Model F350 Sectional Test & Drain


5.6K (80K) Test Orifice for Use with
Field-fabricated Sectional Control Arrangements
General Figure 1 illustrates a typical sectional
control arrangement that is utilized for
Description the flow control, inspection, testing,
and draining of feed mains to sec-
The TYCO Model F350 Sectional Test tions of wet pipe automatic sprinkler
& Drain (Ref. Figure 2), with an inte- systems. A typical application is in a
gral Sight Glass Assembly, provides a multi-story building where waterflow
simplified means for testing of water- alarm devices are required on each
flow alarm devices and draining of floor at each riser.
feed mains. It is typically utilized for The Model F350 Sectional Test & Drain
connection to a common inside drain is a redesignation for the Gem Model
where it is not practical to terminate an F350.
inspector’s test connection outside of
a building. NOTICE
The F350 has a smooth bore corrosion- The Model F350 Sectional Test & Drain
resistant test orifice equivalent to that described herein must be installed and
of a 5.6K (80K) orifice sprinkler, and it maintained in compliance with this
is provided with 1-1/4 inch NPT pipe
size connections that make it suitable
document, as well as with the applica-
ble standards of the NATIONAL FIRE
Technical
for use as a sectional drain connection
with up to a 3-1/2 inch (DN80) size feed
PROTECTION ASSOCIATION (NFPA),
in addition to the standards of any other
Data
main. Additional features of the F350 authorities having jurisdiction. Failure Approvals
include: to do so may impair the performance UL Listed
of these devices. FM Approved
• pre-assembled indicating type valve
arrangement The owner is responsible for main- Maximum Service Pressure
taining their fire protection system 175 psi (12,1 bar)
• installation in any position
and devices in proper operating con- Shut-Off Valve
• dual-handle control to provide dition. Contact the installing contrac- Quarter-turn ball valve, stainless steel,
positive-stop positioning for test, tor or product manufacturer with any corrosion-resistant copper alloys with
drain and shut-off questions. glass-filled PTFE seals
• a unique, self-cleaning sight glass Dual-Orifice Valve
assembly that provides a positive Quarter-turn ball valve, bronze, chrome
indication of flow, even in dimly lit plated, corrosion-resistant with a 5.6K
areas without a flashlight (80K) smooth bore test orifice
• visual flow indicator for both alarm Sight Glass Assembly
test (partial flow) and flow test (full Cast iron body, red painted, dual glass
flow conditions) vibrates to provide lenses mounted in NPT-threaded, plated
a positive indication of flow even in steel inserts
dimly lit areas Thread Connections
Thread connections are assembled with
a TEFLON sealant and each assembly is
factory tested to 350 psi (24,1 bar)

IMPORTANT
Refer to Technical Data Sheet
TFP2300 for warnings pertaining to
regulatory and health information.

Page 1 of 4 AUGUST 2018 TFP1650


TFP1650
Page 2 of 4

Installation SECTIONAL
CONTROL
WATERFLOW
DETECTOR
The TYCO Model F350 Sectional Test & VALVE
Drain must be installed in accordance
with this section.
PRESSURE GAUGE
Notes: (RECOMMENDED)
• The Model F350 Sectional Test &
Drain must be installed in a readily GAUGE TEST VALVE
visible and accessible location, pref- (RECOMMENDED)
erably not over seven feet above the
floor.
SYSTEM
• Wet pipe fire protection systems
must be maintained at a minimum
temperature of 40°F (40°C). WATERFLOW
• The outlet of the F350 must be con- DETECTOR
nected to a drain sized to accept full HEADER
flow during a sectional flow test.
The Model F350 Sectional Test & Drain DRAIN FLOW
is to be installed in accordance with the
following criteria:
MODEL F350
Step 1. Apply pipe thread sealant spar- SECTIONAL TEST
ingly to male pipe threads only. Use of a RISER DRAIN AND DRAIN
TEFLON sealant is recommended. FIGURE 1
Step 2. The F350 may be installed in TYPICAL SECTIONAL CONTROL ARRANGEMENT
any orientation; however, the arrow
on the assembly must point in the
direction of flow (towards drain) and 4-7/8" 1-1/4"
there must be no restriction to the full (124 mm) (32 mm)
1-1/4" NPT
movement of the valve handles (Ref. INLET ON 2-1/2"
Figure 2).
(64 mm)
Step 3. To prevent distortion of the OFF
valve bodies, tighten the inlet pipe con- 3"
nection by wrenching on the Shut-Off (76 mm)
Valve inlet only and tighten the outlet
pipe connection by wrenching on the
Sight Glass Assembly fitting outlet only.
SHUT-OFF
Note: Do not use the F350 to force a
FLOW

