8-Mar-20 No: 26
GENERAL DATAINFORMATION:
Rig Name: ADM-6 DRLG SUPV. MOHAMED HASHEM Water Depth: 77 ONHIRE DAYS: 25.52
Well Name: AMAL-18 STA Night DRLG. MOHAMED SABER RKB-MSL: 95.3 MOVING: 1.52
Location: Gulf Of Suez DRLG ENG ISLAM BADR RKB-THF: 57.5 FT PLANNED DAYS: 48
Field: AMAL FIELD PET. ENG PLANNED TD: 10242 FT TODAY NPT, HR:
PLATFORM: AMAL-B SPUD DATE 29/02/2020 Cumulative NPT, hrs: 6
06:00 Status: RIH W/ 8 1/2" RSS BHA (BHA #7) F/ 3400' T/5650' Daily Cost, USD: $ 102,523
24Hs Summary: till CONT'D DRLG OF 8 1/2" HOLE FROM 5990' TO 6150' (BASE OF S.GHARIB), SWEEP HOLE WITH TANDEM PILL, SPOT 50 BBL HI-VIS PILL ON
Cum. Cost, USD: $ 1,664,709
00:00 BTM, POOH INSIDE CASING,
24Hs plan: CONT'D RIH W/ 8 1/2" RSS BHA (BHA #7) T/6150 FT, DISPLACE HOLE TO OBM AND CONTINUE DRLG TO 10246 FT. A.F.E: MM $6.00
HSE:
Trip Drill: Sour Gas: Fire Drill: 16/02/2020 Days Free Since LTA
Kick Drill: Rig Evac: M O B: LAST BOP TEST 20/02/2020
Drills run Today: STOP CARDS First aid Cases: H2S Drill 21/02/2020
BHA
BHA Number: 7 Length (ft): BHA Wt: 48.00 Wt. below jar IN MUD: 12 KLBS JAR S/N: DJ 10-650-90
Jar in hole (hrs) 20
Components
** BHA #7 : ( 8 1/2" PDC BIT + ATK STEERABLE + 6 3/8" FLEX SUB + 6 3/4" ON-TRACK-STOP + 6 3/4" BCPM + 6 3/4" NM STOP-SUB + 6 3/4" STAB. + 6 CIRC. SUB S/N: 81
3/2" FLOAT-SUB + 6 3/8" BPL+ 6 X 6 1/2" DC + 6 1/2" JAR + 3 X 6 1/2" DC + 24/5" HWDP).
CIRC. SUB HR: 44.5
BIT INFORMATION MUD Information WellControl: Drilling Information
Bit Number: 2 TEST TIME: Last Csg Depth MD(ft): 3456.5 Motor AKO
Run Number: 3 Mud sys: OBM Last Csg TVD (ft): Motor RPG
Type: PDC Mud type: OBM FIT/LOT (EMW): P/U - S/O- ROT WT.S (klbs):
IADC Code: M223 FLOW LINE TEMP, F 90 current mud wt. Motor RPM
Manufacturer: BAKER HUGHES DEPTH 6150 MAASP (psi): 0 Wt on Bit (klbs):
Size (in.): 8 1/2" MUD WT - PPG 10.50 Last BOP Test: Surface RPM:
Serial No: 5300526 F. VIS.- SEC/Q 65 SCR Pump Information:
Nozzles: 6 * 13 RPM 6 13 DEPTH: Pump PumpLiner Strokes Circ. Rate
TFA : RPM 3 11 time: Number bore(in) Ln(in) SPM (gpm)
BIT FOOTAGE PV - CP 20 SPM: 1
Last Run date: 2/3/2020 YP - lb/100ft2 26 Pump1 -psi 2
total on-btm(hrs) 57.42 GEL 10S - lb/100ft2 12 Pump2 -psi Stand-Pipe (psi):
TOTAL FOTAGE: 1538.0 GEL 10M - lb/100ft2 15 Pump3 -psi Flowrate (gpm):
current run depth: 3900 API FILTRATE HPHT 6 Directional Survey Information:
Today on-btm hrs: 3.68 CAKE API/HTHP- 1/32 1 MD Angle AZI TVD Vertical Coordinates DLS
Today footage: 160.0 RETORT WATER 17% 4983.00 32.02 37.79 4780.89 714.69 867964.61 599154.56 0.84
Today ROP (on btm) 45.0 RETORT BASE FLUID 69% 5080.00 32.55 38.41 4862.89 766.05 867974.36 599167.00 0.64
RETORT SOLIDS 14% 5176.00 32.61 38.13 4943.78 817.42 867984.13 599179.38 0.17
OIL % 5272.00 32.51 37.84 5024.69 868.73 867993.83 599191.80 0.19
ALKALINITY 4 5366.00 32.76 37.61 5103.85 919.05 868003.29 599204.03 0.30
DULL GRADING WATER % 5461.00 32.77 37.90 5183.74 970.09 868012.89 599216.43 0.17
Inner Rows: MP-CCs H2SO4 5555.00 32.74 37.87 5262.79 1020.59 868022.42 599228.68 0.04
