AAB SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
WAB
CIB
COMPANY’s inspectors.
NSA
The skid shall be inspected by the Purchaser or Purchaser’s designated agent for
workmanship and functionality. Any reliability or maintainability problems identified
shall be corrected before shipment.
DESCRIPTION
Vendor shall maintain documentation of all inspections for the duration of the longest
ISSUED FOR CONSTRUCTION
Surfaces of pressure containing parts shall not be coated until the specified
inspection of that part and hydrostatically testing (if specified) is completed.
Vendor shall submit his proposed test procedures and plan for approval to the
COMPANY prior to any testing. Vendor shall provide all necessary equipment,
materials, labor, water, etc. and all consumables to perform the required tests.
19000-9284
JO/EWO
CER 11-
Positive Material Identification (PMI) shall be performed on all the materials and
07/16/19
00
Inspection and testing shall meet the requirements of applicable inspection forms
DISCIPLINE
ENGINEER
(Form-175), standards and specifications referenced in this specification.
NSA
07/16/19
04/14/13
DATE: Free access shall be provided to all manufacturing plants for the COMPANY
PROJECT
ENGINEER Inspectors, including SUB-SUPPLIER facilities. Final inspection of all equipment
HMA shall take place at the SUPPLIER or SUB-SUPPLIER facilities prior to shipment.
04/14/13
07/16/19
DATE:
CERTIFIED Inspection and Testing Requirement Forms: Refer to section 3.5 of this document
CIB
04/14/13
for relevant inspection and testing forms and requirements.
07/16/19
DATE:
CONSTRUCTION
AGENCY Workshop pressure testing of pressure containing equipment.
WAB
07/16/19
DATE: Vendor to supply first charge of lubrication oils and grease.
OPERATIONS
ABB
Inspection Level for Corrosion Inhibitor skid is 3. Refer SAEP-1151 for Inspection
07/16/19 Level of individual components.
DATE:
CONTROL NUMBER
VERIFICATION
17.2 Testing
EDSD
The assembled piping system of package shall be hydrostatically tested with liquid at
DATE:
BY:
test.
00
11-19000-9284-001
(DCC) NO. _____________________
TECHNICAL SPECIFICATIONS FOR CORROSION INHIBITOR INJECTION DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION