Name of Project : Rehabilitation of Roads and Drainage
Location of Project :Urban Road Maliana (23.03Km)
Contractor :NALO BUL Unipessoal Lda
Contract Number :
Amount
ITEM NO. DESCRIPTION
(US$)
Samuel Yulianto Exposto, Lic.Tec Eng. Santino Barreto Eng. Rogerio da Costa Freitas
Engineer Tecnico DNEPCC Chefe Sec. Apoio Tecnico
REPÚBLICA DEMOCRÁTICA DE TIMOR LESTE
REHABILITAÇÃO DE ESTRADAS
MINISTÉRIO DAS OBRAS PÚBLICAS
BACK UP QUANTITY
Width (l.m.)
Station Distance Area (sq.m.) Remarks
Width per Section Average Width (l.m.)
0+900 6.00
0+920 6.00 6.00 20.00 120.00
0+940 6.00 6.00 20.00 120.00
0+960 6.00 6.00 20.00 120.00
0+980 6.00 6.00 20.00 120.00
1+000 6.00 6.00 20.00 120.00
1+020 6.00 6.00 20.00 120.00
1+040 6.00 6.00 20.00 120.00
1+060 6.00 6.00 20.00 120.00
1+080 6.00 6.00 20.00 120.00
1+100 6.00 6.00 20.00 120.00
1+120 6.00 6.00 20.00 120.00
1+140 6.00 6.00 20.00 120.00
1+160 6.00 6.00 20.00 120.00
1+180 6.00 6.00 20.00 120.00
1+200 6.00 6.00 20.00 120.00
1+220 6.00 6.00 20.00 120.00
1+240 6.00 6.00 20.00 120.00
1+260 6.00 6.00 20.00 120.00
1+280 6.00 6.00 20.00 120.00
1+300 6.00 6.00 20.00 120.00
1+320 6.00 6.00 20.00 120.00
1+340 6.00 6.00 20.00 120.00
1+360 6.00 6.00 20.00 120.00
1+380 6.00 6.00 20.00 120.00
1+400 6.00 6.00 20.00 120.00
1+420 6.00 6.00 20.00 120.00
1+440 6.00 6.00 20.00 120.00
1+460 6.00 6.00 20.00 120.00
1+480 6.00 6.00 20.00 120.00
1+500 6.00 6.00 20.00 120.00
1+520 6.00 6.00 20.00 120.00
1+540 6.00 6.00 20.00 120.00
SUBTOTAL 3,840.00 sq.m.
Width (l.m.)
Station Distance Area (sq.m.) Remarks
Width per Section Average Width (l.m.)
Fernao Soares Reis, ST Eng. Santino Barreto Eng. Rogerio da Costa Freitas
Tecnico Tecnico DN EPCC Chefe Sec. Apoio Tecnico
REPÚBLICA DEMOCRÁTICA DE TIMOR LESTE
REHABILITAÇÃO DE ESTRADAS
MINISTÉRIO DAS OBRAS PÚBLICAS
BACK UP QUANTITY
Fernao Soares Reis, ST Eng. Santino Barreto Eng. Rogerio da Costa Freitas
Tecnico Tecnico DN EPCC Chefe Sec. Apoio Tecnico
REPÚBLICA DEMOCRÁTICA DE TIMOR LESTE
REHABILITAÇÃO DE ESTRADAS
MINISTÉRIO DAS OBRAS PÚBLICAS
BACK UP QUANTITY
Fernao Soares Reis, ST Eng. Santino Barreto Eng. Rogerio da Costa Freitas
Tecnico Tecnico DN EPCC Chefe Sec. Apoio Tecnico
REPÚBLICA DEMOCRÁTICA DE TIMOR LESTE
REHABILITAÇÃO DE ESTRADAS
MINISTÉRIO DAS OBRAS PÚBLICAS
BACK UP QUANTITY
Section Area (sq.m.)
Station Distance Volume (cu.m.) Remarks
Area per Section Average Area (l.m.)
0+900 1.61
0+920 7.27 4.44 20.00 88.82
0+940 2.53 4.90 20.00 97.95
0+960 1.06 1.79 20.00 35.83
0+980 - 0.53 20.00 10.57
1+000 0.02 0.01 20.00 0.22
1+020 - 0.01 20.00 0.22
1+040 0.05 0.03 20.00 0.50
1+060 5.87 2.96 20.00 59.24
1+080 1.63 3.75 20.00 75.05
1+100 - 0.82 20.00 16.31
1+120 - - 20.00 -
1+140 - - 20.00 -
1+160 - - 20.00 -
1+180 - - 20.00 -
1+200 - - 20.00 -
1+220 0.13 0.06 20.00 1.25
1+240 0.10 0.11 20.00 2.20
1+260 - 0.05 20.00 0.95
1+280 - - 20.00 -
1+300 - - 20.00 -
1+320 - - 20.00 -
1+340 4.27 2.14 20.00 42.72
1+360 - 2.14 20.00 42.72
1+380 0.03 0.01 20.00 0.25
1+400 - 0.01 20.00 0.25
1+420 - - 20.00 -
1+440 - - 20.00 -
1+460 - - 20.00 -
1+480 0.00 0.00 20.00 0.01
1+500 0.00 0.00 20.00 0.02
1+520 0.00 0.00 20.00 0.03
1+540 0.00 0.00 20.00 0.03
SUBTOTAL 475.14 cu.m.
Section Area (sq.m.)
Station Distance Volume (cu.m.) Remarks
Area per Section Average Area (l.m.)
Fernao Soares Reis, ST Eng. Santino Barreto Eng. Rogerio da Costa Freitas
Tecnico Tecnico DN EPCC Chefe Sec. Apoio Tecnico
REPÚBLICA DEMOCRÁTICA DE TIMOR LESTE
REHABILITAÇÃO DE ESTRADAS
MINISTÉRIO DAS OBRAS PÚBLICAS
BACK UP QUANTITY
Section Area (sq.m.)
Station Length Volume (cu.m.) Remarks
Width (m) Height (m) (l.m.)
CONSTRUCTION BREAK
1+770 2.70 1.00 - -
1+780 2.70 1.00 10.00 27.00
1+790 2.70 1.00 10.00 27.00
CONSTRUCTION BREAK
2+150 1.35 1.00 - -
2+160 1.35 1.00 10.00 13.50
2+180 1.35 1.00 20.00 27.00
2+200 1.35 1.00 20.00 27.00
2+210 1.35 1.00 10.00 13.50
CONSTRUCTION BREAK
2+410 1.35 1.00 - -
2+420 1.35 1.00 10.00 13.50
2+430 1.35 1.00 10.00 13.50
CONSTRUCTION BREAK
2+510 1.35 1.00 - -
2+520 1.35 1.00 10.00 13.50
2+540 1.35 1.00 20.00 27.00
2+560 1.35 1.00 20.00 27.00
2+580 1.35 1.00 20.00 27.00
2+600 1.35 1.00 20.00 27.00
2+610 1.35 1.00 10.00 13.50
CONSTRUCTION BREAK
2+750 1.35 1.00 - -
2+760 1.35 1.00 10.00 13.50
2+780 1.35 1.00 20.00 27.00
2+800 1.35 1.00 20.00 27.00
2+820 1.35 1.00 20.00 27.00
2+840 1.35 1.00 20.00 27.00
2+850 1.35 1.00 10.00 13.50
CONSTRUCTION BREAK
3+050 2.70 1.00 - -
3+060 2.70 1.00 10.00 27.00
3+070 2.70 1.00 10.00 27.00
CONSTRUCTION BREAK
3+330 1.35 1.00 - -
3+340 1.35 1.00 10.00 13.50
3+360 1.35 1.00 20.00 27.00
3+380 1.35 1.00 20.00 27.00
3+400 1.35 1.00 20.00 27.00
3+410 1.35 1.00 10.00 13.50
CONSTRUCTION OVER TYPE (L/R)
3+410 2.70 1.00 - -
3+420 2.70 1.00 10.00 27.00
3+430 2.70 1.00 10.00 27.00
SUBTOTAL 648.00 cu.m.
