Annex IV

Testing and Commissioning Progress Chart for Low Voltage Cubicle Switchboard Installation ( Rev. ) (1)
Dates (2) Remark

Reference to
Approved T&C
Activities S A S A S A S A S A S A S A S A
Procedure
Annex III
2.7 Temperature-rise limit test 3.2.1.7 & 3.2.3
Submission of Record of Test

2.8 Functional Test 3.2.1.8 & 3.2.3


Submission of Record of Test
3. Site tests after connection of
incoming supply

3.1 Voltage test 3.2.2.1 & 3.2.3


Submission of Record of Test

3.2 Phase sequence test 3.2.2.3 & 3.2.3


Submission of Record of Test

3.3 Functional test for digital 4.2.3


power meter/power analyzer
Submission of Record of Test

4. Submission of T&C
Certificate

(1) Insert no.


(2) Insert additional columns as necessary
S - schedule % completion
A - actual % completion

Signature - Post :
Tested / Checked by :
(Name of Contractor’s Representative) Tel. No. :
( ) Date :
Signature - Post :
Witnessed by :
(Name(s) of *PBSE/PBSI) Tel. No. :
( ) Date :

Architectural Services Department Annex IV Issue Date: 17 Dec 2007


BSB– Standard Form No:PBS/SR.026(2007) Page 2 of 2 Revision Date: -
EE_TCP (2007 Edition)