Вы находитесь на странице: 1из 11

CRONOGRAMA DE ADQUISICION DE EQUIPOS

PROYECTO: MEJORAMIENTO Y AMPLIACIÓN DE AGUA POTABLE Y SANEAMIENTO EN EL CASERIO DE PUCALLPA, DISTRITO DE CAJAY - PROVINCIA DE HUARI - DEPARTAMENTO DE ANCASH.
FECHA: 08 OCTUBRE - 2020
PRESUPUESTO NOVIEMBRE-2020 DICIEMBRE-2020 ENERO-2021 FEBRERO - 2021
PRECIO
DESCRIPCION UND.
S/. CANT. PRESUP. (S/.) CANT. PARCIAL CANT. PARCIAL CANT. PARCIAL CANT. PARCIAL

ESTACION TOTAL (INCLUYE PRISMAS) he 14.83 33.48 496.50 23.44 347.55 10.04 148.95
HERRAMIENTAS MANUALES %mo 6,544.25 1636.06 0.00 1636.06 1636.06 1636.06
BOMBA / MANOMETRO PARA PRUEBA HIDRAULICA hm 7.46 86.62 646.22 17.32 129.24 34.65 258.49 34.65 258.49
GENERADOR ELECTRICO hm 14.83 96.35 1,428.89 19.27 285.78 38.54 571.56 38.54 571.56
REGLA DE MADERA p2 6.78 139.78 947.73 34.95 236.93 34.95 236.93 34.95 236.93 34.95 236.93
PISON DE MANO hm 1.69 522.02 882.22 34.51 58.32 67.80 114.59 102.86 173.84 316.84 535.47
ALICATE und 3.38 57.29 193.63 11.46 38.73 22.92 77.45 22.92 77.45
MAQUINA DE SOLDAR hm 6.78 88.40 599.33 30.94 209.77 30.94 209.77 26.52 179.80
MOTOSOLDADORA DE 250 A hm 8.90 7.96 70.80 7.96 70.80
VIBRADOR DE CONCRETO 4 HP - 1.50" hm 5.51 29.15 160.62 7.29 40.16 7.29 40.16 7.29 40.16 7.29 40.16
MEZCLADORA DE TROMPO 9 P3 (8 HP) hm 10.59 5.11 54.13 1.52 16.05 1.74 18.46 1.85 19.62
MEZCLADORA DE CONCRETO TROMPO 8HP 9 P3 hm 10.59 32.80 347.37 8.20 86.84 8.20 86.84 8.20 86.84 8.20 86.84
COSTO DIRECTO: S/.2,421.91 S/.2,945.51 S/.3,381.51 S/.3,622.76
GASTOS GENERALES: 16.26% S/.393.90 S/.479.05 S/.549.96 S/.589.20
UTILIDAD: 6.30% S/.152.47 S/.185.44 S/.212.89 S/.228.07
SUB TOTAL: S/.2,968.28 S/.3,609.99 S/.4,144.36 S/.4,440.03
IGV: 18% S/.534.29 S/.649.80 S/.745.99 S/.799.21
TOTAL: S/.3,502.57 S/.4,259.79 S/.4,890.35 S/.5,239.24
CRONOGRAMA DE ADQUISICION DE MATERIALES
PROYECTO: MEJORAMIENTO Y AMPLIACIÓN DE AGUA POTABLE Y SANEAMIENTO EN EL CASERIO DE PUCALLPA, DISTRITO DE CAJAY - PROVINCIA DE HUARI - DEPARTAMENTO DE ANCASH.
FECHA: 08 DE OCTUBRE - 2020
PRESUPUESTO NOVIEMBRE-2020 DICIEMBRE-2020 ENERO-2021 FEBRERO - 2021
PRECIO
DESCRIPCION UND.
S/. CANT. PRESUP. (S/.) CANT. PARCIAL CANT. PARCIAL CANT. PARCIAL CANT. PARCIAL

