-0258
Floor at First Floor slab in Cluster 81 Zone 4A
Cluster 81 Zone 4A Division 26 30-Dec-2017 31-Dec-2017 1:20 PM 2-Jan-2018 B comments
Closed
Installation of PVC Conduit for Mechanical Power System for Ground Approved w/
259 KHEP-EL-0259
Floor at Ground Floor slab Cluster 2 Zone 1A
Cluster 02 Zone 1A Division 26 30-Dec-2017 31-Dec-2017 8:30 AM 2-Jan-2018 B comments
Closed
Installation of PVC Conduit for Power System for Roof Floor at Roof Approved w/
260 KHEP-EL-0260
slab Cluster 2 Zone 1A
Cluster 02 Zone 1A Division 26 30-Dec-2017 31-Dec-2017 9:30 AM 2-Jan-2018 B comments
Closed
Installation of blackout foam for PVC Conduit Installation Panel Board Approved w/
262 KHEP-EL-0262
for Ground Floor at Grade Beam in Cluster 55
Cluster 55 Zone 3B Division 26 1-Jan-2018 2-Jan-2018 8:20 AM 3-Jan-2018 B comments
Closed
Installation of EMT Conduit box for FCU's Single Switch for First floor
263 KHEP-EL-0263
at wall in Cluster 69 Zone 4B
Cluster 69 Zone 4B Division 26 1-Jan-2018 2-Jan-2018 8:20 AM 6-Jan-2018 A Approved Closed
Installation of EMT Conduit box for Lighting Switch for First floor at
264 KHEP-EL-0264 Cluster 69 Zone 4B Division 26 1-Jan-2018 2-Jan-2018 8:00 AM RECALLED
wall in Cluster 69 Zone 4B
Installation of EMT Conduit & Outlet Box for Convenience Outlet for Approved w/
265 KHEP-EL-0265
First at wall in Cluster 69 Zone 4B
Cluster 69 Zone 4B Division 26 2-Jan-2018 3-Jan-2018 8:45 AM 3-Jan-2018 B comments
Closed
Installation of EMT Conduit & Outlet Box for Exhaust Fan & Timer
267 KHEP-EL-0267
Switch at Ceiling & wall Portion Cluster 69 Zone 4B
Cluster 69 Zone 4B Division 26 2-Jan-2018 3-Jan-2018 8:30 AM 6-Jan-2018 A Approved Closed
Installation of PVC Conduit for Mechanical Power System for Ground Approved w/
268 KHEP-EL-0268
Floor at Ground Floor slab Cluster 2 Zone 1A Villa 344
Cluster 02 Zone 1A Division 26 3-Jan-2018 4-Jan-2018 8:00 AM 7-Jan-2018 B comments
Closed
Installation of PVC Conduit for Power System for Ground Floor at Cluster 02 Approved w/
269 KHEP-EL-0269
Ground Floor slab Cluster 2 Zone 1A Villa 3&4 Villa 3, Villa 4
Zone 1A Division 26 3-Jan-2018 4-Jan-2018 8:30 AM 7-Jan-2018 B comments
Closed
Installation of PVC Conduit for Mechanical Power System for Ground Cluster 02 Approved w/
270 KHEP-EL-0270
Floor at Ground Floor slab Cluster 2 Zone 1A Villa 1&2 Villa 1, Villa 2
Zone 1A Division 26 3-Jan-2018 4-Jan-2018 1:00 PM 6-Jan-2018 B comments
Closed
Installation of PVC Conduit for Power System for Ground Floor at Cluster 02 Approved w/
271 KHEP-EL-0271
Ground Floor slab Cluster 2 Zone 1A Villa 142 Villa 1, Villa 2
Zone 1A Division 26 3-Jan-2018 4-Jan-2018 1:30 PM 6-Jan-2018 B comments
Closed
Installation of 50mm PVC Sleeves for Grounding system for ground Approved w/
272 KHEP-EL-0272
floor at ground floor grade beam in Cluster 25 Zone 2B Cluster 25
Cluster 25 Zone 2B Division 26 4-Jan-2018 6-Jan-2018 8:00 AM 8-Jan-2018 B comments
Closed
Installation of PVC Conduit for Power System for Roof Floor at Roof
276 KHEP-EL-0276
slab Cluster 51 Zone 3B
Cluster 51 Zone 3B Division 26 7-Jan-2018 8-Jan-2018 8:00 AM 9-Jan-2018 A Approved Closed
Installation of PVC Conduit for Mechanical Power System for Roof Approved w/
277 KHEP-EL-0277
Floor at Roof slab Cluster 51 Zone 3B
Cluster 51 Zone 3B Division 26 7-Jan-2018 8-Jan-2018 8:20 AM 9-Jan-2018 B comments
Closed
Installation of PVC Conduits & box for lighting System for Roof floor Approved w/
278 KHEP-EL-0278
at Roof slab in Cluster 51 Zone 3B
Cluster 51 Zone 3B Division 26 7-Jan-2018 8-Jan-2018 8:30 AM 10-Jan-2018 B comments
Closed
Installation of PVC Conduits & box for lighting System for First floor Approved w/
279 KHEP-EL-0279
at First Floor slab in Cluster 51 Zone 3B
Cluster 51 Zone 3B Division 26 7-Jan-2018 8-Jan-2018 8:40 AM 10-Jan-2018 B comments
Closed
Installation of EMT conduits & outlets box for FCU switch for ground
281 KHEP-EL-0281
floor in Cluster 69 Zone 4B
Cluster 69 Zone 4B Division 26 8-Jan-2018 9-Jan-2018 9:00 AM 10-Jan-2018 A Approved Closed
Installation of EMT conduits & outlets box for Lighting switch for
Approved w/
282 KHEP-EL-0282 ground floor in Cluster 69 Zone 4B exluding garage telecom room & Cluster 69 Zone 4B Division 26 8-Jan-2018 9-Jan-2018 9:10 AM 10-Jan-2018 B comments
Closed
lighting switch at door intrance
Installation of EMT conduits & outlets box for power system for Approved w/
283 KHEP-EL-0283
ground floor in Cluster 69 Zone 4B Excluding garage & telecom room
Cluster 69 Zone 4B Division 26 8-Jan-2018 9-Jan-2018 9:20 AM 10-Jan-2018 B comments
Closed
Installation of PVC Conduit for Mechanical Power System for Roof Approved w/
284 KHEP-EL-0284
Floor at Roof slab Cluster 27 Zone 2B
Cluster 27 Zone 2B Division 26 8-Jan-2018 9-Jan-2018 8:00 AM 10-Jan-2018 B comments
Closed
Installation of PVC Conduit for Mechanical Power System for First Approved w/
285 KHEP-EL-0285
Floor at Roof slab Cluster 27 Zone 2B
Cluster 27 Zone 2B Division 26 8-Jan-2018 9-Jan-2018 8:10 AM 10-Jan-2018 B comments
Closed
Installation of PVC Conduit for Power System for Roof Floor at Roof
286 KHEP-EL-0286
Slab Cluster 27 Zone 2B
Cluster 27 Zone 2B Division 26 8-Jan-2018 9-Jan-2018 8:20 AM 10-Jan-2018 A Approved Closed
Installation of PVC Conduits & box for lighting System for Roof floor Approved w/
287 KHEP-EL-0287
at Roof slab in Cluster 27 Zone 2B
Cluster 27 Zone 2B Division 26 8-Jan-2018 9-Jan-2018 8:40 AM 10-Jan-2018 B comments
Closed
Installation of PVC Conduits & box for lighting System for First floor Approved w/
288 KHEP-EL-0288
at Roof slab in Cluster 27 Zone 2B
Cluster 27 Zone 2B Division 26 8-Jan-2018 9-Jan-2018 9:40 AM 10-Jan-2018 B comments
Closed
Installation of PVC Conduits & box for lighting System for Ground Approved w/
289 KHEP-EL-0289
floor at Firt Floor slab in Cluster 72 Zone 4B
Cluster 72 Zone 4B Division 26 9-Jan-2018 10-Jan-2018 8:00 AM 11-Jan-2018 B comments
Closed
Installation of PVC Conduit for Mechanical Power System for Ground Approved w/
290 KHEP-EL-0290
floor at Firt Floor slab Cluster 72 Zone 4B
Cluster 72 Zone 4B Division 26 9-Jan-2018 10-Jan-2018 8:10 AM 11-Jan-2018 B comments
Closed
Installation of PVC Conduit for Power System for First Floor at Firt
291 KHEP-EL-0291
Floor slab Cluster 72 Zone 4B
Cluster 72 Zone 4B Division 26 9-Jan-2018 10-Jan-2018 8:30 AM 11-Jan-2018 A Approved Closed
Installation of PVC Conduits for Power system for First Floor at First
292 KHEP-EL-0292
Floor Slab in Cluster 54 Zone 3B
Cluster 54 Zone 3B Division 26 10-Jan-2018 11-Jan-2018 9:00 AM 13-Jan-2018 A Approved Closed
Installation of PVC Conduits for Mechanical Power system for Ground Approved w/
293 KHEP-EL-0293
Floor at First Floor Slab in Cluster 54 Zone 3B
Cluster 54 Zone 3B Division 26 10-Jan-2018 11-Jan-2018 9:10 AM 13-Jan-2018 B comments
Closed
Installation of PVC Conduits & box for Lighting System for Ground Approved w/
294 KHEP-EL-0294
Floor at First Floor Slab in Cluster 54 Zone 3B
Cluster 54 Zone 3B Division 26 10-Jan-2018 11-Jan-2018 9:30 AM 15-Jan-2018 B comments
Closed
Installation of EMT conduits & outlets box for Exhaust Fan & Timer Approved w/
295 KHEP-EL-0295
Switch for ground floor in Cluster 69 Zone 4B
Cluster 69 Zone 4B Division 26 10-Jan-2018 11-Jan-2018 8:00 AM 13-Jan-2018 B comments
Closed
Installation of PVC Conduits & box for Lighting System for Roof Floor Approved w/
296 KHEP-EL-0296
at Roof Floor Slab in Cluster 52 Zone 3B
Cluster 52 Zone 3B Division 26 13-Jan-2018 14-Jan-2018 8:30 AM 15-Jan-2018 B comments
Closed
Installation of PVC Conduits for Power system for Roof Floor at Roof
297 KHEP-EL-0297
Floor Slab in Cluster 52 Zone 3B
Cluster 52 Zone 3B Division 26 13-Jan-2018 14-Jan-2018 8:45 AM 15-Jan-2018 A Approved Closed
Installation of PVC Conduits for Mechanical Power system for Roof Approved w/
298 KHEP-EL-0298
Floor at Roof Floor Slab in Cluster 52 Zone 3B
Cluster 52 Zone 3B Division 26 13-Jan-2018 14-Jan-2018 8:55 AM 15-Jan-2018 B comments
Closed
Installation of PVC Conduits for Power system for First Floor at Roof
299 KHEP-EL-0299
Floor Slab in Cluster 52 Zone 3B
Cluster 52 Zone 3B Division 26 13-Jan-2018 14-Jan-2018 9:00 AM 15-Jan-2018 A Approved Closed
Installation of PVC Conduits & box for Lighting System for First Floor Approved w/
300 KHEP-EL-0300
at First Floor Slab in Cluster 52 Zone 3B
Cluster 52 Zone 3B Division 26 13-Jan-2018 14-Jan-2018 9:15 AM 15-Jan-2018 B comments
Closed
Installation of PVC Conduits & box for Lighting System for Ground Approved w/
301 KHEP-EL-0301
Floor at First Floor Slab in Cluster 30 Zone 3B
Cluster 30 Zone 3B Division 26 13-Jan-2018 14-Jan-2018 9:30 AM 15-Jan-2018 B comments
Closed
Installation of PVC Conduits for Power system for First Floor at First
303 KHEP-EL-0303
Floor Slab in Cluster 30 Zone 3B
Cluster 30 Zone 3B Division 26 13-Jan-2018 14-Jan-2018 10:00 AM 15-Jan-2018 A Approved Closed
Installation of PVC Conduits for Power system for roof floor at roof
304 KHEP-EL-0304
floor Slab in Cluster 16 Zone 1B
Cluster 16 Zone 1B Division 26 14-Jan-2018 15-Jan-2018 8:30 AM 16-Jan-2018 A Approved Closed
Installation of PVC Conduits & box for Lighting System for roof floor Approved w/
305 KHEP-EL-0305
at roof floor Slab in Cluster 16 Zone 1B
Cluster 16 Zone 1B Division 26 14-Jan-2018 15-Jan-2018 8:50 AM 16-Jan-2018 B comments
Closed
Installation of PVC Conduits for Mechanical Power system for roof Approved w/
306 KHEP-EL-0306
floor at roof floor Slab in Cluster 16 Zone 1B
Cluster 16 Zone 1B Division 26 14-Jan-2018 15-Jan-2018 8:50 AM 16-Jan-2018 B comments
Closed
Installation of PVC Conduits & box for Lighting System for first floor Approved w/
308 KHEP-EL-0308
at roof floor Slab in Cluster 16 Zone 1B
Cluster 16 Zone 1B Division 26 14-Jan-2018 15-Jan-2018 9:35 AM 16-Jan-2018 B comments
Closed
Installation of PVC Conduits & box for Lighting System for ground Approved w/
309 KHEP-EL-0309
floor at first floor Slab in Cluster 21 Zone 1B
Cluster 21 Zone 1B Division 26 15-Jan-2018 16-Jan-2018 8:15 AM 20-Jan-2018 B comments
Closed
Installation of PVC Conduits for Mechanical Power system for ground Approved w/
310 KHEP-EL-0310
floor at first floor Slab in Cluster 21 Zone 1B
Cluster 21 Zone 1B Division 26 15-Jan-2018 16-Jan-2018 8:45 AM 20-Jan-2018 B comments
Closed
Installation of PVC Conduits for Power system for first floor at first
311 KHEP-EL-0311
floor Slab in Cluster 21 Zone 1B
Cluster 21 Zone 1B Division 26 15-Jan-2018 16-Jan-2018 9:45 AM 20-Jan-2018 A Approved Closed
Installation black out foam for power system outlets for floor
312 KHEP-EL-0312
columns in Cluster 81 Zone 4B
Cluster 81 Zone 4B Division 26 15-Jan-2018 16-Jan-2018 8:00 AM 20-Jan-2018 E Rejected Closed
Installation of pvc conduits for mechanical power system for roof Approved w/
315 KHEP-EL-0315
floor at roof slab in Cluster 71 Zone 4B
Cluster 71 Zone 4B Division 26 17-Jan-2018 18-Jan-2018 8:40 AM 20-Jan-2018 B comments
Closed
Installation of pvc conduits and boxes for lighting system for roof Approved w/
316 KHEP-EL-0316
floor at roof slab in Cluster 71 Zone 4B
Cluster 71 Zone 4B Division 26 17-Jan-2018 18-Jan-2018 9:00 AM 20-Jan-2018 B comments
Closed
Installation of pvc conduits and boxes for lighting system for first Approved w/
317 KHEP-EL-0317
floor at roof slab in Cluster 71 Zone 4B
Cluster 71 Zone 4B Division 26 17-Jan-2018 18-Jan-2018 9:20 AM 20-Jan-2018 B comments
Closed
Installation of pvc conduits for mechanical power system for first Approved w/
318 KHEP-EL-0318
floor at roof slab in Cluster 71 Zone 4B
Cluster 71 Zone 4B Division 26 17-Jan-2018 18-Jan-2018 9:30 AM 20-Jan-2018 B comments
Closed
Installation of pvc sleeves for grounding system for grade beam in Approved w/
319 KHEP-EL-0319
Cluster 42 Zone 2B
Cluster 42 Zone 2B Division 26 17-Jan-2018 18-Jan-2018 9:30 AM 20-Jan-2018 B comments
Closed
Installation of black out foam for pvc installation for panelboard at Approved w/
320 KHEP-EL-0320
grade beam in Cluster 42 Zone 2B
Cluster 42 Zone 2B Division 26 17-Jan-2018 18-Jan-2018 9:45 AM 20-Jan-2018 B comments
Closed
Cable pulling of wiring cables for power lighting & power system at Approved w/
321 KHEP-EL-0321
first floor in Cluster 69 Zone 4B
Cluster 69 Zone 4B Division 26 18-Jan-2018 20-Jan-2018 9:45 AM 23-Jan-2018 B comments
Closed
Installation of pvc conduits for power system for first floor at first
326 KHEP-EL-0326
floor slab in Cluster 18 Zone 1B
Cluster 18 Zone 1B Division 26 22-Jan-2018 23-Jan-2018 8:00 AM 24-Jan-2018 A Approved Closed
Installation of pvc conduits for mechanical power system for ground Approved w/
327 KHEP-EL-0327
floor at first floor slab in Cluster 18 Zone 1B
Cluster 18 Zone 1B Division 26 22-Jan-2018 23-Jan-2018 8:30 AM 24-Jan-2018 B comments
Closed
Installation of PVC Conduits & box for Lighting System for ground Approved w/
328 KHEP-EL-0328
floor at first floor Slab in Cluster 18 Zone 1B
Cluster 18 Zone 1B Division 26 22-Jan-2018 23-Jan-2018 8:40 AM 25-Jan-2018 B comments
Closed
Installation of pvc conduits for mechanical power system for ground Approved w/
332 KHEP-EL-0332
floor at first floor slab in Cluster 66 Zone 4A
Cluster 66 Zone 4A Division 26 24-Jan-2018 25-Jan-2018 8:40 AM 27-Jan-2018 B comments
Closed
Installation of pvc conduits for power system for first floor at first Approved w/
333 KHEP-EL-0333
floor slab in Cluster 66 Zone 4A
Cluster 66 Zone 4A Division 26 24-Jan-2018 25-Jan-2018 9:40 AM 27-Jan-2018 B comments
Closed
Installation of PVC Conduits & box for Lighting System for ground
334 KHEP-EL-0334
floor at first floor Slab in Cluster 66 Zone A4
Cluster 66 Zone A4 Division 26 24-Jan-2018 25-Jan-2018 8:30 AM 27-Jan-2018 A Approved Closed
Cable pulling of 1CX4 sq.mm LV cable for power & lighting system
335 KHEP-EL-0335 for circuit connections & homerun for ground floor in Cluster 69 Zone Cluster 69 Zone 4B Division 26 28-Jan-2018 29-Jan-2018 8:00 AM 7-Feb-2018 E Rejected Closed
4B Garage & Telecom rooms area
Cable pulling of 1CX4 sq.mm wiring cable for power & lighting
336 KHEP-EL-0336
system homerun for ground floor in Cluster 69 Zone 4B
Cluster 69 Zone 4B Division 26 28-Jan-2018 29-Jan-2018 8:20 AM 31-Jan-2018 E Rejected Closed
Cable pulling of 1CX4 sq.mm wiring cable for power & lighting
337 KHEP-EL-0337
system homerun for first floor in Cluster 69 Zone 4B
Cluster 69 Zone 4B Division 26 28-Jan-2018 29-Jan-2018 8:30 AM 31-Jan-2018 E Rejected Closed
Cable pulling of 1CX4 sq.mm wiring cable for mechanical power
338 KHEP-EL-0338
system for ground floor in Cluster 69 Zone 4B
Cluster 69 Zone 4B Division 26 28-Jan-2018 29-Jan-2018 9:30 AM 31-Jan-2018 E Rejected Closed
Installation of PVC Conduits & box for Lighting System for ground Approved w/
340 KHEP-EL-0340
floor at first floor Slab in Cluster 44 Zone 2A
Cluster 44 Zone 2A Division 26 25-Jan-2018 27-Jan-2018 1:30 PM 28-Jan-2018 B comments
Closed
Installation of pvc conduits for power system for first floor at first Approved w/
341 KHEP-EL-0341
floor slab in Cluster 44 Zone 2A
Cluster 44 Zone 2A Division 26 25-Jan-2018 27-Jan-2018 1:50 PM 28-Jan-2018 B comments
Closed
Installation of pvc conduits for mechanical power system for ground Approved w/
342 KHEP-EL-0342
floor at first floor slab in Cluster 44 Zone 2A
Cluster 44 Zone 2A Division 26 25-Jan-2018 27-Jan-2018 2:50 PM 28-Jan-2018 B comments
Closed
Installation of PVC Conduits & box for Lighting System for ground Approved w/
345 KHEP-EL-0345
floor at first floor Slab in Cluster 23 Zone 1B
Cluster 23 Zone 1B Division 26 27-Jan-2018 28-Jan-2018 1:30 PM 31-Jan-2018 B comments
Closed
Installation of pvc conduits for power system for first floor at first Approved w/
346 KHEP-EL-0346
floor slab in Cluster 23 Zone 1B
Cluster 23 Zone 1B Division 26 27-Jan-2018 28-Jan-2018 1:40 PM 31-Jan-2018 B comments
Closed
Installation of pvc conduits for mechanical power system for ground Approved w/
347 KHEP-EL-0347
floor at first floor slab in Cluster 23 Zone 1B
Cluster 23 Zone 1B Division 26 27-Jan-2018 28-Jan-2018 2:40 PM 30-Jan-2018 B comments
Closed
Installation of pvc conduits for mechanical power system for ground Approved w/
348 KHEP-EL-0348
floor at ground floor slab in Cluster 14 Zone 1B
Cluster 14 Zone 1B Division 26 27-Jan-2018 28-Jan-2018 8:40 AM 29-Jan-2018 B comments
Closed
Installation of pvc conduits for power system for ground floor at Approved w/
349 KHEP-EL-0349
ground floor slab in Cluster 14 Zone 1B
Cluster 14 Zone 1B Division 26 27-Jan-2018 28-Jan-2018 8:50 AM 29-Jan-2018 B comments
Closed
Installation of pvc conduits for mechanical power system for ground Approved w/
350 KHEP-EL-0350
floor in Cluster 69 Zone 4B
Cluster 69 Zone 4B Division 26 27-Jan-2018 28-Jan-2018 9:00 AM 30-Jan-2018 B comments
Closed
Cable pulling of wiring cable for power & lighting system for ground
351 KHEP-EL-0351
floor at garage & Telecom room areas in Cluster 69 Zone 4B
Cluster 69 Zone 4B Division 26 27-Jan-2018 28-Jan-2018 9:00 AM 30-Jan-2018 E Rejected Closed
Cable pulling of wiring cable for power & lighting system for first floor
352 KHEP-EL-0352
at garage & Telecom room areas in Cluster 69 Zone 4B
Cluster 69 Zone 4B Division 26 27-Jan-2018 28-Jan-2018 9:10 AM 30-Jan-2018 E Rejected Closed
Installation of PVC Conduits & box for Lighting System for ground Approved w/
353 KHEP-EL-0353
floor at first floor Slab in Cluster 60 Zone 3B
Cluster 60 Zone 3B Division 26 29-Jan-2018 30-Jan-2018 8:10 AM 31-Jan-2018 B comments
Closed
Installation of PVC Conduits & box for Lighting System for ground
354 KHEP-EL-0354
floor at first floor Slab in Cluster 60 Zone 3B
Cluster 60 Zone 3B Division 26 29-Jan-2018 30-Jan-2018 8:20 AM 31-Jan-2018 A Approved Closed
Installation of pvc conduits for mechanical power system for ground Approved w/
355 KHEP-EL-0355
floor at first floor slab in Cluster 60 Zone 3B
Cluster 60 Zone 3B Division 26 29-Jan-2018 30-Jan-2018 8:30 AM 31-Jan-2018 B comments
Closed
Installation of pvc conduits for power system for ground floor slab in Approved w/
356 KHEP-EL-0356
Cluster 13 Zone 1B
Cluster 13 Zone 1B Division 26 29-Jan-2018 30-Jan-2018 1:30 PM 31-Jan-2018 B comments
Closed
Installation of pvc conduits for power system for roof floor & roof
360 KHEP-EL-0360
slab in Cluster 4 Zone 1A
Cluster 4 Zone 1A Division 27 31-Jan-2018 1-Feb-2018 8:00 AM 1-Feb-2018 A Approved Closed
Installation of pvc conduits for mechanical power system for roof Approved w/
361.1 KHEP-EL-0361-01
floor & roof slab in Cluster 4 Zone 1A
Cluster 4 Zone 1A Division 26 18-Feb-2018 19-Feb-2018 8:30 AM 19-Feb-2018 B comments
Closed
Installation of PVC conduits & GI boxes for first floor mechanical Approved w/
362 KHEP-EL-0362
power system at roof slab of Cluster 4 Zone 1A
Cluster 4 Zone 1A Division 27 31-Jan-2018 1-Feb-2018 9:00 AM 1-Feb-2018 B comments
Closed
Installation of PVC conduits & GI boxes for first floor lighting system Approved w/
363 KHEP-EL-0363
at roof slab of Cluster 4 Zone 1A
Cluster 4 Zone 1A Division 27 31-Jan-2018 1-Feb-2018 9:30 AM 6-Feb-2018 B comments
Closed
Installation of PVC conduits & GI boxes for roof floor lighting system Approved w/
364 KHEP-EL-0364
at roof slab of Cluster 4 Zone 1A
Cluster 4 Zone 1A Division 27 31-Jan-2018 1-Feb-2018 10:00 AM 6-Feb-2018 B comments
Closed
Installation of PVC conduits for Power system for ground floor Cluster Approved w/
365 KHEP-EL-0365
5 Zone 1B
Cluster 5 Zone 1B Division 26 1-Feb-2018 3-Feb-2018 8:20 AM 6-Feb-2018 B comments
Closed
Installation of pvc conduits for Mechanical power system for ground Approved w/
366 KHEP-EL-0366
floor in Cluster 5 Zone 1B
Cluster 5 Zone 1B Division 26 1-Feb-2018 3-Feb-2018 8:20 AM 6-Feb-2018 B comments
Closed
Installation of pvc conduits for Mechanical power system for first Approved w/
368 KHEP-EL-0368
floor at roof floor slab in Cluster 6 Zone 1B
Cluster 6 Zone 1B Division 26 3-Feb-2018 4-Feb-2018 8:40 AM 6-Feb-2018 B comments
Closed
Installation of PVC conduits for Power system for roof floor at roof
369 KHEP-EL-0369
floor slab in Cluster 6 Zone 1B
Cluster 6 Zone 1B Division 26 3-Feb-2018 4-Feb-2018 9:40 AM 5-Feb-2018 A Approved Closed
Installation of PVC Conduits & box for Lighting System for roof floor Approved w/
370 KHEP-EL-0370
at roof floor slab in Cluster 6 Zone 1B
Cluster 6 Zone 1B Division 26 3-Feb-2018 4-Feb-2018 9:30 AM 6-Feb-2018 B comments
Closed
Installation of PVC Conduits & box for Lighting System for first floor Approved w/
371 KHEP-EL-0371
at roof floor slab in Cluster 6 Zone 1B
Cluster 6 Zone 1B Division 26 3-Feb-2018 4-Feb-2018 10:30 AM 6-Feb-2018 B comments
Closed
Installation of PVC Conduits & box for Lighting System for ground Approved w/
372 KHEP-EL-0372
floor at first floor slab in Cluster 63 Zone 3B
Cluster 63 Zone 3B Division 26 3-Feb-2018 4-Feb-2018 8:00 AM 6-Feb-2018 B comments
Closed
Installation of PVC conduits for Power system for first floor at first
373 KHEP-EL-0373
floor slab in Cluster 63 Zone 3B
Cluster 63 Zone 3B Division 26 3-Feb-2018 4-Feb-2018 8:10 AM 5-Feb-2018 A Approved Closed
Installation of pvc conduits for Mechanical power system for ground Approved w/
374 KHEP-EL-0374
floor at first floor slab in Cluster 63 Zone 3B
Cluster 63 Zone 3B Division 26 3-Feb-2018 4-Feb-2018 8:50 AM 5-Feb-2018 B comments
Closed
Installation of PVC conduits for power system for roof floor at roof
377 KHEP-EL-0377
slab in Cluster 73 Zone 4B
Cluster 73 Zone 4B Division 26 5-Feb-2018 6-Feb-2018 8:30 AM 7-Feb-2018 A Approved Closed
Installation of pvc conduits for Mechanical power system for roof Approved w/
378 KHEP-EL-0378
floor at roof slab in Cluster 73 Zone 4B
Cluster 73 Zone 4B Division 26 5-Feb-2018 6-Feb-2018 8:40 AM 7-Feb-2018 B comments
Closed
Installation of pvc conduits for Mechanical power system for first Approved w/
379 KHEP-EL-0379
floor at roof slab in Cluster 73 Zone 4B
Cluster 73 Zone 4B Division 26 5-Feb-2018 6-Feb-2018 9:00 AM 7-Feb-2018 B comments
Closed
Installation of PVC Conduits & box for Lighting System for first floor Approved w/
380 KHEP-EL-0380
at roof slab in Cluster 73 Zone 4B
Cluster 73 Zone 4B Division 26 5-Feb-2018 6-Feb-2018 9:10 AM 10-Feb-2018 B comments
Closed
Installation of PVC Conduits & box for Lighting System for roof floor Approved w/
381 KHEP-EL-0381
at roof slab in Cluster 73 Zone 4B
Cluster 73 Zone 4B Division 26 5-Feb-2018 6-Feb-2018 9:20 AM 10-Feb-2018 B comments
Closed
Installation of PVC conduits for power system for ground floor slab in Approved w/
383 KHEP-EL-0383
Cluster 10 Zone 1B
Cluster 10 Zone 1B Division 26 5-Feb-2018 6-Feb-2018 2:00 PM 7-Feb-2018 B comments
Closed
Installation of pvc conduits for Mechanical power system for ground Approved w/
