REFERENCE DATA 1 -- 2

NOTES ON BASIC RATES 3 -- 3

DATA FOR SCHEDULE OF RATES 4 -- 183

PREPARED BY SCHEDULE OF RATES COMMITTEE

JUNE, 2003

0
GATES AND HOISTS

GATE / HOIST AND ALLIED WORKS -- REFERENCE DATA


FOR THE YEAR - 2003-2004
ITEMS : 1 - 31
COST OF MATERIALS :
Acytelene gas per cum Rs: 185.00
Alloy steel ( IS : 1570 ) Shafts per kg Rs: 145.00
Alloy steel ( IS : 1570 ) Pins per kg Rs: 175.00
Bolt / Nut / Washer ( hot dipped galvanized ) per kg Rs: 60.00
Bolt / Nut / Washer ( mild steel ) per kg Rs: 45.00
Bolt / Nut / Washer ( stainless steel ) per kg Rs: 100.00
Bronze / Alluminium alloy ( IS : 305 ) Bearings / Bushes per kg Rs: 380.00
Cast iron blocks per kg Rs: 18.00
Cast steel Drums / Gears per kg Rs: 95.00
Cast steel Pinions per kg Rs: 105.00
Cast steel Wheels / Pulleys / Hubs / Rollers / retainers per kg Rs: 85.00
Chequered plate per kg Rs: 25.20
Coaltar epoxy paint per ltr Rs: 131.00
Degreasing / derusting / phasphate coating chemical per ltr Rs: 175.00
Forged steel Hooks / Shackles per kg Rs: 130.00
Gas cutting set ( 2 Nos 15 m hose and nozzle unit ) Rs: 1125.00
Grease per kg Rs: 90.00
MS pipe 300 mm dia per kg Rs: 30.00
MS pipe 32 mm dia per Rm Rs: 80.00
Oxygen gas per cum Rs: 40.00
Rails 45 kg / m per tonne Rs: 24500.00
Rubber seal ( flat type bottom seal ) IS : 11855 per Rm Rs: 120.00
Rubber seal ( music note teflon claded corner seal ) IS : 11855 per Rm Rs: 600.00
Rubber seal ( music note uncladed corner seal ) IS : 11855 per Rm Rs: 240.00
Rubber seal ( music note teflon claded side seal ) IS : 11855 per Rm Rs: 550.00
Rubber seal ( music note uncladed side seal ) IS : 11855 per Rm Rs: 190.00
Rubber seal ( Z - type side seal ) IS : 11855 per Rm Rs: 240.00
Stainless steel plate / flats per kg Rs: 90.00
Steel wire rope 6x37 construction per kg Rs: 75.00
Structural steel angle / channel / beam / bars per kg Rs: 20.00
Structural steel plate / flats per kg Rs: 24.00
Sundries ( Lump sum rate for unquantified inputs ) Rs: 22.50
Synthetic enamel paint ( 1st quality ) per ltr Rs: 140.00
Welding electrodes 4 mm x 450 mm ( radiographic ) per No. Rs: 4.00
Welding electrodes 4 mm x 450 mm ( radiographic low hydrogen ) per No. Rs: 6.00
Welding electrodes 4 mm x 450 mm ( stainless steel ) per No. Rs: 35.00
Welding holder set ( cable / holder / gloves / mask etc ) per set Rs: 3375.00
Wire brush per Each Rs: 25.00
Zinc per kg Rs: 100.00
Zinc rich ( zinc content : 85 % ) epoxy primer paint per ltr Rs: 525.00
Zinc chromate red oxide primer per ltr Rs: 140.00
Excise duty on cost of supplies % 18.00
Insurance charges % 1.00

LEAD, LOADING & UNLOADING CHARGES: 1 km lead Loading Unloading


Steel per tonne Rs: 25.90 27.70 27.70

1
GATES AND HOISTS

HIRE CHARGES OF MACHINERY: Hire charge Fuel charge Crew charge


Bending machine per hour Rs: 31.00 61.00 26.70
Derric crane ( mobile ) per hour Rs: 261.00 117.00 32.90
Derric crane ( stationary ) per hour Rs: 50.00 5.00 ---
Drilling machine for steel per hour Rs: 15.00 20.00 35.00
Grinder per hour Rs: 15.00 20.00 35.00
Planing machine per hour Rs: 66.00 61.00 42.75
Plate shearing machine per hour Rs: 47.00 82.00 26.70
Pug cutting machine per hour Rs: 13.00 2.00 ---
Tower crane 5 tonne per hour Rs: 763.00 106.00 36.05
Welding transformer per hour Rs: 9.00 49.00 ---

WAGES OF WORKERS: Per day


Electrician Rs: 82.65
Foreman Rs: 108.65
Gas cutter Rs: 93.70
Helper fabrication / erection Rs: 81.60
Khalasi Rs: 83.65
Marker / Erector / Fabricator / Machanic Rs: 93.70
Painter Class-II Rs: 81.60
Welder ( General ) Rs: 93.70
Welder ( X-ray quality ) Rs: 103.07

2
GATES AND HOISTS

NOTES ON SCHEDULE OF RATES


GATE / HOIST AND ALLIED WORKS
FOR THE YEAR : 2003-2004

1. All notes under ' General Notes on Schedule of Rates ' are applicable to ' Gate / Hoist and
Allied Works ' also to the extent they are relevant.

2. All materials / bought out components for embedded parts, gates, hoists and allied works
shall conform to relevant Indian standards / technical specifications and approved drawings.

3. The basic rates are inclusive of preparation of designs / drawings / material schedules etc.,
as per specifications and other technical data including revisions.

4. The basic rates are inclusive of cost of all materials, machinery, labour, fabrication, erection,
commissioning and testing of gates, hoists and other related components as per technical
specifications.

5. The basic rates are inclusive of finishing, wastage of materials , incidental works, temperary
supports, scaffolding, all enabling works, profit, overheads, small tools / plants, hidden cost
on labour etc.

6. The basic rates are inclusive of taxes, duties, levies and all other incidental charges except
sales tax on works contract. Separate provision shall be made in the estimate towards sales
tax on works contract at the rate prevailing at the time of preparation of estimate.

7. The basic rates are inclusive of all leads and lifts including rehandling.

8. Unless otherwise specified the basic rates are inclusive of standard finish required for all the
fabricated and bought out gate and hoist components.

9. The basic rates are inclusive of preparatory works such as rectification of damages, repairing
shop painting, cleaning, positioning and anchoring first stage embedments, cleaning surface
for field painting etc.

10. The basic rates are exclusive of cost of river diversion arrangements, dewatering, desilting
etc., which form part of civil works.

11. Unless otherwise specified the basic rates for items are on per tonne basis. The rate per set or
per number shall be worked out on the basis of rate per tonne and the tonnage computed as
per detailed designs / empirical formulae / similar works.

12. Dry film thickness for zinc rich epoxy primer and coal tar epoxy paints shall be 40 microns per
coat and 100 microns per coat respectively.

3
GATES AND HOISTS

GATE / HOIST AND ALLIED WORKS - DATA RATES

SECTION: GATE / HOIST & ALLIED WORKS. YEAR: 2003-2004 ITEM No: 1

ITEM: Design, fabrication, supply, erection and commissioning of embedded parts consisting of sill
beam, wall plates, anchors, anchor girders, yoke girders, tie flats, trunnion supports, rope and
pulley supports etc., with all accessories for spillway radial gates including cost of all
materials, machinery, labour, aligning, anchoring, welding, finishing, cleaning, applying one
coat of zinc rich epoxy primer and four coats of cold applied coal tar epoxy paint etc., complete
as per specifications and approved drawings with all leads and lifts.

DATA: Embedded parts for radial gate consist of sill beam / wall plates / anchor girders / yoke girders /
tie flats / trunnion supports etc., with all accessories. The weight of embedded parts for radial
gate will be generally at about 25 to 30 percent of weight of radial gate leaf.
Consider embedded parts for radial gate for spillway opening of size 15 m x 9 m for analysis.
Details of material / Gas cutting / Welding considered for rate analysis are based on embedded
parts drawings for 15 m x 9 m spillway opening of Kodasalli dam.
Size of gate for 15 x 9 m spillway opening at crest Length : 15 m Height : 9.75 m
Head of water for sill level 0.6 m below crest : 9.60 m
Weight of radial gate leaf in tonne with end shield and hood based on empirical formula :
Weight of gate in tonnes = 0.0710 x ( L^2 x H x h )^0.673
Where ( L ) is length and ( H ) is height and ( h ) is head of water in metres.
Weight of embedded parts @ 25% = 0.0177 x ( L^2 x H x h )^0.673
= 0.0177 x ( 15 x 15 x 9.75 x 9.6 ) ^ 0.673 : 14.377
The actual weight of embedded parts as per fabrication drawings : 14.334 tonnes
Consider actual weight for data rate analysis.
1. Requirement of materials : as per fabrication drawings ( for details refer Item : 1 of Annexer )
a. Structural steel conforming to IS : 2062 :
Structural steel angles / beams / channels / bars with 2.5 % wastage : 696 kg
Structural steel plates / flats with 2.5 % wastage : 13690 kg
b. Alloy steel conforming to IS : 1570 :
Stainless steel plates / flats : 195.00 kg
c. Bolt / Nut / Washer conforming to IS : 1363 :
MS bolts / nuts with 2.5 % wastage : 112 kg
d. Welding electrodes :
Welding electrodes for stitch welding at 10 % of total with 2.5 % wastage : 665 Nos
Welding electrodes (SS) for stitch welding at 10 % of total with 2.5 % wastage : 66 Nos
Welding electrodes ( LH ) for run welding at 90 % of total with 2.5 % wastage : 5983 Nos
Welding electrodes ( SS ) for run welding at 90 % of total with 2.5 % wastage : 591 Nos
2. Cutting :
Length of cutting assuming cutting for 2 sides as per data sheet : 428 Rm
Add for variations ( cutting for more than 2 sides / odd shapes etc ) at 10 % : 43 Rm
Total length of cutting : 471 Rm
For cutting structural steel sections to required size gas cutting is assumed for cutting angles /
beams / channels / round bars. For plates / flats less than 12 mm in thickness plate shearing
machine and for the remaining sections pug cutting machine is considered.
Length of steel to be cut by using gas manually : 60 m
Length of steel to be cut by gas using pug cutting machine : 371 m
Length of steel to be cut by using shearing machine : 40 m
Time for gas cutting manually assuming average cutting progress of 2 m / hour : 30 hours
Time for gas cutting by pug cutting machine at ( av ) 3 m / hour : 124 hours
Time for cutting by shearing machine at av. 10 m / hour progress : 4 hours
Acetelyne gas @ 0.6 cum / hour ( 154 x 0.60 ) : 92 cum
Oxygen gas @ 1.8 cum / hour ( 154 x 1.80 ) : 276 cum
Use of gas cutting torch with 50 min / hour working ( 30 x 60 / 50 ) : 36 hours

4
GATES AND HOISTS

Use of pug cutting machine with 50 min / hr working ( 124 x 60 / 50 ) : 149 hours
Use of shearing machine with 50 min / hour working ( 4 x 60 / 50 ) : 5 hours
3. Welding :
Length of welding as per data sheet : 600 m
For stich welding @ 2 hrs usage / shift & @ 15 electrodes / hr
( 665 + 66 ) x 8 / 15 / 2 : 195 hours
For run welding @ 6 hrs usage / shift & @ 15 electrodes / hr
( 5983 + 591 ) x 8 / 15 / 6 : 585 hours
Total : 780 hours
Deploy welding transformer for 780 hours.
Fuel / Energy charges @ 25 % hrs for stitch welding & @ 75 % hrs for run welding.
( 195 x 0.25 + 585 x 0.75 ) : 488 hours
4 Planing SS plates for seal seats :
For surface finishing of stainless steel plates for seal seats planing machine is considered.
Length of SS plate for surface finishing by planing machine 56 Rm
Length of planing at a time for 4 m stroke planing machine 3 Rm
Time for planing 3 m length section with 50 min / hour working 8 hours
Time for planing 56 m SS plates ( 56 x 8 / 3 ) 150 hours
5 Surface cleaning and painting :
Painting area for embedded parts at 10 sqm / tonne : 143 sqm
1 coat of zinc rich epoxy primer 40 micron dry film each coat.
Quantity of primer paint for 143 sqm @ 9 sqm / ltr / coat : 16 ltr
4 coats of coal tar epoxy paint 100 micron dry film each coat.
Quantity of coal tar epoxy paint for 143 sqm @ 6 sqm / ltr / coat : 96 ltr
As surface cleaning by sand blasting is hazardous, it is proposed to adopt chemical treatment
to remove grease, rust, scaling etc., and to form phasphate coating to prevent further rusting
before applying primer painting.
Quantity of rust cleaner / inhibitor at 8 sqm / ltr : 18 ltr
6 Requirement of other machinery :
Hiring of tower crane for 4 hours considered for handling yoke / anchor girder parts from river
bed to pier / abutment at trunnion level.
For drilling holes for anchor bolts and for grinding surface / edges of parts requiring finishing
16 hours use of drilling / grinding machine considered.
For handling of parts during fabrication and erection use of mobile derric crane for 32 hours and
stationery derric crane for 64 hours considered.
7 Requirement of work force :
Work component Foreman Marker / Gas cutter / Helper
Fabricator / Welder
Erector /
Cutting sections 190 hours 12 24 24 48
Drilling holes for anchors / supports 1 2 --- 2
Fabricating by stitch welding 195 hours 12 24 --- 48
Run welding 585 hours 7 --- 73 73
Erection of Anchor / Yoke girders 13 26 --- 26
Erection of tie flats 2 2 --- 4
Erection of first stage anchors --- 10 --- 10
Erection of Sill beam / Wall plates 3 3 --- 6
Finishing / cleaning / checking 1 1 --- 2
Total : 51 92 97 219
Note : It is assumed that all stitch welding will be done by fabricator. Hence, no separate provision is
considered for welder for stitch welding.
For surface cleaning by chemical cleaner
and wire brushing at 15 sqm / day : 10 helpers for 143 sqm.
For painting 1 coat primer and 4 coats

5
GATES AND HOISTS

finishing paint at 15 sqm / day : 48 painter Cl-ll & 8 helper for 5 x 143 sqm.
8 Excise duty on supply :
Excise duty is applicable on supply of fabricated parts. The cost of materials is inclusive of all
taxes / duties. Therefore, for purpose of rate analysis 75 percent of total cost excluding the cost
of materials ( assuming 25 % erection cost ) is considered for assessing excise duty.
9 Use rate of materials :
Cost of welding set @ Rs: 3375.00 / Each Rs: 3375.00
Life of welding set : 1000 hours
Use rate of welding set per hour ( cost / life ) Rs: 3.38
Cost of gas cutting set @ Rs: 1125.00 / Each Rs: 1125
Life of gas cutting set : 600 hours
Use rate of gas cutting set per hr ( cost / life ) Rs: 1.88

RATE ANALYSIS UNIT : 14.334 tonne


A. MATERIALS:
Sl No Perticulars Unit Quantity Rate Amount
in Rs. in Rs.
1 Str steel angle / beam / channel / bars kg 696.00 20.00 13920.00
2 Structural steel plate / flats kg 13690.00 24.00 328560.00
3 Stainless steel plate / flats kg 195.00 90.00 17550.00
4 MS bolts and nuts kg 112.00 45.00 5040.00
5 Oxygen gas cum 276.00 40.00 11040.00
6 Acetyline gas cum 92.00 185.00 17020.00
7 Welding electrodes Nos 665.00 4.00 2660.00
8 Welding electrodes ( LH ) Nos 5983.00 6.00 35898.00
9 Welding electrodes ( stainless steel ) Nos 657.00 35.00 22995.00
10 Zinc rich epoxy primer ltr 16.00 525.00 8400.00
11 Coal tar epoxy paint ltr 96.00 131.00 12576.00
12 Rust cleaner / inhibitor ltr 18.00 175.00 3150.00
13 Use rate welding holder set Hour 780.00 3.38 2632.50
14 Use rate gas cutting torch set Hour 36.00 1.88 67.50
15 Wire brush Nos 2.00 25.00 50.00
16 Sundries LS 100.00 22.50 2250.00
TOTAL Rs: 483809.00
Add for small Tools and Plants @ 1% Rs: 4838.09
Add for Contractor' Profit @ 10% Rs: 48380.90
Add for Contrators' Overheads @ 5% Rs: 24190.45
Total cost of Materials Rs: 561218.44

B. MACHINERY:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Welding transformer Hour 780.00 9.00 7020.00
Fuel / Energy charges Hour 488.00 49.00 23912.00
2 Tower crane Hour 4.00 763.00 3052.00
Fuel / Energy charges Hour 4.00 106.00 424.00
3 Plate shearing machine Hour 5.00 47.00 235.00
Fuel / Energy charges Hour 5.00 82.00 410.00
4 Pug cutting machine Hour 149.00 13.00 1937.00
Fuel / Energy charges Hour 149.00 2.00 298.00
5 Mobile derric crane Hour 32.00 261.00 8352.00
Fuel / Energy charges Hour 32.00 117.00 3744.00
6 Stationery derric crane Hour 64.00 50.00 3200.00
Fuel / Energy charges Hour 64.00 5.00 320.00

6
GATES AND HOISTS

7 Grinding machine Hour 16.00 15.00 240.00


Fuel / Energy charges Hour 16.00 20.00 320.00
8 Drilling machines Hour 16.00 15.00 240.00
Fuel / Energy charges Hour 16.00 20.00 320.00
9 Planing machine Hour 150.00 66.00 9900.00
Fuel / Energy charges Hour 150.00 61.00 9150.00
10 Sundries LS 100.00 22.50 2250.00
TOTAL Rs: 75324.00
Add for small Tools and Plants @ 1% Rs: 753.24
Add for Contractor' Profit on DPOL / Energy @ 10% Rs: 4114.80
Add for Contrators' Overheads @ 5% Rs: 3766.20
Total hire charges of Machinery Rs: 83958.24

C. LABOUR:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Crew for Tower crane Hour 4.00 36.05 144.20
2 Crew for Mobile crane Hour 32.00 32.90 1052.80
3 Crew for Shearing machine Hour 5.00 26.70 133.50
4 Crew for Planing machine Hour 150.00 42.75 6412.50
5 Crew for Drilling machine Hour 16.00 35.00 560.00
6 Crew for Grinding machine Hour 16.00 35.00 560.00
7 Foreman Day 51.00 108.65 5541.15
8 Marker / Fabricator / Erector Day 92.00 93.70 8620.40
9 Gas cutter Day 24.00 93.70 2248.80
10 Welder ( General ) Day 66.00 93.70 6184.20
11 Welder ( X - ray ) Day 7.00 103.07 721.49
12 Khalasi Day 50.00 83.65 4182.50
13 Helper fabrication / erection Day 219.00 81.60 17870.40
14 Helper for cleaning / painting Day 18.00 81.60 1468.80
15 Painter Cl - II Day 48.00 81.60 3916.80
16 Electrician Day 5.00 82.65 413.25
TOTAL Rs: 60030.79
Add for small Tools and Plants @ 1% Rs: 600.31
Add for Contractor' Profit @ 10% Rs: 6003.08
Add for hidden cost on Labour @ 15% Rs: 9004.62
Add for additional hidden cost on labour @ 15% Rs: 9004.62
Add for Contrators' Overheads @ 5% Rs: 3001.54
Total cost of Labour Rs: 87644.95

ABSTRACT:
A. Cost of Materials Rs: 561218.44
B. Hire charges of Machinery Rs: 83958.24
C. Cost of Labour Rs: 87644.95
Total Rs: 732821.63
Add for excise duty on 75 percent cost
excluding cost of materials @ 18.00% Rs: 23166.43
Add for insurance charges @ 1.00% Rs: 7328.22
Add for designs and drawings @ 2.5% Rs: 18320.54
Add for zigs / supports / winches / chain-pulley @ 2.5% Rs: 18320.54
Add for power supply arrangements @ 2.5% Rs: 18320.54
Add for enabling works @ 2% Rs: 14656.43
Total Rs: 832934.34

7
GATES AND HOISTS

Add for 2 rehandling leads for 1 km including loading and unloading :


Fabricated parts 2x14.334 tonnes @ Rs: 81.30 / tonne Rs: 2330.71
Add for transportation upto work site @ 3% Rs: 24988.03
Total cost for 14.334 tonne Rs: 860253.07
Rate per tonne Rs: 60010.00

SECTION: GATE / HOIST & ALLIED WORKS. YEAR: 2003-2004 ITEM No: 2

ITEM: Design, fabrication, supply, erection, testing and commissioning of radial gate consisting
of skin plate, stiffeners, horizontal girders, sector arms, trunnion assemblies, tie beam, pulley
supports, bracings, rubber seals, clamps etc., with all accessories for spillway including cost
of all materials, machinery, labour, cutting, bending, aligning, anchoring, welding, finishing,
cleaning, applying one coat of zinc rich epoxy primer and three coats of cold applied coal tar
epoxy paint, seal fixing etc., complete as per specifications and approved drawings with all
leads and lifts.

DATA: Spillway radial gate consists of trunnions / sector arms / horizontal girders / Tee- supports /
skin plate / tie beam / bracings for horizontal girders and sector arms / pulley blocks / seals /
end shields etc., with all accessories.
Sector arms are connected to trunions by bolts and nuts with zinc padding in between.
Horizontal girders generally spaced at about 3 m apart are joined to sector arms by welding and
are stiffened by vertical and diagonal stiffeners to form the main frame. Tee- sections are welded
to horizontal girders to make the frame regid and to support the skin plate. Skin plate is welded
to Tee-supports generally spaced vertically at about 40 cm apart.
Consider radial gate for spillway opening of size 15 m x 9 m for analysis.
Details of material / Gas cutting / Welding considered for rate analysis are based on radial gate
drawings for 15 m x 9 m spillway opening of Kodasalli dam with sill level 0.9 m below crest.
Length : 15.00 m height : 9.75 m Head of water above sill : 9.60 m
Weight of gate leaf in tonne with end shield and hood based on empirical formula :
Weight of gate in tonnes = 0.0710 x ( L^2 x H x h )^0.673
Where ( L ) is length and ( H ) is height and ( h ) is head of water in metres.
= 0.0710 x ( 15^2 x 9.75 x 9.6 )^0.673 : 57.669
The actual weight of radial gate leaf as per fabrication drawings : 57.457 tonnes
Consider actual weight for data rate analysis.
1. Requirement of materials : as per fabrication drawings ( for details refer Item : 2 of Annexer )
a. Structural steel conforming to IS : 2062 :
Structural steel angles / beams / channels / bars with 2.5 % wastage 15806 kg
Structural steel plates / flats with 2.5 % wastage : 38672 kg
b. Alloy steel components conforming to IS : 1570 :
Stainless steel plates : 6 kg
Lifting pins : 1098 kg
c. Cast steel components conforming to IS : 1030 :
Trunnion hub / Guide roller : 1895 kg
d. Alluminium / Bronze alloy components conforming to IS : 305 :
Trunnion bush / Guide roller bush : 1155 kg
e. Bolts / Nuts / Washers conforming to IS : 1363 :
GI bolts / nuts / washers with 2.5 % wastage : 78 kg
MS bolts / nuts / washers with 2.5 % wastage : 79 kg
f. Zinc at 70 kg / trunnion ( 2 x 70 ) : 140 kg
g. Rubber seal conforming to IS : 11855 :
Bottom seal ( flat type )with wastage : 15.5 Rm
Side seals ( Z - type ) with wastage : 25 Rm

8
GATES AND HOISTS

h. Welding electrodes :
Welding electrodes for stitch welding at 10 % of total with 2.5 % wastage : 2728 Nos
Welding electrodes ( LH ) for run welding at 90 % of total with 2.5 % wastage : 24554 Nos
2. Cutting :
Length of cutting assuming cutting for 2 sides : 928 Rm
Add for variations ( cutting for more than 2 sides / odd shapes etc ) at 10 % : 93 Rm
Total : 1021 Rm
For cutting structural steel sections to required sizes gas cutting is assumed for cutting angles/
beams / channels / round bars and for thick plates / flats. For plate / flats less than 12 mm
thick use of shearing machine is assumed to the extent feasible.
Length of steel to be cut by using gas manually : 350 m
Length of steel to be cut by gas using pug cutting machine : 571 m
Length of steel to be cut by using shearing machine : 100 m
Time for gas cutting manually assuming average cutting progress of 2 m / hour : 175 hours
Time for gas cutting by pug cutting machine at ( av ) 3 m / hour : 190 hours
Time for cutting by shearing machine at av. 10 m / hr progress : 10 hours
Acetelyne gas @ 0.6 cum / hour ( 365 x 0.60 ) : 219 cum
Oxygen gas @ 1.8 cum / hour ( 365 x 1.80 ) : 657 cum
Use of gas cutting torch with 50 min / hr working ( 175 x 60 / 50 ) : 210 hours
Use of pug cutting machine with 50 min / hr working ( 190 x 60 / 50 ) : 228 hours
Use of shearing machine with 50 min / hr working ( 10 x60 / 50 ) : 12 hours
3. Bending :
Assuming 1.2 m wide plates, length of plate for bending ( 15 x 11 / 1.2 ) : 137.50 m
Length of Tee sections @ 0.4 m spacing ( 15 x 11 / 0.4 ) : 412.50 m
Length of side seal base and cover flats ( 11 x 2 x 2 ) : 44.00 m
Total ( say ) : 594.00 m
Assuming 3 m bending / hour, time for bending 594 m ( 594 / 3 ) : 198 hours
With 50 minutes / hour working deploy bending machine for : 238 hours
4. Welding :
Length of welding : 2294 Rm
For radial gates where field welding is more hourly progress is assumed at 12 electrodes / hour.
For stich welding @ 2 hrs usage / shift & @ 12 electrodes / hr
( 2728 / 12 ) x 8 / 2 : 909 hours
For run welding @ 6 hrs usage / shift & @ 12 electrodes / hr
( 24554 / 12 ) x 8 / 6 : 2728 hours
Total : 3637 hours
Deploy welding transformer for 3637 hours.
Fuel / Energy charges @ 25 % hrs for stitch welding & @ 75 % hrs for run welding.
( 909 x 0.25 + 2728 x 0.75 ) : 2273 hours
5. Surface cleaning and painting :
Painting area for radial gate at 20 sqm / tonne : 1150 sqm
1 coat of zinc rich epoxy primer 40 micron dry film each coat.
Quantity of primer paint for 1150 sqm @ 9 sqm / ltr / coat : 128 ltr
3 coats of coal tar epoxy paint 100 micron dry film each coat.
Quantity of coal tar epoxy paint for 1150 sqm @ 6 sqm / ltr / coat : 575 ltr
As surface cleaning by sand blasting is hazardous, it is proposed to adopt chemical treatment
to remove grease, rust, scaling etc., and to form phasphate coating to prevent further rusting
before applying primer painting.
Quantity of rust cleaner / inhibitor at 8 sqm / ltr : 144 ltr
6. Requirement of other machinery :
For lifting and placing in position sector arms / horizontal girders / tie beam 10 hours use of
tower crane considered.
For drilling holes in skin plate and seal clamps for seal fixing 50 hours use of drilling machine
considered.

9
GATES AND HOISTS

For grinding and finishing weld joints in skin plate and other locations 50 hours use of grinding
machine considered.
For handling during fabrication and erection of gate parts mobile derric crane for 150 hours and
stationery derric crane for 300 hours considered.
7. Requirement of work force :
Work component Foreman Marker / Gas cutter / Helper
Fabricator / Welder
Erector
Cutting sections 450 hours 28 56 56 112
Drilling holes for seal fixing 3 6 --- 12
Fabricating by stitch welding 909 hours 57 114 --- 456
Run welding 2728 hours 34 --- 341 341
Erection of trunnion and tie beam 4 8 --- 32
Erection of Horizontal girders 3 3 --- 12
Erection of sector arms 3 3 --- 12
Erection of vertical stiffeners 5 10 --- 40
Erection of skin plates 3 6 --- 24
Erection of end sheilds and hood 4 8 --- 32
Erection of bracings 6 6 --- 24
Molten zinc filling for trunnion supports 2 2 --- 2
Seal fixing 2 2 --- 4
Finishing / cleaning / checking 1 2 --- 2
Total : 155 226 397 1105
Note : It is assumed that all stitch welding will be done by fabricator. Hence, no separate provision is
considered for welder for stitch welding.
For surface cleaning by chemical cleaner
and wire brushing at 15 sqm / day : 77 helpers for 1150 sqm
For painting 1 coat primer and 3 coats
finishing paint at 15 sqm / day : 306 painter Cl-ll & 77 helper for 4 x 1150 sqm
8. Excise duty on supply :
Excise duty is applicable on supply of fabricated parts. The cost of materials is inclusive of all
taxes/ duties. Therefore, for purpose of rate analysis 75 percent of total cost excluding the cost
of materials ( assuming 25 % of machinery and labour components for erection ) is considered
for assessing excise duty.
9. Use rate of materials :
Cost of welding set @ Rs: 3375.00 / Each Rs: 3375.00
Life of welding set : 1000 hours
Use rate of welding set per hour ( cost / life ) Rs: 3.38
Cost of gas cutting set @ Rs: 1125.00 / Each Rs: 1125
Life of gas cutting set : 600 hours
Use rate of gas cutting set per hr ( cost / life ) Rs: 1.88

RATE ANALYSIS UNIT : 57.457 tonne


A. MATERIALS:
Sl No Perticulars Unit Quantity Rate Amount
in Rs. in Rs.
1 Structural steel :
Angles / beams / channels / bars kg 15806.00 20.00 316120.00
Plates / flats kg 38672.00 24.00 928128.00
2 Cast steel components :
Trunnion hubs / Guide rollers kg 1895.00 85.00 161075.00
3 Alloy steel components :
Stainless steel plate kg 6.00 90.00 540.00
Trunnion pins kg 1098.00 175.00 192150.00

10
GATES AND HOISTS

4 Alluminium / Bronze alloy components :


Bush for Trunnion / Guide roller kg 1155.00 380.00 438900.00
5 Bolt / Nut / Washer :
GI bolts / nuts / washers kg 78.00 60.00 4680.00
MS bolts / nuts / washers kg 79.00 45.00 3555.00
6 Zinc kg 140.00 100.00 14000.00
7 Rubber seals :
Bottom seal Rm 15.50 120.00 1860.00
Side seals ( Z - type ) Rm 25.00 240.00 6000.00
8 Oxygen gas cum 657.00 40.00 26280.00
9 Acetyline gas cum 219.00 185.00 40515.00
10 Welding electrodes ( std ) Nos 2728.00 4.00 10912.00
11 Welding electrodes ( LH ) Nos 24554.00 6.00 147324.00
12 Zinc rich epoxy primer ltr 128.00 525.00 67200.00
13 Coal tar epoxy paint ltr 575.00 131.00 75325.00
14 Rust cleaner / inhibitor ltr 144.00 175.00 25200.00
15 Use rate welding holder set Hour 3637.00 3.38 12274.88
16 Use rate gas cutting torch set Hour 210.00 1.88 393.75
17 Wire brush Nos 12.00 25.00 300.00
18 Sundries LS 1000.00 22.50 22500.00
TOTAL Rs: 2495232.63
Add for small Tools and Plants @ 1% Rs: 24952.33
Add for Contractor' Profit @ 10% Rs: 249523.26
Add for Contrators' Overheads @ 5% Rs: 124761.63
Total cost of Materials Rs: 2894469.85

B. MACHINERY:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Welding transformer Hour 3637.00 9.00 32733.00
Fuel / Energy charges Hour 2273.00 49.00 111377.00
2 Plate shearing machine Hour 12.00 47.00 564.00
Fuel / Energy charges Hour 12.00 82.00 984.00
3 Pug cutting machine Hour 228.00 13.00 2964.00
Fuel / Energy charges Hour 228.00 2.00 456.00
4 Bending machine Hour 238.00 31.00 7378.00
Fuel / Energy charges Hour 238.00 61.00 14518.00
5 Tower crane 5 t cpacity Hour 10.00 763.00 7630.00
Fuel / Energy charges Hour 10.00 106.00 1060.00
6 Mobile derric crane Hour 150.00 261.00 39150.00
Fuel / Energy charges Hour 150.00 117.00 17550.00
7 Stationery derric crane Hour 300.00 50.00 15000.00
Fuel / Energy charges Hour 300.00 5.00 1500.00
8 Grinding machine Hour 50.00 15.00 750.00
Fuel / Energy charges Hour 50.00 20.00 1000.00
9 Drilling machines Hour 50.00 15.00 750.00
Fuel / Energy charges Hour 50.00 20.00 1000.00
10 Sundries LS 1000.00 22.50 22500.00
TOTAL Rs: 278864.00
Add for small Tools and Plants @ 1% Rs: 2788.64
Add for Contractor' Profit on DPOL / Energy @ 10% Rs: 17194.50
Add for Contrators' Overheads @ 5% Rs: 13943.20
Total hire charges of Machinery Rs: 312790.34

11
GATES AND HOISTS

C. LABOUR:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Crew for Mobile crane Hour 150.00 32.90 4935.00
2 Crew for Tower crane Hour 10.00 36.05 360.50
3 Crew for Bending machine Hour 238.00 26.70 6354.60
4 Crew for Drilling machine Hour 50.00 35.00 1750.00
5 Crew for Grinding machine Hour 50.00 35.00 1750.00
6 Foreman Day 155.00 108.65 16840.75
7 Marker / Fabricator / Erector Day 226.00 93.70 21176.20
8 Gas cutter Day 56.00 93.70 5247.20
9 Welder ( General ) Day 307.00 93.70 28765.90
10 Welder ( X - ray ) Day 34.00 103.07 3504.38
11 Khalasi Day 250.00 83.65 20912.50
12 Helper fabrication / erection Day 1105.00 81.60 90168.00
13 Helper for cleaning / painting Day 154.00 81.60 12566.40
14 Painter Cl - II Day 306.00 81.60 24969.60
15 Electrician Day 30.00 82.65 2479.50
TOTAL Rs: 241780.53
Add for small Tools and Plants @ 1% Rs: 2417.81
Add for Contractor' Profit @ 10% Rs: 24178.05
Add for hidden cost on Labour @ 15% Rs: 36267.08
Add for additional hidden cost on labour @ 15% Rs: 36267.08
Add for Contrators' Overheads @ 5% Rs: 12089.03
Total cost of Labour Rs: 352999.57

ABSTRACT:
A. Cost of Materials Rs: 2894469.85
B. Hire charges of Machinery Rs: 312790.34
C. Cost of Labour Rs: 352999.57
Total Rs: 3560259.76
Add for excise duty on 75 percent cost
excluding cost of materials @ 18.00% Rs: 89881.64
Add for insurance charges @ 1.00% Rs: 35602.60
Add for designs and drawings @ 2.5% Rs: 89006.49
Add for zigs / supports / winches / chain-pulley @ 2.5% Rs: 89006.49
Add for power supply arrangements @ 2.5% Rs: 89006.49
Add for enabling works @ 2% Rs: 71205.20
Total Rs: 4023968.67
Add for 2 rehandling leads for 1 km including loading and unloading :
Fabricated parts 2x57.457 tonnes @ Rs: 81.30 / tonne Rs: 9342.51
Add for transportation upto work site @ 3% Rs: 120719.06
Total cost for 57.457 tonne Rs: 4154030.24
Rate per tonne Rs: 72300.00

SECTION: GATE / HOIST & ALLIED WORKS. YEAR: 2003-2004 ITEM No: 3

ITEM: Design, fabrication, supply, erection, testing and commissioning of electrically operated rope
drum hoist of adequate capacity consisting of base frames, rope drums,connecting shaft, gear
system, brake system, electric motor, wire ropes, gate position indicator, manual operation
arrangement etc., with all accessories for spillway radial gate including cost of all materials,
machinery, labour, aligning, anchoring, welding, finishing, cleaning, greasing, providing hand
railing and approach staircase with gate to hoist platform, applying two coats of zinc chromate
red oxide primer and three coats of approved synthetic enamel paint etc., complete as per

12
GATES AND HOISTS

specifications and approved drawings with all leads and lifts.

DATA: Rope drum hoist for radial gate consists of embedded parts for anchorages, hoist supporting
structure, pulley supporting structures, pulleys, drive stool, rope drums, couplings, shafts,
gears and pinions, plummer blocks, worm reducer, floating shaft, electric motor, hand operation
assembly, brake, wire rope, gate position indicator, switch box etc. with related accessories.
Consider rope drum hoist for radial gate for spillway opening of size 15 m x 9 m for analysis.
Details of material / Gas cutting / Welding considered for rate analysis are based on rope drum
hoist drawings for 15 m x 9 m spillway opening of Kodasalli dam.
Weight of gate leaf in tonne for 15 m x 9 m spillway opening based on empirical formula :
Size of gate for 15 x 9 m spillway opening: Length :15 m Height :9.75 m
Weight of radial gate leaf in tonne for 9.6 m water head based on empirical formula :
Weight of gate in tonnes = 0.0710 x ( L^2 x H x h )^0.673
Where ( L ) is length and ( H ) is height and ( h ) is head of water in metres.
= 0.0710 x ( 15^2 x 9.75 x 9.6 )^0.673 : 57.669
Hoist capacity including 25 % reserve capacity : 1.5 x Weight of gate in tonne
Capacity of hoist required in tonnes : 1.5 x 57.669 : 86.504
Hoist capacity shall be rounded off to next 10 tonne say : 90.00 tonnes
Actual capacity of hoist provided : 90.00 tonnes
Weight of hoist with all accessories is assumed at 0.175 tonne per tonne capacity of hoist.
Weight of hoist with all accessories ( 0.175 x 90 ) : 15.750 tonnes
The actual weight of spillway radial gate rope drum hoist as per data sheet : 15.440 tonnes
Consider actual weight for data rate analysis.
1. Requirement of materials : as per fabrication drawings ( for details refer Item : 3 of Annexer )
a. Structural steel conforming to IS : 2062 :
Angles / Beams / Channels / Bars with 2.5 % wastage : 2571.00 kg
Plates / Flats with 2.5 % wastage : 3632.00 kg
b. Cast steel components conforming to IS : 1030 :
Rope drums 2 Nos / Gears 4 Nos : 3680.00 kg
Pinions : 218.00 kg
Pulleys 720 PCD 6 Nos : 1080.00 kg
Plummer blocks / Hubs : 322.00 kg
c. Alloy steel components conforming to IS : 1570 :
Shafts ( carbon steel ) : 557.00 kg
Pins ( stainless steel ) 546.00 kg
d. Alluminium/ Bronze alloy components conforming to IS : 305 :
Bearings / Bush : 144.00 kg
e. Bolt / Nut / Washers conforming to IS : 1363 :
MS Bolts / Nuts / Washers with 2.5 % wastage : 85.00 kg
f. Steel wire rope conforming to IS : 2266 :
36 mm dia 6 / 37 construction 2 Nos 50 m each @ 4.48 kg / Rm : 448 kg
g. Other components :
Manual operation assembly : 1 No.
Worm reducer : 1 Nos
Electric motor 20 hp : 1 No.
Gate position indicator : 1 No.
Ele-magnetic brake : 1 No.
Wire rope sockets : 2 Nos
MS pipe 300 mm dia 13.32 Rm @ 75 kg / Rm : 1000 kg
Electric cable / switch / control panel etc : 1 set
h. Welding electrodes :
Welding electrodes for stitch welding at 10 % of total with 2.5 % wastage : 530 Nos

13
GATES AND HOISTS

Welding electrodes ( LH ) for run welding at 90 % of total with 2.5 % wastage : 4776 Nos
2. Cutting :
Length of cutting assuming cutting for 2 sides : 255 Rm
Add for variations ( cutting for more than 2 sides / odd shapes etc ) at 10 % : 25 Rm
Total : 280 Rm
For cutting structural steel sections to required sizes gas cutting is assumed.
Length of steel to be cut by using gas manually : 150 m
Length of steel to be cut by gas using pug cutting machine : 130 m
Time for gas cutting manually assuming average cutting progress of 2 m / hour : 75 hours
Time for gas cutting by pug cutting machine at ( av ) 3 m / hour : 44 hours
Acetelyne gas @ 0.6 cum / hour ( 119 x 0.60 ) : 71 cum
Oxygen gas @ 1.8 cum / hour ( 119 x 1.80 ) : 213 cum
Use of gas cutting torch with 50 min / hr working ( 75 x 60 / 50 ) : 90 hours
Use of pug cutting machine with 50 min / hr working ( 44 x 60 / 50 ) : 53 hours
3. Welding :
Length of welding : 447 Rm
For stich welding @ 2 hrs usage / shift & @ 15 electrodes / hr
( 530 / 15 ) x 8 / 2 : 141 hours
For run welding @ 6 hrs usage / shift & @ 15 electrodes / hr
( 4776 / 15 ) x 8 / 6 : 425 hours
Total : 566 hours
Deploy welding transformer for 566 hours.
Fuel / Energy charges @ 25 % hrs for stitch welding & @ 75 % hrs for run welding.
( 141 x 0.25 + 425 x 0.75 ) : 354 hours
4. Surface cleaning and painting :
Quantity of structural steel requiring cleaning for painting : 6.2 tonnes
Painting area for hoist at 20 sqm / t of str steel ( 6.2 x 20 ) : 124 sqm
2 coats of zinc chromate red oxide primer.
Quantity of primer paint for 124 sqm @ 12 sqm / ltr / coat : 21 ltr
3 coats of synthetic enamel paint.
Quantity of synthetic enamel paint for 124 sqm @ 12 sqm / ltr / coat : 31 ltr
As surface cleaning by sand blasting is hazardous, it is proposed to adopt chemical treatment
to remove grease, rust, scaling etc., and to form phasphate coating to prevent further rusting
before applying primer painting.
Quantity of rust cleaner / inhibitor at 8 sqm / ltr : 16 ltr
5. Requirement of other machinery :
For lifting and placing in position hoist drums, worm reducers, gears, floating shafts etc deploy
tower crane for 4 hours.
For handling and erection mobile derric crane for 50 hours considered.
For drilling holes for bolts 16 hours use of drilling machine considered.
For grinding and finishing weld joints 8 hours use of grinding machine considered
6. Requirement of work force :
Work component Foreman Marker / Gas cutter / Helper
Fabricator / Welder
Erector
Cutting sections 143 hours 9 18 18 36
Drilling holes for pins / bolts fixing 1 2 --- 2
Fabricating by stitch welding 141 hours 9 18 --- 36
Run welding 425 hours 5 --- 53 53
Erection of anchors 2 2 --- 4
Erection of drums and gears 2 4 --- 16
Erection of floating shaft / pulleys 1 2 --- 4
Erection of worm reducers / brake / motor 1 2 --- 4
Erection of other accessories 1 2 --- 2

14
GATES AND HOISTS

Erection of control panel / cabling 1 1 --- 2


Checking and trial running without ropes 1 2 --- 4
Rope fixing and checking 1 2 --- 8
Finishing / cleaning --- 1 --- 2
Trial running for lifting / lowering gate 1 2 --- 2
Total : 35 58 71 175
Note : It is assumed that all stitch welding will be done by fabricator. Hence, no separate provision is
considered for welder for stitch welding.
For surface cleaning by chemical cleaner
and wire brushing at 15 sqm / day : 8 helpers for 124 sqm
For painting 2 coats primer and 3 coats
finishing paint at 20 sqm / day : 30 painter Cl-ll & 6 helpers for 5x124 sqm
7. Excise duty on supply :
Excise duty is applicable on supply of fabricated parts. The cost of materials is inclusive of all
taxes/ duties. Therefore, for purpose of rate analysis 75 percent of total cost excluding the cost
of materials ( assuming 25 % erection cost ) is considered for assessing excise duty.
8. Use rate of materials :
Cost of welding set @ Rs: 3375.00 / Each Rs: 3375.00
Life of welding set : 1000 hours
Use rate of welding set per hour ( cost / life ) Rs: 3.38
Cost of gas cutting set @ Rs: 1125.00 / Each Rs: 1125
Life of gas cutting set : 600 hours
Use rate of gas cutting set per hr ( cost / life ) Rs: 1.88

RATE ANALYSIS UNIT : 15.440 tonne wt


A. MATERIALS: 90.00 t capacity
Sl No Perticulars Unit Quantity Rate Amount
in Rs. in Rs.
1 Structural steel
Angles / beams / channels / bars kg 2571.00 20.00 51420.00
Plates / flats kg 3632.00 24.00 87168.00
2 Cast steel components :
Rope drums 2 Nos / Gears 4 Nos kg 3680.00 95.00 349600.00
Pinions kg 218.00 105.00 22890.00
Pulleys 720 PCD 6 Nos kg 1080.00 85.00 91800.00
Plummer blocks / Hubs kg 322.00 85.00 27370.00
3 Alloy steel components
Shafts kg 557.00 145.00 80765.00
Pins kg 546.00 175.00 95550.00
4 Bronze alloy components :
Bronze bearings / bush kg 144.00 380.00 54720.00
5 Wire rope 36 mm dia 6/37 construction kg 448.00 75.00 33600.00
6 MS Bolt / Nut / Washer kg 85.00 45.00 3825.00
7 Worm reducers No. 1.00 45000.00 45000.00
8 Electric motor 20 hp No. 1.00 28125.00 28125.00
9 Floating shaft 300 mm dia kg 1000.00 30.00 30000.00
10 Manual operating system No. 1.00 8437.50 8437.50
11 Gate position indicator No. 1.00 8437.50 8437.50
12 Ele-magnetic brake No. 1.00 11250.00 11250.00
13 Electric cable / switch / control panel etc LS 1.00 11250.00 11250.00
14 Oxygen gas cum 213.00 40.00 8520.00
15 Acetyline gas cum 71.00 185.00 13135.00
16 Welding electrodes Nos 530.00 4.00 2120.00
17 Welding electrodes ( LH ) Nos 4776.00 6.00 28656.00

15
GATES AND HOISTS

18 Zinc chromate red oxide primer ltr 21.00 140.00 2940.00


19 Synthetic enamel ( 1st quality ) paint ltr 31.00 140.00 4340.00
20 Rust cleaner / inhibitor ltr 16.00 175.00 2800.00
21 Grease kg 50.00 90.00 4500.00
22 Use rate welding holder set Hour 566.00 3.38 1910.25
23 Use rate gas cutting torch set Hour 90.00 1.88 168.75
24 Wire brush Nos 3.00 25.00 75.00
25 Sundries ( hand rail /staircase / gate etc ) LS 200.00 22.50 4500.00
TOTAL Rs: 1114873.00
Add for small Tools and Plants @ 1% Rs: 11148.73
Add for Contractor' Profit @ 10% Rs: 111487.30
Add for Contrators' Overheads @ 5% Rs: 55743.65
Total cost of Materials Rs: 1293252.68

B. MACHINERY:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Welding transformer Hour 566.00 9.00 5094.00
Fuel / Energy charges Hour 353.00 49.00 17297.00
2 Tower crane 5 t capacity Hour 4.00 763.00 3052.00
Fuel / Energy charges Hour 4.00 106.00 424.00
3 Pug cutting machine Hour 53.00 13.00 689.00
Fuel / Energy charges Hour 53.00 2.00 106.00
4 Mobile derric crane Hour 50.00 261.00 13050.00
Fuel / Energy charges Hour 50.00 117.00 5850.00
5 Grinding machine Hour 8.00 15.00 120.00
Fuel / Energy charges Hour 8.00 20.00 160.00
6 Drilling machines Hour 16.00 15.00 240.00
Fuel / Energy charges Hour 16.00 20.00 320.00
7 Sundries LS 100.00 22.50 2250.00
TOTAL Rs: 48652.00
Add for small Tools and Plants @ 1% Rs: 486.52
Add for Contractor' Profit on DPOL / Energy @ 10% Rs: 2640.70
Add for Contrators' Overheads @ 5% Rs: 2432.60
Total hire charges of Machinery Rs: 54211.82

C. LABOUR:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Crew for Mobile crane Hour 50.00 32.90 1645.00
2 Crew for Tower crane Hour 4.00 36.05 144.20
3 Crew for Drilling machine Hour 16.00 35.00 560.00
4 Crew for Grinding machine Hour 8.00 35.00 280.00
5 Foreman Day 35.00 108.65 3802.75
6 Marker / Fabricator / Erector / Mechanic Day 58.00 93.70 5434.60
7 Gas cutter Day 18.00 93.70 1686.60
8 Welder ( General ) Day 53.00 93.70 4966.10
9 Khalasi Day 20.00 83.65 1673.00
10 Helper fabrication / erection Day 175.00 81.60 14280.00
11 Helper for cleaning / painting Day 14.00 81.60 1142.40
12 Painter Cl - II Day 30.00 81.60 2448.00
13 Electrician Day 3.00 82.65 247.95
TOTAL Rs: 38310.60
Add for small Tools and Plants @ 1% Rs: 383.11

16
GATES AND HOISTS

Add for Contractor' Profit @ 10% Rs: 3831.06


Add for hidden cost on Labour @ 15% Rs: 5746.59
Add for additional hidden cost on labour @ 15% Rs: 5746.59
Add for Contrators' Overheads @ 5% Rs: 1915.53
Total cost of Labour Rs: 55933.48

ABSTRACT:
A. Cost of Materials Rs: 1293252.68
B. Hire charges of Machinery Rs: 54211.82
C. Cost of Labour Rs: 55933.48
Total Rs: 1403397.98
Add for excise duty on 75 percent cost
excluding cost of materials @ 18.00% Rs: 14869.61
Add for insurance charges @ 1.00% Rs: 14033.98
Add for designs and drawings @ 2.5% Rs: 35084.95
Add for zigs / supports / winches / chain-pulley @ 2.5% Rs: 35084.95
Add for power supply arrangements @ 2.5% Rs: 35084.95
Add for enabling works @ 2% Rs: 28067.96
Total Rs: 1565624.38
Add for 2 rehandling leads for 1 km including loading and unloading :
Fabricated parts 2x15.44 tonnes @ Rs: 81.30 / tonne Rs: 2510.54
Add for transportation upto work site @ 3% Rs: 46968.73
Total cost for 15.440 tonne wt Rs: 1615103.65
90.000 t capacity
Rate per tonne wt Rs: 104610.00
Rate per tonne capacity of hoist Rs: 17950.00

SECTION: GATE / HOIST & ALLIED WORKS. YEAR: 2003-2004 ITEM No: 4

ITEM: Design, fabrication, supply, erection and commissioning of 1 metre wide catwalk connecting
spillway piers / abutments at trunnion platform level including cost of all materials,
machinery, labour, cutting, aligning, anchoring, welding, finishing, cleaning, applying one coat
of zinc rich epoxy primer and two coats of cold applied coal tar epoxy paint etc., complete as
per specifications and approved drawings with all leads and lifts.

DATA: Catwalk at trunnion level generally consists of 1 m wide structural steel bridge spanning across
piers / abutments for maintenance of gate parts at trunnion level.
Consider catwalk for a clear span of 15 m and 3 m wide piers.
Details of material / Gas cutting / Welding considered for rate analysis are based on foot bridge
drawings for 15 m x 9 m radial gate of Alamatti dam.
Weight of catwalk for 18 m length ( C / C of piers ) @ 0.3 t / m : 5.400 t
The actual weight of catwalk ( foot bridge ) as per data sheet : 5.318 t
Consider actual weight for data rate analysis.
1. Requirement of materials : as per fabrication drawings ( for details refer Item : 4 of Annexer )
a. Structural steel conforming to IS : 2062 :
Structural steel angles / beams / channels / bars with 2.5 % wastage : 4258 kg
Structural steel plates / flats with 2.5 % wastage : 98 kg
Chequered plates with 2.5 % wastage : 856 kg
b. Bolts / Nuts / Washers conforming to IS : 1363 :
MS bolts / nuts / washers with 2.5 % wastage : 8 kg
c. Welding electrodes :
Welding electrodes for stitch welding at 10 % of total with 2.5 % wastage : 120 Nos
Welding electrodes for run welding at 90 % of total with 2.5 % wastage : 1075 Nos

17
GATES AND HOISTS

2. Cutting :
Length of cutting assuming cutting for 2 sides : 57 Rm
Add for variations ( cutting for more than 2 sides / odd shapes etc ) at 10 % : 6 Rm
Total : 63 Rm
For cutting structural steel sections to required sizes gas cutting is assumed.
Length of steel to be cut by using gas manually : 40 m
Length of steel to be cut by gas using pug cutting machine : 23 m
Time for gas cutting manually assuming average cutting progress of 2 m / hour : 20 hours
Time for gas cutting by pug cutting machine at ( av ) 3 m / hour : 8 hours
Acetelyne gas @ 0.6 cum / hour ( 28 x 0.60 ) : 17 cum
Oxygen gas @ 1.8 cum / hour ( 28 x 1.80 ) : 51 cum
Use of gas cutting torch with 50 min / hr working ( 20 x 60 / 50 ) : 24 hours
Use of pug cutting machine with 50 min / hr working ( 8 x 60 / 50 ) : 10 hours
3. Welding :
Length of welding : 151 Rm
For stich welding @ 2 hrs usage / shift & @ 15 electrodes / hr
( 120 / 15 ) x 8 / 2 : 32 hours
For run welding @ 6 hrs usage / shift & @ 15 electrodes / hr
( 1075 / 15 ) x 8 / 6 : 96 hours
Total : 128 hours
Deploy welding transformer for 128 hours.
Fuel / Energy charges @ 25 % hrs for stitch welding & @ 75 % hrs for run welding.
( 32 x 0.25 + 96 x 0.75 ) : 80 hours
4. Surface cleaning and painting :
Painting area for catwalk at 25 sqm / tonne : 132 sqm
1 coat of zinc rich epoxy primer 40 micron dry film each coat.
Quantity of primer paint for 132 sqm @ 9 sqm / ltr / coat : 15 ltr
2 coats of coal tar epoxy paint 100 micron dry film each coat.
Quantity of coal tar epoxy paint for 132 sqm @ 6 sqm / ltr / coat : 44 ltr
As surface cleaning by sand blasting is hazardous, it is proposed to adopt chemical treatment
to remove grease, rust, scaling etc., and to form phasphate coating to prevent further rusting
before applying primer painting.
Quantity of rust cleaner / inhibitor at 8 sqm / ltr : 16 ltr
5. Requirement of other machinery :
For erection of fabricated catwalk 1 hour use of tower crane considered.
For handling during fabrication mobile derric crane for 4 hours considered.
For drilling holes for bolts 2 hours use of drilling machine considered.
For grinding and finishing weld joints 2 hours use of grinding machine considered
6. Requirement of work force :
Work component Foreman Marker / Gas cutter / Helper
Fabricator / Welder
Erector
Cutting sections / drilling holes 34 hours 2 4 4 8
Fabricating by stitch welding 32 hours 2 4 --- 16
Run welding 96 hours 1 --- 12 12
Erection / anchoring / finishing / checking 1 2 --- 2
Total : 6 10 16 38
Note : It is assumed that all stitch welding will be done by fabricator. Hence, no separate provision is
considered for welder for stitch welding.
For surface cleaning by chemical cleaner
and wire brushing at 15 sqm / day : 9 helpers for 132 sqm
For painting 1 coat primer and 2 coats
finishing paint at 15 sqm / day : 26 painter Cl-ll & 7 helpers for 3 x 132 sqm

18
GATES AND HOISTS

7. Excise duty on supply :


Excise duty is applicable on supply of fabricated parts. The cost of materials is inclusive of all
taxes/ duties. Therefore, for purpose of rate analysis 75 percent of total cost excluding the cost
of materials ( assuming 25 % erection cost ) is considered for assessing excise duty.
8. Use rate of materials :
Cost of welding set @ Rs: 3375.00 / Each Rs: 3375.00
Life of welding set : 1000 hours
Use rate of welding set per hour ( cost / life ) Rs: 3.38
Cost of gas cutting set @ Rs: 1125.00 / Each Rs: 1125
Life of gas cutting set : 600 hours
Use rate of gas cutting set per hr ( cost / life ) Rs: 1.88

RATE ANALYSIS UNIT : 18.000 Rm


A. MATERIALS:
Sl No Perticulars Unit Quantity Rate Amount
in Rs. in Rs.
1 Structural steel
Angles / beams / channels / bars kg 4258.00 20.00 85160.00
Plates / flats kg 98.00 24.00 2352.00
Chequered plates kg 856.00 25.20 21571.20
2 Bolt / Nut / Washer
MS bolts / nuts / washers kg 8.00 45.00 360.00
3 Oxygen gas cum 51.00 40.00 2040.00
4 Acetyline gas cum 17.00 185.00 3145.00
5 Welding electrodes Nos 1195.00 4.00 4780.00
6 Zinc rich epoxy primer ltr 15.00 525.00 7875.00
7 Coal tar epoxy paint ltr 44.00 131.00 5764.00
8 Rust cleaner / inhibitor ltr 16.00 175.00 2800.00
9 Use rate welding holder set Hour 128.00 3.38 432.00
10 Use rate gas cutting torch set Hour 24.00 1.88 45.00
11 Wire brush Nos 1.00 25.00 25.00
12 Sundries LS 10.00 22.50 225.00
TOTAL Rs: 136574.20
Add for small Tools and Plants @ 1% Rs: 1365.74
Add for Contractor' Profit @ 10% Rs: 13657.42
Add for Contrators' Overheads @ 5% Rs: 6828.71
Total cost of Materials Rs: 158426.07

B. MACHINERY:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Welding transformer Hour 128.00 9.00 1152.00
Fuel / Energy charges Hour 80.00 49.00 3920.00
2 Tower crane Hour 1.00 763.00 763.00
Fuel / Energy charges Hour 1.00 106.00 106.00
3 Pug cutting machine Hour 10.00 13.00 130.00
Fuel / Energy charges Hour 10.00 2.00 20.00
4 Mobile derric crane Hour 4.00 261.00 1044.00
Fuel / Energy charges Hour 4.00 117.00 468.00
5 Grinding machine Hour 2.00 15.00 30.00
Fuel / Energy charges Hour 2.00 20.00 40.00
6 Drilling machines Hour 2.00 15.00 30.00
Fuel / Energy charges Hour 2.00 20.00 40.00
7 Sundries LS 10.00 22.50 225.00
TOTAL Rs: 7968.00
Add for small Tools and Plants @ 1% Rs: 79.68

19
GATES AND HOISTS

Add for Contractor' Profit on DPOL / Energy @ 10% Rs: 481.90


Add for Contrators' Overheads @ 5% Rs: 398.40
Total hire charges of Machinery Rs: 8927.98

C. LABOUR:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Crew for Mobile crane Hour 4.00 32.90 131.60
2 Crew for Tower crane Hour 1.00 36.05 36.05
3 Crew for Drilling machine Hour 2.00 35.00 70.00
4 Crew for Grinding machine Hour 2.00 35.00 70.00
5 Foreman Day 6.00 108.65 651.90
6 Marker / Fabricator / Erector Day 10.00 93.70 937.00
7 Gas cutter Day 4.00 93.70 374.80
8 Welder ( General ) Day 12.00 93.70 1124.40
9 Helper fabrication / erection Day 38.00 81.60 3100.80
10 Helper for cleaning / painting Day 16.00 81.60 1305.60
11 Painter Cl - II Day 26.00 81.60 2121.60
12 Electrician Day 1.00 82.65 82.65
TOTAL Rs: 10006.40
Add for small Tools and Plants @ 1% Rs: 100.06
Add for Contractor' Profit @ 10% Rs: 1000.64
Add for hidden cost on Labour @ 15% Rs: 1500.96
Add for additional hidden cost on labour @ 15% Rs: 1500.96
Add for Contrators' Overheads @ 5% Rs: 500.32
Total cost of Labour Rs: 14609.34

ABSTRACT:
A. Cost of Materials Rs: 158426.07
B. Hire charges of Machinery Rs: 8927.98
C. Cost of Labour Rs: 14609.34
Total Rs: 181963.40
Add for excise duty on 75 percent cost
excluding cost of materials @ 18.00% Rs: 3177.54
Add for insurance charges @ 1.00% Rs: 1819.63
Add for designs and drawings @ 2.5% Rs: 4549.08
Add for zigs / supports / winches / chain-pulley @ 2.5% Rs: 4549.08
Add for power supply arrangements @ 2.5% Rs: 4549.08
Add for enabling works @ 2% Rs: 3639.27
Total Rs: 204247.09
Add for 2 rehandling leads for 1 km including loading and unloading :
Fabricated parts 2x5.318 tonnes @ Rs: 81.30 / tonne Rs: 864.71
Add for transportation upto work site @ 3% Rs: 6127.41
Total cost for 18.000 Rm Rs: 211239.21
Rate per Rm Rs: 11740.00

SECTION: GATE / HOIST & ALLIED WORKS. YEAR: 2003-2004 ITEM No: 5

ITEM: Design, fabrication, supply, erection and commissioning of embedded parts consisting of
sill beam, slide tracks, seal seats, guide rails, dogging sets for storage of stoplog elements
etc., with all accessories for spillway stop log gate elements including cost of all materials,
machinery, labour, cutting, welding, aligning, anchoring, finishing, cleaning, applying one coat
of zinc rich epoxy primer and four coats of cold applied coal tar epoxy paint etc., complete as
per specifications and approved drawings with all leads and lifts.

DATA: Spillway stoplog gate embedded parts consist of sill beam, slide tracks / seal tracks and gate

20
GATES AND HOISTS

guides and dogging sets for storage of elements with accessories such as first stage anchors.
Consider embedded parts for stoplog gate for spillway opening of size 15 m x 9 m for analysis.
Details of material / Gas cutting / Welding considered for rate analysis are based on embedded
parts drawings for spillway stop log gate of Kodasalli dam with sill level 0.4 m below crest.
Weight of stoplog gate elements in tonne for 15 m x 9 m opening based on empirical formula :
Length of gate in m : Clear opening + 0.65 m : 15.00 + 0.65 : 15.65 m
Height of gate ( total height of gate elements ) in m : FRL - Sill level + 0.2 : 9.60 m
Head of water in m : FRL - Sill level : 9.40 m
Weight of all gate elements in tonnes = 0.0553 x ( L^2 x H x h )^0.716
Where ( L ) is length and ( H ) is height and ( h ) is head of water in metres.
Weight of embedded parts with dogging sets will be about 4 to 5 percent of stop log gate weight.
Weight of embedded parts for stoplog gate = 0.0025 x ( L^2 x H x h )^0.716
= 0.0025 x ( 15.65^2 x 9.6 x 9.4 )^0.716: 3.225
The actual weight of embedded parts as per data sheet : 3.179 tonnes
Consider actual weight for data rate analysis.
1. Requirement of materials : as per fabrication drawings ( for details refer Item : 5 of Annexer )
a. Structural steel conforming to IS : 2062 :
Structural steel angles / beams / channels / bars with 2.5 % wastage : 432 kg
Structural steel plates / flats with 2.5 % wastage : 2301 kg
b. Alloy steel conforming to IS : 1570 :
Stainless steel plates / flats : 411.00 kg
c. Bolt / Nut / Washer conforming to IS : 1363 :
MS bolts and nuts with 2.5 % wastage : 115 kg
d. Welding electrodes :
Welding electrodes for stitch welding at 10 % of total with 2.5 % wastage : 166 Nos
Welding electrodes (SS) for stitch welding at 10 % of total with 2.5 % wastage : 103 Nos
Welding electrodes ( LH ) for run welding at 90 % of total with 2.5 % wastage : 1499 Nos
Welding electrodes ( SS ) for run welding at 90 % of total with 2.5 % wastage : 927 Nos
2. Cutting :
Length of cutting assuming cutting for 2 sides as per data sheet : 163 Rm
Add for variations ( cutting for more than 2 sides / odd shapes etc ) at 10 % : 17 Rm
Total length of cutting : 180 Rm
For cutting structural steel sections to required size gas cutting is assumed for cutting angles /
beams / channels / round bars. For plates / flats less than 12 mm in thickness plate shearing
machine and for the remaining sections pug cutting machine is considered.
Length of steel to be cut by using gas manually : 30 m
Length of steel to be cut by gas using pug cutting machine : 120 m
Length of steel to be cut by using shearing machine : 30 m
Time for gas cutting manually assuming average cutting progress of 2 m / hour : 15 hours
Time for gas cutting by pug cutting machine at ( av ) 3 m / hour : 40 hours
Time for cutting by shearing machine at av. 10 m / hr progress : 3 hours
Acetelyne gas @ 0.6 cum / hour ( 55 x 0.60 ) : 33 cum
Oxygen gas @ 1.8 cum / hour ( 55 x 1.80 ) : 99 cum
Use of gas cutting torch with 50 min / hr working ( 15 x 60 / 50 ) : 18 hours
Use of pug cutting machine with 50 min / hr working ( 40 x 60 / 50 ) : 48 hours
Use of shearing machine with 50 min / hr working ( 3 x60 / 50 ) : 4 hours
3. Welding :
Length of welding as per data sheet : 303 m
For stich welding @ 2 hrs usage / shift & @ 15 electrodes / hr
( 166 + 103 ) x 8 / 15 / 2 : 72 hours
For run welding @ 6 hrs usage / shift & @ 15 electrodes / hr
( 1499 + 927 ) x 8 / 15 / 6 : 216 hours
Total : 288 hours

21
GATES AND HOISTS

Deploy welding transformer for 288 hours.


Fuel / Energy charges @ 25 % hrs for stitch welding & @ 75 % hrs for run welding.
( 72 x 0.25 + 216 x 0.75 ) : 180 hours
4. Planing SS plates for slide block / seal tracks :
For surface finishing of SS plates for wheel / seal tracks planing machine is considered.
Length of SS plate for surface finishing by planing machine 50.4 Rm
Length of planing at a time for 4 m stroke planing machine 3 Rm
Time for planing 3 m length section with 50 min / hour working 8 hours
Time for planing 50.4 m SS plates ( 50.4 x 8 / 3 ) 135 hours
5. Surface cleaning and painting :
Painting area for embedded parts at 7 sqm / tonne : 22 sqm
1 coat of zinc rich epoxy primer 40 micron dry film each coat.
Quantity of primer paint for 22 sqm @ 9 sqm / ltr / coat : 2.5 ltr
4 coats of coal tar epoxy paint 100 micron dry film each coat.
Quantity of coal tar epoxy paint for 22 sqm @ 6 sqm / ltr / coat : 15 ltr
As surface cleaning by sand blasting is hazardous, it is proposed to adopt chemical treatment
to remove grease, rust, scaling etc., and to form phasphate coating to prevent further rusting
before applying primer painting.
Quantity of rust cleaner / inhibitor at 8 sqm / ltr : 3 ltr
6. Requirement of other machinery :
For drilling holes for anchor bolts and for grinding surface / edges of parts requiring finishing
16 hours use of drilling / grinding machine considered.
For handling and erection mobile derric crane for 4 hours and stationery derric crane for 8 hrs
considered.
7. Requirement of work force :
Work component Foreman Marker / Gas cutter / Helper
Fabricator / Welder
Erector
Cutting sections 70 hours 4 8 8 16
Drilling holes for anchors / supports 1 2 --- 2
Fabricating by stitch welding 72 hours 4 9 --- 18
Run welding 216 hours 3 --- 27 27
Erection of anchors / dogging set --- 12 --- 12
Erection of Sill beam / Tracks / Guide 3 3 --- 6
Finishing / cleaning / checking 1 1 --- 2
Total : 16 35 35 83
Note : It is assumed that all stitch welding will be done by fabricator. Hence, no separate provision is
considered for welder for stitch welding.
For surface cleaning by chemical cleaner
and wire brushing at 15 sqm / day : 2 helper for 20 sqm
For painting 1 coat primer and 4 coats
finishing paint at 15 sqm / day : 7 painter Cl-ll & 1 helper for 5 x 20 sqm
8. Excise duty on supply :
Excise duty is applicable on supply of fabricated parts. The cost of materials is inclusive of all
taxes/ duties. Therefore, for purpose of rate analysis 75 percent of total cost excluding the cost
of materials ( assuming 25 % erection cost ) is considered for assessing excise duty.
9. Use rate of materials :
Cost of welding set @ Rs: 3375.00 / Each Rs: 3375.00
Life of welding set : 1000 hours
Use rate of welding set per hour ( cost / life ) Rs: 3.38
Cost of gas cutting set @ Rs: 1125.00 / Each Rs: 1125
Life of gas cutting set : 600 hours
Use rate of gas cutting set per hr ( cost / life ) Rs: 1.88

22
GATES AND HOISTS

RATE ANALYSIS UNIT : 3.179 tonne


A. MATERIALS:
Sl No Perticulars Unit Quantity Rate Amount
in Rs. in Rs.
1 Str steel angle / beam / channel / bars kg 432.00 20.00 8640.00
2 Structural steel plate / flats kg 2301.00 24.00 55224.00
3 Stainless steel plate / flats kg 411.00 90.00 36990.00
4 MS bolts and nuts kg 115.00 45.00 5175.00
5 Oxygen gas cum 99.00 40.00 3960.00
6 Acetyline gas cum 33.00 185.00 6105.00
7 Welding electrodes Nos 166.00 4.00 664.00
8 Welding electrodes ( LH ) Nos 1499.00 6.00 8994.00
9 Welding electrodes ( stainless steel ) Nos 1030.00 35.00 36050.00
10 Zinc rich epoxy primer ltr 2.50 525.00 1312.50
11 Coal tar epoxy paint ltr 15.00 131.00 1965.00
12 Rust cleaner / inhibitor ltr 3.00 175.00 525.00
13 Use rate welding holder set Hour 288.00 3.38 972.00
14 Use rate gas cutting torch set Hour 18.00 1.88 33.75
15 Wire brush Nos 1.00 25.00 25.00
16 Sundries LS 20.00 22.50 450.00
TOTAL Rs: 167085.25
Add for small Tools and Plants @ 1% Rs: 1670.85
Add for Contractor' Profit @ 10% Rs: 16708.53
Add for Contrators' Overheads @ 5% Rs: 8354.26
Total cost of Materials Rs: 193818.89

B. MACHINERY:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Welding transformer Hour 288.00 9.00 2592.00
Fuel / Energy charges Hour 180.00 49.00 8820.00
2 Plate shearing machine Hour 4.00 47.00 188.00
Fuel / Energy charges Hour 4.00 82.00 328.00
3 Pug cutting machine Hour 48.00 13.00 624.00
Fuel / Energy charges Hour 48.00 2.00 96.00
4 Planing machine Hour 135.00 66.00 8910.00
Fuel / Energy charges Hour 135.00 61.00 8235.00
5 Mobile derric crane Hour 4.00 261.00 1044.00
Fuel / Energy charges Hour 4.00 117.00 468.00
6 Stationery derric crane Hour 8.00 50.00 400.00
Fuel / Energy charges Hour 8.00 5.00 40.00
7 Grinding machine Hour 16.00 15.00 240.00
Fuel / Energy charges Hour 16.00 20.00 320.00
8 Drilling machines Hour 16.00 15.00 240.00
Fuel / Energy charges Hour 16.00 20.00 320.00
9 Sundries LS 20.00 22.50 450.00
TOTAL Rs: 33315.00
Add for small Tools and Plants @ 1% Rs: 333.15
Add for Contractor' Profit on DPOL / Energy @ 10% Rs: 1907.70
Add for Contrators' Overheads @ 5% Rs: 1665.75
Total hire charges of Machinery Rs: 37221.60

23
GATES AND HOISTS

C. LABOUR:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Crew for Mobile crane Hour 4.00 32.90 131.60
2 Crew for Planing machine Hour 135.00 42.75 5771.25
3 Crew for Drilling machine Hour 16.00 35.00 560.00
4 Crew for Grinding machine Hour 16.00 35.00 560.00
5 Foreman Day 16.00 108.65 1738.40
6 Marker / Fabricator / Erector Day 35.00 93.70 3279.50
7 Gas cutter Day 8.00 93.70 749.60
8 Welder ( General ) Day 24.00 93.70 2248.80
9 Welder ( X - ray ) Day 3.00 103.07 309.21
10 Helper fabrication / erection Day 83.00 81.60 6772.80
11 Helper for cleaning / painting Day 3.00 81.60 244.80
12 Painter Cl - II Day 7.00 81.60 571.20
13 Electrician Day 2.00 82.65 165.30
TOTAL Rs: 23102.46
Add for small Tools and Plants @ 1% Rs: 231.02
Add for Contractor' Profit @ 10% Rs: 2310.25
Add for hidden cost on Labour @ 15% Rs: 3465.37
Add for additional hidden cost on labour @ 15% Rs: 3465.37
Add for Contrators' Overheads @ 5% Rs: 1155.12
Total cost of Labour Rs: 33729.59

ABSTRACT:
A. Cost of Materials Rs: 193818.89
B. Hire charges of Machinery Rs: 37221.60
C. Cost of Labour Rs: 33729.59
Total Rs: 264770.08
Add for excise duty on 75 percent cost
excluding cost of materials @ 18.00% Rs: 9578.41
Add for insurance charges @ 1.00% Rs: 2647.70
Add for designs and drawings @ 2.5% Rs: 6619.25
Add for zigs / supports / winches / chain-pulley @ 2.5% Rs: 6619.25
Add for power supply arrangements @ 2.5% Rs: 6619.25
Add for enabling works @ 2% Rs: 5295.40
Total Rs: 302149.35
Add for 2 rehandling leads for 1 km including loading and unloading :
Fabricated parts 2x3.179 tonnes @ Rs: 81.30 / tonne Rs: 516.91
Add for transportation upto work site @ 3% Rs: 9064.48
Total cost for 3.179 tonne Rs: 311730.74
Rate per tonne Rs: 98060.00

SECTION: GATE / HOIST & ALLIED WORKS. YEAR: 2003-2004 ITEM No: 6

ITEM: Design, fabrication, supply, erection, testing and commissioning of vertical lift sliding type all
interchangeable ( except bottom element ) stoplog gate elements consisting of skin plate,
horizontal and vertical girders, stiffeners, lifting pins, bronze padded slide blocks, guide shoes,
rubber seals, clamps etc., with all accessories for spillway including cost of all materials,
machinery, labour, cutting, aligning, welding, finishing, cleaning, applying one coat of zinc
rich epoxy primer and three coats of cold applied coal tar epoxy paint, seal fixing etc.,
complete as per specifications and approved drawings with all leads and lifts.

DATA: Spillway stoplog gate consists of number of vertical lift slide gate elements. Each gate element
consists of skin plate, horizontal girders, vertical end girders, stiffeners, slide blocks, gate guide
shoes, lifting pins and seals with all accessories.

24
GATES AND HOISTS

Consider spillway stoplog elements for 15 m x 9 m spillway opening for analysis.


