11-Jun-2020
2.1 Together with LTA R8201 project team, you must obtain all the necessary
concurrences and clearances from the relevant LTA divisions (Rail Asset,
Operations and Maintenance (RAOM), Civil & Structures (CST) as well as the
train operator, SBS Transit, before you are allowed to commence the proposed
works.
2.2 We noted that the MEWP will not be extended beyond the edge of the LRT
viaduct. Please address the following comments:
c) Please note that the PE assignee must possess a valid RE certificate. Please
attach the valid RE certificates of Too Tat Wei and Fazrul Amanur Rahman
and the completed revised forms “Undertaking to Supervise Machinery
Operation within Railway Protection and Safety Zones” if Er. Robin Chia
wishes to appoint them as PE assignees.
d) You must also provide abutting 25mm thick steel plates above the proposed
300mm thick compacted hardcore for a better distribution of loads.
2
e) The LE certificate attached in the submission had expired, please retest and
resubmit the valid LE certificate for our record.
2.3 We noted that 4 LRT piers (PW23-2, PW23-4, PW23-5 & PW23-6) mentioned
in the submission are within the C715 tunnelling influence zone. Together with
LTA R8201 project team, please address the following comments from LTA
C715 (Tunnelling) Project Team:
c) You must ensure the existing instruments installed by C715 project team
are protected and will not be affected by the proposed works at all times.
d) Please assess what is the impact of the proposed works on the existing
C715 South Bound built tunnel, existing instrumentation and their readings.
2.4 Together with LTA R8201 project team, please coordinate with Rail Design
Development, Ms Stefanie Christanti (Stefanie_CHRISTANTI@lta.gov.sg),
separately for the proposed works.
2.5 The proposed sites are in close proximity to JTC’s Punggol Digital District
development, please liaise with JTC separately for the proposed works.
2.6 You must ensure that there will be no storage of combustible materials including
petrol or diesel-powered equipment and generators, combustible hoarding and
timber etc. within the RTS first reserve at all times.
4. You may contact Ms Lin Jing at 6332 8387 if you need any clarification.