Etihad Rail 2F1 O & M Depot Project | Overview | 1


Overview KEY INFORMATION
Item Details

Project Name Contract D0201 | Pck. 2F1 | D&B of Rail O&M Facility / Depot

Description Design, build, with options for maintenance of the facilities of main depot at Al Faya

Purpose Light and heavy maintenance of Etihad Rail network fleet of rolling stock

Location Al Faya, Abu Dhabi, 20 mins drive towards Sewihan from Abu Dhabi airport

Design Contractor Design, construction, installation, testing and commissioning

Client Etihad Rail Company PJSC (Etihad Rail)

D&B Contractor 55% Vinci / 45% BICC-Leighton Contracting

Project Design Team egis (PMC), Jacobs (Eng.), interfaces: Pck. 2B China Rail / Ghantoot JV | Pck. 2S Hitachi

Contract type Fixed Price Lump Sum, with milestone payments

Duration 1,184 days with milestones

Commencement date 5 January 2020

Etihad Rail 2F1 O & M Depot Project | Overview | 2


Overview TEAMS

EMPLOYER

PMC THE ENGINEER

D&B CONTRACTOR

LEAD DESIGNER
ENGINEERING

ARCHITECT ARCHITECT, RAILWAY/SYSTEM SAND MITIGATION ENVIRONMENTAL


ENGINEER OF ASSURANCE AND WASTE
RECORD MANAGEMENT

Etihad Rail 2F1 O & M Depot Project | Overview | 3


Overview CLIENT - ETIHAD RAIL

▪ Etihad Rail, UAE rail construction authority


▪ To build 1,200 km passenger & freight rail network for the UAE, and connect to KSA, Oman
▪ Chairman HH Sheikh Theyab bin Mohamed bin Zayed Al Nahyan
▪ Stage 1 AED 3.6 bil. 264 km freight line awarded 2011. Now complete and operating.
▪ Stage 2 Pck. A AED 1.5 bil. awarded March 2018, Pck. B & C AED 4.4 bil. awarded June 2019
▪ Ongoing tenders: Package D (mainline), F2 (freight)
▪ Current or forthcoming tenders: rolling stock, systems
▪ To come (after 2020): Stage 3 - under client design

Etihad Rail 2F1 O & M Depot Project | Overview | 4


Overview LOCATION

Oman

Dubai

Qatar

Abu Dhabi Al Faya Depot

Ruwais

Stage 1

Saudi UAE Oman

Etihad Rail 2F1 O & M Depot Project | Overview | 5


Technical AL FAYA LOCATION

Abu Dhabi Dubai

Airport

Khalifa City B
Sweihan Road

Roundabout

Google Maps Driving times:


Riyad City North - 29 mins from Leighton office
- 43 mins from Vinci office Paved, dual rd.
- 36 mins from Etihad Rail
- 34 mins from Jacobs Mussafah
- 58 mins from Jebel Ali
- 75 mins from BICC HQ

Substation Al Faya Depot Plot

Etihad Rail 2F1 O & M Depot Project | Overview | 6


Design PROJECT LAYOUT

Interfacing 2B Contractor Track


Train Wash Gate House
3
10 3 Provisioning Building 9
12
5
Hazmat P-Way Yard Waste Facility
Provisioning 4 Store Switches
Building
1
Substation 13 Intake Administration Building
Maintenance 7 Substation
P-way Building 8
Truck park
Maintenance Building
Helipad
Mech 15
6 14
14 plant 15
11 Yellow Plant Facility
Substation
2 Administration Building

BUILDINGS OTHER Key Interfaces

1. Administration Building 7. Mechanical Plant 13. P-Way Yard • 2B Mainline (China State)
2. Maintenance Building 8. Intake Substation 14. Truck Parking • 2S Systems (Hitachi)
3. Provisioning Building 9. Gate House 15. Helipad
4. Hazmat Store 10. Train Wash Facility 16. 2F1 Track
5. Distribution Substation 11. Yellow Plant Facility
6. Maintenance Substation 12. Waste Management Facility

Dead end Interfacing 2B Contractor Track Reception and departure


In and out Berthing In and out
cripple lane

Reception and departure


Future Berthing
Dead end cripple lane

Provisioning Building Train Wash Provisioning Building

Paint,
Paint blast
& blasting
Yellow plant
Yellow plant Dead end cripple lane
Paint,
Wagon blast
light maintenance
Storage P-way Paint, blast
Wagon heavy maintenance
Paint,
Bogie blast
workshop
Paint, blast
Loco light maintenance
Locos - heavy
Loco heavy maintenance

Etihad Rail 2F1 O & M Depot Project | Overview | 7


Design DEVELOPED BUILDING RENDERS

Administration Building

Main Maintenance workshop

Carpark viewed from


Administration Building

Etihad Rail 2F1 O & M Depot Project | Overview | 8


Technical PLANNED PROCUREMENT

Subcontract Packages Supply

▪ Earthworks ▪ Rail, rail fasteners, switches and crossings


▪ Structures & buildings ▪ Ballast, sleepers, concrete, reinforcement
▪ Specialist equipment, lifting jacks, gantry cranes
▪ Trackworks
▪ Wagon shop cranes, slings, straps and chains
▪ Power & other utilities
▪ Air extractors, lathes, axle crack detector
▪ Building MEP ▪ Wagon lifting spreader beam, wheel balancer
▪ Bogie assembling bench, trailer for forklift
▪ Stub seat and bore lathe
▪ Bearing on/off press, coupler crack detection
▪ Paint and blast shop, workshop jacks, crane, stands
▪ Loco battery charger, hydraulic fluid cycling/filtration trolley
▪ Coolant recovery system, workshop access staging
▪ Loco roof access platform
▪ Workshop painting facility, air extraction system
▪ Depot protection system
▪ Fuel, sand, fluid dispensers and storage
▪ Mobile hydraulic jacking and slewing equipment
▪ Forklifts, tag readers and LAN connection
▪ Fall-arrest systems, lifting jacks, gantry cranes
▪ Wheel-set storage

Etihad Rail 2F1 O & M Depot Project | Overview | 9


Technical SUMMARY PROGRAM

Etihad Rail 2F1 O & M Depot Project | Overview | 10