Section Area (sq.m.)
Station Length Volume (cu.m.) Remarks
Width (m) Height (m) (l.m.)
CONSTRUCTION BREAK
3+470 1.35 1.00 - -
3+480 1.35 1.00 10.00 13.50
3+490 1.35 1.00 10.00 13.50
CONSTRUCTION OVER TYPE (L/R)
3+490 2.70 1.00 - -
3+500 2.70 1.00 10.00 27.00
3+510 2.70 1.00 10.00 27.00
CONSTRUCTION BREAK
3+550 2.70 1.00 - -
3+560 2.70 1.00 10.00 27.00
3+570 2.70 1.00 10.00 27.00
CONSTRUCTION OVER TYPE (L)
3+570 1.35 1.00 - -
3+580 1.35 1.00 10.00 13.50
3+590 1.35 1.00 10.00 13.50
CONSTRUCTION BREAK
3+650 1.35 1.00 - -
3+660 1.35 1.00 10.00 13.50
3+670 1.35 1.00 10.00 13.50
CONSTRUCTION OVER TYPE (L/R)
3+670 2.70 1.00 - -
3+680 2.70 1.00 10.00 27.00
3+700 2.70 1.00 20.00 54.00
RETAINING WALL EXCAVATION
0+970 1.25 1.00 - -
0+980 1.25 1.00 10.00 12.50
1+000 1.25 1.00 20.00 25.00
1+020 1.25 1.00 20.00 25.00
1+040 1.25 1.00 20.00 25.00
1+050 1.25 1.00 10.00 12.50
CONSTRUCTION BREAK
1+110 1.25 1.00 - -
1+120 1.25 1.00 10.00 12.50
1+130 1.25 1.00 10.00 12.50
CONSTRUCTION OVER TYPE (L/R)
1+130 2.50 1.00 - -
1+140 2.50 1.00 10.00 25.00
1+150 2.50 1.00 10.00 25.00
CONSTRUCTION OVER TYPE (R)
1+150 1.25 1.00 - -
1+160 1.25 1.00 10.00 12.50
1+170 1.25 1.00 10.00 12.50
1+180 1.25 1.00 10.00 12.50
1+190 1.25 1.00 10.00 12.50
1+200 1.25 1.00 10.00 12.50
1+210 1.25 1.00 10.00 12.50
1+220 1.25 1.00 10.00 12.50
1+230 1.25 1.00 10.00 12.50
SUBTOTAL 545.00 cu.m.
Section Area (sq.m.)
Station Length Volume (cu.m.) Remarks
Width (m) Height (m) (l.m.)
CONSTRUCTION BREAK
1+250 1.25 1.00 20.00 25.00
1+260 1.25 1.00 10.00 12.50
1+270 1.25 1.00 10.00 12.50
CONSTRUCTION OVER TYPE (L/R)
1+270 2.50 1.00 - -
1+280 2.50 1.00 10.00 25.00
1+290 2.50 1.00 10.00 25.00
CONSTRUCTION OVER TYPE (R)
1+290 1.25 1.00 - -
1+300 1.25 1.00 10.00 12.50
1+320 1.25 1.00 20.00 25.00
1+330 1.25 1.00 10.00 12.50
CONSTRUCTION BREAK
1+370 2.50 1.00 - -
1+380 2.50 1.00 10.00 25.00
1+400 2.50 1.00 20.00 50.00
1+420 2.50 1.00 20.00 50.00
1+440 2.50 1.00 20.00 50.00
1+460 2.50 1.00 20.00 50.00
1+480 2.50 1.00 20.00 50.00
1+500 2.50 1.00 20.00 50.00
1+510 2.50 1.00 10.00 25.00
CONSTRUCTION BREAK
1+530 1.25 1.00 - -
1+540 1.25 1.00 10.00 12.50
1+550 1.25 1.00 10.00 12.50
CONSTRUCTION OVER TYPE (L/R)
1+550 2.50 1.00 - -
1+560 2.50 1.00 10.00 25.00
1+580 2.50 1.00 20.00 50.00
1+590 2.50 1.00 10.00 25.00
CONSTRUCTION OVER TYPE (R)
1+590 1.25 1.00 - -
1+600 1.25 1.00 10.00 12.50
1+610 1.25 1.00 10.00 12.50
CONSTRUCTION OVER TYPE (L/R)
1+550 2.50 1.00 - -
1+560 2.50 1.00 10.00 25.00
1+580 2.50 1.00 20.00 50.00
1+600 2.50 1.00 20.00 50.00
1+620 2.50 1.00 20.00 50.00
1+640 2.50 1.00 20.00 50.00
1+660 2.50 1.00 20.00 50.00
1+680 2.50 1.00 20.00 50.00
1+700 2.50 1.00 20.00 50.00
1+720 2.50 1.00 20.00 50.00
1+730 2.50 1.00 10.00 25.00
SUBTOTAL 1,100.00 cu.m.
Section Area (sq.m.)
Station Length Volume (cu.m.) Remarks
Width (m) Height (m) (l.m.)
CONSTRUCTION BREAK
2+430 1.25 1.00 - -
2+440 1.25 1.00 10.00 12.50
2+460 1.25 1.00 20.00 25.00
2+480 1.25 1.00 20.00 25.00
2+500 1.25 1.00 20.00 25.00
2+510 1.25 1.00 10.00 12.50
CONSTRUCTION BREAK
2+610 1.25 1.00 - -
2+620 1.25 1.00 10.00 12.50
2+640 1.25 1.00 20.00 25.00
2+660 1.25 1.00 20.00 25.00
2+680 1.25 1.00 20.00 25.00
2+700 1.25 1.00 20.00 25.00
2+720 1.25 1.00 20.00 25.00
2+740 1.25 1.00 20.00 25.00
2+760 1.25 1.00 20.00 25.00
2+780 1.25 1.00 20.00 25.00
2+800 1.25 1.00 20.00 25.00
2+820 1.25 1.00 20.00 25.00
2+840 1.25 1.00 20.00 25.00
2+850 1.25 1.00 10.00 12.50
CONSTRUCTION BREAK
2+870 1.25 1.00 - -
2+880 1.25 1.00 10.00 12.50
2+900 1.25 1.00 20.00 25.00
2+910 1.25 1.00 10.00 12.50
CONSTRUCTION BREAK
3+110 1.25 1.00 - -
3+120 1.25 1.00 10.00 12.50
3+130 1.25 1.00 10.00 12.50
CONSTRUCTION OVER TYPE (L/R)
3+130 2.50 1.00 - -
3+140 2.50 1.00 10.00 25.00
3+150 2.50 1.00 10.00 25.00
CONSTRUCTION BREAK
3+190 1.25 1.00 - -
3+200 1.25 1.00 10.00 12.50
3+220 1.25 1.00 20.00 25.00
3+240 1.25 1.00 20.00 25.00
3+250 1.25 1.00 10.00 12.50
SUBTOTAL 600.00 cu.m.