384 KHEP-EL-0384
floor slab in Cluster 10 Zone 1B
Cluster 10 Zone 1B Division 26 5-Feb-2018 6-Feb-2018 2:10 PM 7-Feb-2018 B comments
Closed
Installation of PVC Conduits & box for Lighting System for roof floor Approved w/
385 KHEP-EL-0385
at roof slab in Cluster 33 Zone 2B
Cluster 33 Zone 2B Division 26 6-Feb-2018 7-Feb-2018 8:10 AM 10-Feb-2018 B comments
Closed
Installation of PVC conduits for power system for roof floor at roof
386 KHEP-EL-0386
slab in Cluster 33 Zone 2B
Cluster 33 Zone 2B Division 26 6-Feb-2018 7-Feb-2018 8:20 AM 7-Feb-2018 A Approved Closed
Installation of PVC Conduits & box for Lighting System for first floor Approved w/
388 KHEP-EL-0388
at roof slab in Cluster 33 Zone 2B
Cluster 33 Zone 2B Division 26 6-Feb-2018 7-Feb-2018 8:40 AM 10-Feb-2018 B comments
Closed
Installation of pvc conduits for Mechanical power system for first Approved w/
389 KHEP-EL-0389
floor at roof slab in Cluster 33 Zone 2B
Cluster 33 Zone 2B Division 26 6-Feb-2018 7-Feb-2018 9:00 AM 7-Feb-2018 B comments
Closed
Installation of PVC Conduits & box for Lighting System for ground Approved w/
390 KHEP-EL-0390
floor at first floor slab in Cluster 43 Zone 2A
Cluster 43 Zone 2A Division 26 7-Feb-2018 8-Feb-2018 8:00 AM 10-Feb-2018 B comments
Closed
Installation of PVC conduits for power system for ground floor slab in Approved w/
391 KHEP-EL-0391
Cluster 7 Zone 1B
Cluster 7 Zone 1B Division 26 7-Feb-2018 8-Feb-2018 8:30 AM 10-Feb-2018 B comments
Closed
Installation of blackout foam for conduit installation for panel board Approved w/
394 KHEP-EL-0394
at ground floor in Cluster 56 Zone 3B
Clucter 56 Zone 3B Division 26 7-Feb-2018 10-Feb-2018 8:50 AM 13-Feb-2018 B comments
Closed
Installation of pvc conduits for Mechanical power system for ground Approved w/
395 KHEP-EL-0395
floor in Cluster 43 Zone 2A
Clucter 43 Zone 2A Division 26 10-Feb-2018 11-Feb-2018 1:00 PM 12-Feb-2018 B comments
Closed
Installation of pvc conduits for power system for first floor at first Approved w/
396 KHEP-EL-0396
floor slab in Cluster 43 Zone 2A
Clucter 43 Zone 2A Division 26 10-Feb-2018 11-Feb-2018 1:30 PM 12-Feb-2018 B comments
Closed
Installation of pvc conduits for power system for first floor at first
397 KHEP-EL-0397
floor slab in Cluster 22 Zone 1B
Cluster 22 Zone 1B Division 26 11-Feb-2018 12-Feb-2018 8:30 AM 13-Feb-2018 A Approved Closed
Installation of PVC Conduits & box for Lighting System for ground Approved w/
398 KHEP-EL-0398
floor at first floor slab in Cluster 22 Zone 1B
Cluster 22 Zone 1B Division 26 11-Feb-2018 12-Feb-2018 8:40 AM 13-Feb-2018 B comments
Closed
Installation of pvc conduits for power system for roof floor at roof Approved w/
400 KHEP-EL-0400
slab in Cluster 21 Zone 1B
Cluster 21 Zone 1B Division 26 11-Feb-2018 12-Feb-2018 1:20 PM 13-Feb-2018 B comments
Closed
Installation of PVC Conduits & box for Lighting System for roof floor Approved w/
401 KHEP-EL-0401
at roof slab in Cluster 21 Zone 1B
Cluster 21 Zone 1B Division 26 11-Feb-2018 12-Feb-2018 1:40 PM 13-Feb-2018 B comments
Closed
Installation of pvc conduits for Mechanical power system for first Approved w/
403 KHEP-EL-0403
floor at roof slab in Cluster 21 Zone 1B
Cluster 21 Zone 1B Division 26 11-Feb-2018 12-Feb-2018 2:45 PM 13-Feb-2018 B comments
Closed
Installation of PVC Conduits & box for Lighting System for first floor Approved w/
404 KHEP-EL-0404
at roof slab in Cluster 21 Zone 1B
Cluster 21 Zone 1B Division 26 11-Feb-2018 12-Feb-2018 2:00 PM 13-Feb-2018 B comments
Closed
Installation of pvc conduits for power system for first floor at first
405 KHEP-EL-0405
floor slab in Cluster 24 Zone 2B
Cluster 24 Zone 2B Division 26 12-Feb-2018 13-Feb-2018 9:00 AM 14-Feb-2018 A Approved Closed
Installation of PVC Conduits & box for Lighting System for ground Approved w/
407 KHEP-EL-0407
floor at first floor slab in Cluster 24 Zone 2B
Cluster 24 Zone 2B Division 26 12-Feb-2018 13-Feb-2018 9:20 AM 13-Feb-2018 B comments
Closed
Installation of PVC Conduits & box for Lighting System for ground Approved w/
408 KHEP-EL-0408
floor at first floor slab in Cluster 50 Zone 3B
Cluster 50 Zone 3B Division 26 13-Feb-2018 14-Feb-2018 8:00 AM 14-Feb-2018 B comments
Closed
Installation of pvc conduits for Mechanical power system for ground Approved w/
409 KHEP-EL-0409
floor at first floor slab in Cluster 50 Zone 3B
Cluster 50 Zone 3B Division 26 13-Feb-2018 14-Feb-2018 8:30 AM 17-Feb-2018 B comments
Closed
Installation of pvc conduits for power system for first floor at first
410 KHEP-EL-0410
floor slab in Cluster 50 Zone 3B
Cluster 50 Zone 3B Division 26 13-Feb-2018 14-Feb-2018 8:30 AM 17-Feb-2018 A Approved Closed
Installation of pvc conduits for Mechanical power system for roof Approved w/
411 KHEP-EL-0411
floor at roof slab in Cluster 30 Zone 2B
Cluster 30 Zone 2B Division 26 15-Feb-2018 17-Feb-2018 8:00 AM 18-Feb-2018 B comments
Closed
Installation of pvc conduits for power system for roof floor at roof Approved w/
412 KHEP-EL-0412
slab in Cluster 30 Zone 2B
Cluster 30 Zone 2B Division 26 15-Feb-2018 17-Feb-2018 8:20 AM 18-Feb-2018 B comments
Closed
Installation of PVC Conduits & box for Lighting System for roof floor Approved w/
413 KHEP-EL-0413
at roof slab in Cluster 30 Zone 2B
Cluster 30 Zone 2B Division 26 15-Feb-2018 17-Feb-2018 8:10 AM 18-Feb-2018 B comments
Closed
Installation of PVC Conduits & box for Lighting System for first floor Approved w/
414 KHEP-EL-0414
at roof slab in Cluster 30 Zone 2B
Cluster 30 Zone 2B Division 26 15-Feb-2018 17-Feb-2018 8:30 AM 18-Feb-2018 B comments
Closed
Installation of pvc conduits for Mechanical power system for first Approved w/
415 KHEP-EL-0415
floor at roof slab in Cluster 30 Zone 2B
Cluster 30 Zone 2B Division 26 15-Feb-2018 17-Feb-2018 8:40 AM 18-Feb-2018 B comments
Closed
Installation of pvc conduits for Mechanical power system for ground Approved w/
416 KHEP-EL-0416
floor at first floor slab in Cluster 64 Zone 3B
Cluster 64 Zone 3B Division 26 15-Feb-2018 19-Feb-2018 9:00 AM 19-Feb-2018 B comments
Closed
Installation of pvc conduits for power system for first floor at first
417 KHEP-EL-0417
floor slab in Cluster 64 Zone 3B
Cluster 64 Zone 3B Division 26 18-Feb-2018 19-Feb-2018 9:20 AM 19-Feb-2018 A Approved Closed
Installation of PVC Conduits & box for Lighting System for ground Approved w/
418 KHEP-EL-0418
floor at first floor slab in Cluster 64 Zone 3B
Cluster 64 Zone 3B Division 26 18-Feb-2018 19-Feb-2018 9:10 AM 19-Feb-2018 B comments
Closed
Installation of PVC Conduits & box for Lighting System for first floor
419 KHEP-EL-0419 Cluster 64 Zone 3B Division 26 15-Feb-2018 17-Feb-2018 9:30 AM RECALLED
at roof slab in Cluster 64 Zone 3B
Installation of pvc conduits for Mechanical power system for first
420 KHEP-EL-0420 Cluster 64 Zone 3B Division 26 15-Feb-2018 17-Feb-2018 9:40 AM RECALLED
floor at roof slab in Cluster 64 Zone 3B
Installation of pvc conduits for Mechanical power system for roof
421 KHEP-EL-0421 Cluster 09 Zone 1B Division 26 15-Feb-2018 17-Feb-2018 1:00 PM Open
floor at roof slab in Cluster 09 Zone 1B
Installation of pvc conduits for power system for roof floor at roof
422 KHEP-EL-0422 Cluster 09 Zone 1B Division 26 15-Feb-2018 17-Feb-2018 1:20 PM Open
slab in Cluster 09 Zone 1B
Installation of PVC Conduits & box for Lighting System for roof floor
423 KHEP-EL-0423 Cluster 09 Zone 1B Division 26 15-Feb-2018 17-Feb-2018 1:10 PM Open
at roof slab in Cluster 09 Zone 1B
Installation of PVC Conduits & box for Lighting System for first floor
424 KHEP-EL-0424 Cluster 09 Zone 1B Division 26 15-Feb-2018 17-Feb-2018 1:30 PM Open
at roof slab in Cluster 09 Zone 1B
Installation of pvc conduits for Mechanical power system for first
425 KHEP-EL-0425 Cluster 09 Zone 1B Division 26 15-Feb-2018 17-Feb-2018 1:40 PM Open
floor at roof slab in Cluster 09 Zone 1B
Installation of pvc conduits for Mechanical power system for ground
426 KHEP-EL-0426
floor in Cluster 11 Zone 1B
Cluster 11 Zone 1B Division 26 18-Feb-2018 19-Feb-2018 1:00 AM 19-Feb-2018 A Approved Closed
Installation of pvc conduits for power system for ground floor in Approved w/
427 KHEP-EL-0427
Cluster 11 Zone 1B
Cluster 11 Zone 1B Division 26 18-Feb-2018 19-Feb-2018 1:10 PM 19-Feb-2018 B comments
Closed
Installation of pvc conduits for power system for ground floor in Approved w/
428 KHEP-EL-0428
Cluster 12 Zone 1B
Cluster 11 Zone 1B Division 26 18-Feb-2018 19-Feb-2018 1:20 PM 19-Feb-2018 B comments
Closed
Installation of pvc conduits for Mechanical power system for ground Approved w/
430 KHEP-EL-0430
floor at first floor slab in Cluster 25 Zone 2A
Cluster 25 Zone 2A Division 26 18-Feb-2018 19-Feb-2018 8:00 AM 19-Feb-2018 B comments
Closed
Installation of pvc conduits for power system for first floor slab in
431 KHEP-EL-0431
Cluster 25 Zone 2A
Cluster 25 Zone 2A Division 26 18-Feb-2018 19-Feb-2018 8:20 AM 19-Feb-2018 A Approved Closed
Installation of PVC Conduits & box for Lighting System for ground Approved w/
432 KHEP-EL-0432
floor at first floor slab in Cluster 25 Zone 2A
Cluster 25 Zone 2A Division 26 18-Feb-2018 19-Feb-2018 8:30 AM 19-Feb-2018 B comments
Closed
Installation of PVC Conduits & box for Lighting System for roof floor Approved w/
433 KHEP-EL-0433
at roof slab in Cluster 34 Zone 2B
Cluster 34 Zone 2B Division 26 18-Feb-2018 19-Feb-2018 9:30 AM 19-Feb-2018 B comments
Closed
Installation of PVC Conduits & box for Lighting System for first floor Approved w/
434 KHEP-EL-0434
at roof floor slab in Cluster 34 Zone 2B
Cluster 34 Zone 2B Division 26 18-Feb-2018 19-Feb-2018 9:40 AM 19-Feb-2018 B comments
Closed
Installation of pvc conduits for power system for roof floor at roof
435 KHEP-EL-0435
floor slab in Cluster 34 Zone 2B
Cluster 34 Zone 2B Division 26 18-Feb-2018 19-Feb-2018 9:50 AM 19-Feb-2018 A Approved Closed
Installation of pvc conduits for Mechanical power system for first Approved w/
437 KHEP-EL-0437
floor at first floor slab in Cluster 34 Zone 2B
Cluster 34 Zone 2B Division 26 18-Feb-2018 19-Feb-2018 10:20 AM 19-Feb-2018 B comments
Closed
Installation of pvc conduits for Mechanical power system for first Approved w/
438 KHEP-EL-0438
floor at roof floor slab in Cluster 18 Zone 1B
Cluster 18 Zone 1B Division 26 19-Feb-2018 20-Feb-2018 8:00 AM 21-Feb-2018 B comments
Closed
Installation of pvc conduits for power system for roof floor at roof
440 KHEP-EL-0440
floor slab in Cluster 18 Zone 1B
Cluster 18 Zone 1B Division 26 19-Feb-2018 20-Feb-2018 8:20 AM 21-Feb-2018 A Approved Closed
Installation of PVC Conduits & box for Lighting System for roof floor Approved w/
441 KHEP-EL-0441
at roof floor slab in Cluster 18 Zone 1B
Cluster 18 Zone 1B Division 26 19-Feb-2018 20-Feb-2018 8:40 AM 20-Feb-2018 B comments
Closed
Installation of PVC Conduits & box for Lighting System for first floor Approved w/
442 KHEP-EL-0442
at roof floor slab in Cluster 18 Zone 1B
Cluster 18 Zone 1B Division 26 19-Feb-2018 20-Feb-2018 8:40 AM 20-Feb-2018 B comments
Closed
Installation of pvc conduits for power system for roof floor at roof
443 KHEP-EL-0443
floor slab in Cluster 72 Zone 4B
Cluster 72 Zone 4B Division 26 20-Feb-2018 21-Feb-2018 8:00 AM 21-Feb-2018 A Approved Closed
Installation of PVC Conduits & box for Lighting System for roof floor Approved w/
444 KHEP-EL-0444
at roof floor slab in Cluster 72 Zone 4B
Cluster 72 Zone 4B Division 26 20-Feb-2018 21-Feb-2018 8:10 AM 21-Feb-2018 B comments
Closed
Installation of pvc conduits for Mechanical power system for roof Approved w/
445 KHEP-EL-0445
floor at roof floor slab in Cluster 72 Zone 4B
Cluster 72 Zone 4B Division 26 20-Feb-2018 21-Feb-2018 8:20 AM 21-Feb-2018 B comments
Closed
Installation of 110mm uPVC conduits for panel board & 32 mm uPVC Approved w/
446 KHEP-EL-0446
conduits for grounding system in Cluster 20 Zone 1B
Cluster 20 Zone 1B Division 26 20-Feb-2018 21-Feb-2018 8:20 AM 21-Feb-2018 B comments
Closed
Installation of 110mm uPVC conduits for panel board & 32 mm uPVC Approved w/
447 KHEP-EL-0447
conduits for grounding system in Cluster 19 Zone 1B
Cluster 19 Zone 1B Division 26 20-Feb-2018 21-Feb-2018 1:20 PM 21-Feb-2018 B comments
Closed
Installation of 110mm uPVC conduits for panel board & 32 mm uPVC Approved w/
448 KHEP-EL-0448
conduits for grounding system in Cluster 19 Zone 1B
Cluster 19 Zone 1B Division 26 20-Feb-2018 21-Feb-2018 1:40 PM 24-Feb-2018 B comments
Closed
Installation of 50mm & 75mm PVC sleeves for grounding system & Approved w/
449 KHEP-EL-0449
mechanical power at ground floor in Cluster 29 Zone 2B
Cluster 29 Zone 2B Division 26 21-Feb-2018 22-Feb-2018 8:00 AM 24-Feb-2018 B comments
Closed
Installation of blackout foam for PVC conduits installation for panel Approved w/
450 KHEP-EL-0450
board at ground floor grade beam in Cluster 29 Zone 2B
Cluster 29 Zone 2B Division 26 21-Feb-2018 22-Feb-2018 8:10 AM 24-Feb-2018 B comments
Closed
Installation of pvc conduits for Mechanical power system for roof Approved w/
451 KHEP-EL-0451
floor at roof slab in Cluster 58 Zone 3B
Cluster 58 Zone 3B Division 26 21-Feb-2018 22-Feb-2018 8:20 AM 24-Feb-2018 B comments
Closed
Installation of pvc conduits for Mechanical power system for first Approved w/
452 KHEP-EL-0452
floor at roof slab in Cluster 58 Zone 3B
Cluster 58 Zone 3B Division 26 21-Feb-2018 22-Feb-2018 8:30 AM 24-Feb-2018 B comments
Closed
Installation of pvc conduits for power system for roof floor at roof
453 KHEP-EL-0453
slab in Cluster 58 Zone 3B
Cluster 58 Zone 3B Division 26 21-Feb-2018 22-Feb-2018 8:40 AM 24-Feb-2018 A Approved Closed
Installation of PVC Conduits & box for Lighting System for roof floor Approved w/
454 KHEP-EL-0454
at roof slab in Cluster 58 Zone 3B
Cluster 58 Zone 3B Division 26 21-Feb-2018 22-Feb-2018 8:40 AM 24-Feb-2018 B comments
Closed
Installation of PVC Conduits & box for Lighting System for first floor Approved w/
455 KHEP-EL-0455
at roof slab in Cluster 58 Zone 3B
Cluster 58 Zone 3B Division 26 21-Feb-2018 22-Feb-2018 8:40 AM 24-Feb-2018 B comments
Closed
Installation of PVC Conduits & box for Lighting System for roof floor Approved w/
456 KHEP-EL-0456
at roof slab in Cluster 72 Zone 4B
Cluster 72 Zone 4B Division 26 21-Feb-2018 22-Feb-2018 10:00 AM 24-Feb-2018 B comments
Closed
Installation of pvc conduits for Mechanical power system for roof Approved w/
457 KHEP-EL-0457
floor at roof slab in Cluster 72 Zone 4B
Cluster 72 Zone 4B Division 26 21-Feb-2018 22-Feb-2018 10:10 AM 24-Feb-2018 B comments
Closed
Installation of PVC conduit & box for lighting system for roof floor at
458 KHEP-EL-0458
roof slab in cluster 44
Cluster 44 Zone 2A Division 26 22-Feb-2018 24-Feb-2018 8:10 AM 25-Feb-2018 A Approved Closed
Installation of PVC conduit & box for lighting system for first floor at
459 KHEP-EL-0459
roof slab in cluster 44
Cluster 44 Zone 2A Division 26 22-Feb-2018 24-Feb-2018 8:20 AM 25-Feb-2018 A Approved Closed
Installation of PVC conduit for mechanical power system for first floor Approved w/
460 KHEP-EL-0460
at roof slab in cluster 44
Cluster 44 Zone 2A Division 26 22-Feb-2018 24-Feb-2018 8:30 AM 25-Feb-2018 B comments
Closed
Installation of PVC conduit for mechanical power system for roof Approved w/
461 KHEP-EL-0461
floor at roof slab in cluster 44
Cluster 44 Zone 2A Division 26 22-Feb-2018 24-Feb-2018 8:40 AM 25-Feb-2018 B comments
Closed
Installation of PVC conduit for power system for roof floor at roof
462 KHEP-EL-0462
slab in cluster 44
Cluster 44 Zone 2A Division 26 22-Feb-2018 24-Feb-2018 8:50 AM 25-Feb-2018 A Approved Closed
Installation of PVC conduit & box for lighting system for roof floor at Approved w/
463 KHEP-EL-0463
roof slab in cluster 35
Cluster 35 Zone 2B Division 26 22-Feb-2018 24-Feb-2018 1:10 PM 25-Feb-2018 B comments
Closed
Installation of PVC conduit & box for lighting system for roof floor at Approved w/
464 KHEP-EL-0464
roof slab in cluster 35
Cluster 35 Zone 2B Division 26 22-Feb-2018 24-Feb-2018 1:20 PM 25-Feb-2018 B comments
Closed
Installation of PVC conduit for mechanical power system for first floor Approved w/
465 KHEP-EL-0465
at roof slab in cluster 35
Cluster 35 Zone 2B Division 26 22-Feb-2018 24-Feb-2018 1:30 PM 25-Feb-2018 B comments
Closed
Installation of PVC conduit for mechanical power system for roof Approved w/
466 KHEP-EL-0466
floor at roof slab in cluster 35
Cluster 35 Zone 2B Division 26 22-Feb-2018 24-Feb-2018 1:40 PM 25-Feb-2018 B comments
Closed
Installation of PVC conduit for power system for roof floor at roof Approved w/
467 KHEP-EL-0467
slab in cluster 35
Cluster 35 Zone 2B Division 26 22-Feb-2018 24-Feb-2018 1:50 PM 25-Feb-2018 B comments
Closed
Installation of 110mm uPVC conduits for panel board & 32 mm uPVC Approved w/
470 KHEP-EL-0470
conduits for grounding system in Cluster 16 Zone 1B
Cluster 16 Zone 1B Division 26 24-Feb-2018 25-Feb-2018 8:00 AM 25-Feb-2018 B comments
Closed
Installation of 110mm uPVC conduits for panel board & 32 mm uPVC Approved w/
471 KHEP-EL-0471
conduits for grounding system in Cluster 21 Zone 1B
Cluster 21 Zone 1B Division 26 24-Feb-2018 25-Feb-2018 2:00 PM 25-Feb-2018 B comments
Closed
Installation of 110mm uPVC conduits for panel board & 32 mm uPVC Approved w/
472 KHEP-EL-0472
conduits for grounding system in Cluster 09 Zone 1B
Cluster 09 Zone 1B Division 26 24-Feb-2018 25-Feb-2018 2:10 PM 27-Feb-2018 B comments
Closed
Installation of PVC conduit for mechanical power system for First Approved w/
474 KHEP-EL-0474
floor at roof slab in cluster 23 Zone 1B
Cluster 23 Zone 1B Division 26 24-Feb-2018 25-Feb-2018 1:20 PM 25-Feb-2018 B comments
Closed
Installation of PVC conduit forl power system for Roof floor at roof
475 KHEP-EL-0475
slab in cluster 23 Zone 1B
Cluster 23 Zone 1B Division 26 24-Feb-2018 25-Feb-2018 1:30 PM 25-Feb-2018 A Approved Closed
Installation of PVC conduit & box for lighting system for roof floor at
476 KHEP-EL-0476
roof slab in cluster 23 Zone 1B
Cluster 23 Zone 1B Division 26 24-Feb-2018 25-Feb-2018 1:40 PM 26-Feb-2018 A Approved Closed
Installation of PVC conduit & box for lighting system for First floor at
477 KHEP-EL-0477
roof slab in cluster 23 Zone 1B
Cluster 23 Zone 1B Division 26 24-Feb-2018 25-Feb-2018 1:50 PM 26-Feb-2018 A Approved Closed
Installation of PVC conduit & box for lighting system for First floor at
478 KHEP-EL-0478
roof slab in cluster 60 Zone 3B
Cluster 60 Zone 3B Division 26 24-Feb-2018 25-Feb-2018 9:00 AM 25-Feb-2018 A Approved Closed
Installation of PVC conduit & box for lighting system for Roof floor at
479 KHEP-EL-0479
roof slab in cluster 60 Zone 3B
Cluster 60 Zone 3B Division 26 24-Feb-2018 25-Feb-2018 9:10 AM 25-Feb-2018 A Approved Closed
Installation of pvc conduits for power system for Roof at Roof slab in
480 KHEP-EL-0480
Cluster 60 Zone 3B
Cluster 60 Zone 3B Division 26 24-Feb-2018 25-Feb-2018 9:20 AM 27-Feb-2018 A Approved Closed
Installation of PVC conduit for mechanical power system for Roof Approved w/
481 KHEP-EL-0481
floor at roof slab in cluster 16 Zone 3B
Cluster 60 Zone 3B Division 26 24-Feb-2018 25-Feb-2018 9:30 AM 25-Feb-2018 B comments
Closed
Installation of pvc conduits for power system for first floor at first
486 KHEP-EL-0486
floor slab in Cluster 42 Zone 2B
Cluster 42 Zone 2B Division 26 25-Feb-2018 26-Feb-2018 8:10 AM 27-Feb-2018 A Approved Closed
Installation of PVC conduit for mechanical power system for ground Approved w/
487 KHEP-EL-0487
floor at first floor slab in Cluster 42 Zone 2B
Cluster 42 Zone 2B Division 26 25-Feb-2018 26-Feb-2018 8:20 AM 27-Feb-2018 B comments
Closed
HVAC
Installation of Ducting work supply return & fresh air with fiber glass
insulation & all accessories at ground floor & first floor Installation of
001 KHEP-HVAC-001
ducting work exhaust at ground floor & first floor Zone 4B Cluster 69
Cluster 69 Zone 4B Division 23 8-Jan-2018 9-Jan-2018 10:00 AM 11-Jan-2018 E Rejected Closed
Right Villa
Installation of Ducting work supply return & fresh air with fiber glass
insulation & all accessories at ground floor & first floor Installation of
002 KHEP-HVAC-001-01
ducting work exhaust at ground floor & first floor Zone 4B Cluster 69
Cluster 69 Zone 4B Division 23 17-Jan-2018 18-Jan-2018 10:00 AM 21-Jan-2018 E Rejected Closed
Right Villa
MECHANICAL
Installation of pipe sleeves for the penetration of plumbing pipes on Zone 4B / C-
001 KHEP-ME-001
beams 69(B2)
2-Apr-2017 3-Apr-2017 10:00 AM 4-Apr-2017 A Approved Closed
Installation of pipe sleeves and openings for the penetration of water Zone 4B / C-
002 KHEP-ME-002
supply, ducting, drainage and fire protection pipes on first floor slab 69(B2)
10-May-2017 11-May-2017 10:00 AM 13-May-2017 E Rejected Closed
Installation of pipe sleeves and openings for the penetration of water Zone 4B / C-
002.1 KHEP-ME-002-01
supply, ducting, drainage and fire protection pipes on first floor slab 69(B2)
14-May-2017 15-May-2017 10:00 AM 16-May-2017 A Approved Closed
Installation of Pipe for the Penetration of Fire Protection Pipes on Zone 4B / C- Approved w/
004 KHEP-ME-004
First Floor Slab 69(B2)
14-May-2017 15-May-2017 10:00 AM 16-May-2017 B comments
Closed
Zone 4B / C-
005 KHEP-ME-005 Fixing of Block- outs for the Openings for Ducts on First Floor Slab
69(B2)
14-May-2017 15-May-2017 10:00 AM 16-May-2017 A Approved Closed
Main Line:
From MH1-
L04 ~ MH1-
Inspection of Gravity Test for Sanitary Sewer uPVC Pipes 200mm -
007 KHEP-ME-007
Class 4
L05 Main 20-May-2017 21-May-2017 11:00 AM 23-May-2017 A Approved Closed
Line: From
MH1-L05 ~
MH2-L05
Main Line:
From MH1-
L03 ~ MH1-
L04 (Line #
4) Main Line:
From MH1-
Inspection of Gravity Test for Sanitary Sewer uPVC Pipes 200mm -
008 KHEP-ME-008
Class 4
L04 ~ MH2- 20-May-2017 21-May-2017 11:00 AM 23-May-2017 A Approved Closed
L04 (Line #
4) Main Line:
From MH1-
L03 ~ MH1A-
L03 (Line #
3)
Main Line:
From MH4-
009 KHEP-ME-009 Inspection of Sanitary Sewer uPVC Pipes 200mm - Class 4 L08 ~ MH3- 20-May-2017 21-May-2017 10:30 AM 23-May-2017 A Approved Closed
L08 Length
(9.75m)
Main Line:
From MH2-
L34 ~ MH1-
L34 Length
(13.60m)
Main Line:
From MH1-
010 KHEP-ME-010 Inspection of Sanitary Sewer uPVC Pipes 200mm - Class 4 L34 ~ MHA1- 21-May-2017 22-May-2017 3:00 PM 23-May-2017 A Approved Closed
L34 Length
(22.41m)
Main Line:
From MHA1-
L34 ~ MH7-
L02 Length
(19.74m)
Main Line:
From MH1-
Inspection of Gravity Test for Sanitary Sewer uPVC Pipes 200mm -
011 KHEP-ME-011
Class 4
L08 ~ MH7- 22-May-2017 23-May-2017 11:00 AM 25-May-2017 A Approved Closed
L01 (Line #
8)
Main Line:
From MH3-
L03 ~ MH2-
L03 (Line 3)
Main Line:
Inspection of Gravity Test for Sanitary Sewer uPVC Pipes 200mm - From MH2-
012 KHEP-ME-012
Class 4 L03 ~ MH1-
