Вы находитесь на странице: 1из 17

RAD WorkPack Summery of Vessel

WorkPack No: WPK004-R-2019-RT


Descrptions: Radiogrphy Inspection of Corrosion Circuit WND-PJ-CS-24
Sites: Giza Fayoum
Date: 20-Jan-20 WOs: 2019-011731
Inspection Interval: Baseline Inspection
Due Date: 30-Dec-19
Purpose / Philosophy

Inspection / Testing activities are performed to assess the current physical condition of the equipment
to assist in determining the capability of the equipment to safely continue service under the current
design & operational conditions.

General rules

General Technical Comments:

Technical documentation:

Technician shall ensure that they have access and understand all procedures and technique sheets
referenced within this work pack and all relevant OIS and BP requirements/procedures/instruction, if
you do not have access or are unfamiliar with the specified procedure/technique sheet this should be
immediately reported to the responsible IE/IA (Copies of relevant procedures are available via the
responsible IE).

Technician shall ensure that the activity undertaken is within the technician range of certification and
that that certification is valid at the time of testing (Notify the supervising IE/IA in the event any of these
conditions are not met)

Site Anomaly Criteria:

Refer to IIM-OPR-063 and IIM-OPR-064 for relevant guidance of site anomaly criteria and required
response measures.

In general deterioration more than 33% of the corrosion allowance (i.e. Nominal Thickness - (Corrosion
Allowance x 0.33)) may require additional investigation and enhanced site data collection (i.e. anomaly
sketching) and should be considered a site anomaly.

All site anomalies shall be discussed with the responsible IE/IA prior to the end of each shift or closing
out the site permit. Anomalies may require additional testing to assess the full scope and / or provide
input in to future FFS evaluations.

Where anomalies are identified, in general, a sketch showing the defective cross-sectional area shall be
included with the NDE report. All dimensions must also be must be accurately measured and recorded,
i.e. circ., length, axial length, material loss/through-thickness depth, minimum remaining wall/weld
thickness, location/position of anomaly in relation to a fixed point etc. Refer to IIM-
OPR-063 and IIM-OPR-064 for additional guidance.

Inspection Reporting

Oceaneering reporting procedure IIM-OPR-021 and approved OIS report formats will be used. Where a
standard report format is not provided within the OIS BMS then the OIS general inspection report
format may be used (Variation from the standard reports should be discussed and agreed with the
applicable IE/IA).

Final report shall be a submitted in pdf file format, digitally signed by the applicable technician and
supervising IE/IA

All electronic Inspection Reports (MS Format: Word or Excel) shall be submitted to the applicable TA for
electronic Filing.

Where possible direct reporting in ACET will be utilized using the inspector's password protected login.

Daily progress reports shall be issued by the technician to the supervising IE/IA. Standard OIS DPR
format shall be used and shall contain all relevant information related to progress, delays, anomalies
etc. noted for that day.

On completion of work, all outstanding items shall be punch listed within the WPK and the signed
workpack (Including signed inspection / testing reports/punch list etc.) returned to the responsible IE/IA

Safety

General Safety comment:

Adherence to OIS & BP site safety rules is compulsory.

Ensure work is fully described in the permit to work and that all condition of the permit has been met
prior to commencement of work activities.

All work should be performed in accordance with the relevant method statement; the site personnel are
responsible to ensure that the method statement is suitable for the site conditions.

On completion of work or at the end of each shift feedback on the status of work activities must be
provided to the BP Site representative.

All permits must be suspended at the end of each shift or closed out on completion of work activities.

All safety incidents must be reported to the responsible IE/IA ASAP but no later than the end of the
same shift.
Scope

RT Examination RT Carbon Steel Equipment.

Perform RT Examination on Equipment identified in this work pack in accordance the approved ITP,
examination shall be performed with due consideration given to the requirements contained with the
following OIS and BP documents: Related Inspection Routine; NDT-OPR-016. Reference to BP GN 32-031
(Development of Upstream Risk Based Inspection Schemes)

The responsible NDT technician is required to familiarize themselves with the requirements of this
workpack and the specific damage mechanisms specified in this workpack. Consult with the IE/IA during
job briefing and with the responsible IE on site to ensure sufficient coverage is performed and
limitations is discussed, and scope increased if required.

The responsible IE/NDT Technician supervising the RT examinations shall familiarise themselves with the
latest revision of the RBA output and the following damage mechanisms shall be inspected for and will
be located on the internal surfaces of the piping loop and vessel’s nozzles

RAD inspection based on RBA output

Carry out radiographic inspections for small bore pipes in the mentioned corrosion circuit in accordance
with attached sheet, marked up drawings and photos
Responsibilities

Site Inspection Personnel:

All personnel performing work on site shall ensure that they have a valid site induction and are aware of
OIS & BP site safety rules and permit scope, requirements and conditions. Where this cannot be ensured
no work may be performed until the situation is corrected. (Refer to General Rules, General safety
comments).

Provide daily feedback to the responsible IE on the status of completion (including delays), Safety
concerns or violations, equipment anomalies, inspection / testing restrictions or limitations or deviations
from the requirements of this work pack.

Contacts

Abdallah Abd Eldayem

aeldayem@oceaneering.com

Abdallah.abdeldayem@bp.com

+201026925899

Mohammed Fawzy

Mohamed.Elkhamissi@rashpetco.com

+201222689262
Checklist for R & M Support for Inspection Activities (Rev 2)

