Date: 06/09/2017

UNIDO CLARIFICATIONS no. 1

Request for Proposal (RFP) No. 1100085103

PROVISION OF TECHNOLOGIES FOR THE DECHLORINATION AND DECONTAMINATION OF


POLYCHLORINATED BIPHENYLS (PCBS)

UNIDO Project: ENVIRONMENTALLY SOUND MANAGEMENT AND FINAL DISPOSAL OF PCBS IN


INDONESIA

(SAP ID 130249)

Questions Answers
1. Referring to Appendix 3, A, 2. a):” Time required for … Please be informed that bidders can mention of the optimum
assuming one 8-hr shift day and 200 days of operation per year operating conditions in their offer and indicate the approximate
…” time required for a specific concentration.

A cycle (of de-chlorination of PCB oil/ decontamination of


electrical equipment) may take longer than 8 hours/day. Shutting
down the installations during the process is not advisable, since
this situation leads to an increase in plant operation costs (energy
consumption).
In order to ensure optimal operation of the installations, it is
necessary to operate in 3 shifts of 8 hours/day.
In this case, please specify if the operation of the installations is
limited to only 8 hours/day.

2. Kindly mention if the request regarding the operation for 8 Please be informed that the 8 hours/day is not a mandatory
hours/day is a mandatory condition. condition.