DESIGN SUMMARY

for
Construction of TWO (2) – STOREY ISOLATION BUILDING
FOR EMERGING/RE-EMERGING INFECTIOUS DISEASES
@ DRSTMH Compound, Kalibo, Aklan

Design Stresses:
fc’ =20.7 MPa for concrete
fy = 276 MPa for 16mm φ & larger rebars
fy = 228 MPa for smaller than 16 mm φ rebars

Dead Loads:
Unit Weight of Concrete 24kN/m3
Walls
4” CHB 2.98kN/m
6” CHB 3.11kN/m
Floor Finishes 1.10kPa
Ceiling Finishes 0.15kPa
MEP 0.10kPa
Extra Movable Load 1.00kPa

Live Loads:
Hospital Wards & Rooms 1.9kPa
Laboratories & Operating Rooms 2.9kPa
Corridors above ground floor 3.8kPa

1. ROOF DECK

 2-WAY SLAB: Thickness = 125mm


Rebars: Use 12 mm φ, S = 150mm

 MAIN BEAM : 300 mm x 600 mm, Span L = 7000mm/6000mm/3000mm/1550mm


Rebars @ Support
use 8-20 mm φ top bars
use 5-20 mm φ bottom bars
Rebars @ Midspan
use 5-20 mm φ top bars
use 8-20 mm φ bottom bars
Use 10 mm φ stirrups, place 1st stirrup @ 50mm from the face of the support
For L = 7000mm Span, stirrups spaced: 5 @ 50mm, 7 @ 100mm, 9 @ 150mm, rest @ 200mm O.C.
For L = 6000mm Span, stirrups spaced: 4 @ 50mm, 6 @ 100mm, 8 @ 150mm, rest @ 200mm O.C.
For L = 3000 Span, stirrups spaced: 2 @ 50mm, 4 @ 100mm, 6 @ 150mm, rest @ 200mm O.C.
For L = 1550 Span, stirrups spaced: 2 @ 50mm, 4 @ 100mm, 6 @ 150mm, rest @ 200mm O.C.

 SECONDARY BEAMS : 250 mm x 500 mm, Span L = 7000mm/3000mm


Rebars @ Support
use 6-20 mm φ top bars
use 4-20 mm φ bottom bars

October 30, 2020 1


Rebars @ Midspan
use 4-20 mm φ top bars
use 4-20 mm φ bottom bars
Use 10 mm φ stirrups, place 1st stirrup @ 50mm from the face of the support
For L = 7000mm Span, stirrups spaced: 5 @ 50mm, 7 @ 100mm, 9 @ 150mm, rest @ 200mm O.C.
For L = 3000mm Span stirrups spaced: 2 @ 50mm, 4 @ 100mm, 6 @ 150mm, rest @ 200mm O.C.

 TERIARY BEAMS : 250 mm x 600 mm, Span L = 3000mm/1550mm


Rebars @ Support
use 5-20 mm φ top bars
use 3-20 mm φ bottom bars
Rebars @ Midspan
use 3-20 mm φ top bars
use 3-20 mm φ bottom bars
Use 10 mm φ stirrups, place 1st stirrup @ 50mm from the face of the support
For L = 3000 Span, stirrups spaced: 2 @ 50mm, 4 @ 100mm, 6 @ 150mm, rest @ 200mm O.C.
For L = 1550 Span, stirrups spaced: 2 @ 50mm, 4 @ 100mm, 6 @ 150mm, rest @ 200mm O.C.

 LINTEL BEAMS : 150 mm x 300 mm


Rebars
use 2-16 mm φ top bars
use 2-16 mm φ bottom bars
Use 10 mm φ stirrups, place 1st stirrup @ 50mm from the face of the support
spaced: 2 @ 50mm, 4 @ 100mm, 6 @ 150mm, rest @ 200mm O.C.