Inspection GMS WON 2019-011731 Target Completion Date 30-12-19


Radiogrphy Inspection of Corrosion Circuit WND-PJ-CS-
Work Order Description Inspection Workpack Number WPK004-R-2019-RT
24
R & M Function WON Date Raised
Support Required Yes No Comments
1. Isolation No
2. Insulation Removal No
3. Electrical Isolation of Heat Tracing No
4. Lifting No
5. CSE No
6. Ventilation No
7. Lighting No
8. Cleaning No
9. Scaffold No
10. Joints to opened for inspection. No
11. Fresh Water Supply. No
12. Electrical Power Supply (110V). No
13. Coating Removal and Reinstatement. No
14. Electrical PAT Test. No
Comments
No supports Required
RADIOGRPHY INSPECTION OF CORROSION CIRCUIT (WND-PJ-CS-24)
Nominal Minimum
Test Diameter Maximum
Item ID Feature ID Feature Type Thickness Thickness Location Comments
Point (mm) Thickness (mm)
(mm) (mm)
2in-P-27-133-DD3-NI Sockolet 1 Pipe 3/4'' 7.82 RAD AT HV 1319 (PSV 134)
2in-P-27-133-DD3-NI TREDL 2L Reducer 2'' 8.74
2in-P-27-133-DD3-NI TREDS 2S Reducer 1'' 9.09
2in-R-PJ-20-058-B01T-NI Elbow 1 Elblow 2'' 11.07 Upstream of valve HV 2605
2in-R-PJ-20-058-B01T-NI STLH 2 Pipe 2'' 11.07
2in-R-PJ-20-057-B01T-NI Elbow 1 Elblow 2'' 11.07 Upstream of valve HV-0737
2in-R-PJ-20-057-B01T-NI STLH 2 Pipe 2'' 11.07
2in-DO-56-200-DD3-NI Elbow 1 Elblow 2'' 8.74 Drain Line Valve HV1575
2in-DO-56-200-DD3-NI STLH 2 Pipe 2'' 8.74
2in-DO-56-200-DD3-NI Elbow 1 Elblow 2'' 8.74
20in-P-27-104-D3-NI STLV Pipe 1'' 6.35 Drain Valve HV 1224

Note Pipe Material Class (PMC ): DD3, CA: 6 mm


Pipe Material Class (PMC ): D3, CA: 3 mm
Line No: 2in-DO-56-200-DD3-NI
001

002

003

Radiography Inspection Scope


The Inspection to be conducted from ground level
24in-P-27-109-DD3-NI

2in-DO-56-200-DD3
Line No: 2in-P-27-133-DD3-NI

PSV 134

002L
002S

HV-1319

001

Radiography Inspection Scope

Note: Inspection to be conducted from access P/F


Location: 2in-P-27-133-DD3-NI
Location: 2in-R-PJ-20-057-B01T-NI
C.O.
N SHOP
R-PAGR-A-R-PJ-20-057-002
E 4467750
N 3162790
EL +112300
Radiography Inspection Scope PT
NO DESCRIPTION
NPD
(in) STOCK CODE QTY
__ ___________ _______ __________ ___
STEM UP
ORIENT HANDLE SOUTH 1 Pipe, A333-6, Smls, XXS, B36.10M, BBE, 2 PPPCH909SS00 2107 MM
R-20-HV-0734 DRL, SOUR
2 Tee, A420-WPL6, Smls, XXS, B16.9, BW, 2X2 PFCTHE09XS04 1

C.O.
The Inspection to be conducted from access P/F 3
SOUR
El-90, LR, A420-WPL6, Smls, XXS, B16.9, 2 PFQNHE09SS04 4
BW, SOUR
R-PAGR-A-R-FL-44-019-002 29
1 0 4 FlgWn, A350-LF2-1, CL150, XXS, RF, 2 PFFW8F19AS05 2
E 4467450 F4 3 B16.5, SOUR
N 3163260
EL +111860
002 JF-R-PJ-20-057-1013 2"N
PD EL +112300

FIELD

F4 G5 B6 PT NPD
JF-R-PJ-20-057-1009 NO DESCRIPTION (in) STOCK CODE QTY
__ ___________ _______ __________ ___

7 5 Gasket, SpWnd, 316L-FG, 3mm SSSS, 2 PGGC2W10AS04 3


G5 B6
STEM UP B16.20, CL150, RF, B16.5
G5 B6

440
ORIENT HANDLE EAST 6 Stud Bolt&Nuts A320-L7/ A194-4L, 2 heavy 5/8 FBBV6X00GR0C 12
R-20-HV-0736 hex nuts, ASME B1.1, Galv. - 85 mm
Length

1
1 S9 7 Ball RB Float A350-LF2-1 Tr.SS316 RPTFE 2 BA01B1NLN102 1
178 FS-F4-1-1102 API 608 CL150 RF Lvr SOUR 6mm See d/s
2"N
PD FS-F4A-2 2 8 Globe-T PlgDsc A350-LF2-1 Tr.SS316 HF 2 GL01B1SHNB02 1
2X2"NPD API 602 CL150 B16.5 RF HW SOUR 6mm
CLASS: EL +111860 d/s

B01PF 203
PIPE SUPPORTS
CLASS:
8 9 Pipe Support 2 FS-F4A-2 1
B01T
STEM UP
R-20-HV-0737 PIECE MARKS
0
37 30
JF-R-PJ-20-057-1007 0 R-PAGR-A-R-PJ-20-057-001-1 R-PAGR-A-R-PJ-20-057-001-2
19 1
JF-R-PJ-20-057-1008 9

1
3

PLTF PENETRATION
TOG EL 111530

784
001

454 C.O.
R-PAGR-A-R-PJ-20-058-004
E 4468224
N 3162200
EL +111000
R-PAGR-A-R-PJ-20-057-001-2
3X2"NPD

3"NPD
R-PAGR-A-R-PJ-20-057-001-FW-1001
FW
76
R-PAGR-A-R-PJ-20-057-001-FW-1002
4 FW
3 47

1
1
R-PAGR-A-R-PJ-20-057-001-1
30
0

PIPE NPD (in) 2

P&I D NO.: EG001-PE-PID-11R-20-0010-001 SPEC.: B01T


NOTES:
1. ALL DIMENSIONS, CO-ORDINATES AND ELEVATIONS ARE IN mm UNLESS NOTED OTHERWISE.
FLUID CODE: PJ,PROCESS HYDROCARBON GAS MATERIAL: LTCS
2. FOR ISOMETRIC GENERAL NOTES, SEE DRAWING EG001-PI-STD-11-0045-001.
3. FOR PIPE SUPPORT DETAILS REFER TO DRAWING NUMBER EG001-PI-PSD-11-0001-001.
DESIGN OPERATION RATING: ASME CL150
4. FOR PAINTING AND COLOUR BANDING OF PIPING REFER TO DOCUMENT NUMBERS EG001-MT-SPE-11-0001
AND EG001-MT-SPE-11-0004. MAX TEMP.: 80.00 C 27.00 C CORROSION ALLOWANCE: 6. mm
5. FOR INSULATION DETAILS REFER TO INSULATION SPECIFICATION EG001-MT-SPE-11-0013.
WND PROJECT INTERNAL (BECHTEL CONFIDENTIAL)
MAX PRESS.: 10.000 barg 5.800 barg DENSITY: SEE LDT
6. FOR PIPING STANDARD DETAILS REFER TO DRAWING NUMBER EG001-PI-STD-11-0044-001.
7. WHERE LINE PARAMETERS ARE SHOWN THEY ARE FOR REFERENCE ONLY. REFER ALSO TO RELEVANT
BP WEST NILE DELTA GAS DEVELOPMENT PROJECT
AREA LINE LIST. INSULATION TYPE(S): N HEAT TREATMENT: PER FORM 167 ISO. NAME

INSULATION THK(S): NON DEST. EXAM.: PER FORM 167 R-PAGR-A-R-PJ-20-057-001


S3D HEAT TRACE: Not Heat Traced PAINT SPEC(S): B3-1
DWG. NO. SHEET: REV.

