Mecorr Services Co.

Cathodic Protection Services

Cathodic Protection System


D E S I G N PA C K A G E
Design Package

Project Name Permanent Cathodic Protection System for Gas Pipeline Project

Owner Capital Gas Co.

Contractor Middle East Corrosion Control Co. (Mecorr)

CLIENT REFERENCE
NUMBER

MECORR REFERENCE REV. SUBMISSION DATE MECORR DOC. CONTROL #


P L C P - 0 7 0 5/10/2020

COMMENTS

PRELIMINARY VIEW REVISED AS NOTED FINAL SUBMISSION

DESIGN BY REVIEWED BY APPROVED BY

Ahmed Sayed
Doc No. : PLCP070-CG
Cathodic Protection System for El Hamed Gas Rev. No. :
Pipeline at Ras-Gharib Rev. Date : 5-Oct.-2020
Page :2

TABLE OF CONTENTS
1. INTRODUCTION.......................................................................................................................................................... 3

1.1. INTRODUCTION.............................................................................................................................................. 3

1.2. DESIGN SCOPE .............................................................................................................................................. 3

2. REFERENCES AND DOCUMENTS ............................................................................................................................ 3

2.1. APPLICABLE STANDARDS ............................................................................................................................ 3

2.2. PROJECT DRAWINGS .................................................................................................................................... 4

3. DESIGN APPROACH .................................................................................................................................................. 5

3.1. DESIGN BASIS: ............................................................................................................................................... 5

3.2. PROTECTIVE CRITERIA: ............................................................................................................................... 5

3.3. COATING & CURRENT DENSITY: .................................................................................................................. 5

3.4. DESIGN LIFE: .................................................................................................................................................. 6

3.5. CP SYSTEM DESCRIPTION: .......................................................................................................................... 6

4. MATERIAL SELECTION ............................................................................................................................................. 6

4.1. TRANSFORMER RECTIFIER ......................................................................................................................... 6

4.2. ANODES: ......................................................................................................................................................... 7

4.3. CABLES: .......................................................................................................................................................... 7

4.4. CARBONACEOUS BACKFILL: ........................................................................................................................ 7

4.5. TEST STATION: ............................................................................................................................................... 7

4.6. CONNECTION TO PIPELINE: ......................................................................................................................... 7

5. DESIGN CALCULATION OF CP SYSTEM ................................................................................................................. 8

5.1. VARIABLES & EQUATIONS: ........................................................................................................................... 8

5.2. SOIL RESISTIVITY MEASUREMENT: ............................................................................................................. 9

5.3. PIPELINE CURRENT CALCULATION: ............................................................................................................ 9

5.4. PIPELINE CURRENT CALCULATION: .......................................................................................................... 10

5.5. GROUNDBED RESISTANCE ........................................................................................................................ 10

5.6. CABLE RESISTENCE ................................................................................................................................... 11

5.7. PIPELINE RESISTANCE TO REMOTE EARTH ............................................................................................ 12

5.8. CIRCUT RESISTENCE CALCULATION ........................................................................................................ 12

5.9. PROPOSED TRANSFORMER RECTIFIER RATING: ................................................................................... 12

5.10. ATTENUATION CALCULATIONS: ................................................................................................................. 13

6. INSTALLATION GUIDELINES .................................................................................................................................. 13

6.1. GENERAL: ..................................................................................................................................................... 13

6.2. ANODES INSTALLATION: ............................................................................................................................. 13


6.3. CONNECTION TO PIPELINE CASING & COATING REPAIR: ...................................................................... 13

6.4. QUALITY CONTROL: .................................................................................................................................... 13

6.5. MATERIALS HANDLING: .............................................................................................................................. 13

7. BILL OF MATERIALS................................................................................................................................................ 14
Doc No. : PLCP070-CG
Cathodic Protection System for El Hamed Gas Rev. No. :
Pipeline at Ras-Gharib Rev. Date : 5-Oct.-2020
Page :3

1. INTRODUCTION

1.1. Introduction

Mecorr Petroleum Services Co. has been requested by Capital Gas Co. to provide
cathodic protection system for carbon steel gas pipeline from El Hamed station to
gas plant at Ras-Ghareb. The Cathodic Protection scope includes, Pre-Design
Survey, Design, Supply of Cathodic Protection Materials, installation and Testing &
Commissioning.

