COMPLEX
Submitted by
of
BACHELOR OF ENGINEERING
in
CIVIL ENGINEERING
DECEMBER 2020
Hindusthan College of Engineering and Technology
Approved by AICTE, New Delhi, Accredited with ‘A’ Grade by NAAC
(An Autonomous Institution, Affiliated to Anna University, Chennai)
per the regulations of this Institute and meets the necessary standards for
submission.
Place: Coimbatore
Date:
Implant Training In-charge Head of the Department
Register Number: _________________________
Submitted for the Implant Training Viva Voce Examination conducted on
………..................
We thank the almighty God for giving us the strength and determination to
motivate ourselves to complete implant training.
We manifest our deep sense gratitude and heartfelt thanks to our Implant
training Coordinator, Mr. R. PARTHASARATHI, M.E., Assistant Professor of
Civil Engineering for his valuable guidance, comments and suggestions during
the implant training.
INSTITUTION LETTER
INDUSTRY ACCEPTANCE LETTER (Optional)
This project presents an experimental study where angle steel was used as
reinforcement in structure concrete members like Slab element. In this
project tests were done to compare the structural response of members made
with angle steel and conventional round bar as reinforcement. Angle
sectioned slab element is having smaller cross -sectional area and equality
yield strength. Then that of usual steel reinforcement bar and angle steel
section was used to prepare the structural specimens in this project. It was
found that the load carrying capacity of angle steel reinforced concrete slab
element were found cyclic loading test in the loading frame with the ultimate
load of 66.7 KN and 5.7 mm of deflection. And Normal steel reinforced
concrete slab that load carrying capacity of 77.7 KN and the deflection of
4.4 mm. In this thesis report which include of the combinations of load
carrying capacity and deflections of the angle steel reinforced concrete slab
and normal conventional reinforced concrete slab.
CHAPTER PAGE
NO. NO.
TABLE OF CONTENTS
ACKNOWLEDGEMENT i
INSTITUTION LETTER ii
ABSTRACT v
LIST OF TABLES vi
INTRODUCTION
1.
1.1 Profile of the Industry
1.2 About the ongoing Project
2. TRAINING DETAILS
2.1 Day to Day Activities
INTRODUCTION
TRAINING DETAILS
There are 14 columns ready for concrete filling, three mason came and they
started fitting the boxes (7boxes). Then they placing the boxes in the correctly using
the plumbob and they keep supports to hold them. They started mixing concrete with
m-sand and they pour into the boxes.
The concrete grade used here is M25 and the proportion is 1:1:2.
The next day they started doing the same for the other 7 columns and this took
a day to complete and the next two days were for removing the boxes and curing
process with the jute bags.
BELT CONCRETE WORK
The mason then started to build the belt concrete, the field was slightly ups
and downs so they use the reference for the belt concrete was obtained from the
opposite veterinary hospital and they laid the concrete. They started to construct the
layer above the belt concrete.
Then they started to connect the pillars by using the black stone (karung kal).
Due to insufficient stones and workers this took up two days to complete.
REINFORCEMENT WORK
The bar bending workers came that day and they started to build the beam
above the level that they already completed. They keep the rods and they tie using
the binding wire this done in one day.
The rod using here is 16mm rod and the stirrups spacing is 7inches.
Fig 2.4 Reinforcement ready for concrete
Then the next day the centering workers came and they started the work by
fixing the plates beside the both sides of the reinforcement for the beam.
Then they started the day with mixing of concrete and pouring of concrete in
the reinforced places and it took one day with less workers. Then the next day only
removing the plates and curing process was done. And the next day the plates are
totally removed and soil is filled in that place.
Then they started the day with building the walls on the sides above that. The
workers constructed by English bond method.
It gave me lots of benefit and positive changes that enable me to enter the
working environment. Through this training I was able to gain new insights and more
comprehensive understanding about the real industry working condition and
practice.
In this training I studied about planning and execution. All of this valuable
experience knowledge that I have gained were not only acquired through the direct
involvement in task given but also through other aspect of the training such as
work observation, interaction with the staffs and local people
.