TOTAL 4,560.50 cu.m.
Submitted by,
Grupo Imprezario Cailaco Oan Checked by, Verified by,
Fernao Soares Reis, ST Eng. Santino Barreto Eng. Rogerio da Costa Freitas
Tecnico Tecnico DN EPCC Chefe Sec. Apoio Tecnico
REPÚBLICA DEMOCRÁTICA DE TIMOR LESTE
REHABILITAÇÃO DE ESTRADAS
MINISTÉRIO DAS OBRAS PÚBLICAS
BACK UP QUANTITY
Section Area (sq.m.)
Station Distance Volume (cu.m.) Remarks
Area per Section Average Area (l.m.)
0+900 0.71
0+920 - 0.35 20.00 7.08
0+940 - - 20.00 -
0+960 0.28 0.14 20.00 2.79
0+980 5.68 2.98 20.00 59.60
1+000 15.15 10.42 20.00 208.35
1+020 17.16 16.16 20.00 323.17
1+040 6.93 12.04 20.00 240.88
1+060 - 3.46 20.00 69.25
1+080 0.23 0.11 20.00 2.26
1+100 6.50 3.36 20.00 67.24
1+120 13.63 10.06 20.00 201.25
1+140 10.93 12.28 20.00 245.55
1+160 7.82 9.37 20.00 187.47
1+180 8.58 8.20 20.00 163.99
1+200 5.33 6.96 20.00 139.13
1+220 3.18 4.26 20.00 85.11
1+240 1.97 2.57 20.00 51.49
1+260 7.49 4.73 20.00 94.65
1+280 14.06 10.78 20.00 215.54
1+300 11.32 12.69 20.00 253.82
1+320 3.13 7.23 20.00 144.53
1+340 0.05 1.59 20.00 31.82
1+360 2.48 1.27 20.00 25.33
1+380 9.58 6.03 20.00 120.57
1+400 17.12 13.35 20.00 266.96
1+420 24.57 20.85 20.00 416.95
1+440 31.99 28.28 20.00 565.68
1+460 34.83 33.41 20.00 668.24
1+480 19.46 27.15 20.00 542.94
1+500 10.01 14.74 20.00 294.78
1+520 1.17 5.59 20.00 111.82
1+540 6.16 3.66 20.00 73.28
SUBTOTAL 5,881.52 cu.m.
Section Area (sq.m.)
Station Distance Volume (cu.m.) Remarks
Area per Section Average Area (l.m.)
Fernao Soares Reis, ST Eng. Santino Barreto Eng. Rogerio da Costa Freitas
Tecnico Tecnico DN EPCC Chefe Sec. Apoio Tecnico
REPÚBLICA DEMOCRÁTICA DE TIMOR LESTE
REHABILITAÇÃO DE ESTRADAS
MINISTÉRIO DAS OBRAS PÚBLICAS
BACK UP QUANTITY
Width (l.m.)
Station Distance Area (sq.m.) Remarks
Width per Section Average Width (l.m.)
0+900 8.00
0+920 8.00 8.00 20.00 160.00
0+940 8.00 8.00 20.00 160.00
0+960 8.00 8.00 20.00 160.00
0+980 8.00 8.00 20.00 160.00
1+000 8.00 8.00 20.00 160.00
1+020 8.00 8.00 20.00 160.00
1+040 8.00 8.00 20.00 160.00
1+060 8.00 8.00 20.00 160.00
1+080 8.00 8.00 20.00 160.00
1+100 8.00 8.00 20.00 160.00
1+120 8.00 8.00 20.00 160.00
1+140 8.00 8.00 20.00 160.00
1+160 8.00 8.00 20.00 160.00
1+180 8.00 8.00 20.00 160.00
1+200 8.00 8.00 20.00 160.00
1+220 8.00 8.00 20.00 160.00
1+240 8.00 8.00 20.00 160.00
1+260 8.00 8.00 20.00 160.00
1+280 8.00 8.00 20.00 160.00
1+300 8.00 8.00 20.00 160.00
1+320 8.00 8.00 20.00 160.00
1+340 8.00 8.00 20.00 160.00
1+360 8.00 8.00 20.00 160.00
1+380 8.00 8.00 20.00 160.00
1+400 8.00 8.00 20.00 160.00
1+420 8.00 8.00 20.00 160.00
1+440 8.00 8.00 20.00 160.00
1+460 8.00 8.00 20.00 160.00
1+480 8.00 8.00 20.00 160.00
1+500 8.00 8.00 20.00 160.00
1+520 8.00 8.00 20.00 160.00
1+540 8.00 8.00 20.00 160.00
SUBTOTAL 5,120.00 sq.m.
Width (l.m.)
Station Distance Area (sq.m.) Remarks
Width per Section Average Width (l.m.)
Fernao Soares Reis, ST Eng. Santino Barreto Eng. Rogerio da Costa Freitas
Tecnico Tecnico DN EPCC Chefe Sec. Apoio Tecnico
REPÚBLICA DEMOCRÁTICA DE TIMOR LESTE
REHABILITAÇÃO DE ESTRADAS
MINISTÉRIO DAS OBRAS PÚBLICAS
BACK UP QUANTITY
Section Area (sq.m.)
Station Distance Volume (cu.m.) Remarks
Area per Section Average Area (l.m.)
0+900 2.50
0+920 2.50 2.50 20.00 50.00
0+940 2.50 2.50 20.00 50.00
0+960 2.50 2.50 20.00 50.00
0+980 2.50 2.50 20.00 50.00
1+000 2.50 2.50 20.00 50.00
1+020 2.50 2.50 20.00 50.00
1+040 2.50 2.50 20.00 50.00
1+060 2.50 2.50 20.00 50.00
1+080 2.50 2.50 20.00 50.00
1+100 2.50 2.50 20.00 50.00
1+120 2.50 2.50 20.00 50.00
1+140 2.50 2.50 20.00 50.00
1+160 2.50 2.50 20.00 50.00
1+180 2.50 2.50 20.00 50.00
1+200 2.50 2.50 20.00 50.00
1+220 2.50 2.50 20.00 50.00
1+240 2.50 2.50 20.00 50.00
1+260 2.50 2.50 20.00 50.00
1+280 2.50 2.50 20.00 50.00
1+300 2.50 2.50 20.00 50.00
1+320 2.50 2.50 20.00 50.00
1+340 2.50 2.50 20.00 50.00
1+360 2.50 2.50 20.00 50.00
1+380 2.50 2.50 20.00 50.00
1+400 2.50 2.50 20.00 50.00
1+420 2.50 2.50 20.00 50.00
1+440 2.50 2.50 20.00 50.00
1+460 2.50 2.50 20.00 50.00
1+480 2.50 2.50 20.00 50.00
1+500 2.50 2.50 20.00 50.00
1+520 2.50 2.50 20.00 50.00
1+540 2.50 2.50 20.00 50.00
SUBTOTAL 1,600.00 cu.m.