EG001-PI-ISO-11R-PAGR-A-R-PJ-20-057-001 1 OF 1 C01
TEST TYPE: H CRITICALITY RATING: 3 PAINT COLOUR: 7035/3001/1003 C0 1 24-May-2017 APPROVED FOR CONSTRUCTION NM KAH NMC RS WV
REV
TEST PRESSURE: 15.000 barg CLEANLINESS CLASS: C CODE REV DATE REASON FOR ISSUE BY CHK STRESS MATL SUPV AGREEMENT No. GPO-WND-EPCC-16-017
25937_WISS_Border 25/05/2017 15:14:38 LONDON LINE ID. R-PAGR-A-R-PJ-20-057-001 EXTRACTION DATE 24 MAY 2017 15:36
26-APR-2017 (R9) PIPELINE R-PJ-20-057 ROSETTA
25/05/2017 15:14:42 c:\temp\rad64D2C\radC6050\R-PAGR-A-R-PJ-20-057-001.sha 00L_PIPING
Location: Line No: 2in-R-PJ-20-058-B01T-NI
C.O.
N R-PAGR-A-R-PJ-20-058-006
HV-2605 SHOP
E 4468600
N 3164412
EL +111860
G4 B5
JF-R-PJ-20-058-1009
002 Radiography Inspection Scope PT
NO DESCRIPTION
__ ___________
NPD
(in)
_______
STOCK CODE
__________
QTY
___
203 178
1 Pipe, A333-6, Smls, XXS, B36.10M, BBE, 2 PPPCH909SS00 2213 MM
7 DRL, SOUR
STEM UP 2 El-90, LR, A420-WPL6, Smls, XXS, B16.9, 2 PFQNHE09SS04 3
F3 G4 B5
R-20-HV-0744 BW, SOUR
JF-R-PJ-20-058-1016 3 FlgWn, A350-LF2-1, CL150, XXS, RF, 2 PFFW8F19AS05 1
JF-R-PJ-20-058-1017
G4 B5 B16.5, SOUR
6 1
The Inspection to be conducted from access P/F
STEM UP FIELD
ORIENT HANDLE EAST 2"N
PD 34
R-20-HV-2605 0 PT NPD
S8
NO DESCRIPTION (in) STOCK CODE QTY
FS-F4-1-1101 __ ___________ _______ __________ ___
FS-F4A-2 17
5 4 Gasket, SpWnd, 316L-FG, 3mm SSSS, 2 PGGC2W10AS04 3
B16.20, CL150, RF, B16.5
5 Stud Bolt&Nuts A320-L7/ A194-4L, 2 heavy 5/8 FBBV6X00GR0C 12
hex nuts, ASME B1.1, Galv. - 85 mm
Length
R-PAGR-A-R-PJ-20-058-007-1
6 Ball RB Float A350-LF2-1 Tr.SS316 RPTFE 2 BA01B1NLN102 1
2
API 608 CL150 RF Lvr SOUR 6mm See d/s
EL +111860 7 Globe-T PlgDsc A350-LF2-1 Tr.SS316 HF 2 GL01B1SHNB02 1
API 602 CL150 B16.5 RF HW SOUR 6mm
d/s

PIPE SUPPORTS
8 Pipe Support 2 FS-F4A-2 2

1
001 PIECE MARKS

613
R-PAGR-A-R-PJ-20-058-007-1 R-PAGR-A-R-PJ-20-058-007-2

PLTF PENETRATION
TOG EL 111530

282
R-PAGR-A-R-PJ-20-058-007-FW-1001
FW
76

S8
FS-F4-1-1601
FS-F4A-2

14
82
R-PAGR-A-R-PJ-20-058-007-2

69
9
2

C.O.
R-PAGR-A-R-PJ-20-058-004
E 4468376 1
N 3162200 4
EL +111171 22

3X2"NPD R-PAGR-A-R-PJ-20-058-007-FW-1002
3"NPD FW

PIPE NPD (in) 2

P&I D NO.: EG001-PE-PID-11R-20-0010-001 SPEC.: B01T


NOTES:
1. ALL DIMENSIONS, CO-ORDINATES AND ELEVATIONS ARE IN mm UNLESS NOTED OTHERWISE.
FLUID CODE: PJ,PROCESS HYDROCARBON GAS MATERIAL: LTCS
2. FOR ISOMETRIC GENERAL NOTES, SEE DRAWING EG001-PI-STD-11-0045-001.
3. FOR PIPE SUPPORT DETAILS REFER TO DRAWING NUMBER EG001-PI-PSD-11-0001-001.
DESIGN OPERATION RATING: ASME CL150
4. FOR PAINTING AND COLOUR BANDING OF PIPING REFER TO DOCUMENT NUMBERS EG001-MT-SPE-11-0001
AND EG001-MT-SPE-11-0004. MAX TEMP.: 80.00 C 27.00 C CORROSION ALLOWANCE: 6. mm
5. FOR INSULATION DETAILS REFER TO INSULATION SPECIFICATION EG001-MT-SPE-11-0013.
WND PROJECT INTERNAL (BECHTEL CONFIDENTIAL)
MAX PRESS.: 10.000 barg 5.800 barg DENSITY: SEE LDT
6. FOR PIPING STANDARD DETAILS REFER TO DRAWING NUMBER EG001-PI-STD-11-0044-001.
7. WHERE LINE PARAMETERS ARE SHOWN THEY ARE FOR REFERENCE ONLY. REFER ALSO TO RELEVANT
BP WEST NILE DELTA GAS DEVELOPMENT PROJECT
AREA LINE LIST. INSULATION TYPE(S): N HEAT TREATMENT: PER FORM 167 ISO. NAME

INSULATION THK(S): NON DEST. EXAM.: PER FORM 167 R-PAGR-A-R-PJ-20-058-007


S3D HEAT TRACE: Not Heat Traced PAINT SPEC(S): B3-1
DWG. NO. SHEET: REV.

