Saudi Aramco 2616-ENG (03/99)

PMT OPRNS
AAB SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
WAB

Random inspection, Fabrication, assembly monitoring, spot check of raw material


before fabrication, painting check shall be performed on random basis by
ENGG CERT

CIB

COMPANY’s inspectors.
NSA

In case radiography check is requested by the inspection requirements forms, X-ray


film review shall be performed and location map shall be provided.

The skid shall be inspected by the Purchaser or Purchaser’s designated agent for
workmanship and functionality. Any reliability or maintainability problems identified
shall be corrected before shipment.
DESCRIPTION

Vendor shall maintain documentation of all inspections for the duration of the longest
ISSUED FOR CONSTRUCTION

warranty period for any component on the skid.

Surfaces of pressure containing parts shall not be coated until the specified
inspection of that part and hydrostatically testing (if specified) is completed.

Vendor shall submit his proposed test procedures and plan for approval to the
COMPANY prior to any testing. Vendor shall provide all necessary equipment,
materials, labor, water, etc. and all consumables to perform the required tests.
19000-9284
JO/EWO
CER 11-

Positive Material Identification (PMI) shall be performed on all the materials and
07/16/19

welds (shop and field) as required by SAES-A-206. VENDOR shall provide


DATE

necessary documentation for PMI testing.


NO.
REV

00

Inspection and testing shall meet the requirements of applicable inspection forms
DISCIPLINE
ENGINEER
(Form-175), standards and specifications referenced in this specification.
NSA
07/16/19
04/14/13
DATE: Free access shall be provided to all manufacturing plants for the COMPANY
PROJECT
ENGINEER Inspectors, including SUB-SUPPLIER facilities. Final inspection of all equipment
HMA shall take place at the SUPPLIER or SUB-SUPPLIER facilities prior to shipment.
04/14/13
07/16/19
DATE:
CERTIFIED Inspection and Testing Requirement Forms: Refer to section 3.5 of this document
CIB
04/14/13
for relevant inspection and testing forms and requirements.
07/16/19
DATE:
CONSTRUCTION
AGENCY Workshop pressure testing of pressure containing equipment.
WAB

07/16/19
DATE: Vendor to supply first charge of lubrication oils and grease.
OPERATIONS
ABB
Inspection Level for Corrosion Inhibitor skid is 3. Refer SAEP-1151 for Inspection
07/16/19 Level of individual components.
DATE:
CONTROL NUMBER
VERIFICATION

17.2 Testing
EDSD

The assembled piping system of package shall be hydrostatically tested with liquid at
DATE:
BY:

a minimum of 1-1/2 times the design pressure. Instrumentation that may be


REVISIONCERTIFICATION

damaged by a hydrostatic test shall be removed or adequately isolated before the


APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


A

test.
00

11-19000-9284-001
(DCC) NO. _____________________

If the component tested is to operate at a temperature at which the strength of a

TECHNICAL SPECIFICATIONS FOR CORROSION INHIBITOR INJECTION DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

SKID TIE-IN HRML-824 WS WELL TO HRML PWI DOC


434 TE- 126923 27
GOSP A OF 00
HARMALIYAH SAUDI ARABIA JO / EWO:
11-19000-9284 31
EDSD/2616-0399.doc