SEGURIDAD Y SALUD EN OBRA glb 4,860.18 1.00 4,860.18 1.00 4,860.18


FLETE TERRESTRE AGUA POTABLE glb 7,559.32 1.00 7,559.32 1.00 7,559.32
FLETE RURAL AGUA POTABLE glb 16,634.85 1.00 16,634.85 1.00 16,634.85
FLETE TERRESTRE DISPOSICION SANITARIA DE glb 21,508.47 1.00 21,508.47
EXCRETAS 1.00 21,508.47
FLETE RURAL DISPOSICION SANITARIA DE EXCRETAS glb 18,895.52 1.00 18,895.52 1.00 18,895.52 0.00
TRANSPORTE vje 334.75 8.00 2,678.00 8.00 2,678.00
ALAMBRE NEGRO N° 16 kg 3.81 277.64 1,057.79 16.18 61.64 238.26 907.75 23.20 88.40
ALAMBRE NEGRO N° 8 kg 3.81 136.19 518.90 51.88 197.68 72.80 277.38 11.51 43.84
ALAMBRE DE PUAS # 16 m 0.34 221.47 75.30 221.47 75.30 0.00
ANGULO 2"x2"x3/16" und 2.88 186.00 535.68 0.00 186.00 535.68
ACERO CORRUGADO fy = 4200 kg/cm2 GRADO 60 kg 4.24 1,217.06 5,160.33 1,006.88 4,269.17 210.18 891.16 0.00 0.00
ACERO CORRUGADO fy = 4200 kg/cm2 kg 2.71 4,951.11 13,417.50 288.49 781.82 4,248.88 11,514.45 413.74 1,121.23 0.00
PERFIL ANGULAR DE 1 1/2"x1 1/2"x3/16" m 6.78 295.61 2,004.24 288.23 1,954.20 7.38 50.04 0.00
PERFIL EN "U" ALUMINIO, L=0.90m und 8.47 7.00 59.29 3.00 25.41 4.00 33.88 0.00
FIERRO CORR. 1" var 38.56 0.64 24.54 0.64 24.54 0.00
CLAVOS PARA MADERA C/C 3" kg 3.81 162.94 620.79 46.44 176.94 91.05 346.88 25.45 96.97 0.00
CLAVOS PARA MADERA C/C 4" kg 3.23 31.33 101.18 0.00 31.33 101.18
CLAVOS PARA CALAMINA kg 3.81 8.79 33.48 8.79 33.48 0.00
CALAMINA GALVANIZADA DE 1.80m x 0.83m x 0.3mm pln 25.42 2.59 65.89 2.59 65.89 0.00
CLAVOS CON CABEZA DE 2 1/2", 3", 4" kg 3.23 35.34 114.14 35.34 114.14 0.00 0.00
CALAMINA GALVANIZADA DE 1.80m x 0.83m x 0.22mm pln 11.85 229.15 2,715.45 229.15 2,715.45 0.00
CLAVOS PARA MADERA C/C 3/4" kg 3.23 30.51 98.55 0.00 30.51 98.55
CANDADO DE SEGURIDAD pza 50.00 4.00 200.00 3.00 150.00 1.00 50.00 0.00
PLATINA 1/4" X 1" und 2.54 94.00 238.76 94.00 238.76 0.00
PLATINA DE 3/8" und 0.85 47.73 40.57 47.73 40.57 0.00
ABRAZADERA DE 1" und 13.56 21.00 284.76 21.00 284.76 0.00 0.00
ABRAZADERA CON PLATINA 3/16" und 6.86 141.00 967.26 141.00 967.26 0.00
ABRAZADERA DE 3/4" und 11.02 10.00 110.20 10.00 110.20 0.00 0.00
ABRAZADERA DE PLATINA GALVANIZADA 2" und 6.99 2.48 17.34 0.00 2.48 17.34
TUBERIA PVC SP NTP 399.002 C-10 DE 1" m 2.97 1,554.80 4,617.76 4.10 12.18 1,548.60 4,599.34 2.10 6.24
TUBERIA PVC SP NTP 399.002 C-10 DE 2" m 3.81 66.41 253.00 45.80 174.50 18.40 70.10 2.20 8.40
TUBERIA PVC SP NTP 399.002 C-10 DE 1 1/2" m 3.81 1,459.05 5,558.98 6.35 24.19 1,452.70 5,534.79 0.00
TUBERIA PVC SP NTP 399.002 C-10 DE 3/4" m 2.12 595.10 1,261.61 590.90 1,252.71 4.20 8.90
TUBERIA PVC SP NTP 399.002 C-10 DE 1/2" m 1.15 657.68 756.33 358.05 411.76 62.00 71.30 237.63 273.27 0.00
TUBERIA PVC SAL 2" NTP 399.003 m 3.23 1,134.06 3,663.01 310.70 1,003.55 338.46 1,093.22 343.85 1,110.65 141.05 455.59
TUBERIA PVC SAL 4" NTP 399.003 m 5.03 129.04 649.06 75.22 378.36 15.50 77.97 38.32 192.73
CODO PVC SP 1 1/2" x 90° und 2.97 16.00 47.52 2.00 5.94 14.00 41.58 0.00
CODO PVC SP 1 1/2" x 45° und 2.97 2.00 5.94 2.00 5.94 0.00 0.00
CODO PVC SP 1" x 45° und 2.97 9.00 26.73 9.00 26.73 0.00
CODO PVC SP 1" x 90° und 2.97 5.00 14.85 3.00 8.91 2.00 5.94
CODO PVC SAP 1/2" X 45° und 1.27 62.00 78.74 62.00 78.74 0.00 0.00
CODO PVC SP 1/2" x 90° und 0.93 248.00 230.64 124.00 115.32 124.00 115.32 0.00
CRONOGRAMA DE ADQUISICION DE MATERIALES
PROYECTO: MEJORAMIENTO Y AMPLIACIÓN DE AGUA POTABLE Y SANEAMIENTO EN EL CASERIO DE PUCALLPA, DISTRITO DE CAJAY - PROVINCIA DE HUARI - DEPARTAMENTO DE ANCASH.
FECHA: 08 DE OCTUBRE - 2020
PRESUPUESTO NOVIEMBRE-2020 DICIEMBRE-2020 ENERO-2021 FEBRERO - 2021
PRECIO
DESCRIPCION UND.
S/. CANT. PRESUP. (S/.) CANT. PARCIAL CANT. PARCIAL CANT. PARCIAL CANT. PARCIAL

CODO PVC SAL 2" X 90° und 1.74 310.00 539.40 217.00 377.58 93.00 161.82
CODO PVC SP 2" x 90° und 4.66 22.00 102.52 12.00 55.92 10.00 46.60 0.00
CODO PVC C/R 1" x 90° und 2.97 12.00 35.64 4.00 11.88 8.00 23.76 0.00
CODO PVC C/R 1 1/2" x 90° und 2.97 6.00 17.82 6.00 17.82 0.00 0.00
CODO PVC SP 2" x 45° und 4.66 3.00 13.98 3.00 13.98 0.00 0.00
CODO PVC SP 3/4" x 90° und 2.12 4.00 8.48 0.00 4.00 8.48
CODO PVC SAL 4" X 2" und 6.10 62.00 378.20 31.00 189.10 31.00 189.10
CODO PVC SAL 2" X 45° und 1.74 341.00 593.34 124.00 215.76 0.00 217.00 377.58
TEE PVC SAP 1 1/2" und 3.77 1.00 3.77 1.00 3.77 0.00
TEE PVC SAP 3/4" und 1.27 2.00 2.54 0.00 2.00 2.54
TEE PVC SAP 1" und 2.97 5.00 14.85 4.00 11.88 1.00 2.97
TEE PVC SP 1/2" und 1.86 124.00 230.64 124.00 230.64 0.00 0.00
TEE PVC SAL 4" X 2" und 6.47 31.00 200.57 0.00 31.00 200.57
TEE PVC SAL 2" und 3.95 62.00 244.90 62.00 244.90 0.00 0.00
TEE PVC SAP 2" und 4.66 6.00 27.96 2.00 9.32 4.00 18.64 0.00
TEE PVC SAP 2" und 4.66 3.00 13.98 3.00 13.98 0.00 0.00
TRANSICION PVC UF-SP 2" und 1.44 744.00 1,071.36 0.00 744.00 1,071.36
CURVA DE 1/2" x 90° PVC SAP und 1.27 31.00 39.37 31.00 39.37 0.00 0.00
CURVA DE PVC SEL 3/4" und 0.59 62.00 36.58 62.00 36.58 0.00
ADAPTADOR UPR PVC 1" und 4.66 18.00 83.88 4.00 18.64 12.00 55.92 2.00 9.32
ADAPTADOR UPR PVC 1 1/2" und 6.36 17.00 108.12 7.00 44.52 4.00 25.44 6.00 38.16
ADAPTADOR UPR PVC 2" und 8.05 9.00 72.45 5.00 40.25 4.00 32.20 0.00
ADAPTADOR UPR PVC 3/4" und 3.81 6.00 22.86 2.00 7.62 4.00 15.24
ADAPTADOR UPR PVC 1/2" und 2.84 93.00 264.12 31.00 88.04 62.00 176.08
REDUCCION PVC SP 2" A 1 1/2" und 3.81 1.00 3.81 1.00 3.81 0.00 0.00
REDUCCION PVC 1 1/2" - 1" pza 2.97 2.00 5.94 2.00 5.94 0.00
REDUCCION PVC 1" - 3/4" pza 2.12 5.00 10.60 5.00 10.60 0.00
TUBERIA PVC SEL ELECTRICA D=1/2" m 1.08 191.58 206.91 191.58 206.91 0.00
UNION PVC SP 2" und 6.36 12.00 76.32 8.00 50.88 4.00 25.44 0.00
UNION SOQUET PVC DE 2" und 6.36 8.00 50.88 4.00 25.44 4.00 25.44 0.00
UNION SOQUET PVC DE 1 1/2" und 4.66 3.00 13.98 3.00 13.98 0.00 0.00
UNION PRESION ROSCA PVC 1 1/2" und 7.20 1.00 7.20 1.00 7.20 0.00 0.00
UNION SOQUET PVC DE 1" und 2.97 4.00 11.88 4.00 11.88 0.00
UNION PVC SAP ROSCADO 1/2" pza 1.27 62.00 78.74 62.00 78.74 0.00 0.00
TAPON PVC SP 2" CON PERFORACION DE 3/16" und 6.78 8.00 54.24 4.00 27.12 4.00 27.12 0.00
TAPON PVC SAP 3/4" und 2.12 5.00 10.60 3.00 6.36 2.00 4.24
TAPON PVC SAP 1" und 2.97 1.00 2.97 0.00 1.00 2.97
YEE PVC SAL 2" x 2" und 3.09 186.00 574.74 93.00 287.37 0.00 93.00 287.37
PIEDRA CHANCADA 1/2" m3 86.18 15.45 1,331.76 0.56 47.99 7.27 627.09 7.62 656.68 0.00
PIEDRA CHANCADA DE 3/4" - 1/2" m3 135.59 31.22 4,233.72 9.92 1,345.89 13.11 1,778.15 7.71 1,045.72 0.47 63.96
PIEDRA MEDIANA DE 4" m3 76.27 2.35 179.30 2.35 179.30 0.00 0.00
PIEDRA MEDIANA DE 6" m3 93.22 1.15 106.93 0.74 68.98 0.15 13.80 0.26 24.15 0.00
CRONOGRAMA DE ADQUISICION DE MATERIALES
PROYECTO: MEJORAMIENTO Y AMPLIACIÓN DE AGUA POTABLE Y SANEAMIENTO EN EL CASERIO DE PUCALLPA, DISTRITO DE CAJAY - PROVINCIA DE HUARI - DEPARTAMENTO DE ANCASH.
FECHA: 08 DE OCTUBRE - 2020
PRESUPUESTO NOVIEMBRE-2020 DICIEMBRE-2020 ENERO-2021 FEBRERO - 2021
PRECIO
DESCRIPCION UND.
S/. CANT. PRESUP. (S/.) CANT. PARCIAL CANT. PARCIAL CANT. PARCIAL CANT. PARCIAL