1.2. Design Scope

The Cathodic protection scope includes permanent CP system for Gas Pipeline.
This document details the design concept and theory of permanent CP system
(ICCP) for carbon steel gas pipeline from El Hamed field to gas Plant in Ras-Ghareb,
which are supported by full calculations, specifications, and bill of materials.

Table 1 – Structure Details

Pipeline Material Type Length (Meter) Size (inch) Coating Type


1 Carbon steel 14200 8 Epoxy coated with
polyurethane wrapping

2. REFERENCES AND DOCUMENTS

2.1. Applicable Standards

ISO -15589-1 Petroleum, petrochemical and natural gas industries - Cathodic protection of
pipeline systems
SP-0169: Control of external corrosion on underground or submerged metallic piping
system
SP-0502: Standard Practice Pipeline External Corrosion Direct Assessment
Methodology.
SP0286: Standard practice Electrical Isolation of Cathodically Protected Pipelines.
TM 0497: Measurement Technique Related to Criteria for Cathodic Protection on
Underground or Submerged Metallic Piping Systems

.
Doc No. : PLCP070-CG
Cathodic Protection System for El Hamed Gas Rev. No. :
Pipeline at Ras-Gharib Rev. Date : 5-Oct.-2020
Page :4

2.2. Project Drawings


PL21-DW-01 ICCP Schematic
PL21-DW-02 Anode junction box
PL21-DW-03 Big fink test station connection detail
PL21-DW-04 Thermite welding detail
PL21-DW-05 Ground bed installation detail
Doc No. : PLCP070-CG
Cathodic Protection System for El Hamed Gas Rev. No. :
Pipeline at Ras-Gharib Rev. Date : 5-Oct.-2020
Page :5

3. DESIGN APPROACH

3.1. Design Basis:

The proposed Gas transmission line is 0.219 m diameter and 14200 m long will be
permanently protected by ICCP system.

One new cathodic protection station will be proposed for the protection of gas
transmission line. The CP station will be installed at Gharib block station at the end
of the pipeline.

Proposed ICCP system summary is given in below table.


Table 2 – proposed CP system

Ground Bed Anode DC Rating Type of TR power


Sr. No Type Location
Type (Qty x Type) (V/A) supply

Gharib block Shallow 8 x MMO tubular


CP station 30V/25A TR (AC powered )
1 station horizontal anodes

1
3.2. Protective Criteria:

The National Association of Corrosion Engineer (NACE) SP0169 state that


adequate cathodic protection will be achieved if the following terms were fulfilled:
“ A negative polarized potential of at least 850 mV relative to a saturated

copper/copper sulfate reference electrode”


Or:
“A minimum of 100 mV of cathodic polarization between the structure surface and

a stable reference electrode contacting the electrolyte. The formation or decay of


Corrosion control can be achieved at various levels of cathodic polarization
depending on the environmental conditions.

3.3. Coating & Current Density:

Underground pipeline:
Coating: Epoxy coated with polyurethane wrapping
Current density: 0.8 mA/m2 ISO -15589-1
Safety factor: 25%
Final current density: 0.8 x1.25 = 1 mA/m2
Doc No. : PLCP070-CG
Cathodic Protection System for El Hamed Gas Rev. No. :
Pipeline at Ras-Gharib Rev. Date : 5-Oct.-2020
Page :6

3.4. Design life:

As per project specification, the design life time should be 25 years.