Section Area (sq.m.)
Station Distance Volume (cu.m.) Remarks
Area per Section Average Area (l.m.)
Fernao Soares Reis, ST Eng. Santino Barreto Eng. Rogerio da Costa Freitas
Tecnico Tecnico DN EPCC Chefe Sec. Apoio Tecnico
REPÚBLICA DEMOCRÁTICA DE TIMOR LESTE
REHABILITAÇÃO DE ESTRADAS
MINISTÉRIO DAS OBRAS PÚBLICAS
BACK UP QUANTITY
Section Area (sq.m.)
Station Distance Volume (cu.m.) Remarks
Area per Section Average Area (l.m.)
0+900 1.20
0+920 1.20 1.20 20.00 24.00
0+940 1.20 1.20 20.00 24.00
0+960 1.20 1.20 20.00 24.00
0+980 1.20 1.20 20.00 24.00
1+000 1.20 1.20 20.00 24.00
1+020 1.20 1.20 20.00 24.00
1+040 1.20 1.20 20.00 24.00
1+060 1.20 1.20 20.00 24.00
1+080 1.20 1.20 20.00 24.00
1+100 1.20 1.20 20.00 24.00
1+120 1.20 1.20 20.00 24.00
1+140 1.20 1.20 20.00 24.00
1+160 1.20 1.20 20.00 24.00
1+180 1.20 1.20 20.00 24.00
1+200 1.20 1.20 20.00 24.00
1+220 1.20 1.20 20.00 24.00
1+240 1.20 1.20 20.00 24.00
1+260 1.20 1.20 20.00 24.00
1+280 1.20 1.20 20.00 24.00
1+300 1.20 1.20 20.00 24.00
1+320 1.20 1.20 20.00 24.00
1+340 1.20 1.20 20.00 24.00
1+360 1.20 1.20 20.00 24.00
1+380 1.20 1.20 20.00 24.00
1+400 1.20 1.20 20.00 24.00
1+420 1.20 1.20 20.00 24.00
1+440 1.20 1.20 20.00 24.00
1+460 1.20 1.20 20.00 24.00
1+480 1.20 1.20 20.00 24.00
1+500 1.20 1.20 20.00 24.00
1+520 1.20 1.20 20.00 24.00
1+540 1.20 1.20 20.00 24.00
SUBTOTAL 768.00 cu.m.
Section Area (sq.m.)
Station Distance Volume (cu.m.) Remarks
Area per Section Average Area (l.m.)
Fernao Soares Reis, ST Eng. Santino Barreto Eng. Rogerio da Costa Freitas
Tecnico Tecnico DN EPCC Chefe Sec. Apoio Tecnico
REPÚBLICA DEMOCRÁTICA DE TIMOR LESTE
REHABILITAÇÃO DE ESTRADAS
MINISTÉRIO DAS OBRAS PÚBLICAS
BACK UP QUANTITY
Section Area (sq.m.)
Station Distance Volume (sq.m.) Remarks
Width per Section Average Width (l.m.)
0+900 6.10
0+920 6.10 6.10 20.00 122.00
0+940 6.10 6.10 20.00 122.00
0+960 6.10 6.10 20.00 122.00
0+980 6.10 6.10 20.00 122.00
1+000 6.10 6.10 20.00 122.00
1+020 6.10 6.10 20.00 122.00
1+040 6.10 6.10 20.00 122.00
1+060 6.10 6.10 20.00 122.00
1+080 6.10 6.10 20.00 122.00
1+100 6.10 6.10 20.00 122.00
1+120 6.10 6.10 20.00 122.00
1+140 6.10 6.10 20.00 122.00
1+160 6.10 6.10 20.00 122.00
1+180 6.10 6.10 20.00 122.00
1+200 6.10 6.10 20.00 122.00
1+220 6.10 6.10 20.00 122.00
1+240 6.10 6.10 20.00 122.00
1+260 6.10 6.10 20.00 122.00
1+280 6.10 6.10 20.00 122.00
1+300 6.10 6.10 20.00 122.00
1+320 6.10 6.10 20.00 122.00
1+340 6.10 6.10 20.00 122.00
1+360 6.10 6.10 20.00 122.00
1+380 6.10 6.10 20.00 122.00
1+400 6.10 6.10 20.00 122.00
1+420 6.10 6.10 20.00 122.00
1+440 6.10 6.10 20.00 122.00
1+460 6.10 6.10 20.00 122.00
1+480 6.10 6.10 20.00 122.00
1+500 6.10 6.10 20.00 122.00
1+520 6.10 6.10 20.00 122.00
1+540 6.10 6.10 20.00 122.00
SUBTOTAL 3,904.00 sq.m
Section Area (sq.m.)
Station Distance Volume (sq.m.) Remarks
Width per Section Average Width (l.m.)
Fernao Soares Reis, ST Eng. Santino Barreto Eng. Rogerio da Costa Freitas
Tecnico Tecnico DN EPCC Chefe Sec. Apoio Tecnico
REPÚBLICA DEMOCRÁTICA DE TIMOR LESTE
REHABILITAÇÃO DE ESTRADAS
MINISTÉRIO DAS OBRAS PÚBLICAS
BACK UP QUANTITY
Section Area (sq.m.)
Station Distance Volume (sq.m.) Remarks
Width per Section Average Width (l.m.)
0+900 6.00
0+920 6.00 6.00 20.00 120.00
0+940 6.00 6.00 20.00 120.00
0+960 6.00 6.00 20.00 120.00
0+980 6.00 6.00 20.00 120.00
1+000 6.00 6.00 20.00 120.00
1+020 6.00 6.00 20.00 120.00
1+040 6.00 6.00 20.00 120.00
1+060 6.00 6.00 20.00 120.00
1+080 6.00 6.00 20.00 120.00
1+100 6.00 6.00 20.00 120.00
1+120 6.00 6.00 20.00 120.00
1+140 6.00 6.00 20.00 120.00
1+160 6.00 6.00 20.00 120.00
1+180 6.00 6.00 20.00 120.00
1+200 6.00 6.00 20.00 120.00
1+220 6.00 6.00 20.00 120.00
1+240 6.00 6.00 20.00 120.00
1+260 6.00 6.00 20.00 120.00
1+280 6.00 6.00 20.00 120.00
1+300 6.00 6.00 20.00 120.00
1+320 6.00 6.00 20.00 120.00
1+340 6.00 6.00 20.00 120.00
1+360 6.00 6.00 20.00 120.00
1+380 6.00 6.00 20.00 120.00
1+400 6.00 6.00 20.00 120.00
1+420 6.00 6.00 20.00 120.00
1+440 6.00 6.00 20.00 120.00
1+460 6.00 6.00 20.00 120.00
1+480 6.00 6.00 20.00 120.00
1+500 6.00 6.00 20.00 120.00
1+520 6.00 6.00 20.00 120.00
1+540 6.00 6.00 20.00 120.00
SUBTOTAL 3,840.00 sq.m
Section Area (sq.m.)