GRAVA 1/2 PULGADA m3 101.69 0.29 29.04 0.08 8.30 0.07 7.32 0.11 10.98 0.02 2.44
GRAVA 3/4 PULGADA m3 101.69 1.28 130.57 1.28 130.57 0.00 0.00
GRAVA 1" PULGADA m3 84.75 1.28 108.82 1.28 108.82 0.00 0.00
GRAVA 2" PULGADA m3 84.75 0.67 56.44 0.67 56.44 0.00 0.00
GRAVA 1 1/2" PULGADA m3 84.75 0.67 56.44 0.67 56.44 0.00 0.00
GRAVA 10.0mm A 40.0mm m3 35.00 20.36 712.49 20.36 712.49 0.00 0.00
GRAVA DE 2 1/2" m3 71.82 48.73 3,499.87 3.48 250.22 45.25 3,249.65 0.00 0.00
GRAVA DE 1" - 2" m3 71.82 45.25 3,249.65 45.25 3,249.65 0.00 0.00
ARENA FINA m3 101.69 27.50 2,796.74 3.94 400.89 17.42 1,772.07 6.13 623.78
ARENA GRUESA m3 101.69 65.87 6,697.92 22.84 2,322.56 28.67 2,915.25 13.90 1,413.05 0.46 47.06
HORMIGON m3 59.32 45.89 2,721.98 45.83 2,718.65 0.06 3.33 0.00 0.00
MATERIAL PROPIO ZARANDEADO m3 21.19 732.18 15,514.95 32.44 687.37 44.64 945.92 455.37 9,649.42 199.73 4,232.24
GEOMEMBRANA HDPE e=1" m2 7.18 301.65 2,165.88 301.65 2,165.88 0.00 0.00
MALLA DE ALAMBRE GALV. #10 2" X 2" DOBLE TORSION m2 8.05 151.41 1,218.85 147.63 1,188.42 3.78 30.43 0.00
MALLA DE SIMPLE TORSION GALVANIZADO #10 m2 2.15 344.37 740.40 344.37 740.40 0.00 0.00
TECNOPOR DE 1"X4"X8" m2 3.30 3.59 11.84 3.59 11.84 0.00
WATER STOP PVC DE 6" m 5.51 12.60 69.43 12.60 69.43 0.00
CODO DE FIERRO GALVANIZADO 1 1/2" X 90° und 6.36 2.00 12.72 2.00 12.72 0.00 0.00
CODO DE FIERRO GALVANIZADO 1 1/2" X 45° und 6.36 2.00 12.72 2.00 12.72 0.00 0.00
CODO DE FIERRO GALVANIZADO 2" X 90° und 8.05 2.00 16.10 2.00 16.10 0.00 0.00
CODO DE FIERRO GALVANIZADO 2" X 90° CON MALLA und 8.05 5.00 40.25 1.00 4.00
SOLDADA 8.05 32.20 0.00
CODO DE FIERRO GALVANIZADO 2" X 45° und 8.05 1.00 8.05 1.00 8.05 0.00 0.00
UNION UNIVERSAL CON ROSCA PVC DE 1" und 5.51 22.00 121.22 4.00 22.04 16.00 88.16 2.00 11.02
UNION UNIVERSAL CON ROSCA PVC DE 1 1/2" und 7.20 12.00 86.40 8.00 57.60 4.00 28.80 0.00
UNION UNIVERSAL CON ROSCA PVC DE 2" und 10.17 8.00 81.36 8.00 81.36 0.00
UNION UNIVERSAL CON ROSCA PVC DE 3/4" und 2.97 6.00 17.82 2.00 5.94 4.00 11.88
UNION UNIVERSAL CON ROSCA PVC DE 1/2" und 4.66 62.00 288.92 62.00 288.92 0.00 0.00
CEMENTO PORTLAND TIPO I (42.5 kg) bol 20.76 1,287.81 26,734.95 454.86 9,442.83 435.60 9,043.04 284.09 5,897.69 113.27 2,351.39
HIPOCLORITO DE SODIO AL 0.1% gal 3.56 50.00 178.00 50.00 178.00 0.00 0.00 0.00 0.00 0.00
HIPOCLORITO DE CALCIO AL 70% kg 10.17 17.02 173.11 1.24 12.61 15.34 156.07 0.44 4.43
YESO DE 20 kg bol 3.56 8.00 28.48 8.00 28.48 0.00 0.00 0.00 0.00 0.00
YESO EN BOLSAS DE 25 KG bol 10.17 73.28 745.28 40.06 407.45 33.22 337.83 0.00 0.00
FRAGUA kg 6.27 18.43 115.57 0.00 18.43 115.57
CODO 90° F°G° 2" CON MALLA SOLDADA, NTP 49:1997 und 8.47 4.00 33.88 4.00 33.88 0.00 0.00
UNION UNIVERSAL PVC DE 1/2" pza 5.67 124.00 703.08 124.00 703.08 0.00
TAPON HEMBRA PVC D=2" SAP CON PERFORACION 3/16" und 4.66 1.00 4.66 1.00 0.00
4.66 0.00
LADRILLO PANDERETA DE ARCILLA 9X12X24 cm und 0.86 16,513.14 14,201.30 15,652.14 13,460.84 861.00 740.46 0.00 0.00
LADRILLO ARCILLA CORRIENTE 8x13x23 CM und 59.24 31.00 1,836.44 0.00 31.00 1,836.44
CONCRETO F'C=175 kg/cm2, S/MEZCLADORA m3 434.81 22.94 9,974.54 16.12 7,009.14 6.82 2,965.40 0.00 0.00
CONCRETO F'C=100 kg/cm2, e=4", S/MEZCLADORA m2 31.51 36.27 1,142.86 18.91 595.85 17.36 547.01 0.00 0.00
CRONOGRAMA DE ADQUISICION DE MATERIALES
PROYECTO: MEJORAMIENTO Y AMPLIACIÓN DE AGUA POTABLE Y SANEAMIENTO EN EL CASERIO DE PUCALLPA, DISTRITO DE CAJAY - PROVINCIA DE HUARI - DEPARTAMENTO DE ANCASH.
FECHA: 08 DE OCTUBRE - 2020
PRESUPUESTO NOVIEMBRE-2020 DICIEMBRE-2020 ENERO-2021 FEBRERO - 2021
PRECIO
DESCRIPCION UND.
S/. CANT. PRESUP. (S/.) CANT. PARCIAL CANT. PARCIAL CANT. PARCIAL CANT. PARCIAL

