F3 G4 B5 ERECTION MATERIALS
2
BOP EL.112470 PT COMPONENT DESCRIPTION N.S. ITEM CODE QTY
NO (INS)
2692
8"NS
1
PIPE modified at 15:09 28 Jun 2019 , Drawing Created at 10:09:46 29 June 2019
CONT. ON
P-142204-12
E 910606
N 1066000
EL +109887
Hydro / 28.7
NDT(%) 10 1 As-Built 31Oct19 G.H.L K.H.K K.S.C DOC NO. 7T04-MP-14-IS-001
INSULATION
CODE - (
REF. P&ID
PWHT N 14-PI-022 0 Issued For Construction 30Jul14 JKK SJP MHP PROJ NO. 7T04 AREA 14 COMMODITY P
SIZE THICK QT'Y TRACING REF. G.A. DWG SHEET
(INCH) (mm) (M) SIZE X NO.
- X - 14-GA-150 REV DESCRIPTION DATE DRWN CHKD APPR L DWG NO. P-142203-01 1 OF 1
REV. 1
GDP-6PIPE-400 (SECTION 09) NOTE: THE ORIGINAL AND ALL COPIES OF THIS DRAWING TOGETHER WITH THE COPYRIGHT ARE THE SOLE PROPERTY OF GS E&C. SEOUL, KOREA AND SHALL NOT BE USED FOR ANY PURPOSE WITHOUT WRITTEN PERMISSION OF GS E&C. GLOBAL LEADER
DEPARTMENT: CODE: Procedure Code:
TECHNICAL SERVICE / ENGINEERING DIVISION
GENERAL COST ESTIMATE WORKSHEET Rev. No.: A1 No. of Page 1
Project Title Install Additional Isolation Valve for Coalescer Bypass Line # 8"-P-142203
Project No. MOC # 140006 GENERAL Take off Approved
1.1 SUPPLY OF 8" FLANGE A105 WN RF CL300 (ASME B16.5) SCH60 (LF00AF0708) 2 EA 205 410.00
SUPPLY OF 8" GASKET 316SS SPW TO ASME B 16.20 FOR RF 4.5T FLEXIBLE GRAPHITE
1.2 2 EA 25 50.00
W/IR-316SS OR-LOW C.S CL300 (ASME B16.5) (LG00ZF0008)
SUPPLY OF 7/8" x 150mm LENGTH STUD BOLT A193-B7 W/2 HEAVY HEX. NUTS(B18.2.2)
1.3 24 EA 7 168.00
A194-2H (LB00A011XD150)
SUPPLY OF 8" GATE VALVE A216-WCB FLGD-RF 13Cr W/STELLITE SEATS BB OS&Y
1.4 1 EA 1500 1,500.00
FLEXIBLE WEDGE ANSI CL300 API 600 (LVGAAF0008)
SUPPLY OF 3/4" GATE VALVE A105 SW x TE(NPT-F), REDUCING 13Cr W/STELLITE
1.5 1 EA 100 100.00
SEATS BB OS&Y PLAIN SOLID WEDGE API CL800 API 602 (LRVGAJ01)
SUPPLY OF 8"X 3/4" REINFORCED BRANCH OUTLET A105 SOCKET OUTLET FORGED
1.6 1 EA 20 20.00
SW CL6000 (LTSOAQ00)
1.7 SUPPLY OF 3/4" PIPE A106-B SMLS PE SCH160 (LP00AK00) 1 Meters 50 50.00
1.8 SUPPLY OF 3/4" PLUG A105 ROUND HEAD FORGED TE(NPT-M) (LPLGAW10) 1 EA 10 10.00
2 Construction 1,540.00
CUTTING (QTY: 2 8" PIPE CUTS) AND WELDING QTY (2) 8" FLANGES (CONSIDERING
2.1 THE LINES ARE PURGED) and welding (Qty: 2 - 3/4" Socket Welds) (ALL FIELD WELDS AT 20 Dia/inch 50 1000
SITE)
RT TESTING FOR THE TWO 8" JOINTS OF THE WELDED FLANGES AND PT TESTING FOR
2.2 7 Films 20 140
THE TWO SOCKET WELDS SIZE 3/4"
2.3 HYDROTESTING OF THE WELDED SPOOL AND TORQUE WRENCHING OF THE FLANGES 1 200 200
2.4 SAND BLASTING AND PAINTING FOR THE SUPPLIED MATERIAL INCLUDING TOUCH UPS 1 200 200