Station Distance Volume (sq.m.) Remarks
Width per Section Average Width (l.m.)
Fernao Soares Reis, ST Eng. Santino Barreto Eng. Rogerio da Costa Freitas
Tecnico Tecnico DN EPCC Chefe Sec. Apoio Tecnico
REPÚBLICA DEMOCRÁTICA DE TIMOR LESTE
REHABILITAÇÃO DE ESTRADAS
MINISTÉRIO DAS OBRAS PÚBLICAS
BACK UP QUANTITY
TOTAL= 6,577.34 kg
Submitted by,
Grupo Imprezario Cailaco Oan Checked by, Verified by,
Fernao Soares Reis, ST Eng. Santino Barreto Eng. Rogerio da Costa Freitas
Tecnico Tecnico DN EPCC Chefe Sec. Apoio Tecnico
REPÚBLICA DEMOCRÁTICA DE TIMOR LESTE
REHABILITAÇÃO DE ESTRADAS
MINISTÉRIO DAS OBRAS PÚBLICAS, TRANSPORTES E COMUNICAÇÕES
BACK UP QUANTITY
Submitted by,
Grupo Imprezario Cailaco Oan Checked by, Verified by,
Fernao Soares Reis, ST Eng. Santino Barreto Eng. Rogerio da Costa Freitas
Tecnico Tecnico DN EPCC Chefe Sec. Apoio Tecnico
REPÚBLICA DEMOCRÁTICA DE TIMOR LESTE
REHABILITAÇÃO DE ESTRADAS
MINISTÉRIO DAS OBRAS PÚBLICAS, TRANSPORTES E COMUNICAÇÕES
BACK UP QUANTITY
Submitted by,
Grupo Imprezario Cailaco Oan Checked by, Verified by,
Fernao Soares Reis, ST Eng. Santino Barreto Eng. Rogerio da Costa Freitas
Tecnico Tecnico DN EPCC Chefe Sec. Apoio Tecnico
REPÚBLICA DEMOCRÁTICA DE TIMOR LESTE
REHABILITAÇÃO DE ESTRADAS
MINISTÉRIO DAS OBRAS PÚBLICAS
BACK UP QUANTITY
Submitted by,
Grupo Imprezario Cailaco Oan Checked by, Verified by,
Fernao Soares Reis, ST Eng. Santino Barreto Eng. Rogerio da Costa Freitas
Tecnico Tecnico DN EPCC Chefe Sec. Apoio Tecnico
REPÚBLICA DEMOCRÁTICA DE TIMOR LESTE
REHABILITAÇÃO DE ESTRADAS
MINISTÉRIO DAS OBRAS PÚBLICAS
BACK UP QUANTITY
Section Area (sq.m.)
Station Length Volume (cu.m.) Remarks
Thick (m) Height (m) (l.m.)
CONSTRUCTION BREAK
1+770 1.70 - -
1+780 1.70 10.00 17.00
1+790 1.70 10.00 17.00
CONSTRUCTION BREAK
2+150 0.85 - -
2+160 0.85 10.00 8.50
2+180 0.85 20.00 17.00
2+200 0.85 20.00 17.00
2+210 0.85 10.00 8.50
CONSTRUCTION BREAK
2+410 0.85 - -
2+420 0.85 10.00 8.50
2+430 0.85 10.00 8.50
CONSTRUCTION BREAK
2+510 0.85 - -
2+520 0.85 10.00 8.50
2+540 0.85 20.00 17.00
2+560 0.85 20.00 17.00
2+580 0.85 20.00 17.00
2+600 0.85 20.00 17.00
2+610 0.85 10.00 8.50
CONSTRUCTION BREAK
2+750 0.85 - -
2+760 0.85 10.00 8.50
2+780 0.85 20.00 17.00
2+800 0.85 20.00 17.00
2+820 0.85 20.00 17.00
2+840 0.85 20.00 17.00
2+850 0.85 10.00 8.50
CONSTRUCTION BREAK
3+050 1.70 - -
3+060 1.70 10.00 17.00
3+070 1.70 10.00 17.00
CONSTRUCTION BREAK
3+330 0.85 - -
3+340 0.85 10.00 8.50
3+360 0.85 20.00 17.00
3+380 0.85 20.00 17.00
3+400 0.85 20.00 17.00
3+410 0.85 10.00 8.50
CONSTRUCTION OVER TYPE (L/R)
3+410 1.70 - -
3+420 1.70 10.00 17.00
3+430 1.70 10.00 17.00
SUBTOTAL 408.00 cu.m.
Section Area (sq.m.)
Station Length Volume (cu.m.) Remarks
Thick (m) Height (m) (l.m.)
CONSTRUCTION BREAK
3+470 0.85 - -
3+480 0.85 10.00 8.50
3+490 0.85 10.00 8.50
CONSTRUCTION OVER TYPE (L/R)
3+490 1.70 - -
3+500 1.70 10.00 17.00
3+510 1.70 10.00 17.00
CONSTRUCTION BREAK
3+550 1.70 - -
3+560 1.70 10.00 17.00
3+570 1.70 10.00 17.00
CONSTRUCTION OVER TYPE (L)
3+570 0.85 - -
3+580 0.85 10.00 8.50
3+590 0.85 10.00 8.50
CONSTRUCTION BREAK
3+650 0.85 - -
3+660 0.85 10.00 8.50
3+670 0.85 10.00 8.50
CONSTRUCTION OVER TYPE (L/R)
3+670 1.70 - -
3+680 1.70 10.00 17.00
3+700 1.70 20.00 34.00
STONE MASONRY FOR RETAINING WALL
0+970 2.13 - -
0+980 2.13 10.00 21.25
1+000 2.13 20.00 42.50
1+020 2.13 20.00 42.50
1+040 2.13 20.00 42.50
1+050 2.13 10.00 21.25
CONSTRUCTION BREAK
1+110 2.13 - -
1+120 2.13 10.00 21.25
1+130 2.13 10.00 21.25
CONSTRUCTION OVER TYPE (L/R)
1+130 4.25 - -
1+140 4.25 10.00 42.50
1+150 4.25 10.00 42.50
CONSTRUCTION OVER TYPE (R)
1+150 2.13 - -
1+160 2.13 10.00 21.25
1+170 2.13 10.00 21.25
1+180 2.13 10.00 21.25
1+190 2.13 10.00 21.25
1+200 2.13 10.00 21.25
1+210 2.13 10.00 21.25
1+220 2.13 10.00 21.25
1+230 2.13 10.00 21.25
SUBTOTAL 637.50 cu.m.
Section Area (sq.m.)
Station Length Volume (cu.m.) Remarks
Thick (m) Height (m) (l.m.)
