PROJECT : CHENNAI METRO -


WASHERMANPET TO WIMCO NAGAR

CLIENT : M/s . CMRL

CONTRACTOR : M/s. NCC LIMITED

CONSULTANT : M/s. SYSTRA MVA


CONSULTING (INDIA) PVT.LTD
FLOOR EXPANSION JOINT
75 FP- Spec Sheet

Description Storage
75FP system is used where The materials should be stored in clean
minimal and aesthetically pleasing and dry place. The material should be
sightline is required. It consists of protected until the final inspection by the
Aluminum frame, support slide and architect and the contractor.
elastomeric seal with appropriate anchors
and fasteners.

Features Installation
1. Suitable for most floor finishes Expansion joint system shall be installed
2. Pedestrian loads only. in accordance with manufacturer’s
3. Available in wide range to installation procedure. Prior to installation
accommodate thickness of the expansion joint site shall be inspected.
floor.
4. Seals can be installed towards the The site must be kept clean and the joints
end and are also replaceable. should be uniform before the installation.
5. Seals are available in many colors. All the anchors and fasteners should be
6. Installation is very easy. placed with the appropriate material.

Material Warranty
Aluminum confirms to ASTM B221 Kantaflex-Balco (USA) warrants the
for extrusion alloy 6063 T5/T6. material to be free of defects in material
for a period of 5 years. Materials must be
Expansion/Contraction : +/- 25% Movement installed as per the approved installation
instructions.
Finish Kantaflex-Balco shall not be liable for any
injury, loss or damage arising out of the
All exposed aluminum is mill finish. use of the product.

Kantaflex India Private Limited


New No: 213, (Old No: 113), Prakasam Salai, Broadway Chennai - 600 108.
Ph: +91 44 25361242/25361462. Mail: kunal@kantaflex.in, website:www.kantaflex.in
Moisture Barrier- Spec Sheet

Description Storage
Moisture barrier system is used to prevent The materials should be stored in clean
water penetration from the expansion and dry place. The material should be
joints. The water collected in the moisture protected until the final inspection by the
barrier will evaporate from the joints. It is architect and the contractor.
applied using epoxy on top and bottom of
the edges.
Installation

Features Expansion joint system shall be installed


in accordance with manufacturer’s
1. Protects from water leakage. installation procedure. Prior to installation
2. Easy to install. expansion joint site shall be inspected.
3. Water evaporates from the expansion
joints. The site must be kept clean and the joints
4. Spout system available for draining should be uniform before the installation.
water. All the anchors and fasteners should be
5. Accommodates seismic movements. placed with the appropriate material.

Warranty
Material Kantaflex warrants the material to be free
Fibre Reinforced PVC Sheet: of defects in material for a period of five
Thickness - 0.41 mm years. Materials must be installed as per
Mass per area - 482.00 g/sq.m the approved installation instructions.
Ultimate water pressure - 90 psi Kantaflex-Balco shall not be liable for any
injury, loss or damage arising out of the
Finish use of the product.
Matt finish.

Kantaflex (India) Private Limited


No.9 Vasu street, Mathi towers. Kilpauk, Chennai-600 010. India.
Ph: +91 44 25321245/25321482. Mail: kanta@kantaflex.in, website: www.kantaflex.in
75FP-1-(1 x 2)
FLOOR TO FLOOR SYSTEM
EXTRUSION : 3 MTR LENGTH , COVER PLATE : 8 FEET
MILL FINISH ALUMINIUM BASE
APPROXIMATELY 25% MOVEMENT
PVC MOISTURE BARRIER
[27mm] FINISHED
FLOOR BY OTHERS
SCREED SEAL

ALUMINIUM FRAME
[50mm] (MILL FINISH)

[100mm]

8X80mm
SLEEVE ANCHOR
[50mm] @ 20" (508mm) C.C.
38mm

RCC RCC

MOISTURE
BARRIER

[25mm]

75FP-1-(1X2)
[FLOOR TO FLOOR EXPANSION JOINT - PEDESTRIAN]