EG001-PI-ISO-11R-PAGR-A-R-PJ-20-058-007 1 OF 1 C01
TEST TYPE: H CRITICALITY RATING: 3 PAINT COLOUR: 7035/3001/1003 C0 1 24-May-2017 APPROVED FOR CONSTRUCTION NM KAH NMC RS WV
REV
TEST PRESSURE: 15.000 barg CLEANLINESS CLASS: C CODE REV DATE REASON FOR ISSUE BY CHK STRESS MATL SUPV AGREEMENT No. GPO-WND-EPCC-16-017
25937_WISS_Border 25/05/2017 15:28:46 LONDON LINE ID. R-PAGR-A-R-PJ-20-058-007 EXTRACTION DATE 24 MAY 2017 15:38
26-APR-2017 (R9) PIPELINE R-PJ-20-058 ROSETTA
25/05/2017 15:28:50 c:\temp\rad64D2C\rad01B0E\R-PAGR-A-R-PJ-20-058-007.sha 00L_PIPING
Line No: 20in-P-27-104-D3-NI

001
Line No: 20in-P-27-104-D3-NI

Radiography Inspection Scope

001

The Inspection to be conducted from ground level


E-2721A/B V-2731 TO HP FLARE HEADER GENERAL NOTES
3in- FW-41-101-AH3-NI
SUCTION/DISCHARGE INTERCHANGER COMP. DISCHARGE KO DRUM 10623 11R-42-0002-001 1. FOR GENERAL NOTES AND SYMBOLS REFER TO P&ID LEGEND SHEETS
NO POCKETS
DUTY.:4788.00 kW SIZE (DIAMETER TO LENGTH).:2400 mm/4700 mm 4106-491-KKD-20 EG001-PE-PID-11R-00-0001-001 TO EG001-PE-PID-11R-00-0007-001.
SHELL SIDE DESIGN PRESS.:-1.0 barg/98.0 barg DESIGN PRESS.:-1.0 barg/98.0 barg SET @ 98.0 barg SET @ 98.0 barg

3in x 2in
2. ALL TAGGED PIPING ITEMS ARE SHOWN WITH AN ABBREVIATED FORMAT TAG NUMBER.
SHELL SIDE DESIGN TEMP.:0.00 C/60.00 C DESIGN TEMP.:0.00 C/60.00 C 1D2 1D2 SRD FULL TAG NUMBER CAN BE GENERATED BY INSERTING THE FACILITY IDENTIFIER AND
SET @ 98.0 barg
EG001-PE-PID-11R-27-9018-001

TUBE SIDE DESIGN PRESS.:-1.0 barg/98.0 barg MOC.:CS + 3.2mm SRD EXTERNAL FIRE EXTERNAL FIRE SYSTEM NUMBER BEFORE THE PIPING ITEM PREFIX IN THE ABBREVIATED TAG
TUBE SIDE DESIGN TEMP.:0.00 C/100.00 C 1E2 SRD
TRIM.: VT-27-005-DD3-NI EXTERNAL FIRE (E.G. HV-0001 BECOMES R-SS-HV-0001 WHERE R- IS THE FACILITY CODE AND SS IS THE

41 3

AH 1
MOC SHELL.:316L SS

AH
INSULATION.:NI SYSTEM NUMBER OF THE LINE OR EQUIPMENT OF ORIGIN).

3
4
MOC TUBE.: 316L SS

B0 4 1
3
TRIM.: VT-27-017-DD3-NI (CN1A/B) NOTES

DD
41

1P
TRIM SHELL SIDE.: VT-27-004-EW3-NI

D
TRIM.: VT-27-018-DD3-NI (CN2A/B) AH3

3
27

F 27
FROM ANTI SURGE

27
TRIM TUBE SIDE.: VT-27-020-EW3-NI 1 mm 1. NEW SCOPE DETAILS ARE PROVIDED FOR REFERENCE ONLY.

B0
CONTROL TRAIN A TRIM.: VT-27-019-DD3-NI (CN3A/B) 3in x 2in 3in x 2in DD3
INSULATION.:NI LO LO TIP 2in-R-PJ-27-075-B06T-NI 200 mm 2in-R-FW-41-002-B01PF-NI 2. DELETED.

6T
27
1189211R-27-0011-001 FB
24
FB
24
SRD 3. FOR INSTRUMENT AND ELECTRICAL CABLES DEMOLITION SCOPE AND SKID CONCRETE
2750-200-KKD-36A 1/2 2in x 1in 2in x 1in REMOVAL SCOPE REFER TO DOC. EG001-EM-LST-11R-0003.
TO TURBINE SPEED SRD 4. FOR CONTINUATION OF LINES THAT ARE PART OF DECOMMISSION/DEMOLITION SCOPE
3/4in 3/4in HOLD 2 1in-R-PJ-27-043-B06T-NI REFER TO P&IDS WITH A SEQUENCE NUMBER PREFIXED BY 9.
CONTROL TRAIN A TIP HOLD 3 TO HP FLARE HEADER
SET @ 98.0 barg LO 3in- FW-41-102-AH3-NI
11R-27-0011-001 11893 10624 11R-42-0002-001

LC
1E2 FB
24
LC NO POCKETS
2750-200-KKD-36A 1/2 EXTERNAL FIRE FB
24 TIP 41 4106-491-KKD-20
1in 1in AH3
TO TURBINE SPEED SRD LO LC
8in-R-PJ-27-073-K06KC-NI
FB FB SET @ 98.0 barg DD3 SRD

41 1PF
CONTROL TRAIN B
24
24
LC 27
1D2 SRD

B0
11R-27-0013-001 11894 LOAD SHARING
1 mm EXTERNAL FIRE
2750-200-KKD-36B SH01

6T
200 mm 2in-R-FW-41-001-B01PF-NI

2in x 1in
27
27 41 1 mm

B0

2in-R-PJ-27-074-B06T-NI
FROM ANTI SURGE I/A K06KC K01KF
CONTROL TRAIN B
B01PF B01PF
200 mm
8in-R-FW-41-093-K01KF-NI
TO HP FLARE HEADER HOLDS
1189111R-27-0013-001 HOLD 2 LC 17378 11R-42-0002-001 1. DELETED.