Details of material / Gas cutting / Welding considered for rate analysis are based on spillway
stop log gate drawings for 15 m x 9 m spillway opening of Kodasalli dam with sill level 0.4 m
below the spillway crest.
Weight of stoplog gate elements in tonne for 15 m x 9 m opening based on empirical formula :
Length of gate in m : Clear opening + 0.65 m : 15.00 + 0.65 : 15.65 m
Height of gate ( total height of gate elements ) in m : FRL - Sill level + 0.2 : 9.60 m
Head of water in m : FRL - Sill level : 9.40 m
Weight of all gate elements in tonnes = 0.0553 x ( L^2 x H x h )^0.716
Where ( L ) is length and ( H ) is height and ( h ) is head of water in metres.
= 0.0553 x ( 15.65 x 15.65 x 9.6 x 9.4 ) ^ 0.716 : 71.340
The actual weight of spillway stoplog elements as per data sheet : 71.157 tonnes
Consider actual weight for data rate analysis.
1. Requirement of materials : as per fabrication drawings ( for details refer Item : 6 of Annexer )
a. Structural steel conforming to IS : 2062 :
Structural steel angles / beams / channels / bars with 2.5 % wastage : 473 kg
Structural steel plates / flats with 2.5 % wastage : 71963 kg
b. Alloy steel components conforming to IS : 1570 :
Lifting pins : 104 kg
c. Alluminium / Bronze alloy components conforming to IS : 305 :
Bronze pads for slide blocks : 48 kg
d. Bolts / Nuts / Washers conforming to IS : 1363 :
GI bolts / nuts / washers with 2.5 % wastage : 295 kg
MS bolts / nuts / washers with 2.5 % wastage : 49 kg
e. Rubber seal conforming to IS : 11855 :
Bottom seal : 123 Rm
Side seals ( music note type uncladed ) : 20 Rm
f. Welding electrodes :
Welding electrodes for stitch welding at 10 % of total with 2.5 % wastage : 2765 Nos
Welding electrodes ( LH ) for run welding at 90 % of total with 2.5 % wastage : 24885 Nos
2. Cutting :
Length of cutting assuming cutting for 2 sides : 980 Rm
Add for variations ( cutting for more than 2 sides / odd shapes etc ) at 10 % : 98 Rm
Total : 1078 Rm
For cutting structural steel sections to required sizes gas cutting is assumed since most of the
sections are above 10 mm thick.
Length of steel to be cut by using gas manually : 50 m
Length of steel to be cut by gas using pug cutting machine : 1028 m
Time for gas cutting manually assuming average cutting progress of 2 m / hour : 25 hours
Time for gas cutting by pug cutting machine at ( av ) 3 m / hour : 343 hours
Acetelyne gas @ 0.6 cum / hour ( 368 x 0.60 ) : 221 cum
Oxygen gas @ 1.8 cum / hour ( 368 x 1.80 ) : 663 cum
Use of gas cutting torch with 50 min / hr working ( 25 x 60 / 50 ) : 30 hours
Use of pug cutting machine with 50 min / hr working ( 343 x 60 / 50 ) : 412 hours
3. Welding :
Length of welding : 3228 Rm
For stich welding @ 2 hrs usage / shift & @ 15 electrodes / hr
( 2765 / 15 ) x 8 / 2 : 737 hours
For run welding @ 6 hrs usage / shift & @ 15 electrodes / hr
( 24885 / 15 ) x 8 / 6 : 2212 hours
Total : 2949 hours
Deploy welding transformer for 2949 hours.
Fuel / Energy charges @ 25 % hrs for stitch welding & @ 75 % hrs for run welding.
( 737 x 0.25 + 2212 x 0.75 ) : 1843 hours

25
GATES AND HOISTS

4. Surface cleaning and painting :


Painting area for stoplog gate elements at 18 sqm / tonne : 1280 sqm
1 coat of zinc rich epoxy primer 40 micron dry film each coat.
Quantity of primer paint for 1280 sqm @ 9 sqm / ltr / coat : 142 ltr
3 coats of coal tar epoxy paint 100 micron dry film each coat.
Quantity of coal tar epoxy paint for 1280 sqm @ 6 sqm / ltr / coat : 640 ltr
As surface cleaning by sand blasting is hazardous, it is proposed to adopt chemical treatment
to remove grease, rust, scaling etc., and to form phasphate coating to prevent further rusting
before applying primer painting.
Quantity of rust cleaner / inhibitor at 8 sqm / ltr : 160 ltr
5. Requirement of other machinery :
For handling during fabrication mobile derric crane for 50 hours and stationery derric crane for
100 hours considered.
For drilling holes in skin plate and seal clamps for seal fixing 100 hours use of drilling machine
considered.
For grinding and finishing weld joints in skin plate and other locations 50 hours use of grinding
machine considered.
6. Requirement of work force :
Work component Foreman Marker / Gas cutter / Helper
Fabricator / Welder
Erector
Cutting sections 442 hours 28 56 56 112
Drilling holes for seal fixing 6 12 --- 12
Fabricating by stitch welding 737 hours 46 92 --- 184
Run welding 2212 hours 28 --- 277 277
Seal fixing 8 elements @ 2 per day 4 4 --- 8
Finishing / cleaning / guide shoe fixing 1 2 --- 4
Trial operation and checking 2 2 --- 4
Total : 115 168 333 601
Note : It is assumed that all stitch welding will be done by fabricator. Hence, no separate provision is
considered for welder for stitch welding.
For surface cleaning by chemical cleaner
and wire brushing at 15 sqm / day : 85 helpers for 1280 sqm
For painting 1 coat primer and 3 coats
finishing paint at 15 sqm / day : 341 painter Cl-ll & 68 helpers for 4 x 1280 sqm
7. Excise duty on supply :
Excise duty is applicable on supply of fabricated parts. The cost of materials is inclusive of all
taxes/ duties. Therefore, for purpose of rate analysis 75 percent of total cost excluding the cost
of materials ( assuming 25 % erection cost ) is considered for assessing excise duty.
8. Use rate of materials :
Cost of welding set @ Rs: 3375.00 / Each Rs: 3375.00
Life of welding set : 1000 hours
Use rate of welding set per hour ( cost / life ) Rs: 3.38
Cost of gas cutting set @ Rs: 1125.00 / Each Rs: 1125
Life of gas cutting set : 600 hours
Use rate of gas cutting set per hr ( cost / life ) Rs: 1.88

RATE ANALYSIS UNIT : 71.157 tonne


A. MATERIALS:
Sl No Perticulars Unit Quantity Rate Amount
in Rs. in Rs.
1 Structural steel
Angles / beams / channels / bars kg 473.00 20.00 9460.00
Plates / flats kg 71963.00 24.00 1727112.00

26
GATES AND HOISTS

2 Alloy steel components


Lifting pins kg 104.00 175.00 18200.00
3 Alluminium / Bronze alloy components
Bronze pads kg 48.00 380.00 18240.00
4 Bolt / Nut / Washer
GI bolts / nuts / washers kg 295.00 60.00 17700.00
MS bolts / nuts / washers kg 49.00 45.00 2205.00
5 Rubber seals
Bottom seal Rm 123.00 120.00 14760.00
Side seals Rm 20.00 190.00 3800.00
6 Oxygen gas cum 663.00 40.00 26520.00
7 Acetyline gas cum 221.00 185.00 40885.00
8 Welding electrodes Nos 2765.00 4.00 11060.00
9 Welding electrodes ( LH ) Nos 24885.00 6.00 149310.00
10 Zinc rich epoxy primer ltr 142.00 525.00 74550.00
11 Coal tar epoxy paint ltr 640.00 131.00 83840.00
12 Rust cleaner / inhibitor ltr 160.00 175.00 28000.00
13 Use rate welding holder set Hour 2949.00 3.38 9952.88
14 Use rate gas cutting torch set Hour 30.00 1.88 56.25
15 Wire brush Nos 13.00 25.00 325.00
16 Sundries LS 200.00 22.50 4500.00
TOTAL Rs: 2240476.13
Add for small Tools and Plants @ 1% Rs: 22404.76
Add for Contractor' Profit @ 10% Rs: 224047.61
Add for Contrators' Overheads @ 5% Rs: 112023.81
Total cost of Materials Rs: 2598952.31

B. MACHINERY:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Welding transformer Hour 2949.00 9.00 26541.00
Fuel / Energy charges Hour 1843.00 49.00 90307.00
2 Pug cutting machine Hour 412.00 13.00 5356.00
Fuel / Energy charges Hour 412.00 2.00 824.00
3 Mobile derric crane Hour 50.00 261.00 13050.00
Fuel / Energy charges Hour 50.00 117.00 5850.00
4 Stationery derric crane Hour 100.00 50.00 5000.00
Fuel / Energy charges Hour 100.00 5.00 500.00
5 Grinding machine Hour 50.00 15.00 750.00
Fuel / Energy charges Hour 50.00 20.00 1000.00
6 Drilling machines Hour 100.00 15.00 1500.00
Fuel / Energy charges Hour 100.00 20.00 2000.00
7 Sundries LS 100.00 22.50 2250.00
TOTAL Rs: 154928.00
Add for small Tools and Plants @ 1% Rs: 1549.28
Add for Contractor' Profit on DPOL / Energy @ 10% Rs: 10273.10
Add for Contrators' Overheads @ 5% Rs: 7746.40
Total hire charges of Machinery Rs: 174496.78

C. LABOUR:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Crew for Mobile crane Hour 50.00 5541.15 277057.50
2 Crew for Drilling machine Hour 100.00 35.00 3500.00
3 Crew for Grinding machine Hour 50.00 35.00 1750.00
4 Foreman Day 115.00 108.65 12494.75

27
GATES AND HOISTS

5 Marker / Fabricator / Erector Day 168.00 93.70 15741.60


6 Gas cutter Day 56.00 93.70 5247.20
7 Welder ( General ) Day 250.00 93.70 23425.00
8 Welder ( X - ray ) Day 27.00 103.07 2782.89
9 Khalasi Day 50.00 83.65 4182.50
10 Helper fabrication / erection Day 601.00 81.60 49041.60
11 Helper cleaning / painting Day 153.00 81.60 12484.80
12 Painter Cl - II Day 341.00 81.60 27825.60
13 Electrician Day 5.00 82.65 413.25
TOTAL Rs: 435946.69
Add for small Tools and Plants @ 1% Rs: 4359.47
Add for Contractor' Profit @ 10% Rs: 43594.67
Add for hidden cost on Labour @ 15% Rs: 65392.00
Add for additional hidden cost on labour @ 15% Rs: 65392.00
Add for Contrators' Overheads @ 5% Rs: 21797.33
Total cost of Labour Rs: 636482.17

ABSTRACT:
A. Cost of Materials Rs: 2598952.31
B. Hire charges of Machinery Rs: 174496.78
C. Cost of Labour Rs: 636482.17
Total Rs: 3409931.25
Add for excise duty on 75 percent cost
excluding cost of materials @ 18.00% Rs: 109482.16
Add for insurance charges @ 1.00% Rs: 34099.31
Add for designs and drawings @ 2.5% Rs: 85248.28
Add for zigs / supports / winches / chain-pulley @ 2.5% Rs: 85248.28
Add for power supply arrangements @ 2.5% Rs: 85248.28
Add for enabling works @ 2% Rs: 68198.63
Total Rs: 3877456.19
Add for 2 rehandling leads for 1 km including loading and unloading :
Fabricated parts 2x71.157 tonnes @ Rs: 81.30 / tonne Rs: 11570.13
Add for transportation upto work site @ 3% Rs: 116323.69
Total cost for 71.157 tonne Rs: 4005350.01
Rate per tonne Rs: 56290.00

SECTION: GATE / HOIST & ALLIED WORKS. YEAR: 2003-2004 ITEM No: 7

ITEM: Design, fabrication, supply, erection, testing and commissioning of automatic lifting beam
with all accessories for handling, lowering and lifting of spillway stop log gate elements
including cost of all materials, machinery, labour, cutting, aligning, welding, finishing, cleaning,
applying one coat of zinc rich epoxy primer and two coats of cold applied coal tar epoxy paint
etc., complete as per specifications and drawings with all leads and lifts.

DATA: Automatic lifting beam for lifting spillway stop log elements consists of fabricated beam with
lifting bracket and automatic engaging / dis-engaging type hooks for under water hooking /
de-hooking of gate element. Lifting beam is an independent attachment to moving gantry crane.
Consider spillway stoplog gate for spillway opening of size 15 m x 9 m for analysis.
Details of material / Gas cutting / Welding considered for rate analysis are based on spillway
stop log gate lifting beam drawings for 15 m x 9 m spillway opening of Kodasalli dam.
Generally the weight of lifting beam for spillway stoplog element will be about 40 percent of the
weight of one stoplog element. Generally each stoplog element will be 1 to 1.2 m height.
For 9.6 m height of stoplog gate the number of elements of 1.2 m each will be 8.

28
GATES AND HOISTS

Weight of lifting beam in tonnes based on empirical formula :


Weight of lifting beam in tonnes = 0.02212 x ( L^2 x H x h )^0.716 / n
Where ( L ) is length and ( H ) is total height and ( h ) is head of water in metres and ( n ) is the
number of stoplog gate elements.
= 0.02212 x ( 15.65 x 15.65 x 9.6 x 9.4 ) ^ 0.716 / 8 : 3.567
The actual weight of stoplog element lifting beam as per data sheet : 3.528 tonnes
Consider actual weight for data rate analysis.
1. Requirement of materials : as per fabrication drawings ( for details refer Item : 7 of Annexer )
a. Structural steel conforming to IS : 2062 :
Structural steel angles / beams / channels / bars with 2.5 % wastage : 13 kg
Structural steel plates / flats with 2.5 % wastage : 3389 kg
b. Alloy steel components conforming to IS : 1570 :
Lifting pins : 101 kg
c. Alluminium / Bronze alloy components conforming to IS : 305 :
Bronze Bush : 5 kg
d. Forged steel components conforming to IS : 2004 :
Lifting hooks : 130 kg
e. Bolts / Nuts / Washers conforming to IS : 1363 :
MS bolts / nuts / washers with 2.5 % wastage : 3 kg
MS pipe 100 mm dia : 11 kg
f. Welding electrodes :
Welding electrodes for stitch welding at 10 % of total with 2.5 % wastage : 175 Nos
Welding electrodes ( LH ) for run welding at 90 % of total with 2.5 % wastage : 1575 Nos
2. Cutting :
Length of cutting assuming cutting for 2 sides : 172 Rm
Add for variations ( cutting for more than 2 sides / odd shapes etc ) at 10 % : 17 Rm
Total : 189 Rm
For cutting structural steel sections to required sizes gas cutting is assumed.
Length of steel to be cut by using gas manually : 40 m
Length of steel to be cut by gas using pug cutting machine : 149 m
Time for gas cutting manually assuming average cutting progress of 2 m / hour : 20 hours
Time for gas cutting by pug cutting machine at ( av ) 3 m / hour : 50 hours
Acetelyne gas @ 0.6 cum / hour ( 70 x 0.60 ) : 42 cum
Oxygen gas @ 1.8 cum / hour ( 70 x 1.80 ) : 126 cum
Use of gas cutting torch with 50 min / hr working ( 20 x 60 / 50 ) : 24 hours
Use of pug cutting machine with 50 min / hr working ( 50 x 60 / 50 ) : 60 hours
3. Welding :
Length of welding : 211 Rm
For stich welding @ 2 hrs usage / shift & @ 15 electrodes / hr
( 175 / 15 ) x 8 / 2 : 47 hours
For run welding @ 6 hrs usage / shift & @ 15 electrodes / hr
( 1575 / 15 ) x 8 / 6 : 140 hours
Total : 187 hours
Deploy welding transformer for 187 hours.
Fuel / Energy charges @ 25 % hrs for stitch welding & @ 75 % hrs for run welding.
( 47 x 0.25 + 140 x 0.75 ) : 117 hours
4. Surface cleaning and painting :
Painting area for lifting beam at 12 sqm / tonne : 42 sqm
1 coat of zinc rich epoxy primer 40 micron dry film each coat.
Quantity of primer paint for 42 sqm @ 9 sqm / ltr / coat : 5 ltr
2 coats of coal tar epoxy paint 100 micron dry film each coat.
Quantity of coal tar epoxy paint for 42 sqm @ 6 sqm / ltr / coat : 14 ltr
As surface cleaning by sand blasting is hazardous, it is proposed to adopt chemical treatment
to remove grease, rust, scaling etc., and to form phasphate coating to prevent further rusting
before applying primer painting.

29
GATES AND HOISTS

Quantity of rust cleaner / inhibitor at 8 sqm / ltr : 5 ltr


5. Requirement of other machinery :
For handling during fabrication mobile derric crane for 4 hours and stationery derric crane for
8 hours considered.
For drilling holes for pins / guide shoes 2 hours use of drilling machine considered.
For grinding and finishing weld joints 2 hours use of grinding machine considered.
6. Requirement of work force :
Work component Foreman Marker / Gas cutter / Helper
Fabricator / Welder
Erector
Cutting sections 84 hours 5 10 10 20
Drilling holes for pins / bolts fixing 1 --- 1
Fabricating by stitch welding 47 hours 3 6 --- 12
Run welding 140 hours 2 --- 18 18
Finishing / guide shoe fixing / checking 1 --- 1
Total : 10 18 28 52
Note : It is assumed that all stitch welding will be done by fabricator. Hence, no separate provision is
considered for welder for stitch welding.
For surface cleaning by chemical cleaner
and wire brushing at 15 sqm / day : 3 helpers for 42 sqm
For painting 1 coats primer and 2 coats
finishing paint at 15 sqm / day : 8 painter Cl-ll & 2 helpers for 3x42 sqm
7. Excise duty on supply :
Excise duty is applicable on supply of fabricated parts. The cost of materials is inclusive of all
taxes/ duties. Therefore, for purpose of rate analysis 75 percent of total cost excluding the cost
of materials ( assuming 25 % erection cost ) is considered for assessing excise duty.
8. Use rate of materials :
Cost of welding set @ Rs: 3375.00 / Each Rs: 3375.00
Life of welding set : 1000 hours
Use rate of welding set per hour ( cost / life ) Rs: 3.38
Cost of gas cutting set @ Rs: 1125.00 / Each Rs: 1125
Life of gas cutting set : 600 hours
Use rate of gas cutting set per hr ( cost / life ) Rs: 1.88

RATE ANALYSIS UNIT : 3.528 tonne


A. MATERIALS:
Sl No Perticulars Unit Quantity Rate Amount
in Rs. in Rs.
1 Structural steel
Angles / beams / channels / bars kg 13.00 20.00 260.00
Plates / flats kg 3389.00 24.00 81336.00
2 Alloy steel components
Lifting pins kg 101.00 175.00 17675.00
3 Bronze alloy components :
Bronze bush kg 5.00 380.00 1900.00
4 Forged steel components :
Lifting hooks kg 103.00 130.00 13390.00
5 MS pipe 100 mm dia kg 11.00 30.00 330.00
6 Bolt / Nut / Washer
MS bolts / nuts / washers kg 3.00 45.00 135.00
7 Oxygen gas cum 126.00 40.00 5040.00
8 Acetyline gas cum 42.00 185.00 7770.00
9 Welding electrodes Nos 175.00 4.00 700.00
10 Welding electrodes ( LH ) Nos 1575.00 6.00 9450.00
11 Zinc rich epoxy primer ltr 5.00 525.00 2625.00
12 Coal tar epoxy paint ltr 14.00 131.00 1834.00

30
GATES AND HOISTS

13 Rust cleaner / inhibitor ltr 5.00 175.00 875.00


14 Use rate welding holder set Hour 187.00 3.38 631.13
15 Use rate gas cutting torch set Hour 24.00 1.88 45.00
16 Wire brush Nos 1.00 25.00 25.00
17 Sundries LS 25.00 22.50 562.50
TOTAL Rs: 144583.63
Add for small Tools and Plants @ 1% Rs: 1445.84
Add for Contractor' Profit @ 10% Rs: 14458.36
Add for Contrators' Overheads @ 5% Rs: 7229.18
Total cost of Materials Rs: 167717.01

B. MACHINERY:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Welding transformer Hour 187.00 9.00 1683.00
Fuel / Energy charges Hour 117.00 49.00 5733.00
2 Pug cutting machine Hour 60.00 13.00 780.00
Fuel / Energy charges Hour 60.00 2.00 120.00
3 Mobile derric crane Hour 4.00 261.00 1044.00
Fuel / Energy charges Hour 4.00 117.00 468.00
4 Stationery derric crane Hour 8.00 50.00 400.00
Fuel / Energy charges Hour 8.00 5.00 40.00
5 Grinding machine Hour 2.00 15.00 30.00
Fuel / Energy charges Hour 2.00 20.00 40.00
6 Drilling machines Hour 2.00 15.00 30.00
Fuel / Energy charges Hour 2.00 20.00 40.00
7 Sundries LS 10.00 22.50 225.00
TOTAL Rs: 10633.00
Add for small Tools and Plants @ 1% Rs: 106.33
Add for Contractor' Profit on DPOL / Energy @ 10% Rs: 666.60
Add for Contrators' Overheads @ 5% Rs: 531.65
Total hire charges of Machinery Rs: 11937.58

C. LABOUR:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Crew for Mobile crane Hour 4.00 32.90 131.60
2 Crew for Drilling machine Hour 2.00 35.00 70.00
3 Crew for Grinding machine Hour 2.00 35.00 70.00
4 Foreman Day 10.00 108.65 1086.50
5 Marker / Fabricator / Erector Day 18.00 93.70 1686.60
6 Gas cutter Day 10.00 93.70 937.00
7 Welder ( General ) Day 18.00 93.70 1686.60
8 Helper fabrication / erection Day 52.00 81.60 4243.20
9 Helper for cleaning / painting Day 5.00 81.60 408.00
10 Painter Cl - II Day 8.00 81.60 652.80
11 Electrician Day 1.00 82.65 82.65
TOTAL Rs: 11054.95
Add for small Tools and Plants @ 1% Rs: 110.55
Add for Contractor' Profit @ 10% Rs: 1105.50
Add for hidden cost on Labour @ 15% Rs: 1658.24
Add for additional hidden cost on labour @ 15% Rs: 1658.24
Add for Contrators' Overheads @ 5% Rs: 552.75
Total cost of Labour Rs: 16140.23

31
GATES AND HOISTS

ABSTRACT:
A. Cost of Materials Rs: 167717.01
B. Hire charges of Machinery Rs: 11937.58
C. Cost of Labour Rs: 16140.23
Total Rs: 195794.81
Add for excise duty on 75 percent cost
excluding cost of materials @ 18.00% Rs: 3790.50
Add for insurance charges @ 1.00% Rs: 1957.95
Add for designs and drawings @ 2.5% Rs: 4894.87
Add for zigs / supports / winches / chain-pulley @ 2.5% Rs: 4894.87
Add for power supply arrangements @ 2.5% Rs: 4894.87
Add for enabling works @ 2% Rs: 3915.90
Total Rs: 220143.77
Add for 2 rehandling leads for 1 km including loading and unloading :
Fabricated parts 2x3.528 tonnes @ Rs: 81.30 / tonne Rs: 573.65
Add for transportation upto work site @ 3% Rs: 6604.31
Total cost for 3.528 tonne Rs: 227321.74
Rate per tonne Rs: 64430.00

SECTION: GATE / HOIST & ALLIED WORKS. YEAR: 2003-2004 ITEM No: 8

ITEM: Design, fabrication, supply, erection, testing and commissioning of adequate capacity Class- II
type moving gantry crane consisting of rail mounted gantry frame, top platform with hand
railing, long / cross travel arrangements, rope drums, gear systems, electric motors, electro-
magnetic brake system, cabin, control panel, wire rope, ladder, motorised cable reeling drum
etc., with all accessories for operating spillway stop log gate elements and river sluice /
canal sluice emergency gates including cost of all materials, machinery, labour, cutting,
bending, aligning, anchoring, welding, finishing, cleaning, applying two coats of zinc chromate
red oxide primer and three coats of approved synthetic enamel paint etc., complete with all
leads and lifts.

DATA: Moving gantry crane consists of rail mounted gantry frame with long travel arrangement, cross
travel trolley with track arrangement mounted on gantry frame top platform, rope drum hoist
with all accessories mounted on cross travel trolley for operating stoplog gate elements.
Consider moving gantry crane for operating spillway stoplog gate element of 8.92 t weight.
The same moving gantry crane can also be used for operating river sluice emergency gate.
Therefore, the hoisting capacity of the gantry crane depends on the requirement of hoisting
capacity for spillway stoplog element or river sluice emergency gate whichever is higher.
The capacity of moving gantry crane may be considered at 2.5 times wt of 1 stoplog element.
Details of material / Gas cutting / Welding considered for rate analysis are based moving gantry
crane drawings for spillway of Alamatti dam.
Total weight of stoplog elements as per item 6 : 71.34 tonnes
Number of elements : 8 Nos
Capacity of moving gantry crane in tonnes with 25% reserve capacity : 2.5 x ( W / n )
Where ( W ) is weight of 1 set of stoplog elements and ( n ) is number of stoplog elements.
Capacity of moving gantry crane required : 2.5 x ( 71.34 / 8 )
( capacity to be rounded off to next 5 tonne ) : 24.97 tonnes
say : 25 tonne
Actual capacity of moving gantry crane as per data considered : 25 tonne
Weight of moving gantry crane @ 1.25 t / tonne capacity ( 1.25 x 25 ) : 31.25 t
The actual weight of moving gantry crane as per data sheet : 30.856 t
Consider actual weight for data rate analysis.
1. Requirement of materials : as per fabrication drawings ( for details refer Item : 8 of Annexer )
a. Structural steel conforming to IS : 2062 :

32
GATES AND HOISTS

Angles / Beams / Channels / Bars with 2.5 % wastage : 1743.00 kg


Plates / Flats with 2.5 % wastage : 19700.00 kg
Chequered plate with 2.5 % wastage : 820 kg
b. Cast steel components conforming to IS : 1030 :
Rope drums 2 Nos / Gears : 2336.00 kg
Pinions : 149.00 kg
Wheels and Pulleys : 2255.00 kg
Plummer blocks / Couplings : 817.00 kg
c. Forged steel components conforming to IS : 2004 :
Hook / Shackle : 127.00 kg
d. Alloy steel steel components conforming to IS: 1570 :
Shafts : 556.00 kg
Pins 524.00 kg
e. Alluminium/ Bronze alloy components conforming to IS : 305 :
Bearings / Bush : 181.00 kg
f. Bolt / Nut / Washers conforming to IS : 1363 :
MS Bolts / Nuts / Washers with 2.5 % wastage : 63.00 kg
g. Steel wire rope conforming to IS : 2266 :
28 mm dia 6 / 37 construction 150 Rm @ 2.71 kg / m : 406 .00 kg
h. Other components :
Worm reducers : 4 Nos
Electric motor 17.5 hp : 1 No.
Electric motor 5 hp : 2 Nos
Electric motor 3 hp : 1 No.
Ele-magnetic / Thruster brakes : 4 No.
MS pipe 32 mm dia : 50 Rm
Electric cable / switches / control panels etc : 3 sets
I. Welding electrodes for stitch welding at 10 % of total with 2.5 % wastage : 1123 Nos
Welding electrodes ( LH ) for run welding at 90 % of total with 2.5 % wastage : 10110 Nos
2. Cutting :
Length of cutting assuming cutting for 2 sides : 761 Rm
Add for variations ( cutting for more than 2 sides / odd shapes etc ) at 10 % : 76 Rm
Total : 837 Rm
For cutting structural steel sections to required sizes gas cutting is assumed.
Length of steel to be cut by using gas cutting torch manually : 250 m
Length of steel to be cut by gas using pug cutting machine : 587 m
Time for gas cutting manually assuming average cutting progress of 2 m / hour : 125 hours
Time for gas cutting by pug cutting machine at ( av ) 3 m / hour : 196 hours
Acetelyne gas @ 0.6 cum / hour ( 321 x 0.60 ) : 193 cum
Oxygen gas @ 1.8 cum / hour ( 321 x 1.80 ) : 579 cum
Use of gas cutting torch with 50 min / hr working ( 125 x 60 / 50 ) : 150 hours
Use of pug cutting machine with 50 min / hr working ( 196 x 60 / 50 ) : 235 hours
3. Welding :
Length of welding : 1260 Rm
For stich welding @ 2 hrs usage / shift & @ 15 electrodes / hr
( 1123 / 15 ) x 8 / 2 : 300 hours
For run welding @ 6 hrs usage / shift & @ 15 electrodes / hr
( 10110 / 15 ) x 8 / 6 : 897 hours
Total : 1197 hours
Deploy welding transformer for 1197 hours.
Fuel / Energy charges @ 25 % hrs for stitch welding & @ 75 % hrs for run welding.
( 300 x 0.25 + 897 x 0.75 ) : 748 hours
4. Surface cleaning and painting :
Painting area for moving gantry crane at 25 sqm / t of str steel : 540 sqm
2 coats of zinc chromate red oxide primer.

33
GATES AND HOISTS

Quantity of primer paint for 540 sqm @ 12 sqm / ltr / coat : 90 ltr
3 coats of synthetic enamel paint.
Quantity of synthetic enamel paint for 540 sqm @ 12 sqm / ltr / coat : 135 ltr
As surface cleaning by sand blasting is hazardous, it is proposed to adopt chemical treatment
to remove grease, rust, scaling etc., and to form phasphate coating to prevent further rusting
before applying primer painting.
Quantity of rust cleaner / inhibitor at 8 sqm / ltr : 68 ltr
5. Requirement of other machinery :
For lifting and placing in position hoist drums, worm reducers, gears, floating shafts etc deploy
tower crane for 6 hours.
For handling and erection of portals mobile derric crane for 100 hours considered.
For drilling holes for bolts 16 hours use of drilling machine considered.
For grinding and finishing weld joints 32 hours use of grinding machine considered.
6. Requirement of work force :
Work component Foreman Marker / Gas cutter / Helper
Fabricator / Welder
Erector
Cutting sections 385 hours 24 48 48 96
Drilling holes for pins / bolts fixing 1 2 --- 2
Fabricating by stitch welding 300 hours 19 38 --- 76
Run welding 897 hours 11 --- 112 112
Assembly/Erection of wheels/ base frame 2 4 --- 8
Assembly/Erection of portals 2 4 --- 8
Assembly/Erection of top frame 2 4 --- 8
Assembly/Erection of CT trolley 2 4 --- 8
Assembly/Erection of drums / drive units 2 4 --- 8
Assembly/Erection of CT drive units 1 2 --- 4
Assembly/Erection of LT drive units 1 2 --- 4
Erection of cabin / railings etc 2 2 --- 4
Erection of control panel / cabling 1 1 --- 2
Checking and trial running without rope 2 4 --- 4
Rope fixing and checking 1 2 --- 2
Trial running by lifting / lowering gate 1 2 --- 2
Finishing / cleaning --- 1 --- 2
Total : 74 124 160 350
Note : It is assumed that all stitch welding will be done by fabricator. Hence, no separate provision is
considered for welder for stitch welding.
For surface cleaning by chemical cleaner
and wire brushing at 15 sqm / day : 36 helper for 540 sqm
For painting 2 coats primer and 3 coats
finishing paint at 20 sqm / day : 135 painter Cl-ll & 27 helper for 5x540 sqm
7. Excise duty on supply :
Excise duty is applicable on supply of fabricated parts. The cost of materials is inclusive of all
taxes/ duties. Therefore, for purpose of rate analysis 75 percent of total cost excluding the cost
of materials ( assuming 25 % erection cost ) is considered for assessing excise duty.
8. Use rate of materials :
Cost of welding set @ Rs: 3375.00 / Each Rs: 3375.00
Life of welding set : 1000 hours
Use rate of welding set per hour ( cost / life ) Rs: 3.38
Cost of gas cutting set @ Rs: 1125.00 / Each Rs: 1125
Life of gas cutting set : 600 hours
Use rate of gas cutting set per hr ( cost / life ) Rs: 1.88

34
GATES AND HOISTS

RATE ANALYSIS UNIT : 30.856 tonne


A. MATERIALS: 25 t capacity
Sl No Perticulars Unit Quantity Rate Amount
in Rs. in Rs.
1 Structural steel
Angles / beams / channels / bars kg 1743.00 20.00 34860.00
Plates / flats kg 19700.00 24.00 472800.00
Chequered plates kg 820.00 25.20 20664.00
2 Cast steel components :
Rope drums 2 Nos kg 1320.00 95.00 125400.00
Gears and pinions kg 1165.00 95.00 110675.00
Wheels / Pulleys kg 2255.00 85.00 191675.00
Plummer blocks / Couplings kg 817.00 85.00 69445.00
3 Forged steel components
Hook / Shackle kg 127.00 130.00 16510.00
4 Alloy steel components
Shafts kg 556.00 145.00 80620.00
Pins kg 524.00 175.00 91700.00
5 Bronze alloy components :
Bronze bearings / bush kg 181.00 380.00 68780.00
6 Wire rope 28 mm dia 6/37 construction kg 406.00 75.00 30450.00
7 MS Bolt / Nut / Washer kg 63.00 45.00 2835.00
8 MS pipe 32 mm dia for railing Rm 50.00 80.00 4000.00
9 Worm reducers Nos. 4.00 39375.00 157500.00
10 Electric motor 17.5 hp No. 1.00 28125.00 28125.00
Electric motor 5 hp Nos. 2.00 11250.00 22500.00
Electric motor 3 hp No. 1.00 6750.00 6750.00
11 Ele-magnetic / Thruster brakes Nos. 4.00 8437.50 33750.00
12 Electric cable / switch / control panel etc LS 3.00 5625.00 16875.00
13 Oxygen gas cum 579.00 40.00 23160.00
14 Acetyline gas cum 193.00 185.00 35705.00
15 Welding electrodes Nos 1123.00 4.00 4492.00
16 Welding electrodes ( LH ) Nos 10110.00 6.00 60660.00
17 Zinc chromate red oxide primer ltr 90.00 140.00 12600.00
18 Synthetic enamel ( 1st quality ) paint ltr 135.00 140.00 18900.00
19 Rust cleaner / inhibitor ltr 68.00 175.00 11900.00
20 Grease kg 50.00 90.00 4500.00
21 Use rate welding holder set Hour 1197.00 3.38 4039.88
22 Use rate gas cutting torch set Hour 150.00 1.88 281.25
23 Wire brush Nos 6.00 25.00 150.00
24 Sundries LS 200.00 22.50 4500.00
TOTAL Rs: 1766802.13
Add for small Tools and Plants @ 1% Rs: 17668.02
Add for Contractor' Profit @ 10% Rs: 176680.21
Add for Contrators' Overheads @ 5% Rs: 88340.11
Total cost of Materials Rs: 2049490.47

B. MACHINERY:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Welding transformer Hour 1197.00 9.00 10773.00
Fuel / Energy charges Hour 748.00 49.00 36652.00
2 Tower crane 5 t capacity Hour 6.00 763.00 4578.00
Fuel / Energy charges Hour 6.00 106.00 636.00
3 Pug cutting machine Hour 235.00 13.00 3055.00

35
GATES AND HOISTS

Fuel / Energy charges Hour 235.00 2.00 470.00


4 Mobile derric crane Hour 100.00 261.00 26100.00
Fuel / Energy charges Hour 100.00 117.00 11700.00
5 Grinding machine Hour 32.00 15.00 480.00
Fuel / Energy charges Hour 32.00 20.00 640.00
6 Drilling machines Hour 16.00 15.00 240.00
Fuel / Energy charges Hour 16.00 20.00 320.00
7 Sundries LS 500.00 22.50 11250.00
TOTAL Rs: 106894.00
Add for small Tools and Plants @ 1% Rs: 1068.94
Add for Contractor' Profit on DPOL / Energy @ 10% Rs: 6166.80
Add for Contrators' Overheads @ 5% Rs: 5344.70
Total hire charges of Machinery Rs: 119474.44

C. LABOUR:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Crew for Mobile crane Hour 100.00 32.90 3290.00
2 Crew for Tower crane Hour 6.00 36.05 216.30
3 Crew for Drilling machine Hour 16.00 35.00 560.00
4 Crew for Grinding machine Hour 32.00 35.00 1120.00
5 Foreman Day 74.00 108.65 8040.10
6 Marker / Fabricator / Erector Day 124.00 93.70 11618.80
7 Gas cutter Day 48.00 93.70 4497.60
8 Welder ( General ) Day 112.00 93.70 10494.40
9 Khalasi Day 20.00 83.65 1673.00
10 Helper fabrication / erection Day 350.00 81.60 28560.00
11 Helper for cleaning / painting Day 63.00 81.60 5140.80
12 Painter Cl - II Day 135.00 81.60 11016.00
13 Electrician Day 10.00 82.65 826.50
TOTAL Rs: 87053.50
Add for small Tools and Plants @ 1% Rs: 870.54
Add for Contractor' Profit @ 10% Rs: 8705.35
Add for hidden cost on Labour @ 15% Rs: 13058.03
Add for additional hidden cost on labour @ 15% Rs: 13058.03
Add for Contrators' Overheads @ 5% Rs: 4352.68
Total cost of Labour Rs: 127098.11

ABSTRACT:
A. Cost of Materials Rs: 2049490.47
B. Hire charges of Machinery Rs: 119474.44
C. Cost of Labour Rs: 127098.11
Total Rs: 2296063.02
Add for excise duty on 75 percent cost
excluding cost of materials @ 18.00% Rs: 33287.29
Add for insurance charges @ 1.00% Rs: 22960.63
Add for designs and drawings @ 2.5% Rs: 57401.58
Add for zigs / supports / winches / chain-pulley @ 2.5% Rs: 57401.58
Add for power supply arrangements @ 2.5% Rs: 57401.58
Add for enabling works @ 2% Rs: 45921.26
Total Rs: 2570436.93
Add for 2 rehandling leads for 1 km including loading and unloading :
Fabricated parts 2x30.856 tonnes @ Rs: 81.30 / tonne Rs: 5017.19

36
GATES AND HOISTS

Add for transportation upto work site @ 3% Rs: 77113.11


Total cost for 30.856 tonne Rs: 2652567.22
25.000 t capacity
Rate per tonne Rs: 85970.00
Rate per tonne capacity Rs: 106100.00

SECTION: GATE / HOIST & ALLIED WORKS. YEAR: 2003-2004 ITEM No: 9

ITEM: Design, fabrication, supply, erection and commissioning of rail track using 45 kg / m standard
rails on spillway bridge for movement of gantry crane for handling and operating spillway
stoplog gate elements / river sluice / canal sluice emergency gate including cost of all materials,
machinery, labour, aligning, anchoring, welding, cleaning etc., complete as per specifications
and approved drawings with all leads and lifts.

DATA: Rail track for moving gantry crane consists of 45 kg / m standard rails fixed by welding and
bolting to anchors embedded in concrete at intervals. The width of track shall be as per the
requirement of gantry long travel specifications.
Consider track length of 200 m for rate analysis.
Details of material / Gas cutting / Welding considered for rate analysis are based on 25 tonne
capacity moving gantry crane drawings for spillway of Alamatti dam.
Weight of 45 kg / m rails ( 2 x 200 x 45 ) : 18000.00
Add for anchors and fixtures @ 15 % including wastage : 2700.00
Total weight in tonnes : 20700.00
Actual weight of materials as per data : 20.722 t
1. Requirement of materials : as per fabrication drawings ( for details refer Item : 9 of Annexer )
a. Structural steel conforming to IS : 2062 :
Structural steel angles / beams / channels / bars with 2.5 % wastage : 1570 kg
Structural steel plates / flats with 2.5 % wastage : 975 kg
b. Bolt / Nut / Washer conforming to IS : 1363 :
MS bolts and nuts with 2.5 % wastage : 246 kg
c. Standard Rails 45 kg / m with 2.5 % wastage : 18450 kg
d. Welding electrodes :
Welding electrodes for stitch welding at 10 % of total with 2.5 % wastage : 180 Nos
Welding electrodes for run welding at 90 % of total with 2.5 % wastage : 1625 Nos
2. Cutting :
Total length of cutting assuming cutting for 2 sides : 222 Rm
For cutting structural steel sections to required sizes gas cutting is assumed.
Length of steel to be cut by using gas cutting torch manually : 222 m
Time for gas cutting manually assuming average cutting progress of 2 m / hour : 111 hours
Acetelyne gas @ 0.6 cum / hour ( 111 x 0.60 ) : 67 cum
Oxygen gas @ 1.8 cum / hour ( 111 x 1.80 ) : 201 cum
Use of gas cutting torch with 50 min / hr working ( 111 x 60 / 50 ) : 133 hours
3. Welding :
Length of welding : 210 m
For stich welding @ 2 hrs usage / shift & @ 15 electrodes / hr
( 180 / 15 ) x 8 / 2 : 48 hours
For run welding @ 6 hrs usage / shift & @ 15 electrodes / hr
( 1625 / 15 ) x 8 / 6 : 145 hours
Total : 193 hours
Deploy welding transformer for 193 hours.
Fuel / Energy charges @ 25 % hrs for stitch welding & @ 75 % hrs for run welding.
( 48 x 0.25 + 145 x 0.75 ) : 121 hours
4. Surface cleaning and painting :
For painting buffers and supporting plates 0.5 ltr zinc rich epoxy primer and 1 ltr coal tar epoxy
paint considered.

37
GATES AND HOISTS

5. Requirement of other machinery :


For drilling holes for anchor bolts 50 hours use of drilling machine considered.
For grinding edges of parts requiring finishing 8 hours use of grinding machine considered.
For handling and erection mobile derric crane for 4 hours considered.
6. Requirement of work force :
Work component Foreman Marker / Gas cutter / Helper
Fabricator / Welder
Erector
Cutting sections 133 hours --- 17 17 17
Drilling holes for anchors / supports --- 6 --- 6
Erection /stitch welding anchors 48 hours 3 6 --- 6
Erection of rails & fixing clamps 2 2 --- 4
Run welding 145 hours 2 --- 18 18
Finishing / checking / cleaning 1 1 --- 1
Total : 8 32 35 52
Note : It is assumed that all stitch welding will be done by fabricator. Hence, no separate provision is
considered for welder for stitch welding.
1 Painter Cl- II for cleaning and painting.
7. Excise duty on supply :
Excise duty is applicable on supply of fabricated parts. The cost of materials is inclusive of all
taxes/ duties. Therefore, for purpose of rate analysis 75 percent of total cost excluding the cost
of materials ( assuming 25 % erection cost ) is considered for assessing excise duty.
8. Use rate of materials :
Cost of welding set @ Rs: 3375.00 / Each Rs: 3375.00
Life of welding set : 1000 hours
Use rate of welding set per hour ( cost / life ) Rs: 3.38
Cost of gas cutting set @ Rs: 1125.00 / Each Rs: 1125
Life of gas cutting set : 600 hours
Use rate of gas cutting set per hr ( cost / life ) Rs: 1.88

RATE ANALYSIS UNIT : 200.000 Rm


A. MATERIALS:
Sl No Perticulars Unit Quantity Rate Amount
in Rs. in Rs.
1 Str steel angle / beam / channel / bars kg 1570.00 20.00 31400.00
2 Structural steel plate / flats kg 975.00 24.00 23400.00
3 Rails kg 18450.00 24.50 452025.00
4 MS bolts and nuts kg 246.00 45.00 11070.00
5 Oxygen gas cum 201.00 40.00 8040.00
6 Acetyline gas cum 67.00 185.00 12395.00
7 Welding electrodes Nos 1805.00 4.00 7220.00
8 Zinc rich epoxy primer ltr 0.50 525.00 262.50
9 Coal tar epoxy paint ltr 1.00 131.00 131.00
10 Use rate welding holder set Hour 193.00 3.38 651.38
11 Use rate gas cutting torch set Hour 133.00 1.88 249.38
12 Sundries LS 10.00 22.50 225.00
TOTAL Rs: 547069.25
Add for small Tools and Plants @ 1% Rs: 5470.69
Add for Contractor' Profit @ 10% Rs: 54706.93
Add for Contrators' Overheads @ 5% Rs: 27353.46
Total cost of Materials Rs: 634600.33

38
GATES AND HOISTS

B. MACHINERY:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Welding transformer Hour 193.00 9.00 1737.00
Fuel / Energy charges Hour 121.00 49.00 5929.00
2 Mobile derric crane Hour 4.00 261.00 1044.00
Fuel / Energy charges Hour 4.00 117.00 468.00
3 Grinding machine Hour 8.00 15.00 120.00
Fuel / Energy charges Hour 8.00 20.00 160.00
4 Drilling machines Hour 50.00 15.00 750.00
Fuel / Energy charges Hour 50.00 20.00 1000.00
5 Sundries LS 10.00 22.50 225.00
TOTAL Rs: 11433.00
Add for small Tools and Plants @ 1% Rs: 114.33
Add for Contractor' Profit on DPOL / Energy @ 10% Rs: 778.20
Add for Contrators' Overheads @ 5% Rs: 571.65
Total hire charges of Machinery Rs: 12897.18

C. LABOUR:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Crew for Mobile crane Hour 4.00 32.90 131.60
2 Crew for Drilling machine Hour 50.00 35.00 1750.00
3 Crew for Grinding machine Hour 8.00 35.00 280.00
4 Foreman Day 8.00 108.65 869.20
5 Marker / Fabricator / Erector Day 32.00 93.70 2998.40
6 Gas cutter Day 17.00 93.70 1592.90
7 Welder ( General ) Day 18.00 93.70 1686.60
8 Helper fabrication / erection Day 52.00 81.60 4243.20
9 Painter Cl- II Day 1.00 81.60 81.60
10 Electrician Day 1.00 82.65 82.65
TOTAL Rs: 13716.15
Add for small Tools and Plants @ 1% Rs: 137.16
Add for Contractor' Profit @ 10% Rs: 1371.62
Add for hidden cost on Labour @ 15% Rs: 2057.42
Add for additional hidden cost on labour @ 10% Rs: 1371.62
Add for Contrators' Overheads @ 5% Rs: 685.81
Total cost of Labour Rs: 19339.77

ABSTRACT:
A. Cost of Materials Rs: 634600.33
B. Hire charges of Machinery Rs: 12897.18
C. Cost of Labour Rs: 19339.77
Total Rs: 666837.28
Add for excise duty on 75 percent cost
excluding cost of materials @ 18.00% Rs: 4351.99
Add for insurance charges @ 1.00% Rs: 6668.37
Add for designs and drawings @ 2.5% Rs: 16670.93
Add for zigs / supports / winches / chain-pulley @ 2.5% Rs: 16670.93
Add for power supply arrangements @ 2.5% Rs: 16670.93
Add for enabling works @ 2% Rs: 13336.75
Total Rs: 741207.18
Add for 2 rehandling leads for 1 km including loading and unloading :
Fabricated parts 2x20.722 tonnes @ Rs: 81.30 / tonne Rs: 3369.40

39
GATES AND HOISTS

Add for transportation upto work site @ 3% Rs: 22236.22


Total cost for 200.000 Rm Rs: 766812.80
Rate per Rm Rs: 3830.00

SECTION: GATE / HOIST & ALLIED WORKS. YEAR: 2003-2004 ITEM No: 10

ITEM: Design, fabrication, supply, erection and commissioning of embedded parts ( without groove
liner ) consisting of sill beam, wheel tracks, seal seats, guide rails, breast wall liner ( upto one
vent height plus 1 m above the roof of vent ) etc., with all accessories for river / canal sluice
service gate including cost of all materials, machinery, labour, aligning, anchoring, welding,
finishing, cleaning, applying one coat of zinc rich epoxy primer and four coats of cold applied
coal tar epoxy paint etc., complete as per specifications and approved drawings with all leads
and lifts.

DATA: Embedded parts for river / canal sluice service gate without groove lining consist of sill beam,
wheel / seal tracks, breast wall lining and gate guide with accessories such as first / second
stage anchors.
The weight of embedded parts depends on the height of gate groove and height upto which
breast wall lining is to be provided. Weight of embedded parts will be about 50% of wt of gate.
Consider embedded parts for river sluice service gate for sluice opening of size 1.5 m x 3 m.
Weight of breast wall lining for 20 mm MS plate and 6 mm SS plate including stiffeners and
anchors will be about 250 kg per sqm area of breast wall.
Details of material / Gas cutting / Welding considered for rate analysis are based on embedded
parts drawings for river sluice service gate of Upper Tunga dam.
Weight of embedded parts in tonne for 1.5 m x 3 m opening based on empirical formula :
Size of gate for 1.5 m x 3 m opening : Length : 2.2 m Height : 3.3 m
Head of water considered : 16 m
Weight of embedded parts in tonnes = 0.0444 x ( L^2 x H x h )^0.659
Where ( L ) is length and ( H ) is height and ( h ) is head of water in metres.
= 0.0444 x ( 2.2 x 2.2 x 3.3 x 16 ) ^ 0.659 : 1.714 tonnes
Weight of breast wall lining about 7 sqm @ 250 kg / sqm 1.750 tonnes
Total : 3.464 tonnes
The actual weight of embedded parts as per data sheet 3.172 tonnes
Consider actual weight for data rate analysis.
1. Requirement of materials : as per fabrication drawings ( for details refer Item : 10 of Annexer )
a. Structural steel conforming to IS : 2062 :
Structural steel angles / beams / channels / bars with 2.5 % wastage 603 kg
Structural steel plates / flats with 2.5 % wastage 2162 kg
b. Alloy steel components conforming to IS : 1570 :
Stainless steel plates / flats 424.00 kg
c. Bolt / Nut / Washer conforming ti IS : 1363 :
MS bolts and nuts with 2.5 % wastage 62.5 kg
d. Welding electrodes :
Welding electrodes for stitch welding at 10 % of total with 2.5 % wastage 109 Nos
Welding electrodes ( SS ) for stitch welding at 10 % of total with 2.5 % wastage 39 Nos
Welding electrodes ( LH ) for run welding at 90 % of total with 2.5 % wastage 982 Nos
Welding electrodes ( SS ) for run welding at 90 % of total with 2.5 % wastage 348 Nos
2. Cutting :
Length of cutting assuming cutting for 2 sides as per data sheet : 152 Rm
Add for variations ( cutting for more than 2 sides / odd shapes etc ) at 10 % : 15 Rm
Total length of cutting : 167 Rm
For cutting structural steel sections to required size gas cutting is assumed for cutting angles /
beams / channels / round bars. For plates / flats less than 12 mm in thickness plate shearing
machine and for the remaining sections pug cutting machine is considered.

40
GATES AND HOISTS

Length of steel to be cut by using gas manually 30 m


Length of steel to be cut by gas using pug cutting machine 107 m
Length of steel to be cut by using shearing machine 30 m
Time for gas cutting manually assuming average cutting progress of 2 m / hour 15 hours
Time for gas cutting by pug cutting machine at ( av ) 3 m / hour 36 hours
Time for cutting by shearing machine at av. 10 m / hr progress 3 hours
Acetelyne gas @ 0.6 cum / hour ( 51 x 0.60 ) 31 cum
Oxygen gas @ 1.8 cum / hour ( 51 x 1.80 ) 93 cum
Use of gas cutting torch with 50 min / hr working ( 15 x 60 / 50 ) 18 hours
Use of pug cutting machine with 50 min / hr working ( 36 x 60 / 50 ) 43 hours
Use of shearing machine with 50 min / hr working ( 3 x 60 / 50 ) 4 hours
3. Welding :
Length of welding as per data sheet 191 m
For stich welding @ 2 hrs usage / shift & @ 15 electrodes / hr
( 109 + 39 ) x 8 / 15 / 2 40 hours
For run welding @ 6 hrs usage / shift & @ 15 electrodes / hr
( 982 + 348 ) x 8 / 15 / 6 118 hours
Total : 158 hours
Deploy welding transformer for 158 hours.
Fuel / Energy charges @ 25 % hrs for stitch welding & @ 75 % hrs for run welding.
( 40 x 0.25 + 118 x 0.75 ) : 99 hours
4. Planing SS plates for wheel / seal tracks :
For surface finishing of SS plates for wheel / seal tracks planing machine is considered.
Length of SS plate for surface finishing by planing machine 30 Rm
Length of planing at a time for 4 m stroke planing machine 3 Rm
Time for planing 3 m length section with 50 min / hour working 8 hours
Time for planing 30 m SS plates ( 30 x 8 / 3 ) 80 hours
5. Surface cleaning and painting :
Painting area for embedded parts at 10 sqm / tonne 32 sqm
1 coat of zinc rich epoxy primer 40 micron dry film each coat.
Quantity of primer paint for 32 sqm @ 9 sqm / ltr / coat 4 ltr
4 coats of coal tar epoxy paint 100 micron dry film each coat.
Quantity of coal tar epoxy paint for 32 sqm @ 6 sqm / ltr / coat 22 ltr
As surface cleaning by sand blasting is hazardous, it is proposed to adopt chemical treatment
to remove grease, rust, scaling etc., and to form phasphate coating to prevent further rusting
before applying primer painting.
Quantity of rust cleaner / inhibitor at 8 sqm / ltr 4 ltr
6. Requirement of other machinery :
For drilling holes for anchor bolts use of drilling machine for 10 hours considered.
For grinding weld joints and edges requiring finishing use of grinding machine for 8 hours
considered.
For handling parts during fabrication and erection use of mobile derric crane for 4 hours and
stationery derric crane for 8 hours considered
7. Requirement of work force :
Work component Foreman Marker / Gas cutter / Helper
Fabricator / Welder
Erector
Cutting sections 65 hours 4 8 8 16
Drilling holes for anchors / supports 1 1 2
Fbricating by stitch welding 40 hours 2 5 10
Run welding 118 hours 2 15 15
Erection of first stage anchors 3 6 6
Erection of Sill beam / Tracks / Guide 2 4 8

41
GATES AND HOISTS

Erection of Breast wall 2 4 8


Finishing / checking / cleaning 1 1 2
Total : 17 29 23 67
Note : It is assumed that all stitch welding will be done by fabricator. Hence, no separate provision is
considered for welder for stitch welding.
For surface cleaning by chemical cleaner
and wire brushing at 15 sqm / day : 2 helper for 32 sqm
For painting 1 coat primer and 4 coats
finishing paint at 15 sqm / day : 11 painter Cl-ll & 2 helper for 5 x 32 sqm
8. Excise duty on supply :
Excise duty is applicable on supply of fabricated parts. The cost of materials is inclusive of all
taxes/ duties. Therefore, for purpose of rate analysis 75 percent of total cost excluding the cost
of materials ( assuming 25 % erection cost ) is considered for assessing excise duty.
9. Use rate of materials :
Cost of welding set @ Rs: 3375.00 / Each Rs: 3375.00
Life of welding set : 1000 hours
Use rate of welding set per hour ( cost / life ) Rs: 3.38
Cost of gas cutting set @ Rs: 1125.00 / Each Rs: 1125
Life of gas cutting set : 600 hours
Use rate of gas cutting set per hr ( cost / life ) Rs: 1.88

RATE ANALYSIS UNIT : 3.172 tonne


A. MATERIALS:
Sl No Perticulars Unit Quantity Rate Amount
in Rs. in Rs.
1 Str steel angle / beam / channel / bars kg 603.00 20.00 12060.00
2 Structural steel plate / flats kg 2162.00 24.00 51888.00
3 Stainless steel plate / flats kg 424.00 90.00 38160.00
4 MS bolts and nuts kg 62.50 45.00 2812.50
5 Oxygen gas cum 93.00 40.00 3720.00
6 Acetyline gas cum 31.00 185.00 5735.00
7 Welding electrodes Nos 109.00 4.00 436.00
8 Welding electrodes ( LH ) Nos 982.00 6.00 5892.00
9 Welding electrodes ( stainless steel ) Nos 387.00 35.00 13545.00
10 Zinc rich epoxy primer ltr 4.00 525.00 2100.00
11 Coal tar epoxy paint ltr 22.00 131.00 2882.00
12 Rust cleaner / inhibitor ltr 4.00 175.00 700.00
13 Use rate welding holder set Hour 158.00 3.38 533.25
14 Use rate gas cutting torch set Hour 18.00 1.88 33.75
15 Wire brush Nos 1.00 25.00 25.00
16 Sundries LS 10.00 22.50 225.00
TOTAL Rs: 140747.50
Add for small Tools and Plants @ 1% Rs: 1407.48
Add for Contractor' Profit @ 10% Rs: 14074.75
Add for Contrators' Overheads @ 5% Rs: 7037.38
Total cost of Materials Rs: 163267.10

B. MACHINERY:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Welding transformer Hour 158.00 9.00 1422.00
Fuel / Energy charges Hour 99.00 49.00 4851.00
2 Plate shearing machine Hour 4.00 47.00 188.00
Fuel / Energy charges Hour 4.00 82.00 328.00

42
GATES AND HOISTS

3 Pug cutting machine Hour 43.00 13.00 559.00


Fuel / Energy charges Hour 43.00 2.00 86.00
4 Planing machine Hour 80.00 66.00 5280.00
Fuel / Energy charges Hour 80.00 61.00 4880.00
5 Mobile derric crane Hour 4.00 261.00 1044.00
Fuel / Energy charges Hour 4.00 117.00 468.00
6 Stationery derric crane Hour 8.00 50.00 400.00
Fuel / Energy charges Hour 8.00 5.00 40.00
7 Grinding machine Hour 8.00 15.00 120.00
Fuel / Energy charges Hour 8.00 20.00 160.00
8 Drilling machines Hour 10.00 15.00 150.00
Fuel / Energy charges Hour 10.00 20.00 200.00
9 Sundries LS 10.00 22.50 225.00
TOTAL Rs: 20401.00
Add for small Tools and Plants @ 1% Rs: 204.01
Add for Contractor' Profit on DPOL / Energy @ 10% Rs: 1123.80
Add for Contrators' Overheads @ 5% Rs: 1020.05
Total hire charges of Machinery Rs: 22748.86

C. LABOUR:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Crew for Mobile crane Hour 4.00 32.90 131.60
2 Crew for Shearing machine Hour 4.00 26.70 106.80
3 Crew for Planing machine Hour 80.00 42.75 3420.00
4 Crew for Drilling machine Hour 10.00 35.00 350.00
5 Crew for Grinding machine Hour 8.00 35.00 280.00
6 Foreman Day 17.00 108.65 1847.05
7 Marker / Fabricator / Erector Day 29.00 93.70 2717.30
8 Gas cutter Day 8.00 93.70 749.60
9 Welder ( General ) Day 11.00 93.70 1030.70
10 Welder ( X - ray ) Day 4.00 103.07 412.28
11 Helper fabrication / erection Day 67.00 81.60 5467.20
12 Helper for cleaning / painting Day 4.00 81.60 326.40
13 Painter Cl - II Day 11.00 81.60 897.60
14 Electrician Day 2.00 82.65 165.30
TOTAL Rs: 17901.83
Add for small Tools and Plants @ 1% Rs: 179.02
Add for Contractor' Profit @ 10% Rs: 1790.18
Add for hidden cost on Labour @ 15% Rs: 2685.27
Add for additional hidden cost on labour @ 10% Rs: 1790.18
Add for Contrators' Overheads @ 5% Rs: 895.09
Total cost of Labour Rs: 25241.58

ABSTRACT:
A. Cost of Materials Rs: 163267.10
B. Hire charges of Machinery Rs: 22748.86
C. Cost of Labour Rs: 25241.58
Total Rs: 211257.54
Add for excise duty on 75 percent cost
excluding cost of materials @ 18.00% Rs: 6478.71
Add for insurance charges @ 1.00% Rs: 2112.58
Add for designs and drawings @ 2.5% Rs: 5281.44
Add for zigs / supports / winches / chain-pulley @ 2.5% Rs: 5281.44

43
GATES AND HOISTS

Add for power supply arrangements @ 2.5% Rs: 5281.44


Add for enabling works @ 2% Rs: 4225.15
Total Rs: 239918.29
Add for 2 rehandling leads for 1 km including loading and unloading :
Fabricated parts 2x3.172 tonnes @ Rs: 81.30 / tonne Rs: 515.77
Add for transportation upto work site @ 3% Rs: 7197.55
Total cost for 3.172 tonne Rs: 247631.61
Rate per tonne Rs: 78070.00

SECTION: GATE / HOIST & ALLIED WORKS. YEAR: 2003-2004 ITEM No: 11

ITEM: Design, fabrication, supply, erection and commissioning of embedded parts ( with groove
liner upto breast wall level ) consisting of sill beam, wheel tracks, seal seats, guide rails,
breast wall liner ( upto one vent height plus 1 m above the roof of vent ) etc., with all accessories
for river / canal sluice service gate including cost of all materials, machinery, labour,
aligning, anchoring, welding, finishing, cleaning, applying one coat of zinc rich epoxy primer
and four coats of cold applied coal tar epoxy paint etc., complete as per specifications and
approved drawings with all leads and lifts.

DATA: Embedded parts for river sluice service gate consist of sill beam, wheel / seal tracks, groove
lining upto breast wall level, breast wall lining upto 1 vent plus 1 m above top of vent, gate guide
etc., with all accessories such as first stage anchors.
The wt of embedded parts depends on the height of gate groove and height upto which breast
wall lining is to be provided. Generally wt of embedded parts will be about 50% of wt of gate.
Weight of breast wall lining for 20 mm MS plate and 6 mm SS plate including stiffeners and
anchors will be about 250 kg per sqm area of breast wall.
Weight of groove liner for 20 mm MS plate including stiffeners and anchors will be about
200 kg / sqm area of groove liner.
Consider embedded parts for river sluice service gate for sluice opening of size 2.5 m x 3 m.
Details of material / Gas cutting / Welding considered for rate analysis are based on embedded
parts drawings including groove liner for river sluice service gate of Kodasalli dam.
Weight of embedded parts in tonne for 2.5 m x 3 m opening based on empirical formula :
Size of gate for 2.5 m x 3 m opening : Length : 3.2 m Height : 3.3 m
Head of water considered : 34 m
Weight of embedded parts in tonnes = 0.0444 x ( L^2 x H x h )^0.659
Where ( L ) is length and ( H ) is height and ( h ) is head of water in metres.
= 0.0444 x ( 3.2 x 3.2 x 3.3 x 34 ) ^ 0.659 : 4.615 tonnes
Weight of breast wall lining about 12 sqm @ 250 kg / sqm : 3.000 tonnes
Weight of groove liner about 15 sqm @ 200 kg / sqm : 3.000 tonnes
: 10.615 tonnes
The actual weight of embedded parts as per data sheet : 10.657 tonnes
Consider actual weight for data rate analysis.
1. Requirement of materials : as per fabrication drawings ( for details refer Item : 11 of Annexer )
a. Structural steel conforming to IS : 2062 :
Structural steel angles / beams / channels / bars with 2.5 % wastage : 698 kg
Structural steel plates / flats with 2.5 % wastage : 9195 kg
b. Alloy steel components conforming to IS : 1570 :
Stainless steel plates / flats : 846 kg
c. Bolt / Nut / Washer conforming ti IS : 1363 :
MS bolts and nuts with 2.5 % wastage : 185 kg
d. Welding electrodes :
Welding electrodes for stitch welding at 10 % of total with 2.5 % wastage : 535 Nos
Welding electrodes (SS) for stitch welding at 10 % of total with 2.5 % wastage : 64 Nos
Welding electrodes ( LH ) for run welding at 90 % of total with 2.5 % wastage : 4815 Nos

44
GATES AND HOISTS

Welding electrodes ( SS ) for run welding at 90 % of total with 2.5 % wastage : 576 Nos
2. Cutting :
Length of cutting assuming cutting for 2 sides as per data sheet : 301 Rm
Add for variations ( cutting for more than 2 sides / odd shapes etc ) at 10 % : 30 Rm
Total length of cutting : 331 Rm
For cutting structural steel sections to required size gas cutting is assumed for cutting angles /
beams / channels / round bars. For plates / flats less than 12 mm in thickness plate shearing
machine and for the remaining sections pug cutting machine is considered.
Length of steel to be cut by using gas manually : 60 m
Length of steel to be cut by gas using pug cutting machine : 211 m
Length of steel to be cut by using shearing machine : 60 m
Time for gas cutting manually assuming average cutting progress of 2 m / hour : 30 hours
Time for gas cutting by pug cutting machine at ( av ) 3 m / hour : 70 hours
Time for cutting by shearing machine at av. 10 m / hr progress : 6 hours
Acetelyne gas @ 0.6 cum / hour ( 100 x 0.60 ) : 60 cum
Oxygen gas @ 1.8 cum / hour ( 100 x 1.80 ) : 180 cum
Use of gas cutting torch with 50 min / hr working ( 30 x 60 / 50 ) 36 hours
Use of pug cutting machine with 50 min / hr working ( 70 x 60 / 50 ) 84 hours
Use of shearing machine with 50 min / hr working ( 6 x 60 / 50 ) 7 hours
3. Welding :
Length of welding as per data sheet : 552 m
For stich welding @ 2 hrs usage / shift & @ 15 electrodes / hr
( 535 + 64 ) x 8 / 15 / 2 : 160 hours
For run welding @ 6 hrs usage / shift & @ 15 electrodes / hr
( 4815 + 576 ) x 8 / 15 / 6 : 479 hours
Total : 639 hours
Deploy welding transformer for 639 hours.
Fuel / Energy charges @ 25 % hrs for stitch welding & @ 75 % hrs for run welding.
( 160 x 0.25 + 479 x 0.75 ) : 400 hours
4. Planing SS plates for wheel / seal tracks :
For surface finishing of SS plates for wheel / seal tracks planing machine is considered.
Length of SS plate for surface finishing by planing machine : 30 Rm
Length of planing at a time for 4 m stroke planing machine : 3 Rm
Time for planing 3 m length section with 50 min / hour working : 8 hours
Time for planing 30 m SS plates ( 30 x 8 / 3 ) : 80 hours
5. Surface cleaning and painting :
Painting area for embedded parts at 10 sqm / tonne : 107 sqm
1 coat of zinc rich epoxy primer 40 micron dry film each coat.
Quantity of primer paint for 107 sqm @ 9 sqm / ltr / coat : 12 ltr
4 coats of coal tar epoxy paint 100 micron dry film each coat.
Quantity of coal tar epoxy paint for 107 sqm @ 6 sqm / ltr / coat : 72 ltr
As surface cleaning by sand blasting is hazardous, it is proposed to adopt chemical treatment
to remove grease, rust, scaling etc., and to form phasphate coating to prevent further rusting
before applying primer painting.
Quantity of rust cleaner / inhibitor at 8 sqm / ltr : 14 ltr
6. Requirement of other machinery :
For drilling holes for anchor bolts use of drilling machine for 50 hours considered.
For grinding weld joints and edges requiring finishing use of grinding machine for 25 hours
considered.
For handling of parts during fabrication and erection mobile derric crane for 20 hours and
stationery derric crane for 40 hours considered.

45
GATES AND HOISTS

7. Requirement of work force :


Work component Foreman Marker / Gas cutter / Helper
Fabricator / Welder
Erector
Cutting sections 127 hours 8 16 16 32
Drilling holes for anchors / supports 3 6 --- 6
Fbricating by stitch welding 160 hours 10 20 --- 40
Run welding 479 hours 6 --- 60 60
Erection of first stage anchors 5 10 --- 10
Erection of Sill beam / Tracks / Guide 2 4 --- 8
Erection of Breast wall liner 2 4 --- 8
Erection of groove liners 3 6 --- 12
Finishing / cleaning 1 2 --- 4
Total : 40 68 76 180
Note : It is assumed that all stitch welding will be done by fabricator. Hence, no separate provision is
considered for welder for stitch welding.
For surface cleaning by chemical cleaner
and wire brushing at 15 sqm / day : 7 helper for 107 sqm
For painting 1 coat primer and 4 coats
finishing paint at 15 sqm / day : 36 painter Cl-ll & 6 helper for 5 x 107 sqm
8. Excise duty on supply :
Excise duty is applicable on supply of fabricated parts. The cost of materials is inclusive of all
taxes/ duties. Therefore, for purpose of rate analysis 75 percent of total cost excluding the cost
of materials ( assuming 25 % erection cost ) is considered for assessing excise duty.
9. Use rate of materials :
Cost of welding set @ Rs: 3375.00 / Each Rs: 3375.00
Life of welding set : 1000 hours
Use rate of welding set per hour ( cost / life ) Rs: 3.38
Cost of gas cutting set @ Rs: 1125.00 / Each Rs: 1125
Life of gas cutting set : 600 hours
Use rate of gas cutting set per hr ( cost / life ) Rs: 1.88

RATE ANALYSIS UNIT : 10.657 tonne


A. MATERIALS:
Sl No Perticulars Unit Quantity Rate Amount
in Rs. in Rs.
1 Str steel angle / beam / channel / bars kg 698.00 20.00 13960.00
2 Structural steel plate / flats kg 9195.00 24.00 220680.00
3 Stainless steel plate / flats kg 846.00 90.00 76140.00
4 MS bolts and nuts kg 185.00 45.00 8325.00
5 Oxygen gas cum 180.00 40.00 7200.00
6 Acetyline gas cum 60.00 185.00 11100.00
7 Welding electrodes Nos 535.00 4.00 2140.00
8 Welding electrodes ( LH ) Nos 4815.00 6.00 28890.00
9 Welding electrodes ( stainless steel ) Nos 640.00 35.00 22400.00
10 Zinc rich epoxy primer ltr 12.00 525.00 6300.00
11 Coal tar epoxy paint ltr 72.00 131.00 9432.00
12 Rust cleaner / inhibitor ltr 14.00 175.00 2450.00
13 Use rate welding holder set Hour 639.00 3.38 2156.63
14 Use rate gas cutting torch set Hour 36.00 1.88 67.50
15 Wire brush Nos 2.00 25.00 50.00
16 Sundries LS 50.00 22.50 1125.00
TOTAL Rs: 412416.13
Add for small Tools and Plants @ 1% Rs: 4124.16

46
GATES AND HOISTS

Add for Contractor' Profit @ 10% Rs: 41241.61


Add for Contrators' Overheads @ 5% Rs: 20620.81
Total cost of Materials Rs: 478402.71

B. MACHINERY:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Welding transformer Hour 639.00 9.00 5751.00
Fuel / Energy charges Hour 400.00 49.00 19600.00
2 Plate shearing machine Hour 7.00 47.00 329.00
Fuel / Energy charges Hour 7.00 82.00 574.00
3 Pug cutting machine Hour 84.00 13.00 1092.00
Fuel / Energy charges Hour 84.00 2.00 168.00
4 Planing machine Hour 80.00 66.00 5280.00
Fuel / Energy charges Hour 80.00 61.00 4880.00
5 Mobile derric crane Hour 20.00 261.00 5220.00
Fuel / Energy charges Hour 20.00 117.00 2340.00
6 Stationery derric crane Hour 40.00 50.00 2000.00
Fuel / Energy charges Hour 40.00 5.00 200.00
7 Grinding machine Hour 25.00 15.00 375.00
Fuel / Energy charges Hour 25.00 20.00 500.00
8 Drilling machines Hour 50.00 15.00 750.00
Fuel / Energy charges Hour 50.00 20.00 1000.00
9 Sundries LS 20.00 22.50 450.00
TOTAL Rs: 50509.00
Add for small Tools and Plants @ 1% Rs: 505.09
Add for Contractor' Profit on DPOL / Energy @ 10% Rs: 2971.20
Add for Contrators' Overheads @ 5% Rs: 2525.45
Total hire charges of Machinery Rs: 56510.74

C. LABOUR:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Crew for Mobile crane Hour 20.00 32.90 658.00
2 Crew for Shearing machine Hour 7.00 26.70 186.90
3 Crew for Planing machine Hour 80.00 42.75 3420.00
4 Crew for Drilling machine Hour 50.00 35.00 1750.00
5 Crew for Grinding machine Hour 25.00 35.00 875.00
6 Foreman Day 40.00 108.65 4346.00
7 Marker / Fabricator / Erector Day 68.00 93.70 6371.60
8 Gas cutter Day 16.00 93.70 1499.20
9 Welder ( General ) Day 55.00 93.70 5153.50
10 Welder ( X - ray ) Day 5.00 103.07 515.35
11 Helper fabrication / erection Day 180.00 81.60 14688.00
12 Helper for cleaning / painting Day 13.00 81.60 1060.80
13 Painter Cl - II Day 36.00 81.60 2937.60
14 Electrician Day 5.00 82.65 413.25
TOTAL Rs: 43875.20
Add for small Tools and Plants @ 1% Rs: 438.75
Add for Contractor' Profit @ 10% Rs: 4387.52
Add for hidden cost on Labour @ 15% Rs: 6581.28
Add for additional hidden cost on labour @ 10% Rs: 4387.52
Add for Contrators' Overheads @ 5% Rs: 2193.76
Total cost of Labour Rs: 61864.03

47
GATES AND HOISTS

ABSTRACT:
A. Cost of Materials Rs: 478402.71
B. Hire charges of Machinery Rs: 56510.74
C. Cost of Labour Rs: 61864.03
Total Rs: 596777.48
Add for excise duty on 75 percent cost
excluding cost of materials @ 18.00% Rs: 15980.59
Add for insurance charges @ 1.00% Rs: 5967.77
Add for designs and drawings @ 2.5% Rs: 14919.44
Add for zigs / supports / winches / chain-pulley @ 2.5% Rs: 14919.44
Add for power supply arrangements @ 2.5% Rs: 14919.44
Add for enabling works @ 2% Rs: 11935.55
Total Rs: 675419.71
Add for 2 rehandling leads for 1 km including loading and unloading :
Fabricated parts 2x10.657 tonnes @ Rs: 81.30 / tonne Rs: 1732.83
Add for transportation upto work site @ 3% Rs: 20262.59
Total cost for 10.657 tonne Rs: 697415.13
Rate per tonne Rs: 65440.00

SECTION: GATE / HOIST & ALLIED WORKS. YEAR: 2003-2004 ITEM No: 12

ITEM: Design, fabrication, supply, erection and commissioning of vent liner using 20 mm thick plates
with stiffeners and anchors for river sluice / canal sluice vents including cost of all materials,
machinery, labour, cutting, aligning, anchoring, welding, finishing, cleaning, applying one coat of
zinc rich epoxy primer and four coats of cold applied coal tar epoxy paint etc., complete with
all leads and lifts.

DATA: Vent lining consists of forming river / canal sluice of specified size using 20 mm thick structural
steel plates for the specified length. The liner plates are stiffened on the back side and anchors
are provided for embedment in concrete.
Consider vent lining for river / canal sluice of size 2.5 m x 3 m for analysis.
Consider vent lining for 3.40 m length of vent.
Details of material / Gas cutting / Welding considered for rate analysis are based on vent liner
drawings for river sluice vent of Kodasalli dam.
Finished area of lining : ( 2 x 3 x 3.4 + 2 x 2.5 x 3.4 ) : 37.40 sqm
Weight of 20 mm thick plate per sqm : 157.00 kg
Add 25 % for stiffeners / anchors / projections etc : 39.25 kg
Total requirement of steel for vent lining of sluice per sqm area : 196.25 kg
say : 200 kg
Quantity of steel required for 37.40 sqm : 7.480 tonnes
The actual weight of liner for 37.4 sqm as per data sheet : 7.281 tonnes
Consider actual weight for data rate analysis.
1. Requirement of materials : as per fabrication drawings ( for details refer Item : 12 of Annexer )
a. Structural steel conforming to IS : 2062 :
Structural steel plates / flats with 2.5 % wastage : 7463 kg
b. Welding electrodes :
Welding electrodes for stitch welding at 10 % of total with 2.5 % wastage : 344 Nos
Welding electrodes ( LH ) for run welding at 90 % of total with 2.5 % wastage : 3100 Nos
2. Cutting :
Length of cutting assuming cutting for 2 sides : 203 Rm
Add for variations ( cutting for more than 2 sides / odd shapes etc ) at 10 % : 20 Rm
Total : 223 Rm
For cutting structural steel sections to required sizes gas cutting is assumed since most of the
sections are above 10 mm thick.
Length of steel to be cut by using gas manually : 30 m

48
GATES AND HOISTS

Length of steel to be cut by gas using pug cutting machine : 193 m


Time for gas cutting manually assuming average cutting progress of 2 m / hour : 15 hours
Time for gas cutting by pug cutting machine at ( av ) 3 m / hour : 64 hours
Acetelyne gas @ 0.6 cum / hour ( 79 x 0.60 ) : 48 cum
Oxygen gas @ 1.8 cum / hour ( 79 x 1.80 ) : 144 cum
Use of gas cutting torch with 50 min / hr working : ( 15 x 60 / 50 ) : 18 hours
Use of pug cutting machine with 50 min / hr working ( 64 x 60: / 50 ) : 77 hours
3. Welding :
Length of welding : 420 Rm
For stich welding @ 2 hrs usage / shift & @ 15 electrodes / hr
( 344 / 15 ) x 8 / 2 : 92 hours
For run welding @ 6 hrs usage / shift & @ 15 electrodes / hr
( 3100 / 15 ) x 8 / 6 : 275 hours
Total : 367 hours
Deploy welding transformer for 367 hours.
Fuel / Energy charges @ 25 % hrs for stitch welding & @ 75 % hrs for run welding.
( 92 x 0.25 + 275 x 0.75 ) : 229 hours
4. Surface cleaning and painting :
Painting area for liner : 37.4 sqm
1 coat of zinc rich epoxy primer 40 micron dry film each coat.
Quantity of primer paint for 37.4 sqm @ 9 sqm / ltr / coat : 4 ltr
4 coats of coal tar epoxy paint 100 micron dry film each coat.
Quantity of coal tar epoxy paint for 37.4 sqm @ 6 sqm / ltr / coat : 25 ltr
As surface cleaning by sand blasting is hazardous, it is proposed to adopt chemical treatment
to remove grease, rust, scaling etc., and to form phasphate coating to prevent further rusting
before applying primer painting.
Quantity of rust cleaner / inhibitor at 8 sqm / ltr : 5 ltr
5. Requirement of other machinery :
For handling during fabrication and erection mobile derric crane for 8 hours and stationery derric
crane for 16 hours considered.
For grinding and finishing weld joints in liner plates 8 hours use of grinding machine considered.
6. Requirement of work force :
Work component Foreman Marker / Gas cutter / Helper
Fabricator / Welder
Erector
Cutting sections 95 hours 6 12 12 24
Fabricating by stitch welding 92 hours 6 12 --- 24
Run welding 275 hours 3 --- 34 34
Finishing / Cleaning 1 1 --- 1
Total : 16 25 46 83
Note : It is assumed that all stitch welding will be done by fabricator. Hence, no separate provision is
considered for welder for stitch welding.
For surface cleaning by chemical cleaner
and wire brushing at 15 sqm / day : 2 helper for 37.4 sqm
For painting 1 coat primer and 4 coats
finishing paint at 15 sqm / day : 12 painter Cl-ll & 2 helper for 5 x 37.4 sqm
7. Excise duty on supply :
Excise duty is applicable on supply of fabricated parts. The cost of materials is inclusive of all
taxes/ duties. Therefore, for purpose of rate analysis 75 percent of total cost excluding the cost
of materials ( assuming 25 % erection cost ) is considered for assessing excise duty.
8. Use rate of materials :
Cost of welding set @ Rs: 3375.00 / Each Rs: 3375.00
Life of welding set : 1000 hours
Use rate of welding set per hour ( cost / life ) Rs: 3.38
Cost of gas cutting set @ Rs: 1125.00 / Each Rs: 1125

49
GATES AND HOISTS

Life of gas cutting set : 600 hours


Use rate of gas cutting set per hr ( cost / life ) Rs: 1.88

RATE ANALYSIS UNIT : 37.400 sqm


A. MATERIALS:
Sl No Perticulars Unit Quantity Rate Amount
in Rs. in Rs.
1 Structural steel plates / flats kg 7463.00 24.00 179112.00
2 Oxygen gas cum 144.00 40.00 5760.00
3 Acetyline gas cum 48.00 185.00 8880.00
4 Welding electrodes Nos 344.00 4.00 1376.00
5 Welding electrodes ( LH ) Nos 3100.00 6.00 18600.00
6 Zinc rich epoxy primer ltr 4.00 525.00 2100.00
7 Coal tar epoxy paint ltr 25.00 131.00 3275.00
8 Rust cleaner / inhibitor ltr 5.00 175.00 875.00
9 Use rate welding holder set Hour 367.00 3.38 1238.63
10 Use rate gas cutting torch set Hour 18.00 1.88 33.75
11 Wire brush Nos 1.00 25.00 25.00
12 Sundries LS 20.00 22.50 450.00
TOTAL Rs: 221725.38
Add for small Tools and Plants @ 1% Rs: 2217.25
Add for Contractor' Profit @ 10% Rs: 22172.54
Add for Contrators' Overheads @ 5% Rs: 11086.27
Total cost of Materials Rs: 257201.44

B. MACHINERY:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Welding transformer Hour 367.00 9.00 3303.00
Fuel / Energy charges Hour 229.00 49.00 11221.00
2 Pug cutting machine Hour 77.00 13.00 1001.00
Fuel / Energy charges Hour 77.00 2.00 154.00
3 Mobile derric crane Hour 8.00 261.00 2088.00
Fuel / Energy charges Hour 8.00 117.00 936.00
4 Stationery derric crane Hour 16.00 50.00 800.00
Fuel / Energy charges Hour 16.00 5.00 80.00
5 Grinding machine Hour 8.00 15.00 120.00
Fuel / Energy charges Hour 8.00 20.00 160.00
6 Sundries LS 10.00 22.50 225.00
TOTAL Rs: 20088.00
Add for small Tools and Plants @ 1% Rs: 200.88
Add for Contractor' Profit on DPOL / Energy @ 10% Rs: 1277.60
Add for Contrators' Overheads @ 5% Rs: 1004.40
Total hire charges of Machinery Rs: 22570.88

C. LABOUR:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Crew for Mobile crane Hour 8.00 32.90 263.20
2 Crew for Grinding machine Hour 16.00 35.00 560.00
3 Foreman Day 16.00 108.65 1738.40
4 Marker / Fabricator / Erector Day 25.00 93.70 2342.50
5 Gas cutter Day 12.00 93.70 1124.40
6 Welder ( General ) Day 34.00 93.70 3185.80
7 Helper fabrication / erection Day 83.00 81.60 6772.80

50
GATES AND HOISTS

8 Helper for cleaning / painting Day 4.0081.60 326.40


9 Painter Cl - II Day 12.0081.60 979.20
10 Electrician Day 1.0082.65 82.65
TOTAL Rs: 17375.35
Add for small Tools and Plants @ 1% Rs: 173.75
Add for Contractor' Profit @ 10% Rs: 1737.54
Add for hidden cost on Labour @ 15% Rs: 2606.30
Add for additional hidden cost on labour @ 10% Rs: 1737.54
Add for Contrators' Overheads @ 5% Rs: 868.77
Total cost of Labour Rs: 24499.24

ABSTRACT:
A. Cost of Materials Rs: 257201.44
B. Hire charges of Machinery Rs: 22570.88
C. Cost of Labour Rs: 24499.24
Total Rs: 304271.56
Add for excise duty on 75 percent cost
excluding cost of materials @ 18.00% Rs: 6354.47
Add for insurance charges @ 1.00% Rs: 3042.72
Add for designs and drawings @ 2.5% Rs: 7606.79
Add for zigs / supports / winches / chain-pulley @ 2.5% Rs: 7606.79
Add for power supply arrangements @ 2.5% Rs: 7606.79
Add for enabling works @ 2% Rs: 6085.43
Total Rs: 342574.54
Add for 2 rehandling leads for 1 km including loading and unloading :
Fabricated parts 2x7.281 tonnes @ Rs: 81.30 / tonne Rs: 1183.89
Add for transportation upto work site @ 3% Rs: 10277.24
Total cost for 37.400 sqm Rs: 354035.67
Rate per sqm Rs: 9470.00

SECTION: GATE / HOIST & ALLIED WORKS. YEAR: 2003-2004 ITEM No: 13

ITEM: Design, fabrication, supply, erection, testing and commissioning of fixed wheel type vertical
lift service gate consisting of skin plate, vertical and horizontal girders, wheels, stiffeners, lifting
brackets, guide rollers, ballast blocks, teflon claded rubber seals etc., with all accessories for
river sluice / canal sluice vent including cost of all materials, machinery, labour, cutting,
aligning, welding, finishing, cleaning, applying one coat of zinc rich epoxy primer and three
coats of cold applied coal tar epoxy paint, seal fixing etc., complete as per specifications and
approved drawings with all leads and lifts.