PROJECT : CHENNAI METRO - WASHERMANPET TO WIMCO NAGAR RIGHTS OF DESIGN


The information contained herein is the KANTAFLEX (INDIA) PVT LTD.
CLIENT : M/s . CMRL
proprietary property of KANTAFLEX - #113 Broadway Main Road,
BALCO, INC. No portion of it may be Chennai - 600108 , India.
CONSULTANT : M/s. SYSTRA MVA CONSULTING (INDIA) PVT.LTD reproduced by any means or used in
any form except for the purpose for Telefax :
CONTRACTOR : M/s. NCC LIMITED. which it was furnished.All rights of the 044-25361242,25361462.
design and invention are hereby Mail : kunal@kantaflex.in
DRAWING NO : KFIPL/2019/75FP/3173 reserved.
www.kantaflex.in
DATE : 05.11.2019 DRAWN BY : T.M CKD BY : K.M SCALE : NTS
!"#$%&&%$!'"((
)*$+','&'-.(
INSTALLATION INSTRUCTION FOR
MOISTURE BARRIER
The following installation instructions are very important. Read them carefully, and be sure you
understand them completely before you begin any work.

INSTALLATION PROCEDURE:

STEP 1: SURFACE PREPARATION:

 Ensure the joint opening is formed to a uniform width for the entire length of the joint.
 Access to the bonding surface of the interface wall must be free and clear of debris. Any
obstructions must be accounted for in the installation process.

STEP 2: EPOXY APPLICATION


 Clean the surface neatly and apply epoxy on both sides.

Kantaflex India Private Limited


New No: 213, (Old No: 113), Prakasam Salai, Broadway Chennai - 600 108.
Ph: +91 44 25361242/25361462. Mail: Kunal@kantaflex.in, harsh@kantaflex.in, website: www.kantaflex.in
STEP 3: MOISTURE BARRIER INSTALLATION
 Place the moisture barrier on the epoxy applied surface appropriately as shown in image
below.

Kantaflex India Private Limited


New No: 213, (Old No: 113), Prakasam Salai, Broadway Chennai - 600 108.
Ph: +91 44 25361242/25361462. Mail: Kunal@kantaflex.in, harsh@kantaflex.in, website: www.kantaflex.in
INSTALLATION INSTRUCTIONS

2626 S. Sheridan • P.O. Box 17249 • Wichita, KS 67217


www.balcousa.com • 1-800-767-0082

INSTALLATION INSTRUCTIONS
FOR
7500 SERIES
EXPANSION JOINT COVERS

IMPORTANT
READ THE FOLLOWING BEFORE INSTALLING
Read the following installation instructions carefully, and be sure
you understand them completely before you begin any work.
Please note that these installation instructions are for stan-
dard installations and are not intended to replace any spe-
cific details or shop drawings that differ from those depicted.

© Balco Inc. All Rights Reserved XXXX0000 Rev. 00/00/14


INSTALLATION INSTRUCTIONS FOR 7500
SERIES EXPANSION JOINT COVERS

These installation instructions are for use in the instal- Blockouts are required for this installation. They can be
lation of 7500 Series Expansion Joint Cover Systems formed at the time of the initial concrete pour or at instal-
(Figure 1). lation time.

75FP
Interior Floor to Floor System

75FVP
Interior Wall to Floor System

75FVPE
Interior Wall to Floor System

75FVP-E
Interior New to Existing Floor System

Figure 1­­—7500 Series Expansion Joint Systems

2 XXXX0000 Rev. 00/00/14


INSTALLATION INSTRUCTIONS FOR 7500
SERIES EXPANSION JOINT COVERS

STORAGE SURFACE PREP


These expansion joint systems are shipped unassembled. Balco recommends that the concrete poured around joints
Store these products in a fully supported horizontal posi- and blockouts be vibrated before it is allowed to cure.
tion and in a clean, dry location.
Blockout Prep
CAUTION 1. Provide blockouts, in accordance with the ap-
All users should familiarize themselves with the proved shop drawings. Blockouts may be formed
MSDS information prior to the starting installation. at the time of the initial concrete poor or at a later
time by removing material from the slab.
NOTE
PROCEDURES
If a topping slab or pavers are to be used for the
PRE-INSTALLATION finished flooring, blockouts are not need for the
installation.
PARTS
• Base Member Subchannel NOTE
• Subchannel Fasteners Leave concrete forms in place in the blockout
until installation time to protect the area from
• Wall Member (75 FVP Only)
potential damage.
• Wall Member Fasteners (75 FVP-E Only)
• Center Plate 2. Inspect the blockouts to see that they are flat, level,
and clear of all debris.
• Face Seal
3. Test all concrete in and around the joint by tapping
the areas with a hammer. If the concrete sounds
TOOLS REQUIRED hollow, cracks, crumbles, or loosens, the concrete
This is a list of tools and materials recommended for use must be removed and repaired with a structural
in the installation of these expansion joint covers. Balco, repair mortar.
Inc. does not provide these tools and materials. 4. Use concrete saws and diamond grinding disks to
• Drill Bits for Base Members correct any deviation within the joint.
5. Access to the bonding surface of the interface walls
• Drill Bits for Anchors (Concrete) must be free and clear of debris. Any obstructions
• Electric Drill must be accounted for in the installation process.
• Sockets for Anchors 6. Measure the joint opening and verify that you have
the correct size for the joint (Figure 2).
• Levels
• Awls INTERFACE
WALL
• Tape Measure
• Masking Tape
• Phillips Bits (for Wall Members)
• Rubber Mallet WALL
• Wooden Block
JOINT
• Grout
Figure 2—Measuring the Joint Size

