STRAND: RCC BEAM DESIGN PROGRAM


-------------------------------------------------------------------------------
JOB NO.
-------------------------------------------------------------------------------

BEAM NO. : B 1 Width = 200 mm Depth = 400 mm

SINGLY REINF. RECT. SECTION AT MID SPAN LIMIT STATE METHOD


RCC Grade M 20, Main Steel Fy = 415 N/mm2, Stirrup Steel Fy = 415 N/mm2
Eff.Cover to Tensile Reinf.= 35 mm Eff.Cover to Compre. Reinf.= 35 mm

CRITICAL BENDING MOMENTS (T-mt) <Redistribution of Sup. -ve Moments = 0.0%>


Load Left Support Right Support Max +ve Mid Span Abs Max
Comb. -ve Moment -ve Moment Moment -ve Moment Torsion
1 0.00 0.00 0.77 0.00 0.00

CRITICAL SHEAR FORCES (T)


Load Left Support Right Support Abs Min Partial Safety
Comb. Shear Shear Shear Factor
1 1.42 -1.42 0.10 1.50

Reinf. Required Bar Combination Tensile Compr. Area Area-Prov.


At Provided Ast Asc Reqd. cm2 Pt %
MID SPAN BOTTOM 3 Tor 14 1.50 0.00 1.50 4.62 0.63
MID SPAN TOP 2 Tor 14 0.00 0.00 0.00 3.08 0.42

Strps. (Near Supports) Ast = 1.92 cm2/mt (Prov.Tor 8 @ 180 mm C/C 2 Legged)
Strps. (Rest of Beam) Ast = 1.92 cm2/mt (Prov.Tor 8 @ 180 mm C/C 2 Legged)
Min Shear Reinf. Reqd. Ast = 1.92 cm2/mt (Tor 8 @ 270 mm C/C 2 Legged)
Shear Capacity of Section with Minimum Stirrups = 5.75 T

-------------------------------------------------------------------------------

BEAM NO. : B 2 Width = 200 mm Depth = 500 mm

SINGLY REINF. RECT. SECTION AT MID SPAN LIMIT STATE METHOD


RCC Grade M 20, Main Steel Fy = 415 N/mm2, Stirrup Steel Fy = 415 N/mm2
Eff.Cover to Tensile Reinf.= 35 mm Eff.Cover to Compre. Reinf.= 35 mm

CRITICAL BENDING MOMENTS (T-mt) <Redistribution of Sup. -ve Moments = 0.0%>


Load Left Support Right Support Max +ve Mid Span Abs Max
Comb. -ve Moment -ve Moment Moment -ve Moment Torsion
1 -2.08 0.00 2.45 0.00 0.00

CRITICAL SHEAR FORCES (T)


Load Left Support Right Support Abs Min Partial Safety
Comb. Shear Shear Shear Factor
1 3.47 -2.48 0.32 1.50

Reinf. Required Bar Combination Tensile Compr. Area Area-Prov.


At Provided Ast Asc Reqd. cm2 Pt %
MID SPAN BOTTOM 3 Tor 16 2.31 0.00 2.31 6.03 0.65
MID SPAN TOP 2 Tor 16 0.00 0.00 0.00 4.02 0.43
SUP.TOP EXTRA 2 Tor 16 1.94 0.00 0.00 4.02 0.43

Strps. (Near Supports) Ast = 1.92 cm2/mt (Prov.Tor 8 @ 180 mm C/C 2 Legged)
Strps. (Rest of Beam) Ast = 1.92 cm2/mt (Prov.Tor 8 @ 180 mm C/C 2 Legged)
Min Shear Reinf. Reqd. Ast = 1.92 cm2/mt (Tor 8 @ 345 mm C/C 2 Legged)
Shear Capacity of Section with Minimum Stirrups = 6.42 T
BEAM NO. : B 3 Width = 200 mm Depth = 500 mm

SINGLY REINF. RECT. SECTION AT MID SPAN LIMIT STATE METHOD


RCC Grade M 20, Main Steel Fy = 415 N/mm2, Stirrup Steel Fy = 415 N/mm2
Eff.Cover to Tensile Reinf.= 35 mm Eff.Cover to Compre. Reinf.= 35 mm

