Equipment Required
2. System VI Box
3. 335230 Calibration Box
4. Multimeter
5. 8144, 9144, or 9057 Logging Tool
Procedure
1. Turn on System VI tool power and let tool warm up for 20 minutes.
1
22. Enter the maximum SPR value written on the side of the calibration box in the
OHM-M section of point two of the RES calibration.
23. Enter the RES CPS value in the CPS section of point two of the RES calibration.
24. Select Save Cal from the calibration curves menu.