DATA: Consider upstream seal vertical lift roller gate. The gate leaf consists of skin plate, horizontal
girders, vertical end girders, stiffeners, wheels, gate guide rollers, brackets for pulleys, seals
etc., with all accessories.
Consider river / canal sluice service gate for 2.5 m x 3 m sluice opening for analysis.
Details of material / Gas cutting / Welding considered for rate analysis are based on river sluice
gate drawings for 2.5 m x 3 m river sluice of Kodasalli dam.
Weight of gate leaf in tonne for vertical lift gate based on empirical formula :
Weight in tonnes = 0.0888 ( L^2 x H x h )^0.659
Where ( L ) is length and ( H ) is height of gate and ( h ) is head of water above sill in Rm.
For vent opening of 2.5 x 3.0 m the approximate size of gate leaf will be 3.2 x 3.3 m.
Head of water above sill of gate : 34 m
Weight in tonnes = 0.0888 ( 3.2 x 3.2 x 3.3 x 34 ) ^ 0.659 : 9.229
The actual weight of river sluice service gate as per data sheet : 9.202 tonnes
Consider actual weight for data rate analysis.

51
GATES AND HOISTS

1. Requirement of materials : as per fabrication drawings ( for details refer Item : 13 of Annexer )
a. Structural steel conforming to IS : 2062 :
Structural steel plates / flats with 2.5 % wastage : 4479 kg
b. Cast iron components conforming to IS : 210 :
Cast iron blocks for counter weight : 4100 kg
c. Alloy steel components conforming to IS : 1570 :
Wheel axles / Pins : 132 kg
d. Cast steel components conforming to IS : 1030 :
Wheels / guide rollers : 492 kg
e. Alluminium / Bronze alloy components conforming to IS : 305 :
Bearings / Bushes : 76 kg
f. Bolts / Nuts / Washers conforming to IS : 1363 :
SS bolts / nuts / washers with 2.5 % wastage : 55 kg
GI bolts / nuts / washers with 2.5 % wastage : 76 kg
MS bolts / nuts / washers with 2.5 % wastage : 4 kg
g. Rubber seal conforming to IS : 11855 :
Bottom seal ( flat type ) : 2.8 Rm
Side seals ( music note type teflon claded ) : 5.85 Rm
Top seal ( music note type teflon claded ) : 2.25 Rm
Corner seal ( teflon claded ) : 2 Nos
h. Welding electrodes :
Welding electrodes for stitch welding at 10 % of total with 2.5 % wastage : 282 Nos
Welding electrodes ( LH ) for run welding at 90 % of total with 2.5 % wastage : 2532 Nos
2. Cutting :
Length of cutting assuming cutting for 2 sides : 137 Rm
Add for variations ( cutting for more than 2 sides / odd shapes etc ) at 10 % : 14 Rm
Total : 151 Rm
For cutting structural steel sections to required sizes gas cutting is assumed since most of the
sections are above 10 mm thick.
Length of steel to be cut by using gas manually : 30 m
Length of steel to be cut by gas using pug cutting machine : 121 m
Time for gas cutting manually assuming average cutting progress of 2 m / hour : 15 hours
Time for gas cutting by pug cutting machine at ( av ) 3 m / hour : 40 hours
Acetelyne gas @ 0.6 cum / hour ( 55 x 0.60 ) : 33 cum
Oxygen gas @ 1.8 cum / hour ( 55 x 1.80 ) : 99 cum
Use of gas cutting torch with 50 min / hr working ( 15 x 60 / 50 ) : 18 hours
Use of pug cutting machine with 50 min / hr working ( 40 x 60 / 50 ) : 48 hours
3. Welding :
Length of welding : 281 Rm
For stich welding @ 2 hrs usage / shift & @ 15 electrodes / hr
( 282 / 15 ) x 8 / 2 : 75 hours
For run welding @ 6 hrs usage / shift & @ 15 electrodes / hr
( 2532 / 15 ) x 8 / 6 : 225 hours
Total : 300 hours
Deploy welding transformer for 300 hours.
Fuel / Energy charges @ 25 % hrs for stitch welding & @ 75 % hrs for run welding.
( 75 x 0.25 + 225 x 0.75 ) : 188 hours
4. Surface cleaning and painting :
Painting area for river sluice gate at 10 sqm / tonne : 92 sqm
1 coat of zinc rich epoxy primer 40 micron dry film each coat.
Quantity of primer paint for 92 sqm @ 9 sqm / ltr / coat : 10 ltr
3 coats of coal tar epoxy paint 100 micron dry film each coat.
Quantity of coal tar epoxy paint for 92 sqm @ 6 sqm / ltr / coat : 46 ltr
As surface cleaning by sand blasting is hazardous, it is proposed to adopt chemical treatment
to remove grease, rust, scaling etc., and to form phasphate coating to prevent further rusting

52
GATES AND HOISTS

before applying primer painting.


Quantity of rust cleaner / inhibitor at 8 sqm / ltr : 12 ltr
5. Requirement of other machinery :
For lowering gate leaf from hoist chamber use of tower crane for 1 hour considered.
For handling and erection mobile derric crane for 10 hours and stationery derric crane for 20 hrs
considered.
For drilling holes in skin plate, counter weight blocks, horizontal girders and seal clamps use of
drilling machine for 16 hours considered.
For grinding and finishing weld joints in skin plate and other locations 8 hours use of grinding
machine considered.
6. Requirement of work force :
Work component Foreman Marker / Gas cutter / Helper
Fabricator / Welder
Erector
Cutting sections 66 hours 4 8 8 16
Drilling holes for seal fixing 1 2 --- 2
Fabricating by stitch welding 75 hours 5 10 --- 20
Run welding 225 hours 3 --- 28 28
Fixing counter weight blocks 1 2 --- 4
Seal fixing 1 1 --- 2
Guide roller fixing / Cleaning / Lowering 1 2 --- 2
Total : 16 25 36 74
Note : It is assumed that all stitch welding will be done by fabricator. Hence, no separate provision is
considered for welder for stitch welding.
For surface cleaning by chemical cleaner
and wire brushing at 15 sqm / day : 6 helper for 92 sqm
For painting 1 coat primer and 3 coats
finishing paint at 15 sqm / day : 25 painter Cl-ll & 5 helper for 4 x 92 sqm
7. Excise duty on supply :
Excise duty is applicable on supply of fabricated parts. The cost of materials is inclusive of all
taxes/ duties. Therefore, for purpose of rate analysis 75 percent of total cost excluding the cost
of materials ( assuming 25 % erection cost ) is considered for assessing excise duty.
8. Use rate of materials :
Cost of welding set @ Rs: 3375.00 / Each Rs: 3375.00
Life of welding set : 1000 hours
Use rate of welding set per hour ( cost / life ) Rs: 3.38
Cost of gas cutting set @ Rs: 1125.00 / Each Rs: 1125
Life of gas cutting set : 600 hours
Use rate of gas cutting set per hr ( cost / life ) Rs: 1.88

RATE ANALYSIS UNIT : 9.202 tonne


A. MATERIALS:
Sl No Perticulars Unit Quantity Rate Amount
in Rs. in Rs.
1 Structural steel
Plates / flats kg 4479.00 24.00 107496.00
2 Cast iron components
CI blocks for counter wt kg 4100.00 18.00 73800.00
3 Alloy steel components
Wheel axles / Pins kg 132.00 175.00 23100.00
4 Cast steel components
Wheels / Guide rollers kg 492.00 85.00 41820.00
5 Alluminium / Bronze alloy components
Bearings / Bushes kg 76.00 380.00 28880.00

53
GATES AND HOISTS

6 Bolt / Nut / Washer


SS bolts / nuts / washers kg 55.00 100.00 5500.00
GI bolts / nuts / washers kg 76.00 60.00 4560.00
MS bolts / nuts / washers kg 4.00 45.00 180.00
7 Rubber seals
Bottom seal ( flat uncladed ) Rm 2.80 120.00 336.00
Side seals ( bulb teflon claded ) Rm 5.85 550.00 3217.50
Top seal ( bulb teflon claded ) Rm 2.25 550.00 1237.50
Corner seals ( bulb teflon claded ) Nos 2.00 600.00 1200.00
8 Oxygen gas cum 99.00 40.00 3960.00
9 Acetyline gas cum 33.00 185.00 6105.00
10 Welding electrodes Nos 282.00 4.00 1128.00
11 Welding electrodes ( LH ) Nos 2532.00 6.00 15192.00
12 Zinc rich epoxy primer ltr 10.00 525.00 5250.00
13 Coal tar epoxy paint ltr 46.00 131.00 6026.00
14 Rust cleaner / inhibitor ltr 12.00 175.00 2100.00
15 Use rate welding holder set Hour 300.00 3.38 1012.50
16 Use rate gas cutting torch set Hour 18.00 1.88 33.75
17 Wire brush Nos 1.00 25.00 25.00
18 Sundries LS 50.00 22.50 1125.00
TOTAL Rs: 333284.25
Add for small Tools and Plants @ 1% Rs: 3332.84
Add for Contractor' Profit @ 10% Rs: 33328.43
Add for Contrators' Overheads @ 5% Rs: 16664.21
Total cost of Materials Rs: 386609.73

B. MACHINERY:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Welding transformer Hour 300.00 9.00 2700.00
Fuel / Energy charges Hour 188.00 49.00 9212.00
2 Pug cutting machine Hour 48.00 13.00 624.00
Fuel / Energy charges Hour 48.00 2.00 96.00
3 Tower crane Hour 1.00 763.00 763.00
Fuel / Energy charges Hour 1.00 106.00 106.00
4 Mobile derric crane Hour 10.00 261.00 2610.00
Fuel / Energy charges Hour 10.00 117.00 1170.00
5 Stationery derric crane Hour 20.00 50.00 1000.00
Fuel / Energy charges Hour 20.00 5.00 100.00
6 Grinding machine Hour 8.00 15.00 120.00
Fuel / Energy charges Hour 8.00 20.00 160.00
7 Drilling machines Hour 16.00 15.00 240.00
Fuel / Energy charges Hour 16.00 20.00 320.00
8 Sundries LS 25.00 22.50 562.50
TOTAL Rs: 19783.50
Add for small Tools and Plants @ 1% Rs: 197.84
Add for Contractor' Profit on DPOL / Energy @ 10% Rs: 1172.65
Add for Contrators' Overheads @ 5% Rs: 989.18
Total hire charges of Machinery Rs: 22143.16

C. LABOUR:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Crew for Mobile crane Hour 10.00 32.90 329.00
2 Crew for Tower crane Hour 1.00 36.05 36.05

54
GATES AND HOISTS

3 Crew for Drilling machine Hour 16.00 35.00 560.00


4 Crew for Grinding machine Hour 8.00 35.00 280.00
5 Foreman Day 16.00 108.65 1738.40
6 Marker / Fabricator / Erector Day 25.00 93.70 2342.50
7 Gas cutter Day 8.00 93.70 749.60
8 Welder ( General ) Day 25.00 93.70 2342.50
9 Welder ( X - ray grade ) Day 3.00 103.07 309.21
10 Khalasi Day 10.00 83.65 836.50
11 Helper fabrication / erection Day 74.00 81.60 6038.40
12 Helper for cleaning / painting Day 11.00 81.60 897.60
13 Painter Cl - II Day 25.00 81.60 2040.00
14 Electrician Day 2.00 82.65 165.30
TOTAL Rs: 18665.06
Add for small Tools and Plants @ 1% Rs: 186.65
Add for Contractor' Profit @ 10% Rs: 1866.51
Add for hidden cost on Labour @ 15% Rs: 2799.76
Add for additional hidden cost on labour @ 10% Rs: 1866.51
Add for Contrators' Overheads @ 5% Rs: 933.25
Total cost of Labour Rs: 26317.73

ABSTRACT:
A. Cost of Materials Rs: 386609.73
B. Hire charges of Machinery Rs: 22143.16
C. Cost of Labour Rs: 26317.73
Total Rs: 435070.62
Add for excise duty on 75 percent cost
excluding cost of materials @ 18.00% Rs: 6542.22
Add for insurance charges @ 1.00% Rs: 4350.71
Add for designs and drawings @ 2.5% Rs: 10876.77
Add for zigs / supports / winches / chain-pulley @ 2.5% Rs: 10876.77
Add for power supply arrangements @ 2.5% Rs: 10876.77
Add for enabling works @ 2% Rs: 8701.41
Total Rs: 487295.26
Add for 2 rehandling leads for 1 km including loading and unloading :
Fabricated parts 2x9.202 tonnes @ Rs: 81.30 / tonne Rs: 1496.25
Add for transportation upto work site @ 3% Rs: 14618.86
Total cost for 9.202 tonne Rs: 503410.36
Rate per tonne Rs: 54710.00

SECTION: GATE / HOIST & ALLIED WORKS. YEAR: 2003-2004 ITEM No: 14

ITEM: Design, fabrication, supply, erection, testing and commissioning of adequate capacity rope
drum hoist consisting of hoist platform, rope drum, gear system, electric motor, electro-
magnetic brake system, hand operation assembly, control panel, wire rope, pulleys, ladder etc.,
with all accessories for operating river sluice / canal sluice service gate including cost of
all materials, machinery, labour, cutting, bending, aligning, anchoring, welding, finishing,
cleaning, applying two coats of zinc chromate red oxide primer and three coats of approved
synthetic enamel paint etc., complete with all leads and lifts.

DATA: Rope drum hoist for river / canal sluice service gate consists of embedded parts for anchorage,
hoist supporting structure, pulley support, pulleys, drive stool, rope drums, shafts, couplings,
gears and pinions, plummer blocks, gear box, electric motor, hand operation assembly, brake,
wire rope, gate position indicator, switch box etc. with related accessories.
Consider rope drum hoist for river / canal sluice service gate for vent of size 2.5 m x 3 m.
Details of material / Gas cutting / Welding considered for rate analysis are based on river sluice

55
GATES AND HOISTS

gate rope drum hoist drawings for 2.5 m x 3 m river sluice of Kodasalli dam.
Capacity of hoist in tonnes :
Weight of gate leaf in tonne for 2.5 m x 3 m sluice opening based on empirical formula :
Size of gate for 2.5 x 3 m opening : 3.2 m x 3.3 m
Head of water above sill level considered : 34 m
Generally the hoist capacity will be 2.5 times the weight of gate including weight of ballast.
Weight of gate in tonnes ( including weight of ballast ) = 0.0888 x ( L^2 x H x h )^0.659
Where ( L ) is length and ( H ) is height and ( h ) is head of water in metres.
= 0.0888 x ( 3.2^2 x 3.3 x 34 )^0.659 : 9.229
Capacity of hoist in tonnes with 25% reserve capacity : 2.5 x wt of gate with ballast
( Capacity of hoist to be rounded off to next 5 tonne ) : 2.50 x 9.229
: 23.073 tonnes
say : 25.00 tonnes
Weight of hoist with all accessories is assumed at 0.25 tonne per tonne capacity of hoist.
Weight of hoist with all accessories ( 0.25 x 25 ) : 6.25 tonnes
The actual weight of river sluice service gate rope drum hoist as per data sheet : 6.243 t
Consider actual weight for data rate analysis.
1. Requirement of materials : as per fabrication drawings ( for details refer Item : 14 of Annexer )
a. Structural steel conforming to IS : 2062 :
Angles / Beams / Channels / Bars with 2.5 % wastage : 1487.00 kg
Plates / Flats with 2.5 % wastage : 402.00 kg
Chequered plates with 2.5 % wastage : 290.00 kg
b. Cast steel components conforming to IS : 1030 :
Rope drums 2 Nos / Gears : 1926.00 kg
Pinions : 79.00 kg
Pulleys 3 Nos / Couplings 2 Nos : 306.00 kg
Plummer blocks / Hubs : 72.00 kg
c. Alloy steel steel components conforming to IS : 1570 :
Shafts : 346.00 kg
Pins 73.00 kg
d. Alluminium/ Bronze alloy components conforming to IS : 305 :
Bearings / Bush : 57.00 kg
e. Bolt / Nut / Washers conforming to IS : 1363 :
MS Bolts / Nuts / Washers with 2.5 % wastage : 32.00 kg
f. Steel wire rope conforming ti IS 2266 :
28 mm dia 6 / 37 construction 1 No 120 Rm @ 2.71 kg / m : 325 kg
g. Other components :
Manual operating system : 1 No.
Worm reducer : 1 No
Electric motor 5 hp : 1 No.
Gate position indicator : 1 No.
Ele-magnetic brake : 1 No.
Electric cable / switch / control panel etc : 1 set
h. Welding electrodes :
Welding electrodes for stitch welding at 10 % of total with 2.5 % wastage : 80 Nos
Welding electrodes ( LH ) for run welding at 90 % of total with 2.5 % wastage : 720 Nos
2. Cutting :
Length of cutting assuming cutting for 2 sides : 57 Rm
Add for variations ( cutting for more than 2 sides / odd shapes etc ) at 10 % : 6 Rm
Total : 63 Rm
For cutting structural steel sections to required sizes gas cutting is assumed.
Length of steel to be cut by using gas manually : 26 m
Length of steel to be cut by gas using pug cutting machine : 37 m
Time for gas cutting manually assuming average cutting progress of 2 m / hour : 13 hours

56
GATES AND HOISTS

Time for gas cutting by pug cutting machine at ( av ) 3 m / hour : 12 hours


Acetelyne gas @ 0.6 cum / hour ( 25 x 0.60 ) : 15 cum
Oxygen gas @ 1.8 cum / hour ( 25 x 1.80 ) : 45 cum
Use of gas cutting torch with 50 min / hr working ( 13 x 60 / 50 ) : 16 hours
Use of pug cutting machine with 50 min / hr working ( 12 x 60 / 50 ) : 15 hours
3. Welding :
Length of welding : 97 Rm
For stich welding @ 2 hrs usage / shift & @ 15 electrodes / hr
( 80 / 15 ) x 8 / 2 : 21 hours
For run welding @ 6 hrs usage / shift & @ 15 electrodes / hr
( 720 / 15 ) x 8 / 6 : 64 hours
Total : 85 hours
Deploy welding transformer for 85 hours.
Fuel / Energy charges @ 25 % hrs for stitch welding & @ 75 % hrs for run welding.
( 21 x 0.25 + 64 x 0.75 ) : 53 hours
4. Surface cleaning and painting :
Painting area for rope drum hoist at 20 sqm / tonne of str steel : 43 sqm
2 coats of zinc chromate red oxide primer.
Quantity of primer paint for 43 sqm @ 12 sqm / ltr / coat : 7 ltr
3 coats of synthetic enamel paint.
Quantity of synthetic enamel paint for 43 sqm @ 12 sqm / ltr /coat : 11 ltr
As surface cleaning by sand blasting is hazardous, it is proposed to adopt chemical treatment
to remove grease, rust, scaling etc., and to form phasphate coating to prevent further rusting
before applying primer painting.
Quantity of rust cleaner / inhibitor at 8 sqm / ltr : 5 ltr
5. Requirement of other machinery :
For lifting and placing in position hoist drums, worm reducers, gears, floating shafts etc deploy
tower crane for 2 hours.
For handling during fabrication and erection mobile derric crane for 10 hours considered.
For drilling holes for bolts 2 hours use of drilling machine considered.
For grinding and finishing weld joints 2 hours use of grinding machine considered.
6. Requirement of work force :
Work component Foreman Marker / Gas cutter / Helper
Fabricator / Welder
Erector
Cutting sections/ drilling holes 31 hours 2 4 4 8
Fabricating by stitch welding 21 hours 1 3 --- 6
Run welding 64 hours 1 --- 8 8
Erection of anchors 1 1 --- 2
Erection of hoist frame 1 1 --- 2
Erection of drums / gears / shafts 1 2 --- 4
Erection of pulleys / plummer blocks 1 1 --- 2
Erection of worm reducers / brake / motor 1 1 --- 2
Erection of other accessories 1 1 --- 2
Erection of control panel / cabling 1 1 --- 1
Checking and running without rope 1 1 --- 2
Rope fixing and checking 1 1 --- 2
Trial running by lowering / lifting gate 1 1 --- 2
Final checking / Finishing / cleaning 1 1 --- 1
Total : 15 19 12 44
Note : It is assumed that all stitch welding will be done by fabricator. Hence, no separate provision is
considered for welder for stitch welding.
For surface cleaning by chemical cleaner
and wire brushing at 15 sqm / day : 3 helpers for 43 sqm
For painting 2 coats primer and 3 coats

57
GATES AND HOISTS

finishing paint at 20 sqm / day : 11 painter Cl-ll & 2 helpers for 5 x 43 sqm
7. Excise duty on supply :
Excise duty is applicable on supply of fabricated parts. The cost of materials is inclusive of all
taxes/ duties. Therefore, for purpose of rate analysis 75 percent of total cost excluding the cost
of materials ( assuming 25 % erection cost ) is considered for assessing excise duty.
8. Use rate of materials :
Cost of welding set @ Rs: 3375.00 / Each Rs: 3375.00
Life of welding set : 1000 hours
Use rate of welding set per hour ( cost / life ) Rs: 3.38
Cost of gas cutting set @ Rs: 1125.00 / Each Rs: 1125
Life of gas cutting set : 600 hours
Use rate of gas cutting set per hr ( cost / life ) Rs: 1.88

RATE ANALYSIS UNIT : 6.243 tonne wt


A. MATERIALS: 25 t capacity
Sl No Perticulars Unit Quantity Rate Amount
in Rs. in Rs.
1 Structural steel
Angles / beams / channels / bars kg 1487.00 20.00 29740.00
Plates / flats kg 402.00 24.00 9648.00
Chequered plate kg 290.00 25.20 7308.00
2 Cast steel components :
Rope drums 2 Nos / Gears kg 1926.00 95.00 182970.00
Pinions kg 79.00 105.00 8295.00
Pulleys 3 Nos / Couplings 2 Nos kg 306.00 85.00 26010.00
Plummer blocks / Hubs kg 72.00 85.00 6120.00
3 Alloy steel components
Shafts kg 346.00 145.00 50170.00
Pins kg 73.00 175.00 12775.00
4 Bronze alloy components :
Bronze bearings / bush kg 57.00 380.00 21660.00
5 Wire rope 28 mm dia 6/37 construction kg 325.00 75.00 24375.00
6 MS Bolt / Nut / Washer kg 32.00 45.00 1440.00
7 Worm reducers No. 1.00 39375.00 39375.00
8 Electric motor 5 hp No. 1.00 11250.00 11250.00
9 Manual operating system No. 1.00 8437.50 8437.50
10 Gate position indicator No. 1.00 8437.50 8437.50
11 Ele-magnetic brake No. 1.00 8437.50 8437.50
12 Electric cable / switch / control panel etc LS 1.00 5625.00 5625.00
13 Oxygen gas cum 45.00 40.00 1800.00
14 Acetyline gas cum 15.00 185.00 2775.00
15 Welding electrodes Nos 80.00 4.00 320.00
16 Welding electrodes ( LH ) Nos 720.00 6.00 4320.00
17 Zinc chromate red oxide primer ltr 7.00 140.00 980.00
18 Synthetic enamel ( 1st quality ) paint ltr 11.00 140.00 1540.00
19 Rust cleaner / inhibitor ltr 5.00 175.00 875.00
20 Grease kg 50.00 90.00 4500.00
21 Use rate welding holder set Hour 85.00 3.38 286.88
22 Use rate gas cutting torch set Hour 16.00 1.88 30.00
23 Wire brush Nos 1.00 25.00 25.00
24 Sundries LS 25.00 22.50 562.50
TOTAL Rs: 480087.88
Add for small Tools and Plants @ 1% Rs: 4800.88

58
GATES AND HOISTS

Add for Contractor' Profit @ 10% Rs: 48008.79


Add for Contrators' Overheads @ 5% Rs: 24004.39
Total cost of Materials Rs: 556901.94

B. MACHINERY:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Welding transformer Hour 85.00 9.00 765.00
Fuel / Energy charges Hour 53.00 49.00 2597.00
2 Tower crane 5 t capacity Hour 2.00 763.00 1526.00
Fuel / Energy charges Hour 2.00 106.00 212.00
3 Pug cutting machine Hour 15.00 13.00 195.00
Fuel / Energy charges Hour 15.00 2.00 30.00
4 Mobile derric crane Hour 10.00 261.00 2610.00
Fuel / Energy charges Hour 10.00 117.00 1170.00
5 Grinding machine Hour 2.00 15.00 30.00
Fuel / Energy charges Hour 2.00 20.00 40.00
6 Drilling machines Hour 2.00 15.00 30.00
Fuel / Energy charges Hour 2.00 20.00 40.00
7 Sundries LS 25.00 22.50 562.50
TOTAL Rs: 9807.50
Add for small Tools and Plants @ 1% Rs: 98.08
Add for Contractor' Profit on DPOL / Energy @ 10% Rs: 465.15
Add for Contrators' Overheads @ 5% Rs: 490.38
Total hire charges of Machinery Rs: 10861.10

C. LABOUR:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Crew for Mobile crane Hour 10.00 32.90 329.00
2 Crew for Tower crane Hour 2.00 36.05 72.10
3 Crew for Drilling machine Hour 2.00 35.00 70.00
4 Crew for Grinding machine Hour 2.00 35.00 70.00
5 Foreman Day 15.00 108.65 1629.75
6 Marker / Fabricator / Erector Day 19.00 93.70 1780.30
7 Gas cutter Day 4.00 93.70 374.80
8 Welder ( General ) Day 8.00 93.70 749.60
9 Khalasi Day 4.00 83.65 334.60
10 Helper fabrication / erection Day 44.00 81.60 3590.40
11 Helper for cleaning / painting Day 5.00 81.60 408.00
12 Painter Cl - II Day 11.00 81.60 897.60
13 Electrician Day 2.00 82.65 165.30
TOTAL Rs: 10471.45
Add for small Tools and Plants @ 1% Rs: 104.71
Add for Contractor' Profit @ 10% Rs: 1047.15
Add for hidden cost on Labour @ 15% Rs: 1570.72
Add for additional hidden cost on labour @ 10% Rs: 1047.15
Add for Contrators' Overheads @ 5% Rs: 523.57
Total cost of Labour Rs: 14764.74

ABSTRACT:
A. Cost of Materials Rs: 556901.94
B. Hire charges of Machinery Rs: 10861.10
C. Cost of Labour Rs: 14764.74
Total Rs: 582527.78

59
GATES AND HOISTS

Add for excise duty on 75 percent cost


excluding cost of materials @ 18.00% Rs: 3459.49
Add for insurance charges @ 1.00% Rs: 5825.28
Add for designs and drawings @ 2.5% Rs: 14563.19
Add for zigs / supports / winches / chain-pulley @ 2.5% Rs: 14563.19
Add for power supply arrangements @ 2.5% Rs: 14563.19
Add for enabling works @ 2% Rs: 11650.56
Total Rs: 647152.69
Add for 2 rehandling leads for 1 km including loading and unloading :
Fabricated parts 2x6.243 tonnes @ Rs: 81.30 / tonne Rs: 1015.11
Add for transportation upto work site @ 3% Rs: 19414.58
Total cost for 6.243 tonne wt Rs: 667582.38
25.000 t capacity
Rate per tonne wt Rs: 106930.00
Rate per tonne capacity of hoist Rs: 26700.00

SECTION: GATE / HOIST & ALLIED WORKS. YEAR: 2003-2004 ITEM No: 15

ITEM: Design, fabrication, supply, erection and commissioning of embedded parts ( without groove
liners ) consisting of sill beam, wheel tracks, seal seats, guide rails, breast wall liner upto
1m height above the roof of vent etc., with all accessories for river / canal sluice emergency
gate including cost of all materials, machinery, labour, cutting, aligning, anchoring, welding,
finishing, cleaning, applying one coat of zinc rich epoxy primer and four coats of cold applied
coal tar epoxy paint etc., complete as per specifications and approved drawings with all leads
and lifts.

DATA: Embedded parts for river sluice emergency gate consist of sill beam, wheel / seal tracks, breast
wall lining upto 1 m height above vent top, gate guide etc., with all accessories such as f irst
stage anchors.
The weight of embedded parts depends on the height of gate groove, height upto which breast
wall lining is to be provided.
Weight of breast wall lining for 20 mm MS plate and 6 mm SS plate including stiffeners and
anchors will be about 250 kg per sqm area of breast wall.
Consider embedded parts for river sluice emergency gate for sluice opening of size 1.5 m x 3 m.
Details of material / Gas cutting / Welding considered for rate analysis are based on embedded
parts drawings for emergency gate for river sluice vent of Upper Tunga dam.
Generally wt of embedded parts for sluice gate will be 50% of wt of gate including ballast.
Weight of embedded parts in tonne for 1.5 m x 3 m opening based on empirical formula :
Size of gate for 1.5 m x 3 m opening : Length : 2.2 m Height : 3.3 m
Head of water considered above sill level : 16 m
Weight of embedded parts in tonnes = 0.0444 x ( L^2 x H x h )^0.659
Where ( L ) is length and ( H ) is height and ( h ) is head of water in metres.
= 0.0444 x ( 2.2 x 2.2 x 3.3 x 16 ) ^ 0.659 : 1.714 tonnes
Weight of breast wall lining about 2 sqm @ 250 kg / sqm : 0.500 tonnes
: 2.214 tonnes
The actual weight of embedded parts as per data sheet : 2.180 tonnes
Consider actual weight for data rate analysis.
1. Requirement of materials : as per fabrication drawings ( for details refer Item : 15 of Annexer )
a. Structural steel conforming to IS : 2062 :
Structural steel angles / beams / channels / bars with 2.5 % wastage : 608 kg
Structural steel plates / flats with 2.5 % wastage : 1337 kg
b. Alloy steel components conforming to IS : 1570 :
Stainless steel plates / flats : 225.00 kg
c. Bolt / Nut / Washer conforming ti IS : 1363 :
MS bolts and nuts with 2.5 % wastage : 66 kg

60
GATES AND HOISTS

d. Welding electrodes :
Welding electrodes for stitch welding at 10 % of total with 2.5 % wastage : 77 Nos
Welding electrodes (SS) for stitch welding at 10 % of total with 2.5 % wastage : 34 Nos
Welding electrodes ( LH ) for run welding at 90 % of total with 2.5 % wastage : 697 Nos
Welding electrodes ( SS ) for run welding at 90 % of total with 2.5 % wastage : 305 Nos
2. Cutting :
Length of cutting assuming cutting for 2 sides as per data sheet : 135 Rm
Add for variations ( cutting for more than 2 sides / odd shapes etc ) at 10 % : 14 Rm
Total length of cutting : 149 Rm
For cutting structural steel sections to required size gas cutting is assumed for cutting angles /
beams / channels / round bars. For plates / flats less than 12 mm in thickness plate shearing
machine and for the remaining sections pug cutting machine is considered.
Length of steel to be cut by using gas manually : 30 m
Length of steel to be cut by gas using pug cutting machine : 89 m
Length of steel to be cut by using shearing machine : 30 m
Time for gas cutting manually assuming average cutting progress of 2 m / hour : 15 hours
Time for gas cutting by pug cutting machine at ( av ) 3 m / hour : 30 hours
Time for cutting by shearing machine at av. 10 m / hr progress : 3 hours
Acetelyne gas @ 0.6 cum / hour ( 45 x 0.60 ) : 27 cum
Oxygen gas @ 1.8 cum / hour ( 45 x 1.80 ) : 81 cum
Use of gas cutting torch with 50 min / hr working ( 15 x 60 / 50 ) : 18 hours
Use of pug cutting machine with 50 min / hr working ( 30 x 60 / 50 ) : 36 hours
Use of shearing machine with 50 min / hr working ( 3 x 60 / 50 ) : 4 hours
3. Welding :
Length of welding as per data sheet : 143 m
For stich welding @ 2 hrs usage / shift & @ 15 electrodes / hr
( 77 + 34 ) x 8 / 15 / 2 : 30 hours
For run welding @ 6 hrs usage / shift & @ 15 electrodes / hr
( 697 + 305 ) x 8 / 15 / 6 : 89 hours
Total : 119 hours
Deploy welding transformer for 119 hours.
Fuel / Energy charges @ 25 % hrs for stitch welding & @ 75 % hrs for run welding.
( 30 x 0.25 + 89 x 0.75 ) : : 75 hours
4. Planing SS plates for wheel / seal tracks :
For surface finishing of SS plates for wheel / seal tracks planing machine is considered.
Length of SS plate for surface finishing by planing machine : 26 Rm
Length of planing at a time for 4 m stroke planing machine : 3 Rm
Time for planing 3 m length section with 50 min / hour working : 8 hours
Time for planing 26 m SS plates ( 26 x 8 / 3 ) : 72 hours
5. Surface cleaning and painting :
Painting area for embedded parts at 12 sqm / tonne : 26 sqm
1 coat of zinc rich epoxy primer 40 micron dry film each coat.
Quantity of primer paint for 26 sqm @ 9 sqm / ltr / coat : 3 ltr
4 coats of coal tar epoxy paint 100 micron dry film each coat.
Quantity of coal tar epoxy paint for 26 sqm @ 6 sqm / ltr / coat : 18 ltr
As surface cleaning by sand blasting is hazardous, it is proposed to adopt chemical treatment
to remove grease, rust, scaling etc., and to form phasphate coating to prevent further rusting
before applying primer painting.
Quantity of rust cleaner / inhibitor at 8 sqm / ltr : 4 ltr
6. Requirement of other machinery :
For drilling holes for anchor bolts use of drilling machine for 10 hours considered.
For grinding weld joints and edges requiring finishing use of grinding machine for 8 hours
considered.
For handling of parts during fabrication and erection mobile derric crane for 2 hours and
stationery derric crane for 4 hours considered.

61
GATES AND HOISTS

7. Requirement of work force :


Work component Foreman Marker / Gas cutter / Helper
Fabricator / Welder
Erector
Cutting sections 58 hours 3 7 7 14
Drilling holes for anchors / supports 1 1 1
Fbricating by stitch welding 30 hours 2 4 8
Run welding 89 hours 1 11 11
Erection of first stage anchors 2 4 8
Erection of Sill beam / Tracks / Guide 2 4 8
Erection of Breast wall 1 2 4
Finishing / cleaning 1 1 2
Total : 13 23 18 56
Note : It is assumed that all stitch welding will be done by fabricator. Hence, no separate provision is
considered for welder for stitch welding.
For surface cleaning by chemical cleaner
and wire brushing at 15 sqm / day : 2 helper for 26 sqm
For painting 1 coat primer and 4 coats
finishing paint at 15 sqm / day : 9 painter Cl-ll & 1 helper for 5 x 26 sqm
8. Excise duty on supply :
Excise duty is applicable on supply of fabricated parts. The cost of materials is inclusive of all
taxes/ duties. Therefore, for purpose of rate analysis 75 percent of total cost excluding the cost
of materials ( assuming 25 % erection cost ) is considered for assessing excise duty.
9. Use rate of materials :
Cost of welding set @ Rs: 3375.00 / Each Rs: 3375.00
Life of welding set : 1000 hours
Use rate of welding set per hour ( cost / life ) Rs: 3.38
Cost of gas cutting set @ Rs: 1125.00 / Each Rs: 1125
Life of gas cutting set : 600 hours
Use rate of gas cutting set per hr ( cost / life ) Rs: 1.88

RATE ANALYSIS UNIT : 2.180 tonne


A. MATERIALS:
Sl No Perticulars Unit Quantity Rate Amount
in Rs. in Rs.
1 Str steel angle / beam / channel / bars kg 608.00 20.00 12160.00
2 Structural steel plate / flats kg 1337.00 24.00 32088.00
3 Stainless steel plate / flats kg 225.00 90.00 20250.00
4 MS bolts and nuts kg 66.00 45.00 2970.00
5 Oxygen gas cum 81.00 40.00 3240.00
6 Acetyline gas cum 27.00 185.00 4995.00
7 Welding electrodes Nos 77.00 4.00 308.00
8 Welding electrodes ( LH ) Nos 697.00 6.00 4182.00
9 Welding electrodes ( stainless steel ) Nos 339.00 35.00 11865.00
10 Zinc rich epoxy primer ltr 3.00 525.00 1575.00
11 Coal tar epoxy paint ltr 18.00 131.00 2358.00
12 Rust cleaner / inhibitor ltr 4.00 175.00 700.00
13 Use rate welding holder set Hour 119.00 3.38 401.63
14 Use rate gas cutting torch set Hour 18.00 1.88 33.75
15 Wire brush Nos 1.00 25.00 25.00
16 Sundries LS 10.00 22.50 225.00
TOTAL Rs: 97376.38
Add for small Tools and Plants @ 1% Rs: 973.76

62
GATES AND HOISTS

Add for Contractor' Profit @ 10% Rs: 9737.64


Add for Contrators' Overheads @ 5% Rs: 4868.82
Total cost of Materials Rs: 112956.60

B. MACHINERY:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Welding transformer Hour 119.00 9.00 1071.00
Fuel / Energy charges Hour 75.00 49.00 3675.00
2 Plate shearing machine Hour 4.00 47.00 188.00
Fuel / Energy charges Hour 4.00 82.00 328.00
3 Pug cutting machine Hour 36.00 13.00 468.00
Fuel / Energy charges Hour 36.00 2.00 72.00
4 Planing machine Hour 72.00 66.00 4752.00
Fuel / Energy charges Hour 72.00 61.00 4392.00
5 Mobile derric crane Hour 2.00 261.00 522.00
Fuel / Energy charges Hour 2.00 117.00 234.00
6 Stationery derric crane Hour 4.00 50.00 200.00
Fuel / Energy charges Hour 4.00 5.00 20.00
7 Grinding machine Hour 8.00 15.00 120.00
Fuel / Energy charges Hour 8.00 20.00 160.00
8 Drilling machines Hour 10.00 15.00 150.00
Fuel / Energy charges Hour 10.00 20.00 200.00
9 Sundries LS 10.00 22.50 225.00
TOTAL Rs: 16777.00
Add for small Tools and Plants @ 1% Rs: 167.77
Add for Contractor' Profit on DPOL / Energy @ 10% Rs: 930.60
Add for Contrators' Overheads @ 5% Rs: 838.85
Total hire charges of Machinery Rs: 18714.22

C. LABOUR:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Crew for Mobile crane Hour 2.00 32.90 65.80
2 Crew for Planing machine Hour 72.00 42.75 3078.00
3 Crew for Drilling machine Hour 10.00 35.00 350.00
4 Crew for Grinding machine Hour 8.00 35.00 280.00
5 Foreman Day 13.00 108.65 1412.45
6 Marker / Fabricator / Erector Day 23.00 93.70 2155.10
7 Gas cutter Day 7.00 93.70 655.90
8 Welder ( General ) Day 8.00 93.70 749.60
9 Welder ( X - ray ) Day 3.00 103.07 309.21
10 Helper fabrication / erection Day 56.00 81.60 4569.60
11 Helper for cleaning / painting Day 3.00 81.60 244.80
12 Painter Cl - II Day 9.00 81.60 734.40
13 Electrician Day 1.00 82.65 82.65
TOTAL Rs: 14687.51
Add for small Tools and Plants @ 1% Rs: 146.88
Add for Contractor' Profit @ 10% Rs: 1468.75
Add for hidden cost on Labour @ 15% Rs: 2203.13
Add for additional hidden cost on labour @ 10% Rs: 1468.75
Add for Contrators' Overheads @ 5% Rs: 734.38
Total cost of Labour Rs: 20709.39

63
GATES AND HOISTS

ABSTRACT:
A. Cost of Materials Rs: 112956.60
B. Hire charges of Machinery Rs: 18714.22
C. Cost of Labour Rs: 20709.39
Total Rs: 152380.20
Add for excise duty on 75 percent cost
excluding cost of materials @ 18.00% Rs: 5322.19
Add for insurance charges @ 1.00% Rs: 1523.80
Add for designs and drawings @ 2.5% Rs: 3809.51
Add for zigs / supports / winches / chain-pulley @ 2.5% Rs: 3809.51
Add for power supply arrangements @ 2.5% Rs: 3809.51
Add for enabling works @ 2% Rs: 3047.60
Total Rs: 173702.31
Add for 2 rehandling leads for 1 km including loading and unloading :
Fabricated parts 2x2.180 tonnes @ Rs: 81.30 / tonne Rs: 354.47
Add for transportation upto work site @ 3% Rs: 5211.07
Total cost for 2.180 tonne Rs: 179267.85
Rate per tonne Rs: 82230.00

SECTION: GATE / HOIST & ALLIED WORKS. YEAR: 2003-2004 ITEM No: 16

ITEM: Design, fabrication, supply, erection and commissioning of embedded parts ( with groove
liner ) consisting of sill beam, wheel tracks, seal seats, guide rails, breast wall liner ( upto
1 m above the roof of vent ), groove liner upto breast wall level etc., with all accessories for
river / canal sluice emergency gate including cost of all materials, machinery, labour,
aligning, anchoring, welding, finishing, cleaning, applying one coat of zinc rich epoxy primer
and four coats of cold applied coal tar epoxy paint etc., complete as per specifications and
approved drawings with all leads and lifts.

DATA: Embedded parts for river sluice emergency gate consist of sill beam, wheel /seal tracks, groove
lining upto breast wall level, breast wall lining upto 1 m above top of vent, gate guide etc., with
all accessories such as first stage anchors.
The weight of embedded parts depends on the height of gate groove and height upto which
breast wall lining is to be provided.
Weight of breast wall lining for 20 mm MS plate and 6 mm SS plate including stiffeners and
anchors will be about 250 kg per sqm area of breast wall.
Weight of groove liner for 20 mm MS plate including stiffeners and anchors will be about
200 kg / sqm area of groove liner.
Consider embedded parts for river sluice emergency gate for sluice opening of size 2.5 m x 3 m.
Details of material / Gas cutting / Welding considered for rate analysis are based on embedded
parts drawings including groove liner for river sluice service gate of Kodasalli dam.
Weight of embedded parts for emergency gate will be about 65 to 70 % of gate wt with ballast.
Weight of embedded parts in tonne for 2.5 m x 3 m opening based on empirical formula :
Size of gate for 2.5 m x 3 m opening : Length : 3.2 m Height : 3.3 m
Head of water considered above sill level : 34 m
Weight of embedded parts in tonnes = 0.0600 x ( L^2 x H x h )^0.659
Where ( L ) is length and ( H ) is height and ( h ) is head of water in metres.
= 0.0600 x ( 3.2 x 3.2 x 3.3 x 34 ) ^ 0.659 : 6.236 tonnes
Weight of breast wall lining about 3.5 sqm @ 250 kg / sqm : 0.875 tonnes
Weight of groove liner about 10 sqm @ 200 kg / sqm : 2.000 tonnes
: 9.111 tonnes
The actual weight of embedded parts as per data sheet : 9.088 tonnes
Consider actual weight for data rate analysis.
1. Requirement of materials : as per fabrication drawings ( for details refer Item : 16 of Annexer )
a. Structural steel conforming to IS : 2062 :

64
GATES AND HOISTS

Structural steel angles / beams / channels / bars with 2.5 % wastage : 1017 kg
Structural steel plates / flats with 2.5 % wastage : 7617 kg
b. Alloy steel components conforming to IS : 1570 :
Stainless steel plates / flats : 442 kg
c. Bolt / Nut / Washer conforming ti IS : 1363 :
MS bolts and nuts with 2.5 % wastage : 240 kg
d. Welding electrodes :
Welding electrodes for stitch welding at 10 % of total with 2.5 % wastage : 416 Nos
Welding electrodes (SS) for stitch welding at 10 % of total with 2.5 % wastage : 59 Nos
Welding electrodes ( LH ) for run welding at 90 % of total with 2.5 % wastage : 3746 Nos
Welding electrodes ( SS ) for run welding at 90 % of total with 2.5 % wastage : 529 Nos
2. Cutting :
Length of cutting assuming cutting for 2 sides as per data sheet : 301 Rm
Add for variations ( cutting for more than 2 sides / odd shapes etc ) at 10 % : 30 Rm
Total length of cutting : 331 Rm
For cutting structural steel sections to required size gas cutting is assumed for cutting angles /
beams / channels / round bars. For plates / flats less than 12 mm in thickness plate shearing
machine and for the remaining sections pug cutting machine is considered.
Length of steel to be cut by using gas manually : 60 m
Length of steel to be cut by gas using pug cutting machine : 211 m
Length of steel to be cut by using shearing machine : 60 m
Time for gas cutting manually assuming average cutting progress of 2 m / hour 30 hours
Time for gas cutting by pug cutting machine at ( av ) 3 m / hour : 70 hours
Time for cutting by shearing machine at av. 10 m / hr progress : 6 hours
Acetelyne gas @ 0.6 cum / hour ( 100 x 0.60 ) : 60 cum
Oxygen gas @ 1.8 cum / hour ( 100 x 1.80 ) : 180 cum
Use of gas cutting torch with 50 min / hr working ( 30 x 60 / 50 ) 36 hours
Use of pug cutting machine with 50 min / hr working ( 70 x 60 / 50 ) 84 hours
Use of shearing machine with 50 min / hr working ( 6 x 60 / 50 ) 7 hours
3. Welding :
Length of welding as per data sheet : 560 m
For stich welding @ 2 hrs usage / shift & @ 15 electrodes / hr
( 416 + 59 ) x 8 / 15 / 2 : 127 hours
For run welding @ 6 hrs usage / shift & @ 15 electrodes / hr
( 3746 + 529 ) x 8 / 15 / 6 : 380 hours
Total : 507 hours
Deploy welding transformer for 507 hours.
Fuel / Energy charges @ 25 % hrs for stitch welding & @ 75 % hrs for run welding.
( 127 x 0.25 + 380 x 0.75 ) : 317 hours
4. Planing SS plates for wheel / seal tracks :
For surface finishing of SS plates for wheel / seal tracks planing machine is considered.
Length of SS plate for surface finishing by planing machine : 26 Rm
Length of planing at a time for 4 m stroke planing machine : 3 Rm
Time for planing 3 m length section with 50 min / hour working : 8 hours
Time for planing 26 m SS plates ( 26 x 8 / 3 ) : 69 hours
5. Surface cleaning and painting :
Painting area for embedded parts at 10 sqm / tonne : 91 sqm
1 coat of zinc rich epoxy primer 40 micron dry film each coat.
Quantity of primer paint for 91 sqm @ 9 sqm / ltr / coat : 10 ltr
4 coats of coal tar epoxy paint 100 micron dry film each coat.
Quantity of coal tar epoxy paint for 91 sqm @ 6 sqm / ltr / coat : 61 ltr
As surface cleaning by sand blasting is hazardous, it is proposed to adopt chemical treatment
to remove grease, rust, scaling etc., and to form phasphate coating to prevent further rusting
before applying primer painting.
Quantity of rust cleaner / inhibitor at 8 sqm / ltr : 12 ltr

65
GATES AND HOISTS

6. Requirement of other machinery :


For drilling holes for anchor bolts use of drilling machine for 50 hours considered.
For grinding weld joints and edges requiring finishing use of grinding machine for 25 hours
considered.
For handling of parts during fabrication and erection mobile derric crane for 20 hours and
stationery derric crane for 40 hours considered.
7. Requirement of work force :
Work component Foreman Marker / Gas cutter / Helper
Fabricator / Welder
Erector
Cutting sections 127 hours 8 16 16 32
Drilling holes for anchors / supports 3 6 --- 6
Fbricating by stitch welding 127 hours 8 16 --- 32
Run welding 380 hours 5 --- 48 48
Erection of first stage anchors 5 10 --- 10
Erection of Sill beam / Tracks / Guide 2 4 --- 8
Erection of Breast wall liner 1 2 --- 4
Erection of groove liners 3 6 --- 12
Finishing / cleaning 1 2 --- 4
Total : 36 62 64 156
Note : It is assumed that all stitch welding will be done by fabricator. Hence, no separate provision is
considered for welder for stitch welding.
For surface cleaning by chemical cleaner
and wire brushing at 15 sqm / day : 6 helper for 91 sqm
For painting 1 coat primer and 4 coats
finishing paint at 15 sqm / day : 30 painter Cl-ll & 6 helper for 5 x 91 sqm
8. Excise duty on supply :
Excise duty is applicable on supply of fabricated parts. The cost of materials is inclusive of all
taxes/ duties. Therefore, for purpose of rate analysis 75 percent of total cost excluding the cost
of materials ( assuming 25 % erection cost ) is considered for assessing excise duty.
9. Use rate of materials :
Cost of welding set @ Rs: 3375.00 / Each Rs: 3375.00
Life of welding set : 1000 hours
Use rate of welding set per hour ( cost / life ) Rs: 3.38
Cost of gas cutting set @ Rs: 1125.00 / Each Rs: 1125
Life of gas cutting set : 600 hours
Use rate of gas cutting set per hr ( cost / life ) Rs: 1.88

RATE ANALYSIS UNIT : 9.088 tonne


A. MATERIALS:
Sl No Perticulars Unit Quantity Rate Amount
in Rs. in Rs.
1 Str steel angle / beam / channel / bars kg 1017.00 20.00 20340.00
2 Structural steel plate / flats kg 7617.00 24.00 182808.00
3 Stainless steel plate / flats kg 442.00 90.00 39780.00
4 MS bolts and nuts kg 240.00 45.00 10800.00
5 Oxygen gas cum 180.00 40.00 7200.00
6 Acetyline gas cum 60.00 185.00 11100.00
7 Welding electrodes Nos 416.00 4.00 1664.00
8 Welding electrodes ( LH ) Nos 3746.00 6.00 22476.00
9 Welding electrodes ( stainless steel ) Nos 588.00 35.00 20580.00
10 Zinc rich epoxy primer ltr 10.00 525.00 5250.00
11 Coal tar epoxy paint ltr 61.00 131.00 7991.00
12 Rust cleaner / inhibitor ltr 12.00 175.00 2100.00
13 Use rate welding holder set Hour 507.00 3.38 1711.13

66
GATES AND HOISTS

14 Use rate gas cutting torch set Hour 36.00 1.88 67.50
15 Wire brush Nos 2.00 25.00 50.00
16 Sundries LS 20.00 22.50 450.00
TOTAL Rs: 334367.63
Add for small Tools and Plants @ 1% Rs: 3343.68
Add for Contractor' Profit @ 10% Rs: 33436.76
Add for Contrators' Overheads @ 5% Rs: 16718.38
Total cost of Materials Rs: 387866.45

B. MACHINERY:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Welding transformer Hour 507.00 9.00 4563.00
Fuel / Energy charges Hour 317.00 49.00 15533.00
2 Plate shearing machine Hour 7.00 47.00 329.00
Fuel / Energy charges Hour 7.00 82.00 574.00
3 Pug cutting machine Hour 84.00 13.00 1092.00
Fuel / Energy charges Hour 84.00 2.00 168.00
4 Planing machine Hour 69.00 66.00 4554.00
Fuel / Energy charges Hour 69.00 61.00 4209.00
5 Mobile derric crane Hour 20.00 261.00 5220.00
Fuel / Energy charges Hour 20.00 117.00 2340.00
6 Stationery derric crane Hour 40.00 50.00 2000.00
Fuel / Energy charges Hour 40.00 5.00 200.00
7 Grinding machine Hour 25.00 15.00 375.00
Fuel / Energy charges Hour 25.00 20.00 500.00
8 Drilling machines Hour 50.00 15.00 750.00
Fuel / Energy charges Hour 50.00 20.00 1000.00
9 Sundries LS 20.00 22.50 450.00
TOTAL Rs: 43857.00
Add for small Tools and Plants @ 1% Rs: 438.57
Add for Contractor' Profit on DPOL / Energy @ 10% Rs: 2497.40
Add for Contrators' Overheads @ 5% Rs: 2192.85
Total hire charges of Machinery Rs: 48985.82

C. LABOUR:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Crew for Mobile crane Hour 20.00 32.90 658.00
2 Crew for Shearing machine Hour 7.00 26.70 186.90
3 Crew for Planing machine Hour 69.00 42.75 2949.75
4 Crew for Drilling machine Hour 50.00 35.00 1750.00
5 Crew for Grinding machine Hour 25.00 35.00 875.00
6 Foreman Day 36.00 108.65 3911.40
7 Marker / Fabricator / Erector Day 62.00 93.70 5809.40
8 Gas cutter Day 16.00 93.70 1499.20
9 Welder ( General ) Day 42.00 93.70 3935.40
10 Welder ( X - ray ) Day 6.00 103.07 618.42
11 Helper fabrication / erection Day 156.00 81.60 12729.60
12 Helper for cleaning / painting Day 12.00 81.60 979.20
13 Painter Cl - II Day 30.00 81.60 2448.00
14 Electrician Day 2.00 82.65 165.30
TOTAL Rs: 38515.57
Add for small Tools and Plants @ 1% Rs: 385.16
Add for Contractor' Profit @ 10% Rs: 3851.56

67
GATES AND HOISTS

Add for hidden cost on Labour @ 15% Rs: 5777.34


Add for additional hidden cost on labour @ 10% Rs: 3851.56
Add for Contrators' Overheads @ 5% Rs: 1925.78
Total cost of Labour Rs: 54306.95

ABSTRACT:
A. Cost of Materials Rs: 387866.45
B. Hire charges of Machinery Rs: 48985.82
C. Cost of Labour Rs: 54306.95
Total Rs: 491159.22
Add for excise duty on 75 percent cost
excluding cost of materials @ 18.00% Rs: 13944.52
Add for insurance charges @ 1.00% Rs: 4911.59
Add for designs and drawings @ 2.5% Rs: 12278.98
Add for zigs / supports / winches / chain-pulley @ 2.5% Rs: 12278.98
Add for power supply arrangements @ 2.5% Rs: 12278.98
Add for enabling works @ 2% Rs: 9823.18
Total Rs: 556675.46
Add for 2 rehandling leads for 1 km including loading and unloading :
Fabricated parts 2x9.088 tonnes @ Rs: 81.30 / tonne Rs: 1477.71
Add for transportation upto work site @ 3% Rs: 16700.26
Total cost for 9.088 tonne Rs: 574853.43
Rate per tonne Rs: 63250.00

SECTION: GATE / HOIST & ALLIED WORKS. YEAR: 2003-2004 ITEM No: 17

ITEM: Design, fabrication, supply, erection, testing and commissioning of fixed wheel type vertical lift
emergency gate consisting of skin plate, horizontal and vertical girders, wheels, stiffeners,
lifting brackets, guide rollers, ballast blocks, teflon claded rubber seals etc., with all accessories
for river sluice / canal sluice vent including cost of all materials, machinery, labour, cutting,
aligning, welding, finishing, cleaning, applying one coat of zinc rich epoxy primer and three
coats of cold applied coal tar epoxy paint, seal fixing etc., complete as per specifications
and approved drawings with all leads and lifts.

DATA: Consider upstream seal vertical lift roller gate. The gate leaf consists of skin plate, horizontal
girders, vertical end girders, stiffeners, wheels, gate guide rollers, brackets for hooks, seals
etc., with all accessories.
Consider river / canal sluice emergency gate for 2.5 m x 3 m sluice opening for analysis.
Details of material / Gas cutting / Welding considered for rate analysis are based on emergency
gate drawings for river sluice vent of Kodasalli dam.
Weight of gate leaf in tonne for vertical lift gate based on empirical formula :
Weight in tonnes ( including weight of ballast ) = 0.0888 ( L^2 x H x h )^0.659
Where ( L ) is length and ( H ) is height of gate and ( h ) is head of water above sill in Rm.
For vent opening of 2.5 x 3.0 m the approximate size of gate leaf will be : 3.2 m x 3.3 m
Head of water above sill level considered : 34 m
Weight in tonnes = 0.0888 ( 3.2 x 3.2 x 3.3 x 34 ) ^ 0.659 : 9.229
The actual weight of river sluice emergency gate as per data sheet : 9.215 tonnes
Consider actual weight for data rate analysis.
1. Requirement of materials : as per fabrication drawings ( for details refer Item : 17 of Annexer )
a. Structural steel conforming to IS : 2062 :
Structural steel plates / flats with 2.5 % wastage : 4409 kg
b. Cast iron components conforming to IS : 210 :
Cast iron blocks for counter weight : 4100 kg
c. Alloy steel components conforming to IS : 1570 :
Wheel axles / Pins : 144 kg

68
GATES AND HOISTS

d. Cast steel components conforming to IS : 1030 :


Wheels / guide rollers : 492 kg
e. Alluminium / Bronze alloy components conforming to IS : 305 :
Bearings / Bushes : 76 kg
f. Bolts / Nuts / Washers conforming to IS : 1363 :
SS bolts / nuts / washers with 2.5 % wastage : 55 kg
GI bolts / nuts / washers with 2.5 % wastage : 148 kg
MS bolts / nuts / washers with 2.5 % wastage : 4 kg
g. Rubber seal conforming to IS : 11855 :
Bottom seal ( flat uncladed ) : 2.8 Rm
Top seal ( bulb type teflon claded ) : 2.25 Rm
Side seals ( bulb type teflon claded ) : 5.85 Rm
Corner seal ( bulb teflon claded ) : 2 Nos
h. Welding electrodes :
Welding electrodes for stitch welding at 10 % of total with 2.5 % wastage : 256 Nos
Welding electrodes ( LH ) for run welding at 90 % of total with 2.5 % wastage : 2308 Nos
2. Cutting :
Length of cutting assuming cutting for 2 sides : 134 Rm
Add for variations ( cutting for more than 2 sides / odd shapes etc ) at 10 % : 14 Rm
Total : 148 Rm
For cutting structural steel sections to required sizes gas cutting is assumed since most of the
sections are above 10 mm thick.
Length of steel to be cut by using gas manually : 30 m
Length of steel to be cut by gas using pug cutting machine : 118 m
Time for gas cutting manually assuming average cutting progress of 2 m / hour : 15 hours
Time for gas cutting by pug cutting machine at ( av ) 3 m / hour : 39 hours
Acetelyne gas @ 0.6 cum / hour ( 54 x 0.60 ) : 32 cum
Oxygen gas @ 1.8 cum / hour ( 54 x 1.80 ) : 96 cum
Use of gas cutting torch with 50 min / hr working ( 15 x 60 / 50 ) : 18 hours
Use of pug cutting machine with 50 min / hr working ( 39 x 60 / 50 ) : 47 hours
3. Welding :
Length of welding : 271 Rm
For stich welding @ 2 hrs usage / shift & @ 15 electrodes / hr
( 256 / 15 ) x 8 / 2 : 68 hours
For run welding @ 6 hrs usage / shift & @ 15 electrodes / hr
( 2308 / 15 ) x 8 / 6 : 205 hours
Total : 273 hours
Deploy welding transformer for 273 hours.
Fuel / Energy charges @ 25 % hrs for stitch welding & @ 75 % hrs for run welding.
( 68 x 0.25 + 205 x 0.75 ) : 171 hours
4. Surface cleaning and painting :
Painting area for river sluice gate at 10 sqm / tonne : 92 sqm
1 coat of zinc rich epoxy primer 40 micron dry film each coat.
Quantity of primer paint for 92 sqm @ 9 sqm / ltr / coat : 10 ltr
3 coats of coal tar epoxy paint 100 micron dry film each coat.
Quantity of coal tar epoxy paint for 92 sqm @ 6 sqm / ltr / coat : 46 ltr
As surface cleaning by sand blasting is hazardous, it is proposed to adopt chemical treatment
to remove grease, rust, scaling etc., and to form phasphate coating to prevent further rusting
before applying primer painting.
Quantity of rust cleaner / inhibitor at 8 sqm / ltr : 12 ltr
5. Requirement of other machinery :
For lowering gate leaf from hoist chamber use of tower crane for 1 hour considered.
For handling of gate parts during fabrication and erection mobile derric crane for 10 hours and
stationery derric crane for 20 hours considered.
For drilling holes in skin plate, counter weight blocks, horizontal girders and seal clamps use of

69
GATES AND HOISTS

drilling machine for 16 hours considered.


For grinding and finishing weld joints in skin plate and other locations 8 hours use of grinding
machine considered.
6. Requirement of work force :
Work component Foreman Marker / Gas cutter / Helper
Fabricator / Welder
Erector
Cutting sections 65 hours 4 8 8 16
Drilling holes for seal fixing 1 2 --- 2
Fabricating by stitch welding 68 hours 5 9 --- 18
Run welding 205 hours 3 --- 26 26
Fixing counter weight blocks 1 1 --- 2
Seal fixing 1 1 --- 2
Guide roller fixing / Cleaning / Lowering 1 2 --- 2
Total : 16 23 34 68
Note : It is assumed that all stitch welding will be done by fabricator. Hence, no separate provision is
considered for welder for stitch welding.
For surface cleaning by chemical cleaner
and wire brushing at 15 sqm / day : 6 helper for 92 sqm
For painting 1 coat primer and 3 coats
finishing paint at 15 sqm / day : 25 painter Cl-ll & 5 helper for 4 x 92 sqm
7. Excise duty on supply :
Excise duty is applicable on supply of fabricated parts. The cost of materials is inclusive of all
taxes/ duties. Therefore, for purpose of rate analysis 75 percent of total cost excluding the cost
of materials ( assuming 25 % erection cost ) is considered for assessing excise duty.
8. Use rate of materials :
Cost of welding set @ Rs: 3375.00 / Each Rs: 3375.00
Life of welding set : 1000 hours
Use rate of welding set per hour ( cost / life ) Rs: 3.38
Cost of gas cutting set @ Rs: 1125.00 / Each Rs: 1125
Life of gas cutting set : 600 hours
Use rate of gas cutting set per hr ( cost / life ) Rs: 1.88

RATE ANALYSIS UNIT : 9.215 tonne


A. MATERIALS:
Sl No Perticulars Unit Quantity Rate Amount
in Rs. in Rs.
1 Structural steel
Plates / flats kg 4409.00 24.00 105816.00
2 Cast iron components
CI blocks for counter wt kg 4100.00 18.00 73800.00
3 Alloy steel components
Wheel axles / Pins kg 144.00 175.00 25200.00
4 Cast steel components
Wheels / Guide rollers kg 492.00 85.00 41820.00
5 Alluminium / Bronze alloy components
Bearings / Bushes kg 76.00 380.00 28880.00
6 Bolt / Nut / Washer
SS bolts / nuts / washers kg 55.00 100.00 5500.00
GI bolts / nuts / washers kg 148.00 60.00 8880.00
MS bolts / nuts / washers kg 4.00 45.00 180.00
7 Rubber seals
Bottom seal ( flat uncladed ) Rm 2.80 120.00 336.00
Side seals ( bulb teflon claded ) Rm 5.85 550.00 3217.50
Top seal ( bulb teflon claded ) Rm 2.25 550.00 1237.50

70
GATES AND HOISTS

Corner seals ( bulb teflon claded ) Nos 2.00 600.00 1200.00


8 Oxygen gas cum 96.00 40.00 3840.00
9 Acetyline gas cum 32.00 185.00 5920.00
10 Welding electrodes Nos 256.00 4.00 1024.00
11 Welding electrodes ( LH ) Nos 2308.00 6.00 13848.00
12 Zinc rich epoxy primer ltr 10.00 525.00 5250.00
13 Coal tar epoxy paint ltr 46.00 131.00 6026.00
14 Rust cleaner / inhibitor ltr 12.00 175.00 2100.00
15 Use rate welding holder set Hour 273.00 3.38 921.38
16 Use rate gas cutting torch set Hour 18.00 1.88 33.75
17 Wire brush Nos 1.00 25.00 25.00
18 Sundries LS 50.00 22.50 1125.00
TOTAL Rs: 336180.13
Add for small Tools and Plants @ 1% Rs: 3361.80
Add for Contractor' Profit @ 10% Rs: 33618.01
Add for Contrators' Overheads @ 5% Rs: 16809.01
Total cost of Materials Rs: 389968.95

B. MACHINERY:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Welding transformer Hour 273.00 9.00 2457.00
Fuel / Energy charges Hour 171.00 49.00 8379.00
2 Pug cutting machine Hour 47.00 13.00 611.00
Fuel / Energy charges Hour 47.00 2.00 94.00
3 Tower crane Hour 1.00 763.00 763.00
Fuel / Energy charges Hour 1.00 106.00 106.00
4 Mobile derric crane Hour 10.00 261.00 2610.00
Fuel / Energy charges Hour 10.00 117.00 1170.00
5 Stationery derric crane Hour 20.00 50.00 1000.00
Fuel / Energy charges Hour 20.00 5.00 100.00
6 Grinding machine Hour 8.00 15.00 120.00
Fuel / Energy charges Hour 8.00 20.00 160.00
7 Drilling machines Hour 16.00 15.00 240.00
Fuel / Energy charges Hour 16.00 20.00 320.00
8 Sundries LS 25.00 22.50 562.50
TOTAL Rs: 18692.50
Add for small Tools and Plants @ 1% Rs: 186.93
Add for Contractor' Profit on DPOL / Energy @ 10% Rs: 1089.15
Add for Contrators' Overheads @ 5% Rs: 934.63
Total hire charges of Machinery Rs: 20903.20

C. LABOUR:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Crew for Mobile crane Hour 10.00 32.90 329.00
2 Crew for Tower crane Hour 1.00 36.05 36.05
3 Crew for Drilling machine Hour 16.00 35.00 560.00
4 Crew for Grinding machine Hour 8.00 35.00 280.00
5 Foreman Day 16.00 108.65 1738.40
6 Marker / Fabricator / Erector Day 23.00 93.70 2155.10
7 Gas cutter Day 8.00 93.70 749.60
8 Welder ( General ) Day 23.00 93.70 2155.10
9 Welder ( X - ray grade ) Day 3.00 103.07 309.21
10 Khalasi Day 10.00 83.65 836.50

71
GATES AND HOISTS

11 Helper fabrication / erection Day 68.00 81.60 5548.80


12 Helper for cleaning / painting Day 11.00 81.60 897.60
13 Painter Cl - II Day 25.00 81.60 2040.00
14 Electrician Day 2.00 82.65 165.30
TOTAL Rs: 17800.66
Add for small Tools and Plants @ 1% Rs: 178.01
Add for Contractor' Profit @ 10% Rs: 1780.07
Add for hidden cost on Labour @ 15% Rs: 2670.10
Add for additional hidden cost on labour @ 10% Rs: 1780.07
Add for Contrators' Overheads @ 5% Rs: 890.03
Total cost of Labour Rs: 25098.93

ABSTRACT:
A. Cost of Materials Rs: 389968.95
B. Hire charges of Machinery Rs: 20903.20
C. Cost of Labour Rs: 25098.93
Total Rs: 435971.08
Add for excise duty on 75 percent cost
excluding cost of materials @ 18.00% Rs: 6210.29
Add for insurance charges @ 1.00% Rs: 4359.71
Add for designs and drawings @ 2.5% Rs: 10899.28
Add for zigs / supports / winches / chain-pulley @ 2.5% Rs: 10899.28
Add for power supply arrangements @ 2.5% Rs: 10899.28
Add for enabling works @ 2% Rs: 8719.42
Total Rs: 487958.33
Add for 2 rehandling leads for 1 km including loading and unloading :
Fabricated parts 2x9.215 tonnes @ Rs: 81.30 / tonne Rs: 1498.36
Add for transportation upto work site @ 3% Rs: 14638.75
Total cost for 9.215 tonne Rs: 504095.43
Rate per tonne Rs: 54700.00

SECTION: GATE / HOIST & ALLIED WORKS. YEAR: 2003-2004 ITEM No: 18

ITEM: Design, fabrication, supply, erection, testing and commissioning of automatic lifting beam
with all accessories for handling, lowering and lifting of river sluice / canal sluice emergency
gate including cost of all materials, machinery, labour, cutting, aligning, welding, finishing,
cleaning, applying one coat of zinc rich epoxy primer and two coats of cold applied coal tar
epoxy paint etc., complete as per specifications and drawings with all leads and lifts.

DATA: Automatic lifting beam for lifting river sluice emergency gate consists of fabricated beam with
lifting bracket and automatic engaging / dis-engaging type hooks for under water hooking /
de-hooking of gate leaf. Lifting beam is an independent attachment to moving gantry crane.
Generally the weight of lifting beam for river sluice emergency gate will be about 10 percent of
the weight of gate leaf with ballast.
Consider river sluice emergency gate for sluice opening of size 2.5 m x 3 m for analysis.
Details of material/ Gas cutting / Welding considered for rate analysis are based on lifting beam
drawings for river sluice emergency gate of Kodasalli dam.
Weight of lifting beam for emergency gate for 2.5 m x 3 m sluice as per empirical formula :
Weight of lifting beam in tonnes = 0.0090 ( L^2 x H x h )^0.659
Where ( L ) is length and ( H ) is height of gate and ( h ) is head of water above sill in Rm.
For vent opening of 2.5 x 3.0 m the approximate size of gate leaf will be : 3.2 m x 3.3 m
Head of water above sill level considered : 34 m
Weight lifting beam in tonnes = 0.0090 ( 3.2 x 3.2 x 3.3 x 33 ) ^ 0.659 : 0.917 tonne
The actual weight of lifting beam as per data sheet : 0.922 tonne

72
GATES AND HOISTS

Consider actual weight for data rate analysis.


1. Requirement of materials : as per fabrication drawings ( for details refer Item : 18 of Annexer )
Structural steel :
Structural steel angles / beams / channels / bars with 2.5 % wastage : 234 kg
Structural steel plates / flats with 2.5 % wastage : 488 kg
Alloy steel components :
Pins : 71 kg
Bronze alloy components :
Bush : 4 kg
Forged steel components :
Hooks : 130 kg
Bolts / Nuts / Washers :
MS bolts / nuts / washers with 2.5 % wastage : 2 kg
MS pipe 100 mm dia : 11 kg
Welding electrodes for stitch welding at 10 % of total with 2.5 % wastage : 43 Nos
Welding electrodes ( LH ) for run welding at 90 % of total with 2.5 % wastage : 387 Nos
2. Cutting :
Length of cutting assuming cutting for 2 sides : 43 Rm
Add for variations ( cutting for more than 2 sides / odd shapes etc ) at 10 % : 4 Rm
Total : 47 Rm
For cutting structural steel sections to required sizes gas cutting is assumed.
Length of steel to be cut by using gas manually : 10 m
Length of steel to be cut by gas using pug cutting machine : 37 m
Time for gas cutting manually assuming average cutting progress of 2 m / hour : 5 hours
Time for gas cutting by pug cutting machine at ( av ) 3 m / hour : 12 hours
Acetelyne gas @ 0.6 cum / hour ( 17 x 0.60 ) : 10 cum
Oxygen gas @ 1.8 cum / hour ( 17 x 1.80 ) : 30 cum
Use of gas cutting torch with 50 min / hr working ( 5 x 60 / 50 ) : 6 hours
Use of pug cutting machine with 50 min / hr working ( 12 x 60 / 50 ) : 15 hours
3. Welding :
Length of welding : 49 Rm
For stich welding @ 2 hrs usage / shift & @ 15 electrodes / hr
( 43 / 15 ) x 8 / 2 : 12 hours
For run welding @ 6 hrs usage / shift & @ 12 electrodes / hr
( 387 / 15 ) x 8 / 6 : 35 hours
Total : 47 hours
Deploy welding transformer for 47 hours.
Fuel / Energy charges @ 25 % hrs for stitch welding & @ 75 % hrs for run welding.
( 12 x 0.25 + 35 x 0.75 ) : : 29 hours
4. Surface cleaning and painting :
Painting area for lifting beam at 12 sqm / tonne : 11 sqm
1 coat of zinc rich epoxy primer 40 micron dry film each coat.
Quantity of primer paint for 11 sqm @ 9 sqm / ltr / coat : 1.25 ltr
2 coats of coal tar epoxy paint 100 micron dry film each coat.
Quantity of coal tar epoxy paint for 11 sqm @ 6 sqm / ltr / coat : 4 ltr
As surface cleaning by sand blasting is hazardous, it is proposed to adopt chemical treatment
to remove grease, rust, scaling etc., and to form phasphate coating to prevent further rusting
before applying primer painting.
Quantity of rust cleaner / inhibitor at 8 sqm / ltr : 1.5 ltr
5. Requirement of other machinery :
For drilling holes for pins / guide shoes 2 hours use of drilling machine considered.
For grinding and finishing weld joints 1 hour use of grinding machine considered.