CRITICAL BENDING MOMENTS (T-mt) <Redistribution of Sup. -ve Moments = 0.0%>


Load Left Support Right Support Max +ve Mid Span Abs Max
Comb. -ve Moment -ve Moment Moment -ve Moment Torsion
1 -1.58 -2.08 0.00 -2.08 0.00

CRITICAL SHEAR FORCES (T)


Load Left Support Right Support Abs Min Partial Safety
Comb. Shear Shear Shear Factor
1 0.75 -1.34 0.03 1.50

Reinf. Required Bar Combination Tensile Compr. Area Area-Prov.


At Provided Ast Asc Reqd. cm2 Pt %
MID SPAN BOTTOM 2 Tor 16 0.00 0.00 0.00 4.02 0.43
MID SPAN TOP 4 Tor 16 1.94 0.00 1.94 8.04 0.86

Strps. (Near Supports) Ast = 1.92 cm2/mt (Prov.Tor 8 @ 180 mm C/C 2 Legged)
Strps. (Rest of Beam) Ast = 1.92 cm2/mt (Prov.Tor 8 @ 180 mm C/C 2 Legged)
Min Shear Reinf. Reqd. Ast = 1.92 cm2/mt (Tor 8 @ 345 mm C/C 2 Legged)
Shear Capacity of Section with Minimum Stirrups = 5.99 T

-------------------------------------------------------------------------------

BEAM NO. : B 4 Width = 300 mm Depth = 500 mm

SINGLY REINF. RECT. SECTION AT MID SPAN LIMIT STATE METHOD


RCC Grade M 20, Main Steel Fy = 415 N/mm2, Stirrup Steel Fy = 415 N/mm2
Eff.Cover to Tensile Reinf.= 35 mm Eff.Cover to Compre. Reinf.= 35 mm

CRITICAL BENDING MOMENTS (T-mt) <Redistribution of Sup. -ve Moments = 0.0%>


Load Left Support Right Support Max +ve Mid Span Abs Max
Comb. -ve Moment -ve Moment Moment -ve Moment Torsion
1 -3.61 0.00 3.68 0.00 0.00

CRITICAL SHEAR FORCES (T)


Load Left Support Right Support Abs Min Partial Safety
Comb. Shear Shear Shear Factor
1 5.09 -3.37 0.59 1.50

Reinf. Required Bar Combination Tensile Compr. Area Area-Prov.


At Provided Ast Asc Reqd. cm2 Pt %
MID SPAN BOTTOM 3 Tor 16 3.47 0.00 3.47 6.03 0.43
MID SPAN TOP 3 Tor 16 0.00 0.00 0.00 6.03 0.43
SUP.TOP EXTRA 2 Tor 16 3.40 0.00 0.00 4.02 0.29

Strps. (Near Supports) Ast = 2.89 cm2/mt (Prov.Tor 8 @ 180 mm C/C 2 Legged)
Strps. (Rest of Beam) Ast = 2.89 cm2/mt (Prov.Tor 8 @ 180 mm C/C 2 Legged)
Min Shear Reinf. Reqd. Ast = 2.89 cm2/mt (Tor 8 @ 345 mm C/C 2 Legged)
Shear Capacity of Section with Minimum Stirrups = 7.35 T
BEAM NO. : B 5 Width = 300 mm Depth = 500 mm

SINGLY REINF. RECT. SECTION AT MID SPAN LIMIT STATE METHOD


RCC Grade M 20, Main Steel Fy = 415 N/mm2, Stirrup Steel Fy = 415 N/mm2
Eff.Cover to Tensile Reinf.= 35 mm Eff.Cover to Compre. Reinf.= 35 mm

CRITICAL BENDING MOMENTS (T-mt) <Redistribution of Sup. -ve Moments = 0.0%>


Load Left Support Right Support Max +ve Mid Span Abs Max
Comb. -ve Moment -ve Moment Moment -ve Moment Torsion
1 -1.95 -3.61 0.00 -3.61 0.00

CRITICAL SHEAR FORCES (T)


Load Left Support Right Support Abs Min Partial Safety
Comb. Shear Shear Shear Factor
1 0.17 -2.12 0.15 1.50

Reinf. Required Bar Combination Tensile Compr. Area Area-Prov.