3 XXXX0000 Rev. 00/00/14


INSTALLATION INSTRUCTIONS FOR 7500
SERIES EXPANSION JOINT COVERS

NOTE Warning
A tooled edge on the corners of the concrete is CUTTING THE SEAL INTO SMALL
recommended. The radiused edge reduces the ef- LENGTHS CAN CAUSE LEAKS AND
fects of impact loading from vehicles and lessens WEAKEN THE SEAL.
the chance of edge erosion, cracking or spalling.
7500 Series Installation (except 75FVP and
7. Clean the interface walls of the concrete using a 75FVP-E)
50/50 mixture of water and Isopropyl alcohol to re-
move oil, grease, dirt, debris and other contaminants. 1. Place base members on a flat working surface
Ensure the water/alcohol is completely dried from the about the width of the face seal apart with the
cleaned surface prior to installation of the seal. channels facing each other.

NOTE 2 . Center plate only—Insert the center plate into both


supporting tracks, filling the gap between members
Joints in steel, aluminum or other non-porous (Figure 3).
surfaces should be primed in preparation for the
sealant installation.
CENTER PLATE

NOTE
If fire barrier is provided with the system, install
it at this time. Refer to the installation instruc-
tions for the fire barrier type provided.

NOTE
If water barrier is provided with the system,
install it at this time. Refer to the installation BASE MEMBERS
instructions for the water barrier type provided.
Figure 3—Base Members and Plate
Assembly
BASE MEMBER PREP
3. Using a wood block and mallet, lightly tap the face
1. Mark the locations for the anchor holes on all of seal tabs into the channels of the base members
the base members and drill the anchor holes. (Figure 4).
NOTE
Standard anchor spacing is 20” o.c. with an
anchor hole a maximum of 3” from each end of
the base member section.

2. If using wall base members, anchor holes need to


be countersunk.

SYSTEM INSTALLATION
SEAL AND BASE MEMBER
INSTALLATION
All elastomeric seals should be installed in as long lengths Figure 4—Seal Installation Method
as possible.
4 XXXX0000 Rev. 00/00/14
INSTALLATION INSTRUCTIONS FOR 7500
SERIES EXPANSION JOINT COVERS

NOTE 4. Place the wall base member into its installed po-
Lubricating the face seal’s arrows with soapy sition. Insure the anchor holes of the member and
water or liquid soap can make installation of the substrate align with each other.
face seal easier. 5. Attach the wall base member to the substrate with
the anchors supplied by the manufacturer.
WARNING 6. Repeat steps 1 through 5 until all wall base mem-
DO NOT USE OILS OR OIL BASED LUBRI- bers have been installed for the length of the joint.
CANTS ON THE FACE SEAL ARROWS. Ensure wall base members are butted up against
each other.
CAUTION 7. Using a wood block and mallet, lightly tap the face
Ensure the face seal tab is completely engaged seal tab into the channel along the installed wall base
into the channel. members the entire length of the joint (Figure 5).

4. Repeat steps 1 through 3 until all base members


have been assembled for the length of the joint. En-
sure base members are butted up against each other.
5. Place the joint seal assembly into its installed posi-
tion. Align the base members with the joint opening.
CAUTION
The base members should be completely on the
substrate surface and not overhanging the joint.

