Project: Rehabilitation and Up-gradation of Repalle to Eeppurpalem Section from

Km:129/927 to Km:195/000 of NH-214A (New NH-216) to two lanes With Paved


Shoulder in the State of Andhra Pradesh under NHDP-IV through Engineering
,Procurement & Construction (EPC) basis.

Authority MINISTRY OF ROAD TRANSPORT & HIGHWAYS

Authority Engineer : M/s WADIA TECHNO-ENGINEERING SERVICIES LIMITED.

EPC Contractor : M/s BSCPL Infrastrucure Limited

GRADATION OF COARSE AGGREGATE


Laboratory Sampled by

Source Date of Sampling

Location Date of Testing

Total Wt. Type of Material

Individual Aggregate Gratation

As per IS Specification
Cumtve.Wt Weight Passing
Sieve Size Weight
Retained Retained
(mm) Retained (gms) 10mm Single Size 20mm Single Size
(gms) (%) (%)

40 - 100

20 - 85-100

12.5 100 -

10 85-100 0-20

4.75 0-20 0-5

2.36 0-5 -

Pan - -

Remarks:………………………………………………………………………………………………………………………………………

Contractor Representative Authority Engineer Representative


NATIONAL HIGHWAYS AUTHORITY OF INDIA
4 Laning of Armur-AdloorYellareddy on Nagapur-Hyderabad section of NH7
from Km 308.000 to Km 367.000 in the state of Andhrapradesh under
NHDP Phase-II on DBFOT Basis Package No. AP-1
Concessionaire :Navayuga Dichpally Tollway Private Limited
Consultant
EPC Contractor :Navayuga Engineering Company Limited

WORK SHEET FOR ADJUSTMENT OF MOISTURE CONTENT


Report No: :Batching Plant Date:

Mix Design With Penna Cement


Design Mix SSD
Cement 40 mmAgg. 20 mm Agg. 10mm Agg. Sand Admixture Water Total
Grade
Kg Kg Kg Kg Kg Kg Kg Kg/m3
Fosroc SP Batching
Brand / Source Penna Own Crusher Kolipak
432 Plant
M15 PCC

M20 PCC

M20 RCC

M25 RCC

M30 RCC

M35 RCC

Specific Gravity

Water Absorption (B)

Natural Water Content and Ajustment Batch Plant Weigth Kg/m 3

Wet Weigth of Aggregate Kg

Dry Weigth of Aggregate Kg

Natural Water Content ©

Ajustment Batch Wt.After Moisture Correction in Kg/m 3 [Ajusted Wt.Agg = A(1+(C-B)/100)]

Cement 40 mm Agg. 20 mm Agg. 10mm Agg. Sand Admixture Water Total


Grade
Kg Kg Kg Kg Kg Kg Kg Kg/m3

M15 PCC

M20 PCC

M20 RCC

M25 RCC

M30 RCC

M35 RCC

Remarks:……………………………………………………………………………………………………………………………………………………………………………..

Tested by Checked by
NECL
Material Engineer : Concessionaire's Representative

EPC 'S Representative


IC's Representative
Project: Rehabilitation and Up-gradation of Repalle to Eeppurpalem Section from
Km:129/927 to Km:195/000 of NH-214A (New NH-216) to two lanes With Paved Shoulder
in the State of Andhra Pradesh under NHDP-IV through Engineering ,Procurement &
Construction (EPC) basis.

Authority MINISTRY OF ROAD TRANSPORT & HIGHWAYS

Authority Engineer : M/s WADIA TECHNO-ENGINEERING SERVICIES LIMITED.

EPC Contractor : M/s BSCPL Infrastrucure Limited

GRADATION OF COARSE AGGREGATE


Laboratory Sampled by

Source Date of Sampling

Location Date of Testing

Total Wt. Type of Material

Individual Aggregate Gratation

As Per IS Specification
Cumtve.Wt Weight Passing
Sieve Size Weight 20mm 40mm
Retained Retained 10mm 20mm 40mm
(mm) Retained (gms) Single Single
(gms) (%) (%) Single Size Graded Graded
Size Size

40 - 100 85-100 100 95-100

20 - 85-100 0-20 95-100 30-70

12.5 100 - - - -

10 85-100 0-20 0-5 25-55 10-35

4.75 0-20 0-5 - 0-10 0-5

2.36 0-5 - - - -

Pan - - - - -

Remarks:………………………………………………………………………………………………………………………………………

Contractor Representative Authority Engineer Representative