73
GATES AND HOISTS

6. Requirement of work force :


Work component Foreman Marker / Gas cutter / Helper
Fabricator / Welder
Erector
Cutting sections 17 hours 1 2 2 4
Drilling holes for pins / bolts fixing --- 1 1
Fabricating by stitch welding 12 hours 1 1 --- 2
Run welding 35 hours --- --- 4 4
Finishing / guide shoe fixing / checking --- 1 --- 1
Total : 2 5 6 12
Note : It is assumed that all stitch welding will be done by fabricator. Hence, no separate provision is
considered for welder for stitch welding.
For surface cleaning by chemical cleaner
and wire brushing at 15 sqm / day : 1 helper for 11 sqm
For painting 1 coat primer and 2 coats
finishing paint at 15 sqm / day : 2 painter Cl-ll & 1 helper for 3x11 sqm
7. Excise duty on supply :
Excise duty is applicable on supply of fabricated parts. The cost of materials is inclusive of all
taxes/ duties. Therefore, for purpose of rate analysis 75 percent of total cost excluding the cost
of materials ( assuming 25 % erection cost ) is considered for assessing excise duty.
8. Use rate of materials :
Cost of welding set @ Rs: 3375.00 / Each Rs: 3375.00
Life of welding set : 1000 hours
Use rate of welding set per hour ( cost / life ) Rs: 3.38
Cost of gas cutting set @ Rs: 1125.00 / Each Rs: 1125
Life of gas cutting set : 600 hours
Use rate of gas cutting set per hr ( cost / life ) Rs: 1.88

RATE ANALYSIS UNIT : 0.922 tonne


A. MATERIALS:
Sl No Perticulars Unit Quantity Rate Amount
in Rs. in Rs.
1 Structural steel
Angles / beams / channels / bars kg 234.00 20.00 4680.00
Plates / flats kg 488.00 24.00 11712.00
2 Alloy steel components
Lifting pins kg 71.00 175.00 12425.00
3 Bronze alloy components :
Bronze bush kg 4.00 380.00 1520.00
4 Forged steel components :
Lifting hooks kg 130.00 130.00 16900.00
5 MS pipe 100 mm dia kg 11.00 30.00 330.00
6 Bolt / Nut / Washer
MS bolts / nuts / washers kg 2.00 45.00 90.00
7 Oxygen gas cum 30.00 40.00 1200.00
8 Acetyline gas cum 10.00 185.00 1850.00
9 Welding electrodes Nos 43.00 4.00 172.00
10 Welding electrodes ( LH ) Nos 387.00 6.00 2322.00
11 Zinc rich epoxy primer ltr 1.25 525.00 656.25
12 Coal tar epoxy paint ltr 4.00 131.00 524.00
13 Rust cleaner / inhibitor ltr 1.50 175.00 262.50
14 Use rate welding holder set Hour 47.00 3.38 158.63
15 Use rate gas cutting torch set Hour 6.00 1.88 11.25

74
GATES AND HOISTS

16 Wire brush Nos 1.00 25.00 25.00


17 Sundries LS 5.00 22.50 112.50
TOTAL Rs: 54951.13
Add for small Tools and Plants @ 1% Rs: 549.51
Add for Contractor' Profit @ 10% Rs: 5495.11
Add for Contrators' Overheads @ 5% Rs: 2747.56
Total cost of Materials Rs: 63743.31

B. MACHINERY:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Welding transformer Hour 47.00 9.00 423.00
Fuel / Energy charges Hour 29.00 49.00 1421.00
2 Pug cutting machine Hour 15.00 13.00 195.00
Fuel / Energy charges Hour 15.00 2.00 30.00
3 Grinding machine Hour 1.00 15.00 15.00
Fuel / Energy charges Hour 1.00 20.00 20.00
4 Drilling machines Hour 2.00 15.00 30.00
Fuel / Energy charges Hour 2.00 20.00 40.00
5 Sundries LS 5.00 22.50 112.50
TOTAL Rs: 2286.50
Add for small Tools and Plants @ 1% Rs: 22.87
Add for Contractor' Profit on DPOL / Energy @ 10% Rs: 162.35
Add for Contrators' Overheads @ 5% Rs: 114.33
Total hire charges of Machinery Rs: 2586.04

C. LABOUR:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Crew for Drilling machine Hour 2.00 35.00 70.00
2 Crew for Grinding machine Hour 1.00 35.00 35.00
3 Foreman Day 2.00 108.65 217.30
4 Marker / Fabricator / Erector Day 5.00 93.70 468.50
5 Gas cutter Day 2.00 93.70 187.40
6 Welder ( General ) Day 4.00 93.70 374.80
7 Helper fabrication / erection Day 12.00 81.60 979.20
8 Helper for cleaning / painting Day 2.00 81.60 163.20
9 Painter Cl - II Day 2.00 81.60 163.20
10 Electrician Day 1.00 82.65 82.65
TOTAL Rs: 2741.25
Add for small Tools and Plants @ 1% Rs: 27.41
Add for Contractor' Profit @ 10% Rs: 274.13
Add for hidden cost on Labour @ 15% Rs: 411.19
Add for additional hidden cost on labour @ 10% Rs: 274.13
Add for Contrators' Overheads @ 5% Rs: 137.06
Total cost of Labour Rs: 3865.16

ABSTRACT:
A. Cost of Materials Rs: 63743.31
B. Hire charges of Machinery Rs: 2586.04
C. Cost of Labour Rs: 3865.16
Total Rs: 70194.51
Add for excise duty on 75 percent cost
excluding cost of materials @ 18.00% Rs: 870.91
Add for insurance charges @ 1.00% Rs: 701.95

75
GATES AND HOISTS

Add for designs and drawings @ 2.5% Rs: 1754.86


Add for zigs / supports / winches / chain-pulley @ 2.5% Rs: 1754.86
Add for power supply arrangements @ 2.5% Rs: 1754.86
Add for enabling works @ 2% Rs: 1403.89
Total Rs: 78435.84
Add for 2 rehandling leads for 1 km including loading and unloading :
Fabricated parts 2x0.922 tonnes @ Rs: 81.30 / tonne Rs: 149.92
Add for transportation upto work site @ 3% Rs: 2353.08
Total cost for 0.922 tonne Rs: 80938.84
Rate per tonne Rs: 87790.00

SECTION: GATE / HOIST & ALLIED WORKS. YEAR: 2003-2004 ITEM No: 19

ITEM: Design, fabrication, supply, erection and commissioning of embedded parts consisting of
sill beam, wheel tracks, seal seats / tracks, guide rails, etc., with all accessories for vertical
lift barrage gate including cost of all materials, machinery, labour, cutting, aligning, anchoring,
welding, finishing, cleaning, applying one coat of zinc rich epoxy primer and four coats of cold
applied coal tar epoxy paint, etc., complete as per specifications and aproved drawings with
all leads and lifts.

DATA: Barrage gate embedded parts consist of sill beam, wheel tracks / seal tracks and gate guides
with accessories such as first / second stage anchors.
Weight of embedded parts for barrage gate will be about 15 to 20 percent of gate weight.
Consider embedded parts for vertical lift gate for barrage opening of size 13.7 m x 8.26 m.
Details of material / Gas cutting / Welding considered for rate analysis are based on embedded
parts drawings for barrage gates of Hipparagi Barrage.
Weight of embedded parts in tonne for vertical lift gate based on empirical formula :
Weight in tonnes = 0.0055 ( L^2 x H x h )^0.716
Where ( L ) is length and ( H ) is height of gate and ( h ) is head of water above sill in Rm.
For vent opening of 13.72 x 8.26 m the approximate size of gate leaf will be 14.7 x 8.6 m.
Head of water above sill level considered : 8.26 m
Weight of embedded parts in tonnes = 0.0055 ( 14.7 x 14.7 x 8.6 x 8.26 ) ^ 0.716
: 5.465 tonnes
The actual weight of embedded parts as per data sheet : 5.193 tonnes
Consider actual weight for data rate analysis.
1. Requirement of materials : as per fabrication drawings ( for details refer Item : 19 of Annexer )
a. Structural steel conforming to IS : 2062 :
Structural steel angles / beams / channels / bars with 2.5 % wastage : 603 kg
Structural steel plates / flats with 2.5 % wastage : 3777 kg
b. Alloy steel components conforming to IS : 1570 :
Stainless steel plates / flats : 772.00 kg
c. Bolt / Nut / Washer conforming ti IS : 1363 :
MS bolts and nuts with 2.5 % wastage : 171 kg
d. Welding electrodes :
Welding electrodes for stitch welding at 10 % of total with 2.5 % wastage : 665 Nos
Welding electrodes (SS) for stitch welding at 10 % of total with 2.5 % wastage : 117 Nos
Welding electrodes ( LH ) for run welding at 90 % of total with 2.5 % wastage : 5983 Nos
Welding electrodes ( SS ) for run welding at 90 % of total with 2.5 % wastage : 1055 Nos
2. Cutting :
Length of cutting assuming cutting for 2 sides as per data sheet : 210 Rm
Add for variations ( cutting for more than 2 sides / odd shapes etc ) at 10 % : 21 Rm
Total length of cutting : 231 Rm
For cutting structural steel sections to required size gas cutting and use of plate shearing
machine is considered.
Length of steel to be cut by using gas manually : 50 m

76
GATES AND HOISTS

Length of steel to be cut by gas using pug cutting machine : 151 m


Length of steel to be cut by using shearing machine : 30 m
Time for gas cutting manually assuming average cutting progress of 2 m / hour : 25 hours
Time for gas cutting by pug cutting machine at ( av ) 3 m / hour : 50 hours
Time for cutting by shearing machine at av. 10 m / hr progress : 3 hours
Acetelyne gas @ 0.6 cum / hour ( 75 x 0.60 ) : 45 cum
Oxygen gas @ 1.8 cum / hour ( 75 x 1.80 ) : 135 cum
Use of gas cutting torch with 50 min / hr working ( 25 x 60 / 50 ) : 30 hours
Use of pug cutting machine with 50 min / hr working ( 50 x 60 / 50 ) : 60 hours
Use of shearing machine with 50 min / hr working ( 3 x60 / 50) : 4 hours
3. Welding :
Length of welding as per data sheet : 252 m
For stich welding @ 2 hrs usage / shift & @ 15 electrodes / hr
( 665 + 117 ) x 8 / 15 / 2 : 209 hours
For run welding @ 6 hrs usage / shift & @ 15 electrodes / hr
( 5983 + 1055 ) x 8 / 15 / 6 : : 626 hours
Total : 835 hours
Deploy welding transformer for 835 hours.
Fuel / Energy charges @ 25 % hrs for stitch welding & @ 75 % hrs for run welding.
( 209 x 0.25 + 626 x 0.75 ) : 522 hours
4. Planing SS plates for wheel / seal tracks :
For surface finishing of SS plates for wheel / seal tracks planing machine is considered.
Length of SS plate for surface finishing by planing machine : 32.5 Rm
Length of planing at a time for 4 m stroke planing machine : 3 Rm
Time for planing 3 m length section with 50 min / hour working : 8 hours
Time for planing 32.5 m SS plates ( 32.5 x 8 / 3 ) : 88 hours
5. Surface cleaning and painting :
Painting area for embedded parts at 10 sqm / tonne : 52 sqm
1 coat of zinc rich epoxy primer 40 micron dry film each coat.
Quantity of primer paint for 52 sqm @ 9 sqm / ltr / coat : 6 ltr
4 coats of coal tar epoxy paint 100 micron dry film each coat.
Quantity of coal tar epoxy paint for 52 sqm @ 6 sqm / ltr / coat : 35 ltr
As surface cleaning by sand blasting is hazardous, it is proposed to adopt chemical treatment
to remove grease, rust, scaling etc., and to form phasphate coating to prevent further rusting
before applying primer painting.
Quantity of rust cleaner / inhibitor at 8 sqm / ltr : 6.5 ltr
6. Requirement of other machinery :
For drilling holes for anchor bolts use of drilling machine for 16 hours considered.
For grinding weld joints and edges requiring finishing use of grinding machine for 8 hours
considered.
For handling during fabrication and erection mobile derric crane for 5 hours considered.
7. Requirement of work force :
Work component Foreman Marker / Gas cutter / Helper
Fabricator / Welder
Erector
Cutting sections 94 hours 6 12 12 24
Drilling holes for anchors / supports 1 2 --- 4
Fabricating by stitch welding 209 hours 13 26 --- 52
Run welding 626 hours 8 --- 78 78
Erection of first stage anchors 5 10 --- 10
Erection of Sill beam / Tracks / Guide 2 4 --- 8
Finishing / cleaning 2 2 --- 4
Total : 37 56 90 180
Note : It is assumed that all stitch welding will be done by fabricator. Hence, no separate provision is
considered for welder for stitch welding.

77
GATES AND HOISTS

For surface cleaning by chemical cleaner


and wire brushing at 15 sqm / day : 4 helper for 52 sqm
For painting 1 coat primer and 4 coats
finishing paint at 15 sqm / day : 17 painter Cl-ll & 3 helper for 5 x 52 sqm
8. Excise duty on supply :
Excise duty is applicable on supply of fabricated parts. The cost of materials is inclusive of all
taxes/ duties. Therefore, for purpose of rate analysis 75 percent of total cost excluding the cost
of materials ( assuming 25 % erection cost ) is considered for assessing excise duty.
9. Use rate of materials :
Cost of welding set @ Rs: 3375.00 / Each Rs: 3375.00
Life of welding set : 1000 hours
Use rate of welding set per hour ( cost / life ) Rs: 3.38
Cost of gas cutting set @ Rs: 1125.00 / Each Rs: 1125
Life of gas cutting set : 600 hours
Use rate of gas cutting set per hr ( cost / life ) Rs: 1.88

RATE ANALYSIS UNIT : 5.193 tonne


A. MATERIALS:
Sl No Perticulars Unit Quantity Rate Amount
in Rs. in Rs.
1 Str steel angle / beam / channel / bars kg 603.00 20.00 12060.00
2 Structural steel plate / flats kg 3777.00 24.00 90648.00
3 Stainless steel plate / flats kg 772.00 90.00 69480.00
4 MS bolts and nuts kg 171.00 45.00 7695.00
5 Oxygen gas cum 135.00 40.00 5400.00
6 Acetyline gas cum 45.00 185.00 8325.00
7 Welding electrodes Nos 665.00 4.00 2660.00
8 Welding electrodes ( LH ) Nos 5983.00 6.00 35898.00
9 Welding electrodes ( stainless steel ) Nos 1172.00 35.00 41020.00
10 Zinc rich epoxy primer ltr 6.00 525.00 3150.00
11 Coal tar epoxy paint ltr 35.00 131.00 4585.00
12 Rust cleaner / inhibitor ltr 6.50 175.00 1137.50
13 Use rate welding holder set Hour 835.00 3.38 2818.13
14 Use rate gas cutting torch set Hour 30.00 1.88 56.25
15 Wire brush Nos 2.00 25.00 50.00
16 Sundries LS 25.00 22.50 562.50
TOTAL Rs: 285545.38
Add for small Tools and Plants @ 1% Rs: 2855.45
Add for Contractor' Profit @ 10% Rs: 28554.54
Add for Contrators' Overheads @ 5% Rs: 14277.27
Total cost of Materials Rs: 331232.64

B. MACHINERY:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Welding transformer Hour 835.00 9.00 7515.00
Fuel / Energy charges Hour 522.00 49.00 25578.00
2 Plate shearing machine Hour 4.00 47.00 188.00
Fuel / Energy charges Hour 4.00 82.00 328.00
3 Pug cutting machine Hour 60.00 13.00 780.00
Fuel / Energy charges Hour 60.00 2.00 120.00
4 Planing machine Hour 88.00 66.00 5808.00
Fuel / Energy charges Hour 88.00 61.00 5368.00
5 Mobile derric crane Hour 5.00 261.00 1305.00
Fuel / Energy charges Hour 5.00 117.00 585.00

78
GATES AND HOISTS

6 Grinding machine Hour 8.00 15.00 120.00


Fuel / Energy charges Hour 8.00 20.00 160.00
7 Drilling machines Hour 16.00 15.00 240.00
Fuel / Energy charges Hour 16.00 20.00 320.00
8 Sundries LS 20.00 22.50 450.00
TOTAL Rs: 48865.00
Add for small Tools and Plants @ 1% Rs: 488.65
Add for Contractor' Profit on DPOL / Energy @ 10% Rs: 3290.90
Add for Contrators' Overheads @ 5% Rs: 2443.25
Total hire charges of Machinery Rs: 55087.80

C. LABOUR:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Crew for Mobile crane Hour 5.00 32.90 164.50
2 Crew for Plate shearing machine Hour 4.00 26.70 106.80
3 Crew for Planing machine Hour 88.00 42.75 3762.00
4 Crew for Drilling machine Hour 16.00 35.00 560.00
5 Crew for Grinding machine Hour 8.00 35.00 280.00
6 Foreman Day 37.00 108.65 4020.05
7 Marker / Fabricator / Erector Day 56.00 93.70 5247.20
8 Gas cutter Day 12.00 93.70 1124.40
9 Welder ( General ) Day 70.00 93.70 6559.00
10 Welder ( X - ray ) Day 8.00 103.07 824.56
11 Helper fabrication / erection Day 180.00 81.60 14688.00
12 Helper for cleaning / painting Day 7.00 81.60 571.20
13 Painter Cl - II Day 17.00 81.60 1387.20
14 Electrician Day 2.00 82.65 165.30
TOTAL Rs: 39460.21
Add for small Tools and Plants @ 1% Rs: 394.60
Add for Contractor' Profit @ 10% Rs: 3946.02
Add for hidden cost on Labour @ 15% Rs: 5919.03
Add for additional hidden cost on labour @ 10% Rs: 3946.02
Add for Contrators' Overheads @ 5% Rs: 1973.01
Total cost of Labour Rs: 55638.90

ABSTRACT:
A. Cost of Materials Rs: 331232.64
B. Hire charges of Machinery Rs: 55087.80
C. Cost of Labour Rs: 55638.90
Total Rs: 441959.33
Add for excise duty on 75 percent cost
excluding cost of materials @ 18.00% Rs: 14948.10
Add for insurance charges @ 1% Rs: 4419.59
Add for designs and drawings @ 2.5% Rs: 11048.98
Add for zigs / supports / winches / chain-pulley @ 2.5% Rs: 11048.98
Add for power supply arrangements @ 2.5% Rs: 11048.98
Add for enabling works @ 2% Rs: 8839.19
Total Rs: 503313.16
Add for 2 rehandling leads for 1 km including loading and unloading :
Fabricated parts 2x5.193 tonnes @ Rs: 81.30 / tonne Rs: 844.38
Add for transportation upto work site @ 3% Rs: 15099.39
Total cost for 5.193 tonne Rs: 519256.94
Rate per tonne Rs: 99990.00

79
GATES AND HOISTS

SECTION: GATE / HOIST & ALLIED WORKS. YEAR: 2003-2004 ITEM No: 20

ITEM: Design, fabrication, supply, erection, testing and commissioning of fixed wheel type vertical
lift gate consisting of skin plate, vertical and horizontal girders, wheels, stiffeners, lifting
brackets, guide shoes, rubber seals etc., with all accessories for barrage including cost of all
materials, machinery, labour, cutting, aligning, welding, finishing, cleaning, applying one coat
of zinc rich epoxy primer and three coats of cold applied coal tar epoxy paint, seal fixing etc.,
complete as per specifications and approved drawings with all leads and lifts.

DATA: Consider upstream seal vertical lift roller gate. The gate leaf consists of skin plate, horizontal
girders, vertical end girders, stiffeners, wheels, gate guide shoes, brackets for pulleys, seals
etc., with all accessories.
Consider vertical lift roller gate for 13.72 m x 8.26 m opening for analysis.
Details of material / Gas cutting / Welding considered for rate analysis are based on vertical lift
roller gate drawings of Hipparagi Barrage.
Weight of gate leaf in tonne for vertical lift gate based on empirical formula :
Weight in tonnes = 0.0335 ( L^2 x H x h )^0.716
Where ( L ) is length and ( H ) is height of gate and ( h ) is head of water above sill in Rm.
For vent opening of 13.72 x 8.26 m the approximate size of gate leaf will be 14.7 x 8.6 m.
Head of water above sill level considered : 8.26 m
Weight in tonnes = 0.0335 ( 14.7 x 14.7 x 8.6 x 8.26 ) ^ 0.716 : 33.289
The actual weight of vertical lift barrage gate as per data sheet : 33.025 tonnes
Consider actual weight for data rate analysis.
1. Requirement of materials : as per fabrication drawings ( for details refer Item : 20 of Annexer )
a. Structural steel conforming to IS : 2062 :
Structural steel angles / beams / channels with 2.5 % wastage : 3382 kg
Structural steel plates / flats with 2.5 % wastage : 29372 kg
b. Alloy steel components conforming to IS : 1570 :
Wheel axles / Pins : 176 kg
c. Cast steel components conforming to IS : 1030 :
Wheels : 656 kg
d. Alluminium / Bronze alloy components conforming to IS : 305 :
Bearings / Bushes : 80 kg
e. Bolts / Nuts / Washers conforming to IS : 1363 :
GI bolts / nuts / washers with 2.5 % wastage : 93 kg
MS bolts / nuts / washers with 2.5 % wastage : 70 kg
f. Rubber seal conforming to IS : 11855 :
Bottom seal ( flat uncladed ) : 14.5 Rm
Side seals ( bulb uncladed ) : 18 Rm
g. Welding electrodes :
Welding electrodes for stitch welding at 10 % of total with 2.5 % wastage : 1574 Nos
Welding electrodes ( LH ) for run welding at 90 % of total with 2.5 % wastage : 14161 Nos
2. Cutting :
Length of cutting assuming cutting for 2 sides : 695 Rm
Add for variations ( cutting for more than 2 sides / odd shapes etc ) at 10 % : 70 Rm
Total : 765 Rm
For cutting structural steel sections to required sizes gas cutting and plate shearing machine
for plates less than 12 mm thick are considered.
Length of steel to be cut by using gas manually : 200 m
Length of steel to be cut by gas using pug cutting machine : 465 m
Length of steel to be cut by gas using plate shearing machine : 100 m
Time for gas cutting manually assuming average cutting progress of 2 m / hour : 100 hours
Time for gas cutting by pug cutting machine at ( av ) 3 m / hour : 155 hours
Time for cutting by plate shearing machine at ( av ) 10 m / hour : 10 hours
Acetelyne gas @ 0.6 cum / hour ( 255 x 0.60 ) : 153 cum

80
GATES AND HOISTS

Oxygen gas @ 1.8 cum / hour ( 255 x 1.80 ) : 459 cum


Use of gas cutting torch with 50 min / hr working ( 100 x 60 / 50 ) : 120 hours
Use of pug cutting machine with 50 min / hr working ( 155 x 60 / 50 ) : 186 hours
Use of plate shearing machine with 50 min / hr working ( 10 x 60 / 50 ) : 12 hours
3. Welding :
Length of welding : 1837 Rm
For stich welding @ 2 hrs usage / shift & @ 15 electrodes / hr
( 1574 / 15 ) x 8 / 2 : 420 hours
For run welding @ 6 hrs usage / shift & @ 15 electrodes / hr
( 14161 / 15 ) x 8 / 6 : 1259 hours
Total : 1679 hours
Deploy welding transformer for 1679 hours.
Fuel / Energy charges @ 25 % hrs for stitch welding & @ 75 % hrs for run welding.
( 420 x 0.25 + 1259 x 0.75 ) : 1049 hours
4. Surface cleaning and painting :
Painting area for barrage gate at 18 sqm / tonne : 595 sqm
1 coat of zinc rich epoxy primer 40 micron dry film each coat.
Quantity of primer paint for 595 sqm @ 9 sqm / ltr / coat : 66 ltr
3 coats of coal tar epoxy paint 100 micron dry film each coat.
Quantity of coal tar epoxy paint for 595 sqm @ 6 sqm / ltr / coat : 298 ltr
As surface cleaning by sand blasting is hazardous, it is proposed to adopt chemical treatment
to remove grease, rust, scaling etc., and to form phasphate coating to prevent further rusting
before applying primer painting.
Quantity of rust cleaner / inhibitor at 8 sqm / ltr : 75 ltr
5. Requirement of other machinery :
For lowering gate leaf use of tower crane for 4 hours considered.
For handling of gate parts during fabrication and erection mobile derric crane for 50 hours and
stationery derric crane for 100 hours considered.
For drilling holes in skin plate and seal base / clamps use of drilling machine for 50 hours
considered.
For grinding and finishing weld joints in skin plate and other locations 50 hours use of grinding
machine considered.
6. Requirement of work force :
Work component Foreman Marker / Gas cutter / Helper
Fabricator / Welder
Erector
Cutting sections 318 hours 20 40 40 80
Drilling holes for seal fixing 3 6 --- 6
Fabricating by stitch welding 420 hours 26 52 --- 104
Run welding 1259 hours 16 --- 158 158
Joining units & wheel fixing 4 8 32
Seal fixing & guide shoe fixing 1 2 4
Aligning and lowering in position 1 2 4
Cleaning / checking 1 2 --- 2
Total : 72 112 198 390
Note : It is assumed that all stitch welding will be done by fabricator. Hence, no separate provision is
considered for welder for stitch welding.
For surface cleaning by chemical cleaner
and wire brushing at 15 sqm / day : 40 helper for 595 sqm
For painting 1 coat primer and 3 coats
finishing paint at 15 sqm / day : 158 painter Cl-ll & 30 helper for 4 x 595 sqm
7. Excise duty on supply :
Excise duty is applicable on supply of fabricated parts. The cost of materials is inclusive of all
taxes/ duties. Therefore, for purpose of rate analysis 75 percent of total cost excluding the cost
of materials ( assuming 25 % erection cost ) is considered for assessing excise duty.

81
GATES AND HOISTS

8. Use rate of materials :


Cost of welding set @ Rs: 3375.00 / Each Rs: 3375.00
Life of welding set : 1000 hours
Use rate of welding set per hour ( cost / life ) Rs: 3.38
Cost of gas cutting set @ Rs: 1125.00 / Each Rs: 1125
Life of gas cutting set : 600 hours
Use rate of gas cutting set per hr ( cost / life ) Rs: 1.88

RATE ANALYSIS UNIT : 33.025 tonne


A. MATERIALS:
Sl No Perticulars Unit Quantity Rate Amount
in Rs. in Rs.
1 Structural steel
Angle / beam / channel kg 3382.00 20.00 67640.00
Plates / flats kg 29372.00 24.00 704928.00
3 Alloy steel components
Wheel axles / Pins kg 176.00 175.00 30800.00
4 Cast steel components
Wheels kg 656.00 85.00 55760.00
5 Alluminium / Bronze alloy components
Bearings / Bushes kg 80.00 380.00 30400.00
6 Bolt / Nut / Washer
GI bolts / nuts / washers kg 93.00 60.00 5580.00
MS bolts / nuts / washers kg 70.00 45.00 3150.00
7 Rubber seals
Bottom seal ( flat uncladed ) Rm 14.50 120.00 1740.00
Side seals ( bulb uncladed ) Rm 18.00 190.00 3420.00
8 Oxygen gas cum 459.00 40.00 18360.00
9 Acetyline gas cum 153.00 185.00 28305.00
10 Welding electrodes Nos 1574.00 4.00 6296.00
11 Welding electrodes ( LH ) Nos 14161.00 6.00 84966.00
12 Zinc rich epoxy primer ltr 66.00 525.00 34650.00
13 Coal tar epoxy paint ltr 298.00 131.00 39038.00
14 Rust cleaner / inhibitor ltr 75.00 175.00 13125.00
15 Use rate welding holder set Hour 1679.00 3.38 5666.63
16 Use rate gas cutting torch set Hour 120.00 1.88 225.00
17 Wire brush Nos 10.00 25.00 250.00
18 Sundries LS 100.00 22.50 2250.00
TOTAL Rs: 1136549.63
Add for small Tools and Plants @ 1% Rs: 11365.50
Add for Contractor' Profit @ 10% Rs: 113654.96
Add for Contrators' Overheads @ 5% Rs: 56827.48
Total cost of Materials Rs: 1318397.57

B. MACHINERY:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Welding transformer Hour 1679.00 9.00 15111.00
Fuel / Energy charges Hour 1049.00 49.00 51401.00
2 Pug cutting machine Hour 186.00 13.00 2418.00
Fuel / Energy charges Hour 186.00 2.00 372.00
3 Plate shearing machine Hour 12.00 47.00 564.00
Fuel / Energy charges Hour 12.00 82.00 984.00
4 Tower crane Hour 4.00 763.00 3052.00
Fuel / Energy charges Hour 4.00 106.00 424.00

82
GATES AND HOISTS

5 Mobile derric crane Hour 50.00 261.00 13050.00


Fuel / Energy charges Hour 50.00 117.00 5850.00
6 Stationery derric crane Hour 100.00 50.00 5000.00
Fuel / Energy charges Hour 100.00 5.00 500.00
7 Grinding machine Hour 50.00 15.00 750.00
Fuel / Energy charges Hour 50.00 20.00 1000.00
8 Drilling machines Hour 50.00 15.00 750.00
Fuel / Energy charges Hour 50.00 20.00 1000.00
9 Sundries LS 100.00 22.50 2250.00
TOTAL Rs: 104476.00
Add for small Tools and Plants @ 1% Rs: 1044.76
Add for Contractor' Profit on DPOL / Energy @ 10% Rs: 6378.10
Add for Contrators' Overheads @ 5% Rs: 5223.80
Total hire charges of Machinery Rs: 117122.66

C. LABOUR:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Crew for Mobile crane Hour 50.00 32.90 1645.00
2 Crew for Tower crane Hour 4.00 36.05 144.20
3 Crew for Plate shearing machine Hour 12.00 26.70 320.40
4 Crew for Drilling machine Hour 50.00 35.00 1750.00
5 Crew for Grinding machine Hour 50.00 35.00 1750.00
6 Foreman Day 72.00 108.65 7822.80
7 Marker / Fabricator / Erector Day 112.00 93.70 10494.40
8 Gas cutter Day 40.00 93.70 3748.00
9 Welder ( General ) Day 142.00 93.70 13305.40
10 Welder ( X - ray grade ) Day 16.00 103.07 1649.12
11 Khalasi Day 50.00 83.65 4182.50
12 Helper fabrication / erection Day 390.00 81.60 31824.00
13 Helper for cleaning / painting Day 70.00 81.60 5712.00
14 Painter Cl - II Day 158.00 81.60 12892.80
15 Electrician Day 20.00 82.65 1653.00
TOTAL Rs: 98893.62
Add for small Tools and Plants @ 1% Rs: 988.94
Add for Contractor' Profit @ 10% Rs: 9889.36
Add for hidden cost on Labour @ 15% Rs: 14834.04
Add for additional hidden cost on labour @ 10% Rs: 9889.36
Add for Contrators' Overheads @ 5% Rs: 4944.68
Total cost of Labour Rs: 139440.00

ABSTRACT:
A. Cost of Materials Rs: 1318397.57
B. Hire charges of Machinery Rs: 117122.66
C. Cost of Labour Rs: 139440.00
Total Rs: 1574960.23
Add for excise duty on 75 percent cost
excluding cost of materials @ 18.00% Rs: 34635.96
Add for insurance charges @ 1.00% Rs: 15749.60
Add for designs and drawings @ 2.5% Rs: 39374.01
Add for zigs / supports / winches / chain-pulley @ 2.5% Rs: 39374.01
Add for power supply arrangements @ 2.5% Rs: 39374.01
Add for enabling works @ 2% Rs: 31499.20
Total Rs: 1774967.01

83
GATES AND HOISTS

Add for 2 rehandling leads for 1 km including loading and unloading :


Fabricated parts 2x33.025 tonnes @ Rs: 81.30 / tonne Rs: 5369.87
Add for transportation upto work site @ 3% Rs: 53249.01
Total cost for 33.025 tonne Rs: 1833585.89
Rate per tonne Rs: 55520.00

SECTION: GATE / HOIST & ALLIED WORKS. YEAR: 2003-2004 ITEM No: 21

ITEM: Design, fabrication, supply, erection and commissioning of structural steel hoist bridge
consisting of columns, beams, bracings, stiffeners, ties, chequered plate covering, hand railing,
ladder etc., with all accessories for supporting rope drum hoist for operating barrage
gates including cost of all materials, machinery, labour, cutting, aligning, anchoring, welding,
finishing, cleaning, applying two coats of zinc chromate red oxide primer and three coats of
synthetic enamel paint etc., complete with all leads and lifts.

DATA: Structural steel hoist bridge for supporting rope drum hoist for operating barrage gates consists
of steel columns and beams with cross beams, ties, bracings, stiffeners, hand railing, ladder,
chequered plate covering, anchorages etc., with all accessories.
Consider hoist bridge for supporting 50 t rope drum hoist.
Consider 15 m span and 10 m over all height for bridge.
Details of material / Gas cutting / Welding considered for rate analysis are based on structural
steel bridge drawings for barrage gates of Hipparagi Barrage.
Assessment of weight of structural steel for bridge:
Columns with bracings, anchors, stiffeners etc @ 400 kg / m for 9 m ht : 3600.00 kg
Beams with cross beams, stiffeners etc @ 400 kg / m for 15 m span : 6000.00 kg
Total : 9600.00 kg
Other accessories such as railing, chequered plate, ladder etc @ 10 % 960.00 kg
Total : 10560.00 kg
The actual weight of hoist supporting bridge as per data sheet : 10239.00 kg
Consider actual weight for data rate analysis.
1. Requirement of materials: as per fabrication drawings ( for details refer Item : 21 of Annexer )
a. Structural steel conforming to IS : 2062 :
Structural steel angles / beams / channels with 2.5 % wastage : 4564 kg
Structural steel plates / flats with 2.5 % wastage : 5567 kg
Chequered plate with 2.5 % wastage : 136 kg
b. MS pipes 32 mm dia : 32 Rm
MS pipes 25 mm dia : 64 Rm
c. Bolt / Nut / Washer
MS bolt / Nut / Washers with 2.5 % wastage : 18.5 kg
d. Welding electrodes :
Welding electrodes for stitch welding at 10 % of total with 2.5 % wastage : 388 Nos
Welding electrodes ( LH ) for run welding at 90 % of total with 2.5 % wastage : 3495 Nos
2. Cutting :
Length of cutting assuming cutting for 2 sides : 290 Rm
Add for variations ( cutting for more than 2 sides / odd shapes etc ) at 10 % : 29 Rm
Total : 319 Rm
For cutting structural steel sections to required sizes gas cutting is assumed.
Length of steel to be cut by using gas manually : 100 m
Length of steel to be cut by gas using pug cutting machine : 219 m
Time for gas cutting manually assuming average cutting progress of 2 m / hour : 50 hours
Time for gas cutting by pug cutting machine at ( av ) 3 m / hour : 73 hours
Acetelyne gas @ 0.6 cum / hour ( 123 x 0.60 ) : 74 cum
Oxygen gas @ 1.8 cum / hour ( 123 x 1.80 ) : 222 cum
Use of gas cutting torch with 50 min / hr working ( 50 x 60 / 50 ) : 60 hours
Use of pug cutting machine with 50 min / hr working ( 73 x 60 / 50 ) : 88 hours

84
GATES AND HOISTS

3. Welding :
Length of welding : 473 Rm
For stich welding @ 2 hrs usage / shift & @ 15 electrodes / hr
( 388 / 15 ) x 8 / 2 : 104 hours
For run welding @ 6 hrs usage / shift & @ 15 electrodes / hr
( 3495 / 15 ) x 8 / 6 : 311 hours
Total : 415 hours
Deploy welding transformer for 415 hours.
Fuel / Energy charges @ 25 % hrs for stitch welding & @ 75 % hrs for run welding.
( 104 x 0.25 + 311 x 0.75 ) : 259 hours
4. Surface cleaning and painting :
Painting area for hoist bridge @ 20 sqm per tonne : 205 sqm
2 coats of zinc chromate red oxide primer .
Quantity of primer paint for 205 sqm @ 12 sqm / ltr / coat : 35 ltr
3 coats of synthetic enamel paint.
Quantity of synthetic enamel paint for 205 sqm @ 12 sqm / ltr / coat : 51 ltr
As surface cleaning by sand blasting is hazardous, it is proposed to adopt chemical treatment
to remove grease, rust, scaling etc., and to form phasphate coating to prevent further rusting
before applying primer painting.
Quantity of rust cleaner / inhibitor at 8 sqm / ltr : 26 ltr
5. Requirement of other machinery :
For handling of parts during fabrication and erection mobile derric crane for 20 hours and
stationery derric crane for 40 hours considered.
For drilling holes in plates 8 hours use of drilling machine considered.
For grinding and finishing weld joints in liner plates 8 hours use of grinding machine considered.
6. Requirement of work force :
Work component Foreman Marker / Gas cutter / Helper
Fabricator / Welder
Erector
Cutting sections 148 hours 9 18 18 36
Fabricating by stitch welding 104 hours 6 13 --- 26
Run welding 311 hours 4 --- 39 39
For erection of columns & bracings 2 4 --- 8
For erection of beams / cross beams 4 8 --- 16
For erection of railing / covering etc 1 2 --- 4
Finishing / Cleaning 1 1 --- 1
Total : 27 46 57 130
Note : It is assumed that all stitch welding will be done by fabricator. Hence, no separate provision is
considered for welder for stitch welding.
For surface cleaning by chemical cleaner
and wire brushing at 15 sqm / day : 14 helper for 205 sqm
For painting 2 coats primer and 3 coats
finishing paint at 20 sqm / day : 51 painter Cl-ll & 10 helper for 5 x 205 sqm
7. Excise duty on supply :
Excise duty is applicable on supply of fabricated parts. The cost of materials is inclusive of all
taxes/ duties. Therefore, for purpose of rate analysis 75 percent of total cost excluding the cost
of materials ( assuming 25 % erection cost ) is considered for assessing excise duty.
8. Use rate of materials :
Cost of welding set @ Rs: 3375.00 / Each Rs: 3375.00
Life of welding set : 1000 hours
Use rate of welding set per hour ( cost / life ) Rs: 3.38
Cost of gas cutting set @ Rs: 1125.00 / Each Rs: 1125
Life of gas cutting set : 600 hours
Use rate of gas cutting set per hr ( cost / life ) Rs: 1.88

85
GATES AND HOISTS

RATE ANALYSIS UNIT : 10.239 tonne


A. MATERIALS:
Sl No Perticulars Unit Quantity Rate Amount
in Rs. in Rs.
1 Structural steel angles/ beams / channels kg 4564.00 20.00 91280.00
Structural steel plates / flats kg 5567.00 24.00 133608.00
Chequered plate kg 136.00 25.20 3427.20
2 MS pipe 32 mm dia Rm 32.00 80.00 2560.00
MS pipe 25 mm dia Rm 64.00 60.00 3840.00
3 Bolt / Nut / Washers kg 18.50 45.00 832.50
4 Oxygen gas cum 222.00 40.00 8880.00
5 Acetyline gas cum 74.00 185.00 13690.00
6 Welding electrodes Nos 388.00 4.00 1552.00
7 Welding electrodes ( LH ) Nos 3495.00 6.00 20970.00
8 Zinc chromate red oxide primer ltr 35.00 140.00 4900.00
9 Synthetic enamel paint ( 1st quality ) ltr 51.00 140.00 7140.00
10 Rust cleaner / inhibitor ltr 26.00 175.00 4550.00
11 Use rate welding holder set Hour 415.00 3.38 1400.63
12 Use rate gas cutting torch set Hour 60.00 1.88 112.50
13 Wire brush Nos 5.00 25.00 125.00
14 Sundries LS 50.00 22.50 1125.00
TOTAL Rs: 299992.83
Add for small Tools and Plants @ 1% Rs: 2999.93
Add for Contractor' Profit @ 10% Rs: 29999.28
Add for Contrators' Overheads @ 5% Rs: 14999.64
Total cost of Materials Rs: 347991.68

B. MACHINERY:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Welding transformer Hour 415.00 9.00 3735.00
Fuel / Energy charges Hour 259.00 49.00 12691.00
2 Pug cutting machine Hour 88.00 13.00 1144.00
Fuel / Energy charges Hour 88.00 2.00 176.00
3 Mobile derric crane Hour 20.00 261.00 5220.00
Fuel / Energy charges Hour 20.00 117.00 2340.00
4 Stationery derric crane Hour 40.00 50.00 2000.00
Fuel / Energy charges Hour 40.00 5.00 200.00
5 Drilling machine Hour 8.00 15.00 120.00
Fuel / Energy charges Hour 8.00 20.00 160.00
6 Grinding machine Hour 8.00 15.00 120.00
Fuel / Energy charges Hour 8.00 20.00 160.00
7 Sundries LS 50.00 22.50 1125.00
TOTAL Rs: 29191.00
Add for small Tools and Plants @ 1% Rs: 291.91
Add for Contractor' Profit on DPOL / Energy @ 10% Rs: 1685.20
Add for Contrators' Overheads @ 5% Rs: 1459.55
Total hire charges of Machinery Rs: 32627.66

C. LABOUR:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Crew for Mobile crane Hour 20.00 32.90 658.00
2 Crew for Drilling machine Hour 8.00 35.00 280.00
3 Crew for Grinding machine Hour 8.00 35.00 280.00

86
GATES AND HOISTS

4 Foreman Day 27.00 108.65 2933.55


5 Marker / Fabricator / Erector Day 46.00 93.70 4310.20
6 Gas cutter Day 18.00 93.70 1686.60
7 Welder ( General ) Day 39.00 93.70 3654.30
8 Helper fabrication / erection Day 130.00 81.60 10608.00
9 Helper for cleaning / painting Day 24.00 81.60 1958.40
10 Painter Cl - II Day 51.00 81.60 4161.60
11 Electrician Day 5.00 82.65 413.25
TOTAL Rs: 30943.90
Add for small Tools and Plants @ 1% Rs: 309.44
Add for Contractor' Profit @ 10% Rs: 3094.39
Add for hidden cost on Labour @ 15% Rs: 4641.59
Add for additional hidden cost on labour @ 10% Rs: 3094.39
Add for Contrators' Overheads @ 5% Rs: 1547.20
Total cost of Labour Rs: 43630.90

ABSTRACT:
A. Cost of Materials Rs: 347991.68
B. Hire charges of Machinery Rs: 32627.66
C. Cost of Labour Rs: 43630.90
Total Rs: 424250.24
Add for excise duty on 75 percent cost
excluding cost of materials @ 18.00% Rs: 10294.91
Add for insurance charges @ 1.00% Rs: 4242.50
Add for designs and drawings @ 2.5% Rs: 10606.26
Add for zigs / supports / winches / chain-pulley @ 2.5% Rs: 10606.26
Add for power supply arrangements @ 2.5% Rs: 10606.26
Add for enabling works @ 2% Rs: 8485.00
Total Rs: 479091.42
Add for 2 rehandling leads for 1 km including loading and unloading :
Fabricated parts 2x10.239 tonnes @ Rs: 81.30 / tonne Rs: 1664.86
Add for transportation upto work site @ 3% Rs: 14372.74
Total cost for 10.239 tonne Rs: 495129.02
Rate per tonne Rs: 48360.00

SECTION: GATE / HOIST & ALLIED WORKS. YEAR: 2003-2004 ITEM No: 22

ITEM: Design, fabrication, supply, erection, testing and commissioning of adequate capacity rope
drum hoist consisting of hoist platform, rope drum, pulleys, gear system, electri c motor,
electro-magnetic brake system, manual operation assembly, position indicator, control panel,
wire rope etc., with all accessories for operating vertical lift roller gates for barrage
including cost of all materials, machinery, labour, cutting, bending, aligning, anchoring, welding,
finishing, cleaning, applying two coats of zinc chromate red oxide primer and three coats of
approved synthetic enamel paint etc., complete with all leads and lifts.

DATA: Rope drum hoist for vertical lift barrage gate consists of hoist supporting frames, pulley
supports, pulleys, drive stool, rope drums, shafts, couplings, gears and pinions, plummer
blocks, gear box, electric motor, hand operation assembly, brake, wire rope, gate position
indicator, switch box etc. with related accessories.
Consider rope drum hoist for operating barrage gate for clear opening of 13.72 m x 8.26 m.
Details of material / Gas cutting / Welding considered for rate analysis are based on rope drum
hoist drawings for barrage gate of Hipparagi Barrage.
Generally the capacity of hoist required for barrage gate will be 1.5 times the weight of gate.
Weight of gate leaf in tonnes based on empirical formula :
Weight in tonnes = 0.0335 ( L^2 x H x h )^0.716

87
GATES AND HOISTS

Where ( L ) is length and ( H ) is height of gate and ( h ) is head of water above sill in Rm.
For vent opening of 13.72 x 8.26 m the approximate size of gate leaf will be 14.7 x 8.6 m.
Head of water above sill level considered : 8.26 m
Weight in tonnes = 0.0335 ( 14.7 x 14.7 x 8.6 x 8.26 ) ^ 0.716 : 33.289
Capacity of hoist with 25% reserve capacity : 1.5 x Weight of barrage gate
( Capacity of hoist to be rounded off to next 10 tonne ) : 1.5 x 33.289
: 49.933 tonnes
say : 50.00 tonnes
Weight of hoist with all accessories is assumed at 0.1 tonne per tonne capacity of hoist as the
hoist is supported on steel bridge and no anchorages and base frames are required.
Weight of hoist with all accessories ( 0.1 x 50 ) : 5.00 tonnes
The actual weight of barrage gate rope drum hoist as per data sheet : 5.069 t
Consider actual weight for data rate analysis.
1. Requirement of materials: as per fabrication drawings ( for details refer Item : 22 of Annexer )
a. Structural steel conforming to IS : 2062 :
Angles / Beams / Channels / Bars with 2.5 % wastage : 420.00 kg
Plates / Flats with 2.5 % wastage : 225.00 kg
b. Cast steel components conforming to IS : 1030 :
Rope drums 2 Nos / Gears : 1290.00 kg
Pinions : 98.00 kg
Pulleys 3 Nos / Couplings 2 Nos : 650.00 kg
Plummer blocks / Hubs : 250.00 kg
c. Alloy steel steel components conforming to IS : 1570 :
Shafts / Keys : 350.00 kg
Pins 96.00 kg
d. Alluminium/ Bronze alloy components conforming to IS : 305 :
Bearings / Bush : 100.00 kg
e. Bolt / Nut / Washers conforming to IS : 1363 :
MS Bolts / Nuts / Washers with 2.5 % wastage : 26.00 kg
f. Steel wire rope conforming ti IS 2266 :
28 mm dia 6 / 37 construction 1 No 120 Rm @ 2.71 kg / m : 435.00 kg
g. Other components :
Manual operation assembly : 1 No.
Worm reducer ( size 800 ) : 1 No
Electric motor 12.5 hp : 1 No.
Gate position indicator : 1 No.
Ele-magnetic brake : 1 No.
Electric cable / switch / control panel etc : 1 set
h. Welding electrodes :
Welding electrodes for stitch welding at 10 % of total with 2.5 % wastage : 44 Nos
Welding electrodes ( LH ) for run welding at 90 % of total with 2.5 % wastage : 392 Nos
2. Cutting :
Length of cutting assuming cutting for 2 sides : 37 Rm
Add for variations ( cutting for more than 2 sides / odd shapes etc ) at 10 % : 4 Rm
Total : 41 Rm
For cutting structural steel sections to required sizes gas cutting is assumed.
Length of steel to be cut by using gas manually : 20 m
Length of steel to be cut by gas using pug cutting machine : 21 m
Time for gas cutting manually assuming average cutting progress of 2 m / hour : 10 hours
Time for gas cutting by pug cutting machine at ( av ) 3 m / hour : 7 hours
Acetelyne gas @ 0.6 cum / hour ( 17 x 0.60 ) : 10 cum
Oxygen gas @ 1.8 cum / hour ( 17 x 1.80 ) : 30 cum
Use of gas cutting torch with 50 min / hr working ( 10 x 60 / 50 ) : 12 hours

88
GATES AND HOISTS

Use of pug cutting machine with 50 min / hr working ( 7 x 60 / 50 ) : 9 hours


3. Welding :
Length of welding : 53 Rm
For stich welding @ 2 hrs usage / shift & @ 15 electrodes / hr
( 44 / 15 ) x 8 / 2 : 12 hours
For run welding @ 6 hrs usage / shift & @ 15 electrodes / hr
( 392 / 15 ) x 8 / 6 : 35 hours
Total : 47 hours
Deploy welding transformer for 47 hours.
Fuel / Energy charges @ 25 % hrs for stitch welding & @ 75 % hrs for run welding.
( 12 x 0.25 + 35 x 0.75 ) : 30 hours
4. Surface cleaning and painting :
Painting area for rope drum hoist at 20 sqm / tonne of str steel : 13 sqm
2 coats of zinc chromate red oxide primer.
Quantity of primer paint for 13 sqm @ 12 sqm / ltr / coat : 2 ltr
3 coats of synthetic enamel paint.
Quantity of synthetic enamel paint for 13 sqm @ 12 sqm / ltr /coat : 3.5 ltr
As surface cleaning by sand blasting is hazardous, it is proposed to adopt chemical treatment
to remove grease, rust, scaling etc., and to form phasphate coating to prevent further rusting
before applying primer painting.
Quantity of rust cleaner / inhibitor at 8 sqm / ltr : 1.5 ltr
5. Requirement of other machinery :
For lifting and placing in position hoist drums, worm reducers, gears, floating shafts etc deploy
tower crane or other suitable lifting device for 2 hours.
For handling during fabrication and erection mobile derric crane for 10 hours considered.
For drilling holes for bolts 2 hours use of drilling machine considered.
For grinding and finishing weld joints 2 hours use of grinding machine considered
6. Requirement of work force :
Work component Foreman Marker / Gas cutter / Helper
Fabricator / Welder
Erector
Cutting sections/ drilling holes 23 hours 1 3 3 6
Fabricating by stitch welding 12 hours 1 2 --- 3
Run welding 35 hours 1 --- 5 5
Erection of hoist frame 1 1 --- 2
Erection of drums / gears / shafts 1 2 --- 4
Erection of pulleys / plummer blocks 1 2 --- 4
Erection of worm reducers / brake / motor 1 1 --- 2
Erection of other accessories 1 1 --- 2
Erection of control panel / cabling 1 1 --- 1
Checking and running without rope 1 1 --- 2
Rope fixing and checking 1 1 --- 2
Trial running by lowering / lifting gate 1 1 --- 2
Final checking / Finishing / cleaning 1 1 --- 1
Total : 13 17 8 36
Note : It is assumed that all stitch welding will be done by fabricator. Hence, no separate provision is
considered for welder for stitch welding.
For surface cleaning by chemical cleaner
and wire brushing at 15 sqm / day : 1 helpers for 13 sqm
For painting 2 coats primer and 3 coats
finishing paint at 20 sqm / day : 3 painter Cl-ll & 1 helper for 5 x 13 sqm
7. Excise duty on supply :
Excise duty is applicable on supply of fabricated parts. The cost of materials is inclusive of all
taxes/ duties. Therefore, for purpose of rate analysis 75 percent of total cost excluding the cost
of materials ( assuming 25 % erection cost ) is considered for assessing excise duty.

89
GATES AND HOISTS

8. Use rate of materials :


Cost of welding set @ Rs: 3375.00 / Each Rs: 3375.00
Life of welding set : 1000 hours
Use rate of welding set per hour ( cost / life ) Rs: 3.38
Cost of gas cutting set @ Rs: 1125.00 / Each Rs: 1125
Life of gas cutting set : 600 hours
Use rate of gas cutting set per hr ( cost / life ) Rs: 1.88

RATE ANALYSIS UNIT : 5.069 tonne wt


A. MATERIALS: 50.00 t capacity
Sl No Perticulars Unit Quantity Rate Amount
in Rs. in Rs.
1 Structural steel
Angles / beams / channels / bars kg 420.00 20.00 8400.00
Plates / flats kg 225.00 24.00 5400.00
2 Cast steel components :
Rope drums 2 Nos / Gears kg 1290.00 95.00 122550.00
Pinions kg 98.00 105.00 10290.00
Pulleys 3 Nos / Couplings 2 Nos kg 650.00 85.00 55250.00
Plummer blocks / Hubs kg 250.00 85.00 21250.00
3 Alloy steel components
Shafts / Keys kg 350.00 145.00 50750.00
Pins kg 96.00 175.00 16800.00
4 Bronze alloy components :
Bronze bearings / bush kg 100.00 380.00 38000.00
5 Wire rope 28 mm dia 6/37 construction kg 435.00 75.00 32625.00
6 MS Bolt / Nut / Washer kg 26.00 45.00 1170.00
7 Worm reducers No. 1.00 45000.00 45000.00
8 Electric motor 12.5 hp No. 1.00 16875.00 16875.00
9 Manual operating system No. 1.00 8437.50 8437.50
10 Gate position indicator No. 1.00 8437.50 8437.50
11 Ele-magnetic brake No. 1.00 8437.50 8437.50
12 Electric cable / switch / control panel etc LS 1.00 9000.00 9000.00
13 Oxygen gas cum 30.00 40.00 1200.00
14 Acetyline gas cum 10.00 185.00 1850.00
15 Welding electrodes Nos 44.00 4.00 176.00
16 Welding electrodes ( LH ) Nos 392.00 6.00 2352.00
17 Zinc chromate red oxide primer ltr 2.00 140.00 280.00
18 Synthetic enamel ( 1st quality ) paint ltr 3.50 140.00 490.00
19 Rust cleaner / inhibitor ltr 1.50 175.00 262.50
20 Grease kg 50.00 90.00 4500.00
21 Use rate welding holder set Hour 47.00 3.38 158.63
22 Use rate gas cutting torch set Hour 12.00 1.88 22.50
23 Wire brush Nos 1.00 25.00 25.00
24 Sundries LS 25.00 22.50 562.50
TOTAL Rs: 470551.63
Add for small Tools and Plants @ 1% Rs: 4705.52
Add for Contractor' Profit @ 10% Rs: 47055.16
Add for Contrators' Overheads @ 5% Rs: 23527.58
Total cost of Materials Rs: 545839.89

90
GATES AND HOISTS

B. MACHINERY:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Welding transformer Hour 47.00 9.00 423.00
Fuel / Energy charges Hour 47.00 49.00 2303.00
2 Tower crane 5 t capacity Hour 2.00 763.00 1526.00
Fuel / Energy charges Hour 2.00 106.00 212.00
3 Pug cutting machine Hour 9.00 13.00 117.00
Fuel / Energy charges Hour 9.00 2.00 18.00
4 Mobile derric crane Hour 10.00 261.00 2610.00
Fuel / Energy charges Hour 10.00 117.00 1170.00
5 Grinding machine Hour 2.00 15.00 30.00
Fuel / Energy charges Hour 2.00 20.00 40.00
6 Drilling machines Hour 2.00 15.00 30.00
Fuel / Energy charges Hour 2.00 20.00 40.00
7 Sundries LS 25.00 22.50 562.50
TOTAL Rs: 9081.50
Add for small Tools and Plants @ 1% Rs: 90.82
Add for Contractor' Profit on DPOL / Energy @ 10% Rs: 434.55
Add for Contrators' Overheads @ 5% Rs: 454.08
Total hire charges of Machinery Rs: 10060.94

C. LABOUR:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Crew for Mobile crane Hour 10.00 32.90 329.00
2 Crew for Tower crane Hour 2.00 36.05 72.10
3 Crew for Drilling machine Hour 2.00 35.00 70.00
4 Crew for Grinding machine Hour 2.00 35.00 70.00
5 Foreman Day 13.00 108.65 1412.45
6 Marker / Fabricator / Erector Day 17.00 93.70 1592.90
7 Gas cutter Day 3.00 93.70 281.10
8 Welder ( General ) Day 5.00 93.70 468.50
9 Khalasi Day 4.00 83.65 334.60
10 Helper fabrication / erection Day 36.00 81.60 2937.60
11 Helper for cleaning / painting Day 2.00 81.60 163.20
12 Painter Cl - II Day 3.00 81.60 244.80
13 Electrician Day 2.00 82.65 165.30
TOTAL Rs: 8141.55
Add for small Tools and Plants @ 1% Rs: 81.42
Add for Contractor' Profit @ 10% Rs: 814.16
Add for hidden cost on Labour @ 15% Rs: 1221.23
Add for additional hidden cost on labour @ 10% Rs: 814.16
Add for Contrators' Overheads @ 5% Rs: 407.08
Total cost of Labour Rs: 11479.59

ABSTRACT:
A. Cost of Materials Rs: 545839.89
B. Hire charges of Machinery Rs: 10060.94
C. Cost of Labour Rs: 11479.59
Total Rs: 567380.41
Add for excise duty on 75 percent cost
excluding cost of materials @ 18.00% Rs: 2907.97
Add for insurance charges @ 1.00% Rs: 5673.80
Add for designs and drawings @ 2.5% Rs: 14184.51

91
GATES AND HOISTS

Add for zigs / supports / winches / chain-pulley @ 2.5% Rs: 14184.51


Add for power supply arrangements @ 2.5% Rs: 14184.51
Add for enabling works @ 2% Rs: 11347.61
Total Rs: 629863.32
Add for 2 rehandling leads for 1 km including loading and unloading :
Fabricated parts 2x5.069 tonnes @ Rs: 81.30 / tonne Rs: 824.22
Add for transportation upto work site @ 3% Rs: 18895.90
Total cost for 5.069 tonne wt Rs: 649583.44
50.000 t capacity
Rate per tonne wt Rs: 128150.00
Rate per tonne capacity of hoist Rs: 12990.00

SECTION: GATE / HOIST & ALLIED WORKS. YEAR: 2003-2004 ITEM No: 23

ITEM: Design, fabrication, supply, erection and commissioning of embedded parts consisting of sill
beam, wall plates, first stage anchors, anchor girders, anchor bars, trunnion supports etc., with
all accessories for canal regulator radial gates including cost of all materials, labour,
machinery, cutting, aligning, anchoring, welding, finishing, cleaning, applying one coat of zinc
rich epoxy primer and four coats of cold applied coal tar epoxy paint etc., complete as per
specifications and approved drawings with all leads and lifts.

DATA: Embedded parts for radial gate consist of sill beam / wall plates / anchor girders / anchor bars /
trunnion supports etc., with all accessories. The weight of embedded parts for small radial gate
will be generally at about 50 to 60 percent of weight of radial gate leaf.
Consider embedded parts for radial gate for canal cross regulator opening of size 3 m x 3.7 m.
Details of material / Gas cutting / Welding considered for rate analysis are based on embedded
parts drawings for radial gate of UKP - ALBC Cross regulator.
Weight of embedded parts in tonne for canal regulator opening based on empirical formula :
Weight of embedded parts in tonnes = 0.092 x ( L^2 x H x h )^0.673
Where ( L ) is length and ( H ) is height and ( h ) is head of water in metres.
= 0.092 x ( 3 x 3 x 3.9 x 3.7 ) ^ 0.673 : 2.433
The actual weight of embedded parts as per data sheet : 2.404 tonnes
Consider actual weight for data rate analysis.
1. Requirement of materials: as per fabrication drawings ( for details refer Item : 23 of Annexer )
a. Structural steel conforming ti IS : 2062 :
Structural steel angles / beams / channels / bars with 2.5 % wastage : 832 kg
Structural steel plates / flats with 2.5 % wastage : 1512 kg
b. Alloy steel conforming to IS : 1570 :
Stainless steel plates / flats : 53.00 kg
c. Bolt / Nut / Washer conforming to IS : 1363 :
MS bolts and nuts with 2.5 % wastage : 67 kg
d. Welding electrodes :
Welding electrodes for stitch welding at 10 % of total with 2.5 % wastage : 120 Nos
Welding electrodes (SS) for stitch welding at 10 % of total with 2.5 % wastage : 16 Nos
Welding electrodes ( LH ) for run welding at 90 % of tota with 2.5 % wastage : 920 Nos
Welding electrodes ( SS ) for run welding at 90 % of tota with 2.5 % wastage : 144 Nos
2. Cutting :
Length of cutting assuming cutting for 2 sides : 97.00 Rm
Add for variations ( cutting for more than 2 sides / odd shapes etc ) at 10 % : 10.00 Rm
Total : 107.00 Rm
For cutting structural steel sections to required sizes gas cutting is assumed.
Length of steel to be cut by using gas manually : 40 m
Length of steel to be cut by gas using pug cutting machine : 67 m
Time for gas cutting manually assuming average cutting progress of 2 m / hour : 20 hours

92
GATES AND HOISTS

Time for gas cutting by pug cutting machine at ( av ) 3 m / hour : 22 hours


Acetelyne gas @ 0.6 cum / hour ( 42 x 0.60 ) : 25 cum
Oxygen gas @ 1.8 cum / hour ( 42 x 1.80 ) : 75 cum
Use of gas cutting torch with 50 min / hr working ( 20 x 60 / 50 ) : 24 hours
Use of pug cutting machine with 50 min / hr working ( 22 x 60 / 50 ) : 26 hours
3. Welding :
Length of welding : 142 m
For stich welding @ 2 hrs usage / shift & @ 15 electrodes / hr
( 120 + 16 ) x 8 / 15 / 2 : 36 hours
For run welding @ 6 hrs usage / shift & @ 15 electrodes / hr
( 920 + 144 ) x 8 / 15 / 6 : 95 hours
Total : 131 hours
Deploy welding transformer for 131 hours.
Fuel / Energy charges @ 25 % hrs for stitch welding & @ 75 % hrs for run welding.
( 36 x 0.25 + 95 x 0.75 ) : : 80 hours
4. Planing SS plates for seal seats :
For surface finishing of SS plates for wheel / seal tracks planing machine is considered.
Length of SS plate for surface finishing by planing machine : 13.3 Rm
Length of planing at a time for 4 m stroke planing machine : 3 Rm
Time for planing 3 m length section with 50 min / hour working : 8 hours
Time for planing 13.3 m SS plates ( 13.3 x 8 / 3 ) : 36 hours
5. Surface cleaning and painting :
Painting area for embedded parts at 5 sqm / tonne : 12 sqm
1 coat of zinc rich epoxy primer 40 micron dry film each coat.
Quantity of primer paint for 12 sqm @ 9 sqm / ltr / coat : 1.5 ltr
4 coats of coal tar epoxy paint 100 micron dry film each coat.
Quantity of coal tar epoxy paint for 12 sqm @ 6 sqm / ltr / coat : 8 ltr
As surface cleaning by sand blasting is hazardous, it is proposed to adopt chemical treatment
to remove grease, rust, scaling etc., and to form phasphate coating to prevent further rusting
before applying primer painting.
Quantity of rust cleaner / inhibitor at 8 sqm / ltr : 1.5 ltr
6. Requirement of other machinery :
For drilling holes for anchor bolts 8 hours use of drilling machine considered.
For finishing weld joints / edges 8 hours use of grinding machine considered.
For handling of parts during fabrication and erection use of mobile derric crane for 4 hours and
stationery derric crane for 8 hours considered.
7. Requirement of work force :
Work component Foreman Marker / Gas cutter / Helper
Fabricator / Welder
Erector
Cutting sections 50 hours 3 6 6 12
Drilling holes for anchors / supports --- 1 --- 1
Fabricating by stitch welding 36 hours 2 4 --- 8
Run welding 95 hours 1 --- 12 12
Erection of Anchor girders / anchor bars 2 4 --- 8
Erection of first stage anchors --- 2 --- 2
Erection of Sill beam / Wall plates 1 1 --- 2
Finishing / Checking 1 1 --- 1
Total : 10 19 18 46
Note : It is assumed that all stitch welding will be done by fabricator. Hence, no separate provision is
considered for welder for stitch welding.
For surface cleaning by chemical cleaner
and wire brushing at 15 sqm / day : 1 helper for 12 sqm.
For painting 1 coat primer and 4 coats
finishing paint at 15 sqm / day : 4 painter Cl-ll & 1 helper for 5 x 12 sqm.

93
GATES AND HOISTS

For surface finishing of stainless steel plates for seal seats planing machine is considered.
8. Excise duty on supply :
Excise duty is applicable on supply of fabricated parts. The cost of materials is inclusive of all
taxes/ duties. Therefore, for purpose of rate analysis 75 percent of total cost excluding the cost
of materials ( assuming 25 % erection cost ) is considered for assessing excise duty.
9. Use rate of materials :
Cost of welding set @ Rs: 3375.00 / Each Rs: 3375.00
Life of welding set : 1000 hours
Use rate of welding set per hour ( cost / life ) Rs: 3.38
Cost of gas cutting set @ Rs: 1125.00 / Each Rs: 1125
Life of gas cutting set : 600 hours
Use rate of gas cutting set per hr ( cost / life ) Rs: 1.88

RATE ANALYSIS UNIT : 2.404 tonne


A. MATERIALS:
Sl No Perticulars Unit Quantity Rate Amount
in Rs. in Rs.
1 Str steel angle / beam / channel / bars kg 832.00 20.00 16640.00
2 Structural steel plate / flats kg 1512.00 24.00 36288.00
3 Stainless steel plate / flats kg 53.00 90.00 4770.00
4 MS bolts and nuts kg 67.00 45.00 3015.00
5 Oxygen gas cum 75.00 40.00 3000.00
6 Acetyline gas cum 25.00 185.00 4625.00
7 Welding electrodes Nos 120.00 4.00 480.00
8 Welding electrodes ( LH ) Nos 920.00 6.00 5520.00
9 Welding electrodes ( stainless steel ) Nos 160.00 35.00 5600.00
10 Zinc rich epoxy primer ltr 1.50 525.00 787.50
11 Coal tar epoxy paint ltr 8.00 131.00 1048.00
12 Rust cleaner / inhibitor ltr 1.50 175.00 262.50
13 Use rate welding holder set Hour 131.00 3.38 442.13
14 Use rate gas cutting torch set Hour 24.00 1.88 45.00
15 Wire brush Nos 1.00 25.00 25.00
16 Sundries LS 10.00 22.50 225.00
TOTAL Rs: 82773.13
Add for small Tools and Plants @ 1% Rs: 827.73
Add for Contractor' Profit @ 10% Rs: 8277.31
Add for Contrators' Overheads @ 5% Rs: 4138.66
Total cost of Materials Rs: 96016.83

B. MACHINERY:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Welding transformer Hour 131.00 9.00 1179.00
Fuel / Energy charges Hour 80.00 49.00 3920.00
2 Pug cutting machine Hour 26.00 13.00 338.00
Fuel / Energy charges Hour 26.00 2.00 52.00
3 Planing machine Hour 36.00 66.00 2376.00
Fuel / Energy charges Hour 36.00 61.00 2196.00
4 Mobile derric crane Hour 4.00 261.00 1044.00
Fuel / Energy charges Hour 4.00 117.00 468.00
5 Stationery derric crane Hour 8.00 50.00 400.00
Fuel / Energy charges Hour 8.00 5.00 40.00
6 Grinding machine Hour 8.00 15.00 120.00
Fuel / Energy charges Hour 8.00 20.00 160.00

94
GATES AND HOISTS

7 Drilling machines Hour 8.00 15.00 120.00


Fuel / Energy charges Hour 8.00 20.00 160.00
8 Sundries LS 10.00 22.50 225.00
TOTAL Rs: 12798.00
Add for small Tools and Plants @ 1% Rs: 127.98
Add for Contractor' Profit on DPOL / Energy @ 10% Rs: 722.10
Add for Contrators' Overheads @ 5% Rs: 639.90
Total hire charges of Machinery Rs: 14287.98

C. LABOUR:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Crew for Mobile crane Hour 4.00 32.90 131.60
2 Crew for Planing machine Hour 36.00 42.75 1539.00
3 Crew for Drilling machine Hour 8.00 35.00 280.00
4 Crew for Grinding machine Hour 8.00 35.00 280.00
5 Foreman Day 10.00 108.65 1086.50
6 Marker / Fabricator / Erector Day 19.00 93.70 1780.30
7 Gas cutter Day 6.00 93.70 562.20
8 Welder ( General ) Day 10.00 93.70 937.00
9 Welder ( X - ray ) Day 2.00 103.07 206.14
10 Helper fabrication / erection Day 46.00 81.60 3753.60
11 Helper for cleaning / painting Day 2.00 81.60 163.20
12 Painter Cl - II Day 4.00 81.60 326.40
13 Electrician Day 1.00 82.65 82.65
TOTAL Rs: 11128.59
Add for small Tools and Plants @ 1% Rs: 111.29
Add for Contractor' Profit @ 10% Rs: 1112.86
Add for hidden cost on Labour @ 15% Rs: 1669.29
Add for additional hidden cost on labour @ 10% Rs: 1112.86
Add for Contrators' Overheads @ 5% Rs: 556.43
Total cost of Labour Rs: 15691.31

ABSTRACT:
A. Cost of Materials Rs: 96016.83
B. Hire charges of Machinery Rs: 14287.98
C. Cost of Labour Rs: 15691.31
Total Rs: 125996.12
Add for excise duty on 75 percent cost
excluding cost of materials @ 18.00% Rs: 4047.20
Add for insurance charges @ 1.00% Rs: 1259.96
Add for designs and drawings @ 2.5% Rs: 3149.90
Add for zigs / supports / winches / chain-pulley @ 2.5% Rs: 3149.90
Add for power supply arrangements @ 2.5% Rs: 3149.90
Add for enabling works @ 2% Rs: 2519.92
Total Rs: 143272.91
Add for 2 rehandling leads for 1 km including loading and unloading :
Fabricated parts 2x2.404 tonnes @ Rs: 81.30 / tonne Rs: 390.89
Add for transportation upto work site @ 3% Rs: 4298.19
Total cost for 2.404 tonne Rs: 147961.99
Rate per tonne Rs: 61550.00

95
GATES AND HOISTS

SECTION: GATE / HOIST & ALLIED WORKS. YEAR: 2003-2004 ITEM No: 24

ITEM: Design, fabrication, supply, erection, testing and commissioning of radial gate consisting
of skin plate, stiffeners, horizontal girders, sector arms, trunnion assemblies, tie beam, pulley
supports, bracings, rubber seals, seal clamps etc., with all accessories for canal regulator
including cost of all materials, machinery, labour, cutting, bending, aligning, anchoring, welding,
finishing, cleaning, applying one coat of zinc rich epoxy primer and three coats of cold applied
coal tar epoxy paint, seal fixing etc., complete as per specifications and approved drawings
with all leads and lifts.

DATA: Regulator radial gate consists of trunnions / sector arms / horizontal girders / Tee- supports /
skin plate / tie beam / bracings for horizontal girders and sector arms / pulley blocks / seals
with all accessories.
Sector arms are connected to trunions by bolts and nuts.
Horizontal girders generally spaced at about 3 m apart are joined to sector arms by welding and
are stiffened by vertical and diagonal stiffeners to form the main frame. Tee- sections are welded
to horizontal girders to make the frame regid and to support the skin plate. Skin plate is welded
to Tee-supports generally spaced vertically at about 40 cm apart.
Consider radial gate for canal cross regulator opening of size 3 m x 3.7 m for analysis.
Details of material / Gas cutting / Welding considered for rate analysis are based on radial gate
drawings of UKP - ALBC Cross regulator.
Weight of gate leaf in tonne for 3 m x 3.7 m opening based on empirical formula :
Weight of gate in tonnes = 0.1685 x ( L^2 x H x h )^0.673
Where ( L ) is length and ( H ) is height and ( h ) is head of water in metres.
= 0.1685 x ( 3^2 x 3.9 x 3.7 )^0.673 : 4.456
The actual weight of radial gate leaf as per data sheet : 4.455 tonnes
Consider actual weight for data rate analysis.
1. Requirement of materials: as per fabrication drawings ( for details refer Item : 24 of Annexer )
Structural steel :
Structural steel angles / beams / channels / bars with 2.5 % wastage : 2215 kg
Structural steel plates / flats with 2.5 % wastage : 2093 kg
Alloy steel components :
Pins : 41 kg
Cast steel components :
Trunnion hub / Guide roller : 122 kg
Alluminium / Bronze alloy components :
Trunnion / Guide roller bush : 19 kg
Bolts / Nuts / Washers :
GI bolts / nuts / washers with 2.5 % wastage : 16.5 kg
MS bolts / nuts / washers with 2.5 % wastage : 55 kg
Zinc at 20 kg / trunnion ( 2 x 20 ) : 40 kg
Rubber seal :
Bottom seal ( flat type ) : 3.1 Rm
Side seals ( Z - type ) : 10.2 Rm
Welding electrodes for stitch welding at 10 % of total with 2.5 % wastage : 168 Nos
Welding electrodes ( LH ) for run welding at 90 % of total with 2.5 % wastage : 1515 Nos
2. Cutting :
Total length of cutting assuming cutting for 2 sides : 108 Rm
Add for variations ( cutting for more than 2 sides / odd shapes etc ) at 10 % : 11 Rm
Total : 119 Rm
For cutting structural steel sections to required sizes gas cutting is assumed.
Length of steel to be cut by using gas manually : 60 m
Length of steel to be cut by gas using pug cutting machine : 59 m
Time for gas cutting manually assuming average cutting progress of 2 m / hour : 30 hours
Time for gas cutting by pug cutting machine at ( av ) 3 m / hour : 20 hours

96
GATES AND HOISTS

Acetelyne gas @ 0.6 cum / hour ( 50 x 0.60 ) : 30 cum


Oxygen gas @ 1.8 cum / hour ( 50 x 1.80 ) : 90 cum
Use of gas cutting torch with 50 min / hr working ( 30 x 60 / 50 ) : 36 hours
Use of pug cutting machine with 50 min / hr working ( 20 x 60 / 50 ) : 24 hours
3. Bending machine:
Assuming 1.5 m wide plates, length of plate for bending ( 3 x 5 / 1.5 ) : 10.00 m
Length of Tee sections : 30.00 m
Length of side seal cover angles (5x2) : 10.00 m
Total : 50.00 m
Assuming 3 m bending / hour, time for bending 50 m ( 50 / 3 ) : 17 hours
With 50 minutes / hour working deploy bending machine for : 20 hours
4. Welding :
Length of welding : 196 Rm
For stich welding @ 2 hrs usage / shift & @ 12 electrodes / hr
( 168 / 12 ) x 8 / 2 : 56 hours
For run welding @ 6 hrs usage / shift & @ 12 electrodes / hr
( 1515 / 12 ) x 8 / 6 : 168 hours
Total : 224 hours
Deploy welding transformer for 224 hours.
Fuel / Energy charges @ 25 % hrs for stitch welding & @ 75 % hrs for run welding.
( 56 x 0.25 + 168 x 0.75 ) : 140 hours
5. Surface cleaning and painting :
Painting area for radial gate at 20 sqm / tonne : 89 sqm
1 coat of zinc rich epoxy primer 40 micron dry film each coat.
Quantity of primer paint for 89 sqm @ 9 sqm / ltr / coat : 10 ltr
3 coats of coal tar epoxy paint 100 micron dry film each coat.
Quantity of coal tar epoxy paint for 89 sqm @ 6 sqm / ltr / coat : 45 ltr
As surface cleaning by sand blasting is hazardous, it is proposed to adopt chemical treatment
to remove grease, rust, scaling etc., and to form phasphate coating to prevent further rusting
before applying primer painting.
Quantity of rust cleaner / inhibitor at 8 sqm / ltr : 11 ltr
6. Requirement of other machinery :
For drilling holes in skin plate and seal clamps for seal fixing 16 hours use of drilling machine
considered.
For grinding and finishing weld joints in skin plate and other locations 8 hours use of grinding
machine considered.
For handling of parts during fabrication and erection use of mobile derric crane for 10 hours and
stationery derric crane 20 hours considered.
7. Requirement of work force :
Work component Foreman Marker / Gas cutter / Helper
Fabricator / Welder
Erector
Cutting sections 60 hours 4 8 8 16
Bending sections 20 hours 1 2 --- 4
Drilling holes for seal fixing 1 2 --- 2
Fabricating by stitch welding 56 hours 3 7 --- 14
Run welding 168 hours 2 --- 21 21
Erection of trunnion and tie beam 1 2 --- 4
Erection of H -girders / Sector arms 1 2 --- 4
Erection of vertical stiffeners 1 2 --- 4
Erection of skin plates 1 2 --- 4
Erection of bracings / Zinc filling 1 2 --- 4
Seal fixing 1 2 --- 2
Finishing / checking / cleaning 1 1 --- 1
Total : 18 32 29 80

97
GATES AND HOISTS

Note : It is assumed that all stitch welding will be done by fabricator. Hence, no separate provision is
considered for welder for stitch welding.
For surface cleaning by chemical cleaner
and wire brushing at 15 sqm / day : 6 helper for 89 sqm
For painting 1 coat primer and 3 coats
finishing paint at 15 sqm / day : 24 painter Cl-ll & 6 helper for 4x89 sqm
8. Excise duty on supply :
Excise duty is applicable on supply of fabricated parts. The cost of materials is inclusive of all
taxes/ duties. Therefore, for purpose of rate analysis 75 percent of total cost excluding the cost
of materials ( assuming 25 % erection cost ) is considered for assessing excise duty.
9. Use rate of materials :
Cost of welding set @ Rs: 3375.00 / Each Rs: 3375.00
Life of welding set : 1000 hours
Use rate of welding set per hour ( cost / life ) Rs: 3.38
Cost of gas cutting set @ Rs: 1125.00 / Each Rs: 1125
Life of gas cutting set : 600 hours
Use rate of gas cutting set per hr ( cost / life ) Rs: 1.88

RATE ANALYSIS UNIT : 4.455 tonne


A. MATERIALS:
Sl No Perticulars Unit Quantity Rate Amount
in Rs. in Rs.
1 Structural steel
Angles / beams / channels / bars kg 2215.00 20.00 44300.00
Plates / flats kg 2093.00 24.00 50232.00
2 Cast steel components
Trunnion hubs / Guide rollers kg 122.00 85.00 10370.00
3 Alloy steel components
Trunnion pins kg 41.00 175.00 7175.00
4 Alluminium / Bronze alloy components
Bush for Trunnion / Guide roller kg 19.00 380.00 7220.00
5 Bolt / Nut / Washer
GI bolts / nuts / washers kg 16.50 60.00 990.00
MS bolts / nuts / washers kg 55.00 45.00 2475.00
6 Zinc for trunnion seating kg 40.00 100.00 4000.00
7 Rubber seals
Bottom seal Rm 3.10 120.00 372.00
Side seals Rm 10.20 240.00 2448.00
8 Oxygen gas cum 90.00 40.00 3600.00
9 Acetyline gas cum 30.00 185.00 5550.00
10 Welding electrodes Nos 168.00 4.00 672.00
11 Welding electrodes ( LH ) Nos 1515.00 6.00 9090.00
12 Zinc rich epoxy primer ltr 10.00 525.00 5250.00
13 Coal tar epoxy paint ltr 45.00 131.00 5895.00
14 Rust cleaner / inhibitor ltr 11.00 175.00 1925.00
15 Use rate welding holder set Hour 224.00 3.38 756.00
16 Use rate gas cutting torch set Hour 36.00 1.88 67.50
17 Wire brush Nos 2.00 25.00 50.00
18 Sundries LS 25.00 22.50 562.50
TOTAL Rs: 163000.00
Add for small Tools and Plants @ 1% Rs: 1630.00
Add for Contractor' Profit @ 10% Rs: 16300.00
Add for Contrators' Overheads @ 5% Rs: 8150.00
Total cost of Materials Rs: 189080.00

98
GATES AND HOISTS

B. MACHINERY:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Welding transformer Hour 224.00 9.00 2016.00
Fuel / Energy charges Hour 140.00 49.00 6860.00
2 Pug cutting machine Hour 24.00 13.00 312.00
Fuel / Energy charges Hour 24.00 2.00 48.00
3 Bending machine Hour 20.00 31.00 620.00
Fuel / Energy charges Hour 20.00 61.00 1220.00
4 Mobile derric crane Hour 10.00 261.00 2610.00
Fuel / Energy charges Hour 10.00 117.00 1170.00
5 Stationery derric crane Hour 20.00 50.00 1000.00
Fuel / Energy charges Hour 20.00 5.00 100.00
6 Grinding machine Hour 8.00 15.00 120.00
Fuel / Energy charges Hour 8.00 20.00 160.00
7 Drilling machines Hour 16.00 15.00 240.00
Fuel / Energy charges Hour 16.00 20.00 320.00
8 Sundries LS 25.00 22.50 562.50
TOTAL Rs: 17358.50
Add for small Tools and Plants @ 1% Rs: 173.59
Add for Contractor' Profit on DPOL / Energy @ 10% Rs: 1044.05
Add for Contrators' Overheads @ 5% Rs: 867.93
Total hire charges of Machinery Rs: 19444.06

C. LABOUR:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Crew for Mobile crane Hour 10.00 32.90 329.00
2 Crew for Bending machine Hour 20.00 26.70 534.00
3 Crew for Drilling machine Hour 16.00 35.00 560.00
4 Crew for Grinding machine Hour 8.00 35.00 280.00
5 Foreman Day 18.00 108.65 1955.70
6 Marker / Fabricator / Erector Day 32.00 93.70 2998.40
7 Gas cutter Day 8.00 93.70 749.60
8 Welder ( General ) Day 19.00 93.70 1780.30
9 Welder ( X - ray ) Day 2.00 103.07 206.14
10 Helper fabrication / erection Day 80.00 81.60 6528.00
11 Helper for cleaning / painting Day 12.00 81.60 979.20
12 Painter Cl - II Day 24.00 81.60 1958.40
13 Electrician Day 3.00 82.65 247.95
TOTAL Rs: 19106.69
Add for small Tools and Plants @ 1% Rs: 191.07
Add for Contractor' Profit @ 10% Rs: 1910.67
Add for hidden cost on Labour @ 15% Rs: 2866.00
Add for additional hidden cost on labour @ 10% Rs: 1910.67
Add for Contrators' Overheads @ 5% Rs: 955.33
Total cost of Labour Rs: 26940.43

ABSTRACT:
A. Cost of Materials Rs: 189080.00
B. Hire charges of Machinery Rs: 19444.06
C. Cost of Labour Rs: 26940.43
Total Rs: 235464.49
Add for excise duty on 75 percent cost
excluding cost of materials @ 18.00% Rs: 6261.91

99
GATES AND HOISTS

Add for insurance charges @ 1.00% Rs: 2354.64


Add for designs and drawings @ 2.5% Rs: 5886.61
Add for zigs / supports / winches / chain-pulley @ 2.5% Rs: 5886.61
Add for power supply arrangements @ 2.5% Rs: 5886.61
Add for enabling works @ 2% Rs: 4709.29
Total Rs: 266450.17
Add for 2 rehandling leads for 1 km including loading and unloading :
Fabricated parts 2x4.455 tonnes @ Rs: 81.30 / tonne Rs: 724.38
Add for transportation upto work site @ 3% Rs: 7993.51
Total cost for 4.455 tonne Rs: 275168.06
Rate per tonne Rs: 61770.00

SECTION: GATE / HOIST & ALLIED WORKS. YEAR: 2003-2004 ITEM No: 25

ITEM: Design, fabrication, supply, erection, testing and commissioning of adequate capacity
electrically operated rope drum hoist consisting of hoist platform, rope drum, gear
system, electric motor, electro- magnetic brake system, control panel, wire rope, ladder etc.,
with all accessories for operating canal regulator radial gate including cost of all materials,
machinery, labour, cutting, bending, aligning, anchoring, welding, finishing, cleaning, applying
two coats of zinc chromate red oxide primer and three coats of approved synthetic enamel
paint etc., complete with all leads and lifts.