6. Using the seal assembly as a template, mark the


locations for the anchors on the substrate.
7. Remove the assembly and drill the anchor holes
1
/4” deeper than the length of the anchors.
8. Clean all dust and debris from the blockout.
9. Place the assembly into its installed position.
Figure 5—Face Seal Wall Member
10. Align the anchor holes of the members and sub-
Installation
strate with each other. Ensure the base members
are level with the finished floor. Shim as needed. CAUTION
11. Attach the base members to the substrate with the Ensure the face seal tab is completely engaged
anchors supplied by the manufacturer. into the channel.
75FVP and 75FVP-E Installation Only
8. Place the base member on the substrate opposite
1. Using the wall base member as a template, mark the wall base member aligned with the remaining
the locations for the anchors on the wall substrate. face seal tab.
Ensure the wall base member is straight, level,
properly aligned and at the correct elevation. CAUTION
2. Drill the anchor holes ¼” deeper than the length of Ensure the base member is plumb with the joint
the anchors. opening.
3. Clean all dust and debris from the blockout.
5 XXXX0000 Rev. 00/00/14
INSTALLATION INSTRUCTIONS FOR 7500
SERIES EXPANSION JOINT COVERS

9. The base member should be completely on the CAUTION


substrate surface and not overhanging the joint. Ensure the face seal tab is completely engaged
Ensure the base member is level with the finished into the channel.
floor (Figure 6).

FINISH WORK
1. Place masking tape over the top of the joint cover
system to protect it during grouting of the blockout.
2. Ensure the blockout is dammed well so that grout
will not leak out onto lower levels.
3. Prepare grout in accordance with the grout manu-
facturer’s instructions.
4. Install grout continuously between the base mem-
bers and blockout (Figure 7).

Figure 6—Seal Base Member Installed


Position

10. Shim as needed.


11. Using the base member as a template, drill the GROUT
anchor holes into the concrete.
12. Remove the base member and clean all dust and
debris from the blockout.
13. Place the base memebr back into the installed Figure 7—Grout Location
position.
14. Attach the base member to the substrate with the 5. Remove all excess grout from any exposed surfac-
anchors supplied by the manufacturer. es of the joint assembly before grout sets up.
15. Repeat steps 8 and 14 until all base members have 6. Install finish floor material in accordance with the
been installed for the length of the joint. Ensure manufacturer’s instructions.
base members are butted up against each other.
16. Using a wood block and mallet, lightly tap the face
seal tab into the channel along the base members
for the length of the joint (see Figure 6).

6 XXXX0000 Rev. 00/00/14


KANTAFLEX (INDIA) PVT LIMITED
113, PRAKASAM SALAM, BROADWAY, CHENNAI 600108
TELE FAX: +91 44 25361242 / 25361462

TEST CERTIFICATE FOR EXPANSION JOINT

TC No 1155 Model No : 75FP-1


Date May 27, 2019 Movement : +/- 25%

Issued to:
STANDARD INFRATECH INDIA (P) LTD Order No : SIIPL/MULUGU/110/2019-2020
Project: HORTICULTURE UNIT Date : 22.04.2019
MEDAK, TELANGANA. Quantity : 163.06 Meters

This is to certify that the expansion joint of Model No: 75FP-1 Floor to Floor is tested in accordance with ASTM
E 1399 – 97 (reapproved 2009) for cyclic movement and measuring the minimum and maximum joint widths
of architectural joint systems.

Product tested Floor to Floor Joint for 25MM gap


Model: 75FP-1
Movement: +/- 25%
Date of test May 25, 2019

VERIFICATION: REQUIREMENT: CYCLE TEST REMARKS:


Maximum joint width 31.25MM ASTM E1399-97 Found in order
Minimum joint width 18.75MM ASTM E1399-97 Found in order
Movement range 6.25MM to 31.25MM for 25MM gap ASTM E1399-97 Found in order
Cyclic test (500 cycles @ 1cpm) No fatigue failure ASTM E1399-97 No fatigue failure

PHYSICAL PROPERTIES OF COMPONENTS OF EXPANSION JOINTS:

1. Aluminum Frame (section No: 9060) - ASTM 6063 T6 - report attached

Note: This lot is cleared for dispatch.

