Вы находитесь на странице: 1из 4

PROJECT.

DOC No
TECHNICAL SPECIFICATION SHEET OF CONVEYOR
DATE
REV
Eq. Name Eq.Tag No. 1001 CV 1001 A Location
Wet Cake from decanter to conveyor B

Quantity 01 Nos Duty Continuous Service

Mfr. Name ** Model No. ** Curve No.

Mfr. Std Performence ** Electricals


** Std

OPERATING PARAMETERS

A APPLICATION Wet Cake Conveying to Conveyor B


B PROPERTIES
1 Material Wet Cake from Decanter

2 Bulk Density 1200 kg/mᵌ

3 Flow -ability Average

4 Solids 25% to 30% w/w

5 Discharge Capacity 7500 kg/hr

6 Operating Temp. 85⁰C

B PARAMETERS UNITS DISCRIPTION

1 Type of conveyor Horizontal Screw Conveyor

2 Size of conveyor mm ***

3 Length of Conveyor mm 5500

4 Inlet.Nozzle size mm 400

5 Outlet.Nozzle size mm 400

6 Non Flameproof Gear Motor KW/RPM mm ***/ 20

7 Screw shaft Pipe- DIA mm ***

8 Trough thk & MOC mm 5 min X SS304

9 End Plate Thkness mm 12 X SS304

10 End sealing for shaft - Stuffing Box With Teflon Gland Packing

Hager Bearing Hanger bearing or busher mounder on olid shaft to be provided at the Interval
11 - of 5.0 m of each conveyor

12 Area of classification - Flameproof

13 Bearing Make /No - *** SKF/Fag

14 Power Supply - 415 V , 3 Phase , 50 Hz


15 Zero Speed Switch - To be provided

16 Finishing & Painting Mat finish 160 Grt,


All MS part should be 2 coats of red oxide primer, finish paint-2 synthetic
- enamel pant shade

C PERFORMANCE

1 Capacity kg/hr 7500 REMARKS :

2 Temp ⁰C 85⁰C

3 Efficiency % ***

4 Rated Speed RPM **

5 Duty Point Power KW **

6 Recommended Motor KW/RPM **


NOTES :
¾ For design capacity, 30% filling should be considered.
¾ For power calculation, 100% filling is to be considered.
¾ Bottom cleaning nozzle should be provided with quick cleaning clamp.
¾ All SS304 Parts are Matt Finish internally & externally
¾ Screw conveyor will operate in Clockwise direction.
¾ Inlet Outlet openings to be adequately capped or plugged.
¾ Supplier to quote the necessary items required for proper functioning of the screw conveyor.
¾ Any deviation to be separately highlighted.
¾ Supplier have to suggest support needed for screw conveyor
6/15/2018
0
Indoor

**

415V,50Hz,3Phase

d Packing

under on olid shaft to be provided at the Interval


of red oxide primer, finish paint-2 synthetic