TAPA SANITARIA DE ACERO INOXIDABLE 0.80 x 0.80 m und 135.59 12.00 1,627.08 8.00 4.00
e=1/8"/INC. ACCESORIOS 1,084.72 542.36 0.00
TAPA SANITARIA DE ACERO INOXIDABLE 0.60 x 0.60 m und 139.83 19.00 2,656.77
e=1/8"/INC. ACCESORIOS
1.00 15.00 419.49
139.83 2,097.45 3.00
TAPA SANITARIA DE ACERO INOXIDABLE 0.70 x 0.70 m und 148.31 1.00 148.31 1.00 0.00
e=1/8"/INC. ACCESORIOS 148.31 0.00
TAPA TERMOPLASTICA PARA C.D. AGUA POTABLE und 38.98 31.00 1,208.38 31.00 1,208.38 0.00 0.00
TUBERIA HDPE NTP ISO 4427:2008, SDR 13,6, PN 10, m 2.97 71.60 212.65
DN=50mm
37.20 102.17
110.48 34.40
NIPLE C/R DE PVC 1"x4" und 2.12 22.00 46.64 4.00 8.48 16.00 33.92 2.00 4.24
NIPLE C/R DE PVC 1 1/2"x4" und 2.97 12.00 35.64 8.00 23.76 4.00 11.88 0.00
NIPLE C/R DE PVC 2"x4" und 4.66 16.00 74.56 8.00 37.28 8.00 37.28 0.00
NIPLE SP DE PVC 2" und 4.66 4.00 18.64 4.00 18.64 0.00 0.00
NIPLE DE F° GALV. L=0.20m DE 2" CON ROSCA A UN und 13.14 4.00 52.56
LADO ISO - 65 SERIE I
4.00 0.00
52.56 0.00
NIPLE PVC SAP D=2" x 6" C-7.5 und 4.66 1.00 4.66 1.00 4.66 0.00
NIPLE DE FIERRO GALVANIZADO L=0.07m DE 1 1/2", und 11.44 9.00 102.96 9.00 0.00
ROSCADO EN AMBOS LADOS 102.96 0.00
NIPLE DE FIERRO GALVANIZADO L=0.35m DE 1 1/2", und 11.44 2.00 22.88
ROSCADO EN AMBOS LADOS
2.00 0.00
22.88 0.00
NIPLE DE FIERRO GALVANIZADO L=0.10m DE 2", und 13.14 3.00 39.42
ROSCADO EN AMBOS LADOS
3.00 0.00
39.42 0.00
NIPLE DE FIERRO GALVANIZADO L=0.45m DE 2", und 13.14 1.00 13.14 1.00 0.00
ROSCADO EN UN LADO 13.14 0.00
NIPLE DE FIERRO GALVANIZADO L=0.25m DE 2", und 13.14 5.00 65.70
ROSCADO EN UN LADO
1.00 4.00
13.14 52.56 0.00
NIPLE C/R DE PVC 2"x2" und 4.66 4.00 18.64 4.00 18.64 0.00
NIPLE C/R DE PVC 3/4"x4" und 1.69 6.00 10.14 2.00 3.38 4.00 6.76
NIPLE PVC SAP 1/2"x2" und 10.17 31.00 315.27 31.00 315.27 0.00 0.00
NIPLE C/R DE PVC 3/4"x3/4" und 1.27 124.00 157.48 124.00 157.48 0.00
PEGAMENTO PARA PVC gal 72.03 139.79 10,069.27 1.57 112.99 12.91 930.12 12.57 905.49 112.74 8,120.67
EPOXICO POLIEPOX ANCLAJE "31" kg 48.73 1.25 60.91 1.25 60.91 0.00
PELDAÑO DE POLIPROPILENO und 21.61 5.00 108.05 5.00 108.05 0.00
SELLADOR ELASTOMERICO gal 201.06 5.02 1,009.60 5.02 1,009.60 0.00
ADITIVO IMPERMEABILIZANTE gal 42.03 63.28 2,659.54 21.28 894.56 20.18 847.93 21.82 917.05
ANDAMIO DE MADERA p2 6.99 479.47 3,351.50 216.15 1,510.88 72.84 509.17 190.48 1,331.45 0.00
ENCOFRADO Y DESENCOFRADO NORMAL m2 51.35 121.83 6,255.97 121.83 6,255.97 0.00 0.00 0.00
MADERA TORNILLO p2 4.67 680.21 3,176.57 0.00 680.21 3,176.57
MADERA PARA ENCOFRADO p2 5.51 3,097.43 17,066.84 749.91 4,132.02 1,959.27 10,795.57 388.25 2,139.25 0.00
ESTACAS DE MADERA und 0.93 749.95 697.45 343.83 319.76 406.12 377.69 0.00 0.00
ESTACA DE MADERA p2 0.93 7.07 6.57 7.07 6.57 0.00 0.00
PUERTA METALICA 1.00m x 1.95m DE ACUERDO A und 296.61 3.00 889.83 3.00 0.00
DISEÑO 889.83 0.00
PUERTA METALICA 0.85m x 1.20m DOS HOJAS DE und 271.19 1.00 271.19
ACUERDO A DISEÑO
1.00
271.19 0.00
PUERTA METALICA 0.70m x 2.40m glb 251.36 31.00 7,792.16 0.00 31.00 7,792.16
CRONOGRAMA DE ADQUISICION DE MATERIALES
PROYECTO: MEJORAMIENTO Y AMPLIACIÓN DE AGUA POTABLE Y SANEAMIENTO EN EL CASERIO DE PUCALLPA, DISTRITO DE CAJAY - PROVINCIA DE HUARI - DEPARTAMENTO DE ANCASH.
FECHA: 08 DE OCTUBRE - 2020
PRESUPUESTO NOVIEMBRE-2020 DICIEMBRE-2020 ENERO-2021 FEBRERO - 2021
PRECIO
DESCRIPCION UND.
S/. CANT. PRESUP. (S/.) CANT. PARCIAL CANT. PARCIAL CANT. PARCIAL CANT. PARCIAL