AH 1
SET @ 98.0 barg

AH
AH3 AH3

8in x 3in
3
2750-200-KKD-36B SH01 2. NEW PSV TO BE FITTED WITHIN EXISTING CONNECTIONS TO BE CONFIRMED PENDING

41

4
1D2 4106-491-KKD-20

1in
D3
LO
(Incl. Sheet No.)

D 7
FROM DISCHARGE EXTERNAL FIRE VENDOR INFORMATION.

D
D
LO LO

3
2
27
COOLER (A-2721A) FB FB DD3 AH3 3. DEMOLITION OF LINE AND REQUIREMENT FOR NEW RO TO BE CONFIRMED PENDING
16in- P-27-106-E3-NI 24 24
DRG No.

11863 11R-27-0012-001 TIP 3in x 2in 3in x 2in TIP 1in 4in x 3in 4in x 3in 6in- FW-41-103-AH3-NI
TO HP FLARE HEADER FINALISED MDMT CALCULATION AND AIV ANALYSIS.
2750-200-KKD-36A 2/2 10625 11R-42-0002-001
H FO FC 6in x 4in

4in- P-27-132-DD3-NI
2in x 1in 2in x 1in K06KC LO 4106-491-KKD-20
FROM DISCHARGE SRD
COOLER (V-2721B) 3/4in
16in- P-27-108-E3-NI 3/4in DD3
2in x 1in
11848 11R-27-0014-001 1in-R-PJ-27-044-B06T-NI TIP
2750-200-KKD-36B SH02 TIP B06T TIP SRD
B06T
DD3
16in- P-27-107-E3-NI LO DD3
1in FB
24 LC PROJECT NEW SCOPE
FB

3/4in
24

2in- P-27-133-DD3-NI LO
FB 3in x 2in LC
20in x 16in NO POCKETS
24
FB
24

FUTURE
20in- P-27-105-E3-NI 2in

NO POCKETS
2in DEMOLITION SCOPE
3/4in

3/4in
I/A
14in- P-27-250-E3-NI

3in- P-27-134-DD3-NI
LCP 24in- P-27-117-DD3-NI
2750-200-KKD-37

NO POCKETS
3/4in

TO FEED GAS FILTER


24in x 20in COALESCER FL-2521
18in- P-27-255-D3-NI
10626 11R-27-0001-001
FC 2617-220-KKD-16A

3/4in

3/4in

3/4in
20in- P-27-131-DD3-NI
2in

2in

S2 V1 V2

T1 T2
E-2721A
D1 D2 S1
DRAWING No.
RASHPETCO

2in
2in

2in

N2
18in- P-27-254-DD3-NI N3
UNTREATED GAS
TO/FROM R27FV137
NNF 12in-R-PJ-27-054-B09T-NI
10614 11R-27-0020-001 3in
- N6

B09T 2in
CN4
20in- P-27-130-DD3-NI B06T
20in
V-2731

3/4in
N1
14in- P-27-252-E3-NI 27
56
TIP

3/4in
3/4in

TIP
18in- P-27-257-D3-NI
20in-R-PJ-27-085-B06T-NI 2in 2in x 3/4in
2in- P-27-135-DD3-NI

CN1A
2in

2in

H CN2A 1in
HH DISP
M1
S2 V1 V2
24in
T1 T2 1in TIP
E-2721B CN2B

D1 D2 S1 2in
H PROCESS CONTROL PROCESS PLANT MET MECH AEM
2in HHLL=900 mm ON-OFF SYSTEMS SAFETY LAYOUT
2in

2in

CONTROL & PIPING


18in- P-27-256-DD3-NI CN3A L
DISP GWR
HLL=700 mm
TO SUCTION K.O. KH CW IB WV EF HA KE
DRUM (V-2721A) LL 1in
20in- P-27-102-D3-NI H 2in LLL=300 mm
11R-27-0011-001 10330 CN3B 2in

3/4in
2750-200-KKD-36A 1/2 LLLL=200 mm 2in
LC

TO SUCTION K.O. N4
DRUM (V-2721B) UC
20in- P-27-103-D3-NI 3/4in 1in
11R-27-0013-001 11860 N5 CN1B
2in
2750-200-KKD-36B SH01 C02 27-Jan-2017 RE-APPROVED FOR CONSTRUCTION JB MDP TDB MP
20in- P-27-104-D3-NI 2in x 3/4in
LC

2in
C01 17-Jun-2016 APPROVED FOR CONSTRUCTION JB MDP TDB MP

3/4in
24in x 20in
3/4in
FUTURE B01 19-Feb-2016 APPROVED FOR DESIGN LT MDP TDB MP
24in- P-27-101-D3-NI H

3/4in
2in- DO-56-202-EW3-CC

SP
3/4in

LEAD
SRD REV DATE REASON FOR ISSUE BY CKD
ENG
PEM
56
27

2in-R-PJ-27-079-B06T-NI 4109 TIP


2in- DO-56-201-DD3-NI

2in DRAWN: CM CHECKED: LOND


2in- P-27-140-EW3-CC
NNF

SCH
B06T
R-27-SCH-001
SP SP I/A
001 TIP AGREEMENT No. GPO-WND-EPCC-15-012
DD3 NC THIRD ANGLE PROJECTION

1033 1032 I/A UNLESS OTHERWISE NOTED

V-2023 FROM INLET


LL LCP
SEPARATOR
11226 11R-20-0008-001
CC

SRD
B06T DD3 24in- P-27-109-DD3-NI 27
4106-491-KKD-03 DD3 TIP 2in- DC-57-101-A3-NI
3/4in

24in- P-27-100-DD3-NI K09K B06T 56 27 57


2in

LC LC LC
NI
2in-R-PJ-27-090-B06T-NI

B06T TIP EW3 A3 "WND PROJECT INTERNAL - (BECHTEL CONFIDENTIAL)"