22-May-2017 23-May-2017 11:00 AM 25-May-2017 A Approved Closed
L03 (Line 3)
Main Line:
From MHA1-
L03 ~ MH5-
L01 (Line 3)
Main Line:
From MH1-
L33 ~ MHA1-
L33 Length
(21.60m)
013 KHEP-ME-013 Installation of Sanitary Sewer uPVC Pipes 200mm - Class 4
Main Line:
23-May-2017 24-May-2017 11:00 AM 25-May-2017 A Approved Closed
From MHA1-
L33 ~ MH1-
L34 Length
(13.75m)
Main Line:
From MH2-
L34 ~ MH1-
L34 (Line 34)
Main Line:
Inspection of Gravity Test for Sanitary Sewer uPVC Pipes 200mm - From MH1-
014 KHEP-ME-014
Class 4 L34 ~ MHA1-
23-May-2017 24-May-2017 11:00 AM 25-May-2017 A Approved Closed
L34 (Line 34)
Main Line:
From MHA1-
L34 ~ MH7-
L02 (Line 34)
Main Line:
From MH1-
L33 ~ MHA1-
Inspection of Gravity Test for Sanitary Sewer uPVC Pipes 200mm - L33 (Line 33)
015 KHEP-ME-015
Class 4 Main Line:
24-May-2017 25-May-2017 11:00 AM 27-May-2017 A Approved Closed
From MHA1-
L34 ~ MH1-
L34 (Line 34)
Main Line:
From MH19-
016 KHEP-ME-016 Installation of Storm Drainage GRP Pipes 500mm L07 ~ MH20- 29-May-2017 30-May-2017 11:00 AM 30-May-2017 A Approved Closed
L07 (Length
59m)
Line 7
(Length
017 KHEP-ME-017 Inspect the Installation lay - out GRP Pipes 500mm 58.061Met) 30-May-2017 31-May-2017 9:30 AM 31-May-2017 A Approved Closed
MH20 L07 to
MH 27 L07
Main Line:
From MH54-
018 KHEP-ME-018 Installation of Storm Drainage GRP Pipes 600mm L15 ~ MH57- 1-Jun-2017 3-Jun-2017 10:30 AM 3-Jun-2017 A Approved Closed
L15 (Length
38.70m)
Main Line:
From MH52-
019 KHEP-ME-019 Installation of Storm Drainage GRP Pipes 500mm L15 ~ MH54- 1-Jun-2017 3-Jun-2017 10:30 AM 3-Jun-2017 A Approved Closed
L15 (Length
51.64m)
Main Line:
From MH3-
L31~ MH2-
L31 Length
(18.32m)
Main Line:
From MH2-
L31 ~ MH1-
L31 Length
(31.49m)
020 KHEP-ME-020 Installation of Sanitary Sewer uPVC Pipes 200mm - Class 4
Main Line:
5-Jun-2017 6-Jun-2017 11:00 AM 7-Jun-2017 A Approved Closed
From MH1-
L31~ MHA1-
L31 Length
(20.1m) Main
Line: From
MHA1-L31 ~
MH9-L02
Length
(22.1m)
Main Line:
From MH1-
021 KHEP-ME-021 Installation of Sanitary Sewer uPVC Pipes 200mm - Class 4 L32~ MH1- 5-Jun-2017 6-Jun-2017 11:00 AM 7-Jun-2017 A Approved Closed
L31 Length
(14.38m)
Main Line:
From MH29-
L07~ MH29a-
L07 Length
(20.37m)
022 KHEP-ME-002 Installation of Storm Drainage GRP Pipes 800mm
Main Line:
5-Jun-2017 6-Jun-2017 10:30 AM 8-Jun-2017 A Approved Closed
From MH29a-
L07~ MH30-
L04 Length
(17.77m)
Main Line:
From MH46-
023 KHEP-ME-023 Installation of Storm Drainage GRP Pipes 500mm L15~ MH47- 6-Jun-2017 7-Jun-2017 10:30 AM 8-Jun-2017 A Approved Closed
L15 Length
(43.71m)
Line 31 MH9-
L02 to MHA1-
L31 and
MH1-L31 to
Inspection of Gravity Test for Sanitary Sewer uPVC Pipes 200mm -
024 KHEP-ME-024
Class 4
MH1A-L31 10-Jun-2017 11-Jun-2017 9:30 AM 12-Jun-2017 A Approved Closed
MH2-L31 to
MH1-L31 and
MH1-L32 to
MH1-L31
Site Store
025 KHEP-ME-025 Inspection of GRP Sanitary Swear Manhole Sample
Area
10-Jun-2017 11-Jun-2017 9:00 AM 11-Jun-2017 E Rejected Closed
Zone
Installation of Horizontal Pipe Sleeves for the Penetration of
026 KHEP-ME-026
Drainage and Water Supply Piping on Grade Beams
1B,Cluster 10-Jun-2017 11-Jun-2017 10:00 AM 12-Jun-2017 A Approved Closed
13, B2
Zone
Installation of Horizontal Pipe Sleeves for the Penetration of
027 KHEP-ME-027
Drainage and Water Supply Piping on Grade Beams
1B,Cluster 10-Jun-2017 11-Jun-2017 10:00 AM 12-Jun-2017 A Approved Closed
15, B2
Zone
Installation of Vertical Pipe Sleeves for the Penetration of Vent,
028 KHEP-ME-028
Condensate, and Rainwater Drainage on Roof Floor
4B,Cluster 12-Jun-2017 13-Jun-2017 10:00 AM 13-Jun-2017 A Approved Closed
69, B2
Zone
029 KHEP-ME-029 Fixing of Block- outs for the Openings for Air Ducts on Roof Floor 4B,Cluster 12-Jun-2017 13-Jun-2017 10:00 AM 13-Jun-2017 A Approved Closed
69, B2
Zone
Installation of Horizontal Pipe Sleeves for the Penetration of
030 KHEP-ME-030
Drainage and Water Supply Piping on Grade Beams
1B,Cluster 13-Jun-2017 14-Jun-2017 10:00 AM 14-Jun-2017 A Approved Closed
12, B2
Zone
Installation of Horizontal Pipe Sleeves for the Penetration of
031 KHEP-ME-031
Drainage and Water Supply Piping on Grade Beams
1B,Cluster 13-Jun-2017 14-Jun-2017 10:15 AM 14-Jun-2017 A Approved Closed
14, B2
Main Line:
From MH28-
032 KHEP-ME-032 Installation of Storm Drainage GRP Pipes 700mm L07 ~ MH29- 15-Jun-2017 17-Jun-2017 10:30 AM 17-Jun-2017 A Approved Closed
L07 (Length
45m)
Main Line:
From MH21-
L01~ MH20-
L01 Length
(32.65m)
033 KHEP-ME-033 Installation of Sanitary Sewer uPVC Pipes 200mm - Class 4
Main Line:
15-Jun-2017 17-Jun-2017 11:00 AM 17-Jun-2017 A Approved Closed
From MH20-
L01~ MH19-
L01 Length
(27.122m)
Main Line:
Inspection of Gravity Test for Sanitary Sewer uPVC Pipes 200mm - From MH3-
034 KHEP-ME-034
Class 4 L31~ MH2-
17-Jun-2017 18-Jun-2017 9:00 AM 19-Jun-2017 A Approved Closed
L31, Line 31
Main Line:
From MH19-
L01~ MH18-
L01 Length
(33.33m)
035 KHEP-ME-035 Installation of Sanitary Sewer uPVC Pipes 200mm - Class 4
Main Line:
17-Jun-2017 18-Jun-2017 10:30 AM 19-Jun-2017 A Approved Closed
From MH18-
L01~ MH17-
L01 Length
(38.819m)
Main Line:
From MH21-
L01~ MH20-
L01 Line 1
Main Line:
From MH20-
L01~ MH19-
Inspection of Gravity Test for Sanitary Sewer uPVC Pipes 200mm - L01 Line 1
036 KHEP-ME-036
Class 4 Main Line:
19-Jun-2017 20-Jun-2017 9:30 AM 22-Jun-2017 A Approved Closed
From MH19-
L01~ MH18-
L01 Line 1
Main Line:
From MH18-
L01~ MH17-
L01 Line 1
Main Line:
From MH114-
L27~
MH111a-L27
Length
(11.79m)
Main Line:
From
MH111a-
037 KHEP-ME-037 Installation of Storm Drainage GRP Pipes 700mm
L27~ MH111-
19-Jun-2017 20-Jun-2017 10:30 AM 22-Jun-2017 E Rejected Closed
L27 Length
(43.48m)
Main Line:
From MH111-
L27~
MH110a-L27
Length
(49.886m)
Zone 4B,
Installation of Horizontal Pipe Sleeves for the Penetration of
038 KHEP-ME-038
Drainage and Water Supply Piping on Grade Beams
Cluster 68, 28-Jun-2017 29-Jun-2017 10:00 AM 29-Jun-2017 A Approved Closed
B2
Main Line:
From MH17-
L01~ MH16-
L01 Length
(38.96m) Approved w/
039 KHEP-ME-039 Installation of Sanitary Sewer uPVC Pipes 200mm - Class 4
Main Line:
28-Jun-2017 29-Jun-2017 3:00 PM 29-Jun-2017 B comments
Closed
From MH16-
L01~ MH15-
L01 Length
(64.516m)
Main Line:
From MH17-
L01~ MH16-
Inspection of Gravity Test for Sanitary Sewer uPVC Pipes 200mm - L01 Line 1
044 KHEP-ME-044
Class 4 Main Line:
1-Jul-2017 2-Jul-2017 10:30 AM 3-Jul-2017 A Approved Closed
From MH16-
L01~ MH15-
L01 Line 1
047 KHEP-ME-047 Line 2, Main Line: From MH22-L02~ MH21-L02 and Main Line 2 NA Division 33 3-Jul-2017 4-Jul-2017 3:00 PM 4-Jul-2017 A Approved Closed
Line: From MH21-L02~ MH20-L02 and Main Line: From MH20-L02~
MH19-L02
Installation of Sanitary Sewer uPVC Pipes 200mm - Class 4
055 KHEP-ME-055 Line 7, Main Line: From MH62-L18 ~ MH63-L18 (500mm) Main Line: Line 18 NA Division 33 10-Jul-2017 11-Jul-2017 10:00 AM 12-Jul-2017 A Approved Closed
From MH63-L18 ~ MH64-L18 (500mm) Main Line: From MH64-L18 ~
MH74-L18 (600mm)
Zone 2B, Line 30 & 29, Main Line: From MH3-L30~ MH2- Approved w/
057 KHEP-ME-057
L30 and Main Line: From MH2-L30~ MH1-L30 and Main Line: From
Line 30 & 29 Zone 2B Division 33 12-Jul-2017 12-Jul-2017 11:00 AM 15-Jul-2017 B comments
Closed
MH1-L30~ MH1a-L30 and MH1a-L30~ MH11-L02 and MH1-L29~
MH1a-L29 and MH1a-L29~ MH1-L30
Installation of Storm Drainage GRP Pipes 500mm Line
058 KHEP-ME-058 22, Main Line: From MH89-L22 ~ MH90-L22 (500mm) Main Line: Line 22 NA Division 33 13-Jul-2017 15-Jul-2017 10:00 AM 15-Jul-2017 E Rejected Closed
From MH90-L18 ~ MH91-L18 (500mm)
Installation of Storm Drainage GRP Pipes 500mm Line
Approved w/
058.1 KHEP-ME-058-01 22, Main Line: From MH89-L22 ~ MH90-L22 (500mm) Main Line: Line 22 NA Division 33 16-Jul-2017 17-Jul-2017 10:00 AM 18-Jul-2017 B comments
Closed
From MH90-L22 ~ MH91-L22 (500mm)
Installation of Sanitary Sewer uPVC Pipes 200mm - Class 4
Zone 2B, Line 12 & 11, Main Line: From MH3-L12~ MH2-
059 KHEP-ME-059
L12 and Main Line: From MH2-L12~ MH1-L12 and Main Line: From
Line 12 & 11 Zone 2B Division 33 15-Jul-2017 16-Jul-2017 3:00 PM 17-Jul-2017 A Approved Closed
MH1-L12~ MH12-L01 and MH1-L11~ MH1a-L11 and MH1a-L11~
MH2-L12
Installation of Storm Drainage GRP Pipes 400mm Line
060 KHEP-ME-060
10, Main Line: From MH31-L10 ~ MH32-L10 (400mm)
Line 10 NA Division 33 15-Jul-2017 16-Jul-2017 10:00 AM 17-Jul-2017 A Approved Closed
Zone 2B, Line 27 & 28, Main Line: From MH-5-L27~ MH-
Approved w/
065 KHEP-ME-065 4-L27 and MH-4-L27~ MH-3-L27 and Main Line: From MH-3-L27~ Line 27 & 28 Zone 2B Division 33 17-Jul-2017 18-Jul-2017 3:00 PM 19-Jul-2017 B comments
Closed
MH-2-L27 and MH-2-L27~ MH-1-L27 and MH-1-L27~ MH-13-L02
and Main Line: From MH-1-L28~ MH-1a-L28 and MH-1a-L28~ MH-2-
L27
Inspection of Gravity Test for Sanitary Sewer uPVC Pipes 200mm -
Class 4
066 KHEP-ME-066
Line 30, Main Line: From MH-1-L30~ MH-1a-L30 and Main Line:
Line 30 NA Division 33 18-Jul-2017 19-Jul-2017 9:30 AM 20-Jul-2017 E Rejected Closed
From MH-1a-L30~ MH-11-L02
Inspection of Gravity Test for Sanitary Sewer uPVC Pipes 200mm -
Class 4
066.1 KHEP-ME-066-01
Line 30, Main Line: From MH-1-L30~ MH-1a-L30 and Main Line:
Line 30 NA Division 33 20-Jul-2017 22-Jul-2017 9:30 AM 23-Jul-2017 A Approved Closed
From MH-1a-L30~ MH-11-L02
Inspection of Gravity Test for Sanitary Sewer uPVC Pipes 200mm -
Class 4
067 KHEP-ME-067 Line 11 & 12, Main Line: From MH-1-L11~ MH-1a-L11 and Main Line 11 & 12 NA Division 33 18-Jul-2017 19-Jul-2017 9:30 AM 20-Jul-2017 E Rejected Closed
Line: From MH-1a-L11~ MH-12-L12 and Main Line: From MH-3-
L12~ MH-2-L12
Inspection of Gravity Test for Sanitary Sewer uPVC Pipes 200mm -
Class 4
067.1 KHEP-ME-067-01 Line 11 & 12, Main Line: From MH-1-L11~ MH-1a-L11 and Main Line 11 & 12 NA Division 33 20-Jul-2017 22-Jul-2017 9:30 AM 23-Jul-2017 A Approved Closed
Line: From MH-1a-L11~ MH-12-L12 and Main Line: From MH-3-
L12~ MH-2-L12
079 KHEP-ME-079 Zone 2B, Line 2, Main Line: From MH-14-L02~ MH-13-L02 Line 2 Zone 2B Division 33 25-Jul-2017 26-Jul-2017 11:00 AM 27-Jul-2017 E Rejected Closed
and MH-13-L02~ MH-12-L02 and Main Line: From MH-12-L02~ MH-
11-L02
Installation of Sanitary Sewer uPVC Pipes 200mm - Class 4
079.1 KHEP-ME-079-01 Zone 2B, Line 2, Main Line: From MH-14-L02~ MH-13-L02 Line 2 Zone 2B Division 33 27-Jul-2017 29-Jul-2017 11:00 AM 30-Jul-2017 A Approved Closed
and MH-13-L02~ MH-12-L02 and Main Line: From MH-12-L02~ MH-
11-L02
Installation of Vertical Pipe Sleeves for the Penetration of Vent Pipes
at the Stair landing Area Between Ground and First Floor
080 KHEP-ME-080
Zone 1B, Cluster
Cluster 14 B2 Zone 1B Division 22 26-Jul-2017 27-Jul-2017 10:00 AM 27-Jul-2017 A Approved Closed
14, B2
Installation of Sanitary sewer uPVC Pipes 200mm - Class 4
Approved w/
081 KHEP-ME-081 Line 2, Line 2 Zone 2B Division 33 26-Jul-2017 27-Jul-2017 3:00 PM 27-Jul-2017 B comments
Closed
MH-11-L02 - MH-10-L02 and MH-10-L02 - MH-9-L02
Inspection of Gravity Test for Sanitary Sewer uPVC Pipes 200mm -
Class 4
Approved w/
082 KHEP-ME-082 Line 27 & 28, Main Line: From MH-1-L27~ MH-13-L02 and Main Line 27 & 28 NA Division 33 29-Jul-2017 30-Jul-2017 11:00 AM 31-Jul-2017 B comments
Closed
Line: From MH-1-L28~ MH-1a-L28 and Main Line: From MH-1a-L28~
MH-2-L27
Installation of Storm Drainage GRP pipes 400mm
Line 13, Main Line: From Approved w/
083 KHEP-ME-083
MH-I39-L13~ MH-I40-L13 and Main Line: From MH-I40-L13~ MH-
Line 13 NA Division 33 29-Jul-2017 30-Jul-2017 3:15 PM 31-Jul-2017 B comments
Closed
I41-L13
Installation of Sanitary sewer uPVC Pipes 200mm - Class 4
Zone 2B,
Approved w/
084 KHEP-ME-084 Line 1, Main Line: from MH-11-L01 - MH-10-L01 and Main Line: Line 1 Zone 2B Division 33 30-Jul-2017 31-Jul-2017 11:00 AM 1-Aug-2017 B comments
Closed
from MH-10-L01 - MH-9-L01 and Main Line: from MH-9-L01 - MH-8-
L01
Inspection of Gravity Test for Sanitary Sewer uPVC Pipes 200mm -
Class 4
Line 2, Main Line: From MH-14-L02~ MH-13-L02 and Main Line: Approved w/
085 KHEP-ME-085
From MH-13-L02~ MH-12-L02 and Main Line: From MH-12-L02~
Line 2 NA Division 33 31-Jul-2017 1-Aug-2017 11:00 AM 2-Aug-2017 B comments
Closed
MH-11-L02 and Main Line: From MH-11-L02~ MH-10-L02 and MH-
10-L02~ MH-09-L02
Installation of Storm Drainage GRP pipes 400mm
Line 13, Main Line: From Approved w/
086 KHEP-ME-086
MH-I41-L13~ MH-I42-L13 400mm and Main Line: From MH-I42-
Line 13 NA Division 33 31-Jul-2017 1-Aug-2017 3:15 PM 2-Aug-2017 B comments
Closed
L13~ MH-45-L13 400mm
Installation of Vertical Pipe Sleeves for the Penetration of Drainage
and Water supply piping, Mechanical Openings at First Floor Division 22 &
087 KHEP-ME-087
Zone
Cluster 13 B2 Zone 1B
23
1-Aug-2017 2-Aug-2017 10:00 AM 3-Aug-2017 A Approved Closed
1B, Cluster 13, B2
Installation of Vertical Pipe Sleeves for the Penetration of Vent Pipes
at the Stair landing Area Between Ground and First Floor
088 KHEP-ME-088
Zone 1B,
Cluster 12 B2 Zone 1B Division 22 1-Aug-2017 2-Aug-2017 10:15 AM 3-Aug-2017 A Approved Closed
Cluster 12, B2
Installation of Storm Drainage GRP pipes 400mm
089 KHEP-ME-089 Zone 1B, Line 16, Main Line 16 Zone 1B Division 33 2-Aug-2017 3-Aug-2017 11:00 AM 5-Aug-2017 A Approved Closed
Line: From MH-I53-L16~ MH-54-L15 (400mm)
Installation of Riser Pipes for Domestic Cold Hot Water Supply Line
for Kitchen sink embedded on Wall (without any piping accessories)
172 KHEP-ME-172
Located at Ground floor As Highlighted
Cluster 69, B2 Zone 4B Division 22 2-Oct-2017 3-Oct-2017 2:00 PM 3-Oct-2017 A Approved Closed
Zone 4B, Cluster 69, B2 Left Villa
Installation of FCU Condensate Drain Riser pipe embedded on wall
173 KHEP-ME-173 Located at Kitchen Ground floor As Highlighted Cluster 69, B2 Zone 4B Division 23 3-Oct-2017 4-Oct-2017 10:30 AM 5-Oct-2017 A Approved Closed
Zone 4B, Cluster 69, B2 Left Villa
Installation of Vertical Pipe Sleeves for the Penetration of Roof
Drain,Condensate Drain, Vent Pipes, and Block-Outs for Mechanical Division 22 &
174 KHEP-ME-174
Opening on the Roof Floor slab
Cluster 12 B2 Zone 1B
23
3-Oct-2017 4-Oct-2017 10:00 AM 5-Oct-2017 A Approved Closed
Zone 1B, Cluster 12, B2
Installation of storm drainage GRP pipes from main line to Manhole
175 KHEP-ME-175 (Short piece) 400mm Zone 1B, Line Line 13 Zone 1B Division 33 3-Oct-2017 4-Oct-2017 11:30 AM 5-Oct-2017 A Approved Closed
13, MH-I42-L13
Installation of Vertical Pipe Sleeves for the Penetration of Roof
Drain,Condensate Drain, Vent Pipes, and Block-Outs for Mechanical Division 22 &
176 KHEP-ME-176
Opening on the Roof Floor slab
Cluster 13 B2 Zone 1B
23
4-Oct-2017 5-Oct-2017 10:00 AM 5-Oct-2017 A Approved Closed
Zone 1B, Cluster 13, B2
Installation of storm drainage GRP pipes From main line to manhole
177 KHEP-ME-177 (short piece) 400mm Zone1B, Line Line 16 Zone1B Division 33 5-Oct-2017 7-Oct-2017 11:30 AM 7-Oct-2017 A Approved Closed
16, Main line: From MH-I53-L16
Installation of Vertical Pipe Sleeves for the Penetration of Roof
Drain,Condensate Drain, Vent Pipes, and Block-Outs for Mechanical Division 22 &
178 KHEP-ME-178
Opening on the Roof Floor slab
Cluster 10 B2 Zone 1B,
23
8-Oct-2017 9-Oct-2017 10:00 AM 9-Oct-2017 A Approved Closed
Zone 1B, Cluster 10, B2
Installation of Vertical Pipe Sleeves for the Penetration of Roof
Drain,Condensate Drain, Vent Pipes, and Block-Outs for Mechanical Division 22 &
179 KHEP-ME-179
Opening on the Roof Floor slab
Cluster 11 B2 Zone 1B,
23
8-Oct-2017 9-Oct-2017 10:30 AM 9-Oct-2017 A Approved Closed
Zone 1B, Cluster 11, B2
Installation of Horizontal Pipe Sleeves for the Penetration of Water
Cluster 44,
180 KHEP-ME-180 Supply piping on Grade Beams Ground Floor
A6
Zone 4A Division 22 8-Oct-2017 9-Oct-2017 11:00 AM 10-Oct-2017 E Rejected Closed
Zone 4A, Cluster 44, A6
Installation of Horizontal Pipe Sleeves for the Penetration of Water
Cluster 44,
180.1 KHEP-ME-180-01 Supply piping on Grade Beams Ground Floor
A7
Zone 4A Division 23 15-Oct-2017 16-Oct-2017 10:00 AM 17-Oct-2017 A Approved Closed
Zone 4A, Cluster 44, A6
Installation of underground drainage system (soil and waste line)
181 KHEP-ME-181 below ground floor stuctural Slab Zone 1A, Cluster 01 A6 Zone 1A Division 33 9-Oct-2017 10-Oct-2017 10:00 AM 11-Oct-2017 A Approved Closed
Cluster 1, A6
Installation of underground drainage system (soil and waste line)
182 KHEP-ME-182 below ground floor stuctural Slab Zone 1A, Cluster 01 A6 Zone 1A Division 22 10-Oct-2017 11-Oct-2017 10:00 AM 12-Oct-2017 A Approved Closed
Cluster 1, A6 Villa 4
Installation of storm drainage GRP Pipes 600mm Zone
3B, Main
183 KHEP-ME-183
Line: MH-71-L20 to MH-I72-L20 600mm Main
N/A Zone 3B Division 33 10-Oct-2017 11-Oct-2017 11:30 AM 12-Oct-2017 A Approved Closed
Line: MH-72-L20 to MH-I73-L19 600mm
Installation of Vertical Pipe Sleeves for the Penetration of Vent
Pipesat the Stair Landing Area between Ground and First Floor
184 KHEP-ME-184
Zone 1B,
Cluster 8, B2 Zone 1B Division 22 11-Oct-2017 12-Oct-2017 10:00 AM 14-Oct-2017 A Approved Closed
Cluster 8, B2
Installation of Vertical Pipe Sleeves for the Penetration of Vent
Pipesat the Stair Landing Area between Ground and First Floor
185 KHEP-ME-185
Zone 3B,
Cluster 61, B2 Zone 3B Division 22 12-Oct-2017 14-Oct-2017 10:00 AM 14-Oct-2017 A Approved Closed
Cluster 61, B2
Installation of Vertical Pipe Sleeves for the Penetration of Vent
Pipesat the Stair Landing Area between Ground and First Floor Cluster 16
186 KHEP-ME-186
Zone 1B, BC4
Zone 1B Division 22 12-Oct-2017 14-Oct-2017 10:30 AM 14-Oct-2017 A Approved Closed
Cluster 16, BC4
Installation of storm drainage GRP pipes 400mm Zone
5C, Line 34, Main line: From MH-128-L34 ~ MH-129-L34 and Main
187 KHEP-ME-187
line: From MH-129-L34 ~ MH-130-L34 and Main line: From MH-130-
Line 34 Zone 5C Division 33 12-Oct-2017 14-Oct-2017 11:30 AM 14-Oct-2017 A Approved Closed
L34 ~ MH-131-L34
Inspection and Witnessing the Gravity Testing of Underground
Dranage System (UPVC) Installed Inside the Building As Highlighted
188 KHEP-ME-188
Zone 1A, Cluster
Cluster 01 A6 Zone 1A Division 22 12-Oct-2017 14-Oct-2017 10:00 AM 14-Oct-2017 A Approved Closed
1, A6, Villa 3
Inspection and Witnessing the Gravity Testing of Underground
Dranage System (UPVC) Installed Inside the Building As Highlighted
189 KHEP-ME-189
Zone 1A, Cluster
Cluster 01 A6 Zone 1A Division 22 12-Oct-2017 14-Oct-2017 10:30 AM 14-Oct-2017 A Approved Closed
1, A6, Villa 4
Installation of Underground Drainage System (Soil and Waste pipe
Approved w/
190 KHEP-ME-190 Line) Below Ground Floor Structural Slab Cluster 01 A6 Zone 1A Division 22 15-Oct-2017 16-Oct-2017 10:30 AM 16-Oct-2017 B comments
Closed
Zone 1A, Cluster 1, A6, Villa 5
Installation of Underground Drainage System (Soil and Waste uPVC
Approved w/
191 KHEP-ME-191 pipe Line) Below Ground Floor Structural Slab Cluster 15 B2 Zone 1B Division 22 16-Oct-2017 17-Oct-2017 10:30 AM 19-Oct-2017 B comments
Closed
Zone 1B, Cluster 15, B2, Right Villa
Inspection and Witnessing the Gravity Testing of Underground
Drainage System (UPVC) Installed Inside the Building As Highlighted Approved w/
192 KHEP-ME-192
Zone 1A,
Cluster 01 A6 Zone 1A Division 22 16-Oct-2017 17-Oct-2017 10:00 AM 19-Oct-2017 B comments
Closed
Cluster 1, A6, Villa 5
Inspection and Witnessing the Gravity Lake Test of Underground
Drainage System (UPVC) Installed Inside the Building As Highlighted
193 KHEP-ME-193
Zone 1B, Cluster 15, B2,
Cluster 15 B2 Zone 1B Division 22 18-Oct-2017 19-Oct-2017 10:00 AM 19-Oct-2017 A Approved Closed
Right Villa
Installation of Horizontal Pipe Sleeves for the Penetration of Water
Cluster 43,
194 KHEP-ME-194 Supply piping on Grade Beams Ground Floor
A6
Zone 2A Division 22 19-Oct-2017 21-Oct-2017 10:00 AM 21-Oct-2017 A Approved Closed
Zone 2A, Cluster 43, A6
Installation of Vertical Pipe Sleeves for the Penetration of Roof
Drain,Condensate Drain, Vent Pipes, and Block-Outs for Mechanical Division 22 &
195 KHEP-ME-195
Opening on the Roof Floor slab
Cluster 68, B2 Zone 4B
23
19-Oct-2017 21-Oct-2017 10:30 AM 22-Oct-2017 A Approved Closed
Zone 4B, Cluster 68, B2
Installation of Vertical Pipe Sleeves for the Penetration of Vent Pipes
at the Stair Landing Area between Ground and First Floor Cluster 6,
196 KHEP-ME-196
Zone 1B, Cluster 6, BC4
Zone 1B Division 22 21-Oct-2017 22-Oct-2017 10:00 AM 23-Oct-2017 A Approved Closed
BC4
Installation of Vertical Pipe Sleeves for the Penetration of Vent Pipes
at the Stair Landing Area between Ground and First Floor
197 KHEP-ME-197
Zone 3B, Cluster 48,
Cluster 48, B2 Zone 3B Division 22 21-Oct-2017 22-Oct-2017 10:30 AM 23-Oct-2017 A Approved Closed
B2
Installation of Vertical Pipe Sleeves for the Penetration of Roof
Drain,Condensate Drain, Vent Pipes, and Block-Outs for Mechanical Division 22 &
198 KHEP-ME-198
Opening on the Roof Floor slab
Cluster 17 B2 Zone 1B
23
21-Oct-2017 22-Oct-2017 11:00 AM 24-Oct-2017 A Approved Closed
Zone 1B, Cluster 17, B2
Inspection for Gravity test for sanitary sewer uPVC pipes 200mm,
243 KHEP-ME-243 Class 4 Zone Line 1 Zone 1B Division 33 11-Nov-2017 12-Nov-2017 8:30 AM 13-Nov-2017 A Approved Closed
1B, Line 1, Main Line : from MH-22-L01 ~ MH-21-L01
Installation of Sanitary sewer uPVC Pipes From Inspection Chamber
to manhole (Embedded pice) 160mm - Class 4 Zone 1B, Line 3 &
Line 3 & 4 &
244 KHEP-ME-244 4 & 5 & 6 & 7 & 8, MH-2-L03 and MH-3-L03 and MH-2-L04 and MH-
5&6&7&8
Zone 1B Division 33 12-Nov-2017 13-Nov-2017 10:30 AM 14-Nov-2017 A Approved Closed
1-L04 and MH-1-L06 and MH-2-L05 and MH-1-L05 and MH-1-L07
and MH-1-L08 and MH-3-L08 and MH-4-L08
Installation of Gully Traps for Balcony Drains at First Floor Cluster 6, Approved w/
255 KHEP-ME-255
Zone 1B, Cluster 6, BC4 BC4
Zone 1B Division 22 18-Nov-2017 19-Nov-2017 10:30 AM 20-Nov-2017 B comments
Closed
Inspection for Gravity Test Back Drop for Sanitary sewer uPVC Pipes
351.1 KHEP-ME-351-01
160mm Class 4 Zone 1B Line 3 MH-1A-L03
Zone 1B Line 3 Division 33 30-Dec-2017 31-Dec-2017 9:00 AM 1-Jan-2018 E Rejected Closed
Inspection for Gravity Test Back Drop for Sanitary sewer uPVC Pipes
351.2 KHEP-ME-351-02
160mm Class 4 Zone 1B Line 3 MH-1A-L03
Zone 1B Line 3 Division 33 2-Jan-2018 3-Jan-2018 9:10 AM 4-Jan-2018 A Approved Closed
Inspection for Gravity Test for Sanitary sewer uPVC Pipes 200mm
352 KHEP-ME-352 Class 4 Zone 1B Line 34 MH-2-L34 MH-1-L34 & MH-1-L34 MH-1A- Zone 1B Line 34 Division 33 27-Dec-2017 28-Dec-2017 9:45 AM 30-Dec-2017 E Rejected Closed
L34
Inspection for Gravity Test for Sanitary sewer uPVC Pipes 200mm
352.1 KHEP-ME-352-01 Class 4 Zone 1B Line 34 MH-2-L34 MH-1-L34 & MH-1-L34 MH-1A- Zone 1B Line 34 Division 33 30-Dec-2017 31-Dec-2017 9:10 AM 1-Jan-2018 A Approved Closed
L34
Installation of Embedded PPR on the wall for water supply system at