DATA: Rope drum hoist for radial gate consists of embedded parts for anchorage, hoist supporting
structure, pulley supporting structures, pulleys, drive stool, rope drums, couplings, shafts,
gears and pinions, plummer blocks, worm reducer, floating shaft, electric motor, hand operation
assembly, brake, wire rope, gate position indicator, switch box etc. with related accessories.
Consider rope drum hoist for radial gate for canal regulator opening of size 3 m x 3.7 m.
Details of material / Gas cutting / Welding considered for rate analysis are based on rope drum
hoist drawings for radial gate of UKP - ALBC Cross regulator.
Generally the capacity of rope drum hoist for small radial gate will be about 2 times the weight
of radial gate.
Weight of gate leaf in tonne for 3 m x 3.7 m spillway opening based on empirical formula :
Weight of gate in tonnes = 0.1685 x ( L^2 x H x h )^0.673
Where ( L ) is length and ( H ) is height and ( h ) is head of water in metres.
= 0.1685 x ( 3^2 x 3.9 x 3.7 )^0.673 : 4.456
Capacity of hoist required in tonnes with 25% reserve capacity : 2 x Wt of gate
( Capacity of hoist to be rounded off to next 5 tonne ) ( 2 x 4.456 ) : 8.912 tonnes
say : 10 tonnes
Actual capacity of hoist as per data : 10 tonnes
Weight of hoist with all accessories is assumed at 0.3 tonne per tonne capacity of hoist.
Weight of hoist with all accessories ( 0.30 x 10 ) : 3.000 tonnes
The actual weight of regulator radial gate rope drum hoist as per data sheet : 3.002 tonnes
Consider actual weight for data rate analysis.
1. Requirement of materials: as per fabrication drawings ( for details refer Item : 25 of Annexer )
a. Structural steel conforming to IS : 2062 :
Angles / Beams / Channels / Bars with 2.5 % wastage : 1269 kg
Plates / Flats with 2.5 % wastage : 544 kg
Chequered plate 195 kg
b. Cast steel components conforming to IS : 1030 :
Rope drums 2 Nos / Gears : 384 kg
Pinions : 14 kg
Pulleys 6 Nos : 108 kg
Plummer blocks / Hubs : 47 kg

100
GATES AND HOISTS

c. Alloy steel components conforming to IS : 1570 :


Shafts : 75 kg
Pins 24 kg
d. Alluminium/ Bronze alloy components conforming to IS : 305 :
Bearings / Bush : 11 kg
e. Bolt / Nut / Washers conforming to IS : 1363 :
MS Bolts / Nuts / Washers with 2.5 % wastage : 68 kg
f. Steel wire rope conforming to IS : 2266 :
12 mm dia 6 / 36 construction 2 Nos 35 m each @ 0.6 kg / Rm : 42 kg
g. Other components :
Manual operating system : 1 No.
Worm reducers : 1 No.
Electric motor 2 hp : 1 No.
Ele-magnetic brake : 1 No.
Wire rope sockets : 2 Nos
MS pipe 32 mm dia : 10.5 Rm
Electric cable / switch / control panel etc : 1 set
h. Welding electrodes :
Welding electrodes for stitch welding at 10 % of total with 2.5 % wastage : 79 Nos
Welding electrodes ( LH ) for run welding at 90 % of total with 2.5 % wastage : 712 Nos
2. Cutting :
Length of cutting assuming cutting for 2 sides : 86 Rm
Add for variations ( cutting for more than 2 sides / odd shapes etc ) at 10 % : 9 Rm
Total : 95 Rm
For cutting structural steel sections to required sizes gas cutting is assumed.
Length of steel to be cut by using gas manually : 78 Rm
Length of steel to be cut by gas using pug cutting machine : 17 Rm
Time for gas cutting manually assuming average cutting progress of 2 m / hour : 39 hours
Time for gas cutting by pug cutting machine at ( av ) 3 m / hour : 6 hours
Acetelyne gas @ 0.6 cum / hour ( 45 x 0.60 ) : 27 cum
Oxygen gas @ 1.8 cum / hour ( 45 x 1.80 ) : 81 cum
Use of gas cutting torch with 50 min / hr working ( 39 x 60 / 50 ) : 47 hours
Use of pug cutting machine with 50 min / hr working ( 6 x 60 / 50 ) : 7 hours
3. Welding :
Length of welding : 130 Rm
For stich welding @ 2 hrs usage / shift & @ 15 electrodes / hr
( 79 / 15 ) x 8 / 2 : 21 hours
For run welding @ 6 hrs usage / shift & @ 15 electrodes / hr
( 712 / 15 ) x 8 / 6 : 63 hours
Total : 84 hours
Deploy welding transformer for 84 hours.
Fuel / Energy charges @ 25 % hrs for stitch welding & @ 75 % hrs for run welding.
( 21 x 0.25 + 63 x 0.75 ) : 53 hours
4. Surface cleaning and painting :
Painting area at 20 sqm / t of str steel ( 1.96x20 ) : 39 sqm
2 coats of zinc chromate red oxide primer.
Quantity of primer paint for 39 sqm @ 12 sqm / ltr / coat : 6.5 ltr
3 coats of synthetic enamel paint.
Quantity of synthetic enamel paint for 39 sqm @ 12 sqm / ltr / coat : 10 ltr
As surface cleaning by sand blasting is hazardous, it is proposed to adopt chemical treatment
to remove grease, rust, scaling etc., and to form phasphate coating to prevent further rusting
before applying primer painting.
Quantity of rust cleaner / inhibitor at 8 sqm / ltr : 5 ltr
5. Requirement of other machinery :
For handling of parts during fabrication and erection use of mobile derric crane for 4 hours and

101
GATES AND HOISTS

stationery derric crane for 8 hours considered.


For drilling holes for bolts 16 hours use of drilling machine considered.
For grinding and finishing weld joints 8 hours use of grinding machine considered
6. Requirement of work force :
Work component Foreman Marker / Gas cutter / Helper
Fabricator / Welder
Erector
Cutting sections 54 hours 3 7 7 14
Drilling holes for pins / bolts fixing 1 1 --- 1
Fabricating by stitch welding 21 hours 2 3 --- 6
Run welding 63 hours 1 --- 8 8
Erection of anchors 1 1 --- 1
Erection of drums and gears 1 2 --- 4
Erection of floating shaft / pulleys 1 1 --- 2
Erection of worm reducers / brake / motor 1 2 --- 4
Erection of other accessories / cabling 1 1 --- 2
Checking and trial running without ropes 1 1 --- 2
Rope fixing and checking 1 1 --- 2
Finishing / cleaning --- 1 --- 1
Trial running for lifting / lowering gate 1 1 --- 2
Total : 15 22 15 49
Note : It is assumed that all stitch welding will be done by fabricator. Hence, no separate provision is
considered for welder for stitch welding.
For surface cleaning by chemical cleaner
and wire brushing at 15 sqm / day : 3 helpers for 39 sqm
For painting 2 coats primer and 3 coats
finishing paint at 20 sqm / day : 10 painter Cl-ll & 2 helpers for 5 x 39 sqm
7. Excise duty on supply :
Excise duty is applicable on supply of fabricated parts. The cost of materials is inclusive of all
taxes/ duties. Therefore, for purpose of rate analysis 75 percent of total cost excluding the cost
of materials ( assuming 25 % erection cost ) is considered for assessing excise duty.
8. Use rate of materials :
Cost of welding set @ Rs: 3375.00 / Each Rs: 3375.00
Life of welding set : 1000 hours
Use rate of welding set per hour ( cost / life ) Rs: 3.38
Cost of gas cutting set @ Rs: 1125.00 / Each Rs: 1125
Life of gas cutting set : 600 hours
Use rate of gas cutting set per hr ( cost / life ) Rs: 1.88

RATE ANALYSIS UNIT : 3.002 tonne


A. MATERIALS: 10.00 t capacity
Sl No Perticulars Unit Quantity Rate Amount
in Rs. in Rs.
1 Structural steel
Angles / beams / channels / bars kg 1269.00 20.00 25380.00
Plates / flats kg 544.00 24.00 13056.00
Chequered plate kg 195.00 25.20 4914.00
2 Cast steel components :
Rope drums 2 Nos / Gears kg 384.00 95.00 36480.00
Pinions kg 14.00 105.00 1470.00
Pulleys 6 Nos kg 108.00 85.00 9180.00
Plummer blocks / Couplings kg 47.00 85.00 3995.00
3 Alloy steel components
Shafts kg 75.00 145.00 10875.00
Pins kg 24.00 175.00 4200.00

102
GATES AND HOISTS

4 Bronze alloy components :


Bronze bearings / bush kg 11.00 380.00 4180.00
5 Wire rope 12 mm dia 6/36 construction kg 42.00 75.00 3150.00
6 MS Bolt / Nut / Washer kg 68.00 45.00 3060.00
7 Worm reducers No. 1.00 39375.00 39375.00
8 Electric motor 2 hp No. 1.00 11250.00 11250.00
9 Manual operating system No. 1.00 8437.50 8437.50
10 Ele-magnetic brake No. 1.00 8437.50 8437.50
11 Wire rope sockets No 2.00 562.50 1125.00
12 Electric cable / switch / control panel etc LS 1.00 5625.00 5625.00
13 Oxygen gas cum 81.00 40.00 3240.00
14 Acetyline gas cum 27.00 185.00 4995.00
15 Welding electrodes Nos 79.00 4.00 316.00
16 Welding electrodes ( LH ) Nos 712.00 6.00 4272.00
17 Zinc chromate red oxide primer ltr 6.50 140.00 910.00
18 Synthetic enamel ( 1st quality ) paint ltr 10.00 140.00 1400.00
19 Rust cleaner / inhibitor ltr 5.00 175.00 875.00
20 Grease kg 10.00 90.00 900.00
21 Use rate welding holder set Hour 84.00 3.38 283.50
22 Use rate gas cutting torch set Hour 47.00 1.88 88.13
23 Wire brush Nos 1.00 25.00 25.00
24 Sundries LS 50.00 22.50 1125.00
TOTAL Rs: 212619.63
Add for small Tools and Plants @ 1% Rs: 2126.20
Add for Contractor' Profit @ 10% Rs: 21261.96
Add for Contrators' Overheads @ 5% Rs: 10630.98
Total cost of Materials Rs: 246638.77

B. MACHINERY:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Welding transformer Hour 84.00 9.00 756.00
Fuel / Energy charges Hour 53.00 49.00 2597.00
2 Pug cutting machine Hour 7.00 13.00 91.00
Fuel / Energy charges Hour 7.00 2.00 14.00
3 Mobile derric crane Hour 4.00 261.00 1044.00
Fuel / Energy charges Hour 4.00 117.00 468.00
4 Stationery derric crane Hour 8.00 50.00 400.00
Fuel / Energy charges Hour 8.00 5.00 40.00
5 Grinding machine Hour 8.00 15.00 120.00
Fuel / Energy charges Hour 8.00 20.00 160.00
6 Drilling machines Hour 16.00 15.00 240.00
Fuel / Energy charges Hour 16.00 20.00 320.00
7 Sundries LS 25.00 22.50 562.50
TOTAL Rs: 6812.50
Add for small Tools and Plants @ 1% Rs: 68.13
Add for Contractor' Profit on DPOL / Energy @ 10% Rs: 416.15
Add for Contrators' Overheads @ 5% Rs: 340.63
Total hire charges of Machinery Rs: 7637.40

C. LABOUR:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Crew for Mobile crane Hour 4.00 32.90 131.60
2 Crew for Drilling machine Hour 16.00 35.00 560.00

103
GATES AND HOISTS

3 Crew for Grinding machine Hour 8.00 35.00 280.00


4 Foreman Day 15.00 108.65 1629.75
5 Marker / Fabricator / Erector Day 22.00 93.70 2061.40
6 Gas cutter Day 7.00 93.70 655.90
7 Welder ( General ) Day 8.00 93.70 749.60
8 Helper fabrication / erection Day 49.00 81.60 3998.40
9 Helper for cleaning / painting Day 5.00 81.60 408.00
10 Painter Cl - II Day 10.00 81.60 816.00
11 Electrician Day 2.00 82.65 165.30
TOTAL Rs: 11455.95
Add for small Tools and Plants @ 1% Rs: 114.56
Add for Contractor' Profit @ 10% Rs: 1145.60
Add for hidden cost on Labour @ 15% Rs: 1718.39
Add for additional hidden cost on labour @ 10% Rs: 1145.60
Add for Contrators' Overheads @ 5% Rs: 572.80
Total cost of Labour Rs: 16152.89

ABSTRACT:
A. Cost of Materials Rs: 246638.77
B. Hire charges of Machinery Rs: 7637.40
C. Cost of Labour Rs: 16152.89
Total Rs: 270429.05
Add for excise duty on 75 percent cost
excluding cost of materials @ 18.00% Rs: 3211.69
Add for insurance charges @ 1.00% Rs: 2704.29
Add for designs and drawings @ 2.5% Rs: 6760.73
Add for zigs / supports / winches / chain-pulley @ 2.5% Rs: 6760.73
Add for power supply arrangements @ 2.5% Rs: 6760.73
Add for enabling works @ 2% Rs: 5408.58
Total Rs: 302035.79
Add for 2 rehandling leads for 1 km including loading and unloading :
Fabricated parts 2x3.002 tonnes @ Rs: 81.30 / tonne Rs: 488.13
Add for transportation upto work site @ 3% Rs: 9061.07
Total cost for 3.002 tonne Rs: 311584.99
10.000 t capacity
Rate per tonne Rs: 103790.00
Rate per tonne capacity of hoist Rs: 31160.00

SECTION: GATE / HOIST & ALLIED WORKS. YEAR: 2003-2004 ITEM No: 26

ITEM: Design, fabrication, supply, erection, testing and commissioning of adequate capacity
manually operated rope drum hoist consisting of hoist platform, rope drum, gear system,
brake system, wire rope, ladder etc., with all accessories for operating canal regulator
radial gate including cost of all materials, machinery, labour, cutting, aligning, anchoring,
welding, finishing, cleaning, applying two coats of zinc chromate red oxide primer and three
coats of approved synthetic enamel paint etc., complete with all leads and lifts.

DATA: Rope drum hoist for radial gate consists of embedded parts for anchorage, hoist supporting
structure, pulley supporting structures, pulleys, drive stool, rope drums, couplings, shafts,
gears and pinions, plummer blocks, worm reducer, floating shaft, hand operation assembly,
brake, wire rope, gate position indicator etc. with related accessories.
Consider rope drum hoist for radial gate for canal regulator opening of size 3 m x 3.7 m.
Details of material / Gas cutting / Welding considered for rate analysis are based on rope drum
hoist drawings for radial gate of UKP - ALBC Cross regulator without considering drive unit.

Generally the capacity of rope drum hoist for small radial gate will be about 2 times the weight

104
GATES AND HOISTS

of radial gate.
Weight of gate leaf in tonne for 3 m x 3.7 m spillway opening based on empirical formula :
Weight of gate in tonnes = 0.1685 x ( L^2 x H x h )^0.673
Where ( L ) is length and ( H ) is height and ( h ) is head of water in metres.
= 0.1685 x ( 3^2 x 3.9 x 3.7 )^0.673 : 4.456
Capacity of hoist required in tonnes with 25% reserve capacity : 2 x Wt of gate
( Capacity of hoist to be rounded off to next 5 tonne ) ( 2 x 4.456 ) : 8.912 tonnes
say : 10 tonnes
Weight of hoist with all accessories is assumed at 0.3 tonne per tonne capacity of hoist.
Weight of hoist with all accessories ( 0.3 x 10 ) : 3.000 tonnes
Less weight of drive unit ( electric motor / cover etc ) 0.200 tonne
Weight of manually operated hoist 2.800 tonnes
The actual weight of regulator radial gate rope drum hoist as per data sheet : 2.804 tonnes
Consider actual weight for data rate analysis.
1. Requirement of materials: as per fabrication drawings ( for details refer Item : 26 of Annexer )
a. Structural steel conforming to IS : 2062 :
Angles / Beams / Channels / Bars with 2.5 % wastage : 1229 kg
Plates / Flats with 2.5 % wastage : 453 kg
Chequered plate 195 kg
b. Cast steel components conforming to IS : 1030 :
Rope drums 2 Nos / Gears : 384 kg
Pinions : 14 kg
Pulleys 6 Nos : 108 kg
Plummer blocks / Hubs : 47 kg
c. Alloy steel components conforming to IS : 1570 :
Shafts : 75 kg
Pins 24 kg
d. Alluminium/ Bronze alloy components conforming to IS : 305 :
Bearings / Bush : 11 kg
e. Bolt / Nut / Washers conforming to IS : 1363 :
MS Bolts / Nuts / Washers with 2.5 % wastage : 64 kg
f. Steel wire rope conforming to IS : 2266 :
12 mm dia 6 / 36 construction 2 Nos 35 m each @ 0.6 kg / Rm : 42 kg
g. Other components :
Manual operating system : 1 No.
Worm reducers : 1 No.
Wire rope sockets : 2 Nos
MS pipe 32 mm dia : 10.5 Rm
h. Welding electrodes :
Welding electrodes for stitch welding at 10 % of total with 2.5 % wastage : 69 Nos
Welding electrodes ( LH ) for run welding at 90 % of total with 2.5 % wastage : 622 Nos
2. Cutting :
Length of cutting assuming cutting for 2 sides : 73 Rm
Add for variations ( cutting for more than 2 sides / odd shapes etc ) at 10 % : 7 Rm
Total : 80 Rm
For cutting structural steel sections to required sizes gas cutting is assumed.
Length of steel to be cut by using gas manually : 70 Rm
Length of steel to be cut by gas using pug cutting machine : 20 Rm
Time for gas cutting manually assuming average cutting progress of 2 m / hour : 35 hours
Time for gas cutting by pug cutting machine at ( av ) 3 m / hour : 7 hours
Acetelyne gas @ 0.6 cum / hour ( 42 x 0.60 ) : 25 cum
Oxygen gas @ 1.8 cum / hour ( 42 x 1.80 ) : 75 cum
Use of gas cutting torch with 50 min / hr working ( 35 x 60 / 50 ) : 42 hours

105
GATES AND HOISTS

Use of pug cutting machine with 50 min / hr working ( 7 x 60 / 50 ) : 8 hours


3. Welding :
Length of welding : 113 Rm
For stich welding @ 2 hrs usage / shift & @ 15 electrodes / hr
( 69 / 15 ) x 8 / 2 : 18 hours
For run welding @ 6 hrs usage / shift & @ 15 electrodes / hr
( 622 / 15 ) x 8 / 6 : 55 hours
Total : 73 hours
Deploy welding transformer for 73 hours.
Fuel / Energy charges @ 25 % hrs for stitch welding & @ 75 % hrs for run welding.
( 18 x 0.25 + 55 x 0.75 ) : 46 hours
4. Surface cleaning and painting :
Painting area at 20 sqm / t of str steel ( 1.82 x 20 ) : 36 sqm
2 coats of zinc chromate red oxide primer.
Quantity of primer paint for 36 sqm @ 12 sqm / ltr / coat : 6 ltr
3 coats of synthetic enamel paint.
Quantity of synthetic enamel paint for 36 sqm @ 12 sqm / ltr / coat : 9 ltr
As surface cleaning by sand blasting is hazardous, it is proposed to adopt chemical treatment
to remove grease, rust, scaling etc., and to form phasphate coating to prevent further rusting
before applying primer painting.
Quantity of rust cleaner / inhibitor at 8 sqm / ltr : 4.5 ltr
5. Requirement of other machinery :
For handling of parts during fabrication and erection use of mobile derric crane for 4 hours and
stationery derric crane for 8 hours considered.
For drilling holes for bolts 16 hours use of drilling machine considered.
For grinding and finishing weld joints 8 hours use of grinding machine considered
6. Requirement of work force :
Work component Foreman Marker / Gas cutter / Helper
Fabricator / Welder
Erector
Cutting sections 50 hours 3 6 6 12
Drilling holes for pins / bolts fixing 1 1 --- 1
Fabricating by stitch welding 18 hours 1 2 --- 4
Run welding 55 hours 1 --- 7 7
Erection of anchors 1 1 --- 1
Erection of drums and gears 1 2 --- 4
Erection of floating shaft / pulleys 1 1 --- 2
Erection of worm reducers / brake 1 2 --- 4
Erection of other accessories 1 1 --- 2
Checking and trial running without ropes 1 1 --- 2
Rope fixing and checking 1 1 --- 2
Finishing / cleaning --- 1 --- 1
Trial running for lifting / lowering gate 1 1 --- 2
Total : 14 20 13 44
Note : It is assumed that all stitch welding will be done by fabricator. Hence, no separate provision is
considered for welder for stitch welding.
For surface cleaning by chemical cleaner
and wire brushing at 15 sqm / day : 2 helpers for 36 sqm
For painting 2 coats primer and 3 coats
finishing paint at 20 sqm / day : 9 painter Cl-ll & 2 helpers for 5 x 36 sqm
7. Excise duty on supply :
Excise duty is applicable on supply of fabricated parts. The cost of materials is inclusive of all
taxes/ duties. Therefore, for purpose of rate analysis 75 percent of total cost excluding the cost
of materials ( assuming 25 % erection cost ) is considered for assessing excise duty.

106
GATES AND HOISTS

8. Use rate of materials :


Cost of welding set @ Rs: 3375.00 / Each Rs: 3375.00
Life of welding set : 1000 hours
Use rate of welding set per hour ( cost / life ) Rs: 3.38
Cost of gas cutting set @ Rs: 1125.00 / Each Rs: 1125
Life of gas cutting set : 600 hours
Use rate of gas cutting set per hr ( cost / life ) Rs: 1.88

RATE ANALYSIS UNIT : 2.804 tonne


A. MATERIALS: 10.00 t capacity
Sl No Perticulars Unit Quantity Rate Amount
in Rs. in Rs.
1 Structural steel
Angles / beams / channels / bars kg 1229.00 20.00 24580.00
Plates / flats kg 453.00 24.00 10872.00
Chequered plate kg 195.00 25.20 4914.00
2 Cast steel components :
Rope drums 2 Nos / Gears kg 384.00 95.00 36480.00
Pinions kg 14.00 105.00 1470.00
Pulleys 6 Nos kg 108.00 85.00 9180.00
Plummer blocks / Couplings kg 47.00 85.00 3995.00
3 Alloy steel components
Shafts kg 75.00 145.00 10875.00
Pins kg 24.00 175.00 4200.00
4 Bronze alloy components :
Bronze bearings / bush kg 11.00 380.00 4180.00
5 Wire rope 12 mm dia 6/36 construction kg 42.00 75.00 3150.00
6 MS Bolt / Nut / Washer kg 64.00 45.00 2880.00
7 Worm reducers No. 1.00 39375.00 39375.00
9 Manual operating system No. 1.00 8437.50 8437.50
10 Brake No. 1.00 2250.00 2250.00
11 Wire rope sockets No 2.00 562.50 1125.00
13 Oxygen gas cum 75.00 40.00 3000.00
14 Acetyline gas cum 25.00 185.00 4625.00
15 Welding electrodes Nos 69.00 4.00 276.00
16 Welding electrodes ( LH ) Nos 622.00 6.00 3732.00
17 Zinc chromate red oxide primer ltr 6.00 140.00 840.00
18 Synthetic enamel ( 1st quality ) paint ltr 9.00 140.00 1260.00
19 Rust cleaner / inhibitor ltr 4.50 175.00 787.50
20 Grease kg 10.00 90.00 900.00
21 Use rate welding holder set Hour 73.00 3.38 246.38
22 Use rate gas cutting torch set Hour 42.00 1.88 78.75
23 Wire brush Nos 1.00 25.00 25.00
24 Sundries LS 25.00 22.50 562.50
TOTAL Rs: 184296.63
Add for small Tools and Plants @ 1% Rs: 1842.97
Add for Contractor' Profit @ 10% Rs: 18429.66
Add for Contrators' Overheads @ 5% Rs: 9214.83
Total cost of Materials Rs: 213784.09

B. MACHINERY:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Welding transformer Hour 73.00 9.00 657.00
Fuel / Energy charges Hour 46.00 49.00 2254.00

107
GATES AND HOISTS

2 Pug cutting machine Hour 8.00 13.00 104.00


Fuel / Energy charges Hour 8.00 2.00 16.00
3 Mobile derric crane Hour 4.00 261.00 1044.00
Fuel / Energy charges Hour 4.00 117.00 468.00
4 Stationery derric crane Hour 8.00 50.00 400.00
Fuel / Energy charges Hour 8.00 5.00 40.00
5 Grinding machine Hour 8.00 15.00 120.00
Fuel / Energy charges Hour 8.00 20.00 160.00
6 Drilling machines Hour 16.00 15.00 240.00
Fuel / Energy charges Hour 16.00 20.00 320.00
7 Sundries LS 25.00 22.50 562.50
TOTAL Rs: 6385.50
Add for small Tools and Plants @ 1% Rs: 63.86
Add for Contractor' Profit on DPOL / Energy @ 10% Rs: 382.05
Add for Contrators' Overheads @ 5% Rs: 319.28
Total hire charges of Machinery Rs: 7150.68

C. LABOUR:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Crew for Mobile crane Hour 4.00 32.90 131.60
2 Crew for Drilling machine Hour 16.00 35.00 560.00
3 Crew for Grinding machine Hour 8.00 35.00 280.00
4 Foreman Day 14.00 108.65 1521.10
5 Marker / Fabricator / Erector Day 20.00 93.70 1874.00
6 Gas cutter Day 6.00 93.70 562.20
7 Welder ( General ) Day 7.00 93.70 655.90
8 Helper fabrication / erection Day 44.00 81.60 3590.40
9 Helper for cleaning / painting Day 4.00 81.60 326.40
10 Painter Cl - II Day 9.00 81.60 734.40
11 Electrician Day 2.00 82.65 165.30
TOTAL Rs: 10401.30
Add for small Tools and Plants @ 1% Rs: 104.01
Add for Contractor' Profit @ 10% Rs: 1040.13
Add for hidden cost on Labour @ 15% Rs: 1560.20
Add for additional hidden cost on labour @ 10% Rs: 1040.13
Add for Contrators' Overheads @ 5% Rs: 520.07
Total cost of Labour Rs: 14665.83

ABSTRACT:
A. Cost of Materials Rs: 213784.09
B. Hire charges of Machinery Rs: 7150.68
C. Cost of Labour Rs: 14665.83
Total Rs: 235600.60
Add for excise duty on 75 percent cost
excluding cost of materials @ 18.00% Rs: 2945.23
Add for insurance charges @ 1.00% Rs: 2356.01
Add for designs and drawings @ 2.5% Rs: 5890.01
Add for zigs / supports / winches / chain-pulley @ 2.5% Rs: 5890.01
Add for power supply arrangements @ 2.5% Rs: 5890.01
Add for enabling works @ 2% Rs: 4712.01
Total Rs: 263283.89
Add for 2 rehandling leads for 1 km including loading and unloading :
Fabricated parts 2x2.804 tonnes @ Rs: 81.30 / tonne Rs: 455.93

108
GATES AND HOISTS

Add for transportation upto work site @ 3% Rs: 7898.52


Total cost for 2.804 tonne Rs: 271638.34
10.000 t capacity
Rate per tonne Rs: 96880.00
Rate per tonne capacity of hoist Rs: 27160.00

SECTION: GATE / HOIST & ALLIED WORKS. YEAR: 2003-2004 ITEM No: 27

ITEM: Design, fabrication, supply, erection and commissioning of embedded parts ( with top seal
seat ) consisting of sill beam, wheel tracks, seal tracks, guide rails, groove lining upto top etc.,
with all accessories for vertical lift roller gate for canal escape / regulator including cost
of all materials, machinery, labour, cutting, aligning, anchoring, welding, finishing, cleaning,
applying one coat of zinc rich epoxy primer and four coats of cold applied coal tar epoxy paint
etc., complets as per specifications and approved drawings with all leads and lifts.

DATA: Embedded parts for canal escape / regulator gate consist of sill beam, wheel / seal tracks,
groove lining upto top, gate guide with all accessories such as first stage anchors.
Weight of embedded parts with groove lining for such small gates will be about 150 percent of
gate weight.
Consider embedded parts for canal escape / regulator gate for opening of size 2 m x 2 m.
Details of material / Gas cutting / Welding considered for rate analysis are based on embedded
parts drawings for vertical lift roller gate of UKP - ALBC Canal escape.
Weight of gate leaf in tonne for 2 m x 2 m opening based on empirical formula :
Size of gate : 2.5 m x 2.2 m Head of water above sill : 3.7 m
Weight of embedded parts in tonnes = 0.1332 x ( L^2 x H x h )^0.659
Where ( L ) is length and ( H ) is height and ( h ) is head of water in metres.
= 0.1332 x ( 2.5 x 2.5 x 2.2 x 3.7 ) ^ 0.659 : 1.775 tonnes
The actual weight of embedded parts as per data sheet : 1.784 tonnes
Consider actual weight for data rate analysis.
1. Requirement of materials: as per fabrication drawings ( for details refer Item : 27 of Annexer )
Structural steel conforming to IS : 2062 :
Structural steel angles / beams / channels / bars with 2.5 % wastage : 1219 kg
Structural steel plates / flats with 2.5 % wastage : 527 kg
Alloy steel components conforming to IS : 1570 :
Stainless steel plates / flats : 82.00 kg
Bolt / Nut / Washer conforming to IS : 1363 :
MS bolts and nuts with 2.5 % wastage : 1 kg
Welding electrodes :
Welding electrodes for stitch welding at 10 % of total with 2.5 % wastage : 121 Nos
Welding electrodes (SS) for stitch welding at 10 % of total with 2.5 % wastage : 23 Nos
Welding electrodes ( LH ) for run welding at 90 % of total with 2.5 % wastage : 1094 Nos
Welding electrodes ( SS ) for run welding at 90 % of total with 2.5 % wastage : 210 Nos
2. Cutting :
Total length of cutting assuming cutting for 2 sides : 40 Rm
Add for variations ( cutting for more than 2 sides / odd shapes etc ) at 10 % : 4 Rm
Total : 44 Rm
For cutting structural steel sections to required sizes gas cutting is assumed.
Length of steel to be cut by using gas manually : 24 m
Length of steel to be cut by gas using pug cutting machine : 20 m
Time for gas cutting manually assuming average cutting progress of 2 m / hour : 12 hours
Time for gas cutting by pug cutting machine at ( av ) 3 m / hour : 7 hours
Acetelyne gas @ 0.6 cum / hour ( 19 x 0.60 ) : 11 cum
Oxygen gas @ 1.8 cum / hour ( 19 x 1.80 ) : 33 cum
Use of gas cutting torch with 50 min / hr working ( 12 x 60 / 50 ) : 15 hours

109
GATES AND HOISTS

Use of pug cutting machine with 50 min / hr working ( 7 x 60 / 50 ) : 9 hours


3. Welding :
Length of welding : 207 m
For stich welding @ 2 hrs usage / shift & @ 15 electrodes / hr
( 121 + 23 ) x 8 / 15 / 2 : 38 hours
For run welding @ 6 hrs usage / shift & @ 15 electrodes / hr
( 1094 + 210 ) x 8 / 15 / 6 : 116 hours
Total : 154 hours
Deploy welding transformer for 154 hours.
Fuel / Energy charges @ 25 % hrs for stitch welding & @ 75 % hrs for run welding.
( 38 x 0.25 + 116 x 0.75 ) : 97 hours
4. Planing SS plates for seal seats :
For surface finishing of SS plates for wheel / seal tracks planing machine is considered.
Length of SS plate for surface finishing by planing machine : 18.3 Rm
Length of planing at a time for 4 m stroke planing machine : 3 Rm
Time for planing 3 m length section with 50 min / hour working : 8 hours
Time for planing 18.3 m SS plates ( 18.3 x 8 / 3 ) : 48 hours
5. Surface cleaning and painting :
Painting area for embedded parts at 5 sqm / tonne : 9 sqm
1 coats of zinc rich epoxy primer 40 micron dry film each coat.
Quantity of primer paint for 15 sqm @ 9 sqm / ltr / coat : 1 ltr
4 coats of coal tar epoxy paint 100 micron dry film each coat.
Quantity of coal tar epoxy paint for 15 sqm @ 6 sqm / ltr / coat : 6 ltr
As surface cleaning by sand blasting is hazardous, it is proposed to adopt chemical treatment
to remove grease, rust, scaling etc., and to form phasphate coating to prevent further rusting
before applying primer painting.
Quantity of rust cleaner / inhibitor at 8 sqm / ltr : 1 ltr
6. Requirement of other machinery :
For drilling holes for anchor bolts use of drilling machine for 1 hour considered.
For finishing weld joints / edges 2 hours use of grinding machine considered.
7. Requirement of work force :
Work component Foreman Marker / Gas cutter / Helper
Fabricator / Welder
Erector
Cutting sections / Drilling holes 25 hours 1.5 3 3 6
Fabricating by stitch welding 38 hours 2 5 --- 10
Run welding 116 hours 1.5 --- 15 15
Erection of first stage anchors --- 1 --- 2
Erection of Sill beam / Tracks / Guide 1 2 --- 4
Finishing / cleaning --- 1 --- 1
Total : 6 12 18 38
Note : It is assumed that all stitch welding will be done by fabricator. Hence, no separate provision is
considered for welder for stitch welding.
For surface cleaning by chemical cleaner
and wire brushing at 15 sqm / day : 1 helper for 9 sqm
For painting 1 coat primer and 4 coats
finishing paint at 15 sqm / day : 3 painter Cl-ll & 1 helper for 5 x 9 sqm
8. Excise duty on supply :
Excise duty is applicable on supply of fabricated parts. The cost of materials is inclusive of all
taxes/ duties. Therefore, for purpose of rate analysis 75 percent of total cost excluding the cost
of materials ( assuming 25 % erection cost ) is considered for assessing excise duty.
9. Use rate of materials :
Cost of welding set @ Rs: 3375.00 / Each Rs: 3375.00
Life of welding set : 1000 hours
Use rate of welding set per hour ( cost / life ) Rs: 3.38

110
GATES AND HOISTS

Cost of gas cutting set @ Rs: 1125.00 / Each Rs: 1125


Life of gas cutting set : 600 hours
Use rate of gas cutting set per hr ( cost / life ) Rs: 1.88

RATE ANALYSIS UNIT : 1.784 tonne


A. MATERIALS:
Sl No Perticulars Unit Quantity Rate Amount
in Rs. in Rs.
1 Str steel angle / beam / channel / bars kg 1219.00 20.00 24380.00
2 Structural steel plate / flats kg 527.00 24.00 12648.00
3 Stainless steel plate / flats kg 82.00 90.00 7380.00
4 MS bolts and nuts kg 1.00 45.00 45.00
5 Oxygen gas cum 33.00 40.00 1320.00
6 Acetyline gas cum 11.00 185.00 2035.00
7 Welding electrodes Nos 121.00 4.00 484.00
8 Welding electrodes ( LH ) Nos 1094.00 6.00 6564.00
9 Welding electrodes ( stainless steel ) Nos 233.00 35.00 8155.00
10 Zinc rich epoxy primer ltr 1.00 525.00 525.00
11 Coal tar epoxy paint ltr 6.00 131.00 786.00
12 Rust cleaner / inhibitor ltr 1.00 175.00 175.00
13 Use rate welding holder set Hour 154.00 3.38 519.75
14 Use rate gas cutting torch set Hour 15.00 1.88 28.13
15 Wire brush Nos 0.50 25.00 12.50
16 Sundries LS 5.00 22.50 112.50
TOTAL Rs: 65169.88
Add for small Tools and Plants @ 1% Rs: 651.70
Add for Contractor' Profit @ 10% Rs: 6516.99
Add for Contrators' Overheads @ 5% Rs: 3258.49
Total cost of Materials Rs: 75597.06

B. MACHINERY:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Welding transformer Hour 154.00 9.00 1386.00
Fuel / Energy charges Hour 97.00 49.00 4753.00
2 Pug cutting machine Hour 9.00 13.00 117.00
Fuel / Energy charges Hour 9.00 2.00 18.00
3 Planing machine Hour 48.00 66.00 3168.00
Fuel / Energy charges Hour 48.00 61.00 2928.00
4 Grinding machine Hour 2.00 15.00 30.00
Fuel / Energy charges Hour 2.00 20.00 40.00
5 Drilling machines Hour 1.00 15.00 15.00
Fuel / Energy charges Hour 1.00 20.00 20.00
6 Sundries LS 2.00 22.50 45.00
TOTAL Rs: 12520.00
Add for small Tools and Plants @ 1% Rs: 125.20
Add for Contractor' Profit on DPOL / Energy @ 10% Rs: 780.40
Add for Contrators' Overheads @ 5% Rs: 626.00
Total hire charges of Machinery Rs: 14051.60

C. LABOUR:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Crew for Planing machine Hour 48.00 42.75 2052.00
2 Crew for Drilling machine Hour 1.00 35.00 35.00

111
GATES AND HOISTS

3 Crew for Grinding machine Hour 2.00 35.00 70.00


4 Foreman Day 6.00 108.65 651.90
5 Marker / Fabricator / Erector Day 12.00 93.70 1124.40
6 Gas cutter Day 3.00 93.70 281.10
7 Welder ( General ) Day 13.00 93.70 1218.10
8 Welder ( X - ray ) Day 2.00 103.07 206.14
9 Helper fabrication / erection Day 38.00 81.60 3100.80
10 Helper for cleaning / painting Day 2.00 81.60 163.20
11 Painter Cl - II Day 3.00 81.60 244.80
12 Electrician Day 1.00 82.65 82.65
TOTAL Rs: 9230.09
Add for small Tools and Plants @ 1% Rs: 92.30
Add for Contractor' Profit @ 10% Rs: 923.01
Add for hidden cost on Labour @ 15% Rs: 1384.51
Add for additional hidden cost on labour @ 10% Rs: 923.01
Add for Contrators' Overheads @ 5% Rs: 461.50
Total cost of Labour Rs: 13014.43

ABSTRACT:
A. Cost of Materials Rs: 75597.06
B. Hire charges of Machinery Rs: 14051.60
C. Cost of Labour Rs: 13014.43
Total Rs: 102663.08
Add for excise duty on 75 percent cost
excluding cost of materials @ 18.00% Rs: 3653.91
Add for insurance charges @ 1.00% Rs: 1026.63
Add for designs and drawings @ 2.5% Rs: 2566.58
Add for zigs / supports / winches / chain-pulley @ 2.5% Rs: 2566.58
Add for power supply arrangements @ 2.5% Rs: 2566.58
Add for enabling works @ 2% Rs: 2053.26
Total Rs: 117096.62
Add for 2 rehandling leads for 1 km including loading and unloading :
Fabricated parts 2x1.784 tonnes @ Rs: 81.30 / tonne Rs: 290.08
Add for transportation upto work site @ 3% Rs: 3512.90
Total cost for 1.784 tonne Rs: 120899.60
Rate per tonne Rs: 67770.00

SECTION: GATE / HOIST & ALLIED WORKS. YEAR: 2003-2004 ITEM No: 28

ITEM: Design, fabrication, supply, erection, testing and commissioning of fixed wheel type vertical
lift gate ( with top seal ) consisting of skin plate, horizontal and vertical girders, wheels,
guide rollers, rubber seals etc., with all accessories for canal escape / regulator vent
including cost of all materials, machinery, labour, cutting, aligning, welding, finishing, cleaning,
applying one coat of zinc rich epoxy primer and three coats of cold applied coal tar epoxy paint,
seal fixing etc., complete as per specifications and approved drawings with all leads and lifts.

DATA: Consider down stream sealing vertical lift roller gate. The gate leaf consists of skin plate,
horizontal girders, vertical end girders, stiffeners, wheels, gate guide rollers, brackets, pins,
seals etc., with all accessories.
Consider canal escape / regulator gate for 2 m x 2 m vent opening for analysis.
Details of material / Gas cutting / Welding considered for rate analysis are based on vertical lift
roller gate drawings for UKP - ALBC escape.
Weight of gate leaf in tonne for vertical lift gate based on empirical formula :
Weight in tonnes = 0.0888 ( L^2 x H x h )^0.659
Where ( L ) is length and ( H ) is height of gate and ( h ) is head of water in metre.

112
GATES AND HOISTS

For vent opening of 2 x 2 m the approximate size of gate leaf will be 2.5 x 2.2 m.
Head of water above sill level : 3.7 m
Weight in tonnes = 0.0888 ( 2.5 x 2.5 x 2.2 x 3.7 ) ^ 0.659 : 1.183
The actual weight of canal escape gate as per data sheet : 1.217 tonnes
Consider actual weight for data rate analysis.
1. Requirement of materials: as per fabrication drawings ( for details refer Item : 28 of Annexer )
a. Structural steel conforming to IS : 2062 :
Angles / Channels / Beams / Bars with 2.5 % wastage : 250 kg
Plates / flats with 2.5 % wastage : 899 kg
b. Alloy steel components conforming to IS : 1570 :
Wheel axles / Pins : 30 kg
c. Cast steel components conforming to IS : 1030 :
Wheels / guide rollers : 50 kg
d. Alluminium / Bronze alloy components conforming to IS : 305 :
Bearings / Bushes : 5 kg
e. Bolts / Nuts / Washers conforming to IS : 1363 :
GI bolts / nuts / washers with 2.5 % wastage : 8 kg
MS bolts / nuts / washers with 2.5 % wastage : 4 kg
f. Rubber seal conforming to IS : 11855 :
Bottom seal ( uncladed ) : 2.3 Rm
Side seals ( uncladed ) : 4.0 Rm
Top seal ( uncladed ) : 1.9 Rm
g. Welding electrodes :
Welding electrodes for stitch welding at 10 % of total with 2.5 % wastage : 67 Nos
Welding electrodes ( LH ) for run welding at 90 % of total with 2.5 % wastage : 605 Nos
2. Cutting :
Total length of cutting assuming cutting for 2 sides : 45 Rm
Add for variations ( cutting for more than 2 sides / odd shapes etc ) at 10 % : 5 Rm
Total : 50 Rm
For cutting structural steel sections to required sizes gas cutting is assumed.
Length of steel to be cut by using gas manually : 20 m
Length of steel to be cut by gas using pug cutting machine : 30 m
Time for gas cutting manually assuming average cutting progress of 2 m / hour 10 hours
Time for gas cutting by pug cutting machine at ( av ) 3 m / hour : 10 hours
Acetelyne gas @ 0.6 cum / hour ( 20 x 0.60 ) : 12 cum
Oxygen gas @ 1.8 cum / hour ( 20 x 1.80 ) : 36 cum
Use of gas cutting torch with 50 min / hr working ( 10 x 60 / 50 ) : 12 hours
Use of pug cutting machine with 50 min / hr working ( 10 x 60 / 50 ) : 12 hours
3. Welding :
Length of welding : 94 Rm
For stich welding @ 2 hrs usage / shift & @ 15 electrodes / hr
( 67 / 15 ) x 8 / 2 : 18 hours
For run welding @ 6 hrs usage / shift & @ 15 electrodes / hr
( 605 / 15 ) x 8 / 6 : 54 hours
Total : 72 hours
Deploy welding transformer for 72 hours.
Fuel / Energy charges @ 25 % hrs for stitch welding & @ 75 % hrs for run welding.
( 18 x 0.25 + 54 x 0.75 ) : : 45 hours
4. Surface cleaning and painting :
Painting area for canal escape gate at 18 sqm / tonne : 22 sqm
1 coat of zinc rich epoxy primer 40 micron dry film each coat.
Quantity of primer paint for 22 sqm @ 9 sqm / ltr / coat : 2.5 ltr
3 coats of coal tar epoxy paint 100 micron dry film each coat.
Quantity of coal tar epoxy paint for 22 sqm @ 6 sqm / ltr / coat : 11 ltr
As surface cleaning by sand blasting is hazardous, it is proposed to adopt chemical treatment

113
GATES AND HOISTS

to remove grease, rust, scaling etc., and to form phasphate coating to prevent further rusting
before applying primer painting.
Quantity of rust cleaner / inhibitor at 8 sqm / ltr : 3 ltr
5. Requirement of other machinery :
For handling of parts during fabrication and erection use of mobile derric crane for 2 hours and
stationery derric crane for 4 hours considered.
For drilling holes in skin plate, end girders and seal clamps use of drilling machine for 2 hours
considered.
For grinding and finishing weld joints in skin plate and other locations 2 hours use of grinding
machine considered.
6. Requirement of work force :
Work component Foreman Marker / Gas cutter / Helper
Fabricator / Welder
Erector
Cutting sections / Drilling holes 26 hours 1 3 3 6
Fabricating by stitch welding 18 hours 1 2 --- 4
Run welding 54 hours 1 --- 7 7
Wheel fixing / Seal fixing 1 1 --- 2
Guide roller fixing / Finishing / Erecting 1 1 --- 2
Total : 5 7 10 21
Note : It is assumed that all stitch welding will be done by fabricator. Hence, no separate provision is
considered for welder for stitch welding.
For surface cleaning by chemical cleaner
and wire brushing at 15 sqm / day : 1.5 helper for 22 sqm
For painting 1 coat primer and 3 coats
finishing paint at 15 sqm / day : 6 painter Cl-ll & 1.5 helper for 4 x 22 sqm
7. Excise duty on supply :
Excise duty is applicable on supply of fabricated parts. The cost of materials is inclusive of all
taxes/ duties. Therefore, for purpose of rate analysis 75 percent of total cost excluding the cost
of materials ( assuming 25 % erection cost ) is considered for assessing excise duty.
8. Use rate of materials :
Cost of welding set @ Rs: 3375.00 / Each Rs: 3375.00
Life of welding set : 1000 hours
Use rate of welding set per hour ( cost / life ) Rs: 3.38
Cost of gas cutting set @ Rs: 1125.00 / Each Rs: 1125
Life of gas cutting set : 600 hours
Use rate of gas cutting set per hr ( cost / life ) Rs: 1.88

RATE ANALYSIS UNIT : 1.217 tonne


A. MATERIALS:
Sl No Perticulars Unit Quantity Rate Amount
in Rs. in Rs.
1 Structural steel
Angles / Channels / Beams / Bars kg 250.00 20.00 5000.00
Plates / flats kg 899.00 24.00 21576.00
2 Alloy steel components
Wheel axles / Pins kg 30.00 175.00 5250.00
3 Cast steel components
Wheels / Guide rollers kg 50.00 85.00 4250.00
4 Alluminium / Bronze alloy components
Bearings / Bushes kg 5.00 380.00 1900.00
5 Bolt / Nut / Washer
GI bolts / nuts / washers kg 8.00 60.00 480.00
MS bolts / nuts / washers kg 4.00 45.00 180.00

114
GATES AND HOISTS

6 Rubber seals
Bottom seal ( uncladed ) Rm 2.30 120.00 276.00
Side seals ( uncladed ) Rm 3.60 190.00 684.00
Top seal ( uncladed ) Rm 1.50 190.00 285.00
Corner seal ( uncladed ) Nos 2.00 240.00 480.00
7 Oxygen gas cum 36.00 40.00 1440.00
8 Acetyline gas cum 12.00 185.00 2220.00
9 Welding electrodes Nos 67.00 4.00 268.00
10 Welding electrodes ( LH ) Nos 605.00 6.00 3630.00
11 Zinc rich epoxy primer ltr 2.50 525.00 1312.50
12 Coal tar epoxy paint ltr 11.00 131.00 1441.00
13 Rust cleaner / inhibitor ltr 3.00 175.00 525.00
14 Use rate welding holder set Hour 72.00 3.38 243.00
15 Use rate gas cutting torch set Hour 12.00 1.88 22.50
16 Wire brush Nos 0.50 25.00 12.50
17 Sundries LS 10.00 22.50 225.00
TOTAL Rs: 51700.50
Add for small Tools and Plants @ 1% Rs: 517.01
Add for Contractor' Profit @ 10% Rs: 5170.05
Add for Contrators' Overheads @ 5% Rs: 2585.03
Total cost of Materials Rs: 59972.58

B. MACHINERY:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Welding transformer Hour 72.00 9.00 648.00
Fuel / Energy charges Hour 45.00 49.00 2205.00
2 Pug cutting machine Hour 12.00 13.00 156.00
Fuel / Energy charges Hour 12.00 2.00 24.00
3 Mobile derric crane Hour 2.00 261.00 522.00
Fuel / Energy charges Hour 2.00 117.00 234.00
4 Stationery derric crane Hour 4.00 50.00 200.00
Fuel / Energy charges Hour 4.00 5.00 20.00
5 Grinding machine Hour 2.00 15.00 30.00
Fuel / Energy charges Hour 2.00 20.00 40.00
6 Drilling machines Hour 2.00 15.00 30.00
Fuel / Energy charges Hour 2.00 20.00 40.00
7 Sundries LS 5.00 22.50 112.50
TOTAL Rs: 4261.50
Add for small Tools and Plants @ 1% Rs: 42.62
Add for Contractor' Profit on DPOL / Energy @ 10% Rs: 267.55
Add for Contrators' Overheads @ 5% Rs: 213.08
Total hire charges of Machinery Rs: 4784.74

C. LABOUR:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Crew for Mobile crane Hour 2.00 32.90 65.80
2 Crew for Drilling machine Hour 2.00 35.00 70.00
3 Crew for Grinding machine Hour 2.00 35.00 70.00
4 Foreman Day 5.00 108.65 543.25
5 Marker / Fabricator / Erector Day 7.00 93.70 655.90
6 Gas cutter Day 3.00 93.70 281.10
7 Welder ( General ) Day 6.00 93.70 562.20
8 Welder ( X - ray grade ) Day 1.00 103.07 103.07

115
GATES AND HOISTS

9 Helper fabrication / erection Day 21.00 81.60 1713.60


10 Helper for cleaning / painting Day 3.00 81.60 244.80
11 Painter Cl - II Day 6.00 81.60 489.60
12 Electrician Day 1.00 82.65 82.65
TOTAL Rs: 4881.97
Add for small Tools and Plants @ 1% Rs: 48.82
Add for Contractor' Profit @ 10% Rs: 488.20
Add for hidden cost on Labour @ 15% Rs: 732.30
Add for additional hidden cost on labour @ 10% Rs: 488.20
Add for Contrators' Overheads @ 5% Rs: 244.10
Total cost of Labour Rs: 6883.58

ABSTRACT:
A. Cost of Materials Rs: 59972.58
B. Hire charges of Machinery Rs: 4784.74
C. Cost of Labour Rs: 6883.58
Total Rs: 71640.90
Add for excise duty on 75 percent cost
excluding cost of materials @ 18.00% Rs: 1575.22
Add for insurance charges @ 1.00% Rs: 716.41
Add for designs and drawings @ 2.5% Rs: 1791.02
Add for zigs / supports / winches / chain-pulley @ 2.5% Rs: 1791.02
Add for power supply arrangements @ 2.5% Rs: 1791.02
Add for enabling works @ 2% Rs: 1432.82
Total Rs: 80738.41
Add for 2 rehandling leads for 1 km including loading and unloading :
Fabricated parts 2x1.217 tonnes @ Rs: 81.30 / tonne Rs: 197.88
Add for transportation upto work site @ 3% Rs: 2422.15
Total cost for 1.217 tonne Rs: 83358.45
Rate per tonne Rs: 68500.00

SECTION: GATE / HOIST & ALLIED WORKS. YEAR: 2003-2004 ITEM No: 29

ITEM: Design, fabrication, supply, erection, testing and commissioning of adequate capacity screw
type hoist consisting of supporting structure, platform, ladder etc., with all accessories for
operating canal escape / regulator gate including cost of all materials, machinery, labour,
cutting, aligning, anchoring, welding, finishing, cleaning, applying two coats of zinc chromate
red oxide primer and three coats of approved synthetic enamel paint etc., complete with all
leads and lifts.

DATA: Screw type hoist for operating gate consists of supporting structure, hoist body, hoist stem,
thrust bearings, operating wheel / handle with related accessories.
The capacity of screw hoist for canal gate may be considered at 2.5 times the weight of gate.
Consider screw type hoist for canal escape / regulator gate for vent opening of size 2 m x 2 m.
Details of material / Gas cutting / Welding considered for rate analysis are based on screw type
hoist drawings for UKP - ALBC escape.
Weight of gate leaf in tonne for 2 m x 2 m vent opening based on empirical formula :
Size of gate : 2.5 m x 2.2 m Head of water above sill : 3.7 m.
Weight of gate in tonnes = 0.0888 x ( L^2 x H x h )^0.659
Where ( L ) is length and ( H ) is height and ( h ) is head of water in metres.
= 0.0888 x ( 2.5^2 x 2.2 x 3.7 )^0.659 : 1.183
Capacity of hoist with 25 % reserve capacity : 2.5 x Weight of gate
( Capacity of hoist to be rounded off to next 1 tonne ) : 2.5 x 1.183
: 2.957 tonnes

116
GATES AND HOISTS

say : 3.00 tonnes


Actual capacity of hoist as per data : 3.00 tonnes
Weight of hoist with all accessories is assumed at 0.3 tonne per tonne capacity of hoist.
Weight of hoist with all accessories ( 0.3 x 3 ) : 0.900 tonne
The actual weight of screw hoist as per data sheet : 0.871 tonne
Consider actual weight for data rate analysis.
1. Requirement of materials: as per fabrication drawings ( for details refer Item : 29 of Annexer )
a. Structural steel conforming to IS : 2062 :
Angles / Beams / Channels / Bars with 2.5 % wastage : 402.00 kg
Plates / Flats with 2.5 % wastage : 145.00 kg
Chequered plates with 2.5 % wastage : 176.00 kg
b. Cast iron components conforming to IS : 210 :
Hoist body / Lock nut / Main nut : 55.00 kg
c. Alloy steel components conforming to IS : 1570 :
Hoist stem : 75.00 kg
d. Alluminium/ Bronze alloy components conforming to IS : 305 :
Bearings / Bush : 4.00 kg
e. Bolt / Nut / Washers conforming to IS : 1363 :
MS Bolts / Nuts / Washers with 2.5 % wastage : 8.00 kg
MS pipe 32 mm dia : 8.8 Rm
f. Welding electrodes :
Welding electrodes for stitch welding at 10 % of total with 2.5 % wastage : 7 Nos
Welding electrodes for run welding at 90 % of total with 2.5 % wastage : 66 Nos
2. Cutting :
Total length of cutting assuming cutting for 2 sides : 18 Rm
Add for variations ( cutting for more than 2 sides / odd shapes etc ) at 10 % : 2 Rm
Total : 20 Rm
For cutting structural steel sections to required sizes gas cutting is assumed.
Time for gas cutting manually assuming average cutting progress of 2 m / hour : 10 hours
Acetelyne gas @ 0.6 cum / hour ( 10 x 0.60 ) : 6 cum
Oxygen gas @ 1.8 cum / hour ( 10 x 1.80 ) : 18 cum
Use of gas cutting torch with 50 min / hr working ( 10 x 60 / 50 ) : 12 hours
3. Welding :
Length of welding : 10 Rm
For stich welding @ 2 hrs usage / shift & @ 15 electrodes / hr
( 7 / 15 ) x 8 / 2 : 2 hours
For run welding @ 6 hrs usage / shift & @ 15 electrodes / hr
( 66 / 15 ) x 8 / 6 : 6 hours
Total : 8 hours
Deploy welding transformer for 8 hours.
Fuel / Energy charges @ 25 % hrs for stitch welding & @ 75 % hrs for run welding.
( 2 x 0.25 + 6 x 0.75 ) : 5 hours
4. Surface cleaning and painting :
Painting area for screw hoist at 20 sqm / tonne of str steel : 18 sqm
2 coats of zinc chromate red oxide primer.
Quantity of primer paint for 18 sqm @ 12 sqm / ltr / coat : 3 ltr
3 coats of synthetic enamel paint.
Quantity of coal tar epoxy paint for 18 sqm @ 12 sqm / ltr / coat : 4.5 ltr
As surface cleaning by sand blasting is hazardous, it is proposed to adopt chemical treatment
to remove grease, rust, scaling etc., and to form phasphate coating to prevent further rusting
before applying primer painting.
Quantity of rust cleaner / inhibitor at 8 sqm / ltr : 2 ltr
5. Requirement of other machinery :
For drilling holes for bolts 2 hours use of drilling machine considered.
For grinding and finishing weld joints 2 hours use of grinding machine considered

117
GATES AND HOISTS

6. Requirement of work force :


Work component Foreman Marker / Gas cutter / Helper
Fabricator / Welder
Erector
Cutting sections / Drilling holes 14 hours 1 2 2 4
Fabricating / welding 8 hours 1 1 1 2
Erection of hoist frame / body 1 1 --- 2
Trial operation and final adjustments 1 1 --- 1
Total : 4 5 3 9
Note : It is assumed that all stitch welding will be done by fabricator. Hence, no separate provision is
considered for welder for stitch welding.
For surface cleaning by chemical cleaner
and wire brushing at 15 sqm / day : 1 helpers for 18 sqm
For painting 2 coats primer and 3 coats
finishing paint at 20 sqm / day : 4 painter Cl-ll & 1 helpers for 5 x 18 sqm
7. Excise duty on supply :
Excise duty is applicable on supply of fabricated parts. The cost of materials is inclusive of all
taxes/ duties. Therefore, for purpose of rate analysis 75 percent of total cost excluding the cost
of materials ( assuming 25 % erection cost ) is considered for assessing excise duty.
8. Use rate of materials :
Cost of welding set @ Rs: 3375.00 / Each Rs: 3375.00
Life of welding set : 1000 hours
Use rate of welding set per hour ( cost / life ) Rs: 3.38
Cost of gas cutting set @ Rs: 1125.00 / Each Rs: 1125
Life of gas cutting set : 600 hours
Use rate of gas cutting set per hr ( cost / life ) Rs: 1.88

RATE ANALYSIS UNIT : 0.871 tonne


A. MATERIALS: 3.000 t capacity
Sl No Perticulars Unit Quantity Rate Amount
in Rs. in Rs.
1 Structural steel
Angles / beams / channels / bars kg 402.00 20.00 8040.00
Plates / flats kg 145.00 24.00 3480.00
Chequered plate kg 176.00 25.20 4435.20
2 Cast iron components :
Hoist body / Lock nut / Main nut kg 55.00 95.00 5225.00
3 Alloy steel components
Hoist stem kg 75.00 145.00 10875.00
4 Bronze alloy components :
Thrust bearings kg 4.00 380.00 1520.00
5 MS Bolt / Nut / Washer kg 8.00 45.00 360.00
6 Oxygen gas cum 18.00 40.00 720.00
7 Acetyline gas cum 6.00 185.00 1110.00
8 Welding electrodes Nos 7.00 4.00 28.00
9 Welding electrodes ( LH ) Nos 66.00 6.00 396.00
10 Zinc chromate red oxide primer ltr 3.00 140.00 420.00
11 Synthetic enamel ( 1st quality ) paint ltr 4.50 140.00 630.00
12 Rust cleaner / inhibitor ltr 2.00 175.00 350.00
13 Grease kg 2.00 90.00 180.00
14 Use rate welding holder set Hour 8.00 3.38 27.00
15 Use rate gas cutting torch set Hour 11.00 1.88 20.63
16 Wire brush Nos 0.50 25.00 12.50
17 Sundries LS 2.00 22.50 45.00
TOTAL Rs: 37874.33

118
GATES AND HOISTS

Add for small Tools and Plants @ 1% Rs: 378.74


Add for Contractor' Profit @ 10% Rs: 3787.43
Add for Contrators' Overheads @ 5% Rs: 1893.72
Total cost of Materials Rs: 43934.22

B. MACHINERY:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Welding transformer Hour 8.00 9.00 72.00
Fuel / Energy charges Hour 5.00 49.00 245.00
2 Grinding machine Hour 2.00 15.00 30.00
Fuel / Energy charges Hour 2.00 20.00 40.00
3 Drilling machines Hour 2.00 15.00 30.00
Fuel / Energy charges Hour 2.00 20.00 40.00
4 Sundries LS 2.00 22.50 45.00
TOTAL Rs: 502.00
Add for small Tools and Plants @ 1% Rs: 5.02
Add for Contractor' Profit on DPOL / Energy @ 10% Rs: 37.00
Add for Contrators' Overheads @ 5% Rs: 25.10
Total hire charges of Machinery Rs: 569.12

C. LABOUR:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Crew for Drilling machine Hour 2.00 35.00 70.00
2 Crew for Grinding machine Hour 2.00 35.00 70.00
3 Foreman Day 4.00 108.65 434.60
4 Marker / Fabricator / Erector Day 5.00 93.70 468.50
5 Gas cutter Day 2.00 93.70 187.40
6 Welder ( General ) Day 1.00 93.70 93.70
7 Helper fabrication / erection Day 9.00 81.60 734.40
8 Helper for cleaning / painting Day 2.00 81.60 163.20
9 Painter Cl - II Day 4.00 81.60 326.40
10 Electrician Day 0.50 82.65 41.33
TOTAL Rs: 2589.53
Add for small Tools and Plants @ 1% Rs: 25.90
Add for Contractor' Profit @ 10% Rs: 258.95
Add for hidden cost on Labour @ 15% Rs: 388.43
Add for additional hidden cost on labour @ 10% Rs: 258.95
Add for Contrators' Overheads @ 5% Rs: 129.48
Total cost of Labour Rs: 3651.23

ABSTRACT:
A. Cost of Materials Rs: 43934.22
B. Hire charges of Machinery Rs: 569.12
C. Cost of Labour Rs: 3651.23
Total Rs: 48154.57
Add for excise duty on 75 percent cost
excluding cost of materials @ 18.00% Rs: 569.75
Add for insurance charges @ 1.00% Rs: 481.55
Add for designs and drawings @ 2.5% Rs: 1203.86
Add for zigs / supports / winches / chain-pulley @ 2.5% Rs: 1203.86
Add for power supply arrangements @ 2.5% Rs: 1203.86
Add for enabling works @ 2% Rs: 963.09
Total Rs: 53780.54

119
GATES AND HOISTS

Add for 2 rehandling leads for 1 km including loading and unloading :


Fabricated parts 2x0.871 tonnes @ Rs: 81.30 / tonne Rs: 141.62
Add for transportation upto work site @ 3% Rs: 1613.42
Total cost for 0.871 tonne Rs: 55535.59
3.000 t capacity
Rate per tonne Rs: 63760.00
Rate per tonne capacity Rs: 18510.00

SECTION: GATE / HOIST & ALLIED WORKS. YEAR: 2003-2004 ITEM No: 30

ITEM: Design, fabrication, supply, erection and commissioning of embedded parts consisting of sill
beam, wheel tracks, seal tracks, guide rails, gate groove liners etc., with all accessories for
canal escape / regulator stoplog gate including cost of all materials, machinery, labour,
aligning, anchoring, welding, finishing, cleaning, applying one coat of zinc rich epoxy primer
and four coats of cold applied coal tar epoxy paint etc., complete as per specifications and
approved drawings with all leads and lifts.

DATA: Embedded parts for canal escape / regulator stop log gate consist of sill beam, wheel / seal
tracks, groove lining upto top, gate guide with all accessories such as first stage anchors.
Weight of embedded parts for such small gates will be in the range of 65 to 70 % of gate weight.
Consider embedded parts for canal escape / regulator stoplog gate for 2 m x 2 m vent opening.
Details of material / Gas cutting / Welding considered for rate analysis are based on embedded
parts drawings for stop log gate of UKP - ALBC escape.
Weight of embedded parts in tonne for 2 m wide opening based on empirical formula :
Length of gate element : 2.50 m Total height of elements : 4.00 m
Head of water above sill level : 3.70 m
Weight of embedded parts in tonnes = 0.0665 x ( L^2 x H x h )^0.716
Where ( L ) is length and ( H ) is total height and ( h ) is head of water in metres.
= 0.0665 x ( 2.5 x 2.5 x 4 x 3.7 ) ^ 0.716 : 1.701
The actual weight of embedded parts as per data sheet : 1.685 tonnes
Consider actual weight for data rate analysis.
1. Requirement of materials: as per fabrication drawings ( for details refer Item : 30 of Annexer )
Structural steel conforming to IS : 2062 :
Structural steel angles / beams / channels / bars with 2.5 % wastage : 1134 kg
Structural steel plates / flats with 2.5 % wastage : 523 kg
Alloy steel components conforming to IS : 1570 :
Stainless steel plates / flats : 68.00 kg
Bolt / Nut / Washer conforming to IS : 1363 :
MS bolts and nuts with 2.5 % wastage : 1 kg
Welding electrodes :
Welding electrodes for stitch welding at 10 % of total with 2.5 % wastage : 116 Nos
Welding electrodes (SS) for stitch welding at 10 % of total with 2.5 % wastage : 21 Nos
Welding electrodes ( LH ) for run welding at 90 % of total with 2.5 % wastage : 1042 Nos
Welding electrodes ( SS ) for run welding at 90 % of total with 2.5 % wastage : 190 Nos
2. Cutting :
Total length of cutting assuming cutting for 2 sides : 37 Rm
Add for variations ( cutting for more than 2 sides / odd shapes etc ) at 10 % : 4 Rm
Total : 41 Rm
For cutting structural steel sections to required sizes gas cutting is assumed.
Length of steel to be cut by using gas manually : 20 m
Length of steel to be cut by gas using pug cutting machine : 21 m
Time for gas cutting manually assuming average cutting progress of 2 m / hour : 10 hours
Time for gas cutting by pug cutting machine at ( av ) 3 m / hour : 7 hours

120
GATES AND HOISTS

Acetelyne gas @ 0.6 cum / hour ( 17 x 0.60 ) : 10 cum


Oxygen gas @ 1.8 cum / hour ( 17 x 1.80 ) : 30 cum
Use of gas cutting torch with 50 min / hr working ( 10 x 60 / 50 ) : 12 hours
Use of pug cutting machine with 50 min / hr working ( 7 x 60 / 50 ) : 8 hours
3. Welding :
Length of welding : 195 m
For stich welding @ 2 hrs usage / shift & @ 15 electrodes / hr
( 116 + 21 ) x 8 / 15 / 2 : 37 hours
For run welding @ 6 hrs usage / shift & @ 15 electrodes / hr
( 1042 + 190 ) x 8 / 15 / 6 : 109 hours
Total : 146 hours
Deploy welding transformer for 146 hours.
Fuel / Energy charges @ 25 % hrs for stitch welding & @ 75 % hrs for run welding.
( 37 x 0.25 + 109 x 0.75 ) : 91 hours
4. Planing SS plates for seal seats :
For surface finishing of SS plates for wheel / seal tracks planing machine is considered.
Length of SS plate for surface finishing by planing machine : 16.3 Rm
Length of planing at a time for 4 m stroke planing machine : 3 Rm
Time for planing 3 m length section with 50 min / hour working : 8 hours
Time for planing 16.3 m SS plates ( 16.3 x 8 / 3 ) : 44 hours
5. Surface cleaning and painting :
Painting area for embedded parts at 5 sqm / tonne : 8 sqm
1 coat of zinc rich epoxy primer 40 micron dry film each coat.
Quantity of primer paint for 8 sqm @ 9 sqm / ltr / coat : 1 ltr
4 coats of coal tar epoxy paint 100 micron dry film each coat.
Quantity of coal tar epoxy paint for 8 sqm @ 6 sqm / ltr / coat : 5.5 ltr
As surface cleaning by sand blasting is hazardous, it is proposed to adopt chemical treatment
to remove grease, rust, scaling etc., and to form phasphate coating to prevent further rusting
before applying primer painting.
Quantity of rust cleaner / inhibitor at 8 sqm / ltr : 1 ltr
6. Requirement of other machinery :
For finishing weld joints / edges 2 hours use of grinding machine considered.
7. Requirement of work force :
Work component Foreman Marker / Gas cutter / Helper
Fabricator / Welder
Erector
Cutting sections 20 hours 1 2 2 5
Fabricating by stitch welding 37 hours 2 5 --- 10
Run welding 109 hours 2 --- 14 14
Erection of Sill beam / Tracks / Guide 1 2 --- 4
Finishing / cleaning --- 1 --- 1
Total : 6 10 16 34
Note : It is assumed that all stitch welding will be done by fabricator. Hence, no separate provision is
considered for welder for stitch welding.
For surface cleaning by chemical cleaner
and wire brushing at 15 sqm / day : 0.5 helper for 8 sqm
For painting 1 coat primer and 4 coats
finishing paint at 15 sqm / day : 3 painter Cl-ll & 0.5 helper for 5 x 8 sqm
8. Excise duty on supply :
Excise duty is applicable on supply of fabricated parts. The cost of materials is inclusive of all
taxes/ duties. Therefore, for purpose of rate analysis 75 percent of total cost excluding the cost
of materials ( assuming 25 % erection cost ) is considered for assessing excise duty.
9. Use rate of materials :
Cost of welding set @ Rs: 3375.00 / Each Rs: 3375.00
Life of welding set : 1000 hours

121
GATES AND HOISTS

Use rate of welding set per hour ( cost / life ) Rs: 3.38
Cost of gas cutting set @ Rs: 1125.00 / Each Rs: 1125
Life of gas cutting set : 600 hours
Use rate of gas cutting set per hr ( cost / life ) Rs: 1.88

RATE ANALYSIS UNIT : 1.685 tonne


A. MATERIALS:
Sl No Perticulars Unit Quantity Rate Amount
in Rs. in Rs.
1 Str steel angle / beam / channel / bars kg 1134.00 20.00 22680.00
2 Structural steel plate / flats kg 523.00 24.00 12552.00
3 Stainless steel plate / flats kg 68.00 90.00 6120.00
Bolt / Nut / Washer ( MS ) kg 1.00 45.00 45.00
5 Oxygen gas cum 30.00 40.00 1200.00
6 Acetyline gas cum 10.00 185.00 1850.00
7 Welding electrodes Nos 116.00 4.00 464.00
8 Welding electrodes ( LH ) Nos 1042.00 6.00 6252.00
9 Welding electrodes ( stainless steel ) Nos 211.00 35.00 7385.00
10 Zinc rich epoxy primer ltr 1.00 525.00 525.00
11 Coal tar epoxy paint ltr 5.50 131.00 720.50
12 Rust cleaner / inhibitor ltr 1.00 175.00 175.00
13 Use rate welding holder set Hour 146.00 3.38 492.75
14 Use rate gas cutting torch set Hour 12.00 1.88 22.50
15 Wire brush Nos 0.50 25.00 12.50
16 Sundries LS 5.00 22.50 112.50
TOTAL Rs: 60608.75
Add for small Tools and Plants @ 1% Rs: 606.09
Add for Contractor' Profit @ 10% Rs: 6060.88
Add for Contrators' Overheads @ 5% Rs: 3030.44
Total cost of Materials Rs: 70306.15

B. MACHINERY:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Welding transformer Hour 146.00 9.00 1314.00
Fuel / Energy charges Hour 91.00 49.00 4459.00
2 Pug cutting machine Hour 8.00 13.00 104.00
Fuel / Energy charges Hour 8.00 2.00 16.00
3 Planing machine Hour 44.00 66.00 2904.00
Fuel / Energy charges Hour 44.00 61.00 2684.00
4 Grinding machine Hour 2.00 15.00 30.00
Fuel / Energy charges Hour 2.00 20.00 40.00
5 Sundries LS 2.00 22.50 45.00
TOTAL Rs: 11596.00
Add for small Tools and Plants @ 1% Rs: 115.96
Add for Contractor' Profit on DPOL / Energy @ 10% Rs: 724.40
Add for Contrators' Overheads @ 5% Rs: 579.80
Total hire charges of Machinery Rs: 13016.16

C. LABOUR:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Crew for Planing machine Hour 44.00 42.75 1881.00
2 Crew for Grinding machine Hour 2.00 35.00 70.00
3 Foreman Day 6.00 108.65 651.90

122
GATES AND HOISTS

4 Marker / Fabricator / Erector Day 10.00 93.70 937.00


5 Gas cutter Day 2.00 93.70 187.40
6 Welder ( General ) Day 12.00 93.70 1124.40
7 Welder ( X - ray ) Day 2.00 103.07 206.14
8 Helper fabrication / erection Day 34.00 81.60 2774.40
9 Helper for cleaning / painting Day 1.00 81.60 81.60
10 Painter Cl - II Day 3.00 81.60 244.80
11 Electrician Day 1.00 82.65 82.65
TOTAL Rs: 8241.29
Add for small Tools and Plants @ 1% Rs: 82.41
Add for Contractor' Profit @ 10% Rs: 824.13
Add for hidden cost on Labour @ 15% Rs: 1236.19
Add for additional hidden cost on labour @ 10% Rs: 824.13
Add for Contrators' Overheads @ 5% Rs: 412.06
Total cost of Labour Rs: 11620.22

ABSTRACT:
A. Cost of Materials Rs: 70306.15
B. Hire charges of Machinery Rs: 13016.16
C. Cost of Labour Rs: 11620.22
Total Rs: 94942.53
Add for excise duty on 75 percent cost
excluding cost of materials @ 18.00% Rs: 3325.91
Add for insurance charges @ 1.00% Rs: 949.43
Add for designs and drawings @ 2.5% Rs: 2373.56
Add for zigs / supports / winches / chain-pulley @ 2.5% Rs: 2373.56
Add for power supply arrangements @ 2.5% Rs: 2373.56
Add for enabling works @ 2% Rs: 1898.85
Total Rs: 108237.41
Add for 2 rehandling leads for 1 km including loading and unloading :
Fabricated parts 2x1.685 tonnes @ Rs: 81.30 / tonne Rs: 273.98
Add for transportation upto work site @ 3% Rs: 3247.12
Total cost for 1.685 tonne Rs: 111758.51
Rate per tonne Rs: 66330.00

SECTION: GATE / HOIST & ALLIED WORKS. YEAR: 2003-2004 ITEM No: 31

ITEM: Design, fabrication, supply, erection, testing and commissioning of sliding type stoplog gate
elements consisting of skin plate, horizontal and vertical girders, slide blocks, stiffeners,
guide shoes, rubber seals etc., with all accessories for canal regulator vent including cost of
all materials, machinery, labour, cutting, aligning, welding, finishing, cleaning, applying one
coats of zinc rich epoxy primer and three coats of cold applied coal tar epoxy paint, seal
fixing etc., complete as per specifications and approved drawings with all leads and lifts.