2in-R-PJ-27-091-B06T-NI

TIP
EG001-PE-PID-11R-27-0018-001\pbuwanab\27/01/2017 07:39:43

TIP 1in TO CLOSED DRAIN © 2014/15/16/17 BP EXPLORATION (DELTA) LTD ("BP"). THIS DOCUMENT, PREPARED UNDER CONTRACT GPO-WND-EPCC-15-012 (THE
LC LC 2in x 1in 2in x 1in HEADER "CONTRACT") BETWEEN BECHTEL INTERNATIONAL INC. ("BECHTEL") AND BP, CONTAINS INFORMATION CONFIDENTIAL AND/OR
2in- P-27-501-DD3-NI 2in- DO-56-200-DD3-NI PROPRIETARY TO BP THAT IS NOT TO BE USED, DISCLOSED, OR REPRODUCED IN ANY FORM BY ANY PERSON OR ENTITY OTHER THAN
3/4in 3/4in 3/4in 10648 11R-57-0001-002 BP WITHOUT BP'S PRIOR WRITTEN PERMISSION. ALL RIGHTS RESERVED. NOTICE: THESE MATERIALS ARE THE WORK PRODUCT OF
SRD NNF
NNF

BECHTEL. BECHTEL ACCEPTS NO LIABILITY FOR ANY RELIANCE BY ANY PERSON OTHER THAN ITS CLIENT, BP, ON THE CONTENT OF
LC LC 3in x 2in 3in x 2in FC FC 4106-491-KKD-30 THIS WORK PRODUCT. BP HAS EXPRESSLY AUTHORIZED BECHTEL TO ISSUE THIS DISCLAIMER.

3/4in

3/4in
2in-R-ML-27-002-K09K-NI AG UG
2in

TIP TIP
1in

1in

CC NI PROJECT TITLE
2in 3in-R-PK-27-034-K09K-CC
BP WEST NILE DELTA GAS DEVELOPMENT PROJECT
MIN.

TIP
LC DRAWING TITLE
PIPING & INSTRUMENT DIAGRAM
1in

10094 11865 12152 TIP


LP METHANOL 47 27
3/4in

3/4in

INJECTION FROM K09K B06T OWD OWD OWD


2in- P-27-140-EW3-NI
RAVEN LC 11R-57-0001-001 11R-57-0001-001 11R-57-0001-001
24in- P-27-500-DD3-NI 4106-491-KKD-30 4106-491-KKD-30 4106-491-KKD-30
11141 11R-47-0001-001 RASHPETCO SCALE DRG SIZE
DRAWING No. 2750-200-KKD-37 A1
3/4in

DRAWING No. No. of Sheets REV.


2in-R-ME-47-004-K09K-NI (Incl. Sheet No.) EG001-PE-PID-11R-27-9018-001 001 C02
R-V-2030 SET @ 9.7 barg 1 mm HP FLARE GENERAL NOTES
SRD 6Q8 14in-R-FW-41-051-B01PV-NI 200 mm
CONDENSATE SEPARATOR CONTROL MALFUNCTION
SET @ 9.7 barg 2 PHASE
14446 11R-42-0002-002 1. FOR GENERAL NOTES AND SYMBOLS REFER TO P&ID LEGEND SHEETS
EG001-PE-PID-11R-00-0001-001 TO EG001-PE-PID-11R-00-0007-001.

41 PV
SIZE (DIAMETER TO LENGTH).:2600 mm/6500 mm SLUG FLOW
SRD 6Q8 2. ALL TAGGED PIPING ITEMS ARE SHOWN WITH AN ABBREVIATED FORMAT TAG NUMBER.

1
DESIGN PRESS.:-1.0 barg/10.0 barg CONTROL MALFUNCTION

B0

1in
FULL TAG NUMBER CAN BE GENERATED BY INSERTING THE FACILITY IDENTIFIER AND
EG001-PE-PID-11R-20-0010-001

DESIGN TEMP.:-45.60 C/80.00 C SYSTEM NUMBER BEFORE THE PIPING ITEM PREFIX IN THE ABBREVIATED TAG

20 T
14in x 8in

41 PV
1
MOC.:LINED CS + 3mm CA

B0

1
(E.G. HV-0001 BECOMES R-SS-HV-0001 WHERE R- IS THE FACILITY CODE AND SS IS THE

B0

1in
TRIM.:R-VT-20-062-B01T-HC 1 mm SYSTEM NUMBER OF THE LINE OR EQUIPMENT OF ORIGIN).
ILO HP FLARE

20 T
INSULATION.:HC 14in x 8in

1
14in-R-FW-41-052-B01PV-NI
FB 200 mm NOTES

B0
TRIM.:R-VT-20-012-B01T-HC (K1A/B) 8in x 6in 17 24
14445 11R-42-0002-002
TRIM.:R-VT-20-014-B01TS-HC(K2A/B/C) 14in x 8in SRD ILO 2 PHASE
1. DELETED.
TRIM.:R-VT-20-011-B01T-HC (K3A/B) FB
24 SLUG FLOW
SP 2. BLOWDOWN VALVE ASSOCIATED COMPONENTS ARE SHOWN IN THE TABLE BELOW.
TRIM.:R-VT-20-013-B01T-HC (K4A/B) 1in 8in x 6in
1in SRD
TRIM.:R-VT-20-224-B01TS-HC(K6A/B/C) 3104 14in x 8in 1 mm IA IA IA
BLOWDOWN

ILO
FB
TRIM.:R-VT-20-015-B01TS-HC(K7A/B/C) PT PI PSV

24
SRD 200 mm VALVE GATE CHECK VOLUME
TRIM.:R-VT-20-252-B01T-HC (K11A/B) VALVE VALVE TANK
3in-R-FL-44-003-B01PF-NI
TRIM.:R-VT-20-253-B01T-HC (K12A/B) R-20- SPVT-0 03

R20BDZV904

ILC
FB
B01T B01PF

24
SRD
20 44 3. SIS SIGNAL GIVES PERMISSIVE TO OPEN BLOWDOWN VALVE. BLOWDOWN VALVE
14in-R-PJ-20-147-B01T-NI
1000 MIN OPENING IS BY MANUAL INITIATION ONLY.
3in x 2in LP FLARE , ,
PRESSURISATION 3in-R-PJ-20-060-B01T-NI 4. CONDENSATE LIQUID LEVELS: HHLL=1600 mm HLL=1400 mm
14443 11R-42-0002-001 NLL=1150 mm , LLL=900 mm , LLLL=700 mm
FROM HP FUEL GAS FO 3in x 2in LO HOLD 23
2in-R-GF-46-012-B03P-NI 4106-491-KKD-20
2 3 FB FB 5. MEG/CONDENSATE INTERFACE LIQUID LEVELS: IHHLL=1300 mm , IHLL=1200 mm

1in
13509 11R-45-0005-002 24

INLL=1100 mm,ILLL=950 mm , ILLLL=850 mm ,


H
SPLIT RANGE 6. SPLIT RANGE CONTROLLER.
6 50-100%
1in L HOLD 22
OPEN
B01T B01PF 4in-R-FL-44-019-B01PF-NI

0-50%
(Incl. Sheet No.)