353 KHEP-ME-353 first floor Hot & Cold Master bedroom Axis 5,6 E,D Zone 4B Cluster Cluster 69 B2 Zone 4B Division 22 28-Dec-2017 30-Dec-2017 8:50 AM 31-Dec-2017 A Approved Closed
69 B2
Insoection for Gravity Test for Sanitary sewer uPVC Pipes 200mm
370 KHEP-ME-370 Class Short Piec at Zone 1B Line 31 MH-3-L31 to MH-2-L31 to MH-1- Line 31 Zone 1B Division 33 1-Jan-2018 2-Jan-2018 9:15 AM 4-Jan-2018 A Approved Closed
L31 to MH-1-A-L31
Installation uPVC Pipe ofFloor Drain Connection for Drainage System
371 KHEP-ME-371 at Ground Floor West Vent CD Villa 6 as highlighted Section Axis 1,6 Cluster 02 A6 Zone 1A Division 22 4-Jan-2018 6-Jan-2018 9:10 AM 7-Jan-2018 A Approved Closed
A,C Zone 1A Cluster 2 A6
Installation uPVC Pipe of FD Connection for Drainage System at
372 KHEP-ME-372 Ground Floor West Vent CD Villa 5 as highlighted Section Axis 1,6 Cluster 02 A6 Zone 1A Division 22 3-Jan-2018 4-Jan-2018 9:10 AM 7-Jan-2018 A Approved Closed
C,E Zone 1A Cluster 2 A6
Installation uPVC Pipe of FD Connection for Drainage System at
373 KHEP-ME-373 Ground Floor West Vent CD Villa 4 as highlighted Section Axis 1,6 Cluster 02 A6 Zone 1A Division 22 3-Jan-2018 4-Jan-2018 9:15 AM 6-Jan-2018 A Approved Closed
E,G Zone 1A Cluster 2 A6
Installation uPVC Pipe of FD Connection for Drainage System at
374 KHEP-ME-374 Ground Floor West Vent CD Villa 3 as highlighted Section Axis 1,6 G,I Cluster 02 A6 Zone 1A Division 22 3-Jan-2018 4-Jan-2018 9:20 AM 6-Jan-2018 A Approved Closed
Zone 1A Cluster 2 A6
Inspection of Gravity Test for Sanitary Sewer UPVC Pipes 200mm
375 KHEP-ME-375 Class 4 Short Pics Zone 1B Line 5 MH-1-L04 - MH-1-L05 & MH-1-L05 Line 5 Zone 1B Division 33 3-Jan-2018 4-Jan-2018 9:00 AM 9-Jan-2018 A Approved Closed
MH-2-L05
Installation UPVC Pipe Rizer From Roof Floor to Ground Floor for
376 KHEP-ME-376 Drainage System Rain Water Pipe as higlighted section Zone 1A Cluster 02 A6 Zone 1A Division 22 3-Jan-2018 4-Jan-2018 10:00 AM 6-Jan-2018 A Approved Closed
Cluster 2 A6
Installation of Gravity Traps for Balcony Drains at First Floor as Cluster 21
377 KHEP-ME-377
Highlighted Zone 2B Cluster 21 BC4 BC4
Zone 2B Division 22 3-Jan-2018 4-Jan-2018 10:10 AM 7-Jan-2018 A Approved Closed
Inspection for Gravity test for Sanitary sewer UPVC Pipes 200mm
380 KHEP-ME-380
Class 4 short Piec at Zone 5A Line 1 MH-5-L01 to MH-6-L01
Line 1 Zone 5A Division 33 4-Jan-2018 6-Jan-2018 9:15 AM 7-Jan-2018 A Approved Closed
Inspection for Leak test for Sanitary Sewer Manholes Zone 1B Line
381 KHEP-ME-381 33 MH-1-L33 MH-1A-L33 & Line 34 MH-1-L34 MH-2-L34 MH-2-L34 Line 33, 34 Zone 1B Division 33 4-Jan-2018 6-Jan-2018 9:15 AM 7-Jan-2018 A Approved Closed
MH-1A-L34
Inspection for Leak test for Sanitary Sewer Manholes Zone 1B Line
382 KHEP-ME-382
31 MH-1-L31 MH-1-A-L31 MH-2-L31 MH-2-L31 Zone 1B
Line 31 Zone 1B Division 33 6-Jan-2018 7-Jan-2018 9:10 AM 9-Jan-2018 E Rejected Closed
Inspection for Leak test for Sanitary Sewer Manholes Zone 1B Line 3
383 KHEP-ME-383
MH-3-L03 MH-2-L03 MH-1-L03 Line 4 MH-2-L04 Mh-1-L04 Zone 1B
Line 3, 4 Zone 1B Division 33 6-Jan-2018 7-Jan-2018 9:15 AM 9-Jan-2018 E Rejected Closed
Gravity Test for uPVC Pipe waste Floor Drain connection & waste
384 KHEP-ME-384 Pipe for Drainage System at Ground Floor Waste, FD, CD Villa 6 as Cluster 02 A6 Zone 1A Division 22 7-Jan-2018 8-Jan-2018 9:00 AM 9-Jan-2018 A Approved Closed
highlighted sections Axis 1,6 A,C Zone 1A Cluster 2 A6
Gravity Test for uPVC Pipe waste Floor Drain connection & waste
385 KHEP-ME-385 Pipe for Drainage System at Ground Floor Waste, FD, CD Villa 5 as Cluster 02 A6 Zone 1A Division 22 7-Jan-2018 8-Jan-2018 9:10 AM 9-Jan-2018 A Approved Closed
highlighted sections Axis 1,6 C, E Zone 1A Cluster 2 A6
Gravity Test for uPVC Pipe waste Floor Drain connection & waste
386 KHEP-ME-386 Pipe for Drainage System at Ground Floor Waste, FD, CD Villa 4 as Cluster 02 A6 Zone 1A Division 22 7-Jan-2018 8-Jan-2018 9:20 AM 9-Jan-2018 A Approved Closed
highlighted sections Axis 1,6 E, G Zone 1A Cluster 2 A6
Gravity Test for uPVC Pipe waste Floor Drain connection & waste
387 KHEP-ME-387 Pipe for Drainage System at Ground Floor Waste, FD, CD Villa 3 as Cluster 02 A6 Zone 1A Division 22 7-Jan-2018 8-Jan-2018 9:30 AM 9-Jan-2018 A Approved Closed
highlighted sections Axis 1,6 G, J Zone 1A Cluster 2 A6
Inspection for the belcony drainage risers including gully traps UPVC
391 KHEP-ME-391
installed unside the building as highlighted Zone 4B Cluster 68 B2
Cluster 68 B2 Zone 4B Division 22 8-Jan-2018 9-Jan-2018 9:40 AM 11-Jan-2018 E Rejected Closed
Inspection for Leak test for Storm Drainage GRP Pipes And
400 KHEP-ME-400 Manholes Ø 500mm Zone 1B Line 15 Main Line:From MH-47-L15~ Line 15 Zone 1B Division 33 18-Jan-2018 20-Jan-2018 11:00 AM 21-Jan-2018 A Approved Closed
MH-48-L15 Main Line:From MH-48-L15~ MH-49-L15
Inspection for Leak test for Storm Drainage GRP Pipes And
Manholes Ø 400mm Zone 1B Line 13 Main Line:From MH-I39-L13~
401 KHEP-ME-401
MH-I40-L13 / Main Line:From MH-I40-L13~ MH-I41-L13 / Main
Line 13 Zone 1B Division 33 15-Jan-2018 16-Jan-2018 11:00 AM 20-Jan-2018 A Approved Closed
Line:From MH-I41-L13~ MH-I42-L13
Inspection for Leak test for Storm Drainage GRP Pipes And
402 KHEP-ME-402 Manholes Ø 400mm Zone 1B Line 11 Main Line:From MH-I33-L11~ Line 11 Zone 1B Division 33 15-Jan-2018 16-Jan-2018 11:00 AM 20-Jan-2018 A Approved Closed
MH-I34-L11
Insoection for Leak test for Sanitary Sewer Manholes at Zone 1B Line
403 KHEP-ME-403
1 MH-5-L01
Line 1 Zone 1B Division 33 11-Jan-2018 13-Jan-2018 10:15 AM 14-Jan-2018 A Approved Closed
Inspection for Leak test for Sanitary Sewer Manholes at Zone 1B Line
414.1 KHEP-ME-414-01
5 MH-1-L05 MH-2-L05
Line 5 Zone 1B Division 33 23-Jan-2018 24-Jan-2018 10:15 AM 25-Jan-2018 A Approved Closed
Inspection for Leak test for sanitary sewer short pices at Zone 2B
423.1 KHEP-ME-423-01
Line 12 MH-1-L12 MH-2-L12 MH-3-L12
Line 12 Zone 2B Division 33 24-Jan-2018 25-Jan-2018 10:15 AM 27-Jan-2018 A Approved Closed
Inspection for Leak test for sanitary sewer short pices at Zone 2B
424 KHEP-ME-424
Line 9 MH-2-L09 MH-3-L09
Line 9 Zone 2B Division 33 16-Jan-2018 17-Jan-2018 10:15 AM 20-Jan-2018 A Approved Closed
Installation Fire Fighting System Piping only as per attached Highlited Approved w/
425 KHEP-ME-425
Drawing Cluster 69 B2 Zone 4B
Cluster 69 B2 Zone 4B Division 21 16-Jan-2018 17-Jan-2018 10:00 AM 20-Jan-2018 B comments
Closed
Hydrostatic Pressure testing of fire fighting system Piping Only as per Approved w/
426 KHEP-ME-426
attached highlited drawings Cluster 69 Zone 4B
Cluster 69 B2 Zone 4B Division 21 16-Jan-2018 17-Jan-2018 10:00 AM 20-Jan-2018 B comments
Closed
Installation of water closet concealed cistern wall hung type typical Cluster 69 B2
428 KHEP-ME-428
at ground floor & first floor Cluster 69 B2 Right Vill Zone 4B Right Villa
Zone 4B Division 22 17-Jan-2018 18-Jan-2018 10:00 AM 21-Jan-2018 E Rejected Closed
Installation of underground soil & waste drainage piping as per Cluster 11 B2 Approved w/
433 KHEP-ME-433
highlighted Zone 1B Cluster 11 B2 left & right left & right
Zone 1B Division 22 17-Jan-2018 18-Jan-2018 9:30 AM 20-Jan-2018 B comments
Closed
Inspection for Leak test for Storm Drainage GRP Pipes And
435 KHEP-ME-435 Manholes Ø 400mm Zone 1B Line 10 Main Line:From MH-I31- Line 10 Zone 1B Division 33 18-Jan-2018 20-Jan-2018 11:00 AM 21-Jan-2018 A Approved Closed
L10~MH-32-L10
Installation of storm drainage GRP pipes & short piece embedded
436 KHEP-ME-436 pice 500mm Zone 3B Line 20 Mh-68-L20 to MH-69-L20 MH-69-L20 Line 20 Zone 3B Division 33 18-Jan-2018 20-Jan-2018 11:30 AM 21-Jan-2018 A Approved Closed
to MH-70-L20
Installation of sanitary sewer upvc pipes & short pices 200mm Class
437 KHEP-ME-437
4 Zone 1B Line 2 MH-6-L02 MH-5-L02
Line 2 Zone 1B Division 33 18-Jan-2018 20-Jan-2018 11:00 AM 21-Jan-2018 A Approved Closed
Installation of underground drainage system soil & waste UPVC pipe Cluster 11 B2
441 KHEP-ME-441
line below ground floor as per highlighted Zone 1B Cluster 11 B2 V2 V2
Zone 1B Division 22 20-Jan-2018 21-Jan-2018 8:30 AM 23-Jan-2018 A Approved Closed
Inspection for leak test for sanitary sewer manholes at Zone 1B Line Approved w/
444 KHEP-ME-444
2 MH-5-A-L02 MH-4-L02 & MH-3-L02
Line 2 Zone 1B Division 33 20-Jan-2018 21-Jan-2018 10:15 AM 22-Jan-2018 B comments
Closed
Inspection for leak test for sanitary sewer short piece at Zone 2B
445 KHEP-ME-445
Line 9 MH-1-L09 MH-2-L09
Line 9 Zone 2B Division 33 20-Jan-2018 21-Jan-2018 10:15 AM 22-Jan-2018 A Approved Closed
Installtion of sanitary sewer uPVC from main line to manhole short Approved w/
449 KHEP-ME-449
piece & backdrop 200mm & 160mm Class 4 Line 2 Zone 2B & 3B
Line 2 Zone 2B & 3B Division 33 21-Jan-2018 22-Jan-2018 11:00 AM 23-Jan-2018 B comments
Closed
Inspection for leak test for storm drainage GRP pipes & manholes
453 KHEP-ME-453
500mm MH-51-L15 MH-52-L15 Zone 1B Line 15
Line 15 Zone 1B Division 33 23-Jan-2018 24-Jan-2018 11:00 AM 27-Jan-2018 A Approved Closed
Installation of kitchen sink DCW & DHW water supply & dishwasher
Cluster 15 B2
459 KHEP-ME-459 DCW water supply PPR imbedded on wall as highlighted Zone 1B
Right Villa
Zone 1B Division 22 23-Jan-2018 24-Jan-2018 10:30 AM 25-Jan-2018 A Approved Closed
Cluster 15 B2 Right Villa
Gravity leak test for the installation of balcony drainage risers
460 KHEP-ME-460 including gully traps uPVC installed inside the building as highlighted Cluster 13 B2 Zone 1B Division 22 23-Jan-2018 24-Jan-2018 10:00 AM 27-Jan-2018 A Approved Closed
Zone 1B Cluster 13 B2
Installation of sanitary sewer upvc pipes & short pices 200mm Class
469 KHEP-ME-469
4 Zone 1B Line 2 MH-7-L02 MH-6-L02
Line 2 Zone 1B Division 33 24-Jan-2018 25-Jan-2018 11:00 AM 27-Jan-2018 A Approved Closed
Installation of sanitary sewer uPVC pipes & short piece 200mm Class
472 KHEP-ME-472
4 Zone 1B Line 2 MH-2-L02 MH-2-A-L02 MH-2-A-L02 MH-1-L02
Line 2 Zone 1B Division 33 25-Jan-2018 27-Jan-2018 11:00 AM 28-Jan-2018 A Approved Closed
Inspection for leak test for storm drainage GRP pipes & manholes
473 KHEP-ME-473
400mm MH-I53-L16 MH-54-L15 Line 16 Zone 1B
Line 16 Zone 1B Division 33 25-Jan-2018 27-Jan-2018 11:00 AM 27-Jan-2018 E Rejected Closed
Inspection for leak test for storm drainage GRP pipes & manholes
473.1 KHEP-ME-473-01
400mm MH-I53-L16 MH-54-L15 Line 16 Zone 1B
Line 16 Zone 1B Division 33 28-Jan-2018 29-Jan-2018 11:00 AM 30-Jan-2018 A Approved Closed
Inspection for leak test for sanitary sewer manholes at Zone 1B Line
474 KHEP-ME-474
3,32 MH-1-A-L03 MH-1-L32
Line 3,32 Zone 1B Division 33 25-Jan-2018 27-Jan-2018 10:15 AM 28-Jan-2018 E Rejected Closed
Inspection for leak test for sanitary sewer manholes at Zone 1B Line
474.1 KHEP-ME-474-01
3,32 MH-1-A-L03 MH-1-L32
Line 3,32 Zone 1B Division 33 29-Jan-2018 30-Jan-2018 10:15 AM 31-Jan-2018 A Approved Closed
Inspection for the installation of floor drains & trench drain including
475 KHEP-ME-475 branch pipings imbedded on slab on grade ar ground floor as Cluster 14 B2 Zone 1B Division 22 25-Jan-2018 27-Jan-2018 10:00 AM 27-Jan-2018 E Rejected Closed
highlighted Zone 1B Cluster 14 B2
Inspection for the installation of floor drains & trench drain including
475.1 KHEP-ME-475-01 branch pipings imbedded on slab on grade at ground floor as Cluster 14 B2 Zone 1B Division 22 28-Jan-2018 29-Jan-2018 10:00 AM 30-Jan-2018 A Approved Closed
highlighted Zone 1B Cluster 14 B2
Inspection for the installation of balcony drainage risers uPVC for
476 KHEP-ME-476 first floor slab doffit to ground floor installed inside building as Cluster 4 A6 Zone 1A Division 22 25-Jan-2018 27-Jan-2018 10:30 AM 28-Jan-2018 E Rejected Closed
highlighted Zone 1A Cluster 4 A6
Inspection for the installation of balcony drainage risers uPVC for
Approved w/
476.1 KHEP-ME-476-01 first floor slab to ground floor installed inside the building as Cluster 4 A6 Zone 1B Division 22 29-Jan-2018 30-Jan-2018 9:00 AM 31-Jan-2018 B comments
Closed
highlighted Zone 1A Cluster 4 A6
Installation of vertical pipe sleeves at first floor structural slab for the
penetration of drainage water supply vent & locations of mechanical Cluster 23 Division 22 & Approved w/
492 KHEP-ME-492
openings & pipe sleeves at stair landing between ground floor & first BC4
Zone 1B
23
29-Jan-2018 30-Jan-2018 10:30 AM 30-Jan-2018 B comments
Closed
floor Cluster 23 BC4 Zone 1B
Inspection for leak test for sanitary sewer for pipe short piece at
495 KHEP-ME-495
Zone 1B Line 2 MH-7-L02 MH MH-6-L02 MH-6-L02 MH-5-L02
Line 2 Zone 1B Division 33 30-Jan-2018 31-Jan-2018 10:15 AM 31-Jan-2018 E Rejected Closed
Inspection for leak test for sanitary sewer for pipe short piece at
495.1 KHEP-ME-495-01
Zone 1B Line 2 MH-7-L02 MH MH-6-L02 MH-6-L02 MH-5-L02
Line 2 Zone 1B Division 33 1-Feb-2018 3-Feb-2018 10:15 AM 1-Feb-2018 A Approved Closed
Inspection for leak test for sanitary sewer manhole at Zone 1B Line 2
496 KHEP-ME-496
MH-6-L02 MH-5-L02
Line 2 Zone 1B Division 33 30-Jan-2018 31-Jan-2018 10:15 AM 31-Jan-2018 E Rejected Closed
Inspection for leak test for sanitary sewer manhole at Zone 1B Line 2
496.1 KHEP-ME-496-01
MH-6-L02 MH-5-L02
Line 2 Zone 1B Division 33 1-Feb-2018 3-Feb-2018 10:15 AM 1-Feb-2018 A Approved Closed
Installation of back drop fro sanitary sewer uPVC pipes 160mm Class
497 KHEP-ME-497
4 Zone 1B Line 2 MH-2-L02 MH-2-A-L02 MH-1-L02
Line 2 Zone 1B Division 33 30-Jan-2018 31-Jan-2018 10:00 AM 31-Jan-2018 E Rejected Closed
Installation of back drop fro sanitary sewer uPVC pipes 160mm Class
497.1 KHEP-ME-497-01
4 Zone 1B Line 2 MH-2-L02 MH-2-A-L02 MH-1-L02
Line 2 Zone 1B Division 33 1-Feb-2018 3-Feb-2018 10:00 AM 1-Feb-2018 A Approved Closed
Inspection for leak test for sanitary sewer back drop at Zone 1B Line
498 KHEP-ME-0498
2 MH-1-L02 MH-2-L01 MH-2-A-L02
Line 2 Zone 1B Division 33 30-Jan-2018 31-Jan-2018 10:30 AM 31-Jan-2018 E Rejected Closed
Inspection for leak test for sanitary sewer back drop at Zone 1B Line
498.1 KHEP-ME-0498-01
2 MH-1-L02 MH-2-L01 MH-2-A-L02
Line 2 Zone 1B Division 33 1-Feb-2018 3-Feb-2018 10:30 AM 1-Feb-2018 A Approved Closed
Gravity leak test of back drop sanitary sewer uPVC 200mm Class 4
498.2 KHEP-ME-0498-02
Zone 1B Line 2 at MH-1-L02 MH-1-A-L02 as highlighted
Line 2 Zone 1B Division 33 3-Feb-2018 4-Feb-2018 9:00 AM 5-Feb-2018 E Rejected Closed
Inspection for the installation of floor drains & trench drain including
Approved w/
0499 KHEP-ME-0499 branch pipings imbedded on slab on grade at ground floor as Cluster 13 B2 Zone 1B Division 22 31-Jan-2018 1-Feb-2018 9:20 AM 1-Feb-2018 B comments
Closed
highlighted Zone 1B Cluster 13 B2
Installation of embedded raiser uPVC pipe on the wall & above
ceiling connections FD for drainage system from first bathroom 2 to Cluster 15 B2 Approved w/
0500 KHEP-ME-0500
ground floor flex room soil west vent as highlighted Cluster 15 B2 V1&V2
Zone 1B Division 22 31-Jan-2018 1-Feb-2018 10:00 AM 1-Feb-2018 B comments
Closed
V1&V2 Zone 1B
Inspection of the installation of floor drains including branch pipings
Cluster 15 B2 Approved w/
0501 KHEP-ME-0501 imbedded on slab on grade at ground floor flex room as highlighted
V1&V2
Zone 1B Division 22 31-Jan-2018 1-Feb-2018 9:20 AM 1-Feb-2018 B comments
Closed
Cluster 15 B2 V1&V2 Zone 1B
Inspection of the installation of floor drains including branch pipings
Cluster 15 B2
0502 KHEP-ME-0502 imbedded on slab on grade at ground floor maids room as
V1&V2
Zone 1B Division 22 31-Jan-2018 1-Feb-2018 9:40 AM 1-Feb-2018 E Rejected Closed
highlighted Cluster 15 B2 V1&V2 Zone 1B
Inspection of the installation of floor drains including branch pipings
Cluster 15 B2
0503 KHEP-ME-0503 imbedded on slab on grade at ground floor powder room as
V1&V2
Zone 1B Division 22 31-Jan-2018 1-Feb-2018 9:40 AM 1-Feb-2018 E Rejected Closed
highlighted Cluster 15 B2 V1&V2 Zone 1B
Inspection of the installation of floor drains including branch pipings
Cluster 15 B2
0504 KHEP-ME-0504 imbedded on slab on grade at ground floor loundry as highlighted
V1&V2
Zone 1B Division 22 31-Jan-2018 1-Feb-2018 9:45 AM 1-Feb-2018 A Approved Closed
Cluster 15 B2 V1&V2 Zone 1B
Inspection for leak test for sanitary sewer for pipe short piece at
0505 KHEP-ME-0505
Zone 1B Line 31 MH-1-A-L31 MH-9-L02
Line 31 Zone 1B Division 33 31-Jan-2018 1-Feb-2018 10:15 AM 1-Feb-2018 A Approved Closed
Inspection for the installation of floor drain & tench drain including
0512 KHEP-ME-0512 branch piping imbedded on slab on grade at ground floor as per Cluster 5 Zone 1B Division 22 3-Feb-2018 4-Feb-2018 10:00 AM 5-Feb-2018 E Rejected Closed
highlighted Cluster 5 Zone 1B
Inspection for the installation of floor drain & tench drain including
0512.1 KHEP-ME-0512-01 branch piping imbedded on slab on grade at ground floor as per Cluster 5 Zone 1B Division 22 5-Feb-2018 6-Feb-2018 10:00 AM 6-Feb-2018 A Approved Closed
highlighted Cluster 5 Zone 1B
Inspection of gravity test for sanitary sewer uPVC pipes 200mm Class
0514 KHEP-ME-0514 4 & manholes with short piecs at Zone 2B & 3B Line 1 MH-9-L01 MH- Line 1 Zone 2B & 3B Division 33 3-Feb-2018 4-Feb-2018 9:00 AM 5-Feb-2018 E Rejected Closed
15-L01
Inspection of gravity test for sanitary sewer uPVC pipes 200mm Class
0514.1 KHEP-ME-0514-01 4 & manholes with short piecs at Zone 2B & 3B Line 1 MH-9-L01 MH- Line 1 Zone 2B & 3B Division 33 6-Feb-2018 7-Feb-2018 9:00 AM 10-Feb-2018 A Approved Closed
15-L01
Inspection of gravity test for storm pipe & manholes with short piecs
0515 KHEP-ME-0515 at RD01 Line 8 MH-27-L07 MH-21-L08 & Alley04 MH-I25-L09 to MH- Line 8 RD01, RD05 Division 33 3-Feb-2018 4-Feb-2018 9:30 AM 5-Feb-2018 E Rejected Closed
26-L08 & RD05 MH-27-L07 MH-20-L07
Inspection for installation of underground soil & waste drainage Cluster 9 BC4
0516 KHEP-ME-0516
uPVC piping as per highlighted Cluster 9 BC4 V4 Zone 1B V4
Zone 1B Division 33 3-Feb-2018 4-Feb-2018 10:20 AM 5-Feb-2018 E Rejected Closed
Inspection for installation of underground soil & waste drainage Cluster 9 BC4
0516.1 KHEP-ME-0516-01
uPVC piping as per highlighted Cluster 9 BC4 V4 Zone 1B V4
Zone 1B Division 33 6-Feb-2018 7-Feb-2018 10:00 AM 7-Feb-2018 A Approved Closed
Inspection of installation of gully traps for balcony drain at first floor Cluster 50
0525 KHEP-ME-0525
as per highlighted Zone 3B Cluster 50 BC4 BC4
Zone 3B Division 22 5-Feb-2018 6-Feb-2018 10:00 AM 7-Feb-2018 A Approved Closed
Installation of vertical pipe sleeves at first floor structural slab for the
Cluster 50
0526 KHEP-ME-0526 penetration of drainage water supply vent & locations of mechanical
BC4
Zone 3B Division 22 5-Feb-2018 6-Feb-2018 10:30 AM 7-Feb-2018 A Approved Closed
openings Zone 3B Cluster 50 BC4
Inspection for the installation of floor drains & trench drain at ground Division 23 &
0527 KHEP-ME-0527
floor as highlighted Cluster 10 B2 Zone 1B
Cluster 10 B2 Zone 1B
22
6-Feb-2018 7-Feb-2018 10:00 AM 7-Feb-2018 A Approved Closed
Inspection of gravity test back drop UPVC Pipes Zone 1B Line 2 RD02 Approved w/
0528 KHEP-ME-0528
MH-2-L02 MH-2A-L02 MH-1-L02
Line 2 RD02 Zone 1B Division 33 6-Feb-2018 7-Feb-2018 10:00 AM 10-Feb-2018 B comments
Closed
Inspection of gravity test for storm main line manholes with short
0533 KHEP-ME-0533 pipecs at MH-21-L08 to MH-26-L08 MH-I25-L09 MH-26-L08 MH-26A- Line 1 Zone 1B Division 33 6-Feb-2018 7-Feb-2018 9:45 AM 10-Feb-2018 A Approved Closed
L08
Inspection of gravity test for storm main line manholes with short
0534 KHEP-ME-0534
pipecs at MH-26A-L08 to MH-27-L07 main line & short pieces Line 1
Line 1 Zone 1B Division 33 6-Feb-2018 7-Feb-2018 10:15 AM 10-Feb-2018 A Approved Closed
Inspection of gravity test for main line & short pipecs at MH-3-L02
0535 KHEP-ME-0535
MH-2-L02 MH-2A-L02 MH-1-L02 MH-4-L01 Zone 1B Line 1 RD02
Line 1 RD02 Zone 1B Division 33 6-Feb-2018 7-Feb-2018 10:00 AM 10-Feb-2018 A Approved Closed
Installation of ensuite bathroom drainage above ceiling as Cluster 15 B2 Division 23 & Approved w/
0536 KHEP-ME-0536
highlighted Cluster 15 B2 Right Villa Zone 1B Right Villa
Zone 1B
22
7-Feb-2018 8-Feb-2018 10:00 AM 10-Feb-2018 B comments
Closed
Inspection for underground drainage soil & waste piping installation Cluster 9 BC4 Division 23 &
0540 KHEP-ME-0540
as per highlighted Zone 1B Cluster 9 BC4 Villa 3 Villa 3
Zone 1B
22
7-Feb-2018 8-Feb-2018 10:30 AM 10-Feb-2018 A Approved Closed
Inspection for washbasin & condensate riser & vent riser for soil &
Cluster 15 B2 Division 23 & Approved w/
0541 KHEP-ME-0541 waste at first floor ensuite bathroom as per highlighted Zone 1B
Villa 1&2
Zone 1B
22
7-Feb-2018 8-Feb-2018 10:30 AM 10-Feb-2018 B comments
Closed
Cluster 15 B2 Villa 1&2
Inspection for underground drainage soil & waste piping installation Cluster 16 Division 23 &
0542 KHEP-ME-0542
as per highlighted Zone 1B Cluster 16 BC4 Villa 1 BC4 Villa 1
Zone 1B
22
7-Feb-2018 8-Feb-2018 10:30 AM 10-Feb-2018 A Approved Closed
Inspection for underground drainage soil & waste piping installation Cluster 16 Division 23 &
0543 KHEP-ME-0543
as per highlighted Zone 1B Cluster 16 BC4 Villa 2 BC4 Villa 2
Zone 1B
22
7-Feb-2018 8-Feb-2018 10:30 AM 10-Feb-2018 A Approved Closed
Inspection for underground uPVC soil & waste piping installation as Cluster 68 B2
0544 KHEP-ME-0544
per highlighted Zone 4B Cluster 68 B2 Villa 2 Villa 2
Zone 4B Division 22 8-Feb-2018 10-Feb-2018 10:00 AM 10-Feb-2018 A Approved Closed
Inspection for underground drainage uPVC soil & waste piping Cluster 9 BC4
0549 KHEP-ME-0549
installation as per highlighted Zone 1B Cluster 9 BC4 Villa 3 Villa 3
Zone 1B Division 22 8-Feb-2018 10-Feb-2018 10:30 AM 10-Feb-2018 A Approved Closed
Inspection for leak test of underground drainage uPVC piping Cluster 9 BC4
0550 KHEP-ME-0550 installed inside the building as per highlighted Zone 1B Cluster 9 BC4 Villa 3 & Villa Zone 1B Division 22 8-Feb-2018 10-Feb-2018 10:15 AM 10-Feb-2018 A Approved Closed
Villa 3 & Villa 4 4
Inspection of gravity test for the installation of floor drains gully traps Cluster 10 B2
0551 KHEP-ME-0551 & branches at ground floor as per highlighted Zone 1B Cluster 10 B2 Villa 1 & Villa Zone 1B Division 22 8-Feb-2018 10-Feb-2018 10:30 AM 10-Feb-2018 A Approved Closed
Villa 1 & Villa 2 2
Inspection installation of floor drains gully traps & branches at Cluster 7 B2
0552 KHEP-ME-0552 ground floor slab on grade as per highlighted Zone 1B Cluster 7 B2 Villa 1 & Villa Zone 1B Division 22 8-Feb-2018 10-Feb-2018 10:30 AM 10-Feb-2018 A Approved Closed
Villa 1 & Villa 2 2
Cluster 64 B2
Inspection for the installation gully traps for balcony drains at first
0553 KHEP-ME-0553