At Provided Ast Asc Reqd. cm2 Pt %
MID SPAN BOTTOM 3 Tor 16 0.00 0.00 0.00 6.03 0.43
MID SPAN TOP 5 Tor 16 3.40 0.00 3.40 10.05 0.72

Strps. (Near Supports) Ast = 2.89 cm2/mt (Prov.Tor 8 @ 180 mm C/C 2 Legged)
Strps. (Rest of Beam) Ast = 2.89 cm2/mt (Prov.Tor 8 @ 180 mm C/C 2 Legged)
Min Shear Reinf. Reqd. Ast = 2.89 cm2/mt (Tor 8 @ 345 mm C/C 2 Legged)
Shear Capacity of Section with Minimum Stirrups = 7.35 T

-------------------------------------------------------------------------------

BEAM NO. : B 6 Width = 300 mm Depth = 500 mm

SINGLY REINF. RECT. SECTION AT MID SPAN LIMIT STATE METHOD


RCC Grade M 20, Main Steel Fy = 415 N/mm2, Stirrup Steel Fy = 415 N/mm2
Eff.Cover to Tensile Reinf.= 35 mm Eff.Cover to Compre. Reinf.= 35 mm

CRITICAL BENDING MOMENTS (T-mt) <Redistribution of Sup. -ve Moments = 0.0%>


Load Left Support Right Support Max +ve Mid Span Abs Max
Comb. -ve Moment -ve Moment Moment -ve Moment Torsion
1 -5.73 0.00 3.99 0.00 0.00

CRITICAL SHEAR FORCES (T)


Load Left Support Right Support Abs Min Partial Safety
Comb. Shear Shear Shear Factor
1 6.22 -4.19 0.09 1.50

Reinf. Required Bar Combination Tensile Compr. Area Area-Prov.


At Provided Ast Asc Reqd. cm2 Pt %
MID SPAN BOTTOM 3 Tor 16 + 2 Tor 14 Curt 3.78 0.00 3.78 9.11 0.65
MID SPAN TOP 3 Tor 16 0.00 0.00 0.00 6.03 0.43
SUP.TOP EXTRA 2 Tor 16 5.59 0.00 0.00 4.02 0.29

Strps. (Near Supports) Ast = 2.89 cm2/mt (Prov.Tor 8 @ 180 mm C/C 2 Legged)
Strps. (Rest of Beam) Ast = 2.89 cm2/mt (Prov.Tor 8 @ 180 mm C/C 2 Legged)
Min Shear Reinf. Reqd. Ast = 2.89 cm2/mt (Tor 8 @ 345 mm C/C 2 Legged)
Shear Capacity of Section with Minimum Stirrups = 7.35 T
BEAM NO. : B 7 Width = 300 mm Depth = 600 mm

SINGLY REINF. RECT. SECTION AT MID SPAN LIMIT STATE METHOD


RCC Grade M 20, Main Steel Fy = 415 N/mm2, Stirrup Steel Fy = 415 N/mm2
Eff.Cover to Tensile Reinf.= 35 mm Eff.Cover to Compre. Reinf.= 35 mm

CRITICAL BENDING MOMENTS (T-mt) <Redistribution of Sup. -ve Moments = 0.0%>


Load Left Support Right Support Max +ve Mid Span Abs Max
Comb. -ve Moment -ve Moment Moment -ve Moment Torsion
1 0.00 -6.25 6.43 0.00 0.00

CRITICAL SHEAR FORCES (T)


Load Left Support Right Support Abs Min Partial Safety
Comb. Shear Shear Shear Factor
1 4.90 -10.90 0.29 1.50

Reinf. Required Bar Combination Tensile Compr. Area Area-Prov.


