Instruction:
The Contractor/Supplier/Seller must complete this form in English and provide suitable evidence as proof that
they meet the criteria
Reference to the evidence documents must be stated in the Remarks Column
Once all boxes are completed and suitable evidence is provided the Contractor/Supplier/Seller must complete
and sign the bottom row and then return the form to Heineken for approval
If approved this Pre-qualification is valid for up to 3 years (subject to adequate safety performance)
Note: Non-completion of this form or failure to follow the above instruction will delay approval to tender
Additional comments:
Send evidence and completed form to: Heineken Global Projects & Engineering
Global Safety: Adam Sivell or Tjeert Rozema
Email: adam.sivell@heineken.com or tjeert.rozema@heineken.com
Conclusion Heineken Global Supply Chain Projects & Engineering:
: The Contractor/Supplier/Seller has been qualified for the minimum safety requirements of the work