CONSTRUCTION BREAK
1+250 2.13 - -
1+260 2.13 10.00 21.25
1+270 2.13 10.00 21.25
CONSTRUCTION OVER TYPE (L/R)
1+270 4.25 - -
1+280 4.25 10.00 42.50
1+290 4.25 10.00 42.50
CONSTRUCTION OVER TYPE (R)
1+290 2.13 - -
1+300 2.13 10.00 21.25
1+320 2.13 20.00 42.50
1+330 2.13 10.00 21.25
CONSTRUCTION BREAK
1+370 4.25 - -
1+380 4.25 10.00 42.50
1+400 4.25 20.00 85.00
1+420 4.25 20.00 85.00
1+440 4.25 20.00 85.00
1+460 4.25 20.00 85.00
1+480 4.25 20.00 85.00
1+500 4.25 20.00 85.00
1+510 4.25 10.00 42.50
CONSTRUCTION BREAK
1+530 2.13 - -
1+540 2.13 10.00 21.25
1+550 2.13 10.00 21.25
CONSTRUCTION OVER TYPE (L/R)
1+550 4.25 - -
1+560 4.25 10.00 42.50
1+580 4.25 20.00 85.00
1+590 4.25 10.00 42.50
CONSTRUCTION OVER TYPE (R)
1+590 2.13 - -
1+600 2.13 10.00 21.25
1+610 2.13 10.00 21.25
CONSTRUCTION OVER TYPE (L/R)
1+550 4.25 - -
1+560 4.25 10.00 42.50
1+580 4.25 20.00 85.00
1+600 4.25 20.00 85.00
1+620 4.25 20.00 85.00
1+640 4.25 20.00 85.00
1+660 4.25 20.00 85.00
1+680 4.25 20.00 85.00
1+700 4.25 20.00 85.00
1+720 4.25 20.00 85.00
1+730 4.25 10.00 42.50
SUBTOTAL 1,827.50 cu.m.
Section Area (sq.m.)
Station Length Volume (cu.m.) Remarks
Thick (m) Height (m) (l.m.)
CONSTRUCTION BREAK
2+430 2.13 - -
2+440 2.13 10.00 21.25
2+460 2.13 20.00 42.50
2+480 2.13 20.00 42.50
2+500 2.13 20.00 42.50
2+510 2.13 10.00 21.25
CONSTRUCTION BREAK
2+610 2.13 - -
2+620 2.13 10.00 21.25
2+640 2.13 20.00 42.50
2+660 2.13 20.00 42.50
2+680 2.13 20.00 42.50
2+700 2.13 20.00 42.50
2+720 2.13 20.00 42.50
2+740 2.13 20.00 42.50
2+760 2.13 20.00 42.50
2+780 2.13 20.00 42.50
2+800 2.13 20.00 42.50
2+820 2.13 20.00 42.50
2+840 2.13 20.00 42.50
2+850 2.13 10.00 21.25
CONSTRUCTION BREAK
2+870 2.13 - -
2+880 2.13 10.00 21.25
2+900 2.13 20.00 42.50
2+910 2.13 10.00 21.25
CONSTRUCTION BREAK
3+110 2.13 - -
3+120 2.13 10.00 21.25
3+130 2.13 10.00 21.25
CONSTRUCTION OVER TYPE (L/R)
3+130 4.25 - -
3+140 4.25 10.00 42.50
3+150 4.25 10.00 42.50
CONSTRUCTION BREAK
3+190 2.13 - -
3+200 2.13 10.00 21.25
3+220 2.13 20.00 42.50
3+240 2.13 20.00 42.50
3+250 2.13 10.00 21.25
SUBTOTAL 1,020.00 cu.m.
TOTAL 5,960.00 cu.m.
Submitted by,
Grupo Imprezario Cailaco Oan Checked by, Verified by,
Fernao Soares Reis, ST Eng. Santino Barreto Eng. Rogerio da Costa Freitas
Tecnico Tecnico DN EPCC Chefe Sec. Apoio Tecnico
Democratic Republic of Timor Leste
Ministry of Public Works
Directorate General for Public Works
Directorate of Roads, Bridges and Flood Control
REF . NO. QTY. PRICE COMPONENT UNIT NO. OF HR. HOURLY AMOUNT
RATE
A. EQUIPMENT
E4 1 Wheel Loader, 1.80 cu.m hr 5 70.00 350.00
E7 1 Hydraulic Excavator, 0.90 cu.m. hr 5 80.00 400.00
E8 1 Motor Grader, 125HP hr 5 80.00 400.00
E9 1 Truck Mounted Crane, 11-15T hr 5 50.00 250.00
E15 1 Transit Mixer, 5.00-6.00 cu.m. hr 5 100.00 500.00
E17 5 Concrete Mixer, 1-bagger hr 1.25 10.00 62.50
E19 1 Concrete Vibrator hr 0.5 7.00 3.50
E22 1 Asphalt Paver/Finisher, 4.0m width hr 5 120.00 600.00
E24 1 Asphalt Distributor, 1,330 gal. hr 5 20.00 100.00
E26 1 Pneumatic Tired Roller, 10T hr 5 60.00 300.00
E26a 1 Vibratory Drum Roller hr 5 55.00 275.00
E26b 1 Three-Wheeled Tandem Roller hr 5 40.00 200.00
E27 1 Vibratory Plate Compractor, 7HP hr 5 10.00 50.00
E28 1 Tamping Rammer 7 HP hr 5 10.00 50.00
E29 1 Mobile Air Compressor, 456-500 cfm hr 5 30.00 150.00
E33 0 Pneumatic Breaker/jack hammer (hand held) hr 1 15.00 -
E33b 1 Chain Saw hr 0.5 40.00 20.00
E34 4 Dump Truck, 3.00-5.99 cu.m. hr 5 15.00 300.00
E37 1 Water Tank Truck with Pump, 500-1,000 gal hr 5 30.00 150.00
E39 1 Cargo Truck, 2.5T hr 5 25.00 125.00
E40 1 Cargo Truck, 9.00-10.00T hr 5 30.00 150.00
E40a 1 Low Bed Trailer hr 5 35.00 175.00
TOTAL A 4,611.00
TOTAL B 11,800.00
TOTAL A + B 16,411.00
C. UNIT COST = ( A + B )/Output per hour 16,411.00
REF. NO. TEMPORARY WORKS UNIT QUANTITY UNIT COST AMOUNT
D. TEMPORARY WORKS
1 Temporaray Access Road lump sum 1 500.00 500.00
TOTAL D 500.00
REF . NO. QTY. PRICE COMPONENT UNIT NO. OF HR. HOURLY AMOUNT
RATE
A. EQUIPMENT
E4 1 Wheel Loader, 1.80 cu.m hr 5 70.00 350.00
E7 1 Hydraulic Excavator, 0.90 cu.m. hr 5 80.00 400.00
E8 1 Motor Grader, 125HP hr 5 80.00 400.00
E9 1 Truck Mounted Crane, 11-15T hr 5 50.00 250.00
E15 1 Transit Mixer, 5.00-6.00 cu.m. hr 5 100.00 500.00
E17 5 Concrete Mixer, 1-bagger hr 1.25 10.00 62.50
E19 1 Concrete Vibrator hr 0.5 7.00 3.50