Authorized signatory

FACTORY: B 52 (N) SIPCOT INDUSTRIAL COMPLEX, GUMMIDIPOONDI 601201


MAIL: kanta@kantaflex.in, WEB: www.kantaflex.in
KANTAFLEX (INDIA) PVT LIMITED
113, PRAKASAM SALAM, BROADWAY, CHENNAI 600108
TELE FAX: +91 44 25361242 / 25361462

DATE: 27.05.2019

TEST REPORT (EXTRACT) FOR ALUMINIUM NON HOLLOW PROFILE

S. No. SECTION NUMBER LENGTH ALLOY TEMPER DESCRIPTION


1. 9060 3000 MM 6063/T6 Al. NONHOLLOW

PHYSICAL TENSILE PROOF ELONGATION ELECTRICAL HARDNESS


TESTING
PROPERTIES STRENGTH STRESS IN MM G.L (%) CONDUCTIVITY (BHN)
STANDARD
(MPA)/(Kg/mm2) (MPA)/(Kg/mm2)
SECTION ASTM REQD RESULT REQD RESULT REQD RESULT --- ---
9060 6063 T6 215 225.97 170 186.52 8 9.84 --- ---

STANDARD AS PER EN : 573-3: 1994,755-2:1997


CHEMICAL COMPOSITION (IN %)
Heat No. Si Fe Mg Mn Cu Zn Ti Cr Al
Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max
REQD 0.20 0.60 --- 0.35 0.45 0.90 --- 0.10 --- 0.10 --- 0.10 --- 0.10 --- 0.10 Remaining
9060 0.450 0.150 0.520 0.0180 0.0010 0.0030 0.0060 0.0010 REM

Authorized signatory

FACTORY: B 52 (N) SIPCOT INDUSTRIAL COMPLEX, GUMMIDIPOONDI 601201


MAIL: kanta@kantaflex.in, WEB: www.kantaflex.in
KANTAFLEX (INDIA) PVT LIMITED
113, PRAKASAM SALAM, BROADWAY, CHENNAI 600108
TELE FAX: +91 44 25361242 / 25361462

Date:

S.No.

QUALITY CHECK REPORT

CLIENT NAME :

PROJECT :

NAME OF WORK :

LOCATION :

DATE OF START :

DATE OF COMPLETION :

QUANTITY :

Check List
Yes No
 Removal of existing treatment & cleaning of surface :

 Fixing of Waterproofing Membrane :

 Testing Of Leakage for 24 hrs :

 Making Of Bedding with Cement Mortar(1:3) :

QUALITY INCHARGE (KANTAFLEX) QUALITY INCHARGE

FACTORY: B 52 (N) SIPCOT INDUSTRIAL COMPLEX, GUMMIDIPOONDI 601201


MAIL: kanta@kantaflex.in, WEB: www.kantaflex.in
KANTFLEX (INDIA) PVT LTD
MEASUREMENT SHEET

PROJECT : RA BILL NO.


CLIENT NAME : DATE:
WORK ORDER NO :
LOCATION :

Gap in Order Billing


S.No Model Description
Mm Qty Qty

KANTAFLEX (INDA) PVT LTD CLIENT


&5('(17,$/6
*^ * SeffiWtlMerraRaitLimi*ed
sos*'Ilu ffis$tcH R.d;btir {D$R}* Scun*,in**fi.[..
Ts,
Mfs,,TSAH$f.St*st#il"$TRSy,**roUSf#
JVo
Fl'ef Osl$usl;
R*fsr*nesof CIsa
filsssFtbndat6ef lst|*Frfrorlsmfttffl PlsdFthst
At*s*sofi
Fisslpllri{Ss,Erdtfi
etor:
PraparedbyTeamLeadEr:

ffi
Bssufft#Htrsf$rofiss
FRSBS$C

SffinftlonofrW{$n$onr
A"Shlsutiun. Assfl*Selurs*ubmission
Inr*qulred
8. filoOfipu|ton
wilhsqrnmsrrtt.
$. Hutiessfl{oelFcfen

Co Ts; C$&il CMRL -


CI-IENNAI RAIIPROJECI
METRO
EMBYE Consoftium
r t ri t b v GeneralConsultant
for ChennaiMetro
_GENERATCONSUTIANT
- Phase1
-CZE-
Ref: GCC-282 1Il7 239 Date06,Sep20ll
Issued
By:DFU
LalS
To
TheContractor's
Representative,
M/s.Consolidated
Conshwtion
Consortium
Limited,
lnfracons
Division,
Khivraj
Complex#2,8uFloor,
480,AnnaSalai,
Nandanam,
- 600035,
Chennai

