a) 3 months
b) 6 months
c) 1 year
d) 2 years
4. Identify the potential service of Mixed grades of Carbon steel piping in hot
corrosive oil service 232˚C(450˚F) or higher temperature and sulphur content in
the oil greater than 0.5% be weight are
a) Appropriate TML
b) Specific corrosion
c) Localized corrosion
d) All of the above.
a) 2”
b) 3”
c) 4”
d) None of the above
6. An area defined by circle having a diameter not greater than 2” for a line diameter
not exceeding 10”, in which thickness readings may averaged is
a) TML
b) WFMT
c) Test point
d) Average point
a) Piping Inspector
b) Piping Engineer
c) Owner/user
d) None of the above
a) Prior to welding
b) During welding
c) Upon completion of welding
d) All of the above
a) Normalizing
b) Tempering
c) Stress relieving
d) None of the above
Ans: __________________ Ref: 300.2(b), Page 5, ASME B 31.3 570
10. Before starting the inspection, getting permit to work in the vicinity from
a) Operator
b) Piping Engineer
c) Piping Inspector
d) Maintenance Engineer.
12. API 570 applies to piping systems for process fluids such as
14. On-site Hydrocarbons that will slowly vaporize during release such as those
operating below the flash point in which class
a) Class 2
b) Class 1
c) Class 3
d) None of the above.
Ans: __________________ Ref: _6.2.2, API 570__
15. Any welding conducted on piping component is in service must be done
accordance with
a) Principles of B 31.3
b) API 2201
c) API 570
d) ASME b 31.3.
a) Defect
b) Imperfection
c) Discontinuity
d) None of the above
a) 3 years
b) 5 years
c) 10 years
d) None of the above
19. Normalize A 516 pipe material min temperature without impact test
a) Curve A
b) Curve D (see bottom notes)
c) Curve C
d) None of the above.
21. Soil to Air Interface corroded, if significant corrosion is noted, to assesses the
corrosion
a) Creep cracking
b) Fatigue cracking
c) Stress corrosion cracking
d) None of the above.
Ans: __________________ Ref: 5.3.10, API 570
23. You expect a interior opened planer defect, what will you to do
a) Time
b) Date
c) Result of the tests
d) Test instrument identification number or serial no. where applicable.
a) Consequences of failure
b) Likelihood of failure
c) Above “a” or “b”
d) None of the above.
a) Surface notices
b) Endurance limit
c) Inclusions
d) All of the above
29. Location marker which are to appear as radiographic images on the film, shall be
placed on the
a) Part
b) Film
c) Any of the “a” or “b”
d) None of the above.
Ans: __________________ Ref: T- 275, ASME Sec. V
30. Back scatter “B” rejection
31. 3G plate qualified which position he can do over 24” above pipe
Ans: __________________ Ref: QW-461.9, ASME Sec. IX, and Page 151
32. Wire penetrameter where shall it be placed? (Shall be placed on the weld so that
the length of the wire is perpendicular to the length of the weld.)
33. A national standard step tablet or a step wedge calibration film, traceable to
a) Thermography.
b) Holograhpy
c) Chemical analysis
d) None of the above
42. During final four hours of a buried piping test, which was re pressurized to 125
psi, that gauge fell 5 psi,
a) Injection nos.
b) Area beginning 12 inches upstream of the injection nozzle
c) Continuing at least 10 pipe diameters downstream of the injection point
d) “b” and “c” above.
a) Pipe
b) Tube
c) Shell
d) Pressure vessel
a) 120˚F
b) 120˚C
c) 60˚F
d) 60˚C
47. Gate valve should be measured for thickness between the seas, since serious
deterioration may have occurred, because of
a) Turbulence
b) corrosion
c) “a” or “b”
d) None of the above
a) 6 months intrval
b) Yearly
c) 5 years
d) None of the above
a) 5 years interval
b) 6 months
c) Yearly
d) 10 years
Ans: __________________ Ref: 9.2.1, API 570
50. Auxiliary small bore piping is
a) < 2”
b) ≤ 2”
c) >2”
d) None of the above
a) 10%
b) 25%
c) 75%
d) 33%
a) Temperature
b) Material Specification
c) Class
d) Manufacturer
53. Bulge found on insulated line and insulated jacket open up what may be the
cause?
a) Dia increase
b) Corrosion build – up.
c) “a” or “b”
d) None of the above.
a) Owner/User
b) Piping Engineer
c) Supplier
d) Piping Inspector
a) 800˚F
b) 650˚F
c) 1000˚F
d) 1250˚F
58. Majority of unit process piping and selected off site piping is
a) Class – 2
b) Class – 1
c) Class - 3
d) None of the above
a) Pressure test
b) Design
c) Re-rating
d) Alteration
a) Any piping which is extra to the main piping ran can be considered as
auxiliary piping
b) Instrument and Machinery piping, typically small bore secondary piping
that can be isolated from primary piping system
c) Any piping which is less than 1.0 inch NB
d) All of the above.
Ans: __________________ Ref: 3.6 API 570
62. |A section of piping that has all points exposed to an environment of similar
corrosivity and that is of similar design conditions and construction material
a) Piping system
b) Piping spool
c) Piping circuit
d) None of the above.
63. Whenever valves are removed from service and will be returned to service or
refurnished for reuse they should be inspected and tested as per
a) API RP 574
b) API Std 598
c) API 570
d) None of the above
a) Welding technique
b) Groove design
c) F number
d) AWS class for filler
a) Owner / User
b) API Authorized Piping Inspector
c) Piping engineer
d) Repair organization.
68. NDE required for welds during alteration or repair shall be in accordance with
a) ASME B 31.3
b) ASME Sec. IX
c) Owner / user specification
d) code to which the piping was built.
a) 5/8”
b) 1 ¼”
c) 1 ¾”
d) None of the above
a) Hour
b) 2 Hours
c) 4 Hours
d) 8 Hours
a) Tensile test for procedure qualification is passed only if base metal failure
occurs at or above Specified Minimum Tensile Strength (SMTS) of base
metal
b) Tensile test for procedure qualification is passed only if base metal failure
occurs above SMTS of base metal
c) Tensile test for procedure qualification is passed even if weld metal
failure occurs above 95% of SMTS of base metal
d) None of the above.
80. For calculating MAWP of piping circuit which is put in service the wall thickness
used in computations is:
81. When evaluating a radiograph of 2 ¼” thick carbon steel piping, what is the
maximum geometric un sharpness?
a) 0.020
b) 0.030
c) 0.040
d) 0.070
a) Al-Cu
b) Carbon Steel
c) Stainless steel
d) Ni Cr Steel
a) API 510
b) As per API 570
c) As per API 653
d) ASME Sec. VII, Div. 1
84. One type of stress corrosion cracking commonly found in carbon steel
a) Amine
b) Creep
c) Chloride
d) None of the above.