floor as per highlighted Zone 3B Cluster 64 B2 Vilal 1 & Villa 2
Vilal 1 & Villa Zone 3B Division 22 8-Feb-2018 10-Feb-2018 10:30 AM 10-Feb-2018 A Approved Closed
2
Inspection for underground drainage uPVC soil & waste piping Cluster 68 B2
0555 KHEP-ME-0555
installation as per highlighted Zone 4B Cluster 68 B2 Villa 1 Villa 1
Zone 4B Division 22 8-Feb-2018 10-Feb-2018 10:00 AM 10-Feb-2018 A Approved Closed
Installation of ensuite bathroom drainage above ceiling as Cluster 15 B2 Division 22 & Approved w/
0556 KHEP-ME-0556
highlighted Cluster 15 B2 left Villa Zone 1B left Villa
Zone 1B
23
8-Feb-2018 10-Feb-2018 10:20 AM 10-Feb-2018 B comments
Closed
Inspection for installation of floor drains gully traps & branches as Cluster 01 A6
0577 KHEP-ME-0577
per highlighted Zone 1A Cluster 1 A6 Villa 5, Villa 6 Villa 5, Villa 6
Zone 1A Division 22 12-Feb-2018 13-Feb-2018 10:40 AM 13-Feb-2018 A Approved Closed
Inspection for installation of floor drains gully traps & branches as Cluster 02 A6
0578 KHEP-ME-0578
per highlighted Zone 1A Cluster 2 A6 Villa 1, Villa 2 Villa 1, Villa 2
Zone 1A Division 22 12-Feb-2018 13-Feb-2018 10:50 AM 13-Feb-2018 A Approved Closed
Inspection for installation of gully traps for balcony drain at first floor Cluster 22
0579 KHEP-ME-0579
as per highlighted Zone 1B Cluster 22 BC4 BC4
Zone 1B Division 22 13-Feb-2018 14-Feb-2018 9:50 AM 17-Feb-2018 A Approved Closed
Inspection for installation of DCW, DHW & RHW supply line PPR
piping above ceiling & embedded on wall at first floor for master & Cluster 15 B2
0580 KHEP-ME-0580
bedroom 1 bathroom excluding valve & water hammer arrestore as Villa 2
Zone 1B Division 22 13-Feb-2018 14-Feb-2018 10:30 AM 17-Feb-2018 A Approved Closed
per highlighted Zone 1B Cluster 15 B2 Villa 2
Inspection for installation of DCW, DHW & RHW supply line PPR
piping above ceiling at first floor for ensuite bathroom excluding Cluster 15
0581 KHEP-ME-0581
valve & water hammer arrestore as per highlighted Zone 1B Cluster Villa 2
Zone 1B Division 22 13-Feb-2018 14-Feb-2018 10:10 AM 17-Feb-2018 A Approved Closed
15 Villa 2
Inspection of the leak test of sewage line beck drop uPVC 160mm
0585 KHEP-ME-0585
MH-11-L02 2NOS MH-12-L02 2NOS MH-13-L02 Zone 2B Line 2
Line 2 Zone 2B Division 33 15-Feb-2018 17-Feb-2018 9:00 AM 18-Feb-2018 A Approved Closed
Inspection for the gravity leak test for the installation of balcony
Approved w/
0586 KHEP-ME-0586 drainage risers uPVC including gully trap installed as highlighted Cluster 07 B2 Zone 1B Division 22 14-Feb-2018 15-Feb-2018 9:00 AM 17-Feb-2018 B comments
Closed
Zone 1B Cluster 07 B2
Inspection for installation of gully traps for balcony drain at first floor
0589 KHEP-ME-0589
as per highlighted Zone 4A Cluster 65 A6
Cluster 65 A6 Zone 4A Division 22 14-Feb-2018 15-Feb-2018 9:15 AM 17-Feb-2018 A Approved Closed
Inspection for the gravity leak test for the installation of balcony
0592 KHEP-ME-0592 drainage risers uPVC including gully trap installed as highlighted Cluster 19 B2 Zone 1B Division 22 14-Feb-2018 15-Feb-2018 9:40 AM 17-Feb-2018 A Approved Closed
Zone 1B Cluster 19 B2
Inspection for the gravity leak test for the installation of balcony
Approved w/
0593 KHEP-ME-0593 drainage risers uPVC including gully trap installed as highlighted Cluster 05 B2 Zone 1B Division 22 14-Feb-2018 15-Feb-2018 9:45 AM 17-Feb-2018 B comments
Closed
Zone 1B Cluster 05 B2
Inspection for installation of DCW, DHW & RHW supply line piping
above ceiling at first floor for ensuite bathroom excluding valve & Cluster 15 B2
0594 KHEP-ME-0594
water hammer arrestore as per highlighted Zone 1B Cluster 15 B2 Villa 1
Zone 1B Division 22 14-Feb-2018 15-Feb-2018 10:00 AM 17-Feb-2018 E Rejected Closed
Villa 1
Inspection for the leak test of floor drains gully traps & branches at
Cluster 02 A6
0595 KHEP-ME-0595 ground floor slab on grade as per highlighted Zone 1B Cluster 02 A6
Villa 3
Zone 1B Division 22 14-Feb-2018 15-Feb-2018 10:00 AM 18-Feb-2018 A Approved Closed
Villa 3
Inspection for the leak test of floor drains gully traps & branches at
Cluster 02 A6
0596 KHEP-ME-0596 ground floor slab on grade as per highlighted Zone 1B Cluster 02 A6
Villa 4
Zone 1B Division 22 14-Feb-2018 15-Feb-2018 10:05 AM 18-Feb-2018 A Approved Closed
Villa 4
Inspection for the leak test of floor drains gully traps & branches at
Cluster 02 A6
0597 KHEP-ME-0597 ground floor slab on grade as per highlighted Zone 1B Cluster 02 A6
Villa 5
Zone 1B Division 22 14-Feb-2018 15-Feb-2018 10:15 AM 18-Feb-2018 A Approved Closed
Villa 5
Inspection for the leak test of floor drains gully traps & branches at
Cluster 02 A6
0598 KHEP-ME-0598 ground floor slab on grade as per highlighted Zone 1B Cluster 02 A6
Villa 6
Zone 1B Division 22 14-Feb-2018 15-Feb-2018 10:25 AM 18-Feb-2018 A Approved Closed
Villa 6
Inspection for the leak test of floor drains gully traps & branches at
Cluster 13 B2
0599 KHEP-ME-0599 ground floor slab on grade as per highlighted Zone 1B Cluster 13 B2
Villa 1
Zone 1B Division 22 14-Feb-2018 15-Feb-2018 10:25 AM 18-Feb-2018 A Approved Closed
Villa 1
Inspection for the leak test of floor drains gully traps & branches at
Cluster 13 B2
0600 KHEP-ME-0600 ground floor slab on grade as per highlighted Zone 1B Cluster 13 B2
Villa 2
Zone 1B Division 22 14-Feb-2018 15-Feb-2018 10:20 AM 18-Feb-2018 A Approved Closed
Villa 2
Inspection for the leak test of floor drains gully traps & branches at
Cluster 14 B2
0601 KHEP-ME-0601 ground floor slab on grade as per highlighted Zone 1B Cluster 14 B2
Villa 2
Zone 1B Division 22 14-Feb-2018 15-Feb-2018 10:20 AM 18-Feb-2018 A Approved Closed
Villa 2
Inspection for the leak test of floor drains gully traps & branches at
Cluster 14 B2
0602 KHEP-ME-0602 ground floor slab on grade as per highlighted Zone 1B Cluster 14 B2
Villa 1
Zone 1B Division 22 14-Feb-2018 15-Feb-2018 10:25 AM 18-Feb-2018 A Approved Closed
Villa 1
Inspection of the gravity test of storm line main line & short pieces
0603 KHEP-ME-0603
MH-50-L15 MH-51-L15 MH-52-L15 MH-54-L15 Zone 1B Road 01
Road 01 Zone 1B Division 33 15-Feb-2018 17-Feb-2018 10:00 AM 18-Feb-2018 A Approved Closed
Inspection for the installation of floor drains gully traps & branches
Cluster 11 B2
0613 KHEP-ME-0613 at ground floor slab on grade as per highlighted Zone 1B Cluster 11
Villa 01
Zone 1B Division 22 18-Feb-2018 19-Feb-2018 9:50 AM 19-Feb-2018 A Approved Closed
B2 Villa 01
Inspection for the installation of floor drains gully traps & branches
Cluster 11 B2
0614 KHEP-ME-0614 at ground floor slab on grade as per highlighted Zone 1B Cluster 11
Villa 02
Zone 1B Division 22 18-Feb-2018 19-Feb-2018 9:50 AM 19-Feb-2018 A Approved Closed
B2 Villa 02
Inspection for the leak test of floor drain gully traps & branches at
Cluster 11 B2
0615 KHEP-ME-0615 ground floor slab on grade as per highlighted Zone 1B Cluster 11 B2
Villa 01
Zone 1B Division 22 18-Feb-2018 19-Feb-2018 10:40 AM 20-Feb-2018 A Approved Closed
Villa 01
Inspection for the leak test of floor drain gully traps & branches at
Cluster 11 B2
0616 KHEP-ME-0616 ground floor slab on grade as per highlighted Zone 1B Cluster 11 B2
Villa 02
Zone 1B Division 22 18-Feb-2018 19-Feb-2018 10:40 AM 20-Feb-2018 A Approved Closed
Villa 02
Inspection for the installation of ground floor drains gully traps &
Cluster 01 A6
0617 KHEP-ME-0617 connected waste drainage branch piping as per highlighted Zone 1A
Villa 01
Zone 1A Division 22 18-Feb-2018 19-Feb-2018 10:50 AM 19-Feb-2018 A Approved Closed
Cluster 01 A6 Villa 01
Inspection for the gravity leak test for the installation of ground floor
Cluster 02 A6
0619 KHEP-ME-0619 drains gully traps & connected waste drainage branch piping as per
Villa 01
Zone 1A Division 22 18-Feb-2018 19-Feb-2018 9:50 AM 20-Feb-2018 A Approved Closed
highlighted Zone 1A Cluster 02 A6 Villa 01
Inspection for the gravity leak test for the installation of ground floor
Cluster 02 A6
0620 KHEP-ME-0620 drains gully traps & connected waste drainage branch piping as per
Villa 02
Zone 1A Division 22 18-Feb-2018 19-Feb-2018 10:50 AM 20-Feb-2018 A Approved Closed
highlighted Zone 1A Cluster 02 A6 Villa 02
Inspection of the gravity leak test for storm line short pieces MH-49-
0621 KHEP-ME-0621
L15 MH-50-L15 Zone 1B Line 15
Line 15 Zone 1B Division 33 19-Feb-2018 20-Feb-2018 10:10 AM 21-Feb-2018 A Approved Closed
Inspection of the gravity leak test for storm line main line & short
0622 KHEP-ME-0622
pieces MH-47-L15 MH-46-L15 Zone 1B Line 15
Line 15 Zone 1B Division 33 19-Feb-2018 20-Feb-2018 10:00 AM 21-Feb-2018 A Approved Closed
Inspection of the gravity leak test for storm manhole MH-49-L15 Line
0623 KHEP-ME-0623
15 Zone 1B
Line 15 Zone 1B Division 33 19-Feb-2018 20-Feb-2018 10:00 AM 21-Feb-2018 A Approved Closed
Inspection of the gravity leak test for storm manhole MH-46-L15 Line
0624 KHEP-ME-0624
15 Zone 1B
Line 15 Zone 1B Division 33 19-Feb-2018 20-Feb-2018 10:30 AM 21-Feb-2018 A Approved Closed
inspection for the Leak Test of installation of uunderround drainage Cluster 09 Approved w/
0664 KHEP-ME-0664
UPVC soil & waste piping inside the building as per highlighted BC 4
Zone 1B Division 22 22-Feb-2018 24-Feb-2018 11:10 AM 24-Feb-2018 B comments
Closed
Inspection of installation of gully traps for balcony drain at first floor Cluster 42
0667 KHEP-ME-0667
as per highlighted Zone 2B Cluster 42 BC4 BC4
Zone 2B Division 22 25-Feb-2018 26-Feb-2018 10:00 AM 27-Feb-2018 A Approved Closed
Inspection for the gravity leak test of installation of underground soil Cluster 21
0669 KHEP-ME-0669 & waste drainage piping at ground floor inside the building as per BC4 Villa 01, Zone 1B Division 22 25-Feb-2018 26-Feb-2018 11:10 AM 27-Feb-2018 A Approved Closed
highlighted Zone 1B Cluster 21 BC4 Villa 01, 02 02
0673 KHEP-ME-0673 Inspection of installation of sewage line back drop MH-1-L11 Line 01 Line 01 NA Division 33 25-Feb-2018 26-Feb-2018 9:05 AM RECALLED
0681 KHEP-ME-0681 Inspection of installation of sewage line backdrop MH-1A-L09 Line 01 Line 01 NA Division 33 26-Feb-2018 27-Feb-2018 10:40 AM 28-Feb-2018 A Approved Closed
0682 KHEP-ME-0682 Inspection of leak test of sewage line backdrop MH-1A-L09 Line 01 Line 01 NA Division 33 26-Feb-2018 27-Feb-2018 10:50 AM 28-Feb-2018 A Approved Closed
Inspection for the leak test of storm line main line & short piece MH-
0683 KHEP-ME-0683
I7-L03 MH-I8-L01 Line 01 Zone 1B
Line 01 Zone 1B Division 33 26-Feb-2018 27-Feb-2018 11:00 AM 28-Feb-2018 A Approved Closed
Inspection for the gravity leak test of storm manhole MH-I7-L03 Line
0684 KHEP-ME-0684
01 Zone 1B
Line 01 Zone 1B Division 33 26-Feb-2018 27-Feb-2018 11:10 AM 28-Feb-2018 A Approved Closed
Inspection for the installation of vertical pipe sleeves for penetration
of drainage & water supply piping & mechanical openingss & vent at Cluster 42
0685 KHEP-ME-0685
first floor slab & pipe sleeve at stair landing between ground & first BC4
Zone 2B Division 22 26-Feb-2018 27-Feb-2018 10:00 AM 27-Feb-2018 A Approved Closed
floor Zone 2B Cluster 42 BC4
Inspection for the leak test of installation of underround drainage
Cluster 03 A6
0686 KHEP-ME-0686 UPVC soil & waste piping at ground floor as per highlighted Zone 1A Zone 1A Division 22 27-Feb-2018 28-Feb-2018 10:10 AM Open
Villa 02
Cluster 03 A6 Villa 02
Inspection for the leak test of installation of underround drainage
Cluster 03 A6
0687 KHEP-ME-0687 UPVC soil & waste piping at ground floor as per highlighted Zone 1A Zone 1A Division 22 27-Feb-2018 28-Feb-2018 10:00 AM Open
Villa 01
Cluster 03 A6 Villa 01
Inspection for the leak test of installation of underround drainage
Cluster 06
0688 KHEP-ME-0688 UPVC soil & waste piping at ground floor as per highlighted Zone 1B Zone 1B Division 22 27-Feb-2018 28-Feb-2018 10:20 AM Open
BC4 Villa 03
Cluster 06 BC4 Villa 03
Inspection for the leak test of installation of underround drainage
Cluster 06
0689 KHEP-ME-0689 UPVC soil & waste piping at ground floor as per highlighted Zone 1B Zone 1B Division 22 27-Feb-2018 28-Feb-2018 10:30 AM Open
BC4 Villa 04
Cluster 06 BC4 Villa 04
Inspection for the leak test of installation of underround drainage
Cluster 21
0690 KHEP-ME-0690 UPVC soil & waste piping at ground floor as per highlighted Zone 1B Zone 1B Division 22 27-Feb-2018 28-Feb-2018 10:40 AM Open
BC4 Villa 03
Cluster 21 BC4 Villa 03
Inspection for the leak test of installation of underround drainage
Cluster 21
0691 KHEP-ME-0691 UPVC soil & waste piping at ground floor as per highlighted Zone 1B Zone 1B Division 22 27-Feb-2018 28-Feb-2018 10:50 AM Open
BC4 Villa 04
Cluster 21 BC4 Villa 04
Inspection for the installation of ground floor drains gully traps &
Cluster 16
0692 KHEP-ME-0692 connected waste drainage branch piping as per highlighted Zone 1B Zone 1B Division 22 27-Feb-2018 28-Feb-2018 11:00 AM Open
BC4 Villa 01
Cluster 16 BC4 Villa 01
Inspection for the installation of ground floor drains gully traps &
Cluster 16
0693 KHEP-ME-0693 connected waste drainage branch piping as per highlighted Zone 1B Zone 1B Division 22 27-Feb-2018 28-Feb-2018 11:10 AM Open
BC4 Villa 02
Cluster 16 BC4 Villa 02
Inspection for the installation of ground floor drains gully traps &
Cluster 16
0696 KHEP-ME-0696 connected waste drainage branch piping as per highlighted Zone 1B Zone 1B Division 22 27-Feb-2018 28-Feb-2018 2:00 PM Open
BC4 Villa 03
Cluster 16 BC4 Villa 03
Inspection for the installation of ground floor drains gully traps &
Cluster 16
0697 KHEP-ME-0697 connected waste drainage branch piping as per highlighted Zone 1B Zone 1B Division 22 27-Feb-2018 28-Feb-2018 2:10 PM Open
BC4 Villa 04
Cluster 16 BC4 Villa 04
Inspection for the installation of ground floor drains gully traps &
Cluster 20 B2
0698 KHEP-ME-0698 Connected waste drainage branch piping as per highlighted Zone 1B Zone 1B Division 22 28-Feb-2018 1-Mar-2018 10:00 AM Open
Villa 01
Cluster 20 B2 Villa 01
Inspection for the installation of ground floor drains gully traps &
Cluster 20 B2
0699 KHEP-ME-0699 Connected waste drainage branch piping as per highlighted Zone 1B Zone 1B Division 22 28-Feb-2018 1-Mar-2018 10:10 AM Open
Villa 02
Cluster 20 B2 Villa 02
Inspection for the leak test of installation of underround UPVC soil &
Cluster 04 A6
0700 KHEP-ME-0700 waste drainage piping at ground floor as per highlighted Zone 1A Zone 1A Division 22 28-Feb-2018 1-Mar-2018 10:20 AM Open
Villa 03
Cluster 04 A6 Villa 03
Inspection for the leak test of installation of underround UPVC soil &
Cluster 04 A6
0701 KHEP-ME-0701 waste drainage piping at ground floor as per highlighted Zone 1A Zone 1A Division 22 28-Feb-2018 1-Mar-2018 10:30 AM Open
Villa 04
Cluster 04 A6 Villa 04
Inspection for the leak test of installation of underround UPVC soil &
Cluster 04 A6
0702 KHEP-ME-0702 waste drainage piping at ground floor as per highlighted Zone 1A Zone 1A Division 22 28-Feb-2018 1-Mar-2018 10:40 AM Open
Villa 05
Cluster 04 A6 Villa 05
Inspection for the leak test of installation of underround UPVC soil &
Cluster 04 A6
0703 KHEP-ME-0703 waste drainage piping at ground floor as per highlighted Zone 1A Zone 1A Division 22 28-Feb-2018 1-Mar-2018 10:50 AM Open
Villa 06
Cluster 04 A6 Villa 06
Inspection for the leak test of the installation of ground floor drains
Cluster 16
0704 KHEP-ME-0704 gully traps & connected waste drainage branch piping as per Zone 1B Division 22 28-Feb-2018 1-Mar-2018 11:30 AM Open
BC4 Villa 01
highlighted Zone 1B Cluster 16 BC4 Villa 01
Inspection for the leak test of the installation of ground floor drains
Cluster 16
0705 KHEP-ME-0705 gully traps & connected waste drainage branch piping as per Zone 1B Division 22 28-Feb-2018 1-Mar-2018 11:40 AM Open
BC4 Villa 02
highlighted Zone 1B Cluster 16 BC4 Villa 02
Inspection for the leak test of the installation of ground floor drains
Cluster 16
0706 KHEP-ME-0706 gully traps & connected waste drainage branch piping as per Zone 1B Division 22 28-Feb-2018 1-Mar-2018 11:45 AM Open
BC4 Villa 03
highlighted Zone 1B Cluster 16 BC4 Villa 03
Inspection for the leak test of the installation of ground floor drains
Cluster 16
0707 KHEP-ME-0707 gully traps & connected waste drainage branch piping as per Zone 1B Division 22 28-Feb-2018 1-Mar-2018 11:50 AM Open
BC4 Villa 04
highlighted Zone 1B Cluster 16 BC4 Villa 04
Installation of PVC conduit and Gl boxes for First & Roof floor
0141 KHEP-LC-0141 Mechanical Equipment Control Systme at Roof Slab of cluster 8 Cluster 8 Zone 1B Division 26 2-Dec-2017 3-Dec-2017 9:30 AM 4-Dec-2017 A Approved Closed
Zone 1B, Cluster 8
Installation of PVC conduits and galvanized steel boxes for First Floor
Approved w/
0142 KHEP-LC-0142 Fire Detection and Alarm System at Roof slab of Cluster 8 Cluster 8 Zone 1B Division 28 2-Dec-2017 3-Dec-2017 10:00 AM 5-Dec-2017 B comments
Closed
Zone 1B, Cluster 8
Installation of PVC conduits and galvanized steel boxes for first Floor
Approved w/
0173 KHEP-LC-0173 Fire Detection and Alarm System at Roof slab of Cluster 61 Cluster 61 Zone 3B Division 28 17-Dec-2017 18-Dec-2017 8:00 AM 21-Dec-2017 B comments
Closed
Zone 3B, Cluster 61
Installation of PVC conduit and Gl boxes for first floor & roof floor
Mechanical Equipment Control Systme at roof Slab of cluster 61 Approved w/
0174 KHEP-LC-0174
Zone 3B, Cluster
Cluster 61 Zone 3B Division 26 17-Dec-2017 18-Dec-2017 8:30 AM 19-Dec-2017 B comments
Closed
61
Installation of PVC conduit and Gl boxes for first floor
Approved w/
0175 KHEP-LC-0175 telecommunication outlet at cluster 69 Cluster 69 Zone 4B Division 26 18-Dec-2017 19-Dec-2017 8:30 AM 20-Dec-2017 B comments
Closed
Zone 4B, Cluster 69
Installation of PVC conduit and Gl boxes for first floor & roof floor
Approved w/
0176 KHEP-LC-0176 Mechanical Equipment Control Systme at roof Slab of Zone 1B, Cluster 20 Zone 1B Division 26 21-Dec-2017 23-Dec-2017 8:00 AM 25-Dec-2017 B comments
Closed
Cluster 20
Installation of PVC conduits and Galvanized steel boxes for First Floor
Approved w/
0177 KHEP-LC-0177 Fire Detection and Alarm System atRoof Slab of Cluster 20 Zone 1B, Cluster 20 Zone 1B Division 28 21-Dec-2017 23-Dec-2017 8:30 AM 25-Dec-2017 B comments
Closed
Cluster 20
Installation of PVC conduits and Galvanized steel boxes for First Floor
Approved w/
0178 KHEP-LC-0178 Fire Detection and Alarm System at Roof Slab of Cluster 3 Zone 1A, Cluster 3 Zone 1A Division 28 23-Dec-2017 24-Dec-2017 8:00 AM 25-Dec-2017 B comments
Closed
Cluster 3
Installation of PVC conduits and GI boxes for First & Roof Floor
0180 KHEP-LC-0180 Mechanical Equipment Control System at Roof Slab Of Cluster 3 Zone Cluster 3 Zone 1A Division 26 24-Dec-2017 25-Dec-2017 8:40 AM 27-Dec-2017 E Rejected Closed
1A Cluster 3
Installation of PVC conduits and GI boxes for First & Roof Floor
Approved w/
0180.1 KHEP-LC-0180-01 Mechanical Equipment Control System at Roof Slab Of Cluster 3 Zone Cluster 3 Zone 1A Division 26 27-Dec-2017 28-Dec-2017 8:30 AM 30-Dec-2017 B comments
Closed
1A
Installation of EMT conduits and GI boxes for First Thermostat at Approved w/
0181 KHEP-LC-0181
Cluster 69 Unit B Zone 4B
Cluster 69 Zone 4B Division 26 25-Dec-2017 26-Dec-2017 8:00 AM 28-Dec-2017 B comments
Closed
Installation of PVC conduits and GI boxes for Ground Floor Fire Alarm Approved w/
0184 KHEP-LC-0184
& Detection System at First Floor Slab of Cluster 34 Zone 2B
Cluster 34 Zone 2B Division 26 27-Dec-2017 28-Dec-2017 8:00 AM 30-Dec-2017 B comments
Closed
Installation of PVC conduits and galvanized steel boxes for First Floor
Fire Detection and Alarm System at Roof slab of Cluster 48 Approved w/
0185 KHEP-LC-0185
Zone 3B, Cluster
Cluster 48 Zone 3B Division 28 28-Dec-2017 30-Dec-2017 8:00 AM 1-Jan-2018 B comments
Closed
48
Installation of PVC conduits and GI boxes for First Floor & Roof Floor
Approved w/
0186 KHEP-LC-0186 Mechanical Equipment Control System at Roof Slab of Cluster 48 Cluster 48 Zone 3B Division 26 28-Dec-2017 30-Dec-2017 8:30 AM 2-Jan-2018 B comments
Closed
Zone 3B
Installation of PVC conduits & GI boxes for Ground Floor Fire Alarm
Approved w/
0191 KHEP-LC-0191 & Detection System at First Floor slab of Cluster 35 Cluster 35 Zone 2B Division 26 30-Dec-2017 31-Dec-2017 11:00 AM 1-Jan-2018 B comments
Closed
Zone 2B, Cluster 35
Installation of PVC Conduits & GI Boxes for Ground Floor Fire Alarm Approved w/
0202 KHEP-LC-0202
& Detection System at First Floor Slab of Cluster 72 Zone 4B
Cluster 72 Zone 4B Division 26 7-Jan-2018 8-Jan-2018 9:00 AM 9-Jan-2018 B comments
Closed
Installation of PVC Conduits & Galvanized Steel Boxes for First Floor
Approved w/
0203 KHEP-LC-0203 Fire Detection & Fire Alarm System at Roof Slab of Cluster 51 Zone Cluster 51 Zone 3B Division 28 7-Jan-2018 8-Jan-2018 9:30 AM 9-Jan-2018 B comments
Closed
3B
Installation of PVC conduits and GI boxes for First Floor & Roof Floor
Approved w/
0204 KHEP-LC-0204 Mechanical Equipment Control System at Roof Slab of Cluster 51 Cluster 51 Zone 3B Division 26 7-Jan-2018 8-Jan-2018 10:00 AM 9-Jan-2018 B comments
Closed
Zone 3B
Installation of EMT conduit & GI boxes for ground floor telecom
Approved w/
0205 KHEP-LC-0205 outlet at Cluster 69 Zone 4B Unit B for maid's rooms flexroom flex Cluster 69 Zone 4B Division 26 7-Jan-2018 8-Jan-2018 8:00 AM 13-Jan-2018 B comments
Closed
room & living room outlet only
Installation of PVC conduits & galvanized steel boxes for first floor Approved w/
0206 KHEP-LC-0206
fire detection & alarm system at roof slab of Cluster 27 Zone 2B
Cluster 27 Zone 2B Division 28 9-Jan-2018 10-Jan-2018 8:00 AM 13-Jan-2018 B comments
Closed
Installation of PVC conduits & GI boxes for first & roof floor
Approved w/
0207 KHEP-LC-0207 mechanical equipment control system at roof slab of Cluster 27 Zone Cluster 27 Zone 2B Division 26 9-Jan-2018 10-Jan-2018 8:30 AM 11-Jan-2018 B comments
Closed
2B
Installation of PVC conduits & GI boxes for ground floor fire alarm & Approved w/
0208 KHEP-LC-0208
detection system at first floor slab of Cluster 21 Zone 1B
Cluster 21 Zone 1B Division 26 9-Jan-2018 10-Jan-2018 9:00 AM 13-Jan-2018 B comments
Closed
Installation of PVC conduits & galvanized steel boxes for first floor Approved w/
0209 KHEP-LC-0209
fire detection & alarm system at roof slab of Cluster 52 Zone 3B
Cluster 52 Zone 3B Division 28 10-Jan-2018 11-Jan-2018 8:00 AM 16-Jan-2018 B comments
Closed
Installation of PVC conduits & GI boxes for first & roof floor
Approved w/
0210 KHEP-LC-0210 mechanical equipment control system at roof slab of Cluster 52 Zone Cluster 52 Zone 3B Division 26 10-Jan-2018 11-Jan-2018 8:20 AM 13-Jan-2018 B comments
Closed
3B
Installation of PVC conduits & GI boxes for Ground floor mechanical Approved w/
