Providing and laying Hand packed stone filling or soling with stones including SEVEN
10 NA cu.m 14.640 2100.000 30744.000
sand filling in voids in causeway floor HUNDRED
FORTY
FOUR
SIXTY SIX
Providing and laying in position plain cement concrete 1:1.5:3 (1 cement : 1.5 THOUSAND
11 NA sand : 3 graded crushed rock 20 mm nominal size) excluding the cost of cu.m 8.820 7500.000 66150.000 ONE
centering and shuttering-All work upto plinth level-causeway floor HUNDRED
FIFTY
TWENTY
FIVE
THOUSAND
Providing & fixing Thermo-Mechanically Treated reinforcement bar (Yield
ONE
12 NA Strength 500 MPa) for R.C.C work including cutting, bending, binding and kg 279.630 90.000 25166.700
HUNDRED
placing in position complete-temperature reinforcement, 8mm dia.@200 c/c
SIXTY SIX
POINT
SEVEN
TWENTY
THOUSAND
Dry hand packed rubble masonry hammer dressed (facing), with stone-boulder >
13 NA cu.m 4.500 4500.000 20250.000 TWO
0.01 cu.m, u/s apron
HUNDRED
FIFTY
Preparation of sub grade with proper camber by excavating earth to depth equal FORTY
14 NA to pavement thickness, consolidation with roller, disposal of surplus earth up to cu.m 28.000 1500.000 42000.000 TWO
50m ; All kinds of soil in approach at 5% slope THOUSAND
Consolidation of sub-grade with roller, and making good the undulation with earth FIFTY SIX
15 NA sq.m 70.000 800.000 56000.000
and re-rolling the sub grade THOUSAND
EIGHT
HUNDRED
ONE
THOUSAND
Grand
801240.700 TWO
Total:
HUNDRED
FORTY
POINT
SEVEN

This Bill of Quantities (BoQ) is Electronically Signed by Mrs. PEMA on behalf of M/S PDBUMZANG CONSTRUCTION

M/S.PELJOR SHERAB CONSTRUCTION


Bill of Quantities (BoQ)

Bill of Quantities (BoQ)


Sl. Item Amount [in
Description UoM Qnty Rate Amount
No. Code words]

Excavation of road formation/trace/box cutting, with excavator including


separate deposition of soil, rocks and stones within 50m for reuse including the
cost of transport of excavator and all required machneries & equipment ONE
(mobilization and demobilization) upto and from the work site-All types of soil- HUNDRED
1 NA m 60.000 2500.000 150000.000
road formation cutting 5.1m wide up to 10m vertical height of cut slope. The FIFTY
item rate shall include all incidental cost of mobilzation and demobilization such THOUSAND
as transport of Excavator and all equired mahineries to the site of work and
back including acccessibility to the site and its associated cost.
Excavation of road formation/trace/box cutting, with excavator including
separate deposition of soil, rocks and stones within 50m for reuse including the
ONE
cost of transport of excavator to and from the site-All types of rocks with or
HUNDRED
without blasting or chieselling where blasting is prohibited-improvement of Zig-
2 NA m 30.000 4900.000 147000.000 FORTY
formation width 5.10m in cut & batter/cut slope greater than 10m verticl height
SEVEN
of cut slope. The item rate shall include all incidental cost of mobilzation and
THOUSAND
demobilization such as transport of Excavator and all equired mahineries to the
site of work and back including acccessibility to the site and its associated cost.
3 NA Earthwork in excavation over areas, exceeding 300mm in depth, 1.5 m in width cu.m 32.928 250.000 8232.000 EIGHT
as well as 10 sq.m on plan including disposal of excavated earth (disposed THOUSAND
earth to be levelled and neatly dressed), Hard Soil (as per site condition) TWO
HUNDRED