Attention
: Mr.M.F.Sait,
Proiect
Manager
Project: MetroRailproject- phase1
Chennal
Elevated
Stations- Koyambedu, CMBT,Arumbakkam, vadapalani(including
viaduct)
andAshokNagar/KK Nagar-EAS04
Sub : CompanyProfileof KantaFlexIndiaPvt.Ltd.,for thesupplyof Elastomeric
Bearing
RefNo.: CCCL-282-C2E-1101136 Dated:30August20t1
CCCI-282-C2E-1101007Dated:09August2011
OurReference:GCC-28i1-C2E-1115269 Dated:t2Auguet2011
DearSir,
Withreference
to theConkactor
letterno.CCCL-282-C2E-1101136
dated30August
2011regarding
theabove
subject.
Weacknowledge
receipt profile
ofcompany of M/s.Kanta
Flexlndiafot. Ltd,,forthesupply
of Elastomeric
Bearing
forEAS-04 package.
Contract
TheEmployer'sRepresentative
hereby accords
Notice
of NoObjection
to theuseof M/s.Kanta
FlexIndlaM. Ltd.,
forthesupply
of Elastomeric
Bearing package
forConhact EAS-04
of ChennaiMetroRailProject,
inaccordance
with
Volume 3,Section
D,Subsection
14,
Kindly
ensure pertaining
thatthenorots to thesampling
andtesting
isadhered
to at regular
Intervals.
Yours
faithfully,
ForEgisRailg\ Mauneell
AECOM,
YEC,EgisInd$ A\ARSYL(Consortium)
&=-M
r l r

{- pierrepreumofrt
Employe/sRepresentative
Encl.: Nil.
- CMRL
CcTo : GM(EC) - forInformation
please.

No.4ll54,ApexTower4u floor,2ndilalnRoad,R.A.Puram, - 600023.


Chennal Ph:044.43973973,
Fax:A44-43g73ggg

Email:embve.qc@.eq$ll.conl
(or)seneral.consulta$-t0embye.com
116J-r''0'i"4'-
|
t",f t$f lr rcu lvrttu u ncttr Lrr I urriu
4
DocuMENT (DSR) $ 'i'r'"r*
suumidslor.1'nrPoRT -
$TATU$$HEET
ORIGINATSR
ffi EtrrtgYE ffi cmnl
ORIGTNAT
N" of Conlract: UAA04 DSRCodeGCC-448-C2U-1 115667-A
Refurence0f LetterlTransmittal
MTC-220-C2U-1
100510 Civil- Undergrou*&
Discipline:
Receptiondateof LetterlTransmittal
2?-47-2411 Agsessor:VBS / DFU /f;st
Discipline
Cocrdinator:
RBB
Preparedby TeamLeader:ALM T+1

ProposalofPVCWaterStopper- Kantaflex
List of documentssubmitted
N" Document reference Notificatiqn
Revision Date
A B c
Vendor Frofileof Kantaflex(lndia)Pvt. Ltd - Doc No. MTC*
I
22A-C2U-1100510
22-07-2411 X

6
T

d
g
10
11
12
13
14
15
16

Ns*ifinp,$rqn DSCIUMEhiT
RHETruAL
fdHTns'l"tlN!,,l6LLt
t{S CHf Nl'lAl
Definition
of notification: SocNo:
. , D I
q{}r
-""-:p
is required
A completeresubmission
A. Objection.
fll / n
i ? At,$tr0il It
withcomm€nts.
B. No Objection A!- j
y[,.*.c* *p1g-llPr,t"** -*
QpjQ** * f !.tb** p4irr *_ |
C. Noticeof No Ob.iection {{e*unts.**- ijrr:r."
?r&e0fticn. I
ttvlE
,'
As notedin theCommentsheetattached.

RepeatedGomments New Comments

Noof Cornnrentsin PR Itloof Comments in NS

PR=PartialResubnlcsion: NS=Nert Submis$ion

. Thecommentsars givento ansurethesubn'rission confornsto theContractprovisions.


