SL Type of Work Chemical Name Work Procedure & Dosages Advantage

Plasticizer & water reducer, Stop the corrosion of


Con-Lub Supply Con-Lub of Baral Chemicals for treatment of concrete, Early & ultimate high strength, No Segregation
(a plasticizer & water
01 Pilling Pilling, To prepare a mixture of concrete in proportion of by much vibration, Anti-rust& auto rust remover, Partial
reducer concrete
admixture) 250 ml Con-Lub with 50kg of cement concrete. auto curing, Controlling of heat of hydration, Help in
perfect compaction & monolithic bonding
Highly water proofing. Partial strength gaining, Partial
Supply Foam-Lub of Baral Chemicals for treatment of
Basement, ETP, auto curing, No Segregation by much vibration, Stop the
Foam-Lub Underground water tank, overhead tank, basement,
WTP, Swimming corrosion of concrete, Controlling of heat of hydration,
02 (a water proofing retaining wall etc, To prepare a mixture of concrete in
Pool, Water Tank, concrete admixture) Anti-rust & auto rust remover, Help in perfect
proportion of 250 ml to 400 ml Foam-Lub with 50kg of
Drake-Line. compaction & monolithic bonding with old and new
cement.
concrete.
Con-Lub Supply Con-Lub of Baral Chemicals for treatment of Vim, Plasticizer & water reducer, Early & ultimate high
Super Structure (a plasticizer & water Colum, slab Concrete and any others RCC concrete. To strength, Stop the corrosion of concrete, No Segregation
03
Concrete reducer concrete prepare a mixture of concrete in proportion of 250-300 ml by much vibration, Anti-rust& auto rust remover, Partial
admixture) Con-Lub with 50kg of cement concrete auto curing, Controlling of heat of hydration.
Supply Con-Lub of Baral Chemicals for treatment of Plasticizer & water reducer, Early & ultimate high
Industrial Floor Foam-Lub Industrial ground floor CC or RCC concrete. To prepare a strength, Stop the corrosion of concrete, No Segregation
04 (CC or RCC) (a multipurpose
concrete admixture) mixture of concrete in proportion of 250 ml to 400ml Con- by much vibration, Anti-rust& auto rust remover, Partial
Concrete
Lub with 50kg of cement concrete auto curing, Controlling of heat of hydration.
Supply Foam-Lub of Baral Chemicals for treatment for
Foam-Lub inside and outside brick walls. Prepare sand-cement mortar Water proofing, Damp proofing, Strength gaining,
05 Plaster (a multipurpose for plaster with admixture of Foam-lub in proportion with Partial auto curing, Reduce hair cracks, void, porosity
concrete admixture) cement as 500-1000 ml foam-lub: 50kg of cement etc., Make a smooth plaster surface.

Supply Desalt-S01 of Baral Chemicls for anti-salinity


treatment at inside and outside brick wall. Prepare a mixture Permanently prevent from salt, Permanently stop the
Desalt-S01 in proportion of (1 liter of Desalt-S01, 10 liter of Water and carbonation process, Fills the porosity and void.
Anti-Salinity
06 (sealer and salinity in 25ml or 1 point/mark of Catalyst). Apply one coat of the
Treatment activator) mixture within 2 hours of preparation on exposed brick
surface with a jute brush.Coverage: 350sft/ltr
SL Type of Work Chemical Name Work Procedure & Dosages Advantage
Supply Foam-Lub (Meta) of Baral Chemicals for
treatment of top slab RCC Concrete (heat reducing, Heat reducing, Water proofing, Damp proofing, Reduce
Foam-Lub (Meta) water& damp proofing, strength gaining, anti-corrosive, heat of hydration, Partial auto curing, Super monolithic
(a water proofing & heat partially auto-curing, shrinkage factor controlling of heat bonding of new and old concrete
07 Roof Slab Concrete
insulating concrete of hydration etc). To prepare a mixture of concrete in
admixture) proportion of 500 ml Foam-Lub (Meta) with 50kg of
cement.

Remove existing CC/patent stone/neat cement finishing on


the top slab. Chipping and clean the surface of base Permanently prevent from salt, Heat reducing, Water
concrete properly. Supply Desalt-S01 and Foam-Lub proofing, and Damp proofing, Reduce heat of hydration,
(Meta) of Baral Chemicals for Anti-Salinity, Heat Partial auto curing, Super monolithic bonding of new
insulating & Water proofing treatment at roof of buildings. and old concrete
To Prepare a mixture in proportion of 1 liter of Desalt-
S01, 10 liter of water and 25 ml of Catalyst. Apply 1 Coat
of the mixture within 2 hours of Preparation with a Jute
Brush/Broom all over the roof surface.To Prepare a
mixture of Curdy- Dense Foam-Lub (Meta) Cement grout
Desalt-S01
Foam-Lub (Meta) in proportion of 2 liters of Foam-Lub (Meta), 40 liters of
Roof Treatment
08 (a water proofing & heat Water and 1 bag or 50 Kgs of cement. Apply prepared
(Jalchad) insulating concrete Cement Grout with a broom on Roof surface. After
admixture)
applying Cement Grout, make 3” CC patent stone casting (
Ratio 1:2:4). To prepare a mixture of Concrete in
proportion of 500 ml Foam-Lub (Meta) with 50 Kg of
Cement. Chips size is 1/2” down. Wire Mesh (22 Gage) or
Expending Metal Net (1" to 1.5"gap) have to use in middle
position of the patent stone. Curing properly and Use the
mixture within 1 hour of preparation. Coverage Desalt-S 01
350-400 sft/ltr& Foam-Lub (Meta) 500-1000 ml per bag of
cement.
SL Type of Work Chemical Name Work Procedure & Dosages Advantage
Supply GrayCementitious Alloy of Baral Chemicals or
Gray Cementitious equivalent for treatment for repairing Leakage, Crack, Void Stop the constructional running water, Permanent &
Alloy and Honey-comb of building. Initially 1Kg Gray quick solution of faulty construction, Prevent the water
09 Leakage Treatment leakage, cracks, honey combs etc.
(water leakage Cementitious Alloy is to be mixed with 350 ml water.
chemical) Quantity depend on site condition. Coverage as per project
requirement.

