Вы находитесь на странице: 1из 6

Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment

Once printed this specification becomes an uncontrolled copy of the online version.

10.35.01.1121
NS-1™ Number: NS 10.35.01.1121
Revision Date: June 2007
Equipment Name: LANDING NIPPLES FOR SCSSV (INTEGRAL HYDRAULIC PORT)
Manufacturer: GENERAL
Model/Type: VARIOUS
Material Group: LOW ALLOY STEEL
Service: SOUR

Rev Date Description Change Note


00 11/94 REVISIONS: SCOPE PAGE – ADDED ISO 10432 & ISO
UNITS, PLUS COSMETIC TEXT CHANGES.
SUPPLEMENTARY REQ: SECTION 2,
REFORMATTED. SECTION 4.2 , TEST PRESSURE
FORMULA REVISED IN ACC. ISO 11960 & ISO UNITS.
01 06/04 MINOR CHANGES.
02 06/07 MINOR HEADER AND FRONT PAGE ADJUSTMENT.

Photocopying or reproducing this page in any way constitutes as infringement of the license agreement
for the continued supply of the NS-1™ Service

NS 1 Page 1
Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment

Once printed this specification becomes an uncontrolled copy of the online version.

SCOPE
This GENERAL NS-1™ specifies the minimum quality and inspection requirements applied to wrought Low Alloy
Steel Landing Nipples for Surface Controlled Subsurface Safety Valves, with Integral Hydraulic Port.

It applies to:

• SOUR service conditions, employing low alloy steel (e.g. 41XX).


• All sizes and Rated Working Pressure of 20.7 MPa (3,000 psi) through 103.4 MPa (15,000 psi) inclusive.

This NS-1™ shall be applied in conjunction with ISO 10432. If in conflict the requirements of this NS-1™ shall
prevail.

Design verification, and other design related parameters are specifically excluded from this NS-1™.

Photocopying or reproducing this page in any way constitutes as infringement of the license agreement
for the continued supply of the NS-1™ Service

NS 1 Page 2
Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment

Once printed this specification becomes an uncontrolled copy of the online version.

SUPPLEMENTARY REQUIREMENTS
The following requirements are supplementary to, and shall be applied in conjunction with, the Quality Subspeci-
fications of this NS-1™:

1. WELDING
No fabrication welding shall be performed.

No repair welding shall be performed.

2. MATERIAL TESTING
(Ref. Sub-Spec. 10.1 & Sub-Spec. 10.4)

2.1 Chemical Analysis

Chemical analysis shall be carried out on a heat basis, demonstrating conformance to the
manufacturer’s applicable material specification for all elements contained therein.

2.2 Mechanical Testing

Mechanical testing to ASTM A370 shall, as a minimum, establish yield strength, tensile strength,
elongation and reduction in area on a heat basis, representative of any heat treatment that may have
been applied.

3. HARDNESS TESTING
(Ref. Sub-Spec. 70.1)

Hardness tests shall be carried out on each finished part, and shall meet the requirements of NACE MR0175.

4. HYDROSTATIC TESTING
(Ref. Sub-Spec. 100.2)

4.1 The hydrostatic test pressure shall be calculated by applying a fibre stress value of at least 80% of
the specified minimum yield strength.

4.2 Where the test pressure is limited by the threaded end connections, it shall be calculated using the
following formula:

P = (2 . f . Yp . t) / D

Where:
P = hydrostatic test pressure, in (MPa)
f = a factor of 0.8 of specified minimum yield strength
Yp = specified yield strength for the pipe body (MPa)
t = nominal design wall thickness adjacent to thread connection (mm)
D = nominal outside diameter of the connecting thread (mm)

Photocopying or reproducing this page in any way constitutes as infringement of the license agreement
for the continued supply of the NS-1™ Service

NS 1 Page 3
Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment

Once printed this specification becomes an uncontrolled copy of the online version.

4.3 As a minimum, the hydrostatic test pressure shall not be less than the equipment rated working
pressure.

4.4 Test pressure shall be held for not less than five seconds. Ten percent (10%) of the order quantity,
with a minimum of one (1) shall be held at test pressure for not less than ten (10) minutes. The
timing of the holding periods shall not start until the test pressure has stabilized, the equipment and
measuring devices have been isolated from the pressure source and the external surfaces of the
equipment thoroughly dried.

4.5 There shall be no leakage or reduction in indicated pressure.

Photocopying or reproducing this page in any way constitutes as infringement of the license agreement
for the continued supply of the NS-1™ Service

NS 1 Page 4
Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment

Once printed this specification becomes an uncontrolled copy of the online version.

MATRIX
Equipment Name: Landing Nipples for SCSSV (Integral Hydraulic Port)
Specification: 10.35.01.1121
Manufacturer: General
Model/Type: Various
Material Group: Low Alloy
Service: Sour

Nipple Housing
Class: A, B, D Material: Wrought Low Alloy Steel
Number Title
10.1 Material Certificates – General
10.2.2 Material Certificates – Assembly Certificate
10.4 Type B Material Test Certificate
20.2 Traceability – Heat Traceability
20.3 Traceability – Serialization Traceability
40.1 NDE Surface, General
40.4.1.3 Magnetic Particle Examination (MT) of Forgings, Mech. Tubing and Barstock – Technique – MT
Tech. Wet Fluor. Forg.
40.4.2.3 Magnetic Particle Examination (MT) of Forgings, Mech. Tubing and Barstock – Required Extent –
One Hundred Percent
40.4.3.6 Magnetic Particle Examination (MT) of Forgings, Mech. Tubing and Barstock – Acceptance
Standard – Maximum Permitted Relevant Indications
40.6.1.3 Magnetic Particle and Visual Examination (MT + VE) of Threads – Technique – Wet Fluorescent
Method
40.6.2.3 Magnetic Particle and Visual Examination (MT + VE) of Threads – Required Extent – One
Hundred Percent
40.6.3.2 Magnetic Particle and Visual Examination (MT + VE) of Threads – Acceptance Standard –
Relevant Indications
60.1 Disposition of Defects – Surface Dressing
70.1 Hardness Testing – General
90.1 Dimensional Inspection – General
90.2 Dimensional Inspection – Threads
100.2 Hydrostatic Testing – General
160.1 Non-Conformity Procedure – General
170.1 Boxing/Packing/Marking – General
170.2 Boxing/Packing/Marking – Critical Service (H2S, CO2, Low Temperature)
180.1.3 Quality Documentation for Non-Welded Products

Photocopying or reproducing this page in any way constitutes as infringement of the license agreement
for the continued supply of the NS-1™ Service

NS 1 Page 5
Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment

Once printed this specification becomes an uncontrolled copy of the online version.

Appendix 1

Photocopying or reproducing this page in any way constitutes as infringement of the license agreement
for the continued supply of the NS-1™ Service

NS 1 Page 6

Вам также может понравиться