FABRICATED PIPING SYSTEMS.

SAFE WORK PROCEDURE / PLANNED JOB OBSERVATION

SAFE WORK PROCEDURES PLANNED JOB


OBSERVATIONS
Steps Critical Points Comments on No
(In sequence) (Items to be emphasised) Deviations from
Standards
Inspection of equipment and protective equipment. All equipment and P.P.E to be visually inspected daily.
Workers will at all time have & use the required P.P.E. (dust
The correct P.P.E must be worn by workers doing the
mask, hard hat, safety glasses, safety shoes with spats,
painting.
reflective overall, safety pvc gloves) for the job at hand.
Ensure all danger regarding specific substances/product has
been communicated to workers and they have signed
acknowledgement that they understand. (Refer to M.S.D.S).
Workers will at all time have & use the required P.P.E. (dust
Handling painting material and equipment mask, hard hat, safety glasses, safety shoes with spats,
reflective overall, safety pvc gloves) for the job at hand. A
hazardous substance store will be made available according
to specification of the law. Right tools will be used for the job
at hand, a flat screwdriver will be used to open paint tins.
Ensure all danger regarding specific substances/product have
been communicated to workers and they have signed
acknowledgement that they understand.( Refer to M.S.D.S)
Painter must ensure that paint tin/ container are secured in
Painting to commence. elevated areas at all times. Paint brush must be secured at all
times by means of a wrist lanyard. Area below the painting
area must be barricade and no entry signs must be displayed.
Area below where painting task should be conducted must be
covered with plastic to avoid dripping all over.
Completion of task. All materials must be removed from site on completion of
task. And housekeeping to be on an ongoing basis. PVC
Gloves must be worn when cleaning the paint brushes and
the paint brushes must cleaned with thinners inside the bund
wall at the paint store to ensure spills are not contaminating
FABRICATED PIPING SYSTEMS.

the ground.
Paint and thinners must be kept inside store if not in use.
FABRICATED PIPING SYSTEMS.

Method Statement
Company: F.P.S
Date: 22/03/2010
Task / Job: FPS 018 – Painting
Supervisor: All supervisors

Method statement

1. Inspection of equipment and protective equipment.


2. Obtain correct P.P.E to be worn by workers doing the painting.
3. Handling painting material and equipment.
4. Painting to commence.
5. Completion of task.