DATA: Consider down stream sealing vertical lift slide gate. The stoplog gate consists of number
of inter-changeable elements having height of each element in the range of 0.9 to 1.2 m. Each
element consists of skin plate, horizontal girders, vertical end girders, stiffeners, slide blocks,
gate guide shoes, brackets, lifting pins,seals etc., with all accessories.
Consider canal escape / regulator gate for 2 m vent opening and 3.7 m depth of water.
Details of material / Gas cutting / Welding considered for rate analysis are based on stop log
elements drawings for stop log gate of UKP - ALBC escape.
Weight of 1 set of stoplog gate in tonne based on empirical formula :
Weight of 1 set of elements in tonnes = 0.0995 ( L^2 x H x h )^0.716
Where ( L ) is length and ( H ) is total height of gate and ( h ) is head of water in metres.
Weight in tonnes = 0.0995 ( 2.5 x 2.5 x 4.0 x 3.7 ) ^ 0.716 : 2.544
The actual weight of 1 set ( 4 elements ) of stoplog elements as per data sheet: 2.534 tonnes

123
GATES AND HOISTS

Consider actual weight for data rate analysis.


1. Requirement of materials: as per fabrication drawings ( for details refer Item : 31 of Annexer )
a. Structural steel conforming to IS : 2062 :
Angles / Channels / Beams / Bars with 2.5 % wastage : 1195 kg
Plates / flats with 2.5 % wastage : 1376 kg
b. Alluminium/ Bronze alloy components conforming to IS : 305 :
Bronze pads : 16.00 kg
c. Bolts / Nuts / Washers conforming to IS : 1363 :
GI bolts / nuts / washers with 2.5 % wastage : 20.5 kg
MS bolts / nuts / washers with 2.5 % wastage : 6 kg
d. Rubber seal conforming to IS : 11855 :
Bottom seal ( uncladed ) : 8.2 Rm
Side seals ( uncladed ) : 8.25 Rm
e. Welding electrodes :
Welding electrodes for stitch welding at 10 % of total with 2.5 % wastage : 160 Nos
Welding electrodes ( LH ) for run welding at 90 % of total with 2.5 % wastage : 1443 Nos
2. Cutting :
Total length of cutting assuming cutting for 2 sides : 70 Rm
Add for variations ( cutting for more than 2 sides / odd shapes etc ) at 10 % : 7 Rm
Total : 77 Rm
For cutting structural steel sections to required sizes gas cutting is assumed.
Length of steel to be cut by using gas manually : 40 m
Length of steel to be cut by gas using pug cutting machine : 37 m
Time for gas cutting manually assuming average cutting progress of 2 m / hour : 20 hours
Time for gas cutting by pug cutting machine at ( av ) 3 m / hour : 12 hours
Acetelyne gas @ 0.6 cum / hour ( 32 x 0.60 ) : 19 cum
Oxygen gas @ 1.8 cum / hour ( 32 x 1.80 ) : 57 cum
Use of gas cutting torch with 50 min / hr working ( 20 x 60 / 50 ) : 24 hours
Use of pug cutting machine with 50 min / hr working ( 12 x 60 / 50 ) : 14 hours
3. Welding :
Length of welding : 216 Rm
For stich welding @ 2 hrs usage / shift & @ 15 electrodes / hr
( 160 / 15 ) x 8 / 2 : 43 hours
For run welding @ 6 hrs usage / shift & @ 15 electrodes / hr
( 1443 / 15 ) x 8 / 6 : 128 hours
Total : 171 hours
Deploy welding transformer for 171 hours.
Fuel / Energy charges @ 25 % hrs for stitch welding & @ 75 % hrs for run welding.
( 43 x 0.25 + 128 x 0.75 ) : 107 hours
4. Surface cleaning and painting :
Painting area for reulator stoplog gate at 18 sqm / tonne : 45 sqm
1 coat of zinc rich epoxy primer 40 micron dry film each coat.
Quantity of primer paint for 45 sqm @ 9 sqm / ltr / coat : 5 ltr
3 coats of coal tar epoxy paint 100 micron dry film each coat.
Quantity of coal tar epoxy paint for 45 sqm @ 6 sqm / ltr / coat : 23 ltr
As surface cleaning by sand blasting is hazardous, it is proposed to adopt chemical treatment
to remove grease, rust, scaling etc., and to form phasphate coating to prevent further rusting
before applying primer painting.
Quantity of rust cleaner / inhibitor at 8 sqm / ltr : 6 ltr
5. Requirement of other machinery :
For handling of parts during fabrication and erection use of mobile derric crane for 2 hours and
stationery derric crane for 4 hours considered.
For drilling holes in skin plate, end girders and seal clamps use of drilling machine for 8 hours
considered.

124
GATES AND HOISTS

For grinding and finishing weld joints in skin plate and other locations 8 hours use of grinding
machine considered.
6. Requirement of work force :
Work component Foreman Marker / Gas cutter / Helper
Fabricator / Welder
Erector
Cutting sections 38 hours 2 5 5 10
Drilling holes 8 hours 1 1 --- 1
Fabricating by stitch welding 43 hours 3 5 --- 10
Run welding 128 hours 2 --- 16 16
Slide blocks fixing / Seal fixing 1 2 --- 2
Guide shoe fixing / Finishing / Erecting 1 1 --- 2
Total : 10 14 21 41
Note : It is assumed that all stitch welding will be done by fabricator. Hence, no separate provision is
considered for welder for stitch welding.
For surface cleaning by chemical cleaner
and wire brushing at 15 sqm / day : 3 helper for 45 sqm
For painting 1 coat primer and 3 coats
finishing paint at 15 sqm / day : 12 painter Cl-ll & 3 helper for 4 x 45 sqm
7. Excise duty on supply :
Excise duty is applicable on supply of fabricated parts. The cost of materials is inclusive of all
taxes/ duties. Therefore, for purpose of rate analysis 75 percent of total cost excluding the cost
of materials ( assuming 25 % erection cost ) is considered for assessing excise duty.
8. Use rate of materials :
Cost of welding set @ Rs: 3375.00 / Each Rs: 3375.00
Life of welding set : 1000 hours
Use rate of welding set per hour ( cost / life ) Rs: 3.38
Cost of gas cutting set @ Rs: 1125.00 / Each Rs: 1125
Life of gas cutting set : 600 hours
Use rate of gas cutting set per hr ( cost / life ) Rs: 1.88

RATE ANALYSIS UNIT : 2.534 tonne


A. MATERIALS:
Sl No Perticulars Unit Quantity Rate Amount
in Rs. in Rs.
1 Structural steel
Angles / Channels / Beams / Bars kg 1195.00 20.00 23900.00
Plates / flats kg 1376.00 24.00 33024.00
2 Alluminium / Bronze alloy components
Bronze pads kg 16.00 380.00 6080.00
3 Bolt / Nut / Washer
GI bolts / nuts / washers kg 20.50 60.00 1230.00
MS bolts / nuts / washers kg 6.00 45.00 270.00
4 Rubber seals
Bottom seal ( uncladed ) Rm 8.20 120.00 984.00
Side seals ( uncladed ) Rm 8.25 190.00 1567.50
5 Oxygen gas cum 57.00 40.00 2280.00
6 Acetyline gas cum 19.00 185.00 3515.00
7 Welding electrodes Nos 160.00 4.00 640.00
8 Welding electrodes ( LH ) Nos 1443.00 6.00 8658.00
9 Zinc rich epoxy primer ltr 5.00 525.00 2625.00
10 Coal tar epoxy paint ltr 23.00 131.00 3013.00
11 Rust cleaner / inhibitor ltr 6.00 175.00 1050.00
12 Use rate welding holder set Hour 171.00 3.38 577.13

125
GATES AND HOISTS

13 Use rate gas cutting torch set Hour 24.00 1.88 45.00
14 Wire brush Nos 1.00 25.00 25.00
15 Sundries LS 20.00 22.50 450.00
TOTAL Rs: 89933.63
Add for small Tools and Plants @ 1% Rs: 899.34
Add for Contractor' Profit @ 10% Rs: 8993.36
Add for Contrators' Overheads @ 5% Rs: 4496.68
Total cost of Materials Rs: 104323.01

B. MACHINERY:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Welding transformer Hour 171.00 9.00 1539.00
Fuel / Energy charges Hour 107.00 49.00 5243.00
2 Pug cutting machine Hour 14.00 13.00 182.00
Fuel / Energy charges Hour 14.00 2.00 28.00
3 Mobile derric crane Hour 2.00 261.00 522.00
Fuel / Energy charges Hour 2.00 117.00 234.00
4 Stationery derric crane Hour 4.00 50.00 200.00
Fuel / Energy charges Hour 4.00 5.00 20.00
5 Grinding machine Hour 8.00 15.00 120.00
Fuel / Energy charges Hour 8.00 20.00 160.00
6 Drilling machines Hour 8.00 15.00 120.00
Fuel / Energy charges Hour 8.00 20.00 160.00
7 Sundries LS 10.00 22.50 225.00
TOTAL Rs: 8753.00
Add for small Tools and Plants @ 1% Rs: 87.53
Add for Contractor' Profit on DPOL / Energy @ 10% Rs: 607.00
Add for Contrators' Overheads @ 5% Rs: 437.65
Total hire charges of Machinery Rs: 9885.18

C. LABOUR:
Sl No Description Unit Quantity Rate Amount
in Rs. in Rs.
1 Crew for Mobile crane Hour 2.00 32.90 65.80
2 Crew for Drilling machine Hour 8.00 35.00 280.00
3 Crew for Grinding machine Hour 8.00 35.00 280.00
4 Foreman Day 10.00 108.65 1086.50
5 Marker / Fabricator / Erector Day 14.00 93.70 1311.80
6 Gas cutter Day 5.00 93.70 468.50
7 Welder ( General ) Day 14.00 93.70 1311.80
8 Welder ( X - ray grade ) Day 2.00 103.07 206.14
9 Helper fabrication / erection Day 41.00 81.60 3345.60
10 Helper for cleaning / painting Day 6.00 81.60 489.60
11 Painter Cl - II Day 12.00 81.60 979.20
12 Electrician Day 1.00 82.65 82.65
TOTAL Rs: 9907.59
Add for small Tools and Plants @ 1% Rs: 99.08
Add for Contractor' Profit @ 10% Rs: 990.76
Add for hidden cost on Labour @ 15% Rs: 1486.14
Add for additional hidden cost on labour @ 10% Rs: 990.76
Add for Contrators' Overheads @ 5% Rs: 495.38
Total cost of Labour Rs: 13969.70

126
GATES AND HOISTS

ABSTRACT:
A. Cost of Materials Rs: 104323.01
B. Hire charges of Machinery Rs: 9885.18
C. Cost of Labour Rs: 13969.70
Total Rs: 128177.89
Add for excise duty on 75 percent cost
excluding cost of materials @ 18.00% Rs: 3220.41
Add for insurance charges @ 1.00% Rs: 1281.78
Add for designs and drawings @ 2.5% Rs: 3204.45
Add for zigs / supports / winches / chain-pulley @ 2.5% Rs: 3204.45
Add for power supply arrangements @ 2.5% Rs: 3204.45
Add for enabling works @ 2% Rs: 2563.56
Total Rs: 144856.97
Add for 2 rehandling leads for 1 km including loading and unloading :
Fabricated parts 2x2.534 tonnes @ Rs: 81.30 / tonne Rs: 412.03
Add for transportation upto work site @ 3% Rs: 4345.71
Total cost for 2.534 tonne Rs: 149614.71
Rate per tonne Rs: 59040.00

127
GATES AND HOISTS

ANNEXER
TO

GATES AND HOISTS

DETAILS OF MATERIALS / CUTTING / WELDING

128
GATES AND HOISTS

GATES AND HOISTS : REQUIREMENT OF MATERIALS -

1. Embedded parts for spillway radial gates:


Details of materials / Gas cutting / Welding for rate analysis :
Note : 1. Data based on embedded parts drawings for 15 m x 9 m radial gate of Kodasalli dam.
2. Unless otherwise specified 6 mm fillet weld considered for computation of requirement of
welding electrodes.
3. Plate cutting considered for 2 sides assuming other 2 sides free face.
Sl No. DESCRIPTION OF MATERIALS Weight Gas cutting Weld length Number of
in kg length in m in m electrodes
Sill beam / wall plates:
1 Flats 100x100x10 mm 152 Nos 120.00 15.2 1.5 12
2 Flats 100x250x10 mm 26 Nos 43.00 9.1 0.3 3
3 Anchor rods 12 dia 350 mm 152 Nos 48.00 1.8 5.3 43
4 Anchor rods 12 dia 350 mm 52 Nos 16.00 0.6 1.8 15
5 Sill beam ISMB 300 half 2820 mm 2 Nos 130.00 5.6 0.5 8
6 Sill beam ISMB 300 half 2400 mm 4 Nos 221.00 9.6 1.5 24
7 Anchor plate 80x200x10 mm 26 Nos 33.00 2.1 4.2 34
8 Anchor bolts 16 dia 180 mm 52 Nos 15.00 --- 2.6 21
9 Stiffeners 60x135x10 mm 12 Nos 8.00 3.6 6.5 52
10 Stiffeners 60x135x10 mm 12 Nos 8.00 3.6 6.5 52
11 Stiffeners 125x125x10 mm 2 Nos 3.00 0.8 1.2 10
12 Stiffeners 125x125x10 mm 2 Nos 3.00 0.8 1.2 10
13 Anchor bolts 16 dia 190 mm 108 Nos 32.00 --- 5.4 44
14 Anchor bolts 16 dia 430 mm 36 Nos 24.00 --- 1.8 15
15 Seal base 190x200x10 mm 2 Nos 6.00 0.8 ( SV ) 0.8 12
16 Seal base 130x200x10 mm 2 Nos 4.00 0.7 ( SV ) 1.1 17
17 Seal seat SS 80x420x6 mm 2 Nos 3.00 1.0 2.0 16
18 Seal seat SS 100x2640x6 mm 2 Nos 25.00 5.5 10.8 87
19 Seal seat SS 100x2400x6 mm 4 Nos 45.00 10.0 19.6 157
20 Seal seat SS 100x1232x6 mm 16 Nos 93.00 21.3 41.0 328
21 Seal seat SS 100x1208x6 mm 2 Nos 11.00 2.6 5.0 40
22 Seal seat SS 100x350x6 mm 2 Nos 3.00 0.9 1.6 13
23 Cleats ISA 75x75x8 mm 80 mm 108 Nos 77.00 16.2 17.3 139
24 Wall plate base 360x1232x12 mm 16 Nos 668.00 25.5 ( SV ) 5.8 122
25 Wall plate base 360x1365x12 mm 2 Nos 93.00 3.5 ( SV ) 0.8 15
26 Stiffener 80x126x8 mm 16 Nos 99.00 1.3 40.5 324
27 Stiffener 80x1202x8 mm 16 Nos 97.00 1.3 39.8 319
28 Stiffener 80x1173x8 mm 2 Nos 12.00 0.2 4.9 40
29 Stiffener 80x1308x8 mm 2 Nos 13.00 0.2 5.4 44
30 Stiffener 70x222x8 mm 52 Nos 51.00 3.6 37.7 302
31 Stiffener 80x315x8 mm 2 Nos 3.00 0.2 1.9 16
32 Wall plate 350x360x12 mm 2 Nos 24.00 1.4 ( SV ) 0.7 15
33 Splice plate 120x320x6 mm 10 Nos 18.00 4.4 3.2 26
34 Nuts / Washers 16 dia 392 Nos each 17.00 --- --- ---
35 Bolts / Nuts / Washers 16 dia 55 mm 40 6.00 --- --- ---
Anchors / Anchor girders / Yoke girders :
36 Anchor bars 275x8900x40 mm 8 Nos 6148.00 73.4 ( F16 )33.8 2163
37 Anchor girder web 950xx2760x20 mm 2 823.00 7.4 --- ---
38 Flange U / S 200x2760x20 mm 2 Nos 173.00 9.4 ( F8 ) 11.0 165
39 Flange D / S 350x2760x25 mm 2 Nos 379.00 9.7 ( F8 ) 11.0 165
40 Yoke girder web 1160x2440x20 mm 2 Nos 889.00 7.2 --- ---
41 Flange U / S 1000x2440x28 mm 2 Nos 1073.00 10.3 ( F 8 ) 9.8 147
42 Flange D / S 250x2440x20 mm 2 Nos 192.00 8.8 ( F 8 ) 9.8 147
43 Stiffeners 150x950x12 mm 20 Nos 268.00 32.0 48.0 384

129
GATES AND HOISTS

44 Stiffeners 150x200x10 mm 48 Nos 113.00 21.6 33.6 269


45 Stiffeners 475x1160x16 mm 8 Nos 554.00 18.7 28.2 226
46 Stiffeners 475x450x12 mm 24 Nos 483.00 29.4 44.4 356
47 Stiffeners 105x150x10 mm 8 Nos 10.00 3.2 1.9 16
48 Stiffeners 100x1160x12 mm 8 Nos 87.00 0.8 21.8 175
49 Stiffeners 425x1160x12 mm 4 Nos 186.00 8.3 13.7 110
50 Pad plates 380x430x20 mm 4 Nos 103.00 3.2 6.5 52
51 Bolts / Nuts 24 dia 16 Nos 9.00 --- --- ---
Trunnion supports :
52 Thrust plates 700x731x20 mm 2 Nos 166.00 2.9 --- ---
53 Stiffeners 110x288x12 mm 8 Nos 24.00 3.2 6.4 52
54 Stiffeners 120x700x12 mm 6 Nos 47.00 4.9 8.4 68
55 Cleats ISA 75x75x8 mm 80 mm 8 Nos 6.00 1.2 1.4 12
56 Base plate 650x940x20 mm 2 Nos 192.00 3.2 --- ---
57 SS sliding plates 60x570x6 mm 6 Nos 10.00 0.4 7.6 61
58 Stiffeners 140x538x12 mm 6 Nos 43.00 4.1 8.1 65
59 Stiffeners 150x940x12 mm 4 Nos 53.00 4.4 7.5 60
60 Align plate 120x800x12 mm 4 Nos 36.00 3.6 6.4 52
61 Align rod 16 dia 180 mm 8 Nos 2.00 0.4 0.4 4
62 Nuts / Washers 16 dia 16 Nos each 2.00 --- --- ---
63 Align plate 100x100x12 mm 8 Nos 8.00 1.6 --- ---
64 Align rod 45 dia 1778 mm 8 Nos 178.00 1.0 --- ---
65 Nuts / Washers 45 dia 24 Nos / 8 Nos 2.00 --- --- ---
66 Align rod 12 dia 360 mm 8 Nos 3.00 0.5 0.3 3
Total : 14334.00 428.1 600.0 7127
kg Rm Rm Nos
ABSTRACT :
1. Structural steel : IS : 2062
Angles / Beams / Channels / Bars : 679.00 kg
Structural steel Plates / Flats : 13356.00 kg
2. Alloy steel components : IS : 1570
Stainless steel plates / flats : 190.00 kg
3. Bolt / Nut / Washer : IS : 1363
MS Bolts / Nuts / Washers : 109.00 kg
4. Other details :
Length of cutting : 428.10 Rm
Length of welding : 600.00 Rm
Number of electrodes ( str steel ) : 6486 Nos
Number of electrodes ( stainless steel ) 641 Nos

2. Spillway radial gate :


Details of materials / Gas cutting / Welding for rate analysis :
Note : 1. Data based on drawings for 15 m x 9 m radial gate of Kodasalli dam.
2. Unless otherwise specified 6 mm fillet weld considered for computation of requirement of
welding electrodes.
3. Plate cutting considered for 2 sides assuming other 2 sides free face.
Sl No. DESCRIPTION OF MATERIALS Weight Gas cutting Weld length Number of
in kg length in m in m electrodes
Trunnion assembly :
1 Side plate(FS) 1177x1437x25 mm 2 Nos 664.00 6.2 ( F16 ) 2.0 84
2 Side plate(NS) 1177x1272x25 mm 2 Nos 588.00 5.9 ( F16 ) 2.0 84
3 Web plate 490x1119x14 mm 4 Nos 241.00 9.0 23.8 190
4 Web plate 490x969x12 mm 2 Nos 90.00 4.9 10.7 86
5 Hub 590 / 390 / 340 dia 680 mm 2 Nos 1865.00 --- --- ---
6 Stiffener 170x200x16 mm 6 Nos 26.00 2.3 4.5 36
7 Con. Plate 397x720x 25 mm 4 Nos 224.00 5.0 --- ---

130
GATES AND HOISTS

8 Con. Plate 260x720x 20 mm 2 Nos 59.00 2.0 --- ---


9 Stiffener 100x200x10 mm 4 Nos 6.00 1.2 2.4 20
10 Stiffener 170x250x 10 mm 4 Nos 13.00 1.7 3.4 28
11 Stiffener 400x250x10 mm 2 Nos 16.00 1.3 3.6 29
12 Back strip 25x1119x6 mm 4 Nos 5.00 0.1 4.5 36
13 Back strip 25x962x6 mm 4 Nos 5.00 0.1 3.9 32
14 Back strip 25x432x6 mm 4 Nos 2.00 0.1 1.8 15
15 Back strip 25x460x6 mm 4 Nos 2.00 0.1 1.9 15
16 Bracket pl 725x745x36 mm 4 Nos 610.00 11.8 ( F16 ) 12.0 768
17 Plate 775x850x25 mm 2 Nos 259.00 3.3 --- ---
18 Plate 610x850x20 mm 2 Nos 163.00 3.0 --- ---
19 R / F plate 620 dia x 10 mm 2 Nos 47.00 6.0 4.0 32
20 Stiffener 160x716x12 mm 4 Nos 43.00 3.5 8.3 67
21 Stiffener 90x716x16 mm 6 Nos 49.00 0.6 10.8 87
22 Stiffener 60x200x16 mm 4 Nos 6.00 0.3 2.1 17
23 SS plate 40x555x6 mm 6 Nos 6.00 0.3 6.7 54
24 Bush 330/390/620 dia 2 Nos 1128.00 --- --- ---
25 Pin 330 dia x 815 mm 2 Nos 1094.00 --- --- ---
26 Brass washers 590 dia x5 mm 2 Nos 21.00 --- --- ---
27 Keeper pl 120x530x20 mm 2 Nos 20.00 0.3 --- ---
28 Hex screws 24 dia x50 mm 4 Nos 1.00 --- --- ---
29 Plate washer 100x100x25 mm 8 Nos 16.00 1.6 --- ---
30 Tie holder 390x500x32 mm 2 Nos 98.00 2.6 ( F16 ) 4.0 256
31 Stiffener 230x515x16 mm 2 Nos 60.00 3.0 7.8 63
32 Stiffener 165x515x16 mm 2 Nos 21.00 1.5 5.5 44
33 Stiffener 130x515x16 mm 2 Nos 17.00 1.3 5.2 42
34 R/F plate 650 dia 10 mm 2 Nos 6.00 6.0 4.0 32
Trunnion tie beam :
35 ISMC-300 : 6652 mm 2 Nos 483.00 1.2 --- ---
36 ISMC-300 : 8652 mm 2 Nos 628.00 1.2 2.4 40
37 Plate 160x6302x10 mm 2 Nos 158.00 12.9 25.5 204
38 Plate 160x8302x10 mm 2 Nos 196.00 16.9 33.6 269
39 Plate 240x300x8 mm 4 Nos 18.00 2.2 4.3 35
40 Plate 160x700x12 mm 4 Nos 42.00 6.7 6.2 50
41 Plate 55x300x12 mm 4 Nos 6.00 1.5 2.9 24
42 Plate 240x370x12 mm 4 Nos 33.00 2.5 4.9 40
43 Bolts 22 dia x 100 mm 40 Nos 20.00 --- --- ---
Sector arms and bracings :
44 Web plate 500x9716x12 mm 2 Nos 915.00 20.5 --- ---
45 Web plate 500x9766x10 mm 2 Mos 767.00 20.5 --- ---
46 Web plate 516x10286x10 mm 2 Nos 833.00 21.6 --- ---
47 Flange plate 360x9556x20 mm 2 Nos 1080.00 19.9 ( F10 ) 39.7 913
48 Flange plate 340x9606x20 mm 2 Nos 1026.00 19.9 ( F10 ) 39.7 913
49 Flange plate 180x10126x12 mm 2 Nos 344.00 20.6 41.3 331
50 Flange plate 360x9723x20 mm 2 Nos 1099.00 20.2 ( F10 ) 40.4 929
51 Flange plate 340x9773x20 mm 2 Nos 1043.00 20.3 40.5 930
52 Flange plate 180x10293x12 mm 2 Nos 349.00 21.0 41.9 336
53 Pad plate 360x760x25 mm 2 Nos 107.00 2.3 ( F10 ) 5.0 115
54 Pad plate 340x760x25 mm 2 Nos 101.00 2.2 ( F10 ) 5.0 115
55 Pad plate 210x750x20 mm 2 Nos 49.00 2.0 ( F10 ) 5.0 115
56 Pad plate 370x690x25 mm 2 Nos 100.00 2.2 ( F10 ) 4.8 111
57 Pad plate 350x690x25 mm 2 Nos 95.00 2.1 4.8 111
58 Pad plate 220x690x20 mm 2 Nos 48.00 1.8 4.8 111
59 Stiffener 150x250x10 mm 8 Nos 24.00 3.2 6.4 52
60 Stiffener 90x200x10 mm 4 Nos 6.00 1.2 2.3 19
61 Stiffener 80x150x10 mm 6 Nos 6.00 1.4 2.8 23

131
GATES AND HOISTS

62 Stiffener 128x150x10 mm 6 Nos 9.00 1.7 2.8 23


63 Bracing L 100x100x6 - 3530 mm 4 Nos 130.00 0.8 4.0 32
64 Bracing L 100x100x6 - 3776 mm 4 Nos 139.00 0.8 4.0 32
65 Bracing L 75x75x6 - 2642 mm 4 Nos 72.00 0.6 3.5 28
66 Bracing L 75x75x6 - 2995 mm 4 Nos 81.00 0.6 3.5 28
67 Bracing L 75x75x6 - 1714 mm 4 Nos 47.00 0.6 3.5 28
68 Bracing L 75x75x6 - 2161 mm 4 Nos 59.00 0.6 3.5 28
69 Bracing L 75x75x6 - 786 mm 4 Nos 21.00 0.6 3.5 28
70 Bracing L 100x100x6 - 2762 mm 4 Nos 102.00 0.8 4.0 32
71 Bracing L 100x100x6 - 3175 mm 4 Nos 117.00 0.8 4.0 32
72 Bracing L 75x75x6 - 2010 mm 4 Nos 55.00 0.6 3.5 28
73 Bracing L 75x75x6 - 2534 mm 4 Nos 69.00 0.6 3.5 28
74 Bracing L 75x75x6 - 1258 mm 4 Nos 34.00 0.6 3.5 28
75 Bracing L 75x75x6 - 1810 mm 4 Nos 49.00 0.6 3.5 28
76 Bracing L 75x75x6 - 496 mm 4 Nos 13.00 0.6 3.5 28
77 Gusset pl 160x220x8 mm 8 Nos 18.00 4.3 3.5 28
78 Gusset pl 160x280x8 mm 4 Nos 11.00 1.8 2.3 19
79 Gusset pl 160x300x8 mm 4 Nos 12.00 10.9 2.4 20
80 Gusset pl 160x360x8 mm 4 Nos 14.00 2.1 2.9 24
81 Gusset pl 170x410x8 mm 4 Nos 18.00 2.4 3.3 27
82 Gusset pl 170x430x8 mm 4 Nos 18.00 2.4 3.4 28
83 Gusset pl 170x520x8 mm 4 Nos 22.00 2.8 4.1 33
84 Gusset pl 170x500x8 mm 4 Nos 21.00 2.7 4.0 32
85 Gusset pl 160x200x8 mm 8 Nos 16.00 2.9 3.2 26
86 Gusset pl 160x160x8 mm 8 Nos 13.00 2.6 2.5 28
87 Gusset pl 160x270x8 mm 8 Nos 22.00 1.8 4.3 35
88 Gusset pl 170x350x8 mm 4 Nos 15.00 2.1 2.8 23
89 Gusset pl 170x430x8 mm 4 Nos 18.00 2.4 3.4 28
90 Gusset pl 170x540x8 mm 4 Nos 23.00 2.9 4.3 35
91 Stiffener 40x450x8 mm 118 Nos 133.00 4.7 35.4 284
92 Bolts 22 dia x 75 mm Nos 7.00 --- --- ---
93 Bolts 22 dia x 80 mm 17.00 --- --- ---
94 Bolts 27 dia x 100 mm 18.00 --- --- ---
95 Bolts 24 dia x 90 mm 12.00 --- --- ---
Horizontal girders and bracings :
96 Web plate 1200x14840x10 mm 1 No. 1398.00 4.0 --- ---
97 Flange plate 450x14840x20 mm 1 No. 1048.00 15.3 ( F10 ) 29.7 683
98 Flange plate 340x14938x20 mm 1 No. 797.00 15.3 ( F10 ) 29.9 688
99 Flange plate 370x2750x10 mm 2 Nos 159.00 6.3 12.4 100
100 Bracket 700x1085x20 mm 2 Nos 238.00 5.0 ( F10 ) 6.0 138
101 Bracket 700x1200x20 mm 2 Nos 264.00 5.4 6.0 138
102 Stiffener 200x900x12 mm 4 Nos 68.00 4.4 8.8 71
103 Stiffener 428x1300x10 mm 2 Nos 87.00 3.5 2.6 21
104 Stiffener 125x1200x10 mm 6 Nos 70.00 8.0 17.4 140
105 Stiffener 155x1260x20 mm 8 Nos 245.00 11.3 25.1 201
106 Stiffener 150x300x10 mm 12 Nos 42.00 5.4 10.8 87
107 Web plate 1200x14840x10 mm 1 No. 1398.00 4.0 --- ---
108 Flange plate 380x14840x20 mm 1 No 885.00 15.2 ( F10 ) 29.7 683
109 Flange plate 320x13122x20 mm 1 No. 659.00 13.5 ( F10 ) 26.3 605
110 Flange plate 320x1000x20 mm 2 Nos 100.00 2.7 ( F10 ) 4.7 108
111 Flange plate 350x2752x10 mm 2 Nos 151.00 6.2 12.4 100
112 Stiffener 145x1200x10 mm 6 Nos 82.00 8.1 17.9 144
113 Stiffener 145x1260x20 mm 8 Nos 229.00 11.3 24.8 199
114 Stiffener 100x700x10 mm 4 Nos 22.00 3.2 7.2 58
115 Stiffener 100x950x10 mm 4 Nos 30.00 4.2 9.2 74
116 Web plate 800x14840x10 mm 1 No. 932.00 4.0 --- ---

132
GATES AND HOISTS

117 Flange plate 300x14840x16 mm 1 No. 559.00 15.2 ( F10 ) 29.7 683
118 Flange plate 240x12888x16 mm 1 No. 389.00 13.2 ( F10 ) 25.8 594
119 Flange plate 240x1000x16 mm 2 Nos 60.00 2.5 ( F10 ) 4.5 104
120 Flange plate 280x2280x10 mm 2 Nos 100.00 5.1 10.3 83
121 Stiffener 115x800x10 mm 6 Nos 43.00 5.5 12.4 100
122 Stiffener 115x840x16 mm 8 Nos 97.00 7.7 17.1 137
123 Stiffener 120x895x10 mm 2 Nos 17.00 2.1 4.6 37
124 Stiffener 120x1020x10 mm 2 Nos 19.00 2.3 5.0 40
125 Stiffener 100x600x10 mm 4 Nos 19.00 2.8 6.4 52
126 Stiffener 300x300x10 mm 4 Nos 28.00 2.4 4.8 39
127 Bracing L 110x110x8 - 4560 mm 2 Nos 122.00 0.5 1.4 12
128 Bracing L 110x110x8 - 2360 mm 2 Nos 63.00 0.5 1.4 12
129 Bracing L 110x110x8 - 2041 mm 2 Nos 54.00 0.5 1.4 12
130 Bracing L 110x110x8 - 3879 mm 2 Nos 104.00 0.5 1.4 12
131 Bracing L 110x110x8 - 1968 mm 2 Nos 53.00 0.5 1.4 12
132 Bracing L 110x110x8 - 1608 mm 2 Nos 43.00 0.5 1.4 12
133 Bracing L 130x130x8 - 5575 mm 2 Nos 177.00 0.5 1.8 15
134 Bracing L 130x130x8 - 2798 mm 2 Nos 88.00 0.5 1.8 15
135 Bracing L 130x130x8 - 2638 mm 2 Nos 83.00 0.5 1.8 15
136 Bracing L 130x130x8 - 4968 mm 2 Nos 158.00 0.5 1.8 15
137 Bracing L 130x130x8 - 2395 mm 2 Nos 76.00 0.5 1.8 15
138 Bracing L 130x130x8 - 2255 mm 2 Nos 72.00 0.5 1.8 15
139 Bracing L 110x110x8 - 3210 mm 5 Nos 215.00 1.2 3.5 28
140 Bracing L 110x110x8 - 3970 mm 5 Nos 266.00 1.2 3.5 28
141 Bracing L 75x75x8 - 1200 mm 5 Nos 53.00 0.8 2.5 20
142 Bracing L 75x75x8 - 1986 mm 10 Nos 177.00 1.5 5.0 40
143 Bracing L 75x75x8 - 1100 mm 5 Nos 49.00 0.8 2.5 20
144 Bracing L 75x75x8 - 2390 mm 10 Nos 213.00 1.5 5.0 40
145 Gusset pl 180x500x10 mm 5 Nos 35.00 3.4 2.5 38
146 Gusset pl 180x440x10 mm 5 Nos 31.00 3.1 2.2 35
147 Gusset pl 180x570x10 mm 2 Nos 16.00 1.5 1.2 18
148 Gusset pl 200x700x10 mm 1 No. 11.00 0.9 0.7 11
149 Gusset pl 210x700x10 mm 2 Nos 23.00 1.8 1.4 23
150 Gusset pl 180x730x10 mm 2 Nos 21.00 1.9 1.5 24
151 Gusset pl 230x420x10 mm 2 Nos 15.00 1.3 0.9 14
152 Gusset pl 230x400x10 mm 2 Nos 15.00 1.3 0.9 14
153 Gusset pl 230x330x10 mm 2 Nos 12.00 1.2 0.7 11
154 Gusset pl 230x460x10 mm 2 Nos 17.00 1.5 0.9 14
155 Gusset pl 240x460x10 mm 2 Nos 17.00 1.6 0.9 14
156 Gusset pl 200x500x10 mm 4 Nos 31.00 3.0 2.4 39
157 Gusset pl 220x580x10 mm 4 Nos 40.00 3.4 2.8 45
Skin plate and stiffeners :
158 Skin plate 2980x1800x12 mm 2 Nos 1011.00 6.0 8.9 204
159 Skin plate 2100x1600x12 mm 2 Nos 633.00 4.2 6.8 156
160 Skin plate 2400x1800x12 mm 2 Nos 814.00 4.8 7.7 177
161 Skin plate 2980x8415x10 mm 2 Nos 3937.00 6.0 19.6 313
162 Skin plate 2100x9076x10 mm 2 Nos 2992.00 4.2 18.9 302
163 Skin plate 2400x8876x10 mm 2 Nos 3345.00 4.8 19.1 306
164 Stiffener 1/2 ISMB 350-10155 mm 14 Nos 3725.00 71.0 284.0 2272
165 Stiffener 1/2 ISMB 350-10646 mm 22 Nos 6136.00 117.0 468.4 3748
166 Web plate 158x10215x10 mm 2 Nos 253.00 20.8 40.9 327
167 Flange 100x10015x12 mm 2 Nos 189.00 0.2 20.0 160
168 Seal base 25x2980x16 mm 2 Nos 19.00 0.1 11.9 248
169 Seal base 25x2100x16 mm 2 Nos 13.00 0.1 8.4 177
170 Seal base 25x2400x16 mm 2 Nos 15.00 0.1 9.6 202
171 Back strip 40x10215x6 mm 5 Nos 96.00 0.2 102.0 816

133
GATES AND HOISTS

172 Stiffener 60x160x8 mm 204 Nos 123.00 12.3 114.2 914


173 Stiffener 80x158x8 mm 6 Nos 5.00 0.5 3.8 31
174 Diaphragm 170x391x10 mm 6 Nos 31.00 3.4 8.8 71
End shields :
175 Skin plate 2200x3010x10 mm 2 Nos 1040.00 5.0 6.0 96
176 Stiffener L 150x75x8 - 2400 mm 16 Nos 525.00 3.6 6.4 51
177 Shield plate 150 / 715x2300x8mm 2 Nos 125.00 6.9 11.8 130
178 Stiffener L 65x65x6 - 1350 mm 6 Nos 470.00 0.8 16.2 130
179 Stiffener L 65x65x6 - 3450 mm 2 Nos 400.00 0.3 1.6 13
Guide rollers 4 Nos
180 Plates for guide roller assembly 48.00 5.2 2.9 24
181 Guide roller 4 Nos 30.00 --- --- ---
182 Bronze bush 4 Nos 6.00 --- --- ---
183 Pins 4 Nos 4.00 --- --- ---
184 Bolt/Nut/Washer 2.00 --- --- ---
Seal assembly :
185 Bottom seal 100x15000x20 mm 1 No. --- --- --- ---
186 Side seal 12110x20 mm 2 Nos --- --- --- ---
187 Seal clamp 75x1984x16 mm 2 Nos 37.00 0.2 --- ---
188 Seal clamp 75x1998x16 mm 4 Nos 75.00 0.3 --- ---
189 Seal clamp 75x1398x16 mm 2 Nos 26.00 0.2 --- ---
190 Seal clamp 60x1969x16 mm 2 Nos 30.00 0.1 --- ---
191 Seal clamp 60x1998x16 mm 10 Nos 151.00 0.6 --- ---
192 Lock plate 30x120x27 mm 24 Nos 18.00 3.6 --- ---
193 GI Bolts 16 dia x 70 mm 388 Nos 67.00 --- --- ---
194 GI Washers 16 dia 388 Nos 9.00 --- --- ---
Total : 57457.00 927.5 2293.9 26617
kg Rm Rm Nos
ABSTRACT :
1. Structural steel : IS : 2062
Angles / Beams / Channels / Bars : 15421.00 kg
Plates / Flats : 37729.00 kg
2. Cast steel components : IS : 1030
Trunnion hub / Guide roller : 1895.00 kg
3. Alloy steel components : IS : 1570
SS plates / Flats : 6.00 kg
Pins : 1098.00 kg
4. Alluminium / Bronze alloy components : IS : 305
Trunnion & Guide roller bush : 1155.00 kg
5. Bolt / Nut / Washer IS :1363
GI Bolts / Nuts / Washers : 76.00 kg
MS Bolts / Nuts / Washers / Screws : 77.00 kg
6. Rubber seals : IS : 11855
Bottom seal : 15.00 Rm
Side seals : 24.22 Rm
7. Other details :
Length of cutting : 927.50 Rm
Length of welding : 2293.90 Rm
Number of electrodes : 26617 Nos

134
GATES AND HOISTS

3. Rope drum hoist for spillway radial gate :


Details of materials / Gas cutting / Welding for rate analysis :
Note : 1. Data based on 70 t rope drum hoist drawings for 15 m x 9 m radial gate of Kodasalli dam.
2. Unless otherwise specified 6 mm fillet weld considered for computation of requirement of
welding electrodes.
3. Plate cutting considered for 2 sides assuming other 2 sides free face.
Sl No. DESCRIPTION OF MATERIALS Weight Gas cutting Weld length Number of
in kg length in m in m electrodes
Embedments :
1 Anchor bars 25 dia x 1670 mm 24 Nos 154.00 0.6 --- ---
2 Template 180x1290x12 mm 4 Nos 44.00 5.9 --- ---
3 Anchor plate 180x220x20 mm 4 Nos 25.00 1.6 1.2 59
4 Anchor plate 100x180x20 mm 4 Nos 11.00 0.7 0.6 29
5 Anchor bars 20 dia x 490 mm 4 Nos 5.00 0.1 --- ---
6 Washers & Nuts for anchor bars 8.00 --- --- ---
7 Bolts / Washers / Nuts 20 dia 4 Nos 1.00 --- --- ---
8 Pack plate 180x180x6 mm 1 No. 2.00 --- --- ---
Hoist supporting structure :
9 Girder ISMB-450 x 2950 mm 4 Nos 854.00 3.0 --- ---
10 Girder ISMB-300 x 1670 mm 4 Nos 295.00 2.4 --- ---
11 Girder ISMB-300 x 1230 mm 2 Nos 109.00 1.2 --- ---
12 Bracing L 75x75x8 - 1780 mm 2 Nos 32.00 0.3 0.6 5
13 Bracing L 75x75x8 - 1650 mm 6 Nos 88.00 0.9 2.7 22
14 Bracing L 90x90x8 - 2130 mm 2 Nos 46.00 0.4 1.2 10
15 Bracing L 90x90x8 - 1020 mm 2 Nos 22.00 0.4 1.2 10
16 Bracing L 90x90x8 - 970 mm 2 Nos 21.00 0.4 1.2 10
17 Cleats L 75x75x10 - 220 mm 24 Nos 58.00 3.6 17.8 143
18 Stiffener 60x280x10 mm 4 Nos 5.00 0.3 3.2 26
19 Stiffener 65x424x12 mm 48 Nos 125.00 23.5 53.2 426
20 Stiffener 65x137x12 mm 8 Nos 7.00 1.6 4.3 35
21 R / F plate 180x300x16 mm 4 Nos 26.00 1.9 ( F10 ) 3.5 81
22 R / F plate 250x250x16 mm 4 Nos 31.00 2.0 ( F10 ) 4.0 92
23 Gusset plate 170x430x10 mm 2 Nos 12.00 2.0 1.0 23
24 Gusset plate 150x230x8 mm 8 Nos 17.00 3.0 4.3 64
Pulley supporting structure :
25 Girder ISMB-500 - 2040 mm 4 Nos 709.00 4.0 --- ---
26 Flange 500x750x20 mm 4 Nos 236.00 4.8 7.8 180
27 Diaphragm 590x488x12 mm 2 Nos 54.00 2.2 6.3 51
28 Stiffener 80x476x12 mm 18 Nos 65.00 1.5 25.0 200
29 Stiffener 120x510x12 mm 18 Nos 104.00 11.4 27.0 216
30 Diaphragm 545x590x36 mm 2 Nos 182.00 2.3 ( F10 ) 6.4 410
31 Diaphragm 590x769x20 mm 2 Nos 141.00 2.7 ( F10 ) 6.4 148
32 R / F plate 200 dia x 16 mm 4 Nos 20.00 2.5 ( F10 ) 2.5 58
33 Pin 190 dia x 800 mm 2 Nos 356.00 --- --- ---
34 Nuts 130 dia 4 Nos 1.00 --- --- ---
35 Washers 250/132 dia x 10 mm 2 Nos 6.00 2.4 --- ---
36 Washers 250/120 dia x 10 mm 2 Nos 4.00 2.6 --- ---
37 Pin 170 dia x 534 mm 2 Nos 190.00 --- --- ---
38 Keeper pl 60x250x16 mm 4 Nos 8.00 0.3 --- ---
39 Washer 280/172 dia x16 mm 2 Nos 10.00 2.9 --- ---
40 Washer 250/172 dia x 2 mm 2 Nos 2.00 2.6 --- ---
41 Washer 280/172 dia x 2 mm 4 Nos 5.00 2.9 --- ---
42 Plate 200x750x16 mm 2 Nos 38.00 1.9 1.8 15
43 Plate 380x750x16 mm 2 Nos 72.00 2.3 1.8 15
44 Plate 425x1220x10 mm 4 Nos 163.00 6.6 6.6 52
Drive stool :

135
GATES AND HOISTS

45 Pad plate 340x340x12 mm 1 No. 11.00 0.7 1.4 12


46 Pad plate 220x620x12 mm 1 No. 13.00 0.8 0.9 8
47 Pad plate 430x620x12 mm 1 No. 25.00 1.1 2.5 20
48 Pad plate 260x400x12 mm 1 No. 16.00 0.7 1.0 8
49 Web plate 259x1890x8 mm 2 Nos 60.00 2.5 --- ---
50 Flange 90 x 1890x12 mm 2 Nos 31.00 4.0 7.6 61
51 Stiffener 60x251x8 mm 2 Nos 2.00 0.1 1.5 12
52 Stiffener 192x251x8 mm 1 No. 3.00 0.5 1.3 11
53 Stiffener 177x200x8 mm 2 Nos 8.00 0.8 1.8 15
54 Stiffener 177x192x8 mm 1 No. 4.00 0.4 1.1 9
55 Stiffener 100x259x8 mm 4 Nos 7.00 1.4 3.4 28
56 Stiffener 192x259x8 mm 2 Nos 6.00 0.9 2.9 24
57 Stiffener 50x136x8 mm 4 Nos 2.00 0.2 1.9 16
58 Stiffener 136x192x8 mm 2 Nos 3.00 0.7 1.9 16
59 Shim plates 340x340x2/2/1 mm 1 each 5.00 --- --- ---
60 Shim plate 220x620x2/2/1 mm 1 each 5.00 --- --- ---
61 Shim plate 430x620x2/2/1 mm 1 each 10.00 --- --- ---
62 Bolts / Washers / Nuts 6.00 --- --- ---
Gear box :
63 Web plate 532x2358x10 mm 2 Nos 196.00 5.8 9.5 76
64 Web plate 532x410x10 mm 2 Nos 34.00 1.9 1.6 13
65 Web plate 532x1178x10 mm 2 Nos 98.00 3.5 4.7 38
66 Web plate 532x1230x10 mm 2 Nos 102.00 3.5 4.9 40
67 Web plate 532x1300x10 mm 2 Nos 108.00 3.7 5.2 42
68 Web plate 532x1230x10 mm 2 Nos 102.00 3.5 4.7 38
69 Flange pl 140x2358x16 mm 2 Nos 82.00 5.0 9.4 76
70 Flange pl 140x416x16 mm 2 Nos 14.00 1.1 1.6 13
71 Flange pl 140x1178x16 mm 2 Nos 42.00 2.6 4.7 38
72 Flange pl 140x670x16 mm 2 Nos 24.00 1.6 2.7 22
73 Flange pl 140x1300x16 mm 2 Nos 46.00 2.9 5.2 42
74 Flange pl 100x1230x16 mm 2 Nos 44.00 2.5 4.9 40
75 Flange pl 150x2238x12 mm 2 Nos 66.00 4.8 9.3 75
76 Flange pl 150x370x12 mm 2 Nos 10.00 0.8 1.5 12
77 Flange pl 150x1058x12 mm 2 Nos 30.00 2.4 4.3 35
78 Flange pl 150x1280x12 mm 2 Nos 36.00 2.9 5.2 42
79 Flange pl 150x1190x12 mm 2 Nos 68.00 5.4 10.0 80
80 Drum support 400x570x20 mm 4 Nos 144.00 4.5 ( F10 ) 4.0 230
81 Pad plate 100x380x45 mm 4 Nos 56.00 0.4 ( F16 ) 3.9 246
82 Pad plate 120x430x10 mm 4 Nos 16.00 2.2 4.4 36
83 Stiffener 140x240x10 mm 8 Nos 22.00 3.0 8.3 67
84 Stiffener 140x532x10 mm 8 Nos 40.00 5.4 13.0 104
85 Stiffener 100x532x10 mm 24 Nos 100.00 2.4 35.2 282
86 Stiffener 200x200x8 mm 12 Nos 30.00 4.8 14.4 116
87 Flange pl 100x180x12 mm 2 Nos 4.00 0.2 0.7 6
88 Flange pl 100x600x10 mm 2 Nos 1.00 0.2 2.4 20
89 Bolts / Nuts / Washers 10.00 --- --- ---
Floating shaft :
90 Pipe 300 dia x 6671 mm 2 Nos 983.00 --- --- ---
91 Flange pl 440/325 dia x 25 mm 4 Nos 54.00 9.6 ( F16 ) 4.0 252
92 Plate 440 dia x 14 mm 1 No. 17.00 1.4 --- ---
93 Stiffeners 55x100x10 mm 24 Nos 10.00 3.8 3.8 31
94 Plate 300 dia x 8 mm 2 Nos 9.00 2.0 2.0 16
95 Bolts / Nuts / Washers 13.00 --- --- ---

136
GATES AND HOISTS

Gear box coupling :


96 Plate 440/153 dia x 25 mm 2 Nos 54.00 3.7 ( F10 ) 1.9 44
97 Hub 150 dia x 83 mm 2 Nos 20.00 --- --- ---
98 Stiffener 60x140x10 mm 12 Nos 8.00 0.7 4.8 39
Other components :
99 Plummer blocks for drums 4 Nos 192.00 --- --- ---
100 Bronze bush for plummers 4 Nos 32.00 --- --- ---
101 Bolts / Nuts / Washers 12.00 --- --- ---
102 Plummer blocks for gears 4 Nos 110.00 --- --- ---
103 Bronze bush for plummers 4 Nos 28.00 --- --- ---
104 Bolts / Nuts / Washers 7.00 --- --- ---
105 Pulleys 720 PCD 6 Nos 1080.00 --- --- ---
106 Bush for pulleys 6 Nos 84.00 --- --- ---
107 Roap drums 290 dia x 1170 mm 2 Nos 2370.00 --- --- ---
108 Shafts for drums / pinions 557.00 --- --- ---
109 Gears 1310.00 --- --- ---
110 Pinions 218.00
Covers for gear and drive units :
111 ISA 45x45x5 mm 100.00 4.0 4.0 32
112 Plates / Flats 250.00 16.0 20.0 80
113 Round bars 15.00 0.1 0.5 4
114 Bolt/Nut/Washers 10.00 --- --- ---
Other components :
115 Manual operation assembly 124.00 10.0 10.0 230
116 Gate position indicator 25.00 --- --- ---
117 Wire rope 36 mm dia 448.00 --- --- ---
118 Elecon gear units 1000.00 --- --- ---
119 Electric motor 20 hp 1 No. 150.00 --- --- ---
120 Ele-magnetic brake 29.00 --- --- ---
121 Bolts / Nuts / Washers for above 15.00 --- --- ---
Total : 15440.00 254.6 447.2 5177
kg Rm Rm Nos
ABSTRACT :
1. Structural steel : IS : 2062
Angles / Beams / Channels / Bars : 2508.00 kg
Plates / Flats : 3543.00 kg
2. Cast steel components : IS : 1030
Rope drums 2 Nos / Gears 4 Nos : 3680.00 kg
Pinions : 218.00 kg
Pulleys 720 PCD 6 Nos : 1080.00 kg
Plummer blocks / Hubs : 322.00 kg
3. Alloy steel steel components : IS : 1570
Shafts : 557.00 kg
Pins 546.00 kg
4. Alluminium/ Bronze alloy components : IS : 305
Bearings / Bush : 144.00 kg
Bolt / Nut / Washers IS : 1363
MS Bolts / Nuts / Washers : 83.00 kg
5. Wire rope : IS : 2266
36 mm dia 6 / 37 construction 2 Nos : 100 Rm
6. Other components :
Manual operating system : 1 No.
Elecon gears : 2 Nos
Electric motor 20 hp : 1 No.
Gate position indicator : 1 No.
Ele-magnetic brake : 1 No.

137
GATES AND HOISTS

MS pipe 300 mm dia : 13.32 Rm


7. Other details :
Length of cutting : 254.60 Rm
Length of welding : 447.20 Rm
Number of electrodes : 5177 Nos

4. Foot bridge ( catwalk ) at spillway trunnion level :


Details of materials / Gas cutting / Welding for rate analysis :
Note : 1. Data based on 15 m clear span and 1 m wide catwalk drawings of Alamatti dam.
2. Unless otherwise specified 6 mm fillet weld considered for computation of requirement of
welding electrodes.
3. Plate cutting considered for 2 sides assuming other 2 sides free face.
Sl No. DESCRIPTION OF MATERIALS Weight Gas cutting Weld length Number of
in kg length in m in m electrodes
1 ISMB 500 x 17900 mm 2 Nos 3111.00 5.2 2.0 16
2 ISMB 200 x 990 mm 15 Nos 377.00 10.0 6.0 48
3 ISA 75x75x8 x 150 mm 60 Nos 80.00 9.0 36.0 288
4 ISA 75x75x8 x 17900 mm 2 Nos 319.00 1.0 72.0 576
5 ISA 75x75x8 x 1000 mm 30 Nos 267.00 4.5 4.5 36
6 Chequered pl 990 x 17900 mm 1 No. 835.00 20.0 ( F3 ) 20.0 120
7 32 dia pipe 17900 mm 4 Nos 225.00 --- --- ---
8 Plate 300x300x12 mm 8 Nos 68.00 5.0 5.0 40
9 Plate 250x400x12 mm 4 Nos 28.00 2.5 5.2 42
10 Bolt/Nut/Washer 20 dia x 60 mm 16 Nos 8.00 --- --- ---
Total : 5318.00 57.2 130.7 1166
kg Rm Rm Nos
ABSTRACT :
Structural steel : IS : 2062
Angles / Beams / Channels / Bars : 4154.00 kg
Structural steel plates / flats : 96.00 kg
Chequered plates : 835.00 kg
Bolts / Nuts / Washers : IS : 1363
MS Bolts / Nuts / Washers : 8.00 kg
Other components :
MS pipes 32 mm dia : 71.60 Rm
Other details :
Length of cutting : 57.2 Rm
Length of welding : 150.7 Rm
Number of electrodes for 6 mm fillet weld : 1166 Nos

5. Embedded parts for spillway stoplog gate :


Details of materials / Gas cutting / Welding for rate analysis :
Note : 1. Data based on 15 m span spillway stoplog gate embedded parts drawings of Kodasalli dam.
2. Unless otherwise specified 6 mm fillet weld considered for computation of requirement of
welding electrodes.
3. Plate cutting considered for 2 sides assuming other 2 sides free face.
Sl No. DESCRIPTION OF MATERIALS Weight Gas cutting Weld length Number of
in kg length in m in m electrodes
First stage anchors :
1 Anchor plate 80x280x10 mm 36 Nos 63.00 2.9 --- ---
2 Anchor bars dia 12 x 360 mm 72 Nos 26.00 0.9 2.7 22
3 Anchor plate 80x220x10 mm 70 Nos 97.00 5.6 --- ---
4 Anchor bars dia 12 x 360 mm 140 Nos 50.00 1.7 5.3 43
5 Anchor plate 250x250x12 mm 3 Nos 18.00 1.5 --- ---
6 Anchor bars dia 12 x 360 mm 6 Nos 2.00 0.1 0.2 2
Embedded parts :

138
GATES AND HOISTS

7 SS plate 100x2400x6 mm 4 Nos 45.00 0.4 ( F4 ) 19.6 98


8 SS plate 100x2900x6 mm 2 Nos 27.00 0.2 ( F4 ) 11.8 59
9 SS plate 100x2300x6 mm 2 Nos 22.00 0.2 ( F4 ) 9.4 47
10 SS plate 120x2400x12 mm 4 Nos 108.00 10.1 ( F8 ) 19.7 296
11 SS plate 120x2900x12 mm 2 Nos 66.00 6.0 ( F8 ) 11.8 177
12 SS plate 120x2700x12 mm 2 Nos 61.00 5.6 ( F8 ) 11.1 167
13 Track plate 180x2400x32 mm 4 Nos 434.00 10.3 ( DV ) 0.8 53
14 Track plate 180x2900x28 mm 2 Nos 230.00 6.2 ( DV ) 0.4 21
15 Track plate 180x2800x28 mm 2 Nos 222.00 6.0 ( DV ) 0.4 21
16 Tr Angle 150x75x8 x 2400 mm 4 Nos 132.00 0.9 20.1 161
17 Tr Angle 150x75x8 x 2900 mm 2 Nos 79.00 0.5 12.1 97
18 Tr Angle 150x75x8 x 2400 mm 2 Nos 66.00 0.5 10.0 80
19 Stiffener 70x120x8 mm 36 Nos 19.00 2.5 18.7 150
20 Stiffener 85x312x8 mm 24 Nos 40.00 9.5 18.6 149
21 Cleat ISA 75x75x8 x 100 mm 72 Nos 64.00 10.8 14.4 116
22 SS plate 100x2160x6 mm 2 Nos 20.00 0.2 ( F4 ) 8.9 45
23 SS plate 100x2650x6 mm 4 Nos 50.00 0.4 ( F4 ) 22.0 110
24 Sill beam flange 130x2600x12 mm 2 Nos 64.00 5.5 ( DV ) 0.5 7
25 Sill beam flange 130x2650x12 mm 4 Nos 130.00 11.1 ( DV ) 1.0 14
26 Sill beam web 150x2600x10 mm 2 Nos 61.00 5.5 11.0 88
27 Sill beam web 150x2650x10 mm 4 Nos 125.00 11.2 22.4 180
28 Stiffener 60x150x8 mm 12 Nos 7.00 0.7 5.1 41
29 Stiffener 60x180x8 mm 12 Nos 8.00 0.7 5.1 41
30 Anchor plate 80x200x10 mm 30 Nos 38.00 3.0 6.0 48
31 SS plate 112x175x6 mm 2 Nos 2.00 0.6 ( F4 ) 1.2 6
32 Guide plate 140x2625x16 mm 6 Nos 277.00 16.6 ( DV ) 1.7 33
33 Anchor plate 100x220x12 mm 42 Nos 87.00 4.2 8.4 68
34 Anchor bolt dia 16 x 200 mm 144 Nos 46.00 2.3 7.3 59
35 Anchor bolt dia 16 x 185 mm 144 Nos 42.00 2.3 7.3 59
36 Nuts / Washers dia 16 mm 576 each 24.00 --- --- ---
37 Anchor plate 40x250x6 mm 24 Nos 11.00 2.4 3.6 29
38 Guide plate 140x3225x16 mm 2 Nos 113.00 6.7 ( DV ) 0.5 9
Dogging set :
39 Bearing pl 150x200x25 mm 2 Nos 12.00 0.7 --- ---
40 Anchors 60x250x10 mm 4 Nos 5.00 0.3 0.5 4
41 Diaphragm pl 596x790x12 mm 2 Nos 89.00 2.8 1.2 10
42 Beam 150x750x36 mm 2 Nos 64.00 0.9 --- ---
43 R / F plates 130x290x16 mm 4 Nos 19.00 1.7 1.0 8
44 Guide plate 140x220x25 mm 2 Nos 12.00 0.7 ( SV ) 0.5 9
45 Handle / stopper 2.00 --- 0.2 2
Total : 3179.00 162.9 302.5 2629
kg Rm Rm Nos
ABSTRACT :
1. Structural steel : IS : 2062
Angles / Beams / Channels / Bars : 421.00 kg
Plates / Flats : 2245.00 kg
2. Alloy steel components : IS : 1570
SS plates for wheel track 235.00 kg
SS plates for seal seat : 166.00 kg
3. Bolts / Nuts / Washers : IS : 1363
MS Bolts / Nuts / Washers : 112.00 kg
4. Other details :
Length of cutting : 163.00 Rm
Length of welding : 303.00 Rm
Number of electrodes ( for str steel ) : 1624 Nos
Number of electrodes ( stainless steel ) : 1005 Nos

139
GATES AND HOISTS

6. Spillway stoplog gate elements :


Details of materials / Gas cutting / Welding for rate analysis :
Note : 1. Data based on stoplog elements drawings of 15 m spillway opening of Kodasalli dam.
2. Unless otherwise specified 6 mm fillet weld considered for computation of requirement of
welding electrodes.
3. Plate cutting considered for 2 sides assuming other 2 sides free face.
Data for 1 element ( size 15 m x 1.2 m ) : 8 elements considered.
Sl No. DESCRIPTION OF MATERIALS Weight Gas cutting Weld length Number of
in kg length in m in m electrodes
Gate leaf :
1 Skin plate 1200x15620x16 mm 1 No. 2354.00 2.4 ( DV ) 2.4 46
2 Stiffener 80x790x10 mm 36 Nos 179.00 2.9 68.4 548
3 Web plate 1400x15488x10 mm 2 Nos 3404.00 21.6 123.9 992
4 Stiffener 120x1320x10 mm 20 Nos 249.00 28.8 62.4 500
5 Flange 345x15816x20 mm 2 Nos 1713.00 33.0 --- ---
6 Bracing ISA 65x65x6 x 730 mm 4 Nos 17.00 0.5 3.0 24
7 Bracing ISA 65x65x6 x 1339 mm 4 Nos 31.00 0.5 2.5 20
8 Plate 550x1200x16 mm 2 Nos 166.00 3.5 8.0 64
9 Slide block 40x1200x40 mm 2 Nos 30.00 0.1 ( F8 ) 4.8 53
10 Bronze padding for slide blocks 6.00 --- --- ---
11 Seal base 45x1105x12 mm 2 Nos 9.00 2.3 4.4 36
12 Seal support 25x14955x16 mm 1 Nos 47.00 --- 30.0 240
13 Plate 140x140x12 mm 4 Nos 7.00 1.1 2.3 19
14 Pin support 300x523x16 mm 4 Nos 79.00 3.4 6.0 48
15 Pin 80 dia x 160 mm 2 Nos 13.00 --- --- ---
16 Stiffener 340x528x10 mm 2 Nos 28.00 1.8 4.3 35
17 Stiffener 340x740x10 mm 2 Nos 40.00 2.2 5.1 41
18 Cleat ISA 65x65x6 x 150 mm 6 Nos 5.00 0.8 2.2 18
19 Plate 150x150x10 mm 6 Nos 11.00 1.8 2.7 22
20 Stiffener 50x550x12 mm 4 Nos 10.00 0.2 5.2 42
21 Plate 100x14965x10 mm 1 No 117.00 0.2 30.0 240
22 Stiffener 80x150x8 mm 40 Nos 30.00 3.2 18.4 148
23 Plate 120x1004x10 mm 8 Nos 76.00 9.0 19.9 160
Guide Shoe :
24 Plate 200x220x12 mm 4 Nos 17.00 1.7 --- ---
25 Plate 97x220x12 mm 8 Nos 16.00 0.8 1.8 15
26 Plate 28x220x12 mm 4 Nos 2.00 0.6 ( SV ) 1.8 36
27 Plate 92x70x10 mm 8 Nos 4.00 --- 2.9 24
28 Shims 7.00 --- --- ---
29 Bolt/Nut/Washer 20 dia x60 mm 16 Nos 6.00 --- --- ---
Seal assembly :
30 Bottom seal 100x15000x16 mm 1 No --- --- --- ---
31 Side seals 100x1200x12 mm 2 Nos --- --- --- ---
32 Seal clamp 90x1566x16 mm 2 Nos 35.00 --- --- ---
33 Seal clamp 90x1598x16 mm 6 Nos 108.00 --- --- ---
34 Seal clamp 90x1108x16 mm 2 Nos 25.00 --- --- ---
35 Seal clamp 45x1190x16 mm 2 Nos 13.00 --- --- ---
36 GI Bolts / Nuts 16 dia x 80 mm 24 Nos 5.00 --- --- ---
37 GI Bolt / Nuts 16 dia x 75 mm 152 Nos 29.00 --- --- ---
38 Washers 16 dia 176 Nos 2.00 --- --- ---
Total for 1 element 8890.00 122.4 403.4 3371
Total for 8 elements 71120.00 979.2 3227.2 26968
Additional supports for bottom element :
46 ISA 65x65x6 x 1000 mm 3 Nos 37.00 0.4 1.0 8
Total : 71157.00 979.6 3228.2 26976

140
GATES AND HOISTS

kg Rm Rm Nos
ABSTRACT :( For 8 Elements )
1. Structural steel : IS : 2062
Angles / Beams / Channels : 461.00 kg
Plates / Flats : 70208.00 kg
2. Alloy steel components : IS : 1570
Pin : 104.00 kg
3. Alluminium / Bronze alloy components : IS : 305
Bronze pads : 48.00 kg
4. Bolt / Nut / Washer : IS : 1363
GI Bolts / Nuts / Washers : 288.00 kg
MS Bolts / Nuts / Washers : 48.00 kg
5. Rubber seal : IS : 11855
Bottom seal ( uncladed ) : 120.00 Rm
Side seal ( uncladed ) : 19.20 Rm
6. Other details :
Length of cutting : 979.60 Rm
Length of welding : 3228.20 Rm
Number of electrodes : 26976 Nos

7. Lifting beam for spillway stoplog gate elements :


Details of materials / Gas cutting / Welding for rate analysis :
Note : 1. Data based on lifting beam drawings for spillway stoplog elements of Kodasalli dam.
2. Unless otherwise specified 6 mm fillet weld considered for computation of requirement of
welding electrodes.
3. Plate cutting considered for 2 sides assuming other 2 sides free face.
Sl No. DESCRIPTION OF MATERIALS Weight Gas cutting Weld length Number of
in kg length in m in m electrodes
1 Web plate 540x15476x8 mm 2 Nos 1050.00 33.0 ---
2 Flange plate 150x15476x16 mm 4 Nos 1166.00 62.8 123.8 991
3 Stiffener 100x400x10 mm 28 Nos 88.00 2.8 8.7 70
4 End plate 560x1120x12 mm 2 Nos 118.00 3.4 2.3 19
5 Stiffener 250x525x10 mm 4 Nos 41.00 3.1 6.2 50
6 Hook plate 350x625x20 mm 4 Nos 137.00 3.9 4.6 37
7 Stiffener 120x540x10 mm 20 Nos 102.00 13.2 31.2 250
8 Plate 120x125x10 mm 8 Nos 9.00 2.0 3.9 32
9 Plate 200x200x16 mm 4 Nos 20.00 1.6 3.2 26
10 Plate 160x1130x10 mm 4 Nos 57.00 9.5 --- ---
11 Plate 122x165x20 mm 2 Nos 6.00 0.6 0.5 4
12 Plate 60x162x10 mm 4 Nos 3.00 0.9 1.0 8
13 Plate 140x140x20 mm 10 Nos 31.00 2.8 --- ---
14 Plate 200x2071x20 mm 48 Nos 260.00 17.0 --- ---
15 Plate 427x604x25 mm 2 Nos 101.00 3.0 --- ---
16 Hook 315x815x60 mm 2 Nos 100.00 --- --- ---
17 Plate 100x160x20 mm 2 Nos 5.00 0.2 0.5 4
18 Bush dia 105 / 85 x 120 mm 2 Nos 5.00 --- --- ---
19 Pin dia 85 x 268 mm 2 Nos 24.00 --- --- ---
20 Keeper pl 40x140x10 mm 4 Nos 2.00 --- --- ---
21 Pin dia 90 x 285 mm 2 Nos 29.00 --- --- ---
22 Pin dia 120 x 252 mm 1 Nos 22.00 --- --- ---
23 Pin dia 85 x 300 mm 2 Nos 26.00 --- --- ---
24 Guide shoe pl 150x150x12 mm 4 Nos 8.00 1.2 --- ---
25 Guide shoe pl 103x150x12 mm 8 Nos 12.00 2.0 1.2 10
26 Plate 26x150x12 mm 4 Nos 2.00 0.7 ( SV ) 1.2 24
27 Stiffener 40x93x8 mm 8 Nos 2.00 0.5 2.1 17
28 Stiffener 140x120x10 mm 4 Nos 5.00 1.0 1.0 8

141
GATES AND HOISTS

29 Stiffener 120x250x10 mm 2 Nos 5.00 0.8 1.0 8


30 Rod dia 60 x 300 mm 2 Nos 13.00 0.2 0.7 6
31 Stopper pl 60x210x20 mm 2 Nos 4.00 0.2 0.5 4
32 Plate 40x150x12 mm 1 No. 1.00 --- --- ---
33 Bolt/Nut/Washer dia 24 x150 mm 2 Nos 1.00 --- --- ---
34 Bolt/Nut/Washer dia 16 x35 mm 16 Nos 2.00 --- --- ---
35 Plate 210x540x10 mm 8 Nos 71.00 6.0 17.3 139
Total : 3528.00 172.4 210.9 1707
kg Rm Rm Nos
ABSTRACT :
1. Structural steel : IS : 2062
Angle / Channel / Beam / Bar : 13.00 kg
Plates / Flats : 3306.00 kg
2. Alloy steel components : IS : 1570
Pin : 101.00 kg
3. Forged steel components : IS : 2004
Hook : 103.00 kg
4. Alluminium / Bronze alloy components : IS : 305
Bush : 5.00 kg
5. Bolts / Nuts / Washers IS : 1363
MS Bolts / Nuts / Washers : 3.00 kg
6. Other details :
Length of cutting : 172.40 Rm
Length of welding : 210.90 Rm
Number of electrodes : 1707 Nos

8. Spillway gantry crane :


Details of materials / Gas cutting / Welding for rate analysis :
Note : 1. Data based on 25 t spillway gantry crane drawings for Alamatti dam.
2. Unless otherwise specified 6 mm fillet weld considered for computation of requirement of
welding electrodes.
3. Plate cutting considered for 2 sides assuming other 2 sides free face.
Sl No. DESCRIPTION OF MATERIALS Weight Gas cutting Weld length Number of
in kg length in m in m electrodes
Portal :
1 Plate 850/450x2650x10 mm 4 Nos 544.00 16.0 --- ---
2 Plate 1500/850x2800x10 mm 4 Nos 858.00 20.0 ( DV ) 6.8 61
3 Plate 850/650x2700x10 mm 4 Nos 638.00 17.0 ( DV ) 2.6 25
4 Plate 1500/650x2650x10 mm 4 Nos 651.00 18.0 --- ---
5 Plate 320x10700x20 mm 2 Nos 1076.00 22.0 86.0 688
6 Plate 320x2589x20 mm 2 Nos 260.00 5.8 22.0 176
7 Plate 320x1300x20 mm 2 Nos 131.00 3.3 10.4 84
8 Plate 320x1050x20 mm 2 Nos 106.00 2.8 9.7 78
9 Plate 320x2757x20 mm 2 Nos 277.00 6.2 23.4 188
10 Plate 320x1050x20 mm 2 Nos 106.00 2.8 9.7 78
11 Plate 320x282x20 mm 8 Nos 114.00 4.8 ( DV ) 19.3 560
12 Plate 320x728x20 mm 2 Nos 73.00 2.1 6.8 55
13 Plate 320x450x16 mm 4 Nos 73.00 3.1 9.8 79
14 Plate 320x650x16 mm 4 Nos 105.00 3.9 13.0 104
15 Plate 320x500x10 mm 4 Nos 50.00 3.3 6.5 52
16 Plate 280x489x8 mm 2 Nos 17.00 1.5 5.0 40
17 Plate 280x584x8 mm 2 Nos 21.00 1.8 5.8 47
18 Plate 280x725x8 mm 2 Nos 25.00 2.0 6.9 56
19 Plate 280x850x8 mm 6 Nos 90.00 6.8 23.8 191
20 Plate 280x839x8 mm 2 Nos 29.00 2.3 7.8 63
21 Stiffener 280x774x8 mm 2 Nos 27.00 2.1 7.3 59

142
GATES AND HOISTS

22 Stiffener 280x768x8 mm 2 Nos 27.00 2.1 7.3 59


23 Stiffener 280x650x8 mm 2 Nos 23.00 1.9 6.3 51
24 Stiffener 280x635x8 mm 2 Nos 22.00 1.8 6.2 50
25 Stiffener 150x892x10 mm 2 Nos 21.00 2.1 4.8 39
26 Plate 320x4231x16 mm 8 Nos 1361.00 36.4 --- ---
27 Plate 500/380x4230x10 mm 8 Nos 1328.00 40.0 135.4 1084
28 Plate 240x240x10 mm 8 Nos 36.00 3.9 7.7 62
29 Washer dia 160x10 mm 4 Nos 8.00 2.0 2.0 16
30 Stiffener 280x500x8 mm 4 Nos 35.00 3.1 10.2 82
31 Plate 280x468x8 mm 4 Nos 33.00 3.0 9.7 78
32 Plate 280x431x8 mm 4 Nos 30.00 2.9 9.1 73
33 Plate 280x393x8 mm 4 Nos 28.00 2.7 8.5 68
34 Plate 280x380x8 mm 4 Nos 27.00 2.6 8.3 67
35 Flange pl 380x7176x8 mm 2 Nos 342.00 15.1 --- ---
36 Web plate 250x7176x8 mm 2 Nos 225.00 14.9 ( SV ) 28.7 259
37 Stiffener 220x380x8 mm 8 Nos 42.00 4.8 16.2 130
38 Flange pl 412x7176x10 mm 2 Nos 464.00 15.2 --- ---
39 Stiffener 396x450x10 mm 2 Nos 28.00 1.7 3.4 28
40 Web plate 450x7176x8 mm 2 Nos 406.00 15.3 ( SV ) 28.7 259
41 Stiffener 396x450x8 mm 8 Nos 89.00 6.8 20.7 166
42 Web plate 320x7176x10 mm 2 Nos 361.00 15.0 57.4 460
43 Flange pl 510x7176x8 mm 2 Nos 460.00 15.4 --- ---
44 End plate 430x630x12 mm 2 Nos 51.00 2.2 3.4 28
45 Stiffener 284x510x8 mm 2 Nos 18.00 1.6 20.9 168
46 Plate 400x7140x14 mm 2 Nos 628.00 15.0 --- ---
47 Plate 1000x7140x10 mm 2 Nos 1121.00 16.3 ( SV ) 28.6 429
48 Plate 360x1000x8 mm 10 Nos 226.00 13.6 47.2 378
49 Plate 350x460x10 mm 4 Nos 51.00 3.3 6.5 52
50 Pin dia 80 x 520 mm 2 Nos 41.00 --- --- ---
51 Keeper pl 40x130x10 mm 4 Nos 2.00 0.2 --- ---
52 Screw dia 12 x 50 mm 8 Nos 2.00 --- --- ---
53 Plate 255x320x12 mm 16 Nos 123.00 9.2 --- ---
54 Plate 180x450x8 mm 16 Nos 81.00 10.0 --- ---
55 Bolt/Nut/Washer dia 10x40 mm 160 Nos 6.00 --- --- ---
56 Bolt/Nut/Washer dia 16x80 mm 192 Nos 26.00 --- --- ---
57 Plate 350x450x12 mm 4 Nos 60.00 3.2 6.4 52
58 Plate 400x540x16 mm 4 Nos 108.00 3.8 ( F10 ) 7.5 165
59 Plate 270x500x12 mm 4 Nos 52.00 3.1 6.2 50
Long travel wheel bogie :
60 Plate 520x1400x16 mm 4 Nos 366.00 7.7 --- ---
61 Plate 520x1556x16 mm 4 Nos 407.00 8.3 --- ---
62 Plate 500x562x16 mm 4 Nos 141.00 4.3 4.5 36
63 Plate 350x430x16 mm 6 Nos 113.00 4.1 7.3 59
64 Plate 325x606x16 mm 2 Nos 50.00 1.9 3.0 24
65 Plate 176x386x10 mm 6 Nos 32.00 3.4 13.5 108
66 Plate 395x386x10 mm 6 Nos 72.00 4.7 9.5 76
67 Plate 386x520x10 mm 2 Nos 31.00 1.8 2.8 23
68 Plate 100x386x10 mm 4 Nos 12.00 0.4 0.1 1
69 Plate 75x370x10 mm 4 Nos 9.00 0.3 0.8 7
70 Plate 100x370x10 mm 12 Nos 35.00 1.2 13.7 110
71 Plate 85x125x10 mm 24 Nos 20.00 5.0 10.1 81
72 Plate 240x240x10 mm 16 Nos 72.00 7.7 15.4 124
73 Plate 400x515x20 mm 4 Nos 129.00 3.7 ( F8 ) 7.3 110
74 Plate 314x350x20 mm 8 Nos 138.00 5.3 5.6 45
75 Plate 120x120x10 mm 8 Nos 9.00 2.0 3.9 32
76 Plate 125x475x10 mm 8 Nos 37.00 4.8 11.6 93

