API 570 QUESTIONS

1). Inspection Record system Must have except

a) Service, class, ID Numbers, Inspection Intervals


b) Name of Examiner
c) Results of NDE
d) Total No. of TML’s
2). Notch toughness testing is performed using

e) Brinell Test
f) Impact Test
g) Bend Test
h) Tension Test.

3). SMAW WPS – Which of the following is an essential variable

a. Welding Technique
b. Groove Design
c. F Number
d. AWS Class for Filler #

4) Piping Records shall be maintained by

a. Owner / User
b. Authorized API 570 Inspector
c. Piping Engineer
d. Repair organization

5) NDE required for welds during alteration or repair shall be in accordance with

a. Requirement of Inspector and Piping Engineer


b. Applicable Code / Owner specifications
c. .
d. .

6) Under What circumstances a welder qualifies with production weld instead of a


test coupon?

a) Coupons removed from welders production weld and passes


mechanical testing.
b) Never, welders may not be qualified by this method
c) .
d) .
7) Qualifying a groove weld procedure requires

a) Tension / Bend Test


b) .
c) .
d) .

8) Radiographic testing

a) Wire penetrameter on the weld


b) .
c) .
d) .

9) Repair / Alteration: NDE shall be in accordance with applicable code and

a) B 31.3 Specification
b) Owner / User services
c) ,.
d) .

10) TML on temperature less velocity H. C Line of with sulphur have less TML’s
Because of uniform corrosion or line are constructed with higher alloys materials
not likely eorde.
11) Repair organization shall use welders qualified to

a) ANSI B 31.3 Only


b) B 31,1
c) WPS
d) Current applicable code only.

12) Piping shoes off of support

a) Make long shles


b) Consult with piping engineer to evaluation stress in the pipe
c) .
d) .

13) PQR SMAW plate 5/8” thick what is the max thick weld qualified.

a) 5/8”
b) 1 ¼”
c) 1 ¾”
d) 7/8”.
e)
14) Welder Qualification by

a) RT of initial production weld


b) RT of test coupon
c) UT of production weld\
d) Bend test of coupon.