Preparation before hoisting:: 吊装前的准备
吊装前的准备::

1. The equipment prepar


preparation 设备准备
A. Prepare all tools and equipment before hoisting the unit and need including rigging tools.
tools Please
find the recommended tools list as attached.在开始吊装工作之前,必须按照要求配备如下设备
必须按照要求配备如下设备:

Rapid wrenc 快速扳手 113, 14, 19, 22, 24mm

Material ID 860567171, © CommScope, Inc., Proprietary Page 2 of 28


Rev B, V.01, February 2014 All Rights Reserved
Material ID 860567171, © CommScope, Inc., Proprietary Page 3 of 28
Rev B, V.01, February 2014 All Rights Reserved
B. All of operators must be personal safety before state any work. The attachment is the process of
the personal safety and climb. 进行工作之前,所有的现场人员必须做好个人安全防护
所有的现场人员必须做好个人安全防护,防护及攀
爬流程见附件。

Material ID 860567171, © CommScope, Inc., Proprietary Page 4 of 28


Rev B, V.01, February 2014 All Rights Reserved
Material ID 860567171, © CommScope, Inc., Proprietary Page 5 of 28
Rev B, V.01, February 2014 All Rights Reserved
Material ID 860567171, © CommScope, Inc., Proprietary Page 6 of 28
Rev B, V.01, February 2014 All Rights Reserved
Material ID 860567171, © CommScope, Inc., Proprietary Page 7 of 28
Rev B, V.01, February 2014 All Rights Reserved
Material ID 860567171, © CommScope, Inc., Proprietary Page 8 of 28
Rev B, V.01, February 2014 All Rights Reserved
2. Installation team 人员配置
6~7 members for each team: a leader, a windlass operator, 2 tower crew, 2 or 3 operators pull the tagging
rope.
每个小组标准配置为 7 人:一个组长 三名成员负责安全绳。
一个组长,一个卷扬机操作员,两个天线安装员,三名成员负责安全绳

Material ID 860567171, © CommScope, Inc., Proprietary Page 9 of 28


Rev B, V.01, February 2014 All Rights Reserved
3. Uploading & Unloading
loading the SiteRise. 装卸
a. Prepare the loading platform.需要准备一个可供装卸货物的装载平台

b. Forklift moving or handling: 使用叉车装卸


Forklift driven in direction ---- the red mark 叉车必须注意叉臂的指示
Forklift arm length request ( For crate length 3.5m): not less than 2.5m if driven in width direction
direction.
叉臂长度不得小于 2.5 米

c. Manually hang up string location 手动装卸的抬升点

Material ID 860567171, © CommScope, Inc., Proprietary Page 10 of 28


Rev B, V.01, February 2014 All Rights Reserved
d. Check the ShockWatch
If either sensor is RED, Please complete the inspect procedure. 如果任一传感器为红色,请完成
如果任一传感器为红色
检检程检。

e. Confirm the SiteRise unit Serial number. 确认 SiteRise 型号检列号。

Material ID 860567171, © CommScope, Inc., Proprietary Page 11 of 28


Rev B, V.01, February 2014 All Rights Reserved
4. Open the packing of the SiteRise unit. 拆卸 SiteRise 包装。
包装

5. Preparation
ation at top of tower before hoisting 吊装前的塔上准备
a. Attach the pulley 滑轮设置
b. Fix the mini Gin pole if required. 吊装支架安装

Material ID 860567171, © CommScope, Inc., Proprietary Page 12 of 28


Rev B, V.01, February 2014 All Rights Reserved
The mini Gin pole should be fixed above of the antenna system at least 2M. .利用卷扬机,将
利用卷扬机
支臂吊上并固定于塔身,其安装位置应高于天线安装位置至少 2M,并设置绳索
支臂吊上并固定于塔身 并设置绳索。

6. Fix the capstan hoist 卷扬机的固定


The capstan hoist must be fixing to the leg of the tower, and keep it to horizontality. Other operate,
please fellow the instruction. 卷扬机需固定在铁塔基座,并保持水平。按规定穿入
按规定穿入绳索。

7. Preparing before hoisting 吊装前的天线准备

• Confirm all of waterproof points at the ports of antenna; filter and RRU. Also check all of the bolts

and nuts should be tighten


tightened. 确认各连接器的防水状态, 并检检所有的螺栓和螺母应该被紧
固。

Material ID 860567171, © CommScope, Inc., Proprietary Page 13 of 28


Rev B, V.01, February 2014 All Rights Reserved
• Push
ush the reel support into the Site Rise, and install the liftex and Crosby.将轮架插入天线安装
将轮架
架,并将吊装带连接于吊装点
并将吊装带连接于吊装点

提升轮架

吊索及吊装点
间需用 U 型螺
栓固定

天线安装支架

Material ID 860567171, © CommScope, Inc., Proprietary Page 14 of 28


Rev B, V.01, February 2014 All Rights Reserved
正视方向 轮架插入时
需与天线抱
杆末端吻合

侧视方向

将提升轮架插
入天线抱杆

天线抱杆末端

Material ID 860567171, © CommScope, Inc., Proprietary Page 15 of 28


Rev B, V.01, February 2014 All Rights Reserved
8. Lifting the SiteRise unit into upright position slowly
lowly and carefully. Then
install the tower mount brackets and side plates on to the antenna mount
brackets of SiteRise.