E22 1 Asphalt Paver/Finisher, 4.0m width hr 5 120.00 600.00
E24 1 Asphalt Distributor, 1,330 gal. hr 5 20.00 100.00
E26 1 Pneumatic Tired Roller, 10T hr 5 60.00 300.00
E26a 1 Vibratory Drum Roller hr 5 55.00 275.00
E26b 1 Three-Wheeled Tandem Roller hr 5 40.00 200.00
E27 1 Vibratory Plate Compractor, 7HP hr 5 10.00 50.00
E28 1 Tamping Rammer 7 HP hr 5 10.00 50.00
E29 1 Mobile Air Compressor, 456-500 cfm hr 5 30.00 150.00
E33 0 Pneumatic Breaker/jack hammer (hand held) hr 1 15.00 -
E33b 1 Chain Saw hr 0.5 40.00 20.00
E34 4 Dump Truck, 3.00-5.99 cu.m. hr 5 15.00 300.00
E37 1 Water Tank Truck with Pump, 500-1,000 gal hr 5 30.00 150.00
E39 1 Cargo Truck, 2.5T hr 5 25.00 125.00
E40 1 Cargo Truck, 9.00-10.00T hr 5 30.00 150.00
E40a 1 Low Bed Trailer hr 5 35.00 175.00
TOTAL A 4,611.00
TOTAL B 1,000.00
TOTAL A + B 5,611.00
C. UNIT COST = ( A + B )/Output per hour 5,611.00
REF. NO. TEMPORARY WORKS UNIT QUANTITY UNIT COST AMOUNT
D. TEMPORARY WORKS
1 Removal of Temporaray Works lump sum 1 500.00 500.00
TOTAL D 500.00
E. ESTIMATE DIRECT (EDC) = C + D 6,111.00
F. TOTAL UNIT COST 6,111.00
Democratic Republic of Timor Leste
Ministry of Public Works, Transportation and Comunication
Directorate General for Public Works
Directorate of Roads, Bridges and Flood Control
TOTAL A 530.00
TOTAL D 6,960.0000
TOTAL A 720.00
B. WORKER SAFETY
1 Work Vest pcs 30 5.00 150.00
1 Work Helm pcs 30 2.50 75.00
1 Drugs ( P3K ) box 4 15.00 60.00
1 Cost of Work Accidents month 36 50.00 1,800.00
TOTAL B 2,085.00
TOTAL A + B 2,805.00
C. UNIT COST = ( A + B )/Output per component 2,805.00
TOTAL D -
A. FIELD SURVEY
1 Road Condition km 1 40.00 40.00
1 Fixing of BM and TBM pcs 5 15.00 75.00
TOTAL A 115.00
B. TOPO SURVEY
1 Topography and Long Sectioan km 1 500.00 500.00
1 Cross Section profile 50 10.00 500.00
TOTAL B 1,000.00
TOTAL A + B 1,115.00
C. UNIT COST = ( A + B )/Output per component 1,115.00
TOTAL D 1,100.0000
TOTAL A 82.69
B. LABOR
L2 1 Leadman hr 0.5 1.68 0.84
L11 3 Unskilled Laborer hr 0.5 0.72 1.08
TOTAL B 1.92
TOTAL A + B 84.61
C. UNIT COST = ( A + B )/Output per hour 84.61
TOTAL D -
TOTAL A 124.04
B. LABOR
L2 1 Leadman hr 0.75 1.68 1.26
L11 3 Unskilled Laborer hr 0.75 0.72 1.62
TOTAL B 2.88
TOTAL A + B 126.91
C. UNIT COST = ( A + B )/Output per hour 126.91
TOTAL D -
TOTAL A 180.00
B. LABOR
L2 1 Leadman hr 1 1.71 1.71
L11 3 Unskiled Laborer hr 1 0.71 2.14
TOTAL B 3.86
TOTAL A + B 183.86
C. UNIT COST = ( A + B )/Output per hour 1,237.96
TOTAL D -
TOTAL A 95.00
B. LABOR
L2 1 Leadman hr 1 1.71 1.71
L11 2 Unskiled Laborer hr 1 0.71 1.43
TOTAL B 3.14
TOTAL A + B 98.14
C. UNIT COST = ( A + B )/Output per hour 14.02
TOTAL D -
TOTAL A 95.00
B. LABOR
L2 1 Leadman hr 1 1.71 1.71
L11 2 Unskiled Laborer hr 1 0.71 1.43
TOTAL B 3.14
TOTAL A + B 98.14
C. UNIT COST = ( A + B )/Output per hour 115.46
TOTAL D -
TOTAL A 180.00
B. LABOR
L2 1 Leadman hr 1 1.71 1.71
L11 2 Unskiled Laborer hr 1 0.71 1.43
TOTAL B 3.14
TOTAL A + B 183.14
C. UNIT COST = ( A + B )/Output per hour 4.07
TOTAL D -
TOTAL A 180.00
B. LABOR
L2 1 Leadman hr 1 1.71 1.71
L11 2 Unskiled Laborer hr 1 0.71 1.43
TOTAL B 3.14
TOTAL A + B 183.14
C. UNIT COST = ( A + B )/Output per hour 4.07
TOTAL D -
TOTAL A 180.00
B. LABOR
L2 1 Leadman hr 1 1.71 1.71
L11 2 Unskiled Laborer hr 1 0.71 1.43
TOTAL B 3.14
TOTAL A + B 183.14
C. UNIT COST = ( A + B )/Output per hour 6.10
TOTAL D -
TOTAL A 180.00
B. LABOR
L2 1 Leadman hr 1 1.71 1.71
L11 2 Unskiled Laborer hr 1 0.71 1.43
TOTAL B 3.14
TOTAL A + B 183.14
C. UNIT COST = ( A + B )/Output per hour 4.58
TOTAL D -
TOTAL A 180.00
B. LABOR
L2 1 Leadman hr 1 1.71 1.71
L11 2 Unskiled Laborer hr 1 0.71 1.43
TOTAL B 3.14
TOTAL A + B 183.14
C. UNIT COST = ( A + B )/Output per hour 4.58
TOTAL D -
TOTAL A 180.00
B. LABOR
L2 1 Leadman hr 1 1.71 1.71
L11 1 Unskiled Laborer hr 1 0.71 0.71
TOTAL B 2.43
TOTAL A + B 182.43
C. UNIT COST = ( A + B )/Output per hour 4.56
TOTAL D -
TOTAL A 345.00
B. LABOR
L2 1 Leadman hr 1 1.71 1.71
L10 1 Skiled Laborer hr 1 1.14 1.14
L11 2 Unskiled Laborer hr 1 0.71 1.43
TOTAL B 4.29
TOTAL A + B 349.29
C. UNIT COST = ( A + B )/Output per hour 2.25
TOTAL D 7.20
TOTAL A 165.00
B. LABOR
L2 1 Leadman hr 1 1.71 1.71
L10 2 Skiled Laborer hr 1 1.14 2.29
L11 4 Unskiled Laborer hr 1 0.71 2.86
TOTAL B 6.86
TOTAL A + B 171.86
C. UNIT COST = ( A + B )/Output per hour 0.86
