ASSIGNMENT OF INDUSTRIAL ENGINEERING

TOPIC- USES OF GSD CODES

SUBMITTED TO: SUBMITTED BY:


MR MOHAMMAD UMAR JYOTI RAWAL
ASST. PROFESSOR TECH 4stSEMESTER
ACKNOWLEDGEMENT
In preparation of my assignment, I had to take the help and guidance of some respected persons, who
deserve my deepest gratitude. As the completion of this assignment gave me much pleasure, I would like
to show my gratitude Mr. Mohammad Umer, IE Faculty, of Nift Kangra, for giving me good guideline for
assignment throughout numerous consultations. I would also like to expand my gratitude to all those who
have directly and indirectly guided me in making this assignment.

I also thank Nift Kangra for giving me such an opportunity to explore more with constant learning.
Many people, especially my classmates have made valuable comment suggestions on my assignment
which gave me an inspiration to improve the quality of the assignment

I have taken efforts in this project. However, it would not have been possible without the kind support and
help of many individuals and institution. I would like to extend my sincere thanks to all of them.

I am highly indebted to for their guidance and constant supervision as well as for providing necessary
information regarding the assignment & also for their support in completing the project.
Example 1:
Determining SMV using GSD codes.

Operation: Top stitch at the front pocket bag using GSD

ELEMENT DESCRIPTION GSD CODES CODES TMU RPM SPC


Reach and grasp the pocket GP2H Get part with 2 hands 33
Align and put under presser foot FOOT Match part under presser 38
foot
Align the panels AM2P Align and match - 2 part 61
Initial back tack Z6 Auto back tack 6
Take first bust MS1A Machine sew - 1cm approx 17
Sew 5cm along a visible seam, stop at S5MA Sew the panel 28.165 5000 5
run off at the end
Align the panels AM2P Align and match - 2 part 61
Take the second burst MS1C Machine sew - 1cm precise 37
Sew 6cm along a curved visible seam, S6MC Sew the panel 50.398 5000 5
stop at a precise
point or to change direction
Align the panels AM2P Align and match - 2 part 61
Take the third burst MS1A Machine sew - 1cm approx 17
Sew 4cm along a curved visible seam, S4MA Sew the panel 25.927 5000 5
run off at the end
Align the panels AMP2 Align and match - 2 part 61
Take the forth burst MS1C Machine sew - 1cm precise 37
Sew 3cm along a visible seam, stop at S3MC Sew the panel 43.699 5000 5
a precise
point or to change direction
Realign the panel AM2P Align and match - 2 part 61
Stitch till the end MS1C Machine sew - 1cm precise 37
Sew 11cm along a straight visible S11MC Sew the panel 61.563 5000 5
seam, stop to form visible back tack
Back tack Z6 Auto back tack 6
Cut the thread with UBT TBLD Trimming using fixed blade 33
Dispose off PPST Put part for staking 14
Total TMU 789.75
Time in minutes = 789.75/1666.2 = 0.473minutes

Standard time= Basic time + Allowance time

Allowance= 20

SMV= 0.473+ (0.2*0.473) = 0.5676 MINUTES


Example 2:
Determine standard operation and establish more economical operating method.

Time study of stitching of backrise of trouser

ELEMENT DESCRIPTION WR R BT ALLOWANCE ST


Align the panels and place them 0.16 min 65% 0.1 min 10% 0.11 min
under the pressure foot
Align the panels and make the first 0.13 min 50% 0.06 min 20% 0.07 min
burst
Align the panels and make the second 0.08 min 75% 0.06 min 20% 0.072 min
burst
Align the panels and make the third 0.13 min 65% 0.08 min 20% 0.096 min
burst
Align the panels and make the fourth 0.16 min 65% 0.1 min 22% 0.122 min
burst
Back tack and cut the thread 0.067 min 75% 0.05 min 20% 0.06 min
Turn inside out and discard 0.067 min 65% 0.04 min 10% 0.044 min

The above table shows the standard time of the same operations done through the garment sewing data.

The element descriptions here are in brief as compared to GSD. This helps administrators discover
redundant and wasted motion in operation. Meanwhile, in the study on tiny motions, it is feasible to
establish more economical operating method and improve operating standard with methods such as tool
improvement for difficult operations in time. So we can conclude that GSD determine standard operation
and establish more economical operating method.