Material ID 860567171, © CommScope, Inc., Proprietary Page 16 of 28


Rev B, V.01, February 2014 All Rights Reserved
并将安装支架装于 SiteRise
将天线提升至垂直状态,并将安装支架装于

9. Slowly and carefully to lift SiteRise unit into upright position.


osition. Remove lift
dolly from the unit once it is off the ground. 提升天线至垂直状态,并取下轮
提升天线至垂直状态
架。

Material ID 860567171, © CommScope, Inc., Proprietary Page 17 of 28


Rev B, V.01, February 2014 All Rights Reserved
10. Use capstan to lift the SiteRise unit to correct position on the tower.
按照标准站位吊升天线。

11. Fix the SiteRise unit to tower according to the instruction.按装配图固定天


按装配图

Material ID 860567171, © CommScope, Inc., Proprietary Page 18 of 28


Rev B, V.01, February 2014 All Rights Reserved
Material ID 860567171, © CommScope, Inc., Proprietary Page 19 of 28
Rev B, V.01, February 2014 All Rights Reserved
Fix
ix the SiteRise unit at top of tower.

Material ID 860567171, © CommScope, Inc., Proprietary Page 20 of 28


Rev B, V.01, February 2014 All Rights Reserved
12. Installing the trunk cable. 主馈缆安装

Material ID 860567171, © CommScope, Inc., Proprietary Page 21 of 28


Rev B, V.01, February 2014 All Rights Reserved
Use the standoff to support the cable reel during cable lifting.Install
lifting. the hoisting grip
and fix it at three points on the cabl
cable.将吊网安装于集束缆上,并绑扎固定三点吊升 并绑扎固定三点吊升。

Material ID 860567171, © CommScope, Inc., Proprietary Page 22 of 28


Rev B, V.01, February 2014 All Rights Reserved
Material ID 860567171, © CommScope, Inc., Proprietary Page 23 of 28
Rev B, V.01, February 2014 All Rights Reserved
主干光纤馈线的吊装
•一般来说这种电缆的吊装应用类似 7 /8“同轴电缆,因缆线品种较多,吊装前请务必记下电缆的检列号以
/8 记下电缆的检列号以
供将来参考。
•光纤相当脆弱,在吊装过程中必须受到
受到严密保护。
•吊装时,请不要去除连接端的保护软管
请不要去除连接端的保护软管。
•连接端的光纤弯曲半径不得小于 30mm
30mm。电缆最小弯曲半径及承载拉力可在产品说明书或者官方网站找到
产品说明书或者官方网站找到。
•提升网应该绑扎在缆线端光纤分叉点后
提升网应该绑扎在缆线端光纤分叉点后 6 英寸处,保护管及缆身各增加一个固定牵引点。

•吊装过程中,确保缆线及保护管不会被阻挡
确保缆线及保护管不会被阻挡。
•安装温度范围为- 30℃到+70℃。
•吊装必须使用原厂提升网(型号:19256B
19256B –C)

•馈线夹间距 0.9M-1.2M。

13. 安装馈线夹 Installation hangers

Hanger P/N Description


SHK-19-3-PV2
PV2 RFA812 series hybrid cable hanger, 3 run stack, kit of 10
SHK-24-3-PV2
PV2 RFA810 series hybrid cable hanger, 3 run stack, kit of 10
SHK-78-3-P-10 RFA808 series hybrid cable hanger, 3 run
run stack, kit of 10
SHK-19-1-PV2
PV2 RFA812 series hybrid cable hanger, single run, kit of 10
SHK-24-1-PV2
PV2 RFA810 series hybrid cable hanger, single run, kit of 10
SHK-78-1-P-10 RFA808 series hybrid cable hanger, single run, kit of 10

Material ID 860567171, © CommScope, Inc., Proprietary Page 24 of 28


Rev B, V.01, February 2014 All Rights Reserved
14. Connect the DC power
ower and fiber to the enclosure box.将光纤装入光纤盒

Material ID 860567171, © CommScope, Inc., Proprietary Page 25 of 28


Rev B, V.01, February 2014 All Rights Reserved
15. Excess cable management 多余馈线处理

The cable can be breakout if require


require的, please refer to the Commscope instruction. 如果需
要进行电缆破开,请参阅康普的作业指导
请参阅康普的作业指导。

Material ID 860567171, © CommScope, Inc., Proprietary Page 26 of 28


Rev B, V.01, February 2014 All Rights Reserved
16. Fiber connection at the BBU cabinet.

Through the cable into the BBU cabinet carefully, make sure do not damage the cable. 通过电缆
进入BBU机柜小心,确保不要损坏电缆 确保不要损坏电缆。

Install the patch panel into the BBU cabinet, terminate the fiber to the patch panel follow the
number label 1-8 8 at the fiber connectors
connectors. Terminate the DC conductor to the DC unit.
unit.安装配
线架到 BBU 柜, 按照光纤连接器标签 1-8 连接到光纤配线架。连接直流导线到直流供电单元 连接直流导线到直流供电单元
上。

Material ID 860567171, © CommScope, Inc., Proprietary Page 27 of 28


Rev B, V.01, February 2014 All Rights Reserved
Specifications of the fiber cable光纤混合缆参数

END