3.5. CP System Description:

The design calculations are based on using one dedicated Impressed Current
Cathodic Protection (ICCP) system for pipeline external surface. Cathodic protection
system is comprised of the following principle components:

The pipeline will be protected by an ICCP system using mixed metal oxide titanium
anodes (MMO), which will be installed in shallow horizontal groundbed 1.5 m depth,
50~70 m away from pipeline and the spacing between each anode shall be 1.5 m,
each anode will be surrounded by carbonaceous backfill.

All anode feeder cables (16 mm2 Cu/XLPE/PVC) shall be terminated in 10-Terminal
anode junction box, where they will be connected to a main positive cable (25 mm2
Cu/XLPE/PVC) coming from the positive pole of transformer rectifier.

Pipeline shall be connected to the negative cable (25 mm2 Cu/XLPE/PVC), which
will be welded to the pipeline surface through thermite welding from one end and
the other end will be connected to the negative terminal of the TRU.

Test station will be installed each 2 km along the pipeline route to monitor the
cathodic protection potential, it consists of measuring cable (4 mm2 Cu/XLPE/PVC)
tail terminated at test station & connected to pipeline surface by means of thermite
welding, which is used to measure the pipeline potential with help of portable
reference electrode.

4. MATERIAL SELECTION

4.1. Transformer rectifier

Transformer Rectifier (TR) will be conventional type, air cooled, rated for non-
hazardous area, with input single phase 220 V a frequency of 50 Hz, outdoor type
with DC output of 30V/25A for external ICCP system. Transformer rectifier will be
installed on a concrete pad suitably done on site.
Doc No. : PLCP070-CG
Cathodic Protection System for El Hamed Gas Rev. No. :
Pipeline at Ras-Gharib Rev. Date : 5-Oct.-2020
Page :7

4.2. Anodes:

ICCP system anodes will be of MMO anodes, complete with 16 mm2 Cu/XLPE/PVC
cable.

MMO anodes details:


Anode shape Tubular
Anode dimension 25 mm (Dia.) x 1000 mm (L)
Anode Current 8A
Anode Tail: 1x16 mm2 Cu/XLPE/PVC

4.3. Cables:

MMO anode cable: 16 mm2 Cu/XLPE/PVC insulation.


Pipeline connection: 25 mm2 Cu/XLPE/PVC insulation.
Mg anode cable: 6 mm2 Cu/XLPE/PVC insulation.
Measurement cable: 4 mm2 Cu/XLPE/PVC insulation.

4.4. Carbonaceous backfill:

Carbonaceous backfill will be used to lower the total resistance of the anode ground
bed, to improve current distribution and extend anode life.

4.5. Test station:

Test Stations shall be 2 terminals Big Fink type c/w, 3” PVC conduit.

4.6. Connection to pipeline:

All cable connections to pipeline will be performed by thermite welding.


Doc No. : PLCP070-CG
Cathodic Protection System for El Hamed Gas Rev. No. :
Pipeline at Ras-Gharib Rev. Date : 5-Oct.-2020
Page :8

5. DESIGN CALCULATION OF CP SYSTEM

5.1. Variables & Equations:

Table 3: Variables description

Variables Units Descriptions


A m2 Pipeline surface area
Da cm Single Anode diameter
La cm Single Anode length
L cm Anode Bed Active length
d cm Anode Bed Active Diameter
h cm Groundbed depth
Dp m Pipeline Diameter
Lp m Pipeline Length
Ir A Current required for the protection of the pipeline
i mA/M2 Current density
io A Anode current output
Na Each Number of anodes
Nc Each Number of Anodes by current calculation
Y Years Design lifetime
RT Ω Total Circuit resistance
Rg Ω Total Ground beds to earth resistance
RC Ω Total cables resistance
r’c Ω-m2 Average specific coating resistance
ρ Ω-cm Soil resistivity
r Ω/m Cable resistance per meter run
Rac Ω Anodes cable resistance
Rpc Ω Positive cable resistance
Rnc Ω Negative cable resistance
Rp,re Ω Pipeline resistance to remote earth
EMF V Back Electro-Motive force (2 Volts)
VT V Total Voltage Required
Doc No. : PLCP070-CG
Cathodic Protection System for El Hamed Gas Rev. No. :
Pipeline at Ras-Gharib Rev. Date : 5-Oct.-2020
Page :9