20 44

7A

7B
1in 1 mm
23 LP FLARE

83
FROM SLUG CATCHER

83
2in-R-PJ-20-247-B01T-NI
DRG No.

2in-R-PJ-20-057-B01T-NI 200 mm 9773 11R-42-0002-001

V
BOTTOMS HEATER SRD

0P

0P
4in-R-PK-20-050-B06TS-HC FC

R2

R2
11964 11R-20-0012-001 4106-491-KKD-20
TSO

1in

1in
FC 2 PHASE

46
SP

FC
- 1_1/2in
FROM CONDENSATE FB CLOSED
1in

14in-R-PJ-20-059-B01T-NI
HEADER 4106 2in 0% 50% 100%

20
4in-R-PK-20-109-B01T-NI

2in-R-GF-20-100-B03P-NI
OUTPUT ON

3in-R-PJ-20-058-B01T-NI
10180 11R-20-0009-001
SLUG FLOW 2 PHASE HOLD 22 11 12

2 PHASE
4106-491-KKD-04 HH INCREASING PROCESS VARIABLE
HH
SCH
R-20-SCH-001

11 7. - 10. DELETED.
3in-R-GF-45-039-B01TM-NI
TO SLUGCATCHER WATER/CONDENSATE PROFILER 001
11. LOCAL INDICATOR R20UI837 TO BE VISIBLE FROM GLOBE VALVE R-20-HV-0737.
LEVEL CONTROL INTERFACE
HOLD 25 TSO LP FUEL GAS HEADER 12. MANUAL DEPRESSURISATION VALVE.
11R-20-0005-001 10598 13. VESSEL LEVEL IS CONTROLLED BY CASCADE FLOW CONTROL AND RATIO CONTROL TO
11 11222 11R-45-0002-001 FLOW A PROPORTION OF STREAM TO RAVEN FACILITIES. RATIO CONTROL SET POINTS
4106-491-KKD-02 NO POCKETS
FLDO FC 2617-220-KKD-26 SHOULD NORMALLY BE SET AT 100% R20FC725 AND 0% R20FC738; ANY ADJUSTMENTS

2in

1in

1in

1in
LL HH 1_1/2in 20 45 SHOULD BE MADE MANUALLY.
H 2oo3
50%-100% B01T B01TM 14. RAVEN VALVES LOCATED WITHIN GF SITE.

1in
2in

14in x 12in
LL CONDENSATE 15. L/R ELBOW AND IMPINGEMENT PLATE ON HEAD.

6in x 4in

6in x 4in
L 23 TO R20HS002
GWR 16. VANE TYPE INLET DEVICE.
RS

RS

RS

RS

RS
2in

2in

2in
25 13 24 1362211R-20-0005-001 17. 'SRD' DEPICTION COVERS PSV INLET AND OUTLET MANUAL VALVES AND INTERLOCK
MIN. 2in
1in

3in GWR 6in 4106-491-KKD-02 MECHANISM.


GWR
N2 18. SAMPLE CONNECTION DETAILS SHOWN ON EG001-PE-PID-11R-00-0009-001 AND
N12 N3 N13 K5 K10 K9 N9 3in EG001-PE-PID-11R-00-0011-001.
N1 16 2in
1in 15 3in 19. MEG/WATER OUTLET NOZZLE TO BE LOCATED 375mm ABOVE BOTTOM OF THE VESSEL
K2A SRD SRD SRD TO PREVENT SAND CARRYOVER. CONDENSATE OUTLET NOZZLE ELEVATION 200mm.
0%-50%

K3A K1A 3in 1in 20. DELETED.


3in 21. TOP ENTRY.
K7A 3in 3in GWR 3in GWR 3in GWR 22. DELETED.
K11A K4A K12A H
K6A 23. RI20014 IS A PAS FUNCTION WHICH WILL BE PASSED DOWN FROM THE SIS. THIS
2in FUNCTIONALITY IS NOT A SIF.
1in
3in L
1in 1in 1in 24. LOW SELECTOR TO LIMIT FLOW SENT TO RAVEN TO THE MAXIMUM PROCESSABLE

50-100%
K6C CONDENSATE LO 3in LO 3in LO 3in
-

13 FLOWRATE AGREED WITH RAVEN.


M1 R-V-2030 M2

0-50%
4 25. HANDSWITCH TO BE MOVED TO ON POSITION FOLLOWING CONFIRMATION FROM RAVEN
24in 3in 24in PLANT TO BE ABLE TO HANDLE MEG AND OR CONDENSATE FROM GF.
K6B MAG
MAG 2in K7C LO 3in LO 3in LO 3in
DRAWING No.

26. LOW SELECTOR TO LIMIT DOWNSTREAM MEG FLOW TO 41m3/h AND CONDENSATE FLOW
RASHPETCO

MEG/WATER TO 24.4 m3/H TO AVOID OVER FILLING DOWN STREAM SYSTEMS.


K2C 3in
5 27. HIGH SELECTOR TO ALLOW SIMULTANEOUS PROCESSING OF MEG AND/OR
K11B K4B K12B
3in H CONDENSATE SEPARATED IN RV-2030 IN BOTH GF AND RAVEN.
K3B K1B 28. SAND SAMPLE CONNECTION TO BE LOCATED AT 6 O'CLOCK POSITION (UNDERSIDE OF
2in

K7B K8 25
2in L 2in PIPE ON PROCESS LINE).

1600

LC

LC

LC
2in

2in

2in
B01T 29. FUNNEL SHALL BE LOCATED AT MINIMUM 1M FROM THE LAST ISOLATION VALVE.
K2B 2in 3in 3in
3in 19 MIN. 19 30. STRAIGHT LENGTH REQUIREMENT IS 10D UPSTREAM & 5D DOWNSTREAM OF THE FLOW
2in-R-DC-20-143-B01TS-HC MIN. B01TS
N10 ELEMENT.
N7 N8A N11A N5 N8B N11B N4 N6

2in-R-DC-20-142-B01TS-HC
2in

2in

2in
6in x 4in
2in

2in

4in-R-PK-20-052-B01T-NI
RS

RS
2in-R-DC-20-140-B01TS-HC 27 PROJECT NEW SCOPE
2in

2in

2in

2in

2in-R-DC-20-141-B01TS-HC
MIN.