. The isst"re
of Noticeof trloObjectionshallnotin anywayrelievetheContractorof hisobligations
underlhe
Contract, nordoesit in anywayinrplyanychangeto the ContractPricear Timefor Completion.
LIST OF OUR INDIAN PROJECTS

S. No. PROJECT NAME SITE LOACTION


1. Green field cricket Stadium, IL&FS Trivandrum
2. IISER Phase-1 Trivandrum
3. IISER Phase-2 Trivandrum
4. KSRTC Bus station Trivandrum
5. HCL IT Park Trivandrum
6. Palakkad medical college Trivandrum
7. Info Park- MLCP Trivandrum
8. Cognizant technology solutions Cochin
9. DM Medcity Cochin
10. Infoaprk Phase –II Cochin
11. JNPT- Nava Siva Mumbai
12. Mumbai Mono Rail Mumbai
13. Sonam Builders Mumbai
14. Piramal Complex Mumbai
15. Kaledonia project Mumbai
16. Kohinoor City Mall Mumbai
17. Mahindra Eminent Mumbai
18. Rustomjee developers Mumbai
19. Balaji Symphony Mumbai
20. IITB hostel, Powai Mumbai
21. IKEA Mumbai
22. Apeejay Mumbai
23. Sea Queen developers Mumbai
24. Yavatmal hospital Yavatmal
25. 500 Bed Hospital Baramati
26. Infinity mall Mumbai
27. Metro Station buildings Nagpur
28. Cognizant IT Park, L&T Chennai
29. Chennai Metro Rail Limited Chennai
30. EIL Corporate building Chennai
31. VR Mall Chennai
32. Divya Sree IT park Chennai
33. ESIC Hospital, KK Nagar Chennai
34. ESIC Hopsital, Aynavarram Chennai
35. SP Infocity Chennai
36. CITADINE Hotel Chennai
37. Purwankara Windmere Chennai
38. Arihant Towers Chennai
39. Apollo Proton Cancer hospital Chennai
40. L&T-Tejomaya Chennai
41. Ocean LLP – Kone Elevators Chennai
42. North Town Estates Chennai
43. HLL Life care Madurai
44. JIPMER Hospital, Phase –II Pondicherry
45. BHAVINI Nuclear project Kalpakkam, Tamil Nadu
46. Kakrapar Nuclear power station, L&T Kakrapar, Gujarat
47. Reliance Industries Limited Silvassa, Gujarat
48. Reliance Industries Limited Jamnagar, Gujarat
49. Civil Hospital Ahmedabad
50. Kidney Hospital, Kathira Ahmedabad
51. Schott Kaisha Ahmedabad
52. Boys hostel Ahmedabad
53. Palladium Business hub Ahmedabad
54. Robotic park Ahmedabad
55. Puniska Ahmedabad
56. UN Mehta Hospital Ahmedabad
57. SAMRAS- Boys Hostel Baroda
58. SAMRAS College Baroda
59. Raghuvir developers Surat
60. Statue of Unity Gujarat
61. Ansal Highway Plaza Delhi
62. Ansal Shopping Complex Delhi
63. Delhi internation airport, NIB Delhi
64. Jet Airways Building Delhi
65. Pavanjali School Delhi
66. Mahindra World city Delhi
67. Delhi Flour mill Delhi
68. Covenant Engineering Delhi
69. Safdarjung Hospital Delhi
70. HCL IT Park Noida
71. Cognizant IT park Pune
72. WIPRO IT park Pune
73. Flagship Developers,Blue Ridge IT park Pune
74. Mahindra Life space Pune
75. Mahindra World city Jaipur
76. Bangalore International Airport Bangalore
77. Skylark Mansion Bangalore
78. OLETY Bangalore
79. Sobha Habitech Bangalore
80. BIOCON Bangalore
81. Mahnidra IT Park Bangalore
82. Bangalore metro Station Bangalore
83. Divya sree, ROW Project Bangalore
84. Divya Sree, Technopolis Bangalore
85. WIPRO Bangalore
86. Bagmane IT Park Bangalore
87. HPCL, Lanco Bangalore
88. Raheja Vivareia Bangalore
89. NITESH Hyde Park Bangalore
90. Triveni Turbines Bangalore
91. Global Mall Bangalore
92. KIMS Hospital Hyderabad
93. Sujana Mall Hyderabad
94. GAR IT Park Hyderabad
95. Phoenix IT Park Hyderabad
96. SATTVA IT Park Hyderabad
97. Shantha BIOTECH Hyderabad
98. TATA consultancy services Hyderabad
99. RK Interiors Hyderabad
100. Factset Hyderabad
101. Bapatla University Building Bapatla
102. Agartala Airport Agartala
PARTIAL LIST OF OUR INTERNATIONAL PROJECTS

