UNIVERSITI TEKNOLOGI MARA, PERLIS

PRACTICAL HANDOUT

COURSE GLS210– CADASTRAL SURVEYING II


TITLE Re-survey and Displacement of Boundary Marks
DURATION 14 Weeks
TASKS  To carry out re-survey of the specified land parcel and perform
boundary marks refixation exercise.

OBJECTIVES  To further impart knowledge in cadastral surveying procedures


as practiced in the Department of Survey and Mapping Malaysia
(DSMM) with an emphasis in e-cadastral implementation.

EXPECTED  Students should be able to understand the concept of old DCDB


(PUDK) and NDCDB in the e-cadastral implementation.
OUTCOMES
 Students should be able to organize field survey team during
fieldwork
 Able to perform Refixation of boundary mark according to
JUPEM procedures (PKUP 2002 & PKUP 2010).

INSTRUMENTS GNSS receivers, Total station, tripods, prisms, prismatic compass, mini
prism, etc.

INSTRUCTIONS 1. Instrument Calibration


 Differential field test shall be carried out at the start of every
new job
 Daily test shall be conducted before new measurement is made
on each day

2. Datum and Azimuth Control


 Shall be based on a proper datum as specified in the DSMM
regulation 2009
 Establish Two (2) CRM points by GNSS methods ( the Last task-
pick 3 CRM)

3. Data Collection as specified in the DSMM 2009 regulations


 Field data collection can be done by Traverse, Radiation,
Intersection, Resection, and GNSS.
 GNSS receiver or total station or combination of them can be
used in this task.
 If GNSS receiver is to be used, student can select appropriate
observation techniques which include static, rapid static, RTK or
network RTK (MyRTKNet).
 If EDM/Total station is to be used, the requirement of
differential field test (OFT) and daily test (DT) shall be observed.
Bearings and distances shall be observed in both faces of the
instrument.

Faculty of Architecture, Planning & Surveying / Department of Surveying Science & Geomatics Year : 2017
Diploma in Geomatic Science – AP120/121/122
© Copyright Universiti Teknologi MARA, Perlis
 Connection at least to Three (3) NDCDB points (must prove in
good condition)
 All missing and out-of-position boundary marks are to be
replaced and re-fixed respectively.

4. Data Processing
 Two methods will apply which is a conventional method (PKUP
2002) and e-cadaster (PKUP2009).
 For conventional method, calculation of final bearing and
distance (Field Book), calculation of datum, calculation of base
line, third marks, and interior angle, determination of fixed BKL
or known point and comparison between boundaries for
determine the boundary displacement, determination of bearing
factor and distance factor, adjusted lot, and offset for purposes
of refixation. Calculation volume (JK), area or lot comparison.
 In the e-cadaster method, generation of 16 Survey ASCII Files
using selected e-cadaster software (optional and if possible).
 Adjustment using Least Square Adjustment (LSA)
 A least square adjustment method should be used to determine
whether the survey data are within the acceptable range of limit
(upper-bound or lower-bound).
 Upper-bound data shall be rejected and require field
rectification/ correction.
 Lower-bound data will be accepted for further quality checking
(e-QC).

5. Quality Checking ( e-QC)


• To verify and check the surveyed 16 ASCII files.
• Perform technical checking and boundary encroachment.
• Perform checking of out-of-position boundary mark

6. Certified Plan (CP)


 Perform certified plan drawing using AutoCAD facility
 Plan shall be drawn according to DSMM’s specification

OUTPUTS  Survey report is to be prepared by group


 Field book.
 Solar observation form.
 16 ASCII Files.
 Chi-square report.
 Adjusted coordinates report.
 Adjusted distance and distance residual report.
 Adjusted bearings and bearings residual report.
 Standard deviation and error ellipse report.
 Station comparison -report.
 Report shall be prepared according to the given format (see
appendix)
 Report shall be submitted before the end of week 14 (before study
week) for assessment

ASSESSMENTS  Field Assessments ( commitment, leadership, attendances)


(30 marks)  Individual Report (hand writing).

Faculty of Architecture, Planning & Surveying / Department of Surveying Science & Geomatics Year : 2017
Diploma in Geomatic Science – AP120/121/122
© Copyright Universiti Teknologi MARA, Perlis
Appendix-FORMAT OF REPORT

FOREWORD
TABLE OF CONTENT

1. INTRODUCTION
Provide a brief introduction about your group and the practical tasks.

2. OBJECTIVE
Specify the objective of this practical task.

3. METHODOLOGY
Clearly outline the methodology of the practical task. Please specify your reference or
source of information.

4. DATA COLLECTION
You will be required to collect several types of data in different stages to complete your
task. Specify what types of data you are collecting and how do you process it. All work
sheets shall be attached in the appropriate Appendix.

5. DATA PROCESSING
Explain all the data processing that applied during field works.

6. OUTPUT
Specify the final outputs of your practical task. Explain the procedures which have been
undertaken to produce the said output.

7. ANALYSIS
Analysis all the output starting at field work e.g. site reconnaissance, datum, etc until
producing final output.

8. COMMENTS
8.1. List down ten (10) new things that you have learned in this practical task.
8.2. Briefly, discuss on the achievement of the project objectives. Provide reasons on
why the main objective could not be achieved.
8.3. Does your group manage to fulfill all requirements and specifications which have
been specified in the Peraturan Ukur Kadaster 2002 and Peraturan Ukur Kadaster
2009 including bearing closure, linear misclosure, solar observation etc. If there is
any requirement which could not be achieved, specify the reasons and possible
source of errors.
8.4. Discuss any problems which have been facing in the execution of this project
including shortage of instrument, quality of instrument etc. and how do you
overcome them.
8.5. Give general comment on the commitment of your group member.
8.6. Include suggestions, if any, to improve the quality of the practical task in the future.

REFERENCES

Please provide a systematic list of reference materials which have been cited or quoted in
the report.

Faculty of Architecture, Planning & Surveying / Department of Surveying Science & Geomatics Year : 2017
Diploma in Geomatic Science – AP120/121/122
© Copyright Universiti Teknologi MARA, Perlis
ATTACHMENTS

All materials and records including field book, EDM Calibration sheet, calculation sheet, solar
observation forms, calculation volume and certified plan should be properly labeled and
attached. These materials should not be included in the report section. Materials should be
labeled as Appendix 1, Appendix 2 etc.

Flow of works

Faculty of Architecture, Planning & Surveying / Department of Surveying Science & Geomatics Year : 2017
Diploma in Geomatic Science – AP120/121/122
© Copyright Universiti Teknologi MARA, Perlis

Вам также может понравиться