At Provided Ast Asc Reqd. cm2 Pt %
MID SPAN BOTTOM 3 Tor 16 + 2 Tor 16 Curt 5.04 0.00 5.04 10.05 0.59
MID SPAN TOP 3 Tor 16 0.00 0.00 0.00 6.03 0.36
SUP.TOP EXTRA 2 Tor 16 4.89 0.00 0.00 4.02 0.24

Strps. (Near Supports) Ast = 4.60 cm2/mt (Prov.Tor 8 @ 140 mm C/C 2 Legged)
Strps. (Rest of Beam) Ast = 2.89 cm2/mt (Prov.Tor 8 @ 140 mm C/C 2 Legged)
Min Shear Reinf. Reqd. Ast = 2.89 cm2/mt (Tor 8 @ 345 mm C/C 2 Legged)
Shear Capacity of Section with Minimum Stirrups = 8.60 T

-------------------------------------------------------------------------------

BEAM NO. : B 8 Width = 300 mm Depth = 600 mm

SINGLY REINF. RECT. SECTION AT MID SPAN LIMIT STATE METHOD


RCC Grade M 20, Main Steel Fy = 415 N/mm2, Stirrup Steel Fy = 415 N/mm2
Eff.Cover to Tensile Reinf.= 35 mm Eff.Cover to Compre. Reinf.= 35 mm

CRITICAL BENDING MOMENTS (T-mt) <Redistribution of Sup. -ve Moments = 0.0%>


Load Left Support Right Support Max +ve Mid Span Abs Max
Comb. -ve Moment -ve Moment Moment -ve Moment Torsion
1 0.00 -8.40 0.00 -8.40 0.00

CRITICAL SHEAR FORCES (T)


Load Left Support Right Support Abs Min Partial Safety
Comb. Shear Shear Shear Factor
1 -7.69 -8.98 7.55 1.50

Reinf. Required Bar Combination Tensile Compr. Area Area-Prov.


At Provided Ast Asc Reqd. cm2 Pt %
MID SPAN BOTTOM 3 Tor 16 0.00 0.00 0.00 6.03 0.36
MID SPAN TOP 5 Tor 16 6.73 0.00 6.73 10.05 0.59

Strps. (Near Supports) Ast = 3.19 cm2/mt (Prov.Tor 8 @ 180 mm C/C 2 Legged)
Strps. (Rest of Beam) Ast = 2.89 cm2/mt (Prov.Tor 8 @ 180 mm C/C 2 Legged)
Min Shear Reinf. Reqd. Ast = 2.89 cm2/mt (Tor 8 @ 345 mm C/C 2 Legged)
Shear Capacity of Section with Minimum Stirrups = 8.60 T
BEAM NO. : B 9 Width = 300 mm Depth = 700 mm

SINGLY REINF. RECT. SECTION AT MID SPAN LIMIT STATE METHOD


RCC Grade M 20, Main Steel Fy = 415 N/mm2, Stirrup Steel Fy = 415 N/mm2
Eff.Cover to Tensile Reinf.= 35 mm Eff.Cover to Compre. Reinf.= 35 mm

CRITICAL BENDING MOMENTS (T-mt) <Redistribution of Sup. -ve Moments = 0.0%>


Load Left Support Right Support Max +ve Mid Span Abs Max
Comb. -ve Moment -ve Moment Moment -ve Moment Torsion
1 -7.95 -3.46 4.07 0.00 0.00

CRITICAL SHEAR FORCES (T)


Load Left Support Right Support Abs Min Partial Safety
Comb. Shear Shear Shear Factor
1 10.21 -5.84 0.68 1.50

Reinf. Required Bar Combination Tensile Compr. Area Area-Prov.