Supply Desalt-S01 and Hydro-Seal,Ef-34 of Baral chemicals Permanently prevent from salt, To make surface water
for Machine Made/Ceramic brick face treatment on claded replant, Permanently prevent from algea, fern, fungi,
or normal exposed fair face brick and sand stone to prevent moss etc., Keep the exposed surface as it as, Protect the
salinity, water absorption and growth of algae. Prepare a surface from water socking.
mixture in proportion of 1 liter of Desalt-S01, 10 liter of
Water and 25ml or 1 point/mark of Catalyst. Apply one coat
of mixture with a jute brush or spray. Use the mixture within
2 hours of preparation. After 12 hours of application, clean
the surface with water using soft brush. Wait 4 days
Desalt-S01 minimum for drying the surface. On dried up surface, apply
Fair Face Brick &
Hydro-Seal,Ef-34 one coat of Hydro-Seal, Ef-34 mixture prepared in
10 Sand Stone
(a water repellant proportion of 1 litre of Hydro-Seal Ef-34, 6 litre of water and
Treatment.
chemical) 25 ml or1 point/mark of T. catalyst using jute brush. After
one day apply second coat of Hydro-Seal, Ef-34 mixture
prepared in proportion of 1 liter of hydro-Seal, Ef-34, 5 liter
of water & 25 ml or 1 point/mark of T. catalyst on the same
dried surface. Again after one day of the applying 2 nd coat,
apply third coat of hydro-Seal, Ef-34 mixture prepared in
same proportion of second coat on the same dried surface.
Coverage: Desalt-S01 350-400 sft/ltr and Hydro-Seal,Ef-34
150-200sft/ltr
Chemical
SL Type of Work Work Procedure & Dosages Advantage
Name

Supply Desalt-S01, Hydroseal Ef-32, and Foam-Lub of Baral Permanently prevent from damp, 100% water proofing
Chemicals and associates materials (Coal-Tar, Kerosin) for and damp proofing, Monolithic bonding with concrete
treatment for water Proofing Felt membrane and Anti-Salinity
and creates cement gumming effects, Protect the slab
at Basement floor. To Prepare a mixture in proportion of 1 liter
of Desalt-S01, 10 liters of water and 25 ml of Catalyst. Apply 1 from damp if you make swimming pool and gardening.
Coat of the mixture within 2 hours of Preparation with a Jute
Basement Floor, Brush. To Prepare a mixture of 4 liters of Hydro seal Ef-32, 4
Ground Floor liters of water, and 100 ml of T-Catalyst and 50 ml of R-
Hydro-Seal,Ef-32
11 Water & Damp Catalyst in a Bucket. In another Bucket Prepare a mixture of 4
(a liquid felt)
Proofing Liquid liters of Coal-tar and 1 liter of Kerosin, Mix the elements of the
Felt Treatment. Buckets together properly. Apply 3 Coats of prepared mixture
with Jute Brush on the floor surface at an interval of 12 hours;
water will be reduced by 2 liters in the 2nd Coat and without
water in the 3rd Coat. After applying 3rd coat, spread cement
on it and make 3” CC casting. To prepare a mixture of
Concrete in proportion of 250 ml Foam-Lub with 50 Kg of
Cement. Coverage (Hydro-Seal, Ef-32) 25 sft/ltr.

Chipping and clean the surface of base concrete properly.


Prepare a mixture of Curdy- Dense Foam-Lub Cement grout in Help in perfect compaction & monolithic bonding with
12 Concrete Joint Foam-Lub
proportion of 2 liters of Foam-Lub, 38 liters of Water and 1 old and new concrete.
bag or 50 Kg of cement.

SL Type of Work Chemical Name Work Procedure & Dosages Advantage

Supply Pestearthy of Baral Chemicals for treatment for Permanently prevention of termite, Prevents the attack
13 Anti Termite Pestearthy Anti-termite inside of floor/building .At first fill the floor from earth habitant insects, Nonvolatile and permanent
Treatment (Inside (termite with sand and soil. Then spread Pestearthy equally on the existence in soil, Environment friendly.
Floor) controlling powder) surface of the floor. 1 kg Pestearthy spread 300 sft of
coverage area.

Supply Pestearthy of Baral Chemicals for treatment for


Anti-termite in outside of building .Dig the canal in the soil Permanently prevention of termite, Prevents the attack
from earth habitant insects, Nonvolatile and permanent
outside and attached to the external wall and make a
existence in soil, Environment friendly.
surrounding canal of 2'(two feet) wide and 2'(two feet) deep.
Spread Pestaerthy equally on the bottom layer of the canal.
Anti Termite Pestearthy Fill up half of the canal with soil or sand. Then spread
14 Treatment (Outside (termite
Pestearthy as 2nd layer the half-filled canal by the same
Barriers) controlling powder)
way.After that fill up the3/4 of the canal with soil or sand
and spread Pestearthy as 3rd or final layer on the surface and
fill the rest part of the canal with sand,soil,cc etc. Pestearthy
1 kg spread surrounding canal of 3 layers by 40 rft. Coverage
per kg pestearthy 40 rft only out side barriers.