HOLDS
4in-R-MH-20-239-B01TS-NI

1in
1- 19. DELETED.
29 24 20. SAND SAMPLE DETAILS.
2in SRD 1in 21. PSV INLET/OUTLET LINE SIZE AND PSV SIZE.
MIN.

1in
22. CONTROL VALVE SIZE TO BE CONFIRMED BY VENDOR.
9769 23. BLOWDOWN VALVE TAIL PIPE SIZE.
FC

HC
OWD 20 24. DELETED.
FB
24
B01TS
11R-57-0001-001 25. SAMPLE PROBE TAP OFF DETAILS AND CONNECTING LINE SIZE.
4106-491-KKD-30 B01P
57 CLOSED DRAINS
3in-R-DC-20-139-B01T-NI NI
1in 9774 11R-57-0001-002
FB 3in-R-DC-57-016-B01P-NI
24
4106-491-KKD-30 PROCESS CONTROL PROCESS PLANT MET MECH AEM

1in

1in
29 1 mm SYSTEMS SAFETY LAYOUT
20 57
2in B01T B01P 100 mm & PIPING
FB
9772 FC
KH CW IB WV EF HA KE
OWD
11R-57-0001-001 RATIO C01 13-Jan-2017 ISSUED FOR CONSTRUCTION 1 LT AW TDB MP
4106-491-KKD-30
B07 29-Jul-2016 RE-APPROVED FOR DESIGN 2 KMR MDP TDB MP
13 B06 15-Jul-2016 RE-APPROVED FOR DESIGN 2 KMR MDP TDB MP
4in-R-PK-20-053-B01T-NI

RATIO B05 31-Mar-2016 APPROVED FOR DESIGN 2 MJL MDP TDP MP


2in-R-MH-20-225-B01TS-NI

14
HOLD 20
SP 13 HOLD 25 26 TO RAVEN RERUN B04 26-Nov-2015 APPROVED FOR DESIGN 1 MJL JB TDB MP
4in x 3in 4in x 3in 21 DRUM E-V-2101
4066 SCF 6in-R-PK-20-095-B01T-NI 6in-R-PK-20-096-B01T-NI
26 R-20-SCF-001
10893 11-00-0502-001 B03 16-Jul-2015 RE-ISSUED FOR HAZOP AL TDB RVV MP
001 SLUG FLOW 2 PHASE
18 28 2in FC LEAD
SLUG FLOW

1in
REV DATE REASON FOR ISSUE BY CKD PEM
1in

1in

1in
SCS 18 FC FROM RICH MEG ENG
R-20-SCS-003 SP 30 HOLD 22
003 PUMP R-P-2801
2in-R-PK-28-017-B01T-NI DRAWN: CM CHECKED: LS
RICH MEG FLASH 4063 11R-28-0004-001 14556
FB
24
FB
24
DRUM R-V-2801
2 PHASE SP -
11R-28-0001-001 6500 4067 AGREEMENT No. GPO-WND-EPCC-15-012 THIRD ANGLE PROJECTION
FC 4064 18 28 HOLD 20 UNLESS OTHERWISE NOTED
- FC HOLD 20
4in-R-MH-20-007-B01TS-NI

2in 2in-R-MH-20-126-B01TS-NI 30 SP
1in
1in

1in

1in

FB
SCJ SRD SCS
HOLD 22 R-20-SCJ-002 R-20-SCS-002

002 2in-R-PK-20-238-B01T-NI 2in-R-PK-20-226-B01T-NI 002


1in

1in
TO CONDENSATE
4in-R-MH-20-001-B01TS-NI 18
4in x 3in HEAT EXCHANGER
4in-R-PK-20-060-B01T-NI
12201 11R-20-0016-001
2 PHASE "WND PROJECT INTERNAL - (BECHTEL CONFIDENTIAL)"
4in x 3in 2in FC
SLUG FLOW
EG001-PE-PID-11R-20-0010-001\cmancini\13/01/2017 16:03:41

1in

1in
© 2014/15/16/17 BP EXPLORATION (DELTA) LTD ("BP"). THIS DOCUMENT, PREPARED UNDER CONTRACT GPO-WND-EPCC-15-012 (THE
1in

FC "CONTRACT") BETWEEN BECHTEL INTERNATIONAL INC. ("BECHTEL") AND BP, CONTAINS INFORMATION CONFIDENTIAL AND/OR
HOLD 22 PROPRIETARY TO BP THAT IS NOT TO BE USED, DISCLOSED, OR REPRODUCED IN ANY FORM BY ANY PERSON OR ENTITY OTHER THAN
BP WITHOUT BP'S PRIOR WRITTEN PERMISSION. ALL RIGHTS RESERVED. NOTICE: THESE MATERIALS ARE THE WORK PRODUCT OF
BECHTEL. BECHTEL ACCEPTS NO LIABILITY FOR ANY RELIANCE BY ANY PERSON OTHER THAN ITS CLIENT, BP, ON THE CONTENT OF
THIS WORK PRODUCT. BP HAS EXPRESSLY AUTHORIZED BECHTEL TO ISSUE THIS DISCLAIMER.

PROJECT TITLE
27 24
BP WEST NILE DELTA GAS DEVELOPMENT PROJECT
1 mm 14
CLOSED DRAINS
400 mm
DRAWING TITLE
PIPING & INSTRUMENT DIAGRAM
11R-57-0001-002 9770
3in-R-DC-57-027-B01P-NI 3in-R-DC-20-137-B01TS-NI TO RAVEN RICH MEG
FLASH DRUM E-V-2801.
ONSHORE CONDENSATE SEPARATOR R-V-2030
4106-491-KKD-30 6in-R-MH-20-009-B01TS-NI
10896 11-00-0502-001
1in

FC 2 PHASE FC RASHPETCO SCALE DRG SIZE


B01P B01TS FB
24
2in
FB
24
- A1
1in

1in

1in

1in

57 20 FB DRAWING No.
HOLD 22 DRAWING No. No. of Sheets REV.
(Incl. Sheet No.) EG001-PE-PID-11R-20-0010-001 001 C01

Вам также может понравиться