LIJA DE FIERRO N° 80 plg 1.69 105.40 178.13 36.11 61.03 17.98 30.38 51.31 86.72
PINTURA LATEX gal 27.12 6.79 184.04 1.46 39.49 3.84 103.96 1.50 40.59
PINTURA LATEX ROCKY PROFESIONAL CELESTE gal 165.00 1.99 327.77 1.99 327.77 0.00
PINTURA ESMALTE gal 15.11 19.56 295.49 0.00 19.56 295.49
ESMALTE SINTETICO gal 25.42 7.91 200.97 7.21 183.23 0.50 12.67 0.20 5.07
PINTURA IMPRIMANTE gal 15.11 6.82 103.00 0.00 6.82 103.00
PINTURA ESMALTE. gal 33.90 7.00 237.30 7.00 237.30 0.00 0.00 0.00 0.00 0.00
PINTURA ANTICORROSIVA gal 27.12 7.75 210.24 6.49 175.93 1.08 29.43 0.18 4.88
THINNER ACRILICO gal 13.56 12.83 173.94 8.37 113.54 3.06 41.44 1.40 18.96
THINNER STANDER gal 18.23 14.34 261.39 0.00 14.34 261.39
IMPRIMANTE gal 19.49 19.99 389.59 4.73 92.23 10.39 202.49 4.87 94.87
CINTA AUTOVULCANIZANTE # 15 pza 3.37 31.00 104.48 31.00 104.48 0.00
CINTA TEFLON und 1.27 147.83 187.74 99.51 126.37 34.52 43.84 13.80 17.53
SUMIDERO DE BRONCE und 4.96 124.00 615.04 31.00 153.76 93.00 461.28
CARRITO DE DILATACION 05 RODILLOS 1" (INCLUYE und 300.00 6.00 1,800.00 6.00
ANCLAJES) 1,800.00 0.00
PERNO 1/2"x2 1/2" pza 8.47 141.00 1,194.27 141.00 1,194.27 0.00
PERNO 1/4"x1" pza 8.47 94.00 796.18 94.00 796.18 0.00
TRAMPA "P" PVC DE LAVATORIO Ø 2" und 8.92 93.00 829.56 31.00 276.52 31.00 276.52 31.00 276.52
TRAMPA "P" PVC DE DUCHA und 11.44 62.00 709.28 31.00 354.64 0.00 31.00 354.64
INODORO ONE PIECE und 135.17 31.00 4,190.27 0.00 31.00 4,190.27
BIODIGESTOR 700 LTS (INCLUYE ACCESORIOS) und 838.14 31.00 25,982.34 31.00 25,982.34 0.00 0.00
TUBERIA F° G° 1" m 9.75 2.80 27.30 2.80 27.30 0.00 0.00
TUBERIA DE F° G° 2"x2.5mm m 16.95 132.00 2,237.41 79.20 1,342.44 42.90 727.16 9.90 167.81 0.00
TUBERIA F° G° 3/4" m 7.20 40.09 288.67 40.09 288.67 0.00
TUBERIA F° G° 1 1/2" m 13.56 17.61 238.73 0.90 12.20 16.71 226.53 0.00
TUBERIA F° G° 2" m 16.95 1.60 27.12 1.60 27.12 0.00 0.00
CODO F° G° DE Ø 1/2" und 1.27 124.00 157.48 124.00 157.48 0.00 0.00
CODO F° GALV. DE 1/2" X 90° und 1.08 31.00 33.48 0.00 31.00 33.48 0.00
TEE DE FIERRO GALVANIZADO DE 1 1/2" und 10.59 2.00 21.18 2.00 21.18 0.00 0.00
TEE DE FIERRO GALVANIZADO DE 1 1/2" und 10.59 1.00 10.59 1.00 10.59 0.00 0.00
UNION UNIVERSAL DE FIERRO GALVANIZADO DE 1" und 6.36 4.00 25.44 4.00 25.44 0.00 0.00
UNION UNIVERSAL DE FIERRO GALVANIZADO DE 2" und 10.17 2.00 20.34 2.00 20.34 0.00 0.00
UNION UNIVERSAL DE FIERRO GALVANIZADO DE 1 1/2" und 12.71 4.00 50.84 4.00 50.84 0.00 0.00
BUSHING DE BRONCE DE 1/2" und 1.80 31.00 55.80 0.00 31.00 55.80 0.00
BRIDA ROMPE AGUA DE FIERRO GALVANIZADO DE 1" und 7.97 8.00 63.76 4.00 31.88 4.00 31.88 0.00
BRIDA ROMPE AGUA DE FIERRO GALVANIZADO DE 2", und 22.03 16.00 352.48 8.00 8.00
NIPLE L=0.20m CON ROSCA A UN LADO 176.24 176.24 0.00
BRIDA ROMPE AGUA DE FIERRO GALVANIZADO DE 1 1/2" und 22.03 3.00 66.09 3.00 0.00
66.09 0.00
VALVULA CORPORATION DE PVC 1/2" und 12.71 31.00 394.01 31.00 394.01 0.00 0.00 0.00
VALVULA DE PASO 1/2" und 5.93 62.00 367.66 62.00 367.66 0.00 0.00 0.00
VALVULA ESFERICA DE BRONCE DE 1" und 25.42 13.00 330.46 4.00 101.68 8.00 203.36 1.00 25.42
CRONOGRAMA DE ADQUISICION DE MATERIALES
PROYECTO: MEJORAMIENTO Y AMPLIACIÓN DE AGUA POTABLE Y SANEAMIENTO EN EL CASERIO DE PUCALLPA, DISTRITO DE CAJAY - PROVINCIA DE HUARI - DEPARTAMENTO DE ANCASH.
FECHA: 08 DE OCTUBRE - 2020
PRESUPUESTO NOVIEMBRE-2020 DICIEMBRE-2020 ENERO-2021 FEBRERO - 2021
PRECIO
DESCRIPCION UND.
S/. CANT. PRESUP. (S/.) CANT. PARCIAL CANT. PARCIAL CANT. PARCIAL CANT. PARCIAL