Table 4: Equations used in design calculations

Eqn. No. Description Equation

E01 Pipeline Surface Area A = π x Dp x Lp

E02 Current Required Ir = A x i

Number of Anodes as per Current


E03
calculation N = Ir /io

Dwight’s Modified Equation for a 𝜌 4𝐿 𝐿 2ℎ


E04 𝑅= ((ln⁡
( ) + ln⁡
( )−2+ )
horizontal electrode 2𝜋𝐿 𝑑 ℎ 𝐿

Equivalent Resistance for Parallel 1 1 1 1 1


E05     ....... 
Anode Cables RT R1 R2 R3 Rn

E06 Cable Resistance Per Meter Run Rcable = Lcable x rcable size

E07 Total Cable Resistance RC = Rac + Rpc + Rnc

E08 Total Circuit Resistance RT= RC + RG + Rp,re

E09 Voltage Required VT=(Ir x RT )+ 2V EMF

Pipeline Resistance to Remote


E10 Rp,re = r’c / A
Earth

5.2. Soil Resistivity Measurement:

Soil resistivity data was provided for the covered structure & data collected is based
on tests performed using Wenner Four-Electrode method in groundbed proposed
location.

Table 5 – Soil Resistivity Details

location Resistivity ρ (Ohm.cm)


Ras Gharib Gas Plant 1004.8

5.3. Pipeline current calculation:

The following table reflects the current density required for protection of buired
section of pipelines.
Doc No. : PLCP070-CG
Cathodic Protection System for El Hamed Gas Rev. No. :
Pipeline at Ras-Gharib Rev. Date : 5-Oct.-2020
Page : 10

Table 6: current requirement calculation

System Lp: Length Dp: Diameter A: Surface Area i: Current density Ir: Current
Pipeline Eq.
Type (m) (m) (m²) (mA/m²) Required (A)

Permanent CS pipeline 14200 0.219 9770 1 9.7 E01

Total Current Required 9.7

Gas pipeline needs a total current of 9.7 A which will be discharged by One CP
station installed at Gharib Gas Plant.

5.4. Pipeline current calculation:

The following table reflects the actual & proposed number anodes required for
protection of buired section of pipelines.

Table 7: No. of MMO anodes calculation

Anode Dimensions & Characteristics Value Unit

La Single Anode Length 100 CM

Da Single Anode Diameter 2.5 CM

io Anode Current Output 8 A

Number of Anodes Calculations Equation Value Unit

Ir Current required to discharge Refer sec.5.3 9.7 A

Nc Number of Anodes by Current Calculation E03 1.2 Anodes

Note: Number of anodes by weight calculation is not applicable for MMO anodes.

Although the Minimum resulted number of MMO anodes is 1.5, Eight (8) anodes
will be used to provide protection for more than 25 year life time, and to lower the
circuit resistance, ensure better current distribution and to make current capacity
equal to or more than TRU rating.

5.5. Groundbed resistance

MMO anode will be installed in shallow horizontal groundbed distance between


each anode will 1.5 m while the end distance will be 0.75 m and surrounded with
coke breeze with approx. diameter 25 cm.
Doc No. : PLCP070-CG
Cathodic Protection System for El Hamed Gas Rev. No. :
Pipeline at Ras-Gharib Rev. Date : 5-Oct.-2020
Page : 11

Table 8: Anode Bed Calculations

Var. Description Value Unit

L Single Anode Length 1 m

N Number of Anodes 8 Anodes

S Anode Separation 1.5 m

h Depth of anode bed 1.5 m

- Ending Space 0.75 m

La Total Anode Bed Active Length 20 m

Da Anode bed active Diameter 25 cm

ρ Soil Resistivity 1004.8 Ω-cm

Rg Anode Bed to Earth Resistance (E04) 0.51 Ω

5.6. Cable resistence

Each anode cable will be terminated at anode junction box, where main positive
cable coming from TRU will be connected to them.

