Академический Документы
Профессиональный Документы
Культура Документы
SI.No System Serial Number Location / Details of the Date on Action taken
Department problem which it report
went
down
Nil
3. UPS machines
No. of UPS installed (Capacity wise) :2 (5kv)
No of UPS working 2
Not working UPS details nil
UPS Serial Number Location Details of the Date on Action taken
SI.No problem which it report
went
down
nil
4. Network LAN switches
No. of LAN switchesinstalled: 4
No of LAN switches working : 4
Not working switches details
SI.No LAN switch Serial Location Details of the Date on Action taken
Number problem which it report
went
down
Nil
5. Connectivity issues :
Details of down time ( both TNSWAN and MPLS - redundant) Date wise downtime
should be mentioned this week regularly. TNSWAN connectivity is not
. Connectivity is very slow Net On
provided,MPLS
25.06.2019 , 26.06.2019 , 27.06.2019 , 28.06.2019
Any issue pertaining to HMIS software ( Functionality, Usage, EMR screen modification, report generation
etc)
Note : As all the above items are under comprehensive warranty period for 3 years, Break downs should be
immediately reported to the vendor concerned through the I T Coordinator and a similar report should be
sent to HMIS help desk. The defects / break downs if any should be set right at the earliest.
Sl.No Name of the Staff Designation Training Specialty/Department Date of Time No of TCS
Module training duration trainers
1. Dr.T.Rajakumar MD Chief civil surgeon MIS Thoracic Medicine NIL
2. Dr.R. Neduncheliyan MD., Chief civil surgeon MIS Thoracic Medicine NIL
DTCD
3 TMT.G.Parvathyiammal Nursing Superintendent MIS Thoracic Medicine NIL