Request for Proposal

For
Design, Supply, Installation Commissioning Of 33 & 132KV
Transmission Lines For Grid-Connected Spv Plant In Telangana
State At Chennur Mandal And Kothagudem

Refex Energy Limited (‘Purchaser’) requests the EPC Contractors for the most competitive
offer of “Design, Supply, Installation Commissioning Of 33 & 132KV Transmission
Lines For Grid-Connected Spv Plant In Telangana State At Chennur Mandal And
Kothagudem”.
The transmission line will be for 34 MW Solar Grid-connected PV Project divided into two
parcels and evacuation will also be through 2 Different transmission lines.
Refex Energy intends to execute the EPC of Solar PV Grid Connected Solar PV plant and
invites application for the Most competitive price for transmission line with details as
follows:

S. Particulars Site
No. Chennur Kothagudem
1. AC Capacity of Plant 11 MW 23 MW
2. Site coordinates
3. Village Chennur Mandal Garimellapadu (4 Parcel)
4. District Mancherial Bhadradri Kothagudem
5. State Telangana Telangana
6. Substation Details 132/33 kV 132/33 kV TSTRANSCO
TSTRANSCO SS, SS, Chandrugonda (or)
Kistampet, Chennur 220/132/33 kV TRANSCO
SS, Sitarampatnam
7. Distance to connecting 10000 m 20000 m
substation (approx.)
8. Evacuation voltage 33kV 132kV
level As per the TRANSCO As per the TRANSCO
guidelines. guidelines.
Brief scope of Work includes:
1. Design & construction of Transmission line/ cable at required voltage level from plant
take off point to the designated substation
2. Obtaining ROW for the TL/UG cable shall be obtained prior to the construction of the
line from the concerned authorities.
3. Construction of bay at designated substation as per DISCOM/TRANSCO
requirements/procedures.
4. Any re-arrangement/ replacement of substation equipment/ materials, including bay
construction, if required, at the evacuating substation necessary for evacuation of power
from the Plant.
5. Construction of transmission line including Design, route survey, foundation, erection
stringing, commissioning as per TRANSCO/DISCOM procedure from take-off point at
plant end/ substation to the delivery point at the evacuation substation as per Project
Particulars provided above
6. Transmission line drawings and erection plans as per DISCOM/ STU guidelines.
7. GTP and GA drawings for the major equipment of transmission line, design basis &
calculation sheets, and other relevant drawings and documents required for engineering of
all facilities within the periphery to be provided under this contract.
8. In case the power evacuation is planned with overhead transmission line for plant internal
and external evacuation, the design of tower and its accessories shall be as e design shall
be submitted to Employer for approval/ accord.
9. In case the power evacuation is planned with underground cable for plant internal
evacuation, the cable shall be approved by the Employer. However, in case of external
power evacuation, the evacuation plan shall be as per DISCOM’s requirement and the
same shall be submitted to Employer for approval/ accord.
10. The contractor has to do the power evacuation and integration to and with the designated
substation via either overhead transmission line or underground cables at specified grid
voltage with all necessary infrastructure such as protection switchgears and metering
systems as per the requirement of the STU/Employer.
11. The power evacuation system for the plant shall be as per the local DISCOM requirement
and appropriate approval. The contractor shall get the route approval from the Employer
and TSTRANSCO/TSNPDCL as the case may be prior to start of the construction. Any
changes in the route or scheme introduced by DISCOM at any point of the time prior to
commissioning shall be complied without any additional cost to the Employer.
12. The execution will be as per following latest guidelines of respective SEB (State
electricity board) and got approved from SEB/STU before execution. In absence of SEB/
STU guidelines REC (Rural electrification corporation) standards shall be followed.
13. For Safety While working at the substation and for construction of transmission line
Towers and their subsequent maintenance, experienced manpower should be deployed
with appropriate protection Equipments, such as insulating gloves, fall arrestor etc.
14. Construction of Bay at Both Solar PV Plants for Power evacuation at designated voltage
level and at Substation end as required.
15. Construction of suitable structures for termination of transmission line for taking off from
plant end and receipt of lines at Substation end.
16. Other specifications and tems as per the tender documents annexed and will be