Negative cable from TRU will be connected to the pipeline surface.

Table 9: Anode cable resistance

Anode Cables Resistance Calculations

Var. Description r (Ω/m) Length (m) Resistance (Ω) Equation

Rac1 Resistance of Anode 1 Cable-16 mm² 0.0016728 24 0.04015 E06

Rac2 Resistance of Anode 2 Cable-16 mm² 0.0016728 21.5 0.03597 E06

Rac3 Resistance of Anode 3 Cable-16 mm² 0.0016728 19 0.03178 E06

Rac4 Resistance of Anode 4 Cable-16 mm² 0.0016728 16.5 0.02760 E06

Rac5 Resistance of Anode 5 Cable-16 mm² 0.0016728 14 0.02342 E06

Rac6 Resistance of Anode 6 Cable-16 mm² 0.0016728 11.5 0.01924 E06

Rac7 Resistance of Anode 7 Cable-16 mm² 0.0016728 9 0.01506 E06

Rac8 Resistance of Anode 8 Cable-16 mm² 0.0016728 6.5 0.01087 E06

Rac Anode Cable Tails Total Resistance - - 0.00268 E05


Doc No. : PLCP070-CG
Cathodic Protection System for El Hamed Gas Rev. No. :
Pipeline at Ras-Gharib Rev. Date : 5-Oct.-2020
Page : 12

Table 10: Total cable resistance calculation

Total Cables Resistance Calculations

Var. Description r (Ω/m) Length (m) Resistance (Ω) Equation

Resistance of Main Positive Cable- 25 mm² (From TRU to anode


Rpc 0.0010529 100 0.10529 E06
junction box)

Resistance of Main Negative Cable- 25 mm² (From TRU to


Rnc 0.0010529 100 0.10529 E06
pipeline)

Anode Cable Tails Total Resistance (From anodes to anode


Rac - - 0.00268 E06
junction box)

Rc Total Cables Resistance(Rpc1+ Rmnc1+Rac+) - - 0.21326 E07

5.7. Pipeline resistance to remote earth

The typical specific coating resistence value (r’c) for new coating with a good quality
is 2 x103 Ω-M2 @ 1000 Ω-CM soil resestivity (reference NACE CP4 Manual)

Table 11: Pipeline to remote earth resistance calculation

Pipeline to Remote Earth Resistance Calculations

r’c (Ω-m2) @ r’c (Ω-m2) @ Pipe Surface Resistance


Var. Description Equation
1000 Ω.cm 440 Ω.cm Area (A) (Ω)

Rp,re Resistance of pipeline to remote earth 2x103 2018 9770 0.2 E10

5.8. Circut resistence calculation

Table 12: Total CP circuit resistance calculation

Circuit Resistance Calculations


Var. Description Value Unit Equation
RT Total Circuit Resistance 0.91 Ω E08
Ir Current Required 9.7 A Refer sec.5.3

VT Voltage Required (Including back EMF of 2V) 10.8 V E09

5.9. Proposed transformer rectifier rating:

Table 13: TRU rating

Transformer Rectifier Rating Output


Var. Description Value Unit
ITR Rated Current Output 30 A
VTR Rated Voltage Output 25 V
Doc No. : PLCP070-CG
Cathodic Protection System for El Hamed Gas Rev. No. :
Pipeline at Ras-Gharib Rev. Date : 5-Oct.-2020
Page : 13

The required transformer rectifier capacity with spare capacity as per above table is
30V – 25A.

5.10. Attenuation calculations:

See appendix -1 for attenuation.


As per attenuation, one CP system for 8 inch pipeline can protect 19 km on both
sides of drain point.