VALVULA ESFERICA DE BRONCE DE 1 1/2" und 42.37 8.00 338.96 6.00 254.22 2.00 84.74 0.00
VALVULA ESFERICA DE BRONCE DE 2" und 67.80 9.00 610.20 5.00 339.00 4.00 271.20 0.00
VALVULA ESFERICA DE BRONCE DE 3/4" und 21.19 3.00 63.57 0.00 1.00 21.19 2.00 42.38
VALVULA FLOTADORA DE BRONCE 1" und 63.56 6.00 381.36 2.00 127.12 4.00 254.24 0.00
VALVULA FLOTADORA DE BRONCE 1 1/2" und 93.22 4.00 372.88 4.00 372.88 0.00 0.00
VALVULA COMPUERTA DE BRONCE DE 2 1/2" und 4.24 62.00 262.88 0.00 62.00 262.88 0.00
SOLDADURA CELLOCORD 1/8" kg 11.86 32.82 389.26 28.72 340.62 4.10 48.64 0.00
SOLDADURA CELLOCORD 1/8" pza 0.72 31.00 22.32 0.00 31.00 22.32 0.00
SOLDADURA OVERCORD 1/8" kg 3.69 31.00 114.39 0.00 0.00 31.00 114.39
GRIFO PARA RIEGO INC. CAJA Y TAOA F. FDO und 21.19 31.00 656.89 0.00 0.00 31.00 656.89
GRIFO DE BRONCE 1/2" und 12.14 31.00 376.34 0.00 31.00 376.34 0.00
DUCHA CROMADA INC. LLAVE Y ACCESORIOS und 45.91 31.00 1,423.21 0.00 0.00 31.00 1,423.21
CANASTILLA DE BRONCE DE 1" und 10.17 6.00 61.02 2.00 20.34 4.00 40.68 0.00
CONO DE REBOSE PVC DE 4" - 2" und 11.86 2.00 23.72 2.00 23.72 0.00 0.00
CANASTILLA DE BRONCE DE 1 1/2" und 18.05 3.00 54.15 3.00 54.15 0.00 0.00
INTERRUPTOR SIMPLE und 7.04 31.00 218.24 0.00 31.00 218.24 0.00
TEMPLADOR CON DOS ESPIGAS DE OJAL und 7.63 6.00 45.78 0.00 6.00 45.78 0.00
OVEROL DE PROTECCION BIOLOGICA und 57.46 6.00 344.76 6.00 344.76 0.00 0.00 0.00 0.00 0.00 0.00
GAFAS DE PROTECCION und 21.19 20.00 423.80 20.00 423.80 0.00 0.00 0.00 0.00 0.00 0.00
CARTEL DE OBRA 4.80m X 3.60m INCLUYE BANNER und 677.97 1.00 677.97 0.00 0.00
BASTIDORES Y PARANTES 1.00 677.97 0.00
MASCARILLA N95 und 21.19 50.00 1,059.50 50.00 1,059.50 0.00 0.00 0.00 0.00 0.00 0.00
MAMELUCO DE TELA NOTEX und 55.08 4.00 220.32 4.00 220.32 0.00 0.00 0.00 0.00 0.00 0.00
MASCARILLA QUIRURGICA DE 3 PLIEGUES O SIMILARES und 8.47 530.00 4,489.10 0.00 0.00 0.00
530.00 4,489.10 0.00 0.00 0.00
MASCARA DE PROTECCION FACIAL COMPLETAMENTE und 32.20 19.00 611.80 0.00 0.00 0.00
TRANSPARENTE PARA PERSONAL 19.00 611.80 0.00 0.00 0.00
GUANTES DE LATEX DE PROCEDIMIENTOS und 1.86 560.00 1,041.60 560.00 1,041.60 0.00 0.00 0.00 0.00 0.00 0.00
GUANTES DE VINILO/ACRILONITRILO par 1.86 80.00 148.80 80.00 148.80 0.00 0.00 0.00 0.00 0.00 0.00
MANDILON DESCARTABLE und 25.42 30.00 762.60 30.00 762.60 0.00 0.00 0.00 0.00 0.00 0.00
GORRO DE PROTECCION und 1.27 40.00 50.80 40.00 50.80 0.00 0.00 0.00 0.00 0.00 0.00
SEÑALIZACIONES VISUALES und 67.80 10.00 678.00 10.00 678.00 0.00 0.00 0.00 0.00 0.00 0.00
ACONDICIONAMIENTO DE LA ZONA DE CONTROL Y glb 1,803.39 1.00 1,803.39 0.00 0.00
DESINFECCION 1.00 1,803.39 0.00
ACONDICIONAMIENTO DE LA ZONA DE VESTUARIO glb 1,125.42 1.00 1,125.42 1.00 1,125.42 0.00 0.00 0.00
ACONDICIONAMIENTO DEL AMBIENTE TOPICO (ZONA DE glb 1,071.19 1.00 1,071.19
CONTROL PREVIO)
0.00 0.00
1.00 1,071.19 0.00
ZONAS DE DESCARGA Y LIMPIEZA glb 508.47 1.00 508.47 1.00 508.47 0.00 0.00 0.00
ZONAS DE ALMACENAJE glb 508.47 1.00 508.47 1.00 508.47 0.00 0.00 0.00
SEÑALIZACIONES - CON GIGANTOGRAFIAS glb 338.98 1.00 338.98 1.00 338.98 0.00 0.00 0.00 0.00 0.00 0.00
SEÑALIZACION DE DISTANCIAMIENTO MINIMO und 38.14 20.00 762.80 20.00 762.80 0.00 0.00 0.00 0.00 0.00 0.00
PLAN DE EDUCACION SANITARIA glb 2,000.00 1.00 2,000.00 0.00 1.00 2,000.00 0.00
PLAN DE MONITOREO ARQUEOLOGICO glb 9,760.62 1.00 9,760.62 0.00 0.00 1.00 9,760.62
CRONOGRAMA DE ADQUISICION DE MATERIALES
PROYECTO: MEJORAMIENTO Y AMPLIACIÓN DE AGUA POTABLE Y SANEAMIENTO EN EL CASERIO DE PUCALLPA, DISTRITO DE CAJAY - PROVINCIA DE HUARI - DEPARTAMENTO DE ANCASH.
FECHA: 08 DE OCTUBRE - 2020
PRESUPUESTO NOVIEMBRE-2020 DICIEMBRE-2020 ENERO-2021 FEBRERO - 2021
PRECIO
DESCRIPCION UND.
S/. CANT. PRESUP. (S/.) CANT. PARCIAL CANT. PARCIAL CANT. PARCIAL CANT. PARCIAL