S. No. PROJECT NAME SITE LOCATION

1 Palm Jumeriah UAE


2 Lima International Airport Peru
3 Doha Convention Center Qatar
4 Hong Kong Convention Center Hong Kong
5 Acapulco Government Bldg Mexico
6 Torre Medical Center Ecuador
7 Dubai Shopping Center UAE
8 King Saud University Saudi Arabia
9 Muscat International Airport Oman
10 Dubai Metro Rail UAE
11 Oasis Hotel UAE
12 Abu Dhabi Womens' College UAE
13 Sharjah Town Center UAE
14 Dubai Festival City UAE
15 Taj Mall Jordan
16 American University Jordan
17 Avenue Project Jordan
18 Marina Crescent Bldg Kuwait
19 Fahaheel Waterfront Development Kuwait
20 Ardiya Stadium Kuwait
21 Taif New Hospital Saudi Arabia
22 Redico-KSA Saudi Arabia
23 King Hussain Cancer Center Jordan
24 Old Town Hall Barbados
25 Warrens Tower Barbados
26 China State-British America Barbados
27 Sauter Asociado Costa Rica
28 Comelsa Yamuni Costa Rica
29 Alterra Costa Rica
30 Merck Sharp & Dohme Costa Rica
31 Hospital Nacional De Nino Costa Rica
32 Sabiva Power Plant Kuwait
33 Al Fanar Complex Kuwait
34 Al Seif Palace Kuwait
35 College of Technology Kuwait
36 Petrochemical Industries Kuwait
37 Public Institution for SS Kuwait
38 Marina Cresent Building Kuwait
39 Civil Service Headquarters
Kuwait Kuwait
40 Ardiya Stadium Kuwait
41 Al Sheikh Stadium Kuwait
42 Central Vegetable Market Kuwait
43 Al Andalus, Al Reggai Kuwait
44 Villa Nisf Kuwait
45 Kuwait Meterological Center Kuwait
46 Kuwait Business Town Kuwait
47 Apostolic Church Kuwait
48 Torre Medica I, II, & III Ecuador
49 Altos Del Parque Ecuador
50 Mall del Sol Ecuador
51 Sheraton Hotel Ecuador
52 Hospital Punta Pacifica Panama
53 Westland Mall Panama
54 Albrook Mall Panama
55 Aeropuerto Internacional Panama
56 Torre de las Americas Panama
57 Dorado Mall Panama
58 Hospital de Sona Panama
59 Royal Decameron Panama
60 Las Cumbres Mall Panama
61 Centro Comercial Brisas Panama
62 General Electric Motors Mexico
63 Trade Center Hipodrome Mexico
64 JC Penney Mexico
65 Bristol Mexico
66 Dine Terrum Peninsula Pro Mexico
67 St. Louis Cardinals Stadium St. Louis, MO - USA
68 Dallas / Ft. Worth Airport Dallas, TX - USA
69 McCarran Airport Las Vegas, NV - USA
70 Air & Space Museum Washington D.C. - USA
71 Microsoft Corporate Headquarters Hayward, CA - USA
72 Chicago Int'l Midway Airport Chicago, IL - USA
73 Exxon Mobil Al Wosail Tower Qatar
74 Multiplaza Mall Honduras
75 Hotel Camino Honduras
76 Hard Rock Hotel Orlando, FL - USA
77 Trpoicana North Casino Las Vegas, NV - USA
78 UCLA Intramural Field Los Angeles, CA - USA
79 Baptist University Hong Kong
80 Beijing Oriental Plaza Hong Kong
81 Disneyland Hong Kong
82 Excelsior Hotel Hong Kong
83 Hong Kong School of Creativity Hong Kong
84 Kowloon Station Hong Kong
85 Mandarain Oriental Hotel Hong Kong
86 Shanghai Finance & Trade Hong Kong
87 Skyplaza Hong Kong
88 Surabaya Airport Hong Kong
89 Tamg Shiu Kin Hospital Hong Kong
90 Museo de Arte San Juan, Puerto Rico
91 Hospital Menonita San Juan, Puerto Rico
92 Universidad Metropolitana San Juan, Puerto Rico
93 Escuela Superior Urbano San Juan, Puerto Rico
94 Plaza University Puerto Rico
95 Galeria Placia Puerto Rico
96 Hima Hospital Puerto Rico
97 Regent Centre New Zealand
98 Busch Memorial Hall St. Louis, MO - USA
99 NBA Memphis Arena Memphis, TN - USA
100 American Airlines Arena Miami, FL - USA
101 Kansas University Ellsworth Hall Topeka, KS - USA
102 St. Johns University Queens, NY - USA

Many 0RUH«

Вам также может понравиться