Вы находитесь на странице: 1из 1

960

0H
EAD
SPR
OC
KET
TO
TAI 1200
LS
PRO
CK
ET
CRS
.
3800

1800
STATUS DATE AUTH.

600
9600
00 22.03.18 MATERIAL HANDLING HS PS HP SK

REV DATE DESCRIPTION BY CK'D ENG. APP'D


THIS DRAWING IS PROPERTY OF GENESYS PROJECTS & ASSOCIATES
DO NOT SCALE
PVT. LTD. AND MUST NOT BE USED/COPIED WITHOUT THEIR
IF IN DOUBT PLS ASK CONSENT OR AUTHORISATION

GPA GENESYS PROJECTS & ASSOCIATES PVT. LTD.


110-A, First Floor, Jaina Tower-1,
DRIVE UNIT

MOTOR PROVIDED GENESYS PROJECTS &


ASSOCIATES PVT. LTD.
Janakpuri, District Center, New Delhi
DRIVE DETAILS

GEAR BOX PROVIDED


PROJECT TITLE
SPEED SPEED

EQUIPMENT NO. AF-1


HIGH

TYPE/MAKE PINBUSH TYPE


COUPLING
APRON FEEDER

CAPACITY DESIGN/ RATED 5 TPH SIZE -- SLAG HANDLING SYSTEM


SHAFT C/C 9600 MM
LOW

TYPE/MAKE GEARED TYPE


TYPE PAN TYPE APRON FEEDER --
CLIENT
SIZE Sidcul, Tanda Range,
SPEED (M/SEC.) 0.25 M/SEC
UP TYPE / TRAVEL SCREW TAKE-UP
M/s. HINDUSTAN ZINC Pantnagar, Uttarakhand
MATERIAL

KE LIMITED
HANDLED

MATERIAL SLAG A LOCATION


T TAIL END
BULK DENSITY (KG/CU,M) 2500
FABRICATED DRAWING TITLE
PAN

LUMP SIZE (inch) 4 - 6 inch PAN SIZE


PROVIDED
CHAIN TYPE Carrier Type PROPOSED G.A. DRAWING OF
PROVIDED SLAG HANDLING SYSTEM
HEAD SPROCKET RE HEAD FRAME PROVIDED
TU PROVIDED
MAKE:DIAMOND

SPROCKET MATERIAL OF CONSTRUCTION. C TAIL FRAME


C-45 (TOOTH HARDNESS 45-50 RC) U
TR CLIENT DWG. NO. -
SPROCKET

SHAFT MATERIAL OF CONSTRUCTION. C-45, SHAFT DIA AT BRG. 110 MM S SUPPORT PROVIDED

TAIL SPROCKET & SHAFT PROVIDED SKIRT BOARD 9 m long


SCALE SIZE PROJECT NO. SUB DWG. NO. REV.
SPROCKET MATERIAL OF CONSTRUCTION.
C-45 (TOOTH HARDNESS 45-50 RC) SAFETY ZERO SPEED SWITCH/LOCATION/MAKE AT TAIL SPROCKET
SHAFT MATERIAL OF CONSTRUCTION. SWITCH 1:1 A3 MKT-711 - 00
C-45, SHAFT DIA AT BRG. 110 MM GA/GPA/MKT/711

Вам также может понравиться