0212 KHEP-LC-0212
equipment control system at First Floor slab of Cluster 54 Zone 3B
Cluster 54 Zone 3B Division 26 10-Jan-2018 11-Jan-2018 9:00 AM 13-Jan-2018 B comments
Closed
Installation of PVC Conduits & GI Boxes for Ground Floor Fire Alarm Approved w/
0213 KHEP-LC-0213
& Detection System at First Floor Slab of Cluster 54 Zone 3B
Cluster 54 Zone 3B Division 26 10-Jan-2018 11-Jan-2018 9:20 AM 16-Jan-2018 B comments
Closed
Installation of PVC Conduits & GI Boxes for Ground Floor Fire Alarm Approved w/
0214 KHEP-LC-0214
& Detection System at First Floor Slab of Cluster 30 Zone 3B
Cluster 30 Zone 3B Division 26 10-Jan-2018 11-Jan-2018 9:40 AM 16-Jan-2018 B comments
Closed
Installation of PVC Conduits & GI Boxes for Ground Floor mechanical Approved w/
0216 KHEP-LC-0216
equipment control system at first floor slab of Cluster 30 Zone 2B
Cluster 30 Zone 2B Division 26 11-Jan-2018 13-Jan-2018 8:30 AM 14-Jan-2018 B comments
Closed
Installation of EMT Conduits & GI boxes for ground & first floor fire
0217 KHEP-LC-0217
alarm & detection system at Cluster 69 Zone 4B
Cluster 69 Zone 4B Division 26 11-Jan-2018 13-Jan-2018 9:00 AM 16-Jan-2018 E Rejected Closed
Installation of EMT Conduits & GI boxes for ground & first floor fire
0217.1 KHEP-LC-0217-01
alarm & detection system at Cluster 69 Zone 4B
Cluster 69 Zone 4B Division 26 20-Jan-2018 21-Jan-2018 8:30 AM 23-Jan-2018 E Rejected Closed
Installation of PVC Conduits & GI Boxes for Ground Floor mechanical Approved w/
0218 KHEP-LC-0218
equipment control system at first floor slab of Cluster 21 Zone 1B
Cluster 21 Zone 1B Division 26 14-Jan-2018 15-Jan-2018 8:00 AM 16-Jan-2018 B comments
Closed
Installation of PVC Conduits & GI Boxes for first & roof floor
Approved w/
0219 KHEP-LC-0219 mechanical equipment control system at roof slab of Cluster 16 Zone Cluster 16 Zone 1B Division 26 14-Jan-2018 15-Jan-2018 8:30 AM 16-Jan-2018 B comments
Closed
1B
Installation of PVC conduits & galvanized steel boxes for first floor Approved w/
0220 KHEP-LC-0220
fire Detection & Alarm System at roof slab of Cluster 16 Zone 1B
Cluster 16 Zone 1B Division 26 14-Jan-2018 15-Jan-2018 9:00 AM 20-Jan-2018 B comments
Closed
Installation of PVC conduits & galvanized steel boxes for first floor Approved w/
0223 KHEP-LC-0223
fire Detection & Alarm System at roof slab of Cluster 71 Zone 4B
Cluster 71 Zone 4B Division 28 16-Jan-2018 16-Jan-2018 8:00 AM 20-Jan-2018 B comments
Closed
Installation of PVC conduits & GI boxes for First & Roof Floor
Approved w/
0224 KHEP-LC-0224 Mechanical Equipment Control system at Roof Slab of Cluster 71 Cluster 71 Zone 4B Division 28 16-Jan-2018 16-Jan-2018 8:20 AM 20-Jan-2018 B comments
Closed
Zone 4B
Installation of 6 inch & 4 inch PVC sleeved for Telecommunication
0225 KHEP-LC-0225 system at grade beam of Cluster 46 4" for water meter IP Cluster 4 Zone 3A Division 27 18-Jan-2018 20-Jan-2018 8:00 AM 22-Jan-2018 A Approved Closed
Connection & 6 for subduct Zone 3A
Inspection of 2C16 AWG cable for SLC loop & AWG cable for power
0226 KHEP-LC-0226 supply for ground & first floor fire detection & alarm system at Cluster 69 Zone 4B Division 28 20-Jan-2018 21-Jan-2018 8:00 AM 23-Jan-2018 E Rejected Closed
Cluster 69 Unit B Zone 4B Cluster 69
Installation of 6 inch & 4 inch PVC sleeved for Telecommunication
Approved w/
0227 KHEP-LC-0227 system at grade beam of Cluster 42 4" for water meter IP Cluster 42 Zone 2B Division 27 21-Jan-2018 22-Jan-2018 8:00 AM 24-Jan-2018 B comments
Closed
Connection & 6 for subduct Zone 2B
Installation of CAT 6A cable telecommunication system at ground & Approved w/
0228 KHEP-LC-0228
first floor of Cluster 69 unit B Zone 4B
Cluster 69 Zone 4B Division 28 21-Jan-2018 22-Jan-2018 8:30 AM 25-Jan-2018 B comments
Closed
Installation of PVC conduits & GI boxes for ground floor Fire Alarm & Approved w/
0229 KHEP-LC-0229
Detection system at first floor slab of Cluster 18 Zone 1B
Cluster 18 Zone 1B Division 28 22-Jan-2018 23-Jan-2018 8:30 AM 24-Jan-2018 B comments
Closed
Installation of PVC conduits & GI boxes for Ground floor mechanical Approved w/
0230.1 KHEP-LC-0230-01
equipment control system at First Floor slab of Cluster 18 Zone 1B
Cluster 18 Zone 1B Division 28 28-Jan-2018 29-Jan-2018 8:00 AM 31-Jan-2018 B comments
Closed
Installation of PVC conduits & GI boxes for ground floor Fire Alarm & Approved w/
0231 KHEP-LC-0231
Detection system at first floor slab of Cluster 66 Zone 4A
Cluster 66 Zone 4A Division 28 22-Jan-2018 23-Jan-2018 9:00 AM 24-Jan-2018 B comments
Closed
Installation of PVC conduits & GI boxes for Ground floor mechanical Approved w/
0232 KHEP-LC-0232
equipment control system at First Floor slab of Cluster 66 Zone 4A
Cluster 66 Zone 4A Division 28 22-Jan-2018 23-Jan-2018 9:30 AM 24-Jan-2018 B comments
Closed
Installation of PVC conduits & Galvanized steel boxes for first floor Approved w/
0236 KHEP-LC-0236
Fire Ditection & Alarm System at roof slab of Cluster 6 Zone 1B
Cluster 6 Zone 1B Division 28 24-Jan-2018 25-Jan-2018 8:00 AM 29-Jan-2018 B comments
Closed
Installation of PVC conduits & GI boxes for Ground floor Fire Alarm & Approved w/
0238 KHEP-LC-0238
Ditection System at first floor slab of Cluster 23 Zone 1B
Cluster 23 Zone 1B Division 28 24-Jan-2018 25-Jan-2018 9:00 AM 29-Jan-2018 B comments
Closed
Installation of PVC conduits & Galvanized steel boxes for first floor Approved w/
0239 KHEP-LC-0239
Fire Ditection & Alarm System at first floor slab of Cluster 60 Zone 3B
Cluster 60 Zone 3B Division 28 25-Jan-2018 27-Jan-2018 8:30 AM 29-Jan-2018 B comments
Closed
Installation of PVC conduits & GI boxes for Ground floor mechanical Approved w/
0241 KHEP-LC-0241
equipment control system at First Floor slab of Cluster 44 Zone 2A
Cluster 44 Zone 2A Division 26 27-Jan-2018 28-Jan-2018 8:30 AM 29-Jan-2018 B comments
Closed
Installation of PVC conduits & Galvanized steel boxes for first floor Approved w/
0242 KHEP-LC-0242
Fire Ditection & Alarm System at first floor slab of Cluster 44 Zone 2A
Cluster 44 Zone 2A Division 28 27-Jan-2018 28-Jan-2018 9:00 AM 29-Jan-2018 B comments
Closed
Installation of PVC conduits & GI boxes for Ground floor mechanical Approved w/
0244 KHEP-LC-0244
equipment control system at First Floor slab of Cluster 23 Zone 1B
Cluster 23 Zone 1B Division 26 28-Jan-2018 29-Jan-2018 8:20 AM 31-Jan-2018 B comments
Closed
Installation of PVC conduits & GI boxes for Ground floor mechanical Approved w/
0245 KHEP-LC-0245
equipment control system at First Floor slab of Cluster 60 Zone 3B
Cluster 60 Zone 3B Division 26 28-Jan-2018 29-Jan-2018 8:40 AM 31-Jan-2018 B comments
Closed
Installation of PVC conduits & Galvanized steel boxes for first floor Approved w/
0250 KHEP-LC-0250
Fire Ditection & Alarm System at roof slab of Cluster 4 Zone 2A
Cluster 4 Zone 2A Division 28 30-Jan-2018 31-Jan-2018 8:00 AM 31-Jan-2018 B comments
Closed
Installation of PVC conduits & GI boxes for first & roof floor
Approved w/
0251 KHEP-LC-0251 mechanical equipment control system at roof slab of Cluster 4 Zone Cluster 4 Zone 1A Division 26 31-Jan-2018 1-Feb-2018 8:00 AM 1-Feb-2018 B comments
Closed
1A
Installation of PVC conduits & galvanized steel boxes for first floor
0252 KHEP-LC-0252
Fire Detection & Alarm System at roof slab Cluster 73 Zone 4B
Cluster 73 Zone 4B Division 28 1-Feb-2018 3-Feb-2018 8:00 AM 4-Feb-2018 E Rejected Closed
Installation of PVC conduits & GI boxes for Fire Alarm & Detection Approved w/
0252.1 KHEP-LC-0252-01
System for first floor at roof floor slab Cluster 63 Zone 3B
Cluster 63 Zone 3B Division 26 6-Feb-2018 7-Feb-2018 8:00 AM 7-Feb-2018 B comments
Closed
Installation of PVC conduits & GI boxes for first & roof floor
Approved w/
0253 KHEP-LC-0253 mechanical equipment control system at roof slab of Cluster 73 Zone Cluster 73 Zone 4B Division 28 1-Feb-2018 3-Feb-2018 8:30 AM 6-Feb-2018 B comments
Closed
4B
Installation of PVC conduits & GI boxes for ground floor mechanical Approved w/
0254 KHEP-LC-0254
equipment control system at first floor slab of Cluster 63 Zone 3B
Cluster 63 Zone 3B Division 26 1-Feb-2018 3-Feb-2018 9:00 AM 6-Feb-2018 B comments
Closed
Installation of PVC conduits & GI boxes for ground floor Fire Alarm &
0255 KHEP-LC-0255
Detection System at First Floor Slab Cluster 63 Zone 3B
Cluster 63 Zone 3B Division 26 1-Feb-2018 3-Feb-2018 9:00 AM 4-Feb-2018 E Rejected Closed
Installation of PVC conduits & GI boxes for ground floor Fire Alarm & Approved w/
0255.1 KHEP-LC-0255-01
Detection System at First Floor Slab Cluster 63 Zone 4B
Cluster 63 Zone 4B Division 26 6-Feb-2018 7-Feb-2018 8:20 AM 7-Feb-2018 B comments
Closed
Installation of PVC conduits & box for Fire Alarm system fopr first Approved w/
0258 KHEP-LC-0258
floor at roof slab in Cluster 33 Zone 2B
Cluster 33 Zone 2B Division 26 6-Feb-2018 7-Feb-2018 9:20 AM 7-Feb-2018 B comments
Closed
Installation of PVC conduits & box for Mechanical control system for Approved w/
0260 KHEP-LC-0260
first floor at roof slab in Cluster 33 Zone 2B
Cluster 33 Zone 2B Division 26 7-Feb-2018 8-Feb-2018 9:10 AM 10-Feb-2018 B comments
Closed
Installation of PVC conduits & box for Mechanical control system for Approved w/
0261 KHEP-LC-0261
roof floor at roof slab in Cluster 33 Zone 2B
Cluster 33 Zone 2B Division 26 7-Feb-2018 8-Feb-2018 9:20 AM 10-Feb-2018 B comments
Closed
Installation of PVC conduits & box for HVAC system temperature Approved w/
0262 KHEP-LC-0262
control for ground floor at first floor slab in Cluster 43 Zone 2A
Cluster 43 Zone 2A Division 26 10-Feb-2018 11-Feb-2018 1:40 PM 13-Feb-2018 B comments
Closed
Installation pf PVC conduits & box for fire alarm system for ground
0263 KHEP-LC-0263
floor at first floor slab in Cluster 43 Zone 2A
Cluster 43 Zone 2A Division 26 13-Feb-2018 14-Feb-2018 8:00 AM 17-Feb-2018 A Approved Closed
Installation of PVC conduits & box for telephone & data system for Approved w/
0264 KHEP-LC-0264
first floor at first floor slab in Cluster 43 Zone 2A
Cluster 43 Zone 2A Division 26 10-Feb-2018 11-Feb-2018 1:40 PM 13-Feb-2018 B comments
Closed
Installation of PVC conduits & box for telephone & data system for Approved w/
0265 KHEP-LC-0265
ground floor at first floor slab in Cluster 43 Zone 2A
Cluster 43 Zone 2A Division 26 10-Feb-2018 11-Feb-2018 2:45 PM 13-Feb-2018 B comments
Closed
Installation of PVC conduits for HVAC system temperature control for Approved w/
0266.1 KHEP-LC-0266-01
first floor at roof slab in Cluster 21 Zone 1B
Cluster 21 Zone 1B Division 26 15-Feb-2018 17-Feb-2018 8:00 AM 19-Feb-2018 B comments
Closed
Installation of PVC conduits & box for telephone & data system for Approved w/
0267 KHEP-LC-0267
ground floor at first floor slab in Cluster 22 Zone 1B
Cluster 22 Zone 1B Division 26 11-Feb-2018 12-Feb-2018 9:45 AM 13-Feb-2018 B comments
Closed
Installation pf PVC conduits & box for fire alarm system for ground Approved w/
0268 KHEP-LC-0268
floor at first floor slab in Cluster 22 Zone 1B
Cluster 22 Zone 1B Division 26 11-Feb-2018 12-Feb-2018 10:00 AM 13-Feb-2018 B comments
Closed
Installation of PVC conduits for HVAC system temperature control for Approved w/
0269.1 KHEP-LC-0269-01
ground floor at first floor slab in Cluster 22 Zone 1B
Cluster 22 Zone 1B Division 26 15-Feb-2018 17-Feb-2018 9:00 AM 19-Feb-2018 B comments
Closed
Installation pf PVC conduits & box for fire alarm system for first floor Approved w/
0270 KHEP-LC-0270
at roof floor slab in Cluster 21 Zone 1B
Cluster 21 Zone 1B Division 26 11-Feb-2018 12-Feb-2018 1:15 PM 13-Feb-2018 B comments
Closed
Installation of PVC conduits for HVAC system temperature control for Approved w/
0272 KHEP-LC-0272
ground floor at first floor slab in Cluster 24 Zone 2B
Cluster 24 Zone 2B Division 26 12-Feb-2018 13-Feb-2018 8:20 AM 14-Feb-2018 B comments
Closed
Installation of PVC conduits for telephone & data system for ground Approved w/
0273 KHEP-LC-0273
floor at first floor slab in Cluster 24 Zone 2B
Cluster 24 Zone 2B Division 26 12-Feb-2018 13-Feb-2018 8:00 AM 20-Feb-2018 B comments
Closed
Installation of PVC conduits for fire alarm system for ground floor at Approved w/
0274 KHEP-LC-0274
first floor slab in Cluster 24 Zone 2B
Cluster 24 Zone 2B Division 26 12-Feb-2018 13-Feb-2018 8:10 AM 13-Feb-2018 B comments
Closed
Installation of PVC conduits & GI boxes for ground floor fire alarm &
0275 KHEP-LC-0275
detection system at forst floor slab of Cluster 50 Zone 3B
Cluster 50 Zone 3B Division 26 13-Feb-2018 14-Feb-2018 8:00 AM 17-Feb-2018 A Approved Closed
Installation of PVC conduits & GI boxes for ground floor mechanical Approved w/
0276 KHEP-LC-0276
equipment control system at first floor slab of Cluster 50 Zone 3B
Cluster 50 Zone 3B Division 26 13-Feb-2018 14-Feb-2018 8:30 AM 25-Feb-2018 B comments
Closed
Installation of PVC conduits & GI boxes for first floor Fire Alarm & Approved w/
0278 KHEP-LC-0278
Detection System at roof floor slab of Cluster 30 Zone 2B
Cluster 30 Zone 2B Division 27 15-Feb-2018 17-Feb-2018 9:30 AM 20-Feb-2018 B comments
Closed
Installation of PVC conduits & GI boxes for ground floor Fire Alarm & Approved w/
0280 KHEP-LC-0280
Detection System at first floor slab of Cluster 64 Zone 3B
Cluster 64 Zone 3B Division 28 15-Feb-2018 17-Feb-2018 9:45 AM 20-Feb-2018 B comments
Closed
Installation of PVC conduits & GI boxes for ground floor mechanical Approved w/
0282 KHEP-LC-0282
equipment control system at first floor slab of Cluster 64 Zone 3B
Cluster 64 Zone 3B Division 26 15-Feb-2018 17-Feb-2018 10:20 AM 20-Feb-2018 B comments
Closed
Installation of PVC conduits & galvanized steel boxes for first floor Approved w/
0283 KHEP-LC-0283
Fire Detection & Alarm System at roof slab of Cluster 9 Zone 1B
Cluster 09 Zone 1B Division 28 15-Feb-2018 17-Feb-2018 9:45 AM 20-Feb-2018 B comments
Closed
Installation of PVC conduits & GI boxes for first & roof floor
0284 KHEP-LC-0284 mechanical equipment control system at roof slab of Cluster 9 Zone Cluster 09 Zone 1B Division 26 15-Feb-2018 17-Feb-2018 10:20 AM Open
1B
Installation of PVC conduits for first floor telecommunication outlets Approved w/
0285 KHEP-LC-0285
at first floor slab of Cluster 24 Zone 2B
Cluster 24 Zone 2B Division 28 15-Feb-2018 17-Feb-2018 10:30 AM 20-Feb-2018 B comments
Closed
Installation of PVC conduits & GI boxes for ground floor mechanical Approved w/
0288 KHEP-LC-0288
equipment control system at first floor slab of Cluster 25 Zone 2B
Cluster 25 Zone 2B Division 26 18-Feb-2018 19-Feb-2018 8:30 AM 20-Feb-2018 B comments
Closed
Installation of PVC conduits & GI boxes for ground floor Fire Alarm &
0289 KHEP-LC-0289
Detection System at first floor slab of Cluster 25 Zone 2B
Cluster 25 Zone 2B Division 28 18-Feb-2018 19-Feb-2018 8:45 AM 20-Feb-2018 E Rejected Closed
Installation of PVC conduits & GI boxes for ground floor Fire Alarm & Approved w/
0289.1 KHEP-LC-0289-01
Detection System at first floor slab of Cluster 25 Zone 2B
Cluster 25 Zone 2B Division 28 21-Feb-2018 22-Feb-2018 9:00 AM 24-Feb-2018 B comments
Closed
Installation of PVC cnduits & galvanized steel boxes for first floor Fire Approved w/
0290 KHEP-LC-0290
Detection & Alarm System at roof slab of Cluster 34 Zone 2B
Cluster 34 Zone 2B Division 28 18-Feb-2018 19-Feb-2018 9:00 AM 20-Feb-2018 B comments
Closed
Installation of PVC conduits & GI boxes for first & roof floor
Approved w/
0291 KHEP-LC-0291 mechanical equipment control system at roof slab of Cluster 34 Zone Cluster 34 Zone 2B Division 28 18-Feb-2018 19-Feb-2018 9:20 AM 21-Feb-2018 B comments
Closed
2B
Installation of PVC conduits & GI boxes for first & roof floor
Approved w/
0292 KHEP-LC-0292 mechanical equipment control system at roof slab of Cluster 18 Zone Cluster 18 Zone 1B Division 26 18-Feb-2018 19-Feb-2018 9:50 AM 20-Feb-2018 B comments
Closed
1B
Installation of PVC cnduits & galvanized steel boxes for first floor Fire Approved w/
0293 KHEP-LC-0293
Detection & Alarm System at roof slab of Cluster 18 Zone 1B
Cluster 18 Zone 1B Division 28 18-Feb-2018 19-Feb-2018 9:00 AM 20-Feb-2018 B comments
Closed
Installation of PVC cnduits & galvanized steel boxes for first floor Fire
0296 KHEP-LC-0296
Detection & Alarm System at roof slab of Cluster 72 Zone 4B
Cluster 72 Zone 4B Division 28 20-Feb-2018 21-Feb-2018 8:00 AM 21-Feb-2018 A Approved Closed
Installation of PVC conduits & GI boxes for first & roof floor
0297 KHEP-LC-0297 mechanical equipment control system at roof slab of Cluster 72 Zone Cluster 72 Zone 4B Division 28 20-Feb-2018 21-Feb-2018 8:30 AM 25-Feb-2018 A Approved Closed
4B
Installation of PVC conduits for telecommunication systemat ground
Approved w/
0298 KHEP-LC-0298 floor of Cluster 20 25mm" for water meter IP Connection & 110mm" Cluster 20 Zone 1B Division 26 20-Feb-2018 21-Feb-2018 9:00 AM 24-Feb-2018 B comments
Closed
for Subduct Zone 1B Cluster 20
Installation of PVC conduits for telecommunication system at ground
Approved w/
0299 KHEP-LC-0299 floor of Cluster 19 25mm" for water meter IP Connection & 110mm" Cluster 19 Zone 1B Division 26 20-Feb-2018 21-Feb-2018 9:20 AM 24-Feb-2018 B comments
Closed
for Subduct Zone 1B Cluster 19
Installation of PVC conduits for telecommunication system at ground
Approved w/
0300 KHEP-LC-0300 floor of Cluster 19 25mm" for water meter IP Connection & 110mm" Cluster 08 Zone 1B Division 26 20-Feb-2018 21-Feb-2018 9:40 AM 24-Feb-2018 B comments
Closed
for Subduct Zone 1B Cluster 08
Installation of PVC conduits for telecommunication system at ground
Approved w/
0301 KHEP-LC-0301 floor of Cluster 17 25mm" for water meter IP Connection & 110mm" Cluster 17 Zone 1B Division 26 20-Feb-2018 21-Feb-2018 10:00 AM 24-Feb-2018 B comments
Closed
for Subduct Zone 1B Cluster 17
Installation of PVC cnduits & galvanized steel boxes for first floor Fire Approved w/
0302 KHEP-LC-0302
Detection & Alarm System at roof slab of Cluster 58 Zone 3B
Cluster 58 Zone 3B Division 28 21-Feb-2018 22-Feb-2018 8:00 AM 24-Feb-2018 B comments
Closed
Installation of PVC conduits & GI boxes for first & roof floor
0303 KHEP-LC-0303 mechanical equipment control system at roof slab of Cluster 58 Zone Cluster 58 Zone 3B Division 28 21-Feb-2018 22-Feb-2018 8:30 AM 25-Feb-2018 E Rejected Closed
3B
Installation of PVC conduits & GI boxes for first & roof floor
0303.1 KHEP-LC-0303-01 mechanical equipment control system at roof slab of Cluster 58 Zone Cluster 58 Zone 3B Division 28 26-Feb-2018 27-Feb-2018 8:30 AM 28-Feb-2018 A Approved Closed
3B
Installation of PVC conduits and Galvanized steel Box for first floor Approved w/
0305 KHEP-LC-0305
fire Detection and Alarm system at Roof Slabe of Cluster 35
Cluster 35 Zone 2B Division 28 22-Feb-2018 24-Feb-2018 8:00 AM 25-Feb-2018 B comments
Closed
Installation of PVC conduits and GI boxes for first & roof mechanical Approved w/
0306 KHEP-LC-0306
equipment control sytem at Roof slabe of cluster 35
Cluster 35 Zone 2B Division 26 22-Feb-2018 24-Feb-2018 8:30 AM 26-Feb-2018 B comments
Closed
Installation of PVC conduits and Galvanized steel Boxes for first floor Approved w/
0307 KHEP-LC-0307
fire Detection and Alarm system at Roof Slabe of Cluster 44
Cluster 44 Zone 2A Division 28 22-Feb-2018 24-Feb-2018 9:00 AM 25-Feb-2018 B comments
Closed
Installation of PVC conduits and GI boxes for first & roof mechanical
0308 KHEP-LC-0308
equipment control sytem at Roof slabe of cluster 44
Cluster 44 Zone 2A Division 26 22-Feb-2018 24-Feb-2018 9:30 AM 25-Feb-2018 A Approved Closed
Installation of PVC conduits and Galvanized steel Boxes for first floor
0314 KHEP-LC-0314 fire Detection and Alarm system at Roof Slabe of Cluster 66 Cluster 60 Zone 3B Division 28 24-Feb-2018 25-Feb-2018 9:20 AM 25-Feb-2018 A Approved Closed
Zone 3B Cluster 60
Installation of PVC conduits and GI boxes for first & roof mechanical
0315 KHEP-LC-0315 equipment control sytem at Roof slabe of cluster 60 Zone 3B Cluster Cluster 60 Zone 3B Division 26 24-Feb-2018 25-Feb-2018 9:40 AM 26-Feb-2018 A Approved Closed
60
Installation of PVC conduits and Galvanized steel Boxes for first floor
fire Detection and Alarm system at Roof Slabe of Cluster 23 Approved w/
0316 KHEP-LC-0316
Zone 1B
Cluster 23 Zone 1B Division 28 24-Feb-2018 25-Feb-2018 9:30 AM 25-Feb-2018 B comments
Closed
Cluster 23
Installation of PVC conduits and GI boxes for first & roof mechanical
0317 KHEP-LC-0317 equipment control sytem at Roof slabe of cluster 23 Zone 1B Cluster Cluster 23 Zone 1B Division 28 24-Feb-2018 25-Feb-2018 9:50 AM 26-Feb-2018 A Approved Closed
23
Installation of PVC conduits and Galvanized steel Boxes for first floor
0323 KHEP-LC-0323 Cluster 54 Zone 3B Division 28 28-Feb-2018 1-Mar-2018 8:00 AM Open
Fire Detection and Alarm system at Roof Slab of Cluster 54 Zone 3B
Installation of PVC conduits and GI boxes for first & roof floor
0324 KHEP-LC-0324 mechanical equipment control sytem at Roof slab of cluster 54 Zone Cluster 54 Zone 3B Division 26 28-Feb-2018 1-Mar-2018 8:00 AM Open
3B
Installation of PVC conduits and GI boxes for Ground floor Fire Alarm Cluster 65
0325 KHEP-LC-0325 Zone 4A Division 28 28-Feb-2018 1-Mar-2018 9:00 AM
and Detection System at First Floor slab of Cluster 65 Zone 4A
Installation of PVC conduits and GI boxes for Ground floor Fire Alarm
0329 KHEP-LC-0329 Cluster 26 Zone 2B Division 28 28-Feb-2018 1-Mar-2018 10:40 AM
and Detection System at First Floor slab of Cluster 26 Zone 2B
Installation of EMT Conduits & GI boxes for FCU thermostat at first
0330 KHEP-LC-0330 Cluster 15 Zone 1B Division 28 28-Feb-2018 1-Mar-2018 11:00 AM
floor of Cluster 15 Zone 1B
Installation of PVC conduits & GI boxes for Telecom outlet at first
0331 KHEP-LC-0331 Cluster 15 Zone 1B Division 28 28-Feb-2018 1-Mar-2018 11:20 AM
floor of Cluster 15 Zone 1B
STRUCTURAL
PLUMBING
SR NO MATERIAL RECIEVING INSPECTION NO. ACTIVITIES / INSPECTION ITEMS
ARCHITECTURAL
0001 KHEP-MRI-AR-0001-00 Gypsum Ceiling Materials Zone 4B, Cluster 69
Extruded Polystyrene XPS Right Thermal Insulation Board 28-30 Density, Size
0005 KHEP-MRI-AR-0005-00
1250mm x 600mm x 50mm thk - Alamadar Vapotherm - 8000 m2
USG Sheetrock joint compound 28kg RYD 13bags, USG Sheetrock joint
0006 KHEP-MRI-AR-0006-00
compound 28kg JED 8bags
0007 KHEP-MRI-AR-0007-00 FR 16mm * 1.2 * 3.0m GYPBOARD TE-MADA
Water Proofing for wet Areas, Delmon Durashield Heavy duty permium
0008 KHEP-MRI-AR-0008-00
Waterproofing coating (20kg)
0010 KHEP-MRI-AR-0010-00 Durosan Interior EGGSL SK RAL (9001, 9016, 6019, 1015) 18L
Kitchen Cabinet made by 18mm with glossy color, Size 215x303x319x cm,
0012 KHEP-MRI-AR-0012-00
Counter Top Staron, Vanity (6pcs) (Steel angle 15 pcs)