VALVE
pipe line into position. Doing so may
result in distortion of the valves. DUAL-ORIFICE 11-1/4"
VALVE (286 mm)
LABEL
TEST
SIGHT
LENS GLASS
ASSEMBLY FLOW
INDICATOR
LENS

DRAIN
TURNING
4-5/8" 1-1/4" NPT RADIUS
(117 mm) OUTLET 2-3/4"
(70 mm)
FIGURE 2
MODEL F350 SECTIONAL TEST & DRAIN
TFP1650
Page 3 of 4

Care and Sectional Alarm Test


Step 1. Position the Dual-Orifice Valve Limited
Maintenance handle in the “TEST” position.
Step 2. Position the Shut-Off Valve
Warranty
The Model F350 Sectional Test & Drain handle in the “ON” position. Water For warranty terms and conditions, visit
must be maintained and service in is then permitted to flow through the www.tyco-fire.com.
accordance with this section. test orifice to simulate the flow from an
Before closing a fire protection system
individual 5.6K (80K) orifice sprinkler
located downstream of the waterflow Ordering
control valve for inspection or main-
tenance work on the fire protection
detector (Ref. Figure 1).
Step 3. Observe the Flow Indicator
Procedure
system that it controls, permission to
shut down the affected fire protection located within the Sight Glass Assem- Contact your local distributor for avail-
systems must be obtained from the bly and check for vibratory movement ability. When placing an order, indi-
proper authorities and all personnel that indicates water flow. cate the full product name, including
who may be affected by this decision description and part number (P/N).
Step 4. After verifying proper opera-
must be notified. tion of the waterflow detector, return Sectional Test & Drain
After placing a fire protection system the Shut-Off Valve handle to the “OFF” Specify: 1-1/4 inch NPT Model F350
in service, notify the proper authorities position. Sectional Test & Drain with 5.6K (80K)
and advise those responsible for moni- Test Orifice, P/N 54-350-1-001
Sectional Flow Test
toring proprietary and/or central station
Step 1. Position the Dual-Orifice Valve
alarms.
handle in the “DRAIN” position.
Before testing alarms, notification
Step 2. Make note of the static water
must be given to the owner and the fire
pressure at the inlet to the F350 Sec-
department, central station or other
tional Test & Drain.
signal station to which the alarms are
connected. Step 3. Position the Shut-Off Valve
handle in the “ON” position. Water
The owner is responsible for the
from the system will then be permitted
inspection, testing, and maintenance of
to flow through the drain orifice.
their fire protection system and devices
in compliance with this document, as Step 4. Observe the Flow Indicator
well as with the applicable standards located within the Sight Glass Assem-
of the NATIONAL FIRE PROTECTION bly and check for vibratory movement
ASSOCIATION (e.g., NFPA 25), in addi- that indicates water flow.
tion to the standards of any authority Step 5. Make note of the residual
having jurisdiction. Contact the install- (flowing) water pressure at the inlet to
ing contractor or product manufacturer the F350 Sectional Test & Drain.
with any questions.
If the static or residual pressure read-
It is recommended that automatic ings vary significantly from those pre-
sprinkler systems be inspected, tested, viously recorded or expected, then the
and maintained by a qualified Inspec- reasons for the variations should be
tion Service in accordance with local investigated and resolved.
requirements and/or national codes.
Step 6. After the sectional flow test is
The F350 Sectional Test & Drain does completed, slowly return the Shut-Off
not require any regularly scheduled Valve handle to the “OFF” position.
maintenance. However, the follow-
ing procedures, as applicable and in Sectional Drain
addition to any specific requirements Step 1. Close the Sectional Control
of the NFPA, may be used to perform Valve.
an alarm test of a sectional waterflow Step 2. Position the Dual-Orifice Valve
detector, to perform a sectional flow handle in the “DRAIN” position.
test, or to drain a section of the sprin-
kler system (after closing the sectional Step 3. Position the Shut-Off Valve
control valve). Any impairments must handle in the “ON” position. Water
be immediately corrected. from the system will then be permitted
to drain through the drain orifice.
Note: No attempt is to be made to
repair an impaired F350 Sectional Test
& Drain. The complete assembly must
be replaced if there is any indication of
malfunction. With the exception of the
Sight Glass Assembly, no attempt is to
be made to disassemble and clean the
F350 Sectional Test & Drain.
TFP1650
Page 4 of 4

1400 Pennbrook Parkway, Lansdale, PA 19446 | Telephone +1-215-362-0700


© 2018 Johnson Controls. All rights reserved. All specifications and other information shown were current as of document revision date and are subject to change without notice.