143
GATES AND HOISTS

77 ISMC100 x 845 mm 2 Nos 16.00 0.4 1.5 12


78 ISMC100 x 845 mm 3 Nos 23.00 0.6 1.0 8
79 ISA 75x75x6 x 560 mm 4 Nos 15.00 0.6 0.6 5
80 Plate 230x440x10 mm 1 No 8.00 0.7 2.0 16
81 Plate 130x360x10 mm 1 No 4.00 0.5 1.0 8
82 Plate 230x270x10 mm 1 No 5.00 0.5 0.8 7
83 Keeper pl 60x200x12 mm 8 Nos 9.00 0.5 --- ---
84 Pin dia 100x515 mm 4 Nos 127.00 --- --- ---
Long travel wheel / gear / pinion / shafts :
85 LT wheel 500 mm dia 8 Nos 1600.00 --- --- ---
86 Wheel pin dia 120 x 442 mm 8 Nos 314.00 --- --- ---
87 Sleeve for pin 150/115 dia x 340 mm 8 No 156.00 --- --- ---
88 Wheel retainer 16 Nos 32.00 --- --- ---
89 Gear 320 PCD x 75 mm 2 Nos 90.00 --- --- ---
90 Sleeve for gear 2 Nos 3.00 --- --- ---
91 Gear shaft 75/60 dia x 440 mm 2 Nos 30.00 --- --- ---
92 Gear retainer 4 Nos 6.00 --- --- ---
93 Rim gear 400 PCD x 80 mm 4 Nos 280.00 --- --- ---
94 Pinion 136 PCD x 80 mm 2 Nos 16.00 --- --- ---
95 Pinion retainer 2 Nos 2.00 --- --- ---
96 Keeper pl 60x190x12 mm 16 Nos 17.00 --- --- ---
97 Plate 50x180x12 mm 16 Nos 14.00 0.8 --- ---
98 Plate 40x130x10 mm 2 Nos 1.00 0.1 --- ---
99 Plate 40x120x10 mm 2 Nos 1.00 0.1 --- ---
100 Bolt/Nut/Washer dia 20x160 mm 48 Nos 22.00 --- --- ---
101 Wheel bearing 16 Nos 80.00 --- --- ---
102 Gear bearing 4 Nos 16.00 --- --- ---
Long travel drive assembly :
103 Motor 5 hp 2 Nos 75.00 --- --- ---
104 Solenoid operated brake 2 Nos 25.00 --- --- ---
105 Worm reducer 2 Nos 500.00 --- --- ---
Trolley structure :
106 ISMB 400 x 1990 mm 2 Nos 246.00 3.0 6.0 48
107 ISMC 300 x 1990 mm 2 Nos 143.00 1.0 4.5 36
108 ISMC 150 x 1980 mm 2 Nos 65.00 0.6 2.4 20
109 ISMC 150 x 1685 mm 4 Nos 111.00 1.2 2.4 20
110 ISMC 150 x 1230 mm 2 Nos 41.00 0.6 2.4 20
111 ISMC 150 x 990 mm 2 Nos 32.00 0.6 2.4 20
112 ISMC 250 x 1265 mm 2 Nos 77.00 0.8 2.8 23
113 ISA 100x100x6 x 1265 mm 8 Nos 94.00 1.6 3.2 26
114 Plate 430x590x10 mm 1 No. 20.00 1.0 1.2 10
115 Plate 360x360x10 mm 1 No. 10.00 0.7 1.1 9
116 Plate 300x500x12 mm 2 Nos 28.00 1.6 2.0 16
117 Web plate 800x7800x10 mm 2 Nos 980.00 17.2 --- ---
118 Flange pl 240x7800x20 mm 2 Nos 588.00 16.1 31.2 250
119 Flange pl 240x6708x20 mm 2 Nos 506.00 13.9 26.9 216
120 Plate 240x457x20 mm 4 Nos 69.00 2.8 4.6 37
121 Plate 240x325x20 mm 4 Nos 49.00 2.3 3.6 29
122 Plate 110x400x10 mm 24 Nos 83.00 12.3 29.8 239
123 Plate 110x800x10 mm 12 Nos 83.00 10.9 24.5 196
124 Plate 110x394x10 mm 10 Nos 14.00 2.0 4.9 40
125 ISA 75x75x6 x 200 mm 4 Nos 6.00 0.6 1.4 12
126 Web plate 400x3550x10 mm 4 Nos 446.00 15.8 --- ---
127 Flange pl 70x3550x16 mm 4 Nos 125.00 14.5 28.4 228
128 Flange pl 70x2778x16 mm 4 Nos 98.00 11.4 22.2 178
129 Flange pl 70x295x16 mm 8 Nos 21.00 3.0 5.3 43

144
GATES AND HOISTS

130 Flange pl 70x370x16 mm 8 Nos 26.00 3.5 6.5 52


131 Plate 100x160x16 mm 16 Nos 32.00 4.2 6.4 52
132 Plate 300x160x16 mm 4 Nos 24.00 1.9 3.7 30
133 End plate 200x320x16 mm 4 Nos 32.00 2.1 4.2 34
134 Stiffener 220x400x8 mm 10 Nos 55.00 6.2 8.0 64
135 Stiffener 90x220x10 mm 4 Nos 6.00 1.3 3.2 26
136 Plate 280x280x20 mm 4 Nos 49.00 2.3 3.4 28
137 Plate 230x380x8 mm 2 Nos 11.00 1.2 2.4 20
138 ISA 100x100x6 x 770 mm 4 Nos 28.00 0.8 1.6 13
139 ISA 100x100x6 x 425 mm 4 Nos 16.00 0.8 1.6 13
140 ISA 100x100x6 x 440 mm 4 Nos 16.00 0.8 1.6 13
141 ISA 100x100x8 x 800 mm 2 Nos 19.00 0.4 3.5 28
142 Plate 85x90x8 mm 4 Nos 2.00 0.7 2.1 17
143 ISA 75x75x6 x 475 mm 2 Nos 7.00 0.3 0.6 5
144 ISMC 150 x 440 mm 2 Nos 15.00 0.6 1.2 10
145 Plate 200x250x10 mm 1 No. 4.00 0.5 0.6 5
End gear box base frame :
146 ISMC 300 x 1750 mm 2 Nos 126.00 1.0 4.8 39
147 ISMC 300 x 1425 mm 2 Nos 103.00 1.0 --- ---
148 ISMC 300 x 1020 mm 2 Nos 74.00 1.0 4.8 39
149 ISMC 300 x 1072 mm 2 Nos 77.00 1.0 4.8 39
150 ISMC 300 x 830 mm 2 Nos 60.00 1.0 4.8 39
151 ISMC 300 x 345 mm 2 Nos 25.00 1.0 4.8 39
152 Plate 110x1750x12 mm 2 Nos 36.00 3.7 1.8 15
153 Plate 110x730x12 mm 2 Nos 15.00 1.7 0.8 7
154 Plate 60x1020x12 mm 2 Nos 12.00 0.2 1.4 12
155 Plate 305x500x20 mm 3 Nos 72.00 2.4 2.7 22
156 Plate 110x325x10 mm 4 Nos 11.00 1.8 2.5 20
157 Plate 180x285x10 mm 12 Nos 48.00 5.6 13.3 107
158 Plate 130x285x10 mm 6 Nos 18.00 2.5 6.1 49
159 Plate 70x160x10 mm 8 Nos 7.00 1.9 3.7 30
160 Plate 70x120x10 mm 4 Nos 3.00 0.8 1.5 12
161 Plate 100x350x10 mm 2 Nos 6.00 0.9 0.8 7
162 Plate 110x1750x20 mm 2 Nos 61.00 3.7 7.0 56
163 Plate 110x1020x20 mm 2 Nos 35.00 2.3 4.1 33
164 Plate 110x830x20 mm 2 Nos 29.00 1.9 3.3 27
Cross travel assembly :
165 Cross travel wheels 450 mm dia 4 Nos 320.00 --- --- ---
166 CT wheel gear 498 PCD x 80 mm 2 Nos 150.00 --- --- ---
167 Pinion and shaft dia 60 x 535 mm 2 Nos 30.00 --- --- ---
168 Driving wheel shaft 435 mm long 2 Nos 48.00 --- --- ---
169 Floating shaft 60 dia x 2536 mm 2 Nos 116.00 --- --- ---
170 Bearing journals 8 Nos 344.00 --- --- ---
171 Idle wheel shaft 270 long mm 2 Nos 32.00 --- --- ---
172 Wheel gear shaft 485 mm long 2 Nos 30.00 --- --- ---
173 Outer retainer dia 220/92x6 mm 8 Nos 16.00 --- --- ---
174 Inner retainer dia 220/117x6 mm 8 Nos 12.00 --- --- ---
175 Pillow block with bronze bush 4 Nos 60.00 --- --- ---
176 Collars dia 115x32 mm 2 Nos 5.00 --- --- ---
177 Flexible coupling 2 Nos 25.00 --- --- ---
178 Flanged coupling 2 Nos 30.00 --- --- ---
179 Flanged coupling 2 Nos 70.00 --- --- ---
Drum and gear assembly :
180 Rope drum 600 PCD x 1095 mm 2 Nos 1320.00 --- --- ---
181 Drum hub bush 2 Nos 10.00 --- --- ---
182 Drum gear 876 PCD x 1351 mm 2 Nos 330.00 --- --- ---

145
GATES AND HOISTS

183 Second gear 570 PCD x 60 mm 2 Nos 160.00 --- --- ---
184 Bearing bush 2 Nos 4.00 --- --- ---
185 Pinion 1st reduction 216 PCD 2 Nos 64.00 --- --- ---
186 Pinion 2nd reduction 190 PCD 2 Nos 26.00 --- --- ---
187 Drum shaft 2 Nos 146.00 --- --- ---
188 Pinion shaft 2 Nos 76.00 --- --- ---
189 Third shaft 2 Nos 48.00 --- --- ---
190 Plummer blocks 8 Nos 120.00
191 Flexible coupling 2 Nos 25.00 --- --- ---
192 Drum spacers 4 Nos 28.00 --- --- ---
193 Clamp 100x150x25 mm 4 Nos 12.00 0.4 --- ---
194 Bolt / Nut dia 20 x 100 mm 12 Nos 3.00 --- --- ---
195 Bolt / Nut dia 20 x 80 mm 8 Nos 2.00 --- --- ---
198 Keys ( various size ) 8 Nos 3.00 --- --- ---
199 Keeper pl 50x295x12 mm 4 Nos 6.00 0.2 --- ---
Sheave assembly :
200 Plate 760x1680x12 mm 2 Nos 200.00 6.0 --- ---
201 Plate dia 300 x 8 mm 4 Nos 18.00 3.8 3.8 31
202 Plate 50x210x10 mm 1 No. 1.00 --- --- ---
203 ISA 75x75x6 x 75 mm 2 Nos 1.00 0.3 0.6 5
204 Plate 232/126x 950x3 mm 2 Nos 10.00 2.0 2.0 16
205 Main sheave 500 mm dia 2 Nos 200.00 --- --- ---
206 Balancing sheave 320 mm dia 1 No. 75.00 --- --- ---
207 Sheave bearing bush 6 Nos 50.00 --- --- ---
208 Main sheave pin 2 Nos 57.00 --- --- ---
209 Balancing sheave pin 1 No. 26.00 --- --- ---
210 Hook cross piece 1 No. 10.00 --- --- ---
211 Shanh hook 1 No. 100.00 --- --- ---
212 Hook nut 1 No. 17.00 --- --- ---
213 Hook lock pl 1 No. 20.00 --- --- ---
214 Keeper plates 8 Nos 5.00 0.4 --- ---
215 Plate 230x230x8 mm 2 Nos 7.00 1.8 1.8 15
216 Thruster bearing for hook 1 No. 5.00 --- --- ---
217 Wire rope 28 mm dia 6/37 con 150 m 406.00 --- --- ---
Trolley drive :
218 Motor 3 hp for cross travel drive 1 No. 25.00 --- --- ---
219 Motor 17.5 hp for load 1 No. 75.00 --- --- ---
220 Worm reducer 2 Nos 800.00 --- --- ---
221 Thruster brake 1 No. 25.00 --- --- ---
222 Solenoid operated brake 1 No. 25.00 --- --- ---
223 Brake for CT 1 No. 25.00 --- --- ---
Platform / Ladder :
224 Chequered pl 6 mm th 16 sqm 800.00 18.0 2.0 16
225 ISA 60x60x6 mm Hand railing 12 Rm 64.00 1.5 2.5 20
226 Pipe 32 mm dia for railing/ ladder 50 Rm 150.00 --- --- ---
227 Angles for cabin / ladder / covers etc 200.00 1.0 2.0 16

146
GATES AND HOISTS

228 Plates for cabin / covers 270.00 17.5 12.6 101


30856.00 760.6 1260.0 10960
kg Rm Rm Nos
ABSTRACT :
1. Structural steel : IS : 2062
Angle / Channel / Beam / Bars : 1700.00 kg
Plates / Flats : 19219.00 kg
Chequered plate for platform covering : 800.00 kg
2. Cast steel components : IS : 1030
Rope drums : 1320.00 kg
Gears : 1016.00 kg
Wheels with retainers : 1980.00 kg
Pinions : 149.00 kg
Pulley / sheave : 275.00 kg
Plummer blocks / Bearing journals : 508.00 kg
Couplings / Sleeves : 309.00 kg
3. Alloy steel components : IS : 1570
Pins : 524.00 kg
Shafts : 556.00 kg
4. Forged steel components : IS : 2004
Hook : 127.00 kg
5. Alluminium / Bronze alloy components : IS : 305
Bearings / Bushes : 181.00 kg
6. Wire rope : IS : 2266
28 mm dia 6/37 construction : 150 Rm
7. Bolts / Nuts / Washers : IS : 1363
MS Bolts / Nuts / Washers : 61.00 kg
8. Other components :
Electric motor 3 hp : 1 No.
Electric motor 5 hp : 2 Nos.
Electric motor 17.5 hp : 1 No.
Worm reducer : 4 Nos
Brakes 4 Nos : 4 Nos
Pipe 32 mm dia for railing / ladder : 50 Rm
9. Other details :
Length of cutting : 760.60 Rm
Length of welding : 1260.00 Rm
Number of electrodes : 10960 Nos

9. Rail track for Spillway gantry crane :


Details of materials / Gas cutting / Welding for rate analysis :
Note : 1. Data based on 200 m length spillway gantry crane rail track drawings of Kodasalli dam.
2. Unless otherwise specified 6 mm fillet weld considered for computation of requirement of
welding electrodes.
3. Plate cutting considered for 2 sides assuming other 2 sides free face.
Sl No. DESCRIPTION OF MATERIALS Weight Gas cutting Weld length Number of
in kg length in m in m electrodes
1 Track rail 45 kg / m 2 x 200 m 18000.00 --- --- ---
2 Anchor rod dia 16 x 430 mm 1068 Nos. 726.00 17.0 53.6 429
3 Cleat ISA 65x65x6 x 260 mm 534 Nos. 805.00 69.5 ---
4 Packing plate 50x50x10 mm 1068 Nos 210.00 53.4 53.4 427
5 Clamp 50x90x8 mm 1068 Nos 302.00 53.4 53.4 427
6 Bolt 60 mm / Nut / Washer 16 dia 1068 240.00 --- --- ---
7 Plate 180x1200x12 mm 20 Nos 407.00 27.6 48.0 384

147
GATES AND HOISTS

8 Buffers 150x190x36 mm 4 Nos 32.00 1.4 ( F16 ) 1.5 95


Total : 20722.00 222.3 209.9 1762.00
kg Rm Rm Nos
ABSTRACT :
1. Structural steel : IS : 2062
Angles / Beams / Channels / Bars : 1531.00 kg
Plates / Flats : 951.00 kg
2. Bolts / Nuts / Washers : IS : 1363
MS Bolts / Nuts / Washers : 240.00 kg
3. Other components :
Rails 45 kg / m : 18000.00 kg
4. Other details :
Length of cutting : 222.30 Rm
Length of welding : 209.90 Rm
Number of electrodes : 1762 Nos

10. Embedded parts without groove lining for river / canal sluice service gate :
Details of materials / Gas cutting / Welding for rate analysis :
Note : 1. Data based on emedded parts drawings for river sluice service gate of Upper Tunga dam.
2. Unless otherwise specified 6 mm fillet weld considered for computation of requirement of
welding electrodes.
3. Plate cutting considered for 2 sides assuming other 2 sides free face.
Sl No. DESCRIPTION OF MATERIALS Weight Gas cutting Weld length Number of
in kg length in m in m electrodes
First stage anchors :
1 Anchor plate 100x210x10 mm 28 Nos 46.00 8.7 5.6 45
2 Anchor bar 12 dia x 350 mm 56 Nos 18.00 0.7 1.0 17
3 Anchor plate 100x180x10 mm 24 Nos 34.00 6.7 4.8 38
4 Anchor bar 12 dia x 350 mm 48 Nos 15.00 0.6 1.8 15
5 Anchor plate 80x515x8 mm 10 Nos 26.00 6.0 3.6 29
6 Anchor bar 12 dia x 350 mm 20 Nos 6.00 0.3 0.8 6
7 Anchor plate 80x150x10 mm 20 Nos 19.00 1.6 --- ---
8 Anchor bar 12 dia x 350 mm 40 Nos 13.00 0.5 1.5 12
9 Anchor plate 80x150x10 mm 24 Nos 23.00 1.9 --- ---
10 Anchor bar 12 dia x 350 mm 48 Nos 15.00 0.6 1.8 14
11 Anchor plate 100x210x10 mm 20 Nos 33.00 2.0 --- ---
12 Anchor bar 12 dia x 350 mm 40 Nos 13.00 0.5 1.5 12
Embedded parts :
13 Anchor bolt 16 dia x 285 mm 48 Nos 22.00 0.8 2.4 19
14 Anchor bolt 16 dia x 200 mm 8 Nos 2.00 0.1 0.4 3
15 Anchor bolt 16 dia x 185 mm 20 Nos 6.00 0.3 1.0 8
16 Anchor bolt 16 dia x 500 mm 24 Nos 18.00 0.4 1.2 10
17 Alignment plate 100x210x10 mm 28 Nos 46.00 2.8 --- ---
18 Alignment plate 100x180x10 mm 24 Nos 34.00 2.4 --- ---
19 Alignment plate 80x515x8 mm 10 Nos 26.00 0.8 --- ---
20 Split anchor plate 60x400x6 mm 20 Nos 23.00 10.4 3.6 29
21 Nut / Washer for anchor bolts 200 Nos 10.00 --- --- ---
22 SS track 115x6750x10 mm 2 Nos 122.00 13.7 27.5 220
23 Track base 130x7100x12 mm 2 Nos 174.00 14.5 28.4 227
24 Track base ISMB 200x7100 mm 2 Nos 360.00 0.6 --- ---
25 Sill beam ISMB 200x2300 mm 1 No. 58.00 0.3 --- ---
26 SS seal seat 115x2300x6 mm 1 No. 12.00 2.4 ( F4 ) 4.6 23
27 SS seal seat 80x3035x5 mm 2 Nos. 19.00 6.3 ( F4 ) 12.2 61
28 Seal base ISA100x100x8 x3020 mm 2 No 73.00 0.4 --- ---
29 SS seal seat 1680x1985x5 mm 1 No. 131.00 3.7 ( F4 ) 7.4 37
30 SS seal seat 1680x1975xx5 mm 1 No. 130.00 3.7 ( F4 ) 7.3 37

148
GATES AND HOISTS

31 Seal base 1700x2000x20 mm 2 Nos 1068.00 7.4 --- ---


32 Guide 120x2200x20 mm 2 Nos 82.00 4.7 --- ---
33 Guide 120x2400x20 mm 4 Nos 180.00 10.1 --- ---
34 Stiffener 130x1700x20 mm 1 No. 35.00 2.0 3.4 27
35 Stiffener 120x390x8 mm 8 Nos 24.00 4.1 10.1 81
36 Stiffener 130x1700x10 mm 3 Nos 52.00 5.5 10.2 82
37 Stiffener 120x1960x10 mm 10 Nos 184.00 20.8 44.0 352
38 Cleat ISA75x75x8 x 80 mm 24 Nos 17.00 3.6 4.8 38
39 Spacer pipe/ washer 20 dia x 20 mm 1.00 --- --- ---
40 Bolt / Nut / Washer 16 dia x 60 mm 8 No 2.00 --- --- ---
Total : 3172.00 151.9 190.9 1442.0
kg Rm Rm Nos
ABSTRACT :
1. Structural steel : IS : 2062
Angle / Channel / Beam / Bars : 588.00 kg
Plates / Flats : 2109.00 kg
2. Alloy steel components : IS : 1570
Stainless steel plates : 414.00 kg
3. Bolt / Nut / Washer : IS : 1363
MS Bolt / Nut / Washer : 61.00 kg
4. Other details :
Length of cutting : 152.00 Rm
Length of welding : 191 Rm
Number of electrodes ( str steel ) : 1064 Nos
Number of electrodes ( stainless steel ) : 378 Nos

11. Embedded parts with groove lining for river / canal sluice service gate :
Details of materials / Gas cutting / Welding for rate analysis :
Note : 1. Data based on emedded parts drawings for river sluice service gate of Kodasalli dam.
2. Unless otherwise specified 6 mm fillet weld considered for computation of requirement of
welding electrodes.
3. Plate cutting considered for 2 sides assuming other 2 sides free face.
Sl No. DESCRIPTION OF MATERIALS Weight Gas cutting Weld length Number of
in kg length in m in m electrodes
First stage anchors :
1 Plate 80x210x10 mm 162 Nos 214.00 13.0 --- ---
2 Anchor bar 12 dia x 350 mm 324 Nos 100.00 3.9 12.2 98
3 Plate 80x80x10 mm 82 Nos 41.00 6.6 --- ---
4 Anchor bar 12 dia x 350 mm 82 Nos 25.00 1.0 3.1 25
Embedded parts :
5 SS seal seat 100x2800x6 mm 1 No. 13.00 0.1 ( F4 ) 5.8 29
7 Liner plate 666x3550x20 mm 1 No. 371.00 4.2 --- ---
10 Stiffener 220x3520x10 mm 1 Nos 61.00 3.8 7.0 56
11 Stiffener 120x3520x10 mm 1 Nos 33.00 3.7 7.0 56
13 Stiffener 155x420x8 mm 3 Nos 12.00 1.7 4.4 36
15 Cleat ISA 75x75x8 x 80 mm 44 Nos 31.00 6.6 8.3 67
16 SS B/W seat 1300x2720x6 mm 1 No. 167.00 4.0 ( F4 ) 8.0 40
17 SS B/W seat 1976x2720x6 mm 1 No. 253.00 4.7 ( F4 ) 9.4 47
18 Base plate 2000x2750x20 mm 1 No. 864.00 4.8 ( DV ) 2.8 87
19 base plate 2000x3640x20 mm 1 No. 1143.00 5.7 --- ---
20 Bottom liner Gr 484x2600x20 mm 1 No. 198.00 3.1 5.2 42
21 Stiffener 180x1898x10 mm 7 Nos 188.00 14.5 26.6 213
22 Stiffener 180x1960x10 mm 7 Nos 194.00 15.0 27.4 220
23 Stiffener 100x2570x10 mm 1 No. 20.00 0.1 5.2 42
24 Stiffener 100x410x10 mm 30 Nos 97.00 3.0 36.6 293
25 SS track plate 150x3000x20 mm 2 Nos 141.00 6.3 ( F8 ) 12.3 185

149
GATES AND HOISTS

26 Track base pl 200x3000x40 mm 2 Nos 377.00 6.4 ( DV ) 0.4 56


27 Web plate 320x3000x20 mm 2 Nos 301.00 6.7 12.7 102
28 Track ISMB 150 x 4200 mm 8 Nos 504.00 2.4 ( DV ) 2.4 36
29 Anchor plate 80x200x10 mm 66 Nos 83.00 5.3 10.5 84
30 Anchor plate 80x200x12 mm 80 Nos 121.00 6.4 12.8 103
31 Guide 110x2050x16 mm 20 Nos 566.00 43.2 ( Dv ) 2.2 86
32 Anchor bolt 16 dia x 300 mm 12 Nos 6.00 0.2 0.6 5
33 Anchor bolt 16 dia x 185 mm 180 Nos 53.00 2.9 9.0 72
34 Anchor bolt 16 dia x 135 mm 112 Nos 24.00 0.4 5.6 45
35 Anchor bolt 16 dia x 380 mm 32 Nos 20.00 0.5 1.6 13
36 Nut / Washer for 16 dia bolt 672 Nos 29.00 --- --- ---
37 Cover plate 270x290x10 mm 4 Nos 25.00 2.3 --- ---
38 Back strip 40x2610x6 mm 2 Nos 10.00 0.1 5.2 42
39 Split anchor 80x400x8 mm 25 Nos 50.00 4.0 5.5 44
40 Bolt/Nut/Washer 25 diax65 mm 24 Nos 7.00 --- --- ---
41 Track base pl 220x4767x40 mm 2 Nos 659.00 10.0 --- ---
42 Track web pl 320x4767x20 mm 2 Nos 479.00 10.2 ( Dv ) 19.0 589
43 SS track plate 170x4150x20 mm 2 Nos 222.00 8.7 ( F8 ) 17.3 260
44 Side plate 210x3917x20 mm 2 Nos 258.00 8.3 15.7 126
45 Side plate 115x3029x20 mm 2 Nos 109.00 6.3 12.1 97
47 Stiffener 260x295x8 mm 8 Nos 39.00 4.5 8.9 72
48 Stiffener 210x260x8 mm 4 Nos 14.00 1.9 3.8 31
49 Stiffener 210x260x10 mm 2 Nos 9.00 1.5 2.6 21
50 Anchor plate 80x200x10 mm 16 Nos 20.00 1.3 2.6 21
51 Groove lining 560x3915x20 mm 2 Nos 688.00 9.0 17.9 144
52 Guide 40x3878x16 mm 2 Nos 39.00 0.1 15.5 124
53 Stiffener 100x3915x10 mm 2 Nos 61.00 0.2 16.0 128
54 Stiffener 100x3841x10 mm 2 Nos 60.00 0.2 15.8 127
55 Stiffener 120x3878x10 mm 2 Nos 73.00 8.0 15.5 124
56 Stiffener 110x265x8 mm 16 Nos 29.00 6.0 12.0 96
57 Cleat ISA 75x75x6 x 80 mm 28 Nos 15.00 4.0 7.5 60
58 SS seal seat 100x3052x6 mm 2 Nos 29.00 0.2 ( F4 ) 12.6 63
59 Liner plate 570x3029x20 mm 2 Nos 542.00 7.2 ( SV ) 1.2 60
61 Stiffener 120x3024x10 mm 2 Nos 57.00 6.3 12.5 100
62 Stiffener 330x220x10 mm 6 Nos 34.00 3.3 7.9 64
64 Stiffener 460x820x10 mm 3 Nos 89.00 3.9 7.3 59
66 Stiffener 80x975x10 mm 8 Nos 49.00 0.7 16.9 136
68 Stiffener 80x988x10 mm 4 Nos 25.00 0.3 8.8 71
69 B/W liner 800x2780x20 mm 1 No. 349.00 3.6 7.2 58
70 B/W liner 484x2780x20 mm 1 No. 211.00 3.3 6.5 52
71 Stiffener 100x2740x10 mm 1 No. 43.00 0.2 5.5 44
72 Stiffener 100x1245x10 mm 2 Nos 10.00 0.1 5.8 47
73 Anchor bolt 16 dia x 185 mm 32 Nos 9.00 0.5 1.6 13
74 Anchor bolt 16 dia x 355 mm 28 Nos 16.00 0.5 1.4 12
75 Anchor bolt 16 dia x 450 mm 12 Nos 9.00 0.2 0.6 5
76 Nut / Washer for 16 dia bolt 144 Nos 7.00 --- --- ---
78 Back strip 40x3027x8 mm 6 Nos 46.00 0.3 18.2 146
79 Cleat ISA 75x75x6 x 80 mm 12 Nos 6.00 1.8 1.9 16
80 Stiffener 110x195x10 mm 6 Nos 10.00 1.8 3.7 30
Total : 10657.00 301.0 551.6 5220.0
kg Rm Rm Nos

150
GATES AND HOISTS

ABSTRACT :
1. Structural steel : IS : 2062
Angle / Channel / Beam / Bars : 681.00 kg
Plates / Flats : 8971.00 kg
2. Alloy steel components : IS : 1570
Stainless steel plates : 825.00 kg
3. Bolt / Nut / Washer : IS : 1363
MS Bolt / Nut / Washer : 180.00 kg
4. Other details :
Length of cutting : 301.00 Rm
Length of welding : 552 Rm
Number of electrodes ( str steel ) : 4596 Nos
Number of electrodes ( stainless steel ) : 624 Nos

12. Vent lining for river / canal sluice vents.


Details of materials / Gas cutting / Welding for rate analysis :
( For 38.50 sqm finished lining area )
Note : 1. Data based on groove / vent lining drawings for 2 m x 3 m river sluice vents of Kodasalli dam.
2. Unless otherwise specified 6 mm fillet weld considered for computation of requirement of
welding electrodes.
3. Plate cutting considered for 2 sides assuming other 2 sides free face.
Sl No. DESCRIPTION OF MATERIALS Weight Gas cutting Weld length Number of
in kg length in m in m electrodes
Vent liner parts :
1 Liner plate 454x2610x20 mm 1 No. 186.00 3.1 5.2 42
2 Liner plate 429x2610x20 mm 1 No. 176.00 3.1 5.2 42
3 Stiffener 110x2580x10 mm 4 Nos 89.00 10.8 20.6 165
4 Stiffener 139x294x8 mm 3 Nos 8.00 1.3 3.4 28
5 Stiffener 139x299x8 mm 3 Nos 8.00 1.3 3.5 28
6 Side plate 225x3062x20 mm 2 Nos 216.00 6.6 12.3 99
7 Liner plate 250x3064x20 mm 2 Nos 240.00 6.7 25.0 200
8 Stiffener 70x80x8 mm 48 Nos 17.00 3.9 14.4 116
9 Side liner 230x1020x20 mm 8 Nos 295.00 10.0 20.0 160
10 Plate 230x1018x20 mm 4 Nos 147.00 5.0 10.0 80
11 Side lining D/S 2525x3358x20 mm 2 Nos 2662.00 11.8 33.6 269
12 Top/bottom liner 2547x2580x20 mm 2 No. 2063.00 10.3 10.3 83
13 Stiffener 120x2780x10 mm 12 Nos 314.00 34.8 66.7 534
14 Stiffener 120x3066x10 mm 12 Nos 347.00 38.3 73.6 589
15 Stiffener 160x455x8 mm 60 Nos 274.00 36.9 93.0 744
16 Split anchor 80x400x8 mm 119 Nos 239.00 19.0 22.6 181
Total : 7281.00 202.9 419.4 3360.0
kg Rm Rm Nos
ABSTRACT :
1. Structural steel : IS : 2062
Plates / Flats : 7281.00 kg
2. Other details :
Length of cutting : 203 Rm
Length of welding : 420 Rm
Number of electrodes ( str steel ) : 3360 Nos

13. River / canal sluice service gate :


Details of materials / Gas cutting / Welding for rate analysis :
Note : 1. Data based on river sluice service gate drawings 2 m x 3 m sluice opening of Kodasalli dam.
2. Unless otherwise specified 6 mm fillet weld considered for computation of requirement of
welding electrodes.
3. Plate cutting considered for 2 sides assuming other 2 sides free face.

151
GATES AND HOISTS

Sl No. DESCRIPTION OF MATERIALS Weight Gas cutting Weld length Number of


in kg length in m in m electrodes
Gate leaf :
1 Skin plate 3220x3372x18 mm 1 No. 1534.00 6.6 --- ---
2 Ver stiffener 140x688x10 mm 28 Nos 212.00 23.2 54.2 434
3 Web plate 350x688x10 mm 6 Nos 114.00 6.2 16.7 134
4 Web plate 350x688x10 mm 2 Nos 38.00 2.0 5.8 47
5 Girder web 350x2788x12 mm 4 Nos 368.00 12.5 50.2 402
6 Girder web 390x2788x12 mm 1 No 102.00 3.2 7.1 57
7 Flange plate 320x2788x20 mm 4 Nos 560.00 12.5 ( SV ) 2.6 130
8 Flange plate 250x2788x20 mm 1 No. 109.00 3.0 ( SV ) 3.3 165
9 End plate 370x3251x12 mm 4 Nos 453.00 14.5 26.0 208
10 Flange plate 150x380x12 mm 6 Nos 32.00 3.2 6.4 52
11 Flange plate 150x152x12 mm 2 Nos 4.00 0.6 1.2 10
12 Flange plate 80x380x18 mm 6 Nos 26.00 0.5 ( SV ) 3.2 100
13 Flange plate 80x152x18 mm 2 Nos 4.00 0.2 ( SV ) 1.0 31
14 End ver plate 80x3170x18 mm 2 Nos 72.00 0.2 SV ) 6.4 199
15 Diaphragm plate 188x360x12 mm 10 Nos 64.00 5.5 18.2 146
16 End stiffener 50x352x12 mm 24 Nos 40.00 1.2 21.7 174
17 Pad plate 250x300x16 mm 8 Nos 75.00 4.4 8.8 71
18 Stiffener 80x130x10 mm 8 Nos 7.00 0.7 3.4 28
19 Support plate 20x2540x16 mm 1 No. 6.00 2.6 5.1 41
20 Seal support 65x2905x12 mm 2 Nos 36.00 5.9 --- ---
21 Support plate 20x3105x12 mm 2 Nos. 12.00 6.3 12.5 100
22 Sealing frame 65x2795x12 mm 1 No. 17.00 2.8 --- ---
23 Sealing frame 20x2755x12 mm 1 No. 5.00 2.8 5.5 44
24 Seal support 65x1965x12 mm 1 No. 12.00 2.0 --- ---
25 Seal support 65x375x12 mm 2 Nos 5.00 0.9 --- ---
26 Stopper 20x2540x12 mm 1 No. 5.00 2.5 5.1 41
27 Plate 50x70x12 mm 2 Nos 1.00 0.1 0.2 2
28 Bracket plate 400x570x16 mm 4 Nos 115.00 3.9 3.2 26
29 Bracket plate 180x785x6 mm 2 Nos 13.00 2.0 1.0 8
30 Stiffener 172x350x12 mm 4 Nos 23.00 2.0 5.5 44
31 Stiffener 56x250x12 mm 4 Nos 5.00 1.2 4.4 36
32 Counter weight ( CI blocks ) 4000.00 --- --- ---
33 GI Bolt/Nut/Washer 24 diax280 mm 60 No 72.00 --- --- ---
34 Plates for guide roller 4 sets 72.00 1.4 1.8 15
35 Guide roller 4 Nos 8.00 --- --- ---
Wheel assembly : --- ---
36 Wheels 484.00 --- --- ---
37 Bearings 76.00 --- --- ---
38 Bearing retainer plate 80.00 --- --- ---
39 Cover plate 8.00 --- --- ---
40 Spacer plates 16.00 --- --- ---
41 Stainless steel pin 132.00 --- --- ---
42 Keeper plate 8.00 0.1 --- ---
43 GI Bolt / Nut / Screw / Washer 2.00 --- --- ---
44 MS Bolt / Nut / Screw / Washer 4.00 --- --- ---
Seal assembly :
45 Flat bottom seal 2755 mm 1 No. --- --- --- ---
46 Music note side seal 2855 mm 2 Nos --- --- --- ---
47 Double flange top seal 2199 mm 1 No. --- --- --- ---
48 Corner seal 2 Nos --- --- --- ---
49 seal clamp 90x2545x20 mm 1 No. 36.00 0.1 --- ---
50 Seal clamp 45x1495x20 mm 2 Nos 21.00 0.1 --- ---
51 Seal clamp 45x1628x20 mm 2 Nos 23.00 0.1 --- ---

152
GATES AND HOISTS

52 Seal clamp 45x2545x20 mm 1 No. 18.00 --- --- ---


53 Seal clamp 45x2660x20 mm 1 No. 19.00 0.1 --- ---
54 SS Bolt / Nut / Washer 20 dia x 80 mm 10.00 --- --- ---
55 SS Bolt / Nut / Washer 20 dia x 100 mm 44.00 --- --- ---
Total : 9202.00 137.1 280.5 2745
kg Rm Rm Nos
ABSTRACT :
1. Structural steel : IS : 2062
Plates / Flats : 4370.00 kg
2. Cast steel components : IS : 1030
Wheels / Guide roller : 492.00 kg
3. Alluminium / Bronze alloy components : IS : 305
Bearings / Bushes : 76.00 kg
4. Alloy steel components : IS : 1570
Wheel axle / lifting pin : 132.00 kg
5. Rubber seals : IS : 11855
Bottom rubber seal ( uncladed ) : 2.76 Rm
Side rubber seal ( teflon claded ) : 5.71 Rm
Top rubber seal ( teflon claded ) 2.20 Rm
Corner seal 2 Nos
6. Bolt / Nut / Washer IS : 1363
SS Bolt / Nut / Washer : 54.00 kg
GI Bolt / Nut / Washer 80.00 kg
7. Other components :
CI counter weight : 4000.00 kg
8. Other details :
Length of cutting : 137.10 Rm
Length of welding : 280.50 Rm
Number of electrodes : 2745 Nos

14. Rope drum hoist for river / canal sluice service gate :
Details of materials / Gas cutting / Welding for rate analysis :
Note : 1. Data based on 25 t rope drum hoist drawings for river sluice service gate of Kodasalli dam.
2. Unless otherwise specified 6 mm fillet weld considered for computation of requirement of
welding electrodes.
3. Plate cutting considered for 2 sides assuming other 2 sides free face.
Sl No. DESCRIPTION OF MATERIALS Weight Gas cutting Weld length Number of
in kg length in m in m electrodes
Hoist frame :
1 ISMC 400 x 3900 mm 4 Nos 782.00 2.4 --- ---
2 ISMC 250 x 935 mm 3 Nos 80.00 1.2 --- ---
3 ISMC 250 x 1236 mm 2 Nos 76.00 0.8 --- ---
4 ISMC 200 x 1330 mm 8 Nos 237.00 2.8 --- ---
5 ISMC 200 x 440 mm 2 Nos 20.00 0.7 --- ---
6 ISMC 150 x 1330 mm 6 Nos 134.00 1.8 --- ---
7 Bracket plate 300x560x16 mm 4 Nos 84.00 2.4 4.8 39
8 Stiffener 95x160x10 mm 8 Nos 10.00 2.0 4.1 33
9 Stiffener 85x378x10 mm 24 Nos 61.00 11.1 26.3 211
10 Base plate 145x370x30 mm 2 Nos 25.00 1.0 1.1 9
11 Stiffener 120x399x10 mm 2 Nos 8.00 1.1 2.1 17
12 Base plate 110x430x10 mm 2 Nos 8.00 1.0 1.2 10
13 ISMC 400 x 110 mm 2 Nos 14.00 1.2 0.5 4
14 Base plate 336x340x10 mm 1 No. 9.00 0.7 0.5 4
15 Base plate 160x390x10 mm 1 No. 5.00 0.6 0.5 4
16 Base plate 210x300x10 mm 1 No. 5.00 0.5 0.5 4
17 Cleat ISA 50x50x6 x 150 mm 36 Nos 22.00 3.6 18.0 144

153
GATES AND HOISTS

18 Cleat ISA 65x65x6 x 180 mm 20 Nos 21.00 2.6 12.4 101


19 Cleat ISA 50x50x6 x 100 mm 24 Nos 11.00 2.4 9.6 77
20 Cleat ISA 50x50x6 x 121 mm 2 Nos 1.00 0.2 0.9 8
21 Cleat ISA 50x50x6 x 116 mm 2 Nos 1.00 0.2 0.9 8
22 Base plate 200x250x20 mm 8 Nos 63.00 3.6 --- ---
23 Bracket plate 300x500x12 mm 2 Nos 28.00 1.6 1.4 12
24 Stiffener 260 dia x 12 mm 2 Nos 13.00 1.6 1.6 13
25 Anchor bolt 20 dia x 350 mm 16 Nos 14.00 0.3 1.0 8
26 Nut / Washer 20 dia 16 Nos 1.00 --- --- ---
27 Anchor plate 60x60x12 mm 16 Nos 5.00 1.0 --- ---
28 Bolt/Nut/Washer dia 22 x 85 mm 4 Nos 2.00 --- --- ---
29 Bolt/Nut/Washer dia 10 x 65 mm 4 Nos 1.00 --- --- ---
30 Bolt/Nut/Washer dia 14 x 65 mm 4 Nos 1.00 --- --- ---
31 Bolt/Nut/Washer dia 16 x 65 mm 4 Nos 1.00 --- --- ---
32 Bolt/Nut/Washer dia 24 x 110 mm 4 Nos 3.00 --- --- ---
33 ISMC 150 x 935 mm 2 Nos 31.00 0.6 --- ---
34 ISMC 200 x 935 mm 1 No. 21.00 0.4 --- ---
35 Plate 80x2250x10 mm 2 Nos 28.00 0.2 9.3 75
36 Chequered plate 6 mm th 6 sqm 283.00 6.0 --- ---
Plummer blocks :
37 Plummer body 2 Nos 72.00 --- --- ---
38 Bronze bush 2 Nos 13.00 --- --- ---
39 Shims 2 Nos 2.00 --- --- ---
40 Bolt/Nut/Washer 4 Nos 1.00 --- --- ---
Shafts :
41 Drum shaft 110 dia x 1381 mm 2 Nos 206.00 --- --- ---
42 1st pinion shaft 70 dia x 650 mm 1 No. 20.00 --- --- ---
43 2nd pinion shaft 120 dia x 1350 mm 1 No. 120.00 --- --- ---
Drum assembly :
44 Drum 560 PCD 2 Nos 1420.00 --- --- ---
45 Bronze bush 140/110 diax140 mm 2 Nos 12.00 --- --- ---
46 Bronze bush 140/110 diax100 mm 2 Nos 10.00 --- --- ---
47 Spacers 240/112 x 10 mm 2 Nos 6.00 --- --- ---
48 Spacers 240/112 x 6 mm 2 Nos 4.00 --- --- ---
49 Clamping plate 100x150x32 mm 4 Nos 16.00 0.4 --- ---
50 Lock plate 50x210x12 mm 4 Nos 4.00 0.2 --- ---
51 Bolt/Nut/Washer 12 Nos 5.00 --- --- ---
Gears and pinions :
52 Drum gear 980 PCD 2 Nos 350.00 --- --- ---
53 Gear 800 PCD 1 No. 156.00 --- --- ---
54 1st reduction pinion 1 No. 19.00 --- --- ---
55 2nd reduction pinion 2 No. 60.00 --- --- ---
Pulleys and sheaves :
56 Pulley 672 PCD 2 Nos 180.00 --- --- ---
57 Pin 120 dia x 262 mm 2 Nos 46.00 --- --- ---
58 Bronze bush 145/120 dia x 160 mm 2 14.00 --- --- ---
59 Spacer 170/123 dia 2.00 --- --- ---
60 Lock plate 50x190x12 mm 4 Nos 4.00 0.2 --- ---
61 Pulley 350 PCD 1 No. 76.00 --- --- ---
62 Pin 130 dia x 258 mm 1 No. 27.00 --- --- ---
63 Bronze bush 1 No. 8.00 --- --- ---
64 Brass Washer 180/132x8 mm 2 Nos 2.00 --- --- ---
65 Keeper plate 50x190x12 mm 2 Nos 2.00 0.1 --- ---
Hoist drive :
66 Electric motor 5 hp 1 No. 50.00 --- --- ---
67 Worm reducer 1 No. 500.00 --- --- ---

154
GATES AND HOISTS

68 Flexible coupling 2 Nos 50.00 --- --- ---


69 Wire rope 28 dia 6x37 constn 120 m 500.00 --- --- ---
70 Manual operation assembly 1 No. 120.00 --- --- ---
71 Position indicator 1 No. 32.00 --- --- ---
72 EM brake 1 No. 25.00 --- --- ---
Total : 6243.00 56.5 96.7 781.0
kg Rm Rm Nos
ABSTRACT :
1. Structural steel : IS : 2062
Angle / Channel / Beam / Bars : 1451.00 kg
Plates / Flats : 392.00 kg
Chequered plate for platform covering : 283.00 kg
2. Cast steel components : IS : 1030
Rope drums 2 Nos : 1420.00 kg
Gears 3 Nos : 506.00 kg
Pinions : 79.00 kg
Pulleys 3 Nos / Couplings 2 Nos : 306.00 kg
Plummer blocks : 72.00 kg
3. Alloy steel components : IS : 1570
Shafts : 346.00 kg
Pins : 73.00 kg
4. Alluminium / Bronze alloy components : IS : 305
Bearings / Bushes : 57.00 kg
5. Wire rope : IS : 2266
28 mm dia 6/37 construction rope : 120 Rm
6. Bolts / Nuts / Washers : IS : 1363
Bolts / Nuts / Washers ( various size ) : 31.00 kg
7. Other components :
Electric motor 5 hp Standard : 1 No.
Worm reducer Standard : 1 No
Electro-megnatic brake Standard : 1 No
Manual operation assembly : 1 No.
Position indicator : 1 No.
8. Other details :
Length of cutting : 56.50 Rm
Length of welding : 96.70 Rm
Number of electrodes : 781 Nos

15. Embedded parts without groove lining for river / canal sluice emergency gate :
Details of materials / Gas cutting / Welding for rate analysis :
Note : 1. Data based on emedded parts drawings for river sluice service gate of Upper Tunga dam.
2. Unless otherwise specified 6 mm fillet weld considered for computation of requirement of
welding electrodes.
3. Plate cutting considered for 2 sides assuming other 2 sides free face.
Sl No. DESCRIPTION OF MATERIALS Weight Gas cutting Weld length Number of
in kg length in m in m electrodes
First stage anchors :
1 Anchor plate 100x210x10 mm 28 Nos 46.00 8.7 5.6 45
2 Anchor bar 12 dia x 350 mm 56 Nos 18.00 0.7 1.0 17
3 Anchor plate 100x180x10 mm 40 Nos 56.00 11.1 8.0 64
4 Anchor bar 12 dia x 350 mm 48 Nos 15.00 0.6 1.8 15
5 Anchor plate 80x515x8 mm 10 Nos 26.00 6.0 3.6 29
6 Anchor bar 12 dia x 350 mm 36 Nos 11.00 0.5 1.4 11
7 Anchor plate 80x150x10 mm 20 Nos 19.00 1.6 --- ---
8 Anchor bar 12 dia x 350 mm 40 Nos 13.00 0.5 1.5 12
9 Anchor plate 80x150x10 mm 24 Nos 23.00 1.9 --- ---

155
GATES AND HOISTS

10 Anchor bar 12 dia x 350 mm 48 Nos 15.00 0.6 1.8 14


11 Anchor plate 100x210x10 mm 20 Nos 33.00 2.0 --- ---
12 Anchor bar 12 dia x 350 mm 40 Nos 13.00 0.5 1.5 12
Embedded parts :
13 Anchor bolt 16 dia x 285 mm 48 Nos 22.00 0.8 2.4 19
14 Anchor bolt 16 dia x 200 mm 8 Nos 2.00 0.1 0.4 3
15 Anchor bolt 16 dia x 185 mm 36 Nos 11.00 0.5 1.8 14
16 Anchor bolt 16 dia x 500 mm 24 Nos 18.00 0.4 1.2 10
17 Alignment plate 100x210x10 mm 28 Nos 46.00 2.8 --- ---
18 Alignment plate 100x180x10 mm 24 Nos 34.00 2.4 --- ---
19 Alignment plate 80x515x8 mm 10 Nos 26.00 0.8 --- ---
20 Split anchor plate 60x400x6 mm 20 Nos 23.00 10.4 3.6 29
21 Nut / Washer for anchor bolts 200 Nos 10.00 --- --- ---
22 SS track 115x6750x10 mm 2 Nos 122.00 13.7 27.5 220
23 Track base 130x7100x12 mm 2 Nos 174.00 14.5 28.4 227
24 Track base ISMB 200x7100 mm 2 Nos 360.00 0.6 --- ---
25 Sill beam ISMB 200x2300 mm 1 No. 58.00 0.3 --- ---
26 SS seal seat 115x2300x6 mm 1 No. 12.00 2.4 ( F4 ) 4.6 23
27 SS seal seat 80x3035x5 mm 2 Nos. 19.00 6.3 ( F4 ) 12.2 61
28 Seal base ISA100x100x8 x3020 mm 2 No 73.00 0.4 --- ---
29 SS seal seat 1680x990x5 mm 1 No. 66.00 1.8 ( F4 ) 5.4 27
30 Seal base 1700x1000x20 mm 1 Nos 267.00 2.7 --- ---
31 Guide 120x2200x20 mm 6 Nos 246.00 14.1 --- ---
32 Guide 120x2400x20 mm 4 Nos 180.00 10.1 --- ---
33 Stiffener 130x1700x20 mm 1 No. 35.00 2.0 3.4 27
34 Stiffener 120x390x8 mm 8 Nos 24.00 4.1 10.1 81
35 Stiffener 120x980x10 mm 5 Nos 46.00 5.2 11.0 88
36 Cleat ISA75x75x8 x 80 mm 24 Nos 17.00 3.6 4.8 38
37 Spacer pipe/ washer 20 dia x 20 mm 1.00 --- --- ---
Total : 2180.00 134.7 143.0 1086
kg Rm Rm Nos
ABSTRACT :
1. Structural steel : IS : 2062
Angle / Channel / Beam / Bars : 593.00 kg
Plates / Flats : 1304.00 kg
2. Alloy steel components : IS : 1570
Stainless steel plates : 219.00 kg
3. Bolt / Nut / Washer : IS : 1363
MS Bolt / Nut / Washer : 64.00 kg
4. Other details :
Length of cutting : 135 Rm
Length of welding : 143 Rm
Number of electrodes ( str steel ) : 755 Nos
Number of electrodes ( stainless steel ) : 331 Nos

16. Embedded parts with groove lining for river / canal sluice emergency gate :
Details of materials / Gas cutting / Welding for rate analysis :
Note : 1. Data based on embedded parts drawings for river sluice emergency gate of Kodasalli dam.
2. Unless otherwise specified 6 mm fillet weld considered for computation of requirement of
welding electrodes.
3. Plate cutting considered for 2 sides assuming other 2 sides free face.
Sl No. DESCRIPTION OF MATERIALS Weight Gas cutting Weld length Number of
in kg length in m in m electrodes
First stage anchors :
1 Plate 80x210x10 mm 234 Nos 309.00 18.7 --- ---
2 Anchor bar 12 dia x 350 mm 468 Nos 145.00 5.6 17.6 141

156
GATES AND HOISTS

3 Plate 80x80x10 mm 58 Nos 29.00 4.7 --- ---


4 Anchor bar 12 dia x 350 mm 58 Nos 18.00 0.7 2.2 18
Embedded parts :
5 SS seal seat 100x2800x6 mm 1 No. 13.00 0.1 ( F4 ) 5.8 29
6 Liner plate 666x3550x20 mm 1 No. 371.00 4.2 --- ---
7 Stiffener 220x3520x10 mm 1 Nos 61.00 3.8 7.0 56
8 Stiffener 120x3520x10 mm 1 Nos 33.00 3.7 7.0 56
9 Stiffener 155x420x8 mm 3 Nos 12.00 1.7 4.4 36
10 Cleat ISA 75x75x8 x 80 mm 20 Nos 14.00 3.0 3.8 31
11 SS seal seat 180x2720x6 mm 1 No. 23.00 2.9 ( F4 ) 5.8 29
12 Liner plate 814x3640x20 mm 1 No. 465.00 4.5 --- ---
13 Liner plate 484x2600x20 mm 1 No. 198.00 3.1 5.2 42
14 Stiffener 120x814x12 mm 7 Nos 64.00 6.5 17.8 143
15 SS track plate 150x3000x20 mm 2 Nos 141.00 6.3 ( F8 ) 12.6 189
16 Track base 200x3000x40 mm 2 Nos 377.00 6.4 --- ---
17 Track web pl 320x3000x20 mm 2 Nos 301.00 6.6 24.0 192
18 Anchor plate 80x200x10 mm 98 Nos 123.00 7.8 15.7 126
19 Track ISMB 150 x 4200 mm 12 Nos 751.00 3.6 6.0 48
20 Track ISMB 150 x 1200 mm 2 Nos 36.00 0.6 1.0 8
21 Guide 110x2000x16 mm 30 Nos 829.00 63.3 126.6 1013
22 Guide anchor pl 80x200x12 mm 120 Nos 181.00 9.6 --- ---
23 Anchor bolt 16 dia x 185 mm 436 Nos 127.00 7.0 21.9 176
24 Anchor bolt 16 dia x 300 mm 12 Nos 6.00 0.2 0.6 5
25 Anchor bolt 16 dia x 380 mm 8 Nos 5.00 0.1 0.4 4
26 Nut / Washer for 16 dia bolts 912 Nos 38.00 --- --- ---
27 Anchor plate 80x400x8 mm 7 Nos 14.00 0.6 1.6 13
28 Stiffener 120x2600x10 mm 2 Nos 49.00 5.5 10.4 84
29 Cover plate 270x290x10 mm 4 Nos 25.00 2.3 --- ---
30 Back strip 40x2580x6 mm 2 Nos 10.00 0.1 2.0 16
31 Bolt/Nut/Washer 20 diax65 mm 24 Nos 8.00 --- --- ---
32 Track base pl 220x4767x40 mm 2 Nos 659.00 10.0 --- ---
33 Track web pl 320x4767x20 mm 2 Nos 479.00 10.2 19.0 152
34 SS track plate 170x4217x20 mm 2 Nos 225.00 8.8 ( F8 ) 17.6 264
35 Side plate 210x3917x20 mm 2 Nos 258.00 8.3 16.5 132
36 Side plate 115x3026x20 mm 2 Nos 109.00 6.3 12.6 101
37 Stiffener 260x295x8 mm 8 Nos 39.00 4.5 8.9 72
38 Stiffener 210x260x8 mm 4 Nos 14.00 1.9 3.8 31
39 Stiffener 210x260x10 mm 2 Nos 9.00 1.0 1.9 16
40 Anchor plate 80x200x10 mm 16 Nos 20.00 1.3 2.6 21
41 Groove lining 560x3915x20 mm 2 Nos 688.00 9.0 --- ---
42 Guide 40x3878x16 mm 2 Nos 39.00 0.1 7.8 63
43 Stiffener 100x3915x10 mm 2 Nos 61.00 0.2 16.0 128
44 Stiffener 100x3841x10 mm 2 Nos 60.00 0.2 15.8 127
45 Stiffener 120x3878x10 mm 2 Nos 73.00 8.0 16.0 128
46 Stiffener 110x265x8 mm 16 Nos 29.00 6.0 12.0 96
47 Cleat ISA 75x75x6 x 80 mm 40 Nos 22.00 6.0 8.0 64
48 SS seal seat 100x3050x6 mm 2 Nos 29.00 0.2 ( F4 ) 12.6 63
49 Liner plate 570x3026x20 mm 2 Nos 542.00 7.2 --- ---
50 Stiffener 120x3024x10 mm 2 Nos 57.00 6.3 12.1 97
51 Stiffener 330x220x10 mm 6 Nos 34.00 4.5 6.6 53
52 Stiffener 760x350x10 mm 3 Nos 69.00 4.0 8.2 66
53 Stiffener 80x975x10 mm 8 Nos 49.00 0.7 15.6 125
54 Stiffener 80x988x10 mm 4 Nos 25.00 0.3 7.9 64
55 B/W liner 800x2780x20 mm 1 No. 349.00 3.6 5.5 44
56 B/W liner 484x2780x20 mm 1 No. 211.00 3.3 5.6 45
57 Stiffener 100x2740x10 mm 2 No. 43.00 0.2 11.0 88

157
GATES AND HOISTS

58 Stiffener 100x1245x10 mm 2 Nos 20.00 0.2 5.8 47


59 Anchor bolt 16 dia x 185 mm 32 Nos 10.00 0.5 1.6 13
60 Anchor bolt 16 dia x 355 mm 28 Nos 16.00 0.5 1.4 12
61 Anchor bolt 16 dia x 450 mm 12 Nos 9.00 0.2 0.6 5
62 Nut / Washer for 16 dia bolt 144 Nos 7.00 --- --- ---
63 Back strip 40x3027x6 mm 6 Nos 34.00 0.3 2.0 16
64 Cleat ISA 75x75x6 x 80 mm 12 Nos 6.00 1.8 1.9 16
65 Bolt/Nut/Washer 20 diax65 mm 28 Nos 8.00 --- --- ---
66 Stiffener 110x195x10 mm 6 Nos 10.00 1.8 3.7 30
Total : 9088.00 300.6 560.0 4634.0
kg Rm Rm Nos
ABSTRACT :
1. Structural steel : IS : 2062
Angle / Channel / Beam / Bars : 992.00 kg
Plates / Flats : 7431.00 kg
2. Alloy steel components : IS : 1570
Stainless steel plates : 431.00 kg
3. Bolt / Nut / Washer : IS : 1363
MS Bolt / Nut / Washer : 234.00 kg
4. Other details :
Length of cutting : 301 Rm
Length of welding : 560 Rm
Number of electrodes ( str steel ) : 4060 Nos
Number of electrodes ( stainless steel ) : 574 Nos

17. River / canal sluice emergency gate :


Details of materials / Gas cutting / Welding for rate analysis :
Note : 1. Data based river sluice emergency gate drawings for 2m x 3 m sluice vent of Kodasalli dam.
2. Unless otherwise specified 6 mm fillet weld considered for computation of requirement of
welding electrodes.
3. Plate cutting considered for 2 sides assuming other 2 sides free face.
Sl No. DESCRIPTION OF MATERIALS Weight Gas cutting Weld length Number of
in kg length in m in m electrodes
Gate leaf :
1 Skin plate 3220x3372x18 mm 1 No. 1534.00 6.6 --- ---
2 Ver stiffener 140x688x10 mm 28 Nos 212.00 23.2 54.2 434
3 Web plate 350x688x10 mm 6 Nos 114.00 6.2 16.7 134
4 Web plate 350x688x10 mm 2 Nos 38.00 2.0 5.8 47
5 Girder web 350x2788x12 mm 4 Nos 368.00 12.5 50.2 402
6 Girder web 390x2788x12 mm 1 No 102.00 3.2 7.1 57
7 Flange plate 320x2788x20 mm 4 Nos 560.00 12.5 ( SV ) 2.6 130
8 Flange plate 250x2788x20 mm 1 No. 109.00 3.0 ( SV ) 3.3 165
9 End plate 370x3251x12 mm 4 Nos 453.00 14.5 26.0 208
10 Flange plate 150x380x12 mm 6 Nos 32.00 3.2 6.4 52
11 Flange plate 150x152x12 mm 2 Nos 4.00 0.6 1.2 10
12 Flange plate 80x380x18 mm 6 Nos 26.00 0.5 ( SV ) 3.2 100
13 Flange plate 80x152x18 mm 2 Nos 4.00 0.2 1.0 8
14 End ver plate 80x3170x18 mm 2 Nos 72.00 0.2 6.4 52
15 Diaphragm plate 188x360x12 mm 10 Nos 64.00 5.5 18.2 146
16 End stiffener 50x352x12 mm 16 Nos 27.00 0.8 14.5 116
17 Pad plate 250x300x16 mm 8 Nos 75.00 4.4 8.8 71
18 Stiffener 80x130x10 mm 8 Nos 7.00 0.7 3.4 28
19 Support plate 20x2540x16 mm 1 No. 6.00 2.6 5.1 41
20 Seal support 65x2905x12 mm 2 Nos 36.00 5.9 --- ---
21 Support plate 20x3105x12 mm 2 Nos. 12.00 6.3 12.5 100
22 Sealing frame 65x2795x12 mm 1 No. 17.00 2.8 --- ---

158
GATES AND HOISTS

23 Sealing frame 20x2755x12 mm 1 No. 5.00 2.8 5.5 44


24 Seal support 65x1965x12 mm 1 No. 12.00 2.0 --- ---
25 Seal support 65x375x12 mm 2 Nos 5.00 0.9 --- ---
26 Stopper 20x2540x12 mm 1 No. 5.00 2.6 5.1 41
27 Plate 50x70x12 mm 2 Nos 1.00 0.1 0.3 3
28 Bracket plate 300x500x16 mm 4 Nos 75.00 3.2 2.4 20
29 GI Bolt/Nut/Washer 24 diax280 mm 118 142.00 --- --- ---
30 Stiffener 148x300x12 mm 4 Nos 17.00 1.8 4.9 40
31 Stiffener 90x250x12 mm 4 Nos 8.00 1.4 4.7 38
32 Counter weight ( CI blocks ) 4000.00 --- --- ---
33 Pin 80 dia x 150 mm 2 Nos 12.00 --- --- ---
34 Plates for guide roller 4 sets 72.00 1.4 1.8 15
35 Guide roller 4 Nos 8.00 --- --- ---
Wheel assembly :
36 Wheels 484.00 --- --- ---
37 Bearings 76.00 --- --- ---
38 Bearing retainer plate 80.00 --- --- ---
39 Cover plate 8.00 --- --- ---
40 Spacer plates 16.00 --- --- ---
41 Stainless steel pin 132.00 --- --- ---
42 Keeper plate 8.00 0.1 --- ---
43 GI Bolt / Nut / Screw / Washer 2.00 --- --- ---
44 MS Bolt / Nut / Screw / Washer 4.00 --- --- ---
Seal assembly :
45 Flat bottom seal 2755 mm 1 No. --- --- --- ---
46 Music note side seal 2855 mm 2 Nos --- --- --- ---
47 Double flange top seal 2199 mm 1 No. --- --- --- ---
48 Corner seal 2 Nos --- --- --- ---
49 seal clamp 90x2545x20 mm 1 No. 36.00 0.1 --- ---
50 Seal clamp 45x1495x20 mm 2 Nos 21.00 0.1 --- ---
51 Seal clamp 45x1628x20 mm 2 Nos 23.00 0.1 --- ---
52 Seal clamp 45x2545x20 mm 1 No. 18.00 --- --- ---
53 Seal clamp 45x2660x20 mm 1 No. 19.00 0.1 --- ---
54 SS Bolt / Nut / Washer 20 dia x 80 mm 10.00 --- --- ---
55 SS Bolt / Nut / Washer 20 dia x 100 mm 44.00 --- --- ---
Total : 9215.00 134.1 271.3 2502.0
kg Rm Rm Nos
ABSTRACT :
1. Structural steel : IS : 2062
Plates / Flats : 4301.00 kg
2. Cast steel components : IS : 1030
Wheels / Guide roller : 492.00 kg
3. Alluminium / Bronze alloy components : IS : 305
Bearings / Bushes : 76.00 kg
4. Alloy steel components : IS : 1570
Wheel axle / lifting pin : 144.00 kg

159
GATES AND HOISTS

5 Rubber seals : IS : 11855


Bottom rubber seal ( uncladed ) : 2.76 Rm
Side rubber seal ( teflon claded ) : 5.71 Rm
Top rubber seal ( teflon claded ) 2.20 Rm
Corner seal 2 Nos
6. Bolt / Nut / Washer IS : 1363
SS Bolt / Nut / Washer : 54.00 kg
GI Bolt / Nut / Washer 144.00 kg
MS Bolt / Nut / Washer : 4.00 kg
7. Other components :
CI counter weight : 4000.00 kg
8. Other details :
Length of cutting : 134.10 Rm
Length of welding : 271.30 Rm
Number of electrodes : 2502 Nos

18. Lifting beam for river / canal sluice emergency gate :


Details of materials / Gas cutting / Welding for rate analysis :
Note : 1. Data based on lifting beam drawings for river sluice emergency gate of Kodasalli dam.
2. Unless otherwise specified 6 mm fillet weld considered for computation of requirement of
welding electrodes.
3. Plate cutting considered for 2 sides assuming other 2 sides free face.
Sl No. DESCRIPTION OF MATERIALS Weight Gas cutting Weld length Number of
in kg length in m in m electrodes
1 ISMC 300 x 3186 mm 2 Nos 228.00 1.2 3.8 31
2 Plate 250x450x20 mm 4 Nos 71.00 2.8 4.0 32
3 Plate 190x300x10 mm 7 Nos 31.00 3.5 8.4 68
4 Stiffener 75x278x10 mm 14 Nos 23.00 5.0 12.3 99
5 Stiffener 80x100x10 mm 8 Nos 5.00 0.8 2.9 24
6 Stiffener 80x330x10 mm 10 Nos 21.00 0.8 4.4 36
7 Stiffener 140x330x10 mm 2 Nos 7.00 1.0 1.2 10
8 Pipe 100 dia x 540 mm 2 Nos 11.00 --- 0.6 5
9 Plate 400x720x12 mm 2 Nos 54.00 2.3 --- ---
10 Plate 200x390x10 mm 4 Nos 24.00 2.0 4.7 38
11 Plate 50x190x20 mm 2 Nos 3.00 0.3 0.6 5
12 Hook 2 Nos 130.00 --- --- ---
13 Plate 80x150x20 mm 2 Nos 4.00 0.2 0.3 3
14 Bronze bush 110/90/70 dia x 100 mm 2 4.00 --- --- ---
15 SS pin 70 dia x 250 mm 2 Nos 15.00 --- --- ---
16 Plate 120x700x10 mm 4 Nos 26.00 6.0 --- ---
17 Plate 104x145x20 mm 2 Nos 5.00 0.5 0.3 3
18 Plate 120x120x25 mm 8 Nos 23.00 1.9 --- ---
19 Plate 180x766x20 mm 4 Nos 87.00 7.5 --- ---
20 Plate 331x462x25 mm 2 Nos 60.00 2.0 --- ---
21 SS pin 85 dia x 65 mm 4 Nos 11.00 --- --- ---
22 SS pin 110 dia x 231 mm 1 No. 17.00 --- --- ---
23 SS pin 90 dia x 280 mm 2 Nos 28.00 --- --- ---
24 Plate 150x190x12 mm 4 Nos 11.00 1.4 --- ---
25 Plate 83x150x12 mm 8 Nos 9.00 1.9 2.4 20
26 Plate 26x150x16 mm 4 Nos 2.00 0.7 ( SV ) 1.2 28
27 Plate 40x73x8 mm 4 Nos 1.00 0.5 0.9 8
28 Shims 4.00 --- --- ---
29 Keeper plate 40x140x12 mm 1 No. 1.00 --- --- ---
30 Keeper plate 40x140x10 mm 4 Nos 2.00 0.2 --- ---
31 Plate 73x80x8 mm 4 Nos 2.00 0.6 1.2 10
32 Bolt/Nut/Washer 20 dia x 150 mm 2 Nos 1.00 --- --- ---

160
GATES AND HOISTS

33 Bolt/Nut/Washer 16 dia x 35 mm 16 Nos 1.00 --- --- ---


Total : 922.00 43.1 49.2 420
kg Rm Rm Nos
ABSTRACT :
1. Structural steel : IS : 2062
Angle / Channel / Beam / Bars : 228.00 kg
Plates / Flats : 476.00 kg
2. Forged steel components IS : 2004
Lifting hooks : 130.00 kg
3. Alluminium / Bronze alloy components : IS : 305
Bearings / Bushes : 4.00 kg
4. Alloy steel components : IS : 1570
Stainless steel pins : 71.00 kg
5. Bolt / Nut / Washer IS : 1363
Bolt / Nut / Washer : 2.00 kg
6. Other components :
Pipe 100 mm dia : 1.08 Rm
7. Other details :
Length of cutting : 43.10 Rm
Length of welding : 49.20 Rm
Number of electrodes : 420 Nos

19. Embedded parts for Barrage gates :


Details of materials / Gas cutting / Welding for rate analysis :
Note : 1. Data based on embedded parts drawings for vertical lift roller gate of Hipparagi barrage.
2. Unless otherwise specified 6 mm fillet weld considered for computation of requirement of
welding electrodes.
3. Plate cutting considered for 2 sides assuming other 2 sides free face.
Sl No. DESCRIPTION OF MATERIALS Weight Gas cutting Weld length Number of
in kg length in m in m electrodes
1 SS track plate 130x8100x20 mm 2 Nos. 331.00 16.5 33.0 396
2 SS track plate 130x7090x20 mm 2 Nos. 289.00 14.5 29.4 352
3 Track base 220x8500x25 mm 2 Nos. 734.00 17.5 --- ---
4 Track base 220x7190x25 mm 2 Nos. 621.00 15.0 --- ---
5 Track web 360x8500x16 mm 2 Nos. 769.00 17.8 34.0 272
6 Track web 360x7190x16 mm 2 Nos. 650.00 15.1 28.8 230
7 Sill beam ISMB 200 x 3750 mm 2 Nos 191.00 0.8 --- ---
8 Sill beam ISMB 200 x 3600 mm 2 Nos 183.00 0.8 --- ---
9 SS seal seat 80x3750x6.5 mm 2 Nos 31.00 7.7 15.2 91
10 SS seal seat 80x3600x6.5 mm 2 Nos 29.00 7.4 14.6 88
11 SS seal seat 20x140x6.5 mm 2 Nos 1.00 0.3 0.4 2
12 SS seal seat 80x4200x6.5 mm 2 Nos 34.00 8.6 17.0 102
13 SS seal seat 80x4600x6.5 mm 2 Nos 38.00 9.4 18.6 112
14 Seal base ISA100x100x8x4200 mm 2 No 102.00 0.2 --- ---
15 Seal base ISA100x100x8x4630 mm 2 No 112.00 0.2 --- ---
16 Seal base 75x515x8 mm 30 Nos. 73.00 17.7 8.3 66
17 Guide 110x3000x20 mm 8 Nos. 414.00 24.9 --- ---
18 Guide 110x3690x20 mm 2 Nos. 127.00 7.6 --- ---
19 Anchor pl 100x220x10 mm 76 Nos. 131.00 7.6 15.2 122
20 Anchor pl 100x200x12 mm 52 Nos. 98.00 5.0 10.4 83
21 Anchor bolt 16 dia x 200 mm 52 Nos. 16.00 0.8 2.6 21
22 Anchor bolt 16 dia x 290 mm 74 Nos. 34.00 1.2 3.7 30
23 Anchor bolt 16 dia x 185 mm 60 Nos. 18.00 1.0 3.0 24
24 Anchor bolt 16 dia x 295 mm 104 Nos. 48.00 1.7 5.2 42
25 Nuts & Washer 16 dia 580 Nos 33.00 --- --- ---
26 Stiffener 90x210x8 mm 20 Nos. 24.00 6.0 12.0 96

161
GATES AND HOISTS

27 Splice pl 210x320x12 mm 4 Nos. 22.00 2.2 --- ---


28 Splice pl 150x260x12 mm 6 Nos. 22.00 2.5 --- ---
29 Bolt/Nut/Washer 16 dia x 60 mm 36 Nos 8.00 --- --- ---
30 Bolt/Nut/Washer 20 dia x 70 mm 24 Nos 10.00 --- --- ---
Total : 5193.00 210.0 251.4 2129
kg Rm Rm Nos

ABSTRACT :
1. Structural steel : IS : 2062
Angles / Beams / Channels / Bars : 588.00 kg
Structural steel Plates / Flats : 3685.00 kg
2. Alloy steel components : IS : 1570
Stainless steel plates / flats for track : 620.00 kg
Stainless steel plates / flats for seal seat 133.00 kg
3. Bolt / Nut / Washer : IS : 1363
MS Bolts / Nuts / Washers : 167.00 kg
4. Other details :
Length of cutting : 210.00 Rm
Length of welding : 251.40 Rm
Number of electrodes ( str steel ) : 6486 Nos
Number of electrodes ( SS for wheel track ) 748 Nos
Number of electrodes ( SS for seal seat ) 395 Nos

20. Vertical lift roller gate for barrage


Details of materials / Gas cutting / Welding for rate analysis :
Note : 1. Data based on vertical lift roller gate drawings of Hipparagi barrage.
2. Unless otherwise specified 6 mm fillet weld considered for computation of requirement of
welding electrodes.
3. Plate cutting considered for 2 sides assuming other 2 sides free face.
Sl No. DESCRIPTION OF MATERIALS Weight Gas cutting Weld length Number of
in kg length in m in m electrodes
Gate leaf bottom unit :
1 Skin plate 2420x14700x16 mm 1 No. 4468.00 17.4 24.2 194
2 Stiffener ISA100x75x8x295 mm 35 Nos. 108.00 6.1 32.9 264
3 Stiffener ISA100x75x8x1730 mm 35 Nos. 634.00 6.1 145.6 1165
4 Stiffener ISA100x75x8x265 mm 33 Nos. 92.00 5.8 24.0 192
5 Web plate 1320x12820x10 mm 1 No. 1223.00 14.2 52.6 421
6 Web plate 1335x12820x10 mm 1 No. 1237.00 14.3 52.7 422
7 Web plate 650x718x10 mm 4 No. 293.00 9.0 20.6 165
8 Flange 300x8820x32 mm 2 Nos. 1329.00 18.5 --- ---
9 Flange 300x2852x32 mm 2 Nos. 430.00 6.3 1.2 18
10 Flange 300x2584x32 mm 2 Nos. 389.00 6.2 1.2 18
11 Flange 268x300x32 mm 2 Nos. 40.00 1.1 0.6 9
12 Flange 250x8000x12 mm 1 Nos. 188.00 8.5 16.5 132
13 Flange 270x8000x12 mm 1 Nos. 203.00 8.6 16.6 133
14 End girder 532x2410x12 mm 4 Nos. 483.00 11.8 19.3 155
15 Diaphragm 140x532x20 mm 6 Nos. 70.00 4.0 16.1 193
16 Flange 60x2320x16 mm 2 Nos. 35.00 5.6 9.3 75
17 Flange 60x235x16 mm 2 Nos. 4.00 0.6 1.2 10
18 Flange 60x1255x16 mm 2 Nos. 19.00 2.7 2.8 23
19 Flange 60x220x16 mm 2 Nos. 3.00 2.5 1.0 8
20 Pad plate 230x230x16 mm 8 Nos. 53.00 6.7 7.4 60
21 Stiffener 365x1210x10 mm 2 Nos. 69.00 3.2 7.8 63
22 Stiffener 150x980x10 mm 2 Nos. 23.00 2.3 5.1 41
23 Stiffener 150x1225x10 mm 2 Nos. 29.00 2.8 6.1 49
24 Stiffener 100x1320x10 mm 18 Nos. 186.00 1.8 54.7 438