0014 KHEP-MRI-AR-0014-00 Masonry and Plastering Accessories (wamco - wadi maramer trading Est)
0014.1 KHEP-MRI-AR-0014-01 Masonry and Plastering Accessories (wamco - wadi maramer trading Est)
0017 KHEP-MRI-AR-0017-00 KNF Block Factory - 40x20x20 Concrete Hollow Block Units
0018 KHEP-MRI-AR-0018-00 KNF Block Factory - 40x20x20 Concrete Hollow Block Units
0019 KHEP-MRI-AR-0019-00 Masonry and Plastering Accessories (wamco - wadi maramer trading Est)
0031 KHEP-MRI-AR-0031-00 Masonry & Plastering Accessories WAMCO - Wadi Maramer Trading Est.
0039 KHEP-MRI-AR-0039-00 Plumbing fixtures & sanitary Accessories SATAMINA Sham net Trading
0051 KHEP-MRI-AR-0051-00 Overhead Coiling Door for Garage - ROLLC for Trading Co. Ltd
0052 KHEP-MRI-AR-0052-00 Joddran cement Al Safwa cemet Co. for Finishing 50kg
0053 KHEP-MRI-AR-0053-00 Metal framing system ROOTS GROUP Saudi Allied Metal Industries
0054 KHEP-MRI-AR-0054-00 Sulieman A. R. Namlah Factory Concrete Hollow Bock Units
0055 KHEP-MRI-AR-0055-00 MADA Gypsum
CIVIL
Epoxy coated steel bars receiving inspection for 10mm, 12mm, 16mm &
0001 KHEP-MRI-CI-0001-00
20mm
0002 KHEP-MRI-CI-0002-00 Concure WB 309 (Fosroc) for curing Compound as per attached deliveries
0006.1 KHEP-MRI-CI-0006-01 CMU blocks per attached deliveries. Saudi ready mix concrete co. ltd.
0011 KHEP-MRI-CI-0011-00 FRP Structural manhole Dia. 120mm, Thickness 12mm. ( Mockup Manhole)
0011.1 KHEP-MRI-CI-0011-01 FRP Structural manhole Dia. 120mm, Thickness 12mm. ( Mockup Manhole)
0022.1 KHEP-MRI-CI-0022-01 Inspection of GRP Manholes Dia 1200mm supplier (Techno fiber) 33 pieces
0026 KHEP-MRI-CI-0026-00 Sika Bitumen - 60sa, Packing : 200LT, Unit : DRM, Delivered Qty : 25
Reinforcement steel ( epoxy rebar ) , manufacturer ,vendor Bawan metal
0027 KHEP-MRI-CI-0027-00 industries ø 8mm ( 4 ton ) - ø 10 mm ( 30 ton ) - ø 12mm ( 60 ton ) - ø
20mm ( 46 ton )
Reinforcement steel ( epoxy rebar ) , manufacturer ,vendor : Bawan metal
industries reinforcement steel ( plain steel ) , manufacturer ,vendor : RAJHI
0028 KHEP-MRI-CI-0028-00
STEEL ø 10mm ( 8 ton ) - ø 12 mm ( 84 ton ) - ø 16mm ( 60 ton ) - ø 20mm
( 52 ton )
Reinforcement steel ( epoxy rebar ) , manufacturer ,vendor : Bawan metal
industries reinforcement steel ( plain steel ) , manufacturer ,vendor : RAJHI
0029 KHEP-MRI-CI-0029-00
STEEL ø 10mm ( 126 ton ) - ø 12 mm ( 148 ton ) - ø 16mm ( 164 ton ) - ø
20mm ( 12 ton )
0031 KHEP-MRI-CI-0031-00 Tie Wire (electro Galvanized as per attached dilivery note
Reinforcement Steel Plain Steel Manhufacturer Vendor Rajhi Steel 10mm-
0032 KHEP-MRI-CI-0032-00
6ton 12mm-112ton 16mm-8ton 20mm-86ton 25mm-4ton
Reinfocement Steel Epoxy Rebar Manufacturer Vendor BRC Industries 20mm-
10ton 10mm-14ton 16mm 4ton
0033 KHEP-MRI-CI-0033-00
Reinforcement Steel Plain Steel Manufacturer Vendor RAJHI Steel 12mm-
450ton 20mm-60ton
Reinforcement steel bar Plain Steel 12mm - 450 ton
0034 KHEP-MRI-CI-0034-00
Manufaturer & Vendor RAJHI STEEL
Inspection of GRP INS.Chamber Dia 600 & 900 mm Supplier Technofiber 2
0035 KHEP-MRI-CI-0035-00
Piieces
Reinforcement steel plain steel manufacturer vendor RAJHI STEEL 16mm
0036 KHEP-MRI-CI-0036-00
60ton
Reinforcement steel plain steel manufacturer vendor RAJHI STEEL 12mm
0037 KHEP-MRI-CI-0037-00
30ton 25mm 4ton 16mm 26ton
0038 KHEP-MRI-CI-0038-00 Tie Wire electro Galvanized vendor name IKK unitech quantity 10 ton
ELECTRICAL
PVC conduit,adapter & Coupling,black,high impact & heavy duty grade type
0001 KHEP-MRI-EL-0001-00
Site Office 1 Staging Area(Warehouse)
25mm ø and 50mmø HDPE Pipe SDR11 Black 6"ø and 4"ø PVC Pipe NEMA
0002 KHEP-MRI-EL-0002-00
TC-6 Gray PVC coupling and Elbow
a) 6"ø and 4"ø PVC Pipe NEMA TC-6 and TC-8 b) 6"ø Fab PVC Coupling c)
0002.1 KHEP-MRI-EL-0002-01
4"ø UPVC Elbow 48" Radius NEMA TC-9
a) 6"ø and 4"ø PVC Pipe NEMA TC-6 and TC-8 b) 6"ø Fab PVC Coupling c)
0002.2 KHEP-MRI-EL-0002-02
4"ø UPVC Elbow 48" Radius NEMA TC-9
0002.3 KHEP-MRI-EL-0002-03 a) 6"ø and 4"ø PVC Pipe NEMA TC-6 and TC-8 b) 6"ø Fab PVC Coupling
0002.4 KHEP-MRI-EL-0002-04 150 pcs 4"ø PVC Pipe NEMA TC-6 and 200 pcs 4"ø PVC Pipe NEMA TC-6
0008 KHEP-MRI-EL-0008-00 Flexible conduits and fittings as per attached dilivery note
0009 KHEP-MRI-EL-0009-00 Non Fusible Disconnect switch 30A 600V 3Pole Mode General Electric
Meterial receiving inspection for lighting fixtures as per attached meterial
0010 KHEP-MRI-EL-0010-00
delevery note
HVAC
Metal Ducts and Fittings GL Gauge 24 & 26 (Assorted Sizes) Cleats Gauge 24
0001 KHEP-MRI-HVAC-0001-00
Type ''C" & "S"
Metal Ducts and Fittings GL Gauge 24 & 26 (Assorted Sizes) Cleats Gauge 24
0001.1 KHEP-MRI-HVAC-0001-01
Type ''C" & "S"
Metal Ducts and Fittings GI 26,24 Assorted size as per attached 10 Cluster B2
0002 KHEP-MRI-HVAC-0002-00
Blenum Box, Rectangular VCD Split Damper
Metal Ducts and Fittings GI 26,24 Assorted size for SAD,RAD,EXAD & FAD at
GF,FF & RF Villa type B2 Cluster 10 as per attached
0002.1 KHEP-MRI-HVAC-0002-01
Metal Duct Rizer GI 26 Assorted size for Cluster 1 B2 as per Attached
Plenum Box Rectangular VCD Split Damper for Villa 1 type B2 as pe rattached
Metal Ducts and Fittings GI 26,24 Assorted size for SAD,RAD,EXAD & FAD at
GF,FF & RF Villa type B2 Cluster 10 as per attached
0002.2 KHEP-MRI-HVAC-0002-02
Metal Duct Rizer GI 26 Assorted size for Cluster 1 B2 as per Attached
Plenum Box Rectangular VCD Split Damper for Villa 1 type B2 as pe rattached
Inspection for FCU unit Concealed Multy - v 111 indoor Concealed duct
0003 KHEP-MRI-HVAC-0003-00
indoor Manufacturer LG
Metal duct & fitting GI 26,24 assorted size SAD,RAD, EXAD & FAD at
0004 KHEP-MRI-HVAC-0004-00
GF,FF,RF villa type A6 Cluster 1 as per attached
0005 KHEP-MRI-HVAC-0005-00 Inspection Exhaus fan unit for mock up only Manufacturer Greenheck
0006 KHEP-MRI-HVAC-0006-00 Inspection of Multy V-IV out door unit for mock up only Manufacturer LG
MECHANICAL
0001 KHEP-MRI-ME-0001-00 Galvanized Steel Pipes,ERW,Sch. 40/SASO 1011 Sizes 6", 4", 3"
Glass Fiber Reinforced Plastic (GRP) and Coupler Sizes 800mm, 600mm,
0002 KHEP-MRI-ME-0002-00 500mm
Zone 1A
Glass Fiber Reinforced Plastic (GRP) and Coupler Sizes 800mm, 600mm,
0002.1 KHEP-MRI-ME-0002-01 500mm
Zone 1A
PRP Pipes & Fitings (Various Size as per Attached list) uPVC Floor Traps
0018 KHEP-MRI-ME-0018-00
110x75x50x50mm (32pcs)
0019 KHEP-MRI-ME-0019-00 Galvanized Pipes & Fitttings (Various Size as per Attached list)
Un plasticized Polyvinyl Chloride Pipes, Class 5, Sch.80 (intend as Pipe
0020 KHEP-MRI-ME-0020-00
Sleeves) Sizes: 1" (5pcs) 6" (83pcs)
0021 KHEP-MRI-ME-0021-00 PPR Tee 25mm,PN25 (1080 pcs)
Pipe hangers with EPDM Lining, ANSI/MSS sp-69 & sp-58, Type12 (for
0022 KHEP-MRI-ME-0022-00
plumbing and Drainage)
Galvanized Pipes for Fire Fighting System {(Size 1"(457pcs), 2.5" (7pcs), 3"
0023 KHEP-MRI-ME-0023-00
(176pcs)}
Warning tape, Detecable "Caution: Buried Storm Line Below", Green
0024 KHEP-MRI-ME-0024-00 (16Rolls), Warning tape, Detecable "Caution: Buried Potable Water Line
Below", Green (24Rolls)
Unplasticised Polyvinyl Chloride Fittings, Various Types & Sizes, PN16,
0025 KHEP-MRI-ME-0025-00 Solvent Joint (As Per Attached List) Polyvinyl Chloride Floor Traps, Solvent
Joint 110x75x50x50mm (192 Pcs)
Malleable Iron Fittings, Galvanized #150, ASTM A197, "Gourd" Brand Elbows,
0026 KHEP-MRI-ME-0026-00
Equal Tees, Reducing Couplings (Various Sizes As per Attached List)
Mechanical Couplings and Fittings for fire Fighting System, "Well fit" Brand
0027 KHEP-MRI-ME-0027-00 Elbows, Equal Tees, Mechanical branch lets, Reducers, Couplings, cap
(various Sizes As per Attached List)
Mechanical Couplings and Fittings for fire Fighting System, "Well fit" Brand
0027.1 KHEP-MRI-ME-0027-01 Elbows, Equal Tees, Mechanical branch lets, Reducers, Couplings, cap
(various Sizes As per Attached List)
Warning tape, Detectable "Caution: Sewer Line ", Green (13Rolls), Warning
tape, Detectable "Caution: Irrigation Water Line ", Blue (19Rolls)
0028 KHEP-MRI-ME-0028-00
Manufacturer: ELEFIT
ARABIA FACTORY CO.
Thermal Closed Cell Elastomeric Foam Insulation for DHW and Condensate
0029 KHEP-MRI-ME-0029-00 Drain: 1/2" thick x 7/8" dia. 1.8meter/pc =84 pcs 1/2" thick x 21/8"
dia. 1.8meter/pc =28 pcs
0030 KHEP-MRI-ME-0030-00 UPVC - MMP 1KG - Solvent Cement & Cleaner
0031 KHEP-MRI-ME-0031-00 UPVC Pipe, Class 4, PN10 (Almunif Pipe)
UPVC Pipe Fittings for ( soil,Vent,West,condensate drainage) Meti (pn6,pn16)
0032 KHEP-MRI-ME-0032-00
Almunif pipe
0033 KHEP-MRI-ME-0033-00 UPVC Pipe (Short Piece) Class 4 R/J
UPVC Wye Tee Branch 45 Deg, SCh. 40 R/J Size 200, UPVC Elbow 45 Deg,
0034 KHEP-MRI-ME-0034-00
Sch. 40 R/J Size 200 mm
0035 KHEP-MRI-ME-0035-00 UPVC Coupling Repaire, Class 4 R/J Size 200 mm 20pcs
UPVC Pipe and Fittings Class 4, R/J Size 160 mm (Pipe, WTE Tee, Repair
0036 KHEP-MRI-ME-0036-00
Socket, Elbow 45) UPVC Repair Socket Class 4 R/J Size 200 mm
AVK Gate Valve (200 mm - PN 16, 400 mm - PN16) & Dismantling joint (200
0037 KHEP-MRI-ME-0037-00
mm - PN 16, 400 mm)
UPVC Pipe for Irrigation System (CL.5, PN 16 R/J) - Size 160mm, 110mm &
0038 KHEP-MRI-ME-0038-00
90mm
HDPE Pipe for Potable Water System & Fire Water (PE100, SDR11, PN16
0039 KHEP-MRI-ME-0039-00
BT.w) Size 140mm, 160mm & 200mm
HDPE Pipe for Potable Water System & Fire Water (PE100, SDR11, PN16
0040 KHEP-MRI-ME-0040-00
BT.w) Size 110mm, 63mm
HDPE Pipe Fittings for Potable Water System & Fire Water (PE100, SDR11,
0041 KHEP-MRI-ME-0041-00
PN16 BT.w) Elbow, TEE & Flange Adaptor With Steel Flange PP Coated
0051 KHEP-MRI-ME-0051-00 PPR Pipe PN20 & Fittings PN25 for Water supply system Metitherm MMP
Pipe Fitting & unions 50mm & smaller threaded end fittings class 150 for fire
0052 KHEP-MRI-ME-0052-00
protection
0053 KHEP-MRI-ME-0053-00 PPR Fittings PN25 for Water Supply System, Metitherm - MMP
ERW Pipe Galvanized CS Pipe ASTM A53 Schedule 40 - Grade B - Al Jazeera
0054 KHEP-MRI-ME-0054-00
Pipes
STRUCTURAL
PLUMBING
A Approved
E Rejected
SUBMITTED FOR RESPONDED AS
SUBMITTED DATE DISCIPLINE DATE RESPONDED
CODE STATUS CODE STATUS
Approved w/
5-Sep-2017 Architectural 1 Approval 7-Sep-2017 B comments
Approved w/
5-Sep-2017 Architectural 1 Approval 7-Sep-2017 B comments
Approved w/
5-Sep-2017 Architectural 1 Approval 7-Sep-2017 B comments
5-Sep-2017 Architectural 1 Approval 7-Sep-2017 A Approved
Approved w/
7-Oct-2017 Architectural 1 Approval 9-Oct-2017 B comments
Approved w/
11-Oct-2017 Architectural 1 Approval 15-Oct-2017 B comments
22-Oct-2017 Architectural 1 Approval 26-Oct-2017 A Approved
Approved w/
9-Nov-2017 Architectural 1 Approval 13-Nov-2017 B comments
Approved w/
7-Dec-2017 Architectural 1 Approval 12-Dec-2017 B comments
Approved w/
7-Dec-2017 Architectural 1 Approval 12-Dec-2017 B comments
10-Dec-2017 Architectural 1 Approval 20-Dec-2017 E Rejected
13-Dec-2017 Architectural 1 Approval 16-Dec-2017 A Approved
Approved w/
6-Aug-2017 Civil 1 Approval 7-Aug-2017 B comments
17-Jul-2017 Civil 1 Approval 19-Jul-2017 E Rejected
2-Nov-2017 Civil 1 Approval 4-Nov-2017 A Approved
Approved w/
5-Oct-2017 Civil 1 Approval 8-Oct-2017 B comments
Approved w/
11-Oct-2017 Civil 1 Approval 12-Oct-2017 B comments
Approved w/
30-Nov-2017 Civil 1 Approval 7-Dec-2017 B comments
Approved w/
15-Jan-2018 Civil 1 Approval 20-Jan-2018 B comments
Approved w/
1-Feb-2018 Civil 1 Approval 4-Feb-2018 B comments
Approved w/
6-Feb-2018 Civil 1 Approval 10-Feb-2018 B comments
Approved w/
30-May-2017 Electrical 1 Approval 3-Jun-2017 B comments
Approved w/
1-Jun-2017 Electrical 1 Approval 6-Jun-2017 B comments
Approved w/
25-Dec-2017 Electrical 1 Approval 27-Dec-2017 B comments
Approved w/
5-Dec-2017 HVAC 1 Approval 7-Dec-2017 B comments
Approved w/
3-Jun-2017 Mechanical 1 Approval 4-Jun-2017 B comments
Approved w/
17-Aug-2017 Mechanical 1 Approval 24-Aug-2017 B comments
Approved w/
18-Feb-2018 Mechanical 1 Approval 21-Feb-2018 B comments
19-Feb-2018 Mechanical 1 Approval 20-Feb-2018 A Approved
REMARKS COMMENTS
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Open
Open
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Closed
Open
Closed
Closed
Closed
Closed
Closed
Closed
A Approved
B Approved w/ Comments
E Rejected
SUBMITTED FOR RESPONDED AS
SR NO OTHER NO ACTIVITIES / INSPECTION ITEMS SUBMITTED DATE DISCIPLINE DATE RESPONDED INTERNEL REFERENCE NO REMARKS COMMENTS
CODE STATUS CODE STATUS
Revise and
0000 KHEP-WI-OT-001-00 Work Instruction for Documents Numbering 19-Jan-2017 Other 1 Approval 28-Jan-2017 C Resubmit
KHEP-Q-WI-0001 Closed
Approved w/
0000.1 KHEP-WI-OT-001-01 Work Instruction for Documents Numbering 2-Feb-2017 Other 1 Approval 5-Feb-2017 B Comments
KHEP-Q-WI-0001-01 Closed
Approved w/
0000.2 KHEP-WI-OT-001-02 Work Instruction for Documents Numbering 1-Mar-2017 Other 1 Approval 2-Mar-2017 B Comments
KHEP-Q-WI-0001-02 Closed
0001 KHEP-OT-0001-00 Company Profile of Fugro-Suhaimi 15-Jan-2017 Other 1 Approval 26-Jan-2017 C Revise & Resubmit Company Profile Closed
Company Profile of Fugro-Suhaimi / Proposed as Third
0001.1 KHEP-OT-0001-01
Party Testing Laboratory of K H E P
30-Jan-2017 Other 1 Approval 31-Jan-2017 A Approved Company Profile Closed
Approved w/
0002 KHEP-OT-0002-00 Site Mobilization Layout Plan 17-Jan-2017 Other 1 Approval 26-Jan-2017 B Comments
KAUST-C2-SD-001-R0 Closed
0003 KHEP-OT-0003-00 Project Procurement Plan 25-Jan-2017 Other 1 Approval 30-Jan-2017 C Revise & Resubmit KAUST-PROC-001 Closed
0003.1 KHEP-OT-0003-01 Project Procurement Plan 10-Jun-2017 Other 1 Approval 11-Jun-2017 C Revise & Resubmit KAUST-PROC-001-01 Closed
0003.2 KHEP-OT-0003-02 Project Procurement Plan 22-Jul-2017 Other 1 Approval 26-Jul-2017 A Approved KAUST-PROC-001-02 Closed
Approved w/
0004 KHEP-OT-0004-00 Project Quality Plan 17-Jan-2017 Other 1 Approval 24-Jan-2017 B Comments
KAUST-GA-PQP-001-Rev.00 Closed
0005 KHEP-OT-0005-00 Health & Safety Quality Plan 17-Jan-2017 Other 1 Approval 30-Jan-2017 C Revise & Resubmit KAUST-GA-HSE-001-Rev.00 Closed
Approved w/
0005.1 KHEP-OT-0005-01 Health & Safety Plan 1-Feb-2017 Other 1 Approval 7-Feb-2017 B Comments
KAUST-GA-HSE-001-Rev.01 Closed
0006 KHEP-OT-0006-00 Hazard Identification Plan 17-Jan-2017 Other 1 Approval 30-Jan-2017 C Revise & Resubmit KAUST-GA-HIP-001-Rev.00 Closed
Approved w/
0007 KHEP-OT-0007-00 Environmental Management Plan 17-Jan-2017 Other 1 Approval 30-Jan-2017 B Comments
KAUST-GA-EMP-001-Rev.00 Closed
Approved w/
0008 KHEP-OT-0008-00 Project Organizational Chart 25-Jan-2017 Other 1 Approval 9-Mar-2017 B Comments
NA Closed
0008.1 KHEP-OT-0008-01 Project Organizational Chart and CVs 24-Jul-2017 Other 1 Approval 26-Oct-2017 C Revise & Resubmit KHEP-OT-0008-01 Closed
0009 KHEP-OT-0009-00 Emergency Response Plan 1-Feb-2017 Other 1 Approval 7-Feb-2017 A Approved KHEP-OT-HSE-002 Closed
0010 KHEP-OT-0010-00 Risk Assessment for Earth Work and Excavation 1-Feb-2017 Other 1 Approval 7-Feb-2017 A Approved kHEP-RA-003-00 Closed
Risk Assessment for Loading and Unloading of Material
0011 KHEP-OT-0011-00
Manually or with Crane
1-Feb-2017 Other 1 Approval 7-Feb-2017 A Approved kHEP-RA-004-00 Closed
0012 KHEP-OT-0012-00 Risk Assessment for Installation of Chain Link Fence 1-Feb-2017 Other 1 Approval 7-Feb-2017 A Approved kHEP-RA-005-00 Closed
0013 KHEP-OT-0013-00 ITP Schedule 1-Feb-2017 Other 1 Approval 6-Feb-2017 E Rejected KHEP-OT-0013-00 Closed
Approved w/
0013.1 KHEP-OT-0013-01 ITP Schedule 15-Mar-2017 Other 1 Approval 26-Mar-2017 B Comments
KHEP-OT-0013-01 Closed
0013.2 KHEP-OT-0013-02 ITP Schedule 12-Apr-2017 Other 1 Approval 15-Apr-2017 A Approved KHEP-OT-0013-02 Closed
0013.3 KHEP-OT-0013-03 Revised ITP Schedule 8-Jul-2017 Other 1 Approval 13-Jul-2017 A Approved KHEP-OT-0013-02 Closed
0014 KHEP-OT-0014-00 Traffic Management Plan 1-Feb-2017 Other 1 Approval 7-Feb-2017 C Revise & Resubmit KHEP-GA-HSE-002 Closed
Approved w/
0014.1 KHEP-OT-0014-01 Traffic Management Plan 16-Feb-2017 Other 1 Approval 19-Feb-2017 B Comments
KHEP-OT-0014-01 Closed
Approved w/
0015 KHEP-OT-0015-00 CV of Mr. Basim Al Saleem as Safety Manager 16-Feb-2017 Other 1 Approval 19-Feb-2017 B Comments
KHEP-OT-0015-00 Closed
0016 KHEP-OT-0016-00 Shop Drawing Submittal Plan 1-Feb-2017 Other 1 Approval 9-Feb-2017 C Revise & Resubmit KHEP-OT-0016-00 Closed
0017 KHEP-OT-0017-00 Security Plan 16-Feb-2017 Other 1 Approval 19-Feb-2017 A Approved KHEP-OT-0017-00 Closed
Approved w/
0018 KHEP-OT-0018-00 CV of Mr. Hedayatullah Ansari as Safety Supervisor 16-Feb-2017 Other 1 Approval 19-Feb-2017 B Comments
KHEP-OT-0018-00 Closed
0019 KHEP-OT-0019-00 CV of Mr. Lijish John as Safety Supervisor 25-Feb-2017 Other 1 Approval 27-Feb-2017 A Approved KHEP-OT-0019-00 Closed