6. INSTALLATION GUIDELINES
6.1. General:

The Cathodic protection systems will be carried out according to client standard and
specifications, and the Project drawings and specifications.
Before commencing installation, these guidelines in conjunction with all relevant
project drawings and documentation should be reviewed and understood.

The pipeline shall be electrically isolated from any other metallic structure at both
ends

The proposed anode bed locations at Ras-Gharib gas plant, where electric power
source will be available for the transformer rectifier have to be approved by client.

6.2. Anodes Installation:

Horizontal anode bed installation shall be performed as per the attached design
drawings. Anode shall be handled with a great care.

6.3. Connection to Pipeline Casing & Coating Repair:

All cable connections to pipeline casing shall be provided by thermite welding, and
coating shall be repaired using the Epoxy.

6.4. Quality control:

The installation works shall always be carried out within an appropriate quality
control system.

6.5. Materials Handling:

All materials associated with the installation works will be considered as fragile and
will be treated accordingly.
All cables will be handled and stored to avoid damage to the installation.
Doc No. : PLCP070-CG
Cathodic Protection System for El Hamed Gas Rev. No. :
Pipeline at Ras-Gharib Rev. Date : 5-Oct.-2020
Page : 14

7. BILL OF MATERIALS
Table 14: Preliminary Bill of permanent CP System

ITEM DESCRIPTION UNIT QTY


Transformer rectifier unit, input: single phase 220V- 50Hz and output:
1. Each 1
30V/25A
MMO tubular anodes 25mm x 1000 mm c/w 16 mm2 Cu/XLPE/PVC
2. Each 8
cables with suitable length.
3. Anode Junction box 10 terminals. Each 1
4. Big fink test station with 1.5 m PVC support pipe. Each 8
5. Cu/XLPE/PVC cable 1x25 mm2 Negative and positive header. Meter 200
6. Cu/XLPE/PVC cable 1x4 mm2 test cable. Meter 40
7. Coke breeze. Ton 1
8. Handy cap. Each 9
9. Thermite welding powder cartridge. Lot 9
Doc No. : PLCP070-CG
Cathodic Protection System for El Hamed Gas Rev. No. :
Pipeline at Ras-Gharib Rev. Date : 5-Oct.-2020
Page : 15

Appendix -1

Symbol Quantity Value Unit Value in SI Units


ɸ Pipe Diameter 8 Inch 0.20320 m
t Pipe Wall Thickness 0.32 Inch 0.00813 m
L TOT Total Pipe Length- (One Way) 14.2 Km 14,200.0 m
LX Max. Pipe Protection L from DP to "X" 14.2 Km 14,200.0 m
cd Current Density (Overall) 1 mA/m² 0.00100 A/m²
ρ Steel Resistivity (Typically 18 μ Ω cm 18 μΩ.cm 1.80E-07 Ω.m
PotNAT Native Potential (Assumed) 500 -mV (CSE) 0.500 V
PotPOL Polarised Potential (Assumed) (ON) 1200 -mV (CSE) 1.200 V
PotDP Max. Drain Point Potential (ON) 2000 -mV (CSE) 2.000 V
PotMIN Min. Pipe Potential (Off) 850 -mV (CSE) 0.850 V
- Coating Type Liqued Epoxy N/A
g Coating Conductivity (Reciprocal of Rl) 500 μ-Siemens/m² 0.00050 Siemens/m²

Calculations:

Symbol Description Equation Value


AX X-Sectional Area of Pipe Steel = π [ɸ² - (ɸ - 2t)²] / 4 0.0050 m²
A1 Unit Surface Area of Pipe =πɸ 0.6384 m²/m
ATOT Total Pipe Surface Area (From DP to X) = π ɸ L TOT = A1 L TOT 9,064.9 m²
I REQ Current Required (One Way from DP to X) = ATOT cd 9.0649 A
RS Unit Pipe Linear Resistance = ρ / AX 3.61E-05 Ω/m
Rl Coating Leakage Resistance N/A N/A
RL Coating Leakage Resistivity = 1 / (g x Al) 3,133.0 Ω.m
α Attenuation Constant per (m) = √ (RS / RL) 1.07E-04 Per m
δEO Change in Potential at Drain Point = PotDP - PotNAT 1.500 V
δEXREQ Change in Potential (Required) at Point "X" = PotPOL - PotMIN 0.350 V
δEXCALC Change in Potential (Calculated) at Point "X" = δEO / Cosh(α x LX) 0.623 V
RO Characteristic Resistance = K1 / (t x √ɸ) 1.441 Ω
IO Current at Drain Point = k2 x ATOT 0.033 A

Graph Data
Potential Vs Distance Dist. (Km) Potential (V)
0.0 2.000
2.500
2.0 1.966
-Ve On Pipe/Soil

2.000 4.0 1.871


Potential (CSE)

6.0 1.735
1.500
8.0 1.577
1.000 10.0 1.418
12.0 1.268
0.500
14.0 1.136
0.000 16.0 1.021
0.0 2.0 4.0 6.0 8.0 10.0 12.0 14.0 16.0 18.0 19.0 18.0 0.925
Km Away from Drain Point 19.0 0.883
Drawings
AJB

General Petroleum Co.

Capital Gas Co.

MECORR

Impressed Current Cathodic Protection


System for Gas Pipeline

Cathodic Protection Schematic


ANODES Junction Box

1 5

16 MM2-CU/XLPE/PVC TO ANODES
2 6

3 7

4 8
Owner

General Petroleum Co.

Contractor
Capital Gas Co.

Sub Contractor

MECORR

TO MAIN +VE TERMINAL AT T/R


25 MM2-Cu/XLPE/PVC

Impressed Current Cathodic Protection


System for Gas Pipeline

Anode Junction Box


TEST STATION

DETAIL -01

4" PVC support pipe

TEST WIRE TERMINAL

1*4MM2 CU/XLPE/PVC
FOR TEST

Owner

General Petroleum Co.

Capital Gas Co.

Sub Contractor

MECORR

DETAIL -01
Impressed Current Cathodic Protection
System for Gas Pipeline

Test Station
STEP 1 STEEL STEP 2
STRANDED COPPER WIRE

ADAPTOR SLEEVES
CLEAN SURFACE TO BRIGHT METAL APPEARANCE AT WELD STRIP INSULATION FROM CABLE AND INSTALL ADAPTOR SLEEVES
LOCATION BY MECHANICAL GRINDER
HANDEL
GRAPHITE MOULD STARTING POWDER
STEP 3 GRAPHITE COVER
METAL POWDER
GRAPHITE MOULD
WIRE

OPENING STEEL

HOLD GRAPHITE MOULD FIRMLY OVER ADAPTOR SLEEVES WITH OPENING AWAY FROM OPERATOR -IGNITE STARTING POWDER

STEP 4 STEP 5

Owner

PRIME AND COAT THERMITE WELD General Petroleum Co.

ALL EXPOSED METAL


AT WELD AREA Capital Gas Co.

Sub Contractor
WIRE MECORR

REMOVE SLAG FROM CONNECTION AND THOROUGHLY CLEAN WELD AREA


STEEL

Impressed Current Cathodic Protection


System for Gas Pipeline

Thermite welding
ANODES Junction Box

3" PIPE

1*25MM2 CU/XLPE/PVC
TO MAIN +VE TERMINAL AT T/R

SOIL

200 CM
1*16MM2 CU/XLPE/PVC
FOR EACH ANODE

General Petroleum Co.

Capital Gas Co.

MECORR

1150 CM 100 CM 150 CM 100 CM 150 CM 100 CM 150 CM 100 CM 150 CM 100 CM 75 CM

COKE BREEZE 8 MMO ANODES


100CM *2.5 CM dia Impressed Current Cathodic Protection
System for Gas Pipeline

Ground Bed Installation Detail