https://www.egp.gov.bt/officer/IndReport.jsp?tenderId=4162&formId=47971 7/14
4/1/2020 Individual Report
THIRTY
TWO
TWENTY
SEVEN
THOUSAND
Excavation in foundation trenches or drains not exceeding 1.5m in width or area
SIX
4 NA 10 sq.m on plan, including dressing & ramming, disposal of surplus soil within cu.m 98.601 280.000 27608.280
HUNDRED
50m lead & 1.5m lift-Ordinary soil for Vented Causeway.
EIGHT
POINT TWO
EIGHT
FOUR
THOUSAND
Supplying/collection and stacking at site, Gravel/Coarse sand including placing SIX
5 NA cu.m 3.308 1400.000 4631.200
and levelling complete (gravel filling around RC hume pipe) HUNDRED
THIRTY ONE
POINT TWO
FORTY
SEVEN
THOUSAND
Providing & laying NP2 class R.C pipes, including collars, jointing in cement
6 NA m 7.350 6500.000 47775.000 SEVEN
mortar 1:2 including testing of joints etc., complete-900mm dia.
HUNDRED
SEVENTY
FIVE
TWO
THOUSAND
Filling of trenches, sides of foundations etc., in layers<200mm using selected
ONE
7 NA excavated earth, ramming etc., within lead 50 m & lift 1.5m, around RC hume cu.m 21.830 100.000 2183.000
HUNDRED
pipe
EIGHTY
THREE
FOURTEEN
Providing and laying in position 1:3:6 (1 cement :3 sand : 6 graded crushed rock THOUSAND
8 NA 40 mm nominal size) plain cement concrete including the cost of centering and cu.m 2.822 5000.000 14110.000 ONE
shuttering-All work upto plinth level, in footing for walls HUNDRED
TEN
ONE
HUNDRED
SEVENTY
Providing & laying Random Rubble Masonry with hard stone in foundation & THOUSAND
9 NA cu.m 43.118 3950.000 170316.100
plinth In cement mortar 1:6-Retaining wall THREE
HUNDRED
SIXTEEN
POINT ONE
TWENTY
SEVEN
Providing and laying Hand packed stone filling or soling with stones including THOUSAND
10 NA cu.m 14.640 1900.000 27816.000
sand filling in voids in causeway floor EIGHT
HUNDRED
SIXTEEN
FIFTY ONE
Providing and laying in position plain cement concrete 1:1.5:3 (1 cement : 1.5 THOUSAND
11 NA sand : 3 graded crushed rock 20 mm nominal size) excluding the cost of cu.m 8.820 5800.000 51156.000 ONE
centering and shuttering-All work upto plinth level-causeway floor HUNDRED
FIFTY SIX
FORTY ONE
THOUSAND
Providing & fixing Thermo-Mechanically Treated reinforcement bar (Yield NINE
12 NA Strength 500 MPa) for R.C.C work including cutting, bending, binding and kg 279.630 150.000 41944.500 HUNDRED
placing in position complete-temperature reinforcement, 8mm dia.@200 c/c FORTY
FOUR
POINT FIVE
SEVENTEEN
THOUSAND
Dry hand packed rubble masonry hammer dressed (facing), with stone-boulder
13 NA cu.m 4.500 3900.000 17550.000 FIVE
> 0.01 cu.m, u/s apron
HUNDRED
FIFTY
SIXTEEN
Preparation of sub grade with proper camber by excavating earth to depth equal THOUSAND
14 NA to pavement thickness, consolidation with roller, disposal of surplus earth up to cu.m 28.000 595.000 16660.000 SIX
50m ; All kinds of soil in approach at 5% slope HUNDRED
SIXTY
15 NA Consolidation of sub-grade with roller, and making good the undulation with sq.m 70.000 255.000 17850.000 SEVENTEEN
earth and re-rolling the sub grade THOUSAND

https://www.egp.gov.bt/officer/IndReport.jsp?tenderId=4162&formId=47971 8/14

Вам также может понравиться