At Provided Ast Asc Reqd. cm2 Pt %
MID SPAN BOTTOM 3 Tor 16 + 2 Tor 16 Curt 4.09 0.00 4.09 10.05 0.50
MID SPAN TOP 3 Tor 16 0.00 0.00 0.00 6.03 0.30
SUP.TOP EXTRA 2 Tor 16 6.34 0.00 0.31 4.02 0.20

Strps. (Near Supports) Ast = 3.13 cm2/mt (Prov.Tor 8 @ 180 mm C/C 2 Legged)
Strps. (Rest of Beam) Ast = 2.89 cm2/mt (Prov.Tor 8 @ 180 mm C/C 2 Legged)
Min Shear Reinf. Reqd. Ast = 2.89 cm2/mt (Tor 8 @ 345 mm C/C 2 Legged)
Shear Capacity of Section with Minimum Stirrups = 9.85 T

-------------------------------------------------------------------------------

BEAM NO. : B 10 Width = 300 mm Depth = 400 mm

SINGLY REINF. RECT. SECTION AT MID SPAN LIMIT STATE METHOD


RCC Grade M 20, Main Steel Fy = 415 N/mm2, Stirrup Steel Fy = 415 N/mm2
Eff.Cover to Tensile Reinf.= 35 mm Eff.Cover to Compre. Reinf.= 35 mm

CRITICAL BENDING MOMENTS (T-mt) <Redistribution of Sup. -ve Moments = 0.0%>


Load Left Support Right Support Max +ve Mid Span Abs Max
Comb. -ve Moment -ve Moment Moment -ve Moment Torsion
1 -2.47 0.00 2.56 0.00 0.00

CRITICAL SHEAR FORCES (T)


Load Left Support Right Support Abs Min Partial Safety
Comb. Shear Shear Shear Factor
1 3.44 -2.26 0.42 1.50

Reinf. Required Bar Combination Tensile Compr. Area Area-Prov.


At Provided Ast Asc Reqd. cm2 Pt %
MID SPAN BOTTOM 3 Tor 18 3.10 0.00 3.10 7.63 0.70
MID SPAN TOP 3 Tor 16 0.00 0.00 0.00 6.03 0.55
SUP.TOP EXTRA 2 Tor 16 2.98 0.00 0.00 4.02 0.37

Strps. (Near Supports) Ast = 2.89 cm2/mt (Prov.Tor 8 @ 180 mm C/C 2 Legged)
Strps. (Rest of Beam) Ast = 2.89 cm2/mt (Prov.Tor 8 @ 180 mm C/C 2 Legged)
Min Shear Reinf. Reqd. Ast = 2.89 cm2/mt (Tor 8 @ 270 mm C/C 2 Legged)
Shear Capacity of Section with Minimum Stirrups = 7.14 T
BEAM NO. : B 11 Width = 300 mm Depth = 400 mm

SINGLY REINF. RECT. SECTION AT MID SPAN LIMIT STATE METHOD


RCC Grade M 20, Main Steel Fy = 415 N/mm2, Stirrup Steel Fy = 415 N/mm2
Eff.Cover to Tensile Reinf.= 35 mm Eff.Cover to Compre. Reinf.= 35 mm

CRITICAL BENDING MOMENTS (T-mt) <Redistribution of Sup. -ve Moments = 0.0%>


Load Left Support Right Support Max +ve Mid Span Abs Max
Comb. -ve Moment -ve Moment Moment -ve Moment Torsion
1 -1.39 -2.47 0.00 -2.47 0.00

CRITICAL SHEAR FORCES (T)


Load Left Support Right Support Abs Min Partial Safety
Comb. Shear Shear Shear Factor
1 0.08 -1.35 0.07 1.50

Reinf. Required Bar Combination Tensile Compr. Area Area-Prov.


At Provided Ast Asc Reqd. cm2 Pt %
MID SPAN BOTTOM 3 Tor 18 0.00 0.00 0.00 7.63 0.70
MID SPAN TOP 5 Tor 16 2.98 0.00 2.98 10.05 0.92

Strps. (Near Supports) Ast = 2.89 cm2/mt (Prov.Tor 8 @ 180 mm C/C 2 Legged)
Strps. (Rest of Beam) Ast = 2.89 cm2/mt (Prov.Tor 8 @ 180 mm C/C 2 Legged)
Min Shear Reinf. Reqd. Ast = 2.89 cm2/mt (Tor 8 @ 270 mm C/C 2 Legged)
Shear Capacity of Section with Minimum Stirrups = 7.14 T

-------------------------------------------------------------------------------