0020 KHEP-OT-0020-00 KAUST Base Line Schedule (Rev - 00) 08-03-2017 26-03-2017 Other 1 Approval 28-Mar-2017 A Approved KHEP-OT-0020-00 Closed
0020.1 KHEP-OT-0020-01 KAUST Base Line Schedule (Rev - 01) 7-Nov-2017 Other 1 Approval 13-Nov-2017 C Revise & Resubmit KHEP-OT-0020-01 Closed
0020.2 KHEP-OT-0020-02 KAUST Base Line Schedule (Rev - 01) 5-Dec-2017 Other 1 Approval 19-Dec-2017 C Revise & Resubmit KHEP-OT-0020-02 Closed
Approved w/
0020.3 KHEP-OT-0020-03 KAUST Base Line Schedule (Rev - 01) 4-Feb-2018 Other 1 Approval 5-Feb-2018 B Comments
KHEP-OT-0020-03 Closed
0021 KHEP-OT-0021-00 Structural Calculation Sheets 28-Mar-2017 Other 1 Approval 30-Mar-2017 C Revise & Resubmit KHEP-OT-0021-00 Closed
0022 KHEP-OT-0022-00 Progres (Invoice No.01) for the Month of February 2017 30-Mar-2017 Other 1 Approval KHEP-OT-0022-00 Open
0024 KHEP-OT-0024-00 Columns Scaffolding Design 1-Apr-2017 Other 1 Approval 5-Apr-2017 C Revise & Resubmit KHEP-OT-0024-00 Closed
0026 KHEP-OT-0026-00 GAP Proposal for each cluster 8-Apr-2017 Other 1 Approval 13-Apr-2017 C Revise & Resubmit KHEP-OT-0026-00 Closed
Approved w/
0026.1 KHEP-OT-0026-01 GAP Proposal with table for all cluster 24-Apr-2017 Other 1 Approval 7-May-2017 B Comments
KHEP-OT-0026-01 Closed
Approved w/
0029 KHEP-OT-0029-00 Sand Supply: Hamida Hamad Al-Salmi Est 22-Apr-2017 Other 1 Approval 30-Apr-2017 B Comments
KHEP-OT-0029-00 Closed
0030 KHEP-OT-0030-00 CV of Mr. MD Sharique Khan as Safety Officer 26-Apr-2017 Other 1 Approval 30-Apr-2017 A Approved KHEP-OT-0030-00 Closed
0031 KHEP-OT-0031-00 CV of Mr. Ibrahim Khan as Safety Officer 26-Apr-2017 Other 1 Approval 30-Apr-2017 A Approved KHEP-OT-0031-00 Closed
0032 KHEP-OT-0032-00 CV of Mr. Azad Ahmad as Safety Officer 26-Apr-2017 Other 1 Approval 30-Apr-2017 A Approved KHEP-OT-0032-00 Closed
0033 KHEP-OT-0033-00 CV of Mr. Abdullah M. Gubrazli as Safety Officer 1-May-2017 Other 1 Approval 8-May-2017 A Approved KHEP-OT-0033-00 Closed
CV of Mr. Yasser Mohammed Gamal as Civil QC Inspector
0034 KHEP-OT-0034-00
(Concrete Work's)
2-May-2017 Other 1 Approval 9-May-2017 E Rejected KHEP-OT-0034-00 Closed
0044 KHEP-OT-0044-00 Progress (Invoice No.03) for the Month of May 2017 6-Jul-2017 Other 1 Approval 8-Jul-2017 A Approved KHEP-OT-0044-00 Closed
Approved w/
0045 KHEP-OT-0045-00 Pre Qualification Modern Times Technical System / Rheem 20-Jul-2017 Other 1 Approval 27-Jul-2017 B Comments
KHEP-OT-0045-00 Closed
0052 KHEP-OT-0052-00 Progress (Invoice No.04) for the Month of June 2017 29-Jul-2017 Other 1 Approval 30-Jul-2017 A Approved KHEP-OT-0052-00 Closed
0059 KHEP-OT-0059-00 CASTING YARD FOR PRE-CAST MANHOLES 9-Aug-2017 Other 1 Approval Recalled KHEP-OT-0059-00 Closed
Company Pre Qualification -
0060 KHEP-OT-0060-00 (STC) The Saudi Transformers co. Ltd 10-Aug-2017 Other 1 Approval 11-Sep-2017 E Rejected KHEP-OT-0060-00 Closed
Exhaust Fans
Approved w/
0062 KHEP-OT-0062-00 Manufacturers: Maico 13-Aug-2017 Other 1 Approval 15-Aug-2017 B Comments
KHEP-OT-0062-00 Closed
(Danyair/Elient) Exhaust fans
Company Pre Qualification -
0063 KHEP-OT-0063-00 Edison / Intreplast Co.Ltd. 13-Aug-2017 Other 1 Approval 15-Aug-2017 E Rejected KHEP-OT-0063-00 Closed
0064 KHEP-OT-0064-00 CV of Eng. Jul-Amin Radi Abdurajid as Civil QC Inspector 13-Aug-2017 Other 1 Approval 13-Aug-2017 A Approved KHEP-OT-0064-00 Closed
Approved w/
0065 KHEP-OT-0065-00 CV of Eng. Jimmuel N.Mendoza as Electrical QC Inspector 13-Aug-2017 Other 1 Approval 20-Aug-2017 B Comments
KHEP-OT-0065-00 Closed
0073 KHEP-OT-0073-00 Specifications, KAUST Housing Expansion Project, PHASE 1 24-Aug-2017 Other 2 Information KHEP-OT-0073-00 Open
0074 KHEP-OT-0074-00 CV of Eng. Cesar A.Andes as Civil QC 28-Aug-2017 Other 1 Approval 29-Aug-2017 A Approved KHEP-OT-0074-00 Closed
0075 KHEP-OT-0075-00 CV of Eng. Alfredo Dorotayo Balido Jr.as Architectural QC 28-Aug-2017 Other 1 Approval 29-Aug-2017 A Approved KHEP-OT-0075-00 Closed
0076 KHEP-OT-0076-00 Progress (Invoice No.05) for the Month of July 2017 29-Aug-2017 Other 1 Approval 30-Aug-2017 A Approved KHEP-OT-0076-00 Closed
Company Pre Qualification META SWITCH GEAR Co.
0077 KHEP-OT-0077-00 Manufacturer 30-Aug-2017 Other 1 Approval 13-Sep-2017 C Revise & Resubmit KHEP-OT-0077-00 Closed
of: Electric Meter
CV of Mr. Mohammad Arif
0078 KHEP-OT-0078-00 as Safety Supervisor 12-Sep-2017 Other 1 Approval 26-Sep-2017 C Revise & Resubmit KHEP-OT-0078-00 Closed
0086.1 KHEP-OT-0086-01 Calibration Certificate 4-Nov-2017 Other 1 Approval 6-Nov-2017 A Approved KHEP-OT-0086-01 Closed
CV of Mr. RAMDIE I.DIAZ
Approved w/
0087 KHEP-OT-0087-00 as Safety Officer 2-Oct-2017 Other 1 Approval 3-Oct-2017 B Comments
KHEP-OT-0087-00 Closed
0092 KHEP-OT-0092-00 Progress (Invoice No.06) for the Month of August 2017 3-Oct-2017 Other 1 Approval 4-Oct-2017 C Revise & Resubmit KHEP-OT-0092-00 Closed
0092.1 KHEP-OT-0092-01 Progress (Invoice No.06) for the Month of August 2017 15-Oct-2017 Other 1 Approval 25-Oct-2017 C Revise & Resubmit KHEP-OT-0092-01 Closed
0092.2 KHEP-OT-0092-02 Progress (Invoice No.06) for the Month of August 2017 25-Oct-2017 Other 1 Approval 5-Nov-2017 A Approved KHEP-OT-0092-02 Closed
0093 KHEP-OT-0093-00 PLUMBING, Electrical water Heater Sizing Calculation 3-Oct-2017 Other 2 Information 23-Oct-2017 C Revise & Resubmit KHEP-OT-0093-00 Closed
0107 KHEP-OT-0107-00 LV SINGLE LINE DIAGRAM SHEET 1 to 18 1-Nov-2017 Other 1 Approval 14-Nov-2017 C Revise & Resubmit 1356DF-E-EG-101 to 118 Closed
Approved w/
0108 KHEP-OT-0108-00 Internal Fire Fighting Hydraulic Calculation 1-Nov-2017 Other 1 Approval 13-Nov-2017 B Comments
KHEP-OT-0108-00 Closed
KHEP-OT-0109-00 Related
Sample - Light Fixtures - GE /
Document: 1. KHEP-
0109 KHEP-OT-0109-00 Trilux / Bega / Jiso / Goccia 6-Nov-2017 Other 1 Approval 25-Nov-2017 C Revise & Resubmit
MS-EL-0020-02
Closed
Vendor : HRFA
2. KHEP-MS-EL-0020-03
KHEP-RIFC-HVAC-B2-DW-GF-001
0110 KHEP-OT-0110-00 B2 First Floor, Ground Floor, Roof Floor Ducting Layout 1-Nov-2017 Other 1 Approval 7-Nov-2017 C Revise & Resubmit KHEP-RIFC-HVAC-B2-DW-GF-003 Closed
KHEP-RIFC-HVAC-B2-DW-GF-005
KHEP-RIFC-HVAC-A6-DW-GF-001
Cluster A6 HVAC Ducting Layout Ground & First, Roof Floor
0113 KHEP-OT-0113-00 5-Nov-2017 Other 1 Approval 12-Nov-2017 C Revise & Resubmit KHEP-RIFC-HVAC-A6-DW-GF-003 Closed
KHEP-RIFC-HVAC-A6-DW-GF-005
KHEP-RIFC-HVAC-A6-DW-GF-001
CLUSTER A6, HVAC DUCTING LAYOUT AND VENTILATION
Approved w/ KHEP-RIFC-HVAC-A6-DW-GF-003
0113.1 KHEP-OT-0113-01 RISER DIAGRAM Ground & First, Roof Floor & Ducting 22-Nov-2017 Other 1 Approval 3-Dec-2017 B Comments KHEP-RIFC-HVAC-A6-DW-GF-005
Closed
layout and Ventilation Riser Diagram
KHEP-RIFC-HVAC-A6-DW-RD-007
0114 KHEP-OT-0114-00 Progress (Invoice No.07) for the Month of September 2017 6-Nov-2017 Other 1 Approval 11-Nov-2017 C Revise & Resubmit KHEP-OT-0114-00 Closed
0114.1 KHEP-OT-0114-01 Progress (Invoice No.07) for the Month of September 2017 20-Nov-2017 Other 1 Approval 23-Nov-2017 A Approved KHEP-OT-0114-01 Closed
0120 KHEP-OT-0120-00 RFI Log Summary " August 2017" 20-Nov-2017 Other 1 Approval KHEP-OT-0120-00 Open
KHEP-RIFC-PL-WS-B2-GF-001
Approved w/
0121 KHEP-OT-0121-00 Cluster B2 Ground , First & Roof Floor Water Supply Layout 20-Nov-2017 Other 1 Approval 23-Nov-2017 B Comments
KHEP-RIFC-PL-WS-B2-FF-002 Closed
KHEP-RIFC-PL-WS-B2-RF-003
Approved w/
0126 KHEP-OT-0126-00 CV of Mr. Nabil Musa Awwad Post of Procurement Manager 23-Nov-2017 Other 1 Approval 24-Dec-2017 B Comments
KHEP-OT-0126-00 Closed
KHEP-RIFC-ME-DR-B2-GF-001
Approved w/
0128 KHEP-OT-0128-00 Cluster B2 Ground , First & Roof Floor Drainage Layout 2-Dec-2017 Other 1 Approval 7-Dec-2017 B Comments
KHEP-RIFC-ME-DR-B2-FF-002 Closed
KHEP-RIFC-ME-DR-B2-RF-003
KHEP-RIFC-ME-DR-A6-GF-001
Approved w/
0130 KHEP-OT-0130-00 Cluster A6 Ground , First & Roof Floor Drainage Layout 4-Dec-2017 Other 1 Approval 13-Dec-2017 B Comments
KHEP-RIFC-ME-DR-A6-FF-002 Closed
KHEP-RIFC-ME-DR-A6-RF-003
KHEP-RIFC-PL-WS-A6-GF-001
KHEP-RIFC-PL-WS-A6-FF-002
Approved w/
0131 KHEP-OT-0131-00 Cluster A6 Ground , First & Roof Floor Water Supply Layout 4-Dec-2017 Other 1 Approval 16-Dec-2017 B Comments
KHEP-RIFC-PL-WS-A6-RF-003 Closed
KHEP-RIFC-PL-A6-WS-RD-004
Approved w/
0132 KHEP-OT-0132-00 Sample - Low voltage Cable & Single core wires - LS0H 5-Dec-2017 Other 1 Approval 1-Jan-2018 B Comments
KHEP-OT-0132-00 Closed
0134 KHEP-OT-0134-00 Progress (Invoice No.08) for the Month of October 2017 11-Dec-2017 Other 1 Approval 12-Dec-2017 A Approved KHEP-OT-0134-00 Closed
Approved w/
0135 KHEP-OT-0135-00 Cv of Eng Asim Ali as Assistant QA Manager 17-Dec-2017 Other 1 Approval 25-Dec-2017 B Comments
KHEP-OT-0135-00 Closed
KHEP-RIFC-HVAC-BC6-DW-GF-
001
CLUSTER BC6, HVAC DUCTING LAYOUT - Ground floor, Approved w/ KHEP-RIFC-HVAC-BC6-DW-FF-
0136 KHEP-OT-0136-00
First floor, Roof floor Ducting layout
18-Dec-2017 Other 1 Approval 23-Dec-2017 B Comments 003
Closed
KHEP-RIFC-HVAC-BC6-DW-RF-
005
KHEP-RIFC-HVAC-BC4-DW-GF-
001
CLUSTER BC4, HVAC DUCTING LAYOUT - Ground floor, Approved w/ KHEP-RIFC-HVAC-BC4-DW-FF-
0137 KHEP-OT-0137-00
First floor, Roof floor Ducting layout
18-Dec-2017 Other 1 Approval 23-Dec-2017 B Comments 003
Closed
KHEP-RIFC-HVAC-BC4-DW-RF-
005
Cluster Type B2 - Internal Fire Fighting Hydraulic
0138 KHEP-OT-0138-00
Calculation
23-Dec-2017 Other 1 Approval 27-Dec-2017 A Approved KHEP-OT-0138-00 Closed
Approved w/
0139 KHEP-OT-0139-00 Cluster B2 - Schematic Riser Diagram Water Suply 23-Dec-2017 Other 1 Approval 1-Jan-2018 B Comments
KHEP-RIFC-PL-B2-WS-RD-004 Closed
Approved w/
0140 KHEP-OT-0140-00 CV of Nadeem Aftab as Safety Officer 24-Dec-2017 Other 1 Approval 1-Jan-2018 B Comments
KHEP-OT-0140-00 Closed
KHEP-RIFC-PL-BC4-WS-GF-001
KHEP-RIFC-PL-BC4-WS-FF-002
Cluster BC4 Water Supply Layout Ground Floor First Floor
0143 KHEP-OT-0143-00
Roof Floor & Water Supply Raiser Diagram
31-Dec-2017 Other 1 Approval 6-Jan-2018 C Revise & Resubmit KHEP-RIFC-PL-BC4-WS-RF-003 Closed
KHEP-RIFC-PL-BC4-WS-RD-004
KHEP-RIFC-PL-A4-WS-GF-001
KHEP-RIFC-PL-A4-WS-FF-002
Cluster A4 Water Supply Layout Ground Floor First Floor
0144 KHEP-OT-0144-00
Roof Floor & Water Supply Raiser Diagram
31-Dec-2017 Other 1 Approval 6-Jan-2018 C Revise & Resubmit KHEP-RIFC-PL-A4-WS-RF-003 Closed
KHEP-RIFC-PL-A4-WS-RD-004
Approved w/
0145 KHEP-OT-0145-00 CV of Umar Hayat as Safety Officer 2-Jan-2018 Other 1 Approval 20-Jan-2018 B Comments
KHEP-OT-0145-00 Closed
0146 KHEP-OT-0146-00 Company Pre Qualification - Beauty Design Company 2-Jan-2018 Other 1 Approval 11-Jan-2018 C Revise & Resubmit KHEP-OT-0146-00 Closed
0147 KHEP-OT-0147-00 Progress (Invoice No.09) for the Month of November 2017 2-Jan-2018 Other 1 Approval 3-Jan-2018 A Approved KHEP-OT-0147-00 Closed
KHEP-RIFC-HVAC-B2-PW-GF-002
KHEP-RIFC-HVAC-B2-PW-FF-004
0149 KHEP-OT-0149-00 Cluster B2 Refrigerant Piping 3-Jan-2018 HVAC 1 Approval 9-Jan-2018 C Revise & Resubmit
KHEP-RIFC-HVAC-B2-PW-RD-008
Closed
Approved w/
0150 KHEP-OT-0150-00 CV of Adnan Hassan as Project Control Manager 4-Jan-2018 Other 1 Approval 9-Jan-2018 B Comments
KHEP-OT-0150-00 Closed
0151 KHEP-OT-0151-00 Cluster BC4 HVAC Riser Diagram 7-Jan-2018 HVAC 1 Approval 11-Jan-2018 A Approved KHEP-OT-0151-00 Closed
0152 KHEP-OT-0152-00 Cluster BC6 HVAC Riser Diagram 7-Jan-2018 HVAC 1 Approval 11-Jan-2018 A Approved KHEP-OT-0152-00 Closed
0153 KHEP-OT-0153-00 Calculation for Korean Scaffolding System 7-Jan-2018 Structural 1 Approval 11-Jan-2018 E Rejected KHEP-OT-0153-00 Closed
0153.1 KHEP-OT-0153-01 Calculation Light Duty Scaffolding System 27-Feb-2018 Structural 1 Approval KHEP-OT-0153-01 Open
0154 KHEP-OT-0154-00 AL Jawdah Ceramics Company Pre Qualification 7-Jan-2018 Architectural 1 Approval 15-Jan-2018 C Revise & Resubmit KHEP-OT-0154-00 Closed
Approved w/
0155 KHEP-OT-0155-00 CV of Eng Clemente A. Regilme as QC Mechanical 7-Jan-2018 Other 1 Approval 15-Jan-2018 B Comments
KHEP-OT-0155-00 Closed
1356DF-T-TJ-100
1356DF-T-TJ-101
1356DF-T-TJ-103
1356DF-T-TJ-104
1356DF-T-TJ-105
1356DF-T-TJ-106
0157 KHEP-OT-0157-00 Telecom Network Plan 14-Jan-2018 Other 1 Approval 31-Jan-2018 A Approved
1356DF-T-TJ-107
Closed
1356DF-T-TJ-108
1356DF-T-TJ-109
1356DF-T-TJ-110
1356DF-T-TJ-111
1356DF-T-TJ-112
Company Pre Qualification The Pest Control & Fumigation
0158 KHEP-OT-0158-00
Co. Ltd
17-Jan-2018 Other 1 Approval 27-Jan-2018 A Approved KHEP-OT-0158-00 Closed
0159 KHEP-OT-0159-00 Templates for submittal through Document Controller 18-Jan-2018 Other 1 Approval 29-Jan-2018 C Revise & Resubmit KHEP-OT-0159-00 Closed
0160 KHEP-OT-0160-00 Telecom Network Plan 1 to 20 20-Jan-2018 Other 1 Approval 31-Jan-2018 A Approved KHEP-OT-0160-00 Closed
Ter fiber optics distribution diagram 1/2 & 2/2 & Network
0161 KHEP-OT-0161-00
block diagram
24-Jan-2018 Other 1 Approval 21-Feb-2018 C Revise & Resubmit KHEP-OT-0161-00 Closed
0163 KHEP-OT-0163-00 CV of Eng Ehab Fath Abbas Raslan as QA/QC Manager 29-Jan-2018 Other 1 Approval 6-Feb-2018 A Approved KHEP-OT-0163-00 Closed
1356DF-T-DT-406
1356DF-T-SL-501c
1356DF-T-SL-501d
0164 KHEP-OT-0164-00 Typical Duct Formation Details 30-Jan-2018 Other 1 Approval 21-Feb-2018 C Revise & Resubmit 1356DF-T-SL-503 Closed
1356DF-T-SL-504
1356DF-T-SL-505
1356DF-T-SL-506
0165 KHEP-OT-0165-00 QA/QC Organization Chart 4-Feb-2018 Other 1 Approval 11-Feb-2018 C Revise & Resubmit KHEP-OT-0165-00 Closed
0166 KHEP-OT-0166-00 Progress (Invoice No.10) for the Month of December 2017 7-Feb-2018 Other 1 Approval 11-Feb-2018 A Approved KHEP-OT-0166-00 Closed
0167 KHEP-OT-0167-00 CV of Quaid Jan as QC Low Current 7-Feb-2018 Other 1 Approval 21-Feb-2018 E Rejected KHEP-OT-0167-00 Closed
Cluster BC4 Ground floor First floor & Roof floor Drainage Approved w/
0168 KHEP-OT-0168-00
Layout
8-Feb-2018 Other 1 Approval 21-Feb-2018 B Comments
KHEP-OT-0168-00 Closed
Approved w/
0169 KHEP-OT-0169-00 CV of Naveed Khan as QC Civil 11-Feb-2018 Other 1 Approval 14-Feb-2018 B Comments
KHEP-OT-0169-00 Closed
Approved w/
0171 KHEP-OT-0171-00 CV of Wassim Akram as QC Mechanical 14-Feb-2018 Other 1 Approval 14-Feb-2018 B Comments
KHEP-OT-0171-00 Closed
0172 KHEP-OT-0172-00 Reviced Procurement Schedule 14-Feb-2018 Other 1 Approval KHEP-OT-0172-00 Open
0173 KHEP-OT-0173-00 Company Prequalification - Ritver Paints & Coatings Co. 14-Feb-2018 Architectural 1 Approval 24-Feb-2018 E Rejected KHEP-OT-0173-00 Closed
0174 KHEP-OT-0174-00 Company Prequalification - Exa Alfanar 26-Feb-2018 Architectural 1 Approval KHEP-OT-0174-00 Open
0175 KHEP-OT-0175-00 Company Prequalification - ORCA 26-Feb-2018 Architectural 1 Approval KHEP-OT-0175-00 Open
0176 KHEP-OT-0176-00 RFI Log Summary " January 2018" 27-Feb-2018 Other 1 Approval KHEP-OT-0176-00 Open
0177 KHEP-OT-0177-00 RFI Log Summary " December 2017" 27-Feb-2018 Other 1 Approval KHEP-OT-0177-00 Open
ARCHITECTURAL
0001 KHEP-CT-AR-0001-00
CIVIL
0001 KHEP-CT-31-0001-00 Soil Sample Test Reports 17-Jan-2017
ELECTRICAL
0001 KHEP-CT-EL-0001-00
HVAC
0001 KHEP-CT-HVAC-0001-00
MECHANICAL
0001 KHEP-CT-ME-0001-00
STRUCTURAL
0001 KHEP-CT-ST-0001-00
A Approved
B Approved w/ Comments
E Rejected
SUBMITTED FOR RESPONDED AS
DISCIPLINE DATE RESPONDED INTERNEL REFERENCE NO
CODE STATUS CODE STATUS
Closed
Closed
Closed
Closed
Closed
Closed
Open
SR NO RISK ASSESSMENT NO. ACTIVITIES / INSPECTION ITEMS SUBMITTED DATE
B Approved w/ Comments
E Rejected
SUBMITTED FOR RESPONDED AS
DISCIPLINE DATE RESPONDED INTERNEL REFERENCE NO
CODE STATUS CODE STATUS
Others 4&5 Clarification & Handling KHEP-LE-0001
Others KHEP-LE-0002
Others KHEP-LE-0003
Others KHEP-LE-0004
Others KHEP-LE-0006
Others KHEP-LE-0007
Others KHEP-LE-0008
Others KHEP-LE-0009
Others KHEP-LE-0010
Others KHEP-LE-0011
Others KHEP-LE-0012
REMARKS COMMENTS
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
SR NO NCR NO (NCR) - Discription DECIPLINE
CIVIL
23-Jul-17 13-Aug-17 -
STATUS
Open
SR NO SITE INTRUCTION NO
1 KHEP-SI-CI-0001
2 KHEP-SI-CI-0002
3 KHEP-SI-CI-0003
1 KHEP-SI-ME-0001
2 KHEP-SI-ME-0002
3 KHEP-SI-ME-0003
4 KHEP-SI-ME-0004
5 KHEP-SI-ME-0005
6 KHEP-SI-ME-0006
7 KHEP-SI-ME-0007
8 KHEP-SI-ME-0008
9 KHEP-SI-ME-0009
1 KHEP-SI-AR-0001
(SITE INTRUCTION) - Discription
CIVIL
Improper Storing Of Meterials
Column Honeycomb
Additional Openings for Exhaust Fans
MECHANICAL
Improper Storing Of Meterials
Meterials used prior to Inspection
Backfilling prior to Inspection
Slab Casting Prior to Inspection's
Riser pipes Closed with Plaster and Tile without Inspection
Metal Duct & Fittings
HVAC Duct Open Ends
HVAC Duct Work (C2 A6 / C13, C14 & C15 B2)
Wall Closure Prior to Hydrotest (C15 B2, C1 A6)
ARCHITECTURAL
Faulty Block Works
DECIPLINE KAUST RECEVING DATE AL-BAWANI RESPOND DATE KAUST RE-EVALUATE DATE STATUS