CAJA OCTOGONAL GALVANIZADA LIVIANA 100 mm x 100 und 3.19 31.00 98.89 0.00 31.00
mm x 55mm 98.89 0.00
CAJA RECTANGULAR FIERRO GALVANIZADO 100x55x50 und 2.52 31.00 78.12
mm
0.00 31.00
78.12 0.00
CAJA DE PASO PRE-FABRICADA DE 0.50x0.30x0.25m und 15.25 31.00 472.75 0.00 0.00
(INTERIORES) 31.00 472.75 0.00
CABLE DE ACERO TIPO BOA 6x19 DE 1/2" m 6.86 112.35 770.72 0.00 112.35 770.72 0.00
CABLE DE ACERO TIPO BOA 6x19 DE 1/4" m 6.10 51.44 313.78 0.00 51.44 313.78 0.00
CABLE ELECTRICO NYY 1-1 X 2.5 mm2 m 5.00 420.36 2,101.80 0.00 420.36 2,101.80 0.00
MEGAFONO und 127.12 1.00 127.12 1.00 127.12 0.00 0.00 0.00 0.00 0.00 0.00
PLANCHA DE PVC DE 0.84m x 0.70m, e=15mm und 16.95 7.00 118.65 3.00 50.85 4.00 67.80 0.00
BASE ANTICORROSIVA gal 26.97 13.68 369.00 0.71 19.06 0.00 0.00 12.97 349.94
UNION ROSCADA DE FO. GALV. DE 1" und 4.66 4.00 18.64 4.00 18.64 0.00 0.00
UNION DE ROSCA INTERNA DE BRONCE DE 1" und 4.66 6.00 27.96 2.00 9.32 4.00 18.64 0.00
UNION DE ROSCA INTERNA DE BRONCE DE 1 1/2" und 1.27 3.00 3.81 3.00 3.81 0.00 0.00
RIEL METALICO 2"X3"X1/2", L=0.70m und 38.14 6.00 228.84 0.00 6.00 228.84 0.00
UNION ENLACE ROSCA HEMBRA (HDPE 10) 50mm und 26.95 6.00 161.70 0.00 0.00 6.00 161.70
UNION DE FIERRO GALVANIZADO DE 1 1/2" und 12.71 1.00 12.71 1.00 12.71 0.00 0.00
GUARDACABO PARA CABLE DE 1/2"o und 8.90 12.00 106.80 0.00 12.00 106.80 0.00
GRAPA CROSBY 1/2" und 4.92 54.00 265.68 0.00 54.00 265.68 0.00
GRAPA CROSBY 1/4" und 4.92 94.00 462.48 0.00 94.00 462.48 0.00
ALCOHOL DE 70 GRADOS l 18.64 35.00 652.40 35.00 652.40 0.00 0.00 0.00 0.00 0.00 0.00
ALCOHOL EN GEL 380 ML und 12.71 10.00 127.10 10.00 127.10 0.00 0.00 0.00 0.00 0.00 0.00
ALGODON 1000ML und 25.42 5.00 127.10 5.00 127.10 0.00 0.00 0.00 0.00 0.00 0.00
ALCOHOL GEL DESINFECTANTE 380 ML und 18.64 100.00 1,864.00 100.00 1,864.00 0.00 0.00 0.00 0.00 0.00 0.00
ETAPA DE CIERRE DE LA EJECUCION DE OBRA und 530.85 1.00 530.85 0.00 1.00 530.85 0.00 0.00
LAPICEROS cja 21.19 1.00 21.19 1.00 21.19 0.00 0.00 0.00 0.00 0.00 0.00
PLUMON ACRILICO cja 10.59 7.00 74.13 7.00 74.13 0.00 0.00 0.00 0.00 0.00 0.00
PROYECTOR + KITS glb 466.10 1.00 466.10 1.00 466.10 0.00 0.00 0.00 0.00 0.00 0.00
BANDEJA DESINFECTANTE DE CALZADO und 42.37 6.00 254.22 6.00 254.22 0.00 0.00 0.00 0.00 0.00 0.00
BOLSA PARA RECOJO DE BASURA und 0.25 180.00 45.00 180.00 45.00 0.00 0.00 0.00 0.00 0.00 0.00
JABON LIQUIDO DE 250 ML und 11.02 70.00 771.40 70.00 771.40 0.00 0.00 0.00 0.00 0.00 0.00
PAPEL TISSUE (TOALLA ABSORBENTE) und 1.69 200.00 338.00 200.00 338.00 0.00 0.00 0.00 0.00 0.00 0.00
DESINFECTANTE LEJIA gal 16.95 150.00 2,542.50 150.00 2,542.50 0.00 0.00 0.00 0.00 0.00 0.00
DETERGENTE DE 2 KG bol 47.46 25.00 1,186.50 25.00 1,186.50 0.00 0.00 0.00 0.00 0.00 0.00
AGUA m3 4.24 367.51 1,558.23 14.94 63.34 46.09 195.44 287.62 1,219.52 18.85 79.93
PAPEL BOND A4 DE 75 GR mll 11.02 2.00 22.04 2.00 22.04 0.00 0.00 0.00 0.00 0.00 0.00
PAPELOGRAFOS und 0.42 25.00 10.50 25.00 10.50 0.00 0.00 0.00 0.00 0.00 0.00
LETRINA und 2,642.37 3.00 7,927.11 3.00 7,927.11 0.00 0.00
FOLLETOS INFORMATIVOS und 3.81 50.00 190.50 50.00 190.50 0.00 0.00 0.00 0.00 0.00
SUMINISTRO E INST. DE ACCES. DE CLORACION A und 762.71 1.00 762.71
RESERVORIO METALICA (H=3.50 m) - SEGUN DISEÑO 1.00 0.00
762.71
SUMINISTRO E INST. DE ACCESORIOS EN SISTEMA DE und 254.24 1.00 254.24 0.00 1.00
CLORACION METALICA (H=3.50 m) - SEGUN DISEÑO 254.24
CRONOGRAMA DE ADQUISICION DE MATERIALES
PROYECTO: MEJORAMIENTO Y AMPLIACIÓN DE AGUA POTABLE Y SANEAMIENTO EN EL CASERIO DE PUCALLPA, DISTRITO DE CAJAY - PROVINCIA DE HUARI - DEPARTAMENTO DE ANCASH.
FECHA: 08 DE OCTUBRE - 2020
PRESUPUESTO NOVIEMBRE-2020 DICIEMBRE-2020 ENERO-2021 FEBRERO - 2021
PRECIO
DESCRIPCION UND.
S/. CANT. PRESUP. (S/.) CANT. PARCIAL CANT. PARCIAL CANT. PARCIAL CANT. PARCIAL