Outer Rows: O/W % 5651.00 32.71 37.65 5343.55 1072.11 868032.11 599241.19 0.13
Dull Charac.: EXCESS LIME 5 5747.00 32.72 38.76 5424.33 1123.66 868041.90 599253.63 0.62
Location: CL-Mg/L 32,000 5842.00 32.58 39.92 5504.32 1174.69 868051.81 599265.72 0.68
Bearing Seals: CACL2 - %/WT 22.8 5938.00 32.52 38.74 5585.24 1226.11 868061.80 599277.91 0.66
Gauge: ELECT. Stability - Volts 600 6035.00 32.41 39.21 5667.08 1277.92 868071.79 599290.25 0.28
Other Dull: KCL %
Reason Pulled:
CONSUMABLES
PRODUCT PREV. BBLS RCVD. BBLS USED BBLS TODAY BBLS USABLE REQUIRED
P/ WATER, BBL 490 80 80 490 0
D/ WATER, BBL 176 0 0 176
DIESEL, BBL 626 0 41 585 365
BULK MATERIAL
PRODUCT PREV. RCVD. USED TODAY (CU.FT) TODAY (SACKS) TODAY (MT)
CEMENT G-NEAT #1 800 442 358 358.00
CEMENT G-NEAT #2 0 0 0 0.00
CEMENT G-NEAT #3 0 0 0 0.00
BARITE #1, CU.FT 56 0 7 49 66.22
BARITE #2, CU.FT 0 0 0 0.00
BARITE #3, CU.FT 0 0 0 0.00
1of2
Allowed Loads
TOTAL 24.0
OPERATION AFTER MIDNIGHT
0:00 4:00 4.0 RIG IS ZERO RATE FOR PREPARING OBM. (DUE TO LIMITED VARIABLE LOADS).
4:00 6:00 2.0 RIH W/ 8 1/2" RSS BHA (BHA #7) F/ 3400' T/5650 FT.
** PERFORMED VERIFICATION ELECTRONIC TEST FOR BAKER MWD & DIRECTIONAL EQUIP.
** HOLE IN GOOD CONDITION
TOTAL 6.0
LOGISTIC SERVICES $
1034
15000
4750 4750 4750 4750 4750 4750 4750 4750
8000 12000
8750
40000
32000
5950 6630 2805 2805 5100 4675 4675 4675
1000
1200 1200 1200
2000 2000 2000 2000 2000
1466 1466
4155 4155
900 900
195 195
40000
350 350
200 200
12000
67000
500 500 500 500 500 500
400 400 400 400 400 400
12000
1397 29917
29750 17000
31000 31000
1000 1000
500 500
400 400
1466 1466
7850 7850
900 900
190 190
4000 4000
350 350
200 200
1000 1000
500 500
500 500
4750 4750
1000 1000
$ 86,753 $ 102,523 $ - $ - $ - $ - $ - $ -
$ 1,562,186 $ 1,664,709 ### ### ### ### ### ###
15-Mar-20 16-Mar-20 17-Mar-20 18-Mar-20 19-Mar-20 20-Mar-20 21-Mar-20 22-Mar-20
$ - $ - $ - $ - $ - $ - $ - $ -
### ### ### ### ### ### ### ###
23-Mar-20 24-Mar-20 25-Mar-20 26-Mar-20 27-Mar-20 28-Mar-20 29-Mar-20 30-Mar-20
$ - $ - $ - $ - $ - $ - $ - $ -
### ### ### ### ### ### ### ###
31-Mar-20 1-Apr-20 2-Apr-20 3-Apr-20 4-Apr-20 5-Apr-20 6-Apr-20 7-Apr-20
$ - $ - $ - $ - $ - $ - $ - $ -
### ### ### ### ### ### ### ###
8-Apr-20 9-Apr-20 10-Apr-20 11-Apr-20 12-Apr-20 13-Apr-20 14-Apr-20 15-Apr-20
$ - $ - $ - $ - $ - $ - $ - $ -
### ### ### ### ### ### ### ###
16-Apr-20 17-Apr-20 18-Apr-20 19-Apr-20 20-Apr-20 21-Apr-20 22-Apr-20 23-Apr-20
$ - $ - $ - $ - $ - $ - $ - $ -
### ### ### ### ### ### ### ###
24-Apr-20 25-Apr-20 26-Apr-20 27-Apr-20 28-Apr-20 29-Apr-20 30-Apr-20 1-May-20
$ - $ - $ - $ - $ - $ - $ - $ -
### ### ### ### ### ### ### ###
2-May-20 3-May-20 4-May-20 5-May-20 6-May-20 7-May-20 8-May-20 9-May-20
$ - $ - $ - $ - $ - $ - $ - $ -
### ### ### ### ### ### ### ###
10-May-20 11-May-20 12-May-20 13-May-20 14-May-20 15-May-20 16-May-20 17-May-20
$ - $ - $ - $ - $ - $ - $ - $ -
### ### ### ### ### ### ### ###
18-May-20 19-May-20 20-May-20 21-May-20 22-May-20
$ - $ - $ - $ - $ -
### ### ### ### ###