Академический Документы
Профессиональный Документы
Культура Документы
Sir:
Thank you for providing us with the opportunity to submit our project proposal.
This is with regards to solve the issue concerning the increase in inventory cost
and loss in inventory. Along with this letter we provide a detailed proposal that
includes the timeline and necessary actions to take. Let us know if you have any
questions or want any modifications. We will feel honored if our proposal will be
accepted by the organization.
Sincerely Yours,
Rnavarez
RONEL NAVAREZ
XYZ Merchandise
Padada, Davao del Sur, 8007
09503687943
xyzmerchandise@gmail.com
PROJECT PURPOSE
To present solution to existing issue on increase of inventory cost and losses in
inventory.
PROPOSED SOLUTION
The proposed solution is to create a Warehouse Management and Control
System with an integrated Inventory Control Monitoring System (ICMS)-based
technology.
ADVANTAGE
This will upgrade the entire inventory handling process by providing an
automated, systematic and accurate warehouse management cycle that is
efficient and updated real-time processes.
To illustrate, pallets, cases, cartons, and all other storage items will be coded
using ICMS, in which all items will be checked and monitored by this system.
These codes are recognized by readers installed in the shelves and transporting
equipment. As a result, all movements of goods within the warehouse are
tracked and accounted; use of space, equipment and labor is maximized; and
retrieval of goods as needed becomes systematic – all of these contributing to
increased customer service, productivity level, and warehouse utilization.
Disadvantage
This will be costly considering the reengineering process, employee training and
installations.
Summary
The utilization of this system will result to higher efficiency, reduction of cost and
increase in revenue. This system should be implemented for in gives a lot of
benefit. The benefit also includes the customer satisfaction because of less
defective products sold to them. Though it is expensive but this project will serve
the organization in the long run.