162
GATES AND HOISTS

25 Gusset pl 210x250x10 mm 3 Nos. 12.00 1.5 2.8 23


26 Bracing ISA90x90x8x1520 mm 3 Nos 49.00 0.6 2.3 19
27 Bracing ISA90x90x8x1904 mm 1 Nos 21.00 0.2 0.7 6
28 Bracing ISA90x90x8x1830 mm 2 Nos 40.00 0.4 1.4 11
29 Seal guard 20x2345x12 mm 2 Nos. 9.00 --- 9.4 75
30 Seal guard 20x13770x20 mm 1 No. 43.00 --- 27.5 220
31 Seal base 65x2345x10 mm 2 Nos. 24.00 4.8 9.4 75
32 Stiffener 500x1220x10 mm 4 Nos. 191.00 6.9 14.6 117
33 Stiffener 150x200x10 mm 6 Nos. 14.00 2.1 3.6 29
34 Stiffener 150x1090x10 mm 1 Nos. 13.00 1.2 2.5 20
35 Stiffener 50x506x10 mm 6 Nos. 12.00 0.3 7.2 58
36 Splice pl 120x6879x8 mm 4 Nos. 207.00 28.0 --- ---
Gate leaf top unit : ---
37 Skin plate 3203x3810x10 mm 2 Nos. 1915.00 14.0 --- ---
38 Skin plate 2435x8295x10 mm 1 No. 1586.00 10.7 13.2 106
39 Skin plate 3705x8295x10 mm 1 No. 2412.00 12.0 7.4 59
40 Skin plate 2330x3203x10 mm 2 Nos. 1171.00 11.1 6.4 51
41 Stiffener ISA 75x75x8x1990 mm 35 Nos. 731.00 6.1 163.8 1310
42 Stiffener ISA 75x75x8x2590 mm 33 Nos. 893.00 5.8 194.0 1552
43 Stiffener ISA 75x75x8x1095 mm 35 Nos. 402.00 6.1 88.9 711
44 Stiffener 100x1130x10 mm 24 Nos. 213.00 2.4 63.8 511
45 Stiffener 100x970x10 mm 5 Nos. 38.00 0.5 11.7 94
46 Stiffener 150x995x10 mm 2 Nos. 23.00 2.3 5.2 42
47 Stiffener 150x833x10 mm 8 Nos. 78.00 7.9 18.1 145
48 Stiffener 150x755x10 mm 1 No. 9.00 0.9 2.1 17
49 Stiffener 100x880x10 mm 13 Nos. 90.00 1.3 28.0 224
50 Diaphragm 1062/848x2590x8 mm 2 Nos. 310.00 7.4 28.4 227
51 Web plate 1150x8295x10 mm 2 Nos. 1498.00 9.5 8.5 68
52 Web plate 1150/566x2981x10 mm 4 Nos. 663.00 14.2 28.4 227
53 Web plate 900x8295x10 mm 1 No. 586.00 9.2 18.4 147
54 Web plate 900/512x2981x10 mm 2 Nos. 330.00 7.0 14.0 112
55 Flange pl 300x8820x32 mm 2 Nos. 1329.00 18.3 36.5 548
56 Flange pl 300x2803x32 mm 4 Nos. 845.00 12.4 24.8 372
57 Flange pl 250x8820x20 mm 1 Nos. 346.00 9.5 18.6 223
58 Flange pl 250x2750x20 mm 2 Nos. 216.00 6.0 13.0 156
59 Flange pl 270x8000x12 mm 2 Nos. 406.00 16.5 34.2 274
60 Flange pl 150x2336x12 mm 2 Nos. 66.00 5.0 10.5 84
61 Stiffener 100x882x10 mm 4 Nos. 28.00 3.9 8.6 69
62 End girder 532x6140x12 mm 4 Nos. 1231.00 26.7 --- ---
63 Diaphragm 140x532x10 mm 10 Nos. 58.00 6.7 26.7 214
64 Pad plate 230x230x16 mm 8 Nos. 53.00 5.7 7.4 59
65 Seal base 65x6140x10 mm 2 Nos. 63.00 12.4 24.8 198
66 Seal base 20x6140x12 mm 2 Nos. 23.00 12.3 24.6 197
67 Cover plate 120x8175x8 mm 1 No. 62.00 8.3 16.4 131
68 Cover plate 120x6040x8 mm 2 Nos. 91.00 13.4 24.6 197
69 Cover plate 120x310x8 mm 2 No. 5.00 0.9 1.8 15
70 Cover plate 120x1960x8 mm 2 No. 30.00 4.2 8.4 67
71 Cover plate 120x2560x8 mm 2 No. 39.00 5.4 10.7 86
72 Cover plate 120x1090x8 mm 2 No. 16.00 2.5 5.0 40
73 Splice pl 120x1100x8 mm 8 Nos. 66.00 9.8 19.5 156
74 Splice pl 120x850x8 mm 8 Nos. 51.00 7.8 15.5 124
75 Splice pl 120x1022x10 mm 2 Nos 19.00 2.3 4.6 37
76 Stiffener 425x1062x10 mm 2 Nos. 71.00 3.0 5.9 47
77 Stiffener 120x8145x12 mm 1 No. 92.00 8.5 16.5 132
78 Flange plate 60x6140x16 mm 2 Nos. 93.00 12.4 24.6 197
79 Flange plate 60x985x16 mm 2 Nos. 15.00 2.1 4.0 32

163
GATES AND HOISTS

80 Flange plate 60x2325x16 mm 2 Nos. 35.00 4.8 9.3 75


81 Flange plate 60x1700x16 mm 2 Nos. 26.00 3.5 6.8 55
82 Flange plate 60x280x16 mm 2 Nos. 4.00 0.7 1.4 11
83 Stiffener 50x506x10 mm 20 Nos. 40.00 11.1 24.2 194
84 Bracing ISA90x90x8x1960 mm 3 Nos. 64.00 0.6 2.0 16
85 Bracing ISA90x90x8x2047 mm 1 Nos. 22.00 0.2 0.7 6
86 Bracing ISA90x90x8x2572 mm 2 Nos. 55.00 0.4 1.4 11
87 Stiffener ISA100x75x8x325 mm 35 Nos. 119.00 6.1 9.6 77
88 Gusset pl 125x265x10 mm 1 No. 3.00 0.4 0.8 7
89 Gusset pl 125x210x10 mm 1 No. 2.00 0.3 0.7 6
90 Gusset pl 135x250x10 mm 3 Nos. 8.00 1.2 2.3 19
91 Gusset pl 140x200x10 mm 3 No. 7.00 1.0 2.0 16
92 Gusset pl 130x270x12 mm 2 No. 7.00 0.8 1.6 13
93 Gusset ISA100x100x6x895 mm 4 Nos. 33.00 0.8 2.8 22
94 Pack plate 60x13760x6 mm 1 No. 26.00 13.9 --- ---
95 Diaphragm 140x532x12 mm 4 Nos. 28.00 2.7 10.8 86
96 Lifting lug 400x400x20 mm 4 Nos. 100.00 3.5 1.6 13
97 Lifting pl 670x1040x16 mm 4 Nos. 250.00 6.9 --- ---
98 Stiffener 146x1005x10 mm 4 Nos. 46.00 4.6 16.0 128
99 R / F plate 220/80 dia x 12 mm 4 Nos. 12.00 3.8 2.8 22
100 Stiffener 250x300x10 mm 4 Nos. 24.00 2.2 6.4 51
101 Stiffener 250x250x10 mm 4 Nos. 20.00 2.0 5.2 42
102 Stiffener 120x879x10 mm 2 Nos. 14.00 2.0 4.5 36
103 Stiffener 120x819x10 mm 2 Nos. 13.00 1.9 4.2 34
104 Bracing ISA75x75x8x2004 mm 2 Nos. 36.00 0.3 1.1 9
105 Bolts 16 diax 60 mm 4.00 --- --- ---
106 Bolts 16 dia x 35 mm 4.00 --- --- ---
107 Bolts 16 dia x 50 mm 40 Nos 7.00 --- --- ---
108 Bolts 16 dia x 75 mm 276 Nos 53.00 --- --- ---
109 Flange 190x600x10 mm 4 Nos. 36.00 3.2 6.3 50
110 Web plate 518x566x12 mm 4 Nos. 110.00 4.4 8.8 70
111 Stiffener 120x703x10 mm 4 Nos. 22.00 3.3 7.5 60
Seal assembly : ---
112 Bottom seal 14.00 Rm --- --- --- ---
113 Side seal 17.20 Rm --- --- --- ---
114 Seal clamp 70x3503x12 mm 2 Nos. 46.00 7.0 --- ---
115 Seal clamp 70x3389x12 mm 2 Nos. 45.00 6.8 --- ---
116 Seal clamp 45x3068x12 mm 4 Nos. 52.00 12.3 --- ---
117 Seal clamp 45x2414x12 mm 2 Nos. 20.00 4.8 --- ---
118 GI Bolt/Nut/Washer 12 diax65 mm 310 62.00 --- --- ---
Wheel assembly : ---
119 Wheels 410 mm dia x 200 mm 8 Nos. 528.00 --- --- ---
120 Bearings 8 Nos 80.00 --- --- ---
121 SS Pins 125/110/95 dia 8 Nos 176.00 --- --- ---
122 Bearing retainers 16 Nos. 128.00 --- --- ---
123 Spacers 8 Nos 8.00 2.0 --- ---
124 Spacers 8 Nos 8.00 2.0 --- ---
125 Cover 16 Nos 32.00 7.5 --- ---
126 GI Screws 15.00 --- --- ---
127 Keeper pl 60x210x10 mm 8 Nos. 8.00 2.2 --- ---
128 GI bolts 16 dia x 80 mm 16 Nos 4.00 --- --- ---
129 GI washers 4.00 --- --- ---
Guide shoe : ---
130 Base pl 220x220x20 mm 4 Nos. 32.00 1.8 --- ---
131 Guide pl 103x220x16 mm 8 Nos 24.00 2.6 3.5 28
132 Guide pl 32x220x20 mm 4 Nos 4.00 1.0 1.8 14

164
GATES AND HOISTS

133 Stiffener 70x95x10 mm 8 Nos 4.00 1.4 2.6 21


134 Pack plate 4 Nos 4.00 --- --- ---
135 GI Bolts 20 dia x 65 mm 16 Nos 6.00 --- --- ---
Total : 33025.00 694.5 1837.1 15351
kg Rm Rm Nos
ABSTRACT :
1. Structural steel : IS : 2062
Angle / Channel / Beam / Bars : 3299.00 kg
Plates / Flats : 28655.00 kg
2. Cast steel components : IS : 1030
Wheels / Guide roller : 656.00 kg
3. Alluminium / Bronze alloy components : IS : 305
Bearings / Bushes : 80.00 kg
4. Alloy steel components : IS : 1570
Wheel axle / lifting pin : 176.00 kg
5. Rubber seals : IS : 11855
Bottom rubber seal ( uncladed ) : 14.00 Rm
Side rubber seal ( uncladed ) : 17.20 Rm
6. Bolt / Nut / Washer IS : 1363
GI Bolt / Nut / Washer : 91.00 kg
MS Bolt / Nut / Washer : 68.00 kg
7. Other details :
Length of cutting : 694.50 Rm
Length of welding : 1837.10 Rm
Number of electrodes : 15351 Nos

21. Hoist supporting bridge for barrage gates .


Details of materials / Gas cutting / Welding for rate analysis :
Note : 1. Data based on 10 m ht & 15 m span hoist supporting bridge drawings of Hipparagi barrage.
2. Unless otherwise specified 6 mm fillet weld considered for computation of requirement of
welding electrodes.
3. Plate cutting considered for 2 sides assuming other 2 sides free face.
Sl No. DESCRIPTION OF MATERIALS Weight Gas cutting Weld length Number of
in kg length in m in m electrodes
Columns :
1 ISMB350 x 9918 mm 4 Nos. 2079.00 2.6 16.0 128
2 Base pl 340x550x20 mm 4 Nos. 179.00 3.6 5.0 40
3 Stiffener 100x550x20 mm 6 Nos. 52.00 3.9 6.6 53
4 Stiffener 300x530x12 mm 6 Nos. 90.00 5.0 6.4 51
5 Stiffener 90x300x12 mm 20 Nos. 51.00 7.8 15.6 125
6 Stiffener 100x326x20 mm 2 Nos. 10.00 0.9 2.1 17
7 Stiffener 100x100x20 mm 4 Nos. 6.00 1.2 2.4 19
8 Stiffener 78x300x12 mm 12 Nos. 26.00 4.5 9.1 73
9 Stiffener 210x430x12 mm 4 Nos. 34.00 2.6 2.7 22
10 Bracings ISA65x65x6x2127 mm 16 Nos. 197.00 2.1 8.5 68
11 Bracings ISA65x65x6x1120 mm 20 Nos. 130.00 2.6 10.6 85
12 Bracings ISA65x65x6x1781 mm 4 Nos. 41.00 0.6 2.1 17
13 Lacing ISA40x40x5x450 mm 30 Nos. 41.00 2.7 9.0 72
14 Tie beam ISMB300 x 2026 mm 6 Nos. 537.00 3.5 --- ---
15 Column cap 280x410x16 mm 4 Nos. 58.00 2.8 5.0 40
16 Gusset pl 170x330x12 mm 12 Nos. 63.00 6.0 13.9 111
17 Gusset pl 200x280x10 mm 20 Nos. 88.00 12.0 19.2 154
18 Stiffener 60x328x10 mm 40 Nos. 62.00 2.4 35.8 286
19 Anchor bolt 25 dia x 1200 mm 24 Nos 111.00 0.6 --- ---
20 Nuts 24 dia 48 Nos 4.00 --- --- ---
21 Plate washer 70x70x16 mm 24 Nos. 15.00 3.4 --- ---

165
GATES AND HOISTS

22 Bolt/Washer 20 dia x 70 mm 24 Nos 8.00 --- --- ---


23 Bolt/Washer 20 dia x 60 mm 16 Nos 4.00 --- --- ---
24 Stiffener 300x326x12 mm 2 Nos 19.00 1.3 3.7 30
25 Stiffener 60x159x10 mm 16 Nos. 12.00 3.5 8.9 71
26 Gusset pl 125x330x10 mm 8 Nos. 26.00 3.7 7.3 58
Beams and hoist supports :
27 Web plate 1000x15430x8 mm 1 No. 969.00 17.5 --- ---
28 Web plate 1008x15430x8 mm 1 No. 977.00 17.6 --- ---
29 Flange 150x15430x16 mm 2 Nos. 581.00 15.7 31.5 252
30 Flange 250x15430x20 mm 2 Nos. 1211.00 16.0 31.8 255
31 Bearing pl 250x380x16 mm 4 Nos. 48.00 2.6 2.0 16
32 Stiffener 180x1000x10 mm 4 Nos. 57.00 4.7 10.0 80
33 Stiffener 180x1008x10 mm 4 Nos. 60.00 4.8 10.1 81
34 Stiffener 130x1000x10 mm 11 Nos. 155.00 12.5 25.3 202
35 Stiffener 130x1008x10 mm 11 Nos. 113.00 13.0 25.5 204
36 Cross beam ISMC150x2392 mm 6 Nos 235.00 1.8 3.6 29
37 Cross beam ISMC200x2392 mm 2 Nos 106.00 0.8 3.2 26
38 Cross beam ISMC300x2392 mm 6 Nos 515.00 3.6 14.4 115
39 Cross beam ISMC200x1418 mm 4 Nos 126.00 1.6 6.4 51
40 Bracket 240x685x12 mm 4 Nos. 62.00 3.7 3.4 27
41 Bracket 240x555x12 mm 4 Nos. 50.00 3.2 3.4 27
42 R / F plate 220 dia x 12 mm 8 Nos. 29.00 5.5 5.5 44
43 Bracing ISA65x65x6x1437 mm 4 Nos. 33.00 0.5 2.1 17
44 Stiffener 75x808x10 mm 2 Nos. 10.00 1.8 3.8 31
45 Stiffener 100x800x10 mm 2 Nos. 13.00 1.8 4.0 32
46 Stiffener 75x708x10 mm 4 Nos. 17.00 3.1 6.9 55
47 Stiffener 100x700x10 mm 4 Nos. 22.00 3.2 7.2 58
48 Stiffener 75x858x10 mm 4 Nos. 20.00 3.7 7.3 58
49 Stiffener 100x850x10 mm 4 Nos. 27.00 3.8 8.4 67
50 Railing post ISA50x50x6x1160 mm 26 136.00 2.6 5.2 42
51 Railing plate 75x15430x6 mm 2 Nos. 109.00 31.0 2.6 21
52 Railing pipe 32 dia x15430 mm 2 Nos 80.00 --- 0.5 4
53 Railing pipe 25 dia x15430 mm 4 Nos 124.00 --- --- ---
54 Plate 70x2000x8 mm 4 Nos. 35.00 8.3 16.6 133
55 Splice plate 120x900x8 mm 4 Nos. 27.00 4.1 8.2 66
56 Splice plate 120x300x8 mm 2 Nos. 5.00 0.8 1.7 14
57 Splice plate 220x300x8 mm 2 Nos. 10.00 1.0 2.1 17
58 Splice plate 45x300x8 mm 4 Nos. 3.00 1.4 2.8 22
59 Splice plate 90x300x10 mm 4 Nos. 8.00 1.6 3.1 25
60 Chequered plate 25 sqm 133.00 10.0 5.0 40
61 Stiffener 65x184x8 mm 8 Nos. 6.00 2.0 5.0 40
62 Stiffener 75x278x10 mm 4 Nos. 7.00 1.4 3.4 27
63 Batten 100x300x10 mm 4 Nos. 9.00 1.6 0.8 7
64 Cross beam ISMC200x2392 mm 2 Nos 106.00 0.8 3.2 26
65 Cross beam ISMC200x600 mm 3 Nos 40.00 1.2 4.8 38
66 Cross beam ISMC150x600 mm 2 Nos 20.00 0.6 2.4 19
67 Bolts 26 & 16 dia 2.00 --- --- ---
Total : 10239.00 290.2 473.1 3788
kg Rm Rm Nos

ABSTRACT :
1. Structural steel : IS : 2062
Angles / Beams / Channels / Bars : 4453.00 kg
Structural steel Plates / Flats : 5431.00 kg
Chequered plate 133.00 kg
2 Bolt / Nut / Washer : IS : 1363

166
GATES AND HOISTS

MS Bolts / Nuts / Washers : 18.00 kg


MS pipes :
32 mm dia pipe 30.86 Rm
25 mm dia pipe 61.72 Rm
3 Other details :
Length of cutting : 290.20 Rm
Length of welding : 473.10 Rm
Number of electrodes ( str steel ) : 3788 Nos

22. Rope drum hoist for barrage gates .


Details of materials / Gas cutting / Welding for rate analysis :
Note : 1. Data based on rope drum hoist drawings for vertical lift roller gate of Hipparagi barrage.
2. Unless otherwise specified 6 mm fillet weld considered for computation of requirement of
welding electrodes.
3. Plate cutting considered for 2 sides assuming other 2 sides free face.
Sl No. DESCRIPTION OF MATERIALS Weight Gas cutting Weld length Number of
in kg length in m in m electrodes
Gear box :
1 Frame ISMC250x1800 mm 2 No. 104.00 1.0 --- ---
2 Frame ISMC250x1094 mm 2 No. 66.00 1.0 --- ---
3 Frame ISMC250x1432 mm 4 No. 174.00 2.0 8.0 64
4 Frame ISMC250x780 mm 2 No. 44.00 1.0 2.0 16
5 Frame ISMC250x330 mm 2 No. 22.00 1.0 4.0 32
6 Drum support 260x550x16 mm 4 Nos. 72.00 3.2 2.8 23
7 Stiffener 70x305x10 mm 8 Nos. 14.00 3.0 6.0 48
8 Stiffener 65x228x10 mm 12 Nos. 14.00 3.6 8.6 69
9 Stiffener 110x350x10 mm 4 Nos. 12.00 1.8 3.6 29
10 Stiffener 110x320x16 mm 4 Nos. 10.00 1.8 2.8 23
11 Bolts / Screws 3.00 --- --- ---
Rope drums :
1 Drum ( 632/566 dia )x1310 mm 2 Nos 680.00 --- --- ---
2 Bronze bush 125/100 diax130 mm 2 Nos 10.00 --- --- ---
3 Bronze bush 125/100 diax100 mm 2 Nos 8.00 --- --- ---
4 Spacers 4.00 --- --- ---
5 Clamping pl 33x150x100 4 Nos 16.00 --- --- ---
6 Bolts 24 dia x 90 mm 8 Nos 5.00 --- --- ---
7 Bolts 24 dia x 80 mm 12 Nos 8.00 --- --- ---
Gears and pinions :
Drum gear 2 Nos. 480.00 --- --- ---
1st gear 2 Nos 130.00 --- --- ---
1st pinion 2 Nos 76.00 --- --- ---
2nd pinion 2 Nos 22.00 --- --- ---
Shafts :
Drum shaft 100 diax1480 mm 2 Nos 182.00 --- --- ---
2nd pinion shaft 110 diax695 mm 1 Nos 52.00 --- --- ---
2nd pinion shaft 110 diax595 mm 1 Nos 44.00 --- --- ---
1st pinion shaft 75 diax763 mm 2 Nos 53.00 --- --- ---
Keys 28x150x16 mm 2 Nos. 1.00 --- --- ---
Keys 28x130x16 mm 2 Nos. 1.00 --- --- ---
Keys 20x115x12 mm 2 Nos. 1.00 --- --- ---
Pipe shaft :
MS pipe 200 dia x 4601 mm 2 Nos 391.00 --- --- ---
Flange 355/200 dia x12 mm 4 Nos 25.00 7.0 2.5 20
Flange 355/140 dia x12 mm 4 Nos 20.00 6.2 2.5 20
Hub 140/68 dia x 85 mm 2 Nos 16.00 --- 0.9 7
Stiffener 62x65x6 mm 16 Nos 3.00 2.0 4.0 32

167
GATES AND HOISTS

Stiffener 68x100x6 mm 16 Nos 5.00 2.7 5.4 43


Bolt/Nut/Washer 20 dia x50 mm 24 Nos 7.00 --- --- ---
Pulleys :
Pulley 622 mm dia 6 Nos 480.00 --- --- ---
Pulley 400 mm dia 2 Nos 120.00 --- --- ---
Bronze bush 115/90 mm dia 6 Nos 24.00 --- --- ---
Bronze bush 115/90 mm dia 2 Nos 8.00 --- --- ---
Pin 90 dia x 244 mm 6 Nos 72.00 --- --- ---
Pin 90 dia x 244 mm 2 Nos 24.00 --- --- ---
Spacers 16 Nos 16.00 --- --- ---
Keeper pl 40x140x10 mm 16 Nos 8.00 --- --- ---
Screws 2.00 --- --- ---
Other components :
Worm reducer 60 :1 ( size 800 ) 1 No. 500.00 --- --- ---
Electric motor 12.5 hp 1000 rpm 1 No. 60.00 --- --- ---
Electro-megnatic brake 1 No. 25.00 --- --- ---
Manual operation unit 1 No. 120.00 --- --- ---
Plummer block body 10 Nos 250.00 --- --- ---
Bronze bush 10 Nos 50.00 --- --- ---
Fexible couplings 2 Nos 50.00 --- --- ---
Position indicator unit 1 No. 50.00 --- --- ---
Wire rope 6/36 construction 160 Rm 435.00 --- --- ---
Total : 5069.00 37.3 53.1 426.0
kg Rm Rm Nos
ABSTRACT :
1. Structural steel : IS : 2062
Angle / Channel / Beam / Bars : 410.00 kg
Plates / Flats : 219.00 kg
2. Cast steel components : IS : 1030
Rope drums 2 Nos / Gears : 1290.00 kg
Pinions 98.00 kg
Pulleys 8 Nos / Couplings 2 Nos : 650.00 kg
Plummer blocks : 250.00 kg
3. Alloy steel components : IS : 1570
Shafts / Keys : 350.00 kg
Pins 96.00 kg
4. Alluminium / Bronze alloy components : IS : 305
Bearings / Bushes : 100.00 kg
5. Wire rope : IS : 2266
28 mm dia 6/36 construction rope : 160 Rm
6. Bolts / Nuts / Washers : IS : 1363
Bolts / Nuts / Washers ( various size ) : 25.00 kg
7. Other components :
Electric motor 12.5 hp Standard : 1 No.
Worm reducer 60 :1 ( size 800 ) 1 No. Standard : 1 No
Electro-megnatic brake Standard : 1 No
Manual operation assembly : 1 No.
Position indicator : 1 No.
8. Other details :
Length of cutting : 37.30 Rm
Length of welding : 53.10 Rm
Number of electrodes : 426 Nos

23. Embedded parts for Cross regulator radial gate :


Details of materials / Gas cutting / Welding for rate analysis :
Note : 1. Data based on embedded parts drawings for cross regulator radial gate of Alamatti LBC.

168
GATES AND HOISTS

2. Unless otherwise specified 5 mm fillet weld considered for computation of requirement of


welding electrodes.
3. Plate cutting considered for 2 sides assuming other 2 sides free face.
Sl No. DESCRIPTION OF MATERIALS Weight Gas cutting Weld length Number of
in kg length in m in m electrodes
First stage anchors :
1 Anchor plate 300x100x10 mm 7 Nos 16.00 0.7 --- ---
2 Anchor rod 20 dia x 615 mm 7 Nos 11.00 0.1 0.9 5
3 Anchor plate 300x100x10 mm 34 Nos 94.00 3.4 --- ---
4 Anchor rod 20 dia x 740 mm 34 Nos 63.00 0.7 4.3 26
Sill beam :
5 ISMB 200 x 3500 mm 1 No. 89.00 0.4 --- ---
6 SS plate 80x6x3100 mm 1 No. 12.00 0.1 6.3 38
7 Stiffener 200x190x10 mm 14 Nos 42.00 5.5 10.9 65
8 Plate 150x3500x10 mm 2 Nos 83.00 7.3 ( SV ) 7.0 105
9 Plate 300x100x10 mm 7 Nos 17.00 0.7 1.4 8
10 Anchor bolts 20 dia x 300 mm 14 Nos 10.00 --- 0.9 5
11 SS plate 120x100x6 mm 2 Nos. 2.00 0.2 0.2 1
Wall plates :
12 Plate 500x350x10 mm 2 Nos 27.00 1.7 ( SV ) 0.7 10
13 Plate 1500x350x10 mm 10 Nos 412.00 18.5 ( SV ) 3.5 52
14 Plate 600x350x10 mm 2 Nos 33.00 1.9 ( SV ) 0.7 10
15 SS plate 80x5000x6 mm 2 Nos 38.00 0.2 20.0 120
16 ISA 75x75x8 mm x 100 mm 68 Nos 60.00 10.2 13.6 81
17 Anchor bolts 20 dia x 190 mm 68 Nos 32.00 --- 4.4 26
Anchor girders : ( All welds 6 mm fillet )
18 Plate 450x2226x12 mm 2 Nos 189.00 5.4 --- ---
19 Plate 276x2226x12 mm 2 Nos 116.00 4.9 13.6 109
20 Stiffener 138x276x12 mm 6 Nos 22.00 2.5 6.6 53
21 Stiffener 144x276x12 mm 12 Nos 45.00 5.0 13.5 108
22 End plate 450x300x12 mm 2 Nos 25.00 1.5 2.4 19
23 Stiffener 138x200x12 mm 6 Nos 16.00 2.0 4.0 32
24 Stiffener 144x200x12 mm 12 Nos 33.00 4.1 8.2 66
25 Bolt/Nut/Washer 24 diax60 mm 16 Nos 8.00 --- --- ---
Anchor bar and chairs : ( All welds 8 mm fillet )
26 Anchor bars 40 dia x 4500 mm 12 Nos 533.00 0.5 --- ---
27 Anchor plate 200x200x20 mm 24 Nos 151.00 9.6 6.0 72
28 Anchor bars 25 dia x 1200 mm 12 Nos 56.00 0.3 --- ---
29 Anchor plate 80x80x16 mm 12 Nos 10.00 2.0 1.9 23
30 Plate 250x325x20 mm 4 Nos 52.00 2.3 --- ---
31 Plate 130x250x20 mm 2 Nos 11.00 0.8 2.0 24
32 Plate 250x325x20 mm 2 Nos 25.00 1.2 2.0 24
33 Stiffener 195x325x20 mm 2 Nos 20.00 1.0 3.4 41
34 Plate 250x340x20 mm 2 Nos 27.00 1.2 2.0 24
35 Stiffener 90x325x20 mm 2 Nos 9.00 0.8 1.9 23

169
GATES AND HOISTS

36 Nuts / Washers for anchor bars 15.00 --- --- ---


Total : 2404.00 96.7 142.3 1170
kg Rm Rm Nos
ABSTRACT :
1. Structural steel : IS :2062
Angle / Channel / Beam / Bars : 812.00 kg
Plates / Flats : 1475.00 kg
2. Alloy steel components : IS : 1570
Stainless steel plates : 52.00 kg
3. Bolt / Nut / Washer : IS :1363
MS Bolt / Nut / Washer : 65.00 kg
4. Other details :
Length of cutting : 96.70 Rm
Length of welding : 142.30 Rm
Number of electrodes 4x450 mm : 1170 Nos

24. Radial gate for Cross regulator :


Details of materials / Gas cutting / Welding for rate analysis :
Note : 1. Data based on radial gate drawings for cross regulator radial gate of Alamatti LBC.
2. Unless otherwise specified 6 mm fillet weld considered for computation of requirement of
welding electrodes.
3. Plate cutting considered for 2 sides assuming other 2 sides free face.
Sl No. DESCRIPTION OF MATERIALS Weight Gas cutting Weld length Number of
in kg length in m in m electrodes
Trunnions / Brackets / Tie beam :
1 Tie beam ISMB 250 x 2200 mm 1 No. 82.00 0.5 1.6 7
2 Plate 250x400x12 mm 4 Nos 38.00 4.2 2.6 21
3 Pin 90 dia x 370 mm 2 Nos 37.00 --- --- ---
4 Trunnion hub 180/110x250 mm 2 Nos 92.00 --- --- ---
5 Trunnion bush 110/90 x 260 mm 2 Nos 13.00 --- --- ---
6 Plate 350x450x20 mm 4 Nos 99.00 6.2 2.3 28
7 Stiffener 220x450x20 mm 4 Nos 62.00 2.7 9.0 72
8 Plate 300x160x20 mm 4 Nos 30.00 1.9 2.9 23
9 Bolt/Nut/Washer 20 dia x 100 mm 24 Nos 16.00 --- --- ---
10 Bracket base pl 450x400x20 mm 2 Nos 57.00 1.7 --- ---
11 Bracket pl 350x350x20 mm 4 Nos 77.00 4.5 2.8 23
12 Stiffener 280x80x20 mm 6 Nos 21.00 0.5 5.3 43
13 Stiffener 130x80x20 mm 4 Nos 7.00 0.3 2.3 18
14 Keeper pl 140x60x20 mm 4 Nos 3.00 0.3 --- ---
15 Screws 16 dia x 30 mm 8 Nos 1.00 --- --- ---
16 Bolt/Nut/Washer 20 dia x 100 mm 16 Nos 10.00 --- --- ---
Sector arms and Horizontal girders :
17 Sector arm ISMB 250 x 5150 mm 4 Nos 768.00 2.0 --- ---
18 Bracing ISMB 250 x 2200 mm 2 Nos 164.00 1.0 4.0 32
19 ISA 75x75x8 x 1900 mm 4 Nos 68.00 0.6 1.8 14
20 ISA 75x75x8 x 1400 mm 4 Nos 50.00 0.6 1.8 14
21 ISA 75x75x8 x 1900 mm 4 Nos 68.00 0.6 1.8 14
22 ISA 75x75x8 x 550 mm 4 Nos 20.00 0.6 1.8 14
23 Gusset pl 250x150x10 mm 4 Nos 12.00 1.6 1.6 13
24 Gusset pl 200x150x10 mm 4 Nos 10.00 1.4 1.4 11
25 Gusset pl 250x200x10 mm 4 Nos 16.00 1.8 1.8 14
26 Gusset pl 200x200x10 mm 4 Nos 13.00 1.6 1.6 13
27 Gusset pl 250x200x10 mm 4 Nos 16.00 1.8 1.8 14
28 Plate 280x160x20 mm 4 Nos 28.00 1.8 4.0 32
29 Plate 300x160x20 mm 4 Nos 30.00 1.8 4.0 32
30 Bolt/Nut/Washer 20 dia x 70 mm 24 Nos 12.00 --- --- ---

170
GATES AND HOISTS

31 H-Girder ISMB 300 x 2900 mm 2 Nos 256.00 1.8 --- ---


32 Stiffener 70x320x20 mm 16 Nos 56.00 6.3 14.7 118
33 Plate 300x160x20 mm 4 Nos 30.00 1.8 3.7 30
34 Bolt/Nut/Washer 20 dia x 100 mm 24 Nos 15.00 --- --- ---
35 ISA 75x75x8 x 1994 mm 3 Nos 53.00 0.5 1.3 10
36 ISA 75x75x8 x 2150 mm 2 Nos 38.00 0.3 0.9 7
37 Gusset pl 200x200x10 mm 3 Nos 9.00 1.2 1.2 9
38 Gusset pl 240x200x10 mm 2 Nos 8.00 0.9 0.8 6
39 Gusset pl 300x200x10 mm 1 Nos 5.00 0.5 0.5 4
Skin plate assembly :
40 Skin plate 2880x4950x10 mm 1 No. 1119.00 12.8 5.0 115
41 Tee ISMB 250/2 x 4950 mm 6 Nos 554.00 14.9 59.4 475
42 Top plate 150x2880x10 mm 1 Nos 34.00 3.0 6.0 48
43 Stiffener 120x120x10 mm 14 Nos 16.00 3.4 6.7 54
44 Bottom pl 150x2880x10 mm 1 No. 34.00 3.0 3.8 31
45 Seal support 10x10x2880 1 No. 2.00 --- 5.8 46
46 Side clamp ISA 45x45x6x5000 mm 2 Nos 40.00 0.2 --- ---
47 Bottom clamp 70x2880x10 mm 1 No 16.00 3.0 --- ---
48 Z - seal 5000 mm 2 Nos --- --- --- ---
49 Flat seal 3000 mm 1 No. --- --- --- ---
50 Back plate 60x5000x10 mm 1 No. 24.00 --- 10.0 80
51 GI Bolt/Nut/Washer 12 dia x 50 mm 140 14.00 --- --- ---
Guide roller assembly :
52 Plates 48.00 5.2 2.9 24
53 Guide roller 4 Nos 30.00 --- --- ---
54 Bronze bush 4 Nos 6.00 --- --- ---
55 Pins 4 Nos 4.00 --- --- ---
56 GI Bolt/Nut/Washer 12 dia x 50 mm 16 2.00 --- --- ---
Pulley supports in gate :
57 Bracket pl 300x350x20 mm 4 Nos 66.00 2.7 5.2 42
58 Plate 160x400x6 mm 2 Nos 6.00 1.1 3.2 26
59 Plate 300x360x20 mm 2 Nos 34.00 1.3 1.9 15
60 Stiffener 70x150x10 mm 8 Nos 7.00 2.0 3.5 28
61 Stiffener 123x220x10 mm 4 Nos 9.00 1.4 2.8 22
4455.00 107.3 195.5 1642
Total : kg Rm Rm Nos
ABSTRACT :
1. Structural steel : IS : 2062
Angles / Beams / Channels / Bars : 2161.00 kg
Plates / Flats : 2042.00 kg
2. Cast steel components : IS : 1030
Trunnion hub / Guide roller : 122.00 kg
3. Alloy steel components : IS : 1570
Pins : 41.00 kg
4. Alluminium / Bronze alloy components : IS : 305
Trunnion & Guide roller bush : 19.00 kg
5. Bolt / Nut / Washer IS :1363
GI Bolts / Nuts / Washers : 16.00 kg
MS Bolts / Nuts / Washers / Screws : 54.00 kg
6. Rubber seals : IS : 11855
Bottom seal : 3.00 Rm
Side seals : 10.00 Rm
7. Other details :
Length of cutting : 107.30 Rm

171
GATES AND HOISTS

Length of welding : 195.50 Rm


Number of electrodes : 1642 Nos

25. Rope drum hoist for regulator radial gate :


Details of materials / Gas cutting / Welding for rate analysis :
Note : 1. Data based on rope drum hoist drawings for cross regulator radial gate of Alamatti LBC.
2. Unless otherwise specified 5 mm fillet weld considered for computation of requirement of
welding electrodes.
3. Plate cutting considered for 2 sides assuming other 2 sides free face.
Sl No. DESCRIPTION OF MATERIALS Weight Gas cutting Weld length Number of
in kg length in m in m electrodes
Embedments :
1 Anchor bolts 20 dia x 750 mm 16 Nos 30.00 0.4 1.0 6
2 Bolt / Nut / Washers 2.00 --- --- ---
3 Plate 220x280x20 mm 8 Nos 77.00 4.0 --- ---
Hoist supporting structure :
4 Girder ISMB-250 x 3600 mm 2 Nos 269.00 1.0 --- ---
5 Rib plate 225x250x10 mm 8 Nos 35.00 3.8 1.8 11
6 ISMC- 150 x 500 mm 2 Nos 17.00 0.6 2.4 14
7 ISMC- 150 x 1990 mm 2 Nos 61.00 0.6 2.4 14
8 ISMC- 250 x 790 mm 2 Nos 54.00 0.8 4.0 24
9 ISMC- 250 x 1990 mm 4 Nos 272.00 1.6 8.0 48
10 ISMC- 250 x 570 mm 4 Nos 78.00 1.7 8.0 48
11 MS pipe 32 dia x 5250 mm 2 Nos 42.00 --- 0.5 3
12 Flat 50x3100x8 mm 2 Nos 20.00 0.1 0.8 5
13 ISA 65x65x6 mm x 1130 mm 6 Nos 39.00 0.8 --- ---
14 ISA 65x65x6 mm x 3600 mm 2 Nos 42.00 0.3 14.4 86
15 Bolt/Nut/Washer 12 diax50 mm 12 Nos 2.00 --- --- ---
16 Rib plate 200x250x10 mm 6 Nos 14.00 2.7 4.6 28
17 Chequered pl 400x687x6 mm 2 Nos 29.00 2.2 2.2 13
18 Chequered pl 525x1935x6 mm 2 Nos 109.00 4.9 4.9 29
19 Chequered pl 247x560x6 mm 1 No. 7.00 0.8 0.8 5
20 Chequered pl 587x630x6 mm 2 Nos 40.00 2.4 2.4 14
21 Chequered pl 162x560x6 mm 1 No. 5.00 0.8 0.8 5
22 Plate 250x350x16 mm 4 Nos 44.00 2.4 3.2 19
23 R/F plate 120/62 dia x 8 mm 4 Nos 1.00 2.3 1.5 9
24 Plate 120x470x20 mm 2 Nos 18.00 1.2 0.8 5
25 Plate 80x80x10 mm 4 Nos 2.00 0.6 1.3 8
Pulleys and accessories :
26 CI Pulley 300 dia 2 Nos 36.00 --- --- ---
27 Pin 60 dia x 200 mm 2 Nos 16.00 --- --- ---
28 Bronz bush 80/60 dia x 50 mm 2 Nos 2.00 --- --- ---
29 Plate 40x90x8 mm 4 Nos 2.00 0.5 --- ---
30 Bolt/Nut/Washer 12 diax30 mm 16 Nos 2.00 --- --- ---
31 Pulley pin 50 dia x 250 mm 2 Nos 8.00 --- --- ---
32 Lock plate 50x90x10 mm 8 Nos 8.00 --- --- ---
33 Spacer 130/60 dia x 25 mm 2 Nos 6.00 --- --- ---
34 Spacer 130/60 dia x 8 mm 4 Nos 2.50 --- --- ---
35 CI Pulley 276 dia 4 Nos 72.00 --- --- ---
36 Bronz bush 80/60 dia x 60 mm 4 Nos 4.50 --- --- ---
Gear box :
37 ISMC 250 x 880 mm 2 Nos. 60.00 1.0 --- ---
38 ISMC 250 x 570 mm 2 Nos. 39.00 1.0 0.8 5
39 ISMC 250 x 660 mm 2 Nos. 45.00 1.0 0.8 5
40 ISMC 250 x 450 mm 2 Nos. 31.00 1.0 0.8 5
41 ISMC 250 x 260 mm 2 Nos. 14.00 1.0 0.8 5

172
GATES AND HOISTS

42 ISMC 250 x 400 mm 2 Nos. 27.00 1.0 1.6 10


43 Plate 60x880x10 mm 2 Nos 8.00 0.2 1.8 11
44 Plate 60x220x10 mm 2 Nos 2.00 0.2 0.7 4
45 Stiffener 75x90x10 mm 12 Nos 4.00 2.0 3.9 23
46 Plate 250x400x20 mm 4 Nos 63.00 2.6 4.0 24
47 Plate 75x240x10 mm 2 Nos 3.00 0.6 1.6 10
48 Plate 130x240x10 mm 8 Nos 20.00 3.0 6.4 38
49 Plate 80x290x20 mm 4 Nos 15.00 1.5 3.0 18
Drive stool :
50 ISMC 150 x 1525 mm 2 Nos 51.00 0.6 --- ---
51 ISMC 150 x 500 mm 3 Nos 25.00 0.9 3.0 18
52 ISA 75x75x8 mm x 500 mm 4 Nos 14.00 0.6 2.4 14
53 Plate 230x280x8 mm 1 No 4.00 0.6 0.5 3
54 Plate 312x330x8 mm 1 No 7.00 0.7 0.7 4
55 ISA 75x75x8 mm x 500 mm 2 Nos 7.00 0.3 0.2 1
56 Plate 65x100x8 mm 3 Nos 1.00 --- --- ---
57 Bolt/Nut/Washer 16 dia x 60 mm 10 Nos 3.50 --- --- ---
58 Bolt/Nut/Washer 20 dia x 100 mm 4 Nos 2.00 --- --- ---
59 Bolt/Nut/Washer 10 dia x 50 mm 4 Nos 0.50 --- --- ---
60 Bolt/Nut/Washer 12 dia x 50 mm 4 Nos 0.50 --- --- ---
61 Bolt/Nut/Washer 12 dia x 50 mm 12 Nos 1.50 --- --- ---

Drums / Gears / Pinions / Shafts


62 Rope drum 300 dia x 470 mm 2 Nos 240.00 --- --- ---
63 Drum gear 2 Nos 144.00 --- --- ---
64 Drum shaft 60 dia x 610 mm 2 Nos 31.00 --- --- ---
65 First pinion 2 Nos 14.00 --- --- ---
66 Pinion shaft 60 dia x 540 mm 2 Nos 28.00 --- --- ---
67 Bearings 4 Nos 4.00 --- --- ---
68 Plummer blocks for pinions 4 Nos 20.00 --- --- ---
69 Line shaft 50 dia x 431 mm 2 Nos 16.00 --- --- ---
70 Flexible coupling 50 dia 4 Nos 20.00 --- --- ---
71 Lock plate 180x50x8 mm 4 Nos 3.00 0.2 --- ---
72 Bolt/Nut/Washer 16 diax30 mm 8 Nos 1.00 --- --- ---
73 Bolt/Nut/Washer 16 diax75 mm 24 Nos 6.00 --- --- ---
74 Bolt/Nut/Washer 10 diax40 mm 100 Nos 10.00 --- --- ---
75 Bolt/Nut/Washer 16 diax100 mm 8 Nos 2.00 --- --- ---
76 Spacer pl 150/62 dia x 8 mm 4 Nos 2.00 2.6 1.9 11
Gear box cover :
77 Plate 50x416x5 mm 2 Nos 2.00 0.1 0.9 5
78 IAS 45x45x5 mm x1920 mm 2 Nos 17.00 0.2 0.2 1
79 IAS 45x45x5 mm x1900 mm 4 Nos 35.00 0.4 0.4 2
80 Plate 50x600x5 mm 2 Nos 2.00 0.1 1.3 8
81 Plate 340x1600x3 mm 2 Nos 27.00 3.9 2.0 12
82 Plate 420x850x3 mm 2 Nos 18.00 3.8 2.0 12
83 Plate 420x850x3 mm 2 Nos 18.00 4.0 2.0 12
84 Plate 50x1600x5 mm 2 Nos 7.00 0.1 1.5 9
85 Plate 50x1200x5 mm 2 Nos 5.00 0.1 1.0 6
86 Inspection cover 200x200x3 mm 2 Nos 2.00 0.8 --- ---
87 Handle 16 dia 250 mm 6 Nos 3.00 0.1 0.6 4
Drive unit cover :
88 IAS 45x45x5 mm x590 mm 2 Nos 4.00 0.2 0.2 1
89 IAS 45x45x5 mm x247 mm 2 Nos 2.00 0.2 0.2 1
90 IAS 45x45x5 mm x1037 mm 2 Nos 7.00 0.2 0.2 1
91 IAS 45x45x5 mm x940 mm 2 Nos 6.00 0.2 0.2 1
92 IAS 45x45x5 mm x1570 mm 2 Nos 11.00 0.2 0.2 1

173
GATES AND HOISTS

93 IAS 45x45x5 mm x520 mm 2 Nos 4.00 0.2 0.2 1


94 Plate 550x580x3 mm 1 No. 8.00 1.1 1.1 6
95 Plate 930x1495x3 mm 2 Nos 34.00 4.9 4.5 27
96 Plate 550x930x3 mm 1 No 13.00 1.5 1.5 9
97 Plate 50x715x3 mm 2 Nos 2.00 0.1 1.5 9
98 Plate 620x1600x3 mm 1 No 25.00 2.3 2.0 12
99 Plate 200x200x3 mm 1 No 1.00 0.4 --- ---
100 Plate 250x400x3 mm 1 No 2.00 0.7 1.0 6
101 Plate 100x100x3 mm 1 No 0.50 0.2 0.4 2
102 Flat 50x350x5 mm 2 Nos 1.00 0.10 1.4 8
103 Flat 50x100x5 mm 2 Nos 1.00 0.10 0.4 2
104 Flat 50x350x5 mm 2 Nos 1.00 0.10 0.7 4
105 Handle 16 dia x 450 mm 4 Nos 3.00 0.10 0.8 5
106 Handle 16 dia x 350 mm 2 Nos 1.00 --- 0.4 2
107 Bolt/Nut/Washer 20 dia x 30 mm 30 Nos 2.00 --- --- ---
108 Bolt/Nut/Washer 12 diax40 mm 12 Nos 1.00 --- --- ---
Other components :
109 Steel wire rope 12 dia 6x36 - 2 x 35 m 40.00 --- --- ---
110 Rope socket with pin 2 Nos 14.00 --- --- ---
111 Elecon gear unit 1 No 102.00 --- --- ---
112 Electric motor 2 hp 1 No. 44.00 --- --- ---
113 Ele-magnetic brake 18.00 --- --- ---
114 Brake drum coupling 150 dia 7.00 --- --- ---
Total : 2947.50 85.5 129.5 772
kg Rm Rm Nos

Manual operation assembly :


115 IAS 50x50x5 mm x 775 mm 4 Nos 14.00 0.4 0.6 4
116 Plummer blocks - sprocket shafts 3 Nos 6.00 --- --- ---
117 Handle 1.50 --- --- ---
118 Round 32 dia x 500 m / c 3.00 --- --- ---
119 ISA 50x50x6 mm x 300 mm 2 Nos 3.00 0.2 0.4 2
120 ISA 75x75x8 mm x 210 mm 1 No 2.00 0.2 0.6 4
121 Round 32 dia x 361 m / c 2.00 --- --- ---
122 Dog clutch 45 dia and lever 15.00 --- --- ---
123 Sprocket 30 theeth 4.50 --- --- ---
124 Sprocket 15 theeth 1.00 --- --- ---
125 Sprocket chain 2.50 --- --- ---
126 Bolt/Nut/Washer 10 dia x 40 mm 6 Nos 0.50 --- --- ---
55.00
ABSTRACT :
1. Structural steel : IS : 2062
Angles / Beams / Channels / Bars : 1238.00 kg
Plates / Flats : 531.00 kg
Chequered plate 190.00 kg
2. Cast steel components : IS : 1030
Rope drums 2 Nos Gears 2 Nos : 384.00 kg
Pinions : 14.00 kg
Pulleys 6 Nos : 108.00 kg
Plummer blocks 6 Nos / couplings : 47.00 kg
3. Alloy steel components : IS : 1570
Shafts : 75.00 kg
Pins 24.00 kg

174
GATES AND HOISTS

4. Alluminium/ Bronze alloy components : IS : 305


Bearings / Bush : 10.50 kg
Bolt / Nut / Washers IS : 1363
MS Bolts / Nuts / Washers : 66.00 kg
5. Wire rope : IS : 2266
12 mm dia 6 / 36 construction 2 x 35 Rm : 40.00 kg
6. Other components :
Manual operating system : 1 No.
Worm reducer : 1 Nos
Electric motor 2 hp : 1 No.
Ele-magnetic brake : 1 No.
Rope socket with pin 2 Nos
MS pipe 32 mm dia : 10.50 Rm
7. Other details :
Length of cutting : 85.50 Rm
Length of welding : 129.50 Rm
Number of electrodes : 772 Nos

26. Manually operated Rope drum hoist for regulator radial gate :
Details of materials / Gas cutting / Welding for rate analysis :
Note : 1. Data based on rope drum hoist drawings for cross regulator radial gate of Alamatti LBC
without considering drive unit.
2. Unless otherwise specified 5 mm fillet weld considered for computation of requirement of
welding electrodes.
3. Plate cutting considered for 2 sides assuming other 2 sides free face.
Sl No. DESCRIPTION OF MATERIALS Weight Gas cutting Weld length Number of
in kg length in m in m electrodes
Embedments :
1 Anchor bolts 20 dia x 750 mm 16 Nos 30.00 0.4 1.0 6
2 Bolt / Nut / Washers 2.00 --- --- ---
3 Plate 220x280x20 mm 8 Nos 77.00 4.0 --- ---
Hoist supporting structure :
4 Girder ISMB-250 x 3600 mm 2 Nos 269.00 1.0 --- ---
5 Rib plate 225x250x10 mm 8 Nos 35.00 3.8 1.8 11
6 ISMC- 150 x 500 mm 2 Nos 17.00 0.6 2.4 14
7 ISMC- 150 x 1990 mm 2 Nos 61.00 0.6 2.4 14
8 ISMC- 250 x 790 mm 2 Nos 54.00 0.8 4.0 24
9 ISMC- 250 x 1990 mm 4 Nos 272.00 1.6 8.0 48
10 ISMC- 250 x 570 mm 4 Nos 78.00 1.7 8.0 48
11 MS pipe 32 dia x 5250 mm 2 Nos 42.00 --- 0.5 3
12 Flat 50x3100x8 mm 2 Nos 20.00 0.1 0.8 5
13 ISA 65x65x6 mm x 1130 mm 6 Nos 39.00 0.8 --- ---
14 ISA 65x65x6 mm x 3600 mm 2 Nos 42.00 0.3 14.4 86
15 Bolt/Nut/Washer 12 diax50 mm 12 Nos 2.00 --- --- ---
16 Rib plate 200x250x10 mm 6 Nos 14.00 2.7 4.6 28
17 Chequered pl 400x687x6 mm 2 Nos 29.00 2.2 2.2 13
18 Chequered pl 525x1935x6 mm 2 Nos 109.00 4.9 4.9 29
19 Chequered pl 247x560x6 mm 1 No. 7.00 0.8 0.8 5
20 Chequered pl 587x630x6 mm 2 Nos 40.00 2.4 2.4 14
21 Chequered pl 162x560x6 mm 1 No. 5.00 0.8 0.8 5
22 Plate 250x350x16 mm 4 Nos 44.00 2.4 3.2 19
23 R/F plate 120/62 dia x 8 mm 4 Nos 1.00 2.3 1.5 9
24 Plate 120x470x20 mm 2 Nos 18.00 1.2 0.8 5
25 Plate 80x80x10 mm 4 Nos 2.00 0.6 1.3 8
Pulleys and accessories :
26 CI Pulley 300 dia 2 Nos 36.00 --- --- ---

175
GATES AND HOISTS

27 Pin 60 dia x 200 mm 2 Nos 16.00 --- --- ---


28 Bronz bush 80/60 dia x 50 mm 2 Nos 2.00 --- --- ---
29 Plate 40x90x8 mm 4 Nos 2.00 0.5 --- ---
30 Bolt/Nut/Washer 12 diax30 mm 16 Nos 2.00 --- --- ---
31 Pulley pin 50 dia x 250 mm 2 Nos 8.00 --- --- ---
32 Lock plate 50x90x10 mm 8 Nos 8.00 --- --- ---
33 Spacer 130/60 dia x 25 mm 2 Nos 6.00 --- --- ---
34 Spacer 130/60 dia x 8 mm 4 Nos 2.50 --- --- ---
35 CI Pulley 276 dia 4 Nos 72.00 --- --- ---
36 Bronz bush 80/60 dia x 60 mm 4 Nos 4.50 --- --- ---
Gear box :
37 ISMC 250 x 880 mm 2 Nos. 60.00 1.0 --- ---
38 ISMC 250 x 570 mm 2 Nos. 39.00 1.0 0.8 5
39 ISMC 250 x 660 mm 2 Nos. 45.00 1.0 0.8 5
40 ISMC 250 x 450 mm 2 Nos. 31.00 1.0 0.8 5
41 ISMC 250 x 260 mm 2 Nos. 14.00 1.0 0.8 5
42 ISMC 250 x 400 mm 2 Nos. 27.00 1.0 1.6 10
43 Plate 60x880x10 mm 2 Nos 8.00 0.2 1.8 11
44 Plate 60x220x10 mm 2 Nos 2.00 0.2 0.7 4
45 Stiffener 75x90x10 mm 12 Nos 4.00 2.0 3.9 23
46 Plate 250x400x20 mm 4 Nos 63.00 2.6 4.0 24
47 Plate 75x240x10 mm 2 Nos 3.00 0.6 1.6 10
48 Plate 130x240x10 mm 8 Nos 20.00 3.0 6.4 38
49 Plate 80x290x20 mm 4 Nos 15.00 1.5 3.0 18
Drive stool :
50 ISMC 150 x 1525 mm 2 Nos 51.00 0.6 --- ---
51 ISMC 150 x 500 mm 3 Nos 25.00 0.9 3.0 18
52 ISA 75x75x8 mm x 500 mm 4 Nos 14.00 0.6 2.4 14
53 Plate 230x280x8 mm 1 No 4.00 0.6 0.5 3
54 Plate 312x330x8 mm 1 No 7.00 0.7 0.7 4
55 ISA 75x75x8 mm x 500 mm 2 Nos 7.00 0.3 0.2 1
56 Plate 65x100x8 mm 3 Nos 1.00 --- --- ---
57 Bolt/Nut/Washer 16 dia x 60 mm 10 Nos 3.50 --- --- ---
58 Bolt/Nut/Washer 20 dia x 100 mm 4 Nos 2.00 --- --- ---
59 Bolt/Nut/Washer 10 dia x 50 mm 4 Nos 0.50 --- --- ---
60 Bolt/Nut/Washer 12 dia x 50 mm 4 Nos 0.50 --- --- ---
61 Bolt/Nut/Washer 12 dia x 50 mm 12 Nos 1.50 --- --- ---

Drums / Gears / Pinions / Shafts


62 Rope drum 300 dia x 470 mm 2 Nos 240.00 --- --- ---
63 Drum gear 2 Nos 144.00 --- --- ---
64 Drum shaft 60 dia x 610 mm 2 Nos 31.00 --- --- ---
65 First pinion 2 Nos 14.00 --- --- ---
66 Pinion shaft 60 dia x 540 mm 2 Nos 28.00 --- --- ---
67 Bearings 4 Nos 4.00 --- --- ---
68 Plummer blocks for pinions 4 Nos 20.00 --- --- ---
69 Line shaft 50 dia x 431 mm 2 Nos 16.00 --- --- ---
70 Flexible coupling 50 dia 4 Nos 20.00 --- --- ---
71 Lock plate 180x50x8 mm 4 Nos 3.00 0.2 --- ---
72 Bolt/Nut/Washer 16 diax30 mm 8 Nos 1.00 --- --- ---
73 Bolt/Nut/Washer 16 diax75 mm 24 Nos 6.00 --- --- ---
74 Bolt/Nut/Washer 10 diax40 mm 100 Nos 10.00 --- --- ---
75 Bolt/Nut/Washer 16 diax100 mm 8 Nos 2.00 --- --- ---
76 Spacer pl 150/62 dia x 8 mm 4 Nos 2.00 2.6 1.9 11
Gear box cover :
77 Plate 50x416x5 mm 2 Nos 2.00 0.1 0.9 5

176
GATES AND HOISTS

78 IAS 45x45x5 mm x1920 mm 2 Nos 17.00 0.2 0.2 1


79 IAS 45x45x5 mm x1900 mm 4 Nos 35.00 0.4 0.4 2
80 Plate 50x600x5 mm 2 Nos 2.00 0.1 1.3 8
81 Plate 340x1600x3 mm 2 Nos 27.00 3.9 2.0 12
82 Plate 420x850x3 mm 2 Nos 18.00 3.8 2.0 12
83 Plate 420x850x3 mm 2 Nos 18.00 4.0 2.0 12
84 Plate 50x1600x5 mm 2 Nos 7.00 0.1 1.5 9
85 Plate 50x1200x5 mm 2 Nos 5.00 0.1 1.0 6
86 Inspection cover 200x200x3 mm 2 Nos 2.00 0.8 --- ---
87 Handle 16 dia 250 mm 6 Nos 3.00 0.1 0.6 4
Other components :
88 Steel wire rope 12 dia 6x36 - 2 x 35 m 40.00 --- --- ---
89 Rope socket with pin 2 Nos 14.00 --- --- ---
90 Elecon gear unit 1 No 102.00 --- --- ---
Total : 2749.00 72.7 112.6 674
kg Rm Rm Nos

Manual operation assembly :


91 IAS 50x50x5 mm x 775 mm 4 Nos 14.00 0.4 0.6 4
92 Plummer blocks - sprocket shafts 3 Nos 6.00 --- --- ---
93 Handle 1.50 --- --- ---
94 Round 32 dia x 500 m / c 3.00 --- --- ---
95 ISA 50x50x6 mm x 300 mm 2 Nos 3.00 0.2 0.4 2
96 ISA 75x75x8 mm x 210 mm 1 No 2.00 0.2 0.6 4
97 Round 32 dia x 361 m / c 2.00 --- --- ---
98 Dog clutch 45 dia and lever 15.00 --- --- ---
99 Sprocket 30 theeth 4.50 --- --- ---
100 Sprocket 15 theeth 1.00 --- --- ---
101 Sprocket chain 2.50 --- --- ---
102 Bolt/Nut/Washer 10 dia x 40 mm 6 Nos 0.50 --- --- ---
55.00
ABSTRACT :
1. Structural steel : IS : 2062
Angles / Beams / Channels / Bars : 1193.00 kg
Plates / Flats : 442.00 kg
Chequered plate 190.00 kg
2. Cast steel components : IS : 1030
Rope drums 2 Nos Gears 2 Nos : 384.00 kg
Pinions : 14.00 kg
Pulleys 6 Nos : 108.00 kg
Plummer blocks 6 Nos / couplings : 47.00 kg
3. Alloy steel components : IS : 1570
Shafts : 75.00 kg
Pins 24.00 kg
4. Alluminium/ Bronze alloy components : IS : 305
Bearings / Bush : 10.50 kg
Bolt / Nut / Washers IS : 1363
MS Bolts / Nuts / Washers : 63.00 kg
5. Wire rope : IS : 2266
12 mm dia 6 / 36 construction 2 x 35 Rm : 40.00 kg
6. Other components :
Manual operating system : 1 No.
Worm reducer : 1 Nos
Rope socket with pin 2 Nos
MS pipe 32 mm dia : 10.50 Rm
7. Other details :

177
GATES AND HOISTS

Length of cutting : 73 Rm
Length of welding : 113 Rm
Number of electrodes : 674 Nos

27. Embedded parts for vertical lift Regulator / Escape gate :


( With top seal seat arrangement )
Details of materials / Gas cutting / Welding for rate analysis :
Note : 1. Data based on embedded parts drawings for vertical lift roller gate of Alamatti LBC escape.
2. Unless otherwise specified 5 mm fillet weld considered for computation of requirement of
welding electrodes.
3. Plate cutting considered for 2 sides assuming other 2 sides free face.
Sl No. DESCRIPTION OF MATERIALS Weight Gas cutting Weld length Number of
in kg length in m in m electrodes
Sill beam :
1 SS seal seat 60x2200x6 mm 1 No. 6.50 0.1 ( F4 ) 4.5 23
2 Plate 400x2600x10 mm 1 No. 82.00 3.0 --- ---
3 ISA 75x75x8 x 2600 mm 2 Nos 46.50 0.3 10.4 73
4 Anchor rod 16 dia x 300 mm 10 Nos 5.00 0.2 0.5 4
Roller track :
5 SS track plate 80x4800x8 mm 2 Nos 48.50 0.2 ( F5 ) 19.5 136
6 ISMC 300 x 4800 mm 2 Nos 349.00 1.0 1.6 12
7 Half ISMB 250 x 4800 mm 2 Nos 180.00 5.3 19.2 135
8 Stiffener 110x120x10 mm 20 Nos 19.00 4.6 13.4 94
9 Stiffener 110x170x10 mm 20 Nos 32.00 5.6 15.4 108
10 Anchor rod 16 dia x 300 mm 40 Nos 19.00 0.6 2.0 14
Side seal track :
11 SS seal seat 60x2250x6 mm 2 Nos 13.00 0.1 ( F4 ) 9.2 46
12 ISMC 300 x 4800 mm 2 Nos 349.00 1.0 1.6 11
13 ISA 75x75x8 x 300 mm 20 Nos 53.50 3.0 18.0 126
14 Anchor rod 16 dia x 300 mm 40 Nos 19.00 0.6 2.0 14
Guide :
15 Plate 400x4800x10 mm 2 Nos 301.50 10.4 39.2 275
16 ISA 75x75x8 x 4800 mm 2 Nos 85.50 0.3 19.2 134
17 Plate 40x4800x25 mm 2 Nos 75.50 0.1 19.2 134
Top seal track :
18 SS seal seat 120x2040x6 mm 1 No. 11.50 2.1 ( F4 ) 4.3 22
19 ISMC 300 x 2000 mm 1 No. 73.00 0.5 1.2 9
20 Plate 90x300x10 mm 2 Nos 4.50 0.2 1.9 13
21 ISA 75x75x8 x 300 mm 4 Nos 6.00 0.6 3.8 27
22 Anchor rod 16 dia x 300 mm 8 Nos 4.00 0.1 0.4 3
23 Bolt/Nut/Washer 20 dia x 80 mm 4 Nos 0.50 --- --- ---
Total : 1784.00 39.9 206.5 1413
kg Rm Rm Nos
ABSTRACT :
1. Structural steel : IS : 2062
Angle / Channel / Beam / Bars : 1189.50 kg
Plates / Flats : 514.50 kg
2. Alloy steel components : IS : 1570
Stainless steel plates : 79.50 kg
3. Bolt / Nut / Washer : IS : 1363
MS Bolt / Nut / Washer : 0.50 kg

178
GATES AND HOISTS

4. Other details :
Length of cutting : 39.90 Rm
Length of welding : 206.50 Rm
Number of electrodes ( structural steel ) : 1186 Nos
Number of electrodes ( stainless steel ) : 227 Nos

28. Vertical lift roller gate for Regulator / Escape :


( With top seal arrangement )
Details of materials / Gas cutting / Welding for rate analysis :
Note : 1. Data based on embedded parts drawings for cross regulator radial gate of Alamatti LBC.
2. Unless otherwise specified 5 mm fillet weld considered for computation of requirement of
welding electrodes.
3. Plate cutting considered for 2 sides assuming other 2 sides free face.
Sl No. DESCRIPTION OF MATERIALS Weight Gas cutting Weld length Number of
in kg length in m in m electrodes
1 Skin plate 2200x2480x10 mm 1 No. 428.00 4.7 --- ---
2 End girder pl 230x2200x10 mm 4 Nos 159.00 9.8 17.6 123
3 H-girder half ISMB 450 x 2260 mm 2 Nos 163.50 2.6 10.2 72
4 Stiffener ISA 75x75x8 x 2260 mm 1 No. 20.00 0.2 5.1 36
5 Ver stiffener half ISMB450 x 340 mm 1 12.00 0.5 2.2 15
6 Ver stiffener half ISMB450 x 1340 mm 1 48.50 2.0 4.0 28
7 Stiffener 340x150x10 mm 4 Nos 16.00 2.0 5.1 36
8 Stiffener 150x1340x10 mm 4 Nos 63.00 6.9 13.1 92
9 Stiffener 150x490x10 mm 4 Nos 23.00 2.6 5.1 36
10 Stiffener 150x200x10 mm 2 Nos 5.00 0.8 1.6 11
11 Stiffener 150x250x10 mm 2 Nos 6.00 0.8 1.6 11
12 Plate 230x500x10 mm 2 Nos 18.00 1.5 3.5 24
13 Stiffener 80x230x10 mm 6 Nos 5.00 0.5 5.5 38
14 Cover plate 160x160x10 mm 8 Nos 16.00 3.8 --- ---
15 Cover plate 80x160x10 mm 4 Nos 4.00 0.6 --- ---
16 Cover plate 160 dia x 10 mm 4 Nos 6.50 2.0 --- ---
17 Seal base pl 40x2130x10 mm 2 Nos 13.50 0.1 8.7 61
18 Clamp plate 40x2175x10 mm 2 Nos 13.50 0.1 --- ---
19 Side seal 30 diax90 x 1975 mm 2 Nos --- --- ---
20 Clamp plate 70x2060x10 mm 1 No 11.50 0.1 --- ---
21 Seal support 12x2060x12 mm 1 No. 2.50 2.1 4.1 29
22 Bottom seal 76x2250x10 mm 1 No. --- --- ---
23 Top seal 30 diax90 x 1850 mm 1 No. --- --- ---
24 Clamp plate 40x2160x10 mm 1 No. 7.00 --- --- ---
25 Seal base pl 40x2250x10 mm 1 No. 7.00 --- 4.5 31
26 Plate for guide rollers 72.00 1.4 1.8 13
27 Guide roller 4 Nos 8.00
28 Wheel bush 4 Nos 5.00 --- --- ---
29 Lifting pin 90 dia x150 mm 1 No. 9.00 --- --- ---
30 Keeper plate 50x110x10 mm 1 No. 0.50 --- --- ---
31 Bolt/Nut/Washer 12 dia x 20 mm 28 Nos 2.00 --- --- ---
32 Corner seal 200x200 mm 2 Nos --- --- ---
33 Bolt/Nut/Washer 12 dia x 20 mm 16 Nos 0.50 --- --- ---
34 Bolt/Nut/Washer 12 dia x 40 mm 16 Nos 1.00 --- --- ---
35 Wheel 200/80 dia x 50 mm 4 Nos 41.50 --- --- ---
36 Wheel axle 60 dia x 176 mm 4 Nos 21.00 --- --- ---

179
GATES AND HOISTS

37 Seal bolts/nuts 12 dia x 40 mm 110 Nos 7.50 --- --- ---


Total : 1216.50 45.1 93.7 656
kg Rm Rm Nos
ABSTRACT :
1. Structural steel : IS : 2062
Angle / Channel / Beam / Bars : 244.00 kg
Plates / Flats : 877.00 kg
2. Cast steel components : IS : 1030
Wheels / Guide roller : 49.50 kg
3. Alluminium / Bronze alloy components : IS : 305
Bearings / Bushes : 5.00 kg
4. Alloy steel components : IS : 1570
Wheel axle / lifting pin : 30.00 kg
5. Rubber seals : IS : 11855
Bottom rubber seal ( uncladed ) : 2.25 Rm
Side rubber seal ( uncladed ) : 3.95 Rm
Top rubber seal ( uncladed ) 1.85 Rm
6. Bolt / Nut / Washer IS : 1363
GI Bolt / Nut / Washer : 7.50 kg
MS Bolt / Nut / Washer : 3.50 kg
7. Other details :
Length of cutting : 45.10 Rm
Length of welding : 93.70 Rm
Number of electrodes : 656 Nos

29. 3 t capacity screw hoist for vertical lift roller gate :


Details of materials / Gas cutting / Welding for rate analysis :
Note : 1. Data based on embedded parts drawings for cross regulator radial gate of Alamatti LBC.
2. Unless otherwise specified 5 mm fillet weld considered for computation of requirement of
welding electrodes.
3. Plate cutting considered for 2 sides assuming other 2 sides free face.
Sl No. DESCRIPTION OF MATERIALS Weight Gas cutting Weld length Number of
in kg length in m in m electrodes
Hoist platform :
1 ISMB 250 x 2600 mm 2 Nos 194.00 1.0 --- ---
2 ISMC 200 x 2125 mm 2 Nos 95.00 0.7 --- ---
3 Chequered plate 1000x1900x5 mm 2 Nos 172.00 3.8 --- ---
4 ISA 65x65x6 x 1990 mm 2 Nos 23.00 0.3 0.4 3
5 ISA 50x50x6 x 2600 mm 2 Nos 23.50 0.2 0.4 3
6 ISA 50x50x6 x 1255 mm 6 Nos 34.00 0.6 --- ---
7 Plate 50x2000x5 mm 2 Nos 8.00 0.1 0.2 2
8 Plate 135x250x10 mm 8 Nos 21.00 3.1 6.0 42
9 Plate 300x300x16 mm 8 Nos 90.50 4.8 --- ---
10 Plate 200x205x10 mm 6 Nos 19.00 2.4 3.0 21
11 Pipe 32 dia x 4400 mm 2 Nos 23.00 --- --- ---
12 Anchor rod 20 dia x 500 mm 16 Nos 23.00 0.3 --- ---
13 Bolt/Nut/Washer 8.00 --- --- ---
Hoist parts :
14 Hoist body 1 No. 36.00 --- --- ---
15 Hoist stem 60 dia x 3400 mm 1 No. 75.50 --- --- ---
16 Lock nut 1 No. 3.00 --- --- ---
17 Main nut 1 No. 16.00 --- --- ---
18 Thrust bearing 2 Nos 4.00 --- --- ---
19 Plate 120x150x10 mm 2 Nos 2.50 0.5 --- ---

180
GATES AND HOISTS

20 Plate 40x40x10 mm 4 Nos 0.50 0.2 --- ---


Total : 871.50 18.0 10.0 71.0
kg Rm Rm Nos
ABSTRACT :
1. Structural steel : IS : 2062
Angle / Channel / Beam / Bars : 392.50 kg
Plates / Flats : 141.50 kg
Chequered plate : 172.00 kg
2. Cast iron components : IS : 1030
Hoist body / Lock nut / Main nut : 55.00 kg
3. Alluminium / Bronze alloy components : IS : 305
Bearings / Bushes : 4.00 kg
4. Alloy steel components : IS : 1570
Hoist stem : 75.50 kg
5. Bolt / Nut / Washer : IS : 1363
MS Bolt / Nut / Washer : 8.00 kg
6. Other components :
Pipe 32 mm dia : 8.80 Rm
7. Other details :
Length of cutting : 18.00 Rm
Length of weld : 10.00 Rm
Number of electrodes : 71 Nos

30. Embedded parts for Regulator / Escape stoplog gate :


Details of materials / Gas cutting / Welding for rate analysis :
Note : 1. Data based on embedded parts drawings for cross regulator radial gate of Alamatti LBC.
2. Unless otherwise specified 5 mm fillet weld considered for computation of requirement of
welding electrodes.
3. Plate cutting considered for 2 sides assuming other 2 sides free face.
Sl No. DESCRIPTION OF MATERIALS Weight Gas cutting Weld length Number of
in kg length in m in m electrodes
Sill beam :
1 SS seal seat 60x2200x6 mm 1 No. 6.50 0.1 ( F4 ) 4.5 23
2 Plate 400x2600x10 mm 1 No. 82.00 3.0 --- ---
3 ISA 75x75x8 x 2600 mm 2 Nos 46.50 0.3 10.4 73
4 Anchor rod 16 dia x 300 mm 10 Nos 5.00 0.2 0.5 4
Roller track :
5 SS track plate 80x4800x8 mm 2 Nos 48.50 0.2 ( F5 ) 19.5 136
6 ISMC 300 x 4800 mm 2 Nos 349.00 1.0 1.6 11
7 Half ISMB 250 x 4800 mm 2 Nos 180.00 5.3 19.2 134
8 Stiffener 110x120x10 mm 20 Nos 19.00 4.6 13.4 94
9 Stiffener 110x170x10 mm 20 Nos 32.00 5.6 15.4 108
10 Anchor rod 16 dia x 300 mm 40 Nos 19.00 0.6 2.0 14
Side seal track :
11 SS seal seat 60x2250x6 mm 2 Nos 13.00 0.1 ( F4 ) 9.3 47
12 ISMC 300 x 4800 mm 2 Nos 349.00 1.0 1.6 11
13 ISA 75x75x8 x 300 mm 20 Nos 53.50 3.0 18.0 126
14 Anchor rod 16 dia x 300 mm 40 Nos 19.00 0.6 2.0 14
Guide :
15 Plate 400x4800x10 mm 2 Nos 301.50 10.4 39.2 274
16 ISA 75x75x8 x 4800 mm 2 Nos 85.50 0.3 19.2 134
17 Plate 40x4800x25 mm 2 Nos 75.50 0.1 19.2 134
Total : 1684.50 36.4 195.0 1337
kg Rm Rm Nos

181
GATES AND HOISTS

ABSTRACT :
1. Structural steel : IS : 2062
Angle / Channel / Beam / Bars : 1106.50 kg
Plates / Flats : 510.00 kg
2. Alloy steel components : IS : 1570
Stainless steel plates : 68.00 kg
3. Other details :
Length of cutting : 36.40 Rm
Length of welding : 195.00 Rm
Number of electrodes ( str steel ) : 1131 Nos
Number of electrodes ( stainless steel ) 206 Nos

31. Stoplog gate for Regulator :


( Data for one element )
Details of materials / Gas cutting / Welding for rate analysis :
Note : 1. Data based on embedded parts drawings for cross regulator radial gate of Alamatti LBC.
2. Unless otherwise specified 5 mm fillet weld considered for computation of requirement of
welding electrodes.
3. Plate cutting considered for 2 sides assuming other 2 sides free face.
Sl No. DESCRIPTION OF MATERIALS Weight Gas cutting Weld length Number of
in kg length in m in m electrodes
1 Skin plate 990x2450x10 mm 1 No. 190.00 3.4 --- ---
2 ISMB 250 x 2293 mm 2 Nos 171.00 1.0 9.6 67
3 ISMB 250 x 980 mm 2 Nos 73.00 1.0 4.4 31
4 Plate 150x250x10 mm 2 Nos 4.00 0.7 0.4 3
5 ISMB 250 x 237 mm 2 Nos 18.00 1.0 1.4 10
6 ISMB 250 x 493 mm 1 No. 18.50 0.5 1.2 8
7 Plate 150x493x10 mm 2 Nos 11.50 1.3 2.0 14
8 Plate 150x237x10 mm 4 Nos 11.50 1.6 4.3 30
9 Plate 200x237x10 mm 4 Nos 15.00 1.8 5.1 36
10 Plate 200x493x10 mm 2 Nos 15.50 1.4 3.6 25
11 Plate 100x260x10 mm 5 Nos 10.00 0.5 --- ---
12 Plate 50x1000x10 mm 2 Nos 8.00 0.1 4.0 28
13 Slide blocks 50x25x20 mm 4 Nos 1.00 0.1 0.6 4
14 Plate 50x2200x10 mm 1 Nos 8.50 --- 4.4 31
15 Plate 70x250x10 mm 2 Nos 3.00 0.2 2.3 16
16 Plate 150x300x10 mm 4 Nos 14.00 1.8 1.2 9
17 Plate 110x250x10 mm 2 Nos 4.50 0.7 1.5 10
18 Pin 50 dia x 100 mm 2 Nos 3.00 --- --- ---
19 Seal base 50x980x10 mm 2 Nos 9.50 0.1 4.0 28
20 ISA 45x45x6 x 1000 mm 2 Nos 8.00 0.1 --- ---
21 Side seal 1005 mm 2 Nos --- --- ---
22 Plate 10x1860x10 mm 1 No. 1.50 --- 3.9 28
23 Seal clamp 70x1860x10 mm 1 No. 10.00 0.1 --- ---
24 Bottom seal 76x2000 mm 1 No. --- --- ---
25 Plates for 4 Guide shoe assembly 18.00 1.3 1.8 13
26 Bolt/Nut/Washer 12 dia x 65 mm 16 Nos 1.50 --- --- ---
27 GI Bolt/Nut/Washer 12 dia x 50 mm 28 2.50 --- --- ---
28 GI Bolt/Nut/Washer 12 dia x 60 mm 30 2.50 --- --- ---
Total for 1 element : 633.50 18.7 55.7 391
Total for 4 elements : 2534.00 74.8 222.8 1564
kg Rm Rm Nos

182
GATES AND HOISTS

ABSTRACT :
1. Structural steel : IS :2062
Angle / Channel / Beam / Bars : 1154.00 kg
Plates / Flats : 1342.00 kg
2. Alloy steel components : IS : 1570
Hook pins : 12.00 kg
3. Rubber seal : IS : 11855
Bottom rubber seal ( uncladded ) : 8.00 Rm
Side rubber seal ( uncladded ) : 8.04 Rm
4. Bolt / Nut / Washer : IS :1363
GI Bolt / Nut / Washer : 20.00 kg
MS Bolt / Nut / Washer : 6.00 kg
5. Other details :
Length of cutting : 69.60 Rm
Length of welding : 215.60 Rm
Number of electrodes 4x450 mm : 1564 Nos