LINTERNA DE EXAMEN MEDICO und 80.51 1.00 80.51 1.00 80.51 0.00 0.00 0.00 0.00
BAJA LENGUAS und 0.85 80.00 68.00 80.00 68.00 0.00 0.00 0.00 0.00
BATA DESCARTABLE und 12.71 20.00 254.20 20.00 254.20 0.00 0.00 0.00 0.00
AFICHES INFORMATIVOS und 8.47 20.00 169.40 20.00 169.40 0.00 0.00 0.00 0.00
PIZARRA ACRILICA DE 1.20*8M und 67.80 1.00 67.80 1.00 67.80 0.00 0.00 0.00 0.00
TERMOMETRO INFRARROJO und 466.10 1.00 466.10 1.00 466.10 0.00 0.00 0.00 0.00
PULSOMETRO DIGITAL und 271.19 1.00 271.19 1.00 271.19 0.00 0.00 0.00 0.00
TENSIOMETRO und 156.78 1.00 156.78 1.00 156.78 0.00 0.00 0.00 0.00
ESTETOSCOPIO und 88.98 1.00 88.98 1.00 88.98 0.00 0.00 0.00 0.00
CONTENEDOR DE DESECHOS und 80.51 7.00 563.57 7.00 563.57 0.00 0.00 0.00 0.00
TACHOS DE COLOR (SEGUN NORMA) und 72.03 6.00 432.18 6.00 432.18 0.00 0.00
BALDE DE 18 LIT und 16.95 10.00 169.50 10.00 169.50 0.00 0.00 0.00 0.00
MOCHILA FUMIGADORA PULVERIZADOR MANUAL und 406.78 2.00 813.56 2.00 813.56 0.00 0.00 0.00 0.00
TANQUE DE AGUA DE 600 LT INC. LAVAMANOS und 508.47 4.00 2,033.88 4.00 2,033.88 0.00 0.00 0.00 0.00
COSTO DIRECTO: S/.195,079.62 S/.78,552.75 S/.67,804.90 S/.52,643.36
GASTOS GENERALES: 16.26% S/.31,727.38 S/.12,775.67 S/.11,027.66 S/.8,561.82
UTILIDAD: 6.30% S/.12,281.43 S/.4,945.37 S/.4,268.73 S/.3,314.22
SUB TOTAL: S/.239,088.44 S/.96,273.79 S/.83,101.29 S/.64,519.39
IGV: 18% S/.43,035.92 S/.17,329.28 S/.14,958.23 S/.11,613.49
TOTAL: S/.282,124.36 S/.113,603.07 S/.98,059.52 S/.76,132.88
CRONOGRAMA DE SUB CONTRATOS
PROYECTO: MEJORAMIENTO Y AMPLIACIÓN DE AGUA POTABLE Y SANEAMIENTO EN EL CASERIO DE PUCALLPA, DISTRITO DE CAJAY - PROVINCIA DE HUARI - DEPARTAMENTO DE ANCASH.
FECHA: 08 DE OCTUBRE - 2020
PRESUPUESTO NOVIEMBRE-2020 DICIEMBRE-2020 ENERO-2021 FEBRERO - 2021
PRECIO
DESCRIPCION UND.
S/. CANT. PRESUP. (S/.) CANT. PARCIAL CANT. PARCIAL CANT. PARCIAL CANT. PARCIAL

SC PLAN DE FORTALECIMIENTO COMUNAL EN glb 2,000.00 1.0000 2,000.00


ADMINISTRACION, OPERACION Y MANTENIMIENTO DE 0.25 500.00 0.25 500.00 0.25 500.00 0.25 500.00
LOS SERVICIOS
SC CASETA Y ALMACEN mes 423.73 4.0000 1,694.92 1.00 423.73 1.00 423.73 1.00 423.73 1.00 423.73
SC FICHA DE SINTOMATOLOGIA COVID-19 glb 4.24 150.0000 636.00 37.50 159.00 37.50 159.00 37.50 159.00 37.50 159.00
SC ELABORACION DEL PLAN PARA LA VIGILANCIA, doc 2,466.10 1.0000 2,466.10
PREVENCION Y CONTROL DE COVID-19 EN EL TRABAJO 0.25 616.53 0.25 616.53 0.25 616.53 0.25 616.53

SC MOVILIZACION Y DESMOVILIZACION DE EQUIPO glb 2,425.00 1.0000 2,425.00


LIVIANO Y HERRAMIENTAS 0.25 606.25 0.25 606.25 0.25 606.25 0.25 606.25
COSTO DIRECTO: S/.2,305.51 S/.2,305.51 S/.2,305.51 S/.2,305.51
GASTOS GENERALES: 16.26% S/.374.96 S/.374.96 S/.374.96 S/.374.96
UTILIDAD: 6.30% S/.145.15 S/.145.15 S/.145.15 S/.145.15
SUB TOTAL: S/.2,825.61 S/.2,825.61 S/.2,825.61 S/.2,825.61
IGV: 18% S/.508.61 S/.508.61 S/.508.61 S/.508.61
TOTAL: S/.3,334.22 S/.3,334.22 S/.3,334.22 S/.3,334.22
CRONOGRAMA DE ADQUISICION DE MANO DE OBRA
PROYECTO: MEJORAMIENTO Y AMPLIACIÓN DE AGUA POTABLE Y SANEAMIENTO EN EL CASERIO DE PUCALLPA, DISTRITO DE CAJAY - PROVINCIA DE HUARI - DEPARTAMENTO DE ANCASH.
FECHA: 08 DE OCTUBRE 2020
PRESUPUESTO NOVIEMBRE-2020 DICIEMBRE-2020 ENERO-2021 FEBRERO - 2021
PRECIO
DESCRIPCION UND.
S/. CANT. PRESUP. (S/.) CANT. PARCIAL CANT. PARCIAL CANT. PARCIAL CANT. PARCIAL

OPERARIO hh 18.68 4,275.29 79,862.46 724.88 13540.70 1528.70 28556.12 1480.50 27655.77 541.21 10109.87
OFICIAL hh 14.85 979.34 14,543.27 327.52 4863.66 306.83 4556.41 231.86 3443.10 113.14 1680.10
PEON hh 13.43 9,218.58 123,805.58 2301.36 30907.25 3788.39 50878.15 2326.31 31242.35 802.52 10777.83
TOPOGRAFO hh 21.06 3.70 77.97 2.19 46.10 1.51 31.87 0.00 0.00
COSTO TOTAL: S/.49,357.71 S/.84,022.55 S/.62,341.22 S/.22,567.80
GASTOS GENERALES: 16.26% S/.8,027.45 S/.13,665.27 S/.10,139.06 S/.3,670.38
UTILIDAD: 6.30% S/.3,107.36 S/.5,289.72 S/.3,924.75 S/.1,420.78
SUB TOTAL: S/.60,492.52 S/.102,977.54 S/.76,405.03 S/.27,658.96
IGV: 18% S/.10,888.65 S/.18,535.96 S/.13,752.91 S/.4,978.61
TOTAL: S/.71,381.17 S/.121,513.50 S/.90,157.94 S/.32,637.58