2. SECOND FLOOR

 2-WAY SLAB: Thickness = 125mm


Rebars: Use 12 mm φ, S ≤ 250mm

 MAIN BEAM : 300 mm x 600 mm, Span L = 7000mm/6000mm/3000mm/1550mm


Rebars @ Support
use 8-20 mm φ top bars
use 5-20 mm φ bottom bars
Rebars @ Midspan
use 5-20 mm φ top bars
use 8-20 mm φ bottom bars
Use 10 mm φ stirrups, place 1st stirrup @ 50mm from the face of the support
For L = 7000mm Span, stirrups spaced: 5 @ 50mm, 7 @ 100mm, 9 @ 150mm, rest @ 200mm O.C.
For L = 6000mm Span, stirrups spaced: 4 @ 50mm, 6 @ 100mm, 8 @ 150mm, rest @ 200mm O.C.
For L = 3000 Span, stirrups spaced: 2 @ 50mm, 4 @ 100mm, 6 @ 150mm, rest @ 200mm O.C.
For L = 1550 Span, stirrups spaced: 2 @ 50mm, 4 @ 100mm, 6 @ 150mm, rest @ 200mm O.C.

 SECONDARY BEAMS : 250 mm x 500 mm, Span L = 7000mm/3000mm


Rebars @ Support
use 6-20 mm φ top bars
use 4-20 mm φ bottom bars
Rebars @ Midspan
use 4-20 mm φ top bars
use 4-20 mm φ bottom bars
Use 10 mm φ stirrups, place 1st stirrup @ 50mm from the face of the support
For L = 7000mm Span, stirrups spaced: 5 @ 50mm, 7 @ 100mm, 9 @ 150mm, rest @ 200mm O.C.
For L = 3000mm Span stirrups spaced: 2 @ 50mm, 4 @ 100mm, 6 @ 150mm, rest @ 200mm O.C.

October 30, 2020 2


 TERIARY BEAMS : 250 mm x 600 mm, Span L = 3000mm/1550mm
Rebars @ Support
use 5-20 mm φ top bars
use 3-20 mm φ bottom bars
Rebars @ Midspan
use 3-20 mm φ top bars
use 3-20 mm φ bottom bars
Use 10 mm φ stirrups, place 1st stirrup @ 50mm from the face of the support
For L = 3000 Span, stirrups spaced: 2 @ 50mm, 4 @ 100mm, 6 @ 150mm, rest @ 200mm O.C.
For L = 1550 Span, stirrups spaced: 2 @ 50mm, 4 @ 100mm, 6 @ 150mm, rest @ 200mm O.C.

 LINTEL BEAMS : 150 mm x 300 mm


Rebars
use 2-16 mm φ top bars
use 2-16 mm φ bottom bars
Use 10 mm φ stirrups, place 1st stirrup @ 50mm from the face of the support
spaced: 2 @ 50mm, 4 @ 100mm, 6 @ 150mm, rest @ 200mm O.C

3. MAIN COLUMN : 400 mm x 600 mm concrete section


use 16-25 mm φ bars
use 10 mm φ lateral ties
spacing of 50mm O.C. @ Core; 150 mm O.C. @ middle 3rd of Col. Ht., & the rest @ 100mm O.C.

LINTEL COLUMN : 150 mm x 400 mm concrete section


use 6-16 mm φ bars
use 10 mm φ lateral ties
spacing of 50mm O.C. @ Core; 150 mm O.C. @ middle 3rd of Col. Ht., & the rest @ 100mm O.C.

4. TIE BEAMS : 250 mm x 500 mm, Span L = 7000mm/6000mm/3000mm


Rebars
use 4-20 mm φ top bars
use 4-20 mm φ bottom bars
Use 10 mm φ stirrups, place 1st stirrup @ 50mm from the face of the support
For L = 7000mm Span, stirrups spaced: 5 @ 50mm, 7 @ 100mm, 9 @ 150mm, rest @ 200mm O.C.
For L = 6000mm Span, stirrups spaced: 4 @ 50mm, 6 @ 100mm, 8 @ 150mm, rest @ 200mm O.C.
For L = 3000 Span, stirrups spaced: 2 @ 50mm, 4 @ 100mm, 6 @ 150mm, rest @ 200mm O.C.
Note: Location of the underside of beam is 1000mm below the N.G.L.

5. ISOLATED CONCRETE FOOTING OF MAIN COLUMN (ASB = 75 kPa)


Thickness = 400mm
Width = 3000 mm
Length = 3000 mm
Top Matting Rebars = 18-16 mm φ rebars o.c.b.w.
Bottom Matting Rebars = 18-20 mm φ rebars o.c.b.w.

October 30, 2020 3