TOTAL D -
TOTAL A 165.00
B. LABOR
L2 1 Leadman hr 1 1.71 1.71
L10 2 Skiled Laborer hr 1 1.14 2.29
L11 4 Unskiled Laborer hr 1 0.71 2.86
TOTAL B 6.86
TOTAL A + B 171.86
C. UNIT COST = ( A + B )/Output per hour 1.72
TOTAL D -
TOTAL A 285.00
B. LABOR
L2 1 Leadman hr 1 1.71 1.71
L10 2 Skiled Laborer hr 1 1.14 2.29
L11 4 Unskiled Laborer hr 1 0.71 2.86
TOTAL B 6.86
TOTAL A + B 291.86
C. UNIT COST = ( A + B )/Output per hour 14.59
TOTAL D 34.50
TOTAL A 285.00
B. LABOR
L2 1 Leadman hr 1 1.71 1.71
L10 2 Skiled Laborer hr 1 1.14 2.29
L11 4 Unskiled Laborer hr 1 0.71 2.86
TOTAL B 6.86
TOTAL A + B 291.86
C. UNIT COST = ( A + B )/Output per hour 14.59
TOTAL D 60.00
TOTAL A 90.00
B. LABOR
L2 1 Leadman hr 1 1.71 1.71
L10 1 Skiled Laborer hr 1 1.14 1.14
L11 2 Unskiled Laborer hr 1 0.71 1.43
TOTAL B 4.29
TOTAL A + B 94.29
C. UNIT COST = ( A + B )/Output per hour 0.24
TOTAL D 2.28
TOTAL A 90.00
B. LABOR
L2 1 Leadman hr 1 1.71 1.71
L10 1 Skiled Laborer hr 1 1.14 1.14
L11 2 Unskiled Laborer hr 1 0.71 1.43
TOTAL B 4.29
TOTAL A + B 94.29
C. UNIT COST = ( A + B )/Output per hour 0.24
TOTAL D 2.50
TOTAL A 310.00
B. LABOR
1 Leadman hr 1 1.71 1.71
6 Skiled Laborer hr 1 1.14 6.86
6 Unskiled Laborer hr 1 0.71 4.29
TOTAL B 12.86
TOTAL A + B 322.86
C. UNIT COST = ( A + B )/Output per hour 1.96
TOTAL D 28.00
TOTAL A 310.00
B. LABOR
1 Leadman hr 1 1.71 1.71
6 Skiled Laborer hr 1 1.14 6.86
6 Unskiled Laborer hr 1 0.71 4.29
TOTAL B 12.86
TOTAL A + B 322.86
C. UNIT COST = ( A + B )/Output per hour 1.96
TOTAL D 42.00
TOTAL A 10.00
B. LABOR
L2 1 Leadman hr 1 1.71 1.71
L10 2 Skiled Laborer hr 1 1.14 2.29
L11 4 Unskiled Laborer hr 1 0.71 2.86
TOTAL B 6.86
TOTAL A + B 16.86
C. UNIT COST = ( A + B )/Output per hour 0.34
TOTAL D 1.55
TOTAL A 694.00
B. LABOR
L2 1 Leadman hr 1 1.71 1.71
L10 4 Skiled Laborer hr 1 1.14 4.57
L11 8 Unskiled Laborer hr 1 0.71 5.71
TOTAL B 12.00
TOTAL A + B 706.00
C. UNIT COST = ( A + B )/Output per hour 58.83
TOTAL D 160.00
TOTAL A 347.00
B. LABOR
L2 1 Leadman hr 1 1.71 1.71
L10 1 Skiled Laborer hr 1 1.14 1.14
L11 4 Unskiled Laborer hr 1 0.71 2.86
TOTAL B 5.71
TOTAL A + B 352.71
C. UNIT COST = ( A + B )/Output per hour 44.09
TOTAL D 107.00
TOTAL A 16.25
B. LABOR
L2 1 Leadman hr 1 1.71 1.71
L10 2 Skiled Laborer hr 1 1.14 2.29
L11 4 Unskiled Laborer hr 1 0.71 2.86
TOTAL B 6.86
TOTAL A + B 23.11
C. UNIT COST = ( A + B )/Output per hour 7.70
TOTAL D 347.08
TOTAL A 95.00
B. LABOR
L2 1 Leadman hr 1 1.71 1.71
L10 1 Skiled Laborer hr 1 1.14 1.14
L11 5 Unskiled Laborer hr 1 0.71 3.57
TOTAL B 6.43
TOTAL A + B 101.43
C. UNIT COST = ( A + B )/Output per hour 4.06
TOTAL D 7.20
TOTAL A 95.00
B. LABOR
L2 1 Leadman hr 1 1.71 1.71
L10 1 Skiled Laborer hr 1 1.14 1.14
L11 5 Unskiled Laborer hr 1 0.71 3.57
TOTAL B 6.43
TOTAL A + B 101.43
C. UNIT COST = ( A + B )/Output per hour 6.76
TOTAL D 10.00
TOTAL A 42.50
B. LABOR
L2 1 Leadman hr 1 1.71 1.71
L10 4 Skiled Laborer hr 1 1.14 4.57
L11 6 Unskiled Laborer hr 1 0.71 4.29
TOTAL B 10.57
TOTAL A + B 53.07
C. UNIT COST = ( A + B )/Output per hour 13.27
TOTAL D 69.00
TOTAL A 35.00
B. LABOR
L2 1 Leadman hr 1 1.71 1.71
L10 1 Skiled Laborer hr 1 1.14 1.14
L11 5 Unskiled Laborer hr 1 0.71 3.57
TOTAL B 6.43
TOTAL A + B 41.43
C. UNIT COST = ( A + B )/Output per hour 20.71
TOTAL D 46.50
TOTAL A 35.00
B. LABOR
L2 1 Leadman hr 1 1.71 1.71
L10 1 Skiled Laborer hr 1 1.14 1.14
L11 5 Unskiled Laborer hr 1 0.71 3.57
TOTAL B 6.43
TOTAL A + B 41.43
C. UNIT COST = ( A + B )/Output per hour 33.14
TOTAL D 151.11
TOTAL A 35.00
B. LABOR
L2 1 Leadman hr 1 1.71 1.71
L10 1 Skiled Laborer hr 1 1.14 1.14
L11 5 Unskiled Laborer hr 1 0.71 3.57
TOTAL B 6.43
TOTAL A + B 41.43
C. UNIT COST = ( A + B )/Output per hour 33.14
TOTAL D 151.11
TOTAL A 35.00
B. LABOR
L2 1 Leadman hr 1 1.71 1.71
L10 1 Skiled Laborer hr 1 1.14 1.14
L11 5 Unskiled Laborer hr 1 0.71 3.57
TOTAL B 6.43
TOTAL A + B 41.43
C. UNIT COST = ( A + B )/Output per hour 2.30
TOTAL D 13.51
TOTAL A 6.25
B. LABOR
L2 1 Leadman hr 1 1.71 1.71
L11 10 Unskiled Laborer hr 1 0.71 7.14
TOTAL B 8.86
TOTAL A + B 15.11
C. UNIT COST = ( A + B )/Output per hour 14.39
TOTAL D 266.88
TOTAL A 10.00
B. LABOR
L2 1 Leadman hr 1 1.71 1.71
L10 2 Skiled Laborer hr 1 1.14 2.29
L11 4 Unskiled Laborer hr 1 0.71 2.86
TOTAL B 6.86
TOTAL A + B 16.86
C. UNIT COST = ( A + B )/Output per hour 4.21
TOTAL D 30.00